AGENDA

CITY COUNCIL MEETING

CITY HALL COUNCIL CHAMBERS
520 J Street
Los Banos, California
SEPTEMBER 18, 2024 - 6:00 PM
Live stream on YouTube at:
........... https://www.youtube.com/@losbanos406 ..................................................... .

If you require special assistance to attend or participate in this meeting, please call the City Clerk's Office@ (209) 827-7000 at least 48 hours prior to the meeting.

The City of Los Banos complies with the Americans with Disabilities Act (ADA) of 1990. * * * * * * * ** * * * * * * *
Si requiere asistencia especial para atender o participar en esta junta par favor /lame a la oficina de la Secretaria de la ciudad al (209) 827-7000 a lo menos de 48 horas previas de la junta.

La Cuidad de Los Banos cumple con la Acta de Americanos con Deshabilidad (ADA) de 1990. · ....................................................................................................................... ···················•··•··········•········ ·································· ·······•· ········· .. -·-······························ ········•··· ............ .

Any writings or documents provided to a majority of the City Council regarding any item on this agenda will be made available for public inspection at the meeting and in the City Clerk's office located at City Hall, 520 J Street, Los Banos, California during normal business hours. In addition, such writings and documents may be posted on the City's website at www.losbanos.org.
* * * * * * * ** * * * * * * *
Cualquier escritura o los documentos proporcionaron a una mayoria de/ Ayuntamiento respecto a cualquier articulo en este orden de/ dia sera hecho disponible para la inspecci6n publica en la reunion y en la oficina de la Secretaria de la ciudad en City Hall, 520 J Street, Los Banos,
California durante horas de oficina normales. Ademas, tales escrituras y las documentos pueden ser anunciados en el website de la ciudad en www.losbanos.org.

Please note: The Brown Act provides the public with an opportunity to make public comment at any public meeting. As an alternative for in-person comments, written public comment may be made by e-mail to [email protected] or delivered to the City Clerk at City Hall, 520 J Street three (3) hours prior to the scheduled time of the meeting. Comments received will not be read aloud at the meeting, but shall be distributed to the City Council via e-mail and added to the agenda packet on the City's website for public review. Agenda packets can be found on the City's website at the foll9wing link: https://losbanos.org/category/city-council/ Los Banos City Council Agenda - September 18, 2024 Page 1 of 5 1 1. CALL TO ORDER -August 21 , 2024 6:00 PM

2. PLEDGE OF ALLEGIANCE.

3. ROLL CALL: (City Council Members)
Kenneth Lambert - District 1
Brett Jones - District 3
__ Douglas Begonia, Jr. - District 2
Deborah Lewis - District 4
__ Paul Llanez - Mayor

4. CONSIDERATION OF APPROVAL OF AGENDA.

Recommendation: Adopt the agenda as submitted.

5. PRESENTATION - Certificate of Recognition - Employee of the Month for August 2024 - Natasha Mora Miranda, Admin Clerk II in the Police Department.

6. PUBLIC FORUM. (Members of the public may address the City Council Members on any item of public interest that is within the jurisdiction of the City Council; includes agenda and non-agenda items. No action will be taken on non-agenda items. Speakers are limited to a five (5) minute presentation. Detailed guidelines are posted on the Council Chamber informational table.)

7. CONSIDERATION OF APPROVAL OF CONSENT AGENDA. (Items on the Consent Agenda are considered to be routine and will be voted on in one motion unless removed from the Consent Agenda by a City Council Member.) A. Check Register for #246940 - #247398 in the Amount of $3,663,789.28.

Recommendation: Approve the check register as submitted.

B. City Council Meeting Minutes for August 7, 2024.

Recommendation: Approve the minutes as submitted.

C. City Council Meeting Minutes for August 21, 2024.

Recommendation: Approve the minutes as submitted.

D. City Council Resolution No. 6825 - Authorizing the City Manager to Execute the Contract with Zoom Recreation for the Construction of Shade Structures in City Parks in the Amount of $173,997 and a Project Contingency of $26,003.

Recommendation: Adopt the resolution as submitted.

E. City Council Resolution No. 6826 - Authorizing the City Manager to Execute the Contract with Ronnys Inc. for the Construction of Sunrise Ranch Park in the Amount of $999,856.50 and a Project Contingency of $150,000.

Recommendation: Adopt the resolution as submitted.

Los Banos City Council Agenda - September 1 B, 2024 Page 2 of5 2 pgs. 7-8
pgs.9-16
pgs. 17-26
pgs. 27-32
pgs. 33-46
pgs. 47-66
F. City Council Resolution No. 6827 - Authorizing the City Manager to Execute the Contract with Ronnys Inc. for the Construction of the Community Center Perimeter Fence Project in the Amount of $144,741 and Project Contingency of $21,700.

Recommendation: Adopt the resolution as submitted.

G. City Council Resolution No. 6828 - Awarding the Bid for the Purchase of a New 2024 ¾ Ton Medium Duty Utility Truck with Lumber Rack to Santos Ford and Issue Purchase Order in the Amount of $66,896.26.

Recommendation: Adopt the resolution as submitted.

H. City Council Resolution No. 6829 - Awarding the Bid for the Purchase of a New 2024 ¾ Ton Medium Duty Utility Truck to Santos Ford and Issue Purchase Order in the Amount of $65,808.76.

Recommendation: Adopt the resolution as submitted.

I. City Council Resolution No. 6830 - Awarding the Bid for the Purchase of a New 2024 ½ Ton Truck with Lift Gate to Greenwood Chevrolet and Issue Purchase Order in the Amount of $49,553.62.

Recommendation: Adopt the resolution as submitted.

J. City Council Resolution No. 6831 - Awarding the Bid for the Purchase of a New 2024 Model SUV to Greenwood Chevrolet and Issue Purchase Order in the Amount of $42,214.73.

Recommendation: Adopt the resolution as submitted.

K. City Council Resolution No. 6832 - Awarding the Bid for the Purchase of a New 2023 Medium Duty Flatbed Truck to Greenwood Chevrolet and Issue Purchase Order in the Amount of $80,247.08.

Recommendation: Adopt the resolution as submitted.

L. City Council Resolution No. 6833 - Awarding the Bid for the Purchase of a Two (2) New 2024 ¾ Ton Medium Duty 4X4 Utility Trucks with Lift Gates to Greenwood Chevrolet and Issue Purchase Order in the Amount of $154,848.82.

Recommendation: Adopt the resolution as submitted.

M. City Council Resolution No. 6834 - Approving the Acceptance of a $48,050 Grant Awarded by the California Department of Alcohol Beverage Control Related to the Enforcement of Alcohol Related Crimes and Amending het Fiscal Year 2024-205 Budget by Increasing the Appropriation Amount for Expenditures and Revenues in the Amount of $48,050.

Recommendation: Adopt the resolution as submitted.

Los Banos City Council Agenda - September 18, 2024 Page 3of5 3 pgs. 67-80
pgs. 81-88
pgs. 89-98
pgs. 99-106
pgs. 107-116
pgs. 117-124
pgs.125-132
pgs. 133-136

8. PUBLIC HEARING. (If you challenge the proposed action as described herein in court, you may be limited to raising only those issues you or someone else raised at the public hearing described herein or in written correspondence delivered to the City at, or prior to, the public hearing.)
A. Public Hearing - To Receive Public Comment and Consideration Regarding the Proposal that the City of Los Banos Acting as the City of Los Banos Groundwater Sustainability Agency (GSA) Approve the Delta Mendota Subbasin (5-022.07), San Joaquin River Exchange Contractors GSP Group, Groundwater Sustainability Plan (GSP) as it Relates to the City of Los Banos GSA.
1) City Council Resolution No. 6835 - Acting as the City of Los Banos Groundwater Sustainability Agency (GSA) Approving the Groundwater Sustainability Plan for the San Joaquin River Exchange Contractors GSP Group in the Delta-Mendota Subbasin (5-022.07) Dated July 2024 as it Pertains to the City of Los Banos GSA.

Recommendation: Receive staff report, open public hearing, close the public hearing, and adopt the resolution as submitted.

9. COLORADO BALLPARK RENOVATION UPDATE.

Recommendation: Receive staff report and provide staff direction on how to proceed.

10. CANCELLATION OF THE REGULAR CITY COUNCIL MEETING SCHEDULED FOR WEDNESDAY, OCTOBER 16, 2024 DUE TO COUNCIL MEMBERS

ATTENDING THE LEAGUE OF CALIFORNIA CITIES CONFERENCE IN LONG BEACH, CALIFORNIA, OCTOBER 16-18, 2024.

Recommendation: Cancel the meeting as stated.

11. ADVISEMENT OF PUBLIC NOTICES. (No Report)
Recommendation: Informational item only, no action to be taken.

12. CITY MANAGER REPORT.

Recommendation: Informational item only, no action to be taken.

13. REPORT/UPDATE ON MERCED COUNTY ASSOCIATION OF GOVERNMENTS (MCAG), PENINSULA CLEAN ENERGY (PCE), MEASURE V COMMITTEE, AND

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (SJVAPCD), AND LOS BANOS DOWNTOWN PROPeRTY & BUSINESS IMPROVEMENT
DISTRICT (LBDPBID).

Recommendation: Informational item only, no action to be taken.

14. CITY COUNCIL MEMBER REPORTS.

A. Deborah Lewis - District 4
Los Banos City Council Agenda - September 18, 2024 Page 4 ofS 4 pgs. 137-168
pgs. 169-174
B. Kenneth Lambert - District 1
C. Douglas Begonia, Jr. - District 2
D. Brett Jones - District 3
E. Paul Llanez - Mayor

15. ADJOURNMENT.

I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the City Hall bulletin board not less than 72 hours prior to the meeting. ~~..,. ~
Lucille L. Mallonee City Clerk Dated this 13th day of September 2024 Los Banos City Council Agenda - September 18, 2024 Page 5 of5 5 THIS PAGE IS INTENTIONALLY LEFT BLANK
66 ITEM 5

CERTIFICATE OF RECOGNITION
<Presented' rfo
Natasha Mora Miranda

AD MIN CLERK II - POLICE DEPARTMENT
In recognition of your outstancfing petformance
and decficated service to tlie City of Los <Banos and
for 6eing named "r.Empfoyee of tlie <Jvlontli"for Jlugust 2024. <Pau{ £Canez, <Jvt.ayor
(J)atea: Septem6er 18, 2024
LOsBanos
At tl1c Cro~swatls of Ct1li(or11ia
7 THIS PAGE IS INTENTIONALLY LEFT BLANK
88 ITEM 7A
CK# 246940 - # 247398 09/18/2024 $3,663,789.28
Check Report LOs Banos
ff of
Check by Date
Check Number Payment Date Vendor Name Module Payment Type Payment Amount 246940 08/16/2024 Agile Occupational Medicine PC Accounts Payable Check 140.00 246941 08/16/2024 Hector Castillo Accounts Payable Check 2,153.00 246942 08/16/2024 CEP America California Accounts Payable Check 1,224.00 246943 08/16/2024 CSG Consultants Inc. Accounts Payable Check 60,499.70 246944 08/16/2024 City of Los Banos Utility Accounts Payable Check 61,385.98 246945 08/16/2024 Elk Grove Auto Group, Inc. Accounts Payable Check 287,300.32 246946 08/16/2024 Galvin Preservation Associates, Inc. Accounts Payable Check 10,413.29 246947 08/16/2024 Gouveia Engineering Inc. Accounts Payable Check 20,636.96 246948 08/16/2024 Grassland Water District Accounts Payable Check 86,342.00 246949 08/16/2024 Halcyon Creek Inc. Accounts Payable Check 68,412.63 246950 08/16/2024 Charles A. Edler Accounts Payable Check 872.00 246951 08/16/2024 Imagine Way More LLC Accounts Payable Check 7,500.00 246952 08/16/2024 Next Projection, LLC Accounts Payable Check 22,531.39 246953 08/16/2024 Phillip Ray Orabuena Accounts Payable Check 1,200.00 246954 08/16/2024 OpenGov, Inc Accounts Payable Check 132,053.09 246955 08/16/2024 PG&E Company Accounts Payable Check 262,208.35 246956 08/16/2024 Provost and Pritchard Engineering, Inc. Accounts Payable Check 12,013.04 246957 08/16/2024 Ronny's Inc. Accounts Payable Check 10,572.43 246958 08/16/2024 SHI International Corp Accounts Payable Check 6,066.32 246959 08/16/2024 Stantec Consulting Services, Inc. Accounts Payable Check 17,527.05 246960 08/16/2024 Superior Pool Products, LLC Accounts Payable Check 9,254.74 246961 08/16/2024 Stonefield Homes, Inc. Accounts Payable Check 477.02 246962 08/16/2024 Turlock Sheet Metal & Welding Inc. Accounts Payable Check 52,000.00 246963 08/16/2024 Tyler Technologies, Inc. Accounts Payable Check 26,278.75 246964 08/16/2024 Vanir Construction Management, Inc. Accounts Payable Check 28,000.00 246965 08/16/2024 Alhambra Accounts Payable Check 85.41 246966 08/16/2024 AAA Business Supplies Accounts Payable Check 63.64 246967 08/16/2024 American Ramp Company Accounts Payable Check 9,000.00 246968 08/16/2024 American Self Storage Accounts Payable Check 1,670.00 246969 08/16/2024 Amsoil Inc. Accounts Payable Check 3,361.72 246970 08/16/2024 Animal Damage Management, Inc. Accounts Payable Check 1,201.25 246971 08/16/2024 Anthony Gomes Accounts Payable Check 729.40 246972 08/16/2024 Apex Annex Health Center, Inc. Accounts Payable Check 501.00 246973 08/16/2024 Aramark Uniform Ser Inc Accounts Payable Check 1,124.69 246974 08/16/2024 AT&T Mobility Accounts Payable Check 5,728.73 246975 08/16/2024 AT&T Accounts Payable Check 2,967.43
246976 08/16/2024 Backflow Apparatus & Valve Co. Accounts Payable Check 972.16 246977 08/16/2024 Dorothy June Baker Accounts Payable Check 21.74 246978 08/16/2024 Bel korp Ag, LLC Accounts Payable Check 610.94 246979 08/16/2024 Beacon Athletics LLC Accounts Payable Check 1,357.22 246980 08/16/2024 Richard A Blak Phd Accounts Payable Check 1,860.00 246981 08/16/2024 Boot Barn Accounts Payable Check 137.01 246982 08/16/2024 Stericycle Inc Accounts Payable Check 231.22 246983 08/16/2024 Bruce's Tire Inc Accounts Payable Check 872.61 246984 08/16/2024 BSK Associates Accounts Payable Check 2,482.22 246985 08/16/2024 Ca Dept of Justice Cashiering Unit Accounts Payable Check 1,723.00 246986 08/16/2024 Cal Mat Co. Accounts Payable Check 355.17 9 246987 08/16/2024 Cal Traffic Accounts Payable Check 2,214.10 246988 08/16/2024 Cintas Corporation No.2 Accounts Payable Check 946.79 246989 08/16/2024 ControlPoint Engineering, Inc. Accounts Payable Check 2,660.00 246990 08/16/2024 Central Sanitary Supply, LLC Accounts Payable Check 268.28 246991 08/16/2024 Clark Pest Control Inc Accounts Payable Check 114.00 246992 08/16/2024 Cook's Communications Corp. Accounts Payable Check 480.00 246993 08/16/2024 Copy Shipping Solutions Accounts Payable Check 130.42 246994 08/16/2024 CSFEWBC-VLSA Accounts Payable Check 4,100.00 246995 08/16/2024 CSG Consultants Inc. Accounts Payable Check 690.00 246996 08/16/2024 De Lage Landen Public Finance LLC Accounts Payable Check 2,788.59 246997 08/16/2024 Dos Palos Publishing Company Accounts Payable Check 497.00 246998 08/16/2024 Duncan Printing Co. Inc. Accounts Payable Check 784.75 246999 08/16/2024 Econolite Control Products, Inc. Accounts Payable Check 2,614.75 247000 08/16/2024 Electric Drives Inc Accounts Payable Check 2,186.93 247001 08/16/2024 Farmer Brothers Coffee Accounts Payable Check 234.11 247002 08/16/2024 Fast Track Car Wash Accounts Payable Check 441.00 247003 08/16/2024 Federal Express Corporation Accounts Payable Check 26.77 247004 08/16/2024 Ivan Avila Garcia Accounts Payable Check 3,727.13 247005 08/16/2024 GoTo Communications, Inc. Accounts Payable Check 3,817.19 247006 08/16/2024 Gouveia Engineering Inc. Accounts Payable Check 7,190.28 247007 08/16/2024 Green Pro Solutions Accounts Payable Check 2,645.90 247008 08/16/2024 Hoffman Electronic Systems Accounts Payable Check 220.00 247009 08/16/2024 Holt of California Accounts Payable Check 480.99 247010 08/16/2024 Home Depot Accounts Payable Check 7,054.14 247013 08/16/2024 Don Hughes Photography Accounts Payable Check 304.50 247014 08/16/2024 IDM Worldwide Accounts Payable Check 362.52 247015 08/16/2024 Jerry Witt Accounts Payable Check 2,389.00 247016 08/16/2024 J.J.R. Enterprises Inc. Accounts Payable Check 1,059.32 247017 08/16/2024 Jorgensen & Sons Inc. Accounts Payable Check 504.02 247018 08/16/2024 Krazan & Associates Accounts Payable Check 1,256.25 247019 08/16/2024 Marfab Inc Accounts Payable Check 13.17 247020 08/16/2024 Max's Mobile Truck Repair Accounts Payable Check 730.00 247021 08/16/2024 McCrometer Inc. Accounts Payable Check 1,711.75 247022 08/16/2024 Merced Chevrolet Inc. Accounts Payable Check 463.26 247023 08/16/2024 Merced Truck & Trailer Inc Accounts Payable Check 944.51 247024 08/16/2024 Monterey Auto Services Inc. Accounts Payable Check 262.50 247025 08/16/2024 NDN International LLC Accounts Payable Check 3,091.22 247026 08/16/2024 Normac Inc Accounts Payable Check 485.47 247027 08/16/2024 Northern California Regional Public Safety Training Authority Accounts Payable Check 1,000.00 247028 08/16/2024 OSE Accounts Payable Check 39.12
247029 08/16/2024 O'Reilly Auto Parts Accounts Payable Check 1,300.01 247030 08/16/2024 Pace Supply Corp. Accounts Payable Check 2,317.33 247031 08/16/2024 Precision Civil Engineering, Inc Accounts Payable Check 5,170.00 247032 08/16/2024 Provost and Pritchard Engineering, Inc. Accounts Payable Check 1,919.00 247033 08/16/2024 Purchase Power Inc Accounts Payable Check 299.28 247034 08/16/2024 Protech Security & Electronics, Inc. Accounts Payable Check 135.00 247035 08/16/2024 Quad Knopf, Inc. Accounts Payable Check 214.50 247036 08/16/2024 RMGY Inc. Accounts Payable Check 258.96 247037 08/16/2024 Andrew Romero Accounts Payable Check 50.00 247038 08/16/2024 Save Mart Supermarkets Accounts Payable Check 37.75 247039 08/16/2024 Sherwin Williams Co Accounts Payable Check 200.31 247040 08/16/2024 SIJ Holdings, Inc Accounts Payable Check 1,311.92 247041 08/16/2024 Frank Silveria Accounts Payable Check 1,340.00 247042 08/16/2024 Sorensens True Value Accounts Payable Check 1,508.27 247044 08/16/2024 Tractor Supply Credit Plan Accounts Payable Check 1,767.80 247045 08/16/2024 Triangle Rock Products Accounts Payable Check 466.34 247046 08/16/2024 Tyler Technologies, Inc. Accounts Payable Check 1,885.00 247047 08/16/2024 United Site Services, Inc. Accounts Payable Check 810.42 10 247048 08/16/2024 USA Blue Book Accounts Payable Check 2,143.36 247049 08/16/2024 Vestis Group, Inc. Accounts Payable Check 954.16 247050 08/16/2024 Vestis Accounts Payable Check 193.81
247051 08/16/2024 Verizon Wireless Accounts Payable Check 1,926.74 247052 08/16/2024 VFW & American Legion Accounts Payable Check 750.00 247053 08/16/2024 Westside Veterinary Service, Inc. Accounts Payable Check 347.67 247054 08/16/2024 Westside Water Conditioning Accounts Payable Check 193.50 247055 08/16/2024 West Publishing Corporation Accounts Payable Check 466.85 247056 08/16/2024 Windecker Inc Accounts Payable Check 9,977 .03
247057 08/16/2024 Xerox Financial Services Accounts Payable Check 2,464.46 247058 08/16/2024 Ancelmo and Mariluz Machado Utility Billing Check 63.96 247059 08/16/2024 Theresa Daudney Utility Billing Check 178.30 247060 08/16/2024 Antonio Perez-Lopez Utility Billing Check 143.94 247061 08/16/2024 Ma Carmen Licea Lopez Utility Billing Check 43.40 247062 08/16/2024 MHP Builders Inc Utility Billing Check 24.55 247063 08/16/2024 UC Construction Utility Billing Check 73.95 247064 08/16/2024 UC Construction Utility Billing Check 49.25 247065 08/16/2024 UC Construction Utility Billing Check 34.05 247066 08/16/2024 UC Construction Utility Billing Check 49.25 247067 08/16/2024 Yesenia Paredes Utility Billing Check 68 .24
247068 08/16/2024 Matthew Trimble Utility Billing Check 98 .44
247069 08/16/2024 MHP Builders Inc Utility Billing Check 24.55 247070 08/16/2024 D.R. Horton Utility Billing Check 28.23 247071 08/16/2024 D.R. Horton Utility Billing Check 28
.23
247072 08/16/2024 D.R. Horton Utility Billing Check 28.23 247073 08/16/2024 D.R. Horton Utility Billing Check 28.23 247074 08/16/2024 D.R. Horton Utility Billing Check 28
.23
247075 08/16/2024 D.R. Horton Utility Billing Check 28.23 247076 08/16/2024 D.R. Horton Utility Billing Check 28.23 247077 08/16/2024 D.R. Horton Utility Billing Check 28
.23
247078 08/16/2024 D.R. Horton Utility Billing Check 28.23 247079 08/16/2024 Home Sweet Home Property Management Co. Utility Billing Check 170 .34
247080 08/16/2024 D.R. Horton Utility Billing Check 169.18 247081 08/16/2024 Allison Christine Aguilar Utility Billing Check 83.52 247082 08/16/2024 Modesta Rosas Utility Billing Check 21.27 247083 08/16/2024 Seth Steber Utility Billing Check 95.53 247084 08/16/2024 UC Construction Utility Billing Check 160.85 247085 08/16/2024 D.R. Horton Utility Billing Check 155.99 247086 08/16/2024 UC Construction Utility Billing Check 133.40 247087 08/16/2024 UC Construction Utility Billing Check 97.30 247088 08/16/2024 D.R. Horton Utility Billing Check 155 .99
247093 08/20/2024 Aflac-Cu
stomer Service Accounts Payable Check 186.93
247094 08/20/2024 AFSCME District Council 57 Accounts Payable Check 1,509 .67
247095 08/20/2024 Empower Annuity Ins. Co of America Accounts Payable Check 1,550.37
247096 08/20/2024 Empower Annuity Ins. Co of America Accounts Payable Check 2,997 .00
247097 08/20/2024 Los Banos Fitness & Racquet Club Accounts Payable Check 265.00 247098 08/20/2024 Los Banos Police Assn Accounts Payable Check 980.00 247099 08/20/2024 Los Banos Police Assn. Accounts Payable Check 280.00 247100 08/20/2024 Merced County Sheriff Accounts Payable Check 200.00 247101 08/20/2024 Merced County Sheriff Accounts Payable Check 171.63 247102 08/20/2024 MissionSquare Accounts Payable Check 841.65 247103 08/20/2024 MissionSquare Accounts Payable Check 7,425 .00
247104 08/20/2024 Nationwide Retirement Solutions Accounts Payable Check 4,403.66 247105 08/20/2024 Professional Fire Fighter of Los Banos Local 4703 Accounts Payable Check 1,125.00 247106 08/20/2024 State Disbursement Unit Accounts Payable Check 1,100.00 247107 08/20/2024 AFSCME District Council 57 Accounts Payable Check 32.57 247108 08/20/2024 MissionSquare Accounts Payable Check 150 .00
247110 08/23/2024 Agile Occupational Medicine PC Accounts Payable Check 2,620.60 11 247111 08/23/2024 David Darren Cole II Accounts Payable Check 86.00 247112 08/23/2024 Ashley Greco Accounts Payable Check 215 .00
247113 08/23/2024 Liebert Cas
sidy Whitmore Accounts Payable Check 18
,290.50
247114 08/23/2024 Ricardo Monay Accounts Payable Check 100.00 247115 08/23/2024 Chetna Patel Accounts Payable Check 215.00 247116 08/23/2024 Stonefield Homes, Inc. Accounts Payable Check 825.75 247117 08/23/2024 Law Offices of William A Vaughn Accounts Payable Check 16 ,729.50
247119 08/23/2024 Amsoil Inc. Accounts Payable Check 5,042.59 247120 08/23/2024 Anthony Gomes Accounts Payable Check 914.00 247121 08/23/2024 Apex Annex Health Center, Inc. Accounts Payable Check 45 .00
247122 08/23/2024 AT&T Accounts Payable Check 2,417
.35
247123 08/23/2024 Anderson Homes Accounts Payable Check 348 .73
247124 08/23/2024 Dorothy June Baker Accounts Payable Check 1,169.52 247125 08/23/2024 Richard A Blak Phd Accounts Payable Check 465.00 247126 08/23/2024 Boot Barn Accounts Payable Check 171
.27
247127 08/23/2024 Bound Tree medical LLC Accounts Payable Check 127.22 247128 08/23/2024 Bruce's Tire Inc Accounts Payable Check 1,436.95 247129 08/23/2024 BWR Tools LLC Accounts Payable Check 108.21 247130 08/23/2024 Bottom Line Construction Managementy Inc. Accounts Payable Check 884.59 247131 08/23/2024 CALED Accounts Payable Check 800.00
247132 08/23/2024 Central Sanitary Supply, LLC Accounts Payable Check 1,309.77 247133 08/23/2024 Comcast Accounts Payable Check 208
.98
247134 08/23/2024 Cook's Communications Corp. Accounts Payable Check 601.56 247135 08/23/2024 Copy Shipping Solutions Accounts Payable Check 50.01 247136 08/23/2024 CPRS Accounts Payable Check 3,800.00
247137 08/23/2024 Kathryn A Curtice Accounts Payable Check 2,100.00 247138 08/23/2024 Econolite Control Products, Inc. Accounts Payable Check 2,260.00 247139 08/23/2024 Fast Track Car Wash Accounts Payable Check 584.50 247140 08/23/2024 Anabel Gomez Accounts Payable Check 600.00 247141 08/23/2024 Holt of California Accounts Payable Check 293.37 247142 08/23/2024 ICF Sacramento Accounts Payable Check 500.00 247143 08/23/2024 Kalmikov Enterprises, Inc Accounts Payable Check 201 .66
247144 08/23/2024 Kimball Midwest Accounts Payable Check 97 .02
247145 08/23/2024 Laboratory Corporation of America Holdings Accounts Payable Check 283 .50
247146 08/23/2024 Deborah Lewis Accounts Payable Check 80.00 247147 08/23/2024 Life Line Screening of America Accounts Payable Check 600.00 247148 08/23/2024 Refugio Llamas Accounts Payable Check 80.00 247149 08/23/2024 Tires to you Inc Accounts Payable Check 3,666.51
2471SO 08/23/2024 Marfab Inc Accounts Payable Check 689.68 247151 08/23/2024 Matson Alarm Co Inc Accounts Payable Check 215.00 247152 08/23/2024 Merced Chevrolet Inc. Accounts Payable Check 2,684.00
247153 08/23/2024 Merced Truck & Trailer Inc Accounts Payable Check 598.97 247154 08/23/2024 Alfonso Meza Accounts Payable Check
1,890.00
247155 08/23/2024 Mid-Valley Disposal LLC Accounts Payable Check 3,350.00 247156 08/23/2024 Municipal Maintenance Equipment, Inc. Accounts Payable Check 3,185.49 247157 08/23/2024 OSE Accounts Payable Check 28.25
247158 08/23/2024 O'Reilly Auto Parts Accounts Payable Check 524.61 247159 08/23/2024 PG&E Company Accounts Payable Check 10.44 247160 08/23/2024 Phoenix Group Information Systems Accounts Payable Check 2,302.40 247161 08/23/2024 Save Mart Supermarkets Accounts Payable Check 171.27 247162 08/23/2024 SIJ Holdings, Inc Accounts Payable Check 831.54 247163 08/23/2024 Sorensens True Value Accounts Payable Check 327 .70
247164 08/23/2024 Daniel Salazar Accounts Payable Check 500 .00
247165 08/23/2024 Terryberry Company LLC Accounts Payable Check 123 .34
247166 08/23/2024 The Heil CO Accounts Payable Check 220.00 247167 08/23/2024 The Active Network, Inc Accounts Payable Check 750.00 247168 08/23/2024 Triangle Rock Products Accounts Payable Check 1,405.38 247169 08/23/2024 Taylor Backhoe Service, Inc. Accounts Payable Check 886 .33
12 247170 08/23/2024 Vestis Group, Inc. Accounts Payable Check 160.34 247171 08/23/2024 Vestis Accounts Payable Check 193
.81
247172 08/23/2024 Verizon Wireless Accounts Payable Check 569.04 247173 08/23/2024 Windecker Inc Accounts Payable Check 4,119.28 247174 08/23/2024 Ling Guo Utility Billing Check 63.49
247175 08/23/2024 Peter Robert Noriega Utility Billing Check 54.50 247176 08/23/2024 Rachel Calderon Utility Billing Check 117.47 247177 08/23/2024 Rigoberto Rocha Utility Billing Check 36.19 247178 08/23/2024 D.R. Horton Utility Billing Check 163.08 247179 08/23/2024 D.R. Horton Utility Billing Check 163.86 247180 08/23/2024 Alberto Valdez Utility Billing Check 101.01 247181 08/23/2024 David Michael Wallace Utility Billing Check 112.25 247182 08/23/2024 Angela Withrow Utility Billing Check 107.70 247183 08/23/2024 Mark Perez Utility Billing Check 115.50 247184 08/23/2024 MHP Builders Inc Utility Billing Check 178 .79
247185 08/23/2024 UC Construction Utility Billing Check 152.25 247186 08/23/2024 RBG Construction Utility Billing Check 179.57 247187 08/23/2024 D.R. Horton Utility Billing Check 151.88 247188 08/23/2024 D.R. Horton Utility Billing Check 151.88 247189 08/23/2024 D.R. Horton Utility Billing Check 154.24 247190 08/23/2024 Ricky Rochin Utility Billing Check 105 .75
247199 08/26/2024 Ascent Aviation Group, Inc. Accounts Payable Check 44,852 .18
247200 08/26/2024 BSK Associates Accounts Payable Check 5,054.75 247201 08/26/2024 Carollo Inc. Accounts Payable Check 16 ,492.75
247202 08/26/2024 Fields Outdoor Adventures LLP Accounts Payable Check 16,980.00 247203 08/26/2024 Gallagher Benefit Services, Inc. Accounts Payable Check 6,250.00 247204 08/26/2024 Brent Kuhn Accounts Payable Check 14,685.00 247205 08/26/2024 Los Banos Downtown Assoc. Accounts Payable Check 25,375.81 247206 08/26/2024 Los Banos Veterinary Services Accounts Payable Check 5,012 .58
247207 08/26/2024 Pioneer Development Company, Inc. Accounts Payable Check 446,294 .26
247208 08/26/2024 Santos Ford Inc. Accounts Payable Check 36,404.49 247209 08/26/2024 Triangle Rock Products Accounts Payable Check 15 ,707.36
247210 08/26/2024 Varsity Scoreboards Accounts Payable Check 16,317 .94
247211 08/26/2024 Westamerica Bank
- Cafeteria Plan Accounts Payable Check 91,999.02
247212 08/26/2024 Williams Scotsman, Inc. Accounts Payable Check 7,966.21 247213 08/26/2024 Windecker Inc Accounts Payable Check 24,971.01 247214 08/27/2024 Erika Araceli Chavez Accounts Payable Check 23,795.37 247216 08/30/2024 Apex Annex Health Center, Inc. Accounts Payable Check 496.00 247217 08/30/2024 AT&T Mobility Accounts Payable Check 5,085.51 247218 08/30/2024 Central Valley Cardiovascular Group Inc. Accounts Payable Check 200 .00
247219 08/30/2024 Gisela Camarena Accounts Payable Check 350.00 247220 08/30/2024 Eric Gallichio Accounts Payable Check 431 .09
247221 08/30/2024 Surina Gonzales Accounts Payable Check 129 .00
247222 08/30/2024 Surina Gonzales Accounts Payable Check 117 .41
247223 08/30/2024 Ricardo Heredia Accounts Payable Check 172.00 247224 08/30/2024 Jennifer Loa Accounts Payable Check 15 .00
247225 08/30/2024 Christy McCammond Accounts Payable Check 63.65 247226 08/30/2024 Ramon McDonald Accounts Payable Check 172.00 247227 08/30/2024 Gerald "Obie" O'Brien Accounts Payable Check 77.14 247228 08/30/2024 Chetna Patel Accounts Payable Check 129.00 247229 08/30/2024 Teresa Provencio Accounts Payable Check 129 .00
247230 08/30/2024 Juan Soriano Accounts Payable Check 172 .00
247231 08/30/2024 Law Offices of William A Vaughn Accounts Payable Check 12 ,600.00
247232 08/30/2024 April Vieira Accounts Payable Check 172.00 247233 08/30/2024 Animal Damage Management, Inc. Accounts Payable Check 2,985.00
247235 08/30/2024 Anthem Sports, LLC Accounts Payable Check 3,811.22
247236 08/30/2024 AT&T Accounts Payable Check 882.37
247237 08/30/2024 Beacon Athletics LLC Accounts Payable Check 959.19 13 247238 08/30/2024 Beam Insurance Administrators LLC Accounts Payable Check 21,142 .53
247239 08/30/2024 Boot Barn Accounts Payable Check 171
.27
247240 08/30/2024 Stericycle Inc Accounts Payable Check 660 .60
247241 08/30/2024 BSK Associates Accounts Payable Check 1,977.60 247242 08/30/2024 Callander Associates Landscape Architecture, Inc. Accounts Payable Check 4,414 .95
247243 08/30/2024 CENCAL Machine & Fabrication Inc. Accounts Payable Check 14.66 247244 08/30/2024 Central Sanitary Supply, LLC Accounts Payable Check 161.96 247245 08/30/2024 Central Valley Concrete Inc. Accounts Payable Check 2,964.52
247246 08/30/2024 Comcast Accounts Payable Check 382
.92
247247 08/30/2024 CPS Accounts Payable Check 462
.00
247248 08/30/2024 LN Curtis & Sons Accounts Payable Check 695.54 247249 08/30/2024 Dos Palos Publishing Company Accounts Payable Check 160 .00
247250 08/30/2024 F S Rod Inc Accounts Payable Check
4,640.00
247251 08/30/2024 4imprint, Inc. Accounts Payable Check 881.02 247252 08/30/2024 Fast Track Car Wash Accounts Payable Check 3.50 247253 08/30/2024 Federal Express Corporation Accounts Payable Check 32 .70
247254 08/30/2024 Frasier Irrigation a Div. of Landmark Irrigation Accounts Payable Check 2,173.62 247255 08/30/2024 Hillyard, Inc Accounts Payable Check 106.35 247256 08/30/2024 Holt of California Accounts Payable Check 836.27 247257 08/30/2024 Maribel Huizar Accounts Payable Check 500.00 247258 08/30/2024 Jorgensen & Sons Inc. Accounts Payable Check 510.88 247259 08/30/2024 Amy Kuo Accounts Payable Check 600
.00
247260 08/30/2024 Los Banos
Veterinary Services Accounts Payable Check 2,346.81
247261 08/30/2024 Cesar Lopez Accounts Payable Check 50 .00
247262 08/30/2024 Tires to you Inc Accounts Payable Check 281.71 247263 08/30/2024 Marfab Inc Accounts Payable Check 586 .67
247264 08/30/2024 Merced Chevrolet Inc. Accounts Payable Check 165.63 247265 08/30/2024 Merced Community College Accounts Payable Check 50 .00
247266 08/30/2024 Merced Truck & Trailer Inc Accounts Payable Check 599.35 247267 08/30/2024 Mid-Valley Disposal LLC Accounts Payable Check 3,102.36 247268 08/30/2024 Moody
's Investors Service Inc. Accounts Payable Check 3,000.00 247269 08/30/2024 NDN Internat
ional LLC Accounts Payable Check 1,030.46
247270 08/30/2024 Net World Sports LTD Accounts Payable Check 1,569.98
247271 08/30/2024 O'Dell En
gineering Accounts Payable Check 5,672.50
247272 08/30/2024 O'Reilly Auto Parts Accounts Payable Check 978.24 247273 08/30/2024 Pace Supply Corp. Accounts Payable Check 1,031.94
247274 08/30/2024 Pitney Bowes Inc Accounts Payable Check 697.94 247275 08/30/2024 Pitney Bowes Inc Accounts Payable Check 144.41 247276 08/30/2024 Purchase Power Inc Accounts Payable Check 3,045.00
247277 08/30/2024 Reliance Standard Life Insurance Company Accounts Payable Check 6,152.23 247280 08/30/2024 RMGY Inc. Accounts Payable Check 149.46 247281 08/30/2024 Ronny's Inc. Accounts Payable Check
7,750.00
247282 08/30/2024 Ya net
Reyes Accounts Payable Check 350.00
247283 08/30/2024 Safe T Lite of Mode
sto, Inc. Accounts Payable Check
6,612.94
247284 08/30/2024 Jaime Alejandro Santana Accounts Payable Check 3,150.00 247285 08/30/2024 Save Mart Supermarkets Accounts Payable Check 143.30 247286 08/30/2024 Sherwin Williams Co Accounts Payable Check 175 .58
247287 08/30/2024 Sorensens True Value Accounts Payable Check 968.37 247289 08/30/2024 Laura Sanchez Accounts Payable Check 350 .00
247290 08/30/2024 San Joaquin
Asparagus Festival Accounts Payable Check 350
.00
247291 08/30/2024 CalMat Co. Accounts Payable Check 320.71 247292 08/30/2024 Tyler Technologies, Inc. Accounts Payable Check 1,644.00 247293 08/30/2024 Estela Ti
scareno Accounts Payable Check 50.00
247294 08/30/2024 United Rentals (North America}, Inc. Accounts Payable Check 5,281.13 247295 08/30/2024 Vanir Construction Management, Inc. Accounts Payable Check 300.00 247296 08/30/2024 Vestis Group, Inc. Accounts Payable Check 1,082 .29
247297 08/30/2024 Vestis Accounts Payable Check 193.81
247298 08/30/2024 Verizon Wir
eless Accounts Payable Check 225.70
14 247299 08/30/2024 Windecker Inc Accounts Payable Check 1,365.14 247306 09/05/2024 Aflac-Customer Service Accounts Payable Check 186.93 247307 09/05/2024 AFSCME District Council 57 Accounts Payable Check 1,508.01 247308 09/05/2024 Empower Annuity Ins. Co of America Accounts Payable Check 1,190.33 247309 09/05/2024 Empower Annuity Ins. Co of America Accounts Payable Check 2,997.00 247310 09/05/2024 Los Banos Police Assn Accounts Payable Check 980.00 247311 09/05/2024 Los Banos Police Assn. Accounts Payable Check 280.00 247312 09/05/2024 Merced County Sheriff Accounts Payable Check 200.00 247313 09/05/2024 MissionSquare Accounts Payable Check 550.00 247314 09/05/2024 MissionSquare Accounts Payable Check 10,125.00 247315 09/05/2024 Nationwide Retirement Solutions Accounts Payable Check 4,694.99 247316 09/05/2024 Professional Fire Fighter of Los Banos Local 4703 Accounts Payable Check 733.28 247317 09/05/2024 State Disbursement Unit Accounts Payable Check 1,183.50 247318 09/06/2024 Acavati LLC Accounts Payable Check 12,190.84 247319 09/06/2024 APC Equipment & Mfg. Inc. Accounts Payable Check 8,622.30 247320 09/06/2024 Apex Annex Health Center, Inc. Accounts Payable Check 443.00 247321 09/06/2024 Sara Blevins Accounts Payable Check 488.75 247322 09/06/2024 BMY Construction Group, Inc Accounts Payable Check 161,310.00 247323 09/06/2024 Dan Bronson Accounts Payable Check 150.00 247324 09/06/2024 Callander Associates Landscape Architecture, Inc. Accounts Payable Check 52,808.72 247325 09/06/2024 City of Los Banos Utility Accounts Payable Check 74,589.36 247326 09/06/2024 Dave Bang Associates, Inc. Of California Accounts Payable Check 6,816.91 247327 09/06/2024 Halcyon Creek Inc. Accounts Payable Check 17,402.56 247328 09/06/2024 Imagine Way More LLC Accounts Payable Check 7,500.00 247329 09/06/2024 Industrial Door Company, LLC Accounts Payable Check 7,804.38 247330 09/06/2024 Instrument Technology Corporation Accounts Payable Check 14,446.35 247331 09/06/2024 Brent Kuhn Accounts Payable Check 14,850.00 247332 09/06/2024 Liebert Cassidy Whitmore Accounts Payable Check 5,400.50 247333 09/06/2024 Mark Thomas & company. Inc. Accounts Payable Check 59,187.15 247334 09/06/2024 McElvany Inc Accounts Payable Check 139,219.92 247335 09/06/2024 Merced MRI Medical Group Accounts Payable Check 65.00 247336 09/06/2024 Merced Truck & Trailer Inc Accounts Payable Check 6,362.62 247337 09/06/2024 Mid-Valley Disposal LLC Accounts Payable Check 296,275.60 247338 09/06/2024 Miguel A Morales Accounts Payable Check 3,150.00 247339 09/06/2024 Municipal Maintenance Equipment, Inc. Accounts Payable Check 5,603.60 247340 09/06/2024 OCV, LLC Accounts Payable Check 8,990.00 247341 09/06/2024 O'Dell Engineering Accounts Payable Check 9,036.25 247342 09/06/2024 PG&E Company Accounts Payable Check 33,142.00 247343 09/06/2024 Ranchwood Homes Accounts Payable Check 35,134.78 247344 09/06/2024 Ronny's Inc. Accounts Payable Check 30,500.00 247345 09/06/2024 Spay Neuter Imperative Project California Accounts Payable Check 16,000.00 247346 09/06/2024 Stommel, Inc. Accounts Payable Check 38,924.48 247347 09/06/2024 Tri-County Flooring Inc. Accounts Payable Check 21,988.97 247348 09/06/2024 Turlock Sheet Metal & Welding Inc. Accounts Payable Check 62,187.32 247349 09/06/2024 Law Offices of William A Vaughn Accounts Payable Check 15,215.58 247350 09/06/2024 Windecker Inc Accounts Payable Check 22,893.66 247351 09/06/2024 Animal Damage Management, Inc. Accounts Payable Check 735.00 247352 09/06/2024 Dorothy June Baker Accounts Payable Check 761.17 247353 09/06/2024 Challenger Teamwear Accounts Payable Check 982.67 247354 09/06/2024 Justin Chuvichien Accounts Payable Check 750.00 247355 09/06/2024 City Signs Accounts Payable Check 4,400.00 247356 09/06/2024 Central Sanitary Supply, LLC Accounts Payable Check 65.48 247357 09/06/2024 Lamar A. Cummings Accounts Payable Check 595.00 247358 09/06/2024 Dos Palos Publishing Company Accounts Payable Check 110.00 247359 09/06/2024 Natalie Estrada Accounts Payable Check 350.00 247360 09/06/2024 Fastenal Company Accounts Payable Check 91.53 247361 09/06/2024 Blanca E. Gomez Accounts Payable Check 250.00 247362 09/06/2024 Hillyard, Inc Accounts Payable Check 1,049.84 15 247363 09/06/2024 Lexipol LLC Accounts Payable Check 3,545.40 247364 09/06/2024 Los Banos Veterinary Services Accounts Payable Check 3,933.02 247365 09/06/2024 Scott Leer Accounts Payable Check 350.00 247366 09/06/2024 Tires to you Inc Accounts Payable Check 12,470.19 247368 09/06/2024 Merced Chevrolet Inc. Accounts Payable Check 3,497.48 247369 09/06/2024 Merced Truck & Trailer Inc Accounts Payable Check 1,276.71 247370 09/06/2024 OSE Accounts Payable Check 105.78
247371 09/06/2024 O'Reilly Auto Parts Accounts Payable Check 2,290.85 247373 09/06/2024 PG&E Company Accounts Payable Check 180.74 247374 09/06/2024 Pacific Landscape Supply, Inc. Accounts Payable Check 6,804.00 247375 09/06/2024 Gabriela V. Puga Accounts Payable Check 350.00 247376 09/06/2024 Razzari Dodge Chrysler Jeep Accounts Payable Check 176.88 247377 09/06/2024 Razzari Ford Accounts Payable Check 816.92 247378 09/06/2024 Jose L. Rodriguez Accounts Payable Check 600.00 247379 09/06/2024 Safe T Lite of Modesto, Inc. Accounts Payable Check 1,172.11 247380 09/06/2024 Save Mart Supermarkets Accounts Payable Check 39.79 247381 09/06/2024 Sherwin Williams Co Accounts Payable Check 1,443.28 247382 09/06/2024 Robert & Susan Hansen Accounts Payable Check 573.06 247383 09/06/2024 Sorensens True Value Accounts Payable Check 103.94 247384 09/06/2024 TargetSolutions Learning LLC Accounts Payable Check 2,000.00 247385 09/06/2024 Terminix Processing Center Accounts Payable Check 53.00 247386 09/06/2024 The Heil CO Accounts Payable Check 2,341.00 247387 09/06/2024 The Sidwell Company Accounts Payable Check 2,400.00 247388 09/06/2024 Samantha Alison Tova Accounts Payable Check 342.50 247389 09/06/2024 Cal Mat Co. Accounts Payable Check 222.88 247390 09/06/2024 Tyler Technologies, Inc. Accounts Payable Check 2,465.00 247391 09/06/2024 Claudia Torres Accounts Payable Check 300.00 247392 09/06/2024 Vestis Group, Inc. Accounts Payable Check 155.93 247393 09/06/2024 Vestis Accounts Payable Check 193.81
247394 09/06/2024 Brenda Vaca Accounts Payable Check 350.00 247395 09/06/2024 Maria Villarreal Accounts Payable Check 600.00 247396 09/06/2024 Westside Water Conditioning Accounts Payable Check 62.95 247397 09/06/2024 Windecker Inc Accounts Payable Check 7,135.31 247398 09/06/2024 Young's Air Conditioning Accounts Payable Check 997.00 Break in check sequence due to the following: Payment Type Payment Check #247011- #247012 (Manual Void) Regular Checks 429 3,663,789.28 Check #247043 (Manual Void) Manual Checks 0 0.00
Check #247089 - #247092 (Payroll) Voided Checks 0 0.00
Check #247109 (Payroll) 429 3,663,789.28
Check #247191 - #247198 (Payroll)
Check #247234 - #247215 (Payroll)
Check #247278 - #247279 (Manual Void)
Check #247288 (Manual Void)
Check #247300 - #247305 (Payroll)
Check #247367 (Manual Void)
Check #247372 (Manual Void)
16 ITEM 7B

