13.04.500 Arrangements for large quantities of water required.

When an abnormally large quantity of water is desired for filling a swimming pool or for other purposes, arrangements must be made with the utility services division (water) prior to taking such water. Permission to take water in unusual quantities will be given only if it can be safely delivered through the city’s facilities and if other consumers are not inconvenienced thereby. (Ord. 443 § 1, 1991)

13.04.510 Equipment maintenance required.

The customer shall, at his own risk and expense, furnish, install and keep in good and safe condition all equipment that may be required for receiving, controlling, applying and utilizing water, and the city shall not be responsible for any loss or damage caused by the improper installation of such equipment, or the negligence or wrongful act of the customer or of any of his tenants, agents, employees, or contractors, licensees or permittees in installing, maintaining, operating or interfering with such equipment. The city shall not be responsible for and will not consider refunds or credits for the loss or wastage of water occasioned by the breakage, leakage or damage to pipe lines on customer’s property which is beyond the customer’s water meter. The city also shall not be responsible for damage to property caused by faucets, valves and other equipment that are open when water is turned on at the customer’s meter, either originally or when turned on after a temporary shutoff. (Ord. 443 § 1, 1991)

13.04.520 Collection by suit—Defendant payment of costs.

Defendant shall pay all costs of suit in any judgment rendered in favor of the city. (Ord. 443 § 1, 1991)

13.04.530 Hydrants—Authorized use only permitted.

Fire hydrants are for use by the utility services division (water) or by the department of public safety (fire division). Other parties desiring to use fire hydrants for any purpose must first obtain written permission from the utility services division (water) prior to use and shall operate the hydrant in accordance with instructions issued by the utility services division (water). Unauthorized use of hydrants will be prosecuted according to law. (Ord. 443 § 1, 1991)

13.04.540 Hydrants—Maintenance charge.

A charge, to be determined by contract between the utility services division (water) and organized fire protection agencies will be imposed for hydrant maintenance and water used for public fire protection. (Ord. 443 § 1, 1991)

13.04.550 Hydrants—Change in location.

When a fire hydrant has been installed in the location specified by proper authority, the city has fulfilled its obligation. If a property owner or other party desires a change in the size, type or location of the hydrant, he shall bear all costs of such changes without refund. Any change in the location of a fire hydrant must have the approval of the proper authority. (Ord. 443 § 1, 1991)

13.04.560 Private fire protection—Applicant to pay installation cost.

The applicant for private fire protection service shall pay the total actual cost of installation of the service from the distribution main to the customer’s premises, including the cost of an approved double detector check device as per City Standard W-11. Customer shall be responsible for maintenance and testing of such device and meter at cost. (Ord. 443 § 1, 1991)

13.04.570 Private fire protection—Connection with other systems prohibited.

There shall be no connections between this fire protection system and any other water distribution system on the premises. (Ord. 443 § 1, 1991)

13.04.580 Private fire protection—Fire extinguishing and testing purposes only authorized.

There shall be no water used through the fire protection service except to extinguish fires and for testing the firefighting equipment. (Ord. 443 § 1, 1991)

13.04.590 Private fire protection—Charges double when—Exception.

Any consumption recorded on the meter will be charged for at double the regular service rates, except that no charge will be made for water used to extinguish fires where such fires have been reported to the department of public safety (fire division). (Ord. 443 § 1, 1991)

13.04.600 Private fire protection—Rate determination.

The monthly rates for private fire protection shall be established by the utility services division (water) upon receipt of application. (Ord. 443 § 1, 1991)

13.04.610 Private fire protection—Tank filling authorized when.

Occasionally water may be obtained from a private fire service for filling a tank connected with a fire service, but only if permission is secured from the utility services division (water) in advance and an approved means of measurement is available. The regular water rates will be applied. (Ord. 443 § 1, 1991)

13.04.620 Private fire protection—Service discontinuance authorized when.

If water is used from a private service in violation of the agreement or of this chapter, the city may, at its option, discontinue and remove the service. (Ord. 443 § 1, 1991)

13.04.630 Private fire protection—Department nonresponsibility for damage.

The city assumes no responsibility for loss or damage due to lack of water or pressure, either high or low, and merely agrees to furnish such quantities and pressures as are available in its general distribution system.

The service is subject to shutdowns and variations required by the operation of the system. (Ord. 443 § 1, 1991)

13.04.640 Private fire protection—Other service connections authorized.

The city shall have the right to take a domestic, commercial or industrial service connection from the fire service connection at the curb to supply the same premises as those to which the fire service connection belongs. The city shall also have the right to determine the proportion of the installation costs properly chargeable to each service connection, if such segregation of costs shall become necessary. (Ord. 443 § 1, 1991)

13.04.650 Private fire protection—Check valve installation authorized.

The city reserves the right to install on all fire service connections a double detector check as per City Standard W-11, at the expense of the owner of the property. (Ord. 443 § 1, 1991)

13.04.660 Backflow protective device—Installation required when.

The customer must comply with state and federal laws governing the separation of dual water systems or installations of backflow protective devices to protect the public water supply from the range of crossconnections. Backflow protective devices must be installed as per city standard and shall be open to test and inspection by the utility services division (water). Plans for the installation of backflow protection devices must be approved by the utility services division (water) prior to installation. (Ord. 443 § 1, 1991)

13.04.670 Pressure relief valves required when.

As a protection to the customer’s plumbing system, a suitable pressure relief valve must be installed and maintained by him, at his expense, when check-valves or other protective devices are used. The relief valve shall be installed between the check-valve and the water heater. (Ord. 443 § 1, 1991)

13.04.680 Backflow protective device—Required on supply lines when.

Whenever backflow protection has been found necessary on a water supply line entering a customer’s premises, then any and all water supply lines from the utility services division (water) mains entering such premises, buildings, or structures shall be protected by an approved backflow device, regardless of the use of the additional water supply lines. (Ord. 443 § 1, 1991)

13.04.690 Backflow protective device—Inspection and testing.

The double check valve or other approved backflow protection devices shall be inspected and tested in accordance with the California Administrative Code Title 17 by the utility services division (water) or a certified tester. The devices shall be serviced, overhauled, or replaced whenever they are found defective, and all costs of repair and maintenance shall be borne by the customer. (Ord. 443 § 1, 1991)

13.04.700 Service discontinuance authorized for check valve installation defected.

The service of water to any premises may be immediately discontinued by the utility services division (water) if any defect is found in the check valve installations or other protective devices, or if it is found that dangerous unprotected cross-connections exist. Service will not be restored until such defects are corrected. (Ord. 443 § 1, 1991)

13.04.710 Department nonliability for service interruption damage.

The city shall not be liable for damage which may result from an interruption in service from a cause beyond the control of the utility services division (water). (Ord. 443 § 1, 1991)

13.04.720 Billing—Period.

The regular billing period will be monthly or bimonthly at the option of the utility services division (water). (Ord. 443 § 1, 1991)

13.04.730 Meters—Reading.

Meters will be read as nearly as possible on the same day of each month, as near the end of each month as practicable and reasonably possible. (Ord. 443 § 1, 1991)

13.04.740 Opening and closing bill proration.

Opening and closing bills for less than the normal billing period shall be prorated both as to minimum charges and quantity by blocks of one hundred cubic feet. If the total period for which service is rendered is less than one month, the bill shall not be less than the monthly minimum charge applicable. Closing bills may be estimated by the utility services division (water) for the final period as an expediency to permit the customer to pay the closing bill at the time service is discontinued. (Ord. 443 § 1, 1991)

13.04.750 Charges due when.

Water charges are due and payable within twenty days of billing date to the property owner or his tenant or agency as designated in the application, and delinquent twenty days after the date indicated on the bill. Service may be discontinued without further notice if payment is not made by the delinquent date. (Ord. 443 § 1, 1991)

13.04.760 Billing—Payment due notice required.

Bills for metered water services shall be rendered at the end of each billing period. Flat rate service shall be billed in advance. Bills shall be payable on presentation. On each bill for water service rendered by the utility services division (water) shall be printed substantially as follows: “Payment is due within twenty (20) days of billing date. Service may be turned off if account is unpaid.” (Ord. 443 § 1, 1991)

13.04.770 Billing—Separate bills required—Exception.

Separate bills will be rendered for each meter installation except where the utility services division (water) has, for its own convenience, installed two or more meters in place of one meter. Where such installations are made the meter readings will be combined for billing purposes. (Ord. 443 § 1, 1991)

13.04.780 Payment guarantee required for turn on.

The water charge begins when a service connection is installed and the meter is set, unless the water is ordered to be left shut off when the service connection is ordered to be installed. Before water is turned on by the utility services division (water) for any purpose whatever, the property owner or tenant must sign a form in which he guarantees payment of future water bills for the service required. The person signing the guarantee form or meter set form will be held liable for water used until the utility services division (water) is notified in writing to discontinue service or to transfer the account to another owner or tenant. (Ord. 443 § 1, 1991)

13.04.790 Unauthorized water use—Consumer liability.

A person taking possession of premises and using water from an active service connection without having made application to the utility services division (water) for meter service shall be held liable for the water delivered from the date of the recorded meter reading, and if the meter is found inoperative, the quantity consumed will be estimated. If proper allocation for water service is not made upon notification to do so by the utility services division (water), and if accumulated bills for service are not paid immediately, the service may be discontinued by the utility services division (water) without further notice. (Ord. 443 § 1, 1991)

13.04.800 Department nonliability for wasted water.

When turning on the water supply as requested, and the house or property is vacant, the utility services division (water) will endeavor to ascertain if water is running on the inside of the building. If such is found to be the case, the water will be left shut off at the curb cock on the inlet side of the meter. The utility services division (water) jurisdiction and responsibility ends at the property line for all purposes, and the utility services division (water) will in no case be liable for loss of wasted water or for damages occasioned by water running from open or faulty fixtures, or from broken, leaking or damaged pipes inside of the property line of the customer. (Ord. 443 § 1, 1991)

13.04.810 Desired discontinuance—Notification required.

Customers desiring to discontinue service should so notify the utility services division (water) two days prior to vacating the premises. Unless discontinuance of service is ordered, the customer shall be liable for regular charges whether or not any water is used. (Ord. 443 § 1, 1991)

13.04.820 Collection by suit—Authorized when.

All unpaid rates and charges and penalties provided in this chapter may be collected by suit. (Ord. 443 § 1, 1991)

13.04.830 Service rates.

Each and all premises which are served by a connection to the water system of the city shall be charged and the owner thereof shall pay a water service usage charge based upon a schedule for such charges fixed by resolution duly adopted by the city council. (Ord. 443 § 1, 1991)

13.04.840 Administrative decision appeal—City council action final.

All ruling of the city council shall be final. All administrative decisions of the staff concerning city policies, rules or regulations shall be appealed, if at all, to the city council within ten days subsequent to written notice of such administrative decision; otherwise, the decision shall be deemed final. (Ord. 443 § 1, 1991)

13.04.850 Meter testing—Required when—Procedure.

All meters will be tested prior to installation, and no meter will be installed which registers more than two percent fast. If a customer desires to have the meter serving his premises tested, he shall first deposit the fees required and may be present when the meter is tested in the meter shop of the utility services division (water).

Should the meter register more than two percent fast, the deposit will be refunded, but should the meter register less than two percent fast, the deposit will be retained by the utility services division (water). (Ord. 443 § 1, 1991)

13.04.860 Meter testing—Refund authorized when.

If a meter tested at the request of a customer is found to be more than two percent fast, the excess charges for the time service was rendered the customer requesting the test, or for a period of six months, whichever shall be the lesser, shall be refunded to the customer. (Ord. 443 § 1, 1991)

13.04.870 Meter testing—Additional billing authorized when.

If a meter tested at the request of a customer is found to be more than five percent slow, the utility services division (water) may bill the customer for the amount of the undercharge based upon corrected meter readings for the period, not exceeding six months, that the meter was in use. (Ord. 443 § 1, 1991)

13.04.880 Charge estimate when meter not registering.

If a meter is found to be not registering, the charges for service shall be at the minimum monthly rate or based on the estimated consumption, whichever is greater. Such estimates shall be made from previous consumption records for a comparable period or by such other method as is determined by the utility services division (water) and its decision shall be final. (Ord. 443 § 1, 1991)

13.04.890 Service discontinuance authorized for nonpayment.

Service may be discontinued for nonpayment of bills on or before the twentieth day following the date of billing. (Ord. 443 § 1, 1991)

13.04.900 Failure to receive bill no relief of liability.

Failure to receive a bill for service rendered does not relieve consumer of liability. Any amount due shall be deemed a debt to the city, and any person, firm or corporation failing, neglecting or refusing to pay such indebtedness shall be liable to an action in the name of the city in any court of competent jurisdiction for the amount thereof. (Ord. 443 § 1, 1991)

13.04.910 Reconnection charge—Meter removal charge.

A reconnection charge, plus penalties as per resolution shall be made and collected prior to renewing service following a discontinuance of water service due to nonpayment of bill, and an additional charge shall be made whenever it is deemed necessary to remove the meter from the premises. (Ord. 443 § 1, 1991)

13.04.920 Delinquent charge penalty.

Rates and charges which are not paid on or before the day of delinquency shall be subject to a penalty of ten percent and thereafter shall be subject to a further penalty of two percent per month on the first day of each month following. (Ord. 443 § 1, 1991)

13.04.930 Security deposit charge.

The security deposit is the charge which insures payment of minimum utility service division (water) charges. Upon discontinuance of service the security deposit shall be applied to reduce any unpaid charges outstanding on the customer’s account. The amount of deposit required shall be established by the city council in the resolution on fees. The security deposit shall be refunded to the customer as provided in this section. (Ord. 443 § 1, 1991)

13.04.940 Waste or nuisance water and other substances.

It is unlawful for any person, firm or corporation to deposit, drain, wash, allow to run or divert into or upon any public road, highway, street or alley, drainage ditch, storm drain or flood control channel owned by or controlled by any public agency within the city, any water, mud, or sand; except that, upon written application of any person filed with the city and approved by the director of public services, the city may, upon such terms and conditions as it may deem advisable to impose, including the charging of a fee therefor, grant a permit to such person to do any of the acts prohibited by this section, provided the same shall not be detrimental to the public health, safety or welfare. For purposes of enforcement of this section, the owner of the meter or property which is the source of the waste or nuisance water or other substance as defined in this section is considered the party responsible for any violations cited under this section. (Ord. 443 § 1, 1991)

13.04.950 Conservation measures—Stage No. 1 normal conditions—Voluntary conservation measures.

Normal conditions shall be in effect when the city is able to meet all the water demands of its customers in the immediate future. During normal conditions all water users should continue to use water wisely, to prevent the waste or unreasonable use of water, and to reduce water consumption to that necessary for ordinary domestic and commercial purposes. (Ord. 443 § 1, 1991)

13.04.960 Stage No. 2—Threatened water supply shortage.

In the event of a threatened water supply shortage which could affect the city’s ability to provide water for ordinary domestic and commercial uses, the city council shall hold a public hearing at which consumers of the water supply shall have the opportunity to protest and to present their respective needs to the city. The city council may then, by resolution, declare a water shortage condition to prevail, and the following conservation measures shall be in effect.

A.     Exterior Landscape Plans. Exterior landscape plans for all new commercial and industrial development shall provide for timed irrigation and shall consider the use of drought resistant varieties of flora.

Such plans shall be presented and approved by the city prior to issuance of a water service letter.

B.      Excessive Irrigation and Related Waste. No customer of the city or other person acting on behalf of or under the direction of a customer shall cause or permit the use of water for irrigation of landscaping or other outdoor vegetation, plantings, lawns or other growth, to exceed the amount required to provide reasonable or excessive waste of water from such irrigation activities or from watering devices or systems.

The free flow of water away from an irrigated site shall be presumptively considered excessive irrigation and waste as defined.

C.      Agricultural Irrigation. Persons receiving water from the city who are engaged in commercial agricultural practices, whether for the purpose of crop production or growing of ornamental plants shall provide, maintain and use irrigation equipment and practices which are the most efficient possible. Upon the request of the director of public services, these persons may be required to prepare a plan describing their irrigation practices and equipment, including but not limited to, an estimate of the efficiency of the use of water on their properties.

D.     Commercial Facilities. Commercial and industrial facilities shall, upon request of the director of public services, provide the city with a plan to conserve water at their facilities. The city will provide these facilities with information regarding the average monthly water use by the facility for the last two-year period.

The facility will be expected to provide the city with a plan to conserve or reduce the amount of water used by that percentage deemed by the city council to be necessary under the circumstances. After review and approval by the director of public services, the water conservation plan shall be considered subject to inspection and enforcement by the city.

E.      Parks, Golf Courses, Swimming Pools and School Grounds. Public and private parks, golf courses, swimming pools and school grounds which use water provided by the city shall use water for irrigation and pool filling between the hours of six p.m. and six a.m.

F.      Domestic Irrigation. Upon notice and public hearing, the city may determine that the irrigation of exterior vegetation shall be conducted only during specified hours and/or days, and may impose other restrictions on the use of water for such irrigation. The irrigation of exterior vegetation at other than these times shall be considered to be a waste of water.

G.     Swimming Pool. All residential, public and recreational swimming pools, of all sizes, shall use evaporation resistant covers and shall recirculate water. Any swimming pool which does not have a cover installed during periods of nonuse shall be considered a waste of water.

H.     Runoff and Washdown. No water provided by the city shall be used for the purposes of washdown of impervious areas without specific written authorization of the director of public services. Any water used on a premises that is allowed to escape the premises and run off into gutters or storm drains shall be considered a waste of water.

I.       Vehicle Washing. The washing of cars, trucks or other vehicles is not permitted, except with a hose equipped with an automatic shut-off device, or at a commercial facility designated and so designated on the city’s billing records.

J.       Drinking Water Provided by Restaurants. Restaurants are requested not to provide drinking water to patrons except by request. (Ord. 443 § 1, 1991)

13.04.970 Stage No. 3—Water shortage emergency—Mandatory conservation measures.

In the event of a water shortage emergency in which the city may be prevented from meeting the water demands of its customers, the city council shall, if possible given the time and circumstances, immediately hold a public hearing at which customers of the city shall have the opportunity to protest and to present their respective needs to the city council. No public hearing shall be required in the event of a breakage or failure of a pump, pipeline, or conduit causing an immediate emergency. The director of public services is empowered to declare a water shortage emergency, subject to the ratification of the city council within seventy-two hours of such declaration, and the following rules and regulations shall be in effect immediately following such declarations:

A.     Prohibition. Watering of parks, school grounds, golf courses, lawn watering, landscape irrigation, washdown of driveways, parking lots or other impervious surfaces, washing of vehicles, except when done by commercial car wash establishments using only recycled or reclaimed water, filling or adding water to swimming pools, wading pools, spas, ornamental ponds, fountains and artificial lakes are prohibited.

B.      Restaurants. Restaurants shall not serve drinking water to patrons except by request.

C.      Construction Meters. No new construction meter permits shall be issued by the city. All existing construction meters shall be removed and/or locked.

D.     Commercial Nurseries and Livestock. Commercial nurseries shall discontinue all watering and irrigation. Watering of livestock is permitted as necessary. (Ord. 443 § 1, 1991)

13.04.980 Mandatory compliance—Implementation and termination.

The director of public services of the city shall monitor the supply and demand for water on a daily basis to determine the level of conservation required by the implementation or termination of the water conservation plan stages and shall notify the city council of the necessity for the implementation or termination of each stage. Each declaration of the city council implementing or terminating a water conservation stage shall be published at least once in a newspaper of general circulation, and shall be posted at the city offices. Each declaration shall remain in effect until the city council otherwise declares, as provided in this section. (Ord. 443 § 1, 1991)

13.04.990 Mandatory compliance—Exception permits.

The director of public services may grant permits for uses of water otherwise prohibited under the provisions of this chapter if he finds and determines that restrictions herein would either:

A.     Hardship. Cause an unnecessary and undue hardship to the water user or the public; or B.      Emergency. Cause an emergency condition affecting the health, sanitation, fire protection or safety of the water use or of the public. (Ord. 443 § 1, 1991)

13.04.1000 Exception granted.

Such exceptions may be granted only upon written application therefor. Upon granting such exception permit, the director of public services may impose any conditions he determines to be just and proper. (Ord. 443 § 1, 1991)

13.04.1010 Enforcement, inspection.

Authorized employees of the city, after proper identification may, during reasonable hours, inspect any facility having a water conservation plan, and may enter onto private property for the purpose of observing the operation of any water conservation device, irrigation equipment or water facility. Employees of the city may also observe the use of water or irrigation equipment within the city from public rights-of-way and as alleged violations are reported to the city. (Ord. 443 § 1, 1991)

13.04.1020 Civil penalties for violation.

Violators of the mandatory provisions of this chapter shall be subject to civil action initiated by the city as follows:

A.     First Violation. For a first violation, the city shall issue a written notice of violation to the water user violating the provisions of this chapter. The notice shall be given pursuant to the requirements listed in Sections 13.04.970 and 13.04.980.

B.      Second Violation. For a second violation of this chapter within a twelve-month period or for failure to comply with the notice of violation within the period stated, a surcharge of one hundred dollars is imposed for the meter through which the wasted water was supplied.

C.      Third Violation. For a third violation of this chapter within a twelve-month period, or for continued failure to comply within thirty days after notice of an imposition of second violation sanctions, a one-month penalty surcharge in the amount of two hundred dollars is imposed for the meter through which the wasted water was supplied. In addition to the surcharge, the city may, at its discretion, install a flow-restricting device at such meter with a one-eighth inch orifice for services up to one and one-half inch size, and comparatively sized restrictors for larger services, on the service of the customer at the premises at which the violation occurred for a period of not less than forty-eight hours. The charge to the customer for installing a flowrestricting device shall be based upon the size of the meter and the actual cost of installation but shall not be less than that provided in the city’s rules and regulations. The charge for removal of the flow-restricting device and restoration of normal service shall be as provided in the city’s rules and regulations.

D.     Subsequent Violations—Discontinuance of Service. For any subsequent violation of this chapter within the twenty-four calendar months after a first violation as provided in this section, the penalty surcharge shall be imposed and the city may discontinue water service to that customer at the premises or to the meter where the violation occurred. The charge for reconnection and restoration of normal service shall be as provided in the rules and regulations of the city. Such restoration of service shall not be made until the director of public services of the city has determined that the water user has provided reasonable assurances that future violations of this chapter by such user will not occur. (Ord. 443 § 1, 1991)

13.04.1030 Notification of violation.

A.     First Violation. For a first violation, written notice shall be given to the customer and/or property owner personally or by regular mail.

B.      Subsequent Violation. If the penalty assessed is a surcharge for a second or third violation, notice may be given by regular mail.

C.      Penalties Involving Installation of Flow-restrictors or Discontinuance of Water Service. If the penalty assessed is, or includes, the installation of a flow restrictor or the discontinuance of water service to the customer for any period of time, notice of the violation shall be given in the following manner:

1.      Personal Service. By giving written notice thereof to the occupant and/or property owner personally, or if the occupant and/or property owner is absent from his/her place of residence and from his/her assumed place of business, by leaving a copy with some person of suitable age and discretion at either place, and sending a copy through the United States mail addressed to the occupant and/or owner of his/her place of business or residence; or

2.      Posting. If such place of residence and business cannot be ascertained, or a person of suitable age or discretion cannot be located, then by affixing a copy in a conspicuous place on the property where the failure to comply is occurring and also by delivering a copy to a person there residing, if such person can be found, and also sending a copy through the United States mail addressed to the occupant at the place where the property is situated and to the owner if different. (Ord. 443 § 1, 1991)

13.04.1040 Form of notice.

All notices provided for in Section 13.04.1030 shall contain, in addition to the facts of the violation, a statement of the possible penalties for each violation and a statement informing the occupant/owner of his/her right to a hearing on the violation. (Ord. 443 § 1, 1991)

13.04.1050 Hearing.

Any customer or property owner against whom a penalty is levied pursuant to this chapter shall have a right to a hearing, in the first instance by the director of public services, with the right of appeal to the city council, on the merits of the alleged violation upon the written request of that customer within fifteen days of the date of alleged violation. At the next regularly scheduled meeting, the customer may then appear and present any evidence in support of his position and ask for a decision by the city council. (Ord. 443 § 1, 1991)

13.04.1060 Delays on action.

The city council shall act promptly to resolve the dispute, but may delay a resolution of the dispute to the time of its next regular meeting in order to investigate the dispute or receive special reports related to the dispute. (Ord. 443 § 1, 1991)

13.04.1070 Decision of the city council.

The decision of the city council shall be final. Should the city council not render a decision within sixty days of application to the city council, this failure to act shall be deemed a denial of the requested action, unless both parties have agreed to extend the resolution period. (Ord. 443 § 1, 1991) View the mobile version.

Loma Linda Municipal Code
Up Previous Next Main Collapse Search Print No Frames
Title 13 WATER AND SEWERS
Chapter 13.32 WATER-EFFICIENT LANDSCAPE

13.32.010 Purpose.

A.     The State Legislature has found that:

1.      The limited supply of state waters are subject to ever increasing demands;

2.      California’s economic prosperity depends on adequate supplies of water;

3.      State Policy promotes conservation and efficient use of water;

4.      Landscapes provide recreation areas, clean the air and water, prevent erosion, offer fire protection and replace ecosystems displaced by development; and

5.      Landscape design, installation and maintenance can and should be water efficient.

B.      Consistent with the legislative findings, the purpose of this chapter is to:

1.      Promote the values and benefits of landscapes while recognizing the need to invest water and other resources as efficiently as possible;

2.      Establish a structure for designing, installing and maintaining water-efficient landscapes in new projects; and

3.      Establish provisions for water management practices and water waste prevention for established landscapes. (Ord. 488 § 1, 1992)

13.32.020 Definitions.

The words used in this chapter have the meaning set forth below:
“Anti-drain valve” or “check valve” means a value located under a sprinkler head to hold water in the system so it minimizes drainage from the lower elevation sprinkler heads. “Application rate” means the depth of water applied to a given area, usually measured in inches per hour. “Applied water” means the portion of water supplied by the irrigation system to the landscape. “As-builts” means a set of reproducible drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor.
“Automatic controller” means a mechanical or solid state timer, capable of operating valve stations to set the days and length of time of a water application. “Backflow prevention device” means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system. “Conversion factor (0.62)” means a number that converts the maximum applied water allowance from acre-inches per acre per year to gallons per square foot per year. The conversion factor is calculated as follows:
(325,829 gallons/43,560 square feet)/12 inches = (0.62) 325,829 gallons = one acre foot
43,560 square feet = one acre
12 inches = one foot
To convert gallons per year to 100-cubic-feet per year, another common billing unit for water, divide gallons per year by 748. (748 gallons = 100 cubic feet.) “Ecological restoration project” means a project where the site is intentionally altered to establish a defined, indigenous, historic ecosystem. “Effective precipitation” or “usable rainfall” means the portion of total precipitation that is used by the plants. Precipitation is not a reliable source of water, but can contribute to some degree toward the water needs of the landscape.
“Emitter” means drip irrigation fittings that deliver water slowly from the system to the soil. “Established landscape” means the point at which plants in the landscape have developed roots into the soil adjacent to the root ball. “Established period” means the first year after installing the plant in the landscape. “Estimated applied water use” means the portion of the estimated total water use is derived from applied water. The estimated applied water use shall not exceed the maximum applied water allowance. The estimated applied water use may be the sum of the water recommended through the irrigation schedule. “Estimated total water use” means the annual total amount of water estimated to be needed to keep the plants in the landscaped area healthy. It is based upon such factors as the local evapotranspiration rate, the size of the landscaped area, the types of plants and the efficiency of the irrigation system. “ET adjustment factor” means a factor of 0.8, that, when applied to reference evapotranspiration, adjusts for plant factors and irrigation efficiency, two major influences upon the amount of water that needs to be applied to the landscape.

A combined plant mix with a site-wide average of 0.5 is the basis of the plant factor portion of this calculation. The irrigation efficiency for purposes of the ET adjustment factor is

0.625, therefore, the ET adjustment factor (0.8) = (0.5/0.625). “Evapotranspiration” means the quantity of water evaporated from adjacent soil surfaces and transpired by plants during a specific time. “Flow rate” means the rate at which water flows through pipes and valves (gallons per minute or cubic feet per second). “Hydrozone” means a portion of the landscaped area having plants with similar water needs that are served by a valve or set or valves with the same schedule. A hydrozone may be irrigated or non-irrigated. For example, a naturalized area planted with native vegetation that will not need supplemental irrigation once established is a non-irrigated hydrozone. “Infiltration rate” means the rate of water entry into the soil expressed as a depth of water per unit of time (inches per hour). “Irrigation efficiency” means the measurement of the amount of water beneficially used divided by the amount of water applied. Irrigation efficiency is derived from measurements and estimates of irrigation system characteristics and management practices. The minimum irrigation efficiency for purposes of this chapter is 0.625. Greater irrigation efficiency can be expected from well designed and maintained systems.
“Landscape irrigation audit” means a process to perform site inspections, evaluate irrigation systems and develop efficient irrigation schedules. “Landscaped area” means the entire parcel less the building footprint, driveways, non-irrigated portions of parking lots, hardscapes — such as decks and patios and other non-porous areas. Water features are included in the calculation of the landscaped area. Areas dedicated to edible plants, such as orchards or vegetable gardens are not included. “Lateral line” means the water delivery pipeline that supplies water to the emitters or sprinklers from the valve. “Main line” means the pressurized pipeline that delivers water from the water source to the valve or outlet. “Maximum applied water allowance” means, for design purposes, the upper limit of annual applied water for the established landscaped area. It is based upon the area’s reference evapotranspiration, the ET adjustment factor, and the size of the landscaped area. The estimated applied water use shall not exceed the maximum applied water allowances. “Mined-land reclamation projects” means any surface mining operation with a reclamation plan approved in accordance with the Surface Mining and Reclamation Act of 1975. “Mulch” means any material such as leaves, bark, straw or other materials left loose and applied to the soil surface to reduce evaporation. “Operating pressure” means the pressure at which a system of sprinklers is designed to operate, usually indicated at the base of a sprinkler. “Overspray” means the water which is delivered beyond the landscaped area, wetting pavements, walks, structures or other non-landscaped areas. “Plant factor” means a factor that when multiplied by reference evapotranspiration, estimates the amount of water used by plants. For purposes of this chapter, the average plant factor or low water using plants ranges from 0 to 0.3, for average water using plants the range is 0.4 to 0.6, and for high water using plants the range is 0.7 to 1.0. “Rain sensing device” means a system which automatically shuts off the irrigation system when it rains. “Record drawing” or “as-builts” means a set of reproducible drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor. “Recreational area” means areas of active play or recreation such as sports fields, school yards, picnic grounds or other areas with intense foot traffic. “Recycled water,” “reclaimed water,” or “treated sewage effluent water” means treated or recycled waste water of a quality suitable for nonpotable uses such as landscape irrigation; not intended for human consumption.
“Reference evapotranspiration” or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given in inches per day, month, or year, and is an estimate of the evapotranspiration of a large field of four-inch to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the maximum applied water allowances so that regional differences in climate can be accommodated. “Rehabilitated landscape” means any re-landscaping project that requires a permit. “Run off” means water which is not absorbed by the soil or landscape to which it is applied and flows from the area. For example, run off may result from water that is applied at too great a rate (application rate exceeds infiltration rate) or when there is a severe slope. “Soil moisture sensing device” means a device that measures the amount of water in the soil. “Soil texture” means the classification of soil based on the percentage of sand, silt, and clay in the soil. “Sprinkler head” means a device which sprays water through a nozzle. “Static water pressure” means the pipeline or municipal water supply pressure when water is not flowing. “Station” means an area served by one valve or by a set of valves that operate simultaneously. “Turf” means a surface layer of earth containing mowed grass with its roots. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue, and tall fescue are cool-season grasses.

Bermudagrass, kikuyugrass, seashore paspalum, St. Augustinegrass, zoysiagrass, and buffalo grass are warm-season grasses. “Usable rainfall” means the portion of total precipitation that is used by the plants. Precipitation is not a reliable source of water, but can contribute to some degree toward the water needs of the landscape.
“Valve” means a device used to control the flow of water in the irrigation system. “Water conservation concept statement” means a one-page checklist and a narrative summary of the project as shown in Exhibit “A” set out following this chapter. (Ord. 488 § 1, 1992)

13.32.030 Provisions for new or rehabilitated landscapes.

A.     APPLICABILITY.

1.      Except as provided in Section 13.32.030(A)(3), this section shall apply to:
a.      All new and rehabilitated landscaping for public agency projects and private development projects that requires a permit; and b.      Developer-installed landscaping in landscape maintenance district areas of single-family and multi-family projects.

2.      Projects subject to this section shall conform to the provisions in this chapter.

3.      This section shall not apply to:
a.      Homeowner-provided landscaping at single-family and multi-family projects; b.      Cemeteries;
c.      Registered historical sites;
d.      Ecological restoration projects that do not require a permanent irrigation system; or e.      Mined-land reclamation projects that do not require a permanent irrigation system; or f.       Any project with a landscaped area less than twenty- five thousand square feet.

B.      LANDSCAPE DOCUMENTATION PACKAGE.

1.      A copy of the landscape documentation package conforming to this chapter shall be submitted to the city or county. No permit shall be issued until the city or county reviews and approves the landscape documentation package.

2.      A copy of the approved landscape documentation package shall be provided to the property owner or site manager along with the record drawings and any other information normally forwarded to the property owner or site manager.

3.      A copy of the water conservation concept statement and the certificate of substantial completion shall be sent by the project manager to the local retail water purveyor.

4.      Each landscape documentation package shall include the following elements, which are described herein:
a.      Water conservation concept statement;
b.      Calculation of the maximum applied water allowance; c.      Calculation of the estimated applied water use; d.      Calculation of the estimated total water use;
e.      Landscape design plan;
f.       Irrigation design plan;
g.      Irrigation schedule;
h.      Maintenance schedule;
i.       Landscape irrigation audit schedule;
j.       Grading design plan;
k.      Soil analysis;
l.       Certificate of substantial completion (to be submitted after installation of the project.)

5.      If effective precipitation is included in the calculation of the estimated total water use, then an effective precipitation disclosure statement from the landscape professional and the property owner shall be submitted with the landscape documentation package.

C.      ELEMENTS OF LANDSCAPE DOCUMENTATION PACKAGE.

1.      Water Conservation Concept Statement. Each landscape documentation package shall include a cover sheet, referred to as the water conservation concept statement similar to the following example. It serves as a check list to verify that the elements of the landscape documentation package have been completed and has a narrative summary of the project.

2.      The Maximum Applied Water Allowance.
a.      A project’s maximum applied water allowance shall be calculated using the following formula:

MAWA = (ETo) (o.8) (LA) (o.62) where:

MAWA = Max. applied water allowance (gallons per year)
ETo = Reference evapotranspiration (inches per year)

0.8 = ET adjustment factor
LA = Landscaped area (square feet)

0.62 = Conversion factor (to gallons per square foot)
b.      Two example calculations of the maximum applied water allowance i.       Project Site One: Landscaped area of 50,000 sq. ft. in Fresno MAWA = (ETo) (.8) (LA) (.62)
= (51 inches) (.8) (50,000 square feet) (.62)
Maximum applied water allowance = 1,264,800 gallons per year (or 1,691 hundred-cubic-feet per year: 1,264,800/748 = 1,691) ii.      Project Site Two: Landscaped area of 50,000 sq. ft. in San Francisco MAWA = (ETo) (.8) (LA) (.62)
= (35 inches) (.8) (50,000 square feet) (.62)
Maximum Applied Water Allowance = 868,000 gallons per year (or 1,160 hundred-cubic-feet per year) c.      Portions of landscaped areas in public and private projects such as parks, playgrounds, sports fields, golf courses, or school yards where turf provides a playing surface or serves other recreational purposes may require water in addition to the maximum applied water allowance. A statement shall be included with the landscape design plan, designating areas to be used for such purposes and specifying any needed amount of additional water above the maximum applied water allowance.

3.      Estimated Applied Water Use.
a.      The estimated applied water use shall not exceed the maximum applied water allowance. b.      A calculation of the estimated applied water use shall be submitted with the landscape documentation package. It may be calculated by summing the amount of water recommended in the irrigation schedule.

