ITEM 4. 10
CITY MANAGER' S REPORT
JUNE 9, 2025 CITY COUNCIL REGULAR MEETING
ITEM: APPROVE PROFESSIONAL SERVICE AGREEMENT
WITH WESTWOOD PROFESSIONAL SERVICES, INC.
FOR THE DESIGN OF THE SIDEWALK AND
LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP
PS 25- 14
RECOMMENDATION: Adopt a Resolution to Approve a Professional Service Agreement with Westwood Professional Services,
Inc. for the design of the Sidewalk and Landscape
Improvements, Phase I Project, CIP PS 25- 14
SUMMARY:
The Stonebridge community was established in August 2000, designed with winding sidewalks, mature shade trees, and attractive landscaping to encourage walking and enjoyment of the scenic surroundings. Over time, however, the tree roots have become invasive, lifting and damaging sidewalks throughout the neighborhood and creating numerous tripping hazards. In response, City staff has removed several trees, resulting in a noticeable loss of shade along many walking paths. Additionally, in efforts to maintain safety, portions of the sidewalks have been shaved down or removed entirely, leading to aesthetic concerns in several areas of the community.
City Council directed staff on October 10, 2024, to move forward with the removal and replacement of existing sidewalks and landscaping. The areas identified as being in the most critical need of sidewalk replacement include S. Harlan Road, Slate Street, Stonebridge Lane, and Opal Street. Given funding limitations, the City Council has requested that the project be completed in phases. Staff request that City Council approve a Professional Services Agreement ( PSA) with Westwood Professional Services, Inc. in the amount of $ 153, 780 plus an additional 10% totaling $ 169,58 for the design of the Sidewalk and Landscape Improvements Project, CIP PS 25- 14.
BACKGROUND:
On May 2, 2025, staff issued a Request for Proposals ( RFP) for the design of the Sidewalk and Landscape Improvements, Phase I Project, CIP PS 25- 14. Staff received one response from a qualified consultant, Westwood Professional Services, Inc. After a thorough review of the proposal and cost, staff determined that the consultant is well - qualified for the project, submitted a strong proposal, and proposed costs that appear reasonable for the scope of work.
As part of the contract, the consultant will be responsible for preparing four separate bid packages, corresponding to the project' sfour construction phases. Additionally, the consultant will be required to provide bid and construction phase support throughout the duration of the project.
CITY MANAGER' S REPORT PAGE 2
JUNE 9, 2025, CITY COUNCIL REGULAR MEETING
APPROVE PROFESSIONAL SERVICE AGREEMENT WITH WESTWOOD
PROFESSIONAL SERVICES, INC. FOR THE DESIGN OF THE SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14
The construction project will be divided into four phases, covering the following areas:
S. Harlan Road ( between Slate Street and Stonebridge Lane, including the basins), Slate Street, Stonebridge Lane, and Opal Street. The first phase will be selected based on the severity of tripping hazards and the need to restore shaded areas. The scope of work includes removing and replacing damaged sidewalks, removing trees with invasive root systems, and replacing them with non- invasive tree species. In addition, minimal, non- invasive landscaping will be incorporated to enhance the overall aesthetics of the community, as directed by City Council. This design contract will cover the complete design for all four phases of the project.
REASON FOR RECOMMENDATION:
Ensuring the safety of Lathrop residents and maintaining compliance with ADA standards is essential and requires prompt attention. For this reason, staff is requesting that City Council approve a design contract with Westwood Professional Services, Inc. to proceed with the work as outlined in the Professional Services Agreement ( Attachment B).
FISCAL IMPACT:
The cost proposal submitted by Westwood Professional Services, Inc., totals 153, 780. Staff is also recommending a 10% design contingency, equivalent to 15, 378, bringing the total potential project design cost to $ 169,58. This contingency is intended to cover any unanticipated expenses that may arise during the design process. Unforeseen costs, including but not limited to additional surveying or modifications to the design, may arise during the course of the project.
The inclusion of this allowance is intended to mitigate the need for an immediate contract amendment should such unanticipated expenses occur. The Sidewalk and Landscape Improvements, Phase I Project ( CIP PS 25- 14) is an approved project in the City' s Capital Improvement Plan. Sufficient funding has been allocated in the approved CIP to fully cover the total projected cost of design including the design contingency.
Staff request that City Council approve a Professional Services Agreement with Westwood Professional Services, Inc. for the design of the Sidewalk and Landscape Improvements, Phase I Project, CIP PS 25- 14.
ATTACHMENTS:
A. Resolution to Approve a Professional Service Agreement with Westwood Professional Services, Inc. for the design of Sidewalk and Landscape Improvements, Phase I Project, CIP PS 25- 14
B. Professional Services Agreement with Westwood Professional Services, Inc., for the Design of Sidewalk and Landscape Improvements Project, CIP PS 25- 14 CITY MANAGER' S REPORT PAGE 3
JUNE 9, 2025, CITY COUNCIL REGULAR MEETING
APPROVE PROFESSIONAL SERVICE AGREEMENT WITH WESTWOOD
PROFESSIONAL SERVICES, INC. FOR THE DESIGN OF THE SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP 25- 14
APPROVALS
Leisser P. Mazariegos Pate
Project Manager
BraciTaylor
City Engineer
Cari J
Financ3 iretor
Date
2 OZ5
62/ 2025
Date
Ipt5/ 2Pa_ f
Michael King Date
Assistant City Manager
y.
