City of Lemon Grove
City Council Regular Meeting Agenda
Tuesday, January 18, 2022 6:00 p.m.
Lemon Grove Community Center
3146 School Lane, Lemon Grove, CA 91945
For everyone’s protection, all attendees must maintain a safe social distance and face coverings will be required to attend the meeting City Council
Racquel Vasquez, Mayor
Jerry Jones, Mayor Pro Tem
Jennifer Mendoza, Councilmember
Liana LeBaron, Councilmember
George Gastil, Councilmember
A complete agenda packet is available for review on the City’s website The City Council also sits as the Lemon Grove Housing Authority, Lemon Grove Sanitation District Board, Lemon Grove Roadway Lighting District Board, and Lemon Grove Successor Agency
Call to Order
Pledge of Allegiance
Changes to the Agenda
Public Comment
Digitally submitted public comments received by the City Clerk at [email protected] will not be read out-loud during the meeting. However, they will be provided to the City Council and remain part of the meeting’s records. Per the Lemon Grove Municipal Code Section 2.14.150, live comments are allotted a maximum of three (3) minutes.
Consent Calendar
(Note: The items listed on the Consent Calendar will be enacted in one motion unless removed from the Consent Calendar by Council, staff, or the public.)
1.A Waive Full Text Reading of All Ordinances on the Agenda Reference: Kristen Steinke, City Attorney
Recommendation: Waive the full text reading of all ordinances included in this agenda; Ordinances shall be introduced and adopted by title only.
1.B City of Lemon Grove Payment Demands
Reference: Rod Greek, Interim Administrative Services Director Recommendation: Ratify Demands
1.C Accept the Public Works Yard Wall Replacement Project as Complete (Contract No. 2021-20)
Reference: Michael Stauffer, Senior Management Analyst and Mike James, Assistant/Public Works Director
Recommendation: Adopt a resolution accepting the Public Works Yard Wall Replacement Project as complete (Contract No. 2021-20).
City of Lemon Grove City Council Meeting January 18, 2022
1.D Accept the Berry Street Park Walking Path Extension Project as Complete (Contract No. 2021-21)
Reference: Michael Stauffer, Senior Management Analyst and Mike James, Assistant/Public Works Director
Recommendation: Adopt a resolution (Attachment A) accepting the Berry Street Park Walking Path Extension Project as complete (Contract No. 2021-21).
Reports to Council:
2. Approve a Memorandum of Understanding with San Diego Metropolitan Transit System for Bus Shelter and Bench Advertising
Reference: Mike James, Assistant/Public Works Director
Recommendation: Adopt a resolution approving a memorandum of understanding with San Diego Metropolitan Transit System for Bus Shelter and Bench Advertising.
3. Award an Agreement with Rick Engineering Company to Design the Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Replacement and Maintenance Project (Contract No. 2021-24)
Reference: Mike James, Assistant/Public Works Director and Michael Stauffer, Senior Management Analyst
Recommendation: Adopt a resolution awarding an agreement with Rick Engineering Company to design the Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Replacement and Maintenance Project (Contract No. 2021- 24).
4. Appointment of City Council Member to Committees, Commissions, and Boards Reference: Racquel Vasquez, Mayor
Recommendation: Ratify the Mayor’s Committees, Commissions and Boards assignments for City Council Members.
City Council Reports on Meetings Attended at the Expense of the City (GC 53232.3 (d)) (53232.3. (d) states that members of a legislative body shall provide brief reports on meetings attended at the expense of the local agency at the next regular meeting of the legislative body.) City Manager Report
Closed Session:
a. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
Government Code § 54956.9(a)
Name of Case: City of Lemon Grove v. NV5, Inc. et al. (SDSC Case No.: 37-2020- 00022512-CU-CO-CTL)
City of Lemon Grove City Council Meeting January 18, 2022 Adjournment
AFFIDAVIT OF NOTIFICATION AND POSTING
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO ) SS
CITY OF LEMON GROVE )
I, Audrey Malone, City Clerk of the City of Lemon Grove, hereby declare under penalty of perjury that a copy of the above Agenda of the Regular Meeting of the City Council of the City of Lemon Grove, California, was delivered and/or notice by email not less than 72 hours, before the hour of 6:00 p.m. on January 13, 2021 to the members of the governing agency, and caused the agenda to be posted on the City’s website at www.lemongrove.ca.gov and at Lemon Grove City Hall, 3232 Main Street Lemon Grove, CA 91945.
/s/: Audrey Malone
Audrey Malone, City Clerk
In compliance with the Americans with Disabilities Act (ADA), the City of Lemon Grove will provide special accommodations for persons who require assistance to access, attend and/or participate in meetings of the City Council. If you require such assistance, please contact the City Clerk at (619) 825-3800 or email [email protected]. A full agenda is available for public review at City Hall.
CITY OF LEMON GROVE
CITY COUNCIL
STAFF REPORT
Item No. 1.A
Meeting Date: January 18, 2022
Submitted to: Honorable Mayor and Members of the City Council Department: City Manager’s Office
Staff Contact: Kristen Steinke, City Attorney
Item Title: Waive the Full Text Reading of all Ordinances Summary: Waive the full text reading of all ordinances included in this agenda.
Ordinances shall be introduced and adopted by title only.
Environmental Review:
Not subject to review Negative Declaration
Categorical Exemption, Section Mitigated Negative Declaration Fiscal Impact: None.
Public Notification: None.
CITY OF LEMON GROVE
CITY COUNCIL
STAFF REPORT
Item No. 1.B
Meeting Date:
Submitted to:
Department:
Staff Contact:
Item Title:
January 18, 2022
Honorable Mayor and Members of the City Council
City Manager’s Office
Rod Greek, Interim Administrative Services Director
[email protected]
City of Lemon Grove Payment Demands
Recommended Action: Ratify Demands.
Environmental Review:
Not subject to review Negative Declaration
Categorical Exemption, Section Mitigated Negative Declaration Fiscal Impact: None.
Public Notification: None.
City of Lemon Grove Demands Summary
Approved as Submitted:
Yolanda Cerezo, Interim Finance Manager ACH/AP Checks 12/10/21‐01/05/22 2,226,466.49 For Council Meeting: 01/18/22
Payroll ‐ 12/14/21 125,295.89
Payroll ‐ 12/28/21 118,201.58
Total Demands 2,469,963.96
CHECK NO INVOICE NO VENDOR NAME CHECK DATE Description INVOICE AMOUNT CHECK
AMOUNT
ACH Nov21 Wells Fargo 12/10/2021 Credit Card Processing‐Mo.Svc ‐ Nov'21 9.95 766.49 Credit Card Transaction Fees ‐ Nov'21 756.54
ACH Nov21 Wells Fargo 12/13/2021 Bank Service Charge ‐ Nov'21 418.09 418.09 ACH Nov21 Home Depot Credit Services 12/13/2021 Home Depot Purchases ‐ Nov'21 958.91 958.91 ACH Sep21 San Diego County Sheriff's Department 12/15/2021 Law Enforcement Services ‐ Sep'21 538,800.90 538,800.90 ACH Dec14 21 Employment Development Department 12/16/2021 State Taxes 12/14/21 7,690.26 7,690.26 ACH 376109 Aflac 12/16/2021 AFLAC Insurance 12/15/21 1,689.44 1,689.44 ACH Dec1‐Dec14 21 Calpers Supplemental Income 457 Plan 12/17/2021 457 Plan 12/1/21‐12/14/21 9,049.05 9,049.05 ACH 138259 City of San Diego 12/17/2021 Prof Eng Svcs: FY19/20 Sewer Rehab Design Project 5,678.66 5,678.66 ACH Nov3‐Nov30 21 California Public Empl Retirement System 12/21/2021 Pers Retirement 11/3/21‐11/30/21 68,469.72 68,469.72 ACH Dec14 21 US Treasury 12/21/2021 Federal Taxes 12/14/21 25,868.96 25,868.96 ACH 76544217 WEX Bank 12/23/2021 Fuel ‐ Fire/PW ‐ Nov'21 2,648.44 2,648.44 ACH Dec28 21 Employment Development Department 12/30/2021 State Taxes 12/28/21 6,690.78 6,690.78 ACH Dec28 21 US Treasury 12/31/2021 Federal Taxes 12/28/21 23,615.44 23,615.44 ACH Dec15‐Dec28 21 Calpers Supplemental Income 457 Plan 12/31/2021 457 Plan 12/15/21‐12/28/21 9,049.05 9,049.05 ACH Dec21 Wage Works 12/31/2021 FSA Reimbursement ‐ Dec'21 2,905.83 2,905.83 ACH Jan 2022 Pers Health 01/04/2022 Pers Health Insurance ‐ Jan22 52,824.50 52,824.50 ACH Oct21 San Diego County Sheriff's Department 01/05/2022 Law Enforcement Services ‐ Oct'21 541,660.88 541,660.88 ACH Dec21 Sedgwick Claims Management Services, Inc. 01/05/2022 CLG Workers Comp Claims ‐ Dec'21 1,580.25 1,580.25 15147 7390 Aguirre & Associates 12/15/2021 Englewood Dr Dedication ‐ Oct'21 272.50 272.50 15148 L1072895VL American Messaging 12/15/2021 Pager Replacement Program 12/1/21‐12/31/21 50.61 50.61 15149 19918L‐IN Aztec Landscaping Inc 12/15/2021 Material ‐ Irrigation Repairs ‐ Various Locations 461.74 1,301.74 19918L‐IN Landscaping Labor ‐ Irrigation Repairs ‐ Various Locations 840.00 15150 5277286 Bearcom Group Inc. 12/15/2021 Portable Radios Monthly Contract 10/22/21‐11/21/21 150.00 300.00 5292639 Portable Radios Monthly Contract 11/22/21‐12/21/21 150.00 15151 48692 Boot World Inc 12/15/2021 Work Boots ‐ PW 155.86 208.63 48692 Return/Work Boots ‐ PW ‐179.38