CITY OF LOS BANOS

CITY COUNCIL MEETING MINUTES
AUGUST 7, 2024
ACTION MINUTES - These minutes are prepared to depict action taken for agenda items presented to the City Council. For detail of this meeting refer to the electronic media (CD and/or audio) kept as a permanent record.

CALL TO ORDER: Mayor Llanez called the City Council Meeting to order at the hour of 6:00 p.m.

PLEDGE OF ALLEGIANCE: Police Chief Reyna led the pledge of allegiance.

ROLL CALL - MEMBERS OF THE CITY COUNCIL PRESENT: Council Members Douglas Begonia, Jr., Brett Jones, Kenneth Lambert, Deborah Lewis, Mayor Paul Llanez; ABSENT: None
STAFF MEMBERS PRESENT: City Attorney Vaughn, Police Chief Reyna, City Clerk/Human Resources Director Mallonee, City Treasurer Lawrence, Community & Economic Development Director Souza Elms, Parks & Recreation Director Heim, Finance Director Portillo, Public Works Director/City Engineer Bergson CONSIDERATION OF APPROVAL OF AGENDA: Motion by Jones, seconded by Lambert to approve the agenda as submitted. The motion carried by the affirmative action of all Council Members present.

PRESENTATION: CERTIFICATE OF RECOGNITION - EMPLOYEE OF THE MONTH FOR JULY 2024 - JELENE DE MELO, ADMINISTRATIVE COORDINATOR IN THE PUBLIC WORKS DEPARTMENT: PROCLAMATION - RECOGNIZING THE RETIREMENT OF CITY OF LOS BANOS POLICE OFFICER TODD PRICOLO; PROCLAMATION - RECOGNIZING AUGUST 4-10, 2024 AS NATIONAL HEALTH CENTER WEEK 2024. Mayor Llanez presented the certificates for which Jelene de Melo and Amy Carrollo were in attendance to accept to accept. Ms. Carrolo spoke regarding Golden Valley Health Center, the services they provide to the community, and how the offices in the Los Banos have been recently remodeled.

PUBLIC FORUM: MEMBERS OF THE PUBLIC MAY ADDRESS THE CITY COUNCIL

MEMBERS ON ANY ITEM OF PUBLIC INTEREST THAT IS WITHIN THE JURISDICTION OF THE CITY; INCLUDES AGENDA AND NON-AGENDA ITEMS. NO ACTION WILL BE TAKEN ON NON-AGENDA ITEMS. SPEAKERS ARE LIMITED TO A FIVE (5) MINUTE PRESENTATION. DETAILED GUIDELINES ARE POSTED ON THE COUNCIL CHAMBER INFORMATIONAL TABLE. Mayor Llanez invited the public to come forward and speak. AMY BONILLAS spoke regarding an important development in the City of Fresno and how it will be a misdemeanor to sleep in public parks, their recent ordinance made this change and how she is an advocate for the homeless, she is worried about what will be enacted here in the City of Los Banos and inquired as to what the plans 17 are, is there a strategic plan for homeless, tiny homes, what will happen to the unhoused in our community until the tiny homes are built, urged the council to not enact an ordinance like Fresno did; JACQUELINE LAWRENCE, Los Banos, stated that it takes a homeless person to know what the homeless need, the black asphalt is going to get people sunburned, there are no trees and if you can put trees on streets why not out by the homeless, why isn't there a homeless building being built, she has been in bridge homes and other types of homeless housing, she has been with the homeless outreach and did what she could to help them out, she was homeless because she was divorced and her husband wouldn't pay her, some people are being victimized and need help, they have mental and drug issues, how she was personally victimized, if you listen to the homeless and to why they are homeless and urged them to help them, she has been homeless several times, and you need to build the homes with love; UNNAMED PERSON, spoke regarding his concerns regarding selected promotion of businesses in towns, how we need to do so in an unbiased and fair way, allocation of tax payer dollars should be fair, it has come to his attention that some business are getting special help, this should not come at the expense of other businesses, the City should promote fairness and equal opportunity, work together to support the growth and success of our community, never once did he get invited to become a member of the chamber of commerce as a new business, and how a new business gets recognition and others don't, feels like social media promotions by the City should be fair, what Imagine Way More is doing is great but feels that a lot more could be done; UNNAMED PERSON thanked the Council for the phone calls and spoke regarding the rail trail and what will happen when the homeless are not there and how the trees have created a real nice canopy and now how the trees have had to be cut to create space for emergency vehicles and now the shade cover is gone and you can see all the businesses and the garbage in the basin, it is shame that that will be consequence long after it is gone, Shaunessy Park and DeAnza Way and how this has been the situation for 3 years and how Mr. Hostetler blames the city is not acceptable, to leave the people in this area with the situation is not right, he needs to dedicate it to the City so that the park can be improved, he berates the city council for what they are doing but leaves this eyesore, would be nice to have his help instead of his resistance, he needs to finish up De Anza Way too and feels that is it unsafe and an eyesore, she hopes the City learns by these horrible things that are happening and use these lessons in the next planning on what not to do; UNNAMED PERSON made an announcement that from noon-3pm they are taking the imitative and having an antiharassment rally at Pacheco Park, there is a wonderful program here in town Helping One Woman and how it is used to help women who have had a loss or need in their life, how public participation is a foundation of this nation and how this Council has eliminated public participation and how all items are on the consent agenda and the only voice we have is from Council Member Lewis who advocates for information, would like to thank the Parks & Recreation for a wonderful program yesterday and for being consistent with our development and beautification of our parks where back in 2020 this was all initiated with Measure H, where there was also suppose to be a splash pad and a Veterans Memorial wall, thanked Mr. Heim for all the new playground equipment, how homeless community outreach is not happening, the walkway path to Merced College needs to become a priority again, and the traffic measure in choices of a roundabout or traffic light need to be reconsidered; UNNAMED PERSON, apologized to Mayor about his comments about him drinking alcohol at an event which he was wrong about and apologized for that, 18 how a PRA was made for records of texts, emails and the City of Los Banos has not responded fully and the deadline passed, July 24, 2024 response was made with a link to the documents to only emails, that were a dozen emails shared between the City Manager, Mayor, Council Members and how this should be concerning to the public that there were not more records; BLANCHE JORGE spoke regarding the work being done to spay and neuter dogs and out at the animal shelter helping each other out, how when a cat is being taking care of they notch their ear and that's how you know; PASTOR RAUL, Mercey Springs Church, reminded all that the cooling center is still open until and encouraged all to get out of the heat and come to the cool center, spoke regarding shopping local and how important it is and the ethical implications when you don't shop local and you buy products online, buying local and the more you purchase the more likely you are actually contributing to fair market, encouraged the City to shop local and give local vendors preference and continue to do that, wonders why do we pay so much for fuel here in Los Banos and how they are bringing prices to what they can and the consumer can decide what to spend, and asked the Council and City to reach out to our local gas station owners and ask them to come forward and explain to the public why you are charging so much in this community. No one else came forward to speak and the public forum was closed.

CONSIDERATION OF APPROVAL OF CONSENT AGENDA. Council Member Lewis requested that items 7 A - Check Register for #246238 - #246583 in the Amount of $4,272, 170.82., 7D - City Council Resolution No. 6815 - Amending the 2024 - 2025 Fiscal Year Budget and Approving the Increase of Expenditures in the Amount of $44,447.47 and Revenues in the Amount of $39,447.47 Related to the Replacement of a Totaled Code Enforcement Vehicle, to be Reimbursed by Sedgwick Insurance Firm and 7F - City Council Resolution No. 6817 - Authorizing the City Manager to Execute the Second Amendment to the Professional Services Agreement with Carollo Engineers, Inc. for the Storm Drain System Master Plan Update in the Amount of $57,883 be removed for discussion and a separate vote.
7A - Check Register for #246238 - #246583 in the Amount of $4,272,170.82. Council Member Lewis inquired as to what check number 246742 made out to the CSJVRMA was for and Ms. Portillo responded that it is the general liability payment for workers comp insurance payment.
7D - City Council Resolution No. 6815 -Amending the 2024 - 2025 Fiscal Year Budget and Approving the Increase of Expenditures in the Amount of $44,447.47 and Revenues in the Amount of $39,447.47 Related to the Replacement of a Totaled Code Enforcement Vehicle, to be Reimbursed by Sedgwick Insurance Firm. Council Member Lewis made note that we have an insurance payment for a car that was totaled and the cost of replacement, why are there two separate accounts, the refund into one and the purchase after the other for which Mr. Reyna said that one is a Revenue account for the Police Department.
7F - City Council Resolution No. 6817 - Authorizing the City Manager to Execute the Second Amendment to the Professional Services Agreement with Carollo Engineers, Inc. for the Storm Drain System Master Plan Update in the Amount of $57,883. Council 19 Member Lewis made note that this is a second request of expenditure going back to May 2023, the staff report states that the City is required to install meters, which have not been done in 20 years and wonders why an assessment was made to be included in the budget for which Mr. Bergson responded that the water District is requesting this as we have never had the meters, was not in the Storm Drain Master Plan, and was a project underway. Council Member Lewis inquired as to we hired this company in 2023 and was there a discussion about installing these meters for which Mr. Bergson explained how we were aware but another firm was handling it but we now have a company doing it, Provost & Pritchard was the first firm that we contacted. Ms. Elms explained the business need and Mr. Bergson stated that Provost & Pritchard were too costly and they reached out to Corolla to get a better price and deal. Mayor Llanez added that we talk about something we should have done 20 years ago, went to fix it, and get a better rate.

Motion by Jones, seconded by Lambert to approve the consent agenda as follows: Check Register for #246238 - #246583 in the Amount of $4,272,170.82; City Council Meeting Minutes for July 17, 2024; City Council Resolution No. 6814 -Approving the Acceptance of a $50,000 Grant (PT25050) from the California Office of Traffic Safety (OTS) and Amending the 2024-2025 Fiscal Year Budget by Increasing the Appropriation Amount of the State Grant Fund Account for Expenditures and Revenues in the Amount of $50,000; City Council Resolution No. 6815 -Amending the 2024 - 2025 Fiscal Year Budget and Approving the Increase of Expenditures in the Amount of $44,447.47 and Revenues in the Amount of $39,447.47 Related to the Replacement of a Totaled Code Enforcement Vehicle, to be Reimbursed by Sedgwick Insurance Firm; City Council Resolution No. 6816 - Authorizing the City Manager to File a Regional Surface Transportation Program (RSTP) Exchange Program Fund Claim Form for Fiscal Year 2023-2024 in the Amount of $652,215; City Council Resolution No. 6817 -Authorizing the City Manager to Execute the Second Amendment to the Professional Services Agreement with Carollo Engineers, Inc. for the Storm Drain System Master Plan Update in the Amount of $57,883; City Council Resolution No. 6818 - Approving a Tentative Agreement I Memorandum of Understanding By and Between the City of Los Banos and the Los Banos Police Dispatchers Community Services Officers Association (LBPDCSOA) from July 1, 2024 - June 30, 2027; City Council Resolution No. 6819 -Amending Division 4, Salary Schedule - Employee Classifications of the City's Policy & Procedures Manual Relating to Changes to Section G - Police Associated with the LBPDCSOA Tentative Agreements I Memorandums of Understanding. The motion carried by the affirmative action of all Council Members present.

PUBLIC HEARING - TO RECEIVE PUBLIC COMMENT AND CONSIDERATION OF A CONDITIONAL USE PERMIT #2024-05 AND A CATEGORICAL EXEMPTION FROM

THE CALIFORNIA ENVIRONMENTAL QUALITY ACT PURSUANT TO SECTION 15301 , EXISTING FACILITIES, TO ALLOW THE USE OF A TYPE 41 ALCOHOL

LICENSE FOR THE ON-SALE OF BEER AND WINE FOR A BONA-FIDE EATING PLACE, LA GLORIA RESTAURANT AND DESSERTS LLC, LOCATED AT 265 MERCEY SPRINGS ROAD, I & J. MORE SPECIFICALLY IDENTIFIED AS ASSESSOR'S PARCEL NUMBERS: 025-121-012 AND 013; CITY COUNCIL RESOLUTION NO. 6820 - FINDING THE PROPOSED PROJECT TO BE

CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENT AL QUALITY 20 ACT PURSUANT TO SECTION 15301 , EXISTING FACILITIES AND APPROVING CONDITIONAL USE PERMIT #2024-05 FOR A TYPE 41 ALCOHOL LICENSE FOR LA GLORIA RESTAURANT & DESSERTS LOCATED AT 265 MERCEY SPRINGS ROAD, SUITE I & J. Community & Economic Development Director Souza Elms presented the staff report.

Council Member Lewis inquired as to if there are going to be any cameras on the exterior for which the applicant responded that yes there are plans to have cameras on the exterior on the back end and the front end facing the entrances.

Mayor Llanez opened the public hearing. No one came forward to speak and the public hearing was closed.

Motion by Jones, seconded by Lambert to adopt City Council Resolution No. 6820 - Finding the Proposed Project to be Categorically Exempt from the California Environmental Quality Act Pursuant to Section 15301, Existing Facilities and Approving Conditional Use Permit #2024-05 for a Type 41 Alcohol License for La Gloria Restaurant & Desserts Located at 265 Mercey Springs Road, Suite I & J. The motion carried by the affirmative action of all Council Members present.

City Attorney Vaughn and Council Member Lambert recused themselves from the next item, as they both have business in the PBID and left the Council Chambers.

PUBLIC HEARING - TO RECEIVE PUBLIC COMMENT AND CONSIDERATION FOR

THE RENEWAL OF THE LOS BANOS DOWNTOWN PROPERTY ANO BUSINESS IMPROVEMENT DISTRICT; CITY COUNCIL RESOLUTION NO. 6821 - RENEWING

THE LOS BANOS DOWNTOWN PROPERTY AND BUSINESS IMPROVEMENT

DISTRICT (LBDPBID), APPROVING THE ASSESSMENT FORMULA AND LEVYING THE ASSESSMENTS. Community & Economic Development Director Souza Elms presented the staff report, which included a PowerPoint presentation which was presented in more detail by Emily Brown of Civitas.

Council Member Lewis inquired as to if there are property owners that have 1 vote or more, is it based on square footage for which Ms. Brown responded that it is essentially tied back to the amount they are paying, .31 cent per lot sq. footage. Ms. Souza Elms clarified that it is a percentage based on the contribution. Council Member Lewis inquired as to if some of the property owners not vote for which Ms. Souza Elms stated that the City Clerk will be tabulating shortly and will report out the results. Council Member Lewis added that there was not much appetite for change and this is what will be happening for the next 10 years forward, Ms. Brown stated that we set broad plans and the board of director set the more detailed plans. Council Member Lewis inquired as to what the property owners will be doing to enhance the downtown, i.e. buildings that are outdated for quite some time, the aim is to showcase the downtown as an extension to have a place of destination and opportunity for business, what will the existing business be doing to enhance the downtown to get more businesses and people into the downtown area, referring to a city that she left that has a very nice downtown and we have done nothing, for which Ms. Brown responded that it is all in the plan. Mayor Llanez stated that the City 21 Council has no authority to tell a business how to run their business, the management plan is supposed to be general and our purpose tonight is to approve this to allow them to move forward with what the decide. David Souza, Board Member of the Downtown Association and a property owner of a business downtown, stated that the annual budget is around $180,000 and the purpose is to act as a liaison between the city, ownership and new business and give them an open channel with City leaders and better a plan and expedite things, he has seen a huge improvement in the downtown in the last 4 years, he has been involved with other downtowns and it takes about 10-12 years to see a substantial change, with a limited budget we are able to do smaller projects with partnership with the City, working with business owners to help business owners with improvements, other city downtown associations had issues with not knowing who to go to and didn't have the connections like we do here in Los Banos. Council Member Lewis inquired as to what is the plan to work with the business owners to improve the downtown over the next 10 years for which Mr. Souza responded that we email our downtown group monthly, we have an open door policy and there is not really that much involvement, in the last 24 months we have most definitely decided where monies need to go, less in staffing and more into the downtown and partner with the City, not much you can do with a limited budget like this, it takes time, he can see a big transformation, the downtown entrance sign is coming and will attract people, and they are using the budget funds as efficiently as we can.

Mayor Llanez opened the public hearing. INAUDIBLE NAME, stated that they are against this, how it was sold as improvements, the money should be there as a loan program to change the look of the downtown, for fac;ade improvements, events being held downtown, she has not been happy with it, you have a full time city employee working on this, why isn't the Chamber of Commerce promoting the city, she objects to all the dollars having all the votes, the rich man gets everything, how the board is self-promoting and you can only get on the board if a board member selects you, taking care of those that have the dollars, she does not think this is the right way to spend our dollars, the city itself has a big percent of the vote and there is already 50% before we cast our vote, is that fair; UNNAMED PERSON, talk about video cameras and how she fell and 3 city workers were there when it happened, and not one person from the cameras did anything, she wants to bring sewing projects back to Miller & Lux for different age groups, Modern Mother Hubbard arts & crafts idea she has, new business in Los Banos Drug Store, she does not feel that the downtown association should be paying for the fireworks, the whole town should be helping to pay for all of the fireworks, downtown is small; TAYLOR WOLFSEN, spoke in favor of the LB PBID and spoke to the huge strives that had been made, i.e. new events that bring people downtown, many of the events are partnership with the City, tree trimming project and the archway sign, the PBID has offered all downtown merchants and property owners a more direct line of communication with City officials, successes have come with turbulent times, i.e. when Greg Hostetler reneging on his pledge of dollars, hit with COVID and events didn't happen during COVID, lost his friend Sharon Silva the PBID Executive Director to the PBID and regardless of these setbacks we have continued on, marketing is a goal and to those who are against it he would ask if you have been to a meeting, have you voiced your opinion, things can be darkest before the dawn and urges the City to pass the PSI D for the next 10 years. No one else came forward to speak and the Public Hearing was closed.
22 A brief recess was held so that the City Clerk could tabulate the PBID ballots, for which she did and announced each ballot voting individually out load for all to hear. The overall results were as follows: YES: 55. 75% (18) and NO: 44.25% (26), a detailed list of the ballot results is available in the City Clerk's Office.

Motion by, seconded by to adopt City Council Resolution No. 6821 - Renewing the Los Banos Downtown Property and Business Improvement District (LBDPBID), Approving the Assessment Formula and Levying the Assessments. The motion carried by the following roll call vote: AYES: Begonia, Jones, Lamber, Llanez; NOE: Lewis, ABSTAIN: Lambert; ABSENT: None.

City Attorney Vaughn and Council Member Lambert returned to the Council Chambers and their seats at the dais.

CANCELLATION OF THE REGULAR CITY COUNCIL MEETING SCHEDULED FOR WEDNESDAY, SEPTEMBER 4, 2024 DUE TO SUMMER BREAK. Motion by, seconded by to cancel the Regular City Council Meeting scheduled for September 4, 2024 due to summer break. The motion carried by the affirmative action of all Council Members present.

ADVISEMENT OF PUBLIC NOTICES. (One Report). Community & Economic Development Director Souza Elms stated that a Public Hearing will be held by the Los Banos Planning Commission on August 14, 2024 to consider a Categorical Exemption from the California Environmental Quality Act (CEQA) pursuant to Section 15302(b ), Replacement or Reconstruction, for Site Plan Review #2024-05 for the demolition of the existing modular building and the addition of a new modular building for the Los Banos Animal Shelter, located at 1010 Airport Rd., more specifically identified as Assessor's Parcel Number: 081-120-007.

CITY MANAGER REPORT. City Manager Pinheiro stated that we are installing solar panels at the Community Center on the side parking lot in partnership with PCE and will be a nice update and a lot of work has been done there, continue to do striping and paving throughout the City and thanked all staff for all their hard work, National Night Out event last night was phenomenal and is a nice event and the Fire Department had the coolest prize with the water squirter, great event for Police Chief Reyna and Sergeant Mendez for putting it together and heard comments that it was the biggest we've had, thank you to the community for the involvement.