4.      Estimated Total Water Use.
a.      A calculation of the estimated total water use shall be submitted with the landscape documentation package. The estimated total water use may be calculated by summing the amount of water recommended in the irrigation schedule and adding any amount of water expected from effective precipitation (not to exceed twenty-five percent of the local annual mean precipitation) or may be calculated from a formula such as the following:

The estimated total water use for the entire landscaped area equals the sum of the estimated water use of all hydrozones in that landscaped area:

EWU (hydrozone) = (ETo) (PF) (HA) (.62)
(IE)
EWU (hydrozone) = Estimated water use (gallons per year) ETo = Reference evapotranspiration (inches per year)
PF = Plant factor
HA = Hydrozone area (square feet)
(.62) = Conversion factor
IE = Irrigation efficiency
b.      If the estimated total water use is greater than the estimated applied water use due to precipitation being included as a source of water, an effective precipitation disclosure statement such as the one in the section entitled “Effective Precipitation” shall be included in the landscape documentation package.

5.      Landscape Design Plan. A landscape design plan meeting the following requirements shall be submitted as part of the landscape documentation package:
a.      Plant Selection and Grouping.
i.       Any plants may be used in the landscape, providing the estimated applied water use recommended does not exceed the maximum applied water allowance and that the plants meet the specifications set forth in subsections (a)(ii), (a)(iii), and (a)(iv) immediately following. ii.      Plants having similar water use shall be grouped together in distinct hydrozones. iii. Plans shall be selected appropriately based upon their adaptability to the climatic, geologic, and topographical conditions of the site. Protection and preservation of native species and natural areas is encouraged. The planting of trees is encouraged wherever it is consistent with the other provisions of this chapter. iv.     Fire prevention needs shall be addressed in areas that are fire prone. Information about fire prone areas and appropriate landscaping for fire safety is available from local fire departments or the California Department of Forestry.
b.      Water Features.
i.       Recirculating water shall be used for decorative water. ii.      Pool and spa covers are encouraged.
c.      Landscape Design Plan Specifications. The landscape design plan shall be drawn on project base sheets at a scale that accurately and clearly identifies:
i.       Designation of hydrozones;
ii.      Landscape materials, trees, shrubs, groundcover, turf, and other vegetation. Planting symbols shall be clearly drawn and plants labeled by botanical name, common name, container size, spacing, and quantities of each group of plants indicated; iii. Property lines and street names;
iv.     Streets, driveways, walkways, and other paved areas; v.      Pools, ponds, water features, fences and retaining walls; vi.     Existing and proposed buildings and structures including elevation if applicable; vii. Natural features including but not limited to rock outcroppings, existing trees, shrubs that will remain; viii. Tree staking, plant installation, soil preparation details, and any other applicable planting and installation details; ix.     A calculation of the total landscaped area;
x.      Designation of recreational areas.

6.      Irrigation Design Plan. An irrigation design plan meeting the following conditions shall be submitted as part of the landscape documentation package:
a.      Irrigation Design Criteria.
i.       Runoff and Overspray. Soil types and infiltration rate shall be considered when designing irrigation systems. All irrigation systems shall be designed to avoid runoff, low head drainage, overspray, or other similar conditions where water flows onto adjacent property, non-irrigated areas, walks, roadways or structures. Proper irrigation equipment and schedules, including features such as repeat cycles, shall be used to closely match application rates to infiltration rates therefore minimizing runoff.

Special attention shall be given to avoid runoff on slopes and to avoid overspray in planting areas with a width less than ten feet, and in median strips. No overhead sprinkler irrigation systems shall be installed in median strips less than ten feet wide. ii.      Irrigation Efficiency. For the purpose of determining the maximum water allowance, irrigation efficiency is assumed to be 0.625. Irrigation systems shall be designed, maintained, and managed to meet or exceed 0.625 efficiency. iii. Equipment.
(A)   Water Meters. Separate landscape water meters shall be installed for all projects except for single family homes or any projects except for single-family homes or any project with a landscaped area of less than five thousand square feet. (B)    Controllers. Automatic control systems shall be required for all irrigation systems and must be able to accommodate all aspects of the design. (C)    Valves. Plants which require different amounts of water shall be irrigated by separate valves. If one valve is used for a given area, only plants with similar water use shall be used in that area. Anti-drain (check) valves shall be installed in strategic points to minimize or prevent low-head drainage. (D)   Sprinkler Heads. Heads and emitters shall have consistent application rates within each control valve circuit. Sprinkler heads shall be selected for proper area coverage, application rate, operating pressure, adjustment capability, and ease of maintenance. (E)    Rain Sensing Override Devices. Rain sensing override devices shall be required on all irrigation systems. (F)    Soil Moisture Sensing Devices. It is recommended that soil moisture sensing devices be considered where appropriate. b.      Recycled Water.
i.       The installation of recycled water irrigation systems (dual distribution systems) shall be required to allow for the current and future use of recycled water, unless a written exemption has been granted as described in the following subsection (b)(ii). ii.      Irrigation systems shall make use of recycled water unless a written exemption has been granted by the local water agency, stating that recycled water meeting all health standards is not available and will not be available in the foreseeable future. iii. The recycled water irrigation systems shall be designed and operated in accordance with all local and state codes. c.      Irrigation Design Plan Specifications. Irrigation systems shall be designed to be consistent with hydrozones. The irrigation design plan shall be drawn on project base sheets. It should be separate from, but use the same format as, the landscape design plan. The scale shall be the same as that used for the landscape design plan.

The irrigation design plan shall accurately and clearly identify:
i.       Location and size of separate water meters for the landscape; ii.      Location, type and size of all components of the irrigation system, including automatic controllers, main and lateral lines, valves, sprinkler heads, moisture sensing devices, rain switches, quick couplers, and backflow prevention devices; iii. Static water pressure at the point of connection to the public water supply; iv.     Flow rate (gallons per minute), application rate (inches per hour), and design operating pressure (psi) for each station; v.      Recycled water irrigation systems as specified in this chapter.

7.      Irrigation Schedules. Irrigation schedules satisfying the following conditions shall be submitted as part of the landscape documentation package:
a.      An annual irrigation program with monthly irrigation schedules shall be required for the plant establishment period, for the established landscape, and for any temporarily irrigated areas.
b.      The irrigation schedule shall:
i.       Include run time (in minutes per cycle), suggested number of cycles per day, and frequency of irrigation for each station; and ii.      Provide the amount of applied water (in hundred cubic feet, gallons or whatever billing units the local water supplier uses) recommended on a monthly and annual basis. c.      The total amount of water for the project shall include water designated in the estimated total water use calculation plus water needed for any water features, which shall be considered as a high water using hydrozone.
d.      Recreational areas designated in the landscape de-sign plan shall be highlighted and the irrigation schedule shall indicate if any additional water is needed above the maximum applied water allowance because of high plant factors (but not due to irrigation inefficiency). e.      Whenever possible, irrigation scheduling shall incorporate the use of evapotranspiration data such as those from the California Irrigation Management Information System (CIMIS) weather stations to apply the appropriate levels of water for different climates. f.       Whenever possible, landscape irrigation shall be between two a.m. and ten a.m. to avoid irrigating during times of high wind or high temperature.

8.      Maintenance Schedules. A regular maintenance schedule satisfying the following conditions shall be submitted as part of the landscape documentation package:
a.      Landscapes shall be maintained to ensure water efficiency. A regular maintenance schedule shall include but not be limited to checking, adjusting, and repairing irrigation equipment; resetting the automatic controller; aerating and dethatching turf areas; replenishing mulch; fertilizing; pruning, and weeding in all landscaped areas. b.      Whenever possible, repair of irrigation equipment shall be done with the originally specified materials or their equivalents.

9.      Landscape Irrigation Audit Schedules. A schedule of landscape irrigation audits, for all but single-family residences, satisfying the following conditions shall be submitted to the city or county as part of the landscape documentation package:
a.      At a minimum, audits shall be in accordance with the state of California Landscape Water Management Program as described in the Landscape Irrigation Auditor Handbook, the entire document, which is incorporated by reference. (See Landscape Irrigation Auditor Handbook (June 1990) Version 5.5 [formerly Master Auditor Training].) b.      The schedule shall provide for landscape irrigation audits to be conducted by certified landscape irrigation auditors at least once every five years.

10.    Grading Design Plan. Grading design plans satisfying the following conditions shall be submitted as part of the landscape documentation package:
a.      A grading design plan shall be drawn on project base sheets. It should be separate from but use the same format as the landscape design plan. b.      The grading design plan shall indicate finished configurations and elevations of the landscaped area, including the height of graded slopes, drainage patterns, pad elevations, and finish grade.

11.    Soils.
a.      A soil analysis satisfying the following conditions shall be submitted as part of the landscape documentation package:
i.       Determination of soil texture, indicating the percentage of organic matter; ii.      An approximate soil infiltration rate (either measured or derived form soil texture/infiltration rate tables). A range of infiltration rates should be noted where appropriate; iii. Measure of pH, and total soluble salts.
b.      A mulch of at least three inches shall be applied to all planting areas except turf.

12.    Certification.
a.      Upon completing the installation of the landscaping and the irrigation system, an irrigation audit shall be conducted by a certified landscape irrigation auditor prior to the final field observation. (See Landscape Irrigation Auditor Handbook as referenced in Section 13.32.040.) b.      A licensed landscape architect or contractor, certified irrigation designer, or other licensed professional in a related field shall conduct a final field observation and shall provide a certificate of substantial completion to the city or county. The certificate shall specifically indicate that plants were installed as specified, that the irrigation system was installed as designed, and that an irrigation audit has been performed, along with a list of any observed deficiencies. c.      Certification shall be accomplished by completing a certificate of substantial completion and delivering it to the city or county, to the retail water supplier, and to the owner of record. A sample of such a form, which shall be provided by the city or county is set out in Exhibit “B” following this chapter.

D.     PUBLIC EDUCATION—PUBLICATIONS. Local agencies shall provide information to owners of all new, single-family residential homes regarding the design, installation, and maintenance of water efficient landscapes.

Information about the efficient use of landscape water shall be provided to water users throughout the community. (Ord. 488 § 1, 1992)

13.32.040 Provisions for existing landscapes.

A.     Water Management. All existing landscaped areas to which the city or county provides water that are one acre or more shall have a landscape irrigation audit at least every five years. At a minimum, the audit shall be in accordance with the California Landscape Water Management Program as described in the Landscape Irrigation Auditor Handbook, the entire document which is hereby incorporated by reference. (See Landscape Irrigation Auditor Handbook, Dept. of Water Resources, Water Conservation Office (June 1990) Version 5.5.)

1.      If the project’s water bills indicate that they are using less than or equal to the maximum applied water allowance for that project site, an audit shall not be required.

2.      Recognition of projects that stay within the maximum applied water allowance is encouraged.

B.      Water Waste Prevention. Cities and counties shall prevent water waste resulting from inefficient landscape irrigation by prohibiting runoff, low head drainage, overspray, or other similar conditions where water flows onto adjacent property, non-irrigated areas, walks, roadways or structures. Penalties for violation of these prohibitions shall be established locally. (Ord. 488 § 1, 1992)

13.32.050 Effective precipitation.

SAMPLE CERTIFICATE OF SUBSTANTIAL COMPLETION
If effective precipitation is included in the calculation of the estimated total water use, an effective precipitation disclosure statement (similar to the sample Exhibit “C” set out following this chapter) shall be completed, signed, and submitted with the landscape documentation package. No more than twenty-five percent of the local annual mean precipitation shall be considered effective precipitation in the calculation of the estimated total water use. (Ord. 488 § 1, 1992) EXHIBIT “A” SAMPLE WATER CONSERVATION CONCEPT STATEMENT Project Site: Project Number:

Project Location:

Landscape Architect/Irrigation Designer/Contractor:

Included in this project submittal package are:
(Check to indicate completion)
___ 1. Maximum Applied Water Allowance:
___ gallons or cubic feet/year
___ 2. Estimated Applied Water Use:
___ gallons or cubic feet/year
*__ 2.(a) Estimated Amount of Water Expected from Effective Precipitation:
___ gallons or cubic feet/year
___ 3. Estimated Total Water Use:
___ gallons or cubic feet/year
Note: * If the design assumes that a part of the Estimated Total Water Use will be provided by precipitation, the Effective Precipitation Disclosure Statement in Section 704 shall be completed and submitted. The Estimated Amount of Water Expected from Effective Precipitation shall not exceed 25 percent of the local annual mean precipitation (average rainfall). ___ 4. Landscape Design Plan
___ 5. Irrigation Design Plan
___ 6. Irrigation Schedule
___ 7. Maintenance Schedule
___ 8. Landscape Irrigation Audit Schedule
___ 9. Grading Design Plan
___ 10. Soil Analysis
Description of Project
(Briefly describe the planning and design actions that are intended to achieve conservation and efficiency in water use.) Date:__________________ Prepared By:____________________ EXHIBIT “B” SAMPLE CERTIFICATE OF SUBSTANTIAL COMPLETION Project Site/Number:___________________________________________________________ Project Location:______________________________________________________________ Preliminary Project Documentation Submitted (Check indicating submittal) ___ 1. Maximum Applied Water Allowance:
___ (gallons or cubic feet per year)
___ 2. Estimated Applied Water Use:
___ (gallons or cubic feet/year)
___ *2a. Estimated Amount of Water Expected from Effective Precipitation:
___ (gallons of cubic feet/year)
___ 3. Estimated Total Water Use:
___ (gallons of cubic feet/year)
NOTE: *If the design assumes that a part of the Estimated Total Water Use will be provided by precipitation, the Effective Precipitation Disclosure Statement shall be completed and submitted. The estimated Amount of Water Expected from Effective Precipitation shall not exceed 25 percent of the local annual mean precipitation (average rainfall). ___ 4. Landscape Design Plan
___ 5. Irrigation Design Plan
___ 6. Irrigation Schedules
___ 7. Maintenance Schedule
___ 8. Landscape Irrigation Audit Schedule
___ 9. Grading Design Plan
___ 10. Soil Analysis
Post-Installation Inspection: (Check indicating substantial completion) ___ A. Plants installed as specified
___ B. Irrigation system installed as designed
B.      ___ dual distribution system for recycled water B.      ___ minimal run off or overspray
___ C. Landscape irrigation Audit performed
___ Project submittal package and a copy of this certification has been provided to owner/manager and local water agency.

Comments:
________________________________________________________________________________________________________________________________________________________________________ I/we certify that work has been installed in accordance with the contract documents. ________________________________________________________________________ Contractor Signature
________________________________________________________________________ Date License Number
I/we certify that based upon periodic site observations, the work has been substantially completed in accordance with the Water Efficient Landscape Ordinance and that the landscape planting and irrigation installation conform with the approved plans and specifications.
________________________________________________________________________ Landscape Architect Signature
or Irrigation Designer/Consultant
or Licensed or Certified Professional in a Related Field ________________________________________________________________________ Date State License Number
I/we certify that I/we have received all of the contract documents and that it is our responsibility to see that the project is maintained in accordance with the contract documents. ________________________________________________________________________ Owner Signature
____________________
Date
EXHIBIT “C” SAMPLE EFFECTIVE PRECIPITATION DISCLOSURE STATEMENT I certify that I have informed the project owner and developer that this project depends on ______ (gallons or cubic feet) of effective precipitation per year. This represents _____ percent of the local mean precipitation of _______ inches per year.

I have based my assumptions about the amount of precipitation that is effective upon:
________________________________________________________________________________________________________________________________________________________________________ I certify that I have informed the project owner and developer that in times of drought, there may not be enough water available to keep the entire landscape alive. _____________________________________
Licensed or Certified Landscape Professional
I certify that I have been informed by the licensed or certified landscape professional that this project depends upon _________ (gallons or cubic feet) of effective precipitation per year. This represents _________ percent of the local mean precipitation of _______ inches per year.

I certify that I have been informed that in times of drought, there may not be enough water available to keep the entire landscape alive. ________________________ ______________________________ Owner Developer
EXHIBIT “D” REFERENCE EVAPOTRANSPIRATION
(In inches—Historical Data, extrapolated from 12-month Normal Year ETo Maps and U.C. publication 21426)

SAN BERNARDINO COUNTY
Ann
City Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ETo. ________________________________________________________________________________ Baker 2.7 3.9 6.1 8.3 10.4 11.8 12.2 11.0 8.9 6.1 3.3 2.1 86.6 Barstow 2.6 3.6 5.7 7.9 10.1 11.6 12.0 10.4 8.6 5.7 3.3 2.1 83.6 Chino 2.1 2.9 3.9 4.5 5.7 6.5 7.3 7.1 5.9 4.2 2.6 2.0 54.6 Crestline 1.5 1.9 3.3 4.4 5.5 6.6 7.8 7.1 5.4 3.5 2.2 1.6 50.8 Needles 3.2 4.2 6.6 8.9 11.0 12.4 12.8 11.0 8.9 6.6 4.0 2.7 92.1 Lucerne
Valley 2.2 2.9 5.1 6.5 9.2 11.0 11.4 9.9 7.4 5.0 3.0 1.8 75.3 San
Bernardino 2.0 2.7 3.8 4.6 5.7 6.9 7.9 7.4 5.9 4.2 2.6 2.0 55.6 29 Palms 2.6 3.6 5.9 7.9 10.1 11.2 11.2 10.3 8.6 5.9 3.4 2.2 82.9 Victorville 2.3 3.1 4.9 6.7 9.3 10.0 11.2 9.8 7.4 5.1 2.8 1.8 74.6 View the mobile version.

City of Loma Linda Attachment 2
Water Shortage Contingency Plan 20
Attachment 2
Adoption Resolution
2 Water Shortage
Contingency Plan
City of Loma Linda
MAY 2026 CITY OF LOMA LINDA

CITY OF LOMA LINDA
Water Shortage
Contingency Plan
MAY 2026
Prepared by Water Systems Consulting, Inc and Blua
Consulting LLC

ACKNOWLEDGEMENTS
The Water Shortage Contingency Plan was prepared by Water Systems Consulting, Inc. The primary authors are listed below.

Laine Carlson, PE
Aaron Morland, PE
Patricia Parks, PE
Ariana Lopez
Madeline Blua
Water Systems Consulting, Inc. would like to acknowledge the significant contributions of [Client and/or Partner]. The primary contributors are listed below.

Ralph Muñoz
Elias Herrera
Kirk Mayo
Table of Contents
Water Shortage Contingency Plan | i

TABLE OF CONTENTS
City of Loma Linda ..................................................................................................................... 1

1.0 Water Service Reliability Analysis.................................................................................... 3

2.0 Annual Water Supply and Demand Assessment Procedures .......................................... 3

3.0 Water Shortage Stages ................................................................................................... 6

4.0 Shortage Response Actions ............................................................................................ 8

4.1 Supply Augmentation................................................................................................... 8

4.2 Demand Reduction ...................................................................................................... 9

4.3 Operational Changes and Additional Mandatory Restrictions......................................13

4.4 Emergency Response Plan.........................................................................................13

4.5 Seismic Risk Assessment and Mitigation Plan ............................................................13

4.6 Shortage Response Action Effectiveness ...................................................................14

5.0 Communication Protocols...............................................................................................14

6.0 Compliance and Enforcement ........................................................................................14

7.0 Legal Authority ...............................................................................................................15

7.1 Declaration of Water Shortage....................................................................................15

7.2 Proclamation of Local Emergency...............................................................................15

8.0 Financial Consequences of WSCP Implementation........................................................15

9.0 Monitoring and Reporting ...............................................................................................16

10.0 WSCP Refinement Procedures...................................................................................17

11.0 Plan Adoption, Submittal, and Availability ...................................................................17 References ...............................................................................................................................18 Attachment 1.............................................................................................................................19 Attachment 2.............................................................................................................................20 List of Figures
Water Shortage Contingency Plan | ii

LIST OF FIGURES
Figure 1: Regional and Retail Agency Annual Assessment Process and Timeline ..................... 6 Figure 2: Crosswalk to DWR Six Standard Stages..................................................................... 7 List of Tables
Water Shortage Contingency Plan | iii

LIST OF TABLES
Table 1: Annual Assessment Procedure .................................................................................... 4 Table 2: DWR 8-1 Water Shortage Contingency Plan Stages .................................................... 8 Table 3: DWR 8-2R Supply Augmentation & Other Actions........................................................ 9 Table 4: DWR 8-3R Demand Reduction Actions.......................................................................10 Acronyms & Abbreviations
Water Shortage Contingency Plan | iv

ACRONYMS & ABBREVIATIONS
AWIA American Water Infrastructure Association
AWSDA Annual Water Supply and Demand Assessment
BTAC Basin Technical Advisory Committee
CWC California Water Code
CII Commercial, Industrial, and Institutional
DWR California Department of Water Resources
DRA Drought Risk Assessment
ERP Emergency Response Plan
RRA Risk and Resilience Assessment
RUWMP Regional Urban Water Management Plan
SBV San Bernardino Valley Municipal Water District
SWP State Water Project
UWMP Urban Water Management Plan
WSCP Water Shortage Contingency Plan
Water Shortage Contingency Plan 1
City of Loma Linda
This Water Shortage Contingency Plan (WSCP) is a strategic plan that the City of Loma Linda (Loma Linda) uses to prepare for and respond to water shortages.

A water shortage occurs when the water supply available is insufficient to meet the normally expected customer water use at a given point in time. A shortage may occur due to a number of reasons. This includes water supply quality changes, climate change, drought, regional power outages, and catastrophic events (e.g., earthquakes). Additionally, the State may declare a statewide drought emergency and mandate that water suppliers reduce demands. The WSCP serves as the operating manual that Loma Linda will use to prevent catastrophic service disruptions through proactive, rather than reactive, mitigation of water shortages.

This WSCP provides a process for an Annual Water Supply and Demand Assessment and structured steps designed to respond to actual conditions. This level of detailed planning and preparation provides accountability and predictability to help Loma Linda maintain reliable supplies and reduce the impact of any supply shortages and/or interruptions.

This WSCP was prepared in conjunction with Loma Linda’s 2025 Urban Water Management Plan (UWMP), which is included in the 2025 Regional Urban Water Management Plan (2025 RUWMP) and is a standalone document that can be modified as needed. This document is compliant with the California Water Code (CWC) Section 10632 and incorporates guidance from the State of California Department of Water Resources (DWR) UWMP Guidebook.

IN THIS S ECTION
• Water Service Reliability
• Annual Water Supply and
Demand Assessment
• Supply Shortage Stages and
Response Actions
City of Loma Linda
Water Shortage Contingency Plan 2
The WSCP describes the following:

1. Water Service Reliability Analysis: Summarizes Loma Linda’s water supply analysis and reliability and identifies any key issues that may trigger a shortage condition.

2. Annual Water Supply and Demand Assessment Procedures: Describes the key data inputs, evaluation criteria, and methodology for assessing the system’s reliability for the coming year and the steps to formally declare any water shortage stages and response actions.

3. Water Shortage Stages: Establishes water shortage stages to clearly identify and prepare for shortages.

4. Shortage Response Actions: Describes the response actions that may be implemented or considered for each stage to reduce gaps between supply and demand.

5. Communication Protocols: Describes communication protocols under each stage to ensure customers, the public, and government agencies are informed of shortage conditions and requirements.

6. Compliance and Enforcement: Defines compliance and enforcement actions available to administer demand reductions.

7. Legal Authority: Lists the legal documents that grant the City the authority to declare a water shortage and implement and enforce response actions.

8. Financial Consequences of WSCP Implementation: Describes the anticipated financial impact of implementing water shortage stages and identifies mitigation strategies to offset financial burdens.

9. Monitoring and Reporting: Summarizes the monitoring and reporting techniques to evaluate the effectiveness of shortage response actions and overall WSCP implementation. Results are used to determine if shortage response actions should be adjusted.

10. WSCP Refinement Procedures: Describes the factors that may trigger updates to the WSCP and outlines how to complete an update.

11. Plan Adoption, Submittal, and Availability: Describes the process for the WSCP adoption, submittal, and availability after each revision.

City of Loma Linda
Water Shortage Contingency Plan 3

1.0 Water Service Reliability Analysis
As part of the 2025 RUWMP, Loma Linda completed a water supply reliability analysis for normal, single-dry, and five-year consecutive dry year periods from 2030-2050. A Drought Risk Assessment (DRA) was also performed to analyze supply reliability under five consecutive years of drought from 2026-2030. As described in Chapter 3 of the 2025 RUWMP, the effects of a local drought are not immediately recognized since the region uses the local groundwater basins to simulate a large reservoir for long-term storage. Loma Linda is able to pump additional groundwater to meet increased demands in dry years and participates in efforts to replenish the basins with imported and local water through regional recharge programs. Additionally, Loma Linda implements several ongoing water conservation measures. Regional recharge programs and conservation help to optimize and enhance the use of regional water resources.

Based on the 2025 RUWMP analysis, Loma Linda’s water supply is reliable and not expected to see impactful change under drought conditions.

Even though localized drought conditions should not affect supply, other shortages may occur due to a number of reasons, such as water supply quality changes, regional power outage, State mandates for water use efficiency standards, and catastrophic events (e.g., earthquakes).

Therefore, Loma Linda will use this WSCP as appropriate to address shortages and other supply emergencies.

2.0 Annual Water Supply and Demand
Assessment Procedures
As an urban water supplier, Loma Linda must prepare and submit an Annual Water Supply and Demand Assessment (AWSDA or Annual Assessment) by July 1 each year pursuant to California Water Code (CWC) Section 10632.1 The Annual Assessment is an evaluation of the near-term outlook for supplies and demands to determine whether the potential for shortage exists and whether there is a need to trigger a WSCP shortage stage and response actions in the current calendar year to maintain supply reliability. This process will take place at the same time each year based on known circumstances and information available to Loma Linda at the time of analysis and can be updated or revised at any time if circumstances change.

Loma Linda will convene an internal WSCP Team to conduct the Annual Assessment each year.

The WSCP Team may include the following staff:
• Utilities Superintendent
• Finance
City of Loma Linda
Water Shortage Contingency Plan 4
The Annual Assessment procedure, including key data inputs and evaluation criteria, is summarized in Table 1. The Annual Assessment procedure and timeline, along with how it integrates with the annual assessment that will be conducted on a regional basis in parallel, is shown graphically in Figure 1.

Table 1: Annual Assessment Procedure
TIMING

ASSESSMENT

ACTIVITIES

PROCEDURE, KEY DATA INPUTS, EVALUATION

CRITERIA AND OTHER CONSIDERATIONS
STAFF

RESPONSIBLE
JAN - FEB Estimate
unconstrained
demands for coming
year
Demands will be estimated based on water sales
forecasts from annual budget or prior year demands
plus any anticipated changes.

WSCP Team
JAN - FEB Estimate available
supplies for the
year, considering the
following year will
be dry
The Basin Technical Advisory Committee (BTAC)
evaluates groundwater in storage each year. The
Bunker Hill basin is sustainably managed to provide
storage for use in dry years. In the unlikely event that local supplies are reduced, Loma Linda will coordinate
with the BTAC to identify anticipated supplies.

Utilities
Superintendent
JAN - FEB Consider potential
constraints that may
impact supply
delivery
Identify any known regional or Loma Linda
infrastructure issues that may pertain to near-term
water supply reliability, including repairs, construction, and environmental mitigation measures that may
temporarily constrain capabilities, as well as any new
projects that may add to system capacity.

Identify any facilities out of service due to water
quality problems, equipment failure, etc. that may
impact normal water deliveries.

Identify any potential or emerging impacts to
groundwater quality, such as emerging regulatory
constraints that may limit use of available supplies for potable needs.

Utilities
Superintendent
City of Loma Linda
Water Shortage Contingency Plan 5
TIMING

ASSESSMENT

ACTIVITIES

PROCEDURE, KEY DATA INPUTS, EVALUATION

CRITERIA AND OTHER CONSIDERATIONS
STAFF

RESPONSIBLE
FEB Convene WSCP
Team to conduct
Annual Assessment
Compare supplies and demands and discuss any
constraints that may impact supply delivery. If the
potential for a shortage exists, determine which
shortage response stage and actions are recommended
to reduce/eliminate the shortage.

Additionally, if the State declares a drought state of
emergency and requires demand reductions, the WSCP
Team will determine which water shortage stage and
response actions are needed to comply with the State
mandate.

WSCP Team
JUNE City Council If the potential for a shortage exists or the State has mandated demand reductions, the results of the Annual
Assessment will be presented to the Loma Linda City
Council, including the recommended shortage stage and
response actions. The City Council may order the
implementation of a shortage stage and will adopt a
resolution declaring the applicable water shortage
stage.

City Manager &
Council
ONGOINGImplement WSCP
actions, if needed
Relevant members of Loma Linda staff will implement
shortage response actions associated with the declared
water shortage stage.

WSCP Team
BY JULY 1 Submit Retail Annual
Assessment
Send Final Retail Annual Assessment to DWR. WSCP Team
City of Loma Linda
Water Shortage Contingency Plan 6
Figure 1: Regional and Retail Agency Annual Assessment Process and Timeline

3.0 Water Shortage Stages
With the exception of a catastrophic failure of infrastructure, Loma Linda does not foresee imposing a water shortage stage due to a supply shortage. Loma Linda may impose a water shortage stage to encourage efficient water use and to comply with State drought mandates, such as those that occurred in 2014 and again in 2022 with Governor Newsom’s Executive Order N-7-22 (EO N-7-22), which required that urban water suppliers implement demand reduction actions listed in the supplier’s State standard shortage Stage 2. This section provides information on the water shortage stages and response actions that Loma Linda may implement.

Loma Linda uses three shortage stages to identify and respond to water shortage emergencies.

At a minimum, Loma Linda encourages baseline conservation efforts year-round, regardless of a shortage emergency.
• Stage I: Normal Conditions - Voluntary Conservation Measures. Normal conditions shall be in effect when Loma Linda is able to meet all the water demands of its customers in the immediate future. During normal conditions, all water users should continue to use water wisely, to prevent the waste or unreasonable use of water, and to reduce water consumption to the amount necessary for ordinary domestic and commercial purposes.
• Stage II: Threatened Water Supply Shortage. In the event of a threatened water supply shortage which could affect Loma Linda’s ability to provide water for ordinary domestic and commercial uses, the City Council shall hold a public hearing at which consumers of the water supply shall have the opportunity to protest and to present their respective needs to Loma Linda. The City Council may then, by resolution, declare a City of Loma Linda
Water Shortage Contingency Plan 7
water shortage condition to prevail, and the selected shortage response actions shall be in effect.
• Stage III: Water Shortage Emergency - Mandatory Conservation Measures. In the event of a water shortage emergency in which Loma Linda may be prevented from meeting the water demands of its customers, the City Council shall, if possible given the time and circumstances, immediately hold a public hearing at which customers of Loma Linda shall have the opportunity to protest and to present their respective needs to the City Council. No public hearing shall be required in the event of a breakage or failure of a pump, pipeline, or conduit causing an immediate emergency. The Director of Public Services is empowered to declare a water shortage emergency, subject to the ratification of the City Council within seventy-two hours of such a declaration.

The CWC outlines six standard water shortage stages that correspond to a shortage compared to normal year availability. The six standard water shortage stages correspond to progressively increasing estimated shortage conditions (up to 10-, 20-, 30-, 40-, 50-percent, and greater than 50-percent shortage compared to the normal reliability condition) and align with the response actions that a water supplier would implement to meet the severity of the impending shortages.

The CWC allows suppliers with an existing WSCP that uses different water shortage stages to comply with the six standard stages by developing and including a cross-reference relating its existing shortage categories to the six standard water shortage stages. Loma Linda is maintaining the current three shortage stages for this WSCP. A crosswalk defines how Loma Linda’s current water shortage stages will align with the DWR’s standardized 6 stages of shortage. A visual representation of this alignment is shown in Figure 2 and Table 1.

Figure 2: Crosswalk to DWR Six Standard Stages
City of Loma Linda
Water Shortage Contingency Plan 8
Table 2: DWR 8-1 Water Shortage Contingency Plan Stages DWR

STANDARD

SHORTAGE
LEVELS

DWR PERCENT

SHORTAGE
RANGE LOMA LINDA’S SHORTAGE LEVEL

LOMA LINDA

PERCENT

SHORTAGE
RANGE
1 Up to 10% Normal Conditions (Loma Linda Stage 1) Up to 10% 2 Up to 20% Threatened Water Supply Shortage (Loma Linda Stage 2) Up to 25% 3 Up to 30% Threatened Water Supply Shortage (Loma Linda Stage 2) Up to 25% 4 Up to 40% Water Shortage Emergency (Loma Linda Stage 3) >50% 5 Up to 50% Water Shortage Emergency (Loma Linda Stage 3) >50% 6 >50% Water Shortage Emergency (Loma Linda Stage 3) >50% Note: One stage in the Water Shortage Contingency Plan must address a water shortage of 50%.

4.0 Shortage Response Actions
This section was completed pursuant to CWC Section 10632(a)(4) and 10632.5(a) and describes the response actions that may be implemented for each stage to minimize social and economic impacts to the community.

In accordance with CWC 10632(b), Loma Linda analyzes and defines water features that are artificially supplied with water, including ponds, lakes, waterfalls, and fountains, separately from swimming pools and spas.

4.1 Supply Augmentation
Table 3 identifies the supply augmentation actions Loma Linda can take in the event of a water shortage condition. Loma Linda currently maintains interconnections with the City of Redlands and the City of San Bernardino. During water shortage emergencies, Loma Linda may be able to obtain supplemental water supply through these connections, if available.

City of Loma Linda
Water Shortage Contingency Plan 9
Table 3: DWR 8-2R Supply Augmentation & Other Actions

SHORTAGE
STAGE

SUPPLY AUGMENTATION

METHODS AND OTHER

ACTIONS BY WATER

SUPPLIER

HOW MUCH IS THIS

GOING TO REDUCE

THE SHORTAGE
GAP?

ADDITIONAL EXPLANATION OR

REFERENCE
3 Other purchases 0-100% Emergency connection with the City of Redlands
3 Other purchases 0-100% Emergency supply connection with the City of San Bernardino

4.2 Demand Reduction
In addition to prohibitions on end uses, Loma Linda offers various programs to encourage conservation. Loma Linda has a water rate structure that promotes water efficiency. The reduction goal is to balance supply and demand. Table 4 summarizes these efforts and end use prohibitions.

City of Loma Linda
Water Shortage Contingency Plan 10
Table 4: DWR 8-3R Demand Reduction Actions

SHORTAGE
LEVEL
DEMAND

REDUCTION

ACTIONS

HOW MUCH IS

THIS GOING TO

REDUCE THE
SHORTAGE GAP? ADDITIONAL EXPLANATION OR REFERENCE

PENALTY,

CHARGE, OR
OTHER

ENFORCEMENT
All Expand Public
Information Campaign
0-20% No
2 Other 0-20% Commercial and industrial facility education on water use. No 2 CII - Restaurants may
only serve water upon
request
0-1% Restaurants are requested not to provide drinking water to patrons except by request.

Yes
2 Landscape - Limit
landscape irrigation
to specific days
5-10% Upon notice and public hearing, Loma Linda may determine that the irrigation of exterior vegetation shall be conducted only during specified hours and/or days and may impose other restrictions on the use of water for such irrigation. The irrigation of exterior vegetation at other than these times shall be considered a waste of water.

Yes
2 Landscape - Limit
landscape irrigation
to specific times
5-10% Public and private parks, golf courses, swimming pools, and school grounds which use water provided by Loma Linda shall use water for irrigation and pool filling between the hours of 6 P.M. and 6 A.M.

Yes
2 Landscape - Other
landscape restriction
or prohibition
0-5% Persons receiving water from Loma Linda who are engaged in commercial agricultural practices, whether for the purpose of crop production or growing of ornamental plants shall provide, maintain, and use irrigation equipment and practices which are the most efficient possible. Upon the request of the director of public services, these persons may be required to prepare a plan describing their irrigation practices and equipment, including but not limited to, an estimate of the efficiency of the use of water on their properties.

