Cities Index.
RES-23-0073.pdf

Long Beach City Council
May 23, 2023

Document
RES-23-0073.pdf
Meeting
May 23, 2023
Body
Long Beach City Council
Pages
48
Original file
863 KB
Text extracted from the city's file for reading and search. Open the original on longbeach.legistar.com. That file is the official record.

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type

PIPELINE AND UTILITIES PERMIT FEES
Annual Pipeline Permit Fee $1.055 Base Rate
(Per Lineal
Foot)
Pipe Size (Internal
Diameter) 18''
Fee
Annual Pipeline Permit Fee $1.172 Base Rate
(Per Lineal
Foot)
Pipe Size (Internal
Diameter) 20''
Fee
Annual Pipeline Permit Fee $1.289 Base Rate
(Per Lineal
Foot)
Pipe Size (Internal
Diameter) 22''
Fee
Annual Pipeline Permit Fee $1.406 Base Rate
(Per Lineal
Foot)
Pipe Size (Internal
Diameter) 24''
Fee
Annual Pipeline Permit Fee $1.523 Base Rate
(Per Lineal
Foot)
Pipe Size (Internal
Diameter) 26''
Fee
Annual Pipeline Permit Fee $1.640 Base Rate
(Per Lineal
Foot)
Pipe Size (Internal
Diameter) 28''
Fee
Annual Pipeline Permit Fee $1.758 Base Rate
(Per Lineal
Foot)
Pipe Size (Internal
Diameter) 30''
Fee

RECORDS SEARCH AND RECORDS COPYING

RECORDS SEARCH
$160/hour; first
15 minutes
free
HourRecords Search -
Technical Assistance
Fee
3M MICROFILM ENLARGEMENT COPIES
3M Microfilm enlargement full size copies $5.30 Copy3M Microfilm Copies Fee

DIRECT COPIES FROM COPY MACHINE
Record Search copiy sizes 8 1/2 X 11; 8 1/2 X
14 & 11 X 17
$0.30 CopyRecords Search Copies Fee

COPIES OF MAPS
Printed copies of Geographic Information
Systems (GIS) Generated Map (36" x 36")
$28 for one
(36"x36")
EachG.I.S Map Fee
24" X 36" COPIES
COPIES MAPS Requests 24" X 36" $5.30 CopyMap Copy Requests Fee

OTHER COPIES
Electronic copy of computer drawing file (.pdf) $1.10 eachDigital/Electronic Copies Fee $18.15 EachMap Books Fee

Page 16 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type

OTHER COPIES
$18.15 Each2400 Scale City Maps Fee
$24.65 Each1800 Scale City Maps Fee
$26.85 Each1200 Scale City Maps Fee

RIGHT OF WAY FEE SCHEDULE
Final fee to cover the processing of a street
vacation.
$4930 Per
Application
Final Street and Alley
Vacation
Fee
Initial fee to cover the processing of a street
vacation.
$6,770 Per
Application
Tentative Street and Alley
Vacation
Fee
This will allow staff to write administrative
citations to entities who fail to comply with the
Peak Hour Ordinance. The Peak Hour
Directive seeks to minimizes impacts to traffic
flow by prohibiting work or obstructions in the
ROW during peak traffic hours (6:00 a.m. to
8:30 a.m. and 3:30 p.m. to 6:30 p.m.).
$100 CitationAdministrative
Right-of-Way Inspection
Citation Fee - First Citation
Penalty
This will allow staff to write administrative
citations to entities who fail to comply with the
Peak Hour Ordinance. The Peak Hour
Directive seeks to minimizes impacts to traffic
flow by prohibiting work or obstructions in the
ROW during peak traffic hours (6:00 a.m. to
8:30 a.m. and 3:30 p.m. to 6:30 p.m.).
$200 CitationAdministrative
Right-of-Way Inspection
Citation Fee - Second
Citation
Penalty
This will allow staff to write administrative
citations to entities who fail to comply with the
Peak Hour Ordinance. The Peak Hour
Directive seeks to minimizes impacts to traffic
flow by prohibiting work or obstructions in the
ROW during peak traffic hours (6:00 a.m. to
8:30 a.m. and 3:30 p.m. to 6:30 p.m.).
$500 CitationAdministrative
Right-of-Way Inspection
Citation Fee - Third
Citation
Penalty
This will allow staff to write administrative
citations to entities who fail to comply with the
Peak Hour Ordinance. The Peak Hour
Directive seeks to minimizes impacts to traffic
flow by prohibiting work or obstructions in the
ROW during peak traffic hours (6:00 a.m. to
8:30 a.m. and 3:30 p.m. to 6:30 p.m.).
$1000 CitationAdministrative
Right-of-Way Inspection
Citation Fee - Fourth
Citation
Penalty
This will allow staff to write administrative
citations to entities who fail to comply with the
Peak Hour Ordinance. The Peak Hour
Directive seeks to minimizes impacts to traffic
flow by prohibiting work or obstructions in the
ROW during peak traffic hours (6:00 a.m. to
8:30 a.m. and 3:30 p.m. to 6:30 p.m.).

