Cities Index.
Agenda packet

Los Altos City Council
October 14, 2025

Document
Agenda packet
Meeting
October 14, 2025
Body
Los Altos City Council
Pages
658
Original file
170.1 MB
Text extracted from the city's file for reading and search. Open the original on losaltosca.api.civicclerk.com. That file is the official record.

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 41 of 100 ends

1. Constantly attended/supervised.

2. Provided with emergency shutoff valves that have ready access.

Chapter 61 LIQUEFIED PETROLEUM GASES
Section 6104.2 is amended to read as follows:
6104.2 Maximum capacity within established limits. Within The limits referred to in Section 6104.2 of the California Fire Code, in which storage of liquefied petroleum gas is restricted, are hereby established as all locations of the City of Los Altos that are residential or congested commercial areas as determined by the fire code official.

Exception: LPG may be used for industrial operations or when natural gas would not provide a viable substitute for LPG. Portable containers for temporary heating and/or cooking uses may be permitted if stored and handled in accordance with this code. Facilities in commercial areas for refueling portable or mobile LPG containers may be approved by the fire code official on a case-by-case basis.

Chapter 64 PYROPHORIC MATERIALS
Chapter 64 of the 2022 California Fire Code and 2021 International Code is amended as follows:

Section 6405 USE
Section 6405.3.1 is amended to read:
6405.3.1 Silane distribution systems automatic shutdown. Silane distribution systems shall automatically shut down at the source upon activation of the gas detection system at levels above the alarm level and/or failure of the ventilation system for the silane distribution system.

Chapter 80 REFERENCE STANDARD
NFPA
Add the following reference standard to read:
855—20: Standard for the Installation of Stationary Energy Storage Systems Appendix B FIRE-FLOW REQUIREMENTS FOR BUILDINGS
Appendix B of the 2022 California Fire Code and 2021 International Code is amended as follows:

Section B105 FIRE=FLOW REQUIRES FOR BUILDINGS
Section B105.2 is amended as follows:

B105.2 Buildings other than one- and two-family dwellings, Group R-3 and R-4 buildings and townhouses. The minimum fire-flow and flow duration for buildings other than one- and two-family dwellings, Group R-3 and R-4 buildings and townhouses shall be as specified in Tables B105.1(2) and B105.2.

Exceptions: [SFM] Group B, S-2 and U occupancies having a floor area not exceeding 1,000 square feet, primarily constructed of noncombustible exterior walls with wood or steel roof framing, having a Class A roof assembly, with uses limited to the following or similar uses:

1. California State Parks buildings of an accessory nature (restrooms).

2. Safety roadside rest areas (SRRA), public restrooms.

3. Truck inspection facilities (TIF), CHP office space and vehicle inspection bays.

4. Sand/salt storage buildings, storage of sand and salt.

Page 297 of 658 ends

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 42 of 100 ends

The maximum fire flow reduction for all commercial buildings greater than 30,000 square feet and residential podium buildings shall not exceed 25 percent of the fire flow specified in Table B105.1(2). The maximum fire flow reduction for all other buildings shall not exceed 50 percent of the fire flow specified in Table B105.1(2).

Appendix C FIRE HYDRANT LOCATIONS AND DISTRIBUTION
Appendix C of the 2022 California Fire Code and 2021 International Code is amended as follows:

Section C102 NUMBER OF FIRE HYDRANTS
Section C102.1 is amended to read:

C102.1 Minimum number of fire hydrants for a building. The number of fire hydrants available to a building shall be not less than the minimum specified in Table C102.1, utilizing the base fire flow without fire sprinkler reduction.

Appendix D FIRE APPARATUS ACCESS ROADS
Appendix D of the 2022 California Fire Code and 2021 International Code is amended as follows:

Section D103 MINIMUM SPECIFICATION
Section D103.1 is deleted:

D103.1 Access Road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet (7925 mm), exclusive of shoulders (see Figure D103.1).

Section D103.2 is amended as follows:

D103.2 Grade. The maximum grade of a fire department apparatus access road shall not exceed 15-percent, unless approved by the fire code official.

Section D103.3 is amended as follows:

D103.3 Turning radius. The required turning radius of a fire apparatus access roads shall be a minimum of 30 feet inside, and a minimum of 50 feet outside.

Section D103.4 is amended as follows:

D103.4 Dead ends. Dead-end fire apparatus access roads and/or driveways in excess of 150 feet (45 720 mm) shall be provided with width and turnaround provisions in accordance with Table D103.4 the Santa Clara County Fire Department apparatus access and turnaround standards, as approved by the fire code official.

Section D103.6 is amended as follows:

D103.6 Signs. Where required by the Fire Code Official, fire apparatus access roads shall be designated and marked as a fire lane as set forth in Section 22500.1 of the California Vehicle Code and the Santa Clara County Fire Department A-6 Standard. Signs shall have a minimum dimension of 12 inches (305 mm) wide by 18 inches (457 mm) high and have red letters on a white reflective background. Signs shall be posted on one or both sides of the fire apparatus road as required by Section D103.6.1 or D103.6.2. (Ord. No. 2013-395, § 18, 12-10-2013; Ord. No. 2016-426, § 17, 18, 11-8-2016; Ord. No. 2019-464, §§ 19, 20, 12- 10-2019; Ord. No. 2022-487, §§ 20, 21, 11-29-2022)

Page 298 of 658 ends

Title 12 - BUILDINGS AND CONSTRUCTION
Chapter 12.26 CALIFORNIA GREEN BUILDING STANDARDS CODE
Los Altos, California, Code of Ordinances Created: 2025-08-14 10:36:45 [EST] (Supp. No. 44, Update 2)

Page 43 of 100 ends

Chapter 12.26 CALIFORNIA GREEN BUILDING STANDARDS CODE9

12.26.010 Adoption of the California Green Building Standards Code.

There is hereby adopted by reference as if fully set forth herein, the 2022 California Green Building Standards Code, contained in the California Code of Regulations, Title 24, Part 11, published by the International Code Council, and each and all of its regulations and provisions. One copy is on file for use and examination by the public in the office of the building official.
(Ord. No. 2013-395, § 19, 12-10-2013; Ord. No. 2016-426, § 19, 11-8-2016; Ord. No. 2019-464, §§ 21, 22, 12-10- 2019; Ord. No. 2020-471, § 11-10-2020; Ord. No. 2022-487, §§ 22, 23, 11-29-2022)

12.26.020 Amendments, additions or deletions.

The 2022 California Green Building Standards Code referred to in Section 12.26.010 is adopted, together with Chapters 1 Administration, 4 Residential Mandatory Measures, and 5 Nonresidential Mandatory Measures, of the 2022 California Green Building Standards Code, with the following amendments as follows:

Chapter 1 Section 102.4 Scope and Mandatory Compliance is hereby added to read as follows.

Section 102.4 Scope and Mandatory Compliance
A. This code contains both mandatory and voluntary green building measures. Mandatory and voluntary measures are identified in the appropriate chapters contained in this code. Compliance measures and methods shall be by one of the following measures approved by the Building Official.

The means by which compliance measures are achieved shall be mandatory measures with appendix sections voluntarily applied, building division mandatory check list, whole house Build it Green GreenPoint check list, LEED, other recognized point systems, Title 24 Part 6 Energy Efficiency Standards, or equivalent approved methods. Green Building Compliance measures in addition to checklists shall be incorporated into the project drawings approved by the Building Official prior to building permit submittal.

Prior to issuance of a building permit, the owner or responsible Registered Design Professional acting as the owner's agent shall employ and/or retain a Qualified Green Building Professional to the satisfaction of the Building Official, and prior to final inspection shall submit verification that the project is in compliance with this ordinance.

Chapter 4 Section 4.106.4.1 Electric vehicle (EV) charging for new construction thru 4.106.4.2.2 are deleted and replaced to read as follows, based upon express findings set forth in this Ordinance.

Section 4.106.4.1 and 4.106.4.2.1 and 4.106.4.2.2 are amended to read as follows:

4.106.4.1 New one- and two-family dwellings and townhouses with attached private garages.

For each dwelling unit, install at least one Level 2 EV Ready Space in the garage. If multiple (two or more) garage parking spaces are provided for a dwelling unit, install at least two Level 2 EV Ready Spaces. 9Ord. No. 2022-487, §§ 22, adopted Nov. 29, 2022, amended Ch. 12.26 in its entirety, in effect repealing and reeancting said chapter to read as set out herein. The former Ch. 12.26, §§ 12.26.010—12.26.030, pertained to similar subject matter and derived from Ord. No. 10-359, § 19, adopted Nov. 23, 2010 and Ord. No. 2013- 395, adopted Dec. 10, 2013.

Page 299 of 658 ends

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 44 of 100 ends

4.106.4.2.1 Multifamily development projects with less than 20 dwelling units; and hotels and motels with less than 20 sleeping units or guest rooms. The number of dwelling units, sleeping units or guest rooms shall be based on all buildings on a project site subject to this section.

1. EV Capable. Twenty-five (25) percent of the total number of parking spaces on a building site, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Electrical load calculations shall demonstrate that the electrical panel service capacity and electrical system, including any on-site distribution transformer(s), have sufficient capacity to simultaneously charge all EVs at all required EV spaces at a minimum of 40 amperes.

The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as "EV CAPABLE" in accordance with the California Energy Code.

Exceptions:

1. When EV chargers (Level 2 EVSE) are installed in a number equal to or greater than the required number of EV capable spaces.

2. When EV chargers (Level 2 EVSE) are installed in a number less than the required number of EV capable spaces, the number of EV capable spaces required may be reduced by a number equal to the number of EV chargers installed.

The following requirements apply to all multifamily development projects with less than 20 dwelling units; and hotels and motels with less than 20 sleeping units or guest rooms:

1. Calculations for the required minimum number of Level 2 EVSE spaces shall be rounded up to the nearest whole number.

2. In addition, each remaining dwelling unit with parking space(s) shall be provided with at least one Level 2 EV Ready Space.

4.106.4.2.2 Multifamily development projects with 20 or more dwelling units; and hotels and motels with 20 or more sleeping units or guest rooms. The number of dwelling units, sleeping units or guest rooms shall be based on all buildings on a project site subject to this section.

2. EV Capable. Twenty-five (25) percent of the total number of parking spaces on a building site, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Electrical load calculations shall demonstrate that the electrical panel service capacity and electrical system, including any on-site distribution transformer(s), have sufficient capacity to simultaneously charge all EVs at all required EV spaces at a minimum of 40 amperes.

The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as "EV CAPABLE" in accordance with the California Energy Code.

Exceptions:

3. When EV chargers (Level 2 EVSE) are installed in a number equal to or greater than the required number of EV capable spaces.

4. When EV chargers (Level 2 EVSE) are installed in a number less than the required number of EV capable spaces, the number of EV capable spaces required may be reduced by a number equal to the number of EV chargers installed.

The following requirements apply to all multifamily development projects with 20 or more dwelling units; and hotels and motels with 20 or more sleeping units or guest rooms:

3. Calculations for the required minimum number of Level 2 EVSE spaces shall be rounded up to the nearest whole number.

Page 300 of 658 ends

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 45 of 100 ends

4. In addition, each remaining dwelling unit with parking space(s) shall be provided with at least one Level 2 EV Ready Space.

Chapter 5 Section 5.106.5.3 Electric vehicle (EV) charging thru 5.106.5.3.5 are deleted and replaced to read as follows, based upon express findings set forth in this Ordinance Section 5.106.5.3 thru 5.106.5.3.5 are amended to read as follows:

5.106.5.3 Electric vehicle (EV) charging. [N] New construction to provide electric vehicle infrastructure and facilitate electric vehicle charging shall comply with Section 5.106.5.3.1 and shall be provided in accordance with regulations in the California building Code and the California Electrical Code.

Exceptions:

1. Where there is no local utility power supply.

2. Parking spaces accessible only by automated mechanical car parking systems are not required to comply with this code section.

5.106.5.3.1 Office and Institutional buildings. In nonresidential new construction buildings designated primarily for office use and institutional buildings, with parking:

1. When 10 or more parking spaces are constructed, 50% of the available parking spaces on site shall be equipped with Level 2 EVSE;

2. An additional 20% shall be provided with at least Level 1 EV Ready Spaces; and

3. An additional 30% shall be at least Level 2 EV Capable.

Calculations for the required minimum number of spaces equipped with Level 2 EVSE, Level 1 EV Ready spaces and EV Capable spaces shall all be rounded up to the nearest whole number.

Construction plans and specifications shall demonstrate that all raceways shall be a minimum of 1" and sufficient for installation of EVSE at all required Level 1 EV Ready and EV Capable spaces; Electrical calculations shall substantiate the design of the electrical system to include the rating of equipment and any on-site distribution transformers, and have sufficient capacity to simultaneously charge EVs at all required EV spaces including Level 1 EV Ready and EV Capable spaces; and service panel or subpanel(s) shall have sufficient capacity to accommodate the required number of dedicated branch circuit(s) for the future installation of the EVSE.

5.106.5.3.2Other nonresidential buildings. In nonresidential new construction buildings that are not designated primarily for office use, such as those for retail uses:

1. When 10 or more parking spaces are constructed, 6% of the available parking spaces on site shall be equipped with Level 2 EVSE;

2. An additional 5% shall be at least Level 1 EV Ready.

Calculations for the required minimum number of spaces equipped with Level 2 EVSE and Level 1 EV Ready spaces shall be rounded up to the nearest whole number. (Ord. No. 2013-395, § 19, 12-10-2013; Ord. No. 2016-426, § 19, 11-8-2016; Ord. No. 2019-464, §§ 19, 20, 12-10- 2019; Ord. No. 2020-471, § 11-10-2020; Ord. No. 2022-487, §§ 22, 23, 11-29-2022)

12.26.030 Definitions.

For the purpose of this chapter, certain words and phrases used herein are defined as follows:
"Affordable Housing" means a housing development project, as defined in Government Code Section 65589.5(h)(2), in which at least forty (40) percent of the units within the project are required by deed, regulatory

Page 301 of 658 ends

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 46 of 100 ends

restriction contained in an agreement with a government agency, or other recorded document, to be made available at an affordable housing cost as defined in Health and Safety Code Section 50052.5, or at an affordable rent as defined in Health and Safety Code Section 50053, to persons and families of low or moderate income as defined by Section 50093 of the Health and Safety Code, lower income households as defined by Section 50079.5 of the Health and Safety Code, very low income households as defined by Section 50105 of the Health and Safety Code, or extremely low income households as defined by Section 50106 of the Health and Safety Code, for a period of fifty-five (55) years for rental housing or forty-five (45) years for owner-occupied housing. "Automatic Load Management Systems (ALMS)" means a control system which allows multiple EV chargers or EV-Ready electric vehicle outlets to share a circuit or panel and automatically reduce power at each charger, providing the opportunity to reduce electrical infrastructure costs and/or provide demand response capability.

ALMS systems must be designed to deliver at least 1.4kW to each EV Capable, EV Ready or EVCS space served by the ALMS. The connected amperage on-site shall not be lower than the required connected amperage per Part 11, 2019 California Green Building Code for the relevant building types. "Build It Green" means the Build It Green organization. Build It Green is a California professional non-profit membership organization whose mission is to promote healthy, energy and resource-efficient buildings. "Direct Current Fast Chargers" capable of charging at 20-400kW and delivers DC power directly to the battery and therefore able to charge faster. Examples of this type of charger include Superchargers and DC Fast Chargers currently used at some public and commercial sites.
"Electric Vehicle Charging Station (EVCS)" means a parking space that includes installation of electric vehicle supply equipment (EVSE) with a minimum capacity of thirty (30) amperes connected to a circuit serving a Level 2 EV Ready Space. EVCS installation may be used to satisfy a Level 2 EV Ready Space requirement. "EV Capable" means a parking space linked to a listed electrical panel with sufficient capacity to provide at least 110/120 volts and 20 amperes to the parking space. Raceways linking the electrical panel and parking space only need to be installed in spaces that will be inaccessible in the future, either trenched underground or where penetrations to walls, floors, or other partitions would otherwise be required for future installation of branch circuits. Raceways must be at least one inch in diameter and may be sized for multiple circuits as allowed by the California Electrical Code. The panel circuit directory shall identify the overcurrent protective device space(s) reserved for EV charging as "EV CAPABLE." Construction documents shall indicate future completion of raceway from the panel to the parking space, via the installed inaccessible raceways. "Green Point Rated" means the rating system developed by Build It Green. "LEED" means the "Leadership in Energy and Environmental Design" program developed by the U.S. Green Building Council. The U.S. Green Building Council is a National professional non-profit membership organization whose mission is to promote buildings that are environmentally responsible. "LEED Accredited Professional" means a person or organization determined by the Building Official to be qualified to perform inspections and provide documentation to assure compliance with the U.S. Green Building Council LEED requirements.
"Level 1 EV Ready Space" means a parking space served by a complete electric circuit with a minimum of 110/120 volt, 20-ampere capacity including electrical panel capacity, overprotection device, a minimum one inch diameter raceway that may include multiple circuits as allowed by the California Electrical Code, wiring, and either a) a receptacle labelled "Electric Vehicle Outlet" with at least a ½" font adjacent to the parking space, or b) electric vehicle supply equipment (EVSE).
"Level 2 EV Ready Space" means a parking space served by a complete electric circuit with 208/240 volt, 40- ampere capacity including electrical panel capacity, overprotection device, a minimum one inch diameter raceway that may include multiple circuits as allowed by the California Electrical Code, wiring, and either a) a receptacle labelled "Electric Vehicle Outlet" with at least a ½" font adjacent to the parking space, or b) electric vehicle supply equipment (EVSE) with a minimum output of thirty (30) amperes.

Page 302 of 658 ends

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 47 of 100 ends

"Structural Renovations" means existing portions of roof framing and/or exterior walls removed for the purpose of rebuilding and remodeling.
"Qualified Green Building Professional" means a person trained through the USGBC as a "LEED AP" (accredited professional), or through Build It Green as a GreenPoint Rater, or other qualifications when acceptable to the Building Official. A certified green building professional, architect, designer, builder, or building inspector may be considered a qualified green building professional when determined appropriate by the Building Official. (Ord. No. 2013-395, § 19, 12-10-2013; Ord. No. 2016-426, § 19, 11-8-2016; Ord. No. 2019-464, §§ 19, 20, 12-10- 2019; Ord. No. 2020-471, § 11-10-2020)
Chapter 12.28 UNIFORM HOUSING CODE
Sections:

12.28.010 Adoption of the Uniform Housing Code.

The 1998 edition of the California Building Standards Code, incorporating the Uniform Housing Code, 1997 edition, published by the International Conference of Building Officials, is hereby adopted. There is one copy of said code on file in the office of the building official for use and examination by the public. (Ord. 03-242 § 15 (part))
Chapter 12.30 CALIFORNIA EXISTING BUILDING CODE10

12.30.010 Adoption of the California Existing Building Code.

There is hereby adopted by reference as if fully set forth herein, the 2022 California Existing Building Code, contained in the California Code of Regulations, Title 24, Part 10, and also the International Existing Building Code 2021 Edition, published by the International Code Council, and each and all of its regulations and provisions. One copy is on file for use and examination by the public in the office of the building official. (Ord. No. 2013-395, § 22, 12-10-2013; Ord. No. 2016-426, § 22, 11-8-2016; Ord. No. 2019-464, §§ 23, 24, 12-10- 2019; Ord. No. 2022-487, §§ 25, 26, 11-29-2022)
Chapter 12.32 CALIFORNIA HISTORICAL BUILDING CODE11
10Editor's note(s)—Ord. No. 2013-395, adopted Dec. 10, 2013, repealed Ch. 12.30 and enacted a new chapter as set out herein. The former Ch. 12.30, § 12.30.010, pertained to similar subject matter and derived from Ord.

No. 08-319, § 16 and Ord. No. 10-359, § 22, adopted Nov. 23, 2010. 11Editor's note(s)—Ord. No. 2013-395, adopted Dec. 10, 2013, repealed Ch. 12.32 and enacted a new chapter as set out herein. The former Ch. 12.32, § 12.32.010, pertained to similar subject matter and derived from Ord.

No. 10-359, § 24, adopted Nov. 23, 2010.

Page 303 of 658 ends

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 48 of 100 ends

12.32.010 Adoption of the California Historical Building Code.

There is hereby adopted by reference as if fully set forth herein, the 2022 California Historical Building Code, contained in the California Code of Regulations, Title 24, Part 8, published by the International Code Council, is hereby adopted. There is one copy of said code on file in the office of the building official for use and examination by the public.
(Ord. No. 2013-395, § 24, 12-10-2013; Ord. No. 2016-426, § 23, 24, 11-8-2016; Ord. No. 2019-464, §§ 25, 26, 12- 10-2019; Ord. No. 2022-487, §§ 27, 28, 11-29-2022)
Chapter 12.36 WATER EFFICIENT LANDSCAPE REGULATIONS ADOPTED Sections:

12.36.010 Adoption of water efficient landscape regulations.

Water efficient landscape regulations, dated December 8, 1992, and any amendments thereto, are hereby adopted by reference, as if fully set forth herein, including each and all of the regulations, provisions, penalties, conditions, and terms thereof. A copy is available at Los Altos City Hall for use and examination. (Prior code § 9-11.01)
Chapter 12.40 UNIFORM CODE FOR THE ABATEMENT OF DANGEROUS

BUILDINGS
Sections:

12.40.010 Adoption of the Uniform Code for the Abatement of Dangerous Buildings.

The 1998 edition of the California Code of Regulations, incorporating the Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition, published by the International Conference of Building Officials, is hereby adopted. There is one copy of said code on file in the office of the city clerk for use and examination by the public. (Ord. 08-319 § 18)
Chapter 12.42 CALIFORNIA REFERENCED STANDARDS CODE12

12.42.010 Adoption of the California Referenced Standards Code.

There is hereby adopted by reference as if fully set forth herein, the 2022 California Referenced Standards Code, contained in the 2022 edition of the California Code of Regulations, Title 24, Part 12, published by the 12Editor's note(s)—Ord. No. 2013-395, adopted Dec. 10, 2013, repealed Ch. 12.42 and enacted a new chapter as set out herein. The former Ch. 12.42, § 12.42.010, pertained to similar subject matter and derived from Ord.

No. 08-319, § 19 and Ord. No. 10-359, § 26, adopted Nov. 23, 2010.

Page 304 of 658 ends

Created: 2025-08-14 10:36:45 [EST]
(Supp. No. 44, Update 2)

Page 49 of 100 ends

International Code Council, and each and all of its regulations and provisions. One copy is on file for use and examination by the public in the office of the building official. (Ord. No. 2013-395, § 26, 12-10-2013; Ord. No. 2016-426, § 25, 26, 11-8-2016; Ord. No. 2019-464, §§ 27, 28, 12- 10-2019; Ord. No. 2022-487, §§ 29, 30, 11-29-2022)
Chapter 12.44 HISTORIC PRESERVATION13
Sections:

Article 1. General Provisions

12.44.010 Purpose.

It is hereby declared as a matter of public policy that the recognition, preservation, enhancement and use of historic resources within the City of Los Altos is required in the interest of health, economic prosperity, cultural enrichment and general welfare of the people. The purpose of this chapter is to:

A. Safeguard the heritage of the city by providing for the protection of irreplaceable historic resources representing significant elements of its history;
B. Enhance the visual character of the city by encouraging the compatibility of architectural styles which reflect established architectural traditions;
C. Encourage public knowledge, understanding and appreciation of the city's past, and foster civic and neighborhood pride and sense of identity based upon the recognition and use of the city's historic resources;
D. Stabilize and improve property values within the city and increase the economic and financial benefits to the city and its inhabitants derived from the preservation, rehabilitation, and use of historic resources;
E. Integrate the conservation of historic resources into the public and private development process and identify as early as possible and resolve conflicts between the preservation of such resources and alternative land uses; and
F. Fulfill the city's responsibilities for Federal Section 106 reviews and for the California Environmental Quality Act.
(Ord. No. 2011-363, § 1, 3-8-2011)

12.44.020 Area of application.

This chapter shall apply to all historic resources listed in the historic resources inventory, historic landmarks and properties, and structures.
13Editor's note(s)—Ord. No. 2011-363, § 1, adopted March 8, 2011, amended Ch. 12.44 in its entirety to read as herein set out. The former Ch. 12.44, §§ 12.44.010—12.44.220, pertained to similar subject matter and derived from Ord. No. 04-257, § 1(part) and Ord. No. 08-324, § 2(part). Previously, said chapter derived from §§ 2-8.101, 2-8.102 and 2-8.301—2-8.504 of the prior code.

Page 305 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 50 of 100 ends

(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018)

12.44.030 Definitions.

For the purposes of this chapter, the following words and phrases shall have the meanings respectively ascribed to them in this section, unless the context or the provision clearly requires otherwise:
"Alteration" means any act or process that changes any portion of the exterior architectural appearance of a structure or object, including, but not limited to, the erection, construction, reconstruction, removal of exterior architectural features or details, or the addition of new structures, but does not include painting, ordinary maintenance and landscaping.
"California Historical Building Code" is Part 8 of Title 24 (State Building Standards Code) and applies to all qualified historic structures and sites, designated under federal, state and local authority. It provides alternative building regulations for the rehabilitation, preservation, restoration or relocation of structures designated as qualified historic buildings.
"California Office of Historic Preservation" means the governmental agency primarily responsible for the statewide administration of the historic preservation program in California. "California Register of Historical Resources" is a comprehensive listing of California's historical resources, including those of local, state and national significance. "Character defining features" means the defining elements, such as prominent architectural features, materials, craftsmanship or other elements, that, individually or in combination, identify a historic property, building or landscape.
"Commission staff" means the staff liaison assigned to the historical commission. "DPR 523" means the California Department of Parks and Recreation Historic Resource Inventory Forms used for historic evaluations. The DPR 523A form provides descriptive information about a resource. The DPR 523B form provides an evaluation of the resources and includes a determination as to whether the resource is eligible for the National or State Register of Historic Places or listing on the Los Altos Historic Resources Inventory. "Exterior architectural feature" means the architectural elements embodying style, design, general arrangement and components of all the outer surfaces of an improvement, including but not limited to, the kind, size, shape and texture of building materials, and the type and style of windows, doors, lights, signs and other fixtures appurtenant to such improvement.
"Historic landmark" means a building, improvement, structure, natural feature, site or area of land, under single or common ownership that has significant historical, architectural, cultural, and/or aesthetic interest or value, and is designated as a historic landmark by the city council. "Historic resource" is a property or structure that has been determined to be over fifty (50) years old, retains its physical integrity, has historical, architectural, cultural, and/or aesthetic value, and is listed on the historic resources inventory.
"Historic resources inventory" means the city's official inventory of the historic resources, as adopted and amended from time to time by resolution of the historical commission and/or the city council. A property or structure must be designated as a historic landmark or a historic resource in order to be listed. "Historical commission" is a seven-member advisory commission appointed by the city council that is tasked with maintaining the historic resources inventory, making recommendations on historic landmarks, working with property owners on preservation, maintenance and other development activities related to historic resources, and other activities as identified in the municipal code.