49294 Work Boots ‐ PW 125.00
51652 Work Boots ‐ PW 107.15
15152 Jan 2022 California Dental Network Inc 12/15/2021 California Dental Insurance ‐Jan'22 206.06 206.06 15153 0000015902 City of El Cajon 12/15/2021 Overtime Reimbursement ‐ Cameron 11/13/21 1,319.28 1,319.28 15154 1000314741 City of San Diego 12/15/2021 Metro Industrial Wastewater Control Program/Pretreatmt‐ FY2021 390.00 6,072.16 1000314742 Metro Industrial Wastewater Control Program‐ FY2021 110.00 1000317016 Fuel Services‐PW: Oct'21 3,005.16
1000318211 Fuel Services‐PW: Nov'21 2,567.00
15155 2849 Clark Telecom & Electric Inc. 12/15/2021 Street Light Dig‐Alert Markouts ‐ Oct'21 266.58 883.31 2872 Street Light Repairs‐ Oct'21 616.73
15156 3842 Clothing International, Inc 12/15/2021 Protective Clothing ‐ PW ‐ Caps 464.96 464.96 15157 014098 Cloud Security Systems 12/15/2021 Service/Security Sys/2873 Skyline/PW Yard 11/1/21‐10/31/22 300.00 300.00 15158 202100831 County of San Diego/Assessor/Recorder/Clerk 12/15/2021 Recording Services‐ 10/27/21 118.00 118.00 15159 6867 D‐ Max Engineering Inc 12/15/2021 1993 Dain Dr Inspection 9/1/21‐9/30/21 157.08 1,747.36 6868 Vista Azul Inspection 9/1/21‐9/30/21 355.10
6869 8016 Broadway Inspection 9/1/21‐9/30/21 326.90
6949 1993 Dain Dr Inspection 10/1/21‐10/31/21 252.54
6950 Golden Doors Inspection 10/1/21‐10/31/21 24.50
6951 Vista Azul Inspection 10/1/21‐10/31/21 405.70
6952 8016 Broadway Inspection 10/1/21‐10/31/21 225.54
15160 310 Diviana's Party Rentals 12/15/2021 Canopy/Stage‐ Bonfire 12/3/21 123.91 123.91 15161 1207219905 Domestic Uniform Rental 12/15/2021 Shop Towels & Safety Mats 12/7/21 37.00 37.00 15162 11/15‐18/21 Esgil Corporation 12/15/2021 75% Building Fees‐ 11/15/21‐11/18/21 6,664.88 22,032.96 11/29‐30/21 75% Building Fees‐ 11/29/21‐11/30/21 1,990.19 12/1‐2/21 75% Building Fees‐ 12/1/21‐12/2/21 1,830.41
7/6‐8/21 75% Building Fees‐ 7/6/21‐7/8/21 5,168.19
9/27‐30/21 75% Building Fees‐ 9/27/21‐9/30/21 6,379.29
15163 738936011 Hawthorne Machinery Co 12/15/2021 Equip Rental ‐ Light Tower ‐ Bonfire 126.73 1,847.61 73893602 Equip Rental ‐ Light Towers ‐ Bonfire 1,720.88 15164 00098874 Hudson Safe‐T‐ Lite Rentals 12/15/2021 Senior Center Traffic Sign 70.36 2,144.11 00098878 Traffic Signs 216.50
00098879 Barricades/Supplies for Traffic Signs 1,629.92 00098881 Supplies for Traffic Signs 227.33
15165 12/14/21 ICMA 12/15/2021 ICMA Deferred Compensation Pay Period Ending 12/14/21 780.77 780.77 15166 14130 Infrastructure Engineering Corporation 12/15/2021 Prof Svc: Vista Azul 8/28/21‐9/24/21 1,036.00 2,324.00 14131 Prof Svc: Proj# 2021‐15 FY21 Paving/CM/Inspectn 8/28/21‐9/24/21 1,288.00 15167 202110 Lemon Grove Car Wash, Inc. 12/15/2021 Smog ‐ LGPW#28 '08 Chevy Colorado ‐ 10/25/21 59.75 169.81 202110 Smog ‐ LGPW#22 '03 GMC ‐ 10/25/21 59.75
202110 Oil Change ‐ LGPW#31 '14 Ford Escape ‐ 10/25/21 50.31 15168 0165265‐IN Municipal Maintenance Equipment Inc 12/15/2021 Replaced Hydraulic Pump/Drive Line/Bushing ‐ LGPW#24 Vac Con 4,073.04 4,073.04 15169 INV985 NexTech Systems, Inc. 12/15/2021 16' Galvanized Steel Pole ‐ Knockdown @ Golden Ave & School Ln 2,023.24 2,023.24 15170 PD‐49723 Plumbers Depot Inc 12/15/2021 Sewer Camera‐ Repair Camera Wheels ‐ LGPW#26 2,117.81 2,117.81 15171 85009 Rick Engineering Company 12/15/2021 Prof Svc: City Engineer 10/30/21‐11/26/21 29,406.76 29,406.76 15172 Nov21 SDG&E 12/15/2021 Gas & Electric 10/22/21‐11/19/21 23,393.55 23,393.55 15173 CLG‐33 Smith Air Conditioning 12/15/2021 Service Call ‐ AC Unit Repair‐ Sheriff 2,550.00 2,550.00 15174 81276 Southwest Signal Service 12/15/2021 Bi‐Monthly Traffic Signal Maintenance ‐ Oct'21 991.65 17,421.84 81277 Markout Reports ‐ Underground Service Alert ‐ Oct'21 162.72 81278 Traffic Signal Service Calls ‐ Oct'21 3,211.57
81335 Traffic Signal Service Calls ‐ Nov'21 7,401.53
81336 Bi‐Monthly Traffic Signal Maintenance ‐ Nov'21 991.65 81337 Markout Reports ‐ Underground Service Alert ‐ Nov'21 162.72 81338 Install Solar Ped Xing‐ Nov'21 4,500.00
15175 119073061‐0001 Sunbelt Rentals Inc. 12/15/2021 Rental ‐ Scissor Lift ‐ Senior Center 770.92 791.66 119763565‐0001 Propane 11.31
120017316‐0001 Propane 9.43
15176 12811 T‐Man Traffic Supply 12/15/2021 Speed Limit Sign/Parking Signs 195.11 195.11 15177 662460 Telsco Industries, Inc. 12/15/2021 One Year Service Plan Plus Warranty (Irrigation) ‐ 8 Locations 680.00 680.00 15178 dsb20205448 Underground Service Alert of SC 12/15/2021 State Fee/Regulatory Monthly Costs/Dig Alert 2020 35.71 71.42 dsb20205994 State Fee/Regulatory Monthly Costs/Dig Alert 2020 35.71 15179 1020210385 Underground Service Alert/SC 12/15/2021 48 New Ticket Charges ‐ Oct'21 89.20 183.35 1120210387 51 New Ticket Charges ‐ Nov'21 94.15
15180 73124735 Vulcan Materials Company 12/15/2021 Asphalt 104.42 210.80 73131460 Asphalt 106.38
15181 0001444472‐IN WEX Health, Inc. 12/15/2021 COBRA ‐ Monthly/Nov'21 85.00 85.00 15182 138259 City of San Diego 12/15/2021 Prof Eng Svcs: FY19/20 Sewer Rehab Design Proj 5,677.16 5,677.16 15183 7422 Aguirre & Associates 12/21/2021 Hibisus Dr Dedication ‐ Nov'21 272.50 817.50 7423 Central Ave Dedication ‐ Nov'21 272.50
7424 New Jersey Ave Dedication ‐ Nov'21 272.50
15184 1VQG‐MMPT‐G4VV Amazon Capital Services, Inc. 12/21/2021 Battery Charger & Maintainer ‐ Fire Prev Vehicle 80.70 80.70 15185 0037622‐IN Aztec Landscaping Inc 12/21/2021 Landscape Mgmt Svc ‐ Oct'21 3,671.49 3,671.49 15186 13766 Balestreri, Potocki & Holmes 12/21/2021 Legal Svcs: File 1019‐224 ‐ thru Oct'21 9,712.19 9,712.19 15187 INV01489 City of Imperial Beach 12/21/2021 SD Bay Watershed WQIP Cost Share Agreement‐ FY21/22 8,711.00 8,711.00 15188 50132 Colantuono, Highsmith & Whatley, PC 12/21/2021 Legal Svcs: Affordable Housing Nov'21 293.88 293.88 15189 202100895 County of San Diego/Assessor/Recorder/Clerk 12/21/2021 Recording Services‐ 11/1/21 & 11/29/21 95.00 95.00 15190 6807 D‐ Max Engineering Inc 12/21/2021 LG Mt Vernon SWQMP Review 7/16/21‐8/21/21 812.00 812.00 15191 166042 MJC Construction 12/21/2021 Installation of Concrete Sidewalk‐Berry St Park Phase II 33,523.20 74,034.00 166043 Demolition of 121 LF of Sound Wall ‐ Pub Works Yard 40,510.80 15192 73687903 Occupational Health Centers of CA 12/21/2021 Medical Exam ‐ 12/3/21 54.50 54.50 15193 154266PS Pacific Sweeping 12/21/2021 Street Sweeping/Parking Lot, Power Washing/Bus Shelters ‐ Sep'21 6,428.55 19,285.65 154404PS Street Sweeping/Parking Lot, Power Washing/Bus Shelters ‐ Oct'21 6,428.55 154540PS Street Sweeping/Parking Lot, Power Washing/Bus Shelters ‐ Nov'21 6,428.55 15194 INV‐004742 SBRK Finance Holdings, Inc. 12/21/2021 Prof Svcs: Financial Software Proj Mgmt 11/2/21 179.00 179.00 15195 STMT 11/22/2021 US Bank Corporate Payment Systems 12/21/2021 Valve Rebuild Kit/Wiper Blades/Fuel Cap 187.01 5,746.99 Uniforms ‐ Boot Order Change/Postage 41.43
Fire Station Supplies 97.36
Lodging/Transp/CalPELRA/Labor Rel Trng/James 11/16‐11/20 1,088.27 Homeless Outreach Cards for Trash 400.00
Union Tribune Subscription 116.00
Refreshments ‐ City Council Team Building 11/12/21 313.10 Job Postings/Fin Mgr/Sani Supervisor 951.36
Tools ‐ PW/Graffiti Truck LGPW#23 34.45