Citations can be issued daily.
$5000 CitationAdministrative
Right-of-Way Inspection
Citation Fee - Fifth and
Subsequent Violations
Penalty

Page 17 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
This will allow staff to write administrative
citations to entities who fail to comply with the
Peak Hour Ordinance. The Peak Hour
Directive seeks to minimizes impacts to traffic
flow by prohibiting work or obstructions in the
ROW during peak traffic hours (6:00 a.m. to
8:30 a.m. and 3:30 p.m. to 6:30 p.m.).

Citations can be issued daily. Citations can be
issued daily.
$1,500 or
$2,500 as
determined by
the violation
CitationAdministrative
Right-of-Way Inspection
Citation Fee - Egregious
Violation
Penalty
Plan review of the construction of new
improvements in the public right-of-way.

Includes under sidewalk roof drain and wheel
chair ramp finishing.
$1,200 Per SheetImprovement Plan Review Fee
Fee charged to locate microcells from mobile
service providers on public property
$4470 per
permit (for up
to ten sites)
plus estimate
of costs for
inspection.

Per PermitClass F Wireless
Right-of-Way Facility
Permit
Fee
Review and inspection of the placement of
public art or objects in the public right-of-way.
$1290 plus
estimate of
costs for
inspection.

Per PermitClass B Public Art /
Objects Permit
Fee
Inspection of activity in the public right-of-way. $160 per hour; After Hours:
$185 per hour
(2hr minimum)
Per HourEngineering Inspection -
Improvements in Public
ROW
Fee

PUBLIC WALKWAYS OCCUPANCY PERMITS
Fee to cover permit processing of public
walkway occupancy permits. Sidewalk and
Parklet Permit.
$1375 plus
estimate of
costs for
inspection.

Per PermitClass E Public Walkway
Occupancy Permit -
Sidewalk & Parklet
Fee
Fee to cover appeal processing of public
walkways occupancy permit (includes
Wireless Telecommunications Facilities
Permit).
$2310 AppealEngineering Permit Appeal
- Public Walkways
Occupancy Permit -
Applicant
Fee
Fee to cover appeal processing of public
walkways occupancy permit (includes
Wireless Telecommunications Facilities
Permit).
$1000 AppealEngineering Permit Appeal
- Public Walkways
Occupancy Permit - Third
Party
Fee
Fee to cover permit processing of public
walkway occupancy permits. Permit Renewal.
$760 plus
estimate of
costs for
inspection.