Salvador Navarrete Date
City Attorney
Stephen J. Salvatore Date
City Manager
RESOLUTION NO. 25 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LATHROP TO
APPROVE A PROFESSIONAL SERVICE AGREEMENT WITH WESTWOOD
PROFESSIONAL SERVICES, INC. FOR THE DESIGN OF SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14
WHEREAS, in August of 2000, the Stonebridge Community was established, designed with winding sidewalks, mature shade trees, and attractive landscaping to encourage walking and enjoyment of the scenic surroundings. Over time, however, the tree roots became invasive, lifting and damaging sidewalks throughout the neighborhood and creating numerous tripping hazards; and WHEREAS, City Council directed staff on October 10, 2024, to move forward with the removal and replacement of existing sidewalks and landscaping; and WHEREAS, the areas identified as being in the most need of sidewalk replacement include S. Harlan Road, Slate Street, Stonebridge Lane, and Opal Street.
Given funding limitations, the City Council has requested that the project be completed in phases; and
WHEREAS, on May 2, 2025, staff issued a Request for Proposals ( RFP) for the design of the Sidewalk and Landscape Improvements, Phase I Project, CIP 25- 14; and
WHEREAS, on May 19, 2025, the City received one response from Westwood Professional Services, Inc. After a thorough review of the proposal and cost, City staff determined that the consultant is well - qualified for the project, submitted a strong proposal, and proposed costs appear reasonable for the scope of work; and WHEREAS, the construction project will be divided into four phases, covering the following areas: S. Harlan Road ( between Slate Street and Stonebridge Lane, including the basins), Slate Street, Stonebridge Lane, and Opal Street. The first phase will be selected based on potential tripping hazards and the goal of restoring shaded areas; and
WHEREAS, the cost proposal submitted by Westwood Professional Services, Inc. is $ 153, 780, and staff is also requesting a 10% design contingency, equivalent to $ 15, 378, bringing the total potential project design cost to $ 169,58, to account for any unanticipated expenses that may arise during the design process.
WHEREAS, sufficient funds were allocated to CIP PS 25- 14 to award the Professional Service Agreement; and
NOW THEREFORE, BE IT RESOLVED, that the City Council of the City of Lathrop approve a Professional Services Agreement with Westwood Professional Services, Inc. for the design of the Sidewalk and Landscape Improvements, Phase I Project, CIP 25- 14.
The foregoing resolution was passed and adopted this 9th day of June 2025, by the following vote of the City Council, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
Paul Akinjo, Mayor
APPROVED AS TO FORM:
Teresa Vargas, City Clerk Salvador Navarrete, City Attorney Attachment
CITY OF LATHROP
AGREEMENT FOR PROFESSIONAL SERVICES WITH WESTWOOD
PROFESSIONAL SERVICES, INC.
TO PROVIDE DESIGN FOR
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT
CIP PS 25- 14
THIS AGREEMENT, dated for convenience this 9T" day of June 2025, is by and between Westwood Professional Services, Inc. ("CONSULTANT") and the City of Lathrop, a California municipal corporation (" CITY");
RECITALS:
WHEREAS, CONSULTANT is specially trained, experienced, and competent to perform design services for Sidewalk and Landscape Improvements, Phase I Project, CIP PS 25- 14, which are required by this agreement; and
WHEREAS, CITY selected the CONSULTANT pursuant to said qualifications; and WHEREAS, CONSULTANT is willing to render such Professional Design Services, as hereinafter defined on the following terms and conditions; NOW, THEREFORE, CONSULTANT and the CITY agree as follows:
AGREEMENT
1) Scope of Service
CONSULTANT agrees to design and prepare plans, specifications and an engineering estimate ( PS& E) and to provide engineering support services during construction of Sidewalk and Landscape Improvements, Phase I Project in accordance with the scope of work and fee proposal provided by CONSULTANT, attached hereto as Exhibit " A" and incorporated herein by reference. CONSULTANT represents it is prepared to and can diligently perform these services in accordance with the upmost standards of its profession and to CITY' Ssatisfaction. The fee proposal shall include all reimbursable costs required for the performance of the Scope of Services. Payment of additional reimbursable costs considered to be over and above those inherent in the original Scope of Services shall be approved of in advance and in writing, by the CITY.
2) Compensation
CITY hereby agrees to pay CONSULTANT a sum not to exceed $ 153, 780. 0 for the Professional Services set forth in Exhibit " A". CONSULTANT shall be paid any uncontested sum due and payable within thirty ( 30) days of receipt of billings containing all information pursuant to Paragraph 5 below. Compensation for any task must be equal to or less than the percentage of task complete. In no event shall CONSULTANT be entitled to compensation for work not included in Exhibit " A", unless a written change order or authorization describing the extra work and payment terms has been executed by
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 CITY' s authorized representative prior to the commencement of the work. Payment is made based on a time and materials basis.
3) Effective Date and Term
The effective date of this Agreement is June 9, 2025, and it shall terminate no later than June 30, 2026.
4) Independent Contractor Status
It is expressly understood and agreed by both parties that CONSULTANT, while engaged in carrying out and complying with any of the terms and conditions of this Agreement, is an independent contractor and not an employee of the CITY. As an independent contractor, CONSULTANT is responsible for controlling the means and methods to complete the scope of work described in Exhibit "A" to City' ssatisfaction. CONSULTANT expressly warrants not to represent, at any time or in any manner, that CONSULTANT is an employee of the CITY.
5) Billings
CONSULTANT shall submit invoices for completed work on a monthly basis, or as otherwise agreed, providing without limitation, details as to amount of hours, individual performing said work, hourly rate, and indicating to what aspect of the Scope of Services said work is attributable. CONSULTANT' Sbills shall include a list of all tasks, a total amount due, the amounts previously billed, and the net amount due on the invoice. Except as specifically authorized by CITY, CONSULTANT shall not bill CITY for duplicate services performed by more than one person. In no event shall CONSULTANT submit any billing for an amount in excess of the rates or the maximum amount of compensation provided in section ( 2) for either task or for the entire Agreement, unless modified by a properly executed change order.
6) Advice and Status Reporting
CONSULTANT shall provide the CITY with timely reports, orally or in writing, of all significant developments arising during performance of its services hereunder, and shall furnish to CITY such information as is necessary to enable CITY to monitor the performance of this Agreement.