Yes
City of Loma Linda
Water Shortage Contingency Plan 11

SHORTAGE
LEVEL
DEMAND

REDUCTION

ACTIONS

HOW MUCH IS

THIS GOING TO

REDUCE THE
SHORTAGE GAP? ADDITIONAL EXPLANATION OR REFERENCE

PENALTY,

CHARGE, OR
OTHER

ENFORCEMENT
2 Landscape - Other
landscape restriction
or prohibition
0-5% Commercial and industrial facilities shall, upon request of the director of public services, provide Loma Linda with a plan to conserve water at their facilities. Loma Linda will provide these facilities with information regarding the average monthly water use by the facility for the last two-year period. The facility will be expected to provide Loma Linda with a plan to conserve or reduce the amount of water used by that percentage deemed by the City Council to be necessary under the circumstances. After review and approval by the director of public services, the water conservation plan shall be considered subject to inspection and enforcement by Loma Linda.

Yes
2 Landscape - Restrict
or prohibit runoff
from landscape
irrigation
0-5% No customer of Loma Linda or other person acting on behalf of or under the direction of a customer shall cause or permit the use of water for irrigation of landscaping or other outdoor vegetation, plantings, lawns or other growth, to exceed the amount required to provide reasonable or excessive waste of water from such irrigation activities or from watering devices or systems. The free flow of water away from an irrigated site shall be presumptively considered excessive irrigation and waste as defined.

Yes
2 Other - Prohibit use
of potable water for
washing hard surfaces
0-1% No water provided by Loma Linda shall be used for washing down impervious areas without specific written authorization of the director of public services. Any water used on all premises that is allowed to escape the premises and run off into gutters or storm drains shall be considered a waste of water.

Yes
2 Other - Require
automatic shut off
hoses
0-1% The washing of cars, trucks, or other vehicles is not permitted, except with a hose equipped with an automatic shut-off device, or at a commercial facility designated and so designated on Loma Linda’s billing records.

Yes
2 Pools and Spas -
Require covers for
pools and spas
0-1% All residential, public, and recreational swimming pools, of all sizes, shall use evaporation-resistant covers and shall recirculate water. Any swimming pool which does not have a cover installed during periods of non-use shall be considered a waste of water.

Yes
City of Loma Linda
Water Shortage Contingency Plan 12

SHORTAGE
LEVEL
DEMAND

REDUCTION

ACTIONS

HOW MUCH IS

THIS GOING TO

REDUCE THE
SHORTAGE GAP? ADDITIONAL EXPLANATION OR REFERENCE

PENALTY,

CHARGE, OR
OTHER

ENFORCEMENT
3 CII - Restaurants may
only serve water upon
request
0-1% Restaurants shall not serve drinking water to patrons except by request.

Yes
3 Landscape - Prohibit
all landscape
irrigation
10-30% Watering of parks, school grounds, golf courses, lawn watering, and landscape irrigation is prohibited.

Yes
3 Landscape - Prohibit
certain types of
landscape irrigation
10-30% Commercial nurseries shall discontinue all watering and irrigation.

Watering of livestock is permitted, as necessary.

Yes
3 Other - Prohibit use
of potable water for
construction and dust
control
0-1% No new construction meter permits shall be issued by Loma Linda. All existing construction meters shall be removed and/or locked.

Yes
3 Other - Prohibit use
of potable water for
washing hard surfaces
0-1% Washing down of driveways, parking lots or other impervious surfaces is prohibited.

Yes
3 Other - Prohibit
vehicle washing
except at facilities
using recycled or
recirculating water
0-1% Washing of vehicles, except when done by commercial car wash establishments using only recycled or reclaimed water is prohibited.

Yes
3 Water Features -
Restrict water use for
decorative water
features, such as
fountains
0-1% Filling or adding water to wading pools, ornamental ponds, fountains, and artificial lakes are prohibited.

Yes
3 Other water feature
or swimming pool
restriction
0-1% Filling or adding water to swimming pools and spas is prohibited. Yes City of Loma Linda
Water Shortage Contingency Plan 13

4.3 Operational Changes and Additional Mandatory
Restrictions
During shortage conditions, operations may be affected by supply augmentation or demand reduction responses. Loma Linda will consider their operational procedures when it completes its Annual Assessment. Any additional mandatory restrictions implemented in response to the declaration of a shortage response stage, beyond the actions listed in Table 3 and Table 4, are listed in Loma Linda’s Ordinance 443 and Municipal Code Title 13 in Chapter 13.32 Waterefficient Landscape provided in Attachment 1.

4.4 Emergency Response Plan
In 2021, Loma Linda completed a Risk and Resilience Assessment (RRA) and Emergency Response Plan (ERP) in accordance with America’s Water Infrastructure Act (AWIA) of 2018.

The purpose of the RRA and ERP is to meet the AWIA compliance requirements and plan for long-term resilience of Loma Linda’s infrastructure. The RRA will assess Loma Linda’s water system to identify critical assets and processes that may be vulnerable to human and natural hazards, and to identify measures that can be taken to reduce risk and enhance resilience from service disruption for the benefit of customers. The RRA identifies and characterizes both infrastructure-specific and system-wide vulnerabilities and threats and quantifies the consequences of disruption. The RRA also identifies various options (and constraints) in addressing and mitigating risk. The RRA, in conjunction with the ERP, charts a course for water system resilience. The RRA also provided various recommendations to increase the reliability of Loma Linda’s system. Since critical pieces of infrastructure and specific vulnerabilities are detailed in the RRA and ERP, the contents of the document are confidential and for use by Loma Linda’s staff only. However, Loma Linda can confirm that these plans meet the requirements set forth by AWIA and evaluate seismic risks and mitigation actions to Loma Linda’s infrastructure.

In the event of a water shortage emergency resulting from equipment failure, power outage, or other catastrophe, Loma Linda is prepared to purchase emergency water supplies from nearby agencies while repairs or other remedial actions are underway. Loma Linda may also implement its three-stage plan for conservation, as described above, with either voluntary or mandatory reductions depending on the severity of the shortage. For severe disasters (Stage 3), mandatory water use reductions are specified.

4.5 Seismic Risk Assessment and Mitigation Plan
Disasters, such as earthquakes, can and will occur without notice. In order to prepare for seismic disasters Loma Linda has assessed the seismic risk and reliance of Loma Linda’s water facilities in the RRA mentioned in the section above.

City of Loma Linda
Water Shortage Contingency Plan 14

4.6 Shortage Response Action Effectiveness
Loma Linda has estimated the effectiveness of shortage response actions in Table 3 and Table 4 when data pertaining to such actions is available. It is expected that response actions effectiveness is also a result of successful communication and outreach efforts.

5.0 Communication Protocols
Loma Linda prioritizes effective communication, especially in times of a water shortage emergency. Loma Linda has a protocol in place to communicate with the public, government agencies, and other interested parties about water shortages and any anticipated or triggered shortage response actions. Communication methods may include email, bill inserts, handouts, informative flyers, direct mail pieces to newspapers, bus shelter advertisements, news releases, social media outreach, and website content. The City also has detailed a process to notify entities and public officials in the event of a water shortage in its Emergency Notification Plan which was updated in March 2024. Loma Linda provides reminders about shortage stages as they develop and encourages conservation at all times.

6.0 Compliance and Enforcement
Penalties and charges for excessive use are the heart of Ordinance 443 and the strongest incentive for conservation among the users. Service may be terminated to any customer who knowingly and willfully violates any provision of the WSCP and Ordinance 443. In addition, civil action penalties by Loma Linda can be enacted as summarized below:
• First Violation – Issuance of written notice of violation of water user. • Second Violation – A $100 surcharge is imposed on the water meter. • Third Violation – A $200 surcharge and/or installation of a flow restrictor on the water meter.
• Subsequent Violations – Discontinuance of service.

The director of public services may grant permits for uses of water otherwise prohibited under the provisions of this chapter if they find and determine that restrictions herein would either:
• Hardship. Cause an unnecessary and undue hardship to the water user or the public; or • Emergency. Cause an emergency condition affecting the health, sanitation, fire protection, or safety of the water use or of the public (Ord. 443 § 1, 1991).

City of Loma Linda
Water Shortage Contingency Plan 15
Such exceptions may be granted only upon written application. Upon granting such an exception permit, the director of public services may impose any conditions they determine to be just and proper. (Ord. 443 § 1, 1991)
Any customer or property owner against whom a penalty is levied pursuant to this chapter shall have a right to a hearing, in the first instance by the director of public services, with the right of appeal to the city council, on the merits of the alleged violation upon the written request of that customer within fifteen days of the date of alleged violation. At the next regularly scheduled meeting, the customer may then appear and present any evidence in support of his position and ask for a decision by the city council. (Ord. 443 § 1, 1991)

7.0 Legal Authority
Loma Linda’s Ordinance 443 (Municipal Code Title 13 in Chapter 13.04.940 to 13.04.1070), provided in Attachment 1, provides exceptions under certain circumstances, establishes enforcement provisions, defines the methods for declaring and terminating water conservation stages, and includes the form of notices and decisions of the City Council.

7.1 Declaration of Water Shortage
In accordance with CWC Section Division 1, Section 350, the City Council shall declare a water shortage emergency condition to prevail within the area served by such distributor whenever it finds and determines that the ordinary demands and requirements of water consumers cannot be satisfied without depleting the water supply of the distributor to the extent that there would be insufficient water for human consumption, sanitation, and fire protection.

7.2 Proclamation of Local Emergency
If a water shortage is approaching, Loma Linda shall coordinate with any of the cities and counties in its service area for the possible proclamation of a local emergency.

8.0 Financial Consequences of WSCP
Implementation
To ensure Loma Linda customers comply with Ordinance 443 and CWC Chapter 3.3 (Excessive Residential Water Use During Drought), additional costs may be incurred to monitor and enforce response actions. The incurred cost may vary depending on the shortage stage and duration of the water shortage emergency.

City of Loma Linda
Water Shortage Contingency Plan 16
If the various stages set forth in Loma Linda’s WSCP are initiated, revenues will be impacted by reduced water sales. In order to minimize the financial impact this would have on Loma Linda, the monthly fixed revenues (monthly meter charges) need to cover the majority of the fixed costs of Loma Linda's water system during such an event. The fixed costs are incurred by Loma Linda regardless of how much or when it delivers water to the customer. These costs generally include administration, personnel, billing, testing, maintenance, meter maintenance, pipeline and facility replacements. Expenditures during periods of drought may be impacted by additional staffing or advertising costs. Expenses such as capital improvements may be deferred during this reduction in sales when feasible.

To mitigate the financial impacts of a water shortage, Loma Linda maintains excess funds in the Water Enterprise Fund (Fund). This Fund is used for all operations associated with the running of the water system. Part of the Fund can be used to stabilize rates during periods of water shortage or disasters affecting the water supply.

Even with the additional monies in the Fund, rate increases may be necessary during a prolonged water shortage. Loma Linda may wish to increase the fixed monthly meter service charge to cover the shortfall in revenue resulting from the decrease in water sales during a water shortage. The additional revenue would help to cover any increased operating and water expenses that occur.

9.0 Monitoring and Reporting
During a water shortage, Loma Linda’s Director of Public Services will monitor the supply and demand for water on a daily basis to determine the shortage response actions required by the implementation or termination of a WSCP stage and will notify the City Council of the necessity for the implementation or termination of a stage if a change in shortage conditions occurs. Each declaration of the City Council implementing or terminating a water conservation stage shall be published at least once in a newspaper of general circulation and shall be posted at the City's offices.

In normal water supply conditions, production figures are recorded daily. Totals are recorded daily on a continuous computerized monitoring system to the Water Department Superintendent. Totals are reported monthly to the City Administrator and incorporated into the water supply report to the Utilities Commission.

During a Stage 2 and Stage 3 water shortage, daily production figures will be reported to the Water Department Supervisor. The Water Department Super intendent compares daily production to the target daily production to verify that the reduction goal is being met. Reports are forwarded to the City Administrator on an as-needed basis, continuously if appropriate.

Monthly reports are sent to the Utility Commission. If reduction goals are not met, the Administrator will notify the City Council so that additional action can be taken.

City of Loma Linda
Water Shortage Contingency Plan 17
During a disaster shortage, the City Administrator will report continuously to the City Council and inform the San Bernardino County Office of Emergency Services. Special Council meetings can be convened should authorization for special actions be needed.

10.0 WSCP Refinement Procedures
The WSCP is best prepared and implemented as an adaptive management plan. Loma Linda will use results obtained from their monitoring and reporting program to evaluate any needs for revisions. Potential changes to the WSCP that would warrant an update include, but are not limited to, any changes to trigger conditions, changes to the shortage stage structure, and/or changes to shortage response actions.

Any prospective changes to the WSCP would need to be presented to Loma Linda’s City Council for discretionary approval. Once discretionary approval has been granted, Loma Linda will hold a public hearing, obtain any comments, and adopt the updated WSCP. Notices for refinement and the public hearing date will be published in the local newspaper in advance of any public meetings.

11.0 Plan Adoption, Submittal, and
Availability
Loma Linda adopted this WSCP with the 2025 RUWMP. The 2025 RUWMP and WSCP were made available for public review in May 2026, and a public hearing was held on June 9, 2026, to receive public input on the draft 2025 RUWMP and the WSCP.

The Loma Linda City Council adopted the 2025 RUWMP and the WSCP at a public meeting on June 9, 2026. The resolution of adoption is included as Attachment 2.

This WSCP was submitted to DWR through the WUEData portal before the deadline of July 1, 2026.

This WSCP will be available to the public on the City of Loma Linda website.

If Loma Linda identifies the need to amend this WSCP, it will follow the same procedures for notification to cities, counties, and the public as used for the 2025 RUWMP and for initial adoption of the WSCP.

City of Loma Linda References
Water Shortage Contingency Plan 18
References
California Department of Water Resources. (2026). 2025 Urban Water Management Plan Guidebook. Sacramento: California Department of Water Resources.

Texas Living Waters Project. (2018). Water Conservation by the Yard: A Statewide Analysis of Outdoor Water Savings Potential. Austin: Texas Living Waters Project, Sierra Club, National Wildlife Federation. Retrieved from Texas Living Waters Project.

United States Environmental Protection Agency, Office of Water. (2002). Cases in Water Conservation: How Efficiency Programs Help Water Utilities Save Water and Avoid Costs. United States Environmental Protection Agency.

City of Loma Linda Attachment 1
Water Shortage Contingency Plan 19
Attachment 1
City of Loma Linda Ordinance 443 & Municipal Chapter

13.32 1

Loma Linda Municipal Code
Up Previous Next Main Collapse Search Print No Frames
Title 13 WATER AND SEWERS
Chapter 13.04 WATER DEPARTMENT
Note
*    Prior ordinance history: Ords. 1, 294, 286 and 333.

13.04.010 Short title.

This chapter shall be known and may be cited as the “utility services division (water) of the community services department” of the city. (Ord. 443 § 1, 1991)

13.04.020 Definitions.

As used in this chapter:

A.     Words and Phrases. For the purpose of this chapter, all words used in the present tense shall include the future; all words in the plural number shall include the singular number; and all words in the singular number shall include the plural number.

B.      “City council” means the city council of the city of Loma Linda, California. All decisions of the city manager and city staff may be appealed to the city council pursuant to Section 2.08.030.

C.      “City staff” means the employees and contract representatives of the city who are appointed to administer and operate the water system of the city.

D.     “Connection” means the pipe line and appurtenant facilities such as the curb stop, meter and meter box, all used to extend water service from the main to premises, the laying thereof and the tapping of the main. Where services are divided at the curb or property line to serve several customers, each such branch service shall be deemed a separate service.

E.      “Cost” means the cost of labor, material, transportation, supervision, engineering, and all other necessary overhead expense.

F.      “Cross-connection” means any physical connection between the piping system from the division’s service and that of any other water supply that is not, or cannot be, approved as safe and potable for human consumption, whereby water from the unapproved source may be forced or drawn into the utility services division (water) distribution mains.

G.     “Main” means a water pipe line in a street, highway, alley, or easement used for public and private fire protection and for general distribution of water.

H.     “Owner” means the person owning the fee, or the person in whose name the legal title to the property appears, by deed duly recorded in the county recorder’s office, or the person in possession of the property or buildings under claim of, or exercising acts of ownership over same for himself, or as executor, administrator, guardian or trustee of the owner.

I.       “Person” means an individual or a company, association, copartnership or public or private corporation.

J.       “Premises” means a lot or parcel of real property under one ownership, except where there are welldefined boundaries or partitions such as fences, hedges, or other restrictions preventing the common use of the property by the several tenants, in which case each portion shall be deemed separate premises. Apartment houses and office buildings may be classified as single premises.

K.     “Private fire protection service” means water service and facilities for building sprinkler systems, hydrants, hose reels and other facilities installed on private property for fire protection and the water available therefor.

L.      “Public fire protection service” means the service and facilities of the entire water supply, storage and distribution system of the division, including the fire hydrants affixed thereto, and the water available for fire protection, excepting house service connections and appurtenances thereto.

M.     “Regular water service” means water service and facilities rendered for normal domestic, commercial and industrial purposes on a permanent basis, and the water available therefor.

N.     “Temporary water service” means water service and facilities rendered for construction work and other uses of limited duration, and the water available therefor.

O.     “Utility services division (water)” means division operated under the jurisdiction of the city council represented by appropriate employees or agents. (Ord. 443 § 1, 1991)

13.04.030 Notice—To customers.

Notices to customers by the division will normally be given in writing and either delivered or mailed to him at his last known address. Where conditions warrant, and in emergencies, the utility services division (water) may resort to notification either by telephone or messenger. (Ord. 443 § 1, 1991)

13.04.040 Notice—From customers.

Notices from customers to the utility services division (water) may be given by the customer or his authorized representative in writing, in person or by mail at the division’s office. (Ord. 443 § 1, 1991)

13.04.050 Authority of public services director.

The public services director shall have full charge and control of the maintenance, operation and construction of the water works and water distribution system of the district. The public services director shall regularly inspect all physical facilities related to the city water system, to see that they are in good repair and proper working order, and to note and report violations of any ordinances or water regulations. (Ord. 443 § 1, 1991)

13.04.060 Supervisory employees designated.

The supervisory employees of the utility services division (water) shall consist of public services director and a utility services superintendent. (Ord. 443 § 1, 1991)

13.04.070 Administrative powers and duties.

Regular inspection of all physical facilities belonging and related to the city water system to ensure they are in good repair and proper working order and to note violations of any water regulations. The public services director or his designee shall have charge of other employees working under his direct supervision, particularly relating to the repair and maintenance of the water system and the reading of customer meters. He shall report and be responsible to the city manager in all matters pertaining to the operation of the utility services division (water). In the event of an emergency requiring immediate action, he shall take whatever steps are necessary to maintain customer service pending further action by the city manager, if any.

Supervision of all repair or construction work authorized by the city council and any other duties prescribed elsewhere in this chapter or which shall, after the effective date of the ordinance codified in this chapter, be prescribed by the rules and regulations of the city council are the responsibility of the public services director or his designee. (Ord. 443 § 1, 1991)

13.04.080 Delegation of utility services.

In the absence of the public services director, the duties set forth may be performed by another employee who may be designated by the public services director to perform such duties. (Ord. 443 § 1, 1991)

13.04.090 Department to furnish system.

The city will furnish a system, plant, and works used for and useful in obtaining, conserving and disposing of water for public and private uses, including all appurtenances to it, and lands, easements, rights in land, water rights, contract rights, franchises, and other water supply, storage and distribution facilities and equipment, including but not limited to private and public developed projects both on-site and off-site. (Ord. 443 § 1, 1991)

13.04.100 Acceptance of conditions required.

All applicants for service connections or water service shall be required to accept such conditions of pressure and services as are provided by the distributing system at the location of the proposed service connection, and to hold the city harmless for any damages arising out of low pressure or high pressure conditions or interruptions in service. (Ord. 443 § 1, 1991)

13.04.110 Department not responsible for pressure.

The city shall not accept any responsibility for the maintenance of pressure, and it reserves the right to discontinue service while making emergency repairs, etc. Consumers dependent upon a continuous supply of water should provide their own emergency storage. (Ord. 443 § 1, 1991)

13.04.120 Valve operation restricted to department.

No one except an employee or representative of the utility services division (water) shall at any time in any manner operate the curb cocks or valves, except for repair on private property or to avoid property damage, main cocks, gates or valves of the city’s water system or interfere with meters or their connections, street mains or other parts of the water system. (Ord. 443 § 1, 1991)

13.04.130 Service discontinuance authorized for noncompliance.

For the failure of the customer or his agent to comply with all or any part of this chapter and any ordinance, resolution, or order fixing rates and charges of the city’s utility service division (water), the customer’s service shall be discontinued, and water shall not be supplied such customer until he shall have complied with the rule or regulation which he has violated or paid the rates or charges made against him for services rendered. This section shall be in addition to any other remedies authorized by law. (Ord. 443 § 1, 1991)

13.04.140 Division right to determine connection size and location.

The utility services division (water) reserves the right to determine the size of service connections and their location with respect to the boundaries of the premises to be served. The laying of consumer’s pipe line to the curb should not be done until the location of the service connection has been approved by the utility services division (water) superintendent. (Ord. 443 § 1, 1991)

13.04.150 Curb cock or valve required.

Every service connection installed by the utility services division (water) shall be equipped with a curb cock or ball valve on the inlet side of the meter. Such valve or curb cock is intended for the exclusive use of the utility services division (water) in controlling the water supply through the service connection pipe. If the curb cock or valve is damaged by the consumer’s use to an extent requiring replacement, such replacement shall be at the consumer’s expense. (Ord. 443 § 1, 1991)

13.04.160 Service connection regulations.

Domestic, commercial and industrial service connections shall conform with the following rules and any deviation therefrom shall be deemed unlawful:

A.     Separate Building. Each house or building under separate ownership must be provided with a separate service connection. Two or more houses under one ownership and on the same lot or parcel of land may be supplied through the same service connection; provided, that for each house under a separate roof which shall face a street, an additional minimum water charge will be applied to the single meter serving the house or a separate service connection may be provided for each building. The city reserves the right to limit the number of houses or the area of land under one ownership to be supplied by one service connection.

B.      Single Connection. Not more than one service connection for domestic or commercial water supply shall be installed for one building, except under special conditions approved by the public services director.

C.      Different Owners. A service connection shall not be used to supply adjoining property of a different owner or to supply property of the same owner across a street or an alley.

D.     Divided Property. When property provided with a service connection is divided, each service connection shall be considered as belonging to the lot or parcel of land which it directly enters.

E.      Service Connections. The service connections extending from the water main to the property line and including the meter, meter box and curb cock or ball valve, shall be maintained by the utility services division (water). All pipes and fixtures extending or lying beyond the meter or seven feet from main whichever is closer shall be installed and maintained by the owner of the property. (Ord. 443 § 1, 1991)

13.04.170 Main extension—Regulations.

The following rules are established for making main extensions:

A.     Any owner of one or more lots or parcels, or a subdivider of a tract of land, desiring the extension of one or more water mains, to serve such property, shall make a written application therefor to the utility services division (water), such application to contain the legal description of the property to be served and tract number thereof, and any additional information which may be required by the city, and be accompanied by a map showing the location of the proposed connections.

B.      Upon receipt of the application, the utility services division (water) shall make an investigation and survey of the proposed extension and shall report the findings to the city council, including the estimated cost of any extensions involving the utility services division (water).

C.      The city council shall thereupon consider the application and report of the utility services division (water) and after such consideration reject or approve the same.

D.     All extensions of mains, fire hydrants, laterals and connections provided for in accordance with this chapter and approved by the city council shall by agreement become and remain the property of the city.

When a contractor or subdivider installs water mains, fire hydrants, laterals and connections in any subdivisions at his own expense, but under the supervision of the utility services division (water), such installations, upon completion and before water service is provided shall be transferred to the ownership of the city by appropriate grant deed and bill of sale.

E.      No dead-end lines shall be permitted, except with the approval of the utility services superintendent, and in cases where circulation lines are necessary they shall be designed and approved by the utility services division (water) in advance of installation before becoming a part of the city system.

F.      The city will provide all main pipe line extensions in existing streets to properties along dedicated roads and streets upon application for water service and if in their opinion such water service is economically feasible and to the advantage of the city system in serving the requirements of the area. The cost of such extension of water mains shall be at the expense of the applicant or group of applicants to be shared by them.

If an applicant could be served adequately by a certain size pipe line to provide for future expansion of water services in the area, the city may agree to share the cost of the pipe lines on terms agreeable to both parties concerned. In the event that a larger pipe line is installed at partial cost to the city, the city may require future water users in the area who apply for new connections to reimburse the utility services division (water) for such main line extension cost until the full amount of the cost has been recovered.

G.     If the property owners or subdividers initiating the pipe line extension are required to defray the entire cost of any main line extension under these regulations, and they wish to put up the entire cost of the project, the city may agree to reimburse such property owners or subdividers over a period of years by requiring all new connections in that area to pay a proportionate amount of the cost to the city, which money shall then be paid to the original investors until the full amount has been paid. (Ord. 443 § 1, 1991)

13.04.180 Independent pipe line systems required when.

The applicant may apply for as many services as may be reasonably required for his premises provided that the pipe line system for each service be independent of the others and that they not be interconnected. (Ord. 443 § 1, 1991)

13.04.190 Wasting water prohibited—Service discontinuance authorized when.

No customer shall knowingly permit leaks or waste water. Where water is wastefully or negligently used on a customer’s premises, seriously affecting the general service, the utility services division (water) may discontinue the service if such conditions are not corrected within five days after giving the customer written notice. (Ord. 443 § 1, 1991)

13.04.200 Facilities department property—Obstruction removal authorized.

All facilities installed by the city on private property for the purpose of rendering water service shall remain the property of the city and may be maintained, repaired or replaced by the utility services division (water) without the consent or interference of the owner or occupant of the property. The owner shall use reasonable care in the protection of the facilities. No payment shall be made for placing or maintaining the facilities on private property. Shrubbery or plants must not be planted adjacent to fire hydrants or water meters. If property owners do not cooperate in this, the city shall have the right to remove such obstructions at the expense of the property owner after giving notice of such intention. (Ord. 443 § 1, 1991)

13.04.210 Customer liability for facilities damage.

The customer shall be liable for any damage to the service facilities when such damage is from causes originating on the premises by an act of the customer or his tenants, agents, employees, contractors, licensees, or permitees, including the breaking or destruction of locks by the customer or others on or near a meter, and any damage to a meter that may result from hot water or steam from a boiler or heater on the customer’s premises. The city shall be reimbursed by the customer for any such damage promptly on presentation of a bill for same. (Ord. 443 § 1, 1991)

13.04.220 Attaching ground wires prohibited.

All individuals or business organizations are forbidden to attach any ground wire or wires to any plumbing which is or may be connected to a service connection or main belonging to the city. The city shall hold the customer liable for any damage to its property occasioned by such ground wire attachments. (Ord. 443 § 1, 1991)

13.04.230 Customer required to provide valve.

The customer shall provide a valve on his side of the service installation, as close to the meter location as practicable, to control the flow of water to the pipe lines on his premises. The customer shall not use the service curb valve to turn meter on and off for his convenience. (Ord. 443 § 1, 1991)

13.04.240 Department right-of-entry.

Representatives from the utility services division (water) shall have the right of ingress and egress to the customer’s premises at reasonable hours for any purpose reasonably connected with the furnishing of water service. (Ord. 443 § 1, 1991)

13.04.250 Unauthorized connection to avoid charges.

A customer, subdivider or their employees or agents shall not make illegal and unauthorized connections to the water system with or without a meter, thus avoiding the record of payment of water charges. (Ord. 443 § 1, 1991)

13.04.260 Meters—Installation—Sealing.

Meters will be installed on or near property lines and shall be owned by the city and installed and removed at its expense. No rent or other remuneration will be paid by the city for a meter or other facilities including connections belonging to individuals. All meters will be sealed by the utility services division (water) at the time of installation, and no seal shall be altered or broken except by one of the utility services division (water) authorized employees or agents. (Ord. 443 § 1, 1991)

13.04.270 Meters—Relocation charges.

Meters moved for the convenience of the customer will be relocated at the customer’s expense. Meters moved to protect the city’s property will be moved at its expense. If the lateral distance which the customer desires to have the meter moved exceeds eight feet, he will be required to pay for new service at the desired location. (Ord. 443 § 1, 1991)

13.04.280 Service discontinuance authorized for cross-connection.

Water service may be refused or discontinued to any premises where there exists a cross-connection in violation of state or federal laws. (Ord. 443 § 1, 1991)

13.04.290 Service discontinuance—Fraud or abuse.

Service may be discontinued if necessary to protect the city against fraud or abuse. (Ord. 443 § 1, 1991)

13.04.300 Service discontinuance—Noncompliance.

Service may be discontinued for noncompliance with this chapter or any other ordinance or regulation relating to the water service. (Ord. 443 § 1, 1991)

13.04.310 Water service application—Form.

A property owner or his agent may make application for regular water service on a form provided by the utility services division (water). Such application shall signify the customer’s willingness and intention to comply with this chapter and other ordinances or regulation relating to the regular water service and to make payment for the water service received. (Ord. 443 § 1, 1991)

13.04.320 Water service application—Payment of past service required.

An application for water service will not be honored unless payment in full has been made for water service previously rendered to the applicant within the boundaries of the division. (Ord. 443 § 1, 1991)

13.04.330 Connection charges—Installation by authorized personnel.

A.     Where a regular charge has been fixed for the type of service connection desired, such regular charges shall be paid in advance by the applicant. Where there is no regular fixed charge, the city reserves the right to require the applicant to deposit an amount equal to the estimated cost of such service connection. The current schedule of regular service connection charges is in resolution form.

B.      Only duly authorized employees or agents of the utility services division (water) will be authorized to install service connections. (Ord. 443 § 1, 1991)

13.04.340 Service installation—Main abutment required.

Regular water services will be installed at the location desired by the applicant, of the size determined by the utility services division (water). Service installation will be made only to property abutting on distribution mains as have been constructed in public streets, alleys or easements, or to extensions thereof as provided in this chapter. Service installed in new subdivisions prior to the construction of streets or in advance of street improvements must be accepted by the applicant in the installed location. (Ord. 443 § 1, 1991)

13.04.350 Service requirements changes—Notice required.

Customers making any material change in the size, character or extent of the equipment or operations utilizing water services, or whose change in operations results in a large increase in the consumption of water, shall immediately give the utility services division (water) written notice of the nature of the change and, if necessary, amend or change their original application. (Ord. 443 § 1, 1991)

13.04.360 Subdivision system application—Required.

A person or persons desiring to provide a water system within a tract of land which he proposes to subdivide, shall make written application therefor. (Ord. 443 § 1, 1991)

13.04.370 Subdivision system application—Contents.

The application shall state the number of the tract, the name of the subdivision, and its location. It shall be accompanied by a copy of the final map and of the plans, profiles and specifications for the street work therein. (Ord. 443 § 1, 1991)

13.04.380 Subdivision system—Compliance required.

If approved by the city council, it shall be required that the subdivider shall meet all specifications set forth by the American Water Works Association and city standards and specifications as to adequate size, type and quality of materials used and the location of main lines, valves, connections, fire hydrants, etc., and comply with all requirements of the State Health Department and the department of public safety (fire division). (Ord. 443 § 1, 1991)

13.04.390 Subdivision system—Subdivider responsibility—Division inspection.

The utility services division (water) will not undertake on its own initiative to provide or construct any main extension pipe lines in a subdivision or for the extension of main lines from existing pipe lines to the subdivision area. Such subdivision main lines and service required, together with any extension of existing pipe lines to such area, shall be the responsibility of and at the expense of the subdivider. He shall provide and arrange for the construction of all main lines, valves, connections and hydrants with laterals to the inside of curb. Upon completion of the construction project, the system shall be inspected by utility services and if approved, the subdivider shall be required to obtain final approval of the city engineer. Upon such approval, the subdivider shall be required to transfer his ownership in the mains, valves, fire hydrants, laterals, connections, etc., to the city before any regular water service shall be supplied to the subdivided tract or area. (Ord. 443 § 1, 1991)

13.04.400 Subdivision system—Division payment for larger main installation.

If the city council shall require a subdivider or other person to install a larger size main pipe line than that which would normally be required or necessary to serve the interests of the subdivider or others, by consent and written agreement between the subdivider or others and the city council, the utility services division (water) may agree to pay for the difference in cost between the small size main pipe line and the large one which is deemed necessary and desirable for future expansion of the system. All final agreements must be approved and ratified by the city council. (Ord. 443 § 1, 1991)

13.04.410 Department right to set meter—Consumer liability for negligence.

The utility services division (water) reserves the right to set and maintain a meter on any service connection. The water consumer shall be held liable, however, for any damage to the meter due to customer’s negligence or carelessness and in particular, for damage caused by hot water or steam from the premises. (Ord. 443 § 1, 1991)

13.04.420 Guarantee deposit required when.

All water customers who are renters, subdividers or builders subject to frequent change of customers shall be required to make a guarantee deposit set by resolution per connection returnable or applicable to the last or closing bill. (Ord. 443 § 1, 1991)

13.04.430 Temporary service—Connection discontinuance.

Temporary service connections shall be discontinued and terminated within six months after installation unless an extension of time is granted in writing by the utility services division (water). (Ord. 443 § 1, 1991)

13.04.440 Temporary service—Cost deposit required—Connection charges.

The applicant shall deposit, in advance, the estimated cost of installing and removing the facilities required to furnish the service exclusive of the cost of salvageable material. Upon discontinuance of service, the actual cost shall be determined and an adjustment made as an additional charge, refund or credit. If service is supplied through a fire hydrant, the applicant will be charged as per resolution. (Ord. 443 § 1, 1991)

13.04.450 Temporary service—Facilities operation.

All facilities for temporary service to the customer connection shall be made by the utility services division (water) and shall be operated in accordance with its instructions. (Ord. 443 § 1, 1991)

13.04.460 Temporary service—Meter responsibility.

The customer shall use all possible care to prevent damage to the meter or to any other loaned facilities of the utility services division (water) which are involved in furnishing the temporary service from the time they are installed until they are removed, or until forty-eight hours’ notice in writing has been given to the utility services division (water) that the contractor or other person is through with the meter or meters and the installation. If the meter or other facilities are lost or damaged, the cost of the meter or cost of making repairs shall be paid by the customer. (Ord. 443 § 1, 1991)

13.04.470 Temporary service—Hydrant use regulations.

An applicant for temporary use of water from a fire hydrant must secure a permit therefor from the utility services division (water) and pay the regular fee charged for the installation and removal of a meter to be installed on the hydrant, provide himself with a hydrant wrench necessary to operate such hydrant, and pay for the water used in accordance with the meter readings, at the rates prescribed by resolution. (Ord. 443 § 1, 1991)

13.04.480 Tampering with hydrant prohibited.

Tampering with any fire hydrant for the unauthorized use of water therefrom, or for any other purpose, is punishable by law. (Ord. 443 § 1, 1991)

13.04.490 Temporary service—Advance payment or credit references required.

The applicant shall pay the estimated cost of water service in advance or shall be otherwise required to establish acceptable credit references. (Ord. 443 § 1, 1991)

13.04.500 Arrangements for large quantities of water required.

When an abnormally large quantity of water is desired for filling a swimming pool or for other purposes, arrangements must be made with the utility services division (water) prior to taking such water. Permission to take water in unusual quantities will be given only if it can be safely delivered through the city’s facilities and if other consumers are not inconvenienced thereby. (Ord. 443 § 1, 1991)

13.04.510 Equipment maintenance required.

The customer shall, at his own risk and expense, furnish, install and keep in good and safe condition all equipment that may be required for receiving, controlling, applying and utilizing water, and the city shall not be responsible for any loss or damage caused by the improper installation of such equipment, or the negligence or wrongful act of the customer or of any of his tenants, agents, employees, or contractors, licensees or permittees in installing, maintaining, operating or interfering with such equipment. The city shall not be responsible for and will not consider refunds or credits for the loss or wastage of water occasioned by the breakage, leakage or damage to pipe lines on customer’s property which is beyond the customer’s water meter. The city also shall not be responsible for damage to property caused by faucets, valves and other equipment that are open when water is turned on at the customer’s meter, either originally or when turned on after a temporary shutoff. (Ord. 443 § 1, 1991)

13.04.520 Collection by suit—Defendant payment of costs.

Defendant shall pay all costs of suit in any judgment rendered in favor of the city. (Ord. 443 § 1, 1991)

13.04.530 Hydrants—Authorized use only permitted.

Fire hydrants are for use by the utility services division (water) or by the department of public safety (fire division). Other parties desiring to use fire hydrants for any purpose must first obtain written permission from the utility services division (water) prior to use and shall operate the hydrant in accordance with instructions issued by the utility services division (water). Unauthorized use of hydrants will be prosecuted according to law. (Ord. 443 § 1, 1991)

13.04.540 Hydrants—Maintenance charge.

A charge, to be determined by contract between the utility services division (water) and organized fire protection agencies will be imposed for hydrant maintenance and water used for public fire protection. (Ord. 443 § 1, 1991)

13.04.550 Hydrants—Change in location.

When a fire hydrant has been installed in the location specified by proper authority, the city has fulfilled its obligation. If a property owner or other party desires a change in the size, type or location of the hydrant, he shall bear all costs of such changes without refund. Any change in the location of a fire hydrant must have the approval of the proper authority. (Ord. 443 § 1, 1991)

13.04.560 Private fire protection—Applicant to pay installation cost.

The applicant for private fire protection service shall pay the total actual cost of installation of the service from the distribution main to the customer’s premises, including the cost of an approved double detector check device as per City Standard W-11. Customer shall be responsible for maintenance and testing of such device and meter at cost. (Ord. 443 § 1, 1991)

13.04.570 Private fire protection—Connection with other systems prohibited.

There shall be no connections between this fire protection system and any other water distribution system on the premises. (Ord. 443 § 1, 1991)

13.04.580 Private fire protection—Fire extinguishing and testing purposes only authorized.

There shall be no water used through the fire protection service except to extinguish fires and for testing the firefighting equipment. (Ord. 443 § 1, 1991)

13.04.590 Private fire protection—Charges double when—Exception.

Any consumption recorded on the meter will be charged for at double the regular service rates, except that no charge will be made for water used to extinguish fires where such fires have been reported to the department of public safety (fire division). (Ord. 443 § 1, 1991)

13.04.600 Private fire protection—Rate determination.

The monthly rates for private fire protection shall be established by the utility services division (water) upon receipt of application. (Ord. 443 § 1, 1991)

13.04.610 Private fire protection—Tank filling authorized when.

Occasionally water may be obtained from a private fire service for filling a tank connected with a fire service, but only if permission is secured from the utility services division (water) in advance and an approved means of measurement is available. The regular water rates will be applied. (Ord. 443 § 1, 1991)

13.04.620 Private fire protection—Service discontinuance authorized when.

If water is used from a private service in violation of the agreement or of this chapter, the city may, at its option, discontinue and remove the service. (Ord. 443 § 1, 1991)

13.04.630 Private fire protection—Department nonresponsibility for damage.

The city assumes no responsibility for loss or damage due to lack of water or pressure, either high or low, and merely agrees to furnish such quantities and pressures as are available in its general distribution system.