Page 306 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 51 of 100 ends

"Improvement" means any building, structure, parking facility, wall, work of art or other appurtenance or addition thereto constituting a physical betterment of real property or any part of such betterment. "Integrity" is the authenticity of the characteristics, also referred to as character defining features, from which resources derive their significance. Integrity is the composite of seven qualities: location, design, setting, materials, workmanship, feeling and association.
"Mills Act" is an economic incentive program in California for the restoration and preservation of qualified historic structures. Enacted in 1972, the Mills Act grants participating local governments the authority to enter into contracts with owners of qualified historic properties to reduce the property tax assessment in exchange for the restoration and maintenance of the historic resource.
"National Register of Historic Places" is the official inventory of districts, sites, buildings, structures and objects significant in American history, architectural, archeology and culture, maintained by the Secretary of Interior under the authority of the Historic Sites Act of 1935 and the National Historic Preservation Act of 1966. "Preservation" means the act of identification, study, protection, reconstruction, restoration, rehabilitation or enhancement of historic and/or cultural resources.
"Reconstruction" means the act or process of reproducing by new construction, the exact form and detail of a vanished building, structure or any part thereof, as it appeared at a specific period of time. "Rehabilitation" means the act or process of returning a property to a state of utility through repair or alteration that makes possible an efficient contemporary use while preserving those portions or features of the property which are significant to its historical, architectural and cultural value. "Restoration" means the act or process of accurately recovering the form and details of a property and its setting as it appeared at a particular period of time by means of the removal of later work or by the replacement of missing earlier work.
"Secretary of Interior's Standards" are the Federal Standards for the Treatment of Historic Properties that are utilized in the identification, evaluation, registration and treatment of historic properties. The list of ten (10) Rehabilitation Standards, published as the Secretary of the Interior's Standards, is aimed at retaining and preserving those features and materials that are important in defining the historic character of a resource. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Article 2. Designation of Historic Resources

12.44.040 Criteria for designation.

A structure, property or object may be eligible for designation as a historic resource or historic landmark, if it/they satisfy each of the three criteria listed below:

A. Age. A structure or property should be more than fifty (50) years in age. (Exceptions can be made to this rule if the building(s) or site(s) is/are truly remarkable for some reason - such as being associated with an outstanding architect, personage, usage or event).

B. Determination of Integrity. A structure or property should retain sufficient historic integrity in most of the following areas:

1. Design: The combination of elements that create the form, plan, space, structure and style of a property.

2. Setting: The physical environment of a historic property.

Page 307 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 52 of 100 ends

3. Materials: The physical elements that were combined or deposited during a particular period of time and in a particular pattern or configuration to form a historic property.

4. Workmanship: The physical evidence of the crafts of a particular culture or people during any given period in history or prehistory.

5. Feeling: A property's expression of the aesthetic or historic sense of a particular period of time.

C. Historic Significance. A structure or property should be clearly associated with one or more of the following areas of significance:

1. Event: Associated with a single significant event or a pattern of events that have made a significant contribution to broad patterns of local or regional history, or cultural heritage of California or the United States;

2. Person/People: Associated with the lives of persons important to the local, California or national history;

3. Architecture/Design: Embodies the distinctive characteristics of a design-type, period, region or method of construction, or represents the work of a master or possesses high artistic value; or

4. Archaeology: Yields important information about prehistory or history of the local area, California or the nation.

The city's historic resource evaluation methodology, which provides more details about the above listed criteria, is available from the planning division.
(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018)

12.44.050 Applications for designation.

A. Applications for designation as a historic landmark, or listing a historic resource on the historic resources inventory may be initiated by the owner or owners of a building, improvement, structure, natural feature, site or area of land, requesting designation of their property as a historic resource or historic landmark.

B. The city council or the planning commission may, by resolution or motion, refer a proposed designation to the historical commission. The historical commission may also consider a proposed designation upon its own initiative or by referral by the development services director.

C. Applications for designation as a historic landmark, or listing a historic resource on the historic resources inventory shall be made to the historical commission. Applications must be accompanied by such historical and architectural information as is required by the historical commission in order to make an informed recommendation concerning the request.

Applications for designation shall be acted on as set forth in sections 12.44.050, 12.44.060 and 12.44.070 of this chapter.
(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023)

12.44.060 Historic resource listing.

A. Once the application for designating a property as a historic resource and listing it on the historic resources inventory has been received, the historical commission shall consider the request at its next available scheduled meeting.

Page 308 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 53 of 100 ends

B. The commission shall conduct a public hearing to consider the proposed listing. Notice of the hearing shall be given at least ten (10) days prior to the date of the hearing by mail to the applicant, to the owner or owners of the property and to the owners of abutting properties, and by posting a notice on the property near the front property line in accordance with the standards set by commission staff.

C. The commission shall consider the proposed historic resource and determine whether or not the property satisfies the three criteria outlined in Section 12.44.040. The commission shall by motion either approve or disapprove the designation of the property as a historic resource and listing it in the historic resources inventory.

D. If the commission approves the historic resource for listing on the historic resources inventory, the listing shall become effective immediately and the designated property shall be subject to the regulations set forth in this chapter.

E. Until final action has been taken by the commission on the request to list a property, no building, alteration, grading, demolition or tree removal permit(s) shall be issued for any work to be performed upon or within the subject property, unless approved by the historical commission or the development services director.

This restriction shall become effective as of the time the application is submitted, and shall extend until the commission has taken action.

F. Within fifteen (15) days of the action taken by the historical commission, the decision may be appealed to the city council. The appeal may be filed by the applicant or any interested party. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2023-490, § 2(App. A), 3-28-2023)

12.44.070 Historic landmark designation.

A. Once the application for the proposed designation has been received, the historical commission shall consider the request at its next available scheduled meeting.

B. The commission shall conduct a public hearing to consider the proposed designation. Notice of the hearing shall be given at least ten (10) days prior to the date of the hearing by publication in at least one newspaper of general circulation within the city, by mail to the applicant, to the owner or owners of the property, and to the owners of abutting properties, and by posting a notice on the property near the front property line in accordance with the standards set by commission staff.

C. The commission shall make a recommendation to the city council on the proposed designation. In order to make a positive recommendation, the commission shall make the following findings:

1. That the proposed historic landmark satisfies the three criteria outlined in Section 12.44.040; and

2. That the proposed landmark has special historical, cultural, archeological, scientific, architectural or aesthetic interest or value as part of the heritage or history of the city, the county, the state or the nation.

D. The city council shall consider the proposed designation at its next available regular meeting and determine whether or not to accept the historical commission's recommendation. The city council shall by resolution either approve the proposed designation, in whole or in part or as modified, or shall, by motion, disapprove the proposal in its entirety.

E. If the city council approves the landmark designation, the resolution shall become effective immediately and the designated property shall be subject to the regulations set forth in this chapter and to such further restrictions or controls as may be specified in the designating resolution.

F. Adoption of a designating resolution by the city council shall be based upon the findings outlined in subsection (C) of this section.

Page 309 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 54 of 100 ends

G. Until final action has been taken by the city council on the proposed landmark, no building, alteration, grading, demolition or tree removal permit(s) shall be issued for any work to be performed upon or within the subject property, unless approved by the historical commission or the city council. This restriction shall become effective as of the time the application is submitted, and shall extend until the designating resolution becomes effective.
(Ord. No. 2011-363, § 1, 3-8-2011)

12.44.080 Notice of designation.

A. Following adoption by the city council of a resolution designating a historic landmark, the commission staff shall send notice of the designation, together with a copy of the resolution or ordinance, to the owner or owners of the designated historic landmark. The city council also shall send notice of the designation to:

1. The Santa Clara County Historical Heritage Commission; and

2. The California State Historic Preservation Officer.

B. The designating resolution or ordinance shall be recorded with the county clerk-recorder. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Editor's note(s)—Ord. No. 2017-437, § 1, adopted March 13, 2018, repealed § 12.44.080, which pertained to historic district designation, and derived from Ord. No. 2011-363, § 1, adopted March 8, 2011, and subsequently renumbered the remaining sections 12.44.090—12.44.220 as 12.44.080—12.44.210. Historical notations for former sections have been retained for reference.

12.44.090 Termination of designation.

The only legitimate reason for terminating the designation of a historic resource or historic landmark is when clear evidence is presented that shows the resource no longer meets the criteria of Section 12.44.040 due to loss of integrity and/or historic significance.
(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Editor's note(s)—Former § 12.44.100, see editor's note § 12.44.080.

Article 3. Permits

12.44.100 Applicability.

A. For historic landmark properties, a historical alteration permit (Section 12.44.150) is required in order to alter, demolish, remove, relocate or change any exterior architectural features of the designated landmark structure(s), or remove or relocate any improvements, structures or natural features that contribute to the integrity or the historic significance of the historic landmark.

B. For historic resources listed on the historic resources inventory, an advisory review (Section 12.44.140) is required in order to alter, demolish, remove, relocate or otherwise change in any manner any exterior architectural feature or natural feature that contributes to the integrity or the historic significance of a historic resource.

C. For subsection (B) of this section, the historical commission's review will take into account whether or not the proposed work adversely affects the physical integrity or the historic significance of the resource. The

Page 310 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 55 of 100 ends

historical commission's recommendation to the development services director, planning commission, or city council, shall be advisory only.

D. For non-residential properties that are historic landmarks or historic resources, non-permanent improvements such as signage, awnings and landscaping that do not adversely affect the physical integrity or the historic significance of the resource may be exempted from historical commission review by the development services director.

E. For residential properties that are historic landmarks or historic resources, improvements such as swimming pools, fences, minor accessory structures such as trellises or barbecues, and landscaping that do not adversely affect the physical integrity or the historic significance of the resource may be exempted from historical commission review by the development services director. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023) Editor's note(s)—Former § 12.44.110, see editor's note § 12.44.080.

12.44.110 Applications.

Applications for historical alteration permits or advisory review shall be submitted to the development services director. Applications shall include the following information:

A. A clear statement of the proposed work;
B. A site plan showing all existing buildings, structures, trees over six inches in diameter, property lines, easements and the proposed work;
C. Detailed plans showing both the existing and proposed exterior elevations, including a street elevation, photographs of windows and/or special features, materials and grading; D. Specifications describing all materials to be used and all processes that would affect the appearance or nature of the materials;
E. Notes indicating any deviation from the Secretary of the Interior's Standards for Historic Rehabilitation; and
F. Such other information or documents as may be requested by the development services director or the historical commission.

Applications shall be noticed as set forth in Section 12.44.120 and shall be acted on as set forth in Section

12.44.130 and 12.44.140 of this chapter.
(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023) Editor's note(s)—Former § 12.44.120, see editor's note § 12.44.080.

12.44.120 Notice of public meetings.

A. Notification shall be provided when an application for a historical alteration permit is required for a historic landmark. Applicants shall be responsible for providing notification via first class mail to the adjoining property owners, in the manner set forth by the commission staff, at least ten (10) days prior to the meeting at which the application is to be reviewed. The property owners who shall be mailed notice include, but are not limited to, the following:

1. The two adjoining property owners on each side;

2. The three adjoining rear property owners; and

Page 311 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 56 of 100 ends

3. The five adjoining front property owners across the street.

4. As deemed appropriate or necessary, the commission staff may require that notification be mailed to a greater or lesser number of property owner(s) than are identified above based on the configuration of the properties adjoining the site of the application.

5. Notice shall also be posted on the project site near the front property line in accordance with the standards set by the commission staff.

B. Notice shall be provided when an application for an advisory review is required for a historic resource.

Applicants shall be responsible for posting a notice on the project site near the front property line in accordance with the standards set by the commission staff. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Editor's note(s)—Former § 12.44.130, see editor's note § 12.44.080.

12.44.130 Advisory review.

A. For projects that require an advisory review, the historical commission shall complete its review and issue a recommendation at its next available scheduled meeting. In order to recommend approval, the commission shall find that:

1. The project complies with all provisions of this chapter; and

2. The project does not adversely affect the physical integrity or the historic significance of the subject property.

B. The historical commission recommendation shall be forwarded to the development services director, the planning commission, or the city council to be considered as part of their decision. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023) Editor's note(s)—Former § 12.44.140, see editor's note § 12.44.080.

12.44.140 Historical alteration permit.

A. For projects that require a historical alteration permit, the historical commission shall complete its review and issue a decision at its next available scheduled meeting. In order to approve a permit, the commission shall find that:

1. The project complies with all provisions of this chapter; and

2. The project does not adversely affect the physical integrity or the historic significance of the subject property.

3. The project is in compliance with the Secretary of the Interior's Standards for the Treatment of Historic Properties.

B. If the historical commission approves the historical alteration permit, or approves such permit subject to conditions, the development services director shall issue the permit in accordance with the recommendation, provided that no other approval is required under this code. In the event the historical commission recommends denial of the permit, the development services director shall notify the applicant that the requested permit will not be granted.
(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023)

Page 312 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 57 of 100 ends

Editor's note(s)—Former § 12.44.1500, see editor's note § 12.44.080.

12.44.150 Appeal.

Within fourteen (14) days of any approval or denial by the historical commission, the decision may be appealed to the city council. The appeal may be filed by the applicant or any interested party and shall be accompanied by a fee to cover the administrative cost of handling the appeal as set by city council resolution. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023) Editor's note(s)—Former § 12.44.160, see editor's note § 12.44.080.

Article 4. Miscellaneous Provisions

12.44.160 Incentives for preserving historic resources.

A. California Historical Building Code. It is the purpose of the state historical building code to provide regulations and standards for the rehabilitation, preservation, restoration (including related reconstruction) or relocation as applicable to all historical buildings, structures and properties deemed of importance to the history, architecture, or culture of an area by an appropriate local or state governmental jurisdiction. Such standards and regulations are intended to facilitate the restoration or change of occupancy so as to preserve their original or restored elements and features, to encourage energy conservation and a cost effective approach to preservation, and to provide for reasonable safety from fire, seismic forces or other hazards for occupants and users of such "buildings, structures and properties" and to provide reasonable availability and usability by the physically disabled. The state historical building code is defined in sections 18950 to 18961 of Division 13, Part 2.7 of Health and Safety Code (H&SC) Health and Safety Code, a part of California Law.

B. Economic incentives. In order to carry out more effectively and equitably the purposes of this chapter, the city council may, by resolution, adopt a program of economic (i.e., Mills Act contracts) and other incentives to support the preservation, maintenance and appropriate rehabilitation of the city's historic resources. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Editor's note(s)—Former § 12.44.170, see editor's note § 12.44.080.

12.44.170 Hardship.

Notwithstanding the criteria of this chapter, the development services director, on the recommendation of the historical commission or the planning commission or city council on appeal, may approve an application for a permit to conduct any proposed work upon or within a historic resource or historic landmark if the applicant presents clear and convincing evidence demonstrating that a disapproval of the application will cause immediate and substantial hardship on the applicant because of conditions peculiar to the person seeking to carry out the proposed work or because of conditions peculiar to the particular improvement, building, structure, topography or other feature involved. If a hardship is found to exist under this section, the historical commission or the planning commission or city council shall make a written finding to that effect, and shall specify the facts and reasons relied upon in making such finding.
(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023) Editor's note(s)—Former § 12.44.180, see editor's note § 12.44.080.

Page 313 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 58 of 100 ends

12.44.180 Fees.

A. No fee shall be charged for the filing, processing or public noticing of any application for designation.

B. The city council shall by resolution adopt a schedule of fees to be charged for any application for termination of a designation, for the filing and processing of applications for any permit required under this chapter, and for appeals pursuant to this chapter.
(Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Editor's note(s)—Former § 12.44.190, see editor's note § 12.44.080.

12.44.190 Ordinary maintenance and repair.

Nothing in this chapter shall be construed to prevent the ordinary maintenance, painting, landscaping or repair of any exterior feature in or upon any historic resource or historic landmark that does not involve a change in design, material or the external appearance thereof, nor does this chapter prevent the construction, reconstruction, alteration, restoration, demolition or removal of any historic resource or historic landmark which has been certified by the city building inspector, or fire chief, or other code enforcement officer as being in unsafe or dangerous condition which cannot be rectified through the use of the California State Historic Building Code. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Editor's note(s)—Former § 12.44.200, see editor's note § 12.44.080.

12.44.200 Duty to keep in good repair.

A. The owner, occupant or the person in actual charge of a historic resource or a historic landmark shall keep and maintain in good condition and repair all exterior portions of the improvement or structure, and all interior portions thereof whose maintenance is necessary to prevent deterioration and decay of any exterior architectural feature or natural feature.

B. It shall be the duty of the development services director or their designee to enforce this section. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018; Ord. No. 2023-490, § 2(App. A), 3-28-2023) Editor's note(s)—Former § 12.44.210, see editor's note § 12.44.080.

12.44.210 Enforcement.

The violation of any provision contained in this chapter is hereby declared to be unlawful and shall constitute a misdemeanor, subject to the penalties as prescribed in Title 1, Chapter 1.20 of this code. (Ord. No. 2011-363, § 1, 3-8-2011; Ord. No. 2017-437, § 1, 3-13-2018) Editor's note(s)—Former § 12.44.220, see editor's note § 12.44.080.

Chapter 12.48 BUILDING NUMBERS
Sections:

Page 314 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 59 of 100 ends

12.48.010 Proper number to be displayed.

Any property owner may display, and is encouraged to display, the official building number designated for such property by the naming and numbering project of the city. It shall be unlawful to display, so as to be visible from the street, any number other than the number officially designated for such property under the street naming and numbering project adopted in accordance with the provisions of the Government Code of the state. (Prior code § 9-7.01)

12.48.020 City clerk to distribute numbers.

The city clerk is hereby directed to supply any property owner with his/her official building number upon application for such number by the owner.
(Prior code § 9-7.02)
Chapter 12.52 MOVING OF BUILDINGS
Sections:

12.52.010 Definitions.

For the purposes of this chapter, certain terms used in this chapter are defined as follows:

A. "Building" shall mean a mobile home certified under the National Mobile Home Construction and Safety Standards Act of 1974 and any structure designed, built, or occupied as a shelter or roofed enclosure for persons, animals, or property and used for residential, business, mercantile, storage, commercial, industrial, institutional, assembly, educational, or recreational purposes. A building of ten (10) feet or less in width, length, and height shall not be deemed as coming under the regulations of this chapter.

B. "Building inspector" shall mean the building inspector of the city. (Prior code § 9-6.01)

12.52.020 Permits required for placement of buildings upon lots within the city.

No person shall move a building from one lot within the city onto another lot within the city or from a lot outside the city onto a lot within the city without first obtaining a permit from the council. (Prior code § 9-6.02)

12.52.030 Filing fees.

The filing fee shall be as set by the council by resolution. (Prior code § 9-6.03)

Page 315 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 60 of 100 ends

12.52.040 Hearings—Notices.

At least one public hearing shall be conducted by the planning commission and one by the council, and notice thereof shall be given in accordance with Section 14.80.030 of Chapter 14.80 of Title 14 of this code. At the public hearing any person may appear to support or object to the granting of the permit. (Prior code § 9-6.04)

12.52.050 Approval of moving.

A. The applicant shall present evidence of approval of moving by the police department, fire department, city engineer, public utility companies, and building inspector prior to setting the application for a public hearing.

No such public hearing shall be held until all approvals have been filed with the application.

B. The building inspector's report shall be based upon the following standards, and, prior to his approving the application, the following standards shall be cause for disapproval:

1. That any application requirement or any fee deposit or insurance requirement has not been complied with;

2. That the building is too large to move without endangering persons or property in the city;

3. That the building is in such a state of deterioration or disrepair or is otherwise so structurally unsafe that it could not be moved without endangering persons and property in the city;

4. That the building is structurally unsafe or unfit for the purpose for which moved if the removal location is in the city;

5. That the applicant's equipment is unsafe and that persons and property would be endangered by its use;

6. That zoning or other provisions of this code would be violated by the building in its new location; or

7. That for any other reason persons or property in the city would be endangered by the moving of the building.
(Prior code § 9-6.05)

12.52.060 Indemnification—Insurance.

A. An application for a moving permit shall be accompanied by a cash deposit or bond in the sum of four thousand dollars ($4,000.00) as an indemnity for any damage which the city may sustain by reason of damage or injury to any highway, street, alley, sidewalk, fire hydrant, or other property of the city which may be caused by or be incidental to the removal of any building over, along, or across any street in the city, and to indemnify the city against any claim of damages to persons or private property, and to satisfy any claims by private individuals arising out of, caused by, or incidental to the moving of any building over, along, or across any street in the city. The deposit shall also be used to guarantee the completion of any house moving undertaken, from the initial moving to the final setting of such building on its foundation at the destination, and in compliance with all conditions of the permit.

B. The applicant shall present evidence before the issuance of a house moving permit by the building inspector of public liability and property damage insurance in the amount of two hundred thousand dollars ($200,000.00).
(Prior code § 9-6.06)

Page 316 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 61 of 100 ends

12.52.070 Architectural and site control committee action.

Whenever a permit is applied for to move a building over a public street, and the final location or site upon which the building is to be placed is within the city, the request for the permit shall be referred to the architectural and site control committee of the planning commission to ascertain whether the structure upon its new site will be in conformity with the zoning, subdivision, or other provisions of this code which may be applicable. (Prior code § 9-6.07)

12.52.080 Responsibilities of permittees.

Every permittee under this chapter shall:

A. Move a building only over streets designated for such use in the written permit; B. Notify the building inspector, fire department, police department, and city engineer in writing of a desired change in the moving date and hours as proposed in the application; C. Notify the building inspector in writing of any and all damage done to property belonging to the city within twenty-four (24) hours after the damage or injury has occurred; D. Cause red lights to be displayed during the nighttime on every side of the building while standing or moving on a street in such manner as to warn the public of the obstruction and at all times erect and maintain barricades across the streets in such manner as to protect the public from damage or injury by reason of the removal of the building;
E. Comply with all applicable provisions of this code upon relocating the building in the city; F. Pay the expense of such police protection as may be required during the occupancy of the public property to protect the public from any damage;
G. Remove all rubbish and materials and fill all excavations to existing grade at the original building site if the site is within the city so that the premises are left in a safe and sanitary condition; and H. See that the sewer line is plugged with an approved stopper. (Prior code § 9-6.08)

12.52.090 Hearings.

A. The planning commission, at the public hearing required by Section 12.52.040 of this chapter, shall review the application, all required reports submitted pursuant to this chapter, and such evidence as may be submitted, either oral or documentary. The planning commission shall recommend to the council either the approval or disapproval of the application or may recommend the application subject to such conditions as the planning commission may prescribe.

B. When reviewing an application for other than a mobile home, the planning commission shall determine that the exterior architectural appeal and functional plan of the proposed site will be compatible with the exterior architectural appeal and functional plan of structures existing in the immediate neighborhood.

C. The planning commission, in its review of a mobile home application, shall limit its consideration to setbacks, building orientation, roof overhang, roofing material, and siding material in order to assure aesthetic compatibility with conventional standard single-family residences existing in the immediate neighborhood.

Page 317 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 62 of 100 ends

D. The council at its public hearing shall review the application and all plans, drawings, records, and other data transmitted by the planning commission. The council may sustain, modify, or reject the recommendation of the planning commission.
(Prior code § 9-6.09)

12.52.100 Clean-up work and damages—Liability.

A. The city shall proceed to do the work necessary to leaving the original premises in a safe and sanitary condition when the permittee does not comply with the requirements of this chapter, and the cost thereof shall be charged against the permittee's deposit and/or bond.

B. The permittee shall be liable for any expense, damage, or cost in excess of deposited amounts or securities, and, if not paid, the city attorney shall prosecute an action against the permittee in a court of competent jurisdiction for the recovery of such amounts which exceed the deposit. (Prior code § 9-6.10)

12.52.110 Permit required for transporting a building through the city.

A. No person shall move a building over, along, or across any street or highway within the city without first securing a permit from the building inspector. A person seeking such a permit shall file an application therefor with the building inspector. The application shall be made in writing upon forms provided by the building inspector and shall be filed in his office. The application shall set forth:

1. Evidence of public liability and property damage insurance in the amount of two hundred thousand dollars ($200,000.00);

2. The proposed moving date and hours;

3. The proposed route over which the building will travel;

4. The indemnification insurance; and

5. Such additional information as the building inspector may require.

B. The application shall be accompanied by a permit fee in the amount set by the council by resolution. (Prior code § 9-6.11)

12.52.120 Enforcement.

A. The building inspector and the police department shall enforce and carry out the requirements of this chapter.

B. The city shall proceed to do the work necessary to leave the street in a safe and sanitary condition when the permittee does not comply with the requirements of this chapter, and the cost thereof shall be charged against the deposit and/or bond of the permittee.
(Prior code § 9-6.12)
Chapter 12.56 HOUSE TRAILERS AND MOTOR COURTS
Sections:

Page 318 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 63 of 100 ends

12.56.010 Definitions.

For the purposes of this chapter, unless otherwise apparent from the context, certain words and phrases used in this chapter are defined as follows:

A. "Automobile house trailer" shall mean any unit used for living or sleeping purposes and which is equipped with wheels or similar devices used for the purpose of transporting the unit from one location to another by its own or other vehicle power.

B. "Motor court" shall mean any premises used, or held out for use to the public, as a place where one or more persons may rent or lease sleeping and/or eating accommodations, or accommodations for house trailers, for a transient period and shall include auto camps, auto courts, motel courts, trailer camps, and any other similar accommodation used by the traveling public, other than a duly approved hotel in the business section of the city.
(Prior code § 5-9.01)

12.56.020 Placing of automobile house trailers.

A. It shall be unlawful for any person to place, keep, or maintain any automobile house trailer on any land within the city without the express written permission of the owner of such land. No person shall allow, suffer, or permit any trailer to be placed, kept, or maintained on any land owned or controlled by him; provided, however, the occupant of any single-family dwelling may permit not more than one automobile house trailer of a non-paying guest to be placed, kept, or maintained on the premises of such dwelling for a total of not more than thirty (30) days in each calendar year by complying with all of the applicable ordinances of the city and securing a permit from the county health department.

B. Nothing in this chapter shall be deemed to prohibit the storage of an automobile house trailer on the home premises of its owner when located to the rear of the front setback line of the property, or in the case of a corner lot, when located five feet to the rear of any front setback line of any street, and not nearer than ten (10) feet from the sideline of any adjoining property, or twenty-five (25) feet from any public thoroughfare, dedicated or otherwise, in the case of a corner lot, and so long as said automobile house trailer is not used for living or sleeping purposes. Nothing, however, in this chapter shall conflict with Title 14 of this code with regard to side yard setback for any building site shown as one entire lot of record in the office of the Santa Clara County recorder prior to December 1, 1952.