REPORT/UPDATE ON MERCED COUNTY ASSOCIATION OF GOVERNMENTS (MCAG), PENINSULA CLEAN ENERGY (PCE)1 MEASURE V COMMITTEE, AND SAN

JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (SJVAPCD), AND LOS

BANOS DOWNTOWN PROPERTY & BUSINESS IMPROVEMENT DISTRICT (LBDPBID). Council Member Lewis stated that there is no report for the SJVAPCD as the meeting is coming up, but noted that the air quality in Los Banos has been unhealthy especially with those with respiratory illnesses and encourage them to stay indoors when the air quality is poor and turn on your air filters. Mayor Llanez stated that with MCAG we 23 have open discussions with CalTrans and was very happy to report that the median at Badger Flat & Highway 152 has since been grated and the potholes filled, how Measure V helps, as leadership votes on projects and policies for the City of Los Banos not the State of California, they have full rule of State highways.

CITY COUNCIL MEMBER REPORTS:

DOUGLAS BEGONIA, JR.: Spoke regarding the work that has been done in his district, striping on Snow Goose and Fallbrook just in time for the starting of school, College Greens area and Shauenssey Park and how we want the park as soon as we can, we are working on it, the homeless on Pfitzer Way and Ms. Avila's concerns, we are working on that and looking to relocate them soon, National Night out was fantastic and to see all the people to connect with the amazing law enforcement we have here in the City, it was pretty awesome to see all the people there, amazing show from all the City staff who put it together.

BRETT JONES: Stated that he has always been a supporter of the downtown, he was a little concerned which way the vote was going to go and excited to see what the next 10 years will look like downtown, National Night Out is probably the best event to date, pretty impressive and are getting better and better every year, thanks to all staff who worked hard on that.

DEBORAH LEWIS: Acknowledged the Police Chief and his staff for an excellent National Night Out and all the City staff that helped, along with Merced County and Merced Police being there too, pretty cool gifts that were given away with the raffle tickets, job well done, thank you very much.

KENNETH LAMBERT: Congratulated all on a job well done last night, a lot new vendors including Merced County Search and Rescue, nice to see the drones flying around, the County had their robot, good job by all and Sergeant Mendez and all the departments that put it on.

PAUL LLANEZ: Spoke to comments during public forum and the homeless, he can't speak to what Fresno is doing, but what the Governor did does not change what we have planned, we are still moving with everything we are trying to do, we are working on a grant and just received a grant for a total of $14.0 million to provide resources and options to the homeless and building tiny homes, plan is to offer resources in a safe place near our Police Department; as to the business promotions and what we are posting on social media and he would love to see a policy on how to do that fairly and would like to talk to any business owners for a fair policy; trees on the rail trail and damage is damage, we will do the assessment once it is cleared out; no sure about a members only meeting on homeless; walking path to college and he voted no on that as he thinks it is dangerous and will encourage college students to take advantage of the bus programs which are free for registered students; thanked Mr. Hostetler for apologizing for misspeaking and then spoke to Public Records Act requests and how we only have one City Attorney, the number of emails we have, how he speaks to the City Manager by phone, those things take time; he is so proud of the Animal Shelter and what is being done out there and the 24 events we are having for animals; how gas prices are a concern for him too and he found out it is the profit and loss on the amount of gas that is sold; there is a blood drive at the Community Center tomorrow; thanked Mr. Heim for putting out the new Recreation Guide and there are so many things to do in the City.

ADJOURNMENT. Motion by Lambert, seconded by Begonia, the meeting was adjourned at 8:20 p.m.

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
25 THIS PAGE IS INTENTIONALLY LEFT BLANK
26 ITEM 7C

CITY OF LOS BANOS

CITY COUNCIL MEETING MINUTES
AUGUST 21, 2024
ACTION MINUTES - These minutes are prepared to depict action taken for agenda items presented to the City Council. For detail of this meeting refer to the electronic media (CD and/or audio) kept as a permanent record.

CALL TO ORDER: Mayor Llanez called the City Council Meeting to order at the hour of 6:00 p.m.

PLEDGE OF ALLEGIANCE: Police Commander Drum led the pledge of allegiance.

ROLL CALL - MEMBERS OF THE CITY COUNCIL PRESENT: Council Members Douglas Begonia, Jr., Brett Jones, Kenneth Lambert, Deborah Lewis, Mayor Paul Llanez; ABSENT:

None
STAFF MEMBERS PRESENT: Police Commander Drum, City Clerk/Human Resources Director Mallonee, Community & Economic Development Director Souza Elms, Parks & Recreation Director Heim, Finance Director Portillo, Public Works Director/City Engineer Bergson
CONSIDERATION OF APPROVAL OF AGENDA: Motion by Jones, seconded by Lambert to approve the agenda as submitted. The motion carried by the affirmative action of all Council Members present.

PRESENTATION - CERTIFICATE OF RECOGNITION - VIDYA SRINIVAS. AINAK - FACILITATED EYE GLASSES. Mayor Llanez presented the certificate to Ms. Srinivas who was in attendance to accept to accept.

PUBLIC FORUM: MEMBERS OF THE PUBLIC MAY ADDRESS THE CITY COUNCIL

MEMBERS ON ANY ITEM OF PUBLIC INTEREST THAT IS WITHIN THE JURISDICTION OF THE CITY; INCLUDES AGENDA AND NON-AGENDA ITEMS. NO ACTION WILL BE TAKEN ON NON-AGENDA ITEMS. SPEAKERS ARE LIMITED TO A FIVE (5) MINUTE PRESENTATION. DETAILED GUIDELINES ARE POSTED ON THE COUNCIL CHAMBER INFORMATIONAL TABLE. Mayor Llanez invited the public to come forward and speak. BLANCHE JORGE, proud resident of the downtown area, spoke regarding how they were able to spay and neuter a number of animals and how the City team continues to get more and more grants, we will be coming out with more programs and more assistance, there is so much being done, there are cats that are getting fixed daily and the impact is crucial for our community, we trade cats with other communities, how important every single person is working together to do all that we do, how there won't be a change and she prays for them all the time and thank you for your support and would like for this to continue on and on, thank you very much for your time, we appreciate it; KA THY BALLARD, here to congratulate Cami for a job well done for getting the homeless removed from the rail trail behind her home, how coming to Council meetings and complaining is what makes things 27 happen not posting on Facebook, congratulated Mr. Begonia on how he finally picked up the phone to call Cami, as did the City Manager and Mayor, how she has traveled of late up north and how other cities are planning for a dump in the economy and how her City is spending millions of dollar each Council Meeting, how relocating offices for a cost and how the PD was in their old place for years, how Lambert stated that he was part of making the Police Station happen which and she spoke to the special tax measures, Police Chief Knapp, Police Chief Brizzee and it is just not you guys who made it happen, the cities she has visited have put shopping centers on hold because of costs, she feels that the council are doing all these things because it is an election year; GREG HOSTETLER spoke regarding Vineyard Drive and how Brett Jones made a statement that was untrue a few meetings ago, which he should know better, referred to an agreement from 1998 that proves that he was wrong with his statement, funds were not to be comingled, where is the money, now you are meeting with CalTrans and people have lived there with no connection, spoke to an RFP on May 10, 2023 for Vineyard, the number of Public Works Directors that you have gone through, having public meetings to talk about this during election year, how you have not submitted your text messages, a law suit, and how only 89 emails have not been produced, the 2023/24 was $170 million budget, he thinks that you are financially illiterate, looked at some of your history and how Jones has filed bankruptcy with the Fresno Court and how you only made $850 a month, you refused to have a study session to review the budget for 2024/25, Council Member Lewis asked for a review and it was denied, the public has a right to see these things, it is bad business, how Jones was on Council when the City voted that his project was complete and he can't finish it he doesn't own it, park is not complete in the last 5 years and you have all the money, don't play it on me, have a nice meeting; UNNAMED PERSON stated that she is happy as a clam, she is ecstatic and happy that the homeless have been removed from the trail behind her home, you did a fabulous job and it looks wonderful, thank you and I appreciate it, and would like now to work with Mr. Heim on how to get trees replaced; JOHN CATES addressed once again some of the positives that have gone on in the community over the year and a half or two, there have been quite a few capital projects that have been taken place that haven't been taken care of in years, one is the Animal Shelter and it is amazing that it has sat that long with nothing being done, a lot of criticism about broken processes and if you are outside City Hall how do you know that, how is that information getting out there, there are things getting out in the newspaper that he doesn't even know as a Planning Commissioner, growing up and becoming a mature retired guy there is this psychology that the simplest answer is the truth, the information is getting out to our media and shouldn't be getting out there, it's not this or that, is A to B, who is A and who is B, there is probably the largest of 2 projects in Ms. Lewis's District with her sitting on Council and why not sooner, he was here during budget review June 5th, the PBID item came up as a public hearing and how Ms. Lewis threw a fit because she wanted to talk about it and how the Brown Act doesn't allow for discussion, there are so many things going on, they would rather see the City fail than the City Manager and City Council succeed; NORMA BLACKWOOD spoke regarding the downtown parking and how generally these is not parking and how she depends on her customers being able to park, she has customers that need to be able to walk to her business, her brother lost his legs in Vietnam in his 20s, had to walk a block to get a haircut and never complained, the handicapped shouldn't have to do that, we have no handicap parking near my barbershop, she wants to know if there is anything that can be done for people who can't walk that far, she has talked to some of the merchants downtown and they feel the same way but couldn't be here. No one else came forward to speak and the public forum was closed.
28 CONSIDERATION OF APPROVAL OF CONSENT AGENDA. Council Member Lewis requested that the following items be removed from the consent agenda for discussion ?A - Check Register for #246584 - #246939 in the Amount of $1,121,534.44 and 7B - City Council Resolution No. 6822 - Adopting a Revised Budget for the 2024-2025 Fiscal Year as it Pertains to Expenditures in the Villa Park Impact Fee Fund for the Cresthills Park Extension in the Amount of $446,294.26.
?A - Check Register for #246584 - #246939 in the Amount of $1,121 ,534.44. Council Member Lewis inquired as to checks made out to Suzanne Mendez for and Oscar Daniel Martinez. Vanessa will look into the items noted and that one was for the Animal Shelter Gate.
7B - City Council Resolution No. 6822 - Adopting a Revised Budget for the 2024-2025 Fiscal Year as it Pertains to Expenditures in the Villa Park Impact Fee Fund for the Cresthills Park Extension in the Amount of $446,294.26. Council Member Lewis noticed that the contract for the Cresthills Park on Pioneer flanking Gus Villata Road was signed in July 2023 and invoices are now just being submitted, is there a reason why this bill wasn't paid in FY 22/23 or in the FY 23/24 for which Mr. Bergson explained and Ms. Souza Elms stated that the invoices were only received in June of this year and staff brought them forward. Council Member Lewis inquired as to if the City date stamps their invoices when they receive them for which Ms. Souza Elms stated that would be a question that Finance Director would answer, but it would depend, as this was routed through the City Attorney's office and was received June 25, 2024. Mayor Llanez inquired as to if that is normal practice that they send us invoice that is that old that needs to be paid for which Ms. Souza Elms stated that Legal Counsel has been working with the developer on this reimbursement and we finally received all the documentation needed to move forward with payment.

Motion by Lewis, seconded by Lambert to approve the consent agenda as follows: Check Register for #246584 - #246939 in the Amount of $1,121,534.44; City Council Resolution No. 6822 - Adopting a Revised Budget for the 2024-2025 Fiscal Year as it Pertains to Expenditures in the Villa Park Impact Fee Fund for the Cresthills Park Extension in the Amount of $446,294.26; City Council Resolution No. 6823 - Approving a Tentative Agreement I Memorandum of Understanding By and Between the City of Los Banos and the Los Banos Fire Fighters Association (LBFFA) from July 1, 2024 - June 30, 2027; City Council Resolution No. 6824 - Amending Division 4, Salary Schedule - Employee Classifications of the City's Policy & Procedures Manual Relating to Changes to Section F - Fire & Building Associated with the LBFFA Tentative Agreement I Memorandums of Understanding. The motion carried by the affirmative action of all Council Members present.

DESIGNATION OF VOTING DELEGATE AND AL TERNATE(S) FOR THE 2024 LEAGUE

OF CALIFORNIA CITIES (LCC) ANNUAL CONFERENCE & EXPO BEING HELD OCTOBER 16-18, 2024 IN LONG BEACH, CALIFORNIA. Motion by Lambert, seconded by Jones to designate Council Member Jones as the Voting Delegate. The motion carried by the affirmative action of all Council Members present.

Motion by Lambert, seconded by Jones to designate Council Member Begonia as the Alternate for the 2024 League of California Cities Annual Conference being held October 29 16-18, 2024 in Long Beach, California. The motion carried by the affirmative action of all Council Members present.

ADVISEMENT OF PUBLIC NOTICES. (No Report).

CITY MANAGER REPORT. City Manager Pinheiro spoke to Blanche's comments during the public forum regarding the work being done out at the Animal Shelter and thanked all for their hard work, spoke regarding the continued work to get the solar panel project done at the Community Center, the park on 7th Street and Pacheco and all the work being done there, he spoke to Kathy Ballard's comments and how it scares her that we are getting things done in the city, we are paving roads, trimming trees, creating more capacity for the V\/VVTP, investing in streets, in Fire vehicles, Police vehicles, we spend it responsibly, to not be able to fix the Animal Shelter, Ag Sports Complex, things that have been neglected for 25 years, not proud that the Police Department had to sit in a decrepit situation for such a long time, the need for a remodel at City Hall, we do bring the budget forward with a public hearing, proud of the work done on removing the homeless shelter, doesn't need to be commended for learning how to use a phone, we have been proactive with Council and the Mayor to start a Housing Division, under the guidance of Stacy Souza and her team received a grant and received a second grant, no one had to push us, thank you for your assistance and your comments, we are working diligently every single day, team at Animal Shelter working very hard and the amount of grant money received, sizable grant for our Colorado Ball Park, we appreciate the feedback and conversation and we are doing everything we can to make it better.

REPORT/UPDATE ON MERCED COUNTY ASSOCIATION OF GOVERNMENTS (MCAG), PENINSULA CLEAN ENERGY (PCE), MEASURE V COMMITTEE, AND SAN

JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (SJVAPCD), AND LOS BANOS DOWNTOWN PROPERTY & BUSINESS IMPROVEMENT DISTRICT (LBDPBID).

Mayor Llanez stated that he had a great MCAG meeting and encouraged all to use the bus system, if you are a college student it is free, if you are a senior it is free, take advantage of the resources and free transportation.

CITY COUNCIL MEMBER REPORTS:

BRETT JONES: No report
DEBORAH LEWIS: Stated that she received a message recently regarding the work planned at the dam, as some of us know 2 years ago the Federal Government and Reclamation were working building the damn up, there are talks of lane closure, we need to keep CalTrans informed and the community informed so that we are aware; how there is a sizable grant coming around for Colorado Park and she would like to know what the amount is, it is the oldest park in the City and she was out there the other night and there are some things that need some immediate repair and the rebar that is sticking out in the parking lot, several sidewalks are trip hazards, we've done a lot of tree trimming but there are tree roots that are growing up in the ground, a fence on the far west side that seems to be coming apart, drinking fountain dripping on the sidewalk and needs to be removed . 30 KENNETH LAMBERT: Spoke regarding the Police Station and how the previous Council did pass the budget for the Police Station and was told that it was put in several times and taken out, he does take pride in being part of the Council that passed the budget with the new Police Station in it.

DOUGLAS BEGONIA, JR.: Addressed comments made earlier during public forum and how he is happy for the people on Pftizer Way, doesn't want credit, just wished it happened sooner, spoke regarding had movie night at College Greens Park, how it is high school football season and Friday is the kickoff of the season at the new field, JV and Varsity will be at Dos Palos and Pacheco will be in Atwater, Cross Clash game is next week and encouraged all to attend games, if you go out to a freshman game Thursday night there is a flag football for girls a new sport, wished all a good season and staff focused in class.

PAUL LLANEZ: Speaking to comments made earlier during public forum that making the phone call the night before was what he told Cami he would do, she absolutely deserves credit for coming and reminding us what our jobs are, to motivate us and hold us accountable, he appreciates everyone that comes forward, he is goal oriented, she was vocal and found a solution, he wants to talk with anyone who wants to help out with eyesores; comment about going out of town and comparing us to other cities, the financial investments in the City are now getting us 7 figures instead of 5 figures and something he is very proud of with the forethought of as you want to see a return on investment, comments made on the 1998 Vineyard intersection and how he feels that we have to hold people accountable even if it is a developer, as the PRA request there are no text messages, he calls the City Manager doesn't text or email; the handicap parking issue downtown, not sure what we can do but would like to hear staff recommendation on what we can do.

CLOSED SESSION - CONFERENCE WITH LABOR NEGOTIATORS, PURSUANT TO GOVERNMENT CODE SECTION 54957.6, AGENCY DESIGNATED
REPRESENTATIVES: CITY MANAGER PINHEIRO. CITY ATTORNEY VAUGHN, HUMAN

RESOURCES DIRECTOR MALLONEE, FINANCE DIRECTOR PORTILLO, LEGAL COUNSEL TUFFOj EMPLOYEE ORGANIZATIONS: LOS BANOS POLICE OFFICERS ASSOCIATION (LBPOA}. NO reportable action, direction given to staff.

ADJOURNMENT. Motion by Lambert, seconded by Jones, the meeting was adjourned at 7:22 p.m.

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
31 THIS PAGE IS INTENTIONALLY LEFT BLANK
32 ITEM 7D
TO:

FROM:

DATE
LOsBanos
t tire C,ossn id of C1li , , nia
Agenda Staff Report
Mayor and City Council Members
Joe Heim, Parks and Recreation Direct;,. j;?
September 18, 2024
TYPE OF REPORT: Consent Agenda Item
SUBJECT: Authorizing Award of Construction to Zoom Recreation in the amount of $173,997.00 for the Construction of Shade Structures at City Parks Recommendation:

That the City Council adopts the Resolution awarding the Construction Contract to Zoom Recreation and authorize the City Manager to execute the Construction Contract agreement in the amount of $173,997.00. Staff is requesting approximately 15% contingency for a total project budget of $200,000.00.

Background:

In November 2022, First 5 of Merced County released a grant opportunity to parks and recreation agencies in Merced County. First 5 is funded by revenues from tobacco related taxes and supports services for youth physical activity.

First 5 completed a county-wide needs assessment in April 2020 that identified obesity and other socio-economic factors that led to low park usage. First 5 sought proposals for improvements to park locations that would support the increased use of parks for ages 0 to 5.

Los Banos Parks and Recreation utilized priorities identified in the 2021 Parks Master Plan to apply for funding of shade structures over playground locations. The projects were intended to originally confom, to a $200,000.00 budget and successful completion within a one-year timeline.
33 The City proposed to install shade structures over playground structures.

Shade structures provide a direct benefit for Los Banos parks. The installation of shade structures will increase usage of parks and protect the longevity of the playground structures.

Shade sail structures include posts and a fabric sail. The fabric shade sails typically require replacement every ten years, while the poles have a longer life-span. They provide a cost-effective alternative to large shade arbor structures.

In May 2023, First 5 of Merced County awarded the City of Los Banos $445,000.00 for the installation of shade sail structures at five park locations. The grant is fully reimbursable, with no matching amount required by the City.

The locations include:
• Big Page Park, 1055 West I St.
• Davis Park, 254 Santa Ana St.
• Citrus Terrace I Park, 226 Citrus Ave.
• Meadowlands I Park, 2600 Wood Duck Dr.
• Ranchwood Park, 515 Stonewood Dr.

Discussion:

The bid opening for the project was held on September 3, 2024. The Public Works Department, through the office of the City Clerk, received 10 bids from the following contractors:

Contractor: Location: Amount:

Westside Landscape & Newman, CA $324,008.00
Concrete, Inc.

G&G Builders Livermore, CA $247,283.00
TBS Contractor Merced, CA $414,960.00
Valley Construction Services, Stockton, CA $418,761.62
Inc.

Daguerre Construction Los Banos, CA $362,000.00
Resilient Builders Elk Grove, CA $305,754.00
Ronnys Inc. Los Banos, CA $176,750.00
Joe's Landscape & Concrete, Newman, CA $261,914.05
Inc.

Zoom Recreation Irvine, CA $173,997.00
Genesis Floor CoverinQ, Inc. Santa Fe Springs, CA $370, 135.00 Staff reviewed each of the bid proposals for completeness. Zoom Recreation has provided the lowest responsive and responsible bid for the project. Staff is recommending Zoom Recreation be awarded the contract for the construction of Shade Structures. Staff is recommending a contingency of fifteen percent (15%).

Work includes purchase and installation of the shade structures. 34 Work is anticipated to begin in October 2024 and a completion date will occur in winter 2025 and is dependent on the freight time for purchase.

The City intends to request additional shade structures utilizing remaining grant funds for future projects.

Fiscal Impact:

The project has an available budget of $445,000.00. The project is fully reimbursable, with no matching funds required. The contract award is $173,997.00.

Attachments:

Resolution
Bid Opening Sheet
Agreement
Advertisement for Bids
Vanessa Portillo, Finance Director
Notice of Intent to Award Shade Structures at City Parks 35 THIS PAGE IS INTENTIONALLY LEFT BLANK
36 RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF LOS BANOS AUTHORIZING THE CITY

MANAGER TO EXECUTE THE CONTRACT WITH

ZOOM RECREATION FOR THE CONSTRUCTION

OF SHADE STRUCTURES IN CITY PARKS IN
THE AMOUNT OF $173,997.00 AND A PROJECT
CONTINGENCY OF $26,003.00
WHEREAS, the City of Los Banos solicited bids for the Construction of Shade Structures located at Big Page Park (1055 West I St.), Davis Park (254 Santa Ana St.), Citrus Terrace I Park (226 Citrus Ave.), Meadowlands I Park (2600 Wood Duck Dr), Ranchwood Park (515 Stonewood Dr.); and
WHEREAS, the Public Works Department has determined, after receiving competitive proposals, that Zoom Recreation provided the lowest responsive and responsible proposal in the amount of $173,977.00; and
WHEREAS, the proposed construction project includes an approximate 15% contingency in the amount of $26,003.00; and
WHEREAS, the proposed contract has been reviewed by the City Attorney and approved as to form; and
WHEREAS, the Public Works Department requests the City Council authorize the City Manager to execute the contract with Zoom Recreation for the Construction of Shade Structures at City Parks.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby authorize the City Manager to execute the contract with Zoom Recreation for the Construction of Shade Structures at City Parks.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member ___ who moved its adoption, which motion was duly seconded by Council Member ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:
37 Lucille L. Mallonee, City Clerk
38 LOs Banos
\t tlw (n1.;~1 ,I ,f al1/m 11w

BID OPENING

SHADE STRUCTURE AT CITY PARKS
September 3, 2024, 2:00 PM

1. Westside Landscape & Concrete, Inc.

2. G & G Builders

3. TBS Contractors

4. Valley Construction, Inc.

5. Daguerre Construction

6. Resilient Builder

7. Ronnys Inc

8. Joe's Landscaping & Concrete, Inc.

9. Zoom Recreation

10. Genesis Floor Covering, Inc.

Signed:

City
Lucille
~
Clerk/Human
L. Mallonee,
'I.

Resources
MMC
~
Director
Engineering
~ Technician
$324,008.00
$247,283.00
$414,960.00
$418,761.62
$362,000.00
$305,754.00
$176,750.00
$261,914.05
$173,997.00
$370, 135.00
Dated: September 3, 2024
39 Agreement
THIS Agreement is dated as of the ____ day of ___ in the year 20_ by and between the City of Los Banos, a California municipal corporation ("Owner") and Zoom Recreation, a corporation ("Contractor").

Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:

1. WORK. Contractor shall complete the work indicated in Owner's Contract Documents entitled "SHADE STRUCTURES AT CITY PARKS."
The work is generally described as follows:

Construction of but is not limited to, the procurement and installation of a:
• 25' x 30' x 14' rectangular shade structure at Citrus I Terrace Park located at 226 Citrus Ave Los Banos, CA 93635;
• 20' x 26' x 12' rectangular shade structure at Big Page Park located at 1055 W. I Street Los Banos, CA 93635;
• 30' x 35' x 14' rectangular shade structure at Ranchwood Park located at 515 Stonewood Drive Los Banos, CA 93635;
• 30' x 35' x 14' rectangular shade structure at Meadowlands I Park located at 2500 Wood Duck Drive Los Banos, CA 93635;
• 25' x 25' x 14' triangular shade structure at Davis Park located at 254 Santa Ana Street Los Banos, CA 93635; and
• 30' x 30' x 14' square shade structure at Regency Tot Lot located at 500 Blk Addington Street Los Banos, CA 93635.

Contractor shall furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the work described herein.

2. CONTRACT TIME. Contractor shall commence the work required by the Contract Documents within 10 calendar days after the date of the Notice to Proceed and will complete the same within the time period set forth in the bid, unless the period for completion is extended otherwise by the Contract Documents.

3. LIQUIDATED DAMAGES. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the work is not completed within the time specified in Paragraph 2 herein, plus any extensions thereof allowed in accordance with Paragraph 21, Time for Completion and Liquidated Damages, of the General Provisions. The parties also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by Owner if the work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner Eight Hundred Dollars($ 800.00) for each day that passes after the time specified in Paragraph 2 herein.

4. CONTRACT PRICE. Owner shall pay Contractor for completion of the work in accordance with the Contract Documents in current funds the amount set forth in the Bid Schedule(s). The Contractor agrees to perform all of the work described in the Contract Documents for the unit and lump sum prices set forth in the Bid Schedule(s).
40 5. PAYMENT PROCEDURES. Contractor shall submit applications for payment in accordance with Paragraph 24, Progress Estimates, of the General Provisions. Applications for payment will be processed by Owner as provided in the General Provisions.

6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between Owner and Contractor concerning the work consists of this Agreement and the following attachments to this Agreement:
(A) Advertisement for Bids
(B) Information for Bidders
(C) Bid
(D) Bid Bond
(E) Agreement
(F) Payment Bond
(G) Performance Bond
(H) Notice of Award
(I) Notice to Proceed
(J) Change Order
(K) General Provisions
(L) Special Provisions
(M) Technical Specifications
(N) Exhibits
(0) Addenda
No. 1, dated August 20, 2024
There are no Contract Documents other than those listed in this Paragraph 6. The Contract Documents may only be amended by change order as provided in Paragraph 19, Changes in the Work, of the General Provisions.

7. MISCELLANEOUS.

A. Terms used in this Agreement which are defined in Paragraph 1 of the General Provisions will have the meanings indicated in the General Provisions.

B. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

C. Owner and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents.

D. The Laws of the State of California shall govern this Agreement. Venue is Merced 41 County. The provisions of this paragraph shall survive expiration or other termination of this Agreement regardless of the cause of such termination.

E. All bids become property of the Owner. All bids, including the accepted bid and any subsequent contract become public records per the requirements of the California Government Code, Sections 6250-6270, "California Public Records Act". Proprietary material must be clearly marked as such. Pricing and service elements of the successful bid are not consider proprietary information. The Owner will treat all information submitted in a bid as available for public inspection once the Owner has selected a contractor. If you believe that you have a legally justifiable basis under the California Public Records Act (Government Section 6250 et. seq.) for protecting the confidentiality of any information contained within your bid, you must identify any such information, together with the legal basis of your claim in your bid. In order for the Owner to assess confidentiality of any such information on your behalf, you must request, execute and submit an Owner-prepared written agreement to defend and indemnify the Owner for any liability, costs, and expenses incurred in asserting such confidentiality as part of your bid. The final determination as to whether the Owner will assert your claim of confidentiality on your behalf shall be sole discretion of the Owner.

F. This Agreement shall not be interpreted in favor of any Party by virtue of said Party not having prepared this Agreement.

G. If any time period provided for in this Agreement ends on the day other than a Business Day, the time period shall be extended to the next Business Day.

IN WITNESS WHEREOF, Owner and Contractor have caused this Agreement to be executed the day and year first above written.

Date
ATTEST:

Lucille L. Mallonee
City Clerk
APPROVED AS TO FORM:

William A. Vaughn
City Attorney
By: ------------- --- Authorized Representative of Owner Title: ----------------
42 By: -------------- -- Date Authorized Representative of Contractor Title: ------------- - -- (Seal if Corporation)
(Attach Acknowledgement for Authorized Representative of Contractor) 43 Advertisement for Bids

CITY OF LOS BANOS
520 J Street
Los Banos, California 93635
Notice is hereby given that separate sealed bids for the award of contract for the Construction of Shade Structures at City Parks will be received by the City of Los Banos at the office of the City Clerk until 2:00 p.m. Pacific Standard Time, September 3, 2024 and then at said office publicly opened and read aloud.

The major work consists of, but is not limited to, the procurement and installation of a:
•
•
•
•
•
•
25' x 30' x 14' rectangular shade structure at Citrus I Terrace Park located at 226 Citrus Ave Los Banos, CA 93635;
20' x 26' x 12' rectangular shade structure at Big Page Park located at 1055 W. I Street Los Banos, CA 93635;
30' x 35' x 14' rectangular shade structure at Ranchwood Park located at 515 Stonewood Drive Los Banos, CA 93635;
30' x 36' x 14' rectangular shade structure at Meadowlands I Park located at 2500 Wood Duck Drive Los Banos, CA 93635;
25' x 25' x 14' triangular shade structure at Davis Park located at 254 Santa Ana Street Los Banos, CA 93635; and
30' x 30' x 14' square shade structure at Regency Tot Lot located at 500 Blk Addington Street Los Banos, CA 93635. (Alternative Bid)
Please refer to the Exhibits for more information.

The time for completion shall be ninety (90) working days.

The Contract Documents, in their entirety, can be viewed and/or obtained from the City of Los Banos website at www.losbanos.org or at the following locations:

Central California Builders Exchange (www.cencalbx.com) Builders Exchange of Stockton (www.besonline.com)
Valley Builders Exchange, Inc. (www.valleybx.com)
Builders Exchange of Santa Clara County (www.bxscco.com) Dodge Data & Analytics (www.construction.com/plans/)
A payment bond prepared and executed in accordance with California Civil Code Section 9550 and a bond for faithful performance of the contract will be required of the successful bidder who is awarded the contract.

The successful bidder must comply with the latest general prevailing rate of per diem wages as determined by the Director of Industrial Relations, State of California, Department of Industrial Relations and is to be paid to the various craftsmen and laborers required to construct said improvements and is made a part of the specifications and contract for said work to which reference is hereby made for further particulars.

No contractor or subcontractor may be listed on a bid proposal or awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations 44 pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractor registration information can be found at:
http://www.dir.ca.gov/Public-Works/PublicWorks.html
Each bid shall be accompanied by cashier's or certified check or by a bidder's bond, made payable to the City of Los Banos and executed by a corporate surety licensed to issue surety bonds in the State of California, for an amount equal to at least ten percent (10%) of the amount of said bid and no bid shall be considered unless such cashier's or certified check or bidder's bond is enclosed therewith.

The successful bidder of this project shall have the following current and active California State Contractor's License at the time of the submission of the bid and throughout the duration of the contract: Class A- General Engineering Contractor, B- General Building Contractor, C61/D12- Synthetic Products or C-61/D34- Prefabricated Equipment.

Prospective bidders are required to attend a mandatory pre-bid meeting on August 8, 2024 at the Los Banos Community Center at 645 Seventh Street.

Bids will not be considered from bidders who were not physically in attendance at the mandatory pre-bid meeting.

Bidders shall refer to the Contract Document's Information for Bidders for complete instructions.

Bidders are solely responsible for the cost of preparing their bids.

The City specifically reserves the right, in its sole discretion, to reject any or all bids, to re-bid, or to waive inconsequential defects, in bidding not involving time, or quality of the work. The City may reject any and all bids and waive any minor irregularities in the bids. 45 THIS PAGE IS INTENTIONALLY LEFT BLANK
46 ITEM 7E
TO:

FROM:

DATE
LOsBanos
Agenda Staff Report
Mayor and City Council Members
Joe Heim, Parks and Recreation Direct~
September 18, 2024
TYPE OF REPORT: Consent Agenda Item
SUBJECT: Authorizing Award of Construction to Ronnys Inc. in the amount of $999,856.50 for the construction of Sunrise Ranch Park
Recommendation:

That the City Council adopts the Resolution awarding the Construction Contract to Ronnys Inc. and authorize the City Manager to execute the Construction Contract agreement in the amount of $999,856.50. Staff is requesting a 15% contingency of $150,000.00 for a total project budget of $1,149,856.50.

Background:

The Sunrise Ranch subdivision is located near Los Banos Jr. High, between Place Rd.

East B St., and San Luis St. The subdivision includes an undeveloped parcel intended to be developed as a future park location.

The park is located within the boundary of Martin St., Manuel Ct., and Evelyn Ct. The proposed park is approximately 1 acre in size and includes fencing between neighboring homes on the south side of the park.

On September 12, 2023 City staff hosted a public meeting to discuss the development of the park location. The meeting was publicly advertised through the Community Center, the Parks and Recreation monthly newsletter, the Recreation Guide, Facebook and through a mailer sent to all neighboring homes to the park area.

Over 30 people attended the meeting. A presentation was provided for information relating to the benefits of parks, pocket park and neighborhood park standards, the Sunrise Ranch location and suggested and required park amenities. 47 City staff assigned the design and engineering services for the project to O'Dell Engineering (O'Dell). Staff from O'Dell attended the September 13, 2023 meeting and received copies of all public comments received.

City staff identified that the park will provide additional service area coverage. A playground, walking pathways and a shade structure were highlighted among the requests.

City staff identifies that the development of the park will help to establish identity and comradery for the health of the community. The development of parks provides important public resources for active lifestyles, helps to reduce anxiety and is a benefit to all age groups.

In December 2023, O'Dell provided three concepts and an estimate of probable costs for City staff's review. City staff identified a recommended concept and presented the concept to a Special Meeting of the Parks and Recreation Commission for discussion on January 23, 2024.

Parks and Recreation commissioners were overwhelmingly positive about the concept.