The service is subject to shutdowns and variations required by the operation of the system. (Ord. 443 § 1, 1991)

13.04.640 Private fire protection—Other service connections authorized.

The city shall have the right to take a domestic, commercial or industrial service connection from the fire service connection at the curb to supply the same premises as those to which the fire service connection belongs. The city shall also have the right to determine the proportion of the installation costs properly chargeable to each service connection, if such segregation of costs shall become necessary. (Ord. 443 § 1, 1991)

13.04.650 Private fire protection—Check valve installation authorized.

The city reserves the right to install on all fire service connections a double detector check as per City Standard W-11, at the expense of the owner of the property. (Ord. 443 § 1, 1991)

13.04.660 Backflow protective device—Installation required when.

The customer must comply with state and federal laws governing the separation of dual water systems or installations of backflow protective devices to protect the public water supply from the range of crossconnections. Backflow protective devices must be installed as per city standard and shall be open to test and inspection by the utility services division (water). Plans for the installation of backflow protection devices must be approved by the utility services division (water) prior to installation. (Ord. 443 § 1, 1991)

13.04.670 Pressure relief valves required when.

As a protection to the customer’s plumbing system, a suitable pressure relief valve must be installed and maintained by him, at his expense, when check-valves or other protective devices are used. The relief valve shall be installed between the check-valve and the water heater. (Ord. 443 § 1, 1991)

13.04.680 Backflow protective device—Required on supply lines when.

Whenever backflow protection has been found necessary on a water supply line entering a customer’s premises, then any and all water supply lines from the utility services division (water) mains entering such premises, buildings, or structures shall be protected by an approved backflow device, regardless of the use of the additional water supply lines. (Ord. 443 § 1, 1991)

13.04.690 Backflow protective device—Inspection and testing.

The double check valve or other approved backflow protection devices shall be inspected and tested in accordance with the California Administrative Code Title 17 by the utility services division (water) or a certified tester. The devices shall be serviced, overhauled, or replaced whenever they are found defective, and all costs of repair and maintenance shall be borne by the customer. (Ord. 443 § 1, 1991)

13.04.700 Service discontinuance authorized for check valve installation defected.

The service of water to any premises may be immediately discontinued by the utility services division (water) if any defect is found in the check valve installations or other protective devices, or if it is found that dangerous unprotected cross-connections exist. Service will not be restored until such defects are corrected. (Ord. 443 § 1, 1991)

13.04.710 Department nonliability for service interruption damage.

The city shall not be liable for damage which may result from an interruption in service from a cause beyond the control of the utility services division (water). (Ord. 443 § 1, 1991)

13.04.720 Billing—Period.

The regular billing period will be monthly or bimonthly at the option of the utility services division (water). (Ord. 443 § 1, 1991)

13.04.730 Meters—Reading.

Meters will be read as nearly as possible on the same day of each month, as near the end of each month as practicable and reasonably possible. (Ord. 443 § 1, 1991)

13.04.740 Opening and closing bill proration.

Opening and closing bills for less than the normal billing period shall be prorated both as to minimum charges and quantity by blocks of one hundred cubic feet. If the total period for which service is rendered is less than one month, the bill shall not be less than the monthly minimum charge applicable. Closing bills may be estimated by the utility services division (water) for the final period as an expediency to permit the customer to pay the closing bill at the time service is discontinued. (Ord. 443 § 1, 1991)

13.04.750 Charges due when.

Water charges are due and payable within twenty days of billing date to the property owner or his tenant or agency as designated in the application, and delinquent twenty days after the date indicated on the bill. Service may be discontinued without further notice if payment is not made by the delinquent date. (Ord. 443 § 1, 1991)

13.04.760 Billing—Payment due notice required.

Bills for metered water services shall be rendered at the end of each billing period. Flat rate service shall be billed in advance. Bills shall be payable on presentation. On each bill for water service rendered by the utility services division (water) shall be printed substantially as follows: “Payment is due within twenty (20) days of billing date. Service may be turned off if account is unpaid.” (Ord. 443 § 1, 1991)

13.04.770 Billing—Separate bills required—Exception.

Separate bills will be rendered for each meter installation except where the utility services division (water) has, for its own convenience, installed two or more meters in place of one meter. Where such installations are made the meter readings will be combined for billing purposes. (Ord. 443 § 1, 1991)

13.04.780 Payment guarantee required for turn on.

The water charge begins when a service connection is installed and the meter is set, unless the water is ordered to be left shut off when the service connection is ordered to be installed. Before water is turned on by the utility services division (water) for any purpose whatever, the property owner or tenant must sign a form in which he guarantees payment of future water bills for the service required. The person signing the guarantee form or meter set form will be held liable for water used until the utility services division (water) is notified in writing to discontinue service or to transfer the account to another owner or tenant. (Ord. 443 § 1, 1991)

13.04.790 Unauthorized water use—Consumer liability.

A person taking possession of premises and using water from an active service connection without having made application to the utility services division (water) for meter service shall be held liable for the water delivered from the date of the recorded meter reading, and if the meter is found inoperative, the quantity consumed will be estimated. If proper allocation for water service is not made upon notification to do so by the utility services division (water), and if accumulated bills for service are not paid immediately, the service may be discontinued by the utility services division (water) without further notice. (Ord. 443 § 1, 1991)

13.04.800 Department nonliability for wasted water.

When turning on the water supply as requested, and the house or property is vacant, the utility services division (water) will endeavor to ascertain if water is running on the inside of the building. If such is found to be the case, the water will be left shut off at the curb cock on the inlet side of the meter. The utility services division (water) jurisdiction and responsibility ends at the property line for all purposes, and the utility services division (water) will in no case be liable for loss of wasted water or for damages occasioned by water running from open or faulty fixtures, or from broken, leaking or damaged pipes inside of the property line of the customer. (Ord. 443 § 1, 1991)

13.04.810 Desired discontinuance—Notification required.

Customers desiring to discontinue service should so notify the utility services division (water) two days prior to vacating the premises. Unless discontinuance of service is ordered, the customer shall be liable for regular charges whether or not any water is used. (Ord. 443 § 1, 1991)

13.04.820 Collection by suit—Authorized when.

All unpaid rates and charges and penalties provided in this chapter may be collected by suit. (Ord. 443 § 1, 1991)

13.04.830 Service rates.

Each and all premises which are served by a connection to the water system of the city shall be charged and the owner thereof shall pay a water service usage charge based upon a schedule for such charges fixed by resolution duly adopted by the city council. (Ord. 443 § 1, 1991)

13.04.840 Administrative decision appeal—City council action final.

All ruling of the city council shall be final. All administrative decisions of the staff concerning city policies, rules or regulations shall be appealed, if at all, to the city council within ten days subsequent to written notice of such administrative decision; otherwise, the decision shall be deemed final. (Ord. 443 § 1, 1991)

13.04.850 Meter testing—Required when—Procedure.

All meters will be tested prior to installation, and no meter will be installed which registers more than two percent fast. If a customer desires to have the meter serving his premises tested, he shall first deposit the fees required and may be present when the meter is tested in the meter shop of the utility services division (water).

Should the meter register more than two percent fast, the deposit will be refunded, but should the meter register less than two percent fast, the deposit will be retained by the utility services division (water). (Ord. 443 § 1, 1991)

13.04.860 Meter testing—Refund authorized when.

If a meter tested at the request of a customer is found to be more than two percent fast, the excess charges for the time service was rendered the customer requesting the test, or for a period of six months, whichever shall be the lesser, shall be refunded to the customer. (Ord. 443 § 1, 1991)

13.04.870 Meter testing—Additional billing authorized when.

If a meter tested at the request of a customer is found to be more than five percent slow, the utility services division (water) may bill the customer for the amount of the undercharge based upon corrected meter readings for the period, not exceeding six months, that the meter was in use. (Ord. 443 § 1, 1991)

13.04.880 Charge estimate when meter not registering.

If a meter is found to be not registering, the charges for service shall be at the minimum monthly rate or based on the estimated consumption, whichever is greater. Such estimates shall be made from previous consumption records for a comparable period or by such other method as is determined by the utility services division (water) and its decision shall be final. (Ord. 443 § 1, 1991)

13.04.890 Service discontinuance authorized for nonpayment.

Service may be discontinued for nonpayment of bills on or before the twentieth day following the date of billing. (Ord. 443 § 1, 1991)

13.04.900 Failure to receive bill no relief of liability.

Failure to receive a bill for service rendered does not relieve consumer of liability. Any amount due shall be deemed a debt to the city, and any person, firm or corporation failing, neglecting or refusing to pay such indebtedness shall be liable to an action in the name of the city in any court of competent jurisdiction for the amount thereof. (Ord. 443 § 1, 1991)

13.04.910 Reconnection charge—Meter removal charge.

A reconnection charge, plus penalties as per resolution shall be made and collected prior to renewing service following a discontinuance of water service due to nonpayment of bill, and an additional charge shall be made whenever it is deemed necessary to remove the meter from the premises. (Ord. 443 § 1, 1991)

13.04.920 Delinquent charge penalty.

Rates and charges which are not paid on or before the day of delinquency shall be subject to a penalty of ten percent and thereafter shall be subject to a further penalty of two percent per month on the first day of each month following. (Ord. 443 § 1, 1991)

13.04.930 Security deposit charge.

The security deposit is the charge which insures payment of minimum utility service division (water) charges. Upon discontinuance of service the security deposit shall be applied to reduce any unpaid charges outstanding on the customer’s account. The amount of deposit required shall be established by the city council in the resolution on fees. The security deposit shall be refunded to the customer as provided in this section. (Ord. 443 § 1, 1991)

13.04.940 Waste or nuisance water and other substances.

It is unlawful for any person, firm or corporation to deposit, drain, wash, allow to run or divert into or upon any public road, highway, street or alley, drainage ditch, storm drain or flood control channel owned by or controlled by any public agency within the city, any water, mud, or sand; except that, upon written application of any person filed with the city and approved by the director of public services, the city may, upon such terms and conditions as it may deem advisable to impose, including the charging of a fee therefor, grant a permit to such person to do any of the acts prohibited by this section, provided the same shall not be detrimental to the public health, safety or welfare. For purposes of enforcement of this section, the owner of the meter or property which is the source of the waste or nuisance water or other substance as defined in this section is considered the party responsible for any violations cited under this section. (Ord. 443 § 1, 1991)

13.04.950 Conservation measures—Stage No. 1 normal conditions—Voluntary conservation measures.

Normal conditions shall be in effect when the city is able to meet all the water demands of its customers in the immediate future. During normal conditions all water users should continue to use water wisely, to prevent the waste or unreasonable use of water, and to reduce water consumption to that necessary for ordinary domestic and commercial purposes. (Ord. 443 § 1, 1991)

13.04.960 Stage No. 2—Threatened water supply shortage.

In the event of a threatened water supply shortage which could affect the city’s ability to provide water for ordinary domestic and commercial uses, the city council shall hold a public hearing at which consumers of the water supply shall have the opportunity to protest and to present their respective needs to the city. The city council may then, by resolution, declare a water shortage condition to prevail, and the following conservation measures shall be in effect.

A.     Exterior Landscape Plans. Exterior landscape plans for all new commercial and industrial development shall provide for timed irrigation and shall consider the use of drought resistant varieties of flora.

Such plans shall be presented and approved by the city prior to issuance of a water service letter.

B.      Excessive Irrigation and Related Waste. No customer of the city or other person acting on behalf of or under the direction of a customer shall cause or permit the use of water for irrigation of landscaping or other outdoor vegetation, plantings, lawns or other growth, to exceed the amount required to provide reasonable or excessive waste of water from such irrigation activities or from watering devices or systems.

The free flow of water away from an irrigated site shall be presumptively considered excessive irrigation and waste as defined.

C.      Agricultural Irrigation. Persons receiving water from the city who are engaged in commercial agricultural practices, whether for the purpose of crop production or growing of ornamental plants shall provide, maintain and use irrigation equipment and practices which are the most efficient possible. Upon the request of the director of public services, these persons may be required to prepare a plan describing their irrigation practices and equipment, including but not limited to, an estimate of the efficiency of the use of water on their properties.

D.     Commercial Facilities. Commercial and industrial facilities shall, upon request of the director of public services, provide the city with a plan to conserve water at their facilities. The city will provide these facilities with information regarding the average monthly water use by the facility for the last two-year period.

The facility will be expected to provide the city with a plan to conserve or reduce the amount of water used by that percentage deemed by the city council to be necessary under the circumstances. After review and approval by the director of public services, the water conservation plan shall be considered subject to inspection and enforcement by the city.

E.      Parks, Golf Courses, Swimming Pools and School Grounds. Public and private parks, golf courses, swimming pools and school grounds which use water provided by the city shall use water for irrigation and pool filling between the hours of six p.m. and six a.m.

F.      Domestic Irrigation. Upon notice and public hearing, the city may determine that the irrigation of exterior vegetation shall be conducted only during specified hours and/or days, and may impose other restrictions on the use of water for such irrigation. The irrigation of exterior vegetation at other than these times shall be considered to be a waste of water.

G.     Swimming Pool. All residential, public and recreational swimming pools, of all sizes, shall use evaporation resistant covers and shall recirculate water. Any swimming pool which does not have a cover installed during periods of nonuse shall be considered a waste of water.

H.     Runoff and Washdown. No water provided by the city shall be used for the purposes of washdown of impervious areas without specific written authorization of the director of public services. Any water used on a premises that is allowed to escape the premises and run off into gutters or storm drains shall be considered a waste of water.

I.       Vehicle Washing. The washing of cars, trucks or other vehicles is not permitted, except with a hose equipped with an automatic shut-off device, or at a commercial facility designated and so designated on the city’s billing records.

J.       Drinking Water Provided by Restaurants. Restaurants are requested not to provide drinking water to patrons except by request. (Ord. 443 § 1, 1991)

13.04.970 Stage No. 3—Water shortage emergency—Mandatory conservation measures.

In the event of a water shortage emergency in which the city may be prevented from meeting the water demands of its customers, the city council shall, if possible given the time and circumstances, immediately hold a public hearing at which customers of the city shall have the opportunity to protest and to present their respective needs to the city council. No public hearing shall be required in the event of a breakage or failure of a pump, pipeline, or conduit causing an immediate emergency. The director of public services is empowered to declare a water shortage emergency, subject to the ratification of the city council within seventy-two hours of such declaration, and the following rules and regulations shall be in effect immediately following such declarations:

A.     Prohibition. Watering of parks, school grounds, golf courses, lawn watering, landscape irrigation, washdown of driveways, parking lots or other impervious surfaces, washing of vehicles, except when done by commercial car wash establishments using only recycled or reclaimed water, filling or adding water to swimming pools, wading pools, spas, ornamental ponds, fountains and artificial lakes are prohibited.

B.      Restaurants. Restaurants shall not serve drinking water to patrons except by request.

C.      Construction Meters. No new construction meter permits shall be issued by the city. All existing construction meters shall be removed and/or locked.

D.     Commercial Nurseries and Livestock. Commercial nurseries shall discontinue all watering and irrigation. Watering of livestock is permitted as necessary. (Ord. 443 § 1, 1991)

13.04.980 Mandatory compliance—Implementation and termination.

The director of public services of the city shall monitor the supply and demand for water on a daily basis to determine the level of conservation required by the implementation or termination of the water conservation plan stages and shall notify the city council of the necessity for the implementation or termination of each stage. Each declaration of the city council implementing or terminating a water conservation stage shall be published at least once in a newspaper of general circulation, and shall be posted at the city offices. Each declaration shall remain in effect until the city council otherwise declares, as provided in this section. (Ord. 443 § 1, 1991)

13.04.990 Mandatory compliance—Exception permits.

The director of public services may grant permits for uses of water otherwise prohibited under the provisions of this chapter if he finds and determines that restrictions herein would either:

A.     Hardship. Cause an unnecessary and undue hardship to the water user or the public; or B.      Emergency. Cause an emergency condition affecting the health, sanitation, fire protection or safety of the water use or of the public. (Ord. 443 § 1, 1991)

13.04.1000 Exception granted.

Such exceptions may be granted only upon written application therefor. Upon granting such exception permit, the director of public services may impose any conditions he determines to be just and proper. (Ord. 443 § 1, 1991)

13.04.1010 Enforcement, inspection.

Authorized employees of the city, after proper identification may, during reasonable hours, inspect any facility having a water conservation plan, and may enter onto private property for the purpose of observing the operation of any water conservation device, irrigation equipment or water facility. Employees of the city may also observe the use of water or irrigation equipment within the city from public rights-of-way and as alleged violations are reported to the city. (Ord. 443 § 1, 1991)

13.04.1020 Civil penalties for violation.

Violators of the mandatory provisions of this chapter shall be subject to civil action initiated by the city as follows:

A.     First Violation. For a first violation, the city shall issue a written notice of violation to the water user violating the provisions of this chapter. The notice shall be given pursuant to the requirements listed in Sections 13.04.970 and 13.04.980.

B.      Second Violation. For a second violation of this chapter within a twelve-month period or for failure to comply with the notice of violation within the period stated, a surcharge of one hundred dollars is imposed for the meter through which the wasted water was supplied.

C.      Third Violation. For a third violation of this chapter within a twelve-month period, or for continued failure to comply within thirty days after notice of an imposition of second violation sanctions, a one-month penalty surcharge in the amount of two hundred dollars is imposed for the meter through which the wasted water was supplied. In addition to the surcharge, the city may, at its discretion, install a flow-restricting device at such meter with a one-eighth inch orifice for services up to one and one-half inch size, and comparatively sized restrictors for larger services, on the service of the customer at the premises at which the violation occurred for a period of not less than forty-eight hours. The charge to the customer for installing a flowrestricting device shall be based upon the size of the meter and the actual cost of installation but shall not be less than that provided in the city’s rules and regulations. The charge for removal of the flow-restricting device and restoration of normal service shall be as provided in the city’s rules and regulations.

D.     Subsequent Violations—Discontinuance of Service. For any subsequent violation of this chapter within the twenty-four calendar months after a first violation as provided in this section, the penalty surcharge shall be imposed and the city may discontinue water service to that customer at the premises or to the meter where the violation occurred. The charge for reconnection and restoration of normal service shall be as provided in the rules and regulations of the city. Such restoration of service shall not be made until the director of public services of the city has determined that the water user has provided reasonable assurances that future violations of this chapter by such user will not occur. (Ord. 443 § 1, 1991)

13.04.1030 Notification of violation.

A.     First Violation. For a first violation, written notice shall be given to the customer and/or property owner personally or by regular mail.

B.      Subsequent Violation. If the penalty assessed is a surcharge for a second or third violation, notice may be given by regular mail.

C.      Penalties Involving Installation of Flow-restrictors or Discontinuance of Water Service. If the penalty assessed is, or includes, the installation of a flow restrictor or the discontinuance of water service to the customer for any period of time, notice of the violation shall be given in the following manner:

1.      Personal Service. By giving written notice thereof to the occupant and/or property owner personally, or if the occupant and/or property owner is absent from his/her place of residence and from his/her assumed place of business, by leaving a copy with some person of suitable age and discretion at either place, and sending a copy through the United States mail addressed to the occupant and/or owner of his/her place of business or residence; or

2.      Posting. If such place of residence and business cannot be ascertained, or a person of suitable age or discretion cannot be located, then by affixing a copy in a conspicuous place on the property where the failure to comply is occurring and also by delivering a copy to a person there residing, if such person can be found, and also sending a copy through the United States mail addressed to the occupant at the place where the property is situated and to the owner if different. (Ord. 443 § 1, 1991)

13.04.1040 Form of notice.

All notices provided for in Section 13.04.1030 shall contain, in addition to the facts of the violation, a statement of the possible penalties for each violation and a statement informing the occupant/owner of his/her right to a hearing on the violation. (Ord. 443 § 1, 1991)

13.04.1050 Hearing.

Any customer or property owner against whom a penalty is levied pursuant to this chapter shall have a right to a hearing, in the first instance by the director of public services, with the right of appeal to the city council, on the merits of the alleged violation upon the written request of that customer within fifteen days of the date of alleged violation. At the next regularly scheduled meeting, the customer may then appear and present any evidence in support of his position and ask for a decision by the city council. (Ord. 443 § 1, 1991)

13.04.1060 Delays on action.

The city council shall act promptly to resolve the dispute, but may delay a resolution of the dispute to the time of its next regular meeting in order to investigate the dispute or receive special reports related to the dispute. (Ord. 443 § 1, 1991)

13.04.1070 Decision of the city council.

The decision of the city council shall be final. Should the city council not render a decision within sixty days of application to the city council, this failure to act shall be deemed a denial of the requested action, unless both parties have agreed to extend the resolution period. (Ord. 443 § 1, 1991) View the mobile version.

Loma Linda Municipal Code
Up Previous Next Main Collapse Search Print No Frames
Title 13 WATER AND SEWERS
Chapter 13.32 WATER-EFFICIENT LANDSCAPE

13.32.010 Purpose.

A.     The State Legislature has found that:

1.      The limited supply of state waters are subject to ever increasing demands;

2.      California’s economic prosperity depends on adequate supplies of water;

3.      State Policy promotes conservation and efficient use of water;

4.      Landscapes provide recreation areas, clean the air and water, prevent erosion, offer fire protection and replace ecosystems displaced by development; and

5.      Landscape design, installation and maintenance can and should be water efficient.

B.      Consistent with the legislative findings, the purpose of this chapter is to:

1.      Promote the values and benefits of landscapes while recognizing the need to invest water and other resources as efficiently as possible;

2.      Establish a structure for designing, installing and maintaining water-efficient landscapes in new projects; and

3.      Establish provisions for water management practices and water waste prevention for established landscapes. (Ord. 488 § 1, 1992)

13.32.020 Definitions.

The words used in this chapter have the meaning set forth below:
“Anti-drain valve” or “check valve” means a value located under a sprinkler head to hold water in the system so it minimizes drainage from the lower elevation sprinkler heads. “Application rate” means the depth of water applied to a given area, usually measured in inches per hour. “Applied water” means the portion of water supplied by the irrigation system to the landscape. “As-builts” means a set of reproducible drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor.
“Automatic controller” means a mechanical or solid state timer, capable of operating valve stations to set the days and length of time of a water application. “Backflow prevention device” means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system. “Conversion factor (0.62)” means a number that converts the maximum applied water allowance from acre-inches per acre per year to gallons per square foot per year. The conversion factor is calculated as follows:
(325,829 gallons/43,560 square feet)/12 inches = (0.62) 325,829 gallons = one acre foot
43,560 square feet = one acre
12 inches = one foot
To convert gallons per year to 100-cubic-feet per year, another common billing unit for water, divide gallons per year by 748. (748 gallons = 100 cubic feet.) “Ecological restoration project” means a project where the site is intentionally altered to establish a defined, indigenous, historic ecosystem. “Effective precipitation” or “usable rainfall” means the portion of total precipitation that is used by the plants. Precipitation is not a reliable source of water, but can contribute to some degree toward the water needs of the landscape.
“Emitter” means drip irrigation fittings that deliver water slowly from the system to the soil. “Established landscape” means the point at which plants in the landscape have developed roots into the soil adjacent to the root ball. “Established period” means the first year after installing the plant in the landscape. “Estimated applied water use” means the portion of the estimated total water use is derived from applied water. The estimated applied water use shall not exceed the maximum applied water allowance. The estimated applied water use may be the sum of the water recommended through the irrigation schedule. “Estimated total water use” means the annual total amount of water estimated to be needed to keep the plants in the landscaped area healthy. It is based upon such factors as the local evapotranspiration rate, the size of the landscaped area, the types of plants and the efficiency of the irrigation system. “ET adjustment factor” means a factor of 0.8, that, when applied to reference evapotranspiration, adjusts for plant factors and irrigation efficiency, two major influences upon the amount of water that needs to be applied to the landscape.

A combined plant mix with a site-wide average of 0.5 is the basis of the plant factor portion of this calculation. The irrigation efficiency for purposes of the ET adjustment factor is

0.625, therefore, the ET adjustment factor (0.8) = (0.5/0.625). “Evapotranspiration” means the quantity of water evaporated from adjacent soil surfaces and transpired by plants during a specific time. “Flow rate” means the rate at which water flows through pipes and valves (gallons per minute or cubic feet per second). “Hydrozone” means a portion of the landscaped area having plants with similar water needs that are served by a valve or set or valves with the same schedule. A hydrozone may be irrigated or non-irrigated. For example, a naturalized area planted with native vegetation that will not need supplemental irrigation once established is a non-irrigated hydrozone. “Infiltration rate” means the rate of water entry into the soil expressed as a depth of water per unit of time (inches per hour). “Irrigation efficiency” means the measurement of the amount of water beneficially used divided by the amount of water applied. Irrigation efficiency is derived from measurements and estimates of irrigation system characteristics and management practices. The minimum irrigation efficiency for purposes of this chapter is 0.625. Greater irrigation efficiency can be expected from well designed and maintained systems.
“Landscape irrigation audit” means a process to perform site inspections, evaluate irrigation systems and develop efficient irrigation schedules. “Landscaped area” means the entire parcel less the building footprint, driveways, non-irrigated portions of parking lots, hardscapes — such as decks and patios and other non-porous areas. Water features are included in the calculation of the landscaped area. Areas dedicated to edible plants, such as orchards or vegetable gardens are not included. “Lateral line” means the water delivery pipeline that supplies water to the emitters or sprinklers from the valve. “Main line” means the pressurized pipeline that delivers water from the water source to the valve or outlet. “Maximum applied water allowance” means, for design purposes, the upper limit of annual applied water for the established landscaped area. It is based upon the area’s reference evapotranspiration, the ET adjustment factor, and the size of the landscaped area. The estimated applied water use shall not exceed the maximum applied water allowances. “Mined-land reclamation projects” means any surface mining operation with a reclamation plan approved in accordance with the Surface Mining and Reclamation Act of 1975. “Mulch” means any material such as leaves, bark, straw or other materials left loose and applied to the soil surface to reduce evaporation. “Operating pressure” means the pressure at which a system of sprinklers is designed to operate, usually indicated at the base of a sprinkler. “Overspray” means the water which is delivered beyond the landscaped area, wetting pavements, walks, structures or other non-landscaped areas. “Plant factor” means a factor that when multiplied by reference evapotranspiration, estimates the amount of water used by plants. For purposes of this chapter, the average plant factor or low water using plants ranges from 0 to 0.3, for average water using plants the range is 0.4 to 0.6, and for high water using plants the range is 0.7 to 1.0. “Rain sensing device” means a system which automatically shuts off the irrigation system when it rains. “Record drawing” or “as-builts” means a set of reproducible drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor. “Recreational area” means areas of active play or recreation such as sports fields, school yards, picnic grounds or other areas with intense foot traffic. “Recycled water,” “reclaimed water,” or “treated sewage effluent water” means treated or recycled waste water of a quality suitable for nonpotable uses such as landscape irrigation; not intended for human consumption.
“Reference evapotranspiration” or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given in inches per day, month, or year, and is an estimate of the evapotranspiration of a large field of four-inch to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the maximum applied water allowances so that regional differences in climate can be accommodated. “Rehabilitated landscape” means any re-landscaping project that requires a permit. “Run off” means water which is not absorbed by the soil or landscape to which it is applied and flows from the area. For example, run off may result from water that is applied at too great a rate (application rate exceeds infiltration rate) or when there is a severe slope. “Soil moisture sensing device” means a device that measures the amount of water in the soil. “Soil texture” means the classification of soil based on the percentage of sand, silt, and clay in the soil. “Sprinkler head” means a device which sprays water through a nozzle. “Static water pressure” means the pipeline or municipal water supply pressure when water is not flowing. “Station” means an area served by one valve or by a set of valves that operate simultaneously. “Turf” means a surface layer of earth containing mowed grass with its roots. Annual bluegrass, Kentucky bluegrass, perennial ryegrass, red fescue, and tall fescue are cool-season grasses.

Bermudagrass, kikuyugrass, seashore paspalum, St. Augustinegrass, zoysiagrass, and buffalo grass are warm-season grasses. “Usable rainfall” means the portion of total precipitation that is used by the plants. Precipitation is not a reliable source of water, but can contribute to some degree toward the water needs of the landscape.
“Valve” means a device used to control the flow of water in the irrigation system. “Water conservation concept statement” means a one-page checklist and a narrative summary of the project as shown in Exhibit “A” set out following this chapter. (Ord. 488 § 1, 1992)

13.32.030 Provisions for new or rehabilitated landscapes.

A.     APPLICABILITY.

1.      Except as provided in Section 13.32.030(A)(3), this section shall apply to:
a.      All new and rehabilitated landscaping for public agency projects and private development projects that requires a permit; and b.      Developer-installed landscaping in landscape maintenance district areas of single-family and multi-family projects.

2.      Projects subject to this section shall conform to the provisions in this chapter.

3.      This section shall not apply to:
a.      Homeowner-provided landscaping at single-family and multi-family projects; b.      Cemeteries;
c.      Registered historical sites;
d.      Ecological restoration projects that do not require a permanent irrigation system; or e.      Mined-land reclamation projects that do not require a permanent irrigation system; or f.       Any project with a landscaped area less than twenty- five thousand square feet.

B.      LANDSCAPE DOCUMENTATION PACKAGE.

1.      A copy of the landscape documentation package conforming to this chapter shall be submitted to the city or county. No permit shall be issued until the city or county reviews and approves the landscape documentation package.

2.      A copy of the approved landscape documentation package shall be provided to the property owner or site manager along with the record drawings and any other information normally forwarded to the property owner or site manager.

3.      A copy of the water conservation concept statement and the certificate of substantial completion shall be sent by the project manager to the local retail water purveyor.

4.      Each landscape documentation package shall include the following elements, which are described herein:
a.      Water conservation concept statement;
b.      Calculation of the maximum applied water allowance; c.      Calculation of the estimated applied water use; d.      Calculation of the estimated total water use;
e.      Landscape design plan;
f.       Irrigation design plan;
g.      Irrigation schedule;
h.      Maintenance schedule;
i.       Landscape irrigation audit schedule;
j.       Grading design plan;
k.      Soil analysis;
l.       Certificate of substantial completion (to be submitted after installation of the project.)

5.      If effective precipitation is included in the calculation of the estimated total water use, then an effective precipitation disclosure statement from the landscape professional and the property owner shall be submitted with the landscape documentation package.

C.      ELEMENTS OF LANDSCAPE DOCUMENTATION PACKAGE.

1.      Water Conservation Concept Statement. Each landscape documentation package shall include a cover sheet, referred to as the water conservation concept statement similar to the following example. It serves as a check list to verify that the elements of the landscape documentation package have been completed and has a narrative summary of the project.

2.      The Maximum Applied Water Allowance.
a.      A project’s maximum applied water allowance shall be calculated using the following formula:

MAWA = (ETo) (o.8) (LA) (o.62) where:

MAWA = Max. applied water allowance (gallons per year)
ETo = Reference evapotranspiration (inches per year)

0.8 = ET adjustment factor
LA = Landscaped area (square feet)

0.62 = Conversion factor (to gallons per square foot)
b.      Two example calculations of the maximum applied water allowance i.       Project Site One: Landscaped area of 50,000 sq. ft. in Fresno MAWA = (ETo) (.8) (LA) (.62)
= (51 inches) (.8) (50,000 square feet) (.62)
Maximum applied water allowance = 1,264,800 gallons per year (or 1,691 hundred-cubic-feet per year: 1,264,800/748 = 1,691) ii.      Project Site Two: Landscaped area of 50,000 sq. ft. in San Francisco MAWA = (ETo) (.8) (LA) (.62)
= (35 inches) (.8) (50,000 square feet) (.62)
Maximum Applied Water Allowance = 868,000 gallons per year (or 1,160 hundred-cubic-feet per year) c.      Portions of landscaped areas in public and private projects such as parks, playgrounds, sports fields, golf courses, or school yards where turf provides a playing surface or serves other recreational purposes may require water in addition to the maximum applied water allowance. A statement shall be included with the landscape design plan, designating areas to be used for such purposes and specifying any needed amount of additional water above the maximum applied water allowance.

3.      Estimated Applied Water Use.
a.      The estimated applied water use shall not exceed the maximum applied water allowance. b.      A calculation of the estimated applied water use shall be submitted with the landscape documentation package. It may be calculated by summing the amount of water recommended in the irrigation schedule.

4.      Estimated Total Water Use.
a.      A calculation of the estimated total water use shall be submitted with the landscape documentation package. The estimated total water use may be calculated by summing the amount of water recommended in the irrigation schedule and adding any amount of water expected from effective precipitation (not to exceed twenty-five percent of the local annual mean precipitation) or may be calculated from a formula such as the following:

The estimated total water use for the entire landscaped area equals the sum of the estimated water use of all hydrozones in that landscaped area:

EWU (hydrozone) = (ETo) (PF) (HA) (.62)
(IE)
EWU (hydrozone) = Estimated water use (gallons per year) ETo = Reference evapotranspiration (inches per year)
PF = Plant factor
HA = Hydrozone area (square feet)
(.62) = Conversion factor
IE = Irrigation efficiency
b.      If the estimated total water use is greater than the estimated applied water use due to precipitation being included as a source of water, an effective precipitation disclosure statement such as the one in the section entitled “Effective Precipitation” shall be included in the landscape documentation package.

