Text extracted from the city's file for reading and search. Open the original on longbeach.legistar.com. That file is the official record.

CITY OF
LONG
April 11, 2023

HONORABLE MAYOR AND CITY COUNCIL
City of Long Beach
California
RECOMMENDATION:

Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802 (562) 570-6383
C-19
Authorize the City Manager, or designee, to execute a Grant of Easement Deed to Southern California Edison (SCE) for the installation of public utilities located within the City-owned parcel at 330 South Pine Avenue; and,
Accept CEQA Notice of Determination CE-23-028. (District 1)

DISCUSSION
Southern California Edison (SCE) is proposing to install underground electrical conduits to supply power for a future wireless telecommunications facility at 330 South Pine Avenue (Attachment A). The conduit will connect to existing infrastructure to improve wireless connectivity in the area. SCE's work order drawing shows the size and location of the proposed installation (Attachment 8). Additionally, an excavation permit for the installation of the conduit within public property is required to be reviewed and approved by Public Works. To accommodate the electrical conduit, it is necessary that a Grant of Easement be issued to Southern California Edison. The Public Works Department requests the City Council to authorize acceptance of a Grant of Easement Deed to accomplish this purpose.

City staff conducted a review of affected agencies and there were no objections to the proposed easement.

In conformance with the California Environmental Quality Act, Categorical Exemption No.

CE-23-028 was issued on February 21, 2023 (Attachment C).

This matter was reviewed by Deputy City Attorney Vanessa S. Ibarra on March 24, 2023 and by Budget Management Officer Nader Kaamoush on March 23, 2023.

TIMING CONSIDERATIONS
City Council action on this matter is not time critical.

HONORABLE MAYOR AND CITY COUNCIL
April 11 , 2023

Page 2 ends

LEVINE ACT
This item is subject to the Levine Act. The Mayor, Councilmembers, and Commissioners who have received a contribution of more than $250 within 12 months prior from a party, participant, or their representatives involved in this proceeding may do either of the following: (1) disclose the contribution on the record and recuse themselves from this proceeding; OR (2) return the portion of the contribution that exceeds $250 within 30 days from the time the elected official knew or should have known about the contribution and participate in the proceeding.

All parties, participants, and their representatives must disclose on the record of this proceeding any contribution of more than $250 made to the Mayor or any Councilmembers within 12 months prior to the date of the proceeding. The Mayor, Councilmembers, and Commissioners are prohibited from accepting, soliciting, or directing a contribution of more than $250 from a party, participant, or their representatives during a proceeding and for 12 months following the date a final decision is rendered.

FISCAL IMPACT
An easement processing fee in the amount of$ 3,213 was deposited in the General Fund Group in the Public Works Department. This recommendation has no staffing impact beyond the normal budgeted scope of duties and is consistent with existing City Council priorities. There is no local job impact associated with this recommendation.

SUGGESTED ACTION:

Approve recommendation
Respectfully submitted,
Lh

ERIC LOPEZ

DI RECTOR OF PUBLIC WORKS
ATTACHMENTS: A- EASEMENT SKETCH & LEGAL DESCRIPTION
B-SCE WORK ORDER DRAWING 1310118_0.01
C - CATEGORICAL EXEMPTION No. CE-23-028
APPROVED:

THOMAS B. MODICA

CITY MANAGER
,· Attachment A Page 1 of 2

LEGAL DESCRIPTION
IN THE CITY OF LONG BEACH, COUNTY OF LOS ANGELES, STATE OF CALIFORNIA.

A 6.00 FOOT WIDE STRIP OF LAND LYING WITHIN A PORTION OF THE ARTIFICIALLY CREATED LAND

WITHIN THE TIDELANDS AND SUBMERGED LANDS CONVEYED TO THE CITY OF LONG BEACH BY THE STATE OF CALIFORNIA UNDER AN ACT OF MAY 01, 1911, CHAPTER 676, PAGE 1304, AS AMENDED, THE CENTERLINE OF SAID STRIP IS DESCRIBED AS FOLLOWS:

