1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Carla Dillon, P.E., Public Works Director
MEETING DATE: April 18, 2023
SUBJECT: Professional Services Agreement with Tetra Tech, Inc. for Roof Design for Appian Way Pump Station

RECOMMENDATION
1) Approve a Professional Services Agreement with Tetra Tech for Engineering Design Services of New Roof Design for Appian Way Pump Station in the amount of $ 86,395.00 plus a 20% contingency amount of $ 17,279.00; 2) Appropriate $63,674 to the Water Capital Fund for this project; and 3) Authorize the City Manager and City Clerk to execute the Agreement.

BACKGROUND
This Appian Way Pump Station is more than 30 years old and has an original roof with one exhaust fan and four skylights. The vertical sides of the skylights show termite infiltration.

Since this facility controls pressure and water supply to a critical tank, access must be available around the clock. The roof needs repair, replacement, and/or termite treatment.

It is not possible to tent this building for fumigation as drinking water pumps are in this building. Since the building structure is wood and old, typical surface treatment will not remove termites completely. The recommended corrective action is to remove the roof including the wood support structure and design a new support and roof using material resistant to termite infestation.

The engineering consultant will design a new roof with trusses to cover this building using material resistant to termite infestation, and the design will include four skylights and an exhaust fan in the same location as on the existing roof. The skylights need to remain in the existing locations as they are used for crane access through the roof in case the equipment needs maintenance, repair, or replacement.

The purpose of this Professional Service Agreement (PSA) with Tetra Tech is to fully assess the condition of the roof and roof structural elements and design new roof Item No. 7k

CITY OF LOMITA

CITY COUNCIL REPORT
2 structure, roof skin and roof top resistant to termites. Additionally, the consultant will produce Construction Plans and Drawings, Project Specifications and Estimate (PS&E), professional support during the bidding process, and support during construction to review submittals, answer Requests for Information (RFIs) and Contract Change Orders (CCOs).

Tetra Tech was the only company that responded to the RFP. They understand the City’s needs for this project as outlined in the Scope of Work. Tetra Tech is a multi-disciplinary firm providing engineering and surveying services. They provide design and construction management of new roof installations.

Based on the proposal and project needs, staff negotiated a final scope and fees with Tetra Tech in the amount of $ 86,395 for services for the project. Staff recommends a 20% contingency, in the amount of $ 17,279, which will be added to the total design budget and included in the agreement.

The design of the project is scheduled to once the contract is executed, and the planned duration of design is four months. Construction of this project is planned to begin in fall of 2023 and carry over into the following year.

FISCAL IMPACT
The budget for Engineering Services with Tetra Tech is estimated to be $86,395.00 plus a 20% contingency amount of $ 17,279.00 for a total amount of $103,674. Although this project was planned in the CIP Master Plan and FY22-24 Budget, the amount allocated is insufficient. Due to the extensive termite damage and sensitivity of the equipment in this facility, a new roof design is needed. A fiscal appropriation is required in the amount of $63,674 to 520-840-5821.239.

OPTIONS

1. Approve staff’s recommendation.

2. Provide alternative direction.

ATTACHMENTS
Professional Services Agreement with Tetra Tech, Inc.

Reviewed by: Approved by:

Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Prepared by:
3 _______________________
Carla Dillon, P.E.

Public Works Director

CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN
THE CITY OF LOMITA AND TETRA TECH, INC.

Page 1 of 13 ends

This AGREEMENT for New Roof Design for Appian Way Pumping Station is entered into this 18th day of April, 2023, by and between the CITY OF LOMITA, a general law city and municipal corporation (“CITY”) and TETRA TECH, INC. (“CONTRACTOR”).

R E C I T A L S
A. CITY does not have the personnel able and/or available to perform the services required under this agreement.

B. Therefore, CITY desires to contract out for New Roof Design for Appian Way Pumping Station.

C. CONTRACTOR warrants to CITY that it has the qualifications, experience and facilities to perform properly and timely the services under this Agreement.

D. CITY desires to contract with CONTRACTOR to perform the services as described in Exhibit A of this Agreement.

NOW, THEREFORE, based on the foregoing recitals, CITY and CONTRACTOR agree as follows:

1. CONSIDERATION AND COMPENSATION.

A. As partial consideration, CONTRACTOR agrees to perform the work listed in the SCOPE OF SERVICES, attached as Exhibit A;
B. As an additional consideration, CONTRACTOR and CITY agree to abide by the terms and conditions contained in this Agreement.

C. As additional consideration, CITY agrees to pay CONTRACTOR an amount not to exceed $ 103,674 for CONTRACTOR’s services, unless otherwise specified by written amendment to this Agreement. CONTRACTOR agrees, however, that the proposed cost of the services under this AGREEMENT is $86,395. If CONTRACTOR incurs expenses exceeding the proposed cost of $86,395, such amounts shall require written authorization by City Staff in order for CONTRACTOR to receive compensation for those costs.

D. No additional compensation shall be paid for any other expenses incurred, unless Attachment 1

Page 2 of 13 ends

first approved by the City Manager or his designee.

E. CONTRACTOR shall submit to CITY, by not later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous month. CITY shall pay CONTRACTOR all uncontested amounts set forth in the CONTRACTOR'S bill within 30 days after it is received.

2. SCOPE OF SERVICES.

A. CONTRACTOR will perform the services and activities set forth in the SCOPE OF SERVICES attached hereto as Exhibit A and incorporated herein by this reference.

If any part of Exhibit A is inconsistent with the terms of this Agreement, the terms of this Agreement shall control.

B. Except as herein otherwise expressly specified to be furnished by CITY, CONTRACTOR will, in a professional manner, furnish all the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or proper to perform and complete the work and provide the professional services required of CONTRACTOR by this Agreement.

3. PAYMENTS. For CITY to pay CONTRACTOR as specified by this Agreement, CONTRACTOR must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period.

4. TIME OF PERFORMANCE. The services of CONTRACTOR are to commence upon receipt of a notice to proceed from CITY and shall continue until all authorized work is completed to CITY’s reasonable satisfaction, in accordance with the schedule incorporated in “Exhibit A,” unless extended in writing by CITY.

5. FAMILIARITY WITH WORK. By executing this Agreement, CONTRACTOR represents that CONTRACTOR has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

6. KEY PERSONNEL. CONTRACTOR’s key person assigned to perform work under this Agreement is Eric Yuen. CONTRACTOR shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire on April 30, 2024, unless earlier termination occurs under Section 13 of this Agreement or extended in writing in advance by both parties.

Page 3 of 13 ends

8. BEST MANAGEMENT PRACTICES AND TRAINING. The contractor shall implement and maintain activity specific Best Management Practices (BMPs) to prevent pollutant loading from stormwater and non-stormwater discharges to receiving waters as required in Municipal NPDES Permit No. CAS004004. Contracting staff whose primary job duties are related to implementation of BMPs shall be adequately trained to effectively implement, operate, and maintain such BMPs and must be versed in factors affecting BMP effectiveness. The contractor shall certify they have received all applicable training to implement the requirements in Municipal NPDES Permit No.

CAS004004 and shall provide documentation to that effect.

9. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum, and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONTRACTOR and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with the written agreement between the parties.

10. TAXPAYER IDENTIFICATION NUMBER. CONTRACTOR will provide CITY with a Taxpayer Identification Number.

11. PERMITS AND LICENSES. CONTRACTOR will obtain and maintain during the term of this Agreement all permits, licenses, and certificates that may be required by local, state, and federal laws in connection with the performance of services under this Agreement, including a business license as specified in Title VI, Chapter 2 of the Lomita Municipal Code.

12. LAWS AND REGULATIONS; EMPLOYEE/LABOR CERTIFICATION.

CONTRACTOR shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. CONTRACTOR shall be liable for all violations of such laws and regulations in connection with the Services and this Agreement. All violations of such laws and regulations shall be grounds for CITY to terminate the Agreement for cause.

13. PREVAILING WAGE.

A. Prevailing Wage. CONTRACTOR is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, CONTRACTOR agrees to fully comply with such Prevailing Wage Laws.

Upon request, CITY shall provide CONTRACTOR with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

CONTRACTOR shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available

Page 4 of 13 ends

to interested parties upon request and shall post copies at the CONTRACTOR’S principal place of business and at the project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code within this Agreement, and CONTRACTOR shall therefore comply with such Labor Code sections to the fullest extent required by law.

CONTRACTOR shall defend, indemnify and hold the CITY, its officials, officers, employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

B. Registration/DIR Compliance. If the services are being performed on a public works project of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, CONTRACTOR and all subcontractors must be registered with the Department of Industrial Relations (“DIR”). CONTRACTOR shall maintain registration for the duration of the project and require the same of any subcontractors. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be CONTRACTOR’S sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Any stop orders issued by the DIR against CONTRACTOR or any subcontractors that affect CONTRACTOR’S performance of services, including any delay, shall be CONTRACTOR’S sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONTRACTOR caused delay and shall not be compensable by CITY.

CONTRACTOR shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONTRACTOR or any subcontractor.

C. Labor Certification. By its signature hereunder, CONTRACTOR certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code and agrees to comply with such provisions before commencing the performance of the Services.

D. Employment of Apprentices. CONTRACTOR and all subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

E. CONTRACTOR or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between CONTRACTOR and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money

Page 5 of 13 ends

that is paid or may have been paid to a debarred subcontractor by CONTRACTOR on the project shall be returned to CITY. CONTRACTOR shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

F. CONTRACTOR agrees to bind every subcontractor to the terms of the Agreement as far as such terms are applicable to subcontractor’s portion of the work.

CONTRACTOR shall be as fully responsible to CITY for the acts and omissions of its subcontractor and of persons either directly or indirectly employed by its subcontractor, as CONTRACTOR is for acts and omissions of persons directly employed by CONTRACTOR. Nothing contained in these Agreement shall create any contractual relationship between any subcontractor and CITY.

14. TERMINATION.

A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.

B. CONTRACTOR may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.

C. In the event of such termination, CONTRACTOR shall cease services as of the date of termination, all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONTRACTOR shall, at CITY’s option, become CITY’s property, and CONTRACTOR will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.

D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

15. INDEMNIFICATION.

A. CONTRACTOR shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY’S passive negligence, but excepting such loss or damage which is caused by the sole active negligence or willful misconduct of CITY. Should CITY in its sole discretion find CONTRACTOR’S legal counsel unacceptable, then CONTRACTOR shall reimburse CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation.

CONTRACTOR shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State

Page 6 of 13 ends

of California and will survive termination of this Agreement.

B. The requirements as to the types and limits of insurance coverage to be maintained by CONTRACTOR as required by Section 19, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONTRACTOR pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

16. ASSIGNABILITY. This Agreement is for CONTRACTOR’s professional services.

CONTRACTOR’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.

17. INDEPENDENT CONTRACTOR. CITY and CONTRACTOR agree that THE CONTRACTOR will act as an independent contractor and will have control of all work and the manner in which is it performed. THE CONTRACTOR will be free to contract for similar service to be performed for other employees while under contract with CITY. CONTRACTOR is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the work or to exercise a measure of control over the work means that CONTRACTOR will follow the direction of the CITY as to end results of the work only.

18. AUDIT OF RECORDS.

A. THE CONTRACTOR agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement.

CONTRACTOR agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement.

CONTRACTOR further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.

B. CONTRACTOR will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement.

19. CORRECTIVE MEASURES. CONTRACTOR will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONTRACTOR will be given a reasonable amount of time as determined by CITY to implement said corrective measures. Failure of CONTRACTOR to implement required corrective measures shall result in immediate termination of this Agreement.

Page 7 of 13 ends

20. INSURANCE REQUIREMENTS.

A. CONTRACTOR, at CONTRACTOR’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies:

1. Workers Compensation Insurance as required by law. CONTRACTOR shall require all subcontractors similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers’ Compensation policies must be received by CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against CITY, its officers, agents, employees, and volunteers for losses arising from work performed by CONTRACTOR for CITY.

2. General Liability Coverage. CONTRACTOR shall maintain commercial general liability insurance in an amount of not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.

3. Automobile Liability Coverage. CONTRACTOR shall maintain automobile liability insurance covering bodily injury and property damage for all activities of CONTRACTOR arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.

4. Professional Liability Coverage. CONTRACTOR shall maintain professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors, or omissions which may arise from CONTRACTOR’S operations under this Agreement, whether such operations be by CONTRACTOR or by its employees, subcontractors, or subcontractors. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single-limit-per-occurrence basis. When coverage is provided on a “claims made basis,” CONTRACTOR will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated.

Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONTRACTOR for all claims made by CITY arising out of any errors or omissions of CONTRACTOR, or its officers, employees or agents during the time this Agreement was in effect.

B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of

Page 8 of 13 ends

California, or which is approved in writing by CITY, and shall be endorsed as follows. CONTRACTOR also agrees to require all contractors, and subcontractors to do likewise.

1. “The CITY, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the CONTRACTOR, including materials, parts, or equipment furnished in connection with such work or operations.”

2. This policy shall be considered primary insurance as respects CITY, its elected or appointed officers, officials, employees, agents, and volunteers.

Any insurance maintained by CITY, including any self-insured retention CITY may have, shall be considered excess insurance only and shall not contribute with this policy.

3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.

4. The insurer waives all rights of subrogation against CITY, its elected or appointed officers, officials, employees, or agents.

5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to CITY, its elected or appointed officers, officials, employees, agents, or volunteers.

