ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
65 Cooperation
Attention is directed to Section 5-1.36C, “Nonhighway Facilities,” of the Standard Specifications.

It is the Contractor’s responsibility to work with utility companies to coordinate the removal, relocation, raising to grade, installation of the new facilities, or any other utility work as shown on the plans or indicated in the specifications with the appropriate utility company. The Contractor shall provide advance notification and shall allow sufficient time and work space for the utility company to complete the work necessary.

If in the opinion of the Engineer, the Contractor’s operations are delayed by reason of utility facilities not being removed or relocated, the Contractor will be entitled to an extension of time only. The Contractor shall be entitled to no other compensation for such delay.

Progress Schedule
The Contractor shall submit a project progress schedule for approval by the Engineer within eight (8) Working Days, not including Saturdays, Sundays, and legal holidays from the date of the Notice of the Award of Contract or 3 days before the pre-construction conference, whichever comes first. Failure to submit an acceptable progress schedule shall result in rejection of the Contractor’s proposal. The progress schedule shall be in the form specified below unless otherwise specified in the Special Provision or approved by the Engineer. Updated progress schedules shall be provided by the Engineer monthly with the estimates of work required in Section 9-1.16, “Progress Payments,” of the Standard Specifications. No partial payments will be made for any work until an updated schedule has been submitted and approved by the Engineer. Updated schedules shall incorporate all current schedule information, including actual progress, approved time adjustments, and proposed changes in sequence and logic.

The Contractor must furnish a computerized schedule prepared by the critical path method (CPM) which shows the order in which the Contractor proposes to carry out the work; the sequence and interdependence of construction activities; all salient features of the work (including procurement of materials and equipment); the dates on which the Contractor will start the salient features of the work; and the scheduled dates for completing the said salient features.

The construction schedule shall include:
a. Time for submittals and reviews;
b. Time for fabrication and delivery of manufactured products for the work; and c. The interdependence of procurement and construction activities.

The construction schedule shall:
a. Be a timescaled network diagram referenced to specific calendar dates; b. Include time for the Engineer to review submittals or inspect the work; and c. Identify the activities which constitute the controlling operations or critical path.

The construction schedule shall not contain multiple critical paths.

Scheduling of change order work is the responsibility of the Contractor. The Contractor shall revise the schedule to incorporate all activities involved in completing the change order work, and submit a new schedule to the Engineer for review.

Delays or changes to non-critical activities will not be considered for a contract time extension. Non-critical activities are those activities which when delayed, do not affect the contract completion time.

The project schedules submitted shall be consistent in all respects with the time and order of work requirements of the contract. The Engineer, at his or her sole discretion, retains the right to reject any and all construction schedules

Page 102 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
66 submitted by the Contractor, including when the Engineer determines that the Contractor has too many items on the Critical Path, or the logic of the schedule is in error, or if the Engineer determines salient items of work are missing from the schedule.

Subject to the above provisions, nothing herein shall preclude the Contractor from early completion of the contract.

The Contractor shall submit updated progress schedules to the Engineer as a condition of approval for the monthly progress payments and final acceptance.

Record Drawings
The Contractor shall keep and maintain on the job site, one record set of drawings. On these, the Contractor shall mark all project conditions, locations, configurations, and any other changes or deviations which may vary from the details represented on the original contract documents, including buried or concealed construction and utility features which are revealed during the course of construction. Final payment will not be approved until the Contractor prepared record drawings have been delivered to the Engineer.

General Measurement and Payment Requirements
The Contractor shall submit in all field quantities completed to date for payment with each monthly pay estimate. The Contractor shall provide, in writing, who from their team will be responsible for field measuring quantities with the Town’s representative. Upon completion of a contract bid item, the Contractor’s representative shall field measure the final quantities with the Town’s representative. This agreed upon amount will be considered final and no re-measuring of these field quantities will be allowed without the approval of the Engineer. All supporting documentation required for payment of an item, shall be submitted by the Contractor within two pay periods following the work. Documentation submitted more than two pay periods after the work was completed will not be paid and the cost of this work shall be borne by the Contractor.

Truck Routes
Per the Town Ordinance Section 15.30.410, the following streets and highways or portions thereof within the Town limits are designated Truck Routes and are authorized for use by operators of trucks and other vehicles, which exceed a maximum gross weight of ten thousand (10,000) pounds:
• Highway 17
• Los Gatos-Saratoga Road (Highway 9)
• Los Gatos-Almaden Road
• Los Gatos Boulevard
• Blossom Hill Road
• Winchester Boulevard
• Lark Avenue
Other Town streets are unauthorized for truck routes unless otherwise approved by the Engineer.

Hours of Work
Unless otherwise approved in writing by the Engineer or specified in these Contract Documents, the hours of work for this project are Monday through Friday, 8:00 AM to 5:00 PM, unless otherwise approved by the Engineer.

The work hours will be strictly enforced. The Engineer has full authority to implement the working hours and completely shut down the construction operations outside the hours of work specified. Should the provisions of this section not be met, liquidated damages of One Thousand Dollars ($1,000.00) for every 60-minute time period (or portion thereof) beyond the hours of work allowable shall be withheld from moneys due to the Contractor.

Page 103 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
67 24-Hour Contact Number
The Contractor shall assign a project superintendent who has the complete authority to make decisions on behalf of the Contractor. The project superintendent shall be on the job at all times during construction and shall be available and on call 24 hours a day for the duration of the project. The Contractor shall provide to the Engineer and to the Los GatosMonte Sereno Police Department a 24-hour contact number for the project superintendent. This number shall not direct calls to a recorder or other message taking service.

Advance Public Notification
Two weeks prior to beginning any work in an area, the Contractor shall deliver written notice to all adjoining residents and businesses, tenants and other applicable parties listed below and all other properties where their only ingress/egress is through the project’s work area. Individual or separate notices shall be given for general construction activity in an area as well as specific activities, which will, in any way, inconvenience the resident/property owner/tenant or affect their operations or access to their properties. Such notices shall include the expected date for start of construction, a general description of the construction activity to take place, expected duration of the activity, and the name, address, and the contact number of the Contractor’s superintendent. The Contractor shall provide accurate information regarding the construction schedule and activities to be incorporated into the “two-week” notification. The Contractor shall make every effort to coordinate work with individual residents and businesses whose access will be disrupted in order to minimize the disruption and impacts on the resident or business.

The Contractor shall also prove and hand-deliver a “two-day” notice. The notice shall be distributed two working days prior to the work beginning. The “two-day” notice shall be delivered to all adjoining residents and business, tenants, and other applicable parties listed below and any other properties who sole ingress/egress is through the project’s work area.

Copies of all notices shall be provided to the Engineer for approval five (5) working days prior to the desired distribution date.

Should the Contractor’s schedule change and/or differ in any capacity from the schedule initially mentioned in the notification to the resident/property owner/tenant or from the updates to the Town website, the Contractor shall renotify all applicable parties (residents/property owner/tenant and/or businesses mentioned below) five (5) working days prior to the beginning of any work on that street.

The Contractor shall contact and coordinate the work with the following parties throughout the project. The “two-week” and “two-day” notification shall also be given to the following parties prior to beginning any work:

Santa Clara Valley Transportation Agency–Steve Newgren–(408) 952-4106 West Valley Collection and Recycling–(408) 283-8500
U.S. Postal Service–Post Master–(408) 395-7526
Los Gatos/Monte Sereno Police Department–(408) 354-8600 Santa Clara County Fire Department–(408) 378-4010
The Contractor shall also give written notice to residents/businesses for any driveway closures or anticipated service disruptions. The Contractor shall coordinate all disruptions with the appropriate utility, property owner, resident, business and the Town. Notice shall be given in advance and specify the duration of the disruption of any utility, and the temporary closure of access to any driveway. Such notice will comply with the requirements for closure of driveway access as specified under Special Provision Section 10-2, “Traffic Control Requirements.” Lack of proper advance notification and coordination shall result in the work being shut down. All costs associated with the stoppage of work shall be borne by the Contractor.

Page 104 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
68 Line and Grade
The Contractor shall layout the project by providing all stakes and marks needed to establish the lines and grades required for completion of the work specified on the Plans and in these Contract Documents to the satisfaction of the Engineer.

Meetings
Prior to commencement of any work on the project, a pre-construction conference will be scheduled by the Town and held at the Town’s Engineering Building or hosted via virtual meeting for the purpose of review and discussion of the project schedule and construction procedures. The Contractor’s project manager and/or project superintendent and representatives from all listed subcontractors shall be required to attend the pre-construction conference. The Contractor shall prepare and submit at the pre-construction meeting the proposed project schedule, water pollution control plan, traffic control plan, public notification letter, and other submittals as specified under Special Conditions.

The Contractor shall also schedule and conduct weekly field meetings at locations to be determined by the Town. The meetings shall be held at the same time and place each week and shall include all subcontractors working on the project and discussions of scheduled work on the project during the week of the meeting. The Contractor shall notify the Engineer of the time, date, and location of these meetings 72 hours in advance of the first meeting. Detailed schedules for the following two weeks shall be submitted to the Engineer at each weekly meeting.

Waste Haulers and Recycling Operations
The Contractor shall not impair or impede waste hauler and recycling operations scheduled to be conducted within the project area. It is the Contractor’s responsibility to determine which waste hauler and recycling operators are scheduled to operate within the project area, and to develop a project schedule that will not impair or impede the waste hauler or recycling operations.

Project Appearance and Street Sweeping
The Contractor shall maintain a clean work site. Debris developed during construction shall be disposed concurrently with its generation. Stockpiling of debris or construction materials shall not be allowed unless otherwise approved by the Engineer.

The Town prohibits the use of any public property or public right-of-way locations as construction staging points, unless specifically approved by the Engineer.

Right-of-Way
The Contractor shall operate within the public right-of-way only.

Work in Private Property
The Contractor shall secure right-of-entry agreements with each private property owners before any work in private properties. The language for the right-of-entry agreement must be approved by the Town.

Tree Protection
The Contractor shall comply with the Town Ordinance Chapter 29, Article 1, Division 2, “Tree Protection.” The Contractor shall provide protective tree fencing per the Town Ordinance Sec. 29.10.1005, “Protection of trees during construction.” The Engineer and Town Arborist shall be notified of any damages that occurs to a protected tree during construction.

Staging/Disposal Areas
The Contractor shall survey the area for construction staging. Staging areas shall not be located in a residential area.

Page 105 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
69 The following requirements shall apply to the contractor’s staging area:
• No stockpiles or staging area will be allowed in the right-of-way or on undeveloped lots unless specifically approved by the Engineer
• The staging area will be included in the Contractor's SWPPP • The staging area will not be located in an environmentally or culturally sensitive area and/or impact water resources (rivers, streams, bays, inlets, lakes, drainage sloughs). • The staging area will not be located in a regulatory floodway or within the base floodplain (100-year). • The staging area will not affect access to properties or roadways.

The Contractor shall obtain the approval of the Engineer before staging equipment or storing materials in the public right-of-way or on Town property. In addition, the Contractor shall provide proof of an agreement when using private property for staging, if requested by the Engineer.

All debris shall be hauled off and disposed of the same working day in which the material was generated.

Personal vehicles of the Contractor’s employees shall not be parked in the neighborhood or on the traveled way. When entering or leaving roadways carrying public traffic, the Contractor’s equipment, whether empty or loaded, shall in all cases yield to public traffic and shall travel in the normal direction of travel.

Dust Control
The following requirements shall be applicable to this contract in lieu of the requirements of Section 18, “Dust Palliatives,” of the Standard Specifications:

A. The Contractor shall provide an acceptable plan for preventing the generation of dust due to the Contractor’s operations in the construction zones, along the haul routes, or equipment parking areas. This plan may consist of water sprinkling sweepers or an equivalent service. No separate payment will be made for dust control and all costs in connection therewith shall be included in the payment items to which the work is incidental.

B. In the event the control of dust is not satisfactory to the Owner, the Owner shall take such measures as may be necessary to ensure satisfactory dust control and deduct the cost of such measures from any payments due to the Contractor.

Water for Construction
The costs of water as required for the construction and post-construction on this project, including dust control, shall be considered as included in the costs of items bid for applicable item of work and no separate payment will be made therefor. The Contractor shall conform to the requirements of the water company from which water is purchased. In no case shall the Contractor violate the Town’s water conservation ordinance.

Sanitation
The Contractor shall provide for sanitary facilities for the use of the workers on the job. Such facilities shall be placed and maintained by the Contractor so as not to be a nuisance to the neighbors, nor offensive to the senses nor the community standards of decency. The Engineer shall be the sole judge of the adequacy of the facility, the placement, and the maintenance thereof. Upon notification by the Engineer of deficiencies in any of these areas, the Contractor shall make immediate corrections. Failure to take corrective action within 24 hours shall give the Engineer due cause to stop the work in the contract and to order the corrective work to be done on the sanitary facility and to charge all costs of such work against the monies due or to become due to the Contractor.

Water Pollution Control

Page 106 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
70 Water pollution control work shall conform to the provisions in Section 13, “Water Pollution Control," of the Standard Specifications and these Contract Documents, with the exception of payment. Payment shall be covered under “Measurement and Payment” under these Technical Specifications.

The Contractor shall be responsible for ensuring that all work conforms to the “Best Management Practices for the Construction Industry” found in the Storm Water Pollution Prevention Plan (SWPPP), the “Blueprint for a Clean Bay” handout.

The Contractor shall comply with the requirements of the State Water Resource Control Board (SWRCB) National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharge Associated with Construction and Land Disturbance Activities.

The Contractor shall not violate any discharge prohibition contained in the California Regional Water Quality Control Board San Francisco Bay Basin Water Quality Control Plan (“Basin Plan”).

7.2. Traffic Control Requirements
Measurement and Payment
Full compensation for preparing traffic control plans, temporary pavement delineation, providing construction, changeable message and detour signs, and for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Traffic Control Requirements” of the Contract Documents, including any additional changeable message signs, shall be included and paid for in the appropriate bid item price.

Bid Item #2 Temporary Pedestrian Access L.S.

General
Traffic control shall conform to the provisions of Section 12 "Temporary Traffic Control" of the Standard Specifications, Part 6, “Temporary Traffic Control,” of the California Manual on Uniform Traffic Control Devices (CA MUTCD) with latest revisions, and these Technical Specifications. Nothing in these Technical Specifications shall be construed as relieving the Contractor from the responsibilities specified in Section 7-1.04, “Public Safety,” of the Standard Specifications and these Contract Documents.

The traffic control plan shall be prepared in compliance with the Caltrans Standard Plans and/or CA MUTCD and shall be prepared by a certified traffic engineer or a qualified traffic control professional. The Contractor shall submit a scaled drawing with detailed information, such as lanes to be closed or narrowed, time and days of operation, transitions, cones and barricades, signs, arrow boards, pedestrian and bicycle provisions, etc. The traffic control plan should show length of transitions, cone spacing, sign spacing, etc. based on the posted speed limits or the posted construction zone speed limits. The traffic control plan shall also include a provision for the Contractor to contact and coordinate with the Valley Transportation Authority (VTA) if a bus stop is affected.

The Contractor shall maintain a safe workplace throughout the job including, but not limited to, providing all flaggers, safety equipment, flashing arrow boards, changeable message signs (minimum of two), traffic control devices; maintenance of barricades, safe pedestrian passages along sidewalks, maintenance of handicap access throughout the project site where applicable and maintenance of pavement within the limits of the roadway and driveways with a suitable traffic bearing surface.

Page 107 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
71 The Contractor shall provide and maintain all necessary traffic control devices to ensure safe pedestrian and vehicular access through and around the job site. Warning signs shall be installed at locations in accordance with the CA MUTCD, Part 6, “Temporary Traffic Control.” The Contractor shall fulfill the requirements of this section, 24 hours per day, seven days a week, including holidays, from the time the Notice to Proceed is issued until the project is formally accepted.

Should the Contractor fail to perform these duties, the Engineer, at the Engineer's sole discretion, may elect to have City, or contract forces, perform the duties, deducting the expenses incurred from any moneys that are due, or to become due, to the Contractor. By exercising this option, the Contractor is in no way relieved of the responsibility to perform these duties.

The Contractor shall provide a minimum of two competent and qualified flaggers dedicated solely to directing traffic if traffic lanes have been reduced to only one lane for two-way traffic, in and out of driveways and cross-streets and/or across the construction area as deemed to ensure safe traffic control during construction operations. Flaggers shall be equipped with all necessary tools to properly control the traffic.

Traffic Control/Management Plan
A traffic control plan shall be submitted by the Contractor to the Engineer a minimum of five (5) working days prior to any work commencing on the project. The traffic control plan shall be reviewed and accepted by the Engineer prior to any work commencing on the project. All traffic plans shall be prepared in accordance with the CA MUTCD, Part 6, “Temporary Traffic Control,” Section 12, “Temporary Traffic Control,” of the Standard Specifications, and these Contract Documents.

No Parking Signs
Prior to the start of work which requires parking restriction, the Contractor shall request approval to post and maintain temporary “No Parking” signs on each street where the operations will take place. It shall be the Contractor's responsibility to post "No Parking" signs in the areas where the Contractor's work will require restricted parking. The Town will provide signs for the Contractor's use. To be enforceable, the signs must be posted not less than 72 hours prior to the start of the work at a maximum spacing of 60 feet. The signs must clearly show the date(s) and hours of the parking prohibition, as well as the date and time the signs were posted, and the project name and contractor’s phone number. If the work is not performed during the timeframe indicated on the “No Parking” signs, the work will be rescheduled with at least five (5) working days advance notice. The Contractor shall perform all re-posting of “No Parking” signs and re-notification of businesses, tenants, and residents as a result of his failure to meet the posted schedule. Any delays caused by failure of the Contractor to adhere to the approved schedule will be at the Contractor’s sole expense. No additional compensation will be allowed for costs resulting from said delays.

The Contractor shall remove the “No Parking” signs immediately when they are no longer needed for use in the respective area of the project. The Contractor shall notify the Los Gatos/Monte Sereno Police Department directly after posting and immediately upon removal of the said signs at (408) 354-8600.

During the morning of each scheduled workday, the Contractor shall be responsible for calling the Los Gatos/Monte Sereno Police Department Police Dispatch to tow cars, if necessary, as approved by the Engineer. The Contractor shall have available for the police responding to the call photo documentation of the “No Parking” signs being posted if the signs were removed or vandalized the previous night.

Detours, Temporary Striping, and Barriers
Any approved detours or barriers, signing and striping necessary to complete the construction of the project shall be provided, installed, maintained, and removed by the Contractor at his expense. Temporary striping shall be self-sticking traffic marking tape, vinyl or otherwise, developed for such use, and shall be used for temporary striping as required,

Page 108 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
72 unless shown otherwise on the plans or specified in the Technical Specifications. No painted temporary striping or markings will be allowed unless the temporary markings will be entirely covered by the permanent markings.

Notify the Los Gatos/Monte Sereno Police Department daily at (408) 354-8600 of street or lane closures or detours within the roadway prior to setting up and upon removal of traffic control devices.

Additional Construction Area Signs and Controls
In addition to the requirements of the CA MUTCD, the following traffic controls will be required as specified by the Engineer. These additional requirements in no way relieve the Contractor from his obligation to comply with the standards set forth in that manual.
• "Road Work Ahead" (Type C-23(CA)) signs shall be posted in advance of the first major cross street before the start of the work zone to allow traffic to avoid the work zone prior to entering the zone. The signs shall also be posted at the approaches to the project site.
• "End Road Work" (Type G20-2) signs shall be placed at all public road exits from the project site. • The Contractor shall provide, install and maintain a minimum of four (4) lighted barricades for each individual construction site for concrete improvements (i.e. for curb and gutter removal & replacement and for accessibility ramp installation).
• Changeable message signs will be used starting one (1) week prior to construction beginning and will be maintained in place until construction impacts to the public no longer exist as determined by the Engineer. • “Bikes May Use Full Lane” (R4-11)–modified for temporary construction sign The Contractor shall be responsible for locating existing poles on which to mount these signs or shall provide temporary stands or poles on which to place the required signs. The Engineer shall approve the method of attachment to existing poles prior to sign installation. No sign shall be mounted on decorative street light poles unless the Contractor can clearly show that the mounting method will not damage the finish on the poles.

Upon completion of the work, the signs and posts shall be removed and disposed of outside the public right of way in conformance with the provisions in the Standard Specifications.

Maintenance of Pedestrian Access and Circulation
Safe pedestrian access and circulation that is fully wheelchair accessible shall be maintained by the Contractor through or around the project area. All walkways, pedestrian crossings, ramps and other pedestrian facilities removed or blocked by the Contractor’s operations shall be replaced with temporary facilities unless otherwise approved by the Engineer.

Pedestrian access at each individual project site may be diverted for a maximum of five (5) calendar days with approved traffic control plan. Drop off from existing improvements to excavated areas shall be temporarily ramped. Ramps shall be maintained at 12:1 or flatter with compacted sub-grade or base rock material until final improvements are installed.

Lane Closures
Requests for lane closures shall be made a minimum of five working days prior to the proposed closure. Once the lane closure has been approved by the Town, the Contractor shall post a minimum of five (5) working days in advance of the proposed lane closure a changeable message sign at the limits of each closure or as specified by the Engineer. These changeable message signs shall also be used on the day of the actual closure. The changeable message signs shall indicate the days and hours of the proposed lane closure and the type of work being done during that lane closure.

Flashing arrow signs shall be used for all lane closures. The Contractor shall check with the Engineer to confirm any lane closure restrictions that may be in effect before closing any lanes.

Page 109 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
73 The Contractor shall leave the streets open to traffic until just prior to starting the work, and will provide all barricades, signs and traffic control measures necessary to protect the work.

