TO: Lindsay City Council
FROM: Lisa Davis, Recreation Services Director
DEPARTMENT: Wellness/Aquatic/Recreation
ITEM NO.: 10.5
MEETING DATE: April 26, 2022

ACTION & RECOMMENDATION
Consider Minute Order Approval of Submittal of Streamlined Savings Pathway Program (SSP) Application and Proposal to Southern California Regional Energy Network (SoCalREN) for Energy Efficient Equipment for the Property Located at 860 North Sequoia Avenue, Lindsay, CA (APN: 201- 150-008-000) and Authorize City Manager to Execute Any Documents Thereto.

BACKGROUND | ANALYSIS
The City of Lindsay first enrolled with SoCalREN in 2020 to take advantage of the no-cost technical, financial, and project management services available to help the City of Lindsay move energy efficiency projects from conception to completion. After a site visit of the Lindsay Wellness Center was conducted, six (6) energy efficiency measures were identified; Pool Pump VFD, Interior Lighting Retrofits, Exterior Lighting Retrofits, Package Unit Replacement, Advanced Wifi Thermostat, and Vending Miser.

At the November 09, 2021, City Council regular meeting, Council authorized the City Manager to execute an agreement with SoCalREN and execute any documents thereto. SoCalREN is assisting the City of Lindsay with completing identified energy efficiency projects in an expedited manner, with an anticipated construction start date of September 2022.

SoCalREN’s new Streamlined Savings Pathway program (SSP) was introduced to the agency in March 2022. After receiving the predictability analysis results, SoCalREN consultants recommended that the city pursue the Streamlined Savings Pathway program, as it was seen as the best incentive option for the city.

Following approval by Council, the application will be reviewed, procurement would begin, and construction would be tentative to begin in September of 2022.

FISCAL IMPACT
Funding from Lindsay Hospital District for gross project cost is $323,882 dollars was approved on October 19, 2021, by their Board. The measures will save the City of Lindsay about 87,183 kWh/year, with an estimated savings per year of $22,422 dollars to the Lindsay Wellness Center Fund 400.

ATTACHMENTS
• SoCalREN SSP Project Proposal
• SoCalREN SSP Incentive Application

STAFF REPORT

Page 2 ends

• Lindsay Wellness Center Project Feasibility Study
• Lindsay Wellness Center Accelerated Replacement Customer Affidavit • SoCalREN Project Commitment Form
• October 19, 2021, Lindsay Local Hospital District Minutes Project Summary
The City of Lindsay first enrolled with SoCalREN in 2020 to take advantage of the no-cost services available to help the agency move energy efficiency projects from conception to completion. After a site visit of the Lindsay Wellness Center was conducted, SoCalREN discovered the facility is currently running 19.7% less efficient than the national GHG Emissions level median (Appendix A). On the site visit, six energy efficiency measures were identified: Pool Pump VFD, Interior Lighting Retrofits, Exterior Lighting Retrofits, Package Unit Replacement, Advanced Wifi Thermostat, and Vending Miser. The following proposal outlines the estimated cost associated with the six measures.

Benefits of this project include improving safety and reliability, increasing occupant comfort, reducing maintenance costs, hedging against increasing utility costs, and reducing greenhouse gas emissions by 70 metric tons annually, which equates to taking 15 cars off the road.

Estimated Savings
$2,040 per month
$24,479 per year
Estimated Net Savings (NPV)
$68,932
over project lifetime
Simple Payback Period

8.75 Years
Monthly and annual savings include energy and maintenance cost savings Project Financials
Project Costs
Gross Project Cost $215,151
Estimated SSP Incentives $7,099
Remaining Project Cost $208,052
Additional costs, such as construction management or staff time, are not included in this table. Incentive reimbursements are not received until after the project has been completed and approved by SoCalREN *Additional COVID markup budget was approved for contingency and is based on current high cost variance. This initial project cost estimate remains unchanged.

Project Financial Metrics
Net Present Value (NPV) - Cash Only $68,932
Simple Payback Period (SPP) 8.75
Return on Investment (ROI) 0.33
Financial metrics definitions can be found in Appendix B.

Up-front capital requirements are often the greatest obstacle in pursuing energy efficiency retrofit projects. There will be an out-of-pocket cost of $208,052.
1 Cash Flow Analysis
The SoCalREN provides expert guidance identifying financing opportunities available for public agencies and applying and securing them for eligible agencies. In the case that RSF is not available to the City of Lindsay, please use this cash flow chart outlined below.

Year
Incentives &
Financing
Est. Utility
Savings
Est.

Maintenance
Savings
Total Cash
Inflows
Est. RSF Loan
Payment
Total Cash
Outflows
Net Cash Flows
0 $7,099 $7,099 $0 ($215,151) ($208,052)
1 $0 $17,508 $6,270 $23,777 $0 $0 $23,777
2 $0 $17,686 $6,334 $24,020 $0 $0 $24,020
3 $17,867 $6,398 $24,265 $0 $0 $24,265
4 $18,049 $6,463 $24,512 $0 $0 $24,512
5 $18,233 $6,529 $24,762 $0 $0 $24,762
6 $10,368 $6,154 $16,523 $0 $0 $16,523
7 $10,474 $6,217 $16,691 $0 $0 $16,691
8 $10,581 $6,281 $16,862 $0 $0 $16,862
9 $10,689 $6,345 $17,034 $0 $0 $17,034
10 $10,798 $6,409 $17,207 $0 $0 $17,207
11 $10,908 $6,475 $17,383 $0 $0 $17,383
12 $11,019 $6,541 $17,560 $0 $0 $17,560
13 $5,713 $6,293 $12,006 $0 $0 $12,006
14 $5,771 $6,357 $12,129 $0 $0 $12,129
15 $5,830 $6,422 $12,252 $0 $0 $12,252
Total $7,099 $181,495 $95,488 $284,083 $0 ($215,151) $68,931 **all values are in Present Value
2 Energy Savings Measures
The energy efficiency measures found at the Lindsay Wellness Center include a pool pump VFD, interior lighting retrofits, exterior lighting retrofits, a package unit replacement, an advanced Wifi thermostat, and a vending miser. The measures will save the City of Lindsay about 87,183 kWh/year, equating to the city seeing an annual utility bill reduction of $22,422.

Measure #
Energy Efficiency
Measure
kWh Savings kW Savings
Electricity
Cost
Savings ($)
Gross
Project
Cost ($)
EEM 1 Pool Pump VFD 37,614 0 $6,399 $14,100
EEM 2
Interior Lighting
Retrofits 25,714 1.7 $4,876 $8,859
EEM 3
Exterior Lighting
Retrofits 739 0.9 $160 $692
EEM 4
Package Unit
Replacements 12,580 1.9 $7,775 $182,800
EEM 5
Advanced Wifi
Thermostats
(Optimum Start/Stop) 10,158 0 $3,148 $8,400
EEM 6 Vending Miser 378 0 $64 $300
TOTALS 87,183 4.5 $22,422 $215,151
Project Milestones and Activities
The Southern California Regional Energy Network (SoCalREN) will assist your agency with completing your energy efficiency projects in an expedited manner, with an anticipated construction start date of February 2022. Your Project Manager will work with you to refine these proposed dates and the project activities.

Milestone Date
Project Proposal Approval November, 2021
Project Commitment Form Signed April, 2022
Council/Board Approval Date April, 2022
Construction Start Date September, 2022
Appendix A: Energy Star Portfolio Manager (ESPM) Facility Snapshot 3 Metric Existing (Estimated) Post-EE (Projected) Target Weather Normalized Site Energy Use
Intensity (EUI) kBtu/sq. ft.
137 98
< National Median
(112)
Total GHG Emissions (Metric Tons
CO2e)
89 64
< National Median
(73)
Lindsay Wellness Center is currently 20.1% less efficient than the national median energy intensity for similar facilities.

Lindsay Wellness Center is currently 19.7% less efficient than the national median GHG Emissions level for similar facilities.

Appendix B: Financial Metrics Definitions
4 Gross Project Cost: the total of all construction costs for each measure including direct labor, materials, equipment, the contractor’s adjustment factor and all task order processing fees.

Net Present Value (NPV): NPV takes into account the time value of money and indicates what a project’s lifetime cash flow is worth today. NPV is determined by taking the sum of the present value of all current and future cash flows, including purchase and installation costs, and future utility and maintenance savings.

Reimbursable Costs: Money returned by the utilities after the project has been installed with the Installation Report submitted and approved.

Simple Payback Period (SPP): the amount of time required to recover the initial costs of a project from its savings. A simple payback period ignores the time value of money and assumes that future savings occur in even amounts each year. For example, a $1,000 investment that saves $500 each year has a two-year simple payback period. A project is economically acceptable if the payback period is less than the length of the project life.

SPP = Net Project Cost ($) / Annual Savings ($/yr)
Financing Assumptions
Discount Rate 2.95%
Utility Escalation Rate for 2021 4%
Utility Escalation Rate for 2022+ 4%
Inflation Rate 4%
Maintenance Savings
(% of Gross Project Cost)
3%
Project Lease Interest Rate 2.45%
Project Lease Interest Rate: The interest rate used is an indicative rate and does not represent an offer from SoCalREN or its partners. Actual borrowing rate will be determined when a project and financing is approved and will take in to account each agencies credit profile, needs, and financing terms and structure.

Estimates of potential Investor-Owned Utility (IOU) incentives and On-Bill Financing funding values are based on the most up-to-date information available from the corresponding utility. Utilities reserve the right to change and/or terminate funding for Energy Efficiency projects based on evolving priorities as determined by California Public Utilities Commission directives. These changes can happen without notice. Furthermore, errors in submitted documentation, delays in project implementation, and lack of adherence to utility program requirements can all impact the final IOU Incentive and On-Bill Financing values and approvals.
5 Agency Name Contact Name Title
Payee Name Payment Address City State Zip Code
Federal Tax ID/Employer ID Number (EIN) Payee Tax Status Tax Exempt Reason Project Manager Application Submittal Date
Project Coordinator(s)
Streamlined Savings Pathway Program Manager
CA 93247
City Manager
Angela Vaszily
Natalie Louis
Lindsay
Public Agency
Agency and Payment Information
SoCalREN Information
Michelle Bunn 4/27/2022
Presley Aviles
City of Lindsay 251 E. Honolulu Street
94-6000357 Tax-exempt/Non-profit
City of Lindsay Joseph Tanner
Facility Information
1 2
Facility Name Lindsay Wellness Center
Service Account Number 8002975386 (SCE)
Meter Number 259000-068943 (SCE)
Address 860 North Sequoia
City Lindsay
State CA
Zip Code 93247
Building Type Assembly
Year Built 2010
Square Footage 25,000
Facility kWh/year 328,946
Facility kW/year 94
Facility Therms/year 2,859
1 2 3 4 5 6
Measure Code TBD TBD TBD TBD TBD TBD
Delivery Type Custom Custom Custom Custom Custom Custom Measure Description Pool Pump VFD Interior Lighting Retrofits Exterior Lighting Retrofits Package Unit Replacements Advanced Wifi Thermostats (Optimum Start/Stop) Vending Miser
Facility Number 1 1 1 1 1 1
Pre-existing equipment Constant speed pool pump Metal Halide interior lighting Halogen and Flourescent exterior lighting
Package AC units, degraded
efficiency Non-programmable thermostats Package AC units, degraded efficiency Proposed equipment Variable speed pool pump LED interior lighting LED exterior lighting New package AC units, high efficiency
Advanced programmable wifi
thermostats
New package AC units, high
efficiency
Measure Application Type Add-on Equipment (AOE) Accelerated Replacement (AR) Accelerated Replacement (AR) Accelerated Replacement (AR) Accelerated Replacement (AR) Add-on Equipment (AOE) kWh Savings 37,614 25,714 739 12,580 10,158 378
kW Savings 0 2 1 2 0 0
Therms Savings 0 0 0 0 0 0
EUL 5 12 12 15 15 5
Lifetime GHG Emissions Savings
Annual Energy Cost Savings $6,399 $4,876 $160 $7,775 $3,148 $64 Gross Project Cost $14,100 $8,859 $692 $182,800 $8,400 $300 Incremental Project Cost $14,100 $8,859 $692 $182,800 $8,400 $300 Estimated Incentives $1,956 $2,653 $76 $1,369 $1,030 $15 Simple Payback 1.9 1.3 3.9 23.5 2.3 4.5
Measures Information
Document Uploader
CityofLindsay_W9.
pdf
Audit Commitment
Form
Acknowle
ACSpecProposed.pdf DIRECT-T5-VALUESELECT.pdf
HID-LOW-HIGH-BAYLAMP-FamilyDatasheet-R-1.pdf
PAR38HO-30W-DIM277V-Datasheet20210121.pdf
2022 Form 590
Withholding
Exemption

Lindsay Wellness
Center REN Audit
Workbook.xlsx
Wellness Center
Pool VFD 4-18-

22.xlsx
Mechanical
Calculations -
COVID
Lindsay Wellness
Center Incentive
Calculations.xlsm
LWC M&V Plan.docx
Lindsay WC SSP
Project Feasibility
Study 4.21.2022.pdf
Project Eligibility Project
kWh
Project
EUL
Simple
Payback
ELIGIBLE 87,183 9.7 4.9
Measure
Number Measure Code Measure Name
Energy
Savings
(kWh)
Expected
Useful Life
(EUL)
Simple
Payback
1 TBD Pool Pump VFD 37,614 5 1.9
2 TBD Interior Lighting Retrofits 25,714 12 1.3
3 TBD Exterior Lighting Retrofits 739 12 3.9
4 TBD Package Unit Replacements 12,580 15 23.5
5 TBD Advanced Wifi Thermostats (Optimum Start/Stop) 10,158 15 2.3 6 TBD Vending Miser 378 5 4.5
7 8
9 10
11 12
13 14
15 16
17 18
19 20
Expected Useful Life - Simple Payback Eligibility Tool
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
EUL - SPP Calculator TRUE
Application Checklist
Application Information
Facility Information
Measure Information
Project Feasibility Study
Calculations
M&V Plan
Spec Sheets
Audit Commitment Form
W-9
CA-590
4/27/2022 Date Submitted
5/11/2022 Internal Review Complete
5/12/2022 Submitted for Techncial Review
6/27/2022 Technical Review Complete
7/4/2022 CMPA Upload
Expected Application Timeline
SW Project Feasibility Study V1.0 Page 1 | 26
Project Feasibility Study
City of Lindsay - Lindsay Wellness Center
Whole Building Energy Efficiency Project
860 North Sequoia, Lindsay, CA 93247
Prepared by:
525 Technology Dr Ste 350
Irvine, CA 92618
Michelle Bunn, EcoDistricts AP
Email : [email protected] | Phone: 949-732-1099 Ext. 646 Customer Name Joseph Tanner
Position / Title City Manager
Signature
Date
By signing this document, you acknowledge that you have read and reviewed the attached energy efficiency Project Feasibility Study that SoCalREN has prepared.

