1 EWM:ag A23-02379 (08/24/2023)
\\clbctyattorney\cycom$\ctylaw32\wpdocs\d001\p053\01567969.docx 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

OFFICE OF THE CITY ATTORNEY
DAWN MCINTOSH, City Attorney
411 West Ocean Boulevard, 11th Floor
Long Beach, CA 90802-4664
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF LONG BEACH FINDING THAT THE MARKETPLACE
PROJECT AT 6615-6695 EAST PACIFIC COAST HIGHWAY

IS CONSISTENT WIT H AND WITHIN THE SCOPE OF THE

SOUTHEAST AREA SPECIFIC PLAN PROGRAM

ENVIRONMENTAL IMPACT REPORT AND SUBJECT TO

THE SOUTHEAST AREA SPECIFIC PLAN MITIGATION
MONITORING AND REPORTING PROGRAM; AND MAKING

CERTAIN FINDINGS AND DETERMINATIONS RELATED

THERETO
WHEREAS, on June 1, 2017, the Planning Commission conducted a public hearing on the Southeast Area Specific Plan (SEASP) and formally recommended the Specific Plan to the City Council for adoption. The purpose of the SEASP was to enhance the quality of life, improve the functionality and visual appearance of public and private improvements in the area, and provide an overall framework for resource protection, mobility, growth, and development for the southeast area of the City into the future; and WHEREAS, on September 19, 2017, the City Council of the City of Long Beach adopted certain provisions of the Long Beach Zoning Regulations, Title 21 of the Long Beach Municipal Code, relating to establishing the SEASP consisting of 1,472 acres and including 1,372 acres currently zoned PD-1, 94 acres of the San Gabriel River and Los Cerritos Channel, and six (6) acres along the southeast edge of the current PD-1 boundary. The SEASP replaced the Southeast Area Development and Improvement Plan (SEADIP). A new Specific Plan was required to bring regulations in the southeast part of the City into conformity with the new vision for the area, to comply with State requirements for more compact mixed-use development, and to provide a range of RES-23-0142

2 EWM:ag A23-02379 (08/24/2023)
\\clbctyattorney\cycom$\ctylaw32\wpdocs\d001\p053\01567969.docx 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

OFFICE OF THE CITY ATTORNEY
DAWN MCINTOSH, City Attorney
411 West Ocean Boulevard, 11th Floor
Long Beach, CA 90802-4664

mobility options the public had expressed a desire for and which were mandated under the City’s Mobility Element, as well as State law; and
WHEREAS, in connection with adoption of the SEASP, the City, as lead agency, prepared a Program Environmental Impact Report (PEIR) for the SEASP (State Clearinghouse No. 2015101075) (SEASP PEIR) in accordance with the provisions of the California Environmental Quality Act (CEQA) and Section 15168 of the CEQA Guidelines, which provides for the preparation of a PEIR “[i]n connection with issuance of rules, regulations, plans, or other general criteria to govern the conduct of a continuing program.” The City Council certified the SEASP PEIR in September 2017 when it adopted the SEASP; copies of which SEASP PEIR, are accessible at the links included in Exhibit “A” attached hereto and incorporated herein by this reference as though set forth in full, word for word;
WHEREAS, on October 8, 2020, the California Coastal Commission (CCC) held a hearing for the Local Coastal Program Amendment (LCPA No. 1-19 [LCP-5-LOB- 19-0008-1]) related to the City Council’s adoption of SEASP and CCC recommended certification of the Local Coastal Program Amendment with required modifications; WHEREAS, on July 13, 2021, the City Council of the City of Long Beach adopted the modifications proposed by the CCC, determined that the changes to the SEASP from the CCC were not significant and were within the scope of the SEASP PEIR and recertified the SEASP PEIR;
WHEREAS, where appropriate, the mitigation measures to the SEASP PEIR require preparation of specific additional studies and analyses to determine whether an individual project would result in project-specific new or increased significant effects that are peculiar to the project or its site;
WHEREAS, the proposed Marketplace Project (Project) located at 6615, 6621, and 6695 East Pacific Coast Highway in the City of Long Beach is an L-shaped site comprised of three (3) parcels located at the northeast corner of the intersection of Pacific Coast Highway and Studebaker Road in the southeast portion of the City of Long

3 EWM:ag A23-02379 (08/24/2023)
\\clbctyattorney\cycom$\ctylaw32\wpdocs\d001\p053\01567969.docx 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

OFFICE OF THE CITY ATTORNEY
DAWN MCINTOSH, City Attorney
411 West Ocean Boulevard, 11th Floor
Long Beach, CA 90802-4664

Beach. The project would consist of the demolition of two (2) existing office buildings on the site, and the construction of a new six-story mixed-use project consisting of 390 residential dwelling units (seventeen (17) of which are affordable units at the very low income level), 5,531 square feet of commercial/retail space in a building with 576 vehicular parking spaces, 196 bicycle parking spaces, and 45,141 square feet of public and private open space area within the Mixed-Use Community Core designation of the SEASP. The Project site is within the boundaries of the SEASP, and, as set forth below, is consistent with the SEASP;
WHEREAS, the California Density Bonus Law (California Government Code Section 65915 et seq.) allows developers to seek increases in base density in exchange for providing affordable housing units on site. To help make constructing on- site affordable units feasible, the law allows developers to seek incentives, concessions and waivers to ensure the project could be built without significant burden and without detriment to public health;
WHEREAS, this Project proposes seventeen (17) very-low income affordable units which qualifies the Project for a twenty (20) percent increase in the number of market rate units within the project. The seventeen (17) affordable units will be provided at the very-low-income level, restricted as affordable through a covenant for a minimum of 55 years, as required by the California State Density Bonus Law. Based on the percentage of affordable units proposed by the Project, the California Density Bonus Law permits one incentive or concession, in addition to any necessary waivers, reductions or modifications to development standards and other regulations where those requirements could make the construction of the proposed Project with the contemplated incentive physically infeasible if not approved. The Density Bonus incentive requested for this Project relates to building massing and would allow the proposed Project to include one building in lieu of multiple buildings encouraged by the SEASP. The requested four (4) waivers relate to the massing incentive and include: (1) building height (maximum height of 91-feet 81/2 inches to allow for the sixth floor and rooftop amenities); (2)

4 EWM:ag A23-02379 (08/24/2023)
\\clbctyattorney\cycom$\ctylaw32\wpdocs\d001\p053\01567969.docx 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

OFFICE OF THE CITY ATTORNEY
DAWN MCINTOSH, City Attorney
411 West Ocean Boulevard, 11th Floor
Long Beach, CA 90802-4664

building stories (exceed the building height requirements along Pacific Coast Highway which is limited to five (5) stories) and Shopkeeper Road (which is limited to three (3) stories for the first 30 feet); (3) Building story requirements along Shopkeeper Road Fronting Wetlands (allow six (6) stories within the 30 feet adjacent to Shopkeeper Road fronting the wetlands whereas the SEASP limits heights to three (3) stories at the first 30 feet); and (4) a variety of height allowances to allow the project to include buildings at maximum heights;
WHEREAS, on July 20, 2023, the Long Beach Planning Commission took the following actions: determined that the Project is within the scope of and consistent with the previously certified SEASP PEIR and approved the Compliance Checklist (PECC 03-23) evidencing consistency with the SEASP PEIR; approved the Site Plan Review application (SPR22-082); approved the Lot Line Adjustment (LLA22-002); approve a lot merger request (LMG22-012); and approve a Local Coastal Development Permit (LCDP22-049) for all discretionary and subdivision actions required for the proposed Project;
WHEREAS, within the 10-day post-hearing appeal period, (1) Lozeau Drury LLP, on behalf of Supporters Alliance for Environmental Responsibility (SAFER) (APL12- 011); (2) Elizabeth Lambe on behalf of the Los Cerritos Wetlands Land Trust (LCWLT) (APL23-012); and (3) Ann Cantrell and Anna Christensen on behalf of the Sierra Club Los Cerritos Wetlands Task Force (APL23-014), filed appeals of the Planning Commission’s action, copies of which appeals were appended to the staff report provided to the City Council for its review and consideration;
WHEREAS, the Planning Bureau of the Department of Development Services has undertaken review of the Project in accordance with CEQA Guidelines Section 15183 through the use of the Compliance Checklist (PECC 03-23) attached to the staff report as Attachment K, and incorporated herein by this reference as though set forth in full, word for word The Compliance Checklist (PECC 03-23) has been provided to the City Council for its evaluation and consideration to determine whether there are

5 EWM:ag A23-02379 (08/24/2023)
\\clbctyattorney\cycom$\ctylaw32\wpdocs\d001\p053\01567969.docx 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

OFFICE OF THE CITY ATTORNEY
DAWN MCINTOSH, City Attorney
411 West Ocean Boulevard, 11th Floor
Long Beach, CA 90802-4664

project-specific significant effects which are peculiar to the Project or the project site that would require still further environmental analysis; and WHEREAS, pursuant to CEQA, the City serves as the “lead agency” with respect to the Project in connection with the subject City actions.

NOW, THEREFORE, the City Council resolves as follows:

Section 1. The City Council: (a) has considered the SEASP PEIR analysis as prepared by City staff, and other pertinent evidence in the record, including the Compliance Checklist (PECC 03-23) studies, reports, and other information from qualified experts (collectively the “Environmental Documents”), (b) has considered the environmental effects of the Project as set forth in the Environmental Documents, and (c) makes the following findings:

A) The City independently reviewed and analyzed the Environmental Documents and finds that they reflect the independent judgment of the City.

B) The SEASP was adopted as a zoning ordinance and is consistent with the City’s General Plan.

C) The City previously certified the SEASP PEIR for the SEASP.

D) The Project is consistent with the provisions and requirements of the SEASP.

