Cindy Segawa, Mayor
Barry Waite, Mayor Pro Tem
James Gazeley Councilmember
Bill Uphoff, Councilmember
Mark A. Waronek, Councilmember

LOMITA CITY HALL

COUNCIL CHAMBERS
24300 Narbonne Avenue
Lomita, CA 90717
Phone: (310) 325-7110
Fax: (310) 325-4024
Next Resolution No. 2026-52
Next Ordinance No. 902
AGENDA

REGULAR MEETING

LOMITA CITY COUNCIL
TUESDAY, OCTOBER 20, 2026
6:00 PM
In-Person Participation
Members of the public who wish to speak are requested to complete a speaker card and submit it to the City Clerk prior to the consideration of the item. Speaker cards are available at the entrance to the Council Chamber.

Remote Participation (Zoom Webinar)
Members of the public may observe and participate in the meeting remotely by joining Zoom Webinar using the meeting link or dial-in information provided below. https://us02web.zoom.us/j/81565553581?pwd=iLx4RjacZZngBr2yvVIig78eO6ZVPr.1 Webinar ID: 815 6555 3581 Passcode: 192195
Join by Phone: (669) 900 6833
To provide live comment, click the “Raise Hand” feature in Zoom (or press *9 if participating by phone) when the mayor announces the public comment period. When recognized, speakers will be unmuted and should state their name for the record before beginning their comments.

Public Comment Procedures
General Public Comment: Public comments on Consent Agenda Items or matters not listed on the agenda will be heard during Oral Communications.

Agenda Items: Public comment will be invited at the time each agenda item is considered.

Order of Speakers: Speakers participating in person and remotely will be called in the order requests are received.

Time Limits
Public comments are limited to three (3) minutes per speaker. A timer will be used to monitor each speaker’s allotted time.

Tuesday, October 20, 2026, Reg CC Mtg. Page 1
Lomita City Council Meeting Agenda October 20, 2026

Page 2 of 5 ends

Accessibility and Accommodations
In compliance with the Americans with Disabilities Act, if you require a disability-related modification or accommodation to participate in this meeting, please contact the City Clerk’s Office at least 48 hours in advance at 310-325-7110.

Technical Issues
If a disruption occurs that prevents public participation via Zoom, the City may recess the meeting until service is restored or take other actions consistent with applicable law.

City Council Meetings are streamed online at https://lomitacity.com/agendas-minutes/ No meeting of the Lomita Public Financing Authority will be held on this date.

1. OPENING CEREMONIES
a. Call Meeting to Order
b. Flag Salute
c. Invocation – Mayor Pro Tem Waite
d. Roll Call

2. APPROVAL OF AGENDA

3. PRESENTATIONS

CERTIFICATES OF RECOGNITION PRESENTED TO THE HALLOWEEN HOME

DECORATING CONTEST WINNERS

4. ORAL COMMUNICATIONS
Persons wishing to speak on Consent Agenda items or subjects other than those scheduled are requested to do so at this time. In order to conduct a timely meeting, a three (3) minute time limit per person has been established. Government Code Section 54954.2 prohibits the Council from discussing or taking action on a specific item unless it appears on a posted agenda.

5. ORAL COMMUNICATIONS AND MEETING ATTENDANCE REPORTS FROM THE CITY

COUNCIL
The City Council may discuss and act upon items described under Council comments; however, items which are not on the agenda will be limited to Council reports, announcements, requests for clarification or factual information, or placement of matters on the agenda for a future meeting.

6. CITY MANAGER'S REPORT (information only)

7. CONSENT AGENDA
All items under the Consent Agenda are considered by the Council to be routine and will be enacted by one motion in the form listed below. There may be separate discussions of these Tuesday, October 20, 2026, Reg CC Mtg. Page 2
Lomita City Council Meeting Agenda October 20, 2026

Page 3 of 5 ends

items prior to the time the Council votes on the motion. Specific items may be removed from the Consent Agenda at the request of any Councilmember or staff.

RECOMMENDED ACTION: That Consent Agenda Items 7a-7f be approved. a. Motion to Waive Full Reading of Ordinances and That They be Read in Title Only.

RECOMMENDED ACTION: Approve motion.
b. Minutes of the Regular City Council Meeting of August 18, 2026 RECOMMENDED ACTION: Approve minutes.
c. Warrants/Payroll Register
RECOMMENDED ACTION: Approve and file Warrants/Payroll Register. d. September 2026 Treasury and Investment Report
RECOMMENDED ACTION: Receive and file the Treasury and Investment Report. e. Second Reading of Ordinance No. 901 Amending the Construction and Demolition Waste Management Chapter
RECOMMENDED ACTION: Adopt Ordinance No. 901 and find the action to be categorically exempt from the California Environmental Quality Act.

ORDINANCE NO. 901 – AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, AMENDING CHAPTER 5 (CONSTRUCTION AND

DEMOLITION WASTE MANAGEMENT) OF TITLE V (SANITATION AND HEALTH) OF

THE LOMITA MUNICIPAL CODE TO ESTABLISH A CONSTRUCTION AND

DEMOLITION HAULING PERMIT AND A DEPOSIT FOR NON-CITY-FRANCHISED

WASTE HAULERS, AND FINDING THE ACTION IS NOT SUBJECT TO THE

CALIFORNIA ENVIRONMENTAL QUALITY ACT
f. Fiscal Year 2025/2026 Year-End Budget Amendments
RECOMMENDED ACTION: Approve the FY 25-26 Year-End Budget Amendments as proposed and direct staff to make necessary expenditure and revenue budget amendments to implement the recommendations.
g. Reaffirming Resolution No. 2026-50 Authorizing Procurement Under California Public Contract Government Code Section 22050(c)(1)
RECOMMENDED ACTION: Adopt Resolution No. 2026-52 to reaffirm the adoption of Resolution No. 2026-50 on October 6, 2026, authorizing the immediate emergency repair of the mixer at the Cypress Reservoir and finding an emergency exists requiring immediate action to repair; direct the City Clerk to confirm the same in the minutes of this City Council meeting, via Minute Order, reflecting this action.

RESOLUTION NO. 2026-52 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF LOMITA, CALIFORNIA, DETERMINING A NEED TO CONTINUE ACTION PURSUANT TO PUBLIC CONTRACT CODE SECTION 22050 FOR REPAIR OF THE

MIXER AT THE CYPRESS RESERVOIR
Tuesday, October 20, 2026, Reg CC Mtg. Page 3
Lomita City Council Meeting Agenda October 20, 2026

Page 4 of 5 ends

8. SCHEDULED ITEMS
a. AGREEMENT WITH KIMLEY HORN AND ASSOCIATES FOR COMMUNITY

OUTREACH AND GRANT SERVICES FOR THE LOMITA SPORTS AND COMMUNITY

CENTER PROJECT
Presented by Emma Kelley, Parks and Recreation Director RECOMMENDED ACTION: Approve a Professional Services Agreement with Kimley Horn and Associates for Outreach and Grant Services for the Lomita Sports and Community Center Project (formerly “Navy Fields”) for $199,938, plus a contingency amount of $20,000 for unexpected costs, for a total not to exceed $219,938; and authorize the City Manager to execute the agreement.
b. CITY HALL 2ND FLOOR REMODEL UPDATE AND SECOND AMENDMENT WITH

ACTON ARCHITECTURE FOR ARCHITECTURAL DESIGN SERVICES
Presented by Deanna Fraley, Public Works Director
RECOMMENDED ACTION: Approve Amendment No. 2 to the Agreement with Acton Architecture, Inc. for the City Hall 2nd Floor Remodel Project adding electrical system evaluation and design services in the amount of $59,432, for a revised cumulative total contract amount not to exceed $356,480; and, authorize staff to proceed with final design and preparation of construction documents.
c. FIRST AMENDMENT TO AGREEMENT NO. 2026-54 WITH LOCAL AGENCY ENGINEERING ASSOCIATES, INC. FOR ON-CALL CONSTRUCTION

MANAGEMENT AND CONSTRUCTION INSPECTION SERVICES AND TASK ORDER

APPROVAL
Presented by Deanna Fraley, Public Works Director
RECOMMENDED ACTION: Approve the First Amendment to Agreement No. 2026-54 with Local Agency Engineering Associates, Inc. (LAE) for On-Call Construction Management and Construction Inspection Services (CMCI) authorizing a one-time exceedance to the $200,000 individual task order limit for Task Order No. 1 and Task Order No. 2 associated with the Zone G projects, plus a contingency of 15% for unexpected work, for a total contract amount not to exceed $569,825.30; approve Task Order 1 for the Zone G Water Main Replacement Project; approve Task Order 2 for the Street Reconstruction Project – Zone G Phases 3 and 4; and, authorize the City Manager to execute the First Amendment and associated task orders.

9. PUBLIC HEARINGS
a. ZONING TEXT AMENDMENT NO. 2026-05 – A CODE UPDATE RELATED TO

RESIDENTIAL CARPORTS
Presented by Adrian Fernandez, Community and Economic Development Director RECOMMENDED ACTION: Introduction of an ordinance approving Zoning Text Amendment No. 2026-05 to amend Section 11-1.30.04(E) (Carports) of Lomita Municipal Code (LMC) Title XI (Planning and Zoning) Chapter 1 (Zoning) and find the action to be categorically exempt from the California Environmental Quality Act (CEQA).

Tuesday, October 20, 2026, Reg CC Mtg. Page 4
Lomita City Council Meeting Agenda October 20, 2026

Page 5 of 5 ends

ORDINANCE NO. 902 – AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, APPROVING ZONING TEXT AMENDMENT NO. 2026-05 TO AMEND SECTION 11-1.15.02 OF LOMITA MUNICIPAL CODE TITLE XI (PLANNING AND ZONING) CHAPTER 1 (ZONING) AND LOMITA MUNICIPAL CODE TITLE XI (PLANNING AND ZONING) CHAPTER 2 (DIVISION OF LAND), AND FINDING THE

ACTION TO BE CATEGORICALLY EXEMPT FROM THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT

10. ADJOURNMENT
The next regular City Council meeting will be held on November 3, 2026, at 6:00 p.m. in the Council Chambers located at 24300 Narbonne Avenue, Lomita, California.

Written materials distributed to the City Council within 72 hours of the City Council meeting are available for public inspection via the City’s website and copies are available for public inspection in the City Clerk’s Office, 24300 Narbonne Avenue, Lomita.

I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted not less than 72 hours prior to the meeting at the following locations: Lomita City Hall, Lomita Park, and uploaded to the City of Lomita website https://lomitacity.com/agendasminutes.

Date Posted: October 16, 2026
_______________________________
Kathleen Horn Gregory, MMC, City Clerk
Tuesday, October 20, 2026, Reg CC Mtg. Page 5

Page 1 of 10 ends

MINUTES OF THE

LOMITA CITY COUNCIL

REGULAR MEETING
TUESDAY, AUGUST 18, 2026

1. OPENING CEREMONIES
a. Call Meeting to Order
The regular meeting of the Lomita City Council was called to order by Mayor Segawa at 6:05 p.m. on Tuesday, August 18, 2026, in the Council Chambers at Lomita City Hall, 24300 Narbonne Avenue, Lomita, California.
b. Flag Salute
Councilmember Gazeley led the flag salute.
c. Invocation
Mayor Pro Tem Waite gave the invocation.
d. Roll Call
PRESENT: Councilmembers Gazeley, Uphoff, Waronek, Mayor Pro Tem Waite, and Mayor Segawa

ABSENT: None

STAFF PRESENT: City Manager Vialpando, Assistant City Attorney Castillo (arrived at 6:47 p.m.), Assistant City Manager Hernandez, Deputy City Manager/Administrative Services Director Kamada, Public Works Director Fraley, Community and Economic Development Director Fernandez, Parks and Recreation Director Kelley, and City Clerk Gregory
e. Closed Session Report
Assistant City Attorney Rodier Potter (via Zoom) stated that all five City Councilmembers met at 5:30 p.m. in open session then recessed to closed session to discuss the item on the closed session agenda:

CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Pursuant to Government Code section 54956.8
Property: Lomita Ballfields at Defense Fuel Supply Point Naval Weapons Station Seal Beach located at 26800 S. Western Ave, Lomita, CA 90717 Agency negotiator: Andrew Vialpando, City Manager
Negotiating parties: United States of America, acting by and through the Department of the Navy
Under negotiation: Price and Terms of Payment for Purchase Assistant City Attorney Rodier Potter stated that no reportable action was taken.

Tuesday, October 20, 2026 Reg CC MTG, Page *6
City Council Regular Meeting Minutes
August 18, 2026

Page 2 of 10 ends

2. APPROVAL OF AGENDA
Councilmember Uphoff made a motion, seconded by Councilmember Gazeley, to approve the agenda.

MOTION CARRIED by the following vote:

AYES: Councilmembers Gazeley, Uphoff, Waronek, Mayor Pro Tem Waite, and Mayor Segawa
NOES: None
ABSENT: None

3. PRESENTATIONS
There were no presentations scheduled.

4. ORAL COMMUNICATIONS
Mayor Segawa announced the time for oral communications.

Don Smith, Lomita resident, suggested a deterrent to speeding on Eshelman Avenue, commented on an informal poll he conducted, and spoke about the repair of an underground water leak on his street.

George Kivett, Lomita resident, reported a hazard on Stanhurst Avenue, and commented on curbs recently installed on his street.

Becca Komathy, Lomita Library Children’s Librarian, announced upcoming programs and events.

As there were no further requests to speak, Mayor Segawa closed oral communications.

5. ORAL COMMUNICATIONS AND MEETING ATTENDANCE REPORTS FROM THE CITY

COUNCIL
Councilmember Gazeley had nothing to report.

Councilmember Waronek reported on the following:
• August 4 – National Night Out
• August 5 – California Contract Cities Association (CCCA) Executive Board Meeting • August 7 – Joint Powers Insurance Authority Meeting
• August 12 – Liability Trust Fund Meeting
• August 18 – Southern California Association of Governments (SCAG) Legislative Committee Meeting
• He announced the 12th Annual Spaghetti Fundraiser Dinner for Lomita Sheriff’s and Fire Stations on September 25 at Lomita-Harbor City Kiwanis Hall Councilmember Uphoff reported on the following:
• August 4 – National Night Out
• August 6 – CCCA Budget and Audit Committee Meeting
• August 6 – Cal Cities L.A. County Division Installation Dinner Tuesday, October 20, 2026 Reg CC MTG, Page *7
City Council Regular Meeting Minutes
August 18, 2026

Page 3 of 10 ends

• August 10 – South Bay Cities Council of Governments (SBCCOG) Transportation Committee Meeting
• August 10 – SBCCOG Steering Committee Meeting
• August 12 – CCCA Legislative Committee Meeting
• August 18 – L.A. County Library Benchmark Committee Meeting Mayor Pro Tem Waite reported on the following:
• July 22 – Lomita Chamber of Commerce Event at Still Got It Fitness • July 23 – Regional Water Quality Control Board Meeting • July 24 – L.A. County CEO’s Office Meeting
• July 28 – Dinner for the Visiting Sister City Delegates at the Lomita-Harbor City Kiwanis Club
• July 28 – Lomita Park Playground Ribbon Cutting
• August 4 – Red Car Trolley Ad Hoc Meeting
• August 4 – National Night Out
• August 6 – Cal Cities L.A. County Division Installation Dinner • August 12 – South Bay Economic Roundtable
• August 14 – Local Governmental Services Commission Meeting Mayor Segawa reported on the following:
• August 4 – National Night Out
• August 6 – Farewell Dinner for Visiting Sister City Delegates

6. CITY MANAGER'S REPORT (information only)
City Manager Vialpando stated that National Night Out showcased the City’s investment in its Community Safety Division. He announced the final Summer Movie Under the Stars will take place on August 15, and the final Summer Concert on August 21.

7. CONSENT AGENDA
RECOMMENDED ACTION: That Consent Agenda Items 7a-7h be approved.

Councilmember Gazeley made a motion, seconded by Councilmember Uphoff, to approve the recommended action.

MOTION CARRIED by the following vote:

AYES: Councilmembers Gazeley, Uphoff, Waronek, Mayor Pro Tem Waite, and Mayor Segawa
NOES: None
ABSENT: None
a. Motion to Waive Full Reading of Ordinances and That They be Read in Title Only.

RECOMMENDED ACTION: Approve motion.
b. Minutes of the Regular City Council Meeting of June 16, 2026 RECOMMENDED ACTION: Approve minutes.
c. Warrants/Payroll Register
Tuesday, October 20, 2026 Reg CC MTG, Page *8
City Council Regular Meeting Minutes
August 18, 2026

Page 4 of 10 ends

RECOMMENDED ACTION: Approve and file Warrants/Payroll Register. d. July 2026 Treasury and Investment Report
RECOMMENDED ACTION: Receive and file the Treasury and Investment Report. e. Professional Services Agreements for On-Call Construction Management and Construction Inspection Services
RECOMMENDED ACTION: Approve Professional Services Agreements between the City of Lomita and LAE Associates, Inc., Berg & Associates, Inc., Sunbeam Solar Technologies Inc., and Z & K Consultants, Inc. for On-Call Construction Management and Construction Inspection Services for three-year terms, with the option to extend for two additional oneyear terms, in an amount not to exceed $500,000 over three years for each agreement; and authorize the City Manager to execute the agreements.
f. Memorandum of Agreement for the Coordinated Integrated Monitoring Program and Watershed Management Program for the Dominguez Channel Watershed Management Area
RECOMMENDED ACTION: Approve the Memorandum of Agreement (MOA) between the City of Lomita and the Cities of Los Angeles, Carson, Segundo, Hawthorne, Inglewood, Lawndale, the Los Angeles County Flood Control District, the County of Los Angeles, and the South Bay Cities Council of Governments (collectively “Dominguez Channel Watershed Management Area”) regarding the administration and cost sharing for implementing the Coordinated Integrated Monitoring Program (CIMP) and Watershed Management Program (WMP) for the Dominguez Channel Watershed Management Area; authorize the Mayor to sign the MOA; authorize Lomita’s estimated share of the funding, $505,720 over five years; and appropriate $103,493 for Lomita‘s FY 26-27 share of the funding. g. Notice of Completion for the Lomita Park Playground Equipment and Rubberized Surface Removal and Replacement Project
RECOMMENDED ACTION: Approve the Notice of Completion accepting the work performed by Micon Construction, Inc. for the Lomita Playground Equipment and Rubberized Surface Removal and Replacement Project; authorize the City Clerk to file the notice of Completion (NOC) with the Los Angeles County Recorder’s Office; and authorize the Public Works Director to sign the NOC and release the 5% retention payment to Micon Construction, Inc. 35 calendar days after recordation of the NOC by the Los Angeles County Recorder’s Office, contingent upon no claims being filed on the project. h. Notice of Completion for the Street Reconstruction Project Zone G – Phase 2 RECOMMENDED ACTION: Approve the Notice of Completion (NOC) accepting the work performed by Hardy & Harper, Inc., for the Street Reconstruction Project Zone G – Phase 2; authorize the City Clerk to file the NOC with the Los Angeles County Recorder’s Office and if no claims are filed within 35 calendar days after recordation, send a notice to the surety company to exonerate the Performance Bond; and authorize the Public Works Director to sign the NOC and release the 5% retention payment in the amount of $94,135.54 to Hardy & Harper, Inc., 35 calendar days after recordation of the NOC, contingent upon no claims being filed on the project, and the contractor providing an acceptable warranty bond with the City.

Tuesday, October 20, 2026 Reg CC MTG, Page *9
City Council Regular Meeting Minutes
August 18, 2026

Page 5 of 10 ends

8. SCHEDULED ITEMS
a. RESOLUTION APPOINTING CANDIDATES FOR DISTRICTS 1, 3, AND 5 CITY

COUNCIL SEATS AND CANCELING THE GENERAL MUNICIPAL ELECTION FOR SCHEDULED FOR NOVEMBER 3, 2026
RECOMMENDED ACTION: Adopt a Resolution appointing Mark A. Waronek as member of the City Council for District 1, Cindy Segawa as member of the City Council for District 3, Jon Harry Bayouth as member of the City Council for District 5, each for four-year terms ending in 2030; cancel the General Municipal Election scheduled for November 3, 2026; direct the City Clerk to present Certificates of Appointment In Lieu of Election to the appointees; and direct the City Clerk to swear the appointees into office, with terms officially beginning after the November 3, 2026, General Municipal Election.

City Manager Vialpando presented the staff report per the agenda material. As each of the three qualified candidates were unopposed, appointing them to the City Council and cancelling the General Municipal Election on November 3, 2026 will save the City approximately $40,000.

As there were no questions for staff, Mayor Segawa invited public comment.

George Kivett, Lomita resident, spoke in support of the item.

Jon Bayouth, City Councilmember-elect, thanked residents for the opportunity to serve.

Councilmember Gazeley made a motion, seconded by Councilmember Uphoff, to approve the recommended action.

MOTION CARRIED by the following vote:

AYES: Councilmembers Gazeley, Uphoff, Waronek, Mayor Pro Tem Waite, and Mayor Segawa
NOES: None
ABSENT: None
Adopted the following titled resolution:

RESOLUTION NO. 2026-45 – A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF LOMITA, CALIFORNIA, PROVIDING FOR APPOINTMENT TO THE OFFICE OF MEMBER OF THE CITY COUNCIL THAT WAS TO BE ELECTED ON NOVEMBER 5, 2024, FOR DISTRICTS 1, 3, AND 5; AND CANCELING THE ELECTION b. LOMITA SHERIFF’S STATION QUARTERLY CRIME REPORT (NO STAFF REPORT) RECOMMENDED ACTION: Information only.

Captain Guerrero presented the report for April-June 2026. She outlined traffic crimes, traffic overview, traffic enforcement trend, Part I crimes, five-year crime trend, part II crime and arrest activity, response time performance, operational highlights, community engagement framework, looking ahead, CORE team highlights, and detective bureau operations. She responded to questions from the City Council.

Tuesday, October 20, 2026 Reg CC MTG, Page *10
City Council Regular Meeting Minutes
August 18, 2026

Page 6 of 10 ends

CORE Deputy Sanchez spoke about personal responsibility regarding e-bikes safety, the Sheriff’s Department’s preference for community engagement over enforcement, the upcoming e-bike rodeo, and using drones instead of vehicles in pursuits. He responded to City Council questions.

Mayor Segawa invited public comment.

George Kivett, Lomita resident, spoke in support of enforcement efforts in the City, and for e-bikes for patrol deputies.

It was the consensus of the City Council to receive and file the report. c. AUTHORIZATION TO PROCEED WITH PARTIAL CONSTRUCTION OF THE

WATERFRONT RED TROLLEY CAR (RED CAR) EXHIBIT AT THE LOMITA RAILROAD MUSEUM POCKET PARK AND APPROPRIATE $71,500 FROM THE GENERAL FUND

AVAILABLE BALANCE
RECOMMENDED ACTION: Authorize staff to proceed with partial construction (Option 2) of the Waterfront Red Trolley Car exhibit site at the Lomita Railroad Museum Annex Pocket Park following full execution of the MOU between the City of Lomita and the City of Los Angeles Harbor Department; and, appropriate $71,500 from the General Fund available balance in the FY 2026-27 Adopted Budget.

City Manager Vialpando presented the staff report per the agenda material. He outlined previous recent updates, the previous approved location at Irene Lewis Railroad Park, the new site location at the Annex Park across the street from the previous approved location, the MOU with the Port of Los Angeles, latest developments, updated project cost estimates, and fiscal impact.

Brief City Council discussion took place regarding the grant from the Harbor Department, the project as an investment in the community, and whether this is the best use of City funds.

As there was no further discussion, Mayor Segawa invited public comment.

George Kivett, Lomita resident, spoke in support of the project.

As there were no further requests from the public to speak on this item, Mayor Segawa brought the item back for further discussion or a motion.

Brief City Council discussion took place regarding commencing construction only after full execution of the MOU.

As there was no further discussion, Mayor Segawa invited a motion.

Councilmember Uphoff made a motion, seconded by Mayor Pro Tem Waite, to approve the recommended action.

MOTION CARRIED by the following vote:

AYES: Councilmembers Uphoff, Waronek, and Mayor Pro Tem Waite NOES: Councilmember Gazeley and Mayor Segawa
ABSENT: None
Tuesday, October 20, 2026 Reg CC MTG, Page *11
City Council Regular Meeting Minutes
August 18, 2026

Page 7 of 10 ends

d. CAL CITIES (FORMERLY LEAGUE OF CALIFORNIA CITIES) RESOLUTION TO BE

CONSIDERED BY THE GENERAL ASSEMBLY AT ITS ANNUAL CONFERENCE RECOMMENDED ACTION: Determine the City’s position on the Cal Cities Resolution being considered by the Cal Cities General Assembly at its Annual Conference meeting; Confirm and restate Mayor Pro Tem Waite as the City’s Cal Cities Voting Delegate; and Appoint an Alternate Voting Delegate.

Assistant City Manager Hernandez presented the staff report per the agenda material.

She outlined the background, the proposed resolution from the City of Murrietta, policy considerations, and designating a voting delegate and alternate.

Brief City Council discussion took place regarding the public’s opposition to higher housing density, and the lack of required onsite parking for many new units.

As there was no further discussion, Mayor Segawa invited public comment. As there were no requests from the public to speak on this item, Mayor Segawa invited a motion.

Councilmember Waronek made a motion, seconded by Councilmember Gazeley, to support the Cal Cities (City of Murrieta) resolution, and to reappoint Mayor Pro Tem Waite as delegate and to appoint Councilmember Uphoff as alternate.

MOTION CARRIED by the following vote:

AYES: Councilmembers Gazeley, Uphoff, Waronek, Mayor Pro Tem Waite, and Mayor Segawa
NOES: None
ABSENT: None

9. PUBLIC HEARINGS
a. ORDINANCE AMENDING THE LOMITA MUNICIPAL CODE TO PROHIBIT USE OF

POTABLE WATER IN NONFUNCTIONAL TURF AREAS IN COMPLIANCE WITH STATE REQUIREMENTS (ASSEMBLY BILL 1572)
RECOMMENDED ACTION: After conducting a public hearing and after the City Attorney reads the Ordinance by title only, introduce on first reading an ordinance amending and adding sections to the Lomita Municipal Code related to water conservation and prohibiting the use of potable water for the irrigation of nonfunctional turf, waive further reading, and schedule the ordinance for second reading and adoption at a subsequent City Council meeting.

Recreation Coordinator Heaney presented the staff report per the agenda material. He outlined the background, the three affected locations in the City, project costs and grant funding, California Friendly Landscape examples, and fiscal impact.

Brief City Council discussion took place regarding whether any City trees would be removed as a result of this amendment.

Mayor Pro Tem Waite left the dais and the City Council Chambers at 7:50 p.m. He returned at 7:52 p.m.

Tuesday, October 20, 2026 Reg CC MTG, Page *12
City Council Regular Meeting Minutes
August 18, 2026

Page 8 of 10 ends

As there was no further discussion, Mayor Segawa opened the public hearing at 7:56 p.m. As there were no requests from the public to speak on this item, Mayor Segawa closed the public hearing at 7:56 p.m. and invited a motion.

Assistant City Attorney Castillo read the title of the ordinance to be introduced.

Councilmember Uphoff made a motion, seconded by Councilmember Waronek, to approve the recommended action.

MOTION CARRIED by the following vote:

AYES: Councilmembers Uphoff, Waronek, Mayor Pro Tem Waite, and Mayor Segawa NOES: Councilmember Gazeley
ABSENT: None
Introduced the following titled ordinance:

ORDINANCE NO. 898 – AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, ADDING PART 3 TO TITLE XII, CHAPTER 4 OF THE LOMITA

MUNICIPAL CODE RELATING TO WATER CONSERVATION AND PROHIBITING

THE USE OF POTABLE WATER FOR THE IRRIGATION OF NONFUNCTIONAL TURF

AND FINDING THE ACTION TO BE CATEGORICALLY EXEMPT FROM THE

CALIFORNIA ENVIRONMENTALLY QUALITY ACT
b. ORDINANCE AMENDING TITLE II, CHAPTER II OF THE LOMITA MUNICIPAL CODE

UPDATING ACTIVITIES AND CONDITIONS RELATED TO PARKS AND

RECREATION FACILITIES
RECOMMENDED ACTION: After conducting a public hearing and after the City Attorney reads the Ordinance by title only, introduce on first reading an Ordinance to amend and add sections to the Lomita Municipal Code related to prohibited and unpermitted activities at Parks and Recreation facilities.

Director Kelley presented the staff report per the agenda material. She outlined the background, the proposed ordinance, protecting City facilities, public safety, organized and commercial activities, and enforcement and penalties.

As there were no questions for staff, Mayor Segawa opened the public hearing at 8:02 p.m. As there were no requests from the public to speak on this item, Mayor Segawa closed the public hearing at 8:02 p.m. and invited a motion.

Assistant City Attorney Castillo read the title of the ordinance to be introduced.

Councilmember Gazeley made a motion, seconded by Councilmember Uphoff, to approve the recommended action.

MOTION CARRIED by the following vote:

AYES: Councilmembers Gazeley, Uphoff, Waronek, Mayor Pro Tem Waite, and Mayor Segawa
NOES: None
ABSENT: None
Tuesday, October 20, 2026 Reg CC MTG, Page *13
City Council Regular Meeting Minutes
August 18, 2026

Page 9 of 10 ends

Introduced the following titled ordinance:

ORDINANCE NO. 899 – AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, AMENDING CHAPTER 11 OF TITLE II OF THE LOMITA

MUNICIPAL CODE RELATING TO PARKS AND RECREATION FACILITIES

REGULATIONS AND FINDING THE ACTION TO BE CATEGORICALLY EXEMPT

FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
c. AMENDING THE OVERSIZED VEHICLE PERMIT PROGRAM AND ADOPTION OF

CORRESPONDING FEES
RECOMMENDED ACTION: After conducting a public hearing, and after the City Attorney reads the title, introduce on first reading an ordinance amending Lomita Municipal Code Title VIII (Motor Vehicles and Traffic), Chapter 10 (Oversized Vehicle Permits), Sections 8-10.01 through 8-10.04, and adding Section 8-10.05, to restructure the Oversized Vehicle Permit Program, waive further reading, and schedule the ordinance for second reading and adoption at a subsequent City Council meeting; and adopt a resolution, amending the Master Fee Schedule to establish registration and permit fees for City staff to process Oversized Vehicle Permits, and establishing fines and program parameters for the Oversized Vehicle Permit Program.

Community Safety Manager Lawson presented the staff report per the agenda material.

He outlined the background, community impact, proposed program and fees, how the permit program works, and program safeguards.

Brief City Council discussion took place regarding the fees being less onerous than those previously proposed.

As there was no further discussion, Mayor Segawa opened the public hearing at 8:08 p.m. As there were no requests from the public to speak on this item, Mayor Segawa closed the public hearing at 8:08 p.m. and invited a motion.

Assistant City Attorney Castillo read the title of the ordinance to be introduced.

Councilmember Gazeley made a motion, seconded by Mayor Pro Tem Waite, to approve the recommended action.

Introduced the following titled ordinance:

ORDINANCE NO. 900 - AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

LOMITA, CALIFORNIA, AMENDING LOMITA MUNICIPAL CODE TITLE VIII (MOTOR VEHICLES AND TRAFFIC), CHAPTER 10 (OVERSIZED VEHICLE PERMITS), SECTIONS 8-10.01 THROUGH 8-10.04, AND ADDING SECTION 8-10.05, TO AMEND

THE OVERSIZED VEHICLE PERMIT PROGRAM
Adopted the following titled resolution:

RESOLUTION NO. 2026-46 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF LOMITA, CALIFORNIA, TO AMEND THE MASTER FEE SCHEDULE TO INCLUDE

APPLICATION FEES FOR CITY STAFF TO PROCESS OVERSIZED VEHICLE

PERMITS, ESTABLISH PENALTIES AND PROGRAM PARAMETERS FOR THE

OVERSIZED VEHICLE PERMIT PROGRAM, AND FINDING THE ACTION TO BE

EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
Tuesday, October 20, 2026 Reg CC MTG, Page *14
City Council Regular Meeting Minutes
August 18, 2026

Page 10 of 10 ends

10. ADJOURNMENT
There being no further business to discuss, Mayor Segawa adjourned the meeting, in memory of former Lomita City Clerk/City Manager Dawn Tomita, at 8:14 p.m.

Respectfully Submitted,
________________________________
Kathleen Horn Gregory, MMC, City Clerk
Adopted:

Tuesday, October 20, 2026 Reg CC MTG, Page *15

CONSENT CALENDAR
AGENDA NO. 7.C.

October 20, 2026
TO: Honorable Mayor and City Council
FROM: Administrative Services Department
DATE: October 20, 2026
SUBJECT: WARRANT REGISTER