Your signature does not bind you to completing or installing any of the measures described in this report.

The City of Lindsay understands that this project may be selected for an in-depth technical review by the Commission Staff (CS) of the State of California Public Utilities Commission (CPUC). If selected, the CS reserves the right to review the project and all associated documentation to ensure the proposed energy savings are reasonable and correct. Any proposed changes to the project’s energy savings or Energy Conservation Measures by CS must be implemented per the direction of the CS.

By signing above, you acknowledge that you understand that the energy savings described in this document are estimates only and are subject to change.

SoCalREN is not liable if the projected estimated savings or project economics differ from actual energy savings and/or project economics because of variations in operating conditions, changes in project scope, changes to implementation based upon CS recommendations or Industry Standard Practice study findings, changes based upon technical review findings, or for any other reason.

SW Project Feasibility Study V1.0 Page 2 | 26
Revision History
Rev Date Author & Organization Summary of Changes
01 3/31/22 Michelle Bunn, Project Manager, The
Energy Coalition - SoCalREN
Updated PFS to include Streamlined Savings Pathway
Program
SW Project Feasibility Study V1.0 Page 3 | 26
Table of Contents

1. Contact Information 4

2. Executive Summary 5

2.1 Project Eligibility 5

2.2 Project Drivers 5

2.3 E-5115 Requirements 11

3. Project Details 12

3.1 Facility Description 12

3.2 Energy Use Summary 12

3.3 Facility Equipment Inventory 133

4. Proposed Energy Efficient Measures (EEMs) 13

4.1: EEM 1 – Pool Pump VFD 13

4.2: EEM 2 – Interior Lighting Retrofits 14

4.3: EEM 3 – Exterior Lighting Retrofits 15

4.4: EEM 4 – Package Unit Replacements 16

4.5: EEM 5 – Advanced Wifi Thermostats (Optimum Start/Stop) 17

4.6: EEM 6 – Vending Miser 20

5. Project Cost & Financial Analysis 21

6. Measurement and Verification Plan 21

7. Project Parameters for Utility Energy Efficiency Programs 22

8. Appendix 25
SW Project Feasibility Study V1.0 Page 4 | 26

1. Contact Information

CUSTOMER INFORMATION
Customer Name
City of Lindsay
Utility Service Account No.
8002975386
Customer Contact
Joseph Tanner
Title
City Manager
Customer Address
251 E. Honolulu St.

City
Lindsay
State Zip
CA 93247
CA Climate Zone
13 Telephone
559-562-7102 ext.
8010
E-Mail
[email protected]

PROJECT INFORMATION
Project Name
Lindsay Wellness Center Whole Building
Project Site Address
860 North Sequoia
City
Lindsay
State Zip
CA 93247

PROGRAM CONTACTS
Project Manager
Michelle Bunn
SSP Program Manager
Angela Vaszily
SCE Account Representative
Frank Yanes
Telephone
949-732-1099 Ext. 646
Telephone
213-797-7815
Telephone
559-685-3276
E-Mail: [email protected] E-Mail:
[email protected] E-Mail: [email protected] SW Project Feasibility Study V1.0 Page 5 | 26

2. Executive Summary
This project was developed as a result of collaborative efforts between the City of Lindsay and the Southern California Regional Energy Network Public Agency Program (SoCalREN). The City of Lindsay enrolled with SoCalREN (SCR) in 2020 to take advantage of the no-cost services available to help the agency move energy efficiency projects from conception to completion. Based on the no-cost technical, financial, and project management services offered by SoCalREN, the City of Lindsay has chosen to move forward with this energy efficiency project.

Since the Lindsay Wellness Center is the City’s largest energy consumer, the facility was targeted in hopes of finding opportunities for energy efficiency. Six Energy Efficiency Measures (EEMs) were identified: 1) Pool Pump VFD, 2) Interior Lighting Retrofits, 3) Exterior Lighting Retrofits, 4) Package Unit Replacement, 5) Advanced Wifi Thermostats (Optimum Start/Stop), and 6) Vending Miser. These measures are estimated to see a reduction of 87,183 kWh annually, equating to the City seeing an annual utility bill reduction of $22,422. Additional benefits of this project include improving safety and reliability, increasing occupant comfort, reducing maintenance costs, hedging against increasing utility costs, and reducing greenhouse gas emissions by 70 metric tons annually, which equates to taking 15 cars off the road. The Lindsay Wellness Center continues to serve its local community and plans to expand its current programs and offerings to include more partnerships and courses with the local school district and youth camps and programming.

2.1 Project Eligibility
● Does the customer pay PPP charges? ☒Yes ☐ No
● Does the customer have cogeneration? ☒ Yes ☐ No
o Renewable energy ☒ Yes ☐ No
o Other non-utility generation ☒ Yes ☐ No
o Does the customer have another form of generation? ☐ Yes ☒ No o If yes, describe the cogeneration system, and complete & supply a grid impact calculation and explain how it delivers power to the equipment/system.
● Discuss any load shifting strategies are being employed No load shifting strategies are being employed.
● Discuss if the customer is participating in any Demand Response Programs The customer is not participating in any Demand Response Programs.

2.2 Project Drivers

1. When and how was the original communication with the customer initiated by the IOU/implementer/developer? o Describe when and how the Customer was made aware of the program’s features and measures for this project.
i. In February 2020, The City of Lindsay was made aware of SoCalREN’s program capabilities when they enrolled in the SoCalREN Public Agency Program (Attachment A: City of Lindsay Signed Enrollment Form, 2.11.20). SoCalREN presented a Comparative Energy Analysis report (CEA) to the agency on June 1, 2020 and the Lindsay Wellness Center (LWC) was identified as the highest consuming facility and was therefore prioritized for moving forward with energy efficiency (EE) projects. Later that week, SoCalREN sent a follow-up email to the city outlining the presentation’s key takeaways and next steps (Attachment B: CEA Follow-up email, 6.5.20). The Comparative Energy Analysis document was revised on June 18, 2020 based on feedback from the agency. (Attachment C: City of Lindsay CEA, 6.18.20).

SW Project Feasibility Study V1.0 Page 6 | 26
ii. With the City of Lindsay showing interest in exploring energy efficiency opportunities at the Wellness Center, a SoCalREN contracted engineer from TRC and SoCalREN conducted a site visit in August 2020. TRC identified initial measures at the facility and SoCalREN presented an Initial Measures List (IML) (Attachment D: LWC IML, 12.2.20) as well as an Agency Services Plan (ASP) on December 2, 2020 (Attachment E: LWC ASP, 12.2.20). An updated version of the Initial Measures List was presented to the agency on April 15, 2021 with relevant project costs in preparation for a project budget request (Attachment F: LWC Updated IML, 4.15.20). o Has customer thought about potential upgrades, do they know the approximate cost to do so? Are they aware of potential utility incentives? Are they aware of the benefits (EE and non-energy)? i. A follow up of the Initial Measures List presentation included the discussed preliminary savings, costs, and project pathway eligibility including standard IOU incentives, the SoCal Edison Performance-Based Retrofit Program, and SoCalREN’s Metered Savings Program (MSP) in addition to highlighting various Distributed Energy Resource (DER) measures (Attachment G: IML Followup email, pages 1-2, 12.9.20). Additionally, a Distributed Energy Resources audit report (also known as a Pathway to Zero report) was later prepared by SoCalREN and was provided to the city on December 16, 2021 (Attachment H: City of Lindsay DER Audit Report, 12.16.21). The Distributed Energy Resources audit report outlined potential projects the city could consider the following year as well as a copy of the Distributed Energy Resources calculations. ii. SoCalREN’s new Streamlined Savings Pathway program (SSP) was introduced to the agency in March 2022. After receiving the predictability analysis results, SoCalREN consultants recommended that the city pursue the Streamlined Savings Pathway program instead of the Metered Savings Program (Attachment I: LWC Bi-weekly Meeting Minutes, page 2, 3.24.22). Due to the new recreational programs and events that the Lindsay Wellness Center has implemented, there were concerns that it would be difficult to track Metered Savings Program energy savings as highlighted in the Predictability Analysis (Attachment J: LWC Predictability Analysis, 3.25.22).

SoCalREN informed the agency the Streamlined Savings Pathway Program program had comparable incentives (See Appendix A: Streamlined Savings Pathway Incentive Calculations) and offered the same SoCalREN support services as the Metered Savings Program, and that the best incentive option for the city moving forward was SoCalREN's Streamlined Savings Pathway Program. SoCalREN invited the city to their Streamlined Savings Pathway Program informational webinar that was held on March 30, 2022. Lisa Davis, the city’s recreation director, attended the webinar. On April 1, 2022, following the webinar, Lisa confirmed the city wanted to move forward with pursuing SoCalREN’s Streamlined Savings Pathway Program (Attachment K: SSP Program Confirmation Email, page 1, 4.1.22). Please reference (Appendix B) for Streamlined Savings Pathway program project proposal shared with the agency April 20, 2022. o Include cases of potentially negative influence including when the customer first initiated contact and why.
i. Negative influence is not applicable

Attachment A_ City
of Lindsay Signed Audit Commitment Form 2.11.20.pdf
Attachment B_
Lindsay Wellness Center CEA Follow-up Email 6.5.20.pdf

Attachment C_ City
of Lindsay CEA 6.18.20.pdf

Attachment D_
Lindsay Wellness Center Initial Measures List 12.2.20.pdf

Attachment E_
Lindsay Wellness Center Agency Services Plan 12.2.2

Attachment F_
Lindsay Wellness Center Updated Initial Measures List 4.15.20.pdf

Attachment G_
Lindsay Wellness Center IML Follow-Up Email 12.9.20.pdf

Attachment H_
Lindsay Wellness Center DER (P2Z) Audit Report 12.16.21.pdf

Attachment I_
Lindsay Wellness Center Bi-weekly Meeting Minutes 3.24.22.pdf

Attachment J_
Lindsay Wellness Center Predictability Analysis 3.25.22.pdf

Attachment K_ SSP
Program Confirmation Email 4.1.22.pdf
☒ Attachment(s) ☐ Screen shot(s) ☐ Both ☐ Other

2. What are the pre-existing conditions of the energy consuming systems or equipment on the customer’s facility? SW Project Feasibility Study V1.0 Page 7 | 26
o What is the age of this equipment?
i. The Lindsay Wellness Center was built in 2010. The existing equipment has not been updated or replaced since the initial installation. These original existing systems include: constant speed pool pump, metal Halide interior lighting, Halogen and Fluorescent exterior lighting, package AC units with degraded efficiency, non-programmable thermostats, and refrigerated vending machine that runs 24/7 (Attachment F: LWC Updated IML, page 2 Table, 4.15.20). o If the age is difficult to establish, what makes you believe you can estimate the equipment age? i. See comment above.
o What upgrades or component replacements have been done? i. See comment above.

Attachment F_
Lindsay Wellness Center Updated Initial Measures List 4.15.20.pdf ☒ Attachment(s) ☐ Screen shot(s) ☐ Both ☐ Other

3. Does the facility suffer from any pain points, things they don’t like, or anything they are unhappy about with their current systems or equipment?
o Is the equipment very old or does it no longer meeting load/production? How were these issues identified?
i. Lindsay Wellness Center has not expressed any pain points. From SoCalREN’s analysis identifying potential energy efficient equipment upgrades at the Wellness Center, the agency was interested in replacing their existing equipment with energy efficient equipment that has programmable capability to adjust with facility demand time or facility closings, ultimately reducing their high energy consumption at the Wellness Center (Attachment F: LWC Updated IML, page 2 Table,

4.15.21).
o Any anecdotal evidence of increased failures, low reliability, increased maintenance? i. There is no anecdotal evidence of increased failures, low reliability, or increased maintenance on this equipment.
o Does the facility need re-programming the EMS/BMS, need re-recommissioning of any systems, not bright enough, buzzing noises or flicker, need to upgrade the “image” of the space? i. The re-programming and retrocomissioning proposed in this project application scope is driven by energy efficiency and the city’s goal of reducing their environmental impact, not by any facility requirements or image upgrades. (Attachment L: City of Lindsay Energy Action Plan (EAP), page 4 Introduction, 2.12.19).

Attachment F_
Lindsay Wellness Center Updated Initial Measures List 4.15.20.pdf

Attachment L_ City
of Lindsay Energy Action Plan 2.12.19.pdf
☒ Attachment(s) ☐ Screen shot(s) ☐ Both ☐ Other

4. What was the Customer planning to do prior to implementer/developer/PA intervention? o Business as usual (do nothing) is not assumed, in fact, the case that they were going to do something needs to be disproven, if possible.
i. Upon initial conversation with the City of Lindsay they had no immediate plans in action to implement energy efficiency measures at their facilities. However, the city introduced an Energy Action Plan (EAP) in February 2019 (Attachment L: EAP, 2.12.19). SoCalREN reviewed the Energy SW Project Feasibility Study V1.0 Page 8 | 26
Action Plan and noted that the city’s prospective EE projects aligned well with SoCalREN’s EE project delivery program.
o Are there any facility activities triggering code enforcement requirements that could affect the project? i. Not at this time.
o Plans to install a less efficient or less technically advanced version? i. This is not applicable.
o Has the facility upgraded similar equipment in the recent past at this site or similar facilities and what are the conditions surrounding the initiation of that project, e.g., did they pursue incentives or on-bill financing, and did they follow a deemed or custom approach? i. The existing equipment has not been updated or replaced since the initial installation when the facility was built in 2010.
o For projects that were previously identified but not implemented prior to program intervention. Need to obtain the reasons why customer did not implement previously, who identified (developer/customer/vendor, name and firm name) and when. i. This is not applicable.