Per PermitClass E Public Walkway
Occupancy Permit -
Renewal
Fee

DOCUMENT PROCESSING
News racks on street corners in violation of
Municipal Code Chapter 14.20 will be removed
and a fee imposed to retrieve news stand.
$505 per Rack RackNews Rack Impound Fee

Page 18 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type

DOCUMENT PROCESSING
Temporary No Parking Signs in Construction
Zone (14"x22")
$40 Per RequestNo Parking Signs Fee
Fee to cover expenses of document
processing.
$3360 Per
Document
Dedication: Street, Alley &
Sidewalk
Fee
Fee to cover expenses of document
processing.
$3120 Per
Document
Easements: Utility & Other
Special Purpose
Fee
Fee to cover expenses of document
processing (Appraised land value component
may be added).
$3120 Per
Document
Easements: Granted by
the City
Fee
Fee to cover expenses of over the counter
document processing; includes minor
agreements, installation and maintenance
agreements, and financial guarantee
agreements.
$2,430 per
agreement
plus actual
costs at the
fully allocated
hourly rates for
inspection and
attorney
review
Per
Agreement
Agreement Processing Fee
Fee to cover expenses of document
processing.
$3120 EachQuitclaim Fee

STREET IMPROVEMENT PERMITS
Fee to cover out of cycle tree trimming by
contractor.
$140 per
request plus
actual contract
costs
EachTree Trimming Out of
Cycle
Fee

TEMPORARY STREET OCCUPANCY PERMITS
Fee for the use of the City right of way for
Concrete Improvements in ROW
$310 per PermitClass A Temporary Street
Occupancy Permits -
Concrete Improvements in
ROW
Fee
Review and inspection of a Class A Temporary
Occupancy Permit for dumpster/pod laydown.
$70 per permitClass A Temporary Street
Occupancy Permits -
Dumpster/Pod/Laydown
Fee
Fee charged for overweight vehicles per
LBMC 10.41. These fees are limited by State
law.

This fee is
$16/trip, OR
$90/year, OR
$67.50
April-Dec, OR
$45 July-Dec,
OR $22.50
Oct-Dec
Trip/Period/
Annual
Overweight Vehicle Fee Fee

STORM WATER MANAGEMENT
NPDES Inspection fee for code enforcement
and compliance inspections of
Industrial/Commercial facilities (I/C).
285 InspectionStorm Water Compliance
Inspection Fee (I/C)
Fee

Page 19 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
NPDES Inspection fee for code enforcement
and compliance inspections of Industrial
facilities with State General NPDES(IGP).
330 InspectionStorm Water Compliance
Inspection Fee (IGP) –
With State
Fee
NPDES Follow-Up Inspection Fee for
Industrial/Commercial Facility (I/C).
250 Follow-up
Inspection
(I/C)
Storm Water Compliance
Follow-up Inspection Fee
(I/C)
Fee
NPDES Follow-Up Inspection Fee for
Industrial Facilities with State General NPDES
Permit (IGP).
295 Follow-up
Inspection
(IGP)
Storm Water Compliance
Follow-up Inspection Fee
(IGP) – With State
Fee
NPDES Notice of Violation , I/C & IGP $295 Notice of
Violation
Storm Water Notice of
Violation Fee
Fee
This fee is charged to persons requesting
assistance for the retrieval of objects from
storm drain catch basins.

Charge the
fully allocated
hourly rates for
all personnel
used plus any
outside costs.
per instanceStormwater Item Retrieval Fee
This fee is charged to persons or businesses
that have violated MC 8.60.111: "Throwing
rubbish and refuse on public right-of-ways or
storm drain system prohibited. No person shall
put, place, sweep, throw, brush, or in any other
manner deposit any refuse, litter, vegetation,
or any other waste in or on any public
right-of-way or any portion of the storm drain
system, including but not limited to streets,
gutters, sidewalks, parkways and alleys." This
fee is designed to reimburse the
Storm/Environmental Compliance Division for
money spent to the contractor for
non-scheduled, emergency-response work.

Charge the
fully allocated
hourly rates for
all personnel
used plus any
outside costs.