The concept includes four ( 4) picnic tables, a shade structure, two (2) concrete corn hole sets, a half-court basketball court, a playground space including a free standing climbing option and a large embankment slide. The playground will be fenced and include an exercise station. Forty-five (45) trees will be planted on-site, and concrete pathways will provide access throughout the park.

The park proposed amenities provides a mixture of standard neighborhood park amenities such as a basketball court, playground and shade structure. While also providing unique amenities such as an embankment slide, climbing apparatus, exercise station and cornhole sets.

The park's amenities help to serve a wide-array of age groups including families, teens and seniors. Walking paths, basketball and the playground space will provide active spaces for all park users.

On February 7, 2024 the concept was presented to City Council and approved for design and development.

The park is funded from the Sunrise Ranch Park Fund, collected through impact fees related to the construction of housing in the subdivision.

Discussion:

The bid opening for the project was held on September 6, 2024. The Public Works Department, through the office of the City Clerk, received four ( 4) bids from the following contractors:

Contractor Location Amount
Ronnys Inc. Los Banos, CA $999,856.50
Granite Rock Company San Jose, CA $1,524,037.15
Westside Landscape & Newman, CA *$1, 134,117.20
Concrete, Inc.
48 Westside Landscape & Newman, CA *$1, 134,117.20
Concrete, Inc.

Taylor Backhoe Service, Inc. Merced, CA $1,460,430.19
*Westside Landscape & Concrete, Inc. had a discrepancy in the bid schedule for unit price. $1,134,117.20 was listed as the total bid, however, "in case of discrepancy between the unit prices and the extension thereof, the unit price shall be considered as correct when evaluating bids." The unit price for Bid Item 11 was incorrectly listed and would generate a bid amount of $348,612,469.20. For this reason, staff finds Westside Landscape & Concrete, Inc. as non-responsive.

Staff reviewed each of the bid proposals for completeness. Ronnys Inc. has provided the lowest responsive and responsible bid for the project. Staff is recommending Ronnys Inc. be awarded the contract for the construction of the Sunrise Ranch Park. Staff is recommending a contingency of fifteen percent (15%).

Work includes site preparation, installation of landscape, playground equipment, concrete, fencing and an electrical pedestal. Work is anticipated to begin in October 2024 and a completion date of April 1, 2025 is anticipated. Project acceptance is anticipated following a maintenance period to be completed by June 30, 2025.

Staff anticipates hosting a Grand Opening for the Park in Summer 2025.

Fiscal Impact:

The project has available budget of $1,375,000.00. The total project, including contingency is anticipated to cost: $1,149,856.50.

Resolution
Bid Opening Sheet
Advertisement for Bids
Agreement
Vanessa Portillo, Finance Director
49 THIS PAGE IS INTENTIONALLY LEFT BLANK
50 RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF LOS BANOS AUTHORIZING THE CITY

MANAGER TO EXECUTE THE CONTRACT WITH
RONNYS INC. FOR THE CONSTRUCTION OF

SUNRISE RANCH PARK IN THE AMOUNT OF
$999,856.50 AND A PROJECT CONTINGENCY
OF $150,000.00
WHEREAS, the City of Los Banos solicited bids for the Construction of Sunrise Ranch Park located at 2053 Martin St.; and
WHEREAS, the Public Works Department has determined, after receiving competitive proposals, that Ronnys Inc. provided the lowest responsive and responsible proposal in the amount of $999,856.50; and
WHEREAS, the proposed construction project includes a 15% contingency in the amount of $150,000.00; and
WHEREAS, the proposed contract has been reviewed by the City Attorney and approved as to form; and
WHEREAS, the Public Works Department requests the City Council authorize the City Manager to execute the contract with Ronnys Inc. for the Construction of Sunrise Ranch Park.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby authorize the City Manager to execute the contract with Ronnys Inc. for the Construction of Sunrise Ranch Park.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member ___ who moved its adoption, which motion was duly seconded by Council Member ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:
51 APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
52 LOsBanos
At the Crossroads of California

BID OPENING

CONSTRUCTION OF SUNRISE RANCH PARK
September 6, 2024.

1. Ronny's Inc.

2. Graniterock

3. Westside Landscape & Concrete

4. TBS Contractors
Signed: ,2Uv\.Q,..___ru.

Sara Blevins
~ Assistant City Clerk/HR Analyst
Sarah Orozco
Engineering Technic n
$ 999,856.50
$1,524,037.15
$1,134,117.20
$1,460,430.18
Date: September 6, 2024
53 Advertisement for Bids

CITY OF LOS BANOS
520 J Street
Los Banos, California 93635
Notice is hereby given that separate sealed bids for the award of contract for the Construction of Sunrise Ranch Park will be received by the City of Los Banos at the office of the City Clerk until 2:00 p.m. Pacific Standard Time, September 6, 2024 and then at said office publicly opened and read aloud.

The major work consists of but is not limited to: demolition and site preparation; paving and hardscape; retaining and seat wall forming and installation, playground area with drain sumps; installation of playground area surfacing; site furnishing installation (including playground equipment, fencing, benches, etc.); landscape and irrigation improvements; and other site work.

The time for completion:

Construction complete with project acceptance to start maintenance by April 1, 2025 Maintenance with final project acceptance by June 30, 2025 The Contract Documents, in their entirety, can be viewed and/or obtained from the City of Los Banos website at www.losbanos.org or at the following locations:

Central California Builders Exchange (www.cencalbx.com) Builders Exchange of Stockton (www.besonline.com)
Valley Builders Exchange, Inc. (www.valleybx.com)
Builders Exchange of Santa Clara County (www.bxscco.com) Dodge Data & Analytics (www.construction.com/plans/)
A payment bond prepared and executed in accordance with California Civil Code Section 9550 and a bond for faithful performance of the contract will be required of the successful bidder who is awarded the contract.

The successful bidder must comply with the latest general prevailing rate of per diem wages as determined by the Director of Industrial Relations, State of California, Department of Industrial Relations and is to be paid to the various craftsmen and laborers required to construct said improvements and is made a part of the specifications and contract for said work to which reference is hereby made for further particulars.

No contractor or subcontractor may be listed on a bid proposal or awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractor registration information can be found at:
http://www.dir.ca.gov/Public-Works/PublicWorks.html
Each bid shall be accompanied by cashier's or certified check or by a bidder's bond, made payable to the City of Los Banos and executed by a corporate surety licensed to issue surety bonds in the State of California, for an amount equal to at least ten percent (10%) of the amount of said bid and no bid shall be considered unless such cashier's or certified check or bidder's 54 bond is enclosed therewith.

The successful bidder of this project shall have the following current and active California State Contractor's License at the time of the submission of the bid and throughout the duration of the contract: Class A or C-27. A C-27 bidder will also need to possess a C-61/O-34 or retain a subcontractor with a C-61/D-34 or Class A license for the installation of the playground and shade sail.

Prospective bidders are required to attend a mandatory pre-bid meeting on August 9, 2024 at 10 a.m.

Bids will not be considered from bidders who were not physically in attendance at the mandatory pre-bid meeting.

Bidders shall refer to the Contract Document's Information for Bidders for complete instructions.

Bidders are solely responsible for the cost of preparing their bids.

The City specifically reserves the right, in its sole discretion, to reject any or all bids, to re-bid, or to waive inconsequential defects, in bidding not involving time, or quality of the work. The City may reject any and all bids and waive any minor irregularities in the bids. 55 Agreement
THIS Agreement is dated as of the ____ day of ___ in the year 2024 by and between the City of Los Banos, a California municipal corporation ("Owner") and Ronnys Inc. ("Contractor").

Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:

1. WORK. Contractor shall complete the work indicated in Owner's Contract Documents entitled "SUNRISE RANCH PARK."
The work is generally described as follows:
• Construction of work consists of but is not limited to: demolition and site preparation; paving and hardscape; retaining and seat wall forming and installation, playground area with drain sumps; installation of playground area surfacing; site furnishing installation (including playground equipment, fencing, benches, etc.); landscape and irrigation improvements; and other site work. • Contractor shall furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the work described herein.

2. CONTRACT TIME. Contractor shall commence the work required by the Contract Documents within 10 calendar days after the date of the Notice to Proceed and will complete the same within the time period set forth in the bid, unless the period for completion is extended otherwise by the Contract Documents.

3. LIQUIDATED DAMAGES. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the work is not completed within the time specified in Paragraph 2 herein, plus any extensions thereof allowed in accordance with Paragraph 21, Time for Completion and Liquidated Damages, of the General Provisions. The parties also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by Owner if the work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner Eight Hundred Dollars ($ 800.00) for each day that passes after the time specified in Paragraph 2 herein.

4. CONTRACT PRICE. Owner shall pay Contractor for completion of the work in accordance with the Contract Documents in current funds the amount set forth in the Bid Schedule(s). The Contractor agrees to perform all of the work described in the Contract Documents for the unit and lump sum prices set forth in the Bid Schedule(s).

5. PAYMENT PROCEDURES. Contractor shall submit applications for payment in accordance with Paragraph 24, Progress Estimates, of the General Provisions. Applications for payment will be processed by Owner as provided in the General Provisions.

6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between Owner and Contractor concerning the work consists of this Agreement and the following attachments to this Agreement:
56 (A) Advertisement for Bids
(B) Information for Bidders
(C) Bid
(D) Bid Bond
(E) Agreement
(F) Payment Bond
(G) Performance Bond
(H) Notice of Award
(I) Notice to Proceed
(J) Change Order
(K) General Provisions
(L) Special Provisions
(M) Technical Specifications prepared by O'Dell Engineering a Westwood Company entitled "Sunrise Ranch Park", dated July, 2024. (N) Drawings prepared by O'Dell Engineering a Westwood Company numbered 1 through 22.
(0) Addenda
No. 1, dated August 21, 2024
No. 2, dated August 23, 2024
There are no Contract Documents other than those listed in this Paragraph 6. The Contract Documents may only be amended by change order as provided in Paragraph 19, Changes in the Work, of the General Provisions.

7. MISCELLANEOUS.

A. Terms used in this Agreement which are defined in Paragraph 1 of the General Provisions will have the meanings indicated in the General Provisions.

B. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

C. Owner and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents.

D. The Laws of the State of California shall govern this Agreement. Venue is Merced County. The provisions of this paragraph shall survive expiration or other termination of this Agreement regardless of the cause of such termination.

E. All bids become property of the Owner. All bids, including the accepted bid and 57 any subsequent contract become public records per the requirements of the California Government Code, Sections 6250-6270, "California Public Records Act". Proprietary material must be clearly marked as such. Pricing and service elements of the successful bid are not consider proprietary information. The Owner will treat all information submitted in a bid as available for public inspection once the Owner has selected a contractor. If you believe that you have a legally justifiable basis under the California Public Records Act (Government Section 6250 et. seq.) for protecting the confidentiality of any information contained within your bid, you must identify any such information, together with the legal basis of your claim in your bid. In order for the Owner to assess confidentiality of any such information on your behalf, you must request, execute and submit an Owner-prepared written agreement to defend and indemnify the Owner for any liability, costs, and expenses incurred in asserting such confidentiality as part of your bid. The final determination as to whether the Owner will assert your claim of confidentiality on your behalf shall be sole discretion of the Owner.

F. This Agreement shall not be interpreted in favor of any Party by virtue of said Party not having prepared this Agreement.

G. If any time period provided for in this Agreement ends on the day other than a Business Day, the time period shall be extended to the next Business Day.

IN WITNESS WHEREOF, Owner and Contractor have caused this Agreement to be executed the day and year first above written.

Date
ATTEST:

Lucille L. Mallonee
City Clerk

APPROVED AS TO
FORM:

William A. Vaughn
City Attorney
Date
By: ---------------- Authorized Representative of Owner Title: ----------------
By: - --- - ------- - --- Authorized Representative of
58 Contractor
Title:
(Seal if Corporation)
(Attach Acknowledgement for Authorized Representative of Contractor) 59 LOs Banos
lhe Crossroads of California

BID OPENING

CONSTRUCTION OF COMMUNITY CENTER PERIMETER FENCE
August 28, 2024 - 2:00 P.M.

1. Commonwealth General Contractors Corp.

2. Yukon Fence

3. Golden West Fence

4. Westside Landscape & Concrete

5. Ronny's Inc.

Signed~~-
Sara Blevins
Assistant City Clerk/HR Analyst
Engineering Technician
$ 162,710.00
$ 155,305.00
$161,935.38
$160,161.57
$144,741.00
Date: August 28, 2024
60 Agreement
THIS Agreement is dated as of the ____ day of ___ in the year 2024 by and between the City of Los Banos, a California municipal corporation ("Owner") and Ronnys Inc. ("Contractor").

Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:

1. WORK. Contractor shall complete the work indicated in Owner's Contract Documents entitled "Community Center Perimeter Fence."
The work is generally described as follows:
• Construction of installation and improvements of perimeter fence along the proposed fence line, as well gate entrance.
• Contractor shall furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the work described herein.

2. CONTRACT TIME. Contractor shall commence the work required by the Contract Documents within 10 calendar days after the date of the Notice to Proceed and will complete the same within the time period set forth in the bid, unless the period for completion is extended otherwise by the Contract Documents.

3. LIQUIDATED DAMAGES. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the work is not completed within the time specified in Paragraph 2 herein, plus any extensions thereof allowed in accordance with Paragraph 21, Time for Completion and Liquidated Damages, of the General Provisions. The parties also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by Owner if the work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner Eight Hundred Dollars($ 800.00) for each day that passes after the time specified in Paragraph 2 herein.

4. CONTRACT PRICE. Owner shall pay Contractor for completion of the work in accordance with the Contract Documents in current funds the amount set forth in the Bid Schedule(s). The Contractor agrees to perform all of the work described in the Contract Documents for the unit and lump sum prices set forth in the Bid Schedule(s).

5. PAYMENT PROCEDURES. Contractor shall submit applications for payment in accordance with Paragraph 24, Progress Estimates, of the General Provisions. Applications for payment will be processed by Owner as provided in the General Provisions.

6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between Owner and Contractor concerning the work consists of this Agreement and the following attachments to this Agreement:
(A) Advertisement for Bids
61 (8) Information for Bidders
(C) Bid
(D) Bid Bond
(E) Agreement
(F) Payment Bond
(G) Performance Bond
(H) Notice of Award
(I) Notice to Proceed
(J) Change Order
(K) General Provisions
(L) Special Provisions
(M) Technical Specifications
(N) Drawings prepared by Precision Civil Engineering, Inc. numbered 1 through 1. (0) Addenda
No. 1, dated August 15, 2024
There are no Contract Documents other than those listed in this Paragraph 6. The Contract Documents may only be amended by change order as provided in Paragraph 19, Changes in the Work, of the General Provisions.

7. MISCELLANEOUS.

A. Terms used in this Agreement which are defined in Paragraph 1 of the General Provisions will have the meanings indicated in the General Provisions.

B. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

C. Owner and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents.

D. The Laws of the State of California shall govern this Agreement. Venue is Merced County. The provisions of this paragraph shall survive expiration or other termination of this Agreement regardless of the cause of such termination.

E. All bids become property of the Owner. All bids, including the accepted bid and any subsequent contract become public records per the requirements of the California Government Code, Sections 6250-6270, "California Public Records Act". Proprietary material must be clearly marked as such. Pricing and service elements of the successful bid are not consider proprietary information. The Owner will treat all information submitted in a bid as available for public inspection once the Owner has selected a contractor. If you believe that you have a legally justifiable basis under the California Public Records Act 62 (Government Section 6250 et. seq.) for protecting the confidentiality of any information contained within your bid, you must identify any such information, together with the legal basis of your claim in your bid. In order for the Owner to assess confidentiality of any such information on your behalf, you must request, execute and submit an Owner-prepared written agreement to defend and indemnify the Owner for any liability, costs, and expenses incurred in asserting such confidentiality as part of your bid. The final determination as to whether the Owner will assert your claim of confidentiality on your behalf shall be sole discretion of the Owner.

F. This Agreement shall not be interpreted in favor of any Party by virtue of said Party not having prepared this Agreement.

G. If any time period provided for in this Agreement ends on the day other than a Business Day, the time period shall be extended to the next Business Day.

IN WITNESS WHEREOF, Owner and Contractor have caused this Agreement to be executed the day and year first above written.

Date
ATTEST:

Lucille L. Mallonee
City Clerk
APPROVED AS TO FORM:

William A. Vaughn
City Attorney
Date
(Seal if Corporation)
By:

Title:

By:

Title:
- - - ------------- Authorized Representative of Owner
- ---------------
---------------- Authorized Representative of Contractor ----------------
(Attach Acknowledgement for Authorized Representative of Contractor) 63 Advertisement for Bids

CITY OF LOS BANOS
520 J Street
Los Banos, California 93635
Notice is hereby given that separate sealed bids for the award of contract for the Construction of Community Center Perimeter Fence will be received by the City of Los Banos at the office of the City Clerk until 2:00 p.m. PDT, August 28, 2024 and then at said office publicly opened and read aloud.

The major work consists of installation and improvements of perimeter fence along the proposed fence line, as well gate entrance.

The time for completion shall be forty-five (45) working days.

The Contract Documents, in their entirety, can be viewed and/or obtained from the City of Los Banos website at www.losbanos.org or at the following locations:

Central California Builders Exchange (www.cencalbx.com) Builders Exchange of Stockton (www.besonline.com)
Valley Builders Exchange, Inc. (www.valleybx.com)
Builders Exchange of Santa Clara County (www.bxscco.com) Dodge Data & Analytics (www.construction.com/plans/)
A payment bond prepared and executed in accordance with California Civil Code Section 9550 and a bond for faithful performance of the contract will be required of the successful bidder who is awarded the contract.

The successful bidder must comply with the latest general prevailing rate of per diem wages as determined by the Director of Industrial Relations, State of California, Department of Industrial Relations and is to be paid to the various craftsmen and laborers required to construct said improvements and is made a part of the specifications and contract for said work to which reference is hereby made for further particulars.

No contractor or subcontractor may be listed on a bid proposal or awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractor registration information can be found at:
http://www.dir.ca.gov/Public-Works/PublicWorks.html
Each bid shall be accompanied by cashier's or certified check or by a bidder's bond, made payable to the City of Los Banos and executed by a corporate surety licensed to issue surety bonds in the State of California, for an amount equal to at least ten percent (10%) of the amount of said bid and no bid shall be considered unless such cashier's or certified check or bidder's bond is enclosed therewith.

The successful bidder of this project shall have the following current and active California State Contractor's License at the time of the submission of the bid and throughout the duration of the contract: C-13.
64 Prospective bidders are required to attend a mandatory pre-bid meeting on August 7, 2024 at 2 p.m. at 645 Seventh Street, Los Banos, CA 93635.

Bids will not be considered from bidders who were not physically in attendance at the mandatory pre-bid meeting.

Bidders shall refer to the Contract Document's Information for Bidders for complete instructions.

Bidders are solely responsible for the cost of preparing their bids.

The City specifically reserves the right, in its sole discretion, to reject any or all bids, to re-bid, or to waive inconsequential defects, in bidding not involving time, or quality of the work. The City may reject any and all bids and waive any minor irregularities in the bids. 65 THIS PAGE IS INTENTIONALLY LEFT BLANK
66 ITEM 7F
67 TO:

FROM:

DATE:

LOsBanos , ,ad of :di , n1ia
Agenda Staff Report
Mayor and City Council Members
Joe Heim, Parks and Recreation DirectorF'
September 18, 2024
TYPE OF REPORT: Consent Agenda
SUBJECT: Authorizing Award of Construction to Ronnys Inc. in the amount of $144,741 .00 for the construction of the Community Center Perimeter Fence
Recommendation:

That the City Council adopts the Resolution awarding the Construction Contract to Ronnys Inc. and authorize the City Manager to execute the Construction Contract agreement in the amount of $144,741.00. Staff is requesting a 15% contingency of $21,700.00 for a total project budget of $166,441.00.

Background:

The Los Banos Community Center, located at 645 7th St., was constructed in 2009 and is one of the premier City-owned buildings.

The facility is utilized by all age groups and features amenities such as bocce ball courts, bench seating, courtyard space and parking.

The perimeter fence project would install a 6 foot fence around the perimeter of the east, south and west sides of the facility. The fence would be located along the inside path of the Rail Trail on the south side and connect to the building on the west and east ends.

The overflow parking lot would be enclosed with a gate connecting to the adjacent property. Gate access would also be located along connecting sidewalks.

A perimeter fence will increase security on-site and help to protect the facility from vandalism. The fence is also anticipated to create activity on the under-utilized south side 67 of the building. The project includes a 6' flat top tan iron fence to be installed along the perimeter of the project.

Staff held a bid opening for the construction of a fence at the Community Center on June 18, 2024, however, bids were rejected on July 17, 2024. The bid price for that project was $224, 124.85.

Staff opened a bid for the Construction of the Community Center Perimeter Fence on August 28, 2024.

Discussion:

The Public Works Department, through the office of the City Clerk, received five (5) bids from the following contractors:

Contractor Location Amount
Commonwealth General Contractors Turlock, CA $162,710.00 Corp.

Yukon Fence Co. Bakersfield, CA $155,305.00
Golden West Fence Nuevo, CA $161,935.38
Westside Landscape & Concrete, Newman, CA $160,161.57
Inc.

Ronnys Inc. Los Banos, CA $144,741.00
Staff reviewed each of the bid proposals for completeness. Ronnys Inc. has provided the lowest responsive and responsible bid for the project. Staff is recommending Ronnys Inc. be awarded the contract for the construction of the Community Center Perimeter Fence project. Staff is recommending a 15% contingency in the amount of $21,700.00 for the project.

Staff anticipates a project start date of October, 2024 and completion in winter 2024-2025.

Fiscal Impact:

The project has been budgeted in account 244-410-100-720 for the amount of $175,000.00. The bid amount for the recommended project is $144,741.00, with a $21,700.00 contingency amount. The total project cost is anticipated to be $166,441.00.

Vanessa Portillo, Finance Director
Attachments:

Resolution
Bid Opening Sheet
68 Advertisement of Bids
Agreement
Plan Sheet
69 THIS PAGE IS INTENTIONALLY LEFT BLANK
70 RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF LOS BANOS AUTHORIZING THE CITY

MANAGER TO EXECUTE THE CONTRACT WITH
RONNYS INC. FOR THE CONSTRUCTION OF

THE COMMUNITY CENTER PERIMETER FENCE
PROJECT IN THE AMOUNT OF $141,741.00 AND
A PROJECT CONTINGENCY OF $21,700.00
WHEREAS, the City of Los Banos solicited bids for the Construction of the Community Center Perimeter Fence Project located at 645 7th St..; and WHEREAS, the Public Works Department has determined, after receiving competitive proposals, that Ronnys Inc. provided the lowest responsive and responsible proposal in the amount of $144,741.00; and
WHEREAS, the proposed construction project includes a 15% contingency in the amount of $21,700.00; and
WHEREAS, the proposed contract has been reviewed by the City Attorney and approved as to form; and
WHEREAS, the Public Works Department requests the City Council authorize the City Manager to execute the contract with Ronnys Inc. for the Construction of the Community Center Perimeter Fence Project.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby authorize the City Manager to execute the contract with Ronnys Inc. for the Construction of the Community Center Perimeter Fence Project.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member ___ who moved its adoption, which motion was duly seconded by Council Member ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:
71 APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
72 LOs Banos , the Crossroads of California

BID OPENING

CONSTRUCTION OF COMMUNITY CENTER PERIMETER FENCE
August 28, 2024 - 2:00 P.M.
1 . Commonwealth General Contractors Corp.

2. Yukon Fence

3. Golden West Fence

4. Westside Landscape & Concrete

5. Ronny's Inc.

Signed~~.

Sara Blevins
Assistant City Clerk/HR Analyst
Engineering Technician
$162,710.00
$ 155,305.00
$ 161 ,935.38
$ 160,161 .57
$144,741 .00
Date: August 28, 2024
73 Agreement
THIS Agreement is dated as of the _ ___ day of ___ in the year 2024 by and between the City of Los Banos, a California municipal corporation ("Owner") and Ronnys Inc. ("Contractor").

Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:

1. WORK. Contractor shall complete the work indicated in Owner's Contract Documents entitled "Community Center Perimeter Fence."
The work is generally described as follows:
• Construction of installation and improvements of perimeter fence along the proposed fence line, as well gate entrance.
• Contractor shall furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the work described herein.

2. CONTRACT TIME. Contractor shall commence the work required by the Contract Documents within 10 calendar days after the date of the Notice to Proceed and will complete the same within the time period set forth in the bid, unless the period for completion is extended otherwise by the Contract Documents.

3. LIQUIDATED DAMAGES. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the work is not completed within the time specified in Paragraph 2 herein, plus any extensions thereof allowed in accordance with Paragraph 21, Time for Completion and Liquidated Damages, of the General Provisions. The parties also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by Owner if the work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner Eight Hundred Dollars ($ 800.00) for each day that passes after the time specified in Paragraph 2 herein.

4. CONTRACT PRICE. Owner shall pay Contractor for completion of the work in accordance with the Contract Documents in current funds the amount set forth in the Bid Schedule(s). The Contractor agrees to perform all of the work described in the Contract Documents for the unit and lump sum prices set forth in the Bid Schedule(s).

5. PAYMENT PROCEDURES. Contractor shall submit applications for payment in accordance with Paragraph 24, Progress Estimates, of the General Provisions. Applications for payment will be processed by Owner as provided in the General Provisions.

6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between Owner and Contractor concerning the work consists of this Agreement and the following attachments to this Agreement:
(A) Advertisement for Bids
74 (8) Information for Bidders
(C) Bid
(D) Bid Bond
(E) Agreement
(F) Payment Bond
(G) Performance Bond
(H) Notice of Award
(I) Notice to Proceed
(J) Change Order
(K) General Provisions
(L) Special Provisions
(M) Technical Specifications
(N) Drawings prepared by Precision Civil Engineering, Inc. numbered 1 through 1. (0) Addenda
No. 1, dated August 15, 2024
There are no Contract Documents other than those listed in this Paragraph 6. The Contract Documents may only be amended by change order as provided in Paragraph 19, Changes in the Work, of the General Provisions.

7. MISCELLANEOUS.

A. Terms used in this Agreement which are defined in Paragraph 1 of the General Provisions will have the meanings indicated in the General Provisions.

8. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

C. Owner and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents.

D. The Laws of the State of California shall govern this Agreement. Venue is Merced County. The provisions of this paragraph shall survive expiration or other termination of this Agreement regardless of the cause of such termination.

E. All bids become property of the Owner. All bids, including the accepted bid and any subsequent contract become public records per the requirements of the California Government Code, Sections 6250-6270, "California Public Records Act". Proprietary material must be clearly marked as such. Pricing and service elements of the successful bid are not consider proprietary information. The Owner will treat all information submitted in a bid as available for public inspection once the Owner has selected a contractor. If you believe that you have a legally justifiable basis under the California Public Records Act 75 (Government Section 6250 et. seq.) for protecting the confidentiality of any information contained within your bid, you must identify any such information, together with the legal basis of your claim in your bid. In order for the Owner to assess confidentiality of any such information on your behalf, you must request, execute and submit an Owner-prepared written agreement to defend and indemnify the Owner for any liability, costs, and expenses incurred in asserting such confidentiality as part of your bid. The final determination as to whether the Owner will assert your claim of confidentiality on your behalf shall be sole discretion of the Owner.

F. This Agreement shall not be interpreted in favor of any Party by virtue of said Party not having prepared this Agreement.

G. If any time period provided for in this Agreement ends on the day other than a Business Day, the time period shall be extended to the next Business Day.

IN WITNESS WHEREOF, Owner and Contractor have caused this Agreement to be executed the day and year first above written.

Date
ATTEST:

Lucille L. Mallonee
City Clerk
APPROVED AS TO FORM:

William A. Vaughn
City Attorney
Date
(Seal if Corporation)
By: ------------ - - -- Authorized Representative of Owner Title: --------------- -
By: --- - ----- - --- - -- Authorized Representative of Contractor Title: ----------------
(Attach Acknowledgement for Authorized Representative of Contractor) 76 Advertisement for Bids

CITY OF LOS BANOS
520 J Street
Los Banos, California 93635
Notice is hereby given that separate sealed bids for the award of contract for the Construction of Community Center Perimeter Fence will be received by the City of Los Banos at the office of the City Clerk until 2:00 p.m. PDT, August 28, 2024 and then at said office publicly opened and read aloud.

The major work consists of installation and improvements of perimeter fence along the proposed fence line, as well gate entrance.

The time for completion shall be forty-five (45) working days.

The Contract Documents, in their entirety, can be viewed and/or obtained from the City of Los Banos website at www.losbanos.org or at the following locations:

Central California Builders Exchange (www.cencalbx.com) Builders Exchange of Stockton (www.besonline.com)
Valley Builders Exchange, Inc. (www.valleybx.com)
Builders Exchange of Santa Clara County (www.bxscco.com) Dodge Data & Analytics (www.construction.com/plans/)
A payment bond prepared and executed in accordance with California Civil Code Section 9550 and a bond for faithful performance of the contract will be required of the successful bidder who is awarded the contract.

The successful bidder must comply with the latest general prevailing rate of per diem wages as determined by the Director of Industrial Relations, State of California, Department of Industrial Relations and is to be paid to the various craftsmen and laborers required to construct said improvements and is made a part of the specifications and contract for said work to which reference is hereby made for further particulars.

No contractor or subcontractor may be listed on a bid proposal or awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractor registration information can be found at:
http://www.dir.ca.gov/Public-Works/PublicWorks.html
Each bid shall be accompanied by cashier's or certified check or by a bidder's bond, made payable to the City of Los Banos and executed by a corporate surety licensed to issue surety bonds in the State of California, for an amount equal to at least ten percent ( 10%) of the amount of said bid and no bid shall be considered unless such cashier's or certified check or bidder's bond is enclosed therewith.

The successful bidder of this project shall have the following current and active California State Contractor's License at the time of the submission of the bid and throughout the duration of the contract: C-13.
77 Prospective bidders are required to attend a mandatory pre-bid meeting on August 7, 2024 at 2 p.m. at 645 Seventh Street, Los Banos, CA 93635.

Bids will not be considered from bidders who were not physically in attendance at the mandatory pre-bid meeting.

Bidders shall refer to the Contract Document's Information for Bidders for complete instructions.

Bidders are solely responsible for the cost of preparing their bids.

The City specifically reserves the right, in its sole discretion, to reject any or all bids, to re-bid, or to waive inconsequential defects, in bidding not involving time, or quality of the work. The City may reject any and all bids and waive any minor irregularities in the bids. 78 I
I
i
I
I
LEGE~N~D __________ _

PROPOSED IMPROVEMENTS
11· tJl:JIM.l _, fJIIWC ovr l'fll. irw. ~-
IZ' SN:u - ll'l'tf" i:Alf IP IVNI t"
-~~K/100.U.1/'

CONSTRUCTION NOTES
,__.,..

D-MfltM'!'
,.!!!
-Ill
· ----161,f'
~tr-Mot,
0Ufl'f1f«w TlllOt' ,\
0 ll~S!!f~\
.?:/if&.
/lflOPCSrOf'..::f" . ~Mm'~ ·rmoir
DSM:~/

ADJACENT PROPERTY
I I 11
.,_, ~ .... ,,.I)_, ... /1'-f') ..,.,.,,
:.;.tf' ... ,..,
l.l - l LI.

II II
j o\\- .. ,..,.,.,,.,. _ .,,._
11 I
11 I I I ,
--below.

Calh1111i1111p c11g.
0'!>0..,...lr, MO
t:H:Clllflf" OY
,..,._,
I It 'A'
~ · 12'DOU8LESWINGDRIVEGATE 0 8 4'PEDESTRIANGATE! C 12'$/NGLESWINGD IVEGATE! _ _ ' ,, "' ' l w• ====-==================-====-=-=====oa::::======-==-=======---------=--=-=------=-===-=--==-----------------...w--·· .. • .... "=....i 79 THIS PAGE IS INTENTIONALLY LEFT BLANK
80 ITEM 7G
81 LOsBanos
At the Crossroads o.f Calijornia
Agenda Staff Report
TO: Mayor & City Council Members
FROM:

DATE: September 18, 2024
TYPE OF REPORT: Consent Agenda
SUBJECT: Authorizing Award of Bid for the Purchase of a 2024 ¾ Ton Medium Duty Utility Truck with Lumber Rack- Bid No. 25ST0012
Recommendation:

That the City Council adopts the Resolution to award the bid for the purchase of a 2024 ¾ Ton Medium Duty Utility Truck with Lumber Rack in the amount of $66,896.26; and authorize a purchase order to be issued to Santos Ford in the amount of $66,896.26 for the purchase of a 2024 ¾ Ton Medium Duty Utility Truck with Lumber Rack.

Discussion:

In connection with the 2024-2025 Fiscal Year Budget, the City Council approved the City's Capital Plan which included the purchase of a ¾ Ton Medium Duty Utility Truck with a Lumber Rack for its fleet. Bid documents for the purchase of a New 2024/2025 Model ¾ Ton Medium Duty Utility Truck with Lumber Rack Bid No. 25ST0012 were released on Wednesday, July 31, 2024. A public notice was advertised on Wednesday, July 31, 2024 in the Westside Express. The bid opening occurred on Thursday, August 22, 2024. The Public Works Department, through the office of City Clerk, received two {2) sealed bids.

The following dealerships responded to the City's invitation:

McAuley Ford
Santos Ford
$66,423.08
$66,896.26
After review of the submitted bid documents, it was determined that Santos Ford was able to meet all the specifications outlined in the bid package; therefore, making their bid the responsive and responsible bid. Santos Ford can claim the local business preference of five percent. The truck is also included in their inventory and is available for delivery as 81 soon as the purchase order is issued; therefore, staff is requesting awarding the purchase order to Santos Ford for their total bid price in the amount of $66,896.26.

This vehicle will be utilized by the Streets division. The truck acquisition will help support the City's growing maintenance staff and assist in the routine Public Works maintenance including sidewalk repair and replacement.