6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days’ written notice has been received by CITY.

C. CONTRACTOR agrees to provide immediate notice to CITY of any claim or loss against Contractor arising out of the work performed under this agreement.

CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.

D. Any deductibles or self-insured retentions must be declared to and approved by CITY. At CITY’s option, CONTRACTOR shall demonstrate financial capability for payment of such deductibles or self-insured retentions.

E. CONTRACTOR shall provide certificates of insurance with original endorsements to CITY as evidence of the insurance coverage required herein.

Certificates of such insurance shall be filed with CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with CITY at all times during the term of this Agreement.

Page 9 of 13 ends

F. Failure on the part of CONTRACTOR to procure or maintain required insurance shall constitute a material breach of contract under which CITY may terminate this Agreement pursuant to Section 13 above.

G. The commercial general and automobile liability policies required by this Agreement shall allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and/or deductible of the policy in lieu of the CONTRACTOR (as the named insured) should CONTRACTOR fail to pay the SIR or deductible requirements. The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. CONTRACTOR understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONTRACTOR as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONTRACTOR’S behalf upon CONTRACTOR’S failure or refusal to do so to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against Contractor for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

21. USE OF OTHER CONTRACTORS. THE CONTRACTOR must obtain CITY’s prior written approval to use any Contractors while performing any portion of this Agreement. Such approval must include approval of the proposed Contractor and the terms of compensation.

22. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONTRACTOR of the final payment made under this Agreement shall operate as and be a release of CITY from all claims and liabilities for compensation to the CONTRACTOR for anything done, furnished or relating to the CONTRACTOR’S work or services. Acceptance of payment shall be any negotiation of CITY’S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by CITY shall not constitute, nor be deemed, a release of the responsibility and liability of CONTRACTOR, its employees, sub-Contractors and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by CITY for any defect or error in the work prepared by CONTRACTOR, its employees, sub-Contractors and agents.

23. CORRECTIONS. In addition to the above indemnification obligations, the CONTRACTOR shall correct, at its expense, all errors in the work which may be disclosed during the CITY’S review of CONTRACTOR’S report or plans. Should the CONTRACTOR fail to make such correction in a reasonably timely manner, such correction shall be made by CITY, and the cost thereof shall be charged to CONTRACTOR. In addition to all other available remedies, CITY may deduct the cost of such correction from any retention amount held by CITY or may withhold payment otherwise owed CONTRACTOR under this Agreement up to the amount of the cost of correction.

Page 10 of 13 ends

24. NON-APPROPRIATION OF FUNDS. Payments to be made to CONTRACTOR by CITY for services preformed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONTRACTOR’S services beyond the current fiscal year, the Agreement shall cover payment for CONTRACTOR’S only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.

25. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

CITY CONTRACTOR
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
ATTN: City Manager
Tetra Tech
160 E. Via Verde Suite 240,
San Dimas, CA 91773
ATTN: Eric Yuen
Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

26. SOLICITATION. CONTRACTOR maintains and warrants that it has not employed nor retained any company or person, other than CONTRACTOR’s bona fide employee, to solicit or secure this Agreement. Further, CONTRACTOR warrants that it has not paid, nor has it agreed to pay any company or person, other than CONTRACTOR’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONTRACTOR breach or violate this warranty, CITY may rescind this Agreement without liability.

27. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONTRACTOR and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the CONTRACTOR’s or CITY’s obligations under this Agreement.

28. INTERPRETATION. This Agreement was drafted in and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.

Page 11 of 13 ends

29. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.

30. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

31. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY’s city administrator, or designee, may execute any such amendment on behalf of CITY.

32. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

33. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.

34. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.

35. ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.

36. STATEMENT OF EXPERIENCE. By executing this Agreement, CONTRACTOR represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY.

CONTRACTOR represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private Contractors, and experience in dealing with public agencies all suggest that CONTRACTOR is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.

Page 12 of 13 ends

37. DISCLOSURE REQUIRED. (CITY and CONTRACTOR initials required at one of the following paragraphs)
By their respective initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is a “contractor” for the purposes of the California Political Reform Act because CONTRACTOR’S duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a)(2) or otherwise serves in a staff capacity for which disclosure would otherwise be required were CONTRACTOR employed by CITY. CONTRACTOR hereby acknowledges his or her assumingoffice, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the CITY’S Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to the Contractor commencing services hereunder, the City’s Manager shall prepare and deliver to CONTRACTOR a memorandum detailing the extent of CONTRACTOR’S disclosure obligations in accordance with the CITY’S Conflict of Interest Code.

City Initials ______
Contractor Initials ______
OR
By their initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is not a “contractor” for the purpose of the California Political Reform Act because CONTRACTOR’S duties and responsibilities are not within the scope of the definition of contractor in Fair Political Practice Commission Regulation 18700.3(a)(2) and is otherwise not serving in staff capacity in accordance with CITY’S Conflict of Interest Code.

City Initials ______
Contractor Initials ______
[signatures on following page]

Page 13 of 13 ends

IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

CITY OF LOMITA CONTRACTOR
Ryan Smoot, City Manager By: Eric Yuen, Structural Project Manager ATTEST:
95-4148514
Kathleen Horn Gregory, City Clerk Taxpayer ID No.

APPROVED AS TO FORM:

Trevor Rusin, City Attorney

CITY OF LOMITA

REQUEST FOR PROPOSAL (RFP)

ENGINEERING SERVICES
FOR
New Roof Design for Appian Way Pump Station

RFP DEADLINE
MARCH 16, 2023
1:00 P.M.

Exhibit A

TABLE OF CONTENTS

SECTION I

GENERAL
INFORMATION.................................................................................................................................... 3

SECTION II
PROPOSAL REQUIREMENTS..............................................................................................................6

SECTION III
SCOPE OF SERVICES.......................................................................................................................11

SECTION IV
SELECTION OF CONSULTANTS......................................................................................................14 Attachment A – General City Map
Attachment B – AS BUILT DRAWINGS OF THE PUMP STATION STRUCTURE AND THE ROOF
Attachment C – Professional Services Agreement (Sample) 2 SECTION I

GENERAL INFORMATION
A. INTRODUCTION / BACKGROUND
The City of Lomita is requesting proposals from qualified and experienced Civil Engineering firm(s) to design new roof for the Appian Way Pump Station.

The City of Lomita is an urban, densely populated 1.97 square miles (total area is 1,261 acres), located at the base of the Palos Verdes Peninsula in the Los Angeles Basin, Los Angeles County. The City of Lomita is located in the southwestern part of Los Angeles County, 26 miles south of downtown Los Angeles and bounded by the City of Torrance on the north and west, the Harbor Region of Los Angeles to the east, and the City of Rolling Hill Estates on the southwest; and the City of Rancho Palos Verdes and unincorporated Los Angeles County area to the southeast. The City is almost completely developed with mostly residential neighborhoods and commercial units.

The City’s water system includes the Appian Way Pump Station that controls working pressure in three zones. The pump station also monitors water supply to the higher elevation tank.

B. PROJECT DESCRIPTION
This building is more than 30 years old and has the original roof that has one exhaust fan and four skylights. The skylight vertical side shows termite infiltration. This is a 24/7-hour operational facility that controls pressure and water supply to a critical tank. . The roof needs repair, replacement, and/or termite infiltration treatment. It is not possible to tent this building for fumigation as drinking water pumps are in this building. Since the building structure is wood and old, typical Orange Treatment will not remove termites completely. So, the approach is to remove the roof with wood support structure and design new support and roof using material resistant to termite infestation.

The Engineering Consultant will design a new roof with trusses to cover this building using material resistant to termite infestation. The design will include four (4) skylights and one (1) exhaust fan designed at the same location as the existing roof. The skylights are to be located above the center line of the existing equipment grounded on the existing flooring of the building. This is required to lift the equipment through the roof in case the equipment need maintenance repair or replacement.
3 C. DESCRIPTION OF WORK
The purpose of this RFP is to seek the services from an Engineering firm/Consultant to assess the condition of the roof and roof structural elements and design new roof structure, roof skin and roof top resistant to Termites, and include demolition plans for City of Lomita’s Appian Way Pumping Plant and Pressure Reducing Station. Services will include, but not be limited to:
• Collect and review existing building roof condition, termite infiltration and damage, prepare a report detailing extent of the damage. The report shall include a proposed solution to remedy the termite damage and provide a minimum of 30 years life of the roof and structural elements. • Prepare demolition plans for removing existing roof structure and disposition of termite infected roof, skylight tube structure and preserve four (4) skylights and one (1) exhaust fan.
• Prepare preliminary and final design of termite resistant trusses and roof structure to replace existing roof. Prepare full Plans Specifications & Estimates (PS&E) of probable construction costs in preparation for bidding. • Project constraints include: 1) Water crew members will need to access the facility throughout the duration of construction to operate and maintain the facility; 2) No chemical application will be allowed within the building; 3) Construction noise will need to be minimized as this is a residential area; 4) electronic equipment within the building will need to be protected and operational during the project; and 5) Materials, including the roof and all elements, will need to be termite resistant with a life expectancy of last at least 30 years. • Provide project administration and construction support for the roofing contractor selected by the City of Lomita to replace and install the new roof. • Hold monthly meetings to update City of Lomita staff on design development. • Provide the Engineering support during demolition & attend the construction meetings while the roofing contractor is demolishing old roof, installing the new roof.

In addition, the consultant shall produce Construction Plans and Drawings, Project Specifications and Estimate (PS&E) subject for review and approval by the City Engineer. Additional services shall include professional support during the bidding process of the project as well as support during construction to review submittals and answer Request for Information (RFI).

The contract will be regulated according to the provisions of all Federal, State and local laws and ordinances that are applicable. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code, Section 1775.
4 F. PROJECT DURATION
The estimated time for to complete this design is four (4) months, which can be subdivided for review as follows:
• Investigation and Analysis Report on Roof
• PS & E – 60%
• PS & E – 100%, including all design change recommendations from city of Lomita staff.

One (1) digital pdf, one (1) native digital file, and two (2) physical copies of the Final Design and documents shall be submitted to the City.

G. PROJECT INITIATION SCHEDULE
A tentative schedule is included below. The proposals submitted shall use this schedule as a guide to further define an appropriate work schedule in accordance with the requirements of the Scope of Services in Section III. The final schedule will be negotiated based on the final scope of work and work plan agreed to by the City and the selected consultant.

Milestone Date
RFP Release February 23, 2023
Job Walk March 6, 2023
Last Day for Questions March 8, 2023
Issue Addendum March 10, 2023
Proposal Deadline March 16, 2023
Consultant Interviews March 24, 2023
Expected City Council Approval April 4, 2023
Kick-off & Notice to Proceed April 11, 2023
*Dates are estimates
5 A. GENERAL

SECTION II

PROPOSAL REQUIREMENTS
The proposal must be concise, well organized and should demonstrate your firm’s team qualifications and experience related to this project. The proposal shall be printed on 8½" x 11" pages and include resumes, past experience, graphs, tables, etc. It must include the following:

I. Cover Letter (one page): Provide a one-page cover letter, which includes the firm name, name, address, and telephone number of the person(s) to be used for contact who will be authorized to make presentations for the firm. The cover letter must bear the signature of the person authorized to sign on behalf of the proposer and to bind the applicant in a contract. The cover letter will include a statement offering the proposer's acceptance of all conditions listed in the "Request for Proposals" document. Any exception on the Proposer's behalf must be stated in the proposal cover letter.

II. Qualification and Experience (maximum of 10 pages): The proposed Engineering Team shall have experience working with public agencies and/or water purveyors in similar assignments. It is highly desirable that the key project team members have served public agencies in various capacities, are accustomed to working with governmental agencies, have a good understanding of public agency issues, procedures, and policies.

Qualifications and experience to be shown in the proposal shall include, but not be limited to the following:
• Project organizational chart.
• Identification of experience of principal staff members, including major subconsultants. Resumes of principal staff should not exceed one page per person.
• Identify the availability of your team and the percentage of current workload of staff that would be committed to this project, including sub-consultants. • Experience of the firm, the team and subconsultants on similar projects.

III. Scope of Work and Project Approach (maximum 10 pages): The Consultant shall include in their proposal a detailed scope of work and understanding of the process to undertake such a project and complete it in compliance with all applicable rules, regulations, standards and requirements. Other items to include:
• Description of your firm's quality/control (Q/C) and quality/assurance (Q/A) procedures that will be used for the Project.
• Provide a project schedule for various activities by the Engineering Team involved and identify the milestones of major tasks of the Project. • Discussion of document control.
6 IV. Consultant shall submit a fee proposal for the Project in a SEPARATE SEALED ENVELOPE (or separate email attachment) marked “Fee Proposal” along with the Project title. The City will negotiate with the top-ranked consultant in compliance with all applicable federal, state, and local guidelines.

Fee proposal shall include all tasks required to perform the work with a maximum not-to-exceed fee for each task and a grand total not-to-exceed fee.

The fee proposal must contain a task and fee breakdown of all components of cost, including labor base rate, overhead and all other direct and indirect costs.

The fee proposal shall clearly show hours and cost per task. The task and fee breakdown must match the scope of services in the format, as presented within the RFP. The Consultant and all sub-consultants shall not be compensated by the City for any time spent on commuting to or from the Project site and other peripheral work not directly performed as a result of this Project. The Consultant shall provide their services for the duration of the Project for the approved scope of work and fee. The proposal must remain valid for at least 90 days from the due date of this RFP.

