Cities Index.
Agenda packet

Los Gatos City Council
March 15, 2022

Document
Agenda packet
Meeting
March 15, 2022
Body
Los Gatos City Council
Pages
319
Original file
47.4 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 21

DEVELOPMENT SERVICES
Zoning Research
Other Planning Division Fees
Payment of Application Fees
All application fees are to be paid at the time the applications are submitted to the Community Development Department. If the applicant withdraws an application, which requires a hearing by the Planning Commission, prior to processing the application for the hearing, 40% of the paid application fee shall be refunded to the applicant at the discretion of the Director of Community Development. All other fees are non-refundable. 225 Basic Zoning Letter $155.00 $160.00
226 Legal non-conforming verification $650.00 $672.00
227 Reconstruction of legal non-conforming structures
(Burndown Letter)
$276.00 $285.00
228 Fence Height Exceptions $276.00 $285.00
229 Peer/Technical Review - any remaining deposit will
be refunded to the applicant and amounts exceeding
the deposit amount will be paid by applicant
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
230 Fees For Additional Tech Review and/or DRC Review - DRC beyond three meetings, Planning Commission
hearing beyond two meetings, Town Council hearing
beyond one meeting
Fully allocated hourly rate of all
personnel involved plus additional
fees
231 Consultation Actual cost on an hourly basis
232 Research Services Minimum Charge Fully allocated hourly rate for all personnel with initial $200.00 deposit
233 Building Permit Plan Check Fee 20% of building fee
234 Below Market Price Housing Program In-Lieu Fee 6% of the building permit valuation for the entire project
235 Outdoor Seating Permit Fully allocated hourly rate for all personnel with initial $1,000.00
deposit
236 Valet Parking Permit Fully allocated hourly rate for all personnel with initial $1,000.00
deposit
237 Parklet Program Fully allocated hourly rate for all personnel with initial $1,000.00
deposit

Page 182 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 22

DEVELOPMENT SERVICES
Engineering Division
The following fees constitute a comprehensive listing of the various fees charged by the Engineering Program. Certain types of application/permits must be reviewed and/or processed by other Town departments or public agencies, which may charge separate fees. Applicants are advised that the fees for those services are not included in the Engineering Program's fees.

Where the term "actual cost (s)" is used here it shall mean: materials, supplies (including any costs of noticing or publication), outside consultants and employee cost, (including salary, benefits and overhead).

Engineering Plan Check Fee (Public Improvements & Grading Permits) * Inspection Fee (Public Improvements & Grading Permits)
238 Application Fee $490.00 $507.00
239 Under $20,000.00 15.5% of valuation
240 $20,000.00 to $80,000.00 $3,100.00 $3,205.00 plus 9% of valuation
241 Greater than $80,000 $8,500.00 $8,789.00 plus 8.5%
valuation
242 Each additional plan check beyond three reviews Fully allocated hourly rate for all personnel
243 Under $20,000.00 7.5% of valuation
244 $20,000.00 to $80,000.00 $1,500.00 $1,551.00 plus 6.5% of valuation
245 Greater than $80,000.00 $5,400.00 $5,584.00 plus 4.0% of valuation

Page 183 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 23

DEVELOPMENT SERVICES
Work In or Use of Public Right-of-Way *
NPDES
246 Encroachment Permit - Residential Work up to $4,000.00 - $305.00 $316.00
Each additional $2,000.00 - $160.00
$165.00
247 Encroachment Permit - Collector/Arterial Streets** Work up to $4,000.00 - $1,580.00 $1,634.00
Each additional $2,000.00 - $345.00
$357.00
248 Outside contractor underground utility locating
surcharge (actual cost for outside contractor
inspection fee may change)
$95.00
249 Temporary Encroachment Permit $150.00 $155.00
250 Dumpster Permit $150.00 $155.00
251 Storage Permit $150.00 $155.00***
* Work done at night or on weekends shall be charged the actual costs of staff ** Single-family residences located along collector and arterial streets to be charged the residential fees above
*** $500.00 refundable Storage Unit Removal Deposit, to cover cost of removal, if abandoned 252 Inspection Fee - Grading Permits Single Family Residential $730.00 $755.00
Commercial or Multi Family
Residential $1,135.00 $1,174.00
253 Inspection Fee - Encroachment Permits and Some
Storage Permits
Single Family Residential $200.00
$207.00
Commercial or Multi Family
Residential $325.00 $336.00
Plus $485.00 $501.00 per LID facility
254 Inspection of Storm Water Treatment Measures $500.00 $517.00 per facility 255 Annual Stormwater/Limited Impact Development (LID)
Permit
Per Visit and 1st facility inspection
$485.00 $501.00
Every additional facility inspection
$160.00 $165.00
256 C-3 Permit Hydrologic Calculation Fully allocated hourly rate for all personnel plus any outside cost and
initial deposit of $3,750.00

Page 184 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 24

DEVELOPMENT SERVICES
Engineering Subdivision Map Checking
Traffic Impact Analysis or Parking Study
Storm Drainage Fees
257 1-4 lots $2,855.00 $2,952.00*
258 5 or more lots $3,995.00 $4,131.00*
*Plus, initial $3,000 surveyor deposit. Additional deposit(s) of actual surveyor costs may be required for larger projects than 5 or more lots, additional map check review(s), or overall complexity of the map.
259 Development Review (staff traffic impact analysis or Parking Study)
Actual Cost
Consultant Report - Consultant Fee
260 Staff Review Fee $664.00 $687.00 plus 10% of the
traffic consultant report cost
261 Site Distance Analysis $178.00 $184.00 per review not to exceed two hours. Actual cost for
staff time when analysis exceeds two
hours.
262 Traffic Impact Mitigation Fee $958.00 $991.00 per new average daily trip generated
263 Development Projects Single family lots Section

24.60.035(b) (3): For subdivision
whose lots exceed one acre, the fee
shall not exceed that of one acre per
lot $4,228.00 $4,372.00/ac.

Multiple family dwelling units - initial
unit $4,228.00 $4,372.00/ac.

Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $159.00 $164.00
Commercial, industrial, hospitals,
churches, schools, and others
$5,286.00 $5,466.00/ac.
264 Building/Grading Permits (Building, Structures, &
impervious areas)
New impervious surface area, per sq.
ft. $1.00/sq. ft.

Page 185 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 25

DEVELOPMENT SERVICES
Street Improvement In-Lieu Fee
Other In-Lieu Fee
Hauling Permits
Construction Activities Mitigation Fee (Ordinance 2189) Other Engineering Fees
265 Sidewalks $16.00/sq. ft. $20.00/sq.ft.
266 Curb and Gutter $68.00/lf. $100.00/lf.
264 Trail Improvements $16.00/per sq. ft. or determined by Director
268 House Moving Fee $3,490.00 $3,609.00*
269 Hauling (Overweight Vehicle) Permit Daily $16.00**
Annual $90.00
**The current State mandated fee is $16.00 for Hauling Permit. If the State fee changes, the Hauling Permit fee will change to reflect the same.
*Plus initial deposit of $5,000 for facilities damage
270 New Buildings and Additions Residential (per square foot added) $1.17/sq.ft. $1.19/sq.ft.*
Non-residential (per square foot
added) $1.17/sq.ft. $1.19/sq.ft.*
*These two fees are adjusted based on the Building Cost Index 271 Engineering Reversion to Acreage $2,395.00 $2,476.00 plus initial deposit of $2,500 for surveyor
272 Engineering Lot Merger $3,480.00 $3,598.00 plus surveyor deposit
273 Engineering Lot Line Adjustments $3,480.00 $3,598.00 plus surveyor deposit
274 Certificate of Compliance $3,480.00 $3,598.00 plus surveyor deposit
275 Abandon Excess Public Right-of-Way & Public
Easement
$4,345.00 $4,493.00 plus surveyor
and valuation consultant and
planning services

Page 186 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 26

DEVELOPMENT SERVICES
Other Engineering Fees (continued)
276 Geotechnical Peer Review Fees Fully allocated hourly rate of all personnel plus any outside costs and
initial $2,500 deposit. Larger projects
require an initial deposit of $4,500 to
allow for a site visit by the
geotechnical peer review consultant.
277 Separate Instrument Dedication Fee (for dedication
via grant deeds and not maps)
$720.00 $744.00 plus initial deposit
of $2,500 for surveyor
278 Slurry Seal Fee $2.50 per sq.ft.
279 Flood Review Fee Consultant Cost plus 25% Admin Fee 280 Miscellaneous Review Fee* Actual Cost
*This fee will be implemented for services including, but not limited to, wet weather inspections, annual inspections, review of operations and maintenance reports, coordination with property owner(s) and/or homeowner associations, etc.

Page 187 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 27

LIBRARY SERVICES
Lost or Damaged Items
In lieu of above, account holder may replace lost/damage item with new identical copy plus $2.00 processing fee.

Internet printing and copies
History Project Digital Image
1 Replacement of Adult book/AV item Cost of item plus $10.00 processing fee
2 Replacement of Teen/Children’s book/AV item Cost of item plus $5.00 processing fee
3 Replacement of Adult paperback Cost of item plus $5.00 processing fee
4 Replacement of magazine Cost of item plus $5.00 processing fee
5 Printing per page - Black and White Copies $0.15
6 Printing per page - Color Copies $0.25
7 Fair Use Fees (for personal use only) Free – Downloaded via History Website
8 Commercial Use Fees $25.00 per high resolution image

Page 188 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 28

PARKS AND PUBLIC WORKS SERVICES
Parks Division
Oak Meadow Park
Picnic Areas (1 through 9)
Bandstand/Gazebo
Minimum two-hour reservation required.

Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only. 1 Facility Fee Resident $95.00 per site
Non-Resident $150.00 per site
2 Facility fee w/Jump House Permit Resident $190.00 per site Non-Resident $300.00 per site
3 Non-Profit Event Resident $65.00 per hour
Non-Resident $120.00 per hour
4 Public Event Resident $95.00 per hour
Non-Resident $150.00 per hour
5 Deposit (refundable) $500.00
6 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
7 Deposit (refundable) $100.00
8 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
9 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
10 Deposit (refundable) $100.00

Page 189 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 29

PARKS AND PUBLIC WORKS SERVICES
Other Oak Meadow Park Fees
Creekside Sports Park
Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only.

Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor (Groups of 25+ and/or Jump House) Single Use Permit
11 Bocce Ball Court Fee Resident $95.00 per day
Non-Resident $150.00 per day
12 Parking Fee Resident No Charge
Non-Resident $6.00 per vehicle
13 Vehicle Escort Fee Resident $75.00
Non-Resident $100.00
14 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
15 Deposit (refundable) $500.00
16 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
17 Additional Day Resident $55.00 per additional day
Non-Resident $75.00 per additional
day
18 Deposit (refundable) $500.00
19 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
20 Deposit (refundable) $100.00

Page 190 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 30

PARKS AND PUBLIC WORKS SERVICES
Multi-Use Permit
Multi-Use Permit for recreational/educational purposes only.

Town Plaza Use Permit
A permit fee is $55.00 per hour for events that close the Town Plaza entirely to the public. This fee will be charged for the number of hours the Town Plaza cannot be used safely by the public due to the event. Additional fees or deposits may be charged for lawn repair, street closures, and/or additional maintenance, as determined by the Parks and Public Works Director and/or Maintenance Superintendent.

Civic Center Lawn Use Permit
A permit fee is $55.00 per hour for events that restrict the use of the Civic Center Lawn.

Additional fees or deposits may be charged for lawn repair, street closures, and/or additional maintenance, as determined by the Parks and Public Works Director and/or Maintenance Superintendent.

Turf Maintenance Fee
Additional fee added to any Park Use or Special Event Permit, when a permit's scheduled activity or event will negatively impact the park turf, (locations including but not limited to Oak Meadow, Town Plaza, and Civic Center lawn areas). The fee amount is to be based upon best estimate of turf repair cost, as determined by the Director of Parks and Public Works and/or Maintenance Superintendent.
21 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
22 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
23 Deposit (refundable) $100.00

Page 191 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 31

PARKS AND PUBLIC WORKS SERVICES
Tree Related Fees
Equipment Hourly Rates as Follows
24 Tree Removal Permit Application* One Tree $250.00
Additional Tree $125.00/each
If application is denied 50% refund
25 Illegal Tree Removal Administrative Fee $330.00
26 Replacement Trees - Town Forestry Fund Per Tree
Ordinance Section 29.10.0985
Tree cost for each 24”,36", and/or
48" box size will be the Market Price
plus the installation cost, determined
by the Director
*Fee will be waived if tree removal is done to implement or maintain Defensible Space. 27 Pick-up Truck $32.00
28 1 Ton Flatbed Truck $42.00
29 Utility Truck $57.00
30 Dump Truck (10 Wheel) $85.00
31 Dump Truck (Bobtail) $63.00
32 Paint Truck $85.00
33 Line Remover $26.00
34 Tractor Loader $63.00
35 Backhoe $85.00
36 Rubber-tired Loader $85.00
37 Roller $63.00
38 Van $37.00
39 Concrete Saw $32.00
40 Air Compressor $32.00
41 Arrowboard $32.00
42 Generator $26.00
43 Chainsaw $20.00
44 Blower $10.00
45 Paving Box $63.00
46 Rodder $63.00
47 High Pressure Sewer Cleaner $117.00
48 Brush Chipper $42.00
49 Chipper Truck $63.00
50 Aerial Unit $92.00
51 Street Sweeper $92.00
52 Forklift $42.00
53 Trailer $42.00
54 Message Board $10.81
55 Barricades $0.23

Page 192 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 32

PARKS AND PUBLIC WORKS SERVICES
Equipment Hourly Rates as Follows (continued)
Streets Division
Hazard and/or Debris Removal
Special Events Fees
Electric Vehicle Charging Fee
56 Cones $0.15
57 Portable Generators $28.04
58 Staff time spent to conduct hazard and or debris
removal caused by citizen negligence
Fully allocated hourly rate of all
personnel plus any outside costs
59 Staff and equipment for special event requests Fully allocated hourly rate of all personnel
60 System Connection Fee $1.00
61 Hourly Charge - 1- 4 hours $1.00/hour
62 Hourly Charge - after 4 hours $5.00/hour

Page 193 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 33

POLICE SERVICES
Printing and Copying Charges
Photographs
Concealed Weapons
Tow Trucks
Massage Permit Fees
Fee covers staff time to process application, review pertinent documents, arrange for fingerprints and photographs to be taken and obtain all necessary approvals.

Special Events
Other Special Police Services – Pursuant to Agreement between Police Chief and Requestor. 1 8 1/2" x 11 and 8 1/2" x 14 $.25 per page
2 Copy - Digital $10.00 per device
3 For the first 3 $42.00
4 Each Additional $13.00
5 Permit Fee, DOJ Fee, and Admin Fee $100.00
6 Renewal Permit $25.00
7 Amended Permit $10.00
8 Tow Permit $95.00
9 Driver Permit $370.00
10 Initial Application for each Therapist $213.00
11 Annual Renewal for each Therapist $107.00
12 Massage Establishment Permit (initial and
subsequent renewals) (Ord 14.110.075)
$415.00
13 ABC Application No charge
14 No Parking Signs $0.46/each
15 Officer Staffing Fully allocated hourly rate of all
personnel
16 Bingo Permit $170.00

Page 194 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 34

POLICE SERVICES
Motion Picture/Television/Commerical Still Photo
Emergency Response Caused By
Alarm Fees
Citation issued for failure to display appropriate Permit or placard. Dismissal fee in lieu of full Bail Amount
Parking Permit Fees
Residential Parking Permit
17 For-Profit Groups (each) $1,609.00
18 Non-For-profit Groups (each) $579.00
19 DUI Emergency Accident Response (Government
Code Section 53155)
Actual costs incurred up to
$12,000.00
20 Second Response due to Disturbances At current billing rate 21 Commercial Alarm Registration Fee $95.00
22 Second False Alarm* $170.00
23 Third False Alarm* $170.00
24 Fourth False Alarm* $170.00
25 Fifth False Alarm* No response, no charge, at the
Chief’s discretion
*Within a six-month period within a calendar year
26 Handicap CVC22507.8/22500(1) $37.00
27 Parking Permits $10.00
28 Annual residential parking permit/per vehicle (Limit 4 per residence)
$42.00
29 Visitor guest passes Two (2) complimentary with the
purchase of the primary permit
30 Special Event Permit -First permit (one day) $10.00
31 Special Event Permit -Each Additional (one day) $2.00 32 Replacement permit for vehicle change (within
calendar year)
$10.00
33 Lost permit replacement $37.00
34 Damaged permit replacement (with return of permit) $18.00

Page 195 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 35

POLICE SERVICES
Parking Permit Fees (continued)
Business Parking Permit
Construction Parking Permit
Other Police Fees
35 Standard Employee annual $248.00
36 Lost permit replacement $37.00
37 Damaged permit replacement (with return of permit) $18.00 38 One day parking permit per construction vehicle $32.00 39 Each additional day per vehicle $5.00
40 Fingerprinting - per each Livescan application (Plus additional DOJ or FBI fees which are based on the
level of service for the application) Fingerprint fees
are subject to increase based on DOJ or FBI fees
$80.00
41 Subpoena Duces Tecum Per California Evidence Code Section 1563
42 Solicitor/Peddler's Permit $55.00 plus fingerprinting 43 Bicycle Licenses (each) $3.00
44 Taxicabs Permit $185.00 per business
45 Clearance Letter $25.00
46 Horse Drawn Vehicle Permit $270.00
47 Firearms Storage Fee $245.00 Admin Fee plus $1.00 per firearm per day for storage
48 Vehicle Release $235.00
49 Vehicle Repossession Release Fee (Government Code
Section 41612)
$15.00
50 Non-Los Gatos Cite Sign Off $27.00
51 Feral Cat Feeder/Trap Permit $42.00

Page 196 ends
Page 197 ends

RESOLUTION 2022-

RESOLUTION OF THE TOWN COUNCIL

OF THE TOWN OF LOS GATOS

CONTINUING DEPARTMENT FEES, RATES, AND CHARGES, AND AMENDING CERTAIN FEES, RATE, AND CHARGES FOR FY 2022/23
WHEREAS, The Town of Los Gatos follows best municipal financial practices that require the Town to establish and maintain all user charges and fees based on the cost of providing services; and
WHEREAS, the last update of the Town of Los Gatos Comprehensive Fee Schedule was adopted on March 19, 2019; and
WHEREAS, those fees currently in effect will remain in effect without interruption, certain of these shall be increased, and certain new services shall have fees.

NOW, THEREFORE, THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES HEREBY RESOLVE:

1. That Resolution 2019-010, “Resolution of the Town Council of the Town of Los Gatos Continuing Department Fees, Rates, and Charges, and Amending Certain Fees, Rates, and Charges for FY 2019/20” is hereby rescinded; and

2. The Town of Los Gatos Comprehensive Fee Schedule, attached hereto as Exhibit AScenario 2, shall become effective July 1, 2022.

ATTACHMENT 2

Page 198 ends

PASSED AND ADOPTED at a regular meeting of the Town Council held on the 15th day of March 2022 by the following vote:

COUNCIL MEMBERS:

AYES:

NAYS:

ABSENT:

ABSTAIN:

SIGNED:

MAYOR OF THE TOWN OF LOS GATOS

LOS GATOS, CALIFORNIA
DATE: __________________
ATTEST:

TOWN CLERK OF THE TOWN OF LOS GATOS

LOS GATOS, CALIFORNIA
DATE: __________________

Page 199 ends

C A L I F O R N I A
Tow n o f L o s G ato s
Comprehensive Fee Schedule (Redlined)
Fiscal Year 2022/23
ATTACHMENT 2, EXHIBIT A

Page 200 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule

TOWN OF LOS GATOS FEE SCHEDULE
The following Fee Schedule is effective July 1, 2022 through June 30, 2023, unless updated by the Town Council. The Fee Schedule will be adjusted annually by the average Consumer Price Index (Bureau of Labor Statistics, U.S. Department of Labor for the San Francisco/Oakland/San Jose Metropolitan Statistical Area) for the calendar year and/or by the percentage increase in actual operating costs for the current year – whichever is greater. The average increase in the CPI for 2019, 2020, and 2021, was 3.2%, 1.7% , and 3.4% respectively, for a cumulative cost of living increase of 8.5% since 2019. Fees are adjusted with a 5.9% CPI increase, which is halfway between the 3.2% and 8.5%. This Fee Schedule also provides for minimum annual adjustments for those fees that are directly related to personnel costs. Other adjustments may be made to maintain consistency with the surrounding municipalities within the Town of Los Gatos region but in no case are fees charged in excess of service delivery costs.

Page 201 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule

TABLE OF CONTENTS
Administrative Services......................................................................................................... 1 Attorney Services.................................................................................................................. 3 Development Services
General Development Fees ............................................................................................................ 4 Building Division Fees ..................................................................................................................... 6 Building Permit Fees....................................................................................................................... 6 Electrical Permit Fees...................................................................................................................... 9 Mechanical Permit Fees................................................................................................................ 11 Plumbing Permit Fees................................................................................................................... 12 Other Fees..................................................................................................................................... 13 Planning Division Fees......................................................................................................……………14 Zoning Approvals .......................................................................................................................... 15 Subdivisions .................................................................................................................................. 18 Miscellaneous Application Fees.................................................................................................... 19 Environmental Assessment Fees.................................................................................................. 19 Other Fees..................................................................................................................................... 21 Engineering Division Fees............................................................................................................. 22 Library Services ................................................................................................................... 27 Parks and Public Works Services
Parks Division Fees........................................................................................................................ 28 Oak Meadow Park Fees ................................................................................................................ 28 Creekside Sports Park Fees........................................................................................................... 29 Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor Park Fees......................................... 29 Town Plaza Use Permit ................................................................................................................. 30 Turf Maintenance Fee................................................................................................................... 30 Tree Related Fees.......................................................................................................................... 31 Equipment Hourly Rates............................................................................................................... 31 Street Division Fees....................................................................................................................... 32 Police Services..................................................................................................................... 33 Parking Permit Fees...................................................................................................................... 34

Page 202 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 1

ADMINISTRATIVE SERVICES
Town Facilities Use
Town approved non-profit fundraising activities are allowed in/on Town facilities with an appropriate permit, or license issued by the Town, or provided in an agreement or Conditional Use Permit with the Town. Private events are not allowed in the Council Chambers with the exception of approved events hosted by the tenants of 106 and 108 East Main Street as stated in tenant lease agreements. The available Town facilities are listed below:
• Civic Center Lawn, Deck and Stairs
• Civic Center West Patio
• Council Chambers
• Council Chambers Lobby (as a stand-alone facility)
• Civic Facilities Conference and Meeting Rooms
Copy and Printing Charges
Special Events
1 Fee for Town Hall Facilities Use Non Profit: $0.00 per hour 2 Building Attendant $20.00 per hour
3 Copy of Town Code Actual Cost
4 8 1/2 x 11 and 8 1/2 x 14 $.25 per page
5 11 x 17 $.35 per page
6 Oversized or Large Productions Actual Cost
7 Annual Subscription for Town Code Supplements Actual Cost 8 Copying of Zoning Ordinance Actual Cost
9 Annual Subscription for Zoning Ordinance
Supplements Actual Cost
10 Certification of Town Records $2.00
11 Annual Financial Report Actual Cost
12 Annual Budget Actual Cost
13 Capital Improvement Plan Actual Cost
14 Special Event Application Fee, For-Profit New Event $910.00 Repeat Event $680.00
15 Special Event Application Fee, Not-For Profit New Event $227.00 Repeat Event $170.00
16 Special Event Road Closure Review Fee $225.00
17 Block Party Permit $55.00

Page 203 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 2

ADMINISTRATIVE SERVICES
Business License
Other Services
18 Business License Processing Fee - New Out of Town $20.00 In Town $40.00
19 Business License Processing Fee - Renewal Out of Town and In Town $30.00 20 Compact Disk or Tape of Council and Planning
Commission Meetings (plus actual mailing costs, if
applicable)
$20.00 per DVD for meetings under 2
hours
$30.00 per DVD for meetings over 3
hours
21 Copy - Digital $10 per device
22 Initial Returned Check Fee $25.00
23 Subsequent Return Check Fees [CA Civil Code Section
1719(a) (1)] $35.00
24 Election Filing Fee $25.00
25 Credit Card Processing Fee for all transactions above $30.00 2.40%
26 Request for Service Not Covered by any Other Fee
Fully allocated hourly rates for all
personnel

Page 204 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 3

ATTORNEY SERVICES
1 Conditions, Covenants & Restrictions (CC&R) Review
and Approval
Fully allocated hourly rates for all
personnel
2 Simple Covenant/Deed Restriction Fully allocated hourly rates for all personnel
3 Subdivision Improvement Agreements Fully allocated hourly rates for all personnel
4 Encroachment Agreements Fully allocated hourly rates for all personnel
5 Miscellaneous (Legal Agreements, Real Property, etc.) Fully allocated hourly rates for all personnel

Page 205 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 4

DEVELOPMENT SERVICES
General Development Fees
Reports, Agendas, and Minutes
1 Reproduction (sent out) plus actual mailing costs, as applicable. Maps, plans, etc. (larger than 11" x 17")
Actual Cost - sent to San Jose
Blueprint
2 Data Duplication service and fee for partial or full
copies of each digital standard Town data file on onetime request basis. 8 1/2" x 11" copy, standard $.25 per page
3 Document Storage Fee - Laserfiche Actual Cost
4 Duplicate Plans Set $154.00/hr. (1/2 hr. minimum)
5 Research Records Charge for Staff Research beyond
30 minutes
Fully allocated hourly rate for all
personnel
6 Address Processing Fee - per address $160.00 $169.00
7 Computer Surcharge on all
Building/Plumbing/Mechanical/Electrical/Grading/En
croachment/Planning Permits/Applications and any
other Permits/ Applications except Park
Permit/Applications
4% of development application fee
8 Engineering Development Review Service Fee -
Building Permit and Building Plan Check*
5% of permit or plan check
9 Request for Service Not Covered by Any Other Fee Actual Cost 10 Pre-application Conference Fee Courtesy meeting
11 Applications for Work Unlawfully Completed Double current application fee 12 BMP Document Processing Fee $575.00 $609.00
13 Community Benefit No standard schedule, as offered and applied per project
13 Public Art In-Lieu Fee 1% of building permit valuation *These fees are applied to permits or plan checks that require engineering services. 14 Development Review Committee Agendas $37.00
15 Planning Commission Agendas $25.00
16 Planning Commission Minutes Actual Cost
17 Plan Copies - microfiche or other reprints sent to an outside firm
$31.00 plus costs
18 Plan Copies - blueprint reproduction in house $3.00 per page 19 Copy of Subdivision Ordinance $26.00
20 General Plan (including maps) $26.00
21 Hillside Specific Plan $5.80
22 Hillside Development Standards and Design
Guidelines
$19.45

Page 206 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 5

DEVELOPMENT SERVICES
Reports, Agendas, and Minutes (continued)
Landscape
Final occupancy clearance (new construction or remodel) Basis:

Development Review Committee Meetings – 1.5 hrs. (estimate) Site Visits – 4.0 hrs. (estimate)
Review Plan – 4.0 hrs. (estimate)
*Note: Time spent over and above the initial application fee will be billed at the current employee billing rate plus equipment hourly rate.

