19. MITIGATION ACTION PLAN

19.1 STATUS OF PREVIOUS PLAN ACTIONS

19.1.1 Mitigation Actions
The 2017 City of Long Beach Hazard Mitigation Plan identified 217 mitigation actions for implementation. These actions were reviewed for the current update, and for each action it was determined whether the action had been completed, was in progress or had not been started.

Incomplete actions were reviewed to determine if they should be carried over to the 2022 update or removed due to changes in priorities, capabilities, or feasibility.

Appendix D lists the status of all 217 actions from the 2017 plan. Of the identified actions, 181 (83 percent) have been started or completed, 10 (5 percent) are carried over to the 2022 update, and 26 (12 percent) have been withdrawn. The reasons for withdrawal of actions ranged from the action no longer being considered feasible to the action being identified in the 2022 planning process as an ongoing core capability.

19.1.2 Plan Incorporation Actions
As a demonstration of progress in local hazard mitigation efforts, 44 CFR 201.6(c)(4)(ii) requires plan updates to describe completed steps to incorporate the mitigation plan into other planning mechanisms as appropriate. The maintenance strategy for the 2017 City of Long Beach Hazard Mitigation Plan called for incorporation into other planning mechanisms. Of the 217 mitigation actions in the 2017 plan, two actions relate to incorporation of the mitigation plan into other planning mechanisms. These actions called for integration in the City’s General Plan and the City’s Emergency Operations Plan. Both of these are ongoing actions.

19.2 ACTION PLAN
The Steering Committee reviewed the collections of hazard mitigation alternatives and selected 44 actions to be included in the hazard mitigation action plan. The selection of actions was based on the risk assessment of identified hazards of concern and the defined hazard mitigation goals and objectives. Table 19-1 lists the recommended hazard mitigation actions that make up the action plan.

City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-2
Table 19-1. Hazard Mitigation Action Plan Matrix
Benefits New or
Existing Assets Objectives Met Estimated Cost Sources of Funding Timelinea Actions Led by Long Beach Development Services (DS)
Action DS-1—Use data from Long Beach Building Resiliency Program study to develop inventory of vulnerable buildings throughout the City.

Hazards Mitigated: Earthquake
Existing 5, 11, 12 25,000 General Fund Short-term
Action DS-2—Review and conduct studies of combined riverine/coastal flooding and increased severity of rainfall events on watershed flooding to understand the potential cumulative impacts.

Hazards Mitigated: Tsunami, Flood, Dam Failure, Severe Weather New and Existing 3, 12, 13 $150,00 Grant Funding (HMGP, BRIC, FMA) Short-term Action DS-3—Update or augment, as necessary, floodplain regulations that address the fact that sea level rise will increase the height of floodwaters and the inland extent of floodplains in Long Beach.

Hazards Mitigated: Tsunami, Flood, Dam Failure, Climate Change, Severe Weather New and Existing 1, 7, 12 $75,000 General Fund Short-term Action DS-4—Enhance and expand urban forest programs for new and existing buildings, streets, and public spaces to improve air quality while reducing extreme heat.

Hazards Mitigated: Climate Change, Severe Weather, Drought New and Existing 3, 8, 12, 14 $250,000 Grant Funding (HMGP, BRIC) Short-term Action DS-5—Update Public Safety Element and Seismic Safety Element of the City’s General Plan, linking this Hazard Mitigation Plan.

Hazards Mitigated: Earthquake, Tsunami, Severe Weather
New and Existing 1, 12 $50,000 General Fund Short-term
Action DS-6—Structure City codes and policies regarding hazard assessments and the regulation of new development with State requirements.

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Sea Level Rise, Severe Weather, Drought New and Existing 6, 7, 8, 12 $12,500 General Fund Short-term Action DS-7—Establish preventive measures for existing development in areas vulnerable to natural hazards.

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Sea Level Rise, Severe Weather, Drought New and Existing 6, 7, 8, 12 $12,500 General Fund Short-term Action DS-8—Maintain supplies and training associated with use of ATC-20 standards (building inspections following disaster).

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Severe Weather New and Existing 3 $50,000 General Fund Short-term
Action DS-9—Implement the adaptation actions identified in the Climate Action and Adaptation Plan to improve the ability of Long Beach and its residents and businesses to adapt to climate change and related impacts now and in the future. Identified impacts include extreme heat, air quality, drought, sea level rise, and flooding New and Existing 1, 3, 7, 10, 11, 12, 14, 16 $75,000 Grant Funding (HMPG, BRIC) Long-term Action DS-10—Continue to maintain good standing and compliance under the NFIP through implementation of floodplain management programs that, at a minimum, meet the NFIP requirements:
• Enforce the flood damage prevention ordinance.
• Participate in floodplain identification and mapping updates. • Provide public assistance/information on floodplain requirements and impacts.

Hazards Mitigated: Flood
New and Existing 4, 6, 7, 8, 15, 16 Low Staff Time, General Funds Short-term City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-3
Benefits New or
Existing Assets Objectives Met Estimated Cost Sources of Funding Timelinea Actions Led by Long Beach Police Department (PD)
Action PD-11—Install or upgrade generators at all police department facilities that are capable of running 100% of the facility’s equipment, lights, etc.

Hazards Mitigated: Earthquake, Tsunami, Flood, Severe Weather Existing 2, 3, 11 $500,000 Grant Funding (HMGP, BRIC) Long-term Action PD-12—Install or upgrade communications technology to include redundancy in normal communications, traditional analog backups, and fixed satellite systems at 400 W Broadway, 3205 Lakewood Blvd, 1835 Santa Fe Ave, 4891 Atlantic, 3800 Willow, 7290 Carson St, and 1400 Canal.

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Climate Change, Severe Weather New and Existing 2, 10 $100,000 Grant Funding (HMGP, BRIC, FMA) Long-term Actions Led by Long Beach Department of Health and Human Services (HHS) Action HHS-13—Assess plans and develop plan/protocol between the City’s health and fire departments to utilize emPOWER data (federal data set of individuals who have medical equipment paid for through Medicaid/Medicare) to prioritize evacuation of individuals with electrical dependent medical equipment
Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Severe Weather New and Existing 1, 3, 10 $100,000 Grant Funding (HMGP, BRIC, FMA) Short-term Action HHS-14—Assess and expand the list of predesignated shelter locations and family assistance/reunification centers Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Severe Weather New and Existing 1, 3, 11, 13, 14 $75,000 Grant Funding (HMGP, BRIC, FMA) Short-term Action HHS-15—Enhance and expand the accessibility of cooling centers for severe weather.

Hazards Mitigated: Climate Change, Severe Weather, Drought Existing 1, 3, 10 $25,000 Grant Funding (HMGP, BRIC) Ongoing Actions Led by Long Beach Energy Resources Department (ER) Action ER-16—Seismic retrofit/replacement of Long Beach Energy Resources buildings 550 and 560.

Hazards Mitigated: Earthquake
Existing 5, 8 $4 M Grant Funding (HMGP, BRIC) Long-term Action ER-17—Back-up generator procurement for the Long Beach Energy Resources 570 building where the call center, dispatch office, and operations center are located.

Hazards Mitigated: Earthquake, Tsunami, Flood, Severe Weather Existing 3, 9 $300,000 Grant Funding (HMGP, BRIC) Long-term Action ER-18—Perimeter protection evaluation of the oil islands for tsunami or other potential high tide events.

Hazards Mitigated: Tsunami, Flood, Dam Failure, Climate Change, Severe Weather New and Existing 5, 11, 12 $100,000 Grant Funding (HMGP, BRIC, FMA) Short-term Action ER-19—Assess and update drainage flows of the oil properties and the Long Beach Energy Resources facility.

Hazards Mitigated: Tsunami, Flood, Dam Failure, Climate Change, Severe Weather Existing 12, 13 $250,000 General Fund Long-term
Actions Led by Long Beach Fire Department (FD)
Action FD-20—Evaluate and develop sustainable emergency food and water storage capabilities (i.e., refrigeration units) and caches (potable water and meals ready-to-eat) for both emergency workers and civilian victims.

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Climate Change, Severe Weather, Drought New 1, 3, 10 $250,000 Grant Funding (HMGP, BRIC, FMA) Long-term Action FD-21—Install or upgrade generators at all fire department facilities that are capable of running 100% of the facility’s equipment, lights, etc.

Hazards Mitigated: Earthquake, Tsunami, Flood, Severe Weather New and Existing 1, 10 $500,000 Grant Funding (HMGP, BRIC) Long-term City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-4
Benefits New or
Existing Assets Objectives Met Estimated Cost Sources of Funding Timelinea Action FD-22—Increase standard shoring capabilities of Fire Department resources by creating an extensive cache of lumber and Paratech equipment, to assist with infrastructure structural shoring capabilities following an earthquake.

Hazards Mitigated: Earthquake
New and Existing 3, 5, 10 $300,000 General Fund Short-term Action FD-23—Evaluate and increase satellite capabilities to store and deliver fuel during fuel shortages/disruptions due to natural disaster.

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Severe Weather New and Existing 5, 10 $50,000 General Fund Long-term
Action FD-24—Evaluate and create continuity plans for communication by developing secondary and tertiary communication plans, including upgrades to radio communications, via towers for UHF, VHF, and digital radio transmissions. Establish a satellite phone cache for emergency usage.

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Climate Change, Severe Weather, Drought New and Existing 2, 11, 15, 16 $25,000 General Fund Short-term Action FD-25—Evaluate and develop a cache of personal protective equipment for City personnel operating in impacted tsunami zones (foul weather gear, waders, boots, etc.)
Hazards Mitigated: Tsunami, Flood, Dam Failure, Severe Weather New and Existing 1, 3 $50,000 Grant Funding (HMGP, BRIC, FMA) Long-term Action FD-26—Increase Fire Department fleet capabilities to incorporate more alternatives to transportation besides fire engines, fire trucks, and fire rescues; to include all-terrain and 4x4 capable vehicles.

New 1, 5 $500,000 Grant Funding (HSGP, HMGP) Long-term
Action FD-27—Evaluate and upgrade fire prevention protocols for building inspections based on climate trends.

Hazards Mitigated: Climate Change, Severe Weather
New and Existing 12 $50,000 General Fund Long-term
Actions Led by Long Beach Water Department (WD)
Action WD-28—Install/Implement an Earthquake Early Warning System at the Long Beach Water Department’s Treatment Plant and Operations Center
Hazards Mitigated: Earthquake
New and Existing 1, 2, 3, 5 $100,000 Grant Funding (HMGP, BRIC) Long-term Action WD-29—The Long Beach Water Department’s Engineering Division will complete a Water Main Lining Pilot Project at Alley East of Cherry between 15th and Pacific Coast Highway, at 15th and Pacific Coast Highway and Sherman Place, and at 17th between Cherry and Alley East of Sherman. This pilot project will use trenchless technology (cast-in-place pipe) to rehabilitate old pipes while reducing the impact of construction and carbon footprint for the duration of materials’ 50-year life expectancy. Findings from the pilot will include a better understanding of the environmental and economic impacts of this new technology.

Hazards Mitigated: Earthquake, Dam Failure, Severe Weather, Flood, Sea Level Rise, Tsunami, Climate Change, Drought New and Existing 5, 10, 11 $3 M General Fund Long-term
Action WD-30—Strengthen raw water intakes to prevent damage from erosion, flood debris, and earthquakes Hazards Mitigated: Earthquake, Tsunami, Flood, Severe Weather New and Existing 5, 11, 13 $1.5 M General Fund Short-term Action WD-31—Enlarge culverts to better handle flood surges Hazards Mitigated: Tsunami, Flood, Dam Failure, Severe Weather Existing 1, 5, 11, 13 $200,000 General Fund Short-term
Action WD-32—Develop Sewer Master Plan. The Long Beach Water Department’s Engineering Division will complete sewer lift station rehabilitation. This type of infrastructure hardening will contribute to sea-level rise resilience as well as operational improvements.

Hazards Mitigated: Tsunami, Climate Change, Severe Weather New and Existing 12, 13 $150,000 Grant Funding (HMGP, BRIC) Short-term City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-5
Benefits New or
Existing Assets Objectives Met Estimated Cost Sources of Funding Timelinea Action WD-33—The Long Beach Water Department’s Engineering Division will complete two new wells at Groundwater Treatment Plant to draw water from the Central Basin. This project will result in increased groundwater protection by reducing reliance on imported water and thereby improving drought resiliency.

Hazards Mitigated: Climate Change, Severe Weather, Drought New and Existing 1, 11, 13 $8 M Grant Funding (HMGP, BRIC) Long-term Action WD-34—The Long Beach Water Department’s Engineering Division will complete new West Coast Basin Well 1 at 2950 Redondo Ave. This project will result in increased groundwater protection by reducing reliance on imported water and thereby improving drought resiliency.

Hazards Mitigated: Climate Change, Severe Weather, Drought New 1, 11, 13 $5 M Grant Funding (HMGP, BRIC) Long-term Action WD-35—The Long Beach Water Department’s Engineering Division will complete rehabilitating two wells: Comm 15 and 18, at Heartwell Park, 6800 E Carson Street. This project will result in increased groundwater protection by reducing reliance on imported water and thereby improving drought resiliency.

Hazards Mitigated: Climate Change, Severe Weather, Drought New 1, 11, 13 $8 M Grant Funding (HMGP, BRIC) Long-term Action WD-36—The Long Beach Water Department’s Engineering Division will complete rehabilitating two wells: Comm 14 and Citizen 10, at Heartwell Park, 2939 Airport Way. This project will result in increased groundwater protection by reducing reliance on imported water and thereby improving drought resiliency.

Hazards Mitigated: Climate Change, Severe Weather, Drought New and Existing 1, 11, 13 $8 M Grant Funding (HMGP, BRIC) Long-term Action WD-37—The Long Beach Water Department’s Water Resources Division will complete a citywide Well Asset Management Plan.

This plan will help inform future groundwater well production, which reduces reliance on imported water and improves drought resiliency.

Hazards Mitigated: Climate Change, Severe Weather, Drought New and Existing 1, 11, 13 $8 M Grant Funding (HMGP, BRIC) Long-term Action WD-38—The Long Beach Water Department’s Water Resources Division will complete Groundwater Augmentation Study. This study will help inform future groundwater well production, which reduces reliance on imported water and improves drought resiliency.

Hazards Mitigated: Climate Change, Severe Weather, Drought New and Existing 1, 11, 13 $8 M Grant Funding (HMGP, BRIC) Long-term Actions Led by Long Beach Public Works Department (PW)
Action PW-39—Complete Westside Storm Drainage Project. To include reinforced concrete box, reinforced concrete pipe storm drain conduit and appurtenances, new catch basins and local depressions.

Hazards Mitigated: Flood, Dam Failure, Severe Weather
New and Existing 1, 5, 12, 13 $10,900,000 Grant Funding (HMGP, BRIC, FMA) Short-term Action PW-40—Olympic Plaza Stormwater Rehabilitation Project. To include resurfacing/re-establishment of center crown along Olympic Plaza, addition of two catch basins, installation of an 18-inch storm drain main, and construction of a trench drainage system. Support to be provided by Los Angeles County.

Hazards Mitigated: Flood, Dam Failure, Severe Weather
New and Existing 1, 5, 13 $640,000 Grant Funding (HMGP, BRIC, FMA) Short-term Action PW-41—Inventory and flood-proof vulnerable sewer pump stations.

Hazards Mitigated: Tsunami, Flood, Dam Failure, Severe Weather New and Existing 1, 10, 12 $300,000 General Fund Short-term Action PW-42—Develop inventory of backup power resources (generators) for critical City facilities Hazards Mitigated: Earthquake, Tsunami, Flood, Severe Weather New and Existing 10, 13 $100,000 Grant Funding (HMGP, BRIC) Short-term Action PW-43—Complete Americans with Disabilities Act building upgrades in City-owned facilities and sidewalks.

Hazards Mitigated: Earthquake, Tsunami, Flood, Dam Failure, Climate Change, Severe Weather New and Existing 1 $500,000 Grant Funding (HMGP, BRIC, FMA) Short-term City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-6
Benefits New or
Existing Assets Objectives Met Estimated Cost Sources of Funding Timelinea Action PW-44—Conduct a local seismic retrofit of 2nd Street Bridge over San Gabriel River and Studebaker Road Bridge over Southern California Edison.

Hazards Mitigated: Earthquake
Existing 1, 3, 5, 6, 8 $42,000,000 GAS, Infrastructure Bill, Grant Funding (HMGP, BRIC) Short-term Action PW-45—Replace Ravenna Rd Bridge over Rivo Alto Canal with a bridge that meets current seismic standards.

Hazards Mitigated: Earthquake
Existing 1, 3, 5, 6, 8 $2,600,000 GAS, Infrastructure Bill, Grant Funding (HMGP, BRIC) Short-term Action Led by Long Beach Airport (AIR)
Action AIR-46—Upgrade the existing generator and electrical systems at Long Beach Airport.

Hazards Mitigated: Earthquake, Tsunami, Flood, Severe Weather Existing 3, 11, 13 $2 M Grant Funding (HMGP, BRIC) Short-term Action Led by Harbor Department of Long Beach (HD)
Action HD-47—Identify, improve, and plan Port Cargo Infrastructure seismic and other hazard retrofit and replacement strategies to oil terminals, cargo facilities, and cargo equipment.

Hazards Mitigated: Earthquake, Tsunami
New and Existing 5, 6, 11, 12 $4,000,000 Grant Funding (HMGP, BRIC) Long-term Actions Led by Disaster Preparedness & Emergency Communications (DP) Action DP-48—Expand public outreach for hazard mitigation and emergency preparedness through use of the City website, social media platforms, and community meetings and events.

Hazards Mitigated: Earthquake, Severe Weather, Tsunami, Climate Change, Cybersecurity Threats, Public Health Incidents, Terrorism New and Existing 2, 4, 8, 10, 12, 13, 15, 16 $100,000 General Fund, Grant Funding (UASI, SHSP, EMPG) Ongoing Action DP-49—Provide equitable access to emergency preparedness information including, availability in multi-lingual formats (including ASL), accommodations for those affected by the technology divide, and targeted outreach for those in historically underserved areas.

Efforts will be tracked internally to ensure compliance.

Hazards Mitigated: Earthquake, Severe Weather, Tsunami, Climate Change, Cybersecurity Threats, Public Health Incidents, Terrorism New and Existing 2, 4, 8, 10, 12, 13, 15, 16 $150,000 General Fund, Grant Funding (UASI, SHSP, EMPG) Ongoing Action DPEC-50—Develop a city-wide evacuation plan to aid in the evacuation of residents and their pets.

Hazards Mitigated: Earthquake, Flood
New and Existing 5, 8, 13 $80,000 Grant Funding (UASI, SHSP, EMPG) Short-term Action DPEC-51—Maintain and expand warning and alert systems to ensure equity and accessibility to all residents.

Hazards Mitigated: Earthquake, Severe Weather, Tsunami, Climate Change, Cybersecurity Threats, Public Health Incidents, Terrorism New and Existing 1, 2, 4, 13 $150,000 Grant Funding (UASI, SHSP, EMPG) Ongoing Action DPEC-52—Ensure all response plans during emergency operations center activations are created with an equity lens: providing supplies, equipment, and personnel to historically vulnerable and underserved areas of the City.

Hazards Mitigated: Earthquake, Dam Failure, Severe Weather, Flood, Tsunami New 1, 5, 13, 16 $50,000 General Fund, Grant Funding (HSGP, HMGP) Ongoing a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with no completion date

19.3 ACTION PLAN PRIORITIZATION
The actions recommended in the action plan were prioritized based on the following factors:
• Cost and availability of funding
• Benefit, based on likely risk reduction to be achieved • Number of plan objectives achieved
City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-7
• Timeframe for project implementation
• Eligibility for grant funding programs
Two priorities were assigned for each action:
• A high, medium, or low priority for implementing the action • A high, medium, or low priority for pursuing grant funding for the action The sections below describe the analysis of benefits and costs and the assignment of the two priority ratings.

19.3.1 Benefit/Cost Review
The action plan must be prioritized according to a benefit/cost analysis of the proposed actions (44 CFR, Section 201.6(c)(3)(iii)). For this hazard mitigation plan, a qualitative benefit-cost review was performed for each action by assigning ratings for benefit and cost as follows:
• Cost:
 High—Existing funding will not cover the cost of the action; implementation would require new revenue through an alternative source (for example, bonds, grants, and fee increases).  Medium—The action could be implemented with existing funding but would require a re- apportionment of the budget or a budget amendment, or the cost of the action would have to be spread over multiple years.
 Low—The action could be funded under the existing budget. The action is part of or can be part of an ongoing existing program.
• Benefit:
 High—Action will provide an immediate reduction of risk exposure for life and property.  Medium—Action will have a long-term impact on the reduction of risk exposure for life and property, or action will provide an immediate reduction in the risk exposure for property.  Low—Long-term benefits of the action are difficult to quantify in the short term.

To assign priorities, each action with a benefit rating equal to or higher than its cost rating (such as high benefit/medium cost, medium benefit/medium cost, medium benefit/low cost, etc.) was considered to be cost-beneficial. This is not the detailed level of benefit/cost analysis required for some FEMA hazard- related grant programs. Such analysis would be performed at the time a given action is being submitted for grant funding.

19.3.2 Implementation Priority
The priority for implementing each action was assigned based on the following definitions:
• High Priority—An action that meets multiple objectives, has benefits that exceed costs, and has a secured source of funding. Action can be completed in the short term (1 to 5 years). • Medium Priority—An action that meets multiple objectives, has benefits that exceed costs, and is eligible for funding though no funding has yet been secured for it. Action can be completed in the short term (1 to 5 years) once funding is secured. Medium-priority actions become high- priority actions once funding is secured.

City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-8
• Low Priority—An action that will mitigate the risk of a hazard, has benefits that do not exceed the costs or are difficult to quantify, has no secured source of funding, and is not eligible for any known grant funding. Action can be completed in the long term (1 to 10 years). Low-priority actions are generally “wish-list” actions. They may be eligible for grant funding from programs that have not yet been identified.

19.3.3 Grant Pursuit Priority
The priority for pursuing grant funding for each action was assigned based on the following definitions:
• High Priority—An action that meets identified grant eligibility requirements, has high benefits, and is listed as high or medium implementation priority; local funding options are unavailable or available local funds could be used instead for actions that are not eligible for grant funding. • Medium Priority—An action that meets identified grant eligibility requirements, has medium or low benefits, and is listed as medium or low implementation priority; local funding options are unavailable.
• Low Priority—An action that has not been identified as meeting any grant eligibility requirements.

19.3.4 Prioritization Summary for Mitigation Actions
Table 19-2 lists the priority of each recommended action.

Table 19-2. Mitigation Action Priority
Action #
# of
Objectives
Met Benefits Costs
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
1 3 Low Low Yes No Yes High Low
2 3 Low High No Yes No Low Medium
3 3 Medium Low Yes No Yes High Low
4 4 Low High No Yes No Low Medium
5 2 Low Low Yes No Yes High Low
6 4 Low Low Yes No Yes High Low
7 4 Low Low Yes No Yes High Low
8 1 Low Low Yes No Yes Low Low
9 8 Low High No Yes No Low Medium
10 6 Low Low Yes No Yes Low Medium
11 3 High High Yes Yes No Medium High
12 2 Medium High No Yes No Low Medium
13 3 Low High No Yes No Low Medium
14 5 Medium High No Yes No Low Medium
15 3 High High Yes Yes No Medium High
16 2 High High Yes Yes No Medium High
17 2 High High Yes Yes No High High
18 3 Low High No Yes No Low Medium
19 2 Low High No Yes No Low Medium
20 3 Medium High No Yes No Low Medium
21 2 High High Yes Yes No Medium High
22 3 Medium Low Yes No Yes High Low
City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-9
Action #
# of
Objectives
Met Benefits Costs
Do Benefits
Equal or
Exceed Cost?
Is Project
Grant-
Eligible?
Can Project Be Funded
Under Existing
Programs/ Budgets?
Implementation
Prioritya
Grant
Pursuit
Prioritya
23 2 Low Low Yes No Yes Medium Low
24 4 Low Low Yes No Yes High Low
25 2 Medium High No Yes No Low Medium
26 2 Low High No Yes No Low Medium
27 1 Medium Low Yes No Yes Low Low
28 4 Medium High No Yes No Low Medium
29 3 Low Low Yes No Yes High Low
30 3 Medium Low Yes Yes Yes High Medium
31 4 Medium Low Yes Yes Yes High Medium
32 2 Low High No Yes No Low Medium
33 3 Medium High No Yes No Low Medium
34 3 Medium High No Yes No Low Medium
35 3 Medium High No Yes No Low Medium
36 3 Medium High No Yes No Low Medium
37 3 Low High No Yes No Low Medium
38 3 Low High No Yes No Low Medium
39 4 Medium High No Yes No Low Medium
40 3 Medium High No Yes No Low Medium
41 3 Medium High No Yes No Low Medium
42 2 Low High No Yes No Low Medium
43 1 Low High No Yes No High Medium
44 5 High High Yes Yes No High Low
45 5 High High Yes Yes No Medium High
46 3 High High Yes Yes No Medium High
47 4 High High Yes Yes No Low High
48 8 Low Low Yes Yes No Medium Medium
49 8 Low Low Yes Yes No Medium Medium
50 3 Low High No Yes No Low Medium
51 4 Medium Medium Yes Yes No Medium Medium
52 4 Low High No Yes No Low Medium
a. See the introduction to this plan for explanation of priorities.

19.4 CLASSIFICATION OF ACTIONS
Each recommended action was classified based on the hazard it addresses and the type of mitigation it involves. Mitigation types used for this classification are as follows:
• Prevention—Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations.
• Property Protection—Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass.

City of Long Beach Hazard Mitigation Plan Mitigation Action Plan 19-10
• Public Education and Awareness—Actions to inform residents and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. • Natural Resource Protection—Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, wetland restoration and preservation, and green infrastructure.
• Emergency Services—Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities.
• Structural Projects—Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. • Climate Resilience—Actions that incorporate methods to mitigate and/or adapt to the impacts of climate change. Includes aquifer storage and recovery activities, incorporating future conditions projections in project design or planning, or actions that specifically address jurisdiction-specific climate change risks, such as sea level rise or urban heat island effect. • Community Capacity Building—Actions that increase or enhance local capabilities to adjust to potential damage, to take advantage of opportunities, or to respond to consequences. Includes staff training, memorandums of understanding, development of plans and studies, and monitoring programs.

Table 19-3 shows the classification based on this analysis.

Table 19-3. Analysis of Mitigation Actions
Action Addressing Hazard, by Mitigation Typea
Hazard
Type Prevention
Property
Protection
Public
Education &
Awareness
Natural
Resource
Protection Emergency Services
Structural
Projects
Climate
Resilience
Community
Capacity
Building
High-Risk Hazards
Earthquake 6, 7, 50 16, 43, 44,
45, 46
47, 48 8, 11, 12, 13, 14, 17, 120,
21, 22, 23, 26, 28, 46, 51, 52
29, 30 1, 5, 13, 24,
41, 48, 49, 50
Medium-Risk Hazards
Dam Failure 3, 6, 7 40, 43 8, 12, 13, 14, 20, 23, 25, 26, 52 19, 29, 31,
39, 40
2, 13, 18, 24
Severe
Weather
3, 6, 7, 9,
25 41, 43 48, 49 8, 11, 12, 13, 14, 15, 16, 20,
21, 23, 25, 26, 46, 51, 52
19, 29, 30,
31, 32, 39,
40 4, 33, 34,
35, 36
2, 4, 5, 9, 18,
12, 24, 32, 37,
38, 42, 48, 49
Low-Risk Hazards
Drought 6, 7 15, 20 26, 29 4, 33, 34,
35, 36
4, 25, 37, 38
Flood 3, 6, 7, 8,
50 41, 43 10 8, 11, 12, 13, 14, 17, 20, 21,
23, 25, 26, 46, 52
19, 29, 30,
31, 39, 40
2, 10, 13, 18,
24, 42, 50
Sea Level
Rise
6, 7 29
Tsunami 3, 6, 7 41, 43, 47 48, 49 8, 11, 12, 13, 14, 17, 20, 21, 23, 25, 26, 46, 51, 52
19, 29, 30,
31, 32
2, 5, 13, 18,
25, 32, 42, 48,
49 20-1

20. PLAN ADOPTION, IMPLEMENTATION AND MAINTENANCE

20.1 PLAN ADOPTION
A hazard mitigation plan must document that it has been formally adopted by the governing body of the jurisdiction requesting federal approval of the plan (44 CFR Section 201.6(c)(5)). DMA compliance and its benefits cannot be achieved until the plan is adopted. This plan was submitted for a pre-adoption review to Cal OES and FEMA prior to adoption. Once pre-adoption approval was provided, the City of Long Beach formally adopted the plan. A copy of the resolution is provided in Appendix E.

20.2 PLAN IMPLEMENTATION
The effectiveness of the hazard mitigation plan depends on its implementation and the incorporation of its action items into existing local plans, policies, and programs. Together, the action items in the plan provide a framework for activities that the City of Long Beach can implement over the next five years.

The planning team and the Steering Committee have established goals and objectives and have prioritized mitigation actions that will be implemented through existing plans, policies, and programs.

The City of Long Beach Department of Disaster Preparedness and Emergency Communications will have lead responsibility for overseeing the plan implementation and maintenance strategy. Plan implementation and evaluation will be a shared responsibility among all agencies identified as lead agencies in the mitigation action plan.