5.      Landscape Design Plan. A landscape design plan meeting the following requirements shall be submitted as part of the landscape documentation package:
a.      Plant Selection and Grouping.
i.       Any plants may be used in the landscape, providing the estimated applied water use recommended does not exceed the maximum applied water allowance and that the plants meet the specifications set forth in subsections (a)(ii), (a)(iii), and (a)(iv) immediately following. ii.      Plants having similar water use shall be grouped together in distinct hydrozones. iii. Plans shall be selected appropriately based upon their adaptability to the climatic, geologic, and topographical conditions of the site. Protection and preservation of native species and natural areas is encouraged. The planting of trees is encouraged wherever it is consistent with the other provisions of this chapter. iv.     Fire prevention needs shall be addressed in areas that are fire prone. Information about fire prone areas and appropriate landscaping for fire safety is available from local fire departments or the California Department of Forestry.
b.      Water Features.
i.       Recirculating water shall be used for decorative water. ii.      Pool and spa covers are encouraged.
c.      Landscape Design Plan Specifications. The landscape design plan shall be drawn on project base sheets at a scale that accurately and clearly identifies:
i.       Designation of hydrozones;
ii.      Landscape materials, trees, shrubs, groundcover, turf, and other vegetation. Planting symbols shall be clearly drawn and plants labeled by botanical name, common name, container size, spacing, and quantities of each group of plants indicated; iii. Property lines and street names;
iv.     Streets, driveways, walkways, and other paved areas; v.      Pools, ponds, water features, fences and retaining walls; vi.     Existing and proposed buildings and structures including elevation if applicable; vii. Natural features including but not limited to rock outcroppings, existing trees, shrubs that will remain; viii. Tree staking, plant installation, soil preparation details, and any other applicable planting and installation details; ix.     A calculation of the total landscaped area;
x.      Designation of recreational areas.

6.      Irrigation Design Plan. An irrigation design plan meeting the following conditions shall be submitted as part of the landscape documentation package:
a.      Irrigation Design Criteria.
i.       Runoff and Overspray. Soil types and infiltration rate shall be considered when designing irrigation systems. All irrigation systems shall be designed to avoid runoff, low head drainage, overspray, or other similar conditions where water flows onto adjacent property, non-irrigated areas, walks, roadways or structures. Proper irrigation equipment and schedules, including features such as repeat cycles, shall be used to closely match application rates to infiltration rates therefore minimizing runoff.

Special attention shall be given to avoid runoff on slopes and to avoid overspray in planting areas with a width less than ten feet, and in median strips. No overhead sprinkler irrigation systems shall be installed in median strips less than ten feet wide. ii.      Irrigation Efficiency. For the purpose of determining the maximum water allowance, irrigation efficiency is assumed to be 0.625. Irrigation systems shall be designed, maintained, and managed to meet or exceed 0.625 efficiency. iii. Equipment.
(A)   Water Meters. Separate landscape water meters shall be installed for all projects except for single family homes or any projects except for single-family homes or any project with a landscaped area of less than five thousand square feet. (B)    Controllers. Automatic control systems shall be required for all irrigation systems and must be able to accommodate all aspects of the design. (C)    Valves. Plants which require different amounts of water shall be irrigated by separate valves. If one valve is used for a given area, only plants with similar water use shall be used in that area. Anti-drain (check) valves shall be installed in strategic points to minimize or prevent low-head drainage. (D)   Sprinkler Heads. Heads and emitters shall have consistent application rates within each control valve circuit. Sprinkler heads shall be selected for proper area coverage, application rate, operating pressure, adjustment capability, and ease of maintenance. (E)    Rain Sensing Override Devices. Rain sensing override devices shall be required on all irrigation systems. (F)    Soil Moisture Sensing Devices. It is recommended that soil moisture sensing devices be considered where appropriate. b.      Recycled Water.
i.       The installation of recycled water irrigation systems (dual distribution systems) shall be required to allow for the current and future use of recycled water, unless a written exemption has been granted as described in the following subsection (b)(ii). ii.      Irrigation systems shall make use of recycled water unless a written exemption has been granted by the local water agency, stating that recycled water meeting all health standards is not available and will not be available in the foreseeable future. iii. The recycled water irrigation systems shall be designed and operated in accordance with all local and state codes. c.      Irrigation Design Plan Specifications. Irrigation systems shall be designed to be consistent with hydrozones. The irrigation design plan shall be drawn on project base sheets. It should be separate from, but use the same format as, the landscape design plan. The scale shall be the same as that used for the landscape design plan.

The irrigation design plan shall accurately and clearly identify:
i.       Location and size of separate water meters for the landscape; ii.      Location, type and size of all components of the irrigation system, including automatic controllers, main and lateral lines, valves, sprinkler heads, moisture sensing devices, rain switches, quick couplers, and backflow prevention devices; iii. Static water pressure at the point of connection to the public water supply; iv.     Flow rate (gallons per minute), application rate (inches per hour), and design operating pressure (psi) for each station; v.      Recycled water irrigation systems as specified in this chapter.

7.      Irrigation Schedules. Irrigation schedules satisfying the following conditions shall be submitted as part of the landscape documentation package:
a.      An annual irrigation program with monthly irrigation schedules shall be required for the plant establishment period, for the established landscape, and for any temporarily irrigated areas.
b.      The irrigation schedule shall:
i.       Include run time (in minutes per cycle), suggested number of cycles per day, and frequency of irrigation for each station; and ii.      Provide the amount of applied water (in hundred cubic feet, gallons or whatever billing units the local water supplier uses) recommended on a monthly and annual basis. c.      The total amount of water for the project shall include water designated in the estimated total water use calculation plus water needed for any water features, which shall be considered as a high water using hydrozone.
d.      Recreational areas designated in the landscape de-sign plan shall be highlighted and the irrigation schedule shall indicate if any additional water is needed above the maximum applied water allowance because of high plant factors (but not due to irrigation inefficiency). e.      Whenever possible, irrigation scheduling shall incorporate the use of evapotranspiration data such as those from the California Irrigation Management Information System (CIMIS) weather stations to apply the appropriate levels of water for different climates. f.       Whenever possible, landscape irrigation shall be between two a.m. and ten a.m. to avoid irrigating during times of high wind or high temperature.

8.      Maintenance Schedules. A regular maintenance schedule satisfying the following conditions shall be submitted as part of the landscape documentation package:
a.      Landscapes shall be maintained to ensure water efficiency. A regular maintenance schedule shall include but not be limited to checking, adjusting, and repairing irrigation equipment; resetting the automatic controller; aerating and dethatching turf areas; replenishing mulch; fertilizing; pruning, and weeding in all landscaped areas. b.      Whenever possible, repair of irrigation equipment shall be done with the originally specified materials or their equivalents.

9.      Landscape Irrigation Audit Schedules. A schedule of landscape irrigation audits, for all but single-family residences, satisfying the following conditions shall be submitted to the city or county as part of the landscape documentation package:
a.      At a minimum, audits shall be in accordance with the state of California Landscape Water Management Program as described in the Landscape Irrigation Auditor Handbook, the entire document, which is incorporated by reference. (See Landscape Irrigation Auditor Handbook (June 1990) Version 5.5 [formerly Master Auditor Training].) b.      The schedule shall provide for landscape irrigation audits to be conducted by certified landscape irrigation auditors at least once every five years.

10.    Grading Design Plan. Grading design plans satisfying the following conditions shall be submitted as part of the landscape documentation package:
a.      A grading design plan shall be drawn on project base sheets. It should be separate from but use the same format as the landscape design plan. b.      The grading design plan shall indicate finished configurations and elevations of the landscaped area, including the height of graded slopes, drainage patterns, pad elevations, and finish grade.

11.    Soils.
a.      A soil analysis satisfying the following conditions shall be submitted as part of the landscape documentation package:
i.       Determination of soil texture, indicating the percentage of organic matter; ii.      An approximate soil infiltration rate (either measured or derived form soil texture/infiltration rate tables). A range of infiltration rates should be noted where appropriate; iii. Measure of pH, and total soluble salts.
b.      A mulch of at least three inches shall be applied to all planting areas except turf.

12.    Certification.
a.      Upon completing the installation of the landscaping and the irrigation system, an irrigation audit shall be conducted by a certified landscape irrigation auditor prior to the final field observation. (See Landscape Irrigation Auditor Handbook as referenced in Section 13.32.040.) b.      A licensed landscape architect or contractor, certified irrigation designer, or other licensed professional in a related field shall conduct a final field observation and shall provide a certificate of substantial completion to the city or county. The certificate shall specifically indicate that plants were installed as specified, that the irrigation system was installed as designed, and that an irrigation audit has been performed, along with a list of any observed deficiencies. c.      Certification shall be accomplished by completing a certificate of substantial completion and delivering it to the city or county, to the retail water supplier, and to the owner of record. A sample of such a form, which shall be provided by the city or county is set out in Exhibit “B” following this chapter.

D.     PUBLIC EDUCATION—PUBLICATIONS. Local agencies shall provide information to owners of all new, single-family residential homes regarding the design, installation, and maintenance of water efficient landscapes.

Information about the efficient use of landscape water shall be provided to water users throughout the community. (Ord. 488 § 1, 1992)

13.32.040 Provisions for existing landscapes.

A.     Water Management. All existing landscaped areas to which the city or county provides water that are one acre or more shall have a landscape irrigation audit at least every five years. At a minimum, the audit shall be in accordance with the California Landscape Water Management Program as described in the Landscape Irrigation Auditor Handbook, the entire document which is hereby incorporated by reference. (See Landscape Irrigation Auditor Handbook, Dept. of Water Resources, Water Conservation Office (June 1990) Version 5.5.)

1.      If the project’s water bills indicate that they are using less than or equal to the maximum applied water allowance for that project site, an audit shall not be required.

2.      Recognition of projects that stay within the maximum applied water allowance is encouraged.

B.      Water Waste Prevention. Cities and counties shall prevent water waste resulting from inefficient landscape irrigation by prohibiting runoff, low head drainage, overspray, or other similar conditions where water flows onto adjacent property, non-irrigated areas, walks, roadways or structures. Penalties for violation of these prohibitions shall be established locally. (Ord. 488 § 1, 1992)

13.32.050 Effective precipitation.

SAMPLE CERTIFICATE OF SUBSTANTIAL COMPLETION
If effective precipitation is included in the calculation of the estimated total water use, an effective precipitation disclosure statement (similar to the sample Exhibit “C” set out following this chapter) shall be completed, signed, and submitted with the landscape documentation package. No more than twenty-five percent of the local annual mean precipitation shall be considered effective precipitation in the calculation of the estimated total water use. (Ord. 488 § 1, 1992) EXHIBIT “A” SAMPLE WATER CONSERVATION CONCEPT STATEMENT Project Site: Project Number:

Project Location:

Landscape Architect/Irrigation Designer/Contractor:

Included in this project submittal package are:
(Check to indicate completion)
___ 1. Maximum Applied Water Allowance:
___ gallons or cubic feet/year
___ 2. Estimated Applied Water Use:
___ gallons or cubic feet/year
*__ 2.(a) Estimated Amount of Water Expected from Effective Precipitation:
___ gallons or cubic feet/year
___ 3. Estimated Total Water Use:
___ gallons or cubic feet/year
Note: * If the design assumes that a part of the Estimated Total Water Use will be provided by precipitation, the Effective Precipitation Disclosure Statement in Section 704 shall be completed and submitted. The Estimated Amount of Water Expected from Effective Precipitation shall not exceed 25 percent of the local annual mean precipitation (average rainfall). ___ 4. Landscape Design Plan
___ 5. Irrigation Design Plan
___ 6. Irrigation Schedule
___ 7. Maintenance Schedule
___ 8. Landscape Irrigation Audit Schedule
___ 9. Grading Design Plan
___ 10. Soil Analysis
Description of Project
(Briefly describe the planning and design actions that are intended to achieve conservation and efficiency in water use.) Date:__________________ Prepared By:____________________ EXHIBIT “B” SAMPLE CERTIFICATE OF SUBSTANTIAL COMPLETION Project Site/Number:___________________________________________________________ Project Location:______________________________________________________________ Preliminary Project Documentation Submitted (Check indicating submittal) ___ 1. Maximum Applied Water Allowance:
___ (gallons or cubic feet per year)
___ 2. Estimated Applied Water Use:
___ (gallons or cubic feet/year)
___ *2a. Estimated Amount of Water Expected from Effective Precipitation:
___ (gallons of cubic feet/year)
___ 3. Estimated Total Water Use:
___ (gallons of cubic feet/year)
NOTE: *If the design assumes that a part of the Estimated Total Water Use will be provided by precipitation, the Effective Precipitation Disclosure Statement shall be completed and submitted. The estimated Amount of Water Expected from Effective Precipitation shall not exceed 25 percent of the local annual mean precipitation (average rainfall). ___ 4. Landscape Design Plan
___ 5. Irrigation Design Plan
___ 6. Irrigation Schedules
___ 7. Maintenance Schedule
___ 8. Landscape Irrigation Audit Schedule
___ 9. Grading Design Plan
___ 10. Soil Analysis
Post-Installation Inspection: (Check indicating substantial completion) ___ A. Plants installed as specified
___ B. Irrigation system installed as designed
B.      ___ dual distribution system for recycled water B.      ___ minimal run off or overspray
___ C. Landscape irrigation Audit performed
___ Project submittal package and a copy of this certification has been provided to owner/manager and local water agency.

Comments:
________________________________________________________________________________________________________________________________________________________________________ I/we certify that work has been installed in accordance with the contract documents. ________________________________________________________________________ Contractor Signature
________________________________________________________________________ Date License Number
I/we certify that based upon periodic site observations, the work has been substantially completed in accordance with the Water Efficient Landscape Ordinance and that the landscape planting and irrigation installation conform with the approved plans and specifications.
________________________________________________________________________ Landscape Architect Signature
or Irrigation Designer/Consultant
or Licensed or Certified Professional in a Related Field ________________________________________________________________________ Date State License Number
I/we certify that I/we have received all of the contract documents and that it is our responsibility to see that the project is maintained in accordance with the contract documents. ________________________________________________________________________ Owner Signature
____________________
Date
EXHIBIT “C” SAMPLE EFFECTIVE PRECIPITATION DISCLOSURE STATEMENT I certify that I have informed the project owner and developer that this project depends on ______ (gallons or cubic feet) of effective precipitation per year. This represents _____ percent of the local mean precipitation of _______ inches per year.

I have based my assumptions about the amount of precipitation that is effective upon:
________________________________________________________________________________________________________________________________________________________________________ I certify that I have informed the project owner and developer that in times of drought, there may not be enough water available to keep the entire landscape alive. _____________________________________
Licensed or Certified Landscape Professional
I certify that I have been informed by the licensed or certified landscape professional that this project depends upon _________ (gallons or cubic feet) of effective precipitation per year. This represents _________ percent of the local mean precipitation of _______ inches per year.

I certify that I have been informed that in times of drought, there may not be enough water available to keep the entire landscape alive. ________________________ ______________________________ Owner Developer
EXHIBIT “D” REFERENCE EVAPOTRANSPIRATION
(In inches—Historical Data, extrapolated from 12-month Normal Year ETo Maps and U.C. publication 21426)

SAN BERNARDINO COUNTY
Ann
City Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ETo. ________________________________________________________________________________ Baker 2.7 3.9 6.1 8.3 10.4 11.8 12.2 11.0 8.9 6.1 3.3 2.1 86.6 Barstow 2.6 3.6 5.7 7.9 10.1 11.6 12.0 10.4 8.6 5.7 3.3 2.1 83.6 Chino 2.1 2.9 3.9 4.5 5.7 6.5 7.3 7.1 5.9 4.2 2.6 2.0 54.6 Crestline 1.5 1.9 3.3 4.4 5.5 6.6 7.8 7.1 5.4 3.5 2.2 1.6 50.8 Needles 3.2 4.2 6.6 8.9 11.0 12.4 12.8 11.0 8.9 6.6 4.0 2.7 92.1 Lucerne
Valley 2.2 2.9 5.1 6.5 9.2 11.0 11.4 9.9 7.4 5.0 3.0 1.8 75.3 San
Bernardino 2.0 2.7 3.8 4.6 5.7 6.9 7.9 7.4 5.9 4.2 2.6 2.0 55.6 29 Palms 2.6 3.6 5.9 7.9 10.1 11.2 11.2 10.3 8.6 5.9 3.4 2.2 82.9 Victorville 2.3 3.1 4.9 6.7 9.3 10.0 11.2 9.8 7.4 5.1 2.8 1.8 74.6 View the mobile version.

City of Loma Linda Attachment 2
Water Shortage Contingency Plan 20
Attachment 2
Adoption Resolution
2 City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
A. Consider Approving Demands Register of June 9, 2026 (Finance) [CC/HA] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3A.

To
City Council
From
Anna Briones, Sr Account/Finance Analyst
Via
Sonia Fabela, Finance Director
RECOMMENDATION:

It is recommended that the City Council approve the attached list of demands for payment.

Attachments
DR CC 06-09-2026.pdf
DR HA 6-09-26.pdf

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 712052 5/27/2026 7192 GOVERNMENTJOBS.COM, INC. INV-156198 1260812 Governmentjobs.com subscription 2026-2027 1,331.64712052 Total 1,331.64712053 5/27/2026 7671 GUADALUPE MEDINA-FELIX Tuition Reimb Spr26 Tuition Reimbursement Spring Quarter 2026 771.00712053 Total 771.00712054 5/27/2026 7053 MARLIN BUSINESS BANK 42091738 1260188 Printer lease agreement | 002 1,491.58712054 Total 1,491.58712055 5/27/2026 7053 MARLIN BUSINESS BANK 42091739 1260188 Printer lease agreement Apr-May 26 - 001 4,987.56712055 Total 4,987.56712056 5/27/2026 7083 SELF INSURED SERVICES COMPANY 18948-Life June 2026-Life Insurance Premium 542.49 18948 June 2026 Life and Disability Insurance Premium 4,557.96 712056 Total 5,100.45712057 5/27/2026 1245 SO CALIF EDISON 700920661497 April26 Electricity Costs 04/06/26-05/04/26 4,114.30712057 Total 4,114.30712058 5/27/2026 1261 THE GAS COMPANY 19406867366 April26 Gas Costs 04/10/26-05/11/26 70.65712058 Total 70.65712059 6/9/2026 7449 ALEXANDER FOWLER FowlerEngAcademy Tuition reimbursement for Engineer Academy 875.00712059 Total 875.00712060 6/9/2026 1984 ALLSTAR FIRE EQUIP. CO., INC. 260513 1260807 2 turnout sets 9,073.95 272713 1260809 PPE - Particulate hoods (25) 3,500.89
712060 Total 12,574.84712061 6/9/2026 5908 ALTEC INDUSTRIES, INC. 52095507 1260817 Dielectric test and materials for High-lift 907.67712061 Total 907.67712062 6/9/2026 7692 ANTONIO ROJAS 05252026 Meal for 2 staff while working OT for water leak 36.70712062 Total 36.70712063 6/9/2026 7665 AP ELECTRICAL SERVICES 2024489 1260824 Service call for Richardson Well #5 & #6 1,500.00712063 Total 1,500.00712064 6/9/2026 7458 ASCENT AVIATION GROUP INC M340380 1260102 Support & cellular service @ CY Fuel link- June 183.18 M340381 1260110 STA251 Fuel system LNK data Jun 2026 137.38 712064 Total 320.56712065 6/9/2026 3833 ATKINSON, ANDESLON, LOYA, RUUD, & ROMO
789364 1260011 HR Legal fees for Apr 2026 6,556.20
712065 Total 6,556.20
1 of 7

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 712066 6/9/2026 7668 BASE HILL, INC. 27078 1260175 Janitorial Svcs @ City bldgs & Cole House May 2026 11,418.40712066 Total 11,418.40712067 6/9/2026 7264 BEST DRILLING AND PUMP INC. 4917 1230533 Contract for Mt View Well # Rehabilitation 208,689.35712067 Total 208,689.35712068 6/9/2026 1400 BOOT BARN 4 SAN BERNARDINO INV00609824 1260014 Laces & shoes for S. McDonald 5/27/26 200.00 INV00609822 1260014 Shoelaces & shoes for G. Garza 5/27/26 206.40INV00609821 1260014 Work pants & boots for W Scheffler 5/27/26 293.53INV00609825 1260014 Shoe laces for J Ayala 5/27/26 7.56INV00609826 1260014 Work pants for J Juarez 5/27/26 89.98INV00609827 1260014 Work boots for B Bolger 5/27/26 264.25INV00609823 1260014 Work boots for W Scheffler 05/27/26 166.33INV00611264 1260014 Uniform Boots & Uniform Pants- R. Fierros 6/1 268.10INV00611263 1260014 Uniform Boots- J Rodriguez 6/1/26 160.00INV00611262 1260014 Uniform Boots & Uniform Pants D Drummond 6/1/26 124.22INV00611261 1260014 Uniform Boots & Uniform Pants J Ayala 6/1/26 39.14INV00611260 1260014 Uniform Boots & Uniform Pants J De La Cruz 6/1/26 127.82INV00611259 1260014 Uniform Boots & Uniform Pants 6/1/26 73.40INV00611246 1260014 Uniform Boots & Uniform Pants- E Ramirez 6/1/26 19.56INV00611245 1260014 Uniform Boots & Uniform Pants- N Emery 6/1/26 86.09INV00611244 1260014 Uniform Boots & Uniform Pants- A Figuera 6/1/26 313.17INV00611247 1260014 Uniform Boots & Uniform Pants- J Lopez 6/1/26 35.22INV00611242 1260014 Uniform Boots & Uniform Pants- S Campbell 6/1/26 445.28INV00611243 1260014 Uniform Boots & Uniform Pants- R Munoz 6/1/26 274.96INV00611248 1260014 Uniform Boots & Uniform Pants- J. Guitterez 6/1/26 38.15INV00611249 1260014 Uniform Boots & Uniform Pants- M Garcia 6/1/26 192.00INV00611250 1260014 Uniform Boots & Uniform Pants- M. Gonzalez 6/1/26 288.70INV00611258 1260014 Uniform Boots & Uniform Pants- C Montes 6/1/26 166.36 712068 Total 3,880.22712069 6/9/2026 5174 BRENT BILLINGSLEY 1609 1260012 60 lb of Accu-Tab Tablets 5/27/26 5,536.99712069 Total 5,536.99712070 6/9/2026 161 CTWS,LLC 047195 1260017 (15) Cylinders medical oxygen. 317.38712070 Total 317.38712071 6/9/2026 5390 CALIFORNIA HIGHWAY ADOPTION CO 526136 1260216 Maint of southside I10 Fwy @ Mt View Ave May 2026 350.00 526137 1260216 Weed abatement I10 Fwy @ Mt View Ave May 2026 900.00 712071 Total 1,250.00712072 6/9/2026 5240 CDW-GOVERNMENT AJ2YD2Q 1260769 Camera Replacement 2,185.75 AJ3AR9N 1260769 Camera Replacement 759.89AJ4CW6A 1260800 SCADA OVERHAUL - Dell Desktop Computer S/N:851QRF4 1,111.04AJ4LD6D 1260800 SCADA OVERHAUL - Fortinet Hardware and Fortitokens 51,664.70AJ3NH6I 1260769 T91H61 Wall Mount QTY: 1 211.78 2 of 7

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 712072 46182 5240 CDW-GOVERNMENT AJ4NZ3Z 1260769 4MP M4216-V Network Camera QTY: 5 2,668.11712072 Total 58,601.27712073 6/9/2026 7276 CEP-STAR CORPORATION 2268 1260797 Installation of security door at Cole House 995.00 2267 1260782 Exterior repair work at Heritage Park 2,780.00 712073 Total 3,775.00712074 6/9/2026 7123 CHARTER COMMUNICATIONS HOLDINGS, LLC 188772001051426 1260113 Srvc STA252 Acct 1888772001 5/14 -5/16/26 37.69712074 Total 37.69712075 6/9/2026 7123 CHARTER COMMUNICATIONS HOLDINGS, LLC 188776801051426 1260113 Srvc STA251 Acct 188776801 5/18 - 6/17/2026 147.68712075 Total 147.68712076 6/9/2026 7460 CINTAS CORPORATION NO. 3 4269994754 1260158 HazMat uniforms & shop towel rentals 5/21/26 59.27 4270665645 1260158 HazMat uniforms & shop towel rentals- 5/28/26 59.27 712076 Total 118.54712077 6/9/2026 7735 COPP CONTRACTING, INC. 2148R 1260570 CIP 25-130 Retention to be mailed 6/18/26 18,615.06712077 Total 18,615.06712078 6/9/2026 7591 CRICKET SCADA LLC 1830 1260028 Service for Richardson Treatment Plant 600.00712078 Total 600.00712079 6/9/2026 254 DAART ENGINEERING CO, INC. 39326 1250766 Annual fire pump test 5/1/26 - 5/31/26 2,252.00712079 Total 2,252.00712080 6/9/2026 1279 DAILY JOURNAL CORPORATION B4043542 1260029 Legal advertising for CIP 26-676 431.08 B4043543 1260029 Notice inviting bids for CIP 26-133 420.92B4043557 1260029 Notice inviting bids for CIP 25-758 392.98 712080 Total 1,244.98712081 6/9/2026 1279 DAILY JOURNAL CORPORATION B4047316 1260029 NOH: PC 6.15.26 - Council Bill: O-2026-08 354.88 B4047318 1260029 NOH: PC 6.15.26 - Council Bill: O-2026-09 to 11 436.16 712081 Total 791.04712082 6/9/2026 7290 DANNY ELLIS 0001286224 1260030 Heritage Park Building ""B"" 12.04712082 Total 12.04712083 6/9/2026 7262 DREAMSEATS, LLC 4793186 1260770 (6) Recliners for STA251 8,847.38712083 Total 8,847.38712084 6/9/2026 1521 FACILITIES PROTECTION SYSTEMS 97860 1260097 Replace the failed heat sensor in the Community Rm 1,010.00 97861 1260097 Civic Center Svc Call 5/15/26 1,843.4497873 1260097 SVC Call for fire alarm @ CY 380.00 3 of 7

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 712084 Total 3,233.44712085 6/9/2026 3197 KALMIKOV ENTERPRISES, INC 01P5749 1260036 PPE Indicator light glasses 371.85 0102W22090 1260822 Various repairs to T251 S3183 2006 Spartan 10,404.37 712085 Total 10,776.22712086 6/9/2026 5256 FLYERS ENERGY, LLC 26-641984 1260038 Fuel delivery for PW 5/27/26 4,133.41 26-641985 1260038 Fire Dept. Fuel delivery 5/27/2026. 2,430.49 712086 Total 6,563.90712087 6/9/2026 359 FOUNDATION FOR CROSS-CONNECT

CONTROL & HYDR RSRCH
18406 1220232 Membership Renewal 265.30
712087 Total 265.30
712088 6/9/2026 7240 HPS WEST, INC IN0004882 1260787 Gasket, box, allegro pit, & meter tools 6,610.88 IN0004901 1260787 Register housings, shroud lids, & stopper pins 2,497.39 712088 Total 9,108.27712089 6/9/2026 7349 ICC CODIFICATION, INC. PG000046508 1260823 LLMC Code Codification Supplemental No. 2 1,966.00712089 Total 1,966.00712090 6/9/2026 7545 INLAND EMPIRE PLUMBING INC INV1797 1260046 Eye wash station replacement 431.68 INV1812 1260789 Sink installation in fleet shop 495.26
712090 Total 926.94712091 6/9/2026 4896 INTERFACE SECURITY SYSTEMS, LLC 21105706 1260224 Alarms @ SC & Heritage Park 6/1/26 - 8/31/26 491.76 712091 Total 491.76712092 6/9/2026 7470 IPERMIT, LLC REFUNDBHVC2026-0172 REFUND FOR PERMIT BHVC2026-0172 160.50712092 Total 160.50712093 6/9/2026 5144 JAMES D. HUSS JR. 26110 FIRE 1260090 Weed abatement for APN 0284-071-05 380.00 26109 FIRE 1260090 Weed abatementfor APN 028213206 210.00 712093 Total 590.00712094 6/9/2026 4890 JOLYNN LINDE 54 1260176 Landscape Maintenance in the LMD Area- Jun 2026 23,577.00 57 1260177 Lateral water line repairs @ Area #41 800.0056 1260825 Trimming of (8) Pepper trees 4,800.00 712094 Total 29,177.00712095 6/9/2026 503 JON'S FLAGS & POLES F92956 1260051 (3) Flags 242.51712095 Total 242.51712096 6/9/2026 2986 KATHY CAMPS 26116 1260095 Mask decals for A. Chaconas 47.34 25627 1260095 Mask decals for M. Flores & T. Harris 88.87 712096 Total 136.21
4 of 7

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 712097 6/9/2026 7796 L. Y. ENVIRONMENTAL, INC. 36273 1260815 Asbestos Survey for Corp Yard 450.00712097 Total 450.00712098 6/9/2026 7794 LEE, MICHELLE 993767652 Refund overpayment closed acct #993767652 2.46712098 Total 2.46712099 6/9/2026 5375 LEVEL 3 COMMUNICATIONS, LLC 784668896 IP and Data services April/May 26 14,199.00712099 Total 14,199.00712100 6/9/2026 557 LIFE ASSIST, INC. 2124787 1260808 Emergency medical supplies and equipment. 2,833.34712100 Total 2,833.34712101 6/9/2026 1733 LOWE'S COMPANIES, INC. 79964 1260129 ""L"" Bracket for Civic Center 22.27 95645 1260129 Dry wall patch, silicon, screws, brackets, etc. 68.4078924 1260129 Sand for CY 5/20/26 38.3778931 1260129 Utility knife, blades, & scissors 52.62 712101 Total 181.66712102 6/9/2026 2875 LYNN MERRILL & ASSOCIATES, INC. FY 26-9 1260293 FY 2026 Consulting fees for NPDES Apr 2026 247.42712102 Total 247.42712103 6/9/2026 2099 MCCROMETER, INC. 8012673 1260214 Sewer Flow Meter Monitoring Srv Contract May 2026 1,170.00712103 Total 1,170.00712104 6/9/2026 7795 MELISSA RENEE WILSON 993767226 Refund overpayment closed acct #993767226 181.04712104 Total 181.04712105 6/9/2026 3470 MISSION LANE MAINTENCE CORP INV-8908 1260197 City's share- Maint Mission Lane HOA June 2026 1,595.00712105 Total 1,595.00712106 6/9/2026 7788 MORLEY EQUIPMENT COMPANY LLC 5534 1260794 Walk-behind saw (M-35) 14,942.25712106 Total 14,942.25712107 6/9/2026 5992 RALPH MUNOZ 06012026 REIMB Tuition reimb for Treatment Operator 2 5/20/26 284.25712107 Total 284.25712108 6/9/2026 7193 O'REILLY AUTO ENTERPRISES, LLC 6160-319802 1260140 Missing fuel cap for PK804 16.40 6160-320743 1260140 Brake shoes for AC533 Credit (53.77)6160-318383 1260140 Lug nuts 31.126160-318417 1260140 Oil & air filter 136.54 712108 Total 130.29712109 6/9/2026 7176 ODP BUSINESS SOLUTIONS, LLC 466173693001 1260061 Binders 75.93712109 Total 75.93 5 of 7

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 712110 6/9/2026 7673 PAPE' D.W. INC. 8M 36688 S 1260786 2"" Boring tool with accessories 5,901.34712110 Total 5,901.34712111 6/9/2026 1592 PHOENIX GROUP INFORMATION SYST 042026143 1260117 Delinquent parking ticket pgrm April 2026 979.92 712111 Total 979.92712112 6/9/2026 5772 QUINN COMPANY 35207701 1260067 Double drum roller rental to compact DG @ Pk 360.49712112 Total 360.49712113 6/9/2026 5911 RDO EQUIPMENT CO P5732035 1260071 BC1000XL Kit 497.46 P5731935 1260071 Bushing, rings, lock, & mower blade 444.68 712113 Total 942.14712114 6/9/2026 7485 RIGHT LANE TRUCKING SCHOOL INC. 00040 1260806 Class B Training for 5 employees 7,500.00712114 Total 7,500.00712115 6/9/2026 7306 ROADPOST USA INC BU01890643 1260144 Iridium Satellite Service 5/25-6/24/26 746.75712115 Total 746.75712116 6/9/2026 7440 ROADSAFE TRAFFIC SYSTEMS, INC. 272546 1260075 Street signs & delivery 668.78712116 Total 668.78712117 6/9/2026 3698 SCOTT K. ZEHM 05202026 1260179 City Hall Fountain Maintenance May 2026 160.00712117 Total 160.00712118 6/9/2026 6137 SILVERSTRAND TECHNOLOGIES, INC. 173334 1260104 RTP & Corp Yard Security Alarm Monitoring Jun 2026 49.98712118 Total 49.98712119 6/9/2026 451 SITEONE LANDSCAPE SUPPLY, LLC 166425991-001 1260132 Emergency leak @ Hulda Crooks Park 167.09 166504711-001 1260132 6"" nails for turf 103.61166542298-001 1260132 PVC Expansion & coupling 31.47 712119 Total 302.17712120 6/9/2026 1131 SOUTH COAST A.Q.M.D. 4723508 1260816 AQMD Fee July 2025 through June 2026 STA252 172.49 4725355 1260820 Hot Spot Fee 3.2 MG Reservoir Jul 2025- Jun 2026 172.49 712120 Total 344.98712121 6/9/2026 1356 STAPLES BUSINESS ADVANTAGE 6063889697 1260081 Conference Room Trashbin 14.54 6063889698 1260081 Magnetic Filing Label 13.676063889702 1260081 Fan, Notebooks, Sheet Protector, Magnet Clip & Cup 202.776063889701 1260081 CommDev Conference Room Fan 155.866064331373 1260081 Replacement Big & Tall Office Chair 680.976063889700 1260081 Various general office supplies 136.29 712121 Total 1,204.10712122 6/9/2026 6003 VEOLIA WTS SERVICES USA, INC. 903795624 1260223 Deionized water reg fees May 2026 STA251 91.70 6 of 7

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 712122 46182 6003 VEOLIA WTS SERVICES USA, INC. 903795713 1260223 Deionized water tank rental fee STA252 165.05712122 Total 256.75712123 6/9/2026 237 THE COUNSELING TEAM, INC. INV109247 1260284 Employee support services April 2026 800.00 INV110061 1260284 Employee support services June 2026 800.00 712123 Total 1,600.00712124 6/9/2026 7199 THE LLOYD PEST CONTROL CO, INC. 9243321 1260213 Gopher control svcs for Hulda Crooks May 2026 354.00 9243328 1260213 Gopher control svcs for BB Fields May 2026 326.009250458 1260213 Gopher control svcs for Elmer Digneo- May 2026 216.009243292 1260213 Gopher control svcs for Bryn Mawr- May 2026 216.009243329 1260212 Gopher control services for Civic Center 326.009250457 1260213 Gopher control svcs for Bailey Pk May 234.00 712124 Total 1,672.00712125 6/9/2026 2594 THOMAS INGALLS TIngalls-BAM540ProMn Tuition reimbursement for BAM540 Proj Management 675.00712125 Total 675.00712126 6/9/2026 2862 TRL SYSTEMS, INC. 44272 1260813 Service call for East Fountain Entrance Door 240.00712126 Total 240.00712127 6/9/2026 1854 UNDERGROUND SERVICE ALERT OF 25-263880 1260164 Dig Alert State Regulatory Fee May 2026 36.65 520260172 1260192 Dig Alert Tickets May 2026 98.15
712127 Total 134.80712128 6/9/2026 1977 VULCAN MATERIALS 6492530 1260088 Agg, asphalt & oil bucket 245.15712128 Total 245.15712129 6/9/2026 5500 WEST COAST ARBORISTS, INC. 244393 1260187 Tree services at various locations 2,940.00712129 Total 2,940.00712130 6/9/2026 1919 WILLDAN 00238113 1260341 Animal control on-call services April 2026 8,100.00712130 Total 8,100.00712131 6/9/2026 1919 WILLDAN 002-38027 1260156 Civil/Parcel Map Review- Apr 2026 3,780.00 002-37923 1260118 Fire Prevention Plan Insp Srvcs May 2026 5,473.0000238114 1260346 Code Enforcement officer srvcs April 2026 9,562.95 712131 Total 18,815.95712132 6/9/2026 3968 WINZER FRANCHISE CORPORATION 3505778 1260093 Credit for Inv #3457195 for copper washes (163.97) 3457195 1260093 Copper seal washes 163.973906975 1260093 Wire lug, copper lug, & wire tie for vehicles 169.03 712132 Total 169.03Grand Total $ 520,713.19
7 of 7

CITY OF LOMA LINDA

VOUCHER LIST
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION AMOUNT73671 5/22/2026 454 MissionSquare 2026052200073671 457 Plan Contributions 05/03/2026 through 05/16/2026 $23,211.59103293504 5/20/2026 771 PERS 1003293504/05/06/07 Retirement Contributions 04/19/2026 through 05/02/2026 $85,948.26103278017 5/7/2026 773 PERS 1003278017 Health Insurance Premium-May 2026 $89,983.99 Total Wires: $199,143.84
Total Checks (Total from previous page): $520,713.19
Grand Total = $719,857.03
PAYROLL: 06/04/2026 $459,943.46CLAIMS VOUCHER APPROVALSonia Fabela, Finance DirectorRecommend that City Council approve for payment.

