RESOLUTION 2022-
RESOLUTION OF THE CITY OF LIVINGSTON CITY COUNCIL APPROVING OF CONDITIONAL USE PERMIT 2020-02 FOR THE SGM MOONGLO TRUCK STOP
COMPLEX AT THE SOUTHEAST CORNER OF CAMPBELL BOULEVARD AND
HAMMATT AVENUE
WHEREAS, pursuant to Livingston Municipal Code (“LMC”) section 5-6-9 (F), Rod Hawkins of Hawkins and Associates Engineering Inc., on behalf of SGM Moonglo, Inc., Property Owners, applied for a Conditional Use Permit for a Truck Travel Center that includes five quick serve restaurants, three with a drive-thru, fuel dispensing stations for passenger and tractor trailer vehicles and associated travel center facilities, at the southeast corner of Campbell Boulevard and Hammatt Ave, (APN Nos. 023-070-012, 023-070-013, 023-070-014, and 023-060-010), in the City of Livingston; and
WHEREAS, the site is zoned C-3 (Highway Service Commercial), PF, Public or Quasi-public facilities, and has a General Plan designation of Highway Commercial, Service Commercial, and Public Facility according to the official zoning map of the City of Livingston and the 1999 Livingston General Plan; and
WHEREAS, LMC Section 5-6-9 requires a Conditional Use Permit for “certain land uses that generally have a distinct impact on the area in which they are located, and/or are capable of creating special problems for bordering properties unless given special attention”; and the proposed gasoline service station and quick service restaurant with drive thru are ones of the so identified land uses; and
WHEREAS, a public hearing for the proposed project has been properly noticed by posting, a newspaper ad, and a mailing to adjacent properties within 300 feet of the site; and WHEREAS, Staff has reviewed the project with reference to the 1999 General Plan, the Zoning Ordinance, and the adopted Livingston Design Guidelines; and finds that, based on the evidence documented within the associated staff report and proceedings of the public hearing, the proposed uses in Phase 1 of the project are consistent with the General Plan, as conditioned, complies with the Zoning Ordinance in that the proposed use meets the zoning standards and requirements and is compatible with the surrounding uses, and meets the intent and guidance of the Livingston Design Guidelines; and
WHEREAS, the site for the proposed use is adequate in size and shape to accommodate said use and, as conditioned, all yards, spaces, wall and fences, parking, loading, landscaping, and other features required by the applicable zoning district are met; and WHEREAS, the site, as conditioned, for the proposed use is served by streets adequate to carry the quantity and kind of traffic generated by the proposed use; and Attachment 2
WHEREAS, public facilities, as conditioned, are currently adequate to serve the proposed use; and
WHEREAS, on August 9, 2022, the Livingston Planning Commission considered the environmental effects of the project and recommended to the City Council the adoption of a Mitigated Negative Declaration along with adoption of a Mitigated Monitoring/Reporting Program for the Moonglo Truck stop Complex.
NOW, THEREFORE, BE IT RESOLVED that the Livingston City Council adopts Resolution 2022- approving Conditional Use Permit 2020-02, with Conditions of Approval attached as Exhibits A and B to this City Council Resolution.
Passed and adopted this 6th day of September, 2022 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Juan Aguilar, Mayor
Of the City of Livingston
ATTEST:
I hereby certify that the foregoing resolution was regularly introduced, passed, and adopted at a regular meeting of the City Council of the City of Livingston this 6th day of September, 2022. ___________________________________
Leticia Vasquez-Zurita, City Clerk
Of the City of Livingston
Exhibit A
Conditions of Approval
1. The Developer shall comply with all federal, state and local laws, policies, standards and requirements applicable to this use and obtain a building permit and all other permits applicable to this use and shall pay all fees and exactions applicable to such a use; and
2. The Developer shall comply with all the conditions of the associated Site Plan and Design Review Permit 2020-02 Resolution of Approval; and
3. The Developer shall repair any damage to City facilities such as curb, gutter, sidewalk, streets and alleys caused by construction; and
4. The Developer shall indemnify, defend and hold harmless the City and its officials, officers, employees, agents, and consultants from any and all legal or administrative actions or other proceedings challenging this approval or any subsequent approval associated with this project; and
5. The development of the site shall be consistent with approved plans, elevations, and colors.
Provisions shall be made to accommodate bicycle parking. Minor variations from approved plans, elevations, and colors may be allowed at the review and approval of City staff; and
6. The developer and/or operator shall submit a signage plan for all exterior signs (including for each of the proposed quick service restaurants) for Planning administrative review and approval consistent with the submitted site plan and City’s signage regulations prior to obtaining a sign permit from the Building Division; and
7. The developer and/or operator shall submit final landscape plans for City staff review and approval, specifying plant selection, size and irrigation consistent with the preliminary landscape concept submitted as part of the application and described in the associated staff report and shall pay the landscape plan review and inspection fee to insure installation was done according to approved plans; Such plans shall be reviewed and approved by a Licensed Landscaped Architect for compliance with the City’s Water Efficiency Landscape Ordinance before a building permit can be issued and
8. All exterior lighting fixtures shall be noted on an exterior lighting plan subject to staff review and approval, and such lighting shall be shielded and directed to areas on the subject property itself and shall avoid shinning toward adjacent properties and State Route 99; and
9. The developer and/or operator shall comply with the 33 conditions listed in the Memo dated August 2, 2022, from City Engineer Mario Gouveia to Contract City Planner Miguel Galvez.
The time period for compliance with conditions 15, 16, and 17 as listed in the memo noted above shall be 7 years after the Certificate of Occupancy is issued for the convenience store/cashiers area; and
10. The Developer and/or operator shall submit the plans for the trash enclosures for City staff review and approval after access to the enclosures have been approved by Gilton Solid Waste Management; and
Attachment 2a
11. The Developer and/or operator shall keep the site free from trash and debris and shall maintain the premises in a clean and orderly manner; and
12. Before development of Phase 2 project components can be constructed, rezoning the property’s PF zoning and general plan designations will need to be rezoned to C-3, Service Highway Commercial shall be completed; and
13. Design and development of new storm water basin shall be as approved by the City Engineer. A new easement for the new storm water basin must be accepted by the City before the existing utility easement for the existing storm water basin can be abandoned.
14. The Developer and/or operator shall complete and record approved Lot Line Adjustment Application No. LLA 2020-02 before a building permit can be issued for development of the site.
15. The Developer shall include fire sprinklers in the development consistent with the requirements of the Merced County Fire Department and shall comply with other Fire Department requirements and standards including paying for, on a proportionate fair share basis, the cost for installing an OptiCom System at the Hammatt Avenue and Campbell Boulevard intersection.
16. Truck parking on Campbell Boulevard adjacent to the property shall be prohibited.
17. The Developer shall annex this Project site into the Community Facilities District (CFD) No. 2017-1 prior to the issuance of the Certificate of Occupancy, including payment of administrative costs associated with the annexation process.
18. Building permits are required and the project must conform to the California Code of Regulations, Title 24
The following Mitigation Measures were identified in the project’s initial study/Mitigated Negative Declaration and are hereby included as Conditions of Approval. Any proposed amendments to the following conditions will require amendment, review and approval of a new environmental assessment in compliance with the California Environmental Quality Act.
19. CULT-1 If any subsurface cultural resources are encountered during construction of the project, the City of Livingston Community Development Department shall be notified and all construction activities in the vicinity of the encounter shall be halted until a qualified archaeologist can examine these materials and determine their significance. If the find is determined to be significant, then the archaeologist shall recommend further mitigation measures that would reduce potential effects on the find to a level that is less than significant.
Recommended measures may include, but are not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The project developer shall be responsible for retaining qualified professionals, implementing recommended mitigation measures, and documenting mitigation efforts in a written report to the City’s Community Development Department, consistent with the requirements of the CEQA Guidelines.
20. CULT-2: If project construction encounters evidence of human burial or scattered human remains, the contractor shall immediately notify the County Coroner and the City, which shall in turn notify the appropriate tribal representatives. The City shall notify other federal and State agencies as required. The City will be responsible for compliance with the requirements of California Health and Safety Code Section 7050.5 and with any direction provided by the County Coroner. If the human remains are determined to be Native American, the County Coroner shall notify the Native American Heritage Commission, which will notify and appoint a Most Likely Descendant. The Most Likely Descendant shall work with the City and a qualified archaeologist to decide the proper treatment of the human remains and any associated funerary objects in accordance with California Public Resources Code Sections 5097.98 and 5097.991.
Avoidance is the preferred means of disposition of the burial resources.
21. GEO-1 Prior to commencement of construction activity, the developer shall prepare and implement a Storm Water Pollution Prevention Plan (SWPPP) for the project and file a Notice of Intent with the State Water Resources Control Board (SWRCB) in compliance with the Construction General Permit and City of Livingston storm water requirements. The SWPPP shall be available on the construction site at all times. The developer shall incorporate an Erosion Control Plan consistent with all applicable provisions of the SWPPP within the site improvement and building plans. The developer also shall submit the SWRCB Waste Discharger’s Identification Number to the City prior to approval of development or grading plans
22. GEO-2 If any subsurface paleontological resources are encountered during construction of the project, the City of Livingston Community Development Department shall be notified and all construction activities in the vicinity of the encounter shall be halted until a qualified paleontologist can examine these materials and determine their significance. If the find is determined to be significant, then the paleontologist shall recommend mitigation measures that would reduce potential effects on the find to a level that is less than significant. Recommended measures may include, but are not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The project developer shall be responsible for retaining qualified professionals, implementing recommended mitigation measures, and documenting mitigation efforts in a written report to the City’s Community Development Department, consistent with the requirements of the CEQA Guidelines.
23. HYDRO-1 The developer shall submit a Storm Water Quality Plan for the project that shall include post-construction Best Management Practices (BMPs) as required by the City’s Storm Water Management Program. The Storm Water Quality Plan shall be reviewed and approved by the City of Livingston Public Works Department prior to approval of project improvement plans.
24. HYDRO-2 If required, the developer shall execute a Maintenance Agreement with the City for storm water BMPs prior to receiving a Certificate of Occupancy. The developer shall remain the responsible party and provide funding for the operation, maintenance and replacement costs of the proposed treatment devices built for the project.
25. HYDRO-3 The developer shall comply with applicable requirements of, and pay all associated fees as required by, the City’s Storm Water Pollution Prevention Program as set forth in its NPDES Storm Water Permit.
26. TRANS-1 The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/Campbell Boulevard intersection.
27. TRANS-2: The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 southbound ramps. The project applicant or successors in interest shall be required to pay fair-share costs of preparing a preliminary Intersection Control Evaluation report to provide a screening assessment of the feasibility of a roundabout or traffic signal at the SR 99 ramps intersections.
28. TRANS-3 The project applicant or successors in interest shall be required to pay fair-share costs of the addition of an eastbound right-turn lane, approximately 200 feet in length, on Campbell Boulevard with right turn overlap phases on the northbound-to-eastbound and eastbound-tosouthbound movements.
29. TRANS-4 The project applicant or successors in interest shall install frontage improvements along Campbell Boulevard, including sidewalks, during Phase 1 development of the project site.
30. TRANS-5 Improvements to the Hammatt Avenue/ Campbell Boulevard intersection shall be designed to accommodate STAA trucks, and the project shall contribute its fair share to the cost of those features. Project access shall be designed to accommodate STAA trucks. Phase 1 shall contribute its fair share to the cost of a Caltrans STAA route designation application to be completed by the City and shall contribute its fair share to the cost of improvements needed to accommodate STAA trucks.
31. CUMUL-1 The project applicant or successors in interest shall be required to pay fair-share costs of improvements at the Hammatt Avenue/Campbell Boulevard intersection as described in Mitigation Measures TRANS-1 and TRANS-3, along with an addition of a westbound left-turn lane on Campbell Boulevard east of Hammatt Avenue, a conversion of the southbound right-turn lane to a through/right-turn lane, and the addition of a northbound-to-eastbound overlap phase.
32. CUMUL-2 The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 southbound ramps as described in Mitigation Measure TRANS-2, along with the construction of a southbound right-turn lane on Hammett Avenue that extends to Campbell Boulevard.
33. CUMUL-3 The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/F Street intersections.
34. CUMUL-4 The project applicant or successors in interest shall select and implement one of two alternatives related to traffic queuing at the western driveway: 1) Reconfiguration of the westbound Campbell Boulevard approach to allow left turns from two lanes. This change would equalize traffic volumes in each lane and reduce the queue lengths. This would require that the layout of the Hammatt Avenue/Campbell Boulevard intersection be wider to accommodate the concurrent turning paths of two STAA trucks. The project applicant or successors in interest shall be required to pay fair-share costs of improvements proposed by this alternative. 2) Left turns at the western driveway shall be prohibited. If determined to be needed by the City, the project proponents shall fund construction of a median treatment or other measure acceptable to the City to prohibit left turns.
Attachment 2b
GOUVEIA ENGINEERING
MEMORANDUM
TO:
FROM:
Miguel Galvez, Contract City Planne\ \ t I /
Mario B. Gouveia, City Engineer l'-)Bi µ,-~h-? r. f ' -tor I
SUBJECT: Engineering Review Comments for the SGM Moonglo, Inc. Truck Stop Complex (Phase 1) SPDR 2020-02 Application - REVISED
DATE: August 2, 2022
CC: Vanessa Portillo, City Manager
These are the Engineering review comments for the SGM Moonglo, Inc. Truck Stop Complex (Phase 1) in Livingston CA. The review comments are based on the revised site plan and accompanying drawings provided by the Applicant on July 26, 2022.
1. Provide improvement plans (separate from the building plans) for topography and demolition, street frontage improvements, site development, utilities, grading and drainage, landscaping, site lighting, erosion control, survey monuments and etc.
2. Public improvements shall conform to the latest edition of the City of Livingston Improvement Standards and all applicable State, Federal, and local laws and regulations.
3. Provide a soils report for project site prepared by a California registered geotechnical engineer.
4. Prepare a Storm Water Pollution Prevention Plan (SWPPP) pursuant to the California Water Resources Control Board Order No. 2009-0009-DWQ, NPDES No. CA000002 and the City of Livingston's MS4 Phase II Permit for construction activities. Prepare an Erosion Control Plan for storm water and construction BMPs. Applicant shall provide a WDID number prior to approval of the improvement plans.
5. Prepare volumetric sizing calculations, low development impact (LID) measures, operation and maintenance plan (O&M), and statement of responsibility agreement for storm water management pursuant to the City of Livingston's Post-Construction Standards Plan and pursuant to the City's Phase II MS4 Permit requirements.
6. Prepare a Dust Control Plan (DCP) and file the Plan with the San Joaquin Valley Air Pollution Control District for construction activities pursuant to Regulation VIII (Rules 8011-8081 ).
7. Prepare grading and encroachment permits for the project. Applicant shall pay the permit fee, plan check and inspection fees, and furnish improvement securities pursuant to the City's improvement standards, municipal code, and ordinances. The payment of permit fees shall be made as follows:
a. Deposit for review of improvement plans due at submittal of plans b. Deposit for project inspections due at issuance of grading and/or encroachment permits
8. Applicant shall pay all applicable development impact fees for Municipal Facilities, Police, Fire Protection, Streets and Bridges, Water, Domestic Wastewater, Storm Drainage, and Parks. 456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 Memorandum
Page2
9. Construct all connections for dry utilities underground and within the street right of way or other acceptable easements as approved by the respective utility companies.
10. Install a minimum new 10-inch water main on Campbell Boulevard for all proposed domestic, irrigation, and fire service connections. The new water line shall be connected to the existing 12-inch main on Hammatt Avenue and extended along Campbell Boulevard as required to make the project connections. Connections shall include water meters, backflow preventers, post indicator valves, and fire department connections as applicable, pursuant to City standards and as approved by the City Engineer.
11. Construct a minimum 10-inch water main to create a loop between Campbell Boulevard and Dwight Way as shown on the project site plan. Water lines constructed outside of the public rights of way shall be located within an easement acceptable to the City Engineer. Applicant shall cause the dedication of said easement to the City of Livingston.
12. Install a 12-inch sewer main on Campbell Boulevard for all proposed connections for sanitary service and other allowable waste discharges or construct improvements as shown on the project site plan and accompanying drawings pursuant to City standards and as approved by the City Engineer. The new sewer line shall be extended along Campbell Boulevard as required to make the project connections and extended to the nearest property line for all other parcels with street frontage limited to Campbell Boulevard and within the limits of the project. Provide a grease interceptor at all on site kitchen connections.
13. Connect the sewer main on Campbell Boulevard to the existing gravity sewer main on Dwight Way with a 12-inch sewer main as shown on the project site plan. Developer to submit hydraulic calculations to verify there is adequate capacity on the existing line to handle the additional project wastewater flows. Sewer lines constructed outside of the public rights of way shall be located within an easement acceptable to the City Engineer. Applicant shall cause the dedication of said easement to the City of Livingston.
14. Construct septage receiving station pursuant to City standards and as approved by the City Engineer.
Applicant shall apply for a City Industrial Wastewater Permit for septage discharges to the sanitary sewer system. All discharges from the septage receiving station shall be metered.
15. Design and construct the proposed storm basin per the City standards, soils investigation report, and as approved by the City Engineer and Merced Irrigation District. The basin shall collect storm runoff from street frontage improvements and on-site areas and sized to handle storm runoff from the project site, tributary area(s) for existing basin, and any planned future development. Applicant shall grant and cause the dedication of an easement to the City of Livingston for disposal of street runoff unto the private storm basin.
16. Backfill existing basin, disconnect and extend existing storm pipes along Campbell Boulevard to the new basin on the southeast comer of the project site. The new storm drain line shall be sized to handle storm runoff from street frontage, on-site areas, and existing basin tributary area based on hydraulic calculations, pursuant to City standards and as approved by the City Engineer. Provide sand oil separator for all surface runoff from parking lots, fueling areas, and drive isles.
17. Dedicate street right of way and 10-ft public utility easement for the south half of Campbell Boulevard and construct street improvements pursuant to Arterial Standards (110-ft divided 4-Lane) or as approved by the City Engineer. Applicant shall dedicate the right of way using a street alignment for Campbell Boulevard that does not affect existing developed parcels within the impacted roadway segment. Roadway pavement shall be widen to ultimate street width within the project 456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 Memorandum
frontage and transitioned to existing pavement as required. Curb, gutter, sidewalk, street lighting, street landscaping, and other required street frontage improvements shall extend the length of the property line. Construct all required frontage improvements per City standards or as approved by the City Engineer.
18. Dedicate street right of way for the north half of Campbell Boulevard pursuant to Arterial Standards ( 110-ft divided 4-Lane) as proposed by the Applicant on the project site plan and accompanying drawings. Applicant shall dedicate the right of way using a street alignment for Campbell Boulevard that does not affect existing developed parcels within the impacted roadway segment.
19. Construct street frontage improvements on Campbell Boulevard to match the intersection improvements for Campbell Boulevard and Hammatt A venue being designed and constructed by others. Applicant shall cause the dedication of street right of way for Campbell Boulevard and Hammatt A venue as necessary for said intersection improvements.
20. The Applicant would be responsible for constructing the street widening improvements on the west half of Hammatt A venue between the State Route 99 northbound on-ramp and the intersection of Hammatt A venue and Campbell Boulevard. These widening improvements are being triggered by the project's traffic impacts but they're already scheduled for construction by the City of Livingston using separate funding. Therefore, the Hammatt A venue widening improvements are not required to be completed by the Developer.
21. The Applicant is responsible for constructing any street widening improvements on the north half of Campbell Boulevard that are triggered by the project's traffic impacts for turning movements at the intersections of Hammatt Avenue and Industrial Drive.
22. The proposed most western driveway on Campbell Boulevard shall be restricted to right-in and rightout vehicle movements. Applicant shall construct a raised center median on Campbell Boulevard to prevent left tum movements from said driveway.
23. Construct the proposed second driveway from the west to align with the intersection of Industrial Drive as shown on the project site plan and as approved by the City Engineer.
24. Construct all other street improvements and provide site ingress/egress as recommended by the project's Transportation Impact Analysis prepared by KDA & Associates dated July 24, 2020 and all other amendments thereto.
25. Applicant shall prepare and submit to Caltrans an STAA Route Designation Application for Hammatt and Campbell Boulevard on behalf of the City of Livingston and at the sole cost of the Applicant.
Both streets shall be designated STAA routes prior to the issuance of a certificate of occupancy by the City of Livingston.
26. Applicant shall address any other requirements for street improvements and site access provided by Caltrans as part of their review and approval for this project, except for the requirements for the street widening improvements for the west half of Hammatt A venue being completed by the City of Livingston.
27. Pay maximum fair share of 31 % or minimum 14% at the City's discretion for intersection improvements at Hammatt Avenue and Campbell Boulevard to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by the City Engineer and pursuant to City standards.
456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 Memorandum
Page4
28. Pay maximum fair share of 27% or minimum 10% at the City's discretion for intersection improvements at Hammatt Avenue and SR 99 Northbound Ramps to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by Caltrans and the City Engineer and pursuant to Caltrans/City standards.
29. Pay maximum fair share of 21 % or minimum 7% at the City's discretion for intersection improvements at Hammatt Avenue and SR 99 Southbound Ramps to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by Caltrans and the City Engineer and pursuant to Caltrans/City standards.
30. Pay maximum fair share of 11 % or minimum 3% at the City's discretion for intersection improvements at Hammatt Avenue and F Street to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by the City Engineer and pursuant to City standards.
31. Provide on-site and off-site ADA accessible path for pedestrians and bicyclists.
32. Provide access to the trash enclosure as approved by the City Planner and the City's Refuse Contractor.
33. Protect from damage all existing street improvements designated to remain in place. 456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 RESOLUTION 2022-
RESOLUTION OF THE CITY OF LIVINGSTON CITY COUNCIL
APPROVING THE SITE PLAN AND DESIGN REVIEW 2020-02 FOR THE SGM MOONGLO
TRUCK STOP COMPLEX AT THE SOUTHEAST CORNER OF CAMPBELL BOULEVARD
AND HAMMATT AVENUE
(APN NOS. 023-070-012, 023-070-013, 023-070-014, and 023-060-010), WHEREAS, pursuant to Livingston Municipal Code (“LMC”) section 5-6-7, Rod Hawkins of Hawkins and Associates Engineering Inc., on behalf of SGM Moonglo, Inc., Property Owners, applied for a Site Plan and Design Review application for the development of a Truck Travel Center that includes five quick serve restaurants, three with a drive-thru, fuel dispensing stations for passenger and tractor trailer vehicles and associated travel center facilities, at the southeast corner of Campbell Boulevard and Hammatt Ave, (APN Nos. 023-070-012, 023-070-013, 023-070-014, and 023-060-010), in the City of Livingston; and
WHEREAS, the site is zoned C-3 (Highway Service Commercial) and PF, Public or Quasi Public Facilities , and has General Plan designation of Highway Commercial, Service Commercial and Public Facility according to the official zoning map of the City of Livingston and the 1999 Livingston General Plan; and
WHEREAS, LMC Section 5-6-7 requires the approval of a Site Plan and Design Review for new structures within the C-3 district to assure compatibility, harmony in appearance in neighborhoods, reduction of negative impacts of nonaesthetic development, and orderly development of the community; and
WHEREAS, a public hearing for the proposed project has been properly noticed by posting, a newspaper ad and a mailing to adjacent properties within 300 feet of the site; and WHEREAS, Staff has reviewed the project with reference to the 1999 General Plan, the Zoning Ordinance (specifically Sections 5-6-7 “C” thru “E”) and the adopted Livingston Design Guidelines; and finds that, based on the evidence documented within the associated staff report and proceedings of the public hearing, the proposed use in Phase 1, its site plan and design, is consistent with the General Plan, complies with the Zoning Ordinance in that the site plan and design meets the zoning standard and requirements (including those specifically referenced above), and meets the intent and guidance of the Livingston Design Guidelines; and
WHEREAS, on August 9, 2022, the Livingston Planning Commission considered the environmental effects of the project and recommended to the City Council the adoption of a Mitigated Negative Declaration along with adoption of a Mitigated Monitoring/Reporting Program for the Moonglo Truck stop Complex.
NOW, THEREFORE, BE IT RESOLVED that the Livingston City Council adopts Resolution 2022- approving the Site Plan and Design Review 2020-02 – SGM Moonglo Truck Stop Complex, with Conditions of Approval attached as Exhibits “A” and “B” to this City Council Resolution.
Attachment 3
Passed and adopted this 6th day of September, 2022 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Juan Aguilar, Mayor
Of the City of Livingston
ATTEST:
I hereby certify that the foregoing resolution was regularly introduced, passed, and adopted at a regular meeting of the City Council of the City of Livingston this 6th day of September, 2022. ___________________________________
Leticia Vasquez-Zurita, City Clerk
Of the City of Livingston
Exhibit A
Conditions of Approval
1. The Developer shall comply with all federal, state and local laws, policies, standards and requirements applicable to this use and obtain a building permit and all other permits applicable to this use and shall pay all fees and exactions applicable to such a use; and
2. The Developer shall comply with all the conditions of the associated Conditional Use Permit 2020-02 Resolution of Approval; and
3. The Developer shall repair any damage to City facilities such as curb, gutter, sidewalk, streets and alleys caused by construction; and
4. The Developer shall indemnify, defend and hold harmless the City and its officials, officers, employees, agents, and consultants from any and all legal or administrative actions or other proceedings challenging this approval or any subsequent approval associated with this project; and
5. The development of the site shall be consistent with approved plans, elevations, and colors.
Provisions shall be made to accommodate bicycle parking. Minor variations from approved plans, elevations, and colors may be allowed at the review and approval of City staff; and
6. The developer and/or operator shall submit a signage plan for all exterior signs (including for each of the proposed quick service restaurants) for Planning administrative review and approval consistent with the submitted site plan and City’s signage regulations prior to obtaining a sign permit from the Building Division; and
7. The developer and/or operator shall submit final landscape plans for City staff review and approval, specifying plant selection, size and irrigation consistent with the preliminary landscape concept submitted as part of the application and described in the associated staff report and shall pay the landscape plan review and inspection fee to insure installation was done according to approved plans; Such plans shall be reviewed and approved by a Licensed Landscaped Architect for compliance with the City’s Water Efficiency Landscape Ordinance before a building permit can be issued and
8. All exterior lighting fixtures shall be noted on an exterior lighting plan subject to staff review and approval, and such lighting shall be shielded and directed to areas on the subject property itself and shall avoid shinning toward adjacent properties and State Route 99; and
9. The developer and/or operator shall comply with the 33 conditions listed in the Memo dated August 2, 2022, from City Engineer Mario Gouveia to Contract City Planner Miguel Galvez. The time period for compliance with conditions 15, 16, and 17 as listed in the memo noted above shall be 7 years after the Certificate of Occupancy is issued for the convenience store/cashiers area; and
10. The Developer and/or operator shall submit the plans for the trash enclosures for City staff review and approval after access to the enclosures have been approved by Gilton Solid Waste Management; and
Attachment 3a
11. The Developer and/or operator shall keep the site free from trash and debris and shall maintain the premises in a clean and orderly manner; and
12. Before development of Phase 2 project components can be constructed, rezoning the property’s PF zoning and general plan designations will need to be rezoned to C-3, Service Highway Commercial shall be completed; and
13. Design and development of new storm water basin shall be as approved by the City Engineer. A new easement for the new storm water basin must be accepted by the City before the existing utility easement for the existing storm water basin can be abandoned.
14. The Developer and/or operator shall complete and record approved Lot Line Adjustment Application No. LLA 2020-02 before a building permit can be issued for development of the site.
15. The Developer shall include fire sprinklers in the development consistent with the requirements of the Merced County Fire Department and shall comply with other Fire Department requirements and standards including paying for, on a proportionate fair share basis, the cost for installing an OptiCom System at the Hammatt Avenue and Campbell Boulevard intersection.
16. Truck parking on Campbell Boulevard adjacent to the property shall be prohibited.
17. The Developer shall annex this Project site into the Community Facilities District (CFD) No. 2017-1 prior to the issuance of the Certificate of Occupancy, including payment of administrative costs associated with the annexation process.
18. Building permits are required and the project must conform to the California Code of Regulations, Title 24
The following Mitigation Measures were identified in the project’s initial study/Mitigated Negative Declaration and are hereby included as Conditions of Approval. Any proposed amendments to the following conditions will require amendment, review and approval of a new environmental assessment in compliance with the California Environmental Quality Act.
19. CULT-1 If any subsurface cultural resources are encountered during construction of the project, the City of Livingston Community Development Department shall be notified and all construction activities in the vicinity of the encounter shall be halted until a qualified archaeologist can examine these materials and determine their significance. If the find is determined to be significant, then the archaeologist shall recommend further mitigation measures that would reduce potential effects on the find to a level that is less than significant.
Recommended measures may include, but are not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The project developer shall be responsible for retaining qualified professionals, implementing recommended mitigation measures, and documenting mitigation efforts in a written report to the City’s Community Development Department, consistent with the requirements of the CEQA Guidelines.
20. CULT-2: If project construction encounters evidence of human burial or scattered human remains, the contractor shall immediately notify the County Coroner and the City, which shall in turn notify the appropriate tribal representatives. The City shall notify other federal and State agencies as required. The City will be responsible for compliance with the requirements of California Health and Safety Code Section 7050.5 and with any direction provided by the County Coroner. If the human remains are determined to be Native American, the County Coroner shall notify the Native American Heritage Commission, which will notify and appoint a Most Likely Descendant. The Most Likely Descendant shall work with the City and a qualified archaeologist to decide the proper treatment of the human remains and any associated funerary objects in accordance with California Public Resources Code Sections 5097.98 and 5097.991.
Avoidance is the preferred means of disposition of the burial resources.
21. GEO-1 Prior to commencement of construction activity, the developer shall prepare and implement a Storm Water Pollution Prevention Plan (SWPPP) for the project and file a Notice of Intent with the State Water Resources Control Board (SWRCB) in compliance with the Construction General Permit and City of Livingston storm water requirements. The SWPPP shall be available on the construction site at all times. The developer shall incorporate an Erosion Control Plan consistent with all applicable provisions of the SWPPP within the site improvement and building plans. The developer also shall submit the SWRCB Waste Discharger’s Identification Number to the City prior to approval of development or grading plans
22. GEO-2 If any subsurface paleontological resources are encountered during construction of the project, the City of Livingston Community Development Department shall be notified and all construction activities in the vicinity of the encounter shall be halted until a qualified paleontologist can examine these materials and determine their significance. If the find is determined to be significant, then the paleontologist shall recommend mitigation measures that would reduce potential effects on the find to a level that is less than significant. Recommended measures may include, but are not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The project developer shall be responsible for retaining qualified professionals, implementing recommended mitigation measures, and documenting mitigation efforts in a written report to the City’s Community Development Department, consistent with the requirements of the CEQA Guidelines.
23. HYDRO-1 The developer shall submit a Storm Water Quality Plan for the project that shall include post-construction Best Management Practices (BMPs) as required by the City’s Storm Water Management Program. The Storm Water Quality Plan shall be reviewed and approved by the City of Livingston Public Works Department prior to approval of project improvement plans.
24. HYDRO-2 If required, the developer shall execute a Maintenance Agreement with the City for storm water BMPs prior to receiving a Certificate of Occupancy. The developer shall remain the responsible party and provide funding for the operation, maintenance and replacement costs of the proposed treatment devices built for the project.
25. HYDRO-3 The developer shall comply with applicable requirements of, and pay all associated fees as required by, the City’s Storm Water Pollution Prevention Program as set forth in its NPDES Storm Water Permit.
26. TRANS-1 The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/Campbell Boulevard intersection.
27. TRANS-2: The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 southbound ramps. The project applicant or successors in interest shall be required to pay fair-share costs of preparing a preliminary Intersection Control Evaluation report to provide a screening assessment of the feasibility of a roundabout or traffic signal at the SR 99 ramps intersections.
28. TRANS-3 The project applicant or successors in interest shall be required to pay fair-share costs of the addition of an eastbound right-turn lane, approximately 200 feet in length, on Campbell Boulevard with right turn overlap phases on the northbound-to-eastbound and eastbound-tosouthbound movements.
29. TRANS-4 The project applicant or successors in interest shall install frontage improvements along Campbell Boulevard, including sidewalks, during Phase 1 development of the project site.
30. TRANS-5 Improvements to the Hammatt Avenue/ Campbell Boulevard intersection shall be designed to accommodate STAA trucks, and the project shall contribute its fair share to the cost of those features. Project access shall be designed to accommodate STAA trucks. Phase 1 shall contribute its fair share to the cost of a Caltrans STAA route designation application to be completed by the City and shall contribute its fair share to the cost of improvements needed to accommodate STAA trucks.
31. CUMUL-1 The project applicant or successors in interest shall be required to pay fair-share costs of improvements at the Hammatt Avenue/Campbell Boulevard intersection as described in Mitigation Measures TRANS-1 and TRANS-3, along with an addition of a westbound left-turn lane on Campbell Boulevard east of Hammatt Avenue, a conversion of the southbound right-turn lane to a through/right-turn lane, and the addition of a northbound-to-eastbound overlap phase.
32. CUMUL-2 The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 southbound ramps as described in Mitigation Measure TRANS-2, along with the construction of a southbound right-turn lane on Hammett Avenue that extends to Campbell Boulevard.
33. CUMUL-3 The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/F Street intersections.
34. CUMUL-4 The project applicant or successors in interest shall select and implement one of two alternatives related to traffic queuing at the western driveway: 1) Reconfiguration of the westbound Campbell Boulevard approach to allow left turns from two lanes. This change would equalize traffic volumes in each lane and reduce the queue lengths. This would require that the layout of the Hammatt Avenue/Campbell Boulevard intersection be wider to accommodate the concurrent turning paths of two STAA trucks. The project applicant or successors in interest shall be required to pay fair-share costs of improvements proposed by this alternative. 2) Left turns at the western driveway shall be prohibited. If determined to be needed by the City, the project proponents shall fund construction of a median treatment or other measure acceptable to the City to prohibit left turns.
Attachment 3b
GOUVEIA ENGINEERING
MEMORANDUM
TO:
FROM:
Miguel Galvez, Contract City Planne\ \ t I /
Mario B. Gouveia, City Engineer l'-)Bi µ,-~h-? r. f ' -tor I
SUBJECT: Engineering Review Comments for the SGM Moonglo, Inc. Truck Stop Complex (Phase 1) SPDR 2020-02 Application - REVISED
DATE: August 2, 2022
CC: Vanessa Portillo, City Manager
These are the Engineering review comments for the SGM Moonglo, Inc. Truck Stop Complex (Phase 1) in Livingston CA. The review comments are based on the revised site plan and accompanying drawings provided by the Applicant on July 26, 2022.
1. Provide improvement plans (separate from the building plans) for topography and demolition, street frontage improvements, site development, utilities, grading and drainage, landscaping, site lighting, erosion control, survey monuments and etc.
2. Public improvements shall conform to the latest edition of the City of Livingston Improvement Standards and all applicable State, Federal, and local laws and regulations.
3. Provide a soils report for project site prepared by a California registered geotechnical engineer.
4. Prepare a Storm Water Pollution Prevention Plan (SWPPP) pursuant to the California Water Resources Control Board Order No. 2009-0009-DWQ, NPDES No. CA000002 and the City of Livingston's MS4 Phase II Permit for construction activities. Prepare an Erosion Control Plan for storm water and construction BMPs. Applicant shall provide a WDID number prior to approval of the improvement plans.
5. Prepare volumetric sizing calculations, low development impact (LID) measures, operation and maintenance plan (O&M), and statement of responsibility agreement for storm water management pursuant to the City of Livingston's Post-Construction Standards Plan and pursuant to the City's Phase II MS4 Permit requirements.
6. Prepare a Dust Control Plan (DCP) and file the Plan with the San Joaquin Valley Air Pollution Control District for construction activities pursuant to Regulation VIII (Rules 8011-8081 ).
7. Prepare grading and encroachment permits for the project. Applicant shall pay the permit fee, plan check and inspection fees, and furnish improvement securities pursuant to the City's improvement standards, municipal code, and ordinances. The payment of permit fees shall be made as follows:
a. Deposit for review of improvement plans due at submittal of plans b. Deposit for project inspections due at issuance of grading and/or encroachment permits
8. Applicant shall pay all applicable development impact fees for Municipal Facilities, Police, Fire Protection, Streets and Bridges, Water, Domestic Wastewater, Storm Drainage, and Parks. 456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 Memorandum
Page2
9. Construct all connections for dry utilities underground and within the street right of way or other acceptable easements as approved by the respective utility companies.
10. Install a minimum new 10-inch water main on Campbell Boulevard for all proposed domestic, irrigation, and fire service connections. The new water line shall be connected to the existing 12-inch main on Hammatt Avenue and extended along Campbell Boulevard as required to make the project connections. Connections shall include water meters, backflow preventers, post indicator valves, and fire department connections as applicable, pursuant to City standards and as approved by the City Engineer.
11. Construct a minimum 10-inch water main to create a loop between Campbell Boulevard and Dwight Way as shown on the project site plan. Water lines constructed outside of the public rights of way shall be located within an easement acceptable to the City Engineer. Applicant shall cause the dedication of said easement to the City of Livingston.
12. Install a 12-inch sewer main on Campbell Boulevard for all proposed connections for sanitary service and other allowable waste discharges or construct improvements as shown on the project site plan and accompanying drawings pursuant to City standards and as approved by the City Engineer. The new sewer line shall be extended along Campbell Boulevard as required to make the project connections and extended to the nearest property line for all other parcels with street frontage limited to Campbell Boulevard and within the limits of the project. Provide a grease interceptor at all on site kitchen connections.
13. Connect the sewer main on Campbell Boulevard to the existing gravity sewer main on Dwight Way with a 12-inch sewer main as shown on the project site plan. Developer to submit hydraulic calculations to verify there is adequate capacity on the existing line to handle the additional project wastewater flows. Sewer lines constructed outside of the public rights of way shall be located within an easement acceptable to the City Engineer. Applicant shall cause the dedication of said easement to the City of Livingston.
14. Construct septage receiving station pursuant to City standards and as approved by the City Engineer.
Applicant shall apply for a City Industrial Wastewater Permit for septage discharges to the sanitary sewer system. All discharges from the septage receiving station shall be metered.
15. Design and construct the proposed storm basin per the City standards, soils investigation report, and as approved by the City Engineer and Merced Irrigation District. The basin shall collect storm runoff from street frontage improvements and on-site areas and sized to handle storm runoff from the project site, tributary area(s) for existing basin, and any planned future development. Applicant shall grant and cause the dedication of an easement to the City of Livingston for disposal of street runoff unto the private storm basin.
16. Backfill existing basin, disconnect and extend existing storm pipes along Campbell Boulevard to the new basin on the southeast comer of the project site. The new storm drain line shall be sized to handle storm runoff from street frontage, on-site areas, and existing basin tributary area based on hydraulic calculations, pursuant to City standards and as approved by the City Engineer. Provide sand oil separator for all surface runoff from parking lots, fueling areas, and drive isles.
17. Dedicate street right of way and 10-ft public utility easement for the south half of Campbell Boulevard and construct street improvements pursuant to Arterial Standards (110-ft divided 4-Lane) or as approved by the City Engineer. Applicant shall dedicate the right of way using a street alignment for Campbell Boulevard that does not affect existing developed parcels within the impacted roadway segment. Roadway pavement shall be widen to ultimate street width within the project 456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 Memorandum
frontage and transitioned to existing pavement as required. Curb, gutter, sidewalk, street lighting, street landscaping, and other required street frontage improvements shall extend the length of the property line. Construct all required frontage improvements per City standards or as approved by the City Engineer.
18. Dedicate street right of way for the north half of Campbell Boulevard pursuant to Arterial Standards ( 110-ft divided 4-Lane) as proposed by the Applicant on the project site plan and accompanying drawings. Applicant shall dedicate the right of way using a street alignment for Campbell Boulevard that does not affect existing developed parcels within the impacted roadway segment.
19. Construct street frontage improvements on Campbell Boulevard to match the intersection improvements for Campbell Boulevard and Hammatt A venue being designed and constructed by others. Applicant shall cause the dedication of street right of way for Campbell Boulevard and Hammatt A venue as necessary for said intersection improvements.
20. The Applicant would be responsible for constructing the street widening improvements on the west half of Hammatt A venue between the State Route 99 northbound on-ramp and the intersection of Hammatt A venue and Campbell Boulevard. These widening improvements are being triggered by the project's traffic impacts but they're already scheduled for construction by the City of Livingston using separate funding. Therefore, the Hammatt A venue widening improvements are not required to be completed by the Developer.
21. The Applicant is responsible for constructing any street widening improvements on the north half of Campbell Boulevard that are triggered by the project's traffic impacts for turning movements at the intersections of Hammatt Avenue and Industrial Drive.
22. The proposed most western driveway on Campbell Boulevard shall be restricted to right-in and rightout vehicle movements. Applicant shall construct a raised center median on Campbell Boulevard to prevent left tum movements from said driveway.
23. Construct the proposed second driveway from the west to align with the intersection of Industrial Drive as shown on the project site plan and as approved by the City Engineer.
24. Construct all other street improvements and provide site ingress/egress as recommended by the project's Transportation Impact Analysis prepared by KDA & Associates dated July 24, 2020 and all other amendments thereto.
25. Applicant shall prepare and submit to Caltrans an STAA Route Designation Application for Hammatt and Campbell Boulevard on behalf of the City of Livingston and at the sole cost of the Applicant.
Both streets shall be designated STAA routes prior to the issuance of a certificate of occupancy by the City of Livingston.