E) All applicable feasible mitigation measures from the SEASP PEIR will be imposed on and be undertaken as part of the Project, in the form of mitigation measures, regulatory compliance measures, project design features, and/or conditions of approval, as set forth in the Environmental Documents in addition to mitigation by the imposition of uniformly applied development policies or regulatory standards appliable to the project.

F) Based on substantial evidence in the Environmental Documents and elsewhere in the record, including but not to limited to oral and written testimony provided at the public hearings on the matter, there are no environmental effects of the Project that: (1) are project-specific impacts

6 EWM:ag A23-02379 (08/24/2023)
\\clbctyattorney\cycom$\ctylaw32\wpdocs\d001\p053\01567969.docx 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

OFFICE OF THE CITY ATTORNEY
DAWN MCINTOSH, City Attorney
411 West Ocean Boulevard, 11th Floor
Long Beach, CA 90802-4664

peculiar to the Project or its site; (2) were not analyzed as significant effects in the SEASP PEIR; (3) are potentially significant off-site impacts and cumulative impacts which were not discussed in the SEASP PEIR; or (4) are previously identified significant effects which, as a result of substantial new information which was not known at the time the SEASP PEIR was certified, are determined to have a more severe adverse impact than discussed in the SEASP PEIR.

G) Pursuant to CEQA Guidelines 15183, no further CEQA review or additional environmental studies are required for the Project.

H) None of the information submitted by the Appellants, including the Appeals and testimony by the Appellants and their representatives at the public hearings on the Project, constitutes significant new information. The City Council has carefully considered the information and testimony provided at the public hearing and does not find it to be credible evidence of a significant new environmental impact, a substantial increase in the severity of an impact previously disclosed in the SEASP PEIR, or otherwise requiring additional CEQA review, including but not limited to the preparation of a subsequent or supplemental EIR pursuant to CEQA Guidelines 15162 and 15163;
I) The City Council finds and declares that substantial evidence for every finding made herein is contained in the Environmental Documents, which are incorporated herein by this reference, and is in the record of proceedings in the matter.

J) Consistent with Public Resources Code Section 21081.6, the City Council adopts and imposes the Mitigation Monitoring and Reporting Program attached hereto as Exhibit “B”, which is incorporated herein by this reference, to mitigate or avoid significant effects of the Project on the environment and to ensure compliance during project implementation.

7 EWM:ag A23-02379 (08/24/2023)
\\clbctyattorney\cycom$\ctylaw32\wpdocs\d001\p053\01567969.docx 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

OFFICE OF THE CITY ATTORNEY
DAWN MCINTOSH, City Attorney
411 West Ocean Boulevard, 11th Floor
Long Beach, CA 90802-4664

K) In accordance with the requirements of Public Resources Section 21081.6, the City Council hereby adopts each of the mitigation measures expressly set forth herein as conditions of approval for the Project.

L) Consistent with Public Resources Code Section 21081.6(a)(2), the documents that constitute the record of proceedings for approving the Project are located at the Development Services Department, 411 East Ocean Blvd., 3rd Floor, Long Beach, California 90802.

Section 2. After due consideration and receipt of all appropriate evidence, both written and oral, the City Council hereby denies the appeals of Lozeau Drury LLP, on behalf of SAFER, Elizabeth Lambe on behalf of LCWLT, and Ann Cantrell and Anna Christensen on behalf of Sierra Club Los Cerritos Wetlands Task Force and approves the Project, as conditioned and mitigated, and as described in the supporting documentation, which documentation is incorporated herein by reference as though set forth herein, word for word.

Section 3. This resolution shall take effect immediately upon its adoption by the City Council, and the City Clerk shall certify the vote adopting this resolution. ///
///
///
///
///
///
///
///
///
///
///
0 Cu >, .Q
z ~ lJ.. 'SI"
Ct'. '- ..c co
oiE;=~
i- <e ~-N
I- >, --0 0
<( ::: ro a)
i:=U >o - Q) 0)
- I :5 <(
Ucn O()
w O co
II- c.c 1-zroo
lJ.. 0 ~ ~
o~oco
Wz-o
5:2:s;:~§
U..<($-'
~o~
'SI"
1 I hereby certify that the foregoing resolution was adopted by the City 2 Council of the City of Long Beach at its meeting of __ S_e-'-p_te_m_b_e_r_1_9 __ , 2023, by the 3 following vote:
4 5 Ayes: Councilmembers: Allen, Duggan, Supernaw, Kerr, Saro, 6 Uranga, Austin, Ricks-Oddie.
7 8
9 Noes: Councilmembers: None.
10 11 Absent Councilmembers: Zendejas.
12 13 Recusal(s): Councilmembers: None.
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 8
EVVM:ag A23-02379 (08/24/2023)
\ \clbctyattorney\cycom$1ctylaw32\wpdocs\d00 1lp053\01567969 .docx

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075
Resolution to Certify the Program Environmental Impact Report (PEIR), including Findings of Fact, Statement of Overriding Considerations, and Mitigation Monitoring and Reporting Program.

Resolution No. RES-17-0101:
https://longbeach.legistar.com/View.ashx?M=F&ID=5541058&GUID=22E2E145- CDC2-40E5-9A04-1512B04D4BA3
Draft and Final PEIR and Technical Analyses:
https://www.longbeach.gov/lbds/planning/environmental/reports/ SEASP 2060 Document (Superseded by RES-21-0078):
https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan- seasp/seasp_r4_web_9-7-17
SEASP Mitigation Monitoring and Reporting Program:
https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/exhibit-d- seasp-mmrp_final_ri-alt
SEASP Final EIR:
https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/exhibit- d_seasp-feir
App A1 Agency and Org Comments on DEIR:
https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- a1_agency-and-org-comments-on-deir

EXHIBIT A
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 2 of 13 ends

App A2 Resident Comments on DEIR:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- a2_resident-comments-on-deir

App A3 Late Letters on DEIR:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app-a3_late- letters-on-deir

App B1 Agency and Org Comments on Traffic Section:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- b1_agency--org-comments-on-traffic-section-reduced

App B2 Resident Comments on Traffic Section:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- b2_resident-comments-on-traffic-section

App B3 Seiff K Attachment Photos:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- b3_seiff_k_attachment_photos

App C1 WRA Memo on Bird Safe:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app-c1_wra- memo-on-bird-safe

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 3 of 13 ends

App C2 WRA SEASP DEIR RTC Memo:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app-c2_wra- seasp-deir-rtc-memo

App D1 Intersection 10:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- d1_intersection-10

App D2 New Intersections Freeway Figures:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app-d2_new- intersections_freeways_figures

App D3 Public Records Request Memo:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- d3_public-records-request-memo

App E SEASP Infrastructure:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- e_seasp_infrastructure

App F 081816 SEASP Study Session MEP:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- f_081816_seasp-study-session-pc_mep

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 4 of 13 ends

Appendix G. Petitions:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/app- g_petitions-reduced

Recirculated DEIR NOA:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/noa_eir

Recirculated DEIR Summary of Revisions:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan- seasp/seasp_recirc_summary-of-revisions

Recirculated DEIR Chapter 5-16:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/ch_05-16- traffic_recirculated-02-16-17

Recirculated DEIR Appendix J1 TIA:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan- seasp/j1_seasp_tia_02_16_2017_final_website

Recirculated DEIR Appendix J2 TDM Plan:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan- seasp/j2_tdm_plan_2017_jan_2017

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 5 of 13 ends

Recirculated DEIR Appendix J3 VMT Memo:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/j3_seasp- vmt-memo-02-16-2017

SEASP NOA:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/seasp-noa

SEASP Hearing Draft Specific Plan:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan- seasp/web_seasp_hearing_review_draft_07122016-reduced

Local Coastal Program:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan- seasp/seasp_lcp_amendment_draft_07182016-reduced

Draft EIR Title Page:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/-_titlepage

Draft EIR Ch_00_TOC:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_00_toc

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 6 of 13 ends

Draft EIR Ch 01:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_01

Draft EIR Ch 02:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_02

Draft EIR Ch 03:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_03

Draft EIR Ch 04:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_04

Draft EIR Ch_05-00:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-00

Draft EIR Ch_05-01 AE:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-01-ae

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 7 of 13 ends

Draft EIR Ch_05-02 AG:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-02-ag

Draft EIR Ch_05-03 AQ:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-03-aq

Draft EIR Ch_05-04 BIO:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-04-bio

Draft EIR Ch_05-05 CUL:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-05-cul

Draft EIR Ch_05-06 GEO:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-06-geo

Draft EIR Ch_05-07 GHG:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-07-ghg

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 8 of 13 ends

Draft EIR Ch_05-08-HAZ:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-08-haz

Draft EIR Ch_05-09 HYD:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-09-hyd

Draft EIR Ch_05-10 LU:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-10-lu

Draft EIR Ch_05-11 MIN:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-11-min

Draft EIR Ch_05-12 N:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-12-n

Draft EIR Ch-05-13 PH:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-13-ph

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 9 of 13 ends

Draft EIR Ch_05-14 PS:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-14-ps

Draft EIR Ch_05-15 REC:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-15-rec

Draft EIR Ch_05-16 T:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-16-t

Draft EIR Ch_05-17 USS:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_05-17-uss

Draft EIR Ch_06:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_06

Draft EIR Ch_07:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_07

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 10 of 13 ends

Draft EIR Ch_08:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_08

Draft EIR Ch_09:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_09

Draft EIR Ch_10:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_10

Draft EIR Ch_11:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_11

Draft EIR Ch_12:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_12

Draft EIR Ch_13:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_13

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 11 of 13 ends

DEIR App Title Page:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/-_titlepage-appendices

DEIR App Ch_00_TOC:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/ch_00_toc-appendices

DEIR App A_NOP and Initial Study:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-a_southeast-area-sp-initial-study_10-21-15

DEIR App B_NOP Comments:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-b1_nop-comments-reduced