Annexation Fees
Any remaining deposit will be refunded to the applicant and amounts exceeding the deposit amount will be paid by applicant.
23 Commercial Design Guidelines $20.50
24 Subdivision Ordinance $26.00
25 General Plan/Zoning Maps (24" x 36") - Black & White $9.00 26 General Plan/Zoning Maps (24" x 36") - Color $42.00
27 Blossom Hill Open Space Study $14.00
28 Commercial Specific Plan Report $12.00
29 Residential Design Guidelines $21.50
30 Housing Element Technical Appendix $24.75
31 2015-2023 Housing Element $39.00
32 Los Gatos Boulevard Plan $9.50
33 North Forty Specific Plan (adopted June 2015) $45.25 34 Park Staff Time Spent for Major Development
Applications
$543.00*
35 1 Lot $3,010.00 $3,188.00*
36 2 Lots $1,505.00 $1,594.00*
37 3 Lots $1,005.00 $1,064.00*
38 4 Lots $755.00 $800.00*
39 5 Lot or more $600.00 $635.00*
*Annexation Advertising Deposit (varies as to size of map) - $1,000.00 to $2,200.00

Page 207 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 6

DEVELOPMENT SERVICES
Seismic Hazards Mapping Program Fee (SMIP)
For residential construction of three stories and less (Category 1), the permit fee is $13.00 per $100,000. For all other construction (Category 2), the permit fee is $28.00 per $100,000. This fee is required by the State of California to identify and map zones of particular seismic hazards.

Five percent of the fee is retained by the Town to be used solely for earthquake preparedness.

Capital Improvement Tax (Construction)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area of an existing building.

Underground Utility Tax (Utilities)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area of existing building.

Park Fund Tax (Parks)
Based on $0.04 for each square foot of building addition or alteration, which increases floor area of an existing building.

Building Division
Building Permit Fees
Building Permit Fees for New Construction and Addition
The fee for each building permit shall be based upon the 1997 Uniform Building Code as amended by the 2010 California Building Code.

A building valuation regional modifier of 2.32 shall be used in conjunction with the Building Valuation Data provided in the publication, Building Valuation Data, published by the International Code Council – February 2012. Hillside Homes shall use a modifier of 3.246 and Commercial Office Tenant Improvements shall use a modifier of 1.16. The Building Valuation Data will be increased yearly by the Engineering News Record (ENR) Annual Building Cost Index (BCI) for every year thereafter.
40 Fee for issuing/reinstating a Building Permit $55.00 $58.00 41 Additional Building Permit Fee $30.00 $32.00
42 Demolition Permit Residential: $265.00 $281.00
Commercial: $465.00 $492.00

Page 208 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 7

DEVELOPMENT SERVICES
Building Permit Fees for New Construction and Addition
Total Valuation Fee
43 $1.00 to $500.00 $32.99 $35.00
44 $501.00 to $2,000.00 $32.99 $35.00 for the first $500.00 plus $4.28 $4.53 for each additional
$100.00 or fraction thereof, to and
including $2,000.00
45 $2,001.00 to $25,000.00
$97.23 $103.00 for the first $2,000.00
plus $19.66 $20.82 for each
additional $1,000.00 or fraction
thereof, to and including $25,000.00
46 $25,001.00 to $50,000.00
$549.32 $582.00 for the first
$25,000.00 plus $14.18 $15.02 for
each additional $1,000.00 or fraction
thereof, to and including $50,000.00
47 $50,001.00 to $100,000.00
$903.83 $957.00 for the first
$50,000.00 plus $9.83 $10.41 for
each additional $1,000.00 or fraction
thereof, to and including $100,000.00
48 $100,001.00 to $500,000.00 $1,395.23 $1,478.00 for the first $100,000.00 plus $7.86 $8.32 for
each additional $1,000.00 or fraction
thereof, to and including $500,000.00
49 $500,001.00 to $1,000,000.00 $4,540.19 $4,808.00 for the first $500,000.00 plus $6.67 $7.06 for
each additional $1,000.00 or fraction
thereof, to and including
$1,000,000.00
50 $1,000,001.00 and over $7,874.69 $8,339.00 for the first $1,000,000.00 plus $4.42 $4.68 for
each additional $1,000.00 or fraction
thereof

Page 209 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 8

DEVELOPMENT SERVICES
Building Permit Fees for Remodels, Alterations, and Repairs The Building Official shall establish the valuation of said improvements, and fees will be assessed as per Valuation Schedule above.

Special Services & Inspections
Plan Review Fee
A plan review fee shall be charged at the time of filing application. This fee is separate from and shall be in addition to the building permit fee. This fee is calculated at sixty-five percent (65%) of the building permit fee as per the valuation schedule starting on page 6.

Other Miscellaneous Factors to Determine Construction Valuation 51 Inspection outside normal business hours (4 hr.
minimum)
$192.00/hr. $203.00/hr.
52 Re-inspection fees $160.00/hr. $169.00/hr.
53 Inspections for which no fee is specifically indicated (2 hr. minimum)
$160.00/hr. $169.00/hr.
54 Additional plan review required by changes, additions or revisions to plans (1 hr. minimum)
$152.50/hr. $161.00/hr
55 For use of outside consultants for plan checking
and/or inspections Actual Cost
56 Services for which no fee is specifically indicated (1/2 hr. minimum)
$160.00/hr. $169.00/hr.
57 Permit/Plan check time extension (per permit)
(applies to permits that have not expired)
$78.00 $83.00
58 Express plan review or initial review (1 hr. minimum) $160.00/hr. $169.00/hr. 59 Application for the Appeals Building Board Review $273.00 $289.00 60 Temporary Certificate of Occupancy $1,095.00 $1,160.00

Page 210 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 9

DEVELOPMENT SERVICES
Other Miscellaneous Factors to Determine Construction Valuation (continued) Special Systems Fees
Electrical Permit Fees
61 Convert Garage to habitable space $117.00/sq. ft. $124.00/sq.ft. 62 Convert unfinished basement or attic to habitable $127.00/sq. ft. $134.00/sq.ft. 63 Pools/Spas (gunite) $76.00/sq. ft. $80.00/sq.ft.
64 Siding - aluminum/vinyl/wood $32.00/sq. ft. $34.00/sq.ft. 65 Antennas & Towers Const.Value As Applied under
valuation schedule on page 6
66 Commercial Awning or Canopy Aluminum $32.00/sq. ft. $34.00/sq.ft.

Canvas $24.00/sq. ft. $25.00/sq.ft.
67 Fence or Freestanding Wall (over 6" high) Wood or metal $49.00/lf. $52.00/sq.ft.

Masonry $85.00/lf. $90.00/sq.ft.
68 Decks/Balcony $47.00/sq. ft. $50.00/sq.ft.
69 Wood Deck $20.00/sq. ft $21.00/sq.ft.
70 Re-roofs $3.00/sq. ft. $3.00/sq.ft.
71 Retaining Walls $107.00/lf. $113.00/sq.ft.
72 Emergency generation, wind power, special HVAC
systems, etc.

Plan Review (1 hr. minimum)
$152.50/hr. $161.00/hr.

Field Inspection (2 hr. minimum)
$160.00/hr. $169.00/hr.
73 Photovoltaic - Roof & Ground Mounted - Residential Plan Review (1/4 hr. minimum) $152.50/hr. $161.00/hr.

Field Inspection (1 hr. minimum)
$160.00/hr. $169.00/hr.
74 Photovoltaic - Roof & Ground Mounted - Commercial Plan Review (1 hr. minimum) $152.50/hr. $161.00/hr.

Field Inspection (2 hr. minimum)
$160.00/hr. $169.00/hr.
75 Fee for issuing/reinstating an Electrical Permit $55.00 $58.00 76 Additional Electrical Permit Fee $25.00 $26.00
77 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
78 Commercial Construction $.08 sq. ft

Page 211 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 10

DEVELOPMENT SERVICES
Plan Review & Re-inspection Fees
System Fee Schedule
For alterations to existing pools, use Unit Fee Schedule fees listed on page 10.

Unit Fee Schedule
79 Plan review fee 25% of Electrical Permit Fee
80 Additional plan review $152.50/hr. $161.00/hr.
81 Re-inspection fee $160.00/hr. $169.00/hr.
82 Private swimming pools $63.00 $67.00
83 Public swimming pools $114.00 $121.00
84 Temporary power poles $78.00 $83.00
85 Temporary distribution system & temporary lighting $38.00 $40.00 86 Installation of illuminated signs (each) $101.00 $107.00

Page 212 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 11

DEVELOPMENT SERVICES
Unit Fee Schedule (continued)
Other Electrical Fees
87 Receptacle, switch and lights $2.00
88 Residential appliances/new circuits (cook top, oven, range, disposals, clothes dryers, or other motor
operated appliances not exceeding one horsepower)
$6.00
89 Nonresidential appliances/new circuits (medical &
dental devices, food, beverage, drinking fountains,
laundry machines, or other similar equipment) NOTE:
for other types of air conditioners and other motordriven appliances having larger electrical ratings, see Generators/Motors
$8.00
90 Photovoltaic system (residential) $90.00
91 Solar systems (including controls) $90.00
92 Power apparatus (generators, transformers, A/C, heat pumps, baking equipment)
Up to 10 KV, each $16.00 $17.00
Over 10 KV not over 50 KV, each
$32.00 $34.00
Over 50 KV and not over 100 KV, each
$63.00 $67.00
Over 100 KV, each $84.00 $89.00
93 Motors Up to 10 hp $16.00 $17.00
Up to 25 hp $32.00 $34.00
Up to 55 hp $63.00 $67.00
Over 55 hp $92.00 $97.00
94 Transformers Up to 5 KVA $16.00 $17.00
Up to 10 KVA $32.00 $34.00
Up to 50 KVA $53.00 $56.00
Over 50 KVA $77.00 $82.00
95 Busways/conduits (per 100 ft) $8.00
96 Service equipment 200 amps or less $78.00 $83.00
201 to 999 amps $108.00 $114.00
Sub-panels $38.00 $40.00
97 Installation of spas or saunas $38.00 $40.00
98 Duplicate job card $25.00 $26.00
99 Permit extension (applies to permits that have not
expired)
$78.00 $83.00

Page 213 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 12

DEVELOPMENT SERVICES
Mechanical Permit Fees
Plan Review & Re-inspection Fees
Unit Fee Schedule
Other Mechanical Fees
Plumbing Permit Fees
100 Fee for issuing/reinstating a Mechanical Permit $55.00 $58.00 101 Additional Mechanical Permit Fee $25.00 $26.00
102 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
103 Commercial Construction $.08 sq. ft
104 Plan review fee 25% of Mechanical Permit Fee
105 Additional plan review $152.50/hr. $161.00/hr.
106 Re-inspection fee $160.00/hr. $169.00/hr.
107 Installation, of each heating system, A/C, boiler,
compressor or air handler
$38.00 $40.00
108 Each duct repair or alteration $11.00 $12.00
109 Each fireplace appliance $32.00 $34.00
110 Each ventilating fan $11.00 $12.00
111 Installation of separate flue or vents not included with the installation of an appliance
$11.00 $12.00
112 Installation of each hood with mechanical exhaust Residential $32.00 $34.00 Commercial $114.00 $121.00
113 Each new or repair of gas piping system $70.00 $74.00 114 Each additional gas outlet $23.00 $24.00
115 Installation of evaporative cooler $32.00 $34.00
116 Duplicate job card $25.00 $26.00
117 Permit extension (applies to permits that have not
expired)
$78.00 $83.00

Page 214 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 13

DEVELOPMENT SERVICES
Plan Review & Re-inspection Fees
System Fee Schedule
Unit Fee Schedule
Unit Fee Schedule (continued)
Other Plumbing Fees
118 Fee for issuing/reinstating a Plumbing Permit $55.00 $58.00 119 Additional Plumbing Permit Fee $25.00 $26.00
120 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
121 Commercial Construction $.08 sq. ft
122 Plan review fee 25% of Plumbing Permit Fee
123 Additional plan review $152.50/hr. $161.00/hr.
124 Re-inspection fee $160.00/hr. $169.00/hr.
125 Private swimming pools (including heater, water
piping, gas piping)
$92.00 $97.00
126 Public swimming pools (including heater, water
piping, gas piping)
$138.00 $146.00
127 Lawn sprinkler system on one meter $38.00 $40.00
128 Each new or repair of gas piping system $70.00 $74.00 129 Each drainage, sewer system $38.00 $40.00
130 Radiant floor heating system $114.00 $121.00
131 Each plumbing fixture or trap or set of fixtures on one trap
$11.00 $12.00
132 Each sewer cleanout, backflow device $11.00 $12.00
133 Each septic system abatement $114.00 $121.00
134 Rainwater systems - per drain (inside building) $11.00 $12.00 135 Each water heater, water softener $32.00 $34.00
136 Each grease interceptor (750 gallon capacity) $78.00 $83.00 137 Each grease trap (1-4 fixtures) $44.00 $47.00
138 Residential water re-piping $114.00 $121.00
139 Each ejector/sump pump $38.00 $40.00
140 Each vacuum breaker/hose bib $11.00 $12.00
141 Each water piping system repair or replacement $24.00 $25.00 142 Each additional gas outlet $24.00 $25.00

Page 215 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 14

DEVELOPMENT SERVICES
Other Building Fees
State of California Title 24 Part 2 Energy and Accessibility Code and Regulation Plan Review and Inspection Fees
A surcharge shall be added to the building permit fee for the cost to plan review and inspect for compliance with State of California Title 24 Regulations. This fee is calculated at fifteen percent (15%) of the building permit fee. This fee is applied whenever a plan review is assessed.

State of California Mandated Building Standards Fee – SB 1473 A surcharge shall be added to all building permits at the rate of four dollars ($4) per one hundred thousand dollars ($100,000) in valuation, with appropriate fractions thereof, but not less than one dollar ($1). These funds will be available to the California Building Standards Commission, the Department of Housing and Community Development, and the Office of the State Fire Marshall for expenditure in carrying out the provisions of the State Building Standards Law and provisions of State Housing Law that relate to building standards. Up to ten percent (10%) shall be retained for related administrative costs and for code enforcement education.

Planning Division
The fees listed below constitute all fees imposed by the Planning Division. Certain types of applications must be reviewed / processed by other departments/agencies, which may impose separate fees. Applicants are advised that the fees for those services are not included in the Planning Department's fees. Where the term "actual cost" is used here, it shall mean:
materials, supplies (including any costs of noticing or publication), outside consultants, employee cost will be billed at the top step, plus benefits, plus overhead. The following fee 143 Duplicate job card $25.00 $26.00
144 Permit extension (applies to permits that have not
expired)
$78.00 $83.00
145 Duplicate Inspection Card $30.00 $32.00
146 NPDES Inspection Fee (Charged on all building
permits with the potential to generate non-point
source storm water runoff during construction)
$70.00 $74.00

Page 216 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 15

DEVELOPMENT SERVICES
schedule is established for applications filed pursuant to the Town Code. The fees are collected by the Community Development Department at the time the application is filed unless otherwise noted.
• Fees for Additional Processing - In the event additional processing services by the Town are required due to changes, modifications, additions, errors, omissions, or discrepancies caused by the applicant or his/her agents or representatives, the applicant shall pay an additional fee as determined by the Director of Community Development to cover the actual cost.
• Fees for Lack of Progress - If additional information is required by the Town for an application and the requested information is not submitted within 180 days, the applicant will be required to pay a fee of 10 percent of the current application fee at the time the requested information is submitted. Any re-submittal after one year will be processed as a new application, subject to new fees.
• Fees for Major Projects - If it is anticipated that the application processing costs of selected major projects will significantly exceed the following fees, the Director of Community Development may collect a deposit and charge actual time spent to process the applications based upon current hourly rates.
• Surcharges - All of the following applications are subject to the surcharge fees as set forth in General Development Services and in the Zoning Research section of Planning Division.

Zoning Approvals - Architecture and Site Applications – Development Review Committee (DRC) Approval

Page 217 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 16

DEVELOPMENT SERVICES
Zoning Approvals – Architecture and Site Applications – Planning Commission Approval Zoning Approvals – Architecture and Site Applications – Planning Commission Approval (continued)
147 New single family detached (HR and RC zones) $8,978.00 $9,508.00 Engineering Development Review Service Fee $4,151.00 $4,396.00 148 New non-custom single family detached (HR and RC
zones) per unit/model, as part of a Planned
Development**
$6,235.00 $6,603.00
Engineering Development Review Service Fee $4,148.00 $4,393.00 149 New single family or two family units $6,187.00 $6,552.00 Engineering Development Review Service Fee $4,149.00 $4,394.00 150 New single family or two family (any other zone) per unit/model new nonresidential or multiple family per
building as part of a Planned Development**
$4,421.00 $4,682.00
Engineering Development Review Service Fee $4,153.00 $4,398.00 151 Minor projects (a development proposal that does not significantly change the size, mass, appearance or
neighborhood impact of a structure, property or
parking lot
$2,243.00 $2,375.00
Engineering Development Review Service Fee $3,186.00 $3,374.00 152 Supplemental fee DRC applications as determined
with fee #146 or minor residential development
applications or applications that are part of a Planned Development that require Planning Commission
approval
$3,168.00 $3,355.00
Engineering Development Review Service Fee $1,157.00 $1,225.00 153 New two family unit $9,437.00 $9,994.00
Engineering Development Review Service Fee $4,151.00 $4,396.00 154 New nonresidential (includes conceptual Planned
Development elevations)
$10,832.00 $11,471.00
Engineering Development Review Service Fee $4,151.00 $4,396.00 155 New multiple family (includes conceptual Planned
Development elevations)
$9,847.00 $10,428.00
Engineering Development Review Service Fee $4,149.00 $4,394.00

Page 218 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 17

DEVELOPMENT SERVICES
Conditional Use Permits
Rezoning (other than Planned Development)
Planned Development
156 All other (i.e. exceed FAR, major grading, etc.) $5,491.00 $5,815.00 Engineering Development Review Service Fee $4,151.00 $4,396.00 *Aside from the fees noted above, no additional Architecture and Site application fees will be assessed for projects that involve a historic structure or site. **Any changes proposed to model homes, nonresidential, or multiple family buildings, a supplemental fee shall be based on a time and materials basis to review the changes. 157 Conditional Use Permit $6,351.00 $6,726.00
Engineering Development Review Service Fee $1,351.00 $1,431.00 158 Conditional Use Permit (when consolidated with
another application for new development)
$1,056.00 $1,118.00
Engineering Development Review Service Fee $774.00 $820.00 159 Conditional Use Permit for Minor Restaurant (DRC
Approval)
$3,865.00 $4,093.00
Engineering Development Review Service Fee $1,160.00 $1,228.00 160 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 1
$6,351.00 $6,726.00
Engineering Development Review Service Fee $1,736.00 $1,838.00 161 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 2 includes alcohol and/or
entertainment (must pay #159 below with this
application)
$7,506.00 $7,949.00
Engineering Development Review Service Fee $1,735.00 $1,837.00 162 Applications that require Town Council Approval
(these fees supplement the above established fees)
$3,012.00 $3,190.00
Engineering Development Review Service Fee $1,158.00 $1,226.00 Transcription of Planning Commission
minutes - Actual cost and minimum
$500.00 deposit
163 Without General Plan or Specific Plan Amendment Actual Cost ($5,000.00 minimum) 164 With General Plan or Specific Plan Amendment Actual Cost ($7,000.00 minimum) 165 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00 deposit

Page 219 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 18

DEVELOPMENT SERVICES
Planning Division Certificates of Use and Occupancy
Sign Application
Administrative Land Use Permit
Other Zoning Approvals Fees
166 Without General Plan or Specific Plan Amendment Actual Cost 167 Without General Plan or Specific Plan Amendment
(HR or RC Underlying Zone)
Actual Cost
168 With General Plan or Specific Plan Amendment Actual Cost 169 With General Plan or Specific Plan Amendment (HR or RC Underlying Zone)
Actual Cost
170 Town Council Modification to a Planned Development Actual Cost ($5,000.00 minimum) 171 DRC Modification to a Planned Development Actual Cost ($3,000.00 minimum) 172
173 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00 deposit
Publication costs for the planned development ordinance shall be paid by the applicant 174 Change of use $230.00 $244.00
175 Change of occupancy (excluding change of proprietor of a continuing business enterprise)
$155.00 $164.00
176 Use/occupancy clearance if Conditional Use Permit is required or occupancy of a new accessory dwelling
unit
No fee
177 New permanent sign $310.00 $328.00
178 Temporary nonresidential sign $99.00 $105.00
179 Change of face only $155.00 $164.00
180 Sign program $2,075.00 $2,197.00
181 Minor telecommunications facility (i.e. microcell,
8,021 lb. or equivalent)
$1,535.00 $1,626.00
182 Major telecommunications facility which do not
require a Conditional Use Permit
$3,681.00 $3,898.00

