RECOMMENDATION:

Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802 (562) 570-6383
R-24
Determine that the granting of Facility/Pipeline Permit Supplement No. S-16-22 under existing Facility/Pipeline Permit No. P-239-11 to The Boeing Company, will not be contrary to the public interest; and, authorize the City Manager, or designee, to issue said Permit Supplement in accordance with Section 15.44.060, Permit Issuance, of the Long Beach Municipal Code for the installation of electrical conduits to power extraction wells for groundwater remediation along Harvey Way, East Village Road, and Blackthorne Avenue. (District 5)

DISCUSSION
The Boeing Company has filed an application for Facility/Pipeline Permit Supplement No. S- 16-22, under existing Facility/Pipeline Permit No. P-239-11, to install 2,607 feet of piping along Harvey Way, East Village Road and Blackthorne Avenue. Vicinity map for the location and description of the installation is attached (Attachment A).

This installation will allow The Boeing Company to remediate area groundwater by extracting the groundwater through wells and delivering it to an off-site treatment system through this piping where it may be treated and injected back into the subsurface through other wells or into the City of Long Beach (City) sewer system per Industrial Wastewater Discharge Permit No.017109, approved by the Long Beach Water Department (Attachment B). This new pipeline will be part of the same system initially approved by the City Council on December 5, 2006, for Facility/Pipeline Permit Supplement Nos. S-1-11, S-2-11, S-3-11 and S-4-17 under Facility/Pipeline Permit No. P-239-11.

The Department of Public Works (Public Works) has reviewed the application and found the proposed pipeline to be compatible with existing installations and not an obstacle to any street use or any known proposed developments.

Traffic control requirements, stipulated by the Public Works Traffic Engineering Division, will be included in the special conditions for the excavation permit. In addition to typical trench resurfacing, The Boeing Company will be required to slurry seal the area. Liability insurance and cash bond for faithful performance will be processed following the City Council authorization of the permit supplement.

This matter was reviewed by Deputy City Attorney Erin Weesner-McKinley on March 2, 2022 and by Budget Management Officer Nader Kaamoush on February 23, 2022.

HONORABLE MAYOR AND CITY COUNCIL
March 22, 2022

Page 2 ends

TIMING CONSIDERATIONS
City Council action is being requested on March 22, 2022, to grant Facility/Pipeline Permit Supplement No. S-16-22, under existing Facility/Pipeline Permit No. P-239-11 and allow commencement of this work.

FISCAL IMPACT
If the Facility/Pipeline Permit Supplement is approved, one-time permit fee of approximately $57,592 and an annual franchise fee of approximately $3,539 will be deposited in the General Fund Group in the Public Works Department. This recommendation has no staffing impact beyond the normal budgeted scope of duties and is consistent with existing City Council priorities. There is no local job impact associated with this recommendation.

SUGGESTED ACTION:

Approve recommendation.

Respectfully submitted,
Lh

ERIC LOPEZ

DIRECTOR OF PUBLIC WORKS
EL:BP:md:11:rm:dr
ATTACHMENTS: A - SITE LOCATION MAP AND DESCRIPTION

B - INDUSTRIAL WASTEWATER DISCHARGE PERMIT
APPROVED:

THOMAS B. MODICA

CITY MANAGER
1,139.83 feet of 1-inch by 3-inch double-contained pipeline:

In Harvey Way, beginning at a point 2 feet north of centerline of Harvey Way and 236 feet east of Blackthorne Avenue centerline, thence west 230.54 feet parallel with centerline of Harvey Way; thence south at a right angle approximately parallel with the centerline of Blackthorne Avenue for 326.29 feet to a point 8 feet east of centerline of Blackthorne Avenue and 10 feet north of centerline of Warwood Road; thence one branch of the pipeline continues east at a right angle approximately parallel with centrline of Warwood Road for 378.00 feet to a point 13 feet north of centerline of Warwood Road; line terminates at EW0058 well vault.