26. Applicant shall address any other requirements for street improvements and site access provided by Caltrans as part of their review and approval for this project, except for the requirements for the street widening improvements for the west half of Hammatt A venue being completed by the City of Livingston.
27. Pay maximum fair share of 31 % or minimum 14% at the City's discretion for intersection improvements at Hammatt Avenue and Campbell Boulevard to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by the City Engineer and pursuant to City standards.
456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 Memorandum
Page4
28. Pay maximum fair share of 27% or minimum 10% at the City's discretion for intersection improvements at Hammatt Avenue and SR 99 Northbound Ramps to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by Caltrans and the City Engineer and pursuant to Caltrans/City standards.
29. Pay maximum fair share of 21 % or minimum 7% at the City's discretion for intersection improvements at Hammatt Avenue and SR 99 Southbound Ramps to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by Caltrans and the City Engineer and pursuant to Caltrans/City standards.
30. Pay maximum fair share of 11 % or minimum 3% at the City's discretion for intersection improvements at Hammatt Avenue and F Street to mitigate the traffic impacts per the project's Transportation Impact Analysis. The intersection improvements to include the required roadway configuration/traffic signal layout as approved by the City Engineer and pursuant to City standards.
31. Provide on-site and off-site ADA accessible path for pedestrians and bicyclists.
32. Provide access to the trash enclosure as approved by the City Planner and the City's Refuse Contractor.
33. Protect from damage all existing street improvements designated to remain in place. 456 SIXTH STREET• GUSTINE, CALIFORNIA 95322 • TELEPHONE (209) 854-3300 • FAX (209) 854-3600 Project Location & Vicinity Map
Attachment 4
r
,.
F St
Alameda Ct
I /
,-
, r
I
I
I I
''
! [
:~ l ~ ~ 3 .__L......L.._L_LJ_[_LLJ.. <{ •
I [.'..ill~" '.
I l
Ii or---r----
Attachment 5
Site Plan/Design Review 2020-02
& CUP 2020-02
Moonglo Trucking
General Plan: (PF) Public Facility; (HC) Highway
Commercial & (SC) Service Commercial
APN’s: 023-060-010; 023-070-012; 023-070-013
Attachment 6
Site Plan/Design Review 2020-02
& CUP 2020-02
Moonglo Trucking
Zoning: (PF) Public Facility &
(C-3) Highway Service Commercial
APN’s: 023-060-010; 023-070-012; 023-070-013 I I I I I I I I I I I I I I I I I I I I I Etttfo --
=m
nrn:c nrn!!l
II[[l I •
8.TI::f_.§.1.
,
•/}7~1,l 4of
~
.,.._o;
~~rA"ffi
•
,,
,,
\
\
\
,,,,
,,
,,
\
\
\
\
\
,,
,,
\
\
\
\
\
\
\
\
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,, \
\
\
\
\
\
PLANNING EXHIBITS FOR:
-
CAMPBELL BL VD, LIVINGSTON, CA 95334
\
\
• I
I
I
I
I
I
I
I
I
I
I
I
I •
Q;:j
~
........... ·--
----
\
\
\
\
\
\
\
•
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
•
\
\
\
\
\
\
----~~~::::--
'. SEE SHEET C4
..
\
\
"
\
\ •
---
---
..
,,
,,
I
,,
,,
,,
,,
,,
,,
•
•
,,
,,
I
,,
,,
,,
,,
,,
,,
,,
,,
•
80 0 -'O BO 160
I. - I 1_1--1
SCALE: 1•= 60'
\
\
\
\
\
\
.. --
\
\
\
\
\
\
\
\
\
\
OWNER
SGM MOONGLO INC.
CONTACT: GOLDY SINGH
2120 POND BRANCH ROAD
GILBERT, CA 29054
PHONE: (803) 657-5535
\
\
\
\
DSTREET
FSTREET
LIVINGSTON, CA
VICINITY MAP
NTS
INDEX
Cl OVERALL SITE PLAN
C2 EXISTING TOPOGRAPHY PLAN
C3 ENLARGED SITE PLAN
C4 ENLARGED SITE PLAN
C5 ENLARGED SITE PLAN
C6 COMPOSITE UTILITY PLAN
,
I
I
I
I
I
I
I
\
' '
\ ' \\ ' ' ' ' ' ' ' ' ' '
'
'
'
'
'
'
-------,- ,
,
\ I --- CAMPBELL A VENUE - ---::_ ---:-.r ;: ---- 0 c, <:J Cl \ o'='':,.~- I
I
I
I
--
iJH~IGn°Hii"W~A~Y:-;9;;;-9-::-:N;:::O~R::::TH:-::--B-O_U_ND._1 - - - - - - - - - - - - ~ SEE SHEET cs I- - - - - - - - - - - - - - - - .J [HIGHWAY 99 SOUTH BOUND]
RAILROAD
\J
BY: MTS
-"'"'-"-----
CHK: ~~--RHB
DATE: 2020-09-11
~
<
t--------~
!
~
:::
1-,:D;:::A:_:;TE::;;•: =====-I;! ~ SHEET
Cl
OF
6 '.3-•
,
•
~ b
Th
~ '
cd
! ------------------------------------------------------------------------------------------------------------------------------------------------34-86, ________ _)
I
I
I
I
I
I
I
I
£XJSTINC CAL TRANS
F£NC£ TO RCMAIN
£XJS11NC STOll/ol DRAIN BASIN
APPROXIIJATF CAPAOTY 164.~0
CUBIC FEET. 8ASN TO 8£
R£LOCA TED 5££ 91'£ PLAN.
,-s •"
+
,-s •"'
+
A.P.N. ~ 023-07-13
2019--010797, M.C.R.
.'o
,-s
+
,-s •"
+
,• ,-s
+
FD. h2 HIJIJ/TACK
IN MONWCNT ȣLL..
NO /?£CORD
+
,,.,. •
+'
,,,,
,,,
+
+
'
'
'
I
I
I
I
I
I
I
I
1'..," I +
552'48'25 "F
L=79.16'
':\- J
•,
,,½l
+' I
,":i'"o, '
• I
I
I
1-
l~
+l!!f!
1!!1 ~
ii:sl
I~
420 INDUSTRIAL
I
I
I
DRIVE,LLC
A.P.N. 023-06--07 CITY OF
LIVTNGSTON I
I /
I-- - . - - . ___,
: I ~ -------:
I . L ___ J
I
I I
~- -- ~
. r---
1 L I ____ _
I I
A.P.N. 023-06--08
.'>2"1c'·~ ~'"""-~ --·--PR/POSED ______ _) _____ -------~~;;~;2~54.95 ____ ----·------·---------~- ---- ---- --7 Fl!GHT-OF-WAY
,,,
,-s
+
R=1089.56'
t.-22V9'38"
'- L•421.42'
.,,
\ \ ~~--
' < .. ~~~
\
~"'''b. ~~ ..
\ '
\ \ £XJSTINC
'\ ~ RIQIT-OF-WA Y
I \ \ PROPOSlD
\ \ \~RIGHT-OF-WAY
CXJ!;TING ~--~:"-
RIGHT-OF-WAY
PROPOS£D
RIC,H T-OF -WA Y
R=1089.56'
IF12'18'18"
L=2J4.00'
SGM-MOONGLO, INC.,
A SOUTH CAROLINA
CORPORATION
A.P.N. 023-06-10
2018-0024013,
M.C.R25.61
ACRES±
FD. J/4- IP LS 7788,
7J-OP-05
SGM-MOONGW,
INC., A SOUTH
CAROLINA
CORPORATION
A.P.N. 023-06-09
2018-0024013, M.C.R
\:
~ ----------- N89'54'41T 260.00'
I
:--·----1
~-----~
1------~
: ________ J
I --.--- . - - . ___,
L-------+---·--·---'
L ________ J
·--·-+·--·-
/
~-- _, --- ...J - __ .,
I
I I ---------------- 1
I
I I I
r- - ·--· - ..l._ - ·--·-,
I
I
I
L__ --·- ·--·------1
I I
I
I
,-·---, --·-- i
I
L-.
L-.
L.
r-- -
L- ..
- . I
FD. T"IP CA 001
J6-RS-19
FD. 2x2 HUB/TACK
IN IJOMJl,lfNT
f'ELL. NO RECORD
FD. J/4" IP LS 7788,
7.J-OP-05 ~ '-----_ i ~ -= __,_; = -_) j_ ~
£)(JS11NG CAL TRANS
ffNCC 10 R£UAIN
"" • ,-s"' " ' ,-s ,-s + I + + \!!
I _
_.., ... ~...,, \
I 'i..:
--;:.
A.P.N. 023--07-14
2019--010797, M.C.R.
I
I "' :'I' + .
I
I
FD. tiP CA DOT
.16-RS-19
•• + ' " ~",-
+
DOST/NC CAL TRANS
F£NC£ TO REMAIN
CAUTION: UTILITY LOCATION NOTES
,,,
+'
,. EXISTING IJNOERGROUNO Ulll.111£S AR£ SHOWN AS THEY AR£ 8£UEV£D TO cxrsr. TH£ LOCA l10NS SHO"1t AR£ BASED ON RfCCJRD JNF~TJON. PROWJED BY 01HER5, Al,/() BY F1£LD LOCA1'0N OF 5t.Jl?FAC£ FEATURES. 11-115 JNFORMA~ 15 PRQWJEO ONLY AS AN A/0 TO THE CONTRACTOR. rnEREFORE, rn£ OWNER AND ENGINEER CANNOT ACCEPT R£5PONSIBII.JTY FOR THE LOCATION AND/OR OE5JGNATION OF EXISTING UNDERGROUND FAQUrr£5. PRIOR TO CfNIICNCING WORK 1H£ CONTRACTOR SHALL HA\£ CAOI UT1LITY COUPANY ACCURAll'LY LOCATE rN THC F1£l.D TffDR UA1NS AND 5£RVIC£ UNES. CONTRACTOR 5HAJ..L VER/f'Y LOCATION (BOTH Vf.RTICAJ..
AND HORIZONTAL} OF ALL £XIST1NG UND£RGllOfJND FAC/Lffl£S AND NOTIFY fNGIN££R OF ANY OISCR£PANC/fS OR CONFLICTS. IT SHALL 8£ THE CONTRACTOR'S RESFUVSIBIL/TY TO PR07ECT ALL EXIST1NG UTIL/11£S. SO THAT NO DANACC RESUl. TS ro 1H£M OURINC 1HE PERFORUANCE OF HIS HCW1<. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION 1HE CCNTRACTOR SHALL CONTACT U.SA AT 1-800-227-2600. 1FST UN£ OF TEXT
2. '3£CT/fli 1540 (A) (t) OF THE CONSTRUCT/fli SAFETY (R()£RS (YTL£ B CAJ..JFORNIA ADUINISTRAHON CODE SECllON 1540) /SSIJm BY TH£ OCCUPATIONAL SAFCrY AND HEALTH STANDAfllJS BOARD PURSUANT TO TH£ CAJ..JFORNIA OCCUPATIONAL SAFETY AND HEALTH ACT OF 197J. AS AM£NDED, STAJFS.- •PRIOR 7D OPENING AN EXCAVATION, EFFORT SHAll. BE MADE TO DETERMINE WHETHCR UN0£RGROUNO INSTALLATIONS. lE. SEllf"R, WA1l"R, FUEL. ELECTRIC LINES. ETC., IWl1. BE rNCOlJNTCRED AND IF SO. WHERE SUCH UN0£RGROUND INSTALLATIONS ARf LOCATED. WHfN EXCAVAT1QN APPROACHES THE APPRQXfUATE LOCATIQN OF SUCH AN /NSTALLAllON. THE EXACT LOCATION SHALL BE DETfm.tfNED BY CAREFUL PROBING DR HAND DIGGING ANO WHEN IT IS UNCOVERED. ADEQUATE PROTECTION SHAJ.1.
Br PROV/0£0 FOR THE INSTAUA TJ0N. ALL KNOIN OVltlCRS OF UN/lERGRQtJND FACILITIES IN 1ff£: AREA CONCCRNED SHALL 8£ ADVISCD OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF ACTUAL EXCAVATlON."
CALL BEFORE YOU DIG
1. BEFORE PLANT/NC TREES. TRENCHING, POST H0UNG., 81..ASTJNG. GRADING, EXCAVATING, BORING, /JRII..UNG, ETC.. CALL UND£RGROUND SCRIACE ALEF?T FOR UNDERGROUND CLE ARA NC£ THEY 00.L LOCATE AND MARK UNDERGROOND FAC/UTIES, OR PROVIDE TH£ NECESSARY LOCATION INFORUATION TO YOU.
MONUMENT PRESERVATION
I. Tl-IE CONTRACTOR SHALL BE R£SPON981.E FOR THf PRESERVATION OF ALL SUR\£Y Jl{YtllJMWTAYON AND REFERENCE POINTS VI-IJD-1 M'AY 8£ LOST QR DISTLJRB£D AS A RESULT OF THE WORK.
2. PRfOR TO Tl-IE START OF CONSTRUCTJON 1HE CONTRACTOR SHAU 'ER/FY THE LOCATION OF MONUUENTATION WO/ MAY BE DISTURB£0.
HE SHALL 8£ RESPONS!EJLE F<Y/ TH£ PRESERVA ~ {Y{ REPr..ACEUE/VT (£ ALL SUCH UOltUUENTA TION IN COMPLIANCE ttrTH 8771 OF THE 8USIN£SS AND PROFESSIONS ClJD£ AND SECTIONS 732.5. 1492.5 AND 1810.5 OF TH£ CALIFORNIA STREETS AND HJGHWA Y CODE. 3 THE CONTRACTOR SHAU EUPI..OY A UCENSED SURVEYOR TO SET TIES TO A/VY AOIUMENT THAT MAY 8£ DISTURBED M LOST DURING THE COIJRS£ OF TH£ ltO'?I(_ SUCH TIES SHALL 8£ SET IN LOCATION THAT Jff.LL NOT OTHCRJ#SE 8£ DISTUR8£D.
4. TH£ ctJIVTRACTOR SHALL BEAR ALL COSTS OF -VEY, RE--V£Y, REFFRENCE TIES, REPI.ACEM£NT CORNERS, CIXIN£R REca/DS, lrlAPPING. 01£CKING AND RECORDING FffS WHICH MAY 8£ REQUIRED AS A RESllLT OF LOSS OR DISTURBANCE OF UONUUENTATION WIRCH UA Y OCa.JR DURING THE COURSC OF THE IKJRI(
...
~ -
~ •
's
11.49'
N13'22'32"W 71.74'
I S89'.J0'58"F 480.27'
'"'
,~ 454.52"
FD.
-...
"' \'l,_
I
N1J'22'.J2"w 44.55'
\
FD. 2x2 HUB/TACK
Ill MONW£NI ll£U.
NO RECORD
\
\
I
\
\
R=1079.92'
t.=36'47'19"
L-69J.40'
1"/P CA DOT_,.,/'"
36-RS-19
,!Jr)
~---
N
EXISTING CALTRANS
FENCE TO REMAIN
0 «I ,!Jr)
I I I
SCA/.£: 1·= 80'
160
I
I
I
I
I
I
iii
FD. 2,2 HIJIJ/TACK
IN UONIJU£NT
llf"LL, NO RECORD
SGM-MOONGLO,
INC., A SOUTH
CAROLINA
CORPORATION
A.P.N. 023-06-11
2018-0024013, M.C.R.
' '
I .
: I !
I i
I
'>< EP=137 84
+
"'EP=138.30
BY: ==-----MTS
CHK: ~=----RH11
DATE: 2020--09-11
SHEET
C2
OF
6 C
--15'
/,r,.,$.li'l"lll!Glr
8'
12' 12'
7Jf' R/W
104' mAVt:LLfii WAY - - ------J
12'-'--- 15 • --12'
MEDIAN/I.EFT
TURJlUWE 8'
=u,
f;Efl',OOE
- ··-
______ !__.!._~L_l__~~:i~ JLLl YPEIJEi11fl/A"
PAI1ffWlr ~·~
6-LANE MAJOR ARTl:RIAL
, --):-_ _ - _------ -- -~ - 110' R/W: :-_-_-_-_-_-_-_-=._-....J----1 80' IRA\o£L WAY
15 • 12' -12'--1- 16'- -'-- MEJ)/AN/1.UT
Ti.JmJl.A~
12'
4-LANE MINOR ARTERIAL
15' ~~.ll!ICII:-
DEPARTMENT OF PUBLIC WORKS DWG NO:
MAJOR & MINOR A
DATE: 04/10 .. ,rov RTERJALS
/
/
/
,;
/:''' ,1./ 'y '· "·' ' ,; '/ /·',':,, ~~/
{<·;·:~-;-·~ /~-, .... _,_,:X,,, /t/y··::,1~1/ •• ,<.,, .•• · .J -~ 1<,o,;- : ;,•; #/f!} ✓:·;-" #/<./,· .. ,·· ,// ./:/;•·: ;.// _✓ ;,i:;·,.-::, •/ ,f, r ,' _,:J;',-
/:<yl':}" ,;l -'/ 1/
/
I _/
I
I
I
. ' ' ' . " . ' ' ' ' ' '
. '
. ' ' ' . '
' . ' '
. ' ' ' •• ' .
. ' ' ' ' '
. ' ' '
. .. '
' ' ' '
/
/
/
' '
/
' . ''
--
\
\
\
. ST-8
---
\
\
\
\
\
\
\
\
I
J
\
\
\
\
\
\
\
\
\
"' ' '
' '
""
//~
'
"" ' '
""
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
,.
/
/
/
/
/
/
/
' ,, ' ,,
,.
,.
,I/ ,.,,,;,"
/ ,,-1/ /
/
~
/ /
/,/~ /
/
/
\
\
\
\
'
"" ' '
""
Cl~LL BL K> TO ADH£AR ro
STANDARO ST-8 (110' R/W)
✓,
2' PARKING
OVE:RHANG
/
,.
.,
FUTIJRE
QSR3
2,800 sq.ft.
' '
'
"" '
"" '
""
, ,,
,,/ • ,,
/
/
'
'
' '
'
"
..
/,,
/
/
♦
/
•
,
...-
/
/
/
/
/ /"® ,·
/
2' PARKING
OVFRHANG
,.
2" PARKING
OVERHANG
\
2' PARK/NC
OVERHANG
,p
2' PARKING
OVCRHANG
li1ll
,p
RV PARK/ft,/G
--- I
12' :. ,· ';,,;,,.:;=.:'" ::• ,.,. :;::i:t)t:-'.·'.', ':\(.·.,!~! ,f----'-~2.,,,_· _____ __.:
FUTIJRE
QSR4
2,800 sq.ft.
I
__ ..JI
I
---ll
I
---11 2• PARKJNG
OVERHANG
::=====·:;~=·===-----------=-=-=-j i
/
/
/
/
/
/
/
/
/
/
/
/
/
/
RV PARK/NC
•
25'
2' PARKING
OVERHANG
lJUIIP STA r10N FOR RV
ANO TRA lf"L TRAILERS
/
/
/
/
/
' )'
/ ' . ' /
ac.::'P8£LL BL W) TO ADHEAR TO
STANDARO ST-8 (110' R/W)
---- ---
----
/
-
/
/
/
/
/
/
/
/
/
/
/
•
• •
/
/
/
- --
---------- \ C ::;. := := - - - - - - - - -
--------- .::=cJ,MPBELL BLVD:- - - -
-
-
- - --------
-- ---- -- - ---- -------
TRASH £NCLOSUR£ Fi
IRA \EL CENTER, OSR~ & 2
TRAVEL CENTER
QSR 1 &2 '
12,030 sq.ft.
"'-2' PARKJNC
OVERHANG
FENCED IN ABO~
GROUND FUEL STORAGE
t D
PET REL.JEF AREA
IDGHWAY99
0 0
--
0 ,,
,··
£ .,-,
~',:·~
•:: :. . '
X:
.. -
TRUCKING CENTER
SEESHEETC4
A·u
I I 0
I
I
I
==o===I
==o====I
0 ),
\.. I lo
FENCED IN ABO\£~
GROUND Fl1£L STORAGE
.•. ..
MTS
CHK: RHII
DATE: 2020-09-11
- ' " . :;,. ,_ ~
i----_j~ 0
i1 '
DATE:
SHEET
C3
OF
6 '
a
9-
"'
~
~
/
/
/
/
/
/
/
/
/
/
/
/
/
/
- --
--
.---::: -~ - ::::----
---
---
-
---
---
-
' ' ' '
-
-
OSV/1£ FOR
711ASH £C£NNCL1= OSR II .t: 2 1RA\£'L c..-,
' '
--
TO AIJH£AR ro
arr CANP8£LL STANDARD Bl. ~T-8 (110' R/11:1
-
'
- -
... : ..
UNLOADING ZONE
.,
..
~~-
lft- ::.·-.
TRAVEL CENTER,
QSR1&2
12,030 sq.ft.
AUTO CENTER SEE
SHEETC3
(5)
-
t 0 0 0 0
-,
; ,f:
.· ·,:
,,-,
/_,·
·=:·}·
~-·
~:;;·-
·-- . ~ -·
{\
55'
WICEO IN ABO\£
GROUND FUEL SroRAGE
= ,i ABO\£ /FUR STORACC
.tr•/'.)":;if{{f
. -~:
.,
,-_;
-.. - -,-..
~:-;;
.. -.: ., .. ,-,,:
,~.:,
·:-·
-
--
'
0 j
0 ]
0 J
0 ~ J
/
/
/
/
/
/
/
/ - -
/
/
/
/'
/
IC=-_- ---
~ --
' '
• • •
' '
/
/
/
/
/
/
=--- -
'
' '
'
15'
15'
__ ,. ......
' '
'
'
- -
' '
'
'
249'
'
'
' '
--
'
'
----------
'
'
'
'
@
'
'
'
D
'
'
HIGHWAY99
'
'
------...
------
'
'
err
'
'
50'
-
' '
'
'
-
'
'
'
' '
'
--
--------
'
'
'
---,--
------ ------ ------ ........_
........_
. . ., --~.·,<,;, ~::.;. ;;;;-.-, .; .• ,, ,_ .
.,_ •• ·, _,. ::_ ~-:~~. .
' '
'
' '
'
'
'
'
' '
'
'
'
'
' '
/
/
/
-........______
'
'
-........______
/
/
/
'
J(J (J 15
-
J(J 6(J / I --I I I I
'
'
'.
''' ' ..... ....,:rt, ~ ..... ..... ....
......... .:::::- ......... ..... ..... ..... ..... .... .... .... .... .... .... ..... .... ..... ..... ~
ENO.OSI.JR£ F(R
=-.9tCEN1CR It OSR 5
@
..... .... .... ..... .... .... ..... .....
' ''
' ' ' ' ' '
SCALE: ,._ JO •
..._
TO ADHEAR TO
CAJ,IP8£LL Bl. :g 51-8 (110' R/W) CITY STANDA
..._ .:::- ' ..._ .... "--... /
..... ..... .... ...."-- / ..... ..... ..... ... ..... ..... ..... ..... / ....................... ..... ..... ..... .... ... ..._ .... ' /
/
/
..... ............... ..... ~ .......... '"-- .................... ..... ..... ' ........................ ~ ..:-- ..... .... .... ~ ' .......... :::-..... ..... ..... ~ ..... ..... '-... .......... ..... .......... ' ..... ..... ' ........... "-..-..
~
','.::::-,', .................... ................... ..... ' .......... ..... ..... .... .... ..... ............... .::::- ..... ..... /
/
..... ..... ..... ..... ...................... ~ ..... ..... ..... .... 95'
.... ..... .::::- ..... ..... ~ .....
'-....._..,_
...... .:::- ..... ..... ..... .... ..... .... ....
I
I
I
I
I
I
I
..... ..... ..... .... .... ........ .:::- .......... .....................
I
/
/
' '
' -
'-.....__
,...
I
I
I
I
I I
I I
BASIN
SEESHEET95
I
I
I
I
\
I
I
' ' --
I
I
I
I
.... -
- - -
BY:
CHK:
DATE:
OF
RHII
2020-05-08
6 '
3486 i ,
I
I
I
I
I
I
I
I
~
O"I
~
~
I
I
I
I
I
I
I
I
I
n
V'l
I
I
I
I
I
I
I
I
I
I
"' I~ ;l 1 !;1
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
-~~ ,~ '0-A ./
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
N:\3486.00_ Moonglo-Lil'ingston\OW<Js\fahibits\Enlitlernent E•hibils\05_Sile Plon.dwg (01) PLOTTED: 7-26-22 10:J2:04 AM MSasser el
I
'° '°
lS'
-- --
,,
/ ----
10·
\
0 -~
-
>-3
00 ~
!~
til Q
tI1 (') >-3 tI1
Q~
:;>j
0 . ~j
~
;
;
✓//. ;
;
I I/. /
/ I/ /
/ // /
/ // /
I /1 /
/ I/ /
I // I
I I/ I
/ I/ I
I I/ I
I /1 I
// /
/ /
/ /t
I It I
I I/ I
I// I
/ It I
I I; / I
/ I; I /;
I I/ I
I/; I
--✓✓// /
/ // / ;
;
;
I!
/
;
;
/
/ 11/// /
/ //
I I; / I "'a
;
;
I -- I ❖ I t\ ❖ I /
/ /1 / \
i 1';
ctt
ia I
I
I
r ---
I
-------
-----
§~~ ~ r~"'~
~~~<"O
z "~ 0 :;>j
S;zz Q ~"' it'" 0 "O
"' moo < < 0 oo
" r <-< tI1
~!;j~~tl
- iilt" N ti:l o1v-OO> ,;: ;:::iJ~ 0 r;/)
~~~ 0 z 8~8 8
"rj~- •
cl .,. ~ '!'j cl . ~
I
I
I
I
I
I
I
I
I
I
I
I
-
I
I
-
I
I
-
I
I
I
I
I
I
I
-
I
I
I
I
-
I
I
I
I
------
---
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
---
I
I
I
I
I
I
I
I
I
I
I
I
------
---
I
I
I
I
I
I
I
/
I
I
I
I
I
7 I
I
I
I
I
I
11 I
I
---
I
I
I
'
I
' \
I
I
I
I I
I
I
I
I It
I I It I
I l1 I
I l1
I I If
1 I 11 I
I It I
I It I
I I
I It I
I It I
I I'/ I
;
I -'l /
I
I
/;.
//////// ,.,. \\
/ I'/ I
I // / \ / I; I
/,,, ; \
//_,,,,,✓ /; \
/ // /
I I; I
I ❖ /
I It I
I I; /
/ ❖ /
I I; I
/ It /
/ // /
/ I; I I
/ !/ I
I I/ I
I /1 I
I I; I
/ I/ /
I I; I
/ // /
I
I
I
;
;
I // /
/ I/ /
I // I
/ I/ /
I It I
;
I
I
I /1 /
I // I
I I/ I
I I; I
I It I
I It /
I It I
I /; I
It I
I I
I
I
I
I
I
I
I
I
I
I
;
I
/
;
;
\
\
\
\
\
I I I
I
I If
I I It
I
I
I
I
\
I
\
I
I
I
I
I
I
1,
f
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
' -,, I ,-_, ,. ' I ·,·~.
I ); •J
-:•· I t;, t.:.
'~ /1
I ~-
/ Mt I .!'"
,.:;
}~.'•,
... ,1
I '• ,t
I I i
., t .
~:
:Y
.,.
.,. I .. ;,.
I [',,
:t,,
I 1:1·
I ,,
I:
I a,
I\ <I
'1
' I a
' a
I :
' 1,
I
I G
I a
I :
I a
'
I a
I :
' a
I
I ' ,1
a
I ' ' ,I
I
' ,1
,1
I
a \ I
' ,1
I
\ 'I '"'
a
I
,I
<l\ l•I
ii
a
,,
,1
,I
,I
,1
,1
I
a
,I
I
I
I
I
I
I
I
I
I
I
I
I
I
I It I
I It
I I It I I I
I I
I
I It
I I It I
I It
I 1111
I It
I
I
I
I
I
I I I It I
I It I
I
I
I
111;
I I/ I
I I/ I
I It I
I It I
I It I
I It I
I I/ I
/l;I I 11 t
I I/ I
I I/ I
I// I
I I/ I
I I/ I
0 , ,, /
I I/ I
II I,, I
II I/ I
I
I
I I I I I
I I I I
I I/ I
I if I
1/,;'/
I
f1 /JI
1 I It / i
i I/ I
I I I I
I I/ I
ti I I I t
i If I
I I I t
I I t
.
1 f If I
I I /
I I I
I
I
I
I
I
I
I
I
I
/ I I t
·11 I I
I I /
If I
I
I
I I I I I Ii I I
I
I I I
I // I
/
II I
/i I
II I
I
I
// I
I
I
I
I
I
I
I
I
Q~
ii
~a
.. ,.
"2'~
"-t
ia
I
I
I
I
I Ii I
~ I I I I
I
I
I
It!!!
I I II I
1111 I
I II I
,,.
,,.
I 11 I
1111 I
1111 I
I II I
I 111 I
/ f / I
I II I .,,"'
I I I ;
1111 ,,."'
I ii I.,,·"'
i,-(
I I
I I
I I
I ji I
I 11 I
I !I I I 11 I
I I I
I 111 I
I Ill I
I I I I
I 11I I
I Ill I
I \ I \
I I I I
I 111 I
I I~ I
I 1) I
I 111 \
I I~ I
\ \ \
\ \ \
I II I
I I! I
I '.l I
I II I
I i'.1 1
' " " " " " " " " " "
" " " \ " " " " I "
I
,,.
I
I
\
I
I
\
l
I
,,.
,,.
I
\
I
,,.
,,.
.,,
,,.
,,.
,,.
,,.
.,,
,,.
,,.
I
I
I
.,,
,,.
I
I
I
,,.
,,.
,,.
.,,
,,.
,,.
.,,
,,.
,,.
,,.
,,.
,,.
,, 0 3: ~ ~ el f!l ~ .. ~ 0 z ~ ' ► 0 ;;o
11; $20
~ 1~ . ~ ;;o
1:q!
m
a I l )>
r
(/')
""
I ~ OJ
0 !:l
~ m
::!:i
0 ,,
"
C:
"'
~ :;:
0 ~
~
i
(;"l
z
RI
-
,,.
.,,
,,.
,,.
,,.
,,.
.,,
.,,
,,.
,,.
~ ~
~
~ ::0
),.
::0
ril
::ti
Si::
r--
,,.
.,,
•ffi !!
11 ,,.
,,.
.,,
.,, .
.,,
,,.
I
~;;;
I! f
~,,; "!
! l
"!.
I
.;
,,.
,,.
.,,
,,.
~~I : ~ ii"\ ~ ~ l ~ -
"'
I
-
"' I t"
"!
l
~;;;
~ .
,,.
,,.
,,.
,,.
·~
:Iii
~
c:5
::0
),.
::0
~ ::0
Si::
r--
,,. .,,
,,.
,,.
,,.
.,,
.,,
.,,
1lh ii
l1;;;
~-
<>t
~n i
111 • "!.
~' +
~
I
,,.
,,.
P\.i ~
.,, ,,.
....
~~ I ~ ~ ilf ~ ~ I ~ - '< "!.
' I
~
I
l iliji u
"!
d e !1 I,.:;_
!i < - ~
,,.
,,.
\
.,,
\
\
\
.,,
.,,
,,.
·---.
\
\
\
,,.
.,,
\
\
,,. ,,.
/
\
,,.
HA WK.INS & ASSOCIATES
ENGINEERING, INC.
~ @ ~ fil ~ .. RODRICK H. HAWKINS RCE 50188, PLS 9489
ENLARGED SITE PLAN
PLANNING EXHIBITS FOR:
SGM MOONGLO INC.
PROPOSED TRAVEL CENTER
LIVINGSTON, CALIFORNIA
'!fl 436 MITCHELL ROAD
MODESTO, CA, 95354
PH: (209) 575 - 4295
FX: (209) 578 - 4295
I 1; la
6 ~
ANDREWS. FOX RCIJ 84375
SYM.I DATil I DIJSCRIPTION OF REVISION I APPD.
~~~·;::!~ I I I I I
- - --
caitN£CT PROPOSED WATER
TO EXISTING WATER
- - .... 0._ ~ 0 c,· --
- --.....,___ -- "
I
I
I
I
I
I
, .: .
~l
fl
~- ~ ;
________ _)
- -- -
' 1
I I
" ,, : I
" " " " " " ' "
CONN£CT £XISTING
STORl,I DRAIN ,. . : ~· ..
WATER CONNCCTION FOR
DOMf511C WATER FOR OSR 2
43 AND FOR FIR£ WATER LOOP
WA TCR CONN£CTrON FOR DOU£STIC
WAJ'fR FOR 0SR 1, LANDSCAPE
AND FOR FIR£ WATER LOOP
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-:......---
PROPOS£0 ST0/11,/ DRAIN
PROPOSED S£11£R
PROPOSED WA T£R ' FIR£ HYDRANT
FIR£ WA T£R FDR OSR /2
if I
DOMES11C WAIFR FOR OSR /2
I I I
5£,ER r,
'\.\ "-
DOUESTIC WA T£R FOR OSR
FIR£ WAIFR FDR OSR /J
FIR£ HYDRANT "
SEVCR ANO WATrR SERVICE
FCIR DfJl,IP STA TrON
FIRE HYDRANT
ABDI£ GROUND FU£L TANKS
--....... CONNECT EXISTING
ST0/11,/ DIIAIN
FIR£ HYDRANT
DOMES11C WAIFR FDR OSR /1
~ 'J'
FIR£ WA T£R FDR OSR /1
I ltl
Sf11£71 FOR OSR /1
. 023-07-13
0797,
·--·--·--·--
I
I
I
I
I
WATER CONNECTION FOR FIRC
WAJFR LOOP
420 INDUSTRIAL
DRIVE,LLC
A.P.N. 023-06--07
FIR£ !WATER FOR QSR /1 \
! A.
DOlrlESTrC WATER FOR OSR /1
SEMfR FOR OSR /4
I
INSTALL CATCH BASIN
'
WA 7E:R CONNECTION FOH OOM£ST1C
WA 7E:R FOR OSR 4. LANDSCAPf
AND FOR nRE WATER LOOP
JNSTAU. CATCH BASIN
\
/~
/ \
/
/ / '\
/ / \
/ " . / /
PROPOS£D STORM DRAIN
OUTTALL INTO BASIN
/ /
\
\
\
\
\
\
\ ( -..., PROPOSfD STORU ORAJN ._, OUTFALL INTO BASIN
PROPOSED BASIN ' ' MAX VOLUME 272,800 CU.FT.
EXISTING BASIN VOLUME 164,350 CU.FT.
PROPOSED BASIN VOLUME 272,800 CU.FT.
VOLUME INCREASED BY 108,450 CU.FT.
' ' ' ' '
PROPOSED STORlrl DRAW BASIN
VOLUME 270,000SQ.FT.
CAUTION: UTILITY LOCATION NOTES
1. EXISTING IJNOERGROUND Ulll.111£S AR£ SHOWN AS THEY AR£ 8£U£V£D TO £X1ST. TH£ l.OCA TIONS SH0"1t AR£ BASED ON RfCCJRD JNF~TJON. PROWJED BY 01HER5, Al,/() BY F1£LD LOCATrON OF 5t.)l?FAC£ FEATURES. 11115 JNFORMA~ 15 PRQWJEO ONLY AS AN A/0 TO THE CONTRACTOR. rn£R£FORE, rn£ OWNER AND £NGIN£ER CANNOT ACCEPT R£SPONSIBII.JTY FOR TH£ LOCATION AND/OR 0£5JGNATION OF EXISTING UNDERGROUND FAQUrr£5. PRIOR TO C<Nll£NCING WORK 1HE CONTRACTOR SHALL HA\£ CAOI UT1LITY COUPANY ACCURAllIY LOCATE rN TH£ F1£l.D TffDR UA1NS AND 5£RVIC£ UNES. CONTRACTOR SHALL VERIFY LOCAnON (BOTH Vf.RTICAJ..
AND HORIZONTAL} OF ALL EXISTING UND£RGllOfJND FACIUT1£S AND NOTIFY £NGIN££R OF ANY DISCR£PANCl£S OR CONFLICTS. IT SHALL 8£ THE CONTRACTOR'S RESFUVSIBIL/TY TO PR07ECT ALL £XIST1NG UT/Lll/£S. SO THAT NO DANACC R£SUL TS ro 1H£M DURING 1HE P£RFORUANC£ OF HIS HCW1<. AT LEAST 48 HOURS PRIOR TO CONSTRUCnON THE CCNTRACTOR SHALL CONTACT U.SA AT 1-800-227-2600. TCST UN£ OF TCXT
2. '3£CYfli 1540 (A) (t) OF THE CONSTRUCT/fli SAFETY (R()£RS (YTL£ B CALIFORNIA ADUINISTRAHON CODE SECTION 1540) /SSIJm BY TH£ OCCUPATIONAL SAFErY AND H£Al.TH STANDAfllJS BOARD PURSUANT TO TH£ CAJJFORNIA OCCUPAnONAL SAFETY AND HEALTH ACT OF 197J. AS AM£ND£0, STAJFS.- .PRIOR ro OPENING AN EXCAVAnON, EFFORT SHAll. BE MAD£ TO OETERMIN£ WHETHCR UNOCRGROUNO INSTALLATIONS. lf. SEllf'R, WA1FR, FUEL.. El.£CTRIC l.lN£5. £TC., IWl1. Bf £NCOlJNTCRED AND IF SO. Wff£RE SUCH UN0£RGROUND INSTALLATIONS ARf LOCATED. WHEN £XCAVAT1QN APPROACHES THE APPRQXfUATE LOCATIQN OF SUCH AN INSTALLATION. THE EXACT LOCATrON SHALL 8£ OETfm.tfNEO BY CAREFUL PROBING DR HANO DIGGING ANO WH£N IT IS UNCOVERED, AD£0UAT£ PROJFCTION SHAJ.1. 8£ PROV/0£O FOR THE INSTAUA TJ0N. ALL KNOIN OVltlfRS OF UN/lERGRQtJND FAC/l.lT/£5 IN 1H£ AREA CONCCRNED SHALL 8£ ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO TH£ START OF ACTUAL £XCAVAT10N."
CALL BEFORE YOU DIG
1. BEFORE PLANT/NC TREES. TRENCHING, POST H0UNG., BLASTING. GRADING, EXCAVATING, BORING, /JRII..I..ING, ETC. CALL UND£RGROUND SERIACE AlEF?T FOR UNDERGROUND CLEARANCE. THEY Wl.L LOCATE AND MARK UND£RGR00ND FAC/UT/£S, OR PROVIDE TH£ NECESSARY LOCAnON INFORUATION TO YOU.
MONUMENT PRESERVATION
1. m£ CONTRACTOR SHALl. BE R£SPON981.£ FOR 1H£ PRESERVATION OF ALL SUR\£Y Jl{YtllJMWTAYON AND REFERENCE POINTS l'HOI M'AY 8£ LOST QR DISTLJRB£D AS A RESULT Of THE WORK.
2. PRfOR TO m£ START OF CONSTRUCTJON 1H£ CONTRACTOR SHAU 'ER/FY TH£ LOCATION OF MONUUENTATION WO/ MAY BE DIS1URBED.
H£ SHAl.L 8£ R£SPONS!EJL£ F<Y/ TH£ PRESERVA ~ {Y{ R£Pl.AC£UE/VT (£ ALL SUCH UONUU£NTA T!ON IN COMPLIANCE ttrTH 8771 OF TH£ 8USIN[SS AND PROFESSIONS ClJD£ AND SECTIONS 732.5. 1492.5 AND 1810.5 OF TH£ CALIFORNIA STREETS AND HJGHWA Y CODE. 3 TH£ CONTRACTOR SHAU £UPLOY A UCENSED SURVEYOR TO SET T/£S TO A/VY AOIU/rl£NT THAT MAY 8£ DISTURBED M LOST DURING TH£ COIJRS£ OF TH£ ltO'?I(_ SUCH TIES SHALL 8£ SET IN LOCATION THAT Jff.l.L NOT OTHCRJ#SE 8£ DISTUR8£D. ' ' ...
' ' '
' ' '
'
'
\ \
\
\
' '
' ... '
'
\
\
' \
' '
' '
' ' ' '
N
\
EXISTING SEWER FORCE MAIN
SGM-MOONGLO, INC.,
A SOUTH CAROLINA
CORPORATION
A.P.N. 023-06-10
2018-0024013, M.C.R.
25.61 ACRES±
STUB PROPDS£D STIJRU
DRAIN FOR Fl/Tl/RE
CONNECTION
8fJ 160
1--1
CITY OF
LTVINGSTON
A.P.N. 023-06--08
4. THE ctJIVTRACTOR SHAl.1. BEAR Al.1. COSTS OF =vrr, RE--VfY, REFFRENCE TIES, REPI.ACEM£NT CORNERS, CORNER REca/DS, lrlAPPING. 01£CKING AND RECORDING FffS WHICH MAY 8£ REQUIRED AS A RCSllLT OF LOSS OR DISTURBANCE OF UONUU£NTATION WIRCH UA Y OCa.JR DURING THE COURSC OF TH£ IKJRI(
SCA/.£: I"= 80'
I
I
I
I
CONWECT PROPOS£D SEl'ER
TO EXISTING S£1'£R
SGM-MOONGW,
INC., A SOUIH
CAROLINA
CORPORATION
A.P.N. 023-06-09
2018-0024013, M.C.R
L ________________ _
I /
I-- - . - - . ___J
: I ~------:
I . L ___ J
I
I
r- -- -- ----- -- ----- -- _j ;
I
I
I
SGM-MOONGLO,
INC., A SOUTH
CAROLINA
CORPORATION
A.P.N. 023-06-11
2018-0024013, M.C.R.