DEIR App C_AQ and GHG Modeling:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-c_airqualityghg

DEIR App D_Bio Resources and Wetland:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-d_biological-assessment-reduced

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 12 of 13 ends

DEIR App E_Cultural Resources:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-e_cultural-resources-rpt_web

DEIR App F_Geotechnical:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-f_geotech-summary-reduced

DEIR App G_Phase 0 Site Assessment:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-g_phase-0_small

DEIR App H_Infrastructure:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-h_infrastructure-technical-report-reduced

DEIR App I_Noise Modeling:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-i_noise-modeling

DEIR App J_TIA:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-j_seasp_tia_final

•
•
•
•
•
•

SOUTHEAST AREA SPECIFIC PLAN

PROGRAM ENVIRONMENTAL IMPACT REPORT
State Clearinghouse No. 2015101075

Page 13 of 13 ends

DEIR App K_Public Services Correspondence:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-k_ps-correspondence

DEIR App L_Water Supply Assessment:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-l_wsa-seasp

DEIR App M_Draft MMRP:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/app-m_seasp_draft-mmrp

Notice of Preparation:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/southeast-area-specific-plan-nop

Initial Study:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/southeast-area-specific-plan-initial-study

Comment Card:

https://www.longbeach.gov/globalassets/lbds/media-
library/documents/planning/environmental/environmental- reports/approvedcertified-part-2/southeast-area-specific-plan-seasp/draft-eir-and- appendices/communityworkshop4_commentcard_draft_2016-03-22

•
•
•
•
•
•
August 2017 | Mitigation Monitoring and Reporting Program Southeast Area Specific Plan
for City of Long Beach
Prepared for:

City of Long Beach
Contact: Christopher Koontz, AICP, Advance Planning Officer Development Services Department, Planning Bureau
333 W. Ocean Boulevard, 5th Floor
Long Beach, California 90802
562.570.6288
[email protected]
Prepared by:

PlaceWorks
Contact: Nicole Morse, Esq, Associate Principal
3 MacArthur Place, Suite 1100
Santa Ana, California 92707
714.966.9220
[email protected]
www.placeworks.com

BEXHIBIT
Mi1!:iga1!:ion Moni1!:oring and Reporting !Program

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page i
Section Page

1. INTRODUCTION.............................................................................................................................. 1

1.1 PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM............................1

1.2 PROJECT SUMMARY ...................................................................................................................................... 2

1.3 PROJECT LOCATION .................................................................................................................................... 4

1.4 MITIGATION MONITORING PROGRAM ORGANIZATION .......................................................... 4

Table Page
Table 1-1 Southeast Area Specific Plan Land Use Summary ........................................................................... 3 Table 1-2 Conventional Zoning Area .................................................................................................................. 4 Table 1-3 Mitigation Monitoring and Reporting Requirements ...................................................................... 5

List of Tables

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
Page ii PlaceWorks
This page intentionally left blank.

August 2017 Page 1

1. Introduction

1.1 PURPOSE OF MITIGATION MONITORING AND REPORTING

PROGRAM
This Mitigation Monitoring and Reporting Program (MMRP) has been developed to provide a vehicle to monitor mitigation measures and conditions of approval outlined in the Final Environmental Impact Report.

The MMRP has been prepared in conformance with Section 21081.6 of the Public Resources Code and City of Long Beach monitoring requirements. Section 21081.6 states:
(a) When making the findings required by paragraph (1) of subdivision subsection (a) of Section 21081 or when adopting a mitigated negative declaration pursuant to paragraph (2) of subdivision (c) of Section 21080, the following requirements shall apply:
(1) The public agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment. The reporting or monitoring program shall be designed to ensure compliance during project implementation. For those changes which have been required or incorporated into the project at the request of a responsible agency or a public agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so requested by the lead agency or a responsible agency, prepare and submit a proposed reporting or monitoring program. (2) The lead agency shall specify the location and custodian of the documents or other material which constitute the record of proceedings upon which its decision is based. (b) A public agency shall provide that measures to mitigate or avoid significant effects on the environment are fully enforceable through permit conditions, agreements, or other measures.

Conditions of project approval may be set forth in referenced documents which address required mitigation measures or, in the case of the adoption of a plan, policy, regulation, or other public project, by incorporating the mitigation measures into the plan, policy, regulation, or project design.
(c) Prior to the close of the public review period for a draft environmental impact report or mitigated negative declaration, a responsible agency, or a public agency having jurisdiction over natural resources affected by the project, shall either submit to the lead agency complete and detailed performance objectives for mitigation measures which would address the significant effects on the environment identified by the responsible agency or agency having jurisdiction over natural resources affected by the project, or refer the lead agency to appropriate, readily available guidelines or reference documents. Any mitigation measures

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 2 ends

submitted to a lead agency by a responsible agency or an agency having jurisdiction over natural resources affected by the project shall be limited to measures which mitigate impacts to resources which are subject to the statutory authority of, and definitions applicable to, that agency. Compliance or noncompliance by a responsible agency or agency having jurisdiction over natural resources affected by a project with that requirement shall not limit the authority of the responsible agency or agency having jurisdiction over natural resources affected by a project, or the authority of the lead agency, to approve, condition, or deny projects as provided by this division or any other provision of law.

The MMRP will serve to document compliance with adopted/certified mitigation measures that are formulated to minimize impacts associated with future development that would be accommodated by the Southeast Area Specific Plan.

1.2 PROJECT SUMMARY
The Project consists of a specific plan, general plan amendment, zoning ordinance amendment, and LCP amendment to shape the land use and development on 1,481 acres. The Project consists of two components:
1) the Southeast Area Specific Plan (SEASP; Specific Plan) covering 1,472 acres and 2) the conventional zoning area covering 9 acres. The conventional zoning area is described starting on Page 3-21 of this section.

Both of these areas constitute the “project” for purposes of CEQA, but are described separately below.

Southeast Area Specific Plan
The Southeast Area Specific Plan consists of 1,472 acres and includes 1,372 acres currently zoned “PD-1, SEADIP ,” 94 acres of the San Gabriel River and Los Cerritos Channel, and 6 acres along the southeast edge of the current PD-1 boundary. This 6-acre area is the result of a boundary adjustment between Los Angeles and Orange County that was approved by the local area formation commission in 2012, but never updated in PD-1. The proposed Specific Plan would replace the 1977 Southeast Area Development Improvement Plan (PD-1).

Land use designations would include: Single Family Residential, Multi-Family Residential, Mobile Homes, Commercial-Neighborhood, Mixed Use Community Core, Mixed Use Marina, Industrial, Public, Open Space and Recreation, Coastal Habitat/Wetlands/Recreation, Channel/Marina/Waterway, Right-of-Way /Caltrans, and Dedicated Right-of-Way (not built).

Land use statistics are provided in Table 1-1. Buildout of the Specific Plan as revised under the Reduced Intensity Alternative would allow a total of 6,663 dwelling units, 2,398,547 square feet of commercial/employment uses, and 375 hotel rooms.

S O U T H E A S T A R E A M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 3
Table 1-1 Southeast Area Specific Plan Land Use Summary Existing Projection Net Increase
Dwelling Units 4,079 6,663 2,584
Population 6,486 10,594 4,108
Commercial/Employment (SF) 2,091,476 2,398,547 307,071
Employees 3,555 3,704 149
Hotel Rooms 375 375 0
Acres 1,381 1 1,4722 0
Source: City of Long Beach; PlaceWorks (October 2015; March 2016).

1. The PD-1 boundary does not include portions of the San Gabriel River and the Los Cerritos Channel totaling 94 acres and 6 acres resulting from a County boundary adjustment approved by LAFCO.

2. The Project area consists of a total of 1,481 acres: 1) 1,472 acres within the proposed Specific Plan, which includes the 94 acres of waterways and 6 acres along the southeast boundary; and 2) 9 acres in the conventional zoning area that were in the PD-1 boundary but removed from the Specific Plan.

In addition to the required elements of the Specific Plan–such as, development standards, design guidelines– there are a number of project design features that have mitigating effects. Mobility improvements include enhanced roadway, bicycle, and pedestrian connectivity. SEASP Sections 7.2.2, Views, and 7.2.5, Special Edge Conditions, protect scenic views and require sensitive design adjacent to wetlands, marinas, and waterways.

SEASP Section 7.3.14, Bird-Safe Treatments, reduces impacts related to birds by addressing the interface between the wetlands (as essential bird habitat) and urban uses. It establishes criteria for lighting, landscaping, and façade treatments to minimize light pollution in natural areas and bird strikes. The proposed Specific Plan also establishes a Wetland Conservation and Monitoring Fund (SEASP Section 5.9) to preserve and restore wetlands and requires wetland buffers for development adjacent to wetlands (SEASP Section 5.10).

Conventional Zoning Area
The remaining nine acres of land in the Project area directly west of the Marina Vista Park are proposed to be extracted from the PD-1 zoning designation and converted to conventional zoning. This area would not be included in the proposed Specific Plan. Existing land uses in this area include single-family homes and a fire station. The proposed land use for this area was determined based on existing conditions and would be designated single-family residential. No new development is intended for this area, and no physical change (e.g., additional development intensity or redevelopment) is expected to occur; all existing uses within this area are expected to remain.

A conventional zoning designation (R-1-N, single family residential) was chosen to be consistent with the existing residential development. No new development is intended in this area. Given that the existing intensity of development is not expected to change, buildout projections for the nine-acre conventional zoning area assume no change in number of dwelling units or population. Buildout projections for the area are shown in Table 1-2.