COMMENCING AT THE INTERSECTION OF THE SHORELINE DRIVE EB CONTROL LINE WITH THE CENTERLINE OF PINE A VENUE, AS SHOWN ON AMENDING MAP OF PARCEL MAP NO. 25804, AS PER MAP FILED IN BOOK 308, PAGES 68 THROUGH 76 OF PARCEL MAPS, IN THE OFFICE OF SAID COUNTY RECORDER; THENCE ALONG THE CENTERLINE OF SAID PINE AVENUE, SOUTH 25°41'29" WEST 57.50 FEET; 1HENCE NORTH 64°18'31" WEST 91.00 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTH 25°41 '29" WEST

47.50 FEET; THENCE NORTH 68°19'00" WEST 51.00 FEETT9 A POINT OF ENDING.

THE SIDELINES OF SAID STRIP ARE TO BE PROLONGED OR SHORTENED TO JOIN AT THE ANGLE POINTS.

EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN PUBLIC STREET.

CONTAINING 444 SQUARE FEET, MORE OR LESS.

SUBJECT TO ALL MATTERS OF RECORD, IF ANY.

FOR SKETCH TO ACCOMPANY LEGAL DESCRIPTION, SEE EXHIBIT "B" ATTACHED HERETO AND MADE A PART HEREOF.

Prepared by me or under my supervision:

Dated: .~ • / ~ ,2022
No. C-18619
Exp (e;, ... ~ ....

DSE&O 1996277
TD1740856
Attachment A Page 2 of2

SKETCH TO ACCOMPANY LEGAL DESCRIPTION
POR. OF THE ARTIFICIALL y CREATED LAND .

WITHIN THE TIDELANDS AND SUBMERGED LANDS

CONVEYED TO THE CITY OF LONG BEACH BY THE
STATE OF CALIFORNIA UNDER AN ACT OF MAY 01,
1911, CHAPTER 676, PAGE 1304, AS AMENDED
No. C-1861
Exp t;-3
,¼. I
,k I 30 0 30 60
...... ~~~~~~iiiiiiiiiiiiiiiiiiiiiiii:I
Doted ~, 2022
~m~ ~.

Glenn M. Bakke R.C.E.# 18619 Exp. 6-30-23
,'II- I scale 1"= 30' feet
;q
VJ .

I /
1 LEGEND
r---, DENOTES .

L ___ J SCE EASEMENT AREA = 444 SQ. FT.±
POC = POINT OF COMMENCEMENT
TPOB = TRUE POINT OF BEGINNING
Attachment B Page 1 of2

POLE RISER BEND STANDARD LOCATION
SEE UGS CD 160 CONNECTING TO EXISTING SCE STRUCTURES
WOOD MOULDING WITH #6 (MIN.) WIRE INSIDE 10 lOP.

SOLVENT WELD PIPE CAP ONTO RISER. 00 NOT PERMIT EXCESS CEMENT 10 ENTER CONDUIT. CAP HOG BENO WITH CONCRETE-FlLLEO COUPLING. • Per SCE requirements. customers are not allowed to enter, intercept or tie-in to existing SCE facilities; e.g. structures. equipment. multi-conduit runs/banks, or conductors. These facilities may be energized and the work will only be performed by SCE. Contact the appropriate SCE inspector to schedule on appointment. Customers may connect to an existing conduit stub without a SCE inspector present.
• Multi-conduit runs/banks are runs of conduit in close proximity to each other and other SCE facilities. A conduit :stub is a single empty conduit stub that ls not ln close proximity to other SCE owned facilities. Refer to the work order map for details.
f6(MIN) BARE COPPER------
5/8" X B" COPPERCLAO STEB.

GROUND ROD ANO CLAMP
Root INTERIOR OF lDWER ENO OF ABS RISER
BENO 10 PERMIT A SMOOlH "lRAIISmON FROM
THE CONDUIT TO THE RISER.
2 PLACED 6'(MIN) SEPARATION -------~
! ___ :; ..

WOOD

MOULDING
GROUNDING lYPICAL FOR ----~

BOTH POLE CONAGURATIONS

1. APPROVED RISER BENDS ARE SHOWN ON FOLlDWING TABLE;
ru·n·n·

MINIMUM EARTH COVER OVER
RISER BENO TO BE Mi FOLLOWS;

CONDUIT
SIZE
1•-3•
4•-5•
5•
HOG
COVER
33•
57"
72•
FlBERGLASS
COVER
47•
59•
74•
• Per CPUC/SCE's Rule 15 8.1.A and Rule 16 0.1.A., the customer will provide all necessary excavations ( with the exception of excavation under pads and primary splice boxes), material (including conduit and structures) and encasement, to be utilized In the intercept/tie-in process.
• The customer must adhere to all applicable Cal-OSHA, local, city. state and federal regulations, (including, but not limited to. all necessary shoring and traffic control in place to perform the intercept/tie-in work by SCE's underground civil controctor(s)).
• Intercept/tie-in work must be coordinated with SCE's civil contractors through the Division Inspector /P-Spec to llmlt exposure of excavation(s).