Page 220 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 19

DEVELOPMENT SERVICES
Subdivisions
Subdivisions (continued)
183 Variance $4,671.00 $4,947.00
Engineering Development Review Service Fee $1,351.00 $1,431.00 184 Minor Residential Development (see #151) $2,243.00 $2,375.00 185 Agricultural Preserve Withdrawal $3,810.00 $4,035.00 186 Hazardous Materials Storage Facility Application Fully allocated rate of all personnel, plus noticing fees
187 Home Occupation Permit $155.00 $164.00
188 Accessory Dwelling Unit $1,340.00 $1,419.00
189 Two-Unit Housing Development $1,340.00
190 Urban Lot Split $1,340.00
191 Mobile Home Park Conversion Permit Fully allocated rate of all personnel with initial deposit of $5,000.00
192 General Plan/Town Code Amendments Fully allocated rate of all personnel with initial deposit of $5,000.00 plus
additional fees
193 Lot Line Adjustment (DRC Approval) $2,128.00 $2,254.00 Engineering Development Review Service Fee $3,571.00 $3,782.00 194 4 Lots or Less (DRC Approval) $8,575.00 $9,081.00
Engineering Development Review Service Fee $3,960.00 $4,194.00 195 4 Lots or Less (as part of a Planned Development)
(DRC Approval)
$3,541.00 $3,750.00
Engineering Development Review Service Fee $4,153.00 $4,398.00 196 5 Lots or More $9,660.00 $10,230.00
Engineering Development Review Service Fee $5,115.00 $5,417.00 197 5 Lots or More (as part of a Planned Development)
(DRC Approval)
$4,152.00 $4,397.00
Engineering Development Review Service Fee $5,118.00 $5,420.00 198 Vesting Tentative Map (VTM) Actual Cost plus $500.00 deposit and additional fees
199 Lot Merger and Reversion to Acreage (DRC Approval) $1,055.00 $1,117.00 Engineering Development Review Service Fee $3,570.00 $3,781.00 200 Condominium $7,445.00 $7,884.00
201 Condominium (as part of a Planned Development) $3,541.00 $3,750.00 202 Certificate of Compliance (DRC Approval) $3,076.00 $3,257.00 Engineering Development Review Service Fee $2,219.00 $2,350.00

Page 221 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 20

DEVELOPMENT SERVICES
Miscellaneous Application Fees
Environmental Assessment Fees
Environmental Assessment Fees (continued)
203 VTM applications that require Town Council approval, Subdivision and/or DRC applications that require
Planning Commission approval. This fee supplements
the above-established fees.
$2,824.00 $2,991.00
204 Time Extensions to Approved Application 50% of current fee (excluding fees based on actual cost)
205 Modification to Approved Application 75% of current fee (excluding fees based on actual cost)
206 Conceptual Development Advisory Committee Review $2,966.00 Special Noticing - Actual Cost
(minimum $500.00 deposit)
207 Push Cart Permit $492.00 $521.00
208 Auto Dealer Events Smaller Promotional Events $82.00 $87.00
Large Promotional Events $401.00
$425.00
209 News rack Permit Fee $390.00 $413.00
210 Firearms Dealer Permit (Town Ordinance 2217 dated
6/17/2013)
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
211 Categorical Exemption No fee
212 Initial Study Deposit*** Fully allocated hourly rate of all personnel with initial $5,000.00
deposit
213 Draft Initial Study Review Fee (or actual cost if part of a Planned Development, General Plan and/or Town
Code Amendment
$2,786.00 $2,950.00
Engineering Development Review Service Fee $1,931.00 $2,045.00 214 Environmental Impact Report Consultant's fee

Page 222 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 21

DEVELOPMENT SERVICES
Surcharges
Appeals
Zoning Research
215 Draft EIR Review Fee Fully allocated hourly rate of all personnel plus any necessary outside
costs
216 Impact Monitoring Program (AB3180) Fully allocated hourly rate of all personnel plus any necessary outside
costs
***The $5,000 fee is a deposit only. The specific cost of the Initial Study and any required special studies shall be borne by the applicant. The deposit shall be increased before the Town will authorize work exceeding the amount on deposit. Any deposit balance will be refunded. 217 General Plan update surcharge .5% of building valuation for new construction and additions/10% of
zone change and subdivision fee
218 Advanced Planning projects 10% of application fee
219 Administrative Fee 10% of development application fees 220 Fee to appeal Planning Commission decision to Town
Council
Per Residential $438.00 $464.00
Per Commercial, multi-family or
tentative map $1,763.00 $1,867.00
221 Fee to remand applications from Town Council to
Planning Commission
Fully allocated hourly rate for all
personnel plus additional fees
222 Fee to appeal Director of Community Development or
Development Review Committee decision to Planning
Commission
Per Residential $221.00 $234.00
Per Commercial $882.00 $934.00
223 Tree appeals $90.00 $95.00
224 Appeal transcription fee of Planning Commission
minutes (only applies to appeals from Planning
Commission to Town Council)
Actual Cost - minimum $500.00
deposit

Page 223 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 22

DEVELOPMENT SERVICES
Other Planning Division Fees
Payment of Application Fees
All application fees are to be paid at the time the applications are submitted to the Community Development Department. If the applicant withdraws an application, which requires a hearing by the Planning Commission, prior to processing the application for the hearing, 40% of the paid application fee shall be refunded to the applicant at the discretion of the Director of Community Development. All other fees are non-refundable.

Engineering Division
225 Basic Zoning Letter $155.00 $164.00
226 Legal non-conforming verification $650.00 $688.00
227 Reconstruction of legal non-conforming structures
(Burndown Letter)
$276.00 $292.00
228 Fence Height Exceptions $276.00 $292.00
229 Peer/Technical Review - any remaining deposit will
be refunded to the applicant and amounts exceeding
the deposit amount will be paid by applicant
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
230 Fees For Additional Tech Review and/or DRC Review - DRC beyond three meetings, Planning Commission
hearing beyond two meetings, Town Council hearing
beyond one meeting
Fully allocated hourly rate of all
personnel involved plus additional
fees
231 Consultation Actual cost on an hourly basis
232 Research Services Minimum Charge Fully allocated hourly rate for all personnel with initial $200.00 deposit
233 Building Permit Plan Check Fee 20% of building fee
234 Below Market Price Housing Program In-Lieu Fee 6% of the building permit valuation for the entire project
235 Outdoor Seating Permit Fully allocated hourly rate for all personnel with initial $1,000.00
deposit
236 Valet Parking Permit Fully allocated hourly rate for all personnel with initial $1,000.00
deposit
237 Parklet Program Fully allocated hourly rate for all personnel with initial $1,000.00
deposit

Page 224 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 23

DEVELOPMENT SERVICES
The following fees constitute a comprehensive listing of the various fees charged by the Engineering Program. Certain types of application/permits must be reviewed and/or processed by other Town departments or public agencies, which may charge separate fees. Applicants are advised that the fees for those services are not included in the Engineering Program's fees.

Where the term "actual cost (s)" is used here it shall mean: materials, supplies (including any costs of noticing or publication), outside consultants and employee cost, (including salary, benefits and overhead).

Engineering Plan Check Fee (Public Improvements & Grading Permits) * Inspection Fee (Public Improvements & Grading Permits)
Work In or Use of Public Right-of-Way *
238 Application Fee $490.00 $519.00
239 Under $20,000.00 15.5% of valuation
240 $20,000.00 to $80,000.00 $3,100.00 $3,283.00 plus 9% of valuation
241 Greater than $80,000 $8,500.00 $9,002.00 plus 8.5%
valuation
242 Each additional plan check beyond three reviews Fully allocated hourly rate for all personnel
243 Under $20,000.00 7.5% of valuation
244 $20,000.00 to $80,000.00 $1,500.00 $1,589.00 plus 6.5% of valuation
245 Greater than $80,000.00 $5,400.00 $5,719.00 plus 4.0% of valuation

Page 225 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 24

DEVELOPMENT SERVICES
NPDES
Engineering Subdivision Map Checking
246 Encroachment Permit - Residential Work up to $4,000.00 - $305.00 $323.00
Each additional $2,000.00 - $160.00
$169.00
247 Encroachment Permit - Collector/Arterial Streets** Work up to $4,000.00 - $1,580.00 $1,673.00
Each additional $2,000.00 - $345.00
$365.00
248 Outside contractor underground utility locating
surcharge (actual cost for outside contractor
inspection fee may change)
$95.00
249 Temporary Encroachment Permit $150.00 $159.00
250 Dumpster Permit $150.00 $159.00
251 Storage Permit $150.00 $159.00***
* Work done at night or on weekends shall be charged the actual costs of staff ** Single-family residences located along collector and arterial streets to be charged the residential fees above
*** $500.00 refundable Storage Unit Removal Deposit, to cover cost of removal, if abandoned 252 Inspection Fee - Grading Permits Single Family Residential $730.00 $773.00
Commercial or Multi Family
Residential $1,135.00 $1,202.00
253 Inspection Fee - Encroachment Permits and Some
Storage Permits
Single Family Residential $200.00
$212.00
Commercial or Multi Family
Residential $325.00 $344.00
Plus $485.00 $514.00 per LID facility
254 Inspection of Storm Water Treatment Measures $500.00 $530.00 per facility 255 Annual Stormwater/Limited Impact Development (LID)
Permit
Per Visit and 1st facility inspection
$485.00 $514.00
Every additional facility inspection
$160.00 $169.00
256 C-3 Permit Hydrologic Calculation Fully allocated hourly rate for all personnel plus any outside cost and
initial deposit of $3,750.00

Page 226 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 25

DEVELOPMENT SERVICES
Traffic Impact Analysis or Parking Study
Storm Drainage Fees
Street Improvement In-Lieu Fee
257 1-4 lots $2,855.00 $3,023.00*
258 5 or more lots $3,995.00 $4,231.00*
*Plus, initial $3,000 surveyor deposit. Additional deposit(s) of actual surveyor costs may be required for larger projects than 5 or more lots, additional map check review(s), or overall complexity of the map.
259 Development Review (staff traffic impact analysis or Parking Study)
Actual Cost
Consultant Report - Consultant Fee
260 Staff Review Fee $664.00 $703.00 plus 10% of the
traffic consultant report cost
261 Site Distance Analysis $178.00 $189.00 per review not to exceed two hours. Actual cost for
staff time when analysis exceeds two
hours.
262 Traffic Impact Mitigation Fee $958.00 $1,015.00 per new average daily trip generated
263 Development Projects Single family lots Section

24.60.035(b) (3): For subdivision
whose lots exceed one acre, the fee
shall not exceed that of one acre per
lot $4,228.00 $4,477.00/ac.

Multiple family dwelling units - initial
unit $4,228.00 $4,477.00/ac.

Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $159.00 $168.00
Commercial, industrial, hospitals,
churches, schools, and others
$5,286.00 $5,598.00/ac.
264 Building/Grading Permits (Building, Structures, &
impervious areas)
New impervious surface area, per sq.
ft. $1.00/sq. ft.

Page 227 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 26

DEVELOPMENT SERVICES
Other In-Lieu Fee
Hauling Permits
Construction Activities Mitigation Fee (Ordinance 2189) Other Engineering Fees
Other Engineering Fees (continued)
265 Sidewalks $16.00/sq. ft. $20.00/sq.ft.
266 Curb and Gutter $68.00/lf. $100.00/lf.
267 Trail Improvements $16.00/per sq. ft. or determined by Director
268 House Moving Fee $3,490.00 $3,696.00*
269 Hauling (Overweight Vehicle) Permit Daily $16.00**
Annual $90.00
*Plus initial deposit of $5,000 for facilities damage
**The current State mandated fee is $16.00 for Hauling Permit. If the State fee changes, the Hauling Permit fee will change to reflect the same.
270 New Buildings and Additions Residential (per square foot added) $1.17/sq.ft. $1.26/sq.ft.*
Non-residential (per square foot
added) $1.17/sq.ft. $1.26/sq.ft.*
*These two fees are adjusted based on the Building Cost Index 271 Engineering Reversion to Acreage $2,395.00 $2,536.00 plus initial deposit of $2,500 for surveyor
272 Engineering Lot Merger $3,480.00 $3,685.00 plus surveyor deposit
273 Engineering Lot Line Adjustments $3,480.00 $3,685.00 plus surveyor deposit
274 Certificate of Compliance $3,480.00 $3,685.00 plus surveyor deposit
275 Abandon Excess Public Right-of-Way & Public
Easement
$4,345.00 $4,601.00 plus surveyor
and valuation consultant and
planning services

Page 228 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 27

DEVELOPMENT SERVICES
276 Geotechnical Peer Review Fees Fully allocated hourly rate of all personnel plus any outside costs and
initial $2,500 deposit. Larger projects
require an initial deposit of $4,500 to
allow for a site visit by the
geotechnical peer review consultant.
277 Separate Instrument Dedication Fee (for dedication
via grant deeds and not maps)
$720.00 $762.00 plus initial deposit
of $2,500 for surveyor
278 Slurry Seal Fee $2.50 per sq.ft.
279 Flood Review Fee Consultant Cost plus 25% Admin Fee 280 Miscellaneous Review Fee* Actual Cost
*This fee will be implemented for services including, but not limited to, wet weather inspections, annual inspections, review of operations and maintenance reports, coordination with property owner(s) and/or homeowner associations, etc.

Page 229 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 27

LIBRARY SERVICES
Lost or Damaged Items
In lieu of above, account holder may replace lost/damage item with new identical copy plus $2.00 processing fee.

Internet printing and copies
History Project Digital Image
1 Replacement of Adult book/AV item Cost of item plus $10.00 processing fee
2 Replacement of Teen/Children’s book/AV item Cost of item plus $5.00 processing fee
3 Replacement of Adult paperback Cost of item plus $5.00 processing fee
4 Replacement of magazine Cost of item plus $5.00 processing fee
5 Printing per page - Black and White Copies $0.15
6 Printing per page - Color Copies $0.25
7 Fair Use Fees (for personal use only) Free – Downloaded via History Website
8 Commercial Use Fees $25.00 per high resolution image

Page 230 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 28

PARKS AND PUBLIC WORKS SERVICES
Parks Division
Oak Meadow Park
Picnic Areas (1 through 9)
Bandstand/Gazebo
Minimum two-hour reservation required.

Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only. 1 Facility Fee Resident $95.00 per site
Non-Resident $150.00 per site
2 Facility fee w/Jump House Permit Resident $190.00 per site Non-Resident $300.00 per site
3 Non-Profit Event Resident $65.00 per hour
Non-Resident $120.00 per hour
4 Public Event Resident $95.00 per hour
Non-Resident $150.00 per hour
5 Deposit (refundable) $500.00
6 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
7 Deposit (refundable) $100.00
8 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
9 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
10 Deposit (refundable) $100.00

Page 231 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 29

PARKS AND PUBLIC WORKS SERVICES
Other Oak Meadow Park Fees
Creekside Sports Park
Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only.

Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor (Groups of 25+ and/or Jump House) Single Use Permit
11 Bocce Ball Court Fee Resident $95.00 per day
Non-Resident $150.00 per day
12 Parking Fee Resident No Charge
Non-Resident $6.00 per vehicle
13 Vehicle Escort Fee Resident $75.00
Non-Resident $100.00
14 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
15 Deposit (refundable) $500.00
16 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
17 Additional Day Resident $55.00 per additional day
Non-Resident $75.00 per additional
day
18 Deposit (refundable) $500.00
19 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
20 Deposit (refundable) $100.00

Page 232 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 30

PARKS AND PUBLIC WORKS SERVICES
Multi-Use Permit
Multi-Use Permit for recreational/educational purposes only.

Town Plaza Use Permit
A permit fee is $55.00 per hour for events that close the Town Plaza entirely to the public. This fee will be charged for the number of hours the Town Plaza cannot be used safely by the public due to the event. Additional fees or deposits may be charged for lawn repair, street closures, and/or additional maintenance, as determined by the Parks and Public Works Director and/or Maintenance Superintendent.

Civic Center Lawn Use Permit
A permit fee is $55.00 per hour for events that restrict the use of the Civic Center Lawn.

Additional fees or deposits may be charged for lawn repair, street closures, and/or additional maintenance, as determined by the Parks and Public Works Director and/or Maintenance Superintendent.

Turf Maintenance Fee
Additional fee added to any Park Use or Special Event Permit, when a permit's scheduled activity or event will negatively impact the park turf, (locations including but not limited to Oak Meadow, Town Plaza, and Civic Center lawn areas). The fee amount is to be based upon best estimate of turf repair cost, as determined by the Director of Parks and Public Works and/or Maintenance Superintendent.
21 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
22 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
23 Deposit (refundable) $100.00

Page 233 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 31

PARKS AND PUBLIC WORKS SERVICES
Tree Related Fees
Equipment Hourly Rates as Follows
24 Tree Removal Permit Application* One Tree $250.00
Additional Tree $125.00/each
If application is denied 50% refund
25 Illegal Tree Removal Administrative Fee $330.00
26 Replacement Trees - Town Forestry Fund Per Tree
Ordinance Section 29.10.0985
Tree cost for each 24”,36", and/or
48" box size will be the Market Price
plus the installation cost, determined
by the Director
*Fee will be waived if tree removal is done to implement or maintain Defensible Space. 27 Pick-up Truck $32.00
28 1 Ton Flatbed Truck $42.00
29 Utility Truck $57.00
30 Dump Truck (10 Wheel) $85.00
31 Dump Truck (Bobtail) $63.00
32 Paint Truck $85.00
33 Line Remover $26.00
34 Tractor Loader $63.00
35 Backhoe $85.00
36 Rubber-tired Loader $85.00
37 Roller $63.00
38 Van $37.00
39 Concrete Saw $32.00
40 Air Compressor $32.00
41 Arrowboard $32.00
42 Generator $26.00
43 Chainsaw $20.00
44 Blower $10.00
45 Paving Box $63.00
46 Rodder $63.00
47 High Pressure Sewer Cleaner $117.00
48 Brush Chipper $42.00
49 Chipper Truck $63.00
50 Aerial Unit $92.00
51 Street Sweeper $92.00
52 Forklift $42.00
53 Trailer $42.00
54 Message Board $10.81
55 Barricades $0.23

Page 234 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 32

PARKS AND PUBLIC WORKS SERVICES
Equipment Hourly Rates as Follows (continued)
Streets Division
Hazard and/or Debris Removal
Special Events Fees
Electric Vehicle Charging Fee
56 Cones $0.15
57 Portable Generators $28.04
58 Staff time spent to conduct hazard and or debris
removal caused by citizen negligence
Fully allocated hourly rate of all
personnel plus any outside costs
59 Staff and equipment for special event requests Fully allocated hourly rate of all personnel
60 System Connection Fee $1.00
61 Hourly Charge - 1- 4 hours $1.00/hour
62 Hourly Charge - after 4 hours $5.00/hour

Page 235 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 33

POLICE SERVICES
Printing and Copying Charges
Photographs
Concealed Weapons
Tow Trucks
Massage Permit Fees
Fee covers staff time to process application, review pertinent documents, arrange for fingerprints and photographs to be taken and obtain all necessary approvals.

Special Events
Other Special Police Services – Pursuant to Agreement between Police Chief and Requestor. 1 8 1/2" x 11 and 8 1/2" x 14 $.25 per page
2 Copy - Digital $10.00 per device
3 For the first 3 $42.00
4 Each Additional $13.00
5 Permit Fee, DOJ Fee, and Admin Fee $100.00
6 Renewal Permit $25.00
7 Amended Permit $10.00
8 Tow Permit $95.00
9 Driver Permit $370.00
10 Initial Application for each Therapist $213.00
11 Annual Renewal for each Therapist $107.00
12 Massage Establishment Permit (initial and
subsequent renewals) (Ord 14.110.075)
$415.00
13 ABC Application No charge
14 No Parking Signs $0.46/each
15 Officer Staffing Fully allocated hourly rate of all
personnel
16 Bingo Permit $170.00

Page 236 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 34

POLICE SERVICES
Motion Picture/Television/Commerical Still Photo
Emergency Response Caused By
Alarm Fees
Citation issued for failure to display appropriate Permit or placard. Dismissal fee in lieu of full Bail Amount
Parking Permit Fees
Residential Parking Permit
17 For-Profit Groups (each) $1,609.00
18 Non-For-profit Groups (each) $579.00
19 DUI Emergency Accident Response (Government
Code Section 53155)
Actual costs incurred up to
$12,000.00
20 Second Response due to Disturbances At current billing rate 21 Commercial Alarm Registration Fee $95.00
22 Second False Alarm* $170.00
23 Third False Alarm* $170.00
24 Fourth False Alarm* $170.00
25 Fifth False Alarm* No response, no charge, at the
Chief’s discretion
*Within a six-month period within a calendar year
26 Handicap CVC22507.8/22500(1) $37.00
27 Parking Permits $10.00
28 Annual residential parking permit/per vehicle (Limit 4 per residence)
$42.00
29 Visitor guest passes Two (2) complimentary with the
purchase of the primary permit
30 Special Event Permit -First permit (one day) $10.00
31 Special Event Permit -Each Additional (one day) $2.00 32 Replacement permit for vehicle change (within
calendar year)
$10.00
33 Lost permit replacement $37.00
34 Damaged permit replacement (with return of permit) $18.00

Page 237 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 35

POLICE SERVICES
Parking Permit Fees (continued)
Business Parking Permit
Construction Parking Permit
Other Police Fees
35 Standard Employee annual $248.00
36 Lost permit replacement $37.00
37 Damaged permit replacement (with return of permit) $18.00 38 One day parking permit per construction vehicle $32.00 39 Each additional day per vehicle $5.00
40 Fingerprinting - per each Livescan application (Plus additional DOJ or FBI fees which are based on the
level of service for the application) Fingerprint fees
are subject to increase based on DOJ or FBI fees
$80.00
41 Subpoena Duces Tecum Per California Evidence Code Section 1563
42 Solicitor/Peddler's Permit $55.00 plus fingerprinting 43 Bicycle Licenses (each) $3.00
44 Taxicabs Permit $185.00 per business
45 Clearance Letter $25.00
46 Horse Drawn Vehicle Permit $270.00
47 Firearms Storage Fee $245.00 Admin Fee plus $1.00 per firearm per day for storage
48 Vehicle Release $235.00
49 Vehicle Repossession Release Fee (Government Code
Section 41612)
$15.00
50 Non-Los Gatos Cite Sign Off $27.00
51 Feral Cat Feeder/Trap Permit $42.00

Page 238 ends
Page 239 ends

RESOLUTION 2022-

RESOLUTION OF THE TOWN COUNCIL

OF THE TOWN OF LOS GATOS

CONTINUING DEPARTMENT FEES, RATES, AND CHARGES, AND AMENDING CERTAIN FEES, RATE, AND CHARGES FOR FY 2022/23
WHEREAS, The Town of Los Gatos follows best municipal financial practices that require the Town to establish and maintain all user charges and fees based on the cost of providing services; and
WHEREAS, the last update of the Town of Los Gatos Comprehensive Fee Schedule was adopted on March 19, 2019; and
WHEREAS, those fees currently in effect will remain in effect without interruption, certain of these shall be increased, and certain new services shall have fees.

NOW, THEREFORE, THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES HEREBY RESOLVE:

1. That Resolution 2019-010, “Resolution of the Town Council of the Town of Los Gatos Continuing Department Fees, Rates, and Charges, and Amending Certain Fees, Rates, and Charges for FY 2019/20” is hereby rescinded; and

2. The Town of Los Gatos Comprehensive Fee Schedule, attached hereto as Exhibit AScenario 3, shall become effective July 1, 2022.

ATTACHMENT 3

Page 240 ends

PASSED AND ADOPTED at a regular meeting of the Town Council held on the 15th day of March 2022 by the following vote:

COUNCIL MEMBERS:

AYES:

NAYS:

ABSENT:

ABSTAIN:

SIGNED:

MAYOR OF THE TOWN OF LOS GATOS

LOS GATOS, CALIFORNIA
DATE: __________________
ATTEST:

TOWN CLERK OF THE TOWN OF LOS GATOS

LOS GATOS, CALIFORNIA
DATE: __________________

Page 241 ends

C A L I F O R N I A
Tow n o f L o s G ato s
Comprehensive Fee Schedule (Redlined)
Fiscal Year 2022/23
ATTACHMENT 3, EXHIBIT A

Page 242 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule

TOWN OF LOS GATOS FEE SCHEDULE
The following Fee Schedule is effective July 1, 2022 through June 30, 2023, unless updated by the Town Council. The Fee Schedule will be adjusted annually by the average Consumer Price Index (Bureau of Labor Statistics, U.S. Department of Labor for the San Francisco/Oakland/San Jose Metropolitan Statistical Area) for the calendar year and/or by the percentage increase in actual operating costs for the current year – whichever is greater. The average increase in the CPI for 2019, 2020, and 2021, was 3.2%, 1.7% , and 3.4% respectively, for a cumulative cost of living increase of 8.5% since 2019. Fees are adjusted with a full recovery at 8.5% CPI. This Fee Schedule also provides for minimum annual adjustments for those fees that are directly related to personnel costs. Other adjustments may be made to maintain consistency with the surrounding municipalities within the Town of Los Gatos region but in no case are fees charged in excess of service delivery costs.