20.3 PLAN MAINTENANCE
Plan maintenance is the formal process for achieving the following:
• Ensuring that the hazard mitigation plan remains an active and relevant document and that the City maintains its eligibility for applicable funding sources • Monitoring and evaluating the plan annually and producing an updated plan every five years • Integrating public participation throughout the plan maintenance and implementation process • Incorporating the mitigation strategies outlined in this plan into existing planning mechanisms and programs, such as any relevant comprehensive land-use planning process, capital improvement planning process, and building code enforcement and implementation To achieve these ends, a hazard mitigation plan must present a plan maintenance process that includes the following (44 CFR Section 201.6(c)(4)):

City of Long Beach Hazard Mitigation Plan Plan Adoption, Implementation and Maintenance 20-2
• A method and schedule for monitoring, evaluating, and updating the mitigation plan within a 5- year cycle
• An approach for how the community will continue public participation in the plan maintenance process
• A process by which local governments will incorporate the requirements of the mitigation plan into other planning mechanisms, such as comprehensive or capital improvement plans, when appropriate
Table 20-1 summarizes the plan maintenance strategy. The sections below further describe each element.

Table 20-1. Plan Maintenance Matrix
Approach Timeline Lead Responsibility
Integration into Other Planning Mechanisms
Create a linkage between the hazard mitigation plan and the City’s general plan or similar plans identified in the core capability assessments
Continuous over the 5-year
performance period of the plan
City of Long Beach
Planning Department
Plan Monitoring
Track the implementation of actions over the performance period of the plan
Continuous over the 5-year
performance period of the plan
Department of Disaster
Preparedness and
Emergency
Communications
Plan Evaluation
Review the status of previous actions; assess changes in risk; evaluate success of integration
Upon initiation of hazard mitigation plan
update, comprehensive general plan
update, or major disaster
Department of Disaster
Preparedness and
Emergency
Communications
Grant Monitoring and Coordination
As grant opportunities present themselves, the City will consider options to pursue grants to fund actions identified in this plan
As grants become available Department of Disaster
Preparedness and
Emergency
Communications
Plan Update
Begin the process, at a minimum, every 5 years to develop a comprehensive update of the plan.

Every 5 years or upon comprehensive
update to General Plan or major
disaster; funding and organizing for
plan update will begin in FY 2026/2027
Department of Disaster
Preparedness and
Emergency
Communications
Continuing Public Participation
Keep a website maintained, hold public meeting review once a year (these meetings are also televised and on public notices in community newspaper), and receive comments through the
website. The website and comments will be maintained over the course of the plan.

Continuous over the 5-year
performance period of the plan
Department of Disaster
Preparedness and
Emergency
Communications

20.3.1 Integration with Other Planning Mechanisms
It is the intent of the City of Long Beach to fully integrate the hazard mitigation plan into existing plans and programs, such as comprehensive land-use planning processes, capital improvement planning, and building enforcement implementation. The hazard mitigation plan’s format allows sections to be City of Long Beach Hazard Mitigation Plan Plan Adoption, Implementation and Maintenance 20-3
reviewed and updated as new data becomes available, resulting in a plan that remains current and relevant.

The City of Long Beach, through adoption of a General Plan and zoning ordinance, has planned for the impact of natural hazards. The process of updating this hazard mitigation plan provided the opportunity to review and expand on policies in these planning mechanisms. The information on hazard, risk, vulnerability, and mitigation contained in this hazard mitigation plan is based on the best science and technology available at the time this plan was prepared. The General Plan and the hazard mitigation plan are complementary documents that work together to achieve the goal of reducing risk exposure.

The General Plan is an integral part of this plan. An update to the General Plan may trigger an update to the hazard mitigation plan.

The City of Long Beach will create a linkage between the hazard mitigation plan and the General Plan by identifying a mitigation action as such and giving that action a high priority. Other planning processes and programs to be coordinated with the recommendations of the hazard mitigation plan include the following:
• City of Long Beach General Plan
• Climate action/Adaptation plans
• Resilience plans
• Recovery plan
• Emergency response plans
• Capital improvement programs
• Municipal codes
• Community design guidelines
• Water-efficient landscape design guidelines
• Stormwater management programs
• Water system vulnerability assessments
• Master fire protection plans
Some action items do not need to be implemented through regulation. Instead, these items can be implemented through the creation of new educational programs, continued interagency coordination, or improved public participation. As information becomes available from other planning mechanisms that can enhance this plan, that information will be integrated via the update process.

20.3.2 Plan Monitoring
The City of Long Beach Department of Disaster Preparedness and Emergency Communications will be the lead agency responsible for monitoring the plan by tracking the status of all recommended mitigation actions in the action plan.

City of Long Beach Hazard Mitigation Plan Plan Adoption, Implementation and Maintenance 20-4

20.3.3 Plan Evaluation
The plan will be evaluated by how successfully the implementation of identified actions has helped to achieve the goals and objectives identified of the plan. This will be assessed by a review of the changes in risk that occur over the performance period and by the degree to which mitigation goals and objectives are incorporated into existing plans, policies and programs. Plan evaluation will be the responsibility of the City of Long Beach Department of Disaster Preparedness and Emergency Communications . The Long Beach Mayor and City Council may recommend changes to the hazard mitigation plan based on evaluation findings.

20.3.4 Midterm Progress Report
Completion of a midterm progress report would be an effective tool to position the City for future updates. This report will provide the City with a streamlined approach for fulfilling update requirements delineated in 44 CFR 201.6(d)(3) during the next plan update initiative. Any trigger of a comprehensive update to the City of Long Beach Hazard Mitigation Plan as described in Section 20.3.6 will require completion of a performance period progress report.

The objective of the progress report will be to evaluate the progress of individual actions at the midterm of the performance period of this plan. The progress report will be completed two and a half years from the date of plan approval by FEMA, or upon initiation of an accelerated plan update as described under Section 20.3.6, whichever occurs first. The review will include the following:
• Summary of any hazard events that occurred during the performance period and the impact these events had on the planning area
• Review of mitigation success stories
• Review of continuing public involvement
• Brief discussion about why targeted strategies were not completed • Reevaluation of the action plan to determine if the timeline for identified projects needs to be amended (such as changing a long-term project to a short-term one because of new funding) • Recommendations for new projects
• Changes in or potential for new funding options (grant opportunities) • Impact of any other planning programs or initiatives that involve hazard mitigation The City has created a template to guide its departments in preparing a progress report (see Appendix F). This report will be used as follows:
• Posted on a website dedicated to the hazard mitigation plan • Provided to the local media through a press release
• Presented to City Council to inform council members of the progress of actions implemented during the reporting period
Progress reporting is not a requirement specified under 44 CFR. However, it may enhance the City’s opportunities for funding. While failure to implement this component of the plan maintenance strategy City of Long Beach Hazard Mitigation Plan Plan Adoption, Implementation and Maintenance 20-5
will not jeopardize the City’s compliance under the DMA, it may jeopardize its opportunity to partner and leverage funding opportunities with other stakeholders within the planning area.

20.3.5 Grant Monitoring and Evaluation
The City of Long Beach Department of Disaster Preparedness and Emergency Communications will identify grant funding opportunities. Once these opportunities are identified, City agency stakeholders will convene in a short meeting to review the hazard mitigation plan and pursue a strategy to capture that grant funding. The Department of Disaster Preparedness and Emergency Communications will assume lead responsibility for planning and facilitating grant opportunity meetings. Review of the hazard mitigation plan at these meetings can include the following:
• Discussion of any hazard events that occurred during the prior year and their impact on the planning area
• Impact of potential grant opportunities on the implementation of mitigation actions • Re-evaluation of the action plans to determine if the timeline for identified actions needs to be amended (such as changing a long-term action to a short-term action because of funding availability)
• Recommendations for new actions
• Impact of any other planning programs or initiatives that involve hazard mitigation

20.3.6 Plan Update
FEMA requires the hazard mitigation plan to be revised and resubmitted for review and approval by Cal OES and FEMA prior to the five-year anniversary date of the plan’s adoption in order to remain eligible for benefits under the DMA (44 CFR, Section 201.6(d)(3)). To meet this timeline, the Department of Disaster Preparedness and Emergency Communications will implement the Steering Committee’s plan revision process at least one year prior to the anniversary date of the adoption. This cycle may be accelerated to less than five years based on the following triggers:
• A federal disaster declaration that impacts the City of Long Beach • A hazard event that causes loss of life
• A comprehensive update of the City of Long Beach general plan The hazard mitigation plan five-year revision will, at a minimum, include the following elements:
• The revision process will be convened through a new steering committee • The hazard risk assessment will be reviewed and, if necessary, revised using best available information and technologies
• The action plan will be reviewed for any actions completed, ongoing, or withdrawn, and will be reconciled to account for changes in the risk assessment or new policies identified under other plans (such as the general plan)
• The draft plan revision will be sent to appropriate departments and divisions for comment • The public will be given an opportunity to comment on the revised plan prior to adoption City of Long Beach Hazard Mitigation Plan Plan Adoption, Implementation and Maintenance 20-6
• The Long Beach City Council will adopt the updated plan once the reviews by Cal OES and FEMA have been conducted

20.3.7 Continuing Public Involvement
The public will continue to be apprised of the plan’s progress through a City website and by providing copies of biennial progress reports on the City website and through posting them in locations throughout the City for the public to review. The website will house the final plan and provide information regarding the plan, plan implementation, and the beginning of the revision process. Copies of the plan will be distributed to local libraries. Upon initiation of future update processes, a new public involvement strategy will be initiated based on guidance from a new steering committee. This strategy will be based on the needs and capabilities of the City of Long Beach at the time of the update. At a minimum, this strategy will include the use of local media outlets within the planning area.

References-1

REFERENCES
Bilodeau, William L, Sally W Bilodeau, Eldon M Gath, Mark Oborne, and Richard J Proctor. 2007. "Geology of Los Angeles, California, United States of America." Environmental and Engineering Geoscience 13 (2): 99-160.

Brown, William M. III, David M. Perkins, Edgar V. Leyendecker, Arthur D. Frankel, James W. II Hendley, and Peter H. Stauffer. 2001. Hazard Maps Help Save Lives and Property. July. Accessed April 6, 2022. https://pubs.usgs.gov/fs/1996/fs183-96/fs183-96.pdf.

Cal OES. 2021. Dam Safety Planning Division. Accessed November 17, 2021. https://www.caloes.ca.gov/cal-oes-divisions/hazard-mitigation/dam-safety-planning-division.

California Air Resources Board. 2022. Current California GHG Emission Inventory Data. Accessed April 7, 2022. https://ww2.arb.ca.gov/ghg-inventory-data.

California Air Resources Board. 2016. Determination of Total Methane Emissions from the Aliso Canyon Natural Gas Leak Incident. California Air Resources Board.

California Department of Conservation. 2019. Earthquakes and Faults. Accessed November 19, 2021. https://www.conservation.ca.gov/cgs/earthquakes.

California Department of Water Resources. 2022. Climate Change and Water. Accessed April 8, 2022. https://water.ca.gov/Programs/All-Programs/Climate-Change-Program/Climate-Change-and-Water.

California Department of Water Resources. 2022. Division of Safety of Dams. Accessed April 7, 2022. https://water.ca.gov/programs/all-programs/division-of-safety-of-dams.

California Energy Commission. 2020. California Natural Gas Pipelines. October. Accessed May 17, 2022. https://www.energy.ca.gov/sites/default/files/2020-10/Natural_Gas_Pipelines_ADA.pdf.

California Office of Environmental Health Hazard Assessment. 2018. Indicators of Climate Change in California. California Environmental Protection Agency.

CDC. 2020. Health Implications of Drought. January 16. Accessed April 6, 2022. https://www.cdc.gov/nceh/drought/implications.htm.

CDC. 2013. Lightning: Victim Data. December 23. Accessed April 7, 2022. https://www.cdc.gov/disasters/lightning/victimdata.html.

City of Long Beach Hazard Mitigation Plan References
Reference-2
Center for Western Weather and Water Extremes. n.d. Forecast Informed Reservoir Operations.

Accessed April 8, 2022. https://cw3e.ucsd.edu/firo/.

City of Long Beach. 2021. City of Long Beach. Accessed November 2021. https://www.longbeach.gov/civilservice/job-opportunities/major-local-employers/.

City of Long Beach. 2010. "City of Long Beach." City of Long Beach. June 22. Accessed December 6, 2021. https://www.longbeach.gov/globalassets/lbds/media-library/documents/planning/historic- preservation/historic-pres-docs/final-long-beach-historic-preservation-element_6-22-2010.

City of Long Beach. 2017. "City of Long Beach Local Hazard Mitigation Plan." Hazard Mitigation Plan, City of Long Beach.

City of Long Beach. 2021. "Development Services." CIty of Long Beach. Accessed January 2022. https://www.longbeach.gov/lbds/news-archive/2021/update-on-construction-near-oilgas-wells-and- methane-gas-mitigation/.

City of Long Beach. n.d. Flood Hazards/Flood Zone Information. Accessed December 2021. https://www.longbeach.gov/pw/resources/flood-zone/.

City of Long Beach General Plan. 2004. Public Safety Element, City Planning Department, City of Long Beach. Accessed April 5, 2022. https://www.longbeach.gov/globalassets/lbds/media- library/documents/planning/advance/general-plan/public-safety.

City of Long Beach. 2021. The Long Beach Municipal Urban Stormwater Treatment Project. Accessed January 2022. https://longbeach.gov/pw/projects/lbmust/.

Code of Federal Regulations. 2022. Definitions. May 16. Accessed May 17, 2022. https://www.ecfr.gov/current/title-49/subtitle-B/chapter-VIII/part-830/subpart-A/section-830.2.

Conrad, James E, Katherine L Maier, Charles K Paull, Mary McGann, and David W Caress. 2015. "The Palos Verdes Fault offshore Southern California: Late Pleistocene to present tectonic geomorphology, seascape evolution, and slip rate estimate based on AUV and ROV surveys." JGR Solid Earth.

County of Los Angeles Public Health. n.d. COVID-19: Reducing Risk Keeping Safe and Preventing Spread. Accessed May 18, 2022. http://publichealth.lacounty.gov/acd/ncorona2019/reducingrisk/.

County of Marin. 2018. "Marin County Multi-Jurisdiction Local Hazard Mitigation Plan." Accessed 2021. https://www.marinwatersheds.org/sites/default/files/2020-07/Marin%20County%20Multi- Jurisdictional%20Local%20Hazard%20Mitigation%20Plan%202018.pdf.

Dunbar, Paula K., and Craig S. Weaver. 2015. U.S. States and Territories National Tsunami Hazard Assessment: Historical record and sources for waves – Update. Accessed April 7, 2022. https://pubs.er.usgs.gov/publication/70159744.

Energy Research and Development Division. 2020. Quantifying Methane from California's Plugged and Abandoned Oil and Gas Wells. Division Report, California Energy Commission.

City of Long Beach Hazard Mitigation Plan References
References-3
Environmental Journal. 2021. How lightning is affected by climate change. January 11. Accessed April 8, 2022. https://environmentjournal.online/articles/the-future-is-not-forecast-how-lightning-is-affected- by-climate-
change/#:~:text=As%20CO2%20increases%20and%20the,a%205%25%20increase%20in%20lightning .

Erdman, Jonathan. 2021. America's No. 1 Weather Killer Is Not Tornados, Flooding, Lightning or Hurricanes. June 3. Accessed April 17, 2022. https://weather.com/safety/heat/news/2021-06-03-heat- america-fatalities.

FEMA. 2016. Be Aware of Potential Risk of Dam Failure in Your Community. August. Accessed November 17, 2022. https://www.fema.gov/sites/default/files/2020-08/fema_dam-safety_aware- community_fact-sheet_2016.pdf.

FEMA. n.d. Chapter 2 Types of Floods and Floodplains. Accessed April 6, 2022. https://training.fema.gov/hiedu/docs/fmc/chapter%202%20- %20types%20of%20floods%20and%20floodplains.pdf.

FEMA. 2022. Declared Disasters. Accessed March 14, 2022. https://www.fema.gov/disaster/declarations?field_dv2_state_territory_tribal_value=TXandfield_year_val ue=Allandfield_dv2_declaration_type_value=Allandfield_dv2_incident_type_target_id_selective=49118.

FEMA. 2021. Features of Flood Insurance Rate Maps in Coastal Areas. May 24. Accessed April 6, 2022. https://www.fema.gov/flood-maps/coastal/insurance-rate- maps#:~:text=Limit%20of%20Moderate%20Wave%20Action%20(LiMWA)andtext=The%20LiMWA%20 marks%20the%20inland,during%20a%20base%20flood%20event.

FEMA. 2021. Using the Limit of Moderate Wave Action to Build Resilient Coastal Communities. May.

Accessed April 6, 2022. https://www.fema.gov/sites/default/files/documents/fema_using-limit-oderate- wave-action_fact-sheet_5-24-2021.pdf.

Inside Climate News. 2021. With a Warming Climate, Coastal Fog Around the World Is Declining.

October 10. Accessed April 8, 2022. https://insideclimatenews.org/news/10102021/coastal-fog-global- warming/.

Kang, Mary, Yuhan Dong, Yajing Liu, James P Williams, Peter M J Douglas, and Jeffrey M McKenzie. 2019. "Potential increase in oil and gas well leakage due to earthquakes." Environmental Research Communications.

Keim, Mark. 2021. Disaster Doc. June 28. Accessed December 2021. https://disasterdoc.org/when- buildings-collapse/.

LA County OEM. 2006. Los Angeles County Operational Area Emergency Response Plan Tsunami Annex. March 29. Accessed April 7, 2022. https://ceo.lacounty.gov/wp- content/uploads/OEM/Tsunami%20Annex.pdf.

City of Long Beach Hazard Mitigation Plan References
Reference-4
LB Report. 2019. Intense Microburst/Tornadic-Like Winds Hit ELB's Artcraft Manor Neighborhood; Wires And Trees Downed In Multiple Parts of LB. February 2. Accessed April 7, 2022. https://www.lbreport.com/news/feb19/rainwind.htm.

Leon, Lorraine A, James F Dolan, John H Shaw, and Thomas L Pratt. 2009. "Evidence for large Holocene earthquakes on the Compton thrust fault, Los Angeles, California." Journal of Geophysical Research; Solid Earth (AGU) 114 (B12).

Leon, Lorraine A, James F Dolan, John H Shaw, and Thomas L Pratt. 2009. "Evidence for large Holocene earthquakes on the Compton thrust fault, Los Angeles, California." Journal of Geophysical Research (Journal of Geophysical Research).

Los Angeles Times. 1994. EARTHQUAKE / THE ROAD TO RECOVERY : Seismic Experts Differ on Pacoima Dam : Temblor: Caltech professor says it might not have held if full. Officials marvel at massive ground motions. March 4. Accessed April 5, 2022. https://www.latimes.com/archives/la-xpm- 1994-03-04-me-30097-story.html.

Los Angeles Times. 2021. Study shows dramatic decline in effectiveness of all three COVID-19 vaccines over time. November 4. Accessed May 18, 2022. https://www.latimes.com/science/story/2021- 11-04/study-shows-dramatic-decline-in-effectiveness-of-covid-19-vaccines.

Mesmer, Louis. 1903. Soil Survey of the Los Angeles Area, California. Accessed January 2021. https://www.nrcs.usda.gov/Internet/FSE_MANUSCRIPTS/california/losangelesCA1903/losangelesCA1 903.pdf
Mount, Jeffrey, Alvar Escriva-Bou, and Gokce Sencan. 2021. Droughts in California. April. Accessed April 8, 2022. https://www.ppic.org/publication/droughts-in-california/.

NASA. 2022. Carbon Dioxide. February. Accessed April 7, 2022. https://climate.nasa.gov/vital- signs/carbon-dioxide/.

National Aeronautics and Space Administration. 2019. Can Climate Affect Earthquakes, Or Are the Connections Shaky? October 29. Accessed April 8, 2022. https://climate.nasa.gov/news/2926/can- climate-affect-earthquakes-or-are-the-connections-shaky/.

National Aeronautics and Space Administration. 2022. Climate Change: How Do We Know? March 23.

Accessed April 7, 2022. https://climate.nasa.gov/evidence/.

National Aeronautics and Space Administration. 2022. The Effects of Climate Change. March 23.

Accessed April 7, 2022. https://climate.nasa.gov/effects/.

National Centers for Environmental Information. n.d. NCEI/WDS Global Historical Tsunami Database.

Accessed December 2021. https://www.ngdc.noaa.gov/hazel/view/hazards/tsunami/runup- data?regionCode=88andsourceMaxYear=2021andarea=CAandsourceMinYear=1850andcountry=USA andlocInclude=Long%20Beach.

City of Long Beach Hazard Mitigation Plan References
References-5
National Climatic Data Center. 2022. NOAA National Centers for Environmental Information National Oceanic and Atmospheric Administration Storm Events Database. . Accessed April 7, 2022. https://www.ncdc.noaa.gov/stormevents/.

National Drought Mitigation Center. 2022. Drought Basics. Accessed April 6, 2022. https://drought.unl.edu/Education/DroughtBasics.aspx.

National Drought Mitigation Center. 2022. Impacts Advanced Search. Accessed April 6, 2022. https://droughtreporter.unl.edu/advancedsearch/impacts.aspx.

National Integrated Drought Information System. 2022. Current Conditions for Los Angeles County.

April 5. Accessed April 5, 2022. https://www.drought.gov/location/Long%20Beach%2C%20California.

National Oceanic and Atmospheric Administration. 2022. Climate Change: Global Sea Level. February

16. Accessed April 7, 2022. https://www.climate.gov/news-features/understanding-climate/climate- change-global-sea-level.

National Tsunami Warning Center. 2021. Tsunami Frequently Asked Questions. November 19.

Accessed November 22, 2021. https://www.tsunami.gov/?page=tsunamiFAQ.

National Weather Service. 2009. Flood Categories. June 25. Accessed April 6, 2022. https://w1.weather.gov/glossary/index.php?word=flood+categories.

National Weather Service. 2009b. National Weather Service Glossary. Accessed November 22, 2021. https://w1.weather.gov/glossary/.

NOAA. n.d. NCEI Tsunami Travel Times to Coastal Locations Viewer. Accessed April 7, 2022. https://www.ncei.noaa.gov/maps/ttt_coastal_locations/.

NOAA. n.d. Severe Weather 101 - Floods . Accessed April 6, 2022. https://www.nssl.noaa.gov/education/svrwx101/floods/.

NOAA. n.d. Severe Weather 101 - Thunderstorms. Accessed November 24, 2021. https://www.nssl.noaa.gov/education/svrwx101/thunderstorms/.

Norris, Robert M, and Robert W Webb. 1990. Geology of California, second edition. John Wiley and Sons, Inc.

NWS. n.d. Beaufort Wind Scale. Accessed April 7, 2022. https://www.weather.gov/mfl/beaufort.

Olalde, Mark, and Ryan Menezes. 2020. "Deserted oil wells haunt Los Angeles with toxic fumes and enormous cleanup costs." Los Angeles Times. March 6. Accessed December 2021. https://www.latimes.com/environment/story/2020-03-05/deserted-oil-wells-los-angeles-toxic-fumes- cleanup-costs.

Pipeline and Hazardous Materials Safety Administration. 2022. Pipeline Miles and Facilities. May 17.

Accessed May 17, 2022.

City of Long Beach Hazard Mitigation Plan References
Reference-6
https://portal.phmsa.dot.gov/analytics/saw.dll?PortalpagesandPortalPath=%2Fshared%2FPDM%20Pu blic%20Website%2F_portal%2FPublic%20ReportsandPage=Infrastructure.

Press-Telegram. 2018. Gust of wind topples tree into Long Beach home; five people escape through window. January 9. Accessed April 7, 2022. https://www.presstelegram.com/2018/01/09/gust-of-wind- topples-tree-into-long-beach-home-five-people-escape-through-window/.

Randell, David H, Jeffry B Reardon, James A Hileman, Trevor Matuschka, George C Liang, Alexander I Khan, and John Laviolette. 1983. "Geology of the City of Long Beach, California, United States of America." Environmental and Engineering Geoscience 9-94.

Sarkar, Subharthi, and Rajib Maity. 2020. "Estimation of Probable Maximum Precipitation in the context of climate change." Methods X.

Science. 2021. California's fire-fanning Santa Ana winds may not get any better with climate change.

June 18. Accessed April 8, 2022. https://www.science.org/content/article/california-s-fire-fanning-santa- ana-winds-may-not-get-any-better-climate-change.

Shaw, John H, and John Suppe. 1996. "Earthquake hazards of active blind-thrust faults under the central Los Angeles basin, California." Journal of Geophysical Research Atmospheres (Journal of Geophysical Research Atmospheres).

Southern California Earthquake Data Center. n.d. Accessed December 2021. https://scedc.caltech.edu/earthquake/elsinore.html.

Southern California Earthquake Data Center. n.d. Earthquake Information. Accessed December 2021. https://scedc.caltech.edu/earthquake/newport.html.

Southern California Earthquake Data Center. n.d. Earthquake Information. Accessed January 2022. https://scedc.caltech.edu/earthquake/palosverdes.html.

Southern California Earthquake Data Center. 2022. Southern California Seismic Network Earthquake Updates. Accessed April 6, 2022. https://scedc.caltech.edu/.

Stanford University. 2018. Dam Failures in the U.S. September. Accessed April 5, 2022. http://npdp.stanford.edu/sites/default/files/reports/npdp_dam_failure_summary_compilation_v1_2018.p df.

State of California. 2022. California’s Fourth Climate Change Assessment. Accessed April 7, 2022. https://www.climateassessment.ca.gov/state/overview/.

Tamrazian, Arbi, Steve LaDocky, Josh Willis, and William C. Patzert. 2008. Heat Waves in Southern California: Are They Becoming More Frequent and Longer Lasting? Accessed April 7, 2022. https://www.jstor.org/stable/24043289.

The Real Deal. 2021. "LA County turns attention to aging buildings following Surfside collapse." The Real Deal. July 15. Accessed January 2022. https://therealdeal.com/la/2021/07/15/la-county-turns- attention-to-aging-buildings-like-miamis-collapsed-surfside-tower/.

City of Long Beach Hazard Mitigation Plan References
References-7
The White House. 2022. National COVID-19 Preparedness Plan. Accessed May 18, 2022. https://www.whitehouse.gov/covidplan/.

U.S. Army Corps of Engineers. 2020. National Inventory of Dams. Accessed November 26, 2021. https://nid.usace.army.mil/#/.

U.S. Army Corps of Engineers. 2016. National Levee Database. Accessed April 6, 2022. https://levees.sec.usace.army.mil/#/.

U.S. Army Corps of Engineers. 2014. Using HEC-RAS for Dam Break Studies. August. Accessed April 5, 2022. https://www.hec.usace.army.mil/publications/TrainingDocuments/TD-39.pdf.

U.S. Climate Resilience Toolkit. 2021. Drought. September 28. Accessed April 8, 2022. https://toolkit.climate.gov/topics/water/drought.

U.S. Geological Survey. 2021. Earthquake Magnitude, Energy Release, and Shaking Intensity.

Accessed April 6, 2022. https://www.usgs.gov/natural-hazards/earthquake- hazards/science/earthquake-magnitude-energy-release-and-shaking-intensity?qt- science_center_objects=0#qt-science_center_objects.

UN Environment Programme. 2021. August 20. Accessed January 2022. https://www.unep.org/news- and-stories/story/methane-emissions-are-driving-climate-change-heres-how-reduce-them.

UNESCO. 2007. Tsunami Glossary. Accessed April 7, 2022. https://www.gitews.org/tsunami- kit/en/E5/further_resources/Tsunami%20Glossary.pdf.

USGS. 2018. 2018 Long-term National Seismic Hazard Map. Accessed April 6, 2022. https://www.usgs.gov/media/images/2018-long-term-national-seismic-hazard-map.

USGS. 2018. ARkStorm Scenario. January 23. Accessed April 6, 2022. https://www.usgs.gov/programs/science-application-for-risk-reduction/science/arkstorm-scenario?qt- science_center_objects=0.

USGS. 2021. ShakeMap. Accessed April 6, 2022. https://earthquake.usgs.gov/data/shakemap/.

USGS. 2011. ShakeMap Scientific Background. March 9. Accessed April 6, 2022. https://web.archive.org/web/20110623092131/http://earthquake.usgs.gov/earthquakes/shakemap/back ground.php#intmaps.

USGS. 2021. The Modified Mercalli Intensity Scale. Accessed April 6, 2022. https://www.usgs.gov/natural-hazards/earthquake-hazards/science/modified-mercalli-intensity-scale?qt- science_center_objects=0#qt-science_center_objects.

USGS. 2018. "USGS." Coastal cliffs from Santa Barbara to San Diego might crumble at more than twice the historical rate by the year 2100 as sea levels rise. July 9. Accessed January 2022. https://www.usgs.gov/news/national-news-release/sea-level-rise-could-double-erosion-rates-southern- california-coastal.

City of Long Beach Hazard Mitigation Plan References
Reference-8
USGS. n.d. What is the probability that an earthquake will occur in the Los Angeles Area? In the San Francisco Bay area? . Accessed April 6, 2022. https://www.usgs.gov/faqs/what-probability-earthquake- will-occur-los-angeles-area-san-francisco-bay-area.

Washington Post. 2021. California moves toward launching nation’s first heat wave ranking system.

December 1. Accessed April 7, 2022. https://www.washingtonpost.com/weather/2021/12/01/heat-wave- ranking-los-angeles-california/.

City of Long Beach Hazard Mitigation Plan
Appendix A. Public Outreach Materials

STEERING COMMITTEE

MEETINGS
City of Long Beach
Hazard Mitigation Plan
Project Kickoff Meeting
12 AUG 2021 -1400
Virtual Conference Call Meeting

Welcome and Introductions
• Group Introductions
o City of Long Beach – Reggie Harrison
o Tetra Tech – Rob Flaner

Project Overview – Rob Flaner
• Work plan
• Timeline
• Important milestones
• Value Adds

Committees – Rob Flaner & Bart Spencer
• Core Planning Team
• Steering Committee
o Purpose
o Expectations
o Organization
o Ground rules

Plan Review – Rob Flaner
• Homework!
• Review prior HMP
o What needs to be updated?
• Review CA State Hazard Mitigation Plan
o Hazards of concern for Long Beach
o State plan’s goals and objectives-Are they consistent with Long Beach’s Plan?