CONSULTANT shall submit to CITY such reports, diagrams, drawings and other work products developed pursuant to the Scope of Services.
7) Assignment of Personnel
CONSULTANT acknowledges that the CITY has relied on CONSULTANT' s capabilities
and on the qualifications of CONSULTANT' sprincipals and staff as identified in its proposal to CITY. The services shall be performed by, or under the direct supervision, of CONSULTANT' sAuthorized Representative: Chad Kennedy, Director. CITY shall be notified by CONSULTANT of any change of its Authorized Representative, and CITY is granted the right of approval of all original, additional, and replacement personnel at CITY' ssole discretion, and shall be notified by CONSULTANT of any changes of
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 CONSULTANT' sproject staff prior to any change.
CONSULTANT shall assign only competent personnel to perform services pursuant to this Agreement. If CITY asks CONSULTANT to remove a person assigned to the work called for under this Agreement, CONSULTANT agrees to do so immediately, without requiring the City to process a reason or explanation for its request. 8) Assignment and Subcontracting
It is recognized by the parties hereto that a substantial inducement to CITY for entering into this Agreement was, and is, the professional reputation and competence of CONSULTANT. Neither this Agreement nor any interest therein may be assigned by CONSULTANT without the prior written approval of CITY' Sauthorized representative.
CONSULTANT shall not subcontract any portion of the performance contemplated and provided for herein, other than the subcontractors noted in the proposal, without prior written approval of the CITY' Sauthorized representative. 9) Insurance
On or before beginning any of the services or work called for by any term of this Agreement, CONSULTANT, at its own cost and expense, shall carry, maintain for the duration of the Agreement, and provide proof thereof that is acceptable to the CITY the insurance specified in subsections ( a) through ( c) below with insurers and under forms of insurance satisfactory in all respects to the CITY. CONSULTANT shall not allow any subcontractor to commence work on any subcontract until all insurance required of the CONSULTANT has also been obtained for the subcontractor. Verification of this insurance shall be submitted and made part of this Agreement prior to execution. a) Workers' Compensation. CONSULTANT shall, at CONSULTANT' Ssole cost and expense, maintain Statutory Workers' Compensation Insurance and Employer' s Liability Insurance for any and all persons employed directly or indirectly by CONSULTANT. Said Statutory Workers' Compensation Insurance and Employer' s Liability Insurance shall be provided with limits of one million dollars ($ 1, 000,0). In the alternative, CONSULTANT may rely on a self- insurance program to meet these requirements provided that the program of self- insurance complies fully with the provisions of the California Labor Code. The insurer, if insurance is provided, or the CONSULTANT, if a program of self- insurance is provided, shall waive all rights of subrogation against the CITY for loss arising from work performed under this Agreement.
b) Commercial General and Automobile Liability Insurance. CONSULTANT, at CONSULTANT' Sown cost and expense, shall maintain commercial general and automobile liability insurance for the period covered by this Agreement in an amount of one million dollars ($ 1, 000,00) per occurrence, combined single limit coverage for risks associated with the work contemplated by this Agreement. If Commercial General Liability Insurance or an Automobile Liability form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 aggregate limit shall be at least twice the required occurrence limit. Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Agreement, including the use of owned and non -owned automobiles.
Coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 ( ed. 11/ 88) and Insurance Services Office Automobile Liability form CA 0001 ( ed. 12/ 90) Code 1 ( any auto).
Each of the following shall be included in the insurance coverage or added as an endorsement to the policy:
i) CITY, its officers, employees, agents, and volunteers are to be covered as insured with respect to each of the following: liability arising out of activities performed by or on behalf of CONSULTANT, including the insider' s
general supervision of CONSULTANT;
products and completed operations of CONSULTANT; premises owned, occupied or used by CONSULTANT. The coverage shall contain no special limitations on the scope of protection afforded to CITY, its officers, employees, agents, or volunteers.
ii) The insurance shall cover on an occurrence or an accident basis, and not on a claim made basis.
iii) An endorsement must state that coverage is primary insurance and that no other insurance affected by the CITY will be called upon to contribute to a loss under the coverage.
iv) Any failure of CONSULTANT to comply with reporting provisions of the policy shall not affect coverage provided to CITY and its officers, employees, agents, and volunteers.
v) Insurance is to be placed with California - admitted insurers with a Best' s rating of no less than A: VII.
vi) Notice of cancellation or non -renewal must be received by CITY at least thirty days prior to such change (ten days if cancellation is due to nonpayment of premium).
c) Professional Liability. CONSULTANT, at CONSULTANT' Sown cost and expense, shall maintain for the period covered by this Agreement professional liability insurance for licensed professionals performing work pursuant to this Agreement in an amount of Two Million Dollars ($ 2, 000,0) per claim made and per policy aggregate covering the licensed professionals' errors and omissions, as follows:
i) Notice of cancellation, must be received by the CITY at least thirty days prior to such change ( ten days if cancellation is due to nonpayment of premium) shall be included in the coverage or
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 added as an endorsement to the policy.
ii) The policy must contain a cross liability or severability of interest clause.
iii) The following provisions shall apply if the professional liability coverages are written on a claims made form:
1. The retroactive date of the policy must be shown and must be before the date of the Agreement.
2. Insurance must be maintained and evidence of insurance must be provided for at five years after completion of the Agreement or the work, so long as commercially available at reasonable rates.
3. If coverage is canceled or not renewed and it is not replaced with another claims made policy form with a retroactive date that precedes the date of this Agreement, CONSULTANT
must provide extended reporting coverage for five years after completion of the Agreement or the work. The CITY shall have the right to exercise at the CONSULTANT' Scost, any extended reporting provisions of the policy should the CONSULTANT cancel or not renew the coverage.