PAYROLL REGISTER
October 20, 2026 TOTAL WARRANTS ISSUED: $1,152,649.00
Wires Transfers: 11680-11684
Prepay: 537848
Void: 537858
Check Numbers: 537849-537928
Total Pages of Register: 14
October 2, 2026 TOTAL PAYROLL ISSUED: $168,621.73
I hereby certify that the demands or claims covered by the checks listed on pages 1 to 14 inclusive of the check register are accurate and funds are available for payment thereof:
_
Susan Kamada
Administrative Services Director
Tuesday, October 20, 2026 Reg CC MTG, Page *16
10/12/2026 3:23:03 PM Page 1 of 14
Warrant Register
Lomita, CA By Vendor Name
Payment Dates 10/7/2026 - 10/20/2026
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount Vendor: 6948 - A1 Lawnmower Shop
537849 10/20/2026 A1 Lawnmower Shop 01320 PW-PK-Mower Blades Sharpe… 18.00 Vendor 6948 - A1 Lawnmower Shop Total: 18.00
Vendor: 3663 - ABC Nursery, Inc.
537850 10/20/2026 ABC Nursery, Inc. 00336000 PW-PK-Plants 126.24 537850 10/20/2026 ABC Nursery, Inc. 0335998 PW-PK-Plants 267.32 537850 10/20/2026 ABC Nursery, Inc. 0335998 PW-PK-Plants 174.59 Vendor 3663 - ABC Nursery, Inc. Total: 568.15
Vendor: 7460 - ACE Business Machines, Inc.
537851 10/20/2026 ACE Business Machines, Inc. 58669 Stamp Machine Annual Service… 82.50 537851 10/20/2026 ACE Business Machines, Inc. 58669 Stamp Machine Annual Service… 82.50 Vendor 7460 - ACE Business Machines, Inc. Total: 165.00 Vendor: 13266 - AFSCME District Council 36
537852 10/20/2026 AFSCME District Council 36 October 26 Association Dues-October 26 2,121.75 Vendor 13266 - AFSCME District Council 36 Total: 2,121.75 Vendor: 12925 - AireSpring Inc.
537853 10/20/2026 AireSpring Inc. 213105101 Phone Services September 26 1,246.21 537853 10/20/2026 AireSpring Inc. 213105101 Phone Services September 26 1,246.20 Vendor 12925 - AireSpring Inc. Total: 2,492.41
Vendor: 13612 - Alcoa Traffic Control, Inc.
537854 10/20/2026 Alcoa Traffic Control, Inc. CIL-007 Traffic Control for Country Nig… 450.00 537854 10/20/2026 Alcoa Traffic Control, Inc. CIL-007 Traffic Control for Country Nig… 1,386.00 537854 10/20/2026 Alcoa Traffic Control, Inc. CIL-008 Traffic Control for Country Nig… 1,584.00 Vendor 13612 - Alcoa Traffic Control, Inc. Total: 3,420.00 Vendor: 7445 - All City Management Services, Inc.
537855 10/20/2026 All City Management Services, …PS-INV107636 Crossing Guard Services 6,094.80 537855 10/20/2026 All City Management Services, …PS-INV108023 Crossing Guard Services 4,875.84 Vendor 7445 - All City Management Services, Inc. Total: 10,970.64 Vendor: 0545 - Allied Waste Transfer Services (BFI Falcon TS) 537856 10/20/2026 Allied Waste Transfer Services …440-000024714 PW-Dump Fee 624.45 537856 10/20/2026 Allied Waste Transfer Services …4404-000024678 PW-Dump Fee 266.63 Vendor 0545 - Allied Waste Transfer Services (BFI Falcon TS) Total: 891.08 Vendor: 12155 - Amazon Capital Services
537857 10/20/2026 Amazon Capital Services 13NR-1CFD-RR67 Admin. Services-Office Supplies 19.60 537857 10/20/2026 Amazon Capital Services 19NX-3NF4-FNH1 Recreation-Senior Craft Suppli… 28.72 537857 10/20/2026 Amazon Capital Services 19NX-3NF4-FNH1 Recreation-Senior Craft Suppli… 7.72 537857 10/20/2026 Amazon Capital Services 19YR-9PJ7-Y6H1 Plastic Folding Tables for Coun… 327.52 537857 10/20/2026 Amazon Capital Services 1CT7-KYQF-43W7 PW-Office Supplies 68.55 537857 10/20/2026 Amazon Capital Services 1CTX-T6FH-1WQ3 CH-Refund for Shipping Charge -37.58 537857 10/20/2026 Amazon Capital Services 1DLD-X49R-4RYD IT-Office Supplies 14.89 537857 10/20/2026 Amazon Capital Services 1DRL-7T4K-H46P CH-Coffee Supplies 76.76 537857 10/20/2026 Amazon Capital Services 1FPC-F7C9-QT44 CH-2-Slice Toaster 33.14 537857 10/20/2026 Amazon Capital Services 1HLC-KDXH-QNXN Community Safety-Returning … -60.00 537857 10/20/2026 Amazon Capital Services 1K6W-616W-G9GD WTER-Maintenance Supplies 41.98 537857 10/20/2026 Amazon Capital Services 1K6W-616W-G9GD WTER-Maintenance Supplies 18.44 537857 10/20/2026 Amazon Capital Services 1K6W-616W-G9GD WTER-Maintenance Supplies 14.25 537857 10/20/2026 Amazon Capital Services 1L1J-MDW1-3P3W Recreation-Sport Supplies 88.38 537857 10/20/2026 Amazon Capital Services 1L1J-MDW1-3P3W Recreation-Sport Supplies 157.13 537857 10/20/2026 Amazon Capital Services 1LGF-HJ4Q-6V9Q Community Safety-Office Supp… 39.04 537857 10/20/2026 Amazon Capital Services 1LHF-3TFQ-T447 HR-Office Supplies 162.62 537857 10/20/2026 Amazon Capital Services 1LYX-YXWN-R9VV Country Night Supplies 97.20 537857 10/20/2026 Amazon Capital Services 1LYX-YXWN-R9VV Country Night Supplies 92.32 Tuesday, October 20, 2026 Reg CC MTG, Page *17
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 2 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount 537857 10/20/2026 Amazon Capital Services 1MX4-CLMK-PMJV CH-Picture Frame 75.79 537857 10/20/2026 Amazon Capital Services 1NYD-RDX6-3NVW IT-Office Supplies 6.62 537857 10/20/2026 Amazon Capital Services 1NYD-RDX6-3NVW IT-Office Supplies 11.09 537857 10/20/2026 Amazon Capital Services 1NYD-RDX6-3NVW IT-Office Supplies 25.27 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 15.45 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 15.45 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 19.87 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 22.08 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 22.09 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 44.16 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 13.24 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 44.19 537857 10/20/2026 Amazon Capital Services 1P9T-74VQ-RJTP Recreation-Country Night Sup… 92.79 537857 10/20/2026 Amazon Capital Services 1PVH-J4G6-H6GN CH-Returning Picture Frame -75.79 537857 10/20/2026 Amazon Capital Services 1QFT-LJGL-467F Community Safety-Office Supp… 88.38 537857 10/20/2026 Amazon Capital Services 1TDT-V4X6-NH47 Community Safety-Office Supp… 53.25 537857 10/20/2026 Amazon Capital Services 1TKN-NMFX-DNTC Admin. Services-office Supplies 59.64 537857 10/20/2026 Amazon Capital Services 1V13-M67R-TPTt Recreation-Supplies 28.07 537857 10/20/2026 Amazon Capital Services 1VHM-LP9C-6K3J HR-Office Supplies 5.74 537857 10/20/2026 Amazon Capital Services 1WN4-MLCD-9PNV PW-Returning Office Supplies -11.04 537857 10/20/2026 Amazon Capital Services 1WYD-LDX4-13TV City Manager-Office Chairs 25.40 537857 10/20/2026 Amazon Capital Services 1WYD-LDX4-13TV City Manager-Office Chairs 355.18 537857 10/20/2026 Amazon Capital Services 1XFY-1VTD-KLK4 City Council-Picture Frames 68.48 537857 10/20/2026 Amazon Capital Services 1YXG-FM77-4J4C CH-Coffee Supplies 12.90 537857 10/20/2026 Amazon Capital Services 1YXG-FM77-4J4C CH-Coffee Supplies 49.87 Vendor 12155 - Amazon Capital Services Total: 2,258.85
Vendor: 4010 - Ameritas Life Insurance
537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 58.84 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 2,442.48 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 180.78 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 41.19 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 91.19 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 29.42 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 117.68 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 235.36 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 26.48 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 111.80 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 205.94 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 200.06 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 88.26 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 17.65 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 11.77 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 60.26 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 17.65 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 26.48 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 29.42 537859 10/20/2026 Ameritas Life Insurance 100126 Employee Dental Insurance-O… 390.73 Vendor 4010 - Ameritas Life Insurance Total: 4,383.44
Vendor: 13761 - Ann Vogel
537860 10/20/2026 Ann Vogel 2005445.001 Refund-Senior Day Trip 30.00 Vendor 13761 - Ann Vogel Total: 30.00
Vendor: 12257 - Aramsco Inc.
537861 10/20/2026 Aramsco Inc. S7962112.001 PW-PK-Maintenance Supplies 35.42 537861 10/20/2026 Aramsco Inc. S7962112.001 PW-PK-Maintenance Supplies 50.96 537861 10/20/2026 Aramsco Inc. S7962112.001 PW-PK-Maintenance Supplies 196.47 537861 10/20/2026 Aramsco Inc. S7962112.001 PW-PK-Maintenance Supplies 210.40 537861 10/20/2026 Aramsco Inc. S7962112.001 PW-PK-Maintenance Supplies 782.00 Vendor 12257 - Aramsco Inc. Total: 1,275.25
Tuesday, October 20, 2026 Reg CC MTG, Page *18
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 3 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount Vendor: 3334 - Autozone, Inc.
537862 10/20/2026 Autozone, Inc. 02859966013 PW-PK-Equipment Maintenan… 2.00 537862 10/20/2026 Autozone, Inc. 02859966013 PW-PK-Equipment Maintenan… 187.84 537862 10/20/2026 Autozone, Inc. 02859968565 PW-Equipment Maintenance … 30.62 537862 10/20/2026 Autozone, Inc. 02859988781 PW-PK-Equipment Maintenan… 17.14 Vendor 3334 - Autozone, Inc. Total: 237.60
Vendor: 13769 - Belson Outdoors, LLC
537863 10/20/2026 Belson Outdoors, LLC 394851 PW-PK-Benches 248.64 537863 10/20/2026 Belson Outdoors, LLC 394851 PW-PK-Benches 2,583.00 Vendor 13769 - Belson Outdoors, LLC Total: 2,831.64
Vendor: 7477 - Best Best & Krieger, LLP
537864 10/20/2026 Best Best & Krieger, LLP 1074425 Legal Services July 26 9,184.25 537864 10/20/2026 Best Best & Krieger, LLP 1074425 Legal Services July 26 1,620.75 537864 10/20/2026 Best Best & Krieger, LLP 1074426 Code Enforcement/General Lit… 2,406.60 537864 10/20/2026 Best Best & Krieger, LLP 1074427 Special Services July 26 229.40 537864 10/20/2026 Best Best & Krieger, LLP 1074428 Special Services July 26 9,436.00 537864 10/20/2026 Best Best & Krieger, LLP 1074429 Special Services July 26 1,229.90 Vendor 7477 - Best Best & Krieger, LLP Total: 24,106.90 Vendor: 13133 - California Municipal Statistics, Inc.
537865 10/20/2026 California Municipal Statistics, …26093001 FY 2025-26 ACFR Statistical Pa… 600.00 Vendor 13133 - California Municipal Statistics, Inc. Total: 600.00 Vendor: 0655 - California Water Service
537866 10/20/2026 California Water Service 6984422222-092526 PV Dr N, Rolling Vista Medians 513.65 Vendor 0655 - California Water Service Total: 513.65
Vendor: 13253 - Cassandra Linares DBA Dinger City Baseball 537867 10/20/2026 Cassandra Linares DBA Dinger… 1078 Recreation-T-Shirts 55.13 Vendor 13253 - Cassandra Linares DBA Dinger City Baseball Total: 55.13 Vendor: 12501 - Charter Communications Operating, LLC
537868 10/20/2026 Charter Communications Ope… 127562601100126 Internet Services October 26 453.86 537868 10/20/2026 Charter Communications Ope… 127562601100126 Internet Services October 26 453.86 Vendor 12501 - Charter Communications Operating, LLC Total: 907.72 Vendor: 0915 - Copy Rite Printing
537869 10/20/2026 Copy Rite Printing 40085 Business Cards-A. Fernandez 229.10 537869 10/20/2026 Copy Rite Printing 40127 Business Cards-F. Dubon 62.68 537869 10/20/2026 Copy Rite Printing 40134 CH-Regular Envelopes 177.45 Vendor 0915 - Copy Rite Printing Total: 469.23
Vendor: 7371 - Corporate Payment Systems
537870 10/20/2026 Corporate Payment Systems A. Fernandez 092526 A. Fernandez 9-25-26 100.00 537870 10/20/2026 Corporate Payment Systems A. Fernandez 092526 A. Fernandez 9-25-26 650.00 537870 10/20/2026 Corporate Payment Systems A. Fernandez 092526 A. Fernandez 9-25-26 71.71 537870 10/20/2026 Corporate Payment Systems A. Fernandez 092526 A. Fernandez 9-25-26 100.37 537870 10/20/2026 Corporate Payment Systems A. Vialpando 092526 A. Vialpando 9-25-26 -600.00 537870 10/20/2026 Corporate Payment Systems A. Vialpando 092526 A. Vialpando 9-25-26 -75.00 537870 10/20/2026 Corporate Payment Systems A. Vialpando 092526 A. Vialpando 9-25-26 100.00 537870 10/20/2026 Corporate Payment Systems A. Vialpando 092526 A. Vialpando 9-25-26 75.00 537870 10/20/2026 Corporate Payment Systems A. Vialpando 092526 A. Vialpando 9-25-26 16.55 537870 10/20/2026 Corporate Payment Systems A. Vialpando 092526 A. Vialpando 9-25-26 730.69 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 29.70 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 439.92 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 198.03 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 70.94 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 4.49 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 20.68 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 16.30 537870 10/20/2026 Corporate Payment Systems D. Dixon 092526 D. Dixon 9-25-26 6.99 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 71.67 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 23.92 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 624.12 Tuesday, October 20, 2026 Reg CC MTG, Page *19
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 4 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 228.00 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 36.00 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 218.94 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 11.00 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 11.00 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 22.00 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 136.53 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 174.08 537870 10/20/2026 Corporate Payment Systems J. Campos 092526 J. Campos 9-25-26 136.71 537870 10/20/2026 Corporate Payment Systems J. Ibarra 092526 J. Ibarra 9-25-26 56.27 537870 10/20/2026 Corporate Payment Systems J. Monge 092526 J. Monge 9-25-26 165.00 537870 10/20/2026 Corporate Payment Systems J. Monge 092526 J. Monge 9-25-26 17.88 537870 10/20/2026 Corporate Payment Systems K. Gregory 092526 K. Gregory 9-25-26 18.00 537870 10/20/2026 Corporate Payment Systems K. Gregory 092526 K. Gregory 9-25-26 148.00 537870 10/20/2026 Corporate Payment Systems K. Gregory 092526 K. Gregory 9-25-26 19.99 537870 10/20/2026 Corporate Payment Systems L. Abbott 092526 L. Abbott 9-25-26 148.47 537870 10/20/2026 Corporate Payment Systems L. Hernandez 092526 L. Hernandez 9-25-26 6.83 537870 10/20/2026 Corporate Payment Systems L. Hernandez 092526 L. Hernandez 9-25-26 43.00 537870 10/20/2026 Corporate Payment Systems L. Hernandez 092526 L. Hernandez 9-25-26 110.00 537870 10/20/2026 Corporate Payment Systems L. Hernandez 092526 L. Hernandez 9-25-26 688.39 537870 10/20/2026 Corporate Payment Systems L. Hernandez 092526 L. Hernandez 9-25-26 120.89 537870 10/20/2026 Corporate Payment Systems Lomita Park 092526 Lomita Park 9-25-26 393.65 537870 10/20/2026 Corporate Payment Systems Lomita Park 092526 Lomita Park 9-25-26 12.99 537870 10/20/2026 Corporate Payment Systems Lomita Park 092526 Lomita Park 9-25-26 185.00 537870 10/20/2026 Corporate Payment Systems Lomita Park 092526 Lomita Park 9-25-26 25.12 537870 10/20/2026 Corporate Payment Systems Lomita Park 092526 Lomita Park 9-25-26 24.76 537870 10/20/2026 Corporate Payment Systems Lomita Park 092526 Lomita Park 9-25-26 372.65 537870 10/20/2026 Corporate Payment Systems Lomita Park 092526 Lomita Park 9-25-26 485.36 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 511.83 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 511.83 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 340.26 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 1,573.07 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 911.62 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 60.53 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 268.42 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 524.35 537870 10/20/2026 Corporate Payment Systems S. Kamada 092526 S. Kamada 9-25-26 340.27 537870 10/20/2026 Corporate Payment Systems S. Ritchie 092526 S. Ritchie 9-25-26 100.00 537870 10/20/2026 Corporate Payment Systems S. Ritchie 092526 S. Ritchie 9-25-26 1,045.81 537870 10/20/2026 Corporate Payment Systems S. Ritchie 092526 S. Ritchie 9-25-26 59.04 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 300.00 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 90.26 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 642.09 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 85.65 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 65.29 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 174.91 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 151.08 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 27.53 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 53.94 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 106.43 537870 10/20/2026 Corporate Payment Systems V. Mesa 092526 V. Mesa 9-25-26 36.15 537870 10/20/2026 Corporate Payment Systems W. Lawson 092526 W. Lawson 9-25-26 128.74 537870 10/20/2026 Corporate Payment Systems W. Lawson 092526 W. Lawson 9-25-26 297.50 537870 10/20/2026 Corporate Payment Systems W. Lawson 092526 W. Lawson 9-25-26 66.12 537870 10/20/2026 Corporate Payment Systems W. Lawson 092526 W. Lawson 9-25-26 347.50 537870 10/20/2026 Corporate Payment Systems W. Lawson 092526 W. Lawson 9-25-26 51.50 Vendor 7371 - Corporate Payment Systems Total: 15,564.31 Vendor: 13629 - CSG Consultants, Inc.
537871 10/20/2026 CSG Consultants, Inc. 68108 Code Enforcement Services S… 7,810.50 Vendor 13629 - CSG Consultants, Inc. Total: 7,810.50
Tuesday, October 20, 2026 Reg CC MTG, Page *20
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 5 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount Vendor: 6757 - Dataprose, Inc.
537872 10/20/2026 Dataprose, Inc. DP2604763 Water Bills & Local Travel Net… 63.68 537872 10/20/2026 Dataprose, Inc. DP2604763 Water Bills & Local Travel Net… 3,271.06 Vendor 6757 - Dataprose, Inc. Total: 3,334.74
Vendor: 13760 - Deb Chery
537873 10/20/2026 Deb Chery 2005444.001 Refund-Senior Day Trip 30.00 537873 10/20/2026 Deb Chery 2005444.001 Refund-Senior Day Trip 30.00 Vendor 13760 - Deb Chery Total: 60.00
Vendor: 4694 - Deborah Dixon
537874 10/20/2026 Deborah Dixon 100926 JPIA Risk Management Consor… 402.80 Vendor 4694 - Deborah Dixon Total: 402.80
Vendor: 13762 - Denise Thurston
537875 10/20/2026 Denise Thurston 2005453.001 Refund-Senior Day Trip 30.00 Vendor 13762 - Denise Thurston Total: 30.00
Vendor: 1075 - Department of Justice
537876 10/20/2026 Department of Justice 079906 Employment Live Scan 143.00 Vendor 1075 - Department of Justice Total: 143.00
Vendor: 13298 - Devean Williams
537877 10/20/2026 Devean Williams 100626 Adult Basketball Score Keeping 210.00 Vendor 13298 - Devean Williams Total: 210.00
Vendor: 7340 - Division of the State Architect
537878 10/20/2026 Division of the State Architect 400226 July-September 26 136.40 Vendor 7340 - Division of the State Architect Total: 136.40 Vendor: 7438 - Duke Service Center, Inc.
537879 10/20/2026 Duke Service Center, Inc. 093026 Gas September 26 1,363.88 537879 10/20/2026 Duke Service Center, Inc. 093026 Gas September 26 1,673.85 537879 10/20/2026 Duke Service Center, Inc. 093026 Gas September 26 1,047.71 Vendor 7438 - Duke Service Center, Inc. Total: 4,085.44 Vendor: 13234 - EdgeSoft, Inc.
537880 10/20/2026 EdgeSoft, Inc. 3679 Monthly AI Solution Software… 1,500.00 Vendor 13234 - EdgeSoft, Inc. Total: 1,500.00
Vendor: 2095 - Ewing Irrigation Products
537881 10/20/2026 Ewing Irrigation Products 32019930 PW-PK-Landscape Maintenan… 330.55 537881 10/20/2026 Ewing Irrigation Products 32019930 PW-PK-Landscape Maintenan… 20.06 537881 10/20/2026 Ewing Irrigation Products 32019930 PW-PK-Landscape Maintenan… 20.30 537881 10/20/2026 Ewing Irrigation Products 32019930 PW-PK-Landscape Maintenan… 23.56 537881 10/20/2026 Ewing Irrigation Products 32019930 PW-PK-Landscape Maintenan… 17.66 Vendor 2095 - Ewing Irrigation Products Total: 412.13
Vendor: 3015 - FedEx
537882 10/20/2026 FedEx 9-477-65087 Planning-Mail Service 104.99 Vendor 3015 - FedEx Total: 104.99
Vendor: 7116 - Ferguson Waterworks #1083
537883 10/20/2026 Ferguson Waterworks #1083 0085864 WTR-Maintenance Supplies 967.10 537883 10/20/2026 Ferguson Waterworks #1083 0085864 WTR-Maintenance Supplies 877.15 537883 10/20/2026 Ferguson Waterworks #1083 0085864 WTR-Maintenance Supplies 296.14 537883 10/20/2026 Ferguson Waterworks #1083 0085865 WTR-Maintenance Supplies 347.41 537883 10/20/2026 Ferguson Waterworks #1083 0085865 WTR-Maintenance Supplies 810.19 537883 10/20/2026 Ferguson Waterworks #1083 0085865 WTR-Maintenance Supplies 351.17 537883 10/20/2026 Ferguson Waterworks #1083 0085865 WTR-Maintenance Supplies 504.32 537883 10/20/2026 Ferguson Waterworks #1083 0085865 WTR-Maintenance Supplies 655.49 537883 10/20/2026 Ferguson Waterworks #1083 0085865 WTR-Maintenance Supplies 204.31 Vendor 7116 - Ferguson Waterworks #1083 Total: 5,013.28 Vendor: 13766 - Genki Kosuge
537884 10/20/2026 Genki Kosuge 2005461.001 Refund-Picnic Shelter Deposit 40.00 Vendor 13766 - Genki Kosuge Total: 40.00
Tuesday, October 20, 2026 Reg CC MTG, Page *21
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 6 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount Vendor: 6946 - Hach Company
537885 10/20/2026 Hach Company 15185112 CWPF-Chemical Supplies 57.34 537885 10/20/2026 Hach Company 15185112 CWPF-Chemical Supplies 67.52 537885 10/20/2026 Hach Company 15185112 CWPF-Chemical Supplies 69.78 537885 10/20/2026 Hach Company 15185112 CWPF-Chemical Supplies 73.26 537885 10/20/2026 Hach Company 15185112 CWPF-Chemical Supplies 97.60 Vendor 6946 - Hach Company Total: 365.50
Vendor: 3036 - Harbor Freight Tools USA, Inc.
537886 10/20/2026 Harbor Freight Tools USA, Inc. 24f8bd0f WTR-Small Tools 33.13 Vendor 3036 - Harbor Freight Tools USA, Inc. Total: 33.13 Vendor: 12505 - Integrated Media Systems
537887 10/20/2026 Integrated Media Systems 48082 IT-Distribution Amplifier 1,094.75 Vendor 12505 - Integrated Media Systems Total: 1,094.75 Vendor: 13671 - Iron Mountain Inc
537888 10/20/2026 Iron Mountain Inc LRGM719 Planning-File Storage Septem… 165.25 Vendor 13671 - Iron Mountain Inc Total: 165.25
Vendor: 13764 - Isac Lepe
537889 10/20/2026 Isac Lepe 2005459.001 Refund-Picnic Shelter Deposit 40.00 Vendor 13764 - Isac Lepe Total: 40.00
Vendor: 12757 - Jenna Barnett
537890 10/20/2026 Jenna Barnett 100426 Mileage Reimbursement 14.06 Vendor 12757 - Jenna Barnett Total: 14.06
Vendor: 6525 - Jiffy Lube #930
537891 10/20/2026 Jiffy Lube #930 450079 WTR-2025 Ford F-150 Oil Cha… 22.05 537891 10/20/2026 Jiffy Lube #930 450079 WTR-2025 Ford F-150 Oil Cha… 204.86 Vendor 6525 - Jiffy Lube #930 Total: 226.91
Vendor: 12069 - Joe A. Gonsalves & Son
537892 10/20/2026 Joe A. Gonsalves & Son 164703 Consulting Services-Legislative… 3,500.00 Vendor 12069 - Joe A. Gonsalves & Son Total: 3,500.00
Vendor: 4692 - Kathleen Gregory
537893 10/20/2026 Kathleen Gregory 100626 Wellness Reimbursment 56.00 Vendor 4692 - Kathleen Gregory Total: 56.00
Vendor: 12635 - Kiley & Associates, LLC
537894 10/20/2026 Kiley & Associates, LLC LO 260930 Consulting Services, Legislative… 3,500.00 Vendor 12635 - Kiley & Associates, LLC Total: 3,500.00
Vendor: 13765 - Kimberly Kreszyn
537895 10/20/2026 Kimberly Kreszyn 2005460.001 Refund-Picnic Shelter Deposit 40.00 Vendor 13765 - Kimberly Kreszyn Total: 40.00
Vendor: 3048 - L.A. County Sheriff's Department
537896 10/20/2026 L.A. County Sheriff's Departm… 270361AY August 26 345,742.92 537896 10/20/2026 L.A. County Sheriff's Departm… 270361AY August 26 20,662.75 537896 10/20/2026 L.A. County Sheriff's Departm… 270361AY August 26 53,007.99 Vendor 3048 - L.A. County Sheriff's Department Total: 419,413.66 Vendor: 13496 - Lan Wan Enterprise, Inc.
537897 10/20/2026 Lan Wan Enterprise, Inc. 77791 IT Services September 26 7,000.00 537897 10/20/2026 Lan Wan Enterprise, Inc. 77791 IT Services September 26 7,000.00 537897 10/20/2026 Lan Wan Enterprise, Inc. 77830 Phone Services October 26 593.78 537897 10/20/2026 Lan Wan Enterprise, Inc. 77830 Phone Services October 26 593.79 Vendor 13496 - Lan Wan Enterprise, Inc. Total: 15,187.57 Vendor: 3331 - Lee's Tires
537898 10/20/2026 Lee's Tires 107982 WTR-2025 Ford F-350 Super D… 106.27 537898 10/20/2026 Lee's Tires 107982 WTR-2025 Ford F-350 Super D… 52.50 537898 10/20/2026 Lee's Tires 108748 Community Safety-2025 Ford… 20.00 Vendor 3331 - Lee's Tires Total: 178.77
Tuesday, October 20, 2026 Reg CC MTG, Page *22
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 7 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount Vendor: 12979 - Liane Mason
537899 10/20/2026 Liane Mason 2005443.001 Refund-Senior Day Trip 30.00 Vendor 12979 - Liane Mason Total: 30.00
Vendor: 13005 - Lomita Mower & Saw Shop
537900 10/20/2026 Lomita Mower & Saw Shop 13461 PW-Chain Saws Repair 813.00 537900 10/20/2026 Lomita Mower & Saw Shop 13461 PW-Chain Saws Repair 1,716.53 Vendor 13005 - Lomita Mower & Saw Shop Total: 2,529.53
Vendor: 3095 - Lomita Railroad Museum Foundation
11680 10/07/2026 Lomita Railroad Museum Fou… 100726 Museum Foundation Revenue… 1,079.00 Vendor 3095 - Lomita Railroad Museum Foundation Total: 1,079.00 Vendor: 12930 - Maria Mancillas
537901 10/20/2026 Maria Mancillas 102426B Balloon Twister for Halloween… 375.00 Vendor 12930 - Maria Mancillas Total: 375.00
Vendor: 13763 - Maria Velazquez
537902 10/20/2026 Maria Velazquez 2005455.001 Refund-Senior Day Trip 30.00 Vendor 13763 - Maria Velazquez Total: 30.00
Vendor: 6020 - Mark Waronek
537903 10/20/2026 Mark Waronek 083026 CCCA Fall Seminar-Oceanside 1,000.12 Vendor 6020 - Mark Waronek Total: 1,000.12
Vendor: 13306 - Meridian Rapid Defense Group Rentals LLC 537904 10/20/2026 Meridian Rapid Defense Group…INV-R-7050 Traffic Control for Country Nig… 2,386.80 537904 10/20/2026 Meridian Rapid Defense Group…INV-R-7050 Traffic Control for Country Nig… 2,885.71 Vendor 13306 - Meridian Rapid Defense Group Rentals LLC Total: 5,272.51 Vendor: 7247 - Michael Baker International, Inc.
537905 10/20/2026 Michael Baker International, I… 130337 Consulting Services CDBG Sep… 1,585.00 537905 10/20/2026 Michael Baker International, I… 130337 Consulting Services CDBG Sep… 1,697.50 Vendor 7247 - Michael Baker International, Inc. Total: 3,282.50 Vendor: 13628 - Micon Construction, Inc.
537906 10/20/2026 Micon Construction, Inc. 7942-Retention Replace Playground Equip. & … 25,818.30 Vendor 13628 - Micon Construction, Inc. Total: 25,818.30 Vendor: 6828 - MJ Management Services, LLC
537907 10/20/2026 MJ Management Services, LLC CINV-232701 DAR September 26 548.33 Vendor 6828 - MJ Management Services, LLC Total: 548.33 Vendor: 6594 - Office Depot Business Solutions, LLC
537908 10/20/2026 Office Depot Business Solutio… 483410124001 CH-Office Supplies 75.98 537908 10/20/2026 Office Depot Business Solutio… 483576556001 CH-Office Supplies 47.19 537908 10/20/2026 Office Depot Business Solutio… 483576556001 CH-Office Supplies 17.11 537908 10/20/2026 Office Depot Business Solutio… 483576556001 CH-Office Supplies 13.14 Vendor 6594 - Office Depot Business Solutions, LLC Total: 153.42 Vendor: 12512 - Prints Pacific, Inc.
537909 10/20/2026 Prints Pacific, Inc. 20761 Community Safety-Uniforms 108.11 537909 10/20/2026 Prints Pacific, Inc. 20761 Community Safety-Uniforms 150.39 537909 10/20/2026 Prints Pacific, Inc. 20761 Community Safety-Uniforms 116.22 537909 10/20/2026 Prints Pacific, Inc. 20761 Community Safety-Uniforms 68.04 537909 10/20/2026 Prints Pacific, Inc. 20761 Community Safety-Uniforms 56.44 537909 10/20/2026 Prints Pacific, Inc. 20761 Community Safety-Uniforms 53.11 537909 10/20/2026 Prints Pacific, Inc. 20761 Community Safety-Uniforms 30.75 Vendor 12512 - Prints Pacific, Inc. Total: 583.06
Vendor: 4090 - Public Employee Retirement System
11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 15,906.73 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 68.48 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 352.56 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 1,459.54 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 258.34 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 263.41 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 318.31 Tuesday, October 20, 2026 Reg CC MTG, Page *23
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 8 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 294.93 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 721.34 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 415.76 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 346.81 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 662.26 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 807.96 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 1,167.33 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 796.61 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 459.55 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 370.10 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 281.18 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 901.61 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 840.66 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 408.45 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 339.70 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 320.48 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 410.84 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 64.03 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 53.13 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 7.61 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 115.77 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 378.59 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 85.06 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 112.89 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 106.10 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 98.31 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 667.92 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 329.51 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 346.81 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 825.39 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 59.95 11681 10/07/2026 Public Employee Retirement S…PE092526 Retirement Contributions Pay … 3,088.59 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 6,007.72 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 3,887.27 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 642.54 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 3,773.79 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 45.21 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 4,226.19 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 1,931.73 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 5,581.20 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 1,611.57 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 1,780.13 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 3,330.00 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 5,130.51 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 4,639.59 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 1,351.81 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 338.56 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 198.11 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 1,068.42 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 275.37 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 3,239.31 11682 10/10/2026 Public Employee Retirement S…October 26 Employee Health Insurance-O… 11,723.67 11683 10/10/2026 Public Employee Retirement S…18423883 GASB 68 Report 350.00 Vendor 4090 - Public Employee Retirement System Total: 95,645.30 Vendor: 12844 - Qusai Smirat
537910 10/20/2026 Qusai Smirat 7A2AB210-0006 Holidays Signs 5,937.75 Vendor 12844 - Qusai Smirat Total: 5,937.75
Vendor: 12173 - Race Communications
537911 10/20/2026 Race Communications RC2461148 Internet Access-SBCOG Octob… 1,530.00 Tuesday, October 20, 2026 Reg CC MTG, Page *24
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 9 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount 537911 10/20/2026 Race Communications RC2461148 Internet Access-SBCOG Octob… 1,530.00 Vendor 12173 - Race Communications Total: 3,060.00
Vendor: 12285 - Roadline Products Inc. USA
537912 10/20/2026 Roadline Products Inc. USA 23556 PW-Maintenance Supplies 419.90 537912 10/20/2026 Roadline Products Inc. USA 23556 PW-Maintenance Supplies 265.20 Vendor 12285 - Roadline Products Inc. USA Total: 685.10 Vendor: 7394 - Sharmone P. La Rose
537913 10/20/2026 Sharmone P. La Rose 092826 Recreation-Gentle Yoga Class … 1,234.80 Vendor 7394 - Sharmone P. La Rose Total: 1,234.80
Vendor: 7188 - Sharp Business Systems
537914 10/20/2026 Sharp Business Systems 9005986067 CH-BP70C55 Copier Usage 9/3… 283.77 Vendor 7188 - Sharp Business Systems Total: 283.77
Vendor: 13553 - Site Secure LLC
537915 10/20/2026 Site Secure LLC 3041 Surveillance Rental September… 1,756.00 Vendor 13553 - Site Secure LLC Total: 1,756.00
Vendor: 13254 - Soffa Electric Inc.
537916 10/20/2026 Soffa Electric Inc. 25-2271 SCADA Support Services 840.00 537916 10/20/2026 Soffa Electric Inc. 25-2271 SCADA Support Services 2,000.00 537916 10/20/2026 Soffa Electric Inc. 25-2271 SCADA Support Services 2,460.00 537916 10/20/2026 Soffa Electric Inc. 25-2271 SCADA Support Services 5,160.00 537916 10/20/2026 Soffa Electric Inc. 25-2271 SCADA Support Services 5,160.00 Vendor 13254 - Soffa Electric Inc. Total: 15,620.00
Vendor: 13768 - South Bay Material Yard Inc.
537917 10/20/2026 South Bay Material Yard Inc. 000103 WTR-Maintenance Supplies 137.81 Vendor 13768 - South Bay Material Yard Inc. Total: 137.81 Vendor: 5050 - Southern California Edison Co.
537848 10/12/2026 Southern California Edison Co. 700006214310-100126 Lomita Park, Street Lights, & T… 2,678.69 537848 10/12/2026 Southern California Edison Co. 700006214310-100126 Lomita Park, Street Lights, & T… 46.06 537848 10/12/2026 Southern California Edison Co. 700006214310-100126 Lomita Park, Street Lights, & T… 34.00 537848 10/12/2026 Southern California Edison Co. 700006910888-100726 Railroad Museum 315.93 537848 10/12/2026 Southern California Edison Co. 700008444906-100726 Traffic Signals 660.29 537848 10/12/2026 Southern California Edison Co. 700025877624-100126 Street Lights 551.04 537848 10/12/2026 Southern California Edison Co. 700025957042-100126 Street Lights 245.07 537848 10/12/2026 Southern California Edison Co. 700315793648-100126 Street Lights 174.70 537848 10/12/2026 Southern California Edison Co. 700420008832-100626 Cypress Reservoir 3,838.62 537918 10/20/2026 Southern California Edison Co. 700007178650-100926 Narbonne Pedestrian Crosswa… 64.55 537918 10/20/2026 Southern California Edison Co. 700016714053-100726 Appian Way, Lomita Park, & … 2,396.88 537918 10/20/2026 Southern California Edison Co. 700016714053-100726 Appian Way, Lomita Park, & … -20.11 537918 10/20/2026 Southern California Edison Co. 700016714053-100726 Appian Way, Lomita Park, & … 126.05 Vendor 5050 - Southern California Edison Co. Total: 11,111.77 Vendor: 1005 - Southern California News Group
537919 10/20/2026 Southern California News Gro… 093026 Legal Notice Ads 825.27 537919 10/20/2026 Southern California News Gro… 093026 Legal Notice Ads 710.89 537919 10/20/2026 Southern California News Gro… 093026 Legal Notice Ads 555.18 Vendor 1005 - Southern California News Group Total: 2,091.34 Vendor: 13617 - Sunbelt Rentals, Inc.
537920 10/20/2026 Sunbelt Rentals, Inc. 189852014-0001 PW-PK-Sod Cutter Rental 278.32 537920 10/20/2026 Sunbelt Rentals, Inc. 189852014-0001 PW-PK-Sod Cutter Rental 41.66 537920 10/20/2026 Sunbelt Rentals, Inc. 189852014-0001 PW-PK-Sod Cutter Rental 5.41 Vendor 13617 - Sunbelt Rentals, Inc. Total: 325.39
Vendor: 6085 - Thompson Building Materials
537921 10/20/2026 Thompson Building Materials IV-I02974 PW-Small Tools 127.49 537921 10/20/2026 Thompson Building Materials IV-I03237 PW-PK-Maintenance Supplies 143.07 537921 10/20/2026 Thompson Building Materials IV-I03237 PW-PK-Maintenance Supplies 168.43 537921 10/20/2026 Thompson Building Materials IV-I03314 PW-Maintenance Supplies 282.38 537921 10/20/2026 Thompson Building Materials IV-I03314 PW-Maintenance Supplies 41.07 537921 10/20/2026 Thompson Building Materials IV-I03314 PW-Maintenance Supplies 13.63 Tuesday, October 20, 2026 Reg CC MTG, Page *25
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 10 of 14
Payment Number Payment Date Vendor Name Payable Number Description (Payable) Amount 537921 10/20/2026 Thompson Building Materials IV-I03314 PW-Maintenance Supplies 48.84 537921 10/20/2026 Thompson Building Materials IV-I03314 PW-Maintenance Supplies 3.16 Vendor 6085 - Thompson Building Materials Total: 828.07 Vendor: 12170 - T-Mobile
537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 147.00 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 29.40 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 29.40 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 102.00 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 92.11 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 19.74 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 25.93 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 107.19 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 89.30 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 50.40 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 64.82 537922 10/20/2026 T-Mobile 092026 Employee Phone Charge 427.99 Vendor 12170 - T-Mobile Total: 1,185.28
Vendor: 7353 - Torrance Industrial Hardware
537923 10/20/2026 Torrance Industrial Hardware 13097 PW-PK-Maintenance Supplies 8.82 537923 10/20/2026 Torrance Industrial Hardware 13097 PW-PK-Maintenance Supplies 20.22 537923 10/20/2026 Torrance Industrial Hardware 13138 FAC-Maintenance Supplies 19.88 537923 10/20/2026 Torrance Industrial Hardware 13138 FAC-Maintenance Supplies 22.09 537923 10/20/2026 Torrance Industrial Hardware 13138 FAC-Maintenance Supplies 7.59 537923 10/20/2026 Torrance Industrial Hardware 13138 FAC-Maintenance Supplies 8.83 537923 10/20/2026 Torrance Industrial Hardware 13149 FAC-Maintenance Supplies 35.26 Vendor 7353 - Torrance Industrial Hardware Total: 122.69 Vendor: 13767 - Tracee Peterson
537924 10/20/2026 Tracee Peterson 2005462.001 Refund-Picnic Shelter Deposit 40.00 Vendor 13767 - Tracee Peterson Total: 40.00
Vendor: 3123 - Underground Service Alert/SC
537925 10/20/2026 Underground Service Alert/SC 920260434 25 Dig Alerts & Monthly Main… 63.30 Vendor 3123 - Underground Service Alert/SC Total: 63.30 Vendor: 12279 - United Pacific Services, Inc.
537926 10/20/2026 United Pacific Services, Inc. 26-0926-4 Tree Trimming Services 5,009.00 537926 10/20/2026 United Pacific Services, Inc. 26-0926-4 Tree Trimming Services 6,917.00 537926 10/20/2026 United Pacific Services, Inc. 26-1003-9 Tree Trimming Services 5,859.00 537926 10/20/2026 United Pacific Services, Inc. 26-1003-9 Tree Trimming Services 8,092.00 Vendor 12279 - United Pacific Services, Inc. Total: 25,877.00 Vendor: 3044 - West Basin Municipal Water District
11684 10/09/2026 West Basin Municipal Water D…3190 August 26 404,742.40 Vendor 3044 - West Basin Municipal Water District Total: 404,742.40 Vendor: 12250 - William D. Uphoff
537927 10/20/2026 William D. Uphoff 092526 Cal Cities Annual Conference 50.00 Vendor 12250 - William D. Uphoff Total: 50.00
Vendor: 6102 - Yunex, LLC
537928 10/20/2026 Yunex, LLC 90011299 Street Light Maintenance Sep… 169.83 Vendor 6102 - Yunex, LLC Total: 169.83
Grand Total: 1,152,649.00
Tuesday, October 20, 2026 Reg CC MTG, Page *26
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 11 of 14
Report Summary
Fund Summary
Fund Payment Amount
100 - General Fund 620,766.96
205 - State Gas Tax 25,690.56
209 - Measure M 63.68
215 - Community Development Block Grant 3,282.50
220 - Proposition A Local Return 968.57
255 - Park Athletic 777.56
257 - Park Grant 25,818.30
510 - Water Operations 472,935.80
520 - Water Capital 1,266.07
720 - Railroad Museum Foundation 1,079.00
Grand Total: 1,152,649.00
Account Summary
Account Number Account Name Payment Amount
100-000-2285.000 Employee Association D… 2,121.75
100-000-2510.000 PERS 15,906.73
100-000-2515.000 Health Insurance 6,007.72
100-000-2540.000 Dental Insurance 2,501.32
100-000-4455.000 Parks and Recreation Fe… 180.00
100-000-4510.000 Park Rentals 160.00
100-000-4616.000 CASP Fee 136.40
100-110-5217.000 PERS Tier 3 (2%@62) 68.48
100-110-5415.000 Communications 147.00
100-110-5430.000 Conferences and Meetin… 475.12
100-110-5505.000 Office Supplies and Expe… 68.48
100-110-5755.000 Special Department Supp… 148.47
100-120-5305.000 Legal Services 22,486.15
100-125-5205.000 Health Insurance 4,068.05
100-125-5215.000 PERS Tier 1 (2.5%@55) 352.56
100-125-5216.000 PERS Tier 2 (2%@60) 1,459.54
100-125-5217.000 PERS Tier 3 (2%@62) 258.34
100-125-5345.000 Contractual Services 8,659.83
100-125-5415.000 Communications 29.40
100-125-5430.000 Conferences and Meetin… 131.27
100-125-5755.000 Special Department Supp… 2,222.85
100-130-5205.000 Health Insurance 683.73
100-130-5216.000 PERS Tier 2 (2%@60) 263.41
100-130-5217.000 PERS Tier 3 (2%@62) 318.31
100-130-5410.000 Advertising 843.27
100-130-5425.000 Dues and Memberships 148.00
100-130-5505.000 Office Supplies and Expe… 330.87
100-130-5755.000 Special Department Supp… 155.08
100-210-5205.000 Health Insurance 3,864.98
100-210-5215.000 PERS Tier 1 (2.5%@55) 294.93
100-210-5216.000 PERS Tier 2 (2%@60) 721.34
100-210-5217.000 PERS Tier 3 (2%@62) 415.76
100-210-5310.000 Auditors 600.00
100-210-5345.000 Contractual Services 350.00
100-210-5505.000 Office Supplies and Expe… 19.60
100-210-5710.000 Equipment Maintenance 82.50
100-230-5205.000 Health Insurance 74.63
100-230-5206.000 Health Insurance Retirees 4,226.19
100-230-5217.000 PERS Tier 3 (2%@62) 346.81
100-230-5345.000 Contractual Services 143.00
100-230-5430.000 Conferences and Meetin… 402.80
100-230-5755.000 Special Department Supp… 1,071.05
100-330-5320.000 Sheriff Contract 345,742.92
Tuesday, October 20, 2026 Reg CC MTG, Page *27
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 12 of 14
Account Summary
Account Number Account Name Payment Amount
100-330-5321.000 Core Deputy 20,662.75
100-330-5323.000 Liability Trust Fund 53,007.99
100-333-5755.000 Special Department Supp… 29.40
100-335-5205.000 Health Insurance 2,049.41
100-335-5217.000 PERS Tier 3 (2%@62) 662.26
100-335-5345.000 Contractual Services 12,726.64
100-335-5430.000 Conferences and Meetin… 1,247.99
100-335-5505.000 Office Supplies and Expe… 343.56
100-335-5515.000 Uniform Expense 2,401.24
100-335-5710.000 Equipment Maintenance 64.00
100-335-5720.000 Fuel 447.32
100-410-5205.000 Health Insurance 5,816.56
100-410-5216.000 PERS Tier 2 (2%@60) 807.96
100-410-5217.000 PERS Tier 3 (2%@62) 1,167.33
100-410-5340.000 Professional Services 7,862.00
100-410-5345.000 Contractual Services 165.25
100-410-5415.000 Communications 92.11
100-410-5425.000 Dues and Memberships 100.00
100-410-5435.000 Training and Education 650.00
100-410-5505.000 Office Supplies and Expe… 291.78
100-410-5515.000 Uniform Expense 71.71
100-410-5720.000 Fuel 100.37
100-440-5345.000 Contractual Services 12,903.56
100-440-5415.000 Communications 1,839.99
100-440-5505.000 Office Supplies and Expe… 104.99
100-440-5525.000 Equipment Under $5k 57.87
100-440-5605.000 Rents and Leases 283.77
100-605-5205.000 Health Insurance 1,638.05
100-605-5217.000 PERS Tier 3 (2%@62) 796.61
100-605-5415.000 Communications 19.74
100-605-5505.000 Office Supplies and Expe… 57.51
100-610-5205.000 Health Insurance 1,891.93
100-610-5217.000 PERS Tier 3 (2%@62) 459.55
100-710-5205.000 Health Insurance 3,330.00
100-710-5215.000 PERS Tier 1 (2.5%@55) 370.10
100-710-5217.000 PERS Tier 3 (2%@62) 281.18
100-710-5415.000 Communications 25.93
100-710-5705.000 General Maintenance 154.18
100-730-5205.000 Health Insurance 5,336.45
100-730-5215.000 PERS Tier 1 (2.5%@55) 901.61
100-730-5217.000 PERS Tier 3 (2%@62) 840.66
100-730-5345.000 Contractual Services 1,234.80
100-730-5415.000 Communications 107.19
100-730-5420.000 Mileage Reimbursement 14.06
100-730-5425.000 Dues and Memberships 350.00
100-730-5515.000 Uniform Expense 55.13
100-730-5755.000 Special Department Supp… 825.60
100-735-5755.000 Special Department Supp… 17,122.11
100-740-5205.000 Health Insurance 4,839.65
100-740-5215.000 PERS Tier 1 (2.5%@55) 408.45
100-740-5216.000 PERS Tier 2 (2%@60) 339.70
100-740-5217.000 PERS Tier 3 (2%@62) 320.48
100-740-5350.000 Tree Trimming Contract 10,868.00
100-740-5405.000 Utilities 5,075.57
100-740-5415.000 Communications 89.30
100-740-5435.000 Training and Education 300.00
100-740-5705.000 General Maintenance 5,771.10
100-740-5710.000 Equipment Maintenance 565.66
Tuesday, October 20, 2026 Reg CC MTG, Page *28
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 13 of 14
Account Summary
Account Number Account Name Payment Amount
100-740-5720.000 Fuel 1,363.88
100-750-5405.000 Utilities 315.93
100-750-5755.000 Special Department Supp… 50.40
205-610-5205.000 Health Insurance 1,440.07
205-610-5217.000 PERS Tier 3 (2%@62) 410.84
205-610-5335.000 Maintenance & License … 169.83
205-610-5405.000 Utilities 2,269.25
205-610-5415.000 Communications 64.82
205-610-5705.000 General Maintenance 1,074.18
205-610-5710.000 Equipment Maintenance 2,560.15
205-610-5720.000 Fuel 1,673.85
205-620-5350.000 Tree Trimming Contract 15,009.00
205-620-5510.000 Small Tools 127.49
205-620-5705.000 General Maintenance 891.08
209-810-5806.344 SB Local Travel Network… 63.68
215-570-5340.007 PLHA Year 4 1,585.00
215-575-5340.346 City Hall 2nd Floor 1,697.50
220-340-5205.000 Health Insurance 356.21
220-340-5217.000 PERS Tier 3 (2%@62) 64.03
220-340-5345.000 Contractual Services 548.33
255-760-5205.000 Health Insurance 209.88
255-760-5217.000 PERS Tier 3 (2%@62) 53.13
255-760-5335.163 Official/Score Keeper 210.00
255-760-5506.000 Sport Supplies 304.55
257-830-5345.102 Lomita Park Maintenance 25,818.30
510-110-5217.000 PERS Tier 3 (2%@62) 7.61
510-120-5305.000 Legal Services 1,620.75
510-125-5205.000 Health Insurance 1,128.68
510-125-5215.000 PERS Tier 1 (2.5%@55) 115.77
510-125-5216.000 PERS Tier 2 (2%@60) 378.59
510-125-5217.000 PERS Tier 3 (2%@62) 85.06
510-130-5205.000 Health Insurance 293.02
510-130-5216.000 PERS Tier 2 (2%@60) 112.89
510-130-5217.000 PERS Tier 3 (2%@62) 106.10
510-220-5205.000 Health Insurance 3,265.79
510-220-5215.000 PERS Tier 1 (2.5%@55) 98.31
510-220-5216.000 PERS Tier 2 (2%@60) 667.92
510-220-5217.000 PERS Tier 3 (2%@62) 329.51
510-220-5710.000 Equipment Maintenance 82.50
510-230-5205.000 Health Insurance 29.42
510-230-5217.000 PERS Tier 3 (2%@62) 346.81
510-440-5345.000 Contractual Services 9,848.48
510-440-5415.000 Communications 1,839.99
510-630-5205.000 Health Insurance 12,114.40
510-630-5215.000 PERS Tier 1 (2.5%@55) 825.39
510-630-5216.000 PERS Tier 2 (2%@60) 59.95
510-630-5217.000 PERS Tier 3 (2%@62) 3,088.59
510-630-5338.000 Underground Service Ale… 63.30
510-630-5340.000 Professional Services 15,620.00
510-630-5345.000 Contractual Services 3,271.06
510-630-5405.000 Utilities 126.05
510-630-5415.000 Communications 427.99
510-630-5435.000 Training and Education 642.09
510-630-5440.000 Water Purchases - MWD 404,742.40
510-630-5442.000 Utilities - CWPF 3,838.62
510-630-5443.000 Water Production Supply… 365.50
510-630-5510.000 Small Tools 75.11
510-630-5705.000 General Maintenance 5,688.24
Tuesday, October 20, 2026 Reg CC MTG, Page *29
Warrant Register Payment Dates: 10/7/2026 - 10/20/2026
10/12/2026 3:23:03 PM Page 14 of 14
Account Summary
Account Number Account Name Payment Amount
510-630-5710.000 Equipment Maintenance 385.68
510-630-5720.000 Fuel 1,047.71
510-630-5755.000 Special Department Supp… 196.52
520-840-5821.333 Zone G Pipe Replacement 1,266.07
720-990-5998.000 Transfer to Railroad Mus… 1,079.00
Grand Total: 1,152,649.00
Project Account Summary
Project Account Key Payment Amount
**None** 1,125,500.95
Lomita Park Maintenance 25,818.30
SB Local Travel Network & Safety Enhancements 63.68
Zone G Pipe Replacement 1,266.07
Grand Total: 1,152,649.00
Tuesday, October 20, 2026 Reg CC MTG, Page *30
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Susan Kamada, Deputy City Manager/Administrative Services Director
MEETING DATE: October 20, 2026
SUBJECT: September 2026 Treasury and Investment Report

RECOMMENDATION
Receive and file the Treasury and Investment Report.

BACKGROUND
Pursuant to Section 41004 of the Government Code of the State of California, the City Treasurer is required to submit a monthly report of all receipts, disbursements and fund balances. The first page of the report summarizes the investment activity for the month and distribution by type of investment, held by the City. The second and third page lists all investments with original maturities exceeding one year as of the month ended September 30, 2026. The fourth page of the report provides a summary of the beginning balance, total receipts, total disbursements, the ending balance for all funds, and a listing, by fund, of all month end fund balances.

In summary, all investments of the City of Lomita are in compliance with both the Government Code and our Investment Policy. In addition, the City has sufficient liquidity to meet its expenditure requirements for the ensuing six months.

9.67% of the City’s funds are with the State of California Local Agency Investment Fund (LAIF). The remaining funds of the City of Lomita are in active checking accounts, money market funds, U.S. Treasuries, Federal Agency Securities, Corporate Bonds, and FDICinsured Negotiable Certificates of Deposit that are in compliance with the California Government Code and the City’s Investment Policy. The current value of each account is obtained from actual monthly statements for the period ending September 30, 2026.

CITY OF LOMITA

CITY COUNCIL REPORT
Item No. 7d
Tuesday, October 20, 2026 Reg CC MTG, Page *31
2 VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 6: High Performing Organization – Strengthening City services through innovation and excellence.

OPTIONS:

None, information only.

FISCAL IMPACT
None.

ATTACHMENT

1. Treasury and Investment Report for September 2026
Approved by:

Andrew Vialpando
City Manager
Prepared by:

Susan Kamada
Administrative Services Director
Tuesday, October 20, 2026 Reg CC MTG, Page *32
City of Lomita
Investment Portfolio Report September 30, 2026
Summary of Cash & Investments Book Value Market Value* Interest Earned Gain (Loss) on
Investment
Local Agency Investment Fund (LAIF) 3,286,729.39 3,286,729.39 0.00 0.00 Certificate of Deposit - Negotiable 16,304,000.00 16,008,292.22 50,934.07 0.00 Federal Agency Securities 6,150,000.00 5,979,287.00 12,187.50 0.00 Commercial Paper 4,000,000.00 3,814,225.00 20,500.00 0.00 US Treasuries 1,550,000.00 1,456,670.50 0.00 0.00
Net Cash Equivalents 2,664.64 2,664.64 0.00 0.00
Total Pooled Investments 31,293,394.03 30,547,868.75 83,621.57 0.00 City of Lomita General Account DDA 2,712,884.26 2,499,609.86 0.00 0.00 Total Cash 2,712,884.26 2,499,609.86 0.00 0.00
Total Cash & Investments 34,006,278.29 33,047,478.61 83,621.57 0.00 City of Lomita
Distribution of Pooled Cash
Local Agency Investment Fund (LAIF) 3,286,729.39 9.67% MTD YTD Certificate of Deposit - Negotiable 16,304,000.00 47.94% Jul-26 118,124.11 118,124.11 Federal Agency Securities 6,150,000.00 18.08% Aug-26 54,744.98 172,869.09 Commerical Paper 4,000,000.00 11.76% Sep-26 83,621.57 256,490.66 US Treasuries 1,550,000.00 4.56% Oct-26 - 256,490.66
Cash on Hand 2,712,884.26 7.98% Nov-26 - 256,490.66
Total Cash & Investments 34,003,613.65 99.99% Dec-26 - 256,490.66 Jan-27 - 256,490.66
Feb-27 - 256,490.66
Mar-27 - 256,490.66
Apr-27 - 256,490.66
May-27 - 256,490.66
Jun-27 - 256,490.66
256,490.66 256,490.66
*The Governmental Accounting Standards Board (GASB) has established Statement No. 31 for setting investment valuation standards. We report the unrealized gain/(loss) monthly and book realized gain/(loss) at year end as a GASB 31 requirement.

GASB 31 is a reporting requirement that reports the "Fair Value" of investments held in our portfolio. Fair value is the amount at which a financial instrument (investment) could be exchanged in a current transaction between willing parties at current market prices. It is important to understand the relationship between prevailing interest rates and fixed coupon investments. As market interest rates fall, the "Fair Value" of held securities will rise (unrealized Gains). The opposite occurs as market interest rates rise (market prices of held investments will fall). It should be noted that investments held in the city pool are to be held until maturity so both gains and losses (unrealized) will not be taken.

Month to Date & Fiscal Year to Date
Interest Earned/ Gain (Loss) on Total Investments
Distribution of Cash &
Invesments

9.6651%

47.9441%

18.0849%

11.7625%

4.5580%

92.02%

7.98%

7.98%
100.00%

0.0078%
Local Agency Investment
Fund (LAIF), 10%
Certificate of
Deposit -
Negotiable, 48%
Federal Agency
Securities, 18%
Commerical
Paper, 12%
U.S. Treasuries 7%
Cash on Hand,
8%
Tuesday, October 20, 2026 Reg CC MTG, Page *33
City of Lomita
Investment Portfolio Report
September 30, 2026
Account/ Investment Title &
Description
Account #/
CUSIP
Settlement
Date
Maturity
Date
Yield to
Maturity
Beginning Face
Amount/Shares
Beginning
Market Value Buy Principal Sell Principal Change in Market Value Current MP Current Market Value
Ending Market
Value
Ending Face
Amount/Shares
Interest
Earned /
(Accrued)
Local Agency Investment Fund (LAIF)
City of Lomita XX-XX-469 N/A 3.863% 3,286,729.39 3,286,729.39 - - - 100.0000 3,286,729.39 3,286,729.39 3,286,729.39 0.00 Sub Total / Average 3,286,729.39 3,286,729.39 - - - 100.00 3,286,729.39 3,286,729.39 3,286,729.39 - Certificate of Deposit - Negotiable
Texas Exchange Bank 88241TML1 11/26/21 11/27/26 1.200% 249,000.00 247,386.48 - - 473.10 99.5420 247,859.58 247,859.58 249,000.00 253.78 Beal Bank USA 07371CH69 03/02/22 02/24/27 2.050% 248,000.00 245,698.56 - - 161.20 99.1370 245,859.76 245,859.76 248,000.00 2,562.89 Alabama Credit Union 01025RAP4 02/28/24 03/01/27 4.500% 248,000.00 248,667.12 - - (339.76) 100.1320 248,327.36 248,327.36 248,000.00 947.84 Capital One Bank USA NA 14042TFP7 04/27/22 04/27/27 2.900% 248,000.00 246,204.48 - - (198.40) 99.1960 246,006.08 246,006.08 248,000.00 - Morgan Stanley Bank 61773TDN0 04/29/22 04/29/27 3.000% 246,000.00 244,359.18 - - (223.86) 99.2420 244,135.32 244,135.32 246,000.00 - Discover Bank 254673G83 06/14/22 06/14/27 3.150% 246,000.00 244,295.22 - - (450.18) 99.1240 243,845.04 243,845.04 246,000.00 - The Dart Bank 237412AN1 06/08/22 06/15/27 3.250% 249,000.00 247,506.00 - - (460.65) 99.2150 247,045.35 247,045.35 249,000.00 687.31 Forbright Bank 34520LAT0 11/02/22 11/02/27 4.600% 249,000.00 250,434.24 - - (1,182.75) 100.1010 249,251.49 249,251.49 249,000.00 972.81 True Sky FCU 89786MAP9 11/06/24 11/08/27 4.100% 249,000.00 249,034.86 - - (1,108.05) 99.5690 247,926.81 247,926.81 249,000.00 867.07 Alliant Credit Union 01882MAC6 12/30/22 12/30/27 5.000% 248,000.00 250,804.88 - - (1,495.44) 100.5280 249,309.44 249,309.44 248,000.00 1,053.15 Alaska USA Federal Credit Union 011852AE0 03/08/23 03/08/28 4.600% 249,000.00 250,603.56 - - (1,730.55) 99.9490 248,873.01 248,873.01 249,000.00 972.81 Tuscon FCU 898812AF9 04/03/25 04/03/28 4.100% 249,000.00 248,736.06 - (1,750.47) 99.1910 246,985.59 246,985.59 249,000.00 867.07 United Fidelity Bank 910286HR7 04/12/24 04/12/28 4.400% 243,000.00 243,831.06 - - (1,810.35) 99.5970 242,020.71 242,020.71 243,000.00 908.09 Valley National Bank 919853QL8 05/19/25 05/19/28 4.000% 245,000.00 244,581.05 - - (1,964.90) 99.0270 242,616.15 242,616.15 245,000.00 - Civic Federal CU 178808AB7 07/23/25 10/23/28 4.100% 249,000.00 248,093.64 - - (2,776.35) 98.5210 245,317.29 245,317.29 249,000.00 867.07 Hope Federal CU 43942MBJ0 01/14/26 01/16/29 3.550% 245,000.00 240,822.75 - (2,807.70) 97.1490 238,015.05 238,015.05 245,000.00 - Midwest Bank of Illinois 59828PDD9 01/15/26 01/16/29 3.500% 249,000.00 244,463.22 - (2,836.11) 97.0390 241,627.11 241,627.11 249,000.00 740.18 Credit Union New Jersey 22552BAF8 07/18/25 01/18/29 4.000% 249,000.00 247,237.08 - - (2,948.16) 98.1080 244,288.92 244,288.92 249,000.00 845.92 Southwest FCU 585899AG2 01/19/24 01/19/29 4.000% 249,000.00 247,234.59 - - (2,953.14) 98.1050 244,281.45 244,281.45 249,000.00 845.92 Univest Bank 91527PCP0 02/28/25 02/28/29 4.300% 249,000.00 248,825.70 - - (3,100.05) 98.6850 245,725.65 245,725.65 249,000.00 909.36 BMW Bank of North America 05612LER9 05/09/25 05/09/29 4.000% 245,000.00 242,699.45 - - (3,118.85) 97.7880 239,580.60 239,580.60 245,000.00 - SCE Federal Credit Union 78413RAS6 05/22/24 05/22/29 4.550% 249,000.00 250,190.22 - - (3,316.68) 99.1460 246,873.54 246,873.54 249,000.00 962.23 First Community Bank 31983VCS4 08/21/24 08/21/29 3.750% 249,000.00 244,493.10 - - (3,281.82) 96.8720 241,211.28 241,211.28 249,000.00 793.05 American Express National Bank 02589AGK2 02/12/25 02/12/30 4.250% 244,000.00 242,543.32 - - (3,918.64) 97.7970 238,624.68 238,624.68 244,000.00 - Morgan Stanley Private Bank 61776NLK7 02/12/25 02/12/30 4.250% 244,000.00 242,543.32 - - (3,918.64) 97.7970 238,624.68 238,624.68 244,000.00 - Truxton Trust Co 89846HDT7 02/14/25 02/14/30 4.200% 249,000.00 246,397.95 - - (3,961.59) 97.3640 242,436.36 242,436.36 249,000.00 867.07 Fidelity Bank 31617CCH4 03/30/26 04/01/30 3.800% 249,000.00 243,783.45 - (4,061.19) 96.2740 239,722.26 239,722.26 249,000.00 803.62 BNY Mellon NA 05584CXH4 05/21/25 05/21/30 3.900% 245,000.00 240,413.60 - - (4,182.15) 96.4210 236,231.45 236,231.45 245,000.00 - Poppy Bank 73319FDY2 06/17/25 06/17/30 4.000% 245,000.00 241,175.55 - - (4,304.65) 96.6820 236,870.90 236,870.90 245,000.00 - Bom Bank 09776DAV6 06/26/25 06/24/30 4.100% 249,000.00 245,997.06 - - (4,437.18) 97.0120 241,559.88 241,559.88 249,000.00 867.07 Seattle Metro Credit Union 81258MAG5 07/31/26 07/31/30 4.250% 244,000.00 242,172.44 - (4,516.44) 97.4000 237,656.00 237,656.00 244,000.00 - Hardin County Savings Bank 412022EC5 09/19/25 09/19/30 3.500% 249,000.00 240,192.87 - - (4,596.54) 94.6170 235,596.33 235,596.33 249,000.00 740.18 CFG BANK/MD 12527CNN8 11/17/25 11/14/30 4.000% 245,000.00 238,625.10 - (4,522.70) 95.5520 234,102.40 234,102.40 245,000.00 - Carter FCU 14622LBA9 01/20/26 01/20/31 3.700% 249,000.00 242,344.23 - (5,141.85) 95.2620 237,202.38 237,202.38 249,000.00 782.47 Sunwest Bank 86804DDK1 02/11/26 02/11/31 3.750% 249,000.00 241,729.20 - (5,189.16) 94.9960 236,540.04 236,540.04 249,000.00 793.05 Credit Human FCU 22537MAY3 03/27/26 03/27/31 3.800% 249,000.00 241,995.63 - (5,375.91) 95.0280 236,619.72 236,619.72 249,000.00 803.62 Merrick Bank 59013LLR3 04/30/26 04/30/31 4.000% 249,000.00 243,912.93 - (5,557.68) 95.7250 238,355.25 238,355.25 249,000.00 845.92 Bank of America 06428KAT3 05/29/26 05/29/31 4.500% 247,000.00 246,110.80 - (765.70) 99.3300 245,345.10 245,345.10 247,000.00 - Citibank 17290GDY0 05/29/26 05/29/31 4.500% 247,000.00 245,343.12 - (4,740.92) 97.4098 240,602.21 240,602.21 247,000.00 2,801.59 USF FCU 90353ECY7 05/29/26 05/29/31 4.300% 249,000.00 247,003.02 - (5,754.39) 96.8870 241,248.63 241,248.63 249,000.00 909.36 Wells Fargo Bank 949764XZ2 06/26/26 06/26/31 4.250% 249,000.00 246,373.05 - (5,846.52) 96.5970 240,526.53 240,526.53 249,000.00 898.79 Eaglemark Savings Bank 27004PJP9 07/22/26 07/22/31 4.350% 244,000.00 242,335.92 - (5,841.36) 96.9240 236,494.56 236,494.56 244,000.00 - Baxter Credit Union 07181JAU8 11/22/22 11/23/26 5.000% 248,000.00 248,627.44 - - (277.76) 100.1410 248,349.68 248,349.68 248,000.00 1,053.15 Celtic Bank 15118RZT7 11/30/22 11/30/26 4.800% 249,000.00 249,522.90 - - (246.51) 100.1110 249,276.39 249,276.39 249,000.00 1,015.10 Western Alliance Bank 95763PXR7 05/30/25 11/30/26 4.150% 244,000.00 244,026.84 - - (143.96) 99.9520 243,882.88 243,882.88 244,000.00 - Dept of Commerce Federal CU 24951TAT2 05/13/22 05/13/27 3.250% 249,000.00 247,700.22 - - (318.72) 99.3500 247,381.50 247,381.50 249,000.00 687.31 BMO Harris Bank NA 05600XFW5 06/15/22 06/15/27 3.300% 249,000.00 247,603.11 - - (470.61) 99.2500 247,132.50 247,132.50 249,000.00 697.88 Empower FCU 291916AM6 06/26/24 06/28/27 4.900% 248,000.00 249,748.40 - - (843.20) 100.3650 248,905.20 248,905.20 248,000.00 1,032.09 Numerica Credit Union 67054NBC6 11/04/22 11/04/27 4.950% 248,000.00 250,427.92 - - (1,254.88) 100.4730 249,173.04 249,173.04 248,000.00 1,042.62 University Bk Ann 914098DQ8 04/03/23 04/03/28 4.850% 248,000.00 250,564.32 - - (1,892.24) 100.2710 248,672.08 248,672.08 248,000.00 1,021.56 Customers Bank 23204HNZ7 05/31/23 05/31/28 4.450% 244,000.00 247,406.24 - - (2,222.84) 100.4850 245,183.40 245,183.40 244,000.00 - First National Bank 32110YP74 08/30/24 08/30/28 3.800% 249,000.00 246,881.01 - - (2,487.51) 98.1500 244,393.50 244,393.50 249,000.00 803.62 CoVantage Credit Union 22282XAG5 09/03/24 09/05/28 3.900% 247,000.00 245,322.87 - - (2,497.17) 98.3100 242,825.70 242,825.70 247,000.00 2,428.04 Calprivate Bank 13135NCB4 12/27/23 12/27/28 3.850% 245,000.00 242,498.55 - - (2,829.75) 97.8240 239,668.80 239,668.80 245,000.00 - Ledyark NBk/Norwich VT 523343AA9 01/02/24 12/29/28 4.050% 245,000.00 248,260.95 - - (3,106.60) 100.0630 245,154.35 245,154.35 245,000.00 - Tuesday, October 20, 2026 Reg CC MTG, Page *34
City of Lomita
Investment Portfolio Report
September 30, 2026
Account/ Investment Title &
Description
Account #/
CUSIP
Settlement
Date
Maturity
Date
Yield to
Maturity
Beginning Face
Amount/Shares
Beginning
Market Value Buy Principal Sell Principal Change in Market Value Current MP Current Market Value
Ending Market
Value
Ending Face
Amount/Shares
Interest
Earned /
(Accrued)
Spur Security Bank 85214EAA0 03/26/24 03/12/29 4.200% 244,000.00 243,131.36 - - (2,964.60) 98.4290 240,166.76 240,166.76 244,000.00 5,166.11 Malaga Bk FSB 56102ABS4 04/19/24 04/19/29 4.150% 245,000.00 243,782.35 - - (3,118.85) 98.2300 240,663.50 240,663.50 245,000.00 863.54 First Foundation Bank 32026U5S1 05/10/24 05/10/29 4.600% 244,000.00 245,373.72 - - (3,242.76) 99.2340 242,130.96 242,130.96 244,000.00 - Third Fed S&L Cleveland 88413QGX0 02/14/25 08/14/29 4.250% 244,000.00 242,919.08 - - (3,330.60) 98.1920 239,588.48 239,588.48 244,000.00 - Leaders Credit Union 52171MAN5 08/30/24 08/30/29 3.850% 249,000.00 246,231.12 - - (3,376.44) 97.5320 242,854.68 242,854.68 249,000.00 845.92 JPMorgan Chase Bank NA 46659CJZ4 11/28/25 11/28/29 4.000% 240,000.00 235,910.40 - - (3,672.00) 96.7660 232,238.40 232,238.40 240,000.00 - Optum Bank 68405VCP2 12/11/24 12/11/29 4.050% 245,000.00 242,204.55 - - (3,655.40) 97.3670 238,549.15 238,549.15 245,000.00 - First Bank of Lake 31925YCD2 02/18/25 02/18/30 4.200% 249,000.00 247,184.79 - - (4,001.43) 97.6640 243,183.36 243,183.36 249,000.00 888.21 Goldman Sachs Bk USA 38150VR27 03/04/25 03/04/30 4.300% 244,000.00 242,897.12 - - (3,913.76) 97.9440 238,983.36 238,983.36 244,000.00 5,289.12 State Bank of India - NY 856288GP4 06/29/26 06/27/31 4.350% 244,000.00 243,465.64 (6,744.16) 97.0170 236,721.48 236,721.48 244,000.00 - Utah First Fed Cr Un 91739JBT1 08/04/26 08/04/31 4.400% 249,000.00 247,909.38 - (6,038.25) 97.1370 241,871.13 241,871.13 249,000.00 930.51 Sub Total / Average 16,304,000.00 16,196,795.34 - - (188,503.13) 16,008,292.22 16,008,292.22 16,304,000.00 50,934.07 Federal Agency Securities
Federal Home LN BKS 3130AR2B6 03/08/22 03/08/27 2.375% 500,000.00 495,580.00 - 85.00 99.1330 495,665.00 495,665.00 500,000.00 5,937.50 Federal Home LN BKS 3130ARDY4 03/29/22 03/29/27 2.500% 500,000.00 495,610.00 - - (95.00) 99.1030 495,515.00 495,515.00 500,000.00 6,250.00 Federal Home LN BKS 3130ARGQ8 04/14/22 04/14/27 2.875% 250,000.00 248,062.50 - - (172.50) 99.1560 247,890.00 247,890.00 250,000.00 - Federal Home LN BKS 3130ASD22 06/29/22 06/29/27 3.590% 250,000.00 249,175.00 - - (482.50) 99.4770 248,692.50 248,692.50 250,000.00 - Federal Farm Credit Bank 3133EPC45 11/16/23 11/13/28 4.625% 500,000.00 502,420.00 - - (5,470.00) 99.3900 496,950.00 496,950.00 500,000.00 - Federal Home LN BKS 3130B3FQ1 10/25/24 10/15/29 4.200% 300,000.00 296,343.00 - - (4,239.00) 97.3680 292,104.00 292,104.00 300,000.00 - Federal Home LN BKS 3130B3ES8 10/25/24 10/23/29 4.300% 100,000.00 99,372.00 - - (1,494.00) 97.8780 97,878.00 97,878.00 100,000.00 - Federal Home LN BKS 3130ATUT2 12/20/24 12/14/29 4.500% 500,000.00 500,500.00 - - (8,640.00) 98.3720 491,860.00 491,860.00 500,000.00 - Federal Home LN BKS 3130B8MQ2 11/19/25 11/15/30 3.750% 250,000.00 242,622.50 - (4,872.50) 95.1000 237,750.00 237,750.00 250,000.00 - Federal Agric MTG 31424W6H0 01/13/26 01/13/31 4.080% 500,000.00 490,990.00 - (9,305.00) 96.3370 481,685.00 481,685.00 500,000.00 - Federal Agric MTG 31424W6J6 01/13/26 01/13/31 3.930% 500,000.00 489,030.00 - (9,680.00) 95.8700 479,350.00 479,350.00 500,000.00 - Fannie Mae 3136GAXV6 10/30/25 10/30/30 3.750% 750,000.00 727,687.50 - (14,377.50) 95.1080 713,310.00 713,310.00 750,000.00 - Federal Home LN BKS 3130B8HA3 11/05/25 11/01/30 3.770% 250,000.00 242,182.50 - - (4,825.00) 94.9430 237,357.50 237,357.50 250,000.00 - Freddie Mac 3134HCM63 05/12/26 05/12/31 4.100% 500,000.00 491,540.00 - (13,555.00) 95.5970 477,985.00 477,985.00 500,000.00 - Fannie Mae 3136GDBX0 05/27/26 05/27/31 4.500% 500,000.00 494,730.00 - (9,435.00) 97.0590 485,295.00 485,295.00 500,000.00 Sub Total / Average 6,150,000.00 6,065,845.00 - - (86,558.00) 1,459.89 5,979,287.00 5,979,287.00 6,150,000.00 12,187.50 Commercial Paper
Toyota Motor Credit Corp 89236TNJ0 11/20/25 05/15/30 4.800% 500,000.00 498,170.00 - (9,790.00) 97.6760 488,380.00 488,380.00 500,000.00 - Deere John Cap Corp 24422EYF0 11/21/25 10/15/30 4.375% 500,000.00 491,495.00 - (11,120.00) 96.0750 480,375.00 480,375.00 500,000.00 - United Health Group Inc 91324PFP2 01/30/26 01/15/31 4.600% 500,000.00 488,705.00 - (11,600.00) 95.4210 477,105.00 477,105.00 500,000.00 - Apollo Global Mgmt Inc 03769MAF3 01/30/26 01/15/31 4.650% 500,000.00 493,935.00 (11,730.00) 96.4410 482,205.00 482,205.00 500,000.00 - Bank of Montreal BMO 06376JWP2 03/12/26 03/12/31 4.000% 1,000,000.00 950,640.00 - (23,740.00) 92.6900 926,900.00 926,900.00 1,000,000.00 20,500.00 JP Morgan Chase Bank 46632FG74 06/05/26 06/04/31 4.800% 500,000.00 492,430.00 - (13,380.00) 95.8100 479,050.00 479,050.00 500,000.00 JP Morgan Chase Bank 46632FH81 06/04/26 06/05/31 4.700% 500,000.00 493,690.00 - (13,480.00) 96.0420 480,210.00 480,210.00 500,000.00 Sub Total / Average 4,000,000.00 3,909,065.00 - - (94,840.00) 3,814,225.00 3,814,225.00 4,000,000.00 20,500.00 U.S. Treasuries
US Treasury Note 91282CDL2 12/03/24 11/30/28 1.500% 1,100,000.00 1,032,922.00 - - (9,273.00) 93.0590 1,023,649.00 1,023,649.00 1,100,000.00 - US Treasury Note 91282CMZ1 05/15/25 04/30/30 3.875% 450,000.00 441,247.50 - - (8,226.00) 96.2270 433,021.50 433,021.50 450,000.00 - Sub Total / Average 1,550,000.00 1,474,169.50 - - (17,499.00) 1,456,670.50 1,456,670.50 1,550,000.00 - Net Cash Equivalents*
Stifel XXXX4891 N/A N/A - N/A N/A N/A N/A 100.0000 - - - - Multibank Securities Inc XXXXX5544 N/A N/A 2,664.64 N/A N/A N/A N/A 100.0000 2,664.64 2,664.64 2,664.64 - Sub Total / Average 2,664.64 - - - - 2,664.64 2,664.64 2,664.64 - Total / Average - Investments 31,293,394.03 30,932,604.23 - - (387,400.13) 1,559.89 30,545,204.11 30,547,868.75 31,293,394.03 83,621.57 Tuesday, October 20, 2026 Reg CC MTG, Page *35
City of Lomita
Investment Portfolio Report
September 30, 2026
Account/ Investment Title &
Description
Account #/
CUSIP
Settlement
Date
Maturity
Date
Yield to
Maturity
Beginning Face
Amount/Shares
Beginning
Market Value Buy Principal Sell Principal Change in Market Value Current MP Current Market Value
Ending Market
Value
Ending Face
Amount/Shares
Interest
Earned /
(Accrued)
Demand Deposit Account (DDA)
Pacific Western - General Account XXXX259 N/A N/A 2,761,615.17 N/A N/A N/A N/A 100.0000 2,548,340.77 2,548,340.77 N/A (Outstanding Debits & Checks) N/A N/A (48,730.91) N/A N/A N/A N/A 100.0000 (48,730.91) (48,730.91) N/A Sub Total / Average 2,712,884.26 - 2,499,609.86 2,499,609.86 - Total /Cash & Investments 34,006,278.29 30,932,604.23 - - (387,400.13) 1,559.89 30,545,204.11 33,047,478.61 33,793,003.89 83,621.57 Tuesday, October 20, 2026 Reg CC MTG, Page *36
City of Lomita
Investment Portfolio Report
September 30, 2026
Realized Gain
/(Loss) On
Investment
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Tuesday, October 20, 2026 Reg CC MTG, Page *37
City of Lomita
Investment Portfolio Report
September 30, 2026
Realized Gain
/(Loss) On
Investment
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
N/A
N/A
-
-
Tuesday, October 20, 2026 Reg CC MTG, Page *38
City of Lomita
Investment Portfolio Report
September 30, 2026
Realized Gain
/(Loss) On
Investment
N/A
N/A
-
-
Tuesday, October 20, 2026 Reg CC MTG, Page *39
City of Lomita
Investment Portfolio Report September 30, 2026
Previous Balance $ 2,548,340.77
Deposits 1,906,738.62
Disbursements (1,617,604.56)
Adjustments (75,859.66)
Current Balance 2,761,615.17
General Fund - City Operations
General Fund - City Operations including LAIF and Investments 100 7,313,047.78 Sub Total - General Fund - City Operations including LAIF and Investments 7,313,047.78 Special Revenue Funds
OPEB Trust Fund - Retiree Health Care 201 282,060.85
Pension Stabilization Fund 202 1,480,565.46
Economic Development 203 746,506.98
General Plan Update 204 662,550.70
Gas Tax Fund - Street Maintenance 205 1,993,223.12
Measure R Local Fund - Street Projects 207 1,323,096.67 Measure R Highway Fund - Street Projects 208 0.16
Measure M Fund - Street Projects 209 1,511,361.63
Economic Stabilization 210 500,000.00
Measure W Fund - Safe Clean Water Program 211 56,215.75 American Rescue Plan 212 -
CDBG Fund - Housing Programs 215 (3,334.68)
Proposition A Fund - Transportation Projects 220 851,546.93 Proposition C Fund - Transportation Projects 225 3,916,320.55 Transportation Development Act Article 3- Transportation Projects 230 - Air Quality Fund - Air Quality Projects 235 137,617.69
Landscape Maintenance Fund - Landscape Maintenance District 245 7,181.00 Park Facilities Fee Fund - Quimby Funds 250 375,684.25
Park Athletic Fund - Park Athlete Programs 255 179,480.45 Park Grant Fund - Park Improvement Programs 257 (411,388.64) Lomita Manor Fund - Federal Housing Program 260 197,505.04 CA Law Enf. Equip. Program (CLEEP) Fund - Public Safety Equip. 276 6,983.02 Sub Total - Special Revenue Funds 13,813,176.93
Capital Improvement Funds
Capital Improvement Fund - Capital Improvement Projects 310 111,652.82 Street Improvement Fund - Street Improvement Projects 311 1,827,842.70 Facilities Improvement Fund - Facilities Improvement Projects 312 3,246,948.23 Stephenson Center Fund - Facilities Improvement Projects 313 85,744.47 Sub Total - Capital Improvement Funds 5,272,188.22

GENERAL LEDGER CASH BALANCES
Tuesday, October 20, 2026 Reg CC MTG, Page *40
City of Lomita
Investment Portfolio Report September 30, 2026
Previous Balance $ 2,548,340.77
Deposits 1,906,738.62
Disbursements (1,617,604.56)
Adjustments (75,859.66)
Current Balance 2,761,615.17
Proprietary Funds
Water Operations Fund - Water Operations 510 2,483,631.24 Water Capital Fund - Water Capital Projects 520 1,682,167.22 Rate Stabilization - Cypress Reservoir Bond 530 125,000.00 Internal Service Fund - Equipment Replacement 610 1,689,075.00 PK Equipment Replacement Fund 611 907,989.21
Sewer Replacement Fund 612 714,879.62
Sub Total - Proprietary Funds 7,602,742.29
Trust and Agency Funds
Museum Foundation Fund - Railroad Museum Programs 720 1,209.06 Tom Rico Memorial Fund - Park Program Scholarships 730 1,249.37 Sub Total - Trust & Agency Funds 2,458.43
Total 34,003,613.65
Pooled Cash 999 (31,241,998.48)
Grand Total 2,761,615.17
Tuesday, October 20, 2026 Reg CC MTG, Page *41
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Adrian Fernandez, Community and Economic Development Director
MEETING DATE: October 20, 2026
SUBJECT: Second Reading of Ordinance No. 901 Amending the Construction and Demolition Waste Management Chapter

RECOMMENDED ACTION
Adopt Ordinance No. 901 and find the action to be categorically exempt from the California Environmental Quality Act.