Bonfire Supplies 12/3/21 1,708.99
Fuel 30.03
Service/Security Sys/2873 Skyline/PW Yard 96.00
Registration/LCC 2021 City Clerk New Law Seminar/Malone 300.00 LCC Registration/City Clerk Course ‐ Malone 105.00
Virtual Time App ‐ City Mtgs 19.99
Driver Operator IA Training‐ Ortiz 10/25‐29/21 258.00
15196 80525083 Waxie Sanitary Supply 12/21/2021 Janitorial Supplies 1,095.79 1,095.79 15197 Jan‐Jun 22 Adams Robert 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 915.18 915.18 15198 Jan22‐Jun22 Anderson, Curtis 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15199 12/12/2021 AT&T 01/05/2022 Phone Service 11/13/21‐12/12/21 91.64 91.64 15200 13898 Balestreri, Potocki & Holmes 01/05/2022 Legal Svcs: File 1019‐224 ‐ thru 11/30/21 18,322.00 18,322.00 15201 Jan22‐Jun22 Brackmann, Bruce 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 915.18 915.18 15202 B210743 Bright Planet Solar 01/05/2022 Refund/Bright Planet Solar/B21‐0743 901.62 901.62 15203 278121‐Nov21 Burke, William, & Sorensen, LLP 01/05/2022 08250‐0001 General Nov'21 16,667.50 43,019.44 278122‐Nov21 08250‐0002 Code Enf Nov'21 99.60
278123‐Nov21 08250‐0008 Nov'21 17,596.64
278124‐Nov21 08250‐0011.001 Nov'21 132.80
278125‐Nov21 08250‐0011.002 Nov'21 5,930.80
278126‐Nov21 08250‐0011.003 Nov'21 33.20
278127‐Nov21 08250‐0002.002 Nov'21 1,747.30
278128‐Nov21 08250‐0002.003 Nov'21 811.60
15204 Jan22‐Jun22 Chamberlain, Dale 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15205 2021.3883 Chen Ryan 01/05/2022 Prof Svc: Connect Main St Ph 3 thru 11/27/21 1,390.00 7,212.50 2021.3884 Prof Svc: Connect Main St Ph 1‐2 thru 11/27/21 5,822.50 15206 0000015922 City of El Cajon 01/05/2022 Overtime Reimbursement ‐ Kelsen 12/2/21 1,386.11 3,961.10 0000015922 Overtime Reimbursement ‐ Lopez 11/27/21 1,255.71 0000015922 Overtime Reimbursement ‐ Pearson 12/9/21 1,319.28 15207 22CTOFLGN05 County of San Diego‐ RCS 01/05/2022 800 MHZ Network ‐ Nov'21 4,503.00 4,503.00 15208 01022220560 DAR Contractors 01/05/2022 Animal Disposal‐ Dec'21 174.00 174.00 15209 Jan22‐Jun22 Davisson, William 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15210 12/6‐9/21 Esgil Corporation 01/05/2022 75% Building Fees‐ 12/6/21‐12/9/21 73,451.60 73,451.60 15211 IN293662 Geotab USA, Inc. 01/05/2022 Monthly ProPlus Plan 197.50 197.50 15212 Jan22‐Jun22 Harper, Raymond 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 915.18 915.18 15213 120921‐04 Heartland Fire Training Facility 01/05/2022 Firefighter Course LARRO‐ 11/17‐11/19/21 Greatorex‐Maldonado 390.00 1,426.00 120921‐12 Firefighter Course RS‐1‐ 12/6‐12/10/21 Ortiz/Ledford 1,036.00 15214 10/21/21‐12/21/21 Helix Water District 01/05/2022 Water Services‐ 10/21/21‐12/21/21 23,126.25 23,126.25 15215 HS‐5607‐0012 Home Start, Inc. 01/05/2022 LG Homeless Outreach ‐ Nov'21 2,612.62 2,612.62 15216 65629 Horrocks Engineers Inc 01/05/2022 Prof Eng Svcs: FY19/20 Sewer Rehab Proj thru 11/30/21 8,963.50 8,963.50 15217 12/28/21 ICMA 01/05/2022 ICMA Deferred Compensation Pay Period Ending 12/28/21 780.77 780.77 15218 14304 Infrastructure Engineering Corporation 01/05/2022 Prof Svc: 1993 Dain Dr 10/30/21‐11/26/21 148.00 11,406.00 14305 Prof Svc: 8016 Broadway Self Storage 10/30/21‐11/26/21 148.00 14306 Prof Svc: FY21 Paving/CM/Inspectn 10/30/21‐11/26/21 11,110.00 15219 1717 Janazz, LLC SD 01/05/2022 IT Services‐ City Hall‐ Nov'21 2,500.00 2,500.00 15220 Jimenez Jimenez, David 01/05/2022 Refund/Jimenez,David/Diversion Dep/B20‐0305/1642 San Altos Pl 500.00 500.00 15221 Jan22‐Jun22 Laff, Timothy 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15222 Jan22‐Jun22 Maciejewski, Frank 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15223 Jan22‐Jun22 Marcon, Romeo 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15224 Jan22‐Jun22 McBride, Thomas 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15225 PB2814 McCain 01/05/2022 Prof Svc: Traffic Signal 3,800.00 3,800.00 15226 73778193 Occupational Health Centers of CA, A Medical Cor 01/05/2022 Medical Exam ‐ 12/8/21 103.00 678.50 73778193 Medical Exam ‐ 12/8/21 38.50
73778193 Medical Exam ‐ 12/9/21 179.00
73778193 Medical Exam ‐ 12/13/21 179.00
73778193 Medical Exam ‐ 12/14/21 179.00
15227 Jan22‐Jun22 Ott, Manie 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 915.18 915.18 15228 Jan22‐Jun22 Ott, Mike 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 915.18 915.18 15229 1180 Pacific Design & Integration, Inc. 01/05/2022 Installation & Testing/RDL Audio Mixer/Audio System ‐ Comm Ctr 1,490.00 1,490.00 15230 10438‐01 PAL General Engineering, Inc. 01/05/2022 FY21 Street Rehab Proj #2021‐15 11/15/21‐12/15/21 428,327.26 428,327.26 15231 INV00041888 RapidScale Inc. 01/05/2022 Virtual Hosting/Back Up Svc/Cloud Storage/Svr 12/31/21‐1/30/22 4,340.78 4,340.78 15232 234933 Richards, Watson & Gershon 01/05/2022 Legal Svcs: 12506‐0003 thru 11/30/21 4,769.88 4,769.88 15233 Jan22‐Jun22 Schmidtmann, Warren 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15234 12/21/2021 SDG&E 01/05/2022 3225 Olive‐ 11/20/21‐12/21/21 150.84 399.97 12/23/2021 3500 1/2 Main‐ 11/20/21‐12/21/21 206.16
12/23/2021 3601 1/2 LGA‐11/20/21‐12/21/21 42.97
15235 Jan22‐Jun22 Smith, Timothy 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15236 Dec 14 Southern CA Firefighters Benefit Trust 01/05/2022 LG Firefighters Benefit Trust 12/14/21 876.85 4,384.25 Dec 28 LG Firefighters Benefit Trust 12/28/21 876.85
Nov 16 LG Firefighters Benefit Trust 11/16/21 876.85
Nov 2 LG Firefighters Benefit Trust 11/2/21 876.85
Nov 30 LG Firefighters Benefit Trust 11/30/21 876.85
15237 8064392688 Staples Advantage 01/05/2022 Office Supplies & Copy Paper ‐ City Hall 639.87 639.87 15238 Jan22‐Jun22 Taff, Jon 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 1,200.00 1,200.00 15239 1221077 The Pin Center 01/05/2022 Lanyards with Logo 454.50 454.50 15240 Jan22‐Jun22 Wright, Nancy 01/05/2022 Retiree Health Benefit ‐ Jan'22‐Jun'22 915.18 915.18 2,226,466.49 2,226,466.49
Accept the Public Works Yard Wall
Replacement Project as Complete
January 18, 2022
Page | 1
CITY OF LEMON GROVE
CITY COUNCIL
STAFF REPORT
Item No. 1. C
Meeting Date: January 18, 2022
Submitted to: Honorable Mayor and Members of the City Council Department: Public Works Department
Staff Contact: Michael Stauffer, Senior Management Analyst [email protected]
Mike James, Assistant City Manager / Public Works Director [email protected]
Item Title: Accept the Public Works Yard Wall Replacement Project as Complete (Contract No. 2021-20)
Recommended Action: Adopt a resolution (Attachment A) accepting the Public Works Yard Wall Replacement Project as complete (Contract No. 2021-20).
Summary: The City Council awarded the Public Works Yard Wall Replacement Project to MJC Construction on September 21, 2021, not to exceed a total project budget of $55,000. The project consisted of demolition of a stucco perimeter wall and replacing it with concrete masonry block. Staff completed its final inspection of the improvements and determined that the work was completed per the contract specifications. The total cost of the project was $45,012.
Discussion: On September 21, 2021, MJC Construction was awarded the Public Works Yard Wall Replacement Project (Contract No. 2021-20) with a total contract amount of $55,000. The project consisted of removing an existing 121 linear foot stucco perimeter wall and replacing it with concrete masonry block. The wall provides for security and safety of the public works facility and staff. There were no changes to the project during construction. The project was completed on time (26 working days) and on budget.
Accept the Public Works Yard Wall
Replacement Project as Complete
January 18, 2022
Page | 2
Completed Wall
Staff recommends that the City Council adopt a resolution (Attachment A) accepting the work as complete, authorize the City Manager or her designee to file a Notice of Completion with the County of San Diego Recorders Office, and authorize staff to release the retention no sooner than thirty (30) days after the Notice of Completion has been filed.