No work that interferes with public traffic shall be performed outside of the working hours, except as otherwise approved by the Engineer. All traffic lanes shall be open to traffic outside of the working hours.

A minimum of one paved, or surfaced traffic lanes and one paved bicycle lane, not less than fifteen (15) feet wide (10 foot wide for the traveled vehicle lane and 5 feet wide for the bicycle lane), shall be open for use by public traffic in each direction of travel. Traffic may not be routed over unpaved roadways unless authorized by the Engineer.

In addition, the full width of the traveled way on each street shall be open for public use on Saturdays and Sundays (except for those streets approved by the Engineer for weekend work), on designated legal holidays, and when construction operations are not actively in progress. Designated legal holidays are: January 1, the third Monday in January, the third Monday in February, June 19, the last Monday in May, July 4, the first Monday in September, the fourth Thursday of November, and December 25. When a designated holiday falls on a Saturday, the preceding Friday shall be treated as a legal holiday. When a designated holiday falls on a Sunday, the following Monday shall be treated as a legal holiday.

Deviations from the requirements of this section concerning hours of work, which do not change the cost of the work, may be permitted upon the written request of the Contractor, if in the opinion of the Engineer, the general public will be better served and the work expedited. Such deviations shall not be implemented until the Engineer has provided the Contractor with written approval to do so. All other modifications will be made by contract change order.

The Contractor shall pay the Town liquidated damages in the amount of $1,000 per hour (or part of an hour) for traffic control that is set-up before the designated and approved hours of work. Liquidated damages for failure to open streets by the required time shall be $1,000.00 per hour.

Traffic Control System for Lane Closure
A traffic control system shall consist of closing traffic lanes in accordance with the provisions of Section 12, “Temporary Traffic Control,” of the Standard Specifications, and these Contract Documents.

The provisions in this section will not relieve the Contractor from the responsibility to provide additional devices or take measures as may be necessary to comply with the provisions of Section 7-1.04, “Public Safety,” of the Standard Specifications.

Each vehicle used to place, maintain and remove components of a traffic control system on multilane roads shall be equipped with a Type II flashing arrow sign which shall be in operation when the vehicle is being used for placing, maintaining, or removing the components. Vehicles equipped with a Type II flashing arrow sign not involved in placing, maintaining, or removing the components when operated within a stationary type lane closure shall only display the caution display mode. The sign shall be controllable by the operator of the vehicle while the vehicle is in motion.

If any component of the traffic control system is displaced, or ceases to operate or function as specified from any cause, during the progress of the work, the Contractor shall immediately repair the component to its original condition or replace the component, and shall restore the component to its original location.

When lane closures are made for work periods only, at the end of each work period, all components of the traffic control system, except portable delineators placed along open trenches or excavations adjacent to the traveled way, shall be removed from the traveled way and shoulder. If the Contractor so elects, the components may be stored at selected central locations, approved by the Engineer.

Page 110 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
74 Temporary Pavement Delineation
Temporary pavement delineation shall comply with these Technical Specifications and with Section 12-3, “Temporary Traffic Control Devices,” of the Standard Specifications, CA MUTCD, and these Contract Documents.

Property Access Requirements
The Contractor shall maintain property access to all residents and businesses at all times unless otherwise approved by the Engineer. Upon approval by the Engineer, access to certain properties may be temporarily closed if all of the following conditions can be met:
a. No options exist to maintain property access and complete the project. b. The Contractor has discussed the closure with the resident or business owner in person. c. Residents or business owners has been notified, in writing, at least five (5) calendar days in advance of the time and length of closure
d. Resident or business owners have been reminded of the closure, in writing, at least two (2) working days prior to the actual closure.
e. The Contractor has provided the resident or business with a contractor name and number to call with questions regarding the closure.
f. Closure will last no longer than three (3) working days Signalized Intersections
The Contractor shall be responsible for contacting and coordinating with the Town’s signal maintenance contractor for any work at signalized intersections. No additional working days will be given due to the Contractor for not scheduling the work with the Town’s signal maintenance contractor prior to the start of work.

8. Technical Specifications

8.1. Mobilization
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Mobilization” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #1 Mobilization L.S.

General
Mobilization includes moving all materials and equipment onto the site of, furnishing and erecting plants, temporary buildings, and other construction facilities as required to ensure proper performance and completion of the Work.

Mobilization shall include but not be limited to the following principal items:
• Achieving Town approval of the initial Contract Schedule. • Moving on to the site of all Contractor's material and equipment required for first month's operations. • Installing temporary construction power, wiring, and lighting facilities.

Page 111 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
75 • Establishing fire protection system.
• Developing and installing construction water supply.
• Providing field office trailers for the Contractor, and the Engineer if required by the Contract Documents, complete with all specified furnishings and utility services including telephones, telephone appurtenances, computer and printer, and copying machine, Equipment, and Services. • Providing on site sanitary facilities and potable water facilities. • Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer's specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security. • Arranging for and erecting Contractor's work and storage yard • Posting all OSHA-required notices and establishment of safety programs and ensuring all safety programs required by the Contract Documents are implemented.
• Ensuring Contractor's superintendent is present at the job site full time. • Furnishing, installing, and maintaining all off-site storage areas as required to undertake the Work, including all requirements of the Zoning Use Permit.
• Ensuring storm water control and biological compliance provisions are in place as required by the Contract Documents.
• Ensuring all requirements of the approved Storm Water Pollution Prevention Program are in place on the Project Site
Lump Sum Contract Payment
For Lump Sum contracts, the percent of the total Contract Price shown for mobilization will be withheld from any money due the Contractor as initial Progress Payments until all mobilization items have been completed. Such retention of money for failure to complete mobilization items shall be in addition to the Town’s right to retain any payments due to the Contractor.

Payment for mobilization will be made in the form of a single, lump sum, non-proratable allowance determined by the Engineer, and no part thereof will be approved for payment under the Contract until all mobilization items listed above have been completed as specified.

Negotiated Change Orders
For negotiated Change Orders to any Contract, mobilization shall not exceed more than 5 percent of the total change order cost unless otherwise approved by the Engineer.

8.2. Temporary Fencing
Measurement and Payment

Page 112 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
76 Full compensation for furnishing all labor, materials, tool, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications and “Temporary Fencing”, of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #3 Temporary Construction Fence L.F.

General
Temporary fencing shall conform to Section 80, “Fences,” of the Standard Specifications, the plans, and these contract documents. The Contractor shall erect, maintain, and dismantle temporary fencing around construction site and materials storage areas.

Product
Unless otherwise indicated, type of temporary chain link fencing shall be Contractor's option. The following types are acceptable:
• New materials or previously used salvaged chain link fencing in good condition. • Posts: Galvanized steel pipe of diameter to provide rigidity. Post shall be suitable for setting in concrete footings, driving into ground, anchoring with base plates, or inserting in precast concrete blocks. • Fabric: Woven galvanized steel wire mesh. Provide in continuous lengths to be wire tied to fence posts or prefabricated into modular pipe-framed fence panels. Steel Tubing: shall conform to ASTM A500, Grade B. • Fence shall be minimum 6’ in height in all places measured from adjacent finished grade.

Execution
Installation of temporary fencing shall not deter or hinder access to existing and new hose connections and fire hydrants. Maintain 3 feet diameter clear space around fire hydrants. Where fire hydrant or hose connection is blocked by fencing, provide access gate. Provide gates for personnel, delivery of materials, and access by emergency vehicles.

Field verify proposed location with Engineer prior to installation.

Chain link posts shall be:
• Space at 10’ maximum on center.
• Drive posts, set in holes and backfill, or anchor in precast concrete blocks. • For soft and unstable ground conditions, install cast concrete plug around post. • For posts over pavement, use steel post plates or precast concrete blocks. • For gate posts, use bracing or concrete footings to provide rigidity for accommodating size of gate.

Page 113 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
77 • Attach fabric Securely to posts.
• Install gates with required hardware.

Maintenance and Removal
Maintain fencing in good condition. If damaged, immediately repair.

Remove temporary fencing upon completion of Work or when no longer required for security or control. Backfill holes and compact. Holes in pavement shall be surfaced to match existing paving. Repair damage caused by installation of temporary fencing.

8.3. Demolition
Measurement and Payment
Full compensation for furnishing all labor, materials, tool, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications and “Demolition”, of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #4 Demolition L.S.

PART 1 -- GENERAL

THE REQUIREMENT
A. The CONTRACTOR shall provide all materials, equipment and labor necessary to perform and complete all demolition work shown on the Drawings and as specified herein. This includes, but is not necessarily limited to, such items as demolition, removal, recycling and disposal of asphalt concrete, miscellaneous concrete, vegetation and all other structures, or features as required.

B. Manufactured articles, materials, equipment, and accessories shall be demolished in accordance with the manufacturer's printed specifications and recommendations, and industry standards, unless otherwise shown or specified.

C. Hazardous materials shall be handled, removed and disposed of in accordance with all regulatory agency requirements.

D. Building utilities shall be disconnected, removed, capped and identified in accordance with the appropriate agency requirements.

E. The CONTRACTOR shall coordinate with the TOWN for demolition permits required by the TOWN and with all other regulatory agencies and utility companies.

REFERENCE SPECIFICATIONS, CODES, AND STANDARDS

Page 114 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
78 A. The demolition and sealing of wells, septic tanks and underground tanks shall be in accordance with regulatory agency requirements. The CONTRACTOR shall obtain all required permits and file all required reports.

B. Commercial Standards:

1. USA Underground Service Alert.

CONTRACTOR SUBMITTALS
A. Demolition Schedule: The CONTRACTOR shall submit a complete coordination schedule for demolition work including shut-off and continuation of utility services prior to start of the work. The schedule shall indicate proposed methods and operations of facility demolition, and provide a detailed sequence of demolition and removal work to ensure uninterrupted operation of occupied areas.

B. CONTRACTOR submit a Waste Management Plan identifying how that diversion will be met.

C. The CONTRACTOR shall provide copies of written agreements from private land owner's, landfill operators, or other agencies accepting disposal of any demolished material prior to any work.

JOB CONDITIONS
A. Condition of Facilities: The TOWN assumes no responsibility for actual condition of facilities to be demolished.

The CONTRACTOR shall visit the site and inspect the existing facilities.

PART 2 -- PRODUCTS (Not Used)
PART 3 -- EXECUTION

OCCUPANCY AND POLLUTION CONTROL
A. Water sprinkling, temporary enclosures, chutes and other suitable methods shall be used to limit dust and dirt rising and scattering in the air. The CONTRACTOR shall comply with all government regulations pertaining to environmental protection.

B. Water shall not be used in a manner that creates hazardous or objectionable conditions such as ice, flooding, or pollution.

PROTECTION
A. Safe passage of persons around area of demolition shall be provided in accordance with all safety and regulatory requirements. Operations shall be conducted to prevent damage to adjacent buildings, structures, other facilities, people and property.

B. Interior and exterior shoring, bracing, or supports shall be provided to prevent movement, settlement or collapse of structures to be demolished and to adjacent facilities to remain.

C. Existing landscaping materials, structures, and appurtenances which are not to be demolished shall be protected and maintained.and replaced if damaged.

Page 115 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
79 D. The CONTRACTOR shall protect and maintain conduits, drains, sewers, pipes and wires that are not to be demolished.

SMALL STRUCTURE DEMOLITION
A. Small structures may be removed intact when acceptable to the ENGINEER and approved by the Town Building Official.

B. Demolition shall proceed in a systematic manner, typically from top of structure to ground.

C. Concrete and masonry shall be demolished in small sections.

BELOW-GRADE DEMOLITION
A. Footings, foundation walls, below-grade construction and concrete slabs on grade including utility lines shall be demolished and removed to a depth which will not interfere with new construction but shall not be less than 12 inches below existing ground surface or future ground surface, whichever is lower.

B. Below-grade areas and voids resulting from demolition of structures shall be completely filled.

C. All fill and compaction shall be in accordance with Section 312300, "Utility Earthwork." D. All fill and compaction surfaces shall be graded to meet adjacent contours and to provide flow to surface drainage structures, or as shown on the Drawings.

E. Where installation of new utilities requires partial removal or demolition of an existing utility, the existing utility shall be removed to sound material. Pipes to be demolished that require no future connection shall be removed to the extent required and sealed and capped. Sanitary sewer laterals shall be removed as required and a new sewer clean out shall be installed in accordance with the Standard Specifications and Details. Pipes to be demolished that require a connection shall be removed to the extent required to install the new connection. Pipe sections shall be removed either by sawcutting, removing a complete pipe section to an existing joint, or other adequate means which results in a clean joint acceptable to the ENGINEER..

F. The CONTRACTOR shall demolish and seal all wells, septic tanks and underground tanks in accordance with applicable regulatory agency requirements and permits.

G. Joint domestic/fire service laterals shall be abandoned as follows:

1. The Blow Off Assembly shall be removed and capped underground.

2. At the connection to the main the existing lateral valve shall be removed and a blind flange shall be installed on the tee at the main. The lateral pipe shall be abandoned in place by capping both ends of the lateral pipe.

3. The existing structural section of the roadway shall be replaced in kind in accordance with the Town Standard specifications.

AT GRADE DEMOLITION
A. All asphalt concrete and all portland cement concrete curbs, gutters, sidewalks, access ramps and driveways shall be saw-cut at the nearest scoreline or deep joint and removed entirely to the saw-cut limits. Where

Page 116 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
80 adjacent pavement or concrete is broken or deteriorated sufficiently to prohibit a sound replacement the entire deteriorated section shall be removed to the limits determined by the ENGINEER.

DISPOSAL OF DEMOLISHED MATERIALS
A. Demolition and removal of debris shall be conducted to ensure minimum interference with roads, streets, walks and other adjacent occupied or used facilities which shall not be closed or obstructed without permission from the TOWN. Alternate routes shall be provided around closed or obstructed traffic ways.

B. Site debris, rubbish and other materials resulting from demolition operations shall become the property of the CONTRACTOR and shall be removed by the CONTRACTOR at the CONTRACTOR's expense to a suitable site. The proper and legal disposal of demolished materials shall be the responsibility of the CONTRACTOR.

PATCHING AND REPAIRING
A. The CONTRACTOR shall provide patching, replacing, repairing and refinishing of damaged areas or damaged adjacent facilities involved in the demolition. New concrete shall match the existing adjacent surfaces, in kind or of better quality, to the satisfaction of the ENGINEER, at no cost to the TOWN or to the owners of the facilities.

CLEANUP
A. During and upon completion of work the CONTRACTOR shall promptly remove unused tools and equipment, surplus materials, rubbish, debris and dust and shall leave areas affected by work in a clean, approved condition.

B. The CONTRACTOR shall clean adjacent structures and facilities of dust, dirt and debris caused by demolition, as directed by the ENGINEER or governing authorities, and return adjacent areas to condition existing prior to start of work.

C. The CONTRACTOR shall clean and sweep daily all street and roads affected by its operation.

8.4. Site Clearing and Tree Protection
Measurement and Payment
Full compensation for furnishing all labor, materials, tool, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications and “Site Clearing and Tree Protection”, of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #5 Clearing and Grubbing L.S.

Bid Item #7 Existing Tree Protection E.A.

PART 1 - GENERAL

SUMMARY
A. This Section includes the following:

1. Protecting existing trees to remain

Page 117 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
81 a. Protecting and maintaining existing trees and vegetation not specifically designated for removal, to remain.
b. Protection shall be extended to trees and/or vegetation located within or adjacent to the Project Site, whether the tree trunk and/or vegetation is located within the designated Limits of Work.

2. Removing existing grass

3. Clearing and grubbing.

4. Stripping and stockpiling topsoil.

5. Removing above- and below-grade site improvements.

6. Minor obstructions above and below grade including irrigation.

7. Disconnecting and capping or sealing site utilities.

8. Temporary erosion and sedimentation control measures.

B. Related Documents:

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions.

I. The Drawings.

II. Division 01 Specification Sections and related requirements in other sections of the Project Manual.

III. Related requirements in other Contract Documents listed in the Agreement.

IV. Review these documents for coordination with additional requirements and information that apply to work under this Section.
a.
a.

DEFINITIONS
A. Tree Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction, and defined by the drip line of individual trees or the perimeter drip line of groups of trees, unless otherwise indicated

1. "Dripline" shall be generally defined as the outermost extent of the tree's foliaged canopy, which encompasses the tree leaves or fronds, trunk, branches, roots, and soil. In no case shall a dripline encompass an area under a tree canopy, which is less than ten feet (10'), in diameter. Since each tree is unique in size, scale, and form, the delineated dripline of each tree shall be refined at the discretion of the Landscape Architect.

Page 118 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
82 2. "Injury" shall be defined, without limitation, as any bruising, scarring, tearing, gouging, or breaking of roots, branches, or trunk(s), soil compaction around the dripline, or contamination around the dripline which results in the decline to the health of the tree
B. Subgrade: The uppermost surface of an excavation, including excavation for trenches, or the top surface of a fill or backfill immediately below base course, pavement, or topsoil materials.

C. Unauthorized excavation consists of removing materials beyond indicated subgrade elevations or dimensions without direction by the Owner’s representative. Unauthorized excavation, as well as remedial work directed by the Owner’s Rep shall be at the Contractor's expense.

3. REFERENCE
A. Standards for Tree Care Operations (Z133.1), American National Standards Institute, Latest Edition.

B. Safety Standards for Tree Care Operations (Z133), American National Standards Institute, Latest Edition.

C. Tree Pruning Guidelines, International Society of Arboriculture, 1995 Edition.

D. Pruning Standards for Shade Trees, National Arborists Association. Latest Edition

MATERIAL OWNERSHIP
A. Except for stripped topsoil or other materials indicated to remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.

SUBMITTALS
A. Photographic and/or digitally recorded documentation, sufficiently detailed, of existing conditions of trees and plantings, adjoining construction, and site improvements must be prepared. Unless otherwise documented, any damage discovered to trees, plantings, and site features denoted to remain, will be considered the responsibility of the contractor to correct. The owner may at his/her discretion request such photographs and/or video tapes be submitted at any time
B. Submit complete detailed schedule and description of Work to be done within dripline, (if any), including list of equipment to be used.

C. Submit schedule and description of proposed pruning and/or other remedial work to existing plant materials.

Submit qualifications describing years of experience and list of similar projects completed for the following:

1. State of California licensed Pest Control Advisor shall propose application of all herbicides or pesticides.

Page 119 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
83 2. Certified Arborist shall propose pruning of all trees or other vegetation. Certified Arborist shall have a minimum of five (5) year’s post-certification experience performing pruning and observation work for projects of comparable size with trees of similar size and nature.

D. Tree Pruning Company, and List of Certified Tree Workers, who will perform Work on the Project relating requirements herein this Section. Tree Pruning Company shall have a minimum of five (5) years experience specializing in performing the work of this Section for projects of comparable size with trees of similar size and nature.

E. Record drawings, according to Division 01, identifying and accurately locating capped utilities and other subsurface structural, electrical, and mechanical conditions.

1. PROJECT CONDITIONS
A. Contractor shall become aquatinted with existing site conditions, verifying quantities and locations of all protected trees and vegetation, and other information as may be necessary. Notify Landscape Architect of unsatisfactory conditions, in writing, prior to commencement of Work.

B. Tree Flagging: Prior to commencement of Work, Contractor shall flag all existing trees and vegetation to remain and protected throughout the duration of Work. Adequately flag tree trunks with bright-colored tape (neon colors preferred). Verify flagged trees and vegetation with Landscape Architect.

C. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction.

D. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises where indicated.

E. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing.

F. Do not commence site clearing operations until temporary erosion and sedimentation control measures are in place.

G. Improvements on Adjoining Property: Authority for performing indicated removal and alteration work on property adjoining Owner's property shall be obtained by the adjoining property Owner(s) prior to commencement of Work.

H. Protect existing Work and Work of other trades: Damage to existing construction caused by Work of this Section shall be promptly repaired and/or replaced at the expense of the Contractor.

Page 120 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
84 I. Environmental Requirements:

1. Perform actual pruning operations (if needed) during those seasons suitable for the specific tree type, in accordance with locally acceptable horticultural practices.

J. Pre-Tree Pruning/Tree Protection Conference:

1. Contractor shall conduct a Pre-Tree Pruning/Tree Protection Conference at the Project Site with Certified Arborist (who will be on-site supervising the Work of the Project) and the Owner.

2. The Contractor shall be responsible for notifying all parties, in writing, at least seven (7) days in advance to schedule the Conference.

3. The Contractor shall provide to all parties in attendance within seven (7) days a written legible inventory of Work to be accomplished, including species (botanical and common name), location, size, specific pruning needs or tree protection needs as identified during the Conference, recommended pruning or tree protection methods to meet the identified needs, and any additional conditions noted.

K. Staging Areas - Approval must be obtained from the Owner to use any area for staging that is not specifically identified as such on the plans. The Contractor shall restore all areas used for staging, the extent of said restoration to be defined by the Owner upon granting approval for the use of said area for staging.

L. Whether shown on the Plan or not, existing improvements, adjacent property, Utility and other facilities, and trees and plants that are not to be removed shall be protected from injury or damage resulting from the Contractor's operations.

M. The Contractor shall make such investigations and examinations as are required to determine the existence and locations of all pipes, conduits, and other underground improvements and shall consult with and advise the owners of the Utilities before undertaking any work that might endanger them.

N. The Contractor shall assume full responsibility for any damage to pipes, conduits, poles, or any other structures or Utilities. She/He shall not make any claim for inconvenience, delay or added cost of performing the Work which may be attributed in any degree to inaccuracy of information furnished by the Town relative to the locations, sizes, dimensions, depths, and character of any pipes, conduits, poles, or other structures and Utilities or for failure of the Town to furnish any information relative thereto.