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 4 ends

Table 1-2 Conventional Zoning Area
Existing Conventional Zoning/ R-Zone
Dwelling Units 39 39
Population 66 66
Public (SF) 16,693 16,693
Employees — —
Hotel Rooms — —
Acres 9 9
Notes: SF = square feet

1.3 PROJECT LOCATION
The Project area is on the southeast edge of the City of Long Beach, California, within Los Angeles County and bordering Orange County. The area encompasses 1,481 acres and consists of the area south of 7th Street, east of Bellflower Boulevard, east of the Long Beach Marine Stadium and Alamitos Bay docks, south of Colorado Street, and north and west of Long Beach’s southern boundary. The Los Cerritos Channel and San Gabriel River run through the Project area toward the Alamitos Bay and Pacific Ocean and are included as part of the Project area.

Regional access to the Project area is provided by Interstate 405 (I-405) and I-605. I-405 runs east-west, and the I-605 runs north-south near the northeastern portion of the Project area. Also, State Route 22 (SR-22) intersects with I-605 and runs east-west into the northeast portion of the Project area, and terminates as 7th Street along the Project’s northern boundary.

1.4 MITIGATION MONITORING PROGRAM ORGANIZATION
CEQA requires that a reporting or monitoring program be adopted for the conditions of project approval that are necessary to mitigate or avoid significant effects on the environment (Public Resources Code 21081.6). The mitigation monitoring and reporting program is designed to ensure compliance with adopted mitigation measures during project implementation. For each mitigation measure recommended in the DEIR, specifications are made herein that identify the action required and the monitoring and reporting that must occur. In addition, a responsible agency is identified for verifying compliance with individual conditions of approval contained in the MMRP . To effectively track and document the status of mitigation measures, a mitigation matrix has been prepared (see Table 1-3).

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 5
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor

5.3 AIR QUALITY
AQ-1 Applicants for new development projects within the Southeast Area Specific Plan shall require the construction contractor to use equipment that meets the US Environmental Protection Agency (EPA) Tier 4 emissions standards for off-road diesel-powered construction equipment with more than 50 horsepower, unless it can be demonstrated to the City of Long Beach that such equipment is not available. Any emissions control device used by the contractor shall achieve emissions reductions that are no less than what could be achieved by a Level 4 diesel emissions control strategy for a similarly sized engine, as defined by the California Air Resources Board’s regulations.

Prior to construction, the project engineer shall ensure that all demolition and grading plans clearly show the requirement for EPA Tier 4 or higher emissions standards for construction equipment over 50 horsepower. During construction, the construction contractor shall maintain a list of all operating equipment in use on the construction site for verification by the City of Long Beach. The construction equipment list shall state the makes, models, and numbers of construction equipment onsite. Equipment shall be properly serviced and maintained in accordance with the manufacturer’s recommendations. Construction contractors shall also ensure that all nonessential idling of construction equipment is restricted to five minutes or less in compliance with California Air Resources Board’s Rule 2449.

Prior to and during
construction
activities
Project
Applicant,
Engineer and
Construction
Contractor
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

I I

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 6 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
AQ-2 Applicants for new development projects within the Southeast Area Specific Plan shall require the construction contractor to prepare a dust control plan and implement the following measures during ground- disturbing activities—in addition to the existing requirements for fugitive dust control under South Coast Air Quality Management District (SCAQMD) Rule 403—to further reduce PM10 and PM2.5 emissions.

The City of Long Beach shall verify that these measures have been implemented during normal construction site inspections.

Following all grading activities, the construction contractor shall reestablish ground cover on the construction site through seeding and watering.

During all construction activities, the construction contractor shall sweep streets with SCAQMD Rule 1186–compliant,
PM10-efficient vacuum units on a daily basis if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling.

During all construction activities, the construction contractor shall maintain a minimum 24-inch freeboard on trucks
hauling dirt, sand, soil, or other loose materials and shall tarp materials with a fabric cover or other cover that
achieves the same amount of protection.

During all construction activities, the construction contractor shall water exposed ground surfaces and disturbed areas a minimum of every three hours on the construction site and a minimum of three times per day.

During all construction activities, the construction contractor shall limit onsite vehicle speeds on unpaved roads to no more than 15 miles per hour.

Heavy construction vehicles trips shall be limited to off-peak hours.

During ground-
disturbing activities
Project A
pplicant
and Construction
Contractor
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

•
•
.
•
•
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 7
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
AQ-3 Applicants for new development projects within the Southeast Area Specific Plan shall require the construction contractor to use coatings and solvents with a volatile organic compound (VOC) content lower than required under South Coast Air Quality Management District Rule 1113 (i.e., super compliant paints). The construction contractor shall also use precoated/natural-colored building materials, where feasible.

Use of low-VOC paints and spray method shall be included as a note on architectural building plans and verified by the City of Long Beach during construction.

During
construction
activities
Project A
pplicant
and Construction
Contractor
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
AQ-4 Prior to issuance of a building permit for new development projects within the Southeast Area Specific Plan, the property owner/developer shall show on the building plans that all major appliances (dishwashers, refrigerators, clothes washers, and dryers) to be provided/installed are Energy Star appliances. Installation of Energy Star appliances shall be verified by the City of Long Beach prior to issuance of a certificate of occupancy.

Prior to the
issuance of
building permits
Property Owner
/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
AQ-5 Prior to issuance of building permits for residential development projects within the Southeast Area Specific Plan, the property owner/developer shall indicate on the building plans that the following features have been incorporated into the design of the building(s).

Proper installation of these features shall be verified by the City of Long Beach prior to issuance of a certificate of occupancy.

For multifamily dwellings, electric vehicle charging shall be provided as specified in Section A4.106.8.2 (Residential Voluntary Measures) of the CALGreen Code and the Long
Beach Municipal Code.

Bicycle parking shall be provided as specified in Section A4.106.9 (Resi
dential Voluntary Measures) of the CALGreen
Code.

Prior to the
issuance of
building permits
Property Owner/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
.
.

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 8 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
AQ-6 Prior to issuance of building permits for n onresidential development projects within the Southeast Area Specific Plan, the property owner/developer shall indicate on the building plans that the following features have been incorporated into the design of the building(s). Proper installation of these features shall be verified by the City of Long Beach prior to issuance of a certificate of occupancy.

For buildings with more than ten tenant-occupants,
changing/shower facilities shall be provided as specified in Section A5.106.4.3 (Nonresidential Voluntary Measures) of the CALGreen Code.

Preferential parking for low-emitting, fuel-efficient, and carpool/van vehicles shall be provided as specified in
Section A5.106.5.1 (Nonresidential Voluntary Measures) of the CALGreen Code.

Facilities shall be installed to support future electric vehicle charging at each nonresidential building with 30 or more parking spaces. Installation shall be consistent with Section A5.106.5.3 (Nonresidential Voluntary
Measures) of the CALGreen Code and the Long Beach
Municipal Code.

Prior to the
issuance of
building permits
Property Owner
/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
.
.
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 9
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
AQ -7 New industrial land uses that have industrial equipment which requires a permit to operate from the South Coast Air Quality Management District, or have the potential to generate 40 or more diesel trucks per day, and are located within 1,000 feet of a sensitive land use (e.g. residential, schools, hospitals, nursing homes), as measured from the property line of the project to the property line of the nearest sensitive use, shall submit a health risk assessment (HRA) to the City of Long Beach prior to future discretionary project approval. The HRA shall be prepared in accordance with policies and procedures of the state Office of Environmental Health Hazard Assessment and the applicable air quality management district. If the HRA shows that the incremental cancer risk exceeds ten in one million (I0E 06), that particulate matter concentrations would exceed 2.5 µg/m3, or that the appropriate noncancer hazard index exceeds 1.0, the applicant will be required to identify and demonstrate that best available control technologies for toxics (T BACTs) are capable of reducing potential cancer and noncancer risks to an acceptable level, including appropriate enforcement mechanisms. T BACTs may include, but are not limited to, restricting idling onsite, electrifying warehousing docks to reduce diesel particulate matter, and requiring use of newer equipment and/or vehicles. T BACTs identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the project.

Prior to future
discretionary
project approval
Property Owner/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 10 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor

5.4 BIOLOGICAL RESOURCES
BIO-1 Concurrent with submittal of site development plans for development on or adjacent to undeveloped land and all land within the Coastal Habitat, Wetlands & Recreation land use, the project applicant shall submit a biological resources report conducted by a qualified biologist.

The biological resources report shall include: analysis of available literature and databases (CNDDB); historical sensitive biological resources; review of current land use and land ownership within the project vicinity; on-site survey and mapping that delineates vegetation communities present within the development area; identification of jurisdictional waters and special status habitat, wildlife, and plant species. Focused surveys for sensitive, threatened, endangered species, will also be prepared, as required. The project applicant shall demonstrate that the proposed development and project design avoids impacts to special status species and habitats, in consultation with CDFW and USFWS. If complete avoidance is not possible, the project applicant shall obtain necessary permits from CDFW and USFWS.

Prior to the issuance of grading permits, the project applicant shall submit plans, required permits, and mitigation plans (if needed) to the Long Beach Development Services Department for review and approval.