BACKGROUND
At its meeting on October 6, 2026, the City Council introduced on first reading and held a public hearing regarding the attached ordinance to update the diversion percent to 65, establish a self-haul permit process and deposit, revise reporting requirements and add penalties for non-compliance.

ENVIRONMENTAL REVIEW
The City Council finds that adoption of the ordinance and resolution is not subject to CEQA pursuant to CEQA Guidelines Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) because the actions will not result in physical change to the environment, directly or indirectly, and therefore do not constitute a project as defined in Section 15378 and will not result in a direct or reasonably foreseeable indirect physical change in the environment. Alternatively, the adoption of the ordinance and resolution is exempt from CEQA because it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment [State CEQA Guidelines, § 15061(b)(3)].

CITY OF LOMITA

CITY COUNCIL REPORT
Item No. 7e
Tuesday, October 20, 2026 Reg CC MTG, Page *42
2 FISCAL IMPACT
There is no fiscal impact associated with the draft ordinance and resolution. While $131 will not cover the total cost to the City Manager to consider an appeal to the waste management plan or self-hauler permit, these appeals are extremely rare (less than one per year) and staff suggests that the appeal fee not exceed the self-hauling permit fee.

The $1,000 deposit fee will be fully refunded back to the applicant after it is demonstrated that the project is fully in compliance with LMC Chapter 5. However, the deposit fee will be forfeited and will instead serve as a fine should the developer not comply.

OPTIONS

1. Adopt the attached ordinance.

2. Do not adopt the ordinance.

3. Provide staff with further direction.

ATTACHMENT

1. Ordinance and Exhibit A
Approved by:
______________________
Andrew Vialpando
City Manager
Prepared by:
__________________________
Adrian Fernandez, Community and Economic Development Director Tuesday, October 20, 2026 Reg CC MTG, Page *43
ORDINANCE NO. 901

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, AMENDING CHAPTER 5 (CONSTRUCTION AND DEMOLITION

WASTE MANAGEMENT) OF TITLE V (SANITATION AND HEALTH) OF THE

LOMITA MUNICIPAL CODE TO ESTABLISH A CONSTRUCTION AND
DEMOLITION HAULING PERMIT AND A DEPOSIT FOR NON-CITYFRANCHISED WASTE HAULERS, AND FINDING THE ACTION IS NOT

SUBJECT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

THE CITY COUNCIL OF THE CITY OF LOMITA DOES HEREBY ORDAIN AS FOLLOWS:

Section 1. Recitals.

A. Pursuant to Lomita Municipal Code (LMC) Section 5-5, a waste management plan is required in order to remove construction and demolition waste from construction, remodeling, or demolition projects in the City of Lomita that meet the applicability requirements of LMC Section 5-5;
B. Permitted haulers are currently required to divert 50 percent of all construction and demolition waste generated by a project and to submit reports with the disposal amount and location to the City on a quarterly basis and at the completion of the project;
C. The proposed code amendment updates the City’s diversion requirement to 65 percent and establishes additional recordkeeping and reporting requirements for self-haulers;
D. City staff is frequently unable to obtain the required documentation from the self-haulers (other than the City-franchised waste haulers), and the California Department of Resources Recycling and Recovery (CalRecycle) encouraged staff to improve its current process; and
E. The proposed code update intends to address this matter by requiring a hauling permit and authorizing the collection of a deposit fee with the selfhaulers to be refunded upon completion of the reporting requirements. A separate City Council-adopted resolution is expected to establish the hauling permit appeal fee and hauling permit deposit amount.

Section 2. Incorporation. The recitals above are true and correct and are each incorporated by reference and adopted as findings by the City Council.

Section 3. CEQA. The City Council finds that adoption of this Ordinance does not constitute a “project” under the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines sections 15060(c)(2), 15060(c)(3), and 15378 because the Ordinance will not have the potential to result in either a direct physical change in the Tuesday, October 20, 2026 Reg CC MTG, Page *44
Ordinance No. 901

Page 2 of 2 ends

environment or a reasonably foreseeable indirect physical change in the environment and therefore does not constitute a project within the meaning of State CEQA Guidelines section 15378. Alternatively, the City Council finds that, pursuant to State CEQA Guidelines section 15061(b)(3), the adoption of this Ordinance is exempt from CEQA because there is no possibility that it may have a significant effect on the environment.

Section 4. General Plan. The City Council hereby finds that the adoption of the Ordinance is consistent with the City of Lomita General Plan.

Section 5. Code Amendment. Lomita Municipal Code (LMC) Title V (Sanitation and Health) Chapter 5 (Construction and Demolition Waste Management) is hereby amended to read in its entirety as provided in Exhibit A, attached hereto and incorporated herein by reference.

Section 6. Custodian of Records. The custodian of records for this Ordinance is the City Clerk and the records comprising the administrative record are located at 24300 Narbonne Avenue, Lomita, CA 90717.

Section 7. Severability. If any provision of this Ordinance or its application to any person or circumstance is held to be invalid by a court of competent jurisdiction, such invalidity has no effect on the other provisions or applications of the Ordinance that can be given effect without the invalid provision or application, and to this extent, the provisions of this Ordinance are severable. The City Council declares that it would have adopted this Ordinance irrespective of the invalidity of any portion thereof.

Section 8. Effective Date. This ordinance shall take effect thirty (30) days after the date of its passage and adoption; and within fifteen (15) days after its passage and adoption, the City Clerk shall cause a copy of this ordinance to be published in accordance with the provisions of the law. The City Clerk shall certify the adoption of this ordinance.

PASSED, APPROVED AND ADOPTED this 20th day of October, 2026.

Cindy Segawa, Mayor
ATTEST:

Kathleen Horn Gregory, MMC, City Clerk
APPROVED AS TO FORM:

Trevor Rusin, City Attorney
Tuesday, October 20, 2026 Reg CC MTG, Page *45
Exhibit A
CHAPTER 5. - CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT Sec. 5-5.01. - Purpose.

The purpose of this chapter is to set forth requirements for the diversion of construction and demolition debris that will ensure compliance with CALGreen and will allow the city to better document diversion efforts in compliance with AB 939.

Sec. 5-5.02. - Definitions.

City-franchised waste hauler means the company or individual that the City of Lomita has contracted exclusively to provide waste collection and disposal services within the city, pursuant to title V, chapter 3 of this Code.

City-initiated project means any construction, deconstruction, demolition, remodeling, repair, cleanup, or removal project performed on behalf of the city via contract with the city.

Construction and demolition (C&D) debris means building materials and solid waste from construction, deconstruction, remodeling, repair, cleanup, removal, or demolition operations that are not "hazardous waste" (as defined in Public Resources Code Section 40141), including, but not limited to:
(1) Discarded materials generally considered to be water insoluble including asphalt, brick, concrete, glass, gravel, gypsum, masonry, metal, pipe, rock, sand, slate, soil, steel, stone, wallboard or otherwise inert material. (2) Clean cardboard, construction paper, plastics (including, but not limited to, sheeting, molding, and shrink wrap), wood, and lighting and piping fixtures. (3) Rocks, soils, trees, brush, and other vegetative matter that normally results from land clearing, landscaping and development operations for a construction project.

Conversion rate means the rate set forth in the standardized conversion rate table approved by the community development director or designee for use in estimating the volume or weight of materials identified in a waste management plan.

Deconstruction means the careful and systematic dismantling of a structure in order to salvage materials for diversion.

Demolition means the decimating, razing, ruining, tearing down or wrecking of any facility, structure, pavement or building, whether in whole or in part, whether interior or exterior, and any removal of the same.

Dispose means the final deposition of construction and demolition or inert material to a Class III landfill.

Diversion requirement means the diversion via reuse or recycling of at least sixtyfive (65) percent of all construction and demolition debris generated by a project.

Tuesday, October 20, 2026 Reg CC MTG, Page *46

Page 2 of 10 ends

Divert means to use material for any purpose other than disposal in a landfill or transformation facility.

Project means any activity which requires an application for a building or demolition permit or any similar permit from the city.

Recycling means the process of collecting, sorting, cleansing, treating, and reconstituting materials for the purpose of using the altered form in the manufacture of a new product. Recycling does not include burning, incinerating, or thermally destroying solid waste.

Renovation means any change, addition, and/or modification in an existing structure.

Reuse means the use, in the same or similar form as it was produced, of a material which might otherwise be discarded.

Salvage means the controlled removal of C&D debris from a permitted building or demolition site for the purpose of recycling, reuse, or storage for later recycling or reuse.

Transformation facility means a facility whose principal function is to convert, combust, or otherwise process solid waste by incineration, pyrolysis, destructive distillation, gasification, or to chemically or biologically process solid waste for the purpose of volume reduction, synthetic fuel production, or energy recovery.

Transformation facilities do not include biomass conversion or composting facilities. (Title 14, California Code of Regulations, Section 18720) Waste management plan or WMP means a written plan for disposal, recycling and reuse of project C&D debris prepared and submitted pursuant to section 5-5.03(A) in a form prescribed by the WMP compliance official.

WMP compliance official or official means the Community and Economic Development Director or designee.

WMP compliance report means the written documentation of the actual C&D debris generated from the project, (1) indicating the weight and final destination of the debris, (2) listing whether the debris was disposed of, recycled or reused, and (3) including all required receipts, pursuant to section 5-5.05(F) in a form prescribed by the WMP compliance official. The Quarterly WMP compliance report shall indicate whether the applicant complied with the diversion requirement.

Sec. 5-5.03. - Applicability.
(A) Covered projects. Covered project shall mean any of the following construction, demolition, or renovation projects:

Tuesday, October 20, 2026 Reg CC MTG, Page *47

Page 3 of 10 ends

(1) Construction of new residential units, and additions or alterations of existing residential buildings where the addition or alteration increases the building's conditioned area, volume or size.
(2) Construction of nonresidential buildings and nonresidential additions where the addition or alteration increases the building's conditioned area, volume or size.
(3) All nonresidential interior renovation projects greater than seven hundred fifty (750) square feet requiring a building permit.
(4) All demolition projects requiring a demolition permit. (5) All city-initiated projects requiring a building permit.

Every covered project shall divert at least sixty-five (65) percent, measured by weight, of all construction or demolition waste generated by the covered project and comply with all of the provisions in this chapter. All phases of a project and all related projects taking place on single or adjoining parcels, as determined by the WMP compliance official, will be deemed a single, covered project. Compliance with the provisions of sections 5-5.04 and 5-5.05 shall be listed as a condition of approval on any building or demolition permit issued for a covered project. (B) Non-covered projects. Non-covered project shall mean any project that is not a covered project as defined in this section, including:
(1) Any construction, remodeling, or demolition project that does not generate recyclable materials or construction/demolition waste.
(2) Projects for which only a plumbing, electrical, or mechanical permit is required.
(3) Immediate or emergency construction, repair, or demolition work required to protect the public health or safety in an emergency, as defined in Section 21060.3 of the Public Resources Code, as it may be amended from time to time.

Non-covered projects are exempt from the requirements of this chapter. Each applicant for a non-covered project is encouraged to divert at least sixty-five (65) percent of all project-related C&D debris.
(C)Infeasible exemption.
(1) Application. If an application for a covered project experiences unique circumstances that the applicant believes make it infeasible to comply with the diversion requirement, the applicant may apply for an exemption at the time that the waste management plan (WMP) is submitted. An applicant applying for an exception must indicate on the WMP the specific circumstances that make it infeasible to comply with the diversion requirement.

Tuesday, October 20, 2026 Reg CC MTG, Page *48

Page 4 of 10 ends

(2) Meeting with the official. The official will review the information supplied by the applicant and may meet with the applicant to discuss possible ways of meeting the diversion requirement.
(3) Granting of exemption. The official will issue an infeasibility exemption if the following findings are made:
a. Circumstances exist which are unique to the project such that compliance with the provisions of this article would create an unusual burden on the project which is different than that of similarly situated projects; or b. That diversion of one or more substances involved in the project presents unique and burdensome obstacles and would create an especially onerous economic burden on the project unless diversion of that substance is reduced or eliminated.

If the official is able to make one or more of the above findings for a project, the official may excuse the project from compliance with this article, or determine the maximum feasible reduced diversion rate for each material and indicate this rate on the WMP submitted by the applicant. (4) Denial of exemption. If the official determines that it is possible for the applicant to meet the diversion requirement, the official will so inform the applicant in writing. The applicant will have thirty (30) days to resubmit a WMP. If the applicant fails to resubmit the WMP, or to meet the WMP requirements, the official will find for noncompliance in accordance with section 5-5.5(G).

Sec. 5-5.04. - Waste management plan.
(A) Submittal of waste management plan.
(1) Applicants for building or demolition permits involving any covered project shall complete and submit a waste management plan (WMP), on a WMP form approved by the city for this purpose as part of the application packet for the building or demolition permit.
a. Contracting with the city-franchised waste hauler. Applicants intending to contract with the city-franchised waste hauler for collection of all C&D debris shall not be required to provide further information within the WMP other than their intent to utilize the services of the franchise waste hauler. b. Self-haul. A licensed contractor performing work within the scope of the contractor's license, intending to remove C&D debris from the jobsite using equipment owned or leased by the contractor, and not through a solid waste enterprise, shall include the following information in the WMP:

Tuesday, October 20, 2026 Reg CC MTG, Page *49

Page 5 of 10 ends

1. The estimated volume or weight of project C&D debris, by materials type, that will be generated;

2. The maximum volume or weight of such materials that can feasibly be diverted via reuse or recycling;

3. The estimated volume or weight of C&D debris that will be landfilled;

4. The processing facility that the applicant proposes to use to receive that material; and

5. Any special or specific activities that the applicant will use to comply with the provisions of this chapter.
(2) Calculating volume and weight of debris. In estimating the volume or weight of materials identified in the WMP, the applicant shall use the standardized conversion rates approved by the city for this purpose. (3) Deconstruction. In preparing the WMP, applicants for building or demolition permits involving the removal of all or part of an existing structure shall consider deconstruction, to the maximum extent feasible, and shall make the materials generated thereby available for salvage prior to landfilling. (B) Waste management plan review.
(1) Approval. Notwithstanding any other provision of this Code, no building, encroachment, or demolition permit shall be issued for any covered project unless and until the WMP compliance official has approved the WMP. The WMP compliance official shall only approve a WMP if he or she first determines that:
a. The WMP indicates the applicant's intent to use the city-franchised waste hauler; or
b. The WMP meets all of the following conditions:

1. The WMP provides all of the information set forth in section 5-

5.04(A)(1)(b); and

2. The WMP indicates that at least sixty-five (65) percent of C&D debris generated by the project will be diverted;
(2) Denial. If the WMP compliance official determines that the WMP does not meet the criteria established in section 5-5.04(A), he or she shall return the WMP to the applicant marked "denied," including a statement of reason for the denial and provide notification to the building and safety department, which shall then immediately stop processing the building or demolition permit application until a revised WMP has been submitted by the applicant and approved by the WMP compliance official.

Tuesday, October 20, 2026 Reg CC MTG, Page *50

Page 6 of 10 ends

Sec. 5-5.05. - Construction/demolition hauling permit.

A construction/demolition hauling permit may be issued pursuant to this section to construction/demolition haulers under contract with a property owner in the City and who does not contract with the city-franchised waste hauler for these services. (A) Permit required. No person or solid waste enterprise shall remove construction and demolition waste from a covered project within the City without first obtaining a construction/demolition hauling permit or a franchise under Section 5-5.4 and a City business license. Residents shall only use a permitted construction/demolition hauler or a city-franchised waste hauler, for removal of construction/demolition waste from any covered project within the City. (B) Application for construction/demolition hauling permit. An application for a permit shall be filed with the City and be accompanied by a nonrefundable application fee in an amount set by City Council resolution to reimburse the City for all expenses incurred by it in connection with granting the permit. Before issuance of the permit, the applicant shall deposit a refundable deposit fee in an amount set by City Council resolution to be refunded individual or entity who paid the original amount upon verification by the official, of compliance with the requirements of Section 5-5.05(F). The City shall record the name and address of the person or entity that paid the deposit fee. Any refund of the deposit fee shall be issued to that person or entity unless the City receives written authorization directing payment to another person or entity. The deposit fee shall not constitute payment of the application fee and may be withheld as provided in this section.

The application shall include, at a minimum, the following information:
(1) Name, address, and telephone number of the applicant and any other principals in the hauler's business.
(2) Name, address, and contact telephone number of the subject construction/demolition project, and a copy of the service agreement for collection services at the site.
(3) The type and amount of materials and waste material that the hauler is capable of transporting.
(4) The number of vehicles that the hauler utilizes.
(5) The name, address, and contact information for the waste disposal facilities where the hauler will take diverted material and where the hauler will take waste.
(6) Such other pertinent facts or information as the official may require, including but not limited to evidence of previous experience, and demonstration of reliable and safe equipment.
(C)In order to be legally qualified to obtain a construction/demolition hauler permit:

Tuesday, October 20, 2026 Reg CC MTG, Page *51

Page 7 of 10 ends

(1) The applicant shall be willing and able to comply with the provisions of this code, applicable law, and all requirements of the permit. (2) The applicant shall have demonstrated ability to remove and transport the required construction/demolition waste to the appropriate waste disposal facilities.
(3) The applicant shall not have filed materially misleading information in its application or intentionally withheld information that the applicant lawfully is required to provide.
(4) The applicant shall not have violated the terms of this section or a probation order issued by the official, or had a construction/demolition hauling permit revoked, on another construction or demolition project in the City for a three (3)-year period preceding the date of application, as provided in subsection (G)(3) below.
(D)Issuance of permits. The official may issue a limited construction/demolition hauler permit to collect and divert construction/demolition waste from a specific project site in the City, subject to such conditions as are necessary to protect the public health, safety and welfare and to assure that the permit is exercised for its circumscribed purposes. A permit shall not be transferred to another person or solid waste enterprise. Permits shall remain in effect for the amount of time specified on the permit, unless an extension is granted in writing by the official for the purpose of completing work on the specified project. An extension request shall be submitted in writing, no less than thirty days before expiration of the permit. The official may grant an extension subject to the application requirements set forth in Section 5-5.05(B). (E) Records. During the term of any covered project, the permitted hauler shall keep records of the amount of waste disposed and diverted in tonnage or in other measurements approved by the official that can be converted to tonnage. (F) Reporting.
(1) Every three (3) months from the date the permit is issued, the hauler shall submit, under penalty of perjury, documentation establishing compliance with the requirements of this section. The documentation shall consist of a completed quarterly “WMP compliance report," showing the weight of materials disposed and diverted, supported by evidence, which may include originals or photocopies of receipts and weight tickets/invoices or other records of measurement from recycling and/or landfill disposal companies.

Receipts and weight tickets may be required by the official to verify the amount of construction or demolition waste generated from the site that has been diverted. After reviewing a quarterly WMP compliance report, the official shall issue a written determination of compliance or noncompliance, stating whether the requirements have been satisfied and identifying any deficiencies.

Tuesday, October 20, 2026 Reg CC MTG, Page *52

Page 8 of 10 ends

(2) Within thirty (30) calendar days following the completion of any covered project, the hauler shall submit under penalty of perjury documentation establishing compliance with the requirements of this section. The documentation shall consist of a completed "Recycling and Waste Reduction Final Compliance Report" showing the weight of materials disposed and diverted, supported by evidence, which may include originals or photocopies of receipts and weight tickets/invoices or other records of measurement from recycling companies and/or landfill and disposal companies. Receipts and weight tickets may be required by the official to verify the amount of construction or demolition waste generated from the site that has been diverted. After reviewing a Recycling and Waste Reduction Final Compliance Report, the official shall issue a written determination of compliance or noncompliance, stating whether the requirements have been satisfied, identifying any deficiencies, providing notice of the right to appeal, and the amount of the deposit fee to be refunded.
(G)Probation and revocation.
(1) Failure by a permitted hauler to comply with the diversion and/or reporting requirements of this section will result in the forfeiture of the deposit fee, and revocation of the construction/demolition hauler permit at the discretion of the official.
(2) The official is authorized to put a hauler on probation when the hauler fails to submit quarterly reports, or fails to demonstrate compliance with the diversion requirements in the quarterly reports, or final compliance report. A probation order shall be in writing and provide the hauler an opportunity to demonstrate compliance with the reporting and diversion requirements in future quarterly “WMP compliance reports" and/or the "Recycling and Waste Reduction Final Compliance Report." The probation order may impose reasonable conditions on the hauler aimed at achieving compliance with such requirements. The written notice of the probation order shall:
(a) Identify each alleged violation and facts supporting the determination; (b) Identify any missing documentation or corrective action necessary to cure the alleged violation;
(c) Provide a deadline of at least thirty (30) calendar days to correct any curable violation or submit a written response and supporting evidence; (d) State the amount of the deposit fee that will be withheld in the event the permitted hauler fails to cure the violation; and
(e) Identify any proposed administrative penalty or permit revocation. (3) After expiration of the time stated in the written notice of the probation order, the official shall consider all timely submitted information and any subsequent quarterly “WMP compliance reports" and/or "Recycling and Waste Reduction Final Compliance Report" and issue a written final Tuesday, October 20, 2026 Reg CC MTG, Page *53

Page 9 of 10 ends

determination on the probation order or extend the deadline to correct any curable violation and submit written responses. The final determination shall:
(a) State whether a violation has been determined to occur and include the evidence supporting the determination;
(b) State whether the violation was corrected;
(c) Identify any administrative penalty, the amount of the deposit fee to be refunded or withheld, and any permit revocation to be imposed; and (d) Provide notice of the right to appeal pursuant to Section 5-5.06. (4) A hauler whose permit has been revoked, or who has failed to comply under a probation order, shall be notified in writing and shall not be eligible for a new permit for a period of three years from the date of the final written decision.
(5) The official's decision to issue a probation order or to revoke a permit may be appealed to the City Manager in the same manner as decisions are appealed under Section 5-5.06.
(H)Monitoring responsibility of official. The official shall monitor each covered project for compliance with this section.

Sec. 5-5.06. - Appeal.
(A) Any determination of the WMP compliance official may be appealed to the City Manager upon written request of any applicant. An applicant must file the appeal within fifteen (15) days after the date the original decision was sent to the applicant. The appeal fee shall be paid at the time of filing. The amount of the appeal fee shall be set by City Council resolution. An appeal is not considered filed until the fee has been paid. The decision of the City Manager will be final. (B) The notice of appeal of the decision of the official must contain the following information in addition to the information given by the applicant thereon or reasonably required by the city clerk therefor:
(1) The name, address, and telephone number of the applicant; and (2) The type of action requested; and
(3) The date on which said decision was made and the name of the official taking such action; and
(4) The grounds on which the appeal is taken.
(C)The fee for filing an appeal will be charged as provided by resolution of City Council.

Tuesday, October 20, 2026 Reg CC MTG, Page *54

Page 10 of 10 ends

Sec. 5-5.07. - Implementing regulations.

The City Manager shall have the authority to establish regulations for the implementation of this chapter, and when duly established, such regulations shall be in full force and effect.

Tuesday, October 20, 2026 Reg CC MTG, Page *55
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Susan Kamada, Deputy City Manager/Administrative Services Director
MEETING DATE: October 20, 2026
SUBJECT: Fiscal Year 2025/2026 Year-End Budget Amendments

RECOMMENDATION
Approve the FY 25-26 Year-End Budget Amendments as proposed and direct staff to make necessary expenditure and revenue budget amendments to implement the recommendations.

BACKGROUND
The City is required to maintain a balanced annual budget and ensure its expenditures do not exceed revenues. Given the complexity of the municipal budget, which represented $34 million all-funds in FY 25-26, the City’s full financial picture comes into focus after all expenses and revenues are remitted in the months following the close of the Fiscal Year on June 30 of each year.

The Year-End Budget Closeout process involves a comprehensive review of City’s financial position by each of the City’s various funds, resulting in recommendations of necessary adjustments (transfers) based on actual revenues and expenditures throughout the fiscal year.

DISCUSSION
Staff completed the FY 25-26 Year-End review on October 8, 2026. After the recommended necessary transfers and adjustments, the General Fund is estimated to end the fiscal year with $17,123,904 in revenues and $16,946,357 in expenditures, representing a $177,547 surplus.

Item No. 7f
Tuesday, October 20, 2026 Reg CC MTG, Page *56
2 Fiscal Year 2025/2026 Adopted Budget
In June 2024 the City Council adopted the FY 24-26 biennial (two-year) operating and capital improvement budgets. The City Council subsequently adopted Mid-Cycle adjustments in June 2025, with General Fund expenditures of $17,260,186 and revenues of $17,260,186, reflecting a balanced budget.

Attachment 1 is a summary of all-funds’ expenditures and revenues year-end amendments, which are described in more detail below.

Detailed Revenue Amendments
The City’s primary revenue sources include property, sales, and motor vehicle in lieu taxes. The other major revenue sources are development related revenues. Each of these sources has seen better than expected revenues over the fiscal year, and as a result staff amendments are necessary to reflect those revenues. Other special revenue funds have also seen better than anticipated revenues during the fiscal year that require an amendment.

Staff reviewed the status of the City’s major revenue sources to identify variances between budgeted and actual revenues. The resulting differences drive the recommendations for revenue budget amendments as proposed below:

Other Funds:

Fund 310 Capital Improvement $ 500,000
Fund 311 Street Improvement 841,985
Fund 312 Facilities Improvement (95,368)
Fund 610 Equipment Replacement 200,000
Fund 612 Sewer Replacement 150,000
Total Budget Amendments $ 1,596,617
Detailed Expenditure Amendments
Similarly, staff also reviewed the status of the City’s expenditures to identify potential variances between budgeted and actual expenditures. A review of the General Fund expenditures found several areas where actual year-end expenditures were less than anticipated in the adopted budget. Some special revenues funds have seen an increase in costs during the fiscal year that also require amendment. The resulting differences drive the recommendations for revenue budget amendments as proposed below:

Tuesday, October 20, 2026 Reg CC MTG, Page *57
3 FISCAL IMPACT
The adjustments identified will increase revenues by $1,096,617 and increase expenditures by $283,183. The amendments will result in a $177,547 surplus for FY 25-

26. VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 6: High Performing Organization – Strengthening City services through innovation and excellence.

OPTIONS

1. Approve staff’s recommendations.

2. Amend staff’s recommendations.

General Fund:

City Council $ 700
City Attorney 11,000
Administrative Services 1,550
Emergency Operations 5,000
Animal Care & Control 42,000
Planning (60,250)
Transfers to Other Funds 1,596,617
$ 1,596,617
Other Funds:

Measure R $ (550,000)
Measure M (1,000,000)
Measure W 273,697
Prop A (205,500)
Prop C (30,000)
Landscape Maint District #1 5,000
Lomita Manor 96,869
Capital Improvement 80,000
Railroad Museum Foundation 16,500
Tuesday, October 20, 2026 Reg CC MTG, Page *58
4 ATTACHMENTS

1. Fiscal Year 2024/2025 Budget Amendments
Approved by:
________
Andrew Vialpando
City Manager
Prepared by:
________
Susan Kamada
Administrative Services Director
Tuesday, October 20, 2026 Reg CC MTG, Page *59
Fiscal Year 2025-2026 Year-End Budget Amendments
City of Lomita
Revenues Budget Year to Date
Budget
Balance
Percent
Remaining
Budget
Adjustment Revised Budget
Fund: 310 - Capital Improvement
310-000-4951.000 Transfer from General Fund 0 21,033 (21,033) 0% 500,000 500,000 Capital Improvement Fund Revenue Total: 1,500 37,731 (36,231) -2415% 500,000 501,500 Fund: 311 - Street Improvement
311-000-4951.000 Transfer from General Fund 158,015 0 158,015 100% 841,985 1,000,000 Street Improvement Fund Revenue Total: 163,015 88,544 74,471 46% 841,985 1,005,000 Fund: 312 - Facilities Improvement
312-000-4951.000 Transfer from General Fund 395,368 0 395,368 100% (95,368) 300,000 Facilities Improvement Fund Revenue Total: 395,368 0 395,368 100% (95,368) 300,000 Fund: 610 - Equipment Replacement
610-000-4951.000 Transfer from General Fund 0 0 0 0% 200,000 200,000 Equipment Replacement Fund Revenue Total: 500 57,186 (56,686) -11337% 200,000 200,500 Fund: 612 - Sewer Replacement
612-000-4951.000 Transfer from General Fund 0 0 0 0% 150,000 150,000 Sewer Replacement Fund Revenue Total: 0 0 0 0% 150,000 150,000 Total Fiscal Year 2024-2025 Year-End Budget Amendments 1,596,617 Tuesday, October 20, 2026 Reg CC MTG, Page *60
Fiscal Year 2025-2026 Year-End Budget Amendments
City of Lomita
Expenditures Budget Year to Date
Budget
Balance
Percent
Remaining
Budget
Amendments Revised Budget
Fund: 100 - General Fund
100-110-5430.000 Conferences and Meetings 53,000 55,613 (2,613) -5% 700 53,700 100-120-5305.000 Legal Services 250,000 260,509 (10,509) -4% 11,000 261,000 100-210-5219.000 Technology Allowance 0 1,859 (1,859) 0% 1,550 1,550 100-333-5340.000 Professional Services 16,000 21,111 (5,111) -32% 5,000 21,000 100-336-5325.000 Animal Care and Control 110,000 151,255 (41,255) -38% 42,000 152,000 100-410-5345.000 Contractual Services 829,200 738,031 91,169 11% (60,250) 768,950 100-990-5992.000 Transfer to Improvement Funds 353,383 0 353,383 100% 1,596,617 1,950,000 General Fund Expense Total: 17,364,429 15,349,740 2,014,689 12% 1,596,617 18,961,046 Fund: 207 - Measure R Local Return
Department: 610 - Street Maintenance
207-610-5705.000 General Maintenance 10,000 0 10,000 100% (10,000) 0 207-610-5706.000 Street Repairs 40,000 0 40,000 100% (40,000) 0 207-810-5806.368 Street Reconstruction Zone G 500,000 0 500,000 100% (500,000) 0 Measure R Local Return Fund Expense Total: 555,680 5,680 550,000 99% (550,000) 5,680 Fund: 209 - Measure M
209-810-5806.368 Street Reconstruction Zone G 1,000,000 82,570 917,430 92% (900,000) 100,000 209-810-5806.374 Narbonne South Street Reconstuction 1,300,000 379,529 920,471 71% (1,000,000) 300,000 Measure M Fund Expense Total: 2,985,858 719,635 2,266,223 76% (1,000,000) 1,985,858 Fund: 211 - Measure W
211-347-5773.000 EWMP/CIMP Implementation - SBCCO 90,000 114,141 (24,141) -27% 25,000 115,000 211-810-5806.359 Downtown Lomita Stormwater 174,000 422,697 (248,697) -143% 248,697 422,697 Measure W Fund Expense Total: 273,500 547,046 (273,546) -100% 273,697 547,197 Fund: 220 - Proposition A Local Return
220-340-5345.000 Contractual Services 330,000 122,610 207,390 63% (205,000) 125,000 220-340-5345.339 Teen Program - Bus 3,000 0 3,000 100% (500) 2,500 Proposition A Local Return Fund Expense Total: 1,570,643 1,358,439 212,204 14% (205,500) 1,365,143 Tuesday, October 20, 2026 Reg CC MTG, Page *61
Fiscal Year 2025-2026 Year-End Budget Amendments
City of Lomita
Expenditures Budget Year to Date
Budget
Balance
Percent
Remaining
Budget
Amendments Revised Budget
Fund: 225 - Proposition C Local Return
225-810-5806.370 CIP Master Plan 30,000 0 30,000 0% (30,000) 0 Proposition C Local Return Fund Expense Total: 50,000 16,077 33,923 0% (30,000) 20,000 Fund: 245 - Landscape Maintenance District #1
245-720-5755.000 Special Department Supplies & Expens 1,000 13,645 (12,645) -1264% 5,000 6,000 Landscape Maintenance District #1 Fund Expense Total: 16,500 20,955 (4,455) -27% 5,000 21,500 Fund: 260 - Lomita Manor Development
260-518-5750.000 Contributions to Agencies 536,927 633,796 (96,869) -18% 96,869 633,796 Lomita Manor Development Fund Expense Total: 536,927 633,796 (96,869) -18% 96,869 633,796 Fund: 310 - Capital Improvement
310-820-5820.376 Railroad Museum Improvements 0 79,270 (79,270) 0% 80,000 80,000 Capital Improvement Fund Expense Total: 0 79,270 (79,270) 0% 80,000 80,000 Fund: 720 - Railroad Museum Foundation
720-990-5998.000 Transfer to Railroad Museum Foundat 15,000 30,503 (15,503) -103% 16,500 31,500 Railroad Museum Foundation Fund Expense Total: 15,000 31,302 (16,302) -109% 16,500 31,500 Total Fiscal Year 2025-2026 Year-End Budget Amendments 283,183 Tuesday, October 20, 2026 Reg CC MTG, Page *62
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Deanna Fraley, PE, Public Works Director
MEETING DATE: October 20, 2026
SUBJECT: Reaffirming Resolution No. 2026-50 Authorizing Procurement Under California Public Contract Government Code Section 22050(c)(1)

RECOMMENDED ACTION
Adopt Resolution No. 2026-52 to reaffirm the adoption of Resolution No. 2026-50 on October 6, 2026, authorizing the immediate emergency repair of the of the mixer at the Cypress Reservoir and finding an emergency exists requiring immediate action to repair; direct the City Clerk to confirm the same in the minutes of this City Council meeting, via Minute Order, reflecting this action.

BACKGROUND
The Cypress Water Treatment Plant and Reservoir are integral components of the City's water system. Water treated at the Cypress Treatment Plant is stored within the Cypress Reservoir prior to entering the City's distribution system. Proper mixing within the reservoir is important to maintain consistent water quality and disinfectant residual throughout the reservoir and distribution system.

On September 14, 2026, during routine daily water quality monitoring at the Cypress Treatment Plant, it was discovered that the in-tank mixer was no longer operating. The equipment has experienced deterioration from rust and corrosion over time and is no longer providing the circulation necessary for normal reservoir operations.

On October 6, 2026, the City Council adopted Resolution No. 2026-50 and authorized the emergency repair of the mixer at the Cypress Reservoir without competitive solicitation of bids, finding that emergency conditions exist (Attachment 1). When procuring equipment under emergency conditions, California Public Contract Government Code Section 22050(c)(1) requires that the City Council reaffirm the

CITY OF LOMITA

CITY COUNCIL REPORT
Item No. 7g
Tuesday, October 20, 2026 Reg CC MTG, Page *63
2 Resolution at each subsequent regular meeting to demonstrate that the emergency conditions continue to exist until the project is complete.

DISCUSSION
The City Manager executed a contract with Doane and Hartwig Water Systems, Inc. in the amount of $199,101.25 plus a 20% contingency amount of $39,820.25 for unexpected costs, for a total not to exceed amount of $238,921.50 to repair the mixer. The work is anticipated to be completed in the next several weeks.

FISCAL IMPACT
There are no financial implications resulting from this recommendation.

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS
Approve recommended action.

ATTACHMENTS

1. Resolution 2026-52

2. Resolution 2026-50
Reviewed by: Approved by:
_______________________ ______________________
Deanna Fraley, PE Andrew Vialpando
Public Works Director City Manager
Tuesday, October 20, 2026 Reg CC MTG, Page *64

Page 1 of 3 ends

RESOLUTION NO. 2026-52

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LOMITA,

CALIFORNIA, DETERMINING A NEED TO CONTINUE ACTION
PURSUANT TO PUBLIC CONTRACT CODE SECTION 22050 FOR

REPAIR OF THE MIXER AT THE CYPRESS RESERVOIR

THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, DOES HEREBY FIND, ORDER AND RESOLVE AS FOLLOWS:

SECTION 1. Recitals.

A. On September 14, 2026, Lomita Treatment Plant Operators discovered that the in-tank reservoir mixer at the Cypress Treatment Plant was not churning the water due to deterioration and is no longer providing the circulation necessary for normal reservoir operations. The mixer distributes treatment chemicals, maintains consistent disinfectant residuals, reduces water stratification, and provides consistent water quality before water enters the distribution system.

B. Currently, water stored in the Cypress Reservoir is used for fire flow and requires daily disinfectant residual testing to ensure the water remains safe for distribution. Proper operation of the mixer is therefore a crucial component of the City’s water treatment process.

C. On October 6, 2026, the City Council adopted Resolution No. 2026-50, pursuant to California Public Contract Code Section 22050, by a four-fifths vote, that the immediate repair of the mixer at the Cypress Reservoir was necessary in order to protect the public health, safety, and welfare, that the emergency would not permit a delay resulting from a competitive solicitation for bids, and that the authorized action was necessary to respond to the emergency. Resolution No. 2026-50 authorized emergency repairs and associated work without competitive bidding and provided funding in the amount of $238,921.50.

D. Following adoption of Resolution No. 2026-50 on October 6, 2026, the City Manager executed a contract with Doane and Hartwig Water Systems, Inc. for the emergency repair of the Cypress Reservoir mixer; City staff has met with the contractor; and the work necessary to restore adequate reservoir mixing remains incomplete, requiring continuation of the action.

E. Section 22050 of the California Public Contract Code requires that after proceeding with an emergency project, the City Council shall review the emergency action at its next regularly scheduled meeting and at every regularly scheduled meeting thereafter until the emergency action is terminated, and determine by a four-fifths vote whether there is a need to continue the action.

Tuesday, October 20, 2026 Reg CC MTG, Page *65
Resolution No. 2026-52

Page 2 of 3 ends

Section 2. Findings. After considering the record, including the foregoing recitals, reports, information and recommendations from Staff, the City Council finds as follows:
a. The work necessary to remedy the emergency identified in Resolution No. 2026-50 remains incomplete. Until the necessary mixing function is restored, the conditions impairing reservoir operations described above continue to require immediate action to protect health, property, and essential public water service.
b. The City Council has considered whether the emergency action may be terminated as required by Public Contracts Code section 22050, and whether there remains a need to continue the emergency action at this time. c. The City Council finds that the emergency will not permit a delay resulting from a competitive solicitation for bids, and that continuing this action is necessary to respond to the emergency.

Section 3. Based on the foregoing findings, the City Council determines that the emergency action authorized by the City Council on October 6, 2026, by Resolution No. 2026-50 regarding the repair of the Cypress Reservoir Water Mixer shall be deemed to continue, that the action is necessary to respond to the emergency, and there is substantial evidence in the records that the continued emergency will not permit a delay resulting from a competitive solicitation of bids.

Section 4. Pursuant to Public Contract Code section 22050, the City Manager and Director of Public Works shall report to the City Council, at the next regular meeting of the City Council and at every meeting thereafter until the action is terminated, information necessary to determine if there is a need to continue the action.

Section 5. Pursuant to Public Contract Code section 22050, the City Council shall, at the next regular meeting of the City Council and at every regularly scheduled meeting thereafter, consider and reaffirm by a four-fifths vote that there is a need to continue the action.

Section 6. This Resolution will become effective immediately upon adoption.

Section 7. The City Clerk shall certify the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED, APPROVED AND ADOPTED, this 20th day of October 2026. [Signatures on the following page]
Tuesday, October 20, 2026 Reg CC MTG, Page *66
Resolution No. 2026-52

Page 3 of 3 ends

________________________________
Cindy Segawa, Mayor
ATTEST:
_____________________
Kathleen Horn Gregory, MMC, City Clerk
APPROVED AS TO FORM:
________________________
Trevor Rusin, City Attorney
Tuesday, October 20, 2026 Reg CC MTG, Page *67
Tuesday, October 20, 2026 Reg CC MTG, Page *68
Tuesday, October 20, 2026 Reg CC MTG, Page *69
Tuesday, October 20, 2026 Reg CC MTG, Page *70
Tuesday, October 20, 2026 Reg CC MTG, Page *71
Tuesday, October 20, 2026 Reg CC MTG, Page *72
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Emma Kelley, Parks and Recreation Director Juan Ibarra, Senior Management Analyst
MEETING DATE: October 20, 2026
SUBJECT: Agreement with Kimley Horn and Associates for Community Outreach and Grant Services for the Lomita Sports and Community Center Project

RECOMMENDED ACTION
Approve a Professional Services Agreement with Kimley Horn and Associates for Outreach and Grant Services for the Lomita Sports and Community Center Project (formerly “Navy Fields”) for $199,938, plus a contingency amount of $20,000 for unexpected costs, for a total not to exceed $219,938; and authorize the City Manager to execute the agreement.

BACKGROUND
The City of Lomita is pursuing acquisition of approximately six acres of U.S. Navy property at 26800 South Western Avenue, commonly known as the “Navy Ballfields”. The property has served as a youth baseball facility for more than 50 years, with Lomita Little League operating under a license agreement with the Navy. Acquisition would provide an opportunity to preserve recreational use and expand amenities for the community.

Following enactment of the National Defense Authorization Act in December 2024, the City began meeting with the Navy in February 2025 regarding a potential lease transfer.

A land survey followed in April 2025, and environmental studies began in August 2025.

In November 2025, discussions shifted from a lease transfer to conveyance of the property to the City. Subsequent efforts included a meeting with Navy representatives in Washington, D.C., in March 2026 and appraisal and acquisition negotiations in August 2026.

In April 2026, the City was awarded a $500,000 grant from the Los Angeles County Regional Park and Open Space District to support planning and design for the future

CITY OF LOMITA

CITY COUNCIL REPORT
Item No. 8a
Tuesday, October 20, 2026 Reg CC MTG, Page *73
2 Lomita Sports and Community Center. Community input will guide the identification of recreational needs and development of concepts for the site, and will help identify community priorities, evaluate potential recreational uses, and establish a foundation for future project development and funding.

DISCUSSION
On July 21, 2026, the City published a Request for Proposals (RFP) or professional design services, including public outreach and conceptual design for the Lomita Sports and Community Center. The City received 10 proposals, and staff interviewed the highest ranked firms.

RFP Scope of Work
The RFP sought a highly qualified and experienced consultant to lead a comprehensive community outreach and input process for the Lomita Sports and Community Center.

Several requirements were highlighted in the RFP Scope of Work. Community outreach and engagement will include a minimum of three in-person bilingual community workshops, at least two pop-up outreach events, and a bilingual and online survey. The development of a conceptual design includes alternatives that reflect community priorities and City goals from which the City Council may consider. All these tasks are required to be completed within a 6-month timeline.

All City Commissions and the City Council will have opportunities to review and provide input throughout the process.

Evaluation and Selection Process
Staff presented the three highest ranked firms to the Parks and Recreation Commission at its meeting on September 22, 2026. During discussion of qualifications and best fit, the Commission emphasized the importance of community outreach and identified KimleyHorn and Associates as its preferred consultant. The Navy Fields Ad Hoc Committee, consisting of Mayor Segawa and Councilmember Waronek, subsequently reviewed the proposals on September 30, 2026. The Ad Hoc agreed with the recommendations by staff and the Commission that of Kimley-Horn was the most qualified and best fit.

Kimley-Horn and Associates
Staff recommends that the City Council authorize an Agreement with Kimley-Horn for community outreach and design input services based on their demonstrated approach to community engagement, relevant parks and recreation experience, and integrated project team. Their proposal combines traditional outreach with interactive digital tools, stakeholder partnerships, and opportunities for continued feedback during concept development. Planners, engineers, and landscape architects would participate directly in outreach alongside the community engagement team, helping translate public input into feasible conceptual alternatives. Kimley-Horn has also worked with the City on its Traffic Tuesday, October 20, 2026 Reg CC MTG, Page *74
3 Calming Toolkit and conducted a peer review of the design of the Local Travel Network design.

The proposed engagement and conceptual design process is anticipated to take approximately six months. Public input will identify recreational needs and priorities and inform proposed site uses, amenities and conceptual alternatives.

Addendum for Grant Application Services
During the evaluation and selection process, staff was made aware of park development grant funds made available through State Proposition 4 (Prop 4). On September 29, staff met with representatives from the California Department of Parks and Recreation to discuss the Statewide Park Development and Community Revitalization Program (SPP) program. The SPP is a competitive grant program that supports new parks and recreational opportunities in underserved communities throughout California. The current funding cycle provides approximately $188.5 million statewide, with grant requests ranging from $200,000 to $8.5 million. Eligible projects include the development of new parks and the expansion or renovation of existing parks. Applications are due December 17, 2026.

During that meeting, staff reviewed program requirements, eligibility criteria, available funding, application timelines, and the necessary steps to submit a competitive application. Staff was advised that the applications are due on December 17, 2026 and that no future grant cycle has been announced. Given the uncertainty of future funding, it is in the City’s interest to pursue this opportunity expeditiously.

To meet the application deadline of December 17, 2026 and maximize the City’s competitiveness, the City must complete an accelerated community engagement and project development process. To earn full points under the grant’s meeting criteria, this process should include at least five community engagement meetings, including at least two held in the evening or on weekends, to identify local park and recreation needs and priorities.

Staff requested an expanded proposal from Kimley Horn, attached to this staff report, to include grant application preparation and submission, development of project concept, and community outreach, including five community engagement meetings before the grant deadline to maximize competitiveness under the grant’s meeting criteria. Additional outreach activities would continue into 2027 to further inform the projects conceptual design.

Awarding the agreement would advance the community engagement and concept development components of Phase II. The resulting concepts will guide subsequent detailed planning and design and help the City identify future funding needs.

Tuesday, October 20, 2026 Reg CC MTG, Page *75
4 FISCAL IMPACT
The agreement with Kimley-Horn is for an amount not to exceed $219,938, which includes $20,000 in contingency funds for unexpected costs. Virtually all costs associated with this phase are funded through the Los Angeles County Regional Park and Open Space District (RPOSD) grant. The additional grant application services added will cost $19,929 and is not eligible for reimbursement through the RPOSD grant, which will be appropriated from the General Fund Available Balance.

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 4: Quality of Life & Livability – Creating vibrant spaces and services for all ages and Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS

1. Approve recommended action.

2. Provide staff with further direction.

ATTACHMENTS

1. Professional Services Agreement with Kimley-Horn & Associates, including the proposal as Exhibit A.

Approved by:
.
_______________________
Andrew Vialpando
City Manager
Tuesday, October 20, 2026 Reg CC MTG, Page *76

CONTRACT FOR PROFESSIONAL SERVICES

BETWEEN

THE CITY OF LOMITA AND KIMLEY-HORN

Page 1 of 11 ends

This AGREEMENT to provide Professional Design Services, Community Outreach and Grant Services for the Lomita Sports and Community Center Project is entered into this 20th day of October 2026, by and between the CITY OF LOMITA, a general law city and municipal corporation (“CITY”) and KIMLEY-HORN AND ASSOCIATES, INC., a North Carolina corporation (“CONSULTANT”).

R E C I T A L S
A. CITY does not have the personnel able and/or available to perform the services required under this agreement.

B. Therefore, CITY desires to contract out for professional services for Professional Design Services, Community Outreach and Grant Services for the Lomita Sports and Community Center.

C. CONSULTANT warrants to CITY that it has the qualifications, experience and facilities to perform properly and timely the services under this Agreement.

D. CITY desires to contract with CONSULTANT to perform the services as described in Exhibit A of this Agreement.

NOW, THEREFORE, based on the foregoing recitals, CITY and CONSULTANT agree as follows:

1. CONSIDERATION AND COMPENSATION.

A. As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, attached as Exhibit A;
B. As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONSULTANT for its services satisfactory and reasonably rendered in an amount not to exceed $219,938 for CONSULTANT’s services, unless otherwise specified by written amendment to this Agreement.

D. No additional compensation shall be paid for any other expenses incurred, unless Tuesday, October 20, 2026 Reg CC MTG, Page *77

Page 2 of 11 ends

first approved by the City Manager or his designee.

E. CONSULTANT shall submit to CITY, by not later than the 10th day of each month, its bill for services itemizing the fees and costs incurred during the previous month. CITY shall pay CONSULTANT all uncontested amounts set forth in the CONSULTANT'S bill within 30 days after it is received.

2. SCOPE OF SERVICES.

A. CONSULTANT will perform the services and activities set forth in the SCOPE OF SERVICES attached hereto as Exhibit A and incorporated herein by this reference.

If any part of Exhibit A is inconsistent with the terms of this Agreement, the terms of this Agreement shall control.

B. Except as herein otherwise expressly specified to be furnished by CITY, CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement.

3. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period.

4. TIME OF PERFORMANCE. The services of CONSULTANT are to commence upon receipt of a notice to proceed from CITY and shall continue until all authorized work is completed to CITY’s reasonable satisfaction, in accordance with the schedule incorporated in “Exhibit A,” unless extended in writing by CITY.

5. FAMILIARITY WITH WORK. By executing this Agreement, CONSULTANT represents that CONSULTANT has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.

6. KEY PERSONNEL. CONSULTANT’s key person assigned to perform work under this Agreement is Laura Forinash. CONSULTANT shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of CITY.

7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire on October 19, 2027, unless earlier termination occurs under Section 12 of this Agreement, or extended in writing in advance by both parties.

Tuesday, October 20, 2026 Reg CC MTG, Page *78

Page 3 of 11 ends

2. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.

3. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number.

4. PERMITS AND LICENSES. CONSULTANT will obtain and maintain during the term of this Agreement all permits, licenses, and certificates that may be required by local, state and federal laws in connection with the performance of services under this Agreement, including a business license as specified in Title VI, Chapter 2 of the Lomita Municipal Code.

5. LAWS AND REGULATIONS; EMPLOYEE/LABOR CERTIFICATION.

CONSULTANT shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. CONSULTANT shall be liable for all violations of such laws and regulations in connection with the Services and this Agreement. All violations of such laws and regulations shall be grounds for CITY to terminate the Agreement for cause.

6. TERMINATION.

A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.

B. CONSULTANT may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.

C. In the event of such termination, CONSULTANT shall cease services as of the date of termination, all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONSULTANT shall, at CITY’s option, become CITY’s property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.

D. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.

7. INDEMNIFICATION.

A. CONSULTANT shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature to the extent arising out of or in connection with Tuesday, October 20, 2026 Reg CC MTG, Page *79

Page 4 of 11 ends

CONSULTANT's negligence. recklessness, or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY’S passive negligence, but excepting such loss or damage which is caused by the sole or active negligence or willful misconduct of CITY. CONSULTANT shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

B. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 18, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.

14. ASSIGNABILITY. This Agreement is for CONSULTANT’s professional services.

CONSULTANT’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.

15. INDEPENDENT CONSULTANT. CITY and CONSULTANT agree that CONSULTANT will act as an independent CONSULTANT and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only.

16. AUDIT OF RECORDS.

A. CONSULTANT agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement.

CONSULTANT agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement.

CONSULTANT further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.

B. CONSULTANT will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Tuesday, October 20, 2026 Reg CC MTG, Page *80

Page 5 of 11 ends

Agreement.

8. CORRECTIVE MEASURES. CONSULTANT will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONSULTANT will be given a reasonable amount of time as determined by CITY to implement said corrective measures. Failure of CONSULTANT to implement required corrective measures shall result in immediate termination of this Agreement.

9. INSURANCE REQUIREMENTS.

A. CONSULTANT, at CONSULTANT’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies:

1. Workers Compensation Insurance as required by law. CONSULTANT shall require all subconsultants similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers’ Compensation policies must be received by CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against CITY, its officers, agents, employees, and volunteers for losses arising from work performed by CONSULTANT for CITY.

2. General Liability Coverage. CONSULTANT shall maintain commercial general liability insurance in an amount of not less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.

3. Automobile Liability Coverage. CONSULTANT shall maintain automobile liability insurance covering bodily injury and property damage for all activities of CONSULTANT arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.

4. Professional Liability Coverage. CONSULTANT shall maintain professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors, or omissions which may arise from CONSULTANT’S operations under this Agreement, whether such operations be by CONSULTANT or by its employees, subconsultants, or subconsultants. The amount of this insurance shall not be less than two million dollars ($2,000,000) on a claims-made annual aggregate basis, or a combined single-limit-per-occurrence basis. When coverage is provided on a “claims made basis,” CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated.

Such insurance will have the same coverage and limits as the policy that Tuesday, October 20, 2026 Reg CC MTG, Page *81

Page 6 of 11 ends

was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect.

B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of California, or which is approved in writing by CITY, and shall be endorsed as follows. CONSULTANT also agrees to require all CONSULTANTs, and subconsultants to do likewise.

1. “The CITY, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the CONSULTANT, including materials, parts, or equipment furnished in connection with such work or operations.”

2. This policy shall be considered primary insurance as respects CITY, its elected or appointed officers, officials, employees, agents, and volunteers.