Environmental Review:
Not subject to review Negative Declaration
Categorical Exemption, Section Mitigated Negative Declaration Fiscal Impact: Funding in the amount of $55,000 was budgeted in the current fiscal year from Account Number 01-50-14-7020. The final project cost was $45,012.
Accept the Public Works Yard Wall
Replacement Project as Complete
January 18, 2022
Page | 3
Public Notification: None.
Staff Recommendation: Adopt a resolution (Attachment A) accepting the Public Works Yard Wall Replacement Project as complete (Contract No. 2021-20).
Attachment:
Attachment A – Resolution
Accept the Public Works Yard Wall
Replacement Project as Complete
January 18, 2022
Page | 4
Attachment A
RESOLUTION NO. 2022 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LEMON GROVE,
CALIFORNIA, ACCEPTING THE PUBLIC WORKS YARD WALL
REPLACEMENT PROJECT AS COMPLETE (CONTRACT NO. 2021-20)
WHEREAS, on September 21, 2021, the City Council awarded the Public Works Yard Wall Replacement Project to MJC Construction (Contract No. 2021-20); and WHEREAS, the contract bid amount was established at $45,012; and WHEREAS, the project budget included a $9,988 contingency for a total project budget of $55,000; and
WHEREAS, the final project cost was allocated for this project from (01) General Fund; and
WHEREAS, on November 17, 2021, MJ Construction completed the scope of work as defined by the original contract; and
WHEREAS, City staff inspected all of the improvements and determined that MJC Construction fulfilled its contractual obligations.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lemon Grove, California hereby:
1. Accepts the work for the Public Works Yard Wall Replacement Project as complete (Contract No. 2021-20); and
2. Authorizes the City Manager or her designee to file a notice of completion with the County of San Diego; and
3. Authorizes city staff to release the retention no sooner than thirty (30) days after the notice of completion is filed.
Accept the Public Works Yard Wall
Replacement Project as Complete
January 18, 2022
Page | 5
Attachment A
PASSED AND ADOPTED on January 18, 2022, the City Council of the City of Lemon Grove, California, adopted Resolution No. _______, passed by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
__________________________
Racquel Vasquez, Mayor
Attest:
__________________________
Audrey Malone, City Clerk
Approved as to Form:
_________________________
Kristen Steinke, City Attorney
Accept the Berry Street Park Walking
Path Project as Complete
January 18, 2022
Page | 1
CITY OF LEMON GROVE
CITY COUNCIL
STAFF REPORT
Item No. 1. D
Meeting Date: January 18, 2022
Submitted to: Honorable Mayor and Members of the City Council Department: Public Works Department
Staff Contact: Michael Stauffer, Senior Management Analyst [email protected]
Mike James, Assistant City Manager / Public Works Director [email protected]
Item Title: Accept the Berry Street Park Walking Path Extension Project as Complete (Contract No. 2021-21)
Recommended Action: Adopt a resolution (Attachment A) accepting the Berry Street Park Walking Path Extension Project as complete (Contract No. 2021-21).
Summary: The City Council awarded the Berry Street Park Walking Path Extension Project to MJC Construction on October 5, 2021, not to exceed a total project budget of $40,000. The project consisted of extending the existing concrete walking path approximately 776 linear feet around the park site. Staff completed its final inspection of the improvements and determined that the work was completed per the contract specifications. The total cost of the project was $37,248.
Discussion: On October 5, 2021, MJC Construction was awarded the Berry Street Park Walking Path Extension Project (Contract No. 2021-21) with a total contract amount of $40,000. The project consisted of removing an existing decomposed granite path and replacing it with concrete. The path extended the existing concrete, resulting in a walking loop around the park site. There were no changes to the project during construction. The project was completed on time (10 working days) and on budget.
Accept the Berry Street Park Walking
Path Project as Complete
January 18, 2022
Page | 2
Completed Walking Path
Accept the Berry Street Park Walking
Path Project as Complete
January 18, 2022
Page | 3
Staff recommends that the City Council adopt a resolution (Attachment A) accepting the work as complete, authorize the City Manager or her designee to file a Notice of Completion with the County of San Diego Recorders Office, and authorize staff to release the retention no sooner than thirty (30) days after the Notice of Completion has been filed.
Environmental Review:
Not subject to review Negative Declaration
Categorical Exemption, Section Mitigated Negative Declaration Fiscal Impact: Funding in the amount of $40,000 is budgeted in the current fiscal year from Account Numbers 01-50-14-7080 and 05-00-00-7082. The final project cost was $37,248.
Public Notification: None.
Staff Recommendation: That the City Council adopt a resolution (Attachment A) accepting the Berry Street Park Walking Path Extension Project (Contract No. 2021-21) as complete.
Attachment:
Attachment A – Resolution
Accept the Berry Street Park Walking
Path Project as Complete
January 18, 2022
Page | 4
Attachment A
RESOLUTION NO. 2022 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LEMON GROVE,
CALIFORNIA, ACCEPTING THE BERRY STREET PARK WALKING PATH EXTENSION PROJECT AS COMPLETE (CONTRACT NO. 2021-21)
WHEREAS, on October 5, 2021, the City Council awarded the Berry Street Park Walking Path Extension Project to MJC Construction (Contract No. 2021-21); and WHEREAS, the contract bid amount was established at $37,248; and WHEREAS, the project budget include a $2,752 contingency for a total project budget of $40,000; and
WHEREAS, the final project cost was allocated for this project from (01) General and (05) Park Land Dedication funds; and
WHEREAS, on November 17, 2021, MJ Construction completed the scope of work as defined by the original contract; and
WHEREAS, City staff inspected all of the improvements and determined that MJC Construction fulfilled its contractual obligations.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lemon Grove, California hereby:
1. Accepts the work for the Berry Street Park Walking Path Extension Project as complete (Contract No. 2021-21); and
2. Authorizes the City Manager or her designee to file a notice of completion with the County of San Diego; and
3. Authorizes city staff to release the retention no sooner than thirty (30) days after the notice of completion is filed.
Accept the Berry Street Park Walking
Path Project as Complete
January 18, 2022
Page | 5
Attachment A
PASSED AND ADOPTED on January 18, 2022, the City Council of the City of Lemon Grove, California, adopted Resolution No. _______, passed by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
__________________________
Racquel Vasquez, Mayor
Attest:
__________________________
Audrey Malone, City Clerk
Approved as to Form:
_________________________
Kristen Steinke, City Attorney
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 1
LEMON GROVE CITY COUNCIL
CITY COUNCIL
STAFF REPORT
Item No. 2.
Meeting Date: January 18, 2022
Submitted to: Honorable Mayor and Members of the City Council Department: Public Works Department
Staff Contact: Mike James, Assistant City Manager / Public Works Director [email protected]
Item Title: Approve a Memorandum of Understanding with San Diego Metropolitan Transit System for Bus Shelter and
Bench Advertising
Recommended Action: Adopt a resolution (Attachment A) approving a memorandum of understanding with San Diego Metropolitan Transit System for Bus Shelter and Bench Advertising.
Summary: This fiscal year the City Council directed staff to identify opportunities to reduce trash and increase cleanliness citywide. This agenda item presents an opportunity to partner with San Diego Metropolitan Transit System (MTS) to assume ownership and maintenance of all bus shelters and benches in the City. If approved, this partnership will delegate all trash duties, graffiti mitigation, and structural maintenance of all bus shelters and benches in the City to MTS. This will allow city staff’s time, materials, and resources to be allocated to other priorities.
The background and discussion sections below will provide a historic summary of past reports that were presented to the City Council, list the benefits and drawbacks of approving the memorandum of understanding (MOU) with MTS, elaborate further on details of the agreement, and conclude with staff’s recommendation to approve the MOU and estimate next steps moving forward.
Background: Since 2013, staff has presented three reports to the City Council, that discussed bus shelters or benches in the City. Each of those dates are listed below with the discussion points and any direction provided to staff from the City Council. • April 16, 2013 (Attachment B) – Staff asked for the City Council’s feedback regarding its interest in entering into a MOU with MTS to partner in its advertising and maintenance program. Staff presented a comparison of the benefits and drawbacks of a potential partnership as well as specific topics that staff requested from the City Council to provide feedback about. Those topics included: receive revenue from advertisements by MTS, focus on bus shelters first SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 2
and then benches, how many shelters and benches will be impacted, is solar lighting included, and what are the terms of the agreement.
The City Council directed staff to learn more about the MTS bus shelter and bench advertising program. Specifically, the City Council was interested in learning more about maintenance response types and times, primary customers that advertise on bus shelters and bus benches, advertisement protocol, and fiscal impacts to the City if a partnership is pursued.
• May 21, 2013 (Attachment C) – Staff returned with a report that detailed responses to each of the questions posed by the City Council in April 2013. a. Maintenance response types and times,
b. Primary customers that advertise on bus shelters and bus benches, c. Advertisement protocol, and
d. Fiscal impacts to the City if a partnership is pursued.
The report concluded with two options for the City Council to consider: First, partner with MTS to manage the bus shelters and benches in the City. Second, remove and replace the bus shelters and continue to maintain the bus shelters and benches with City forces.
• March 2, 2015 (Attachment D) – Staff returned with a report that requested to purchase ten bus shelters and remove and replace them with City contractor/forces. This staff report was prefaced with a June 2014 memorandum to the City Council (included in Attachment D) that summarized communications with MTS between May 2013 and June 2014, what a construction timeline would look like and staff’s recommendation to forego the partnership with MTS and move forward with the replacement project.
The entire duration of this project started in January 2013 and ended with the March 2015 decision for the City to move forward on its own to replace the bus shelters. Looking back to January 2013 the main reason that staff presented this project to the City Council was to save money by not having to maintain the bus shelters, reduce calls for service to clean graffiti and remove trash and debris, and eliminate liability if any incident were to occur at the bus shelter that could have resulted in a claim against the City.