Public Involvement Strategy – Rob Flaner
• Press release announcing commencement of the plan update process • Update the HMP website with information on the plan update • Additional Outreach Capabilities (suggestions welcomed) o Website
o Survey-Should we do one again?
o Press/media
o Social Media

Action Items and Next Steps – Rob Flaner
• Risk Assessment Document and Data Request
• Confirm Hazards of Concern
• Confirm Guiding Principle (aka mission statement), Goals and Objectives • Confirm Critical Facilities definition

Adjourn
City of Long Beach LHMP Steering Committee Kickoff Meeting

Date/Time of Meeting: Thursday, August 12, 2021, 2:03 PM (Start Time) Location: Digital
Subject: Steering Committee Kickoff Meeting
Project Name: City of Long Beach Local Hazard Mitigation Plan Update In Attendance

City of Long Beach: Francisco Soto, Rebecca Lopez, Reginald Harrison, Evan Zeisel, Belinda Ramirez, Allyson Joy, Gabriela Hurtado, Larissa Lomen, Alison Spindler-Ruiz, Joel Aguillar, Mark Berne, Vincent Rodriguez, Brian McPhail, Steve Choi, David Khorram, Brian LeSoto, Brian Lam, James Farley, Jennifer Ly, Karl Zittel
Tetra Tech: Rob Flaner, Bart Spencer, Jeana Gomez, Carol Baumann, Des Alexander
Not Present: N/A
Summary Prepared by: Des Alexander
Quorum – Yes or No N/A

Welcome and Introductions
• Reginald Harrison thanked everyone for their participation in the LHMP process. He spoke about the importance of updating the LHMP regularly and on-schedule – given the expenses associated with natural disasters, it is a high priority that the City remains eligible for relevant grant funding by having an updated LHMP.
• Both Long Beach Steering Committee members and Tetra Tech staff introduced themselves to one another.

Project Overview
• Rob Flaner went over the steps of the LHMP process. He introduced the 5 phases of emergency management, defining mitigation and how it is applied to long-term risk to life and property. He discussed the Disaster Mitigation Act and how it affects access to mitigation funds (no plan, no money).
o $5.7 billion in funding this year for mitigation actions. o The plan must meet all DMA provisions, so following the process will be crucial. Cal OES and FEMA are very process-oriented, so following the process will assist in getting the plan approved.
o Benefits of HMPs include collaboration, eligibility for grant funds, increased understanding of risks/vulnerabilities, reducing negative impacts, and encouraging sustainable actions.
• Rob introduced the 8 phases of the planning process and went over how Tetra Tech approaches each phase. The schedule projects a 12-month time frame, with a target date for submittal to CalOES/FEMA is in mid-April 2022. If the City has an approved plan by September 2022, the City would be eligible for that year’s BRIC funding cycle.
o The City is eligible this year, but since the plan is to expire in March 2022, FEMA would withhold any funds earned until the plan was approved.

City of Long Beach LHMP Steering Committee Kickoff Meeting

o The plan would be submitted pre-adoption and would be returned Approved Pending Adoption; the City Council would need to approve the plan and submit the resolution to FEMA.
 If any substantive changes occurred, there would need to be another public comment period and another submittal.
o The LHMP process would add value to the City through following CRS script (could improve CRS score); training on doing a Benefit Cost Analysis; and access to Tetra Tech’s BATool for plan maintenance.

Committees
• Rob introduced the ground rules of the steering committee. Public access will be provided to some aspects of this process, so the process needs to be organized around a firm set of rules and standards (quorum, leadership, attendance, public comment protocol, standard meeting dates/times, etc).
• Francisco Soto stated that there are 17 confirmed steering committee members. • Quorum is typically 50% + 1, but there are no strict FEMA requirements. • Francisco Lopez agreed to be the Chair and Rebecca Lopez will be the Vice Chair. • Alternates are permitted to attend and are given full voting rights. • Tetra Tech will provide sample agendas to City for them to choose which meetings will be open vs. closed. Francisco Soto will provide City’s public comment protocol to Tetra Tech. The charter will be written as the Chair as the designated spokesperson for the plan. • Meetings will take place on the 2
nd Thursday of the month from 2 – 4 PM.
• Tetra Tech will provide a charter to the City to be posted on the LHMP website.

Plan Review
• Homework for SC: Review 2017 City of Long Beach LHMP (likes/dislikes, changes to address) and the 2018 CA State HMP (goals, consistency with LBC plan, hazards of concern). • Des Alexander will send the links to both plans.
o These will be discussed at the next meeting.

Public Involvement Strategy
• The public outreach strategy was discussed. This will involve multiple media types and will be deployed in 2 phases – early in the process to gauge public perception of risk and at the end of the process to allow for comment on the Draft Plan.
• Media mediums to be used include press releases, a website, social media, a survey, public meetings, an ESRI Story Map, and some open SC meetings. • The strategy will be led by Jeana Gomez and she will coordinate those efforts moving forward. • Update process will become the basis for the continuing public involvement requirement of the plan maintenance strategy.

Action Items and Next Steps
• CPT will provide a data wish-list request to the City. • SC will confirm the Hazards of Concern for the plan, set the goals/objectives and confirm the definition for Critical Facilities/Infrastructure at the next meeting. • Rob Flaner asked about getting information from Port of LB and need for an NDA. o Joel Aguilar says they have a standard nondisclosure agreement that he will provide.

City of Long Beach LHMP Steering Committee Kickoff Meeting

Final Questions/Comments
• Joel Aguilar asked about liquefaction analysis and stated that they have their own data for assessing core facilities.
• Jennifer Ly stated that the City performed analysis as part of their CAP process and the updated General Plan, and the current Safety Element update will be good sources of data. City also recently updated their Land Use Element, and the Housing Element is on track to be adopted by the end of the year. Information from the Noise Element may also be used. There is a social vulnerability layer (Cool Cities LA, Cal EnviroScreen) to the CAP that can also be provided. • Joel Aguilar asked about avenues for providing data to Tetra Tech. Carol Baumann said she can set up a OneDrive folder and provide access to City officials.

Adjourn
• Next Meeting: Thursday, September 9, 2021 from 2PM to 4PM • End time: 3:31 PM
City of Long Beach
Hazard Mitigation Plan
2nd Steering Committee Meeting
9 SEP 2021 -1400
Virtual Conference Call Meeting

Welcome and Introductions
• Group Introductions
o Review/Approve Meeting Summary

Plan Review – Rob Flaner
• Prior LB Plan
o What did you like?
o What did you not Like?
• CA State HMP
o Are the LB Goals consistent with the State Goals
o What Hazards of Concern does the State Plan say LB is susceptible to? • Los Angeles County Plan
o What Hazards did it assess?
o Other observations

Hazards of Concern-Rob Flaner
• Natural Hazards?
• Non-natural Hazards?
• Hazard Scenarios?

Goal Setting – Rob Flaner
• Linear Goal Setting-What is it?
• Mission/Vision Statement-Do we want one
• Review/Confirm Goals

Public Involvement Strategy – Jeana Wiser
• Outreach Strategy
o Phase 1-Early in the process to gage the Public’s perception of Risk o Phase 2-At the end of the process to allow for Public Comment • Multi-Media Approach
o Survey
o Social Media
o Story-Map

Action Items and Next Steps – Rob Flaner
• Risk Assessment Update
• Goal Setting-Objectives
• Define Critical Facilities/ Infrastructure
• Status of Prior actions

Adjourn
City of Long Beach LHMP Steering Committee Kickoff Meeting

Date/Time of Meeting: Thursday, September 9, 2021, 2:02 PM (Start Time) Location: Digital
Subject: Steering Committee Kickoff Meeting
Project Name: City of Long Beach Local Hazard Mitigation Plan Update In Attendance

City of Long Beach: Reggie Harrison, Francisco Soto, Rebecca Lopez, Jennifer Ly, Karl Sittel, Joel Aguilar, Steve Choi, Belinda Ramirez, Evan Zeisel, David Khorram, Alison Spindler Ruiz, Mark Berne, Morgan Venter, Gabriela Hurtado, James Farley, Brian Lam, Derek Law, Brian La Sota, Allyson Joy, Vincent Rodriguez
Tetra Tech: Rob Flaner, Bart Spencer, Jeana Wiser, Des Alexander Not Present: Willie Owens, Brian McPhail, Sandy Wedgeworth Summary Prepared by: Des Alexander
Quorum – Yes or No Yes

Welcome and Introductions
• Francisco Lopez completed the roll call and quorum was achieved • Rob Flaner reintroduced himself for those who were not on the 1st call. He explained that Bart Spencer will lead calls in the future, and reintroduced other members of the Tetra Tech team. • There were no revisions made to the minutes from the previous meeting. A motion to approve the minutes was made by Gabriela Hurtado and seconded by Francisco Soto. • Rob explained the goals for the meeting – confirming the hazards of concern, completing goal/objective setting, and discussing the public outreach strategy.

Plan Review
• Current LB Plan
o There was a lot of discussion on perceived inadequacies in the public health section.

Gabriela Hurtado said that the health hazards were very barebones with no previous data, and that this needs to be improved given COVID pandemic. She said the City has data that can investigate impacts of public health emergencies within Long Beach, discussing public health actions in a mitigation context has been challenging. o Reggie Harrison also said city would be remiss to not address public health, and that a potential mitigation action could focus on public outreach to build trust in impacted areas
 Rob stated that prior to last year, FEMA did not fund public health disaster events. He said it is also difficult to compare these events to disasters like flood and earthquake that affect property and infrastructure. Exposure and analysis typically looks at physical environment; explained that public health is typically looked at as a “hazard of interest” in plans without a HAZUS analysis. o David Khorram did not see information regarding oil wells and potential for explosions in the event of earthquakes and other eruptions. The City just created a GIS data layer City of Long Beach LHMP Steering Committee Kickoff Meeting

for methane exposure that can be used in the analysis. Building collapse (like FL condo collapse) is also an issue due to old building stock and sea exposure. Funding to support a study of building vulnerability could be valuable.
 Rob stated that liquefaction will be assessed, oil wells could be added as a standalone hazard, building collapse would be challenging to assess given the current hazard assessment methodologies – if data is available, then hazard profile can be completed, need to do research
o Jennifer Ly stated that climate change needs to be bolstered in plan update and extreme heat is not discussed – major power outage in 2015 due to heat  Alison Spindler Ruiz discussed transportation infrastructure at risk due to extreme heat
• Rob explains that severe weather aggregates extreme heat, high wind, and other intense weather phenomenon
o Joel Aguilar stated that the tsunami section was not consistent with Port study. New data from CA geologic study can be used for tsunami assessment, but if there is better data through Port then that can be used.
 Palos Verdes fault should be discussed in LHMP, given port impacts • CA State HMP
o Alison Spindler-Ruiz stated that this plan had lots of health equity information that was missing from LB plan
o Climate adaptation efforts mentioned and could be good to mention in plan update, goals also align with City’s goals
• LA County Plan
o Question: Homelessness has been a problem for flood control districts; can this be listed as a hazard?
 Rob stated that homelessness can be listed as a vulnerability factor in hazard profiles
Hazards of Concern
• Rob explained to the committee that including non-natural hazards is not required by FEMA, but can be included to acknowledge other local plans in place to deal with them • The LHMP must discuss climate change due to state requirements o Sea Level Rise has been treated as a standalone hazard in the past, so it can be one for this plan.
• Planning area defined as the city limits
• Hazards of Concern for Long Beach LHMP
o Natural hazards – dam failure, drought, earthquake, flood, severe weather (extreme heat, high winds, thunderstorms, fog), tsunami, methane gas eruptions (oil wells), building collapse (age, discuss in earthquake), climate change o Human caused – terrorism, cyber, public health, hazardous materials (AES battery storage), pipelines (natural gas), transportation, civil unrest • A motion to approve the hazards of concern was made by Francisco Sosa, seconded by David Khorram. This was approved by the committee.

Goal Setting
• Tabled until next meeting
City of Long Beach LHMP Steering Committee Kickoff Meeting

Public Involvement Strategy
• Jeana and Francisco have been working together due to expedited process (March 2022 submittal)
• Jeana showed slide show about strategy – leveraging existing capacities of City, language translation (received from Francisco, starting with public survey), public input opportunities throughout the process, 2 phases of public involvement
• Media release will announce project and highlight website – Jeana will get that up and running with Francisco
o Public survey will be advertised through community partner events o StoryMap will be set up throughout plan process
• Phase 2 will take place during public comment period
o StoryMap, draft plan review, all risk data will be made available • Public survey in survey monkey
o 15 questions to assess risk perception
o Jeana will work with Francisco in development and expects to have draft to show at the next meeting
• StoryMap example from Oakland displayed, showed Hazard Mapper and other capabilities • Jennifer Ly explained that the planning department has done community outreach and can share strategies on engagement. She also added that speaking more about climate change piece can help in outreach process, highlighting images could also be helpful • Rob explained that continuing public outreach can be set up throughout this process, can be part of plan maintenance post update
• Vincent Rodriguez stated that his office will send data for analysis and StoryMap within the next two weeks
o Needs Esri account to log-in for StoryMap creation
Action Items and Next Steps
• Next meeting – October 14, 2021 from 2 -4 PM
Final Questions/Comments
• None from the committee
Adjourn
• 4:01 PM
City of Long Beach
Hazard Mitigation Plan
Steering Committee Meeting #3 - Virtual Conference Call Meeting 14 OCT 2021

Welcome – Francisco Soto
• General announcements and information
• Roll call
• Review and approval of meeting summary of Steering Committee #2

Planning Process – Bart Spencer
• Team member updates
• Mission statement
• Goal setting
• Objective setting

Hazard Analysis – Carol Bauman

Public Engagement – Rob Flaner
• Strategy discussion
• Survey presentation & distribution discussion
• Storymap update

Adjourn

City of Long Beach LHMP Steering Committee Kickoff Meeting Date/Time of Meeting:

Location:

Subject:

Project Name:

In Attendance
Not Present:

Summary Prepared by:

Quorum – Yes or No
Thursday, October 14, 2021, 2:04 PM (Start Time)
Digital
Steering Committee Meeting #3
City of Long Beach Local Hazard Mitigation Plan Update
City of Long Beach: Rebecca Lopez, Francisco Soto, James Farley, Andre Balanji (alt. for Gabriela Hurtado), Bryan La Sota, Karl Zittel, Belinda Ramirez, Carline Hua, Steve Choi, Evan Zeisel, David Khorram, Jennifer Ly, Lian Mae Tualla, Willie Owens, Mark Berne, Morgan Venter, Vincent Rodriguez, Sandy Wedgeworth, Joel Aguillar
Tetra Tech: Rob Flaner, Bart Spencer, Carol Baumann, Des Alexander, Nate Stueve
Reggie Harrison, Brian McPhail, Alison Spindler Ruiz, Brian Lam, Derek Law, Allyson Joy
Des Alexander
Yes
Welcome
• Roll call was taken by Des Alexander. Quorum was achieved. • Motion to approve meeting summary by Francisco Soto and seconded by David Khorram. No opposition was raised.
• Public engagement discussion was moved to beginning of the discussion due to a conflicting engagement
Planning Process
• Bart stated that Jeana Wiser had to step away from the process, so for now he and Rob will be covering the public engagement piece. Bart also welcomed new staff member Nate Stueve to the Tetra Tech team and LHMP process.
• Bart showed the sample goals and objectives to the committee. The goals are the “swimlanes” that form direction of the plan and objectives serve as measures of success that prioritize action items. These will be sent to the committee, who will provide feedback and will discuss them at the next meeting. Bart requested that feedback be submitted within the next two weeks.
o Early discussion revolved around earthquake retrofits, climate change adaptation.

Hazard Analysis
• Carol showed the committee the draft matrix, which shows the hazards of concern, the types of analysis that will be done for each hazard, and the scenarios/data sources that City of Long Beach LHMP Steering Committee Kickoff Meeting

will be used for the analysis. The matrix will be updated throughout the process as more conversations occur.
• Tetra Tech is working to set up a meeting with the Port to discuss their work on earthquake analysis.
• A question was raised regarding the analysis included in the public health hazard – Bart stated that FEMA does not require public health be assessed (not a natural hazard), but they do encourage jurisdictions to look at all hazards. Rob stated that since public health cannot be assessed the way the natural hazards are, it will be included in the “hazards of concern” chapter. This chapter will be a qualitative look at the hazard. • The planning department is currently updating their safety element and questions emerged regarding evacuation routes for undeveloped areas and evacuation routes for several hazards. Rob stated that the LHMP is not responsible for dictating response or preparedness functions; evacuation routes are typically covered in EOPs, not mitigation plans. Core capability assessment and adaptive capacity assessment (for climate change) is part of the process, but it does not go into evacuation-related issues.

Public Engagement
• Multilingual survey has been developed on SurveyMonkey and will be submitted to the committee for comment (English, Spanish, Tagalog). The results of the survey will be used to prioritize action items for the city.
• Engagement with the City has begun on the creation of the StoryMap. This will include geospatial data that maps local hazards. This will be a “living” platform, designed to be updated continually.

Action Items and Next Steps
• Next meeting – November 11, 2021 from 2 – 4 PM
Final Questions/Comments
• Planning department asked about coordination between Oakland’s LHMP, and their safety element given Tetra Tech’s involvement. Bart stated that given the accelerated timeline, there was not alignment between the LHMP update and the safety element update.

Adjourn
• 2:48 PM
City of Long Beach
Hazard Mitigation Plan
Steering Committee Meeting #4 - Virtual Conference Call Meeting 11 NOV 2021 – Veterans Day

Welcome – Francisco Soto
• General announcements and information
• Roll call
• Review and approval of meeting summary of Steering Committee #3

Planning Process – Bart Spencer
• Planning update
• Finalize goal setting
• Finalize objective setting

Risk Assessment – Carol Baumann
• Progress update

Public Engagement – Rob Flaner
• Survey update
• StoryMap update

Adjourn

City of Long Beach LHMP Steering Committee Kickoff Meeting Date/Time of Meeting:

Location:

Subject:

Project Name:

In Attendance
N
ot Present:

Summary Prepared by:

Quorum – Yes or No
Thursday, November 11, 2021, 2:03 PM (Start Time)
Digital
Steering Committee Meeting #4
City of Long Beach Local Hazard Mitigation Plan Update
City of Long Beach: Reggie Harrison, Francisco Soto, Rebecca Lopez, Karl Sittel, Joel Aguilar, Steve Choi, Belinda Ramirez, David Khorram, Jennifer Ly, Alison Spindler Ruiz, Mark Berne, Morgan Venter, James Farley, Brian Lam, Vincent Rodriguez, Lian Mai Tualla, Gina Casillas
Tetra Tech: Rob Flaner, Bart Spencer, Carol Baumann, Des Alexander, Nate Stueve
Willie Owens, Brian McPhail, Evan Zeisel, Gabriela Hurtado, Sandy Wedgeworth, Derek Law, Brian La Sota, Allyson Joy
Des Alexander
Yes
Welcome
• Francisco Soto welcomed everyone to the call and completed the roll call. Quorum was achieved.
• After reviewing the summary from the 3rd steering committee meeting, no comments or corrections were made. A motion to approve the summary was made by James Farley and seconded by Rebecca Lopez. No objections were raised
.

Planning Process
• Bart Spencer provided an update on the status of the LHMP. Right now, Tetra Tech is doing a lot of behind the scenes work on the analyses and profiling, with many conversations occurring w
ith relevant departments.
• Bart Spencer presented the draft goals and objectives to the committee. During the goal d
iscussion, Jennifer Ly commented that climate adaptation and resiliency need to be listed.

Francisco said that the objective that covers both will be included under the “Create a Healthy and Equitable Environment” goal. He said that all other comments submitted by the committee were included in the new draft.
o A motion to accept the goals was made by Francisco Soto and seconded by Rebecca Lopez. No objections were raised.
• No comments were made on the objectives .
o A
motion to accept the objectives was made by Francisco Soto and seconded by Rebecca Lopez. No objections were raised.

Risk Assessment
• Carol Baumann updated the committee on her work with the hazard analysis. She said she had received many GIS data sources from Vincent Rodriguez, and that she met separately with the City of Long Beach LHMP Steering Committee Kickoff Meeting

Port of Long Beach to discuss their available data. The Port is currently pulling their critical facilities data to add to Tetra Tech’s structure inventory, which will be a key part of the assessment. Carol also stated that she will work with Francisco on hazard scenarios and hopes to show the scenarios list to the committee at the next meeting. • Vincent Rodriguez asked if there will be more data requests that he will need to field. o Carol thinks he is done on his end, but she will collaborate with County, other sources on any gaps. She will also coordinate with Francisco Soto on how to get any missing data from specific departments.
• Alison Spindler Ruiz asked about potential overlaps between the LHMP process and the safety element update’s compliance, specifically around SBC379 (climate adaptation/vulnerability), emergency routes, and residential development in hazard areas. The safety element not updated since 1975 but requirements must be put in place by end of 2021. o Regarding emergency routes, Rob stated that evacuation planning is not part of the LHMP process but is rather a preparedness or response function. However, data from the HMP can be used to determine evacuation routes. Francisco Soto stated that Long Beach Police Department has a separate plan for evacuation routes and that the City plan will be updated soon.

o Regarding SBC379, Rob stated that when Tetra Tech finishes the core capability assessment an adaptive capacity evaluation will be completed afterwards. Departments provide this ranking (High, Medium, or Low) and if something is ranked low, it should have an action in the plan that addresses it. This will be centric on sea level rise analysis, which will dial in on vulnerability. Rob will email Alison after the meeting on language that can be included to satisfy pending requirements.

Public Engagement
• Rob Flaner provided an update on the current public engagement efforts. As of 11/11 there were only 7 responses to the public survey. Francisco Soto stated that that is because the survey has not yet been released; it will be opened to the public early next week.

o Committee members should reach out to Francisco by end-of-week if they have changes to include
o Languages other than English: Spanish, Tagalog, Khmer • Rob Flaner also provided an update on the StoryMap. Tetra Tech is building a public-facing, interactive platform that will include a hazard mapper that allows the public to view how their homes intersect with different hazard areas; information on action items and the draft plan; and other information relevant to the plan. This platform is GIS-based on an Esri platform and will evolve as the plan evolves.

o Rob stated that Tetra Tech wants to debut content by the next meeting o Francisco will include links/images of the StoryMap with this meeting’s minutes in an email to the committee

o Next steps: Plan virtual public meeting to display content once StoryMap and surveys are complete.

Other Discussion Items
• Alison Spindler Ruiz informed the committee that Jennifer Ly is leaving the City of Long Beach, so Gina Casillas will be replacing her on the committee. Bart Spencer stated that Tetra Tech needs her email address for future communications and to maintain records. He stated that City of Long Beach LHMP Steering Committee Kickoff Meeting

FEMA & CalOES care a lot about the process of producing the LHMP, so it is important for the committee and Tetra Tech to maintain accurate records.
• Francisco Soto stated that he wants to present to the Board or Commission on the LHMP, so he wants committee members to reach out to him to discuss anything they want addressed. He is also currently working on consolidating/reconciling the action items (over 300) from the previous LHMP. This will require assistance from several departments, so he will be reaching out to committee members regarding this information.

Adjourn
• End time: 2:39 PM
City of Long Beach
Hazard Mitigation Plan
Steering Committee Meeting #5 - Virtual Conference Call Meeting February 10, 2022

Welcome – Francisco Soto
• General announcements and information
• Roll call
• Review and approval of meeting summary of Steering Committee #4

Planning Process – Bart Spencer
• Planning update
• Action Items preliminary discussion

Risk Assessment – Carol Bauman & Nate Stueve
• Hazard & Risk Analysis update
• Story Map update and preview

Public Engagement – Rob Flaner
• Survey update
• Website update

Adjourn

City of Long Beach LHMP Steering Committee Meeting #5

Date/Time of Meeting: Thursday, February 10, 2021, 2:06 PM (Start Time) Location: Digital
Subject: Steering Committee Meeting #5
Project Name: City of Long Beach Local Hazard Mitigation Plan Update In Attendance

City of Long Beach: Reggie Harrison, Francisco Soto, Rebecca Lopez, Willie Owens, Karl Zittel, Joel Aguilar, Belinda Ramirez, Eric Matusak, Alison Spindler Ruiz, Gina Casillas, Lian Mae Tualla, Mark Berne, Morgan Venter, Gabriela Hurtado, James Farley, Brian La Sota, Vincent Rodriguez, Dale Wiersma (for David Khorram), Megan O’Keefe, Alexander Angotti Tetra Tech: Bart Spencer, Rob Flaner, Carol Baumann, Nate Stueve, Des Alexander
Not Present: Richard Barrata, David Khorram, Sandy Wedgeworth, Brian Lam, Derek Law, Allyson Joy
Summary Prepared by: Des Alexander
Quorum – Yes or No Yes

Welcome
• Francisco Soto opened the meeting by taking roll call. Quorum was achieved. • Mr. Soto asked the committee to review and approve the previous meeting’s summary. After hearing no corrections or discussion, a motion to approve the meeting summary was brought by Mr. Soto and seconded by Rebecca Lopez. The summary was approved.

Planning Process
• Bart Spencer explained the process for putting together the plan, specifically internal review processes and communications. Mr. Spencer explained that Tetra Tech is working to have a draft to give the City soon, with the plan to have the plan completed by April. • Mr. Spencer stated that the committee should start to think of action items for the next five years of the LHMP. Action items can be as varied as plan updates, equipment purchases, changes to codes/standards, infrastructure improvements, etc. The goal is to phrase action items in a way to make them attractive for grant funding sources. • Mr. Spencer advised the committee to look at current City plans (i.e., capital improvement) to look for projects that have not yet been started. The committee should seek “low-hanging fruit” projects that can be completed within the five year life of the LHMP. • Rob Flaner also stated that any actions that the City of Long Beach wants to carry over from the previous LHMP can be prioritized first. Also, each hazard ranked as “high” needs to have at least one action item.

Risk Assessment
City of Long Beach LHMP Steering Committee Meeting #5

• Carol Baumann provided an update to the committee on the risk assessment. Ms. Baumann received sea level rise data from Mr. Soto and is in the process of creating point-location data for city structures.
• Ms. Baumann is also looking at replacement costs for structures exposed to hazards, based on structure usage and square footage. The City provided a population GIS layer that used council district boundaries and 2010 Census population. To determine growth rate, Ms. Baumann calculated the difference between the 2010 and 2020 Census population stats and then applied the rate to the district boundaries to update population numbers. After some discussion, Tetra Tech agreed to use zip code boundaries rather than council districts. • The building stock analysis will focus on critical facilities using the FEMA Lifelines Construct. • Following the Risk Assessment update, Nate Stueve previewed the StoryMap with the steering committee. The StoryMap is built on a Long Beach platform so that it can be continually updated throughout the life of the plan, using the best-available data to visualize hazard risk for Long Beach staff and the City’s residents.
• The StoryMap includes important definitions, as well as the LHMP’s overview, goals, objectives, and a copy of the public engagement survey.
• Mr. Stueve said that the StoryMap link is designed to work on desktops, laptops, smartphones, and tablets. However, the map’s content is not able to be translated into another language without building a second platform. He also said that he can put together an instruction guide for the StoryMap, as well set the default map to only have a few layers turned on.

• Questions/Comments from the Steering Committee
o Alison Spindler Ruiz commented that the City has already calculated sea level rise replacement costs for a separate plan, so it will be helpful to see the Hazus analysis for consistency purposes.
o Reggie Harrison expressed concern about the language translation limitations of the story map. The City will have internal conversations about how translation of the software can be completed.
o Vincent Rodriguez agreed to send Tetra Tech a GIS layer of Long Beach’s zip codes.

Public Engagement
• Mr. Stueve walked through the survey questions with the committee. The committee advised that Question 1 be changed from regions to zip codes. All updates will be included and sent to the committee ASAP.

Adjourn
• End time: 4:29 PM

SURVEY RESULTS
City of Long Beach Hazard Mitigation Plan Update Public Survey 1 / 18
Q1 Which zip code in Long Beach do you live in? (Check one) Answered: 102 Skipped: 0
District 1
90805
90807
90810
90808
90806
90813
90804
90814
90803
90802
90815
District 2
District 3
District 4
District 5
District 6
District 7
District8
City of Long Beach Hazard Mitigation Plan Update Public Survey 2 / 18

0.98% 1

10.78% 11

9.80% 10

3.92% 4

13.73% 14

1.96% 2

3.92% 4

7.84% 8

5.88% 6

7.84% 8

10.78% 11

9.80% 10

0.00% 0

0.98% 1

0.00% 0

0.00% 0

1.96% 2

0.00% 0

0.00% 0

0.00% 0

8.82% 9

0.98% 1
TOTAL 102
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
District 8
District 9
Other
Don't live in
Long Beach

ANSWER CHOICES RESPONSES
District 1
90805
90807
90810
90808
90806
90813
90804
90814
90803
90802
90815
District 2
District 3
District 4
District 5
District 6
District 7
District 8
District 9
Other
Don't live in Long Beach
City of Long Beach Hazard Mitigation Plan Update Public Survey 3 / 18
Q2 What steps has your household taken to prepare for a disaster?(Check all that apply) Answered: 102 Skipped: 0
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Received First
Aid/CPR...

Made a fire
escape plan
Designated an
evacuation...

Identified
utility shut...

Maintain an
emergency...

Installed
smoke and...

Written and
practiced an...

Participated
in neighborh...

Maintain a
working fire...

Maintain extra
medical...

