HARBOR SCENIC DRIVE ROADWAY AND
INFRASTRUCTURE IMPROVEMENTS
Mark Erickson, P.E.
Director, Program Management Division
City of Long Beach - Mobility Ports and Infrastructure Committee September 22, 2026
3 ECONOMIC ENGINE
CITY OF LONG BEACH
PIER E
PIER H
PIER G
PROJECT AREA LA RIVER
TOURISM
CARNIVAL CRUISES
QUEEN MARY
HARRY BRIDGES PARK
THE MAYA
MARRIOTT RESIDENCE INN
SOUTH SHORE BOAT LAUNCH
LONG BEACH AMPHITHEATER
PACIFIC CONTAINER TERMINAL
INTERNATIONAL TERMINAL SERVICES, LLC
POLB MAINTENANCE
TIDELANDS LONG BEACH ENERGY RESOURCES
CALIFORNIA ENERGY RESOURCES
LONG BEACH CONTAINER TERMINAL
INTERNATIONAL SEAFARER’S CENTER
LA COUNTY FLOOD CONTROL DISTRICT
SCE PICO SUBSTATION
INDUSTRIAL
PORT OF
LONG BEACH
QUEEN MARY
THE MAYA
PIER G CONTAINER TERMINAL
PROJECT SCOPE
Pavement Reconstruction
Optimize Traffic Flow
Redesigning Roadway for Safety
Consolidation of Ramps to Harbor Plaza
Intelligent Transportation System
Signage
Landscape
Lighting
Illustrative purposes only, not actual project signage
*not to scale
PLAN
NING
PRELIM
DESIGN DESIGN BID/
AWARD CONSTRUCTION
Start
Feb 2027
Total
Grant Funding
End
May 2028
�100.95M
SCHEDULE, BUDGET AND FUNDING
�48.30M
Project Budget
CONSTRUCTION ACCESS
Close northbound Harbor Scenic
Drive during construction
Shift southbound traffic onto
existing northbound lanes
Detour northbound to Pico Ave.
and Queensway Drive
Temporarily connect
Queensway Drive to Ocean Blvd.
STAKEHOLDER ENGAGEMENT
NEXT STEPS
AWARD CONSTRUCTION
CONTRACT
COORDINATE
DETOUR ROUTES
START
CONSTRUCTION
COMMUNITY
OUTREACH
THANK YOU
1000’ ft NORTHBOUND NB HARBOR SCENIC DR
345’ ft Eliminateddrive way
and divert traffic to
Queensway Drive
From Queensway Dr
Extended merge and
better sight distance
Extended weaving length to provide better safety
From Queens Way Bridge Ramp To Hotel and Boat Launch
Queensway Dr From Queensway Dr Turn pocket
for Reef
PROPOSED
SOUTHBOUND SB HARBOR SCENIC DR
Added split lane and exit to Queen Mary
Added a 3rd lane 1 Off Ramp To Harbor Plaza Turn Pocket to Maintenance Facility EliminatedOn-ramp from Pico Ave.
APPLICATION
SOUTHBOUND SB HARBOR SCENIC DR
Added pocket to exit to Queen Mary
To Maintenance Facility Right Turn Only 2Off Ramps To Harbor Plaza EliminatedOn-ramp from Pico Ave.
EXISTING
SOUTHBOUND Exit lane only to Queen Mary SB HARBOR SCENIC DR 2Off Ramps To Harbor Plaza On Ramp From Pico Ave. Turn Pocket to Maintenance Facility NORTHBOUND NB HARBOR SCENIC DR 425’ ft
315’ ft From Queensway Dr Weave length
Reef & Tidelands / Drive Way From Queens Way Bridge Ramp To Hotel and Boat Launch Queensway Dr
PROJECT SCOPE
470’ ft
NORTHBOUND NB HARBOR SCENIC DR
300’ ft Aux lane consecutive
Weave length merge within short distance From Queens Way Bridge Ramp
AUX LANE
Reef & Tidelands / Drive Way
To Hotel and Boat Launch
Queensway Dr
EXISTING
APPLICATION
PROPOSED
ASSESSMENT OF PROJECT BENEFITS
MODELING METHODOLOGY
Transportation Model (PortTAM)
Benefit Cost Analysis (Cal-B/C)
PROJECT BENEFIT CATEGORIES
Journey time savings and journey time reliability
Safety
Vehicle operating costs
Emissions
KEY PROJECT BENEFITS
Updated Project scope provides traffic flow efficiencies o Capacity provided by the extended weave area addresses NB traffic operational needs o Proposed auxiliary lane in TCEP application is not needed Savings and modeling does not account for wider network benefits that will result from project Emissions vehicle operating costs savings may be greater at a system level