Cities Index.
040522-R-35sr&att.pdf

Long Beach City Council
April 5, 2022

Document
040522-R-35sr&att.pdf
Meeting
April 5, 2022
Body
Long Beach City Council
Pages
4
Original file
1.5 MB
Text extracted from the city's file for reading and search. Open the original on longbeach.legistar.com. That file is the official record.

CITY OF
LONG
April 5, 2022

HONORABLE MAYOR AND CITY COUNCIL
City of Long Beach
California
RECOMMENDATION:

Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802 (562) 570-6383
R-35
Adopt Plans and Specifications No. R-7177 and award a contract to All American Asphalt, of Corona, CA, for the Market Street Pedestrian and Streetscape Project, in an amount of $7,394,311, authorize a 12.5 percent contingency in the amount of $924,289, for a total contract amount not to exceed $8,318,600; and authorize the City Manager, or designee, to execute all documents necessary to enter into the contract, including any necessary subsequent amendments;
Increase appropriations in the Capital Projects Fund Group in the Public Works Department by $6,071,837, offset by $2,838,000 of State Local Partnership Program Funds (LPP) and $3,233,837 of Federal Congestion Mitigation and Air Quality Improvement Program (CMAQ) funds;
Increase appropriations in the Capital Projects Fund Group in the Public Works Department by $6,071,837, offset by transfer of $2,838,000 State Local Partnership Program Funds and $3,233,837 of Federal Congestion Mitigation and Air Quality Improvement Program funds from the Capital Projects Grant Fund; and, Accept Categorical Exemption CE 21-100. (District 8)

DISCUSSION
City Council approval is requested to enter into a contract with All American Asphalt, for the construction of the Market Street Pedestrian and Streetscape Project (Project).

The Project will implement a series of pedestrian and streetscape improvements along the 2.2- mile length of Market Street, from the Los Angeles River to 800 feet east of Cherry Avenue.

These improvements include new and upgraded decorative street lighting, parkway landscape and hardscape, new street trees, high visibility crosswalks, transit stop enhancements, curb bulb-outs, ADA-compliant curb ramps, sidewalk repairs, driveway repairs, utility relocations, new street furniture, new fiber optic facilities, wayfinding signage, and roadway pavement rehabilitation.

Lane narrowing and roadway reconfiguration between Los Angeles River and Cherry Avenue will slow vehicle speeds and allow for Class 11/111/IV bike lanes and enhanced pedestrian safety.

Additional improvements include rectangular rapid flashing beacons, traffic signal upgrades,

HONORABLE MAYOR AND CITY COUNCIL
April 5, 2022

Page 2 ends

green-painted conflict zones, and bike signing and striping. The Project is consistent with, and was identified in, the City of Long Beach (City) Bicycle Master Plan.

Complete Streets Assessment
Pursuant to Assembly Bill 1358 (the California Complete Streets Act), and as part of the implementation of the Mobility Element of the Long Beach General Plan, the City's practice is to conduct a complete streets assessment for roadway construction projects. The project site is located in North Long Beach and zoned for mixed-use, community commercial automobile­ oriented, and multi-family residential. The Project will generally consist of complete street improvements including Class II/I11/IV bike lanes and other new bike/pedestrian facilities, bulb­ outs, wayfinding signage, crosswalk, and transit stop enhancements, construction and reconstruction of curb ramps for ADA compliance, new and upgraded decorative lighting, flashing beacons, landscaping, and street trees, removing and relocating obstructions and utilities, and street furniture. This infrastructure encourages the use of multi-modes of transportation by motorists, bicyclists, public transit passengers, and pedestrians of all ages and abilities.

This bid was advertised in the Long Beach Press-Telegram on January 28, 2022, and 204 potential bidders specializing in construction services, materials, and supplies were notified of the bid opportunity. Of those bidders, 71 downloaded the bid via the City's electronic bid system. The bid announcement was made available from the Purchasing Division, located on the sixth floor of City Hall, and the Division's website at www.longbeach.gov/purchasing. A bid announcement was also included in the Purchasing Division's weekly update of Open Bid Opportunities, which is sent to 43 local, minority, and women-owned business groups. There were four bids received on March 2, 2022. Of those four bidders, none were Minority-owned Business Enterprises (MBEs), none were Women-owned Business Enterprises (WBEs), one was a certified Small Business Enterprises (SBE), and one was a Long Beach vendor (Local).