Any insurance maintained by CITY, including any self-insured retention CITY may have, shall be considered excess insurance only and shall not contribute with this policy.

3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.

4. The insurer waives all rights of subrogation against CITY, its elected or appointed officers, officials, employees, or agents.

5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to CITY, its elected or appointed officers, officials, employees, agents, or volunteers.

6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days’ written notice has been received by CITY.

C. CONSULTANT agrees to provide immediate notice to CITY of any claim or loss against CONSULTANT arising out of the work performed under this agreement.

CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.

D. Any deductibles or self-insured retentions must be declared to and approved by CITY. At CITY’s option, CONSULTANT shall demonstrate financial capability for payment of such deductibles or self-insured retentions.

Tuesday, October 20, 2026 Reg CC MTG, Page *82

Page 7 of 11 ends

E. CONSULTANT shall provide certificates of insurance with original endorsements to CITY as evidence of the insurance coverage required herein.

Certificates of such insurance shall be filed with CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with CITY at all times during the term of this Agreement.

F. Failure on the part of CONSULTANT to procure or maintain required insurance shall constitute a material breach of contract under which CITY may terminate this Agreement pursuant to Section 12 above.

G. The commercial general and automobile liability policies required by this Agreement shall allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and/or deductible of the policy in lieu of the CONSULTANT (as the named insured) should CONSULTANT fail to pay the SIR or deductible requirements. The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. CONSULTANT understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONSULTANT as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONSULTANT’S behalf upon CONSULTANT’S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against CONSULTANT for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.

19. USE OF OTHER CONSULTANTS. CONSULTANT must obtain CITY’s prior written approval to use any CONSULTANTs while performing any portion of this Agreement. Such approval must include approval of the proposed CONSULTANT and the terms of compensation.

20. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONSULTANT of the final payment made under this Agreement shall operate as and be a release of CITY from all claims and liabilities for compensation to the CONSULTANT for anything done, furnished or relating to the CONSULTANT’S work or services. Acceptance of payment shall be any negotiation of CITY’S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by CITY shall not constitute, nor be deemed, a release of the responsibility and liability of CONSULTANT, its employees, sub-CONSULTANTs and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by CITY for any defect or error in the work prepared by CONSULTANT, its employees, sub-CONSULTANTs and agents.

Tuesday, October 20, 2026 Reg CC MTG, Page *83

Page 8 of 11 ends

21. CORRECTIONS. In addition to the above indemnification obligations, the CONSULTANT shall correct, at its expense, all errors in the work which may be disclosed during CITY’S review of CONSULTANT’S report or plans. Should the CONSULTANT fail to make such correction in a reasonably timely manner, such correction shall be made by CITY, and the cost thereof shall be charged to CONSULTANT. In addition to all other available remedies, CITY may deduct the cost of such correction from any retention amount held by CITY or may withhold payment otherwise owed CONSULTANT under this Agreement up to the amount of the cost of correction.

22. NON-APPROPRIATION OF FUNDS. Payments to be made to CONSULTANT by CITY for services preformed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONSULTANT’S services beyond the current fiscal year, the Agreement shall cover payment for CONSULTANT’S only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.

23. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

CITY CONSULTANT
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
ATTN: City Manager
Kimley-Horn and Associates
401 B St #600,
San Diego, CA 92101
ATTN: Michael Madsen
Senior Vice President
Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.

24. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT’s bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability.

Tuesday, October 20, 2026 Reg CC MTG, Page *84

Page 9 of 11 ends

25. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT’s or CITY’s obligations under this Agreement.

26. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.

27. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.

28. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.

29. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY’s city administrator, or designee, may execute any such amendment on behalf of CITY.

30. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

31. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.

32. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.

33. ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.

Tuesday, October 20, 2026 Reg CC MTG, Page *85

Page 10 of 11 ends

10. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY.

CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private CONSULTANTs, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.

11. DISCLOSURE REQUIRED. (CITY and CONSULTANT initials required at one of the following paragraphs)
By their respective initials next to this paragraph, CITY and CONSULTANT hereby acknowledge that CONSULTANT is a “CONSULTANT” for the purposes of the California Political Reform Act because CONSULTANT’S duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a)(2) or otherwise serves in a staff capacity for which disclosure would otherwise be required were CONSULTANT employed by CITY. CONSULTANT hereby acknowledges his or her assumingoffice, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the CITY’S Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to CONSULTANT commencing services hereunder, the City’s Manager shall prepare and deliver to CONSULTANT a memorandum detailing the extent of CONSULTANT’S disclosure obligations in accordance with the CITY’S Conflict of Interest Code.

City Initials ______
CONSULTANT Initials ______
OR
By their initials next to this paragraph, CITY and CONSULTANT hereby acknowledge that CONSULTANT is not a “CONSULTANT” for the purpose of the California Political Reform Act because CONSULTANT’S duties and responsibilities are not within the scope of the definition of CONSULTANT in Fair Political Practice Commission Regulation 18700.3(a)(2) and is otherwise not serving in staff capacity in accordance with CITY’S Conflict of Interest Code.

City Initials ______
CONSULTANT Initials ______
Tuesday, October 20, 2026 Reg CC MTG, Page *86

Page 11 of 11 ends

IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

CITY OF LOMITA KIMLEY-HORN AND ASSOCIATES,
a North Carolina corporation
Andrew Vialpando, City Manager By: Michael Madsen, Senior Vice President
ATTEST:

Kathleen Horn Gregory, City
Clerk
Taxpayer ID No.

APPROVED AS TO FORM:

Trevor Rusin, City Attorney
Tuesday, October 20, 2026 Reg CC MTG, Page *87
PREPARED FOR: PREPARED BY:

City of Lomita
Proposal for Professional Design Services for the
Lomita Sports and
Community Center
Phase 1 Image generated by AI
Image generated by AI
Tuesday, October 20, 2026 Reg CC MTG, Page *88
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
October 13, 2026
Lina Hernandez, Assistant City Manager
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
Re: Request for Proposals, Professional Design Services for the Lomita Sports and Community Center, Phase 1 Dear Ms. Hernandez and Selection Committee,
The City of Lomita (City) has a rare opportunity to transform the Navy Fields property into a recreational destination that expands access to parks, recreation, and community gathering spaces for residents while providing lasting benefits for the broader South Bay region. Success will require balancing community aspirations with site constraints, operational realities, and funding considerations while maintaining momentum toward implementation. Kimley-Horn is uniquely qualified to help the City achieve that goal.

Our team brings the specific combination of sports-facility and community center design expertise, Southern California public agency relationships, and structured bilingual outreach capability that Phase 1 requires. Three qualities in particular set our team apart:

The Right Team for Lomita. Kimley-Horn has assembled a team with the local knowledge, technical expertise, and experience leading community-driven planning efforts for public agencies needed to successfully guide this project. Laura Forinash, PE, TE, will serve as Project Manager, bringing extensive experience supporting South Bay agencies through staff augmentation and project delivery roles, along with firsthand experience working with the City of Lomita and its stakeholders. She is supported by Maya Bouchet, AICP, who will lead community outreach and stakeholder engagement efforts; Barsin Govargez, PE and Michael Ledbetter, PLA, who will deliver multi-use parks and athletic facilities expertise; and Michael Madsen , PLA, CLIA, who will provide senior-level design oversight and quality assurance throughout the project.

An Intentional, Measure A-Aligned Public Engagement Process. Our bilingual outreach strategy is intentionally designed to satisfy Measure A objectives while creating meaningful opportunities for residents, stakeholders, and regional users to shape the future of the site. Through workshops, pop-up events, stakeholder interviews, community partnerships, and the PublicCoordinate engagement platform, we will broaden participation, lower barriers to engagement, and create a transparent process that clearly demonstrates how community input influences project decisions.

A Vision Positioned for Phase 2. Phase 1 is about more than identifying community priorities. It is about developing a realistic roadmap for the future of the site. Our integrated approach brings outreach, design, parking considerations, cost estimating, and operational planning together from the outset. By continuously testing ideas against site constraints, maintenance needs, funding realities, and long-term operational considerations, we will help the City develop a preferred concept that is community-supported, finanically realistic, and positioned to maintain momentum toward Phase 2 design, environmental review, and implementation in support of the City’s grant-funded project schedule.

We appreciate the City’s investment in this project and welcome the opportunity to support Lomita in creating a facility the community will value for generations. If you have questions regarding this proposal, please contact Laura Forinash, PE, TE at 562-549-2186 or [email protected].

Sincerely,
Laura Forinash, PE, TE Michael Madsen, PLA, CLIA
180 E. Ocean Blvd. Ste. 1200
Long Beach, CA 90802
TEL 562-549-2200
A. COVER LETTER
As Senior Vice President, Michael Madsen, PLA, CLIA is authorized to represent and bind Kimley-Horn to the term of the Proposal. Michael sits in our Sandiego office, located at. 401 B St #600, San Diego, CA 92101 We have reviewed the City’s Professional Services Agreement (Attachment B) and confirm acceptance of all terms and conditions of this RFP. • Any exceptions or proposed clarifications are identified in Section F of this proposal. • This proposal is valid for 120 days from the submission deadline of August 18, 2026. KimleyHorn acknowledges receipt of all addenda issued for this solicitation as of the date of this letter. • Kimley-Horn has reviewed the sample Professional Services Agreement and requests modifications found in section F of this proposal.

CARTA INTRODUCTORIA
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
i
Tuesday, October 20, 2026 Reg CC MTG, Page *89
VS
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Project Understanding
The project site, located at 26800 S. Western Avenue, sits on approximately six acres that has historically been known as the Navy Fields property and has long served as a recreational asset for Lomita. Today, however, the property’s three existing ballfields primarily serve a single organized user group. As the City moves to acquire the site from the U.S. Navy, this project presents a transformative opportunity to establish an expanded recreational sports complex capable of serving residents of different ages, abilities, and interests.

As one of the most park-poor cities in Los Angeles County, Lomita has limited public recreational land, making this project a significant opportunity to boost the City’s roster of public recreation offerings.

B. PROJECT UNDERSTANDING AND APPROACH
LA County Comprehensive Park & Recreation Needs Assessment COMPRENSIÓN Y ENFOQUE DEL PROYECTO

A COMMUNITY IN NEED OF OPEN SPACE
Park acres per 1,000 residents - City of Lomita vs. Los Angeles County

3.3 acres of parkland per 1,000 residents
L.A. County Average

0.5 acres of parkland per 1,000 residents
City of Lomita
One of L.A. County’s
most park-poor cities
Lomita has just
1/6
of the countywide
average for parks
1 Tuesday, October 20, 2026 Reg CC MTG, Page *90
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Additionally, the existing site’s location can provide a broader regional benefit consistent with Measure A objectives for Lomita’s neighbors in nearby Torrance, Rancho Palos Verdes, Rolling Hills Estates and LA County. Future outcomes for this project include preserving successful uses, introducing new recreational uses and community amenities, all while expanding access and creating a destination sports complex for the City of Lomita! The design challenge now is how to make the most of those six acres? There is a finite amount of square footage and every decision will involve tradeoffs between community desires for more program, parking requirements, gathering spaces and amenities and the infrastructure to support it all. We must help the community understand the options, and find consensus through shared priorities. A successful process must consider all of this while keeping an eye on initial funding and long-term operational costs, giving the City clear guide posts for decision-making, now and in the future.

Kimley-Horn’s role will be to drive that successful process while bringing creativity and discipline to the day-to-day execution of the City’s vision. We will work closely with the City’s Design Team and project stakeholders to gather ideas, generate solutions, and test their feasibility against the site’s capacity, maintenance, and public priorities. The result will be a community-driven vision, brought to life by our talented designers that the City staff can confidently present to the City Council and advance into Phase 2.

Reservoir
Verdes
Palos
250t h St
W 237t h St
Pennsylvania Ave
251s t St
240t h St
241s t St
Dr
Walnut St
Cyp ress St
Oak St
246t h St
2 47t h Pl
Cyp res s St
Oak St
Narb onne Ave
Woo d ward Ave
Eshelman Ave Eshelman Ave
Walnut St
Feijoa Ave
Eb ony Ln
Luc ille Ave
260t h St
261s t St
And reo Ave
Ag ajanian Dr
Frampton Ave
C irc le Dr
Oak heat h Dr
Batey Ave
Oak h o r ne Dr
St oneb r yn Dr
East Dr
Sout h Dr
Koleet a Dr
Ashb rid ge Ln
245t h St
Wes t Dr
M cCoy Ave
Dodge Ave
Broad well Ave
Petroleum Ave
Harb orlight D
252nd St r
Cren sh aw B lvd
Palo s Verd es Dr N
Lomit a Blvd
West er n Ave
Palo s Ve rd es Dr N
Normandie Ave
Lomit a Blvd
Sep ulved a Blvd
Vermont Ave
Anaheim St
Palos Verd e s Dr N
W Anaheim St
N Gaf f ey St
West ern Ave
Harbor Park
Reservoir
Verdes
Palos
250t h St
W 237t h St
Pennsylvania Ave
251s t St
240t h St
241s t St
Dr
Walnut St
Cyp ress St
Oak St
246t h St
2 47t h Pl
Cyp res s St
Oak St
Narb onne Ave
Woo d ward Ave
Eshelman Ave Eshelman Ave
Walnut St
Feijoa Ave
Eb ony Ln
Luc ille Ave
260t h St
261s t St
And reo Ave
Ag ajanian Dr
Frampton Ave
C irc le Dr
Oak heat h Dr
Batey Ave
Oak h o r ne Dr
St oneb r yn Dr
East Dr
Sout h Dr
Koleet a Dr
Ashb rid ge Ln
245t h St
Wes t Dr
M cCoy Ave
Dodge Ave
Broad well Ave
Petroleum Ave
Harb orlight D
252nd St r
Cren sh aw B lvd
Palo s Verd es Dr N
Lomit a Blvd
West er n Ave
Palo s Ve rd es Dr N
Normandie Ave
Lomit a Blvd
Sep ulved a Blvd
Vermont Ave
Anaheim St
Palos Verd e s Dr N
W Anaheim St
N Gaf f ey St
West ern Ave
Harbor Park
City of Lomita
Harbor City

HATHAWAY
PARK
METRO
PARK

IRENE LEWIS
PARK
LOMITA
PARK
Rolling Hills
Estates
Torrance
Rancho Palos Verdes
1 213
Existing Park
Project Site
2 Tuesday, October 20, 2026 Reg CC MTG, Page *91
We envision an integrated approach that will bring community outreach, design and visualization, and cost analysis together in a continuous process. One task should not occur separately from another and each milestone informs the next stage of the process. Our design team will be a part of the community workshops to hear first-hand from the residents and
stakeholders. Design progress will keep community input top of mind, and each outreach activity will help shape the next round of design that happen afterwards. We want the City and the community to see the progression from one design iteration to the next and understand the key decisions being made that impact the different outcomes being presented.

TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
3 C
o
m
munity Outreach
Design and
Visualiz
atio
n
Cost Analysis
Project Approach
An Integrated Engagement and Design Process
Bell Gardens Public Outreach Bell Gardens Public Outreach Tuesday, October 20, 2026 Reg CC MTG, Page *92
The efforts described below are organized into four interconnected tasks that end with City Council approval at the completion of Phase 1.

Each task within this process concludes with a defined milestone, allowing the City’s Project Design Team to confirm direction before the work advances to the next task. The following pages detail the scope, approach, and key milestones for each task.

Ai Rendering TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Oct ‘26 Nov ‘26 Dec ‘26 Jan ‘27 Feb ‘27 Mar ‘27 Apr ‘27 PublicCoordinate Map & Survey Live Develop Task
0 Materials

COMMUNITY

OUTREACH &

ENGAGEMENT

MEETINGS &

DECISION
POINTS

CONCEPT
DESIGN
Workshop #2
Alternatives
Workshop #3
Concept Validation
City Council
Presentation
Pop-Up #5
December 4, 2026
Pop-Up Event #4
Tree Lighting
November 12, 2026
Pop-Up Event #3
State of the City
October 24, 2026
Pop-Up Event #1
Halloween Carnival/Parade
October 27, 2026
Pop-Up Event #2
Seniors Coffee, Crafts, & Chat
Preferred
Concept Design,
Cost Estimate
& Phasing
Update & Revise
Alternatives
Update to
Preferred
Concept Design
Final
Review
Draft Concept
Alternatives
Package + ROM
November 6, 2026
Submit Draft Alternative
and ROM to City for review
November 11, 2026
Submit Final Alternative and ROM to City for review
November 20, 2026
Submit Grant Concept and
Cost Estimate for review
October 15, 2026
Task 0 NTP
October 21, 2026
Kick-Off
Meeting
Progress Meeting
Present Preferred
Concept
Progress Meeting
Review City Council
Meeting Materials
Commission
Meeting #3
Prepare application narrative, project description,
exhibits, community engagement documentation, and
administation attachments
December 17, 2026
Grant Application Due
November 14, 2026
Workshop #1
Present Vision, Needs, and Alternative
Option B
Schedule
City Council
Passes Resolution
2 StakeholderMeetings
GRANT

APPLICATION
TASK 1
Frame the Opportunity
Build community and stakeholder awareness, advance a grant concept informed by early input and City Council direction, and define a project or phased approach aligned with the $8.5 million maximum grant request to support a competitive Statewide Park Program application.

TASK 2
Imagine the Opportunity
Review feedback on alternatives and
provide direction on a preferred concept.

TASK 3
Refining the Opportunity
Present the final recommended concept and
provide a formal recommendation to City Council.

Workshop Agency Direction and Decision Points Decision point (Commission / Council) Progress Meetings Concept Design October 21, 2026
Task 1-4 NTP
Commission
Meeting #2
Commission
Meeting #1
Progress Meeting
Review Workshop
Materials
Progress Meeting
Review Workshop
Meeting Materials
Progress Meeting
Review Commission
Meeting Materials
November 9, 2026
City Council Working
Session
November 3, 2026
Progress Meeting Review
Survey & Outreach Feedback
November 17, 2026
Progress Meeting Review
Workshop Feedback
December 2, 2026
Progress Meeting Review
Grant Concept and Cost Estimate
December 9, 2026
Progress Meeting Review
Final Grant Materials
Progress Meeting
Review Draft
Concept Alternative
Grant Application Due
Progress Meeting
Confirm Preferred
Concept
4 Tuesday, October 20, 2026 Reg CC MTG, Page *93
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
TASK 1 – Frame the Opportunity
GOAL: Establish the project’s public identity, build community awareness of the process about to take place, and develop a clear understanding of community and stakeholder priorities.

First priority is to establish the project branding and begin building the website. The project branding is critical and carries through the entire community engagement process, from the first pop-up event to the final community workshop. It is the graphic and emotional hook that will help draw people in and help establish that we’re all working towards the same goal.

That vision comes to life on the website, which serves as a central hub for all aspects of the project. The site will include general information and FAQs, an event schedule, and Kimley-Horn’s PublicCoordinate platform.

Below and on the following page, we present a series of concept graphics for the Lomita Sports and Community Center website.

CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
+Follow
Next community workshop
Saturday, February 13, 9 am-4pm
Lomita City Hall, bilingual Interpretation provided
Let’s Reimagine the Navy Fields Together
At a glance Timeline Get involved What we heard Documents Contact English Español Lomita Sports and Community Center
The City of Lomita is inviting the community to help shape the future Navy Fields Sports and Community Center.

Your feedback will help inform the concept plan and guide the design of new recreational amenities, gathering spaces, and community features.
5 Tuesday, October 20, 2026 Reg CC MTG, Page *94 TRCALONG017183.2026  At a glance Timeline Get involved What we heard Documents Contact English Español Lomita Sports and Community Center
This project is funded in part by Los Angeles County Measure A, which supports regional recreation and inclusive, community-driven park planning across the county.

Project timeline
A roughly six-month master planning process, beginning October 2026 Get Involved Online Get involved in person
Map your ideas Take the survey Post your ideas
Available anytime, in English and Spanish Bilingual Facilitators at every event.

Project at a glance
Kickoff &
Website Launch
October 2026
Survey &
Stakeholder Outreach
Oct-Nov 2026
WORKSHOP 2:

Concept Alternatives
February 2027
WORKSHOP 3:

Preferred Concept
April 2027
City Council
Approval
Spring 2027
WORKSHOP 1:

Visioning & Needs
October 2026
Pop up events
Find us at Founders Day
and other high attendance
city events
Community workshops
Three sessions with
visualization boards
open discussion.

What we heard
Get Involved
Document Library
Key themes from community feedback, updated after each engagement Flexible fields for baseball,
soccer, and multi-use league
play ranked highest.

Youth & adult sports fields
Residents want family-friendly
gathering areas, trees, and
accessible loops.

Shade, walking paths &
open space
Adequate parking and well-lit,
secure facilities were
common priorities.

Parking, safety & lighting
This section will be updated after each engagement phase, beginning with Workshop 1. A full What We Heard summary will be posted in the document library Agendas, presentation boards, reports, and environmental documents.

DOCUMENT TYPE DATE STATUS
Project Fat Sheet (Bilingual) Fact Sheet Oct 2026
Community Survey (EN / ES) Survey Oct 2026
Workshop 1 Presentation Boards Boards Nov 2026
PDF
PDF
PDF
New
New
Pending
Project area
Past meetings and survey
Community workshop 1 -Visioning & Needs
November 2026, Lomita Community Center
Can’t make it? Take a virutal tour of the materials
Bilingual online and print survey
Open October 2026 through Workshop 2
See survey results
Site map paceholder, 26800 S. Western Ave
6 Acres
Future park site
6 Months
Community
engagement process
Community Center
Flexible
gathering spaces
Athletic Fields
Multi-use
sports fields
Your Input
Concept Plan
Help shape the vision
Tuesday, October 20, 2026 Reg CC MTG, Page *95
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
PublicCoordinate uses bilingual interactive maps and surveys to collect input from residents, stakeholders, and regional users, helping the design team understand community wants and needs and get feedback in real time as new design alternatives are developed.

Public Outreach in Monterey Park
Stakeholder Outreach - We will conduct focused stakeholder outreach to supplement the broader community process. Discussions with local organizations and other community groups will provide deeper insight into the region’s recreational habits and clarify how this park can begin to solve for lacking programs and operational concerns to take advantage of the opportunities and create meaningful community engagement.

Community Outreach will be focused on lowering barriers to participation and satisfying the regional and inclusive intent of Measure A. Special attention will be given to youth, vulnerable populations, and limited-English-proficiency attendees. Kimley-Horn has assumed up to two (2) stakeholder meetings.

Kimley-Horn has assumed that the City will coordinate the event location, duration, timing, and scheduling with stakeholders.
• Lomita Little League
• Kiwanis Club
• Boys & Girls Club
• Los Angeles Unified School District
• Lomita Chamber of Commerce
• Los Angeles County Sheriff’s Department
• Cities of Torrance, Rolling Hill Estates,
and City of Rancho Palos Verdes
• Harbor Hills Community

CLICK TO EXPLORE

THE PUBLICCOORDINATE MAP
https://engage.publiccoordinate.com/en/project/lomita-little-league 7 Tuesday, October 20, 2026 Reg CC MTG, Page *96
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Commission Meeting #1 – Task 1 concludes at Commission Meeting #1, where our team will present the following:

Executive summary of outreach and participation
Community priorities and recurring themes
Site opportunities and constraints
Project vision and guiding principles
Criteria to guide development of the three concepts
Pop-Up Events #1-4 Four pop-up events will meet residents where they already gather. The Halloween Carnival and Seniors Coffee will introduce the project and promote the survey.

The State of the City will be the first public presentation of the grant concept and will promote the workshop. The Tree Lighting will present the refined grant concept and collect final feedback before submittal.

Workshop #1 – A single 4-hour community workshop on November 14 at the Stephenson Center will present the project vision, community needs, and the grant concept, and collect feedback to support one refinement before the grant application.

Grant Outreach Schedule of Events
Event
No.

Event/Activity Date Time Location Purpose KH
Staff
Pop-Up #1 Halloween Carnival/Parade 24-Oct 12–3 PM Lomita Park – Belba Field
Awareness pop-up: introduce the project, promote the
survey and workshop, and ask which recreation features the community wants.
2 Pop-Up #2 Seniors
Coffee, Crafts & Chat
27-Oct 2–4 PM Lomita Park –
Tom Rico Center
1 Stakeholder
Meeting #1
Harbor Hills Community TBD TBD Harbor Hills (onsite) Share the project, understand community priorities and concerns, and collect input to shape the grant concept. 2 Stakeholder
Meeting #2
Lomita Little League 24-Oct (before or after
grant application)
TBD TBD Focused conversation with League leadership or a game-day pop-up to collect input on field needs and recreation features. 2 Workshop
Session
City Council Working Session TBD TBD TBD Review the proposed grant concept and provide direction before its first public presentation.
2 Pop-Up #3 Lomita State of the City 12-Nov 12–1:30 PM Lomita Park – Gymnasium
First public presentation of the grant concept; promote the community workshop.
1 Workshop #1 Community Workshop 14-Nov (TBD) 4 hours (tbd) Stephenson Center Present the project vision, community needs, and grant concept; collect feedback to support one refinement.
2 Pop-Up #4 Lomita Tree Lighting 4-Dec 5:30–8 PM Downtown Lomita – City Hall
Present the refined grant concept following the workshop and collect final community feedback.
1 City Council
Meeting
Grant Resolution TBD TBD Lomita City Hall Council adpots a resolution supporting the grant application, as the grant requires.
0 Grant Application Due December 17
8 Tuesday, October 20, 2026 Reg CC MTG, Page *97
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Engagement Documentation – At every Task 1 outreach event, the team will collect photo release forms and prepare a brief summary documenting attendance, key themes, and photographs, along with a running summary of survey results. These summaries will support the grant application.

Grant Concept – Using input from the October outreach events and stakeholder meetings, Kimley-Horn will develop one high-level, color-rendered grant concept that test-fits program capacity and site organization and defines the project’s recreation features. As part of concept development, Kimley-Horn will prepare a planning-level construction cost estimate and evaluate the concept against the $8.5 million maximum grant request. Based on this evaluation, Kimley-Horn will work with the City to either define a project that can be completed within the $8.5 million grant limit or develop a phased approach that clearly identifies the improvements the grant would fund and distinguishes them from potential future improvements. • Concept package:
ƒ One color-rendered site plan illustrating program and amenity information ƒ Conceptual three-dimensional visualizations (up to three views) ƒ Precedent images of proposed amenities
ƒ Planning-level construction cost estimate and potential phasing strategy aligned with the $8.5 million maximum grant request • Concept iterations: Up to four (4) concept iterations are included. These iterations are anticipated to address:
ƒ (1) City staff review
ƒ (2) City Council direction
ƒ (3) Community feedback received during the Weekend Community Workshop ƒ (4) Final revisions needed to support the grant application At this early stage, Kimley-Horn intends to use AI-enabled workflows, directed by the design team, to rapidly generate conceptual visualizations and enable the team to complete the concept in time for the grant application. The images will be clearly identified as illustrative only and are intended to communicate potential character, scale, and experiential qualities. The design team will remain responsible for the underlying ideas, design direction, and selection of presentation imagery. This accelerated approach allows the City and community to explore a broader range of possibilities within the grant schedule before investing significant time and resources in detailed design.

City Council Working Session – The City Council Working Session would occur during Task 1 because development of the grant concept is being advanced to support the grant application.

This allows the City Council to review and provide direction on the proposed grant concept before it is first shared publicly at the State of the City on November 12. Input from the working session will be incorporated into the grant concept presented during the November and December outreach events.

Commission Meeting #1 (early December 2026) – Task 1 concludes with Commission Meeting #1 in early December, followed by grant submittal by December 17. At Commission Meeting #1, our team will present the following:
• Executive summary of outreach and participation
• Community priorities and recurring themes
• Site opportunities and constraints
• Project vision and guiding principles
• Grant concept, recreation features, and planning-level cost estimate • Grant application status and parameters for the Task 2 alternatives 9 Tuesday, October 20, 2026 Reg CC MTG, Page *98
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Deliverables:
ƒ Project branding and an updated PublicCoordinate project website with an interactive map and survey (bilingual [English/Spanish]) ƒ Per-event engagement summaries
ƒ Survey results summary
ƒ Grant concept package
ƒ One (1) color-rendered site plan
ƒ Conceptual three-dimensional visualizations with up to three (3) views ƒ Precedent images
ƒ Planning-level cost estimate and potential phasing strategy aligned with the $8.5 million maximum grant request ƒ City Council Working Session presentation and attendance ƒ Commission Meeting #1 presentation and attendance
ƒ Kick-off meeting agenda and notes
ƒ Up to twelve (12) biweekly progress meetings, with an agenda and action-item notes for each ƒ Monthly invoices and progress reports
ƒ Comment-resolution and decision log
ƒ Four (4) pop-up events (Halloween Carnival, Seniors Coffee, State of the City, Tree Lighting), with display boards, a flyer, comment cards, and a survey QR code ƒ One (1) community workshop (one [1] 4-hour session), with a presentation, display boards, interactive exercises, sign-in sheets, and comment cards ƒ Two (2) stakeholder meetings (Harbor Hills Community and Lomita Little League), with an agenda and meeting summary for each ƒ One-page summary for each pop-up and stakeholder meeting, and a workshop summary memo 10 Tuesday, October 20, 2026 Reg CC MTG, Page *99
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
TASK 2 – Imagine the Opportunity
GOALS: First, establish realistic expectations for the park based on the site’s physical limitations and the public’s desired amenities; and second, to explore a range of design solutions, from low to high impact, while developing initial project costs.

During Task 2, we will work with the City’s Project Team to establish planning level cost targets that serve as practical benchmarks based on potential funding capacity. With that framework established, we will work with the City’s Project Team to determine the strategies each of the three concept designs will explore. Our goal is to produce three genuinely distinct concepts, not variations on a single plan differentiated only by cost. Each concept will stand on its own as a viable solution, testing a meaningful range of outcomes grounded in community and stakeholder priorities, exploring different approaches to site organization, and including a ROM cost estimate.

Grant Concept Variations
Kimley-Horn will prepare three high-level, color-rendered variations that test different layouts, amenity configurations, field surfacing, parking, phasing, and programming. The variations will be reviewed with City staff during a design working session held as part of a regularly scheduled progress meeting. Based on City staff direction, Kimley-Horn will prepare a complete design package and planning-level cost estimate for each variation. Grant Concept Variation Packages (3 Total) – Each will include:
• A color-rendered site plan that demonstrates:
ƒ Program and amenity information
ƒ Vehicular and pedestrian circulation
• Parking count based on planning assumptions agreed to by the City and project team • Summary statement of opportunities, limitations, and tradeoffs • Conceptual three-dimensional visualizations (maximum of three views) • Planning-level cost estimate • Concept Level Design Narrative
ƒ Describes design intent, program, and major design features ƒ Summary of how the concept responds to community input • Concept Level Diagram
ƒ Bubble Diagram outlining circulation, access, program elements ƒ Demonstrates relationship of major features and hieracrchy of spaces AI-Enabled Visualizations
Like Task 1, Kimley-Horn will continue to use AI-enabled workflows, directed by the design team, to efficiently generate illustrative visualizations for each variation. The design team will remain responsible for the concepts, design direction, and selection of presentation imagery. Once a preferred concept is selected, Task 3 will include development of the complete park site plan in AutoCAD and creation of a three-dimensional visualization model in SketchUp or Rhino.

ACTIVE

RECREATION
PLAY
MOVE

COMPETE

NATURE &

LANDSCAPE

RESTORATIVE
BUFFER

ECOLOGY

SUPPORT &

AMENITIES

RESTROOMS

CONCESSIONS

STORAGE

COMMUNITY

GATHERING
EVENTS

MARKETS

PERFORMANCES

ENTRY &

ARRIVAL

WELCOME
ORIENT

CONNECT

PARKING &
ACCESS

CONVENIENT
SAFE

EFFICIENT

FIELDS &
COURTS

FLEXIBLE

MULTI-USE HEART OF ALL AGES

THE PARK GATHER

CONNECT

CELEBRATE
PLAY &
LEARN

INCLUSIVE

CREATIVE

ALL ABILITIES
11 Ai rendering
Tuesday, October 20, 2026 Reg CC MTG, Page *100
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Finding the Right Parking Balance
Parking will be one of the project’s most impactful planning challenges. Most agencies do not have fixed parking requirements for sports fields and recreation areas, which can make determining the appropriate amount of parking to provide a serious challenge.

Too much parking can consume the limited amount of land available and too little parking could create operational problems for neighbors and park users. We will need to consider typical weekday and weekend use, peak hours, overlapping league schedules and potential for tournament weekends and special events.

The three concepts will test parking counts along with the park program being proposed by each option using planning level assumptions agreed to by the City’s Project Team. We may determine that a more detailed parking study is warranted prior to the next phase to fully understand all the activity to determine if the City should be looking for potential overflow sites or shared/offsite parking that could be utilized for larger events so the size of the day-to-day lot could be the most efficient.

City Council Working Session – Prior to presenting the grant concept alternatives to the public, Kimley-Horn will facilitate a working session with City Council to review the three draft alternatives, planning-level cost estimates, key tradeoffs, and implementation considerations. This meeting will provide Council an opportunity to ask questions, confirm the alternatives are appropriate for public review, and help ensure the information presented to the community reflects options the City is comfortable advancing through the engagement process.

Pop-Up Event #5 – The fifth pop-up event will be the community’s opportunity to review and provide feedback on three grant concept variations. The event will reach residents who may not attend a traditional meeting and promote Workshop #2.

Workshop #2 – The second community workshop will showcase the creative vision behind each of the three concepts through compelling 3D visualizations. Our goal is to close the feedback loop by clearly demonstrating:

1. We heard them

2. How the refined concept reflected what we heard

3. Identify program elements that did not make it into the final concept and

4. Why the particular trade-offs that were selected make sense for the community as a whole even if it leaves a certain stakeholder group with less than they hoped for.

Commission Meeting #2 – Task 2 concludes at Commission Meeting #2, where our team will present the following updates:

Updated Executive Summary of Outreach and Participation with additional inputs received from Pop-Up and Workshop #2
Present the Three Concept Designs and 3D Visualizations Present the refined ROM
Estimates for each concept
Determine Preferred
concept to advance
Local Knowledge Matters
We understand the unique parking constraints surrounding the site, including the absence of on-street parking along Caltrans-owned Western Avenue, limited parking availability on portions of Palos Verdes Drive North, and the permitonly parking program serving the nearby Peninsula Verdes neighborhood. Accommodating park users while preventing overflow parking impacts to the Harbor Hills community will be a critical consideration throughout planning and design. 12 Ai Rendering
Tuesday, October 20, 2026 Reg CC MTG, Page *101
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
TASK 3 – Refining the Opportunity
GOAL: Refine the preferred concept into an implementable, consensus-backed plan.

Task 3 begins with identifying a preferred concept based on the three alternatives, community feedback received throughout the process, and the planning-level cost estimates. In our experience, the preferred concept is rarely one of the alternatives presented exactly as shown. Rather, it is typically a hybrid that combines the strongest organizing framework from one concept with the most supported features and amenities from the others. This phase is where the planning process comes together, balancing community priorities, site constraints, parking considerations, operational needs, and project costs to create a single, implementable vision for the site.

Our design team will then proceed to develop the preferred concept more completely in AutoCAD and start to build out the 3D Model (in Sketchup or RhinoMax). As the preferred concept develops we will consider the following criteria:
• Programming, Flexibility, Multi-Use scenarios and
Neighborhood compatibility
• Community Center, Special Events, Concessions,
Restrooms, and Storage
• Accessibility, Inclusion, and Universal Design
• CPTED Principles including Safety, visibility,
and nighttime use
• User comfort, tree canopy and shade
(Combatting heat island effect)
The preferred concept design package is anticipated to include:

Cost and Funding Strategy
Many of the technical studies needed for final design and construction documents will not be available during this initial design phase but we will lean on our decades of experience building sports parks to develop key assumptions so that reasonable allowances can be included in the planning and estimating process. This refined estimate will distinguish between construction costs, construction allowances, design contingency, escalation, GC profits and soft costs to develop a full picture of what lies ahead for the City.

Workshop #3 – The third community workshop will present the refined site plan of the preferred concept, 3D visualizations and supporting exhibits to paint the completed picture for the community and stakeholders. Our goal is to demonstrate to the community how Workshop #2 influenced the final design of the preferred concept and address any remaining concerns.

Commission Meeting #3 & City Council Meeting – Task 3 concludes with Commission Meeting #3, followed up with presentation to the City Council. We have included time in our schedule to continue to refine the documentation between Workshop #3, Commission meeting #3 and the City Council Presentation. At these final two public presentations our team will present the following updates:
• Updated Executive Summary of Outreach and Participation with additional inputs received from Workshop #3
• Present the Preferred Concept Design, 3D Visualizations, and Design Package • Present the final Cost Estimate based on the preferred concept and assumptions
ƒ Hardscape and Landscape materials
ƒ 3D Views of the model
ƒ (1) Bird’s Eye View
• Color Rendered Site Plan with callouts
• Preliminary Grading, Drainage, and
Utility Plan with callouts
• Precedent Image Board(s) • (3-5) Close-up Views depicting focal areas • Refined Cost Estimate with noted Allowances
• Preliminary Phasing Exhibit and Implementation Considerations • Supporting exhibits required for public and decisionmaker presentations • Water efficient Landscape Principles
(Is RW available or will be?)
• Grading & Drainage / Stormwater & Water Quality
• Constructability & Phasing, O&M, lifecycle considerations CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
13 Ai Rendering
Tuesday, October 20, 2026 Reg CC MTG, Page *102
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
At the end of this process the City will have the following:

A broadly supported, community-informed preferred concept design to proceed with into Phase 2. This includes a visually striking design package suitable for public communications and funding discussions Documented outreach findings and backup documentation consistent with Measure A requirements A refined planning-level cost estimate and Implementation Framework A clear set of assumptions and “next steps” to carry out in the form of technical studies and reports to support the City’s Project Team as they pursue Phase 2
Future Considerations
Our experience tells us that planning efforts of this nature often uncover opportunities and questions that warrant additional study beyond the scope of Phase 1. One example may be a comprehensive parking demand analysis to better understand day-to-day operations, special events, and long-term parking needs. Another study we are increasingly helping agencies undertake is a Financial and Operational Analysis, which evaluates how programming, partnerships, and event opportunities can support the ongoing operation and maintenance of park facilities.

Traditionally, parks have been viewed primarily as long-term capital and operating obligations. Increasingly, however, communities are exploring ways to activate these spaces through programming and partnerships that generate revenue, offset operating costs, and increase community value. Identifying these opportunities early in the planning process allows the City to make informed decisions about future investments, prioritize follow-on studies, and develop a clearer roadmap for both capital improvements and long-term operations.

Our Measure of Success
Success is not simply producing an eye-catching site plan and compelling visualizations that showcase exciting new amenities, although we will certainly do that. Success is giving the City of Lomita and its residents a vision that balances creativity with practicality, community priorities with site constraints, and project aspirations with long-term affordability and maintainability.

We have intentionally structured this process to help the City avoid advancing a concept that proves difficult to fund, construct, or maintain. Through iterative testing, community engagement, parking analysis, and cost estimating, we seek to identify challenges early, reducing the likelihood of significant value engineering later that can compromise project goals and erode community trust. By entrusting Kimley-Horn with this process, the City will benefit from a team that pairs creative thinking with disciplined analysis. The result will be a community-supported vision, a clear understanding of cost implications, and a practical path forward from planning to construction.

TASK 4 – Grant Application Services
GOAL: Prepare a complete, competitive Statewide Park Program Round 5 application.

Kimley-Horn will lead preparation of the complete grant application, coordinate required inputs with the City, and provide the application package to the City for submittal. Kimley-Horn’s grant preparation services will include the following:
14 Ai Rendering Tuesday, October 20, 2026 Reg CC MTG, Page *103 TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
• Task 4.1 Application Forms – Prepare the required application forms for City review and signature:
ƒ Project Application Form (DPR 832A)
ƒ Project Timeline Form (DPR 832B)
ƒ Community FactFinder Report and Certification (DPR 832E) ƒ Funding Sources Form (DPR 859)
ƒ Application Checklist (DPR 219)
ƒ Budget Narrative
ƒ Copyright License Agreement for application photographs (DPR 992A) • Task 4.2 Application Narrative – Prepare responses to each scoring criterion, including community-based planning, need for park access, proposed recreation features, climate vulnerability, how Task 1 engagement shaped the design, and health and other partnerships. • Task 4.3 Exhibits – Prepare the following application exhibits: Task 4.3 Exhibits – Prepare the following application exhibits:
ƒ One grant concept site plan developed under Task 1
ƒ One location map
ƒ One vicinity map showing the Community FactFinder half-mile radius ƒ Existing-conditions photo log with up to 10 images
ƒ One conceptual rendering package with up to three views, developed under Task 1 • Task 4.4 Cost Estimate – Prepare the construction cost estimate in accordance with grant requirements and complete Form DPR 832C. • Task 4.5 Community Engagement Documentation – Create engagement documentation package, including the event log, photographs and releases, survey results, and a summary of how community input shaped each recreation feature.

Kimley-Horn will compile the City-provided attachments and prepare one (1) complete draft application for one consolidated round of City review. Kimley-Horn will incorporate the City’s consolidated comments and provide a final application package to the City. The City will be responsible for submitting the application.

Deliverables:
ƒ Community FactFinder report
ƒ Draft and final DPR forms
ƒ Application narrative
ƒ Exhibits
ƒ Construction cost estimate and budget narrative
ƒ Engagement documentation package
ƒ Final application package incorporating one (1) consolidated round of City comments for City submittal 15 Tuesday, October 20, 2026 Reg CC MTG, Page *104
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Assumptions:
ƒ The City will schedule the required City Council meeting and prepare the staff report and authorizing resolution before the application deadline. ƒ The City will provide required signatures on all application forms. ƒ The City will provide documentation demonstrating control of the project site. ƒ The City will confirm and provide the project’s CEQA status. ƒ The City will obtain and provide letters of support from project partners. ƒ The City will submit the application.
ƒ Project management and coordination have been increased to account for grant application management and coordination of the additional outreach events with City staff and event organizers on the accelerated grant schedule.
ƒ The City will have full ownership of the site by the grant submittal date. ƒ The grant request is assumed to be up to $8.5 million. Planning-level cost estimates will be used to determine whether the project can be delivered within the maximum grant amount or should be presented as a phased project that clearly identifies the improvements funded by the grant and those reserved for a future phase. No local match or additional committed funding is assumed unless identified by the City.
ƒ The grant concept developed in Task 1 defines the project’s recreation features. Task 2 variations and the Task 3 preferred concept will remain consistent with those features. ƒ The City will provide event access, booth space, and coordination with event organizers, and will distribute promotional content through its website, City app, social media, and water bill inserts (printing and mailing by the City).
ƒ Other direct costs have been increased to cover printed materials, display boards, and supplies for the six additional pop-up events and the second day of the Weekend Community Workshop.
ƒ The City is the grant applicant and will provide required administrative attachments, signatures, and any governing body resolution. ƒ Grant award is not guaranteed.
ƒ The schedule assumes the City will confirm outreach event dates and locations, schedule the City Council Working Session before the State of the City, and provide consolidated reviews, decisions, signatures, and administrative attachments by mutually agreed deadlines. Delays in City-provided information or approvals may affect the grant application schedule. 16 Tuesday, October 20, 2026 Reg CC MTG, Page *105
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Led by Laura Forinash, PE, TE, our team is organized around three core disciplines: Public Engagement, Civil Engineering, and Landscape Architects. Our planners, engineers, and landscape architects participate directly in outreach activities alongside our bilingual engagement team, ensuring community input is incorporated into planning and design decisions as they are being developed. This collaborative structure brings together professionals with extensive experience in Measure A-funded projects, municipal project delivery, and Southern California park planning.

Org Chart
C. ORGANIZATION AND STAFFING
*Bilingual Team Members
Civil Design
Barsin BetGovargez, PE - Lead
Site Design
Ahmed Zuwawa, PE
Javier Delgado, ENV SP*
Michael Liao, EIT
Parking & Circulation
Darryl dePencier, AICP, GSIP, RSP2B
Angelo Pastelin, PE*
Public Engagement
Maya Bouchet, AICP - Lead
Outreach Team
Tatiana Lundstrom, RSP1
Fabian Campos, AICP*
Angelo Pastelin, PE*
Website & Survey
Emma Sorto*
Translation & Interpretation
Rossina Chichiri*
Landscape Design
Michael Ledbetter, PLA - Lead
Landscape Support
Grace Pan
Nick Lee
Visualization, Graphical Design &
Renderings
Catherine Sachs
Julian Lopez*
Park Planning & Concept Design
City of Lomita
Project Manager &
Point of Contact
Laura Forinash, PE, TE
QC/QA Manager
Michael Madsen, PLA, CLIA
Principal-in-Charge
Sri Chakravarthy, PE, TE
Bold = Key Staff
ORGANIZACIÓN Y ASIGNACIÓN DE PERSONAL
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
17 Tuesday, October 20, 2026 Reg CC MTG, Page *106
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Expected Staff Contributions
Staff Member Role % Total Effort
PROJECT MANAGEMENT & OVERSIGHT 15%
Laura Forinash, PE, TE Project Manager & Point of Contact 10% Sri Chakravarthy, PE, TE Principal-in-Charge 2%
Michael Madsen, PLA, CLIA QC/QA Manager 3%
PUBLIC ENGAGEMENT 35%
Maya Bouchet, AICP Public Engagement Lead 16%
Tatiana Lundstrom, RSP1 Outreach Team 5%
Fabian Campos, AICP Outreach Team 4%
Emma Sorto Website & Survey 7%
Rossina Chichiri Translation & Interpretation 3%
CIVIL ENGINEERING & SITE PLANNING 20%
Barsin BetGovargez, PE Civil Design Lead 6%
Ahmed Zuwawa, PE Site Design 3%
Javier Delgado, ENV SP Site Design 3%
Michael Liao, EIT Site Design 3%
Darryl dePencier, AICP, GSIP, RSP2B Parking & Circulation 2% Angelo Pastelin, PE Parking & Circulation / Outreach 3% PARK PLANNING & LANDSCAPE DESIGN 30%
Michael Ledbetter, PLA Landscape Design Lead 12%
Nick Lee Landscape Support 7%
Grace Pan Landscape Support 4%
Catherine Sachs Visualization, Graphics & Renderings 4% Julian Lopez Visualization, Graphics & Renderings 3%
100%
18 Tuesday, October 20, 2026 Reg CC MTG, Page *107
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Availability Statement
We have selected a seasoned team of professionals who offer the high level of responsiveness you need for this project. The depth of our staff and our familiarity with the needs of municipalities allow us to maximize our coordination efforts while integrating resources, adhering to project schedules, and managing budgets. With these processes in place, we can meet the technical and staffing needs anticipated for this project to begin in October 2026.

Kimley-Horn uses a proactive management system, known as Castaheads, to detail every project’s personnel needs and determine each staff person’s availability. Our Castaheads system is an accurate tool for keeping our projects on schedule by continuously matching project needs with staff availability. Based on a review of our Castaheads, our proposed staff members are available immediately to serve you and can handle the project workload. Please note this team structure and availability align with this project’s budget and timeline. We understand the workload will span over the number of months identified, and our availability can be balanced to meet the needs of this project.

Transition Plan
Beyond the names on the organizational chart, Kimley-Horn has more than 10,000 staff across the firm we can lean on for additional capacity, as needed, and Laura Forinash, PE, TE has the authority to mobilize them at any given time to meet your needs for this contract. Shifting staff to contracts, projects, and offices in other locations is Kimley-Horn’s culture and very routine, so the City will receive highly qualified staff, especially in the event that there are proposed changes in key personnel during the term of the Agreement that are outside of our control or if the City requests such change.
19 Tuesday, October 20, 2026 Reg CC MTG, Page *108
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Resumes
Please find our key staff resumes beginning on the following page.

D. STAFF QUALIFICATIONS AND EXPERIENCE

CUALIFICACIONES Y EXPERIENCIA DEL PERSONAL
20 Tuesday, October 20, 2026 Reg CC MTG, Page *109
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Hawthorne General Plan Update
Kana Road and Augora Road Intersection Improvement Project Education and Credentials
ƒ Master of Science, Civil Engineering, Georgia
Institute of Technology
ƒ Bachelor of Science, Civil Engineering, Georgia
Institute of Technology
ƒ Professional Engineer in
California, License #93146
ƒ Traffic Engineer in California, License #2818
Laura is a professional civil and traffic engineer with 14 years of experience partnering with public agencies throughout Southern California to deliver community-driven planning, transportation, and capital improvement projects. From 2018 to 2024, she served as the City Traffic Engineer for Agoura Hills, where she advised City staff, commissions, and elected officials on transportation, infrastructure, and public works initiatives, contributed to the Capital Improvement Program, secured grant funding, and advanced long-range mobility goals. In addition to providing long-term staff augmentation support for the cities of Laguna Niguel and Hawthorne, Laura has delivered projects for numerous municipalities throughout Los Angeles County and the South Bay. Her experience includes community engagement programs, active transportation planning, corridor and streetscape studies, Safe Streets and Roads for All Action Plans, school circulation improvements, and grant-funded capital projects. Laura is recognized for her collaborative approach and ability to work effectively with City staff, stakeholders, elected officials, and community members. She excels at building consensus, navigating municipal processes, and translating community priorities into practical, implementable solutions that balance technical, operational, and funding considerations.

Relevant Experience
ƒ City of Lomita, Traffic Calming Toolkit, Lomita, CA — Project Manager ƒ City of Lomita, Third Party Review of Local Travel Network on Eshelman Avenue, Lomita, CA — Project Manager ƒ City of Rancho Palos Verdes, Roundabout Feasibility Study, Rancho Palos Verdes, CA — Project Manager ƒ City of Ventura, Westside Community Wide Active Transportation Improvements, Ventura, CA — Project Manager
ƒ City of Agoura Hills, Local Roadway Safety Plan with Vision Zero Strategy, Agoura Hills, CA — Project Manager
ƒ City of Agoura Hills, Bicycle Master Plan, Agoura Hills, CA — Project Manager ƒ City of Agoura Hills, Citywide School Circulation Study, Agoura Hills, CA — Project Manager ƒ City of Agoura Hills, Mobility Element Update and Evacuation Analysis, Agoura Hills, CA — Project Manager
ƒ City of Agoura Hills, On-Call Traffic Engineering and Safe Routes to School (SRTS) Services, Agoura Hills, CA — Project Manager
ƒ City of Agoura Hills, Kanan Road and Agoura Road Intersection Improvement Project, Agoura Hills, CA — Project Manager
ƒ City of Hawthorne, Professional Traffic Engineering Services On-Call, Hawthorne, CA — Project Manager ƒ City of Hawthorne, Safe Streets for All Safety Action Plan, Hawthorne, CA — Project Manager ƒ City of Hawthorne, Citywide Parking Study, Hawthorne, CA — Project Manager ƒ City of Hawthorne, General Plan Update, Hawthorne, CA — Mobility Lead ƒ City of Laguna Niguel, Traffic Manual and Neighborhood Traffic Management, Laguna Niguel, CA — Project Manager
Project Manager

LAURA FORINASH, PE, TE
21 Tuesday, October 20, 2026 Reg CC MTG, Page *110
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
City of Los Angeles, Broadway-Manchester Active Transportation LA DORP, Griffith Park Safety and Mobility Active Transportaiton Project Education and Credentials
ƒ Master of Science, Civil Engineering, Louisiana
State University
ƒ Bachelor of Science, Civil Engineering, Kakatiya
University, India
ƒ Professional Civil Engineer in
California, License #73629
ƒ Professional Traffic Engineer in
California, License #2531
ƒ ITE, Member and Past President, Southern
California Section
Sri has more than 22 years of traffic operations and transportation engineering experience.

He began his career with the County of Los Angeles before joining Kimley-Horn and has participated in a wide variety of capital improvement projects and on-call engineering services.

His project management expertise is informed by his County experience and knowledge of grant funding and stakeholder coordination. He has overseen medium to large scale projects for local and regional agencies with budgets from $50K to $2.5M and schedules from six months to 3.5 years. Sri frequently coordinates multidisciplinary projects involving local and regional agencies, Caltrans, and local communities, and has presented projects to City Council, Planning Commissions, and Boards. He is a Past President of the Institute of Transportation Engineers (ITE), Southern California Section.

Relevant Experience
ƒ City of Los Angeles, Department of Recreation and Parks, Griffith Park Safety and Mobility Active Transportation Project, Los Angeles, CA — Principal-in-Charge ƒ City of Los Angeles, Broadway-Manchester Active Transportation Equity Project, Los Angeles, CA — QC/QA Manager
ƒ City of Los Angeles, Mission Mile Sepulveda Project PA&ED, Los Angeles, CA — Senior Traffic Engineer ƒ County of Los Angeles, Bicycle Master Plan Update, Los Angeles County, CA — Project Manager ƒ City of Santa Clarita, On-Call General Engineering Services, Santa Clarita, CA — Project Engineer ƒ City of Pasadena/Rose Bowl Operating Company, Event Traffic and Pedestrian Study, Los Angeles, CA — Project Engineer
ƒ City of Pasadena/Rose Bowl Operating Company, Parking Study, Pasadena, CA — Project Engineer ƒ City of Agoura Hills, On-Call Traffic and Civil Engineering Services, Agoura Hills, CA — Contract Manager ƒ City of Agoura Hills, Agoura Road Widening Complete Streets Project, Agoura Hills, CA — Principal In Charge
ƒ City of Agoura Hills, Local Roadway Safety Plan, Agoura Hills, CA — Principal In Charge ƒ City of Agoura Hills, Bicycle Master Plan, Agoura Hills, CA — Principal In Charge ƒ City of Malibu, On-Call Civil and Traffic Engineering Services, Malibu, CA — Contract Manager ƒ City of Malibu, Pacific Coast Highway Mobility Improvements at Various Locations, Malibu, CA — Project Manager
ƒ City of Norwalk, On-Call Professional Engineering Services for Design, Project Management, and Construction Support Services, Norwalk, CA — Project Manager ƒ City of South Gate, As-Needed Engineering Services, South Gate, CA — Project Manager ƒ City of Lancaster, Multi-Year Professional Engineering Services, Lancaster, CA — Project Manager Principal In Charge

SRI CHAKRAVARTHY, PE, TE
22 Tuesday, October 20, 2026 Reg CC MTG, Page *111
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
City of National City, Kimball Park Master Plan Improvements City of Cula Vista and Meridian Development, Mellenia Park Education and Credentials
ƒ Master of Landscape Architecture,
University of Florida
ƒ Bachelor of Science, Business Administration,
Florida State University
ƒ Professional Landscape Architect in
California, License #5798
ƒ Certified Landscape Irrigation
Auditor (CLIA), #92638
ƒ Council of Landscape Architectural Registration
Boards (CLARB), #21623
Michael has more than 22 years of landscape architectural experience in strategic planning, master planning, streetscapes, site design, amenity areas, and planting and irrigation design with direct QA/QC experience on public agency, transportation, park, and recreation projects.

His review approach emphasizes clear communication protocols, early workplan and schedule review, interdisciplinary coordination, document control, independent senior review, and timely resolution of comments so that the team’s deliverables remain accurate, consistent, and aligned with City goals. Michael’s landscape architectural background in sports and recreation facilities, public parks, complete streets, planting, and irrigation design allows him to evaluate concepts for technical feasibility, accessibility, maintainability, sustainability, water-efficient design, cost awareness, and consistency with community input.