Fiscal Impact:

Funds have been allocated in the 2024-2025 Fiscal Year budget for this purchase within the General Fund Streets account 100-431-210-750.

Attachments:

Resolution
Public Notice
Bid Opening Sheet
Fiscal Budget Sheet
Truck Sample Picture
Vanessa Portillo, Finance Director
82 RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LOS BANOS AWARDING THE
BID FOR THE PURCHASE OF A NEW 2024 ¾

TON MEDIUM DUTY UTILITY TRUCK WITH
LUMBER RACK; AND AUTHORIZE TO ISSUE

A PURCHASE ORDER
WHEREAS, the City of Los Banos has the responsibility to procure, manage, and maintain the City's fleet; and
WHEREAS, the City of Los Banos received sealed bids for the purchase of a 2024 ¾ Ton Medium Duty Utility Truck with Lumber Rack that were officially opened on Thursday, August 22, 2024; and
WHEREAS, it was determined that Santos Ford provided a responsive and responsible bid of $66,896.26.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby accept the bid of $66,896.26 from Santos Ford for the purchase of a 2024 ¾ Ton Medium Duty Utility Truck with Lumber Rack; and authorize to issue the purchase order.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member ___ who moved its adoption, which motion was duly seconded by Council Member ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
83 When recorded mail to:

CITY OF LOS BANOS

PUBLIC WORKS DEPARTMENT
411 MADISON AVENUE
LOS BANOS, CA 93635

PROOF OF PUBLICATION
(2015.5 C. C. P.)

STATE OF CALIFORNIA,
County of Merced,
I am a citizen of the United States and a resident of
the county aforesaid; I am over the age of
twenty-one years, and not a party to or interested
in the above entitled . matter. I am the principal
clerk of THE WESTSIDE EXPRESS, P.O. Box
2422, Los Banos, CA 93635, a newspaper of general
circulation, published in Los Banos, California in the
City of Los Banos, County of Merced, and which
newspaper has been adjudged a newspaper of general
circulation, by the Superior Court of the County of
Merced, State of California. That the notice, of which
the annexed is a printed copy (set in type not smaller
than nonpareil), has been published in each regular
and entire issue of said newspaper and not in any
supplement thereof on the following dates, to-wit:

July 31, 2024
I certify or declare under penalty of perjury that the
foregoing is true and correct.

Dated at Los Banos,
This July 31, 2024
. tdcwi~ Ou,aiJ Signature
This space is for the County Clerk's Filing Stamp
Proof of Publication of

PUBLIC NOTICE

PUBLIC NOTICE

INVJTATION FOR SEALED BIDS

CITY OF LOS BANOS

PUBLIC WORKS DEPARTMENT
411 Madison Avenue
Los Banos, CA 93635 .
(209) B27•7056
NOTICE IS HEREBY GIVEN that the LOS

BANOS PUBLIC WORKS DEPARTMENT
(herein called the •Owner") Invites and will
receive sealed bids up to the hour of 2:00
p.m. Pacific Daylight Savings Time
(POT) on Thursday, August 22. 2024 for
the purchase of One (1) New 2024/2025
Model.¾ Ton Medium Duty Utility Truck·
with Lumber Rack. At said time, sealed Bid
Proposal (herein called the "Bid") will be
publicly opened and read aloud in the City
of Los Banos Council Chambers by the officj!
of the City Clerk at
Los 8aftos City Hall
520"J"snet
Los a.nos. Callfomla 93635 I
Questions regarding the Bid Documents •
are to be directed to Dan Bronson, Publk
Works Fleet COO!dinator, by email at an,.
bronsonflk!tbln919r
Bids shall be submitted only on forms
provided In the Bid Packet Bids shall be In
the hands of the City Clerk of the City of Los
Banos. 520 J Street. Los Banos, California,
93635 on or before the hour of 2.-00 p.m.

PDT on Thursday, Auguat 22, 2024. No late
Bids will be accepted and will be returned
unopened. No oral, telegraphic, electronic,
facsimile, or telephone bid submlttals or
modifications will be considered. Bids
received after the bid submittal deadline
will be rejected and returned to the Bidder
unopened.

The · Bid Proposal forms can be obtained
from the City of Los Banos website at WWW.
k>lbanos,orq,
The City of Los Banos reserves the right to
.reject any and/or all Bids received.

July 31, 2024
WE<~24-128
84 LOsBanos
t the Crossroads of California

BID OPENING
BID NO. 25ST0012
Purchase of One (1) New 2024/ 2025 Model¾ Ton Medium Duty Utility Truck with lumber Rack August 22, 2024 -2:00 p.m.

1. McAuley Ford

2. Santos Ford
Signed:~ ~_Q_
Administrative Coordinator
Carlos Granillo
Public Works Operations Manager
$66,423.08
$66,896.26
Dated: August 22, 2024
85 Account Number
100-431-210-740
100-43 l-2,L0-150
100-431-210-752
100-431-210-753
100-431 -210-755
100-431-210-770
100-431-210-825
City of Los Banos
Streets
2024-2025
2021-2022
Description Actual
Miscellaneous Equipment
\ 'd11d~~ 49.56
Communication Equipment 256,66
Specialized Equipment 303,124.63
Specialized Vehicles 102.74
Computer Equipment
Capital Outlay Total: 547,086.14
Street Charge-Out (2J 07,595.94)
Charge Ins - Outs Total: (2,307,595.94)
Total Streets
221
2022-2023 2023-2024 2024-2025
Actual Estimated Adoeted
241,296.87 5,100.34 103,500 00
160,990.43 44,193.34 48,000.00
67,604.97 130,427.69
150.12
591,882.35 1,803,056.16 1,786,500.00
(2.6I91926.08) !2,434,835.78) {4,035,736.54)
(2,619,926.08) (2,434,835.78) (4,035, 736.54)
~JJs,gz J,42J,J J2.,l!i
86 Streets (continued)

CAPITAL OUTLAY
715-STREET & ROAD IMP-OVERLAY: Costs associated with the SBI overlays ($1,000,000).

Costs also associated for thermoplastic striping throughout the City ($100,000). 718-SIDEW ALK IMPROVEMENT: Costs associated with the installation of 4 ADA comers behind Grasslands Elementary School ($20,000).
720-BUILDINGS & STRUCTURES: Costs associated F Street Yard Fencing (Costs shared between Streets $33,000, Parks $33,000, & Solid Waste $34,000), Automatic Gate at the Public Works Bone Yard (Costs shared between Streets $17,000, Parks $17,000, & Solid Waste $1 7,000), Design for the reconstruction of the F Street Locker Room (Costs shared between Streets $5,000, Parks $5,000, & Solid Waste $5,000).
726-MISCELLANEOUS IMPROVEMENTS: Expenses related for pavement improvements at the F Street Maintenance Yard (costs shared between Streets $85,000, Maintenance $85,000, and Solid Waste $85,000), Paving of the Public Parking Lot on 7th Street ($125,000), and Design and Reconstruction of 3 Downtown Alleys at $250,000.
750-VEHICLES: Purchase of a ¼ ton Utility ickup Truck ($85,000), Toyota Prius (cost shared between Streets $18,500 and Solid Waste $18,500) with a grant reimbursement of $20,000 from SJVAPCD.
753-SPECIALIZED EQUIPMENT: Purchase of an enclosed trailer for the Sidewalk Grinder ($15,000), Trailer 16,000 GVWTR for the Asphalt Roller ($18,000) and SCADA System (cost shared between Water $45,000, Collections $45,000, Treatment $45,000 and Streets $15,000).

CHARGE-OUTS
825-CHARGE-OUT: Street charge-outs to RSTP, Solid Waste Refuse Vehicle Impact, and Gas Tax (includes SBl allocations).
223
87 88
89 ITEM 7H
LOsBanos
he Crossroads of California
Agenda Staff Report
TO: Mayor & City Council Members
FROM: Charles Bergson, P.E., Public Works Director/City En DATE: September 18, 2024
TYPE OF REPORT: Consent Agenda
SUBJECT: Authorizing Award of Bid for the Purchase of a 2024 Model¾ Ton Medium Duty Utility Truck - Bid No. 25WA0018
Recommendation:

That the City Council adopts the Resolution to award the bid for the purchase of a 2024 Model ¾ Ton Medium Duty Utility Truck in the amount of $65,808.76; and authorize a purchase order to be issued to Santos Ford in the amount of $65,808.76 for the purchase of a 2024 Model¾ Ton Medium Duty Utility Truck.

Discussion:

In connection with the 2024-2025 Fiscal Year Budget, the City Council approved the City's Capital Plan which included the purchase of a ¾ Ton Medium Duty Utility Truck for its fleet. Bid documents for the purchase of a New 2024/2025 Model ¾ Ton Medium Duty Utility Truck Bid No. 25WA0018 were released on Wednesday, July 31, 2024. A public notice was advertised on Wednesday, July 31, 2024 in the Westside Express. The bid opening occurred on Thursday, August 22, 2024. The Public Works Department, through the office of City Clerk, received two (2) sealed bids. The following dealerships responded to the City's invitation:

McAuley Ford
Santos Ford
$65,039.79
$65,808.76
After review of the submitted bid documents, it was determined that Santos Ford was able to meet all the specifications outlined in the bid package; therefore, making their bid the responsive and responsible bid. Santos Ford can claim the local business preference of five percent. This truck is also included in their inventory and it is available for delivery as 89 soon as the purchase order is issued; therefore, staff is requesting awarding the purchase order to Santos Ford for their total bid price in the amount of $65,808.76.

This vehicle will be utilized by the Water and Wastewater division of Public Works. This truck will replace Unit #4219 a 2014 Utility Truck with 142,758 miles. Maintenance costs, local driving miles/idle time, and reliability contribute to the decision of this replacement.

Fiscal Impact:

Funds have been allocated in the 2024-2025 Fiscal Year budget for this purchase within the Water Fund accou.nt 501-461-100-750 and Wastewater Collections Fund account 502-432-100-750.

Reviewed by:

Jo
Attachments:

Resolution
Public Notice
Bid Opening Sheet
Fiscal Budget Sheet
Truck Sample Picture
Vanessa Portillo, Finance Director
90 RESOLUTION NO. __

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LOS BANOS AWARDING THE
BID FOR THE PURCHASE OF A NEW 2024 ¾
TON MEDIUM DUTY UTILITY TRUCK; AND

AUTHORIZE TO ISSUE A PURCHASE ORDER
WHEREAS, the City of Los Banos has the responsibility to procure, manage, and maintain the City's fleet; and
WHEREAS, the City of Los Banos received sealed bids for the purchase of a 2024/2025 Model ¾ ton Medium Duty Utility Truck that were officially opened on Thursday,August22,2024;and
WHEREAS, it was determined that Santos Ford provided a responsive and responsible bid of $65,808.76.

NOW, THERE:FORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby accept the bid of $65,808.76 from Santos Ford for the purchase of a 2024 Model ¾ Ton Medium Duty Utility Truck; and authorize to issue the purchase order.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member ___ who moved its adoption, which motion was duly seconded by Council Member _ _ _ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
91 When recorded mail to:

CITY OF LOS BANOS

PUBLIC WORKS DEPARTMENT
411 MADISON AVENUE
LOS BANOS, CA 93635

PROOF OF PUBLICATION
(2015.5 C. C. P.)

STATE OF CALIFORNIA,
County of Merced,
I am a citizen of the United States and a resident of
the county aforesaid; I am over the age of
twenty-one years, and not a party to or interested
in the above entitled matter. I am the principal
clerk of THE WESTSIDE EXPRESS, P.O. Box
2422, Los Banos, CA 93635, a newspaper of general
circulation, published in Los Banos, California in the
City of Los Banos, County of Merced, and which
newspaper has been adjudged a newspaper of general
circulation, by the Superior Court of the County of
Merced, State of California. That the notice, of which
the annexed is a printed copy ( set in type not smaller than nonpareil), has been published in each regular
and entire issue of said newspaper and not in any
supplement thereof on the following dates, to-wit:

July 31, 2024
I certify or declare under penalty of perjury that the
foregoing is true and correct.

Dated at Los Banos,
This July 31, 2024
Signature ~a~~
This space is for the County Clerk's Filing Stamp
Proof of Publication of

PUBLIC NOTICE

PUBLIC NOTICE
INVITATIONfOR SEALED BIDS

CITY OF LOS BANOS

PUBLIC WORKS DEPARTMENT
411 Madison Avenue
Los Banos, CA 93635
(209) 827-7056
NOTICE IS HEREBY GIVEN that the LOS

BANOS PUBLIC WORKS DEPARTMHIT
(herein called the "Owner"). invites and wm
receive sealed bids up to the hour of 2:00
p.m. Pacific Daylight Savings Tlme
(PDT} on Thursday, August 22, 2024 for
the purchase of One (1) New 2024/2025
Model¾ Ton Medium Duty UtllltyTruck.

At said time; ~aled Bid Proposal (herein
called the "Bid") will be publicly opened and
read aloud In the City of Los Banos Council
Chambers by the office of the
City Clerk at:

Los Banos City Hall
s20-J"StrNt
Los Banos, Callfomla 93635
Questions regarding the Bid Documents
are to be directed to Dan Bronson, Public
works Fleet Coordinator. by email at .dill.
b[[email protected],
Bids shall be submitted only on fonns
provided in the Bid Packet. Bids shall be In
.Jhe.~afthe
City Clerk of the City of Los Banos, 520
J Street. Los Banos. Callfomla, 93635 on
or before the hour of 2:00 p.m. POT on
J1Msc11Y, AygUlt 22. 2024, No late Bids
will be accepted and will be returned
unopened. No oral, telegraphic, electronic,
facsimile, or telephone bid submittals or
modifications will be considered. Bids
received after the bid submittal deadllne
will be rejected and returned to the Bidder
unopened.

The Bid Proposal forms can be obtained
from the Oty of Los Banos website at ow.
k>sbanos,org,
The City of Los Banos reserves the right to
reject any and/or all Bids received.

July 31, 2024
WEX#24-126
92 LOsBanos
Ar the Crossroads of California

BID OPENING
BID NO. 25WT0018
Purchase of One (1) New 2024/2025 Model¾ Ton Medium Duty Utility Truck August 22, 2024 - 2:00 p.m.

1. McAuley Ford

2. Santos Ford
Signed: ~ ~2. Martha razil
Administrative Coordinator
Carlos Granillo
Public Works Operations Manager
$65,039.79
$65,808.76
Dated: August 22, 2024
93 Account Number
501-461-100-739
50 1-46 1-100-750
501-461-100-752
501-461-100-753
501-461-100-755
501-461-100-770
501-495-100-900
City of Los Banos
Water
2024-2025
2021-2022
Description Actual
Master Plan Improvements 74,687.72
Vehicles 49.56
Communication Equipment 271.68
Specialized Equipment
Specialized Vehicles 62,958.54
Computer Equipment .

Capital Outlay Total: 270,127.87
Contingency
Contingency Total:

Total Water: 3,592J38.16
233
2022-2023 2023-2024 2024-2025
Actual Estimated Adopted
1,533,144.02 89,616.83 7,111,000.00
80,028.18 68,272.22 I 8,50.0.00
3,514.18
8,191.55 113,151.47 69,500.00
65,213 .84 200,000.00
4,822.80 50,000.00
1,882,329.84 664,236.54 8,245,100.00
100 000.00 ';j
100,000.00
5,444,818.27 4,718,081.03 13,951 ,872,01
94 Water (continued)
267-GENERAL MATERIALS & SUPPLIES: Materials and supplies utilized by Operations personnel for the general water distribution materials and supplies including pipes, valves, fittings, service lines, meters, meter boxes, etc. Water production materials and supplies incJuding chemicals (fluoride and chlorine), field water quality analysis supplies, materials used at the City laboratory for water quality analysis, and repair parts for pumps and electric motors for the wells & chemical feed equipment. Asphalt repair following repair of underground distribution facilities. 273-SPECIAL DEPARTMENTAL EXPENSES: For miscellaneous safety equipment and employee longevity awards.

CAPITAL OUTLAY
720-BUILDING & STRUCTURES: Repair the roof at Well #14 ($25,000), replace the AC Unit at Well #14 ($30,000), replace the fence and gate at 419 Madison Ave (cost shared between Water $7,500 and Collections $7,500), and rehabilitate the building at 419 Madison Ave. and install a safety gate (cost shared between Water $36,000, Collections $36,000, Treatment $36,000 and Engineering $12,000).
735-MASTER PLAN STUDIES: Cost associated with the updating the City's Water Master Plan ($250,000).
737-METERS: Purchase water. meters for new construction service accounts estimated at ($250,000).
738-WELLS: Installation of a no climb fence at the Ward Tank site ($27,600). 739-W ATER MASTER PLAN IMPROVEMENTS: Design and construction of water master plan project (P-36) Mercey Springs - Cardoza to Pioneer Rd ($4,000,000) restricted funds. Design and construction of water master plan project (P-12) Monroe - Sixth ($794,000), design and construction of water master plan (P-13) Center Ln - L St ($217,200), design and construction of water master plan (P-14) Alleyway n/o M St ($181,000), design and construction of water master plan (P-67) 4th St - Pacheco Blvd ($970,000), design of water master plan (P-15) Adams Ave ($91,300) and design of water master plan (P-1 I) H Street ($67,500). Design and construction of Pioneer and Ortigalita Underground Utilities (cost shared between Water $740,000 and Collections $1,480,000 restricted funds). Valve Replacements (valve insertion method) estimated at ($50,000). 750-VF.HICLES: Purchase of a Mid-size SUV (cost shared between Water $30,000 and Collections $30,000), (2) '<. Ton tility Trucks (cost shared between Water $42,S00ea and Collections $42,500ea), 2024 Toyota Prius (cost shared between Water $18,500 and Collections $18,500) with a grant reimbursed of $20,000 from SJV APCD, and ½ Ton Truck $55,000. 753-SPECIALIZED EQUIPMENT: Purchase of a leak detector (cost shared between Water $4,000 and Collections $4,000), utility locator (cost shared between Water $8,000 and Collections $8,000), 20,000 GVWR Trailer ( cost shared between Water $12,500 and Collections $12,500), and SCADA System (cost shared between Water $45,000, Collections $45,000, Treatment $45,000 and Streets $15,000).
755-SPECIALIZED VEHICLES: Purchase of a Hydrant Valve Turning Truck ($200,000). 235
(
95 City of Los Banos
Wastewater Collections
2024-2025
2021-2022 2022-2023 2023-2024 2024-2025
Account Number Description Actual Actual Estimated Adoj?ted 502-432-100-101 Salaries 357,238.09 4041825.18 441,700.73 672,475.19 502-432-100-IOJ Overtime 4,804.85 l 1,688.66 13.538.48 18,903.73 502-432-100-120 Benefits 315,097.35 326,161.84 273,073.68 378,949.12 502-432-100-121 Benefits-PERS 94,882.96 133,019.59 49,096.09 105,024.57 Personnel Services Total: 772,023.25 875,695.27 777,408.98 1,175,352.61 502-432-100-20 I Grounds Maintenance 6,681.02 5,748.41 3,942.76 6,500.00 502-432-100-202 Fleet Repair & Maintenance 16,500.00 18,150.00 22,453.75 27,010.00 502-432-100-203 Equipment Repair & Maintenai 25,345.83 26,554.10 10,854.86 26,250.00 ';j 502-432-100-204 Fleet Services 36,543.00 45,947.00 66,521.75 72,147.00 502-432-100-205 Facility Maintenance 2,829.24 3,152.18 341.61 4,832.86 502-432-100-206 Property Lease 2,946.00 2,946.00 1,764.68 3,222.45 502-432-100-208 Rental - Vehicles & Equipme1 45 l.10 2,000.00 502-432-100-231 Professional Services 110,388.21 93,243.59 481,959.66 150,000.00 502-432-100-236 Medical Services 569.05 444.90 895.45 2,200.00 502-432-100-237 Recruitment 1,365.83 575.37 3,224.63 4,000.00 502-432-100-238 Technical Services 3,719.59 5,284.63 5,028.80 5,500.00 502-432-l 00-240 LT.Services 4,932.00 6,130.00 8,488.15 10,893.85 502-432-100-250 Insurance 23,781.85 32,569.14 48,498.92 46,400.00 502-432-100-251 Memberships & Dues 140.00 381.25 646.85 1,100.00 502-432-100-252 Communications 4,464.39 3,412.04 6,775.23 8,000.00 502-432-100-253 Advertising 376.30 3,000.00
502-432-100-256 Pem1its, Fees & Charges 134,224.02 135.674.00 124,896.62 155,000.00 502-432-100-257 Travel & Training 1,854.71 2,432.66 2,031.60 15,000.00 502-432-100-259 Meetings & Events 2,416.25 428.06 2,600.00 502-432-100-260 Office Supplies 2,033.35 3,078.27 5,218.41 4,800.00 502-432-100-262 Uniform Expense 4,193.98 5,285.82 4,939.94 6,000.00 502-432-100-264 Electricity & Gas 81,531.41 99,276.98 111,507.93 129,000.00 502-432-100-265 Gasoline & Oil 21,504.00 23,940.00 29,394.00 24,045.00 502-432-100-267 General Materials & Supplies 17,902.13 22,903.99 25,593.08 27,500.00 502-432-100-273 Special Departmental Exp. 875.75 2,088.12 1,608.44 2,500.00 Supplies & Scn·ices Total: 504,325.36 541,634.70 967,842.58 739,501.16 502-432-l 00-714 Stom1 Drain Improvement 251 ,834.77 95,767.83 440,000.00 502-432-100-720 Building & Structures 8,826.31 25 ,008.02 43,500.00 502-432-l 00-733 Lift Station Overhaul/Imp 66,842.93 269,256.54 1,907,030.00 502-432-100-735 Master Plan & Rate Study 89,791.43 260,000.00 502-432-100-739 Master Plan Improvements 35,272.60 748,781.36 225,069.57 7,561,000.00 502-432-100-744 Sewer Linc Manholes 18,642.84
5IT2-432-100-750 Vehicles 1,275.09 133 500.00
502-432-100-752 Communication Equipment 271.68 3,514.18 240
96 Wastewater Collections (continued)
735-MASTER PLAN STUDIES: Cost associated with the updating the City's Storm Drain Master Plan and Wastewater Collections Master Plan ($260,000). 739-MASTER PLAN IMPROVEMENTS: Design and constructiori' of Pioneer and Ortigalita Underground Utilities (cost shared between Water $740,000 and Collections $1,480,000 restricted funds). The design and construction of stom1 drain master plan project (CC-7) Jefferson Ave. ($567,000). The design and construction of the main truckline to the WWTP collection master plan projects (WWTP-2A, WWTP-lA, WWTP-1B, and WWTP-lC) 36" casing ($2,514,000), The design and construction ofrecharge/detention NE basin ($3,000,000). 7~0-VEHICLES: Purchase of a Mid-size SUV (cost shared between Water $30,000 and Collections $30,000), (2) ¾ Ton Utility Trucks (cost shared between Water $42,500ea. and 1j Collections $42,SOOea.), and 2024 Toyota Prius (cost shared between Water $18,500 and Collections $18,500) with a grant reimbursed of ($20,000) from SJV APCD. 753-SPECIALIZED EQUIPMENT: Purchase of a leak detector (cost shared between Water $4,000 and Collections $4,000), utility locator (cost shared between Water $8,000 and Collections $8,000), 20,000 GVWR Trailer (cost shared between Water $12,500 and Collections $12,500), rescue/entry equipment for confine spaces ($15,000) and SCAD A System ( cost shared between Water $45,000, Collections $45,000, Treatment $45,000 and Streets $15,000). 770-COMPUTER EQUIPMENT: Expenses related to the implementation of the utility infrastructure system into Cartegraph (cost shared between Water $50,000, Collections $35,000 and Treatment $30,000).
243
97 98
99 ITEM 7I
LOsBanos
r tli Cross1nads o.J Ccdif oniia
Agenda Staff Report
TO: Mayor & City Council Members
FROM: Charles Bergson, P.E., Public Works Director/City Eng· DATE: September 18, 2024
TYPE OF REPORT: Consent Agenda
SUBJECT: Authorizing Award of Bid for the Purchase of a 2024 Model ½ Ton Truck with Lift Gate - Bid No. 25SW0001
Recommendation:

That the City Council adopts the Resolution to award the bid for the purchase of a 2024 Model½ Ton Truck with Lift Gate in the amount of $49,553.62; and authorize a purchase order to be issued to Greenwood Chevrolet in the amount of $49,553.62 for the purchase of a 2024 Model½ Ton Truck with Lift Gate.

Discussion:

In connection with the 2024-2025 Fiscal Year Budget, the City Council approved the City's Capital Plan which included the purchase of a half-ton pickup truck for its fleet. Bid documents for the purchase of a New 2024/2025 Model½ Ton Truck with Lift Gate Bid No. 25SW0001 were released on Wednesday, July 31, 2024. A public notice was advertised on Wednesday, July 31, 2024 in the Westside Express. The bid opening occurred on Thursday, August 22, 2024. The Public Works Department, through the office of City Clerk, received three (3) sealed bids. The following dealerships responded to the City's invitation:

McAuley Ford
Greenwood Chevrolet
Santos Ford
$50,633.16
$49,553.62
$51,242.75
After review of the submitted bid documents, it was determined that Greenwood Chevrolet was able to meet the specifications outlined in the bid package; therefore, making their bid the responsive and responsible bid. Greenwood Chevrolet has this truck included in their inventory and it is available for delivery as soon as the purchase order is issued; 99 therefore, staff is requesting awarding the purchase order to Greenwood Chevrolet for their total bid price in the amount of $49,553.62.

This vehicle will be utilized by the Solid Waste division of Public Works. This truck will replace Unit #407 4, a 2008 Utility Truck with 63,670 miles, but kept as part of the City Fleet. It will be used as a pool truck when staff vehicles are in the shop getting maintenance and repairs done.

Fiscal Impact:

Funds have been allocated in the 2024-2025 Fiscal Year budget for this purchase within the Solid Waste Fund account 510-490-100-750.

Reviewed by:

Jo
Attachments:

Resolution
Public Notice
Bid Opening Sheet
Fiscal Budget Sheet
Truck Sample Picture
Vanessa Portillo, Finance Director
100
RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LOS BANOS AWARDING THE
BID FOR THE PURCHASE OF A NEW 2024
1/2 TON TRUCK WITH LIFT GATE; AND

AUTHORIZE TO ISSUE A PURCHASE ORDER
WHEREAS, the City of Los Banos has the responsibility to procure, manage, and maintain the City's fleet; and
WHEREAS, the City of Los Banos received sealed bids for the purchase of a 2024/2025 Model 1/2 Ton Truck with Lift Gate that were officially opened on Thursday, August22,2024; and
WHEREAS, it was determined that Greenwood Chevrolet provided a responsive and responsible bid of $49,553.62.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby accept the bid of $49,553.62 from Greenwood Chevrolet for the purchase of a 2024 Model ½ Ton Truck with Lift Gate; and authorize to issue the purchase order.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member ___ who moved its adoption, which motion was duly seconded by Council Member _ _ _ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
101
When recorded mail to:

CITY OF LOS BANOS
PUBLIC WORKS DEPT.
411 MADISON AVE.

LOS BANOS, CA 93635

PROOF OF PUBLICATION
(2015.5 C. C. P.)

STATE OF CALIFORNIA,
County of Merced,
I am a citizen of the United States and · a resident of the county aforesaid; I am over the age of
twenty-one years, and not a party to or interested
in the above entitled matter. I am the principal
clerk of THE WESTSIDE EXPRESS, P.O. Box
2422, Los Banos, CA 93635, a newspaper of general
circulation, published in Los Banos, California in the
City of Los Banos, County of Merced, and which
newspaper has been adjudged a newspaper of general
circulation, by the Superior Court of the County of
Merced, State of California. That the notice, of which
the annexed is a printed copy ( set in type not smaller than nonpareil), has been published in each regular
and entire issue of said newspaper and not in any
supplement thereof on the following dates, to-wit:

July 31, 2024
I certify or declare under penalty of perjury that the
foregoing is true and correct.

Dated at Los Banos,
'Fhis July 31st, 2024
Signature
This space is for the County Clerk's Filing Stamp
Proof of Publication of

PUBLIC NOTICE
PUJUCNO'rlCE
INVrTA110N ~ SEALED BIDS
CITY OF LOS BANOS •

PUBLICWOIIKS DEPARTMENT
411 Madison Avenue
Los Banos, CA 93635
(209) Bi7-7056
NanCE IS HEREBY GIVEN that the LOS

BANOS PUBLIC WORKS DEPARTMENT
(herein called the "Owner") invites and will
receive sealed bids up to the hour of 2:00
p.m. Pacific Daylight Savings Time
(PDT) on T]wrsday. August 22. 2024 for
the pure~ of One (1) New 2024/2025
Model 1/2 Ton Pkkup Truck with Lift Gate. ,
At said time, sealed Bid Proposal (herein I
called the"Bld") will be publicly opened and
read aloud In the City of Los Banos Council •
Chambers by the office of the City Clel'k at:

Los Banos City Hall
s20·rStrNt
Los Banos, Callfomll 93635
Questions regarding the Bid Documents
are to be directed to Dan Bronson, Public
Works Fleet Coordinator, by email at dill.
hromoo@>losbanos.orq.

Bids shall be submitted only on fonns
provided in the Bid Packet Bids shall be in
the hands of the City Cleft of the City of Los
Banos, 520 J Street. Los Banos, Califomia,
93635 on or before the hour of 2:00 p.m.

PDT on Thursday, AUgust 22, 2024. No late
Bids will be accepted and will be returned
unopened. No oral, telegraphic, electronic,
facsimUe, or. telephone bid submittals or
modifications wm be considered. Bids
received after the bid submittal deadline
will be rejected and returned to the Bidder
unopened.

The Bid Proposal forms can be obtained
from the City of Los Banos website at ll'lllDL
fmhe09M!'9e
The City of Los Banos reserves the right to
reject any and/or all Bids received.

July31;2024
WEX#24-125
102
LcfsBanos
At the Crossroads of Califor11ia

BID OPENING
BID NO. 25SW0001
Purchase of One (1) New 2024/ 2025 Model½ Ton Pickup Truck with Lift Gate August 22, 2024 - 2:00 p.m.

1. McAuley Ford

2. Greenwood Chevrolet

3. Santos Ford
Signed:

Martha
---d\QMM
Brazil
, ~
Administrative Coordinator
Carlos Granillo
Public Works Operations Manager
$50,633.16
$49,553.62
$51,242.75
Dated: August 22, 2024
103
City of Los Banos
Solid Waste
2024-2025
2021-2022 2022-2023 2023-2024 2024-2025
Account Number Description Actual Actual Estimated Adoeted 510-490-100-750 Vehicles 81,460.46 1,275.09 , 00 00
510-490-100-752 Communication Equipment 271.68
5 I 0-490-100-753 Specialized Equipment 125,000.00
510-490-100-755 Specialized Vehciles 25,000.00
510-490-1 00-770 Computer Equipment 145.92
Capital Outlay Total: 271.68 81,460.46 6,309.97 374,500.00 510-490-100-820 Charge In 399 999.96 412 000.00 245 191.50 441 345.00 Charge Ins - Outs Total: 399,999.96 412,000.00 245,191.50 441,345.00 '1l CalRecycle Grant
510-490-170-102 Part Time 14,321.00 18,510.00 21,406.08 22,000.00 510-490-170-120 Benefits 1,095:57 1,423.13 1,637.63 1,853.00 Personnel Services Total: 15,416.57 19,933.13 23,043.71 23,853.00 510-490-170-253 Advertising 5,895.00
.5 l 0-490-170-267 General Materials & Supplies 12,560.65 39,823.00 Supplies & Sen•ices Total: 5,895.00 12,560.65 39,823.00 5 I0-495-100-900 Contingency 100,000.00
510-495-100-90 I Change in Estimate 46,503.69 91,625.03 Contingency Total: 46,503.69 91,625.03 100,000.00
Total Solid Waste: 4,41Z1J22.02 4,958,708.81 4,781 ,J26.22 U ,541,ZZS.56 257
104
Solid Waste (continued)
726-MISCELLANOUS IMPROVEMENT: Costs associated with F Street Yard Paving (cost shared between Streets $85,000, Parks $85,000, & Solid Waste $85,000) 750-VEHICLr.S: Purchase of a ¾ ton Utility Picku Truck ($65,000), Toyota Prius (cost shared between Streets $18,500 and Solid Waste $18,500) with a grant reimbursement of $20,000 from SNAPCD.
753-SPECIALIZED EQUIPMENT: Purchase of a Flail Mower attachment ($20,000) and a Tractor ($105,000).
755-SPECIALIZED VEHICLE: Purchase of a Kubota UTV ($25,000).

CHARGEIN
820-CHARGE IN: Costs associated with the impact Solid Waste activities have on City streets ($441,345).

CONTINGENCY
900-CONTINGENCY: Unexpected and unforeseen costs associated with Solid Waste activities. 259
105
106
107
ITEM 7J
LOsBanos
At 111 Cross,-oads oj California
Agenda Staff Report
TO: Mayor & City Council Members
FROM: Charles Bergson, P.E., Public Works Director/City DATE: September 18, 2024
TYPE OF REPORT: Consent Agenda
SUBJECT: Authorizing Award of Bid for the Purchase of a 2024 Model SUV - Bid No. 25WA0016
Recommendation:

That the City Council adopts the Resolution to award the bid for the purchase of a 2024 Model SUV in the amount of $42,214.73; and authorize a purchase order to be issued to Greenwood Chevrolet in the amount of $42,214.73 for the purchase of a 2024 Model SUV.

Discussion:

In connection with the 2024-2025 Fiscal Year Budget, the City Council approved the City's Capital Plan which included the purchase of a SUV for its fleet. Bid documents for the purchase of a New 2024/2025 Model SUV Bid No. 25WA0016 were released on Wednesday, August 7, 2024. A public notice was advertised on Wednesday, August 7, 2024 in the Westside Express. The bid opening occurred on Thursday, August 29, 2024.