I
I .
: I !
I i
'
'
'
'
'
'
'
I
'
'
'
I
l
'
'
'
I-_-· I --.--- . - - . ___J '--·
'---·----+------------1 I-_.
L ________ J L.
~-- _, --...J - __ _,
r-- -
'--. -
- - I
BY: ==-----MTS
CHK: ==----RTIII
DATE: 2020--05-08
~
~
t-----------1~
SHEET
C6
OF
6 : C'J .. , ...... ..... ... ... ..... -40 ...... ... ~ .!l!..J::WIJJ-,T('.i ....... .. ~ ...
-- ---------- ---------------------------
QuikWay
. I T" I . • ,' , ' ..
,· .
- ~ ..•.••• I;~ , ...................... ........... llliGtM!!!I , ........... "'••• r rT l••• 1.••• .!••. L .il. l l !J' .......................................................................................................... l , ....................................................................... , .l .l .l THE Q CAVE .l .l .l ice cold beer in here!
:J£ ~ i
Qui kWa y the best way to shop
I
i
! 0 .9. ~-
' '
i
========~====::::======== I~
~ei~a~:• ~ ~ea~·-y---"'< r01<
.~~V"',..-..: ~A( ¾/A•-~--~ ~'¥, ... ,
<
'
RESTROOMS •
·' =
-
I I I
□ □ □
.2.
---------......... ---........ ------...1 - -
0 . .,
·-·········-·········--·--··-·-······················---------··-·- r LAUNDR~ L
G
f-
.~·-·--····-..-- -
. .., •
l
i,.......,, y.
,........,
•
0 OPTION 3
zvi i
oz s
i
0 •
C,- I c( ... ! ar:::, ...J i
cCo !
A. V)
e I
I
!
(L
~
ILi
...
ii'i
D
ILi
ti)
2 ~
•
ii
~8T•-----
~8T,
OAT'£, 2919·2·at
JCl&Ml.#"eal:•~
SCAU, ~
,..,,_1_.,ZJ_
OSP,
2.155 5 f'
05P
r .,~9 s r
OJ] OJ] OJ] OJ]
ti 1.I.i i n1.8.1
ti 1.I.1 i n.[J.§J
~
~
!CEEJ .. l~ ~
~
--
z V)
oz
0 "-....
er::::> ...J
4Co
A. V)
e I
I
z
0 <(
_J
_J <( CL
0 u I- z z :::i 0 0 0 >- ~ ::?: <fl <( " _J z ::?: > 11.J 0 ::; Di
ll) 0
Ill)
I
0RAl,f,I BT,______..!!R
CH[O(D) BT•--·
DAtt.~
.m ~•------1!!!i
~-~
\
\
; ;_ - • -- -- -- -- 7• --- \
' . .
--
- ~ /--,
~ -- . ~ -
Q
EXTERIOR RENDERINGS
3052 I MOONGLO - FINAL
QuikWay
PARAGON
SOLUTIONS
ColdTreats HotCoee
WELCOME THANK YOU
ice cold beer in here!
Q
QuikWll11
FROZEN BEVERAGES COFFEE ENTRANCE
s s s TME Q CA¥E S i s - -
'I/! '{ff - .... .... ,- ~
,- -
BEER CAVE COOLER INTERIOR BEER CAVE
Qui k Way the best way to shop
,_
COOLER SHELVING
INTERIOR RENDERINGS
3052 I MOONGLO
fil:\,PARAGON
\:}:lsoLUT IONS
TruckShop
EnjoySweet EnjoyGrilled
RESTROOMS
CASHIER FOUNTAIN TEA/FROZEN
CASHIER COFFEE CONDIMENTS HOT FOODS
8 e=
II ,--
SHELVING LOUNGE HALLWAY LOUNGE HALLWAY LOUNGE HALLWAY
INTERIOR RENDERINGS
3052 I MOONGLO
fil:\. PARAGON
\:}:lsoLUT IONS
WELCOME THANK YOU
SHOWERS LOUNGE
I I I
□ □ □
LOUNGE LOUNGE LOUNGE LOUNGE
I I I I
g Q 11.w.lluO QulkWliy
11 TRUCKER ENTRANCE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
I
SHELVING SHELVING
INTERIOR RENDERINGS
3052 I MOONGLO
fil:\.PARAGON
\:}:lsoLUT IONS
LAUNDRY
SHOWER
1 SHOWER2 SHOWER3 STAFF
ONLY
STAFF
ONLY
LAUNDR~ ~
,..
-~ 8 -I= -
E 8
-
I
I I I 1~ ~ "'-. I I I
SHOWER & LAUNDRY HALLWAY
-
~
0 8
I. J
SHOWER LAUNDRY RESTROOM HALLWAY
-
l
0 B ~ -
I I 1: ]
SHOWER & LAUNDRY HALLWAY RESTROOMS
INTERIOR RENDERINGS
3052 I MOONGLO
fil:\. PARAGON
\:}:lsoLUT IONS
HI G H WAY 99
CampoellAvenue
;.;;._: lo..,. ~ ... loM-t
- .... , .. 1
Cross Section - O Pion 1· 1
Pro osed Trees
"'''"'."°"' ..... .i.,,i,, (.,, .. N,.,.. .. ,:,_ .,.1 .. , ... ~:i=oe Concept
Cross Section - O pion 1· 2
d
LANDSCAPE
ARCHITEC"TlJRE
PLANNING
Moonglo Center
\.ftl"'!IJlan CA
SGM Moonglo Inc
~=:;.- .
fu1u,., ..... ~-bohind ...........
1rian9..i..t,,""'°".,;,h1renin
pa,k,oo,.,,;p
--
P"'~'"9 <ado, CalGr..,,,
-··
. . . ,,
.. .. .... . . :,: 1 ·,I '•
Fu!\i,o,1,oot1,ee,khindoidowolk,
rr,.,..gut.,,.,.,p<Xcd,..,thtr.n"'
pa,kw..,,t,,p
Larg,o ,pu,odon;locH
"~d"">'~"' ""'"9 H'11hwo, 99 ~u,~<1g•
L-e•-•nt e-<<!<t,..,,,,,.....,d~,
,nlMpo,kwo, ..,,polongC::~
'
LANDSCAPE
ARCHITECTIJRE
PLANNING
151N.MoilinSl.,S.0-•.CA95370
(2091$32-21!$$
Moonglo Center Uli.-.g1t"" CA
SGMMoonglolnc.
c; .. -A .. ..,. ~-~
Pr-..,Y
L.andacape
Plan
Dnn:\Cliew4:
-•l"[)"Jfl+
Sheet Number:
L0.2
"'•"""u•°"'"11,t,..1>u,~ •'•l>e 1,,.,;1a;M1J
"'""~-o,ng.h,ub,,.,ne>.""dna"-
"P''Uht1h,ub,1oa«""""""lno
a,eh~o,:t,.,,olfa,m,
\ \
Con•,.vou,..,11111""
nedgeolongH19hwo,99 ,_,.
Irrigation
Thll o.WO l<te wlh""ll-•q•,..,.-•,-•M d.........,lu_.,_Olj'oWolorEMclo<tl~Ordnoonca (WCI.O). Thll ......... ~•-wlalgd/Ds_-.go_ ...,,.....,...,_...,.,ay10,.......,..a,<"".,_• Thll•~II_,,_., .. -"-" --•-q.,,<1. ... ""- """' .......... ..... .,,..,,,,,,...,.._ -.. ,.·-·... -~ _ .... :;l~==t~,:~:::..=~:...~~ ,. Tree ____ Root ., ______ Barriers ..,.,~,-- -----~--•N_..., .,., __ .... _ .. ____ ,... __ ___ ,...., __ _ , ., • .,.,,....,1or.c1_,_.,... .. _......., ...
F,,,t,,,o 'll<oelkee<lw,lw,ol"olewo!k,
i.....,gulc,,Jr'l>O<"dwirh!Y,,,,.n
po,1,.woyotr,p
Preliminary Plant Palette
0 _,_....,.,_,.,~ .... eo,,..,__,,_
, __ ,_
r'"\
OJ
,..., .. ..,. .....
qq
,,.,..,.,....,c,~ ..
--
•-M-,;, .. ,
~--;_:•.v- ...
lnlntmolgr<>UDing1olu,,...c,long1he
H,g.....,.,.91'franl0g1.lrttslabe
l<><aled obc,,.c, lhe h;gh ,.011, ~ ...
mmrrrmm l-E9'~!~- 1!1lUll!!WJJ C<ooo---.'-111,r
r.-.:ii-,. .MF-•-•
...,_.... __ _ fl< __ ..,_,.,,,.., ...
··----
_.,~I ... _ o,_s,. .. _,..
:::f-.N
F_. ...... .._ ___ C.t, Cll lh-'°"""'"....,_.,•-.. P,-Sp,,<.fc~el~ .. 11. , ...... .,. ,...,... .. _ .. ollwo..;I> "'° .,...,.v.,...,..,.,..,.,_._ F.,u,e11,..,l!oo>b.thoM.,dewal.,
!riangula,lr•DG<ed.,fh!Y.,...,n
p11<kwoy<!np
WELO Waler Use Calculations
__ ,,._..,. .... ... ...,_, _ _ .,,...._ ·---- ... _ .. .., ....... .. ·--.., ··----~ .... ,_, ...... ,_,. __ ...... •--....,._ -·--•hWng._ .......... ~....-...... ., .......... -~·~·
0.1 t>!Sol • ·•• M•-
~ .1' IIUU.l'
--;;- u ...
0' "
~
" ' 11.1 .. -f- ,...--;:;;:;;;--.;-~ -., ~
--- u ., .... , • ., .. - ,.
------ - > - • .-.. ,,_N.. ._., U IJ l 40 ,! ,._.., -
-- --------- ---- u--,,_,...,_..,__ ,,,,., n""" ,., • .,., , .... ,,... __ t .. _... ,...,w-u._,c-....,, -··• , ,o-..,•
t--t:,,,,,; ........ r
LANDSCAPE
ARCHITECTIJRE
PLANNING
151 N, ~ Sl, Scinor•. CA 95310
(20'l)532•2156
e .
. '
,u~,· ••·-•·•••• • . .__.,· ••.-• •••
@;;,,o
Moonglo Center Ullong1lon CA
SGM Moonglo Inc. ,_,
u, .. _,c.-.
P....,...,-y
L.and8cape
Plan
Sheet Number:
L0.3
PUBLIC REVIEW DRAFT
INITIAL STUDY/
MITIGATED NEGATIVE DECLARATION
FOR THE
LIVINGSTON TRUCK STOP COMPLEX
Livingston, California
December 2020
Prepared for:
City of Livingston
1416 C Street
Livingston, CA 95334
209-394-8041
Prepared by:
BaseCamp Environmental, Inc.
802 W. Lodi Avenue
Lodi, CA 95240
209-224-8213
BaseCamp Environmental, Inc.
PUBLIC REVIEW DRAFT
INITIAL STUDY/
MITIGATED NEGATIVE DECLARATION
FOR THE
LIVINGSTON TRUCK STOP COMPLEX
Livingston, California
December 2020
Prepared for:
CITY OF LIVINGSTON
1416 C Street
Livingston, CA 95334
209-394-8041
Prepared by:
BASECAMP ENVIRONMENTAL, INC.
802 W. Lodi Avenue
Lodi, CA 95240
209-224-8213
i
TABLE OF CONTENTS
Page
Notice of Intent vi
Mitigated Negative Declaration vii
Chapter 1.0 INTRODUCTION 1-1
1.1 Project Brief 1-1
1.2 Purpose of Initial Study 1-1
1.3 Environmental Evaluation Checklist Terminology 1-2
1.4 Summary of Environmental Effects and Mitigation Measures 1-3 Chapter 2.0 PROJECT DESCRIPTION 2-1
2.1 Project Location 2-1
2.2 Project Details 2-1
2.3 Permits and Approvals 2-4
Chapter 3.0 ENVIRONMENTAL CHECKLIST FORM 3-1
3.1 Aesthetics 3-1
3.2 Agriculture and Forestry Resources 3-3
3.3 Air Quality 3-5
3.4 Biological Resources 3-13
3.5 Cultural Resources 3-16
3.6 Energy 3-19
3.7 Geology and Soils 3-21
3.8 Greenhouse Gas Emissions 3-25
3.9 Hazards and Hazardous Materials 3-28
3.10 Hydrology and Water Quality 3-32
3.11 Land Use and Planning 3-37
3.12 Mineral Resources 3-39
3.13 Noise 3-39
3.14 Population and Housing 3-43
3.15 Public Services 3-44
3.16 Recreation 3-47
3.17 Transportation 3-48
ii
3.18 Tribal Cultural Resources 3-59
3.19 Utilities and Service Systems 3-60
3.20 Wildfire 3-63
3.21 Mandatory Findings of Significance 3-65
Chapter 4.0 REFERENCES 4-1
4.1. Document Preparers 4-1
4.2 Documents Cited 4-1
4.3 Persons Consulted 4-4
Chapter 5.0 NOTES RELATED TO EVALUATION OF
ENVIRONMENTAL IMPACTS 5-1
APPENDICES
(Note: Appendices are available for review online at www.livingstoncity.com) A. Air Quality Modeling Results
B. Biological Resources Database
C. Cultural Resources Databases
D. Traffic Impact Study
LIST OF FIGURES
1-1 Regional Map 1-5
1-2 Vicinity Map 1-6
1-3 USGS Map 1-7
1-4 Aerial Photo Map 1-8
1-5 Assessor’s Parcel Map 1-9
2-1A Site Plan Overview 2-5
2-1B Site Plan, West Section 2-6
2-1C Site Plan, Middle Section 2-7
2-1D Site Plan, East Section 2-8
2-2 Travel Center Building Elevations 2-9
2-3 Preliminary Landscape Plan 2-10
LIST OF TABLES
1-1 Summary of Environmental Impacts and Mitigation Measures 1-10 2-1 Project Site Development at Buildout 2-3
3-1 San Joaquin Valley Air Basin Attainment Status 3-6
iii
3-2 Estimated Project Construction Air Pollutant Emissions 3-9 3-3 Estimated Air Pollutant Emissions from Project Operations 3-10 3-4 Estimated GHG Emissions from Project 3-27
3-5 City of Livingston Maximum Stationary-Source Noise Exposure 3-41 3-6 LOS at Study Intersections – Existing Conditions 3-51 3-7 LOS at Ramp Junctions – Existing Conditions 3-51
3-8 LOS at Study Intersections – Existing Plus Project Phase 1 Conditions 3-53 3-9 LOS at Study Intersections – Existing Plus Project Buildout Conditions 3-55 3-10 LOS at Ramp Junctions – Buildout Conditions 3-56
3-11 LOS at Study Intersections – Cumulative Conditions 3-66 3-12 LOS at Study Intersections – Cumulative Plus
Project Phase 1 Conditions 3-67
3-13 LOS at Study Intersections – Cumulative Plus
Project Buildout Conditions 3-68
iv
LIST OF ACRONYMS
USED IN THIS DOCUMENT
AB Assembly Bill
ADT average daily traffic
APN Assessor’s Parcel Number
ARB California Air Resources Board
BMP Best Management Practice
CalEEMod California Emissions Estimator Model
CalEPA California Environmental Protection Agency
CAP Climate Action Plan
CEQA California Environmental Quality Act
CNDDB California Natural Diversity Data Base
CO carbon monoxide
CO2 carbon dioxide
CO2e carbon dioxide equivalent
CUPA Certified Unified Program Agency
dB decibel
dBA A-weighted decibel
DTSC California Department of Toxic Substances Control
DWR California Department of Water Resources
EIR Environmental Impact Report
EPA U. S. Environmental Protection Agency
ESA Environmental Site Assessment
FEMA Federal Emergency Management Agency
GAMAQI Guide for Assessing and Mitigating Air Quality Impacts GHG greenhouse gas
IS/MND Initial Study/Mitigated Negative Declaration
ISR Indirect Source Rule
ITMM Incidental Take Minimization Measure
Ldn Day-Night Average Sound Level
Leq Equivalent Sound Level
Lmax Maximum Sound Level
LOS Level of Service
mgd million gallons per day
MS4 Municipal Separate Storm Sewer System
NAHC Native American Heritage Commission
NOI Notice of Intent
NOx nitrogen oxides
NPDES National Pollutant Discharge Elimination System
v
PM10 particulate matter 10 micrometers or less in diameter PM2.5 particulate matter 2.5 micrometers or less in diameter ROG reactive organic gases
RWQCB Regional Water Quality Control Board
SB Senate Bill
SJVAPCD San Joaquin Valley Air Pollution Control District SWMP Storm Water Management Program
SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TAC toxic air contaminant
UST Underground Storage Tank
WDID Waste Discharger’s Identification Number
City of Livingston
1416 C Street
Livingston, CA 95334
Attn: Randy Hatch
NOTICE OF INTENT TO ADOPT MITIGATED NEGATIVE DECLARATION
AND NOTICE OF PUBLIC MEETING
Notice is hereby given that the City of Livingston has prepared an Initial Study (IS) of environmental effects and intends to adopt a Mitigated Negative Declaration (MND) for the Livingston Truck Stop Complex. The City of Livingston is the Lead Agency for this project under the California Environmental Quality Act (CEQA).
The project proposes to develop approximately 18.9 acres of currently vacant property as a travel center that would serve trucks and passenger vehicles, primarily those traveling on nearby State Route (SR) 99. Nine fuel dispensers serving trucks and ten fuel dispensers serving passenger vehicles would be installed, each dispenser with two pumps. Subsequent development would add three quick-serve restaurants with associated parking. A storm drainage retention basin would be constructed at the eastern end of the project site.
The IS/MND analyzes the potential environmental effects of the project in the environmental issue areas specified in CEQA and the State CEQA Guidelines. On the basis of this analysis, the IS/MND finds that the project will not involve any significant environmental effects, provided that the mitigation measures described in the IS/MND are implemented. The project proponent has agreed to the mitigation measures, and these measures will be included in a Mitigation Monitoring/Reporting Plan to be adopted by the City of Livingston in conjunction with the IS/MND and approval of the project. There are no sites identified under Section 65962.5 of the Government Code located on or near the project site.
Copies of the IS/MND are available for public review at the City of Livingston Planning Department at the address shown above and at the City's website: https://www.cityoflivingston.org. The City will accept public and agency comments on the IS/MND during a 20-day review period that will begin on December 30, 2020 and end on January 19, 2021. Comments may be submitted by mail or e-mail to the City at the address shown above or to [email protected] and [email protected] .
In addition, notice is hereby given that the Livingston Planning Commission will consider the IS/MND and the Mitigation Monitoring/Reporting Plan at a public meeting scheduled for February 9, 2021, at 7:00 pm in the City Council Chambers, 1416 "C" Street, Livingston, California.
I t. I I --1---4- j :,,t,,,./;:l, !f-a{v· ···-
Randy Hatch, Contract City Planner
December 30, 2020
vii
MITIGATED NEGATIVE DECLARATION
A. General Project Information
Project Title: Livingston Truck Stop Complex
Lead Agency Name and Address: City of Livingston
1416 C Street
Livingston, CA 95334
Contact Person and Phone Number: Randy Hatch, Contract City Planner 209-394-8041, ext. 123
Project Location: The 18.9-acre project site is located on three parcels southeast of the intersection of Campbell Boulevard
and Hammatt Avenue in northeastern Livingston.
The site is shown on the USGS Cressey, California,
7.5-minute quadrangle map within Section 25,
Township 6 South, Range 2 East, MDBM.
Project Sponsor Name and Address: SGM-Moonglo, Inc.
19898 Avenue 24
Chowchilla, CA 93610
803-445-7200
General Plan Designation: Highway Commercial
Zoning: C-3, Highway Service Commercial
Description of Project: The project proposes to develop approximately 18.9 acres of currently vacant property as a travel center
that would serve trucks and passenger vehicles,
primarily those traveling on nearby State Route (SR)
99. The project would initially construct a travel
center building that includes a convenience store and
a quick-serve restaurant and a second building that
would house a tire center and space for another
quick-serve restaurant. Nine fuel dispensers serving
trucks and ten fuel dispensers serving passenger
vehicles would be installed, each dispenser with two
pumps. Subsequent development would add three
quick-serve restaurants with associated parking. A
storm drainage retention basin would be constructed
at the eastern end of the project site. The project
would require a Conditional Use Permit (CUP) and
site plan and design review approvals.
viii
Surrounding Land Uses and Setting: The project site is in a developing area adjacent to the SR 99 freeway at the Hammatt Avenue
interchange. SR 99 forms the southern boundary of
the project site. Existing commercial development is
located to the north. Land east of the project site is
vacant. Land across Hammatt Avenue to the west is
also vacant, but a travel-oriented commercial project
has been approved for development.
Other Public Agencies Whose
Approval is Required: San Joaquin Valley Air Pollution Control District Have California Native American No tribes have requested AB 52 notification. tribes traditionally and culturally
affiliated with the project area
requested consultation pursuant to
Public Resources Code Section
21080.3.1? If so, has consultation
begun?
B. Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a “Potentially Significant Impact” prior to mitigation, as indicated by the checklist on the following pages.
Aesthetics Agriculture/Forestry
Resources
Air Quality
Biological Resources Cultural Resources Energy
Geology/Soils Greenhouse Gas Emissions Hazards/Hazardous Materials
Hydrology/Water Quality Land Use Mineral Resources
Noise Population/Housing Public Services
Recreation Transportation Tribal Cultural Resources
Utilities/Service Systems Wildfire Mandatory Findings of Significance
v
v
v
v v
v
C. Lead Agency Determination
On the basis of this initial evaluation:
o I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. ✓ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
o I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
o I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated'' impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. □ I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier ElR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project. nothing further is required.
CITY OF LIVINGSTON
COMMUNITY DEVELOPMENT DEPARTMENT
Date
ix
Livingston Truck Stop Complex IS/MND 1-1 December 2020
1.0 INTRODUCTION
1.1 Project Brief
This document is an Initial Study/Mitigated Negative Declaration (IS/MND) for the Livingston Truck Stop Complex Project (project) in Livingston, California. The 18.9-acre project site is located at the southeast corner of the intersection of Campbell Boulevard and Hammatt Avenue adjacent to the SR 99 freeway in northeastern Livingston (Figures 1-1 to 1-5). This IS/MND has been prepared in compliance with the requirements of the California Environmental Quality Act (CEQA). For the purposes of CEQA, the City of Livingston (City) is the Lead Agency for the project.
The project proposes to develop a range of truck and passenger car travel-oriented commercial uses on the site in two phases. Phase 1 would include a central building with a convenience store and two quick-serve restaurants, along with restrooms and showers for travelers and fueling stations for passenger vehicles. A truck service area to the east would consist of a diesel fuel dispensing area, a CAT scale, and a building that would accommodate both a tire center and a future quick-serve restaurant. Proposed site development would include parking for passenger vehicles and trucks, along with recreational vehicle parking and a dump station. Phase 2 of the project proposes the development of two new quick-serve restaurants, with associated circulation and parking in the western portion of the site. A third quick-serve restaurant in the eastern portion of the site would be located in a building constructed during Phase 1.
The current General Plan designation for the majority of project site is Highway Commercial, and the current zoning is C-3 – Highway Service Commercial. The proposed development is consistent with the General Plan designation and the zoning. The proposed land uses would require City approval of a Conditional Use Permit for the proposed fueling stations and quick-serve restaurant drive-thrus, along with Site Plan and Design Review.
1.2 Purpose of Initial Study
The California Environmental Quality Act (CEQA) requires that public agencies consider and document the potential environmental effects of the agency’s actions that meet CEQA’s definition of a “project.” Briefly summarized, a “project” is an action that has the potential to result in direct or indirect physical changes in the environment. A project includes the agency’s direct activities as well as activities that involve public agency approvals or funding. Guidelines for an agency’s implementation of CEQA are found in the CEQA Guidelines (Title 14, Chapter 3 of the California Code of Regulations).
Provided that a project is not exempt from CEQA, the first step in the agency’s consideration of its potential environmental effects is the preparation of an Initial Study.
The purpose of an Initial Study is to determine whether the project would involve “significant” environmental effects as defined by CEQA and to describe feasible mitigation Livingston Truck Stop Complex IS/MND 1-2 December 2020
measures that would avoid significant effects or reduce them to a level that would be less than significant. If the Initial Study does not identify significant effects, or if it identifies mitigation measures that would reduce all of the significant effects of the project to a lessthan-significant level, then the agency prepares a Negative Declaration or Mitigated Negative Declaration. If the project would involve significant effects that cannot be readily mitigated, then the agency must prepare an Environmental Impact Report (EIR). The agency may also decide to proceed directly with the preparation of an EIR without preparation of an Initial Study.
The proposed project is a “project” as defined by CEQA and is not exempt from CEQA consideration. The City has determined that the project involves the potential for significant environmental effects and requires preparation of this Initial Study. The Initial Study describes the proposed project and its environmental setting, it discusses the potentially significant environmental effects of the project, and it identifies feasible mitigation measures that would avoid the potentially significant environmental effects of the project or reduce them to a level that would be less than significant. The Initial Study considers the project’s potential for significant environmental effects in the following subject areas:
Aesthetics
Agricultural Resources
Air Quality
Biological Resources
Cultural Resources
Energy
Geology and Soils
Greenhouse Gas Emissions
Hazards and Hazardous
Materials
Hydrology and Water Quality
Land Use and Planning
Mineral Resources
Noise
Population and Housing
Public Services
Recreation
Transportation/Traffic
Tribal Cultural Resources
Utilities and Service Systems
Wildfire
Mandatory Findings of Significance
The Initial Study concluded that the project would have significant environmental effects, but recommended mitigation measures would reduce all these effects to a level that would be less than significant. As a result, the City has prepared a Mitigated Negative Declaration and notified the public of the City’s intent to adopt the Initial Study/Mitigated Negative Declaration. A copy of the City’s Notice of Intent is shown just inside the cover of this document. As of the distribution of the IS/MND for public review, the applicant has accepted all the recommended mitigation measures. The time available for comment on the IS/MND is shown in the Notice of Intent.
1.3 Environmental Evaluation Checklist Terminology
The project’s potential environmental effects are evaluated in the Environmental Evaluation Checklist shown in Chapter 3.0. The checklist includes a list of environmental considerations against which the project is evaluated. For each question, the City determines whether the project would involve: 1) a Potentially Significant Impact, 2) a Livingston Truck Stop Complex IS/MND 1-3 December 2020
Less Than Significant Impact with Mitigation Incorporated, 3) a Less Than Significant Impact, or 4) No Impact.
A Potentially Significant Impact occurs when there is substantial evidence that the project could involve a substantial adverse change to the physical environment, i.e., that the environmental effect may be significant, and mitigation measures have not been defined that would reduce the impact to a less than significant level. If there are one or more Potentially Significant Impact identified in the Initial Study, an EIR is required. No Potentially Significant Impacts have been identified in this IS/MND.
An environmental effect that is Less Than Significant with Mitigation Incorporated is a Potentially Significant Impact that can be avoided or reduced to a level that is less than significant with the application of defined mitigation measures. This IS/MND identifies several impacts that are Less than Significant with Mitigation Incorporated.
A Less Than Significant Impact occurs when the project would involve effects on an area of environmental concern, but the project would not involve a substantial adverse change to the physical environment, and no mitigation measures are required. This IS/MND identifies many impacts that are considered Less than Significant.
A determination of No Impact is self-explanatory. This IS/MND identifies several areas of environmental concern in which the project would have No Impact on the physical environment.
Some existing plans, ordinances, and regulatory requirements that have been established by the City and other agencies with jurisdiction, and which are routinely implemented in conjunction with new development, function as measures that mitigate environmental impacts. These are described in this IS/MND as a part of the existing regulatory setting, along with how they would reduce or avoid the project’s environmental effects. Where these regulatory requirements are not sufficient to reduce or avoid the project’s environmental effects, this IS/MND describes additional mitigation measures needed to address the project’s environmental impacts. These additional mitigation measures, which the City should incorporate as part of the project, are described in Chapter 3.0 and are listed in Table 1-1. As of the publication of the Notice of Intent for this project, these mitigation measures have been accepted by the project applicant.
1.4 Summary of Environmental Effects and Mitigation Measures The following pages contain Table 1-1, Summary of Impacts and Mitigation Measures.
Table 1-1 summarizes the results of the Environmental Checklist Form and associated narrative discussion of the project’s potential environmental effects in Chapter 3.0. The potential environmental impacts of the proposed project are summarized in the left-most column of this table. The projected level of significance of each impact without additional mitigation is indicated in the second column. If additional mitigation is required, mitigation Livingston Truck Stop Complex IS/MND 1-4 December 2020
measures proposed to avoid or minimize significant environmental effects are shown in the third column. The fourth column shows the significance of the impact after mitigation measures are applied.
BaseCamp
Figure 1-1
BaseCamp Environmental REGIONAL LOCATION MAP
San Diego Imperial
Orange
Riverside
San Bernardino
Ventura Los Angeles
Santa Barbara
Kern San Luis
Obispo
Inyo
Tulare
Kings Monterey
Fresno
San
Benito
Mono
Madera
Mariposa
Tuolumne
Calaveras
Amador
El Dorado
Sacramento
Alpine
Santa
Clara
San
Joaquin
Contra
Costa
Merced
Marin
Napa
Yolo
Solano
Sutter
Placer
Nevada
Sierra
Plumas
Glenn Butte
Lake
Mendocino
Tehama
Colusa Yuba
Sonoma
Stanislaus Alameda
Santa Cruz
San Mateo
San Francisco
www.csac.counties.org
PROJECT LOCATION
D@lhi
Cressey
W1nton
Ar@na
I
BaseCamp
Figure 1-2
BaseCamp Environmental STREET MAP
PROJECT SITE
;
5:1!
V4aJnut Ave
J
Ill
HSt 5-
L
0 !II
i
!iQ
~
DSt
'fl :;c :::T
!!J I
3 ..
-
it
"'
:::
Ill
I
Burgun Dr
,, ~ S"
s.
.!i'
SI
Zlnfand.el Dt
Johannisburg Dr
Peach A\le
Cforet
Bhi:c:k Pine Way -~
9 chS
Walm..1il:Ave
Tehama Dr
Ill
.a
Wa!i:efield
Trigger ln
Sll\lerln
Aull")' Ln
Peach Ave
BaseCamp
Figure 1-3
BaseCamp Environmental USGS MAP
PROJECT SITE
j
-
23 ..
iii
BaseCamp
Figure 1-4
BaseCamp Environmental Aerial Photo
PROJECT SITE
SOURCE: Google Maps
Figure 1-5
BaseCamp Environmental ASSESSOR PARCEL MAP
SOURCE: Merced County Assessor Parcel Oce
Assessor # 023-060-010-000
Assessor # 023-070-013-000
8 eusr.-.·ESS
l,j jijJ-lW.4 "9 !.,~
jij~
jtill
un
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-10 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
3.1 AESTHETICS
a) Scenic Vistas LS None required -
b) Scenic Resources NI None required -
c) Visual Character and Quality LS None required -
d) Light and Glare LS None required -
3.2 AGRICULTURE AND FORESTRY RESOURCES
a) Farm Land Conversion NI None required -
b) Agricultural Zoning and Williamson Act NI None required - c, d) Forest Land Conversion and Zoning NI None required - e) Indirect Conversion of Farmland of Forest Land NI None required -
3.3 AIR QUALITY
a) Air Quality Plan Consistency LS None required -
b) Cumulative Emissions LS None required -
c) Exposure of Sensitive Receptors to Pollutants LS None required - d) Odors and Other Emissions LS None required -
3.4 BIOLOGICAL RESOURCES
a) Effects on Special-Status Species LS None required - b) Riparian and Other Sensitive Habitats NI None required - TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-11 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
c) Wetlands NI None required -
d) Fish and Wildlife Movement NI None required -
e) Local Biological Requirements LS None required -
f) Conflict with Habitat Conservation Plans NI None required -
3.5 CULTURAL RESOURCES
a) Historical Resources NI None required -
b) Archaeological Resources PS CULT-1: If any subsurface cultural resources are encountered during construction of the project, all
construction activities in the vicinity of the encounter shall be halted until a qualified archaeologist can examine these materials, make a determination of their significance and, if significant, recommend further mitigation measures that would reduce potential effects to a level that is less than significant. Recommended measures could include, but are not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The City of Livingston Community Development Department shall
be notified, and the project developer shall be responsible for retaining qualified professionals, implementing
recommended mitigation measures and documenting
mitigation efforts in a written report to the City’s
Community Development Department, consistent with the
requirements of the CEQA Guidelines.
LS
c) Human Burials PS CULT-2: If project construction encounters evidence of human burial or scattered human remains, the contractor shall immediately notify the County Coroner and the City, which shall in turn notify the appropriate tribal
representatives. The City shall notify other federal and LS
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-12 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
State agencies as required. The City will be responsible for compliance with the requirements of California Health and Safety Code Section 7050.5 and with any direction provided by the County Coroner. If the human remains are
determined to be Native American, the County Coroner
shall notify the Native American Heritage Commission,
which will notify and appoint a Most Likely Descendant.
The Most Likely Descendant shall work with the City and a qualified archaeologist to decide the proper treatment of the human remains and any associated funerary objects in accordance with California Public Resources Code Sections 5097.98 and 5097.991. Avoidance is the preferred means
of disposition of the burial resources.
3.6 ENERGY
a) Project Energy Consumption LS None required -
b) Consistency with Energy Plans LS None required -
3.7 GEOLOGY AND SOILS
a-i) Fault Rupture Hazards NI None required -
a-ii, iii) Seismic Hazards LS None required -
a-4) Landslides NI None required -
b) Soil Erosion PS GEO-1: Prior to commencement of construction activity, the developer shall prepare and implement a Storm Water Pollution Prevention Plan (SWPPP) for the project and file a Notice of Intent with the State Water Resources Control Board (SWRCB) in compliance with the Construction
General Permit and City of Livingston storm water
requirements. The SWPPP shall be available on the
LS
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-13 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
construction site at all times. The developer shall
incorporate an Erosion Control Plan consistent with all applicable provisions of the SWPPP within the site
improvement and building plans. The developer also shall submit the SWRCB Waste Discharger’s Identification
Number to the City prior to approval of development or
grading plans.
c) Geologic Instability LS None required -
d) Expansive Soils NI None required -
e) Adequacy of Soils for Sewage Disposal NI None required - f) Paleontological Resources and Unique Geological
Features
PS GEO-2: If any subsurface paleontological resources are encountered during construction of the project, all
construction activities in the vicinity of the encounter shall be halted until a qualified paleontologist can examine these materials, make a determination of their significance and, if significant, recommend further mitigation measures that would reduce potential effects to a level that is less than significant. Recommended measures may include, but are
not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The City of Livingston Community Development Department shall
be notified, and the project developer shall be responsible for retaining qualified professionals, implementing
recommended mitigation measures and documenting
mitigation efforts in a written report to the Community Development Department, consistent with the
requirements of the CEQA Guidelines.
LS
3.8 GREENHOUSE GAS EMISSIONS
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-14 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
a, b) Project GHG Emissions and Consistency with
GHG Reduction Plans.
LS None required -
3.9 HAZARDS AND HAZARDOUS MATERIALS
a, b) Hazardous Material Transport, Use, and
Potential Release
LS None required -
c) Hazardous Materials Releases near Schools NI None required - d) Hazardous Materials Sites NI None required -
e) Public Airport Operations NI None required -
f) Emergency Response and Evacuations LS None required - g) Wildland Fire Hazards LS None required -
3.10 HYDROLOGY AND WATER QUALITY
a) Surface Waters and Water Quality PS HYDRO-1: The developer shall submit a Storm Water Quality Plan for the project that shall include postconstruction Best Management Practices (BMPs) as required by the City’s Storm Water Management Program.
The Storm Water Quality Plan shall be reviewed and
approved by the City of Livingston Public Works
Department prior to approval of project improvement
plans.
HYDRO-2: If required, the developer shall execute a
Maintenance Agreement with the City for stormwater
BMPs prior to receiving a Certificate of Occupancy. The developer shall remain the responsible party and provide funding for the operation, maintenance and replacement
LS
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-15 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
costs of the proposed treatment devices built for the
project.
HYDRO-3: The developer shall comply with applicable
requirements of, and pay all associated fees as required by, the City’s Storm Water Pollution Prevention Program as set forth in its NPDES Storm Water Permit.
b) Groundwater Supplies and Recharge LS None required - c-i, -ii) Drainage Patterns LS None required -
c-iii) Runoff LS None required -
c-iv) Flood Flows NI None required -
d) Other Flooding Hazards LS None required -
e) Water Quality and Groundwater Sustainability
Plans
NI None required -
3.11 LAND USE AND PLANNING
a) Division of Established Communities NI None required - b) Conflicts with Plans, Policies and Regulations
Mitigating Environmental Effects
LS None required -
3.12 MINERAL RESOURCES
a, b) Availability of Mineral Resources NI None required -
3.13 NOISE
a) Exposure to Noise Exceeding Local Standards LS None required TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-16 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
b) Exposure to Groundborne Noise LS None required -
c) Public Airport and Private Airstrip Noise NI None required -
3.14 POPULATION AND HOUSING
a) Population Growth Inducement LS None required -
b) Displacement of Housing or People NI None required -
3.15 PUBLIC SERVICES
a) Fire Protection LS None required -
b) Police Protection LS None required -
c) Schools LS None required -
d, e) Parks and Other Public Facilities LS None required -
3.16 RECREATION
a, b) Recreational Facilities LS None required -
3.17 TRANSPORTATION/TRAFFIC
a) Conflict with Applicable Plans, Ordinances and
Policies
PS TRANS-1: The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/Campbell Boulevard intersection.
TRANS-2: The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 southbound ramps.
LS
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-17 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
The project applicant or successors in interest shall be required to pay fair-share costs of preparing a preliminary Intersection Control Evaluation report to provide a
screening assessment of the feasibility of a roundabout or traffic signal at the SR 99 ramps intersections.
TRANS-3: The project applicant or successors in interest shall be required to pay fair-share costs of the addition of an eastbound right-turn lane, approximately 200 feet in length, on Campbell Boulevard with right turn overlap
phases on the northbound-to-eastbound and eastbound-tosouthbound movements.
TRANS-4: The project applicant or successors in interest shall install frontage improvements along Campbell
Boulevard, including sidewalks, during Phase 1
development of the project site (see Mitigation Measure b) Conflict with CEQA Guidelines Section
15064.3(b)
LS None required -
c) Traffic Hazards PS TRANS-5: Improvements to the Hammatt Avenue/ Campbell Boulevard intersection shall be designed to
accommodate STAA trucks, and the project shall contribute its fair share to the cost of those features. Project access shall be designed to accommodate STAA trucks. Phase 1
shall contribute its fair share to the cost of a Caltrans STAA route designation application to be completed by the City and shall contribute its fair share to the cost of
improvements needed to accommodate STAA trucks.
LS
d) Emergency Access LS None required -
3.18 TRIBAL CULTURAL RESOURCES
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-18 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
a, b) Tribal Cultural Resources PS Mitigation Measures CULT-1 and CULT-2. LS
3.19 UTILITIES AND SERVICE SYSTEMS
a) Relocation or Construction of Utility Facilities LS None required - b) Water Supplies LS None required -
c) Wastewater Treatment Capacity LS None required -
d) Solid Waste Services LS None required -
e) Compliance with Solid Waste Regulations NI None required -
3.20 WILDFIRE
a) Emergency Response Plans and Emergency
Evacuation Plans
LS None required -
b) Exposure of Project Occupants to Wildfire
Hazards
NI None required -
c) Installation and Maintenance of Infrastructure NI None required - d) Risks from Runoff, Post-Fire Slope Instability, or
Drainage Changes
NI None required -
3.21 MANDATORY FINDINGS OF SIGNIFICANCE
a) Findings on Biological and Cultural Resources PS Mitigation measures in Sections 3.4 and 3.5. LS b) Findings on Individually Limited but
Cumulatively Considerable Impacts
PS CUMUL-1: The project applicant or successors in interest shall be required to pay fair-share costs of improvements at the Hammatt Avenue/Campbell Boulevard intersection
as described in Mitigation Measures TRANS-1 and TRANSLS TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-19 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
3, along with an addition of a westbound left-turn lane on Campbell Boulevard east of Hammatt Avenue, a conversion of the southbound right-turn lane to a through/right-turn lane, and the addition of a northbound-to-eastbound
overlap phase.
CUMUL-2: The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 southbound ramps
as described in Mitigation Measure TRANS-2, along with
the construction of a southbound right-turn lane on
Hammett Avenue that extends to Campbell Boulevard.
CUMUL-3: The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/F Street intersections.
CUMUL-4: The project applicant or successors in interest shall select and implement one of two alternatives related to traffic queuing at the western driveway:
1) Reconfiguration of the westbound Campbell Boulevard
approach to allow left turns from two lanes. This change would equalize traffic volumes in each lane and reduce the queue lengths. This would require that the layout of the Hammatt Avenue/Campbell Boulevard intersection be
wider to accommodate the concurrent turning paths of two STAA trucks. The project applicant or successors in interest shall be required to pay fair-share costs of improvements proposed by this alternative.