The City will short list the list of candidates to three consulting firms, of which it may interview prior to selection of the top candidate for the project.

V. Prevailing wages will apply if the services to be performed meet the criteria according California Department of Industrial Relations web site at:
http://www.dir.ca.gov/dlsr/statistics_research.html. City will not assume any responsibility for Contractor’s failure to pay prevailing wages in accordance with State law.

B. EXAMINATION OF PROPOSAL DOCUMENTS
By submitting a proposal, Consultant represents that it has thoroughly examined and become thoroughly familiar with the work required under this RFP and has the staffing and resources capable of performing quality work to achieve the City’s objectives.

C. ADDENDA
Any changes to the requirements will be made by written addendum to this RFP.

Any written addenda issued pertaining to this RFP shall be incorporated into the terms and conditions of any resulting Agreement. City will not be bound to any modifications to or deviations from the requirements set forth in this RFP as the result of oral instructions. Consultants shall acknowledge receipt of addenda in their proposals.

D. QUESTIONS AND ADDITIONAL INFORMATION
Questions relating to this RFP shall be emailed to the Public Works Department at:
7 [email protected] no later than Wednesday, March 8, 2023, at 1:00PM.

E. PROPOSAL SUBMITTAL
Proposals are due on or before Thursday March 16, 2023, at 1:00PM.

One (1) electronic PDF copy of the proposal shall be emailed to the Public Works Department at: [email protected] with Proposal for:

New Roof Design for Appian Way Pump Station in the email Title.

The Fee Proposals shall be emailed to the Public Works Department at:
[email protected] with Fee Proposal for: New Roof Design for Appian Way Pump Station
F. INSURANCE REQUIREMENTS
The successful Consultant shall procure and maintain, for the duration of the contract, insurance policies as listed in Section 17 - Insurance Requirements of the attached sample Professional Service Agreement (PSA), attachment B.

All insurance policies must be open to inspection by the City and copies of policies must be submitted to the City and/or upon written request.

G. SELECTION CRITERIA
Responses to this RFP will be evaluated using a point rating system, as shown in Section IV. The evaluation will be completed by a selection committee composed of staff from the Public Works Department.

H. CHANGES IN THE RFP
Should any prospective proposer be in doubt as to the true meaning of any portion of this (RFP), or should the proposer find any ambiguity, inconsistency, or omission therein, the Proposer shall make a written request for an official interpretation or correction. Such requests must be received by the Public Works Department not less than five (5) working days prior to the final date of submittal of the proposals.

Such interpretation or correction, as well as any additional RFP provisions that the City may decide to include, will be made only as an official addendum, and will be sent to each firm recorded as having received a copy of the RFP. Any addendum issued by the City shall become part of the RFP and will be incorporated into the proposal.
8 I. DISCLOSURES
Under the Freedom of Information Act (Public Act 442), the City is obligated to permit review of its files, if requested by others. All information in a submitter’s proposal is subject to disclosure under this provision. This act also provides for a complete disclosure of contracts and attachments thereto.

J. POST-SUBMITTAL PROCEDURES
After reviewing and evaluating the proposals that are received, the City will select one or more firms with whom it will negotiate a Professional Services Agreement (PSA).

A sample of the standard PSA is included in Attachment B. Those who wish to submit a proposal to the City are required to carefully review the PSA.

The PSA will include a Scope of Services and Fee Schedule (not-to-exceed amount), both of which may be modified by mutual consent during the negotiation phase. The Insurance Requirements outlined in the PSA may not be revised or changed. Prior to its final execution by the selected firm and the City, the PSA must be submitted to, and approved by, City Council and/or the City Manager.

The City reserves the right to award the total proposal, to reject any and all proposals in whole or in part, and to waive any informality or technical defects if, in the City’s sole judgment, the best interests of the City will be so served.

K. COST LIABILITY
The City of Lomita assumes no responsibility or liability for costs incurred by the Consultant prior to the execution of a Professional Services Agreement. The liability of the City is limited to the terms and conditions outlined in the Agreement.

L. INVOICES
Consultant shall submit invoice(s) at the end of each month for the work performed.

Each invoice at a minimum shall include the following information:

1. Project name

2. Period for which invoice is submitted

3. Invoice number

4. Task name

5. Balance remaining and percent completed for each task

6. Total project budget (approved tasks only) and remaining balance

7. Each employee’s name, hours of work, date, task, rate, and total charge

8. Invoices must be accompanied by payroll and any other supporting documents that will be necessary to expedite the review and approval process.
9 M. GUIDELINES DURING COVID-19 PANDEMIC
Consultants/contractors shall comply with all local, state and federal laws and regulations including, but not limited to, the Governor’s and Los Angeles County Health Officer’s orders and guidance related to COVID-19, social distancing, and best practices.

Consultants/Contractors are required to check with the latest guidelines of the Los Angeles County Public Works and the Los Angeles County Public Health for construction sites during the Coronavirus/COVID-19 pandemic.

Disclosure: Consultants shall disclose in their responses to any Request for Proposals whether they have been the subject of any legal investigation by County, State, and/or Federal agencies within the past 5 years. If so, each responding consultant shall identify the agency and contact person, the nature of the investigation and any determination over outcome of said investigation. Noncompliance with this section shall result in rejection of the Proposal, but a consultant’s disclosure of any such investigation (even one which resulted in a determination that was adverse, to the consultant) will not automatically result in rejection of the Proposal. The occurrence, nature, underlying facts and outcome of any such investigation are not by themselves determinative but are simply included among many factors that will be considered by the City in evaluating Proposals.
10 SECTION III

SCOPE OF SERVICES

DESCRIPTION
This RFP is to solicit proposals for engineering services to design new roof. The following scope of work is a minimum suggested scope for the work of the project. The City of Lomita is requesting proposals from qualified and experienced Civil Engineering firm(s) to design new roof for the Appian Way Pump Station.

The Consultant may provide additional tasks which they feel is pertinent to or adds value to achieving the City’s overall project objectives.

The following tasks include, but are not limited to:

Task 1 – General Project Administration & Meetings
• Consultant shall assign a project manager that will serve as the point of contact and coordinate all communication with the City of Lomita staff. The Consultant must provide an experienced Engineering Team that has knowledge and understanding of structural engineering, building design, and constructability. • Consultant shall coordinate a kick-off meeting with Lomita staff and subconsultants to discuss the scope of the project, develop a work plan to accomplish the project goals, schedule, and identify future constraints. • In addition to the kick-off meeting, the Consultant shall plan for sufficient meetings with Lomita staff to complete the project. Consultant shall prepare agendas for all meetings and submit them to the City two (2) working days prior the meeting for review. For each meeting, Consultant shall record minutes and distribute them within five (5) working days of the meeting. • Consultant shall submit monthly progress reports with each invoice. Progress reports shall contain work performed, project concerns and impacts, and the work anticipated for the next month.
• Invoices shall detail the team member, hours worked, task, and date of hours worked.

Task 2 – Data Research and Investigation
• Consultant shall review existing records, and research availability of other records.
• Consultant shall conduct investigations at the Appian Way Pump Station roof, assess the condition, and recommend a solution for roof (including all elements) for repair or replacement.
• Consultant shall research and identify all permitting requirements from pertinent agencies for the design and construction operations such as Los Angeles County Building Department, Los Angeles County Fire Department, 11 and the State Division of Drinking Water.

Deliverables: The consultant shall prepare and submit final report, one (1) digital pdf copy, one native format file, and two (2) hard copy for City’s review and approval.

Task 3 – Plans, Specifications and Estimate (PS&E)
The selected Consultant must provide an experienced Civil Engineering Team who has successfully delivered services on similar projects.

Task 3.1 – Plans and Specifications
The Consultant shall create plans and specifications to include the following:
• Replacement roof
• Precise replacement of skylights for equipment access • Consideration of facility operation during construction • Consideration of noise impacts on neighbors
• No chemical fumigation will be allowed within the building. • Electronic equipment within the building will need to be protected and operational during the project.
• Materials, including the roof and all elements, will need to be termite resistant with a life expectancy of last at least 30 years.

Task 3.2 – Engineer’s Estimate
The Consultant shall prepare a preliminary engineer’s estimate of the probable construction cost for this project.

Deliverables:

The consultant shall prepare and submit PS & E for City’s review and approval at the following stages of design:
• 60% Plans
• 100% Plans
One (1) digital pdf copy, one (1) native file copy, and two (2) hard copy of the plans per percentage produce shall be submitted to the City for review. Upon receipt of final comments from the City, Consultant will prepare 100% Plan and Specifications for City’s final review and approval.

Task 4 – Bid Packages
The Consultant shall prepare a bid package including the plans, specifications and any other documents necessary to release for bids.
12 Deliverables:

One (1) digital pdf copy, one (1) digital native file, and two (2) hard copies of the City approved design plans and specifications signed and stamped by a licensed Civil Engineer shall be submitted to the City.

Task 5 – Bid and Construction Support
The Consultant shall provide professional support during bidding process and construction activities. Consultant shall perform the following, but are not limited, lists of activities.
• Provide answers and information to bid questions or inquiry. • Consultant shall respond to Requests for Information (RFIs) or Requests for Clarification (RFCs) and prepare the bid addenda as required. • Attend Pre-bid meeting.
• Attend Pre-construction meeting.
• Review construction submittals
• Respond to Request for Information (RFI)
• Assist in cost estimate and analysis for Contract Change Order (CCO) • Complete As-built drawings based upon actual construction. 13 SECTION IV

SELECTION OF CONSULTANTS
All proposals will be evaluated by a City of Lomita Selection Committee (Committee). The Committee may be composed of City of Lomita staff and other parties that may have expertise or experience in the services described herein. The Committee will review the submittals and will rank the proposals. The evaluation of the proposals shall be within the sole judgment and discretion of the Committee. All contacts during the evaluation phase shall be through the City of Lomita Project Manager only.

The selection committee will review the submitted proposals according to the below evaluation criteria and weighting factors. The committee will then establish a shortlist based on the highest ranked proposals. The shortlist will include enough qualified consultants to ensure that at least three consultants are interviewed.

After the interview, the committee will reestablish a final ranking of the highest ranked consultants. The highest ranked consultant will be selected for the project. Cost proposals for all qualified consultants will be opened and used to begin negotiations, however, with the highest ranked consultant. If an agreement on fees cannot be reached, then negotiations will proceed to the second highest qualified consultant, and so on and so forth until a final agreement is reached with a consultant.

The proposals will be evaluated based on the following:

A. PROFESSIONAL QUALIFICATIONS - 20 points
Identify individuals who will be assigned to this project by name, title and their role on this project. Indicate which of these individuals you consider key to the successful completion of the project. Resumes or qualifications are required for proposed project personnel who will be assigned to the project. Qualifications and capabilities of any sub-consultants shall be included.

B. PAST EXPERIENCE WITH SIMILAR PROJECTS - 30 points
The written proposal must include a list of specific experience in the project design area and indicate proven ability in designing similar projects for the firm and the individuals to be assigned to the project. Experience should include design of roof structures for critical infrastructure with operational requirements during construction and within residential zones. The proposal should also indicate the ability to have projects completed within the budget and schedule. A complete list of client references must be provided for similar projects completed within the last two years. It shall include the firms/agencies name, address, telephone number, project title, and contact person.
14 C. PROPOSED WORK PLAN – 40 points
A detailed work plan is to be presented and should outline the overall project understanding, approach, and list all tasks determined to be necessary to accomplish the overall scope of the project. The work plan shall include, but is not to be limited to, the objectives/tasks listed in Section III of the RFP. The work plan shall define resources needed for each task (title and labor hours) and staff persons completing the project element tasks. In addition, the work plan shall include a timeline schedule depicting the sequence and duration of tasks showing how the work will be organized and executed.

The work plan shall be sufficiently detailed and clear to identify the progress milestones, i.e. when project elements, measures, and deliverables are to be completed. Additional project elements suggested by the proposer that are thought to be necessary for the completion of the project are to be included in the work plan and identified as proposer-suggested elements.

Identify all of those, if any, who will be subcontracted to assist you with this project, and the extent of work for which they will be responsible. Include similar reference data for subcontractors and employees as requested above for the main proposer.

Include any other information that you believe to be pertinent but not specifically asked for elsewhere.

D. FEES - 10 points
Submit a fee schedule in a separate sealed envelope with proposal. Fee schedule shall clearly identify each task, number of hours assigned to each task, name and title of individual assigned to each task, hourly rate of each individual, and total hours and total dollar amount for the project.