Currently, the City manages the following bus stops with and without furniture listed below:
Description of Bus Furniture Quantity
Benches 18
Shelters 10
Stops 52
Trash Receptacles 19
Stops without Furniture 31
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 3
Discussion: City staff has maintained 10 bus shelters that were purchased and installed since 2015. As opportunities present themselves to streamline City operations, staff evaluates each opportunity to determine if it warrants further exploration. This staff report outlines the most recent opportunity which staff believes the City can reduce its maintenance costs and free up staff time by approving the MOU with MTS for bus shelter and bus bench advertising.
City staff currently spends three hours per week to maintain the bus shelters in the City.
That equals approximately $800 per month for staff, vehicles, materials, and equipment.
Additionally, twice per month each bus shelter is power washed by the City’s contractor that costs $1,800 per month.
The total maintenance costs per month equals approximately $3,892. If the MOU with MTS were approved all city maintenance costs will decrease to zero and MTS will be the responding party to all calls for service for maintenance and repair. This is the major benefits that the MOU would offer to the City, a savings of $46,704 annually A summary of all benefits and drawbacks of partnering with MTS through this MOU are detailed in the table below:
Expenditure Description City Expenses City Expenses with MTS Agreement
Personnel $755 $0
Equipment $329 $0
Materials $488 $0
Power Washing $2,320 $0
Total Monthly Expenditures $3,892 $0
Benefits Drawbacks
Transfers ownership of all bus shelters
and bus benches to MTS.
Advertisements may clutter the
appearance.
Relieves the City from maintaining the
Shelters.
May receive complaints about
advertisements.
Adds new modern shelters and
benches.
Allows for the City to repurpose its
TDA funds to improve the City streets
near bus stops.
Reduces the City’s liability by
transferring ownership to MTS.
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 4
Lastly, staff wanted to highlight topics that were raised for staff to follow up with additional information in the past as well as current activities that will be required if the MOU is approved. Staff has confirmed the accuracy of each topic with MTS staff.
1. Advertisement Protocol: MTS Board Policy No. 21
(https://sdmts.com/sites/default/files/policy.21.rev_generate_display_ad_con cessions_merchandise.pdf) outlines information about MTS’ advertising protocol. Section 21.2 states, “The subject matter for all advertising materials displayed on MTS property shall be limited to Commercial Speech.” Further it elaborates as to what is allowed as Commercial Speech in Sections 21.2.1 and
21.2.2 regarding MTS Operations Advertising that promotes MTS transit services programs or products and Public Service Advertisements from Local, State or Federal Government Agencies regarding public programs, public services, and public events. The MTS policy further identifies types of advertisement that are prohibited, such as:
• Personal attacks on an individual or group,
• Political or electoral advertisements,
• Portrayal of violence,
• Nudity, erotic or obscene advertisements,
• Alcohol, tobacco, or firearms advertisements, and
• Profanity.
A full list of non-permitted advertisements is identified in Section 21.3 of the MTS policy.
2. Removal and Replacement of the Existing Furniture: The 10 existing bus shelters will be replaced by MTS contractors. Further, MTS committed to installing new bus benches at the 18 other stops. The City will be required to disassemble and remove the 10 bus shelters prior to MTS contractors installing the new shelters.
3. MTS Graffiti Response Time: All forms of graffiti will be cleaned by MTS’ contractor, including etching. The MTS contractor is required to respond within 48 hours of notice.
The MOU outlines several other terms that are detailed below:
• Term: 10 years with exclusive rights assigned to SDMTS. • Advertising: Transit shelters and bus benches with advertising shall be permitted only in commercial, industrial or multifamily housing areas in the City unless otherwise authorized by the City Manager. Per Board Policy No. 21 digital advertisements are authorized.
• Maintenance: SDMTS will provide all ongoing maintenance for every transit shelter or bench which was installed by SDMTS. Shelters and benches shall be repaired or replaced within 48 hours of notification to MTS of any damage, vandalism, or graffiti found.
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 5
• Termination of MOU: The City may terminate this MOU if SDMTS or its contractor materially breaches the terms or conditions with no payment to SDMTS or its contractor. If the City terminates without cause, with 365-day notice, the City shall pay MTS the current value for every transit shelter or bus bench installed. MTS may terminate this MOU without cause, with 365-day notice, and negotiate with the City to take possession and ownership of the shelters and bus benches or remove each and restore the sidewalk to a safe and usable condition.
If the MOU is approved, City staff anticipates the following tasks will be completed with the associated timeline.
Staff recommends that the City Council approve the MOU with MTS for Bus Shelter and Bus Bench Advertising. The benefit of partnering with MTS, notwithstanding what was already discussed, frees up Public Works staff to no longer allocate time and resources to cleaning the bus shelters each week. That time and resources can now be dedicated to other activities necessary to accomplish the City Council priority tasks moving forward.
Environmental Review:
Not subject to review Negative Declaration
Categorical Exemption, Section Mitigated Negative Declaration Fiscal Impact: None.
Staff Recommendation: Adopt a resolution (Attachment A) approving a memorandum of understanding with San Diego Metropolitan Transit System for Bus Shelter and Bench Advertising.
Attachments:
Attachment A – Resolution
Attachment B – April 16, 2013 Citywide Bus Shelter and Bench Partnership opportunity
Attachment C – May 21, 2013 Citywide Bus Shelter and Bench Program Attachment D – March 3, 2015 Bus Shelter Purchase
Tasks Tentative Dates
Return Signed MOU to SDMTS January 2022
MOU Finalized March 2022
Begin work April - May 2022
Complete work Fall 2022
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 6
Attachment A
RESOLUTION NO. 2022 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LEMON GROVE,
APPROVING A MEMORANDUM OF UNDERSTANDING WITH SAN DIEGO
METROPOLITAN TRANSIT SYSTEM FOR BUS SHELTER AND BENCH
ADVERTISING
WHEREAS, the City owns and maintains multiple bus furnishes that are located at San Diego Metropolitan Transit System stops throughout the City; and WHEREAS, in 2015, the City Council directed staff to replace 10 aged and deteriorated bus shelters; and
WHEREAS, staff evaluated current bus shelter maintenance activities and estimated an overall benefit may be realized if the City partners with the San Diego Metropolitan Transit System to assume ownership of all bus shelters and bus benches through a memorandum of understanding for bus shelter and bus bench advertising; and WHEREAS, San Diego Metropolitan Transit System will replace and maintain 10 bus shelters and 18 bus benches; and
WHEREAS, the City Council finds it in the public interest to approve a memorandum of understanding with the San Diego Metropolitan Transit System for bus shelter and bus bench advertising.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lemon Grove, California, hereby:
1. Approves a memorandum of understanding (Exhibit 1) with San Diego Metropolitan Transit System for Bus Shelter and Bench Advertising; and
2. Establishes an initial 10-year term through June 30, 2032. After June 30, 2032, the MOU shall continue on a year-over-year basis unless terminated by the City or SDMTS; and
3. Authorizes the City Manager or her designee to execute the agreement and manage all memorandum of understanding requirements.
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 7
PASSED AND ADOPTED on January 18, 2022, the City Council of the City of Lemon Grove, California, adopted Resolution No. 2022-_______, passed by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
__________________________
Racquel Vasquez, Mayor
Attest:
__________________________
Audrey Malone, City Clerk
Approved as to Form:
_________________________
Kristen Steinke, City Attorney
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 8
Exhibit 1
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 9
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 10
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 11
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 12
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 13
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 14
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 15
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 16
Attachment B
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 17
Attachment C
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 18
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 19
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 20
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 21
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 22
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 23
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 24
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 25
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 26
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 27
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 28
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 29
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 30
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 31
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 32
Attachment D
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 33
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 34
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 35
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 36
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 37
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 38
SDMTS Bus Shelter and Bench Advertising
January 18, 2022
Page | 39
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 1
LEMON GROVE SANITATION
DISTRICT
DISTRICT BOARD
STAFF REPORT
Item No.
Meeting Date:
Submitted to:
Department:
Staff Contact:
Item Title:
3. January 18, 2022
Honorable Chair and Members of the District Board
Public Works Department
Mike James, Assistant City Manager / Public Works Director [email protected]
Mike Stauffer, Senior Management Analyst
[email protected]
Award an Agreement with Rick Engineering Company to
Design the Fiscal Year 2020-2021 and Fiscal Year 2021-
2022 Sewer Replacement and Maintenance Project
(Contract No. 2021-24)
Recommended Action: Adopt a resolution (Attachment A) awarding an agreement with Rick Engineering Company to design the Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Replacement and Maintenance Project (Contract No. 2021-24).
Summary: The City’s Five-Year Capital Improvement Program (CIP) identifies street, sanitation, traffic, drainage, parks and facilities projects for design and/or construction each year. In line with that program, District staff focuses its resources to accomplish each project as listed in the CIP. This current fiscal year, one project was identified to consolidate two years of sanitation district sewer rehabilitation which is called the Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Rehabilitation and Maintenance Project. District staff advertised a request for proposals with the District’s short list of pre-qualified firms and concluded that Rick Engineering Company was the most qualified and best firm to design and oversee the construction of this project moving forward. The staff report will further describe the details about the project, the selection process, and concludes with staff’s recommendation to award a professional services agreement to Rick Engineering Company (Rick Engineering).
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 2
Discussion: The Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Rehabilitation and Maintenance Project (Project) was identified as a priority project in the 2017 Sanitary Sewer Master Plan to repair and/or replace because of the pipe age and accessibility to maintain. The project consists of eight (8) locations that are highlighted below:
1. CIP #2: Miscellaneous Manhole Repairs;
2. CIP #5: Mt. Vernon to Shirley Lane Lining;
3. CIP #8: Broadway South Repair;
4. CIP #11: Skyline at Mt. Vernon Repair;
5. CIP #13: Baldwin, Roy, Kempf Repair;
6. CIP #25: Cinderella Place Replacement;
7. CIP #26: Taft Street Replacement; and
8. CIP #27: Mt. Vernon St. Replacement.
This project will include developing engineering plans, design specifications and cost estimates (PS&E) and related construction documents. The scope of work also requested bid and construction support.