Concurrent with
submittal of site
development plans
and prior to the
issuance of
grading permits
Project Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
I I

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 11
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
BIO-2 Concurrent with submittal of site development plans for development on or adjacent to undeveloped land and all land within the Coastal Habitat, Wetlands & Recreation land use, the project applicant shall submit a jurisdictional delineation prepared by a qualified biologist or letters stating that no such jurisdictional features exist. The jurisdictional delineation shall be prepared pursuant to the requirements of (1) US Army Corps of Engineers (Corps) jurisdiction pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, (2) CDFW jurisdiction pursuant to Section 1602 of the Fish and Game Code, (3) RWQB jurisdiction pursuant to Section 401 of the Clean Water Act and Section 13260 of the Porter-Cologne Act, and (4) wetlands as defined under the California Coastal Act. The project shall be designed to avoid impacts to jurisdictional wetlands. If wetland avoidance is not possible, the applicant shall ensure no net loss of wetlands either by creation of applicant-sponsored wetlands or purchase of mitigation bank credits in consultation with applicable Federal- and State- agencies (Corps, CDFW, RWQB, and/or Coastal Commission). Any mitigation, replacement, and/or restoration of habitat shall occur in the LCWC or in an approved coastal mitigation bank that covers this area. If the applicant can demonstrate that there are no logistically viable opportunities for mitigation within the LCWC, the applicant may propose mitigation elsewhere, which must be approved by the City and the resource agencies. The mitigation plan prepared in consultation with the applicable agencies shall include: responsibilities and of persons to supervise and implement the plan, site selection, restoration and creation of habitat; site preparation and planting implementation, schedule, maintenance guidelines, monitoring plan (5 year minimum), and long-term preservation. Prior to the issuance of grading permits covering jurisdictional areas, the project applicant shall provide evidence to the Long Beach Development Services Department that (1) all necessary permits or authorizations have been obtained from the Corps (pursuant to Section 404 of the Clean Water Act), CDFW (pursuant to Section 1602 of the Fish and Game Code, and RWQCB (pursuant to Section 401 of the Clean Water Act), the Concurrent with
submittal of site
development plans
and prior to the
issuance of
grading permits
Project Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 12 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
Coastal Commission, or that no such permits are required; and (2) the detailed mitigation and restoration plan shall be approved by the Development Services Department.

BIO-3 If sensitive biological resources are identified within or abutting to the proposed development area, the project applicant shall submit evidence to the Long Beach Development Services Department that a qualified biologist has been retained to prepare a construction management plan. The construction limits shall be clearly flagged and/or fenced. No construction access, parking, storage of equipment, or waste dirt or rubble will be permitted within such marked areas. A monitoring biologist shall be onsite during any grading activities. The qualified biologist shall also develop and implement a project specific contractor training program to educate project contractors on the sensitive biological resources within and adjacent to the proposed development project area and oversee measures to avoid and/or minimize impacts to these species.

Prior to the
issuance of
grading permits
Project Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 13
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
BIO-4 Prior to the issuance of grading permits for any development, the project applicant shall include noise reduction measures to reduce noise impacts to wildlife. A note shall be provided on development plans indicating that throughout grading, demolition, and construction, the property owner/developer shall be responsible for requiring contractors to implement the following measures to limit construction- related noise:

During all excavation and grading on-site, the construction contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers, consistent with manufacturers’ standards.

The construction contractor shall place all stationary
construction equipment so that emitted noise is directed away from sensitive receptors (wildlife) nearest the project site.

The construction contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise sources and noise-sensitive
receptors (wildlife) during all project construction.

No construction shall occur within 500 feet of nesting raptors or threatened or endangered species and 100 feet of all other nesting birds protected by the federal Migratory Bird Treaty Act.

Prior to the
issuance of
grading permits
Project Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
BIO-5 Prior to approval of any development adjacent to jurisdictional waters or habitat for special status species and all land within the Coastal Habitat, Wetlands & Recreation land use, the project applicant shall submit a photometric plan demonstrating that the project will be designed and shielded so that the project’s contribution of nighttime lighting shall be no greater than 0.10 foot-candles at the edge of the habitat. This would ensure that spill light does not result in exposure of artificial light at levels exceeding the intensity of moonlight (approximately 0.5 foot-candles).

Prior to approval of
any development
adjacent to
jurisdictional
waters or habitat
for special status
species and all
land within the
Coastal Habitat
Project Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
•
.
.
.

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 14 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
BIO-6 Prior to approval of a trails/access plan within or adjacent to jurisdictional waters, the location, design, and text for urban-open space interface signage shall be developed. The signage shall be located at all pedestrian access points. The signage shall educate users on the responsibilities associated with the open space interface and shall address relevant issues including the role of natural predators in the wildlands and how to minimize impacts of human and domestic pets on native communities and their inhabitants.

Prior to approval of
a trails/access plan
within or adjacent
to jurisdictional
waters
Project Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
BIO-7 Prior to the issuance of building permits, the project applicant and/or subsequent builder shall prepare an urban-open space interface brochure to be approved by the Long Beach Development Services Department to educate residents on the responsibilities associated with living near sensitive biological habitat. The brochure shall address relevant issues, including the role of natural predators in the wildlands and how to minimize impacts of human and domestic pets on native communities and their inhabitants, including the “Light’s Out for Birds” programs. The approved brochure, along with attachments, shall be included as part of the rental/lease agreements and as part of the sales literature for future developments.

Prior to the
issuance of
building permits
Project Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 15
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
BIO-8 If construction is proposed between January 15 to September 1st, a qualified biologist must conduct a nesting bird survey(s) no more than three days prior to initiation of construction activities to document the presence or absence of nesting birds in or adjacent to the project site.

The preconstruction survey(s) will focus on identifying any raptors and/or passerines nests that may be directly or indirectly affected by construction activities. Any nest permanently vacated for the season would not warrant protection pursuant to the Migratory Bird Treaty Act.

If active nests are documented, the following measures are required:

Species-specific measures shall be prepared by a qualified biologist and implemented to prevent abandonment of the active nest. At a minimum, grading in the vicinity of a nest shall be postponed until the young birds have fledged. A minimum exclusion buffer of 100 feet shall be maintained during construction, depending on the species and location.

The perimeter of the nest setback zone shall be fenced or adequately demarcated with stakes and flagging at 20-foot intervals, and construction personnel and activities are restricted from the area.

A survey report by a qualified biologist verifying that no active nests are present, or that the young have fledged, shall be submitted to the Long Beach Development Services Department prior to initiation of grading in the nest-setback zone. The qualified biologist shall serve as a biological monitor during those periods when construction activities occur near active nest areas to ensure that no inadvertent impacts on these nests occur.

A final report of the findings, prepared by a qualified biologist, shall be submitted to the Long Beach Development Services Department prior to construction-related activities that have the potential to disturb any active nests during the nesting season.

No more than
three days prior to
initiation of
construction
activities
Project Applicant/
Developer and a
qualified biologist
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
.
•
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 16 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor

5.5 CULTURAL RESOURCES
CUL-1 Future development or redevelopment projects on or near buildings or structures 45 years of age or older shall require an intensive-level historical evaluation. Prior to issuance of grading permits, the project applicant/developer shall prepare the evaluation in accordance with all applicable federal, state, and local guidelines for evaluating historical resources. If, based on the evaluation of the property, it is determined that the proposed development or redevelopment project will have a substantial adverse effect on a historical resource (i.e., it would reduce its integrity to the point that it would no longer be eligible for inclusion in the California Register of Historical Resources or in the list of Long Beach Landmarks), then the provisions of Mitigation Measure CUL-2 shall be implemented by the property owner or project
applicant/developer to eliminate or reduce the project’s impact on historical resources.

Prior to issuance
of grading permits
Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
CUL-2 If, based on the intensive-level historical evaluation required under Mitigation Measure CUL-1, it is determined that the proposed development or redevelopment project will have a substantial adverse effect on a historical resource, the City of Long Beach shall require the property owner or project applicant/developer to implement the following measures:

A. Rehabilitation According to the Secretary of the Interior’s Standards

1. If the proposed project includes renovation, alteration, or an addition to a historical resource (not including total
demolition), then the property owner or project
applicant/developer shall first seek to design all proposed renovation, alterations, or additions to the historical resource in a manner that is consistent with the Secretary of the Interior’s Standards for Rehabilitation (Standards), found at:
http://www.nps.gov/tps/standards/rehabilitation/rehab/stand. htm.

Prior to any
disturbance of a
historical resource
,
as determined by
the intensive-level
historical
evaluation of a
property
Property Owner
or Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
I I

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 17
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
a.Plans for rehabilitation shall be created under the
supervision of a professional meeting the Department of Interior’s Professional Qualifications Standards in
Architectural History or Historic Architecture and be
designed by a licensed architect with demonstrated
historic preservation experience.
b. Plans shall be reviewed in the schematic design phase prior to any construction work, as well as in the 60 and 90 percent construction documents phases, for compliance
with the Standards by a historic preservation professional meeting the Secretary of the Interior’s Professional
Qualifications Standards with demonstrated experience
with the Standards compliance reviews.
c. The qualified historic preservation professional reviewing the plans shall create a technical memo at each phase
and submit the memo to the City of Long Beach
Development Services Department for concurrence.
d. At the discretion of the City, a detailed character-defining features analysis and/or historical resource treatment plan may need to be prepared for select historical resources by a historic preservation professional meeting the Secretary of the Interior’s Professional Qualifications Standards if the nature of the project or the significance of the property warrants such detailed analysis.
e. A qualified historic preservation professional shall monitor construction activities at key milestones to ensure that the work to be conducted complies with the Standards. The
milestones shall be agreed upon in advance by the City
and property owner or project applicant/developer.
f. City staff and the qualified historic preservation
professional shall review the finished
rehabilitation/renovation in person upon completion.
g. In the event that any historical resource(s) are leased to

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 18 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
third-party tenants and tenant improvements will be made, all of the terms of this stipulation shall be disclosed in the lease agreements, agreed upon in writing, and mutually
enforced by the property owner or project
applicant/developer and the City. The tenants shall not be permitted to conduct work that does not comply with the Standards.

B. Retention/On-Site Relocation- For Proposed Demolition

1. If the proposed project includes total demolition of a historical resource, the property owner or project
applicant/developer shall first consider an alternative that retains the historical resource and incorporates it into the overall project development as an adaptive re-use of the building.

2. If the project site permits, the historical resource should be relocated to another location on the site, and the resource should be reincorporated into the overall project.

3. If the City determines that retention/onsite relocation of the historical resource is not feasible through a credible
feasibility study, the City shall elect to allow the property owner or project applicant/developer to move forward with the development/redevelopment project; however, all other requirements outlined in this mitigation measure shall apply.