Page 243 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule

TABLE OF CONTENTS
Administrative Services......................................................................................................... 1 Attorney Services.................................................................................................................. 3 Development Services
General Development Fees ............................................................................................................ 4 Building Division Fees ..................................................................................................................... 6 Building Permit Fees....................................................................................................................... 6 Electrical Permit Fees...................................................................................................................... 9 Mechanical Permit Fees................................................................................................................ 11 Plumbing Permit Fees................................................................................................................... 12 Other Fees..................................................................................................................................... 13 Planning Division Fees......................................................................................................……………14 Zoning Approvals .......................................................................................................................... 15 Subdivisions .................................................................................................................................. 18 Miscellaneous Application Fees.................................................................................................... 19 Environmental Assessment Fees.................................................................................................. 19 Other Fees..................................................................................................................................... 21 Engineering Division Fees............................................................................................................. 22 Library Services ................................................................................................................... 27 Parks and Public Works Services
Parks Division Fees........................................................................................................................ 28 Oak Meadow Park Fees ................................................................................................................ 28 Creekside Sports Park Fees........................................................................................................... 29 Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor Park Fees......................................... 29 Town Plaza Use Permit ................................................................................................................. 30 Turf Maintenance Fee................................................................................................................... 30 Tree Related Fees.......................................................................................................................... 31 Equipment Hourly Rates............................................................................................................... 31 Street Division Fees....................................................................................................................... 32 Police Services..................................................................................................................... 33 Parking Permit Fees...................................................................................................................... 34

Page 244 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 1

ADMINISTRATIVE SERVICES
Town Facilities Use
Town approved non-profit fundraising activities are allowed in/on Town facilities with an appropriate permit, or license issued by the Town, or provided in an agreement or Conditional Use Permit with the Town. Private events are not allowed in the Council Chambers with the exception of approved events hosted by the tenants of 106 and 108 East Main Street as stated in tenant lease agreements. The available Town facilities are listed below:
• Civic Center Lawn, Deck and Stairs
• Civic Center West Patio
• Council Chambers
• Council Chambers Lobby (as a stand-alone facility)
• Civic Facilities Conference and Meeting Rooms
Copy and Printing Charges
Special Events
1 Fee for Town Hall Facilities Use Non Profit: $0.00 per hour 2 Building Attendant $20.00 per hour
3 Copy of Town Code Actual Cost
4 8 1/2 x 11 and 8 1/2 x 14 $.25 per page
5 11 x 17 $.35 per page
6 Oversized or Large Productions Actual Cost
7 Annual Subscription for Town Code Supplements Actual Cost 8 Copying of Zoning Ordinance Actual Cost
9 Annual Subscription for Zoning Ordinance
Supplements Actual Cost
10 Certification of Town Records $2.00
11 Annual Financial Report Actual Cost
12 Annual Budget Actual Cost
13 Capital Improvement Plan Actual Cost
14 Special Event Application Fee, For-Profit New Event $910.00 Repeat Event $680.00
15 Special Event Application Fee, Not-For Profit New Event $227.00 Repeat Event $170.00
16 Special Event Road Closure Review Fee $225.00
17 Block Party Permit $55.00

Page 245 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 2

ADMINISTRATIVE SERVICES
Business License
Other Services
18 Business License Processing Fee - New Out of Town $20.00 In Town $40.00
19 Business License Processing Fee - Renewal Out of Town and In Town $30.00 20 Compact Disk or Tape of Council and Planning
Commission Meetings (plus actual mailing costs, if
applicable)
$20.00 per DVD for meetings under 2
hours
$30.00 per DVD for meetings over 3
hours
21 Copy - Digital $10 per device
22 Initial Returned Check Fee $25.00
23 Subsequent Return Check Fees [CA Civil Code Section
1719(a) (1)] $35.00
24 Election Filing Fee $25.00
25 Credit Card Processing Fee for all transactions above $30.00 2.40%
26 Request for Service Not Covered by any Other Fee
Fully allocated hourly rates for all
personnel

Page 246 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 3

ATTORNEY SERVICES
1 Conditions, Covenants & Restrictions (CC&R) Review
and Approval
Fully allocated hourly rates for all
personnel
2 Simple Covenant/Deed Restriction Fully allocated hourly rates for all personnel
3 Subdivision Improvement Agreements Fully allocated hourly rates for all personnel
4 Encroachment Agreements Fully allocated hourly rates for all personnel
5 Miscellaneous (Legal Agreements, Real Property, etc.) Fully allocated hourly rates for all personnel

Page 247 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 4

DEVELOPMENT SERVICES
General Development Fees
Reports, Agendas, and Minutes
1 Reproduction (sent out) plus actual mailing costs, as applicable. Maps, plans, etc. (larger than 11" x 17")
Actual Cost - sent to San Jose
Blueprint
2 Data Duplication service and fee for partial or full
copies of each digital standard Town data file on onetime request basis. 8 1/2" x 11" copy, standard $.25 per page
3 Document Storage Fee - Laserfiche Actual Cost
4 Duplicate Plans Set $154.00/hr. (1/2 hr. minimum)
5 Research Records Charge for Staff Research beyond
30 minutes
Fully allocated hourly rate for all
personnel
6 Address Processing Fee - per address $160.00 $174.00
7 Computer Surcharge on all
Building/Plumbing/Mechanical/Electrical/Grading/En
croachment/Planning Permits/Applications and any
other Permits/ Applications except Park
Permit/Applications
4% of development application fee
8 Engineering Development Review Service Fee -
Building Permit and Building Plan Check*
5% of permit or plan check
9 Request for Service Not Covered by Any Other Fee Actual Cost 10 Pre-application Conference Fee Courtesy meeting
11 Applications for Work Unlawfully Completed Double current application fee 12 BMP Document Processing Fee $575.00 $624.00
13 Community Benefit No standard schedule, as offered and applied per project
13 Public Art In-Lieu Fee 1% of building permit valuation *These fees are applied to permits or plan checks that require engineering services. 14 Development Review Committee Agendas $37.00
15 Planning Commission Agendas $25.00
16 Planning Commission Minutes Actual Cost
17 Plan Copies - microfiche or other reprints sent to an outside firm
$31.00 plus costs
18 Plan Copies - blueprint reproduction in house $3.00 per page 19 Copy of Subdivision Ordinance $26.00
20 General Plan (including maps) $26.00
21 Hillside Specific Plan $5.80
22 Hillside Development Standards and Design
Guidelines
$19.45

Page 248 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 5

DEVELOPMENT SERVICES
Reports, Agendas, and Minutes (continued)
Landscape
Final occupancy clearance (new construction or remodel) Basis:

Development Review Committee Meetings – 1.5 hrs. (estimate) Site Visits – 4.0 hrs. (estimate)
Review Plan – 4.0 hrs. (estimate)
*Note: Time spent over and above the initial application fee will be billed at the current employee billing rate plus equipment hourly rate.

Annexation Fees
Any remaining deposit will be refunded to the applicant and amounts exceeding the deposit amount will be paid by applicant.
23 Commercial Design Guidelines $20.50
24 Subdivision Ordinance $26.00
25 General Plan/Zoning Maps (24" x 36") - Black & White $9.00 26 General Plan/Zoning Maps (24" x 36") - Color $42.00
27 Blossom Hill Open Space Study $14.00
28 Commercial Specific Plan Report $12.00
29 Residential Design Guidelines $21.50
30 Housing Element Technical Appendix $24.75
31 2015-2023 Housing Element $39.00
32 Los Gatos Boulevard Plan $9.50
33 North Forty Specific Plan (adopted June 2015) $45.25 34 Park Staff Time Spent for Major Development
Applications
$543.00*
35 1 Lot $3,010.00 $3,266.00*
36 2 Lots $1,505.00 $1,633.00*
37 3 Lots $1,005.00 $1,090.00*
38 4 Lots $755.00 $819.00*
39 5 Lot or more $600.00 $651.00*
*Annexation Advertising Deposit (varies as to size of map) - $1,000.00 to $2,200.00

Page 249 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 6

DEVELOPMENT SERVICES
Seismic Hazards Mapping Program Fee (SMIP)
For residential construction of three stories and less (Category 1), the permit fee is $13.00 per $100,000. For all other construction (Category 2), the permit fee is $28.00 per $100,000. This fee is required by the State of California to identify and map zones of particular seismic hazards.

Five percent of the fee is retained by the Town to be used solely for earthquake preparedness.

Capital Improvement Tax (Construction)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area of an existing building.

Underground Utility Tax (Utilities)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area of existing building.

Park Fund Tax (Parks)
Based on $0.04 for each square foot of building addition or alteration, which increases floor area of an existing building.

Building Division
Building Permit Fees
Building Permit Fees for New Construction and Addition
The fee for each building permit shall be based upon the 1997 Uniform Building Code as amended by the 2010 California Building Code.

A building valuation regional modifier of 2.32 shall be used in conjunction with the Building Valuation Data provided in the publication, Building Valuation Data, published by the International Code Council – February 2012. Hillside Homes shall use a modifier of 3.246 and Commercial Office Tenant Improvements shall use a modifier of 1.16. The Building Valuation Data will be increased yearly by the Engineering News Record (ENR) Annual Building Cost Index (BCI) for every year thereafter.
40 Fee for issuing/reinstating a Building Permit $55.00 $60.00 41 Additional Building Permit Fee $30.00 $33.00
42 Demolition Permit Residential: $265.00 $288.00
Commercial: $465.00 $505.00

Page 250 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 7

DEVELOPMENT SERVICES
Building Permit Fees for New Construction and Addition
Total Valuation Fee
43 $1.00 to $500.00 $32.99 $36.00
44 $501.00 to $2,000.00 $32.99 $36.00 for the first $500.00 plus $4.28 $4.64 for each additional
$100.00 or fraction thereof, to and
including $2,000.00
45 $2,001.00 to $25,000.00
$97.23 $105.00 for the first $2,000.00
plus $19.66 $21.33 for each
additional $1,000.00 or fraction
thereof, to and including $25,000.00
46 $25,001.00 to $50,000.00
$549.32 $596.00 for the first
$25,000.00 plus $14.18 $15.39 for
each additional $1,000.00 or fraction
thereof, to and including $50,000.00
47 $50,001.00 to $100,000.00
$903.83 $981.00 for the first
$50,000.00 plus $9.83 $10.67 for
each additional $1,000.00 or fraction
thereof, to and including $100,000.00
48 $100,001.00 to $500,000.00 $1,395.23 $1,514.00 for the first $100,000.00 plus $7.86 $8.53 for
each additional $1,000.00 or fraction
thereof, to and including $500,000.00
49 $500,001.00 to $1,000,000.00 $4,540.19 $4,926.00 for the first $500,000.00 plus $6.67 $7.24 for
each additional $1,000.00 or fraction
thereof, to and including
$1,000,000.00
50 $1,000,001.00 and over $7,874.69 $8,544.00 for the first $1,000,000.00 plus $4.42 $4.80 for
each additional $1,000.00 or fraction
thereof

Page 251 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 8

DEVELOPMENT SERVICES
Building Permit Fees for Remodels, Alterations, and Repairs The Building Official shall establish the valuation of said improvements, and fees will be assessed as per Valuation Schedule above.

Special Services & Inspections
Plan Review Fee
A plan review fee shall be charged at the time of filing application. This fee is separate from and shall be in addition to the building permit fee. This fee is calculated at sixty-five percent (65%) of the building permit fee as per the valuation schedule starting on page 6.

Other Miscellaneous Factors to Determine Construction Valuation 51 Inspection outside normal business hours (4 hr.
minimum)
$192.00/hr. $208.00/hr.
52 Re-inspection fees $160.00/hr. $174.00/hr.
53 Inspections for which no fee is specifically indicated (2 hr. minimum)
$160.00/hr. $174.00/hr.
54 Additional plan review required by changes, additions or revisions to plans (1 hr. minimum)
$152.50/hr. $165.00/hr
55 For use of outside consultants for plan checking
and/or inspections Actual Cost
56 Services for which no fee is specifically indicated (1/2 hr. minimum)
$160.00/hr. $174.00/hr.
57 Permit/Plan check time extension (per permit)
(applies to permits that have not expired)
$78.00 $85.00
58 Express plan review or initial review (1 hr. minimum) $160.00/hr. $174.00/hr. 59 Application for the Appeals Building Board Review $273.00 $296.00 60 Temporary Certificate of Occupancy $1,095.00 $1,188.00 61 Convert Garage to habitable space $117.00/sq. ft. $127.00/sq.ft. 62 Convert unfinished basement or attic to habitable $127.00/sq. ft. $138.00/sq.ft. 63 Pools/Spas (gunite) $76.00/sq. ft. $82.00/sq.ft.
64 Siding - aluminum/vinyl/wood $32.00/sq. ft. $35.00/sq.ft. 65 Antennas & Towers Const.Value As Applied under
valuation schedule on page 6
66 Commercial Awning or Canopy Aluminum $32.00/sq. ft. $35.00/sq.ft.

Canvas $24.00/sq. ft. $26.00/sq.ft.

Page 252 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 9

DEVELOPMENT SERVICES
Other Miscellaneous Factors to Determine Construction Valuation (continued) Special Systems Fees
Electrical Permit Fees
Plan Review & Re-inspection Fees
67 Fence or Freestanding Wall (over 6" high) Wood or metal $49.00/lf. $53.00/sq.ft.

Masonry $85.00/lf. $92.00/sq.ft.
68 Decks/Balcony $47.00/sq. ft. $51.00/sq.ft.
69 Wood Deck $20.00/sq. ft $22.00/sq.ft.
70 Re-roofs $3.00/sq. ft. $3.00/sq.ft.
71 Retaining Walls $107.00/lf. $116.00/sq.ft.
72 Emergency generation, wind power, special HVAC
systems, etc.

Plan Review (1 hr. minimum)
$152.50/hr. $165.00/hr.

Field Inspection (2 hr. minimum)
$160.00/hr. $174.00/hr.
73 Photovoltaic - Roof & Ground Mounted - Residential Plan Review (1/4 hr. minimum) $152.50/hr. $165.00/hr.

Field Inspection (1 hr. minimum)
$160.00/hr. $174.00/hr.
74 Photovoltaic - Roof & Ground Mounted - Commercial Plan Review (1 hr. minimum) $152.50/hr. $165.00/hr.

Field Inspection (2 hr. minimum)
$160.00/hr. $174.00/hr.
75 Fee for issuing/reinstating an Electrical Permit $55.00 $60.00 76 Additional Electrical Permit Fee $25.00 $27.00
77 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
78 Commercial Construction $.08 sq. ft
79 Plan review fee 25% of Electrical Permit Fee
80 Additional plan review $152.50/hr. $165.00/hr.
81 Re-inspection fee $160.00/hr. $174.00/hr.

Page 253 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 10

DEVELOPMENT SERVICES
System Fee Schedule
For alterations to existing pools, use Unit Fee Schedule fees listed on page 10.

Unit Fee Schedule
82 Private swimming pools $63.00 $68.00
83 Public swimming pools $114.00 $124.00
84 Temporary power poles $78.00 $85.00
85 Temporary distribution system & temporary lighting $38.00 $41.00 86 Installation of illuminated signs (each) $101.00 $110.00 87 Receptacle, switch and lights $2.00 $2.00
88 Residential appliances/new circuits (cook top, oven, range, disposals, clothes dryers, or other motor
operated appliances not exceeding one horsepower)
$6.00 $7.00
89 Nonresidential appliances/new circuits (medical &
dental devices, food, beverage, drinking fountains,
laundry machines, or other similar equipment) NOTE:
for other types of air conditioners and other motordriven appliances having larger electrical ratings, see Generators/Motors
$8.00 $9.00
90 Photovoltaic system (residential) $90.00
91 Solar systems (including controls) $90.00
92 Power apparatus (generators, transformers, A/C, heat pumps, baking equipment)
Up to 10 KV, each $16.00 $17.00
Over 10 KV not over 50 KV, each
$32.00 $35.00
Over 50 KV and not over 100 KV, each
$63.00 $68.00
Over 100 KV, each $84.00 $91.00
93 Motors Up to 10 hp $16.00 $17.00
Up to 25 hp $32.00 $35.00
Up to 55 hp $63.00 $68.00
Over 55 hp $92.00 $100.00
94 Transformers Up to 5 KVA $16.00 $17.00
Up to 10 KVA $32.00 $35.00
Up to 50 KVA $53.00 $58.00
Over 50 KVA $77.00 $84.00
95 Busways/conduits (per 100 ft) $8.00 $9.00

Page 254 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 11

DEVELOPMENT SERVICES
Unit Fee Schedule (continued)
Other Electrical Fees
Mechanical Permit Fees
Plan Review & Re-inspection Fees
Unit Fee Schedule
96 Service equipment 200 amps or less $78.00 $85.00
201 to 999 amps $108.00 $117.00
Sub-panels $38.00 $41.00
97 Installation of spas or saunas $38.00 $41.00
98 Duplicate job card $25.00 $27.00
99 Permit extension (applies to permits that have not
expired)
$78.00 $85.00
100 Fee for issuing/reinstating a Mechanical Permit $55.00 $60.00 101 Additional Mechanical Permit Fee $25.00 $27.00
102 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
103 Commercial Construction $.08 sq. ft
104 Plan review fee 25% of Mechanical Permit Fee
105 Additional plan review $152.50/hr. $165.00/hr.
106 Re-inspection fee $160.00/hr. $174.00/hr.
107 Installation, of each heating system, A/C, boiler,
compressor or air handler
$38.00 $41.00
108 Each duct repair or alteration $11.00 $12.00
109 Each fireplace appliance $32.00 $35.00
110 Each ventilating fan $11.00 $12.00
111 Installation of separate flue or vents not included with the installation of an appliance
$11.00 $12.00
112 Installation of each hood with mechanical exhaust Residential $32.00 $35.00 Commercial $114.00 $124.00
113 Each new or repair of gas piping system $70.00 $76.00 114 Each additional gas outlet $23.00 $25.00
115 Installation of evaporative cooler $32.00 $35.00

Page 255 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 12

DEVELOPMENT SERVICES
Other Mechanical Fees
Plumbing Permit Fees
Plan Review & Re-inspection Fees
System Fee Schedule
Unit Fee Schedule
116 Duplicate job card $25.00 $27.00
117 Permit extension (applies to permits that have not
expired)
$78.00 $85.00
118 Fee for issuing/reinstating a Plumbing Permit $55.00 $60.00 119 Additional Plumbing Permit Fee $25.00 $27.00
120 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
121 Commercial Construction $.08 sq. ft
122 Plan review fee 25% of Plumbing Permit Fee
123 Additional plan review $152.50/hr. $165.00/hr.
124 Re-inspection fee $160.00/hr. $174.00/hr.
125 Private swimming pools (including heater, water
piping, gas piping)
$92.00 $100.00
126 Public swimming pools (including heater, water
piping, gas piping)
$138.00 $150.00
127 Lawn sprinkler system on one meter $38.00 $41.00
128 Each new or repair of gas piping system $70.00 $76.00 129 Each drainage, sewer system $38.00 $41.00
130 Radiant floor heating system $114.00 $124.00
131 Each plumbing fixture or trap or set of fixtures on one trap
$11.00 $12.00
132 Each sewer cleanout, backflow device $11.00 $12.00
133 Each septic system abatement $114.00 $124.00
134 Rainwater systems - per drain (inside building) $11.00 $12.00 135 Each water heater, water softener $32.00 $35.00
136 Each grease interceptor (750 gallon capacity) $78.00 $85.00 137 Each grease trap (1-4 fixtures) $44.00 $48.00
138 Residential water re-piping $114.00 $124.00

Page 256 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 13

DEVELOPMENT SERVICES
Unit Fee Schedule (continued)
Other Plumbing Fees
Other Building Fees
State of California Title 24 Part 2 Energy and Accessibility Code and Regulation Plan Review and Inspection Fees
A surcharge shall be added to the building permit fee for the cost to plan review and inspect for compliance with State of California Title 24 Regulations. This fee is calculated at fifteen percent (15%) of the building permit fee. This fee is applied whenever a plan review is assessed.

State of California Mandated Building Standards Fee – SB 1473 A surcharge shall be added to all building permits at the rate of four dollars ($4) per one hundred thousand dollars ($100,000) in valuation, with appropriate fractions thereof, but not less than one dollar ($1). These funds will be available to the California Building Standards Commission, the Department of Housing and Community Development, and the Office of the State Fire Marshall for expenditure in carrying out the provisions of the State Building Standards Law and provisions of State Housing Law that relate to building standards. Up to ten percent (10%) shall be retained for related administrative costs and for code enforcement education.
139 Each ejector/sump pump $38.00 $41.00
140 Each vacuum breaker/hose bib $11.00 $12.00
141 Each water piping system repair or replacement $24.00 $26.00 142 Each additional gas outlet $24.00 $26.00
143 Duplicate job card $25.00 $27.00
144 Permit extension (applies to permits that have not
expired)
$78.00 $85.00
145 Duplicate Inspection Card $30.00 $33.00
146 NPDES Inspection Fee (Charged on all building
permits with the potential to generate non-point
source storm water runoff during construction)
$70.00 $76.00

Page 257 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 14

DEVELOPMENT SERVICES
Planning Division
The fees listed below constitute all fees imposed by the Planning Division. Certain types of applications must be reviewed / processed by other departments/agencies, which may impose separate fees. Applicants are advised that the fees for those services are not included in the Planning Department's fees. Where the term "actual cost" is used here, it shall mean:
materials, supplies (including any costs of noticing or publication), outside consultants, employee cost will be billed at the top step, plus benefits, plus overhead. The following fee schedule is established for applications filed pursuant to the Town Code. The fees are collected by the Community Development Department at the time the application is filed unless otherwise noted.
• Fees for Additional Processing - In the event additional processing services by the Town are required due to changes, modifications, additions, errors, omissions, or discrepancies caused by the applicant or his/her agents or representatives, the applicant shall pay an additional fee as determined by the Director of Community Development to cover the actual cost.
• Fees for Lack of Progress - If additional information is required by the Town for an application and the requested information is not submitted within 180 days, the applicant will be required to pay a fee of 10 percent of the current application fee at the time the requested information is submitted. Any re-submittal after one year will be processed as a new application, subject to new fees.
• Fees for Major Projects - If it is anticipated that the application processing costs of selected major projects will significantly exceed the following fees, the Director of Community Development may collect a deposit and charge actual time spent to process the applications based upon current hourly rates.
• Surcharges - All of the following applications are subject to the surcharge fees as set forth in General Development Services and in the Zoning Research section of Planning Division.