2) Left turns at the western driveway shall be prohibited. If determined to be needed by the City, the project
TABLE 1-1
SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Livingston Truck Stop Complex IS/MND 1-20 December 2020 LEGEND: NI = No Impact; LS = Less Than Significant; PS = Potentially Significant Potential Impact
Significance
Before Mitigation
Measures Mitigation Measures
Significance
After Mitigation
Measures
proponents shall fund construction of a median treatment or other measure acceptable to the City to prohibit left turns.
c) Findings on Adverse Effects on Human Beings PS Mitigation measures for traffic impacts. LS Livingston Truck Stop Complex IS/MND 2-1 December 2020
2.0 PROJECT DESCRIPTION
2.1 Project Location
The 18.9-acre project site is located at the southeast corner of the intersection of Campbell Boulevard and Hammatt Avenue in northeastern Livingston, adjacent to SR 99 at the Hammatt Avenue interchange (see Figures 1-1 to 1-5). The project is located on three existing parcels identified as Assessor's Parcel Number (APN) 023-060-10, 023-070-012 and 023-070-013. The project would occupy only the portion of APN 023-060-10 located west of Campbell Avenue; the City is currently considering an administrative request for a Lot Line Adjustment (City Permit #2020-02) that will separate the project site portion of this parcel from the portion located east of Campbell Avenue.
The site is located on the USGS Cressey, California, 7.5-minute quadrangle map within Section 25, Township 6 South, Range 2 East, Mt. Diablo Base and Meridian. The approximate latitude and longitude of the project site are 37° 23’ 05” North and 120° 42' 35" West, respectively.
2.2 Project Details
The project proposes to develop a freeway commercial site of approximately 18.9 acres as a truck stop, which would provide fuel, food, and maintenance services for commercial truck drivers; fuel, food, drinks, and other products for other SR 99 travelers; and convenience commercial services for residents in the vicinity. Currently, existing freeway services along SR 99 in Livingston are limited to existing development at the Winton Parkway interchange. In addition to the proposed project, the City has approved another highway commercial development across Hammatt Avenue from the site at the southwest corner of the intersection of Campbell Boulevard and Hammatt Avenue.
Project development would consist of two phases:
Phase 1
Phase 1 of the proposed project would be centered around an approximately 13,030 square foot travel center building that would include a convenience store, two quick-serve restaurants, restrooms, showers, a trucker’s lounge, and administrative offices. A drivethru lane would be provided adjacent to one of the quick-serve restaurant spaces. Outdoor seating would be installed in the area facing the truck service area. On the opposite side of the travel center building, a fuel dispensing area, covered by a canopy approximately 9,720 square feet in area, would be installed to serve mainly passenger automobiles. There would be ten dispensing stations in the area, each with two pumps, for a total of 20 dispensing pumps. Four aboveground storage tanks for automobile fuel would be installed in the southern portion of the project site. Three tanks would hold approximately 12,000 gallons, while the remaining tank would hold 8,000 gallons.
Livingston Truck Stop Complex IS/MND 2-2 December 2020
A truck service area for commercial trucks would be located east of the travel center building. This area would include nine diesel fuel dispensing stations, each with two pumps, for a total of 18 dispensing pumps. A canopy approximately 4,275 square feet in area would cover the dispensing stations. Adjacent to and immediately south of the dispensing area would be a CAT scale – a totally automated, full-length platform scale for weighing trucks. Next to the CAT scale would be four aboveground storage tanks, each holding approximately 12,000 gallons of diesel fuel.
A commercial building approximately 7,200 square feet in floor area would be located east of the truck fueling area. Approximately 4,200 square feet of this building would accommodate a truck tire center with two service bays and office and storage space. The remaining 3,000 square feet would be available for development of another quick-serve restaurant in Phase 2. Other features of the Phase 1 project include a fenced dog park and a recreational vehicle dump station, located south of the travel center building.
The remainder of the Phase 1 area would include circulation aisles and parking, including drive-through aisles for the automobile and truck fueling areas. A total of 86 parking spaces would be available for passenger vehicles in the travel center area, along with four spaces for disabled persons. Ten additional spaces would be provided for recreational vehicles, along with a dump station along the southern boundary of the project site for disposal of sewage. A total of 127 parking spaces would be available for commercial trucks in the truck service area. Site access would be provided by four proposed driveways off Campbell Avenue. Three of these driveways would provide access to the truck service area, while the remaining driveway would provide access for passenger vehicles.
The project would include frontage improvements along Campbell Avenue in accordance with City standards for a four-lane minor arterial. This would include two vehicle lanes approximately 12 feet in width in each direction, for a total of four lanes. It would also include a median left-turn lane approximately 16 feet in width, and two bike lanes approximately eight feet in width, one on each side of the road. Approximately 15 feet on each side of the improved Campbell Avenue would be used for pedestrian pathways and landscaping.
The project proposes the relocation of an existing detention basin from the western portion of the project site to the southeastern corner (Figure 2-3). The relocated basin will be sized as required to replace the capacity of the existing storm water detention basin and to accommodate additional runoff generated by proposed development of the project site.
The project would install new water and wastewater lines connecting to existing City facilities. The project water system would connect to the City system in two places: an existing line beneath adjacent Hammatt Avenue and the other at an existing line beneath Dwight Way to the east. The project wastewater line would connect to an existing main beneath Dwight Avenue to the east.
Livingston Truck Stop Complex IS/MND 2-3 December 2020
Phase 2
Phase 2 proposes the development of two additional quick-serve restaurants, each approximately 2,800 square feet in floor area, at the western end of the project site. An additional quick-serve restaurant would be located in the tire center building in the eastern portion of the site constructed during Phase 1. Each quick-serve restaurant would have a drive-thru lane and required circulation and parking, including 40 passenger vehicle parking spaces, 6 compact automobile spaces, and 2 spaces for disabled persons. An additional driveway off Campbell Avenue would be installed to provide access to this portion of the development.
Table 2-1 summarizes the total buildout of the project site after the two phases of development.
TABLE 2-1
PROJECT SITE DEVELOPMENT AT BUILDOUT
Proposed Development Units
Phase 1
Central building 13,030 square feet
Convenience store/restrooms
Quick-serve restaurants
Tire center building 7,200 square feet
Tire center 4,200 square feet
Phase 2 quick-serve restaurant 3,000 square feet
Automobile fuel dispensing area 20 fuel pumps
Truck fuel dispensing area 18 fuel pumps
Automobile parking spaces 100 spaces*
Truck parking spaces 127 spaces
Phase 2
New quick-serve restaurants 5,600 square feet
Parking spaces 96 spaces
* Includes 4 spaces for disabled persons and 10 recreational vehicle spaces.
Livingston Truck Stop Complex IS/MND 2-4 December 2020
The project would be landscaped in accordance with City standards. A preliminary landscaping plan for the project site is shown on Figure 2-3. Street trees would be planted along the Campbell Avenue site frontage, and an evergreen hedge with large-spreading trees would be installed along the SR 99 frontage. Other trees and shrubs would be installed throughout the development. A lawn would be installed in the dog park area. The landscape and associated irrigation system would be designed to comply with the City's Water Efficient Landscape Ordinance.
2.3 Permits and Approvals
The current City General Plan designations for the project site are Highway Commercial, Service Commercial. The current zoning is C-3, Highway Service Commercial. The proposed project is consistent with the existing General Plan designations and zoning.
The project development would require approval of a Conditional Use Permit (CUP) by the City Council for the fuel dispensing stations and the quick-serve restaurants with drivethru lanes. It also would require site plan approval and design review by the City Council, Should the project be approved, building and grading permits would need to be obtained from the City, but these permits would not require City Council approval.
Installation of proposed fuel dispensing pumps would require permits from the San Joaquin Valley Air Pollution Control District (SJVAPCD). Aboveground storage tanks would require preparation of spill plans consistent with U.S. Environmental Protection Agency (EPA) regulations. Installation of underground storage tanks would require approval from the Underground Storage Tank Program of the Central Valley Regional Water Quality Control Board (RWQCB). Other permits or approvals that may be required from other agencies include a Construction General Permit from the State Water Resources Control Board (SWRCB).
Figure 2-1A
BaseCamp Environmental SITE PLAN OVERVIEW
PRELIMINARY
HAWKINS & ASSOCIATESENGINEERING, INC.436 MITCHELL ROADMODESTO, CA. 95354PH: (209) 575 - 4295FX: (209) 578 - 4295 DATE SYM. DESCR
CHK:
BY:
DATE:
OF
SHEET
C1
DATE: RODRICK H. HAWKIN
ANDREW S. FOX
SGM MOONGLO INC.
PROPOSED TRAVEL CENTER
LIVINGSTON, CALIFORNIA
6 3486
2020-09-11 PLANNING EXHIBITS FOR:
SGM - MOONGLO INC.
PROPOSED TRAVELCENTER
CAMPBELL BLVD, LIVINGSTON, CA 95334
OVERALL SITE PLAN MTS
VICINITY MAP RHH
PROJECT SITE HWY 99
LIVINGSTON, CA
DWIGHT WA
9 CAMPBELL AVE
TEERTSF
TEERTSD
C1 OVERALL SITE PLAN
C2 EXISTING TOPOGRAPHY PLAN
C3 ENLARGED SITE PLAN
C4 ENLARGED SITE PLAN
C5 ENLARGED SITE PLAN
C6 COMPOSITE UTILITY PLAN
OWNER INDEX
SGM MOONGLO INC.
CONTACT: GOLDY SINGH
2120 POND BRANCH ROAD
GILBERT, CA 29054
PHONE: (803) 657-5535
HAMMETT AVENUE
HIGHWAY 99 NORTH BOUND
HIGHWAY 99 SOUTH BOUND
INDUSTRIAL DRIVE
CAMPBELL AVENUE
CAMPBELL AVENUE
DWIGHT WAY
SOUTHERN PACIFIC RAILROAD
SOURCE: Hawkins & Associates Engineering, Inc.
WEST SECTION
MIDDLE SECTION
EAST SECTION
Figure 2-1B
BaseCamp Environmental SITE PLAN, WEST SECTION
/
/
/
,/'
,/ '
\
)
\
\
~
~ lirelHWA'fff
~ Ii r · , r '-..1:1'
.,I',,,,··
J,L------
----,, :r = = ~-7Jr;~~-:•~-~-:~~--s··=-== ..~
0 ff, -- --
-
_..._ -....!!!!.!!:..= ---
Figure 2-1C
BaseCamp Environmental SITE PLAN, MIDDLE SECTION
\
~ .,,.,,,,,,...,,"' - '1FJ!TC>
0 RklffWAY99,
/ --..... __ .._ / ,'
-.. __ -~ -- ✓
.............. ~ ...........
/
•., ,,/'
-,✓-
/
_,/
/
·, ..
-,
•
-.,
, '
/
'
,...,. C4
C6
6 Figure 2-1D
BaseCamp Environmental SITE PLAN, EAST SECTION
0 0
___ ..... - ------- ..... -------- .... ---------
------.,. - -·-------
----
------------
ST-8
_______ .....
----- --------
-........ -
~ ---
I
i
I
I
f---/ ____Ji
~- I ... cs I 6 !
Figure 2-2
BaseCamp Environmental TRAVEL CENTER BUILDING ELEVATIONS -$1i''~'-
-$W'~F-
·$i:lh:!:;rM'-
-$r.f.-a.;-~ ·-
-Wrn,-
-$f.5'~ 'f{-
-$ft"i:;&;Vr'-
~-t,IQ~ ·-
~;-ll.00.-
~ -~ - -$W'~ W-
~ ii.1f.f·-
~-Fl.0Cfl-
-$it:-%:.¥--
~
-$i/r';f...,."fi'-
-$W'£"J,'-
-$M--,~l~ •-
-w~-fl.OOA-
Figure 2-3
BaseCamp Environmental PRELIMINARY LANDSCAPE PLAN
Smol l- 1~1,:,,,,,ft r...
~e<'luM1l"°9ponJo,p;a,.co"'°
S.--nmlnlrCjlulo~1soaca::la140
o.c.
H I GHWAY 99
~~oll-11)<..:.ding
-!Vff!lhNg,tto
pculdr,go,..,
Gonrin-..-g,_
l-'!!dgeobngH",g""""'9'
-··
••- ,-•-----•-----•-•----•--••-... ,_..,.,u __ ..,..,,_111 __ ,.., __ b_,_ __ l'nl_dfla-. ~-1N-,v-. .. wo11 ...... __ .,1!,aQy, ""'" .........
--.. ~-,,...,,,.,."""lh1'11..,...iol f0'\dft>Mal .. Cllrftl""..,.i:-.z.n. H!l "" ~--lllf---lrd--'--.... ___ IW!tf ___ .... ................. p,,..-1or1111 1...-_.....-c1 ....... The....._ __ ""Vll""'J _ _,.....,_ .. ""_....t .... Cflllall..l.irvn,r(& __ .....,_ _...., ~ l _____ h_al,...._INl~ .. -
al.,_lldt:,,N-•INl-,c:.llll'-------,.-11 ......,_.,..,u.._....r,im:1~--- lrtl'........,,j e--,pine,rllrMl,ol..,..th.o
l-'"17MOY9'~-tobe
k>mladoba..!M high_.ll,..
Livingston Truck Stop Complex IS/MND 3-1 December 2020
3.0 ENVIRONMENTAL CHECKLIST FORM
3.1 AESTHETICS
Except as provided in Public Resources Code Section 21099, would the project:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
c) Substantially degrade the existing visual character or quality of the site and its surroundings?
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
NARRATIVE DISCUSSION
Environmental Setting
The project site is a vacant parcel containing mostly grasses and weeds. The site is in a developing but largely vacant area near the northeastern Livingston city limits, which has a mix of urban development and vacant land. Beyond the City limits, land is used primarily for agriculture. The project site is adjacent to the SR 99 freeway and east of the Hammatt Avenue interchange.
Views toward the south and west over the relatively flat site and surrounding lands are limited by the SR 99 and Hammatt Avenue fill structures, which extend approximately 20 feet above the site grade, along with existing development across SR 99. Views to the north across Campbell Boulevard include agricultural fields and a light industrial development.
Distant views west, further north, and east are limited by existing residential and commercial development and associated tree growth.
Existing lighting in the project vicinity consists of pole lights along SR 99 at ramp intersections and in freeway merge areas. The intersection of Campbell Boulevard and Hammatt Avenue is lighted. Other lighting consists mainly of security and street lighting in nearby residential, commercial, and light industrial development.
Livingston Municipal Code Section 5-4-4 sets standards for landscaping. Landscaping shall be in scale with adjacent buildings and be of appropriate size at maturity to accomplish its intended purpose. Portions of a site not utilized for structures, parking, v
v
v
v
Livingston Truck Stop Complex IS/MND 3-2 December 2020
circulation, storage, or other uses, shall be landscaped. Parking lots shall incorporate landscaping for all areas not used for vehicle storage, access, or circulation.
Livingston Municipal Code Section 5-4-6 sets performance standards for land uses in commercial and industrial zones, including the C-3 zone applied to the project site. Section 5-4-6(A)(1) states that odors, glare, or heat created by or resulting directly or indirectly from any use shall not be perceptible at any point beyond the lot boundaries where it abuts residential districts.
As required by Livingston Municipal Code Section 5-6-7, an application for Site Plan and Design Review is required for new development within the C-3 zone. The purpose of this review is to permit the city to evaluate site plans and designs of new and existing structures to assure compatibility, harmony in appearance in neighborhoods, reduction of negative aesthetic impacts and orderly development of the community. The City has adopted the Design Guide for Development. The Design Guide governs the physical design of development, including site planning, architecture, use of open spaces, lot configurations, circulation, and similar issues. The City Council approves site plans and design review, with the Livingston Planning Commission making recommendations.
Environmental Impacts and Mitigation Measures
a) Scenic Vistas.
The project involves the construction of mainly truck and passenger vehicle fueling and truck service facilities, quick-serve restaurants, and related site improvements. These single-level structures have the potential to partially obstruct distant views. However, as noted, these views are already substantially obstructed by the existing freeway fills and other surrounding development. Proposed structures would be consistent in height with other commercial and residential buildings in the vicinity and would not result in a significant effect on views.
The Merced County General Plan notes that scenic vistas in the County, where available, include views of the Coast Ranges to the west, the Sierra Nevada to the east, and the corridors of the Merced and San Joaquin Rivers (Merced County 2013). The project site is not near any of the stream corridors, and distant views of the mountain ranges are limited as described above. Project impacts on scenic vistas would be less than significant. b) Scenic Resources.
There are no scenic resources on or in the immediate vicinity of the project site. The site is a vacant parcel mostly covered with grasses and weeds and surrounded by transportation facilities. The project site is flat and lacking in notable features, other than a few trees along Campbell Boulevard. There are no substantial aesthetic resources in the project vicinity, including natural landscapes, tree groves, or stream corridors.
There are two designated State scenic highways in Merced County: Interstate 5 from the Stanislaus County Line to State Route (SR) 152 (14.9 miles), and SR 152 from Interstate 5 to the Santa Clara County Line (13.8 miles). (Caltrans 2018). Both scenic highways are in western Merced County; neither are in the project vicinity. The site is designated and Livingston Truck Stop Complex IS/MND 3-3 December 2020
zoned for commercial use, and the proposed project is consistent with these designations.
The project would have no impact on scenic resources.
c) Visual Character and Quality.
As noted in b) above, the project site has no significant scenic resources. The visual character of the project would be consistent with the mixed urban development, vacant land, and agricultural landscapes in the vicinity. The project would comply with the landscaping provisions of Livingston Municipal Code Section 5-4-4, which would enhance the visual character of the project site. The project also would be subject to Site Plan and Design Review by the City, as specified in Livingston Municipal Code Section 5-6-7, which is intended to reduce negative impacts of non-aesthetic development. Compliance with these provisions of the Municipal Code would make project impacts on visual character and quality less than significant.
d) Light and Glare.
The project would add parking and circulation, signage, and building lighting to a site that currently has no lighting. However, the project is in an urbanizing area designated for highway commercial development and near an existing freeway interchange. Proposed lighting would be similar to lighting at existing and approved commercial and light industrial development in the area.
The City’s Site Plan and Design Review requires a project to identify potentially reflective exterior building materials and their locations in relation to motorists and other persons within sight of the project. Also, site plans must identify any exterior light sources and areas subject to potential off-site illumination. Potential off-site lighting impacts would be evaluated during City site plan review for consistency with Livingston Municipal Code Section 5-4-6(A)(1), which limit glare impacts on any adjacent residential properties.
The project would implement a Lighting Plan that would be consistent with California’s 2019 Building Energy Efficiency Standards, Title 24, Part 6, which includes lighting controls such as the use of light-emitting diode fixtures, time switches, and motion sensors for all exterior lighting. Pole-mounted light fixtures would be appropriately angled to minimize light exposure. Project impacts related to light and glare would be less than significant.
3.2 AGRICULTURE AND FORESTRY RESOURCES
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to nonagricultural use? v
Livingston Truck Stop Complex IS/MND 3-4 December 2020
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?
d) Result in the loss of forest land or conversion of forest land to non-forest use?
e) Involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
NARRATIVE DISCUSSION
Environmental Setting
The project site has been used for agriculture in the past; however, it is currently not in agricultural use. Surrounding lands also show evidence of past agricultural use, but they also are currently vacant. The project site and surrounding lands have been annexed to the City of Livingston and they are designated and zoned for urban development. In recent years, urban development has occurred in the vicinity, and agricultural operations have mostly ceased.
The Important Farmland Maps, prepared by the California Department of Conservation as part of its Farmland Mapping and Monitoring Program, designate the viability of lands for farmland use, based on the physical and chemical properties of the soils and other factors.
The maps categorize farmland, in decreasing order of soil quality, as "Prime Farmland," "Unique Farmland," and "Farmland of Statewide Importance." Collectively, these categories are referred to as “Farmland” in the CEQA Checklist in Appendix G of the CEQA Guidelines and in this document. There are also designations for grazing land and for urban/built-up areas, among others. According to the 2016 Important Farmland Map of Northern Merced County, the project site is designated as Farmland of Local Importance (FMMP 2016). For the purposes of CEQA, the project site is not considered “Farmland.” Environmental Impacts and Mitigation Measures
a) Farmland Conversion.
As noted, the project site is designated by the Farmland Mapping and Monitoring Program as Farmland of Local Importance, which is cultivable land that does not meet the CEQA Guidelines definition of Farmland. Therefore, the project would not convert Farmland to non-agricultural uses. The project would have no impact on Farmland conversion. v
v
v
v
Livingston Truck Stop Complex IS/MND 3-5 December 2020
b) Agricultural Zoning and Williamson Act.
As noted, the project site is designated and zoned for commercial uses. It is not zoned for agriculture. The Williamson Act is State legislation that seeks to preserve farmland by offering property tax breaks to farmers who sign a contract pledging to keep their land in agricultural use. The project site is not under a Williamson Act contract. The project would have no impact related to agricultural zoning or Williamson Act contracts. c, d) Forest Land Conversion and Zoning.
There are no forest lands on the project site or in Merced County. Neither the project site nor lands in the vicinity are zoned as forest or timber lands. The project would have no impact on forest lands.
e) Indirect Conversion of Farmland and Forest Land.
The project site and surrounding lands have been designated and zoned for urban development by the City. Streets and infrastructure have been extended to the area in support of planned development. The project site would connect to existing infrastructure.
The project site and adjacent parcels are designated Farmland of Local Importance, which is not considered Farmland for CEQA purposes. As noted, there are no forest lands in the vicinity. The project would have no impact on indirect conversion of Farmland or forest land.
3.3 AIR QUALITY
Where available, the significance criteria established by the applicable air quality management district or air pollutant control district may be relied upon to make the following determinations. Would the project:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Conflict with or obstruct implementation of the applicable Air Quality Attainment Plan?
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or state ambient air quality standard?
c) Expose sensitive receptors to substantial pollutant
concentrations?
d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-6 December 2020
NARRATIVE DISCUSSION
Environmental Setting
Air Quality Status
The project site is within the San Joaquin Valley Air Basin. The San Joaquin Valley Air Pollution Control District (SJVAPCD), which includes Merced County, has jurisdiction over most air quality matters in the Air Basin. The SJVAPCD is tasked with implementing programs and regulations required by both the federal and California Clean Air Acts. Under their respective Clean Air Acts, both the State of California and the federal government have established ambient air quality standards for six criteria air pollutants: ozone, particulate matter, carbon monoxide, nitrogen dioxide, sulfur dioxide, and lead. The State of California has four additional criteria pollutants under its Clean Air Act.
Table 3-1 shows the current attainment status of the Air Basin relative to the federal and State ambient air quality standards for criteria pollutants. Except for ozone and particulate matter, which are discussed below, the Air Basin is in attainment of, or unclassified for, all federal and State ambient air quality standards.
TABLE 3-1
SAN JOAQUIN VALLEY AIR BASIN ATTAINMENT STATUS
Criteria Pollutant
Designation/Classification
Federal Primary Standards State Standards
Ozone - One hour No Federal Standard Nonattainment/Severe Ozone - Eight hour Nonattainment/Extreme Nonattainment
PM10 Attainment Nonattainment
PM2.5 Nonattainment Nonattainment
Carbon Monoxide (CO) Attainment/Unclassified Attainment/Unclassified Nitrogen Dioxide (NOx) Attainment/Unclassified Attainment Sulfur Dioxide (SOx) Attainment/Unclassified Attainment Lead No Designation/Classification Attainment
Hydrogen Sulfide No Federal Standard Unclassified
Sulfates No Federal Standard Attainment
Visibility Reducing Particles No Federal Standard Unclassified Vinyl Chloride No Federal Standard Attainment
Source: SJVAPCD 2020.
Livingston Truck Stop Complex IS/MND 3-7 December 2020
Air Pollutants of Concern
The San Joaquin Valley Air Basin is designated a non-attainment area for ozone. Ozone is not emitted directly into the air. It is formed when reactive organic gases (ROG) and nitrogen oxides (NOx), referred to as “ozone precursors,” react in the atmosphere in the presence of sunlight. Ozone is a respiratory irritant and an oxidant that increases susceptibility to respiratory infections and can cause substantial damage to vegetation and other materials. The SJVAPCD currently has a 2007 Ozone Plan and a 2013 Plan for the Revoked 1-Hour Ozone Standard for the Air Basin to attain federal ambient air quality standards for ozone.
The Air Basin is also designated a non-attainment area for respirable particulate matter, a mixture of solid and liquid particles suspended in air, including dust, pollen, soot, smoke, and liquid droplets. Particulate matter is generated by a mix of rural and urban sources, including agricultural activities, industrial emissions, dust suspended by vehicle traffic, and secondary aerosols formed by reactions in the atmosphere. Health concerns associated with suspended particulate matter focus on those particles small enough to reach the lungs when inhaled; consequently, both the federal and state air quality standards for particulate matter apply to particulates 10 micrometers or less in diameter (PM10) as well as to particulates less than 2.5 micrometers in diameter (PM2.5), which are carried deeper into the lungs.
Acute and chronic health effects associated with high particulate levels include the aggravation of chronic respiratory diseases, heart and lung disease, coughing, bronchitis, and respiratory illnesses in children. The SJVAPCD currently has a 2007 PM10 Maintenance Plan to maintain the Air Basin’s attainment status for federal PM10 ambient air quality standards, and a 2008 PM2.5 Plan for the Air Basin to attain federal PM2.5 ambient air quality standards.
Carbon monoxide (CO) is an odorless, colorless gas that is highly toxic. It is formed by the incomplete combustion of fuels and is emitted directly into the air, unlike ozone. The main source of CO in the San Joaquin Valley is on-road motor vehicles (SJVAPCD 2015). The San Joaquin Valley Air Basin is in attainment/unclassified status for CO; as such, the SJVAPCD has no CO attainment plans. High CO concentrations may occur in areas of limited geographic size ordinarily associated with highly congested traffic - sometimes referred to as “hot spots.”
In addition to the criteria pollutants, the California Air Resources Board has also identified other air pollutants as toxic air contaminants (TACs) - pollutants that may cause acute serious, long-term effects, such as cancer, even at low levels. Diesel particulate matter is the most common TAC, generated mainly as a product of combustion in diesel engines.
Emissions from fuel dispensing are regulated as TACs, as discussed below. Other TACs are less common and are typically associated with industrial activities.
Air Quality Rules and Regulations
As previously noted, the SJVAPCD has jurisdiction over most air quality matters in the Air Basin. It implements the federal and California Clean Air Acts, and the applicable attainment and maintenance plans, through local regulations. The SJVAPCD has developed plans to attain State and federal standards for ozone and particulate matter, Livingston Truck Stop Complex IS/MND 3-8 December 2020
which include emissions inventories to measure the sources of air pollutants and the use of computer modeling to estimate future levels of pollution and make sure that the Valley will meet air quality goals (SJVAPCD 2015). A State Implementation Plan for carbon monoxide has been adopted by the California Air Resources Board (ARB) for the entire state. The SJVAPCD regulations that would be applicable to the project are summarized below.
Regulation VIII (Fugitive Dust PM10 Prohibitions)
Rules 8011-8081 are designed to reduce PM10 emissions (predominantly dust/dirt) generated by human activity, including construction and demolition activities, road construction, bulk materials storage, paved and unpaved roads, carryout and track out and, landfill operations, among others.
Rule 4101 (Visible Emissions)
This rule prohibits emissions of visible air contaminants to the atmosphere and applies to any source operation that emits or may emit air contaminants, including construction.
Rule 9510 (Indirect Source Review)
Rule 9510, also known as the Indirect Source Rule, is intended to reduce or mitigate emissions of NOx and PM10 from new development in the SJVAPCD including construction and operational emissions. This rule requires specific percentage reductions in estimated on-site construction and operation emissions, and/or payment of off-site mitigation fees for required reductions that cannot be met on the project site. Construction emissions of NOx and PM10 exhaust must be reduced by 20% and 45%, respectively. Operational emissions of NOx and PM10 must be reduced by
33.3% and 50%, respectively. The Indirect Source Rule applies to commercial development projects of 2,000 square feet and larger. Based on this criterion, the project would be subject to Rule 9510.
In addition, the SJVAPCD regulates the construction and improvement of facilities with potential air toxic emissions, including fueling stations. Toxic substances in gasoline include benzene, toluene, and naphthalene, among others. SJVAPCD rules applicable to fueling stations include:
Rule 2201 (New and Modified Stationary Source Review Rule) New stationary sources and modifications of existing stationary sources that may emit criteria pollutants must obtain an Authority to Construct and Permit to Operate the proposed facility. Emissions that exceed impact thresholds must include emission controls and may require additional mitigation. To protect local and regional public health and safety, fueling station applications are reviewed under Rule 2201 for compliance with SJVAPCD rules. SJVAPCD review of these applications includes consideration of proposed vapor recovery equipment and whether the controlled volatile organic compound emissions require offsets or trigger public notice requirements.
Livingston Truck Stop Complex IS/MND 3-9 December 2020
Rule 4621 (Gasoline Transfer into Stationary Storage Containers, Delivery Vessels and Bulk Plants)
Rule 4621 prohibits the transfer of gasoline from a delivery vessel into a stationary storage container unless the container is equipped with an ARB-certified permanent submerged fill pipe and ARB certified pressure-vacuum relief valve and utilizes an ARB-certified Phase I vapor recovery system.
Rule 4622 (Transfer of Gasoline into Vehicle Fuel Tanks) Rule 4622 prohibits the transfer of gasoline from a stationary storage container into a motor vehicle fuel tank with a capacity greater than five gallons, unless the gasoline dispensing unit used to transfer the gasoline is equipped with and has in operation an ARB-certified Phase II vapor recovery system.
Environmental Impacts and Mitigation Measures
In 2015, the SJVAPCD adopted a revised Guide for Assessing and Mitigating Air Quality Impacts (GAMAQI). GAMAQI defines an analysis methodology, thresholds of significance, and mitigation measures for the assessment of air quality impacts for land development projects within SJVAPCD’s jurisdiction. Table 3-2 shows the CEQA thresholds for significance for pollutant emissions within the SJVAPCD. The significance thresholds apply to emissions from both project construction and project operations and are independent of toxic emissions associated with fuel storage and dispensing.
TABLE 3-2
ESTIMATED PROJECT CONSTRUCTION AIR POLLUTANT EMISSIONS
Pollutant
SJVAPCD
Significance
Threshold1
Unmitigated
Emissions2
Mitigated
Emissions2
ROG 10 0.13 0.13
NOx 10 0.67 0.67
CO 100 0.62 0.62
SOx 27 <0.01 <0.01
PM10 15 0.06 0.05
PM2.5 15 0.04 0.04
1 Tons per year.
2 Maximum emissions.
Sources: California Emissions Estimator Model v. 2016.3.2; SJVAPCD 2015 Livingston Truck Stop Complex IS/MND 3-10 December 2020 Construction of the project would involve the use of heavy equipment powered by diesel or other internal combustion engines. The California Emissions Estimator Model (CalEEMod) was used to estimate total construction emissions from the proposed project.
The CalEEMod results are shown in Appendix A of this document and in Table 3-2, along with the CEQA thresholds of significance set forth in the GAMAQI. “Mitigated emissions” are those that occur with implementation of SJVAPCD Regulation VIII, which is designed to reduce fugitive dust emissions during construction activities.
Emissions from project operations would primarily be from vehicle trips to and from the project site. Total annual emissions estimated at completion and occupancy of the proposed project, assumed to occur in 2020, are shown in Table 3-3, along with the CEQA thresholds of significance set forth in the GAMAQI. “Mitigated emissions” are the result of the application of project features and regulatory requirements that reduce air pollutant and greenhouse gas (GHG) emissions associated with the project. Section 3.8, Greenhouse Gas Emissions, discusses these features and requirements in more detail.
TABLE 3-3
ESTIMATED AIR POLLUTANT EMISSIONS FROM PROJECT OPERATIONS Pollutant
SJVAPCD
Significance
Threshold
Unmitigated
Emissions
Mitigated
Emissions
ROG 10 2.89 2.80
NOx 10 11.09 10.60
CO 100 19.76 17.74
SOx 27 0.06 0.05
PM10 15 4.42 3.59
PM2.5 15 1.22 1.00
Note: All figures are in tons per year.
Sources: California Emissions Estimator Model v. 2016.3.2; SJVAPCD 2015. a) Air Quality Plan Consistency.
SJVAPCD has attainment plans for ozone and particulate matter, while the State has a CO attainment plan. As indicated in Tables 3-2 and 3-3, project construction and operational emissions would not exceed SJVAPCD significance thresholds for criteria pollutants, except for NOx operational emissions. However, the project would be required to comply with SJVAPCD Rule 9510, which requires reductions of NOx operational emissions by
33.3%. Application of this rule would reduce NOx operational emissions below the SJVAPCD significance threshold. Based on this, the project would be consistent with adopted reduction plans for these pollutants. Project impacts related to air quality plans would be less than significant.
Livingston Truck Stop Complex IS/MND 3-11 December 2020 b) Cumulative Emissions.
The project would contribute emissions of ozone and particulate matter to the San Joaquin Valley Air Basin, which is currently in non-attainment status for these two pollutants.
Although the operational emissions, except for NOx, would not exceed the SJVAPCD significance thresholds (see Table 3-3), the project would contribute emissions in an Air Basin not in compliance with federal and state air quality standards for ozone and particulate matter. Therefore, the project could result in a cumulatively considerable net increase of these two criteria pollutants.
Development proposed by the project is consistent with the land use designations of the Livingston General Plan. The General Plan EIR analyzed the potential impacts of development anticipated in the General Plan on air quality. The EIR noted that if an individual project, such as the General Plan update, results in an incremental contribution to a non-attainment condition, significant cumulative impacts would result. The EIR stated that policies, regulations, and land use measures in the General Plan would reduce impacts, and the EIR notes that emissions are expected to decrease from then-extant conditions due to the use of cleaner fuels and vehicles and more efficient location of complementary land uses. Nevertheless, the EIR concluded that General Plan impacts on air quality were significant and unavoidable (City of Livingston 1999b). In certifying the General Plan EIR in 1999, the City Council adopted a Statement of Overriding Considerations that acknowledged the impact on air quality but found other considerations outweighed the adverse impact. This Statement of Overriding Considerations remains operative.
According to CEQA Guidelines Section 15152(d), where an EIR has been prepared and certified for a plan, any lead agency for a later project pursuant to or consistent with the plan should limit the project EIR or negative declaration to effects which were not examined as significant effects on the environment in the prior EIR, or are susceptible to substantial reduction or avoidance by the choice of specific revisions in the project, by the imposition of conditions, or other means. The cumulative impacts on air quality associated with the project had already been examined in the General Plan EIR, and these impacts were found to not be susceptible to substantial reduction or avoidance by any changes to the project. Therefore, the project’s cumulative impacts on air quality do not require additional consideration under CEQA and are considered less than significant in this analysis.
c) Exposure of Sensitive Receptors to Pollutants.
The project site is in an area of mixed land uses, but most lands in the immediate vicinity of the site are vacant or undeveloped. Residences and care facilities are considered land uses sensitive to air pollutant emissions. The nearest sensitive land use is a residential subdivision more than 1,000 feet to the northwest. As noted, project construction and operational emissions would be below SJVAPCD significance thresholds for criteria pollutants, except for NOx operational emissions. However, these emissions would be reduced below their significance threshold through compliance with SJVAPCD Rule 9510.
Moreover, implementation of applicable SJVAPCD rules and regulations would further reduce emissions, making them even less likely to reach these sensitive land uses in quantities of concern.
Livingston Truck Stop Complex IS/MND 3-12 December 2020 CO hotspots have the potential to expose receptors to emissions that violate state and/or federal CO standards, even if the broader Air Basin is in attainment of these standards. The GAMAQI indicates that a project would create no violations of the carbon monoxide standards if neither of the following criteria are met by (SJVAPCD 2015):
• A traffic study for the project indicates that the Level of Service (LOS) on one or more streets or at one or more intersections in the project vicinity will be reduced to LOS E or F; or
• A traffic study indicates that the project will substantially worsen an already existing LOS F on one or more streets or at one or more intersections in the project vicinity (See Section 3.17, Transportation, for an explanation of LOS).
As noted in Section 3.17, Transportation, the intersections affected by the project are expected to maintain at least the minimum acceptable LOS of C, as set by the City, with the implementation of mitigation measures. Therefore, the project would have no adverse impact related to CO emissions.
Fueling station operations would involve the dispensing of gasoline, which can emit vapors that are considered toxic. SJVAPCD Rules 4621 and 4622 would require the installation of vapor recovery systems, which would reduce the potential exposure of people using fuel pumps to potentially toxic emissions. The SJVAPCD may impose other conditions as warranted as part of its review conducted under SJVAPCD Rule 2201 as needed to prevent adverse air toxics effects on sensitive receptors in the project vicinity. The potential exposure of people to pollutant emissions is considered less than significant. d) Odors and Other Emissions.
Fueling station and restaurant operations may include the emissions of odors associated with the dispensing of fuel and the cooking of food. Fuel odors would be localized and are not expected to spread beyond the fuel dispensing area, particularly since the project would be required to comply with SJVAPCD Rules 4621 and 4622 as discussed above. Cooking odors are not typically considered adverse. As noted in d) above, land uses potentially sensitive to odors are at a substantial distance from the project site which would in any event result in substantial dispersal of odors generated from the project site. Project impacts related to odors would be less than significant.
Livingston Truck Stop Complex IS/MND 3-13 December 2020
3.4 BIOLOGICAL RESOURCES
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife
Service?
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Conservation Community Plan, or other approved local, regional, or state habitat
conservation plan?
NARRATIVE DISCUSSION
Environmental Setting
The project site is relatively flat with sandy soil. Vegetation consists mainly of grasses and weeds, with sparse growth throughout most of the project site and thicker growth along Campbell Boulevard. The City General Plan states that the natural vegetation of the Livingston area historically consisted of vast stretches of savanna traversed by riparian corridors along the Merced River and its tributaries. None of these corridors or corridor remnants are in the project vicinity. Natural vegetation communities in the Livingston vicinity have been all but eliminated as a result of agricultural and urban development. v
v
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-14 December 2020 The reduction of natural vegetation communities has also reduced the amount of suitable habitat for special-status plant and wildlife species. Special-status species are plant or wildlife species that are legally protected under the federal and/or California Endangered Species Act. They are also species considered rare or endangered as defined by CEQA Guidelines Section 15380, such as species identified on Lists 1A, 1B and 2 in the Inventory of Rare and Endangered Vascular Plants of California by the California Native Plant Society, and species that are considered sensitive or of special concern due to limited distribution or lack of adequate information to permit listing or rejection for state or federal status.
According to the Livingston General Plan, some migratory birds do pass through the Livingston area, but Livingston is not a known year-round or seasonal habitat for migratory birds. The project site was inspected by BaseCamp Environmental staff for the presence of wetlands, riparian areas, other sensitive habitats, or indications of special-status species use. The project site does not contain any wetlands, riparian areas, oak trees, sensitive habitats, or indications of use by special-status species.
Environmental Impacts and Mitigation Measures
a) Effects on Special-Status Species.
A search of the California Natural Diversity Database, the results of which are available in Appendix B, indicated the presence of 14 special-status species in the Cressey quadrangle map area, within which the project site is located. Of these species, four are fish species for which no streams are available on the project site. Both plant special-status species require vernal pools or seasonal wetlands, neither of which are found on the project site.
Suitable habitat is not available on the project site for the western pond turtle or for the identified lizard species. The project site contains no elderberry shrubs, which provide habitat for the valley elderberry longhorn beetle. No suitable nesting habitat is available for the tricolored blackbird, and there is no substantial habitat for white-tailed kite and Cooper’s hawk.
The one special-status species that may have more than a transitory occurrence on the project site is Swainson’s hawk, a migratory bird listed as threatened under the California Endangered Species Act. Swainson’s hawks are found in the Central Valley primarily during their breeding season from mid-March to late August; a population is known to winter in the San Joaquin Valley. This species is known to forage in agricultural fields and annual grasslands. However, the quality of foraging habitat on the project site is low and the site is small relative to Swainson’s hawk forging area. There are no large trees close to the site that would be suitable for Swainson’s hawk nesting. Because of this, Swainson’s hawk is unlikely make any substantial use of the project site. Project impacts on specialstatus species would be less than significant. b) Riparian and Other Sensitive Habitats.
There are no streams located on or adjacent to the project site; therefore, the project would not affect stream habitats. Other sensitive habitats that may be found in the San Joaquin Valley include vernal pools, oak woodlands, and native grasslands. The California Natural Livingston Truck Stop Complex IS/MND 3-15 December 2020 Diversity Database search indicated the presence of the Northern Hardpan Vernal Pool community in the Cressey quadrangle map area. However, none of these habitats exist on the project site. The project would have no impact on sensitive habitats. c) Wetlands.
As noted, no wetlands were found on the project site. There are no streams or other Waters of the United States either on or adjacent to the project site. The project would have no impact on wetlands.
d) Fish and Wildlife Movement.
There are no streams either on or adjacent to the project site, so no fish movements would be affected by the project. The site is isolated from wildlife habitat by existing urban development and streets. Site development would not adversely affect wildlife movement.
The lack of foraging habitat and trees would make it unlikely that migratory birds would make substantial use the project site for foraging or nesting. The project would have no impact on fish and wildlife movement.
e) Local Biological Requirements.
Livingston Municipal Code Section 5-4-8 seeks to protect and preserve mature trees on private property. A permit shall be required for the removal of any mature tree measuring at least six inches in diameter, as measured four feet above grade at the base of the tree.
The City requires a five to one (5:1) replacement ratio for removal of any protected tree, although the City has discretion to reduce this ratio if trees larger than the minimum required 24-inch box size are used as replacements. As noted in Section 3.1, Aesthetics, there are a few trees on the project site along Campbell Boulevard. Should these trees meet the criteria, then the provisions of Section 5-4-8 would apply. Project impacts on local biological requirements would be less than significant. f) Conflict with Habitat Conservation Plans.
