July 11, 2023
HONORABLE MAYOR AND CITY COUNCIL
City of Long Beach
California
RECOMMENDATION:
Adopt Plans and Specifications No. R-7211 and R-7212 and award a contract to Griffith Company, of Santa Fe Springs, CA, for the Taxilane K Reconstruction and Construct Taxilane U Projects at the Long Beach Airport, in the amount of $7,272,317 with a 15 percent contingency in the amount of $ 1,090,848, for a total contract amount not to exceed $ 8,363,165; and, authorize the City Manager, or designee, to execute all documents necessary to enter into the contract, including any necessary subsequent amendments;
Adopt Categorical Exemption CE-23-055; and,
Increase appropriations in the Airport Fund Group in the Airport Department by $9,574,430 offset by grant revenue and Airport funds available. (Districts 4, 5)
DISCUSSION
City Council approval is requested to enter into a contract with Griffith Company (Griffith) for the Taxilane K Reconstruction and Construct Taxilane U Projects at the Long Beach Airport (Airport).
The Taxilane K Reconstruction project includes the recons truction of approximately 71,500 square feet (sf.) of pavement and the rehabilitation of approximately 67,650 sq. ft. of pavement.
Taxilane K provides airfield access to tenants in the northeast quadrant of the airfield along the Lakewood Boulevard corrid or, including multiple hangars at the south end of Taxilane K. A significant portion of the Taxilane K pavement is in poor condition and has reached the end of its useful life. The Taxilane K project includes improvements to the pavement, pavement markings, striping, and drainage systems.
The Construct Taxilane U Project repurposes an area that includes portions of decommissioned Runway 16R -34L south of Taxiway F to provide improved access to the airfield. Approximately 42,900 sq. ft. of pavement will b e constructed, including pavement markings, lighting, signage, and drainage systems. Taxilane U will provide access to Taxiway F for general aviation tenants adjacent to the Spring Street vehicle gate.
The bid was advertised in the Long Beach Press -Telegram on February 24, 2023, and 79 potential bidders specializing in airfield pavement and construction related services were notified of the bid opportunity. Of those bidders, 26 downloaded the bid via the City's electronic bid system. The bid docume nt was made available from the Purchasing Division, located on Long Beach Airport
4100 E. Donald Douglas Drive, Floor 2, Long Beach, CA 90808 (562) 570-2619
R-40
HONORABLE MAYOR AND CITY COUNCIL
July 11, 2023
the sixth floor of City Hall, and the Division’s website at www.longbeach.gov/purchasing. A bid announcement was also included in the Purchasing Division’s weekly update of Open Bid Opportunities, which is sent to 44 local, minority-owned, and women-owned business groups.
There were four bids received on March 27, 2023. Of those four bidders, none were Minority- owned Business Enterprises (MBEs), Women -owned Business Enterprises (WBEs), Disadvantaged Business Enterprises (DBEs), certified Small Business Enterprises (SBEs), or Long Beach businesses (Local). Griffith Company, of Santa Fe Springs, CA, (not a MBE, WBE, SBE, or Local) was the lowest responsible bidder.
Mobilization is anticipated for September 2023, and construction completion is anticipated in August 2024. The construction Plans and Specifications contain phasing requirements to maintain sufficient access for all Airport passengers and operators, including commercial airlines and general aviation tenants.
Local Business Outreach
To align with the City’s outreach goal, Long Beach businesses are encouraged to submit bids for City contracts. The Purchasing Division also assists businesses with registering on the Long Beach Buys database to download the bid specifications . Through outreach, five Long Beach vendors were notified to submit bids, of which four downloaded, and none submitted a bid. The Purchasing Division is committed to continuing to perform outreach to local vendors to expand the bidder pool.
In an effort to notify DBEs, in addition to regular practices, an additional bid announcement was made and 1,542 DBEs specializing in construction -related services were also notified of this bid opportunity.
In accordance with the California Environmental Quality Act (CEQA), Categorical Exemption CE-23-055 was issued for this project (Attachment). The project received a Categorical Exclusion pursuant to Federal Aviation Administration (FAA) Order 1050.1F, and in accordance with the National Environmental Policy Act on February 22, 2023.
This matter was reviewed by Principal Deputy City Attorney Richard F. Anth ony on May 22, 2023, Purchasing Agent Michelle Wilson on May 19, 2023, and by Budget Analysis Officer Greg Sorensen on May 25, 2023.
SUSTAINABILITY
The project specifications will allow the contractor to use a percentage of asphalt millings from the demolition of the existing pavement to be recycled into the new pavement section . This will significantly reduce the number of truck trips required to co nstruct the new pavement section and the amount of new aggregate material that needs to be produced. The new Taxilane K and Taxilane U pavement will have an anticipated service life of 20 years.
HONORABLE MAYOR AND CITY COUNCIL
July 11, 2023
TIMING CONSIDERATIONS
City Council action to adopt Plans and Specifications No. R-7211 and R-7212 and award a contract concurrently is requested on July 11 , 2023, to ensure the contract is executed expeditiously.
FISCAL IMPACT
The total construction contract amount will not exceed $ 8,363,165, inclusive of a 15 percent contingency for unforeseen circumstances. The total project cost, including the construction contract award is estimated at $11,690,012, which includes design, construction management, inspection services, material testing, labor compliance, DBE administration, and related project support.