Page 258 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 15

DEVELOPMENT SERVICES
Zoning Approvals - Architecture and Site Applications – Development Review Committee (DRC) Approval
Zoning Approvals – Architecture and Site Applications – Planning Commission Approval 147 New single family detached (HR and RC zones) $8,978.00 $9,741.00 Engineering Development Review Service Fee $4,151.00 $4,504.00 148 New non-custom single family detached (HR and RC
zones) per unit/model, as part of a Planned
Development**
$6,235.00 $6,765.00
Engineering Development Review Service Fee $4,148.00 $4,501.00 149 New single family or two family units $6,187.00 $6,713.00 Engineering Development Review Service Fee $4,149.00 $4,502.00 150 New single family or two family (any other zone) per unit/model new nonresidential or multiple family per
building as part of a Planned Development**
$4,421.00 $4,797.00
Engineering Development Review Service Fee $4,153.00 $4,506.00 151 Minor projects (a development proposal that does not significantly change the size, mass, appearance or
neighborhood impact of a structure, property or
parking lot
$2,243.00 $2,434.00
Engineering Development Review Service Fee $3,186.00 $3,457.00 152 Supplemental fee DRC applications as determined
with fee #146 or minor residential development
applications or applications that are part of a Planned Development that require Planning Commission
approval
$3,168.00 $3,437.00
Engineering Development Review Service Fee $1,157.00 $1,255.00 153 New two family unit $9,437.00 $10,239.00
Engineering Development Review Service Fee $4,151.00 $4,504.00 154 New nonresidential (includes conceptual Planned
Development elevations)
$10,832.00 $11,753.00
Engineering Development Review Service Fee $4,151.00 $4,504.00 155 New multiple family (includes conceptual Planned
Development elevations)
$9,847.00 $10,684.00
Engineering Development Review Service Fee $4,149.00 $4,502.00

Page 259 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 16

DEVELOPMENT SERVICES
Zoning Approvals – Architecture and Site Applications – Planning Commission Approval (continued)
Conditional Use Permits
Rezoning (other than Planned Development)
156 All other (i.e. exceed FAR, major grading, etc.) $5,491.00 $5,958.00 Engineering Development Review Service Fee $4,151.00 $4,504.00 *Aside from the fees noted above, no additional Architecture and Site application fees will be assessed for projects that involve a historic structure or site. **Any changes proposed to model homes, nonresidential, or multiple family buildings, a supplemental fee shall be based on a time and materials basis to review the changes. 157 Conditional Use Permit $6,351.00 $6,891.00
Engineering Development Review Service Fee $1,351.00 $1,466.00 158 Conditional Use Permit (when consolidated with
another application for new development)
$1,056.00 $1,146.00
Engineering Development Review Service Fee $774.00 $840.00 159 Conditional Use Permit for Minor Restaurant (DRC
Approval)
$3,865.00 $4,194.00
Engineering Development Review Service Fee $1,160.00 $1,259.00 160 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 1
$6,351.00 $6,891.00
Engineering Development Review Service Fee $1,736.00 $1,884.00 161 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 2 includes alcohol and/or
entertainment (must pay #159 below with this
application)
$7,506.00 $8,144.00
Engineering Development Review Service Fee $1,735.00 $1,882.00 162 Applications that require Town Council Approval
(these fees supplement the above established fees)
$3,012.00 $3,268.00
Engineering Development Review Service Fee $1,158.00 $1,256.00 Transcription of Planning Commission
minutes - Actual cost and minimum
$500.00 deposit
163 Without General Plan or Specific Plan Amendment Actual Cost ($5,000.00 minimum) 164 With General Plan or Specific Plan Amendment Actual Cost ($7,000.00 minimum) 165 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00 deposit

Page 260 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 17

DEVELOPMENT SERVICES
Planned Development
Planning Division Certificates of Use and Occupancy
Sign Application
Administrative Land Use Permit
166 Without General Plan or Specific Plan Amendment Actual Cost 167 Without General Plan or Specific Plan Amendment
(HR or RC Underlying Zone)
Actual Cost
168 With General Plan or Specific Plan Amendment Actual Cost 169 With General Plan or Specific Plan Amendment (HR or RC Underlying Zone)
Actual Cost
170 Town Council Modification to a Planned Development Actual Cost ($5,000.00 minimum) 171 DRC Modification to a Planned Development Actual Cost ($3,000.00 minimum) 172
173 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00 deposit
Publication costs for the planned development ordinance shall be paid by the applicant 174 Change of use $230.00 $250.00
175 Change of occupancy (excluding change of proprietor of a continuing business enterprise)
$155.00 $168.00
176 Use/occupancy clearance if Conditional Use Permit is required or occupancy of a new accessory dwelling
unit
No fee
177 New permanent sign $310.00 $336.00
178 Temporary nonresidential sign $99.00 $107.00
179 Change of face only $155.00 $168.00
180 Sign program $2,075.00 $2,251.00
181 Minor telecommunications facility (i.e. microcell,
8,021 lb. or equivalent)
$1,535.00 $1,665.00
182 Major telecommunications facility which do not
require a Conditional Use Permit
$3,681.00 $3,994.00

Page 261 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 18

DEVELOPMENT SERVICES
Other Zoning Approvals Fees
Subdivisions
183 Variance $4,671.00 $5,068.00
Engineering Development Review Service Fee $1,351.00 $1,466.00 184 Minor Residential Development (see #151) $2,243.00 $2,434.00 185 Agricultural Preserve Withdrawal $3,810.00 $4,134.00 186 Hazardous Materials Storage Facility Application Fully allocated rate of all personnel, plus noticing fees
187 Home Occupation Permit $155.00 $168.00
188 Accessory Dwelling Unit $1,340.00 $1,454.00
189 Two-Unit Housing Development $1,340.00
190 Urban Lot Split $1,340.00
191 Mobile Home Park Conversion Permit Fully allocated rate of all personnel with initial deposit of $5,000.00
192 General Plan/Town Code Amendments Fully allocated rate of all personnel with initial deposit of $5,000.00 plus
additional fees
193 Lot Line Adjustment (DRC Approval) $2,128.00 $2,309.00 Engineering Development Review Service Fee $3,571.00 $3,875.00 194 4 Lots or Less (DRC Approval) $8,575.00 $9,304.00
Engineering Development Review Service Fee $3,960.00 $4,297.00 195 4 Lots or Less (as part of a Planned Development)
(DRC Approval)
$3,541.00 $3,842.00
Engineering Development Review Service Fee $4,153.00 $4,506.00 196 5 Lots or More $9,660.00 $10,481.00
Engineering Development Review Service Fee $5,115.00 $5,550.00 197 5 Lots or More (as part of a Planned Development)
(DRC Approval)
$4,152.00 $4,505.00
Engineering Development Review Service Fee $5,118.00 $5,553.00 198 Vesting Tentative Map (VTM) Actual Cost plus $500.00 deposit and additional fees
199 Lot Merger and Reversion to Acreage (DRC Approval) $1,055.00 $1,145.00 Engineering Development Review Service Fee $3,570.00 $3,873.00 200 Condominium $7,445.00 $8,078.00
201 Condominium (as part of a Planned Development) $3,541.00 $3,842.00 202 Certificate of Compliance (DRC Approval) $3,076.00 $3,337.00 Engineering Development Review Service Fee $2,219.00 $2,408.00

Page 262 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 19

DEVELOPMENT SERVICES
Subdivisions (continued)
Miscellaneous Application Fees
Environmental Assessment Fees
203 VTM applications that require Town Council approval, Subdivision and/or DRC applications that require
Planning Commission approval. This fee supplements
the above-established fees.
$2,824.00 $3,064.00
204 Time Extensions to Approved Application 50% of current fee (excluding fees based on actual cost)
205 Modification to Approved Application 75% of current fee (excluding fees based on actual cost)
206 Conceptual Development Advisory Committee Review $2,966.00 Special Noticing - Actual Cost
(minimum $500.00 deposit)
207 Push Cart Permit $492.00 $534.00
208 Auto Dealer Events Smaller Promotional Events $82.00 $89.00
Large Promotional Events $401.00
$435.00
209 News rack Permit Fee $390.00 $423.00
210 Firearms Dealer Permit (Town Ordinance 2217 dated
6/17/2013)
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
211 Categorical Exemption No fee
212 Initial Study Deposit*** Fully allocated hourly rate of all personnel with initial $5,000.00
deposit
213 Draft Initial Study Review Fee (or actual cost if part of a Planned Development, General Plan and/or Town
Code Amendment
$2,786.00 $3,023.00
Engineering Development Review Service Fee $1,931.00 $2,095.00 214 Environmental Impact Report Consultant's fee

Page 263 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 20

DEVELOPMENT SERVICES
Environmental Assessment Fees (continued)
Surcharges
Appeals
215 Draft EIR Review Fee Fully allocated hourly rate of all personnel plus any necessary outside
costs
216 Impact Monitoring Program (AB3180) Fully allocated hourly rate of all personnel plus any necessary outside
costs
***The $5,000 fee is a deposit only. The specific cost of the Initial Study and any required special studies shall be borne by the applicant. The deposit shall be increased before the Town will authorize work exceeding the amount on deposit. Any deposit balance will be refunded. 217 General Plan update surcharge .5% of building valuation for new construction and additions/10% of
zone change and subdivision fee
218 Advanced Planning projects 10% of application fee
219 Administrative Fee 10% of development application fee 220 Fee to appeal Planning Commission decision to Town
Council
Per Residential $438.00 $475.00
Per Commercial, multi-family or
tentative map $1,763.00 $1,913.00
221 Fee to remand applications from Town Council to
Planning Commission
Fully allocated hourly rate for all
personnel plus additional fees
222 Fee to appeal Director of Community Development or
Development Review Committee decision to Planning
Commission
Per Residential $221.00 $240.00
Per Commercial $882.00 $957.00
223 Tree appeals $90.00 $98.00
224 Appeal transcription fee of Planning Commission
minutes (only applies to appeals from Planning
Commission to Town Council)
Actual Cost - minimum $500.00
deposit

Page 264 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 21

DEVELOPMENT SERVICES
Zoning Research
Other Planning Division Fees
Payment of Application Fees
All application fees are to be paid at the time the applications are submitted to the Community Development Department. If the applicant withdraws an application, which requires a hearing by the Planning Commission, prior to processing the application for the hearing, 40% of the paid application fee shall be refunded to the applicant at the discretion of the Director of Community Development. All other fees are non-refundable. 225 Basic Zoning Letter $155.00 $168.00
226 Legal non-conforming verification $650.00 $705.00
227 Reconstruction of legal non-conforming structures
(Burndown Letter)
$276.00 $299.00
228 Fence Height Exceptions $276.00 $299.00
229 Peer/Technical Review - any remaining deposit will
be refunded to the applicant and amounts exceeding
the deposit amount will be paid by applicant
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
230 Fees For Additional Tech Review and/or DRC Review - DRC beyond three meetings, Planning Commission
hearing beyond two meetings, Town Council hearing
beyond one meeting
Fully allocated hourly rate of all
personnel involved plus additional
fees
231 Consultation Actual cost on an hourly basis
232 Research Services Minimum Charge Fully allocated hourly rate for all personnel with initial $200.00 deposit
233 Building Permit Plan Check Fee 20% of building fee
234 Below Market Price Housing Program In-Lieu Fee 6% of the building permit valuation for the entire project
235 Outdoor Seating Permit Fully allocated hourly rate for all personnel with initial $1,000.00
deposit
236 Valet Parking Permit Fully allocated hourly rate for all personnel with initial $1,000.00
deposit
237 Parklet Program Fully allocated hourly rate for all personnel with initial $1,000.00
deposit

Page 265 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 22

DEVELOPMENT SERVICES
Engineering Division
The following fees constitute a comprehensive listing of the various fees charged by the Engineering Program. Certain types of application/permits must be reviewed and/or processed by other Town departments or public agencies, which may charge separate fees. Applicants are advised that the fees for those services are not included in the Engineering Program's fees.

Where the term "actual cost (s)" is used here it shall mean: materials, supplies (including any costs of noticing or publication), outside consultants and employee cost, (including salary, benefits and overhead).

Engineering Plan Check Fee (Public Improvements & Grading Permits) * Inspection Fee (Public Improvements & Grading Permits)
238 Application Fee $490.00 $532.00
239 Under $20,000.00 15.5% of valuation
240 $20,000.00 to $80,000.00 $3,100.00 $3,364.00 plus 9% of valuation
241 Greater than $80,000 $8,500.00 $9,223.00 plus 8.5%
valuation
242 Each additional plan check beyond three reviews Fully allocated hourly rate for all personnel
243 Under $20,000.00 7.5% of valuation
244 $20,000.00 to $80,000.00 $1,500.00 $1,628.00 plus 6.5% of valuation
245 Greater than $80,000.00 $5,400.00 $5,859.00 plus 4.0% of valuation

Page 266 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 23

DEVELOPMENT SERVICES
Work In or Use of Public Right-of-Way *
NPDES
246 Encroachment Permit - Residential Work up to $4,000.00 - $305.00 $331.00
Each additional $2,000.00 - $160.00
$174.00
247 Encroachment Permit - Collector/Arterial Streets** Work up to $4,000.00 - $1,580.00 $1,714.00
Each additional $2,000.00 - $345.00
$374.00
248 Outside contractor underground utility locating
surcharge (actual cost for outside contractor
inspection fee may change)
$95.00
249 Temporary Encroachment Permit $150.00 $163.00
250 Dumpster Permit $150.00 $163.00
251 Storage Permit $150.00 $163.00***
* Work done at night or on weekends shall be charged the actual costs of staff ** Single-family residences located along collector and arterial streets to be charged the residential fees above
*** $500.00 refundable Storage Unit Removal Deposit, to cover cost of removal, if abandoned 252 Inspection Fee - Grading Permits Single Family Residential $730.00 $792.00
Commercial or Multi Family
Residential $1,135.00 $1,231.00
253 Inspection Fee - Encroachment Permits and Some
Storage Permits
Single Family Residential $200.00
$217.00
Commercial or Multi Family
Residential $325.00 $353.00
Plus $485.00 $526.00 per LID facility
254 Inspection of Storm Water Treatment Measures $500.00 $543.00 per facility 255 Annual Stormwater/Limited Impact Development (LID)
Permit
Per Visit and 1st facility inspection
$485.00 $526.00
Every additional facility inspection
$160.00 $174.00
256 C-3 Permit Hydrologic Calculation Fully allocated hourly rate for all personnel plus any outside cost and
initial deposit of $3,750.00

Page 267 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 24

DEVELOPMENT SERVICES
Engineering Subdivision Map Checking
Traffic Impact Analysis or Parking Study
Storm Drainage Fees
257 1-4 lots $2,855.00 $3,098.00*
258 5 or more lots $3,995.00 $4,335.00*
*Plus, initial $3,000 surveyor deposit. Additional deposit(s) of actual surveyor costs may be required for larger projects than 5 or more lots, additional map check review(s), or overall complexity of the map.
259 Development Review (staff traffic impact analysis or Parking Study)
Actual Cost
Consultant Report - Consultant Fee
260 Staff Review Fee $664.00 $720.00 plus 10% of the
traffic consultant report cost
261 Site Distance Analysis $178.00 $193.00 per review not to exceed two hours. Actual cost for
staff time when analysis exceeds two
hours.
262 Traffic Impact Mitigation Fee $958.00 $1,039.00 per new average daily trip generated
263 Development Projects Single family lots Section

24.60.035(b) (3): For subdivision
whose lots exceed one acre, the fee
shall not exceed that of one acre per
lot $4,228.00 $4,587.00/ac.

Multiple family dwelling units - initial
unit $4,228.00 $4,587.00/ac.

Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $159.00 $173.00
Commercial, industrial, hospitals,
churches, schools, and others
$5,286.00 $5,735.00/ac.
264 Building/Grading Permits (Building, Structures, &
impervious areas)
New impervious surface area, per sq.
ft. $1.00/sq. ft.

Page 268 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 25

DEVELOPMENT SERVICES
Street Improvement In-Lieu Fee
Other In-Lieu Fee
Hauling Permits
Construction Activities Mitigation Fee (Ordinance 2189) Other Engineering Fees
265 Sidewalks $16.00/sq. ft. $20.00/sq.ft.
266 Curb and Gutter $68.00/lf. $100.00/lf.
267 Trail Improvements $16.00/per sq. ft. or determined by Director
268 House Moving Fee $3,490.00 $3,787.00*
269 Hauling (Overweight Vehicle) Permit Daily $16.00**
Annual $90.00
*Plus initial deposit of $5,000 for facilities damage
**The current State mandated fee is $16.00 for Hauling Permit. If the State fee changes, the Hauling Permit fee will change to reflect the same.
270 New Buildings and Additions Residential (per square foot added) $1.17/sq.ft. $1.32/sq.ft.*
Non-residential (per square foot
added) $1.17/sq.ft. $1.32/sq.ft.*
*These two fees are adjusted based on the Building Cost Index 271 Engineering Reversion to Acreage $2,395.00 $2,599.00 plus initial deposit of $2,500 for surveyor
272 Engineering Lot Merger $3,480.00 $3,776.00 plus surveyor deposit
273 Engineering Lot Line Adjustments $3,480.00 $3,776.00 plus surveyor deposit
274 Certificate of Compliance $3,480.00 $3,776.00 plus surveyor deposit
275 Abandon Excess Public Right-of-Way & Public
Easement
$4,345.00 $4,714.00 plus surveyor
and valuation consultant and
planning services

Page 269 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 26

DEVELOPMENT SERVICES
Other Engineering Fees (continued)
276 Geotechnical Peer Review Fees Fully allocated hourly rate of all personnel plus any outside costs and
initial $2,500 deposit. Larger projects
require an initial deposit of $4,500 to
allow for a site visit by the
geotechnical peer review consultant.
277 Separate Instrument Dedication Fee (for dedication
via grant deeds and not maps)
$720.00 $781.00 plus initial deposit
of $2,500 for surveyor
278 Slurry Seal Fee $2.50 per sq.ft.
279 Flood Review Fee Consultant Cost plus 25% Admin Fee 280 Miscellaneous Review Fee* Actual Cost
*This fee will be implemented for services including, but not limited to, wet weather inspections, annual inspections, review of operations and maintenance reports, coordination with property owner(s) and/or homeowner associations, etc.

Page 270 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 27

LIBRARY SERVICES
Lost or Damaged Items
In lieu of above, account holder may replace lost/damage item with new identical copy plus $2.00 processing fee.

Internet printing and copies
History Project Digital Image
1 Replacement of Adult book/AV item Cost of item plus $10.00 processing fee
2 Replacement of Teen/Children’s book/AV item Cost of item plus $5.00 processing fee
3 Replacement of Adult paperback Cost of item plus $5.00 processing fee
4 Replacement of magazine Cost of item plus $5.00 processing fee
5 Printing per page - Black and White Copies $0.15
6 Printing per page - Color Copies $0.25
7 Fair Use Fees (for personal use only) Free – Downloaded via History Website
8 Commercial Use Fees $25.00 per high resolution image

Page 271 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 28

PARKS AND PUBLIC WORKS SERVICES
Parks Division
Oak Meadow Park
Picnic Areas (1 through 9)
Bandstand/Gazebo
Minimum two-hour reservation required.

Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only. 1 Facility Fee Resident $95.00 per site
Non-Resident $150.00 per site
2 Facility fee w/Jump House Permit Resident $190.00 per site Non-Resident $300.00 per site
3 Non-Profit Event Resident $65.00 per hour
Non-Resident $120.00 per hour
4 Public Event Resident $95.00 per hour
Non-Resident $150.00 per hour
5 Deposit (refundable) $500.00
6 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
7 Deposit (refundable) $100.00
8 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
9 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
10 Deposit (refundable) $100.00

Page 272 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 29

PARKS AND PUBLIC WORKS SERVICES
Other Oak Meadow Park Fees
Creekside Sports Park
Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only.

Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor (Groups of 25+ and/or Jump House) Single Use Permit
11 Bocce Ball Court Fee Resident $95.00 per day
Non-Resident $150.00 per day
12 Parking Fee Resident No Charge
Non-Resident $6.00 per vehicle
13 Vehicle Escort Fee Resident $75.00
Non-Resident $100.00
14 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
15 Deposit (refundable) $500.00
16 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
17 Additional Day Resident $55.00 per additional day
Non-Resident $75.00 per additional
day
18 Deposit (refundable) $500.00
19 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
20 Deposit (refundable) $100.00

Page 273 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 30

PARKS AND PUBLIC WORKS SERVICES
Multi-Use Permit
Multi-Use Permit for recreational/educational purposes only.

Town Plaza Use Permit
A permit fee is $55.00 per hour for events that close the Town Plaza entirely to the public. This fee will be charged for the number of hours the Town Plaza cannot be used safely by the public due to the event. Additional fees or deposits may be charged for lawn repair, street closures, and/or additional maintenance, as determined by the Parks and Public Works Director and/or Maintenance Superintendent.

Civic Center Lawn Use Permit
A permit fee is $55.00 per hour for events that restrict the use of the Civic Center Lawn.

Additional fees or deposits may be charged for lawn repair, street closures, and/or additional maintenance, as determined by the Parks and Public Works Director and/or Maintenance Superintendent.

Turf Maintenance Fee
Additional fee added to any Park Use or Special Event Permit, when a permit's scheduled activity or event will negatively impact the park turf, (locations including but not limited to Oak Meadow, Town Plaza, and Civic Center lawn areas). The fee amount is to be based upon best estimate of turf repair cost, as determined by the Director of Parks and Public Works and/or Maintenance Superintendent.
21 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
22 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
23 Deposit (refundable) $100.00

Page 274 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 31

PARKS AND PUBLIC WORKS SERVICES
Tree Related Fees
Equipment Hourly Rates as Follows
24 Tree Removal Permit Application* One Tree $250.00
Additional Tree $125.00/each
If application is denied 50% refund
25 Illegal Tree Removal Administrative Fee $330.00
26 Replacement Trees - Town Forestry Fund Per Tree
Ordinance Section 29.10.0985
Tree cost for each 24”,36", and/or
48" box size will be the Market Price
plus the installation cost, determined
by the Director
*Fee will be waived if tree removal is done to implement or maintain Defensible Space. 27 Pick-up Truck $32.00
28 1 Ton Flatbed Truck $42.00
29 Utility Truck $57.00
30 Dump Truck (10 Wheel) $85.00
31 Dump Truck (Bobtail) $63.00
32 Paint Truck $85.00
33 Line Remover $26.00
34 Tractor Loader $63.00
35 Backhoe $85.00
36 Rubber-tired Loader $85.00
37 Roller $63.00
38 Van $37.00
39 Concrete Saw $32.00
40 Air Compressor $32.00
41 Arrowboard $32.00
42 Generator $26.00
43 Chainsaw $20.00
44 Blower $10.00
45 Paving Box $63.00
46 Rodder $63.00
47 High Pressure Sewer Cleaner $117.00
48 Brush Chipper $42.00
49 Chipper Truck $63.00
50 Aerial Unit $92.00
51 Street Sweeper $92.00
52 Forklift $42.00
53 Trailer $42.00
54 Message Board $10.81
55 Barricades $0.23

Page 275 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 32

PARKS AND PUBLIC WORKS SERVICES
Equipment Hourly Rates as Follows (continued)
Streets Division
Hazard and/or Debris Removal
Special Events Fees
Electric Vehicle Charging Fee
56 Cones $0.15
57 Portable Generators $28.04
58 Staff time spent to conduct hazard and or debris
removal caused by citizen negligence
Fully allocated hourly rate of all
personnel plus any outside costs
59 Staff and equipment for special event requests Fully allocated hourly rate of all personnel
60 System Connection Fee $1.00
61 Hourly Charge - 1- 4 hours $1.00/hour
62 Hourly Charge - after 4 hours $5.00/hour

Page 276 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 33

POLICE SERVICES
Printing and Copying Charges
Photographs
Concealed Weapons
Tow Trucks
Massage Permit Fees
Fee covers staff time to process application, review pertinent documents, arrange for fingerprints and photographs to be taken and obtain all necessary approvals.