E. AUTHORIZED NEGOTIATOR
Include the name and phone number of person(s) in the organization authorized to negotiate the Professional Services Agreement with the City. 15 ATTACHMENT - A

GENERAL CITY MAP
253rd St
Narbonne Ave
Oak St
Lomita Blvd
Oak St
Walnut St
Cypress St
Lomita Blvd
255th St
250th St
Narbonne Ave
Pennsylvania Ave
248th St
Western Ave
263rd St
Pacific Coast Hwy
254th St
253rd St
Feijoa Ave
Palos Verdes Dr N
242nd St
261st St
Eshelman Ave
245th St
Appian Way
Ebony Ln
Regent Ave
Andreo Ave
260th St
251st St
240th St
Rolling Vista Dr
Cayuga Ave
243rd St
Via Madonna
253rd Pl
257th St
256th St
262nd St
Via Desmonde
246th Pl
259th Pl
247th St
246th St
249th St
241st St
Viana Ave
Woodward Ave
Moon Ave
Crenshaw Blvd
Alta Vista Ave
252nd St
Doria Ave
Glentree Dr
247th Pl
Fairview Ave
Dawn St
Turrell St
Lucille Ave
Reed Dr
Bland Pl
Market Pl
Guyson St
Hillworth Ave
Lomita Park Pl
Allbrook St
Kelley Ave
Callison St
Chapman St
Alliene Ave
Nordman St
Steed Ct
Saddle View Rd
Cadiz Dr
Falena Ave
April Ct
Wittick Ct
Avocado St
Via Nova
Esther View Dr
Evans Ct
Hillcrest Ave
Alcor St
Leola St
Benhill Ave
Robin Ln
Forrester Dr
Ocean View Ave
Reed St
Garner St
Via Solano
Stratford Dr
McKenna Ct
Olson Ln
Adamo Ave
Comal Ct
Bani Ave
Abita Ave
Austinbrook Ct
Neko Dr
Noelle Ct
Aubrey Ln
Cypress Circle Dr
Via Tampa
255th St
Lucille Ave
248th St
253rd St
251st St
256th St
248th St
Bani Ave
247th St
246th St
241st St
Doria Ave
247th St
261st St
Alliene Ave
253rd Pl
256th St
259th Pl
254th St
253rd Pl
257th St
262nd St
Woodward Ave
252nd St
259th St
Via Marquette
Monte Vista Ave
Lomita Dr
258th Pl
Ovid Ave 264th St
Hendricks Ave
Stanhurst Ave
Park Haven Pl
Eleanor Pl
Adona Dr
Via Enca nto
Padron Pl
Pennsylvania Dr
Murad Ave
Carlene Ln
Via Vera
Veronica Ln
Monterey Cir
Hillview Ln
Danmar Ct
Ober Ave
Becknel Ave
252nd St
Bani Ave
Appian Way
254th St 254th St
Forrester Dr

ATTACHMENT - B

AS BUILT DRAWINGS OF THE APPIAN WAY

PUMP STATION AND THE ROOF

ATTACHMENT - C

PROFESSIONAL SERVICES AGREEMENT
(SAMPLE)

CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN

THE CITY OF LOMITA AND
This AGREEMENT for Project is entered into this day of , 202_, by and between the CITY OF LOMITA, a general law city and municipal corporation (“CITY”) and (“CONTRACTOR”).

R E C I T A L S
A. CITY does not have the personnel able and/or available to perform the services required under this agreement.

B. Therefore, CITY desires to contract out for .

C. CONTRACTOR warrants to CITY that it has the qualifications, experience and facilities to perform properly and timely the services under this Agreement.

D. CITY desires to contract with CONTRACTOR to perform the services as described in Exhibit A of this Agreement.

NOW, THEREFORE, based on the foregoing recitals, CITY and CONTRACTOR agree as follows:

1. CONSIDERATION AND COMPENSATION.

A. As partial consideration, CONTRACTOR agrees to perform the work listed in the SCOPE OF SERVICES, attached as Exhibit A;
B. As additional consideration, CONTRACTOR and CITY agree to abide by the terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONTRACTOR an amount not to exceed $ for CONTRACTOR’s services, unless otherwise specified by written amendment to this Agreement.

D. No additional compensation shall be paid for any other expenses incurred, unless first approved by the City Manager or his designee.

E. CONTRACTOR shall submit to CITY, by not later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous month.

CITY shall pay CONTRACTOR all uncontested amounts set forth in the CONTRACTOR'S bill within 30 days after it is received.

2. SCOPE OF SERVICES.

A. CONTRACTOR will perform the services and activities set forth in the SCOPE OF SERVICES attached hereto as Exhibit A and incorporated herein by this reference.

If any part of Exhibit A is inconsistent with the terms of this Agreement, the terms of this Agreement shall control.

B. Except as herein otherwise expressly specified to be furnished by CITY, CONTRACTOR will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or proper to perform and complete the work and provide the professional services required of CONTRACTOR by this Agreement.

3. PAYMENTS. For CITY to pay CONTRACTOR as specified by this Agreement, CONTRACTOR must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period.

4. TIME OF PERFORMANCE. The services of CONTRACTOR are to commence upon receipt of a notice to proceed from CITY and shall continue until all authorized work is completed to CITY’s reasonable satisfaction, in accordance with the schedule incorporated in “Exhibit A,” unless extended in writing by CITY.

5. FAMILIARITY WITH WORK. By executing this Agreement, CONTRACTOR represents that CONTRACTOR has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

6. KEY PERSONNEL. CONTRACTOR’s key person assigned to perform work under this Agreement is . CONTRACTOR shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire on , unless earlier termination occurs under Section 13 of this Agreement, or extended in writing in advance by both parties.

8. BEST MANAGEMENT PRACTICES AND TRAINING. The contractor shall implement and maintain activity specific Best Management Practices (BMPs) to prevent pollutant loading from stormwater and non-stormwater discharges to receiving waters as required in Municipal NPDES Permit No. CAS004004. Contracting staff whose primary job duties are related to implementation of BMPs shall be adequately trained to effectively implement, operate, and maintain such BMPs and must be versed in factors affecting BMP effectiveness. The contractor shall certify they have received all applicable training to implement the requirements in Municipal NPDES Permit No.

CAS004004 and shall provide documentation to that effect.

9. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONTRACTOR and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.

10. TAXPAYER IDENTIFICATION NUMBER. CONTRACTOR will provide CITY with a Taxpayer Identification Number.

11. PERMITS AND LICENSES. CONTRACTOR will obtain and maintain during the term of this Agreement all permits, licenses, and certificates that may be required by local, state and federal laws in connection with the performance of services under this Agreement, including a business license as specified in Title VI, Chapter 2 of the Lomita Municipal Code.

12. LAWS AND REGULATIONS; EMPLOYEE/LABOR CERTIFICATION.

CONTRACTOR shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. CONTRACTOR shall be liable for all violations of such laws and regulations in connection with the Services and this Agreement. All violations of such laws and regulations shall be grounds for CITY to terminate the Agreement for cause

13. PREVAILING WAGE.

A. Prevailing Wage. CONTRACTOR is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, CONTRACTOR agrees to fully comply with such Prevailing Wage Laws.

Upon request, CITY shall provide CONTRACTOR with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

CONTRACTOR shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the CONTRACTOR’S principal place of business and at the project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code within this Agreement, and CONTRACTOR shall therefore comply with such Labor Code sections to the fullest extent required by law.

CONTRACTOR shall defend, indemnify and hold the CITY, its officials, officers, employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

B. Registration/DIR Compliance. If the services are being performed on a public works project of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, CONTRACTOR and all subcontractors must be registered with the Department of Industrial Relations (“DIR”). CONTRACTOR shall maintain registration for the duration of the project and require the same of any subcontractors. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be CONTRACTOR’S sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR. Any stop orders issued by the DIR against CONTRACTOR or any subcontractors that affect CONTRACTOR’S performance of services, including any delay, shall be CONTRACTOR’S sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONTRACTOR caused delay and shall not be compensable by CITY.

CONTRACTOR shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONTRACTOR or any subcontractor.

C. Labor Certification. By its signature hereunder, CONTRACTOR certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

D. Employment of Apprentices. CONTRACTOR and all subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

E. CONTRACTOR or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between CONTRACTOR and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid or may have been paid to a debarred subcontractor by CONTRACTOR on the project shall be returned to CITY. CONTRACTOR shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

F. CONTRACTOR agrees to bind every subcontractor to the terms of the Agreement as far as such terms are applicable to subcontractor’s portion of the work.

CONTRACTOR shall be as fully responsible to CITY for the acts and omissions of its subcontractor and of persons either directly or indirectly employed by its subcontractor, as CONTRACTOR is for acts and omissions of persons directly employed by CONTRACTOR. Nothing contained in these Agreement shall create any contractual relationship between any subcontractor and CITY.

14. TERMINATION.

A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.

B. CONTRACTOR may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.

C. In the event of such termination, CONTRACTOR shall cease services as of the date of termination, all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONTRACTOR shall, at CITY’s option, become CITY’s property, and CONTRACTOR will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.

D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

15. INDEMNIFICATION.

A. CONTRACTOR shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY’S passive negligence, but excepting such loss or damage which is caused by the sole active negligence or willful misconduct of CITY. Should CITY in its sole discretion find CONTRACTOR’S legal counsel unacceptable, then CONTRACTOR shall reimburse CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation.

CONTRACTOR shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

B. The requirements as to the types and limits of insurance coverage to be maintained by CONTRACTOR as required by Section 19, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONTRACTOR pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

16. ASSIGNABILITY. This Agreement is for CONTRACTOR’s professional services.

CONTRACTOR’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.

17. INDEPENDENT CONTRACTOR. CITY and CONTRACTOR agree that CONTRACTOR will act as an independent contractor and will have control of all work and the manner in which is it performed. CONTRACTOR will be free to contract for similar service to be performed for other employers while under contract with CITY. CONTRACTOR is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the work or to exercise a measure of control over the work means that CONTRACTOR will follow the direction of the CITY as to end results of the work only.

18. AUDIT OF RECORDS.

A. CONTRACTOR agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement.

CONTRACTOR agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement.

CONTRACTOR further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.

B. CONTRACTOR will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement.

19. CORRECTIVE MEASURES. CONTRACTOR will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONTRACTOR will be given a reasonable amount of time as determined by CITY to implement said corrective measures. Failure of CONTRACTOR to implement required corrective measures shall result in immediate termination of this Agreement.

20. INSURANCE REQUIREMENTS.

A. CONTRACTOR, at CONTRACTOR’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies:

1. Workers Compensation Insurance as required by law. CONTRACTOR shall require all subcontractors similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers’ Compensation policies must be received by CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against CITY, its officers, agents, employees, and volunteers for losses arising from work performed by CONTRACTOR for CITY.

2. General Liability Coverage. CONTRACTOR shall maintain commercial general liability insurance in an amount of not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.

3. Automobile Liability Coverage. CONTRACTOR shall maintain automobile liability insurance covering bodily injury and property damage for all activities of CONTRACTOR arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.

4. Professional Liability Coverage. CONTRACTOR shall maintain professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors, or omissions which may arise from CONTRACTOR’S operations under this Agreement, whether such operations be by CONTRACTOR or by its employees, subcontractors, or subcontractors. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single-limit-per-occurrence basis. When coverage is provided on a “claims made basis,” CONTRACTOR will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated.

Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONTRACTOR for all claims made by CITY arising out of any errors or omissions of CONTRACTOR, or its officers, employees or agents during the time this Agreement was in effect.

B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of California, or which is approved in writing by CITY, and shall be endorsed as follows. CONTRACTOR also agrees to require all contractors, and subcontractors to do likewise.

1. “The CITY, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the CONTRACTOR, including materials, parts, or equipment furnished in connection with such work or operations.”

2. This policy shall be considered primary insurance as respects CITY, its elected or appointed officers, officials, employees, agents, and volunteers.

Any insurance maintained by CITY, including any self-insured retention CITY may have, shall be considered excess insurance only and shall not contribute with this policy.

3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.

4. The insurer waives all rights of subrogation against CITY, its elected or appointed officers, officials, employees, or agents.

5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to CITY, its elected or appointed officers, officials, employees, agents, or volunteers.

6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days’ written notice has been received by CITY.

C. CONTRACTOR agrees to provide immediate notice to CITY of any claim or loss against Contractor arising out of the work performed under this agreement.

CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.

D. Any deductibles or self-insured retentions must be declared to and approved by CITY. At CITY’s option, CONTRACTOR shall demonstrate financial capability for payment of such deductibles or self-insured retentions.

E. CONTRACTOR shall provide certificates of insurance with original endorsements to CITY as evidence of the insurance coverage required herein.

Certificates of such insurance shall be filed with CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with CITY at all times during the term of this Agreement.

F. Failure on the part of CONTRACTOR to procure or maintain required insurance shall constitute a material breach of contract under which CITY may terminate this Agreement pursuant to Section 13 above.

G. The commercial general and automobile liability policies required by this Agreement shall allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and/or deductible of the policy in lieu of the CONTRACTOR (as the named insured) should CONTRACTOR fail to pay the SIR or deductible requirements. The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. CONTRACTOR understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONTRACTOR as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONTRACTOR’S behalf upon CONTRACTOR’S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against Contractor for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

21. USE OF OTHER CONTRACTORS. CONTRACTOR must obtain CITY’s prior written approval to use any Contractors while performing any portion of this Agreement. Such approval must include approval of the proposed Contractor and the terms of compensation.

22. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONTRACTOR of the final payment made under this Agreement shall operate as and be a release of CITY from all claims and liabilities for compensation to the CONTRACTOR for anything done, furnished or relating to the CONTRACTOR’S work or services. Acceptance of payment shall be any negotiation of CITY’S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by CITY shall not constitute, nor be deemed, a release of the responsibility and liability of CONTRACTOR, its employees, sub-Contractors and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by CITY for any defect or error in the work prepared by CONTRACTOR, its employees, sub-Contractors and agents.

23. CORRECTIONS. In addition to the above indemnification obligations, the CONTRACTOR shall correct, at its expense, all errors in the work which may be disclosed during CITY’S review of CONTRACTOR’S report or plans. Should the CONTRACTOR fail to make such correction in a reasonably timely manner, such correction shall be made by CITY, and the cost thereof shall be charged to CONTRACTOR. In addition to all other available remedies, CITY may deduct the cost of such correction from any retention amount held by CITY or may withhold payment otherwise owed CONTRACTOR under this Agreement up to the amount of the cost of correction.