Habitat Conservation Plans are plans prepared under Section 10 of the federal Endangered Species Act that allow activities that could result in an “incidental take” of listed species to occur, with implementation of measures to mitigate impacts on listed species and to monitor the effectiveness of the mitigation. Natural Community Conservation Plans are California counterparts to Habitat Conservation Plans but are broader in their geographical range and conservation objectives, which include protection of ecosystems. There are no Habitat Conservation Plans, Natural Community Conservation Plans, or similar plans that apply to the project site. The project would have no impact on this issue.
Livingston Truck Stop Complex IS/MND 3-16 December 2020
3.5 CULTURAL RESOURCES
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Cause a substantial adverse change in the significance of a historical resource pursuant to Section 15064.5?
b) Cause a substantial adverse change in the significance of a unique archaeological resource pursuant to Section 15064.5? c) Disturb any human remains, including those interred
outside of formal cemeteries?
NARRATIVE DISCUSSION
Environmental Setting
Prehistoric Era
The City of Livingston lies within the historic territory of the Yokuts, which ranged from the Tehachapi Mountains to modern-day Stockton in the San Joaquin Valley. Section 3.18, Tribal Cultural Resources, discusses the Yokuts in more detail.
Several archaeological surveys had been conducted in the Livingston area prior to and during the preparation of the General Plan EIR. All survey efforts have yielded negative results. The General Plan EIR concluded that the Livingston area was probably never a prehistoric population center, and minor cultural resource sites that probably existed at one time have been largely destroyed by extensive agricultural operations (City of Livingston 1999b).
Historic Era
Livingston was originally named Cressey, after a major landowner on whose property a railroad station was established by the Santa Fe Railroad. Renamed Livingston, reportedly in honor of the explorer Dr. David Livingstone, the first known plat of the town dates from 1872. Livingston became a shipping and supply center for surrounding farms and ranches.
In the early 20th century, the Yamato Colony, an agricultural cooperative founded by Japanese Americans, was established on land between Livingston and the community of Cressey. In 1996, the State Route (SR) 99 bypass around Livingston was completed, thereby eliminating the last traffic signal on SR 99 between Sacramento and Bakersfield (Fimrite 1996). The project site is adjacent to this bypass.
The Livingston General Plan EIR evaluated the potential for significant historical resources in Livingston. Previous studies had identified only two potential historical resources in Livingston: the Livingston Canal in the northern part of Livingston and the Arena Canal v
v
v
Livingston Truck Stop Complex IS/MND 3-17 December 2020 passing through the southern portion of the City. Both canals were considered ineligible for inclusion in the National Register of Historic Places.
The Central California Information Center at California State University Stanislaus conducted a search of records for historical and archaeological resources. Appendix C contains the results of the search. The Central California Information Center noted that the project site has been subject to seven previous cultural resource investigations. There are no formally recorded prehistoric or historic archaeological resources or historic buildings within the immediate vicinity of the project area. The project site has a low sensitivity for the possible discovery of prehistoric or historic resources.
Environmental Impacts and Mitigation Measures
a) Historical Resources.
A records search conducted by the Central California Information Center found no documented historical or archaeological resources in the immediate vicinity of the project site and indicated that the site has a low sensitivity for the possible discovery of prehistoric resources. The project site does fall within the proposed boundaries of the Merced Irrigation District, which was created between 1870-1922; however, there are no recorded resources associated with the District within the project site.
There are no existing structures on the site that might be considered historic. The site and surrounding landscape have been substantially modified by agricultural activities and later by construction of the SR 99 bypass and the adjacent City streets. The project would have no impact on historical resources.
b) Archaeological Resources.
As noted in a) above, a records search conducted by the Central California Information Center found no documented prehistoric resources in the immediate vicinity of the project site. Given past disturbance of the project site by agricultural activities and road development, it is unlikely that any archaeological resources would be found intact.
However, it is conceivable that excavation associated with the project could unearth archaeological materials of significance that are currently unknown. Mitigation described below would establish procedures to address archaeological discoveries if they should occur, which would reduce any potential impacts to a level that would be less than significant.
Mitigation Measures:
CULT-1: If any subsurface cultural resources are encountered during construction of the project, all construction activities in the vicinity of the encounter shall be halted until a qualified archaeologist can examine these materials, make a determination of their significance and, if significant, recommend further mitigation measures that would reduce potential effects to a level that is less than significant. Recommended measures could include, but are not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The City Livingston Truck Stop Complex IS/MND 3-18 December 2020 of Livingston Community Development Department shall be notified, and the project developer shall be responsible for retaining qualified professionals, implementing recommended mitigation measures and documenting mitigation efforts in a written report to the City’s Community Development Department, consistent with the requirements of the CEQA Guidelines.
c) Human Burials.
As with other cultural resources, it is not expected that any human burials, particularly those of Native Americans, would be uncovered by construction on the project site, given its extensive disturbance and distant location from probable Native American settlements (see Section 3.18, Tribal Cultural Resources). However, it is conceivable that excavation associated with the project could uncover a previously unknown burial.
CEQA Guidelines Section 15064.5(e) describes the procedure to be followed when human remains are uncovered in a location outside a dedicated cemetery. All work in the vicinity of the find shall be halted, and the County Coroner shall be notified to determine if an investigation of the death is required. If the Coroner determines that the remains are Native American in origin, then the Coroner must contact the Native American Heritage Commission within 24 hours. The Native American Heritage Commission shall identify the most likely descendants of the deceased Native American, and the most likely descendants may make recommendations on the disposition of the remains and any associated grave goods with appropriate dignity. If a most likely descendant cannot be identified, the descendant fails to make a recommendation, or the landowner rejects the recommendations of the most likely descendant, then the landowner shall rebury the remains and associated grave goods with appropriate dignity on the property in a location not subject to further disturbance.
Mitigation presented below would require compliance with CEQA Guidelines Section 15064.5(e). Implementation of the mitigation measure would ensure that any human remains and associated grave goods encountered during project construction would be treated with appropriate dignity. Project impacts on human remains after mitigation would be less than significant.
Mitigation Measures:
CULT-2: If project construction encounters evidence of human burial or scattered human remains, the contractor shall immediately notify the County Coroner and the City, which shall in turn notify the appropriate tribal representatives. The City shall notify other federal and State agencies as required. The City will be responsible for compliance with the requirements of California Health and Safety Code Section 7050.5 and with any direction provided by the County Coroner. If the human remains are determined to be Native American, the County Coroner shall notify the Native American Heritage Commission, which will notify and appoint a Most Likely Descendant. The Most Likely Descendant shall work with the City and a qualified archaeologist to Livingston Truck Stop Complex IS/MND 3-19 December 2020 decide the proper treatment of the human remains and any associated funerary objects in accordance with California Public Resources Code Sections 5097.98 and 5097.991. Avoidance is the preferred means of disposition of the burial resources.
3.6 ENERGY
Would the project:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Result in potentially significant environmental impacts due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation? b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
NARRATIVE DISCUSSION
Environmental Setting
Electricity and natural gas are major energy sources for residences and businesses in California. In Merced County, electricity consumption in 2016 totaled approximately 3,559 million kilowatt-hours (kWh), of which approximately 2,840 million kWh were consumed by non-residential uses and the remainder by residential uses (CEC 2018a). In 2018, natural gas consumption in Merced County totaled approximately 120 million therms, of which approximately 96 million therms were consumed by non-residential uses and the remainder by residential uses (CEC 2018b).
Motor vehicle use accounts for substantial energy usage. The Merced County Association of Governments (MCAG) estimated total vehicle miles traveled (VMT) within Merced County and its cities were approximately 2,725,000 miles daily in 2016 (MCAG 2018a).
Estimated motor vehicle fuel consumption in Merced County in 2015 was 304,600 gallons of gasoline and 209,600 gallons of diesel fuel per day. Fuel consumption per capita was
1.89 gallons per day (MCAG 2018b).
The State of California has adopted comprehensive energy efficiency standards as part of its Building Standards Code, California Code of Regulations, Title 24. Part 6 of Title 24 is referred to as the California Energy Code. In 2009, the California Building Standards Commission adopted a voluntary Green Building Standards Code, also known as CALGreen, which became mandatory in 2011. CALGreen sets forth mandatory measures, applicable to new residential and nonresidential structures as well as additions and alterations, on water efficiency and conservation, building material conservation, and interior environmental quality. It also mentions energy efficiency, although CALGreen defers to the Energy Code for actions. The City has adopted the 2019 versions of both the California Energy Code and CALGreen.
v
v
Livingston Truck Stop Complex IS/MND 3-20 December 2020 In 2002, California adopted a Renewables Portfolio Standard, and subsequently modified it in 2006 and 2011. Under the 2011 modifications, all electricity retailers in the state must generate 20% of electricity they sell from renewable energy sources (i.e., solar, wind, geothermal, hydroelectric from small generators, etc.) by the end of 2013, 25% by the end of 2016, and 33% by the end of 2020. As of the end of 2017, California derived 30% of its electricity from renewable sources, which is within 3% of the 2020 target and within 20% of the 2030 target (CEC 2018a). In 2015, SB 350 was signed into law, which increased the electricity generation requirement from renewable sources to 50% by 2030. Most recently, in 2018, SB 100 was enacted, which accelerated the schedule for 50% electricity generation from renewable sources to 2026 and set a goal of 60% electrical generation from renewable sources by 2030. It also set the goal that zero-carbon resources will supply 100% of electricity to California by 2045.
Environmental Impacts and Mitigation Measures
a) Project Energy Consumption.
Project construction would involve fuel consumption and use of other non-renewable resources. Construction equipment used for such improvements typically runs on diesel fuel or gasoline. The same fuels typically are used for vehicles that transport equipment and workers to and from a construction site. However, construction-related fuel consumption would be finite, short-term, and consistent with construction activities of a similar character. This energy use would not be considered wasteful, inefficient, or unnecessary.
Electricity may be used for equipment operation during construction activities. It is expected that more electrical construction equipment would be used in the future, as it would generate fewer air pollutant emissions. This electrical consumption would be consistent with construction activities of a similar character; therefore, the use of electricity in construction activities would not be considered wasteful, inefficient, or unnecessary, especially since fossil fuel consumption would be reduced. Moreover, under California’s Renewables Portfolio Standard, a greater share of electricity would be provided from renewable energy sources over time, so less fossil fuel consumption to generate electricity would occur.
Based on the most recent Commercial Energy Consumption Survey by the U.S. Energy Information Administration, proposed development on the project site is estimated to consume approximately 1.4 million kWh of electricity and 2.8 million cubic feet of natural gas annually (EIA 2016). The project would be required to comply with applicable provisions of the adopted California Energy Code and CALGreen in effect at the time of project approval. The provisions of these codes are intended to increase energy efficiency of buildings, thereby reducing energy consumption. Compliance with these standards would reduce energy consumption associated with project operations. Overall, project construction and operations would not consume energy resources in a manner considered wasteful, inefficient, or unnecessary. Project impacts related to energy consumption would be less than significant.
Livingston Truck Stop Complex IS/MND 3-21 December 2020 b) Consistency with Energy Plans.
The City does not have adopted plans for renewable energy or energy efficiency. However, the City has adopted the 2019 versions of both the California Energy Code and CALGreen, which contain provisions that promote energy efficiency. The project would be required to comply with the applicable requirements of these two codes, which are designed to improve energy efficiency of structure, thereby forwarding State energy conservation goals. Project impacts related to energy plans would be less than significant.
3.7 GEOLOGY AND SOILS
Would the project:
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning
Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? (Refer to Division of Mines and Geology Special Publication 42.)
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including
liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the loss of topsoil? c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property?
e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of
wastewater?
f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
v
v
v
v
v
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-22 December 2020
NARRATIVE DISCUSSION
Environmental Setting
Topography and Soils
The project site lies in the San Joaquin Valley in central California. The San Joaquin Valley is the southern portion of the Great Valley Geomorphic Province, which is a topographically flat, northwest-trending, structural trough about 50 miles wide and 450 miles long. The San Joaquin Valley is filled with thick sedimentary rock sequences that were deposited as much as 130 million years ago. Large alluvial fans have developed on each side of the Valley. The Geologic Map of the San Francisco – San Jose Quadrangle (Wagner et al. 1991) designates the underlying geology of the project site as the Modesto Formation, consisting of Quaternary (geologically recent) sediments.
According to the U.S. Department of Agriculture’s Soil Survey of Merced Area (SCS 1962, NRCS 2020), the soil on the project site is Delhi sand. This is a deep, excessively drained soil. Permeability is very rapid in this soil, which has very low water-holding capacity and produces little to no runoff. The wind erosion hazard is severe, and water erosion is evident where irrigation water has been applied too rapidly. The shrink-swell potential of this soil is low. The risk of corrosion is high for uncoated steel and low for concrete.
Seismic and Geologic Hazards
The project site is not within an Alquist-Priolo Earthquake Zones (California Geological Survey 2015). There is no record of seismic activity in the Livingston area, and no faults have been mapped (City of Livingston 1999a). However, the Livingston General Plan EIR identifies ground shaking as a potential hazard, noting the City is located between two major fault systems – the San Andreas Fault System 59 miles to the west, and the Mother Lode Fault System 42 miles to the east (City of Livingston 1999b). Additionally, the California Geological Survey notes the Ortigalita Fault, an active Holocene fault, is located 29 miles to the west.
When coarse sediments are saturated and compact during an earthquake, soils may lose strength and become fluid, a process called liquefaction. Water from voids may be forced to the ground surface, where it emerges in the form of mud spouts or sand boils. The Livingston General Plan does not identify significant liquefaction hazards in the project vicinity. As discussed in Section 3.10, Hydrology and Water Quality, groundwater levels in the Livingston area are in the range of 60-80 feet below the ground surface.
Paleontological Resources
As noted, geological materials underlying the project site include the recent (Quaternary) sedimentary deposits of the Modesto Formation. Numerous vertebrate fossil sites have been associated with the Modesto Formation in the Central Valley, including land mammals, birds, reptiles, and amphibians (California High Speed Rail Authority 2012).
The project site does not contain any known paleontological resources or unique geological features.
Livingston Truck Stop Complex IS/MND 3-23 December 2020 Environmental Impacts and Mitigation Measures
a-i) Fault Rupture Hazards.
As noted above, no active or potentially active faults have been mapped in the Livingston area. The California Geological Survey does not place the project site or the City in an Alquist-Priolo Earthquake Fault Zone (California Geological Survey 2015). The closest designated active fault is the Ortigalita fault, which is a Holocene fault approximately 29 miles west of the project site. The project would have no impact related to a fault rupture hazard.
a-ii, iii) Seismic Hazards.
As noted above, no seismic activity has been recorded in Livingston. However, the City and project site are subject to ground shaking from two fault systems. Ground shaking is a hazard to buildings and infrastructure. All new buildings in Livingston are required to be built in accordance with the most recent version of the California Building Code adopted by the City. The California Building Code includes provisions related to seismic safety, compliance with which requires buildings, based on occupancy type, to be constructed to withstand anticipated ground shaking. As a result of these requirements, project impacts related to seismic hazards are considered less than significant. a-iv) Landslides.
The topography of the project site and surrounding area is flat; therefore, landslides would not occur. The project would have no impact related to landslides. b) Soil Erosion.
Because of its sandy characteristics, Delhi soil on the project site is considered susceptible to both wind and water erosion. Compliance with SJVAPCD Regulation VIII, which is discussed in Section 3.3, Air Quality, would reduce potential wind erosion impacts.
Title 4, Chapter 6 of the Livingston Municipal Code sets forth provisions for grading of construction sites such that erosion and sedimentation are controlled. These provisions regulate and control the design, construction, quality of materials, use, location, and maintenance of grading, excavating and fill, land disturbances, land fill, and soil storage in connection with the clearing and grading of land for construction within the City. No grading or excavation is allowed without a grading permit issued by the City. An application for a grading permit must include, among other requirements, an interim and final erosion and sedimentation control plan and a geotechnical/soils investigation report if the grading operation exceeds 1,000 cubic yards. Compliance with the provisions of Livingston Municipal Code Title 4, Chapter 6 would minimize potential water erosion impacts.
In addition, for all projects that disturb one acre of land or more, a Construction General Permit is required from the SWRCB. The permit requirements include preparation of a Storm Water Pollution Prevention Plan (SWPPP) by a Qualified SWPPP Developer to address potential water quality issues. A SWPPP specifies the Best Management Practices Livingston Truck Stop Complex IS/MND 3-24 December 2020 (BMPs) needed to avoid or minimize adverse water quality impacts. Construction BMPs fall within the general categories of Temporary Soil Stabilization, Temporary Sediment Control, Wind Erosion Control, Tracking Control, Non-Storm Water Management, and Waste Management and Materials Pollution Control. BMPs applicable to the project are incorporated in the SWPPP as required. BMPs are incorporated into project improvement plans and specifications, subject to the approval of the City Engineer. BMP function and effectiveness are monitored and reported, and remediation is required to address pollution occurrence.
The project would be required to comply with the provisions of the Construction General Permit from the SWRCB, including preparation of a SWPPP, which is required by the mitigation measure below. Compliance with the mitigation measure, along with the other regulations described above, would minimize the amount of sediment that leaves the construction site and potential construction water quality effects, thereby reducing soil erosion impacts to a level that would be less than significant.
Mitigation Measures
GEO-1: Prior to commencement of construction activity, the developer shall prepare and implement a Storm Water Pollution Prevention Plan (SWPPP) for the project and file a Notice of Intent with the State Water Resources Control Board (SWRCB) in compliance with the
Construction General Permit and City of Livingston storm water requirements. The SWPPP shall be available on the construction site at all times. The developer shall incorporate an Erosion Control Plan consistent with all applicable provisions of the SWPPP within the site improvement and building plans. The developer also shall submit the SWRCB Waste Discharger’s Identification Number to the City prior to approval of development or grading plans.
c) Geologic Instability.
The City General Plan states that the City’s low elevation and mild topography negate other seismic hazards, such as settlement and liquefaction (City of Livingston 1999a). The depth to groundwater in the Livingston area ranges from 60 to 80 feet below ground surface (see Section 3.10, Hydrology and Water Quality). The soils underlying the sites where the facilities would be constructed have not been identified as inherently unstable or prone to failure. The project is not expected to change existing conditions related to geologic stability. Required engineering design of proposed structures and site improvements would avoid potential adverse effects, making potential project impacts less than significant. d) Expansive Soils.
Expansive soils are associated with soils with substantial clay content. Soils on the project site are sandy and have little to no clay content. Such soils are unlikely to be expansive.
The project would have no impact related to expansive soils.
Livingston Truck Stop Complex IS/MND 3-25 December 2020 e) Adequacy of Soils for Sewage Disposal.
The project would be connected to the City sewer system and would not use, and does not propose to install, any septic systems. The project would have no impact related to soil adequacy for sewage disposal.
f) Paleontological Resources and Unique Geological Features.
The project site is flat and contains no geological features that may be considered unique.
The project site is underlain by the Modesto Formation, which has been a source of paleontological finds. Given past agricultural activities on the project site, it is unlikely that any intact paleontological resources would be encountered. However, it is conceivable that currently unknown resources may be uncovered during project construction activities.
Procedures to address paleontological discoveries if they should occur are set forth in the mitigation measure below. Implementation of this mitigation would reduce potential impacts to a level that would be less than significant.
Mitigation Measures:
GEO-2: If any subsurface paleontological resources are encountered during construction of the project, all construction activities in the vicinity of the encounter shall be halted until a qualified paleontologist can examine these materials, make a determination of their significance and, if significant, recommend further mitigation measures that would reduce potential effects to a level that is less than significant.
Recommended measures may include, but are not limited to, 1) preservation in place, or 2) excavation, recovery, and curation by qualified professionals. The City of Livingston Community Development Department shall be notified, and the project developer shall be responsible for retaining qualified professionals, implementing recommended mitigation measures and documenting mitigation efforts in a written report to the Community Development Department, consistent with the requirements of the CEQA Guidelines.
3.8 GREENHOUSE GAS EMISSIONS
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the
environment?
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
v
v
Livingston Truck Stop Complex IS/MND 3-26 December 2020
NARRATIVE DISCUSSION
Environmental Setting
GHG Background
Greenhouse gases (GHGs) are gases that absorb and emit radiation within the thermal infrared range, trapping heat in the earth’s atmosphere. GHGs are both naturally occurring and are emitted by human activity. GHGs include carbon dioxide, the most abundant GHG, as well as methane, nitrous oxide, and other gases. GHG emissions in California in 2017, the most recent year for which data are available, were estimated at approximately 424 million metric tons carbon dioxide equivalent (CO2e) – a decrease of approximately 14% from the peak level in 2004. Transportation was the largest contributor to GHG emissions in California, accounting for approximately 40% of total emissions. Other significant sources include industrial activities, with approximately 21% of total emissions, and electric power generation, both in-state and imported, with 14.7% of total emissions (ARB 2019).
Increased atmospheric concentrations of GHGs are considered a primary contributor to global climate change, which is a subject of concern for the State of California. Potential impacts of global climate change in California include reduced Sierra Nevada snowpack, increased wildfire hazards, greater number of hot days with associated decreases in air quality, and potential decreases in agricultural production (Climate Action Team 2010).
Unlike the criteria air pollutants described in Section 3.3, Air Quality, GHGs have no “attainment” standards established by the federal or State government. In fact, GHGs are not generally thought of as traditional air pollutants because their impacts are global in nature and their health effects are indirect; air pollutants mainly affect the general region of their release to the atmosphere (SJVAPCD 2015). Nevertheless, the U.S. Environmental Protection Agency (EPA) has found that GHG emissions endanger both the public health and public welfare under Section 202(a) of the Clean Air Act due to their impacts associated with climate change (EPA 2009).
GHG Emission Reduction Plans
The State of California has implemented GHG emission reduction strategies through Assembly Bill (AB) 32, the Global Warming Solutions Act of 2006, which requires total statewide GHG emissions to reach 1990 levels by 2020, or an approximately 29% reduction from 2004 levels. In compliance with AB 32, the State adopted the Climate Change Scoping Plan in 2008 and updated the plan in 2014. Primary strategies addressed in the original Scoping Plan included new industrial and emission control technologies; alternative energy generation technologies; advanced energy conservation in lighting, heating, cooling and ventilation; fuels with reduced carbon content; hybrid and electric vehicles; and methods for improving vehicle mileage (ARB 2008). The 2014 update highlights California’s progress toward meeting the 2020 GHG emission reduction goal of the original Scoping Plan, and it establishes a broad framework for continued emission reductions beyond 2020, on the path to 80% below 1990 levels by 2050 (ARB 2014). The Livingston Truck Stop Complex IS/MND 3-27 December 2020 2017 state GHG emissions were approximately seven million metric tons CO2e below the 2020 target established by AB 32 (ARB 2019).
In 2016, Senate Bill (SB) 32 was enacted. SB 32 extends the GHG reduction objectives of AB 32 by mandating statewide reductions in GHG emissions to levels that are 40% below 1990 levels by the year 2030. The State has adopted an updated Scoping Plan that sets forth strategies for achieving the SB 32 target. The updated Scoping Plan continues many of the programs that were part of the previous Scoping Plans, including the cap-and-trade program, low-carbon fuel standards, renewable energy, and methane reduction strategies.
It also addresses, for the first time, GHG emissions from the natural and working lands of California, including the agriculture and forestry sectors (ARB 2017).
The SJVAPCD adopted a Climate Change Action Plan in 2008 and issued guidance for development project compliance with the plan in 2009. The guidance adopted an approach that relies on the use of Best Performance Standards to reduce GHG emissions. Projects implementing Best Performance Standards would be determined to have a less than cumulatively significant impact. For projects not implementing Best Performance Standards, demonstration of a 29% reduction in project-specific (i.e., operational) GHG emissions from business-as-usual conditions is required to determine that a project would have a less than cumulatively significant impact (SJVAPCD 2009).
Cities and counties throughout California have prepared Climate Action Plans that outline how the local government will reduce GHG emissions, which are typically related to the 2020 emission reduction target set in the State’s Climate Change Scoping Plan. The City currently has no Climate Action Plan or other GHG reduction plan.
Environmental Impacts and Mitigation Measures
a, b) Project GHG Emissions and Consistency with GHG Reduction Plans.
The CalEEMod model estimated the total GHG construction and operational emissions associated with the project (see Appendix A). Table 3-4 presents the results of the CalEEMod run. GHG construction emissions would be limited due to the length of time of construction activity; these emissions would cease once work is completed.
TABLE 3-4
ESTIMATED GHG EMISSIONS FROM PROJECT
GHG Emission Type
Unmitigated
Emissions
Mitigated
Emissions
Construction1 68.9 68.9
Operational2 6,484.0 5,502.0
1 Total GHG emissions for construction period in tons carbon dioxide equivalent (CO2e). 2 Annual emissions in tons CO2e.
Sources: California Emissions Estimator Model v. 2013.2.2.
Livingston Truck Stop Complex IS/MND 3-28 December 2020 “Mitigated emissions” are the result of project compliance with applicable laws, rules and regulations, along with inclusion of project features that reduce GHG emissions. These include the following:
• Increase in the diversity of land uses.
• The project site is approximately 0.75 miles from downtown Livingston. • The project would add sidewalk to the site.
• SB X7-7 in 2009 sets an overall goal of reducing per capita urban water use by 20% by December 31, 2020. The California Green Building Code mandates a 20% reduction in indoor water use.
• AB 341 establishes the goal of diverting 75% of California’s waste stream from landfills by 2020.
Mitigated operational GHG emissions would be approximately 15% less than under business-as-usual (unmitigated) conditions. This would be less than the 29% GHG reduction target of the SJVAPCD Climate Change Action Plan.
However, the Climate Change Action Plan is intended to be consistent with the State’s Climate Change Scoping Plan reduction targets, Approximately 83% of the GHG emission reduction programs in the Scoping Plan counted toward meeting the 29% objective for 2020 are State-level programs, with the remaining 17% to be achieved by programs at the local government level, including development review. Thus, the local action share of the 29% reduction would be 4.93%. Based on this, it can be assumed that a development project that achieves at least a 4.93% reduction in GHG emissions from business-as-usual levels would be consistent with the objectives of both State and SJVAPCD GHG reduction plans.
The 15% reduction associated with the project would exceed this local share. Therefore, project operational GHG emissions would be consistent with the Scoping Plan, along with the objectives of the Climate Change Action Plan. Project impacts related to GHG emissions and GHG reduction plans are considered less than significant.
3.9 HAZARDS AND HAZARDOUS MATERIALS
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Create a significant hazard to the public or the
environment through the routine transport, use, or disposal of hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset and
v
v
Livingston Truck Stop Complex IS/MND 3-29 December 2020 accident conditions involving the release of hazardous
materials into the environment?
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
NARRATIVE DISCUSSION
Environmental Setting
This section focuses on hazards associated with hazardous materials, proximity to airports, and wildfires. Geologic and soil hazards are addressed in Section 3.7, Geology and Soils; potential flooding hazards are addressed in Section 3.10, Hydrology and Water Quality.
Data on recorded hazardous material sites are kept in the GeoTracker database, maintained by the State Water Resources Control Board (SWRCB), and in the EnviroStor database, maintained by the California Department of Toxic Substances Control (DTSC). Both GeoTracker and EnviroStor provide the names and addresses of documented hazardous material sites, along with their cleanup status. A search of both GeoTracker and EnviroStor indicated no record of active hazardous material sites (i.e., sites not cleaned up) within onehalf mile of the Hammatt Avenue/Campbell Boulevard intersection (SWRCB 2020, DTSC 2020).
There are no airports in the Livingston area. The nearest airport to the project site is Turlock Municipal Airport in Turlock in Stanislaus County, approximately eight miles to the northwest. Castle Airport in Atwater is approximately nine miles to the east.
The Livingston General Plan states that wildland fire hazards threaten life and property within the Livingston vicinity. Wildland fires are an annual hazard in Merced County.
Wildland fires burn natural vegetation on undeveloped lands and include rangeland, brush, and grass fires. Long, hot, and dry summers with temperatures often exceeding 100°F add v
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-30 December 2020 to the County’s fire hazard. Human activities are the major causes of wildland fires, while lightning causes the remaining wildland fires. The only wildfire hazard areas identified in the vicinity are scattered areas of Moderate hazard located east of the City (Merced County 2012).
Hazardous Materials
The regulation of hazardous materials at the federal level primarily is under the Resource Conservation and Recovery Act, which creates a framework for the transport, storage, and disposal of hazardous wastes. The U.S. Department of Transportation sets regulations for the transport of hazardous materials, such as gasoline and diesel fuels. Several state agencies regulate the transportation and use of hazardous materials, including the California Environmental Protection Agency (CalEPA) and the Office of Emergency Services. The California Highway Patrol and California Department of Transportation (Caltrans) enforce regulations specifically related to hazardous materials transport. Within CalEPA, the DTSC has primary authority to enforce hazardous materials regulations.
On the local level, the Merced County Health Department, Division of Environmental Health, has been approved by the State as a Certified Unified Program Agency (CUPA). A CUPA administers the Hazardous Material Business Plan, California Accidental Release Prevention, Aboveground Petroleum Storage Act, Hazardous Waste Generator, and Hazardous Waste Onsite Treatment programs, and formerly the Underground Storage Tank (UST) program. Three of these programs are applicable to the project:
• A Hazardous Material Business Plan is required for all activities that handle hazardous materials in quantities equal to or greater than 55 gallons of a liquid. The requirements of the plan include an inventory of hazardous materials, an emergency plan addressing the release of hazardous materials, and a training program for employees.
• The Aboveground Storage Tank program requires any facility with an aggregate storage capacity of 1,320 gallons of petroleum or greater to prepare and implement a Spill Prevention, Control, and Countermeasure Plan in accordance with federal law. The purpose of the Spill Prevention, Control, and Countermeasure Plan is to help facilities prevent oil spills, as well as control a spill should one occur. • The UST program is intended to protect public health and the environment from exposure to hazardous materials stored in underground storage tanks. Program activities include inspection, permitting, monitoring, repair, installation, and removal of tanks. In 2013, the Merced County Health Department relinquished oversight of USTs to the Central Valley Regional Water Quality Control Board (RWQCB).
Livingston Truck Stop Complex IS/MND 3-31 December 2020 Environmental Impacts and Mitigation Measures
a, b) Hazardous Material Transport, Use, and Potential Release.
The project involves a fueling station, which would require the transport and storage of gasoline and diesel fuels. Both fuels are flammable, and gasoline contains toxic substances such as benzene. The fuels would be stored in underground tanks, the installation of which would be subject to the UST program. The project also would be required to submit a Hazardous Material Business Plan that addresses the on-site use and storage of fuels.
The main risk of hazardous material release would be from the transportation of fuels to the project site by tanker trucks. Fuels could be released by trucks involved in an accident or that overturn. As noted above, the transport of hazardous materials is subject to state and federal regulations designed to minimize the risk of release of hazardous materials into the environment. While the City does not have regulations to minimize the risk of release of hazardous materials, the City and Merced County have emergency response teams that would handle any incident involving hazardous materials. The project is accessible from SR 99 freeway and urban streets; the project would not result in a significant increase in hazards related to hazardous material transportation.
A potential release could also occur with spills at the aboveground fuel storage tanks on the project site. The project would be required to prepare and implement a Spill Prevention, Control, and Countermeasure Plan, which would reduce the likelihood of spills and control spills should they occur.
Other commercial development on the project site would store, sell, and use small amounts of hazardous materials. These materials are not expected to be in quantities large enough to pose a threat to human health and the environment if released and would be stored and contained in accordance with applicable federal and state regulations. Project impacts related to hazardous materials handling are considered less than significant. c) Hazardous Materials Releases near Schools.
There are no schools within one-quarter mile of the project site. The nearest school is Campus Park Elementary, approximately one-half mile to the southwest. As noted above, hazardous materials to be stored, sold, or used on the project site would be subject to applicable federal and state transport and storage regulations. The project would have no impact on hazardous material releases near schools.
d) Hazardous Materials Sites.
As noted, a search of the GeoTracker and EnviroStor databases did not identify any active hazardous material sites in the vicinity of the project site. A list of solid waste disposal sites identified by SWRCB with waste constituents above hazardous waste levels outside the waste management unit did not show any locations at the project site or vicinity (CalEPA 2016a). Likewise, a list by SWRCB containing sites under Cease and Desist Orders and Cleanup and Abatement Orders showed no locations (CalEPA 2016b). The project would have no impact related to hazardous material sites.
Livingston Truck Stop Complex IS/MND 3-32 December 2020 e) Public Airport Operations.
As previously discussed, there are no public airports in Livingston or in the vicinity. The project would have no impact related to potential hazards from airport operations. f) Emergency Response and Evacuations.
Project construction work would mostly occur on the project site, with work on adjacent roads limited to connection to utility lines. Such work is not expected to require closure of the roads, so neither project construction nor operation is expected to obstruct emergency vehicle operations or evacuations that may occur in the area. Project impacts on emergency response or emergency evacuation plans would be less than significant. g) Wildland Fire Hazards.
The project site is not in a region susceptible to wildfires. Land in the vicinity of the project site is either agricultural or developed, and neither such land has a high wildfire potential.
The project would reduce the existing fire hazard on the parcel by replacing the existing grasses and weeds with development and pavement. Project impacts related to wildfires would be less than significant. See Section 3.20, Wildfire, for a more detailed discussion of potential hazards.
3.10 HYDROLOGY AND WATER QUALITY
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the
basin?
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river runoff or through the addition of impervious surfaces, in a manner which would:
i) Result in substantial erosion or siltation on- or off-site? ii) Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site?
iii) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage v
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-33 December 2020 systems or provide substantial additional sources of
polluted runoff?
iv) Impede or redirect flood flows?
d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
e) Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater management plan?
NARRATIVE DISCUSSION
Environmental Setting
Surface Waters
There are no streams or other surface waters on or adjacent to the project site. The nearest surface waters of any kind are the Curtner Lateral and Wakefield Lateral, which are irrigation canals that are more than one-half mile north and south of the project site, respectively.
Surface water quality in the Livingston area is maintained through the City’s Storm Water Management Program (SWMP), developed in compliance with the federal National Pollutant Discharge Elimination System (NPDES) program and with the SWRCB’s Municipal Separate Storm Sewer Systems (MS4) General Permit. The program includes control measures and defines BMPs designed to protect surface water quality associated with land development during both construction and post-construction periods (City of Livingston 2007).
Post-construction elements of the SWMP are governed by City ordinances that require compliance with the City’s adopted SWMP, as permitted by the Central Valley RWQCB Order No. 2003-0005-DWQ. The SWMP identifies a range of post-construction BMPs that must be incorporated into development plans. BMPs may include, but are not limited to, vegetated buffer strips and swales, detention basins, vaults and wetlands, and various filtration and infiltration and structures devices, among others. Under new NPDES requirements applicable to the City, storm water discharge volumes associated with new development cannot exceed existing discharges. Volume control can be achieved through a combination of low-impact development and specific measures.
Groundwater
The project site is within the Merced Groundwater Subbasin, which underlies 767 square miles of central and eastern Merced County. The Merced Subbasin consists of five aquifer systems and has an estimated storage capacity of 45.3 million acre-feet. The storage capacity declined approximately 1.92 million acre-feet from 2006 to 2015. From the 1996 to the 2015 water years, average inflow per water year to the Subbasin has been 643,000 acre-feet, and average outflow has been 752,000 acre-feet (Merced SGMA 2019). v
v
v
Livingston Truck Stop Complex IS/MND 3-34 December 2020 The City relies on groundwater for its water supply, which is provided by eight wells (see Section 3.19, Utilities and Service Systems). In the Livingston area, the depth to the groundwater table ranges from 60 to 80 feet below ground surface (DWR 2004).
Groundwater quality in the Livingston area is generally good; however, the City has been given notices regarding water samples that contain unacceptable levels of coliform bacteria, arsenic, and 1,2,3-trichloropropane (City of Livingston 2018a). The City has recently implemented projects designed to correct identified water quality deficiencies (City of Livingston 2018b).
In 2014, the State enacted the Sustainable Groundwater Management Act. This act requires the formation of local groundwater sustainability agencies that must assess conditions in their local water basins and adopt locally based Groundwater Sustainability Plans for sustainable use of groundwater and avoidance of overdraft. Plans for “critically overdrafted” basins must be completed and adopted by January 31, 2020, while plans for high- and medium-priority basins have an adoption deadline of January 31, 2022. The Merced Irrigation-Urban Groundwater Sustainability Agency, of which the City is a member, was formed in 2017. A Groundwater Sustainability Plan for the Merced Subbasin, classified as critically overdrafted, was adopted on January 28, 2020 (Merced SGMA 2019).
Flooding Hazard
A Flood Insurance Rate Map prepared by the Federal Emergency Management Agency (FEMA) indicates that the project site is designated Zone X. Zone X is considered an area of minimal flood hazard. It is outside a delineated 100-year floodplain – the floodplain commonly used to assess potential flooding impacts and considered a Special Flood Hazard Area (FEMA 2008). The project site is within the potential dam failure inundation area for the New Exchequer Dam, which forms the Lake McClure reservoir (Merced County 2013).
In 2007, the State of California approved SB 5 and a series of related Senate and Assembly bills intended to set new flood protection standards for urban areas in the Central Valley.
These bills, referred to collectively in this document as “SB 5,” establish the State standard for flood protection as the 200-year frequency flood. Under SB 5, urban and urbanizing areas must be provided with 200-year flood protection no later than 2025. Preliminary maps drafted by the California Department of Water Resources indicate the project site is outside the 200-year floodplain.
Environmental Impacts and Mitigation Measures
a) Surface Waters and Water Quality.
The project would not directly affect surface waters, as none are in the project vicinity. As noted in Section 3.7, Geology and Soils, construction activities would disturb soils, which could be transported off site by runoff and could eventually enter surface waters. Project development and operation would lead to contamination of storm runoff with fuels, oils, metals, and other substances associated with motor vehicles and trucks. These discharges could eventually enter surface waters. This is considered a potentially significant impact.
Livingston Truck Stop Complex IS/MND 3-35 December 2020 As noted, the City of Livingston has adopted a SWMP, which is intended to minimize the potential storm water quality impacts of development. Program elements most applicable to land development include construction storm water discharge requirements, industrial discharge requirements and the incorporation of post-construction BMPs. Storm water from areas of new development must be treated using the post-construction BMPs specified in the SWPPP. These measures will be specified during the design phase of the project.
Developers are required to enter into an agreement for maintenance of the postconstruction BMPs.
Compliance with the provisions of the City’s SWMP, which are specified in the mitigation measures below, would reduce impacts to a level that would be less than significant. In addition, implementation of Mitigation Measure GEO-1, described in Section 3.7, Geology and Soils, would minimize water quality impacts from construction activities, along with compliance with SJVAPCD Regulation VIII.
Mitigation Measures
HYDRO-1: The developer shall submit a Storm Water Quality Plan for the project that shall include post-construction Best Management Practices (BMPs) as required by the City’s Storm Water
Management Program. The Storm Water Quality Plan shall be reviewed and approved by the City of Livingston Public Works Department prior to approval of project improvement plans.
HYDRO-2: If required, the developer shall execute a Maintenance Agreement with the City for stormwater BMPs prior to receiving a Certificate of Occupancy. The developer shall remain the responsible party and provide funding for the operation, maintenance and replacement costs of the proposed treatment devices built for the project.
HYDRO-3: The developer shall comply with applicable requirements of, and pay all associated fees as required by, the City’s Storm Water Pollution Prevention Program as set forth in its NPDES Storm Water Permit.
b) Groundwater Supplies and Recharge.
The City relies on groundwater for its primary source of water. The project would not draw directly from the underlying groundwater but would be connected to the City’s water system. Project demand would indirectly affect groundwater supplies, but adequate water supply exists to accommodate this demand (see Section 3.19, Utilities and Service Systems).
The project would replace an existing vacant parcel of grasses and weeds with urban development, including pavement. This would substantially reduce the amount of precipitation that would percolate into the ground at this site, thereby reducing the sites contribution to groundwater recharge. Given the relatively small acreage of the project site and the extent of other lands available for recharge in and surrounding the City, the project is not expected to interfere substantially with groundwater recharge such that there would Livingston Truck Stop Complex IS/MND 3-36 December 2020 be a net deficit in aquifer volume or a lowering of the local groundwater table level. The Merced Integrated Regional Water Management Plan indicates an abundance of available land suitable for groundwater recharge in the Livingston vicinity (RMC Water and Environment 2013). Project impacts on groundwater are considered less than significant. c-i, ii) Drainage Patterns.
The project would alter existing storm drainage patterns, due to site grading and the installation of pavement. However, as described in c-iii) below, runoff from the project site would be collected and discharged to an on-site drainage system or to the City’s drainage system. Therefore, the altered drainage patterns would not lead to increased erosion or siltation, nor would it generate on-site or off-site flooding. Project impacts related to drainage patterns would be less than significant.
c-iii) Runoff.
Proposed improvements on the project site would result in the generation of additional runoff due to the introduction of impervious surfaces. An on-site drainage system would collect all runoff generated on the project site and either deliver it to the City’s drainage system or to an on-site detention basin. The on-site detention basin would be designed and installed in accordance with City standards and specifications. The City storm drainage system is expected to have capacity to accommodate project runoff it receives. Project impacts related to runoff are considered less than significant. c-iv) Flood Flows.
As noted, the project site is not within a 100-year floodplain as indicated by the FEMA map for the area, nor is it within a 200-year floodplain. The project would have no impact related to flood flows.
d) Other Flooding Hazards.