C. Third Party Sale

1. If the City determines that retention or onsite relocation of the historical resource is not feasible, then the property owner or project applicant/developer shall offer any historical resources scheduled for demolition to the public for sale and offsite relocation by a third party:
a. The historic resource(s) shall be advertised by the
property owner or project applicant/developer at a
minimum in the following locations: project
applicant’s/developer’s website (if applicable); City of

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 19
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
Long Beach website; Los Angeles Times website and
print editions; Long Beach Press Telegram.
b. The bidding period shall remain open for 60 days after the date of advertisement to allow adequate response
time from interested parties.
c. Qualified parties shall meet the following minimum
qualifications to be considered a realistic buyer:
possess adequate financial resources to relocate and
rehabilitate the historical resource(s); possess an
available location for the historical resource(s); and
provide for a new use for the historical resource(s).
d. The City shall approve the qualified buyer. If no such buyer comes forward within the allotted time frame, the City shall elect to issue a demolition permit for the
historical resource. However, all other requirements
outlined in this mitigation measure shall apply.

D. Recordation

1. The property owner or project applicant/developer shall create HABS-like Level II documentation prepared in
accordance with the Secretary of the Interior’s Standards and Guidelines for Architectural and Engineering
Documentation. Information on the Standards and
Guidelines is available at the following links:
http://www.nps.gov/history/local-law/arch_stnds_6.htm.
http://www.nps.gov/history/hdp/standards/index.htm.
a. Photographs with large-format black-and-white
negatives (4 inches by 5 inches or larger) of the
property as a whole shall be provided; photocopies with large format negatives of select existing drawings, site plans, or historic views where available. A minimum of
12 views showing context and relationship of historical resources to each other shall be provided; aerial views showing the whole property shall also be provided.

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 20 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
b.Written historical descriptive data, index to
photographs, and photo key plan shall be provided.
c. The above items shall be created by a historic
preservation professional meeting the Secretary of the
Interior’s Professional Qualifications Standards with
demonstrated experience in creating HABS Level II
documentation.
d. The above items shall be created prior to any
demolition or relocation work.
e. The above items shall be distributed to the following repositories for use by future researchers and
educators. Before submitting any documents, each of
the following repositories shall be contacted to ensure that they are willing and able to accept the items: City of Long Beach Public Library; Long Beach Historical
Society; Los Angeles Public Library; South Central
Coastal Information Center at California State
University, Fullerton; and City of Long Beach
Development Services Department (building files).

E. Salvage and Reuse

1. If offsite relocation of the historical resource by a third party is not accomplished, the property owner or project
applicant/developer shall create a salvage and reuse plan identifying elements and materials of the resource that can be saved prior to any demolition work.
a. The salvage and reuse plan shall be included in bid
documents prepared for the site and shall be created
by a historic preservation professional meeting the
Secretary of the Interior’s Professional Qualifications Standards with demonstrated experience in creating
salvage and reuse plans.
b. Elements and materials that may be salvageable
include windows; doors; roof tiles; decorative elements;

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 21
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
bricks, foundation materials, and/or paving materials;
framing members; furniture; lighting; and flooring
materials, such as tiles and hardwood.

2. The property owner or project applicant/developer shall identify individuals, organizations, or businesses interested in receiving the salvaged items; these may include Habitat for Humanity Restore; other affordable housing
organizations; or salvage yards. The following steps shall be taken by the property owner or project applicant/developer:
a. Identification of the individuals, organizations, or businesses interested in receiving the salvaged items
shall be completed in consultation with the City.
b. Identification of the individuals, organizations, or businesses interested in receiving the salvaged items
shall be accomplished by contacting potentially
interested parties directly first.
c. Items to be salvaged shall be advertised in the
following locations for a period of 60 days if none of the contacted parties are able to receive the items: Los
Angeles Times and Long Beach Press Telegram.

3. The property owner or project applicant/developer shall remove salvageable items in the gentlest, least destructive manner possible. Historic materials and features shall be protected by storing salvaged items in indoor, climate- and weather-controlled conditions until recipients can retrieve them. The removal of salvageable items shall be performed by a licensed contractor with demonstrated experience with implementing salvage and reuse plans.

F. Other Optional Interpretive, Commemorative, or Educational Measures
The City may also elect to require additional (optional) mitigation measures crafted in response to a specific historical resource’s

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 22 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
property type or significance, association with a specific historic person, or overall value to the community, as practical, so long as the measure is commensurate with the significance of the property and the level of impact to that resource. Such measures may include educational or interpretive programming; signage; incorporation of historical features into new developments or public art; contribution to a mitigation fund for future historic preservation efforts; written histories or contexts important to the public’s understanding of the lost resource (presuming no other extant resource can interpret such significance); etc. The need for these additional measures shall be determined by the City on a case-by-case basis and incorporated into the conditions of approval for the project. Some measures may be made available to the public through museum displays, written reports at research repositories, on- or offsite signage, or existing online multimedia sites.

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 23
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
CUL-3 Prior to the issuance of grading permits, and for any subsequent permit involving excavation to increased depth, the project applicant for each development or redevelopment project considered for approval pursuant to the Southeast Area Specific Plan shall provide letters to the City of Long Beach from a qualified archaeologist and paleontologist (for excavations five feet below ground surface and deeper) who meet the Secretary of the Interior’s Professional Qualifications Standards.

The letters shall state that the project applicant has retained these individuals, and that the archaeological consultant will be present during all grading in previously undisturbed areas and other significant ground-disturbing activities and that the paleontological consultant will be present during all grading that occurs below 5 feet from the ground surface. In the event archeological or paleontological resources are discovered during ground-disturbing activities, the professional archeological or paleontological monitor shall have the authority to halt any activities adversely impacting potentially significant cultural resources until they can be formally evaluated. Suspension of ground disturbances in the vicinity of the discoveries shall not be lifted until the archaeological and/or paleontological monitor, in coordination with the construction contractor, has evaluated discoveries to assess whether they are significant cultural resources, pursuant to the California Environmental Quality Act (CEQA). If significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies. The resources shall be offered for curation or preservation to a repository with a retrievable collection system and an educational and research interest in the materials, such as the Los Angeles County Museum of Natural History or California State University, Fullerton, or other local museum or repository. If no museum or repository is willing to accept the resource, the resource shall be considered the property of the City and may be stored, disposed of, transferred, exchanged, or otherwise handled by the City at its discretion.

Prior to the
issuance of
grading permits,
and for any
subsequent permit
involving
excavation to
increased depth
Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 24 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
CUL-4 At least 30 days prior to ground disturbance by each project development or redevelopment in conformance with the Specific Plan, the City of Long Beach would notify the three Native American tribal representatives who requested Native American monitoring of ground- disturbing activities (Gabrieleño Band of Mission Indians Kizh Nation, Gabrieleño/Tongva Band of Mission Indians, and Juaneño Band of Mission Indians Acjachemen Nation). For each project, the project applicant would retain one certified Native American monitor who would accompany the professional archaeological monitor during on-call monitoring. The Native American monitor would have the same authority to halt activities that could adversely impact archaeological or tribal cultural resources that the professional archaeological monitor would. The Native American monitor would recommend measures to avoid, preserve, and/or recover Native American archaeological and/or tribal cultural resources, as practicable, and would convey such resources to the pertinent tribe or most likely descendant, as applicable.

At least 30 days
prior to ground
disturbance
Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
CUL-5 Any development that is proposed on undeveloped or vacant land shall prepare a Phase I Cultural Resources Investigation prior to the issuance of grading permits. The cultural report shall be prepared by a qualified archeologist consistent with the most recent standards and guidelines. The report shall set forth criteria for evaluating the significance of resources discovered during construction and identify appropriate data recovery methods and procedures to mitigate project impacts on significant resources. At a minimum, the report shall include a summary of available information on known sites and sensitive locations in the project area; a historical context for the evaluation of resources that may be encountered during construction; data requirements and the appropriate field and laboratory methods to be used to acquire data needed for significance evaluation and impact mitigation. The report will also identify specific locations where cultural resources monitors would be required during grading and identify reporting and curating requirements for artifacts uncovered during Prior to the
issuance of
grading permits
Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 25
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
construction.

CUL-6 If human remains are encountered during construction excavation and grading activities, State Health and Safety Code Section 7050.5 requires that no further disturbance shall occur until the county coroner has made the necessary findings as to origin and disposition, pursuant to Public Resources Section 5097.98. If the remains are determined to be of Native American descent, the coroner has 24 hours to notify the NAHC. The NAHC will then identify the person(s) thought to be the most likely descendent of the deceased Native American, who will then help determine what course of action should be taken in dealing with the remains. Preservation of the remains in place or project design alternatives shall be considered.

Within 24 hours of
discovering human
remains of Native
American descent
Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 26 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor

5.8 HAZARDS AND HAZARDOUS MATERIALS
HAZ-1 Prior to the issuance of grading permits for individual development projects within the Southeast Area Specific Plan, the project applicant/developer shall submit a Phase I Environmental Site Assessment (ESA) to the City of Long Beach Development Services Department to identify environmental conditions of the development site and determine whether contamination is present. The Phase I ESA shall be prepared by an Environmental Professional in accordance with the American Society for Testing and Materials (ASTM) Standard E 1527.13, Standard Practice for Environmental Site Assessments:

Phase I Environmental Site Assessment Process. If recognized environmental conditions related to soils or groundwater are identified in the Phase I ESA, the project applicant shall perform soil and soil gas sampling, as required, as a part of a Phase II ESA. If contamination is found at significant levels, the project applicant shall remediate all contaminated soils with the oversight and in accordance with state and local agency requirements (California Department of Toxic Substances Control, Regional Water Quality Control Board, Long Beach Fire Department, etc.). All contaminated soils and/or material encountered shall be disposed of at a regulated site and in accordance with applicable laws and regulations prior to the completion of grading. Prior to the issuance of building permits, a report documenting the completion, results, and any follow-up remediation on the recommendations, if any, shall be provided to the City of Long Beach Development Services Department evidencing that all site remediation activities have been completed.