24. NON-APPROPRIATION OF FUNDS. Payments to be made to CONTRACTOR by CITY for services preformed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONTRACTOR’S services beyond the current fiscal year, the Agreement shall cover payment for CONTRACTOR’S only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.

25. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

CITY CONTRACTOR
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
ATTN: City Manager
ATTN:

Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

26. SOLICITATION. CONTRACTOR maintains and warrants that it has not employed nor retained any company or person, other than CONTRACTOR’s bona fide employee, to solicit or secure this Agreement. Further, CONTRACTOR warrants that it has not paid nor has it agreed to pay any company or person, other than CONTRACTOR’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONTRACTOR breach or violate this warranty, CITY may rescind this Agreement without liability.

27. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONTRACTOR and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONTRACTOR’s or CITY’s obligations under this Agreement.

28. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.

29. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.

30. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

31. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY’s city administrator, or designee, may execute any such amendment on behalf of CITY.

32. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

33. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.

34. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.

35. ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.

36. STATEMENT OF EXPERIENCE. By executing this Agreement, CONTRACTOR represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY.

CONTRACTOR represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private Contractors, and experience in dealing with public agencies all suggest that CONTRACTOR is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.

37. DISCLOSURE REQUIRED. (CITY and CONTRACTOR initials required at one of the following paragraphs)
By their respective initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is a “contractor” for the purposes of the California Political Reform Act because CONTRACTOR’S duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a)(2) or otherwise serves in a staff capacity for which disclosure would otherwise be required were CONTRACTOR employed by CITY. CONTRACTOR hereby acknowledges his or her assumingoffice, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the CITY’S Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to Contractor commencing services hereunder, the City’s Manager shall prepare and deliver to CONTRACTOR a memorandum detailing the extent of CONTRACTOR’S disclosure obligations in accordance with the CITY’S Conflict of Interest Code.

City Initials
Contractor Initials
OR
By their initials next to this paragraph, CITY and CONTRACTOR hereby acknowledge that CONTRACTOR is not a “contractor” for the purpose of the California Political Reform Act because CONTRACTOR’S duties and responsibilities are not within the scope of the definition of contractor in Fair Political Practice Commission Regulation 18700.3(a)(2) and is otherwise not serving in staff capacity in accordance with CITY’S Conflict of Interest Code.

City Initials
Contractor Initials
[signatures on following page]
IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

CITY OF LOMITA CONTRACTOR
Ryan Smoot, City Manager By:

ATTEST:

Kathleen Horn Gregory, City Clerk Taxpayer ID No.

APPROVED AS TO FORM:

Trevor Rusin, City Attorney

P R O P O S A L F O R
MARCH 2023
New Roof Design for
Appian Way Pump Station

ENGINEERING SERVICES FOR
City of Lomita TETRA TECH

TABLE OF CONTENTS
Page

1. Cover Letter .............................................................................................................. 1

2. Qualifications and Experience
Project Organizational Chart ....................................................................................... 2 Principal Staff Members ............................................................................................. 3 Current Workload ....................................................................................................... 4 Experience on Similar Projects ................................................................................... 4

3. Scope of Work and Project Approach
QC/QA Procedures ..................................................................................................... 10 Project Schedule ......................................................................................................... 10 Document Control ....................................................................................................... 10

4. Fee Proposal
(Submitted separately)

Resumes of Key Personnel

Tetra Tech
160 E. Via Verde, Suite 240, San Dimas, CA 91773-5121
Tel 909.305.2930 www.tetratech.com
March 16, 2023
email: [email protected]
City of Lomita, Public Utilities Department
24300 Narboone Avenue
Lomita, CA 90717
Reference: Proposal for New Roof Design for Appian Way Pump Station Dear Mr. Sampat,
Our Tetra Tech team is excited at the opportunity to work with the City of Lomita on the New Roof Design for Appian Way Pump Station. We understand what a critical role this pump station plays in the overall City water system. Tetra Tech desires to be a partner with the City to upgrade this aging facility and increase overall system reliability. We have prepared a proposal in conformance with the requirements of the Request for Proposal dated February 23, 2023, and Addendum 1 dated March 10, 2023. Our team offers the City the following benefits:
 Design Team: We have assembled a team that has spent a large majority of their careers on water infrastructure projects. This is what they love to do! It starts with the Project Manager, Eric Yuen, P.E., S.E. with over 16 years of experience leading structural design projects. He will be supported with team members that he has been working with for over a decade. This includes Victor Ramirez, our Quality Lead (40+ years), Ken Berard, Mechanical Lead (30+ years) and Mazen Kassar, Electrical Lead (30+ years).  Anticipating the Issues: Members of our team bring a wide breath of design knowledge including decades of experience with structural design of water related structures. This means there is a very low learning curve and we use our experience and depth of resources to identify and address anticipated challenges early in the project. This means identifying challenges such as seismic resiliency, corrosion resistance, or material/Contractor availability and supply chain issues early and dealing with them directly with a plan of action. To assist the team with this we have included Victor Ramirez, SE on the team; he has more than 40 years of experience with these type of projects.
 Depth of Resources: Tetra Tech has 120 professionals in our Irvine office, offices and a total of 800 professionals in Southern California. With that in mind, Tetra Tech has the resources to deliver this project within the proposed schedule.

We are willing and ready to work with the City to see the New Roof Design for Appian Way Pump Station Project through to a successful completion. We trust that this proposal adequately conveys our wide range of experience and our excitement to be a part of City of Lomita’s team. We have reviewed the conditions listed in the “Request for Proposals” and have no exceptions.

Thank you for the opportunity to submit this statement of qualifications. Should you require additional information or have any questions, please feel free to contact me at 909.305.2951 or via email at [email protected].

Sincerely,
Eric Yuen, PE, SE
Project Manager
EY/MM:tth
M:\Marketing\Proposals\FY 2023\Lomita- NewRoofDesignAppianWay PS\3 Proposal\Draft\01-Coverltr.docx QUALIFICATIONS AND EXPERIENCE: Section 2 2 TETRA TECH
QUALIFICATIONS AND EXPERIENCE: Section 5

STAFF MEMBERS
Our structural design team includes our own
in-house staff of structural engineers, which
includes two California Registered
Structural Engineers, all with experience in
the water and wastewater pump station design,
both of these structural engineers will be
assigned to your project. Our team of engineers
is experienced in the design, detailing, seismic
analysis, retrofit, rehabilitation and
construction of reinforced CMU pump station
building. This experience will be valuable in
the roof replacement design for this project.

Tetra Tech may be perceived as a large
worldwide company, involved in the design of
large national and international projects. For
the most part, it is a collection of smaller
medium size companies methodically acquired
over the years through a careful and selective
vetting process, searching for technically sound companies with a longstanding relationship with local clientele, in the market areas of consulting engineering that the company has made a focused and strategic commitment to be engaged in. The work on this project will be performed by structural and civil engineering staff located in San Dimas. The staff in San Dimas has an extensive history of successful water infrastructure projects. The ability to successfully evaluate, plan, design and rehabilitate existing municipal water infrastructure is a niche area of structural engineering expertise, which involves knowledge and experience beyond that required for the design of new buildings.

PROJECT TEAM
Tetra Tech’s strength lies in the qualifications of
our project team, the individual team member’s
commitment of our firm, and our knowledge of
pump station and roof replacement design.

These strengths will allow us to respond to the
City’s requirements of this project. Our project
team is made up of structural engineering design
professionals whose specialty is structural
engineering of water related structures.

Tetra Tech’s structural engineering team includes professionals with proven experience, who have delivered many similar pump station roof replacement projects with unparalleled technical excellence. Our team members have demonstrated their ability to resolve complex issues and produce cost-effective planning as well as design documents for pump station facilities throughout California. More specifically, QUALIFICATIONS AND EXPERIENCE: Section 2 3 TETRA TECH
each team member has an established record of successful accomplishments in the engineering discipline of his expertise, and we are confident to delivery these projects efficiently and successfully. All of our engineering and design services will be performed by our own in-house staff of experts, as depicted on the Team Chart.

PROJECT TEAM ORGANIZATION AND RESPONSIBILITIES
The successful execution of a roof replacement project involves many challenges. Experienced staff will be assigned to your project from start to finish, ensuring that valid information is developed, and sensitive issues are resolved. All phases of the project will require thoroughness and attention to detail to make certain that the project goes smoothly, and the City gets first-class final deliverables.

EXPERIENCE OF THE PRINCIPAL STAFF MEMBERS
Project Manager/ Structural Design Lead – The stewardship of Eric Yuen, P.E., S.E. will be the driving force behind the proposed Tetra Tech Team. He will be a focal point for communications between the City and members of the Project Team to ensure that project needs are clearly spelled out and understood. As Project Manager, Mr. Yuen will be responsible for achieving the City’s stated goals, assessing viable alternatives considered, and ensuring compliance with project intent, completeness of the final deliverables, conformance to the project schedule, and satisfaction of the City. Mr. Yuen has over 16 years of structural engineering design experience, with special emphasis in designing and rehabilitation of water related infrastructures including new pump station, existing pump station expansion and rehabilitation.

QA/QC Manager –Victor Ramirez, P.E., S.E. – Mr. Ramirez has over 40 years of design experience in water related infrastructures, all with Tetra Tech. He has been involved in the design of over 40 pump stations with varies configurations and roof type.

Mechanical/HVAC Design Lead –Ken Berard, PE. – Mr. Berard has over 30 years of design experience in sewers, reservoirs, pump stations, wells, pipelines, chlorination facilities, and pressure reducing facilities.

He has been involved in the design of over 30 pump stations Electrical Design Lead –Mazen Kassar, PE. – Mr. Kassar heads the electrical division of Tetra Tech’s Southwest Water/Wastewater Group located in Southern California. Mr. Kassar has more than 30 years of experience in electrical engineering and industry standard that include electrical engineering staff management, project management, construction management and supervision, water and wastewater treatment, petro-chemical design, and environmental soil and groundwater treatment. His background includes designing medium and low voltage power distribution, designing instrumentation, control systems and SCADA systems for a wide-variety of projects, and the installation of electrical systems for remediation projects, including soil vapor extraction systems and groundwater pump-and-treat systems.

CURRENT WORKLOAD
Staff Current Workload Availability for this Project
Eric Yuen, SE
Structural Project Manager 8 20%
Jose Quiroz, PE
Structural Project Engineer 4 40%
Ken Berard, PE
Mechanical/HVAC Manager 5 10%
Mazen Kassar, PE
Electrical Manager 4 10%
Once we receive notice to proceed, the project will be incorporated into our current workload schedule to maintain the milestones and deliverables to the city within the designated schedule.

QUALIFICATIONS AND EXPERIENCE: Section 2 4 TETRA TECH

EXPERIENCE ON SIMILAR PROJECTS
Client Contact Projects
City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
Andrew Ferrigno, PE
714-536-5291
[email protected]
Well 9 Building Roof Replacement*
Inland Empire Utilities Agency
6075 Kimball Avenue
Chino, California 91708
James Spears, PE
909.993.1851
[email protected]
IERCF Damage Roof Assessment and
Retrofit*
Montecito Water District
583 San Ysidro Road
Santa Barbara, CA 93108
Adam Kanold, PE
805-456-9802
[email protected]
Toro Canyon Reservoir Roof Replacement*
Water Replenishment District of
Southern California
4040 Paramount Blvd.

Lakewood, CA 90712
Charlene King
562-275-4252
[email protected]
WRD HQ Re-Roofing Design
SDCWA
4677 Overland Ave.

San Diego, CA 92123
Octavio Casavantes
858-522-6839
[email protected]
Roofing Kearny Mesa HQ Bldg. - Structural
Engineering Design
Arcadis/IEUA
445 South Figueroa Street, #
3650
Los Angeles, CA 90071
Harmik Aghanian, PE
[email protected] IERCF Roof Damage Rehabilitation OCWD
18700 Ward Street
Fountain Valley, CA 92728
Ryan Bouley
714-378-8207
[email protected]
Santiago Pump Station Modifications
IRWD
15600 Sand Canyon Avenue
Irvine, CA 92618
Jacob Moeder
949-453-5554
[email protected]
Fleming Reservoir and Pump Station Design
Suburban Water System
1325 N. Grand Avenue, Suite
100
Covina, CA 91724
Jorge Lopez
626-543-2554
Plant 408 Reservoir and Pump Station
Design
*The following pages give detailed information of projects we have done that are similar in scope.

Well No. 9 Building Roof Replacement
City of Huntington Beach, California
Tetra Tech Project No. 200-09383-22001-05

The wood roof of City’s Well No. 10 building burned down a few years ago, and it is of similar construction as the Well No. 9 building. As a result, the City wants to modify the Well 9 building to help mitigate the risk of fire hazards. Tetra Tech prepared plans and specifications for the Well 9 roof replacement. The structural scope is to replace the existing wood roof system with a new lightweight concrete fill composite metal deck system. The new roof deck will be supported by a new steel roof framing structure and the existing CMU walls. The new roof will provide fire protection and sound attenuation. The Well No. 9 building was constructed in the 1980s, and it is about 40 years old. The existing CMU walls are checked to confirm their adequacy to resist the additional loading steel roof system. In addition to the roof replacement, Tetra Tech also redesigned the HVAC system to improve the ventilation in the Well 9 building. The lighting system will be taken down during the new roof construction and will be reinstalled after the construction is completed. Tetra Tech’s scope also includes the bid and construction phase support services.