Attachment L_ City
of Lindsay Energy Action Plan 2.12.19.pdf
☒ Attachment(s) ☐ Screen shot(s) ☐ Both ☐ Other

5. What specific recommendations were made for this project? How were they made? i. SoCalREN identified six energy efficiency measures recommended for Lindsay Wellness Center: 1) Pool Pump VFD, 2) Interior Lighting Retrofits, 3) Exterior Lighting Retrofits, 4) Package Unit Replacements, 5) Advanced Wifi Thermostats, and 6) Vending Miser during the energy audit to provide the city with energy savings, cost savings, project cost (includes COVID markup contingencies), and incentive estimates (Attachment F: LWC Updated IML, 4.15.20), (Attachment M: LWC Costing, 10.2021). The additional COVID markup budget contingency was approved by the city council and is based on current high cost variance. The initial projected project cost estimate remains unchanged.
o Did the customer once partake of any “lost leader” activities offered by the PA such as measure identification, or an energy audit?
i. SoCalREN identified all of the measures within the scope of this application and conducted an energy audit to provide the city with energy savings, cost savings, project cost, and incentive estimates (Attachment F: LWC Updated IML, 4.15.20).
o Describe past energy savings estimates, reports, analyses, problems identified, etc. that were provided to the customer.
i. During the audit site visit in August 2020 at the Lindsay Wellness Center with TRC and SoCalREN, six energy efficiency measures were identified: 1) Pool Pump VFD, 2) Interior Lighting Retrofits, 3) Exterior Lighting Retrofits, 4) Package Unit Replacements, 5) Advanced Wifi Thermostats, and 6) Vending Miser as well as Distributed Energy Resources measures outlined in the Initial Measures List presented in December 2020 (Attachment D: LWC IML, 12.2.20). SoCalREN later presented an updated Initial Measures List in April 2021 with the preliminary savings and project costs that were calculated which further intrigued the city into wanting to pursue the energy efficiency measures (Attachment F: LWC Updated IML, 4.15.21). After the agency decided to pursue the suggested measures, TRC supplied SoCalREN with an audit workbook showing estimated savings of 87,183 kWh, which is 26.5% of the Wellness Center’s annual usage (Attachment N: LWC Audit Workbook, 4.19.22). Please reference (Appendix B) for Streamlined Savings Pathway program project proposal shared with the agency April 20, 2022.

SW Project Feasibility Study V1.0 Page 9 | 26
ii. Due to COVID impacts, SoCalREN recommended to the city that they review and revise the project proposal to include a COVID mark-up related to the current cost catalog. SoCalREN provided expert guidance in assisting the city regarding the cash flow associated with their energy efficiency improvement projects. SoCalREN provided estimated project cost options that included a 15% overall markup and a 25% HVAC markup that reflected the current market conditions related to COVID-19 impacts and supply chain delays (Attachment M: LWC Costing, 10.2021). The Wellness Center director, Lisa Davis, presented the updated project proposal to the city council on November 9, 2021 and SoCalREN was present at the meeting to provide support and to answer any questions (Attachment O: Lindsay City Council Meeting Screenshot, 11.9.21). The additional COVID markup budget contingency was approved by the city council and is based on current high cost variance. The initial projected project cost estimate remains unchanged.

Attachment D_
Lindsay Wellness Center Initial Measures List 12.2.20.pdf

Attachment F_
Lindsay Wellness Center Updated Initial Measures List 4.15.20.pdf

Attachment M_
Lindsay Wellness Center Costing 10.2021 .pdf

Attachment O_
Lindsay City Council Meeting Screenshot 11.9.21.png
Attachment N_
Lindsay Wellness Center REN Audit Workbook 4.19.22

☐ Attachment(s) ☐ Screen shot(s) ☒Both ☐ Other

6. What did the customer do after interacting with the program administrator/implementer/developer? o Ex. They were going to do nothing and are now going to move forward with the project. i. Although the city introduced an Energy Action Plan in February 2019 (Attachment L: EAP,

2.12.19), prior to SoCalREN involvement, the city had no immediate plans to implement the energy efficiency measures that were identified by SoCalREN. After interacting with SoCalREN and understanding the project support and available incentives, the city stated interest in continuing to work with SoCalREN to explore the identified EE measures further (Attachment P: LWC Meeting Minutes, page 2 Project Details, 8.18.21).
o Ex. They were going to do the minimum efficiency (non-incentivized measure) and were moved to install the higher efficiency (eligible) measure.
i. See the response in the bullet point above.
o Describe specific discussions and dialogue on key decision points that influenced customer’s decision and enabled the customer to adopt an alternative action that improves final efficiency. i. After the updated Initial Measures List was presented to the agency on April 15, 2021, (Attachment F: LWC Updated IML, 4.15.21), the city expressed a key driver to be SoCalREN’s project management support that is only offered through the SoCalREN program pathways (Attachment P, page 2 section 2b: LWC Meeting Minutes). Lindsay’s city services are limited in staffing, so SoCalREN’s project management services are very valuable to them. SoCalREN’s incentives were also a key driver for the city to complement their budget funding. ii. SoCalREN’s Streamlined Savings Pathway program (SSP) was introduced to the city in March 2022 as a more compatible incentive pathway for the identified Lindsay Wellness Center (LWC) measures. After receiving the revised predictability analysis results, SoCalREN consultants recommended the city pursue the Streamlined Savings Pathway program instead of the Metered Savings Program (MSP) (Attachment I: LWC Bi-weekly Meeting Minutes, page 2, 3.24.22). Due to the new recreational programs and events that the Lindsay Wellness Center has implemented, there were concerns that it would be difficult to track Metered Savings Program energy savings as highlighted in the Predictability Analysis results (Attachment J: LWC Predictability Analysis,

3.25.22). SoCalREN informed the city that the Streamlined Savings Pathway Program program had comparable incentives, (See Appendix A: SSP Incentive Calculations) offered the same SoCalREN valued support services as the Metered Savings Program, and would be the best option for the city moving forward. SoCalREN invited the city’s recreation director, Lisa Davis, to the Streamlined SW Project Feasibility Study V1.0 Page 10 | 26
Savings Pathway Program informational webinar that was held on March 30, 2022. Following the webinar, on April 1, 2022, Lisa Davis confirmed the city wanted to pursue SoCalREN’s Streamlined Savings Pathway Program in order to explore this energy efficiency project with ongoing SoCalREN project management support and incentives (Attachment K: SSP Program Confirmation Email, page 1, 4.1.22). Please reference (Appendix B) for Streamlined Savings Pathway program project proposal shared with the agency April 20, 2022.

Attachment F_
Lindsay Wellness Center Updated Initial Measures List 4.15.20.pdf

Attachment I_
Lindsay Wellness Center Bi-weekly Meeting Minutes 3.24.22.pdf

Attachment J_
Lindsay Wellness Center Predictability Analysis 3.25.22.pdf

Attachment K_ SSP
Program Confirmation Email 4.1.22.pdf

Attachment L_ City
of Lindsay Energy Action Plan 2.12.19.pdf
Attachment P_
Lindsay Wellness Center Project Propo
☒ Attachment(s) ☐ Screen shot(s) ☐ Both ☐ Other

7. Who are the Customer decision makers (company role and title) and what were the business requirements that had to be fulfilled in order for the Customer to move forward with the measure/project? i. Neyba Amezcua (current City Services Manager) and Lisa Davis (Wellness/Aquatics/Recreation Director) are key decision-makers for the project at the City of Lindsay. Former City Servicers Manager, Michael Camarena,retired in 2021, and Neyba Amezcua has since taken over his role. o Financial criteria including access to financing, simple payback or ROI, bill savings, demand reduction, etc. i. Although The City of Lindsay introduced an Energy Action Plan in 2019 (Attachment L: EAP,

2.12.19), short-staffing and past financial hardships have not allowed the city to implement many of their energy goals and they expressed project support and additional financing would help them in achieving these goals (Attachment Q: LWC Bi-weekly Meeting Minutes, page 3, 2.24.22).

The Wellness Center director, Lisa Davis, confirmed during a bi-weekly meeting on October 28, 2021 that the Lindsay Local Hospital District Board of Directors approved the proposed capital funding budget inclusive of additional Covid-19 markup costs at their Monthly Board Meeting on October 19, 2021 at the Lindsay Wellness Center (Attachment R: LWC Bi-weekly Meeting Minutes, page 3, 10.28.21). Lisa presented the updated project proposal to the City Council on November 9, 2021 and covered an overall breakdown of project costs and savings (Attachment S:

City of Lindsay Council Meeting Agenda Packet, p185, 11.9.21). The additional COVID markup budget contingency was approved by the city council and is based on current high cost variance.

The initial projected project cost estimate remains unchanged. o If we can identify an EE project that meets their general criteria, when would they be able to move forward? Would they find a budget to do so this year? If not, would OBF allow them to implement it sooner?
i. Yes, if the EE project meets the city’s criteria and if incentives are secured, the city is ready to move forward as soon as possible.

Customers with energy or carbon reduction, green or sustainability goals/plans, show how they were influenced to switch to electricity instead of gas, gas instead of electricity, or to use more water to save electricity or gas, and the net Btu reduction (3-prong test). i. This is not applicable to this project.

Attachment L_ City
of Lindsay Energy Action Plan 2.12.19.pdf

Attachment Q_
Lindsay Wellness Center Bi-weekly Meeting Minutes 2.24.22 .pdf

Attachment R_
Lindsay Wellness Center Bi-Weekly Meeting Minutes 10.28.21.pdf

Attachment S_ City
of Lindsay Council Meeting Agenda Packet 11.9.21.pdf
☒ Attachment(s) ☐ Screen shot(s) ☐ Both ☐ Other

8. Accelerated Replacement (AR) projects must demonstrate with a Preponderance of Evidence both that program staff convinced the customer that the project was feasible and that energy efficiency was the critical factor for SW Project Feasibility Study V1.0 Page 11 | 26
pursuing the project. In other words, if not for the program the customer would not be moving forward with the project.
i. EEMs 2-4 are Accelerated Replacement (AR) measures.
o If a measure’s simple payback exceeds its Effective Useful Life (EUL), the Customer should explain the reason(s) behind the business decision to implement the measure(s) even though on paper it appears that the project is not profitable.
o EEMs 2-4 are Accelerated Replacement (AR) measures. The simple payback for EEMs 2, 3 and 5 do not exceed the Effective Useful Life (EUL). For EEM4 the simple payback is 23.3 years and the EUL is 15. o EEM4 was proposed to allow greater synergy between the package units and the proposed thermostats in EEM5. The existing package units are 12 years old and have Remaining Useful Lifespans of only 3 years.

The incremental savings and functionality associated with the HVAC measures were deemed to be greater than the loss of value associated with 3 years of existing HVAC life. o Cost effectiveness should be evaluated on a project-level basis. The project payback period is less than the project EUL.
o (See Appendix J) for Customer Affidavit.
o If a measure’s simple payback is ≤ 2 years without incentives, financial savings should not be used as the primary influence driver.
i. This is not applicable.
☐ Attachment(s) ☐ Screen shot(s) ☐ Both ☐ Other

2.3 E 5115 Requirements
According to Resolution E-5115, this project is classified as Very Low Rigor, since the incentive amount is below $7,500.

No photos or videos are required as preponderance of evidence.

Describe this project’s development, including factors and decision points that led to the customer’s decision to replace the existing equipment.

TRC performed a site audit of the facility in 2019. Equipment identified for AR measures (lighting, AC units, and thermostats) have remaining useful life of 2-3 years, but the energy and maintenance savings associated with upgrading the equipment immediately were deemed most attractive by the customer following SoCal REN/TRC’s presentation.

Describe the project developer’s services provided to the customer and timing of developer’s engagement compared to customer’s decision-making process.

TRC performed a site audit of the facility and presented potential measures to the customer in 2019. The customer expressed interest in all measures, and TRC developed full energy savings and costing calculations in 2020. The customer used the deliverables to decide to move forward with the project. See the Project Drivers section for greater discussion of influence, including correspondence logs.

Describe any major repairs performed to the existing equipment, not related to a full system overhaul, in the last 12 months.

No major repairs.

Describe any maintenance issues for the existing equipment, including maintenance costs, in the last 12 months.

SW Project Feasibility Study V1.0 Page 12 | 26
Equipment doesn’t have any major malfunctions; however, maintenance savings associated with updating the lighting and AC units were estimated at 3% of the measure costs, in line with previous non-energy benefit programs such as Prop 39 guidelines.

Demonstrate that the project is not part of the customer’s scheduled maintenance or equipment upgrade.

See Project Drivers section for proof that the project was a result of SoCal REN/TRC influence.

Provide information to demonstrate that the customer was not going to do this energy efficiency project anyway.

See Project Drivers section for proof that the project was a result of SoCal REN/TRC influence.

3. Project Details

3.1 Facility Description
The Lindsay Wellness Center is located in the City of Lindsay in Climate Zone 13. It was built in 2010 and is one of the City’s largest energy users. This 25,000 square foot facility provides various indoor and outdoor programming throughout the year for its local community in the aquatic center and fitness center. The Wellness Center offers group fitness classes, indoor basketball, weight training, and weightlifting areas, as well as an outdoor pool. The upper rooftop of the wellness center currently supports a 23-kW solar PV system. No battery storage systems or electric vehicle charging stations are located on the site. They offer a variety of educational and social activities and allow the community to rent out some event space for birthday parties, corporate events, and other celebrations. They also rent out space to vendors to provide physical therapy services. The Lindsay Wellness Center serves its local high school swim team, and youth community swimmers during the summer, as well as partnering with the local school district to provide water aerobics and other elective courses. Since 2021, they have been a COVID-testing and vaccination site.

Additionally, the PT programs stayed in operation during the COVID-19 pandemic and several indoor programs were transitioned outdoors.

Currently, the Lindsay Wellness Center’s operation hours are Monday through Friday 5am-7:30pm, which will continue until mid-May. Then they extend their hours and stay open until 8pm and add Saturdays 7am-12pm. They provide extended hours for swim team practices on the weekends to host swim meets. Swim meets vary year to year with an average of around 10 per year from March to July. Public pool and swim lessons begin the first Saturday in June and will continue until the end of August. During the summer, the pool runs 7 days a week with private rentals and swim team rentals. A typical Saturday will be around 15 hours of pool time and a Sunday will be around 4 or 5 hours. Annual pool maintenance occurs 6-8 weeks each December/January for therapy and big pools. The pool is shut down and not available for use during this time.