None
City of Long Beach Hazard Mitigation Plan Update Public Survey 4 / 18

44.12% 45

0.98% 1

18.63% 19

52.94% 54

56.86% 58

75.49% 77

5.88% 6

7.84% 8

2.94% 3

47.06% 48

9.80% 10
Total Respondents: 102

ANSWER CHOICES RESPONSES
Received First Aid/CPR training
Made a fire escape plan
Designated an evacuation meeting place
Identified utility shutoff locations
Maintain an emergency supply kit (e.g. batteries, flashlights, battery-powered radio, food/water) Installed smoke and carbon monoxide detectors, and maintain a working fire extinguisher at home Written and practiced an individual or family disaster plan (e.g. earthquake, fire, tsunami, etc.) Participated in neighborhood preparedness and planning
Maintain a working fire extinguisher at home
Maintain extra medical supplies (e.g. first aid kit, medications) None
City of Long Beach Hazard Mitigation Plan Update Public Survey 5 / 18
Q3 How do you get information about emergency preparedness? (Checkall that apply) Answered: 102 Skipped: 0
Internet
Social Media
(e.g. Twitter)
Radio
TV
Public Meetings
Workshops
Schools and
Academic...
f
TV Ads
h
Radio Ads
Government
Sources
Billboards
Fire Department
Church and
other...

CERT Classes
Public
Awareness...

Books
City of Long Beach Hazard Mitigation Plan Update Public Survey 6 / 18
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Chamber of
Commerce
Academic
Institutions
Public Library
American Red
Cross...

Community
Safety Fairs
Newspaper
Informational
Brochures
City of Long Beach Hazard Mitigation Plan Update Public Survey 7 / 18

76.47% 78

32.35% 33

25.49% 26

32.35% 33

11.76% 12

8.82% 9

13.73% 14

0.00% 0

0.00% 0

0.00% 0

0.00% 0

40.20% 41

3.92% 4

10.78% 11

1.96% 2

16.67% 17

14.71% 15

0.00% 0

0.98% 1

0.00% 0

5.88% 6

11.76% 12

10.78% 11

15.69% 16

16.67% 17
Total Respondents: 102

ANSWER CHOICES RESPONSES
Internet
Social Media (e.g. Twitter)
Radio
TV
Public Meetings
Workshops
Schools and Academic Institutions
f
TV Ads
h
Radio Ads
Government Sources
Billboards
Fire Department
Church and other faith-based groups
CERT Classes
Public Awareness Campaign (e.g. Flood Awareness Week)
Books
Chamber of Commerce
Academic Institutions
Public Library
American Red Cross Information
Community Safety Fairs
Newspaper
Informational Brochures
City of Long Beach Hazard Mitigation Plan Update Public Survey 8 / 18
Q4 Which of the following natural and human-caused hazard events haveyou experienced or been affected by within Long Beach? (Check all thatapply) Answered: 102 Skipped: 0
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Civil Unrest
Climate Change
(i.e. sea le...

Cyber
Dam Failure
Drought
Earthquake
Flood
Hazardous
Materials (e...

Methane Gas
Eruptions (i...

Pipeline
Eruptions (i...

Public Health
Hazards
Severe Weather
(i.e. high...

Terrorism
Tsunami
City of Long Beach Hazard Mitigation Plan Update Public Survey 9 / 18

57.84% 59

41.18% 42

5.88% 6

2.94% 3

43.14% 44

65.69% 67

8.82% 9

6.86% 7

0.00% 0

1.96% 2

41.18% 42

36.27% 37

2.94% 3

5.88% 6
Total Respondents: 102

ANSWER CHOICES RESPONSES
Civil Unrest
Climate Change (i.e. sea level rise, extreme heat)
Cyber
Dam Failure
Drought
Earthquake
Flood
Hazardous Materials (e.g. AES battery storage)
Methane Gas Eruptions (i.e. oil wells)
Pipeline Eruptions (i.e. natural gas)
Public Health Hazards
Severe Weather (i.e. high winds, thunderstorms, fog)
Terrorism
Tsunami
City of Long Beach Hazard Mitigation Plan Update Public Survey 10 / 18
Q5 How prepared is your household to deal with a hazard event? Checkone:

Answered: 102 Skipped: 0

13.73%
14 47.06%
48 21.57%
22 12.75%
13 4.90%
5 102

2.48 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Not at all p… Somewhat … Adequately… Well prepar…
Very well pr…
Check one:

NOT AT ALLPREPARED SOMEWHATPREPARED ADEQUATELYPREPARED WELLPREPARED VERY WELLPREPARED TOTAL WEIGHTEDAVERAGE Check
one:

City of Long Beach Hazard Mitigation Plan Update Public Survey 11 / 18
Q6 Please rank the below natural hazards from 1 (most concerning) to 7(least concern/not concerned at all):

Answered: 79 Skipped: 23

17.33%
13 20.00%
15 22.67%
17 14.67%
11 9.33%
7 9.33%
7 6.67%
5 75

4.67 4.00%
3 0.00%
0 4.00%
3 8.00%
6 8.00%
6 20.00%
15 56.00%
42 75

2.00 17.33%
13 25.33%
19 28.00%
21 13.33%
10 8.00%
6 6.67%
5 1.33%
1 75

5.05 53.25%
41 25.97%
20 11.69%
9 5.19%
4 2.60%
2 0.00%
0 1.30%
1 77

6.17 0.00%
0 8.00%
6 4.00%
3 20.00%
15 33.33%
25 26.67%
20 8.00%
6 75

3.09 4.11%
3 8.22%
6 20.55%
15 32.88%
24 20.55%
15 6.85%
5 6.85%
5 73

3.95 5.13%
4 7.69%
6 10.26%
8 6.41%
5 19.23%
15 30.77%
24 20.51%
16 78

2.99 0 1 2 3 4 5 6 7 8 9 10
Climate change
(e.g. sea le...

Flooding
caused by da...

Drought
Earthquake
Flood
Severe weather
(e.g. high...

Tsunami
1 2 3 4 5 6 7 TOTAL SCORE
Climate change (e.g. sea level rise,
extreme heat)
Flooding caused by dam failure
Drought
Earthquake
Flood
Severe weather (e.g. high winds,
thunderstorms, fog)
Tsunami
City of Long Beach Hazard Mitigation Plan Update Public Survey 12 / 18
Q7 Please rank the below human-caused hazards from 1 (mostconcerning) to 5 (least concern/not concerned at all):

Answered: 76 Skipped: 26

27.14%
19 25.71%
18 21.43%
15 15.71%
11 10.00%
7 70

3.44 15.71%
11 24.29%
17 28.57%
20 27.14%
19 4.29%
3 70

3.20 40.54%
30 21.62%
16 18.92%
14 14.86%
11 4.05%
3 74

3.80 13.70%
10 13.70%
10 19.18%
14 20.55%
15 32.88%
24 73

2.55 4.05%
3 9.46%
7 14.86%
11 22.97%
17 48.65%
36 74

1.97 0 1 2 3 4 5 6 7 8 9 10
Civil Unrest
Cyber Attacks
Public Health
Hazards (e.g...

Terrorism
Hazardous
materials (e...
1 2 3 4 5 TOTAL SCORE
Civil Unrest
Cyber Attacks
Public Health Hazards (e.g. Pandemic)
Terrorism
Hazardous materials (e.g. Battery storage)
City of Long Beach Hazard Mitigation Plan Update Public Survey 13 / 18

83.72% 72

16.28% 14
Q8 Would the disclosure of natural hazard information influence yourdecision to purchase or move into a home (house, condo, apartment, etc.)today? (Check one) Answered: 86 Skipped: 16
TOTAL 86
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Yes
No

ANSWER CHOICES RESPONSES
Yes
No
City of Long Beach Hazard Mitigation Plan Update Public Survey 14 / 18

19.77% 17

37.21% 32

27.91% 24

29.07% 25
Q9 To the best of your knowledge, does the home in which you live have:(Check all that apply) Answered: 86 Skipped: 16
Total Respondents: 86
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flood
insurance...

Earthquake
insurance...

Not sure
Neither

ANSWER CHOICES RESPONSES
Flood insurance policy
Earthquake insurance policy
Not sure
Neither
City of Long Beach Hazard Mitigation Plan Update Public Survey 15 / 18

5.81% 5

73.26% 63

20.93% 18
Q10 Have you ever had difficulty obtaining homeowners or rentersinsurance due to risks from natural hazards? (Check one) Answered: 86 Skipped: 16
TOTAL 86
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Yes
No
Not sure

ANSWER CHOICES RESPONSES
Yes
No
Not sure
City of Long Beach Hazard Mitigation Plan Update Public Survey 16 / 18

47.67% 41

58.14% 50

44.19% 38

67.44% 58

24.42% 21

46.51% 40

51.16% 44

3.49% 3

17.44% 15
Q11 Which incentives would encourage you to retrofit your home to protectagainst natural disasters? (Check all that apply) Answered: 86 Skipped: 16
Total Respondents: 86
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Building
permit fee...

Insurance
premium...

Mortgage
discount
Property tax
break or...

Low interest
loan
Free local
government...

Grant funding
None of the
above
Not applicable

ANSWER CHOICES RESPONSES
Building permit fee waiver
Insurance premium discount
Mortgage discount
Property tax break or incentive
Low interest loan
Free local government technical assistance
Grant funding
None of the above
Not applicable
City of Long Beach Hazard Mitigation Plan Update Public Survey 17 / 18
Q12 Please indicate how you feel about the following statement: (Checkone)"I think it is important to provide education and programs that promotecommunity members to take action to reduce their exposure and risks tonatural hazards." Answered: 86 Skipped: 16

10.47%
9 2.33%
2 5.81%
5 26.74%
23 54.65%
47 86

4.13 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Strongly Di… Somewhat … Neither Agr… Somewhat …
Strongly Ag…
Choose one:

STRONGLYDISAGREE SOMEWHATDISAGREE NEITHER AGREE NORDISAGREE SOMEWHATAGREE STRONGLYAGREE TOTAL WEIGHTEDAVERAGE Choose
one:

City of Long Beach Hazard Mitigation Plan Update Public Survey 18 / 18

58.14% 50

13.95% 12

55.81% 48

22.09% 19

34.88% 30
Q13 If a natural disaster such as a large earthquake were to striketomorrow... (Check all that apply) Answered: 86 Skipped: 16
Total Respondents: 86
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
I feel
confident th...

I am unsure
how to prote...

I keep an
emergency ki...

I have
practiced an...

I am unsure
where I woul...

ANSWER CHOICES RESPONSES
I feel confident that I know how to protect myself during an earthquake I am unsure how to protect myself during an earthquake
I keep an emergency kit with spare food and water for myself and my family I have practiced an evacuation plan and/or know where I and my family would go if we needed to evacuate our home I am unsure where I would go if I needed to evacuate my home

City of Long Beach Hazard Mitigation Plan
Appendix B. Summary of Federal and State
Agencies, Programs and Regulation

B-1
B. SUMMARY OF FEDERAL AND STATE AGENCIES,

PROGRAMS AND REGULATION
Existing laws, ordinances, plans and programs at the federal and state level can support or impact hazard mitigation actions identified in this plan. Hazard mitigation plans are required to include a review and incorporation, if appropriate, of existing plans, studies, reports, and technical information as part of the planning process (44 CFR, Section 201.6(b)(3)). The following federal and state programs have been identified as programs that may interface with the actions identified in this plan. Each program enhances capabilities to implement mitigation actions or has a nexus with a mitigation action in this plan. Information presented in this section can be used to review local capabilities to implement the actions found in the action plan presented in Chapter 19.

FEDERAL
Americans with Disabilities Act
The Americans with Disabilities Act (ADA) seeks to prevent discrimination against people with disabilities in employment, transportation, public accommodation, communications, and government activities. Title II of the ADA deals with compliance with the Act in emergency management and disaster-related programs, services, and activities. It applies to state and local governments as well as third parties, including religious entities and private nonprofit organizations.

The ADA has implications for sheltering requirements and public notifications. During an emergency alert, officials must use a combination of warning methods to ensure that all residents have all necessary information. Those with hearing impairments may not hear radio, television, sirens, or other audible alerts, while those with visual impairments may not see flashing lights or other visual alerts.

Two technical documents for shelter operators address physical accessibility needs of people with disabilities, as well as medical needs and service animals.

The ADA intersects with disaster preparedness programs in regards to transportation, social services, temporary housing, and rebuilding. Persons with disabilities may require additional assistance in evacuation and transit (e.g., vehicles with wheelchair lifts or paratransit buses). Evacuation and other response plans should address the unique needs of residents. Local governments may be interested in implementing a special-needs registry to identify the home addresses, contact information, and needs for residents who may require more assistance.

FEMA hazard mitigation project grant applications require full compliance with applicable federal acts.

Any action identified in this plan that falls within the scope of this act will need to meet its requirements.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-2
Civil Rights Act of 1964
The Civil Rights Act of 1964 prohibits discrimination based on race, color, religion, sex or nation origin and requires equal access to public places and employment. The Act is relevant to emergency management and hazard mitigation in that it prohibits local governments from favoring the needs of one population group over another. Local government and emergency response must ensure the continued safety and well-being of all residents equally, to the extent possible. FEMA hazard mitigation project grant applications require full compliance with applicable federal acts. Any action identified in this plan that falls within the scope of this act will need to meet its requirements.

Clean Water Act
The federal Clean Water Act (CWA) employs regulatory and non-regulatory tools to reduce direct pollutant discharges into waterways, finance municipal wastewater treatment facilities, and manage polluted runoff. These tools are employed to achieve the broader goal of restoring and maintaining the chemical, physical, and biological integrity of the nation’s surface waters so that they can support “the protection and propagation of fish, shellfish, and wildlife and recreation in and on the water.” Evolution of CWA programs over the last decade has included a shift from a program-by-program, source-by-source, and pollutant-by-pollutant approach to more holistic watershed-based strategies.

Under the watershed approach, equal emphasis is placed on protecting healthy waters and restoring impaired ones. Numerous issues are addressed, not just those subject to CWA regulatory authority.

Involvement of stakeholder groups in the development and implementation of strategies for achieving and maintaining water quality and other environmental goals is a hallmark of this approach.

The CWA is important to hazard mitigation in several ways. There are often permitting requirements for any construction within 200 feet of water of the United States, which may have implications for mitigation projects identified by a local jurisdiction. Additionally, CWA requirements apply to wetlands, which serve important functions related to preserving and protecting the natural and beneficial functions of floodplains and are linked with a community’s floodplain management program. Finally, the National Pollutant Discharge Elimination System is part of the CWA and addresses local stormwater management programs. Stormwater management plays a critical role in hazard mitigation by addressing urban drainage or localized flooding issues within jurisdictions.

FEMA hazard mitigation project grant applications require full compliance with applicable federal acts.

Any action identified in this plan that falls within the scope of this act will need to meet its requirements.

Community Development Block Grant Disaster Resilience Program In response to disasters, Congress may appropriate additional funding for the U.S. Department of Housing and Urban Development Community Development Block Grant programs to be distributed as Disaster Recovery grants (CDBG-DR). These grants can be used to rebuild affected areas and provide seed money to start the recovery process. CDBG-DR assistance may fund a broad range of recovery activities, helping communities and neighborhoods that otherwise might not recover due to limited resources. CDBG-DR grants often supplement disaster programs of FEMA, the Small Business Administration, and the U.S. Army Corps of Engineers. Housing and Urban Development generally awards noncompetitive, nonrecurring CDBG-DR grants by a formula that considers disaster recovery City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-3
needs unmet by other federal disaster assistance programs. To be eligible for CDBG-DR funds, projects must meet the following criteria:
• Address a disaster-related impact (direct or indirect) in a presidentially declared county for the covered disaster
• Be a CDBG-eligible activity (according to regulations and waivers) • Meet a national objective.

Incorporating preparedness and mitigation into these actions is encouraged, as the goal is to rebuild in ways that are safer and stronger. CDBG-DR funding is a potential alternative source of funding for actions identified in this plan.

Community Rating System
The CRS is a voluntary program within the NFIP that encourages floodplain management activities that exceed the minimum NFIP requirements. Flood insurance premiums are discounted to reflect the reduced flood risk resulting from community actions meeting the following three goals of the CRS:
• Reduce flood losses.
• Facilitate accurate insurance rating.
• Promote awareness of flood insurance.

For participating communities, flood insurance premium rates are discounted in increments of 5 percent. For example, a Class 1 community would receive a 45 percent premium discount, and a Class 9 community would receive a 5 percent discount. (Class 10 communities are those that do not participate in the CRS; they receive no discount.) The discount partially depends on location of the property. Properties outside the special flood hazard area receive smaller discounts: a 10-percent discount if the community is at Class 1 to 6 and a 5-percent discount if the community is at Class 7 to 9.

The CRS classes for local communities are based on 18 creditable activities in the following categories:
• Public information
• Mapping and regulations
• Flood damage reduction
• Flood preparedness.

CRS activities can help to save lives and reduce property damage. Communities participating in the CRS represent a significant portion of the nation’s flood risk; over 66 percent of the NFIP’s policy base is located in these communities. Communities receiving premium discounts through the CRS range from small to large and represent a broad mixture of flood risks, including both coastal and riverine flood risks.

Disaster Mitigation Act
The DMA is the current federal legislation addressing hazard mitigation planning. It emphasizes planning for disasters before they occur. It specifically addresses planning at the local level, requiring plans to be in place before Hazard Mitigation Assistance grant funds are available to communities. This City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-4
plan is designed to meet the requirements of DMA, improving eligibility for future hazard mitigation funds.

Emergency Relief for Federally Owned Roads Program
The U.S. Forest Service’s Emergency Relief for Federally Owned Roads Program was established to assist federal agencies with repair or reconstruction of tribal transportation facilities, federal lands transportation facilities, and other federally owned roads that are open to public travel and have suffered serious damage by a natural disaster over a wide area or by a catastrophic failure. The program funds both emergency and permanent repairs (Office of Federal Lands Highway, 2016).

Eligible activities under this program meet some of the goals and objectives for this plan and the program is a possible funding source for actions identified in this plan.

Emergency Watershed Program
The U. S. Department of Agriculture Natural Resources Conservation Service administers the Emergency Watershed Protection Program, which responds to emergencies created by natural disasters. Eligibility for assistance is not dependent on a national emergency declaration. The program is designed to help people and conserve natural resources by relieving imminent hazards to life and property caused by floods, fires, windstorms, and other natural occurrences. Emergency Watershed Protection is an emergency recovery program. Financial and technical assistance are available for the following activities (Natural Resources Conservation Service, 2016):
• Remove debris from stream channels, road culverts, and bridges • Reshape and protect eroded banks
• Correct damaged drainage facilities
• Establish cover on critically eroding lands
• Repair levees and structures
• Repair conservation practices.

This federal program could be a possible funding source for actions identified in this plan.

Endangered Species Act
The federal Endangered Species Act (ESA) was enacted in 1973 to conserve species facing depletion or extinction and the ecosystems that support them. The act sets forth a process for determining which species are threatened and endangered and requires the conservation of the critical habitat in which those species live. The ESA provides broad protection for species of fish, wildlife and plants that are listed as threatened or endangered. Provisions are made for listing species, as well as for recovery plans and the designation of critical habitat for listed species. The ESA outlines procedures for federal agencies to follow when taking actions that may jeopardize listed species and contains exceptions and exemptions. It is the enabling legislation for the Convention on International Trade in Endangered Species of Wild Fauna and Flora. Criminal and civil penalties are provided for violations of the ESA and the Convention.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-5
Federal agencies must seek to conserve endangered and threatened species and use their authorities in furtherance of the ESA’s purposes. The ESA defines three fundamental terms:
• Endangered means that a species of fish, animal or plant is “in danger of extinction throughout all or a significant portion of its range.” (For salmon and other vertebrate species, this may include subspecies and distinct population segments.)
• Threatened means that a species “is likely to become endangered within the foreseeable future.” Regulations may be less restrictive for threatened species than for endangered species. • Critical habitat means “specific geographical areas that are…essential for the conservation and management of a listed species, whether occupied by the species or not.” Five sections of the ESA are of critical importance to understanding it:
• Section 4: Listing of a Species—The National Oceanic and Atmospheric Administration Fisheries Service (NOAA Fisheries) is responsible for listing marine species; the U.S. Fish and Wildlife Service is responsible for listing terrestrial and freshwater aquatic species. The agencies may initiate reviews for listings, or U.S. citizens may petition for them. A listing must be made “solely on the basis of the best scientific and commercial data available.” After a listing has been proposed, agencies receive comment and conduct further scientific reviews for 12 to 18 months, after which they must decide if the listing is warranted. Economic impacts cannot be considered in this decision, but it may include an evaluation of the adequacy of local and state protections. Critical habitat for the species may be designated at the time of listing. • Section 7: Consultation—Federal agencies must ensure that any action they authorize, fund, or carry out is not likely to jeopardize the continued existence of a listed or proposed species or adversely modify its critical habitat. This includes private and public actions that require a federal permit. Once a final listing is made, non-federal actions are subject to the same review, termed a “consultation.” If the listing agency finds that an action will “take” a species, it must propose mitigations or “reasonable and prudent” alternatives to the action; if the proponent rejects these, the action cannot proceed.
• Section 9: Prohibition of Take—It is unlawful to “take” an endangered species, including killing or injuring it or modifying its habitat in a way that interferes with essential behavioral patterns, including breeding, feeding or sheltering.
• Section 10: Permitted Take—Through voluntary agreements with the federal government that provide protections to an endangered species, a non-federal applicant may commit a take that would otherwise be prohibited as long as it is incidental to an otherwise lawful activity (such as developing land or building a road). These agreements often take the form of a “Habitat Conservation Plan.”
• Section 11: Civil Lawsuits—Civil actions initiated by any U.S. citizen can require the listing agency to enforce the ESA’s prohibition of taking or to meet the requirements of the consultation process.

FEMA hazard mitigation project grant applications require full compliance with applicable federal acts.

Any action identified in this plan that falls within the scope of this act will need to meet its requirements.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-6
Federal Energy Regulatory Commission Dam Safety Program The Federal Energy Regulatory Commission (FERC) cooperates with a large number of federal and state agencies to ensure and promote dam safety. More than 3,000 dams are part of regulated hydroelectric projects in the FERC program. Two-thirds of these are more than 50 years old. As dams age, concern about their safety and integrity grows, so oversight and regular inspection are important.

FERC inspects hydroelectric projects on an unscheduled basis to investigate the following:
• Potential dam safety problems
• Complaints about constructing and operating a project • Safety concerns related to natural disasters
• Issues concerning compliance with the terms and conditions of a license.

Every five years, an independent engineer approved by the FERC must inspect and evaluate projects with dams higher than 32.8 feet (10 meters), or with a total storage capacity of more than 2,000 acre- feet.

FERC monitors seismic research and applies it in performing structural analyses of hydroelectric projects. FERC also evaluates the effects of potential and actual large floods on the safety of dams.

During and following floods, FERC visits dams and licensed projects, determines the extent of damage, if any, and directs any necessary studies or remedial measures the licensee must undertake. The FERC publication Engineering Guidelines for the Evaluation of Hydropower Projects guides the FERC engineering staff and licensees in evaluating dam safety. The publication is frequently revised to reflect current information and methodologies.

FERC requires licensees to prepare emergency action plans and conducts training sessions on how to develop and test these plans. The plans outline an early warning system if there is an actual or potential sudden release of water from a dam due to failure. The plans include operational procedures that may be used, such as reducing reservoir levels and reducing downstream flows, as well as procedures for notifying affected residents and agencies responsible for emergency management.

These plans are frequently updated and tested to ensure that everyone knows what to do in emergency situations.

National Dam Safety Act
Potential for catastrophic flooding due to dam failures led to passage of the National Dam Inspection Act in 1972, creation of the National Dam Safety Program in 1996, and reauthorization of the program through the Dam Safety Act in 2006. National Dam Safety Program, administered by FEMA requires a periodic engineering analysis of the majority of dams in the country; exceptions include the following:
• Dams under jurisdiction of the Bureau of Reclamation, Tennessee Valley Authority, or International Boundary and Water Commission
• Dams constructed pursuant to licenses issued under the Federal Power Act • Dams that the Secretary of the Army determines do not pose any threat to human life or property.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-7
The goal of this FEMA-monitored effort is to identify and mitigate the risk of dam failure so as to protect lives and property of the public. The National Dam Safety Program is a partnership among the states, federal agencies, and other stakeholders that encourages individual and community responsibility for dam safety. Under FEMA’s leadership, state assistance funds have allowed all participating states to improve their programs through increased inspections, emergency action planning, and purchases of needed equipment. FEMA has also expanded existing and initiated new training programs. Grant assistance from FEMA provides support for improvement of dam safety programs that regulate most of the dams in the United States.

National Environmental Policy Act
The National Environmental Policy Act requires federal agencies to consider the environmental impacts of proposed actions and reasonable alternatives to those actions, alongside technical and economic considerations. The National Environmental Policy Act established the Council on Environmental Quality, whose regulations (40 CFR Parts 1500-1508) set standards for compliance. Consideration and decision-making regarding environmental impacts must be documented in an environmental impact statement or environmental assessment. Environmental impact assessment requires the evaluation of reasonable alternatives to a proposed action, solicitation of input from organizations and individuals that could be affected, and an unbiased presentation of direct, indirect, and cumulative environmental impacts. FEMA hazard mitigation project grant applications require full compliance with applicable federal acts. Any action identified in this plan that falls within the scope of this act will need to meet its requirements.

National Flood Insurance Program
The National Flood Insurance Program (NFIP) makes federally backed flood insurance available to homeowners, renters, and business owners in participating communities that enact floodplain regulations. Participation and good standing under NFIP are prerequisites to grant funding eligibility under the Robert T. Stafford Act. NFIP participation is limited to local governments that possess permit authority and have the ability to adopt and enforce regulations that govern land use.

For most participating communities, FEMA has prepared a detailed Flood Insurance Study. The study presents water surface elevations for floods of various magnitudes, including the 1-percent-annual- chance flood and the 0.2-percent-annual-chance flood. Base flood elevations and the boundaries of the flood hazard areas are shown on Flood Insurance Rate Maps, which are the principle tool for identifying the extent and location of the flood hazard. Flood Insurance Rate Maps are the most detailed and consistent data source available, and for many communities they represent the minimum area of oversight under the local floodplain management program. In recent years, Flood Insurance Rate Maps have been digitized as Digital Flood Insurance Rate Maps, which are more accessible to residents, local governments and stakeholders.

NFIP participants must, at a minimum, regulate development in floodplain areas in accordance with NFIP criteria. Before issuing a permit to build in a floodplain, participating jurisdictions must ensure that three criteria are met:
• New buildings and those undergoing substantial improvements must, at a minimum, be elevated to protect against damage by the 1-percent-annual-chance flood.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-8
• New floodplain development must not aggravate existing flood problems or increase damage to other properties.
• New floodplain development must exercise a reasonable and prudent effort to reduce its adverse impacts on threatened salmonid species.

In California, the Department of Water Resources (DWR) is the coordinating agency for floodplain management. DWR works with FEMA and local governments by providing grants and technical assistance, evaluating community floodplain management programs, reviewing local floodplain ordinances, participating in statewide flood hazard mitigation planning, and facilitating annual statewide workshops. Compliance is monitored by FEMA regional staff and by DWR.

National Incident Management System
The National Incident Management System (NIMS) is a systematic approach for government, nongovernmental organizations, and the private sector to work together to manage incidents involving hazards. The NIMS provides a flexible but standardized set of incident management practices.

Incidents typically begin and end locally, and they are managed at the lowest possible geographical, organizational, and jurisdictional level. In some cases, success depends on the involvement of multiple jurisdictions, levels of government, functional agencies, and emergency responder disciplines. These cases necessitate coordination across a spectrum of organizations. Communities using NIMS follow a comprehensive national approach that improves the effectiveness of emergency management and response personnel across the full spectrum of potential hazards (including natural hazards, technological hazards, and human-caused hazards) regardless of size or complexity.

Although participation is voluntary, federal departments and agencies are required to make adoption of NIMS by local and state jurisdictions a condition to receive federal preparedness grants and awards.

The content of this plan is considered to be a viable support tool for any phase of emergency management. The NIMS program is considered as a response function, and information in this hazard mitigation plan can support the implementation and update of all NIMS-compliant plans within the planning area.

Presidential Executive Order 11988, Floodplain Management Executive Order 11988 requires federal agencies to avoid to the extent possible the long and short- term adverse impacts associated with the occupancy and modification of floodplains and to avoid direct and indirect support of floodplain development wherever there is a practicable alternative. It requires federal agencies to provide leadership and take action to reduce the risk of flood loss, minimize the impact of floods on human safety, health, and welfare, and restore and preserve the natural and beneficial values of floodplains. The requirements apply to the following activities (FEMA, 2015a):
• Acquiring, managing, and disposing of federal lands and facilities • Providing federally undertaken, financed, or assisted construction and improvements • Conducting federal activities and programs affecting land use, including but not limited to water and related land resources planning, regulation, and licensing.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-9
Presidential Executive Order 11990, Protection of Wetlands Executive Order 11990 requires federal agencies to provide leadership and take action to minimize the destruction, loss or degradation of wetlands, and to preserve and enhance the natural and beneficial values of wetlands. The requirements apply to the following activities (National Archives, 2016):
• Acquiring, managing, and disposing of federal lands and facilities • Providing federally undertaken, financed, or assisted construction and improvements • Conducting federal activities and programs affecting land use, including but not limited to water and related land resources planning, regulation, and licensing.

All actions identified in this plan will seek full compliance with all applicable presidential executive orders.

U.S. Army Corps of Engineers Dam Safety Program
The U.S. Army Corps of Engineers operates and maintains approximately 700 dams nationwide. It is also responsible for safety inspections of some federal and non-federal dams in the United States that meet the size and storage limitations specified in the National Dam Safety Act. The Corps has inventoried dams; surveyed each state and federal agency’s capabilities, practices and regulations regarding design, construction, operation and maintenance of the dams; and developed guidelines for inspection and evaluation of dam safety. The Corps maintains the National Inventory of Dams, which contains information about a dam’s location, size, purpose, type, last inspection and regulatory status (U.S. Army Corps of Engineers, 2017).