Special Events
Other Special Police Services – Pursuant to Agreement between Police Chief and Requestor. 1 8 1/2" x 11 and 8 1/2" x 14 $.25 per page
2 Copy - Digital $10.00 per device
3 For the first 3 $42.00
4 Each Additional $13.00
5 Permit Fee, DOJ Fee, and Admin Fee $100.00
6 Renewal Permit $25.00
7 Amended Permit $10.00
8 Tow Permit $95.00
9 Driver Permit $370.00
10 Initial Application for each Therapist $213.00
11 Annual Renewal for each Therapist $107.00
12 Massage Establishment Permit (initial and
subsequent renewals) (Ord 14.110.075)
$415.00
13 ABC Application No charge
14 No Parking Signs $0.46/each
15 Officer Staffing Fully allocated hourly rate of all
personnel
16 Bingo Permit $170.00

Page 277 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 34

POLICE SERVICES
Motion Picture/Television/Commerical Still Photo
Emergency Response Caused By
Alarm Fees
Citation issued for failure to display appropriate Permit or placard. Dismissal fee in lieu of full Bail Amount
Parking Permit Fees
Residential Parking Permit
17 For-Profit Groups (each) $1,609.00
18 Non-For-profit Groups (each) $579.00
19 DUI Emergency Accident Response (Government
Code Section 53155)
Actual costs incurred up to
$12,000.00
20 Second Response due to Disturbances At current billing rate 21 Commercial Alarm Registration Fee $95.00
22 Second False Alarm* $170.00
23 Third False Alarm* $170.00
24 Fourth False Alarm* $170.00
25 Fifth False Alarm* No response, no charge, at the
Chief’s discretion
*Within a six-month period within a calendar year
26 Handicap CVC22507.8/22500(1) $37.00
27 Parking Permits $10.00
28 Annual residential parking permit/per vehicle (Limit 4 per residence)
$42.00
29 Visitor guest passes Two (2) complimentary with the
purchase of the primary permit
30 Special Event Permit -First permit (one day) $10.00
31 Special Event Permit -Each Additional (one day) $2.00 32 Replacement permit for vehicle change (within
calendar year)
$10.00
33 Lost permit replacement $37.00
34 Damaged permit replacement (with return of permit) $18.00

Page 278 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fee Schedule 35

POLICE SERVICES
Parking Permit Fees (continued)
Business Parking Permit
Construction Parking Permit
Other Police Fees
35 Standard Employee annual $248.00
36 Lost permit replacement $37.00
37 Damaged permit replacement (with return of permit) $18.00 38 One day parking permit per construction vehicle $32.00 39 Each additional day per vehicle $5.00
40 Fingerprinting - per each Livescan application (Plus additional DOJ or FBI fees which are based on the
level of service for the application) Fingerprint fees
are subject to increase based on DOJ or FBI fees
$80.00
41 Subpoena Duces Tecum Per California Evidence Code Section 1563
42 Solicitor/Peddler's Permit $55.00 plus fingerprinting 43 Bicycle Licenses (each) $3.00
44 Taxicabs Permit $185.00 per business
45 Clearance Letter $25.00
46 Horse Drawn Vehicle Permit $270.00
47 Firearms Storage Fee $245.00 Admin Fee plus $1.00 per firearm per day for storage
48 Vehicle Release $235.00
49 Vehicle Repossession Release Fee (Government Code
Section 41612)
$15.00
50 Non-Los Gatos Cite Sign Off $27.00
51 Feral Cat Feeder/Trap Permit $42.00

Page 279 ends
Page 280 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
Address Processing Fee - per address $160.00 $165.00 $169.00 $174.00 BMP Document Processing Fee $575.00 $595.00 $609.00 $624.00 1 Lot $3,010.00 $3,112.00 $3,188.00 $3,266.00
2 Lots $1,505.00 $1,556.00 $1,594.00 $1,633.00
3 Lots $1,005.00 $1,039.00 $1,064.00 $1,090.00
4 Lots $755.00 $781.00 $800.00 $819.00
5 Lot or more $600.00 $620.00 $635.00 $651.00
Fee for issuing/reinstating a Building Permit $55.00 $57.00 $58.00 $60.00 Additional Building Permit Fee $30.00 $31.00 $32.00 $33.00 Demolition Permit Residential: $265.00 Residential: $274.00 Residential: $281.00 Residential: $288.00 Commercial: $465.00 Commercial: $481.00 Commercial: $492.00 Commercial: $505.00 Construction Valuation
$1.00 to $500.00 $32.99 $34.00 $35.00 $36.00
$501.00 to $2,000.00 $32.99 for the first $500.00 plus $4.28 for each additional $100.00 or fraction
thereof, to and including $2,000.00
$34.00 for the first $500.00 plus $4.42
for each additional $100.00 or fraction
thereof, to and including $2,000.00
$35.00 for the first $500.00 plus $4.53
for each additional $100.00 or fraction
thereof, to and including $2,000.00
$36.00 for the first $500.00 plus $4.64
for each additional $100.00 or fraction
thereof, to and including $2,000.00
$2,001.00 to $25,000.00 $97.23 for the first $2,000.00 plus $19.66 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$101.00 or the first $2,000.00 plus
$20.29 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$103.00 or the first $2,000.00 plus
$20.82 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$105.00 or the first $2,000.00 plus
$21.33 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$25,001.00 to $50,000.00 $549.32 for the first $25,000.00 plus $14.18 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$568.00 for the first $25,000.00 plus
$14.63 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$582.00 for the first $25,000.00 plus
$15.02 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$596.00 for the first $25,000.00 plus
$15.39 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$50,001.00 to $100,000.00 $903.83 for the first $50,000.00 plus $9.83 for each additional $1,000.00 or
fraction thereof, to and including
$100,000.00
$935.00 for the first $50,000.00 plus
$10.14 for each additional $1,000.00 or
fraction thereof, to and including
$100,000.00
$957.00 for the first $50,000.00 plus
$10.41 for each additional $1,000.00 or
fraction thereof, to and including
$100,000.00
$981.00 for the first $50,000.00 plus
$10.67 for each additional $1,000.00 or
fraction thereof, to and including
$100,000.00
$100,001.00 to $500,000.00 $1,395.23 for the first $100,000.00 plus $7.86 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00
$1,443.00for the first $100,000.00 plus
$8.11 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00
$1,478.00 for the first $100,000.00 plus
$8.32 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00
$1,514.00 for the first $100,000.00 plus
$8.53 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00
$500,001.00 to $1,000,000.00 $4,540.19 for the first $500,000.00 plus $6.67 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00
$4,695.00 for the first $500,000.00 plus
$6.88 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00
$4,808.00 for the first $500,000.00 plus
$7.06 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00
$4,926.00 for the first $500,000.00 plus
$7.24 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00
$1,000,001.00 and over $7,874.69 for the first $1,000,000.00 plus $4.42 for each additional $1,000.00
or fraction thereof
$8,142.00 for the first $1,000,000.00
plus $4.56 for each additional $1,000.00
or fraction thereof
$8,339.00 for the first $1,000,000.00
plus $4.68 for each additional $1,000.00
or fraction thereof
$8,544.00 for the first $1,000,000.00
plus $4.80 for each additional $1,000.00
or fraction thereof
Inspection outside normal business hours (4 hr.
minimum)
$192.00/hr. $199.00/hr. $203.00/hr. $208.00/hr.

Re-inspection fees $160.00/hr. $165.00/hr. $169.00/hr. $174.00/hr.

Inspections for which no fee is specifically indicated (2 hr. minimum)
$160.00/hr. $165.00/hr. $169.00/hr. $174.00/hr.

Additional plan review required by changes, additions or revisions to plans (1 hr. minimum)
$152.50/hr. $158.00/hr. $161.00/hr. $165.00/hr.

FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments General Development Fees
Annexation Fees
Building Permit Fees
New Construction and Addition
Special Services & Inspections
ATTACHMENT 4

Page 281 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments Services for which no fee is specifically indicated (1/2 hr. minimum)
$160.00/hr. $165.00/hr. $169.00/hr. $174.00/hr.

Permit/Plan check time extension (per permit) (applies
to permits that have not expired)
$78.00 $81.00 $83.00 $85.00
Express plan review or initial review (1 hr. minimum) $160.00/hr. $165.00/hr. $169.00/hr. $174.00/hr.

Application for the Appeals Building Board Review $273.00 $282.00 $289.00 $296.00 Temporary Certificate of Occupancy $1,095.00 $1,132.00 $1,160.00 $1,188.00 Convert Garage to habitable space $117.00/sq. ft. $121.00/sq.ft. $124.00/sq.ft. $127.00/sq.ft.

Convert unfinished basement or attic to habitable $127.00/sq. ft. $131.00/sq.ft. $134.00/sq.ft. $138.00/sq.ft.

Pools/Spas (gunite) $76.00/sq. ft. $79.00/sq.ft $80.00/sq.ft $82.00/sq.ft Siding - aluminum/vinyl/wood $32.00/sq. ft. $33.00/sq.ft. $34.00/sq.ft. $35.00/sq.ft.

Commercial Awning or Canopy Aluminum $32.00/sq. ft. $33.00/sq.ft. $34.00/sq.ft. $35.00/sq.ft.

Canvas $24.00/sq. ft. $25.00/sq.ft. $25.00/sq.ft. $26.00/sq.ft.

Fence or Freestanding Wall (over 6" high) Wood or metal $49.00/lf. $51.00/sq.ft. $52.00/sq.ft. $53.00/sq.ft.

Masonry $85.00/lf. $88.00/sq.ft. $90.00/sq.ft. $92.00/sq.ft.

Decks/Balcony $47.00/sq. ft. $49.00/sq.ft. $50.00/sq.ft. $51.00/sq.ft.

Wood Deck $20.00/sq. ft $21.00/sq.ft. $21.00/sq.ft. $22.00/sq.ft.

Re-roofs $3.00/sq. ft. $3.00/sq.ft. $3.00/sq.ft. $3.00/sq.ft.

Retaining Walls $107.00/lf. $111.00/sq.ft. $113.00/sq.ft. $116.00/sq.ft.

Emergency generation, wind power, special HVAC
systems, etc.

Plan Review (1 hr. minimum)
$152.50/hr.

Plan Review (1 hr. minimum)
$158.00/hr.

Plan Review (1 hr. minimum)
$161.00/hr.

Plan Review (1 hr. minimum)
$165.00/hr.

Field Inspection (2 hr. minimum)
$160.00/hr.

Field Inspection (2 hr. minimum)
$165.00/hr.

Field Inspection (2 hr. minimum)
$169.00/hr.

Field Inspection (2 hr. minimum)
$174.00/hr.

Photovoltaic - Roof & Ground Mounted - Residential Plan Review (1/4 hr. minimum) $152.50/hr.

Plan Review (1/4 hr. minimum)
$158.00/hr.

Plan Review (1/4 hr. minimum)
$161.00/hr.

Plan Review (1/4 hr. minimum)
$165.00/hr.

Field Inspection (1 hr. minimum)
$160.00/hr.

Field Inspection (1 hr. minimum)
$165.00/hr.

Field Inspection (1 hr. minimum)
$169.00/hr.

Field Inspection (1 hr. minimum)
$174.00/hr.

Photovoltaic - Roof & Ground Mounted - Commercial Plan Review (1 hr. minimum) $152.50/hr.

Plan Review (1 hr. minimum)
$158.00/hr.

Plan Review (1 hr. minimum)
$161.00/hr.

Plan Review (1 hr. minimum)
$165.00/hr.

Field Inspection (2 hr. minimum)
$160.00/hr.

Field Inspection (2 hr. minimum)
$165.00/hr.

Field Inspection (2 hr. minimum)
$169.00/hr.

Field Inspection (2 hr. minimum)
$174.00/hr.

Other Miscellaneous Factors to Determine Construction Valuation Special Systems Fees

Page 282 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments Fee for issuing/reinstating an Electrical Permit $55.00 $57.00 $58.00 $60.00 Additional Electrical Permit Fee $25.00 $26.00 $26.00 $27.00 Plan review fee 25% of Electrical Permit Fee
Additional plan review $152.50/hr. $158.00/hr. $161.00/hr. $165.00/hr.

Re-inspection fee $160.00/hr. $165.00/hr. $169.00/hr. $174.00/hr.

Private swimming pools $63.00 $65.00 $67.00 $68.00
Public swimming pools $114.00 $118.00 $121.00 $124.00
Temporary power poles $78.00 $81.00 $83.00 $85.00
Temporary distribution system & temporary lighting $38.00 $39.00 $40.00 $41.00 Installation of illuminated signs (each) $101.00 $104.00 $107.00 $110.00 Receptacle, switch and lights $2.00 $2.00 $2.00 $2.00
Residential appliances/new circuits (cook top, oven,
range, disposals, clothes dryers, or other motor operated appliances not exceeding one horsepower)
$6.00 $6.00 $6.00 $7.00
Nonresidential appliances/new circuits (medical & dental devices, food, beverage, drinking fountains, laundry
machines, or other similar equipment) NOTE: for other
types of air conditioners and other motor-driven
appliances having larger electrical ratings, see
Generators/Motors
$8.00 $8.00 $8.00 $9.00
Power apparatus (generators, transformers, A/C, heat
pumps, baking equipment)
Up to 10 KV, each $16.00 Up to 10 KV, each $17.00 Up to 10 KV, each $17.00 Up to 10 KV, each $17.00 Over 10 KV not over 50 KV, each $32.00 Over 10 KV not over 50 KV, each $33.00 Over 10 KV not over 50 KV, each $34.00 Over 10 KV not over 50 KV, each $35.00 Over 50 KV and not over 100 KV, each
$63.00
Over 50 KV and not over 100 KV, each
$65.00
Over 50 KV and not over 100 KV, each
$67.00
Over 50 KV and not over 100 KV, each
$68.00
Over 100 KV, each $84.00 Over 100 KV, each $87.00 Over 100 KV, each $89.00 Over 100 KV, each $91.00 Motors Up to 10 hp $16.00 Up to 10 hp $17.00 Up to 10 hp $17.00 Up to 10 hp $17.00 Up to 25 hp $32.00 Up to 25 hp $33.00 Up to 25 hp $34.00 Up to 25 hp $35.00 Up to 55 hp $63.00 Up to 55 hp $65.00 Up to 55 hp $67.00 Up to 55 hp $68.00 Over 55 hp $92.00 Over 55 hp $95.00 Over 55 hp $97.00 Over 55 hp $100.00 Transformers Up to 5 KVA $16.00 Up to 5 KVA $17.00 Up to 5 KVA $17.00 Up to 5 KVA $17.00 Up to 10 KVA $32.00 Up to 10 KVA $33.00 Up to 10 KVA $34.00 Up to 10 KVA $35.00 Up to 50 KVA $53.00 Up to 50 KVA $55.00 Up to 50 KVA $56.00 Up to 50 KVA $58.00 Over 50 KVA $77.00 Over 50 KVA $80.00 Over 50 KVA $82.00 Over 50 KVA $84.00 Busways/conduits (per 100 ft) $8.00 $8.00 $8.00 $9.00
Service equipment 200 amps or less $78.00 200 amps or less $81.00 200 amps or less $83.00 200 amps or less $85.00 201 to 999 amps $108.00 201 to 999 amps $112.00 201 to 999 amps $114.00 201 to 999 amps $117.00 Sub-panels $38.00 Sub-panels $39.00 Sub-panels $40.00 Sub-panels $41.00 Installation of spas or saunas $38.00 $39.00 $40.00 $41.00 Electrical Permit Fees
Plan Review & Re-inspection Fees
System Fee Schedule
Unit Fee Schedule

Page 283 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments Duplicate job card $25.00 $26.00 $26.00 $27.00
Permit extension (applies to permits that have not
expired)
$78.00 $81.00 $83.00 $85.00
Fee for issuing/reinstating a Mechanical Permit $55.00 $57.00 $58.00 $60.00 Additional Mechanical Permit Fee $25.00 $26.00 $26.00 $27.00 Plan review fee 25% of Mechanical Permit Fee
Additional plan review $152.50/hr. $158.00/hr. $161.00/hr. $165.00/hr.

Re-inspection fee $160.00/hr. $165.00/hr. $169.00/hr. $174.00/hr.

Installation, of each heating system, A/C, boiler,
compressor or air handler
$38.00 $39.00 $40.00 $41.00
Each duct repair or alteration $11.00 $11.00 $12.00 $12.00 Each fireplace appliance $32.00 $33.00 $34.00 $35.00
Each ventilating fan $11.00 $11.00 $12.00 $12.00
Installation of separate flue or vents not included with the installation of an appliance
$11.00 $11.00 $12.00 $12.00
Installation of each hood with mechanical exhaust Residential $32.00 Residential $33.00 Residential $34.00 Residential $35.00 Commercial $114.00 Commercial $118.00 Commercial $121.00 Commercial $124.00 Each new or repair of gas piping system $70.00 $72.00 $74.00 $76.00 Each additional gas outlet $23.00 $24.00 $24.00 $25.00
Installation of evaporative cooler $32.00 $33.00 $34.00 $35.00 Duplicate job card $25.00 $26.00 $26.00 $27.00
Permit extension (applies to permits that have not
expired)
$78.00 $81.00 $83.00 $85.00
Fee for issuing/reinstating a Plumbing Permit $55.00 $57.00 $58.00 $60.00 Additional Plumbing Permit Fee $25.00 $26.00 $26.00 $27.00 Additional plan review $152.50/hr. $158.00/hr. $161.00/hr. $165.00/hr.

Re-inspection fee $160.00/hr. $165.00/hr. $169.00/hr. $174.00/hr.

Private swimming pools (including heater, water piping, gas piping)
$92.00 $95.00 $97.00 $100.00
Public swimming pools (including heater, water piping,
gas piping)
$138.00 $143.00 $146.00 $150.00
Lawn sprinkler system on one meter $38.00 $39.00 $40.00 $41.00 Each new or repair of gas piping system $70.00 $72.00 $74.00 $76.00 Each drainage, sewer system $38.00 $39.00 $40.00 $41.00 Radiant floor heating system $114.00 $118.00 $121.00 $124.00 Plan Review & Re-inspection Fees
System Fee Schedule
Plan Review & Re-inspection Fees
Unit Fee Schedule
Plumbing Permit Fees
Other Mechanical Fees
Other Electrical Fees
Mechanical Permit Fees

Page 284 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments Each plumbing fixture or trap or set of fixtures on one trap
$11.00 $11.00 $12.00 $12.00
Each sewer cleanout, backflow device $11.00 $11.00 $12.00 $12.00 Each septic system abatement $114.00 $118.00 $121.00 $124.00 Rainwater systems - per drain (inside building) $11.00 $11.00 $12.00 $12.00 Each water heater, water softener $32.00 $33.00 $34.00 $35.00 Each grease interceptor (750 gallon capacity) $78.00 $81.00 $83.00 $85.00 Each grease trap (1-4 fixtures) $44.00 $45.00 $47.00 $48.00 Residential water re-piping $114.00 $118.00 $121.00 $124.00 Each ejector/sump pump $38.00 $39.00 $40.00 $41.00
Each vacuum breaker/hose bib $11.00 $11.00 $12.00 $12.00 Each water piping system repair or replacement $24.00 $25.00 $25.00 $26.00 Each additional gas outlet $24.00 $25.00 $25.00 $26.00
Duplicate job card $25.00 $26.00 $26.00 $27.00
Permit extension (applies to permits that have not
expired)
$78.00 $81.00 $83.00 $85.00
Duplicate Inspection Card $30.00 $31.00 $32.00 $33.00
NPDES Inspection Fee (Charged on all building permits
with the potential to generate non-point source storm
water runoff during construction)
$70.00 $72.00 $74.00 $76.00
New single family detached (HR and RC zones) $8,978.00 $9,283.00 $9,508.00 $9,741.00 Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00 New non-custom single family detached (HR and RC
zones) per unit/model, as part of a Planned
Development**
$6,235.00 $6,447.00 $6,603.00 $6,765.00
Engineering Development Review Service Fee $4,148.00 $4,289.00 $4,393.00 $4,501.00 New single family or two family units $6,187.00 $6,397.00 $6,552.00 $6,713.00 Engineering Development Review Service Fee $4,149.00 $4,290.00 $4,394.00 $4,502.00 New single family or two family (any other zone) per
unit/model new nonresidential or multiple family per
building as part of a Planned Development**
$4,421.00 $4,571.00 $4,682.00 $4,797.00
Engineering Development Review Service Fee $4,153.00 $4,294.00 $4,398.00 $4,506.00 Minor projects (a development proposal that does not
significantly change the size, mass, appearance or
neighborhood impact of a structure, property or parking lot
$2,243.00 $2,319.00 $2,375.00 $2,434.00
Engineering Development Review Service Fee $3,186.00 $3,294.00 $3,374.00 $3,457.00 Unit Fee Schedule
Other Plumbing Fees
Other Fees
Architecture and Site Applications - Development Review Committee (DRC) Approval*

Page 285 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments Supplemental fee DRC applications as determined with
fee #146 or minor residential development applications
or applications that are part of a Planned Development
that require Planning Commission approval
$3,168.00 $3,276.00 $3,355.00 $3,437.00
Engineering Development Review Service Fee $1,157.00 $1,196.00 $1,225.00 $1,255.00 New two family unit $9,437.00 $9,758.00 $9,994.00 $10,239.00 Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00 New nonresidential (includes conceptual Planned
Development elevations)
$10,832.00 $11,200.00 $11,471.00 $11,753.00
Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00 New multiple family (includes conceptual Planned
Development elevations)
$9,847.00 $10,182.00 $10,428.00 $10,684.00
Engineering Development Review Service Fee $4,149.00 $4,290.00 $4,394.00 $4,502.00 All other (i.e. exceed FAR, major grading, etc.) $5,491.00 $5,678.00 $5,815.00 $5,958.00 Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00 Conditional Use Permit $6,351.00 $6,567.00 $6,726.00 $6,891.00 Engineering Development Review Service Fee $1,351.00 $1,397.00 $1,431.00 $1,466.00 Conditional Use Permit (when consolidated with another
application for new development)
$1,056.00 $1,092.00 $1,118.00 $1,146.00
Engineering Development Review Service Fee $774.00 $800.00 $820.00 $840.00 Conditional Use Permit for Minor Restaurant (DRC
Approval)
$3,865.00 $3,996.00 $4,093.00 $4,194.00
Engineering Development Review Service Fee $1,160.00 $1,199.00 $1,228.00 $1,259.00 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 1
$6,351.00 $6,567.00 $6,726.00 $6,891.00
Engineering Development Review Service Fee $1,736.00 $1,795.00 $1,838.00 $1,884.00 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 2 includes alcohol and/or entertainment
(must pay #159 below with this application)
$7,506.00 $7,761.00 $7,949.00 $8,144.00
Engineering Development Review Service Fee $1,735.00 $1,794.00 $1,837.00 $1,882.00 Applications that require Town Council Approval (these
fees supplement the above established fees)
$3,012.00 $3,114.00 $3,190.00 $3,268.00
Engineering Development Review Service Fee $1,158.00 $1,197.00 $1,226.00 $1,256.00 Change of use $230.00 $238.00 $244.00 $250.00
Change of occupancy (excluding change of proprietor of
a continuing business enterprise)
$155.00 $160.00 $164.00 $168.00
New permanent sign $310.00 $321.00 $328.00 $336.00
Temporary nonresidential sign $99.00 $102.00 $105.00 $107.00 Change of face only $155.00 $160.00 $164.00 $168.00
Sign program $2,075.00 $2,146.00 $2,197.00 $2,251.00
Planning Division Certificates of Use and Occupancy
Architecture and Site Applications - Planning Commission Approval Conditional Use Permits
Sign Application

Page 286 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments Minor telecommunications facility (i.e. microcell, 8,021 lb. or equivalent)
$1,535.00 $1,587.00 $1,626.00 $1,665.00
Major telecommunications facility which do not require
a Conditional Use Permit
$3,681.00 $3,806.00 $3,898.00 $3,994.00
Variance $4,671.00 $4,830.00 $4,947.00 $5,068.00
Engineering Development Review Service Fee $1,351.00 $1,397.00 $1,431.00 $1,466.00 Minor Residential Development (see #151) $2,243.00 $2,319.00 $2,375.00 $2,434.00 Agricultural Preserve Withdrawal $3,810.00 $3,940.00 $4,035.00 $4,134.00 Home Occupation Permit $155.00 $160.00 $164.00 $168.00
Accessory Dwelling Unit $1,340.00 $1,386.00 $1,419.00 $1,454.00 Lot Line Adjustment (DRC Approval) $2,128.00 $2,200.00 $2,254.00 $2,309.00 Engineering Development Review Service Fee $3,571.00 $3,692.00 $3,782.00 $3,875.00 4 Lots or Less (DRC Approval) $8,575.00 $8,867.00 $9,081.00 $9,304.00 Engineering Development Review Service Fee $3,960.00 $4,095.00 $4,194.00 $4,297.00 4 Lots or Less (as part of a Planned Development) (DRC
Approval)
$3,541.00 $3,661.00 $3,750.00 $3,842.00
Engineering Development Review Service Fee $4,153.00 $4,294.00 $4,398.00 $4,506.00 5 Lots or More $9,660.00 $9,988.00 $10,230.00 $10,481.00 Engineering Development Review Service Fee $5,115.00 $5,289.00 $5,417.00 $5,550.00 5 Lots or More (as part of a Planned Development) (DRC
Approval)
$4,152.00 $4,293.00 $4,397.00 $4,505.00
Engineering Development Review Service Fee $5,118.00 $5,292.00 $5,420.00 $5,553.00 Lot Merger and Reversion to Acreage (DRC Approval) $1,055.00 $1,091.00 $1,117.00 $1,145.00 Engineering Development Review Service Fee $3,570.00 $3,691.00 $3,781.00 $3,873.00 Condominium $7,445.00 $7,698.00 $7,884.00 $8,078.00
Condominium (as part of a Planned Development) $3,541.00 $3,661.00 $3,750.00 $3,842.00 Certificate of Compliance (DRC Approval) $3,076.00 $3,181.00 $3,257.00 $3,337.00 Engineering Development Review Service Fee $2,219.00 $2,294.00 $2,350.00 $2,408.00 VTM applications that require Town Council approval,
Subdivision and/or DRC applications that require
Planning Commission approval. This fee supplements the
above-established fees.
$2,824.00 $2,920.00 $2,991.00 $3,064.00
Push Cart Permit $492.00 $509.00 $521.00 $534.00
Auto Dealer Events Smaller Promotional Events $82.00 Smaller Promotional Events $85.00 Smaller Promotional Events $87.00 Smaller Promotional Events $89.00 Large Promotional Events $401.00 Large Promotional Events $415.00 Large Promotional Events $425.00 Large Promotional Events $435.00 News rack Permit Fee $390.00 $403.00 $413.00 $423.00
Draft Initial Study Review Fee (or actual cost if part of a Planned Development, General Plan and/or Town Code
Amendment
$2,786.00 $2,881.00 $2,950.00 $3,023.00
Engineering Development Review Service Fee $1,931.00 $1,997.00 $2,045.00 $2,095.00 Administrative Land Use Permit
Other Zoning Approvals Fees
Subdivisions
Miscellaneous Application Fees
Environmental Assessment Fees