4. A copy of the claim reporting requirements must be
submitted to the CITY prior to the commencement of any
work under this Agreement.
d) Deductibles and Self -Insured Retentions. CONSULTANT shall disclose the self -insured retentions and deductibles before beginning any of the services or work called for by any term of this Agreement. During the period covered by this Agreement, upon express written authorization of the CITY' s authorized representative, CONSULTANT may increase such deductibles or self -insured retentions with respect to CITY, its officers, employees, agents, and volunteers. The CITY' sauthorized representative may condition approval of an increase in deductible or self -insured retention levels upon a requirement that CONSULTANT procure a bond guaranteeing payment of losses and related investigations, claim administration, and defense expenses that is satisfactory in all respects to each of them.
e) Notice of Reduction in Coverage. In the event that any coverage required under subsections ( a), (b), or (c) of this section of the Agreement is reduced, limited, or materially affected in any other manner, CONSULTANT shall provide written notice to CITY at CONSULTANT' Searliest possible opportunity and in no case later than five days after CONSULTANT is notified of the change in coverage.
f)In addition to any other remedies CITY may have if CONSULTANT fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, CITY may, at its sole option:
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 i) Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement;
ii) Order CONSULTANT to stop work under this Agreement or withhold any payment which becomes due to CONSULTANT
hereunder, or both stop work and withhold any payment, until CONSULTANT demonstrates compliance with the requirements hereof;
iii) Terminate this Agreement.
Exercise of any of the above remedies, however, is an alternative to other remedies CITY may have and is not the exclusive remedy for CONSULTANT' Sbreach.
10) Indemnification - CONSULTANT' SResponsibility
As to the CONSULTANT' S work hereunder, it is understood and agreed that ( a) CONSULTANT has the professional skills necessary to perform the work, (b) CITY relies upon the professional skills of CONSULTANT to perform the work in a skillful and professional manner, and ( c) CONSULTANT thus agrees to so perform.
Acceptance by CITY of the work performed under this Agreement does not operate as a release of said CONSULTANT from such professional responsibility for the work performed. It is further understood and agreed that CONSULTANT is apprised of the scope of the work to be performed under this Agreement and CONSULTANT agrees that said work can and shall be performed in a fully competent manner in accordance with the standard of care applicable to CONSULTANT' Sprofession.
CONSULTANT shall indemnify, defend ( except for professional liability claims) and hold CITY, its officers, employees, and volunteers harmless from and against any and all liability, claims, suits, actions, damages, and causes of action arising out of any personal injury, bodily injury, loss of life, or damage to property, or any violation of applicable federal, state, or municipal law or ordinance, to the extent caused by the willful misconduct or negligent acts or omissions of CONSULTANT, its employees, subcontractors, or agents, or on account of the performance or character of this work, except for any such claim arising out of the negligence or willful misconduct of the CITY, its officers, employees, agents, or volunteers. It is understood that the duty of CONSULTANT to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. Acceptance of insurance certificates and endorsements required under this Agreement does not relieve CONSULTANT from liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages. 11) Licenses
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 If a license of any kind, which term is intended to include evidence of registration, is required of CONSULTANT, its employees, agents, or subcontractors by federal or state law, CONSULTANT warrants that such license has been obtained, is valid and in good standing, and CONSULTANT shall keep it in effect at all times during the term of this Agreement, and that any applicable bond has been posted in accordance with all applicable laws and regulations.
12) Business Licenses
CONSULTANT shall obtain and maintain a CITY of Lathrop Business License until all Agreement services are rendered and accepted by the CITY. 13) Termination
Either CITY or CONSULTANT may cancel this Agreement upon 30 days written notification to the other party. Upon termination, or completion of services under this Agreement, all information collected, work product and documents shall be delivered by CONSULTANT to CITY within ten ( 10) calendar days.
14) Funding
CONSULTANT agrees and understands that renewal of this agreement in subsequent years is contingent upon action by the City Council consistent with the appropriations limits of Article XIII ( B) of the California Constitution and that the Council may determine not to fund this agreement in subsequent years.
15) Notices
All contracts, appointments, approvals, authorizations, claims, demands, Change Orders, consents, designations, notices, offers, requests and statements given by either party to the other shall be in writing and shall be sufficiently given and served upon the other party if ( 1) personally served, (2) sent by the United States mail, postage prepaid, (3) sent by private express delivery service, or (4) in the case of a facsimile transmission, if sent to the telephone FAX number set forth below during regular business hours of the receiving party and followed with two ( 2) Days by delivery of a hard copy of the material sent by facsimile transmission. Personal service shall include, without limitation, service by delivery and service by facsimile transmission.
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 To City:
Copy to:
To Consultant:
Copy to:
16) Miscellaneous
City of Lathrop
City Clerk
390 Towne Centre
Lathrop, CA 95330
City of Lathrop
Department of Public Works
390 Towne Centre
Lathrop, CA 95330
MAIN: ( 209) 941- 7430
FAX: ( 209) 941- 7449
Westwood Professional Services, Inc.
1165 Scenic Drive, Suite A
Modesto, CA 95350
FED ID # 41- 1617552
Bus License # 21271
Westwood Professional Services, Inc.
2805 North Dallas Parkway, Suite 150
Plano, Texas 75093
Attn: General Counsel
legal@westwoodpss. com
a) Consent. Whenever in this Agreement the approval or consent of a party is required, such approval or consent shall be in writing and shall be executed by a person having the express authority to grant such approval or consent. b) Contract Terms Prevail. All exhibits and this Agreement are intended to be construed as a single document. Should any inconsistency occur between the specific terms of this Agreement and attached exhibits, the terms of this Agreement shall prevail.
c) Controlling Law. The parties agree that this Agreement shall be governed and construed by and in accordance with the Laws of the State of California. d) Definitions. The definitions and terms are as defined in these specifications. e) Force Majeure. Neither party shall be deemed to be in default on account of any delay or failure to perform its obligations under this Agreement, which directly results from an Act of God, pandemic, epidemic, or an act of a superior governmental authority.
f) Headings. The paragraph headings are not a part of this Agreement and shall have no effect upon the construction or interpretation of any part of this Agreement.