C. Upon written application to the office of the building inspector, a variance from the requirements of this chapter may be given on a yearly permit basis for the storage of an unoccupied automobile house trailer at least five feet to the rear of the front or secondary setback line but closer than ten (10) feet from the side property line when the planning commission, after thorough investigation, has determined:

1. That it would involve an economic hardship to comply with the provisions of this chapter in the storage of an automobile house trailer because of existing buildings or landscaping;

2. That said variance from the provisions of this chapter will not be harmful to the surrounding neighborhood in appearance, and that it will be properly screened so as not to detract from orderly community planning and development; and

3. That there has been no substantial objection made by the surrounding and adjacent property owners within three hundred (300) feet from the property on which the variance is to be granted after posted notice that a hearing will be held upon the application for the variance from the provisions of this chapter, or by such other method of notice of hearing as the planning commission may prescribe. (Prior code § 5-9.02)

Page 319 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 64 of 100 ends

12.56.030 Permit for motor court or trailer camp required.

No person shall operate, locate or construct any motor court or trailer camp without first having obtained a permit therefor from the building inspector.
(Prior code § 5-9.03)

12.56.040 Issuance of permit.

The building inspector shall not issue a permit under this chapter until the location of and arrangement of the proposed automobile trailer or motor court or trailer camp shall have been approved by the planning commission of the city, and until the approval of the county health department has been obtained as to sanitation and public health.
(Prior code § 5-9.04)

12.56.050 Parking of trailers on streets.

It shall be unlawful to park an automobile trailer upon any public street or alley within the city for a period of more than thirty (30) minutes during the period of 7:00 p.m. of one day to 7:00 a.m. of the following day. (Prior code § 5-9.05)
Chapter 12.60 FLOODPLAIN MANAGEMENT14
Article 1. General Provisions

12.60.010 Title.

These regulations, in combination with the flood provisions of California Code of Regulations Title 24, the California Building Standards Code (hereinafter "building codes," consisting of the Part 2 (building), Part 2.5 (residential), Part 10 (existing building), and related codes), shall be known as the Floodplain Management Regulations of the City of Los Altos (hereinafter "these regulations"). (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.020 Statutory authority.

Legislature of the State of California has, in Government Code Sections 65302, 65560, and 65800, conferred upon local governments the authority to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry.
14Ord. No. 2021-480, § 2, adopted Sep. 14, 2021, amended Ch. 12.60 in its entirety to read as set out herein.

Former Ch. 12.60, §§ 12.60.010—12.60.230 pertained to similar subject matter and derived from Prior code §§ 10-6.101—10-6.103, 10-6.201, 10-6.301—10-6.306, 10-6.401—10-6.403, 10-6.501—10-6.508, 10-6.601, 10-6.602, Ord. No. 09-335, § 1, adopted March 24, 2009, and Ord. No. 2021-479, § 2, adopted Aug. 24, 2021.

Page 320 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 65 of 100 ends

(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.030 Scope.

The provisions of these regulations, in combination with the flood provisions of the building codes, shall apply to all proposed development entirely or partially in flood hazard areas established in Section 12.60.110 of these regulations.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.040 Purposes and objectives.

The purposes and objectives of these regulations and the flood load and flood resistant construction requirements of the building codes are to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific flood hazard areas through the establishment of comprehensive regulations for management of flood hazard areas, designed to:

A. Minimize unnecessary disruption of commerce, access and public service during times of flooding.

B. Require the use of appropriate construction practices in order to prevent or minimize future flood damage.

C. Manage the alteration of natural floodplains, stream channels and shorelines to minimize the impact of development on the natural and beneficial functions of the floodplain.

D. Manage filling, grading, dredging, mining, paving, excavation, drilling operations, storage of equipment or materials, and other development which may increase flood damage or erosion potential.

E. Prevent or regulate the construction of flood barriers which will divert floodwater or increase flood hazards.

F. Contribute to improved construction techniques in the floodplain.

G. Minimize damage to public and private facilities and utilities.

H. Help maintain a stable tax base by providing for the sound use and development of flood hazard areas.

I. Minimize the need for rescue and relief efforts associated with flooding.

J. Ensure that property owners, occupants, and potential owners are aware of property located in flood hazard areas.

K. Minimize the need for future expenditure of public funds for flood control projects and response to and recovery from flood events.

L. Meet the requirements of the National Flood Insurance Program for community participation as set forth in Title 44 Code of Federal Regulations, Section 59.22. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.050 Coordination with California Building Standards Code.

Pursuant to the requirement established in State statute that the City of Los Altos administer and enforce the California Building Standards Code, the city council of the City of Los Altos hereby acknowledges that the building codes contain certain provisions that apply to the design and construction of buildings and structures in flood

Page 321 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 66 of 100 ends

hazard areas. Therefore, these Regulations are intended to be administered and enforced in conjunction with the building codes.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.060 Warning.

The degree of flood protection required by these regulations and the building codes is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur.

Flood heights may be increased by man-made or natural causes. Enforcement of these Regulations and the building codes does not imply that land outside the special flood hazard areas, or that uses permitted within such flood hazard areas, will be free from flooding or flood damage. The flood hazard areas and base flood elevations contained in the Flood Insurance Study and shown on Flood Insurance Rate Maps and the requirements of Title 44 Code of Federal Regulations, Sections 59 and 60 may be revised by the Federal Emergency Management Agency, requiring this community to revise these Regulations to remain eligible for participation in the National Flood Insurance Program. No guaranty of vested use, existing use, or future use is implied or expressed by compliance with these regulations.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.070 Disclaimer of liability.

These regulations shall not create liability on the part of the City of Los Altos, the city council, any officer or employee thereof, the State of California, or the Federal Emergency Management Agency, for any flood damage that results from reliance on these regulations or any administrative decision lawfully made hereunder. The floodplain administrator and any employee charged with the enforcement of these regulations, while acting for the community in good faith and without malice in the discharge of the duties required by these regulations or other pertinent law or ordinance, shall not thereby be rendered liable personally and is hereby relieved from personal liability for any damage accruing to persons or property as a result of any act or by reason of an act or omission in the discharge of official duties. Any suit instituted against an officer or employee because of an act performed by that officer or employee in the lawful discharge of duties and under the provisions of these regulations shall be defended by a legal representative of the community until the final termination of the proceedings. The floodplain administrator and any subordinate shall not be liable for cost in any action, suit or proceeding that is instituted in pursuance of the provisions of these regulations. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.080 Other laws.

The provisions of these regulations shall not be deemed to nullify any provisions of local, state or federal law. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.090 Abrogation and greater restrictions.

These regulations supersede any ordinance in effect in flood hazard areas. However, these regulations are not intended to repeal, abrogate or impair any existing ordinances including land development regulations, subdivision regulations, zoning ordinances, stormwater management regulations, or building codes, nor any existing easements, covenants, or deed restrictions. In the event of an overlap or conflict between these

Page 322 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 67 of 100 ends

regulations and any other ordinance, code, regulation, easement, covenant, or deed restriction, the more restrictive shall govern.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 2. Applicability

12.60.100 General applicability.

These regulations, in conjunction with the building codes, provide minimum requirements for development located in flood hazard areas, including the subdivision of land; filling, grading and other site improvements; installation of utilities; installation, placement and replacement of manufactured homes; placement of recreational vehicles; installation of tanks; temporary structures and temporary or permanent storage; utility and miscellaneous Group U buildings and structures; certain building work exempt from permit under the building codes; and flood control projects.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.110 Establishment of flood hazard areas.

The flood insurance study for the City of Los Altos, Santa Clara County, California and Incorporated Areas dated January 1980, and all subsequent amendments and revisions, and the accompanying flood insurance rate maps (FIRM), and all subsequent amendments and revisions to such maps, are hereby adopted by reference as a part of these Regulations and serve as the basis for establishing flood hazard areas. Where the building code establishes flood hazard areas, such areas are established by this section. Additional maps and studies, when specifically adopted, supplement the FIS and FIRMs to establish additional flood hazard areas. Maps and studies that establish flood hazard areas are on file at the Community Development Department, One North San Antonio Road, Los Altos, CA 94022.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.120 Interpretation.

In the interpretation and application of these regulations, all provisions shall be:

A. Considered as minimum requirements.

B. Liberally construed in favor of the governing body.

C. Deemed neither to limit nor repeal any other powers granted under state statutes. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 3. Duties and Powers of The Floodplain Administrator

12.60.130 Designation.

The Community Development Director, or his or her designee, is designated the floodplain administrator.

The floodplain administrator shall have the authority to delegate performance of certain duties to other employees.

Page 323 of 658 ends

Created: 2025-08-14 10:36:46 [EST]
(Supp. No. 44, Update 2)

Page 68 of 100 ends

(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.140 General authority.

The floodplain administrator is authorized and directed to administer and enforce these regulations. the floodplain administrator shall have the authority to render interpretations of these regulations and to establish policies and procedures in order to clarify the application of its provisions. Such interpretations, policies and procedures shall be consistent with the intent and purpose of these regulations and the flood provisions of the building code and shall not have the effect of waiving specific requirements without the granting of a variance pursuant to Article 7 of these regulations. The floodplain administrator is authorized to waive the submission of site plans, construction documents, and other data that are required by these regulations but that are not required to be prepared by a qualified California (CA) Licensed Land Surveyor or Civil Engineer when it is found that the nature of the proposed development is such that the review of such submissions is not necessary to ascertain compliance with these regulations.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.150 Coordination.

The floodplain administrator shall coordinate with and provide comments to the building official to administer and enforce the flood provisions of the building code and to ensure compliance with the applicable provisions of these regulations. The floodplain administrator and the building official have the authority to establish written procedures for reviewing applications and conducting inspections for buildings and for administering and documenting determinations of substantial improvement and substantial damage made pursuant to Section 12.60.170 of these regulations.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.160 Duties.

The floodplain administrator, in coordination with other pertinent offices of the community, shall:

A. Review all permit applications and plans to determine whether proposed development is located in flood hazard areas.

B. Review all applications and plans for development in flood hazard areas for compliance with these regulations.

C. Review, in coordination with the building official, required design certifications and documentation of elevations specified by the building code to determine that such certifications and documentations are complete.

D. Review applications and plans for modification of any existing development in flood hazard areas for compliance with these regulations.

E. Require development in flood hazard areas to be reasonably safe from flooding and to be designed and constructed with methods, practices and materials that minimize flood damage.

F. Interpret flood hazard area boundaries and provide available flood elevation and flood hazard information.

G. Determine whether additional flood hazard data shall be obtained from other sources or developed by the applicant.

Page 324 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 69 of 100 ends

H. Complete the appropriate section of the Department of Housing and Community Development Floodplain Ordinance Compliance Certification for Manufactured Home/Mobile home Installations when submitted by applicants.

I. Review requests submitted to the building official seeking approval to modify the strict application of the flood load and flood resistant construction requirements of the building code, to determine whether such requests require consideration as a variance pursuant to Article 7 of these regulations.

J. Coordinate with the building official and others to identify and investigate damaged buildings located in flood hazard areas and inform owners of the requirement to obtain permits for repairs.

K. Require applicants who submit hydrologic and hydraulic engineering analyses to support permit applications to submit to FEMA the data and information necessary to maintain the flood insurance rate maps when the analyses indicate changes in base flood elevations, flood hazard area boundaries, or floodway designations; such submissions shall be made within six months of such data becoming available.

L. Require applicants who propose alteration of a watercourse to notify adjacent communities and the NFIP State Coordinating Agency, and to submit copies of such notifications to the Federal Emergency Management Agency (FEMA).

M. Inspect development in accordance with Article 6 of these regulations and inspect flood hazard areas to determine when development is undertaken without issuance of permits.

N. Prepare comments and recommendations for consideration when applicants seek variances for development other than buildings in accordance with Article 7 of these regulations.

O. Cite violations in accordance with Article 8 of these regulations.

P. Notify FEMA when the corporate boundaries of the City of Los Altos have been modified and provide a map and legal description of the changes in the corporate boundaries. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.170 Substantial improvement and substantial damage determinations.

For applications for building permits to improve buildings and structures, including alterations, movement, enlargement, replacement, repair, additions, rehabilitations, renovations, substantial improvements, repairs of substantial damage, and any other improvement of or work on such buildings and structures, the floodplain administrator, in coordination with the building official, shall:

A. Estimate the market value, or require the applicant to obtain an appraisal of the market value prepared by a qualified independent appraiser, of the building or structure before the start of construction of the proposed work; in the case of repair, the market value of the building or structure shall be the market value before the damage occurred and before any repairs are made.

B. Compare the cost to perform the improvement, the cost to repair the damaged building to its predamaged condition, or the combined costs of improvements and repairs, when applicable, to the market value of the building or structure.

C. Determine and document whether the proposed work constitutes substantial improvement or repair of substantial damage.

D. Notify the applicant when it is determined that the work constitutes substantial improvement or repair of substantial damage and that compliance with the flood resistant construction requirements of the building code is required and notify the applicant when it is determined that work does not constitute substantial improvement or repair of substantial damage.

Page 325 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 70 of 100 ends

(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.180 Department records.

In addition to the requirements of the building code and these regulations, and regardless of any limitation on the period required for retention of public records, the floodplain administrator shall maintain and permanently keep and make available for public inspection all records that are necessary for the administration of these regulations and the flood provisions of the building codes, including flood insurance studies and flood insurance rate maps; documents from FEMA that amend or revise FIRMs; records of issuance of permits and denial of permits; determinations of whether proposed work constitutes substantial improvement or repair of substantial damage; required certifications and documentation specified by the building codes and these regulations; notifications to adjacent communities, FEMA, and the State related to alterations of watercourses; assurance that the flood carrying capacity of altered waterways will be maintained; documentation related to variances, including justification for issuance or denial; and records of enforcement actions taken pursuant to these regulations and the flood resistant provisions of the building codes.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 4. Permits for Floodplain Development

12.60.190 Permits required.

Any person, owner or authorized agent who intends to conduct any development in a flood hazard area shall first make application to the floodplain administrator and shall obtain the required permit for floodplain development. No permit shall be issued until compliance with the requirements of these regulations and all other applicable codes and regulations has been satisfied. No building permit shall be issued based on conditional letters of map revision issued by FEMA. Depending on the nature and extent of proposed development that includes a building or structure, the floodplain administrator may determine a permit for floodplain development is required in addition to a building permit.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.200 Application for permit.

The applicant shall file an application in writing on a form furnished by the floodplain administrator. The information provided shall:

A. Identify and describe the development to be covered by the permit.

B. Describe the land on which the proposed development is to be conducted by legal description, street address or similar description that will readily identify and definitely locate the site.

C. Indicate the use and occupancy for which the proposed development is intended.

D. Be accompanied by a site plan and construction documents as specified in Article 5 of these regulations, including grading, excavation and filling plans and other information deemed appropriate by the floodplain administrator.

E. State the valuation of the proposed work.

F. Be signed by the applicant or the applicant's authorized agent.

Page 326 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 71 of 100 ends

G. Include such other data and information required by the floodplain administrator to demonstrate compliance with these Regulations.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.210 Validity of permit.

The issuance of a permit for floodplain development under these regulations or the building codes shall not be construed to be a permit for, or approval of, any violation of these regulations, the building code, or any other ordinance of the community. The issuance of a permit for floodplain development based on submitted documents and information shall not prevent the floodplain administrator from requiring the correction of errors and omissions. The floodplain administrator is authorized to prevent occupancy or use of a structure or site which is in violation of these regulations.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.220 Other permits required.

The applicant shall obtain all other required state and federal permits prior to initiating work authorized by these regulations and shall provide documentation of such permits to the floodplain administrator. Such permits include but are not limited to the California State Water Resources Control Board for activities that affect wetlands and alter surface water flows, in conjunction with the U.S. Army Corps of Engineers; Section 404 of the Clean Water Act.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.230 Expiration.

A permit for floodplain development shall become invalid when the proposed development is not commenced within one hundred eighty (180) days after its issuance, or when the work authorized is suspended or abandoned for a period of one hundred eighty (180) days after the work commences. Extensions shall be requested in writing and justifiable cause demonstrated. The floodplain administrator is authorized to grant, in writing, one or more extensions of time, for periods not more than one hundred eighty (180) days each unless FEMA has issued notification of revision to the flood insurance rate study and flood insurance rate maps that alter the flood hazard area or floodway boundaries, flood zones, or base flood elevations, in which case the permit is invalid.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.240 Suspension or revocation.

The floodplain administrator is authorized to suspend or revoke a permit for floodplain development issued under these regulations wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of these regulations or any ordinance or code of this community. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 327 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 72 of 100 ends

12.60.250 Appeals of decisions.

When it is alleged there is an error in any decision or determination made by the floodplain administrator in the interpretation or enforcement of these regulations, such decision or determination may be appealed to the city manager by filing a written appeal setting forth the reasons of the appeal. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 5. Site Plans and Construction Documents

12.60.260 Information for development in flood hazard areas.

The site plan or construction documents for any development subject to the requirements of these regulations shall be drawn to scale and shall include, as applicable to the proposed development:

A. Delineation of flood hazard areas; floodway boundaries and flood zone(s); base flood elevation(s); ground elevations; proposed filling, grading, and excavation; and drainage patterns and facilities when necessary for review of the proposed development.

B. Where base flood elevations or floodway data are not included on the FIRM or in the flood insurance study, they shall be established in accordance with Section 12.60.270 or Section 12.60.280 of these regulations.

C. Where the parcel on which the proposed development will take place will have more than fifty (50) lots or is larger than five acres and base flood elevations are not included on the FIRM or in the flood insurance study, such elevations shall be established in accordance with Section 12.60.270.B of these regulations.

D. Location of the proposed activity and proposed structures; locations of water supply, sanitary sewer, and other utilities; and locations of existing buildings and structures.

E. Location, extent, amount, and proposed final grades of any filling, grading, or excavation.

F. Where the placement of fill is proposed, the amount, type, and source of fill material; compaction specifications; a description of the intended purpose of the fill areas; and evidence that the proposed fill areas are the minimum necessary to achieve the intended purpose.

G. Existing and proposed alignment of any proposed alteration of a watercourse. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.270 Information in flood hazard areas without base flood elevations (approximate Zone A).

Where flood hazard areas are delineated on the FIRM and base flood elevation data have not been provided, the floodplain administrator is authorized to:

A. Require the applicant to include base flood elevation data prepared by a qualified CA Licensed Civil Engineer in accordance with currently accepted engineering practices. Such analyses shall be performed and sealed by a qualified CA Licensed Civil Engineer. Studies, analyses and computations shall be submitted in sufficient detail to allow review and approval by the floodplain administrator. The accuracy of data submitted for such determination shall be the responsibility of the applicant.

Page 328 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 73 of 100 ends

B. Obtain, review, and provide to applicants base flood elevation and floodway data available from a federal or state agency or other source or require the applicant to obtain and use base flood elevation and floodway data available from a federal or state agency or other source.

C. Where base flood elevation and floodway data are not available from another source, where the available data are deemed by the floodplain administrator to not reasonably reflect flooding conditions, or where the available data are known to be scientifically or technically incorrect or otherwise inadequate:

1. Require the applicant to include base flood elevation data in accordance with Section

12.60.270.A of these regulations; or

2. Specify that the base flood elevation is two feet above the highest adjacent grade at the location of the development, provided there is no evidence indicating flood depths have been or may be greater than two feet.

D. Where the base flood elevation data are to be used to support a request for a letter of map change from FEMA, advise the applicant that the analyses shall be prepared by a qualified CA Licensed Civil Engineer in a format required by FEMA, and that it shall be the responsibility of the applicant to satisfy the submittal requirements and pay the processing fees. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.280 Additional analyses and certifications.

As applicable to the location and nature of the proposed development activity, and in addition to the requirements of these Regulations, the applicant shall have the following analyses signed and sealed by a qualified CA Licensed Civil Engineer for submission with the site plan and construction documents:

A. For development activities proposed to be located in a floodway, a floodway encroachment analysis that demonstrates that the encroachment of the proposed development will not cause any increase in base flood elevations; where the applicant proposes to undertake development activities that do increase base flood elevations, the applicant shall submit such analysis to FEMA as specified in Section

12.60.290 of these regulations and shall submit the conditional letter of map revision, when issued by FEMA, with the site plan and construction documents.

B. For development activities proposed to be located in a riverine flood hazard area where base flood elevations are included in the flood insurance study or on the FIRM but floodways have not been designated, hydrologic and hydraulic analyses that demonstrate that the cumulative effect of the proposed development, when combined with all other existing and anticipated flood hazard area encroachments, will not increase the base flood elevation more than one foot at any point within the community. This requirement does not apply in isolated flood hazard areas not connected to a riverine flood hazard area or in flood hazard areas identified as Zone AO or Zone AH.

C. For alteration of a watercourse, an engineering analysis prepared in accordance with standard engineering practices that demonstrates the flood-carrying capacity of the altered or relocated portion of the watercourse will not be decreased, and certification that the altered watercourse shall be maintained in a manner which preserves the channel's flood-carrying capacity. The applicant shall submit the analysis to FEMA as specified in Section 12.60.290 of these regulations. The applicant shall notify the chief executive officer of adjacent communities and the California Department of Water Resources. The floodplain administrator shall maintain a copy of the notification in the permit records and shall submit a copy to FEMA.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 329 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 74 of 100 ends

12.60.290 Submission of additional data.

When additional hydrologic, hydraulic or other engineering data, studies, and additional analyses are submitted to support an application, the applicant has the right to seek a letter of map change from FEMA to change the base flood elevations, change floodway boundaries, or change boundaries of flood hazard areas shown on FIRMs, and to submit such data to FEMA for such purposes. The analyses shall be prepared by a qualified CA Licensed Civil Engineer in a format required by FEMA. Submittal requirements and processing fees shall be the responsibility of the applicant. Provided FEMA issues a conditional letter of map revision, construction of proposed flood control projects and land preparation for development are permitted, including clearing, excavation, grading, and filling. Permits for construction of buildings shall not be issued until the applicant satisfies the FEMA requirements for issuance of a letter of map revision.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 6. Inspections

12.60.300 Inspections, in general.

Development for which a permit for floodplain development is required shall be subject to inspection.

Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of these regulations or the building code. Inspections presuming to give authority to violate or cancel the provisions of these regulations or the building code or other ordinances shall not be valid. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.310 Inspections of development other than buildings and structures.

The floodplain administrator shall make or cause to be made, inspections of all development other than buildings and structures that is authorized by issuance of a permit for floodplain development under these regulations. The floodplain administrator shall inspect flood hazard areas from time to time to determine when development is undertaken without issuance of a permit. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.320 Inspections of manufactured homes installations.

The floodplain administrator shall make or cause to be made, inspections of installation and replacement of manufactured homes in flood hazard areas authorized by issuance of a permit for floodplain development under these regulations. Upon installation of a manufactured home and receipt of the elevation certification required in Section 12.60.580 of these regulations the floodplain administrator shall inspect the installation or have the installation inspected.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.330 Buildings and structures.

The building official shall make or cause to be made, inspections for buildings and structures in flood hazard areas authorized by permit, in accordance with the building code:

Page 330 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 75 of 100 ends

A. Lowest floor elevation. Upon placement of the lowest floor, including the basement, and prior to further vertical construction, certification of the elevation required in the building code shall be prepared by a CA Licensed Land Surveyor or Civil Engineer and submitted to the building official.

B. Final inspection. Prior to the final inspection, certification of the elevation required in the building code shall be prepared by a CA Licensed Land Surveyor or Civil Engineer and submitted to the building official.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 7. Variances

12.60.340 Nature of variances.

The considerations and conditions for variances set forth in this article are based on the general principle of zoning law that variances pertain to a piece of property and are not personal in nature. A variance may be issued for a parcel of property with physical characteristics so unusual that complying with the requirements of these regulations would create an exceptional hardship to the applicant or the surrounding property owners. The characteristics must be unique to the property and not be shared by adjacent parcels. The unique characteristic must pertain to the land itself, not to the structure, its inhabitants, or the property owners. The issuance of a variance is for floodplain management purposes only. Federal flood insurance premium rates are determined by the National Flood Insurance Program according to actuarial risk and will not be modified by the granting of a variance.

It is the duty of the City of Los Altos to promote public health, safety and welfare and minimize losses from flooding. This duty is so compelling and the implications of property damage and the cost of insuring a structure built below flood level are so serious that variances from the elevation or other requirements in the building codes should be quite rare. The long term goal of preventing and reducing flood loss and damage, and minimizing recovery costs, inconvenience, danger, and suffering, can only be met when variances are strictly limited.

Therefore, the variance requirements in these regulations are detailed and contain multiple provisions that must be met before a variance can be properly issued. The criteria are designed to screen out those situations in which alternatives other than a variance are more appropriate. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.350 Variances; general.

The city manager shall hear and decide requests for variances from the strict application of these regulations. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.360 Limitations on authority.

The city manager shall base its determination on technical justifications submitted by applicants, the considerations and conditions set forth in this article, the comments and recommendations of the floodplain administrator and building official, as applicable, and has the right to attach such conditions to variances as it deems necessary to further the purposes and objectives of these regulations and the building code. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 331 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 76 of 100 ends

12.60.370 Records.

The floodplain administrator shall maintain a permanent record of all variance actions, including justification for issuance.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.380 Historic structures.

A variance is authorized to be issued for the repair, improvement, or rehabilitation of a historic structure upon a determination that the proposed repair, improvement, or rehabilitation will not preclude the structure's continued designation as a historic structure, and the variance is the minimum necessary to preserve the historic character and design of the structure. When the proposed work precludes the structure's continued designation as a historic building, a variance shall not be granted and the structure and any repair, improvement, and rehabilitation shall be subject to the requirements of the building code. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.390 Restrictions in floodways.

A variance shall not be issued for any proposed development in a floodway when any increase in flood levels would result during the base flood discharge, as evidenced by the applicable analyses required in Section

12.60.280.A of these regulations.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.400 Functionally dependent uses.

A variance is authorized to be issued for the construction or substantial improvement necessary for the conduct of a functionally dependent use provided the criteria in Section 1612 of the building code (CCR Title 24 Part 2) or Section R322 of the residential code (CCR Title 24 Part 2.5) are met, as applicable, and the variance is the minimum necessary to allow the construction or substantial improvement, and that all due consideration has been given to use of methods and materials that minimize flood damages during the base flood and create no additional threats to public safety.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.410 Considerations for issuance of variances.