Client/Owner:

City of Huntington Beach
Engineering Fee:
$139,795
Project Duration:
2023 – Current
Project Staff:

Eric Yuen, P.E./S.E. –
Project Manager
Jose Quiroz, P.E. –
Structural Design Engineer
Ken Berard, P.E. –
HVAC Design Lead
Mazen Kassar, P.E. –
Electrical Design Lead
Reference:

City of Huntington Beach
Utilities
2000 Main Street
Huntington Beach, CA
92648
Andrew Ferrigno P.E
Principal Civil Engineer
Phone: 714.536.5291
Email:
[email protected]
IERCF Damage Roof Assessment and Retrofit
Rancho Cucamonga, California
Tetra Tech Project No. 200-52469-20002 Page 1
IEUA had noticed an abnormal deflection and excessive water ponding in their Inland Empire Regional Composting Facility (IERCF) roof. Tetra Tech performed an onsite visual inspection of the roof structure and found that a glulam beam girder was damaged. Tetra Tech then provided the retrofit design to repair the damaged girder. All the findings, recommendations, and retrofit details were summarized in a Technical Memorandum submitted to IEUA.

The IERCF is located in Rancho Cucamonga, California. The building was originally constructed in 1984 and served as a warehouse building for twenty years before being converted into a composting facility in 2004. The roof structure is a panelized system composed of plywood sheathing and wood 2x subpurlins that span in the east-west direction between the wood truss purlins. The purlins span in the north-south direction to wood glulam beams. These glulam beams span in the east-west direction supported by steel columns. The steel columns are encased in concrete along the bottom to protect them from equipment. The repurposing of the building required multiple upgrades throughout the years that have added additional loads to the existing roof system.

These additions include a suspended ceiling system at the interior under the roof and roof fan louvers on the roof in 2004 and a photovoltaic system on top of the roof in 2008 and 2018, which is likely the cause of the damaged roof member.

Client/Owner:

Inland Empire Utilities
Agency
Engineering Fee:
$25,222
Project Duration:
2020
Project Staff:

Eric Yuen, P.E./S.E. –
Project Manager
Jose Quiroz, P.E. –
Structural Design Engineer
Reference:

Inland Empire Utilities
Agency
6075 Kimball Avenue
Chino, California 91708
James Spears, PE
Senior Engineer
Phone: 909.993.1851
Email: [email protected]
Toro Canyon Reservoir Roof Replacement
Montecito/Santa Barbara, California
Tetra Tech Project No. 135-0106490-16001 Page 1
Tetra Tech prepared a “Structural and Seismic Evaluation of Montecito Water Districts Storage Reservoirs in 2015. Based on that report Tetra Tach identified several seismic, life-safety, piping and site security risks. Montecito Water District is addressing some of the life-safety concerns noted in the 2015 Report, namely the replacement of the existing roof structure of the Toro Canyon Reservoir.

Tetra Tech prepared plans and specifications for a new cover for the Toro Canyon Reservoir. Tetra Tech prepared a Comprehensive Structural and Seismic Evaluation Engineering Report that identified several seismic, life-safety, piping and site security risks. The roof replacement will facilitate access to the reservoir and provide safer working conditions for future work on this site.

Client/Owner:

Montecito Water District
Engineering Fee:
$48,668 vs. $53,168
Number of Change
Orders:

Change Order No.01:
$ 4,500 (client based –
Additional Design scope to
lower roof)
Project Duration:
2016 – 2017
Project Staff:

Victor Ramirez, P.E./S.E –
Project Manager
Eric Yuen, P.E./S.E. –
Project Engineer
Reference:

Montecito Water District
583 San Ysidro Road
Santa Barbara, CA 93108
Arnold Kanold, P.E.

Engineering Manager
Phone: 805.969.2271
Email:
[email protected]
om
SCOPE OF WORK: Section 3 8 TETRA TECH
SCOPE OF WORK AND PROJECT APPROACH: Section 3

PROJECT UNDERSTANDING AND APPROACH
We understated that the City is concerned about the potential termite damage to the existing wood roof of the Appian Way Pumping Plant and Pressure Reducing Station and wants to replace it with a roof system that is resistant to termites (steel roof system will be used). The new roof should provide a minimum of 30 years of life span and should attenuate the operating noise and vibration from the interior of the pump station while insulating heat from the outside during the summer season (rigid insulation will in used). In addition, the existing skylight and roof exhaust fan are to be replaced. The new skylights should be centered at the pumps below to allow for pump removal and replacement. Since both the existing roof exhaust fan and the roof will be replaced, we will take this opportunity to see if upsizing the exhaust fan will help improve the ventilation inside the pump station. We also understand that the pump station facility will need to remind in operation throughout the construction and the operation crews will need to have continuous access to the electrical panel area. Furthermore, all the equipment within the building will need to be protected, and no chemical application will be allowed within the building during the construction.

Tetra Tech’s forty-plus years of experience have led to many opportunities for design refinements and many lessons learned. The design of our water facilities structures has evolved in the choices of materials, detailing, layouts, etc. The design evolutions have led to structures with improved seismic resiliency, corrosion resistance, better functionality, security and noise reduction. Our design improvements have also led to safer facilities for O&M staff, by improving fire safety/combustibility, roof access and fall protection, where applicable. The lessons we have learned over the last four decades yield facilities that are constructed with extreme ease. This helps to control construction costs and shorten construction schedules. The structural design of the new roof will adhere to the 2021 California Building Code (CBC) and the applicable codes and standards that are referenced by the 2021 CBC. These codes and standards include the ASCE 7-16 Minimum Design Loads for Buildings and Other Structures and AISC Manual of Steel Construction (15th Edition). All applicable loads, including loads caused by seismic and wind forces, will be considered in our design.

SCOPE OF WORK
Task 1 – General Project Administration & Meetings
 Conduct a kick-off meeting with Lomita staff to discuss the scope of the project, develop a work plan to accomplish the project goals, schedule, and identify future constraints.  Conduct two design review meetings with Lomita staff to review the City’s comments after the milestone submittal.
 Prepare agendas for all meetings and submit them to the City two (2) working days prior to the meeting for review, and submit meeting minutes within five (5) working days of the meeting.  Submit monthly progress reports with each invoice. Progress reports shall contain work performed, project concerns and impacts, and the work anticipated for the next month. Invoices shall detail the team member, hours worked, task and date of hours worked.

Task 2 – Data Research and Investigation
 Review existing records and research the availability of other records.  Conduct site investigations at the Appian Way Pump Station to assess the condition of the building to confirm the accuracy of the as-built drawings and whether it is adequate to support the new roof.

SCOPE OF WORK: Section 3 9 TETRA TECH
 It appears that the Appian Way Pump Station is located within the Lomita City limit, and it should be under the City’s jurisdiction. We assumed that the City’s building department will review the roof replacement project submittals. Permitting from other agencies such as the Los Angeles County Building Department, Los Angeles County Fire Department, and the State Division of Drinking Water, etc. is not required for the design and construction. In addition, we assume the pump station is classified as a group F-2 (Low- Hazard Factory Industrial) building where it does not need to comply with the California Building Energy Efficiency Standards - Title 24.

Deliverables
 No report will be provided for this task.

Task 3 – Plans, Specifications and Estimate (PS&E)
 Structural Analysis and Calculations
 Structural Drawings (9 sheets)
i. Cover Sheet
ii. General Structural Notes
iii. Special Inspections and Structural Observations
iv. Demolition Plan
v. Roof Framing Plan
vi. Building Section
vii. Structural Standard Details
viii. Building Roof Detail 1
ix. Building Roof Detail 2
x. HVAC Plan and Section
xi. Electrical Notes
xii. Power Plan
 Technical Specifications
i. In CSI Format
ii. We assume that the front-end specifications will be provided by the City iii. Division 5: Metal Deck, Structural Steel and Miscellaneous Metals iv. Division 7: Roofing, Sealants and Adhesives
v. Division 8: Skylight
vi. Division 16: Electrical
vii. Division 23: Exhaust Fan
 Engineer’s Estimate
Prepare a preliminary engineer’s estimate of the probable construction cost for this project. (AACE Class 3 at 60% and AACE Class 1 at 100%)
Deliverables
 Submit 60% PS & E
 Submit 100% PS & E
 One (1) digital pdf copy, one (1) native file copy, and two (2) hard copies of the plans for each submittal
SCOPE OF WORK: Section 3 10 TETRA TECH
Task 4 – Bid Packages
 Submit a bid package including the California PE or SE signed and stamped plans, specifications and any other documents necessary to release for bids
Task 5 – Bid and Construction Support
 Provide professional support during the bidding process and construction activities.  Attend Pre-bid meeting
 Provide answers and information to bid questions or inquiries and prepare the bid addenda as required (Assumed 1 set of questions total)
 Attend Pre-construction meeting
 Review construction submittals (Assumed 8 total)
 Respond to Request for Information (Assumed 6 total)
 Assist in cost estimate and analysis for Contract Change Order (CCO) (Assumed 1 total)  Perform Structural Observations (Assumed 4 total)
 Complete As-built drawings based on actual construction

QA/QC PROCEDURES
Tetra Tech has a long history of providing high-quality products and services to several public agencies in Southern California. The quality of our work is measured by the high level of satisfaction of our clients and construction change orders below industry standards. Tetra Tech’s two-level QA/QC reviews will ensure the high quality of the deliverables that we present to the City. The first level of review is performed by the project manager to guarantee that the intent of the structural design concept is properly executed, and this takes place throughout the design process. The second level of QA/QC review is performed by the QA/QC Manager who provides an independent technical review for all deliverables prior to each submittal. Our QA/QC process starts at the conceptual level, to make sure the project starts well and stays on track.

PROJECT SCHEDULE
Notice to Proceed (NTP) April 2023
Site Reconnaissance 2 Weeks after NTP
Submit 60% Submittal 8 Weeks after NTP
Receive 60% Submittal City’s Review comments 10 Weeks after NTP Submit 100% Submittal 14 Weeks after NTP
Receive 100% Submittal City’s Review comments 15 Weeks after NTP Submit Bid Package Submittal 16 Weeks after NTP

DOCUMENT CONTROL
Document control is the management of documents and the ability of engineers to make changes to them.

At Tetra Tech, calculations and drawings are given a simple R1, R2, R3, etc. to the file name when they are reviewed and revised. Once the deliverables have been completed, the Project Manager and QA-QC Manager must review them before they are sent to the City.

CITY COUNCIL ADMINISTRATION

BARRY WAITE RYAN SMOOT

BILL UPHOFF CITY MANAGER

JAMES GAZELEY

CINDY SEGAWA

MARK WARONEK

CITY OF LOMITA
CITY HALL OFFICES • 24300 NARBONNE AVENUE, LOMITA • CALIFORNIA 90717 (310) 325-7110 • FAX (310) 325-4024 • www.lomitacity.com

DEPARTMENT OF PUBLIC WORKS

NEW GROUNDWATER WELL FEASIBILITY STUDYROOF DESIGN FOR

APPIAN WAY PUMP STATION
ADDENDUM No. 1
DATE: March 10, 2023
TO: ALL PROSPECTIVE PROPOSERSARTICIPANTS
SUBJECT: CLARIFICATIONS TO THE REQUEST FOR PROPOSAL
Please note the following changes and/ or additions to the Request for Proposal (RFP) for the project indicated above. The bidder shall execute the certification at the end of this addendum and shall attach the executed addendum to the documents submitted with the bidproposal.

QUESTIONS
The following are responses to questions received from prospective bidders.

Questions 1: With the new roof system, the skylights and exhaust fan will be replaced in kind.

How about the lighting inside the PS building? Will they be removed, stored, and reinstalled, or will they be replaced in kind?
Response to Question 1: Note the old skylights, lighting, and exhaust fan will shall be removed, and replaced new skylights, lighting and exhaust fan placed in the same locations.

The design will need to incorporate these elements.

Please sign the attached acknowledgement of receipt of Addendum and enclose include the original copy with the proposal submittalof the Project Manager at [email protected].

Sincerely,
Sam Sampat
Senior Civil Engineer
CITY HALL OFFICES • 24300 NARBONNE AVENUE, LOMITA • CALIFORNIA 90717 (310) 325-7110 • FAX (310) 325-4024 • www.lomita.com/cityhall

ACKNOWLEDGEMENT OF ADDENDUM

NEW GROUNDWATER WELL FEASIBILITY STUDYROOF DESIGN FOR

APPIAN WAY PUMP STATION
Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your proposal. Failure to do so may result in disqualification of your firm’s proposal.

The undersigned acknowledges receipt of Addendum No. 1 dated January 11March 10, 2023
ATTEST: _____________________________________
Principal: _____________________________________
Address: ____________________________________
By: _____________________________________
Title: _____________________________________
160 E. Via Verde Suite 240, San Dimas, CA 91773
Eric Yuen, SE
Project Manager
Man Hong (Eric) Yuen, PE, SE
Project Manager
Yuen, Page 1
Mr. Yuen has more than 16 years of experience in the design, analysis, and detailing of structure with special emphasis in the design of water storage/water containment and water conveyance related structures, including reservoirs, water/wastewater treatment plants, booster pump stations, flow control facilities, pressure reducing stations and pipelines. He is knowledgeable in all types of construction including reinforced concrete, masonry, structural steel and wood frame design. He also has extensive experience with seismic evaluation, assessment and retrofit of existing structures.