O. The Town does not guarantee the accuracy or completeness of any data shown on the Plans relative to the locations, sizes, dimensions, depths, and character of pipes, conduits, poles or any other structures or Utilities located above ground or underground.

P. At locations where lawn sprinkler systems exist, the Contractor will cut and cap water lines at the property lines or at such point as directed by the Engineer. All heads and pipe removed shall be salvaged and returned to their respective owners. Full compensation for cutting and capping water lines shall be considered as included in this item.

Q. Existing land subdivision monuments and stakes shall be fully protected from damage or displacement and they shall not be disturbed unless directed by the Engineer.

Page 121 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
85 1.

QUALITY ASSURANCE
A. Preinstallation Conference: Conduct conference at Project Site to comply with requirements in Division 1 B. Pruning and remedial work shall be done under the direct supervision of an Arborist certified by the International Society of Arborists (ISA); or Arborist who is a member of the American Society of Consulting Arborists, in compliance with ISA and ANSI Standards. Arborist shall be on Site continuously while existing trees or roots are being pruned or remedial work is being performed.

C. Contractor shall guarantee that all plants covered by the Provisions of this Section shall be healthy and in a flourishing condition of active growth for one (1) year from the date of Substantial Completion.

D. Requirements of the guarantee shall apply if failure of the Contractor to take specified precautions and Work within restrictions of this Section contributes to the destruction, decline, or injury to a tree to remain, in the judgement of the Landscape Architect.

E. If a tree to remain is destroyed or injured so that in the judgement of the Landscape Architect it should be replaced, it shall be removed at the expense of the Contractor. Contract shall pay compensation to the Owner of the property where the tree was located at the rate as specified herein this Section (see Compensation).

COMPENSATION
A. Contractor shall replace any existing tree that died or sustained injury from the result of the Contractor’s negligence to provide adequate required tree protection, pruning, or maintenance during the course of construction operations. Compensation shall be awarded to the Owner as follows:

1. Contractor shall thoroughly remove damaged tree, including trunk, branches, and roots, at no cost to the Owner, and at the direction of the Landscape Architect.

2. Contractor shall furnish and install per requirements in Section 10-10 “Landscape Planting”, with a minimum six-inch (6”) caliper tree of the same form, species, and in the same quantity as those tree(s) that were damaged, at the direction of the Landscape Architect. Compensation shall include the actual cost of the item boxed out of the ground; transportation or delivery of boxed item to the site; unloading, planting and staking; maintenance, including watering, fertilizing, pruning, pest control, and other care to bring replacement to same general condition of the original item.

3. Contractor shall provide an additional cash settlement to the Owner, based on the following formula:
a. Tree caliper measurement of the damaged tree(s), where caliper is measured at the greatest trunk diameter 24” above the finished grade:

Tree Trunk Caliper Amount

Page 122 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
86 Less than 12” $3,000.00
12” to 18” $8,000.00
over 18”, add for each caliper inch $1,000.00
A. Contractor shall replace any vegetation (other than trees) that died or sustained injury from the result of the Contractor’s negligence to provide adequate required vegetation protection, pruning, or maintenance during the course of construction operations. Compensation shall be awarded to the Owner as follows:

1. Contractor shall thoroughly remove damaged vegetation at no cost to the Owner, and at the direction of the Landscape Architect.

2. Contractor shall furnish and install per requirements in Section 10-10 “Landscape Planting”, with five (5) gallon container stock minimum (as applicable) of the same form, species, and in the same quantity as vegetation that was damaged, at the direction of the Landscape Architect.

PART 2 - PRODUCTS

SOIL MATERIALS
A. Satisfactory Soil Materials: Requirements for satisfactory soil materials are specified in Division 31 Section "Earth Moving."

1. Obtain approved borrow soil materials off-site when satisfactory soil materials are not available on-site.

TREE PROTECTION MATERIALS
A. Barricade for Protection of Existing Trees Vegetation

1. Fabric: Utility (snow) type fencing, minimum six feet (6') high, consisting of a vinyl meshed fabric in a bright orange color. Fabric shall be approved by Landscape Architect.

2. Posts: Metal or wood, sufficient in gauge (as appropriate) and size to support the fabric material in a taut and plumb condition. Posts shall be subject to approval by the Landscape Architect.

3. Signs: Posted plastic laminated signs, attached to fabric fencing, with words "WARNING- KEEP OUT-TREE PROTECTION ZONE".

B. Mulch: Where available, Contractor shall stockpile and reuse shredded wood chips produced from on-site tree removals and remedial work, if chips are disease free and acceptable to the Landscape Architect. Where on-site chips are not available, Contractor shall provide mulch as specified in Section 10-10 "Landscape Planting".

PART 3 - EXECUTION

Page 123 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
87 PREPARATION
A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Locate and clearly flag trees and vegetation to remain or to be relocated.

C. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Owner.

TREE PROTECTION
A. Install tree protection barricades before commencement of Work.

B. Erect and maintain temporary fencing around tree protection zones before starting site clearing. Remove fence when construction is complete.

C. Protect existing trees and other vegetation indicated to remain in place against the following:

1. Storage or parking of automobiles or other vehicles.

2. Stockpiling of building materials, refuse, or excavated materials.

3. Use of tres as support posts, power posts, or sign posts, anchorage for ropes, guy wires, or power lines, or other similar functions.

4. Dumping of poisonous materials on or around plant roots, trunks, branches, or foliage. Such materials include, but are not limited to, paint, pertroleum products, dirty water, or other deleterious materials.

5. Cutting, breaking, or shinning of roots caused by utility trenching, foundation digging, placement of curbs and trenches, and oyher miscellaneous excavation without prior written approval by the University's Authorized Representative.

6. Damage by skinning or bruising of bark on trunks or branches, caused by maneuvering vehicles or stacking material or equipment too close to the plant.

7. Compaction of the soil within the dripline of the plants due to movement of trucks or grading machines, pedestrian or vehicular traffic, storage of equipment or materials.

8. Excessive water or heat from equipment, utility line construction, or burning of trash under or near vegetation to remain.

9. Damage to root system from flooding, erosion, and excessive wetting and drying resulting from watering and other operations.

D. Prior to commencement of construction activities, the Contractor shall erect and maintain a temporary fenced barricade around the dripline of individual trees, around perimeter dripline of groups of trees, or around other vegetation to remain.

Page 124 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
88 1. Prevent damage to roots during installation of barricade posts. Space posts approximately 4’-0” on center and securely attach fabric.

2. Barricades shall be installed plumb, taut, and sturdy to prevent unauthorized access around dripline of trees and protected vegetation. Repair sagging or damaged barricades immediately.

3. Immediately after barricade fencing is installed, cover entire soil area inside of the fence area with a fourinch (4”) layer of mulch. Keep mulch 18” away from root crown. Irrigate protected trees and vegetation to a moist soil depth of 18” deep.

4. During the course of construction, relocation of the barricade may be required to facilitate construction.

Contractor shall relocate barricade as directed by the Landscape Architect at no additional expense to the Owner.

5. Remove barricade when construction operations are complete or when directed by Landscape Architect.

E. Irrigation: Contractor shall supply fresh potable water in adequate amounts and rates of application as required to maintain the health of all protected trees and vegetation throughout the duration of the construction operations. Contractor shall maintain a watering schedule and document dates and duration of irrigation applications.

1. Construct a temporary watering basin, as required, on the surface of the existing undisturbed grade, with imported soil, to aid in the retention of water around existing protected trees and planting.

F. Do not excavate within drip line of trees, unless approved, in writing, by the Landscape Architect.

G. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, comb soil to expose roots, and cleanly cut roots as close to excavation as possible.

1. Cover exposed roots with burlap and water regularly to keep moist.

2. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.

3. Cover exposed roots with wet burlap to prevent roots from drying out. Backfill with soil as soon as possible.

H. Protect root systems of existing trees and vegetation from damage due to chemically injurious materials in solution caused by run-off or spillage during mixing or placement of construction materials, and drainage of stored materials.

I. Protect root systems from flooding, erosion, excessive wetting or drying resulting from de- watering or other operations.

J. Repair or replace trees and vegetation indicated to remain that are damaged by construction operations, in a manner approved by the Landscape Architect.

1. Employ a qualified arborist, licensed in jurisdiction where Project is located, to submit details of proposed repairs and to repair damage to trees and shrubs.

Page 125 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
89 2. Replace trees that cannot be repaired and restored to full-growth status, as determined by the qualified Arborist.

CLEARING AND GRUBBING
A. Remove obstructions, trees, shrubs, grass, and other vegetation to permit installation of new construction.

Removal includes digging out stumps and obstructions and grubbing roots.

1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.

2. Cut minor roots and branches of trees indicated to remain in a clean and careful manner where such roots and branches obstruct installation of new construction.

3. Completely remove stumps, roots, obstructions, and debris extending to a depth of 18 inches below exposed subgrade.

4. Use only hand methods for grubbing within drip line of remaining trees.

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated.

C. Clearing and grubbing shall conform to the provisions in Section 17-2 of the State Standard Specifications and these provisions.

D. Unless otherwise specified, the entire area within the Project limits shall be cleared and grubbed. No payment will be made to the Contractor for clearing and grubbing outside these limits, unless such work is authorized by the Engineer.

E. The Contractor shall inform himself/herself as to all regulations and requirements of the Town of Los Gatos and shall conduct his/her operations in compliance therewith.

F. Concrete removal shall conform to the provisions in subsection 15-1.03B of the State Standard Specifications and these provisions. Where a portion on an existing concrete facility is to be removed, it shall be cut to a minimum depth of 1 1/2 inches with an abrasive type saw at the first scoring line at or outside the planned joint and removed without damage to any portion that is to remain in place. If curbs and gutters cannot be cut off square and neat, the entire curb and gutter shall be removed to the nearest weakened plane or expansion joint.

No patching at expansion joints will be permitted.

G. All concrete (Portland or asphalt) and oil dirt within the right-of-way shall be removed by the Contractor unless designated to remain on the Plans. Existing manholes, drain wells, drainage structures, irrigation lines, structures and headwalls to be abandoned shall be removed to at least 2 feet below the surface and backfilled or as specified in the Special Conditions.

H. Where existing house foundations and floor slabs overlap into the project area, the whole foundation will be removed. The portion beyond and outside the project area will be considered within the project area and included in the bid price of removing concrete.

Page 126 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
90 I. Removal of any existing gravel, crushed rock surfacing, DG, landscape edging, landscape features, irrigation components, minor site furnishings.
a.

TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.

B. Strip topsoil to whatever depths are encountered in a manner to prevent intermingling with underlying subsoil or other waste materials.

C. Stockpile topsoil materials away from edge of excavations without intermixing with subsoil. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust.

PROUNING AND REMEDIAL WORK
A. Pruning and remedial work shall be done under continuous supervision of the approved Arborist, according to approved submittals, and per ANSI A-300 Pruning Standards.

B. Provide pruning, cabling and bracing, irrigation, pest and disease control and other remedial treatments as recommended by the approved Arborist, required to assure the long-term health of the trees and existing vegetation, and the safety of persons and property.

MAINTENANCE
A. Keep areas within tree protection barricades free from weeds, trash, and debris. Do not use herbicides.

B. Maintain mulch layer and protective devices throughout entire period of construction.

SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and as necessary to facilitate new construction.

DISPOSAL
A. Disposal: Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.

1. Separate recyclable materials produced during site clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials and transport them to recycling facilities.

Page 127 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
91 B. Within the limits of clearing, all stumps, large roots, buried logs, and all other organic material shall be removed 3 feet below the existing ground surface or 6 feet below finished grade, whichever is deeper.

C. Trees and plants that are not designated for removal shall be fully protected from injury by the Contractor at his/her expense. Trees shall be removed in such a manner as not to injure standing trees, plants, and improvements which are to be preserved.

D. Contractor shall be responsible for disposal at their own expense.

8.5. Water Pollution Control
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Water Pollution Control” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #6 Erosion and Sediment Control L.S.

General
Water pollution control work shall conform to the provisions in Section 13, "Water Pollution Control", of the Caltrans Standard Specifications and these Technical Specifications. Water pollution control work shall conform to the requirements in the Water Pollution Control Program (WPCP) Preparation Manual" and the "Construction Site Best Management Practices (BMPs) Manual," and addenda thereto issued up to, and including, the date of advertisement of the project. These manuals are hereinafter referred to respectively as the "Preparation Manual" and the "Construction Site BMPs Manual", and collectively, as the "Manuals". Copies of the Manuals may be obtained from the Department of Transportation, Material Operations Branch, Publication Distribution Unit, and may also be obtained from the Department's Internet website at:
https://dot.ca.gov/programs/construction/storm-water-and-water-pollution-control/manuals-and-handbooks The Contractor shall know and fully comply with applicable provisions of the Manuals, and Federal, State, and local regulations and requirements that govern the Contractor's operations and storm water and non-storm water discharges from both the project site and areas of disturbance outside the project limits during construction. Attention is directed to Sections 7-1.02, "Laws", and 7-1.05, "Indemnification", of the Standard Specifications.

The Contractor shall be responsible for ensuring that all work conforms to the “Best Management Practices for the Construction Industry” found in the Storm Water Pollution Prevention Plan (SWPPP), the “Blueprint for a Clean Bay” handout.

The Contractor shall comply with the requirements of the State Water Resource Control Board (SWRCB) National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharge Associated with Construction and Land Disturbance Activities.

The Contractor shall not violate any discharge prohibition contained in the California Regional Water Quality Control Board San Francisco Bay Basin Water Quality Control Plan (“Basin Plan”).

Page 128 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
92 Water pollution control requirements shall apply to storm water and non-storm water discharges from areas outside the project site which are directly related to construction activities for this contract including, but not limited to, staging areas, storage yards and access roads. The Contractor shall comply with the Manuals for those areas and shall implement, inspect, and maintain the required water pollution control practices. Installing, inspecting, and maintaining water pollution control practices on areas outside the project limits not specifically arranged and provided for by the Town for the execution of this contract, will not be paid for.

The Contractor shall be responsible for penalties assessed or levied on the Contractor or the Town as a result of the Contractor's failure to comply with the provisions in this section "Water Pollution Control" including, but not limited to, compliance with the applicable provisions of the Manuals, and Federal, State and local regulations and requirements as set forth therein.

Penalties as used in this section shall include fines, penalties, and damages, whether proposed, assessed, or levied against the Town or the Contractor, including those levied under the Federal Clean Water Act and the State Porter-Cologne Water Quality Control Act, by governmental agencies or as a result of citizen suits. Penalties shall also include payments made or costs incurred in settlement for alleged violations of the Manuals, or applicable laws, regulations, or requirements. Costs incurred could include sums spent instead of penalties, in mitigation or to remediate or correct violations.

Retention of Funds
Notwithstanding any other remedies authorized by law, the Town may retain money due the Contractor under the contract, in an amount determined by the Town, up to and including the entire amount of penalties proposed, assessed, or levied as a result of the Contractor's violation of the Manuals, or Federal or State law, regulations or requirements.

Funds may be retained by the Town until final disposition has been made as to the penalties. The Contractor shall remain liable for the full amount of penalties until such time as they are finally resolved with the entity seeking the penalties.

Retention of funds for failure to conform to the provisions in this section, "Water Pollution Control", shall be in addition to the other retention amounts required by the contract. The amounts retained for the Contractor's failure to conform to provisions in this section will be released for payment on the next monthly estimate for partial payment following the date when an approved WPCP has been implemented and maintained, and when water pollution has been adequately controlled, as determined by the Engineer.

When a regulatory agency identifies a failure to comply with the Manuals, or other Federal, State or local requirements, the Town may retain money due the Contractor, subject to the following:
a. The Town will give the Contractor seventy-two (72) hours’ notice of the Town’s intention to retain funds from partial payments which may become due to the Contractor prior to acceptance of the contract. Retention of funds from payments made after acceptance of the contract may be made without prior notice to the Contractor.

During the first progress payment period after that the Contractor fails to conform to the provisions in this section, "Water Pollution Control", the Town may retain an amount equal to twenty-five percent (25%) of the estimated value of all contract work performed on the entire contract.

The Contractor shall notify the Engineer immediately upon request from the regulatory agencies to enter, inspect, sample, monitor, or otherwise access the project site or the Contractor's records pertaining to water pollution control

Page 129 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
93 work. The Contractor and the Town shall provide copies of correspondence, notices of violations, enforcement actions or proposed fines by regulatory agencies to the requesting regulatory agency.

Water Pollution Control Program Preparation, Approval, and Amendments As part of the water pollution control work, a Water Pollution Control Program (WPCP) is required for this contract. The WPCP shall conform to the provisions in Section 13, “Water Pollution Control”, of the Standard Specifications, the requirements in the Manuals, and these Technical Specifications. Upon the Engineer's approval of the WPCP, the WPCP shall be considered to fulfill the provisions in Section 13, “Water Pollution Control”, of the Standard Specifications for development and submittal of a Water Pollution Control Plan.

No work having potential to cause water pollution shall be performed until the WPCP has been approved by the Engineer. Approval shall not constitute a finding that the WPCP complies with applicable requirements of the Manuals and applicable Federal, State and local laws, regulations, and requirements.

The Contractor shall designate a Water Pollution Control Manager. The Water Pollution Control Manager shall be responsible for the preparation of the WPCP and required modifications or amendments and shall be responsible for the implementation and adequate functioning of the various water pollution control practices employed. The Contractor may designate different Water Pollution Control Managers to prepare the WPCP and to implement the water pollution control practices. The Water Pollution Control Managers shall serve as the primary contact for issues related to the WPCP or its implementation. The Contractor shall assure that the Water Pollution Control Manager(s) have adequate training and qualifications necessary to prepare the WPCP, implement and maintain water pollution control practices, as described in Section 13, “Water Pollution Control”, of the Standard Specifications.

Within five (5) working days after the execution of the contract, the Contractor shall submit two (2) copies of the draft WPCP to the Engineer. The Engineer will have five (5) working days to review the WPCP. If revisions are required, as determined by the Engineer, the Contractor shall revise and resubmit the WPCP within five (5) working days of receipt of the Engineer's comments. The Engineer will have five (5) working days to review the revisions. Upon the Engineer's approval of the WPCP, one (1) approved copy of the WPCP, incorporating the required changes, shall be submitted to the Engineer. To allow construction activities to proceed, the Engineer may conditionally approve the WPCP while minor revisions are being completed. In the event the Engineer fails to complete the review within the time allowed, and if, in the opinion of the Engineer, completion of the work is delayed or interfered with by reason of the Engineer's delay in completing the review, the Contractor will be compensated for resulting losses, and an extension of time will be granted, in the same manner as provided for in Section 8-1.07, "Delays", of the Standard Specifications.

The WPCP shall incorporate water pollution control practices in the following categories:
a. Soil stabilization.
b. Sediment control.
c. Wind erosion control.
d. Tracking control.
e. Non-storm water management.
f. Waste management and materials pollution control.

The Contractor shall develop a Water Pollution Control Schedule that describes the timing of grading or other work activities that could affect water pollution. The Water Pollution Control Schedule shall be updated by the Contractor to

Page 130 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
94 reflect changes in the Contractor's operations that would affect the necessary implementation of water pollution control practices.

The Contractor shall prepare an amendment to the WPCP when there is a change in construction activities or operations which may affect the discharge of pollutants to surface waters, ground waters, municipal storm drain systems, or when the Contractor's activities or operations violate Federal, State or local regulations, or when directed by the Engineer.

Amendments shall identify additional water pollution control practices or revised operations, including those areas or operations not identified in the initially approved WPCP. Amendments to the WPCP shall be prepared and submitted for review and approval within a time approved by the Engineer, but in no case longer than the time specified for the initial submittal and review of the WPCP.

The Contractor shall keep one copy of the approved WPCP and approved amendments at the project site. The WPCP shall be made available upon request by a representative of the Regional Water Quality Control Board, State Water Resources Control Board, United States Environmental Protection Agency, or the local storm water management agency.

Requests by the public shall be directed to the Engineer.

No adjustment in compensation will be made for ordered changes to correct WPCP work resulting from the Contractor's own operations or from the Contractor's negligence.

If requested by the Contractor and approved by the Engineer, changes to the water pollution control program, including addition of new water pollution control practices, will be allowed. Changes shall be included in the approved amendment of the WPCP. If the requested changes result in a net cost increase to the lump sum price for water pollution control, an adjustment in compensation will be made without change to the water pollution control item. The net cost increase to the water pollution control item will be paid for as extra work as provided in Section 4-1.05, "Changes and Extra Work", of the Standard Specifications.

WPCP Implementation
Unless otherwise specified, upon approval of the WPCP, the Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting, maintaining, removing, and disposing of the water pollution control practices specified in the WPCP and in the amendments. Unless otherwise directed by the Engineer, the Contractor's responsibility for WPCP implementation shall continue throughout any temporary suspension of work ordered in conformance with the provisions in Section 8-1.06, "Suspensions", of the Standard Specifications. Requirements for installation, construction, inspection, maintenance, removal, and disposal of water pollution control practices shall conform to the requirements in the Manuals and these Technical Specifications.

If the Contractor or the Engineer identifies a deficiency in the implementation of the approved WPCP or amendments, the deficiency shall be corrected immediately. The deficiency may be corrected at a later date and time if requested by the Contractor and approved by the Engineer in writing but shall be corrected prior to the onset of precipitation. If the Contractor fails to correct the identified deficiency by the date agreed or prior to the onset of precipitation, the project shall be in nonconformance with this section. Attention is directed to Section 5-1.03, "Engineer’s Authority", of the Standard Specifications, and to "Retention of Funds" of this section for possible nonconformance penalties.