Per InstancePollution Abatement Fee Penalty

TRAFFIC ENGINEERING
Plan review of temporary traffic controls
related to an encroachment permit.
$385 Per SheetTraffic Control Plan
Review
Fee
Perform study for feasibility/applicability and
process application.

Deposit with
actual charges
based on
number of
housing units:
1-10 - $2,500
11-50 - $5,000
51-100 -
$7,500
101+ -
$10,000
ApplicationPreferential Parking
Study/Application
Processing
Fee
Application to park in front of a driveway in a
parking impacted area for an exclusive use of
one household.
$95 Per
Driveway
Driveway Parking Permit
Application
Fee

Page 20 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
Annual renewal of the driveway parking
permit.
$55 Per PermitDriveway Parking Annual
Permit
Fee

TRAFFIC OPERATIONS
Painting a restrictive parking curb at the
request of the property owner.
$250 per
location plus
$30 per each
additional
location and
$55 per each
additional sign
LocationCurb Painting on Request Fee
Installation of a streetlight shield by request. $200 Per light shield.

Light Shield Install by
Request
Fee
Installation of additional street light requests,
such as a new foundation, service raceways,
and lighting standards.

Charge the
fully allocated
hourly rates for
all personnel
used plus any
outside costs.

InstanceAdditional Streetlight
Request (includes
Maintenance and
Electricity)
Fee
Paint red curb on the side of driveway at
owner's request with Traffic Engineering
approval.
$225 LocationDriveway Tip - Paint Fee
Repaint red curb on the side of driveway at
owner's request.
$115 LocationDriveway Tip - Repaint Fee
The Department provides a service for
residents upon request where staff will post for
a day or less, no parking signs and place
traffic delineators to reserve parking space for
a moving truck.
$115 Per RequestNo Parking Sign -
Temporary Posting
Fee
Preferential Parking District installed by
petition of neighborhood and Traffic
Engineering approval.
$230 per
request plus
$130 per each
additional sign
after the first
sign
Sign
Installation
Preferential Parking
District Sign
Fee
Temporary removal of parking meter head. $235 for first meter plus $60
per each
additional
meter
plus amount
equal to lost
meter revenue
MeterParking Meter Removal
Fee
Fee

Page 21 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
Temporary removal of parking meter head/s
with post/s.
$295 for first
meter plus
$115 per each
additional
meter
plus amount
equal to lost
meter
revenue.

PostParking Meter Removal
Fee
Fee
Parking meter removed or otherwise taken out
of service.

Amount equal
to lost
revenue, ($/hr
x # metered
hrs. x # days)
MeterParking Meter Out of
Service Fee
Fee
Micro Mobility Permits
Permitting for the Micro Mobility Program
Fee charged for Micro-Mobility vendors to
operate in the City of Long Beach.
$25,000 AnnuallyMicro-Mobility Permit Fee Fee
Fee charged to Micro-Mobility vendors for
each device operating in the City of Long
Beach.
$75/device AnnuallyMicro-Mobility Device Fee Fee
Fee charged to vendors for each trip taken on
each micro-mobility device in the City of Long
Beach.
$0.20/trip Per TripMicro-Mobility Trip Fee Fee
Fee charged to vendors for each required field
inspection of their Micro-Mobility device(s).
$75/inspection Per
Inspection
Micro-Mobility Staff Field
Inspection Fee
Fee
Fee charged to Micro-Mobility vendors for
each unit found non-compliant with the
Micro-Mobility standards discarded in the
Public Right of Way and impounded by the
Department of Public Works. $25/day/vehicle.
$25/day/device
impounded
Per DayMicro-Mobility Daily
Impound Fee
Fee
Fee charged to Micro-Mobility permittee, per
Geofence violations (No parking zone, No ride
zone, Out of hub)
$2.00/violation Per ViolationMicro-Mobility
Non-Compliance Fee
(Geofence Policy
Violations)
Fee
Fee charged to Micro-Mobility vendors for
each device discarded in the Public Right of
Way and impounded by the Department of
Public Works.
$100/Device
Impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Discarded device in public
ROW)
Fee
Fee charged to Micro-Mobility vendors for
each Micro Mobility device found re-balanced
outside of designated vendor parking zone or
exceeding designated parking zone capacity.
$100/device
impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device outside of
designated vendor parking
zone or exceeding
designated parking zone
capacity)
Fee