All American Asphalt, of Corona, CA, was the lowest responsive and responsible bidder.

Local Business Outreach
To align with the City's outreach goal, Long Beach businesses are encouraged to submit bids for City contracts. The Purchasing Division also assists businesses with registering on the PlanetBids database to download the bid specifications. Through outreach, 11 Long Beach vendors were notified to a submit bids, of which 1 downloaded and 1 submitted a bid. The Purchasing Division is committed to continuing to perform outreach to local vendors to expand the bidder pool.

This matter was reviewed by Deputy City Attorney Erin Weesner-McKinley and Budget Management Officer Nader Kaamous on March 18, 2022, and by Purchasing Agent Michelle Wilson on March 15, 2022.

SUSTAINABILITY
The project will improve the overall mobility and safety along the 2.2-mile corridor for North

HONORABLE MAYOR AND CITY COUNCIL
April 5, 2022

Page 3 ends

Long Beach, providing residents with more recreational and health benefits achieved by walking or cycling. The project will also allow for residents to use bicycles as an alternate mode of transportation, resulting in less vehicle usage and a reduction of air pollution harmful to the environment.

In conformance with the California Environmental Quality Act, Categorical Exemption CE-21- 100 was issued for this project on October 12, 2021 (Attachment B), which the Department of Public Works (Public Works) is asking City Council to accept.

TIMING CONSIDERATIONS
City Council action to adopt Plans and Specifications No. R-7177 and award a contract concurrently is requested on April 5, 2022, to ensure the contract is in place to start construction expeditiously.

FISCAL IMPACT
The total amount of the contract will not exceed $8,318,600, inclusive of a 12.5 percent contingency. The total project cost is estimated at $11,153,381, inclusive of the requested contract, design, construction, construction management, labor compliance, project oversight, and inspections. The project is currently supported by $2,653,163 from the Federal Surface Transportation program (STPL) funding from California Department of Transportation (Caltrans) approved by Los Angeles County Metropolitan Transportation Authority (Metro), $107,451 from AB 2766, $21,000 from Proposition A, $799,930 from Proposition C, $500,000 from Measure R, $200,000 from Measure M, $500,000 from Gas Tax, and $300,000 from Transportation Development Act (TOA), which are currently budgeted in the Capital Projects Fund Group in the Public Works Department. In addition, $2,838,000 in Local Partnership Program Funds (LLP) and $3,233,837 from Federal Congestion Mitigation and Air Quality Improvement Program (CMAQ), of which are being requested within this recommendation. The CMAQ funding requires a 20 percent local match; the STPL funding requires a 33.52 percent local match on construction and no match on construction engineering; and the LPP funding requires a 50 percent match of any other funds in the project. All match requirements are covered by the comprised sources listed previously.

An appropriation increase in the amount of $12,143,674 is requested in the Capital Projects Fund Group in the Public Works Department. Of this amount, $2,838,000 will be offset with LLP and $3,233,837 with CMAQ. The remaining $6,071,837 is a technical appropriation to allow for the transfer of $2,838,000 LPP funds and $3,233,837 CMAQ funds from the Capital Projects Fund Group.

The Public Works' Public Services Bureau will be responsible for ongoing landscape maintenance including irrigation, landscaping, and debris management. Operations and maintenance costs will be absorbed in the existing Public Service Bureau's operating budget.

This recommendation has no staffing impact beyond the normal budgeted scope of duties

HONORABLE MAYOR AND CITY COUNCIL
April 5, 2022

Page 4 ends

and is consistent with existing City Council priorities. The number of additional local jobs created by this project will not be known until the contractors have completed their hiring and construction has commenced.

SUGGESTED ACTION:

Approve recommendation.