If the Contractor fails to conform to the provisions of this section, "Water Pollution Control", the Engineer may order the suspension of construction operations until the project complies with the requirements of this section.

Implementation of water pollution control practices may vary by season. The Construction Site BMPs Manual and these Technical Specifications shall be followed for control practice selection of year-round, rainy season and non-rainy season water pollution control practices.

Page 131 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
95 Year-Round Implementation Requirements
The Contractor shall have a year-round program for implementing, inspecting and maintaining water pollution control practices for wind erosion control, tracking control, non-storm water management, and waste management and materials pollution control.

The National Weather Service weather forecast shall be monitored and used by the Contractor on a daily basis. An alternative weather forecast proposed by the Contractor may be used if approved by the Engineer. If precipitation is predicted, the necessary water pollution control practices shall be deployed prior to the onset of the precipitation.

Disturbed soil areas shall be considered active whenever the soil disturbing activities have occurred, continue to occur or will occur during the ensuing fifteen (15) working days. Non-active areas shall be protected as prescribed in the Construction Site BMPs Manual within ten (10) working days of cessation of soil disturbing activities or prior to the onset of precipitation, whichever occurs first.

Rainy Season Implementation Requirements
Soil stabilization and sediment control practices conforming to the requirements of these Technical Specifications shall be provided throughout the rainy season, defined as between October 15th and April 15th.

An implementation schedule of required soil stabilization and sediment control practices for disturbed soil areas shall be completed no later than fifteen (15) working days prior to the beginning of each rainy season. The implementation schedule shall identify the soil stabilization and sediment control practices and the dates when the implementation will be twenty-five percent (25%), fifty percent (50%) and one hundred percent (100%) complete, respectively. For construction activities beginning during the rainy season, the Contractor shall implement applicable soil stabilization and sediment control practices.

Non-Rainy Season Implementation Requirements
The non-rainy season shall be defined as days outside the defined rainy season. The Contractor's attention is directed to the Construction Site BMPs Manual for soil stabilization and sediment control implementation requirements on disturbed soil areas during the non-rainy season. Disturbed soil areas within the project shall be protected in conformance with the requirements in the Construction Site BMPs Manual with an effective combination of soil stabilization and sediment control.

Maintenance
To ensure the proper implementation and functioning of water pollution control practices, the Contractor shall regularly inspect and maintain the construction site for the water pollution control practices identified in the WPCP. The construction site shall be inspected by the Contractor as follows:
a. Prior to a forecast storm.
b. After a precipitation event which causes site runoff. c. At twenty-four (24) hour intervals during extended precipitation events. d. Routinely, a minimum of once every two (2) weeks outside of the defined rainy season. e. Routinely, a minimum of once every week during the defined rainy season.

Page 132 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
96 The Contractor shall use the Caltrans Stormwater Site Inspection Report Form CEM-2030 provided at http://www.dot.ca.gov/hq/construc/forms.htm. One copy of each site inspection record shall be submitted to the Engineer within twenty-four (24) hours of completing the inspection.

Reporting Requirements
If the Contractor identifies discharges into surface waters or drainage systems in a manner causing, or potentially causing, a condition of pollution, or if the project receives a written notice or order from a regulatory agency, the Contractor shall immediately inform the Engineer. The Contractor shall submit a written report to the Engineer within five (5) working days of the discharge event, notice or order. The report shall include the following information:
a. The date, time, location, nature of the operation, and type of discharge, including the cause or nature of the notice or order.
b. The water pollution control practices deployed before the discharge event, or prior to receiving the notice or order.
c. The date of deployment and type of water pollution control practices deployed after the discharge event, or after receiving the notice or order, including additional measures installed or planned to reduce or prevent reoccurrence.
d. An implementation and maintenance schedule for affected water pollution control practices.

8.6. Earth Moving / Rough Grading
Measurement and Payment
Full compensation for furnishing all labor, materials, tool, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications and “Earth Moving / Rough Grading”, of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #8 Grading (Rough & Fine) L.S.

PART 1 - GENERAL

SUMMARY
A. This Section includes the following:

1. Preparing subgrades for pavements, lawns, grasses, and exterior plants.

2. Drainage course for slabs-on-grade.

3. Subbase course for concrete pavements.

4. Excavating and backfilling for utility trenches.

B. Related Sections include the following:

1. Division 01

2. Division 02

Page 133 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
97 3. Division 31 Section "Site Clearing and Tree Protection"

4. Division 2

DEFINITIONS
A. Backfill: Soil material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Course placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Course placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Drainage Course: Course supporting the slab-on-grade that also minimizes upward capillary flow of pore water.

F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Architect. Authorized additional excavation and replacement material will be paid for according to Contract provisions changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Architect. Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation.

G. Fill: Soil materials used to raise existing grades.

H. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

I. Subbase Course: Course placed between the subgrade and base course for hot-mix asphalt pavement, or course placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.

J. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below subbase, drainage fill, or topsoil materials.

K. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.

SUBMITTALS
A. Material Test Reports: For each on-site and borrow soil material proposed for fill and backfill as follows:

1. Classification according to ASTM D 2487.

2. Laboratory compaction curve according to ASTM D 698.

Page 134 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
98 B. Pre-excavation Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by earth moving operations. Submit before earth moving begins.

QUALITY ASSURANCE
A. Pre-excavation Conference: Conduct conference at project site.

PROJECT CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction.

B. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by Architect and then only after arranging to provide temporary utility services according to requirements indicated.

C. Do not commence earth moving operations until protection measures are in place.

D. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

A. Do not direct vehicle or equipment exhaust towards protection zones.

A. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones PART 2 - PRODUCTS

SOIL MATERIALS

Page 135 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
99 A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D 2487, free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

1. Plasticity Index: Not exceeding 15.

C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D 2487.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

D. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch sieve and not more than 12 percent passing a No. 20) sieve.

E. Aggregate Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95 percent passing a 1- 1/2-inch) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.

G. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1-inch (25- mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

H. Drainage Course: Narrowly graded mixture of washed crushed stone, or crushed or uncrushed gravel; ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch (37.5-mm) sieve and 0 to 5 percent passing a No. 8 (2.36-mm) sieve.

I. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and natural sand; ASTM D 448; coarse-aggregate grading Size 67; with 100 percent passing a 1-inch (25-mm) sieve and 0 to 5 percent passing a No. 4 (4.75-mm) sieve.

J. Sand: ASTM C 33; fine aggregate.

K. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.

1. PART 3 - EXECUTION

PREPARATION

Page 136 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
100
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.

B. Preparation of subgrade for earthwork operations including removal of vegetation, topsoil, debris, obstructions, and deleterious materials from ground surface is specified in Division 31 Section "Site Clearing." C. Protect and maintain erosion and sedimentation controls, which are specified in Division 31 Section "Site Clearing." during earthwork operations.

DEWATERING
A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations.

Do not use excavated trenches as temporary drainage ditches.

EXCAVATION
A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

EXCAVATION FOR STRUCTURES
A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch (25 mm). If applicable, extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.

1. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.

EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.

EXCAVATION FOR UTILITY TRENCHES

Page 137 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
101
A. Excavate trenches to indicated gradients, lines, depths, and elevations.

B. Excavate trenches to uniform widths to provide the following clearance on each side of pipe or conduit.

Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit, unless otherwise indicated.

1. Clearance: 12 inches each side of pipe or conduit or As indicated.

C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit. Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits. Remove projecting stones and sharp objects along trench subgrade.

1. Excavate trenches 6 inches deeper than elevation required in rock or other unyielding bearing material, 4 inches deeper elsewhere, to allow for bedding course.

SUBGRADE INSPECTION
A. Proof-roll subgrade below the pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

B. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Architect, without additional compensation.

UNAUTHORIZED EXCAVATION
A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi may be used when approved by Architect.

1. Fill unauthorized excavations under other construction or utility pipe as directed by Architect. a.

STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.

UTILITY TRENCH BACKFILL
A. Place backfill on subgrades free of mud, frost, snow, or ice.

Page 138 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
102
B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.

C. Backfill trenches excavated under footings and within 18 inches of bottom of footings with satisfactory soil; fill with concrete to elevation of bottom of footings. Concrete is specified in Division 03 Section "[Cast-in-Place Concrete] [Miscellaneous Cast-in-Place Concrete]."
D. Provide 4-inch- thick, concrete-base slab support for piping or conduit less than 30 inches (750 mm) below surface of roadways. After installing and testing, completely encase piping or conduit in a minimum of 4 inches of concrete before backfilling or placing roadway subbase.

E. Place and compact initial backfill of [subbase material] [satisfactory soil], free of particles larger than 1 inch in any dimension, to a height of 12 inches over the utility pipe or conduit.

1. Carefully compact initial backfill under pipe haunches and compact evenly up on both sides and along the full length of utility piping or conduit to avoid damage or displacement of piping or conduit. Coordinate backfilling with utilities testing.

F. Place and compact final backfill of satisfactory soil to final subgrade elevation.

G. Install warning tape directly above utilities, 12 inches below finished grade, except 6 inches below subgrade under pavements and slabs.

SOIL FILL
A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.

B. Place and compact fill material in layers to required elevations as follows:

1. Under grass and planted areas, use satisfactory soil material.

2. Under walks and pavements, use satisfactory soil material.

3. Under steps and ramps, use engineered fill.

4. Under building slabs, use engineered fill.

5. Under footings and foundations, use engineered fill. a.

SOIL MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

Page 139 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
103

2. Remove and replace, or scarify and air dry otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.

COMPACTION OF SOIL BACKFILLS AND FILLS
A. Place backfill and fill soil materials in layers not more than [8 inches (200 mm)] <Insert dimension>in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations, and uniformly along the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight according to [ASTM D 698] [ASTM D 1557]:

1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches of existing subgrade and each layer of backfill or fill soil material at 95 percent.

2. Under walkways, scarify and recompact top 6 inches below subgrade and compact each layer of backfill or fill soil material at 92 percent.

3. Under lawn or unpaved areas, scarify and recompact top 6 inches below subgrade and compact each layer of backfill or fill soil material at 85 percent.

4. For utility trenches, compact each layer of initial and final backfill soil material at 85 percent.

GRADING
A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

B. Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances:

1. Lawn or Unpaved Areas: Plus or minus 1 inch tolerance.

2. Walks: Plus or minus 1 inch tolerance.

3. Pavements: Plus or minus 1/2 inch tolerance.

4. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch when tested with a 10- foot straightedge.

1. SUBBASE AND BASE COURSES

Page 140 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
104
A. Place subbase and base course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place subbase and base course under pavements and walks as follows:

1. Shape subbase and base course to required crown elevations and cross-slope grades.

2. Compact subbase and base course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 698.

DRAINAGE COURSE
A. Place drainage course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place and compact drainage course under cast-in-place concrete slabs-on- grade as follows:

1. Place drainage course that exceeds 6 inches in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches thick or less than 3 inches thick.

2. Compact each layer of drainage course to required cross sections and thicknesses to not less than 95 percent of maximum dry unit weight according to ASTM D 698.

FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified independent geotechnical engineering testing agency to perform field quality-control testing.

B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earthwork only after test results for previously completed work comply with requirements.

C. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of subgrade with tested subgrade when approved by Architect.

D. Testing agency will test compaction of soils in place according to ASTM D 1556, ASTM D 2167, ASTM D 2922, and ASTM D 2937, as applicable.

E. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and retest until specified compaction is obtained.

PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

Page 141 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
105
B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Owner's property.

B. Contractor is responsible for disposal at their own expense.

8.7. Landscape Grading / Fine Grading
Measurement and Payment
Full compensation for furnishing all labor, materials, tool, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications and “Landscape Grading / Fine Grading”, of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #8 Grading (Rough & Fine) L.S.

GENERAL

SUMMARY
A. This Section includes all materials, labor, transportation, services, and equipment necessary to install landscape planting and landscape construction items as shown on the Contract Drawings, and as specified herein this Section

1. Fine grading
B. Related Documents:

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions. b. The Drawings.
c. Division 01 Specification Sections and related requirements in other sections of the Project Manual. d. Related requirements in other Contract Documents listed in the Agreement.

Page 142 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
106

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

REFERENCES
A. General:

1. The following documents form part of the Specifications to the extent stated. Bring conflicts between Specifications, Drawings, and the referenced documents to the attention of the Architect, in writing, for resolution before taking any related action. Where differences exist between codes and standards, the one affording the greatest protection shall apply.

2. If the year of the adoption or latest revision is omitted from the designation, it shall mean the specification, manual or test designation in effect the date the Notice to Proceed with the Work is given.

SUMMARY
A. This Section includes landscape finish grading complete, as shown, and as specified.

B. Unit Pricing: Lump Sum.

PROJECT/SITE CONDITIONS
A. Existing Conditions: For protection of existing trees to remain, see Contract Drawing.

B. Dust Nuisance: Assume full responsibility for alleviation or prevention of dust as a result of grading work.

C. Observation: Site observation for Scope of Work specified herein this Section shall be made by the City. The Contractor shall request, in writing, at least one (1) week in advance of the time that observation is required.

The Contractor, City, and/or City shall be in attendance at the Project Site at the time of each scheduled observation. Observation shall be required for the following Scope of Work:

1. Pre-Construction Meeting.

2. Incorporation of soil conditioning and fertilizers into the soil.

3. Upon completion of fine grading operations and prior to planting operations.

SEQUENCING AND SCHEDULING:

A. Complete all finish grading prior to installation of sprinkler irrigation systems in each area graded.

B. Regrade as required to finish grades established by Architect once the sprinkler system is installed.

Page 143 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
107
PART 2 - PRODUCTS

MANUFACTURERS
A. Acceptable Manufacturers:

1. Products described below and identified by product name, model number, or other manufacturer designation, are basis of design products. Basis of design products establish the standards of type, function, dimension, in-service performance, physical properties, appearance, warranty, cost, and other characteristics required by the Project.

2. Subject to the requirements of Division 01 “Product Requirements”, products of manufacturers not listed may be proposed for substitution, provided they are comparable to the products specified. a. If “No substitutions” is indicated next to the product name, provide only products of listed manufacturers.
b. The burden of proof of equality of proposed products is on the Contractor.

PART 3 - EXECUTION

EXAMINATION
A. Verification of Conditions: Verify that the following items have been completed prior to commencement of finish grading:

1. Installation of topsoil and soil preparation including debris removal.

2. Incorporation of soil amendments.

B. INSTALLATION
A. Finish Grading:

1. Provide all grades for natural runoff of water without low spots or pockets. Accurately set flow line grades at 2 percent minimum gradient unless otherwise noted in Drawings.

2. Finish grades shall be smooth, even and on a uniform plane with no abrupt changes of surface. Slope uniformly between given spot elevations.

3. Grades not otherwise indicated shall be uniform levels or slopes between points where elevations are given, or between points established by walks, paving, curbs or catch basins.

4. Tops and toes of all slopes shall be rounded to produce a gradual and natural-appearing transition between relatively level areas and slopes.

C. Tolerances:

1. All planting areas, including lawn areas, shall be true to grade within 1 in. when tested with a 10 ft. straightedge.

2. Hold finished grades below top of adjacent pavement, headers, curbs, or walls as follows:

Page 144 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
108
a. Shrub, Annual and Groundcover Areas: 1-1/2 inches.
b. Sodded Lawn Areas: 1 inch.
a.

8.8. Concrete Paving
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for performing all the work involved in compliance with the Plans, Specifications, and “Concrete Paving” of the Technical Specifications, including but not limited to rebar, base rock, and hot mix asphalt, shall be included and paid for in the appropriate bid item price.

Bid Item #10 CONCRETE PAVING TYPE 1 W/ 6" AB S.F.

Bid Item #11 CONCRETE PAVING TYPE 2 W/ 6" AB S.F.

Bid Item #12 CONCRETE PAVING TYPE 2 W/ 6" AB S.F.

Bid Item #15 CONCRETE CURB - LAWN AREA L.F.

GENERAL

SUMMARY
A. This Section includes all materials, labor, transportation, services, and equipment necessary to color and finish exterior, plaza, cast-in-place concrete as shown on the Contract Drawings, and as specified herein this Section.

This Section includes the following:

1. Concrete Curbs.

2. Concrete Walkways and Plaza

3. Concrete Headers.

B. Related Documents:

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions. b. The Drawings.
c. Division 01 Specification Sections and related requirements in other sections of the Project Manual.

Including but not limited;
I. Section 321373 Concrete Paving Joint Sealants
d. Related requirements in other Contract Documents listed in the Agreement.

Page 145 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
109

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, expansive hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume.

SUBMITTALS
A. Product Data: For each type of manufactured material and product indicated.

B. Design Mixtures: For each concrete pavement mixture. Include alternate mixture designs when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

C. Qualification Data: For manufacturer and testing agency.

D. Material Test Reports: From a qualified testing agency indicating and interpreting test results for compliance of the following with requirements indicated, based on comprehensive testing of current materials:

E. Material Certificates: Signed by manufacturers certifying that each of the following materials complies with requirements:

1. Cementitious materials.

2. Steel reinforcement and reinforcement accessories.

3. Color Admixtures.

4. Curing compounds.

5. Applied finish materials.

6. Bonding agent or epoxy adhesive.

7. Joint fillers.

8. Repair materials
F. Field quality-control test reports.

G. Minutes of preinstallation conference.

1. QUALITY ASSURANCE

Page 146 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
110
A. Manufacturer Qualifications: Manufacturer of ready-mixed concrete products who complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA’s “Certification of Ready Mixed Concrete Production Facilities.” B. Testing Agency Qualifications: An independent agency qualified according to ASTM C 1077 and ASTM E 329 for testing indicated, as documented according to ASTM E 548.

1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-01 or an equivalent certification program.

C. ACI Publications: Comply with ACI 301, "Specification for Structural Concrete," unless modified by requirements in the Contract Documents.

D. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures.

E. Mockups: Cast mockups of full-size sections of concrete pavement to demonstrate typical joints, surface finish, texture, color, and standard of workmanship.

1. Build mockups in the location and of the size as directed by Owner’s Authorized Representative. Mockups shall show full range of colors and finishes indicated on contract drawings. Mockups shall be constructed to show various colors and finishes in the adjacent relationships shown on the contract drawings.

2. Cast additional mockups of any proposed alternative methods of obtaining the desired effects, such as alternative methods of exposing aggregate.

3. Notify Owner’s Authorized Representative seven days in advance of dates and times when mockups will be constructed.

4. Obtain Owner’s Authorized Representative's approval of mockups before starting construction.

5. Maintain approved mockups during construction in an undisturbed condition as a standard for judging the completed pavement.

6. Demolish and remove approved mockups from the site when directed by Owner’s Authorized Representative.
a.

PROJECT CONDITIONS
A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities.

PART 2 - PRODUCTS

FORM MATERIALS
A. Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide fulldepth, continuous, straight, smooth exposed surfaces.

Page 147 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
111

1. Use flexible or curved forms for curves with a radius 100 feet or less.

B. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.

STEEL REINFORCEMENT
A. Plain-Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as-drawn steel wire into flat sheets.

B. Deformed-Steel Welded Wire Reinforcement: ASTM A 497, flat sheet.

C. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 deformed.

D. Plain Steel Wire: ASTM A 82,
E. Deformed-Steel Wire: ASTM A 496.

F. Joint Dowel Bars: Plain steel bars, ASTM A 615/A 615M, Grade 60 (Grade 420). Cut bars true to length with ends square and free of burrs.

G. Tie Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

H. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars, welded wire reinforcement, and dowels in place. Manufacture bar supports according to CRSI's "Manual of Standard Practice."

1. Equip wire bar supports with sand plates or horizontal runners where base material will not support chair legs.

3. CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source throughout the Project:

1. Portland Cement: ASTM C 150, Type II gray or white as indicated on contract drawing a. Fly Ash: ASTM C 618, Class [C] [F].
b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.

B. Normal-Weight Aggregates: ASTM C 33, Class 4 coarse aggregate, uniformly graded. Provide aggregates from a single source.

I. Maximum Coarse-Aggregate Size: 3/4 inch nominal.

II. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

C. Water: ASTM C 94/C 94M.

D. Air-Entraining Admixture: ASTM C 260.

Page 148 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
112
E. Chemical Admixtures: ASTM C 494/C 494M, of type suitable for application, certified by manufacturer to be compatible with other admixtures and to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material.

3. ADMIXTURES
A. General: Admixtures certified by manufacturer to contain not more than 0.1 percent water- soluble chloride ions by mass of cement and to be compatible with other admixtures B. Air-Entraining Admixture: ASTM C 260.

C. Water-Reducing Admixture: ASTM C 494, Type A.

D. High-Range, Water-Reducing Admixture: ASTM C 494, Type F.

E. Water-Reducing and Accelerating Admixture: ASTM C 494, Type E.

F. Water-Reducing and Retarding Admixture: ASTM C 494, Type D.

G. Colored Admixture (Integral Color), with matching water-based Colored Curing Wax: Provide materials from a single source and shall be like in color and visual appearance:

1. " Concrete Type 2"
a. Scofield, L. M. Company, Chromix Admixture. London Gray b. or equal (no known equal).

CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth.

B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

C. Water: Potable.

D. Clear Solvent-Borne Liquid Membrane-Forming Curing Compound: ASTM C 309, Type I, Class A or B, wax free.

1. Curing compound for colored concrete: Curing compound shall comply with ASTM C- 309 and be approved by pigment manufacturer for use with colored concrete.