In reviewing applications for variances, all technical evaluations, all relevant factors, all other requirements of these Regulations and the building code, as applicable, and the following shall be considered:

A. The danger that materials and debris may be swept onto other lands resulting in further injury or damage.

B. The danger to life and property due to flooding or erosion damage.

C. The susceptibility of the proposed development, including contents, to flood damage and the effect of such damage on current and future owners.

D. The importance of the services provided by the proposed development to the community.

Page 332 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 77 of 100 ends

E. The availability of alternate locations for the proposed development that are not subject to flooding or erosion and the necessity of a waterfront location, where applicable.

F. The compatibility of the proposed development with existing and anticipated development.

G. The relationship of the proposed development to the comprehensive plan and floodplain management program for that area.

H. The safety of access to the property in times of flood for ordinary and emergency vehicles.

I. The expected heights, velocity, duration, rate of rise and debris and sediment transport of the floodwater and the effects of wave action, if applicable, expected at the site.

J. The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, streets and bridges.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.420 Conditions for issuance of variances.

Variances shall only be issued upon:

A. Submission by the applicant of a showing of good and sufficient cause that the unique characteristics of the size, configuration or topography of the site limit compliance with any provision of these regulations or renders the elevation standards of the building code inappropriate.

B. A determination that failure to grant the variance would result in exceptional hardship due to the physical characteristics of the land that render the lot undevelopable.

C. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, nor create nuisances, cause fraud on or victimization of the public or future property owners, or conflict with existing local laws or ordinances.

D. A determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.

E. When the request is to allow construction of the lowest floor of a new building or substantial improvement of a building below the base flood elevation, notification to the applicant in writing over the signature of the floodplain administrator specifying the difference between the base flood elevation and the proposed elevation of the lowest floor, stating that issuance of a variance to construct below the elevation required in the building code will result in increased premium rates for federal flood insurance up to amounts as high as twenty-five dollars ($25.00) for one hundred dollars ($100.00) of insurance coverage, and that such construction below the required elevation increases risks to life and property.

F. Written agreement signed by the recipient of a variance to allow construction of the lowest floor below the required elevation to record the variance in the Office of the Santa Clara County Recorder in a manner so that it appears in the chain of title of the property. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 8. Violations

Page 333 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 78 of 100 ends

12.60.430 Violations.

Any development in any flood hazard area that is being performed without an issued permit or that is in conflict with an issued permit shall be deemed a violation. A building or structure without the documentation of the elevation of the lowest floor, other required design certifications, or other evidence of compliance required by these regulations or the building code, is presumed to be a violation until such time as required documentation is submitted. Violation of the requirements shall constitute a misdemeanor. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.440 Authority.

The floodplain administrator is authorized to serve notices of violation or stop work orders to owners of property involved, to the owner's agent, or to the person or persons doing the work for development that is not within the scope of the building codes, but is regulated by these regulations and that is determined to be a violation.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.450 Unlawful continuance.

Any person who shall continue any work after having been served with a notice of violation or a stop work order, except such work as that person is directed to perform to remove or remedy a violation or unsafe condition, shall be subject to penalties as prescribed by law.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 9. Definitions

12.60.460 General.

The following words and terms shall, for the purposes of these regulations, have the meanings shown herein.

Where terms are not defined in these regulations and are defined in the building code (CCR Title 24 Part 2) and used in the residential code (CCR Title 24 Part 2.5), such terms shall have the meanings ascribed to them in those codes. Where terms are not defined in these Regulations or the building code, such terms shall have ordinarily accepted meanings such as the context implies.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.470 Definitions.
"Accessory structure" means a structure on the same parcel of property as a principal structure and the use of which is incidental to the use of the principal structure. For floodplain management purposes, the term includes only accessory structures used for parking and storage. "Agricultural structure" means a walled and roofed structure used exclusively for agricultural purposes or uses in connection with the production, harvesting, storage, raising, or drying of agricultural commodities and livestock, including aquatic organisms. Structures that house tools or equipment used in connection with these purposes or uses are also considered to have agricultural purposes or uses.

Page 334 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 79 of 100 ends

"Alteration of a watercourse" means a dam, impoundment, channel relocation, change in channel alignment, channelization, or change in cross-sectional area of the channel or the channel capacity, or any other form of modification which may alter, impede, retard or change the direction and/or velocity of the riverine flow of water during conditions of the base flood.
"ASCE 24" means the standard Flood Resistant Design and Construction, referenced by the building code, developed and published by the American Society of Civil Engineers, Reston, VA. Where cited, ASCE 24 refers to the edition of the standard that is referenced by the building code. "Base flood" means the flood having a one-percent chance of being equaled or exceeded in any given year. [Also defined in CCR Title 24 Part 2.]
"Base flood elevation" means the elevation of the base flood, including wave height, relative to the National Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD) or other datum specified on the flood insurance rate map (FIRM). [Also defined in CCR Title 24 Part 2.] "Basement" means, for the purpose of floodplain management, the portion of a building having its floor subgrade (below ground level) on all sides. [Also defined in CCR Title 24 Part 2.] "Building code" means California Code of Regulations Title 24, the California Building Standards Code, the family of building codes specifically adopted by the State of California and composed of:
(1) Part 2, applicable to buildings and structures other than dwellings within the scope of this part. (2) Part 2.5, applicable to one- and two-family dwellings and townhouses not more than three stories, and accessory structures.
(3) Part 10, applicable to existing buildings (as defined in that code). (4) Other specified codes.
"Design flood" means the flood associated with the greater of the following two areas: [Also defined in CCR Title 24 Part 2.]
(1) Area with a flood plain subject to a one-percent or greater chance of flooding in any year. (2) Area designated as a flood hazard area on a community's flood hazard map, or otherwise legally designated.
"Design flood elevation" means the elevation of the "design flood," including wave height, relative to the datum specified on the community's legally designated flood hazard map. In areas designated as Zone AO, the design flood elevation shall be the elevation of the highest existing grade of the building's perimeter plus the depth number (in feet) specified on the flood hazard map. In areas designated as Zone AO where a depth number is not specified on the map, the depth number shall be taken as being equal to two feet (610 mm). [Also defined in CCR Title 24 Part 2.]
"Development" means any manmade change to improved or unimproved real estate, including but not limited to, buildings or other structures, temporary structures, temporary or permanent storage of materials, mining, dredging, filling, grading, paving, excavations, drilling operations, flood control projects, and other landdisturbing activities. "Encroachment" means the placement of fill, excavation, buildings, permanent structures or other development into a flood hazard area which may impede or alter the flow capacity of riverine flood hazard areas. "Exceptional hardship" means, for the purpose of variances from these regulations or the building code, the exceptional difficulty that would result from a failure to grant a requested variance. Mere economic or financial hardship is not exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or the disapproval of one's neighbors do not, as a rule, qualify as exceptional hardships. All of these circumstances

Page 335 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 80 of 100 ends

can be resolved through other means without granting variances, even when the alternatives are more expensive or require the property owner to build elsewhere or put the parcel to a different use than originally intended. "Existing manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) was completed before July 24, 1980. "Expansion to an existing manufactured home park or subdivision" means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
"Flood or flooding" means a general and temporary condition of partial or complete inundation of normally dry land from:
(1) The overflow of inland or tidal waters.
(2) The unusual and rapid accumulation or runoff of surface waters from any source. (3) Mudslides (i.e., mudflows) which are proximately caused by flooding. "Flood control project" means a dam or barrier design and constructed to keep water away from or out of a specified area, including but not limited to levees, floodwalls, and channelization. "Flood damage-resistant materials" means any construction material capable of withstanding direct and prolonged contact with floodwaters without sustaining any damage that requires more than cosmetic repair. [Also defined in CCR Title 24 Part 2.]
"Flood hazard area" means the greater of the following two areas: [Also defined in CCR Title 24 Part 2.] (1) The area within a floodplain subject to a one-percent or greater chance of flooding in any year. (2) The area designated as a flood hazard area on the community's flood hazard map, or otherwise legally designated.
"Flood insurance rate map (FIRM)" means an official map of a community on which the Federal Emergency Management Agency (FEMA) has delineated both the special flood hazard areas and the risk premium zones applicable to the community. [Also defined in CCR Title 24 Part 2.] "Flood insurance study" means the official report provided by the Federal Emergency Management Agency containing the flood insurance rate map (FIRM), the flood boundary and floodway map (FBFM), the water surface elevation of the base flood and supporting technical data. [Also defined in CCR Title 24 Part 2.] "Floodplain administrator" means the Community Development Director or his or her designee, to leave in administer and enforce the floodplain management regulations. "Floodway" means the channel of the river, creek or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. [Also defined in CCR Title 24 Part 2.] "Fraud or victimization" means, for the purpose of variances from these regulations or the building code, the intentional use of deceit to deprive another of rights or property, making a victim of the deprived person or the public. As it pertains to buildings granted variances to be constructed below the elevation required by the building code, future owners or tenants of such buildings and the community as a whole may bear the burden of increased risk of damage from floods, increased cost of flood insurance, and increased recovery costs, inconvenience, danger, and suffering.

Page 336 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 81 of 100 ends

"Functionally dependent use" means a use that cannot perform its intended purpose unless it is located or carried out in close proximity to water, including only docking facilities, port facilities necessary for the loading or unloading of cargo or passengers, and shipbuilding or ship repair facilities. The term does not include long-term storage, manufacture, sales or service facilities.
"Highest adjacent grade" means the highest natural elevation of the ground surface prior to construction next to the proposed walls or foundation of a structure. "Historic structure" means any structure that is:
(1) Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
(3) Individually listed on the inventory of historic places maintained by the California Office of Historic Preservation; or
(4) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified by the California Office of Historic Preservation. "Letter of map change (LOMC)" means an official determination issued by FEMA that amends or revises an effective flood insurance rate map or flood insurance study. Letters of map change include:
(1) Letter of map amendment (LOMA): An amendment based on technical data showing that a property was incorrectly included in a designated special flood hazard area. A LOMA amends the current effective Flood Insurance Rate Map and establishes that a specific property, portion of a property, or structure is not located in a special flood hazard area. (2) Letter of map revision (LOMR): A revision based on technical data that may show changes to flood zones, flood elevations, special flood hazard area boundaries and floodway delineations, and other planimetric features.
(3) Letter of map revision based on fill (LOMR-F): A determination that a structure or parcel of land has been elevated by fill above the base flood elevation and is, therefore, no longer located within the special flood hazard area. In order to qualify for this determination, the fill must have been permitted and placed in accordance with the community's floodplain management regulations. (4) Conditional letter of map revision (CLOMR): A formal review and comment as to whether a proposed flood protection project or other project complies with the minimum NFIP requirements for such projects with respect to delineation of special flood hazard areas. A CLOMR does not revise the effective flood insurance rate map or flood insurance study; upon submission and approval of certified as-built documentation, a letter of map revision may be issued by FEMA to revise the effective FIRM. "Light-duty truck" means, as defined in 40 C.F.R. 86.082-2, any motor vehicle rated at eight thousand five hundred (8,500) pounds Gross Vehicular Weight Rating or less which has a vehicular curb weight of six thousand (6,000) pounds or less and which has a basic vehicle frontal area of forty-five (45) square feet or less, which is:
(1) Designed primarily for purposes of transportation of property or is a derivation of such a vehicle, or (2) Designed primarily for transportation of persons and has a capacity of more than twelve (12) persons; or
(3) Available with special features enabling off-street or off-highway operation and use.

Page 337 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 82 of 100 ends

"Lowest floor" means the lowest floor of the lowest enclosed area, including basement, but excluding any unfinished or flood-resistant enclosure, usable solely for vehicle parking, building access or limited storage provided that such enclosure is not built so as to render the structure in violation of the non-elevation requirements of the building codes. [Also defined in CCR Title 24 Part 2.] "Manufactured home" means a structure that is transportable in one or more sections, built on a permanent chassis, designed for use as a single-family dwelling with or without a permanent foundation when connected to the required utilities, and constructed to the Manufactured Home Construction and Safety Standards promulgated by the U.S. Department of Housing and Urban Development. Also see definitions in Health and Safety Code Sections 18000(a)(2) and 18001(a). For the purposes of floodplain management, the term also includes mobile homes and recreational vehicles, park trailers, travel trailers and similar transportable structures that are placed on a site for one hundred eighty (180) consecutive days or longer. "Manufactured home park or subdivision" means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
"Market value" means the price at which a property will change hands between a willing buyer and a willing seller, neither party being under compulsion to buy or sell and both having reasonable knowledge of relevant facts.

As used in these regulations, the term refers to the market value of buildings and structures, excluding the land and other improvements on the parcel. Market value may be established by one of the following methods: (1) Actual Cash Value (replacement cost depreciated for age and quality of construction), (2) tax assessment value adjusted to approximate market value by a factor provided by the property appraiser, or (3) a qualified independent appraiser.
"New manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) was completed on or after July 24, 1980. "Nuisance" means that which is injurious to safety or health of an entire community or neighborhood, or any considerable number of persons, or unlawfully obstructs the free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal, or basin. "Permit for floodplain development" means an official document or certificate issued by the community, or other evidence of approval or concurrence, which authorizes performance of specified development activities that are located in flood hazard areas and that are determined to be compliant with these Regulations. "Recreational vehicle" means a vehicle that is built on a single chassis, 400 square feet (37.16 m2 ) or less when measured at the largest horizontal projection, designed to be self-propelled or permanently towable by a light-duty truck, and designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel or seasonal use. A recreational vehicle is ready for highway use when it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices and has no permanently attached additions. Also see definitions in Health and Safety Code section 18010. "Riverine" means relating to, formed by, or resembling a river (including tributaries), stream, brook, etc. "Special flood hazard area (SFHA)" means the land area subject to flood hazards and shown on a Flood Insurance Rate Map or other flood hazard map as Zone A, AE, A1-30, A99, AR, AO, AH, V, VO, VE, or V1-30. [Also defined in CCR Title 24 Part 2.]
"Substantial damage" means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred. [Also defined in CCR Title 24 Part 2.] "Substantial improvement" means any repair, reconstruction, rehabilitation, alteration, addition or other improvement of a building or structure, the cost of which equals or exceeds fifty (50) percent of the market value

Page 338 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 83 of 100 ends

of the structure before the improvement or repair is started. When the structure has sustained substantial damage, any repairs are considered substantial improvement regardless of the actual repair work performed. The term does not, however, include either: [Also defined in CCR Title 24 Part 2.] (1) Any project for improvement of a building required to correct existing health, sanitary or safety code violations identified by the building official and that are the minimum necessary to assure safe living conditions.
(2) Any alteration of a historic structure provided that the alteration will not preclude the structure's continued designation as a historic structure.
"Utility and miscellaneous Group U" means buildings and structures of an accessory character and miscellaneous structure not classified in any special occupancy, as described in the building code. "Variance" means a grant of relief from the requirements of these Regulations which permits construction in a manner otherwise prohibited and where specific enforcement would result in exceptional hardship. "Violation" means a development that is not fully compliant with these regulations or the flood provisions of the building code, as applicable.
"Watercourse" means a river, creek, stream, channel or other topographic feature in, on, through, or over which water flows at least periodically.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 10. Buildings and Structures

12.60.480 Requirements for buildings and structures in flood hazard areas.

Applications for building and structures within the scope of the building code that are proposed in flood hazard areas shall comply with the applicable requirements of the building code and local amendments to the building code specified in Title 12 Buildings and Construction. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.490 Detached garages and accessory storage structures.

Detached garages and accessory storage structures used only for parking or storage (and cannot be attached to any structure used for human habitation or converted to a use for human habitation) are permitted below the base flood elevation provided the garages and accessory storage structures:

A. Are one story and not larger than four hundred (400) square feet in area when located in special flood hazard areas.

B. Are anchored to resist flotation, collapse or lateral movement resulting from flood loads.

C. Have flood openings in accordance with the building code.

D. Have flood damage-resistant materials used below the base flood elevation.

E. Have mechanical, plumbing and electrical systems, including plumbing fixtures, elevated to or above the base flood elevation.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 339 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 84 of 100 ends

12.60.500 Utility and Miscellaneous Group U.

Utility and miscellaneous Group U includes buildings that are accessory in character and miscellaneous structures not classified in any specific occupancy in the building code, including, but not limited to, agricultural buildings, aircraft hangars (accessory to a one- or two-family residence), barns, carports, fences more than six feet (1829 mm) high, grain silos (accessory to a residential occupancy), greenhouses, livestock shelters, private garages, retaining walls, sheds, stables, and towers. In addition to the building code requirements for fire and life safety, the following shall apply to utility and miscellaneous Group U buildings and structures in flood hazard areas:

A. New construction and substantial improvement of such buildings and structures shall be anchored to prevent flotation, collapse or lateral movement resulting from flood loads, including the effects of buoyancy, during conditions of the design flood.

B. New construction and substantial improvement of such buildings and structures, when fully enclosed by walls, shall be elevated such that the lowest floor, including basement, is elevated to or above the design flood elevation in accordance with ASCE 24 or shall be dry floodproofed in accordance with ASCE 24.

C. Unless dry floodproofed, fully enclosed areas below the design flood elevation shall be constructed in accordance with ASCE 24 and limited to parking, storage, and building access.

D. When fully enclosed by walls, flood openings shall be installed in accordance with ASCE 24.

E. Flood damage-resistant materials shall be used below the design flood elevation.

F. Mechanical, plumbing and electrical systems, including plumbing fixtures, shall be located or installed in accordance with ASCE 24.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 11. Subdivisions

12.60.510 Minimum requirements.

Subdivision proposals in flood hazard areas, including proposals for manufactured home parks and subdivisions, shall be reviewed to determine that:

A. Such proposals are consistent with the need to minimize flood damage and will be reasonably safe from flooding.

B. All public utilities and facilities, such as sewer, gas, electric, communications, and water systems are located and constructed to minimize or eliminate flood damage in accordance with Section 12.60.540 and Section 12.60.550 of these regulations, as applicable, and appropriate codes.

C. Adequate drainage is provided to reduce exposure to flood hazards; in Zones AH and AO, adequate drainage paths shall be provided to guide floodwater around and away from proposed structures. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 340 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 85 of 100 ends

12.60.520 Subdivision requirements.

In addition to the requirements of Section 302-1 of these regulations, where any portion of proposed subdivisions, including proposals for manufactured home parks and subdivisions, lies within a flood hazard area, the following shall be required:

A. The flood hazard area, including floodways, as appropriate, shall be delineated on preliminary subdivision plats.

B. Where the subdivision has more than fifty (50) lots or is larger than five acres and base flood elevations are not included on the FIRM, the base flood elevations determined in accordance with Section

12.60.270.A of these regulations.

C. When, as part of a proposed subdivision, fill will be placed to support buildings, the fill shall be placed in accordance with the building code and approval of the subdivision shall require submission of asbuilt elevations for each filled pad certified by a licensed land surveyor or registered civil engineer. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 12. Site Improvements, Utilities and Limitations

12.60.530 Minimum requirements.

All proposed development in flood hazard areas shall be reviewed to determine that:

A. Such proposals are consistent with the need to minimize flood damage and will be reasonably safe from flooding.

B. Where the proposed development has more than fifty (50) lots or is larger than five acres and base flood elevations are not included on the FIRM, the base flood elevations determined in accordance with Section 12.60.270.A of these regulations.

C. All public utilities and facilities, such as sewer, gas, electric, communications, and water systems are located and constructed to minimize or eliminate flood damage.

D. Adequate drainage is provided to reduce exposure to flood hazards; in Zones AH and AO, adequate drainage paths shall be provided to guide floodwater around and away from proposed structures. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.540 Sanitary sewer facilities.

All new and replaced sanitary sewer facilities, private sewage treatment plants (including all pumping stations and collector systems) and on-site waste disposal systems shall be designed in accordance with Chapter 7, ASCE 24, to minimize or eliminate infiltration of floodwaters into the facilities and discharge from the facilities into flood waters, and impairment of the facilities and systems. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 341 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 86 of 100 ends

12.60.550 Water supply facilities.

All new and replaced water supply facilities shall be designed in accordance with the provisions of Chapter 7, ASCE 24, to minimize or eliminate infiltration of floodwaters into the systems. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.560 Development in floodways.

Development, site improvements and land disturbing activity involving fill or regrading shall not be authorized in the floodway unless the floodway encroachment analysis required in Section 12.60.280.A of these regulations demonstrates the proposed work will not result in any increase in the base flood level during occurrence of the base flood discharge.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.570 Limitations on placement of fill.

Subject to the limitations of these Regulations, fill shall be designed to be stable under conditions of flooding including rapid rise and rapid drawdown of floodwaters, prolonged inundation, and protection against floodrelated erosion and scour. In addition to these requirements, when intended to support buildings and structures, fill shall comply with the requirements of the building code. The placement of fill intended to change base flood elevations, change floodway boundaries, or change boundaries of flood hazard areas shown on FIRMs shall be subject to the requirements of Section 12.60.290 of these regulations. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 13. Installation of Manufactured Homes

12.60.580 Installation.

All manufactured homes installed in flood hazard areas shall be installed by an installer that is licensed pursuant to the Business and Professions Code and shall comply with the requirements of the Department of Housing and Community Development (HCD) and the requirements of these regulations. In addition to permits pursuant to these regulations, permits from the HCD are required where the HCD is the enforcement agency for installation of manufactured homes. Upon completion of installation and prior to the final inspection by the floodplain administrator, the installer shall submit certification of the elevation of the manufactured home, prepared by a licensed land surveyor or registered civil engineer, to the floodplain administrator. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.590 Foundations.

All new and replacement manufactured homes, including substantial improvement of manufactured homes installed in flood hazard areas shall be installed on permanent, reinforced foundations that are designed in accordance with the foundation requirements of Section R322.2 of the residential code (CCR Title 24 Part 2.5) and these regulations. Foundations for manufactured homes subject to Section 12.60.620 of these regulations are permitted to be reinforced piers or other foundation elements of at least equivalent strength.

Page 342 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 87 of 100 ends

(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.600 Anchoring.

All new and replacement manufactured homes to be placed or substantially improved in a flood hazard area shall be installed using methods and practices which minimize flood damage and shall be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. Methods of anchoring are authorized to include, but are not limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable State and local anchoring requirements for resisting wind loads and seismic loads.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.610 General elevation requirement.

Unless subject to the requirements of Section 12.60.620 of these regulations, all manufactured homes that are placed, replaced, or substantially improved on sites located: (a) outside of a manufactured home park or subdivision; (b) in a new manufactured home park or subdivision; (c) in an expansion to an existing manufactured home park or subdivision; or (d) in an existing manufactured home park or subdivision upon which a manufactured home has incurred "substantial damage" as the result of a flood, shall be elevated such that the lowest floor, or bottom of the lowest horizontal member of the lowest floor, as applicable to the flood hazard area, is at or above the base flood elevation.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.620 Elevation requirement for certain existing manufactured home parks and subdivisions.

Manufactured homes that are not subject to Section 12.60.610 of these regulations, including manufactured homes that are placed, replaced, or substantially improved on sites located in an existing manufactured home park or subdivision, unless on a site where substantial damage as a result of flooding has occurred, shall be elevated such that either the:

A. Lowest floor, or bottom of the lowest horizontal structural member, as applicable to the flood hazard area, is at or above the base flood elevation.

B. Bottom of the frame is supported by reinforced piers or other foundation elements of at least equivalent strength that are not less than thirty-six (36) inches in height above grade. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.630 Flood damage-resistant materials.

Materials below elevated manufactured homes shall comply with the flood-damage resistant materials requirements of Section R322 of the residential code (CCR Title 24 Part 2.5). (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 343 of 658 ends

Created: 2025-08-14 10:36:47 [EST]
(Supp. No. 44, Update 2)

Page 88 of 100 ends

12.60.640 Enclosures.

Fully enclosed areas below elevated manufactured homes shall comply with the enclosed area requirements of Section R322 of the residential code (CCR Title 24 Part 2.5). (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.650 Protection of mechanical equipment and outside appliances.

Mechanical equipment and outside appliances shall be elevated to or above the lowest floor or bottom of the lowest horizontal structural member of the manufactured home, as applicable to the flood hazard area.

Exception. Where such equipment and appliances are designed and installed to prevent water from entering or accumulating within their components and the systems are constructed to resist hydrostatic and hydrodynamic loads and stresses, including the effects of buoyancy, during the occurrence of flooding up to the elevation required by Section 12.60.610 or Section 12.60.620, as applicable, the systems and equipment shall be permitted to be located below that elevation. Electrical wiring systems shall be permitted below the design flood elevation provided they conform to the provisions of NFPA 70 (National Electric Code). (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 14. Recreational Vehicles

12.60.660 Temporary placement.

Recreational vehicles in flood hazard areas, shall be placed on a site for less than one hundred eighty (180) consecutive days or shall be fully licensed and ready for highway use. Ready for highway use means the recreational vehicle is on wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions, such as rooms, stairs, decks and porches. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.670 Permanent placement.

Recreational vehicles that do not meet the limitations in Section 12.60.660 for temporary placement shall meet the requirements of Article 14 for manufactured homes. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 15. Other Development

12.60.680 General requirements for other development.

All development, including man-made changes to improved or unimproved real estate for which specific provisions are not specified in these regulations or the building code, shall:

A. Be located and constructed to minimize flood damage.

B. Meet the limitations of Section 12.60.560 of these regulations when located in a regulated floodway.

Page 344 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 89 of 100 ends

C. Be anchored to prevent flotation, collapse or lateral movement resulting from hydrostatic loads, including the effects of buoyancy, during conditions of the design flood.

D. Be constructed of flood damage-resistant materials.

E. Have mechanical, plumbing, and electrical systems above the design flood elevation or meet the requirements of ASCE 24, except that minimum electric service required to address life safety and electric code requirements is permitted below the design flood elevation provided it conforms to the provisions of the electrical part of the building code for wet locations. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.690 Tanks.

Tanks that serve buildings shall comply with the requirements of the building code. Underground and aboveground tanks that serve other purposes shall be designed, constructed, installed and anchored in accordance with ASCE 24.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.700 Requirements for temporary structures and temporary storage in flood hazard areas.

Temporary structures shall be erected for a period of less than one hundred eighty (180) days and temporary storage of goods and materials shall be permitted for a period of less than one hundred eighty (180) days.

Extensions may be granted in accordance with Section 12.60.230 of these regulations. In addition, the following apply:

A. Temporary structures shall be anchored to prevent flotation, collapse or lateral movement resulting from hydrostatic loads, including the effects of buoyancy, during conditions of the design flood. Fully enclosed temporary structures shall have flood openings that are in accordance with ASCE 24 to allow for the automatic entry and exit of flood waters.

B. Temporary stored materials shall not include hazardous materials.

C. The requirements of Section 12.60.560 of these regulations, when located in floodways. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.710 Fences in floodways.