Page 22 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
Micro Mobility Permits
Fee charged to Micro-Mobility vendors for
each Micro Mobility Device found
noncompliant with ADA requirements and
situation not remedied within 2 hours.
$100/Device
Impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device noncompliant with
ADA requirements)
Fee
Fee charged to Micro-Mobility vendors for
each Micro Mobility Device left unattended for
more than 24 hours (unless within the limits of
a parking zone).
$100/Device
impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device left unattended for
more than 24 hours)
Fee
Fee charged to Micro-Mobility vendors for
each Micro Mobility Device that fails to meet
the minimum equipment requirements in
Micro-Mobility Permit Section 3.4.1. and/or
requirements set forth by CVC 21201.
$100/device
impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device fails to meet the
minimum equipment
requirements)
Fee
Fee charged to Micro-Mobility vendors for
each damaged Micro Mobility device available
for public use or left in the public right-of-way.
$100/device
impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Damaged Device
available for public use or
left in the public
right-of-way)
Fee
Fee charged to Micro-Mobility vendors for
each Micro Mobility Device not removed as
requested for special event or emergency as
per CVC 312.5.2.
$100/Device
impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device not removed as
requested)
Fee
Fee charged to Micro-Mobility vendors if the
Micro Mobility Device quantity exceeds
vendor’s maximum allowed Citywide capacity.
$100/device
impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device quantity exceeds
vendor’s maximum
allowed Citywide capacity)
Fee
Fee charged to Micro-Mobility vendors for
each Micro Mobility Device that exceeds the
maximum speed set forth by CVC 22411
(e-scooters: 15 MPH) and (e-bikes: 20 MPH).
$100/device
impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device speed exceeds
maximum)
Fee
Fee charged to vendors for each Micro
Mobility Device deployed by non-permitted
vendor.
$100/device
Impounded
Per DeviceMicro-Mobility
Non-Compliance Fee
(Device deployed by
non-permitted vendor)
Fee
Fee charged to Micro-Mobility permittee when
there is failure to provide data through Mobility
Data Specification (MDS).
$1,000/day
with violation
Per Day with
Violation
Micro-Mobility
Non-Compliance Fee
(Data Sharing)
Fee

PARKING CITATIONS
LBMC 10.28.060 - Occupying a metered
parking space without paying for parking
$69 CitationExpired Meter Fee
LBMC 10.30.080 - Prohibition against parking
overnight in designated lots
$69 CitationOvernight Parking in
Beach Lots
Fee
VC 21211 (B) - No parking in a bicycle lane $69 CitationParking in Bicycle Lane Fee