The Lindsay Wellness Center is located in the City of Lindsay in Climate Zone 13. It was built in 2010 and is one of the City’s largest energy users.

3.2 Energy Use Summary
Table 3.2: Facility Annual Electric Use
Service Account
Number Tariff (rate) Electric Meter Number(s)
Annual
Electrical
Usage
Peak (max) demand (kW)
8002975386 TOU-8-R 259000-068943 328,946 94
SW Project Feasibility Study V1.0 Page 13 | 26

3.3 Facility Equipment Inventory
The Lindsay Wellness Center is conditioned by four Package Gas-Fired AC Units. Each AC unit is controlled by a thermostat with simple scheduling capabilities. Pre-COVID, the units were scheduled 4AM-9PM Monday-Sunday, with heating/cooling setpoints of 68°F/70°F.

Table 3.3: AC Equipment Details
Facility Equipment
Inventory
Make & Model Qty.

Existing System
Installation Date
(Year)
Cooling
Capacity
(tons)
Heating
Capacity
(Btu)
Efficiency
(EER)
Annual
Equipment
Operating Hours
(Hrs)
Package GasFired AC UnitTrane
YFD181C3LA
4 2010 15 203,000 12 6,120
The majority of the Wellness Center’s lighting is provided by LED fixtures; however, a minority of fluorescent, halogen, and metal halide fixtures remain throughout the interior and exterior.

Table 3.4: Lighting Equipment Details
Existing Fixture Description Location
Lamp
Watts
Qty.

Occ
Sensor?
On-Bill
Operating
Hours
(Hrs)
Metal Halide High Bay Fixture Interior 400 18 No 3,911
2-Lamp Fluorescent T5 Surface Mount Fixture Interior 28 7 No 3,911 Halogen PAR38 Flood Lamp Exterior 100 12 No 782
3-Lamp Fluorescent T5 Surface Mount Fixture Exterior 28 2 No 782 The Wellness Center contains a 320,400-gallon pool that is circulated using a 20-HP pump. The pump runs at 890 gallons per minute at a constant speed, using a motor with a rated efficiency of 91%. To maintain minimum filtration requirements, the pump runs 24/7. The pool is shut down for annual maintenance one month out of the year.

4. Proposed Energy Efficient Measures (EEMs)

4.1 EEM 1 – Pool Pump VFD (Measure/Solution Code TBD)
Effective Useful Life (EUL)/Remaining Useful Life (RUL):

The effective useful life (EUL) for the vending miser is 5 years. The calculated weighted EUL for this measure can be viewed in the CPUC EUL Calculator (See Appendix F).

SW Project Feasibility Study V1.0 Page 14 | 26
Source: Based on EUL ID: Motors-fan, AOE would be capped at 5 years which is RUL for Motors-fan Standard Practice Discussion:

This measure does not trigger Title 24. The existing pump and motor are being kept. The variable speed drive (VFD) will maintain a minimum filtration turnover rate of 6 hours to maintain compliance with Title 24, Chapter 31B, Section 3124B.

Existing Equipment/System Operation:

The Lindsay Wellness Center was constructed in 2010 - all equipment being replaced or modified is original to the building’s construction.

The Wellness Center contains a 320,400-gallon pool that is circulated using a 20-HP pump. The pump runs at 890 gallons per minute at a constant speed, using a motor with a rated efficiency of 91%. To maintain minimum filtration requirements, the pump runs 24/7. The pool is shut down for annual maintenance that occurs during DecemberJanuary.

The baseline system is detailed in the “Wellness Center Pool VFD” spreadsheet (See Appendix G) Proposed Equipment/System Operation:

This measure will install a VFD on the 20-HP pump serving the pool. The VFD will allow the pump to reduce its speed to 60% during unoccupied periods, while maintaining a minimum turnover rate of 6 hours per filtration cycle while the pool is in use.

The proposed system is detailed in the “Wellness Center Pool VFD” spreadsheet (See Appendix G).

Calculation Methodology:

This measure was modeled using a custom spreadsheet, “Wellness Center Pool VFD” (See Appendix G). The spreadsheet accounts for the pool’s size and turnover rate, and the motor’s size, efficiency, load factor. The calculations use a VFD exponent of 2.2, which is in line with the DSM Engineering Policy (DSM E-PPICs 005)’s recommendation for fixed geometry, semi closed water systems.

Estimated Savings:

EEM 1 –Pool Pump VFD (Solution/Measure Code - TBD) Estimated Energy Savings Electricity Savings 37,614 kWh
Electric Peak Demand Savings 0 kW
Natural Gas Savings 0 Therms/yr

4.2 EEM 2 - Interior Lighting Upgrades (Measure/Solution Code TBD) Effective Useful Life (EUL)/Remaining Useful Life (RUL):

The effective useful life (EUL) for the vending miser is 12 years. The calculated weighted EUL for this measure can be viewed in the CPUC EUL Calculator (See Appendix F).

Source: DEER ID Iltg-Com-LEDfix-50000hr
Standard Practice Discussion:

SW Project Feasibility Study V1.0 Page 15 | 26
This measure is compliant with Title 24 Section 130.0 and 130.1. The proposed retrofit kits are Design Lights Consortium (DLC) listed as premium efficiency and perform beyond minimum code requirements and industrystandard practice for efficacy. The lights serve a gymnasium space already controlled by Title 24 compliant lighting timers. The proposed Type-A LED tubes do not Trigger Title 24.

Existing Equipment/System Operation:

The interior of the Wellness Center contains (18) 400W metal halide high bay fixtures serving its gymnasium space, and (7) 28W 2-lamp fluorescent T5 surface mounted fixtures serving its kitchen. The gymnasium lighting is controlled on a timer, and the kitchen is controlled via manual switch. The lighting operates from 5AM to 8PM Monday through Friday.

The baseline system is detailed in the “Lighting Calculations” spreadsheet (See Appendix H) Proposed Equipment/System Operation:

This measure will retrofit the existing gymnasium metal halide high bay fixtures with HID to LED retrofit kits, and will replace the kitchen fluorescent T5 tubes with LED T5 Type-A tubes. The retrofit kits and lamps will provide equivalent lighting to the spaces. No controls changes are proposed.

The proposed equipment is detailed in the “Lighting Calculations” spreadsheet (See Appendix H), and specifications are available in the “Specifications” folder (See Appendix D).

Calculation Methodology:

Savings were calculated using a custom spreadsheet. The custom spreadsheet accounts for HVAC interactive effects and lighting coincident diversity factors using DEER2020 multipliers. Baseline fixture wattages were determined using (See Appendix C).

The small quantity of base case linear fluorescent lamps within the measure are specialty fixtures with blue/red color output. Therefore, standard practice was assumed to be equal to their existing consumption.

Estimated Savings:

EEM 2 –Interior Lighting Retrofits (Solution/Measure Code - TBD) Estimated Energy Savings Electricity Savings 25,714 kWh
Electric Peak Demand Savings 1.7 kW
Natural Gas Savings 0 Therms/yr

4.3 EEM 3 -Exterior Lighting Retrofits (Measure/Solution Code TBD) Effective Useful Life (EUL)/Remaining Useful Life (RUL):

The effective useful life (EUL) for the vending miser is 12 years. The calculated weighted EUL for this measure can be viewed in the CPUC EUL Calculator (See Appendix F).

Source: DEER ID OLtg-Com-LED-50000hr
Standard Practice Discussion:

SW Project Feasibility Study V1.0 Page 16 | 26
The exterior lighting upgrade proposes lamp-only replacements and therefore does not trigger Title 24 code. The proposed lamps are Design Lights Consortium (DLC) listed as premium efficiency and perform beyond industry standard practice for efficacy.

Existing Equipment/System Operation:

The exterior of the Wellness Center contains (12) 100W halogen flood lamps and (2) 28W 3-lamp fluorescent T5 surface mounted fixtures. The fixtures operate on a clock, from 6PM to 9PM Monday through Friday.

The baseline system is detailed in the “Lighting Calculations” spreadsheet (See Appendix H).

Proposed Equipment/System Operation:

This measure will replace the existing exterior halogen flood lamps and fluorescent T5 tubes with equivalent LED TypeA lamps. The lamps will provide equivalent lighting to the spaces. No controls changes are proposed.

The proposed equipment is detailed in the “Lighting Calculations” spreadsheet (See Appendix H), and specifications are available in the “Specifications” folder (See Appendix D).

Calculation Methodology:

Savings were calculated using a custom spreadsheet. The custom spreadsheet accounts for HVAC interactive effects and lighting coincident diversity factors using DEER2020 multipliers. Baseline fixture wattages were determined using Lighting Standard Fixture Wattages (See Appendix C)
The small quantity of base case linear fluorescent lamps within the measure are specialty fixtures with blue/red color output. Therefore, standard practice was assumed to be equal to their existing consumption.

Estimated Savings:

EEM 3 –Exterior Lighting Retrofits (Solution/Measure Code - TBD) Estimated Energy Savings Electricity Savings 739 kWh
Electric Peak Demand Savings 0.9 kW
Natural Gas Savings 0 Therms/yr

4.4 EEM 4 Package Unit Replacements (Measure/Solution Code TBD) Effective Useful Life (EUL)/Remaining Useful Life (RUL):

The effective useful life (EUL) for the vending miser is 15 years. The calculated weighted EUL for this measure can be viewed in the CPUC EUL Calculator (See Appendix F).

Source: DEER ID HVAC-airAC
Standard Practice Discussion:

This measure is compliant with Title 24 requirements for AC unit efficiency - Table 110.2-A. The 15-ton units will exceed the Title 24 efficiency requirement of 11.0 EER. In addition, the proposed AC units will be equipped with dualtemperature economizers and variable speed supply fans.

Existing Equipment/System Operation:

The Wellness Center is conditioned by four 15-ton gas-fired package units with efficiency values of 12 EER. The package units are 11 years old, and are equipped with constant speed supply fans and economizers controlled by outside air temperature.

The baseline system is modeled in the “eQuest Files” folder (See Appendix E).

SW Project Feasibility Study V1.0 Page 17 | 26
Proposed Equipment/System Operation:

This measure will replace the four 15-ton gas-fired package units with high-efficiency units of equivalent size. The proposed units will be equipped with variable speed supply fans and dual-temperature controlled economizers, with efficiency values of 12 EER. Additional savings will likely be achieved by increase in system efficiency, but these savings are not being claimed as the baseline equipment efficiency is not being degraded in the calculations.

The proposed system is modeled in the “eQuest Files” folder (See Appendix E).

Calculation Methodology:

Savings were calculated using eQuest 3.65.7175. The eQuest model uses the Climate Zone 13 (CZ13) weather file and was calibrated to 2019 utility data, and is within 10% of annual utility consumption and 20% monthly consumption.

The calibration is located in the “eQ Calibration” tab of the “Mechanical Calculations” spreadsheet. (Attachment T:

Mechanical Calculations - COVID Projections 4.19.22 COVID). The calibration table accounts for both the site’s PV generation and the energy consumption at the pool.

Savings were exported as hourly reports and summarized in the “eQ Savings” tab of the “Mechanical Calculations” spreadsheet. (Attachment T: Mechanical Calculations - COVID Projections 4.19.22 COVID). The calibration table accounts for both the site’s PV generation and the energy consumption at the pool. The hours used for peak demand savings are July 8-10, 5PM-9PM.

Measures were modeled using parametric runs: Package Unit Replacements were modeled by increasing the supply fan efficiencies, changing supply fan controls to variable speed, and changing economizer controls to dual temperature. Advanced Wifi Thermostats were modeled by setting back the cooling and heating temperatures during the site’s opening and closing hours. The parametric runs use a rolling baseline to account for the interactive effects between the measures.

Although the efficiency of the package units have likely degraded in their 12 years of use, no degradation rate was assumed. The existing case 12-EER units exceed standard practice - calculations should be considered conservative.

Attachment T_
Mechanical Calculations - COVID Projections 4.19.22.xlsx Estimated Savings:

EEM 4 –Package Unit Replacements (Solution/Measure Code - TBD) Estimated Energy Savings Electricity Savings 12,580 kWh
Electric Peak Demand Savings 1.9 kW
Natural Gas Savings 0 Therms/yr

4.5 EEM 5 - Advanced Wifi Thermostats (Measure/Solution Code TBD) Effective Useful Life (EUL)/Remaining Useful Life (RUL):

The effective useful life (EUL) for the vending miser is 15 years. The calculated weighted EUL for this measure can be viewed in the CPUC EUL Calculator (See Appendix F).

Source: EULHOST / 3, Where EULHOST is 15 from DEER14: Air Conditioners (air-cooled, split and unitary) Standard Practice Discussion:

SW Project Feasibility Study V1.0 Page 18 | 26
This measure is compliant with Title 24 Section 110.2. The proposed wifi thermostats will be equipped with full setback capabilities. In addition, the thermostats will be equipped with advanced optimum start/stop controls.

Existing Equipment/System Operation:

The Wellness Center HVAC system is controlled by a thermostat system with simple scheduling capabilities. The thermostats run the package units from 4AM to 9PM, Monday through Friday, with a heating setpoint of 68°F and a cooling setpoint of 70°F.

The baseline system is modeled in the “eQuest Files” folder (See Appendix E).

Proposed Equipment/System Operation:

This measure will replace the existing thermostats with smart wifi thermostats. The thermostats will allow maintenance facilities to view and adjust zone temperatures remotely, and will be equipped with day-level setback controls. Additionally, the thermostats will replace the simple HVAC scheduling with smart optimum start/stop controls - the following is a general summary of the programming logic – mathematical formulas may vary between installers.

1. The optimum start/stop logic will use an intelligent algorithm to track the following variables:
· Space Temperature
· Outside Air Temperature
· Time
· HVAC Equipment Cooling/Heating Status

2. Using the above variables, the algorithm will use regression analysis to establish how quickly the HVAC system can cool/heat its dependent space at various outside air temperature conditions. Mathematically, this is expressed as (dT/dt)capacity.
· dTcapacity = (Space Temperature @ Time Period 1) - (Space Temperature @ Time Period 2)
· dtcapacity = Time Period 1 – Time Period 2. Increments will most likely be 15 minutes.

3. Prior to startup, the algorithm will measure the outside air temperature to determine the amount of cooling required, dTrequired. It will also track the amount of time left until occupancy, dtrequired. · Prior to startup, dTrequired will be equal to Current Space Temperature – Occupied Space Temperature Setpoint
· Prior to startup, dtrequired will be equal to Scheduled Occupancy Start Time – Current Time.

