Terminal Roadway Improvements
July 18, 2023

• Phase I
✓ Parking Structure B – Nov. 2011
✓ Passenger Concourse & Security
Screening Checkpoint – Dec. 2012
• Phase II
✓ Ticketing & Consolidated Baggage
Screening Facilities – May 2022
✓ Baggage Claim Facility – Apr. 2023
o Historic Terminal Renovation &
Relocation of Rental Car Counters
o Airport Plaza Improvements
Terminal Area Improvement Program (TAIP)
2 Terminal Roadway Project
–
Overview
• Focuses on terminal area vehicular
and pedestrian improvements
• Enhances the passenger experience
from curb to gate
• Funded by a $10.6M federal grant;
FAA Bipartisan Infrastructure Law –
Airport Terminals Program
• Awarded to only four airports in CA for
Fiscal Year (FY) 2022
• Originally designed as part of Phase II;
placed on hold in FY 2020 due to
budget constraints
3 Terminal Roadway Project
–
Scope
Donald Douglas Drive & Barbara London Drive pavement rehabilitation Lakewood Blvd.

Parking Structure B
Donald Douglas Dr.

Parking
Structure A
Terminal
Barbara London Dr.
4 Terminal Roadway
Project
–
Scope
• Enhances the Passenger
Drop-off & Pick-up area
• Increases throughput capacity at
Barbara London Dr.
• Relocates the Gulfstream
leasehold primary entrance
to mitigate traffic congestion
5 Terminal Roadway Project
–
Existing Conditions
Curved roadway – Single crosswalk – Irregular-sized pedestrian island – Limited ADA curb access 6 Terminal Roadway Project
–
Modifications
A. Straightened roadway & curb B. Expanded sidewalk C. Extended pedestrian island D. Designated ADA ramps E. Six traffic lanesF. Two raised crosswalks A.

B.

C.

D
.

E.

F.
7 Terminal Roadway Project
–
Wayfinding & Signage
Vehicle and Pedestrian Wayfinding
Passenger Pick-up
Location Signs
ADA and Dial-A-Lift
Location Signs
8 Terminal Roadway Project
–
Wayfinding & Signage
Passenger Pick-up & ADA Vehicle & Pedestrian 9 Terminal Roadway Project
–
Next Steps
• City Council approval:
o Award of Construction Contract
o Award of Construction Management Contract
• Project Mobilization: Oct. – Dec. 2023
• Project Construction: Jan. – Sep. 2024
10 11