T. Jarb Thaipejr, City Managerhereby directed to pay except as noted.Phillip Dupper, Mayor I have reviewed the above listing of payments on check 712052 through 712132 and wire nos. 73671, 103293504 & 103278017 for a total disbursement of $719,857.03 and to the best of my knowledge, based on the information provided, they are correct and are recommended for payment.Approved by the City Council at their meeting held on June 9, 2026 and the City Treasurer is 1 of 1
, Finance Manager
For:

CITY OF LOMA LINDA

VOUCHER LIST

HOUSING AUTHORITY
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION Amount 3165 5/27/2026 7053 MARLIN BUSINESS BANK 42091738HA 1260188 Printer lease agreement HA | 002 12.623165 Total 12.623166 5/27/2026 7053 MARLIN BUSINESS BANK 42091739HA 1260188 Printer lease agreement HA Apr-May 26 | 001 42.223166 Total 42.223167 6/9/2026 6222 BAMBOO IDE8 INS SERVICES, LLC CASNH100242992-26-27 1260821 HA Insurance Renewal 10938 Cabrillo Lp - Roongchai 2,850.003167 Total 2,850.003168 6/9/2026 5240 CDW-GOVERNMENT AJ2YD2QHA 1260769 Camera Replacement 18.51 AJ3AR9NHA 1260769 Camera Replacement 6.44
AJ3NH6IHA 1260769 T91H61 Wall Mount QTY:1 HA 1.78AJ4NZ3ZHA 1260769 4MP M4216-V Network Camera (QTY: 5) 22.62 3168 Total 49.35Grand Total $ 2,954.19
1 of 1

CITY OF LOMA LINDA

VOUCHER LIST

HOUSING AUTHORITY
06/09/2026
VOUCHER DATE VENDOR VENDOR NAME INVOICE P.O. INVOICE DESCRIPTION AMOUNT Total Checks ( Total from previous page): $2,954.19
Grand Total= $2,954.19

CLAIMS VOUCHER APPROVAL
Sonia Fabela, Finance Director
Recommend that City Council approve for payment.T. Jarb Thaipejr, City Managerhereby directed to pay except as noted.Phillip Dupper, MayorI have reviewed the above listing of payments on check nos. 3165 through 3168 for a total disbursement of $2,954.19 and to the best of my knowledge, based on the information provided, they are correct and are recommended for payment.Approved by the City Council at their meeting held on June 9, 2026 and the City Treasurer is 1 of 1
, Finance Manager
For:

City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
B. Treasurer's Report - May 2026 (Finance) [CC]
Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3B.

To
City Council
From
Anna Briones, Sr Account/Finance Analyst
RECOMMENDATION:

It is recommended that the City Council receive the report for filing.

Attachments
May 2026 Treasurer's Report.pdf

DEMAND DEPOSIT ACCOUNTS
CITY - BANK OF AMERICA - MAIN CHECKING ACCOUNT $ 5,780,279.10 Outstanding Checks as of month-end (1,484,976.94)
CITY - MAIN CHECKING ACCOUNT AVAILABLE BALANCE $ 4,295,302.16 BANK OF AMERICA - PAYROLL $ 19,380.98
HOUSING AUTHORITY - BANK OF AMERICA - CHECKING ACCOUNT 277,210.48 Outstanding Checks as of month-end (10,223.77)
HOUSING AUTHORITY - CHECKING ACCOUNT AVAILABLE BALANCE $ 266,986.71 SUCCESSOR AGENCY - BANK OF AMERICA - CHECKING ACCOUNT 1,582,843.91 Outstanding Checks as of month-end -
SUCCESSOR AGENCY - CHECKING ACCOUNT AVAILABLE BALANCE $ 1,582,843.91 DEMAND DEPOSIT ACCOUNTS - TOTAL $ 6,164,513.76
YIELD

LOCAL AGENCY INVESTMENT FUND (LAIF)
CITY 3.810% $ 63,875,878.48
CITY - Former RDA Bond Proceeds 3.810% 201,726.63
CITY -Total 64,077,605.11
SUCCESSOR RDA 3.810% 2,971,592.47
HOUSING AUTHORITY 3.810% 1,924,645.90
INVESTMENTS TOTALS $ 68,973,843.48

OTHER CASH
IMPREST ACCOUNT $ 500.00
CASH ON HAND 1,350.00
OTHER CASH TOTAL $ 1,850.00
CASH AND INVESTMENTS - GRAND TOTAL 75,140,207.24
PREVIOUS MONTH 70,162,740.35
CHANGE +/(-) $ 4,977,466.89
All investments are in accordance with the City Investment Policy, and as such, sufficient funds are available to meet the cash flow requirements of Loma Linda, including the next thirty days' obligations.

Treasurer
MAY 2026

CITY OF LOMA LINDA

COMPOSITION OF CASH

INVESTMENTS
for: Sonia Fabela
-
10,000,000.00 20,000,000.00 30,000,000.00 40,000,000.00 50,000,000.00 60,000,000.00 70,000,000.00 80,000,000.00 5/25 6/25 7/25 8/25 9/25 10/25 11/25 12/25 1/26 2/26 3/26 4/26 5/26

CITY OF LOMA LINDA
MONTHLY TREASURER'S REPORT 5/2025-5/2026

CITY, SUCCESSOR RDA & HA - TOTAL CASH AVAILABLE CITY- FORMER RDA BOND PROCEEDS BASELINE City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
C. Council Bill #R-2026-29 - Consider Adopting a Resolution Approving a Final Parcel Map No. 20681 (southeast corner of Redlands Blvd. and Bryn Mawr Ave.) (Public Works) [CC] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3C.

To
City Council
From
John Trujillo, Deputy Director Public Works
Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

It is recommended that City Council adopt Council Bill #R-2026-29 approving the Final Parcel Map No. 20681.

Resolution title:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LOMA LINDA, APPROVING FINAL PARCEL MAP 20681 LOCATED EAST OF BRYN MAWR AVENUE, SOUTH OF REDLANDS BOULEVARD, AND NORTH OF PARK AVENUE (APN: 0292-461-10)
BACKGROUND:

The purpose of Final Parcel Map No. 20681 is to subdivide approximately 19.373 acres into three (3) parcels for future development. The proposed parcel sizes are as follows:

Parcel 1: 4.720 acres
Parcel 2: 11.059 acres
Parcel 3: 3.594 acres
ANALYSIS:

The final Parcel Map has been reviewed by City staff and determined to be technically correct and consistent with applicable City requirements and conditions of approval. The map has been prepared in accordance with the approved tentative tract map and applicable provisions of the California Subdivision Map Act.

ENVIRONMENTAL IMPACT:

There is no direct financial impact associated with approval of the final Parcel Map.

FINANCIAL IMPACT:

N/A
Attachments
Resolution Parcel Map 20681_draft.pdf
Parcel Map 20681.pdf
Council Bill #R-2026-29
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LOMA
LINDA APPROVING FINAL PARCEL MAP 20681 LOCATED EAST OF

BRYN MAWR AVENUE, SOUTH OF REDLANDS BOULEVARD, AND
NORTH OF PARK AVENUE (APN: 0292-461-10)
WHEREAS, on August 21, 2024, the Planning Commission approved Tentative Parcel Map No. 20681 to subdivide an approximate 19.373-acre site into four parcels, including two parcels for future commercial and residential development, one parcel designated as an Oak Woodland Preserve, and one 0.25- acre parcel intended for parking associated with the Preserve. The property is located east of Bryn Mawr Avenue, south of Redlands Boulevard, and north of Park Avenue within Planning Area 3-3 of The Groves at Loma Linda Specific Plan (APN: 0292-461-10); and
WHEREAS, on June 2, 2026, the Community Development Department approved Minor Modification No. MOD-2026-0029, which removed the 0.25-acre parking parcel from the approved Tentative Parcel Map and Oak Woodland Preserve parcel, resulting in a revised subdivision layout consisting of three parcels totaling approximately 19.37 acres; and
WHEREAS, Final Parcel Map No. 20681 proposes to subdivide the 19.37-acre site into three parcels:

Parcel 1, consisting of 4.720 acres; Parcel 2, consisting of 11.059 acres; and Parcel 3, consisting of 3.594 acres designated as an Oak Woodland Preserve for the conservation of existing oak trees and open space; and WHEREAS, Final Parcel Map 20681 has been reviewed by City staff and determined to be consistent with the approved Tentative Parcel Map, as modified, and all applicable conditions of approval; and WHEREAS, the Public Works Department has reviewed Final Parcel Map No. 20681 and determined that it is technically correct and in compliance with the California Subdivision Map Act and the Loma Linda Municipal Code; and
WHEREAS, all required public improvements are either complete or secured in accordance with City requirements and are subject to inspection and approval by the City; and Resolution No.

Page 2 ends

WHEREAS, no additional public right-of-way dedications are required in connection with Final Parcel Map No. 20681; and
WHEREAS, approval of the Final Parcel Map No. 20681 will facilitate future development consistent with the City's General Plan, The Groves Specific Plan, and applicable land use regulations.

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LOMA LINDA AS FOLLOWS:

1. The foregoing recitals are true and correct and are incorporated herein by this reference.

2. The City Council finds that Final Parcel Map No. 20681 is consistent with the approved Tentative Parcel Map, as modified, and complies with the provisions of the California Subdivision Map Act and the Loma Linda Municipal Code.

3. The City Council hereby approves Final Parcel Map No. 20681.

4. The Mayor, City Clerk, City Engineer, and any other appropriate City officials are authorized to execute and process all documents necessary to facilitate the recordation of Final Parcel Map No. 20681.

5. The City Clerk shall certify the adoption of this Resolution.

PASSED, APPROVED AND ADOPTED this 9th day of June 2026 by the City Council of the City of Loma Linda by the attached vote:

Phillip Dupper, Mayor
ATTEST:

Lynette Arreola, City Clerk
Resolution No.

Page 3 ends

CERTIFIED VOTE
I, Lynette Arreola, City Clerk of the City of Loma Linda, State of California, do hereby certify that the foregoing Resolution No. XXX was duly adopted by the City Council at a meeting thereof held on the 9th day of June 2026, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF I have hereto set my hand or affixed the Seal of the City of Loma Linda this 9th day of June 2026.

Lynette Arreola, City Clerk
City of Loma Linda

City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
D. Council Bill #R-2026-31 - Consider Adopting a Resolution of the City Council of the City of Loma Linda, California, Updating the Miscellaneous and Fire Salary Schedule Effective July 1, 2026 (Administration) [CC] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3D.

To
City Council
From
Jennifer Pearsall, Human Resources/Risk Management Analyst Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

The City recommends that the City Council adopt Resolution No. 2026-XX updating the Miscellaneous and Fire salary schedule to reflect approved cost of living adjustments effective July 1, 2026. Resolution title:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LOMA LINDA, CALIFORNIA, UPDATING THE MISCELLANEOUS AND FIRE SALARY SCHEDULES EFFECTIVE JULY 1, 2026 BACKGROUND:

California Code of Regulations, Title 2, Section 570.5 requires governing bodies of local agencies contracting with CalPERS to approve and adopt a publicly available pay schedule at a public meeting.

The Loma Linda Professional and Administrative Employees Association (LLPAEA), Loma Linda Public Works Employees Association (LLPWEA), Loma Linda Professional Firefighters (LLPF), Unrepresented Safety Fire Management/Confidential Employees (USFMCE), and Unrepresented Miscellaneous Management/Confidential Employees (UMCE) previously approved a three percent (3%) salary increase effective July 1, 2026.

The Fire Chief position is scheduled to receive a four percent (4%) salary increase effective July 1, 2026, in accordance with the terms listed within the Unrepresented Safety Fire Management/Confidential Employees (USFMCE) benefit profile.

The City Manager position is scheduled to receive a four percent (4%) salary increase effective July 1, 2026, in accordance with the terms of the City Manager's employment agreement.

ANALYSIS:

The compensation adjustments reflected in the attached salary schedule have previously been negotiated and approved by the City Council through applicable memorandum of understanding, benefit profiles, and employment agreements. Adoption of the resolution updates the City's publicly available salary schedule to reflect the approved compensation adjustments effective July 1, 2026, and ensures compliance with CalPERS reporting requirements.

ENVIRONMENTAL IMPACT:

N/A
FINANCIAL IMPACT:

The Fiscal Year 2026-27 Budget includes funding for the approved cost of living salary adjustments, including the three percent (3%) increase for represented and unrepresented employee groups and the four percent (4%) increases for the Fire Chief and City Manager positions.

Attachments
Exhibit A.pdf
RESOLUTION NO - COLA 06-09-2026.pdf

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 ACCOUNTANT UMCE Annual 22 81,577.8204 85,656.7132 89,939.5482 94,436.5291 99,158.3550 104,116.2785 106,719.1863 109,387.1657 Monthly 6,798.1517 7,138.0594 7,494.9624 7,869.7108 8,263.1962 8,676.3565 8,893.2655 9,115.5971Bi-weekly 3,137.6085 3,294.4890 3,459.2134 3,632.1742 3,813.7829 4,004.4723 4,104.5841 4,207.1987Hourly 39.2201 41.1811 43.2402 45.4022 47.6723 50.0559 51.3073 52.5900 ACCOUNTING SPECIALIST TEAM A Annual 18 59,962.1354 62,960.2456 66,108.2602 69,413.6732 72,884.3591 76,528.5731 78,441.7848 80,402.8317 Monthly 4,996.8446 5,246.6871 5,509.0217 5,784.4728 6,073.6966 6,377.3811 6,536.8154 6,700.2360Bi-weekly 2,306.2360 2,421.5479 2,542.6254 2,669.7567 2,803.2446 2,943.4067 3,016.9917 3,092.4166Hourly 28.8279 30.2693 31.7828 33.3720 35.0406 36.7926 37.7124 38.6552 ACCOUNT CLERK TEAM A Annual 15 47,599.8811 49,979.8794 52,478.8734 55,102.8222 57,857.9633 60,750.8569 62,269.6271 63,826.3635 Monthly 3,966.6568 4,164.9899 4,373.2394 4,591.9019 4,821.4969 5,062.5714 5,189.1356 5,318.8636Bi-weekly 1,830.7647 1,922.3031 2,018.4182 2,119.3393 2,225.3063 2,336.5714 2,394.9857 2,454.8601Hourly 22.8846 24.0288 25.2302 26.4917 27.8163 29.2071 29.9373 30.6858 ACCOUNTING TECHNICIAN TEAM A Annual 17 55,520.4953 58,296.5160 61,211.3383 64,271.9030 67,485.4964 70,859.7741 72,631.2673 74,447.0446 Monthly 4,626.7079 4,858.0430 5,100.9449 5,355.9919 5,623.7914 5,904.9812 6,052.6056 6,203.9204Bi-weekly 2,135.4037 2,242.1737 2,354.2822 2,471.9963 2,595.5960 2,725.3759 2,793.5103 2,863.3479Hourly 26.6925 28.0272 29.4285 30.9000 32.4450 34.0672 34.9189 35.7918 ADMINISTRATIVE SPECIALIST I TEAM A Annual 13 40,809.2307 42,849.6916 44,992.1756 47,241.7902 49,603.8849 52,084.0745 53,386.1740 54,720.8324 Monthly 3,400.7692 3,570.8076 3,749.3480 3,936.8158 4,133.6571 4,340.3395 4,448.8478 4,560.0694Bi-weekly 1,569.5858 1,648.0651 1,730.4683 1,816.9919 1,907.8417 2,003.2336 2,053.3144 2,104.6474Hourly 19.6198 20.6008 21.6309 22.7124 23.8480 25.0404 25.6664 26.3081 ADMINISTRATIVE SPECIALIST II TEAM A Annual 14 44,073.9682 46,277.6614 48,591.5404 51,021.1163 53,572.1767 56,250.7861 57,657.0532 59,098.4847 Monthly 3,672.8307 3,856.4718 4,049.2950 4,251.7597 4,464.3481 4,687.5655 4,804.7544 4,924.8737Bi-weekly 1,695.1526 1,779.9101 1,868.9054 1,962.3506 2,060.4683 2,163.4918 2,217.5790 2,273.0186Hourly 21.1894 22.2489 23.3613 24.5294 25.7559 27.0436 27.7197 28.4127 1 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 ADMINISTRATIVE SPECIALIST III TEAM A Annual 17 55,520.4953 58,296.5160 61,211.3383 64,271.9030 67,485.4964 70,859.7741 72,631.2673 74,447.0446 Monthly 4,626.7079 4,858.0430 5,100.9449 5,355.9919 5,623.7914 5,904.9812 6,052.6056 6,203.9204Bi-weekly 2,135.4037 2,242.1737 2,354.2822 2,471.9963 2,595.5960 2,725.3759 2,793.5103 2,863.3479Hourly 26.6925 28.0272 29.4285 30.9000 32.4450 34.0672 34.9189 35.7918 ASSISTANT PLANNER UMCE Annual 20 69,939.8373 73,436.8331 77,108.6713 80,964.1026 85,012.3043 89,262.9149 91,494.4860 93,781.8476 Monthly 5,828.3198 6,119.7361 6,425.7226 6,747.0086 7,084.3587 7,438.5762 7,624.5405 7,815.1540Bi-weekly 2,689.9937 2,824.4936 2,965.7181 3,114.0039 3,269.7040 3,433.1890 3,519.0187 3,606.9941Hourly 33.6249 35.3062 37.0715 38.9250 40.8713 42.9149 43.9877 45.0874 ASSOCIATE PLANNER UMCE Annual 22 81,577.8204 85,656.7132 89,939.5482 94,436.5291 99,158.3550 104,116.2785 106,719.1863 109,387.1657 Monthly 6,798.1517 7,138.0594 7,494.9624 7,869.7108 8,263.1962 8,676.3565 8,893.2655 9,115.5971Bi-weekly 3,137.6085 3,294.4890 3,459.2134 3,632.1742 3,813.7829 4,004.4723 4,104.5841 4,207.1987Hourly 39.2201 41.1811 43.2402 45.4022 47.6723 50.0559 51.3073 52.5900 BACK FLOW CROSSCONNECTION SPECIALIST TEAM PW Annual 18 59,962.1354 62,960.2456 66,108.2602 69,413.6732 72,884.3591 76,528.5731 78,441.7848 80,402.8317 Monthly 4,996.8446 5,246.6871 5,509.0217 5,784.4728 6,073.6966 6,377.3811 6,536.8154 6,700.2360Bi-weekly 2,306.2360 2,421.5479 2,542.6254 2,669.7567 2,803.2446 2,943.4067 3,016.9917 3,092.4166Hourly 28.8279 30.2693 31.7828 33.3720 35.0406 36.7926 37.7124 38.6552 CITY CLERK UMCE Annual 26 110,985.7189 116,535.0049 122,361.7557 128,479.8412 134,903.8344 141,649.0232 145,190.2457 148,820.0018 Monthly 9,248.8099 9,711.2504 10,196.8130 10,706.6534 11,241.9862 11,804.0853 12,099.1871 12,401.6668Bi-weekly 4,268.6815 4,482.1156 4,706.2214 4,941.5324 5,188.6090 5,448.0394 5,584.2402 5,723.8462Hourly 53.3585 56.0264 58.8278 61.7692 64.8576 68.1005 69.8030 71.5481 CITY MANAGER UMCE Annual 307,496.7923
Monthly 25,624.7327Bi-weekly 11,826.7997Hourly 147.8350

COUNCIL MEMBER ELECTED
OFFICIAL Annual 12,800.7600
Monthly 1,066.7300
2 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 COMMUNICATIONS INFRASTRUCTURE INSPECTOR UMCE Annual 23 88,104.0442 92,509.2516 97,134.7153 101,991.4459 107,091.0188 112,445.5743 115,256.7134 118,138.1353 Monthly 7,342.0037 7,709.1043 8,094.5596 8,499.2872 8,924.2516 9,370.4645 9,604.7261 9,844.8446Bi-weekly 3,388.6171 3,558.0481 3,735.9506 3,922.7479 4,118.8853 4,324.8298 4,432.9505 4,543.7744Hourly 42.3577 44.4756 46.6994 49.0343 51.4861 54.0604 55.4119 56.7972 COMMUNITY DEVELOPMENT DIRECTOR UMCE Annual 32 176,120.3848 184,926.4069 194,172.7226 203,881.3645 214,075.4374 224,779.2104 230,398.6869 236,158.6598 Monthly 14,676.6987 15,410.5339 16,181.0602 16,990.1137 17,839.6198 18,731.6009 19,199.8906 19,679.8883Bi-weekly 6,773.8610 7,112.5541 7,468.1816 7,841.5909 8,233.6707 8,645.3542 8,861.4880 9,083.0254Hourly 84.6733 88.9069 93.3523 98.0199 102.9209 108.0669 110.7686 113.5378 COMMUNITY DEVELOPMENT TECHNICIAN TEAM A Annual 19 64,759.1094 67,997.0643 71,396.9141 74,966.7638 78,715.0991 82,650.8552 84,717.1304 86,835.0569 Monthly 5,396.5925 5,666.4220 5,949.7428 6,247.2303 6,559.5916 6,887.5713 7,059.7609 7,236.2547Bi-weekly 2,490.7350 2,615.2717 2,746.0352 2,883.3371 3,027.5038 3,178.8790 3,258.3512 3,339.8099Hourly 31.1342 32.6909 34.3254 36.0417 37.8438 39.7360 40.7294 41.7476 UMCE Annual 28 129,453.7894 135,926.4789 142,722.8028 149,858.9429 157,351.8901 165,219.4846 169,349.9717 173,583.7210 Monthly 10,787.8158 11,327.2066 11,893.5669 12,488.2452 13,112.6575 13,768.2904 14,112.4976 14,465.3101Bi-weekly 4,978.9919 5,227.9415 5,489.3386 5,763.8055 6,051.9958 6,354.5956 6,513.4605 6,676.2970Hourly 62.2374 65.3493 68.6167 72.0476 75.6499 79.4324 81.4183 83.4537 ENGINEER UMCE Annual 26 110,985.7189 116,535.0049 122,361.7557 128,479.8412 134,903.8344 141,649.0232 145,190.2457 148,820.0018 Monthly 9,248.8099 9,711.2504 10,196.8130 10,706.6534 11,241.9862 11,804.0853 12,099.1871 12,401.6668Bi-weekly 4,268.6815 4,482.1156 4,706.2214 4,941.5324 5,188.6090 5,448.0394 5,584.2402 5,723.8462Hourly 53.3585 56.0264 58.8278 61.7692 64.8576 68.1005 69.8030 71.5481 ENGINEERING TECHNICIAN I TEAM A Annual 18 59,962.1354 62,960.2456 66,108.2602 69,413.6732 72,884.3591 76,528.5731 78,441.7848 80,402.8317 Monthly 4,996.8446 5,246.6871 5,509.0217 5,784.4728 6,073.6966 6,377.3811 6,536.8154 6,700.2360Bi-weekly 2,306.2360 2,421.5479 2,542.6254 2,669.7567 2,803.2446 2,943.4067 3,016.9917 3,092.4166Hourly 28.8279 30.2693 31.7828 33.3720 35.0406 36.7926 37.7124 38.6552

DEPUTY PUBLIC WORKS DIRECTOR
3 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 ENGINEERING TECHNICIAN II/GIS ADMINISTRATOR UMCE Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 EXECUTIVE AIDE UMCE Annual 19 64,759.1094 67,997.0643 71,396.9141 74,966.7638 78,715.0991 82,650.8552 84,717.1304 86,835.0569 Monthly 5,396.5925 5,666.4220 5,949.7428 6,247.2303 6,559.5916 6,887.5713 7,059.7609 7,236.2547Bi-weekly 2,490.7350 2,615.2717 2,746.0352 2,883.3371 3,027.5038 3,178.8790 3,258.3512 3,339.8099Hourly 31.1342 32.6909 34.3254 36.0417 37.8438 39.7360 40.7294 41.7476 EXECUTIVE ASSISTANT UMCE Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212TO THE CITY MANAGER Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684 Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 FACILITY MAINTENANCE COORDINATOR TEAM PW Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 FINANCE DIRECTOR UMCE Annual 32 176,120.3848 184,926.4069 194,172.7226 203,881.3645 214,075.4374 224,779.2104 230,398.6869 236,158.6598 Monthly 14,676.6987 15,410.5339 16,181.0602 16,990.1137 17,839.6198 18,731.6009 19,199.8906 19,679.8883Bi-weekly 6,773.8610 7,112.5541 7,468.1816 7,841.5909 8,233.6707 8,645.3542 8,861.4880 9,083.0254Hourly 84.6733 88.9069 93.3523 98.0199 102.9209 108.0669 110.7686 113.5378 FINANCE MANAGER UMCE Annual 27 119,864.6198 125,857.8508 132,150.7433 138,758.2805 145,696.1945 152,981.0043 156,805.5294 160,725.6676 Monthly 9,988.7183 10,488.1542 11,012.5619 11,563.1900 12,141.3495 12,748.4170 13,067.1274 13,393.8056Bi-weekly 4,610.1777 4,840.6866 5,082.7209 5,336.8569 5,603.6998 5,883.8848 6,030.9819 6,181.7564Hourly 57.6272 60.5086 63.5340 66.7107 70.0462 73.5486 75.3873 77.2720 FIRE BATTALION CHIEF USFMC Annual FIRE 14 152,426.0882 160,047.3909 168,049.7610 176,452.2450 185,274.8573 194,538.6002 204,265.5302 214,478.8067 Monthly 12,702.1740 13,337.2826 14,004.1468 14,704.3538 15,439.5714 16,211.5500 17,022.1275 17,873.2339Bi-weekly 5,862.5419 6,155.6689 6,463.4523 6,786.6248 7,125.9560 7,482.2539 7,856.3665 8,249.184940-hour 73.2818 76.9459 80.7932 84.8328 89.0745 93.5282 98.2046 103.114856-hour 52.3441 54.9613 57.7094 60.5949 63.6246 66.8058 70.1461 73.6534 4 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 FIRE CAPTAIN LLPFF Annual FIRE 8 113,742.7047 119,429.8354 125,401.3254 131,671.3905 138,254.9601 145,167.7081 152,426.0935 160,047.3981 Monthly 9,478.5587 9,952.4863 10,450.1105 10,972.6159 11,521.2467 12,097.3090 12,702.1745 13,337.2832Bi-weekly 4,374.7194 4,593.4552 4,823.1279 5,064.2843 5,317.4985 5,583.3734 5,862.5421 6,155.669240-hour 54.6840 57.4182 60.2891 63.3036 66.4687 69.7922 73.2818 76.945956-hour 39.0600 41.0130 43.0636 45.2168 47.4777 49.8515 52.3441 54.9613 FIRE CHIEF USFMC Annual 33 201,379.8514 211,448.8421 222,021.2848 233,122.3490 244,778.4616 257,017.3798 263,442.8161 270,028.8884 Monthly 16,781.6543 17,620.7368 18,501.7737 19,426.8624 20,398.2051 21,418.1150 21,953.5680 22,502.4074Bi-weekly 7,745.3789 8,132.6478 8,539.2802 8,966.2442 9,414.5562 9,885.2838 10,132.4160 10,385.726540-hour 96.8172 101.6581 106.7410 112.0781 117.6820 123.5660 126.6552 129.821656-hour 69.1552 72.6129 76.2436 80.0558 84.0585 88.2615 90.4680 92.7297 FIRE ENGINEER LLPFF Annual FIRE 6 103,167.9911 108,326.3866 113,742.7047 119,429.8354 125,401.3271 131,671.3935 138,254.9632 145,167.7113 Monthly 8,597.3326 9,027.1989 9,478.5587 9,952.4863 10,450.1106 10,972.6161 11,521.2469 12,097.3093Bi-weekly 3,967.9997 4,166.3995 4,374.7194 4,593.4552 4,823.1280 5,064.2844 5,317.4986 5,583.373540-hour 49.6000 52.0800 54.6840 57.4182 60.2891 63.3036 66.4687 69.792256-hour 35.4286 37.2000 39.0600 41.0130 43.0636 45.2168 47.4777 49.8515 FIRE MARSHAL USFMC Annual FIRE 13.5 145,167.7058 152,426.0882 160,047.3909 168,049.7610 176,452.2450 185,274.8573 194,538.6002 199,402.0652 Monthly 12,097.3088 12,702.1740 13,337.2826 14,004.1468 14,704.3538 15,439.5714 16,211.5500 16,616.8388Bi-weekly 5,583.3733 5,862.5419 6,155.6689 6,463.4523 6,786.6248 7,125.9560 7,482.2539 7,669.310240-hour 69.7922 73.2818 76.9459 80.7932 84.8328 89.0745 93.5282 95.866456-hour 49.8515 52.3441 54.9613 57.7094 60.5949 63.6246 66.8058 68.4760 FIREFIGHTER/PARAMEDIC LLPFF Annual FIRE 4 93,576.4065 98,255.2279 103,167.9911 108,326.3866 113,742.7059 119,429.8412 125,401.3333 131,671.3999 Monthly 7,798.0339 8,187.9357 8,597.3326 9,027.1989 9,478.5588 9,952.4868 10,450.1111 10,972.6167Bi-weekly 3,599.0926 3,779.0472 3,967.9997 4,166.3995 4,374.7195 4,593.4554 4,823.1282 5,064.284640-hour 44.9887 47.2381 49.6000 52.0800 54.6840 57.4182 60.2891 63.303656-hour 32.1348 33.7415 35.4286 37.2000 39.0600 41.0130 43.0636 45.2168 FIRE PREVENTION INSPECTOR TEAM A Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 5 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 HELP DESK TECHNICIAN TEAM A Annual 18 59,962.1354 62,960.2456 66,108.2602 69,413.6732 72,884.3591 76,528.5731 78,441.7848 80,402.8317 Monthly 4,996.8446 5,246.6871 5,509.0217 5,784.4728 6,073.6966 6,377.3811 6,536.8154 6,700.2360Bi-weekly 2,306.2360 2,421.5479 2,542.6254 2,669.7567 2,803.2446 2,943.4067 3,016.9917 3,092.4166Hourly 28.8279 30.2693 31.7828 33.3720 35.0406 36.7926 37.7124 38.6552 HUMAN RESOURCES - RISK ANALYST UMCE Annual 23 88,104.0442 92,509.2516 97,134.7153 101,991.4459 107,091.0188 112,445.5743 115,256.7134 118,138.1353 Monthly 7,342.0037 7,709.1043 8,094.5596 8,499.2872 8,924.2516 9,370.4645 9,604.7261 9,844.8446Bi-weekly 3,388.6171 3,558.0481 3,735.9506 3,922.7479 4,118.8853 4,324.8298 4,432.9505 4,543.7744Hourly 42.3577 44.4756 46.6994 49.0343 51.4861 54.0604 55.4119 56.7972 INFORMATION TECHNOLOGY SPECIALIST TEAM A Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 INFORMATION TECHNOLOGY ANALYST UMCE Annual 23 88,104.0442 92,509.2516 97,134.7153 101,991.4459 107,091.0188 112,445.5743 115,256.7134 118,138.1353 Monthly 7,342.0037 7,709.1043 8,094.5596 8,499.2872 8,924.2516 9,370.4645 9,604.7261 9,844.8446Bi-weekly 3,388.6171 3,558.0481 3,735.9506 3,922.7479 4,118.8853 4,324.8298 4,432.9505 4,543.7744Hourly 42.3577 44.4756 46.6994 49.0343 51.4861 54.0604 55.4119 56.7972 INFORMATION TECHNOLOGY ANALYST IV UMCE Annual 25 102,764.5567 107,902.7874 113,297.9262 118,962.8283 124,910.9714 131,156.5252 134,435.4438 137,796.3244 Monthly 8,563.7131 8,991.8990 9,441.4939 9,913.5690 10,409.2476 10,929.7104 11,202.9537 11,483.0270Bi-weekly 3,952.4830 4,150.1072 4,357.6125 4,575.4934 4,804.2681 5,044.4817 5,170.5940 5,299.8586Hourly 49.4060 51.8763 54.4702 57.1937 60.0534 63.0560 64.6324 66.2482 INFORMATION TECHNOLOGY MANAGER UMCE Annual 26 110,985.7189 116,535.0049 122,361.7557 128,479.8412 134,903.8344 141,649.0232 145,190.2457 148,820.0018 Monthly 9,248.8099 9,711.2504 10,196.8130 10,706.6534 11,241.9862 11,804.0853 12,099.1871 12,401.6668Bi-weekly 4,268.6815 4,482.1156 4,706.2214 4,941.5324 5,188.6090 5,448.0394 5,584.2402 5,723.8462Hourly 53.3585 56.0264 58.8278 61.7692 64.8576 68.1005 69.8030 71.5481 6 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 LEAD MECHANIC/FLEET MAINTENANCE COORDINATOR TEAM PW Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 LEAD PUBLIC WORKS MAINTENANCE WORKER TEAM PW Annual 19 64,759.1094 67,997.0643 71,396.9141 74,966.7638 78,715.0991 82,650.8552 84,717.1304 86,835.0569 Monthly 5,396.5925 5,666.4220 5,949.7428 6,247.2303 6,559.5916 6,887.5713 7,059.7609 7,236.2547Bi-weekly 2,490.7350 2,615.2717 2,746.0352 2,883.3371 3,027.5038 3,178.8790 3,258.3512 3,339.8099Hourly 31.1342 32.6909 34.3254 36.0417 37.8438 39.7360 40.7294 41.7476 LEAD UTILITIES MAINTENANCE TECHNICIAN TEAM PW Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 LEAD WATER PRODUCTION OPERATOR TEAM PW Annual 22 81,577.8204 85,656.7132 89,939.5482 94,436.5291 99,158.3550 104,116.2785 106,719.1863 109,387.1657 Monthly 6,798.1517 7,138.0594 7,494.9624 7,869.7108 8,263.1962 8,676.3565 8,893.2655 9,115.5971Bi-weekly 3,137.6085 3,294.4890 3,459.2134 3,632.1742 3,813.7829 4,004.4723 4,104.5841 4,207.1987Hourly 39.2201 41.1811 43.2402 45.4022 47.6723 50.0559 51.3073 52.5900 MAINTENANCE AIDE TEAM PW Annual 15 47,599.8811 49,979.8794 52,478.8734 55,102.8222 57,857.9633 60,750.8569 62,269.6271 63,826.3635 Monthly 3,966.6568 4,164.9899 4,373.2394 4,591.9019 4,821.4969 5,062.5714 5,189.1356 5,318.8636Bi-weekly 1,830.7647 1,922.3031 2,018.4182 2,119.3393 2,225.3063 2,336.5714 2,394.9857 2,454.8601Hourly 22.8846 24.0288 25.2302 26.4917 27.8163 29.2071 29.9373 30.6858 PARKING CONTROL OFFICERSPECIAL EVENTS