Customer Is responsible for securing excavation(s).

TYPICAL CONDUIT BANK SECTION
SEE UGS CD Y2o 1111' 118
Ill ~

DIRECT BURIAL
Applicants expressly represent and warrant that oil work performed and all material used in meeting Applicants'
obligations herein are free from defects in workmanship and ore in conformity with Southern California Edison
Company's requirements. This warranty :ihall cammence upon receipt by Applicants of the Company's fnal acceptance ond shall expire one year from that date. Applicants agree to promptly correct to the Company's satisfaction and that of any governmental agency having j.Jrisdiction and at Applicanb' expense any breach of this warranty which may become
apparent through Inspection or operation of underground electric sy.rlem by the Company during this warranty period.

WARNING
SIMILAR CONS"lRUCTION FOR FEWER CONDUIT
2 CONDUITS MAX,
1HE EXCAVAlOR MUST TAKE ALL STEPS NECESSARY 10 AVOID
CONTACT YIITH UNDERGROUND FACIUllES v.tilCH MAY RESULT IN IN.lJRY 10 PERSONS OR DAMAGE 10 FACIUllES IN THE AREA.

THE INDICAlEO LOCAllONS OF EDISON UNDERGROUND FACIUTJES, Mi PRO\IIOED, ARE BEUEl{I) 10 BE ACCURAlE. H0\\£'1ER, THE

ANAL DETERMINATION OF EXACT LOCATIONS ANO THE COST OF
REPAIR 10 DAMAGED FACILITlES IS THE RESPONSBILilY OF THE EXCAVAlOR.

D81: Rov. 09/23/09

TYPICAL HANDHOLE INSTALLATION
SEE UGS HP 205
AU. C°"9$ lO BR IDENTIRED 'MlH
"'EDISON'" IN ,;r (MIN) BLOCK
REJ:ESS<l>LEmRS.

TYPICAL ASSEMBLY
(l\1THOUT COVER)
l<JIOCK OUT
(FOUR REQUIRED)
/..,...

TYPICAL COVER
/COVfR
rA
□
·~:~:;;,E:'.";.:>,.~•,t;f•' .. •Y,·~: .. - _; i: r ·~~~ 1"' TYPICAL,
AU. CONOUrn;
L ~~Of~ al\JSHED ROCK
A DiR£CTBURIAI.

CONDUIT LOCATION
NOlES:
lYPE CONDUIT OR HOO
38"' (MIN) RADIUS BEND.

SECTION A-A

1. SEE UGS HP 200 FOR DIMENSIONS OF VARIOUS SIZE HANOHOLES AVAILABLE.

2. RADIUS ANGLE MAY BE REDUCED 10 LESS THAN 90' PRO\IIDING THE PRO.EClED CENTER LINE OF THE CONDUIT CLEARS HANOHOLE OPENING.

3. TWO HOLD 001\11< DEVICES TO BE SUPPLIED WITH EACH HANOHOLE.

D75 REV. 05/09/13
,~
§1
l
"[>"(MIN.)

XIX IX IX

XIX IX IX
NOTE: 6" HOG OR FlBERGLASS RISER BENO SHALL BE USED WHEN SPECIFIED

TIE-IN MADE THROUGH SIDE WALL OF STRUCTURE
(Vault, Manhole, PME. SOE/CST, BURO, Slob Box, Pull Box, PMH) The customer is responsible to trench to the structure entrance point and bring the conduit to within 5' of the structure being entered. The customer is to provide slip coupling and conduit.

FINAL DESIGN

2. 3.

4. 5.

ON THE WORKING DRAWING. SEE UGS AC 702 FOR GROUNDING HOG RISER BENDS.

