Artesia Great Boulevard Project
City Council Meeting - October 11, 2022
ARTESIA GREAT BOULEVARD PROJECT
Complete Street Master Plan
✓ Multiple Jurisdictions Regional Footprint
✓ Enhancing Mobility (all Modes)
✓ Traffic Calming
✓ Urban Greening and Enhancement
✓ Sustainability Planning
✓ Stormwater and Urban Runoff
✓ Economic Viability and Visioning
✓ Pedestrian Enhancement and ADA Compliance
✓ Median Improvement and Channelization
✓ Transit Operations
✓ Parking Enhancements
✓ Reduce transportation related greenhouse
gases.
✓ Safe Routes to school plans.
Gateway Cities Complete Street Master Plan
For Artesia Boulevard
The Artesia Boulevard Complete Street Master Plan provides opportunities to revitalize the Corridor through urban design, water quality, higher density mixed use development, improved transit, bike and pedestrian conductivity.
2 ARTESIA GREAT BOULEVARD PROJECT
Project Location and Project Limits
Project
Location
This project will implement a series of Capacity and Complete Street enhancements along an approximately 3-mile length of Artesia Boulevard from Harbor Blvd (east of City of Compton) and Downey Ave (west of City of Bellflower)
3 ARTESIA GREAT BOULEVARD PROJECT
Typical Section
4 ARTESIA GREAT BOULEVARD PROJECT
Project Features
Roadway Improvements
Class IV Bikeway
Bus Stop Improvements
Curb Enhancements
Landscape/Irrigation
Improvements
Bioretention Planters
Traffic Improvements/ITS
Street Furniture
5 ARTESIA GREAT BOULEVARD PROJECT
Vision Concept – Street Character Sketch
6 ARTESIA GREAT BOULEVARD PROJECT
Vision Concept – Street Character Sketch
7 ARTESIA GREAT BOULEVARD PROJECT
Vision Concept – Street Character Sketch
8 ARTESIA GREAT BOULEVARD PROJECT
Vision Concept – Layout Concept at Gundry Avenue and Falcon Avenue 9 ARTESIA GREAT BOULEVARD PROJECT
Vision Concept – Layout Concept at Indiana Avenue
10 ARTESIA GREAT BOULEVARD PROJECT
Vision Concept – Street Furniture
11 ARTESIA GREAT BOULEVARD PROJECT
Vision Concept – Wayfinding Signage – Vertical Gateway Signs East of Gale East of Obispo
12 ARTESIA GREAT BOULEVARD PROJECT
Project Schedule
13 2020
Notice to Proceed
for Design
Jan 2021
Construction
Dec 2022 - Dec 2023
Ribbon Cutting
Dec 2023
2021 2022 2023 2024
Advertise/Bidding
July 2022 – Oct 2022
Final Design
Jan 2021 – June 2022
Groundbreaking
Dec 2022
Award
Oct 2022We Are Here
ARTESIA GREAT BOULEVARD PROJECT
Construction Cost
14 ARTESIA GREAT BOULEVARD PROJECT
Project Summary
First Stretch of Artesia Boulevard within the Gateway Region to be Constructed Increase capacity along Artesia and enhance connectivity between major trip generators and transportation facilities on this key east-west arterial corridor in the gateway Cities COG Improve speed and reliability for east-west general purpose traffic flow in this congested arterial corridor that runs parallel and adjacent to the heavily congested SR-91 Upgrade traffic signals and provide intersection capacity enhancements along Artesia Blvd Improve speed and reliability for buses
Improve safety for pedestrians and bicyclists by reducing pedestrian crossing distance by installing curb bulbs and by installing protected bike lanes along the corridor Artesia Great Blvd
15 Thank you
Eric Lopez
Public Works Director
562.570.5690
[email protected]
16