Relevant Experience
ƒ City of Palm Springs, Demuth Pickleball Expansion, Palm Springs, CA — Project Manager/Landscape Architect ƒ City of Palm Springs, Demuth Park Dog Park Renovations, Palm Springs, CA — Landscape Architect ƒ Town of Apple Valley, Engineering and Design Services for the Civic Center Park Pickleball Project, Apple Valley, CA — Project Manager, Landscape Architect
ƒ City of Banning, Lions Park Irrigation Conversion Project, Banning, CA — Project Manager, Landscape Architect
ƒ City of Chula Vista and Meridian Development, Millenia Park, Chula Vista, CA — Project Manager, Landscape Architect
ƒ City of Fontana, Seville Park Pickleball, Skatepark, and Pump Track Design, Fontana, CA — Project Manager, Landscape Architect
ƒ City of Hollister, Water Reclamation Recreation Facility Concept Design, Hollister, CA — Project Manage, Landscape Architect
ƒ GOALS Soccer Centers, GOALS South Gate Soccer Center, South Gate, CA — QC/QA Manager ƒ City of National City, Kimball Park Master Plan Improvements, National City, CA — Landscape Architect ƒ City of National City, Paradise Creek Educational Park, National City, CA — Project Manager, Landscape Architect
ƒ City of National City, El Toyon Park Master Plan, National City, CA — Landscape Architect ƒ City of Brawley, Alyce Gereaux Park Renovations, Brawley, CA — Landscape Architect ƒ City of San Diego, Crown Point Park Renovations, San Diego, CA — Landscape Architect ƒ City of Escondido, Washington Park Skate Spot, Escondido, CA — Landscape Architect ƒ City of El Centro, Engineering Design and Architectural Design Services for Plank Park, El Centro, CA — Landscape Architect
ƒ City of Burbank, Burbank Bike Trail, Burbank, CA — Landscape Architect QC/QA Manager

MICHAEL MADSEN, PLA, CLIA
23 Tuesday, October 20, 2026 Reg CC MTG, Page *112
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
LAUSD, Design-Build Athletic Facilities Upgrade for Roosevelt High Temple City High School, Athletic Facilities Upgrade
Education and Credentials
ƒ Master of Science, Structural Engineering,
California State University, Northridge
ƒ Bachelor of Science, Civil Engineering, Azad
University of Ormiyeh, Iran
ƒ Professional Engineer in California,
License #817151
Barsin is a California-registered civil engineer with more than 23 years of experience across a wide variety of land development projects. A results-driven problem solver, he brings extensive experience taking projects through permitting for multiple cities in Southern California. He has proven abilities to manage the design process from start to finish, with particular depth in civil and grading engineering for public infrastructure, educational facilities, parks, and community centers. He has served as Engineer of Record on multiple public infrastructure and community projects and has a strong understanding of cost estimation and analysis for effective budget management.

Relevant Experience
ƒ City of Santa Clarita, Santa Clarita Sports Complex Build-Out, Santa Clarita, CA — Project Manager/Engineer of Record
ƒ Temple City High School, Athletic Facilities Upgrade (Baseball/Softball, Football Stadium, Tennis Courts, Restrooms and Concession Buildings), Temple City, CA — Engineer of Record ƒ Duarte Unified School District, Duarte High School Sports Complex, Duarte, CA — Engineer of Record ƒ Duarte Unified School District, Duarte High School Tennis Courts Improvements, New Gymnasium, and Site Improvements Project, Duarte, CA — Engineer of Record/Project Manager* ƒ LAUSD, Design-Build Athletic Facilities Upgrade for Garfield High School and Roosevelt High School, Los Angeles, CA — Engineer of Record
ƒ City of Irvine, Northwood Community Park Playground and Outdoor Fitness Improvements Project, Irvine, CA — Project Manager/Engineer of Record
ƒ City of Irvine, Portola Springs Community Park, Indigenous Interpretive Space, Irvine, CA — Project Manager/Engineer of Record
ƒ Riverside County Regional Park and Open Space District, Kabian Park Improvement Project, Riverside County, CA — Project Manager/Engineer of Record ƒ City of Santa Ana, Santa Anita Community Center, Santa Ana, CA — Engineer of Record ƒ City of Santa Ana, Chepa Park Improvements, Santa Ana, CA — Engineer of Record ƒ City of Santa Ana, Santa Ana Zoo Walkway Project, Santa Ana, CA — Engineer of Record ƒ El Dorado County, Diamond Springs Community Park, El Dorado County, CA — Engineer of Record ƒ Saddleback College, Quad Improvements, Mission Viejo, CA — Project Manager/Engineer of Record ƒ Saddleback College, Fine Art Plaza Improvements and ADA Upgrades, Mission Viejo, CA — Project Manager/Engineer of Record
ƒ Irvine Valley College, Quad Improvements and ADA Upgrades, Irvine, CA — Project Manager Planning and Conceptual Lead

BARSIN BETGOVARGEZ, PE
24 Tuesday, October 20, 2026 Reg CC MTG, Page *113
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
City of Signall Hill, Civic Center Master Plan
City of Santa Ana, Santa Anita Community Center
Education and Credentials
ƒ Bachelor of Science, Landscape Architecture,
University of Kentucky
ƒ Professional Landscape Architect in
California, License #5553
Michael is a landscape architect with more than 26 years of diverse professional experience.

He joined Kimley-Horn as a Senior Project Manager and Practice Builder. He has extensive design and production management experience, leading projects from entitlements through construction. He has a strong design sense applied across various land development sectors including public parks, urban design, commercial, retail, higher education, and healthcare.

Michael is passionate about sustainable design and focuses on progressive regenerative and resilient design trends. He works closely with civil engineering teams to develop site designs that are functional and meet program objectives with casual elegance, creating enjoyable spaces for all.

Relevant Experience
ƒ City of Santa Clarita, Santa Clarita Sports Complex Build-out, Santa Clarita, CA — Landscape Architect ƒ Duarte Unified School District, Duarte High School Sports Complex, Duarte, CA — Project Manager ƒ Temple City Unified School District, Temple City High School Athletic Facilities Upgrade, Temple City, CA — Landscape Architect
ƒ LAUSD, Roosevelt and Garfield High Schools, Athletic Facilities Upgrade (Design-Build), Los Angeles, CA — Project Manager
ƒ City of Santa Ana, Santa Anita Community Center, Santa Ana, CA — Landscape Architect ƒ City of Santa Ana, Chepa Park and Community Center, Santa Ana, CA — Landscape Architect ƒ City of Santa Ana, Santa Ana Zoo Walkway Improvements, Santa Ana, CA — Project Manager ƒ City of Santa Ana, 17th Street Triangle Park, Santa Ana, CA — Landscape Architect ƒ City of Santa Ana, Warner Avenue Linear Park (Planning), Santa Ana, CA — Landscape Architect ƒ City of Santa Ana, Jerome Park and Cabrillo Park Irrigation Renovations, Santa Ana, CA — Landscape Architect
ƒ City of Santa Ana, On-Call Landscape Architecture Services, Santa Ana, CA — Contract Manager ƒ City of Long Beach, Landscape Architectural Consulting Services On-Call, Long Beach, CA — Contract Manager
ƒ City of Signal Hill, Civic Center Master Plan, Signal Hill, CA — Landscape Architect ƒ City of Anaheim, Anaheim Convention Center Grand Plaza, Anaheim, CA — Project Manager* ƒ City of Lake Forest, Lake Forest Sports Park, Lake Forest, CA — Project Manager* ƒ City of Ontario, Townsquare Park, Ontario, CA — Project Manager* ƒ City of Ontario, Conservation Park, Ontario, CA — Project Manager* ƒ Orange Coast Community College, Aquatics Center, Costa Mesa, CA — Project Manager* ƒ Saddleback College, The Quad, Mission Viejo, CA — Landscape Architect* ƒ Irvine Valley College, B-Quad, Irvine, CA — Landscape Architect* *Prior to Kimley-Horn
Landscape Architecture

MICHAEL LEDBETTER, PLA
25 Tuesday, October 20, 2026 Reg CC MTG, Page *114
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Palm Springs Racquet Club Road Bike Lane and Sidewalk Improvements City of South Pasadena, Huntington-Fremont Corridor Improvements Education and Credentials
ƒ Bachelor of Science, Policy, Planning, and
Development, University of Southern California
ƒ American Institute of Certified
Planners (AICP), #34252
Maya is a transportation planner who is experienced in preparing technical feasibility studies, developing active transportation conceptual designs, creating community outreach campaigns, and leading community outreach workshops. Her technical experience in traffic engineering is complemented by her educational background in urban planning. This compels her to make complex concepts approachable and engage the community in the design process. Maya has led several active transportation outreach programs across Southern California, often involving both in - person and virtual multi - lingual community meetings, presenting to Commissions/Committees and City Councils for approval.

Maya grew up in Santa Monica and is passionate about doing work in a place that is close to home. Over the past year, she has successfully led over 20 community meetings involving active transportation design and helping to build stakeholder consensus.

Relevant Experience
ƒ City of South Pasadena, Huntington-Fremont Corridor Improvements Project, South Pasadena, CA — Community Outreach and Planning Lead
ƒ City of Monterey Park, Monterey Pass Road Complete Streets Project, Monterey Park, CA — Planning and Community Outreach Lead
ƒ City of Monterey Park, Vision Zero Action Plan (SS4A), Monterey Park, CA — Outreach Lead ƒ San Gabriel Valley Council of Governments (SGVCOG), SGV Forward Jump Start Transit Projects, San Gabriel Valley, CA — Deputy Project Manager and Outreach Lead ƒ SGVCOG, San Gabriel Valley Transit Feasibility Study, San Gabriel Valley, CA — Deputy Project Manager ƒ City of Palm Springs, Racquet Club Road Bike Lane and Sidewalk Improvements Project, Palm Springs, CA — Project Manager and Community Outreach Lead ƒ City of Palm Springs, South Palm Canyon Drive Bike Lane and Sidewalk Improvements Project, Palm Springs, CA — Project Manager and Community Outreach Lead ƒ City of Palm Springs, Citywide Pedestrian Crossing Study and Design, Palm Springs, CA — Project Manager
ƒ City of Palm Desert, Portola Avenue Neighborhood Mobility Strategies Study and Community Outreach, Palm Desert, CA — Project Manager and Community Outreach Lead ƒ City of Palm Desert, De Anza Way Corridor Study, Palm Desert, CA — Project Manager and Community Outreach Lead
ƒ City of Calabasas, Lost Hills Road and Agoura Road Bike Lane Design, Calabasas, CA — Project Manager ƒ City of Calabasas, Traffic Engineering On-Call Services, Calabasas, CA — Project Manager ƒ City of Santa Clarita, Newhall Bike Boulevard, Santa Clarita, CA — Project Manager ƒ City of Glendale, Wilson Avenue Multimodal Improvements Project, Glendale, CA — Project Planner ƒ City of Glendale, Colorado Street Multimodal Improvements Project, Glendale, CA — Project Planner Public Engagement Lead

MAYA BOUCHET, AICP
26 Tuesday, October 20, 2026 Reg CC MTG, Page *115
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Firm Experience
Kimley-Horn is a national planning, engineering, and design firm with deep roots in Southern California’s public-sector landscape. We have delivered civic and recreational facility projects, active transportation plans, site-development programs, and bilingual community engagement processes for municipalities, school districts, and regional agencies across Los Angeles County and the broader Southern California region. Our work on sports complexes, park renovations, educational athletic facilities, and community centers reflects a consistent commitment to community-centered design, schedule discipline, and collaborative public-agency delivery.

The team we have assembled for the City of Lomita’s Phase 1 Sports and Community Center engagement reflects the disciplines this project demands: landscape architecture for site concept development and visual communication, civil engineering for grading, drainage, access, utilities, and preliminary cost development, and bilingual public engagement for community workshops, pop-up outreach, survey administration, and stakeholder facilitation. These disciplines work together under a unified project management structure, with the Project Manager serving as the City’s single point of contact and the Principal-in-Charge providing executive-level support and contract authority throughout the engagement.

Our proposed Civil Lead, Barsin BetGovargez, PE, serves as the project’s Engineer of Record. With more than 23 years of civil engineering experience on education, civic, commercial, and city capital improvement projects throughout Southern California, Barsin brings the local knowledge, technical depth, and regulatory familiarity to deliver constructable, cost-informed civil work products appropriate to the Lomita Sports and Community Center’s site and program.

Our team’s bilingual outreach capability is a direct match for this project’s Measure A compliance requirements and communityinclusion goals. Our Public Engagement Lead, Maya Bouchet, AICP, has led community outreach programs throughout Southern California, coordinating in-person workshops, stakeholder engagement, and public comment processes consistent with the inclusive participation standards the City of Lomita must meet.

Across our team, every key personnel member brings at least five years of direct project experience in their respective discipline, and several bring more than two decades of practice in Southern California public-sector work. We have structured this team to operate as a cohesive, integrated unit from kickoff through final City Council presentation, with clear lines of authority and a shared commitment to delivering a community process and concept package that positions the Lomita Sports and Community Center for successful longterm development.

Reference Projects
The following reference projects demonstrate our team’s ability to deliver robust public engagement, civil engineering, landscape architecture, and site-development services for municipal sports complexes, park renovations, and public athletic facilities. Each project was carried by Kimley-Horn as prime consultant or primary discipline provider, working directly with public-agency clients in Southern California on scopes comparable to the City of Lomita’s Phase 1 program. 27 Tuesday, October 20, 2026 Reg CC MTG, Page *116
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Kimley-Horn was selected as the prime consultant for the Santa Clarita Sports Complex Buildout project in the fall of 2022 and is currently working toward 90% Construction Documents while the City reviews the latest construction cost estimate. Kimley-Horn is providing civil engineering and landscape architectural services to the City, with main tasks including refinement of the previously approved master plan and preparation of final PS&E for the park’s development.

This phase of the Sports Complex will include amenities such as full-size multipurpose sports fields, a 400M running track and natural turf soccer field, an expansive inclusive playground, an enlarged dog park, hiking and biking trails, restroom and storage buildings, and a USA BMX sanctioned track capable of hosting national level competitions by USA BMX. In addition to civil engineering services, Kimley-Horn is also responsible for the following services as the project landscape architect:

Santa Clarita Sports Complex Buildout
Santa Clarita, CA
CLIENT CONTACT: Archie Dornidon, Sr. Engineer,
[email protected],
661.225.4353
DATES OF PROJECT: Fall 2022 – Present (planning completed 2025) KEY STAFF INVOLVED: Barsin BetGovargez, PE – Project Manager; Michael Ledbetter, PLA – Landscape Architect
◢ Design of the new irrigation system with large portions of the site utilizing an existing pump system
◢ Design of wayfinding and signage
◢ Selection and layout of new trees, shrubs, and ground covers to be used throughout the grounds
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
28 Tuesday, October 20, 2026 Reg CC MTG, Page *117
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Kimley-Horn provided civil engineering and landscape architecture services for the renovation of Santa Anita Park, a 5-acre neighborhood park originally dedicated in 1970.

The scope included demolition of the existing community center and construction of a new multi-use facility housing a PAAL Center, police substation, and recreation offices.

Exterior improvements included a new outdoor plaza with pedestrian connections to an existing pool, basketball court, and playground. Kimley-Horn’s services covered the full site development workflow: demolition plans, construction plans, hardscape design, grading and drainage plans, utility plans, planting plans, and irrigation plans. This project demonstrates our team’s experience delivering the precise combination of services the Lomita project requires: community center renovation, outdoor recreational infrastructure, and integrated civil and landscape disciplines operating under a public-agency framework.

Santa Anita Park Renovation and Community Center
Santa Ana, CA
CLIENT CONTACT: Victor Rosales, CIP Project Manager, Public Works, [email protected], 951.736.2446
DATES OF PROJECT: 2023 – 2025
KEY STAFF INVOLVED: Barsin BetGovargez, PE – Project Manager; Michael Ledbetter, PLA – Landscape Architecture
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
29 Tuesday, October 20, 2026 Reg CC MTG, Page *118
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
KimleKimley-Horn provided civil engineering and landscape architecture consulting services for a $23 million public school athletic facilities modernization at Temple City High School, under ownership of the Temple City Unified School District. The scope included demolition of existing home and visitor bleachers, a football field, a decomposed granite track, and a baseball/softball field, followed by construction of a new baseball/ softball field with bleachers, a new football stadium with home and visitor seating, a large restroom and concession building, a ticket booth, and a Chemistry Lab Building. The artificial turf fields included a new booster pump and cool down irrigation system. This project demonstrates our Civil Lead’s direct experience managing civil engineering scope for a complex public athletic facility reconstruction in the greater Los Angeles region, including coordination of multiple facility types, campus infrastructure, and constructionphase oversight consistent with the work the Lomita project will ultimately require.

Temple City High School Athletic Facilities Upgrade
Temple City, CA
CLIENT CONTACT: Anthony Salazar, Director of Facility Services and Maintenance, [email protected], 626.548.5038
DATES OF PROJECT: 2023 - 2026
KEY STAFF INVOLVED: Barsin BetGovargez, PE – Civil Engineer; Michael Ledbetter, PLA – Landscape Architecht
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
30 Tuesday, October 20, 2026 Reg CC MTG, Page *119
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Kimley-Horn partnered with the City of Monterey Park to develop a Vision Zero Action Plan funded through the USDOT’s Safe Streets and Roads for All (SS4A) program, with the goal of eliminating traffic fatalities and severe injuries on City streets. Community and stakeholder engagement was a central component of the project. Drawing on direct experience working in Monterey Park, our engagement and outreach team developed a tailored strategy to connect the City with its diverse community, building awareness and consensus around the Action Plan’s vision and implementation priorities. The team organized public workshops, stakeholder interviews, and outreach activities designed to reach residents across cultural and generational lines, gathering input that directly informed the identification of high-priority safety locations and countermeasures.

Monterey Park Vision Zero Action Plan
Monterey Park, CA
CLIENT CONTACT: Ziad Y. Mazboudi, PE, D.WRE, F.ASCE, MBA, LEED AP, CIP, [email protected], 626.307.1330 DATES OF PROJECT: 2025 – Present
KEY STAFF INVOLVED: Darryl dePencier, AICP, GISP, RSP2B – Project Manager; Maya Bouchet, AICP – Engagement Lead CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
31 Tuesday, October 20, 2026 Reg CC MTG, Page *120
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
The Northwood Community Park Renovation Project includes a comprehensive redesign and enhancement of the iconic “Castle Park” playground from the 1980’s and its surrounding amenities. Covering approximately 0.60 acres, the renovation aims to modernize the play environment while preserving the beloved castle theme that has long defined this community landmark. Key improvements include new playground surfacing, age-appropriate play equipment, shade structures, site furnishings, and the addition of six to eight outdoor exercise stations designed to promote wellness and encourage multi-generational recreation. The project also prioritizes critical accessibility upgrades by addressing ADA pathway deficiencies throughout the park and enhancing pedestrian connectivity. The creative design process involved developing conceptual alternatives, engaging with the community and stakeholders, and preparing detailed construction documents at 35%, 60%, 80%, and 100% milestones. Civil engineering support provided solutions for grading, drainage, erosion control, and stormwater management, featuring a subsurface drainage system beneath the play area. Additional project components include topographic surveying and mapping, plan review coordination, permitting, and construction administration. The project team actively participated in community meetings, City Council presentations, and will conduct construction phase site visits to ensure the vision is fully realized.

Northwood Community Park Renovation Project
City of Irvine
CLIENT CONTACT: Sandy Simieng, Senior Project Manager,
[email protected], 949.724.6182
DATES OF PROJECT: 2023 – Present
KEY STAFF INVOLVED: Barsin BetGovargez, PE – Civil Engineer CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
32 Tuesday, October 20, 2026 Reg CC MTG, Page *121
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
The City of Palm Springs selected Kimley-Horn to provide landscape architecture, civil engineering, electrical engineering, and structural engineering support for the design of a new 22-court pickleball facility, including an accessible tournament court, in Demuth Park. The project includes enhancements to pedestrian circulation, fencing, seating, shade structures, signage, landscaping, ground surfacing, pathways, lighting systems, and other amenities to support player and spectator experiences and organized tournaments. The project also includes on-street parking striping improvements along Vella Road. Services include construction support and extensive public outreach to help build community consensus.

Demuth Park Pickleball Expansion Project
City of Palm Springs
CLIENT CONTACT: Alberto Gradilla, Engineering Services, [email protected], 760.323.8253 Ex 8718 DATES OF PROJECT: 2023 - September 2026
KEY STAFF INVOLVED: Michael Madsen, PLA, CLIA – Project Manager; Michael Ledbetter, PLA – Court Layout and Irrigation Design; Maya Bouchet – Outreach
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
33 Tuesday, October 20, 2026 Reg CC MTG, Page *122
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
E. QUALITY CONTROL PLAN
The quality control/quality assurance (QC/QA) plan Kimley-Horn will implement for this project follows the same proven framework we use firmwide to maintain consistency, accountability, and quality for our municipal clients. For the Lomita Sports and Community Center Phase 1 assignment, the process will be tailored to the project’s critical interfaces among bilingual community outreach, stakeholder engagement, conceptual alternatives development, preliminary cost analysis, Measure A compliance documentation, and City Council presentations. The plan includes the following six key elements:

Structure: Each QC/QA plan includes a project manager responsible for contract delivery, technical managers responsible for discipline development, and a QC/QA manager responsible for verifying implementation of the plan. Project Manager Laura Forinash, PE, TE will remain accountable for overall quality, City coordination, day-to-day interdisciplinary integration, tracking of decisions and comment resolution, and final direction on all work products. Each discipline lead will remain responsible for the technical accuracy and completeness of their own work, while Michael Madsen, PLA, CLIA will serve as the independent QC/QA Manager.

Procedures: Outreach materials, engagement summaries, concept drawings, cost estimates, and report deliverables will be checked by qualified staff other than the original preparer. Our color-coded comment process includes an initial check, documented resolution by the preparer, review of completed revisions, and back-checking before comments are closed. Reviews will address bilingual content accuracy, community engagement methodology, conceptual design completeness, cost-implication narrative, Measure A compliance requirements, and presentation materials.

Interdisciplinary Reviews: Laura and the discipline leads will conduct coordination reviews throughout the project and before each milestone submittal. These reviews will focus on project-specific interfaces, including alignment between community input and conceptual alternatives, consistency of cost implications across phasing scenarios, accuracy of bilingual materials, compliance of outreach documentation with Measure A requirements, and readiness of presentation packages for City Commissions and City Council. Laura will manage these interfaces between meetings so unresolved issues do not carry into the next submittal or public-facing deliverable.

Quality Assurance Audit: Michael will conduct an independent QA audit after technical and interdisciplinary reviews are complete and before each formal submittal. The audit will confirm that required reviews are complete, comments are resolved, drawings and narratives are internally consistent, and the package meets City requirements and Measure A documentation standards.

Deliverables and Document Control: Laura will authorize release of each milestone package only after completion of the QC/QA audit. She will also manage the consolidated comment-resolution and decision log, tracking City, community, and internal comments so that approved direction is consistently reflected across the outreach summaries, concept drawings, cost estimates, and presentation materials.

Corrective Action Measures: We will implement corrective actions to address any incorrect or nonconforming work. Along with our comprehensive QC/QA plan, Kimley-Horn will provide the following for each project deliverable:
◢ Work Plan: Identify key tasks, assign team members, estimate timeframes, appoint QC reviewers, and set the project timeline. ◢ Implement Peer Reviews: Have individuals not directly involved in the tasks perform unbiased technical evaluations ◢ Assign QC/QA Responsibilities: Conduct reviews at the end of each project phase to confirm deliverables are accurate, clear, complete, consistent, and aligned with objectives.
◢ Maintain Detailed Project Documentation: Prepare documents with extensive data and work papers explaining decisions made and the rationale behind recommendation

PLAN DE CONTROL DE CALIDAD
34 1
2 3
4 5
6 KIMLEY-HORN

QUALITY CONTROL IS

SECURED
Through careful surveillance of
work activities by parties not
involved in the initial efforts

ACHIEVED
Through adequate planning,
coordination, supervision and
technical direction

CONTROLLED
By assigning a manager to
evaluate all work flow
and procedures

VERIFIED
Through independent reviews
by qualified staff
Tuesday, October 20, 2026 Reg CC MTG, Page *123
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Kimley-Horn has reviewed the Sample Agreement and would like to discuss the following modifications with the City:

Kimley-Horn has reviewed the sample Professional Services Agreement and requests the following modifications to the indemnification terms to bring the obligation in line with what is allowable under CA Civil Code 2782.8.

15. INDEMNIFICATION.

A. CONTRACTOR shall indemnify, defend with counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature to the extent arising out of or in connection with CONTRACTOR’s negligence, recklessness, or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT, regardless of CITY’S passive negligence, but excepting such loss or damage which is caused by the sole or active negligence or willful misconduct of CITY. Should CITY in its sole discretion find CONTRACTOR’S legal counsel unacceptable, then CONTRACTOR shall reimburse CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation. CONTRACTOR shall promptly pay any final judgment rendered against CITY and its officers, officials, employees and volunteers) covered by this indemnity obligation. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
35 F. ACCEPTANCE OF CONDITIONS
ACEPTACIÓN DE LAS CONDICIONES
Tuesday, October 20, 2026 Reg CC MTG, Page *124
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Kimley-Horn acknowledges receipt of the following addenda issued for the Professional Design Services for the Lomita Sports and Community Center Phase 1 solicitation:
ƒ Notice of Solicitation Update, issued July 28, 2026, clarifying the question submission deadline of August 4, 2026, at 5:00 PM and updating the question-and-answer section in PlanetBids accordingly. ƒ Q and A Set 1, issued August 12, 2026, releasing the first set of questions and answers for this solicitation.

Kimley-Horn has reviewed both addenda and has incorporated all relevant information into this proposal.

G. ADDENDA ACKNOWLEDGEMENT
36 CONFIRMACIÓN DE RECEPCIÓN DE ANEXOS
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Tuesday, October 20, 2026 Reg CC MTG, Page *125
TRCALONG017183.2026 
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Please find the required signed forms beginning on the following page.

H. REQUIRED ATTACHMENTS
37 CARTA INTRODUCTORIA
CITY OF LOMITA • SPORTS AND COMMUNITY CENTER PHASE 1
Tuesday, October 20, 2026 Reg CC MTG, Page *126
Tuesday, October 20, 2026 Reg CC MTG, Page *127
Tuesday, October 20, 2026 Reg CC MTG, Page *128
Tuesday, October 20, 2026 Reg CC MTG, Page *129

ATTACHMENT D

CLAIMS HISTORY
Each Consultant shall submit a summary of whether or not any of the following events have occurred within the past (10) years and, if so, a brief description of the circumstances involved (including, without limitation, the names of parties involved, current status and final disposition of the matter of dispute):

Failure to disclose any circumstances requested in the following paragraphs is grounds for disqualification.
▪ Failure by Consultant or any subconsultant to enter into a contract to which it has received an award by a public entity.
▪ Forfeiture of a bid or proposal bond by proposer or any subconsultant. ▪ Termination for default under a contract awarded by a public entity to Consultant or any subconsultant.
▪ Debarment of Consultant or any subconsultant by any municipal, county, state, federal, or local agency (note: debarment is grounds for automatic disqualification). ▪ The filing of a lawsuit or arbitration in which the Consultant or a subconsultant was a defendant or cross-defendant at any time within the past ten (10) years that involved the performance of project, program, or engineering services and that involved an amount in controversy sought to be recovered from Consultant or the subconsultant of more than $100,000.00.
▪ Conviction of Consultant, a subconsultant, or any of their principals or officers for violation of a state or federal antitrust law involving bid rigging, collusion, or restriction on competition between bidders, or conviction of violating any other federal or state law relating to bidding or contract performance (note: such conviction is grounds for automatic disqualification).

Tuesday, October 20, 2026 Reg CC MTG, Page *130
▪ Any publications involving firm or principals alleging or claiming corruption (such claims are grounds for automatic disqualification).
▪ Any suspension, revocation, or other disciplinary proceeding relating to a contracting or professional license issued to proposer or a subconsultant.

Tuesday, October 20, 2026 Reg CC MTG, Page *131
Kimley-Horn and its subsidiaries have provided services in all fifty states and numerous countries. Because of the many and varied projects we have completed, we are subject to various legal proceedings from time to time and in the ordinary course of business. It is not practical to provide a complete list as part of this proposal. None of the pending matters, if decided against Kimley-Horn, would have a material impact on our financial statements or impair in any way our ability to serve our clients. Generally, these matters are covered by insurance, and we consider them to be without merit. If you would like to discuss our legal matters in more detail, please contact Kimley-Horn’s General Counsel, Ashley Keil, at 919.678.4179.

Litigation cases filed in CA in the last 10 years are as follows:

Air Wing, LLC v. One Piper Ranch, LLC v. Cross-Complainants: San Diego County Superior Court; Case No. 37-2014-00009315; filed 2016; alleged economic loss; Kimley-Horn dismissed; closed 2017 Rickey Fraley, Eileen Fraley v Live Nation Worldwide, Inc., et al: San Bernardino County Superior Court; Case No. CIVDS 1707090; filed 2017; wrongful death claim; Kimley-Horn dismissed; closed 2017.

Nancy Graham v. City of Santa Cruz, et al: Santa Cruz County Superior Court; Case No. 16CV02729; filed 2017; bicycle accident, personal injuries; settled; closed 2018.

Farhad Abad, individually and for the Estate of Mahin Ashki-Abad; Keemia Abad; and Arianna Abad v. U.S.

Foods, Inc., et.al.; Alameda County Superior Court; Case No. RG17856272; filed 2017; traffic accident, wrongful death claim; settled; closed 2019.

Davis S. Lindley, individually and as successor in interest to David W. Lindley, Maureen K. Sennhauser, individually and as successor in the interest to David W. Lindley and The Estate of David W. Lindley v. City of Los Angeles, et al: Los Angeles County Superior Court, Central District; Case No. BC576886; filed 2015; wrongful death claim; settled; closed 2016.

Brenda Sherriffs v. Kimley-Horn and Associates, Inc., et al: Santa Cruz County Superior Court; Case No. 16CV00335; filed 2016; bicycle accident, personal injuries; settled; closed 2019.

Vicente Gomez, et al v. Pilot Travel Centers, LLC, et al; Case # CVRI2103878; Superior Court of California, County of Riverside; filed 2021; personal injuries; settled; closed 2024 Kimberly Lynn Wright and Ty Juan Montanez v City of Concord; et al; Superior Court of California, County of Contra Costa; Case No. MSC20-01067; filed 2020; served 2022; traffic accident, wrongful death claimed; settled; closed 2024
Etzel Williams v Peninsula Corridor Joint Powers Board, City of Burlingame; et al; Superior Court of California, County of San Mateo; Case No. 22-CIV-03763; filed 2024; accident, wrongful death claim; dismissed 2024
Afonso Contreras v Charter Communications Inc., et al; Superior Court of California, County of Los Angeles; Case No. 25AVCV00326; filed in 2025; alleged personal injury resulting from a traffic accident; dismissed; closed 2026
City of San Rafael v Kimley-Horn; Superior Court of California, County of Marin; Case No. CV 00 04619; filed 2024; alleged economic loss; pending
Syimyk Kalkov v. Kimley-Horn and Associates, Inc., et al.; Superior Court of California, County of Contra Costa; Case No. C26-00308; filed 2026; alleged personal injuries claimed; pending Laguna Hills Plaza, LLC vs. Kimley-Horn and Associates, Inc.; Superior Court of California, County of Orange, Case No. 30-2026-0157363A-C U-BC-NJ C; filed 2026; alleged economic loss; pending Tuesday, October 20, 2026 Reg CC MTG, Page *132
California Levine Act Statement
California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits any Lomita City Councilmember from participating in any action related to contracts if he or she receives any political contributions totaling more than $250 within the previous twelve (12) months, and for twelve (12) months following the date a final decision concerning the contract has been made, from the person or company awarded the contract.

The Levine Act also requires disclosure of such contribution by a party to be awarded a specific contract. Proposers are encouraged to review the requirements of the Levine Act at Government Code Section 84308 and any accompanying regulations adopted by the Fair Political Practices Commission (FPPC). Current Lomita City Councilmembers are listed at:
https://lomitacity.com/city-council/
Proposers are responsible for accessing this link to review the names prior to answering the following questions.

1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to any Lomita City Councilmember in the 12 months preceding the date of the submission of your proposal or application? YES If yes, please identify the Councilmember(s):

NO

2. Do you or your company, or any agency on behalf of you or your company, anticipate or plan to make any political contribution of more than $250 to any Lomita City Councilmember in the 12 months before or following any Council action related to your proposal or application?
YES If yes, please identify the Councilmember(s):

NO
Answering yes to either of the two questions above does not preclude the Lomita City Council from awarding a contract or approving an application or any subsequent action. It does, however, preclude the identified Councilmember(s) from participating in any actions related to your proposal or application.

Tuesday, October 20, 2026 Reg CC MTG, Page *133
Date
Signature of authorized individual
Company/Applicant Name
Michael P. Madsen. PLA, CLIA
Vice President
August 18, 2026
Kimley-Horn and Associates, Inc.

Tuesday, October 20, 2026 Reg CC MTG, Page *134
[email protected]
562.549.2186
180 E Ocean Blvd
Suite 1200
Long Beach, CA 90802
Laura Forinash, PE TE
www.kimley-horn.com
Tuesday, October 20, 2026 Reg CC MTG, Page *135
Column1 Column2 Project Support Analyst I Analyst II Analyst III Professional I Professional II Senior Professional I
Senior
Professional II Total Hours Total Cost
Billing Rate $ 172.74 $ 164.06 $ 174.08 $ 188.51 $ 212.82 $ 265.67 $ 327.83 $ 393.28 1 Project Management & Coordination 4 15 34 53.0 $ 15,029.64 1a Project Administation & Invoicing 4 5 10 19.0 $ 5,033.41 1b Kick-Off and Biweekly Progress Meetings (12 meetings) 10 24 34.0 $ 9,996.22 2 Public Engagement & Outreach 0 75 20 51 10 71 227.0 $ 52,573.19 2a Stakeholder Outreach Meetings (2 meetings) 5 6 6 17.0 $ 4,064.25 2b Community Workshops (1 4-hour weekend open house and 2 2-hour workshops) 40 25 25 90.0 $ 20,078.91 2c Pop-Ups (5 events) 30 20 10 60.0 $ 11,835.03
2d Commission Meeting (3), City Council Working Session (1), and City Council Meeting (1) - 5 total meetings 20 40 60.0 $ 16,595.01 3 Existing Conditions & Visioning 10 10 4 4 28.0 $ 6,265.91 3a Site review and recreation needs assessment 5 5 2 2 14.0 $ 3,132.96 3b Opportunities and constraints assessment 5 5 2 2 14.0 $ 3,132.96 4 Concept Alternatives Development 55 65 73 28 14 235.0 $ 50,560.00 4a Concept Site Plan - 3 alternatives 50 60 33 25 12 180.0 $ 38,586.39 4b Preliminary visualizations 30 1 31.0 $ 6,712.45
4c ROM estimate for each concept 5 5 10 2 2 24.0 $ 5,261.16 5 Preferred Concept 90 90 23 33 10 246.0 $ 50,079.32
5a Site Plan 50 50 12 8 120.0 $ 23,987.54
5b Rendering 30 30 8 1 69.0 $ 12,174.78
5c Cost Estimate, Phasing & Implementation Strategy 10 10 15 20 2 57.0 $ 13,917.01 6 Grant Application Preparation 30 50 10 13 103.0 $ 19,929.22 6a Application Forms and Budget Narrative 30 4 34.0 $ 6,717.91 6b Application Narrative 20 5 25.0 $ 5,098.51
6c Cost Estimate Form 5 2 7.0 $ 1,595.44
6d Community Engagement Documentation 30 5 2 37.0 $ 6,517.35 4 260 185 50 172 23 170 28 892.0
$ 42,656.54 690.97 $ 32,205.22 $ 9,425.38 $ 36,605.12 $ 6,110.43 $ 55,731.80 $ 11,011.81 $ 194,437.28 $ Print and Workshop Materials $ 2,500
$ 3,000
$ 199,937.28
Total Hours
City of Lomita
Lomita Sports and Community Center
Phase 1
October 13, 2026
Kimley-Horn and Associates, Inc.

Subtotal Labor
Other Direct Costs
PublicCoordinate

TOTAL COST
Tuesday, October 20, 2026 Reg CC MTG, Page *136
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Deanna Fraley, PE, Public Works Director
MEETING DATE: October 20, 2026
SUBJECT: City Hall 2nd Floor Remodel Update and Second Amendment with Acton Architecture for Architectural Design Services

RECOMMENDED ACTION
Approve Amendment No. 2 to the Agreement with Acton Architecture, Inc. for the City Hall 2nd Floor Remodel Project adding electrical system evaluation and design services in the amount of $59,432, for a revised cumulative total contract amount not to exceed $356,480; and, Authorize staff to proceed with final design and preparation of construction documents.

BACKGROUND
Lomita City Hall is a two-story building constructed in 1973 consisting of approximately 22,000 square feet of office space. The second floor includes approximately 4,500 square feet of office space, along with electrical, utility/equipment rooms and space leased to AT&T. The second-floor office area was not originally designed for its current use and has been modified over time to accommodate approximately 20 City staff and consultants, resulting in an inefficient layout with limited meeting, storage, and collaborative workspace.

On February 17, 2026, the City Council approved a Professional Services Agreement with Acton Architecture, Inc. (Acton) for architectural and engineering design services for the City Hall Second Floor Remodel. Acton was selected through a competitive process in which the City received eight proposals and interviewed four shortlisted firms.

The original project focused primarily on reconfiguring and modernizing the second-floor office area. As design progressed, staff identified an opportunity to coordinate the renovation with the replacement of City Hall’s aging HVAC system. Incorporating the HVAC replacement into the remodel allows the City to coordinate improvements to the

CITY OF LOMITA

CITY COUNCIL REPORT
Item No. 8b
Tuesday, October 20, 2026 Reg CC MTG, Page *137
2 building systems with the architectural work and avoid removing or modifying newly completed improvements at a later date. On July 21, 2026, the City Council approved First Amendment with Acton to incorporate the HVAC replacement into the project for a revised total contract amount not to exceed $291,073.

More recently as the full renovation project progressed, additional evaluation determined that the City Hall’s existing electrical system infrastructure is not adequate for the additional electrical load and requires upgrades to accommodate a renovation of this scale.

Staff is recommending approval of Amendment No. 2 with Acton to evaluate the existing electrical system and incorporate appropriate electrical improvements into the final design for the City Hall 2nd Floor Remodel Project.

DISCUSSION
Design Status and Feedback
Acton and its engineering team have advanced the City Hall Second Floor Remodel (Project) through design development. The major components of the proposed secondfloor layout have been established and the design team has coordinated the architectural improvements with the proposed replacement of the building’s HVAC system.

The Project is intended to provide a more functional and efficient second-floor workspace, improve ADA accessibility and compliance, and better accommodate current and future City operations. Concurrently, the HVAC improvements will replace aging mechanical equipment and controls serving City Hall. With the major project components and optimal floor layout established, City Council authorization is sought to advance the project into final design and preparation of construction documents.

During the next and final phase of design, Acton and its engineering team will complete the architectural and engineering details, coordinate the remodel with the HVAC and electrical improvements, prepare technical specifications, complete plan check, and develop documents necessary to advertise the project for construction.

Authorization to proceed with final design does not authorize construction or award a construction contract. Upon completion of the construction documents, development of the final construction cost estimate, and successful bidding, staff will return to the City Council for consideration of the construction contract and associated project funding.

Electrical System Evaluation and Design
As part of the coordinated design effort, staff is also evaluating electrical improvements that can be efficiently incorporated into the City Hall project. The current electrical infrastructure and capacity at City Hall is outdated and unable to accommodate the proposed improvements. Acton’s proposed Second Amendment is divided into two parts.

Tuesday, October 20, 2026 Reg CC MTG, Page *138
3 Part I – Electrical Evaluation and Due Diligence
Part I will evaluate the existing electrical system and identify alternatives for supporting the proposed EV charging improvements. Potential approaches include upgrading existing building electrical equipment or providing a separately metered electrical service dedicated to the EV chargers.

The Part I scope includes architectural services and cost estimating, civil engineering, and electrical engineering for a total cost of $15,529. Due to timing and coordination efforts, staff utilized existing contingency to cover Part I until an amendment could be approved by City Council.

Part II – Final Electrical Design
Following completion of the evaluation and selection of the preferred electrical strategy, Part II will provide the engineering and architectural services necessary to incorporate the selected improvements into the final construction documents. Depending on the selected approach, improvements could include replacement of existing switchgear or distribution panels, utility coordination and permitting, and installation of underground conduit and related infrastructure.

Because the hardscape east of City Hall is already anticipated to be removed and replaced as part of the accessibility improvements, incorporating underground conduit and related electrical infrastructure into the current project will minimize the need to disturb newly completed improvements in the future. Part II design costs $43,903.

Recommended Next Steps
The Project with new electrical infrastructure design improvements is being coordinated as a single design effort to reduce conflicts between building systems and avoid performing improvements that would subsequently need to be removed or modified in the future. Advancing the components together will allow the City to develop a coordinated set of construction documents and a more comprehensive construction cost estimate before returning to the City Council for consideration of construction.

Staff is seeking the authorization from the City Council to proceed with two actions:

1. Approve Amendment No. 2 with Acton for additional electrical design services; and,

2. Authorize staff to proceed with the Project finals design phase and construction documents. This includes completion of the architectural and engineering details for the floorplan, HVAC and electrical improvements; prepare technical specifications, complete plan check, and develop the Bid Packet document, and finalize a budget for project construction.

Tuesday, October 20, 2026 Reg CC MTG, Page *139
4 FISCAL IMPACT
Amendment No. 2 with Acton requires and additional appropriation of $59,432, bringing the cumulative contract amount to $356,448. The increase will be funded by the City’s Community Development Block Grant ($326,701) and Water Capital Fund ($29,747).

VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS
Approve recommended action.

ATTACHMENTS

1. Second Amendment to Agreement 2026-06 with Exhibit A2 (Consultant’s Proposal)

2. First Amendment to Agreement 2026-06

3. Agreement 2026-06 (Original Agreement)
Reviewed by: Approved by:
_______________________ ______________________
Deanna Fraley, PE Andrew Vialpando
Public Works Director City Manager
Tuesday, October 20, 2026 Reg CC MTG, Page *140
Second Amendment to Agreement No. 2026-06 between
The City of Lomita and Acton Architecture
for Design Services for the City Hall 2nd Floor Remodel Project This Second Amendment to the Agreement is made and entered into between the City of Lomita, a general law city and municipal corporation (“City”) and Acton Architecture, Inc., a California corporation (“Contractor”). The City and Contractor mutually agree to amend the existing Agreement entered into on October 20, 2026 as follows:

RECITALS
A. On February 24, 2026, the City entered into an Agreement with Contractor for Design Services for the City Hall 2nd Floor Remodel Project (“Agreement”) until all authorized work is completed to CITY’s reasonable satisfaction.

B. On July 21, 2026, the First Amendment to the contract for professional services between the City and Contractor was made and entered to increase the total compensation to $264,612, increase the total not-to-exceed amount of to $291,073, and to amend the Scope of Services to include additional work performed.

C. The City and Contractor now desire to enter into this Second Amendment to the Agreement to: (1) increase the total compensation of $264,612 to $324,044 and increase the total not-to exceed amount of $291,073 to $356,448; and (2) to amend the Scope of Services to include additional work performed, as described in Exhibit A2, attached hereto.

NOW THEREFORE, pursuant to Section 30 of the Agreement, and in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows:

1. Subsection C of Section 1, entitled “Consideration and Compensation” is hereby amended to read as follows:

As additional consideration, CITY agrees to pay CONTRACTOR for its services satisfactory and reasonably rendered in an amount of $324,044 for the CONTRACTOR’s estimated costs of its services, computed at a rate pursuant to the rate schedule set forth in the SCOPE OF SERVICES and attached as Exhibit A, unless otherwise specified by written amendment to this Agreement.

The City Council has also approved an additional 10% of these estimated costs, or up to $32,404, for unexpected contingencies, or a total, not-to-exceed amount of $356,448. If CONTRACTOR incurs expenses exceeding its estimated costs of $324,044, the CONTRACTOR must request such expenses in writing, and the CITY’s City Manager or their designee must approve of such requests, for CONTRACTOR to receive compensation for those costs.

2. Exhibits. The CITY and CONTRACTOR agree to add the services and activities set forth in Exhibit A2, entitled “Amendment 02 – Electrical System Upgrades” and attached hereto and hereby incorporated by this reference, to Exhibit A, entitled “Scope of Services,” to the Agreement.

3. NO OTHER CHANGES. All terms, conditions, and other provisions of the Agreement, including all exhibits, not affected by this Second Amendment shall remain in full force and effect.

Tuesday, October 20, 2026 Reg CC MTG, Page *141

4. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The parties agree that this Second Amendment will be considered signed when the signature of a party is delivered by facsimile transmission or scanned and delivered via electronic mail. Such facsimile or electronic mail copies will be treated in all respects as having the same effect as an original signature.

IN WITNESS WHEREOF, the parties hereto have executed this Second Amendment on the 20th day of Ocotber 2026, at Lomita, California.

City of Lomita Acton Architecture
By______________________________ By _______________________________ Andrew Vialpando, City Manager Matt Acton, Principal/Owner Attest: Approved as to Form:
________________________________ _________________________________ Kathleen Horn Gregory, CMC, City Clerk Trevor Rusin, City Attorney Tuesday, October 20, 2026 Reg CC MTG, Page *142
Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton – C-37028
Date: 09/08/2026
Acton Architecture
909-344-2728
[email protected]
1 Amendment 02 – Electrical System Upgrades
Client Name: City of Lomita
Project Name: City Hall 2nd Floor T.I.

Executive Summary
This Amendment is based upon the City requesting a Proposal to provide additional services to assess the existing electrical system to determine necessary upgrades to support up to (4) new Tier 3 EV vehicle chargers. The (2) existing Tier 2 EV chargers are intended to be replaced with (2) Tier 3 EV chargers and a future (2) Tier 3 chargers are desired.

This Proposal is separated into (2) parts with Part I consisting of the due diligence and system evaluation to provide proposed approaches to the electrical improvements and Part II providing full engineering design services as required to complete the selected improvements strategy.

Scope of Work
The Scope of Work for this Amendment is to assess the ability of the building’s existing electrical system to support the (4) EV chargers described above. We anticipate there are likely (2) strategies to support the new chargers: One makes the necessary improvements directly to the existing system and equipment up to and including equipment replacement, the second is to design a separately metered service dedicated to supporting the EV chargers.

If Part II of this Proposal is approved, the final Scope of Work will be dependent upon the final improvement approach selected but potential Scope includes: replacement of the existing building switchgear, replacement of existing distribution panels, and power utility coordination and permitting.

It is anticipated the Scope of Work will include installing underground conduit and infrastructure to support the EV chargers regardless of whether the City approves the Part II design services due to a majority of the existing hardscape to the east of the building being removed/replaced to complete the current site accessibility improvements.

Tuesday, October 20, 2026 Reg CC MTG, Page *143
Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton – C-37028
Date: 09/08/2026
Acton Architecture
909-344-2728
[email protected]
2 Scope of Services
This Proposal includes the additional Services as required to complete the Scope of Work as described above. This will include:
• Architectural Design Services + Cost Estimating
• Civil Engineering
• Electrical Engineering
Fees
The following table outlines the project fees by task to be invoiced monthly as a percentage of completion.

Part I
Task Hours / Rate Fee Total
Civil Engineering $ 2,875
Electrical Engineering $ 6,325
Architectural + Estimating $ 6,329
Part I Fee Total: $15,529
Part II
Task Hours / Rate Fee Total
Electrical Engineering $ 21,850
Civil Engineering $ 3,450
Architectural + Estimating $ 18,603
Part II Fee Total: $43,903
Amendment Fee Total: $59,432

Assumptions and Exclusions
• This Proposal excludes all other consultant and engineering services. If such services are required, additional services can be provided for review/approval. • If electrical 30-day meter readings, additional circuit tracing and/or testing are required, such activities will be provided by the City.

Tuesday, October 20, 2026 Reg CC MTG, Page *144
Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton – C-37028
Date: 09/08/2026
Acton Architecture
909-344-2728
[email protected]
3 • This Proposal is based upon the proposed (4) Tier 3 EV chargers as indicated. If charger quantity, load-management strategy, or installation configuration should change, additional services may be necessary.
• Replacement of existing equipment due to age, condition, code deficiencies, or maintenance requirements not directly associated with the EV Charging Scope is excluded.

Termination
(a) Term. This Agreement shall commence on the Effective Date and shall continue in full force and effect until the earlier of: (i) completion and final delivery of the Services by Architect and final payment by Owner, or (ii) termination as provided herein. (b) Termination for Cause. Either party may terminate this Agreement for cause if the other party materially fails to perform any of its obligations under this Agreement, and does not cure such failure within thirty (30) calendar days after receipt of written notice specifying the nature of the default (or such longer period as the parties may agree in writing). Upon such termination for cause by Owner, Architect shall be entitled to payment for Services properly performed to the date of termination (less any damages incurred by Owner as a result of Architect’s default). Upon such termination for cause by Architect, Owner shall pay for Services properly performed to the date of termination and shall not be liable for further Services.
(c) Termination for Convenience. Owner may terminate this Agreement for its convenience and without cause by giving Architect not less than fifteen (15) calendar days’ prior written notice. Upon receipt of such notice, Architect shall (i) immediately cease all Services (unless otherwise directed in writing by Owner), (ii) prepare and deliver to Owner a statement of Services performed and costs incurred up to the date of termination, and (iii) deliver to Owner all drawings, documents and other work product (whether completed or in progress) for which Owner has paid. Owner shall pay Architect for Services performed up to the effective date of termination, plus reimbursable expenses then incurred, and deduct any amounts for damages or other obligations owed by Architect to Owner. (d) Effect of Termination. Upon termination of this Agreement:
(i) Architect shall place no further orders, procure no further services, and shall cancel to the extent possible all outstanding commitments related to the Services. (ii) Architect shall deliver to Owner all work product, whether complete or incomplete, for which Owner has paid; Architect shall retain a copy for its records. (iii) Owner shall pay Architect in accordance with this clause (and Owner’s obligation to pay for prior Services survives termination).
(iv) Termination shall not relieve either party of obligations under this Agreement which by their nature survive termination (e.g., confidentiality, indemnity, ownership of work product, limitation of liability).

Tuesday, October 20, 2026 Reg CC MTG, Page *145
Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton – C-37028
Date: 09/08/2026
Acton Architecture
909-344-2728
[email protected]
4 (e) No Breach Unless Terminated in Accordance with Clause. If either party terminates in a manner not in accordance with the procedures set out in this Section, such termination may be deemed a breach of this Agreement and subject to remedies accordingly.
(f) California Law and Good Faith. This Agreement shall be interpreted under the laws of the State of California. The parties acknowledge that under California law the implied covenant of good faith and fair dealing is incorporated in this Agreement and that termination rights shall be exercised in good faith and not to deprive either party of the benefit of the bargain.

Signatures
This Proposal is valid for (90) days. Acceptance of this proposal is confirmed by the authorized signatures below.
__________________________
Matt Acton, NCARB - Principal
Acton Architecture

Signed By: __________________________________
Signed By (Printed) : __________________________
Company Name: _____________________________
Date: ______________________________________
Architects are licensed and regulated by the California Architects Board located at 2420 Del Paso Road, Suite 105, Sacramento, CA 95834.

Tuesday, October 20, 2026 Reg CC MTG, Page *146
City of Lomita - 2nd Floor Remodel - Amendment 02
Matt Acton Principal
909-344-2728
Task Staff Hours Rate Markup Total
Civil - Part I VCA - $ 2,500 15% $ 2,875
Electrical Engineering - Part I P2S - $ 5,500 15% $ 6,325 Cost Estimating - Part I HLCM - $ 3,500 15% $ 4,025
Electrical Engineering - Part II P2S - $ 19,000 15% $ 21,850 Civil Engineering - Part II VCA - $ 3,000 15% $ 3,450
Cost Estimating - Part II HLCM - $ 6,500 15% $ 7,475
- $ -
Project Management - Part I Matt Acton 12 $ 192 $ 2,304 Project Management - Part II Matt Acton 16 $ 192 $ 3,072 Matt Acton 10 $ 192 $ 1,920
Anthony Ciavardini 16 $ 72 $ 1,152
Kristine Luong 6 $ 92 $ 552
Technical Specifications - Part II Kristine Luong 4 $ 92 $ 368 Matt Acton 4 $ 192 $ 768
Anthony Ciavardini 4 $ 72 $ 288
Matt Acton 10 $ 192 $ 1,920
Anthony Ciavardini 10 $ 72 $ 720
Kristine Luong 4 $ 92 $ 368
Base Services Fee Subtotal: $ 59,432
Reimbursements: $ -
Base Services Fee Total: $ 59,432
Plan Check - Part II
Fee Estimate
Acton Architecture
Construction Documents - Part II
Construction Administration - Part II
Consultants
Architectural Services
Tuesday, October 20, 2026 Reg CC MTG, Page *147
Docusign Envelope ID 5C378609- 9A19- 88EB-31 D- 8E819BEEA4DB Agree No 2026- 52
First Amendment to Agreement No. 2026- 0 between
The City of Lomita and Acton Architecture
for Design Services for the City HaII 2nd Floor Remodel Project This First Amendment to the Agreement is made and entered into between the City of Lomita, a general law city and municipal corporation (" City"), and Acton Architecture, Inc., a California corporation (" Contractor"). The City and Contractor mutually agree to amend the existing Agreement entered into on February 24, 2026, as follows:

RECITALS
A. On February 24, 2026, the City entered into an Agreement with Contractor for Design Services for the City Hall 2nd Floor Remodel Project (" Agreement") until all authorized work is completed to CITY' sreasonable satisfaction.

B. The City and Contractor now desire to enter into this First Amendment to the Agreement to: (1) increase the total compensation of $ 219, 548 to $ 264, 612 and increase the total not -to -exceed amount of $239, 548 to $ 291, 073; and (2) to amend the Scope of Services to include additional work performed, as described in Exhibit A1, attached hereto.

NOW THEREFORE, pursuant to Section 30 of the Agreement, and in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows:

1. Subsection C of Section 1, entitled " Consideration and Compensation." is hereby amended to read as follows:

As additional consideration, CITY agrees to pay CONTRACTOR for its services satisfactorily and reasonably rendered in an amount not to exceed $ 264, 612 for the CONTRACTOR' sestimated costs of its services, computed at a rate pursuant to the rate schedule set forth in the SCOPE OF SERVICES and attached as Exhibit A, unless otherwise specified by written amendment to this Agreement. The City Council has also approved an additional 10% of these estimated costs, or up to $ 26, 461, for unexpected contingencies, for a total, not -to -exceed amount of $ 291, 073. If CONTRACTOR incurs expenses exceeding its estimated costs of $ 264, 612, the CONTRACTOR must request such expenses in writing, and the CITY' sCity Manager or his designee must approve of such requests for CONTRACTOR to receive compensation for those costs.

2. Exhibits. The CITY and CONTRACTOR agree to add the services and activities set forth in Exhibit A1, entitled " Amendment 01 — Building HVAC System Replacement" and attached hereto and hereby incorporated by this reference, to Exhibit A, entitled " Scope of Services," to the Agreement.

3. NO OTHER CHANGES. All terms, conditions, and other provisions of the Agreement, including all exhibits, not affected by this First Amendment shall remain in full force and effect.

Tuesday, October 20, 2026 Reg CC MTG, Page *148
Docusign Envelope ID 5C378609- 9A19- 88EB-31 D- 8E819BEEA4DB

4. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The parties agree that this First Amendment will be considered signed when the signature of a party is delivered by facsimile transmission or scanned and delivered via electronic mail. Such facsimile or electronic mail copies will be treated in all respects as having the same effect as an original signature.

IN WITNESS WHEREOF, the parties hereto have executed this First Amendment on the 21st day of July 2026, at Lomita, California.

City of Lomita
By Qvul, v, W Ua. raan. h
Acton Architecture
By
Andrew Vialpando, City Manager Matt Acton, Principal/ Owner Attest: Approved as to Form:
i2�l�eev� `1' ovq, ,Qveea, ovti
Kathleen Horn Gregory, CMC, City Clerk
pf Lb
44,
City Attorney
Tuesday, October 20, 2026 Reg CC MTG, Page *149
Docusign Envelope ID: 5C378609- 9A19- 88EB-31D- 8E819BEEA4DB Exhibit Al
Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton - C- 37028
Date: 06/ 26/026
Amendment 01- Building HVAC System Replacement
Client Name: City 4f L4mita
Project Name: Ci' v Ha 2nd F oor T.