THE lOP AND BOTTOM OF 3", 4•, 5• OR 6" FIBERGLASS BENDS ARE FURNISHED W11H PERMANENTLY ATTACHED PVC COUPLINGS. ALSO INCLUDED IS A 5• LDNG 3•, 4•, 5• OR 5• SCHEDULE BO PVC SIUB-OUT, SOLVENT WELDED INlO THE lOP COUPLING. SEE UGS CO 166 FOR FIBERGLASS RISER BENO MATERIAL INFORMATION AND SUPPLIERS.

TWO GROUND RODS ARE REQUIRED AT ALL PRIMARY RISER POLES. DRIVE ROOS IN TRENCH BOTTOM WITH 6' MINIMUM SEPARATION IN UNDISTURBED EARTH. LEAVE THE ROD lOPS 3• ABlM. THE TRENCH BOTTOM ANO ATTACH CONTINUOUS GROUND WIRE Wl1H CLAMPS. EXTEND WIRE TO INDICATED lDCATION ON POLE ANO SIUB UP 2' A8(JIE GRADE IN WOOD MOULDING. ALL GROUNDING MATERIALS FURNISHED BY CONlRACTORS. SEE UGS AC 703 FOR APPROVED GROUNDING MATERIALS.

ENCMiEMENT REQUIRED ONLY WHEN CALLEO OUT ON WORKING DRAWING.

PVC RISERS MAY BE SUBSllTUTEll FOR FlBERGLASS FOR STRAIGHT RUNS OF 150' OR LESS IN CONDUIT SIZES 4• ANO UNDER.
076: REV. 02/14/11
DISlRICT
46 - LONG BEACH
l 1ROJtCT NO.
2035739

SERVICE REQUEST
2934001

CIRCUIT/ VOLTAGE
OCANA 12KV
§JB7Pc-f<O.

CHERRY

APPROVED FOR CONSTRUCTION
PROJ. MGR. LAW, DAVID HON
PHONE 909-274-1919
PLANNER MEOINA. GREGG JASON IOESIGNER
PHONE 626-308-6517 GARCIA, MARIVELLA
MSR NO.
lHOMAS GUIDE
CIRCUi"t CODE
PRODUCT-1
1740856-LINE EXTENSION
PROOUCT-2
PR0DUCT-3

ASSOC DESGN
1310118

ASSOC DESGN

ASSOC DESGN
NOTE:

ALL ELECTRICAL DUCTS AND STRUCTURES WILL
CONFORM TO GENERAL ORDER #128 (RULES FOR

CONSTRUCTION OF UNDERGROUND ELECTRICAL
SUPPLY AND COMMUNICATION PRESCRIBED BY lHE

PUBLIC UTILITIES COMMISSION OF THE STA TE
OF CALIFORNIA, JANUARY 2006).

I
INVENlORY MAP 025 4228-5 ,,.P.A. NO. I PROPOSED CONSlRUCTION (LOCATION) r.=============~.1Tl~E=1JjlNLMM,A~D~E;__l!.t!N.I!TOUA,.._S~E~C:QOJiND!2JA~R!:!Y:JHt!!A~N!J;D!t:!HQJOLE~ I I I I I VERIZON SITE# CA002_LBC_LNGBCH_092 If PVC conduit is used, riser bend Installation moy 330 S PINE CUSTOMER-Ol'INED CONDUIT MAlERIAL• AND CONCRETE

ENCASEMENT ARE TO BE INSTALLED IN ACCORDANCE YIITH
EDISON ELECTRICAL SER\IICE REQUIREMENlS.
'SUB.ECT TO APPROVAL BY LOCAL INSPECTION AUTHORITIES
D14: Rev. 01/BS
be made by the customer with prior SCE approval. LONG BEACH, CA 90802 Customer not to remove hondhole cover. If metallic
conduit ls used or handhole cover needs to be removed, f 9/3/2020 M.RANDOlPH G.MEDINA M.GARCIA a SCE Qualified Person must be present. TVDE DATE APPROVED BY CHECKED BY DRAWN BY PAX # SHEET 1 DESIGN\DRWG NO. I Southern California Edison Company 1 OF 2 1310118_0.01
T.LM. DATA:

SIZE KVA CUST % LOAD
EXIST . ...22.... 31.7 _Ji_ .12L_%
PROP. ...22.... ~ _6_ ~%
VOLTAGE DROP: 0.66%
FLICKER FACTOR: JiLA_
PRI. CIRCUIT: OCANA 12KV

UNDERGROUND SERVICE ALERT
Contact USA
SCE Inspection
Contact SCE 48 Hours in advance
for a Pre-Construction meeting
and/or Inspection.