Respectfully submitted,
c~c1~

ERIC LOPEZ

DIRECTOR OF PUBLIC WORKS
ATTACHMENTS: A-VICINITY MAP
8-CATEGORICAL EXEMPTION No. CE-21-100
APPROVED:

THOMAS B. MODICA

CITY MANAGER

DEFOREST AVE
AVE
ST

PACIFIC
ST
ST

MOUNTAIN
AVE

E MARKET ST
CEDAR
ST
AVE
CEDAR
59TH ST
LOCUST
55TH
ELLIS
56TH ST

E LOUISE
60TH ST
SILVA
E 5IST
E 53RD
ST
ST

HULLETT
ST
ADAIR
VIA

ATLANTIC
60TH

TERRACE DR
MYRTLE
ORANGE
AVE

CERRITOS

AVE AVE

BRAYTON
SOUTH
ST

FALCONWALNUT
AVE

E MARKET
AVE

WASHINGTON ST
AVE
59TH

CHERRY AVE
AVE

DENMEAD
SILVA

DENMEAD
48TH ST
W 5IST ST
MARKET
DAISY
ZANE
W 52ND ST

W LOUISE ST
BLVD

E DEL
PLATT

ST DAIRY E LOUISE
57TH

DE FOREST AVE
ST
ST
ST
LOCUST
E 49TH ST
ST
ST
ELM
ST
ELM
ST
ST
57TH
SOUTH
NORTON
ST
ST
ST
SILVA
VIA

ALMENDRO
LINDEN
LIME
AVE
AVE
LINDEN

AVE LIME

LEMON AVE
AVE
LEWIS

BENTREE

VIA WANDA
MARKET

CERRITOS AVE CERRITOS AVE
AVE
ST
LEMON

CERRITOS
ORANGE
AVE

WASHINGTON
FALCON
AVE
FALCON
AVE

GAVIOTA
ST
ROSEE 53RD ROSE AVE

HUNGERFORD

ELDERHALL

JACKSON
CHERRY
CHERRY
AVE

TERN BAY
ST

UNION PACIFIC RR
W 47TH ST
AVE
AVE

PACIFIC
AVE
HOME
VIEW

E LOUISE

ST CEDAR
VIEW
ST
ST

LONG BEACH BLVD
ST

ADAIR ST
ST

LURAY ST

ATLANTIC

VIA VERANADA

AVE AVE
55TH
AVE
59TH
VIA
E
LEWIS
AVE
AVE
ORANGE
ORANGE

AVE CERRITOS
AVE

BOYAR AVE
LURAY

MATNEY AVE

BOYAR AVE

E DEL AMO BLVD
ST
57TH
GUNDRY

HUNGERFORD
AVE
ST
60TH
WALNUT

E SAN ANTONIO

HARDWICK ST

PHILLIPS
SOUTH
ST
ST

DEEBOYAR
BLVD

DEEBOYAR AVE

UNION PACIFIC RR

DEERFORD

CANDLEWOOD
OREGON
W 52ND ST

LONG BEACH
ST
W 49TH

W ARBOR

W PLEASANT ST
ST
ELLIS
E
E 53RD

CHESTNUT
57TH ST

JAYMILLS

HULLETT

UNION PACIFIC RR
E 49TH

E PLEASANT
ST
ST
AVE
ST

ST E PLYMOUTH
AVE
DAIRY
ST
AVE
ST
AVE
ST
ST
ELM ST
ST
OLIVE
56TH

AVE LIME
AVE
45TH WAY

AVE CALIFORNIA

BRAYTON

JACKSON ST
ORANGE
ST
ORANGE
AVE
AVE
GUNDRY
GUNDRY

E MARKET
AVE
AVE
AVE
ST
ST

GARDENIA
60TH
CIR

GARDENIA
A
VE

DEL HOLLOW ST
ST
ST

HARDWICK

W DEL AMO
ZANE

W MOUNTAIN
DAISY
AVE
ST
AVE
ST
55TH
BLVD
W 47TH
BEACH
BLVD
AVE
NORTON
ST
E 49TH ST
PINE
LOCUST
ST
AVE ST
JAYMILLS59TH ST
AVE
AMO
SUNSET
PLATT
VIEW
ST
55TH
ST
OSGOOD
AVE
60TH