Fences in floodways that have the potential to block the passage of floodwaters, such as stockade fences and wire mesh fences, shall meet the limitations of Section 12.60.560 of these regulations. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.720 Oil derricks.

Oil derricks located in flood hazard areas shall be designed in conformance with flood loads required by the building code.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

Page 345 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 90 of 100 ends

12.60.720 Retaining walls, sidewalks and driveways in floodways.

Retaining walls and sidewalks and driveways that involve placement of fill in floodways shall meet the limitations of Section 12.60.560 of these regulations and the requirements for site grading in Chapter 18 of the building code.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.730 Roads and watercourse crossings in floodways.

Roads and watercourse crossings that encroach into floodways or riverine waterways with base flood elevations where floodways have not been designated, including roads, bridges, culverts, low-water crossings and similar means for vehicles or pedestrians to travel from one side of a watercourse to the other side shall meet the limitations of Section 12.60.560 of these regulations. Alteration of a watercourse that is part of work proposed for a road or watercourse crossing shall meet the requirements of Section 12.60.280.C of these regulations. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.740 Swimming pools.

Above-ground swimming pools, on-ground swimming pools, and in-ground swimming pools that involve placement of fill in floodways shall meet the requirement of Section 12.60.560 of these regulations. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Article 16. Flood Control Projects

12.60.750 Flood control projects; general.

In addition to applicable Federal, State and other local permits, a permit for floodplain development is required for construction of flood control projects. The purpose for the permit is to examine the impact on flood hazard areas, floodways, and base flood elevations shown on the FIRM. Unless otherwise authorized by separate regulations, issuance of this permit does not address the sufficiency of the structural elements of the proposed flood control project. Permits for floodplain development and building permits in areas affected by proposed flood control projects shall not be issued based on conditional letters of map revision issued by FEMA. (Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021)

12.60.760 Flood control projects; applications.

Applications for permits for flood control projects shall include documentation including but not limited to:

A. Site plan or document showing the existing topography and the boundaries of the flood hazard areas, floodway boundaries, and base flood elevations shown on the FIRM.

B. Site plan or document showing the proposed topography and the proposed changes to the boundaries of the flood hazard areas, floodway boundaries, and base flood elevations.

C. The documentation submitted to FEMA for a conditional letter of map revision (CLOMR) and, if issued, the conditional letter of map revision. Submittal requirements and processing fees shall be the

Page 346 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 91 of 100 ends

responsibility of the applicant. A CLOMR is required when a proposed flood control project alters a floodway and increases base flood elevations more than greater than 0.00 feet, or alters a watercourse a riverine flood hazard area for which base flood elevations are included in the flood insurance study or on the FIRM and floodways have not been designated and increases base flood elevations more than

1.0 foot.
(Ord. No. 2021-479, § 2, 8-24-2021; Ord. No. 2021-480, § 2, 9-14-2021) Chapter 12.64 WOOD-BURNING APPLIANCES
Sections:

12.64.010 Purpose.

The purpose of this chapter is to improve and maintain air quality conditions in the city in order to protect and enhance the health and quality of life of its citizens, as well as contribute to improvements in regional air quality, by reducing air pollutant emissions from wood-burning fireplaces. (Ord. 01-404 § 2 (part))

12.64.020 Definitions.
"EPA" means the United States Environmental Protection Agency. "EPA certified wood-burning appliance" means any wood-burning device that meets the Code of Federal Regulation in effect at the time of installation and is certified and labeled pursuant to those regulations. "Fireplace" means any permanently installed masonry or factory built wood-burning device designed to be used with an air-to-fuel ratio greater than or equal to 35-to-1, excluding pellet-fueled wood heaters. "Gas fireplace" means any device designed to bun natural gas in a manner that simulates the appearance of a wood-burning fireplace.
"New construction" means construction of new structures and additions to existing structures. "Pellet-fueled wood heater" means any wood-burning device that operates exclusively on wood pellets. "Wood-burning appliance" means fireplace, wood heater, or pellet-fueled wood heater, or any similar device burning any solid fuel used for aesthetic or space-heating purpose. (Ord. 03-253 § 4 (part): Ord. 01-404 § 2 (part))

12.64.030 Application.

A. Only gas fireplaces, pellet-fueled wood heaters, or EPA certified wood-burning appliances may be installed in new construction.

B. Excluded from these regulations are devices intended to be solely used for the preparation of food (i.e., wood-burning ovens and outdoor barbeques), and existing fireplaces.

C. Existing fireplaces, regardless of how many exist, may be used and maintained indefinitely. Once these existing fireplaces are removed, only gas fireplaces, pellet-fueled wood heaters, or EPA certified woodburning appliances may be installed in their place.

Page 347 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 92 of 100 ends

D. It is unlawful to burn garbage, plastics, rubber, paints, solvents, oil, treated wood products, particle board, coal or any other material that produces noxious or toxic emissions when burned in a wood-burning fireplace.
(Ord. 03-253 § 4 (part): Ord. 01-404 § 2 (part))
Chapter 12.68 UNDERGROUNDING UTILITIES15

12.68.010 Purpose.

The purpose of this chapter is to improve and maintain the visual quality and public and private views in the city, as well as to protect and enhance the health and quality of life of its citizens, by reducing hazards along with the visual blight created by overhead utilities.
(Ord. No. 2013-395, § 27, 12-10-2013; Ord. No. 2016-426, § 27, 11-8-2016; Ord. No. 2019-464, §§ 29, 30, 12-10- 2019; Ord. No. 2022-487, §§ 31, 32, 11-29-2022)

12.68.020 Undergrounding utilities.

It is the intent of the city to ensure that all new utility services and relocated existing utility services are placed underground, including additions exceeding fifty (50) percent of floor area and/or seven hundred and fifty (750) square feet or more, excluding basements and any non-habitable floor areas. For the purpose of this section, removal of roof framing with associated exterior walls down to, or below the subfloor/slab shall be included in the above calculations. Therefore, the following shall apply:

A. In areas served by existing overhead facilities, all new service drops shall be installed underground from the most convenient existing pole.

B. Relocations and extensions of existing overhead facilities shall be prohibited; provided, however, relocation of existing poles shall be permitted in some instances pursuant to Section 13.20.160 of this municipal code.

C. Residential properties that are served by utilities located in rear yards on standard lots with frontage on only one public right-of-way shall not be required to underground existing overhead services.

D. The obligation to provide compliance with these underground utility regulations may not be evaded by performing a series of small additions undertaken over a three-year period and/or two code cycles. The original addition permit issuance date where these regulations were in effect shall be used for compliance.

1. Any submittal for building permits which exceed fifty (50) percent and/or seven hundred and fifty (750) square feet of existing floor areas (area calculations shall not include existing basement floor areas and any non-habitable floor areas i.e., garages) during the three-year period shall comply with undergrounding of utility regulations.

2. No exception or waiver shall be granted from compliance with undergrounding utilities. 15Editor's note(s)—Ord. No. 2013-395, adopted Dec. 10, 2013, amended Ch. 12.68 in its entirety, in effect repealing and reenacting said chapter to read as set out herein. The former Ch. 12.68, §§ 12.68.010—12.68.030, pertained to similar subject matter and derived from Ord. No. 07-312, § 1 (part) and Ord. No. 10-359, § 28, adopted Nov. 23, 2010.

Page 348 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 93 of 100 ends

E. The Building Official may only grant exceptions to these requirements in cases where access across adjacent property is necessary but is not legally or practically available.

1. To demonstrate an exception the property owner shall provide a plan showing the required utility design, communication with adjacent property owners indicating the lack of access allowed, and a letter from the utility company which indicates that no alternative configuration for undergrounding of utilities is possible.

F. Completion of Work. Undergrounding utilities shall be completed prior to Building Final Inspection, and issuance of Certificate of Occupancy. No exception or waiver shall be granted which allows for a property owner to evade compliance with this requirement. (Ord. No. 2013-395, § 27, 12-10-2013; Ord. No. 2016-426, § 27, 11-8-2016; Ord. No. 2019-464, §§ 29, 30, 12-10- 2019; Ord. No. 2022-487, §§ 31, 32, 11-29-2022)

12.68.030 Definitions.

For the purpose of this chapter, certain words and phrases used herein are defined as follows:
"Tear-down" means existing portions of roof framing and/or exterior walls removed for the purpose of rebuilding and remodeling.
(Ord. No. 2013-395, § 27, 12-10-2013)
Chapter 12.70 RESIDENTIAL SOLAR SYSTEMS

12.70.010 Definitions.

A. A "Solar energy system" means either of the following:

1. Any solar collector or other solar energy device whose primary purpose is to provide for the collection, storage, and distribution of solar energy for space heating, space cooling, electric generation, or water heating; and

2. Any structural design feature of a building, whose primary purpose is to provide for the collection, storage, and distribution of solar energy for electricity generation, space heating or cooling, or for water heating.

B. A "small residential rooftop solar energy system" means all of the following:

1. A solar energy system that is no larger than ten (10) kilowatts alternating current nameplate rating or thirty (30) kilowatts thermal;

2. A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the city and all state and city health and safety standards;

3. A solar energy system that is installed on a single or duplex family dwelling; and

4. A solar panel or module array that does not exceed the maximum legal building height as defined by the city zoning ordinance, Title 14 in the municipal code.

C. "Electronic submittal" means the utilization of one or more of the following:

1. Email;

2. The internet; and

Page 349 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 94 of 100 ends

3. Facsimile.

D. An "association" means a nonprofit corporation or unincorporated association created for the purpose of managing a common interest development.

E. A "common interest development" means any of the following:

1. A community apartment project;

2. A condominium project;

3. A planned development; or

4. A stock cooperative.

F. "Specific, adverse impact" means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.

G. "Reasonable restrictions" on a solar energy system are those restrictions that do not significantly increase the cost of the system or significantly decrease its efficiency or specified performance, or that allow for an alternative system of comparable cost, efficiency, and energy conservation benefits.

H. "Restrictions that do not significantly increase the cost of the system or decrease its efficiency or specified performance" means:

1. For water heater systems or solar swimming pool heating systems: an amount exceeding ten (10) percent of the cost of the system, but in no case more than one thousand dollars ($1,000.00), or decreasing the efficiency of the solar energy system by an amount exceeding ten (10) percent, as originally specified and proposed; and

2. For photovoltaic systems: an amount not to exceed one thousand dollars ($1,000.00) over the system cost as originally specified and proposed, or a decrease in system efficiency of an amount exceeding ten (10) percent as originally specified and proposed.
(Ord. No. 2015-413, § 1, 9-8-2015)

12.70.020 Purpose.

The purpose of the chapter is to adopt an expedited, streamlined solar permitting process that complies with the Solar Rights Act and AB 2188 (Chapter 521, Statutes 2014) to achieve timely and cost-effective installations of small residential rooftop solar energy systems. The chapter encourages the use of solar systems by removing unreasonable barriers, minimizing costs to property owners and the city, and expanding the ability of property owners to install solar energy systems. The chapter allows the city to achieve these goals while protecting the public health and safety.
(Ord. No. 2015-413, § 1, 9-8-2015)

12.70.030 Applicability.

A. This chapter applies to the permitting of all small residential rooftop solar energy systems in the city.

B. Small residential rooftop solar energy systems legally established or permitted prior to the effective date of this chapter are not subject to the requirements of this chapter unless physical modifications or alterations are undertaken that materially change the size, type, or components of a small rooftop energy system in

Page 350 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 95 of 100 ends

such a way as to require new permitting. Routine operation and maintenance or like-kind replacements shall not require a permit.
(Ord. No. 2015-413, § 1, 9-8-2015)

12.70.040 Solar energy system requirements.

A. All solar energy systems shall meet applicable health and safety standards and requirements imposed by the state and the city.

B. Solar energy systems for heating water in single-family residences and for heating water in commercial or swimming pool applications shall be certified by an accredited listing agency as defined by the California Plumbing and Mechanical Code.

C. Solar energy systems for producing electricity shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability.
(Ord. No. 2015-413, § 1, 9-8-2015)

12.70.050 Duties of the building division and building official.

A. All documents required for the submission of an expedited solar energy system application shall be made available on the publicly accessible city website.

B. Electronic submittal of the required permit application and documents by email, the internet, or facsimile shall be made available to all small residential rooftop solar energy system permit applicants.

C. An applicant's electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature.

D. The city's building division shall adopt a standard plan and checklist of all requirements with which small residential rooftop solar energy systems shall comply to be eligible for expedited review.

E. The small residential rooftop solar system permit process, standard plan(s), and checklist(s) shall substantially conform to recommendations for expedited permitting, including the checklist and standard plans contained in the most current version of the California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research.

F. All fees prescribed for the permitting of small residential rooftop solar energy system must comply with Government Code Section 65850.55, Government Code Section 66015, Government Code Section 66016, and State Health and Safety Code Section 17951.
(Ord. No. 2015-413, § 1, 9-8-2015)

12.70.060 Permit review and inspection requirements.

A. The city building division shall adopt an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems within thirty (30) days of the adoption of this chapter. The building division shall issue a building permit or other nondiscretionary permit within three business days of receipt of a complete application that meets the requirements of the approved checklist and standard plan.

Page 351 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 96 of 100 ends

B. Review of the application shall be limited to the building official's review of whether the application meets local, state, and federal health and safety requirements.

C. Any condition imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.

D. "A feasible method to satisfactorily mitigate or avoid the specific, adverse impact" includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by the city on another similarly situated application in a prior successful application for a permit. The city shall use its best efforts to ensure that the selected method, condition, or mitigation meets the conditions of subparagraphs (A) and (B) of paragraph (1) of subdivision (d) of Section 714 of the Civil Code defining restrictions that do not significantly increase the cost of the system or decrease its efficiency or specified performance.

E. The city shall not condition approval of an application on the approval of an association, as defined in Section 4080 of the Civil Code.

F. If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission.

G. Only one inspection shall be required and performed by the building division for small residential rooftop solar energy systems eligible for expedited review.

H. The inspection shall be done in a timely manner and should include consolidated inspections. An inspection will be scheduled within one to two business days of a request and provide a three-hour inspection window.

I. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized but need not conform to the requirements of this chapter.
(Ord. No. 2015-413, § 1, 9-8-2015)
Chapter 12.72 PROPERTY MAINTENANCE CODE

12.72.010 Title.

This chapter shall be known and may be cited as the "Los Altos Property Maintenance Code" or "LAPMC" and will be referred to in this chapter as "this code."
(Ord. No. 2023-495, § 2, 6-27-2023)

12.72.020 Adoption of the 2021 International Property Maintenance with Amendments.

The 2021 Edition of the International Property Maintenance Code as published by the International Code Council is adopted as the property maintenance code of the city of Los Altos, California, as if fully set out in this chapter, and is amended as provided in this chapter. A copy of the 2021 LAPMC shall be maintained on file in the office of the building official.
(Ord. No. 2023-495, § 2, 6-27-2023)

12.72.030 Amendment of 2021 IPMC Section 102 (Applicability).

Section 102 of the 2021 IPMC is amended as follows:

Page 352 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 97 of 100 ends

102.1-102.7 {IPMC text not modified}
102.8.1 Conflicts. Where conflicts occur between the provision of this code and the referenced standards, the provisions of this code shall apply. Where conflicts occur between the provisions of this code and California Statutes, the provisions of the latter shall apply. 102.8.2-102.11 {IPMC text not modified}
(Ord. No. 2023-495, § 2, 6-27-2023)

12.72.040 Amendment of 2021 IPMC Section 103 (Code Compliance Agency).

Section 103 Code Compliance Agency of the 2021 IPMC is amended as follows:
103.1 Creation of agency. The Code Enforcement Division of the Development Services Department shall be responsible for the implementation, administration, and enforcement of the provisions of this code. The building official in charge of the Los Altos Building & Safety Division of the Development Services Department shall be known as the code official in this chapter.
103.2 {IPMC text not modified}
103.3 Deputies. The code official shall have the authority to appoint 1 or more deputies. Such employees shall have the powers as delegated by the code official. (Ord. No. 2023-495, § 2, 6-27-2023)

12.72.050 Amendment of 2021 IPMC Section 105 (Duties and Powers of the Code Official).

Section 105 of the 2021 IPMC is amended as follows:
105.1-105.2 {IPMC text not modified}
105.3 Right of entry. Where it is necessary to make an inspection to enforce the provisions of this code, or whenever the code official has reasonable cause to believe that there exists in a structure or upon a premises a condition in violation of this code, the code official is authorized to enter the structure or premises at reasonable times to inspect or perform the duties imposed by the code, provided that if such structure or premises is occupied the code official shall present credentials to the occupant and request entry. If such structure or premises is unoccupied, the code official shall first make a reasonable effort to locate the owner, owner's authorized agent, or other person having charge or control of the structure or premises and request entry. If entry is refused, the code official shall have recourse to the remedies provided by law to secure entry.
105.4-105.7.1 {IPMC text not modified}
(Ord. No. 2023-495, § 2, 6-27-2023)

12.72.060 Amendment of 2021 IPMC Section 107 (Means of Appeal).

Section 107 of the 2021 IPMC is amended as follows:
107.1 Application for appeal. Any person directly affected by a decision of the code official or a notice or order issued under this code may appeal that decision, notice or order by filing an appeal with the city clerk within fourteen (14) calendar days of the date of service of that decision, notice, or order. The appeal shall be based on a claim that the true intent of this code or the rules legally adopted thereunder have been incorrectly interpreted, the provisions of this code do not fully apply, or the requirements of this code are

Page 353 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 98 of 100 ends

adequately satisfied by other means. The appeal shall identify the real property, state the grounds for the appeal, and state all material facts in support of the appeal. 107.2 Notice of hearing. Notice of hearing and the hearing shall be conducted as provided for in Chapter 1.12 of the Los Altos Municipal Code.
107.3 Court review. Judicial review of the hearing officer's decision shall be commenced in accordance with Cal. Code of Civil Procedure § 1094.6 no later than ninety (90) calendar days after the decision is signed. Cal.

Code of Civil Procedure § 1094.6 is hereby adopted for purposes of this Title. Review shall be in accordance with Cal. Code of Civil Procedure § 1094.5.
(Ord. No. 2023-495, § 2, 6-27-2023)

12.72.070 Amendment of 2021 IPMC Section 109 (Violations).

Section 109 of the 2021 IPMC is amended as follows:
109.1 Unlawful acts. It is hereby declared to be unlawful and a public nuisance for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert or demolish, equip, use, occupy or maintain any premises, building, structure or building service equipment, or cause or permit the same to be done in violation of this code or this division. 109.2 Notice of violation. The code official shall serve a notice of violation in accordance with Section 111.4. 109.3 Prosecution of violation. Any person failing to comply with a notice of violation served in accordance with Section 111.4 shall be deemed guilty of a misdemeanor but may be charged with an infraction at the discretion of the city attorney, or civil infraction enforceable under Chapter 1.20 of the Los Altos Municipal Code as determined by the city and the violation shall be deemed a strict liability offense. If the notice of violation is not complied with, the code official shall institute the appropriate administrative, civil, or criminal proceeding to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the structure in violation of this code or of the order or direction made pursuant thereto.
109.4 Violation Penalties. Each day during any portion of which any violation of this ordinance is committed or continued by such person shall constitute a separate offense and shall be punishable as provided in this code and Title 1 of the Los Altos Municipal Code.
109.5 Abatement of violation. The city may abate a violation of this code pursuant to the abatement process set forth in the Los Altos Municipal Code.
(Ord. No. 2023-495, § 2, 6-27-2023)

12.72.080 Amendment of 2021 IPMC Section 110 (Stop Work Order).

Section 110 of the 2021 IPMC is amended as follows:
110.1 - 110.3 {IPMC text not modified}
110.4 Failure to comply. Any person who continues any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be liable for civil penalties pursuant to the Los Altos Municipal Code Chapter 1.20. (Ord. No. 2023-495, § 2, 6-27-2023)

Page 354 of 658 ends

Title 12 - BUILDINGS AND CONSTRUCTION
Chapter 12.74 PENALTY FOR EXPIRED PERMITS
Los Altos, California, Code of Ordinances Created: 2025-08-14 10:36:48 [EST] (Supp. No. 44, Update 2)

Page 99 of 100 ends

Chapter 12.74 PENALTY FOR EXPIRED PERMITS16

12.74.010 Application.

This chapter shall apply to all residential, non-residential, and commercial, construction and demolition, including, but not limited to, all additions, alterations, modifications, repairs, and improvements, that require a building permit or demolition permit.
(Ord. No. 2023-498, § 1(App. A), 9-12-2023)

12.74.020 Timely renewal of expired permits.

In the event a permit expires under Chapter 12 of the Los Altos Municipal Code for suspension or abandonment of work, the property owner shall seek renewal of the permit within thirty (30) days following its expiration.
(Ord. No. 2023-498, § 1(App. A), 9-12-2023)

12.74.030 Penalty for expired permits.

A property owner shall be subject to the following penalties for violation of Section 12.74.020:

Time for Permit Expiration Penalty
0 to 30 days $0.00
31st day through 60th day $200.00 per day
61st day through 120th day $400.00 per day
121st day and every day thereafter $800.00 per day
A. For purposes of this section, if a renewed permit expires and the property owner has not advanced a project to the next level of required inspection, the calculation of penalties shall relate back to the date of the previous permit expiration.

B. The building official may reduce or waive a penalty accrued under this chapter upon finding that the property owner acted in good faith and either: (1) the delay was attributable to circumstances beyond the property owner's control; or (2) imposition of the full accrued penalty would harm the public interest, provided, however, that and reduction or waiver of more than ten thousand dollars ($10,000.00) must be approved by the development services director. (Ord. No. 2023-498, § 1(App. A), 9-12-2023)
16Ord. No. 2023-498, § 1(App. A), adopted Sept. 12, 2023, set out provisions designated as Ch. 12.72, §§

12.72.010—12.72.050, insofar as a Ch. 12.72 exists, and at the editor's discretion, these provisions have been codified as Ch. 12.74.

Page 355 of 658 ends

Created: 2025-08-14 10:36:48 [EST]
(Supp. No. 44, Update 2)

Page 100 of 100 ends

12.74.040 Appeal of assessed penalty.

A property owner may request a hearing to contest a citation issued under this chapter in accordance with Title 1 of the Los Altos Municipal Code.
(Ord. No. 2023-498, § 1(App. A), 9-12-2023)

12.74.050 Public nuisance declared.

Any violation of this chapter shall constitute a public nuisance and, in addition to being subject to any other remedies allowed by law, may be abated as provided in Chapter 11.10 of the Los Altos Municipal Code. (Ord. No. 2023-498, § 1(App. A), 9-12-2023)

Page 356 of 658 ends

ORDINANCE NO. 2025-

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOS ALTOS ADDING TITLE 12 FOR BUILDINGS AND CONSTRUCTION TO THE LOS ALTOS MUNICIPAL CODE INCLUDING CHAPTERS 12.04, 12.06, 12.08, 12.10, 12.12, 12.14,

12.16, 12.18, 12.20, 12.22, 12.24, 12.26, 12.28, 12.30, 12.32, 12.34, 12.36, 12.38, AND 12.40 TO ADOPT BY REFERENCE WITH LOCAL AMENDMENTS THE FOLLOWING:
2025 CALIFORNIA ADMINISTRATIVE CODE, PUBLISHED BY THE
INTERNATIONAL CODE COUNCIL, CHAPTER 12.04;
2025 CALIFORNIA BUILDING CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.06;
2025 CALIFORNIA RESIDENTIAL CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.08;
2025 CALIFORNIA ELECTRICAL CODE, PUBLISHED BY THE NATIONAL FIRE PROTECTION AGENCY, CHAPTER 12.10;
2025 CALIFORNIA MECHANICAL CODE, PUBLISHED BY THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, CHAPTER 12.12; 2025 CALIFORNIA PLUMBING CODE, PUBLISHED BY THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, CHAPTER 12.14; 2025 CALIFORNIA ENERGY CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.16;
2025 CALIFORNIA WILDLAND-URBAN INTERFACE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.18;
2025 CALIFORNIA HISTORICAL BUILDING CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.20;
2025 CALIFORNIA FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.22;
2025 CALIFORNIA FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.24;
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.26;
2025 CALIFORNIA REFERENCED STANDARDS CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.28;
CHAPTER 12.30 (PENALTY FOR EXPIRED PERMITS);

Page 357 of 658 ends

2024 INTERNATIONAL PROPERTY MAINTENANCE CODE PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, CHAPTER 12.32 (PROPERTY MAINTENANCE CODE);
1998 UNIFORM CODE FOR THE ABATEMENT OF DANGEROUS BUILDINGS

PUBLISHED BY THE INTERNATIONAL CONFERNECE OF BUILDING OFFICIALS, CHAPTER 12.34 (ABATEMENT OF DANGEROUS BUILDINGS);
1998 UNIFORM HOUSING CODE PUBLISHED BY THE INTERNATIONAL CONFERNECE OF BUILDING OFFICIALS, CHAPTER 12.36 (HOUSING); CHAPTER 12.38 (UNDERGROUNDING UTILITIES);
AND CHAPTER 12.40 (FLOODPLAIN MANAGEMENT);

TOGETHER WITH CERTAIN ADMENDMENTS, ADDITIONS, INSERTIONS, DELETIONS AND CHANGES THERETO.