Consultant Selection Process: On October 26, 2021, the District advertised a request for proposals (RFP) to its short list of three pre-qualified firms to assist the City/District with services and/or support of the Five Year Capital Improvement Program. On November 10, 2021, two firms submitted proposals in response to the RFP. Those two firms were Dokken Engineering and Rick Engineering Company (Rick Engineering). The third firm notified the District that it would not be able to provide a proposal due to timing and workload.
The RFP included criteria that the selection committee used to evaluate each proposal.
That criteria included: proposal conforms to format/key issues discussed, project manager/team member capabilities, ability to meet project deadlines, scope of work and budget. The final average scoring summary that the selection committee agreed upon is shown in the table below:
Consultant
Criteria
Total Format Team Deadlines Scope Cost
Rick Engineering
Company
14.5 25.375 19 28.25 8.481 94.60655
Dokken Engineering 14 22.125 19.5 26.25 9 90.875
While the final scoring average was close between the two firms, staff concluded that Rick Engineering’s preexisting District knowledge and experience of the project team as it related to sewer projects in the County made Rick Engineering a more responsive firm to work on project.
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 3
Recommendation: The selection committee concluded that the best consultant team to perform the scope of work based upon the above listed criteria was Rick Engineering.
Rick Engineering has worked with the District on past projects and demonstrated that it has the experience and technical competence to perform the work that the District is asking for now. Additionally, the proposed methodology to complete the work involves a significant level of communication that staff feels very comfortable working with the project team to address the specific needs at each of the eight locations.
The selection committee also reviewed the cost estimate that was included with each responsive proposal. It believes the cost estimate submitted by Rick Engineering of $331,949 is reasonable. Further, the cost estimate equals ~15% of the estimated construction cost estimate of $2.1 million, which is within industry standards. Staff created the following table to show a project cost estimate to perform all work associated with this project for the Board’s consideration.
As with most project work that involves the District sewer system, there are sewer main lines that exist in private property. In these instances, staff will always attempt to design the lines out of private property into public right-of-way if reasonable. But, in most instances that is not feasible and therefore the ongoing maintenance and repair of the line has to be performed where the line exists. It is important to note in the project cost estimate (shown above) there is an added line-item titled additive/alternative work that is proposed by Rick Engineering. That work is summarized below. • Task 2.1 Additive Alternative – Pre-Construction Corner Records Prepare and process up to twenty-eight (28) pre-construction corner records for monuments that occur within sewer improvement limit of work or construction area per Section 8771 of the Professional Land Surveyor's Act.
TOTAL: $54,000
• Task 2.1 (c) Additive Alternative – Additional Boundary Survey/Right-of-Way Prepare boundary survey, partial boundary survey, and/or computed right-ofway for CIP projects in which the sewer improvement limit of work crosses property or right-of-way lines, occurs on private property, and/or whose property (based on available GIS records). From review of proposed locations boundary survey, partial boundary survey, or computed right-of-way is presumed required for CIP-5, 8, 25, and CIP-2b, 2c, 2d, 2j and 2k. The District shall provide Title Reports.
Cost Description Amount
Based Scope of Work $331,949
Additive/Alternate Work $176,745
Sub-Total $508,694
Contingency (5%) $25,306
Project Total $534,000
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 4
» CIP-5 Partial Boundary survey/ROW: $17,580
» CIP-8 Partial boundary survey/ROW: $7,260
» CIP-13: Provided in base scope
» CIP-25: Partial Boundary survey/ROW: $6,080
» CIP-2b: Right-of-way/Caltrans: $6,060
» CIP-2c: Partial Boundary survey: $5,520
» CIP-2d: Right-of-way/Caltrans: $5,000
» CIP-2g: Provided in base scope
» CIP-2j : Partial Boundary/ROW: $6,080
» CIP-2k: Partial Boundary/ROW: $6,080
» CIP-2l: Provided in base scope
TOTAL: $65,195
• Task 2.5 Additive/Alternative - Legal descriptions and Exhibits From preliminary GIS research, it is anticipated that Sewer Project CIP-13 may have up to six (6) potential properties that contain existing public sewer but may not have an existing sewer easement. Similarly, according to available GIS data, CIP-2 (locations 2g and 2l) identify existing public manholes located on private properties, up to 5 potential properties, without existing sewer easements in place to allow for District maintenance access. Prepare sewer easement plats and legal descriptions for up to eleven (11) assumed affected properties, at a cost of $1,750 per legal and plat (up to $19,250).
TOTAL: $19,250
• Task 3.7 Additive/Alternative Miscellaneous Environmental Compliance with applicable environmental regulations will be a requirement of the project regardless of the anticipated NOE. Due to the presence of trees, shrubs, and other potential bird nesting habitat, Helix Environmental Planning (a subconsultant to Rick Engineering) has included this optional task to assist the City with compliance with the Migratory Bird Treaty Act (MBTA) and California Fish and Game Code (CFG Code). If the planned replacement and maintenance activities must occur during the general bird nesting season (February 1st to August 31st) and would require removal or other disturbance to bird nesting habitat, pre-activity nesting bird surveys would be recommended to help ensure compliance with the MBTA and CFG Code. This optional task includes up to three (3) pre-activity nesting bird surveys and brief memoranda to document compliance. If additional surveys, documentation, or other services are requested by the City, those service could be provided under a contract amendment.
TOTAL: $5,900
• Task 4.2.2 Additive/Alternative Traffic Control
Provide data collection and prepare separate Traffic Control Plan sheets for the proposed improvements to be submitted and review with the Sewer CIP Improvement Plans for review. The following provides the anticipated sheets and stages for each CIP project:
» CIP-2h West Street north of Broadway. One (1) sheet for one (1) stage is anticipated.
» CIP-2i North Avenue at Buena Vista Avenue. One (1) sheet for one (1) stage is anticipated.
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 5
» CIP-2k Washington Street at Iderdell Lane. One (1) sheet for one (1) stage is anticipated.
» CIP-5 Mount Vernon Street and Madera Street. One (1) sheet for one (1) stage (Mount Vernon Street) is anticipated. One (1) sheet for one (1) stage (Madera Street) is anticipated.
» CIP-8 Broadway in the vicinity of Buena Vista Avenue. Three (3) sheets for six (6) stages of work are anticipated.
» CIP-11 along Mount Vernon Street and Skyline Drive in the vicinity of project. Seven (7) sheets for six (6) stages are anticipated. » CIP-13 Kempf Street in the vicinity of Roy Street. Two (2) sheets for two (2) stages are anticipated.
TOTAL: $32,400
Staff believes that the total project cost estimate of $534,000 is very conservative and will likely not all be needed to complete this project design. However, it is important to plan for a base design project as well as include all conceivable additive/alternative work items that may be encountered. By identifying the work items now, it will allow District and Rick Engineering staff to maintain a consistent and steady workflow to complete design of the project as soon as possible. If approved, staff envisions that the design work will begin in February 2022 and will be completed in Summer 2022, with the construction bid advertisement following shortly thereafter. The bid advertisement, contractor selection, contract award and construction will continue through Winter of 2023.
Environmental Review:
Not subject to review Negative Declaration
Categorical Exemption, Section Mitigated Negative Declaration Fiscal Impact: $300,000 was programmed in current fiscal year budget Account Number 16-00-00-7264. If the full project cost estimate is approved, staff requests that the District Board allocate an additional $234,000 from the undesignated balance of the Sanitation District Operations Fund to fund the project design costs.
Staff Recommendation: Adopt a resolution (Attachment A) awarding an agreement with Rick Engineering Company to design the Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Replacement and Maintenance Project (Contract No. 2021- 24).
Attachments:
Attachment A – Resolution
Attachment B – Professional Services Agreement
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 6
Attachment A
RESOLUTION NO. 2022 -
A RESOLUTION OF THE DISTRICT BOARD OF THE LEMON GROVE
SANITATION DISTRICT, AWARDING AN AGREEMENT WITH RICK
ENGINEERING COMPANY TO DESIGN THE FISCAL YEAR 2020-2021 AND FISCAL YEAR 2021-2022 SEWER REHABILITATION AND MAINTENANCE PROJECT (CONTRACT NO. 2021-24)
WHEREAS, the District Board plans and budgets its annual capital improvement project list based on the Five-Year Capital Improvement Program (CIP) that was approved with the Fiscal Year 2021-2022 Consolidate Budget document; and WHEREAS, District staff focuses its resources on designing and constructing the next programmed projects that are listed in the CIP; and WHEREAS, based on the District Sanitary Sewer Master Plan Update and the CIP, the District anticipates several projects that are required to continue operating and maintaining the Districts Sanitary Sewer System; and
WHEREAS, the District relies on the expertise of a professional engineering consulting firm that possesses expertise to design and provide construction support for this type of sewer project; and
WHEREAS, the District solicited requests for proposals to design a two year sewer rehabilitation and maintenance project and on November 10, 2021 two proposals were received; and
WHEREAS, District staff evaluated the proposals and determined Rick Engineering Company was the best-suited professional engineering consulting firm to complete this project; and
WHEREAS, the District Board finds it in the public interest to approve a professional services agreement Rick Engineering Company and a project budget not to exceed $534,000.
NOW, THEREFORE, BE IT RESOLVED that the District Board of the Lemon Grove Sanitation District, Lemon Grove, California, hereby:
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 7
1. Approves a professional services agreement (Exhibit 1) with Rick Engineering Company design the Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Rehabilitation and Maintenance Project (Contract No. 2021-24); and
2. Establishes a project budget not to exceed five hundred thirty-four thousand dollars and zero cents ($534,000.00); and
3. Transfers $234,000 from the undesignated balance in Fund 15 Sanitation District – Operating Budget to Fund 16 Sanitation District – Capital Account No. 16-00-00-7264 for the Fiscal Year 2020-2021 and Fiscal Year 2021-2022 Sewer Rehabilitation and Maintenance Project(Design)to fund the estimated project budget; and
4. Authorizes the Executive Director or her designee to execute the agreement and manage all project correspondence.
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 8
PASSED AND ADOPTED on January 18, 2022, the District Board of the Lemon Grove Sanitation District of Lemon Grove, California, adopted Resolution No. 2022-_______, passed by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
__________________________
Racquel Vasquez, Board Chair
Attest:
__________________________
Audrey Malone, District Clerk
Approved as to Form:
_________________________
Kristen Steinke, District Attorney
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 9
Attachment B
Exhibit 1
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 10
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 11
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 12
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 13
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 14
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 15
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 16
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 17
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 18
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 19
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 20
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 21
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 22
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 23
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 24
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 25
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 26
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 27
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 28
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 29
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 30
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 31
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 32
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 33
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 34
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 35
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 36
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 37
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 38
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 39
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 40
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 41
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 42
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 43
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 44
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 45
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 46
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 47
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 48
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 49
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 50
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 51
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 52
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 53
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 54
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 55
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 56
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 57
FY 20-21 and FY 21-22 Sewer Rehab Project
January 18, 2022
Page | 58
Appointment of City Council Member to
Committees, Commissions, and Boards
January 18, 2022
Page | 1
CITY OF LEMON GROVE
CITY COUNCIL
STAFF REPORT
Item No. 4.