4. Once (dT/dt)required ≤ (dT/dt)capacity, the HVAC equipment will turn on.

SW Project Feasibility Study V1.0 Page 19 | 26
· For example, if it is currently 6AM and scheduled occupancy begins at 7AM, and there is a 4-degree temperature gap from existing space temperature to the occupied temperature setpoint, and the HVAC equipment can create temperature change of 4 degrees within 15 minutes, the system will remain off because (dT/dt)capacity > (dT/dt)required. At approximately 6:45AM, when (dT/dt)capacity ≤ (dT/dt)required, the system will turn on.

5. The logic will operate in reverse to establish how quickly the building naturally gains/loses heat at different Outside Air Temperature conditions when equipment is off to determine the optimal time to shut off equipment.

Classic occupancy scheduling faces a persistence challenge because it requires human intervention with each season, as cooling equipment needs to be started up earlier in warm months, and heating equipment in cold months. The start/stop algorithm ensures persistence because it automatically updates relative to the weather, eliminating the need for human intervention
The proposed system is modeled in the “eQuest Files” folder (See Appendix E).

Calculation Methodology:

Savings were calculated using eQuest 3.65.7175. The eQuest model uses the Climate Zone 13 (CZ13) weather file and was calibrated to 2019 utility data, and is within 10% of annual utility consumption and 20% monthly consumption.

The calibration is located in the “eQ Calibration” tab of the “Mechanical Calculations” spreadsheet. (Attachment T:

Mechanical Calculations - COVID Projections 4.19.22 COVID). The calibration table accounts for both the site’s PV generation and the energy consumption at the pool.

Savings were exported as hourly reports and summarized in the “eQ Savings” tab of the “Mechanical Calculations” spreadsheet. (Attachment T: Mechanical Calculations - COVID Projections 4.19.22 COVID). The hours used for peak demand savings are July 8-10, 5PM-9PM.

Measures were modeled using parametric runs: Package Unit Replacements were modeled by increasing the supply fan efficiencies, changing supply fan controls to variable speed, and changing economizer controls to dual temperature. Advanced Wifi Thermostats were modeled by setting back the cooling and heating temperatures during the site’s opening and closing hours. The parametric runs use a rolling baseline to account for the interactive effects between the measures.

Although the efficiency of the package units have likely degraded in their 12 years of use, no degradation rate was assumed - calculations should be considered conservative.

Optimum start/stop is not standard practice, so savings from standard practice were set equal to savings from the existing case.

Attachment T_
Mechanical Calculations - COVID Projections 4.19.22.xlsx

Estimated Savings:

EEM 5 –Advanced Wifi Thermostats (Optimum Start/Stop) (Solution/Measure Code - TBD) Estimated Energy Savings Electricity Savings 10,158 kWh
Electric Peak Demand Savings -0.1 kW
Natural Gas Savings 0 Therms/yr
SW Project Feasibility Study V1.0 Page 20 | 26

4.6 EEM 6 - Vending Miser (Measure/Solution Code TBD)
Effective Useful Life (EUL)/Remaining Useful Life (RUL):

The effective useful life (EUL) for the vending miser is 5 years. The calculated weighted EUL for this measure can be viewed in the CPUC EUL Calculator (See Appendix F).

Source: AG 8/17/2015 - EUL taken from SCE13CS002.2, which is from DEER (Plug-OccSens); DSM E-PPICs No. 050.0 Standard Practice Discussion:

This measure does not trigger Title 24 or any existing energy codes.

Existing Equipment/System Operation:

The entry lobby of the Wellness Center contains a single-door beverage refrigerator. The refrigerator currently runs 24/7, and is filled only with non-perishables.

The baseline system is included in the “Non-eQ Mech EEMs” tab of the “Mechanical Calculations” file, and is based on statewide workpaper SWAP-001. (Attachment T: Mechanical Calculations - COVID Projections 4.19.22 COVID).

Attachment T_
Mechanical Calculations - COVID Projections 4.19.22.xlsx Proposed Equipment/System Operation:

This measure proposes to install a vending miser controller in the beverage refrigerator. The controller will cycle the refrigerator’s compressor off at night to save energy.

The proposed system is included in the “Non-eQ Mech EEMs” tab of the “Mechanical Calculations” file, and is based on statewide workpaper SWAP-001.

Calculation Methodology:

Savings for this measure were taken from statewide workpaper SWAP-011: Vending and Beverage Merchandise Controller. Savings used are for a vending miser on a single-door refrigerated vending machine in CZ13.

Estimated Savings:

EEM 6 –Vending Miser (Solution/Measure Code - TBD) Estimated Energy Savings Electricity Savings 378 kWh
Electric Peak Demand Savings 0 kW
Natural Gas Savings 0 Therms/yr
SW Project Feasibility Study V1.0 Page 21 | 26

5. Project Cost & Financial Analysis
EEM
No.

Measure
Description
(Solution Code
TBD)
Measure
Type
Electricity
Savings
(kWh)
Electricity
Savings
(kW)
Cost Savings
Estimated
Installation
Cost (GMC)
Estimated
Incremental
Cost (IMC)
Incentive
Effective
Useful
Life
(EUL)
Estimated
Payback
(Years)
no
incentive
Estimated
Payback
(Years)
with
incentive
EEM-1
Pool Pump
VFD AOE 37,614 0.0 $6,399 $14,100 $14,100 $1,956 5 2.2 1.9 EEM-2
Interior
Lighting
Upgrades
AR 25,714 1.7 $4,876 $8,859 $8,859 $2,653 12 1.8 1.3
EEM-3
Exterior
Lighting
Upgrades
AR 739 0.9 $160 $692 $692 $76 12 4.3 3.9
EEM-4
Package Unit
Replacements AR 12,580 1.9 $7,775 $182,800 $182,800 $1,369 15 23.5 23.3 EEM-5
Advanced Wifi
Thermostats
(Optimum
Start/Stop)
AR 10,158 0.0 $3,148 $8,400 $8,400 $1,030 15 2.7 2.3
EEM-6 Vending Miser AOE 378 0.0 $64 $300 $300 $15 5 4.7 4.5 Sources Provided in the calculation sheet
TOTAL (ALL MEASURES) 87,183 4.5 $22,422 $215,151 $215,151 $7,099 9.7 9.6 9.3

6. Measurement and Verification Plan
The proposed project is classified by Resolution E-5115 as Very Low Rigor (Incentive <$7,500).

Measurement & Verification plans for each measure are detailed below:

EEM-1 (Pool Pump VFD): Equipment is not weather-dependent. No data logging required. At the post-installation stage, the variable speed drive should be observed, along with its speed setpoints.

EEM-2 (Interior Lighting): Equipment is not weather-dependent. At the post-installation stage, installation of the proposed equipment will be confirmed and quantities will be verified.

EEM-3 (Exterior Lighting): Equipment is not weather-dependent. At the post-installation stage, installation of the proposed equipment will be confirmed and quantities will be verified.

SW Project Feasibility Study V1.0 Page 22 | 26
EEM-4 (Package Unit Replacements): This measure pursues IPMVP Option D - Calibrated Energy Model. See the measure’s Calculation Methodology section for discussion of calibration. At the post-installation stage, installation of the proposed equipment will be confirmed and quantities will be verified.

EEM-5 (Smart Thermostats): This measure pursues IPMVP Option D - Calibrated Energy Model. See the measure’s Calculation Methodology section for discussion of calibration. At the post-installation stage, installation of the proposed equipment will be confirmed and quantities will be verified. Additionally, thermostat setpoints and schedules will be verified.

EEM-6 (Vending Miser): Equipment is not weather-dependent and savings are deemed. No data logging required. At the post-installation stage, the occupancy sensor should be observed and its ability to function should be confirmed.

7. Project Parameters for Utility Energy Efficiency Programs EEM 1 2 3 4 5 6
Site # / SA Number
Lindsay Wellness Center
Service Account #8002975386
Solution/Measure Code TBD TBD TBD TBD TBD TBD
Measure Description
Pool
Pump
VFD
Interior
Lighting
Upgrade
s
Exterior
Lighting
Retrofits
Package
Unit
Replaceme
nts
Advanced Wifi
Thermostats
(Optimum
Start/Stop)
Vending
Miser

MAT AOE AR AR AR AR AOE
Standard Practice
Applicable

N/A N/A N/A N/A N/A N/A
EUL (years) 5 12 12 15 15 5
RUL (years) N/A N/A N/A N/A N/A N/A
EUL Source
Based on
EUL ID:

Motorsfan, AOE
would be
capped
at 5
years
which is
RUL for
Motorsfan
IltgComLEDfix50000hr
OLtg-ComLED50000hr
HVAC-airAC
EULHOST / 3,
Where
EULHOST is 15
from DEER14:

Air
Conditioners
(air-cooled,
split and
unitary)
AG
8/17/2015 -
EUL taken
from
SCE13CS00

2.2, which
is from
DEER (PlugOccSens);
DSM EPPICs No.
050.0
EUL Justification
SW Project Feasibility Study V1.0 Page 23 | 26
Facility
Usage
kWh 328,946
kW 94
Therms/yr 2,859
1st Period
Baseline
Usage
kWh 114,107 35,354 1,091 270,093 257,513 378
kW 14 2 1 92 90 0
Therms
/yr
0 0 0 0 0 0
2nd Period
Baseline
Usage
kWh N/A 35,354 1,091 270,093 257,513 N/A
kW N/A 2 1 92 9290 N/A
Therms
/yr
N/A 0 0 0 0 N/A
Measure
Usage
kWh 76,493 9,640 352 257,513 247,355 0
kW 14.0 0.6 0.5 89.7 89.7 0.0
Therms
/yr
1st Period
Savings
kWh
kW
Therms
/yr
2nd Period
Savings
kWh N/A N/A N/A N/A N/A N/A
kW N/A N/A N/A N/A N/A N/A
Therms
/yr

N/A N/A N/A N/A N/A N/A
Gross Measure Cost
[GMC]

N/A N/A N/A N/A N/A N/A
Standard Measure Cost
[SMC]

N/A N/A N/A N/A N/A N/A
Incremental Measure
Cost [IMC]

N/A N/A N/A N/A N/A N/A
Accelerate Replacement
Cost [ARC]
Cost Documentation
[GMC]

N/A N/A N/A N/A N/A N/A
Cost Documentation
[SMC]

N/A N/A N/A N/A N/A N/A
SW Project Feasibility Study V1.0 Page 24 | 26
Cost Documentation
[IMC]

N/A N/A N/A N/A N/A N/A
Total
Estimated
Savings
kWh 37,614 25,714 739 12,580 10,158 378
kW 0 1.7 0.94 1.88 -0.05 0
Therms/yr N/A N/A N/A N/A N/A N/A
Total GMC $14,100 $8,849 $692 $182,800 $8,400 $300
SW Project Feasibility Study V1.0 Page 25 | 26

8. Appendix
Implementer shall include as an attachment any of the following applicable files (check appropriate box(es)):
☑ Comprehensive Existing System/Equipment Performance Data and operating conditions ☐ Photos of system/existing equipment
☑ Schematic/Diagram for existing system
☑ Proposed Equipment Spec Sheet (if applicable)
☑ Schematic/Diagram for proposed system
☑Equipment schedule of proposed system/equipment and/or load balance ☑ Cost proposal for proposed equipment and installation ☑ Energy models
☐ Production Data (if applicable)
Additional attachments:
1) Appendix A: Streamlined Savings Pathway Incentive Calculations Appendix A_
Lindsay Wellness Center SSP Incentive Calculations 4.20.22.xlsm 2) Appendix B: Streamlined Savings Pathway (SSP) Program Project Proposal Appendix B_
Lindsay Wellness Center Streamlined Savings Pathway Program Project Proposal 4.19.22.pdf 3) Appendix C: Table of Standard Fixture Wattages
Appendix C_Table
of Standard Fixture Wattages.pdf
4) Appendix D: Specifications Folder
5) Appendix E: EQuest File Folder
6) Appendix F: Effective Useful Life (EUL) Calculator
Appendix F_
Lindsay Weighted EUL Calculator.xlsm
7) Appendix G: Lindsay Wellness Center Pool VFD Spreadsheet SW Project Feasibility Study V1.0 Page 26 | 26
Appendix G_
Lindsay Wellness Center Pool VFD Spreadsheet 4.19.22xlsx.xlsx 8) Appendix H: Lighting Calculations Spreadsheet
Appendix H_
Lighting Calculations Spreadsheet.xlsx
9) Appendix I: Lindsay Wellness Center Whole Building Energy Efficiency Project - Influence Attachments (Project Drivers)
a) Attachment A: City of Lindsay Signed Enrollment Form, 2.11.20 b) Attachment B: Comparative Energy Analysis Follow-up Email, 6.5.20 c) Attachment C: City of Lindsay Comparative Energy Analysis, 6.18.20 d) Attachment D: Lindsay Wellness Center Initial Measures List, 12.2.20 e) Attachment E: Lindsay Wellness Center Agency Services Plan, 12.2.20 f) Attachment F: Lindsay Wellness Center Updated Initial Measures List, 4.15.20 g) Attachment G: Initial Measures List Follow-up Email, 12.9.20 h) Attachment H: City of Lindsay Distributed Energy Resources Audit Report, 12.16.21 i) Attachment I: LWC Bi-weekly Meeting Minutes, 3.24.22 j) Attachment J: Lindsay Wellness Center Predictability Analysis, 3.25.22 k) Attachment K: Streamlined Savings Pathway Program Confirmation Email, 4.1.22 l) Attachment L: City of Lindsay Energy Action Plan, 2.12.19 m) Attachment M: Lindsay Wellness Center Costing, 10.2021 n) Attachment N: Lindsay Wellness Center Audit Workbook, 4.19.22 o) Attachment O: Lindsay City Council Meeting Screenshot, 11.9.21 p) Attachment P: Lindsay Wellness Center Project Proposal Meeting Minutes, 8.18.21 q) Attachment Q: Lindsay Wellness Center Bi-weekly Meeting Minutes, 2.24.22 r) Attachment R: Lindsay Wellness Center Bi-weekly Meeting Minutes, 10.28.21 s) Attachment S: City of Lindsay Council Meeting Agenda Packet, 11.9.21 t) Attachment T: Mechanical Calculations - COVID Projections, 4.19.22 10) Appendix J: Customer Affidavit
SoCalREN Streamlined Savings Program Customer Affidavit for Accelerated Replacement (AR) Projects
I, __Joseph Tanner__, hereby certify that I am authorized to make this declaration as the Customer or as an authorized representative of the Customer, City of Lindsay.