E. Matching-colored, Water-borne Membrane-Forming Curing Compound: ASTM C 309, Type I, Class A.

1. Provide material that has a maximum volatile organic compound (VOC) rating of 350 g/L. a. Lithochrome ® Color Wax™, L.M. Scofield Company.
b. or equal (no known equal)

Page 149 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
113
F. Evaporation Control: Mono-molecular film-forming compound applied to exposed concrete slab surfaces for temporary protection from rapid moisture loss.

RELATED MATERIALS
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber, or ASTM D 1752, cork or self-expanding cork.

B. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene.

C. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class and grade to suit requirements.

1. Types I and II, non-load bearing, for bonding hardened or freshly mixed concrete to hardened concrete.

2. Chemical Surface Retarder (if approved by Owner's Authorized Representative after mock- up review):

Water-soluble, liquid-set retarder with color dye, for horizontal concrete surface application, capable of temporarily delaying final hardening of concrete to a depth of 1/8 to 1/4 inch.

CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, for each type and strength of normal-weight concrete determined by either laboratory trial mixes or field experience.

1. Use a qualified independent testing agency for preparing and reporting proposed concrete mixture designs for the trial batch method.

A. Proportion mixtures to provide normal-weight concrete with the following properties:

1. Compressive Strength (28 Days): 3000 psi.

2. Maximum Water-Cementitious Materials Ratio at Point of Placement: 0.50.

3. Slump Limit: 4 inches, plus or minus 1/2 inch.

B. Add air-entraining admixture at manufacturer's prescribed rate to result in normal-weight concrete at point of placement having an air content as follows:

1. Air Content: 3-1/2 percent plus or minus 1.5 percent for 3/4-inch nominal maximum aggregate size C. Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.

D. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.

E. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement according to ACI 301 requirements as follows. Use cementitious materials other than portland cement only where they will not adversely affect the color. Use a minimum of 20 percent fly ash where it will not adversely affect the color.

Page 150 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
114

1. Fly Ash or Pozzolan: 25 percent.

2. Ground Granulated Blast-Furnace Slag: 50 percent.

3. Combined Fly Ash or Pozzolan, and Ground Granulated Blast-Furnace Slag: 50 percent, with fly ash or pozzolan not exceeding 25 percent.

F. Color Pigment: Add color pigment to concrete mixture according to manufacturer's written instructions and to result in hardened concrete color consistent with approved mockup.

CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Furnish batch certificates for each batch discharged and used in the Work.

1. When air temperature is between 85 deg F (30 deg C) and 90 deg F (32 deg C), reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes.

B. Project-Site Mixing: Permitted only for concrete that will not be visible, such as for footings and masonry fill.

Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For concrete mixes of 1 cu. yd. (0.76 cu. m) or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released.

2. For concrete mixes larger than 1 cu. yd. (0.76 cu. m), increase mixing time by 15 seconds for each additional 1 cu. yd. (0.76 cu. m).

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixing time, quantity, and amount of water added.

PART 3 - EXECUTION

EXAMINATION
A. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances.

B. Prepare subbase and base according to requirements in Division 2 Section "Earthwork." C. Proof-roll prepared subbase surface with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding.

D. Completely proof-roll subbase in one direction. Limit vehicle speed to 3 mph.

E. Proof-roll with a loaded 10-wheel tandem-axle dump truck weighing not less than 15 tons.

Page 151 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
115
F. Subbase with soft spots and areas of pumping or rutting exceeding depth of ¬Ω inch require correction according to requirements in Division 2 Section "Earthwork." G. Proceed with concrete pavement operations only after nonconforming conditions have been corrected and subgrade is ready to receive pavement.

PREPARATION
A. Remove loose material from compacted base surface immediately before placing concrete.

EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for pavement to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement.

B. Clean forms after each use and coat with form-release agent to ensure separation from concrete without damage.

STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

B. Clean reinforcement of loose rust and mill scale, earth, ice, or other bond-reducing materials.

C. Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement.

D. Install welded wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.

E. Install fabricated bar mats in lengths as long as practicable. Handle units to keep them flat and free of distortions. Straighten bends, kinks, and other irregularities, or replace units as required before placement. Set mats for a minimum 2-inch (50-mm) overlap of adjacent mats.

JOINTS
A. General: Form construction, isolation, and contraction joints and tool edgings true to line with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline, unless otherwise indicated.

1. When joining existing pavement, place transverse joints to align with previously placed joints, unless otherwise indicated.

Page 152 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
116
B. Construction Joints: Set construction joints at side and end terminations of pavement and at locations where pavement operations are stopped for more than one-half hour unless pavement terminates at isolation joints.

1. Continue steel reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of pavement strips, unless otherwise indicated.

2. Provide tie bars at sides of pavement strips where indicated.

3. Butt Joints: Use epoxy bonding adhesive at joint locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

4. Keyed Joints: Provide preformed keyway-section forms or bulkhead forms with keys, unless otherwise indicated. Embed keys at least 1-1/2 inches (38 mm) into concrete.

5. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or asphaltcoat one-half of dowel length to prevent concrete bonding to one side of joint.

C. Isolation Joints: Form isolation joints of preformed joint-filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, walks, other fixed objects, and where indicated.

1. Locate expansion joints at intervals of 30 feet, unless otherwise indicated.

2. Extend joint fillers full width and depth of joint.

3. Terminate joint filler not less than 1/2 inch or more than 1 inch below finished surface if joint sealant is indicated.

4. Place top of joint filler flush with finished concrete surface if joint sealant is not indicated.

5. Furnish joint fillers in one-piece lengths. Where more than one length is required, lace or clip joint-filler sections together.

6. Protect top edge of joint filler during concrete placement with metal, plastic, or other temporary preformed cap. Remove protective cap after concrete has been placed on both sides of joint.

D. Contraction Joints: Form weakened-plane contraction joints, sectioning concrete into areas as indicated.

Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness, as follows:

1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint with grooving tool to radius indicated. Repeat grooving of contraction joints after applying surface finishes.

Eliminate groover marks on concrete surfaces.

2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamondrimmed blades. Cut 1/8-inch-wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before developing random contraction cracks.

3. Doweled Contraction Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or asphalt coat one-half of dowel length to prevent concrete bonding to one side of joint.

Page 153 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
117
E. Edging: Tool edges of pavement, gutters, curbs, and joints in concrete after initial floating with an edging tool to a 1/4-inch radius. Repeat tooling of edges after applying surface finishes. Eliminate tool marks on concrete surfaces.

A.

CONCRETE PLACEMENT
A. Inspection: Before placing concrete, inspect and complete formwork installation, steel reinforcement, and items to be embedded or cast in. Notify other trades to permit installation of their work.

B. Remove snow, ice, or frost from subbase surface and reinforcement before placing concrete. Do not place concrete on frozen surfaces.

C. Moisten subbase to provide a uniform dampened condition at time concrete is placed. Do not place concrete around manholes or other structures until they are at required finish elevation and alignment.

D. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete.

E. Do not add water to concrete during delivery or at Project site.

F. Do not add water to fresh concrete after testing.

G. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place.

H. Consolidate concrete according to ACI 301 by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping.

1. Consolidate concrete along face of forms and adjacent to transverse joints with an internal vibrator. Keep vibrator away from joint assemblies, reinforcement, or side forms. Use only square-faced shovels for hand spreading and consolidation. Consolidate with care to prevent dislocating reinforcement, dowels, and joint devices.

I. Screed pavement surfaces with a straightedge and strike off.

J. Commence initial floating using bull floats or darbies to impart an open textured and uniform surface plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete surfaces before beginning finishing operations or spreading surface treatments.

K. Hot-Weather Placement: Comply with ACI 301 and as follows when hot-weather conditions exist:

1. Cool ingredients before mixing to maintain concrete temperature below 90 deg F (32 deg C) at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.

2. Cover steel reinforcement with water-soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete.

Page 154 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
118

3. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas.

A.

CONCRETE FINISHING
A. General: Do not add water to concrete surfaces during finishing operations.

B. Sandblast Textured Finishes (Concrete Type 1 & 2)

1. Perform abrasive blast finishing in as continuous an operation as possible, utilizing same work crew to maintain continuity of finish on each surface or area of work.

2. Use abrasive grit of proper type and gradation to expose fine aggregate and surrounding matrix surfaces to match approved mock-up panels.

3. Determine type of nozzle, nozzle pressure, and blasting techniques required to match approved mock-up panels.

4. Abrasive blasting of surfaces shall be done on concrete surfaces of approximately the same age. Required age of concrete shall be determined by small sample and the field constructed mock-up panel.

5. All work shall conform to CAL OSHA /MSDS for application and clean up procedures.

6. After concrete has cured, in approximately 30 days after being poured, provide a sandblast- textured finish to expose the desired aggregates below the concrete surface.

C. Medium Broom Finish (Concrete Type 3)
a. Draw a soft bristle broom across float-finished concrete surface perpendicular to line of traffic to provide a uniform, fine-line texture.
b. Match approved samples and field mockups, to compare for color(s), texture(s), finish(es), and other characteristics relating to aesthetic effects.

D. Slip-Resistive Aggregate Finish: Before final floating, spread slip-resistive aggregate finish on pavement surface according to manufacturer's written instructions.

1. Cure concrete with curing compound recommended by slip-resistive aggregate manufacturer. Apply curing compound immediately after final finishing.

2. After curing, lightly work surface with a steel wire brush or abrasive stone and water to expose nonslip aggregate.

CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

Page 155 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
119
B. Comply with ACI 306.1 for cold-weather protection.

C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h (1 kg/sq. m x h) before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.

E. Curing Methods: Cure concrete by moisture curing, moisture-retaining-cover curing, curing compound, or a combination of these as follows:

1. Moist Curing: Keep surfaces continuously moist for not less than seven days with the following materials:
a. Water.
b. Continuous water-fog spray.
c. Absorptive cover, water saturated and kept continuously wet. Cover concrete surfaces and edges with 12-inch (300-mm) lap over adjacent absorptive covers.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches (300 mm), and sealed by waterproof tape or adhesive. Immediately repair any holes or tears during curing period using cover material and waterproof tape.

3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.

PAVEMENT TOLERANCES
A. Comply with tolerances of ACI 117 and as follows:

1. Elevation: 1/4 inch.

2. Thickness: Plus 3/8 inch, minus 1/4 inch.

3. Surface: Gap below 10-foot-long, unleveled straightedge not to exceed 1/4 inch.

4. Lateral Alignment and Spacing of Tie Bars and Dowels: 1 inch.

5. Vertical Alignment of Tie Bars and Dowels: 1/4 inch.

6. Alignment of Tie-Bar End Relative to Line Perpendicular to Pavement Edge: 1/2 inch.

7. Alignment of Dowel-Bar End Relative to Line Perpendicular to Pavement Edge: Length of dowel 1/4 inch per 12 inches.

8. Joint Spacing: ¬Ω inch.

Page 156 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
120

9. Contraction Joint Depth: Plus 1/4 inch, no minus.

10. Isolation Joint Width: Plus 1/8 inch, no minus.

FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:

1. Testing Frequency: Obtain at least 1 composite sample for each 5000 sq. ft. or fraction thereof of each concrete mix placed each day.
a. When frequency of testing will provide fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mix. Perform additional tests when concrete consistency appears to change.

3. Air Content: ASTM C 231, pressure method; one test for each composite sample, but not less than one test for each day's pour of each concrete mix.

4. Concrete Temperature: ASTM C 1064; one test hourly when air temperature is 40 deg F (4.4 deg C) and below and when 80 deg F (27 deg C) and above, and one test for each composite sample.

5. Compression Test Specimens: ASTM C 31/C 31M; cast and laboratory cure one set of three standard cylinder specimens for each composite sample.

6. Compressive-Strength Tests: ASTM C 39/C 39M; test 1 specimen at 7 days and 2 specimens at 28 days. a. A compressive-strength test shall be the average compressive strength from 2 specimens obtained from same composite sample and tested at 28 days.

C. Strength of each concrete mix will be satisfactory if average of any 3 consecutive compressive- strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi (3.4 MPa).

D. Test results shall be reported in writing to Owner's Authorized Representative, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.

Page 157 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
121
E. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Owner's Authorized Representative but will not be used as sole basis for approval or rejection of concrete.

F. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Owner's Authorized Representative.

G. Remove and replace concrete pavement where test results indicate that it does not comply with specified requirements.

H. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

A.

REPAIRS AND PROTECTION
A. Remove and replace concrete pavement that is broken, damaged, or defective or that does not comply with requirements in this Section.

B. Protect concrete from damage. Exclude traffic from pavement for at least 14 days after placement.

C. Maintain concrete pavement free of stains, discoloration, dirt, and other foreign material. Sweep concrete pavement not more than two days before date scheduled for Substantial Completion inspections.

8.9. Concrete Paving Joint Sealants

GENERAL

SUMMARY
A. This Section includes all services, labor, materials, transportation, and equipment necessary to perform the Work indicated on the Contract Drawings and specified herein this Section, as required to properly constructing site exterior horizontal and vertical joint sealants for the following:

1. Exterior joints in the following horizontal surfaces:
a. Control, expansion, and isolation joints in cast-in-place concrete pavement. b. Joints between different materials.

2. Other joints, as indicated.

B. Related Documents:

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions. b. The Drawings.
c. Division 01 Specification Sections and related requirements in other sections of the Project Manual.

Including but not limited;

Page 158 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
122
I. Section 321313 Concrete Paving
d. Related requirements in other Contract Documents listed in the Agreement.

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

REFERENCES
A. ASTM: American Society for Testing and Materials

1. ASTM D2628: Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements

2. ASTM D2835: Standard Specification for Lubricant for Installation of Preformed Compression Seals in Concrete Pavements
B. CRD: U.S. Army Corps of Engineers Concrete Research Division

1. CRD C548: Handbook for Concrete and Cement Standard Specification for Jet-Fuel and Heat-Resistant Preformed Polychloroprene Elastomeric Joints Seals for Rigid Pavement

SUBMITTALS
A. Product Data: For each joint-sealant product indicated.

B. Samples for Verification: For each type and color of joint sealant required. Install joint-sealant samples in 1/2- inch-wide joints formed between two (2) 6-inch-long strips of material matching the appearance of exposed surfaces adjacent to joint sealants.

A. Sand or Grout Mixture for Cobble Band Expansion Joints: Provide a quarter (.25) LB sample of sand or grout mixture suitable for sanding the surface of joint sealant at Cobble Bands.

B. Product Certificates: Signed by manufacturers of joint sealants certifying that products furnished comply with requirements and are suitable for the use indicated.

C. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and Citys, and other information specified.

D. Compatibility and Adhesion Test Reports: From joint sealant manufacturer indicating the following:

1. Materials forming joint substrates and joint-sealant backer materials have been tested for compatibility and adhesion with joint sealants.

2. Interpretation of test results and written recommendations for primers and substrate preparation needed for adhesion.

Page 159 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
123
E. Product Test Reports: From a qualified testing agency indicating joint sealants comply with requirements, based on comprehensive testing of current product formulations.

QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer who has specialized in installing joint sealants similar in material, design, and extent to those indicated for this Project and whose work has resulted in joint-sealant installations with a record of successful in-service performance.

B. Source Limitations: Obtain each type of joint sealant through one (1) source from a single manufacturer.

C. Product Testing: Obtain test results for "Product Test Reports" Paragraph in "Submittals" Article from a qualified testing agency, based on testing current sealant formulations within a 36-month period.

1. Testing Agency Qualifications: An independent testing agency qualified according to ASTM C 1021 to conduct the testing indicated, as documented according to ASTM E 548.

2. Test elastomeric joint sealants for compliance with requirements specified by reference to ASTM C 920, and where applicable, to other standard test methods.

D. Performance Requirements: Provide elastomeric joint sealants that establish and maintain watertight and airtight continuous seals without staining or deteriorating joint substrates.

E. Preconstruction Compatibility and Adhesion Testing: Submit to joint sealant manufacturer, for testing indicated below, samples of materials that will contact or affect joint sealants.

1. Use manufacturer's standard test methods to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint substrates.

2. Submit each type of material, including joint substrates, joint-sealant backer materials, secondary seals, and miscellaneous material.

3. Schedule sufficient time for testing and analyzing results to prevent delaying the Work.

4. For materials failing tests, obtain joint sealant manufacturer's written instructions for corrective measures, including the use of specially formulated primers.

5. Testing will not be required if joint sealant manufacturer submits joint preparation data that are based on previous testing of current sealant products for adhesion to, and compatibility with, joint substrates and other materials matching those submitted.

F. Field-Constructed Mock-up Paving Samples: Include joint sealants, in each color/ pattern as required, in all FieldConstructed Mock-up Paving Samples as indicated in Section 321313, Concrete Paving. Approval of FieldConstructed Mock-up Paving Samples shall constitute approval of joint sealant materials prior to beginning of Work herein this Section.

1. Provide joint sealant at concrete to match color of concrete. a.

Page 160 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
124

FIELD CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions

1. When ambient and substrate temperature conditions are outside limits permitted by joint- sealant manufacturer.

2. When joint substrates are wet.

3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.

4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.

DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to Project Site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing instructions for multicomponent materials.

B. Store and handle materials to comply with manufacturer's written instructions to prevent their deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.

WARRANTY
A. Special Installer’s Warranty: Written warranty, signed by Installer, agreeing to repair or replace elastomeric joint sealants that do not comply with performance and other requirements specified herein this Section within specified warranty period

1. Warranty Period: Two (2) years from date of Substantial Completion.

PART 2 - PRODUCTS

MANUFACTURERS
A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products listed in other Part 2 articles.

B. Products: Subject to compliance with requirements, provide one of the products listed in other Part 2 articles.

MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backing materials, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by jointsealant manufacturer based on testing and field experience.

Page 161 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
125

ELASTOMERIC JOINT SEALANTS
A. Multi-Part Elastomeric Joint Sealant Standard for Concrete and Masonry: Pourable, chemically curing elastomeric formulation complying with the following requirements for formulation and with ASTM C 920 for type, grade, class, and uses indicated:

1. Multi-Component Urethane Sealant: Except as otherwise indicated, provide manufacturer’s standard, nonmodified, three-component material (base, activator, and color catalyst), urethane-based, elastomeric sealant: Gun-grade, Type M (multi- component), Grade NS, Class 25, Type II. a. Acceptable Products:“Lithoseal™Trafficalk-3G™”, L.M. Scofield Company. b. or equal (no known equal)

JOINT-SEALANT BACKER MATERIALS
A. General: Provide joint-sealant backer materials that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by joint-sealant manufacturer based on field experience and laboratory testing.

B. Plastic Foam Joint Fillers: Preformed, compressible, resilient, non-staining, non-waxing, non- extruding strips of flexible plastic foam, either open-cell polyurethane foam or closed-cell polyethylene foam, subject to approval of sealant manufacturer, for cold-applied sealants only. Polystyrene foam is not acceptable.

C. Elastomeric Tubing Joint Fillers: Neoprene, butyl, EPDM, or silicone tubing complying with ASTM D 1056, nonabsorbent to water and gas, and capable of remaining resilient at temperatures down to minus 26d F.

Provide products with low compression set and of size and shape to provide a secondary seal, to control sealant depth, and otherwise contribute to optimum sealant performance.

D. Bond-Breaker Tape: Polyethylene tape or other plastic tape as recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self- adhesive tape where applicable.

MISCELLANEOUS MATERIALS
A. Primer: Product recommended by joint sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint- sealant-substrate tests and field tests.

B. Cleaners for Non-porous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants with joint substrates.

Page 162 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
126
C. Masking Tape: Non-staining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.

D. Sand: Clean, washed, fine-textured plaster sand, with neutral pH and no salinity. Sieve analysis at 100% passing a no. 4 sieve

1. PART 3 - EXECUTION

EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint- sealant performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint sealant manufacturer's written instructions and the following requirements:

1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatability by sealant manufacturer), old joint sealant, oil grease, waterproofing, water repellents, water, surface dirt, and stones.

2. Clean porous joint substrate surfaces by brushing, sweeping, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil- free compressed air. Porous joints include the following:
a. Concrete.
b. Masonry.

3. Remove laitance and form-release agents from concrete.

4. Clean non-porous surfaces with chemical cleaners or other means that do not stain, harm, or leave residues capable of interfering with adhesion of joint sealants. Non-porous joints include the following:
a. Metal
b. Glass
B. Joint Priming: Prime joint substrates where indicated or where recommended in writing by joint sealant manufacturer, based on preconstruction joint-sealant-substrate tests or prior experience. Apply primer to

Page 163 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
127
comply with joint sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.

C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.

INSTALLATION
A. General: Comply with joint sealant manufacturer's written installation instructions applicable to products and applications indicated, unless more stringent requirements apply B. Sealant Installation Standard: Comply with recommendations of ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.

C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

1. Do not leave gaps between ends of backer materials.

2. Do not stretch, twist, puncture, or tear backer materials.

3. Remove absorbent backer materials that have become wet before sealant application and replace them with dry materials.

D. Install bond breaker tapes behind sealants where sealant backings are not used between sealants and back of joints.

E. Install sealants by proven techniques to comply with the following and at the same time backings are installed:

1. Place sealants so they directly contact and fully wet joint substrates.

2. Completely fill recesses provided for each joint configuration.

3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.

F. Tooling of Non-Sag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.

1. Remove excess sealants from surfaces adjacent to joint.

2. Use tooling agents that are approved in writing by joint sealant manufacturer and that do not discolor sealants or adjacent surfaces.

G. Provide joint configuration to comply with joint sealant manufacturer's written instructions, unless otherwise indicated.

Page 164 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
128
H. Provide recessed joint configuration for silicone sealants of recess depth and at locations indicated.