As noted, the project site is not within a floodplain. The site is within the potential inundation zone of New Exchequer Dam were it to fail. However, the Merced County General Plan states that the probability of failure of the dam as being low (Merced County 2013). The project site is in a topographically flat region away from the coast, with no large bodies of water in the vicinity. Therefore, the project would not be affected by seiche or tsunamis. Project impacts related to release of pollutants due to project site inundation are considered less than significant.
e) Water Quality and Groundwater Sustainability Plans.
As described above, the project would be required to comply with the provisions of the City’s SWMP, which is designed to maintain local water quality. The Groundwater Sustainability Plan for the Merced Subbasin has been adopted. It is expected that the project would comply with any applicable provisions of this plan. The project would have no impact related to water quality or groundwater plans.
Livingston Truck Stop Complex IS/MND 3-37 December 2020
3.11 LAND USE AND PLANNING
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Physically divide an established community?
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
NARRATIVE DISCUSSION
Environmental Setting
The project site is a flat, undeveloped area previously used in the past for agricultural activities. The site is currently vacant. As noted in Chapter 2.0, Project Description, the current City General Plan designation for the project site is Highway Commercial, Service Commercial. The current zoning is C-3, Highway Service Commercial. Adjacent lands are similarly designated for commercial and industrial development, except for land adjacent to and west of the project site that has an existing detention basin This land is designated by the City General Plan as Public Facility and is zoned PF, Public/Quasi Public Facilities.
The project vicinity generally consists of a mix of vacant and developed land. The site is bordered on the south by the SR 99 freeway, and on the north by Campbell Boulevard.
Adjacent lands are vacant. Northwest of the project site is a single-family residential development. North of the project site the vacant land is currently in limited agricultural use. Northeast of the project site is a light industrial development with a mix of businesses.
Low-income residents, communities of color, tribal nations, and immigrant communities have historically experienced disproportionate environmental burdens and related health problems. The California Office of Environmental Health Hazard Assessment has developed the California Communities Environmental Health Screening Tool (CalEnviroScreen) to identify “environmental justice” or “disadvantaged” communities.
CalEnviroScreen measures pollution and population characteristics of each U.S. Census tract in California using 20 indicators such as air and drinking water quality, waste sites, toxic emissions, asthma rates, and poverty. These indicators are used to generate a score that rates the level of cumulative environmental impacts on each tract. A census tract with a higher score is one that experiences higher pollution burdens and vulnerability than one with a lower score.
The project site is within a Census tract that includes the City of Livingston north of SR 99, the community of Snelling, and the adjacent rural areas. This Census tract has a score in the 80-85% percentile, which makes it a “disadvantaged community” as defined by SB v
v
Livingston Truck Stop Complex IS/MND 3-38 December 2020 535. The tract, the population of which is 71% Hispanic, had high indicator scores related to air pollution, pesticides, and drinking water (OEHHA 2020).
Environmental Impacts and Mitigation Measures
a) Division of Established Communities.
The project site is a vacant parcel in an area that contains mostly vacant parcels. The project site is adjacent to SR 99 and has been designated along with other properties in the area for highway commercial and industrial use. The project is consistent with these designations and therefore is a part of the future community of Livingston as defined in the Livingston General Plan. There are no residences or residential communities in the immediate vicinity.
The project would have no impact related to division of established communities. b) Conflicts with Plans, Policies and Regulations Mitigating Environmental Effects.
Project development would be consistent with existing zoning and General Plan designations. The City General Plan was prepared to balance City growth and development with environmental protection to the extent practical. The zoning ordinance is required to be consistent with the General Plan.
Potential environmental impacts of the project are described in this IS/MND, along with plans and ordinances applicable to the environmental issue analyzed. In no cases would the project result in an environmental impact that would be potentially significant.
Although not discussed in the City’s General Plan or other plans, adopted environmental impacts on disadvantaged communities is an issue of concern to the State of California. As noted, the project site is within a Census tract classified as a disadvantaged community by CalEnviroScreen. There are residential subdivisions within one-half mile of the project site that could potentially be affected by the project.
The project may contribute air pollutant emissions, including diesel particulate matter, that could have a negative impact (see Section 3.3, Air Quality). However, as discussed in Section 3.3, project operational emissions would not exceed the SJVAPCD significance thresholds for criteria pollutants except for NOx, which would be reduced below its significance threshold with the required application of SJVAPCD Rule 9510. The SJVAPCD significance thresholds were designed to ensure that SJVAPCD would meet its adopted air quality plans, which were designed in part to meet federal air quality standards set for human health. SJVAPCD Rules 4621 and 4622 would limit emissions from fuel dispensing stations in order to protect human health. The nearest sensitive receptors to air toxic emissions are approximately 1,200 feet away; diesel particulate matter emitted by the project would likely dissipate before reaching these receptors.
Also, as discussed in Section 3.10, Hydrology and Water Quality, the project would have no impact on groundwater, which is the main source for drinking water of the population in the Census tract that is not within the Livingston city limits. As the project does not propose agricultural uses, it would not contribute to existing conditions in the tract related to pesticide use.
Livingston Truck Stop Complex IS/MND 3-39 December 2020 The project is not expected to conflict with any City plans and ordinances containing provisions designed to avoid or minimize environmental effects. Project impacts would be less than significant.
3.12 MINERAL RESOURCES
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the
residents of the state?
b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan?
NARRATIVE DISCUSSION
Environmental Setting
No significant mineral resources have been identified in the City of Livingston, and there are no mineral operations in Livingston (City of Livingston 1999b). There are no active oil or natural gas fields in the project vicinity (DOGGR 2001).
Environmental Impacts and Mitigation Measures
a, b) Availability of Mineral Resources.
There are no identified mineral resources deposits in the Livingston area. The project would have no effect on the availability of, or access to, locally designated or known mineral resources. The project would have no impact on mineral resources.
3.13 NOISE
Would the project result in: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? b) Generation of excessive groundborne vibration or
groundborne noise levels?
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-40 December 2020 c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
NARRATIVE DISCUSSION
Environmental Setting
Noise Background
Noise is commonly measured by using the decibel (dB) scale. Within the usual range of environmental noise levels, perception of loudness is relatively predictable, and can be approximated by the A-weighting network. There is a strong correlation between Aweighted sound levels (expressed as dBA) and the way the human ear perceives noise.
Community noise is commonly described in terms of the "ambient" noise level, which is defined as the all-encompassing noise level associated with a given noise environment. A common statistical tool to measure the ambient noise level is the average, or equivalent, sound level (Leq), which corresponds to a steady-state, A-weighted sound level containing the same total energy as a time-varying signal over a given time period (usually one hour).
The Leq shows very good correlation with community response to noise, and it is the basis for other noise descriptors such as Ldn and CNEL. Ldn (day-night average level) is based upon the average hourly Leq over a 24-hour day, with a +10 dB weighting applied to noise during the hours between 10:00 p.m. and 7:00 a.m. to account for greater sensitivity during that period. The CNEL (community noise equivalent level) is similar to the Ldn, with an additional +5 dB weighting applied to noise during the hours between 7:00 p.m. and 10:00 p.m.
The project site and vicinity are currently a mix of agricultural, residential, and commercial uses, along with vacant land. The existing ambient noise environment in the project site is defined primarily by traffic on local surface roadways and on SR 99. The project site falls within the 60 dB Ldn noise contour for SR 99 (City of Livingston 1999a). Surface streets in the project site are lightly traveled and do not contribute substantially to the local effects of SR 99 traffic. Campbell Boulevard west and east of Hammatt Avenue currently generates Ldn noise levels ranging between 58 and 62 dB at 100 feet from the roadway centerline.
The Noise Element of the Livingston General Plan establishes noise standards applicable to new development projects. Residential dwellings shall not be exposed to noise from transportation sources at levels that exceed 65 dB Ldn/CNEL in outdoor activity areas of these facilities. Interior noise levels within these facilities shall not exceed 45 dB Ldn/CNEL. Conversely, and although not expressly stated in the general plan, new land uses that generate substantial transportation noise should not cause existing or planned residential areas to exceed outdoor noise standards.
v
Livingston Truck Stop Complex IS/MND 3-41 December 2020 The Noise Element also establishes acceptable noise level limits for stationary noise sources applicable at the property line of noise-sensitive land uses, such as residences.
Table 3-5 shows the City noise standards.
TABLE 3-5
CITY OF LIVINGSTON MAXIMUM STATIONARY-SOURCE NOISE EXPOSURE Noise Level Descriptor
Outdoor Activity Areas
Day
(7:00 a.m. to 10:00 p.m.)
Night
(10:00 p.m. to 7:00 a.m.)
Hourly Leq, dB 55 50
Maximum level (Lmax), dB 75 70
Source: City of Livingston 1999a.
Environmental Impacts and Mitigation Measures
a) Exposure to Noise Exceeding Local Standards.
Project construction would involve temporary increases in ambient noise levels, due to the use of construction equipment and construction vehicle traffic to and from the project site.
Noise associated with construction equipment use can range up to approximately 90 dB at 50 feet. Construction noise involves a potentially significant impact where it occurs in the vicinity of sensitive receptors.
The project site is approximately 1,200 feet from the nearest sensitive receptor, which is existing residential development to the northeast. The distance between the project site and nearby residences would result in maximum noise level reductions of more than 24 dB, reducing maximum construction noise levels to below 70 dB, the City’s maximum nighttime noise level standard. The City of Livingston 1999 General Plan prohibits the operation of construction equipment on private property such that the sound creates a noise disturbance across a residential property line during the hours of 10:00 p.m. to 7:00 a.m., limiting the time any noise generated by construction activities would reach residences. In addition, construction noise would cease once construction work is completed.
Construction noise impacts would be less than significant.
The proposed commercial development is not a noise-sensitive land use, and therefore project exposure to noise generated by existing and future traffic on SR 99 or on surrounding local streets would not be of concern. The developed project site would have the characteristics of a stationary noise source and a source of off-site traffic noise that could affect surrounding land uses. The project would be located adjacent to Hammatt Avenue and the SR 99 northbound ramps, which are not noise sensitive, and there are no existing or planned sensitive noise receptors in the immediate project vicinity. As noted, the closest sensitive noise receptor is approximately 1,200 feet northeast of the project site.
Livingston Truck Stop Complex IS/MND 3-42 December 2020 The project would generate substantial additional truck and other vehicular traffic along Hammatt Avenue and Campbell Boulevard between the SR 99 ramps and the project access ways. Traffic increases on Campbell Boulevard would be concentrated in the section south of Hammatt Avenue. Potential increases in noise generated by project traffic were modeled using the Federal Highway Administration’s Highway Traffic Noise Prediction Model (FHWA-RD-77-108). Under both existing and cumulative conditions, project-related traffic would not result in significant increases in either existing or future traffic noise.
South of Hammatt Avenue, the project-generated traffic would result in significant noise increases under existing plus project (11.9 dB) and future cumulative (10.7 dB) scenarios in the immediate vicinity of Campbell Boulevard, largely as a result of increases in truck traffic. Increased traffic would increase traffic noise levels from existing levels in the range of 61-64 dB Ldn to with-project levels just exceeding 70 dB within 100 feet of the roadway.
However, lands within 800 feet of Campbell Boulevard are in, or planned for, commercial use that are not noise-sensitive, so noise increases associated with the project would not result in a significant noise effect. In more distant areas developed or planned for development in residential uses, noise levels with the project would not exceed 61.3 dB Ldn, which is well below the City’s transportation noise standard for residential uses.
Project impacts on noise-sensitive land uses would be less than significant. b) Exposure to Groundborne Noise.
Groundborne vibration is not a common environmental problem. It is typically associated with transportation facilities, although it is unusual for vibration from sources such as buses and trucks to be perceptible, even in locations close to major roads. Some common sources of groundborne vibration are trains, buses on rough roads, and construction activities such as blasting, pile driving, and operating heavy earth-moving equipment.
The project site is approximately 100 feet from the nearest SR 99 through lane; however, the project would not be sensitive to potential vibration impact. Truck traffic associated with the project would largely travel to and from SR 99. This traffic would be on roads constructed to the City commercial standards and designed to accommodate truck traffic, thereby minimizing potential vibrations. It is anticipated that the project would not be exposed to groundborne vibrations nor would it generate substantial groundborne vibrations. As noted, there are no sensitive land uses in the immediate vicinity of the project site, so no such uses would be affected by vibrations. Groundborne vibration impacts would be less than significant.
c) Public Airport and Private Airstrip Noise.
As noted in Section 3.9, Hazards and Hazardous Materials, there are no public airports or private airstrips in the project vicinity. The project would not be exposed to or have any impact related to noise from airports and airstrips.
Livingston Truck Stop Complex IS/MND 3-43 December 2020
3.14 POPULATION AND HOUSING
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
b) Displace substantial numbers of existing people or
housing, necessitating the construction of replacement
housing elsewhere?
NARRATIVE DISCUSSION
Environmental Setting
As of January 1, 2020, the population of Livingston was estimated at 15,052, an increase from its 2010 population of 13,508. The number of housing units in Livingston on the same date was 3,690 – an increase from 3,220 in 2010. Of the total housing units in 2020, 3,113 were single-family detached units (typical houses), approximately 84.3% of the total.
Approximately 8.5% of the total housing units were multifamily units of five or more per building. The total number of such units was 312, an increase from 263 in 2010 (California Department of Finance 2020).
Environmental Impacts and Mitigation Measures
a) Population Growth Inducement.
The project would involve commercial development on the 18.9-acre site. While the commercial development would provide new employment opportunities in Livingston, these opportunities would be limited in number and can be expected to be met from the existing population in the Livingston area.
The project would primarily serve SR 99 travelers; the project is not expected to result in any substantial attraction to other new development. As a result, the proposed project is not expected to induce population growth, directly or indirectly, in or near Livingston.
The project site would be served by existing or planned City infrastructure in the vicinity.
No substantial extension of new infrastructure that could serve or induce other development would occur in conjunction with or as a result of the project. Overall, project impacts on population growth are considered less than significant. v
v
Livingston Truck Stop Complex IS/MND 3-44 December 2020 b) Displacement of Housing or People.
The project site is vacant. There are no existing residences on or in the vicinity of the project site. Therefore, the project would not displace housing or people. The project would have no impact on this issue.
3.15 PUBLIC SERVICES
Would the project:
a) Result in substantial adverse physical impacts associated with the provision of, or the need for, new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
i) Fire protection?
ii) Police protection?
iii) Schools?
iv) Parks?
v) Other public facilities?
NARRATIVE DISCUSSION
Environmental Setting
Fire Protection
Fire protection, rescue, and emergency medical response service are provided to the citizens of the City of Livingston by the Livingston Fire Department. Livingston Fire Department is managed through a contractual agreement with Merced County. The agreement consists of staffing for one Cal Fire full time position 24 hours a day, 7 days a week, and 15 volunteer members in the City (Merced County LAFCo 2018). The County Fire Department maintains Station 96 on 1430 C Street in downtown Livingston, which has one Type 2 fire engine, and one Type 1 water tender (Merced County Fire Department 2019). In 2016, Livingston maintained a ratio of slightly greater than one volunteer per 1,000 residents (Merced County LAFCo 2018).
Over the last few years, emergency calls have been steadily increasing. In 2016, the Fire Department responded to 1,581 calls for services. In 2015, the Fire Department responded to 1,468 calls for services. In 2014, the Fire Department responded to 1,214 calls for services. Emergency calls in 2016 rose approximately 10 percent and are projected to grow in the upcoming years. Medical emergencies make up approximately 54 percent of the call v
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-45 December 2020 volume. To accommodate new growth or annexations, the City has concluded that construction of additional fire stations may be required (Merced County LAFCo 2018).
Police Protection
Police protection services are provided by the Livingston Police Department. It is the largest General Fund department in the City, about 57 percent of the FY 2016/17 General Fund expenditure budget. The Police Department employed 20 full-time sworn and professional staff personnel as of February 2018, with one additional position anticipated to be filled. In 2005, the City adopted a policy to maintain a ratio of 1.5 officers per 1,000 residents (Merced County LAFCo 2018).
In 2012, the City of Livingston entered into an agreement to provide dispatch services to the City of Gustine. The service required City staff to answer 9-1-1 calls and business lines after hours. In addition to providing services to the City of Gustine, over the last decade there have been two developments in the south portion of the City and other recent commercial developments that have impacted the need for services (Merced County LAFCo 2018).
The Police Department operates from its station at 1446 C Street. The City has not updated or expanded the police facility, but there is a plan to add a second story to the facility. The funding source would need to be identified. While the City has identified department needs for the next six years, there is no updated master plan or adopted capital improvement plan (Merced County LAFCo 2018).
Schools
Elementary and middle school services (kindergarten to 8th grade) are provided by the Livingston Union School District (LUSD). As of the 2018-19 school year, total enrollment in the LUSD was 2,464 students (EdData 2020). Livingston Middle School, the only middle school in the LUSD, is located at 101 F Street approximately 1.2 miles northwest of the project site. The school had an enrollment of 830 students as of the 2018-19 school year. The closest LUSD elementary school is Campus Park Elementary School, located at 1845 H Street approximately 0.5 miles northeast from the site. Enrollment at this school during the 2018-19 school year was 454 students (EdData 2020).
High school services are provided by the Merced Union High School District (MUHSD).
Livingston High School, part of the MUHSD and the only public high school in the City, is located on 1617 Main Street, south of the project site. During the 2018-19 school year, enrollment at Livingston High School was 1,243 students (EdData 2020).
Other Public Services
The Livingston Recreation Department manages parks and recreation programs in the City.
Section 3.16, Recreation, discusses parks and recreational facilities in more detail. Other public facilities include the Livingston branch of the Merced County Library, located on 1212 Main Street.
Livingston Truck Stop Complex IS/MND 3-46 December 2020 Environmental Impacts and Mitigation Measures
a) Fire Protection.
As noted, to accommodate new growth or annexations, the City has identified a possible need for the construction of additional fire stations. Station 96 is in a developed area with existing utility infrastructure. Because of the existing development, available area for expansion may be limited and may require removal of structures and/or pavement, which may involve potential environmental impacts. Another option would be the construction of a new fire station at another site. The City is in the process of identifying a location for a new fire station (Merced County LAFCo 2018). Both options would be subject to CEQA review for potential environmental impacts, if required. Neither option would necessarily be triggered by proposed project development, but the project would place additional demands on fire protection service.
Buildings constructed as part of the project would be required to comply with the provisions of the 2019 California Fire Code, recently adopted by the City. The Fire Code contain provisions designed to improve fire safety in structures, including installation of sprinkler systems, alarm systems, and portable fire extinguishers, along with requirements for hydrants and fire flows. The City has adopted additional provisions related to fire safety in its Fire Prevention Code (Livingston Municipal Code Title 7, Chapter 2). Compliance with these requirements would minimize the risk of fires occurring in new development proposed by the project.
The project also would be subject to the City’s adopted Building and Electrical Codes with their applicable provisions related to fire safety, including the installation of smoke detectors and sprinkler systems. Entryways would be constructed to City standards, which consider emergency vehicle accessibility.
While new facilities are not required as a result of the project, future development is required by ordinance to pay Public Facility Fees to the City for future construction of Fire Department facilities that may be required elsewhere in the City. For retail development, the City charges $0.28 per square foot in fire protection fees. Compliance with the applicable codes and City standards, along with payment of mitigation fees, would reduce project impacts on fire protection services to a level that would be less than significant. b) Police Protection.
The project would generate a demand for police protection services. The General Plan EIR did not identify any significant impacts of future development under the General Plan on police protection services (City of Livingston 1999b). As discussed in Chapter 12.0, Land Use and Population, the project is not expected to affect the City’s population in a manner unplanned by the City. Because of this, the project is not expected to affect the officer/population ratio such that new officers would need to be hired. As noted, the Livingston Police Department has plans to add a second story to its existing facility, which would accommodate additional personnel as needed. The Police Chief has indicated that the project would not require this or other improvements to provide service (Chris Soria, pers. comm.).
Livingston Truck Stop Complex IS/MND 3-47 December 2020 Future development is required by ordinance to pay mitigation fees to the City for future construction of Police Department facilities that may be required. For retail development, the City charges $0.84 per square foot in police protection fees. With payment of mitigation fees, project impacts related to police protection services would be less than significant. c) Schools.
The project involves commercial development that would generate employment opportunities. Some employees may move to Livingston with their families, thereby placing some increment of demand on LUSD and MUHSD schools. The number of new students that would enroll in Livingston schools as a result of the project is expected to be minor, if any. New project employees would consist of residents of the City and vicinity (see Section 3.14, Population and Housing).
California Education Code Section 17620 authorizes school districts to levy a fee on residential and commercial/industrial development projects for the purpose of funding the construction or modernization of school facilities. The basis of developer fees is the relationship between new development and the impact on school districts to provide adequate school facilities for the student population that new development generates. Both LUSD and MUHSD impose developer fees for commercial development that would apply to the project. According to California Government Code Section 65995(h), the payment of developer fees is deemed full and complete mitigation of the impacts of a development project on schools. Because of this and the minimal number of students the project would generate, project impacts on school services would be less than significant. d, e) Parks and Other Public Facilities.
As discussed in Section 3.14, Population and Housing, the population increase resulting from the project is not expected to be significant. Therefore, additional demands on parks and other public facilities such as libraries are expected to be incremental, and no new or expanded public facilities would be required. The City charges mitigation fees for municipal facilities. For commercial development, this fee is $0.75 per square foot of building floor area. With payment of mitigation fees, project impacts would be less than significant.
3.16 RECREATION
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facilities would occur or be accelerated?
Livingston Truck Stop Complex IS/MND 3-48 December 2020 b) Include recreational facilities or require the construction or expansion of recreational facilities that might have an adverse physical effect on the environment?
NARRATIVE DISCUSSION
Environmental Setting
As discussed in Section 3.15, Public Services, the Livingston Recreation Department manages parks and recreation programs in the City. The City has six parks and recreational facilities. Amenities available at these facilities include picnic areas, barbeques, playgrounds, baseball and soccer fields, a volleyball area, and a stage. The nearest City park to the project site is Livingston Memorial Park on Main Street.
Outside the City, McConnell State Recreation Area is on the Merced River approximately
2.5 miles north of the project site. This facility offers picnic and camping areas. Yosemite National Park is approximately 72 miles east-northeast of the project site.
Environmental Impacts and Mitigation Measures
a, b) Recreational Facilities.
As discussed in Section 3.14, Population and Housing, the population increase resulting from the project is not expected to be significant. The proposed commercial development would not generate any population increase or a demand for new or expanded parks or recreational facilities or services. Project impacts on recreational facilities are considered less than significant.
3.17 TRANSPORTATION
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Conflict with a program, plan, ordinance, or policy
addressing the circulation system, including transit,
roadway, bicycle, and pedestrian facilities?
b) Conflict with or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)?
c) Substantially increase hazards to a geometric design feature (e g., sharp curves or dangerous intersections) or incompatible uses (e g, farm equipment)?
d) Result in inadequate emergency access?
v
v
v
v
Livingston Truck Stop Complex IS/MND 3-49 December 2020
NARRATIVE DISCUSSION
Environmental Setting
Information for this section primarily comes from a traffic study conducted for the project by KD Anderson and Associates, which shown in Appendix D of this document.
Streets and Intersections
The roadway network serving the project site consists of the State Route (SR) 99 freeway, Hammatt Avenue, which forms an interchange with SR 99 at the project site, and Campbell Boulevard. The project site is adjacent to all three roadways. • SR 99 is the primary north-south transportation corridor through Merced County.
Near the project site, it has a west-northwest to east-southeast alignment. SR 99 is a controlled access freeway with a six-lane width southeast of Hammatt Avenue and a four-lane width northwest of Hammatt Avenue. Project access to SR 99 is primarily provided via the Hammatt Avenue interchange, which is immediately adjacent to the site. The most recent traffic count data available from Caltrans (2017) indicate that SR 99 carries an average annual daily traffic (AADT) volume of 60,000 to 62,000 vehicles per day and peak hour volume of 5,500 to 5,800 in the vicinity of the project site. Trucks comprise 24% of the daily traffic volume on SR
99. • Hammatt Avenue is designated an arterial street in the Circulation Element of the Livingston General Plan Livingston. Near the project site, Hammatt Avenue is a north-south, two-lane roadway, although the Circulation Element of the Livingston General Plan notes that a five-lane section is planned in the future. Hammatt Avenue begins at an intersection on Peach Avenue and continues north across SR 99 to its northern terminus at Olive Avenue at the northern City limits. The Hammatt Avenue interchange is one of two interchanges providing the Livingston area with access to SR 99. North of F Street in the vicinity of the interchange with SR 99, the adjacent land uses include existing, approved, and proposed nonresidential uses. Traffic count data collected in 2019 indicated a daily traffic volume on Hammatt Avenue south of SR 99 of 9,222 vehicles per day. The daily volume north of SR 99 is estimated to be 10,800 vehicles per day, based on the peak hour traffic counts collected for this analysis.
• Campbell Boulevard is also designated an arterial street in the Circulation Element of the Livingston General Plan. Campbell Boulevard lies parallel to and north of SR 99 and extends from the SR 99/Winton Parkway interchange across Hammatt Avenue into Merced County and the SR 99/Sultana Drive – Liberty Avenue interchange. Near the project site, Campbell Boulevard is a two-lane roadway. In the area east of Hammatt Avenue, adjacent land uses are primarily light industrial.
The daily traffic volume on Campbell Boulevard east of Hammatt Avenue is estimated to be 1,800 vehicles per day.
Livingston Truck Stop Complex IS/MND 3-50 December 2020 Other streets and road potentially affected by the project include:
• F Street is an east-west street that traverses Livingston south of SR 99. F Street originates at the Flint Avenue/Robin Avenue intersection and continues easterly across Hammatt Avenue to Dwight Way. This two-lane roadway is designated a Collector in the Circulation Element. The land uses along F Street west of Hammatt Avenue are primarily residential, while agricultural and commercial uses exist in the east. Based on the peak hour volume collected for the study the daily traffic volume west of Hammatt Avenue is estimated to be 3,850 vehicles per day. • Industrial Drive is a local street that provides access to the commercial area east of Hammatt Avenue and north of Campbell Boulevard. This two-lane street intersects Campbell Boulevard about 500 feet east of the Hammatt Avenue intersection and extends northerly for 1,100 feet to Walnut Avenue. The land uses along Industrial Drive are light-industrial/warehousing.
The SR 99/Hammatt Avenue interchange is a diamond configuration with roughly 550 feet between ramp intersections. Under Caltrans convention, SR 99 is a north-south freeway, and the ramps are thus designated “northbound” (NB) and “southbound” (SB) even though the alignment of the freeway through Livingston is east to west. Campbell Boulevard intersects Hammatt Avenue about 430 feet from the SR 99 NB ramps intersection, and the F Street intersection is about 725 feet from the SR 99 SB ramps. The SR 99 off-ramps terminate at all-way stop controlled intersections. The SB off-ramp is 1,330 feet long, and the NB off-ramp is 1,240 feet long. The on-ramp areas are of similar length. Both the NB on-ramp and SB on-ramp are about 1,350 feet long and are followed by a 250-foot-long auxiliary lane. Caltrans publishes daily traffic volume information for freeway ramps, and the most recent data is summarized in Table 1 of the traffic study.
Table 3-6 indicates existing traffic flow conditions at four stop sign-controlled intersections analyzed in the traffic study. Traffic conditions are measured in average time of delay and Level of Service (LOS) at each of the intersections during the morning peak hour and the evening peak hour of traffic. LOS “grades” traffic conditions from A to F, with A representing the best traffic conditions (no delay at the intersection). The City of Livingston considers LOS C as the minimally acceptable LOS for intersections. As indicated in Table 3-6, two of the study intersections operate at an acceptable LOS during both the morning and evening peak hours. Although the Hammatt Avenue/Campbell Boulevard intersection at the eastbound approach operates overall at an acceptable level with minimum delay, the westbound approach operates at an unacceptable LOS during both peak hours. The Hammatt Avenue/SR 99 NB ramps intersection also operates at an unacceptable LOS during both peak hours.
The traffic study also evaluated the LOS at the ramp junctions at the SR 99/Hammatt Avenue interchange. Freeway ramp junction LOS is predicated on the hourly mainline traffic volume as well as the volume of traffic on specific ramps. Table 3-7 identifies current LOS at these freeway ramp junctions. As shown, all operate at LOS D or better during the morning and evening peak hour. Unlike City intersections, Caltrans considers LOS D an acceptable LOS for ramp junctions.
Livingston Truck Stop Complex IS/MND 3-51 December 2020 TABLE 3-6
LOS AT STUDY INTERSECTIONS – EXISTING CONDITIONS
Intersection Control
AM Peak Hour PM Peak Hour
Average
Delay (sec.) LOS Average Delay (sec.) LOS
Hammatt Ave./Campbell Blvd.
Eastbound East/west stop 14.5 B 14.2 B
Westbound 68.0 F 44.7 E
Hammatt Ave./SR 99 NB Ramps All-way stop 36.5 E 26.1 D
Hammatt Ave./SR 99 SB Ramps All-way stop 23.3 C 19.8 C
Hammatt Ave./F Street All-way stop 14.1 B 14.2 B
Notes: Bold values indicate unacceptable City LOS (D, E or F).
Source: KD Anderson and Associates 2020.
TABLE 3-7
LOS AT RAMP JUNCTIONS – EXISTING CONDITIONS
Ramp Junction Type
AM Peak Hour PM Peak Hour
Ramp
Volume Density LOS
Ramp
Volume Density LOS
SB Hammatt Ave off Diverge 206 27.7 C 402 34.8 D
SB Hammatt Ave on Merge 296 25.8 C 290 30.4 D
NB Hammatt Ave off Diverge 307 31.3 D 289 29.2 D
NB Hammatt Ave on Merge 338 28.4 D 247 26.0 C
Notes: Ramp volume – vehicles per hour. Density – passenger cars per lane per mile.
Source: KD Anderson and Associates 2020.
Livingston Truck Stop Complex IS/MND 3-52 December 2020 As noted, two of the four study intersections currently operate with LOS that exceed the City’s LOS C minimum. However, peak hour traffic signal warrants are notsatisfied during more than one time period, and the length of existing peak period queues does not exceed the available storage length or extend back into adjoining intersections. Adequate LOS are delivered at freeway ramp junctions; therefore, no capacity improvements are needed for these facilities at this time. However, the City is currently working to design and construct intersection improvements to the Hammatt Avenue/Campbell Boulevard intersection, and that work would include a traffic signal.
SB 743
The State of California has recently added Section 15064.3 to the CEQA Guidelines, which incorporates the requirements of SB 743 into CEQA analysis. SB 743, enacted in 2013, seeks to balance traffic impacts and mitigation with statewide GHG emission reduction goals, by eliminating street and intersection capacity as the principal means for evaluating transportation impacts.
Section 15064.3 states that vehicle miles traveled (VMT) is the preferred method for evaluating transportation impacts, rather than the commonly used LOS. While a quantitative analysis of VMT is preferred, a qualitative analysis may be used if existing models or methods are not available to estimate VMT for the project being considered. The Governor’s Office of Planning and Research has issued a Technical Advisory on evaluating transportation impacts using VMT. The Technical Advisory states that residential, office, and retail projects tend to have the greatest influence on VMT (OPR 2018).
The following impact analysis conforms to this guidance by analyzing project VMT.
Capacity-related concerns are nonetheless addressed, not as potentially significant effects on the environment but rather as to consistency with City LOS standards.
Alternative Transportation Modes
Public Transportation
Public transportation services in Livingston are provided by The Bus, overseen by the Transit Joint Powers Authority for Merced County and managed through MCAG. The Bus operates the Livingston Commuter route (L Line) that connects Livingston with Merced via Winton and Atwater. The L Line operates along Walnut Avenue with a stop at the Franci Street intersection approximately one-half mile north of the project site. The Turlock Commuter route (T Line), between Merced and Turlock in Stanislaus County, provides service in the project vicinity along Hammatt Avenue to the Walnut Avenue/Franci Street stop.
Bicycle and Pedestrian Facilities
The Circulation Element of the City General Plan includes a Bikeways Plan that designates a bikeway along Campbell Boulevard from Hammatt Avenue to Winton Parkway. The City of Livingston also adopted a Bicycle Plan in November 2005, which designates a bikeway along Hammatt Avenue from Walnut Avenue to Peach Avenue. The City of Livingston currently has no designated bicycle facilities near the project site.
Livingston Truck Stop Complex IS/MND 3-53 December 2020 There is existing sidewalk along the west side of Hammatt Avenue from Walnut Avenue to F Street. The east side of Hammatt Avenue has partial sidewalk from Walnut Avenue to Campbell Boulevard. There is also existing sidewalk along the north side of Campbell Boulevard from East Avenue to Hammatt Avenue. There are no other sidewalk in the vicinity of the project site.
Environmental Impacts and Mitigation Measures
a) Conflict with Applicable Plans, Ordinances and Policies.
Motor Vehicle Transportation Plans
The traffic study evaluated projected traffic operations at the study intersections with the addition of the project under Existing Plus Project-Phase 1 and Existing Plus ProjectBuildout conditions. Operations under both conditions are described below.
Existing Plus Project-Phase 1
Table 3-8 shows estimated traffic operations under Existing Plus Project-Phase 1 conditions, with a more detailed analysis shown in the traffic study in Appendix D. As shown in Table 3-8, the Hammatt Avenue/F Street intersection operates at an acceptable LOS during both the morning and evening peak hours. Although the Hammatt Avenue/Campbell Boulevard intersection at the eastbound approach operates overall at an acceptable LOS, the westbound approach operates at an unacceptable LOS during both peak hours. The Hammatt Avenue/SR 99 NB ramps intersection also operates at an unacceptable LOS during both peak hours. The Hammatt Avenue/SR 99 SB ramps intersection operates at an acceptable LOS during the evening peak hour but at an unacceptable LOS during the morning peak hour.
TABLE 3-8
LOS AT STUDY INTERSECTIONS – EXISTING PLUS PROJECT
PHASE 1 CONDITIONS
Intersection Control
AM Peak Hour PM Peak Hour
Average
Delay (sec.) LOS Average Delay (sec.) LOS
Hammatt Ave./Campbell Blvd.
Eastbound East/west stop 19.0 C 19.3 C
Westbound >300 F >300 F
Hammatt Ave./SR 99 NB Ramps All-way stop 88.5 F 60.0 F
Hammatt Ave./SR 99 SB Ramps All-way stop 29.7 D 24.8 C
Hammatt Ave./F Street All-way stop 19.7 C 19.3 C
Notes: Bold values indicate unacceptable City LOS (D, E or F).
Source: KD Anderson and Associates 2020.
Livingston Truck Stop Complex IS/MND 3-54 December 2020 With Phase 1, the addition of project-generated automobile and truck traffic onto the adjacent street system would result in two intersections operating with delays that are indicative of LOS F, and one intersection operating at LOS D. Peak hour traffic signal warrants will be satisfied both time periods at the Hammatt Avenue/Campbell Boulevard intersection and during one time period at the two SR 99 ramp intersections. This is an important traffic impact but not a significant effect under CEQA as discussed above.
Provisions for transportation system improvements presented below would ensure that traffic conditions would operate to City standards at the deficient intersections, reducing impacts to an acceptable level consistent with the Livingston General Plan as shown in the traffic study.
Transportation Improvement Measures:
TRANS-1: The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/Campbell Boulevard intersection.
TRANS-2: The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 southbound ramps. The project applicant or successors in interest shall be required to pay fair-share costs of preparing a preliminary Intersection Control Evaluation report to provide a screening assessment of the feasibility of a roundabout or traffic signal at the SR 99 ramps intersections.
Existing Plus Project-Buildout
Table 3-9 shows estimated traffic operations under Existing Plus Project-Buildout conditions, with a more detailed analysis shown in the traffic study in Appendix D. As shown in Table 3-9, the resulting LOS at the intersections are similar to those under Phase 1 conditions. The most notable differences are that the Hammatt Avenue/SR 99 SB ramps intersection operates at an unacceptable LOS during both the morning and the evening peak hours, and that the Hammatt Avenue/Campbell Boulevard intersection at the eastbound approach operates at an unacceptable LOS during the morning peak hour.
Livingston Truck Stop Complex IS/MND 3-55 December 2020 TABLE 3-9
LOS AT STUDY INTERSECTIONS – EXISTING PLUS PROJECT
BUILDOUT CONDITIONS
Intersection Control
AM Peak Hour PM Peak Hour
Average
Delay (sec.) LOS Average Delay (sec.) LOS
Hammatt Ave./Campbell Blvd.
Eastbound East/west stop 25.4 D 22.0 C
Westbound >300 F >300 F
Hammatt Ave./SR 99 NB Ramps All-way stop 125.7 F 86.4 F Hammatt Ave./SR 99 SB Ramps All-way stop 35.7 E 28.4 D
Hammatt Ave./F Street All-way stop 21.7 C 20.3 C
Notes: Bold values indicate unacceptable City LOS (D, E or F).
Source: KD Anderson and Associates 2020.
With buildout, the addition of project-generated automobile and truck traffic onto the adjacent street system would result in two intersections operating with delays that are indicative of LOS F, and one intersection operating at LOS E. Peak hour traffic signal warrants will be satisfied both time periods at the Hammatt Avenue/Campbell Boulevard intersection and during one time period at the two SR 99 ramp intersections. This is an important traffic impact, but not a significant effect under CEQA as discussed above. In addition to the transportation improvements that address Phase 1 conditions, the additional requirements presented below would ensure that traffic conditions at these intersections would operate at a level consistent with City standards, thereby reducing impacts to an acceptable level, consistent with the Livingston General Plan.
Transportation Improvement Measures:
TRANS-3: The project applicant or successors in interest shall be required to pay fair-share costs of the addition of an eastbound right-turn lane, approximately 200 feet in length, on Campbell Boulevard with right turn overlap phases on the northbound-to-eastbound and eastboundto-southbound movements.
Ramp Junctions
Table 3-10 identifies Existing Plus Project-Buildout LOS and peak hour volumes on the ramps at the SR 99/Hammatt Avenue interchange. As shown, with one exception, all ramps would operate at LOS C or D during the morning and evening peak hours, meeting or exceeding the Caltrans minimum LOS standard. The exception is the SB off ramp, which is projected to operate at LOS E in the evening peak hour. While LOS E exceeds the minimum standard, the 2018 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) indicates that SR 99 is expected to be widened to six lanes in the near Livingston Truck Stop Complex IS/MND 3-56 December 2020 future (MCAG 2018). With this improvement, this ramp diverge will satisfy the minimum LOS D goal. Because conditions at this location at buildout are barely LOS E, conditions with Phase 1 would remain at LOS D at this off ramp. All other ramp junctions would at least meet Caltrans minimum LOS standards under Phase 1 conditions. No improvements would be required.
TABLE 3-10
LOS AT RAMP JUNCTIONS – BUILDOUT CONDITIONS
Ramp Junction Type
AM Peak Hour PM Peak Hour
Ramp
Volume Density LOS
Ramp
Volume Density LOS
SB Hammatt Ave off Diverge 275 28.0 C 463 35.0 D-E
SB Hammatt Ave on Merge 380 26.1 C 359 30.6 D
NB Hammatt Ave off Diverge 394 31.6 D 366 29.5 D
NB Hammatt Ave on Merge 424 28.6 D 301 26.0 C
Notes: Ramp volume – vehicles per hour. Density – passenger cars per lane per mile.
Bold values indicate unacceptable Caltrans LOS (E or F).
Source: KD Anderson and Associates 2020.
Non-vehicular Transportation Plans
The project would have no impact on the future development of bikeways in the project vicinity, as described in the Circulation Element of the City’s General Plan and the City’s Bicycle Plan. Phase 1 development may result in pedestrians wishing to walk between the site and the remainder of Livingston. Since no pedestrian facilities currently exist from the project site to the City, the lack of such facilities is a potentially significant impact.
Mitigation presented below would provide a safe route along Campbell Boulevard and a safe crossing on Hammatt Avenue. Implementation of this mitigation measure would reduce impacts related to pedestrian movement to a level that would be less than significant.
Mitigation Measures:
TRANS-4: The project applicant or successors in interest shall install frontage improvements along Campbell Boulevard, including sidewalks, during Phase 1 development of the project site (see Mitigation Measure TRANS-1). Standard pedestrian crossing controls and ADAaccessible ramps shall be included in the proposed signalization of the Hammatt Avenue/Campbell Boulevard intersection, and the project shall contribute its fair share to the cost of those features.
Livingston Truck Stop Complex IS/MND 3-57 December 2020 b) Conflict with CEQA Guidelines Section 15064.3(b).
As noted, Section 15064.3 states that VMT is the preferred method for evaluating transportation impacts, rather than the commonly used LOS. The VMT metric measures the total miles traveled by vehicles as a result of a given project. VMT accounts for the total environmental impact of transportation associated with a project, including use of non-vehicle travel modes. Section 15064.3(b) sets forth the criteria for analyzing transportation impacts using the preferred VMT metric:
• VMT exceeding an applicable threshold of significance may indicate a significant impact. The City of Livingston currently does not have traffic impact standards based on VMT.
• Generally, projects within one-half mile of either an existing major transit stop or a stop along an existing “high-quality transit corridor” should be presumed to cause a less-than-significant transportation impact. There are no such stops or corridors near the project site
• Projects that decrease VMT in the project area compared to existing conditions should be presumed to cause a less-than-significant transportation impact.