WHEREAS, the City Council is empowered pursuant to Article XI, Section 7 of the California Constitution to make and enforce within the City all local, police, sanitary, and other ordinances, and regulations not in conflict with general laws; and WHEREAS, The California Building Standards Commission has published the California Building Standards Code, 2025 edition, as provided in the California Code of Regulations, Title 24, and these State mandated regulations go into effect January 1, 2026; and WHEREAS, pursuant to California Government Code Section 50022.1 et seq., the City of Los Altos may adopt by reference the California Building Standards Code, 2025 Edition, as provided in Title 24 of the California Code of Regulations, and the 2024 International Property Maintenance Code; and
WHEREAS, California Health and Safety Code section 17958 requires that cities adopt building regulations that are substantially the same as those adopted by the California Building Standards Commission and contained in the 2025 California Building Standards Code; and WHEREAS, the 2025 California Energy Code is Part 6 of the 2025 California Building Standards Code which implements minimum energy efficiency standards in buildings through mandatory requirements, prescriptive standards, and performance standards; and WHEREAS, California Health and Safety Code Sections 17958.5, 17958.7 and 18941.5 provide that the City of Los Altos may make changes or modifications to the building standards contained in the 2025 California Building Standards Code based upon express findings that such changes or modifications are reasonably necessary because of local climatic, geological or topographical conditions; and
WHEREAS, human activities that release greenhouse gases into the atmosphere contribute to the increase of the worldwide average temperature, drought conditions, and duration of fire seasons; and
WHEREAS, according to the California Department of Forestry and Fire Protection, nine of the ten largest wildfires in California history have occurred since 2017, destroying nearly 10,000 structures and burning of more than 4.5 million acres; and

Page 358 of 658 ends

WHEREAS, the City of Los Altos is situated along areas with a wildland-urban interface and as a result is extremely vulnerable to wildfires and firestorm; and WHEREAS, these amendments are reasonably necessary because of health and safety concerns as the City of Los Altos residents suffer from asthma and other health conditions associated with poor indoor and outdoor air quality exacerbated by the combustion of methane gas; and WHEREAS, removing gas appliances from indoor environments reduces the risk of asthma associated with gas appliances, and removing combustible gas from structures aids in fire hardening and removes a known hazard during firefighting efforts; and WHEREAS, on or about September 20, 2016, the State of California enacted Senate Bill (SB) 32, which added Health and Safety Code Section 38566 to require greenhouse gas emissions to be reduced to 40 percent below 1990 levels by no later than December 31, 2030; and WHEREAS, consistent with federal law stated in the Energy Policy and Conservation Act, the standards contained within this ordinance permit mixed fuel residential construction; and WHEREAS, consistent with AB130, the standards contained within this ordinance permit mixed fuel residential construction consistent with federal law while also incentivizing all-electric construction; and
WHEREAS, consistent with AB130, the standards imposed by this ordinance incentivize electric equipment through the cost-effective installation of electric appliances while preserving energy-equivalent pathways for mixed-fuel residential appliances; and WHEREAS, pursuant to Sections 17958.5 and 17958.7 of the Health and Safety Code, the proposed amendments meet the following conditions to demonstrate local amendments are necessary: the changes are necessary to align local building codes with General Plan and Climate Action Plan goals while permitting mixed-fuel residential construction and incentivizing electric construction, and the changes are necessary to implement the standards contained in this ordinance; and
WHEREAS, the City of Los Altos adopted a General Plan on November, 12, 2002; and later adopted an updated Housing Element on January 24, 2023 and WHEREAS, Policy 7.3 of the City of Los Altos’ General Plan specifies that the City will continue to implement the 2022 Climate Action and Adaptation Plan to encourage reducing greenhouse gas emissions; and
WHEREAS, the City of Los Altos has adopted a Climate Action Plan that identifies actions that the City may take to reduce greenhouse gas emissions, including reducing emissions from buildings such as Focus Area 2: Energy, Strategy 2: Facilitate Building Decarbonization by reducing or eliminating methane gas use in and businesses by 2035, Goal 2.3: Reduce or eliminate methane gas use in existing buildings by increasing fuel switching, Action 2.2A: require all-electric new buildings and major retrofits in which the City adopt Reach Codes that go beyond Title 24 standard during every code cycle; and
WHEREAS, buildings constitute a significant source of greenhouse gas emissions in the City of Los Altos of approximately 42%, and taking reasonable regulatory actions to reduce greenhouse gas emissions from buildings is an important component of the City’s strategy to reduce greenhouse gas emissions; and

Page 359 of 658 ends

WHEREAS, in alignment with the Climate Action and Adaptation Plan, the local amendments to the 2025 California Energy Code establish requirements which will reduce demands for local energy resources, reduce regional pollution, and promote a lower contribution to greenhouse gas emissions; and
WHEREAS, Public Resources Code Section 25402.1(h)2 and Section 10-106 of the 2025 California Administrative Code establish a process which allows local adoption of energy standards that are more stringent than the statewide Standards, provided that a determination that the standards are cost effective is adopted at a public meeting and subsequently filed with the California Energy Commission, and the California Energy Commission finds that the standards will require buildings to be designed to consume less energy than permitted by the 2025 California Energy Code; and WHEREAS, staff has reviewed the cost-effectiveness studies prepared by the California Statewide Codes and Standards Reach Code Program and finds them sufficient to show that the local two-way AC modifications will comply with the requirements of Public Resources Code section 25402.1(h)(2) and Section 10-106 of the 2025 California Administrative Code; and WHEREAS, based on these studies, the City Council finds that the local two-way AC modifications are cost-effective and will require buildings to be designed to consume no more energy than permitted by the California Energy Code; and WHEREAS, scientific evidence has established that methane gas combustion, procurement and transportation produce significant greenhouse gas emissions that contribute to global warming and climate change; and
WHEREAS, using electric appliances in buildings fueled by less greenhouse gas intensive electricity is linked to significantly lower greenhouse gas emissions; and WHEREAS, the most cost-effective time to improve the energy efficiency of existing buildings is during alterations and additions, allowing for electrical infrastructure that is installed alongside other relevant improvements; and
WHEREAS, the local amendments support the City of Los Altos compliance with Bay Area Air District’s amendments to Rule 9-4 and Rule 9-6, which limit the sale of nitrous oxide emitting water and space heating appliances; and
WHEREAS, because of the City of Los Altos’ unique local climatic, geological and topographic conditions, the City of Los Altos finds and determines that amendment and additions to the code are reasonably necessary; and
WHEREAS, that, pursuant to the Public Resources Code section 25402.1(h)(2) and Section 10-106 of the 2025 California Administrative Code, the City Council of Los Altos finds and determines the following: (1) The locally adopted energy efficiency standards contained in this ordinance are cost-effective, and (2) the efficiency standards in this ordinance will require buildings to be designed to consume less energy compared to the 2025 California Energy Code; and WHEREAS, adoption of these updated versions of the California Code of Regulations, with local amendments set forth in this ordinance, are necessary to enhance and safeguard public health, safety, general welfare and to provide safety to firefighters and emergency responders during emergency operations as required by the City’s unique climatic, geological and topographical conditions; and

Page 360 of 658 ends

WHEREAS, pursuant to Sections 17958.5 and 17958.7 of the Health and Safety Code, the proposed amendments meet the following conditions to demonstrate local amendments are necessary: the changes are substantially equivalent to 2022 code amendment changes, and the changes are necessary to implement the standards contained in this ordinance; and WHEREAS, the Development Services Department recommend that changes and modifications be made to the codes and advise that certain said changes and modifications to the California Building Codes, 2025 Edition, are reasonably necessary due to local conditions in the City of Los Altos and further advise that the remainder of said changes and modifications are of an administrative or procedural nature, or concern themselves with subjects not covered by the codes or are reasonably necessary to safeguard life and property within the City of Los Altos; and WHEREAS, the City published notice of the aforementioned public hearing pursuant to California Government Code Section 36933; and
WHEREAS, the City Council held a duly noticed public hearing on DATE TO BE INSERTED, and DATE TO BE INSERTED; and
WHEREAS, the amendments were processed in accordance with the applicable provisions of the California Government Code and the Los Altos Municipal Code; and WHEREAS, the Ordinance amendments set forth below have been reviewed and considered by the City Council in accordance with the provisions of the California Environmental Quality Act of 1970, as amended (“CEQA”), and the guidelines promulgated thereunder and, further, said Council finds that it can be seen with certainty that there is no possibility that said amendments may have a significant effect on the environment and said amendments are therefore exempt from the requirements of the CEQA pursuant to the provisions of Section 15061(b)(3) and 15308 of Division 6 of Title 14 of the California Code of Regulations.

NOW THEREFORE, the City Council of the City of Los Altos does hereby ordain as follows:

SECTION 1.

The recitals set forth above are true and correct and are incorporated into this ordinance by reference as if fully set forth herein.

SECTION 2.

Findings. The City Council hereby finds that the amendments to the 2025 California Building Codes are reasonably necessary because of local climatic, geological, or topographic conditions, and adopts the following findings provided to support the modifications to the 2025 California Building Codes:

1. Climatic Conditions.
a. Santa Clara County and the City of Los Altos annually experience extended periods of high temperatures with little or no precipitation. Additionally, the region experiences storm events which include high to severe winds, which very annually.

These climatic conditions cause extreme drying of vegetation and common building materials. Frequent periods of drought and decreased humidity add to the fire danger. This predisposes the area to large destructive fires (conflagration). In addition to directly damaging or destroying buildings, these fires are also prone to disrupt utility services throughout the County and City. Obstacles generated by a strong wind, such as fallen trees, streetlights and utility poles greatly impact the response time to reach an incident scene. This necessitates the need for an increased

Page 361 of 658 ends

level of fire protection. This added protection will supplement normal fire department responses and provide immediate protection for life and safety during fire occurrences.
b. The climate alternates between extended periods of drought and potential for brief flooding conditions. Flood conditions may affect the Santa Clara County Fire Department’s ability to respond to fire or emergency conditions. Floods also disrupt utility services to buildings and facilities within the County and City. This necessitates the need for additional fire protection features. c. Water demand in this densely populated area far exceeds the quantity supplied by natural precipitation; and although the population continues to grow, the alreadytaxed water supply does not. Due to storage capacities and consumption, and a limited amount of rainfall, particularly during extended periods of drought, future water allocation is not fully dependable. This necessitates the need for additional fire protection features.
d. Dry climatic conditions and winds contribute to the rapid spread of even small fires originating in high-density housing, including fuels such as wood shingles, or vegetation. These fires spread very quickly and create a need for increased levels of fire protection. The added protection of fire sprinkler systems and other fire protection features will supplement normal fire department response by providing immediate protection for the building occupants and by containing and controlling the fire spread to the area of origin.
e. The City is located with the Bay Area Air District, which is considered a nonattainment air basin, which exceeds the allowable levels for air pollutants, the added measures which will reduce further greenhouse gas emissions and will supplement baseline measures while further implementing the City’s greenhouse gas emissions reduction strategy effectively reducing additional air pollutants.

2. Topographical Conditions.
a. Traffic and circulation congestion is artificially created, due to obstructive topographical conditions, which are common throughout portions of Los Altos. b. Topographical conditions combine to create a situation that places fire department response time to fire occurrences at risk and makes it necessary to provide automatic on-site fire-extinguishing systems and other protection measures to protect occupants and property.

SECTION 3.

1. In accordance with Health and Safety Code Sections 17958, 17958.5, and 17958.7, the City Council finds that the two-way AC and electric-readiness changes to building standards affecting residential units in the 2025 California Energy Code are necessary to implement the City’s local code amendment adding a two-way AC and electric-readiness requirement, and that the local code amendment:
a. Is adopted to align with the City’s General Plan adopted on November 12, 2002; and b. Permits mixed-fuel residential construction consistent with federal law; and c. Incentivizes all-electric construction, as part of the City’s adopted greenhouse gas emissions reduction strategy in its 2022 Climate Action and Adaptation Plan In accordance with Public Resources Code Section 25402.1(h)(2) and Section 10-106 of the 2025 California Administrative Code (Cal. Code Regs. Title 24, Part 1), the City Council finds that the City’s two-way AC reach code modifications to the energy standards in the 2025 California Energy Code are cost-effective, and that the modifications will require the diminution of energy consumption levels permitted by the Energy Code.

Page 362 of 658 ends

2. The standards imposed by this Ordinance are substantially equivalent to changes or modifications that were previously passed by City Council on November 29, 2022, and previously filed on [filing date] and were in effect as of September 30, 2025 and will have no material change in regulatory effect.

SECTION 4. ADD TITLE 12 BUILDINGS AND CONSTRUCTION TO THE LOS ALTOS MUNICIPAL CODE. Title 12 of the Los Altos Municipal Code is hereby added as set forth in Appendix 1, Appendix 2, Appendix 3, Appendix 4, Appendix 5, Appendix 6, Appendix 7, Appendix 8, Appendix 9, Appendix 10, Appendix 11, Appendix 12, Appendix 13, Appendix 14, Appendix 15, Appendix 16, Appendix 17, Appendix 18, and Appendix 19 to this Ordinance, underline indicating addition. Title 12, and associated Appendices shall be adopted and codified in numerical order.

SECTION 5. CONSTITUTIONALITY; AMBIGUITIES. If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions hereof. Any ambiguities in the Los Altos Municipal Code created by this Ordinance shall be resolved by the Development Services Director, in their reasonable discretion, after consulting the City Attorney.

SECTION 6. PUBLICATION. This Ordinance shall be published as provided in Government Code Section 36933.

SECTION 7. EFFECTIVE DATE. This Ordinance shall be effective upon the commencement of the thirty-first day following the adoption hereof or January 1, 2026 whichever occurs last.

I HEREBY CERTIFY that the foregoing Ordinance was duly and properly introduced at a regular meeting of the City Council of the City of Los Altos held on DATE TO BE INSERTED, and was thereafter, at a regular meeting held on DATE TO BE INSERTED, passed, and adopted by the following vote:

Page 363 of 658 ends

AYES:

NOES:

ABSENT:

ABSTAIN:

Pete Dailey, MAYOR
Attest:

Melissa Thurman, MMC, CITY CLERK

Page 364 of 658 ends

APPENDIX 1

Page 365 of 658 ends

APPENDIX 2

Page 366 of 658 ends

APPENDIX 3

Page 367 of 658 ends

APPENDIX 4

Page 368 of 658 ends

APPENDIX 5

Page 369 of 658 ends

APPENDIX 6

Page 370 of 658 ends

APPENDIX 7

Page 371 of 658 ends

APPENDIX 8

Page 372 of 658 ends

APPENDIX 9

Page 373 of 658 ends

APPENDIX 10

Page 374 of 658 ends

APPENDIX 11

Page 375 of 658 ends

APPENDIX 12

Page 376 of 658 ends

APPENDIX 13

Page 377 of 658 ends

APPENDIX 14

Page 378 of 658 ends

APPENDIX 15

Page 379 of 658 ends

APPENDIX 16

Page 380 of 658 ends

APPENDIX 17

Page 381 of 658 ends

APPENDIX 18

Page 382 of 658 ends

APPENDIX 19

Page 383 of 658 ends

APPENDIX 1
Chapter 12.04 – Administrative Code
Section 12.04.010 Adoption of the California Administrative Code.

The 2025 California Administrative Code, contained in the California Code of Regulations, Title 24, Part 1, published by the International Code Council, hereinafter called “Administrative Code”, is adopted as the rules, regulations, and standards within the City of Los Altos as to all matters therein except as hereinafter modified or amended. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Page 384 of 658 ends

APPENDIX 2
Chapter 12.06 – Building Code
Section 12.06.010 Adoption of the California Building Code.

Section 12.06.020 Amendments.

Section 12.06.030 Correction of Violations.

Section 12.06.040 Fee Refunds.

Section 12.06.010 Adoption of the California Building Code.

The 2025 California Building Code (2 volumes), contained in the California Code of Regulations, Title 24, Part 2, which incorporates and amends the International Building Code 2024 Edition, published by the California Building Standards Commission and the International Code Council, with the amendments and certain appendices as set forth in Section 12.06.020, is hereby adopted by reference as if fully set forth here. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Section 12.06.020 Amendments.

The 2025 California Building Code referred to in Section 12.06.010 is adopted, together with Chapter 1 of the 2025 California Building Code, with the following amendments and certain Appendix Chapters as follows:

Chapter 1, Division II, Section 105.2 Building: #1, is deleted and replaced to read as follows, based upon the express finding of necessity set forth in Section 6.B.1 of this Ordinance.

A. Work exempt from building permits.

Building permits shall not be required for freestanding unenclosed play structures.

Enclosed accessory structures used as playhouses, tool and storage sheds and similar uses that are less than 120 square feet constructed without electrical, plumbing, or mechanical features do not require building permits, but do require zoning approval to comply with local zoning regulations.

Chapter 1, Division II, Section 110.3.4 is deleted and replaced to read as follows, based upon the express findings of necessity set forth in Section 6.B.2 of this Ordinance.

B. Frame Inspection.

Page 385 of 658 ends

APPENDIX 2
Framing inspection shall be made after the following components are completed:

Roof deck and/or sheathing has been inspected and approved; complete finish roofing materials are installed; the building exterior envelope has all windows and doors installed; all framing, fire-blocking, bracing, pipes, chimneys and vents to be concealed are complete; and all sub-trades including, but not limited to, building, electrical, plumbing and mechanical are roughed in and under required tests.

C. Only the following Appendix Chapters from the Building Code are adopted:

1. Appendix I, Patio Covers.

2. Appendix J, Grading.

Section 903.2 is amended to read as follows:
903.2 Where required. Approved automatic sprinkler systems in new and existing buildings and structures shall be provided in the locations described in this Section or in Sections 903.2.1 through 903.2.12 whichever is the more restrictive and Sections 903.2.14 through 903.2.21.

For the purposes of this section, firewalls and fire barriers used to separate building areas shall be constructed in accordance with the California Building Code and shall be without openings or penetrations.

1. An automatic sprinkler system shall be provided throughout all new buildings and structures, other than Group R occupancies, except as follows:
a. Buildings and structures not located in any Wildland-Urban Interface and not exceeding 1,200 square feet of fire area.
b. Buildings and structures located in any Wildland-Urban Interface Fire Area and not exceeding 500 square feet of fire area.
c. Group S-2 or U occupancies, including photovoltaic support structures, used exclusively for vehicle parking which meet all of the following:
i. Noncombustible construction.
ii. Maximum 5,000 square feet in building area.
iii.Structure is open on not less than three (3) sides nor 75% of structure perimeter.

Page 386 of 658 ends

APPENDIX 2
iv.Minimum of 10 feet separation from existing buildings, or similar structures, unless area is separated by fire walls complying with California Building Code 706.
d. Canopies, constructed in accordance with CBC 406.7.2, used exclusively for weather protection of vehicle fueling pads per CBC 406.7.1 and not exceeding 5,000 square feet of fire area.

2. An automatic sprinkler system shall be installed throughout all new buildings with a Group R fire area.

Exception: Detached Accessory Dwelling Unit, provided that all of the following are met:
a. The unit meets the definition of an Accessory Dwelling Unit as defined in the Government Code Section 65852.2.
b. The existing primary residence does not have automatic fire sprinklers. c. The accessory detached dwelling unit does not exceed 1,200 square feet in size.
d. The unit is on the same lot as the primary residence. e. The unit meets all apparatus access and water supply requirements of Chapter 5 and Appendix B of the 2025 California Fire Code.

3. An approved automatic fire sprinkler system shall be installed in new manufactured homes (as defined in California Health and Safety Code Sections 18007 and 18009) and multifamily manufactured homes with two dwelling units (as defined in California Health and Safety Code Section 18008.7) in accordance with Title 25 of the California Code of Regulations.

4. An approved automatic sprinkler system shall be provided throughout all existing buildings, when additions are made that exceed fifty (50) percent and/or seven hundred and fifty (750) square feet of existing floor areas (area calculations shall not include existing basement floor areas and any non-habitable floor areas i.e., garages).

5. An approved automatic sprinkler system shall be provided throughout all new and existing basements.

Page 387 of 658 ends

APPENDIX 2

6. An approved automatic sprinkler system shall be provided throughout existing buildings and structures when alterations or additions are made that create conditions described in Sections 903.2.1 through 903.2.18

7. Any change in the character of occupancy or in use of any building with a fire area equal to or greater than 3,600 square feet which, in the opinion of the fire code official or building official, would place the building into a more hazardous division of the same occupancy group or into a different group of occupancies and constitutes a greater degree of life safety1 or increased fire risk2, shall require the installation of an approved fire automatic fire sprinkler system. 1 Life Safety – Shall include, but not limited to: Increased occupant load, public assembly areas, public meeting areas, churches, indoor amusement attractions, buildings with complex exiting systems due to increased occupant loads, large schools/day-care facilities, large residential care facilities housing non-ambulatory clients.
2 Fire Risks – Shall include, but not limited to: High-piled combustible storage, woodworking operations, hazardous operations using hazardous materials, increased fuel loads (storage of moderate to highly combustible materials), increased sources of ignition (welding, automotive repair with the use of flammable liquids and open flames).

8. The obligation to provide compliance with these fire sprinkler regulations may not be evaded by performing a series of small additions and/or alterations undertaken over a three-year period and/or two code cycles. The permit issuance dates of past additions and/or alterations where these regulations were in effect shall be used for determining compliance.
a. Any submittal for building permits which exceed fifty (50) percent and/or seven hundred and fifty (750) square feet of existing floor areas (area calculations shall not include existing basement floor areas and any nonhabitable floor areas i.e., garages) during the three-year period shall comply with fire sprinkler regulations.
b. No waiver shall be granted from compliance with fire sprinklers.

Section 903.2.11.7 is amended to read as follows:
903.2.11.7 Chemical Fume Hood Fire Protection. Approved automatic fire extinguishing systems shall be provided in chemical fume hoods in the following cases:

1. Existing hoods having interiors with a flame spread index greater than 25 in which flammable liquids are handled.

Page 388 of 658 ends

APPENDIX 2

2. If a hazard assessment determines that an automatic extinguishing system is required for the chemical fume hood, then the applicable automatic fire protection system standard shall be followed.

Section 907.8 is amended to read as follows:
907.8 Inspection, testing and maintenance. The maintenance and testing schedules and procedures for fire alarm and fire detection systems shall be in accordance with Sections 907.8.1 through 907.8.4 and NFPA 72. Records of inspection, testing and maintenance shall be documented using NFPA 72 record of inspection and testing forms.

Section 12.06.030 Correction of Violations.

The issuance or granting of a permit or approval of plans under this Title shall not prevent the administrative authority from thereafter requiring the correction of errors in such plans and specifications, or from preventing construction operations being carried on thereunder when in violation of this Code or of any other law, or from revoking any certificate of approval when issued in error.

A. The 2025 California Building Code referred to in Section 12.06.010 is adopted, together with Chapter 1 of the 2025 California Building Code, with the following amendments and certain Appendix Chapters as follows:

Chapter 1, Division II, Section 105.5 is deleted and replaced to read as follows, as an administrative clarification, and does not modify a building standard pursuant to California Health & Safety Code Sections 17958, 17958.7 and/or 18941.5 This amendment establishes administrative standards for the effective enforcement of the building standards in the City of Los Altos.

Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 Months after the time the work is commenced. The building official is authorized to grant, in writing, one (1) extension of time for periods not more than 180 days each. The building official is authorized to grant no more than two (2) extensions of time. The extension shall be requested in writing and justifiable cause demonstrated.

Before such work can be recommenced, a new permit shall be first obtained, and the fee therefore shall be one-half (1/2) the amount required for a new permit for such

Page 389 of 658 ends

APPENDIX 2
work provided no changes have been made, or will be made, in the original plans and specifications for such work; and provided, further, that such a suspension or abandonment has not exceeded one year. In order to renew action on a permit after one year expiration, the permittee shall be required to pay original full building permit fees.

For the purpose of this section, failure to progress a project to the next level of required inspection shall be deemed abandonment of the project.

For those projects that are residential only, the Building Official may modify expired permit fees when the owner can demonstrate that the project has received all required inspections, except for the Building Division final. The fee amount of five hundred dollars ($500) shall be required within ten (10) working days of notice and the project shall achieve a final inspection within 30 days of payment received, otherwise expired permit fees as noted above shall be required.

B. Work commencing before permit issuance. Whenever any work for which a permit is required by the California Code of Regulations as adopted in this chapter has been commenced without first obtaining said permit, the building official shall charge a minimum of two (2) times and/or up to four times, for repeat offenders, on all applicable plan review and permit (inspection) fees related to the requiredpermit(s),including,butnotlimitedto,buildingpermits(including, but not limited to electrical, fire, mechanical and plumbing), sign permits and demolition permits. The legal registered owner of said property shall obtain a building permit within 30 days of any violation letter or stop-work notice issued by the City of Los Altos. The payment of the increased fee(s) shall not relieve any person from fully complying with the requirements of this code, other codes adopted by theCity, or the requirements ofthe zoning ordinance. Failure to comply with the provisions of this chapter may also subject the violator to any other penalties, sanctions or remedies provided elsewhere in this code. This provision shall not apply to emergency work when the administration authority determines that such work was urgently necessary and that it was not practical to obtain a permit therefore prior to the commencement of such work. In such cases, a permit shall be obtained as soon as it is practical to do so; and if there is an unreasonable delay (exceeding two working days) in obtaining such permit, a fee as provided in this section shall be charged.

Once building permits are issued pursuant to work commenced without required permits, it is the responsibility of the permit holder to obtain their first required building inspection within 30 days from permit issuance date and shall receive a project final inspection within a one-year period. Any further delays will require

Page 390 of 658 ends

APPENDIX 2
additional building permit fees charged again in the original amount with an additional 30-day extension. If the project continues without meeting these deadlines, Administration Citation Fees and/or other legal remedies allowed by local, or state law shall be imposed.

Failure to contact the Building Division within five (5) business days of receiving the violation notice shall result in Administration Citation Fees, Chapter 1.30 of the Los Altos Municipal Code.

Section 12.06.040 Fee Refunds.

The Building Official may authorize refunding of any fee paid hereunder which was erroneously paid or collected.

The Building Official may authorize refunding of not more than eighty (80%) percent of the permit fee paid when no work has been done under a permit issued in accordance with this code.

The Building Official may authorize refunding of not more than eighty (80%) percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done.

The Building Official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment.

Page 391 of 658 ends

APPENDIX 3
Chapter 12.08 – Residential Code
Section 12.08.010 Residential Code – Adoption of the California Residential Code.

Section 12.08.020. Amendments.

Section 12.08.030 Correction of Violations.

Section 12.08.040 Fee Refunds.

Section 12.08.010 Adoption of the California Residential Code.

The 2025 California Residential Code, contained in the California Code of Regulations, Title 24, Part 2.5, published by the California Building Standards Commission and the International Code Council, which incorporates and amends the 2024 International Residential Code 2024 Edition, is hereby adopted. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Section 12.08.020 Amendments.

The 2025 California Residential Code referred to in Section 12.08.10 is adopted, together with Chapter 1 of the 2025 California Residential Code, with the following amendments to read as follows:

Chapter 1, Division II, Section 105.2 Building: #1, is deleted and replaced to read as follows, based upon the express finding of necessity set forth in Section 6.B.1 of this Ordinance.

A. Work exempt from building permits.

Building permits shall not be required for freestanding unenclosed play structures.

Enclosed accessory structures used as playhouses, tool and storage sheds and similar uses that are less than 120 square feet constructed without electrical, plumbing, or mechanical features do not require building permits, but do require zoning approval to comply with local zoning regulations.

B. Only the following Appendix Chapters from the Building Code are adopted:

Appendix I, Patio Covers.

Chapter 3 Section R301.1.3.2 is deleted and replaced to read as follows, based upon the express finding of necessity set forth in section 9.B.1. of this Ordinance.

Page 392 of 658 ends

APPENDIX 3
R301.1.3.2 Wood frame structures. The building official shall require construction documents to be approved and stamped for structural compliance by a California licensed architect or engineer for all dwellings of wood frame construction more than one story in height located in Seismic Design Category D0, D1, D2, or E.

Chapter 3 Section R309.1 and Section R309.2 are deleted and replaced to read as follows, based upon the express finding of necessity set forth in section 9.B.2. of this Ordinance.