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 g) Incorporation of Documents. All documents constituting the Agreement documents described in Section 1 hereof and all documents which may, from time to time, be referred to in any duly executed amendment hereto are by such reference incorporated in the Agreement and shall be deemed to be part of this Agreement.
h) Integration. This Agreement and any amendments hereto between the parties constitute the entire Agreement between the parties concerning the Project and Work, and there are no other prior oral or written agreements between the parties that are not incorporated in this Agreement.
Modification of Agreement. This Agreement shall not be modified or be binding upon the parties unless such modification is agreed to in writing and signed by the parties.
Ownership of Documents. All documents, photographs, reports, analyses, audits, computer media, or other material documents or data, and working papers, whether or not in final form, which have been obtained or prepared under this Agreement, shall be deemed the property of the CITY upon final payment for services rendered. Upon CITY' s request, CONSULTANT shall allow CITY to inspect all such documents during the CONSULTANT' sregular business hours.
Any reuse of modification of the foregoing materials without the engagement of CONSULTANT shall be at CITY' ssole risk and without legal exposure of liability to CONSULTANT
k) Provision. Any agreement, covenant, condition, clause, qualification, restriction, reservation, term or other stipulation in the Agreement shall define or otherwise control, establish or limit the performance required or permitted or to be required of or permitted by either party. All provisions, whether covenants or conditions, shall be deemed to be both covenants and conditions.
I) Severability. The invalidity in whole or part of any provision of this Agreement shall not void or affect the validity of any other provision of this agreement. If a court of competent jurisdiction finds or rules that any provision of this Agreement is void or unenforceable, the provisions of this Agreement not so affected shall remain in full force and effect.
m) Status of CONSULTANT. In the exercise of rights and obligations under this Agreement, CONSULTANT acts as an independent contractor and not as an agent or employee of CITY. CONSULTANT shall not be entitled to any rights and benefits accorded or accruing to the City Council members, officers or employees of CITY, and CONSULTANT expressly waives any and all claims to such right and benefits.
n) Successors and Assigns. The provisions of this Agreement shall inure to the benefit of, and shall apply to and bind, the successors and assigns of the parties. o) Time is of the cardinal importance for this Agreement and each of its provisions.
In the calculation of time hereunder, the time in which an act is to be performed
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
SIDEWALK AND LANDSCAPE IMPROVEMENTS, PHASE I PROJECT, CIP PS 25- 14 shall be computed by excluding the first Day and including the last. If the time in which an act is to be performed falls on a Saturday, Sunday or any Day observed as a legal holiday by CITY, the time for performance shall be extended to the following Business Day.
P)
q)
Venue. In the event that suit is brought by either party hereunder, the parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of San Joaquin or in the United States District Court for the Eastern District of California.
Recovery of Costs. The prevailing party in any action brought to enforce the terms of this Agreement or arising out of this Agreement may recover its reasonable costs, including reasonable attorney' sfees, incurred or expended in connection with such action against the non -prevailing party.
17) Notice to Proceed
Prior to commencing work under this agreement, CONSULTANT shall receive a written Notice to Proceed" from CITY. A Notice to Proceed shall not be issued until all necessary bonds and insurances have been received. City shall not be obligated to pay CONSULTANT for any services prior to issuance of the Notice to Proceed. 18) Signatures
The individuals executing this Agreement represent and warrant that they have the right, power, legal capacity, and authority to enter into and to execute this Agreement on behalf of the respective legal entities of the CONSULTANT and the CITY. This agreement shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns.
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
STONEBRIDGE SIDEWALK AND LANDSCAPE REHABILITATION PROJECT, CIP PS 25- 14 Approved as to Form:
Recommended for Approval:
Approved by:
Consultant:
City of Lathrop
City Attorney
Salv ..: rr ' avarrete Date
City of Lathrop
City Engineer
Brad Taylor Date
City of Lathrop
390 Towne Centre Drive
Lathrop, CA 95330
Stephen J. Salvatore Date
City Manager
Westwood Professional Services, Inc.
1165 Scenic Drive, Suite A
Modesto, CA 95350
FED ID # 41- 1617552
Bus License # 21271
Signature Date
Chad Kennedy, Director
CITY OF LATHROP - WESTWOOD PROFESSIONAL SERVICES, INC.
TO PROVIDE PROFESSIONAL SERVICES FOR THE DESIGN OF
STONEBRIDGE SIDEWALK AND LANDSCAPE REHABILITATION PROJECT, CIP PS 25- 14 Westwood Professional Services, Inc.
1165 Scenic Drive, Suite A
Modesto, CA 95350
FED ID # 41- 1617552
Bus License # 21271
Signature Date
Dylan Crawford, Sr. Director
EXHIBIT "A"
Westwood
1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
May 19, 2025
Leisser Mazariegos, Project Manager
City of Lathrop, Public Works Department
390 Towne Center Drive
Lathrop, Ca 95330
Re: Proposal of Services for Stonebridge Sidewalk and Landscape Rehabilitation Project Dear Leisser,
Safe, well -maintained sidewalks are essential for ensuring pedestrian mobility, accessibility, and safety within a community. Cracked orlifted pavement not only poses serious trip hazards —especially for children, seniors, and individuals with mobility challenges —but also discourages walking and outdoor activity. At the same time, thoughtfully designed landscaping, including trees, ground cover, shrubs, and other plant materials, adds significant community value. Trees provide much -needed shade, helping to cool the environment and improve comfort for pedestrians, while diverse plantings enhance the visual appeal and character of neighborhoods. Together, safe sidewalks and attractive landscaping contribute to a more walkable, inviting, and livable environment that benefits residents and visitors alike, promoting health, connection, and pride in the community.