By signing below, I certify that the existing equipment being replaced is in operating condition to the best of my knowledge. I acknowledge that misrepresentation will result in a rejection of all or part of the project and that the Customer may be required to return the incentives associated with this project.

I further acknowledge that misrepresentation will result in future projects submitted by the Customer being subjected to additional scrutiny and may result in Customer probation or suspension from current and future incentive programs.

Customer Information
Customer Name: City of Lindsay
Project Name: Lindsay Wellness Center - Whole Building Energy Efficiency Project Facility Address: 860 North Sequoia, Lindsay, CA 93247
Customer Contact Name: Joseph Tanner Customer Contact Title: City Manager Signature: ________________________ Printed: ___Joseph Tanner ___ Date: _____________________________ Title: _____City Manager_____ 2022 Version
SoCalREN Project Commitment Form
City of Lindsay | April 2022
Lindsay Wellness Center Whole Building
Energy efficiency measures have been identified at the Lindsay Wellness Center in the pool, gym and kitchen areas. The six measures proposed are estimated to save 87,183 kWh annually, which equates to saving the City of Lindsay $22,422 annually in utility costs. Additional benefits of this project include improving safety and reliability, increasing occupant comfort, reducing maintenance costs, hedging against increasing utility costs, and reducing greenhouse gas emissions by 70 metric tons annually, which equates to taking 15 cars off the road.

SoCalREN Customizable Services
Services Utilized to Date
✓ Project management support
✓ Comprehensive energy analysis
✓ Facility energy audit
✓ Project financing analysis
Additional Proposed Services
✓ Incentive application support
✓ Technical review
✓ Project financing analysis
✓ Procurement support
Project Timeline
Milestone Lead Estimated Deadline*
1 Prepare incentive application SoCalREN April 20, 2022 2 Sign incentive application documents Agency April 27, 2022 3 Develop work contract with Agency SoCalREN May 2022
4 Incentive and OBF application approval Utility June 2022 5 NTP issued to Contractor Agency July 2022
6 Contractor orders materials Contractor July 2022
7 Construction start Agency & Contractor September 2022 8 Construction end Agency & Contractor December 2022
9 Invoices submitted Agency & Contractor January 2023
10 Prepare & submit installation report SoCalREN February 2023 _____________________________________________________________________________________________________________________________________________________________________________ SoCalREN Project Commitment Form Version 6/2/2021
1 *Dates provided are estimated based on expected project milestones as determined by your SoCalREN Project Manager. Any changes to these dates should be communicated to the Project Manager immediately in order to ensure successful project completion.

Agency Roles & Responsibilities
Milestone & Task Agency Responsibilities
1 Prepare incentive
application
❏ Funding secured, Not secured or intent to fund project via (Circle all that apply)
OBF Loan Bond Grant CIP Gen. Fund
Other:_________________________________
2 Sign incentive
application documents
❏ Review Incentive Application and sign applicable Application documents
3 Procurement planning ❏ Conduct Procurement Kick-Off Meeting ❏ Select Procurement method (Circle one)
Formal Bid Sourcewell Sole Source Self Install JOC
Contract Amendment
❏ Review project scope with relevant City departments e.g.

Planning/Building Safety as needed
4 NTP issued ❏ Agency assigns Construction Project Manager role ❏ Construction Project Manager prepares and issues Notice to Proceed 5 Construction start ❏ Conduct Construction Kick-Off Meeting ❏ Oversee implementation of the project Scope of Work, budget, and schedule by Contractor, including review of any required equipment submittals
❏ Coordinate with Contractor to collect documentation required for Southern California Edison (SCE) Installation Report
6 Construction end ❏ Coordinate with Contractor to develop punch-list items for project close-out
❏ Verify construction and punch-list completion
7 Invoices submitted ❏ Submit all approved and paid project invoices to the SoCalREN Project Manager for Installation Report preparation. (Paid stamp not required for OBF projects)
SoCalREN Program Influence
Please explain in your own words why energy efficiency is a significant driver for this project:

The measures identified for this project should save 87,183 kWh annually, which equates to savings the City of Lindsay $22,422 annually in utility costs. The City of Lindsay will be able to reallocate some utility cost budget to other areas to better serve their community. _____________________________________________________________________________________________________________________________________________________________________________ SoCalREN Project Commitment Form Version 6/2/2021
2 Commitment Form Acknowledgement
I, Joseph Tanner acknowledge that the above responsibilities of the City of Lindsay for the Lindsay Wellness Center Whole Building project are required to be fulfilled in accordance with the project timeline in order for SoCalREN to render the services requested. Any unauthorized changes or alterations to the project scope and/or timeline may affect project financial performance, including loss of utility incentives and reduced energy savings.

Signature: _______________________________________________ Date: ____________ Title/Role: City Manager
_____________________________________________________________________________________________________________________________________________________________________________ SoCalREN Project Commitment Form Version 6/2/2021
3

Page 1 of 3 ends

LINDSAY LOCAL HOSPITAL DISTRICT

BOARD OF DIRECTORS

MINUTES
Regular Meeting
October 19, 2021
6:00PM
Hospital District Boardroom
831B N. Sequoia Ave.

Lindsay, CA 93247

1. OPEN SESSION
a. The meeting was called to order by President Loftin at 6:03 pm. b. Flag Salute was led by Director McQueen

2. ROLL CALL
Directors Present: McQueen, Loftin, Soria, Velasquez, Hernandez Directors Absent: None
Others Present: Attorney Starr Warson, Administrative Assistant Dennis Medders

3. APPROVALL OF THE AGENDA
Attorney Warson requested an action item be added to the agenda regarding AB 361.

The agenda was approved with the addition of the action item.

Motion: Director Velasquez
Second: Director McQueen
Vote: Unanimous (motion approved)

4. PUBLIC COMMENT
There was no public comment.

5. CONSENT CALENDAR
The consent calendar was approved:

Motion: Director Soria
Second: Director McQueen
Vote: Unanimous (motion approved)

6. REPORT(S) & INFORMATION
a. Correspondence – Administrative Assistant Medders reported there was no correspondence.
b. Director/Officer Reports – Directors Velasquez and Soria reported on the Wellness Center and the events they are planning. Director McQueen reported we received $9,470.50 in monthly rental payments.
c. Youth Representative Report - There was no report
d. Lindsay Wellness Center – Director Soria handed out a flyer for the Wellness Centers Open House & Resource Fair on Saturday, October 23, 2021. Stephanie Velasquez Orosco has been appointed to the position of Administrative Secretary. e. Healthy Lindsay - Sandra Escudero gave a brief report on the diabetes project. The quarterly report was sent to the Board members via email prior to the Board Meeting.

Page 2 of 3 ends

f. Lindsay Foothill Rotary - Ana Carretero, President of the Lindsay Foothill Rotary Club made a presentation in which they are requesting 200 PPE’s for their 2nd annual turkey give-a-way. The matter will be on the next agenda as an action item.

7. ACTION ITEMS
a. Consideration/Approval to amend the funding request for the capital outlay projects at the Wellness Center. Due to increased cost of materials the City of Lindsay is requesting the Board amend its prior funding approval of $374,588.00 to $467,632.00 an increase of $93,000.00 over a three-year period. After some discussion, the Board approved the increase in funding as presented.

Motion: Director Velasquez
Second: Director Soria
Vote: Unanimous (motion approved)
b. Consider/Approve Funding Request from Lindsay Foothill Rotary – Tabled until next regular board meeting.
c. Consider/Approve McDermont First Capital Improvement Grant Match in the amount of $12,000.00. The funding grant was approved.

Motion: Director Soria
Second: Director Hernandez
Vote: Unanimous (motion approved)
d. Consider/Approve Kaweah Health Child & Adolescent Psychiatry Fellowship Funding Request. After considerable discussion, the Board approved a funding amount of not to exceed $20,000.00 for the remodel.

Motion: Director Hernandez
Second: Director Loftin
Vote: Unanimous (motion approved)
e. Consider/Approve cleaning service for Lindsay Hospital District Board Room – Tabled until next regular board meeting.
f. Consider/Approve the President and Treasurer to sign the engagement letter for the 2020-2021 audit.

Motion: Director McQueen
Second: Director Hernandez
Vote: Unanimous (motion approved)
g. Consider/Approve to move forward with AB361 - The Lindsay Local Hospital District Board determines that an emergency still exists relating to COVID-19 and the board will continue to allow virtual online meetings.

Motion: Director Velasquez
Second: Director McQueen
Vote: Unanimous (motion approved)

Page 3 of 3 ends

8. LEGAL COUNCIL REPORT – Attorney Warson reported to the Board that the district website needs a public comment section added so the public can submit written comments to the Board. In the matter of the rental payments from Kaweah Health, it has been reconciled and they owe the district some back payments.

9. ADJOURN – The meeting was adjourned at 7:27 p.m. by the following vote:

Motion: Director Soria
Second: Director McQueen
Vote: Unanimous (motion approved)
Submitted,
________________________
Ivet Soria
Secretary
DocuSign Envelope ID: 131A39C8-6255-44C5-A467-C4ACE1DB0D4F DocuSign Envelope ID: 131A39C8-6255-44C5-A467-C4ACE1DB0D4F DocuSign Envelope ID: 131A39C8-6255-44C5-A467-C4ACE1DB0D4F 4/7/2022

MUBARAK GEHAM

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Curtis Cannon, Planning Manager
DEPARTMENT:

ITEM NO.:

City Services & Planning

11.1 MEETING DATE: April 26, 2022

ACTION & RECOMMENDATION
Consider Minute Order Authorization of Modifications to Sections Six, Seven, and Eight (Phases III, IV, and V) of the City of Lindsay Water Conservation Plan.

BACKGROUND | ANALYSIS
Water conservation throughout the State of California is a significant program. The impact to the City of Lindsay is just as significant, if not more so. The continued drought is problematic to all residents, business owners and any operations within the City limits, which the City provides water service. The recent announcement of water allocations has put the City in a circumstance that requires immediate action. Therefore, staff recommends that Sections Six, Seven, and Eight of the City of Lindsay Water Conservation Plan, regarding strict enforcement, emergency water conservation and extreme water crisis be modified with more strict guidelines and policies.

Title 1, General Provisions Section 1.16.010 of the Lindsay Municipal Code identifies the penalty for code violations, and any proposed changes will be dully noticed and are tentatively planned to be presented at the May 10, 2022, Regular Meeting.

Sections Six, Seven, and Eight encompass the following phases. • Phase III: Strict Enforcement
• Phase IV: Emergency Water Conservation
• Phase V: Extreme Water Crisis
A summary of the recommended modifications to the existing policy are demonstrated below in red.

Section 6
Phase III – Strict Enforcement
• Fines for Misusing Water (watering schedules, days, times, etc.) • Residential
a. Informal, Written Warning
b. Formal, Written Warning

STAFF REPORT

Page 2 ends

c. Punitive Fine, A fine not exceeding one hundred dollars ($100.00) for a first violation d. Punitive Fine, A fine not exceeding five-hundred dollars ($500.00) for a second violation of the same ordinance within twelve (12) months.
e. Punitive Fine, A fine not exceeding one thousand dollars ($1,000.00) for each additional violation of the same ordinance within twelve (12) months. • Commercial/Industrial
a. A fine not exceeding one thousand dollars ($1,000.00) for a first violation. b. A fine not exceeding five thousand dollars ($5,000.00) for a second violation of the same ordinance within twelve (12) months.
c. A fine not exceeding ten thousand dollars ($10,000.00) for each additional violation of the same ordinance within twelve (12) months.

Section 7
Phase IV – Emergency Water Conservation
• Mandatory Water Use Schedule
o The Plan allows two (2) days of watering per week to irrigate (odd and even address system). The recommended modification is to implement one (1) day a week available to irrigate; Wednesday for odd addresses, and Saturday for even addresses. • Fines for misusing water (water schedules, days, times, etc.) o Residential
a. Punitive Fine, A fine not exceeding one hundred dollars ($100.00) dollars for a first violation.
b. Punitive Fine, A fine not exceeding five hundred dollars ($500.00) for a second violation of the same ordinance within twelve (12) months). c. Punitive Fine, A fine not exceeding one thousand dollars ($1,000.00) for each additional violation of the same ordinance within twelve (12) months. o Commercial/Industrial
a. A fine not exceeding one thousand dollars ($1,000.00) for a first violation. b. A fine not exceeding five thousand dollars ($5,000.00) for a second violation of the same ordinance within twelve (12) months.
c. A fine not exceeding ten thousand dollars ($10,000.00) for each additional violation of the same ordinance within twelve (12) months.

Section 8
Phase V – Extreme Water Crisis
• No new water Connections shall be permitted until Phase V restrictions are rescinded (at the discretion of the Director of City Services & Planning). • Fines for misusing water (water schedules, days, times, etc.) o Residential

STAFF REPORT

Page 3 ends

a. Punitive Fine, A fine not exceeding one hundred dollars ($100.00) for a first violation.
b. Punitive Fine, A fine not exceeding five hundred dollars ($500.00) for a second violation of the same ordinance within twelve (12) months. c. Punitive Fine, A fine not exceeding one thousand dollars ($1,000.00) for each additional violation of the same ordinance within twelve (12) months) o Commercial/Industrial
a. A fine not exceeding one thousand dollars ($1,000.00) for a first violation. b. A fine not exceeding five thousand dollars ($5,000.00) for a second violation of the same ordinance within twelve (12) months.
c. A fine not exceeding ten thousand dollars ($10,000.00) for each additional violation of the same ordinance within twelve (12) months.

This action would be exempt from the California Environmental Quality Act (CEQA).

FISCAL IMPACT
There is no fiscal impact to the city. The city could see increased revenues in the form of fines derived from non-compliant water users.

ATTACHMENTS
• City of Lindsay Water Conservation Plan (Amended June 28, 2016)

CITY OF LINDSAY

WATER CONSERVATION PLAN
Amended June 28, 2016

SECTION I

INTRODUCTION
The City of Lindsay is located on the east side of the San Joaquin Valley in Tulare County near the base of the Sierra Nevada Mountains. The City is traversed by State Highway 65 running north and south along the west side of the City. Lindsay is located approximately 12 miles east of Tulare and State Highway 99, approximately 11 miles north of Porterville and 18 miles southeast of Visalia, the County seat of Tulare County.