Page 287 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments Fee to appeal Planning Commission decision to Town
Council
Per Residential $438.00 Per Residential $453.00 Per Residential $464.00 Per Residential $475.00 Per Commercial, multi-family or
tentative map $1,763.00
Per Commercial, multi-family or
tentative map $1,823.00
Per Commercial, multi-family or
tentative map $1,867.00
Per Commercial, multi-family or
tentative map $1,913.00
Fee to remand applications from Town Council to
Planning Commission
Fully allocated hourly rate for all
personnel plus additional fees
Fully allocated hourly rate for all
personnel plus additional fees
Fully allocated hourly rate for all
personnel plus additional fees
Fully allocated hourly rate for all
personnel plus additional fees
Fee to appeal Director of Community Development or
Development Review Committee decision to Planning
Commission
Per Residential $221.00 Per Residential $229.00 Per Residential $234.00 Per Residential $240.00 Per Commercial $882.00 Per Commercial $912.00 Per Commercial $934.00 Per Commercial $957.00 Tree appeals $90.00 $93.00 $95.00 $98.00
Basic Zoning Letter $155.00 $160.00 $164.00 $168.00
Legal non-conforming verification $650.00 $672.00 $688.00 $705.00 Reconstruction of legal non-conforming structures
(Burndown Letter)
$276.00 $285.00 $292.00 $299.00
Fence Height Exceptions $276.00 $285.00 $292.00 $299.00 Application Fee $490.00 $507.00 $519.00 $532.00
$20,000.00 to $80,000.00 $3,100.00 plus 9% of valuation $3,205.00 plus 9% of valuation $3,283.00 plus 9% of valuation $3,364.00 plus 9% of valuation Greater than $80,000 $8,500.00 plus 8.5% valuation $8,789.00 plus 8.5% valuation $9,002.00 plus 8.5% valuation $9,223.00 plus 8.5% valuation $20,000.00 to $80,000.00 $1,500.00 plus 6.5% of valuation $1,551.00 plus 6.5% of valuation $1,589.00 plus 6.5% of valuation $1,628.00 plus 6.5% of valuation Greater than $80,000.00 $5,400.00 plus 4.0% of valuation $5,584.00 plus 4.0% of valuation $5,719.00 plus 4.0% of valuation $5,859.00 plus 4.0% of valuation Encroachment Permit - Residential Work up to $4,000.00 - $305.00 Work up to $4,000.00 - $315.00 Work up to $4,000.00 - $323.00 Work up to $4,000.00 - $331.00 Each additional $2,000.00 - $160.00 Each additional $2,000.00 - $165.00 Each additional $2,000.00 - $169.00 Each additional $2,000.00 - $174.00 Encroachment Permit - Collector/Arterial Streets** Work up to $4,000.00 - $1,580.00 Work up to $4,000.00 - $1,634.00 Work up to $4,000.00 - $1,673.00 Work up to $4,000.00 - $1,714.00 Each additional $2,000.00 - $345.00 Each additional $2,000.00 - $357.00 Each additional $2,000.00 - $365.00 Each additional $2,000.00 - $374.00 Temporary Encroachment Permit $150.00 $155.00 $159.00 $163.00 Dumpster Permit $150.00 $155.00 $159.00 $163.00
Storage Permit $150.00*** $155.00*** $159.00*** $163.00*** Inspection Fee - Grading Permits Single Family Residential $730.00 Single Family Residential $755.00 Single Family Residential $773.00 Single Family Residential $792.00 Commercial or Multi Family Residential
$1,135.00
Commercial or Multi Family Residential
$1,174.00
Commercial or Multi Family Residential
$1,202.00
Commercial or Multi Family Residential
$1,231.00
Inspection Fee - Encroachment Permits and Some
Storage Permits
Single Family Residential $200.00 Single Family Residential $207.00 Single Family Residential $212.00 Single Family Residential $217.00 Commercial or Multi Family Residential
$325.00
Commercial or Multi Family Residential
$336.00
Commercial or Multi Family Residential
$344.00
Commercial or Multi Family Residential
$353.00
Plus $485.00 per LID facility Plus $501.00 per LID facility Plus $514.00 per LID facility Plus $526.00 per LID facility Inspection of Storm Water Treatment Measures $500.00 per facility $517.00 per facility $530.00 per facility $543.00 per facility Annual Stormwater/Limited Impact Development (LID)
Permit
Per Visit and 1st facility inspection
$485.00
Per Visit and 1st facility inspection
$501.00
Per Visit and 1st facility inspection
$514.00
Per Visit and 1st facility inspection
$526.00
Every additional facility inspection
$160.00
Every additional facility inspection
$165.00
Every additional facility inspection
$169.00
Every additional facility inspection
$174.00
Work In or Use of Public Right of Way
NPDES
Appeals
Zoning Research
Other Planning Division Fees
Engineering Plan Check Fee
Inspection Fee

Page 288 ends

Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments 1-4 lots $2,855.00* $2,952.00* $3,023.00* $3,098.00*
5 or more lots $3,995.00* $4,131.00* $4,231.00* $4,335.00* Staff Review Fee $664.00 plus 10% of the traffic
consultant report cost
$687.00 plus 10% of the traffic
consultant report cost
$703.00 plus 10% of the traffic
consultant report cost
$720.00 plus 10% of the traffic
consultant report cost
Site Distance Analysis $178.00 per review not to exceed two hours. Actual cost for staff time when
analysis exceeds two hours.
$184.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.
$189.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.
$193.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.

Traffic Impact Mitigation Fee $958.00 per new average daily trip generated
$991.00 per new average daily trip
generated
$1,015.00 per new average daily trip
generated
$1,039.00 per new average daily trip
generated
Development Projects Single family lots Section 24.60.035(b) (3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,228.00/ac.

Single family lots Section 24.60.035(b)
(3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,372.00/ac.

Single family lots Section 24.60.035(b)
(3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,477.00/ac.

Single family lots Section 24.60.035(b)
(3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,587.00/ac.

Multiple family dwelling units - initial
unit $4,228.00/ac.

Multiple family dwelling units - initial
unit $4,372.00/ac.

Multiple family dwelling units - initial
unit $4,477.00/ac.

Multiple family dwelling units - initial
unit $4,587.00/ac.

Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $159.00
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $164.00
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $168.00
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $173.00
Commercial, industrial, hospitals,
churches, schools, and others
$5,286.00/ac.

Commercial, industrial, hospitals,
churches, schools, and others
$5,466.00/ac.

Commercial, industrial, hospitals,
churches, schools, and others
$5,598.00/ac.

Commercial, industrial, hospitals,
churches, schools, and others
$5,735.00/ac.

House Moving Fee $3,490.00* $3,609.00** $3,696.00** $3,787.00** New Buildings and Additions Residential (per square foot added) $1.17/sq.ft.*
Residential (per square foot added)
$1.19/sq.ft.*
Residential (per square foot added)
$1.26/sq.ft.*
Residential (per square foot added)
$1.32/sq.ft.*
Non-residential (per square foot added)
$1.17/sq.ft.*
Non-residential (per square foot added)
$1.19/sq.ft.*
Non-residential (per square foot added)
$1.26/sq.ft.*
Non-residential (per square foot added)
$1.32/sq.ft.*
Engineering Reversion to Acreage $2,395.00 plus initial deposit of $2,500 for surveyor
$2,476.00 plus initial deposit of $2,500
for surveyor
$2,536.00 plus initial deposit of $2,500
for surveyor
$2,599.00 plus initial deposit of $2,500
for surveyor
Engineering Lot Merger $3,480.00 plus surveyor deposit $3,598.00 plus surveyor deposit $3,685.00 plus surveyor deposit $3,776.00 plus surveyor deposit Engineering Lot Line Adjustments $3,480.00 plus surveyor deposit $3,598.00 plus surveyor deposit $3,685.00 plus surveyor deposit $3,776.00 plus surveyor deposit Certificate of Compliance $3,480.00 plus surveyor deposit $3,598.00 plus surveyor deposit $3,685.00 plus surveyor deposit $3,776.00 plus surveyor deposit Abandon Excess Public Right-of-Way & Public Easement $4,345.00 plus surveyor and valuation consultant and planning services
$4,493.00 plus surveyor and valuation
consultant and planning services
$4,601.00 plus surveyor and valuation
consultant and planning services
$4,714.00 plus surveyor and valuation
consultant and planning services
Separate Instrument Dedication Fee (for dedication via
grant deeds and not maps)
$720.00 plus initial deposit of $2,500
for surveyor
$744.00 plus initial deposit of $2,500
for surveyor
$762.00 plus initial deposit of $2,500
for surveyor
$781.00 plus initial deposit of $2,500
for surveyor
Traffic Impact Analysis or Parking Study
Storm Drainage Fees
Hauling Permits
Construction Activities Mitigation Fee
Other Engineering Fees
Engineering Subdivision Map Checking

Page 289 ends

Fee Name FY 2019/20 Adopted FY 2022/23 Proposed
Community Benefit No standard schedule, as offered and
applied per project
Delete Fee
Public Art In-Lieu Fee N/A 1% of building permit valuation Two-Unit Housing Development N/A $1,340.00
Urban Lot Split N/A $1,340.00
Administrative Fee N/A 10% of Development Fees
Sidewalks $16.00/sq.ft. $20.00/sq.ft.

Curb and Gutter $68.00/lf. $100.00/lf.

Tree Removal Permit Application One Tree $250.00
Additional Tree $125.00/each
If application is denied 50% refund
Initial Application for each Therapist $213.00 Delete Fee Annual Renewal for each Therapist $107.00 Delete Fee
Massage Permit Fees
FY 2022/23 Fee Adjustments, Reclassifications, Deletions and Additions General Development Fees
Tree Related Fees
Add a note that fee will be waived when
tree removal is done to implement or
maintain Defensible Space

Page 290 ends

RESOLUTION 2022-

RESOLUTION OF THE TOWN COUNCIL

OF THE TOWN OF LOS GATOS
CONTINUING DEPARTMENT FINES, AND AMENDING CERTAIN FINES FOR FY 2022/23 WHEREAS, per resolution 2004-97 penalties for violation of the Los Gatos Town Code shall be set forth in a schedule; and
WHEREAS, the last update of the Town of Los Gatos Comprehensive Fine Schedule was adopted on March 19, 2019; and
WHEREAS, those fines currently in effect will remain in effect without interruption, and certain of these shall be increased to reflect best municipal practices.

NOW, THEREFORE, THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES HEREBY RESOLVE:

1. That Resolution 2019-011, “Resolution of the Town Council of the Town of Los Gatos Continuing Department Fines, Amending Certain Fines for FY 2019/20” is hereby rescinded; and

2. The Town of Los Gatos Comprehensive Fine Schedule, attached hereto as Exhibit A, shall become effective July 1, 2022.

ATTACHMENT 5

Page 291 ends

PASSED AND ADOPTED at a regular meeting of the Town Council held on the 15th day of March 2022 by the following vote:

COUNCIL MEMBERS:

AYES:

NAYS:

ABSENT:

ABSTAIN:

SIGNED:

MAYOR OF THE TOWN OF LOS GATOS

LOS GATOS, CALIFORNIA
DATE: __________________
ATTEST:

TOWN CLERK OF THE TOWN OF LOS GATOS

LOS GATOS, CALIFORNIA
DATE: __________________

Page 292 ends

C A L I F O R N I A
Tow n o f L o s G ato s
Comprehensive Fine Schedule
Fiscal Year 2022/23
ATTACHMENT 5, EXHIBIT A

Page 293 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule

TABLE OF CONTENTS
Town Code Violations............................................................................................................ 1 Los Gatos California Fire Code................................................................................................ 5

Page 294 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 1 FINES/PENALTIES – TOWN CODE VIOLATION
Per resolution 2004-97 penalties for violation of the Los Gatos Town Code shall be set forth as the below schedule, except:

The penalties for all violations of the Town Code not specifically set forth in the below schedule and do not involve violations of local building and safety codes shall be:

1. one hundred dollars ($100) for first violation;

2. two hundred and fifty dollars ($250) for second violation;

3. five hundred dollars ($500) for each additional violation within one year.

The penalties for all violations of the Town Code not specifically set forth in the below schedule and that involve violations of local building and safety codes and are not otherwise designated as misdemeanors shall be:

1. one hundred dollars ($100) for first violation;

2. five hundred dollars ($500) for second violation within one year;

3. one thousand dollars ($1,000) for each additional violation within one year.

The penalties for all knowing and willful violations of the Town Code shall be:

1. five hundred dollars ($500) for first violation;

2. one thousand dollars ($1,000) for each additional violation within thirty-six month thereafter.

For all California Vehicle Code violations, please contact the Superior Court of California County of Santa Clara.

Page 295 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 2 FINES/PENALTIES – TOWN CODE VIOLATION

1.30.025(c) 100% of fine

4.10.030(a) $150.00

4.10.030(c) $500.00

4.10.075
First offense $100.00
Second offense within 2 years $200.00
Third subsequent offense within 2 years $500.00

4.40.005 $100.00

4.40.015 $250.00

4.40.020 $250.00

4.80.050 $100.00

6.20.155 $50.00

6.40.010 $100.00

6.80.010 $100.00

9.30.015 $100.00

11.40.060 $200.00

11.40.060
$100.00
$200.00
$500.00

13.20.010 $100.00

13.20.885 $100.00

14.40.105 $100.00

14.100.020(a) $100.00

14.140.085
First offense Warning
Second offense $250.00
Third offense within 12-month period incurs fine and immediate revocation of the short-term rental license $500.00

15.10.025 Roller skating in street $100.00

15.10.030 Skateboarding or roller skating $100.00

15.10.035 Driving on private property $100.00

15.30.035 Entering intersections, etc., without sufficient space on other side $135.00

15.30.115 Cruising
First offense $100.00
Second offense $200.00
Third or subsequent offense within 2 years $250.00

15.40.015 Overtime Parking $42.00

15.40.060 Sleeping in vehicle after being warned $50.00

15.40.065 Vehicle Storage on Street $67.00

15.40.070 Commercial Vehicles in Residential Zones $67.00

15.40.075 For Sale/Non Emergency Repair $42.00

15.40.080 Preferential Parking $52.00

15.40.080(b) Permit Required Area $52.00

15.40.080(c) Fraudulent use of Permit $107.00
Improper storage of hazardous material
Hazardous material
Peddlers / Solicitors
Special event
Restraint of Dogs
Vaccination of dogs and cats
Registration of dangerous dogs
Penalty, abatement
Building permit requirements
Order to vacate or abate
Late Payment of Fines/Penalties
Animal bites, failure to report
Quarantine violation
Animals and Vehicles
Short-term rentals
Order to vacate
Storage of certain substances (populated area)
Illegal dumping (outside park)
Single use carry-out bags
First violation
Second violation within 1year
For each additional violation within 1 year

Page 296 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 3 FINES/PENALTIES – TOWN CODE VIOLATION

SECTION AMOUNT

15.40.085 Posted no Parking Special Events $42.00

15.40.090 Parking on Parkway $42.00

15.40.095 Marked Parking Space $42.00

15.40.100 Parking on Grade $42.00

15.40.105 Designated Parking VC22507.8 $292.00

15.40.110 Marked Curb $42.00

15.40.275 Parking in Alleys Restricted to Loading or Unloading $42.00

15.50.015 Use of crosswalk by pedestrian $25.00

15.50.020 Pedestrian other than right angle $25.00

15.50.025 Standing in roadway $25.00

16.20.010 Curfew noise disturbance $500.00

16.20.015 Exterior noise levels for residential zones $500.00

16.20.020 Exterior noise levels for multi-family residence $500.00

16.20.025 Noise levels for commercial / industrial zones $500.00

16.20.030 Public property noise limits $500.00

16.20.035 Construction $500.00

16.20.040 Amplified sound $500.00

16.20.045 Street sales $500.00

16.20.050 Animals and birds
First offense $50.00
Second offense within 2 years $200.00
Third or subsequent offense within 2 years $500.00

16.20.055 Motor vehicles $500.00

16.20.060 Powered equipment $500.00

16.30.010 Noise limits $500.00

18.10.015(a) Drinking in public $100.00

18.10.015(b) Open container in public $100.00

18.10.020 Meetings (disturbing) $100.00

18.10.025(2) Enter / remain in public while intoxicated $100.00

18.30.010(a) Minor possession alcohol at social gathering $100.00

18.30.010(b) Party host allow minor possession of alcohol $500.00

18.30.055 Adults, responsibility for juvenile $500.00

18.50.010 Crowds, dispersement $100.00

18.70.010 Discharge of firearm, etc. in Town $200.00

18.70.035 Sling shot $200.00

19.10.020(1)-(5) Certain acts prohibited within park property $100.00

19.10.025(1)-(5) Behavior of persons within park property $100.00

19.10.025(6) Possess or ignite explosive, fireworks, rockets, etc $200.00

19.10.025(7) Make or kindle a fire except in approved locations $100.00

19.10.025(8)-(17) Behavior of persons within park property $100.00

19.10.027(1) Animals in Parks – Dogs off leash $100.00

19.10.027(2)-(6) Animals in parks – Other provisions $100.00

19.10.030(1)-(2) Sanitation requirements $100.00

19.10.035(1)-(9) Use of vehicles in parks (not subject to CVC or other Town Codes) $100.00

OFFENSE

Page 297 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 4 FINES/PENALTIES – TOWN CODE VIOLATION

SECTION AMOUNT

19.10.037(1)-(6) Use of bicycles in parks (not subject to CVC or other Town Codes) $100.00

19.10.037(1)-(6) Use of skateboards, skates, scooters $100.00

19.10.040 Swimming or wadings in parks $100.00

19.10.050(1)-(3) Advertising, sale of merchandise in parks $100.00

19.10.055(1)-(2) Closing hours for parks, overnight activities prohibited $100.00

19.10.060 Closing sections of park $100.00

22.30.040 Storm water protections $100.00

28.20.030 Non-permit fine Taxicabs $100.00

OFFENSE

Page 298 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 5 FINES/PENALTIES – LOS GATOS CALIFORNIA FIRE CODE

SECTION OFFENSE AMOUNT
106.2.1 Failure to obtain inspection-new installation $200.00 109.3.2 Failure to comply with notice I order $1,000.00 109.3.4 Destruction of signs - Unauthorized Tampering $200.00 301.1 Fire hazard prohibited (citations) $100.00
110 Unsafe buildings $200.00
401.8 Interference with Fire Department $200.00
105.1. 1 Unlawful to operate institutions without occupancy permit $200.00 503.2 Plans for access roads $100.00
507.5 Plans for fire hydrant systems $100.00
501.4 Access road and fire hydrant installation timing $100.00 507 Hydrant identification-reflective markers $100.00
505 Premises identification $100.00
901.6 Fire protection in recreational vehicle and mobile home parks $100.00 503.4 Closure of fire roads; obstruction-access road $200.00 504.2 Posting of signs on exterior doors blocked by storage $100.00 506.1 Key box $100.00
901.7 Notification of Fire Department for fire alarm servicing $100.00 901.8 Tampering with fire equipment $200.00
901.8 Tampering with fire hydrant or fire equipment $200.00 901.8.1 Tampering with barriers, etc. $200.00
507.5.4 Obstructing fire protection equipment $100.00
507.5.5 Clear space around hydrants $100.00
509.2 Fire extinguishing equipment obstruction $100.00
509.2 Fire alarm equipment obstruction $100.00
509.1 Identification of fire protection equipment $100.00 906 Sale of defective fire extinguishers $200.00
907 Fire alarm systems $200.00
307.1 Open burning $100.00
307.4.1 Bonfires $100.00
304.1.1 Accumulation of waste material $150.00
315.1 Storage and handling of readily combustible materials $100.00 315.3.4 Combustible storage in attics $100.00
807.1 Decorative material $100.00
801 Atrium furnishings $150.00
603.9 Protection of gas meters $100.00
603 Heating appliances $100.00
308 Use of open flame restricted $100.00
305.2 Discarding burning objects $100.00
305.2 Hot ashes and other dangerous materials $100.00
311.1 Vacant building (maintenance) $100.00
1003.6 Exit obstruction $200.00

Page 299 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 6 FINES/PENALTIES – LOS GATOS CALIFORNIA FIRE CODE

SECTION OFFENSE AMOUNT
1010.1 Exit doors $200.00
1013 Exit illumination $200.00
1008.1 Lighting requirements-exit $200.00
3309 Reporting of fires $100.00
202 False alarms $100.00
1018.1 Aisles $150.00
1024.1 Use of exit ways $200.00
1013.1 Marking and lighting of exits $150.00
107.6 Overcrowding $200.00
308.1 Open flame $100.00
2311.2 Storage and use of flammable and combustible liquids in repair garages
$100.00
2311.2.3.1 Liquids drained from vehicles $150.00
2311.3 Source of ignition $100.00
2311.2.2 Oily waste materials $100.00
2803.1 Open yard storage $100.00
2803.2 Dust control $100.00
3103.8 Location of tents and air-supported structures $100.00 3103.9 Anchorage required $100.00
3104.2 Flame-retardant treatment $200.00
3104.12/13 Fire extinguishers and other fire protection equipment $100.00 3104.14 Occupant load $100.00
3103.12 Exits / Means of Egress $100.00
3103.12.8 Maintenance of exit ways $100.00
3103.12.7 Exit illumination $100.00
3104.6 Smoking $100.00
3104.7 Open Flame $100.00
3104.15 Heating and cooking equipment $100.00
3104.17.2 Storage of flammable or combustible liquid $150.00 3104.19 Generators $100.00
2108.1 Fire protection $100.00
2107.3 Solvent storage $100.00
2105.1.5.4 Public access Customer area $100.00
2105.1.1 Warning label and signs $50.00
2403.2.6 Smoking prohibited $100.00
2403.2.7 Welding warning signs $100.00
2403.2.1 Electrical wiring and equipment $100.00
2404.2 Location of spray-finishing operations $200.00
2404.3.2 Spray booths $100.00
2404.6.1.2 Dry filters – Drying Apparatus $100.00
2404.6 Sources of ignition $150.00

Page 300 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 7 FINES/PENALTIES – LOS GATOS CALIFORNIA FIRE CODE

SECTION OFFENSE AMOUNT
2404.7 Ventilation of spray booths and spraying areas $100.00 2404.9 Limited spraying areas $50.00
2403.3 Storage and handling of flammable or combustible liquids $75.00 2404.4 Fire protection equipment $50.00
2404.5 Operation and maintenance $50.00
2404.6.1.2 Drying apparatus $50.00
2405.2 Location of dip tank operations $150.00
2405.7 Ventilation of vapor areas $100.00
2405.6 Sources of ignition $150.00
2405.4.1 Fire extinguishing equipment $100.00
2405.3.4 Dip tank covers $100.00
2405.9 Hardening and tempering tanks $100.00
2405.11 Coating operations $100.00
2407 Electrostatic apparatus $150.00
2408 Organic peroxides and dual-component coatings $100.00 2408.5 Source of ignition $100.00
5906.5.7 Fire extinguishing materials $100.00
5906.1 Handling of magnesium fines (fine magnesium scrap) $100.00 202 Hot work area $100.00
202 Location of cylinders $100.00
2905 Process building $100.00
2909 Storage of raw material and finished products $100.00 2906 Process mills, mixers and kettles $100.00
2904.1 Electrical equipment $100.00
2904.3 Protection against static electricity and lighting $100.00 2903.4 Fire protection $100.00
2901.3 Maintenance $100.00
2703.1 Emergency control station and alarms $100.00
2703.2.3 Piping and tubing $100.00
2703.4 Emergency plan $100.00
2703.13 Gas detection $100.00
2703.10 Fire protection $100.00
2703.15.1 Electrical equipment $100.00
2703.15.2 Ventilation requirements $100.00
2704 General storage requirements $100.00
2704.3.1 Inside HPM storage $100.00
2704.3.3 Separation of HPM $100.00
2705.3 Handling HPM in existing buildings $100.00
2705.3 Requirements for HPM gases $100.00
2705.3.2 Transportation of HPM in service corridors $100.00 2705.3.4 Design of carts and trucks $100.00

Page 301 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 8 FINES/PENALTIES – LOS GATOS CALIFORNIA FIRE CODE