EXPERIENCE
City of Huntington Beach - Well 9 Roof Replacement, Huntington Beach, CA – Structural Engineer responsible for the preparation of plans and specifications for the Well 9 Roof project. Tetra Tech will design a replacement for the wood roof with a composite metal deck supported by a steel roof framing structure and improve the ventilation to the Well 9 building.
(Arcadis) IERCF Existing Roof Analysis, IEUA, 2019-2020 – Project Manager to provide engineering consulting services to perform a structural evaluation of the damaged sections of a roof at the Inland Empire Regional Compost Facility (IERCF) for the Inland Empire Utilities Agency (IEUA).

Seismic Resiliency of 8 Reservoirs, Montecito Water District, Montecito, CA 2021- Present – Structural Project Engineer assisting with the design analysis and final design documents for the retrofits of four concrete reservoirs including Bella Vista reservoir, Cold Spring reservoir, Hot Springs reservoir, Buena Vista reservoir. Tetra Tech prepared Structural and Seismic Evaluation Report for ten of the District Storage Reservoirs back in September 2015, and the District selected Tetra Tech to prepare the final design document for the retrofit and provide construction support for eight of their reservoirs. The retrofit methods include reinforced concrete wall and footing overlay strengthening, steel roof seismic strengthening, roof to wall seismic connection strengthening, roof system replacement, and complete reservoir replacement.

City of Riverside: Condition Assessment and Seismic Evaluation of the Emtman, University Heights, and Ross Reservoir, 2021 Project Manager responsible to perform a baseline condition assessment and seismic evaluation for three existing reservoirs: Emtman (5MG, 1960s), University Heights (5MG 1930s), and Ross Reservoirs (2MG, 1970s), and prepare the Preliminary Design Report (PDR) to summarize the findings and provide recommendations, budgetary estimates for tank retrofit and/or repair options a “Hazard Categorization & Prioritization Matrix” to help the City to prioritize the necessary rehabilitations when funding becomes available. These three reservoirs are completely buried conventional reinforced concrete reservoirs (two rectangular and one circular).

J.B Latham Wastewater Treatment Plant Digester 4 Rehabilitation Project, South Orange County Water Authority (SOCWA), Dana Point, CA. 2018 The South Orange County Wastewater Authority (SOCWA) retained Tetra Tech to provide design engineering services for various site and mechanical improvements at the JB Latham and 3A Regional Wastewater Treatment Plants. The JB Latham wastewater treatment plant upgrades included:• A standby raw sewage pump station • Replacement of a 42-inch sluice gate and actuator • Removal and replacement of an existing bar screen • Addition of a primary screenings washing compacting system. Tetra Tech also provided engineering services during construction of the upgrades to the wastewater treatment plants, completed in August 2005.

Carlsbad Desalination Intake Pump Station – Design of a 300 MGD Dilution Pump Station, Phase 1, Kiewit Shea Desalination, Carlsbad, CA. 2019-Ongoing. Structural Design Engineer. This design-build project provides for the design and construction of brine dilution pumps at the existing Carlsbad Desalination Plant (CDP) with minimal production shutdown. The project consists of hydraulic pump modeling and design of dilution pumps, discharge piping, brine piping, and flowmeter facilities, NRG forebay modifications including new screen backwash pumps and tunnel bulkheads, a new electrical building, and the associated civil and grading work. The project has extensive structural rehabilitation work and a new floating dock in the lagoon. The project provides instrumentation and controls for the operation of the new facility and will tie in new signals to the existing CDP control system.

Education:

M.S., Civil and Structural
Engineering, California State
Polytechnic University, Pomona
2016
BS, Civil Engineering, California
State Polytechnic University,
2007
Registrations/Certifications:

Professional Engineer:

California, No. 75983, 2009
Montana, No.63246, 2020
Colorado, No. 56159, 2019
Prof. Structural Engineer:

California, No. 6177, 2014
Oregon, No. 94532, 2019
Cal OES Safety Assessment
Program Evaluator Training
Fall Protection (Ladders,
Scaffolding, Aerial Lifts),
10/2022
H2
S Protection Training
Respiratory Protection Training
Confined Space Training,
10/2022
Professional Affiliations:

American Institute of Steel
Construction
Office Location:

San Dimas, CA
Total Years of Experience:
(2007) 16
Years with Tetra Tech:
(03/2007) 16
Victor Ramirez, PE, SE
QA/QC Manager
Mr. Ramirez has over 40 years of structural engineering design experience with special emphasis in the design of water storage/water containment and water conveyance related structures, including reservoirs, water/wastewater treatment plants, booster pump stations, flow control facilities, pressure reducing stations and pipelines.

His experience also includes the design of a wide variety of other types of structures, including buildings, bridges and storm drainage related structures. He is thoroughly knowledgeable in all types of construction, including reinforced concrete, masonry, structural steel, and timber.

EXPERIENCE
Albert Robles Center for Water Recycling and Environmental Learning (Groundwater Reliability Improvement Program (GRIP) Advanced Water Treatment Facility), Water Replenishment District of Southern California, Pico Rivera, CA. 2016-2019. Lead Structural Engineer. Lead Structural Engineer for a new 13,000 acre-feet per year of fully advanced treated recycled water. Treatment process includes influent facilities, microfiltration/ultrafiltration, reverse osmosis, ultraviolet advanced oxidation process, post-treatment/stabilization/disinfection, product water wet well, and brine/waste disposal connection. The structures include a two-story administration building with a rooftop garden, a 45,000 square foot process building, a 3 million gallon buried concrete equalization tank, and a dozen ancillary structures.

The administration building has a rigid floor and roof diaphragms as concentric steel braced frames as the lateral force resisting elements. The process building has a steel framed roof and concrete masonry shear walls. An extensive network of cable trays and piping are supported from the roof for gravity and seismic loads.

Conveyance Pipeline for Carlsbad 50.0 MGD Seawater Desalination Plant, Poseidon Resources Corporation, Carlsbad, CA. 2013. Structural Engineer.

Structural Engineer for the design of two piping and control buildings and four buried concrete vaults, six structures associated with the interconnection of the new 54-inch diameter Carlsbad Conveyance Pipeline with the existing SDCWA P3 and P4 pipelines. The six structures are buried reinforced concrete vaults that consist of two pump wells, two isolation valve vaults, an interconnect valve vault, and a flow control facility. The flow control facility vault has an above-grade concrete masonry control room with a steel framed roof built on top of it. The buildings are concrete masonry structures with steel framed roofs.

Export Sludge Design/Build Project, South Orange County Water Authority (SOCWA), Laguna Niguel, CA. 2013.

Structural Project Engineer. This project is one of many Design/Build undertakings where Tetra Tech teamed with Pascal & Ludwig Constructors. It consists of three main structures: the sludge equalization tank, the pump station and the electrical building. The sludge equalization tank is a 40-foot diameter, 26-foot-deep, conventionally reinforced cylindrical tank whose design conforms to ACI 350. The sludge equalization tank has an aluminum stair to allow the District’s maintenance and operations staff to access the equipment mounted on the roof of the tank. The pump station is an open concrete enclosure, surrounded on three sides by 4-foot-high concrete walls. The design of these walls included provisions for a future masonry building which will be the permanent enclosure for the pump station. The electrical building is a masonry building with a steel framed roof. The design of this project also included guardrails and lighting to improve the safety of the District’s personnel. In addition to structural design, this project included construction support services (responses to contractor’s requests for information, review of shop drawings and on-site structural observations).

Seismic Evaluations of Warehouse Buildings 309, 506 & 507, U.S. Naval Base, Port Hueneme, CA. 2008. Structural Project Engineer. Oversaw the seismic and wind lateral force evaluations on three existing warehouse facilities at this U.S.

Naval facility. They included the following:
 Building 309: 128,384 SF single story warehouse “box-system” building constructed in 1942 with a wood frame truss roof, wood frame exterior walls and CIP concrete fire/area separation walls  Building 507: 23,325 SF single story warehouse “box-system” building constructed in 1948 with a wood frame trussed roof and wood frame walls
Education:

BS, Civil Engineering, California
State University,
Los Angeles, 1995
Registrations/Certifications:

Registered Structural Engineer,
California, No. 4720, 2004
Nevada, No. 24180, 2016
Texas, No. 127770, 2017
Registered Civil Engineer
California, No. 56863, 1997
Washington, No. 54086, 2016
Professional Affiliations:

Structural Engineers Association
of Southern California
American Institute of Steel
Construction
Field Safety Certifications
Confined Space
Fall Protection (Ladders,
Scaffolding, Aerial Lifts)
3/2018
Office Location:

San Dimas, CA
Total Years of Experience:
(06/1981) 43
Years with Tetra Tech:
(06/1981) 43
Jose Quiroz, PE
Structural Design Engineer
Quiroz Page 1
Mr. Quiroz has experience in the design, analysis and detailing in structural engineering. He is knowledgeable in the evaluation, condition assessment and seismic retrofit of existing reservoir structures. He is also skilled in the design of reinforced concrete, masonry, structural steel and wood frame design, and construction for a variety of building and infrastructure projects including reservoirs, water/wastewater treatment facilities.

EXPERIENCE
City of Riverside: Condition Assessment and Seismic Evaluation of the Emtman, University Heights, and Ross Reservoir, 2021. Structural design engineer assisted with performing a baseline condition assessment and seismic evaluation for three existing reservoirs: Emtman (5MG, 1960s), University Heights (5MG 1930s), and Ross Reservoirs (2MG, 1970s), and prepare the Preliminary Design Report (PDR) to summarize the findings and provide recommendations, budgetary estimates for tank retrofit and/or repair options a “Hazard Categorization & Prioritization Matrix” to help the City to prioritize the necessary rehabilitations when funding becomes available.

These three reservoirs are completely buried conventional reinforced concrete reservoirs (two rectangular and one circular). All three reservoirs have a concrete flat roof system supported by concrete columns.

Seismic Resiliency of 8 Reservoirs, Montecito Water District, Montecito, CA 2021- Present – Structural design engineer assisting with the design analysis and final design documents for the retrofits of four concrete reservoirs including Bella Vista reservoir, Cold Spring reservoir, Hot Springs reservoir, Buena Vista reservoir. Tetra Tech prepared Structural and Seismic Evaluation Report for ten of the District Storage Reservoirs back in September 2015, and the District selected Tetra Tech to prepare the final design document for the retrofit and provide construction support for eight of their reservoirs. The retrofit methods include reinforced concrete wall and footing overlay strengthening, steel roof seismic strengthening, roof to wall seismic connection strengthening, roof system replacement, and complete reservoir replacement.

Groundwater Reliability Improvement Program (GRIP) Advanced Water Treatment Facility, Water Replenishment District of Southern California, Pico Rivera, CA. 2016-2019. Structural Engineer for a new 13,000 acrefeet per year of fully advanced treated recycled water. The structures include a two-story administration building with a rooftop garden, a 45,000 square foot process building, a 3 MG buried concrete equalization tank, and a dozen ancillary structures. The administration building has rigid floor and roof diaphragms with concentric steel braced frames as the lateral force resisting elements. The process building has a steel framed roof and concrete masonry shear walls. An extensive network of cable trays and piping are supported from the roof for gravity and seismic loads. The equalization tank is a buried, rectangular concrete structure designed in accordance with ACI 350. The ancillary structures are a combination of reinforced concrete, steel, and masonry construction.

Clearview Reservoir Assessment, Golden State Water Company, Santa Ana, CA. 2019. Structural design engineer assisting with the engineering visual assessment and seismic evaluation for the two partially buried concrete reservoirs (one rectangular and one circular) at the Clearview site located at 1501 Clearview Ln. Santa Ana. The circular reservoir has a capacity of 124,000 gallons and the rectangular reservoir has a capacity of 84,000 gallons. Not destructive Ground Penetration Radar (GPR) was performed during the onsite assessment to location the existing wall and roof slab reinforcement for the circular reservoir.

MF Filtrate Tank Assessment at the Leo J. Vander Lans Advanced Water Treatment Facility, Water Replenishment District of Southern California, Long Beach, CA. 2018 – 2019. Structural design engineer assisting with the condition assessment and seismic evaluation of an existing 35,000-gallon welded steel tank at the Leo J. Vander Lans Advanced Water Treatment Facility. Work included the preparation of a technical memo that described our evaluation, findings, seismic analysis, and repair recommendations, and cost estimates for the repairs.

Clearview Reservoir Assessment, Golden State Water Company, Santa Ana, CA 2019 – Structural Designer assisting with the visual assessment and seismic evaluation for the two concrete reservoirs at the Clearview site located at 1501 Clearview Ln. Santa Ana.

Education:

MS Structural Engineering
California State Polytechnic,
Pomona, CA
12/2017
BS Civil Engineering
California State University, Los
Angeles
06/2013
Registrations/Certifications:

Professional Engineer:

California No. 91482, 4/2020
Field Safety Certifications
Fall Protection (Ladders,
Scaffolding, Aerial Lifts)
10/2022
H2
S Protection Training
Respiratory Protection Training
Confined Space Training
10/2022
Professional Affiliations:

American Society of Civil
Engineers
Office Location:

San Dimas, CA
Total Years of Experience:
(2017) 6
Years with Tetra Tech:
(01/2017)6
Kenneth R. Berard, P.E.