Page 23 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
LBMC10.24.081. This ban applies to vehicles
that are either 85 inches high, 80 inches wide
or 22 feet long. The most common of these
vehicles are RVs. Residents will be able to
acquire a free printable 72-hour parking permit
from the city's website if they need to park
their oversized vehicles on residential streets.
$70 CitationOversized Vehicle Parking
Citation
Penalty
LBMC 8.76.010G - Illegal Parking Private
Property
$65 CitationIllegal Park/Private
Property
Penalty
LBMC 8.76.010Q - Parking Near Empty
Building
$65 CitationParking Near Empty
Building
Penalty
LBMC 8.76.010R - Parking on Empty Lot $65 CitationParking on Empty Lot Penalty LBMC 8.76.010T - Commercial Vehicle on
Private Property
$65 CitationCommercial Vehicle on
Private Property
Penalty
LBMC10.22.020 - Parkways and Sidewalks $69 CitationParking on Parkway/Sidewalk
Penalty
LBMC10.22.070 - Blocking Wheels on Hills $65 CitationImproper Parking Penalty LBMC10.22.080 - Parking Vehicles for Sale $69 CitationVehicle for Sale Penalty LBMC10.22.090 - Food Vendor Parking $65 CitationNo Parking Peddlers Penalty LBMC10.22.110 - Fire Lanes $105 CitationParking in Fire Lane Penalty LBMC10.22.120 - Temporary Parking
Restrictions
$69 CitationNo Parking Temporary Penalty
LBMC10.22.130 - Seventy-Two Hour Parking
Limit
$69 CitationParked over 72 hours Penalty
Fee for vehicles not removed from curbside
during posted street sweeping hours; parked
vehicles prohibit a thorough sweep.
$70 CitationStreet Sweeping Penalty
LBMC10.22.150 - Repairing Vehicles on
Streets
$65 CitationStreet Repair of Vehicle Penalty
LBMC10.22.160 - Parking on Private Property $65 CitationPrivate Property/ Penalty LBMC10.22.182 -Parking Regulations within
Public Housing Projects
$65 CitationParking - Public Housing Penalty
LBMC10.24.010 - Angle Parking $65 CitationParking Within Lines Penalty LBMC10.24.030 -Parking Prohibited Where
Posted--Exception
$85 CitationNo Stopping Penalty
LBMC10.24.050 - Parking Prohibited -
Compliance Required
$69 CitationNo Parking Penalty
LBMC10.24.090 - Limited Time Parking $69 CitationExceeded Time Limit Penalty LBMC10.24.130 - Parking Space Markings $65 CitationParking Within T's Penalty LBMC10.26.010 - Yellow, White, Green Curb
Markings
$69 CitationYellow, White, Green Curb Penalty
LBMC10.26.020 - Red Curb Markings $69 CitationRed Curb Other Penalty

Page 24 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
LBMC10.26.030 - Stopping in Alley $85 CitationParking in an Alley Penalty LBMC10.34.020 - Parking For Disabled
Persons Reserved For Vehicles With
Appropriate License Plates or Placards
$360 CitationDisabled Parking - Streets
and Public Lots
Penalty
LBMC10.38.110 - Commercial Vehicle Parking
On Residential Streets Designated As Truck
Routes
$85 CitationTruck over 2 Hours Penalty
LBMC10.40.010 - Establishment of
Designated Truck Routes
$130 CitationCommercial vehicle over
6,000 lbs unladen weight
parked off truck route.

Pick-ups exempt
Penalty
VC21113.A - Driving Or Parking On Public
Grounds
$69 CitationNo Parking on City
Property
Penalty
VC22500.A - Prohibited Stopping, Standing, or
Parking
$69 CitationParking in Intersection Penalty
VC22500.B - Prohibited Stopping, Standing, or
Parking
$69 CitationParking on Crosswalk Penalty
VC22500.C - Prohibited Stopping, Standing, or
Parking
$69 CitationRed Curb Safety Zone Penalty
VC22500.D - Prohibited Stopping, Standing, or
Parking
$69 CitationRed Curb Fire Station Penalty
VC22500.E - Prohibited Stopping, Standing, or
Parking
$80 CitationParking across Driveway Penalty
VC22500.F - Prohibited Stopping, Standing, or
Parking
$69 CitationParking on Sidewalk Penalty
VC22500.G - Prohibited Stopping, Standing,
or Parking
$69 CitationObstructing Traffic at
Excavation
Penalty
VC22500.H - Prohibited Stopping, Standing, or
Parking
$85 CitationDouble Parking Penalty
VC22500.I - Prohibited Stopping, Standing, or
Parking
$285 CitationRed Curb Bus Zone Penalty
VC22500.J - Prohibited Stopping, Standing, or
Parking
$69 CitationParking in Tunnel Penalty
VC22500.K - Prohibited Stopping, Standing, or
Parking
$69 CitationParking on Bridge Penalty
VC22500.L Parking in front of or on curb cut
down for wheelchair access
$310 CitationParking Near Access
Ramp for Physically
Handicapped
Penalty
VC22502.A - Curb Parking $65 CitationParking 18" of Curb Penalty VC22507.8 - Parking In Spaces For The
Disabled
$360 CitationDisabled Person Off Street Penalty
VC22514 - Fire Hydrants $69 CitationRed Curb Fire Hydrant Penalty VC22515 - Unattended Vehicles $65 CitationUnattended Vehicle Penalty VC22516 - Locked Vehicles $69 CitationLocked Vehicle with Occupant
Penalty