U.S. Army Corps of Engineers Flood Hazard Management
The following U.S. Army Corps of Engineers authorities and programs related to flood hazard management:
• The Floodplain Management Services program offers 100-percent federally funded technical services such as development and interpretation of site-specific data related to the extent, duration and frequency of flooding. Special studies may be conducted to help a community understand and respond to flood risk. These may include flood hazard evaluation, flood warning and preparedness, or flood modeling.
• For more extensive studies, the Corps of Engineers offers a cost-shared program called Planning Assistance to States and Tribes. Studies under this program generally range from $25,000 to $100,000 with the local jurisdiction providing 50 percent of the cost. • The Corps of Engineers has several cost-shared programs (typically 65 percent federal and 35 percent non-federal) aimed at developing, evaluating and implementing structural and non- structural capital projects to address flood risks at specific locations or within a specific watershed:
 The Continuing Authorities Program for smaller-scale projects includes Section 205 for Flood Control, with a $7 million federal limit and Section 14 for Emergency Streambank Protection with a $1.5 million federal limit. These can be implemented without specific authorization from Congress.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-10
 Larger scale studies, referred to as General Investigations, and projects for flood risk management, for ecosystem restoration or to address other water resource issues, can be pursued through a specific authorization from Congress and are cost-shared, typically at 65 percent federal and 35 percent non-federal.
 Watershed management planning studies can be specifically authorized and are cost- shared at 50 percent federal and 50 percent non-federal. • The Corps of Engineers provides emergency response assistance during and following natural disasters. Public Law 84-99 enables the Corps to assist state and local authorities in flood fight activities and cost share in the repair of flood protective structures. Assistance is provided in the flowing categories:
 Preparedness—The Flood Control and Coastal Emergency Act establishes an emergency fund for preparedness for emergency response to natural disasters; for flood fighting and rescue operations; for rehabilitation of flood control and hurricane protection structures.

Funding for Corps of Engineers emergency response under this authority is provided by Congress through the annual Energy and Water Development Appropriation Act. Disaster preparedness activities include coordination, planning, training and conduct of response exercises with local, state and federal agencies.
 Response Activities—Public Law 84-99 allows the Corps of Engineers to supplement state and local entities in flood fighting urban and other non-agricultural areas under certain conditions (Engineering Regulation 500-1-1 provides specific details). All flood fight efforts require a project cooperation agreement signed by the public sponsor and the sponsor must remove all flood fight material after the flood has receded. Public Law 84-99 also authorizes emergency water support and drought assistance in certain situations and allows for “advance measures” assistance to prevent or reduce flood damage conditions of imminent threat of unusual flooding.
 Rehabilitation—Under Public Law 84-99, an eligible flood protection system can be rehabilitated if damaged by a flood event. The flood system would be restored to its pre- disaster status at no cost to the federal system owner, and at 20-percent cost to the eligible non-federal system owner. All systems considered eligible for Public Law 84-99 rehabilitation assistance have to be in the Rehabilitation and Inspection Program prior to the flood event. Acceptable operation and maintenance by the public levee sponsor are verified by levee inspections conducted by the Corps on a regular basis. The Corps has the responsibility to coordinate levee repair issues with interested federal, state, and local agencies following natural disaster events where flood control works are damaged.

These authorities and programs are all available to support any related mitigation actions.

STATE
AB 32: The California Global Warming Solutions Act
This bill identifies the following potential adverse impacts of global warming:
“… the exacerbation of air quality problems, a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels resulting in the displacement of thousands of coastal businesses and residences, damage to marine ecosystems and the natural environment, and an increase in the incidences of infectious diseases, asthma, and other human health-related problems.”
City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-11
AB 32 establishes a state goal of reducing greenhouse gas emissions to 1990 levels by 2020 (a reduction of approximately 25 percent from forecast emission levels), with further reductions to follow.

The law requires the state Air Resources Board to do the following:
• Establish a program to track and report greenhouse gas emissions. • Approve a scoping plan for achieving the maximum technologically feasible and cost-effective reductions from sources of greenhouse gas emissions.
• Adopt early reduction measures to begin moving forward. • Adopt, implement and enforce regulations—including market mechanisms such as “cap and- trade” programs—to ensure that the required reductions occur.

The Air Resources Board has adopted a statewide greenhouse gas emissions limit and an emissions inventory, along with requirements to measure, track, and report greenhouse gas emissions by the industries it determined to be significant sources of greenhouse gas emissions.

AB 70: Flood Liability
This bill provides that a city or county may be required to contribute a fair and reasonable share to compensate for property damage caused by a flood to the extent that it has increased the state’s exposure to liability for property damage by unreasonably approving new development in a previously undeveloped area that is protected by a state flood control project, unless the city or county meets specified requirements.

AB 162: Flood Planning
This California State Assembly Bill passed in 2007 requires cities and counties to address flood-related matters in the land use, conservation, and safety and housing elements of their general plans. The land use element must identify and annually review the areas covered by the general plan that are subject to flooding as identified in floodplain mapping by either FEMA or the state Department of Water Resources (DWR). During the next revision of the housing element on or after January 1, 2009, the conservation element of the general plan must identify rivers, creeks, streams, flood corridors, riparian habitat, and land that may accommodate floodwater for the purpose of groundwater recharge and stormwater management. The safety element must identify information regarding flood hazards, including:
• Flood hazard zones
• Maps published by FEMA, DWR, the U.S. Army Corps of Engineers, the Central Valley Flood Protection Board, and the Governor’s Office of Emergency Services (Cal OES) • Historical data on flooding
• Existing and planned development in flood hazard zones.

The general plan must establish goals, policies and objectives related to flooding risks, including:
• Avoiding or minimizing the risks of flooding new development • Evaluating whether new development should be located in flood hazard zones City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-12
• Identifying construction methods to minimize damage.

AB 162 establishes goals, policies and objectives related to flooding risks. It establishes procedures for the determination of available land suitable for urban development, which may exclude lands where FEMA or DWR has concluded that the flood management infrastructure is not adequate to avoid the risk of flooding.

AB 747: Required Information for General Plan Safety Elements This bill requires California communities with general plans to address evacuation routes in the safety element of the general plan. Information on the evacuation routes and their capacity, safety and viability under a range of emergency scenarios must be provided. For communities that have not adopted a local hazard mitigation plan, the safety element must be updated with this information by January 1, 2022. For those with a local hazard mitigation plan, the requirement applies upon the next revision of the hazard mitigation plan on or after January 1, 2022. Communities that have adopted a local hazard mitigation plan, emergency operations plan, or other document that fulfills the goals and objectives of this law may comply with this requirement by summarizing and incorporating by reference the other plan or document in the safety element.

In subsequent revisions to the safety element, communities also will be required to identify new information relating to flood and fire hazards and climate adaptation and resiliency strategies applicable to the city or county that was not available during the previous revision of the safety element. These subsequent updates must occur upon each revision of the general plan housing element or local hazard mitigation plan and not less than once every eight years.

AB 2140: General Plans—Safety Element
This bill provides that the state may allow for more than 75 percent of public assistance funding under the California Disaster Assistance Act only if the local agency is in a jurisdiction that has adopted a local hazard mitigation plan as part of the safety element of its general plan. The local hazard mitigation plan needs to include elements specified in this legislation. In addition, this bill requires Cal OES to give preference for federal mitigation funding to cities and counties that have adopted local hazard mitigation plans. The intent of the bill is to encourage cities and counties to create and adopt hazard mitigation plans.

AB 2800: Climate Change—Infrastructure Planning
This California State Assembly bill passed in 2016 and until July 1, 2020, requires state agencies to take into account the current and future impacts of climate change when planning, designing, building, operating, maintaining, and investing in state infrastructure. The bill, by July 1, 2017, and until July 1, 2020, requires an agency to establish a Climate-Safe Infrastructure Working Group to examine how to integrate scientific data concerning projected climate change impacts into state infrastructure engineering.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-13
Alquist-Priolo Earthquake Fault Zoning Act
The Alquist-Priolo Earthquake Fault Zoning Act was enacted in 1972 to mitigate the hazard of surface faulting to structures for human occupancy. The Alquist-Priolo Earthquake Fault Zoning Act’s main purpose is to prevent construction of buildings used for human occupancy on the surface trace of active faults. Before a new project is permitted, cities and counties require a geologic investigation to demonstrate that proposed buildings will not be constructed on active faults. The act addresses only the hazard of surface fault rupture and is not directed toward other earthquake hazards, such as liquefaction or seismically induced landslides. The law requires the State of California Geologist to establish regulatory zones around the surface traces of active faults and to issue appropriate maps.

The maps are distributed to all affected cities, counties, and state agencies for their use in planning and controlling new or renewed construction. Local agencies must regulate most development projects within the zones. Projects include all land divisions and most structures for human occupancy. All seismic hazard mitigation actions identified in this plan will seek full compliance with the Alquist-Priolo Earthquake Fault Zoning Act.

California Department of Water Resources
In California, the DWR is the coordinating agency for floodplain management. The DWR works with FEMA and local governments by providing grants and technical assistance, evaluating community floodplain management programs, reviewing local floodplain ordinances, participating in statewide flood hazard mitigation planning, and facilitating annual statewide workshops. Compliance is monitored by FEMA regional staff and by the DWR.

California Division of Safety of Dams
California’s Division of Safety of Dams (a division of the DWR) monitors the dam safety program at the state level and maintains a working list of dams in the state. When a new dam is proposed, Division engineers and geologists inspect the site and the subsurface. Upon submittal of an application, the Division reviews the plans and specifications prepared by the owner to ensure that the dam is designed to meet minimum requirements and that the design is appropriate for the known geologic conditions.

After approval of the application, the Division inspects all aspects of the construction to ensure that the work is done in accordance with the approved plans and specifications. After construction, the Division inspects each dam to ensure that it is performing as intended and is not developing problems. The Division periodically reviews the stability of dams and their major appurtenances in light of improved design approaches and requirements, as well as new findings regarding earthquake hazards and hydrologic estimates in California. Over 1,200 dams are inspected by Division engineers on a yearly schedule to ensure performance and maintenance of dams (California Division of Safety of Dams, 2017).

California Environmental Quality Act
The California Environmental Quality Act (CEQA) was passed in 1970, shortly after the federal government enacted the National Environmental Policy Act, to institute a statewide policy of environmental protection. CEQA requires state and local agencies in California to follow a protocol of analysis and public disclosure of the potential environmental impacts of development projects. CEQA City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-14
makes environmental protection a mandatory part of every California state and local agency’s decision- making process.

CEQA establishes a statewide environmental policy and mandates actions all state and local agencies must take to advance the policy. Jurisdictions conduct analysis of the project to determine if there are potentially significant environmental impacts, identify mitigation measures, and possible project alternatives by preparing environmental reports for projects that requires CEQA review. This environmental review is required before an agency takes action on any policy, program, or project. Any project action identified in this plan will seek full CEQA compliance upon implementation.

California General Planning Law
California state law requires that every county and city prepare and adopt a comprehensive long-range plan to serve as a guide for community development. The general plan expresses the community’s goals, visions, and policies relative to future land uses, both public and private. The general plan is mandated and prescribed by state law (Cal. Gov. Code §65300 et seq.), and forms the basis for most local government land use decision-making.

The plan must consist of an integrated, internally consistent set of goals, policies, and implementation measures. In addition, the plan must focus on issues of the greatest concern to the community and be written in a clear and concise manner. City and county actions, such as those relating to land use allocations, annexations, zoning, subdivision and design review, redevelopment, and capital improvements, must be consistent with the plan.

California Multi-Hazard Mitigation Plan
Under the DMA, California must adopt a federally approved state multi-hazard mitigation plan to be eligible for certain disaster assistance and mitigation funding. The intent of the State of California Multi- Hazard Mitigation Plan is to reduce or prevent injury and damage from hazards in the state through the following:
• Documenting statewide hazard mitigation planning in California • Describing strategies and priorities for future mitigation activities • Facilitating the integration of local and tribal hazard mitigation planning activities into statewide efforts
• Meeting state and federal statutory and regulatory requirements The plan is an annex to the State Emergency Plan, and it identifies past and present mitigation activities, current policies and programs, and mitigation strategies for the future. It also establishes hazard mitigation goals and objectives. The plan will be reviewed and updated annually to reflect changing conditions and new information, especially information on local planning activities. Under 44 CFR Section 201.6, local hazard mitigation plans must be consistent with their state’s hazard mitigation plan.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-15
California Residential Mitigation Program
The California Residential Mitigation Program was established in 2011 to help Californians strengthen their homes against damage from earthquakes. The program is a joint powers authority created by Cal OES and the California Earthquake Authority, which is a not-for-profit, publicly managed, privately funded provider of home earthquake insurance to California homeowners and renters.

Earthquake Brace + Bolt was developed to help homeowners lessen the potential for damage to their houses during an earthquake. A residential seismic retrofit strengthens an existing older house, making it more resistant to earthquake activity such as ground shaking and soil failure. The seismic retrofitting involves bolting the house to its foundation and adding bracing around the perimeter of the crawl space.

Most homeowners hire a contractor to do the retrofit work, and owners of houses in Zip codes with house characteristics suitable for this type of retrofit are eligible for up to $3,000 toward the cost. A typical retrofit by a contractor may cost between $3,000 and $7,000, depending on the location and size of the house, contractor fees, and the amount of materials and work involved. If the homeowner is an experienced do-it-yourselfer, a retrofit can cost less than $3,000.

California State Building Code
California Code of Regulations Title 24 (CCR Title 24), also known as the California Building Standards Code, is a compilation of building standards from three sources:
• Building standards that have been adopted by state agencies without change from building standards contained in national model codes
• Building standards that have been adopted and adapted from the national model code standards to meet California conditions
• Building standards authorized by the California legislature that constitute extensive additions not covered by the model codes adopted to address particular California concerns The state Building Standards Commission is authorized by California Building Standards Law (Health and Safety Code Sections 18901 through 18949.6) to administer the processes related to the adoption, approval, publication, and implementation of California’s building codes. These building codes serve as the basis for the design and construction of buildings in California. The national model code standards adopted into Title 24 apply to all occupancies in California, except for modifications adopted by state agencies and local governing bodies. Since 1989, the Building Standards Commission has published new editions of Title 24 every three years.

On January 1, 2014, California Building Code Accessibility Standards found in Chapter 11B incorporated the 2010 Americans with Disabilities Act (ADA) Standards as the model accessibility code for California. The purpose was to ensure consistency with federal guidelines. As a result of this incorporation, the California standards will fully implement and include 2010 ADA Standards within the California Building Code while maintaining enhanced levels of accessibility already provided by existing California accessibility regulations.

City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-16
Disadvantaged and Low-income Communities Investments
Senate Bill (SB) 535 directs state and local agencies to make investments that benefit California’s disadvantaged communities. It also directs the California Environmental Protection Agency to identify disadvantaged communities for the purposes of these investments based on geographic, socio- economic, public health, and environmental hazard criteria. Assembly Bill (AB) 1550 increased the percent of funds for projects located in disadvantaged communities from 10 to 25 percent and added a focus on investments in low-income communities and households. This program is a potential alternative source of funding for actions identified in this plan.

Division of the State Architect’s AB 300 List of Seismically At-Risk Schools In 2002, California’s Division of the State Architect completed an inventory of public school buildings built before 1978 that identifies buildings with characteristics that might make them unsafe in future earthquakes. This inventory provides a list of potentially at‐risk schools known as the AB 300 list (the inventory was authorized by Assembly Bill 300 in 1999). Using available information on school buildings’ dates of construction, seismic retrofits, and structural systems (wood‐frame, concrete shear wall, or steel moment frame, etc.), the inventory categorized California public school buildings into one of two categories: those expected to perform well in future earthquakes; and those that are not expected to perform well and require more detailed seismic evaluation.

The Division of the State Architect recommends that public schools on this list undergo detailed seismic evaluations to determine if they pose life safety risks, but the state has neither required nor funded school districts to do this.

Governor’s Executive Order S-13-08
Governor’s Executive Order S-13-08 enhances the state’s management of climate impacts from sea level rise, increased temperatures, shifting precipitation and extreme weather events. There are four key actions in the executive order:
• Initiate California’s first statewide climate change adaptation strategy to assess expected climate change impacts, identify where California is most vulnerable, and recommend adaptation policies. This effort will improve coordination within state government so that better planning can more effectively address climate impacts on human health, the environment, the state’s water supply and the economy.
• Request that the National Academy of Science establish an expert panel to report on sea level rise impacts in California, to inform state planning and development efforts. • Issue interim guidance to state agencies for how to plan for sea level rise in designated coastal and floodplain areas for new projects.
• Initiate a report on critical infrastructure projects vulnerable to sea level rise.

Senate Bill 92: Public Resources Portion of Biennial Budget Bill The State of California updated its requirements regarding emergency action plans (EAPs) via Senate Bill 92, which became effective in June 2017 as part of the state Legislature’s biennial budget process.

The bill required dam owners to submit EAPs to Cal OES and the Department of Water Resources for City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-17
approval by January 1, 2018 (for extremely high hazard dams), January 1, 2019 (for high-hazard dams), and January 1, 2021 (for significant hazard dams). The EAPs were to include the following (California Government Code Section 8589.5; Cal OES, 2018):
• Emergency notification flow charts
• Information on a four-step response process
• Description of agencies’ roles and actions in response to an emergency incident • Description of actions to be taken in advance of an emergency • Inundation maps
• Additional information such as revision records and distribution lists After the EAPs are approved by the state, the law requires dam owners to send the approved EAPs to relevant stakeholders. Local public agencies can then adopt emergency procedures that incorporate the information in the EAP in a manner that conforms to local needs and includes methods and procedures for alerting and warning the public and other response and preparedness related items (State of California, 2018).

SB 92 also requires dams other than low-risk dams to have current inundation mapping, which must be updated every 10 years, or sooner if specific circumstances change. EAPs also must be updated every 10 years. It provides DWR with enforcement tools, including fines and operational restrictions for failure to comply. Cal OES is required by the law to work with state and federal agencies, dam owners, planners, and the public to make dam inundation maps available to community members interested in learning their dam failure inundation risk.

Senate Bill 97: Guidelines for Greenhouse Gas Emissions Senate Bill 97, enacted in 2007, amends CEQA to clearly establish that greenhouse gas emissions and the effects of greenhouse gas emissions are appropriate subjects for CEQA analysis. It directs the Governor’s Office of Planning and Research to develop draft CEQA guidelines for the mitigation of greenhouse gas emissions or their effects by July 1, 2009 and directs the California Natural Resources Agency to certify and adopt the CEQA Guidelines by January 1, 2010.

Senate Bill 99: Evacuation Route Planning
Senate Bill 99, enacted in 2019, requires that cities’ and counties’ general plans address evacuation routes from any hazard area identified in the safety element. Under this law, the safety element must include information to identify residential developments in hazard areas that do not have at least two emergency evacuation routes. Each city or county must update its safety element with the new information upon the next revision of its housing element on or after January 1, 2020.

Senate Bill 379: General Plans: Safety Element—Climate Adaptation Senate Bill 379 builds upon the flood planning inclusions into the safety and housing elements and the hazard mitigation planning safety element inclusions in general plans outlined in AB 162 and AB 2140, respectively. SB 379 focuses on a new requirement that cities and counties include climate adaptation City of Long Beach Hazard Mitigation Plan Summary of Federal and State Agencies, Programs and Regulation B-18
and resiliency strategies in the safety element of their general plans beginning January 1, 2017. In addition, this bill requires general plans to include a set of goals, policies and objectives, and specified implementation measures based on the conclusions drawn from climate adaptation research and recommendations.

Senate Bill 1000: General Plan Amendments—Safety and Environmental Justice Elements
In 2016, Senate Bill 1000 amended California’s Planning and Zoning Law in two ways:
• The original law established requirements for initial revisions of general plan safety elements to address flooding, fire, and climate adaptation and resilience. It also required subsequent review and revision as necessary based on new information. Senate Bill 1000 specifies that the subsequent reviews and revision based on new information are required to address only flooding and fires (not climate adaptation and resilience). • Senate Bill 1000 adds a requirement that, upon adoption or revision of any two other general plan elements on or after January 1, 2018, an environmental justice element be adopted for the general plan or environmental justice goals, policies and objectives be incorporated into other elements of the plan.

Senate Bill 1035: Fire, Flood, and Adaptation Safety Element Updates Senate Bill 1035 clarifies that revisions to a community’s General Plan Safety Element—to address fire hazards, flood hazards, and climate adaptation and resilience strategies—must occur upon each revision to a Housing Element or Local Hazard Mitigation Program.

Standardized Emergency Management System
CCR Title 19 establishes the Standardized Emergency Management System (SEMS) to standardize the response to emergencies involving multiple jurisdictions. SEMS is intended to be flexible and adaptable to the needs of all emergency responders in California. It requires emergency response agencies to use basic principles and components of emergency management. Local governments must use SEMS by December 1, 1996, to be eligible for state funding of response-related personnel costs under CCR Title 19 (Sections 2920, 2925 and 2930). The roles and responsibilities of Individual agencies contained in existing laws or the state emergency plan are not superseded by these regulations. This hazard mitigation plan is considered to be a support document for all phases of emergency management, including those associated with SEMS.

City of Long Beach Hazard Mitigation Plan
Appendix C. Detailed Risk Assessment Results

Exposure and Estimated Loss
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: EQ ‐ 100‐yr Probabilistic Estimated
Population (1)
% Population
Exposed
Total Number of
Buildings (2)
Total Building Value
(Structure and contents
in $) (2)
% of Total Value
Exposed
Structure Debris
(x 1,000 Tons) (3)
Number of
Displaced
Households (3)
People Requiring
Short-Term Shelter
(3)
Value Structure in $
Damaged (4)
Value Contents in $
Damaged (4)
Total Value
(Structure and
Contents in $)
Damaged (4)
% of Total Value
Damaged
Zip Code 90802 42,525 100% 11,283 $12,555,654,893 100% 37.62 12 7 $46,470,580 $27,264,642 $73,735,222 0.6% Zip Code 90803 32,849 100% 11,659 $8,165,722,867 100% 18.62 13 5 $86,885,050 $39,100,741 $125,985,790 1.5% Zip Code 90804 39,045 100% 7,615 $5,898,611,853 100% 16.71 10 8 $41,772,982 $25,107,537 $66,880,519 1.1% Zip Code 90805 95,610 100% 18,133 $14,450,879,171 100% 61.81 32 33 $625,616,860 $281,050,480 $906,667,339 6.3% Zip Code 90806 41,547 100% 8,157 $7,082,584,420 100% 22.01 12 13 $194,347,739 $94,615,365 $288,963,104 4.1% Zip Code 90807 32,687 100% 9,772 $8,037,885,102 100% 14.52 8 5 $136,946,378 $68,743,054 $205,689,432 2.6% Zip Code 90808 38,395 100% 13,462 $10,569,261,412 100% 29.24 8 4 $319,601,208 $145,523,140 $465,124,348 4.4% Zip Code 90810 30,604 100% 5,890 $6,861,632,043 100% 25.25 7 7 $277,592,884 $135,748,736 $413,341,620 6.0% Zip Code 90813 53,238 100% 8,396 $10,398,406,550 100% 51.93 13 15 $265,392,804 $143,721,026 $409,113,830 3.9% Zip Code 90814 19,359 100% 5,739 $3,388,248,062 100% 6.35 5 2 $14,694,643 $8,608,979 $23,303,623 0.7% Zip Code 90815 40,937 100% 13,180 $10,307,061,812 100% 24.99 9 5 $185,705,645 $86,200,643 $271,906,288 2.6% Other 2,098 100% 154 $769,831,842 100% 2.69 0 0 $6,707,014 $4,628,845 $11,335,859 1.5% TOTAL 468,894 100% 113,440 $98,485,780,029 100% 311.75 129 105 $2,201,733,787 $1,060,313,187 $3,262,046,974 3.3% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip code (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Calculated using a Census tract level, general building stock (GBS) analysis in Hazus 5.1 (4) Calculated using an Advanced Engineering Building Model (AEBM) analysis in Hazus 5.

Jurisdiction
Estimated Exposure Economic Impact
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: EQ ‐ Compton M7.45 Estimated
Population (1)
% Population
Exposed
Total Number of
Buildings (2)
Total Building Value
(Structure and contents
in $) (2)
% of Total Value
Exposed
Structure Debris
(x 1,000 Tons) (3)
Number of
Displaced
Households (3)
People Requiring
Short-Term Shelter
(3)
Value Structure in $
Damaged (4)
Value Contents in $
Damaged (4)
Total Value
(Structure and
Contents in $)
Damaged (4)
% of Total Value
Damaged
Zip Code 90802 42,525 100% 11,283 $12,555,654,893 100% 682.88 131 75 $1,511,503,367 $613,230,861 $2,124,734,228 16.9% Zip Code 90803 32,849 100% 11,659 $8,165,722,867 100% 245.36 201 77 $877,958,492 $355,215,516 $1,233,174,007 15.1% Zip Code 90804 39,045 100% 7,615 $5,898,611,853 100% 273.74 125 101 $801,059,111 $347,039,025 $1,148,098,136 19.5% Zip Code 90805 95,610 100% 18,133 $14,450,879,171 100% 715.61 777 790 $2,603,396,762 $1,069,132,276 $3,672,529,038 25.4% Zip Code 90806 41,547 100% 8,157 $7,082,584,420 100% 303.44 230 247 $1,060,506,443 $471,629,656 $1,532,136,099 21.6% Zip Code 90807 32,687 100% 9,772 $8,037,885,102 100% 286.83 79 48 $978,710,869 $406,249,378 $1,384,960,247 17.2% Zip Code 90808 38,395 100% 13,462 $10,569,261,412 100% 384.08 199 113 $1,454,055,823 $680,063,739 $2,134,119,563 20.2% Zip Code 90810 30,604 100% 5,890 $6,861,632,043 100% 307.33 158 169 $1,257,424,569 $490,235,058 $1,747,659,626 25.5% Zip Code 90813 53,238 100% 8,396 $10,398,406,550 100% 723.42 125 146 $1,889,905,919 $949,801,655 $2,839,707,575 27.3% Zip Code 90814 19,359 100% 5,739 $3,388,248,062 100% 104.59 66 33 $326,238,627 $133,292,108 $459,530,735 13.6% Zip Code 90815 40,937 100% 13,180 $10,307,061,812 100% 344.20 166 92 $1,301,085,546 $516,565,716 $1,817,651,263 17.6% Other 2,098 100% 154 $769,831,842 100% 50.75 3 1 $126,123,947 $55,907,446 $182,031,392 23.6% TOTAL 468,894 100% 113,440 $98,485,780,029 100% 4,422.22 2,259 1,890 $14,187,969,475 $6,088,362,433 $20,276,331,908 20.6% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip code (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Calculated using a Census tract level, general building stock (GBS) analysis in Hazus 5.1 (4) Calculated using an Advanced Engineering Building Model (AEBM) analysis in Hazus 5.

Jurisdiction
Estimated Exposure Economic Impact
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: EQ ‐ Newport Inglewood M7.15 Estimated
Population (1)
% Population
Exposed
Total Number of
Buildings (2)
Total Building Value
(Structure and contents
in $) (2)
% of Total Value
Exposed
Structure Debris
(x 1,000 Tons) (3)
Number of
Displaced
Households (3)
People Requiring
Short-Term Shelter
(3)
Value Structure in $
Damaged (4)
Value Contents in $
Damaged (4)
Total Value
(Structure and
Contents in $)
Damaged (4)
% of Total Value
Damaged
Zip Code 90802 42,525 100% 11,283 $12,555,654,893 100% 575.99 58 33 $1,200,580,523 $472,405,035 $1,672,985,558 13.3% Zip Code 90803 32,849 100% 11,659 $8,165,722,867 100% 232.45 126 49 $820,583,511 $331,004,695 $1,151,588,206 14.1% Zip Code 90804 39,045 100% 7,615 $5,898,611,853 100% 261.38 73 58 $733,961,741 $313,282,211 $1,047,243,952 17.8% Zip Code 90805 95,610 100% 18,133 $14,450,879,171 100% 517.36 285 290 $1,814,870,459 $683,745,252 $2,498,615,711 17.3% Zip Code 90806 41,547 100% 8,157 $7,082,584,420 100% 278.74 136 147 $970,650,246 $425,088,875 $1,395,739,121 19.7% Zip Code 90807 32,687 100% 9,772 $8,037,885,102 100% 246.29 37 22 $816,557,985 $331,527,762 $1,148,085,747 14.3% Zip Code 90808 38,395 100% 13,462 $10,569,261,412 100% 291.79 67 38 $1,048,664,615 $474,578,969 $1,523,243,584 14.4% Zip Code 90810 30,604 100% 5,890 $6,861,632,043 100% 281.53 87 93 $1,091,558,003 $408,308,421 $1,499,866,423 21.9% Zip Code 90813 53,238 100% 8,396 $10,398,406,550 100% 628.55 57 66 $1,571,811,862 $771,136,548 $2,342,948,410 22.5% Zip Code 90814 19,359 100% 5,739 $3,388,248,062 100% 98.88 36 18 $287,081,271 $116,256,835 $403,338,106 11.9% Zip Code 90815 40,937 100% 13,180 $10,307,061,812 100% 308.46 88 49 $1,101,836,480 $424,643,099 $1,526,479,579 14.8% Other 2,098 100% 154 $769,831,842 100% 45.71 2 1 $102,111,940 $43,357,895 $145,469,835 18.9% TOTAL 468,894 100% 113,440 $98,485,780,029 100% 3,767.11 1,053 864 $11,560,268,636 $4,795,335,597 $16,355,604,232 16.6% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip code (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Calculated using a Census tract level, general building stock (GBS) analysis in Hazus 5.1 (4) Calculated using an Advanced Engineering Building Model (AEBM) analysis in Hazus 5.

