Anaheim Street
Corridor
Improvements
City Council Meeting
September 22, 2026
22 Anaheim Street from LA River to Pacific Coast Highway (4 miles) Project Location
33 Scope
• Complete street improvements to the Anaheim Street Corridor including Traffic Signal Upgrades, New Controlled Access Medians, Median Landscaping, ADA Improvements, Pavement Restoration, Bus Stop Improvements, and Striping.
Project Scope & Objectives
Objective
• Address safety by prohibiting left turns at key locations where severe crashes have historically occurred
• Upgrade traffic signal infrastructure and pavement surfacing for a more efficient and safer travel
• Improve pedestrian accessibility and compliance with ADA requirements including replacing curb ramps, sidewalk, and driveways, as well as providing new traffic and crosswalk striping
• Alignment with City Strategic Communications Plan (Safe Streets Long Beach, Complete Streets, Elevate ‘28)
44 Collision Heat Map
55 Analysis
• Priority: Address
Fatal and Severe
Injuries
• Movement
Preceding Collision
• Pedestrian &
Bicyclist
• 10 Years
Collision Trends
0 1
2 3
4 5
6 7
8 9
10 CHESTNUT
LOCUST
ELM
LINDEN
LIME
OLIVE
MYRTLE
LEWIS
MAHANNA
HOFFMAN
PETERSON
GAVIOTA
ROSE
ST LOUIS
DAWSON
RAYMOND
STANLEY
MOLINO
OHIO
GLADYS
ORIZABA
FREEMAN
CORONADO
NEWPORT
LOMA
EUCLID
MIRA MAR
BELMONT
ROSWELL
BENNETT
LEE
QUINCY
ROYCROFT
PARK E
GRANADA
CLARK
COLLISIONS CORRECTABLE WITH MEDIANS
SB LT NB PED WB LT EB LT SB PED NB LT HEAD-ON
66 Traffic Signal & Controlled Access Median
Improvements
Speed Safety
System Device
Installed at
Euclid Ave.
77 Controlled Access Medians
88 Landscaping
99 Existing Condition
1010
Proposed Condition
1111
• Emergency Vehicle
Preemption/Priority
• Roadway Resurfacing
• Rapid-Flashing Beacons
• Expanded Bus Stops
Additional Improvements
1212
Funding Sources Include:
• CPFCDS-Grant
• HSIP-Grant
• CRRSAA-Grant
• Metro Prop C (Former STPL)
• General CP
• GAS Tax
• Measure A Bond
• Measure A
• Measure M
• Measure R
• Prop A
• Prop C
• Traffic Impact Fees (TMP)
• AB2766 AQ
Project Cost and Funding
Approximately
$31 Million
Project Cost
1313
Project Timeline
Reconnect
with
Community
Phase 1
Completed
2023
Bid and
Award
Late spring
to late
summer
2026
Construction
Start*
Construction
End
Spring 2028LA River to Pacific
Ave and Atlantic
to Alamitos Ave.
completed
*Boots in the ground,
pre-construction
activities to start
before
1414
Sign up for project updates at:
longbeach.gov/contactPW
Stay Connected
Visit the project website at:
longbeach.gov/anaheimproject
15‹#›