Email: N DPFCS@SCE. COM
Cl: HH
IJ;•~~~Af UTILICOS
Attachment B

FINAL DESIGN

APPROVED FOR CONSTRUCTION
H998A
~~
~
I~
~" /~ /
~-' ·~ \ " ~

PLASTIC

Page 2 ends

VD: 0.66%
TIER: 15
LOAD: 1KW
AMPS: 30A
Dial 811 or 800-422-4133
www.digalert.org/contact lD/f1740856-UNE EXTENSION ~ - ·~' ' ~ \ \ ~ ¾£)~ ... Ip- "-" ~ For Underground Locating
Two Working Days Before You Dig
016: Rev. 05/28/20
PROJECT REQUIREMENTS .(rLN}

EDISON EASEMENT REQUIRED
PWRD 88 REQUIRED

UG CIVIL ONLY WORK ORDER

PERMIT REQUIRED
PERMIT TYPE: ENCROACHMENT

OUTAGE REQUIRED
[ill
IYl
[ill
IYl
[ill
OUTAGE DATE: ____ llME: __

TRAFFIC CONTROL REQUIRED
PED. TRAFIFIC CONTROL REQ'D

CONVEYANCE LETTER REQ'D

ENVIRONMENTAL CLEARANCE REQ'D
CSD 140 (TLM) REQ'D
0124: Rev. 02/08/18
IYl
[ill
[ill
[ill
[ill
EX: V5133998 VAULT
8'X18'X9' 4• Tub TUB SmE
EX: 1- TR UG BT MC DE 25KVA 12KV 120/240 1P+(SOURCEJ
IN: CBL 2-1/0 1-2 AL 3-1/C 600V CLP PLEX 141' (1 runs)
Ml: CBL 2-1/0 1-2 AL 3-1/C 600V CLP PLEX 3' (1 runs)
CF: 97- CM DUCT 2 1/2" TO 4"
CF: 94- CM DUCT FOR EXCAVA llON
Cl: 1- S HH PLAS 1tX30"X15"
CF: 1- SS TAX EXCV CST FOR PLASTIC HH
IN: 1- CNN BAR INS LT DUlY #8-350 1P 4-WAY
CONDUIT RADIUS REQUIREMEN1S:

A: The minimum rad"ws for bends are:
/ "".. -s~J' ~
/ ~. / -<-70h '°""-...,,, ' ; -<[' ,,
,____ ~~- / / ~I ~-G_/; ~
', "'-.~~ .1 / •~ ~,b
' ' ·~ ; / j -<:, ' -0 ~ - , _I ,. CO: DUCT / /
~ a, -,. \ "-,J&:CABLEo.. .· , ~ ;'""'· ;,. ,~- ; ~ ' "~'~ :·/.....____ / / / ..._ ~, ~ ~- : ' AN
, ' , ~ 1 °' ~/ \ / VERIZON TO PLACE WTR HH ·
~
'' '-;;t/;.~';~. ~;i(J .. l &: INSTALL CONDUIT &: CABLE ~' ,:-,.._ ' t ,;1~, '\_ '--;,._",.__ , FROM WTR HH TO SCE HH :::-,..,_ ..______ , ' - "' -y~-3.·, > ~----.,·, j~C~ *TO MAKE CONNECTION* ~,-.,._'. 35• for conduits 'S' in diameter or smaller
489 for conduits 4• and s• in diameter
so• for s• diameter conduit
B: The minimum radius for sweeps are:
36" for conduits 3• in diameter or smaller
lt-s• for comiiib 4• in diameter and lcrger,
unless otherwise noted.
~~t \, A,.8:---.._~--~ I ' "--
So --..... \\,.j c\( ..._ ----~)--~~-:':;;~ ..._ --- ~~ "-. ,- I ; . ' .,.,,~--.::;~!- ...__
~ __ __,/ . , ............,__ .• ~/2, - i~_ u~-.. --"', 1 97' /"t:i .. I . / ', ~--: ~ - . ✓-...S -o --.:..:::.