The Public Works Department, through the office of City Clerk, received three (3) sealed bids. The following dealerships responded to the City's invitation:

Greenwood Chevrolet
Santos Ford
McAuley Ford
$42,214.73
$36,966.41
$38,788.83
After review of the submitted bid documents, it was determined that Greenwood Chevrolet was able to meet the specifications outlined in the bid package; therefore, making their bid the responsive and responsible bid. Greenwood Chevrolet has this truck included in their inventory and is available for delivery as soon as the purchase order is issued; 107
therefore, staff is requesting awarding the purchase order to Greenwood Chevrolet for their total bid price in the amount of $42,214.73.

This vehicle is an acquisition and will be utilized by the Administration of Public Works. It will be used to check on projects, inspect job sites, attend meetings and conferences, and city events.

Fiscal Impact:

Funds have been allocated in the 2024-2025 Fiscal Year budget for this purchase within the Water Fund account 501-461-100-750 and Wastewater Fund account 502-432-100- 750.

Attachments:

Resolution
Public Notice
Bid Opening Sheet
Fiscal Budget Sheet
SUV Sample Picture
Vanessa Portillo, Finance Director
108
RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LOS BANOS AWARDING THE
BID FOR THE PURCHASE OF A NEW 2024
MODEL SUV; AND AUTHORIZE TO ISSUE A

PURCHASE ORDER
WHEREAS, the City of Los Banos has the responsibility to procure, manage, and maintain the City's fleet; and
WHEREAS, the City of Los Banos received sealed bids for the purchase of a New 2024/2025 Model SUV that were officially opened on Thursday, August 29, 2024; and
WHEREAS, it was determined that Greenwood Chevrolet provided a responsive and responsible bid of $42,214.73.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby accept the bid of $42,214.73 from Greenwood Chevrolet for the purchase of a New 2024 Model SUV; and authorize to issue the purchase order.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member ___ who moved its adoption, which motion was duly seconded by Council Member ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
109
- .. . -
When recorded mail to:

CITY OF LOS BANOS

PUBLIC WORKS DEPARTMENT
411 MAD1SON A VENUE
LOS BANOS, CA 93635

PROOF OF PUBLICATION
(2015.5 C. C. P.)

ST ATE OF CALIFORNIA,
County of Merced,
I am a citizen of the United States and a resident of
the county aforesai9; I am over the age of
twenty-one years, and not a party to or interested
in the above entitled matter. I am the principal
clerk of THE WESTSIDE EXPRESS, P.O. Box
2422, Los Banos, CA 93635, a newspaper of general
circulation, published in Los Banos, California in the
City of Los Banos, County of Merced, and which
newspaper has been adjudged a newspaper of general
circulation, by the Superior Court of the County of
Merced, State of California. That the notice, of which
the annexed is a printed copy (set in type not smaller
than nonpareil), has been published in each regular
and entire issue of said newspaper and not in any
supplement thereof on the following dates, to-wit:

Aug 7, 2024
J
I certify or declare under penalty of perjury that the
foregoing is true and correct.

Dated at Los Banos,
This August 7, 2024
~~ Co,Jro;J
Signature
This space is for the County Clerk's Filing St-imp
Proof of Publication of

PUBLIC NOTICE
110
LOs Banos
At the Cmssmads of California

BID OPENING
25\tffoo \ \JI
PURCHASE OF ONE (1) NEW 2024/2025 MODEL SUV
August 29, 2024 - 2:00 P.M.
1 . Greenwood Chevrolet

2. Santos Ford

3. McAuley Ford
Signed,C 2.u°'=~'
Sara Blevins
Assistant City Clerk/HR Analyst
~d.J!_
Carlos Granillo
Public Works Operations Manager
$42,214.73
$ 36,966.41
$38,788.83
Date: August 29, 2024
111
Account Number
501-461-100-739
501 -461-100-750
501-461-100-752
501-461-100-753
50]-461-100-755
501-461-100-770
501-495-100-900
City of Los Banos
Water
2024-2025
2021-2022
Description Actual
Master Plan Improvements 74,687.72
Vd11dc,, 49.56
Communication Equipment 271.68
Specialized Equipment
Specialized Vehicles 62,958.54
Computer Equipment
Capital Outlay Total: 270,127.87
Contingency
Contingency Total:

Total Water: 3,592,338.16
233
(
2022-2023 2023-2024 2024-2025
Actual Estimated Adopted
1,533,144.02 89,616.83 7,111,000.00
80,028.18 68,272.22 188,.500.00

3.514.18
8,191.55 113,151.47 69,500.00
65,213.84 200,000.00
4,822.80 50,000.00
1,882,329.84 664,236.54 8,245,100.00
100,000.00
100,000.00
5,444,!!18.27 4,718,081.0J 13,951,8:ZZ,0l
112
Water (continued)
267-GENERAL MATERIALS & SUPPLIES: Materials and supplies utilized by Operations personnel for the general water distribution materials and supplies including pipes, valves, fittings, service Jines, meters, meter boxes, etc. Water production materials and supplies including chemicals (fluoride and chlorine), field water quality analysis supplies, materials used at the City laboratory for water quality analysis, and repair parts for pumps and electric motors for the wells & chemical feed equipment. Asphalt repair following repair of underground distribution facilities. 273-SPECIAL DEPARTMENTAL EXPENSES: For miscellaneous safety equipment and employee longevity awards.

CAPITAL OUTLAY
720-BUILDING & STRUCTURES: Repair the roof at Well #14 ($25,000), replace the AC Unit at Well #14 ($30,000), replace the fence and gate at 419 Madison Ave (cost shared between Water $7,500 and Collections $7,500), and rehabilitate the building at 419 Madison Ave. and install a safety gate (cost shared between Water $36,000, Collections $36,000, Treatment $36,000 and Engineering $12,000).
735-MASTER PLAN STUDIES: Cost associated with the updating the City's Water Master Plan ($250,000).
737-METERS: Purchase water meters for new construction service accounts estimated at ($250,000).
738-WELLS: Installation of a no climb fence at the Ward Tank site ($27,600). 739-WATER MASTER PLAN IMPROVEMENTS: Design and construction of water master plan project (P-36) Mercey Springs - Cardoza to Pioneer Rd ($4,000,000) restricted funds. Design and construction of water master plan project (P-12) Monroe - Sixth ($794,000), design and construction of water master plan (P-13) Center Ln - L St ($217,200), design and construction of water master plan (P-14) Alleyway n/o M St ($181,000), design and construction of water master plan (P-67) 4th St - Pacheco Blvd ($970,000), design of water master plan (P-15) Adams Ave ($91,300) and design of water master plan (P-11) H Street ($67,500). Design and construction of Pioneer and Ortigalita Underground Utilities (cost shared between Water $740,000 and Collections $1,480,000 restricted funds). Valve Replacements (valve insertion method) estimated at ($50,000). 750-VEHICLES: Purchase of a Mi -size SUV (cost shared between Water $30,000 and Collections $30,000), (2) ¼ Ton Utility Trucks (cost shared between Water $42,S00ea and Collections $42,500ea), 2024 Toyota Prius (cost shared between Water $18,500 and Collections $18,500) with a grant reimbursed of $20,000 from SJV APCD, and ½ Ton Truck $55,000. 753-SPECIALIZED EQUIPMENT: Purchase of a leak detector (cost shared between Water $4,000 and Collections $4,000), utility locator (cost shared between Water $8,000 and Collections $8,000), 20,000 GVWR Trailer ( cost shared between Water $12,500 and Collections $12,500), and SCADA System (cost shared between Water $45,000, Collections $45,000, Treatment $45,000 and Streets $15,000).
755-SPECIALIZED VEHICLES: Purchase of a Hydrant Valve Turning Truck ($200,000). 235
(
(
113
City of Los Banos
Wastewater Collections
( 2024-2025
202)-2022 2022-2023 2023-2024 2024-2025
Account Number Description Actual Actual Estimated Adoeted 502-432-100-101 Salaries 357,238.09 404,825.18 441,700.73 672,475.19 502-432-100-103 Overtime 4,804.85 11,688.66 13,538.48 18,903.73 502-432-100-120 Benefits 315,097.35 326,161.84 273,073.68 378,949.12 502-432-100-121 Benefits-PERS 94,882.96 133,019.59 49,096.09 105,024.57 Personnel Services Total: 772,023.25 875,695.27 777,408.98 1, I 75,352.61 502-432-100-201 Grounds Maintenance 6,681.02 5,748.41 3,942.76 6,500.00 502-432-100-202 Fleet Repair & Maintenance 16,500.00 18,150.00 22,453.75 27,010.00 502-432-100-203 Equipment Repair & Maintena, 25,345.83 26,554.10 10,854.86 26,250.00 502-432-100-204 Fleet Services 36,543 .00 45,947.00 66,521.75 72,147.00 502-432-100-205 Facility Maintenance 2,829.24 3,152.18 341.61 4,832.86 502-432-100-206 Property Lease 2,946.00 2,946.00 1,764.68 3,222.45 502-432-100-208 Rental - Vehicles & Equipme1 451.10 2,000.00 502-432-100-231 Professional Services 110,388.21 93,243.59 481,959.66 150,000.00 502-432-100-236 Medical Services 569.05 444.90 895.45 2,200.00 502-432-100-237 Recruitment 1,365.83 575.37 3,224.63 4,000.00 502-432-100-238 Technical Services 3,719.59 5,284.63 5,028.80 5,500.00 502-432-100-240 LT.Services 4,932.00 6,130.00 8,488.15 10,893.85 502-432-100-250 Insurance 23,781.85 32,569.14 48,498.92 46,400.00 502-432-100-251 Memberships & Dues 140.00 381.25 646.85 1,100.00 502-432-l 00-252 Communications 4,464.39 3,412.04 6,775.23 8,000.00 502-432-l 00-253 Advertising 376.30 3,000.00
502-432-100-256 Pennits, Fees & Charges 134,224.02 135,674.00 124,896.62 155,000.00 502-432-100-257 Travel & Training 1,854.71 2,432.66 2,031.60 15,000.00 502-432-100-259 Meetings & Events 2,416.25 428.06 2,600.00 502-432-100-260 Office Supplies 2,033.35 3,078.27 5,218.41 4,800.00 502-432-100-262 Uniform Expense 4,193.98 5,285.82 4,939.94 6,000.00 502-432-100-264 Electricity & Gas 81,531.41 99,276.98 111 ,507.93 129,000.00 502-432-100-265 Gasoline & Oil 21,504.00 23,940.00 29,394.00 24,045.00 502-432-100-267 General Materials & Supplies 17,902.13 22,903.99 25,593.08 27,500.00 502-432-100-273 Special Departmental Exp. 875. 75 2,088.12 I 608.44 2.500.00 Supplies & Scr\"ices Total: 504,325.36 541,634.70 967,842.58 739,501.16 502-432-100-714 Stom1 Drain Improvement 251,834.77 95,767.83 440,000.00 502-432-l 00-720 Building & Structures 8,826.31 25,008.02 43,500.00 502-432-100-733 Lift Station Overhaul/Imp 66,842.93 269,256.54 1,907,030.00 502-432-100-735 Master Plan & Rate Study 89,791.43 260,000.00 502-432-100-739 Master Plan Improvements 35,272.60 748,781.36 225,069.57 7,561,000.00 502-432-100-744 Sewer Linc Manholes 18,642.84
502-432- 100-750 Vehicles 1,275.09 I 33,50Q_OO
502-432-100-752 Communication Equipment 271.68 3,514.18 240
114
Wastewater Collections (continued)
735-MASTER PLAN STUDIES: Cost associated with the updating the City's Storm Drain Master Plan and Wastewater Collections Master Plan ($260,000). 739-MASTER PLAN IMPROVEMENTS: Design and construction of Pioneer and Ortigalita Underground Utilities (cost shared between Water $740,000 and Collections $1,480,000 restricted funds). The design and construction of stom1 drain master plan project (CC-7) Jefferson Ave. ($567,000). The design and construction of the main truckline to the WWTP collection master plan projects (WWTP-2A, WWTP-lA, WWTP-1B, and WWTP-lC) 36" casing ($2,514,000). The design and construction ofrecharge/detention NE basin ($3,000,000). 750-VEHICL~S: urchase of a Mid-size STN (cost shared between Water $30,000 and Collections $30,000), (2) ¾ Ton Utility Trucks (cost shared between Water $42,5OOea. and Collections $42,5OOea.), and 2024 Toyota Prius (cost shared between Water $18,500 and Collections $18,500) with a grant reimbursed of ($20,000) from SN APCD. 753-SPECIALIZED EQUIPMENT: Purchase of a leak detector (cost shared between Water $4,000 and Collections $4,000), utility locator (cost shared between Water $8,000 and Collections $8,000), 20,000 GVWR Trailer (cost shared between Water $12,500 and Collections $12,500), rescue/entry equipment for confine spaces ($15,000) and SCADA System (cost shared between Water $45,000, Co1lections $45,000, Treatment $45,000 and Streets $15,000). 770-COMPUTER EQUIPMENT: Expenses related to the implementation of the utility infrastructure system into Cartegraph (cost shared between Water $50,000, Collections $35,000 and Treatment $30,000).
243
r
(
115
116
ITEM 7K
117
LOsBanos
t J Crossroads of California
Agenda Staff Report
TO: Mayor & City Council Members
FROM: Charles Bergson, P.E., Public Works Director/City E DATE: September 18, 2024
TYPE OF REPORT: Consent Agenda
SUBJECT: Authorizing Award of Bid for the Purchase of a 2023 Medium Duty Flatbed Truck- Bid No. 25WA0014
Recommendation:

That the City Council adopts the Resolution to award the bid for the purchase of a 2023 Medium Duty Flatbed Truck in the amount of $80,247.08; and authorize a purchase order to be issued to Greenwood Chevrolet in the amount of $80,247.08 for the purchase of a 2023 Medium Duty Flatbed Truck.

Discussion:

In connection with the 2024-2025 Fiscal Year Budget, the City Council approved the City's Capital Plan which included the purchase of a Medium Duty Utility Flatbed Truck to be used as a Hydrant Valve Turning Truck for its fleet. Bid documents for the purchase of a New 2023/2024 Model Medium Duty Flatbed Truck Bid No. 25WA0014 were released on Wednesday, July 31, 2024. A public notice was advertised on Wednesday, July 31, 2024 in the Westside Express. The bid opening occurred on Thursday, August 22, 2024. The Public Works Department, through the office of City Clerk, received four (4) sealed bids.

The following dealerships responded to the City's invitation:

Santos Ford
Greenwood Chevrolet
McAuley Ford
Silveira Chevrolet
$88,533.76
$80,247.08
$66,423.08
$87,016.52
After review of the submitted bid documents, it was determined that Greenwood Chevrolet was able to meet the specifications outlined in the bid package; therefore, making their bid the responsive and responsible bid. Greenwood Chevrolet has this truck in their 117
inventory and is available for delivery as soon as the purchase order is issued; therefore, staff is requesting awarding the purchase order to Greenwood Chevrolet for their total bid price in the amount of $80,247.08.

This vehicle will be utilized by the Water division of Public Works. This truck acquisition will be used to exercise hydrant and water valves throughout the City. The hydrant valve turning system can also assist in detecting broken valves or valves that are on the verge of breaking.

Fiscal Impact:

Funds have been allocated in the 2024-2025 Fiscal Year budget for this purchase within the Water Fund account 501-461-100-755.

Reviewed by:

Jos
Attachments:

Resolution
Public Notice
Bid Opening Sheet
Fiscal Budget Sheet
Truck Sample Picture
Vanessa Portillo, Finance Director
118
RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LOS BANOS AWARDING THE
BID FOR THE PURCHASE OF A NEW 2023
MEDIUM DUTY FLATBED TRUCK; AND

AUTHORIZE TO ISSUE A PURCHASE ORDER
WHEREAS, the City of Los Banos has the responsibility to procure, manage, and maintain the City's fleet; and
WHEREAS, the City of Los Banos received sealed bids for the purchase of a 2023/2024 Model Medium Duty Flatbed Truck that were officially opened on Thursday, August22,2024;and
WHEREAS, it was determined that Greenwood Chevrolet provided a responsive and responsible bid of $80,247.08.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby accept the bid of $80,247.08 from Greenwood Chevrolet for the purchase of a 2023 Medium Duty Flatbed Truck; and authorize to issue the purchase order.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member _ _ _ who moved its adoption, which motion was duly seconded by Council Member ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
119
When recorded mail to:

CITY OF. LOS BANOS

PUBLIC WORKS DEPARTMENT
411 MADISON A VENUE
LOS BANOS, CA 93635

PROOF OF PUBLICATION
(2015.5 C. C. P.)

STATE OF CALIFORNIA,
County of Merced,
I am a citizen of the United States and a resident of
the county aforesaid; I am over the age of
twenty-one years, and not a party to or interested
in the above entitled matter. I am the principal
clerk of THE WESTSIDE EXPRESS, P.O. Box
2422, Los Banos, CA 93635, a newspaper of general
circulation, published in Los Banos; California in the
City of Los Banos, County of Merced, and which
newspaper has been adjudged a newspap~r of general
circulation, by the Superior Court of the County of
Merced, State of California. That the notice, of which
the annexed is a printed copy (set in type not smaller
than nonpareil), has been published in each regular
and entire issue of said newspaper and not in any
supplement thereof on the following dates, to-wit:

July 31, 2024
I certify or declare under penalty of perjury that the
foregoing is true and correct.

Dated at Los Banos,
This July 31, 2024 j
This space is for the County Clerk's Filing Stamp
Proof of Publication of

PUBLIC NOTICE

PUBLIC NOTICE

INVITATION FOR SEALED BIDS

CITY OF LOS BANOS

PUBLIC WORKS DEPARTMENT
411 Madison Avenue
Los Banos. CA 93635
(209) 827-7056
, NOTICE IS HEREBY GIVEN that the LOS

BANOS PUBLIC WORKS DEPARTMENT
(herein c.alled the "Owner") im.ites and will
receive sealed bids up to the hour of 2:00
p.m. Pacific Daylight Savings Time
(PDT) on Thursday, August 22, 2024 for the
purchase of One (1) New 2023/2024 Model
Medium Duty Flatbed Truck. At said time,
sealed Bid Proposal (herein called the ·Bid")
"will be publicly opened and read aloud In
the City of Los Banos Council Chambers by
the office of the Crty Clerk at
Los Banos City Hall
520urstreet
Los B-. Callfomla !13635
Questions regarding the Bid Documents
are to be directed to Dan Bronson, Public
Worf<s Fleet Coordinator, by email at din.
broMop@losbanos
Bids shall be submitted only on forms
provided in the Bid Packet Bids shall be in
the hands of the City Clerk of the City of Los
Banos, 520 J Street. Los Banos, (allfomla,
9363S on or before the hour of 2:00 pm.

POT on JIMldly. August 22. 2024. No late
Bids will be accepted and will be returned
unopened. No oral, telegraphic, electronic.
facslmlle, or telephone bid submlttals or
modifications wlU be considered. Bids
rea!lved after the bid submittal deadllne
will be rejected and returned to the Bidder
, unopened.

The Bld Pro~I forms can be obtained :
from the City of Los Banos website at ll1tllDL . IRtbN)os,clra, • The City of Los Banos reserves the right to ,
reject any and/or all Bids received.

July 31, 2024
WEX#24-127
120
LOsBanos
At the Crossroads of California

BID OPENING
BID NO. 25WT0014
Purchase of One (1) New 2023/2024 Model Medium Dutv Flatbed Truck August 22, 2024 - 2:00 p.m.

1. Santos Ford

2. Greenwood Chevrolet

3. McAuley Ford

4. Silveira Chevrolet
Signed: ~Arl\11<' ~Q. Martha Brazil
Administrative Coordinator
Carlos Granillo
Public Works Operations Manager
$88,533.76
$80,247.08
$83,818.49
$87,016.52
Dated: August 22, 2024
121
Account Number
501-461-100-739
501-461-100-750
501-461-100-752
501-461-100-753
501-461 -100-755
501-461-100-770
501-495-100-900
City of Los Banos
Water
2024-2025
2021-2022
Description Actual
Master Plan Improvements 74,687.72
Vehicles 49.56
Communication Equipment 271.68
Specialized Equipment
Specialized Vehicles 62,958.54
Computer Equipment _
Capital Outlay Total: 270,127.87
Contingency
Contingency Total:

Total Water: 3,592,JJ~.16
233
2022-2023 2023-2024 2024-2025
Actual Estimated Adopted
1,533,144.02 89,616.83 7,111,000.00
80,028.18 68,272.22 188,500.00
3,514.18
8,191.55 113,151.47 69,500.00
65 ,213.84 2UU,UUU.UU
4 822.80 50,000.00
1,882,329.84 664,236.54 8,245,100.00
100 000.00 il
100,000.00
5,444,818.27 4,718,081.03 13,951,877.01
122
Water (continued)
267-GENERAL MATERIALS & SUPPLIES: Materials and supplies utilized by Operations personnel for the general water distribution materials and supplies including pipes, valves, fittings, service lines, meters, meter boxes, etc. Water production . materials and supplies including chemicals (fluoride and chlorine), field water quality analysis supplies, 'materials used at the City laboratory for water quality analysis, and repair parts for pumps and electric motors for the wells & chemical feed equipment. Asphalt repair following repair ofunderground distribution facilities. 273-SPECIAL DEPARTMENTAL EXPENSES: For miscellaneous safety equipment and employee longevity awards.

CAPITAL OUTLAY
720-BUILDING & STRUCTURES: Repair the roof at Well #14 ($25,000), replace the AC Unit at Well #14 ($30,000), replace the fence and gate at 419 Madison Ave (cost shared between Water $7,500 and Collections $7,500), and rehabilitate the building at 419 Madison Ave. and install a safety gate (cost shared between Water $36,000, Collections $36,000, Treatment $36,000 and Engineering $12,000).
735-MASTER PLAN STUDIES: Cost associated with the updating the City's Water Master Plan ($250,000).
737-METERS: Purchase water. meters for new construction service accounts estimated at ($250,000).
738-WELLS: Installation of a no climb fence at the Ward Tank site ($27,600). 739-WATER MASTER PLAN IMPROVEMENTS: Design and construction of water master plan project (P-36) Mercey Springs - Cardoza to Pioneer Rd ($4,000,000) restricted funds. Design and construction of water master plan project (P-12) Monroe - Sixth ($794,000), design and construction of water master plan (P-13) Center Ln - L St ($217,200), design and construction of water master plan (P-14) Alleyway n/o M St ($181,000), design and construction of water master plan (P-67) 4th St - Pacheco Blvd ($970,000), design of water master plan (P-15) Adams Ave ($91,300) and design of water master plan (P-11) H Street ($67,500). Design and construction of Pioneer and Ortigalita Underground Utilities (cost shared between Water $740,000 and Collections $1,480,000 restricted funds). Valve Replacements (valve insertion method) estimated at ($50,000). 750-VEHICLES: Purchase of a Mid-size SUV (cost shared between Water $30,000 and Collections $30,000), (2) ¾ Ton Utility Trucks (cost shared between Water $42,500ea and Collections $42,500ea), 2024 Toyota Prius (cost shared between Water $18,500 and Collections $18,500) with a grant reimbursed of $20,000 from SJV APCD, and ½ Ton Truck $55,000. 753-SPECIALIZED EQUIPMENT: Purchase of a leak detector ( cost shared between Water $4,000 and Collections $4,000), utility locator (cost shared between Water $8,000 and Collections $8,000), 20,000 GVWR Trailer (cost shared between Water $12,500 and Collections $12,500), and SCADA System (cost shared between Water $45,000, Collections $45,000, Treatment $45,000 and Streets $15,000).
755-SPECIALIZED VEHICLES: Purchase o a Hydrant Valve Turning Truck ($200,000) 235
123
124
ITEM 7L
125
LOsBanos
l ti, Crvssroads of California
Agenda Staff Report
TO: Mayor & City Council Members
FROM: Charles Bergson, P.E. , Public Works Director/City E DATE: September 18, 2024
TYPE OF REPORT: Consent Agenda
SUBJECT: Authorizing Award of Bid for the Purchase of Two (2) New 2024 ¾ Ton Medium Duty 4x4 Utility Trucks with Lift Gates - Bid No. 25WT0004 Recommendation:

That the City Council adopts the Resolution to award the bid for the purchase of Two (2) New 2024 ¾ Ton Medium Duty 4x4 Utility Trucks with Lift Gates in the amount of $154,848.82; and authorize a purchase order to be issued to Greenwood Chevrolet in the amount of $154,848.82 for the purchase of Two (2) New 2024 ¾ Ton Medium Duty 4x4 Utility Trucks with Lift Gates.

Discussion:

In connection with the 2024-2025 Fiscal Year Budget, the City Council approved the City's Capital Plan which included the purchase of Two (2) ¾ Ton Medium Duty 4x4 Utility Trucks with Lift Gates for its fleet. Bid documents for the purchase of Two (2) New 2024/2025 ¾ Ton Medium Duty 4x4 Utility Trucks with Lift Gates Bid No. 25WT0004 were released on Wednesday, August 7, 2024. A public notice was advertised on Wednesday, August 7, 2024 in the Westside Express. The bid opening occurred on Thursday, August 29, 2024. The Public Works Department, through the office of City Clerk, received three (3) sealed bids. The following dealerships responded to the City's invitation:

Greenwood Chevrolet
Santos Ford
McAuley Ford
$154,848.82
$149,379.26
$149,569.10
125
After review of the submitted bid documents, it was determined that Greenwood Chevrolet was able to meet the specifications outlined in the bid package; therefore, making their bid the responsive and responsible bid. Greenwood Chevrolet has these trucks included in their inventory and are available for delivery as soon as the purchase order is issued; therefore, staff is requesting awarding the purchase order to Greenwood Chevrolet for their total bid price in the amount of $154,848.82.

These trucks will be utilized by the Wastewater division of Public Works. The 4x4 trucks will provide the ability to be used for off-road driving, which will allow access to areas of the Wastewater Treatment Plant that was only previously accessed with a tractor or backhoe.

Fiscal Impact:

Funds have been allocated in the 2024-2025 Fiscal Year budget for this purchase within the Wastewater Fund account 502-433-100-750.

Attachments:

Resolution
Public Notice
Bid Opening Sheet
Fiscal Budget Sheet
Truck Sample Picture
Vanessa Portillo, Finance Director
126
RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LOS BANOS AWARDING THE
BID FOR THE PURCHASE OF A TWO (2)
NEW 2024 ¾ TON MEDIUM DUTY 4X4
UTILITY TRUCKS WITH LIFT GATES; AND
AUTHORIZE TO ISSUE A·PURCHASE ORDER
WHEREAS, the City of Los Banos has the responsibility to procure, manage, and maintain the City's fleet; and
WHEREAS, the City of Los Banos received sealed bids for the purchase of Two (2) 2024/2025 Model ¾ Ton Medium Duty 4x4 Utility Trucks with Lift Gates that were officially opened on Thursday, August 29, 2024; and
WHEREAS, it was determined that Greenwood Chevrolet provided a responsive and responsible bid of $154,848.82.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby accept the bid of $154,848.82 from Greenwood Chevrolet for the purchase of Two (2) New 2024 Model ¾ Ton Medium Duty 4x4 Utility Trucks with Lift Gates; and authorize to issue the purchase order.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member _ __ who moved its adoption, which motion was duly seconded by Council Member ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
127
When recorded mail to:

CITY OF LOS BANOS

PUBLIC WORKS DEPARTMENT
411 MADISON A VENUE
LOS BANOS, CA 93635

PROOF OF PUBLICATION
(2015.5 C. C. P.)

STATE OF CALIFORNIA,
County of Merced,
I am a citizen of the United States and a resident of
the county aforesaid; I am over the ~ge of
twenty-one years, and not a party to or interested
in the above entitled matter. I am the principal
clerk of THE WESTSIDE EXPRESS, P.O. Box
2422, Los Banos, CA 93635, a newspaper of general
circulation, published in Los Banos, California in the
City of Los Banos, County of Merced, and which
newspaper has been adjudged a newspaper of general
circulation, by the Superior Court of the County of
Merced, State of California. That the notice, of which
the annexed is a printed copy (set in type not smaller
than nonpareil), has been published in each regular
and entire issue of said newspaper and not in any
supplement thereof on the following dates, to-wit:

Aug 7, 2024
)
I certify or declare under penalty of perjury that the
foregoing is true and correct.

Dated at Los Banos,
This August 7, 2024
Signature
This space is for the County Clerk's Filing stamp
Proof of Publication of

PUBLIC NOTICE
lfMIJfflONfOII IUUD I
OJV8F~ M9:I$
fltJII.ICWORl<toePARTMENr
J~AW!t~
~ c,.,cgg
°"'1171· ~ ~CiMNOWtlbeU)S
MNCK MIC ~ ~
wit
~
128
LOs Banos
At the Crossroads of California
BID OPENING +
,i5WW000
PURCHASE OF TWO NEW 2024/2025 ¾ TON MEDIUM DUTY
4X4 UTILITY TRUCKS WITH LIFT GATE
August 29, 2024 - 2:00 P.M.

1. Greenwood Chevrolet

2. Santos Ford

3. McAuley Ford
Signed: \.~ .!
Sara Blevins
Assistant City Clerk/HR Analyst
Carlos Granillo
Public Works Operations Manager
$ 154,848.82
($77,424.41 per unit)
$ 149,379.26
$ 149,569.10
Date: August 29, 2024
129
City of Los Banos
Wastewater Treatment
2024-2025
(
2021-2022 2022-2023 2023-2024 2024-2025
Account Number Description Actual Actual Eestimated Adoeted 502-433-100-101 Salaries 255,035.61 261,584.84 329,495.46 453,384.66 502-433-100-102 Part Time 1,404.08
502-433-100-103 Overtime 7,100.15 4,838.67 4,975.67 11,001.86 502-433-100-120 Benefits 185,567.12 167,198.95 177,656.91 223,743.3 I 502-433-100-121 Benefits-PERS 101,278.45 102,014.24 38,404.16 78,956.56 Personnel Services Total: 548,981.33 535,636.70 551,936.28 767,086.39 502-433-100-201 Grounds Maintenance 9,851.76 7,872.65 6,662.19 9,200.00 502-433-100-202 Fleet Repair & Maintenance 9,330.00 10,263.00 12,697.15 11,285.00 502-433-100-203 Equipment Repair & Maintena, 25,891.70 26,956.15 25,934.51 35,000.00 502-433-100-204 Fleet Services 20,057.00 25,219.00 36,5JJ .35 39,599.00 502-433-100-205 Facility Maintenance 5,510.85 8,764.94 7,764.28 I 1,985.49 502-433-1 00-206 Property Lease 427,857.00 427,857.00 256,350.53 468,118.35 502-433-100-208 Rental - Vehicles & Equipme1 326.43 198.00 I 03.50 500.00 502-433-100-231 Professional Services 95,824.59 186,992.51 3,849,912.67 360,000.00 502-433-100-236 Medical Services 151.44 424.82 2,256.52 2,000.00 502-433-100-237 Recruitment 137.91 69.87 3,610.40 4,000.00 502-433-100-238 Technical Services 97,636.48 78,780.18 49,037.54 105,000.00 502-433-100-240 I.T. Services 4,618.00 5,627.00 8,107.50 10,404.55 502-433-100-250 Insurance 30,040.55 36,682.76 54,667.09 52,300.00 ( 502-433-100-251 Memberships & Dues 2,596.50 189.00 799.81 6,150.00 502-433-100-252 Communications 2,654.83 3,190.45 4,223 .19 5,775.00 502-433-100-256 Pem1its. Fees & Charges 28,889.71 37,698.56 41,256.35 38,000.00 502-433-100-257 Travel & Training 1,275.03 1,461.97 1,842.66 20,000.00 502-433-100-259 Meetings & Events 358.74 1,600.00
502-433-100-260 Office Supplies 1,968.79 3,306.47 2,594.48 2,625.00 502-433-100-262 Uniform Expense 3,330.38 2,330.86 2,453.77 3,300.00 502-433-100-264 Electricity & Gas 152,369.70 154,067.41 138,764.92 162,000.00 502-433-100-265 Gasoline & Oil 18,254.00 22,995.00 28,152.00 23,100.00 502-433-100-267 General Materials & Supplies 20,322.20 24,426.59 28,461.47 25,500.00 502-433-100-273 Special Departmental Exp. 33,394.50 32,984.36 40,699.66 41,000.00 502-433-100-275 Bad Debt Expense 7,648.14
Supplies & Services Total: 992,289.35 I ,098,358.55 4,6 I 0,870.42 1,438,442.39 502-433-100-7 l 6 Street & Road Improvements 42,756.77 34,538.94 502-433-100-717 Landscape & Irrigation 1,035,325.20
502-433-)00-720 Building & Structures 29,739.17 876,000.00 502-433-100-726 Misc Improvements 350,000.00
502-433-)00-739 Master Plan Improvements 500,000.00
502-433-100-740 Miscellaneous Equipment 51,195.60
502-433- 00-•.1so Vch1dc, 79,918.19 -90. 00.00
245
130
(
Wastewater Treatment (continued)
726-MISCELLANEOUS IMPROVMENTS: Costs associated with the assessment of the levees at the Wastewater Treatment Plant ($350,000).
739-MASTER PLAN IMPROVEMENTS: Construct potable water line from the City's water infrastructure, near Saint Frances subdivision, to the Wastewater Treatment Plant, estimated cost ($500,000).
750-VEHICLES: Purchase of (2) ¾ Ton Utility Truck four wtieel drive estimated ($190,000). 753-SPECIALIZED EQUIPMENT: Purchase a welding machine ($6,000), and SCADA System (cost shared between Water $45,000, Collections $45,000, Treatment $45,000 and Streets $15,000).
770-COMPUTER EQUIPMENT: Expenses related to the implementation of the utility infrastructure system into Cartegraph (cost shared between Water $50,000, Collections $35,000 and Treatment $30,000).