Executive Summary
This Amendment is based upon the City requesting a Proposal to provide additional services to design the replacement of the building -wide existing HVAC System. We understand the City previously was in contact with an outside vendor to complete the design and construction of the system replacement and a preliminary Basis of Design Scope of Work was provided to us to serve as a basis of this Proposal.

Scope of Work
The Scope of Work for this Amendment is to complete replacement of the existing air handling unit located inside the 2nd Floor mechanical room, replacement of the existing pneumatic controls with digital controls, and provide new roof -mounted condensing units. The Scope will also include the associated Architectural, Electrical, and Structural engineeringservices to support the system replacement.

It is anticipated the Scope of Work will include additional architectural demolition and replacement of ceilings and/ or finishes outside of the original Scope of Work, Structural strengthening of existing joists to support the new units, roof patching/ repair, and minor electrical system modifications to support the new units.

Scope of Services
This Proposal includes the additional Services as required to complete the Scope of Work as described above. This will include:

Architectural Design Services
Structural Engineering
Mechanical + Electrical Engineering
Acton Architecture
909- 344- 2728
actonma@actonarchitects. com
1 Tuesday, October 20, 2026 Reg CC MTG, Page *150
Docusign Envelope ID: 5C378609- 9A19- 88EB-31D- 8E819BEEA4DB Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton - C- 37028
Date: 06/ 26/026
Fees
The following table outlines the project fees by task to be invoiced monthly as a percentage of completion.

Task
Structural Engineering
M / E Engineering
Architectural Services
Hours / Rate Fee
10, 350
19, 090
15, 624
Total
Fee Total: $ 45, 064
Assumptions and Exclusions
This Proposal excludes all other consultant and engineering services. If such services are required, additional services can be provided for review/ approval.

This Proposal assumes the existing electrical system has the capacity to serve the new HVAC units.

This Proposal assumes the new HVAC unit weights are such that minor strengthening efforts of existing structural elements are able to complete the Scope of Work. If added weight is such that seismic retrofitting of existing primary structural elements or building load paths is required, additional services will be required to incorporate additional Structural Engineering services.

Testing and Balancing of the existing HVAC system is excluded from this Proposal. It is assumed such testing is not required due to the replacement of the entire system.

Commissioning services are excluded from this Proposal as such services are not code - required for the Scope of Work. If such services are requested by the City, they can be provided under Additional Services.

Termination
a) Term. This Agreement shall commence on the Effective Date and shall continue in full force and effect until the earlier of: (i) completion and final delivery of the Services by Architect and final payment by Owner, or ( ii) termination as provided herein. b) Termination for Cause. Either party may terminate this Agreement for cause if the other party materially fails to perform any of its obligations under this Agreement, and does not cure such failure within thirty ( 30) calendar days after receipt of written notice specifying the nature of the default (or such longer period as the parties may agree in writing). Upon such termination for cause by Owner, Acton Architecture
909- 344- 2728
actonma@actonarchitects. com
2 Tuesday, October 20, 2026 Reg CC MTG, Page *151
Docusign Envelope ID: 5C378609- 9A19- 88EB-31D- 8E819BEEA4DB Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton - C- 37028
Date: 06/ 26/026
Architect shall be entitled to payment for Services properly performed to the date of termination ( less any damages incurred by Owner as a result of Architect' s default). Upon such termination for cause by Architect, Owner shall pay for Services properly performed to the date of termination and shall not be liable for further Services.
c) Termination for Convenience. Owner may terminate this Agreement for its convenience and without cause by giving Architect not less than fifteen ( 15) calendar days' prior written notice. Upon receipt of such notice, Architect shall ( i) immediately cease all Services ( unless otherwise directed in writing by Owner), (ii) prepare and deliver to Owner a statement of Services performed and costs incurred up to the date of termination, and ( i i i ) deliver to Owner all drawings, documents and other work product whether completed or in progress) for which Owner has paid. Owner shall pay Architect for Services performed up to the effective date of termination, plus reimbursable expenses then incurred, and deduct any amounts for damages or other obligations owed by Architect to Owner. d) Effect of Termination. Upon termination of this Agreement:
i) Architect shall place no further orders, procure no further services, and shall cancel to the extent possible all outstanding commitments related to the Services. ii) Architect shall deliver to Owner all work product, whether complete or incomplete, for which Owner has paid; Architect shall retain a copy for its records. iii) Owner shall pay Architect in accordance with this clause ( and Owner' s obligation to pay for prior
Services survives termination).
iv) Termination shall not relieve either party of obligations under this Agreement which by their nature survive termination ( e.g., confidentiality, indemnity, ownership of work product, limitation of liability).
e) No Breach Unless Terminated in Accordance with Clause. If either party terminates in a manner not in accordance with the procedures set out in this Section, such termination may be deemed a breach of this Agreement and subject to remedies accordingly.
f) California Law and Good Faith. This Agreement shall be interpreted under the laws of the State of California. The parties acknowledge that under California law the implied covenant of good faith and fair dealing is incorporated in this Agreement and that termination rights shall be exercised in good faith and not to deprive either party of the benefit of the bargain.

Acton Architecture
909- 344- 2728
actonma@actonarchitects. com
3 Tuesday, October 20, 2026 Reg CC MTG, Page *152
Docusign Envelope ID: 5C378609- 9A19- 88EB-31D- 8E819BEEA4DB Acton Architecture Inc
2519 3RD Street, La Verne, CA 91750
Matt Acton - C- 37028
Date: 06/ 26/026
Signatures
This Proposal is valid for ( 90) days. Acceptance of this proposal is confirmed by the authorized signatures below.

Matt Acton, NCARB - Principal
Acton Architecture
Signed By:

Signed By ( Printed) :

Company Name:

Date:

Architects are licensed and regulated by the California Architects Board located at 2420 Del Paso Road, Suite 105, Sacramento, CA 95834.

Acton Architecture
909- 344- 2728
actonma@actonarchitects. com
4 Tuesday, October 20, 2026 Reg CC MTG, Page *153
Docusign Envelope ID: 5C378609- 9A19- 88EB-31D- 8E819BEEA4DB Fee Estimate
Acton Architecture
City of Lomita • 2nd Floor Remodel - Amendment 01
Matt Acton
909- 344- 2728
Principal
Consultants
Structural W* R
9, 000 15% 10, 350
M / E Engineering P2S 16, 600 15% 19, 090
Architectural Services
Scope Assessment + Due Diligence Matt Acton 8 192 1, 536 Project Management Matt Acton 16 792 3, 072
Construction Documents
Matt Acton 20 192 3. 840
Anthony Ciavardini 20 72 1, 440
Kristine Luong 6 92 552
Technical Specifications
Matt Acton 2 192 384
Kristine Luong 8 92 736
Plan Check
Matt Acton 4 192 768
Anthony Ciavardini 4 72 288
Construction Administration
Matt Acton 10 192 1, 920
Anthony Ciavardini 10 72 720
Kristine Luong 4 92 368
Base Services Fee Subtotal:

Reimbursements:
45, 064
Base Services Fee Total: $ 45, 064
Tuesday, October 20, 2026 Reg CC MTG, Page *154
Tuesday, October 20, 2026 Reg CC MTG, Page *155
Tuesday, October 20, 2026 Reg CC MTG, Page *156
Tuesday, October 20, 2026 Reg CC MTG, Page *157
Tuesday, October 20, 2026 Reg CC MTG, Page *158
Tuesday, October 20, 2026 Reg CC MTG, Page *159
Tuesday, October 20, 2026 Reg CC MTG, Page *160
Tuesday, October 20, 2026 Reg CC MTG, Page *161
Tuesday, October 20, 2026 Reg CC MTG, Page *162
Tuesday, October 20, 2026 Reg CC MTG, Page *163
Tuesday, October 20, 2026 Reg CC MTG, Page *164
Tuesday, October 20, 2026 Reg CC MTG, Page *165
Tuesday, October 20, 2026 Reg CC MTG, Page *166
Tuesday, October 20, 2026 Reg CC MTG, Page *167
Tuesday, October 20, 2026 Reg CC MTG, Page *168
Tuesday, October 20, 2026 Reg CC MTG, Page *169
Tuesday, October 20, 2026 Reg CC MTG, Page *170
Tuesday, October 20, 2026 Reg CC MTG, Page *171
Tuesday, October 20, 2026 Reg CC MTG, Page *172
Tuesday, October 20, 2026 Reg CC MTG, Page *173
Tuesday, October 20, 2026 Reg CC MTG, Page *174
Tuesday, October 20, 2026 Reg CC MTG, Page *175
Tuesday, October 20, 2026 Reg CC MTG, Page *176
Tuesday, October 20, 2026 Reg CC MTG, Page *177
Tuesday, October 20, 2026 Reg CC MTG, Page *178
Tuesday, October 20, 2026 Reg CC MTG, Page *179
Tuesday, October 20, 2026 Reg CC MTG, Page *180
Tuesday, October 20, 2026 Reg CC MTG, Page *181
Tuesday, October 20, 2026 Reg CC MTG, Page *182
Tuesday, October 20, 2026 Reg CC MTG, Page *183
Tuesday, October 20, 2026 Reg CC MTG, Page *184
Tuesday, October 20, 2026 Reg CC MTG, Page *185
Tuesday, October 20, 2026 Reg CC MTG, Page *186
Tuesday, October 20, 2026 Reg CC MTG, Page *187
Tuesday, October 20, 2026 Reg CC MTG, Page *188
Tuesday, October 20, 2026 Reg CC MTG, Page *189
Tuesday, October 20, 2026 Reg CC MTG, Page *190
Tuesday, October 20, 2026 Reg CC MTG, Page *191
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Deanna Fraley, PE, Public Works Director
MEETING DATE: October 20, 2026
SUBJECT: First Amendment to Agreement No. 2026-54 with Local Agency Engineering Associates, Inc. for On-Call Construction Management and Construction Inspection Services and Task Order Approval

RECOMMENDED ACTION
Approve the First Amendment to Agreement No. 2026-54 with Local Agency Engineering Associates, Inc. (LAE) for On-Call Construction Management and Construction Inspection Services (CMCI) authorizing a one-time exceedance to the $200,000 individual task order limit for Task Order No. 1 and Task Order No. 2 associated with the Zone G projects, plus a contingency of 15% for unexpected work, for a total contract amount not to exceed $569,825.30; approve Task Order 1 for the Zone G Water Main Replacement Project; approve Task Order 2 for the Street Reconstruction Project – Zone G Phases 3 and 4; and, authorize the City Manager to execute the First Amendment and associated task orders.

BACKGROUND
In May 2026, the City published a request for proposals (RFP) for on-call construction management and construction inspection (CMCI) services to support the City’s Capital Improvement Program (CIP). The requested services included construction management, inspection, contract administration, schedule and budget management, materials testing coordination, labor compliance monitoring, and project closeout.

On August 18, 2026, City Council approved professional services agreements with four qualified firms, including Local Agency Engineers Associates, Inc. (LAE), to provide oncall CMCI services. Agreement No. 2026-54 with LAE established an overall agreement limit of $500,000 and individual task order limit of $200,000.

The adopted FY 26-27 Budget includes a series of large Capital Improvement Projects that will require CMCI services.

CITY OF LOMITA

CITY COUNCIL REPORT
Item No. 8c
Tuesday, October 20, 2026 Reg CC MTG, Page *192
2 DISCUSSION
Zone G Water Main Replacement Project
The Zone G Water Main Replacement project will replace aging water mains along Walnut Street, Ebony Lane, and 247th Place (Attachment 1). The existing water mains range from 4 inches to 8 inches in diameter and were originally constructed in 1928, exceeding their anticipated useful life. The project includes installation of approximately 4,500 linear feet of new 8-inch ductile iron water main, abandonment of existing water mains, and installation of associated infrastructure, including valves, service laterals, fittings, and fire hydrants. The improvements will enhance the reliability and resiliency of the City’s water distribution system and improve fire flow within the project area.

The project was identified in the City’s 2022-2027 CIP Master Plan and design plans for the project has been approved.

Street Reconstruction Project – Zone G Phases 3 & 4
The Street Reconstruction Project – Zone G is a multi-phase capital improvement project to rehabilitate deteriorated streets and associated infrastructure within the Zone G project area. Construction of Phase 1 was completed in October 2025, and Phase 2 was completed in May 2026.

Phases 3 and 4 include roadway rehabilitation along Walnut Street, Ebony Lane, Alcor Street, 252nd Street, 247th Place, 254th Street, 255th Street, and Doria Avenue (Attachment 2). Improvements will range from asphalt grind and overlay to full-depth street reconstruction, depending on existing pavement conditions. The project also includes ADA-compliant curb ramps, curb extensions, a new fire hydrant on Alcor Street, and traffic safety improvements identified through the City’s 2025 Citywide School Loading Zone Study and Local Travel Network Project.

Design plans have also been approved for this project.

CMCI Services Required for Both Projects
Both Zone G Water and Zone G Streets Phases 3 and 4 projects include improvements along Walnut Street, Ebony Lane, and 247th Place, requiring coordination of construction schedules and activities. The water main replacement work must be completed before roadway rehabilitation along the affected streets to avoid excavating newly reconstructed pavement. Utilizing the same CMCI consultant for both projects will provide continuity in construction oversight, improve coordination between contractors, and minimize potential conflicts and delays.

Staff reviewed the City’s prequalified on-call CMCI consultants based on project experience, technical expertise, staffing availability, and anticipated workload. Staff Tuesday, October 20, 2026 Reg CC MTG, Page *193
3 recommends LAE for both assignments based on their familiarity with the City’s infrastructure and successful performance by providing similar services.

LAE will provide construction management, inspection, contract administration, schedule and cost monitoring, review of contractor submittals and change orders, coordination of materials testing, construction documentation, labor compliance, and project closeout services for both projects.

One-time Authorization to Exceed Task Order Limit with LAE Associates The existing agreement with LAE establishes a maximum individual task order amount of $200,000 with a cumulative agreement limit of $500,000. However, the anticipated construction durations and level of inspection and construction management required for the two Zone G projects result in proposed task order amounts that exceed the existing individual task order limit of $200,000.

Staff recommends a one-time authorization to exceed the $200,000 task order limit, applicable only to Task Order No. 1 for the Zone G Water Main Replacement Project and Task Order No. 2 for the Street Reconstruction Project – Zone G Phases 3 and 4. Staff also recommends establishing up to a 15% contingency for each of these task orders to address unforeseen construction conditions, extended construction durations, or additional inspection and construction management services that may be necessary during project delivery. Use of contingency funds would be subject to City authorization.

Approval of the First Amendment would increase the overall agreement limit from $500,000 to $569,825.30.

Moving forward, other future water and street projects, including future task orders with LAE, will be bound to the $200,000 individual task order limit established by City Council authority.

Required Task Orders
Task Order No. 1 will provide CMCI services for the Zone G Water Main Replacement Project, and Task Order No. 2 will provide CMCI services for the Street Reconstruction Project – Zone G Phases 3 & 4.

The Notice Inviting Bids (NIB) for the Zone G Water Main Replacement Project was published on September 17, 2026. Advertisement of the Street Reconstruction Project – Zone G Phases 3 & 4 is anticipated within the next month.

Approving the task orders before award of the construction contracts will allow LAE to review the construction documents, coordinate with the design consultants, and prepare for construction administration. Early involvement will support a more efficient transition from bidding to construction and help ensure that the water main and street reconstruction projects are appropriately sequenced. Staff recommends approval of the First Tuesday, October 20, 2026 Reg CC MTG, Page *194
4 Amendment and both task orders to facilitate coordinated construction management and inspection services for these projects.

The City will continue to utilize its other prequalified on-call CMCI consultants for future projects based on project-specific qualifications, availability, workload, and the City’s operational needs. The proposed one-time exception is recommended because of the unique coordination requirements between these two overlapping Zone G projects and is not intended to modify the City’s overall approach to assigning work under the on-call agreements.

FISCAL IMPACT
The First Amendment to Agreement No. 2026-54 would increase the overall agreement limit from $500,000 to $569,825.30, an increase of $69,825.30.

This amount includes two task orders. Task Order No. 1 applies to the Zone G Water Main Replacement Project and is for an amount of $270,794.56 plus a 15% contingency for unexpected costs in an amount of $40,619.18, for a total amount not to exceed $311,413.74. Task Order No. 2 for the Street Reconstruction Project - Zone G Phases 3 & 4 is for an amount of $224,705.70 plus a 15% contingency for unexpected costs in an amount of $33,705.86, for a total amount not to exceed $258,411.56.

Funding for these projects, which include the CMCI work discussed, has already been appropriated in the FY 2026-27 Adopted Budget. The funding sources are identified in the table below:

TASK ORDER FUND AMOUNT
Task Order 1: Zone G
Water Main Replacement Water Capital Fund (Fund 520) $ 311,413.74 Task Order 2: Street
Reconstruction Gas Tax
(Fund 205) $ 95,612.28
Measure R
(Fund 207) $ 38,761.73
Measure M
(Fund 209) $ 28,425.27
Street Improvement (Fund 311) $ 95,612.28
TOTAL $ 569,825.30
Tuesday, October 20, 2026 Reg CC MTG, Page *195
5 VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 5: City Infrastructure & Water Utility – Investing in reliable, sustainable infrastructure.

OPTIONS

1. Approve recommended action.

2. Provide Staff with further direction.

ATTACHMENTS

1. Zone G Water Main Replacement Project Map

2. Street Reconstruction Project – Zone G Phases 3 & 4 Map

3. First Amendment to Agreement No. 2026-54 with Exhibits A.1, A.2, B.1, and B.2 Exhibits A.1 & B.1 - Task Order No.1 - Zone G Water Main Replacement Project Exhibits A.2 & B.2 - Task Order No. 2 - Street Reconstruction Project – Zone G Phases 3 & 4

4. Original Agreement No. 2026-54
Prepared by: Approved by:
_______________________ ______________________
Deanna Fraley, PE Andrew Vialpando
Public Works Director City Manager
Tuesday, October 20, 2026 Reg CC MTG, Page *196
Attachment 1
Zone G Water Main Replacement Project Map
Tuesday, October 20, 2026 Reg CC MTG, Page *197
Attachment 2
Street Reconstruction Project - Zone G Phases 3 & 4 Map Tuesday, October 20, 2026 Reg CC MTG, Page *198
1 65265.00001\45524175.3

FIRST AMENDMENT TO

AGREEMENT BETWEEN THE CITY OF LOMITA AND
LOCAL AGENCY ENGINEERING ASSOCIATES, INC.

This First Amendment to the Agreement between the City of Lomita, a general law city and municipal corporation (“City”) and Local Agency Engineering Associates, Inc., a California corporation, dba LAE Associates, Inc. (“Contractor”) is made and entered into this 20th day of October 2026.

A. The City and Contractor are parties to an Agreement for On-Call Construction Management and Inspection Services dated 18th day of August 2026 (“the Agreement”).

B. The City and Contractor desire to amend the Agreement to (1) increase the total not-to-exceed amount of the Agreement by $69,825.30; (2) authorize a one-time exception to the Agreement’s task order limits solely for the Zone G Water and Zone G Streets projects; (3) amend the Scope of Services to include Exhibits A.1 and A.2; and (3) revise fee schedules for the specific Scope of Services included in Exhibits B.1 and B.2.

NOW, THEREFORE, in consideration of the promises and mutual covenants contained therein, City and Contractor hereby agree as follows:

1. CONSIDERATION AND COMPENSATION. Section 1, entitled
“Consideration and Compensation.” Subsection C is amended to read as follows:

As additional consideration, CITY agrees to pay CONTRACTOR for its services satisfactory and reasonably rendered in an amount not to exceed $569,825.30, computed at a rate pursuant to the rate schedules attached as Exhibits B, B.1, and B.2, unless otherwise specified by written amendment to this Agreement. Except as expressly provided below, compensation shall not exceed $200,000 per task order. Beginning on June 30, 2027, and annually thereafter, the rates are subject to adjustment by the percentage change in the March Edition of the Consumer Price Index, as published by the United States Bureau of Labor Statistics, up to an increase of 3%. In the event of an escalation of rates pursuant to this section, CONTRACTOR shall notify City in writing of the rate increase. Any rate adjustment remains subject to the applicable task order limit and the Agreement’s total not-toexceed amount.

The City may issue separate task orders to Contractor for construction management and inspection services for the Zone G Water Main Replacement Project – Project No. W-375 and the Zone G Street Reconstruction Project (Phases 3 & 4) subject to the following project specific limits: the Zone G Water Main Replacement Project – Project No. W-375 task order shall not exceed $270,794.56, with an additional 15% of the task order’s approved costs, or up to $40,619.18, for a total, not-to-exceed amount of $311,413.74; the Zone G Street Attachment 3 Tuesday, October 20, 2026 Reg CC MTG, Page *199 2 65265.00001\45524175.3
Reconstruction Project (Phases 3 & 4) task order shall not exceed $224,705.70, with an additional 15% of the task order’s approved costs, or up to $33,705.86, for a total, not-to-exceed amount of $258,411.56. The increased not-to-exceed amounts for both Zone G task orders shall not apply to any other task order. If CONTRACTOR incurs expenses exceeding the approved costs of a task order, excluding any approved contingency allowance, the CONTRACTOR must request such expenses covered by the contingency allowance in writing, and the CITY’s City Manager or his designee must approve of such requests, for CONTRACTOR to receive compensation for those costs.

2. EXHIBITS. In addition to the work plan as outlined in the Agreement, Contractor will provide the SCOPE OF SERVICES as set forth in Exhibits A.1 and A.2.

Certain fees relating to the services being provided are amended as set forth in Exhibits B.1 and B.2. Exhibits A.1, A.2, B.1, and B.2 attached hereto are incorporated herein by reference.

3. NO OTHER CHANGES. All terms, conditions and other provisions of the Agreement, including all Exhibits thereto, shall remain in full force and effect.

4. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this amendment to the Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.

IN WITNESS WHEREOF, the parties hereto have executed this First Amendment on the 20th day of October 2026, at Lomita, California.

CITY OF LOMITA CONTRACTOR

Andrew Vialpando, City Manager By: Fred Alamolhoda, P.E., QSD/QSP, Municipal Engineering Director

By: Kevin Alamolhoda, P.E., Principal
ATTEST:
562646121
Kathleen Horn Gregory, City Clerk Taxpayer ID No.

Tuesday, October 20, 2026 Reg CC MTG, Page *200
3 65265.00001\45524175.3
APPROVED AS TO FORM:

Trevor Rusin, City Attorney
Tuesday, October 20, 2026 Reg CC MTG, Page *201
LAE Associates, Inc.

Project, Construction & Program Management
Proposal for
Construction Management, Construction Inspection, Labor Compliance, and Material Testing services for

ZONE G WATER MAIN REPLACEMENT PROJECT
Project No. W-375
Date: September 9, 2026
Prepared for

CITY OF LOMITA
Contact Information
1050 E. Yorba Linda Blvd., Unit 201
Placentia, CA 92870
Tel: 714.993.2840
LAEassociates.com
Exhibit A.1
Tuesday, October 20, 2026 Reg CC MTG, Page *202
Zone G Water Main Replacement Project i
City of Lomita

TABLE OF CONTENTS
COVER LETTER .................................................................................................................................................................... 1 FIRM’S OVERVIEW ................................................................................................................................................................ 2 Qualifications ....................................................................................................................................................................... 2 QUALIFICATION AND EXPERIENCE ................................................................................................................................... 3 Key Personnel ..................................................................................................................................................................... 3 Organization Chart .............................................................................................................................................................. 3 Staff Qualifications and Experience .................................................................................................................................... 3 Resumes ............................................................................................................................................................................. 9 Team’s Availability ............................................................................................................................................................... 9 Firm Experience ................................................................................................................................................................ 10 SCOPE OF WORK AND PROJECT APPROACH ............................................................................................................... 12 Understanding the Need ................................................................................................................................................... 12 Scope of Work and Project Approach ............................................................................................................................... 15 FEE PROPOSAL .................................................................................................................................................................. 22 Tuesday, October 20, 2026 Reg CC MTG, Page *203
Page | 1
q

COVER LETTER
Tuesday, October 20, 2026 Reg CC MTG, Page *204
1050 E. Yorba Linda Blvd., Unit 201, Placentia, CA 92870 (714) 993-2840
LAEassociates.com1
Page | 1
Associates, Inc.

COVER LETTER
September 9, 2026
Ms. Deanna Fraley, P.E.

Public Works Director
Public Works Department
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
Attention: Jennifer Howell, P.E., Associate Engineer
SUBJECT: PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION, LABOR COMPLIANCE, AND MATERIAL TESTING SERVICES FOR ZONE G WATER MAIN REPLACEMENT PROJECT – PROJECT NO. W-375
Dear Ms. Fraley,
Local Agency Engineering Associates, Inc., doing business as (DBA) LAE Associates, Inc. (LAE) is pleased to have the opportunity to submit our proposal to the City of Lomita (City) to provide Construction Management, Construction Inspection, Labor Compliance and Material Testing Services. Our services will be for the following project:
 Zone G Water Main Replacement Project – Project No. W-375 Our firm specializes in Construction Management, Project and Program Management, Construction Inspection, and Other Municipal Services for public agencies. We have served as an on-call consultant to the City for the past eight (8) years, since 2018, delivering multiple successful projects across various disciplines.

The assembled team designated to provide the requested services offers extensive experience working with public agencies on water main replacement, pipeline installation, utility coordination, testing, and related municipal infrastructure projects. LAE will assign Mr. Kevin Alamolhoda, P.E., Construction Manager [over ten (10) years of Public Works Engineering experience with LAE] as the Construction Manager along with support staff. LAE will assign one of the following Construction Observers/Inspectors as the prime Construction Observer/inspector and the others as alternate/back-up Construction Observers/ Inspectors: Ned Shaffer, Marco Zamora, and Jesse Di Stefano [each has over twenty (20) years of construction experience]. These key members have the required CM&I experience needed to manage and observe the subject project. Our sub-consultants will include GCAP Services, Inc. for Labor Compliance Services, Geo-Advantec, Inc. for Geotechnical and Material Testing Services, and Onward Engineering (OE) for Design Support Services
Thank you for providing LAE with an avenue to be of service to the City. I, Fred Alamolhoda, Municipal Engineering Director of LAE, am authorized to sign contracts for LAE. The information submitted in this proposal is true and correct to the best of my knowledge. Please feel free to contact me regarding this proposal at 714- 993-2840 or [email protected].

Sincerely,
Fred Alamolhoda, P.E.

Municipal Engineering Director
Tuesday, October 20, 2026 Reg CC MTG, Page *205
Page | 1
FIRM’S OVERVIEW
Tuesday, October 20, 2026 Reg CC MTG, Page *206
Zone G Water Main Replacement Project Page | 2
City of Lomita
FIRM’S OVERVIEW
LAE Associates, Inc. (LAE) is an S-Corporation that provides professional public works and engineering services to public agencies across Southern California, with the main objective of improving the communities we live in and ensuring the satisfaction of our clients. In 2007, LAE, was founded on the premise of enhancing the processes, outcomes, and nature of municipal projects. LAE has one primary mid-sized office at 1050 E. Yorba Linda Blvd., Unit 201, Placentia, CA 92870 and twenty (20) employees.

Key Services
LAE specializes in Project, Construction, and
Program Management services for public
agencies. In addition, LAE’s services include
Construction Observation and Inspection, Water
District and City Services, Staff Augmentation/
Mentorship, Capital Project Planning, and
Transportation Funding Strategies to individual
Cities, Counties, Councils of Governments, and
other Public Agencies.

Qualifications
LAE has a demonstrated history of providing
Project/Program/Construction Management, Staff Augmentation, Project Planning, and Inspection to Cities, Water Districts, and other Public Agencies. Additionally, LAE has provided Geo-technical and Labor Compliance Services through its subconsultants. LAE teams have been working very closely with Cities, Counties, Caltrans, Water Districts, SBCTA, CVAG, and other public agencies. We are the on-call consultant for several agencies, assisting them in times of urgency as well as year-round on a variety of Public Works projects. We have served as an on-call consultant to the City of Lomita for the past eight (8) years, since 2018, delivering multiple successful projects across various disciplines. LAE’s extensive experience includes successfully delivering projects and/or being on-call for various cities and municipalities, including:
 City of Anaheim
 City of Arcadia
 City of Azusa
 City of Cerritos
 City of Chino
 City of Claremont
 City of Compton
 City of Diamond Bar
 City of Rosemead
 City of Eastvale
 City of El Monte
 City of Fontana
 City of La Mirada
 City of Laguna
Beach
 City of Lawndale
 City of Lomita
 City of Manhattan Beach
 City of Montclair
 City of Norwalk
 City of Pomona
 City of Rancho
Cucamonga
 City of San Bernardino
 City of San Dimas
 City of Seal Beach
 City of Tustin
 City of Ventura
 City of Yorba
Linda
 EVMWD
 Western Water
Having familiarity with the area allows us to provide our services in a time-effective and efficient manner with high caliber outcomes. LAE’s employees bring extensive public- and private-sector experience and understand the complexities associated with the services and requirements of this task order. The management of the firm has approximately forty (40) years of Public Works experience, having been employed with several cities and Caltrans on relevant practices. The LAE team have been successful in their efforts due to their high quality and timely project delivery, experienced staff, loyal clients, and reputable project partners. LAE consists of a diverse group of experienced professionals who provide exceptional services to its clients. We are committed to delivering quality work, and our success is reflected in the long-term relationships we have built with our clients. Our team is comprised of talented individuals who are based in various locations, allowing us to serve clients across different geographic areas. We have a team of professionals who are local and experienced in the specific needs of this community. Our staff is flexible and able to travel to project or City locations. Proposed staff will be responsible for executing professional proposed services from either the LAE office or one of the City’s offices, ensuring we provide the best possible service to our clients.

We are familiar with the entire project development process, from conception to construction completion, and know how to obtain desirable results for the City. We have been able to streamline this process for our clients with a series of established methods and rapport developed with participating agencies. With the use of schedules, we can track the progress of projects and actively manage potential upcoming conflicts. Staffing needs will also be projected with the use of such systems. Critical tasks and milestones will clearly be identified, with dates shown to visualize when submittals need to be received, construction activities are to be completed, and meetings are to be conducted. Further details of our key issue management approach are discussed in this Proposal.

Tuesday, October 20, 2026 Reg CC MTG, Page *207
Q

QUALIFICATION AND EXPERIENCE
Tuesday, October 20, 2026 Reg CC MTG, Page *208
Zone G Water Main Replacement Project Page | 3
City of Lomita

QUALIFICATION AND EXPERIENCE
Key Personnel
The LAE team is a group of highly experienced personnel who have in-depth knowledge of Engineering and CIP projects, from conception to completion. Our proposed teams possess practical, relevant, and quality experience on projects with nearly the same Scope of Services. We are equipped to bring our familiarity and know-how to the City and be of contribution to the project.

Organization Chart
Staff Qualifications and Experience
Project/Construction Managers
Mr. Alamolhoda has over ten (10) years of professional experience working for LAE Associates, Inc. and the Los Angeles County Department of Public Works. He has worked closely with Project/Program Managers, Construction Managers, and Construction Observers on a variety of Public Works Engineering Projects. He interacts regularly with client cities, public Kevin Alamolhoda, P.E.

Senior Construction/Contract
Manager, LAE
Education
 MBA
 B.S. in Civil Engineering
Years of Experience
12 years
Years with LAE
10 years
License No.
92855
Tuesday, October 20, 2026 Reg CC MTG, Page *209
Zone G Water Main Replacement Project Page | 4
City of Lomita
agencies, consultants, and contractors, and has provided both in-person and virtual PM/CM staff augmentation for multiple client cities. His experience includes multiple transportation and underground utility projects.

Experience
Underground Projects
 Quadrant 1,2,3 (Phase 1 and Phase 2) Water Main Replacement (On-Call CM/PM) – City of Chino  Sewer Re-Lining (On-Call CM/PM) – City of Chino
 Santa Ana Place, Victoria Avenue, Ramona Avenue Water Main Replacement Project – City of Chino  Pipeline Storm Drain Replacement Project (On-Call CM/PM) – City of Chino  Central Avenue Water Main Replacement Project (On-Call CM/PM) – City of Chino  Washington Avenue, Lincoln Avenue, Monte Vista Avenue and Telephone Avenue Water Main Replacements (OnCall CM/PM) – City of Chino  Well 11 Raw Water Transmission Main (On-Call CM/PM) – City of Chino  Yorba Avenue and Eucalyptus Avenue Sewer Main Replacement Project (On-Call CM/PM) – City of Chino  3 Bridges Benson Avenue Permanent Pump Station (On-Call CM/PM) – City of Chino  247th Street Area Water Main Replacement Project – City of Lomita  Rancho Cucamonga Sports Center Sewer Line Replacement Project – City of Rancho Cucamonga  Water Main Replacement Project on Westerly Dr., New Ridge Dr., Bay Ridge Dr., Riverside Ave., and Dallas Ave. - Western Municipal Water District
 Orangecrest Water Main Replacement Project at Gustin Road, Gila Way, Colt Street, and Woodlake Drive – Western Municipal Water District
 Lake Matthews Water Main Replacement Project at Barton Street, Rancho Verde Circle, Rancho Viejo Drive, Saddle Crest Place, and Rawhide Lane – Western Municipal Water District Aboveground Projects
 Removal and Replacement of Southern California Edison (SCE) owned Street Lights Poles/Fixtures – City of Arcadia  Traffic Signal Modification Ramona Avenue and Schaefer Avenue Project – City of Chino  Edison Avenue Traffic Signal Upgrade Project – City of Chino  Arrow Highway Transit Improvements, First Street Pavement Rehabilitation, and Indian Hill Boulevard I-10 Street Improvements Project – City of Claremont
 Claremont Boulevard and Monte Vista Avenue Accessibility Project – City of Claremont  City Wide Street Resurfacing Project – City of Claremont  College Avenue Pedestrian and Bike Improvements Project – City of Claremont  Central Avenue Pavement Rehabilitation Project – City of Compton  Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement Project – City of Compton  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Parking Lot and Street Improvements – Elsinore Valley Municipal Water District  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Street Reconstruction Zone G – Phase 1 Project – City of Lomita  Manhattan Beach Boulevard Eastbound Left-Turn Improvements at Aviation Boulevard Project – City of Manhattan Beach
 Fiscal Year 25 – 26 Local Slurry Seal Pavement Rehabilitation – City of Rancho Cucamonga  Fiscal Year 25 – 26 Annual Pavement Preservation Project (APPP) – Zone 7B – City of Yorba Linda Construction Observers/Inspectors
Mr. Shaffer has over forty (40) years of experience in the construction industry, including thirty-six (36) years with Golden State Water Company (GSWC). He has provided inspection services for roadway rehabilitation, reconstruction, slurry seal improvements, public facility, and concrete improvement construction projects for various Southern California cities, supporting quality control, compliance, and successful project delivery. He was responsible for inspecting, monitoring, Years of Experience
40 years
Years with LAE
5 years
Ned Shaffer
Construction
Observer/Inspector, LAE
Training Courses
 Safety Training, OSHA (trenches
safety), Water Pressure Check,
Inspection, Fire Safety, Asbestos
Abatement Training
Key Skills
Construction Inspection
& Utility Coordination
Years of Experience
40 years
Years with LAE
4 years
Tuesday, October 20, 2026 Reg CC MTG, Page *210
Zone G Water Main Replacement Project Page | 5
City of Lomita
installing, maintaining, and repairing water system infrastructure for GSWC and its member agencies. His experience includes construction inspection, utility coordination, water main installation and replacement, service connections, valves, hydrants, trench repair, concrete work, and pavement restoration.

Experience
Underground Projects
 247th Street Area Water Main Replacement – City of Lomita  Rancho Cucamonga Sports Center Sewer Line Replacement Project – City of Rancho Cucamonga  Water Main Replacement Project on Westerly Dr., New Ridge Dr., Bay Ridge Dr., Riverside Ave., and Dallas Ave. – Western Municipal Water District
Above Ground Projects
 Downtown Alley Improvement Project – City of Arcadia
 Area 3 Residential and Collector Streets Rehabilitation & Arterial Street Rehabilitation Project – City of Diamond Bar  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Various Encroachment Permit Projects – City of El Monte  Neighborhood Slurry Seal Area 5 Project – City of La Mirada  Slurry Seal of Imperial Highway Project – City of La Mirada  Slurry Seal of Imperial Highway from Wicker Drive to East City Limits, and Artesia Boulevard from Valley View Avenue to Knott Avenue – City of La Mirada
 Street Reconstruction for Various Streets in Zones C&F Project – City of Lomita  Dog Park at Garvey Park Project – City of Rosemead
 Heideman School Park Project – City of Tustin
Mr. Zamora has over twenty (20) years of construction experience specializing in public works inspection, code compliance, plan review, right-of-way and encroachment permits, utility coordination, traffic control, and construction documentation. His experience includes water, roadway, drainage, concrete and asphalt improvements, sidewalks, curb and gutter, storm drains, MEP systems, and other municipal infrastructure. He coordinates effectively with contractors, engineers, utility companies, and City staff while ensuring compliance with plans, specifications, permits, and applicable federal, state, and municipal requirements. He has worked on projects involving major roadway reconstruction, including base repairs, asphalt pavement placement, concrete and accessibility improvements, and appurtenant work items.

Experience
Underground Projects
 Multiple Water and Storm Drain Encroachment Permit Projects – City of Aliso Viejo  Multiple Underground Utility Encroachment Permit Projects – City of Anaheim  Multiple Underground Utility Encroachment Permit Projects – City of Long Beach  Aliso Viejo Ranch and Facilities Water and Storm Drain Restoration Project – Moulton Niguel Water District Above Ground Projects
 Citywide Road Reconstruction Project, from Aliso Viejo Parkway to Enterprise Street – City of Aliso Viejo  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  FY 2024/25 Street Rehabilitation & FY 2025/26 Sidewalk Replacement Projects – City of Lawndale Jesse Di Stefano
Construction
Observer/Inspector, LAE
Education
 Cal-OSHSA class, Construction
Estimating, Mechanical,
Architectural, Civil Drafting and
Auto CADD, Trench Safety
Key Skills
Construction Inspection
& Utility Coordination
Years of Experience
35 years
Years with LAE
4 years
Marco A. Zamora
Construction
Observer/Inspector, LAE
Education
 A.S. and A.A., Santiago Canyon Clg.  Building Inspection Technology, Coastline Community College
Key Skills
Construction Inspection
& Utility Coordination
Years of Experience
20 years
Years with LAE
Approx. 1 year
Tuesday, October 20, 2026 Reg CC MTG, Page *211
Zone G Water Main Replacement Project Page | 6
City of Lomita
Mr. Di Stefano has over thirty-five (35) years of experience in the engineering and construction field, including eighteen (18) years with the City of Roseburg, providing engineering, management, and construction inspection support for a wide range of Public Works Capital Improvement Program (CIP) projects. His experience includes both above-ground and underground infrastructure projects such as street improvements, concrete work, sidewalks, curbs, gutters, paving, irrigation and landscaping, as well as pipeline installations, waterline replacements, and water system improvements. He has inspected numerous water main replacement projects for Golden State Water Company (GSWC) across Southern California and has extensive experience coordinating with contractors, monitoring traffic control, reviewing construction schedules, and ensuring compliance with plans, specifications, and contract requirements for both roadway and utility projects.

Experience
Underground Projects
 247th Street Area Water Main Replacement Project – City of Lomita Above Ground Projects
 First Street Arterial Pavement Rehabilitation – City of Arcadia  Area 3 Residential and Collector Streets Rehabilitation and Arterial Street Rehabilitation Project – City of Diamond Bar
 Clora Place and Schmidt Road Street Improvement Project – City of El Monte  Street Reconstruction Zone G – Phase 1 Project – City of Lomita  Fiscal Year 25 – 26 Annual Pavement Preservation Project (APPP) – Zone 7B – City of Yorba Linda Construction Management Support Staff
Ms. Palacios is a highly skilled Civil Engineering Professional with proficiency in AutoCAD, Q-Gis, OSPI, O-calc, and Microsoft Suite. She excels in forecasting, reviewing, and actualizing construction projects, consistently delivering them on time and within budget. Ms. Palacios plays a key role in supporting Project/Construction Management efforts, providing office engineering services, and ensuring seamless coordination between teams for successful project execution. She has experience in coordinating construction drawings, managing relationships with A&E vendors, and designing fiber routes.

Her previous experience included overseeing splicing and construction for numerous fiber and utility projects sites, managing complex project timelines, and ensuring compliance with regulatory standards. She has worked on Capital Improvement Program (CIP) and infrastructure projects such as Street Improvement and Water Main Replacement projects.

Experience
Underground Projects
 247th Street Area Water Main Replacement Project – City of Lomita  Rancho Cucamonga Sports Center Sewer Line Replacement Project – City of Rancho Cucamonga  Orangecrest Water Main Replacement Project at Gustin Road, Gila Way, Colt Street, and Woodlake Drive – Western Municipal Water District
 Lake Matthews Water Main Replacement Project at Barton Street, Rancho Verde Circle, Rancho Viejo Drive, Saddle Crest Place, and Rawhide Lane – Western Municipal Water District Above Ground Projects
 City Wide Street Resurfacing Project – City of Claremont  College Avenue Pedestrian and Bike Improvements Project – City of Claremont  Arrow Highway Transit Improvements, First Street Pavement Rehabilitation, and Indian Hill Boulevard I-10 Street Improvements Project – City of Claremont
 College Avenue Pedestrian and Bike Improvements Project – City of Claremont  Area 3 Residential and Collector Streets Rehabilitation and Arterial Street Rehabilitation Project – City of Diamond Bar
 Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar Melissa Palacios
Assistant Construction
Manager/Office Engineer, LAE
Education
 B.S. in Civil Engineering
Key Skills
Project
Coordination
Years of Experience
3 years
Years with LAE
2 years
Tuesday, October 20, 2026 Reg CC MTG, Page *212
Zone G Water Main Replacement Project Page | 7
City of Lomita
 Parking Lot and Street Improvements – Elsinore Valley Municipal Water District  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Street Reconstruction Zone G – Phase 1 Project – City of Lomita  Neighborhood Slurry Seal Area 5 Project – City of La Mirada  Slurry Seal of Imperial Highway Project – City of La Mirada  Manhattan Beach Boulevard Eastbound Left-Turn Improvements at Aviation Boulevard Project – City of Manhattan Beach
 Fiscal Year 25 – 26 Local Slurry Seal Pavement Rehabilitation – City of Rancho Cucamonga  Fiscal Year 25–26 Annual Pavement Preservation Project (APPP) – City of Yorba Linda Mr. Parkin is a Junior Engineer with a Civil Engineering educational background, bringing the latest knowledge in the field.

He supports Project Managers, Construction Managers, Construction Inspectors, and Civil Engineering personnel with dayto-day operations. His experience includes preparing Working Day Reports and Weekly Statements of Working Days, reviewing Public Works Engineering plans and specifications, and formatting inspection reports and bid documents. He brings strong analytical abilities, proficiency with modern engineering tools, and quickly adapts to new processes and field environments. His responsibilities also include maintaining project records and assisting with coordination between field and office teams. He has gained exposure to field operations, documentation, and public works standards. Representative assignments include transit, pavement rehabilitation, complete streets, slurry seal, and intersection improvements for the Cities of Claremont, Diamond Bar, Fontana, La Mirada, Manhattan Beach, and Rancho Cucamonga, as well as water main replacement work for Western Municipal Water District and sewer line replacement for the City of Rancho Cucamonga.

Experience
Underground Projects
 247th Street Area Water Main Replacement Project – City of Lomita  Rancho Cucamonga Sports Center Sewer Line Replacement Project – City of Rancho Cucamonga  Orangecrest Water Main Replacement Project at Gustin Road, Gila Way, Colt Street, and Woodlake Drive – Western Municipal Water District
Above Ground Projects
 Arrow Highway Transit Improvements, First Street Pavement Rehabilitation, and Indian Hill Boulevard I-10 Street Improvements Project – City of Claremont
 Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Manhattan Beach Boulevard Eastbound Left-Turn Improvements at Aviation Boulevard Project – City of Manhattan Beach
 Fiscal Year 25 – 26 Local Slurry Seal Pavement Rehabilitation – City of Rancho Cucamonga  Fiscal Year 25–26 Annual Pavement Preservation Project (APPP) – City of Yorba Linda Sub-Consultants
LAE has included GCAP Services, Inc. (GCAP) for Labor Compliance Services, Geo-Advantec, Inc. for Geotechnical and Materials Testing Services, and Onward Engineering (OE) for Design Support Services as our sub-consultants on an asneeded basis to support specific project requirements.

Sylvia Linn has over seventeen (17) years of experience in compliance and assessment-related services. She leads labor compliance practices and provides clients with audit, assessment, and studyrelated support. She has extensive experience delivering both California and federal prevailing wage consulting services, and she routinely leads audits and studies, conducting analytical reviews of existing practices, and developing best practices and
Sylvia Linn
Labor Compliance Manager, GCAP
Services, A DBE Firm
Education
J.D., M.B.A.

Years of Experience
17 years
Jacob Parkin
Junior Engineer,
LAE
Education
 B.S. in Civil Engineering
Key Skills
Project
Coordination
Years of Experience
Approx. 1 year
Years with LAE
Approx. 1 year
Tuesday, October 20, 2026 Reg CC MTG, Page *213
Zone G Water Main Replacement Project Page | 8
City of Lomita
recommendations to improve procedures and processes. Since 2014, GCAP Services, under her leadership, has provided DBE and Labor Compliance services to LAE projects in the cities of Arcadia, Azusa, Baldwin Park, Brea, Chino, Claremont, Compton, CVAG, Diamond Bar, El Monte, Elsinore Valley Municipal Water District, Fontana, Laguna Niguel, Lomita, Manhattan Beach, Montclair, Norwalk, Perris, Pomona, San Dimas, Seal Beach, Signal Hill, Ventura, and Western Municipal Water District.

Projects with LAE
Underground Projects
 247th Street Area Water Main Replacement Project – City of Lomita  Water Main Replacement Project on Westerly Dr., New Ridge Dr., Bay Ridge Dr., Riverside Ave., and Dallas Ave. – Western Municipal Water District
 Orangecrest Water Main Replacement Project at Gustin Road, Gila Way, Colt Street, and Woodlake Drive – Western Municipal Water District
 Lake Matthews Water Main Replacement Project at Barton Street, Rancho Verde Circle, Rancho Viejo Drive, Saddle Crest Place, and Rawhide Lane – Western Municipal Water District Above Ground Projects
 Gold Line Station Pedestrian Linkage Project – City of Arcadia  Foothill Boulevard and Palm Drive Traffic Signal Project (Federal Project) – City of Azusa  Central Avenue Pavement Rehabilitation Project – City of Compton  Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement Project – City of Compton  Phase I of Street Pavement Resurfacing – City of El Monte  Phase II of the Slurry Seal/Overlay Project – City of El Monte  Parking Lot and Street Improvements – Elsinore Valley Municipal Water District  Citrus Avenue at Ceres Avenue Traffic Signal Project – City of Fontana  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Crown Valley Parkway Pavement Rehabilitation Project – City of Laguna Niguel  Street Reconstruction for Various Streets in Zones C&F – City of Lomita  Street Reconstruction Zone G – Phase 1 Project – City of Lomita Shawn Ariannia of GAI will be assigned as the Geotechnical Engineer for the project. Mr. Ariannia and his geotechnical team bring unique knowledge, expertise, and recent experience in Geotechnical Engineering, Pavement Engineering (including Cold Central Plant Recycling, Full Depth Reclamation, ARHM paving and processes), and laboratory testing of soil. Mr. Ariannia and his team will be available to support the City’s Task Orders and fulfill all contract requirements.

Since 2016, GAI has provided Geotechnical and Material Testing Services to LAE’s projects in the cities of Arcadia, Azusa, Chino, Compton, El Monte, Lomita, and Montclair.

Projects with LAE
 Gold Line Station Pedestrian Linkage Project – City of Arcadia  Foothill Boulevard and Palm Drive Traffic Signal Project (Federal Project) – City of Azusa  Central Avenue Pavement Rehabilitation Project – City of Compton  Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement Project – City of Compton  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Crown Valley Parkway Pavement Rehabilitation Project – City of Laguna Niguel  Street Reconstruction for Various Streets in Zones C&F – City of Lomita  Street Reconstruction Zone G – Phase 1 Project – City of Lomita  2nd Stage of Construction of the Local Streets Rehabilitation Paving Improvements – City of Norwalk Shawn Ariannia, Ph.D., P.E., G.E.

President/Principal, Geo-Advantec, Inc. (GAI)
Education
Ph.D. in Geotechnical Engineering
M.S. in Civil Engineering
B.S. in Civil Engineering
Tuesday, October 20, 2026 Reg CC MTG, Page *214
Zone G Water Main Replacement Project Page | 9
City of Lomita
Delfino R. Consunji, P.E., will lead Onward Engineering’s constructionphase design support. His experience includes water and utility infrastructure, contractor coordination, constructability evaluation, and resolution of complex field conditions. Onward Engineering brings more than 20 years of experience providing design engineering, project management, construction management, inspection, and constructionsupport services for municipal public works projects. Its relevant watermain experience includes the Mauna Loa Avenue Water Main Installation and Street Improvements Project in Glendora, involving 6,400 LF of new 8-inch water main, and the Cycle 1 Water Main Infrastructure Improvement Project in Manhattan Beach, involving more than 3,200 LF of 6- and 8-inch ductile-iron pipe. This experience provides Onward with a strong understanding of pipeline installation, valves, utility coordination, traffic control, pavement restoration, constructability review, RFIs, material submittals, field conditions, and municipal documentation requirements.

Projects with LAE
 247th Street Area Water Main Replacement Project – City of Lomita Resumes
Detailed resumes can be found in the Appendix Section of LAE’s On-Call CM and Inspection Services proposal to the City.

Team’s Availability
LAE’s Construction Management and Inspection team along with our selected sub-consultants are fully available and committed to making this project a success. Our team is ready to dedicate the necessary resources, managing our workload efficiently to prioritize this project. With our expertise and reliable partnership, we'll ensure timely delivery and exceed expectations. Key personnel will be available to the extent proposed for the duration of the required services and no person designated as “key” shall be removed or replaced without prior written concurrence of the City. The following table presents the estimated percentage of each team member’s availability that will be dedicated to this project.

Name Title Availability/Expected
Contribution
Project/Construction Managers
Kevin Alamolhoda, P.E. Senior Project/Construction Manager, LAE 75% Construction Management Support Staff
Melissa Palacios Assistant Construction Manager/Office Engineer, LAE 85% Jacob Parkin Junior Engineer, LAE 85%
Construction Observers/Inspectors
Ned Shaffer Construction Observer/Inspector, LAE 100%
Marco Zamora Construction Observer/Inspector, LAE 100%
Jesse Di Stefano Construction Observer/Inspector, LAE 100% Sub-Consultants
GCAP Services (DBE Firm) Labor Compliance Sub-Consultant, GCAP 100% Geo-Advantec, Inc. Material Testing Sub-Consultant, GAI 100% Onward Engineering Design Support Services, OE 100%
Our team has the capacity and resources to fully support this project without impacting performance, ensuring timely coverage, communication, and responsiveness.

Delfino R. Consunji, P.E.

Construction Manager, Onward Engineering
(OE)
Education
M.S. in Civil Engineering
B.S. in Civil Engineering
Tuesday, October 20, 2026 Reg CC MTG, Page *215
Zone G Water Main Replacement Project Page | 10
City of Lomita
Firm Experience
LAE is exceptionally well-suited to provide Construction Management and Inspection services for the City of Lomita because of our direct experience supporting the City and our extensive background delivering municipal public works and capital improvement projects throughout Southern California. Most relevant to this assignment, LAE provided services for the 247th Street Area Water Main Replacement Project and Walnut Street Water Main Replacement Project, involving water pipeline construction, shutdowns and connections, utility coordination, trenching and backfill, materials testing, pavement restoration, inspection, documentation, and compliance with City requirements. LAE has also supported the City on the FY 2019/2020 Street Improvement Program, Street Reconstruction Zone G – Phase 1 Project, and Street Reconstruction for Various Streets in Zones C & F. This experience gives LAE a strong understanding of the City’s water system, infrastructure priorities, construction conditions, administrative procedures, documentation expectations, and public works delivery needs.

Previous Experience/Projects with City
247th Street Area Water Main Replacement Project
Client: City of Lomita
Duration: June 2024 to On-Going
Description: The project included the replacement of aging and undersized water mains and the relocation of pipelines from private properties into accessible public rights-of-way. The project involved traffic control and the installation of 3,920 LF of 8-inch PVC pipe, 18 gate valves, 3 fire hydrants, 24 water service replacements, 10,295 SF of asphalt pavement base course, 129 tons of asphalt pavement cap, 795 SF of PCC bus pad, and 18 traffic signal loop detectors. The work also required close coordination of water service interruptions, utility conflicts, traffic control, residential access, and pavement restoration throughout construction.

Project Funding Type: FEMA Hazard Mitigation Grant, Local Water Fund Construction Cost: $1.3 million
LAE’s Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance Services
Walnut Street Water Main Replacement (On-Call CM&I)
Client: City of Lomita
Duration: June 2019 to February 2020
Description: The work included approximately 1,800 LF of 4”, 6”, and 8” C900 DR 14 and 18 water main replacements, installation of 22 gate valves (4”, 6”, and 8”), and 27 water services (1”, 2”, 3”, and 4”). It also included the removal and replacement of 4 fire hydrants, application of approximately 400 SY of AC pavement base, and removal and construction of about 2,200 SF of cross gutters and nearly 800 LF of curb and gutter. The project further included 10,300 SY of cold milling and placement of over 1,000 tons of asphalt concrete (AC) and asphalt rubber hot mix (ARHM).

Funding Type: Various Street and Water Funds
Construction Cost: $1.6 million
LAE Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance Services
FY 2019/2020 Street Improvement Program Project
Client: City of Lomita
Duration: September 2020 to November 2020
Description: The work included the removal of existing thermoplastic and painted striping, pavement markings, and legends; removal of raised pavement markers; application of bituminous pavement crack sealant; application of skin patch/level course; application of chip seal; and application of slurry seal in designated areas. The project also included the installation of new striping, pavement markings, legends, and raised pavement markers. Additional tasks included sweeping before and after slurry seal applications, removal of grease spots by grinding, traffic control, protection of all utility covers in place, and installation of temporary pavement markers.

Project Funding Type: Local Funds
Construction Cost: $500,000
LAE’s Duties: Construction Management, Construction Observation/Inspection, and Materials Testing Services Street Reconstruction Zone G – Phase 1 Project
Client: City of Lomita
Duration: October 2024 to October 2025
Tuesday, October 20, 2026 Reg CC MTG, Page *216
Zone G Water Main Replacement Project Page | 11
City of Lomita
Description: The project involved traffic control, clearing and grubbing, removal and construction of 4-inch PCC sidewalk, 8-inch PCC cross gutter, variable height 5-inch to 7.5-inch curb and gutter, and PCC curb ramps. Work also included construction of PCC retaining curb, removal of 26,640 CY of the entire pavement section and base, construction of 2,565 tons of asphalt concrete and 1,370 CY of crushed aggregate base. Additional tasks included adjustment of sewer and storm drain manhole frames and covers to grade, adjustment of water and gas valve boxes and covers to grade, and removal and installation of striping, markings, legends, reflectors, and raised pavement markers.

Project Funding Type: Local Street Fund
Construction Cost: $1.6 million
LAE’s Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance Services
Street Reconstruction for Various Streets in Zones C&F
Client: City of Lomita
Duration: April 2022 to October 2022
Description: The work generally consisted of furnishing all labor, materials, tools, equipment, and incidentals necessary to rehabilitate the pavement on various streets in Zones C&F, and to upgrade all curb ramps to current ADA standards, as specified in the specifications and Special Provisions, and as directed by the Engineer. The work included over 1,000 SF of sidewalk construction, the removal and construction of 2,450 SF of cross gutter, approximately 700 LF of curb and gutter, and 35 curb ramps. It also included over 200,000 SF of cold milling and grinding, over 7,000 tons of AC, ARHM, and AC base course, and the adjustment of 54 manholes and 56 water valves.