SECTION OFFENSE AMOUNT
2303.1 Location of dispensing operations $100.00
2303.1 Installation of dispensing devices $100.00
2304.1 Supervision of dispensing operations $100.00
2305.4 Sources of ignition $100.00
2305.6 Signs $100.00
2305.5 Fire protection $100.00
2305.7 Clearance of combustibles $100.00
2305.2 Maintenance $100.00
2306.2 Storage of fuel $100.00
2306.7 Dispensing $100.00
2301.5 Electrical equipment $100.00
2301.6 Heating equipment $100.00
2305.5 Fire protections $100.00
2306.7.9 Vapor recovery $100.00
2307.3 Attendants $100.00
2307.4 LPG dispensing location $100.00
2307.5 LPG dispensing equipment $100.00
2308.3 Location for CNG dispensing operations $100.00
2308.4 Private fueling of vehicles $100.00
2308.6 Manual shut off valve $100.00
2308.8 Discharge of CNG from vehicle fuel containers $100.00 3003.1 Ventilation $100.00
606.12.5 Ammonia discharge $100.00
606.7 Emergency signs and labels $100.00
5303.1 Compressed gas containers, cylinders and tanks $100.00 5303.4 Marking $100.00
5303.5 Security $100.00
5303.6 Valve protection $100.00
5303.7 Separation from hazardous conditions $100.00
5303.8 Wiring and equipment $100.00
5303.9 Service repair $100.00
5303.10 Unauthorized use $100.00
5303.11 Exposure to fire $100.00
5303.12 Leaks, damage or corrosion $100.00
5303.13 Surface or unprotected storage areas $100.00
5303.15 Lightning $100.00
5304 Storage $100.00
5305 Use and handling $100.00
5306 Medical gas systems $100.00
5503.1 Construction of containers $100.00
5503.1 Containers $100.00

Page 302 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 9 FINES/PENALTIES – LOS GATOS CALIFORNIA FIRE CODE

SECTION OFFENSE AMOUNT
5503.2 Pressure relief devices $100.00
5503.4 Marking $100.00
5503.60 Electrical equipment $100.00
5505.1.2 Piping materials and construction $100.00
5505.4 Piping materials and construction $100.00
5505.5 Handling $100.00
2203.2 Housekeeping $100.00
2203.1 Smoking and open flames $100.00
5701.4 Permit and plans for flammable and combustible liquid storage electrical $100.00
5703.2 Fire protection $100.00
5703.4 Spill control and secondary containment $100.00
5703.5 Labeling and signs $100.00
5704.2.1 Change of tank contents $100.00
5704.2.3 Labeling and signs $100.00
5704.2.4 Sources of ignition $100.00
5704.2.5 Explosion control $100.00
5704.2.6 Separation from incompatible materials $100.00 5704.2.7 Design of tanks, containers and equipment $100.00 5704.2.8 Below grade vaults $100.00
5704.2.7.6 Inspection, repair, alteration or reconstruction of tanks and piping $100.00
5704.2.8.2 Seismic design $100.00
5704.2.7.3 Tank vents for normal venting $100.00
5704.2.9.6.1 Prohibited locations of above ground tanks $200.00 5704.2.9.6.2 Separation of tanks $100.00
5704.2.7.4 Emergency of relief venting for tanks $100.00 5704.2.7.5 Tank openings other than vents $100.00
5704.2.10 Drainage control and diking $100.00
5704.3 Container and portable tank storage outside of buildings $100.00 5704.2.9.5 Stationary above ground tank storage inside buildings $100.00 5704.3.3 Container and portable tank storage inside buildings $100.00 5704.2.11 Underground tank storage $100.00
5705.2 Liquid transfer $100.00
5705.3.6 Cleaning with Class I or II liquids $150.00
5706.2 Storage and dispensing at construction sites $100.00 5706.2.8 Tank vehicles and vehicle operation $100.00
5001.5 Permits required for hazardous materials $200.00 5001.5.1 Hazardous material management $100.00
5003.2.1 Design of containers, cylinders and tanks $100.00 5003.2.2 Piping, tubing, valves and fittings $100.00

Page 303 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 10 FINES/PENALTIES – LOS GATOS CALIFORNIA FIRE CODE
5003.2.3 Suitability of equipment $100.00
5003.2.4 Installation of tanks $100.00
5003.2.5 Empty containers and tanks $100.00
5003.2.6 Maintenance $100.00
5003.3 Release of hazardous material $1,000.00
5003.4 Material safety data sheets $100.00
5003.5 Identification signs $100.00
5003.6 Signs $100.00
5003.7 Sources of ignition $100.00
5003.8 Construction requirement $100.00
5003.9 General safety precautions $100.00
5003.10 Handling and transportation $100.00
5001.6 Facility closure $100.00
5001.4 Retail and wholesale storage and display $100.00 5001.1 Exempt amounts $100.00
5004 Storage, general $100.00
6004 Toxic and highly toxic compressed gases $100.00
6303 Oxidizers $100.00
6203 Organic peroxides $100.00
6403 Pyrophoric materials $100.00
6703 Water relative solids and liquids $100.00
6003 Highly toxic and toxic solids and liquids $100.00
6603 Radioactive materials $100.00
5403 Corrosives $100.00
5005.1.1 Separation from hazardous material storage $100.00 5004.2 Spill control $100.00
5005.1.5 Emergency power $100.00
5005.1.6 Supervision $100.00
5005.1.7 Lighting $100.00
5005.1.8 Fire extinguishing systems $100.00
5005.1.9 Ventilation $100.00
5304.1 Container position for gases $100.00
NFPA 55 Bulk oxygen systems $100.00
NFPA 55 Liquid transfer $100.00
6405.3 Silane $100.00
5005.2 Indoor dispensing and use $100.00
5005.3 Outdoor dispensing and use $100.00
5005.4 Handling $100.00
3205.2 Ignition sources $100.00
3205.4 Aisle maintenance $100.00
3206.3 Separation of high-piled storage areas $100.00

Page 304 ends

Town of Los Gatos FY 2022-2023 Comprehensive Fine Schedule 11 FINES/PENALTIES – LOS GATOS CALIFORNIA FIRE CODE
3206.4 Fire sprinklers $100.00
3206.5 Fire detection $100.00
3206.6 Building access $100.00
3206.7 Smoke and heat removal $100.00
3206.8 Hose stations and hose connections $100.00
3206.9 Aisles $100.00
3206.10 Portable fire extinguishers $100.00
3207.2 Fire protection for solid-piled and shelf storage $100.00 3207.3 Pile dimensions and height limitations $100.00
3208.2 Fire protection for rack storage $100.00
3208.3 Flue spaces $100.00
3208.5 Extra-high rack storage systems $100.00
6103 Installation of equipment $100.00
6104 Location of containers $100.00
6105 Prohibited use of Lp-gas $100.00
6106 Dispensing $100.00
6107 Safety devices $100.00
6107.2 Smoking and other sources of ignition $100.00
6107.3 Clearance to combustibles $100.00
6107.4 Protecting containers from vehicles $100.00
6108 Fire protection $100.00
6109 Storage of portable containers awaiting use or resale $100.00 6110 Containers not in service $100.00
6111 Parking and garaging tank vehicles $100.00
4811.6 Smoking $100.00
6504 Film storage $100.00
605.9 Use of temporary wiring $100.00
605.1 Abatement of electrical hazards $100.00
605.8 Electrical motors $100.00
605.5 Extension cords $100.00
605.4 Multi plug adaptors $100.00
605.4.1 Power taps $100.00
605.3 Access to switchboards and panel boards $100.00
3301 Fire safety during construction $100.00
3304 Precautions against fire $100.00
5104 Storage of aerosol products $100.00
5106 Retail display of aerosol products $100.00

Page 305 ends

PREPARED BY: Shelley Neis
Town Clerk
Reviewed by: Town Manager, Assistant Town Manager, and Town Attorney 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov

TOWN OF LOS GATOS

COUNCIL AGENDA REPORT
MEETING DATE: 03/15/2022
ITEM NO: 13
DATE: March 7, 2022
TO: Mayor and Town Council
FROM: Laurel Prevetti, Town Manager
SUBJECT: Adopt the Council Policy Committee’s Recommendation to Retain the Current Style of Study Session Action Minutes
RECOMMENDATION:

Adopt the Council Policy Committee’s recommendation to retain the current style of Study Session action minutes.

DISCUSSION:

At the Town Council’s direction, the Council Policy Committee discussed the style of study session minutes at its February 14th meeting.

No public comment was received and after Committee discussion, the Committee unanimously moved to forward to the Town Council the recommendation to retain the current style of study session action minutes. The recommendation was based primarily on the fact that this is the most common approach taken by local jurisdictions (see Attachment 1 for the report to the Council Policy Committee).

COORDINATION:

The preparation of this report was coordinated with the Town Manager’s Office.

FISCAL IMPACT:

None.

ENVIRONMENTAL ASSESSMENT:

This is not a project defined under CEQA, and no further action is required.

Page 306 ends

PAGE 2 OF 2
SUBJECT: Adopt the Council Policy Committee’s Recommendation to Retain the Current Style of Study Session Action Minutes
DATE: March 7, 2022
Attachments:

1. Council Policy Committee February 14, 2022 Staff Report

Page 307 ends

PREPARED BY: Shelley Neis
Town Clerk
Reviewed by: Town Manager, Assistant Town Manager, and Town Attorney 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov

TOWN OF LOS GATOS

COUNCIL POLICY COMMITTEE REPORT
MEETING DATE: 02/22/2022
ITEM NO: 2
DATE: February 14, 2022
TO: Council Policy Committee
FROM: Laurel Prevetti, Town Manager
SUBJECT: Discuss and Recommend to the Town Council Retaining the Current Style of Study Session Minutes
RECOMMENDATION:

Discuss and recommend to the Town Council retaining the current style of Study Session minutes.

BACKGROUND:

At the December 21, 2021 Town Council meeting, Council requested the Policy Committee review the current style and format of Study Session minutes.

DISCUSSION:

The Policy Committee and Town Council have previously discussed the style of minutes on several occasions, most recently in 2013. On each occasion, the Policy Committee and Town Council have confirmed the use of action minutes.

The three primary reasons for action minutes are: 1) complete video records of Council meetings are available on DVDs and on the Town’s website; 2) the actions taken and directions given by Council are required for minutes, and Council and staff’s oral remarks are not; and 3) staff time to produce the current form of minutes is considerable (8 to 12 hours per typical meeting, plus additional time for management review) primarily due to the time required to summarize Council and staff comments.

Attachment 1 is a matrix that shows the type of minutes the cities in Santa Clara County use, demonstrating that action style minutes are the standard.

Page 308 ends

PAGE 2 OF 2
SUBJECT: Discuss and Recommend to the Town Council Retaining the Current Style of Study Session Minutes
DATE: February 14, 2022
CONCLUSION:

Staff looks forward to the discussion with the Committee.

COORDINATION:

The preparation of this report was coordinated with the Town Manager’s Office.

FISCAL IMPACT:

None.

ENVIRONMENTAL ASSESSMENT:

This is not a project defined under CEQA, and no further action is required.

Attachment:

1. Summary of Style of Minutes Santa Clara County

Page 309 ends

CITY ACTION SUMMARY VERBATIM NOTES
Campbell x
No response from Clerk, but appears to include
some discussion summary
Cupertino x
Action for Council, Planning Commission, Parks &
Rec (televised); summary for other boards and
commissions (non-televised)
Gilroy x
Los Altos x
Los Altos Hills x out sourced due to workload
Los Gatos x
Milpitas x
Monte Sereno x
Morgan Hill x
Mountain View x
Palo Alto
San Jose x
Santa Clara x
Saratoga x
Sunnyvale x
Some discussion summary is included in
Board/Commission/Council Subcommittee minutes.

ATTACHMENT 1

Page 310 ends

PREPARED BY: Greg Borromeo and Jim Renelle
Sergeant Parking Program Manager
Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Police Chief, and Finance Director
110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov

TOWN OF LOS GATOS

COUNCIL AGENDA REPORT
MEETING DATE: 03/15/2022
ITEM NO: 14
DATE: March 9, 2022
TO: Mayor and Town Council
FROM: Laurel Prevetti, Town Manager
SUBJECT: Approve a Wayfinding Design Concept and Discuss Progress on the Downtown Parking Roadmap
RECOMMENDATION:

Approve a Wayfinding Design Concept and discuss progress on the Downtown Parking Roadmap.

BACKGROUND:

On October 19, 2021, the Town Council discussed the progress of the pilot Employee Parking Program. After surveying businesses and employees, additional outreach was conducted, and employees were asked to register in advance for a parking permit. Sufficient information is now available to determine the quantity and locations for the employee parking spaces.

On November 16, 2021, Town staff began work with Hunt Design on the Wayfinding and Signage project. Hunt Design has evaluated the existing conditions, reported back to Town staff with their findings, and created wayfinding design concepts.

This report provides the Council with the choice of wayfinding design concepts and an update on the employee parking program and other Parking Study implementation measures (also known as the Parking Roadmap).

DISCUSSION:

Wayfinding Signage Design Options
Through a series of collaborative meetings with Town staff, Hunt Design has developed scale models of several different styles of wayfinding and destination signage for the Town Council to

Page 311 ends

PAGE 2 OF 6
SUBJECT: Approve Wayfinding Design Concept and Discuss Progress on the Downtown Parking Roadmap.

DATE: March 9, 2022
DISCUSSION (continued):
consider. The designs seek to reflect a style that compliments the brand of Los Gatos while providing visibility that captures the eye of the user. Attachment 1 provides illustrations of the design concepts.

The signs will be designed and presented as “families” of like purpose signs. Once the design concept is approved, Hunt Design would continue to work with Town staff to create a standard for each family of signs. This would include gateway signage, destination arrival signage, parking wayfinding, pedestrian wayfinding, and bicycle wayfinding. Using full-size mockup signs, Hunt Design will work with Town staff to determine the best location available for each wayfinding and parking sign.

Once the Council has selected a design concept, Hunt Design will complete the parking signage which will not only direct drivers to parking spaces from the main streets (wayfinding), but also identify parking lot entrances and uses (such as time zones and employee parking within the parking lots). The fabrication and installation of the parking wayfinding signs will be done by a specialized sign vendor through a separate procurement process. Once the design is complete, Hunt Design will provide cost estimates for the project and staff will recommend a scope that fits within the appropriated budget.

Employee Parking Pilot Update
Over 820 Downtown employees and businesses have been approved for an employee parking permit. While this does not represent every employee, it does provide an adequate number to reasonably estimate the quantity and locations needed for employee parking spaces. Employee parking spaces will essentially replace the unlimited time spaces in many of the municipal lots.

Additionally, a small number of outlying on-street parking spaces will be used for employee parking.

The number of employee spaces for each area is based on the total number of spaces in the lot and the number of nearby employees registering for a parking permit. Also factored into this calculation is the available number of parking spaces during peak parking times. Lots beyond 90% full at peak received a smaller percentage of employee parking spaces. Based on comments received during in-person outreach, employees historically have been parking in significant numbers in the high demand lots and moving their vehicle a few spaces over throughout their shifts to avoid citations. See Attachment 2 for detailed employee space allotments.

Beyond the initial allotment of nearly 500 employee parking spaces, additional employee spaces may be necessary. These additional spaces will have to be carefully allocated and may

Page 312 ends

PAGE 3 OF 6
SUBJECT: Approve Wayfinding Design Concept and Discuss Progress on the Downtown Parking Roadmap.

DATE: March 9, 2022
DISCUSSION (continued):
necessitate expanding employee parking in limited numbers into the adjacent residential permit parking zones. There will be a fine balance between allocating employee spaces to meet demand and allowing ample public spaces. As a result, the possession of an employee permit will not guarantee a parking space and employees will always have the option to park without a permit in the outlying parking lots such as the Northside Lot and the Miles Avenue Lot.

Employee permits will intentionally be oversold as not all employees will be utilizing a space at the same time. Once the initial employee spaces are installed, periodic lot occupancy checks will be conducted to ensure that all spaces are fully utilized. Timely adjustments will be made to avoid creating underutilized spaces. A Re-Parking Prohibition may need to be adopted if employees continue to park in spaces intended for visitors and move their vehicle to another space every few hours to avoid citations. The chart below provides an overview of preliminary space allocations.

Location Current
Timed
Parking
Current
All-Day
Parking
Proposed
Employee
Parking
Proposed
Timed
Parking
Proposed
All-Day
Parking
Other
Spaces
Total
Number
of Spaces
Off-Street 470 549 432 391 196 71 1090
On-Street 571 0 54 517 0 0 571
Total 1051 549 486 908 196 71 1661
Employee Parking Space Signage and Markings
Employee parking spaces need to be clearly identified. It is essential that both downtown employees and visitors understand the parameters for using employee parking spaces. A limited number of traditional pole mounted signs along with painted ground markings will be used to identify employee parking spaces. Striping and lettering the parking lot surfaces behind each employee parking stall allows for reducing the total number of poles and parking signs.

This will reduce both visual clutter and costs. This combination of signage and markings increases the combined effectiveness of the signs and markings.

The employee parking ground markings, parking stall sign fabrication, and installation will be completed by an outside contractor. A Request for a Quotations (RFQ) will be released later this month, and work is expected to be underway shortly thereafter. The Town’s Capital Improvement Program already has funds allocated for this purpose. The completion of the employee parking space work is expected by July 2022. Once the spaces are marked, the employee parking pilot will begin.

Page 313 ends

PAGE 4 OF 6
SUBJECT: Approve Wayfinding Design Concept and Discuss Progress on the Downtown Parking Roadmap.

DATE: March 9, 2022
DISCUSSION (continued):

Paid Parking and Mobile Payment Application
The creation of employee parking spaces will result in the loss of all unlimited time spaces in all downtown municipal parking lots except the Northside Lot and the Miles Avenue Lot, which will remain unchanged. In some lots, unlimited time spaces not used for employee parking will be converted to 3-hour spaces. With the loss of unlimited time spaces in the core downtown lots, the Town will need to establish a Pay-to-Stay protocol so visitors have a means to stay beyond the 3-hour time limit without moving their vehicle. Visitors wishing to stay beyond the free three hours will pay a nominal fee that will allow them stay in their current parking space. The Pay-to-Stay option requires the creation of a paid parking ordinance, the installation of pay stations, and the implementation of a mobile payment application.

Pay stations allowing both electronic and cash forms of payment will be installed in easily accessible locations between Lots 1 through 5 and in Lot 6. This will reduce the amount of pay stations needed to serve the public. To further reduce the project costs and parking lot disruption, pay stations will be specified with solar power and cellular connectivity. This will eliminate the need to trench the area to install power and data service. A Request for Proposals (RFP) will be issued for the procurement and installation of the pay stations by the end of April 2022.

In addition to the pay stations, a mobile payment application will be procured so visitors can conveniently make payments from their phones or similar mobile devices without having to use a pay station. The mobile application would accept both credit and debit cards. It would also provide notification to visitors that their time is about to expire and allow them to add additional time without going back to their vehicle or a physical pay station. An RFP for the mobile payment application will also be released in April 2022.

For the Town of Los Gatos to establish Pay-to-Stay (metered parking), the Town must adopt a Town Ordinance establishing parking fees. The Town Council would consider a draft ordinance prior to implementation of the program. The recommended rate for Pay-to-Stay parking is $1 per hour with a maximum daily rate of $8. This low rate along with the first three hours free should encourage visitors to shop and dine in Downtown Los Gatos. The rate is high enough to encourage employees to participate in the Employee Parking Program and discourage, but not prevent them from using the timed spaces intended for visitors. On-street parking with a time limit of two hours will remain unchanged and not be eligible for the Pay-to-Stay extension.

Page 314 ends

PAGE 5 OF 6
SUBJECT: Approve Wayfinding Design Concept and Discuss Progress on the Downtown Parking Roadmap.

DATE: March 9, 2022
DISCUSSION (continued):

Digital Parking Occupancy Signage
Lot occupancy counting and digital parking space guidance systems are high impact products that will significantly improve the visitor parking experience. These systems help visitors quickly and efficiently find a parking space. Various types of occupancy counting and guidance technologies are currently available, but all require a significant initial capital investment between $750,000 to $2,000,000, including construction costs associated with installations.

Some newer technologies can identify individual space occupancy and the length of stay. Most systems closely integrate with the major Pay-to-Stay payment systems currently on the market.

Some systems also increase the efficiency of enforcement by remotely alerting staff of specific vehicles in violation.

The installation of these systems will cause a significant disruption in the downtown, including removal and replacing of sidewalk to provide conduit and communications infrastructure.

There is an option to incorporate this portion of the program into a future streetscape project.

This has several advantages as it could allow for the parking changes already in play to settle out and could allow for efficiencies during construction of a combined streetscape and digital signage program. This also may allow for parking revenue to accumulate as a source of funds for the project.

If the preference is to move forward sooner, staff could issue an Request for Proposal (RFP) for design of this system later this calendar year. Design is anticipated to take six months. The construction of the project is a public works project, subject to formal bidding requirements and is anticipated to take six to nine months after completion of design and appropriation of funds.

CONCLUSION:

As discussed in this report, a summary of the immediate implementation actions for the Downtown Parking Roadmap are listed in the chart on the next page.

Page 315 ends

PAGE 6 OF 6
SUBJECT: Approve Wayfinding Design Concept and Discuss Progress on the Downtown Parking Roadmap.

DATE: March 9, 2022
CONCLUSION (continued):

Following review of this report, Council should:

1. Select a design from Attachment 1 that will be used for the parking wayfinding and other signage;

2. Discuss the progress of the employee pilot parking program and paid parking; and

3. Provide feedback on next steps for a digital parking occupancy count signage program, including options for project funding.

COORDINATION:

This report was coordinated with the Parks and Public Works Department and the Office of Economic Vitality.

FISCAL IMPACT:

None.

ENVIRONMENTAL ASSESSMENT:

This is not a project as defined under CEQA, and no further action is required.

Attchments:

1. Design Concepts Illustrations (Design Concept A and Design Concept B)

2. Proposed Employee Parking Space Allocation
Task 4
th Qtr. 2021 1st Qtr. 2022 2nd Qtr. 2022 3rd Qtr. 2022
Employee Wait List Completed
Parking Wayfinding In Progress
Other Wayfinding In Progress
Parking Lot Signage RFQ In Progress
Mobile Payment App RFP Target Time
Frame
Pay Station RFP Target Time
Frame
Digital Occupancy Count
Signage RFP
Pending
Council
Direction

Page 316 ends

(Design Concept A)
Attachment 1 (Wayfinding Design Concepts)

Page 317 ends

(Design Concept
B)
Attachment 1 (Wayfinding Design Concepts)

Page 318 ends

Staff Report Attachment 2 Meeting Date: March 15, 2022 Wayfinding Update

TOWN OF LOS GATOS

PROPOSED EMPLOYEE PARKING SPACE ALLOCATION
Current Current Current Current # Employees Proposed Proposed Proposed Proposed Proposed Proposed Location Timed
Spaces
All Day
Spaces
ADA
Spaces
EV
Spaces
Total
Spaces
Registered
for a Permit
Employee
Spaces
Timed
Spaces
All Day
Spaces
ADA
Spaces
EV Spaces Total
Spaces
Off-Street
Lot 1 64 51 5 0 120 169 51 64 0 5 0 120
Lot 2 47 32 4 0 83 102 32 47 0 4 0 83
Lot 3 21 24 2 2 49 67 24 21 0 2 2 49
Lot 4 Upper 151 0 8 2 161 N/A 32 119 0 8 2 161
Lot 4 Lower 0 152 0 0 152 116 152 0 0 0 0 152
Lot 5 96 0 7 2 105 119 16 80 0 7 2 105
Lot 6 91 29 7 0 127 200 60 60 0 7 0 127
Northside Lot 0 124 4 18 146 0 0 0 124 4 18 146
Miles Ave Lots 0 57 4 2 63 0 0 0 57 4 2 63
Park Ave Lot 0 41 1 0 42 16 36 0 5 1 0 42
Montebello Lot 0 24 2 0 26 8 20 0 4 2 0 26
Southside Lot 0 15 1 0 16 24 9 0 6 1 0 16
On-Street
Almendra Ave 15 0 0 0 15 0 7 8 0 0 0 15
Bachman Ave 38 0 0 0 38 0 15 23 0 0 0 38
Broadway 27 0 0 0 27 0 7 20 0 0 0 27
Elm Street 1 0 0 0 1 0 0 1 0 0 0 1
Grays Lane 10 0 0 0 10 0 4 6 0 0 0 10
Lyndon Ave 11 0 0 0 11 0 5 6 0 0 0 11
Main Street 71 0 0 0 71 0 0 71 0 0 0 71
Miles Ave 71 0 0 0 71 0 0 71 0 0 0 71
Montebello Way 19 0 0 0 19 0 0 19 0 0 0 19
Mullen Ave 4 0 0 0 4 0 0 4 0 0 0 4
Petticoat Lane 7 0 0 0 7 0 0 7 0 0 0 7
Santa Cruz Ave 172 0 0 0 172 0 0 172 0 0 0 172
University Ave 80 0 0 0 80 0 0 80 0 0 0 80
Royce Street 13 0 0 0 13 0 6 7 0 0 0 13
Village Lane 32 0 0 0 32 0 10 22 0 0 0 32
1041 549 45 26 1661 821 486 908 196 45 26 1661
Attachment 2

Page 319 ends
← All documents from this meeting