Jurisdiction
Estimated Exposure Economic Impact
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: EQ ‐ Palos Verde M7.38 Estimated
Population (1)
% Population
Exposed
Total Number of
Buildings (2)
Total Building Value
(Structure and contents
in $) (2)
% of Total Value
Exposed
Structure Debris
(x 1,000 Tons) (3)
Number of
Displaced
Households (3)
People Requiring
Short-Term Shelter
(3)
Value Structure in $
Damaged (4)
Value Contents in $
Damaged (4)
Total Value
(Structure and
Contents in $)
Damaged (4)
% of Total Value
Damaged
Zip Code 90802 42,525 100% 11,283 $12,555,654,893 100% 529.59 24 13 $1,014,731,843 $390,905,991 $1,405,637,834 11.2% Zip Code 90803 32,849 100% 11,659 $8,165,722,867 100% 117.94 37 14 $426,207,822 $156,673,797 $582,881,619 7.1% Zip Code 90804 39,045 100% 7,615 $5,898,611,853 100% 120.29 4 4 $290,289,746 $114,348,497 $404,638,243 6.9% Zip Code 90805 95,610 100% 18,133 $14,450,879,171 100% 191.10 66 67 $774,336,196 $287,361,304 $1,061,697,499 7.3% Zip Code 90806 41,547 100% 8,157 $7,082,584,420 100% 158.81 70 73 $508,891,296 $200,110,998 $709,002,294 10.0% Zip Code 90807 32,687 100% 9,772 $8,037,885,102 100% 88.88 2 1 $270,372,885 $104,650,779 $375,023,664 4.7% Zip Code 90808 38,395 100% 13,462 $10,569,261,412 100% 108.48 15 8 $449,593,150 $180,869,045 $630,462,195 6.0% Zip Code 90810 30,604 100% 5,890 $6,861,632,043 100% 200.82 54 59 $719,062,463 $258,296,324 $977,358,787 14.2% Zip Code 90813 53,238 100% 8,396 $10,398,406,550 100% 531.01 15 18 $1,229,475,689 $600,727,648 $1,830,203,338 17.6% Zip Code 90814 19,359 100% 5,739 $3,388,248,062 100% 55.02 6 3 $131,366,597 $50,838,746 $182,205,343 5.4% Zip Code 90815 40,937 100% 13,180 $10,307,061,812 100% 125.77 13 7 $462,679,937 $172,890,712 $635,570,650 6.2% Other 2,098 100% 154 $769,831,842 100% 32.04 1 0 $55,297,639 $16,784,777 $72,082,415 9.4% TOTAL 468,894 100% 113,440 $98,485,780,029 100% 2,259.75 307 268 $6,332,305,262 $2,534,458,619 $8,866,763,880 9.0% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip code (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Calculated using a Census tract level, general building stock (GBS) analysis in Hazus 5.1 (4) Calculated using an Advanced Engineering Building Model (AEBM) analysis in Hazus 5.

Jurisdiction
Estimated Exposure Economic Impact
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Flood ‐ 100‐Year Total Number of
Residential Buildings
(2)
Zip Code 90802 42,525 11,283 10,504 $12,555,654,893 5 0 0.0% $35,229,253 $35,229,253 $70,458,507 0.6% Zip Code 90803 32,849 11,659 11,269 $8,165,722,867 2,238 6,136 18.7% $975,497,634 $645,488,487 $1,620,986,121 19.9% Zip Code 90804 39,045 7,615 7,026 $5,898,611,853 0 0 0.0% $0 $0 $0 0.0% Zip Code 90805 95,610 18,133 16,655 $14,450,879,171 0 0 0.0% $0 $0 $0 0.0% Zip Code 90806 41,547 8,157 7,372 $7,082,584,420 0 0 0.0% $0 $0 $0 0.0% Zip Code 90807 32,687 9,772 9,097 $8,037,885,102 0 0 0.0% $0 $0 $0 0.0% Zip Code 90808 38,395 13,462 13,020 $10,569,261,412 0 0 0.0% $0 $0 $0 0.0% Zip Code 90810 30,604 5,890 5,492 $6,861,632,043 3 0 0.0% $47,760,201 $47,760,201 $95,520,402 1.4% Zip Code 90813 53,238 8,396 6,676 $10,398,406,550 831 112 0.2% $1,104,776,929 $1,377,254,916 $2,482,031,845 23.9% Zip Code 90814 19,359 5,739 5,450 $3,388,248,062 1 0 0.0% $1,234,970 $1,234,970 $2,469,940 0.1% Zip Code 90815 40,937 13,180 12,825 $10,307,061,812 6 0 0.0% $11,794,563 $11,794,563 $23,589,126 0.2% Other 2,098 154 18 $769,831,842 0 0 0.0% $0 $0 $0 0.0%
Total 468,894 113,440 105,404 $98,485,780,029 3,084 6,248 1.3% $2,176,293,551 $2,118,762,390 $4,295,055,941 4.4% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip codes. (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Percent of residential buildings exposed multiplied by the Estimated Population (4) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5. (5) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5.1, and adjusted to reflect the estimated populati o
(6) Calculated using a user-defined (UDF) analysis in Hazus 5.1 Jurisdiction Estimated Population
(1)
Total Number of
Buildings (2)
Total Building Value
(Structure and contents in $)
(2)
Estimated Building Exposure
Buildings Exposed (2) Population Exposed (3) % of Population Exposed
Value Structure in $
Exposed
(2)
Value Contents in $
Exposed
(2)
Value (Structure and
contents in $) Exposed
(2)
% of Total Value
Exposed
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Flood ‐ 100‐Year Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
0 0 0 1 $221,136 $221,136 $442,272 0.0%
1,575 3,065 246 1,431 $30,203,927 $29,836,901 $60,040,828 0.7% 0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
5,024 0 0 2 $16,630,641 $18,104,428 $34,735,069 0.5%
1,423 25 5 534 $24,690,230 $51,500,055 $76,190,285 0.7% 7 0 0 1 $174,224 $904,185 $1,078,409 0.0%
244 0 0 6 $2,631,254 $11,794,560 $14,425,814 0.1%
0 0 0 0 $0 $0 $0 0.0%
8,272 3,091 251 1,975 $74,551,413 $112,361,265 $186,912,678 0.2% Displaced
Population (5)
People Requiring
Short-Term Shelter
(5)
Economic Impact
Buildings Impacted
(6)
Value Structure in $
Damaged
(6)
Value Contents in $
Damaged
(6)
Total Value (Structure and
Contents in $) Damaged
(6)
% of Total Value
Damaged
Structure Debris
(Tons) (4)
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Flood ‐ 100‐Year Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
Residential Commercial Industrial Agriculture Religion Government Education Total 4,698 0 3 0 0 0 2 0 5
1,521 2,105 119 0 0 3 9 2 2238
0 0 0 0 0 0 000
119 0 0 0 0 0 0 0 0
129 0 0 0 0 0 0 0 0
1 4 0 0 0 0 0 000
8 1 0 0 0 0 0 000
9 9 0 3 0 0 0 003
799 14 253 547 0 0 17 0 831
2 3 0 1 0 0 0 001
192 0 0 0 0 0 6 0 6
0 0 0 0 0 0 000
7,675 2,119 379 547 0 3 34 2 3084
Number of Structures in Floodplain (2)
Acres of
Floodplain
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Flood ‐ 500‐Year Total Number of
Residential Buildings
(2)
Zip Code 90802 42,525 11,283 10,504 $12,555,654,893 5 0 0.0% $35,229,253 $35,229,253 $70,458,507 0.6% Zip Code 90803 32,849 11,659 11,269 $8,165,722,867 3,136 8,707 26.5% $1,369,726,802 $850,940,125 $2,220,666,927 27.2% Zip Code 90804 39,045 7,615 7,026 $5,898,611,853 131 611 1.6% $46,406,020 $27,695,999 $74,102,019 1.3% Zip Code 90805 95,610 18,133 16,655 $14,450,879,171 0 0 0.0% $0 $0 $0 0.0% Zip Code 90806 41,547 8,157 7,372 $7,082,584,420 0 0 0.0% $0 $0 $0 0.0% Zip Code 90807 32,687 9,772 9,097 $8,037,885,102 0 0 0.0% $0 $0 $0 0.0% Zip Code 90808 38,395 13,462 13,020 $10,569,261,412 0 0 0.0% $0 $0 $0 0.0% Zip Code 90810 30,604 5,890 5,492 $6,861,632,043 3 0 0.0% $47,760,201 $47,760,201 $95,520,402 1.4% Zip Code 90813 53,238 8,396 6,676 $10,398,406,550 972 1,108 2.1% $1,154,083,563 $1,403,722,024 $2,557,805,587 24.6% Zip Code 90814 19,359 5,739 5,450 $3,388,248,062 1 0 0.0% $1,234,970 $1,234,970 $2,469,940 0.1% Zip Code 90815 40,937 13,180 12,825 $10,307,061,812 6 0 0.0% $11,794,563 $11,794,563 $23,589,126 0.2% Other 2,098 154 18 $769,831,842 0 0 0.0% $0 $0 $0 0.0%
Total 468,894 113,440 105,404 $98,485,780,029 4,254 10,427 2.2% $2,666,235,372 $2,378,377,135 $5,044,612,507 5.1% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip codes. (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Percent of residential buildings exposed multiplied by the Estimated Population (4) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5. (5) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5.1, and adjusted to reflect the estimated populati o
(6) Calculated using a user-defined (UDF) analysis in Hazus 5.1 Jurisdiction Estimated Population
(1)
Total Number of
Buildings (2)
Total Building Value
(Structure and contents in $)
(2)
Estimated Building Exposure
Buildings Exposed (2) Population Exposed (3) % of Population Exposed
Value Structure in $
Exposed
(2)
Value Contents in $
Exposed
(2)
Value (Structure and
contents in $) Exposed
(2)
% of Total Value
Exposed
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Flood ‐ 500‐Year Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
0 0 0 1 $221,132 $221,132 $442,265 0.0%
1,779 5,165 351 1,671 $31,439,369 $30,994,410 $62,433,779 0.8% 10 116 18 47 $98,167 $172,208 $270,375 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
5,024 0 0 2 $16,630,673 $18,104,459 $34,735,132 0.5%
1,586 238 33 567 $24,744,604 $51,575,769 $76,320,372 0.7% 7 0 0 1 $174,223 $904,182 $1,078,405 0.0%
244 0 0 6 $2,631,252 $11,794,560 $14,425,812 0.1%
0 0 0 0 $0 $0 $0 0.0%
8,650 5,519 402 2,295 $75,939,419 $113,766,720 $189,706,139 0.2% Displaced
Population (5)
People Requiring
Short-Term Shelter
(5)
Economic Impact
Buildings Impacted
(6)
Value Structure in $
Damaged
(6)
Value Contents in $
Damaged
(6)
Total Value (Structure and
Contents in $) Damaged
(6)
% of Total Value
Damaged
Structure Debris
(Tons) (4)
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Flood ‐ 500‐Year Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
Residential Commercial Industrial Agriculture Religion Government Education Total 4,698 0 3 0 0 0 2 0 5
1,613 2,987 132 0 0 3 12 2 3136
19 110 21 0 0 0 0 0 131
119 0 0 0 0 0 0 0 0
129 0 0 0 0 0 0 0 0
1 4 0 0 0 0 0 000
8 1 0 0 0 0 0 000
9 9 0 3 0 0 0 003
817 139 269 547 0 0 17 0 972
2 3 0 1 0 0 0 001
193 0 0 0 0 0 6 0 6
0 0 0 0 0 0 000
7,803 3,236 429 547 0 3 37 2 4254
Number of Structures in Floodplain (2)
Acres of
Floodplain
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Dam Failure ‐ Combined Dams Total Number of
Residential Buildings
(2)
Zip Code 90802 42,525 11,283 10,504 $12,555,654,893 35 73 0.2% $113,188,211 $109,771,570 $222,959,781 1.8% Zip Code 90803 32,849 11,659 11,269 $8,165,722,867 6,393 18,020 54.9% $2,859,026,375 $1,742,066,507 $4,601,092,882 56.3% Zip Code 90804 39,045 7,615 7,026 $5,898,611,853 480 2,417 6.2% $366,472,892 $275,048,484 $641,521,376 10.9% Zip Code 90805 95,610 18,133 16,655 $14,450,879,171 17,510 92,263 96.5% $7,660,390,083 $5,946,744,628 $13,607,134,711 94.2% Zip Code 90806 41,547 8,157 7,372 $7,082,584,420 4,378 23,203 55.8% $1,594,217,433 $1,020,395,907 $2,614,613,340 36.9% Zip Code 90807 32,687 9,772 9,097 $8,037,885,102 460 1,628 5.0% $145,208,576 $82,221,374 $227,429,950 2.8% Zip Code 90808 38,395 13,462 13,020 $10,569,261,412 13,291 38,189 99.5% $5,283,339,680 $3,742,372,177 $9,025,711,857 85.4% Zip Code 90810 30,604 5,890 5,492 $6,861,632,043 5,043 26,436 86.4% $2,789,340,646 $2,306,445,453 $5,095,786,100 74.3% Zip Code 90813 53,238 8,396 6,676 $10,398,406,550 1,182 2,440 4.6% $1,437,008,087 $1,631,578,928 $3,068,587,015 29.5% Zip Code 90814 19,359 5,739 5,450 $3,388,248,062 235 806 4.2% $110,034,369 $66,572,140 $176,606,510 5.2% Zip Code 90815 40,937 13,180 12,825 $10,307,061,812 10,677 33,264 81.3% $4,455,492,503 $3,050,580,992 $7,506,073,495 72.8% Other 2,098 154 18 $769,831,842 88 1,166 55.6% $58,695,491 $74,057,200 $132,752,691 17.2% Total 468,894 113,440 105,404 $98,485,780,029 59,772 239,904 51.2% $26,872,414,347 $20,047,855,360 $46,920,269,707 47.6% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip codes. (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Percent of residential buildings exposed multiplied by the Estimated Population (4) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5. (5) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5.1, and adjusted to reflect the estimated populati o
(6) Calculated using a user-defined (UDF) analysis in Hazus5.1 Jurisdiction Estimated Population
(1)
Total Number of
Buildings (2)
Total Building Value
(Structure and contents in $)
(2)
Estimated Building Exposure
Buildings Exposed (2) Population Exposed (3) % of Population Exposed
Value Structure in $
Exposed
(2)
Value Contents in $
Exposed
(2)
Value (Structure and
contents in $) Exposed
(2)
% of Total Value
Exposed
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Dam Failure ‐ Combined Dams Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
1,179 73 3 35 $24,219,688 $41,411,804 $65,631,492 0.5%
115,988 18,005 756 6,323 $1,053,501,079 $902,760,830 $1,956,261,909 24.0% 22,354 2,417 83 447 $77,196,675 $131,838,224 $209,034,899 3.5% 1,312,167 92,263 3,005 17,091 $3,869,762,044 $3,965,683,297 $7,835,445,341 54.2% 39,867 23,203 792 4,341 $416,653,398 $392,152,435 $808,805,833 11.4% 7,847 1,628 64 460 $59,609,614 $37,271,412 $96,881,025 1.2% 337,977 38,109 1,496 13,275 $2,085,025,966 $2,075,127,050 $4,160,153,016 39.4% 7,681 26,436 951 3,497 $93,448,599 $164,330,586 $257,779,186 3.8% 12,117 2,440 78 1,148 $204,878,038 $441,848,750 $646,726,788 6.2% 2,390 806 31 230 $34,585,179 $30,261,215 $64,846,394 1.9% 834,624 33,247 1,318 10,677 $2,767,860,453 $2,319,360,100 $5,087,220,553 49.4% 20,126 1,166 47 88 $37,260,305 $72,106,700 $109,367,005 14.2% 2,714,318 239,793 8,624 57,612 $10,724,001,039 $10,574,152,402 $21,298,153,441 21.6% Displaced
Population (5)
People Requiring
Short-Term Shelter
(5)
Economic Impact
Buildings Impacted
(6)
Value Structure in $
Damaged
(6)
Value Contents in $
Damaged
(6)
Total Value (Structure and
Contents in $) Damaged
(6)
% of Total Value
Damaged
Structure Debris
(Tons) (4)
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Dam Failure ‐ Combined Dams Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
Residential Commercial Industrial Agriculture Religion Government Education Total 11,599 18 6 3 0 0 8 0 35
2,363 6,182 172 3 0 7 26 3 6393
100 435 40 0 0 1 2 2 480
4,660 16,072 1,107 196 6 71 29 29 17510
1,261 4,117 245 0 1 7 4 4 4378
244 453 7 0 0 0 0 0 460
4,755 12,950 240 11 1 53 11 25 13291
3,071 4,744 224 15 3 27 15 15 5043
1,351 306 319 528 0 7 21 1 1182
88 227 5 0 0 0 3 0 235
3,555 10,421 176 0 0 38 22 20 10677
231 10 5 0 0 5 2 66 88
33,278 55,935 2546 756 11 216 143 165 59772
Number of Structures in Inundation Area (2)
Acres of
Inundation Area
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated Exposure and Damage: Tsunami Total Number of
Residential Buildings
(2)
Zip Code 90802 42,525 11,283 10,504 $12,555,654,893 2,822 10,842 25.5% $2,197,266,953 $1,795,172,252 $3,992,439,205 31.8% Zip Code 90803 32,849 11,659 11,269 $8,165,722,867 6,587 18,475 56.2% $3,044,546,814 $1,868,940,707 $4,913,487,521 60.2% Zip Code 90804 39,045 7,615 7,026 $5,898,611,853 0 0 0.0% $0 $0 $0 0.0% Zip Code 90805 95,610 18,133 16,655 $14,450,879,171 0 0 0.0% $0 $0 $0 0.0% Zip Code 90806 41,547 8,157 7,372 $7,082,584,420 0 0 0.0% $0 $0 $0 0.0% Zip Code 90807 32,687 9,772 9,097 $8,037,885,102 0 0 0.0% $0 $0 $0 0.0% Zip Code 90808 38,395 13,462 13,020 $10,569,261,412 0 0 0.0% $0 $0 $0 0.0% Zip Code 90810 30,604 5,890 5,492 $6,861,632,043 0 0 0.0% $0 $0 $0 0.0% Zip Code 90813 53,238 8,396 6,676 $10,398,406,550 626 40 0.1% $903,363,708 $1,101,953,763 $2,005,317,471 19.3% Zip Code 90814 19,359 5,739 5,450 $3,388,248,062 362 1,243 6.4% $181,739,858 $105,509,743 $287,249,601 8.5% Zip Code 90815 40,937 13,180 12,825 $10,307,061,812 227 715 1.7% $73,217,984 $41,485,882 $114,703,866 1.1% Other 2,098 154 18 $769,831,842 0 0 0.0% $0 $0 $0 0.0%
Total 468,894 113,440 105,404 $98,485,780,029 10,624 31,315 6.7% $6,400,135,318 $4,913,062,346 $11,313,197,664 11.5% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip codes. (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Percent of residential buildings exposed multiplied by the Estimated Population (4) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5. (5) Calculated using a Census block level, general building stock (GBS) analysis in Hazus 5.1, and adjusted to reflect the estimated populati o
(6) Calculated using a user-defined (UDF) analysis in Hazus 5.1 Jurisdiction Estimated Population
(1)
Total Number of
Buildings (2)
Total Building Value
(Structure and contents in $)
(2)
Estimated Building Exposure
Buildings Exposed (2) Population Exposed (3) % of Population Exposed
Value Structure in $
Exposed
(2)
Value Contents in $
Exposed
(2)
Value (Structure and
contents in $) Exposed
(2)
% of Total Value
Exposed
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated Exposure and Damage: Tsunami Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
44 5,933 498 1,214 $585,159,204 $750,435,723 $1,335,594,927 10.6% 43 16,111 729 5,548 $973,506,737 $824,877,708 $1,798,384,445 22.0% 0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 0 0 0 $0 $0 $0 0.0%
0 11 2 463 $115,427,306 $251,605,161 $367,032,466 3.5%
2 853 46 229 $80,528,908 $51,518,374 $132,047,282 3.9%
1 138 27 132 $18,902,172 $13,240,580 $32,142,752 0.3%
0 0 0 0 $0 $0 $0 0.0%
91 23,047 1,302 7,586 $1,773,524,326 $1,891,677,546 $3,665,201,872 3.7% Displaced
Population (5)
People Requiring
Short-Term Shelter
(5)
Economic Impact
Buildings Impacted
(6)
Value Structure in $
Damaged
(6)
Value Contents in $
Damaged
(6)
Total Value (Structure and
Contents in $) Damaged
(6)
% of Total Value
Damaged
Structure Debris
(Tons) (4)
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated Exposure and Damage: Tsunami Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
Residential Commercial Industrial Agriculture Religion Government Education Total 9,100 2,678 46 21 0 0 76 1 2822
2,578 6,338 202 3 0 9 31 4 6587
0 0 0 0 0 0 000
0 0 0 0 0 0 000
108 0 0 0 0 0 0 0 0
0 0 0 0 0 0 000
0 0 0 0 0 0 000
2 4 0 0 0 0 0 000
937 5 194 402 0 0 25 0 626
130 350 6 0 0 0 6 0 362
206 224 1 0 0 0 2 0 227
1 0 0 0 0 0 000
13,086 9,595 449 426 0 9 140 5 10624
Number of Structures in Hazard Area (2)
Acres of Hazard
Area
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Sea Level Rise 25cm Estimated
Buildings
Exposed (2)
Population
Exposed (4)
% of
Population
Exposed
Value Structure in $
Exposed (2)
Value Contents in $
Exposed (2)
Value (Structure and
contents in $)
Exposed (2)
% of Total
Value
Zip Code 90802 42,525 11,283 10,504 $12,555,654,893 13 0 0.00% 89,028,087 110,168,171 199,196,258 1.59% Zip Code 90803 32,849 11,659 11,269 $8,165,722,867 4,589 12,916 39.32% 1,796,568,624 1,074,796,193 2,871,364,816 35.16% Zip Code 90804 39,045 7,615 7,026 $5,898,611,853 0 0 0.00% 0 0 0 0.00% Zip Code 90805 95,610 18,133 16,655 $14,450,879,171 0 0 0.00% 0 0 0 0.00% Zip Code 90806 41,547 8,157 7,372 $7,082,584,420 0 0 0.00% 0 0 0 0.00% Zip Code 90807 32,687 9,772 9,097 $8,037,885,102 0 0 0.00% 0 0 0 0.00% Zip Code 90808 38,395 13,462 13,020 $10,569,261,412 0 0 0.00% 0 0 0 0.00% Zip Code 90810 30,604 5,890 5,492 $6,861,632,043 0 0 0.00% 0 0 0 0.00% Zip Code 90813 53,238 8,396 6,676 $10,398,406,550 13 0 0.00% 47,567,168 55,768,113 103,335,281 0.99% Zip Code 90814 19,359 5,739 5,450 $3,388,248,062 0 0 0.00% 0 0 0 0.00% Zip Code 90815 40,937 13,180 12,825 $10,307,061,812 0 0 0.00% 0 0 0 0.00% Other 2,098 154 18 $769,831,842 0 0 0.00% 0 0 0 0.00%
Total 468,894 113,440 105,404 98,485,780,029 4,615 12,916 2.75% 1,933,163,879 1,240,732,476 3,173,896,355 3.22% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip codes. (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Sea level rise data provided by Our Coast Our Future (OCOF) (4) Percent of residential buildings exposed multiplied by the Estimated Population Sea Level Rise of 25cm with 100-year Storm Surge (3)
Estimated Exposure
Jurisdiction Estimated
Population (1)
Total Number of
Buildings (2)
Total Number of
Residential Buildings
(2)
Total Building Value
(Structure and
contents in $) (2)
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Sea Level Rise 25cm Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
Residential Commercial Industrial Agriculture Religion Government Education Total 0 3 10 0 0 0 0 13
4,431 140 0 0 3 13 2 4,589
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
0 2 11 0 0 0 0 13
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
4,431 145 21 0 3 13 2 4,615
Number of Structures in Hazard Area (2)
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Sea Level Rise 50cm Estimated
Buildings
Exposed (2)
Population
Exposed (4)
% of
Population
Exposed
Value Structure in $
Exposed (2)
Value Contents in $
Exposed (2)
Value (Structure and
contents in $)
Exposed (2)
% of Total
Value
Zip Code 90802 42,525 11,283 10,504 $12,555,654,893 14 0 0.00% 90,993,848 112,133,931 203,127,779 1.62% Zip Code 90803 32,849 11,659 11,269 $8,165,722,867 5,374 15,143 46.10% 2,174,256,613 1,289,170,241 3,463,426,854 42.41% Zip Code 90804 39,045 7,615 7,026 $5,898,611,853 0 0 0.00% 0 0 0 0.00% Zip Code 90805 95,610 18,133 16,655 $14,450,879,171 0 0 0.00% 0 0 0 0.00% Zip Code 90806 41,547 8,157 7,372 $7,082,584,420 0 0 0.00% 0 0 0 0.00% Zip Code 90807 32,687 9,772 9,097 $8,037,885,102 0 0 0.00% 0 0 0 0.00% Zip Code 90808 38,395 13,462 13,020 $10,569,261,412 0 0 0.00% 0 0 0 0.00% Zip Code 90810 30,604 5,890 5,492 $6,861,632,043 0 0 0.00% 0 0 0 0.00% Zip Code 90813 53,238 8,396 6,676 $10,398,406,550 365 0 0.00% 575,677,979 699,057,432 1,274,735,410 12.26% Zip Code 90814 19,359 5,739 5,450 $3,388,248,062 11 39 0.20% 5,978,262 2,989,131 8,967,393 0.26% Zip Code 90815 40,937 13,180 12,825 $10,307,061,812 0 0 0.00% 0 0 0 0.00% Other 2,098 154 18 $769,831,842 0 0 0.00% 0 0 0 0.00%
Total 468,894 113,440 105,404 98,485,780,029 5,764 15,182 3.24% 2,846,906,702 2,103,350,735 4,950,257,437 5.03% Notes: (1) 2020 Census population totals for zip codes provided by the City of Long Beach. "Other" includes 90822, 90831, and 90840 zip codes. (2) Values based off of 2021 tax assessor data provided by Los Angeles County (3) Sea level rise data provided by Our Coast Our Future (OCOF) (4) Percent of residential buildings exposed multiplied by the Estimated Population Sea Level Rise of 50cm with 100-year Storm Surge (3)
Estimated Exposure
Jurisdiction Estimated
Population (1)
Total Number of
Buildings (2)
Total Number of
Residential Buildings
(2)
Total Building Value
(Structure and
contents in $) (2)
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Estimated  Exposure and Damage: Sea Level Rise 50cm Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
Notes:

Jurisdiction
Residential Commercial Industrial Agriculture Religion Government Education Total 0 3 10 0 0 1 0 14
5,195 150 1 0 7 19 2 5,374
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
00 0 0 0 0 0 0
0 110 241 0 0 14 0 365
11 0 0 0 0 0 0 11
00 0 0 0 0 0 0
00 0 0 0 0 0 0
5,206 263 252 0 7 34 2 5,764
Number of Structures in Hazard Area (2)
Critical Facilities Exposure
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Critical  Facilities Exposure: All Facilities ‐ Count Table All Facilities
Jurisdiction Communications Energy Food, Water,
Shelter
Hazardous
Material Health & Medical Safety  & Security Transportation Total Zip Code 90802 59 13 0 4 3 33 35 147
Zip Code 90803 1 35106 2 9 2 1 75
Zip Code 90804 15 1 24 2 10 15 0 67
Zip Code 90805 13 3 8 10 6 33 33 106
Zip Code 90806 3112 1 0 2 5 1 2 54
Zip Code 90807 1 12425 1 9 1 0 53
Zip Code 90808 9 2 27 3 2 42 28 113
Zip Code 90810 03111 2 2 3 3 61
Zip Code 90813 730 1 56 3 1 1 2 74
Zip Code 90814 1000280 11
Zip Code 90815 23 1 13 2 7 40 49 135
Other 1 6020241 25
Total 170 34 81 41 60 301 234 921
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Critical  Facilities Exposure: Dam Failure ‐ Count Table Dam Failure ‐ Combined Dams
Jurisdiction Communications Energy Food, Water,
Shelter
Hazardous
Material Health & Medical Safety  & Security Transportation Total Zip Code 90802 3401027 17
Zip Code 90803 95103 1 9 2 0 57
Zip Code 90804 0000010 1
Zip Code 90805 13 3 8 10 6 32 23 95
Zip Code 90806 1000550 11
Zip Code 90807 0000000 0
Zip Code 90808 9 2 25 3 2 38 26 105
Zip Code 90810 02101 1 99 32
Zip Code 90813 410 1 2247 30
Zip Code 90814 0000010 1
Zip Code 90815 12 1 10 0 5 29 41 98
Other 0020041 7
Total 51 18 47 26 24 154 134 454
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Critical  Facilities Exposure: Flood 1% Annual Chance Flood ‐ 1% Annual Chance
Jurisdiction Communications Energy Food, Water,
Shelter
Hazardous
Material Health & Medical Safety  & Security Transportation Total Zip Code 90802 3100015 10
Zip Code 90803 500018 1 1 25
Zip Code 90804 0000000 0
Zip Code 90805 0000000 0
Zip Code 90806 0000000 0
Zip Code 90807 0000000 0
Zip Code 90808 0000002 2
Zip Code 90810 0000000 0
Zip Code 90813 110 1 0043 19
Zip Code 90814 0000000 0
Zip Code 90815 000000 1 2 12
Other 0000000 0
Total 9 2 01 0 11 33 36 8
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Critical  Facilities Exposure: Flood 0.2% Annual Chance Flood ‐ 0.2% Annual Chance
Jurisdiction Communications Energy Food, Water,
Shelter
Hazardous
Material Health & Medical Safety  & Security Transportation Total Zip Code 90802 3100015 10
Zip Code 90803 500029 1 2 28
Zip Code 90804 0000000 0
Zip Code 90805 0000000 0
Zip Code 90806 0000000 0
Zip Code 90807 0000000 0
Zip Code 90808 0000002 2
Zip Code 90810 0000000 0
Zip Code 90813 110 1 0043 19
Zip Code 90814 0000000 0
Zip Code 90815 000001 1 2 13
Other 0000000 0
Total 9 2 01 0 21 53 47 2
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Critical  Facilities Exposure: Tsunami ‐ Count Table Tsunami Hazard Area
Jurisdiction Communications Energy Food, Water,
Shelter
Hazardous
Material Health & Medical Safety  & Security Transportation Total Zip Code 90802 34 13 0 3 0 10 33 93
Zip Code 90803 1 24003 2 5 2 0 64
Zip Code 90804 0000000 0
Zip Code 90805 0000000 0
Zip Code 90806 0000001 1
Zip Code 90807 0000000 0
Zip Code 90808 0000000 0
Zip Code 90810 0000000 0
Zip Code 90813 420 1 2034 25
Zip Code 90814 0000040 4
Zip Code 90815 0000017 8
Other 0000000 0
Total 50 19 0 15 3 43 65 195
Risk Ranking
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: EQ ‐ 100‐yr Probabilistic Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0) % Population Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90803 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90804 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90805 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90806 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90807 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90808 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90810 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90813 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90814 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90815 Medium 2 100.00% High 3 9 100.00% High 3 6 Other Medium 2 100.00% High 3 9 100.00% High 3 6
TOTAL Medium 2 100.00% High 3 9 100.00% High 3 6