Funding Type: Various Local Funds
Construction Costs: $2.25 million
LAE Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance Services
Previous Experience/Projects with Other Cities and Agencies Beyond our direct experience with the City, LAE has delivered construction management and inspection services for water main replacements, pipeline installations, water services, valves, fire hydrants, utility relocations, trench restoration, and related municipal infrastructure improvements. Our expertise in pipeline inspection, contract administration, labor compliance, materials testing, schedule and cost control, utility coordination, public outreach, and project closeout enables us to serve as a responsive extension of City staff and deliver water infrastructure projects safely, efficiently, and in accordance with quality, schedule, and budget objectives. Below is a summary of LAE’s relevant water and utility projects completed for other cities and public agencies.

Underground Projects
Client Project Name Duration Project
Cost
City of Chino Quadrant 1, Phase 1 Water Main Replacement Nov 2016 to Feb 2021
$2 million
City of Chino Quadrant 2, Phase 2 Water Main Replacement Nov 2016 to Oct 2020
$830,000
City of Chino Quadrant 3, Phase 1 Water Main Replacement Nov 2016 to June 2019
$1.1 million
City of Chino Quadrant 3, Phase 2 Water Main Replacement Nov 2016 to Feb 2022
$923,000
City of Chino Sewer Re-Lining (On-Call CM/PM) April 2019 to Feb 2020
$500,000
City of Chino Santa Ana Place, Victoria Avenue, Ramona Avenue Water Main Replacement Project (On-Call CM/PM)
Dec 2019 to Feb
2021
$259,265
City of Chino Pipeline Storm Drain Replacement Project (On-Call CM/PM)
Dec 2019 to Feb
2021
$55,125
City of Chino Central Avenue Water Main Replacement Project July 2019 to Feb 2022
$1.8 million
Tuesday, October 20, 2026 Reg CC MTG, Page *217
Zone G Water Main Replacement Project Page | 12
City of Lomita
City of Chino Washington Avenue, Lincoln Avenue, Monte Vista Avenue and Telephone Avenue Water Main
Replacements (On-Call CM/PM)
July 2019 to Oct
2021
$2,430,000
City of Chino Well 11 Raw Water Transmission Main (On-Call CM/PM) May 2022 to Mar 2023
$2.93 million
City of Chino Yorba Avenue and Eucalyptus Avenue Sewer Main Replacement Project (On-Call CM/PM)
Nov 2022 to Mar
2023
$4.4 million
City of Chino 3 Bridges Benson Avenue Permanent Pump Station June 2021 to Mar 2023
$1,100,000
City of El Monte Water Main Replacement South of Bryant Road Between Peck Road & Tyler Avenue (On-Call CM&I)
July 2023 to April
2024
$3.4 million
City of Fontana Courtplace Housing Development Infrastructure Improvements
Jan 2024 to OnGoing$4,870,000
City of La Mirada La Mirada Boulevard Drainage Improvements May 2023 to Dec 2023
$300,000
City of Lomita 247th Street Area Water Main Replacement Project June 2024 to OnGoing$1.3 million City of Lomita Walnut Street Water Main Replacement (On-Call CM&I) June 2019 to Feb 2020
$1.6 million
Western Municipal
Water District
Water Main Replacement Project on Westerly Dr., New
Ridge Dr., Bay Ridge Dr., Riverside Ave., and Dallas Ave.

July 2023 to June
2024
$3.5 million
Western Municipal
Water District
Orangecrest Water Main Replacement Project at Gustin
Road, Gila Way, Colt Street, and Woodlake Drive
Feb 2025 to OnGoing$3.2 million
Western Municipal
Water District
Lake Matthews Water Main Replacement Project at
Barton Street, Rancho Verde Circle, Rancho Viejo Drive, Saddle Crest Place, and Rawhide Lane
Feb 2025 to OnGoing$4 million
Tuesday, October 20, 2026 Reg CC MTG, Page *218

SCOPE OF WORK AND PROJECT APPROACH
Tuesday, October 20, 2026 Reg CC MTG, Page *219
Zone G Water Main Replacement Project Page | 12
City of Lomita

SCOPE OF WORK AND PROJECT APPROACH
Understanding the Need
LAE understands that the City of Lomita is seeking a qualified firm to provide Construction Management, Construction Inspection, Labor Compliance, and Materials Testing services for the Zone G Water Main Replacement Project (Project No.

W-375).

LAE understands that the City is undertaking this project to replace aging water infrastructure, improve water-system reliability and fire-flow capacity, reduce the risk of leaks and service disruptions, and provide safe and accessible water-main alignments within the public right-of-way. Based on the station limits shown in the plan sheet index, the project extends approximately 1,792 LF along Walnut Street, 1,337 LF along Ebony Lane, and 1,050 LF along 247th Place, covering approximately 4,179 LF in total.

Within these limits, the existing water mains will be replaced with proposed 8-inch water mains, together with associated connections, valves, water services, fire hydrants, testing, disinfection, trench backfill, traffic control, and pavement restoration. Collectively, these improvements will enhance the reliability, safety, and long-term performance of the City’s waterdistribution system.

The project includes water-main improvements along portions of the following roadways:
 Walnut Street
 Ebony Lane
 247th Place
LAE will function as a responsive extension of the City’s Public Works staff and provide dedicated oversight throughout construction. Our responsibilities will include construction management and inspection, contractor coordination, contract administration, schedule and cost monitoring, quantity verification, progress payment review, change order management, labor and federal compliance coordination, materials testing coordination, permit compliance, utility and shutdown coordination, traffic control monitoring, public outreach, documentation, and project closeout. LAE will also coordinate this work with the concurrent Street Reconstruction Project – Zone G Phases 3 & 4 to prevent conflicts and avoid disturbance of newly completed pavement.

We will be managing the construction activities, materials testing, geotechnical services, community relations contacts, and field inspection. Resident Engineering services will be provided for submittal coordination, pay requests, change order management and control, quality control, and general Construction Management services to support the construction efforts.

Technical items and submittal reviews will be coordinated with the Engineer of Record (EOR), Delfino R. Consunji, P.E., of Onward Engineering, for this project. LAE worked with Onward Engineering on the 247th Street Area Water Main Replacement Project. The items will be documented and provided to the contractor, construction management and inspection team, and the City Project Manager. LAE will maintain the construction records and transmit them in an orderly and timely fashion to the City during and at the conclusion of the work. The construction duration of this project will be followed, according to the final specifications. The LAE team will review the Construction Contract documents for this project.

The project sites and project vicinity will be visited. We will participate in Pre-Bid meetings if requested. LAE will have a grasp of the project location and be aware of the proximity of the construction work to homes, schools and businesses.

The following are additional project understandings:
 The City intends to present the proposed task order for City Council approval at its October 6, 2026 meeting.  Based on the provided 100% plans, the project is currently awaiting EPA approval, and the City anticipates advertising it for construction by September 11, 2026. The bid due date and bid opening date have not yet been provided.  The project is receiving federal funding through an EPA Community Grant; therefore, compliance with applicable federal funding, labor, documentation, and reporting requirements will be necessary.  The anticipated construction duration is 90 working days. The Water Main Replacement Project is expected to begin approximately one to two months before and overlap with the Street Reconstruction Project – Zone G Phases 3 & 4.  LAE will assign a dedicated Construction Observer/Inspector to the Water Main Replacement Project. Backup personnel will be available for simultaneous critical activities, authorized overtime, or work at multiple locations.

Figure 1: Project Location
Tuesday, October 20, 2026 Reg CC MTG, Page *220
Zone G Water Main Replacement Project Page | 13
City of Lomita
 LAE will perform or assist with community outreach, water-shutdown notifications, traffic advisories, and the resolution of concerns from affected residents and businesses, as requested by the City.  Traffic and pedestrian control will be required along the project limits on Walnut Street, Ebony Lane, and 247th Place, including areas near intersections, driveways, and active construction zones.  Coordination will be required with City staff, the City of Lomita Water Division, Los Angeles County Sheriff’s Department, Los Angeles County Fire Department, EPA and other funding representatives, Caltrans, City of Los Angeles, utility companies, waste collection services, the Street Reconstruction contractor, and other affected stakeholders.
 The project requires encroachment permits from Caltrans and the City of Los Angeles. LAE will coordinate permit requirements and monitor the contractor’s compliance with all applicable conditions.  Construction access, equipment staging, trenching operations, temporary water service, and laydown areas will be coordinated with the City to minimize impacts on residents, businesses, traffic, emergency services, and water customers.
 Land use and zoning within and adjacent to the project limits are primarily residential, with nearby businesses, schools, community facilities, and existing utility infrastructure.

Coordination with the Street Reconstruction Project – Zone G Phases 3 & 4 LAE understands that the Zone G Water Main Replacement Project will overlap with the City’s Street Reconstruction Project – Zone G Phases 3 & 4, with the water project expected to begin approximately one to two months earlier. Water main improvements are planned along Walnut Street, Ebony Lane, and 247th Place, which are also included in the street rehabilitation project. Close coordination between the two contractors, the City, utility agencies, and both project teams will therefore be essential. LAE will coordinate schedules, work areas, utility activities, traffic control, testing, trench backfill, temporary pavement restoration, and final paving to prevent conflicts and avoid disturbing newly completed improvements.

Water main installation, testing, disinfection, tie-ins, backfill compaction, and utility adjustments will be closely tracked so affected roadway sections can be released for street rehabilitation in a timely manner. LAE will maintain coordinated lookahead schedules and interface logs and promptly identify activities that could affect either project’s schedule, cost, quality, or public access. A dedicated Construction Observer/Inspector will be assigned to the Water Main Replacement Project, while LAE’s Resident Engineer/Project Manager and support team members will coordinate activities across both contracts.

Existing Roadway and Site Conditions
An overview of pavement conditions, surroundings, and site features for each roadway is given below. 247th Place
247th Place is a local dead-end residential roadway lined with single-family homes, landscaped front yards, driveways, sidewalks, and curb and gutter on both sides.

On-street parking is common, and residential waste containers may occupy portions of the curbside on collection days. The existing asphalt pavement shows signs of aging, including longitudinal and transverse cracking, surface wear, patching, and previous utility-cut repairs. Based on the project plans, approximately 1,050 LF of proposed 8-inch water main will be installed along 247th Place, together with associated connections, valves, services, testing, trench backfill, and pavement restoration. Since the street has limited access and numerous residential driveways, construction sequencing, water-service continuity, shutdown notifications, emergency access, waste collection, parking restrictions, and continuous property access will require close coordination throughout the work.

Ebony Lane
Ebony Lane is a two-lane neighborhood collector that connects residential streets with Lomita Boulevard and the surrounding commercial area. The roadway is bordered by single-family homes, driveways, sidewalks, curb and gutter, on-street parking, mature trees, overhead utilities, and community facilities, including Lomita Kiwanis Gardens and King’s Way Community Church. The existing asphalt pavement shows extensive longitudinal, transverse, and interconnected cracking, surface wear, utility-cut repairs, and localized patching, while the centerline striping is worn in several areas. Based on the project plans, approximately 1,337 LF of proposed 8-inch water main will be installed along Ebony Lane, together with associated connections, valves, services, testing, trench backfill, and pavement Figure 3: Existing Conditions of
Ebony Lane
Figure 2: Existing Conditions of 247th
Place
Tuesday, October 20, 2026 Reg CC MTG, Page *221
Zone G Water Main Replacement Project Page | 14
City of Lomita
restoration. Since Ebony Lane carries through traffic and provides access to residences, businesses, and community facilities, staged trenching and traffic control, water-service continuity, driveway access, pedestrian safety, and emergency access will require close coordination.

Walnut Street
Walnut Street is a north-south neighborhood roadway that connects several residential streets with the commercial area near Lomita Boulevard. The corridor is bordered primarily by single-family homes, driveways, sidewalks, curb and gutter, on-street parking, mature landscaping, fire hydrants, and overhead utilities. The existing asphalt pavement shows surface damages, longitudinal and transverse cracking, localized patching, previous utility repairs, and wear around manholes and other utility covers. The centerline striping is also faded in several areas. Based on the project plans, approximately 1,792 LF of proposed 8-inch water main will be installed along Walnut Street, together with associated connections, valves, water services, testing, disinfection, trench backfill, and pavement restoration. LAE will closely coordinate traffic control, water-service continuity, planned shutdown notifications, property access, utility conflicts and adjustments, pedestrian movements, and the concurrent street reconstruction work.

Experience and Lessons Learned
LAE brings direct and highly relevant experience delivering water main replacement projects for the City of Lomita. Through the 247th Street Area Water Main Replacement Project and Walnut Street Water Main Replacement Project, LAE provided construction management, construction observation/inspection, materials testing, and labor compliance services for the installation and replacement of approximately 5,700 LF of water mains at the City. These projects included pipeline relocations, connections and tie-ins, gate valves, water services, fire hydrants, trenching and backfill, pavement restoration, concrete improvements, traffic signal loop replacement, and coordination within active residential and commercial corridors.

This experience has provided LAE with a strong understanding of the City’s water infrastructure, construction standards, documentation requirements, and expectations for contractor oversight. Key lessons learned that will be applied to the Zone G Water Main Replacement Project include:
 Verify existing utilities, connection points, service locations, and field conditions before excavation to reduce conflicts, delays, and change orders.
 Closely coordinate shutdowns, tie-ins, testing, disinfection, and service transfers to minimize interruptions and maintain reliable water service.
 Monitor pipe installation, bedding, backfill, compaction, and testing at each stage so deficiencies are corrected before trenches are paved.
 Maintain advance notifications, clearly defined work zones, and continuous residential, business, pedestrian, emergency, and waste-collection access.
 Coordinate temporary and permanent pavement restoration with the overlapping Zone G Street Reconstruction Project to avoid damaging or repaving newly completed improvements.  Maintain complete records of installed quantities, service connections, valves, hydrants, testing results, labor compliance, change orders, and as-built conditions to support efficient project closeout.

Key Challenges
The Zone G Water Main Replacement Project will require proactive coordination and close field oversight to address the following key challenges:
 Identifying existing utilities and resolving conflicts before and during excavation.  Coordinating water shutdowns, tie-ins, disinfection, testing, and service transfers while minimizing customer interruptions.
 Maintaining residential access, emergency response, waste collection, pedestrian movement, and local traffic through active work areas.
 Monitoring pipe installation, bedding, backfill, compaction, and pavement restoration to ensure compliance with project requirements.
 Coordinating Caltrans and City of Los Angeles encroachment permits and complying with EPA Community Grant and labor compliance requirements.

Figure 4: Existing Conditions of
Walnut Street
Tuesday, October 20, 2026 Reg CC MTG, Page *222
Zone G Water Main Replacement Project Page | 15
City of Lomita
 Coordinating construction sequencing with the overlapping Zone G Street Reconstruction Project to prevent conflicts and avoid disturbing completed improvements.
 Completing the work within the anticipated 90-working-day construction period while accommodating permitting, testing, shutdown, and restoration activities.
 Addressing unforeseen subsurface conditions, undocumented utilities, unsuitable soils, groundwater, and discrepancies between the plans and actual field conditions.  Managing limited staging and material-storage areas within residential corridors while minimizing noise, dust, parking restrictions, and neighborhood disruption.

Scope of Work and Project Approach
LAE’s project approach is built on a thorough understanding of the City’s objectives, project requirements, and anticipated challenges. Drawing on our proven expertise in construction management, construction observation/inspection, labor compliance, and material testing, we will deliver a proactive, solutions-focused approach that emphasizes quality, safety, schedule adherence, and cost control. The following tasks outline LAE’s responsibilities and approach in delivering comprehensive services for the City from pre-construction to project closeout, ensuring quality, efficiency, and compliance.

Task 1 – Constructability Review
LAE will conduct a thorough and systematic constructability review upon execution of the Professional Services Agreement (PSA). This process will ensure that all construction plans, specifications, and related documents are clear, feasible, and optimized for efficient execution before work begins in the field. By identifying and addressing potential challenges early, LAE will help the City avoid costly delays, change orders, and rework during construction.

Our review will be led by our experienced Senior Construction Manager and Construction Observer/Inspector in coordination with the City’s project management team, the design consultant, and other stakeholders as necessary. We will utilize our extensive municipal construction experience to ensure that the project is ready for successful execution.

The constructability review will include, but not be limited to, the following actions:
 Examine all construction drawings and specifications to verify completeness, accuracy, and consistency with applicable Federal, State, and local standards.  Identify any design ambiguities, missing details, or potential conflicts within the documents that could impact construction efficiency.
 Assess whether the design and specifications allow for practical sequencing of work and efficient contractor mobilization and demobilization.
 Evaluate existing site conditions in relation to the design to confirm constructability and identify potential constraints such as staging areas, site access, and traffic control requirements.  Identify cost-effective alternatives to materials, methods, or phasing that will maintain quality while reducing cost or construction time.
 Highlight potential construction challenges, such as space limitations, weather-dependent activities, or complex coordination requirements, and propose proactive mitigation measures.  Verify proposed water-main alignments, tie-in locations, service connections, valves, fire hydrants, trench limits, utility crossings, and required utility separations against existing field conditions.  Evaluate construction phasing, temporary water shutdowns, testing, disinfection, bacteriological clearance, service transfers, and final system activation to minimize customer interruptions.  Confirm the constructability and sequencing of work within Caltrans and City of Los Angeles rights-of-way and incorporate all applicable encroachment-permit conditions.

Deliverables and Outcomes
 Summary of identified constructability issues, comments, and suggested considerations for the City’s review.  Updated mark-ups or redlined plan sheets will be prepared, where necessary, to clearly illustrate proposed adjustments.
 Coordination meetings will be held with the City and design team to finalize all approved changes prior to issuing the Notice to Proceed.

Figure 5: Water Main Replacement
Tuesday, October 20, 2026 Reg CC MTG, Page *223
Zone G Water Main Replacement Project Page | 16
City of Lomita
Task 2 – Project Coordination
Kevin Alamolhoda, P.E., with over ten (10) years of municipal public works experience with LAE, will serve as the Resident Engineer (RE) for this project. He has successfully managed street reconstruction and improvement projects, water, sewer, traffic signal, and accessibility projects, ensuring compliance, cost control, and schedule adherence.

Mr. Alamolhoda will coordinate closely with LAE team members, City staff, contractors, and stakeholders to deliver the project efficiently and to the highest quality standards.

As the City’s selected Construction Management and Inspection (CM&I) Consultant, we will thoroughly review the Plans, Specifications, and Estimate (PS&E) package and conduct field walks to have a complete understanding of the project. Upon receiving the City’s Notice to Proceed with CM&I Services, we will request a kick-off meeting with the City’s Representative(s) to introduce our LAE team, discuss project details, and schedule. We will then send out a Pre-Construction Conference notice to schedule a meeting with the City’s representatives from various departments, project design team, contractor, sub-contractors, utility companies, LAE team, schools, neighboring cities (if applicable), and other stakeholders. LAE will prepare the Pre-Construction meeting agenda in accordance with the City’s guidelines for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
 Plans and Specifications.
 Project Schedule and Long Lead Items Procurement
Time.
 Submittals and the approval process.
 Geotechnical Materials Testing Services.
 Impacted Utilities.
 Water shutdowns.
 Hydrostatic pressure testing and leak checks.
 Chlorination and disinfection, flushing,
bacteriological testing.
 Labor Compliance Administration (Interviews, Payroll
Reviews, etc.).
 Weekly Statement of Working Day Reports.
 Contract Change Order (CCO) process.
 Coordination with the City Departments and other
impacted agencies.
 Street Sweeping, Truck Routes, and Waste Pickup
Schedules.
 EPA Community Grant requirements
 Coordination with transit companies and similar
entities.
 Schools, residents, and businesses that are affected
by the project.
 Public Notices.
 Construction Schedule.
 Traffic Control/Phasing Plan.
 Encroachment Permit(s).
 Agreed communication with the Construction
Manager and Project Inspector.
 Contract time.
 Progress meetings.
 Construction Observation process.
 Final project walkthrough.
 Punch list items.
 Preparation of as built drawings.
 Project acceptance and Other relevant details.

LAE will ensure all construction activities comply with the City’s Standards, contract documents, the Greenbook with supplements, approved deviations, and applicable industry standards.

Management, Meetings, Schedule/Budget and Miscellaneous Sub-tasks Scheduling, attending, and participating in meetings, preparing agendas, and minutes. Other tasks include overseeing LAE's Construction Observer/Inspector, reviewing construction schedule, coordination with City’s staff, design team, utility companies and other agencies, submittal reviews, traffic control plans’ review, striping plan review, progress payment requests, and Contract Change Orders. Additionally, LAE’s CM will review/resolve contract claims, assist with public outreach, monitor contractor’s survey work.For this project, LAE’s team will review waterworks material submittals, shutdown and tie-in plans, testing and disinfection procedures, traffic-control plans, and permit-compliance documentation.

Project Startup
LAE will provide the level of effort to inspect and monitor the Contractor’s work for commissioning and start-up of all individual systems, as well as overall start-up. LAE will monitor pressure testing, flushing, disinfection, bacteriological sampling, service transfers, valve operations, tie-ins, and final activation of the new water main. In collaboration with the City’s Water Department, LAE will verify that all pipelines, valves, fire hydrants, services, and related appurtenances are properly installed, tested, documented, and accepted before being placed into service.

Figure 6: Water Main Installation
Tuesday, October 20, 2026 Reg CC MTG, Page *224
Zone G Water Main Replacement Project Page | 17
City of Lomita
Schedule
Our approach to Schedule Control consists of having the contractor prepare a baseline schedule, laying out the project scope, milestones, key dates, critical path, and phases of work using scheduling software such as Microsoft Office, Primavera, etc. We will compare the contractor’s schedule with the contract document term(s) and determine the accuracy.

At progress meetings, construction schedule and “Look Ahead” activities are reviewed among other items. When activities slip from their proposed date of completion, we collaborate with the contractor to ensure a proper recovery plan. LAE’s CM will ensure that the Contractor updates the Project Schedule to represent up-to-date construction conditions and reflect the decisions made. Parties will be notified of any deviation from the schedule, and noncompliance will be corrected accordingly.

LAE will closely monitor the anticipated 90-working-day construction duration, including permit requirements, long-lead waterworks materials, shutdowns, testing, disinfection, service transfers, pavement restoration, and coordination with the overlapping Zone G Street Reconstruction Project.

Tasks Sep
'26
Oct
'26
Nov
'26
Dec
'26
Jan
'27
Feb
'27
Mar
'27
Apr
'27
CM&I Proposal Due
CM&I Final Selection
Anticipated Start of CM&I Services
Advertising Contract Documents for Bids
Bid Opening
City Council Approval of Construction Contract
City Staff to Mail Contact Documents to the Contractor
Pre-Construction Meeting
Contractor to Submit All Submittals for Review
City to Approve Contractor’s Bonds, Insurance
Certificates, and Contract

Acceptance of Contractor Submittals
Contractor to Mobilize
Start of Actual Construction
Complete Construction
The dates shown in the project timeline are estimates based on current assumptions and are subject to adjustment depending on actual project start, site conditions, and other factors.

Construction Contract Administration
As the City’s CM team, LAE will ensure that the construction duties of this project are conducted in line with the City’s contract documents, Standard plans, specifications, approved materials list, Standard Specifications for Public Works Construction (Green Book) with all supplements, any variation from or exception to the Standards, other City and industry standards. LAE will also verify compliance with applicable AWWA standards, EPA Community Grant requirements, the City's water-system standards, and Caltrans and City of Los Angeles encroachment-permit conditions.

Submittals and Requests for Information
Submittals and RFIs will be reviewed by LAE and the Engineer of Record to ensure any deviations of submittals submitted by the Contractor are equal to or of better quality than specified in the contract documents. To strengthen constructionphase coordination and facilitate the timely resolution of design-related matters, LAE has teamed with Onward Engineering, the project’s Engineer of Record, to provide specialized design-support services as an LAE subconsultant. Onward Engineering will assist with review of RFIs, material submittals, constructability reviews, and other design-related support services. A submittal log will be maintained to keep track of required submittals before and during the project work. These include but are not limited to: Shop Drawings, Traffic Control/Phasing Plans; Project Baseline Schedule; Contractor’s Emergency Contact List; Dig Alert ticket(s); Public Notification Letter; Material Haul Route(s); Mix designs; Certificates of compliance for materials; NPDES Requirements; Contractor's Safety Plan; Certified Payrolls; Solid Waste Management and Recycling Plan; Contractor’s Safety Meeting and other documentation. Submittals will be reviewed in a prompt manner.

Tuesday, October 20, 2026 Reg CC MTG, Page *225
Zone G Water Main Replacement Project Page | 18
City of Lomita
The City’s Construction Management Software, if applicable, will be used to have clear visibility of project documents. Watermain submittals may include pipe, fittings, restrained joints, valves, fire hydrants, water services, bedding and backfill materials, trench details, shutdown and tie-in plans, pressure-testing procedures, disinfection plans, bacteriological testing documentation, and pavement-restoration materials.

Web Based Document Control System
If applicable, LAE will utilize the City’s supplied construction management software to manage electronic and hard copy files, maintain a logging system including dates received and returned of all documents (submittals, RFIs, correspondence, etc.), upload and link files, provide notifications of overdue items, provide comments and feedback, review turnaround time, follow up on submittals needing to be resubmitted, manage personnel access to data, among other tasks. We will keep track of RFIs, submittals, O&M manuals, progress payments, change orders, and other items as agreed upon with the City, and provide regular reports as requested.

Review Traffic Control Plan
LAE will coordinate the review of the contractor’s traffic control plans required by the City and discuss them with the City’s Project Manager. The final plans will be approved by the City based on LAE’s comments and recommendations.

RFI Log
LAE will keep track of the Contractor’s RFI number, description, date of submittal, date of review, date of return, status, and reviewer of the RFI. Responses to RFIs will be done based on thorough review of the requested information, site visits, and consultation with the Designer and City staff.

Contract Change Orders
The CM will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval. CCOs will be reviewed with the Contractor, Inspector, and field verified prior to discussing them with the City.

Review of Contract Claims
Manage and coordinate potential issues before they escalate into formal claims. Provide assistance to City personnel in resolving disputes with parties involved, including utilities and contractors, to prevent disputes from arising.

Dispute Resolution
The CM will bring their prior project experience to prevent disputes from arising. By employing clear communication, project understanding, and effective management, LAE will proactively avoid potential disagreements. Disputes will be addressed professionally and resolved by referencing relevant project plans, specifications, and guidelines, such as the Greenbook, City Standard Operating Procedures, Caltrans manuals, American Water Works Association (AWWA), and others.

Design Clarifications
LAE will identify the need for design clarifications and request the Design Engineer to prepare the necessary clarification.

LAE will log and monitor all design clarifications. The Contractor will review design inquiries with field staff and the Construction Manager. LAE will request RFIs detailing the design clarification from the Contractor and will review them with the Designer. In collaboration with the Designer, LAE will provide a response to the Contractor to resolve the design issue, allowing construction to proceed at the clarification location.

Progress Billings
We will receive the Contractor’s monthly payment requests, review them with Construction Observation/Inspection Staff to ensure quantities are accurately stated, and provide the City with appropriate backup documentation. LAE will make a written recommendation for payment to the City.

Record Drawings
The Construction Observer (CO) will have a copy of the plans on the site with all up-to-date changes. The CO will review field changes with the contractor weekly to ensure changes are accurately documented. As-Built Drawings will reflect the installed construction as it was built. LAE will ensure that the As-Built Drawings are in compliance with the project plans, Figure 7: Transmission Pipeline
Tuesday, October 20, 2026 Reg CC MTG, Page *226
Zone G Water Main Replacement Project Page | 19
City of Lomita
specifications, and applicable codes and standards. Upon completion of construction, LAE will collect the As-Built Drawings, review them, and provide them to the City and/or involved parties. The As-Builts can then be delineated by the designer for preparation of the Record-Drawing.

Operations and Maintenance Manuals
LAE will coordinate the preparation of operation and maintenance manuals (OMMs) as provided by the Design Engineer and the General Contractor. LAE will verify that the number and content of the manuals are complete and accurately reflect the work completed and required by the contract documents. LAE will check that each OMM prepared by the Contractor conforms with the contract documents prior to submittal to the Design Engineer and City for review and comment. LAE will return incomplete and inaccurate documents to the Contractor for correction.

Environmental and Regulatory Agency Compliance
LAE will provide as-needed coordination with the Regional Water Quality Control Board, California Department of Fish and Wildlife, United States Army Corps of Engineers, State Department of Public Health, nearby Cities (if needed), City of Lomita, and City’s Departments and other City staff in management of the construction contract.

Environmental support duties shall include but not be limited to reviewing and commenting on Water Quality Management Plans (WQMP) and Stormwater Pollution Prevention Plans (SWPPP), including the annual reports. LAE will verify the contractor’s compliance by providing inspection to confirm the Contractor is complying with its SWPPP and with storm water regulations.

LAE will provide the level of effort to inspect and monitor the Contractor’s work for commissioning and start-up of all individual systems, as well as overall start-up. This will include coordination of scheduled utility shutdowns, tie-ins, and appurtenant work. LAE will check and inspect to its satisfaction to ensure that all equipment and facilities have been properly installed, calibrated, and are operating for every component of the Project. LAE will coordinate the required hydrostatic pressure testing, leak checks, chlorination and disinfection, flushing, bacteriological testing, and related water activities with the Contractor and City.

Quality Assurance/Quality Control (QA/QC)
LAE’s QA/QC procedures are designed to ensure full compliance with project objectives, contract documents, and applicable standards through a structured, results-driven approach. Prior to construction, the team will conduct a comprehensive review of the Plans, Specifications, and Estimates (PS&E) to identify potential issues, verify constructability, and confirm alignment with funding requirements. A project-specific workplan will be implemented to monitor quality, schedule, and budget concurrently, with proactive measures to address deviations before they impact progress. LAE’s Construction Management systems will track submittals, inspections, and corrective actions in real time, ensuring that all work meets or exceeds the City’s standards, safety requirements, and industry best practices.

EPA Community Grant and Federal Compliance
LAE understands that the Zone G Water Main Replacement Project is supported by federal funding through an EPA Community Grant and must comply with applicable federal environmental, civil-rights, documentation, and reporting requirements. EPA issued a Categorical Exclusion determination for the Lomita Water System Improvements Project on June 27, 2025, pursuant to 40 CFR Section 6.204. LAE will coordinate with the City, design team, contractor, and applicable agencies to ensure that construction remains consistent with the approved project scope, limits of disturbance, environmental findings, grant conditions, and required permits.

The CATEX documentation anticipates minor, temporary, and localized construction effects related to traffic, noise, fugitive dust, equipment emissions, and access. LAE will monitor the contractor’s compliance with approved traffic-control measures, dust suppression, noise restrictions, stormwater BMPs, work-hour limitations, and other applicable environmental controls. LAE will further support the City’s compliance with 40 CFR Parts 5 and 7 and applicable federal nondiscrimination requirements, including Title VI, Title IX, Section 504 of the Rehabilitation Act, the Age Discrimination Act, and Section 13 of the Federal Water Pollution Control Act. Project communications and public-outreach activities will be administered without discrimination, and reasonable accommodations, alternative formats, and language assistance will be provided as directed by the City to ensure meaningful access for persons with disabilities and individuals with limited English proficiency. LAE will maintain organized compliance records and provide the documentation needed to support City reporting, reimbursement, audits, and project closeout.

Figure 8: New Water Line
Tuesday, October 20, 2026 Reg CC MTG, Page *227
Zone G Water Main Replacement Project Page | 20
City of Lomita
LAE is certified by the Port of Long Beach as a Small Business Enterprise (SBE) under NAICS codes 541330, 541611, and 541618, with its current certification valid through December 23, 2028. In support of the EPA Community Grant’s applicable procurement requirements, LAE has conducted good-faith outreach to qualified Disadvantaged Business Enterprise (DBE) firms for potential subcontracting opportunities. Firms contacted include GCAP Services, Inc. for labor compliance monitoring and Title VI support, and AESCo and MTGL for materials testing services. Following this outreach, LAE selected GCAP Services, Inc. to serve as the project’s labor compliance subconsultant. LAE will maintain the applicable outreach and participation records and coordinate with GCAP to support compliance with the project’s federal labor, reporting, and recordkeeping requirements.

Task 3 – Construction Observation/Inspection
LAE's experienced team will conduct thorough field observation and inspection to ensure the project's compliance with the contract documents, regulations, and codes. We will attend field meetings and provide the necessary materials testing service.
 Attend all meetings related to the construction project.  Verify compliance with applicable water-system standards, plans and specifications, and encroachment-permit conditions.
 Observe and inspect trench excavation, pipe bedding, pipe and fitting installation, joint restraint, valves, fire hydrants, water services, utility crossings, backfill, compaction, pressure testing, flushing, disinfection, bacteriological sampling, tie-ins, service transfers, and pavement restoration.
 Track water shutdowns, customer notifications, temporary service arrangements, tie-in windows, and restoration of water service.  Ensure compliance with Americans with Disabilities Act (ADA) and all contract requirements.
 Schedule and coordinate sampling and testing of construction materials.  Receive, verify, initial, and retain delivery tickets for materials.  Record changes made during construction for the preparation of record drawings.
 Report any violations of applicable regulations.
 Maintain a copy of all contract documents and construction-related documents on-site.  Take and maintain project site and construction activity photos for documentation purposes.  Communicate with utility companies and other agencies as necessary.  Prepare Daily Inspection Reports, which will consist of:
 Contractor's working hours on the jobsite.
 Contractor and sub-contractor personnel and equipment on site.  Weather conditions and their impact on the progress of work.  Tasks or instructions given to the contractor.
 Daily use of the contractor and sub-contractor equipment.  Observations relevant to work progress, including deficiencies or contract violations by the contractor.  Delivery of materials to the project site.
 Observed or foreseen delays, their reasons, and the contractor's response.  Review of the Contractor's two-week look-ahead schedule.  Claims, additions, and removals pertaining to contract items.  Visitors who come to the job site with an interest in the project.  Work activities and construction progress.
 Quantities measurements.
 Photographs to document construction progress and activities.

Task 4 – Labor Compliance
LAE will ensure the prime Contractor and Subcontractor(s) submit Certified Payrolls and other related documents in a timely manner. We will review the certified payroll records, interview the Contractor/sub-contractors, and provide reports. Labor Compliance services will be performed by LAE’s subconsultant, GCAP Services.  Ensure proper posting of the appropriate Federal and State Wage Determinations and Federal labor compliance posters on the project sites.

Figure 9: Inspector Observing Water Main
Installation and Trench Operations
Tuesday, October 20, 2026 Reg CC MTG, Page *228
Zone G Water Main Replacement Project Page | 21
City of Lomita
 Attend the pre-construction meetings and ensure the prime contractors and sub-contractors attend the preconstruction meetings, submit Certified Payrolls and other related documents. Review the labor compliance administration and interview process with Contractors and sub-contractors.  Interview contractors/subcontractor(s) workers as required.  Review the Certified Payroll records, fringe benefit statements/other documents, interview forms, daily logs, and compare for accuracy. Prepare reports of any deficiencies.  Request Contractors to turn in back up documents for the contractor, sub-contractors, second tier sub-contractors, and unlisted sub-contractors.
 LAE has provided these services in-house or through GCAP Services, our sub-consultant, for the following Cities:

Arcadia, Azusa, Baldwin Park, Chino (Streets and Water Department), Claremont, Diamond Bar, El Monte, Elsinore Valley Municipal Water District, Laguna Niguel, Lomita, Montclair, Perris, Pomona, San Dimas, Seal Beach, Signal Hill, Western Municipal Water District, and Yorba Linda.

Task 5 – Materials Sampling/Testing
Materials Sampling/Testing (Optional) will be provided by Geo-Advantec, Inc. (GAI) of San Dimas. GAI with Caltrans Certified Laboratory and Technicians will provide the required Geo-technical and Quality Assurance/Quality Control (QA/QC) services. GAI has assisted the following LAE clients with similar projects since 2016: Arcadia, Azusa, Chino, Compton, El Monte, Lomita, and Montclair. GAI will provide the required Materials Testing services for the project in accordance with the contract documents. GAI provides a full range of responsive and quality geotechnical engineering, materials testing, and inspection services for all project phases. GAI currently has a team of about twenty (20) registered civil and geotechnical engineers, geologists, field and laboratory technicians, and special soil inspectors with a wide range of skills on roadway, transportation as well as pavement rehabilitation projects. They will provide field testing of subgrade, aggregate base, and asphalt pavements. GAI will also provide soil base materials, asphalt concrete, rubberized asphalt, concrete, and other laboratory testing of the construction materials in accordance with the City’s contract document requirements. They will also provide sampling, observation, and testing for federally funded projects in accordance with City’s Caltrans approved QAP. They will prepare and submit test results daily to construction management teams. As part of their services, they will provide materials testing management and engineering support, as needed.

Task 6 – Utility and Outside Agency Coordination
LAE will coordinate closely with all affected utilities, City departments, emergency services, and waste management providers to prevent service disruptions and keep the project on schedule. Our team will review the scope with each utility, resolve conflicts promptly, and manage any required relocations. We will also support the City’s public outreach efforts, with Grace Alvarez providing Spanish translation as needed to ensure effective communication with all residents. To achieve this, LAE will:
 Notify utilities, emergency services, and waste providers before construction and engage them in the pre-construction meeting.  Review project scope with each utility, address conflicts, and expedite relocation work if needed.
 Resolve unforeseen utility conflicts quickly during construction.  Provide Spanish translation and assist with resident communications to address concerns, if requested.

Task 7 – Project Closeout/Post-Construction
We will schedule a final walkthrough with involved parties. A punch list will be prepared throughout construction and finalized after the final walkthrough, defining items needing attention. The As-Built drawings will be finalized for record Drawing preparation. Upon completion of the punch list items and acceptance of the project by the City, applicable City staff, and impacted utilities, LAE will compile and provide the project files to the City in both electronic and hard-copy formats, as requested by the City. LAE will also collect applicable O&M manuals and provide them to the City. Contract closeout will include project handover to the City and demobilization of the Contractor and CM team.

Figure 11: Public Notice for Upcoming
Construction Activities
Figure 10: Asphalt Density Testing
Tuesday, October 20, 2026 Reg CC MTG, Page *229
Q

FEE PROPOSAL
Tuesday, October 20, 2026 Reg CC MTG, Page *230
Zone G Water Main Replacement Project Page | 22
City of Lomita

FEE PROPOSAL
A fee schedule/fee proposal has been submitted in a separate document.

Tuesday, October 20, 2026 Reg CC MTG, Page *231
LAE Associates, Inc.

Project, Construction & Program Management
Proposal for
Construction Management, Construction Inspection, Labor Compliance, and Material Testing services for
STREET RECONSTRUCTION PROJECT – ZONE G
(PHASES 3 & 4)
Date: September 9, 2026
Prepared for

CITY OF LOMITA
Contact Information
1050 E. Yorba Linda Blvd., Unit 201
Placentia, CA 92870
Tel: 714.993.2840
LAEassociates.com
Exhibit A.2
Tuesday, October 20, 2026 Reg CC MTG, Page *232
Street Reconstruction Project – Zone G (Phases 3 & 4) i City of Lomita

TABLE OF CONTENTS
COVER LETTER .................................................................................................................................................................... 1 FIRM’S OVERVIEW ................................................................................................................................................................ 2 Qualifications ....................................................................................................................................................................... 2 QUALIFICATION AND EXPERIENCE ................................................................................................................................... 3 Key Personnel ..................................................................................................................................................................... 3 Organization Chart .............................................................................................................................................................. 3 Staff Qualifications and Experience .................................................................................................................................... 3 Resumes ............................................................................................................................................................................. 7 Team’s Availability ............................................................................................................................................................... 7 Firm Experience .................................................................................................................................................................. 8 SCOPE OF WORK AND PROJECT APPROACH ............................................................................................................... 11 Understanding the Need ................................................................................................................................................... 11 Scope of Work and Project Approach ............................................................................................................................... 15 FEE PROPOSAL .................................................................................................................................................................. 21 Tuesday, October 20, 2026 Reg CC MTG, Page *233
Page | 1
q

COVER LETTER
Tuesday, October 20, 2026 Reg CC MTG, Page *234
1050 E. Yorba Linda Blvd., Unit 201, Placentia, CA 92870 (714) 993-2840
LAEassociates.com1
Page | 1
Associates, Inc.

COVER LETTER
September 9, 2026
Ms. Deanna Fraley, P.E.

Public Works Director
Public Works Department
City of Lomita
24300 Narbonne Avenue
Lomita, CA 90717
Attention: Jennifer Howell, P.E., Associate Engineer
SUBJECT: PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT, CONSTRUCTION INSPECTION, LABOR COMPLIANCE, AND MATERIAL TESTING SERVICES FOR STREET RECONSTRUCTION PROJECT – ZONE G (PHASES 3 & 4)
Dear Ms. Fraley,
Local Agency Engineering Associates, Inc., doing business as (DBA) LAE Associates, Inc. (LAE) is pleased to have the opportunity to submit our proposal to the City of Lomita (City) to provide Construction Management, Construction Inspection, Labor Compliance and Material Testing Services. Our services will be for the following project:
 Street Reconstruction Project – Zone G (Phases 3 & 4) Our firm specializes in Construction Management, Project and Program Management, Construction Inspection, and Other Municipal Services for public agencies. We have served as an on-call consultant to the City for the past eight (8) years, since 2018, delivering multiple successful projects across various disciplines.

Recently, we have completed the Construction Management and Construction Observation/Inspection of the Street Reconstruction Zone G – Phase 1 Project.

The assembled team designated to provide the requested services has a vast range of experience working with public agencies and specifically with street rehabilitation and reconstruction projects. LAE will assign Mr. Kevin Alamolhoda, P.E., Construction Manager [over ten (10) years of Public Works Engineering experience with LAE] as the Construction Manager along with support staff. LAE will assign one of the following Construction Observers/Inspectors as the prime Construction Observer/Inspector and the others as alternate/back-up Construction Observers/ Inspectors: Marco Zamora, Ned Shaffer, Mamoun Aldwir, and Jesse Di Stefano [each has over twenty (20) years of construction experience]. These key members have the required CM&I experience needed to manage and observe the subject project. Our sub-consultants will include GCAP Services, Inc. for Labor Compliance Services and Geo-Advantec, Inc. for Geotechnical and Material Testing Services.

Thank you for providing LAE with an avenue to be of service to the City. I, Fred Alamolhoda, Municipal Engineering Director of LAE, am authorized to sign contracts for LAE. The information submitted in this proposal is true and correct to the best of my knowledge. Please feel free to contact me regarding this proposal at 714- 993-2840 or [email protected].

Sincerely,
Fred Alamolhoda, P.E.

Municipal Engineering Director
Tuesday, October 20, 2026 Reg CC MTG, Page *235
Page | 1
FIRM’S OVERVIEW
Tuesday, October 20, 2026 Reg CC MTG, Page *236
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 2 City of Lomita
FIRM’S OVERVIEW
LAE Associates, Inc. (LAE) is an S-Corporation that provides professional public works and engineering services to public agencies across Southern California, with the main objective of improving the communities we live in and ensuring the satisfaction of our clients. In 2007, LAE, was founded on the premise of enhancing the processes, outcomes, and nature of municipal projects. LAE has one primary mid-sized office at 1050 E. Yorba Linda Blvd., Unit 201, Placentia, CA 92870 and twenty (20) employees.

Key Services
LAE specializes in Project, Construction, and
Program Management services for public
agencies. In addition, LAE’s services include
Construction Observation and Inspection, Water
District and City Services, Staff Augmentation/
Mentorship, Capital Project Planning, and
Transportation Funding Strategies to individual
Cities, Counties, Councils of Governments, and
other Public Agencies.

Qualifications
LAE has a demonstrated history of providing
Project/Program/Construction Management, Staff Augmentation, Project Planning, and Inspection to Cities, Water Districts, and other Public Agencies. Additionally, LAE has provided Geo-technical and Labor Compliance Services through its subconsultants. LAE teams have been working very closely with Cities, Counties, Caltrans, Water Districts, SBCTA, CVAG, and other public agencies. We are the on-call consultant for several agencies, assisting them in times of urgency as well as year-round on a variety of Public Works projects. We have served as an on-call consultant to the City of Lomita for the past eight (8) years, since 2018, delivering multiple successful projects across various disciplines. LAE’s extensive experience includes successfully delivering projects and/or being on-call for various cities and municipalities, including:
 City of Anaheim
 City of Arcadia
 City of Azusa
 City of Cerritos
 City of Chino
 City of Claremont
 City of Compton
 City of Diamond Bar
 City of Rosemead
 City of Eastvale
 City of El Monte
 City of Fontana
 City of La Mirada
 City of Laguna
Beach
 City of Lawndale
 City of Lomita
 City of Manhattan Beach
 City of Montclair
 City of Norwalk
 City of Pomona
 City of Rancho
Cucamonga
 City of San Bernardino
 City of San Dimas
 City of Seal Beach
 City of Tustin
 City of Ventura
 City of Yorba
Linda
 EVMWD
 Western Water
Having familiarity with the area allows us to provide our services in a time-effective and efficient manner with high caliber outcomes. LAE’s employees bring extensive public- and private-sector experience and understand the complexities associated with the services and requirements of this task order. The management of the firm has approximately forty (40) years of Public Works experience, having been employed with several cities and Caltrans on relevant practices. The LAE team have been successful in their efforts due to their high quality and timely project delivery, experienced staff, loyal clients, and reputable project partners. LAE consists of a diverse group of experienced professionals who provide exceptional services to its clients. We are committed to delivering quality work, and our success is reflected in the long-term relationships we have built with our clients. Our team is comprised of talented individuals who are based in various locations, allowing us to serve clients across different geographic areas. We have a team of professionals who are local and experienced in the specific needs of this community. Our staff is flexible and able to travel to project or City locations. Proposed staff will be responsible for executing professional proposed services from either the LAE office or one of the City’s offices, ensuring we provide the best possible service to our clients.

We are familiar with the entire project development process, from conception to construction completion, and know how to obtain desirable results for the City. We have been able to streamline this process for our clients with a series of established methods and rapport developed with participating agencies. With the use of schedules, we can track the progress of projects and actively manage potential upcoming conflicts. Staffing needs will also be projected with the use of such systems. Critical tasks and milestones will clearly be identified, with dates shown to visualize when submittals need to be received, construction activities are to be completed, and meetings are to be conducted. Further details of our key issue management approach are discussed in this Proposal.

Tuesday, October 20, 2026 Reg CC MTG, Page *237
Q

QUALIFICATION AND EXPERIENCE
Tuesday, October 20, 2026 Reg CC MTG, Page *238
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 3 City of Lomita

QUALIFICATION AND EXPERIENCE
Key Personnel
The LAE team is a group of highly experienced personnel who have in-depth knowledge of Engineering and CIP projects, from conception to completion. Our proposed teams possess practical, relevant, and quality experience on projects with nearly the same Scope of Services. We are equipped to bring our familiarity and know-how to the City and be of contribution to the project.

Organization Chart
Staff Qualifications and Experience
Project/Construction Managers
Mr. Alamolhoda has over ten (10) years of professional experience working for LAE Associates, Inc. and the Los Angeles County Department of Public Works. He has worked closely with Project/Program Managers, Construction Managers, and Construction Observers on a variety of Public Works Engineering Projects. He interacts regularly with client cities, public Kevin Alamolhoda, P.E.

Project/Contract
Manager, LAE
Education
 MBA
 B.S. in Civil Engineering
Years of Experience
12 years
Years with LAE
10 years
License No.
92855
Tuesday, October 20, 2026 Reg CC MTG, Page *239
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 4 City of Lomita
agencies, consultants, and contractors, and has provided both in-person and virtual PM/CM staff augmentation for multiple client cities. His experience includes multiple transportation and underground utility projects.

Experience
Aboveground Projects
 Removal and Replacement of Southern California Edison (SCE) owned Street Lights Poles/Fixtures – City of Arcadia  Traffic Signal Modification Ramona Avenue and Schaefer Avenue Project – City of Chino  Edison Avenue Traffic Signal Upgrade Project – City of Chino  Arrow Highway Transit Improvements, First Street Pavement Rehabilitation, and Indian Hill Boulevard I-10 Street Improvements Project – City of Claremont
 Claremont Boulevard and Monte Vista Avenue Accessibility Project – City of Claremont  City Wide Street Resurfacing Project – City of Claremont  College Avenue Pedestrian and Bike Improvements Project – City of Claremont  Central Avenue Pavement Rehabilitation Project – City of Compton  Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement Project – City of Compton  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Parking Lot and Street Improvements – Elsinore Valley Municipal Water District  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Street Reconstruction Zone G – Phase 1 Project – City of Lomita  Manhattan Beach Boulevard Eastbound Left-Turn Improvements at Aviation Boulevard Project – City of Manhattan Beach
 Fiscal Year 25 – 26 Local Slurry Seal Pavement Rehabilitation – City of Rancho Cucamonga  Fiscal Year 25 – 26 Annual Pavement Preservation Project (APPP) – Zone 7B – City of Yorba Linda Construction Observers/Inspectors
Mr. Zamora has over twenty (20) years of construction experience specializing in public works inspection, code compliance, plan review, right-of-way and encroachment permits, utility coordination, traffic control, and construction documentation. His experience includes water, roadway, drainage, concrete and asphalt improvements, sidewalks, curb and gutter, storm drains, MEP systems, and other municipal infrastructure. He coordinates effectively with contractors, engineers, utility companies, and City staff while ensuring compliance with plans, specifications, permits, and applicable federal, state, and municipal requirements. He has worked on projects involving major roadway reconstruction, including base repairs, asphalt pavement placement, concrete and accessibility improvements, and appurtenant work items.

Experience
Above Ground Projects
 Citywide Road Reconstruction Project, from Aliso Viejo Parkway to Enterprise Street – City of Aliso Viejo  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  FY 2024/25 Street Rehabilitation & FY 2025/26 Sidewalk Replacement Projects – City of Lawndale Mr. Shaffer has over forty (40) years of experience in the construction industry, including thirty-six (36) years with Golden State Water Company (GSWC). He has provided inspection services for roadway rehabilitation, reconstruction, slurry seal improvements, public facility, and concrete improvement construction projects for various Southern California cities, supporting quality control, compliance, and successful project delivery. He was responsible for inspecting, monitoring, installing, maintaining, and repairing water system infrastructure for GSWC and its member agencies. His experience Years of Experience
40 years
Years with LAE
5 years
Marco A. Zamora
Construction
Observer/Inspector, LAE
Education
 A.S. and A.A., Santiago Canyon Clg.  Building Inspection Technology, Coastline Community College
Key Skills
Construction Inspection
& Utility Coordination
Years of Experience
20 years
Years with LAE
Approx. 1 year
Ned Shaffer
Construction
Observer/Inspector, LAE
Training Courses
 Safety Training, OSHA (trenches
safety), Water Pressure Check,
Inspection, Fire Safety, Asbestos
Abatement Training
Key Skills
Construction Inspection
& Utility Coordination
Years of Experience
40 years
Years with LAE
4 years
Tuesday, October 20, 2026 Reg CC MTG, Page *240
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 5 City of Lomita
includes construction inspection, utility coordination, water main installation and replacement, service connections, valves, hydrants, trench repair, concrete work, and pavement restoration.

Experience
Above Ground Projects
 Downtown Alley Improvement Project – City of Arcadia
 Area 3 Residential and Collector Streets Rehabilitation & Arterial Street Rehabilitation Project – City of Diamond Bar  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Various Encroachment Permit Projects – City of El Monte  Neighborhood Slurry Seal Area 5 Project – City of La Mirada  Slurry Seal of Imperial Highway Project – City of La Mirada  Slurry Seal of Imperial Highway from Wicker Drive to East City Limits, and Artesia Boulevard from Valley View Avenue to Knott Avenue – City of La Mirada
 Street Reconstruction for Various Streets in Zones C&F Project – City of Lomita  Dog Park at Garvey Park Project – City of Rosemead
Mr. Aldwir has over thirty-three (33) years of experience in Public Works Engineering, having worked for the City of Placentia as well as private consulting firms (retired as a Public Works Inspector from the City of Placentia). His experience includes Public Works Inspection/Construction Observation (CO), and field and office engineering for both new street improvements and existing roadway infrastructure. This includes curbs, gutters, curb ramps, driveway approaches, storm drain facilities, sub-base/base materials, Full Depth Reclamation (FDR), grind and overlay, Asphalt Rubber Hot Mix (ARHM), Portland Cement Concrete (PCC) pavement, petromat, and signage/striping. He has also worked on sewer and waterline projects, parks, land development, irrigation and landscaping, and underground facility installation projects. He has extensive experience ensuring compliance with contract documents, state laws, local ordinances, NPDES standards, and traffic control requirements.

Experience
Above Ground Projects
 Area 3 Residential and Collector Streets Rehabilitation and Arterial Street Rehabilitation - City of Diamond Bar  Diamond Bar Boulevard Complete Streets Project – City of Diamond  Maple Hill Park Improvements Project – City of Diamond Bar  Phase I of Street Pavement Resurfacing – City of El Monte  Phase II of the Slurry Seal/Overlay Project – City of El Monte  Parking Lot and Street Improvements – Elsinore Valley Municipal Water District  Neighborhood Slurry Seal Area 3 – City of La Mirada
 Phase 6A Residential Street Rehabilitation – City of La Mirada  Valley View Avenue Pavement Rehabilitation from Imperial Highway to Rosecrans Avenue Project – City of La Mirada  Street Reconstruction for Various Streets in Zones C&F – City of Lomita Construction Support Staff
Ms. Palacios is a highly skilled Civil Engineering Professional with proficiency in AutoCAD, Q-Gis, OSPI, O-calc, and Microsoft Suite. She excels in forecasting, reviewing, and actualizing construction projects, consistently delivering them on time and within budget. Ms. Palacios plays a key role in supporting Project/Construction Management efforts, providing office engineering services, and ensuring seamless coordination between teams for successful project execution. She has experience in coordinating construction drawings, managing relationships with A&E vendors, and designing fiber routes.

Melissa Palacios
Office Engineer,
LAE
Education
 B.S. in Civil Engineering
Key Skills
Project
Coordination
Years of Experience
3 years
Years with LAE
2 years
Mamoun Aldwir
Senior Construction
Observer/Inspector, LAE
Education
 A.A. in Civil Engineering
Years of Experience
33 years
Years with LAE
7 years
Key Skills
Construction Inspection
& Utility Coordination
Tuesday, October 20, 2026 Reg CC MTG, Page *241
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 6 City of Lomita
Her previous experience included overseeing splicing and construction for numerous fiber and utility projects sites, managing complex project timelines, and ensuring compliance with regulatory standards. She has worked on Capital Improvement Program (CIP) and infrastructure projects such as Street Improvement, Water Replacement, and Traffic Signal Projects.

Experience
Above Ground Projects
 City Wide Street Resurfacing Project – City of Claremont  College Avenue Pedestrian and Bike Improvements Project – City of Claremont  Arrow Highway Transit Improvements, First Street Pavement Rehabilitation, and Indian Hill Boulevard I-10 Street Improvements Project – City of Claremont
 College Avenue Pedestrian and Bike Improvements Project – City of Claremont  Area 3 Residential and Collector Streets Rehabilitation and Arterial Street Rehabilitation Project – City of Diamond Bar
 Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Parking Lot and Street Improvements – Elsinore Valley Municipal Water District  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Street Reconstruction Zone G – Phase 1 Project – City of Lomita  Neighborhood Slurry Seal Area 5 Project – City of La Mirada  Slurry Seal of Imperial Highway Project – City of La Mirada  Manhattan Beach Boulevard Eastbound Left-Turn Improvements at Aviation Boulevard Project – City of Manhattan Beach
 Fiscal Year 25 – 26 Local Slurry Seal Pavement Rehabilitation – City of Rancho Cucamonga  Fiscal Year 25–26 Annual Pavement Preservation Project (APPP) – City of Yorba Linda Mr. Parkin is a Junior Engineer with a Civil Engineering educational background, bringing the latest knowledge in the field.