I. Apply sand or grout mixture by hand to sealant surface at cobble band expansion joints. Sealant shall be uncured and able to accept and retain dusting of material.

J. Lightly apply silica sand to all joints (except cobble band joint per #G above) once tooling sealants has been performed.

CLEANING
A. Clean off excess sealants or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved by manufacturers of joint sealants and of products in which joints occur.

PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from the original Work.

EXTRA MATERIAL
A. Contractor shall supply City with six (6) extra packages of each sealant type and color specified prior to Substantial Completion of the project.

8.10. Stamped Concrete Paving
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Planting” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #13 Stamp Concrete Type 1 w/6" AB (Brick Substitute) SF Bid Item #13 Stamp Concrete Type 2 w/6" AB (Brick Substitute) SF

SUMMARY
A. This Section includes all materials, labor, transportation, services, and equipment necessary to color and finish exterior, plaza, cast-in-place concrete as shown on the Contract Drawings, and as specified herein this Section. This Section includes the following:

Page 165 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
129

1. Stamped Concrete Paving
B. Related Documents:

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions. b. The Drawings.
c. Division 01 Specification Sections and related requirements in other sections of the Project Manual.

Including but not limited;
I. Section 321616 Concrete Paving
II. Section 321373 Concrete Paving Joint Sealants
d. Related requirements in other Contract Documents listed in the Agreement.

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, expansive hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume.

SUBMITTALS
A. Product Data: For each type of manufactured material and product indicated.

B. Design Mixtures: For each concrete pavement mixture. Include alternate mixture designs when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

C. Qualification Data: For manufacturer and testing agency.

D. Material Test Reports: From a qualified testing agency indicating and interpreting test results for compliance of the following with requirements indicated, based on comprehensive testing of current materials:

E. Material Certificates: Signed by manufacturers certifying that each of the following materials complies with requirements:

1. Dry-shake colored hardener

2. Antiquing release agent

3. Liquid release agent

4. Imprinting/Texturing tools

5. Curing compound and sealer
F. Design Mixes: For each type of concrete.

Page 166 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
130
G. Samples for Initial Selection: Manufacturer's color charts showing full range of colors available.

H. Field quality-control test reports.

I. Minutes of preinstallation conference.

QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer of ready-mixed concrete products who complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA’s “Certification of Ready Mixed Concrete Production Facilities.” A. Testing Agency Qualifications: An independent agency qualified according to ASTM C 1077 and ASTM E 329 for testing indicated, as documented according to ASTM E 548.

1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-01 or an equivalent certification program.

B. ACI Publications: Comply with ACI 301, "Specification for Structural Concrete," unless modified by requirements in the Contract Documents.

C. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures.

D. Stamped Concrete Paving Mockups:

1. Construct a 10 foot by 10 foot mockup at location selected by Architect.

2. Provide individual mockups for each color and pattern required.

3. Construct mockup using materials, processes, and techniques required for the work, including curing procedures. Incorporate representative control, construction, and expansion joints according to Project requirements. Installer for the work to construct mockup.

4. Notify Architect and Owner a minimum of seven calendar days in advance of the date scheduled for each mockup construction.

5. Obtain the Architect's and Owner's acceptance of each mockup prior to commencement of the work.

6. Each mockup to remain until completion of the work to serve as a quality control standard for the work. Provide suitable protections to preclude damage to mockup.

7. Demolish and remove each mockup from site when directed.

E. Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination."

1. Before submitting design mixtures, review concrete pavement mixture design and examine procedures for ensuring quality of concrete materials and concrete pavement construction practices. Require representatives, including the following, of each entity directly concerned with concrete pavement, to attend conference:

Page 167 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
131
a. Contractor's superintendent.
b. Independent testing agency responsible for concrete design mixtures. c. Ready-mix concrete producer.
d. Concrete pavement subcontractor.

1. a.

PROJECT CONDITIONS
G. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities.

PART 2 - PRODUCTS

ACCEPTABLE MANUFACTURERS
A. Basis of Design: Provide products specified herein manufactured by Sika Corporation.

MATERIALS
A. Dry-Shake Colored Hardener: Cementitious material containing special hard aggregates, formulated as a high opacity color hardening material for the top surface of freshly place concrete substrates. Highly UVresistant. Factory proportioned, mixed and packaged, ready-to-use. Comply with ASTM C 979.

1. Product: "LITHOCHROME Color Hardener", Sika Corporation.

2. Colors:
a. Stamped Concrete Type 1 – Brick Pattern Tan color: Scofield Weat Fields or equal b. Stamped Concrete Type 2 – Brick Pattern Red Color : Scofield117 Spring Rose or equal .

3. Imprinting Tools: System of matched tools for imparting textures and patterns into freshly placed concrete surfaces.

4. Product: "LITHOTEX Pavecrafters", Sika Corporation.

5. Patterns:
a. New Brick Herringbone Pattern # S6000 or equal
I. Recommended Contractor Set: 10 Rigid, 2 Flex, 1 Skin, 1 Roller Sleeve II. Suggested Touch-up and Detailing Tools: Touch-up Texture Skin: New Brick – S7318-TS Touch-up Texture Roller Sleeve: New Brick – SR0960 Chisels: 2", 4", & 8" Touch-up Wheel: 3/16" or 3/8 III. Grout Line Width: 1/4"-3/8", Brick Size: 7 5/8" x 3 3/4"

6. Border Patterns

Page 168 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
132
a. New Brick Sailor Course Pattern # S6950 or equal
b. Additional Tools:

I. Single Brick Set – S6955
II. Recommended Contractor Set: 2 Rigid, 1 Flex, 1 Single Brick Set, 1 Skin, 1 Roller Sleeve III. Suggested Touch-up and Detailing Tools:
i. Touch-up Texture Skin: New Brick – S7318-TS
ii. Touch-up Texture Roller Sleeve: New Brick – SR0960
iii. Chisels: 2", 4", & 8" Touch-up Wheel: 3/16" or 3/8" IV. Grout Line Width: 1/4"-3/8", Grout Line Depth: 1/8"-3/16", Brick Size: 7 5/8" x 3 3/4" B. Liquid Release Agent: Colorless, scented liquid formulated to break the bond between imprinting tools and surface of color-hardened concrete. Evaporates completely, leaving no residue.

1. Product: "SCOFIELD Liquid Release BG", Sika Corporation.

C. Waterborne Curing Compound and Sealer: Low VOC waterborne modified acrylic formulation. Complies with ASTM C 309.

1. Product: "SCOFIELD Cureseal-W", Sika Corporation.

D. CONCRETE MIX DESIGN

1. General: Refer to Section 321313 "Concrete Paving" for basic concrete paving requirements, including formwork, reinforcement, concrete materials, and mixing.

2. Minimum Cement Content: 5-1/2 sacks per cubic yard of concrete.

3. Mix design must not permit segregation of concrete materials during pumping, placing, or consolidation of concrete. Slump not to exceed 4 inches.

4. Admixtures:
a. A normal or retarded-set, water-reducing admixture is permissible. b. An air-entraining admixture complying with ASTM C 260 is acceptable where freeze/thaw durability is required.
c. A nonchloride accelerator is acceptable for cold weather concrete placement. d. Do not add a high-range water reducing admixture (superplasticizer).

5. Do not add calcium chloride to concrete mix.

6. Use of fly ash as a cement replacement may be acceptable, subject to manufacturer's current recommendations.

Page 169 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
133

7. Do not add water to the mix in the field.

PART 3 - EXECUTION

EXAMINATION
A. General: Refer to Section 321313 "Concrete Paving" for basic concrete paving execution.

B. Subgrade to receive stamped concrete paving work must be well drained and have adequate, uniform loadbearing characteristics.

1. Verify grading will ensure a uniform concrete thickness during concrete placement.

C. At the time of concrete placement, subgrade must be moist, completely consolidated, and free from frost. If necessary, subgrade may be dampened with water prior to placement; however, freestanding water or soft, muddy, or frozen ground in not permissible.

CONCRETE PLACEMENT
A. General: Place and spread concrete to completely fill all space inside forms. Move concrete into place with square-tipped shovels or concrete rakes.

B. Consolidate concrete by tamping or vibrating to provide a suitable surface for finishing.

C. Prior to appearance of excess moisture or bleed water, screed concrete with wood or magnesium straight edge or mechanical vibrating screed.

D. Continue concrete surface leveling and consolidation with highway magnesium straight edge and (or) magnesium bull float.

E. Mechanically float concrete surfaces to required flatness and levelness as soon as concrete surface has taken its initial set and will support weight of a power float machine equipped with float shoes or combination blades and operator.

1. Comply with ACI 302.1R for acceptable tolerances.

F. Completed concrete placement to result in an open surface suitable to receive colored hardener.

STAMPED CONCRETE PAVING INSTALLATION
A. Apply 2/3 of dry-shake colored hardener at specified application rate to freshly floated concrete surface. Bleed water must not be present during or following application of first and second dry-shake applications.

B. Do not throw dry-shake colored hardener material; distribute evenly by hand or mechanical spreader designed to apply floor hardeners. Mechanical spreader manufacturer as acceptable to stamped concrete paving manufacturer.

C. As soon as dry-shake material has absorbed moisture, indicated by uniform darkening of surface, mechanically float concrete surface a second time, just enough to bring moisture from base slab through dry-shake color hardener.

Page 170 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
134
D. Immediately following second floating, apply remaining 1/3 of dry-shake colored hardener at specified application rate. If applied by hand, broadcast in opposite direction of first application for a more uniform coverage. If a mechanical spreader is used, apply in same manner as previously described.

E. As soon as dry-shake material has absorbed moisture, mechanically float concrete surface a third time.

F. Do not add water to the surface.

G. Begin imprinting operations immediately after applying dry-shake colored hardener, according to manufacturer's written instructions, including application of powder antiquing release agent.

SEALING
A. Prior to sealing, the following conditions must be present:

1. Release agent has been removed.

2. Moisture content of concrete is low enough that alkali and other salts do not become trapped beneath sealer. This will require a minimum of 28 days subsequent to concrete placement, or longer if required.

3. No evidence of free water on concrete surfaces to receive curing and sealing compound.

B. Seal imprinted concrete with liquid membrane curing and sealing compounds as recommended by manufacturer.

C. Apply two coats of specified curing and sealing compound according to manufacturer's written instructions.

PROTECTION OF FINISHED WORK
A. Prohibit foot or vehicular traffic on the newly imprinted concrete surface.

B. Protect floor surface from damage throughout remainder of construction period until Final Acceptance of the work. If a covering material is necessary, surfaces must remain uncovered for a minimum of four days after which they may be covered with a new, smooth, nonstaining reinforced kraft curing paper. Plastic sheeting is unacceptable as a covering material.

SCHEDULE
A. Refer to Drawings for locations of stamped concrete paving applications.

8.11. Planting
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Planting” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #9 Soil Preparation LS
Bid Item #16 Top Soil LS

Page 171 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
135

SUMMARY
A. This section describes planting trees, shrubs, and ground cover, including mulching, pruning, guying, and staking.

B. Related Documents:

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions. b. The Drawings.
c. Division 01 Specification Sections and related requirements in other sections of the Project Manual. d. Related requirements in other Contract Documents listed in the Agreement.

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

A.

REFERENCES
A. General:

1. The following documents form part of the Specifications to the extent stated. Bring conflicts between Specifications, Drawings, and the referenced documents to the attention of the Architect, in writing, for resolution before taking any related action. Where differences exist between codes and standards, the one affording the greatest protection shall apply.

2. If the year of the adoption or latest revision is omitted from the designation, it shall mean the specification, manual or test designation in effect the date the Notice to Proceed with the Work is given.

B. Standards

1. All plant material shall be true to botanical and common name as indicated in the following:
a. Sunset Western Garden Book, Sunset Publishing Corporation, 2001. b. American Standard for Nursery Stock, ANSI Z60.1-1966, edition approved November 6, 1996, American Association of Nurserymen, and American National Standards Institute.

2. All plant material shall conform to the California State Department of Agriculture’s regulations for nursery inspections, rules, and ratings.

C. Section Includes:

1. Fine Grading.

2. Soil Preparation.

Page 172 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
136

3. Pre Plant Weed Control.

4. Tree, Shrub, Groundcover, Bulb, and Vine Planting.

5. Staking, Tying, Guying, and Wrapping.

6. Topsoil.

7. Soil Conditioners, Amendments, and Fertilizers.

8. Mulches (wood products, aggregates, etc.).

9. Erosion Control Materials.

10. Rodent, Rabbit, Deer, and Pest Control.

1. PROJECT CONDITIONS
A. Site shall be free of weeds, native grasses, Bermuda grass, and Kikuyu grass prior to any planting or soil amendment placement.

B. All rock and other growth or debris accumulated throughout the duration of the project shall be removed from the Project Site by the Contractor.

C. Prior to excavation for planting or placing of plant materials, the Contractor shall locate all underground utility lines still in use and take proper precautions to avoid damage to such improvements. In the event of a conflict between such lines and plant material locations, the Contractor shall notify the Owner’s Authorized Representative who shall arrange for the relocation of one or the other. The Contractor assumes all responsibility for making any or all repairs for damages resulting from Work as specified herein.

D. Excavation: When conditions detrimental to plant growth are encountered, such as rubble fill, adverse drainage conditions, or obstructions, cease planting operations and notify Owner’s Authorized Representative for further direction.

E. Grading and soil preparation work shall be performed only during the period when beneficial and optimum results may be obtained. If the moisture content of the soil should reach such a level that working it would destroy soil structure or cause compaction, spreading and grading operations shall be suspended until, in the opinion of the Owner’s Authorized Representative, the moisture content is increased or reduced to acceptable levels and the desired results are likely to be obtained.

F. Contractor shall coordinate all drainage work with the other trades. Established site drainage shall be maintained by the Contractor during all phases of landscape construction.

G. Grade all areas by filling and/or removing surplus soil as needed to insure proper grades and drainage as indicated on the plans. Unless otherwise noted, soil finish grades shall be below hardscape areas as follows:

1. Three inches (3”) for all planting areas.

Page 173 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
137
H. All undulations and irregularities in the planting surfaces resulting from tillage, rototilling, and all other operations, and all ridges and rises which are visually evident and would effect the maintenance of any planting area, shall be leveled and floated out before planting operations are initiated.

I. Final finish grades shall insure positive drainage of the Project Site with all surface drainage away from buildings, walls, and toward driveways, drain inlets, and catch basins.

1. Final grades shall be acceptable to the Owner’s Authorized Representative before planting operations will be allowed to commence.

2. The above conditions shall also apply to the final finish grade at the time of project completion.

J. Actual planting shall be performed during those periods when weather and soil conditions are suitable in accordance with locally-accepted horticultural practice as approved by the Owner’s Authorized Representative.

K. All scales dimensions are approximate. Before proceeding with any Work, the Contractor shall carefully check and verify all dimensions and shall immediately notify the Owner’s Authorized Representative of any discrepancy between the Contract Drawings and/or Contract Specifications and the actual Project Site conditions.

L. Quantities of plant materials are shown for the Contractor’s convenience only, and are not guaranteed. The Contractor shall check and verify count, and shall furnish a sufficient number of plant materials as needed to fulfill the intent and complete the Work as shown in the Contract Drawings. Plan plant symbol quantities shall take precedence over quantities indicated in the Plant List and Plan callouts M. Contractor shall make arrangements to have a complete set of Contract Drawings and Contract Specifications at the Project Site at all times during Work under this Section.

N. As-Built Plans: As-Built Plans shall be prepared by the Contractor indicating any deviations in Work described herein and on the Contract Drawings, with respect to changes in materials, plant species, sizes, locations, and alignments. As-Built Plans shall be prepared by marking the changes on a conformed set of Xerox type prints in red ink. Provide As-Built Plans to the City at the end of the contracted Maintenance Period.

DEFINITIONS
A. Backfill: The earth used to replace or the act of replacing earth in an excavation.

B. Finish Grade: Elevation of finished surface of planting soil.

C. Manufactured Topsoil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

D. Planting Soil: Native or imported topsoil, manufactured topsoil, or surface soil modified to become topsoil; mixed with soil amendments.

E. Subgrade: Surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill, before placing planting soil.

Page 174 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
138
F. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms.

SUBMITTALS
A. General

1. Product certificates, legible, signed by manufacturer, certifying that their products comply with specified requirements. Certificates shall include grades, analysis, amount, supplier, species, type, size, and quantity where applicable.

2. Manufacturer's certified analysis for standard products.

3. Analysis for other materials by a recognized laboratory made according to methods established by the Association of Official Analytical Chemists, where applicable.

4. Label data substantiating that plants, trees, shrubs, and planting materials comply with specified requirements.

5. Soil amendment receipts containing analytical data.

6. Receipts from the soil supplier of all soil mixes specified in this Section.

7. At least one (1) plant of each species delivered to the project site shall have an identification tag from supplying nursery showing botanical and common name of plant.

8. List of all proposed landscape materials indicated by description, manufacturer, and model number. Include catalog cuts and manufacturer's current printed instructions of all material items described herein this Section.

9. List of all trees, shrubs, ground covers, vines, annuals, indicated by botanical name, common name, height, spread, caliper, container size, nursery, and location, contact person at nursery, and any specific remarks (i.e. "unable to locate", "photo submitted", etc.) The list shall be accompanied with color photographs of each tree type. Include a person or tape measurer in each photograph for scale purposes. Approval of photographs, however, does not indicate acceptance of plant material on site.

10. Submit certificates of compliance and invoices for soil amendments, fertilizers, and plant materials, with quantities of each.

B. Samples:

1. ½ cubic foot each of landscape mulch materials, i.e. shredded bark mulch, aggregate, etc. in labeled plastic bags.

2. 1/2 cubic foot of imported topsoil in a labeled plastic bag.

3. Edging materials and accessories, of manufacturer's standard size, to verify color selected.

4. One (1) tree tie each type used (do not include stake)

Page 175 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
139

5. Photographs of all tree material: A person is to be included with the photos for scale relationship Product certificates
C. Planting Schedule: Indicating anticipated planting dates locations for each type of planting D. Maintenance Instructions: Recommended procedures to be established by Owner for maintenance of exterior plants during a calendar year. Submit before expiration of required maintenance periods.

E. Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and address of architects and Citys, and other information specified.

F. Immediately following site grading and prior to commencing soil preparation and any landscape planting operation(s), Contractor shall provide the horticultural soils fertility test and percolation test results to the City to verify required amendment types and quantities as specified:

G. Soil Fertility Tests, as described herein this Section.

H. Soil Percolation Tests, as described herein this Section I. Warranty: Sample of special warranty

QUALITY ASSURANCE
A. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when planting is in progress.

B. Topsoil Analysis: Furnish soil analysis by a qualified soil-testing laboratory.

1. Report suitability of topsoil for plant growth. State-recommended quantities of nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory topsoil.

C. Provide quality, size, genus, species, and variety of exterior plants indicated, complying with applicable requirements in ANSI Z60.1, "American Standard for Nursery Stock." D. Preinstallation Conference: Conduct conference at project site E. Regulatory Requirements:

1. Contractor shall meet the requirements of applicable laws, codes, and regulations as required by the authorities having jurisdiction over the Work.

F. Manufacturer’s Directions: Follow manufacturer’s directions and drawings in all cases where the manufacturer’s of articles used in this Section furnish directions covering points not shown in the Contract Drawings and Contract Specifications.

G. Permits, Fees, Bonds, and Inspections: The Contractor shall arrange and pay for any and all permits, fees, bonds, and inspections necessary to perform and complete his portion of the Work.

H. Contract Drawings and Contract Specifications:

Page 176 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
140

1. Comply with the intent and meaning of Contract Drawings and Contract Specifications taken as a whole, not taking advantage of any readily perceived error or omission shall any exist.

2. Figures and dimensions on Contract Drawings shall take precedence over measurements by scale, and detailed drawings shall take precedence over general drawings.

3. Refer any errors and discrepancies in or between plans, specifications, lists, or notes to the Owner’s Authorized Representative for adjustments or clarification before proceeding with the Work. In the event of errors or discrepancies, the Contractor shall assume responsibility for work performed without referring to the Owner’s Authorized Representative for clarification.

4. The Owner’s Authorized Representative shall interpret the meaning of the Contract Drawings and Contract Specifications in the event of conflict, and his/her decision shall be final.

DELIVERY, STORAGE, AND HANDLING
A. Do not prune trees and shrubs before delivery. Protect bark, branches, and root systems from sun scald, drying, sweating, whipping, and other handling and tying damage. Do not bend or bind- tie trees or shrubs in such a manner as to destroy their natural shape. Provide protective covering of exterior plants during delivery. Do not drop exterior plants during delivery and handling.

B. Handle planting stock by root ball.

C. Deliver exterior plants after preparations for planting have been completed and install immediately. If planting is delayed more than six hours after delivery, set exterior plants and trees in shade, protect from weather and mechanical damage, and keep roots moist.

D. Labeling: Furnish standard products in manufacturer's standard containers bearing original labels legibly showing quantity, analysis, genus/species and name of manufacturer/grower.

E. Deliver trees, shrubs, ground covers, and plants after preparations for planting have been completed and install immediately. If planting is delayed more than six (6) hours after delivery, set planting materials in shade, protect from weather and mechanical damage, and keep roots moist. Anchor plants to prevent damage from winds.

1. DO NOT remove container-grown stock from containers before time of planting.

2. Water root systems of trees and shrubs stored on site with a fine-mist spray. Water as often as necessary to maintain root systems in a moist condition.

SEQUENCING AND SCHEDULING
A. Acceptance: Do not install plant materials prior to acceptance of finish grades and main line trenching/installation of irrigation system.