Westwood and Jesse Grafton would be honored to continue our partnership with the City of Lathrop to advance the Stonebridge Sidewalk and Landscape Rehabilitation Project. Building on the momentum of the initial conceptual phase, we are excited to support the next steps through a comprehensive site assessment, preparation of Plans, Specifications, and Estimates ( PS& E), and construction phase assistance. Our goal is to help finalize a practical, high -quality design that addresses current infrastructure challenges while enhancing the overall landscape. We are committed to delivering improvements that increase pedestrian safety, elevate the aesthetic appeal of the neighborhood, and contribute to the long- term enjoyment and well- being of the Stonebridge Community.
Attached to this letter is our:
Project Understanding
Project Approach
Project Schedule
Scope of Work
Mapping Limits Exhibit
Cost Proposal
Schedule of Fees
Sincer
C ad Kennedy, CLARB ) 5SI, LEED BD+ C, ISA Certified Arborist, Director Westwood Professional Services, Inc.
chad. kennedy@westwoodps. com
Direct: 209. 47.057
Page lof11
westwoodps. com
888) 937- 5150
Westwood
Project Understanding
The Westwood team recognizes that the City of Lathrop has experienced ongoing challenges with mature trees planted in undersized landscape areas, leading to sidewalk upheaval and unsafe trip hazards. In particular, the recent removal of many trees in the Stonebridge Community has resulted in reduced shade and increased pedestrian risks. This project is focused on addressing and improving the existing sidewalk infrastructure within the community.
Westwood has previously assisted the City with conceptual designs for this effort. As part of our recommendations, we propose several landscape upgrades, including converting overhead spray irrigation in tree and shrub areas to more efficient low -flow systems, relocating sidewalks where feasible to widen planter areas for new tree installation, and incorporating root barriers to guide root growth downward. These measures aim to support long- term sidewalk stability while allowing for the reintroduction of trees and landscaping that enhance aesthetic appeal, provide shade, and minimize future maintenance concerns.
1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
Project Approach
Westwood Professional Services is pleased to offer professional land surveying and design support services for the Stonebridge Sidewalk and Landscape Rehabilitation Project. Following our collaborative work with the City of Lathrop' s
Public Works Department —developing high- level
conceptual landscape options and associated ROM ( Rough Order of Magnitude) cost estimates for presentation to City Council —we are honored to continue supporting this important community improvement effort.
Jesse Grafton, PLA, a licensed landscape architect, will lead this project. Jesse brings deep experience working with the City of Lathrop, including leading the previous phase of this project, where he guided the development of conceptual designs and landscape strategies in coordination with City staff. He has successfully managed numerous public sector projects involving sidewalk infrastructure and tree - related improvements, making him especially well -suited to navigate the unique challenges of this effort. His expertise in integrating tree selection, root management, and sustainable landscape design into functional and safe public spaces is a key asset for this rehabilitation project.
With offices in both Modesto and Pleasanton, our team is local and familiar with City processes and expectations. We will begin with an in -person kickoff meeting to confirm the City' s design intent, budget parameters, and any site constraints. Our team will carefully review sidewalk upheaval conditions, evaluate feasible realignment options, and initiate early discussions regarding preferred tree species, spacing, root barrier installation, and irrigation system improvements. These proactive steps will help ensure long- term functionality, safety, and visual appeal for the Stonebridge Community.
westwoodps. com
888) 937- 5150
Westwood
Project Schedule
We have reviewed the anticipated schedule provided in the RFP and have provided the following revisions to the milestones from NTP to bid ready PS& Es as indicated below. 1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
Award Design Contract (Consultant NTP)
Kick- off Meeting in person
Topographic Mapping and Survey Completion
Submittal 35% Design Completion
Submittal 60% Design Completion
Submittal 100% Design Completion
Bid Ready PS& Es
Early July 2025
Mid July 2025
Week of August 25th, 2025
Week of September 22nd, 2025
Week of October loth, 2025
Week of November i7th, 2025
Week of December 8th, 2025
All of the dates above are predicated on receiving the Contract Award and Notice to Proceed in early July 2025. Please note that it will take approximately 6 weeks for field work and data collection associated with the proposed topographic mapping and survey to be completed. An approximate City review and comment timeline of 2 weeks per submittal review is anticipated.
Scope of Work
Task 1: Topographic Survey Base Mapping
Ground -based topographic surveying will form the basis of this design project. This task includes establishing primary survey control to support the project through construction and a detailed collection of site information such as surface features, structures, utilities, and other information that cannot be accurately documented through any other means. Obstructed or inaccessible areas may not be mapped. Research, mapping, potholing, locating, or any other form of subsurface utility investigation or verification is not expected for this work and is excluded.
Survey deliverables will be based on the NAD83 horizontal datum and the NAVD88 vertical datum using City of Lathrop benchmarks. A survey control statement will be provided, including: the location, elevation, and description of the benchmark utilized, as well as a horizontal survey coordinate table with the point number, northing, easting, and description for at least three ( 3) points.
We will do the following:
a. Perform cross- section survey of linear corridor at 25 -foot intervals. b. Perform topographic survey of all hardscape and softscape, including: grade breaks, high points, low points, and areas where sidewalk is broken or lifted. c. Locate surface -visible utility features and improvements, such as: signs, fences, walls, buildings, striping, driveways, walkways, drainages, structures, lights, poles, bollards, general limits of vegetated or landscaped areas, USA markings, vaults, valves, meters, boxes, pedestals, cleanouts, manholes, drain inlets, catch basins, culverts, outfalls, and standpipes. d. Locate all trees. Does not include mapping of shrubs, or other minor vegetation. e. Create existing ground Civil 3D TIN surface model.
f. Prepare topographic survey base map drawing at a 1" = 20' scale.
westwoodps. com
888) 937- 5150
Westwood
1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
DELIVERABLES
Digital copy of the topographic survey base map drawing in AutoCAD Civil 3D 2023 format.