Section R309.1 is amended to read as follows:

R309.1 Townhouse automatic fire sprinkler systems. An automatic residential fire sprinkler system shall be installed in accordance with National Fire Protection Association’s (NFPA) Standard 13D in all new townhouses and in existing townhouses, when additions are made that increase the building area to more than the allowable Fire-Flow Appendix B, Tables B105.1(1) and B105.1(2) of the 2025 California Fire Code, and/or additions exceeding fifty (50) percent of the existing living area (existing square foot calculations shall not include existing basement) and/or additions exceeding seven hundred and fifty (750) square feet. When automatic fire sprinkler systems are required by this section, all associated attached garages shall be included. Additions over fifty (50) percent and/or seven hundred and fifty (750) square feet as referenced above, shall be treated as a new structure regarding installation of fire sprinkler systems. For the purpose of this section, removal of roof framing with associated exterior walls down to, or below the subfloor/slab shall be included in the above calculations. Therefore, the following shall apply:

The obligation to provide compliance with these fire sprinkler regulations may not be evaded by performing a series of small additions undertaken over a three-year period.

The permit issuance dates of past additions where these regulations were in effect shall be used for determining compliance.

Any submittal for building permits which exceed fifty (50) percent and/or seven hundred and fifty (750) square feet of existing floor areas (area calculations shall not include existing basement floor areas and any non- habitable floor areas i.e., garages) during the three-year period shall comply with fire sprinkler regulations.

No waiver shall be granted from compliance with fire sprinklers.

Page 393 of 658 ends

APPENDIX 3
Section R309.2 is amended to read as follows:

R309.2 One and two-family dwellings automatic fire sprinklers systems. An automatic residential fire sprinkler system shall be installed in accordance with National Fire Protection Association’s (NFPA) Standard 13D in all new one and twofamily dwellings and in existing dwellings, when additions are made that increase the building area to more than the allowable Fire-Flow Appendix Tables B105.1(1) and B105.1(2) of the 2025 California Fire Code, and/or additions exceeding fifty (50) percent of the existing living area (existing square foot calculations shall not include existing basement) and/or additions exceeding seven hundred and fifty (750) square feet. When automatic fire sprinkler systems are required by this section, all associated garages shall be included. Additions over fifty (50) percent and/or seven hundred and (750) square feet as referenced above, shall be treated as a new structure regarding installation of fire sprinkler systems. For the purpose of this section, removal of roof framing with associated exterior walls down to, or below the subfloor/slab shall be included in the above calculations. Therefore, the following shall apply:

The obligation to provide compliance with these fire sprinkler regulations may not be evaded by performing a series of small additions undertaken over a three-year period and/or two California Building Standards Code Cycles. The permit issuance date of past additions where these regulations were in effect shall be used for determining compliance.
a. Any submittal for building permits which exceed fifty (50) percent and/or seven hundred and fifty (750) square feet of existing floor areas (area calculations shall not include existing basement floor areas and any non- habitable floor areas i.e., garages) during the three-year period shall comply with fire sprinkler regulations.
b. No waiver shall be granted from compliance with fire sprinklers.

Exceptions:

1. Detached Accessory Dwelling Unit, provided that all of the following are met:

1.1. The unit meets the definition of an Accessory Dwelling Unit as defined in the Government Code Section 65852.2.

1.2. The existing primary residence does not have automatic fire sprinklers.

Page 394 of 658 ends

APPENDIX 3

1.3. The accessory detached dwelling unit does not exceed 1,200 square feet in size.

1.4. The unit is on the same lot as the primary residence.

1.5. The unit meets all apparatus access and water supply requirements of Chapter 5 and Appendix B of the 2025 California Fire Code.

Amend Section R330.7 to read as follows:

R330.7 Fire detection. Rooms and areas within dwelling units, basements and attached garages in which ESS are installed shall be protected by smoke alarms in accordance with Section R310. A heat detector, listed and interconnected to the smoke alarms, shall be installed in locations within dwelling units and attached garages where smoke alarms cannot be installed based on their listing.

ESS installed in Group R-3 and townhomes shall comply with the following:

1. Rooms and areas within dwellings units, sleeping units, basements and attached garages in which ESS are installed shall be protected by smoke alarms in accordance with Section R314.

2. A listed heat alarm interconnected to the smoke alarms shall be installed in locations within dwelling units, sleeping units, and attached garages where smoke alarms cannot be installed based on their listing.

Exceptions:

1. A listed heat detector may be used in place of a heat alarm, so long as it is interconnected with devices that provide an audible alarm at all sleeping areas.

2. A fire sprinkler associated with an approved automatic sprinkler system that triggers an audible alarm upon activation of the waterflow switch, may be used in place of a heat alarm.

Chapter 6 Section R602.10.4.3.1 and Table R602.10.3 (3) footnote “i” are new sections added to read as follows, based upon the express finding of necessity set forth in section

9.B.3. of this Ordinance
Add a new subsection R602.10.4.3.1 to read as follows:

R602.10.4.3.1 Limits on methods GB and PCP. In Seismic Design Categories D0, D1, and D2, Method GB is not permitted for use as intermittent braced wall panels, but gypsum board is permitted to be installed when required by this Section to be placed on the opposite side of the studs from other types of braced wall panel sheathing. In

Page 395 of 658 ends

APPENDIX 3
Seismic Design Categories D0, D1, and D2, the use of Method PCP is limited to accessory structures.

Add a new footnote “i” to the end of CRC Table R602.10.3(3), after the eight footnotes (a) – (h) currently shown, to read:
i. In Seismic Design Categories D0, D1, and D2, Method GB is not permitted, and the use of Method PCP is limited to accessory structures.

Section 12.08.030 Correction of Violations.

The issuance or granting of a permit or approval of plans under this Title shall not prevent the Administrative Authority from thereafter requiring the correction of errors in such plans and specifications, or from preventing construction operations being carried on thereunder when in violation of this Code or of any other law, or from revoking any certificate of approval when issued in error.

A. The 2025 California Residential Code referred to in Section 12.08.010 is adopted, together with Chapter 1 of the 2025 California Residential Code, with the following amendments and certain Appendix Chapters as follows:

Chapter 1, Division II, Section 105.5 is deleted and replaced to read as follows, as an administrative clarification, and does not modify a building standard pursuant to California Health & Safety Code Sections 17958, 17958.7 and/or 18941.5 This amendment establishes administrative standards for the effective enforcement of the building standards in the City of Los Altos.

Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time for periods not more than 180 days each.

Before such work can be recommenced, a new permit shall be first obtained, and the fee therefore shall be one-half (1/2) the amount required for a new permit for such work provided no changes have been made, or will be made, in the original plans and specifications for such work; and provided, further, that such a suspension or abandonment has not exceeded one year. In order to renew action on a permit after

Page 396 of 658 ends

APPENDIX 3
one year expiration, the permittee shall be required to pay original full building permit fees.

For the purpose of this section, failure to progress a project to the next level of required inspection shall be deemed abandonment of the project.

For those projects that are residential only, the Building Official may modify expired permit fees when the owner can demonstrate that the project has received all required inspections, except for the Building Division final. The fee amount of five hundred dollars ($500) shall be required within 10 working days of notice and the project shall achieve a final inspection within 30 days of payment received, otherwise expired permit fees as noted above shall be required.

B. Work commencing before permit issuance. Whenever any work for which a permit is required by the California Code of Regulations as adopted in this chapter has been commenced without first obtaining said permit, the building official shall charge a minimum of two times and/or up to four times, for repeat offenders, on all applicable plan review and permit (inspection) fees related to the required permit(s), including, but not limited to, building permits (including, but not limited to electrical, fire, mechanical and plumbing), sign permits and demolition permits. The legal registered owner of said property shall obtain a building permit within 30 days of any violation letter or stop-work notice issued by the City of Los Altos. The payment of the increased fee(s) shall not relieve any person from fully complying with the requirements of this code, other codes adopted by the city, or the requirements of the zoning ordinance. Failure to comply with the provisions of this chapter may also subject the violator to any other penalties, sanctions or remedies provided elsewhere in this code. This provision shall not apply to emergency work when the administration authority determines that such work was urgently necessary and that it was not practical to obtain a permit therefore prior to the commencement of such work. In such cases, a permit shall be obtained as soon as it is practical to do so; and if there is an unreasonable delay (exceeding two working days) in obtaining such permit, a fee as provided in this section shall be charged.

Once building permits are issued pursuant to work commenced without required permits; it is the responsibility of the permit holder to obtain their first required building inspection within 30 days from permit issuance date and shall receive a project final inspection within a one-year period. Any further delays will require additional building permit fees charged again in the original amount with an

Page 397 of 658 ends

APPENDIX 3
additional 30-day extension. If the project continues past this deadline to obtain a required building inspection, Administration Citation Fees and/or other legal remedies allowed by local, or state law shall be imposed.

Failure to contact the Building Division within five business days of receiving the violation notice may result in Administration Citation Fees, Chapter 1.30 of the Los Altos Municipal Code.

Section 12.08.040 Fee Refunds.

The Building Official may authorize refunding of any fee paid hereunder which was erroneously paid or collected.

The Building Official may authorize refunding of not more than eighty (80%) percent of the permit fee paid when no work has been done under a permit issued in accordance with this code.

The Building Official may authorize refunding of not more than eighty (80%) percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done.

The Building Official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment.

Page 398 of 658 ends

APPENDIX 4
Chapter 12.10 – Electrical Code
Section 12.10.010 Adoption of the California Electrical Code.

The 2025 California Electrical Code, contained in the 2025 California Code of Regulations, Title 24, Part 3, incorporates and amends the National Electrical Code 2023 Edition, published by the National Fire Protection Association, is hereby adopted. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Page 399 of 658 ends

APPENDIX 5
Chapter 12.12 Mechanical Codes
Section 12.12.010 Adoption of the California Mechanical Code.

The 2025 California Mechanical Code, contained in the 2025 California Code of Regulations, Title 24, Part 4, which incorporates and amends the Uniform Mechanical Code 2024 Edition, published by the International Association of Plumbing and Mechanical Officials, is hereby adopted. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Page 400 of 658 ends

APPENDIX 6
Chapter 12.14 Plumbing Code
Section 12.14.010 Plumbing Code – Adoption of the California Plumbing Code.

Section 12.14.020 Amendments.

Section 12.14.010 Plumbing Code – Adoption of the California Plumbing Code.

The 2025 California Plumbing Code, contained in California Code of Regulations, Title 24, Part 5, which incorporates and amends the Uniform Plumbing Code 2024 Edition, published by the International Association of Plumbing and Mechanical Officials, with amendments and certain appendices set forth in Section 12.12.020 is hereby adopted. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Section 12.14.020 Amendments.

The 2025 California Plumbing Code referred to in Section 12.12.010 is adopted with the following amendments and certain Appendix Chapters as follows:

A. Section 710.1 is deleted and replaced to read as follows, based upon the finding of express necessity set forth in Section 8.B.1 of this Ordinance.

B. Drainage of Fixtures Located Below the Next Upstream Manhole or Below the Main Sewer level.
710.1 Backflow Protection All new, replaced, or repaired building sewers, both public and private, requiring sewer connections to the City main sewer system shall be protected from backflow of sewage by installing an accessible approved type of backwater and atmospheric relief valve. Cleanouts for drains that pass through a backwater valve shall be clearly identified with a permanent label stating, “backwater valve downstream”. Building sewers shall have an atmospheric relief valve installed upstream of the backwater valve outside the building in close proximity to the foundation.

Exception: Sewer repairs where there is no existing cleanout located at or near the building foundation, may have these atmospheric relief devices placed near the repair upstream of the newly installed backwater valve.

C. Chapter 12 Section 1211.8 is amended to read as follows, based upon express finding of necessity set forth in section 8.B.2 of this Ordinance. 1211.8 Earthquake-Actuated Gas Shutoff Valves Earthquake-actuated gas shutoff valves designed to automatically shut off the gas at the location of the valve in the event

Page 401 of 658 ends

APPENDIX 6
of a seismic disturbance and certified by the State Architect as conforming to California Code of Regulations, Title 24, Part 12, Chapter 12-16-1, shall be installed in all new buildings, and when reinstalling meters at the same location, and when relocating gas utility meters. Said gas shutoff valves shall be at or near the meter supplying gas to individual buildings.

D. Only the following Appendix Chapters from the Plumbing Code are adopted:

1. Appendix A, Recommended Rules for Sizing the Water Supply System.

2. Appendix B, Explanatory Notes on Combination Waste and Vent Systems.

3. Appendix D, Sizing Storm Water Drainage Systems.

4. Appendix H, Private Sewage Disposal Systems.

5. Appendix I, Installation Standard for Pex Tubing Systems for Hot and –Cold-Water Distribution.

Page 402 of 658 ends

APPENDIX 7
Chapter 12.16 – Energy Code

12.16.010 Adoption of the California Energy Code.

There is hereby adopted by reference as if fully set forth herein, the 2025 California Energy Code, contained in the California Code of Regulations, Title 24, Part 6, published by the International Code Council, and each and all of its regulations and provisions. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

12.16.020 Amendments
City of Los Altos local amendments to the 2025 California Energy Code. Upon adoption of this Code in the event that there is any conflict between local amendments and the 2025 California Energy Code the most restrictive shall prevail.

A. Amend Section 100.0 is to add a new section (i) as follows:
i. Single Family Building Remodel Energy Reach Code - Purpose and Intent. In addition to all requirements of the California Energy Code applicable to Single Family building additions and alterations, the electric readiness measures specified in Sections 150.0(w) shall be required for certain single family additions and alterations.

B. Amend Section 100.1(b) by adding the following definitions:

LEVEL 2 ELECTRIC VEHICLE (EV) CHARGING RECEPTACLE is a 208/240-volt 40- ampere minimum branch circuit and a receptacle.

LOW POWER LEVEL 2 ELECTRIC VEHICLE (EV) CHARGING RECEPTACLE is a 208/240-volt 20-ampere minimum branch circuit and a receptacle.

C. Amend Section 150.0 to add a new section (w) as follows:
(w) Electric Readiness for Remodels, Alterations and Additions

1. Electric range. Where branch circuits or receptacles are added or altered in a kitchen and the work requires an electrical permit, install electrical components in accordance with the California Electrical Code. The electrical components shall include either of the following:

A. A 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor branch circuit rated at 50 amps minimum, within 3 feet from the appliance and accessible to the appliance with no obstructions. Both ends of the unused conductor shall be labeled with the word “spare” and be electrically isolated. Space shall be reserved for a single

Page 403 of 658 ends

APPENDIX 7
pole circuit breaker in the electrical panel adjacent to the circuit breaker for the branch circuit and labeled with the words “Future Use”.

B. A pathway for a future 240 volt 50 amp minimum branch circuit that shall consist of either conductors or raceway from the main electrical service panel. The main electric panel shall have space reserved to allow for the installation of a double pole circuit breaker for a future electric range installation. The reserved space shall be permanently marked as “For Future 240V use”. The raceway or conductors shall terminate at a junction box within 3 feet of the appliance. The blank cover shall be identified as “240V ready”.

2. Electric dryer. Where a branch circuit is added or altered within 3 feet of a gas or propane clothes dryer and the work requires an electrical permit, install electrical components in accordance with the California Electrical Code. The electrical components shall include either of the following:

A. A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor branch circuit rated at 30 amps minimum, within 3 feet from the appliance and accessible to the appliance with no obstructions. Both ends of the unused conductor shall be labeled with the word “spare” and be electrically isolated. Space shall be reserved for a single pole circuit breaker in the electrical panel adjacent to the circuit breaker for the branch circuit and labeled with the words “Future Use”; or, B. A pathway for a future 240 volt 30 amp minimum branch circuit that shall consist of either conductors or raceway from the main electrical service panel. The main electric panel shall have space reserved to allow for the installation of a double pole circuit breaker for a future heat pump dryer installation. The reserved space shall be permanently marked as “For Future 240V use”. The raceway or conductors shall terminate at a junction box within 3 feet of the appliance. The blank cover shall be identified as “240V ready”.

3. Heat pump water heater.

A. If wall framing is removed or replaced within 3 feet of a gas or propane water heating appliance, space suitable for the future installation of a heat pump water heater (HPWH) shall be provided. The space shall be at least 2.5 feet by

2.5 feet wide and 7 feet tall and shall include a condensate drain that is no more than 2 inches higher than the base of an installed water heater and allows natural draining without pump assistance or installed piping or tubing within 3 feet of the water heater location to a condensate drain or exterior location. If pump assistance is needed, a receptacle on a 120 volt, minimum 15 amp branch circuit for a condensate pump must be available within 3 feet of the water heater location.

Page 404 of 658 ends

APPENDIX 7
B. Where branch circuits are altered or added within 3 feet of an existing gas or propane water heater or within 10 feet of the designated future location of a heat pump water heater as required under Section 150.0(w)3A, and the work requires an electrical permit, install electrical components in accordance with the California Electrical Code. The electrical components shall include either of the following:
i. A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit rated at 30 amps minimum, within 3 feet from the water heater and accessible to the water heater with no obstructions. Both ends of the unused conductor shall be labeled with the word “spare” and be electrically isolated. Space shall be reserved for a single pole circuit breaker space in the electrical panel adjacent to the circuit breaker for the branch circuit and labeled with the words “Future 240V Use”; or
ii. A pathway for a future 240 volt 30 amp minimum branch circuit that shall consist of either conductors or raceway from the main electrical service panel. The main electric panel shall have space reserved to allow for the installation of a double pole circuit breaker for a future HPWH installation. The reserved space shall be permanently marked as “For Future 240V use”. The pathway shall terminate at a junction box within 3 feet of the appliance. The blank cover shall be identified as “240V ready”.

4. Outdoor gas appliances. Where a gas line is added or extended to any pool water heater, spa water heater, sauna, fireplace, outdoor cooking appliance, or outdoor heating system, install infrastructure and reserve physical space to accommodate future installation of an electric equivalent of that system that serves the same function, as certified by a registered design professional or licensed electrical contractor.

A. Install conduit designed to serve a future electric appliance(s) with the same function, including the appropriate voltage, phase, minimum amperage, and an electrical receptacle or junction box within five feet of the appliance that is accessible with no obstructions, in accordance with manufacturer requirements and the California Electrical Code. In lieu of or in addition to conduit, electrically isolated branch circuit wiring may be installed; and B. Label both ends of the unused conduit or conductors “For Future Electrical Appliance”; and

Page 405 of 658 ends

APPENDIX 7
C. Reserve circuit breakers in the electrical panel(s) for each branch circuit, appropriately labeled; and
D. Designate physical space for future electric appliances, including equipment footprint, on the construction drawings. The footprint necessary for future electric appliances may overlap with the location of currently designed combustion equipment.

Exception to Section 150.0(w)4: Generator systems used for emergency power generation.

5. Electrical Power Upgrades. Increases in the electrical power infrastructure capacity serving a building shall only be permitted when all the following are documented and submitted to the building official:

A. Calculations in accordance with California Electrical Code Article 220.83 determining future loads will exceed the capacity of the current electrical power infrastructure.

B. Where data is available, calculations in accordance with California Electrical Code Article 220.87 determining that future loads exceed the capacity of the current electrical service infrastructure.

C. Calculations for item (A) and item (B) above shall include at least one of the following:
i. At least one power management or circuit controlling device, serving electric-only appliances such as:
a. Water heater(s)
b. Clothes dryer(s)
c. Range(s)
d. Level 2 EV Charging Receptacle or
e. Low Power Level 2 EV Charging Receptacle
ii. At least one of the following electric-only appliances operating on 120V:
a. Water heater(s)
b. Clothes dryers(s)
c. Range(s)
iii. Circuit control between whole home load and Level 2 EV Charging Receptacle or Low Power Level 2 EV Charging Receptacle
Exception 1 to Section 150.0(w)5: The upgrade is solely the result of a project proposing electrical improvements supporting loads related to devices and uses not regulated by 150.0(w).

Page 406 of 658 ends

APPENDIX 7
Exception 1 to Section 150.0(w): The project is solely related to a repair as defined by Title 24 Part 2 Section 202.

Exception 2 to Section 150.0(w): If an electrical permit is not otherwise required for the project other than compliance with this section.

Exception 3 to Section 150.0(w): Where upgrades to the existing electrical panel or utility service are not proposed, electrical panel capacity shall not be required to exceed the existing utility electrical service to the building to meet compliance with this section. Capacity and overcurrent protection spaces shall be reserved to the extent allowable under the existing electrical panel capacity using the methodology in Section 150(w)5. Tandem overcurrent protection devices shall be used to the extent permissible under the California Electrical Code.

Exception 4 to Section 150.0(w): A Covered Single-Family Project that consists solely of medically necessary improvements or solely of seismic safety improvements
Exception 5 to Section 150.0(w): Mobile Homes, Manufactured Housing, or Factorybuilt Housing as defined in Division 13 of the California Health and Safety 12 Code (commencing with Section 17000 of the Health and Safety Code).

Exception 6 to Section 150.0(w): Emergency Housing pursuant to Appendix P of the California Building Code.

Exception 7 to Section 150.0(w): Creation of a new accessory dwelling unit or junior accessory dwelling unit that is within the existing space of a single-family dwelling or accessory structure and includes an expansion of not more than 150 square feet beyond the same physical dimensions as the existing accessory structure. An expansion beyond the physical dimensions of the existing accessory structure shall be limited to accommodating ingress and egress. Or, if the project would not otherwise be a Covered Single-Family Project were it not for the inclusion of an accessory dwelling unit or junior accessory dwelling unit that meets the criteria above.

D. Amend Section 150.2(b)1C to read:

C. Entirely new or complete replacement space-conditioning systems installed as part of an alteration, shall include all the system heating or cooling equipment, including but not limited to: condensing unit cooling or heating coil, and air handler for split systems; or complete replacement of a packaged unit; plus entirely new or replacement duct system (Section 150.2(b)1Diia).

Page 407 of 658 ends

APPENDIX 7
Entirely new or complete replacement space-conditioning systems shall meet the requirements of Sections 150.0(h), 150.0(i), 150.0(j)1, 150.0(j)2, 150.0(m)1 through 150.0(m)10; 150.0(m)12; 150.0(m)13,
150.1(c)7,150.2(b)1G, and TABLE 150.2-A. Additionally, where an entirely new or complete replacement space conditioning system includes a new or replacement air-cooled air conditioner in Climate Zones 1 through 14 and 16, it shall meet the applicable requirements of Section 150.2(b)1Fiv. Where an entirely new or complete replacement space conditioning system includes a new or replacement heat pump, it shall meet the applicable requirements of Section 150.2(b)1Fv.

E. Amend Section 150.2(b)1F to read:

F. Altered space-conditioning system - mechanical cooling. Alterations which install new or replacement air-cooled air conditioners shall meet the applicable requirements of subsections i and iv. Alterations which install new or replacement heat pumps shall meet the applicable requirements of subsections i, ii, iii, and v. All other alterations to refrigerant containing components such as the compressor, condensing coil, evaporator coil, refrigerant metering device, or refrigerant piping, shall meet the applicable requirements of subsections i, ii, and iii.
i. All thermostats associated with the system shall be replaced with setback thermostats meeting the requirements of Section 110.2(c). ii. Air-cooled air conditioners in Climate Zones 2 and 8 through 15 and airsource heat pumps in all climate zones, including but not limited to ducted split systems, ducted package systems, small duct high velocity air systems, and minisplit systems, shall comply with Subsections a and b, unless the system is of a type that cannot be verified using the specified procedures. Systems that cannot comply with the requirements of 150.2(b)1Fii shall comply with Section 150.2(b)1Fiii.

Exception to Section 150.2(b)1Fii: Entirely new or complete replacement packaged systems for which the manufacturer has verified correct system refrigerant charge prior to shipment from the factory are not required to have refrigerant charge confirmed through field verification and diagnostic testing. The installer of these packaged systems shall certify on the Certificate of Installation that the packaged system was pre-charged at the factory and has not been altered in a

Page 408 of 658 ends

APPENDIX 7
way that would affect the charge. Ducted systems shall comply with minimum system airflow rate requirement in Section 150.2(b)1Fiia, provided that the system is of a type that can be verified using the procedure specified in RA3.3 or an approved alternative in RA1. a. Minimum system airflow rate shall comply with the applicable Subsection I or II below as confirmed through field verification and diagnostic testing in accordance with the procedures specified in Reference Residential Appendix Section RA3.3 or an approved alternative procedure as specified in Section RA1.

I. Small duct high velocity systems shall demonstrate a minimum system airflow rate greater than or equal to
250 cfm per ton of nominal cooling capacity; or
II. All other air-cooled air conditioner or air-source heat pump systems shall demonstrate a minimum system
airflow rate greater than or equal to 300 cfm per ton of nominal cooling capacity; and
Exception 1 to Section 150.2(b)1Fiia: Systems unable to comply with the minimum airflow rate requirement shall
demonstrate compliance using the procedures in Section
RA3.3.3.1.5; and the system's thermostat shall conform to the specifications in Section 110.12.

Exception 2 to Section 150.2(b)1Fiia: Entirely new or complete replacement space conditioning systems, as specified by Section 150.2(b)1C, without zoning dampers may comply with the minimum airflow rate by meeting the applicable
requirements in Tables-150.0-B or 150.0-C as confirmed by field verification and diagnostic testing in accordance with the procedures in Reference Residential Appendix Section
RA3.1.4.4 and RA3.1.4.5. The design clean-filter pressure drop requirements of Section 150.0(m)12C for the system air filter device(s) shall conform to the requirements given in
Tables150.0-B and 150.0-C.
b. The installer shall charge the system according to manufacturer’s specifications. Refrigerant charge shall be verified according to one of the following options, as applicable.

Page 409 of 658 ends

APPENDIX 7
I. The installer and rater shall perform the standard charge verification procedure as specified in Reference Residential Appendix Section RA3.2.2, or an approved alternative procedure as specified in Section RA1; or II. The installer shall perform the weigh-in charging procedure as specified by Reference Residential Appendix Section RA3.2.3.1 provided the system is of a type that can be verified using the RA3.2.2 standard charge verification procedure and RA3.3 airflow rate verification procedure or approved alternatives in RA1. The ECC-Rater shall verify the charge using RA3.2.2 and RA3.3 or approved alternatives in RA1.