ATLANTIC AVE
ST

ATLANTIC
ST

CARMELITOS
WANDA
MYRTLE
AVE
AVE
AVE
59TH
ST

BENTREE CIR
AVE
ST
AVE
ORANGE
LEMON
60TH ST
EAST
AVE

MATNEY AVE
AVE
E 52ND ST
55TH
WALNUT
56TH
ST
ST

R A NTON
ST
ST
ROSE
AVE

GARDENIA
CHERRY
ST
ST
AVE

E MARKET

ST SOUTH

CHERRY INDUSTRIAL CIR

CLAIR DEL
AVE
ST
W
W 47TH ST
AVE

VIRGINIA
AVE
W 5IST ST
48TH
E 51ST
E
E 52ND
AVE

OSGOOD ST
E
LOCUST
PEACE
AMO
ST

AVE LOCUST
AVE
AVE

HULLETT ST
ST

E PLEASANT ST
PLENTY

AVE AVE
E 52ND

MORNINGSIDE
ST

E MARKET
56TH
46TH ST

E DEL AMO
BAROLA

ATLANTIC ATLANTIC
LIME
AVE
AVE
OLIVE

RIDGEWOOD ST
BLVD
LEWIS
ST

AVE LEWIS

LEMON AVE

E PLYMOUTH
55TH ST
56TH
AVE
BANNER

GOLDFIELD

BRAYTON

JACKSON
AVE

GAVIOTA AVE
ST

UNION PACIFIC RR
ST
ROGERS

AVE GARDENIA
AVE
BAY
AVE
DOLLAR

LANGPORT AVE
W
W 53RD

PLYMOUTH

VIRGINIA
ST
W

PACIFIC
BLVD
LONG
BEACH
56TH
AVE
ST

LONG BEACH
SUNSET

MORNINGSIDE

PLYMOUTH
AVE
SOUTH
E ARBORE 47TH
BLVD
PINE
AVE
ST
ST
ARBOR
ELM

E DEL
ST
AVE
ST
59TH
ELM
ST

BLVD AVE
LINDEN
OLIVE
LINDEN
SOUTH
AVE

ATLANTIC
ST
46TH ST
ST

CALIFORNIA

CERRITOS
DR

LEMON AVE
E 53RD

SOUTH ST
AVE
ST
SILVA

HARDWICK

MICHELSON
ST
ST
AVE
LURAY

ROSE AVE
ST
55TH ST
56TH ST

GAVIOTA AVE
DR

E DEL AMO
ST
AVE

MEADO WOOD
ST

YEARLING
48TH
AVE
W 49TH

PACIFIC
AVE
BLVD
AVE
ST

E HOME
LONG

E MARKET
ST
ST
ST

E HOME
ST

E MOUNTAIN
AVE
LOCUST

SOUTH ST
ST
ST
AVE
ST
ELM
ST
LINDEN
ELLIS
AVE
ST

LURAY ST
AVE

VIA PASSILO
VIA

E MARKET
AVE
AVE
ST
OLIVE

UNION PACIFIC RR
MYRTLE

CALIFORNIA AVE

E PLYMOUTH ST

AVE MYRTLE

CALIFORNIA
AVE
LEMON
AVE
E 52ND ST
WALNUT

PHILLIPS ST
59TH

WALNUT AVE
ROSE
ST
E 52ND ST

E PLYMOUTH ST AVE
ST
JOHN
AVE
DEL
ST

CHERRY AVE
LN
AVE

ACKERFIELD AVE
ST

LINDSEY

LINDBERGH
HARTE
BARTON
DOOLEY
ADDAMS

SCHERER
LakewoodUNION PACIFIC RR

UNION PACIFIC RR
UNION

PACIFIC
RR
§¨¦710
ADDAMS

POWELL ACADEMY

ST ATHANASIUS

GETHSEMANE
S.E.A. CHARTER
±
FN: Market-Landscape 3/3/2022 mah

MARKET ST PEDESTRIAN & STREETSCAPE ENHANCEMENT PROJECT

FROM THE LOS ANGELES RIVER TO EASTERLY CITY BOUNDARY

PROJECT LIMIT PROJECT LIMIT
Attachment A

ATTACHMENT B

ATTACHMENT B

ATTACHMENT B

ATTACHMENT B

← All documents from this meeting