On May 17, 2022, the City Council authorized an appropriation increase of $695,166 for the project's design phase. On February 14, 2023, the City Council authorized an appropriation increase in the amount of $1,420,416 for the construction management and material testing services for the project. An appropriation increase in the amount of $9,574,430 is requested in the Airport Fund Group in the Airport Department for the remaining project cost , offset by reimbursement grant revenue and available Airport funds.
On May 9, 2023, the City Council authorized the acceptance of the FAA Airport Improvement Program (AIP) Grant for Fiscal Year 202 3 in an amount not to exceed $ 8,836,388 based on the construction bid amount . The FAA awarded the Airport the grant for the project on June 15, 2023, in the amount of $ 8,008,082. The grant requires matching funds in the amount of $825,011. The matching funds and amounts not covered by the grant will be funded by Airport funds available.
This recommendation has no staffing impact beyond the normal budgeted scope of duties and is consistent with existing City Council priorities. The award of this contract will provide continued support to our local economy by assisting in the preservation of employment for 15 full-time employees residing in Long Beach.
SUGGESTED ACTION
Approve recommendation.
Respectfully submitted,
CYNTHIA GUIDRY
DIRECTOR, LONG BEACH AIRPORT
ATTACHMENT
APPROVED:
THOMAS B. MODICA
CITY MANAGER
TO: Office of Planning & Research FROM: Department of Development Services 1400 Tenth Street, Room 121
Sacramento, CA 95814
W. Ocean Blvd, UG Floor
Long Beach, CA 90802
L.A. County Clerk
Environmental Fillings
12400 E. Imperial Hwy., Room 1201
Norwalk, CA 90650
Exemption Number: __________________
Project Title (Application Number): _________________________________________________________ Project Location – Specific: _______________________________________________________________ Project Location – City/County: City of Long Beach, Los Angeles County, California Description of Nature, Purpose and Beneficiaries of Project:
Public Agency Approving Project: City of Long Beach, California Person or Agency Carrying Out Project:
Exempt Status: (Check One)
Ministerial (Sec 21080(b)(1); 15268);
Declared Emergency (Sec 21080(b)(3); 15269(a));
Emergency Project (Sec 21080(b)(4); 15269(b)(c));
Categorical Exemption. State type and section number:
Statutory Exemption. State code number:
Reasons why project is exempt:
Lead Agency
Contact Person: _____________________________________ Contact Phone: _____________________ Signature: ______________________________ Date:______________ Title: ________________________ &(4$1RWLFHRI([HPSWLRQ
Development Services
3ODQQLQJ%XUHDX
:HVW2FHDQ%RXOHYDUGQG)ORRU/RQJ%HDFK&$
________________________________________________________________________ ______________________________________________________________ _____________________ ____________________________________________________________________________________ ____ CE-23-055
Long Beach Airport Reconstruct Taxilane K and Construct Taxilane U Project 4100 Donald Douglas Drive (Long Beach Airport Airfield - Taxilane K and former Runway 16R-34L south of Taxiway F) The proposed action would involve the rehabilitation and reconstruction of 91,150 square feet (2.09 acres) of Taxilane K and the construction of a 74,100 square feet (1.7 acres) of pavement including shoulders, and the conversion of former Runway 16R-34L south of Taxiway F to Taxilane U. Taxilanes K and U would provide airfield access for aviation crafts accessing the on-airfield hangars.
Taxilane K currently provides airfield access to tenants in the northeast quadrant of the airfield along the Lakewood Boulevard corridor, including multiple hangers at the south end of Taxilane K. Similarly, Taxilane U would provide access to hangars at the southern portion of the airfield. The Taxilane U scope of work will be repurposing an area that includes portions of decommissioned Runway 16R-34L, south of Taxiway F, to provide improved access to Taxiway F for general aviation tenants adjacent to the Spring Street Vehicle Gate. The Taxilane K scope of work is pavement replacement/reconstruction in the same location. A significant portion of the Taxilanes’ pavement is in poor condition and has reached the end of its useful life. The projects will include improvements to pavement, pavement markings, striping, and drainage systems. These improvements will preserve airfield safety and capacity for our general aviation partners.
Long Beach Airport, Hugo Liu
15301, 15302, and 15303
This project is for the repair, reconstruction, resurfacing, regrading, paving, and realignment of existing paved and disturbed areas used for airc raft/vehicle access and parking areas for on-airfield operations. The conversion of the decommissioned runway to Taxilane U is new construction that would addres s safety and airport design issues that exist under the current configuration of paved areas. The Taxilane U project area is presently used for aircraft access and parking to existing airfield hangars. The replacement/reconstruction of Taxilane K pavement is a maintenance activity and would not represent a change from existing conditions. The proposed physical improvements will be made within the disturbed footprint of the former Runway 16R ͈34L and existing paved taxilanes. The project would not not result in changes to operations, runway use, or flight patterns at the airport that would represen ta n expansion of the existing airport use. There would be no additional hangar areas constructed as part of this project.
Maryanne Cronin 562-570-5683
5/3/23 Planner