RISK RANK
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: EQ ‐ 100‐yr Probabilistic Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
TOTAL
% of Total Value
Damaged Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

0.59% Low 1 1 32 Medium

1.54% Low 1 1 32 Medium

2.56% Low 1 1 32 Medium

4.40% Low 1 1 32 Medium

6.02% Medium 2 2 34 High

3.93% Low 1 1 32 Medium

4.40% Low 1 1 32 Medium

6.02% Medium 2 2 34 High

3.93% Low 1 1 32 Medium

0.69% Low 1 1 32 Medium

2.64% Low 1 1 32 Medium

1.47% Low 1 1 32 Medium

3.31% Low 1 1 32 Medium
KING-Earthquake
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: EQ ‐ Compton M7.45 Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0) % Population Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90803 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90804 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90805 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90806 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90807 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90808 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90810 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90813 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90814 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90815 Medium 2 100.00% High 3 9 100.00% High 3 6 Other Medium 2 100.00% High 3 9 100.00% High 3 6
TOTAL Medium 2 100.00% High 3 9 100.00% High 3 6

RISK RANK
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: EQ ‐ Compton M7.45 Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
TOTAL
% of Total Value
Damaged Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

16.92% High 3 3 36 High

15.10% High 3 3 36 High

17.23% High 3 3 36 High

20.19% High 3 3 36 High

25.47% High 3 3 36 High

27.31% High 3 3 36 High

20.19% High 3 3 36 High

25.47% High 3 3 36 High

27.31% High 3 3 36 High

13.56% High 3 3 36 High

17.64% High 3 3 36 High

23.65% High 3 3 36 High

20.59% High 3 3 36 High
KING-Earthquake
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk  Ranking: EQ ‐ Newport Inglewood M7.15 Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0) % Population Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90803 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90804 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90805 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90806 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90807 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90808 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90810 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90813 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90814 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90815 Medium 2 100.00% High 3 9 100.00% High 3 6 Other Medium 2 100.00% High 3 9 100.00% High 3 6
TOTAL Medium 2 100.00% High 3 9 100.00% High 3 6

RISK RANK
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk  Ranking: EQ ‐ Newport Inglewood M7.15 Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
TOTAL
% of Total Value
Damaged Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

13.32% High 3 3 36 High

14.10% High 3 3 36 High

14.28% High 3 3 36 High

14.41% High 3 3 36 High

21.86% High 3 3 36 High

22.53% High 3 3 36 High

14.41% High 3 3 36 High

21.86% High 3 3 36 High

22.53% High 3 3 36 High

11.90% High 3 3 36 High

14.81% High 3 3 36 High

18.90% High 3 3 36 High

16.61% High 3 3 36 High
KING-Earthquake
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: EQ ‐ Palos Verde M7.38 Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0) % Population Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90803 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90804 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90805 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90806 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90807 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90808 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90810 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90813 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90814 Medium 2 100.00% High 3 9 100.00% High 3 6 Zip Code 90815 Medium 2 100.00% High 3 9 100.00% High 3 6 Other Medium 2 100.00% High 3 9 100.00% High 3 6
TOTAL Medium 2 100.00% High 3 9 100.00% High 3 6

RISK RANK
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: EQ ‐ Palos Verde M7.38 Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
TOTAL
% of Total Value
Damaged Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

11.20% High 3 3 36 High

7.14% Medium 2 2 34 High

4.67% Low 1 1 32 Medium

5.97% Medium 2 2 34 High

14.24% High 3 3 36 High

17.60% High 3 3 36 High

5.97% Medium 2 2 34 High

14.24% High 3 3 36 High

17.60% High 3 3 36 High

5.38% Medium 2 2 34 High

6.17% Medium 2 2 34 High

9.36% Medium 2 2 34 High

9.00% Medium 2 2 34 High
KING-Earthquake
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Flood ‐ 100‐Year Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0)
% Population
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 High 3 0.00% None 0 0 0.56% Low 1 2
Zip Code 90803 High 3 18.68% Medium 2 6 19.85% Medium 2 4 Zip Code 90804 High 3 0.00% None 0 0 0.00% None 0 0
Zip Code 90805 High 3 0.00% None 0 0 0.00% None 0 0
Zip Code 90806 High 3 0.00% None 0 0 0.00% None 0 0
Zip Code 90807 High 3 0.00% None 0 0 0.00% None 0 0
Zip Code 90808 High 3 0.00% None 0 0 0.00% None 0 0
Zip Code 90810 High 3 0.00% None 0 0 1.39% Low 1 2
Zip Code 90813 High 3 0.21% Low 1 3 23.87% Medium 2 4
Zip Code 90814 High 3 0.00% None 0 0 0.07% Low 1 2
Zip Code 90815 High 3 0.00% None 0 0 0.23% Low 1 2
Other High 3 0.00% None 0 0 0.00% None 0 0
Total High 3 1.33% Low 1 3 4.36% Low 1 2
RISK RANKING-Flood - 100-Year
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Flood ‐ 100‐Year Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
% of Total Value
Damaged
Impact (High,
Medium, Low,
None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

0.00% None 0 0 6L o w

0.74% Low 1 1 33 High

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.51% Low 1 1 9L o w

0.73% Low 1 1 24 Medium

0.03% Low 1 1 9L o w

0.14% Low 1 1 9L o w

0.00% None 0 0 0L o w

0.19% Low 1 1 18 Medium
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Flood ‐ 500‐Year Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0)
% Population
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 0.00% None 0 0 0.56% Low 1 2
Zip Code 90803 Medium 2 26.51% High 3 9 27.19% High 3 6 Zip Code 90804 Medium 2 1.57% Low 1 3 1.26% Low 1 2
Zip Code 90805 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90806 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90807 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90808 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90810 Medium 2 0.00% None 0 0 1.39% Low 1 2
Zip Code 90813 Medium 2 2.08% Low 1 3 24.60% Medium 2 4 Zip Code 90814 Medium 2 0.00% None 0 0 0.07% Low 1 2
Zip Code 90815 Medium 2 0.00% None 0 0 0.23% Low 1 2
Other Medium 2 0.00% None 0 0 0.00% None 0 0
Total Medium 2 2.22% Low 1 3 5.12% Low 1 2
RISK RANKING-Flood - 500-Year
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Flood ‐ 500‐Year Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
% of Total Value
Damaged
Impact (High,
Medium, Low,
None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

0.00% None 0 0 4L o w

0.76% Low 1 1 32 Medium

0.00% None 0 0 10 Lo w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.51% Low 1 1 6L o w

0.73% Low 1 1 16 Medium

0.03% Low 1 1 6L o w

0.14% Low 1 1 6L o w

0.00% None 0 0 0L o w

0.19% Low 1 1 12 Lo w
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Dam Failure ‐ Combined Dams Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0)
% Population
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Low 1 0.17% Low 1 3 1.78% Low 1 2
Zip Code 90803 Low 1 54.86% High 3 9 56.35% High 3 6
Zip Code 90804 Low 1 6.19% Low 1 3 10.88% Medium 2 4
Zip Code 90805 Low 1 96.50% High 3 9 94.16% High 3 6
Zip Code 90806 Low 1 55.85% High 3 9 36.92% High 3 6
Zip Code 90807 Low 1 4.98% Low 1 3 2.83% Low 1 2
Zip Code 90808 Low 1 99.46% High 3 9 85.40% High 3 6
Zip Code 90810 Low 1 86.38% High 3 9 74.26% High 3 6
Zip Code 90813 Low 1 4.58% Low 1 3 29.51% High 3 6
Zip Code 90814 Low 1 4.17% Low 1 3 5.21% Low 1 2
Zip Code 90815 Low 1 81.26% High 3 9 72.82% High 3 6
Other Low 1 55.56% High 3 9 17.24% Medium 2 4
Total Low 1 51.16% High 3 9 47.64% High 3 6
RISK RANKING-Dam Failure - Combined Dams
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Dam Failure ‐ Combined Dams Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
% of Total Value
Damaged
Impact (High,
Medium, Low,
None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

0.52% Low 1 1 6L o w

23.96% High 3 3 18 Medium

3.54% Low 1 1 8L o w

54.22% High 3 3 18 Medium

11.42% High 3 3 18 Medium

1.21% Low 1 1 6L o w

39.36% High 3 3 18 Medium

3.76% Low 1 1 16 Medium

6.22% Medium 2 2 11 Lo w

1.91% Low 1 1 6L o w

49.36% High 3 3 18 Medium

14.21% High 3 3 16 Medium

21.63% High 3 3 18 Medium
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Tsunami Probability (High,
Medium, Low, None)
Probability Factor
(3,2,1,0)
% Population
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
% of Total Value
Exposed
Impact (High, Medium,
Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 25.50% High 3 9 31.80% High 3 6 Zip Code 90803 Medium 2 56.24% High 3 9 60.17% High 3 6 Zip Code 90804 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90805 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90806 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90807 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90808 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90810 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90813 Medium 2 0.07% Low 1 3 19.28% Medium 2 4 Zip Code 90814 Medium 2 6.42% Low 1 3 8.48% Low 1 2
Zip Code 90815 Medium 2 1.75% Low 1 3 1.11% Low 1 2
Other Medium 2 0.00% None 0 0 0.00% None 0 0
Total Medium 2 6.68% Low 1 3 11.49% Medium 2 4
RISK RANKING-Tsunami
Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Tsunami Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
% of Total Value
Damaged
Impact (High,
Medium, Low,
None) Impact Factor
Weighted Impact
Factor Risk Ranking Score Hazard Risk Rating

10.64% High 3 3 36 High

22.02% High 3 3 36 High

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

3.53% Low 1 1 16 Medium

3.90% Low 1 1 12 Lo w

0.31% Low 1 1 12 Lo w

0.00% None 0 0 0L o w

3.72% Low 1 1 16 Medium
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Sea Level Rise 25cm Probability (High,
Medium, Low,
None)
Probability Factor
(3,2,1,0)
% Population
Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted
Impact Factor
% of Total
Value Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 0.00% None 0 0 1.59% Low 1 2
Zip Code 90803 Medium 2 39.32% High 3 9 35.16% High 3 6 Zip Code 90804 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90805 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90806 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90807 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90808 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90810 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90813 Medium 2 0.00% None 0 0 0.99% Low 1 2
Zip Code 90814 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90815 Medium 2 0.00% None 0 0 0.00% None 0 0
Other Medium 2 0.00% None 0 0 0.00% None 0 0
Total Medium 2 2.75% Low 1 3 3.22% Low 1 2
RISK RANKING - Sea Level Rise of 25cm with 100-year Storm S Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Sea Level Rise 25cm Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
% of Total
Value
Damaged
Impact (High,
Medium, Low,
None) Impact Factor
Weighted
Impact Factor
Risk Ranking
Score
Hazard Risk
Rating

1.59% Low 1 1 6L o w

35.16% High 3 3 36 High

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.99% Low 1 1 6L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

3.22% Low 1 1 12 Lo w
Surge (3)
Impact on Economy
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Sea Level Rise 50cm Probability (High,
Medium, Low,
None)
Probability Factor
(3,2,1,0)
% Population
Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted
Impact Factor
% of Total
Value Exposed
Impact (High,
Medium, Low, None) Impact Factor
Weighted Impact
Factor
Zip Code 90802 Medium 2 0.00% None 0 0 1.62% Low 1 2
Zip Code 90803 Medium 2 46.10% High 3 9 42.41% High 3 6 Zip Code 90804 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90805 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90806 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90807 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90808 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90810 Medium 2 0.00% None 0 0 0.00% None 0 0
Zip Code 90813 Medium 2 0.00% None 0 0 12.26% Medium 2 4 Zip Code 90814 Medium 2 0.20% Low 1 3 0.26% Low 1 2
Zip Code 90815 Medium 2 0.00% None 0 0 0.00% None 0 0
Other Medium 2 0.00% None 0 0 0.00% None 0 0
Total Medium 2 3.24% Low 1 3 5.03% Low 1 2
RISK RANKING - Sea Level Rise of 50cm with 100-year Storm S Probability Impact on People Impact on Property
City of Long Beach Natural Hazard Mitigation Plan Appendix  C. Detailed Risk Assessment Results Risk Ranking: Sea Level Rise 50cm Zip Code 90802
Zip Code 90803
Zip Code 90804
Zip Code 90805
Zip Code 90806
Zip Code 90807
Zip Code 90808
Zip Code 90810
Zip Code 90813
Zip Code 90814
Zip Code 90815
Other
Total
% of Total
Value
Damaged
Impact (High,
Medium, Low,
None) Impact Factor
Weighted
Impact Factor
Risk Ranking
Score
Hazard Risk
Rating

1.62% Low 1 1 6L o w

42.41% High 3 3 36 High

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

12.26% High 3 3 14 Lo w

0.26% Low 1 1 12 Lo w

0.00% None 0 0 0L o w

0.00% None 0 0 0L o w

5.03% Medium 2 2 14 Lo w
Surge (3)
Impact on Economy

City of Long Beach Hazard Mitigation Plan
Appendix D. Status of Actions Identified in
Previous Hazard Mitigation Plan

D-1
D. STATUS OF ACTIONS IDENTIFIED IN PREVIOUS HAZARD

MITIGATION PLAN
The 2017 City of Long Beach Hazard Mitigation Plan action items were reviewed for the current update, and for each action it was determined whether the action had been completed, was in progress, or had not been started. Incomplete actions were reviewed to determine if they should be carried over to the 2022 update or removed from the plan due to a change in priorities, capabilities, or feasibility. The table below lists the status of all actions from the 2017 plan.

Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-1 Continue to integrate the goals and action items from the Hazard Mitigation Plan (Plan) into existing regulatory documents and programs, where appropriate. 
Comment: This is completed on a yearly basis
Action MH-2 Identify and pursue funding opportunities to develop and implement local mitigation activities.

Comment: The Earthquake Early Warning system application was submitted in June of 2021 and is currently undergoing the approval process with FEMA. The flood mitigation application was denied by CalOES HMP Grant Program, but is being carried over by Public Works as new action items as they identify funding for it.

Action MH-3 Monitor and evaluate Citywide mitigation activities. Committee would likely include Fire and Police Chiefs, Directors of Development Services, Technology Services, Public Works, and Disaster Preparedness and Emergency Communications. 
Comment: No longer needed
Action MH-4 Identify, improve, and sustain collaborative programs to: educate the community, develop or enhance partnerships, coordinate emergency responses, and mitigate the risks of City departments as well as our community. These programs include our public/private partners, local area volunteer organizations and agencies as needed.

Partners will provide and share subject matter experts for the development of reasonable mitigation programs and projects.

Comment: Take part in Community Partner meetings (with businesses and non-profits) Action MH-5 Develop public and private partnerships to foster natural hazard mitigation program coordination and collaboration in the City.

Comment: Take part in Community Partner meetings (with businesses and non-profits) Action MH-6 Update inventory of at-risk City-owned critical facilities including buildings and infrastructure. Develop photo inventories, building asset lists, and equipment lists. 
Comment: Completed during the last plan cycle
City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-2
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-7 Strengthen emergency services preparedness and response by linking emergency services with natural hazard mitigation programs and enhancing public education on a local scale.

Comment: Yearly community outreach events and CPO meetings Action MH-8 Develop, enhance, and implement education programs aimed at mitigating natural hazards, and reducing the risk to residents, public agencies, private property owners, businesses, and schools.

Comment: Yearly community outreach events and CPO meetings Action MH-9 Use technical knowledge of natural ecosystems and events to link natural resource management and land use organizations to mitigation activities and technical assistance.

Comment: No longer needed
Action MH-10 Update Public Safety Element and Seismic Safety Element of the City’s General Plan
 DS-5
Comment: Development Services is currently working on this Action MH-11 Ensure SEMS-mandated plans, training and exercises are updated and implemented.

Comment: Follow state and federal guidelines for plans, training, and exercises Action MH-12 Expand Mitigation Plan to include man-made hazards (HAZMAT, terrorism, etc.). Thorough hazard analysis will be completed and the man-made risks will be added. 
Comment: Completed in 2017 Hazard Mitigation Plan
Action MH-13 Incorporate the building inventory into the hazard assessment.  Comment: Completed during the last plan cycle
Action MH-14 Ensure compliance to rebuilding in conformance with applicable codes, specifications, and standards.

Comment: Implemented before every new construction and update projects Action MH-15 Ensure repairs or construction funded by Federal disaster assistance conform to applicable codes and standards.

Comment: No longer needed
Action MH-16 Review existing zoning regulations to ensure adequacy in reducing the amount of future development in area with identified hazards. 
Comment: Completed before every new project
Action MH-17 Improve hazard assessment information to make recommendations for discouraging new development and encouraging preventive measures for existing development in areas vulnerable to natural hazards.
 DS-6
Comment: HMP 2015 and 2021
Action MH-18 Use the Mitigation Plan to help the City’s General Plan meet State regulations designed to protect life and property from natural disasters and hazards through planning strategies that restrict development in areas of known hazards. (California Coastal Commission, State Lands Commission)

Comment: Ongoing
Action MH-19 Coordinate and integrate natural hazard mitigation activities, where appropriate, with the City’s Emergency Operations Plan. 
Comment: Ongoing
City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-3
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-20 Identify, improve, and sustain collaborative programs focusing on the real estate and insurance industries, public and private sector organizations, and individuals to avoid activity that increases risk to natural hazards.

Comment: No longer needed
Action MH-21 Maintain list of critical facilities at risk from natural hazards events.  Comment: Completed and maintained on a regular basis by TID and GIS Action MH-22 Recommend revisions to requirements for development within the floodplain, where appropriate.

Comment: Ongoing
Action MH-23 Encourage construction and subdivision design that can be applied to steep slopes to reduce the potential adverse impacts from development. 
Comment: Ongoing
Action MH-24 Identify bridges at risk from flood or earthquake hazards, identify enhancements, and implement projects needed to reduce the risks. City owned properties are priority for the City. Advocacy program needed for other agencies to address non-City owned infrastructure.

Comment: City has developed lists and maps of critical infrastructure. This is an ongoing project. Public Works, Development Services, and GIS team review and edit City maps as necessary. A similar action item has been created for new table.

Action MH-25 Ensure communication and dissemination of natural hazard mitigation information.

Comment: Ongoing
Action MH-26 Review protocol for communications between non-city utility providers and their response teams to assure rapid restoration of services to impacted areas. 
Comment: Ongoing with CPO and County organizations
Action MH-27 Review strategy to maintain all forms of communications and the facilities required to support communications should natural hazards events cause damages.

Comment: Yearly communication drills
Action MH-28 Review Preliminary Damage Assessment process to ensure efficiency and effectiveness.

Comment: Incorporated into EOP. A PDE process was established in the City’s Emergency Operations Plan.

Action MH-29 Maintain communication lines and response protocols between transportation entities (i.e. Public Works, CalTrans, LA County) to prioritize and identify strategies to deal with road problems and traffic control. 
Comment: Ongoing
Action MH-30 Provide new home and property buyers with information on quality redevelopment and safe housing development.

Comment: No longer feasible
Action MH-31 Review City zoning regulations to ensure adequacy of restrictions to reduce future development in high hazard areas.

Comment: Ongoing
Action MH-32 Compile a directory of out-of-area contractors to help with repairs /reconstruction so that restoration occurs in a timely manner. 
Comment: Ongoing
City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-4
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-33 Partner with other organizations and agencies in the community to identify grant programs and foundations that may support mitigation activities. 
Comment: Ongoing. CPO’s meeting, County
Action MH-34 Allocate City resources and assistance to mitigation projects when and where possible to do so. Use the City’s normal budget process to establish the appropriations needed to support mitigation project activities. 
Comment: Currently applying to HMG for funding
Action MH-35 Identify all organizations within the jurisdiction that have programs or interests in natural hazards mitigation.

Comment: CPO’s
Action MH-36 Identify new sources of support such as philanthropic foundations, community foundations, and professional organizations such as the Urban Land Institute or American Planning Association who might be able to provide technical or financial support for recovery planning.

Comment: Ongoing, partnered with the Long Beach Foundation Action MH-37 Identify additional opportunities for partnering with citizens, private contractors, and other jurisdictions to increase availability of resources (equipment, staffing, and expertise) for response efforts.

Comment: Ongoing community outreach
Action MH-38 Encourage development of additional Community Emergency Response Teams (CERT). Expand team development to include business owners/operators. 
Comment: Ongoing, partnership with LBFD
Action MH-39 Familiarize public officials of requirements regarding public assistance for disaster response.

Comment: Ongoing
Action MH-40 Repeat the Community Hazards Mitigation and Preparedness Questionnaire in five years (must be completed prior to start of next Mitigation Plan update). 
Comment: Conducted during HMP update
Action MH-41 Develop Debris Management Plan for future disaster events including supporting documentation and contracts.

Comment: Response activity, future project
Action MH-42 Enhance weather monitoring to attain earlier severe storm warnings.  Comment: Coordination with County and NWS
Action MH-43 Improve communication among the adjoining transportation entities in order to improve coordination of emergency transportation route maintenance. 
Comment: Ongoing, continued meetings with LB Transit
Action MH-44 Establish a committee to work on animal specific evacuation and sheltering needs. The committee will have representatives from all areas of the City including veterinarians, pet store owners, the Humane Society, animal shelters, the Animal Control Division, other agencies and local interested parties.

Comment: Worked with County on Animal Evacuation Annex
Action MH-45 Develop informational literature on recommended disaster response plans and emergency supply kits and for animals/pets and have them available in veterinary clinics and pet stores.

Comment: Developed brochures and informational material; Pet Preparedness Month City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-5
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-46 Incorporate the training goals and objectives used by Fire/EMS, Police, Public Works, Health and Human Services in order to foster unified command relationships.

Combine all City Departments/Teams in the process.

Comment: Ongoing trainings and exercises
Action MH-47 Develop mitigation strategies to protect identified at-risk historic properties.  Comment: Implemented in 2021 HMP
Action MH-48 Conduct a full review of the Mitigation Plan and Mitigation Action Items every 5 years. Evaluate the successes, failures, progress toward mitigation goals as outlined in the program. Complete the Community Hazards Mitigation and Preparedness Questionnaire. Review best practices, policies and procedures to identify for new mitigation opportunities.

Comment: Ongoing
Action MH-49 Establish and implement the National Incident Management System (NIMS) in each agency/department.

Comment: Ongoing with every plan update
Action MH-50 Identify water resources management and conservation opportunities.  Comment: Ongoing, implemented by Water department
Action MH-51 Develop a strategy to ensure vehicle access routes to key health care facilities will remain accessible immediately after a disaster. 
Comment: Will work on debris management plant
Action MH-52 Develop inventory of backup power resources (generators) for critical City facilities. Encourage non-city owned and essential facilities (such as hospitals, nursing homes, etc.) to develop a plan to acquire and install emergency generators. Encourage upgrading of resources, as necessary.
 PW-39
Comment: Ongoing, working on backup power for shelter sites. Removed non-city owned aspect of this action due to lack of jurisdiction over private facilities.

Action MH-53 Enhance emergency services to increase the efficiency of mutual aid wildfire response and recovery activities.

Comment: LB is not affected by wildfires
Action MH-54 Enhance response capability of City fire, police, and emergency medical services personnel to meet the special needs of our most vulnerable residents including access and functional needs populations.

Comment: Hired Equity Officer and ADFN coordinators to assist with response planning. The Office of Equity was established in 2020.

The City created the role of Citywide Accessibility Coordinator in 2018, this role now manages the Access and Inclusion Bureau.

Action MH-55 Ensure preventive maintenance programs are in place and appropriately funded to maintain the community’s infrastructure and minimize the potential for system failure because of or during a disaster.

Comment: Ongoing, PW does routine maintenance of infrastructure Action MH-56 Publicize the Emergency Management Institute’s Independent Study Courses available to the public to include but not limited to Emergency Preparedness USA, Hazardous Material: Citizen Orientation, Animals in Disaster, Disaster Mitigation for Homeowners.

Comment: Ongoing, community outreach
City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-6
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-57 Teach CERT classes to interested citizens in the City to assist their neighbors during emergencies. These courses will be taught in various locations throughout the City, utilizing the staff resources including EMS, Fire, Police and external resources including American Red Cross.

Comment: Ongoing, Fire holds CERT courses and trainings Action MH-58 Conduct annual tabletop disaster exercises with police, fire, emergency management, and other disaster response departments and agencies. 
Comment: Ongoing
Action MH-59 Pre-position first response equipment and personnel at large venues during scheduled events.

Comment: Ongoing
Action MH-60 Work with the organizations involved in shelter management (ARC and schools) to share information about local shelters.

Comment: Ongoing, CPO TTX and meetings
Action MH-61 Create and make available information to City residents on “shelter-in-place” procedures.

Comment: Ongoing, conducted by Risk Management
Action MH-62 Utilize Neighborhood Resource Centers for distribution of natural hazard public awareness materials.

Comment: Ongoing, community outreach
Action MH-63 Develop public awareness materials that educate the community on natural and man made hazard preparedness and responses. Share information on how to access resources, materials and self-help agencies available to the public. 
Comment: Ongoing
Action MH-64 Distribute weather-related disaster preparedness literature to all property owners. Include information on tropical storms, high winds, drought, severe storms, etc. 
Comment: Ongoing
Action MH-65 Continue to distribute letters to all property owners on the importance of water conservation and availability of water saving devices for homes. 
Comment: Ongoing, Water Dept.

Action MH-66 Provide business continuity workshops for business owners to learn the importance of disaster mitigation and how to create an emergency operations plan for their businesses.

Comment: Ongoing, information distribution
Action MH-67 Train EMS, Fire, Police, Public Works, Health and Human Services and other support personnel in Unified Command using the National Incident Management System (NIMS) model. By understanding the role of each discipline will result in a cohesive performance of their assigned tasks yielding an overall emergency response that is not only effective, but rapid with optimal outcome.

Comment: Ongoing, TTX and tranings
Action MH-68 Distribution of information on fire safety, smoke alarms and sprinkler systems to homeowners of structures built before 1980.

Comment: Ongoing, community outreach
City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-7
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-69 Maintain and publicize availability of preparedness information and materials at Fire Stations and City Hall. The locations will stock materials that may include:

Emergency Preparedness Guidebook, FEMA’s Are You Ready, and other brochures on disaster supplies kits and plans, etc.

Comment: Ongoing
Action MH-70 Consider expanding the Region I (Local Emergency Preparedness Committee’s (LEPC) responsibilities to include mitigation planning and disaster preparedness education activities.

Comment: Staffing limitations
Action MH-71 Utilize the media for the distribution and publication of hazard information.  Comment: Ongoing, social media and press releases
Action MH-72 Strategize on updating existing emergency preparedness booth to include “how to” mitigation materials. The new booth could include pictures and information, such as those contained in FEMA’s Retrofitting for Homeowners Guide, Elevating Your Flood Prone Home, how to elevate critical structures and utilities and information on the NFIP. 
Comment: Ongoing, community outreach
Action MH-73 Integrate the Mitigation Plan with the Capital Improvement Plans to ensure that development does not encroach on known hazard areas. 
Comment: Ongoing
Action MH-74 Establish City priorities for restoration of the community’s infrastructure/utilities and access to critical public facilities following a disaster. 
Comment: Ongoing, updated annually; critical infrastructure list Action MH-75 Enhance Fire Department’s Speaker’s Bureau to include natural hazard topics.

Comment: Ongoing, LBFD Community Outreach Team
Action MH-76 Create and maintain a database with information to track the status of City- owned or occupied facilities repairs or reconstruction. 
Comment: Ongoing, critical infrastructure list
Action MH-77 Prepare a policy that identifies which types of repairs and/or construction, if any, could temporarily be exempt from local codes or ordinances to expedite post disaster recovery.

Comment: No longer applicable
Action MH-78 Determine capacity in local construction and debris landfills to absorb the estimated inflow of disaster/restoration debris and set up contracts or agreements to use these sites.

Comment: Will develop a debris removal plan
Action MH-79 Coordinate with American Red Cross to deliver a variety of training courses, including: CPR, Basic First Aid, Introduction to Disaster Services, Mass Care, Shelter Operations, babysitting, Healthcare Provider, and pet first-aid at locations throughout the City.

Comment: Ongoing, run by ARC
Action MH-80 Develop a program to educate the public on existing disaster-related self- help agencies and resources available within the City.