B. Coordination: Coordinate with work of other sections to insure the following sequence of events:

Page 177 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
141

1. General: Sprinkler system to be installed and operable prior to installation of plant materials. Schedule hand watering of all plant materials installed prior to sprinkler irrigation system.

2. Plants in Pots: Schedule delivery of plants to coincide with installation of pots.

3. Headers: Install prior to installation of adjacent sprinkler irrigation system.

4. Pruning: Do not prune plant materials prior to installation and acceptance. Request review by Landscape Architect prior to pruning.

WARRANTY
A. Special Warranty: Installer's standard form in which Installer agrees to repair or replace plantings that fail in materials, workmanship, or growth within specified warranty period.

1. Failures include, but are not limited to, the following:
a. Death and unsatisfactory growth, except for defects resulting from lack of adequate maintenance, neglect, abuse by Owner, or incidents that are beyond Contractor's control. b. Structural failures including plantings falling or blowing over.

2. Warranty Periods from Date of Substantial Completion:
a. Trees and Shrubs: One year.
b. Ground Cover and Plants: Six months.

B. Correct Species: Warrant that all plant materials are true to species and variety.

C. Delays: Delays caused by the Contractor in completing planting operations which extend the planting into more than one planting season shall extend the Warranty Period correspondingly.

D. Condition of Plants: Plants shall be free of dead or dying branches and branch tips, with foliage of normal density, size and color.

E. Replacements: As soon as weather conditions permit, replace, without cost to Owner all dead plants and all plants not in a vigorous, thriving condition, as determined by Architect during and at the end of Warranty Period.

F. Exclusions: Contractor shall not be held responsible for failures due to neglect by Owner, vandalism, and natural disaster, during Warranty Period. Report such conditions. a.

3. 1.

Page 178 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
142

MAINTENANCE SERVICE
A. Initial Maintenance Service: Provide full maintenance by skilled employees of landscape Installer. Maintain as required in Part 3. Begin maintenance immediately after each area is planted and continue until plantings are acceptably healthy and well established, but for not less than maintenance period below.

1. Maintenance Period for Trees and Shrubs: 6 months from date of Substantial Completion.

B. REPLACEMENTS

1. Failed Materials:
a. Repair and/or replace at no cost to the Owner all plant materials exhibiting conditions which are determined as unacceptable due to workmanship by the Contractor. b. Closely match replacements to adjacent specimens of the same species. Apply requirements of this Specification to replacements.
c. Contractor shall be held responsible for a maximum of two (2) replacements for each failed tree, shrub and vine, and same area of groundcover planting after final acceptance during warranty period.

C. Incorrect Materials:

1. During Warranty Period, replace at no cost to Owner plants revealed as being untrue to name and species.

2. Provide replacements of a size and quality to match the planted materials at the time the mistake is discovered.

1. PART 2 - PRODUCTS

GENERAL
A. Immediately upon award of Contract for Work in this Section, the Contractor shall locate and purchase or hold for purchase all plant material as required.

B. Contractor shall verify with Owner’s Authorized Representative of any plant material stock that has been nursery contract grown by Owner for use within Work of this Contract.

1. Contractor shall review the condition of the plant material with the Owner’s Authorized Representative at the nursery maintaining the plant material, and at the time of delivery at the Project Site.

C. All plants shall have a growth habit typical for variety and species, symmetrical, with tightly knit branching, so trained or favored in development and appearance as to be superior in form, number of branches, compactness and symmetry, healthy, vigorous in growth. Plant materials shall also be free from insect pests, eggs and larvae, plant diseases, sun scalds, fresh bark abrasions, excessive abrasions, windburn, saltburn, or other objectable disfigurements or conditions as determined by the Owner’s Authorized Representative.

Page 179 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
143

1. Container stock shall be grown in containers in which delivered for at least six (6) months, but not over two (2) years.

2. Trees shall be exceptionally heavy, symmetrical, tightly knit, and so trained or favored in development and appearance as to be superior in form for their species, with regard to number of branches, compactness and symmetry.

3. Pruning of trees as grown at the nursery shall meet the requirements outlined by the International Society of Arboriculture’s “Tree Pruning Standards.”

4. Leaders of trees shall not have been pruned by the nursery.

D. All plant material shall be subject per the California State Department of Agriculture Regulations for Nursery Inspections of Rules and Grading. Quantity and size of all plant shall be No. 1 Grade of Pinto Tag stock, or equal.

Pinto tags shall be submitted to the Owner’s Authorized Representative upon delivery of the plant material to the Project Site.

E. Vigor: Plants shall be sound, healthy and vigorous, well branched and densely foliated when in leaf. They shall be free of disease, insect pests, eggs, or larvae. They shall have healthy, well- developed root systems. Plants shall be free from physical damage or adverse conditions which would prevent thriving growth.

F. Condition of Root System: Samples must prove to be completely free of circling, kinked or girdling trunk surface and center roots and show no evidence of a pot-bound condition. Upon inspection by Architect at the job site, if five (5) percent or more of the plants of each species are found to contain kinked, circling or girdling roots, all plants of that species will be rejected.

G. MEASUREMENTS:

1. Size Range: If a range of size is given, do not use plant materials less than the minimum size. The measurements specified are the minimum size acceptable and are the measurements after pruning, where pruning is required. Plants that meet the measurements specified, but do not possess a normal balance between height and spread shall be rejected.

2. Substitutions: Substituted plants shall be true to species and variety and shall conform to measurements specified except that plants larger than specified may be used if accepted. Use of such plants shall not increase Contract price. If larger plants are accepted, increase the ball of earth in proportion to the size of the plant. Plants overgrown for their container size will be rejected.

3. Unacceptable Trees: Trees that have damaged or crooked leaders, will be rejected. Trees having a main leader shall not have been headed back. Trees with abrasions of the bark, sunscalds, disfiguring knots, or fresh cuts of limbs over 3/4 in. which have not completely callused, will be rejected.

4. Pruning: Do not prune plants before delivery. Consult Landscape Architect for pruning after installation.

5. Field Dug Stock: Prior to digging of field grown plant materials, insure that excess loose fill resulting from cultivation around stems and over roots be removed down to natural finish grade at crown of plant materials. During digging, verify that size of tree spade or other equipment is adequate to encompass the

Page 180 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
144
actively growing root zone of all plants. Plants which, after digging, show mostly large fleshy roots and few fibrous roots will be rejected.

A.

TREE AND SHRUB MATERIAL
A. General: Furnish nursery-grown trees and shrubs complying with ANSI Z60.1, with healthy root systems developed by transplanting or root pruning. Provide well-shaped, fully branched, healthy, vigorous stock free of disease, insects, eggs, larvae, and defects such as knots, sun scald, injuries, abrasions, and disfigurement.

B. Root-Ball Depth: Furnish trees and shrubs with root balls measured from top of root ball, which shall begin at root flare according to ANSI Z60.1.Root flare shall be visible before planting.

C. Shrub sizes indicated on Drawings are sizes after pruning.

GROUND COVER PLANTS
A. Ground Cover: Provide ground cover of species indicated, established and well rooted in pots or similar containers, and complying with ANSI Z60.1.

B. Dichondra: Provide dichondra seed with a minimum of 99 percent pure seed, not less than 85 percent germination, and not more than 0.25 percent weed seed.

C. Dichondra: Provide dichondra plants grown in flats and suitable for cutting into plugs.

TOPSOIL
A. Topsoil: ASTM D 5268, pH range of 5.5 to 7, a minimum of 4 percent organic material content; free of stones 1 inch larger in any dimension and other extraneous materials harmful to plant growth.

1. Topsoil Source: Reuse surface soil stockpiled on-site. Verify suitability of stockpiled surface soil to produce topsoil. Clean surface soil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful to plant growth.
a. Supplement with imported or manufactured topsoil from off-site sources when quantities are insufficient.

2. Topsoil Source: Import topsoil or manufactured topsoil from off-site sources. Obtain topsoil displaced from naturally well-drained construction or mining sites where topsoil occurs at least 4 inches deep; do not obtain from bogs or marshes.

3. Topsoil Source: Amend existing in-place surface soil to produce topsoil. Verify suitability of surface soil to produce topsoil. Clean surface soil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful to plant growth.

Page 181 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
145
a. Surface soil may be supplemented with imported or manufactured topsoil from offsite sources

ORGANIC SOIL AMENDMENTS
A. Compost: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 3/4-inch sieve; soluble salt content of 5 to 10 decisiemens/m. not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows: 1. Organic Matter Content: 50 to 60 percent of dry weight B. Peat: Finely divided or granular texture, with a pH range of 6 to 7.5, containing partially decomposed moss peat, native peat, or reed-sedge peat and having a water-absorbing capacity of 1100 to 2000 percent.

C. Wood Derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture, free of chips, stones, sticks, soil, or toxic materials.

D. Manure: Well-rotted, unleached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth.

FERTILIZER
A. Composition: Nitrogen (N), phosphorous (P), and potassium (K) content.

B. Fertilizer shall be furnished in amounts recommended from the soil analysis, as reported from a qualified soiltesting agency. Refer to Section 3.3.

C. Bonemeal: Commercial, raw, finely ground; minimum of 4 percent nitrogen and 20 percent phosphoric acid.

D. Plant Fertilizer (pre-plant 12-8-8)

1. Shall be a long-lasting, controlled-release, uniform in composition, free flowing, granular type fertilizer, with trace minerals, suitable for application with approved equipment.

2. Plant fertilizer shall contain the following minimum available percentages by weight of plant food (pending results of soil analysis):
i. Nitrogen 12.0% minimum
ii. Phosphoric acid 8.0% minimum
iii. Potash 8.0% minimum
iv. Humus 25% minimum
v. Humic Acids w/ Trace minerals 5% minimum
E. Fertilizer or Planting Tablet:

Page 182 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
146

1. 1. Provide 7-gram Plant Tablet. Tablet shall be tightly compressed chip-type commercial grade, 12-month slow-release planting tablets, and shall be composed of the following available percentages by weight of plant food (pending results of soil analysis):
a. Nitrogen 12.0% minimum
b. Phosphoric acid 8.0% minimum
c. Potash 8.0% minimum
d. Humus 20% minimum
e. Humic Acids w/ micronutrients
f. and soil enhancers 4% minimum

1. 2. Acceptable Manufacturer: Gro-Power or equal, (no known equal) as approved by the City.

MULCHES
A. Organic Bark Mulch: Organic mulch, free from deleterious materials, debris, and weed seed. Suitable as a top dressing of trees, shrubs and groundcovers, consisting of following:

1. Type: Shredded cedar and/or redwood commercial wood bark products. Bark mulch shall be graded to average dimensions of one-half inches (1/2") to two inches (2") in length, and flat in cross section.

2. Coverage depth shall be a minimum of three inches (3"), or as indicated on the Contract Drawings.

3. Acceptable Products & Manufacturers:

4. Walk-on Fir Bark Mulch as manufactured by Redi-Gro Corporation, Sacramento, CA. 916.381.6063.

5. Or approved equal.

B. Gravel Mulch: 3/8" - 1/2" crushed Sierra white granite, free of loam, sand, clay, and other foreign substances.

WEED-CONTROL BARRIERS
A. Type: Permeable weed barrier fabric, “Style 0040” by Amoco Fabrics and Fibers Company, or “Typar” by Reemay, or equal as approved by the City

PLANTING SOIL MIX
A. Topsoil: ASTM D 5268, pH range of 5.5 to 7, 4 percent organic material minimum, free of stones one inch (1") or larger in any dimension, and other extraneous materials harmful to plant growth.

Page 183 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
147

1. Topsoil Source: Reuse surface soil stockpiled on the site. Verify suitability of surface soil to produce topsoil meeting requirements and amend when necessary. Supplement with imported topsoil when quantities are insufficient. Clean topsoil of roots, plants, sods, stones, clay lumps, and other extraneous materials harmful to plant growth.

2. Topsoil Source: Amend existing surface soil to produce topsoil. Supplement with imported topsoil when required.

Tree Stake and Guys
A. Tree Staking:

1. Stakes: Lodgepole Pine with 10 in. tapered driving point and chamfered top, green color, treated with copper napthanate to heartwood.

2. Ties: Black rubber tire tie or other tie as accepted by Owner’s representative.

B. Tree Guying:

1. Deadman Type: Redwood or cedar with minimum length of 24 in. and sufficient diameter to hold eyebolt securely. Provide each deadman with one (1) 3/4 in. x 4 in. galvanized eyebolt, centered and secured on its side.

2. Guying Cable: White vinyl-coated 7 x 7 galvanized steel cable, size as specified.

3. Tree Collars: 500 I.D. x 12" UV resistant flexible tubing.

4. Turnbuckles: Eye to eye type, zinc plated, size as specified.

5. Cable Clamps: Zinc plated, U-bolt and Clevis type, size as required.

PART 3 - EXECUTION
Verification of Conditions:

A. Verify installation conditions as satisfactory to receive work of this Section. Do not install until unsatisfactory conditions are corrected. Beginning work constitutes acceptance of conditions as satisfactory B. Finish Grades: Finish grades for planting areas shall have been established in another Section. Verify that all grades are within 1 in. plus or minus of required finish grade.

C. Soil Preparation: Do not commence planting work prior to completion and acceptance of soil preparation.

D. Irrigation: Verify that irrigation system has been installed and accepted.

E. Subdrainage: Verify that all subdrainage systems are functioning properly prior to planting.

Page 184 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
148

PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities, and lawns and existing exterior plants from damage caused by planting operations.

B. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

C. Lay out individual tree and shrub locations and areas for multiple plantings. Stake locations, outline areas, adjust locations when requested, and obtain Architect's acceptance of layout before planting. Make minor adjustments as required.

D. Apply antidesiccant to trees and shrubs using power spray to provide an adequate film over trunks (before wrapping), branches, stems, twigs, and foliage to protect during digging, handling, and transportation.

1. If deciduous trees or shrubs are moved in full leaf, spray with antidesiccant at nursery before moving and again two weeks after planting

PLANTING BED ESTABLISHMENT
A. Loosen subgrade of planting beds to a minimum depth of 6 inches. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Thoroughly blend planting soil mix off-site before spreading. a. Delay mixing fertilizer with planting soil if planting will not proceed within a few days. b. Mix lime with dry soil before mixing fertilizer.

2. Spread planting soil mix to a depth of 8 inches but not less than required to meet finish grades after natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet. a. Spread approximately 1/2 the thickness of planting soil mix over loosened subgrade. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil mix.

B. Finish Grading: Grade planting beds to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

C. Before planting, restore planting beds if eroded or otherwise disturbed after finish grading.

WEED ABATMENT
A. Irrigate the prepared site for a period of three weeks to encourage weed growth. After that time, treat and remove all weeds with vinegar and hand tools. If after 1 week further, weeds persist, treat with Round-Up per manufacturers recommendation.

Page 185 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
149

HEADERS
A. Lay out locations of headers for review prior to final installation. Install per details in Drawings true to line and grade.

TREES AND SHRUBS
A. Excavation of Pits and Trenches: Excavate circular pits with sides sloped inward. Trim base leaving center area raised slightly to support root ball and assist in drainage. Do not further disturb base. Scarify sides of plant pit smeared or smoothed during excavation.

1. Excavate approximately three times as wide as ball diameter.

2. Container-Grown Trees and Shrubs: Excavate to three times (3x) the container width and depth, plus the following setting-layer depth, or as further directed by the Owner.

B. Before planting, verify that root flare is visible at top of root ball according to ANSI Z60.1.

C. Stock with Root Balls: Set trees and shrubs plumb and in center of pit or trench with top of root ball flush with adjacent finish grades.

D. Balled and Burlapped: Remove burlap and wire baskets from tops of root balls and partially from sides, but do not remove from under root balls. Remove pallets, if any, before setting. Do not use planting stock if root ball is cracked or broken before or during planting operation.

E. Container Grown: Carefully remove root ball from container without damaging root ball or plant.

F. Fabric Bag Grown: Carefully remove root ball from fabric bag without damaging root ball or plant. Do not use planting stock if root ball is cracked or broken before or during planting operation.

G. Backfill around root ball in layers, tamping to settle soil and eliminate voids and air pockets. When planting pit is approximately one-half filled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed.

1. Use planting soil for backfill as permitted by Agricultural Soils Test.

H. Place planting soil mix around root ball in layers, tamping to settle mix and eliminate voids and air pockets.

When pit is approximately one-half backfilled, water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed. Water again after placing and tamping final layer of planting soil mix.

I. Continue backfilling process. Water again after placing and tamping final layer of soil.

TREE AND SHRUB PRUNING
A. Remove only dead, dying, or broken branches. Do not prune for shape.

Page 186 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
150
B. Prune, thin, and shape trees and shrubs according to standard horticultural practice. Prune trees to retain required height and spread. Do not cut tree leaders; remove only injured or dead branches from flowering trees.

Prune shrubs to retain natural character.

GROUND COVER AND PLANT PLANTING
A. Set out and space ground cover and plants 12 inches.

B. Dig holes large enough to allow spreading of roots and backfill with planting soil.

C. Work soil around roots to eliminate air pockets and leave a slight saucer indentation around plants to hold water.

D. Water thoroughly after planting, taking care not to cover plant crowns with wet soil.

E. Protect plants from hot sun and wind; remove protection if plants show evidence of recovery from transplanting shock.

PLANTING BED MULCHING
A. Install weed-control barriers before mulching according to manufacturer's written instructions. Completely cover area to be mulched, overlapping edges a minimum of 6 inches. Tape or pin seams as recommended by manufacturer.

B. Mulch backfilled surfaces of planting beds and other areas indicated. Provide mulch ring around trees in lawn areas.

1. [Organic Mulch] [and] [Mineral Mulch]: Apply 3-inch (75-mm) average thickness of mulch, and finish level with adjacent finish grades. Do not place mulch against plant stems.

PLANT MAINTENANCE
A. Tree and Shrub Maintenance: Maintain plantings by pruning, cultivating, watering, weeding, fertilizing, restoring planting saucers, and resetting to proper grades or vertical position, as required to establish healthy, viable plantings. Spray or treat as required to keep trees and shrubs free of insects and disease.

B. Ground Cover and Plant Maintenance: Maintain and establish plantings by watering, weeding, fertilizing, mulching, and other operations as required to establish healthy, viable plantings.

C. Protect exterior plants from damage due to landscape operations, operations by other contractors and trades, and others. Maintain protection during installation and maintenance periods. Treat, repair, or replace damaged plantings.

8.12. Turf and Grasses

Page 187 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
151
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Turf and Grasses” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #17 Turf Restoration SF

GENERAL

SUMMARY
A. Section Includes:

1. Seeding.

2. Sodding.

B. Related Documents:

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions. b. The Drawings.
c. Division 01 Specification Sections and related requirements in other sections of the Project Manual.

Including but not limited;
I. Section 320190 Landscape Maintenance
II. Section 329119 Landscape Grading
III. Section 329300 Planting
d. Related requirements in other Contract Documents listed in the Agreement.

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

REFERENCES
A. General:

1. The following documents form part of the Specifications to the extent stated. Bring conflicts between Specifications, Drawings, and the referenced documents to the attention of the Architect, in writing, for resolution before taking any related action. Where differences exist between codes and standards, the one affording the greatest protection shall apply.

Page 188 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
152

2. If the year of the adoption or latest revision is omitted from the designation, it shall mean the specification, manual or test designation in effect the date the Notice to Proceed with the Work is given.

DEFINITIONS
A. Finish Grade: Elevation of finished surface of planting soil.

B. Manufactured Soil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

C. Planting Soil: Native or imported topsoil, manufactured topsoil, or surface soil modified to become topsoil; mixed with soil amendments.

D. Subgrade: Surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill immediately beneath planting soil.

E. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms.

1. SUBMITTALS
A. Product Data: For each type of product indicated.

B. Certification of Grass Seed: From seed vendor for each grass-seed monostand or mixture stating the botanical and common name and percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging.

1. Certification of each seed mixture for turfgrass sod, identifying source, including name and telephone number of supplie.

C. Product certificates: For soil amendments and fertilizers, signed by product manufacturer D. Planting Schedule: Indicating anticipated planting dates for each type of planting.

E. Maintenance Instructions: Recommended procedures to be established by Owner for maintenance of lawns during a calendar year. Submit before expiration of required maintenance periods.

QUALITY ASSURANCE
A. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when planting is in progress.

Page 189 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
153
B. Soil-Testing Laboratory Qualifications: An independent laboratory, recognized by the State Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed
C. Topsoil Analysis: Furnish soil analysis by a qualified soil-testing laboratory.

1. Report suitability of topsoil for lawn growth. State-recommended quantities of nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory topsoil.

DELIVERY, STORAGE, AND HANDLING
A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indicationof compliance with state and Federal laws, as applicable
B. Sod: Harvest, deliver, store, and handle sod according to requirements in TPI's "Specifications for Turfgrass Sod Materials" and "Specifications for Turfgrass Sod Transplanting and Installation" in its "Guideline Specifications to Turfgrass Sodding." Deliver sod in time for planting within 24 hours of harvesting. Protect sod from breakage and drying.

SCHEDULING
A. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit.

MAINTENANCE SERVICE
A. See Division 32 "Landscape Maintenance"
B. Begin maintenance immediately after each area is planted and continue until acceptable lawn is established, but for not less than the following periods:

1. Sodded Lawns: 90 days from date of Substantial Completion.

C. Maintain and establish lawn by watering, fertilizing, weeding, mowing, trimming, replanting, and other operations. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth lawn.

1. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch. Anchor as required to prevent displacement.

D. Watering: Provide and maintain temporary piping, hoses, and lawn-watering equipment to convey water from sources and to keep lawn uniformly moist to a depth of 4 inches (100 mm).