PDF copy of topographic survey on Westwood title block.
Task lb: Subsurface Utility Research and Base Mapping (OPTIONAL) This task is intended to provide a cost- effective glimpse of any existing above and below -ground utility installations which may be consequential to the design, placement of improvements, or construction means and methods. It is not a substitute for more definitive means of locating subsurface utilities such as potholing or other indirect, nondestructive means), but it is highly informative and can be leveraged to help narrow the focus of those other methods considerably, saving cost and reducing project risk and complexity. In this optional task, if executed, we will:
a. Compile a list of utility companies who may have facilities in the vicinity of project. b. Request copies of existing maps, GIS data, improvement plans, as- builts, record drawings, etc. from each utility operator that shows their existing subsurface infrastructure within the project limits.
c. Use compiled records together with field observed surface evidence to prepare a subsurface utility base map drawing, and incorporate the information into the topographic survey. d. Where possible, existing utility meta information will be annotated on the base mapping to reflect available details extracted from the provided utility drawings. e. This task is intended to be consistent with Utility Quality Level C as described in Section 5 of the publication CI/ ASCE 38- 02 (Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data).
DELIVERABLES
Utility mapping will be incorporated into Topographic Survey Base Mapping deliverables.
PDF copies of utility as -built plans used to create utility facility mapping.
PDF copy of utility contact log.
Task lc: Conceptual Boundary Base Mapping ( OPTIONAL)
Where high quality records and information are available, and the project conditions allow for it, a conceptual boundary provides a low- cost option to get an overview of the existing configuration of parcel lines, road rights of way, easements, etc. The conceptual boundary base map drawing will give insights into areas where there may be a need for further investigation due to lack of information, conflicting records, or other matters affecting the property. In this optional task, if executed, we will:
a. Prepare a conceptual property boundary/ rod right- of- way linework base map drawing covering the subject mapping limits area. Linework will be based solely on record information from filed survey maps, recorded documents, and any other client -provided information, then placed relative to other deliverables using a limited amount of physical evidence. b. This is not a resolved boundary; no boundary analysis or adjustment will be performed. The following limitations apply:
1. Excludes setting of monuments or filing maps/ corner records.
2. Excludes review of adjoining property deeds or resolution of conflicting title evidence.
3. Excludes obtaining a title report. However, if one is provided it will be reviewed and any applicable exceptions will be plotted from record where possible.
westwoodps. com
888) 937- 5150
Westwood
1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
c. Plotting of easements or other encumbrances is limited to readily available information obtained by or discovered throughout the process of researching relevant maps, documents, and title reports ( if provided). Additional encumbrances may exist. No guarantee is made as to the completeness of said information.
d. This item is conditional on finding sufficient corners set by previous surveys. If property corner monuments of record have been destroyed, do not fit, or were never set, then pursuant to the Professional Land Surveyors' Act, additional surveying and a " Record of Survey" or a Corner Record" may be required to resolve the boundary. If additional surveying is necessary, a briefing with the Client will be arranged, and work will proceed only after authorization from the Client.
DELIVERABLES
Digital copy of the conceptual boundary linework drawing in AutoCAD Civil 3D 2023 format.
Task 2: Construction Documents ( PS& Es)
Based upon the topographic survey by Westwood and City approved conceptual design, the Westwood design team will prepare complete improvement plans, technical specifications, and cost opinion for City review and comment at the 35%, 60%, and i00% stages. Per the RFP, the design will be completed in a single phase. We do not expect to need Geotech, structural or electrical services.
Construction documents are expected to include the following:
a. Attend one ( 1) in -person kick- off meeting with City.
1. Agenda and meeting minutes will be provided.
b. Attend one ( 1) progress meeting for each submittal phase.
1. Assumes one virtual meeting per submittal = three ( 3) meetings total.
2. Agenda and meeting minutes will be provided.
3. Additional meetings will be billed at hourly rates provided in the attached fee schedule. c. Improvement Plans to include:
1. Cover Sheet with Project Information.
2. Notes Sheet.
3. Demolition Plans showing existing sidewalk, irrigation, tree and plant material based off topographic survey by Westwood).
4. Erosion Control Plans. (SWPPP & QSP services will be a contractor responsibility)
5. Grading Plans.
6. Layout and Horizontal Control Plans.
7. Irrigation Plans Including:
i. Irrigation plans conforming to City and State MWELO requirements. ii. Irrigation water use calculations ( MAWA/ EU).
iii. Irrigation schedule ( pre and post establishment).
8. Planting Plans Including:
i. Planting plans conforming to City and State MWELO requirements. ii. Planting legend.
westwoodps. com
888) 937- 5150
Westwood
9. Landscape Construction Details Including:
i. References to City Standard Details.
ii. Landscape Details.
iii. Irrigation Details.
iv. Planting Details.
v. Note: City detail revisions not included.
d. Technical Specifications (Excluding Division oo and Front End). e. Bid Quantity Sheet.
f. Bid Item Descriptions.
g. Cost Estimate at each submittal phase (3 total).
h. Respond to City comments at each submittal phase ( 3 total).
DELIVERABLES
Plans, Technical Specifications, and Cost Estimates ( PDF) 1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
Task 3: Bidding & Construction Support
a. Westwood will perform bidding and contract award support services to assist the City with selecting appropriate contractors and product manufacturers. Within the budgeted allocation and upon the request of City staff, services may include:
1. Attendance at pre -bid meeting.
2. Response to bidder RFIs.
3. Design support for bidding addendums.
b. Westwood will perform construction support services throughout the project' scompletion.
Within the budgeted allocation and upon the request of City staff, services rendered may include:
1. Attendance at the pre -construction meeting.
2. Review and approval of contractor' sschedule, RFIs, and submittals
3. Review of change orders related to design.
4. Review of shop drawings and submittals.
5. Construction observation site visits by Westwood figured at two (2) per construction phase with eight ( 8) max meeting allocated.