Comment: Ongoing, community outreach
City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-8
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-81 Establish website links with outside disaster relief agencies such as the Hospital and County Social Services.

Comment: Ongoing, currently in development
Action MH-82 Post the Mitigation Plan on the City’s website.  Comment: Currently on website
Action MH-83 Utilize the City’s website to share City media releases and create links to share information from agencies such as the American Red Cross, CERT, the LEPC Committee, and volunteer organizations active in disaster relief. 
Comment: Ongoing
Action MH-84 Educate the public about hazards prevalent to their area.  Comment: Ongoing
Action MH-85 Create, update, and deliver multi-media children’s programs that teach safety. Examples of information to be used would be similar to that on the FEMA for Kids CD, the Sparky Fire Safety Program, and/or the American Red Cross’s Masters of Disasters program.

Comment: Ongoing, partnered with Red Cross
Action MH-86 Enhance boater safety materials that are targeted toward severe storms.

Distribute the materials at all local marinas in the City. 
Comment: Provide general preparedness information
Action MH-87 Work with the Visitor and Convention Bureau and business development organization to alert tourists to the potential of natural hazard areas and what to do if a natural hazard occurs during their visit to the City.

Comment: Ongoing, text to sign up program
Action MH-88 Develop and distribute press releases to local media organizations (television, newspapers, radio stations, and internet news services) including disaster preparedness information prior to, during and after a foreseeable event. The same information can be released through social media resources. 
Comment: Ongoing, run by Public Affairs
Action MH-89 Create and deliver public service announcements on personal preparedness as well as mitigation steps and strategies. Develop media plan to share information 
Comment: Ongoing, information shared through LBTV
Action MH-90 Maintain supplies and training associated with use of ATC-20 standards (building inspections following disaster).
 DS-7
Comment: Working on Safety Assessment Program training
Action MH-91 Promote CERT through the Chamber of Commerce to gain business participation.

Comment: Ongoing, CERT promoted on City website
Action MH-92 Develop training on the Mitigation Plan for the Planning Commission and others involved in the development process.

Comment: Ongoing, training staff as plan is developed. Planning staff is involved in the plan development. No need to carry over.

Action MH-93 Maintain list of internal training resources by department and share training opportunities.

Comment: Ongoing, shared by departments as they come up Action MH-94 Ensure adequacy and functionality of the alternate ECOC.  Comment: Ongoing, grant purchases to outfit alternate EOC and backup 9-1-1 City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-9
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-95 Build and maintain new Emergency and Operations Center (ECOC).

Comment: No longer needed
Action MH-96 Maintain database in existing hazard GIS system of all previous lost properties in the City to be used in future mitigation activities. 
Comment: Ongoing, maintained by DS, PW, and GIS
Action MH-97 Continue collection of HAZMAT reports from local facilities to enhance and prepare emergency responders in the event of a “secondary impact” incident at these facilities.

Comment: Ongoing
Action MH-98 Determine how, when, and under what circumstances government will demolish property or structures

Comment: Ongoing, maintained by PW
Action MH-99 Retrofit city owned bridges and tunnels.  PW-41, PW-42
Comment: Carried over as two separate, better defined actions. Large-scale projects to be handled by PW Action MH-100 Incorporate new Mitigation Plan Hazard Analysis into the MHFP Threat Assessment update.

Comment: Updated during the last plan cycle.

Action MH-101 Update the City’s Emergency Operations Plan to conform with State 3-year review requirements

Comment: Ongoing, in progress
Action MH-102 Incorporate the mitigation activities identified in the City’s General Plan into the Mitigation Plan.

Comment: Determined no longer feasible by Development Services Action MH-103 Continue a city wide public outreach and education activities relating to local natural hazards.

Comment: Ongoing, social media, community outreach activities, and city website Action MH-104 Revise the Zoning and/or Subdivision Ordinance to require the utilization of various pervious surfaces within the floodplain in order to reduce storm water runoff. This should include utilizing the use of various pervious surfaces in parking lots in recreational areas near the floodplain.

Comment: Completed by Development Services in 2019
Action MH-105 Upgrade the existing generator and electrical systems at Long Beach Airport.
 AIR-43
Comment: Still a viable action and will be carried over Action MH-106 Install new public address system at Long Beach Airport.  Comment: Completed in 2022
Action MH-107 Replace Long Beach Airport’s existing 1,500 gallon Aircraft Rescue Firefighting vehicle with a 3,000 gallon vehicle and replacement of the existing rapid response fire fighting vehicle with a new rapid response vehicle. 
Comment: No longer feasible
Action MH-108 Complete Americans with Disabilities Act (ADA) building upgrades in various locations throughout the City.
 PW-40
Comment: Ongoing
City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-10
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-109 Complete various structural repairs and improvements to existing critical facilities.
 PW-36,
PW-37
Comment: Split into two separate actions in the update to better define the actions Action MH-110 Design and construct Emergency Communications and Operations Center (ECOC).

Comment: No longer needed. Yearly maintenance is conducted.

Action MH-111 Repair residential streets to correct drainage problems and pavement failure.

Comment: Ongoing, maintained by PW
Action MH-112 Install Opticom unit on traffic signals at prioritized intersections in order to enhance emergency vehicle response times and operational safety by allowing emergency vehicles to pre-empt signal timing.

Comment: Completed in 2020
Action MH-113 Update status of action items in the Hazard Mitigation Plan Matrix on an annual basis.

Comment: Ongoing, completed on an annual basis
Action MH-114 Consider incorporating man-made and technological hazards in future updates to the Mitigation Plan.

Comment: Will be assessed and incorporated into 2021 update Action MH-115 Identify opportunities and funding to establish a Hazardous Materials Team.  Comment: Health has implemented this program and monitors grant opportunities on a yearly basis Action MH-116 Develop tabletop exercises with assistance from Public Safety in order to better identify mapping needs for emergency response situations and EOC activations. 
Comment: Ongoing, Work with GIS team periodically to ensure maps have updated information.

Action MH-117 Coordinate community outreach and education activates with the American Red Cross. Utilize information published by the Red Cross as well as the National Disaster Education Coalition in “Talking About Disasters: Guide for Standard Messages”. http://www.disastereducation.org

Comment: Ongoing, partnership with Red Cross
Action MH-118 Develop a forum for interagency communication and cooperative planning and preparedness activities (DMPC).

Comment: Ongoing, Veoci and ALERTLB.

Action MH-119 Prepare pre-scripted messages for use in emergency response and recovery.

Comment: Messaging developed as part of the Crisis Communications Plan in 2019.

Action MH-120 Include Health and Human Services in all City-wide disaster exercises.  Comment: Ongoing, TTX, trainings, CPO meetings.

Action MH-121 Identify grant opportunities to fund specialized equipment for public health emergency response activities.

Comment: Ongoing, HHS Uses state and federal grants.

Action MH-122 Conduct pharmaceutical dispensing exercises in Long Beach and participate in Operating Area dispensing exercises where possible. 
Comment: Health conducts a yearly MCM exercise.

City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-11
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-123 Conduct regional forums on public health disasters.  Comment: No longer feasible due to staff limitations. DPREP has incorporated HHS into Community Partner meetings.

Action MH-124 Maintain and regularly exercise Health and Human Services staff and functions.

Comment: The Health Department conducts yearly training on various aspects of response.

Action MH-125 Train Health and Human Services staff on ICS and SEMS.  Comment: Ongoing, PHEM oversees their department training and conducts yearly training.

Action MH-126 Maintain and regularly exercise Health and Human Services staff and functions. Train community on Health and Human Services’ role in a disaster. 
Comment: Ongoing, PHEM oversees their department training and conducts yearly training.

Action MH-127 Train City’s first responders and community service partners in the Department of Health and Human Services’ disaster response plans. 
Comment: Ongoing, PHEM oversees their department training and conducts yearly training.

Action MH-128 Prepare Mental Health response plan to disasters. Note: County Mental Health Department is the lead and City of Long Beach will assist in the development and oversight of the plan.

Comment: DPrep and Health maintain good communication with County Mental Health to ensure resources are in place after a disaster.

Not year-specific but Health uses MHOAC to make requests for Mental Health services Action MH-129 Develop a Memorandum of Understanding with the American Red Cross on mutual aid with Public Health/City.

Comment: No longer needed.

Action MH-130 Enhance public health communications equipment to meet City’s first response standards.

Comment: Ongoing, use of Veoci, social media, and ALERTLB Action MH-131 Continue to work with first responders on force protection issues for pharmaceutical distribution sites.

Comment: Health works with PD to ensure protection during any pharmaceutical transportation. They also conduct yearly exercises.

Action MH-132 Exercise Health Department evacuation capacity to a disaster event.  Comment: Ongoing, exercises held periodically
Action MH-133 Exercise Health Department’s Department Operations Center in response to natural disaster evacuation exercise.

Comment: Health conducts frequent trainings.

Action MH-134 Maintain Health Department Safety Committee and provide appropriate staff training as determined by City’s Safety Department. 
Comment: Ongoing, HHS oversees committee and trainings as appropriate Action MH-135 Develop and maintain a platform for intra-departmental and inter-agency cooperation.

Comment: Ongoing, Health uses Veoci.

Action MH-136 Develop a process to ensure coordination between PIOs from all City departments.

Comment: Ongoing, PA coordinates City-wide communications meetings.

Action MH-137 Upgrade existing USAR capabilities (done through grants).  Comment: Ongoing, FD receives UASI funds for this purpose.

City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-12
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-138 Upgrade existing EOC with technology to better communicate with the operational area and the public.

Comment: Ongoing, better integration of existing communication methods and upgrades to HAM radio room Action MH-139 Encourage all employees to prepare themselves by understanding their local hazards, stocking up with necessary items, and planning for how family members should respond if any number of possible or emergency or disaster events strike. 
Comment: Ongoing, information provided on city website and citywide communications.

Action MH-140 Acquire, install and/or replace backup generators at city owned critical facilities and essential facilities.

Comment: Ongoing. PRM is currently installing generators at shelter locations.

Action MH-141 Continue enforcement of weight and truck travel restrictions especially as they relate hazardous materials transportation. Specifically provide training, equipment, and administrative support to commercial enforcement efforts. 
Comment: Ongoing, managed by PW
Action MH-142 Prepare a response plan, as well as a training and exercise program for mass casualty incidents involving all modes of transportation to include the investigation of such accidents. Response plans should include all city safety departments. Exercise Plan should include the investigation of large scale incidents. 
Comment: Ongoing, TTX and trainings with City staff. City will begin the development of an evacuation and family assistance center plan.

Action MH-143 Train city staff in the County of Los Angeles’s SNAP program and encourage residents to register for the program.

Comment: Health does this on an ongoing basis.

Action MH-144 Complete Harbor Department Climate Change Study to determine expectations to the Port, impacts to critical infrastructure, and develop further mitigation measures for both short term (current infrastructure) and long term mitigation methods (future construction and/or major modifications.

Comment: No longer feasible
Action MH-145 Continue pilot Electrical Power Assessment to validate current as built electrical grid, and develop contingencies for repower in event of widespread and prolonged loss.

Comment: No longer needed.

Action MH-146 Identify and pursue funding for Harbor District owned bridges that fail to meet current earthquake standards.

Comment: No longer feasible
Action MH-147 Identify, improve, and plan Port Cargo Infrastructure seismic and other hazard retrofit and replacement strategies to oil terminals, cargo facilities, and cargo equipment.
 HD-44
Comment: Still a viable action and needs to be carried over Action MH-148 Develop and identify emergency and contingency fuel supplies and capabilities that can be utilized during regional disruption. Fuel will be needed for emergency and first response vessels/vehicles; salvage vessels: pilot and harbor assist tugs; and for operating backup generators at

Comment: Ongoing, maintained by Energy Resources
City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-13
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-149 Acquire LAR-IAC4 digital aerial data, Oblique Imagery, and updated building data for the City of Long Beach to better analyze hazards 
Comment: Completed in 2017
Action MH-150 Create internet interactive-mapping for the public to view potential natural hazards in their area.

Comment: StoryMap included in 2022 Hazard Mitigation Plan update Action MH-151 Safety Officer should survey and maintain an inventory of city facilities with possible of asbestos containing materials so that in the event of a disaster, emergency responders can take proper precautions prior to entering these locations. 
Comment: No longer feasible
Action MH-152 Update Police Department Emergency Operations Plan to conform to an “all hazards” environment.

Comment: No longer feasible
Action MH-153 Design, engineer, create plan and identify resources to replace continuous power source at Fire HA (operations center) via generator.  FD-19
Comment: Still a viable action that needs to be carried over. Modified action description.

Action MH-154 Develop, equip, and deploy a surge capacity-staffing plan for one additional urban search and rescue (USAR) vehicle.

Comment: No longer feasible
Action MH-155 Ensure the completion of the specific assigned portion of the Emergency Operations Directory including resource information and guidelines for incident management.

Comment: Ongoing, EOC Resource Guide and City Managers Emergency Contacts updated periodically Action MH-156 Develop a comprehensive response plan and protocols to define philosophy, resources, guidelines and contacts for large-scale events such as acts of terrorism or regional disasters.

Comment: Ongoing, plans updated as necessary
Action MH-157 Develop a Memorandum of Understanding with the American Red Cross on emergency response support services such as Mass Care and Sheltering Operations, Communications, Volunteer Assistance, Training, etc.

Comment: Ongoing, MOU is no longer needed.

Action MH-158 Develop a Memorandum of Understanding with the Long Beach Unified School District on emergency response support services such as Feeding Programs for Response Teams, and Mass Care and Sheltering Operations support, Communications, Training, etc.

Comment: High turnover at LBUSD has put a stop on this project. Verbal agreements have been discussed.

Action MH-159 Develop an inventory of emergency communications equipment for City departments to use if traditional communications systems fail. Possible equipment to include satellite phones, radios, or other emerging technologies designed to operate in an emergency response scenario.

Comment: Ongoing, DPREP working with TID to establish inventory lists City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-14
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action MH-160 Develop “Whole Community” program to assist community leaders in preparing their neighborhoods from emergencies. Partner with the American Red Cross to provide training on the “Map Your Neighborhood” program as well as other training courses available to the public. Partner with CERT to provide training to create additional teams in these neighborhoods. Provide personal preparedness information to community leaders to assist them in educating their neighbors.

Comment: Ongoing, The city incorporated the Whole Community approach in all its planning.

Action MH-161 Establish an agreement with other municipal organizations outside of the impacted disaster area (based on the size and intensity of the event) for the relocation of City support functions (HR, Finance, etc.) to an alternative operating location. 
Comment: DPREP has worked with City departments to update their continuity plans which include working from home.

Action MH-162 Provide business owners and operators with workshops to learn the importance of hazard mitigation, continuity of operations and how to create an emergency response plan for their businesses.

Comment: Ongoing, information for businesses and outreach by ED Action EQ-1 Update earthquake hazard mapping data for the City and improve technical analysis of earthquake hazards.

Comment: Additional data will be provided in 2021 update Action EQ-2 Identify funding sources for structural and nonstructural retrofitting of buildings projects. Projects structures must be identified as seismically vulnerable. 
Comment: When available, the city applies for hazard mitigation funding.

Action EQ-3 Conduct seismic strength evaluations of critical facilities in the City to identify vulnerabilities for mitigation of City-owned and occupied, and public infrastructure to meet current seismic standards.

Comment: Ongoing, Development services conducts evaluation when needed.

Action EQ-4 Encourage reduction of non-structural and structural earthquake hazards in homes, schools, businesses, and government offices.

Comment: Ongoing, HMP EEW project and information provided to LBUSD and through ED Action EQ-5 Research and evaluate possibility of adopting retrofitting requirement for different classes of structures.

Comment: Completed in 2018
Action EQ-6 Rehabilitate bridges and coordinates seismic deficiencies noted in the Los Angeles County’s Annual Bridge Inspection Report.

Comment: Removed as written. Rewritten in the update to better capture the action.

Action EQ-7 Seek funding to update the City’s Seismic Safety Element of the General Plan.  Comment: Development Services is currently working on this.

Action EQ-8 Input historical bore locations to complete Earthquake Fault GIS data for use in future Threat Assessments.

Comment: Additional data will be provided in 2021 update Action EQ-9 Encourage seismic retrofitting of unreinforced masonry buildings.  Comment: Ongoing by Development Services
Action EQ-10 Encourage and provide technical information for voluntary retrofitting of existing structures.

Comment: Ongoing through public information.

City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-15
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action EQ-11 Invest in an earthquake early warning system to notify first responders of an eminent earthquake threat and ensure that systems are in place to prepare stations (PD/Fire) for an earthquake (open doors, stop elevators, etc.). 
Comment: Ongoing, EEW project submitted for HMP funding Action EQ-12 Increase public awareness of earthquake mitigation activities.  Comment: Ongoing, community outreach and informational materials provided to community.

Action FLD-1 Develop better flood warning systems. Explore the use of current technology to enhance the system.

Comment: Ongoing, the City has purchased outdoor warning systems that can serve for this purpose.

Action FLD-2 Enhance data and mapping for floodplain information within the City and identify and map flood-prone areas outside of designated floodplains. 
Comment: Additional data will be provided in 2021 update Action FLD-3 Analyze each repetitive flood property within the City and identify feasible mitigation options.

Comment: Additional data will be provided in 2021 update Action FLD-4 Recommend revisions to requirements for development within the floodplain, where appropriate.

Comment: No longer needed
Action FLD-5 Identify surface water drainage obstructions for all parts of the City.  Comment: Public Works conducts routine maintenance on a drainage prior to any storms.

Action FLD-6 Continue to compile and coordinate surface water management plans and data throughout the City.

Comment: Public works updates plans periodically.

Action FLD-7 Enact a local ordinance that prohibits draining, filling, or construction of buildings, roads, or other infrastructure in designated wetlands. This would help to protect the flood-control function of the wetland, preserve water quality, and ensure adequate in- stream flow.

Comment: Ongoing by development services.

Action FLD-8 Research and prepare a policy that identifies measures intended to minimize the risk of coastal erosion. This includes development, construction and daily operations/maintenance measures.

Comment: Ongoing by development services.

Action FLD-9 Distribute information on the National Flood Insurance Program to local businesses in or near the floodplain.

Comment: Ongoing, maintained by Development services.

Action FLD-10 Coordinate in-house training sessions on the regulations associated with NFIP.

Comment: Staffing has limited our involvement in this action.

Action FLD-11 Review the City’s floodplain ordinance to be sure it is in full compliance with the NFIP.

Comment: Ongoing, maintained by DS
Action FLD-12 Encourage acquisition of and management strategies to preserve open space for flood mitigation, bird habitats, and water quality in the floodplain. 
Comment: Ongoing, maintained by DS
City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-16
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action FLD-13 Identify surface water drainage obstructions for all parts of the City.  Comment: Ongoing, maintained by public works.

Action FLD-14 Improve drainage systems for the runways at Long Beach Airport.  Comment: Ongoing maintenance is conducted.

Action FLD-15 Perform a feasibility study for assistance in restoring the estuarine ecosystem of the Colorado Lagoon, improving water quality, managing storm water, and supporting environmental education, safe public recreation, and coastal access. 
Comment: A new action item was written to better meet new priorities.

Action FLD-16 Repair and maintain seawalls in the city  Comment: Ongoing, maintained by public works.

Action FLD-17 Complete structural improvements to storm water/urban runoff systems.  Comment: Ongoing, City has used general fund and has applied for mitigation grants.

Action FLD-18 Regulate construction in designated floodplains via elevation of structures or flood proofing.

Comment: Ongoing, regulated by development services.

Action EM-1 Improve knowledge of earth movement hazard areas and understanding of vulnerability and risk to life and property in hazard-prone areas. 
Comment: Ongoing, maintained by DS
Action EM-2 Research and evaluate possible landslide warning system.  Comment: Ongoing, identifying funding opportunities
Action EM-3 Limit activities in identified potential and historical landslide areas through regulations and public outreach.

Comment: Landslides are not an issue in Long Beach
Action EM-4 Improve knowledge of earth movement hazard areas and understanding of vulnerability and risk to life and property in hazard-prone areas. 
Comment: Landslides are not an issue in Long beach.

Action WS-1 Continue city wide tree trimming programs to keep trees from threatening lives, property, and public infrastructure during windstorm events. 
Comment: Ongoing, conducted by PW
Action WS-2 Encourage electrical utilities to use underground construction methods where possible to reduce power outages from windstorms.

Comment: Electrical grid is provided by SCE.

Action WS-3 Increase public awareness of windstorm mitigation activities.  Comment: Ongoing, social media and community outreach
Action WS-4 Develop codes relating to wind-resistant building siting and construction.  Comment: Ongoing, Requirements set by Development Services Action TSU-1 Secure funding to contract with a consultant to conduct a technical analysis of the tsunami threat.

Comment: In 2021, the Geological Survey updated their flood maps related to tsunamis.

Action TSU-2 Review findings of special research on tsunami threat to Long Beach coastal areas. Amend codes, regulations, and response plans as necessary. 
Comment: Same as above.

City of Long Beach Hazard Mitigation Plan Status of Actions Identified in Previous Hazard Mitigation Plan D-17
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action TSU-3 Train regulatory and response staff in tsunami threat.  Comment: Ongoing, trainings and exercises conducted periodically Action TSU-4 Develop and conduct training and exercises relating to tsunami response.  Comment: Ongoing, trainings and exercises conducted periodically Action TSU-5 Develop a warning system in the City to notify residents of impending tsunami activity.

Comment: Ongoing, purchase of outdoor warning speakers and use of ALERT LB Action TSU-6 Develop a tsunami education campaign to prepare residents.  Comment: Ongoing, social media and community outreach (Tsunami Week) Action PH-1 Establish a process for screening potentially contaminated victims of a public health disaster as a pre-admission requirement prior to being allowed into a Red Cross shelter. Victims of an incident that involves any level of contamination (biological, radiological, or chemical) and thus a public health threat will be assessed and triaged at the secured incident site (red zone).

Comment: Ongoing, maintained by HHS
Action HC-1 Provide training and equipment to effectively deal with civil disturbances  Comment: Ongoing, maintained by LBPD
Action HC-2 Continue to develop an effective information-gathering analysis and sharing capability to enhance event and incident management. Enhance threat assessment sharing and evaluation efforts to deter, prevent, and respond to terrorism events. Evaluate program with training and exercise needs. Sharing should occur between LBPD, LASD, LAPD, USCG, FBI, JRIC, and other regional partners.

Comment: Ongoing, trainings and exercises conducted periodically Action HC-3 Prepare a response plan, as well as a training and exercise program for transportation accidents involving radiological materials. Response plans should include all city safety departments. Training and Exercise Plan should include the investigation of such accidents.

Comment: LBPD conducts regular trainings with Metro and LB Transit..

Action HC-4 Provide assistance to CSULB, LBCC, LBUSD and local private schools in the form of planning, training, and exercises for campuses to minimize school violence.

Encourage school administrators to utilize the latest construction techniques to reduce the threat of school violence.

Comment: Ongoing.

Action HC-5 Heighten Security at public gatherings special events, and critical community facilities and industries.

Comment: Ongoing, maintained by LBPD
Action HC-6 Develop and share information with the public on emergency preparedness tips for periods of civil unrest.

Comment: Ongoing, social media and community outreach
Action HC-7 Develop and present training curriculum to address technological and human caused threats such as cyber-terrorism, “lone wolf” domestic terrorism, utility infrastructure attacks or other possible threat scenarios.

Comment: Ongoing, partnership with TID and L:BPD.

City of Long Beach Hazard Mitigation Plan Status of Ac tions Identified in Previous Hazard Mitigation Plan D-D-18
Action Item
Check if
Completed
Check if no
longer
Feasible or
Removed
Carried Over to
Plan Update
Check
if Yes
Action #
in Update
Action DR-1 Continue to provide property owners, residents and businesses with water conservation tips and information.

Comment: Ongoing, Long Beach Water Department manages the outreach.

Action DR-2 Continue to encourage property owners to landscape with drought resistant materials.

Comment: Ongoing
Action DR-3 Research and prepare City policy requiring future developments and retrofitting of existing City-owned landscaping to be drought resistant and to utilize reclaimed water.

Comment: Ongoing, work done by Long Beach Water.

City of Long Beach Hazard Mitigation Plan
Appendix E. City of Long Beach Adoption
Resolution

E-1
E. CITY OF LONG BEACH ADOPTION RESOLUTION

TO BE PROVIDED WITH FINAL DRAFT

City of Long Beach Hazard Mitigation Plan
Appendix F. Progress Report Template

F-1
F. PROGRESS REPORT TEMPLATE
2022 City of Long Beach Hazard Mitigation Plan
Annual Progress Report

Reporting Period: (Insert reporting period)
Background: The City of Long Beach developed a hazard mitigation plan to reduce risk from all hazards by identifying resources, information, and strategies for risk reduction. The federal Disaster Mitigation Act of 2000 requires state and local governments to develop hazard mitigation plans as a condition for federal disaster grant assistance. To prepare the plan, the City organized resources, assessed risks from natural hazards within the county, developed planning goals and objectives, reviewed mitigation alternatives, and developed an action plan to address probable impacts from natural hazards. By completing this process, these jurisdictions maintained compliance with the Disaster Mitigation Act, achieving eligibility for mitigation grant funding opportunities afforded under the Robert T. Stafford Act. The plan can be viewed online at:
https://www.longbeach.gov/disasterpreparedness/

Summary Overview of the Plan’s Progress: The performance period for the 2022 City of Long Beach Hazard Mitigation Plan became effective in Month Year with the final approval of the plan by FEMA. The initial performance period for this plan will be 5 years, with an anticipated update to the plan to occur before Month Year. As of this reporting period, the performance period for this plan is considered to be __% complete. The hazard mitigation plan has targeted 47 hazard mitigation actions to be pursued during the 5-year performance period. As of the reporting period, the following overall progress can be reported:
• __ out of 47 actions (__%) reported ongoing action toward completion. • __ out of 47 actions (__%) were reported as being complete. • __ out of 47 actions (___%) reported no action taken.

Purpose: The purpose of this report is to provide an annual update on the implementation of the action plan identified in the 2022 City of Long Beach Hazard Mitigation Plan. The objective is to ensure that there is a continuing and responsive planning process that will keep the hazard mitigation plan dynamic and responsive to the needs and capabilities of the City. This report discusses the following:
• Natural hazard events that have occurred within the last year • Changes in risk exposure within the planning area
City of Long Beach Hazard Mitigation Plan Progress Report Template F-2
• Mitigation success stories
• Review of the action plan
• Changes in capabilities that could impact plan implementation • Recommendations for changes/enhancement.

The Multi-Hazard Mitigation Plan Steering Committee: The Hazard Mitigation Plan Steering Committee, made up of stakeholders within the planning area, reviewed and approved this progress report at its annual meeting held on _____, 202_. It was determined through the plan’s development process that a steering committee would remain in service to oversee maintenance of the plan. At a minimum, the Steering Committee will provide technical review and oversight on the development of the annual progress report. It is anticipated that there will be turnover in the membership annually, which will be documented in the progress reports. For this reporting period, the Steering Committee membership is as indicated in Table 1.

Table 1. Steering Committee Members
Name Title Jurisdiction/Agency

Natural Hazard Events within the Planning Area: During the reporting period, there were __ natural hazard events in the planning area that had a measurable impact on people or property. A summary of these events is as follows:
• __________________________
• __________________________
Changes in Risk Exposure in the Planning Area: (Insert brief overview of any natural hazard event in the planning area that changed the probability of occurrence or ranking of risk for the hazards addressed in the hazard mitigation plan)
Mitigation Success Stories: (Insert brief overview of mitigation accomplishments during the reporting period)
City of Long Beach Hazard Mitigation Plan Progress Report Template F-3
Review of the Action Plan: Table 2 reviews the action plan, reporting the status of each action.

Reviewers of this report should refer to the hazard mitigation plan for more detailed descriptions of each action and the prioritization process.

Address the following in the “status” column of the following table:
• Was any element of the action carried out during the reporting period? • If no action was completed, why?
• Is the timeline for implementation for the action still appropriate? • If the action was completed, does it need to be changed or removed from the action plan?

Table 2. Action Plan Matrix
Action Taken?
(Yes or No) Time Line Priority Status
Status (X,
O,)
Action #__—______________________[description]

Action #__—______________________[description]

Action #__—______________________[description]

Action #__—______________________[description]

Action #__—______________________[description]

Action #__—______________________[description]

Action #__—______________________[description]

Action #__—______________________[description]

Action #__—______________________[description]

Completion status legend:
= Project Completed
O = Action ongoing toward completion
X = No progress at this time
Changes That May Impact Implementation of the Plan: (Insert brief overview of any significant changes in the planning area that would have a profound impact on the implementation of the plan.

City of Long Beach Hazard Mitigation Plan Progress Report Template F-4
Specify any changes in technical, regulatory and financial capabilities identified during the plan’s development)
Recommendations for Changes or Enhancements: Based on the review of this report by the Hazard Mitigation Plan Steering Committee, the following recommendations will be noted for future updates or revisions to the plan:
• __________________________
• __________________________
• __________________________
• __________________________

Public review notice: The contents of this report are considered to be public knowledge and have been prepared for total public disclosure. Copies of the report have been provided to the City Council and to local media outlets, and the report is posted on the City’s website. Any questions or comments regarding the contents of this report should be directed to:

Name
Title
City of Long Beach Department of Disaster Preparedness and Emergency Communications 2990 Redondo Avenue
Long Beach, California 90806
(562) 570-9250
Email: [email protected]

City of Long Beach
411 W. Ocean Blvd.

To request this information in an alternative format or to request a reasonable accommodation, please contact Department of Disaster Preparedness and Emergency Communications at [email protected] or (562) 570-9250. A minimum of three business days is requested to ensure availability. Reasonable attempts will be made to accommodate requests made within less than three business days.

Long Beach, CA 90802
Visit us at www.longbeach.gov
@LongBeachCity

← All documents from this meeting