V998 TO H998A r -" /" ,, /· _ /-·-/~~~
"" ~
IN:144' 2-1/0 1-#2 PLEX / / ~ f ./ '. ~~
TEN 5133998 to Str 2 - 31 LBS EX:6-5" V3980 TO V3998 i / < ........__ \. ; '. - ~ --.___ --..____ TEN Str 2 to 5133998 - 18 LBS EX: 12KV PRIMARY \, .1/ ........__ ·_• .• ,• I . '- -------~ <;>c-....________ '--;?.~ ~ ss~
< ~~
= 0
-------------< ~cl~ ........__ 1--,
"~

DISTRICT
, 46 - LONG BEACH
PRO> MGR. LAW, DAVID HON
PHONE 909-274-1919
PLANNER MEDINA. GREGG JASON !DESIGNER
PHONE 626-308-6517 GARCIA, MARIVELLA
l!I
SOUlliERN CALIFORNIA ~, PROJECT NO. !SERVICE REQUEST MSR NO. PRODUCT-1- ASSOC DESGN EDISON
2035739 2934001 1740856-LINE EXTENSION 1310118
CIRCUIT_/ VOLTAGE lHOMAS GUIDE PRODUCT-2 ASSOC DESGN I
An EDISON INTERNATIONAL compony OCANA 12KV
I
SUB / PG NO. CIRCUIT CODE PRODUCT-3 ASSOC DESGN
CHERRY
INVENlURY MAP 025-4228-5 ,J.P.A. NO. I PROPOSED CONSlRUCllON (LOCATION) I I I I I I VERIZON SITE# CA002_LBC_LNGBCH_092
330 SPINE
SCALE: 1" = 40' LONG BEACH, CA 90802
F I 9/3/2020 I M.RANDOLPH G.MEDINA Iii.CARCIA
40 80 'El DATE I APPROVED BY J CHECKED BY J DRAl'm BY
Southern California Edison Company
PAX fl SHEET
2 OF _2_
DESIGN\DRWG NO.
1310118=0.01

CITY OF

LONG BEACH
Attachment C Development Services
Planning Bureau
411 West Ocean Boulevard, 2nd Floor, Long Beach, CA 90802 562.570.6194
CEQA Notice of Exemption
TO: D Office of Planning & Research
1400 Tenth Street, Room 121
Sacramento, CA 95814
FROM: Department of Development Services
411 W. Ocean Blvd, 3rd Floor
Iii L.A. County Clerk
Environmental Fillings
12400 E. Imperial Hwy., Room 1201 i
Norwalk, CA 90650
Exemption Number: CE-23-028
Long Beach, CA 90802
i I
Project Title (Application Number): SCE Easement at 330 S Pine Ave Project Location - Specific: Parking Lot at 330 S Pine Ave Project Location - City/County: City of Long Beach, Los Angeles County, California Description of Nature, Purpose and Beneficiaries of Project:

An easement to Southern California Edison (SCE) for the installation and maintenance of conduit (public utilities) on city-owned land. The project consists of pulling power from the existing SCE vault located in a city-owned parking lot. Power will be routed 97 feet to a new electrical hand hole placed in the public right-of-way. Construction work includes narrow and shallow trenching, installation of small conduit and fiber, and resurfacing of narrow trenched area. All work would occur in developed and active streets that has previously been disturbed by road and other utility work.

Public Agency Approving Project: City of Long Beach, California Person or Agency Carrying Out Project: Southern California Edison for Verizon Exempt Status: (Check One)
D Ministerial (Sec 21080(b)(1); 15268);
D Declared Emergency (Sec 21080(b)(3); 15269(a));
D Emergency Project (Sec 21080(b)(4); 15269(b)(c));
Iii Categorical Exemption. State type and section number: _1_5_3_0_3_, 1_5_3_0_4 __________ _ D Statutory Exemption. State code number: ___________________ _ Reasons why project is exempt:

This project consists of the minor alteration of a paved parking lot for the installation of public utilities where the surface pavement would be restored upon project completion. The electrical utility extension, including street improvements, are of a minor length to connect to existing infrastructure in the project area. The areas of minor trenching and backfilling would be restored and no vegetation would be modified as part of the project.

Lead Agency
Contact Person: MRryanne Cro~ Contact Phone: 562-570-5683 Signature: /J(Y~~ Date: 2/21/23 Title: Planner