He supports Project Managers, Construction Managers, Construction Inspectors, and Civil Engineering personnel with dayto-day operations. His experience includes preparing Working Day Reports and Weekly Statements of Working Days, reviewing Public Works Engineering plans and specifications, and formatting inspection reports and bid documents. He brings strong analytical abilities, proficiency with modern engineering tools, and quickly adapts to new processes and field environments. His responsibilities also include maintaining project records and assisting with coordination between field and office teams. He has gained exposure to field operations, documentation, and public works standards. Representative assignments include transit, pavement rehabilitation, complete streets, slurry seal, and intersection improvements for the Cities of Claremont, Diamond Bar, Fontana, La Mirada, Manhattan Beach, and Rancho Cucamonga, as well as water main replacement work for Western Municipal Water District and sewer line replacement for the City of Rancho Cucamonga.

Experience
Above Ground Projects
 Arrow Highway Transit Improvements, First Street Pavement Rehabilitation, and Indian Hill Boulevard I-10 Street Improvements Project – City of Claremont
 Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Manhattan Beach Boulevard Eastbound Left-Turn Improvements at Aviation Boulevard Project – City of Manhattan Beach
 Fiscal Year 25 – 26 Local Slurry Seal Pavement Rehabilitation – City of Rancho Cucamonga  Fiscal Year 25–26 Annual Pavement Preservation Project (APPP) – City of Yorba Linda Sub-Consultants
Jacob Parkin
Junior Engineer,
LAE
Education
 B.S. in Civil Engineering
Key Skills
Project
Coordination
Years of Experience
Approx. 1 year
Years with LAE
Approx. 1 year
Tuesday, October 20, 2026 Reg CC MTG, Page *242
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 7 City of Lomita
LAE has included Geo-Advantec, Inc. for Geotechnical and Materials Testing Services and GCAP Services, Inc. (GCAP) for Labor Compliance Services as our sub-consultants on an as-needed basis to support specific project requirements.

Sylvia Linn has over seventeen (17) years of experience in compliance and assessment-related services. She leads labor compliance practices and provides clients with audit, assessment, and studyrelated support. She has extensive experience delivering both California and federal prevailing wage consulting services, and she routinely leads audits and studies, conducting analytical reviews of existing practices, and developing best practices and
recommendations to improve procedures and processes. Since 2014, GCAP Services, under her leadership, has provided DBE and Labor Compliance services to LAE projects in the cities of Arcadia, Azusa, Baldwin Park, Brea, Chino, Claremont, Compton, CVAG, Diamond Bar, El Monte, Elsinore Valley Municipal Water District, Fontana, Laguna Niguel, Lomita, Manhattan Beach, Montclair, Norwalk, Perris, Pomona, San Dimas, Seal Beach, Signal Hill, Ventura, and Western Municipal Water District.

Projects with LAE
Above Ground Projects
 Gold Line Station Pedestrian Linkage Project – City of Arcadia  Foothill Boulevard and Palm Drive Traffic Signal Project (Federal Project) – City of Azusa  Central Avenue Pavement Rehabilitation Project – City of Compton  Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement Project – City of Compton  Phase I of Street Pavement Resurfacing – City of El Monte  Phase II of the Slurry Seal/Overlay Project – City of El Monte  Parking Lot and Street Improvements – Elsinore Valley Municipal Water District  Citrus Avenue at Ceres Avenue Traffic Signal Project – City of Fontana  Building a Better-Connected Inland Empire (Raise Grant) Project Along Cherry Avenue from Baseline Avenue to State Route 210 (Sr-210) Freeway and Victoria Avenue from Cherry Avenue to Kestral Avenue – City of Fontana  Crown Valley Parkway Pavement Rehabilitation Project – City of Laguna Niguel  Street Reconstruction for Various Streets in Zones C&F – City of Lomita  Street Reconstruction Zone G – Phase 1 Project – City of Lomita Shawn Ariannia of GAI will be assigned as the Geotechnical Engineer for the project. Mr. Ariannia and his geotechnical team bring unique knowledge, expertise, and recent experience in Geotechnical Engineering, Pavement Engineering (including Cold Central Plant Recycling, Full Depth Reclamation, ARHM paving and processes), and laboratory testing of soil. Mr. Ariannia and his team will be available to support the City’s Task Orders and fulfill all contract requirements.

Since 2016, GAI has provided Geotechnical and Material Testing Services to LAE’s projects in the cities of Arcadia, Azusa, Chino, Compton, El Monte, Lomita, and Montclair.

Projects with LAE
 Gold Line Station Pedestrian Linkage Project – City of Arcadia  Foothill Boulevard and Palm Drive Traffic Signal Project (Federal Project) – City of Azusa  Central Avenue Pavement Rehabilitation Project – City of Compton  Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement Project – City of Compton  Diamond Bar Boulevard Complete Streets Project – City of Diamond Bar  Crown Valley Parkway Pavement Rehabilitation Project – City of Laguna Niguel  Street Reconstruction for Various Streets in Zones C&F – City of Lomita  Street Reconstruction Zone G – Phase 1 Project – City of Lomita  2nd Stage of Construction of the Local Streets Rehabilitation Paving Improvements – City of Norwalk Resumes
Detailed resumes can be found in the Appendix Section of LAE’s On-Call CM and Inspection Services proposal to the City.

Team’s Availability
Sylvia Linn
Labor Compliance Manager, GCAP Services
Education
J.D., M.B.A.

Years of Experience
17 years
Shawn Ariannia, Ph.D., P.E., G.E.

President/Principal, Geo-Advantec, Inc. (GAI)
Education
Ph.D. in Geotechnical Engineering
M.S. in Civil Engineering
B.S. in Civil Engineering
Tuesday, October 20, 2026 Reg CC MTG, Page *243
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 8 City of Lomita
LAE’s Construction Management and Inspection team along with our selected sub-consultants are fully available and committed to making this project a success. Our team is ready to dedicate the necessary resources, managing our workload efficiently to prioritize this project. With our expertise and reliable partnership, we'll ensure timely delivery and exceed expectations.

Key personnel will be available to the extent proposed for the duration of the required services and no person designated as “key” shall be removed or replaced without prior written concurrence of the City. The following table presents the estimated percentage of each team member’s availability that will be dedicated to this project.

Name Title Availability/Expected
Contribution
Project/Construction Managers
Kevin Alamolhoda, P.E. Senior Project/Construction Manager, LAE 75% Construction Management Support Staff
Melissa Palacios Assistant Construction Manager/Office Engineer, LAE 85% Jacob Parkin Junior Engineer, LAE 85%
Construction Observers/Inspectors
Marco Zamora Construction Observer/Inspector, LAE 100%
Ned Shaffer Construction Observer/Inspector, LAE 100%
Mamoun Aldwir Construction Observer/Inspector, LAE 100% Jesse Di Stefano Construction Observer/Inspector, LAE 100% Sub-Consultants
GCAP Services (DBE Firm) Labor Compliance Sub-Consultant, GCAP 100% Geo-Advantec, Inc. Material Testing Sub-Consultant, GAI 100% Our team has the capacity and resources to fully support this project without impacting performance, ensuring timely coverage, communication, and responsiveness.

Firm Experience
LAE is exceptionally well-suited to provide Construction Management and Inspection services for the City of Lomita because of our direct experience supporting the City and our extensive background managing and inspecting municipal public works and capital improvement projects throughout Southern California. LAE has provided services on multiple City of Lomita infrastructure assignments including the FY 2019/2020 Street Improvement Program, Street Reconstruction Zone G – Phase 1 Project, Street Reconstruction for Various Streets in Zones C&F, 247th Street Area Water Main Replacement Project, and Walnut Street Water Main Replacement, which involved construction management, construction observation/inspection, materials testing, labor compliance, pavement rehabilitation, ADA curb ramp upgrades, utility adjustments, striping, markings, and coordination with City requirements. This prior experience gives LAE a strong understanding of City’s infrastructure priorities, street network, construction conditions, documentation expectations, and public works delivery needs.

Previous Experience/Projects with City
FY 2019/2020 Street Improvement Program Project
Client: City of Lomita
Duration: September 2020 to November 2020
Description: The work included the removal of existing thermoplastic and painted striping, pavement markings, and legends; removal of raised pavement markers; application of bituminous pavement crack sealant; application of skin patch/level course; application of chip seal; and application of slurry seal in designated areas. The project also included the installation of new striping, pavement markings, legends, and raised pavement markers. Additional tasks included sweeping before and after slurry seal applications, removal of grease spots by grinding, traffic control, protection of all utility covers in place, and installation of temporary pavement markers.

Project Funding Type: Local Funds
Tuesday, October 20, 2026 Reg CC MTG, Page *244
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 9 City of Lomita
Construction Cost: $500,000
LAE’s Duties: Construction Management, Construction Observation/Inspection, and Materials Testing Services Street Reconstruction Zone G – Phase 1 Project
Client: City of Lomita
Duration: October 2024 to October 2025
Description: The project involved traffic control, clearing and grubbing, removal and construction of 4-inch PCC sidewalk, 8-inch PCC cross gutter, variable height 5-inch to 7.5-inch curb and gutter, and PCC curb ramps. Work also included construction of PCC retaining curb, removal of 26,640 CY of the entire pavement section and base, construction of 2,565 tons of asphalt concrete and 1,370 CY of crushed aggregate base. Additional tasks included adjustment of sewer and storm drain manhole frames and covers to grade, adjustment of water and gas valve boxes and covers to grade, and removal and installation of striping, markings, legends, reflectors, and raised pavement markers.

Project Funding Type: Local Street Fund
Construction Cost: $1.6 million
LAE’s Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance Services
Street Reconstruction for Various Streets in Zones C&F
Client: City of Lomita
Duration: April 2022 to October 2022
Description: The work generally consisted of furnishing all labor, materials, tools, equipment, and incidentals necessary to rehabilitate the pavement on various streets in Zones C&F, and to upgrade all curb ramps to current ADA standards, as specified in the specifications and Special Provisions, and as directed by the Engineer. The work included over 1,000 SF of sidewalk construction, the removal and construction of 2,450 SF of cross gutter, approximately 700 LF of curb and gutter, and 35 curb ramps. It also included over 200,000 SF of cold milling and grinding, over 7,000 tons of AC, ARHM, and AC base course, and the adjustment of 54 manholes and 56 water valves.

Funding Type: Various Local Funds
Construction Costs: $2.25 million
LAE Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance 247th Street Area Water Main Replacement Project
Client: City of Lomita
Duration: June 2024 to On-Going
Description: The project involved traffic control and the installation of 3,920 LF of 8-inch PVC pipe, 18 gate valves, 3 fire hydrants, 24 water service replacements, 10,295 SF of asphalt pavement base course, 129 tons of asphalt pavement cap, 795 SF of PCC bus pad, and 18 traffic signal loop detectors.

Project Funding Type: FEMA Hazard Mitigation Grant, Local Water Fund Construction Cost: $1.3 million
LAE’s Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance Walnut Street Water Main Replacement (On-Call CM&I)
Client: City of Lomita
Duration: June 2019 to February 2020
Description: The work included approximately 1,800 LF of 4”, 6”, and 8” C900 DR 14 and 18 water main replacements, installation of 22 gate valves (4”, 6”, and 8”), and 27 water services (1”, 2”, 3”, and 4”). It also included the removal and replacement of 4 fire hydrants, application of approximately 400 SY of AC pavement base, and removal and construction of about 2,200 SF of cross gutters and nearly 800 LF of curb and gutter. The project further included 10,300 SY of cold milling and placement of over 1,000 tons of asphalt concrete (AC) and asphalt rubber hot mix (ARHM).

Funding Type: Various Street and Water Funds
Construction Cost: $1.6 million
LAE Duties: Construction Management, Construction Observation/Inspection, Materials Testing, and Labor Compliance Previous Experience/Projects with Other Cities and Agencies Beyond our direct experience with the City, LAE has delivered municipal construction management and inspection services for roadway, ADA, drainage, water, utility, park, and public facility improvements. Our expertise in inspection, contract administration, labor compliance, materials testing, schedule and cost control, utility coordination, public outreach, and closeout enables us to serve as a responsive extension of City staff and deliver projects safely, efficiently, and in accordance Tuesday, October 20, 2026 Reg CC MTG, Page *245
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 10 City of Lomita
with quality, schedule, and budget objectives. Below is a summary of LAE’s relevant projects completed for other cities and municipal agencies.

Above Ground Projects
Client Project Name Duration Project Cost
City of Arcadia Bicycle Facilities Improvement Project Aug 2020 to Mar 2022 $1.05 million City of Arcadia Downtown Alley Rehabilitation Project Nov 2023 to April 2024 $1,940,000 City of Arcadia Gold Line Station Pedestrian Linkage Project Jan 2018 to June 2022 $2,379,000 City of Arcadia Removal and Replacement of Southern California Edison (SCE) owned Street Lights Poles/Fixtures
2018 to 2020 $4 million
City of Azusa Foothill Blvd. and Palm Dr. Traffic Signal Project (Federal Project) Jan 2018 to Dec 2018 $260,000 City of Chino Traffic Signal Modification at Ramona Ave. and Schaefer Ave. June 2020 to June 2022 $500,000 City of Chino Edison Avenue Traffic Signal Upgrade Project Nov 2019 to Nov 2022 $1,700,000 City of Claremont Arrow Hwy. Transit Improvements, First St. Pavement Rehabilitation, and Indian Hill Blvd. I-10 St. Improvements Project Apr 2025 to On-Going $1.5 million
City of Claremont City Wide Street Resurfacing Project Aug 2024 to June 2025 $1.9 million City of Claremont Claremont Boulevard and Monte Vista Avenue Accessibility Sep 2022 to Jan 2023 $700,000 City of Claremont College Avenue Pedestrian & Bike Improvements Feb 2023 to Aug 2024 $990,000 City of Compton Central Avenue Pavement Rehabilitation Project April 2016 to Dec 2016 $1.75 million City of Compton Wilmington Ave. Safe Streets Pedestrian/Bike Improvement Project Oct 2016 to June 2017 $1,219,750 City of Diamond Bar Area 3 Residential and Collector Streets Rehab. Arterial St. Rehab. April 2024 to Oct 2024 $9,369,000 City of Diamond Bar Diamond Bar Boulevard Complete Streets Project May 2024 to On-Going $8,800,000 City of Diamond Bar Maple Hill Park Improvements Project Sep 2024 to On-Going $1.7 million City of Diamond Bar Multiple Major/Regional and Land Development Projects Feb 2019 to May 2020 Multi-Million Dollars
City of El Monte Clora Place and Schmidt Road Street Improvement Project Mar 2024 to Oct 2024 $820,000 City of El Monte El Monte Bike Blvd. and Pavement Rehab. Improvement Project July 2021 to Oct 2021 $960,000 City of El Monte Phase I of Street Pavement Resurfacing Jan 2020 to May 2020 $3.5 million City of El Monte Phase II of the Slurry Seal/Overlay Project May 2020 to Dec 2020 $3.5 million EVMWD Parking Lot and Street Improvements Aug 2023 to Oct 2024 $1,100,000 City of Fontana Citrus Avenue at Ceres Avenue Traffic Signal Project Mar 2023 to May 2023 $700,000 City of La Mirada Neighborhood Slurry Seal Area 3 Aug 2022 to Jan 2023 $850,000 City of La Mirada Neighborhood Slurry Seal Area 5 Project Oct 2024 to Jan 2025 $920,000 City of La Mirada Phase 6A Residential Street Rehabilitation April 2021 to Dec 2021 $4.5 million City of La Mirada Slurry Seal of Imperial Highway from Wicker Drive to East City Limits, and Artesia Blvd. from Valley View Ave. to Knott Avenue Oct 2024 to On-Going $670,000
City of Laguna Niguel Crown Valley Parkway Pavement Rehabilitation Project June 2018 to Dec 2018 $1,600,000 City of Manhattan
Beach
Manhattan Beach Boulevard Eastbound Left-Turn Improvements at Aviation Boulevard Project
Oct 2024 to On-Going $550,000
City of Norwalk 2nd Stage of the Local Streets Rehabilitation Paving Improvements (Zones 24, 27, and 32)
June 2021 to Nov 2021 $2.8 million
City of Rosemead Dog Park at Garvey Park July 2022 to Feb 2023 $640,000 City of San Dimas Various Development Projects and Permit Closures July 2017 to Sep 2019 Various City of San Dimas Removal/Replacement of SCE Owned/Operated Street Light Poles/Fixtures
Aug 2017 to Oct 2017 $2 million
Tuesday, October 20, 2026 Reg CC MTG, Page *246

SCOPE OF WORK AND PROJECT APPROACH
Tuesday, October 20, 2026 Reg CC MTG, Page *247
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 11 City of Lomita

SCOPE OF WORK AND PROJECT APPROACH
Understanding the Need
LAE understands that the City of Lomita is seeking a qualified firm to provide Construction Management, Construction Inspection, Labor Compliance, and Materials Testing services for the Street Reconstruction Project – Zone G Phases 3 &

4. The project is currently at the 90% design stage, is anticipated to be advertised for construction by October 9, 2026, or sooner, and has an estimated construction duration of 100 working days.

LAE understands that the City is undertaking this project to address deteriorated pavement, protect its long-term infrastructure investment, improve roadway safety and ride quality, enhance pedestrian accessibility, and reduce future maintenance needs throughout Zone G. Based on the provided plans, the work includes asphalt concrete overlays, full pavement-section reconstruction, ADA curb ramps and curb extensions, concrete and hardscape repairs, fire hydrant improvements, utility adjustments, and signing and striping. Collectively, these improvements will provide safer, smoother, more accessible, and visually improved streets for residents and the traveling public.

The project includes improvements along portions of the following roadways:
 247th Place
 252nd Street
 Ebony Lane
 Alcor Street
 Walnut Street
 254th Street
 Doria Avenue
 255th Street
LAE will function as a responsive extension of the City’s Public Works staff and provide dedicated oversight
throughout construction. Our responsibilities will include construction management and inspection, contractor
coordination, contract administration, schedule and cost monitoring, quantity verification, progress payment
review, change order management, labor compliance
coordination, materials testing coordination, traffic
control monitoring, public outreach, documentation, and project closeout.

We will be managing the construction activities, materials testing, geotechnical services, community relations contacts, and field inspection. Resident Engineering services will be provided for submittal coordination, pay requests, change order management and control, quality control, and general Construction Management services to support the construction efforts.

Technical items and submittal reviews will be coordinated with the Engineer of Record (EOR), Ryan J. Williams, P.E., of David Evans and Associates Inc., for this project. LAE worked with David Evans and Associates, Inc. on the Street Reconstruction Project Zone G – Phase 1 Project. The items will be documented and provided to the contractor, construction management and inspection team, and the City Project Manager. LAE will maintain the construction records and transmit them in an orderly and timely fashion to the City during and at the conclusion of the work. The construction duration of this project will be followed, according to the final specifications. The LAE team will review the Construction Contract documents for this project.

The project sites and project vicinity will be visited. We will participate in Pre-Bid meetings if requested. LAE will have a grasp of the project location and be aware of the proximity of the construction work to homes, schools and businesses.

LAE understands the scope of services related to this Street Reconstruction Project – Zone G (Phases 3 & 4) Project. We will be involved with the complete scope of services on the given City project.

The following are additional project understandings:
 The City intends to present the proposed task order for City Council approval at its October 6, 2026 meeting.  The project is currently at the 90% design stage, and the City anticipates advertising it for construction by October 9, 2026, or sooner. The bid due date and bid opening date have not yet been provided.  The anticipated construction duration is 100 working days, with portions of the work overlapping the Zone G Water Main Replacement Project.

Figure 1: Project Location
Tuesday, October 20, 2026 Reg CC MTG, Page *248
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 12 City of Lomita
 LAE will assign a dedicated Construction Observer/Inspector to this project and a separate Construction Observer/Inspector to the concurrent Water Main Replacement Project. Backup personnel will also be available for simultaneous critical activities, authorized overtime, or work at multiple locations.  LAE will perform or assist with community outreach, public notifications, and the resolution of concerns from affected residents and businesses, as requested by the City.
 Traffic and pedestrian control will be required along the project limits, including 247th Place, 252nd Street, Ebony Lane, Alcor Street, Walnut Street, 254th Street, Doria Avenue, and 255th Street.  Coordination will be required with City staff, the Los Angeles County Sheriff’s Department, Los Angeles County Fire Department, City of Los Angeles, utility companies, waste collection services, the Water Main Replacement contractor, and other affected stakeholders.
 The project requires a City of Los Angeles encroachment permit. LAE will coordinate permit requirements and monitor the contractor’s compliance with all applicable conditions.  Construction access, equipment staging, and laydown areas will be coordinated with the City to minimize impacts on residents, businesses, schools, traffic, and public services.  Land use and zoning: Residential.

Coordination with the Zone G Water Main Replacement Project LAE understands that this project will overlap with the City’s Zone G Water Main Replacement Project, which is expected to begin approximately one to two months earlier. Water main improvements are planned along Walnut Street, Ebony Lane, and 247th Place, the same streets scheduled for rehabilitation under this project. Close coordination between the two contractors, the City, utility agencies, and the project teams will therefore be essential. LAE will coordinate schedules, work areas, utility activities, traffic control, testing, temporary pavement restoration, and final paving to prevent conflicts and avoid disturbing newly completed improvements. Water main installation, testing, tie-ins, backfill compaction, and related utility adjustments will be closely tracked before affected roadway sections are released for final street rehabilitation. LAE will maintain coordinated look-ahead schedules and interface logs and will promptly identify activities that could affect either project’s schedule, cost, quality, or public access. A dedicated Construction Observer/Inspector will be assigned to the Street Reconstruction Project, while LAE’s Resident Engineer/Project Manager and support team members will oversee coordination across both contracts. Backup construction observation/inspection personnel will also be available to maintain coverage during simultaneous critical activities, authorized overtime, absences, or work occurring at multiple locations.

Existing Roadway and Site Conditions
An overview of pavement conditions, surroundings, and site features for each roadway is given below. 247th Place
247th Place is a local dead-end residential roadway lined with single-family homes, landscaped front yards, driveways, sidewalks, and curb and gutter on both sides.

On-street parking is common, and residential waste containers may occupy portions of the curbside on collection days. The existing asphalt pavement shows signs of aging, including longitudinal and transverse cracking, surface wear, patching, and previous utility-cut repairs. Based on the project plans, full pavement-section reconstruction is proposed to correct the underlying deficiencies, restore structural capacity, and provide a smooth and durable roadway surface. Since the street has limited access and numerous residential driveways, construction sequencing, resident notifications, emergency access, waste collection, parking restrictions, and continuous property access will require close coordination throughout the work. 252nd Street
252nd Street is a short residential cul-de-sac extending west from Ebony Lane and is bordered by single-family homes, landscaped front yards, driveways, sidewalks, and curb and gutter. The existing asphalt pavement exhibits widespread longitudinal, transverse, and interconnected cracking, along with surface wear and several previous pavement and utility-cut repairs. The project plans identify an asphalt concrete overlay to restore a smoother and more uniform driving surface, improve ride quality, and extend the roadway’s service life. Since the street has only one access point and includes a cul-de-sac turnaround, construction sequencing and traffic control will be important to maintain access for residents, emergency vehicles, deliveries, and waste collection. LAE will also closely monitor pavement Figure 2: Existing Conditions of 247th
Place
Figure 3: Existing Conditions of 252nd
Place
Tuesday, October 20, 2026 Reg CC MTG, Page *249
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 13 City of Lomita
preparation, crack treatment, utility adjustments, drainage transitions, asphalt placement, and connections to Ebony Lane to ensure a durable and properly finished roadway.

Ebony Lane
Ebony Lane is a two-lane neighborhood collector that connects residential streets with Lomita Boulevard and the surrounding commercial area. The roadway is bordered by single-family homes, driveways, sidewalks, curb and gutter, on-street parking, mature trees, overhead utilities, and community facilities, including Lomita Kiwanis Gardens and King’s Way Community Church. The existing asphalt pavement shows extensive longitudinal, transverse, and interconnected cracking, surface wear, utility-cut repairs, and localized patching, while the centerline striping is worn in several areas. The project plans identify an asphalt concrete overlay to restore a smoother, safer, and more durable roadway surface. Since Ebony Lane carries through traffic and provides access to residences, businesses, and community facilities, staged traffic control and continuous driveway, pedestrian, emergency, and service access will be essential.

Alcor Street
Alcor Street is a short residential cul-de-sac extending west from Walnut Street and is lined with single-family homes, landscaped yards, driveways, sidewalks, and curb and gutter. On-street parking is common along both sides, creating a relatively constrained construction area. The existing asphalt pavement shows surface damage, longitudinal and transverse cracking, previous utility-cut repairs, and localized deterioration near the concrete cross gutter at Walnut Street. The project plans identify full pavement-section reconstruction and fire hydrant improvements to address underlying pavement deficiencies, restore structural capacity, and provide a smooth and durable roadway surface. Since Alcor Street has only one point of access, LAE will closely coordinate construction sequencing, resident notifications, parking restrictions, emergency access, waste collection, driveway access, and the connection to Walnut Street. Particular attention will also be given to subgrade preparation, compaction, pavement transitions, drainage, and protection of adjacent concrete improvements.

Walnut Street
Walnut Street is a north-south neighborhood roadway that connects several residential streets with the commercial area near Lomita Boulevard. The corridor is bordered primarily by single-family homes, driveways, sidewalks, curb and gutter, on-street parking, mature landscaping, fire hydrants, and overhead utilities. The existing asphalt pavement shows surface oxidation, longitudinal and transverse cracking, localized patching, previous utility repairs, and wear around manholes and other utility covers. The centerline striping is also faded in several areas. The project plans identify an asphalt concrete overlay and associated curb-ramp, curbextension, and hardscape improvements to improve ride quality, accessibility, drainage, and the overall roadway condition. LAE will closely coordinate traffic control, property access, utility adjustments, paving transitions, and pedestrian movements.
254th Street
254th Street is a local residential roadway extending between Feijoa Avenue and Narbonne Avenue. It is bordered by single-family homes, landscaped yards, driveways, sidewalks, curb and gutter, mature trees, overhead utilities, and onstreet parking. Although the existing asphalt surface appears comparatively uniform, localized wear, pavement repairs, and potential underlying base or subgrade deficiencies may affect its long-term performance. The project plans identify pavement rehabilitation and localized curb, ramp, and hardscape improvements within the designated limits. Since the plans require pavement coring along 254th Street, LAE will closely monitor the verification of existing pavement thickness and condition before confirming the final rehabilitation treatment.

Figure 4: Existing Conditions of
Ebony Lane
Figure 5: Existing Conditions of Alcor
Street
Figure 6: Existing Conditions of
Walnut Street
Figure 7: Existing Conditions of 254th
Street
Tuesday, October 20, 2026 Reg CC MTG, Page *250
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 14 City of Lomita
Construction will also require careful coordination of residential access, parking restrictions, traffic control, utility facilities, and connections at Feijoa and Narbonne Avenues.

Doria Avenue
Doria Avenue is a local residential roadway with limited through access, bordered by single-family homes, landscaped front yards, driveways, sidewalks, curb and gutter, on-street parking, and overhead utilities. The existing asphalt pavement shows widespread longitudinal, transverse, and interconnected cracking, surface oxidation, localized patching, and wear along the wheel paths and pavement edges.

The project plans identify an asphalt concrete overlay to restore a smoother and more uniform driving surface, improve ride quality, and extend the pavement’s service life. LAE will closely monitor pavement preparation, crack treatment, localized repairs, utility adjustments, asphalt placement, and transitions at intersecting streets and driveways. Construction sequencing and public notification will also be important to maintain continuous access for residents, emergency vehicles, deliveries, and waste collection within this constrained residential area. 255th Street
255th Street is an east-west residential roadway extending from Walnut Street toward Western Avenue and the City limits. The corridor is bordered by single-family homes, driveways, sidewalks, curb and gutter, on-street parking, overhead utilities, and fire hydrants, with Alexander Fleming Middle School and a church located near the project area. The existing asphalt pavement shows extensive longitudinal, transverse, and interconnected cracking, surface wear, patching, and previous utility-cut repairs, indicating varying pavement conditions along the roadway. The plans identify an asphalt concrete overlay along most of the project limits and full pavement-section reconstruction near the eastern end. Pavement coring will be required to verify the existing section and confirm the appropriate rehabilitation treatment. LAE will closely coordinate school access, pedestrian safety, traffic control, resident notifications, driveway access, utility adjustments, and work near Western Avenue and the City boundary.

Experience and Lessons Learned
LAE has served the City of Lomita under its on-call agreement since 2018 and recently completed the Street Reconstruction Project – Zone G Phase 1. This direct experience provides our team with a clear understanding of the City’s construction standards, administrative procedures, documentation requirements, and expectations for contractor performance.

Drawing on our Phase 1 experience, LAE will place particular emphasis on:
 Asphalt surface and gutter-lip tolerances
 Accurate sidewalk and curb-ramp quantity measurements  Pavement, gutter, and work-area cleanup
 Utility verification and potholing
 Identification and removal of unsuitable subsurface materials  Permit readiness before construction begins
 Complete and timely daily inspection reporting
 Approved staging and equipment-storage locations
 Prevention of unauthorized overnight equipment parking  Maintenance of driveway, pedestrian, and emergency access  Timely resolution of field issues before they affect paving operations LAE recognizes that the principal challenges will include coordinating two overlapping construction contracts, maintaining access within residential areas, managing unknown utility and subgrade conditions, enforcing ADA and materials requirements, satisfying outside-agency permit conditions, and completing the improvements within the City’s approved schedule and budget.

Our familiarity with the City and recent experience within Zone G position LAE to identify these issues early, minimize disruption, and deliver a coordinated, high-quality project.

Figure 8: Existing Conditions of Doria
Avenue
Figure 9: Existing Conditions of 255th
Street
Tuesday, October 20, 2026 Reg CC MTG, Page *251
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 15 City of Lomita
Key Challenges
LAE recognizes that successful project delivery will require proactive management of several interrelated construction, coordination, access, quality, schedule, and budget challenges, including the following:
 Coordinating street improvements on Walnut Street, Ebony Lane, and 247th Place with the concurrent Zone G Water Main Replacement Project to prevent conflicts and damage to newly completed pavement.  Maintaining adequate Construction Observation/Inspection coverage and contractor coordination across eight roadway segments where construction activities may occur simultaneously.  Maintaining residential, driveway, pedestrian, emergency, school, waste collection, and business access while managing traffic, parking restrictions, and temporary closures.  Addressing unknown utilities, utility relocations, pavement thickness variations, weak subgrade, unsuitable materials, and other unforeseen field conditions.
 Ensuring asphalt, concrete, ADA improvements, utility adjustments, drainage transitions, and materials testing comply with the plans, specifications, and quality requirements.  Completing the project within the 100-working-day schedule and approved budget while managing Caltrans and City of Los Angeles permit conditions, change orders, public concerns, and potential construction delays.

Scope of Work and Project Approach
LAE’s project approach is built on a thorough understanding of the City’s objectives, project requirements, and anticipated challenges. Drawing on our proven expertise in construction management, inspection, labor compliance, and material testing, we will deliver a proactive, solutions-focused approach that emphasizes quality, safety, schedule adherence, and cost control. The following tasks outline LAE’s responsibilities and approach in delivering comprehensive services for the City from pre-construction to project closeout, ensuring quality, efficiency, and compliance at every stage.

Task 1 – Constructability Review
LAE will conduct a thorough and systematic constructability review upon execution of the Professional Services Agreement (PSA). This process will ensure that all construction plans, specifications, and related documents are clear, feasible, and optimized for efficient execution before work begins in the field. By identifying and addressing potential challenges early, LAE will help the City avoid costly delays, change orders, and rework during construction.

Our review will be led by our experienced Senior Construction Manager and Construction Observer/Inspector in coordination with the City’s project management team, the design consultant, and other stakeholders as necessary. We will utilize our extensive municipal construction experience to ensure that the project is ready for successful execution.

The constructability review will include, but not be limited to, the following actions:
 Examine all construction drawings and specifications in detail to verify completeness, accuracy, and consistency with applicable Federal, State, and local standards.
 Identify any design ambiguities, missing details, or potential conflicts within the documents that could impact construction efficiency.
 Assess whether the design and specifications allow for practical sequencing of work and efficient contractor mobilization and demobilization.
 Evaluate existing site conditions in relation to the design to confirm constructability and identify potential constraints such as staging areas, site access, and traffic control requirements.  Identify cost-effective alternatives to materials, methods, or phasing that will maintain quality while reducing cost or construction time.
 Highlight potential construction challenges, such as space limitations, weather-dependent activities, or complex coordination requirements, and propose proactive mitigation measures.

Deliverables and Outcomes
 Summary of identified constructability issues, comments, and suggested considerations for the City’s review.

Figure 10: Cross-Gutter and
Spandrel Removal
Tuesday, October 20, 2026 Reg CC MTG, Page *252
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 16 City of Lomita
 Updated mark-ups or redlined plan sheets will be prepared, where necessary, to clearly illustrate proposed adjustments.
 Coordination meetings will be held with the City and design team to finalize all approved changes prior to issuing the Notice to Proceed.

Task 2 – Project Coordination
Kevin Alamolhoda, P.E., with over ten (10) years of municipal public works experience with LAE, will serve as the Resident Engineer (RE) for this project. He has successfully managed street reconstruction and improvement projects, water, sewer, traffic signal, and accessibility projects, ensuring compliance, cost control, and schedule adherence. Mr. Alamolhoda will coordinate closely with LAE team members, City staff, contractors, and stakeholders to deliver the project efficiently and to the highest quality standards.

As the City’s selected Construction Management and Inspection (CM&I) Consultant, we will thoroughly review the Plans, Specifications, and Estimate (PS&E) package and conduct field walks to have a complete understanding of the project. Upon receiving the City’s Notice to Proceed with CM&I Services, we will request a kick-off meeting with the City’s Representative(s) to introduce our LAE team, discuss project details, and schedule. We will then send out a Pre-Construction Conference notice to schedule a meeting with the City’s representatives from various departments, project design team, contractor, sub-contractors, utility companies, LAE team, schools, neighboring cities (if applicable), and other stakeholders. LAE will prepare the Pre-Construction meeting agenda in accordance with the City’s guidelines for the City’s review.

The following items will be reviewed at the Pre-Construction meeting:
 Plans and Specifications.
 Project Schedule and Long Lead Items Procurement
Time.
 Submittals and the approval process.
 Geotechnical Materials Testing Services.
 Impacted Utilities.
 Labor Compliance Administration (Interviews, Payroll
Reviews, etc.).
 Weekly Statement of Working Day Reports.
 Contract Change Order (CCO) process.
 Coordination with the City Departments and other
impacted agencies.
 Street Sweeping, Truck Routes, and Waste Pickup
Schedules.
 Coordination with transit companies and similar
entities.
 Schools, residents, and businesses that are affected
by the project.
 Public Notices.
 Construction Schedule.
 Traffic Control/Phasing Plan.
 Encroachment Permit(s).
 Agreed communication with the Construction
Manager and Project Inspector.
 Traffic Signal timing/synchronization.
 Contract time.
 Progress meetings.
 Construction Observation process.
 Final project walkthrough.
 Punch list items.
 Preparation of as built drawings.
 Project acceptance and Other relevant details.

LAE will ensure all construction activities comply with the City’s Standards, contract documents, the Greenbook with supplements, approved deviations, and applicable industry standards.

Management, Meetings, Schedule/Budget and Miscellaneous Sub-tasks Scheduling, attending, and participating in meetings, preparing agendas, and minutes. Other tasks include overseeing LAE's Construction Observer/Inspector, reviewing construction schedule, coordination with City’s staff, design team, utility companies and other agencies, submittal reviews, traffic control plans’ review, striping plan review, progress payment requests, and Contract Change Orders. Additionally, LAE’s CM will review/resolve contract claims, assist with public outreach, monitor contractor’s survey work.

Project Startup
LAE will provide the level of effort to inspect and monitor the Contractor’s work for commissioning and start-up of all individual systems, as well as overall start-up. LAE will check and inspect to ensure that all project facilities have been properly installed for every component of the Project.

Figure 11: ADA Compliant Curb
Ramp
Tuesday, October 20, 2026 Reg CC MTG, Page *253
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 17 City of Lomita
Schedule
Our approach to Schedule Control consists of having the contractor prepare a baseline schedule, laying out the project scope, milestones, key dates, critical path, and phases of work using scheduling software such as Microsoft Office, Primavera, etc. We will compare the contractor’s schedule with the contract document term(s) and determine the accuracy.

At progress meetings, construction schedule and “Look Ahead” activities are reviewed among other items. When activities slip from their proposed date of completion, we collaborate with the contractor to ensure a proper recovery plan. LAE’s CM will ensure that the Contractor updates the Project Schedule to represent up-to-date construction conditions and reflect the decisions made. Parties will be notified of any deviation from the schedule, and noncompliance will be corrected accordingly.

Tasks Sep
'26
Oct
'26
Nov
'26
Dec
'26
Jan
'27
Feb
'27
Mar
'27
Apr
'27
May
'27
Jun
'27
CM&I Proposal Due
CM&I Final Selection
Anticipated Start of CM&I Services
Advertising Contract Documents for Bids
Bid Opening
City Council Approval of Construction Contract
City Staff to Mail Contact Documents to the
Contractor

Pre-Construction Meeting
Contractor to Submit All Submittals for Review
City to Approve Contractor’s Bonds, Insurance
Certificates, and Contract

Acceptance of Contractor Submittals
Contractor to Mobilize
Start of Actual Construction
Complete Construction
The dates shown in the project timeline are estimates based on current assumptions and are subject to adjustment depending on actual project start, site conditions, and other factors.

Construction Contract Administration
As the City’s CM team, LAE will ensure that the construction duties of this project are conducted in line with the City’s contract documents, Standard plans, specifications, approved materials list, Standard Specifications for Public Works Construction (Green Book) with all supplements, any variation from or exception to the Standards, other City and industry standards.

Submittals and Requests for Information
Submittals and RFIs will be reviewed by LAE and the Engineer of Record to ensure any deviations of submittals submitted by the Contractor are equal to or of better quality than specified in the contract documents. A submittal log will be maintained to keep track of required submittals before and during the project work. These include but are not limited to:

Shop Drawings, Traffic Control/Phasing Plans; Project Baseline Schedule; Contractor’s Emergency Contact List; Dig Alert ticket(s); Public Notification Letter; Material Haul Route(s); Mix designs; Certificates of compliance for materials; NPDES Requirements; Contractor's Safety Plan; Certified Payrolls; Solid Waste Management and Recycling Plan; Contractor’s Safety Meeting and other documentation. Submittals will be reviewed in a prompt manner. The City’s Construction Management Software, if applicable, will be used to have clear visibility of project documents.

Web Based Document Control System
If applicable, LAE will utilize the City’s supplied construction management software to manage electronic and hard copy files, maintain a logging system including dates received and returned of all documents (submittals, RFIs, correspondence, etc.), upload and link files, provide notifications of overdue items, provide comments and feedback, review turnaround time, follow up on submittals needing to be resubmitted, manage personnel access to data, among other tasks. We will keep Tuesday, October 20, 2026 Reg CC MTG, Page *254
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 18 City of Lomita
track of RFIs, submittals, O&M manuals, progress payments, change orders, and other items as agreed upon with the City, and provide regular reports as requested.

Review Traffic Control Plan
LAE will coordinate the review of the contractor’s traffic control plans required by the City and discuss them with the City’s Project Manager. The final plans will be approved by the City based on LAE’s comments and recommendations.

RFI Log
LAE will keep track of the Contractor’s RFI number, description, date of submittal, date of review, date of return, status, and reviewer of the RFI. Responses to RFIs will be done based on thorough review of the requested information, site visits, consultation with the Designer and City staff.

Contract Change Orders
The CM will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval. CCOs will be reviewed with the Contractor, Inspector, and field verified prior to discussing them with the City.

Review of Contract Claims
Manage and coordinate potential issues before they escalate into formal claims. Provide assistance to City personnel in resolving disputes with parties involved, including utilities and contractors, to prevent disputes from arising.

Dispute Resolution
The CM will bring their prior project experience to prevent disputes from arising. By employing clear communication, project understanding, and effective management, LAE will proactively avoid potential disagreements. Disputes will be addressed professionally and resolved by referencing relevant project plans, specifications, and guidelines, such as the Greenbook, City Standard Operating Procedures, Caltrans manuals, American Water Works Association (AWWA), and others.

Design Clarifications
LAE will identify the need for design clarifications and request the Design Engineer to prepare the necessary clarification.

LAE will log and monitor all design clarifications. The Contractor will review design inquiries with field staff and the Construction Manager. LAE will request RFIs detailing the design clarification from the Contractor and will review them with the Designer. In collaboration with the Designer, LAE will provide a response to the Contractor to resolve the design issue, allowing construction to proceed at the clarification location.

Progress Billings
We will receive the Contractor’s monthly payment requests, review them with Inspection Staff to ensure quantities are accurately stated, and provide the City with appropriate backup documentation. LAE will make a written recommendation for payment to the City.

Record Drawings
The Construction Observer (CO) will have a copy of the plans on the site with all up-to-date changes. The CO will review field changes with the contractor weekly to ensure changes are accurately documented. As-Built Drawings will reflect the installed construction as it was built. LAE will ensure that the As-Built Drawings are in compliance with the project plans, specifications, and applicable codes and standards. Upon completion of construction, LAE will collect the As-Built Drawings, review them, and provide them to the City and/or involved parties. The As-Builts can then be delineated by the designer for preparation of the Record-Drawing.

Operations and Maintenance Manuals
LAE will coordinate the preparation of operation and maintenance manuals (OMMs) as provided by the Design Engineer and the General Contractor. LAE will verify that the number and content of the manuals are complete and accurately reflect the work completed and required by the contract documents. LAE will check that each OMM prepared by the Contractor conforms with the contract documents prior to submittal to the Design Engineer and City for review and comment. LAE will return incomplete and inaccurate documents to the Contractor for correction.

Environmental and Regulatory Agency Compliance
LAE will coordinate as needed with regulatory agencies, nearby cities, the City of Lomita, and relevant departments to manage the construction contract and ensure environmental compliance. This includes reviewing and commenting on Water Tuesday, October 20, 2026 Reg CC MTG, Page *255
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 19 City of Lomita
Quality Management Plans (WQMP) and Stormwater Pollution Prevention Plans (SWPPP), verifying contractor adherence through inspections, and monitoring compliance with stormwater regulations. LAE will also oversee and inspect system commissioning, start-up, utility shutdowns, tie-ins, and related work to confirm that all equipment and facilities are properly installed, calibrated, and fully operational.

Quality Assurance/Quality Control (QA/QC)
LAE’s QA/QC procedures are designed to ensure full compliance with project objectives, contract documents, and applicable standards through a structured, results-driven approach. Prior to construction, the team will conduct a comprehensive review of the Plans, Specifications, and Estimates (PS&E) to identify potential issues, verify constructability, and confirm alignment with funding requirements. A project-specific workplan will be implemented to monitor quality, schedule, and budget concurrently, with proactive measures to address deviations before they impact progress. LAE’s Construction Management systems will track submittals, inspections, and corrective actions in real time, ensuring that all work meets or exceeds the City’s standards, safety requirements, and industry best practices.

Task 3 – Construction Observation/Inspection
LAE's experienced team will conduct thorough field observation and inspection to ensure the project's compliance with the contract documents, regulations, and codes. We will attend field meetings and provide the necessary materials testing service.
 Attend all meetings related to the construction project.  Ensure compliance with Americans with Disabilities Act (ADA) and all contract requirements.
 Schedule and coordinate sampling and testing of construction materials.  Receive, verify, initial, and retain delivery tickets for materials.  Record changes made during construction for the preparation of record drawings.
 Report any violations of applicable regulations.
 Maintain a copy of all contract documents and construction-related documents on-site.
 Take and maintain project site and construction activity photos for documentation purposes.
 Communicate with utility companies and other agencies as necessary.  Prepare Daily Inspection Reports, which will consist of:
 Contractor's working hours on the jobsite.
 Contractor and sub-contractor personnel and equipment on site.  Weather conditions and their impact on the progress of work.  Tasks or instructions given to the contractor.
 Daily use of the contractor and sub-contractor equipment.  Observations relevant to work progress, including deficiencies or contract violations by the contractor.  Delivery of materials to the project site.
 Observed or foreseen delays, their reasons, and the contractor's response.  Review of the Contractor's two-week look-ahead schedule.  Claims, additions, and removals pertaining to contract items.  Visitors who come to the job site with an interest in the project.  Work activities and construction progress.
 Quantities measurements.
 Photographs to document construction progress and activities.

Task 4 – Labor Compliance
LAE will ensure the prime Contractor and Subcontractor(s) submit Certified Payrolls and other related documents in a timely manner. We will review the certified payroll records, interview the Contractor/sub-contractors, and provide reports. Labor Compliance services will be performed by LAE’s subconsultant, GCAP Services.  Attend the pre-construction meetings and ensure the prime contractors and sub-contractors attend the preconstruction meetings, submit Certified Payrolls and other related documents. Review the labor compliance administration and interview process with Contractors and sub-contractors.  Interview contractors/subcontractor(s) workers as required.

Figure 12: Inspector Observing Road
Construction Activity
Tuesday, October 20, 2026 Reg CC MTG, Page *256
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 20 City of Lomita
 Ensure proper posting of the appropriate Federal and State Wage Determinations and Federal labor compliance posters on the project sites.
 Review the Certified Payroll records, fringe benefit statements/other documents, interview forms, daily logs, and compare for accuracy. Prepare reports of any deficiencies.  Request Contractors to turn in back up documents for the contractor, sub-contractors, second tier sub-contractors, and unlisted sub-contractors.
 LAE has provided these services in-house or through GCAP Services, our sub-consultant, for the following Cities:

Arcadia, Azusa, Baldwin Park, Chino (Streets and Water Department), Claremont, Diamond Bar, El Monte, Elsinore Valley Municipal Water District, Laguna Niguel, Lomita, Montclair, Perris, Pomona, San Dimas, Seal Beach, Signal Hill, Western Municipal Water District, and Yorba Linda.

Task 5 – Materials Sampling/Testing
Materials Sampling/Testing (Optional) will be provided by Geo-Advantec, Inc. (GAI) of San Dimas. GAI with Caltrans Certified Laboratory and Technicians will provide the required Geo-technical and Quality Assurance/Quality Control (QA/QC) services. GAI has assisted the following LAE clients with similar projects since 2016: Arcadia, Azusa, Chino, Compton, El Monte, Lomita, and Montclair. GAI will provide the required Materials Testing services for the project in accordance with the contract documents. GAI provides a full range of responsive and quality geotechnical engineering, materials testing, and inspection services for all project phases.

GAI currently has a team of about twenty (20) registered civil and geotechnical engineers, geologists, field and laboratory technicians, and special soil inspectors with a wide range of skills on roadway, transportation as well as pavement rehabilitation projects. They will provide field testing of subgrade, aggregate base, and asphalt pavements. GAI will also provide soil base materials, asphalt concrete, rubberized asphalt, concrete, and other laboratory testing of the construction materials in accordance with the City’s contract document requirements. They will also provide sampling, observation, and testing for federally funded projects in accordance with City’s Caltrans approved QAP. They will prepare and submit test results daily to construction management teams. As part of their services, they will provide materials testing management and engineering support, as needed.

Task 6 – Utility and Outside Agency Coordination
LAE will coordinate closely with all affected utilities, City departments, emergency services, and waste management providers to prevent service disruptions and keep the project on schedule. Our team will review the scope with each utility, resolve conflicts promptly, and manage any required relocations. We will also support the City’s public outreach efforts, with Grace Alvarez providing Spanish translation as needed to ensure effective communication with all residents. To achieve this, LAE will:
 Notify utilities, emergency services, and waste providers before construction and engage them in the pre-construction meeting.  Review project scope with each utility, address conflicts, and expedite relocation work if needed.
 Resolve unforeseen utility conflicts quickly during construction.  Provide Spanish translation and assist with resident communications to address concerns, if requested.

Task 7 – Project Closeout/Post-Construction
We will schedule a final walkthrough with involved parties. A punch list will be prepared throughout construction and finalized after the final walkthrough, defining items needing attention. The As-Built drawings will be finalized for record Drawing preparation. Upon completion of the punch list items and acceptance of the project by the City, applicable City staff, and impacted utilities, LAE will compile and provide the project files to the City in both electronic and hard-copy formats, as requested by the City. LAE will also collect applicable O&M manuals and provide them to the City. Contract closeout will include project handover to the City and demobilization of the Contractor and CM team.

Figure 13: Asphalt Density Testing
Figure 14: Public Notice for Upcoming
Construction Activities
Tuesday, October 20, 2026 Reg CC MTG, Page *257
Q

FEE PROPOSAL
Tuesday, October 20, 2026 Reg CC MTG, Page *258
Street Reconstruction Project – Zone G (Phases 3 & 4) Page | 21 City of Lomita

FEE PROPOSAL
A fee schedule/fee proposal has been submitted in a separate document. 1 Tuesday, October 20, 2026 Reg CC MTG, Page *259
Exhibit B.1
Tuesday, October 20, 2026 Reg CC MTG, Page *260
Tuesday, October 20, 2026 Reg CC MTG, Page *261
Tuesday, October 20, 2026 Reg CC MTG, Page *262
Tuesday, October 20, 2026 Reg CC MTG, Page *263
Tuesday, October 20, 2026 Reg CC MTG, Page *264
Tuesday, October 20, 2026 Reg CC MTG, Page *265
Tuesday, October 20, 2026 Reg CC MTG, Page *266
Tuesday, October 20, 2026 Reg CC MTG, Page *267
Tuesday, October 20, 2026 Reg CC MTG, Page *268
Tuesday, October 20, 2026 Reg CC MTG, Page *269
Exhibit B.2
Tuesday, October 20, 2026 Reg CC MTG, Page *270
Tuesday, October 20, 2026 Reg CC MTG, Page *271
Tuesday, October 20, 2026 Reg CC MTG, Page *272
Tuesday, October 20, 2026 Reg CC MTG, Page *273
Tuesday, October 20, 2026 Reg CC MTG, Page *274
Tuesday, October 20, 2026 Reg CC MTG, Page *275
Tuesday, October 20, 2026 Reg CC MTG, Page *276
Tuesday, October 20, 2026 Reg CC MTG, Page *277
Tuesday, October 20, 2026 Reg CC MTG, Page *278
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Attachment 4
Tuesday, October 20, 2026 Reg CC MTG, Page *279
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *280
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *281
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *282
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *283
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *284
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *285
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *286
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *287
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *288
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *289
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *290
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 562646121
Tuesday, October 20, 2026 Reg CC MTG, Page *291
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *292
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *293
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *294
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *295
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *296
Docusign Envelope ID: 90E585B3- CA8D- 829B-8352-FE1135410911 Tuesday, October 20, 2026 Reg CC MTG, Page *297
1 TO: City Council
FROM: Andrew Vialpando, City Manager
PREPARED BY: Adrian Fernandez, Community and Economic Development Director
MEETING DATE: October 20, 2026
SUBJECT: Zoning Text Amendment No. 2026-05 – A Code Update Related to Residential Carports

RECOMMENDED ACTION
Introduction of an ordinance approving Zoning Text Amendment No. 2026-05 to amend Section 11-1.30.04(E) (Carports) of Lomita Municipal Code (LMC) Title XI (Planning and Zoning) Chapter 1 (Zoning) and find the action to be categorically exempt from the California Environmental Quality Act (CEQA).

BACKGROUND
On September 14, 2026, the Planning Commission unanimously voted in favor of adopting Resolution No. PC 2026-15, recommending that the City Council adopt an ordinance to approve the proposed Zoning Text Amendment (ZTA) and other revisions.

Additional related revisions to the Site Plan Review process are also included, and the incorporation of a new Zoning Clearance section for ministerial projects.

DISCUSSION
Pursuant to LMC Section 11-1.30.04(E), a residential carport may only be permitted with a Modification and Site Plan Review. A Modification and Site Plan Review are land use entitlements that are subject to specific findings that must be made in support of each. A Modification may be requested for deviations to certain residential development standards such as building setbacks, utility equipment setbacks, lot frontage, combined area of accessory buildings/structures in the rear yard, and fence and wall height limit. A Modification is also required for a residential carport.

A conflict exists in this section of the Zoning Code because a carport structure is inherently different from other typical requests that are subject to a Modification request.

CITY OF LOMITA

CITY COUNCIL REPORT
Item No. 9a
Tuesday, October 20, 2026 Reg CC MTG, Page *298
2 Pursuant to LMC Section 11-1.70.08, finding B, carport structures are not considered a development standard. This distinction is significant in the findings for a Modification.

The above-referenced finding is not suitable for a carport and conceivably could not be made for a carport, as it is not typically associated with physical constraints for which relief is needed from a technical standard. If this finding cannot be made in support of a carport, the carport cannot be approved. This results in an endless loop. To solve this matter, staff is recommending that a residential carport not be subject to a Modification.

ENVIRONMENTAL REVIEW
Staff finds that adoption of this Zoning Text Amendment is not subject to CEQA pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. The proposed Zoning Text Amendment revises the City’s administrative procedures by removing the Modification requirement for residential carports. The amendment does not authorize any development or change any General Plan land use designation, zoning classification, permitted land use, or development standard. Accordingly, adoption of the ordinance will not result in a direct or reasonably foreseeable indirect physical change in the environment and is not a “project” within the meaning of CEQA Guidelines section 15378. Alternatively, the adoption of this Ordinance is exempt from CEQA because it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. (State CEQA Guidelines, § 15061(b)(3).)

PUBLIC NOTICE
Notice of this hearing dated October 20, was published in The Daily Breeze Newspaper and posted at City Hall, Lomita Park and the City’s website.

FISCAL IMPACT
There are no financial implications resulting from this recommendation.

OPTIONS

1. Approve the proposed zoning text amendment.

2. Adopt the Ordinance with specified amendments.

3. Request additional studies and continue the item to a future City Council meeting.

4. Do not recommend approval of the zoning text amendment.

Tuesday, October 20, 2026 Reg CC MTG, Page *299
3 ATTACHMENTS

1. Draft Ordinance with Exhibits A (Proposed Zoning Text Amendment)

2. Redline Zoning Text Amendment

3. Resolution No. PC 2026-15
Approved by:
.
______________________
Andrew Vialpando
City Manager
Prepared by:
.
__________________________
Adrian Fernandez, Community and Economic Development Director Tuesday, October 20, 2026 Reg CC MTG, Page *300
ORDINANCE NO. 902

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMITA, CALIFORNIA, APPROVING ZONING TEXT AMENDMENT NO. 2026-05 TO AMEND SECTION 11-1.15.02 OF LOMITA MUNICIPAL CODE TITLE XI (PLANNING AND ZONING) CHAPTER 1 (ZONING) AND LOMITA
MUNICIPAL CODE TITLE XI (PLANNING AND ZONING) CHAPTER 2 (DIVISION OF LAND), AND FINDING THE ACTION TO BE

CATEGORICALLY EXEMPT FROM THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT

THE CITY COUNCIL OF THE CITY OF LOMITA DOES HEREBY ORDAIN AS FOLLOWS:

Section 1. Recitals.

A. In accordance with LMC Section 11-1.70.05, the Community and Economic Development Director initiated Zoning Text Amendment No. 2026-05 in order to update the requirement of a Modification for a residential carport, amendment to the Site Plan Review process and incorporation of a new Zoning Clearance process for ministerial projects.

B. On September 14, 2026, the Planning Commission, which is responsible for reviewing any updates to the Lomita Zoning Code (LMC Title XI) and forwarding a recommendation to the City Council, held a duly noticed public hearing on the proposed Zoning Text Amendment, where public testimony was accepted on the item. The Planning Commission unanimously voted in favor of adopting Resolution No. PC 2026-15, recommending the City Council approve the proposed zone text amendment.

C. On October 20, 2026, the City Council held a duly noticed public hearing to consider the Zoning Text Amendment Ordinance, including: (1) the public testimony and agenda reports prepared in connection with the Ordinance, (2) the policy considerations discussed therein, and (3) the consideration and recommendation by the City’s Planning Commission.

Section 2. Incorporation. The recitals above are true and correct and are each incorporated by reference and adopted as findings by the City Council.

Section 3. Environmental Review. The City Council finds that adoption of this Zoning Text Amendment is not subject to CEQA pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly.

The proposed Zoning Text Amendment revises the City’s administrative procedures by removing the Modification requirement for residential carports. The amendment does not Tuesday, October 20, 2026 Reg CC MTG, Page *301
Ordinance No. 902

Page 2 of 3 ends