The City of Lindsay was incorporated on February 29, 1910 as "Class Six" city under the laws of the State of California. The area within the existing City limits contains approximately 2.72 square miles or 1,743 acres of which approximately 82.1 percent is presently developed for commercial, industrial and residential use.

As a Charter City of the State of California, Lindsay is governed by an elected five member City Council, one of whom serves as Mayor. Administrative officials include a City Manager, City Clerk, City Attorney, Finance Director, City Engineer, City Services Director, Planning and Economic Development Director and Director of Public Safety. The major city departments consist of Public Safety (police and fire), Planning and Economic Development, and City Services.

The City also owns and operates McDermont Field House, a recreational and sports facility along with the Wellness Center. Each facility has a Director overseeing staff and operations. 2 of 14
SECTION 2

WATER SUPPLY AND WATER SYSTEM
The City of Lindsay’s water system consists of approximately 2,900 service connections in the current service area. Greater than 95% of the connections are metered. All new water connections are required to be metered.

The City of Lindsay's water system supply consists of three deepwells supplied by groundwater aquifers both inside the City's service area as well as outside the city limits, 2,500 acre feet of surface water purchased annually from the United States Department of the Interior, Bureau of Reclamations, Central Valley Project, at Millerton Reservoir and delivered to the City's point of delivery by way of the Friant Kern Canal and a 4.0 million gallon steel storage tank located on Todd’s Hill.

Monitoring and partial control is provided by wireless digital data signals telemetry to the well sites and the water storage tank.

Historically, the surface water supply is the City of Lindsay's primary source of water. The groundwater supply is considered as the City's secondary source and is utilized to satisfy peak demands on the system.

The fluctuation and deterioration of groundwater quality, with particular respect to nitrates (N03), Perchlorate (ClO4) and Dibromochloropropane (DBCP, C3H5Br2Cl) with the City's deepwells has put additional pressure and importance on the surface water supply.

In 2013 and 2014 drought conditions have risen to levels never experienced in California. These conditions along with a requirement to supply water to the San Joaquin River and other longstanding water rights commitments have substantially reduced the surface water supply to a below normal amount available to the City through its annual contract with the United States Department of the Interior, Bureau of Reclamations. The amount declared in the 2014 water year was 0% of the normal 2,500 acre feet of surface water available to the City.

With the very limited surface water and groundwater supplies, it will be necessary for the City of Lindsay to promote and enforce this water conservation plan in order to provide sufficient water to meet community demands.
3 of 14
SECTION 3

CONSERVATION MEASURES
The City of Lindsay is aware of the need for continual water conservation and through direction by the City Council has adopted resolutions and ordinances to provide staff with the means of implementing and enforcing necessary water conservation measures.

Through this updated Water Conservation Plan, the City will continue their efforts in water conservation and adopt new policies and guidelines as the need becomes apparent. This revised plan has been developed around a 5 Phase approach with the following structure:

Phase I - Water Conservation
Phase II - Water Monitoring
Phase III - Strict Enforcement
Phase VI – Emergency Water Conservation
Phase V – Extreme Water Crisis
The benefits of conserving water as a limited natural resource, through this format will be realized by the community in the form of reduced energy costs, reduced impact on the Wastewater Treatment Plant and sufficient water supply during peak demands. It is the intent of the water conservation plan be a joint effort of all residents and water users and the City and through community efforts, optimal results will be achieved.

Actions within each phase have been defined as either actions to be undertaken by the City or by the General Public. Due to the number of variables which affect the water conditions in existence at any one point in time, a report by City Staff, will describe the necessary action for transition from one phase to another (more or less stringent). At such time as staff has determined that the water condition warrants advancement to a more stringent phase, a report and request will be forwarded to the City Council for their review and approval.
4 of 14
SECTION 4

PHASE I - WATER CONSERVATION
Through a joint effort of the City and General Public, this phase is established to conserve water, a limited natural resource, through reductions of water waste and implementation of guidelines for more efficient use of the available limited supply of water. Phase I typically applies during periods when an average water supply is forecast.

The following outline describes steps to be taken by the City as well as Residents that makes it possible to achieve the above goals:
• The City shall implement a "Public Awareness Program" designed to make the community aware of the water conditions.
• The City shall develop a set of "Water Conservation Guidelines" that would be made available to residents for use in conserving water.
• The City shall keep the community aware of changing conditions through news media. This is necessary in the event that stricter conditions may be coming in the future. • Enforce most current and adopted building codes and regulations that deal with building construction with regard to water and energy conservation. • Request that residents reduce landscape irrigation practices to a minimum. Request that landscape irrigation be performed during late evenings or early mornings to reduce the amount of water lost due to evaporation.
• Require that all new developments follow model water efficient landscape designs, including automatic irrigation systems with rain control gauges. • Require that all new developments follow model water efficient landscape designs with regard to plantings and planting designs and layout.
• Discourage users from washing down sidewalks and driveways. Request that this item be accomplished by other means such as sweeping, etc.
• Request that restaurants support the water conservation effort by serving water upon request only.
• The City shall reduce all landscape irrigation practices to a minimum. 5 of 14
• The City shall intensify its leak detection program by repairing or replacing leaking valves, water meters and fire hydrants as necessary.
• Coordinate with local schools to implement a Water Education Program that would instill a water conservation ethic in the minds of today's youth. This alone can permanently affect the water using habits of tomorrow's adults.
• The City's fire hydrant testing schedule shall be arranged so that fire hydrant testing occurs during off peak periods. Fire Hydrant testing and flushing is a necessary item to provide the public with safe, clean water for fire protection and domestic use. 6 of 14
SECTION 5

PHASE II - WATER MONITORING
Phase II typically applies during periods when below average water supply is forecast.

When it is found that it is necessary to implement Phase II of the Water Conservation Plan, the City shall advise the City Council of the need for a more aggressive water conservation program due to forth coming shortfalls in supply and/or increased demands on the system. With the adoption of Phase II of the Water Conservation Plan, the City shall intensify its water conservation efforts by the following practices:
• The City shall take a more aggressive approach with the "Public Awareness Program" designed to make the community aware of the water conditions and possibility of a water shortage.
• The City shall reduce landscape watering of City facilities, additionally as deemed necessary to provide only enough water required to maintain survival of permanent plants such as trees and shrubs.
• The City shall begin monitoring water use by residents or large commercial, institutional or industrial water users and alerting them to the potential impact of waste or over use. In this Phase a verbal warning would be issued and a citation issued if the condition were to continue.
• All items of Phase I Water Conservation would be intensified. All residents would be asked to increase their water conservation efforts.
• The City would implement a voluntary water use schedule that would define days available to irrigate (odd and even address system) landscaping as follows; From June 1st to September 30th annually, or as conditions require:

1. Odd numbered street addresses water only on Wednesdays, Fridays and/or Sundays.

2. Even numbered street addresses water only on Tuesdays, Thursdays, and/or Saturdays.

3. No outdoor watering on Mondays.

4. This program also encourages customers to turn off their sprinklers on rainy days.

5. No watering between 9:00 AM and 9:00 PM.
7 of 14
Voluntary water use schedule table;
Sunday Monday Tuesday Wednesday Thursday Friday Saturday Odd No Watering Even Odd Even Odd Even
The voluntary watering schedule does not apply to:

1. Drip irrigation systems;

2. Handheld watering methods with automatic shutoff mechanism;

3. Flower and vegetable gardens;

4. Outdoor potted plants and hanging baskets;

5. Newly planted lawns.
8 of 14
SECTION 6

PHASE III - STRICT ENFORCEMENT
Phase III typically applies during periods when water supply shortages are probable or in extreme conditions such as continued and/or widespread drought.

In the event it is found necessary to implement Phase III of the Water Conservation Plan, the City shall advise the City Council of the need for a more aggressive and stringent water conservation program due to probable shortfalls in supply and/or increased demands on the system. With the adoption of Phase III of the Water Conservation Plan, the City shall implement the following mandatory water conservation provisions:
• The City will intensify its efforts to inform the public of the need for Water Conservation with special emphasis given to inform the Public of water shortage conditions. • The City shall intensify efforts of community awareness by stepping up information of changing conditions through news media.
• All items of Phase I and Phase II Water Conservation would be intensified. All residents would be asked to increase their water conservation efforts. • The City shall reduce landscape watering, of City facilities, additionally as deemed necessary to confine impact on the water system. If it becomes necessary, watering of City facilities, parks and median islands will be suspended and evaluated each day. • The City would implement a mandatory water use schedule that would define days available to irrigate (odd and even address system). The schedule is identified in Phase II of this Water Conservation Plan.
• The City will strictly enforce the water conservation program by issuing written warnings or fines for misusing water. It is the objective of the City Council of the City that citizens of Lindsay voluntarily comply with the provisions of this Section. Enforcement of this Section will authorize one informal written notice and one formal written notice. Per Title 1, General Provisions of the Municipal Code of the City of Lindsay, Chapter 1.16, General Penalty, Section 1.16.010, Penalty for Code Violations, the following amounts will be enforced; a. Informal, Written Warning
b. Formal Written Warning
c. Punitive Fine, $50.00
d. Punitive Fine, $100.00
e. Punitive Fine, $250.00
9 of 14
The definitions of misusing water shall be;

1. Washing down driveways and sidewalks;

2. Watering of outdoor landscapes that cause excess runoff;

3. Using a hose to wash a motor vehicle, unless the hose is fitted with a shut-off nozzle;

4. Using potable water in a fountain or decorative water feature, unless the water is recirculated.

5. Watering outside of the designated day and time for the specific property (address).

Any monetary fine issued will be collected via the monthly utility bill and follow the most current utility collection ordinance.
• The City could establish a usage allowance for water use based on past usage. Services that exceed the allowed usage allowance could be charged a higher rate (the rate would be set by Council action in the event this type of action would be necessary) for water. • A 15% rate increase on all residential and landscape accounts may go into effect upon Council adoption after notice, hearing and other rate-setting or adjustment procedures as required by applicable law. This rate increase will encourage water conservation and will also serve as a provision to recover the lost revenues from water conservation. The increase will begin upon adoption and end when water supply shortages or extreme conditions such as continued and/or widespread drought are under control. 10 of 14
SECTION 7
PHASE IV – Emergency Water Conservation
Phase IV typically applies during periods when water supply shortages exist or in extreme conditions such as continued and/or widespread drought.

In the event it is found necessary to implement Phase IV of the Water Conservation Plan, the City shall advise the City Council of the need for a more aggressive and stringent water conservation program due to imminent shortfalls in supply and/or increased demands on the system or continued mandates from the State of California. With the adoption of Phase IV of the Water Conservation Plan, the City shall implement the following mandatory water conservation provisions:
• The City will intensify its efforts to inform the public of the requirement for Water Conservation with special emphasis given to inform the Public of water supply conditions. • The City shall intensify efforts of community awareness by stepping up information of changing conditions through news or social media.
• All items of Phase I, Phase II and Phase III Water Conservation would be intensified. All residents would be required to increase their water conservation efforts. • The City shall implement a mandatory outdoor water use schedule that would define two days available to irrigate (odd and even address system). The schedule is identified as follows:

Sunday Monday Tuesday Wednesday Thursday Friday Saturday Odd No
Watering Even
Odd No
Watering
No
Watering Even
• Watering of turf on median islands in public right of way shall be suspended. • Watering on designated days shall only be allowed between 9:00 pm –9:00 am. • No watering will be allowed between 9:00 am – 9:00 pm. • All new permits shall satisfy the latest requirements of the California Model Landscape Ordinance, including already approved, but not yet completed permits. 11 of 14
• Washing of automobiles, trucks, trailers, boats, airplanes, and other mobile equipment is permitted with handheld watering devices with automatic shut off nozzles and only during designated days and times.
• Any outdoor use of handheld watering devices with automatic shut off nozzles (including vehicle washing use of pressure washing equipment) used during designated days and times are limited to 30 minutes of use for each watering day. • No outdoor watering during, or within 48 hours of, measurable rain. • Spas, wading, and swimming pools are only allowed to be refilled or added to during designated days and times. Water slides or water bounce houses or other private water attractions shall only be allowed during designated days and times and with a hose controlled with shut off nozzle.
• Collection of grey water from indoor uses is highly recommended. Distribution of grey water on outdoor landscaping is highly recommended to be done on respective water days.
• The City will strictly enforce the water conservation program by issuing a written warning or fines for misusing water. It is the objective of the City Council of the City that citizens of Lindsay voluntarily comply with the provisions of this Section. Enforcement of this Section will authorize one informal written notice only. Per Title 1, General Provisions of the Municipal Code of the City of Lindsay, Chapter 1.16, General Penalty, Section 1.16.010, Penalty for Code Violations, the following amounts will be enforced; a. Informal, Written Warning
b. Punitive Fine, $50.00
c. Punitive Fine, $100.00
d. Punitive Fine, $250.00
12 of 14
SECTION 8
PHASE V – Extreme Water Crisis
Phase V typically applies during periods when water supply shortages exist and in extreme conditions such as continued and/or widespread drought or unreliable water supply.