6. Preparation of as -built drawings from contractor -maintained and submitted field drawings.
7. Review of contractor provided traffic control plans.
DELIVERABLES
Electronic Copies ( PDF)
westwoodps. com
888) 937- 5150
Westwood
1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
Task 4: Construction Staking
a. Construction staking is highly recommended to ensure accuracy between the construction documents and the project construction phases. Westwood can provide construction staking services upon written request by the City. Our fees are based on two ( 2) mobilizations for construction phase 1. Restaking outside of these mobilizations will be considered an additional service.
DELIVERABLES
One Set of Construction Stakes ( Per Mobilization)
Task 5: Reimbursables
a. Reimbursables are estimated to include the following costs:
1. Mileage for meetings and construction admin travel.
2. Printing final submittal package hard copies if requested.
Client to Provide
Existing utility records, including as- builts, record drawings, plans, or GIS information, knowingly possessed by or available to client/ owner.
City Staff recommendations for improvements.
All agency fees
Site access.
Limitations/ Assumptions/ Understandings
Scope services outside of written scope are excluded.
Notes
Land surveyors, civil engineers, and landscape architects are licensed by the State of California.
Additional services and/ or meetings requested by the City may be performed on a time -and - materials basis in accordance with the attached rate table. Prior written approval is required.
westwoodps. com
888) 937- 5150
AW ,
Westwood
Cost Proposal
Task Description
1 Topographic Survey
2 Construction Documents ( PS& Es)
3 Bidding and Construction Support
4 Construction Staking ( Phase 1)
5a Reimbursables ( Printing)
5b Reimbursables ( Travel)
TOTAL
Fee
40, 000.
83, 500. 0
18, 600. 0
9, 680. 0
1, 500. 0
500. 00
153, 780. 0
lb Utility Research & Base Mapping ( OPTIONAL) $ 4, 000. lc Conceptual Boundary Base Mapping ( OPTIONAL) $ 8, 000. 1165 Scenic Drive, Suite A
Modesto, CA 95350
Fee Type
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
main ( 209) 571- 1765
Fees are valid for 90 calendar days from the date listed on the cover sheet ofthe proposal. All time and material basis work ( including additional services, ifany) will be performed pursuant to the currentfee schedule ( a
copy ofwhich is attached) unless otherwise negotiated or approved.
westwoodps. com
888) 937- 5150
Westwood
Schedule of Fees
2025 — California - PW
1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
Classification Hourly Rate
Admin I $ 12O. 00
Admin II $ 130. 00
Admin III $ 140. 00
Admin IV $ 160. 00
Admin V $ 175. 00
Intern I $ 95• oo
Intern II $ 115. 00
Intern III $ 130. 00
Engineering Tech I $ 11o. 00
Engineering Tech II $ 130. 00
Engineering Tech III $ 145. 00
Engineering Tech IV $ 165. 00
Engineering Tech V $ 175. o0
Engineering Tech VI $ 190. 00
Engineering Tech VII $ 21O. oO
Graduate Engineer I $ 160. 00
Graduate Engineer II $ 170. 00
Graduate Engineer III $ 180. 00
Graduate Engineer IV $ 190. 00
Engineer I $ 195• oo
Engineer II $ 205. 00
Engineer III $ 22O. OO
Engineer IV $ 240. 00
Engineer V $ 275. 00
Engineer VI $ 290. 00
Engineer VII $ 305. 00
Graduate Landscape Designer I $ 150. 00
Graduate Landscape Designer II $ 165. 00
Graduate Landscape Designer III $ 175. 00
Landscape Architect I $ 170. 00
Landscape Architect II $ 180. 00
Landscape Architect III $ 190. 00
Landscape Architect IV $ 21O. 00
Landscape Architect V $ 230. 00
Landscape Architect VI $ 250. 00
Assistant Project Manager I $ 2OO. OO
Assistant Project Manager II $ 215. 00
Assistant Project Manager III $ 225. 00
westwoodps. com
888) 937- 5150
Westwood
1165 Scenic Drive, Suite A
Modesto, CA 95350
main ( 209) 571- 1765
Project Manager I $ 210. OO
Project Manager II $ 235. 00
Project Manager III $ 255. 00
Project Manager IV $ 280. 00
Project Manager V $ 300. 00
Project Manager VI $ 315. 00
Project Manager VII $ 330. 00
Survey Field I $ 2OO. OO
Survey Field II $ 2O0. OO
Survey Field III $ 240. 00
Survey Field IV $ 265. 00
Survey Field V $ 180. 00
Survey Field VI $ 240. 00
Survey Field VII $ 250. 00
Survey Tech I $ 115. 00
Survey Tech II $ 130. 00
Survey Tech III $ 145. 00
Survey Tech IV $ 170. 00
Survey Tech V $ 190. 00
Survey Tech VI $ 205. 00
Graduate Surveyor I $ 150. 00
Graduate Surveyor II $ 165. 00
Graduate Surveyor III $ 175. 00
Surveyor I $ 170. 00
Surveyor II $ 190. 00
Surveyor III $ 215. 00
Surveyor IV $ 235. 00
Surveyor V $ 250. 00
Surveyor VI $ 270. 00
Project Processor I $ 90. 00
Project Processor II $ 11o. 00
Project Coordinator I $ 140. 00
Project Coordinator II $ 150. 00
Project Coordinator III $ 160. 00
Senior Project Coordinator I $ 170. 00
Senior Project Coordinator II $ 185. 00
Field Engineer I $ 115. 00
Field Engineer II $ 130. 00
Field Engineer II $ 150. 00
Field Engineer IV $ 160. 00
Charges for Other Direct Costs, Outside Services, and facilities furnished by Westwood are computed on the basis of actual cost- plus 15 percent.
westwoodps. com