Anaheim Street
Corridor
Improvements
City Council Meeting
September 22, 2026

22 Anaheim Street from LA River to Pacific Coast Highway (4 miles)​ Project Location

33 Scope
• Complete street improvements to the Anaheim Street Corridor including Traffic Signal Upgrades, New Controlled Access Medians, Median Landscaping, ADA Improvements, Pavement Restoration, Bus Stop Improvements, and Striping.​
Project Scope & Objectives
Objective
• Address safety by prohibiting left turns at key locations where severe crashes have historically occurred​
• Upgrade traffic signal infrastructure and pavement surfacing for a more efficient and safer travel​
• Improve pedestrian accessibility and compliance with ADA requirements including replacing curb ramps, sidewalk, and driveways, as well as providing new traffic and crosswalk striping​
• Alignment with City Strategic Communications Plan (Safe Streets Long Beach, Complete Streets, Elevate ‘28)​
44 Collision Heat Map

55 Analysis
• Priority: Address
Fatal and Severe
Injuries​
• Movement
Preceding Collision​
• Pedestrian &
Bicyclist​
• 10 Years​
Collision Trends
0 1
2 3
4 5
6 7
8 9
10 CHESTNUT
LOCUST
ELM
LINDEN
LIME
OLIVE
MYRTLE
LEWIS

MAHANNA

HOFFMAN

PETERSON

GAVIOTA
ROSE

ST LOUIS
DAWSON

RAYMOND

STANLEY
MOLINO
OHIO
GLADYS

ORIZABA

FREEMAN

CORONADO

NEWPORT
LOMA
EUCLID

MIRA MAR

BELMONT

ROSWELL

BENNETT
LEE
QUINCY

ROYCROFT
PARK E

GRANADA
CLARK

COLLISIONS CORRECTABLE WITH MEDIANS

SB LT NB PED WB LT EB LT SB PED NB LT HEAD-ON
66 Traffic Signal & Controlled Access Median
Improvements
Speed Safety
System Device
Installed at
Euclid Ave.
77 Controlled Access Medians

88 Landscaping

99 Existing Condition

1010
Proposed Condition

1111
• Emergency Vehicle
Preemption/Priority​
• Roadway Resurfacing
• Rapid-Flashing Beacons​
• Expanded Bus Stops
Additional Improvements

1212
Funding Sources Include:
• CPFCDS-Grant​
• HSIP-Grant
• CRRSAA-Grant​
• Metro Prop C (Former STPL)​
• General CP​
• GAS Tax​
• Measure A Bond​
• Measure A​
• Measure M​
• Measure R​
• Prop A​
• Prop C​
• Traffic Impact Fees (TMP)​
• AB2766 AQ​
Project Cost and Funding
Approximately
$31 Million
Project Cost
1313
Project Timeline
Reconnect
with
Community
Phase 1
Completed
2023
Bid and
Award
Late spring
to late
summer
2026
Construction
Start*
Construction
End
Spring 2028LA River to Pacific
Ave and Atlantic
to Alamitos Ave.
completed
*Boots in the ground,
pre-construction
activities to start
before
1414
Sign up for project updates at:
longbeach.gov/contactPW
Stay Connected
Visit the project website at:
longbeach.gov/anaheimproject