In the event it is found necessary to implement Phase V of the Water Conservation Plan, the City shall advise the City Council of the need for a more aggressive and stringent water conservation program due to existing shortfalls in supply and increased demands on the system. With the adoption of Phase V of the Water Conservation Plan, the City shall implement the following mandatory water conservation provisions:
• The City will intensify its efforts to inform the public of the requirement for Water Conservation with special emphasis given to inform the Public of water supply conditions. • The City shall intensify efforts of community awareness by stepping up information of changing conditions through news or social media.
• No outdoor irrigation of landscaping or vegetation. There shall be no watering outdoors until Phase 5 restrictions are rescinded.
• No washing of automobiles, trucks, trailers, boats or other types of mobile equipment except at commercial, fleet wash stations or fixed vehicle wash facilities (with approved runoff protection and collection) until Phase 5 emergency restrictions are rescinded. Mobile vehicle wash services shall not be allowed.
• Collection of grey water from indoor uses is highly recommended. Distribution of grey water on outdoor landscaping is highly recommended to be done on respective water days. • Outdoor water use for emergency purposes shall be by permit only, after review and approval by the City Services Director.
• City parks, schools, and similar establishments may water once per week by permit only, after review and approval by the City Services Director. • No new water connections shall be permitted until Phase 5 restrictions are rescinded. 13 of 14
• The City will strictly enforce the water conservation program by issuing a written warning or fines for misusing water. It is the objective of the City Council of the City that citizens of Lindsay voluntarily comply with the provisions of this Section. Enforcement of this Section will authorize one informal written notice only. Per Title 1, General Provisions of the Municipal Code of the City of Lindsay, Chapter 1.16, General Penalty, Section 1.16.010, Penalty for Code Violations, the following amounts will be enforced; e. Informal, Written Warning
f. Punitive Fine, $50.00
g. Punitive Fine, $100.00
h. Punitive Fine, $250.00
14 of 14

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Edward Real, Assistant City Planner
DEPARTMENT:

ITEM NO.:

City Services and Planning

11.2 MEETING DATE: April 26, 2022

ACTION & RECOMMENDATION
Consider Minute Order Approval of Temporary Use Permit (TUP) No. 22-07 and Request to Waive Temporary Use Permit Fee for a Cannonball Run Event Utilizing a Portion of Lindsay City Park at 850 N Elmwood Avenue, Lindsay, CA 93247 on May 07, 2022.

BACKGROUND | ANALYSIS
The American Legion Riders Chapter 20 (“applicant”) is a non-profit organization that does charitable work throughout Tulare County to raise money for local children’s hospitals, schools, veteran’s homes, severely wounded servicemembers, and scholarships for the children of servicemembers. The Cannonball Run will take place on May 7, 2022, between 8:00 AM and 12:00 PM. This event provides an opportunity for children from Tulare County to meet with other children who have experienced a death in their family.

A component of the Cannonball Run is the opportunity for participants to ride on a motorcycle with an experienced American Legion Rider from Porterville to various checkpoints in the area. One of those checkpoints being Lindsay City Park (park). The applicant is requesting to reserve a portion of the park (see attached Site Plan) to host a “Toilet Roll Toss Through a Toilet Seat”. This event requires participants to throw a toilet paper roll in a football throw fashion through a toilet seat. The toilet seats are fixed to a mobile platform. To ensure adequate nearby parking, the applicant is requesting to reserve nine parking spaces immediately to the south of the reserved park area.

The applicant has provided liability insurance and the City of Lindsay is named as an additional insured for the event and all participants will be required to sign a waiver.

As a condition of approval, the reserved area and the surrounding area shall be free of debris at the conclusion of the event. Additionally, the applicant will be held liable for any damage to City property including but not limited to the grass and sprinklers.

Please Note – At the time of publication, staff was awaiting a copy of applicants’ liability insurance coverage.

STAFF REPORT

Page 2 ends

FISCAL IMPACT
The fee for a Temporary Use Permit (TUP) is $600 and is deposited into the City’s General Fund.

However, if Council chooses to grant the applicant’s request of waiving the fee, then the City will see no revenue generated from this TUP. TUP 22-07 will not require any City resources.

ATTACHMENTS
• Site Plan
• Event Flyer
TUP 22-07
American Legion Riders Chapter 20 Cannonball Run
Legend
Proposed Event Area
Reserved Parking
200 ft
N Image Landsat / Copernicus
➤
Image Landsat / Copernicus
Image Landsat / Copernicus
Data LDEO-Columbia, NSF, NOAA
Data LDEO-Columbia, NSF, NOAA
Data LDEO-Columbia, NSF, NOAA
Data SIO, NOAA, U.S. Navy, NGA, GEBCO
Data SIONOAAUSNavyNGAGEBCO
Data SIO, NOAA, U.S. Navy, NGA, GEBCO

STAFF REPORT

Page 1 ends

TO: Lindsay City Council
FROM: Joseph Tanner, City Manager
DEPARTMENT: City Manager
ITEM NO.: 11.3
MEETING DATE: April 26, 2022

ACTION & RECOMMENDATION
Consider Approval of Resolution 22-17, A Resolution Approving the City of Lindsay Spending Plan for the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) Established by the American Rescue Plan Act Of 2021 (ARPA).

BACKGROUND | ANALYSIS
The American Rescue Plan Act (ARPA) was passed by Congress and signed into law by the President in March 2021. ARPA included funding for eligible state, local, territorial, and Tribal governments through the Coronavirus State and Local Fiscal Recovery Funds (SLFRF). The City of Lindsay’s direct allocation of SLFRF funds is $3,220,636.00. These funds are intended to cover eligible costs incurred from March 3, 2021, through December 31, 2024.

On January 6, 2022, the U.S. Department of Treasury (Treasury) released their Final Rule for the SLFRF (Final Rule). The Final Rule makes it easier for small cities and towns, or non-entitlement units like the City of Lindsay, to spend in familiar ways through the use of a “standard allowance” for lost public sector revenue. This option allows Lindsay to make use of the SLFRF in a way that makes the most sense for its unique population and needs while at the same time streamlining reporting and compliance requirements.

FISCAL IMPACT
None. ARPA expenditures will be sourced from the City’s share of the State and Local Fiscal Recovery Funds (SLFRF) of $3,220,636.00

ATTACHMENTS
• Draft City of Lindsay ARPA Spending Plan
• Resolution 22-17
DRAFT
American Rescue Plan Act – City of Lindsay
Spending Plan
Approved and Adopted:

MM-DD-YYYY by Resolution 22-XX
DRAFT
ARPA – City of Lindsay Spending Plan 2

EXECUTIVE SUMMARY
The American Rescue Plan Act (ARPA) was passed by Congress and signed into law by the President in March 2021. ARPA included funding for eligible state, local, territorial, and Tribal governments through the Coronavirus State and Local Fiscal Recovery Funds (SLFRF). The City of Lindsay’s direct allocation of SLFRF funds is $3.2 million.

On January 6, 2022, the U.S. Department of Treasury (Treasury) released their Final Rule for the SLFRF. The Final Rule makes it easier for small cities and towns, or “nonentitlement units” like the City of Lindsay, to spend in familiar ways through the use of a standard allowance for lost public sector revenue. The Final Rule allows nonentitlement units to claim up to $10 million in lost public sector revenue. The City of Lindsay intends to claim its full award of $3.2 million under the standard allowance.

This option allows Lindsay to make use of the SLFRF in ways that makes the most sense for Lindsay’s unique population and needs while at the same time streamlining reporting and compliance requirements.

GUIDING PRINCIPLES
The City of Lindsay recognizes the important role that the SLFRF will have on the community’s recovery from the COVID-19 pandemic and intends to leverage these funds to address the significant needs of Lindsay residents now and in the future.

ARPA funds provide a unique opportunity for the City of Lindsay to complete projects and pursue initiatives that will have a transformative and lasting impact on City services and the community. In this spirit, the City established the following principles to guide the allocation and use of ARPA funds.
• Be Transformational. Pursue projects and initiatives that solve an ongoing DRAFT
ARPA – City of Lindsay Spending Plan 3
problem and make a long-term and sustainable difference in the community. • One-Time Uses. Commit one-time ARPA dollars to projects and initiatives within a defined funding period.
• Equitable Outcomes. Prioritize projects or initiatives that aim to increase equitable recovery and future resilience for disadvantaged or unincorporated communities.
• Avoid Duplication. Ensure funded projects or initiatives do not duplicate services provided by the county, state or federal government, including duplication of other regional actors.

PRIORITY PROJECTS AND DESCRIPTIONS
Government services is the most flexible eligible use category under the SLFRF, allowing the City of Lindsay to take immediate action on priority projects and initiatives while remaining responsive to any unforeseen needs that may arise during the grant’s lifetime. Common examples of government services permitted by the Final Rule include road building and maintenance, and other infrastructure; health services; general government administration, staff, and administrative facilities, environmental remediation; and provision of police, fire, and other public safety services (including procurement of fire trucks and police vehicles).

The City of Lindsay has identified several priority projects and initiatives for immediate spending under the government services eligible use category. Remaining funds not currently allocated to a priority project will be used for government services in accordance with the standard allowance guidelines. The City of Lindsay is required to submit annual Project and Expenditure Reports to the U.S. Treasury.

DRAFT
ARPA – City of Lindsay Spending Plan 4
Replacing Lost Public Sector Revenue/Spending on Government Services Standard Allowance for the City of Lindsay: $3,220,363.00 Priority Project(s) for Immediate Funding (as of 04/22/2022) Estimated Cost Replacing Lost Public Sector Revenue/Spending on Government Services Further projects and initiatives TBD. Possible uses of eligible spending could include Public Safety salaries and associated benefits subject to City of Lindsay budget approval. Council approval will be sought as applicable per U.S.

Treasury guidelines and City of Lindsay policies.
$2,366,363
(75% of Total
SLFRF)
Downtown Fire Clean-Up Project
The City is committed to the overall beautification of the downtown area, including removing the blight to the community in the aftermath of the June 2021 commercial structure fire in the downtown area. Staff will seek services related to debris clean-up for the affected area, including filling the basement and bringing it up to finish grade for future development. $250,000
(7% of Total
SLFRF)
Economic Development and Retail Revitalization
Three-year contract with Retail Strategies, LLC for professional economic development services that include technical assistance and support for small business owners, a 5-year Downtown Revitalization plan, and retail recruitment with specific restaurant, grocery, apparel, home improvement, entertainment, and hospitality targets.
$230,000
(7% of Total
SLFRF)
Two (2) Firefighter Apparatus Engineers
First year salary and benefits for two (2) Firefighter Apparatus Engineer positions; duties and responsibilities include performing firefighting activities including driving fire apparatus, operating pumps and related equipment, laying hose, and performing fire suppression, containment, and extinguishment tasks; performing emergency aid activities including administering first aid and providing other assistance as required; participating in the inspection of buildings, hydrants, and other structures in fire prevention programs.
$180,000
(5% of Total
SLFRF)
DRAFT
ARPA – City of Lindsay Spending Plan 5
One (1) City Services Manager/Inspector
First year salary and benefits for City Services Manager/Inspector position; duties and responsibilities include complex supervisory, administrative, and professional work in managing projects to an outcome within project scope and within both project budget and schedule and varying inspections. The list of project types that will be managed include the following: transportation system construction and improvement projects, facility construction and improvement projects, major studies projects, water system construction and improvement projects, sewer and wastewater treatment plant related construction and improvement projects and significant capital maintenance projects, and other projects having a defined scope with a specific budget requiring schedule and project-risk management.
$100,000
(3% of Total
SLFRF)
City of Lindsay Essential Workers Premium Pay
Eligible full-time employees of the City of Lindsay will receive a one-time taxable payment of $2,000; eligible part-time employees of the City of Lindsay will receive a one-time taxable payment of $500. Eligibility criteria applied per Resolution 22-17.
$94,000
(3% of Total
SLFRF)

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-17

Page 1 of 2 ends

NUMBER 22-17
TITLE

MEETING

A RESOLUTION APPROVING THE CITY OF LINDSAY SPENDING

PLAN FOR THE CORONAVIRUS STATE AND LOCAL FISCAL

RECOVERY FUNDS (SLFRF) ESTABLISHED BY THE AMERICAN
RESCUE PLAN ACT OF 2021 (ARPA)
At a regularly scheduled meeting of the City of Lindsay City Council held on April 26, 2022 at 6:00 PM at 251 E. Honolulu Street, Lindsay, CA 93247 WHEREAS, on May 10, 2021, as a result of the COVID-19 virus, the U.S. Department of the Treasury announced the launch of the Coronavirus State and Local Fiscal Recovery Funds, established by the American Rescue Plan Act of 2021 (ARPA); and
WHEREAS, ARPA is designed to deliver $350 billion to state, local, territorial, and Tribal governments to bolster their response to the COVID-19 emergency and its economic impacts; and WHEREAS, the City of Lindsay’s total allocation of SLFRF funds is $3,220,636.00 and the City’s use of these funds must comply with ARPA grant requirements; and WHEREAS, at a December 14, 2021 Regular Meeting of the City Council, a public hearing was held to obtain comments regarding the City of Lindsay’s allocation of ARPA grant funds, and such hearing was duly noticed; and
WHEREAS, in the City of Lindsay Spending Plan attached hereto as “Exhibit A” the City of Lindsay expresses its intent to claim the standard allowance for lost public sector revenue of up to $10 million and identifies several priority projects for immediate funding such as Replacing Lost Public Sector Revenue/Spending on Government Agencies, Downtown Fire Clean-Up Project, Economic Development and Retail Revitalization, Two (2) Firefighter Apparatus Engineers, City Services Manager/Inspector; and City of Lindsay Essential Workers Premium Pay; and
WHEREAS, the City of Lindsay intends to distribute taxable premium payments, pending an executed side letter agreement with the bargaining groups, to eligible full-time and part-time employees who 1) have completed their required probationary period and 2) are current employees at the time of disbursement. Employees who have not yet completed the required probationary period will be eligible to receive their corresponding premium payment only once and if the probationary period is fulfilled; and WHEREAS, the City will comply with U.S. Treasury reporting and compliance requirements in annual Project and Expenditure Reports.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LINDSAY DOES HEREBY RESOLVE AS FOLLOWS:

A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF LINDSAY
RESOLUTION NO. 22-17

Page 2 of 2 ends

SECTION 1. The City Manager, or their designee, is authorized to accept the City of Lindsay’s allotment of Coronavirus State and Local Fiscal Recovery Funds, established by the American Rescue Plan Act of 2021 (ARPA) from the United States Department of Treasury.

SECTION 3. The City Manager, or their designee, is authorized to use the federal ARPA funds flexibly so as to maximize their lawful use within the framework established by the applicable federal programs.

SECTION 4. This resolution shall be effective immediately upon its approval and adoption.

SECTION 5. The Mayor, or presiding officer, is hereby authorized to affix their signature to the Resolution signifying its adoption by the City Council of the City of Lindsay, and the City Clerk, or their duly appointed deputy, is directed to attest thereto.

PASSED AND ADOPTED by the City Council of the City of Lindsay as follows:

MEETING DATE April 26, 2022
MOTION

SECOND MOTION
AYES
ABSENT

ABSTAIN
NAYS

CERTIFICATION OF THE FOREGOING RESOLUTION AS FULL, TRUE, PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF LINDSAY AS DETAILED.

MAYRA ESPINOZA-MARTINEZ RAMONA CAUDILLO

CITY CLERK MAYOR

← All documents from this meeting