COORDINATOR
TEAM A Annual 16 51,407.8677 53,978.2628 56,677.1754 59,511.0388 62,486.5861 65,610.9194 67,251.1973 68,932.4735 Monthly 4,283.9890 4,498.1886 4,723.0979 4,959.2532 5,207.2155 5,467.5766 5,604.2664 5,744.3728Bi-weekly 1,977.2257 2,076.0870 2,179.8914 2,288.8861 2,403.3302 2,523.4969 2,586.5845 2,651.2490Hourly 24.7153 25.9511 27.2486 28.6111 30.0416 31.5437 32.3323 33.1406 7 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 PARKING ENFORCEMENT/ANIMAL CONTROL OFFICER TEAM A Annual 18 59,962.1354 62,960.2456 66,108.2602 69,413.6732 72,884.3591 76,528.5731 78,441.7848 80,402.8317 Monthly 4,996.8446 5,246.6871 5,509.0217 5,784.4728 6,073.6966 6,377.3811 6,536.8154 6,700.2360Bi-weekly 2,306.2360 2,421.5479 2,542.6254 2,669.7567 2,803.2446 2,943.4067 3,016.9917 3,092.4166Hourly 28.8279 30.2693 31.7828 33.3720 35.0406 36.7926 37.7124 38.6552 PUBLIC WORKS MAINTENANCE WORKER I TEAM PW Annual 15 47,599.8811 49,979.8794 52,478.8734 55,102.8222 57,857.9633 60,750.8569 62,269.6271 63,826.3635 Monthly 3,966.6568 4,164.9899 4,373.2394 4,591.9019 4,821.4969 5,062.5714 5,189.1356 5,318.8636Bi-weekly 1,830.7647 1,922.3031 2,018.4182 2,119.3393 2,225.3063 2,336.5714 2,394.9857 2,454.8601Hourly 22.8846 24.0288 25.2302 26.4917 27.8163 29.2071 29.9373 30.6858 PUBLIC WORKS MAINTENANCE WORKER II TEAM PW Annual 18 59,962.1354 62,960.2456 66,108.2602 69,413.6732 72,884.3591 76,528.5731 78,441.7848 80,402.8317 Monthly 4,996.8446 5,246.6871 5,509.0217 5,784.4728 6,073.6966 6,377.3811 6,536.8154 6,700.2360Bi-weekly 2,306.2360 2,421.5479 2,542.6254 2,669.7567 2,803.2446 2,943.4067 3,016.9917 3,092.4166Hourly 28.8279 30.2693 31.7828 33.3720 35.0406 36.7926 37.7124 38.6552 PUBLIC WORKS DIRECTOR/CITY ENGINEER UMCE Annual 32 176,120.3848 184,926.4069 194,172.7226 203,881.3645 214,075.4374 224,779.2104 230,398.6869 236,158.6598 Monthly 14,676.6987 15,410.5339 16,181.0602 16,990.1137 17,839.6198 18,731.6009 19,199.8906 19,679.8883Bi-weekly 6,773.8610 7,112.5541 7,468.1816 7,841.5909 8,233.6707 8,645.3542 8,861.4880 9,083.0254Hourly 84.6733 88.9069 93.3523 98.0199 102.9209 108.0669 110.7686 113.5378 PUBLIC WORKS SUPERINTENDENT UMCE Annual 26 110,985.7189 116,535.0049 122,361.7557 128,479.8412 134,903.8344 141,649.0232 145,190.2457 148,820.0018 Monthly 9,248.8099 9,711.2504 10,196.8130 10,706.6534 11,241.9862 11,804.0853 12,099.1871 12,401.6668Bi-weekly 4,268.6815 4,482.1156 4,706.2214 4,941.5324 5,188.6090 5,448.0394 5,584.2402 5,723.8462Hourly 53.3585 56.0264 58.8278 61.7692 64.8576 68.1005 69.8030 71.5481

SENIOR ACCOUNTANT/FINANCIAL ANALYST
UMCE Annual 24 95,152.3677 99,909.9861 104,905.4854 110,150.7597 115,658.2977 121,441.2126 124,477.2429 127,589.1740 Monthly 7,929.3640 8,325.8322 8,742.1238 9,179.2300 9,638.1915 10,120.1010 10,373.1036 10,632.4312Bi-weekly 3,659.7065 3,842.6918 4,034.8264 4,236.5677 4,448.3961 4,670.8159 4,787.5863 4,907.2759Hourly 45.7463 48.0336 50.4353 52.9571 55.6050 58.3852 59.8448 61.3409 8 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 SENIOR CENTER MANAGER UMCE Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 SENIOR CODE ENFORCEMENT OFFICER UMCE Annual 20 69,939.8373 73,436.8331 77,108.6713 80,964.1026 85,012.3043 89,262.9149 91,494.4860 93,781.8476 Monthly 5,828.3198 6,119.7361 6,425.7226 6,747.0086 7,084.3587 7,438.5762 7,624.5405 7,815.1540Bi-weekly 2,689.9937 2,824.4936 2,965.7181 3,114.0039 3,269.7040 3,433.1890 3,519.0187 3,606.9941Hourly 33.6249 35.3062 37.0715 38.9250 40.8713 42.9149 43.9877 45.0874 SENIOR PLANNER UMCE Annual 25 102,764.5567 107,902.7874 113,297.9262 118,962.8283 124,910.9714 131,156.5252 134,435.4438 137,796.3244 Monthly 8,563.7131 8,991.8990 9,441.4939 9,913.5690 10,409.2476 10,929.7104 11,202.9537 11,483.0270Bi-weekly 3,952.4830 4,150.1072 4,357.6125 4,575.4934 4,804.2681 5,044.4817 5,170.5940 5,299.8586Hourly 49.4060 51.8763 54.4702 57.1937 60.0534 63.0560 64.6324 66.2482 STUDENT INTERN PT Annual 1 35,152.0000
Monthly 2,929.3333Bi-weekly 1,352.0000Hourly 16.9000
SUPERVISING ACCOUNTING TECHNICIAN UMCE Annual 21 75,535.0215 79,311.7766 83,277.3706 87,441.2345 91,813.2951 96,403.9633 98,814.0661 101,284.4212 Monthly 6,294.5851 6,609.3147 6,939.7809 7,286.7695 7,651.1079 8,033.6636 8,234.5055 8,440.3684Bi-weekly 2,905.1931 3,050.4529 3,202.9758 3,363.1244 3,531.2806 3,707.8447 3,800.5410 3,895.5547Hourly 36.3149 38.1307 40.0372 42.0391 44.1410 46.3481 47.5068 48.6944 UTILITIES MAINTENANCE TECHNICIAN I TEAM PW Annual 17 55,520.4953 58,296.5160 61,211.3383 64,271.9030 67,485.4964 70,859.7741 72,631.2673 74,447.0446 Monthly 4,626.7079 4,858.0430 5,100.9449 5,355.9919 5,623.7914 5,904.9812 6,052.6056 6,203.9204Bi-weekly 2,135.4037 2,242.1737 2,354.2822 2,471.9963 2,595.5960 2,725.3759 2,793.5103 2,863.3479Hourly 26.6925 28.0272 29.4285 30.9000 32.4450 34.0672 34.9189 35.7918 UTILITIES MAINTENANCE TECHNICIAN II TEAM PW Annual 20 69,939.8373 73,436.8331 77,108.6713 80,964.1026 85,012.3043 89,262.9149 91,494.4860 93,781.8476 Monthly 5,828.3198 6,119.7361 6,425.7226 6,747.0086 7,084.3587 7,438.5762 7,624.5405 7,815.1540Bi-weekly 2,689.9937 2,824.4936 2,965.7181 3,114.0039 3,269.7040 3,433.1890 3,519.0187 3,606.9941Hourly 33.6249 35.3062 37.0715 38.9250 40.8713 42.9149 43.9877 45.0874 9 of 10

CITY OF LOMA LINDA
Pay Schedule By Classification
Fiscal Year 2026/2027
Effective July 1, 2026
Revised: June 1, 2026
TITLE UNIT PAY TYPE GRADE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 UTILITIES SUPERINTENDENT UMCE Annual 26 110,985.7189 116,535.0049 122,361.7557 128,479.8412 134,903.8344 141,649.0232 145,190.2457 148,820.0018 Monthly 9,248.8099 9,711.2504 10,196.8130 10,706.6534 11,241.9862 11,804.0853 12,099.1871 12,401.6668Bi-weekly 4,268.6815 4,482.1156 4,706.2214 4,941.5324 5,188.6090 5,448.0394 5,584.2402 5,723.8462Hourly 53.3585 56.0264 58.8278 61.7692 64.8576 68.1005 69.8030 71.5481 WATER PRODUCTION OPERATOR I TEAM PW Annual 18 59,962.1354 62,960.2456 66,108.2602 69,413.6732 72,884.3591 76,528.5731 78,441.7848 80,402.8317 Monthly 4,996.8446 5,246.6871 5,509.0217 5,784.4728 6,073.6966 6,377.3811 6,536.8154 6,700.2360Bi-weekly 2,306.2360 2,421.5479 2,542.6254 2,669.7567 2,803.2446 2,943.4067 3,016.9917 3,092.4166Hourly 28.8279 30.2693 31.7828 33.3720 35.0406 36.7926 37.7124 38.6552 WATER PRODUCTION OPERATOR II TEAM PW Annual 20 69,939.8373 73,436.8331 77,108.6713 80,964.1026 85,012.3043 89,262.9149 91,494.4860 93,781.8476 Monthly 5,828.3198 6,119.7361 6,425.7226 6,747.0086 7,084.3587 7,438.5762 7,624.5405 7,815.1540Bi-weekly 2,689.9937 2,824.4936 2,965.7181 3,114.0039 3,269.7040 3,433.1890 3,519.0187 3,606.9941Hourly 33.6249 35.3062 37.0715 38.9250 40.8713 42.9149 43.9877 45.0874 WATER PRODUCTION SUPERINTENDENT UMCE Annual 26 110,985.7189 116,535.0049 122,361.7557 128,479.8412 134,903.8344 141,649.0232 145,190.2457 148,820.0018 Monthly 9,248.8099 9,711.2504 10,196.8130 10,706.6534 11,241.9862 11,804.0853 12,099.1871 12,401.6668Bi-weekly 4,268.6815 4,482.1156 4,706.2214 4,941.5324 5,188.6090 5,448.0394 5,584.2402 5,723.8462Hourly 53.3585 56.0264 58.8278 61.7692 64.8576 68.1005 69.8030 71.5481

UNIT LEGEND
Unrepresented Miscellaneous Management/Confidential Employees (UMCE)Teamsters - Administrative (TEAM A)Teamsters - Public Works (TEAM PW)Loma Linda Professional Firefighters (LLPFF)Unrepresented Safety Fire Management/Confidential Employees (USFMCE) 10 of 10
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LOMA

LINDA, CALIFORNIA, UPDATING THE MISCELLANEOUS AND FIRE
SALARY SCHEDULES EFFECTIVE JULY 1, 2026
WHEREAS, the City of Loma Linda ("City") contracts with the California Public Employees' Retirement System ("CalPERS") to provide retirement benefits for its employees; and
WHEREAS, California Code of Regulations, Title 2, Section 570.5 requires governing bodies of local agencies contracting with CalPERS to approve and adopt a publicly available pay schedule in accordance with public meeting laws; and WHEREAS, the pay schedule must identify each position by title, the individual pay rate amount or ranges for that position, and the time base upon which the amounts are based; WHEREAS, the Loma Linda Professional and Administrative Employees Association (LLPAEA), Loma Linda Public Works Employees Association (LLPWEA), Loma Linda Professional Firefighters (LLPF), Unrepresented Safety Fire Management/Confidential Employees (USFMCE), and Unrepresented Miscellaneous Management/Confidential Employees (UMCE) previously negotiated cost of living increases effective the first pay period of July 2026; and
WHEREAS, the City desires to update its salary schedule to reflect these approved compensation adjustments.

NOW THEREFORE, BE THE LOMA LINDA CITY COUNCIL DOES HEREBY FIND, DETERMINE, AND RESOLVE AS FOLLOWS:

Section 1: This Resolution shall take the place of all existing Resolutions or orders of the City Council as they relate to the subject matter contained herein. However, in no event shall this Resolution rescind, supersede, alter or in any way, regarding subject matter that is not contained in this Resolution. In the event that any provision of this Resolution is in conflict with an employment contract of an unrepresented and/or unaffiliated City employee, the applicable employment contract shall supersede and govern the City’s policies and practices with regard to that particular employee.

Section 2: The pay schedule for all employees of the City, which shall be effective July 1, 2026, is hereby updated in the Salary Table, attached hereto as Exhibit A.

Resolution No.

Page 2 ends

PASSED AND ADOPTED by the City Council of Loma Linda, California this 9th day of June, 2026, by the attached vote.

Phillip Dupper, Mayor
ATTEST:

Lynette Arreola, City Clerk
Resolution No.

Page 3 ends

CERTIFIED VOTE
I, Lynette Arreola, City Clerk of the City of Loma Linda, State of California, do hereby certify that the foregoing Resolution No. XXX was duly adopted by the City Council at a meeting thereof held on the 9th day of June 2026, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF I have hereto set my hand or affixed the Seal of the City of Loma Linda this 9th day of June 2026.

Lynette Arreola, City Clerk
City of Loma Linda
City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
E. Consider Approving Amendment No. 9 to Waste Disposal Agreement No. 98-745 with the County of San Bernardino (Public Works) [CC]
Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3E.

To
City Council
From
John Trujillo, Deputy Director Public Works
Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

It is recommended that the City Council:

1. Approve Amendment No. 9 to the Waste Disposal Agreement No. 98-745 with the County of San Bernardino; and

2. Authorize the City Manager or his designee to execute the agreement, subject to any revisions to the agreement deemed necessary by the City Attorney.

This Agreement shall become effective, shall be in full force and effect and shall be legally binding upon the City and the County from the contract date and shall continue in full force and effect until June 30, 2035, unless earlier terminated in accordance with its terms..

BACKGROUND:

The City of Loma Linda entered into a Waste Disposal Agreement (WDA) with the County of San Bernardino on August 25, 1998, establishing terms and conditions for solid waste disposal services within the County disposal system. The Agreement has been amended several times over the years to address changes in disposal rates, revenue sharing provisions, and agreement terms. The County has now proposed Amendment No. 9 for consideration and approval by all participating WDA cities.

ANALYSIS:

The proposed Amendment No. 9 to the Waste Disposal Agreement extends the current agreement term through June 30, 2035, and revises the contract rate methodology for participating WDA cities. Effective July 1, 2026, the WDA disposal rate will be established at $41.08 per ton, based on 83% of the County’s posted gate rate, replacing the previous annual adjustment calculation methodology. Future rate adjustments will continue to be tied directly to the county’s posted gate rate.

The amendment is intended to provide a streamlined and predictable rate structure for participating agencies while maintaining continued participation within the County’s waste disposal system and supporting long-term disposal planning.

ENVIRONMENTAL IMPACT:

Funding for this service is provided in Account No. 0013600-51830. The revised WDA disposal rate of $41.08 per ton is a pass through fee effective July 1, 2026, Associated disposal costs will continue to be incorporated into annual solid waste service rates.

FINANCIAL IMPACT:

N/A
Attachments
AMENDMENT NO. 9 WDA 98-745.pdf
AMENDMENT NO. 9 TO THE
WASTE DISPOSAL AGREEMENT NO. 98-745
On August 25, 1998, the City of Loma Linda (“City”) and the County of San Bernardino (“County”) entered into a Waste Disposal Agreement (“WDA”). The parties hereby amend the WDA, on the Effective Date as provided herein, by their respective execution of this agreement (hereinafter “Amendment’).

Recitals
A. The parties have previously entered into the following amendments to the WDA. Amendment No. 1 to the WDA was to implement the “Article 19 Solid Waste” component of the County’s waste management system and define the City’s share of that revenue. Amendment No. 2 was to increase the annual maximum limits of “Article 19 Solid Waste” in the County landfill system. Amendment No. 3 allowed the County to charge the fee of $10.00 per ton (prorated) for identified controllable waste of the City (e.g., roll off container trucks and other County/City vehicles such as pickups and dump trucks) and have such waste subject to being processed in the recycling program. Amendment No. 4 allowed the County to calculate the annual cost of living adjustment earlier in the calendar year. Amendment No. 5 extended the end date of the WDA to June 30, 2016. Amendment No. 6 extended the term of the WDA to June 30, 2021, applied an annual fixed WDA renewal discount adjustment of $0.82 per ton for the term of the WDA, and allowed the County to enter into agreements to accept in-County waste from non-WDA users of the Disposal System at a rate lower than the WDA Contract Rate in exchange for sharing the net revenue generated from those agreements. Amendment No. 7 reset the WDA Contract Rate and extended the term five (5) years to June 30, 2026. Amendment No. 8 capped the WDA Contract Rate in order to maintain a 15% buffer between the WDA Contract Rate and the County’s posted gate rate.

B. In connection with the ongoing administration of the WDA, the parties have determined it is now in their best interests to extend the term 9 years to June 30, 2035, adjust the WDA Contract Rate to be equal to 83% of the County’s posted gate rate, and eliminate the provision for annual adjustments.

NOW THEREFORE, in consideration of the forgoing recitals and the following covenants and promises the Parties agree as follows:

1. Section 4.2, entitled “CONTRACT RATE” is hereby deleted and replaced in its entirety to read:

SECTION 4.2 CONTRACT RATE. Effective July 1, 2026, and each July 1 thereafter during the term of the Agreement, the Contract Rate shall be equal to 83% of the County’s posted gate rate effective that July 1st. For July 1, 2026, the County’s posted gate rate is $49.49 ($61.49 minus the $12 CDSDP fee); therefore, the WDA Rate, effective July 1, 2026, will be $41.08 per ton.

Please note that, due to timing, in future years where the gate rate is recommended to be increased, the WDA rate notification letter may be delayed until final approval of the gate rate by the Board of Supervisors.

2. Section 5.2, entitled “CITY CONVENIENCE TERMINATION” is hereby deleted and replaced in its entirety to read:

SECTION 5.2 CITY CONVENIENCE TERMINATION. In exchange for adjusting the WDA Contract Rate to be equal to 83% of the County’s posted gate rate, the City agrees to commit to remaining a WDA City, with no provision to terminate without cause, for the remainder of the WDA Term.

3. Section 6.1, entitled “EFFECTIVE DATE AND TERM”, paragraph (A) Term, is deleted and replaced in its entirety to read:

SECTION 6.1. EFFECTIVE DATE AND TERM. (A) Term. This Agreement shall become effective, shall be in full force and effect and shall be legally binding upon the City and the County from the Contract Date and shall continue in full force and effect until June 30, 2035, unless earlier terminated in accordance with its terms.

4. Effective Date. This Amendment shall be effective if and only when all fifteen cities/towns listed on Exhibit A have each adopted and executed a counterpart of this Amendment No. 9 (the amendment number may differ for each city/town listed on Exhibit A) and such amendment has been adopted and executed by the County on or before June 30, 2026. In all events, the conditions in the forgoing sentence shall occur otherwise this Amendment No. 9 shall be null and void and without any effect whatsoever.

5. This Amendment may be executed in any number of counterparts, each of which so executed shall be deemed to be an original, and such counterparts shall together constitute one and the same Amendment.

The parties shall be entitled to sign and transmit an electronic signature of this Amendment (whether by facsimile, PDF or other email transmission), which signature shall be binding on the party whose name is contained therein. Each party providing an electronic signature agrees to promptly execute and deliver to the other party an original signed Amendment upon request.

6. Except as modified in this Amendment (or in any prior Amendment(s)) all other terms and conditions of the WDA shall remain in full force and effect.
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
IN WITNESS WHEREOF, San Bernardino County and the City have each caused this Amendment to be subscribed by its respective duly authorized persons, on its behalf.

SAN BERNARDINO COUNTY City of Loma Linda
(Print or type name of corporation, company, contractor, etc.) By
Dawn Rowe, Chair, Board of Supervisors (Authorized signature - sign in blue ink) Dated: Name
SIGNED AND CERTIFIED THAT A COPY OF THIS (Print or type name of person signing contract)

DOCUMENT HAS BEEN DELIVERED TO THE
CHAIRMAN OF THE BOARD Title
Lynna Monell
Clerk of the Board of Supervisors
of San Bernardino County
(Print or Type)
By Dated:

Deputy
Address 25541 Barton Road
Loma Linda, CA 92354

EXHIBIT A

CITIES/TOWNS WITH A WASTE DELIVERY AGREEMENT

WITH THE COUNTY OF SAN BERNARDINO
OFFERED THIS AMENDMENT JUNE 2026
FOR AN AGREEMENT END DATE OF JUNE 30, 2035

1. ADELANTO

2. APPLE VALLEY

3. BARSTOW

4. BIG BEAR LAKE

5. COLTON

6. FONTANA

7. GRAND TERRACE

8. HESPERIA

9. HIGHLAND

10. LOMA LINDA

11. RIALTO

12. TWENTYNINE PALMS

13. VICTORVILLE

14. YUCAIPA

15. YUCCA VALLEY
City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
F. Consider Approving Agreement Renewal of Managed Service Provider (MSP) Services with Synoptek for $207,465.72 for Fiscal Year 2026-2027 (Information Technology) [CC] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3F.

To
City Council
From
Kyle MacGavin, Information Systems Manager
RECOMMENDATION:

It is recommended that City Council:

1. Approve the one year agreement renewal for managed service provider (MSP) services to Synoptek in the amount of $207,465.72, subject to any revisions to the agreement deemed necessary by the City Attorney; and

2. Authorize the City Manager or his designee to execute all necessary documents.

BACKGROUND:

Cyber-security is a main concern for Information Technology departments of every organization. With ever-growing and evolving digital threats, it is impossible for smaller organizations to stay on the edge of cyber-security without third party, MSP support. The City has been utilizing Synoptek for their Cyber-Security Operations Center (SOC) and Network Operations Center (NOC) for the last three years to stay ahead of threats. The City has benefited from this protection, and has decided it would be best to renew this service for an additional one year.

ANALYSIS:

When service with Syntoptek was originally implemented, the City utilized a service called PRISIM-Risk which competitively pre-negotiates pricing on services. Synoptek is no longer registered with PRISIM-Risk, but will continue to honor PRISIM-Risk's competitive pricing. The municipal code "Exemptions from competitive bidding" §

3.32.260 section A, "The commodity can be obtained from only one vendor or source;" and section D, "The commodity in question is a professional consulting service" will be exercised due to their sole hands-on understanding of The City's current IT infrastructure and consulting of The City's technology environment.

ENVIRONMENTAL IMPACT:

N/A
FINANCIAL IMPACT:

Funds have been budgeted in FY 2026-2027 and are allocated among departmental expenditure accounts citywide through account no. 51830 (Contractual Agreements).

Attachments
CoLL_12-Month Managed Services Renewal 2026.pdf
Synoptek, LLC.

Pacific Arts Plaza
611 Anton Blvd., Suite #925
Costa Mesa, CA 92626
888-796-6783
www.synoptek.com
Proposal for
2026 12-Month Managed Services Renewal
# 18146
25541 Barton Road Loma Linda, CA 92354
Tel: 909-799-2800 W: lomalinda-ca.gov
6/2/2026
January 13, 2020
2 Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability.

Table of Contents
Cover Letter ..........................................................................................................................................................3 Scope of Services.................................................................................................................................................4 Assumptions and Terms & Conditions..................................................................................................................9 Pricing.................................................................................................................................................................11 Approval .............................................................................................................................................................13 Section F: Appendix ...................................................................................................................................................................14

Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 3 COVER LETTER
City of Loma Linda
Kyle Mac Gavin
Dear Kyle Mac Gavin
Synoptek is pleased to present this proposal for a 12-month renewal of Synoptek’s Managed Services starting July 1, 2026 and ending June 30, 2027.

Our proposal includes the following sections for your review:
• Scope of Services
• Assumptions
• Pricing
• Approval
On behalf of all our teams at Synoptek, we look forward to the opportunity to serve you. We are absolute in our confidence that our history of performance, expertise, company culture, and high attention to the end user’s experience will differentiate Synoptek from others in the market.

Synoptek is committed to providing the necessary professionals and resources to ensure the successful delivery of services contained in this proposal and will meet the requirements contained herein. We sincerely believe that our understanding of your current IT environment, combined with our ability to deliver these services will result in the best value for your organization.

This proposal will remain valid for 30 days from submittal, and is binding based on the material shared between both parties, as well as the assumptions enclosed.

Thank you for your consideration. If you have any questions or need additional information, please contact me directly.

Sincerely,
Stefan Laube
Client Technology Officer
Synoptek, LLC
[email protected]
Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 4 SCOPE OF SERVICES
Synoptek combines speed, agility, and simplicity to help organizations scale and manage their information technology infrastructure while reducing complexity and controlling costs. With access to experienced technology professionals, proven tools, and leading hardware and software solutions, Synoptek helps clients modernize and support their IT environments through a comprehensive service model.

Our managed services include 24x7 monitoring and management, supported cloud services, and backup and disaster recovery options delivered under service level agreements tailored to each client’s requirements.

Synoptek’s Managed IT Infrastructure Services provide comprehensive support for a fixed monthly fee. This model is designed to improve system performance and reliability while creating a more predictable, scalable, and cost-effective IT operating environment. Synoptek’s goal is to serve as a trusted advisor by delivering value, innovation, accountability, and integrity in every client engagement.

While Synoptek offers a broad range of services, not every capability may be applicable at this time. For additional information, many of these services are described in detail on our website at https://synoptek.com/synoptek-service-definitions/
Synoptek has reviewed the requirements for CITY OF LOMA LINDA and assembled a tailored set of services from our broader portfolio that we believe aligns with your goals and objectives. These services are outlined below.

IT Advisory Management, & Leadership
For Synoptek Managed Services clients, IT Advisory services are delivered through an assigned IT leader or virtual Client Technology Officer. This advisor serves as a senior technology partner who helps evolve the client’s IT environment and remains engaged throughout each phase of Synoptek’s Plan-Build-Run service delivery model. Because of their involvement across functional teams from the earliest stages of the engagement, the Client Advisor serves as a consistent point of leadership for strategic guidance, quality oversight, and issue resolution throughout the partnership. Synoptek’s IT Advisory services provide access to an experienced technology leader with a proven ability to align business needs with practical technology solutions. We begin by understanding your business objectives and then establish the processes, priorities, and governance needed to support both your technology environment and your users. IT Advisory Services are provided as a fixed number of hours per month based on the anticipated level of effort required to manage IT services and support expected business outcomes. Actual hours may vary depending on the scope of services provided, and additional hours are available upon request.

Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 5 Virtual Client Technology Officer
The virtual Client Technology Officer’s charter is to drive client satisfaction and business outcomes by providing strategic technology leadership, operational oversight, and aligned advisory services through the following responsibilities:
• Provide strategic IT leadership and management to help advance the client’s technology maturity and long-term capabilities
• Develop recommendations for a multi-year IT strategy and technology roadmap aligned to business objectives
• Serve as the client advocate across Synoptek teams to help ensure alignment, accountability, and service quality
• Lead periodic business and IT review meetings to assess performance, priorities, and upcoming initiatives
• Oversee service levels and risk management to support operational stability and informed decision-making
• Provide application, data, and business intelligence recommendations to support efficiency and business insight
Virtual Client Information Security Officer
In addition to the Client Advisor, the virtual Client Information Security Officer (vCISO) is focused on strengthening security governance, policies, and overall security posture to help protect the customer’s brand, operations, and critical data. In today’s threat landscape, compliance obligations and cybersecurity risks often exceed an organization’s internal capacity to address them comprehensively. The vCISO role provides strategic guidance, risk-based recommendations, and practical next steps to help the client reduce risk and improve resilience. With Synoptek’s virtual Client Information Security Officer services, you gain access to a security leader with proven experience in identifying, communicating, and mitigating risks while helping address your organization’s ongoing security concerns. The virtual Client Information Security Officer’s charter includes:
• Develop and guide the overall security and risk management strategy, including alignment with applicable industry and compliance requirements
• Provide security advisory services and recommendations to evolve the client’s security posture through a multi-year security roadmap
• Assess the current security state, including policies and procedures, prior risk assessments, penetration testing results, vulnerability scanning results, and organizational best practices • Compare the current-state assessment to the Security Health Check findings, identify gaps, and document a prioritized roadmap and scope of work for remediation vCISO hours are provided as a fixed number of hours per month based on the anticipated effort required to support the IT security program and manage business risk. Actual time requirements may vary depending on the scope of services provided. In many cases, the vCISO may recommend additional improvements, including managed services or separately scoped projects, to further strengthen the security program. The hours included in this proposal are intended to support ongoing risk management, security program oversight, and Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 6 strategic advisory services. Additional hours are available upon request for remediation planning, incident response support, or project-related efforts needed to address identified risks and root causes. 24/7 Workforce Productivity
To deliver responsive end-user support for CITY OF LOMA LINDA, Synoptek is including our ITaaS User service, which provides a fully functioning support desk with the knowledge, tools, and skill sets needed to support users in a timely and effective manner. The following services are included in this capability:
• 24x7x365 remote support help desk
• Desktop and laptop support, including full support for Microsoft applications and operating systems
• Basic support for non-Microsoft applications and operating systems • Vendor escalation and management, as needed
• Secure remote access support
• Onsite reactive support, as required
• Anti-spam, anti-virus, anti-malware, and anti-evasion protection • Workstation patch management
Applications Support & Vendor Management
Every organization operates differently, and the applications required to support users and business processes vary accordingly. Synoptek recognizes that application environments are unique and provides best-effort support for business applications and end-user requests within the scope of managed services. In some situations, vendor escalation may be necessary to resolve issues that fall outside the capabilities or scope of a Level 1 or Level 2 service engineer. To support these needs, Synoptek has outlined the services and support capabilities below to clarify how we will meet CITY OF LOMA LINDA’s requirements, including vendor escalation and management where appropriate. • First-, second-, and third-level support for Windows, Azure, Office, Office 365, Exchange, Active Directory, internet browsers, backup, replication, and network infrastructure • Support for routine service requests and configuration changes, including user setup, moves, adds, changes, and decommissions for listed applications and vendors Third Party Systems and Services (Vendor Management):
• Certain hardware, software, and other services may be provided by third parties. Synoptek will serve as a central point of contact for IT-related issues; however, some issues will require support from third-party providers. In those cases, Synoptek will provide vendor escalation and coordination services and work with the appropriate vendor to help drive resolution. This approach requires CITY OF LOMA LINDA to maintain active third-party support and maintenance agreements for critical applications. Specific partners, such as Salesforce and Rootstock, will be documented during transition.

Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 7 24x7x365 Core Infrastructure Management
In addition to monitoring and managing production infrastructure, Synoptek recognizes that the local infrastructure and network services supporting CITY OF LOMA LINDA are critical to maintaining performance, availability, and business continuity. To support this environment, Synoptek has included services to monitor, manage, and support the core infrastructure identified below. • Customer Site in the City of Loma Linda
• 24x7 infrastructure management, monitoring & support
• Server backups
• Device Networking, Systems, and Circuits
• Third party/ vendor management & escalation
Increased Managed Security
The threat landscape continues to expand across industries, and Synoptek recognizes that organizations need both protection and practical guidance to reduce cyber risk. Synoptek’s cybersecurity team continues to enhance its tools, capabilities, and client education to help protect systems, users, and business operations. While the services listed below do not represent our full security portfolio, they reflect key components of a strong security posture and a practical protection strategy.
• End-point security management of Anti-Spam, Anti-Virus, Anti-Malware, & Anti-Evasion • Firewall security management
• Server & Workstations Patch Management
• Website URL Filtering & Security
Vulnerability Management Services
As software and hardware environments continue to grow in complexity, vulnerabilities are often introduced unintentionally through upgrades, updates, and configuration changes. Synoptek’s Vulnerability Management Service is designed to identify new and existing vulnerabilities across your technology environment and help reduce exposure before those weaknesses can be exploited. This service applies a multi-layered approach: first, Synoptek uses established tools and methodologies to identify vulnerabilities within your network; second, we analyze the results and provide risk-based recommendations; and finally, we advise on remediation and perform follow-up scans, as needed, to help confirm that corrective actions have been applied and that the overall threat surface continues to decrease.

Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 8 Managed Security Operations Center (SOC) Services
Synoptek’s Managed SOC Services are designed to strengthen security monitoring, detection, and response across the client environment. When paired with SIEM, these services provide a 24x7 managed detection and response capability for security events. Our SOC services include cloud SIEM support, security event detection, alert investigation and response, daily security review, and monthly threat intelligence reporting. • 24x7x365 Detection of Security Events
• Daily Cyber Security review
• 24x7x365 Alert Investigation and Response
• Monthly threat Intelligence Reporting
If additional services are needed beyond the scope of this proposal, a full listing of Synoptek’s capabilities can be found on our website at https://synoptek.com/synoptek-service-definitions/ Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 9 ASSUMPTIONS AND TERMS & CONDITIONS
Synoptek has deep experience providing managed IT support services for organizations that seek high service levels, strong customer service, and an excellent end-user experience. We understand that pricing must remain flexible and scalable as the organization evolves. To support that objective, Synoptek proposes a pricing methodology that simplifies cost calculation and provides complete IT support for the services included in the pricing table below.

The Term of this Service Order shall be 12 months. The Term shall automatically renew in accordance with the terms set forth in the Master Services Agreement between the parties. • Monthly Recurring Charges (MRC) will be invoiced as services are made available to the Customer or as a continuation of the prior service order contract renewal. • Non-recurring charges will be invoiced upon execution of this Service Order by both parties. • In no event will the then-current Monthly Recurring Charges (MRC) be reduced by more than twenty percent (20%) during the Term of this Service Order as a result of any reduction in the scope of Services.
• Any updates to the quantities of users or devices will be reflected in the quantities invoiced to CITY OF LOMA LINDA. Service changes will be processed through the appropriate Change Order management process agreed upon between the parties.
• Synoptek may identify a critical risk or issue regarding Customer IT systems. In such cases, Synoptek may make recommendations to resolve an issue or mitigate a risk. If the Customer does not accept or acknowledge the recommendation, Synoptek may issue a Change Order to document the risk or issue and amend the service scope. Such a Change Order will not change the price without agreement but may limit Synoptek’s obligations if the risk materializes and causes impact.

General Assumptions
Synoptek’s estimated fees and service level commitments are fundamentally tied to certain estimating assumptions that can be made and the establishment and management of standard processes and procedures for managing IT operations. Extraordinary situations or changes in conditions that may require higher support levels to achieve service levels will be identified and documented. Synoptek assumes the following:
• This proposal is based on the conversations and documentation shared between the parties. • Synoptek will require administrative access permissions on all supported equipment. • Synoptek will host a knowledge base and provide a ticketing system for IT operations. • Each user support cost includes licensing for antivirus, anti-malware, anti-evasion, spam filtering, email encryption, remote monitoring, and management.
• Customer is assumed to have industry-average ticket volume, which is a key component in calculating the labor required to support the environment. If a significant change in volume is realized, the Customer and Synoptek leadership teams will agree on a mutually corrective course of action. This proposal assumes no more than one end-user-generated ticket per user per month, calculated quarterly. Synoptek expects to review ticket volume with the Customer monthly. Material changes in ticket volume will result in a joint review of the capacity plan.

Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 10 • As part of the IT Leadership and Governance effort, Synoptek has allocated a certain amount of effort each month to support quarterly business and technology reviews. These reviews are part of the ongoing management service and should include executive management to drive accountability and strategic direction.
• Synoptek’s managed security services do not include audit or control attestation. The Customer retains responsibility for its own compliance obligations and for acting on guidance provided through Synoptek Security Services and applicable third parties. • Synoptek may propose separately billable projects as identified and prioritized through the IT roadmap developed in partnership with the Customer. Projects requiring a higher level of effort or specialized skills will need to be scoped and priced separately. Examples include server replacements, migrations and/or upgrades, large-scale enterprise system development, complex systems integration, or complete rewrites or re-architecture of existing business systems or applications. Changes requiring more than two hours of labor may be considered a project. • Software licensing, circuit and telecommunications costs, hardware and software support, and other third-party costs not explicitly included in the proposed pricing are excluded, except for antivirus, URL filtering, anti-evasion, anti-malware software, and security testing and training, which will be included if Synoptek’s recommended vendor solutions are implemented. • Synoptek assumes that the Customer has the necessary third-party support contracts in place for all critical hardware, software, and services. The Customer will maintain all current third-party support contracts for hardware and application support unless mutually agreed otherwise.

Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 11 PRICING
Monthly Recurring Billing
Service Name Service Description Price
Per Unit
Quantity Total
Amount
IT Security and IT Management
SEC-VCISO-VCISO (BISG) Virtual Chief Information Security Officer provides advisory services includes developing
and managing a security plan, creation and/or
development of policy to enhance customer's
security posture.
$225.00 36 $8,100.00
ITL-ITA-IT Advisory IT Advisory services includes developing and managing a plan to enhance customer's IT
systems and advance them along the
capability maturity model.
$175.00 8 $1,400.00
Network Management
IFS-SNTMGT-ITaaS Site Monitoring, remediation and reporting for up to 4 network devices (router, switch, firewall,
WAP, circuit) located in a single client site.

Include Synoptek Edge appliance. Additional
devices may increase pricing
$219.85 1 $219.85
IFS-SNTMGT-ITaaS Site Add-On -
Additional Device
Monitoring, management, and remediation
services for additional network devices and
circuits beyond what's included with ITaaS -
Site.
$31.30 10 $313.00
IFS-SNTMGT-ITaaS Site Add-On -
Additional Device
Monitoring, management, and remediation
services for additional network devices and
circuits beyond what's included with ITaaS -
Site. - Wireless Access Points
$15.65 13 $203.45
Server and Storage Management
IFS-SVRMGT-ITaaS Server - STANDARD Management of a physical or virtual server.

Includes monitoring, anti-virus, patch
management, management of existing backup
solutions, and OS troubleshooting. Hardware,
alternative or additional backup solution,
internet bandwidth, licensing, and application
management not included.
$45.07 13 $585.91
End-User and Helpdesk
BUNDLE-ITaaS User - MAX Monitoring, management, securing and patching (critical OS only) of laptop/mobile
devices. 24x7 Help Desk support per user. -
MAX
$48.10 65 $3,126.50
Security Services
Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 12 Service Name Service Description Price
Per Unit
Quantity Total
Amount
SEC-INPROT-SOCaaS-DailyReview SSOCaaS-ODO provides a Once Daily Overview of the client environment outside of
the known threats identified to determine if
further action is needed. This is a required SKU
for the SSOCaaS product.
$400.00 1 $400.00
SEC-INPROT-SOCaaS-Endpoint SSOCaaS-Endpoint provides immediate Security Analyst review of security events.

Escalations are created based on the priority of
the SOC Analyst investigation. This SKU is for
the inclusion of endpoints to the service.
$14.75 65 $958.75
SEC-INPROT-SOCaaS-User SSOCaaS-Users provides immediate Security Analyst review of security events. Escalations
are created based on the priority of the SOC
Analyst investigation. This SKU is for the
inclusion of users to the service. This is a
required SKU for the SSOCaaS service.
$15.60 65 $1,014.00
SEC-INPROT-SOCaaS-Firewall SSOCaaS-Firewall provides immediate Security Analyst review of security events.

Escalations are created based on the priority of
the SOC Analyst investigation. This SKU is for
the inclusion of firewalls to the service.
$22.60 2 $45.20
SEC-IFPROT-Vulnerability
Management Add Single IP
Provides vulnerability scanning and analysis
for individual IP addresses. Minimum 25 IPs
$6.75 25 $168.75
SEC-IFPROT-SIEM Threat Intelligence
Reporting
Monthly report highlighting incidents and
resolutions. SIEM Basic or Compliance
required.
$350.00 1 $350.00
SEC-INPROT-SOCaaS-Server SSOCaaS-Server provides immediate Security Analyst review of security events. Escalations
are created based on the priority of the SOC
Analyst investigation. This SKU is for the
inclusion of servers to the service.
$22.60 9 $203.40
WFP-O365-Managed Application –
Office365
Includes basic user and configuration
management of Outlook, One-Drive and
SharePoint Online. Licensing, backups, and
internet bandwidth are not included. Requires
full end-user service desk.
$200.00 1 $200.00
Total $17,288.81
Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 13 APPROVAL
This Managed Services Order is issued under the agreed terms and conditions of the Master Service Agreement on file. If these services are subject to taxation, the Client agrees that it will pay any such taxes invoiced by Synoptek. Both parties represent and warrant that they have full corporate power and authority to execute and deliver this Service Order and to perform their obligation hereunder, and that the person whose signature appears below is duly authorized to enter into this Service Order on behalf of the party and subject to all terms and conditions stated herein.

IN WITNESS WHEREOF, the parties have agreed to the terms and conditions of this Service Order as of the date of the last signature.

Approved By: CITY OF LOMA LINDA
Signature:

Accepted for: Synoptek, LLC
Signature:

Printed Name: Printed Name:

Title: Title:

Date: Date:

Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 14 SECTION F: APPENDIX
Changes are highlighted in green
Changes:
#1 vCISO hours increased to 36 hours per month
#4 & #5 ItaaS Site Additional Devices split between non-WAP and WAP devices and count adjusted #6 Server count adjusted and also adjusted for change order #18139. Added NetAPP (192.168.6.35) in this renewal which was added to monitoring
#7 User count adjusted per user list provided by City of Loma Linda #9 Adjusted pricing
#10 Adjusted user count
#11 Adjusted count that includes adjustments for change order #18139 #13 Adjusted for user count
#15 Removed. This will be handled by City of Loma Linda Staff.

Current Invoice (May 2026)
# Item Description Quantity Rate/Cost Billable Amount Quantity Rate/Cost Billable Amount Change Comments IT Security and IT Management
1 SEC-VCISO-VCISO (BISG) 8 $225.00 $1,800.00 36 $225.00 $8,100.00 $6,300.00 Increase hours vor vCIXO 2 ITL-ITA-IT Advisory 8 $175.00 $1,400.00 8 $175.00 $1,400.00 $0.00 Network Managem ent
3 IFS-SNTMGT-ITaaS Site 1 $219.85 $219.85 1 $219.85 $219.85 $0.00 4 IFS-SNTMGT-ITaaS Site Add-On - Additional Device 28 $31.30 $876.40 10 $31.30 $313.00 -$563.40 Split network in wifi & non-wifi 5 IFS-SNTMGT-ITaaS Site Add-On - Additional Device (AP) N/A $0.00 13 $15.65 $203.45 $203.45 NEW Server and Storage Management
6 IFS-SVRMGT-ITaaS Server - STANDARD 16 $45.07 $721.12 13 $45.07 $585.91 -$135.21 VM, Hosts, SAN * End-user and Helpdesk
7 BUNDLE-ITaaS User - MAX 93 $48.10 $4,473.30 65 $48.10 $3,126.50 -$1,346.80 Reduced user count Security Services
8 SEC-INPROT-SOCaaS-DailyReview 1 $500.00 $500.00 1 $400.00 $400.00 -$100.00 9 SEC-INPROT-SOCaaS-Firewall 2 $32.97 $65.94 2 $22.60 $45.20 -$20.74 Reduced rate 10 SEC-INPROT-SOCaaS-User 93 $15.60 $1,450.80 65 $15.60 $1,014.00 -$436.80 Reduced user count 11 SEC-INPROT-SOCaaS-Server 13 $32.97 $428.61 9 $22.60 $203.40 -$225.21 Exludes Host and SAN 12 SEC-IFPROT-SIEM Threat Intelligence Reporting 1 $350.00 $350.00 1 $350.00 $350.00 $0.00 13 SEC-INPROT-SOCaaS-Endpoint 91 $17.33 $1,577.03 65 $14.75 $958.75 -$618.28 Reduced user count 14 SEC-IFPROT-Vulnerability Management Add Single IP 25 $6.75 $168.75 25 $6.75 $168.75 $0.00 Application Management
15 WFP-AD-Active Directory Management 1 $99.00 $99.00 0 $99.00 $0.00 -$99.00 Removed. Handled in-house 16 WFP-O365-Managed Application – Office365 1 $200.00 $200.00 1 $200.00 $200.00 $0.00 Total $14,330.80 $17,288.81 $2,958.01
Adjustment
Legal Notice: The information transmitted in this document is intended only for the addressee and may contain confidential and/or privileged material. Any interception, review, retransmission, dissemination, or other use of, or taking of any action upon this information by persons or entities other than the intended recipient is prohibited by law and may subject them to criminal or civil liability. 15 City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
H. Consider Approving Extension of the Annual Service Contracts for Fiscal Year 2026-27 (Fire Department) [CC] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3H.

From
Nataly Alvizar, Executive Aide
Via
Dan Harker, Fire Chief
RECOMMENDATION:

It is recommended that the City Council approve one-year contract extensions for the period of July 1, 2026, through June 30, 2027, subject to any revisions to the agreement deemed necessary by the City Attorney, for the following service providers:

1. City of San Bernardino – Hearing Review Services

2. Comcate Software, Inc. – Code Enforcement Database Services

3. Dennis Grubb & Associates, a Willdan Engineering Company – Code Enforcement and Animal Control Services

4. ESRI, Inc. – ArcGIS Online Viewer Annual Subscription

5. HRE, LLC – Performance Management Software

6. Lexipol, LLC – Standard Operating Procedures Software

7. Phoenix Group Information Systems – Administrative Citation Collection, Parking Permit Management, and Parking Recovery Services

8. Phong Nguyen, M.D. – Emergency Medical Services Medical Director

9. Roadpost USA, Inc. – Satellite Communications Services

10. US Tronics – Satellite Phone Services

11. Wittman Enterprises, LLC – Emergency Medical Services Billing Services

12. CONFIRE JPA – Dispatch Services

13. County of San Bernardino – IDT Radio Services Contract

14. The Counseling Group – Employee Assistance Program Services

15. James D. Huss – Weed Abatement Services

16. Fire App (OCV, LLC.) – Fire Department Mobile Application

17. Orion Software (Futurity IT) – Damage Assessment Platform for Emergency Management

18. First Due (Locality Media, Inc.) – Fire Prevention Software Services BACKGROUND:

The above service contracts provide essential operational, regulatory, communication, emergency medical, fire prevention, and facility maintenance services necessary for the continued operation of the Fire Department and related City programs. The has maintained long-standing professional relationships with these vendors and service providers and has been satisfied with the services received.

Continued use of these contractors will ensure uninterrupted service delivery and operational efficiency throughout Fiscal Year 2026-27.

ANALYSIS:

Staff recommends renewing the listed contracts for Fiscal Year 2026-27. These contracts provide services that support Fire Department operations, code enforcement activities, emergency communications, emergency medical services, fire prevention programs, and facility maintenance functions.

Any proposed fee adjustments have been reviewed by staff and are consistent with the terms of the respective agreements, including applicable Consumer Price Index (CPI) adjustments where authorized. Staff has determined that the proposed contract renewals and associated fee adjustments are reasonable, necessary, and in the best interest of the City.

FINANCIAL IMPACT:

Funding for these contract services has been included in the Fiscal Year 2026-27 Operating Budget and is available within the accounts identified below.

City of San Bernardino – Hearing Review Services
• $500 – Account No. 0012060-51820
Comcate Software, Inc.
• $10,900 – Account No. 0012050-51830 (Database Services and Upgrade Fee) • $15,600 – Account No. 0012050-51830 (Code Enforcement GIS Enterprise, CRM311, and Comcate Connect) Dennis Grub & Associates, a Willdan Engineering Company • $95,00 – Account No. 0012050-51830 (Code Enforcement) • $85,000 – Account No. 0012150-51830 (Animal Control)
ESRI, Inc.
• $2,400 – Account No. 0012110-51830

HRE, LLC
• $2,700 – Account No. 0012110-51310
Lexipol, LLC
• $2,800 – Account No. 0012110-51830
Phoenix Group Information Systems
Parking Permit Management Program
• $1,000 – Account No. 0012060-51830
• $4,000 – Account No. 0012060-51830
• $8,600 – Account No. 0012060-51830
Delinquent Parking Recovery Program
• $12,000 – Account No. 0012060-51830
Administrative Citation Program
• $700 – Account No. 0012050-51830
• $700 – Account No. 0012150-51830
Phong Nguyen, M.D. – Medical Director Services
• $13,000 – Account No. 0012110-51820
Roadpost USA, Inc.
• $8,800 – Account No. 0012130-51120
US Tronics
• $2,700 – Account No. 0012130-51110
Wittman Enterprises, LLC
• $15,000 – Account No. 0012110-51830
CONFIRE JPA – Dispatch Services
• $384,300 – Account Nos. 0012110-51830, 4053500, and 4657000 County of San Bernardino- IDT Radio Contract
• $45,000 – Account No. 0012110-51830
The Counseling Group
• $10,100 – Account No. 0012110-51830
West SWPPP
• $25,000 – Account No. 0012070-51820
Fire App (OCV, LLC)
• $5,900 – Account No. 0012110-51820
• $5,900 – Account No. 0012130-51820
Orion Software (Futurity IT)
• $5,900 – Account No. 0012130-51550
First Due ( Locality Media, Inc)
• $4,400 – Account No. 0012070-51550550
City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
H. Consider Approving Extension of the Annual Service Contracts for Fiscal Year 2026-27 (Public Works Department) [CC]
Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3H.

To
City Council
From
Julia Loeffert, Executive Assistant
Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

It is recommended that the City Council approve one-year contract extensions for the period of July 1, 2026, through June 30, 2027, subject to any revisions to the agreement deemed necessary by the City Attorney, for the following service providers:

1. Adopt-A-Highway – Maintenance of hardscape at the On- and Off-ramps at 1-10 Fwy at Mt. View Ave.

2. APL Professional Landscapes - Landscape Maintenance Services

3. Ascent Aviation Group (World Fuel) - Fuel tank monitoring system

4. Facilities Protection Systems, Inc. – Fire Protection System Monitoring and Preventative Maintenance for all city buildings

5. Loma Linda Heat & Air – HVAC Maintenance Service for all city office buildings

6. Lynn Merrill & Associates - Professional services associated with National Pollutant Discharge Elimination System (NPDES) & State mandated recycling inspections and reporting

7. Willdan Financial Services – District Administrative Services for the Landscape Maintenance Districts (LMD) and Street Light Districts (SLD) assessment areas
BACKGROUND:

All the service contracts renewals are for maintenance of city buildings, public facilities and infrastructure. The City of Loma Linda has maintained a professional working relationship with each contractor and have been very satisfied with services provided. They have provided commendable service.

ANALYSIS:

The City of Loma Linda recommends renewing all contracts for one year for Fiscal Year 2026-27, as specified.

Requests for service rate increases have been according to the appropriate CPI adjustments per the service agreements and are acceptable to the City.

ENVIRONMENTAL IMPACT:

N/A
FINANCIAL IMPACT:

Funding for these services is as follows:

1. Adopt-a-Highway:
a. $15,900 - 0013200-51830 (Cleaning and weeding hardscape at I-10 Fwy Mt. View Ave. ramps)

2. APL Professional Landscapes:
a. $292,600 - 1715200-51830 (Landscape Maintenance Services)

3. Ascent Aviation Group (World Fuel) - Fuel tank monitoring system a. $2,300 - 0013200, 0013400, 0014200, 4053500 and 4657000-51830

4. Facilities Protection Systems:
a. $37,300 – 0012110-51310, 0013200, 0013400, 0014200, 0014400, 0015500, 4053500, 4405900, 4657000, 4657010, 4657020, 4657030, and 4405900, -51830.

5. Loma Linda Heat & Air:
a. $15,000: 0012110, 0013030, 0013200, 0013400, 0014200, 0014400, 0015500, 4053500, 4657010, 4405900 -51830 (City buildings)

6. Lynn Merrill & Associates:
a. $30,000 - 0013610-51820 and 4053500-51820

7. Willdan Financial Services:
a. $9,300 - 1715200-51820 (District Administrative services for the LMD areas.) b. $7,900 - 1725100-51820 (District Administrative services for the SLD areas.) City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
J. Consider Approving the Notice of Completion for the installation of the 1.6 Million Gallon Reservoir for $6,047,686.75 - Contractor: Borden Excavating (CIP 20-656) (Public Works) [CC] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3J.

To
City Council
From
Julia Loeffert, Executive Assistant
Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

It is recommended that the City Council accept the 1.6 Million Gallon Reservoir as substantially complete and authorize the City Clerk to file the Notice of Completion.

BACKGROUND:

On March 14, 2023, the City Council awarded the construction contract to Borden Excavating, Inc., of Calimesa, California, in the amount of $5,671,477.00, with an approved construction contingency of $567,000.00.

The contractor successfully completed the project in a professional manner and in accordance with the approved scope of work. During construction, unforeseen field conditions required additional work beyond the original contract amount. In addition, extended lead times associated with the Supervisory Control and Data Acquisition (SCADA) system and electrical components impacted the project schedule. Although these unforeseen conditions resulted in costs exceeding the original contract amount, the additional work was accommodated within the Council-approved contingency, resulting in a final construction cost of $5,745,302.41.

The attached Notice of Completion has been prepared for City Council review and approval. Upon authorization, the City Clerk will proceed with its recordation. The contractor's one-year warranty period will commence on the date of recordation.

ANALYSIS:

N/A
ENVIRONMENTAL IMPACT:

N/A
FINANCIAL IMPACT:

The project was anticipated to be completed during Fiscal Year 2024-25 and, therefore, was not budgeted in Fiscal Year 2025-26. On August 12, 2025, the City Council approved a Supplemental Appropriation in the amount of $802,200, into the Water Acquisition Account No. 4387200-58500, to provide funding necessary for the completion of the project.

Attachments
NOC 1.6 MG Reservoir CIP 20-656.pdf

LYNETTE ARREOLA
RECORDING REQUESTED BY:

AND
WHEN RECORDED MAIL TO:

LYNETTE ARREOLA

CITY CLERK

CITY OF LOMA LINDA
25541 BARTON ROAD
LOMA LINDA CA 92354
APN#’s 029-305-221, 0293-052-18 & SPACE ABOVE THIS LINE FOR RECORDER’S USE 029-305-217 EXEMPT FROM FILING FEES, GOVERNMENT CODE SECTION 6103

NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN THAT:

1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described:

2. The FULL NAME of the OWNER is City of Loma Linda

3. The FULL ADDRESS of the OWNER is 25541 Barton Road, Loma Linda, CA 92354

4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee. (If other than fee, strike “in fee” and insert, for example “purchaser under contract of purchase” or “lessee.”)

5. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are:

Names Addresses

6. The full names and full addresses of the predecessors in interest of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to:

Names Addresses

7. A work of improvement on the property hereinafter described was COMPLETED May 12, 2026

8. The work of improvement completed is described as follows: CONSTRUCTION OF A NEW 1.6 MG RESERVOIR, ACCESS ROAD, AND TRANSMISSION LINE (CIP 20-656)

9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is BORDEN EXCAVATING, INC., 1014 2ND STREET CALIMESA, CA 92320

10. The street address of said property is APNs: 029-305-221, 029-305-218 & 029-305-217

11. The property on which said work of improvement was completed is in the City of Loma Linda County of San Bernardino , State of California, and is described as follows:

CONSTRUCTION OF A NEW 1.6 MG RESERVOIR, ACCESS ROAD, AND TRANSMISSION LINE (CIP 20-656)
Signature of Owner or Agent Owner Date:

Lynette Arreola, City Clerk
Verification of INDIVIDUAL owner : I, the
undersigned, declare under penalty of perjury under the laws of the State of California that I am the owner of the aforesaid interest or estate in the property described in the above notice; that I have read said notice, that I know and understand the contends thereof, and that the facts stated therein are true and correct.

Date and Place (Signature of owner named in paragraph 2) Verification for NON-INDIVIDUAL owner: I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the City Clerk of the aforesaid interest or “PRESIDENT, PARTNER, MANAGER, AGENT, ETC.”
in the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct.

Date and Place (Signature of person signing on behalf of owner) Lynette Arreola, City Clerk
I:\Public Works Admin\Staff Reports\Notice of Completion\1.6 MG Reservoir CIP 20-656.doc City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
K. Consider Approving the Notice of Completion of the Storm Drain Improvements on Citrus Avenue for $276,494.46 - Contractor: Voltaire Engineering Inc. (CIP 25-414) (Public Works) [CC] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3K.

To
City Council
From
Julia Loeffert, Executive Assistant
Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

It is recommended that the City Council accept the Storm Drain Installation at Citrus Street from California Street to Avalon Way (CIP 25-414) as substantially complete and authorize the City Clerk to file the Notice of Completion.

BACKGROUND:

On March 10, 2025, the City Council awarded a construction contract to Voltaire Engineering, Inc., of Redlands, CA, in the amount of $231,588.00, with an approved contingency of $23,000. The final project cost is $276,494.46, exceeding the original contract and contingency amount by $21,906.46. The overage is primarily attributed to unforeseen field conditions encountered during construction.

Attached is the Notice of Completion for the project. Upon City Council authorization, the City Clerk will record the Notice of Completion. The contractor’s one-year warranty period will begin on the date the Notice is recorded.

ANALYSIS:

N/A
ENVIRONMENTAL IMPACT:

N/A
FINANCIAL IMPACT:

The final project cost exceeded the approved contract amount, including contingency, by $21,906.46. However, a supplemental appropriation is not required. The project was originally budgeted in account 3095350-58500, based on the Engineer's Estimate, and the bid received was substantially lower than that estimate. As a result, sufficient funds remain within the existing project appropriation to cover the additional costs.

Attachments
NOC Storm drain installation at Citrus St from California St to Avalon Way CIP 25-414.pdf

LYNETTE ARREOLA
RECORDING REQUESTED BY:

AND
WHEN RECORDED MAIL TO:

LYNETTE ARREOLA

CITY CLERK

CITY OF LOMA LINDA
25541 BARTON ROAD
LOMA LINDA CA 92354
APN# - N/A SPACE ABOVE THIS LINE FOR RECORDER’S USE
EXEMPT FROM FILING FEES, GOVERNMENT CODE SECTION 6103

NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN THAT:

1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described:

2. The FULL NAME of the OWNER is City of Loma Linda

3. The FULL ADDRESS of the OWNER is 25541 Barton Road, Loma Linda, CA 92354

4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee. (If other than fee, strike “in fee” and insert, for example “purchaser under contract of purchase” or “lessee.”)

5. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are:

Names Addresses

6. The full names and full addresses of the predecessors in interest of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to:

Names Addresses

7. A work of improvement on the property hereinafter described was COMPLETED May 6, 2026

8. The work of improvement completed is described as follows: Installation of Storm Drain at Citrus Street from California St to Avalon Way

9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is Voltaire Engineering, Inc., 1460 Cambridge Ave., Redlands, CA 92374

10. The street address of said property is Citrus Street from California Street to Avalon Way

11. The property on which said work of improvement was completed is in the City of Loma Linda County of San Bernardino , State of California, and is described as follows:

Installation of Storm Drain at Citrus Street from California St to Avalon Way Signature of Owner or Agent Owner Date:

Lynette Arreola, City Clerk
Verification of INDIVIDUAL owner : I, the
undersigned, declare under penalty of perjury under the laws of the State of California that I am the owner of the aforesaid interest or estate in the property described in the above notice; that I have read said notice, that I know and understand the contends thereof, and that the facts stated therein are true and correct.

Date and Place (Signature of owner named in paragraph 2) Verification for NON-INDIVIDUAL owner: I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the City Clerk of the aforesaid interest or “PRESIDENT, PARTNER, MANAGER, AGENT, ETC.” in the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct.

Date and Place (Signature of person signing on behalf of owner) I:\Public Works Admin\Staff Reports\Notice of Completion\NOC Storm drain installation at Citrus St from California St to Avalon Way CIP 25- 414.doc
City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
L. Consider Approving the Notice of Completion for the Replacement of the Community Room HVAC Unit for $52,386.98 - Contractor: Loma Linda Heating & Air Conditioning, Inc. (Public Works) [CC] Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Consent Calendar Item: 3L.

To
City Council
From
Julia Loeffert, Executive Assistant
Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

It is recommended that the City Council accept the replacement of the Community Room Heating, Ventilation, and Air Conditioning (HVAC) unit as complete and authorize the filing of the Notice of Completion.

BACKGROUND:

The HVAC unit serving the City Community Room had reached the end of its serviceable life and was experiencing ongoing operational issues. The unit was original to the building and had significantly exceeded its expected useful life, making replacement the most practical and cost-effective solution to ensure the continued operation and availability of the facility for public use.

On March 10, 2026, the City Council approved a supplemental appropriation of $95,000 into Account No. 0013400- 51310 to address various Civic Center maintenance needs. Subsequently, a budget transfer was completed to move the cost associated with the HVAC replacement into Account No. 0013400-58220, Facilities – Capital Outlay, to properly reflect the nature of the expenditure.

The HVAC replacement has been completed in a satisfactory and professional manner at a total cost of $52,386.98.

The attached Notice of Completion has been prepared for City Council review. Upon authorization, the City Clerk will proceed with recordation. The contractor's one-year warranty period will commence on the date of recordation.

ANALYSIS:

N/A
ENVIRONMENTAL IMPACT:

N/A
FINANCIAL IMPACT:

The total project cost was $52,386.98 and is funded through Account No. 0013400-58220, Facilities – Capital Outlay. Funding was made available through the supplemental appropriation approved by the City Council on March 10, 2026, and the subsequent budget transfer. No additional appropriation is required.

Attachments
NOC Community Room HVAC.pdf

LYNETTE ARREOLA
RECORDING REQUESTED BY:

AND
WHEN RECORDED MAIL TO:

LYNETTE ARREOLA

CITY CLERK

CITY OF LOMA LINDA
25541 BARTON ROAD
LOMA LINDA CA 92354
APN#’s 0284-201-16 SPACE ABOVE THIS LINE FOR RECORDER’S USE EXEMPT FROM FILING FEES, GOVERNMENT CODE SECTION 6103

NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN THAT:

1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described:

2. The FULL NAME of the OWNER is City of Loma Linda

3. The FULL ADDRESS of the OWNER is 25541 Barton Road, Loma Linda, CA 92354

4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee. (If other than fee, strike “in fee” and insert, for example “purchaser under contract of purchase” or “lessee.”)

5. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are:

Names Addresses

6. The full names and full addresses of the predecessors in interest of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to:

Names Addresses

7. A work of improvement on the property hereinafter described was COMPLETED May 15, 2026

8. The work of improvement completed is described as follows: Replacement of the Community Room HVAC unit

9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is Loma Linda Heating & Air Conditioning, Inc., P.O. Box 11609, San Bernardino, CA 92423-1609

10. The street address of said property is 25541 Barton Road, Loma Linda, CA 92354

11. The property on which said work of improvement was completed is in the City of Loma Linda County of San Bernardino , State of California, and is described as follows:

Replacement of the Community Room HVAC unit
Signature of Owner or Agent Owner Date:

Lynette Arreola, City Clerk
Verification of INDIVIDUAL owner : I, the
undersigned, declare under penalty of perjury under the laws of the State of California that I am the owner of the aforesaid interest or estate in the property described in the above notice; that I have read said notice, that I know and understand the contends thereof, and that the facts stated therein are true and correct.

Date and Place (Signature of owner named in paragraph 2) Verification for NON-INDIVIDUAL owner: I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the City Clerk of the aforesaid interest or “PRESIDENT, PARTNER, MANAGER, AGENT, ETC.”
in the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct.

Date and Place (Signature of person signing on behalf of owner) Lynette Arreola, City Clerk
I:\Public Works Admin\Staff Reports\Notice of Completion\Community Room HVAC.doc City of Loma Linda
Regular City Council, Housing Authority, and Successor
Agency Joint Meeting Staff Report
A. Council Bill #O-2026-06 - Consider Adopting an Ordinance Proposing a Five-Year Rate Increase to the Wastewater (Sewer) Utility Services Effective July 9, 2026, to June 30, 2031, and Repealing Ordinance No. 769 (Administration) [CC]
Meeting
Tuesday, June 9, 2026, 7:00 PM
Agenda Group
Old Business Item: 4A.

To
City Council
From
John Trujillo, Deputy Director Public Works
Via
T Jarb Thaipejr, City Manager
RECOMMENDATION:

It is recommended that the City Council adopt Council Bill #0-2026-06, waive the reading of the ordinance in its entirety, direct the City Clerk to read by title only, and approve the wastewater collection rate increase effective July 9, 2026. Ordinance Title:

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMA LINDA, CALIFORNIA, ESTABLISHING WASTEWATER COLLECTION RATES EFFECTIVE JULY 9, 2026, AND REPEALING ORDINANCE NO. 769 BACKGROUND:

On May 26, 2026, the City Council introduced Council Bill #O-2026-06 on first reading and set the second reading to June 9, 2026, for adoption. The proposed rate increase is based on a rate study prepared by the City of San Bernardino to cover the costs projected for the next five years. It is a pass through fee for wastewater treatment paid to City of San Bernardino. The City of Loma Linda's portion for collection is not being changed at this time, and Loma Linda will not receive any revenue from this action.

California's Proposition 218 mandates that local agencies mail written notices to property owners at least 45 days before a public hearing regarding new or increased property-related fees or assessments. 5,072 notices were mailed to residents and owners on April 7, 2026, with zero (0) returned as undeliverable. The City received twenty (20) written protests from city properties. Following the May 26, 2026, public hearing, the City received four (4) additional written protests on May 27, 2026.

ANALYSIS:

There have been no new developments. The staff report remains unchanged, and City Staff has no new updates to present to City Council. Staff continues to recommend adoption of the Ordinance.

ENVIRONMENTAL IMPACT:

N/A
FINANCIAL IMPACT:

This is a pass-through fee paid to the City of San Bernardino. The City of Loma Linda does not receive any fee increase.

Attachments
Notice Wastewater Pass Thru Rate Increase 2026.pdf
Council Bill O-2026-06 -Ord - Wastewater Rates Ordinance.pdf City of Loma Linda
25541 Barton Road, Loma Linda. California 92354-3160 • (909) 799-2800 • FAX (909) 790-2890 Sister Cities Manipur Karnataka, India - Libertadore, San Martin, Argentina • www lomalinda-ca.gov

NOTICE OF PUBLIC HEARING
This is a notice explaining proposed increases in the City of Loma Linda wastewater (sewer) utility service rates and charges. These proposed increases will be recommended for adoption by the City Council at the public hearing described in this notice.

The basis upon which the proposed rate increases are calculated is as follows: The City of Loma Linda provides wastewater collection services to the residents and businesses of the City. The wastewater bill is composed of treatment, provided by the City of San Bernardino, and collection, provided by the City of Loma Linda. Only the treatment portion (City of San Bernardino) of the monthly rate (currently $29.39/month for single family residential) is proposed to be increased on July 9, 2026, by 5.68% ($1.67); then on July 1, 2027, an increase by 7.02%, ($2.18); on July 1, 2028, by 6.98%, ($2.32); on July 1, 2029, by 6.02%, ($2.14); and on July 1, 2030, by 4.99%, ($1.88). This is a pass-through fee to the City of San Bernardino; the City of Loma Linda does not receive any fee increase.

Section 6 of the California Constitution, Article XIIID (Prop. 218), requires a notification be sent to the record owner of each identified parcel upon which any new wastewater rates or charges that are being proposed for adoption 45 days in advance of the public hearing.

PLEASE TAKE NOTICE that the City Council of the City of Loma Linda will hold a PUBLIC HEARING in the City Council Chamber, 25541 Barton Road, Loma Linda, California, on Tuesday, the 26th day of May, 2026, at 7:00 p.m., or as soon thereafter as possible, at which time oral and written presentations will be received pertaining to increasing wastewater rates and charges. See rate chart included with this Notice for charges.

To Protest the Proposed Rate Increases, You Must Submit a Written Protest.

If you oppose any of the proposed rate increases, your protest must be submitted in writing to be considered, even if you plan to attend the public hearing. Your written protest must be received by the City Clerk of the City of Loma Linda by 5:00pm on May 26, 2026, prior to the public hearing.

Protests must contain the following information:
1) A description of the property, such as the assessor’s parcel number; 2) Your City of Loma Linda municipal services account number; 3) Whether you are the property owner of record or a tenant (Please note that if you were not the owner of the property as of San Bernardino County’s last tax roll, please include written confirmation that you presently own the property).

The Loma Linda City Council will consider all protests against the proposed rate increases. If written protests against the proposed increases are presented by the majority of property owners, the City Council will not impose the increases.

If there is no majority protest and should the City Council adopt the proposed rates, increases in the wastewater rates shall become effective as of July 9, 2026.

You may send your written protest to: City Clerk, City of Loma Linda 25541 Barton Road
Loma Linda, CA 92354
Dated: April 10, 2026
I:\Public Works Admin\Sewer\Sewer Pass Thru Rate Increase 2026 Notice Letter.doc City of San Bernardino Pass Through - Loma Linda
Proposed Wastewater Monthly Service Charges
I Class Current July 9,2026 Julyl, 2027 Julyl,2028 Julyl,2029 July 1, 2030 Residential $29.39 $31.06 $33.24 $35.56 $37.70 $39.58
Multi-Family (2 units) $58.79 $62.13 $66.47 $71.13 $75.39 $79.16 Multi-Family (3 units) $88.18 $93.19 $99.71 $106.69 $113.09 $118.75 Low, Medium and High Strength
Laundromats, Schools, Churches, Nursery Schools
Multi-Family, Mobile Home Parks (4+ �nits)
Hospitals, Convalescent Homes
Retail, Commercial, Light Industrial $8.39 $8.53 $9.13 $9.77 $10.35 $10.87 Auto Repair, Car Wash
Office, Motels (No Restaurant)
Restaurants, Hotels
Proposed Wastewater Commodity Rates
Class Billing Unit Current July9, 2 026 July 1, 2027 July 1, 2028 July 1, 2029 July 1, 2030 Residential $/HCF N/A N/A N/A N/A N/A N/A
Multi-Family (2 units) $/HCF N/A N/A N/A N/A N/A N/A
Multi-Family (3 units) $/HCF N/A N/A N/A N/A N/A N/A
Low Strength
Laundromats, Schools, Churches, Nursery Schools $/HCF $2.18 $1.66 $1.78 $1.90 $2.01 $2.12 Medium Strength
Multi-Family, Mobile Home Parks (4+ units)
Hospitals, Convalescent Homes
Retail, Commercial, Light Industrial $/HCF $2.61 $3.09 $3.31 $3.54 $3.75 $3.94 Auto Repair, Car Wash
Office, Motels (No Restaurant)
High Strength
Restaurants, Hotels $/HCF $6.53 $8.38 $8.97 $9.59 $10.17 $10.68 Council Bill #O-2026-06
ORDINANCE NO.

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMA LINDA,

CALIFORNIA, ESTABLISHING WASTEWATER COLLECTION RATES
EFFECTIVE JULY 9, 2026, AND REPEALING ORDINANCE NO. 769 WHEREAS, pursuant to Article XIIIB of the California Constitution, it is the intent of the City Council to require the ascertainment and recovery of costs reasonably borne from fees and charges levied therefor in providing the regulation, products or services hereinafter enumerated in this resolution; and WHEREAS, there exists between the City of San Bernardino and the City of Loma Linda a Joint Powers Agreement pertaining to wastewater collection and treatment; and WHEREAS, a study was conducted by the City of Loma Linda to determine the costs to provide wastewater collection, permitting, and inspection services; and WHEREAS, the City of San Bernardino rate component for the treatment of wastewater from the City of Loma Linda to the treatment plant is independent of the City of Loma Linda approved components; and
WHEREAS, Article XIIID, Section 6(a) of the State Constitution (Proposition 218), passed by the voters of California on November 5, 1996, requires municipalities to give written notice to the owners of parcels upon which proposed water-, refuse- and/or sewer-related fees or charges are to be applied; and WHEREAS, Proposition 218 requires that a public hearing shall be conducted not less than 45 days after the mailing of a notice of a public hearing on property-related fee adjustments to the record owners of each identified parcel upon which the fee is proposed for imposition; and WHEREAS, Proposition 218 provides that, if written protests against proposed property-related fees are presented by a majority of the property owners of record upon which the proposed fees would be imposed, the fee adjustment shall not be implemented; and WHEREAS, the City has considered all comments and correspondence, and the findings and conclusions made by the City pursuant to this Ordinance are based upon all of the oral and written evidence presented to it and taken as a whole.

NOW, THEREFORE, the City Council of the City of Loma Linda does ordain as follows:

SECTION 1. FINDINGS.

The City Council finds:
a. Notice of the proposed amended wastewater collection rates and of the public hearing thereon was given pursuant to Proposition 218 to record owners of all affected parcels on April 7, 2026. 5072 notices were sent to residents and owners with 0 returned as undeliverable. b. The public hearing required by Proposition 218 was duly held by the City Council, pursuant to notice, on May 26, 2026.

Ordinance No.