Senior Project Manager

Page 1 ends

Mr. Berard has extensive experience in many facets of water/wastewater engineering. Mr. Berard has performed numerous studies ranging from complete water master plans to efficiency studies. His design experience includes preparing bid documents for sewers, reservoirs, pump stations, wells, pipelines, chlorination facilities, and pressure reducing facilities. Mr. Berard also has extensive experience in hydraulic modeling. He has used and is familiar with more than six software packages in addition to open channel flow software.

Rounding out Mr. Berard's experience is work he has done in inspection, construction administration, shop drawing review, and plan checking.

EXPERIENCE
Rosecrans Booster Station Replacement, City of Buena Park, Buena Park, CA 2016- Provided peer review of project technical memos and bid document submittals. The technical memos included a water demand analysis of the City’s ‘Upper Zone’, pump station conceptual design report, a well siting study, and final design scope of services. The project bid document review included three reviews of the 51 sheet drawings and specifications. The booster station included 5 vertical turbine booster pumps in cans, surge tank, and chlorine generation. The pump station housing enclosure included an electrical room, pump room, disinfection room, and generator room.

Water Reclamation Plant No. 10 Secondary Effluent Pump Station, Coachella Valley Water District, Palm Desert, CA. 2016. Project Manager for design of a secondary effluent pump station, including approximately 8,800 linear feet of piping for the suction and discharge lines and all piping appurtenances. This 21 mgd capacity pump station pumps secondary effluent from the existing SE ponds on site, and discharges either to percolation ponds for settling/ground recharge, or back to the headworks and aeration basins to aid in operation during low incoming flow periods. The pump station includes six VFD-controlled vertical turbine pumps in a wet well, including a motor operated sluice gate and traveling screen at the entrance. There are three 7 mgd pumps and a 3 mgd jockey pump to handle the range of flows to the percolation basins. There are two 5 mgd pumps that discharge to the headworks/aeration basins. Power and controls are in a separate electrical building along with a 1,250 kW emergency generator. The suction and discharge piping range from 8- to 30-inches, at depths of more than 25 feet, and include a large flow diversion vault and several smaller vaults housing motor operated isolation valves and flow meters. Other upgrades at the site include overflow and inlet structures at the percolation ponds, conversion of the existing pump station into a storage facility, and new sliding gates at the flocculators and tertiary filters. All related electrical and structural design was also coordinated.

Suburban Water Systems, Plant 224 Facility Improvements, Whittier, CA. 2014. Project Manager for the design and construction assistance for the plant improvements. A conceptual plan was developed to construct a 13,000 gpm pump station and as much potable water storage as practical at Suburban Water System’s 224 Plant.

The concept required close coordination with the City of Whittier in order to obtain DRA, CUP, and Building Department permits. A detailed report was developed and presented to the Public Utility Commission in order to justify the project and obtain funding.

Two conventionally reinforced partially buried reservoirs store 2.4 MG and 4.7 MG of potable water. In order to meet the City of Whittier’s development requirements, an Art Deco architectural style was adopted which included a 30-foot high façade in the front of the site and architectural pilasters and cornices on the exposed reservoir and pump station walls. The façade includes a 5.5-foot diameter clock and bronzed letters identifying the owner. The architectural theme is compatible with a historical pump station building at an adjacent site.

Project Role:

Project Manager
Education:

B.S., Civil Engineering,
California State Polytechnic
University, Pomona, 1986
Registrations/Certifications:

Professional Civil Engineer,
California, No. 45499, 1992
Professional Affiliations:

American Water Works
Association
Inland County Water
Association
Office:

San Dimas, CA
Years of Experience:
33 Years with Tetra Tech:
33 Mazen Kassar, PE
Electrical Manager
Kassar, Page 1
Mr. Kassar has more than 30 years of experience in electrical engineering and industry standard that include electrical engineering staff management, project management, construction management and supervision, water and wastewater treatment, petrochemical design, and environmental soil and groundwater treatment. His background includes designing medium and low voltage power distribution, designing instrumentation, control systems and SCADA systems for a wide-variety of projects, and the installation of electrical systems for remediation projects, including soil vapor extraction systems and groundwater pump-and-treat systems. Other experience includes, working with utility companies to provide new electrical service to new projects, working with local Building and Safety Departments to obtain Plan Check and construction permits, field trouble shooting of electrical and mechanical systems, system commissioning and startup, problem solving, and managing an operation and maintenance department. He has strong knowledge in MS Office and AutoCAD.

EXPERIENCE
City of Santa Monica Equipping of Three Wells, Santa Monica, CA. 2018- Ongoing. Electrical Engineering Manager. Tetra Tech is providing preliminary and final design, permitting, bidding, and construction services for three municipal drinking water wells, ranging from 300 to 800 gpm. This project consists of two potable water extraction wells and one water injection/extraction well. All three wells are located within the large, grassy median of Olympic Boulevard at separate sites in the city of Santa Monica.

Fleming Zone 8 Reservoir and Zones 8 to 9 Pump Station, Irvine Ranch Water District, CA. 2019-Ongoing. Electrical Engineer. Tetra Tech provided final design and construction support services for Irvine Ranch Water District. The project consisted of a 1.3-million-gallon prestressed concrete reservoir, pump station building with three 670 gpm pumps, a Reservoir Management System, surge tank, and piping. Tetra Tech provided construction phasing to maintain service to the existing reservoir and pump station during construction.

Carlsbad Desalination Intake Pump Station – Design of a 300 MGD Dilution Pump Station, Phase 1, Kiewit Shea Desalination, Carlsbad, CA. 2019-Ongoing.

Electrical Engineer. This design-build project provides for the design and construction of brine dilution pumps at the existing Carlsbad Desalination Plant (CDP) with minimal production shutdown. The project consists of hydraulic pump modeling and design of dilution pumps, discharge piping, brine piping, and flowmeter facilities, NRG forebay modifications including new screen backwash pumps and tunnel bulkheads, a new electrical building, and the associated civil and grading work. The project has extensive structural rehabilitation work and a new floating dock in the lagoon.

Fleming Zone 8 Reservoir and Zones 8 to 9 Pump Station, Irvine Ranch Water District, CA. 2019-Ongoing. Electrical Engineer. Tetra Tech provided final design and construction support services for Irvine Ranch Water District. The project consisted of a 1.3-million-gallon prestressed concrete reservoir, pump station building with three 670 gpm pumps, a Reservoir Management System, surge tank, and piping. Tetra Tech provided construction phasing to maintain service to the existing reservoir and pump station during construction.

Bolivar Park Stormwater and Runoff Capture Project, City of Lakewood, Lakewood, CA. 2015 – 2018. Electrical Engineer. Mr. Kassar was responsible for providing electrical engineering design services in support of preparation of final plans, specifications and estimates. Tetra Tech was contracted to evaluate the potential site location and develop this stormwater runoff and capture project. The project consists of an air-inflated rubber dam diversion system to re-direct all urban runoff and stormwater runoff from the Del Amo channel through a pre-treatment system to remove trash, debris, and sediment. A pump station and drainage pipeline will convey the water into a large, buried multi-chambered storage/infiltration facility.

Education:

BS, Electrical Engineering,
California State University, Long
Beach, 1990
Registrations/Certifications:

Professional Electrical Engineer,
California, No. 15809, 1998
General Construction, Class B
No. 777845, California, 2008
Contractor - C-10 Electrical,
California Class C – Specialty,
No. 777845, 2000
ETAP Electrical Power
Modeling, 2010
Project Management I & II, 2012
Auto CAD, 2005
GE and Allen Bradley PLC
programming, 2004
GE/Intellution and Wonderware
SCADA programming,1998
Vapor e\extraction and
Groundwater Treatment, 1991
OSHA 8-hour Hazardous Waste
Operations Annual Refresher
Training, 2016
OSHA 8-hour Hazardous Waste
Operations Site Supervisor
Training,1992
OSHA 40-hour Hazardous
Waste Operations Training,
1989
Professional Affiliations:

Institute of Electrical and
Electronics Engineers IEEE
Office Location:

Irvine, CA
Total Years of Experience:
(1992) 31
Years with Tetra Tech:
(2009) 14

Price Summary / Totals
Task Pricing Totals 86,395
Bill Rate > 270.00 225.00 135.00 120.00 140.00 105.00 270.00 150.00 270.00 120.00 Specify Add'l Fees on Setup 0 Technology Use Fee
Proj Area > Structural Structural Structural Structural Structural Structural HVAC HVAC Electrical Electrical 86,395 Submitted to: City of Lomita
Contract Type: T&M
Project Phases / Tasks 553 6 71 130 106 98 12 19 44 22 45 0.00%               ‐ 85,915                     ‐ 480                          ‐ 86,395 1 2 3 4 5 6 8 9 12 13
Task 1 ‐ General Project Admin and Meetings                      ‐ 22 11                 ‐ 3                 ‐                 ‐ 8                 ‐                 ‐                 ‐                    ‐ 3,720                             ‐                             ‐                             ‐ 3,720 Kick‐Off Meeting 2 1 1 360 360
Design Review Meeting (2 Total) 4 2 2 720 720General Admin and Invoicing 8 4 4 1,320 1,320Monthly Progress Report 8 4 4 1,320 1,320 Task 2 Data Research and Investigation                      ‐ 33 2 8                 ‐ 8                 ‐ 6 2 6 1                    ‐ 6,150                       ‐ 240                             ‐ 6,390 Review Existing Document 8 1 1 2 1 1 1 1 1,410 1,410
Site Investigations 20 6 6 4 4 3,690 240 3,930Permitting Requirements Research Report 5 1 1 1 1 1 1,050 1,050 Task 3 PS&E 331 6 23 51 78 80 2 9 33 12 37                  ‐ 49,510                             ‐                             ‐                             ‐ 49,510 Design Calculations 34 1 8 20 1 4 4,575 4,575
Drawings                       ‐ 191 9 23 40                 ‐ 70 2 18 5 24                     ‐ 27,200                                ‐                                ‐                                ‐ 27,200 Structural                            ‐ 142 9 23 40                    ‐ 70                        ‐                        ‐                        ‐                        ‐                           ‐ 19,730                                      ‐                                      ‐                                      ‐ 19,730 Cover Sheet 4 1 1 2 640 640General Notes 4 1 1 2 640 640Special Inspections 4 1 1 2 640 640Demolition Plan 21 1 4 8 8 2,845 2,845Roof Framing Plan 25 1 4 8 12 3,405 3,405Building Section 15 1 2 4 8 2,095 2,095Structural Standard Details 11 1 2 4 4 1,535 1,535Building Roof Details 1 29 1 4 8 16 3,965 3,965Building Roof Details 2 29 1 4 8 16 3,965 3,965 Mechanical                               ‐ 20                        ‐                        ‐                        ‐                        ‐                        ‐ 2                    ‐ 18                        ‐                             ‐ 3,240                                      ‐                                      ‐                                      ‐ 3,240 HVAC Plan & Section 20 2 18 3,240 3,240
Electrical                               ‐ 29                        ‐                        ‐                        ‐                        ‐                        ‐                        ‐                        ‐ 5 24                             ‐ 4,230                                      ‐                                      ‐                                      ‐ 4,230 Electrical Abbr. and Symbols 9 1 8 1,230 1,230Power Plan 20 4 16 3,000 3,000 Specifications 37 2 8 10 2 1 6 2 6 5,370 5,370Cost Estimate 16 2 6 1 2 1 4 2,580 2,580Internal QA‐QC 16 6 6 2 2 4,050 4,050Address City and Building Department's Comments 37 3 6 8 10 2 3 2 3 5,735 5,735 Task 4 Bid Packages                      ‐ 22 4 4 2 4 2 1 2 1 2                    ‐ 3,530                             ‐                             ‐                             ‐ 3,530 Prepare Bid Package 22 4 4 2 4 2 1 2 1 2 3,530 3,530
Task 5 Bid and Construction Support                    ‐ 145 31 64 18              ‐ 14 3 7 3 5                  ‐ 23,005                       ‐ 240                             ‐ 23,245 Pre‐Bid Meeting 6 6 1,350 1,350
Bid Assistance (Assumed 1 Set of Bid questions) 8 2 4 1 1 1,530 1,530Pre‐Construction Meeting 6 6 1,350 1,350Review Shop Drawings (Assumed 8) 40 6 16 10 1 4 1 2 6,090 6,090Respond to RFIs (Assumed 6) 20 4 10 1 2 1 2 3,330 3,330Contract Change Orders (Assumed 1) 22 2 4 8 8 3,070 3,070Structural Observations (Assumed 4) 32 4 28 4,680 240 4,920Record Drawings 11 1 2 6 1 1 1,605 1,605 Totals 553 6 71 130 106 98 12 19 44 22 45 0.00%               ‐ 85,915                     ‐ 480                          ‐ 86,395 Task Pricing
Totals
Total
Labor Hrs Subs Travel Mat'ls & Equip ODCs
Labor
Civil Rate Esc. LaborProject Engineer
(Adrian Lee)
Elec Project Manager
(Mazen Kassar)
Elec Engineer2 (James
Structural
Roberts)
Designer
(Jose Quiroz)
Engineer2 (Miguel
Magpantay)
CADD (Eric Hutchins)
Structural Admin
(Tammy Huang)
Civil Project Manager
(Ken Berard)
Total Price
Pricing by Resource
QA‐QC Manager (Victor
Ramirez)
Project Manager (Eric
Yuen)
10 Resource
New Roof Design for Appian Way
Price Proposal Labor Plan
Tetra Tech - Confidential and Proprietary Page 1 of 1 Printed 4/3/2023

← All documents from this meeting