Meeting Date: January 18, 2022
Submitted to: Honorable Mayor and Members of the City Council Department: Mayor’s Office
Staff Contact: Racquel Vasquez, Mayor
Item Title: Appointment of City Council Member to Committees, Commissions, and Boards
Recommended Action: Ratify the Mayor’s Committees, Commissions and Boards assignments for City Council Members.
Background and Discussion: Each year the Mayor makes appointments to various outside Commissions, Committees and Boards. Appointees represent the City of Lemon Grove on these regional bodies.
The 2022 Commission, Committee and Board Mayoral appointments are listed on Attachment A in this report. This attachment also indicates which Regional Commissions, Committees or Boards offer a stipend for meeting attendance.
Environmental Review:
Not subject to review Negative Declaration
Categorical Exemption, Section Mitigated Negative Declaration Fiscal Impact: None
Public Notification: None
Staff Recommendation: Ratify the Mayor’s Committees, Commissions and Boards assignments for City Council Members for the 2022 calendar year.
Attachment:
Attachment A – 2022 Commissions, Boards & Committees Appointments
LEMON GROVE CITY COUNCIL
2022 COMMISSIONS, BOARDS & COMMITTEES APPOINTMENTS
Commission/Board/Committee Meeting Location/Contact Information Designated Seats
Council
Appointment
DRAFT 01-18-2022 Page 1
City/School District
Collaboration Committee
Quarterly Meetings
(schedule determined each year)
Lemon Grove School District
(Board Room)
8025 Lincoln, Lemon Grove, CA 91945
(619) 825-3800
Council
Seats (2)
Vasquez
Mendoza
East County Economic Development
Council (ECEDC)
3rd Wednesday @ 7:30am
ECEDC
1908 Friendship Drive
El Cajon, CA 92020 (619) 258-3670
Council Seat
Alternate
Gastil
Jones
Heartland Communications
Facility Authority (HCFA)
Quarterly—January, April, July, October
4th Thursday @ 4:00pm
*$100.00 Stipend for meeting attendance
Ronald Reagan Community Center
195 East Douglas, El Cajon, CA 92020
Valerie Nellis (619) 441-1623
[email protected]
Council Seat
Alternate
Mendoza
LeBaron
Heartland Fire Training
Facility Authority (HFTFA)
Quarterly—2nd Thursday @ 4:00pm
*$100.00 Stipend for meeting attendance
Heartland Fire Training Facility
1301 N. Marshall, El Cajon, CA 92020
Dave Miller, (619) 441-1693
[email protected]
Council Seat
Alternate
Mendoza
LeBaron
Helix Water District
Water Representative & liaison
Sandy Janzan –Board Secretary
(619) 466-0585
[email protected]
Council Seat
Alternate
LeBaron
Gastil
League of California Cities
Executive Committee Luncheon mtg.
Monthly—2nd Monday @ 11:30am
(no meeting April, July, October)
Four Points Sheraton
8110 Aero Drive, San Diego, CA 92123
Catherine Hill, Regional Representative
(619) 295-8282
Council Seat
Alternate
Mendoza
Vasquez
League of California Cities
Conference Voting Delegate As appointed Council Seat
As
determined
prior to
conference
LEMON GROVE CITY COUNCIL
2022 COMMISSIONS, BOARDS & COMMITTEES APPOINTMENTS
Commission/Board/Committee Meeting Location/Contact Information Designated Seats
Council
Appointment
DRAFT 01-18-2022 Page 2
Metro Commission /
Metro Wastewater JPA
Monthly—1st Thursday @ Noon
*$150.00 Stipend for meeting attendance
MWWD MOC II Auditorium
9192 Topaz Way, San Diego, CA 92123
Lori Peoples (619) 548-2934
[email protected]
Council Seat
Alternate
Jones
Mendoza
Metropolitan Transit System (MTS)
Usually 2nd or 3rd Thurs @ 9:00am
*$150.00 Stipend for meeting attendance
MTS
1255 Imperial Ave. #1000
San Diego, CA 92101-7490
(10th floor board room)
Julia Tuer (619) 557-4515
[email protected]
Council Seat
Alternate
Gastil
Mendoza
SANDAG Board of Directors
2nd Friday—Policy @ 10:15am
4th Friday—Board @ 9:00am*
*dark in August
*Stipend for meeting attendance
$150.00 for Board Meetings
$100.00 for Committee Meetings
SANDAG
401 B Street
(7th Floor Board Room)
San Diego, CA 92101
Francesca Webb, Clerk of the Board
Council Seat
Alternate
2nd Alternate
Vasquez
Mendoza
Gastil
Sweetwater Rivershed Advisory
Panel
2 times per year
TBA Council Seat
Alternate
Mendoza
LeBaron
San Diego East County
Chamber of Commerce Liaison
East County Chamber
201 S Magnolia Ave
El Cajon, CA 92020
Council Seat
Alternate
Gastil
LeBaron
San Diego Area Wastewater
Management District
Once Yearly —Announced
MWWD MOC II Auditorium
9192 Topaz Way, San Diego, CA 92123
Lori Peoples (619) 548-2934
[email protected]
Council Seat Jones
California Joint Powers Insurance
Authority (CJPIA)
Board of Directors
Annual Board Meeting
Meets in July
*$100.00 Stipend for meeting attendance
California Joint Powers Insurance
Authority
8081 Moody Street
La Palma, CA 90623
Council Seat
Alternate
Mendoza
James (Risk
Manager)
Lemon Grove Regular
City Council Meeting
PLEASE MUTE ALL DEVICES
Meeting is recorded for the purpose of drafting meeting minutes.
Audio of the meeting is uploaded to the City website
within 72 hours following meeting.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
CHANGES TO THE AGENDA
PUBLIC COMMENT
ALL SPEAKERS RELATING TO PUBLIC COMMENT WILL HAVE 3 MINUTES TO ADDRESS COUNCIL • Please fill out and submit a speaker slip to the
City Clerk BEFORE the item on the agenda has
been heard at the City Council Meeting to
address the Council.
• Speaker Slips are located at the entrance of
the Chambers.
1. CONSENT CALENDAR
2. REPORTS TO COUNCIL
Approve a Memorandum of Understanding
with San Diego Metropolitan Transit System for
Bus Shelter and Bench Advertising
Presented by: Mike James, Assistant City Manager /
Public Works Director
Bus Shelter and Bench Advertising
January 18, 2022
Background
April 2013 May 2013 March 2015
Bus Stop Inventory
Shelters, 9
Benches, 11
Trash
Receptacles, 6
No Furniture, 31
SHELTERS
BENCHES
TRASH RECEPTACLES
NO FURNITURE
0 5 10 15 20 25 30 35
Bus Shelter and
Bench Citywide Map
•Bus Routes
• 856
• 916
• 917
• 936
•Trolley
• Orange Line
Monthly Maintenance Costs - $3,892/Month
Personnel - $755
• Two (2) Public Works Technicians
• Twice Per Week for 90 minutes
Equipment - $329
• Vehicle
• Electric Fogging Machine
• Trash Pickers
Materials - $488
• Trash Bags
• Cleaning Solution
Power Washing - $2,320
• Contractor Services
Benefits and Drawbacks of the MOU
Terms of the
MOU
• 10 years
• Termination Clause
• Advertise
MOU
• Shelter
• Bench
Furniture
• Repair & Maintenance
48 hour notice
Questions?
January 18, 2022
RECOMMENDATION:
Adopt a resolution approving a memorandum
of understanding with San Diego Metropolitan
Transit System for Bus Shelter and Bench
Advertising.
PUBLIC COMMENT
ALL SPEAKERS RELATING TO PUBLIC COMMENT WILL HAVE 3 MINUTES TO ADDRESS COUNCIL • Please fill out and submit a speaker slip to the
City Clerk BEFORE the item on the agenda has
been heard at the City Council Meeting to
address the Council.
• Speaker Slips are located at the entrance of
the Chambers.
3. REPORTS TO BOARD
Award an Agreement with Rick Engineering
Company to Design the Fiscal Year 2020-2021
and Fiscal Year 2021-2022 Sewer Replacement
and Maintenance Project (Contract No. 2021-
24)
Presented by: Mike James,
Assistant City Manager/Public Works Director
DESIGN AGREEMENT FY 20-21/FY 21-22
SEWER REPLACEMENT AND
MAINTENANCE PROJECT
◦ City’s Five-Year Capital Improvement Program (CIP)
◦ 2017 Sanitary Sewer Master Plan Update
◦ Consultant selection process advertised to the City’s list of pre-qualified firms ◦ Selected Rick Engineering Company based on the following criteria:
◦ Proposal conforms to format/key issues,
◦ Project manager/team member capabilities,
◦ Ability to meet project deadlines,
◦ Scope of work, and
◦ Budget
Project
Locations
Project Budget
◦ 8 tasks in the scope of work
◦ 5 additive/alternate tasks
◦Base scope of work is 15.8%
of $2.1M construction cost
estimate
Cost Description Amount
Based Scope of Work $331,949
Additive / Alternate Work $176,745
Sub-Total $508,694
Contingency (5%) $25,306
Project Budget Total $534,000
RECOMMENDATION:
Adopt a resolution awarding an agreement
with Rick Engineering Company to design the
Fiscal Year 2020-2021 and Fiscal Year 2021-2022
Sewer Replacement and Maintenance Project
(Contract No. 2021-24).