Page 25 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
VC22520 - Vending On Or Near Freeways $69 CitationParking on Freeway Penalty VC22521 - Parking Upon Or Near Railroad
Track
$69 CitationParking Upon Or Near
Railroad Track
Penalty
VC5204 (A) - Registration Tabs $65 CitationNo Current Reg. Tag Penalty A 100% penalty not to exceed $55 will be
assessed to an unpaid parking citation after 21
days from the mailing date of the Notice of
Parking Violation.

A 100%
penalty not to
exceed $55
will be
assessed to
an unpaid
parking
citation after
21 days from
the mailing
date of the
Notice of
Parking
Violation.

CitationFirst Late Payment Penalty Penalty
25% CitationCollection Agency Charge Penalty
A collection charge will be assessed to an
unpaid parking citation after a hold on the
vehicle registration renewal is placed with the
DMV.

3.30 CitationDepartment of Motor
Vehicle (DMV) Collection
Charge
Penalty
A 25% penalty will be assessed to an unpaid
parking citation after 21 days from the mailing
date of the Notice of Parking Violation - Final
Notice. This penalty will be applied after the
First Late Payment Penalty and the
Department of Motor Vehicles (DMV)
Collection Charge is assessed and then it is
rounded to the next whole dollar.
25% Delinquent
Balance
Second Late Payment
Penalty
Penalty

2.30 CitationCopy of Parking Violation Penalty

STREETLIGHTS
Street lighting (LS-1) on existing SCE utility
poles. 70 Watts based on HPS equivalent and
all night service.
1,955.00 FixtureLight Fixture - Alley LED
(70 Watt)
Fee
Street lighting (LS-1) on existing SCE utility
poles. 100 Watts based on HPS equivalent
and all night service.
$2043.00 FixtureLight Fixture - Residential
Street LED (100 Watt)
Fee
Street lighting (LS-1) on existing SCE utility
poles. 150 Watts based on HPS equivalent
and all night service.
$2,196.00 FixtureLight Fixture - Collector
Street LED (150 Watt)
Fee
Street lighting (LS-1) on existing SCE utility
poles. 200 Watts based on HPS equivalent
and all night service.
$2,347.00 FixtureLight Fixture - Major 1
Street LED (200 Watt)
Fee

Page 26 of 27 ends

MASTER FEES AND CHARGES SCHEDULE
DEPARTMENT: PUBLIC WORKS
PerFeeDescriptionFee Name Type
Street lighting (LS-1) on existing SCE utility
poles. 250 Watts based on HPS equivalent
and all night service.
2,677.00 FixtureLight Fixture - Major 2
Street LED (250 Watt)
Fee
Street lighting (LS-1) on existing SCE utility
poles. 400 Watts based on HPS equivalent
and all night service.
$2,971.00 FixtureLight Fixture - Highway
LED (400 Watt)
Fee
Repair of a damaged streetlight pole due to
the actions of a third party.

Charge the
fully allocated
hourly rates for
all personnel
used plus any
outside costs.

IncidentStreetlight Pole Damage
Repair
Fee

Page 27 of 27 ends
← All documents from this meeting