CONTINGENCY
900-CONTINGENCY: Unexpected and unforeseen costs associated with Wastewater activities. 248
131
132
133
ITEM 7M
LOs Banos
\ kl 1/ ,/1/ II
Agenda Staff Report
TO: Mayor and City Council Members
FROM:

DATE:

Darren Cole, Police Officer In Charge ~
September 18, 2024
SUBJECT: Police Department awarded $48,050.00 California Department of Alcoholic Beverage Control (A.B.C.) Alcohol Policing Partnership (APP) Grant
TYPE OF REPORT: Consent Agenda
Recommendation:

Approve the acceptance of the California A.B.C. APP grant (agreement number 24- APP23) in the amount of $48,050.00 for FY 2024/2025 and approve an increase in City expenditures and revenues in the amount of $48,050.00 for the FY 2024/2025.

Discussion:

The Police Department has applied for and been awarded an ABC APP grant in the amount of $48,050.00. This funding will be devoted to specific goals and objectives related to alcohol offenses, including:
• Train staff members in new procedures and tactics related to better educating, monitoring and enforcing violations of A.B.C. licensees. • Work with local licensees to better educate them about A.B.C. related laws and regulations.
• Better collect and analyze crime, accident and other data that relates to A.B.C. establishments and share that data with staff, licensees and others. • Through a variety of enforcement tactics, better enforce violations of A.B.C. law related to licensees and alcohol related offenses, specifically the sales to minors. 133
Fiscal Impact:

Revenues and expenditures for the FY 2024/2025 will increase in the amount of $48,050.00. The grant cycle ends on June 30, 2025.

Revenues: State Grant: 100-000-334-010
Expenditures: Overtime: 100-421-190-103
Benefits 100-421-190-120
Travel/Training: 100-421-190-257
Special Departmental
Exp.: 100-421-190-73
Reviewed by:

Vanessa Portillo, Finance Director
Attachments:

Resolution
$48,050.00
$39,526.00
$ 3,024.00
$ 3,000.00
$ 2,500.00
134
RESOLUTION NO. --

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF LOS BANOS APPROVING THE
ACCEPTANCE OF A $48,050.00 GRANT

AWARDED BY THE CALIFORNIA DEPARTMENT

OF ALCOHOLIC BEVERAGE CONTROL

RELATED TO THE ENFORCEMENT OF

ALCOHOL RELATED CRIMES AND AMENDING
THE FISCAL YEAR 2024-2025 BUDGET BY

INCREASING THE APPROPRIATION AMOUNT

FOR EXPENDITURES AND REVENUES IN THE
AMOUNT OF $48,050.00
WHEREAS, Alcohol related crime in the City of Los Banos has been responsible for numerous incidents causing injury, death and monetary loss; and WHEREAS, through enforcement efforts the Los Banos Police Department can reduce the number of alcohol related incidents which cause death or serious injuries; and
WHEREAS, the Los Banos Police Department has applied for and been awarded a grant with the California Department of Alcohol Beverage Control in the amount of $48,050.00 to enforce alcohol related crimes; and
WHEREAS, the City Council of the City of Los Banos may adjust the overall appropriation levels in each fund at any time during the FY 2024/2025 by action to amend this budget.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos does hereby approve the acceptance of the Alcoholic Beverage Control assistance grant in the amount of $48,050.00 to assist in the enforcement of alcohol related crimes and increase the appropriation limit for revenues within the State Grant Revenue fund in the amount of$ 48,050.00.

Revenues: State Grant: 100-000-334-010
Expenditures: Overtime: 100-421-190-103
Benefits 100-421-190-120
Travel/Training: 100-421-190-257
Special Departmental
Exp.: 100-421-190-73
$48,050.00
$39,526.00
$ 3,024.00
$ 3,000.00
$ 2,500.00
135
The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the 18th day of September 2024, by Council Member who moved its adoption, which motion was duly seconded by Council Member - -- ___ and the Resolution adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
136
137
ITEM 8A
LOsBanos
At the Crossroads of C,Jlifornia
Agenda Staff Report
TO: Mayor & City Council Members
FROM: Charles Bergson, P.E., Public Works Director/City En DATE: September 18, 2024
TYPE OF REPORT: Public Hearing
SUBJECT: Groundwater Sustainability Plan (GSP) Approval Recommendation:

That the City Council of the City of Los Banos acting as the City of Los Banos Groundwater Sustainability Agency (GSA) receive the staff report, open the Public Hearing, and receive public comment, close the Public Hearing and adopt a resolution approving the Groundwater Sustainability Plan for the San Joaquin River Exchange Contractors GSP Group in the Delta-Mendota Subbasin (5-022.07) dated July 2024 as it pertains to the City of Los Banos GSA.

Background:

In August 2014, the California Legislature passed, and in September 2014 the Governor signed, legislation creating the Sustainable Groundwater Management Act ("SGMA") "to provide local groundwater sustainability agencies with the authority and technical and financial assistance necessary to sustainably manage groundwater" (Wat. Code, § 10720, (d)). SGMA requires sustainable management through the development of groundwater sustainability plans ("GSP"), whi.ch can be a single plan developed by one or more groundwater sustainability agencies ("GSAs") or multiple coordinated plans within a basin or subbasin (Wat. Code, § 10727). SGMA requires a GSP to be developed and implemented to manage groundwater in all basins designated by the Department of Water Resources ("DWR") as medium or high priority, including the Delta-Mendota Subbasin (basin number 5-22.07).

As an exclusive GSA for a portion of the Delta-Mendota Subbasin, the GSA has the authority to draft, adopt, amend, and implement a GSP (Wat. Code, § 10725 et seq.; § 10728.4). The GSA was originally a member of the San Joaquin River Exchange 137
Contractors GSA Group formed for the purpose of developing a GSP and coordinating sustainable groundwater management in the Delta-Mendota Subbasin (Wat. Code, § 10723.6(i)). The other GSAs in the Delta-Mendota Subbasin initially prepared separate GSPs for other regions of the Delta-Mendota Subbasin for a total of six GSPs covering the entire Delta-Mendota Subbasin (each, a "GSP Group"). The GSAs from all six GSP Groups entered into a Coordination Agreement effective December 12, 2018 (the "Coordination Agreement"), to comply with SGMA and ensure that the multiple GSPs within the Delta-Mendota Subbasin would be developed and implemented utilizing the same methodologies and assumptions, that the elements of the GSPs are appropriately coordinated to support sustainable management, and to show how the multiple GSPs will achieve the sustainability goal for the Subbasin. The Coordination Agreement also established a Coordination Committee composed of representatives from each GSP Group, outlined information sharing obligations, procedures for resolving conflicts, and designated the Authority as the Plan Manager for the Delta-Mendota Subbasin. On January 6, 2020, the Subbasin Plan Manager submitted the Coordination Agreement and the six GSPs.

On January 21, 2022, DWR completed its review of all the GSPs in the Delta-Mendota Subbasin and released a letter determining that the GSPs for the Delta-Mendota Subbasin as a whole were "Incomplete" and identified deficiencies and corrective actions for the GSAs in the Delta-Mendota Subbasin to take. Amended or modified GSPs addressing the corrective actions from each GSP Group had to be submitted to DWR by July 20, 2022. However, in its March 2, 2023 Determination Letter, DWR deemed the Revised 2022 GSP "Inadequate." The main concern of DWR was that the six GSPs were not truly coordinated and using the same data and methodologies.

Under SGMA, if DWR deems a GSP or GSPs inadequate, this triggers the State Water Resources Control Board ("SWRCB") intervention process. (Wat. Code,§ 10735 et seq.).

As such, in response to DWR's "Inadequate" determination and prior to the Basin's probationary hearing (which is currently scheduled for sometime in the spring 2025), the GSAs in the Delta-Mendota Subbasin signed and executed a Memorandum of Agreement (the "MOA") on December 11, 2023, superseding the 2018 Coordination Agreement.

Through the MOA, the Parties agreed to mutually cooperate to adopt a single GSP (the "2024 GSP") for the Subbasin, and to implement the GSP within their respective GSA territories. The 2024 GSP synthesizes, updates, and replaces content from the Revised 2022 GSPs and Common Chapter to address the Corrective Actions outlined by DWR in its March 2023 "Inadequate" Determination Letter. The MOA becomes effective upon the adoption of the 2024 GSP. The MOA establishes a Coordination Committee to provide a forum for the GSA Groups to work collaboratively and develop recommendations for technical and substantive subbasin-wide activities.

Discussion:

In response to the Inadequate Determination Letter, the Delta-Mendota Subbasin GSAs, through the Coordination Committee, hired EKI to help prepare one GSP. The Subbasin GSAs have revised the Sustainable Management Criteria (SMCs) and Undesirable Results (URs) definitions to be the same throughout the Subbasin and agreed to set water level minimum thresholds at 2015 water levels. Among other items in the GSP, the 138
monitoring network, modeling and coordination efforts were updated to be consistent amongst the GSAs. Representatives of the Subbasin GSAs met with DWR and SWRCB staff on several occasions to get clarification on what was needed to have an approved GSP. Several GSAs also participated in hosting tours for SWRCB Board members and staff so that they could see the "boots on the ground" issues in the Subbasin. Additionally, the Subbasin adopted a Domestic Well Mitigation Policy and Application that will be adopted as part ofthe 2024 GSP.

The 2024 GSP was jointly prepared by all 23 GSAs and the following seven GSA Groups, which are comprised of all 23 GSAs: the Aliso Water District GSA Group; the Farmers Water District GSA Group; the Fresno County Management Areas A and B (FCMA) GSA Group; the Grassland GSA Group; the Northern Delta-Mendota GSA Group; the Central Delta-Mendota GSA Group; and the San Joaquin River Exchange Contractors (SJREC) GSA Group. In June 2024, the Coordination Committee posted a draft of the 2024 GSP on the Subbasin's website for public comment and held public workshops regarding the revisions to the GSP. After considering public comments and upon further discussion, on July 22, 2024, the Coordination Committee unanimously recommended that all GSAs in the Delta-Mendota Subbasin adopt the 2024 GSP.

On March 20, 2024, the Los Banos City Council adopted resolution 6746 amending the City's existing MOU's with the 23 neighboring Groundwater Management Agencies and joined a new MOU to create a single Groundwater Sustainability Plan. This hearing is for the adoption of the new single Groundwater Sustainability Plan.

The GSA is now holding a public hearing to consider adoption of a resolution to adopt the 2024 GSP for the • Delta-Mendota Subbasin and authorize submitting it to the SWRCB and posting it on the Subbasin's website.

There has been a link provided on the City's press release to the entire Groundwater Sustainability Plan, including the appendix.

A Notice of Public Hearing regarding the approval of the GSP by the Los Banos Groundwater Sustainability Agency (GSA) was published in the Westside Express on September 4, 2024.

Fiscal Impact:

There is no fiscal impact related to this item.

Josh
Attachments:

Resolution
Groundwater Sustainability Plan Executive Summary
Notice of Public Hearing
Press Release
Vanessa Portillo, Finance Director
139

THIS PAGE IS INTENTIONALLY LEFT BLANK
140
RESOLUTION NO. __ _

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

LOS BANOS ACTING AS THE CITY OF LOS BANOS

GROUNDWATER SUSTAINABILITY AGENCY (GSA)

APPROVING THE GROUNDWATER SUSTAINABILITY

PLAN FOR THE SAN JOAQUIN RIVER EXCHANGE
CONTRACTORS GSP GROUP IN THE DELTAMENDOTA SUBBASIN (5-022.07) DATED JULY 2024

AS IT PERTAINS TO THE CITY OF LOS BANOS GSA
WHEREAS, in August 2014, the California Legislature passed, and in September 2014 the Governor signed, legislation creating the Sustainable Groundwater Management Act ("SGMA") "to provide local groundwater sustainability agencies with the authority and technical and financial assistance necessary to sustainably manage groundwater" (Wat. Code, § 10720, (d)); and WHEREAS, SGMA requires sustainable management through the development of groundwater sustainability plans ("GSPs"), which can be a single plan developed by one or more groundwater sustainability agencies ("GSAs") or multiple coordinated plans within a basin or subbasin (Wat. Code, § 10727); and WHEREAS, SGMA requires a GSP to be developed and implemented to manage groundwater in all basins designated by the Department of Water Resources ("DWR") as medium or high priority, including the Delta-Mendota Subbasin (basin number 5-22.07); and •
WHEREAS, the City of Los Banos Groundwater Sustainability Agency ("GSA") was formed on January 18, 2017; and
WHEREAS, City of Los Banos GSA has the authority to draft, adopt, amend, and implement a GSP (Wat. Code,§ 10725 et seq.;§ 10728.4); and WHEREAS, on December 4, 2019, the City of Los Banos GSA adopted the Groundwater Sustainability Plan for portions of the Delta - Mendota Subbasin subject to the jurisdiction of the City of Los Banos GSA ("2019 SJRECGSA GSP") and submitted the SJRECGSA GSP to the California Department of Water Resources on January 23, 2020; and
WHEREAS, the 2019 SJRECGSA GSP was one of six separate and distinct Groundwater Sustainability Plans adopted for and within the San Luis & DeltaMendota Groundwater Subbasin pursuant to Water Code Section 107272, which authorizes multiple coordinated Groundwater Sustainability Plans within a single basin, and in accordance with a Coordination Agreement executed by all GSAs within the subbasin; and
141
WHEREAS, on January 21, 2022, California Department of Water Resources, Sustainable Groundwater Management Office, issued a notice advising the 2019 SJRECGSA GSP, along with the five other GSPs adopted within the basin by other GSAs, were deemed "incomplete" pursuant to Section 355.2 (e)(2) of SGMA Regulations; and
WHEREAS, the City of Los Banos GSA revised the 2019 GSP, and on December 4, 2019, following compliance with SGMA statutes, City of Los Banos GSA adopted the First Amended SJRECGSA GSP. The First Amended SJRECGSA GSP rescinded and superseded the 2019 SJRECGSA GSP; and WHEREAS, the First Amended SJRECGSAGSP and Appendices were submitted to DWR on July 13, 2022 (the "First Amended GSP"); and WHEREAS, DWR deemed the First Amended GSP "Inadequate" in its March 2, 2023 Determination Letter; and
WHEREAS, the Delta-Mendota Subbasin is now subject to the State Water Resources Control Board ("SWRCB") intervention process. (Wat. Code, § 10735 et seq.); and
WHEREAS, in response to DWR's March 2, 2023 "Inadequate" determination, the GSAs in the Delta-Mendota Subbasin signed a Memorandum of Agreement (the "MOA") on December 11, 2023, superseding the 2018 Coordination Agreement. Through the MOA, the Parties cooperated to develop a single GSP (the "2024 GSP") for the Subbasin, and to implement the GSP within their respective GSA territories. The 2024 GSP synthesizes, updates, and replaces content from the First Amended GSP and other GSPs adopted by GSAs within the Subbasin likewise deemed incomplete, in order to address the Corrective Actions outlined by DWR in its March 2023 "inadequate" Determination Letter. The MOA becomes effective upon the adoption of the 2024 GSP. The MOA establishes a Coordination Committee to provide a forum for the GSA Groups to work collaboratively and develop recommendations for technical and substantive subbasin-wide. activities; and
WHEREAS, the 2024 GSP was jointly prepared, and will be adopted, by all 23 GSAs within the basin; and
WHEREAS, on March 8, 2024, the Plan Manager for the Subbasin transmitted the 90-Day Notice to affected cities and counties notifying them of the City of Los Banos GSA intent to adopt the 2024 GSP at a public hearing to occur not earlier than 90 days from the date of the notice, and inviting consultation with the affected cities and counties; and
WHEREAS, on September 18, 2024, the City of Los Banos GSA held a public hearing to discuss and consider adoption of the 2024 GSP. 142
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Los Banos acting as the City of Los Banos GSA finds as follows:

1. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference.

2. After a public hearing, the City of Los Banos City Council hereby approves and adopts the final draft of the 2024 GSP, including its Appendices, in substantially the form presented, subject to such modifications as the executing officer shall approve, said execution to provide conclusive proof of approval of any such modifications.

3. The City of Los Banos GSA authorizes the Authority and its consultants, as the Plan Manager, to take such other actions as may be reasonably necessary to submit the 2024 GSP to SWRCB by December 31, 2024, and implement the purpose of this Resolution.

4. The 2024 GSP supersedes and replaces, for all purposes, the First Amended GSP, which shall be of no further force and effect.

The foregoing Resolution was introduced at a regular meeting of the City Council of the City of Los Banos held on the18th day of September, 2024, by Council Member _________ , who moved its adoption, which motion was duly seconded by Council Member ________ and the Resolution was adopted by the following vote:

AYES:

NOES:

ABSENT:

APPROVED:

Paul Llanez, Mayor
ATTEST:

Lucille L. Mallonee, City Clerk
143

THIS PAGE IS INTENTIONALLY LEFT BLANK
144
Executive Summary
Delta Mendota Subbasin GSP

EXECUTIVE SUMMARY
§ 354.4. Each Plan shall include the following general information:

DELTAMENDOTA
SGMA
(a) An executive summary written in plain language that provides an overview of the Plan and description of groundwater conditions In the basin.
621 23 CCR§ 354.4{a)
ES.1. Introduction
On 16 September 2014, the California legislature enacted the Sustainable Groundwater Management Act (SGMA) for the primary purpose of achieving and maintaining sustainability within the State's high and medium priority groundwater basins. Key tenets of SGMA are the preservation of local control, use of best available data and science, and active engagement and consideration of all beneficial uses and users of groundwater. SGMA requires local agencies to form Groundwater Sustainability Agencies (GSAs) that are tasked with managing basins sustainably through the development and implementation of Groundwater Sustainability Plans (GSPs). Under SGMA, GSPs must contain certain elements, the most significant of which include:
• Sustainability Goal;
• Description of the area covered by the GSP (i.e., the "Plan Area"); • Description of the Basin Setting, including the hydrogeologic conceptual model (HCM), historical and current groundwater conditions, and a water budget; • Locally-defined Sustainable Management Criteria (SMCs}; • Monitoring networks and protocols for monitoring each applicable sustainability indicator; and • Description of projects and/or management actions (P/MAs) that will be implemented to achieve or maintain sustainability.

SGMA also requires active stakeholder outreach to ensure that all beneficial uses and users of groundwater have the opportunity to provide input into the GSP development and implementation process. The organizational structure of the Delta-Mendota Subbasin (Basin) GSAs and GSA Groups is shown in Figure ES-1.

July 2024

Page 1 ends

EKI Environment & Water, Inc.
145
Executive Summary
Delta Mendota Subbasin GSP
July 2024
..... ~rtn,gsW0 1
hahaooWD'
.......
-·
1111111
Figure ES-1. Delta-Mendota Subbasin SGMA Governance Structure DELTAMENDOTA
SGMA

Page 1 ends

EKI Environment & Water, Inc.

MCA
PtrUH
146
Executive Summary
Delta Mendota Subbasin GSP
DELTA ..

MENDOTA
SGMA
The Basin is one of 21 basins and subbasins identified by the California Department of Water Resources (DWR) as in a "critically overdrafted" condition. This designation triggered an accelerated timetable for SGMA compliance, including GSP development by 2020 and achievement of sustainability by 2040.

In compliance with this timeline, the Basin GSAs submitted six GSPs, a Common Chapter, and a Coordination Agreement to DWR in January 2020 (2020 GSPs). DWR designated the 2020 GSPs as "incomplete" in January 2022 and identified four main deficiencies. In June 2022, the GSAs amended and resubmitted the six GSPs to DWR to address the identified deficiencies (2022 GSPs). In March 2023, DWR made a finding of "inadequate" after reviewing the 2022 • GSPs and determined that the Basin had sufficiently addressed only one out of the four deficiencies. As a result, the Basin is subject to the state intervention process defined in SGMA regulations and under California Water Code (CWC) §10735 et seq.

The first formal step of the state intervention process will be a public hearing convened by the State Water Resources Control Board (SWRCB) to consider designating the Subbasin as probationary based on any specific deficiencies in its GSP that remain unresolved at the time of hearing.

In response to DWR's "inadequate" determination, the 23 Basin GSAs collectively agreed to develop a single GSP for the Basin that synthesizes, updates, and replaces content from the 2022 GSPs and Common Chapter to address the Corrective Actions outlined by DWR. This single GSP has been developed to meet the SGMA regulatory requirements, respond to DWR's deficiencies, respond to comments provided by SWRCB staff during multiple consultation meetings, address public comments, and increase existing coordination among the Basin's 23 GSAs. This GSP provides a path to achieve sustainable groundwater management in the Basin and reflects a comprehensive approach by the Basin GSAs to correct the deficiencies identified by DWR, avoid probation with the SWRCB, and maintain local control of the Basin.

DWR identified three main deficiencies with the 2022 GSPs and identified Corrective Actions. Since submittal of the 2022 GSPs, the GSAs have incorporated substantial revisions into this single GSP in coordination with DWR and SWRCB staff. Revisions made in response to DWR's Corrective Actions are further detailed in Section 1.2 of this GSP.
• Deficiency #1: The GSPs do not use the Same Data and Methodologies. • Deficiency #2: The GSPs Have Not Established Common Definitions of Undesirable Results in the [Delta-Mendota] Subbasin.
• Deficiency #3: The GSPs in the [Delta-Mendota] Subbasin Have Not Set Sustainable Management Criteria in Accordance with the GSP Regulations.

In addition to revisions that were made to address DWR Corrective Actions, the GSAs updated this GSP to incorporate current data and information through Water Year (WY) 2023 and made revisions that address comments brought up during more than 10 consultation meetings with SWRCB and DWR staff and GSAled tours of the Basin with SWRCB members and staff to provide "boots on the ground" demonstrations of GSA efforts towards sustainability.

The Basin GSAs strongly believe that the revised GSP adequately addresses DWR's deficiencies and reflects a high degree of coordination between the Basin GSAs, DWR and SWRCB staff, and Basin stakeholders.

The Basin GSAs may exercise all powers granted to GSAs under SGMA to provide the maximum degree of local control and flexibility consistent with the Basin's Sustainability Goal as set forth in this GSP, including but not limited to all of the authorities provided in Chapter 4 (commencing with ewe § 10723), Chapter July 2024

Page 1 ends

EKI Environment & Water, Inc.
147
Executive Summary
Delta Mendota Subbasin GSP
DELTAMENDOTA
SGMA
5 (commencing with ewe § 10725), Chapter 6 (commencing with ewe § 10727), Chapter 8 (commencing with ewe§ 10730), and Chapter 9 (commencing with ewe § 10732) of SGMA.

ES.2. Sustainability Goal
The Sustainability Goal adopted by all GSAs in the Basin is as follows:
"The Delta-Mendota Subbasin will manage groundwater resources for the benefit of all users of groundwater in a manner that allows for operational flexibility, ensures resource availability under drought conditions, and does not negatively impact surface water diversion and conveyance and delivery capabilities. This goal will be achieved through the implementation of the proposed projects and management actions to reach identified measurable objectives and milestones through the implementation of the Groundwater Sustainability Plan(s) (GSP[s]), and through continued coordination with neighboring subbasins to ensure the absence of undesirable results by 2040."
ES.3. Plan Area
The Basin encompasses approximately 765,000
acres at the northwestern end of the San
Joaquin Valley Groundwater Basin within
portions of San Joaquin, Stanislaus, Merced,
Fresno, Madera and San Benito Counties. As
shown in Figure ES-2, the Basin shares
boundaries with nine adjacent groundwater
basins. To the north are the medium priority
Tracy Subbasin (DWR Basin No. 5-021.15) and
the critically overdrafted Eastern San Joaquin
Subbasin (DWR Basin No. 5-021.01); to the east
are the high priority Modesto and Turlock
Subbasins (DWR Basin No. 5-021.02 and No. 5-
021.03) and critically overdrafted Merced (DWR
Basin No. 5-022.04), Chowchilla (5-022.05), and
Madera {5-022.06) Subbasins; and to the south
are the critically overdrafted Kings (DWR Basin
No. 5-021.08} and Westside (DWR Basin No. 5-
021.09} Subbasins. These basins are managed
under their own GSPs and SGMA-related
activities but coordinate with the Basin GSAs to
address issues affecting boundary areas (e.g.,
accounting for groundwater subsurface inflows
and outflows and evaluating consistency of SMCs).
1::1 Delta-MendOta ~ (D'NR Basin No. 5-022.07)
calitomtaGl'OUM-Nato"BHO
□-... - ..... """' .. o:J Aliso wate-r Olstnd
,.,.. [Dc.n .. ,.,... ... ..-
m '"""" waler o;sm
Figure ES-2. Overview of Plan Area, GSA Groups, and
Groundwater Basins
The Basin is entirely covered by 23 exclusive GSAs, which are grouped into seven GSA Groups as shown in Figure ES-2. Lands within the Basin (the "Plan Area") are predominantly irrigated agriculture, including a diverse array of crop types and portfolios dictated largely by the economics of the farm economy and July 2024

Page 2 ends

EKI Environment & Water, Inc.
148
Executive Summary
Delta Mendota Subbasin GSP
DELTAMENDOTA
SGMA
water supply availability. Actively cropped agricultural lands encompass an estimated 416,000 acres of the Basin, or approximately 54 percent of the total area. Roughly 37 percent of the Plan Area consists of undeveloped lands (284,000 acres), and another two percent of lands are urban, suburban, and rural communities (15,000 acres). Water demands are met using an extensive series of water systems operated by multiple water agencies, cities, and private users. These systems are primarily supplied by imported surface water from the Central Valley Project (CVP) and minimally from the State Water Project (SWP), as well as surface water from the San Joaquin River system. Groundwater is also a key component of water supplies in the Basin and is relied upon for municipal and domestic uses, as well as agricultural and some managed wetland irrigation.

Fifteen census designated places within the Basin include the cities of Patterson, Newman, Dos Palos, Gustine, Los Banos, Firebaugh, and Mendota, and the communities of Grayson, Westley, Crows Landing, Santa Nella, Volta, Dos Palos Y, South Dos Palos, and Tranquillity.

Disadvantaged communities (DACs} and severely disadvantaged communities (SDACs} in the Basin are identified based on the median household income (MHI) of the area compared to the statewide MHI.

Approximately 66 percent of the Basin (507,000 acres} is covered by DWR-designated DACs or SDACs, including approximately 250,000 residents of the cities of Mendota, Firebaugh, Dos Palos, Gustine and the communities of Crows Landing, Dos Palos Y, Grayson, Westley, Volta, South Dos Palos, and Tranquillity.

Additionally, approximately 24 percent of the Basin (185,000 acres} is covered by DWR-designated economically distressed areas (EDAs).

ES.4. Stakeholder Outreach Efforts
The Basin GSAs developed a multi-pronged approach for public engagement during the development of this GSP, including the following components:
• Public Meetings: The Basin has held numerous meetings open to the public to discuss SGMA and GSP development and implementation. These include meetings of the Basin Coordination Committee, GSA Member Agency Boards and/or City Councils, County Boards of Supervisors, and the Northern and Central Delta-Mendota Region Management Committees. • Stakeholder Workshops and Education: The Basin, in partnership with several non-governmental organizations (NGOs), held several workshops and educational programs to increase public awareness and knowledge of SGMA. These efforts included informational stakeholder workshops, the 2024 Water Leadership Institute (WU} that focused on groundwater management within the Basin, and the Self-Help Enterprises (SHE} Community Water Needs Assessment. The Basin also hosted bilingual webinars and workshops on 10 May 2024, 7 June 2024, 22 April 2024, and 18 June 2024 to give an overview of the draft GSP and information on how to submit comments. Spanish translation was offered at these meetings. The Basin also hosts its own website dedicated to SGMA information: https://deltamendota.org/
• Direct Outreach: GSA staff made direct contact with community representatives to encourage their participation in the GSP development process. Outreach efforts included newsletters, GSA website updates, direct mail, local landowner meetings and workshops, bilingual informational emails to provide updates on GSA activities, and GSA-led tours of the Basin.

July 2024

Page 3 ends

EKI Environment & Water, Inc.
149
Executive Summary
Delta Mendota Subbasin GSP
DELTA ·

MENDOTA
SGMA
• DWR's Facilitation Support Services: In late 2023, Basin GSAs took additional steps to improve public outreach during the process of developing a single GSP for the Basin. The first step was to apply for Facilitation Support Services funds (FSS) through DWR. The FSS funds have primarily been used to set up and conduct public outreach meetings in the Subbasin to discuss the proposed single GSP with interested stakeholders.
• Draft GSP Review Opportunities. The GSAs published nine draft chapters on 30 April 2024 for public review. The GSAs incorporated comments and published the full draft Public Review Draft GSP on 29 May 2024.

In addition to the engagement opportunities provided above, the public was provided with opportunities to comment on both the 2020 and 2022 GSPs. This GSP has taken those comments into consideration.

ES.5. Basin Setting- Hydrogeologic Conceptual Model
The Basin is a long and narrow groundwater subbasin within the larger San Joaquin Valley Groundwater Basin, approximately 92 miles long and ranging between six and 18 miles wide. The Basin is bounded by geological and/or natural features, such as the Coast Range on the western Basin boundary and the San Joaquin River on the eastern Basin boundary, as well as jurisdictional boundaries such as the water purveyors whose service areas constitute the northern and southern Basin boundaries. The groundwater system in the Basin is comprised of various geologic units, including the Tulare Formation, terrace deposits, alluvium, and flood-basin deposits, and contains two principal aquifers.

The two principal aquifers defined in the HCM are referred to as the "Upper Aquifer" and "Lower Aquifer", between which the Corcoran Clay, a regionally extensive clay layer in the San Joaquin Valley, serves as a principal aquitard, or relatively impermeable layer. The semi-confined Upper Aquifer typically extends from the ground surface to the upper boundary of the Corcoran Clay. It includes both younger and older shallow alluvial deposits as well as the upper portions of the Tulare Formation. The confined Lower Aquifer extends vertically from the part of the Tulare Formation that is confined beneath the Corcoran Clay to the underlying San Joaquin Formation and the boundary where saline water of marine origin is first encountered. The Corcoran Clay pinches out along the western boundary of the Basin, allowing for some measure of interconnection between the Upper and Lower Aquifers in those areas.

The Basin contains several surface water features. The San Joaquin River is the largest river in the Basin and flows northwestward along or near the eastern Basin boundary. Several ephemeral creeks also run west to east throughout the basin, including Del Puerto Creek, Los Banos Creek, and Orestimba Creek. San Luis Reservoir, situated on San Luis Creek along the western boundary of the Basin, is a major reservoir that serves as an off-stream water storage facility for both the CVP and SWP. Also situated in the Basin is significant infrastructure that conveys imported water supplies, including the Delta-Mendota Canal, the California Aqueduct, and local canals.

July 2024

Page 4 ends

EKI Environment & Water, Inc.
150
Executive Summary
Delta Mendota Subbasin GSP
a (West)
300 ------·---·4'~ -~$-f"-~._-t'~~-i? ·-·-------~ -$~,
E-£'
0 ·300
·600
·900
x: ·309239
y: 8815926
x: ·301065
y: 8820660
Legend
■ Aquifer
Aquttard
x: ·292261
y: 8825404
Corcoran Clay from Page (1986)
20000ft
Vertical Exaggeration: 1 Ox
x: ·283458
y: 8830148
x: ·274655
y: 8834891
x: ·265851
y: 8839635
■
Geology Hydrostratlgraphy
Gravel }~-;~ ■ Gravel with fines
■ Sand
■ Sand wilh fines
}Aquitard
Silt & organics
Clay
x: ·257048
y: 8844379
DELTAMENDOTA
SGMA
x: ·248245
y: 8849122
B' (East)
Figure ES-3. Hydrogeologic Cross-Section in the Delta-Mendota Subbasin Applied irrigation water, direct recharge from ponds, and canal and streambed seepage contribute to the recharge of the Upper Aquifer within the Basin. Recharge to the Lower Aquifer primarily occurs east of the Basin along the western edge of the Sierra foothills. Some recharge within the Basin does occur via downward percolation between the Upper and Lower Aquifers at a very slow rate through the clay and composite wells. In addition, direct recharge and canal and stream seepage along the western edges of the Basin can occur where the Corcoran Clay is thin or non-existent.

Six hydrogeologic cross-sections were developed to illustrate the Basin physical characteristics and the underlying geologic formations, with an example cross-section shown in Figure ES-3. The cross-sections were developed by geospatial analysis of geologic information from well logs and Airborne Electromagnetic (AEM) data throughout the Basin. These cross sections help the GSAs better understand Basin subsurface conditions and support the development of the Basin water budgets (inflow-outflow analyses), refinement of the numerical groundwater flow model, and design of the SGMA representative monitoring networks.

July 2024

Page 5 ends

EKI Environment & Water, Inc.
151
Executive Summary
Delta Mendota Subbasin GSP
ES.6. Basin Setting- Existing Groundwater Conditions
Information on the Basin's current
groundwater conditions with respect to
the SGMA-defined "Sustainability
Indicators" are presented in this GSP
and include the following:

Groundwater Levels: Groundwater
levels within the Basin are presented
using contour maps depicting the 2015
and current (2023) seasonal high and "
for
seasonal
each
low
principal
groundwater
aquifer
elevations
(Upper
!, ~
Aquifer and Lower Aquifer) and
hydrographs for various wells across -"
, I IJ
the Basin depicting long-term ;. ,,.~
groundwater elevations, historical
highs and lows, and hydraulic gradients I
between principal aquifers. The
available data indicate that the

DELTA -

MENDOTA
SGMA
groundwater generally flows outward Figure ES-4. Upper Aquifer Groundwater Elevation from the Basin towards groundwater Hydrographs, 2015-2023 elevation lows in the neighboring Madera and Chowchilla Subbasins, with the exception of groundwater flow in the southeast direction along the southern boundary towards the Kings Subbasin. Differences in Upper Aquifer groundwater elevations between seasonal high and seasonal low conditions in WY 2023 can likely be attributed to consecutive Dry (WY 2020) and Shasta Critical (WY 2021 and WY 2022) water years prior to and during the seasonal low period of September and October 2022, which caused increased groundwater pumping. Hydrographs show the positive effects of surface water importation, managed aquifer recharge, and water banking activities in raising groundwater levels, tempered by the effects of the recent severe droughts and pumping outside of the Basin (see Figure ES-4).