Exception 1 to Section 150.2(b)1Fiib: When the outdoor temperature is less than 55° F and the installer utilizes the weigh-in charging procedure in Reference Residential Appendix Section RA3.2.3.1to demonstrate compliance, the installer may elect to utilize the verification procedure in Reference Residential Appendix Section RA3.2.3.2. If the verification procedure in Section RA3.2.3.2 is used for compliance, the system's thermostat shall conform to the specifications in Section 110.12. Ducted systems shall comply with the minimum system airflow rate requirements in Section 150.2(b)1Fiia.
iii. Air-cooled air conditioners in Climate Zones 2 and 8 through 15 and airsource heat pumps in all climate zones, including but not limited to ducted split systems, ducted package systems, small duct high velocity, and minisplit systems, which are of a type that cannot comply with the requirements of 150.2(b)1Fiib shall comply with subsections a and b, as applicable.
a. The installer shall confirm the refrigerant charge
using the weigh-in charging procedure specified in
Reference Residential Appendix Section RA3.2.3.1,
as verified by an ECC-Rater according to the
procedures specified in Reference Residential
Appendix RA3.2.3.2; and
b. Systems that utilize forced air ducts shall comply
with the minimum system airflow rate requirement in
Section 150.2(b)1Fiia provided the system is of a type
that can be verified using the procedures in Section
RA3.3 or an approved alternative procedure in
Section RA1.

Page 410 of 658 ends

APPENDIX 7
Exception to Section 150.2(b)1Fiii: Entirely new or
complete replacement packaged systems for which the
manufacturer has verified correct system refrigerant
charge prior to shipment from the factory are not
required to have refrigerant charge confirmed through
field verification and diagnostic testing. The installer of these packaged systems shall certify on the Certificate of Installation that the packaged system was precharged at the factory and has not been altered in a way that would affect the charge. Ducted systems shall
comply with minimum system airflow rate requirement
in Section 150.2(b)1Fiiib, provided that the system is of a type that can be verified using the procedure specified in Section RA3.3 or an approved alternative in Section RA1. iv. New or replacement air-cooled air conditioners in Climate Zones 1 through 14 and 16 shall meet the requirements of Section 150.2(b)1Fiva or 150.2(b)1Fivb.
a. Systems with existing duct distribution systems shall meet the following requirements:

I. In all climate zones, meet the airflow and fan efficacy requirements of Section 150.0(m)13B, 150.0(m)13C, or
150.0(m)13D.

Exception 1 to Section 150.2(b)1FivaI: Single zone
central forced air systems and zonally controlled central forced air systems may demonstrate compliance with an
airflow greater than or equal to 300 CFM per ton of
nominal cooling capacity.

II. In all climate zones, meet the refrigerant charge
verification requirements of Section 150.2(b)1Fii; and
III. In all climate zones, vented attics shall have insulation installed to achieve a U-factor of 0.020 or insulation
installed at the ceiling level shall result in an insulated thermal resistance of R-49 or greater for the insulation alone; luminaires not rated for insulation contact must be replaced or retrofitted with a fireproof cover that
allows for insulation to be installed directly over the cover; and

Page 411 of 658 ends

APPENDIX 7
Exception 1 to Section 150.2(b)1FivaIII: Dwelling units with at least R-38 existing insulation installed at the ceiling level.

Exception 2 to Section 150.2(b)1FivaIII: Dwelling units where the alteration would directly cause the
disturbance of asbestos unless the alteration is made in conjunction with asbestos abatement.

Exception 3 to Section 150.2(b)1FivaIII: Dwelling units with knob and tube wiring located in the vented attic.

Exception 4 to Section 150.2(b)1FivaIII: Where the
accessible space in the attic is not large enough to
accommodate the required R-value, the entire
accessible space shall be filled with insulation provided such installation does not violate Section 806.3 of Title 24, Part 2.5.

Exception 5 to Section 150.2(b)1FivaIII: Where the attic space above the altered dwelling unit is shared with
other dwelling units and the requirements of Section
150.2(b)1FivaIII are not triggered for the other dwelling units.

IV. In all climate zones, air seal all accessible areas of the ceiling plane between the attic and the conditioned
space in accordance with Section 110.7.

Exception 1 to Section 150.2(b)1FivaIV: Dwelling units
with at least R-38 existing insulation installed at the ceiling level.

Exception 2 to Section 150.2(b)1FivaIV: Dwelling units
where the alteration would directly cause the
disturbance of asbestos unless the alteration is made in conjunction with asbestos abatement.

Exception 3 to Section 150.2(b)1FivaIV: Dwelling units
with atmospherically vented space heating or water
heating combustion appliances located inside the
pressure boundary of the dwelling unit.
b. Systems with entirely new or complete replacement duct systems shall meet the following:

Page 412 of 658 ends

APPENDIX 7
I. R-8 duct insulation shall be installed for
all new ducts located in unconditioned
space; and
II. In all climate zones, meet the airflow
requirements of Section 150.0(m)13B,
150.0(m)13C, or 150.0(m)13D and
demonstrate an air-handling unit fan
efficacy of less than or equal to 0.35
W/CFM.

III. In all climate zones, meet the refrigerant
charge verification requirements of
Section 150.2(b)1Fii;
Exception 1 to Section 150.2(b)1Fiv: Where
the capacity of the existing main electrical
service panel is insufficient to supply the
electrical capacity of a heat pump and where
the existing main electrical service panel is
sufficient to supply a new or replacement air
conditioner, as calculated according to the
requirements of California Electrical Code
Article 220.83 or Article 220.87, systems shall
comply with the applicable requirements of
Sections 150.2(b)1Fi, 150.2(b)1Fii, and
150.2(b)1Fiii. Documentation of electrical load
calculations in accordance with Article 220
must be submitted to the enforcement agency
prior to permitting both the heat pump and
proposed air conditioner.

Exception 2 to Section 150.2(b)1Fiv: Where
the required capacity of a heat pump to meet
the system selection requirements of Section
150.0(h)5 is greater than or equal to 12,000
Btu/h more than the greater of the required
capacity of an air conditioner to meet the design
cooling load OR the capacity of the existing air
conditioner, systems shall comply with the
applicable requirements of Sections

Page 413 of 658 ends

APPENDIX 7
150.2(b)1Fi, 150.2(b)1Fii, and 150.2(b)1Fiii.

Documentation of heating and cooling load
calculations in accordance with 150.0(h) must
be submitted to the enforcement agency prior
to permitting for both the heat pump and
proposed air conditioner.
v. In all climate zones, heat pumps with supplementary heat, including, but not limited to, electric resistance heaters or gas furnace supplementary heating, shall comply with Section 150.0(h)7 and shall lock out supplementary heating above an outdoor air temperature of no greater than 35°F.

F. Amend Section 150.2(b)2 to read:

Performance approach. The energy budget for alterations is expressed in terms of Long-term System Cost (LSC), and the altered component(s) and any newly installed equipment serving the alteration shall meet the applicable requirements of Subsections A, B, and C below.

A. The altered components shall meet the applicable requirements of Sections 110.0 through 110.9, Sections 150.0(a) through (l), Sections 150.0(m)1 through 150.0 (m)10, and Sections 150.0(p) through (q). Entirely new or complete replacement mechanical ventilation systems as these terms are used in Section 150.2(b)1L, shall comply with the requirements in Section 150.2(b)1L. Altered mechanical ventilation systems shall comply with the requirements of Section 150.2(b)1M. Entirely new or complete replacement space-conditioning systems, and entirely new or complete replacement duct systems, as these terms are used in Sections 150.2(b)1C and 150.2(b)1Diia, shall comply with the requirements of Sections 150.0(m)12 and 150.0(m)13. New or replacement air-cooled air conditioners in Climate Zones 1 through 14 and 16 shall meet the applicable requirements of Section 150.2(b)1Fiv.

B. The standard design for an altered component shall be the higher efficiency of existing conditions or the requirements stated in Table 150.2-G. For components not being altered, the standard design shall be based on the existing conditions. When the third party verification option is specified as a requirement, all components proposed for alteration for which the additional credit is taken, must be verified by a certified ECC-rater.

Page 414 of 658 ends

APPENDIX 7
Table 150.2-G is hereby amended to read:

Table 150.2-G Standard Design for an Altered Component
Altered
Component
Standard Design Without Third Party
Verification of Existing Conditions
Shall be Based On
Standard Design With Third
Party Verification of Existing
Conditions Shall be Based On
Ceiling
Insulation,
Wall
Insulation,
and Raisedfloor
Insulation
The requirements of Sections 150.0(a),
(c), and (d).

The requirements of Section 150.2(b)1J
for altered ceilings and for entirely new
or complete replacement duct systems
where the air handler and ducts are
located within a vented attic. The
requirements of Section 150.2(b)1Fiv for
alterations which include new or
replacement air-cooled air
conditioners.

The existing insulation R-value
Fenestration The requirements of Section
150.1(c)3A.

The existing fenestration Ufactor and SHGC values as
verified.

Window Film The requirements of Section
150.1(c)3A.

The existing fenestration in the
alteration shall be based on
TABLE 110.6-A and TABLE
110.6-B.

Doors The U-factor of 0.20. The door area shall
be the door area of the existing building.

If the proposed U-factor is <

0.20, the standard design shall
be based on the existing Ufactor value as verified.

Otherwise, the standard design
shall be based on the U-factor
of 0.20. The door area shall be

Page 415 of 658 ends

APPENDIX 7
the door area of the existing
building.

SpaceHeating and
SpaceCooling
Equipment
Table 150.1-A for equipment efficiency
requirements; Section 150.2(b)1C for
entirely new or complete replacement
systems; Section 150.2(b)1F for
refrigerant charge verification, airflow,
and fan efficacy requirements. Section
150.2(b)1Fiv for new or replacement aircooled air conditioners The existing efficiency levels.

Air
Distribution
System –
Duct Sealing
The requirements of Sections
150.2(b)1D and 150.2(b)1E
The requirements of Sections
150.2(b)1D and 150.2(b)1E
Air
Distribution
System –
Duct
Insulation
The requirements of Sections
150.2(b)1D, and for new or replacement
air-cooled air conditioners, Section
150.2(b)1Fiv.

The existing efficiency levels.

Water
Heating
Systems
The requirements of Section
150.2(b)1Hii
The existing efficiency level.

Roofing
Products
The requirements of Section 150.2(b)1I. The requirements of Section 150.2(b)1I
All Other
Measures
The proposed efficiency levels. The existing efficiency levels.

C. The proposed design shall be based on the actual values of the altered components.

Page 416 of 658 ends

Appendix 8
Chapter 12.18 – Wildland – Urban Interface
Section 12.18.010 Adoption of the 2025 California Wildland Urban Interface The 2025 California Wildland Urban Interface, contained in the 2025 California Code of Regulations, Title 24, Part 7, which incorporates and amends the International WildlandUrban Interface, 2024 Edition, published by the International Code Council, is hereby adopted. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Page 417 of 658 ends

Appendix 9
Chapter 12.20 – Historical Building Code

12.20.010 - Adoption of the California Historical Building Code.

There is hereby adopted by reference as if fully set forth herein, the 2025 California Historical Building Code, contained in the California Code of Regulations, Title 24, Part 8, published by the International Code Council, is hereby adopted. One (1) copy of said code is on file for use and examination by the public in the Development Services Department of the City of Los Altos.

Page 418 of 658 ends

Chapter 12.22 – Fire Code
Section 12.22.010 Adoption of the California Fire Code
Section 12.22.015 Findings.

Section 12.22.020 Establishment and duties of the fire prevention division. Section

12.22.030 Definitions.

Section 12.22.080 Fire Code Amendments.

Section 12.22.010 Adoption of the 2025 California Fire Code There is hereby adopted by the City, for the purpose of prescribing regulation governing conditions hazardous to life and property from fire or explosion, that certain code known as the 2025 California Fire Code, contained in the 2025 California Code of Regulations, Title 24, Part 9, which incorporates and amends the International Fire Code 2024 Edition, published by the International Code Council, including Appendix Chapters B, C, D and O, save and except such portions as are hereinafter deleted, modified or amended by this chapter. One copy has been filed for use and examination by the public in the office of the Building Official.

Said codes are adopted and incorporated as fully as if set out at length herein, and from the date on which the ordinance codified in this chapter shall take effect.

Section 12.22.015 Findings.

The City Council of the City of Los Altos hereby expressly finds that amendments to the California Fire Code adopted by this chapter and commencing with Section

12.22.080 are reasonably necessary for the protection of the public health, safety, and welfare, due to the local climatic, geologic, or topographical conditions specified as follows:

The City of Los Altos experiences low humidity, high winds and warm temperatures during the summer months creating conditions which are particularly conducive to the ignition and spread of grass, brush, and structure fires. Additionally, the City of Los Altos is geographically situated adjacent to active earthquake faults capable of producing substantial seismic events. Since the City of Los Altos is divided by creeks, an expressway and other substantial traffic corridors, the occurrence of a major earthquake would significantly impact the ability of fire crews to respond to emergencies should one or more bridges collapse or be substantially damaged. In addition, fire suppression capabilities would be severely limited should the water system be extensively damaged during the seismic event. Therefore, mitigation measures are necessary such as: automatic fire suppression systems, communications systems, access to buildings, seismic protection, safety controls for hazardous materials and other safeguards in order to minimize the risks to citizens, firefighters and property due to the severity of the fire threat and potential response delays.

The below table provides the express findings and determinations (where necessary pursuant to California Health & Safety Code Sections 17958, 17958.7 and/or 18941.5) justifying the City of Los Altos’ amendmentsto the 2025 Edition of the California Fire Code as

Page 419 of 658 ends

reasonably necessary because of local climatic, geologic, or topographic conditions.

Admin = This amendment is necessary for administrative clarification and does not modify a building standard pursuant to California Health & Safety Code Sections 17958, 17958.7 and/or 18941.5. This amendment establishes administrative standards for the effective enforcement of the building standards in the City of Los Altos.

I = This amendment is reasonably necessary because of climatic conditions.

II = This amendment is reasonably necessary because of topographical conditions.

III = This amendment is reasonably necessary because of geological conditions.

Code Section California Fire Code Local Amendmen Findings 105.5.9 Permit Amounts for Compressed Gases Admin
105.5.22 Permit Amounts for Hazmat Admin
105.5.60 Institutions Admin
105.5.61 Residential Care Facility Admin
105.6.4 Cryogenic fluids I, II, & III
109.5 Final Inspection Admin
113.4 Violation penalties Admin
Chapter 2 Definitions Admin
503.1 Where required Admin
503.1.1 Buildings and facilities Admin
503.2.1 Dimensions Admin
503.2.4 Turning Radius Admin
503.2.7 Grade Admin
503.5 Required Gates or Barricades Admin
503.6 Security Gates Admin
504.5 Access control devices II & III
505.1 Address identification Admin
510.1 Emergency responder communication
coverage in new buildings
Admin
510.1.1 Obstruction by new buildings Admin
510.3 Permit required Admin
510.4 Technical requirements Admin
510.4.1.1 Minimum signal strength into the
building
Admin
510.4.1.2 Minimum signal strength out of the
building
Admin
510.5 Installation requirement Admin
510.5.1 Approval prior to installation Admin
510.5.3 Acceptance test procedure Admin

Page 420 of 658 ends

703.3 Fire-resistant penetrations and joints Admin
901.6.2 Integrated testing Admin
901.6.2.1 High-rise buildings Admin
901.6.3 Records Admin
903.2 Where required II & III
903.2.11.7 Chemical Fume Hood Fire Protection II & III
907.8 Inspection, Testing, & Maintenance Admin
909.22.1 Schedule Admin
1202.1 Definitions Admin
1207.1.7 Large-scale fire test Admin
1207.2.2.1 Ongoing inspection and testing Admin
1207.5.2 Maximum allowable quantities Admin
1207.5.5 Fire suppression systems III
1207.11.3 Location Admin
1207.11.6 Fire detection III
3303.5 Fire watch Admin
3303.7 Fire Walls II & III
3307.1.2 Stairways required Admin
3307.1.4 Required Means of Egress II & III
3307.6 Fire Department Access Roadways II & III
3313.1 Completion before occupancy Admin
4106.1 Immersion Heaters Admin
4103.1 Portable unvented heaters Admin
4103.1.2.1.1 Prohibited locations Admin
5001.2.2.2 Health Hazards Admin
5002.1 Definitions Admin
5003.1.3.1 Toxic, Highly Toxic, Moderately Toxic
Gases
III
5003.1.5 Health Hazards - Other III
5003.1.6 Additional Spill Control and Secondary
Containment Requirements
III
5003.2.2.1 Design and Construction III
5003.2.2.2 Additional Regulation for Supply Piping
for Health Hazard Materials
III
5003.5.2 Ventilation Ducting III
5003.5.3 “H" Occupancies III
5003.10.4. Elevators utilized to transport
hazardous materials
Admin
5004.2.1 Spill Control for Hazardous Material
Liquids
Admin
5004.2.2.2 Incompatible Materials Admin

Page 421 of 658 ends

5402.1 Definition Admin
5601.1.3 Fireworks Admin
5704.2.7.5.8 Overfill Prevention Admin
5704.2.7.5.9 Automatic Filling of Tanks Admin
5704.2.9.6.1 Locations where above-ground tanks ar
prohibited
Admin
5706.2.4.4 Locations where above-ground tanks ar
prohibited
Admin
5806.2 Limitations of cryogenic fluids Admin
6104.2 Maximum capacity within established
limits
Admin
6001.1 Scope Admin
6004.1 General Admin
6004.1.1 Special limitations for indoor storage
and
use by occupancy
Admin
6004.1.1.1 Group A, E, I or U occupancies Admin
6004.1.1.2 Group R occupancies Admin
6004.1.1.3 Offices, retail sales and classrooms Admin
6004.2 Indoor storage and use Admin
6004.2.1 Applicability Admin
6004.2.1.4 Quantities exceeding the minimum
threshold
Admin
6004.4 General indoor requirements Admin
6004.4.1 Cylinder and tank location Admin
6004.4.2 Ventilated areas Admin
6004.4.3 Piping and controls Admin
6004.4.4 Gas rooms Admin
6004.4.5 Treatment systems Admin
6004.4.5.1 Design Admin
6004.4.5.2 Performance Admin
6004.4.5.3 Sizing Admin
6004.4.5.4 Stationary tanks Admin
6004.4.5.5 Portable tanks and cylinders Admin
6004.4.6 Emergency power Admin
6004.4.6.1 Fail-safe systems Admin
6004.4.7 Automatic fire detection system Admin
6004.4.8 Gas detection system Admin
6004.4.8.1 Alarms Admin
6004.4.8.2 Shut off of gas supply Admin
6104.2 Maximum capacity within established Admin

Page 422 of 658 ends

limits
6405.3.1 Silane distribution systems automatic
shutdown
Admin
Section 12.22.020 Establishment and duties of the fire prevention division. a. The California Fire Code shall be enforced by the Santa Clara County Fire Department which shall be operated under the supervision of the Chief of the Fire Department. b. The City fire marshal shall be the chief of the fire prevention division and shall be appointed by the Chief of the Fire Department.
c. The Chief of the Fire Department may assign members of the fire department as deputy fire marshals as shall be necessary.

Section 12.22.080 Fire Code Amendments
The 2022 California Fire Code referred to in Section 12.24.010 is adopted with the following amendments and certain Appendix Chapters as follows:

Chapter 1 SCOPE AND ADMINISTRATION
Section 105 PERMITS
Table 105.5.9 is amended to read:

TABLE 105.5.9

PERMIT AMOUNTS FOR COMPRESSED GASES

TYPE OF GAS AMOUNT
(cubic feet at NTP)
Carbon dioxide used in carbon dioxide
enrichment systems
875 (100lb)
Carbon dioxide used in insulated liquid
carbon dioxide beverage dispensing
applications
875 (100 lb)
Corrosive 200
Flammable (except cryogenic fluids and
liquefied petroleum gases)
200
Highly toxic Any Amount
Moderately toxic Any Amount
Other Health Hazard Materials Any Amount
Inert and simple asphyxiant 6,000
Oxidizing (including oxygen) 504
Pyrophoric Any Amount
Toxic Any Amount
Table 105.5.22 is amended to read:

Page 423 of 658 ends

TABLE 105.5.22

PERMIT AMOUNTS FOR HAZARDOUS MATERIALS

TYPE OF MATERIAL AMOUNT
Combustible liquids See Section 105.5.18
Corrosive materials
Gases See Section 105.5.9
Liquids 55 gallons
Solids 500 pounds
Explosive materials See Section 105.5.16
Flammable materials
Gases See Section 105.5.9
Liquids See Section 105.5.18
Solids 100 pounds
Highly toxic materials
Gases See Section 105.5.9
Liquids Any Amount
Solids Any Amount
Moderately toxic materials
Gases See Section 105.5.9
Other health hazard materials
Gases See Section 105.5.9
Liquids 55 gallons
Solids 500 pounds
Oxidizing materials
Gases See Section 105.5.9
Liquids
Class 4 Any Amount
Class 3 1 gallona
Class 2 10 gallons
Class 1 55 gallons
Solids
Class 4 Any Amount
Class 3 10 poundsb
Class 2 100 pounds
Class 1 500 pounds
Organic peroxides
Liquids
Class I Any Amount
Class II Any Amount
Class III 1 gallon
Class IV 2 gallons
Class V No Permit Required
Solids
Class I Any Amount

Page 424 of 658 ends

Class II Any Amount
Class III 10 pounds
Class IV 20 pounds
Class V No Permit Required
Pyrophoric materials
Gases Any Amount
Liquids Any Amount
Solids Any Amount
Toxic materials
Gases See Section 105.5.9
Liquids 10 gallons
Solids 100 pounds
Unstable (reactive) materials
Liquids
Class 4 Any Amount
Class 3 Any Amount
Class 2 5 gallons
Class 1 10 gallons
Solids
Class 4 Any Amount
Class 3 Any Amount
Class 2 50 pounds
Class 1 100 pounds
Water-reactive materials
Liquids
Class 3 Any Amount
Class 2 5 gallons
Class 1 55 gallons
Solids
Class 3 Any Amount
Class 2 50 pounds
Class 1 500 pounds
For SI: 1 gallon = 3.785 L, 1 pound = 0.454 kg.
a. 22 gallons when Table 5003.1.1(1) Note k applies and hazard identification signs in accordance with Section 5003.5 are provided for quantities of 22 gallons or less. b. 220 pounds when Table 5003.1.1(1) Note k applies and hazard identification signs in accordance with Section 5003.5 are provided for quantities of 220 pounds or less.

Section 105.5.60 is added to read:

Page 425 of 658 ends

105.56.60 Institutions. An operational permit is required to operate any health facility as defined in Section 1250 of the California Health and Safety Code, with an occupant load of more than six (6) persons, or to operate any jail or facility where personal liberties of the occupants are restrained. See California Code of Regulations Title 24 Part 2.

Section 105.5.61 is added to read:
105.56.61 Residential care facility. An operational permit is required to operate any residential care or service facility, as described in the California Building Code, accommodating more than six (6) persons.

Section 105.6.4 is amended to read:
105.6.4 Cryogenic fluids. A construction permit is required for installation of or alteration to cryogenic fluid storage systems where the system capacity exceeds the amounts listed in Table 105.5.11. Maintenance performed in accordance with this code is not considered to be an alteration and does not require a construction permit.

Section 109 INSPECTIONS
Section 109.5 is added to read as follows:

Page 426 of 658 ends

Section 109.5 Final Inspection.

No final inspection as to all or any portion of a development shall be deemed completed until the installation of the required fire protection facilities and access ways have been completed and approved. No final certificate of occupancy may be granted until the Fire Department issues notice of final clearance of such fire protection facilities and access ways to the Building Division.

Section 113 VIOLATIONS
Section 113.4 is amended to read as follows:

Section 113.4 Violation penalties.

Violation penalties shall be in accordance with Title 1, Chapter 1.30 of the City of Los Altos Municipal Code.

Chapter 2 DEFINITIONS
Chapter 2 of the 2025 California Fire Code and 2024 International Fire Code is amended to include the following definitions:

CORROSIVE LIQUID. Corrosive liquid is:
1) any liquid which, when in contact with living tissue, will cause destruction or irreversible alteration of such tissue by chemical action; or
2) any liquid having a pH of 2 or less or 12.5 or more; or 3) any liquid classified as corrosive by the U.S. Department of Transportation; or any material exhibiting the characteristics of corrosivity in accordance with Title 22, California Code of Regulations §66261.22.

HEALTH HAZARD – OTHER. A hazardous material which affects target organs of the body, including but not limited to, those materials which produce liver damage, kidney damage, damage to the nervous system, act on the blood to decrease hemoglobin function, deprive the body tissue of oxygen or affect reproductive capabilities, including mutations (chromosomal damage), sensitizers or teratogens (effect on fetuses).

LARGE-SCALE FIRE TESTING. Testing a representative energy storage system that induces a significant fire into the device under test and evaluates whether the fire will spread to adjacent energy storage system units, surrounding equipment, or through an adjacent fireresistance-rated barrier.

Page 427 of 658 ends

MODERATELY TOXIC GAS. A chemical or substance that has a median lethal concentration (LC50) in air more than 2000 parts per million but not more than 5000 parts per million by volume of gas or vapor, when administered by continuous inhalation for an hour, or less if death occurs within one hour, to albino rats weighing between 200 and 300 grams each.

WORKSTATION. A defined space or an independent principal piece of equipment using flammable or unstable (Class 3 or 4 as ranked by NFPA 704) hazardous materials where a specific function, laboratory procedure or research activity occurs. Approved or listed hazardous materials storage cabinets, flammable liquid storage cabinets or gas cabinets serving a workstation are included as part of the workstation. A workstation is allowed to contain ventilation equipment, fire protection devices, detection devices, electrical devices and other processing and scientific equipment.

HEALTH HAZARD – OTHER. A hazardous material which affects target organs of the body, including but not limited to, those materials which produce liver damage, kidney damage, damage to the nervous system, act on the blood to decrease hemoglobin function, deprive the body tissue of oxygen or affect reproductive capabilities, including mutations (chromosomal damage), sensitizers or teratogens (effect on fetuses).

SPILL CONTROL. That level of containment that is external to and separate from the primary containment and is capable of safely and securely containing the contents of the largest container and prevents the materials from spreading to other parts of the room.

SECONDARY CONTAINMENT. Secondary containment is that level of containment that is external to and separate from primary containment and is capable of safely and securely containing the material, without discharge, for a period of time reasonably necessary to ensure detection and remedy of the primary containment failure.

Chapter 5 FIRE SERVICE FEATURES
Section 503 FIRE APPARATUS ACCESS ROADS
Section 503.1 Where required.

Section 503.1.1 Buildings and facilities. Section
503.2.1 Dimensions.

Section 503.2.4 Turning Radius Section
503.2.7 Grade
Section 503.5 Required Gates or Barricades Section
503.6 Security Gates
Section 503.1 is amended to read as follows:

Section 503.1 Where required. Fire apparatus access roads shall be provided and maintained in accordance with Sections 503.1.1 through 503.1.3 and in accordance with the fire department’s access standards.

Page 428 of 658 ends
← All documents from this meeting