PUBLIC COMMENT
ALL SPEAKERS RELATING TO PUBLIC COMMENT WILL HAVE 3 MINUTES TO ADDRESS COUNCIL • Please fill out and submit a speaker slip to the
City Clerk BEFORE the item on the agenda has
been heard at the City Council Meeting to
address the Council.
• Speaker Slips are located at the entrance of
the Chambers.
4. REPORTS TO COUNCIL
Appointment of City Council Member to
Committees, Commissions, and Boards
Presented by: Racquel Vasquez, Mayor
RECOMMENDATION:
Ratify the Mayor’s Committees, Commissions
and Boards assignments for City Council
Members.
PUBLIC COMMENT
ALL SPEAKERS RELATING TO PUBLIC COMMENT WILL HAVE 3 MINUTES TO ADDRESS COUNCIL • Please fill out and submit a speaker slip to the
City Clerk BEFORE the item on the agenda has
been heard at the City Council Meeting to
address the Council.
• Speaker Slips are located at the entrance of
the Chambers.
CITY COUNCIL REPORTS ON
MEETINGS ATTENDED AT THE
EXPENSE OF THE CITY
CITY MANAGER REPORT
a. CONFERENCE WITH LEGAL COUNSEL –
EXISTING LITIGATION
Government Code § 54956.9(a)
Name of Case: City of Lemon Grove v. NV5,
Inc. et al. (SDSC Case No.: 37-2020-
00022512-CU-CO-CTL)
CLOSED SESSION:
ADJOURNMENT
From: Barbara Gordon
To: Raquel Vasquez; Jennifer Mendoza; Jerry Jones; [email protected]; George Gastil; Audrey Malone Subject: Public Comment
Date: Tuesday, January 18, 2022 12:55:23 PM
Dear City Council Members,
I work with young people and I’m concerned with their marijuana use. The youth’s attitude is often that weed is no big deal...lots of people smoke pot. It’s no more dangerous than taking your first sip of beer or wine.
I want to share with you two national surveys of US adolescents. The National Youth Tobacco Survey and Monitoring the Future estimated lifetime prevalence of marijuana use among grade 12 students as 15.6% and 28.3%, respectively.
Both studies found that marijuana vaping among adolescents has increased and has become a major public health concern for adolescents because of potential adverse respiratory, psychological, and social impacts. Marijuana addiction is real, and it hurts everyone, especially young people.
Not even the pandemic could stop marijuana use rates from rising among adolescents.
This data is extremely concerning and should act as a wake-up call for policymakers and the general public. With the normalization and commercialization of marijuana businesses the results are adolescents have more access to high potency THC products.
Public health and prevention measures are urgently needed to mitigate the increasing prevalence of marijuana use among our youth.
Thank you,
Barbara Gordon
From:
To: Raquel Vasquez; Jennifer Mendoza; Jerry Jones; [email protected]; George Gastil Cc: Audrey Malone
Subject: NON AGENDA PUBLIC COMMENTS for inclusion in the records Date: Tuesday, January 18, 2022 4:03:55 PM
Good Evening,
As a mother to children in their thirties and forties, as well as a public health educator, I am well aware of the unfortunate health outcomes, especially mental health issues that marijuana use causes for young adults.
Research now has linked cannabis use to the risk of a heart attack in adults ages 25-45. Those who have consumed marijuana more than 4 times in the last month have had almost double the amount of myocardial infarctions compared to those who were not users. The reasons for the connection could be related to higher heart rates and blood pressures attributed to cannabis use, as well as the high potency of the products today.
Dr. Sharif Mohr, an epidemiologist, holds a Master’s in Public Health and also received his PhD from our own UCSD. He remarked "There is a common misperception that any level of marijuana use is safe. However, the marijuana being used today is much more potent than what was encountered in the bygone hippy era."
The study also noted that marijuana use is contributing to a "burgeoning public health crisis that is only getting started and will get much worse unless lawmakers act quickly to rein in this newest addition to the for profit addiction industry".
Please remember Lemon Grove residents don’t need access to marijuana, it is everywhere. However good health is precious and the City should only involve themselves in those business activities that will enhance good health.
Diane Grace
From: Judi Strang
To: Raquel Vasquez; Jennifer Mendoza; Jerry Jones; [email protected]; George Gastil Cc: Audrey Malone
Subject: FOR PUBLIC COMMENT TONIGHT > impact that marijuana storefronts has on youth, promoting and normalizing its use, is inestimable
Date: Tuesday, January 18, 2022 2:56:32 PM
Dear City Council members, I am writing to you again as a parent advocate to draw your attention to the concern we have regarding what we see with our students’ mental health needs.
Recently KPBS feature reported that at Rady Children's Hospital, officials are reporting a 25% increase in mental health visits to their emergency room.
Willough Jenkins, a child psychiatrist and the inpatient medical director at Rady's reported that “Even before the pandemic mental health was in a crisis for youth — our numbers have been going up every single year so I don’t see this going down. Rady's has a 24-bed inpatient mental health unit which has been full. During the pandemic, a new psychiatric emergency room, called the Copley Psychiatric Emergency Department was opened.”
For those who are on the front line of students mental health, parents, PTA leaders, teachers, we need to underscore the role that marijuana plays in exacerbating mental health problems.
The impact that marijuana storefronts has on youth, promoting and normalizing its use, is inestimable. Remember that it is these marijuana storefronts that are the source of large billboards on I-5 & I-15, the sponsor of the slick postcards to citizens indicating their bargains for the week, and sell branded merchandise that students from the local high schools are wearing to class. The last situation has been created by the marijuana storefronts unapologetically named Cookies in La Mesa.
Regards, Judi Strang,
Health Committee, Ninth District PTA
County Office of Education
From: Judi Strang
December 07, 2021 8:44 PM
To: '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]> Cc: 'Audrey Malone' <[email protected]>
Subject: public health advisory on the mental health challenges confronting youth.
Good evening.
Judi Strang here, mother, grandmother, advocate for parents.
The lead story in the LA times yesterday was U.S. Surgeon General Vivek H. Murthy public health advisory on the mental health challenges confronting youth.
This is a rare warning and call to action to address what he called an emerging crisis exacerbated by pandemic hardships.
Symptoms of depression and anxiety have doubled during the pandemic, with 25% of youth experiencing depressive symptoms and 20% experiencing anxiety symptoms, according to Murthy’s 53-page advisory.
In early 2021, emergency department visits in the United States for suspected suicide attempts were 51% higher for adolescent girls and 4% higher for adolescent boys compared to the same time period in early 2019, according to research cited in the advisory.
Murthy wrote in a preface to the advisory. “Mental health challenges in children, adolescents, and young adults are real, and they are widespread.
Especially students with disabilities and students of color from low-income families.
The 53 page Surgeon General’s Advisory calls on those who surround young people and shape their day-to-day lives—schools, health care systems, media, and government back the mental health proposals for children and youth.
The City’s marijuana storefronts can have an unfortunate impact on children, by promoting and normalizing marijuana use as solution for stress and anxiety..
The only people who want marijuana businesses in Lemon Grove are those who benefit financially from the sale of this drug where high concentrates of THC are smoked and vaped, and contribute to poor physical and mental health.
Regards, Judi Strang, Parent Advocate
PTA Health advisory Committee
From: Kelly McCormick
To: Audrey Malone
Subject: Non-Agenda Public Comment, CC Mtg. 1.18.22
Date: Tuesday, January 18, 2022 3:12:07 PM
This is from Kelly McCormick. I am a public health educator with a focus on youth alcohol, tobacco and drug prevention.
I would like to share an important new position paper from the American Psychiatric Association. It says, in part, “Given the lack of scientific support for safe cannabis use, and the known adverse impacts and risk for addiction, the American Psychiatric Association opposes the use of cannabis by children, adolescents and young adults up to age 25.”
This statement is significant, as little is being done to educate the public about this risk. Pot use by those under 25 can cause anxiety, depression, and marijuanainduced psychosis. It is linked to higher rates of self-harm and suicide. The San Diego County Medical Examiner's office released data on people under 25 who took their own lives, and 39% tested positive for THC.
We must acknowledge that marijuana use contributes to the downward slide, and in some causes, is the direct cause
Of adolescents who enter County funded treatment facilities, 82% report marijuana as their primary drug of choice.
It's important to keep in mind that today's marijuana is far different from the "Woodstock weed" of the past. Today's top selling products are highly potent concentrates, with nearly pure THC. These concentrates have a dramatic impact on brain chemistry, particularly when used by young people.
If we truly care about making a difference in young people’s lives, and preventing mental health crises, it would be wise to focus on marijuana prevention strategies, rather than encouraging its use through normalization and an expanded industry footprint.
From: Jeremy Ogul
To: Audrey Malone
Subject: Public Comment - Item 2 - City Council - January 18, 2022 Date: Tuesday, January 18, 2022 12:11:14 PM
Dear members of the City Council,
I am writing to urge your support for the MOU with MTS for bus shelter and bench advertising.
However, I have one suggestion. The staff report does not make clear what happens to the existing City-owned bus shelters after they are removed to make way for the new MTS shelters.
The existing shelters were purchased and installed at a cost of $106,000 in 2015, and presumably are still in good condition. It would be wasteful for these shelters to be thrown away or kept in storage, unused.
If the City Council moves forward with the MOU with MTS, the City should ensure that this $106,000 purchase from 2015 continues to benefit users of the public transit system by preserving and re-using these shelters in one of the following ways:
Relocate them to other bus stops in Lemon Grove that currently do not have overhead shelter
Sell them to MTS or to another jurisdiction for use at bus stops nearby (La Mesa, City of San Diego, or unincorporated County)
Donate them to MTS or another local jurisdiction
Thank you for considering these options.
Sincerely,
Jeremy Ogul
Grove Street