Prior to the
issuance of
grading permits
Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

I I

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 27
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
HAZ-2 If soil is encountered during Project area development that is suspected of being impacted by hazardous materials, work at the subject construction activity area shall be halted, and the suspect site conditions shall be evaluated by a qualified environmental professional.

The results of the evaluation shall be submitted to the Department of Toxic Substances Control (DTSC), or the Los Angeles Regional Water Quality Control Board (RWQCB) or other applicable oversight agency, as appropriate, and the necessary response/remedial measures shall be implemented—as directed by DTSC, RWQCB, or other applicable oversight agency—until all specified requirements of the oversight agencies are satisfied and a no further action status is attained.

During grading
activities
Project
Applicant/
Developer
Long Beach
Development
Services
Long Beach
Development
Services

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 28 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
HAZ-3 Prior to the issuance of demolition permits for any buildings or structures, the project applicant/developer shall conduct the following inspections and assessments for all buildings and structures onsite and shall provide the City of Long Beach Development Services Department with a copy of the report of each investigation or assessment.

The project applicant shall retain a California Certified Asbestos Consultant (CAC) to perform abatement project
planning, monitoring (including air monitoring), oversight, and reporting of all asbestos-containing materials (ACM) encountered. The abatement, containment, and disposal of all ACM shall be conducted in accordance with the South Coast Air Quality Management District’s Rule 1403 and
California Code of Regulation Title 8, Section 1529
(Asbestos).

The project applicant shall retain a licensed or certified lead inspector/assessor to conduct the abatement, containment, and disposal of all lead waste encountered. The contracted lead inspector/assessor shall be certified by the California Department of Public Health (CDPH). All lead abatement shall be performed by a CDPH-certified lead supervisor or a CDPH- certified worker under the direct supervision of a lead supervisor certified by CDPH. The abatement, containment, and disposal of all lead waste encountered shall be conducted in accordance with the US Occupational Safety and Health Administration Rule 29; CFR Part 1926; and California Code of Regulation, Title 8, Section 1532.1 (Lead).

Evidence of the contracted professionals attained by the project applicant shall be provided to the City of Long Beach Development Services Department. Additionally, contractors performing ACM and lead waste removal shall provide
evidence of abatement activities to the City of Long Beach Building and Safety Bureau.

Prior to the
issuance of
demolition permits
Project
Applicant/
Developer
Long Beach
Development
Services
Long Beach
Development
Services

.
•
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 29
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor

5.9 HYDROLOGY AND WATER QUALITY
HYD-1 Prior to the issuance of permits for any development or redevelopment projects pursuant to the Southeast Area Specific Plan, the City of Long Beach shall ensure that the following drainage improvements are fully funded for and implemented:

Any development or redevelopment project that would
impact existing storm drain facilities within the Southeast Area Specific Plan area (public and private) that is less than 24-inches in size shall fully fund upsizing of such facilities to a minimum 24-inch or greater pipe size as prescribed by City of Long Beach Public Works Department.

Any development or redevelopment project that would
impact the four segments of City of Long Beach’s storm
drains in Pacific Coast Highway for which improvements
were recommended by the 2005 Master Plan of Drainage
Update shall fully fund upsizing of those storm drain
segments as indicated below or other final size as
prescribed by City of Long Beach Public Works Department.

Segments 220835 and 220015 to 30 inches;
Segment 220805 to 54 inches;
Segment 220710 to 84 inches.

Any development or redevelopment project that would
impact the four segments of City of Long Beach’s storm
drains in Seville Way (Segment 220810) for which
improvements were recommended by the 2005 Master Plan
of Drainage Update shall fully fund upsizing of that storm drain segment to 48 inches or other final size as prescribed by City of Long Beach Public Works Department.

Prior to the
issuance of
grading or
building permits
Long Beach
Development
Services
Department in
coordination with
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

I I
.
.
.
■
■
.

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 30 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
HYD-2 Prior to the issuance of grading permits for any development or redevelopment projects pursuant to the Southeast Area Specific Plan, project applicants/developers of such projects shall prepare a site- specific hydrology and hydraulic study of the on-site and immediate off- site storm drain systems to determine capacity and integrity of the existing systems. The hydrology and hydraulic study shall be submitted to City of Long Beach Public Works Department for review and approval.

Prior to the
issuance of
grading or
building permits
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

HYD-3 The project applicant/developer of each development or redevelopment project that would be accommodated by the Southeast Area Specific Plan shall request the “allowable discharge rate” – which limits peak flow discharges as compared to existing conditions based on regional flood control constraints – from the Los Angeles County Department of Public Works, and shall comply with such discharge rate. Compliance with the “allowable discharge rate” shall be demonstrated in the hydrology and hydraulic study to be completed pursuant to Mitigation Measure HYD-2.

Prior to the
issuance of
grading or building
permits
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

HYD-4 The project applicant/developer, architect, and construction contractor for each development or redevelopment project that would be accommodated by the Southeast Area Specific Plan shall incorporate low-impact development (LID) best management practices (BMPs) within the respective project, providing for water quality treatment and runoff reduction and/or detention in accordance with local stormwater permit requirements.

Prior to the
issuance of
grading or building
permits
Project
Applicant/
Developer,
Architect, and
Construction
Contractor
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

HYD-5 Upon submission of development applications for development projects in the tsunami inundation zone (as identified in the City’s Natural Hazards Mitigation Plan) the Development Services Department shall provide project applicants with tsunami awareness and preparedness materials.

During
development
applications
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 31
Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
HYD-6 Prior to certificate of occupancy, project applicants and developers shall demonstrate to the Development Services Department that lease agreements and disclosures provided to homeowners and tenants disclose that those parties would be in a tsunami inundation zone (as identified in the City’s Natural Hazards Mitigation Plan). This notification shall include tsunami awareness and preparedness materials as well as information outlining applicable evacuation plans and routes.

Prior to certificate
of occupancy
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

5.12 NOISE
N-1 Prior to issuance of demolition, grading, and/or building permits for development projects accommodated by the Southeast Area Specific Plan, a note shall be provided on development plans indicating that ongoing during grading, demolition, and construction, the property owner/developer shall be responsible for requiring contractors to implement the following measures to limit construction-related noise:

Construction activity is limited to the daytime hours between 7 AM to 7 PM on Monday through Friday and 9 AM to 6 PM
on Saturday, as prescribed in the City’s municipal code.

Construction is prohibited on Sundays.

All internal combustion engines on construction equipment and trucks are fitted with properly maintained mufflers.

Stationary equipment such as generators and air
compressors shall be located as far as feasible from nearby noise-sensitive uses.

Stockpiling is located as far as feasible from nearby noise- sensitive receptors.

Construction traffic shall be limited to the haul routes established by the City of Long Beach.

Prior to issuance
of demolition,
grading, and/or
building permits
Project
Applicant/
Developer and
Architect
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

I I
.
. .
. .

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 32 ends

Table 1-3 Mitigation Monitoring and Reporting Requirements Mitigation Measure Timing
Responsible
Implementing
Party
Responsible
Monitoring Party
Document
Location
(Monitoring
Record)
Completion Date
Responsible
Monitoring Party
Project Mitigation
Monitor
N-2 Prior to issuance of a building permit for any development project requiring pile driving or blasting, the project applicant/developer shall prepare a noise and vibration analysis to assess and mitigate potential noise and vibration impacts related to these activities. The maximum levels shall not exceed 0.2 inch/second, which is the level that can cause architectural damage for typical residential construction. If maximum levels would exceed these thresholds, alternative methods such static rollers, nonexplosive blasting, and drilling piles as opposed to pile driving shall be used..

Prior to the
issuance of
building permits
Project
Applicant/
Developer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

N-3 Prior to issuance of a building permit for projects involving the development of new industrial uses within 200 feet of any existing residential use, the property owner/developer shall retain an acoustical engineer to conduct an acoustic analysis that includes a vibration analysis for potential impacts from vibration generated by industrial activities. The detailed acoustical analysis shall be submitted to the City of Long Beach Development Services Department for review and shall demonstrate that the vibration levels at any nearby residential use would be below 78 VdB during the daytime (7 AM to 10 PM) and 72 VdB during the nighttime (10 PM to 7 AM), which are the Federal Transit Administration’s daytime and nighttime criteria to regulate general vibration impacts at affected residential uses.

Prior to the
issuance of
building permits
Project
Applicant/
Developer and
Acoustical
Engineer
Long Beach
Development
Services
Department
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 33

5.16 TRANSPORTATION AND TRAFFIC
TRAF-1 Prior to the issuance of the first building permit pursuant to the proposed Project, the City of Long Beach shall update the City’s traffic mitigation fee program to include the improvements outlined in Mitigation Measure TRAF-3. The City shall prepare a "nexus" study that will serve as the basis for requiring development impact fees under AB 1600 legislation, as codified by California Code Government Section 66000 et seq., to support changes under consideration for the SEASP. The established procedures under AB 1600 require that a "reasonable relationship" or nexus exist between the traffic improvements and facilities required to mitigate the traffic impacts of new development pursuant to the proposed Project.

Traffic improvements and facilities necessary to mitigate the Project impacts shall be included, among other improvements, in the AB 1600 nexus study. The City’s fee program shall be updated based on the nexus study. Fees are assessed when there is new construction, an increase in square footage in an existing building, or the conversion of existing square footage to a more intensive use. The development fees collected are applied toward circulation improvements and right-of-way acquisition.

Fees are calculated by multiplying the proposed square footage, dwelling unit, or hotel room by the appropriate rate. Traffic mitigation fees are included with any other applicable fees payable at the time the building permit is issued. The City will use the traffic mitigation fees to fund construction (or to recoup fees advanced to fund construction) of the transportation improvements identified in Mitigation Measure TRAF-3.