The project is a truck stop, which has retail components in the convenience store and the quick-serve restaurants. However, the primary purpose of the project is to provide service to commercial trucks, including fueling and repair services. Also, all services provided by the project are primarily oriented to vehicles traveling on SR 99. Most vehicle trips associated with the project would be diverted from SR 99. The project would have a more limited orientation to City residents, with local trips mainly generated by truck stop employees or by residents patronizing the quick-serve restaurants.
As noted in Section 3.11, Land Use, the project is consistent with the Livingston General Plan and with existing zoning. The project also would not conflict with the preferred scenario described in the 2018 RTP/SCS prepared by MCAG, which focuses on infill residential development in downtown cores near jobs and services and limits development in new growth areas by adding no new unincorporated communities (MCAG 2018). Given all this, project impacts related to CEQA Guidelines Section 15064.3(b) are considered less than significant.
c) Traffic Hazards.
The project would involve development of private property adjacent to Campbell Boulevard and Hammatt Avenue. Access to the site and frontage improvements will be designed and constructed in accordance with adopted City standards and subject to the review and approval of the City Engineer. As noted, mitigation measures would require the project to contribute fair-share costs to facilities that would increase the safety of traffic movement.
The traffic study evaluated potential traffic queuing under Phase 1 and buildout conditions.
Queue lengths that exceed available storage in turn lanes or reach adjoining intersections could create an appreciable safety issue. An analysis of potential queue lengths typically is Livingston Truck Stop Complex IS/MND 3-58 December 2020 based on the “95th Percentile Queue,” which is the queue length (in vehicles) that has only a 5-percent probability of being exceeded during the analysis time period. It is a useful parameter for determining the appropriate length of turn pockets. The traffic study concluded that existing 95th percentile queues can be accommodated by the existing street system. However, at project buildout, the queue of southbound traffic extending back from the Hammatt Avenue/SR 99 NB ramps intersection would reach the Campbell Boulevard intersection in both the morning and evening peak hours. This would be a safety issue and therefore a potentially significant impact. The improvements needed to address LOS, as noted earlier in this section, would also deal with this issue. No additional transportation improvement measures would be required.
Turning requirements are important with regards to legal truck circulation. The project would attract full-size trucks already permitted on SR 99 (i.e., STAA) turning into and out of the site via the Hammatt Avenue/Campbell Boulevard intersection and at the SR 99 ramps intersections. Review of the current layout of each intersection indicates that STAA vehicles can travel legally from the SR 99 interchange to the project site. However, this will need to be confirmed as improvement plans are developed, and the City may need to make a formal application for STAA designation on the affected portions of Hammatt Avenue and Campbell Boulevard. Mitigation described below would ensure that STAA trucks can be accommodated by the project, thereby reducing potential safety impacts to a level that would be less than significant.
Mitigation Measures:
TRANS-5: Improvements to the Hammatt Avenue/Campbell Boulevard intersection shall be designed to accommodate STAA trucks, and the project shall contribute its fair share to the cost of those features.
Project access shall be designed to accommodate STAA trucks. Phase 1 shall contribute its fair share to the cost of a Caltrans STAA route designation application to be completed by the City and shall contribute its fair share to the cost of improvements needed to accommodate STAA trucks.
d) Emergency Access.
Access to the project site would be provided off Campbell Boulevard by several driveways, thereby providing adequate access for emergency vehicles. Project impacts on emergency vehicle access would be less than significant.
Livingston Truck Stop Complex IS/MND 3-59 December 2020
3.18 TRIBAL CULTURAL RESOURCES
Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section
5020.1(k), or
b) A resource determined by the lead agency, in its
discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1? In applying the
criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the
significance of the resource to a California Native American tribe.
NARRATIVE DISCUSSION
Environmental Setting
As noted in Section 3.5, Cultural Resources, the City of Livingston lies within the historic territory of the Yokuts, which ranged from the Tehachapi Mountains to modern-day Stockton in the San Joaquin Valley. Settlements were oriented towards water resources, with major villages situated near waterways that provided reliable water supplies and substantial food sources. A Yokut village was reported to have 200 to 300 people.
Economic subsistence was based on acorns, along with gathering and processing of wild seeds and other vegetable foods. Rivers and streams provided fish, shellfish, and turtles, and game, wildfowl and small mammals were trapped to augment the diet. Trade with other tribes was well developed, as the Yokuts obtained resources not otherwise available in their territory, such as obsidian and shell beads. Diseases introduced by Europeans took their toll on the Yokuts and other tribes, as up to three-quarters of the population in the San Joaquin Valley died from malaria alone.
In 2014, the California Legislature enacted Assembly Bill (AB) 52, which focuses on consultation with Native American tribes on land use issues potentially affecting the tribes.
The intent of this consultation is to avoid or mitigate potential impacts on “tribal cultural resources,” which are defined as “sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe.” Under AB 52, when a tribe requests consultation with a CEQA lead agency on projects within its traditionally and culturally affiliated geographical area, the lead agency must provide the tribe with notice of a proposed project within 14 days of a project application being deemed complete v
v
Livingston Truck Stop Complex IS/MND 3-60 December 2020 or when the lead agency decides to undertake the project, if it is the agency’s own project.
The tribe has up to 30 days to respond to the notice and request consultation; if consultation is requested, then the local agency has up to 30 days to initiate consultation.
The Native American Heritage Commission conducted a search of its Sacred Lands file.
Appendix C contains the search results, which indicated that no Sacred Lands have been recorded on the project site. The City of Livingston has not been identified as an area of interest by any tribe for consultation, including the Yokuts (Hatch, electronic mail, November 13, 2019). Since no tribe has requested to be consulted by the City on projects, AB 52 consultation will not occur.
Environmental Impacts and Mitigation Measures
a, b) Tribal Cultural Resources.
As noted in Section 3.5, Cultural Resources, no archaeological resources have been recorded on or near the project site. Project construction could potentially uncover previously unknown archaeological resources, including those of Native American origin.
Mitigation Measure CULT-1 would require construction work to stop at an uncovered resource site under an archaeologist can evaluate the resource and give recommendations for its disposition. Mitigation Measure CULT-2 sets procedures for the treatment of any Native American remains that may be uncovered during project construction.
Implementation of these mitigation measures would reduce potential impacts on tribal cultural resources to a level that would be less than significant.
Level of Significance: Potentially significant
Mitigation Measures: Implementation of Mitigation Measures CULT-1 and CULT-2 Significance After Mitigation: Less than significant
3.19 UTILITIES AND SERVICE SYSTEMS
Would the project: Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment, or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development
during normal, dry, and multiple dry years?
c) Result in a determination by the wastewater treatment provider that would serve the project that it has adequate v
v
v
Livingston Truck Stop Complex IS/MND 3-61 December 2020 capacity to serve the project's projected demand in addition to the provider's existing commitments?
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
NARRATIVE DISCUSSION
Environmental Setting
Wastewater
The City of Livingston collects and treats wastewater generated by City residents and businesses. The City’s wastewater collection system consists of 29 miles of sewer lines ranging in diameter from 6 to 27 inches (Merced County LAFCo 2018). There is a 12-inch diameter sewer line and a 10-inch diameter sewer line that extend beneath Campbell Boulevard along the project site frontage.
The collected wastewater is conveyed to the Domestic Wastewater Treatment Plant, located on Vinewood Avenue and Washington Boulevard northwest of Livingston. The average wastewater flow into the treatment plant is 1.06 million gallons per day (mgd).
The Domestic Wastewater Treatment Plant currently has adequate capacity to treat an average wastewater flow of 2.0 mgd (City of Livingston 2016).
Potable Water
The City provides potable water to City residents and businesses. As noted in Section 3.10, Hydrology and Water Quality, the City obtains its water from local aquifers through eight wells. Until recently, the City wells had individual production capacities ranging from 970 to 1,140 gallons per minute. As of 2008, City wells had a supply capacity of approximately
10.8 mgd. In 2005, the City produced approximately 5.8 mgd of water. The City recently added a new groundwater well to its system, Well No. 17; the well’s production capacity adds approximately 2.9 mgd to the City’s water production capacity.
The City’s water system includes a storage tank with a capacity of one million gallons and more than 36 miles of pressurized water lines ranging in diameter from 2 to 16 inches. A water line 12 inches in diameter is located within adjacent Hammatt Avenue (Martinez, pers. comm.). Another water line extends along Campbell Boulevard from Hammatt Avenue to the intersection with Industrial Drive.
v
v
Livingston Truck Stop Complex IS/MND 3-62 December 2020 Storm Drainage
Storm drainage generated in the developed areas of the City is collected by a municipal system composed of underground storm drains, detention and percolation basins, and Merced Irrigation District canals and laterals via pump stations. A storm drainage line of 18 inches diameter extends beneath Campbell Boulevard and terminates into an existing detention facility adjacent to Hammatt Avenue (City of Livingston 2007). As noted in Section 3.10, Hydrology and Water Quality, the City has an adopted SWMP, developed in compliance with the federal NPDES program and with the SWRCB’s MS4 General Permit.
The SWMP requires preparation of a construction SWPPP and incorporation of postconstruction BMPs into the project to protect water quality.
Solid Waste
Solid waste is collected in Livingston by Gilton Solid Waste Management, Inc., under contract with the City. On average, approximately 1,097 tons of solid waste is collected in Livingston per month. The collected solid waste is transported to one of two landfills in Merced County. The Billy Wright Landfill, approximately one mile west of Interstate 5 near Los Banos, has a maximum permitted disposal capacity of 14,800,000 cubic yards.
As of September 30, 2010, this landfill had a remaining capacity of 11,370,000 cubic yards (CalRecycle 2018a). The Highway 59 Landfill, along SR 59 approximately six miles north of Merced, has a maximum permitted disposal capacity of 30,012,352 cubic yards. As of September 1, 2005 – the latest date for which information was available – this landfill had a remaining capacity of 28,025,334 cubic yards (CalRecycle 2018b).
Environmental Impacts and Mitigation Measures
a) Relocation or Construction of Utility Facilities.
The project would connect to existing sewer lines in Campbell Boulevard adjacent to the site. No new or extended sewer mains would need to be installed. As noted above, an existing water line is also available for connection along Campbell Boulevard. The project can connect to the City’s water system without extension of water lines.
Storm drainage would be collected by an on-site drainage system that would be sent to a new detention basin to be constructed at the southeastern end of the project site. The detention basin would be designed and constructed in accordance with City specifications.
Overall, utility facility impacts would be less than significant. b) Water Supplies.
The project would place additional demand on the City’s water distribution system. Based on average usage of 2,675 gallons per day per acre for non-residential areas, the water demand of the project at full buildout would be approximately 6,206 gallons per day, or
2.27 mgd (City of Livingston 1992b). This figure is likely an overestimate, as the City’s Water Distribution System Master Plan combined commercial and industrial uses for its non-residential average usage figure. As indicated above, the City’s water system had approximately 10.8 mgd of available water supply in 2008, and the available potable water capacity was recently increased by approximately 2.9 mgd with the addition of Well 17.
Livingston Truck Stop Complex IS/MND 3-63 December 2020 The City would have adequate capacity to accommodate the water demands of the project without requiring additional water supplies. Project impacts on water supplies would be less than significant.
c) Wastewater Treatment Capacity.
The project would place additional demand on the City’s wastewater collection and treatment system. Based on an average flow of 4,000 gallons per day per acre for industrial users, the amount of wastewater that would be generated by the project would be approximately 9,280 gallons per day (City of Livingston 1992a). Again, this figure is likely an overestimate; the City’s Sewer Collection System Master Plan did not estimate average flow for commercial uses, which are generally lower than for industrial uses. As indicated above, the Domestic Wastewater Treatment Plant currently has available capacity of 2.0 mgd on average. The City’s wastewater treatment system would have adequate capacity to accommodate wastewater generated by the project without requiring additional capacity.
Project impacts on wastewater treatment capacity would be less than significant. d) Solid Waste Services.
As noted above, the City generates 1,097 tons of solid waste per month. Project development would add incrementally to this total. As indicated above, the two landfills that accept the City’s solid waste have available capacity to accommodate the additional waste. AB 341 requires businesses that produce four or more cubic yards of waste per week to recycle, reuse and/or divert some of their waste from waste. Also, AB 1826 requires businesses that generate at least eight cubic yards of waste per week to arrange for organic waste service. It is expected that the project would comply with these requirements should the waste it generates meets these criteria, thereby reducing the need for additional landfill capacity. Impacts on solid waste services are considered less than significant. e) Compliance with Solid Waste Regulations.
As noted, the project is expected to comply with AB 341 and AB 1826 requirements should the waste it generates meet the criteria specified in these bills. The project is expected to comply with all applicable federal, state, and local solid waste regulations. The project would have no impact related to compliance with solid waste regulations.
3.20 WILDFIRE
If located in or near State Responsibility Areas or lands classified as Very High Fire Hazard Severity Zones, would the project:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
a) Substantially impair an adopted emergency response plan or emergency evacuation plan?
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
v
v
Livingston Truck Stop Complex IS/MND 3-64 December 2020 c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes?
NARRATIVE DISCUSSION
Environmental Setting
As noted in Section 3.9, Hazards and Hazardous Materials, wildland fires are an annual hazard in Merced County, including the Livingston vicinity. Wildland fires burn natural vegetation on undeveloped lands and include rangeland, brush, and grass fires.
The California Department of Forestry and Fire Protection’s Fire and Resource Assessment Program identifies fire threat based on a combination of two factors: 1) fire frequency, or the likelihood of a given area burning, and 2) potential fire behavior (hazard). These two factors are combined in determining the following Fire Hazard Severity Zones: Moderate, High, Very High, Extreme. These zones apply to designated State Responsibility Areas – areas in which the State has primary firefighting responsibility. The project site is not within a State Responsibility Area and therefore has not been placed in a Fire Hazard Severity Zone for such areas (Cal Fire 2007a). Both the project site and surrounding area are in a Local Responsibility Area, and neither are in any designated fire hazard severity zones (Cal Fire 2007b).
Environmental Impacts and Mitigation Measures
a) Emergency Response Plans and Emergency Evacuation Plans.
As discussed in Section 3.9, Hazards and Hazardous Materials, project construction work would mostly occur on the project site, with work on adjacent roads limited to connection to utility lines. Such work is not expected to require closure of the roads, so neither project construction nor operation is expected to obstruct emergency vehicle operations or evacuations that may occur in the area. Project impacts on emergency response or emergency evacuation plans would be less than significant. b) Exposure of Project Occupants to Wildfire Hazards.
The project site is not part of a State Responsibility Area, and Cal Fire maps indicate the site is not designated within a Very High Fire Hazard Severity Zone or a zone of higher severity for either state or local responsibility areas. The project site is in an area consisting of a mix of developed and agricultural land. Neither of these lands is prone to wildfires.
The project would reduce the existing fire hazard on the project site by replacing existing grasses and weeds with development and landscaping. The project would have no impact related to exposure of project occupants to wildfire hazards. v
v
Livingston Truck Stop Complex IS/MND 3-65 December 2020 c) Installation and Maintenance of Infrastructure.
The project proposes the installation of roads and parking areas and the extension of utilities. The installation of these facilities is not expected to exacerbate the wildfire risk on the project site, which is minimal as explained in b) above. The project would have no impact related to exacerbation of wildfire hazards by infrastructure improvements. d) Risks from Runoff, Post-Fire Slope Instability, or Drainage Changes.
The project site is in a topographically flat area. There are no streams or other channels that cross the site. As such, it is not expected that people or structures would be exposed to significant risks from changes resulting from fires in steeper areas, including downslope or downstream flooding or landslides. The project would have no impact related to risks from runoff, post-fire slope instability, or drainage changes.
3.21 MANDATORY FINDINGS OF SIGNIFICANCE
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community,
substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important
examples of the major periods of California history or
prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? "Cumulatively
considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)?
c) Does the project have environmental effects which would cause substantial adverse effects on human beings, either directly or indirectly?
NARRATIVE DISCUSSION
a) Findings on Biological and Cultural Resources.
The project’s potential biological and cultural resource impacts were described in Sections
3.4 and 3.5, respectively. No potentially significant environmental effects were identified for biological resources. Potentially significant effects were identified for cultural v
v
v
Livingston Truck Stop Complex IS/MND 3-66 December 2020 resources, but none that would not be reduced to a level that would be less than significant with mitigation.
b) Findings on Individually Limited but Cumulatively Considerable Impacts.
As described in this Initial Study, the potential environmental effects of the project would either be less than significant, or the project would have no impact at all, when compared to the baseline. Where the project involves potentially significant effects, these effects would be reduced to a level that is less than significant with proposed mitigation measures and compliance with required permits and applicable regulations.
The potential cumulative impacts of urban development of the site were accounted for in the Livingston General Plan EIR (1999b). The potential environmental effects identified in this Initial Study have been considered in conjunction with each other as to their potential to generate other potentially significant effects. The various potential environmental effects of the project would not combine to generate any potentially significant cumulative effects.
There are no other known, similar projects with which the project might combine to produce adverse cumulative impacts.
The traffic study analyzed traffic operations associated with the project under cumulative conditions. Cumulative traffic volume forecasts were prepared based on a list of approved projects identified in consultation with City staff and representing development projects likely to add traffic in the study area (see Table 15 of traffic study in Appendix D). It was assumed that no future improvements to the SR 99/Hammatt Avenue interchange and the Hammatt Avenue/Campbell Boulevard intersection are made, to provide a more conservative analysis. Table 3-11 shows cumulative traffic flow conditions at the intersections analyzed in the traffic study. As indicated in Table 3-11, none of the intersections operate at an acceptable LOS during morning and evening peak hours.
TABLE 3-11
LOS AT STUDY INTERSECTIONS – CUMULATIVE CONDITIONS
Intersection Control
AM Peak Hour PM Peak Hour
Average
Delay (sec.) LOS Average Delay (sec.) LOS
Hammatt Ave./Campbell Blvd.
Eastbound East/west stop 118.7 F 57.5 F
Westbound >300 F >300 F
Hammatt Ave./SR 99 NB Ramps All-way stop 118.5 F 109.4 F Hammatt Ave./SR 99 SB Ramps All-way stop 87.3 F 56.6 F
Hammatt Ave./F Street All-way stop 43.3 E 60.5 F
Notes: Bold values indicate unacceptable City LOS (D, E or F).
Source: KD Anderson and Associates 2020.
Livingston Truck Stop Complex IS/MND 3-67 December 2020 Cumulative Plus Project-Phase 1
Table 3-12 shows estimated traffic operations under Cumulative Plus Project-Phase 1 conditions, with a more detailed analysis shown in the traffic study in Appendix D. As shown in Table 3-12, none of the intersections operate at an acceptable LOS during morning and evening peak hours.
TABLE 3-12
LOS AT STUDY INTERSECTIONS – CUMULATIVE PLUS PROJECT
PHASE 1 CONDITIONS
Intersection Control
AM Peak Hour PM Peak Hour
Average
Delay (sec.) LOS Average Delay (sec.) LOS
Hammatt Ave./Campbell Blvd.
Eastbound East/west stop >300 F 137.3 F
Westbound >300 F >300 F
Hammatt Ave./SR 99 NB Ramps All-way stop 188.0 F 171.7 F Hammatt Ave./SR 99 SB Ramps All-way stop 103.1 F 69.9 F Hammatt Ave./F Street All-way stop 54.8 F 70.6 F
Notes: Bold values indicate unacceptable City LOS (D, E or F).
Source: KD Anderson and Associates 2020.
With Phase 1, the addition of project-generated automobile and truck traffic onto the adjacent street system with background cumulative traffic would exacerbate conditions at all four intersections. This is an important traffic impact but not a significant effect under CEQA as discussed above. In addition to the transportation improvements described in Section 3.17, Transportation, improvements presented below would ensure that cumulative traffic conditions are consistent with City standards at the deficient intersections.
Mitigation Measures:
CUMUL-1: The project applicant or successors in interest shall be required to pay fair-share costs of improvements at the Hammatt Avenue/Campbell Boulevard intersection as described in Mitigation Measures TRANS1 and TRANS-3, along with an addition of a westbound left-turn lane on Campbell Boulevard east of Hammatt Avenue, a conversion of the southbound right-turn lane to a through/right-turn lane, and the addition of a northbound-to-eastbound overlap phase.
CUMUL-2: The project applicant or successors in interest shall be required to pay fair-share costs of traffic signals or roundabouts at the Hammatt Avenue intersections with the SR 99 northbound ramps and the SR 99 Livingston Truck Stop Complex IS/MND 3-68 December 2020 southbound ramps as described in Mitigation Measure TRANS-2, along with the construction of a southbound right-turn lane on Hammett Avenue that extends to Campbell Boulevard.
CUMUL-3: The project applicant or successors in interest shall be required to pay fair-share costs of a traffic signal at the Hammatt Avenue/F Street intersections.
Cumulative Plus Project-Buildout
Table 3-13 shows estimated traffic operations under Cumulative Plus Project-Buildout conditions, with a more detailed analysis shown in the traffic study in Appendix D. As shown in Table 3-13, the resulting LOS at the intersections are the same as those under Phase 1 conditions.
TABLE 3-13
LOS AT STUDY INTERSECTIONS – CUMULATIVE PLUS PROJECT
BUILDOUT CONDITIONS
Intersection Control
AM Peak Hour PM Peak Hour
Average
Delay (sec.) LOS Average Delay (sec.) LOS
Hammatt Ave./Campbell Blvd.
Eastbound East/west stop >300 F 193.8 F
Westbound >300 F >300 F
Hammatt Ave./SR 99 NB Ramps All-way stop 236.2 F 205.0 F Hammatt Ave./SR 99 SB Ramps All-way stop 114.3 F 78.2 F Hammatt Ave./F Street All-way stop 61.0 F 74.2 F
Notes: Bold values indicate unacceptable City LOS (D, E or F).
Source: KD Anderson and Associates 2020.
With buildout, the addition of project-generated automobile and truck traffic onto the adjacent street system with background cumulative traffic would exacerbate conditions at all four intersections. This is an important traffic impact, but not a significant effect under CEQA as discussed above. Transportation improvements CUMUL-1 through CUMUL-3, described above, would ensure that cumulative traffic conditions are consistent with City standards at the deficient intersections.
Ramp Junctions
As indicated in the evaluation of ramp terminal LOS under Existing Plus Project conditions, the planned widening of SR 99 to six lanes would improve conditions at the SR Livingston Truck Stop Complex IS/MND 3-69 December 2020 99/Hammatt Avenue ramp junctions. No further analysis of ramp merge – diverge under cumulative conditions is necessary.
Intersection Queues
The traffic study notes that, if background development occurs and no improvements are made, then the southbound through traffic queues on Hammatt Avenue at the SR 99 NB ramps would extend beyond the Campbell Boulevard intersection. If the project is built out, then this queue would be longer, and the northbound queue would extend through the SB ramps intersection to F Street if no improvements are made. The transportation improvements needed to address LOS deficiencies would also deal with this issue. No additional improvements would be required.
However, under cumulative conditions at project buildout, the 95th percentile queue extending back on Campbell Boulevard from Hammatt Avenue is projected to extend beyond the proposed western driveway on the project site, and a safety impact may be created. The traffic study suggests two alternatives for dealing with this issue, either of which the project may choose to implementation. Implementation of either alternative would reduce safety impacts related to the western driveway under cumulative conditions to a level that would be less than significant.
Mitigation Measures:
CUMUL-4: The project applicant or successors in interest shall select and implement one of two alternatives related to traffic queuing at the western driveway:
1) Reconfiguration of the westbound Campbell Boulevard approach to allow left turns from two lanes. This change would equalize traffic volumes in each lane and reduce the queue lengths. This would require that the layout of the Hammatt Avenue/Campbell Boulevard intersection be wider to accommodate the concurrent turning paths of two STAA trucks. The project applicant or successors in interest shall be required to pay fair-share costs of improvements proposed by this alternative.
2) Left turns at the western driveway shall be prohibited. If determined to be needed by the City, the project proponents shall fund construction of a median treatment or other measure acceptable to the City to prohibit left turns.
c) Findings on Adverse Effects on Human Beings.
Potential adverse effects on human beings were discussed in Section 3.3, Air Quality; Section 3.7, Geology and Soils (seismic hazards); Section 3.9, Hazards and Hazardous Materials; Section 3.10, Hydrology and Water Quality (flooding); Section 3.17, Transportation (traffic hazards), and Section 3.20, Wildfire. Potential adverse effects on human beings were identified in those sections, but these effects would be reduced to levels that are considered less than significant through compliance with applicable laws, Livingston Truck Stop Complex IS/MND 3-70 December 2020 regulations, and City ordinances and standards, along with mitigation measures described in this IS/MND that would reduce potential traffic safety impacts. No other potential adverse effects on human beings have been identified.
Livingston Truck Stop Complex IS/MND 4-1 December 2020
4.0 REFERENCES
4.1 DOCUMENT PREPARERS
This IS/MND was prepared by BaseCamp Environmental, Inc. for use by and under the supervision of the City of Livingston Community Development Department. The following persons were involved in preparation of the IS/MND:
City of Livingston Community Development Department
Randy Hatch, Contract City Planner
BaseCamp Environmental, Inc.
Charlie Simpson, Principal
Terry Farmer, AICP, Senior Environmental Planner
Krista Simpson, Graphic Artist
4.2 DOCUMENTS CITED
California Air Resources Board (ARB). 2008. Climate Change Scoping Plan: A Framework for Change. Adopted December 2008.
______. 2014. First Update to the Climate Change Scoping Plan: Building on the Framework. May 2014.
______. 2017. California’s 2017 Climate Change Scoping Plan. November 2017. ______. 2019. California Greenhouse Gas Emissions for 2000 to 2017.
California Climate Action Team. 2010. Climate Action Team Biennial Report – Executive Summary. April 2010.
California Department of Conservation, Division of Land Resources Protection, Farmland Mapping and Monitoring Program (FMMP). 2016. Merced County Important Farmland 2016, Sheet 1 of 2 (map).
California Department of Conservation, Division of Oil, Gas and Geothermal Resources (DOGGR). 2001. Oil, Gas, and Geothermal Fields in California 2001. Map S-1.
California Department of Finance. 2020. Report E-5, Population and Housing Estimates for Cities, Counties, and the State, January 1, 2011-2020, with 2010 Benchmark.
Released May 1, 2020.
California Department of Forestry and Fire Protection (Cal Fire). 2007a. Draft Fire Hazard Severity Zones in LRA, Merced County (map). September 21, 2007.
Livingston Truck Stop Complex IS/MND 4-2 December 2020
______. 2007b. Draft Fire Hazard Severity Zones in SRA, Merced County (map).
Adopted on November 7, 2007.
California Department of Resources, Recycling, and Recovery (CalRecycle). 2018a.
Facility/Site Summary Details: Billy Wright Disposal Site. Available online at http://www.calrecycle.ca.gov/SWFacilities/Directory/24-AA-0002/Detail/.
Accessed September 23, 2018.
______. 2018b. Facility/Site Summary Details: Highway 59 Disposal Site. Available at http://www.calrecycle.ca.gov/SWFacilities/Directory/24-AA-0001/Detail/.
Accessed September 23, 2018.
California Department of Toxic Substances Control (DTSC). 2020. EnviroStor database.
Available online at www.envirostor.dtsc.ca.gov. Accessed April 21, 2020.
California Department of Transportation (Caltrans). 2018. List of Officially Designated State Scenic Highways. Available online at http://www.dot.ca.gov/hq/LandArch/ 16_livability/scenic_highways/scenic_hwy.htm. Accessed September 23, 2018.
California Department of Water Resources (DWR). 2004. California’s Groundwater.
DWR Bulletin 118 – San Joaquin Valley Groundwater Basin, Merced Subbasin.
February 2004.
California Energy Commission (CEC). 2018a. Electricity Consumption by County – Merced County. Available online at ecdms.energy.ca.gov/elecbycounty.aspx.
Accessed November 13, 2019.
______. 2018b. Gas Consumption by County – Merced County. Available online at ecdms.energy.ca.gov/gasbycounty.aspx. Accessed November 13, 2019.
California Environmental Protection Agency (CalEPA). 2016a. Sites Identified with Waste Constituents Above Hazardous Waste Levels Outside the Waste Management Unit. Available online at http://www.calepa.ca.gov/SiteCleanup/ CorteseList/CurrentList.pdf. Accessed September 23, 2018. ______. 2016b. List of "Active" CDO and CAO from Water Board. Available online at http://www.calepa.ca.gov/SiteCleanup/CorteseList/default.htm. Accessed September 23, 2018.
California Geological Survey. 2015. CGS Information Warehouse: Regulatory Maps.
Available online at http://maps.conservation.ca.gov/cgs/informationwarehouse/ index.html?map=regulatorymaps. Accessed September 22, 2018.
California High Speed Rail Authority. 2012. Paleontological Resource Report – Addendum, Fresno to Bakersfield Section Hanford West Bypass. Prepared by PaleoResource Consultants. July 2012.
California Office of Environmental Health Hazard Assessment (OEHHA). 2020.
CalEnviroScreen 3.0. Available online at oehha.ca.gov/calenviroscreen/report/ calenviroscreen-30. Accessed June 18, 2020.
Livingston Truck Stop Complex IS/MND 4-3 December 2020
City of Livingston. 1992a. City of Livingston Sewer Collection System Study and Master Plan. Prepared by Lew-Garcia-Davis. September 1992.
______. 1992b. City of Livingston Water Distribution System Study and Master Plan.
Prepared by Lew-Garcia-Davis. September 1992.
______. 1999a. Livingston General Plan. Adopted December 1999. ______. 1999b. Final Environmental Impact Report, Livingston General Plan Update.
SCH No. 99042020. November 1999.
______. 2007. Storm Water Management Program for the City of Livingston. February 2007.
______. 2016. City of Livingston Urban Water Management Plan. Prepared by AM Consulting Engineers, Inc. August 2016.
______. 2018a. Annual Water Quality Report, Reporting Year 2018. ______. 2018b. City of Livingston Municipal Service Review Update, Draft Report.
Prepared by Economic and Planning Systems, Inc. February 2018.
EdData. 2020. Census Day Enrollment. Available online at ed-data.org/school/Merced/.
Accessed March 6, 2020.
Federal Emergency Management Agency. 2008. Flood Insurance Rate Map (FEMA #06047C0200G). Merced County, California. Revised December 2, 2008.
Fimrite, Peter. 1996. “Infamous Blood Alley to Disappear/New Bypass around Highway 99 Stoplight.” SF Gate, November 4, 1996.
Governor’s Office of Planning and Research (OPR). 2018. Technical Advisory on Evaluating Transportation Impacts in CEQA. December 2018.
Merced County. 2012. 2030 Merced County General Plan Update Draft Program Environmental Impact Report. November 2012.
______. 2013. 2030 Merced County General Plan. December 10, 2013.
Merced County Association of Governments (MCAG). 2018a. Regional Transportation Plan/Sustainable Communities Strategy for Merced County. ______. 2018b. Draft Program Environmental Impact Report for the MCAG 2018 Regional Transportation Plan/Sustainable Communities Strategy. May 2018.
Merced County Local Agency Formation Commission (LAFCo). 2018. City of Livingston Municipal Service Review Update. Prepared by Economic & Planning Systems, Inc. February 2018.
Livingston Truck Stop Complex IS/MND 4-4 December 2020
Merced Sustainable Groundwater Management Agency (SGMA). 2019. Merced Groundwater Subbasin Groundwater Sustainability Plan. Prepared by Woodard and Curran. November 2019.
RMC Water and Environment. 2013. Merced Integrated Regional Water Management Plan. August 2013.
San Joaquin Valley Air Pollution Control District. 2009. Final Staff Report – Climate Change Action Plan: Addressing Greenhouse Gas Emissions Impact under the California Environmental Quality Act. December 17, 2009. ______. 2015. Guide for Assessing and Mitigating Air Quality Impacts (GAMAQI).
Adopted March 19, 2015.
______. 2020. Ambient Air Quality Standards and Valley Attainment Status. Available online at valleyair.org/aqinfo/attainment.htm. Accessed April 3, 2020.
State Water Resources Control Board. 2020. GeoTracker database. Available online at www.geotracker.swrcb.ca.gov. Accessed April 21, 2020.
U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS). 2020.
Custom Soil Resource Report for Merced Area, California. April 21, 2020.
U.S. Department of Agriculture, Soil Conservation Service (SCS). 1962. Soil Survey, Merced Area, California. Issued July 1962.
U.S. Energy Information Administration (EIA). 2016. 2012 Commercial Buildings Energy Consumption Survey. Available online at https://www.eia.gov/ consumption/commercial/. Released December 2016.
U.S. Environmental Protection Agency (EPA). 2009. Endangerment and Cause of Contribute Findings for Greenhouse Gases Under Section 202(a) of the Clean Air Act. Federal Register Vol. 74, No. 239, pp. 66496-66546. December 15, 2009.
Wagner, D. L., E. J. Bortugno, and R. D. McJunkin. 1991. Geologic Map of the San Francisco-San Jose Quadrangle, California, 1:250,000. California Division of Mines and Geology, Regional Geologic Map Series.
4.3 PERSONS CONSULTED
Baraka Carter, Battalion Chief, Cal Fire/Merced County Fire Department Randy Hatch, Contract Planner, Livingston Community Development Department Chris Soria, Chief, Livingston Police Department
Livingston Truck Stop Complex IS/MND 5-1 December 2020
5.0 NOTES RELATED TO EVALUATION OF
ENVIRONMENTAL IMPACTS
The following notes are included in the Environmental Information Checklist shown in Appendix G of the State CEQA guidelines. The notes provide guidance as to the proper use of the form.
1) A brief explanation is required for all answers except “No Impact” answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A “No Impact” answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A “No Impact” answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis). 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.
3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. “Potentially Significant Impact” is appropriate if there is substantial evidence that an effect may be significant. If there are one or more “Potentially Significant Impact” entries when the determination is made, an EIR is required. 4) “Negative Declaration: Less Than Significant with Mitigation Incorporated” applies where the incorporation of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.” The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from “Earlier Analyses,” as described in (5) below, may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration [CEQA Guidelines Section 15063(c)(3)(D)]. In this case, a brief discussion should identify the following:
a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed: Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis.
Livingston Truck Stop Complex IS/MND 5-2 December 2020
c) Mitigation Measures: For effects that are “Less than Significant with Mitigation Incorporated,” describe the mitigation measures, which ones were incorporated or refined from the earlier document, and the extent to which they address site-specific conditions for the project.
6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances).
Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project’s environmental effects in whatever format is selected. 9) The explanation of each issue should identify:
a) the significance criteria or threshold, if any, used to evaluate each question; and
b) the mitigation measure identified, if any, to reduce the impact to less than significance.
APPENDIX A
AIR QUALITY MODELING RESULTS
Construction Phase - No demolition
Consumer Products - Updating of ARB factor in CalEEMod.
Fleet Mix -
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Fast Food Restaurant w/o Drive Thru 2.63 1000sqft 0.06 2,625.00 0 Fast Food Restaurant with Drive Thru 9.00 1000sqft 0.21 9,004.00 0 Automobile Care Center 4.20 1000sqft 0.10 4,200.00 0
Convenience Market With Gas Pumps 9.57 1000sqft 0.22 9,570.00 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
3 Wind Speed (m/s) 2.2 Precipitation Freq (Days) 49
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Pacific Gas & Electric Company
Operational Year 2024
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity 0.029
(lb/MWhr)
N2O Intensity 0.006
(lb/MWhr)
Livingston Truck Stop
Merced County, Annual
CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
.
I I I I • I I I • I I I
------------------------------~-------------------------------1---------------l------------------i--------------- • I I I • I I I ------------------------------~-------------------------------1---------------I------------------~--------------- ' I • I I I ------------------------------,1,--------------------------------I----------------~-----------------~--------------- . .