In East Village Road, beginning at a point 7 feet north of East Village Road and 10 feet east of Blackthorne Avenue, thence east 205.00 feet approximately parallel with centerline of East Village Road to a point 13 feet north of centerline of East Village Road; line terminates at EW0057 well vault.
828.32 feet of 2-inch by 4-inch double-contained pipeline:

In Blackthorne Avenue, beginning at a point 8 feet east of centerline of Blackthorne Avenue and 10 feet north of centerline of Warwood Road, thence south 337.38 feet to a point 7 feet north of East Village Road and 10 feet east of Blackthorne Avenue; thence one branch of the line jogs to the southwest for a distance of 46.33 feet to a point 8 feet northwest of centerline of East Village Road and 193.71 feet northeast of centerline of East Greenmeadow Road; thence line jogs southwest to run parallel to centerline of East Village Road for 210.61 feet; thence one branch of the line southeast at a right angle parallel to centerline of East Greenmeadow Road for 234.00 feet; line terminates at EW2155 well vault.
639.39 feet of 4-inch by 8-inch double-contained pipeline:

In East Village Road, beginning at a point 8.3 feet northeast of East Greenmeadow Road centerline and 4.9 feet northwest of East Village Road centerline, thence one branch of the line southwest parallel to East Village Road centerline for 146.7 feet; thence southeast at a right angle parallel to the sanitary sewer line in Alleyway northeast of Norse Way for 313.63 feet; thence line jogs easterly to a point 3 feet east of southerly sanitary sewer line and 3 feet south of southeasterly sanitary sewer line for 103.59 feet; thence line jogs southerly parallel to southerly sanitary sewer line for 75.47 feet to a point 119 feet north of Carson Street and 3 feet east of southerly sanitary sewer line, where line connects to existing pipeline.

Four 3-inch electrical conduits run in line with all aforementioned segments, totaling 2600.82 feet per conduit line and 10,015.80 feet for all four conduits.

PREVIOUSLY INSTALLED CARSON ST PIPELINE DESCRIPTION
IN CARSON STREET – (1)-3” ENVIRONMENTAL PIPELINE WITH (2)-1” PVC CONDUITS LOCATED 5’ NORTH OF THE S’LY CURBFACE STARTING 353’ EAST OF THE CL OF LAKEWOOD BL THEN GOING SOUTH TO THE CURBFACE FOR 6’, ALSO ATTACHMENT A Page 1/3
Site Description
GOING EAST PARALLEL TO THE CURBFACE GOING EAST FOR 153’ TO AN ANGLE POINT THEN SOUTH EAST TO THE PROPERTY FOR APPROX 42’.

ALSO CROSSING CARSON STREET WITH A 22” CASING WITH (1) 4”x8” ENVIRONMENTAL PIPELINE WITH (4)-3” ELECTRICAL LINES STARTING FROM THE N/S ALLEY EAST OF NORSE WAY 690’ EAST OF THE CL OF LAKEWOOD BLVD AND 90’ NORTH OF THE CL OF CARSON STREET THEN GOING SOUTH 105’ THEN TURNINGWEST WITH (1)-4”x8” ENVIRONMENTAL LINE WITH (4)-3” ELECTRICAL CONDUITS FOR A DISTANCE OF 52.5’ TO BE CAPPED FOR FUTURE. WORK IS TO BE PLACED VIA BORE PIT AND AGUER.

SUMMARY: 1,139.83 feet of 1-inch by 3-inch double-contained pipeline 828.32 feet of 2-inch by 4-inch double-contained pipeline 693.30 feet of 4-inch by 8-inch double-contained pipeline 10,846.80 feet of 3-inch electrical conduit and environmental pipeline 402 feet of 1-inch PVC conduit
ATTACHMENT A Page 2/3

ALLEYWAY EAST VILLAGE ROAD

BLACKTHORNE AVENUE

GREENMEADOW RD

EAST VILLAGE ROAD

WARWOOD ROAD

HARVEY WAY

ALLEYWAY

EAST CARSON STREET
Proj. Number:

Sheets:

February 02, 2022Date:

Revision Date Description

REVISIONS
Approved by:

Designed by:

Designed by:

Engineering Analytics, Inc.
1600 Specht Point Road, Suite 209
Fort Collins, CO 80525
(970) 488-3111

THE BOEING COMPANY

LONG BEACH, CALIFORNIA
BUILDING 3 GROUNDWATER EXTRACTION

AND TREATMENT SYSTEM EXPANSION

PIPELINE ROUTE

PUBLIC RIGHT OF WAY

NORTH OF EAST CARSON
STREET
LEGEND

EXISTING PIPELINE

PROPOSED PIPELINE

ATTACHMENT A
Site Location Map