Groundwater Storage: Changes in groundwater storage for the two principal aquifers over selected time periods of interest were calculated using the Central Valley Hydrologic Model Version 2 (CVHM2; Model) and compared to the volumes reported in the Basin's prior Annual Reports which were based on analytical estimates using groundwater elevations. The Model was refined based on local surface water delivery and pumping data for the period of WY 2003-2019, with reliable data primarily available after WY 2010 in most areas of the Basin. During the pre-SGMA period (WY 1970-WY 2014), the Basin experienced a cumulative Upper Aquifer groundwater storage decline of approximately -2,198,000 acre-feet (AF) and the Lower Aquifer groundwater storage decline of approximately -209,000 AF. During the post-SGMA period (WY 2015 - WY 2023), the Basin experienced a cumulative Upper Aquifer groundwater storage increase of approximately 62,000 AF and the Lower Aquifer groundwater storage decline of approximately -77,000 AF. The change in groundwater storage over the historical period generally corresponds with the variation in water year types. The increase of Upper Aquifer storage in post-SGMA years is primarily due to increased recharge during the period and wetter water year types, considering July 2024

Page 6 ends

EKI Environment & Water, Inc.
152
Executive Summary
Delta Mendota Subbasin GSP

DELTA -

MENDOTA
SGMA
that the average pumping from the Upper Aquifer during the post-SGMA period {308,000 acre-feet per year [AFY]) was generally similar to the pre-SGMA period. The groundwater storage volumes are calculated as the summation of simulated aquifer storage change and water release caused by subsidence, which represents changes in aquitard storage. Subsidence, and correspondingly water release caused by subsidence, are overestimated in the model. Furthermore, approximately 50% of historical subsidence is shown to be caused by pumping outside the Basin through sensitivity analysis conducted. Therefore, changes in storage values provided here are quite conservative and should be considered in understanding their level of uncertainty.

Water Quality: Drinking water is the most sensitive beneficial use in the Basin. The Basin employed the SWRCB's methodology for identifying constituents of concern (COCs) from State and Regional Water Board datasets and determined that the following are COCs for the Subbasin: arsenic, nitrate (as N), nitrate + nitrite (as N), 1,2,3-trichloropropane (1,2,3-TCP), gross alpha radioactivity, total dissolved solids (TDS), and hexavalent chromium. TDS concentrations above the secondary Maximum Contaminant Level (MCL) of 1,000 milligrams per liter (mg/L) are present in over half of the Upper Aquifer due to the prevalence of marine sediments. TDS concentrations in the southern part of the Upper Aquifer have historically been increasing due to the eastward migration of naturally saline water driven by groundwater elevation gradients spanning multiple subbasins.

Locally, correlation between water levels and groundwater quality has not been observed. The Basin's expanded Representative Monitoring Networks for Water Quality and Groundwater Levels will be used to improve understanding of any trends or correlations between groundwater management (extraction and recharge) and water quality.

Land Subsidence: Land
subsidence has been
documented within the San
Joaquin Valley over both
historical and recent
timeframes. The majority of the
San Joaquin Valley's inelastic
subsidence can be attributed to
pumping groundwater from
below the Corcoran Clay. Recent
subsidence measurements
indicate that within the Basin,
the greatest subsidence has
generally been observed along
the southeastern boundary and
in the Tranquillity Irrigation
District (TRID) area. Between
2015 and 2023, total vertical
displacement within the Basin
ranged from minor uplift on the
July 2024
0 ModestO ~ ,,
..,.,
= Canals and Aqueducts
• A SJRRP Subsidence Monitoring Point
Vertical Displacement (feet)
- -5.Sto-6
- -Sto-5.5
-4.5 to-5
-4 to -4.5
-3.5 to -4
-3to-3.S
-2.Sto-3
- -1to-1.5
- -0.Sto-1
- Oto-0.5
- 0.StoO
July 2012 - July 2023 (SJRRP Monitoring) .,.,___
~l.,:,: ~ - -
Figure ES-5. Land Subsidence July 2012 - July 2023

Page 7 ends

EKI Environment & Water, Inc.
153
Executive Summary
Delta Mendota Subbasin GSP
DELTA•

MENDOTA
SGMA
western margin of the Basin to approximately 2.2 feet of subsidence in the southeast {see Figure ES-5).

Land subsidence caused by factors within the GSA's authority to manage is due to aquitard depressurization following groundwater withdrawal within the Basin, which tends to be greater in the areas dependent on groundwater from the Lower Aquifer and are underlain by a greater proportion of fine-grained deposits, and in periods of drought. In contrast, most of the subsidence occurring on the Basin's eastern boundary is associated with hotspots centered east of the San Joaquin River caused by groundwater pumping outside of the Basin. As the GSAs do not have the authority to regulate this external pumping, the associated subsidence is not within the GSAs' ability to manage. In response to the identified subsidence-related risks, the Basin's Representative Monitoring Network tracks land subsidence and Lower Aquifer water levels throughout the Basin, with emphasis on high-risk areas. Furthermore, the GSAs are enacting P/MAs and coordinating with neighboring subbasins to address subsidence through reductions in Lower Aquifer pumping within and adjacent to the Basin.

Seawater Intrusion: The Basin is located far from coastal areas; therefore, seawater intrusion is not considered to be a relevant Sustainability Indicator.

Interconnected Surface Water: The Interconnected Surface Water (ISW) analysis of the Basin relies on natural surface water bodies delineated in the United States Geological Survey {USGS) National Hydrography Dataset (NHD) and The Nature Conservancy {TNC) ISW in the Central Valley (ICONS) datasets.

Perennial and intermittent surface water bodies are most likely to be ISW, while ephemeral surface water bodies are generally not ISW, as their channel bottoms remain significantly above the water table. Using the best available data, science, and tools, miles 16 to 106 of the San Joaquin River were identified as potential ISW (likely connected) and will be subject to the Depletion of ISW SMCs. The WY 2014 (preSGMA) depletion rate caused by pumping within the Basin is estimated to be 12,000 AFY within the potential ISW reaches (San Joaquin River) based on the Model, while the long-term historical average annual depletion rate caused by Basin pumping is approximately 7,000 AFY. The Current {WY 2019-2023) average annual depletion within these ISW reaches caused by pumping within the Basin is estimated to be approximately 13,000 AFY, comparable to pre-SGMA conditions.

ES.7. Basin Setting- Water Budget
·All GSAs in the Basin coordinated and collaborated on the development and application of the Model to evaluate Basin conditions. The Model is based on the use of a three-dimensional (3-D) groundwater flow model that uses the USGS CVHM2 - San Joaquin Valley (CVHM2-SJV) groundwater modeling platform.

This water budget provides an accounting of the total annual volume of water entering and leaving the Basin for Historical (WY 2003 -WY 2018), Current (WY 2019 -WY 2023), and Projected Future (WY 2024 - WY 2073) conditions. The water budgets are presented for the two interconnected water budget systems quantified by the Model the: (1) land-surface water system, and (2) groundwater system within the Basin.

For the land-surface water system, the change in storage is typically negligible and averages to zero in long-term periodical averages. For the groundwater system, modeling results show that the Basin had an average annual net groundwater storage change of -24,000 AFY, -6,000 AFY, and -19,000 AFY during the Historical, Current, and extended Historical through Current (WY 2003 - WY 2023) periods, respectively, indicating a consistent yet decreasing loss in storage since 2003.

July 2024

Page 8 ends

EKI Environment & Water, Inc.
154
Executive Summary
Delta Mendota Subbasin GSP
DELTA·

MENDOTA
SGMA
In addition, the Basin has experienced a consistent loss of storage due to water release caused by subsidence equaling-105,000 AFY, -173,000 AFY, and -120,000 AFY during the Historical, Current, and WY 2003 - WY 2023 periods, respectively. However, validation of Model results indicate that the subsidence rates and extent are overestimated in the Model, leading to overestimation of water release caused by subsidence. Furthermore, sensitivity analysis conducted as part of the Model application suggests that as much as 50 percent of the subsidence (and subsequent loss of storage) simulated within the Basin is caused by pumping in adjacent basins. Consequently, addressing subsidence and its associated water release cannot be achieved solely through actions within the Basin. Coordination with neighboring basins and regional improvements in groundwater conditions will be required.

Considering the impacts of neighboring areas on Basin overdraft, the Basin Sustainable Yield was conservatively estimated to be approximately between 281,000 to 384,000 AFY over the WY 2003 - WY 2023 period, depending on the period selected (historical, current, or WY 2003-2023). Absent the impacts of neighboring basins on subsidence in the Basin, the sustainable yield over the same period was conservatively estimated to be approximately between 337,000 AFY to 485,000 AFY. The Sustainable Yield is based on results using Model-calculated groundwater pumping and recharge to quantify the volume of water that, if pumped over the water budget period of interest, would have resulted in zero change in storage. The range provided is an estimate based on the historical and current periods, as required by 23 CCR§ 354.18.(b)(7). The Sustainable Yield of the Basin will change and likely increase in the future due to the implementation of P/MAs and should be ultimately defined based on the sustainable management criteria outlined in the GSP, as the volume of Basin-wide groundwater extraction that does not lead to Undesirable Results.

Water budget information under Projected future conditions was also developed for the Basin using the Model and a SO-year "analog period" based on hydrologic input from the years 1973 to 2022, with water supply assumptions (i.e., changes to imported water supplies) and DWR-provided inputs for climate variables (i.e., adjusted precipitation and evapotranspiration). The Projected future water budget assesses the magnitude of the net water supply deficit under future conditions that would need to be addressed through P/MAs to prevent Undesirable Results and achieve the Sustainability Goal. Five projected water budget scenarios and one P/MA scenario were developed for this analysis and the results are summarized in Table ES-1:
1) Projected Baseline;
2) Projected 2030 Central Tendency Climate Change;
3) Projected 2070 Central Tendency Climate Change;
4) Projected 2070 Extreme Dry Climate Change;
5) Projected 2070 Extreme Wet Climate Change; and,
6) Projected 2030 Central Tendency Climate with Projects and Management Actions (P/MAs) and Adaptive Management Pumping Reduction Plan (PRP)
July 2024

Page 9 ends

EKI Environment & Water, Inc.
155
Executive Summary
Delta Mendota Subbasin GSP
DELTA·

MENDOTA
SGMA
Table ES-1. Basin Water Budget Summary by Scenario
Scenario Climate Period Change in Groundwater
Storage (AFY)
Historical WY 2003-2018 -24,000
Current WY 2019-2023 -6,000
Overdraft Evaluation Period WY 2003-2023 -19,000
Projected Baseline WY 2024-2073 Analog -24,000
Projected 2030 Central Tendency WY 2024-2073 Analog with DWR 2030 -26,000 Climate Change Climate Change
Projected 2070 Central Tendency WY 2024-2073 Analog with DWR 2070 -28,000 Climate Change Climate Change
Projected 2070 Extreme Dry WY 2024-2073 Analog with DWR 2070 -34,000 Climate Change Climate Change
Projected 2070 Extreme Wet WY 2024-2073 Analog with DWR 2070 -8,000 Climate Change Climate Change
Projected 2030 Central Tendency WY 2024-2073 Analog with DWR 2030 +5,000 Climate Change with P/MAs and Climate Change
Adaptive Management Pumping
Reduction
The wide spectrum of changes projected by extreme dry and wet 2070 climate change scenarios showcase the significant uncertainty in projected Basin conditions. The Basin has designed an adaptive P/MA framework with the capacity and flexibility to effectively respond to projected changes and their corresponding inherent uncertainty in the Basin. As discussed in Section ES-10, the Basin GSAs have a robust plan to address the estimated overdraft (i.e., 140,000 AFY over the WY 2003-2023 period), avoid Undesirable Results, and reduce groundwater pumping to within the Sustainable Yield by 2040 through implementation of P/MAs, including the PRP.

The simulation of projected conditions under 2030 Central Tendency Climate Change Scenario with planned P/MAs and PRP indicates that the Basin will not experience Undesirable Results from chronic lowering of groundwater levels during its implementation period (by WY 2040) or after (by WY 2073}.

Furthermore, the projected P/MA scenario indicates that the Basin would achieve an average balanced water budget by 2040, maintaining groundwater storage over WY 2015 conditions for the entire projected period (WY 2024-2073} in the Upper Aquifer and WY 2041-2073 in the Lower Aquifer, reaffirming the sufficiency of P/MAs and the PRP designed under this GSP. It is worth noting that these results include overestimation of the rate and extent of subsidence and, consequently, the total storage loss in the Basin, and therefore, considered quite conservative.

The above notwithstanding, it is important to note that there are inherent limitations in using the Model to predict future conditions given the uncertainties surrounding remaining data gaps, lack of full calibration of the Model for subsidence and water levels, complex hydrogeology and climate change July 2024

Page 10 ends

EKI Environment & Water, Inc.
156
Executive Summary
Delta Mendota Subbasin GSP
DELTA·

MENDOTA
SGMA
assumptions, and dynamic interconnections with adjacent basins. Despite efforts to address these uncertainties within the GSP's adaptive management framework, existing data limitations and significant sources of uncertainty will require updates and modifications to the Model, the results, and associated policies and P/MA implementation.

ES.8. Sustainable Management Criteria
The SMCs are the metrics by which groundwater sustainability is evaluated under SGMA. Uniform definitions for the following SMC components have been developed in the GSP through a coordinated effort of the GSAs within the Basin.
• Undesirable Results: Undesirable Results are the significant and unreasonable occurrence of conditions, for any of the six Sustainability Indicators, that adversely affect beneficial uses and users in the Basin.
• Minimum Thresholds (MTs): MTs are the numeric criteria for each Sustainability Indicator that, if exceeded in a locally defined combination of monitoring sites, may constitute an Undesirable Result for that indicator.
• Measurable Objectives (MOs): MOs are specific, quantifiable goals for the maintenance or improvement of groundwater conditions. MOs use the same units and metrics as the MTs allowing for direct comparison.
• Interim Milestones (IMs): I Ms are a set of target values representing measurable groundwater conditions_ in increments of five (S) years over the 20-year statutory deadline for achieving sustainability.

Table ES-2 summarizes the SMCs for each applicable Sustainability Indicator in the Basin.

July 2024

Page 11 ends

EKI Environment & Water, Inc.
157
Executive Summary
Delta Mendota Subbasin GSP
DELTAMENDOTA
SGMA
Table ES-2. SMC Summary
Sustainability Undesirable Results Criteria Indicator
Chronic At least one of the following
Lowering of occurs as a result of
Groundwater groundwater management
Levels within the Basin:

1. Groundwater levels
decline below the
established MTs in 25
percent or more of the
RMW-Wls for two
consecutive years, or

2. More than 10 drinking
water wells are reported
as dry in any given year, or

3. More than 170 drinking
water wells are
cumulatively reported dry
by 2040 {10 wells per year
over 17 years).

Reduction in Chronic Lowering of
Groundwater Groundwater Levels Used as a
Storage Proxy
Seawater Not Applicable
Intrusion
Degraded MTs for a groundwater quality
Water Quality COC are exceeded in 15
percent of the RMW-WQs in
three consecutive semiannual
monitoring events and are
caused by groundwater
management within the Basin.

July 2024
Minimum Threshold Measurable
Objective
2015 Low Groundwater 2015 High
Elevation (Measured or Groundwater
Approximated Based on Elevation
Available Data and Allowing for (Measured or
a Minimum of 20 Feet of Approximated)
Operational Flexibility Between
the MO and MT)
Chronic Lowering of Chronic Lowering
Groundwater Levels Used as a of Groundwater
Proxy Levels Used as a
Proxy
Not Applicable Not Applicable
The greater concentration of The MT
either: concentration for

1. The applicable health-based each RMW-WQ
screening standard {MCL). and COC

2. The baseline condition at
each RMW-WQ, defined as
the average measured
concentrations in either: (1)
the last calendar year with
data in the period of 2010-
2014; or if no data are
available from 2010-2014,
(2) the first calendar year
with data after 2014 plus
the maximum annual
fluctuation range.

Page 12 ends

EKI Environment & Water, Inc.
158
Executive Summary
Delta Mendota Subbasin GSP
Sustainability Undesirable Results Criteria
Indicator
Land The extent or rate of
Subsidence subsidence exceeds the
applicable MT at any RMS-LS as
a result of groundwater
management within the Basin,
based on a 5-year moving
average.

Interconnected MT is exceeded for two
Surface Water consecutive years caused by
groundwater extraction within
the Basin.

Justification of Sustainable Management Criteria:

Minimum Threshold
Extent: 2.0 ft of cumulative
subsidence between 2020 and
2040
Rate: Maximum five year
moving average rate of

0.2 ft/year of subsidence
Model-estimated Basin-wide
depletion rate of 12,000 AFY
DELTAM ENDOTA
SGMA
Measurable
Objective
Extent: 0.0 ft of
cumulative
subsidence after
2040
Rate: 0.0 ft/yr of
subsidence after
2040
Model-estimated
Basin-wide
depletion rate of
6,700 AFY
The primary beneficial uses and users of groundwater in the Subbasin include groundwater pumpers, drinking water users, environmental beneficial users, and surface water rights holders. The SMCs in Table ES-2 were developed to prevent significant and unreasonable impacts to groundwater uses and users and are justified (i.e., will not result in significant and unreasonable impacts) as follows for all applicable Sustainability Indicators.

Chronic Lowering of Groundwater Levels
• The MTs for Chronic Lowering of Groundwater Levels were established to ensure that they are sufficiently protective of Undesirable Results defined for all other relevant Sustainability Indicators for the Basin, as "setting groundwater level MTs at or above 2015 groundwater elevations will avoid undesirable results for other Sustainability Indicators beyond undesirable results that occurred before, and had not been corrected by, January 1, 2015" (SWRCB, 2024a). • Impacts to Beneficial Users: Basin GSAs plan to implement a Well Mitigation Program to address potential impacts to domestic and small community wells from the Chronic Lowering of Groundwater Levels. A robust Basin-wide well impacts analysis was conducted to quantify potential impacts to beneficial users if groundwater levels reach their MTs, which was compared to the Chronic Lowering of Groundwater Levels Undesirable Results definition. Even in the worstcase scenario where all Representative Monitoring Wells for Chronic Lowering of Groundwater Levels (RMW-WLs) decline to MT groundwater levels, a maximum of 98 drinking water wells are expected to be impacted. Since the criteria for Undesirable Results for Chronic Lowering of Groundwater Levels is based on only 25 percent of RMW-WLs reaching their MTs, the number of impacted wells is projected to be significantly less. Further, since the Well Mitigation Policy (Appendix N) is designed be able to address at least 170 dry wells by 2040, even the "worst case" potential impacts are anticipated to be manageable. The Basin calculated the "depletion of supply" for this scenario to quantify the percentage of urban supply volume that may be impacted if groundwater levels decline to their MTs. Under the worst-case scenario, only 4.5 percent of the total estimated urban water supply volume would be impacted by 2040. This depletion of supply July 2024

Page 13 ends

EKI Environment & Water, Inc.
159
Executive Summary DELTA·
Delta Mendota Subbasin GSP MENDOTA
SGMA
is not considered to be significant and unreasonable, and the MTs were determined to be sufficiently protective of all groundwater pumpers, including drinking water wells users.

Furthermore, the GSAs have adopted a policy to address MT exceedances observed in any individual RMW-WL as they occur, with the intent of preventing well dewatering. • Consideration of Adjacent Basins: Since the MTs are set at the actual or interpolated 2015 Low groundwater levels, water levels under the MTs do not differ significantly from actual Fall 2015 water levels for both the Upper and Lower Aquifers. Therefore, it is not expected that the MTs will substantially alter groundwater level gradients beyond those experienced in 2015 or impact any adjacent basins' ability to achieve their respective sustainability goals.

Reduction of Groundwater Storage: If all RMW-WLs were to decline from Fall 2014 water levels to their Chronic Lowering of Groundwater Level MTs, the percent of usable storage would decrease by approximately 10 percent in the Upper Aquifer and remain relatively unchanged in the Lower Aquifer, which is equivalent to the reduction of storage that is not deemed to be significant and unreasonable.

Furthermore, since the criteria for Undesirable Results for Chronic Lowering of Groundwater Levels is based on only 25 percent of RMW-WLs reaching their MTs, the percent reduction in usable storage volume that would occur at the point of Undesirable Results for Chronic Lowering of Groundwater Levels would be less than 10 percent. This analysis demonstrates that SM Cs for Chronic Lowering of Groundwater Levels are protective against significant and unreasonable effects for Reduction of Groundwater Storage.

Degraded Water Quality
• Impacts to Beneficial Users: The MT for Degraded Water Quality is set as the greater concentration of either: (1) the applicable health-based screening standard 1, or (2) the baseline condition at each Representative Monitoring Well for Degraded Groundwater Quality (RMW-WQ), which is either:
(1) the last calendar year with data in the · period of 2010-2014 plus the maximum annual fluctuation range if observed at each RMW-WQ; or if no data are available from 2010-2014, (2) the first calendar year with data after 2014 plus the maximum annual fluctuation range if observed at each RMW-WQ. 2 Primary MCLs are health-based regulatory drinking water standards set to protect drinking water use, which is generally the most sensitive beneficial use. • A significant portion of the Basin has historically degraded water quality. Therefore, in some areas of the Basin, it is appropriate to set MTs as a baseline condition, as "the plan may, but is not required to, address undesirable results that occurred before, and have not been corrected by, January 1, 2015" (CWC § 10727.2(b)(4)). Further, while the extent of naturally degraded water quality in the Basin may be significant, it is not unreasonable given that it is largely due to naturallyoccurring aquifer conditions and is not related to GSA management of the Basin. • Consideration of Adjacent Basins: The MTs for Degraded Water Quality are not expected to impact adjacent basins' ability to achieve their sustainability goals, as MTs are set based on regulatory thresholds or baseline concentrations. Additionally, the water level MTs are not expected to cause 1 The Maximum Contaminant Level (MCL) set by the SWRCB Division of Drinking Water (DDW) was used as the applicable health-based screening standard for all COCs.
2 Maximum annual fluctuation range is determined based on measurements within any one year. Measurements from 1950 to 2015 are prioritized for determining the maximum annual fluctuation range.

July 2024

Page 14 ends

EKI Environment & Water, Inc.
160
Executive Summary
Delta Mendota Subbasin GSP
DELTAMENDOTA
SGMA
significant changes to existing local groundwater gradients and are thus anticipated to be protective in terms of minimizing increased migration of poor-quality water from the Basin.

Land Subsidence
• Impacts to Beneficial Users: The criteria for Undesirable Results are justified because the MTs for Land Subsidence are tied back to the design standards for critical infrastructure within the Basin, which accommodate an additional 2.0 feet of inelastic subsidence by 2040. The criteria recognize that small amounts of subsidence could occur in some locations without negatively affecting the critical infrastructure, and that only to the extent that subsidence causes a loss of functional capacity does it qualify as significant and unreasonable. • Consideration of Adjacent Basins: The SMCs for Land Subsidence were set to prevent additional inelastic subsidence from occurring after 2040 as a result of Basin groundwater management; This approach is generally consistent with the approach taken in the adjacent Chowchilla and Merced Subbasins, where the local GSAs also intend to prevent further inelastic subsidence after 2040. In recognition that avoidance of Undesirable Results due to Land Subsidence in the Basin crucially depends on successful management of subsidence hotspots in adjacent basins, the Basin GSAs will continue to coordinate with agencies in adjacent basins during GSP implementation to address subsidence hotspots. Similar to water quality above, while the observed subsidence rates in the Basin may be considered to be significant, they are not unreasonable to the extent that they are caused by factors outside of the Basin and outside of GSA control.

Depletion of Interconnected Surface Water
• Impacts to Beneficial Users: The criteria for Undesirable Results are justified because the MTs for the Depletion of ISW are tied back to the surface water depletion rate caused by groundwater extraction (pumping) within the Basin prior to the enactment of SGMA on January 1, 2015. The component of the criteria requiring two consecutive years of MT exceedances provides for confirmation that the depletion of ISW is chronic and not an anomaly. • Consideration of Adjacent Basins: The MTs for the Depletion of ISW are not expected to impact adjacent basins' ability to achieve their sustainability goals, as MTs are set based on pre-SGMA depletion conditions. Additionally, the Chronic Lowering of Groundwater Levels MTs are not expected to cause significant changes to existing local groundwater gradients and are thus anticipated to be protective in terms of preventing additional Depletion of ISW due to groundwater pumping.

Relationships Between Sustainability Indicators
• Chronic Lowering of Groundwater Levels and Reduction in Groundwater Storage are directly, if not linearly, related. As shown in Table ES-2, groundwater level MTs are used as a proxy for Reduction of Groundwater Storage. If water levels in all RMW-WLs were to exceed MTs, approximately 10 percent decline in Upper Aquifer would occur relative to the baseline and Lower Aquifer would remain relatively unchanged, which is equivalent to the reduction of storage deemed to not be significant and unreasonable.
• Few contemporaneous and collocated water level and groundwater quality data exist for the Basin's COCs, and where they do exist, no clear correlation between Degraded Water Quality and July 2024

Page 15 ends

EKI Environment & Water, Inc.
161
Executive Summary DELTA·
Delta Mendota Subbasin GSP MENDOTA
SGMA
Chronic Lowering of Groundwater Levels (and Reduction of Groundwater Storage, by proxy), has been established. The Basin's proposed monitoring will further clarify the potential relationship between water quality and groundwater management during GSP implementation, including through collaboration with the Central Valley-Salinity Alternatives for Long-term Sustainability (CVSALTS) Prioritization and Optimization study, in which the Basin is serving as an archetype study area (CV-SALTS, 2024}.
• Historical inelastic land subsidence has been attributed to Chronic Lowering of Groundwater Levels, particularly due to pumping from the Lower Aquifer outside of and within the Basin. The MTs for Chronic Lowering of Groundwater Levels are set to prevent declines in water levels beyond 2015 conditions, thus they are intended to prevent additional inelastic land subsidence due to pumping within the Basin.
• A potential effect of Undesirable Results due to Land Subsidence is a Reduction of Groundwater Storage due to compaction that can occur in fine-grained layers during groundwater pumping, especially from the Lower Aquifer. The Chronic Lowering of Groundwater Levels MTs are used as a proxy for Reduction of Groundwater Storage and were demonstrated to be protective of Undesirable Results due to Reduction of Groundwater Storage. Chronic Lowering of Groundwater Level SMCs are also protective of Undesirable Results due to Land Subsidence. Through the correlation with Chronic Lowering of Groundwater Level SMCs, it is reasonable to conclude that Land Subsidence MTs will not cause an unreasonable Reduction of Groundwater Storage. • Studies suggest that consolidation of subsurface layers with high clay content may liberate arsenic and cause Degradation of Groundwater Quality. However, there has been no observed correlation between Land Subsidence and any water quality COCs in the Basin. RMW-WQs have been selected in areas with historical subsidence to continue to monitor the potential relationship between subsidence and arsenic.
• The MTs for Chronic Lowering of Groundwater Levels are set to prevent declines in water levels beyond 2015 conditions, and thus are intended to prevent additional Depletion of ISW. • The Chronic Lowering of Groundwater Levels MTs are used as a proxy for Reduction of Groundwater Storage and were demonstrated to be protective of Undesirable Results due to Reduction of Groundwater Storage. Chronic Lowering of Groundwater Level SMCs are also protective of Undesirable Results due to Depletion of ISW. Through the correlation with Chronic Lowering of Groundwater Level SMCs, it is reasonable to conclude that Depletion of ISW MTs will not cause an Unreasonable Reduction of Groundwater Storage. • Changes in surface water-groundwater interaction are likely to impact the Upper Aquifer's water quality in areas primarily impacted by San Joaquin River seepage, due to the different water qualities of the river and the underlying Upper Aquifer. However, due to lack of sufficient data, no direct correlation could be discerned between Depletion of ISW and Degraded Water Quality. As more data are gathered from the Representative Monitoring Sites for Interconnected Surface Water {RMS-ISW) and RMW-WQ, these correlations will be reassessed and considered.

July 2024

Page 16 ends

EKI Environment & Water, Inc.
162
Executive Summary
Delta Mendota Subbasin GSP
ES.9. Monitoring Network
The objective of the design and management of
the SGMA Monitoring Network is to collect
sufficient data to support assessment of the
Sustainability Indicators relevant to the Basin, and
the impacts to the beneficial uses and users of
groundwater. The proposed SGMA Monitoring
Networks are improved to ensure sufficient spatial
distribution and spatial density. In the Basin, the
SGMA Monitoring Network consists of 108 RMWWLs) and (by proxy) groundwater storage (Figure ES-6), 90 RMWs for monitoring
groundwater quality, 42 representative
monitoring sites (RMS) for monitoring land
subsidence (including survey points,
extensometers, and Global Positioning System
[GPS] sites), and 25 RMWs along with nine stream
gauges for monitoring depletions of
interconnected surface water. The Basin will
continue to incorporate Interferometric Synthetic
Aperture Radar {lnSAR) data to assess land
subsidence across the Basin.

The SGMA Monitoring Networks for the Basin
supplement other active monitoring networks and
programs in the Basin such as DWR's California
DELTAMENDOTA
SGMA
01 7·03
07 Figure ES-6. Upper Aquifer Representative
Monitoring Network for Water Levels
3•
_;00<1
I
7-010
Statewide Groundwater Elevation Monitoring (CASGEM) program, Irrigated Lands Regulatory Program (ILRP), CV-SALTS, and San Joaquin River Restoration Program (SJRRR).

Data collected from the SGMA Monitoring Networks for the Basin will be uploaded to the Delta-Mendota Subbasin Data Management System (DMS) that is maintained for the Basin and reported to DWR in accordance with the Monitoring Protocols developed for the Basin. Data collected will undergo quality assurance and quality control reviews at the GSA level prior to being uploaded in the DMS. Additional data collected as part of other regular monitoring programs implemented within the Basin may be used in conjunction with data collected from the SGMA Monitoring Networks to meet compliance with GSP Regulations regarding annual reporting (23 CCR § 356.2) and Periodic Reviews (23 CCR § 356.4), or as otherwise deemed necessary by the GSAs. The OMS will continue to be updated as new data are collected.

ES.10. Projects and Management Actions
Achieving sustainability in the Subbasin will require implementation of P/MAs to address projected water budget deficits that contribute to groundwater level and storage declines and land subsidence, and also to address water quality impacts. As such, the GSAs have developed a portfolio of P/MAs, each with specific expected benefits, implementation triggers, and costs. For purposes of this GSP, the P/MAs have been organized into tiers based on implementation status or anticipated implementation date, where July 2024

Page 17 ends

EKI Environment & Water, Inc.
163
Executive Summary
Delta Mendota Subbasin GSP

DELTA -

MENDOTA
SGMA
"Tier 1" P/MAs have been implemented since 2020 and are currently operational, "Tier 2" and "Tier 3" P/MAs have expected implementation dates by 2030 and 2040 respectively, and "Tier 4" P/MAs will be implemented after 2040 or as needed. For example, the Basin GSAs are currently developing and intend to implement a PRP by January 2025 ("Tier 2" P/MA) that will achieve a 42,000 AFY reduction in pumping from the Basin by 2030.

The supply augmentation and demand reduction P/MAs identified by the Basin GSAs comprise a diverse portfolio of options that can be implemented as necessary to achieve sustainability from a total water quantity and water quality perspective. Additionally, if MT exceedances occur, accelerated implementation of P/MAs could be triggered, following steps outlined in the PRP.

A general implementation
schedule, or "glide path", has
been developed to show how
200,000
the expected benefits from E 1so,ooo :3. i---------
current and planned P/MAs ~ :,
will address the average g
annual overdraft of 1100,
000 C
approximately 140,000 AFY !
.. by 2040 (see Figure ES-7). By ;
~ 50,000 2040, approximately 30
2025
I Pumping Reduction
2030 2035 2040
I Augmented Supply I Adaptive Management
percent of overdraft is
projected to be addressed
through pumping reduction
P/MAs and approximately 70
percent through supply
augmentation P/MAs, which Figure ES-7. Projects and Management Actions Glide Path in turn will increase or stabilize Basin groundwater levels. Due to uncertainties in the glide path relating to water supplies for supply augmentation projects and hydrologic conditions under climate change scenarios, a sensitivity analysis was conducted to ensure that the planned P/MAs are adaptable in the event of extreme conditions. Under each of these extreme scenarios, the Basin will still be on track to achieve sustainability by 2040.

The Model was also applied to predict future water level conditions with the implementation of the P/MAs and to assess if Undesirable Results 3 would be expected to occur in the Basin between now and 2040 under 2030 Central Tendency Climate Change Scenario. Specifically, the hydrographs at 71 of the RMWWls that are explicitly represented in the Model were evaluated to assess if more than 25 percent of them exceeded their MT between now and 2040. 4 Based on a review of the hydrographs against the SM Cs, 3 For the purposes of this assessment, this portion of the Decline in Groundwater Levels Undesirable Results definition was used: "Groundwater levels decline below the established MTs in 25 percent or more of the RMW-Wls for two consecutive years (i.e., based on measurements from two seasonal high groundwater level periods and two seasonal low groundwater level periods)".
4 Because some of the RMW-Wls did not have any historical data or have not yet been constructed they were not explicitly represented in the Model. As such this analysis assumed that as long as no more than 25 percent of the 71 RMW-Wls exceed that MT, then by inference no more than 25 percent of the entire RMW-WL network will exceed the MT and create an Undesirable Result.

July 2024

Page 18 ends