2.0 Emissions Summary
Table Name Column Name Default Value New Value
tblAreaMitigation UseLowVOCPaintNonresidentialExteriorV alue
150 0
tblAreaMitigation UseLowVOCPaintNonresidentialInteriorV alue
150 0
tblAreaMitigation UseLowVOCPaintResidentialExteriorValu e
150 0
tblAreaMitigation UseLowVOCPaintResidentialInteriorValue 150 0 tblConstructionPhase NumDays 5.00 10.00
tblConstructionPhase NumDays 100.00 210.00
tblConstructionPhase NumDays 10.00 0.00
tblConstructionPhase NumDays 2.00 5.00
tblConstructionPhase NumDays 1.00 10.00
tblConsumerProducts ROG_EF 2.14E-05 7.5E-06
tblLandUse LandUseSquareFeet 2,630.00 2,625.00
tblLandUse LandUseSquareFeet 9,000.00 9,004.00
tblOffRoadEquipment HorsePower 231.00 226.00
tblOffRoadEquipment HorsePower 187.00 174.00
tblOffRoadEquipment HorsePower 130.00 125.00
tblOffRoadEquipment HorsePower 247.00 255.00
tblOffRoadEquipment HorsePower 247.00 255.00
CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I I I
-----------------------------+- -----------------------------1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - ► -------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - +- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - ►- ------------------------- -----------------------------+-----------------------------+------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------t-------------------------- • • I • • I -----------------------------~------------------------------s------------------------------~--------------------------
2.1 Overall Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2021 0.1262 0.6743 0.6197 1.0600e0030.0194 0.0361 0.0556 3.3700e0030.0333 0.0367 0.0000 93.2821 93.2821 0.0262 0.0000 93.9361 2022 0.0252 0.2561 0.2575 4.5000e0043.3900e0030.0128 0.0162 9.2000e0040.0118 0.0127 0.0000 40.1569 40.1569 0.0115 0.0000 40.4450 Maximum 0.1262 0.6743 0.6197 1.0600e0030.0194 0.0361 0.0556 3.3700e0030.0333 0.0367 0.0000 93.2821 93.2821 0.0262 0.0000 93.9361 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2021 0.1262 0.6743 0.6197 1.0600e0030.0130 0.0361 0.0491 2.6700e0030.0333 0.0360 0.0000 93.2820 93.2820 0.0262 0.0000 93.9360 2022 0.0252 0.2561 0.2575 4.5000e0043.3900e0030.0128 0.0162 9.2000e0040.0118 0.0127 0.0000 40.1569 40.1569 0.0115 0.0000 40.4450 Maximum 0.1262 0.6743 0.6197 1.0600e0030.0130 0.0361 0.0491 2.6700e0030.0333 0.0360 0.0000 93.2820 93.2820 0.0262 0.0000 93.9360 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 28.13 0.00 8.93 16.32 0.00 1.42 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Page 3 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I
I I I I I I I I I I I ' I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------T-------•••••••••-------,-------,-------,-------T••••••• .,
.,
I
I
I
'
I
I
I I I I I I I I I I I I I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------T-------••••••••1-------,-------,-------,-------T••••••• •• I •• I I I
I I I I I I I I I I I I I I I I I
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.0407 0.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004 Energy 0.0142 0.1293 0.1086 7.8000e0049.8200e0039.8200e0039.8200e0039.8200e0030.0000 272.1939 272.1939 8.6400e0033.8100e003273.5453 Mobile 2.8304 10.9607 19.6543 0.0596 4.3595 0.0489 4.4084 1.1678 0.0456 1.2134 0.0000 5,484.768 6 5,484.768
6 0.4654 0.0000 5,496.404
7 Waste 0.0000 0.0000 0.0000 0.0000 36.2867 0.0000 36.2867 2.1445 0.0000 89.8987 Water 0.0000 0.0000 0.0000 0.0000 1.4702 8.2130 9.6832 0.1514 3.6400e00314.5530 Total 2.8853 11.0899 19.7631 0.0604 4.3595 0.0587 4.4182 1.1678 0.0554 1.2232 37.7569 5,765.176 0 5,802.932
9 2.7699 7.4500e0035,874.402
2 Unmitigated Operational
Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 6-1-2021 8-31-2021 0.3109 0.3109
2 9-1-2021 11-30-2021 0.3862 0.3862
3 12-1-2021 2-28-2022 0.2740 0.2740
4 3-1-2022 5-31-2022 0.1107 0.1107
Highest 0.3862 0.3862
CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I I I I I I I I I I I I I ' I I I I I -------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------•········-------~-------~-------~-------~------- 1 I I I I I I I I I I I ' ' I I I I I -------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------•········-------~-------~-------~-------~------- 1 I I I I I I I I I I I ' ' I I I I I -------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------•········-------~-------~-------~-------~------- 1 I I I I I I I I I I I ' ' I I I I I -------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------•········-------~-------~-------~-------~------- 1 I - i -
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.0407 0.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004 Energy 0.0142 0.1293 0.1086 7.8000e0049.8200e0039.8200e0039.8200e0039.8200e0030.0000 272.1939 272.1939 8.6400e0033.8100e003273.5453 Mobile 2.7418 10.4700 17.6327 0.0511 3.5421 0.0421 3.5842 0.9489 0.0392 0.9881 0.0000 4,706.164 0 4,706.164
0 0.4419 0.0000 4,717.2114
Waste 0.0000 0.0000 0.0000 0.0000 9.0717 0.0000 9.0717 0.5361 0.0000 22.4747 Water 0.0000 0.0000 0.0000 0.0000 1.1762 6.5704 7.7466 0.1211 2.9100e00311.6424 Total 2.7967 10.5993 17.7415 0.0519 3.5421 0.0519 3.5940 0.9489 0.0490 0.9979 10.2478 4,984.928 8 4,995.176
6 1.1078 6.7200e0035,024.874
2 Mitigated Operational
3.0 Construction Detail
Construction Phase
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
3.07 4.42 10.23 14.06 18.75 11.56 18.65 18.75 11.45 18.42 72.86 13.53 13.92 60.01 9.80 14.46 CalEEMod Version: CalEEMod.2016.3.2 Page 5 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I
I I I I I I I I I I I ' I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• I I
I I I I I I I I I I I ' I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• I I
I I I I I I I I I I I ' I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• I I
I I I I I I I I I I I ' I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• I I
I
I
I I I I I I I I I I I I I I I I
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Demolition Demolition 6/1/2021 5/31/2021 5 0
2 Site Preparation Site Preparation 6/15/2021 6/28/2021 5 10 3 Grading Grading 6/16/2021 6/22/2021 5 5
4 Building Construction Building Construction 6/18/2021 4/7/2022 5 210 5 Paving Paving 11/5/2021 11/11/2021 5 5
6 Architectural Coating Architectural Coating 11/12/2021 11/25/2021 5 10 OffRoad Equipment
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 38,099; Non-Residential Outdoor: 12,700; Striped Parking Area: 0 (Architectural Coating ±sqft)
Acres of Grading (Site Preparation Phase): 18
Acres of Grading (Grading Phase): 4
Acres of Paving: 0
CalEEMod Version: CalEEMod.2016.3.2 Page 6 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
■ ■ I -------1------------------------:-----------------------l------------~------------4--------~--------4------------------------- • ■ 1 I I I I ■ ■ 1 I I I I
-------1------------------------:-----------------------l------------~------------4--------~--------4------------------------- • ■ 1 I I I I ■ ■ 1 I I I I
-------1------------------------:-----------------------l------------~------------4--------~--------4------------------------- • ■ 1 I I I I ■ ■ 1 I I I I
-------1------------------------:-----------------------l------------~------------4--------~--------4------------------------- • ■ 1 I I I I ■ ■ 1 I I I I
-------l------------------------~----------------------4-------------1-------------I---------~--------~------------------------- Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Architectural Coating Air Compressors 1 6.00 78 0.48
Paving Cement and Mortar Mixers 4 6.00 9 0.56
Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Grading Concrete/Industrial Saws 1 8.00 81 0.73
Building Construction Cranes 1 4.00 226 0.29
Building Construction Forklifts 2 6.00 89 0.20
Site Preparation Graders 1 8.00 174 0.41
Paving Pavers 1 7.00 125 0.42
Paving Rollers 1 7.00 80 0.38
Demolition Rubber Tired Dozers 1 1.00 255 0.40
Grading Rubber Tired Dozers 1 1.00 255 0.40
Building Construction Tractors/Loaders/Backhoes 2 8.00 97 0.37 Demolition Tractors/Loaders/Backhoes 2 6.00 97 0.37
Grading Tractors/Loaders/Backhoes 2 6.00 97 0.37
Paving Tractors/Loaders/Backhoes 1 7.00 97 0.37
Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37 Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Architectural Coating 1 2.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 5 9.00 4.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Demolition 4 10.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 4 10.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Site Preparation 2 5.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Page 7 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I I
I
I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
----------------------------:---------------------------~---------------- I I
I
-------------1---------T-------------- 1
I
------------ :1---------T••••••••••••••
I
I
------------ •1---------T••••••••••••••
I
I
------------ .1---------T••••••••••••••
I
I
-------------1---------T-------------- 1
I
------------ :1---------T••••••••••••••
I
I
------------ •1---------T••••••••••••••
I
I
------------ .1---------T••••••••••••••
I
I
-------------1---------T-------------- 1
I
------------ :1---------T••••••••••••••
I
I
------------ •1---------T••••••••••••••
I
I
------------ .1---------T••••••••••••••
I
I
-------------1---------T-------------- 1 I
I I
............................ :---------------------------~---------------- ------------ :1---------T•••••••••••••• I I I I I
----------------------------~---------------------------1------------------ ~ ------------1---------------~-------------- • I I I I I I I I I • I I I I I I I I I
----------------:---------------~----------1----------~----------l-----------t----------~----------1--------------1----------~---------- • I I I I I I I I I • I I I I I I I I I ----------------:---------------~----------1----------~----------l-----------t----------~----------1--------------1----------~---------- • I I I I I I I I I • I I I I I I I I I
----------------:---------------~----------l----------~----------l-----------t----------~----------1--------------1----------~---------- • I I I I I I I I I • I I I I I I I I I
----------------:---------------~----------l----------~----------l-----------t----------~----------1--------------1----------~---------- • I I I I I I I I I • I I I I I I I I I
----------------~---------------1-----------~---------+---------~-----------I-----------~---------~-------------~---------➔----------
3.2 Demolition - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction On-Site
3.1 Mitigation Measures Construction
Water Exposed Area
Reduce Vehicle Speed on Unpaved Roads
CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
., I I I I I I I I I ' ' I I I I
.. I I I I I I I I I ' ' I I I I
.. I I I I I I I I I I ' I I I I
.. I I I I I I I I I I ' I I I I
3.2 Demolition - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 9 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I I I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• --
I
I I I
3.2 Demolition - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off-Site
3.3 Site Preparation - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 9.5400e0030.0000 9.5400e0031.0300e0030.0000 1.0300e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.1200e0030.0399 0.0337 5.0000e0052.2600e0032.2600e0032.0800e0032.0800e0030.0000 4.0959 4.0959 1.3200e0030.0000 4.1290 Total 4.1200e0030.0399 0.0337 5.0000e0059.5400e0032.2600e0030.0118 1.0300e0032.0800e0033.1100e0030.0000 4.0959 4.0959 1.3200e0030.0000 4.1290 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 10 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
' ' ' I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ' ' ' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
' ' ' '
i
' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
' '
3.3 Site Preparation - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Total 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 4.3000e0030.0000 4.3000e0034.6000e0040.0000 4.6000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.1200e0030.0399 0.0337 5.0000e0052.2600e0032.2600e0032.0800e0032.0800e0030.0000 4.0959 4.0959 1.3200e0030.0000 4.1290 Total 4.1200e0030.0399 0.0337 5.0000e0054.3000e0032.2600e0036.5600e0034.6000e0042.0800e0032.5400e0030.0000 4.0959 4.0959 1.3200e0030.0000 4.1290 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
' ' ' I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ' ' ' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
' ' ' '
i
' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
' '
3.3 Site Preparation - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Total 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Mitigated Construction Off-Site
3.4 Grading - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 2.1200e0030.0000 2.1200e0032.3000e0040.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.9400e0030.0176 0.0199 3.0000e0059.8000e0049.8000e0049.4000e0049.4000e0040.0000 2.6121 2.6121 4.9000e0040.0000 2.6243 Total 1.9400e0030.0176 0.0199 3.0000e0052.1200e0039.8000e0043.1000e0032.3000e0049.4000e0041.1700e0030.0000 2.6121 2.6121 4.9000e0040.0000 2.6243 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 12 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I
I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I
I I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
I
I
I
'
' I
I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
I
I
3.4 Grading - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Total 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 9.5000e0040.0000 9.5000e0041.0000e0040.0000 1.0000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.9400e0030.0176 0.0199 3.0000e0059.8000e0049.8000e0049.4000e0049.4000e0040.0000 2.6121 2.6121 4.9000e0040.0000 2.6243 Total 1.9400e0030.0176 0.0199 3.0000e0059.5000e0049.8000e0041.9300e0031.0000e0049.4000e0041.0400e0030.0000 2.6121 2.6121 4.9000e0040.0000 2.6243 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I
I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I
I I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
I
I
I
'
' I
I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
I
I
3.4 Grading - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Total 1.0000e0047.0000e0057.6000e0040.0000 2.0000e0040.0000 2.0000e0045.0000e0050.0000 5.0000e0050.0000 0.1761 0.1761 1.0000e0050.0000 0.1763 Mitigated Construction Off-Site
3.5 Building Construction - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0543 0.5592 0.5106 8.0000e0040.0314 0.0314 0.0289 0.0289 0.0000 70.1711 70.1711 0.0227 0.0000 70.7385 Total 0.0543 0.5592 0.5106 8.0000e0040.0314 0.0314 0.0289 0.0289 0.0000 70.1711 70.1711 0.0227 0.0000 70.7385 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I I I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• --
I
I I I
3.5 Building Construction - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 9.9000e0040.0312 6.5200e0038.0000e0051.8700e0031.0000e0041.9600e0035.4000e0049.0000e0056.3000e0040.0000 7.6033 7.6033 7.3000e0040.0000 7.6216 Worker 2.6600e0031.8200e0030.0193 5.0000e0055.0600e0034.0000e0055.1000e0031.3500e0034.0000e0051.3800e0030.0000 4.4700 4.4700 1.4000e0040.0000 4.4734 Total 3.6500e0030.0331 0.0258 1.3000e0046.9300e0031.4000e0047.0600e0031.8900e0031.3000e0042.0100e0030.0000 12.0733 12.0733 8.7000e0040.0000 12.0950 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0543 0.5592 0.5106 8.0000e0040.0314 0.0314 0.0289 0.0289 0.0000 70.1710 70.1710 0.0227 0.0000 70.7384 Total 0.0543 0.5592 0.5106 8.0000e0040.0314 0.0314 0.0289 0.0289 0.0000 70.1710 70.1710 0.0227 0.0000 70.7384 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 15 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I I I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• - I I I I I I I
- I I I I I I I
- I I I I I I I
- I I I I I I I
I I
I I
I I
I I
I I I '
' I
I
I
I
I
I
I
I I I I
I I I I
I I I I
I I I I
3.5 Building Construction - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 9.9000e0040.0312 6.5200e0038.0000e0051.8700e0031.0000e0041.9600e0035.4000e0049.0000e0056.3000e0040.0000 7.6033 7.6033 7.3000e0040.0000 7.6216 Worker 2.6600e0031.8200e0030.0193 5.0000e0055.0600e0034.0000e0055.1000e0031.3500e0034.0000e0051.3800e0030.0000 4.4700 4.4700 1.4000e0040.0000 4.4734 Total 3.6500e0030.0331 0.0258 1.3000e0046.9300e0031.4000e0047.0600e0031.8900e0031.3000e0042.0100e0030.0000 12.0733 12.0733 8.7000e0040.0000 12.0950 Mitigated Construction Off-Site
3.5 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0235 0.2408 0.2461 3.9000e0040.0128 0.0128 0.0118 0.0118 0.0000 34.3617 34.3617 0.0111 0.0000 34.6395 Total 0.0235 0.2408 0.2461 3.9000e0040.0128 0.0128 0.0118 0.0118 0.0000 34.3617 34.3617 0.0111 0.0000 34.6395 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
' ' I I I I I I I I I I ' ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ' ' I I I I I I I I I I ' II I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• --
' ' ' '
3.5 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.5000e0040.0145 2.8800e0034.0000e0059.1000e0044.0000e0059.5000e0042.6000e0044.0000e0053.0000e0040.0000 3.6862 3.6862 3.5000e0040.0000 3.6949 Worker 1.2000e0037.9000e0048.5800e0032.0000e0052.4800e0032.0000e0052.4900e0036.6000e0042.0000e0056.8000e0040.0000 2.1091 2.1091 6.0000e0050.0000 2.1106 Total 1.6500e0030.0153 0.0115 6.0000e0053.3900e0036.0000e0053.4400e0039.2000e0046.0000e0059.8000e0040.0000 5.7953 5.7953 4.1000e0040.0000 5.8055 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0235 0.2408 0.2461 3.9000e0040.0128 0.0128 0.0118 0.0118 0.0000 34.3616 34.3616 0.0111 0.0000 34.6395 Total 0.0235 0.2408 0.2461 3.9000e0040.0128 0.0128 0.0118 0.0118 0.0000 34.3616 34.3616 0.0111 0.0000 34.6395 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 17 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
' ' I I I I I I I I I I ' ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ' ' I I I I I I I I I I ' II I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• --
' ' ' '
3.5 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.5000e0040.0145 2.8800e0034.0000e0059.1000e0044.0000e0059.5000e0042.6000e0044.0000e0053.0000e0040.0000 3.6862 3.6862 3.5000e0040.0000 3.6949 Worker 1.2000e0037.9000e0048.5800e0032.0000e0052.4800e0032.0000e0052.4900e0036.6000e0042.0000e0056.8000e0040.0000 2.1091 2.1091 6.0000e0050.0000 2.1106 Total 1.6500e0030.0153 0.0115 6.0000e0053.3900e0036.0000e0053.4400e0039.2000e0046.0000e0059.8000e0040.0000 5.7953 5.7953 4.1000e0040.0000 5.8055 Mitigated Construction Off-Site
3.6 Paving - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 1.7800e0030.0166 0.0175 3.0000e0058.7000e0048.7000e0048.1000e0048.1000e0040.0000 2.3134 2.3134 6.7000e0040.0000 2.3302 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7800e0030.0166 0.0175 3.0000e0058.7000e0048.7000e0048.1000e0048.1000e0040.0000 2.3134 2.3134 6.7000e0040.0000 2.3302 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 18 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
' ' ' I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ' ' ' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
' ' ' '
i
' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
' '
3.6 Paving - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.9000e0041.3000e0041.3700e0030.0000 3.6000e0040.0000 3.6000e0041.0000e0040.0000 1.0000e0040.0000 0.3170 0.3170 1.0000e0050.0000 0.3173 Total 1.9000e0041.3000e0041.3700e0030.0000 3.6000e0040.0000 3.6000e0041.0000e0040.0000 1.0000e0040.0000 0.3170 0.3170 1.0000e0050.0000 0.3173 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 1.7800e0030.0166 0.0175 3.0000e0058.7000e0048.7000e0048.1000e0048.1000e0040.0000 2.3134 2.3134 6.7000e0040.0000 2.3302 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7800e0030.0166 0.0175 3.0000e0058.7000e0048.7000e0048.1000e0048.1000e0040.0000 2.3134 2.3134 6.7000e0040.0000 2.3302 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 19 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
' ' ' I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ' ' ' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
' ' ' '
i
' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
' '
3.6 Paving - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.9000e0041.3000e0041.3700e0030.0000 3.6000e0040.0000 3.6000e0041.0000e0040.0000 1.0000e0040.0000 0.3170 0.3170 1.0000e0050.0000 0.3173 Total 1.9000e0041.3000e0041.3700e0030.0000 3.6000e0040.0000 3.6000e0041.0000e0040.0000 1.0000e0040.0000 0.3170 0.3170 1.0000e0050.0000 0.3173 Mitigated Construction Off-Site
3.7 Architectural Coating - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.0589 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0900e0037.6300e0039.0900e0031.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 1.2766 1.2766 9.0000e0050.0000 1.2788 Total 0.0600 7.6300e0039.0900e0031.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 1.2766 1.2766 9.0000e0050.0000 1.2788 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 20 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I
I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I
I I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
I
I
I
'
i
I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
I
I
3.7 Architectural Coating - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.0000e0053.0000e0053.0000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0705 0.0705 0.0000 0.0000 0.0705 Total 4.0000e0053.0000e0053.0000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0705 0.0705 0.0000 0.0000 0.0705 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.0589 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.0900e0037.6300e0039.0900e0031.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 1.2766 1.2766 9.0000e0050.0000 1.2788 Total 0.0600 7.6300e0039.0900e0031.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 1.2766 1.2766 9.0000e0050.0000 1.2788 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 21 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
' ' ' I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ' ' ' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• ..
..
' ' ' '
i
' I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------••••••••·-------,-------,-------,-------T••••••• :: i
' '
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
Improve Destination Accessibility
Improve Pedestrian Network
3.7 Architectural Coating - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.0000e0053.0000e0053.0000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0705 0.0705 0.0000 0.0000 0.0705 Total 4.0000e0053.0000e0053.0000e0040.0000 8.0000e0050.0000 8.0000e0052.0000e0050.0000 2.0000e0050.0000 0.0705 0.0705 0.0000 0.0000 0.0705 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 22 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I I I I I I I I I I I I I I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I I I I I I I I I I I I ' I I I I I •••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------•••••••••-------,-------,-------,-------T••••••• I I I ' ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 2.7418 10.4700 17.6327 0.0511 3.5421 0.0421 3.5842 0.9489 0.0392 0.9881 0.0000 4,706.164 0 4,706.164
0 0.4419 0.0000 4,717.2114
Unmitigated 2.8304 10.9607 19.6543 0.0596 4.3595 0.0489 4.4084 1.1678 0.0456 1.2134 0.0000 5,484.768 6 5,484.768
6 0.4654 0.0000 5,496.404
7 4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Automobile Care Center 99.62 99.62 49.90 92,167 74,886
Convenience Market With Gas Pumps 6,000.39 8,730.52 6564.45 4,134,422 3,359,218 Fast Food Restaurant w/o Drive Thru 1,883.08 1,830.48 1315.00 2,893,611 2,351,059 Fast Food Restaurant with Drive Thru 4,465.08 6,498.27 4884.48 4,499,195 3,655,596 Total 12,448.17 17,158.89 12,813.82 11,619,395 9,440,759 Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Automobile Care Center 9.50 7.30 7.30 33.00 48.00 19.00 21 51 28 Convenience Market With Gas
Pumps
9.50 7.30 15.00 0.80 80.20 19.00 14 21 65
Fast Food Restaurant w/o Drive
Thru
9.50 7.30 7.30 1.50 79.50 19.00 51 37 12
Fast Food Restaurant with Drive
Thru
9.50 7.30 7.30 2.20 78.80 19.00 29 21 50
4.4 Fleet Mix
CalEEMod Version: CalEEMod.2016.3.2 Page 23 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I I
-----------.r--------,--------,--------,--------,--------,--------,--------,--------,--------,--------· -------~-------,--------,--------,--------,, ------- .. ..
..
..
I I
I I ■ ■
····································~--------------~-----------t-----------4------------------------1-------------------------- • I I • • ····································~--------------~-----------t-----------4------------------------1-------------------------- • I I • • ····································~--------------~-----------t-----------4------------------------1-------------------------- : I I • • I I
I I I I I I
i I I ■ I I ■■■■■■■■■■■■■■■■■■■■■■■r----------~---------T••••••••••T--------~•••••••••r•••••••••••••••••••••••••••••••••••••••••••••••••••• I I I ■ I I ■ ■ ■
I I ■ I I ■■■■■■■■■■■■■■■■■■■■■■■r----------~---------T••••••••••T--------~•••••••••r•••••••••••••••••••••••r••••••••••r••••••••••••••••• I
•
I
I I •
■
I
I
I
I •••
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■• • • • • • • • • • • 'P • • • • • • • • • T • • • • • • • • • • "'W' • • • • • • • • -,. • • • • • • • • •r • • • • • • • • • • • r • • • • • • • • • • • r • • • • • • • • • • r • • • • • • • • • • • • • • • • •
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Electricity
Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 131.4721 131.4721 5.9400e0031.2300e003131.9872 Electricity
Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 131.4721 131.4721 5.9400e0031.2300e003131.9872 NaturalGas
Mitigated
0.0142 0.1293 0.1086 7.8000e0049.8200e0039.8200e0039.8200e0039.8200e0030.0000 140.7218 140.7218 2.7000e0032.5800e003141.5581 NaturalGas
Unmitigated
0.0142 0.1293 0.1086 7.8000e0049.8200e0039.8200e0039.8200e0039.8200e0030.0000 140.7218 140.7218 2.7000e0032.5800e003141.5581
5.1 Mitigation Measures Energy
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Automobile Care Center 0.510644 0.028911 0.156693 0.100614 0.015429 0.004164 0.015358 0.155771 0.002390 0.001975 0.005996 0.001496 0.000559 Convenience Market With Gas
Pumps
0.613679 0.031816 0.154973 0.120992 0.008710 0.018915 0.001300 0.036075 0.002377 0.002347 0.006486 0.001616 0.000714 Fast Food Restaurant w/o Drive
Thru
0.613679 0.031816 0.154973 0.120992 0.008710 0.018915 0.001300 0.036075 0.002377 0.002347 0.006486 0.001616 0.000714 Fast Food Restaurant with Drive
Thru
0.613679 0.031816 0.154973 0.120992 0.008710 0.018915 0.001300 0.036075 0.002377 0.002347 0.006486 0.001616 0.000714 Historical Energy Use: N
CalEEMod Version: CalEEMod.2016.3.2 Page 24 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I I I I I I I I I I I I -----------------------~-------~--------l--------l--------l--------l--------l--------l--------l--------l--------l--------l--------~------- -----------------------+-------~--------1--------1--------1--------1--------1--------1--------1--------1--------1--------1-------- ►------- ' ' -----------------------+-------•--------►--------►--------►--------►--------►--------►--------►--------►--------►--------►--------►-------
I I I I I I I I I I I I I I
I •• I •• I I I I I I I I I I I I I I I I I •••••••••••n-------~-------~-------~-------~-------~-------~-------~-------~-------~-------•••••••••-------~-------~-------~-------~••••••• I •• I •• I I I I I I I I I I I I I I I I I •••••••••••n-------~-------~-------~-------~-------~-------~-------~-------~-------~-------•••••••••-------~-------~-------~-------~••••••• I •• I •• I I I I I I I I I I I I I I I I I .. --.... --. ~----------------.-----------------.--------.-----------------,.-------.--------.--------• .. -... -~-------.--------.--------.--------. ... -... . , .,
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Automobile Care
Center
87654 4.7000e0044.3000e0033.6100e0033.0000e0053.3000e0043.3000e0043.3000e0043.3000e0040.0000 4.6776 4.6776 9.0000e0059.0000e0054.7054 Convenience
Market With Gas
Pumps
102399 5.5000e0045.0200e0034.2200e0033.0000e0053.8000e0043.8000e0043.8000e0043.8000e0040.0000 5.4644 5.4644 1.0000e0041.0000e0045.4969 Fast Food
Restaurant w/o
Drive Thru
552353 2.9800e0030.0271 0.0227 1.6000e0042.0600e0032.0600e0032.0600e0032.0600e0030.0000 29.4756 29.4756 5.6000e0045.4000e00429.6508 Fast Food
Restaurant with
Drive Thru
1.89462e
+006
0.0102 0.0929 0.0780 5.6000e0047.0600e0037.0600e0037.0600e0037.0600e0030.0000 101.1042 101.1042 1.9400e0031.8500e003101.7050 Total 0.0142 0.1293 0.1086 7.8000e0049.8300e0039.8300e0039.8300e0039.8300e0030.0000 140.7218 140.7218 2.6900e0032.5800e003141.5581 Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 25 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
1, I 1, I 1, I - - - - - - - - - - - ,-------..-------T I 11 I ______ T I ______ T I ______ T I ______ T I ______ T I ______ T I ______ T------,--------t I I ' - - - - - - -,-------T I I ______ T I ______ T I ______ "T I - - - - - - - I • • I • I
• I • I
I
-----------1--------· --------•------------------------------ • I • I • I I •• I -----------1--------~·----------1-----1------------1~---------t------------1--------•-------~---------t----------------- .. ..
..
..
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Automobile Care
Center
87654 4.7000e0044.3000e0033.6100e0033.0000e0053.3000e0043.3000e0043.3000e0043.3000e0040.0000 4.6776 4.6776 9.0000e0059.0000e0054.7054 Convenience
Market With Gas
Pumps
102399 5.5000e0045.0200e0034.2200e0033.0000e0053.8000e0043.8000e0043.8000e0043.8000e0040.0000 5.4644 5.4644 1.0000e0041.0000e0045.4969 Fast Food
Restaurant w/o
Drive Thru
552353 2.9800e0030.0271 0.0227 1.6000e0042.0600e0032.0600e0032.0600e0032.0600e0030.0000 29.4756 29.4756 5.6000e0045.4000e00429.6508 Fast Food
Restaurant with
Drive Thru
1.89462e
+006
0.0102 0.0929 0.0780 5.6000e0047.0600e0037.0600e0037.0600e0037.0600e0030.0000 101.1042 101.1042 1.9400e0031.8500e003101.7050 Total 0.0142 0.1293 0.1086 7.8000e0049.8300e0039.8300e0039.8300e0039.8300e0030.0000 140.7218 140.7218 2.6900e0032.5800e003141.5581 Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 26 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
1, I 1, I 1, I - - - - - - - - - - - ,-------..-------T I 11 I ______ T I ______ T I ______ T I ______ T I ______ T I ______ T I ______ T------,--------t I I ' - - - - - - -,-------T I I ______ T I ______ T I ______ "T I - - - - - - - I • • I • I
• I • I
I
-----------1--------· --------•------------------------------ • I • I • I I •• I -----------1--------~·----------1-----1------------1~---------t------------1--------•-------~---------t----------------- .. ..
..
..
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Automobile Care
Center
37044 10.7765 4.9000e0041.0000e00410.8188
Convenience
Market With Gas
Pumps
77995.5 22.6898 1.0300e0032.1000e00422.7787
Fast Food
Restaurant w/o
Drive Thru
76046.3 22.1227 1.0000e0032.1000e00422.2094
Fast Food
Restaurant with
Drive Thru
260846 75.8831 3.4300e0037.1000e00476.1804
Total 131.4721 5.9500e0031.2300e003131.9872
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 27 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
1,
1,
1,
I 11 I I I
-----------,-------..-------T------T------,------- ' .. .. .. ' .. -----------1--------~.. ------1----.------------ .. .. ' .. -----------1--------•----+----+---- .. ➔------- .. ..
..
6.1 Mitigation Measures Area
6.0 Area Detail
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Automobile Care
Center
37044 10.7765 4.9000e0041.0000e00410.8188
Convenience
Market With Gas
Pumps
77995.5 22.6898 1.0300e0032.1000e00422.7787
Fast Food
Restaurant w/o
Drive Thru
76046.3 22.1227 1.0000e0032.1000e00422.2094
Fast Food
Restaurant with
Drive Thru
260846 75.8831 3.4300e0037.1000e00476.1804
Total 131.4721 5.9500e0031.2300e003131.9872
Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 28 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
1,
1,
1,
I 11 I I I
-----------,-------..-------T------T------,------- ' .. .. .. ' .. -----------1--------~.. ------1----.------------ .. .. ' .. -----------1--------•----+----+---- .. ➔------- .. ..
..
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.0407 0.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004 Unmitigated 0.0407 0.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
5.8900e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
0.0348 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.0000e0050.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004 Total 0.0407 0.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004 Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 29 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I I I I I I I I I I I I I I
I I I I I I I I I I ' I I I I I
I I I I I I I I I I ' I I I I I
I I I I I I I I I I I I I I I I
I I I I I I I I I I ' I I I I I
-----------~-------,--------,--------,--------,--------,--------,--------,--------,--------,--------· -------r--------,--------,--------,--------r ------- ., .,
.,
.,
' ' ' I I I I I I I I I I I I I I I I •••••••••••--------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• ' ' ' I I I I I I I I I I I I I I I I •••••••••••--------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• ' ' ' ' Apply Water Conservation Strategy
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
5.8900e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
0.0348 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 2.0000e0050.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004 Total 0.0407 0.0000 2.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.5000e0044.5000e0040.0000 0.0000 4.8000e004 Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 30 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
I
I
I I I I I I I I I I I ' I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• I I
I I I I I I I I I I I ' I I I I I •••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------•••••••••-------,-------,-------,-------T••••••• I I
I
I
Total CO2 CH4 N2O CO2e
Category MT/yr
Mitigated 7.7466 0.1211 2.9100e00311.6424
Unmitigated 9.6832 0.1514 3.6400e00314.5530
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Automobile Care
Center
0.395141 /
0.242183
0.9940 0.0129 3.1000e0041.4098
Convenience
Market With Gas
Pumps
0.708874 /
0.434471
1.7831 0.0232 5.6000e0042.5292
Fast Food
Restaurant w/o
Drive Thru
0.798294 /
0.0509549
1.5618 0.0261 6.3000e0042.4002
Fast Food
Restaurant with
Drive Thru
2.7318 /
0.17437
5.3444 0.0892 2.1400e0038.2137
Total 9.6832 0.1514 3.6400e00314.5530
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 31 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
.,
.,
I I I
I I I I
-----------~-------,--------,--------r ------- .,
.,
I,
I,
,. I 11 I I I
.. - .... - - .. ,-------e.-------T------T-------r · .... - - ' .. .. ..
.. -----------1-------•~----+-------- .. ➔------- ..
..
.. -----------1-------•~----+-------- .. ➔------- ..
..
..
8.1 Mitigation Measures Waste
Institute Recycling and Composting Services
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Automobile Care
Center
0.316113 /
0.193746
0.7952 0.0103 2.5000e0041.1279
Convenience
Market With Gas
Pumps
0.567099 /
0.347577
1.4265 0.0185 4.5000e0042.0234
Fast Food
Restaurant w/o
Drive Thru
0.638635 /
0.0407639
1.2494 0.0209 5.0000e0041.9202
Fast Food
Restaurant with
Drive Thru
2.18544 /
0.139496
4.2755 0.0714 1.7100e0036.5710
Total 7.7466 0.1211 2.9100e00311.6424
Mitigated
8.0 Waste Detail
CalEEMod Version: CalEEMod.2016.3.2 Page 32 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
1,
1,
1,
I 11 I I I
-----------,-------,.-------T------T------,------- ' .. .. .. -----------1-------•~-----1-----1----------- ..
..
..
.. -----------1-------•~-----1-----1----------- ..
..
..
..
Total CO2 CH4 N2O CO2e
MT/yr
Mitigated 9.0717 0.5361 0.0000 22.4747
Unmitigated 36.2867 2.1445 0.0000 89.8987
Category/Year
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Automobile Care
Center
16.04 3.2560 0.1924 0.0000 8.0665
Convenience
Market With Gas
Pumps
28.76 5.8380 0.3450 0.0000 14.4635
Fast Food
Restaurant w/o
Drive Thru
30.29 6.1486 0.3634 0.0000 15.2329
Fast Food
Restaurant with
Drive Thru
103.67 21.0441 1.2437 0.0000 52.1358
Total 36.2867 2.1445 0.0000 89.8987
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 33 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
.,
.,
I I I
I I I I
-----------~-------,--------,--------r ------- .,
.,
I,
I,
,. I 11 I I I
.. - .... - - .. ,-------e.-------T------T-------r · .... - - ' .. .. ..
.. -----------1-------•~----+-------- .. ➔------- ..
..
.. -----------1-------•~----+-------- .. ➔------- ..
..
..
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Automobile Care
Center
4.01 0.8140 0.0481 0.0000 2.0166
Convenience
Market With Gas
Pumps
7.19 1.4595 0.0863 0.0000 3.6159
Fast Food
Restaurant w/o
Drive Thru
7.5725 1.5372 0.0908 0.0000 3.8082
Fast Food
Restaurant with
Drive Thru
25.9175 5.2610 0.3109 0.0000 13.0340
Total 9.0717 0.5361 0.0000 22.4747
Mitigated
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
CalEEMod Version: CalEEMod.2016.3.2 Page 34 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
1,
1,
1,
I 11 I I I
-----------,-------,.-------T------T------,------- ' .. .. .. -----------1-------•~-----1-----1----------- ..
..
..
.. -----------1-------•~-----1-----1----------- ..
..
..
..
11.0 Vegetation
Equipment Type Number
CalEEMod Version: CalEEMod.2016.3.2 Page 35 of 35 Date: 7/22/2020 10:14 AM Livingston Truck Stop - Merced County, Annual
APPENDIX B
BIOLOGICAL RESOURCES REPORTS
Element_Type Scientific_Name Common_Name Element_Code Federal_Status State_Status CDFW_Status CA_Rare_Plant_Rank Quad_Code Quad_Name Data_Status Taxonomic_Sort Animals - Birds Accipiter cooperii Cooper's hawk ABNKC12040 None None WL - 3712046 CRESSEY Unprocessed Animals - Birds - Accipitridae - Accipiter cooperii Animals - Birds Buteo swainsoni Swainson's hawk ABNKC19070 None Threatened - - 3712046 CRESSEY Mapped Animals - Birds - Accipitridae - Buteo swainsoni Animals - Birds Elanus leucurus white-tailed kite ABNKC06010 None None FP - 3712046 CRESSEY Unprocessed Animals - Birds - Accipitridae - Elanus leucurus Animals - Birds Agelaius tricolor tricolored blackbird ABPBXB0020 None Threatened SSC - 3712046 CRESSEY Mapped Animals - Birds - Icteridae - Agelaius tricolor Animals - Fish Entosphenus hubbsi Kern brook lamprey AFBAA02040 None None SSC - 3712046 CRESSEY Unprocessed Animals - Fish - Petromyzontidae - Entosphenus hubbsi Animals - Fish Entosphenus tridentatus Pacific lamprey AFBAA02100 None None SSC - 3712046 CRESSEY Unprocessed Animals - Fish - Petromyzontidae - Entosphenus tridentatus Animals - Fish Oncorhynchus mykiss irideus pop. 11 steelhead - Central Valley DPS AFCHA0209K Threatened None - - 3712046 CRESSEY Mapped Animals - Fish - Salmonidae - Oncorhynchus mykiss irideus pop. 11 Animals - Fish Oncorhynchus tshawytscha pop. 13 chinook salmon - Central Valley fall / late fall-run ESU AFCHA0205N None None SSC - 3712046 CRESSEY Unprocessed Animals - Fish - Salmonidae - Oncorhynchus tshawytscha pop. 13 Animals - Insects Desmocerus californicus dimorphus valley elderberry longhorn beetle IICOL48011 Threatened None - - 3712046 CRESSEY Mapped Animals - Insects - Cerambycidae - Desmocerus californicus dimorphus Animals - Reptiles Gambelia sila blunt-nosed leopard lizard ARACF07010 Endangered Endangered FP - 3712046 CRESSEY Unprocessed Animals - Reptiles - Crotaphytidae - Gambelia sila Animals - Reptiles Emys marmorata western pond turtle ARAAD02030 None None SSC - 3712046 CRESSEY Mapped Animals - Reptiles - Emydidae - Emys marmorata Animals - Reptiles Phrynosoma blainvillii coast horned lizard ARACF12100 None None SSC - 3712046 CRESSEY Unprocessed Animals - Reptiles - Phrynosomatidae - Phrynosoma blainvillii Community - Terrestrial Northern Hardpan Vernal Pool Northern Hardpan Vernal Pool CTT44110CA None None - - 3712046 CRESSEY Mapped Community - Terrestrial - Northern Hardpan Vernal Pool Plants - Vascular Castilleja campestris var. succulenta succulent owl's-clover PDSCR0D3Z1 Threatened Endangered - 1B.2 3712046 CRESSEY Mapped Plants - Vascular - Orobanchaceae - Castilleja campestris var. succulenta Plants - Vascular Orcuttia inaequalis San Joaquin Valley Orcutt grass PMPOA4G060 Threatened Endangered - 1B.1 3712046 CRESSEY Mapped Plants - Vascular - Poaceae - Orcuttia inaequalis
APPENDIX C
CULTURAL RESOURCES REPORTS
Date: 5/14/2020 Records Search File#: 11395L
Project: Livingston Truck Stop,
Livingston, California
Terry L. Farmer
BaseCamp Environmental, Inc.
115 South School Street, Suite 14
Lodi, CA 95240
209-224-8213 [email protected]
Dear Mr. Farmer:
We have conducted a records search as per your request for the above-referenced project area located on the Cressey 7.5’ USGS 7.5-minute quadrangle map in Merced County.
Search of our files includes review of our maps for the specific project area and the immediate vicinity of the project area, and review of the following:
National Register of Historic Places (NRHP)
California Register of Historical Resources (CRHR)
California Inventory of Historic Resources (1976)
California Historical Landmarks
California Points of Historical Interest listing
Office of Historic Preservation Built Environment Resource Directory (BERD) and the Archaeological Determinations of Eligibility (ADOE)
Survey of Surveys (1989)
Caltrans State and Local Bridges Inventory
General Land Office Plats
Other pertinent historic data available at the CCaIC for each specific county The following details the results of the records search:
Prehistoric or historic resources within the project area:
• There are no formally recorded prehistoric or historic archaeological resources or historic buildings within the project area.
• The project area does fall within the proposed boundaries of the Merced Irrigation District (P-24-001909) which was created between 1870-1922, establishing irrigation canals and ditches. There are no recorded contributing water feature elements of the district within the project area.
CENTRAL CALIFORNIA INFORMATION CENTER
California Historical Resources Information System
Department of Anthropology – California State University, Stanislaus One University Circle, Turlock, California 95382
(209) 667-3307
_____________________________________________________________________________________________ Alpine, Calaveras, Mariposa, Merced, San Joaquin, Stanislaus & Tuolumne Counties • The General Land Office Survey Plat for T6S R11E (dated 1/31/1855) does not show any historic features within Section 25.
Prehistoric or historic resources within the immediate vicinity of the project area: There are no formally recorded prehistoric or historic archaeological resources or historic buildings within the immediate vicinity of the project area.
Resources that are known to have value to local cultural groups: None has been formally reported to the Information Center.
Previous investigations within the project area: The project has been subject to seven previous investigations, referenced in the following 11 documents:
CCIC Report ME-01549
Soule, W. (CSU Sacramento, Archeology Study Center; prepared for Caltrans District 10) 1975 An Archaeological Impact Study of California Department of Transportation Project 10-MER-99 27.8/32.8.
CCIC Report ME-03346
O'Connor, Denise (Caltrans District 10)
1984 Historical Architectural Survey Report for the Livingston Freeway Project in Merced County, California, 10-MER-99, PM 26.8/32.8, 10101-043761.
CCIC Report ME-03354
Oman, P. (Caltrans District 10)
1984 Attachment B: Archaeological Survey Report for the Livingston Project, A Proposed Upgrading/Realignment of Highway 99 in Merced County, 10- MER-99, P.M. 26.8/32.8, 10101-043761.
CCIC Report ME-03631
Quad Knopf (Quad Knopf; for City of Livingston)
1999 General Plan, Livingston, California.
CCIC Report ME-04008
Hibbard, C. (California Department of Transportation)
2000 Negative Archaeological Survey Report. 10-MER-99, PM 28.8, 10-170, EA 10-952138.
CCIC Report ME-04184
California Department of Transportation (Department of Transportation) 2001 Supplementary Historic Property Survey Report: Livingston Freeway Project (Re-evaluation), 10-MER-99, P.M. 26.5/28.8, EA 316960.
CCIC Report ME-04184A
Wickstrom, B. (Associate Environmental Planner, Cultural Resource Branch, Central Region) 2001 First Supplemental Archaeological Survey Report for the Livingston Freeway Project Re-evaluation Merced County, California (10-MER-99, P.M.
26.5/28.8, EA 316960).
CCIC Report ME-04184B
O'Connor, D. (Department of Transportation)
1984 Historical Architectural Survey Report for the Livingston Freeway Project in Merced County, California.
CCIC Report ME-04184C
Oman, P. (Department of Transportation)
1984 Archaeological Survey Report for the Livingston Project a Proposed Upgrade/Realignment of Highway 99 in Merced County.
CCIC Report ME-04184D
Hope, A. (California Department of Transportation)
2000 Second Supplementary Historic Architecture Survey Report for the Livingston Freeway Project (Re-evaluation) State Route 99, Merced County.
CCIC Report ME-04620
Farquhar, F. S.
1944 History of Livingston, California--Narrative and Biography (Excerpts).
Recommendations/Comments: Based on existing data in our files the project area has a low sensitivity for the possible discovery of prehistoric or historic resources. Since the project area has been subject to previous investigations, no recommendations for further study are offered at this time.
Please be advised that a historical resource is defined as a building, structure, object, prehistoric or historic archaeological site, or district possessing physical evidence of human activities over 45 years old.
If at any time you might require the services of a qualified professional the Statewide Referral List for Historical Resources Consultants is posted for your use on the internet at http://chrisinfo.org
If archaeological resources are encountered during project-related activities, work should be temporarily halted in the vicinity of the discovered materials and workers should avoid altering the materials and their context until a qualified professional archaeologist has evaluated the situation and provided appropriate recommendations. Project personnel should not collect cultural resources.
If human remains are discovered, California Health and Safety Code Section 7050.5 requires you to protect the discovery and notify the county coroner, who will determine if the find is Native American. If the remains are recognized as Native American, the coroner shall then notify the Native American Heritage Commission (NAHC). California Public Resources Code Section 5097.98 authorizes the NAHC to appoint a Most Likely Descendant (MLD) who will make recommendations for the treatment of the discovery.
Due to processing delays and other factors, not all of the historical resource reports and resource records that have been submitted to the State Office of Historic Preservation are available via this records search. Additional information may be available through the federal, state, and local agencies that produced or paid for historical resource management work in the search area.
Additionally, Native American tribes have historical resource information not in the CHRIS Inventory, and you should contact the California Native American Heritage Commission for information on local/regional tribal contacts.
The California Office of Historic Preservation (OHP) contracts with the California Historical Resources Information System’s (CHRIS) regional Information Centers (ICs) to maintain information in the CHRIS inventory and make it available to local, state, and federal agencies, cultural resource professionals, Native American tribes, researchers, and the public.
Recommendations made by IC coordinators or their staff regarding the interpretation and application of this information are advisory only. Such recommendations do not necessarily represent the evaluation or opinion of the State Historic Preservation Officer in carrying out the OHP’s regulatory authority under federal and state law.
We thank you for contacting this office regarding historical resource preservation. Please let us know when we can be of further service. Please sign and return the attached Access Agreement Short Form.
Note: Billing will be transmitted separately via email from the Financial Services office ($150.00), payable within 60 days of receipt of the invoice.
If you wish to include payment by Credit Card, you must wait to receive the official invoice from Financial Services so that you can reference the CMP # (Invoice Number), and then contact the link below:
https://commerce.cashnet.com/ANTHROPOLOGY
Sincerely,
E. A. Greathouse
E. A. Greathouse, Coordinator
Central California Information Center
California Historical Resources Information System
Copy of invoice to Laurie Marroquin, Financial Services ([email protected]) STATE OF CALIFORNIA Gavin Newsom, Governor
NATIVE AMERICAN HERITAGE COMMISSION