Prior to issuance
of the first building
permit
City of Long
Beach
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

TRAF-2 As part of the subsequent environmental review for development projects that would be accommodated by the SEASP, a site-specific traffic study shall be prepared by the project applicant/developer to evaluate the project’s potential traffic and transportation impacts consistent with the City of Long Beach Guidelines for Signalized Intersections and the Los Angeles County CMP Guidelines to identify specific improvements, as deemed necessary, to provide safe and efficient onsite circulation and access, and limit cut through traffic on adjacent neighborhoods. The traffic study for the first development project to be considered under the SEASP shall include an analysis of signal timing of 2nd Street through Naples to identify timing adjustments needed to improve signal synchronization.

The traffic study shall be approved by the Public Works Department.

Payment of fees, construction of improvements, and signal timing shall be implemented prior to issuance of a building permit.

As part of the
subsequent
environmental
review for
development
projects
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 34 ends

TRAF-3 Prior to issuance of building permits for development projects that would be accommodated by the SEASP, project applicants/developers shall make fair-share payments to the City of Long Beach toward construction of the traffic improvements listed below. The following traffic improvements and facilities are necessary to mitigate impacts of the SEASP and shall be included in the City’s fee mechanism(s):

Existing With Project Improvements
Studebaker Road & SR-22 Westbound Ramps: Construct a spiral striped roundabout with two circulating lanes, with a southbound slip (bypass) lane. The southbound approach would be striped with two through lanes and one shared through-left turn lane; the westbound approach would have two left turn lanes and one right turn slip lane; and the northbound approach would have two through lanes and one right turn slip lane. This measure would be funded through the City of Long Beach Capital Improvement Plan (CIP) and fair-share contributions from area developments.

3. Studebaker Road & SR-22 Westbound Ramps: Construct a spiral striped roundabout with two circulating lanes, with a southbound slip (bypass) lane. The southbound approach would be striped with two through lanes and one shared through-left turn lane; the westbound approach would have two left turn lanes and one right turn slip lane; and the northbound approach would have two through lanes and one right turn slip lane. This measure would be funded through the City of Long Beach Capital Improvement Plan (CIP) and fair-share contributions from area developments. Alternatively, the intersection could remain signalized with the following improvements:

Modify the westbound approach from two left turn lanes and one right turn lane, to three left turn lanes and one right turn lane.

Modify the southbound approach from one left turn lane and one through lane, to one left turn lane and three through lanes.

Optimize the AM and PM signal cycle lengths and splits.

17. Shopkeeper Road & 2nd Street: This intersection would require the following improvements:

Modify the northbound approach from one shared through- left turn lane and one right turn lane, to one shared through- left turn lane and two right turn lanes.

Prior to the
issuance of
occupancy permits
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

•
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 35
Modify the westbound approach from one left turn lane, two through lanes, and one shared through-right turn lane, to two left turn lanes, two through lanes, and one shared
through-right turn lane.

27. 2nd Street & Bay Shore Ave Avenue: This intersection would require the following improvements:

Reconfigure the northbound approach to provide a
dedicated left-turn lane, and a shared through/right-turn lane.

Add a southbound right-turn lane.

Add an eastbound right-turn lane and restripe the shared through/right-turn lane as a through lane.

Cumulative Year (2035) With Project Improvements

3. and 11. Studebaker Road & SR-22 West- and Eastbound Ramps:

Construct a spiral striped roundabout with two circulating lanes, with a southbound slip (bypass) lane. The southbound approach would be striped with two through lanes and one shared through-left turn lane; the westbound approach would have two left turn lanes and one right turn slip lane; and the northbound approach would have two through lanes and one right turn slip lane. This measure would be funded through the City of Long Beach Capital Improvement Plan (CIP).

Alternatively, the intersection could remain signalized and with the following improvements:

Modify the westbound approach from two left turn lanes and one right turn lane, to three left turn lanes and one right turn lane.

Modify the northbound approach from one through lane and one shared through-right turn lane, to two through lanes and one shared through-right turn lane.

Modify the southbound approach from one left turn lane and one through lane, to one left turn lane and three through lanes.

Optimize the AM and PM signal cycle lengths and splits.

15. Marina Drive & 2nd Street: This intersection would require the following improvements:

Modify the northbound approach from one left turn lane, one •
•
•
.
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 36 ends

shared through-left turn lane, one through lane, and one right turn lane, to two left turn lanes, one through lane, and one right turn lane.

Modify the southbound approach from one left turn lane, one shared through-left turn lane, and one right turn lane, to two left turn lanes, one through lane, and one right turn lane.

Modify the westbound approach from one left turn lane, two through lanes, and one shared through-right turn lane, to two left turn lanes, two through lanes, and one shared
through-right turn lane.

17. Shopkeeper Road & 2nd Street: This intersection would require the following improvements:

Modify the westbound approach from one left turn lane, two through lanes, and one shared through-right turn lane, to two left turn lanes, two through lanes, and one shared
through-right turn lane.

Modify the eastbound approach from one left turn lane, two through lanes, and one shared through-right turn lane, to one left turn lane, three through lanes, and one right turn lane.

20. PCH & Studebaker Road: This intersection would require the following improvements:

Modify the southbound approach from one left turn lane, two through lanes, one right turn lane, and one right turn lane, to one left turn lane, three through lanes, one right turn lane.

Optimization of the PM signal cycle lengths and splits.

•
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 37
TRAF-4 Prior to issuance of building permits for development projects that would be accommodated by the SEASP, project applicants/developers shall make fair-share payments to the City of Seal Beach toward construction of the traffic improvement listed below. Fair-share payments shall occur through either: 1) an agreement between the developer and City of Seal Beach to pay fair share funding for the improvement or 2) payment to the City of Seal Beach traffic mitigation fee program that is based on nexus requirements contained in the Mitigation Fee Act (Govt. Code § 66000 et seq.) and 14 Cal. Code of Regs. § 15126.4(a)(4). The traffic mitigation fee program must include the intersection improvements identified below. If the City’s traffic fee program has not incorporated the intersections identified below at the time of building permits and the applicant has made reasonable efforts to contribute its fair share, then project applicants shall have no further obligation to comply with this mitigation measure.

9. Seal Beach Boulevard & 2nd Street/Westminster
Boulevard: Modify the northbound approach from having one left turn lane, two through lanes, and one shared through-right turn lane, to having one left turn lane, three through lanes, and one right turn lane.

22. PCH & Seal Beach Boulevard: This intersection would require three through lanes on the northbound approach.

Prior to the
issuance of
occupancy permits
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

TRAF-5 Prior to issuance of grading permits for development projects that would be accommodated by the SEASP, project applicants/developers shall prepare a construction management plan. The construction management plan shall be approved by the City of Long Beach Public Works Department. The construction management plan shall identify construction hours, truck routes, travel patterns for haul routes, staging and parking areas, staggered worker arrival times, and safety procedures for pedestrians and cyclists. The construction management plan shall prohibit the use of heavy construction vehicles during peak hours. The plan shall also require the construction contractor to implement the following measures during construction activities, which shall be discussed at the pre-grading conference/meeting:

Minimize obstruction of through-traffic lanes and provide temporary traffic controls, such as a flag person, during all roadway improvement activities to maintain adequate access for Prior to the
issuance of
grading permits
Project
Applicant/
Developer
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

•
.
•

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 38 ends

emergency vehicles and personnel.

Develop a traffic plan to minimize interference for emergency vehicles and personnel from demolition and construction activities (e.g., advanced public notice of demolition and construction activities)
TRAF-6 Prior to issuance of the first the occupancy permits for development projects that would be accommodated by the SEASP, the City and Caltrans shall jointly identify feasible operational and physical improvements and the associated fair-share funding contribution necessary to mitigate Project-related impacts to state transportation facilities. In the event that Caltrans prepares a valid study, as defined below, that identifies fair share contribution funding sources attributable to and paid from private and public development to supplement other regional and State funding sources necessary undertake improvements to the I-22, I-605, and I-405, in the Project study area, then the project applicant shall use reasonable efforts to pay the applicable fair share amount to Caltrans.

The study shall be reviewed and approved by the California Transportation Commission. It shall include fair share contributions related to private and or public development based on nexus requirements contained in the Mitigation Fee Act (Govt. Code § 66000 et seq.) and 14 Cal. Code of Regs. § 15126.4(a)(4) and, to this end, the study shall recognize that impacts to Caltrans I-22, I-605, and I-405 facilities that are not attributable to development located within the City of Long Beach are not required to pay in excess of such developments’ fair share obligations. The fee study shall also be compliant with Government Code § 66001(g) and any other applicable provisions of law. The study shall set forth a timeline and other relevant criteria for implementation of the recommendations contained within the study to the extent the other agencies agree to participate in the fee study program.

In the event the study has been prepared, project applicants shall use reasonable efforts to pay the fair share amount to Caltrans. If Caltrans chooses to accept the project applicant’s fair share payment, Caltrans shall apply the payment to the fee program adopted by Caltrans or agreed upon by the City and Caltrans as a result of the fair share fee study. Cal
trans shall only accept the fair share payment if the fair share Prior to the
issuance of the
first occupancy
permits
City of Long
Beach
Long Beach
Development
Services and
Public Works
Departments
Long Beach
Development
Services
Department

.

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program
August 2017 Page 39
fee study has been completed. If, within five years from the date that the first building permit is issued for the Project, Caltrans has not completed the fair share fee study, then project applicants shall have no further obligation to comply with this mitigation measure

S O U T H E A S T A R E A S P E C I F I C P L A N M I T I G A T I O N M O N I T O R I N G A N D R E P O R T I N G P R O G R A M

C I T Y O F L O N G B E A C H
Mitigation Monitoring and Reporting Program

Page 40 ends