1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas.

2. Water lawn at a minimum rate of 1 inch (25 mm) per week.

Page 190 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
154
E. Mow lawn as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 40 percent of grass height. Remove no more than 40 percent of grass-leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. Schedule initial and subsequent mowings to maintain the following grass height:

1. Mow grass 1/2 to 1 inch (13 to 25 mm) high.

F. Lawn Postfertilization: Apply fertilizer after initial mowing and when grass is dry.

1. Use fertilizer that will provide actual nitrogen of at least 1 lb/1000 sq. ft. (0.45 kg/92.9 sq. m) to lawn area.

PART 2 - PRODUCTS

MANUFACTURERS
A. Acceptable Manufacturers:

1. Products described below and identified by product name, model number, or other manufacturer designation, are basis of design products. Basis of design products establish the standards of type, function, dimension, in-service performance, physical properties, appearance, warranty, cost, and other characteristics required by the Project.
a. Pacific Coast Sod Patterson, CA 95352 Tel: (800) 692-8690 a. Or equal

1. Subject to the requirements of Division 01 "Product Requirements", products of manufacturers not listed may be proposed for substitution, provided they are comparable to the products specified. a. If "No substitutions" is indicated next to the product name, provide only products of listed manufacturers.
b. The burden of proof of equality of proposed products is on the Contractor.

SEED
A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Journal of Seed Technology; Rules for Testing Seeds" for purity and germination tolerances.

B. Seed Species: State-certified seed of grass species, as follows:

1. Quality: State-certified seed of grass species as listed below for solar exposure.

2. Quality: Seed of grass species as listed below for solar exposure, with not less than 85

3. percent germination, not less than 95 percent pure seed, and not more than 0.5 percent

4. weed seed:

Page 191 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
155

5. Sun and Partial Shade: Proportioned by weight as follows, or approved equal:
a. 50 percent Kentucky Bluegrass.
b. 33 percent Creeping Red Fescue.
c. 17 percent Kokamo Perennial Ryegrass
SOD
A. Product:

1. Medallion Dwarf with Bonsai Thickness: 5/8" - 3/4" Sizes: 10" x 72"

2. Or equal
A.

ORGANIC SOIL AMENDMENTS
A. Compost: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 1-inch (25-mm) sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:

1. Organic Matter Content: 50 to 60 percent of dry weight.

2. Feedstock: Agricultural, food, or industrial residuals; biosolids; yard trimmings; or source- separated or compostable mixed solid waste.

B. Wood Derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture, free of chips, stones, sticks, soil, or toxic materials.

1. In lieu of decomposed wood derivatives, mix partially decomposed wood derivatives with at least 0.15 lb (2.4 kg) of ammonium nitrate or 0.25 lb (4 kg) of ammonium sulfate per cubic foot (cubic meter) of loose sawdust or ground bark.

C. Manure: Well-rotted, unleached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth.

A.

FERTILIZER
A. Bonemeal: Commercial, raw or steamed, finely ground; a minimum of 4 percent nitrogen and 10 percent phosphoric acid.

Page 192 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
156
B. Superphosphate: Commercial, phosphate mixture, soluble; a minimum of 20 percent available phosphoric acid.

C. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slowrelease nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

1. Composition: 1 lb/1000 sq. ft. (0.45 kg/92.9 sq. m) of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.

2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency.

D. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.

2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil-testing agency.

MULCHES
A. Compost Mulch: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 1-inch (25-mm) sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:

1. Organic Matter Content: 50 to 60 percent of dry weight.

2. Feedstock: Agricultural, food, or industrial residuals; biosolids; yard trimmings; or source- separated or compostable mixed solid waste.

B. Fiber Mulch: Biodegradable, dyed-wood, cellulose-fiber mulch; nontoxic; free of plant-growth or germination inhibitors; with maximum moisture content of 15 percent and a pH range of 4.5 to 6.5.

PLANTING ACCESSORIES
A. Selective Herbicides: EPA registered and approved, of type recommended by manufacturer for application.

PART 3 - EXECUTION

EXAMINATION
A. Examine areas to receive lawns for compliance with requirements and other conditions affecting performance.

Proceed with installation only after unsatisfactory conditions have been corrected.

Page 193 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
157

PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings from damage caused by planting operations.

B. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

LAWN PREPARATION
A. Limit lawn subgrade preparation to areas to be planted.

B. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 6 inches (150 mm). Remove stones larger than 1 inch (25 mm) in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Apply superphosphate fertilizer directly to subgrade before loosening.

2. Thoroughly blend planting soil mix off-site before spreading or spread topsoil, apply soil amendments and fertilizer on surface, and thoroughly blend planting soil mix. a. Delay mixing fertilizer with planting soil if planting will not proceed within a few days. b. Mix lime with dry soil before mixing fertilizer.

3. Spread planting soil mix to a depth of 6 inches (150 mm) but not less than required to meet finish grades after light rolling and natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet.
a. Spread approximately one-half the thickness of planting soil mix over loosened subgrade. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil mix. b. Reduce elevation of planting soil to allow for soil thickness of sod.

C. Unchanged Subgrades: If lawns are to be planted in areas unaltered or undisturbed by excavating, grading, or surface soil stripping operations, prepare surface soil as follows:

1. Remove existing grass, vegetation, and turf. Do not mix into surface soil.

2. Loosen surface soil to a depth of at least of 8 inches (200 mm). Apply soil amendments and fertilizers according to planting soil mix proportions and mix thoroughly into top 6 inches of soil. Till soil to a homogeneous mixture of fine texture.

3. Apply superphosphate fertilizer directly to surface soil before loosening.

4. Remove stones larger than 1 inch (25 mm) in any dimension and sticks, roots, trash, and other extraneous matter.

5. Legally dispose of waste material, including grass, vegetation, and turf, off Owner's property.

Page 194 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
158
D. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture.

Grade to within plus or minus 1/2 inch (13 mm) of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit fine grading to areas that can be planted in the immediate future.

E. Moisten prepared lawn areas before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

F. Restore areas if eroded or otherwise disturbed after finish grading and before planting.

A.

SEEDING
A. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph.

1. 1. Evenly distribute seed by sowing equal quantities in two directions at right angles to each

2. other.

3. 2. Do not use wet seed or seed that is moldy or otherwise damaged.

4. 3. Do not seed against existing trees. Limit extent of seed to outside edge of plantingsaucer.

B. Sow seed at a total rate of 25 lb/1000 sq. ft.

C. Rake seed lightly into top 1/8 inch of soil, roll lightly, and water with fine spray.

D. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose thickness over seeded areas.

1. Anchor straw mulch by crimping into soil with suitable mechanical equipment.

E. Protect seeded areas from hot, dry weather or drying winds by applying compost mulch, peat mulch and planting soil within 24 hours after completing seeding operations. Soak areas, scatter mulch uniformly to a thickness of 3/16 inch, and roll surface smooth.

F. Do not broadcast or drop seed when wind velocity exceeds 5 mph (8 km/h). Evenly distribute seed by sowing equal quantities in two directions at right angles to each other.

SODDING
A. Lay sod within 24 hours of harvesting. Do not lay sod if dormant or if ground is frozen or muddy.

B. Lay sod to form a solid mass with tightly fitted joints. Butt ends and sides of sod; do not stretch or overlap.

Stagger sod strips or pads to offset joints in adjacent courses. Avoid damage to subgrade or sod during installation. Tamp and roll lightly to ensure contact with subgrade, eliminate air pockets, and form a smooth surface. Work sifted soil or fine sand into minor cracks between pieces of sod; remove excess to avoid smothering sod and adjacent grass.

Page 195 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
159
C. Saturate sod with fine water spray within two hours of planting. During first week after planting, water daily or more frequently as necessary to maintain moist soil to a minimum depth of 1-1/2 inches below sod.

1. CLEANUP AND PROTECTION
A. Promptly remove soil and debris created by lawn work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.

B. Erect barricades and warning signs as required to protect newly planted areas from traffic. Maintain barricades throughout maintenance period and remove after lawn is established.

C. Remove erosion-control measures after grass establishment period.

LAWN MAINTENANCE
A. Maintain and establish lawn by watering, fertilizing, weeding, mowing, trimming, replanting, and other operations. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth lawn.

Provide materials and installation the same as those used in the original installation.

B. Mow lawn as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 1/3 of grass height. Remove no more than 1/3 of grass-leaf growth in initial or subsequent mowings.

8.13. Subdrainage
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Subdrainage” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #18 Area Drains LS
PART 1 - GENERAL

SUMMARY
A. This Section includes subdrainage systems for the following:

1. Underslab areas.

2. Landscaped areas.

3.

Page 196 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
160
B. Related Documents

1. The following applies to this section:
a. General provisions of the Contract, including General and Supplementary Conditions. b. The Drawings.
c. Division 01 Specification Sections and related requirements in other sections of the Project Manual.

Including but not limited;
I. Section 311000 Site Clearing
II. Section 311000 Earth Moving
III. Section 321313 Concrete Paving
IV. Section 321416 Brik Unit Paving
V. Section 329119 Landscape Grading
VI. Section 329300 Planting
d. Related requirements in other Contract Documents listed in the Agreement.

2. Review these documents for coordination with additional requirements and information that apply to work under this Section

REFERENCE
A. General:

1. The following documents form part of the Specifications to the extent stated. Bring conflicts between Specifications, Drawings, and the referenced documents to the attention of the Architect, in writing, for resolution before taking any related action. Where differences exist between codes and standards, the one affording the greatest protection shall apply.

2. If the year of the adoption or latest revision is omitted from the designation, it shall mean the specification, manual or test designation in effect the date the Notice to Proceed with the Work is given.

3. Standard Specifications - Standard Specifications of the State of California, Business and Transportation Agency, Department of Transportation, CALTRANS.

4. ASTM - American Society for Testing and Materials

5. Town of Los Gatos Specifications and Details and Applicable Regulations.

6. Other applicable federal, state, and local regulations.

DEFINITIONS

Page 197 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
161
A. ABS: Acrylonitrile-butadiene-styrene plastic.

B. HDPE: High-density polyethylene plastic.

C. PE: Polyethylene plastic.

D. PP: Polypropylene plastic.

E. PS: Polystyrene plastic.

F. PVC: Polyvinyl chloride plastic.

G. Subdrainage: Drainage system that collects and removes subsurface or seepage water.

SUBMITTALS
A. Product Data: For each type of drainage panel indicated.

PROJECT/SITE CONDITIONS
A. Existing Conditions: For protection of existing plants to remain, see Division 31, Section "Selective Tree Protection and Trimming".

B. Protection of Utilities:

1. Provide temporary support and protection of underground and surface utility structures, drains, services and other improvements to remain.

2. Where grade or alignment of pipe is obstructed by existing utility structures such as conduits, ducts or pipes, permanently support, relocate, remove or reconstruct the obstruction.

3. Restore all damaged improvements to original condition at no additional cost to Owner.

DELIVERY, STORAGE, AND HANDLING
A. Delivery: All containerized products shall be delivered to the site in manufacturer's original, unopened, legibly labeled containers. All pipe to be delivered bound securely to prevent damage. Supply pallets as required to protect products.

B. Storage: Protect materials from damage, water and rust. Store pipes on beds which are full length of pipe.

Protect plastic materials from direct sunlight.

C. Pipe: Cap openings to prevent entry of dust, debris and other foreign matter.

SEQUENCING AND SCHEDULING

Page 198 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
162
A. Concealed Work: Verify and locate existing pipes and structures to be coordinated with landscape drainage work.

B. Lines and Levels: Establish for each drainage system and coordinate with other systems to prevent conflicts and maintain proper clearances.

C. Notification: Submit written notification of all discrepancies in the Drawings or existing conditions which preclude successful installation of landscape drainage work as specified.

1. PART 2 - PRODUCTS

PERFORATED-WALL PIPES AND FITTINGS
A. Perforated PE Pipe and Fittings: ASTM F 405 or AASHTO M 252, Type CP; corrugated, for coupled joints.

B. Perforated PVC Sewer Pipe and Fittings: ASTM D 2729, bell-and-spigot ends, for loose joints

SOLID-WALL PIPES AND FITTINGS
A. Cast-Iron Soil Pipe and Fittings: ASTM A 74, Service and Extra-Heavy classes, hub-and-spigot ends, gray, for gasketed joints.

1. Gaskets: ASTM C 564, rubber, of thickness matching class of pipe.

B. PE Drainage Tubing and Fittings: AASHTO M 252, Type S, corrugated, with smooth waterway, for coupled joints.

1. Couplings: AASHTO M 252, corrugated, band type, matching tubing and fittings.

C. PVC Sewer Pipe and Fittings: ASTM D 3034, SDR 35, bell-and-spigot ends, for gasketed joints.

1. Gaskets: ASTM F 477, elastomeric seal.

CLEANOUTS
A. Cast-Iron Cleanouts: ASME A112.36.2M; with round-flanged, cast-iron housing; and secured, scoriated, MediumDuty Loading class, cast-iron cover. Include cast-iron ferrule and countersunk, brass cleanout plug.

B. PVC Cleanouts: ASTM D 3034, PVC cleanout threaded plug and threaded pipe hub.

SOIL MATERIALS
A. Backfill, drainage course, impervious fill, and satisfactory soil materials are specified in Division 31 Section "Earth Moving."

Page 199 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
163

GEOTEXTILE FILTER FABRICS
A. Description: Fabric of PP or polyester fibers or combination of both, with flow rate range from 110 to 330 gpm/sq. ft. when tested according to ASTM D 4491.

1. Structure Type: Nonwoven, needle-punched continuous filament

2. Style(s): Flat and sock
PART 3 - EXECUTION

EARTHWORK
A. Excavating, trenching, and backfilling are specified in Division 31 Section "Earth Moving."

PIPING APPLICATIONS
A. Underground Subdrainage Piping:

1. Perforated PE pipe and fittings, couplings, and coupled joints.

2. Perforated PVC sewer pipe and fittings for loose, bell-and-spigot joints.

B. Underslab Subdrainage Piping:

1. Perforated PE pipe and fittings, couplings, and coupled joints.

2. Perforated PVC sewer pipe and fittings and loose, bell-and-spigot joints.

3.3 CLEANOUT APPLICATIONS
A. In Underground Subdrainage Piping:

1. At Grade in Earth: Cast-iron or PVC cleanouts.

2. At Grade in Paved Areas: Cast-iron cleanouts.

B. In Underslab Subdrainage Piping:

1. In Equipment Rooms and Unfinished Areas: Cast-iron cleanouts.

2. In Finished Areas: Copper-alloy cleanouts.

FOUNDATION DRAINAGE INSTALLATION
A. Place impervious fill material on subgrade adjacent to bottom of footing after concrete footing forms have been removed. Place and compact impervious fill to dimensions indicated, but not less than 6 inches deep and 12 inches wide.

Page 200 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
164
B. Lay flat-style geotextile filter fabric in trench and overlap trench sides.

C. Place supporting layer of drainage course over compacted subgrade and geotextile filter fabric, to compacted depth of not less than 4 inches.

D. Encase pipe with sock-style geotextile filter fabric before installing pipe. Connect sock sections with adhesive or tape.

E. Install drainage piping as indicated in Part 3 "Piping Installation" Article for foundation subdrainage.

F. Add drainage course to width of at least 6 inches on side away from wall and to top of pipe to perform tests.

G. After satisfactory testing, cover drainage piping to width of at least 6 inches on side away from footing and above top of pipe to within 12 inches of finish grade.

H. Install drainage course and wrap top of drainage course with flat-style geotextile filter fabric.

I. Place layer of flat-style geotextile filter fabric or waterproofing felt over top of drainage course, overlapping edges at least 4 inches
J. Place initial backfill material over compacted drainage course. Place material in loose-depth layers not exceeding 6 inches. Thoroughly compact each layer. Final backfill to finish elevations and slope away from building.

1. UNDERSLAB DRAINAGE INSTALLATION
A. Excavate for underslab drainage system after subgrade material has been compacted but before drainage course has been placed. Include horizontal distance of at least 6 inches between drainage pipe and trench walls.

Grade bottom of trench excavations to required slope, and compact to firm, solid bed for drainage system.

B. Lay flat-style geotextile filter fabric in trench and overlap trench sides.

C. Place supporting layer of drainage course over compacted subgrade and geotextile filter fabric, to compacted depth of not less than 4 inches .

D. Encase pipe with sock-style geotextile filter fabric before installing pipe. Connect sock sections with adhesive or tape.

E. Install drainage piping as indicated in Part 3 "Piping Installation" Article for underslab subdrainage.

F. Add drainage course to width of at least 6 inches on side away from wall and to top of pipe to perform tests.

G. After satisfactory testing, cover drainage piping with drainage course to elevation of bottom of slab, and compact and wrap top of drainage course with flat-style geotextile filter fabric.

PIPING INSTALLATION

Page 201 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
165
A. Install piping beginning at low points of system, true to grades and alignment indicated, with unbroken continuity of invert. Bed piping with full bearing in filtering material. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions and other requirements indicated.

1. Foundation Subdrainage: Install piping pitched down in direction of flow, at a minimum slope of 0.5 percent and with a minimum cover of 36 inches, unless otherwise indicated.

2. Underslab Subdrainage: Install piping pitched down in direction of flow, at a minimum slope of 0.5 percent.

3. Lay perforated pipe with perforations down.

4. Excavate recesses in trench bottom for bell ends of pipe. Lay pipe with bells facing upslope and with spigot end entered fully into adjacent bell.

B. Use increasers, reducers, and couplings made for different sizes or materials of pipes and fittings being connected. Reduction of pipe size in direction of flow is prohibited.

C. Install PE piping according to ASTM D 2321.

D. Install PVC piping according to ASTM D 2321.

PIPE JOINT CONSTRUCTION
A. Cast-Iron Soil Pipe and Fittings: Hub and spigot, with rubber compression gaskets according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook." Use gaskets that match class of pipe and fittings.

B. Join PE pipe, tubing, and fittings with couplings for soil-tight joints according to AASHTO's "Standard Specifications for Highway Bridges," Division II, Section 26.4.2.4, "Joint Properties." C. Join perforated, PE pipe and fittings with couplings for soil-tight joints according to AASHTO's "Standard Specifications for Highway Bridges," Division II, Section 26.4.2.4, "Joint Properties"; or according to ASTM D 2321.

D. Join PVC pipe and fittings according to ASTM D 3034 with elastomeric seal gaskets according to ASTM D 2321.

E. Join perforated PVC pipe and fittings according to ASTM D 2729, with loose bell-and-spigot joints.

F. Special Pipe Couplings: Join piping made of different materials and dimensions with special couplings made for this application. Use couplings that are compatible with and fit materials and dimensions of both pipes

CLEANOUT INSTALLATION
A. Cleanouts for Foundation Subdrainage:

1. Install cleanouts from piping to grade. Locate cleanouts at beginning of piping run and at changes in direction. Install fittings so cleanouts open in direction of flow in piping.

Page 202 ends

ITEM NO. 7.
undefined #21-831-4007
Title: Oak Meadow Bandstand Area Improvements
166

2. In vehicular-traffic areas, use NPS 4 cast-iron soil pipe and fittings for piping branch fittings and riser extensions to cleanout. Set cleanout frames and covers in a cast-in-place concrete anchor, 18 by 18 by 12 inches in depth. Set top of cleanout flush with grade. Cast-iron pipe may also be used for cleanouts in nonvehicular-traffic areas.

3. In nonvehicular-traffic areas, use NPS 4 Cast Iron or PVC pipe and fittings for piping branch fittings and riser extensions to cleanout. Set cleanout frames and covers in a cast- in-place concrete anchor, 12 by 12 by 4 inches (300 by 300 by 100 mm) in depth. Set top of cleanout plug 1 inch (25 mm) above grade.

B. Cleanouts for Underslab Subdrainage:

1. Install cleanouts and riser extensions from piping to top of slab. Locate cleanouts at beginning of piping run and at changes in direction. Install fittings so cleanouts open in direction of flow in piping.

2. Use NPS 4 cast-iron soil pipe and fittings for piping branch fittings and riser extensions to cleanout flush with top of slab.

1. CONNECTIONS
A. Comply with requirements for piping specified in Town of Lost Gatos guidelines.

FIELD QUALITY CONTROL
A. Testing and Inspections:

1. After installing drainage course to top of piping, test drain piping with water to ensure free flow before backfilling.

2. Remove obstructions, replace damaged components, and repeat test until results are satisfactory.

B. Drain piping will be considered defective if it does not pass tests and inspections.

C. Prepare test and inspection reports.

CLEANING
A. Clear interior of installed piping and structures of dirt and other superfluous material as work progresses.

Maintain swab or drag in piping and pull past each joint as it is completed. Place plugs in ends of uncompleted pipe at end of each day or when work stops.

Page 203 ends

ITEM NO. 7.

AGREEMENT FOR SERVICES

Page 1 of 6 ends

Agreement for Services
Ninyo & Moore

AGREEMENT FOR PROFESSIONAL SERVICES

PREAMBLE
THIS AGREEMENT is by and between TOWN OF LOS GATOS, a California municipal corporation, (“Town”) and Ninyo & Moore (“Contractor”), a Corporation whose address is 1301 Marina Village Parkway, Suite 110, Alameda, CA 94501. This Agreement is made with reference to the following facts.

I. RECITALS
A. Town desires to engage Consultant to provide materials testing and special inspection services for the Oak Meadow Bandstand Area Improvement Project.

B. Consultant represents and affirms that it is willing to perform the desired work pursuant to this Agreement.

C. Consultant warrants it possesses the distinct professional skills, qualifications, experience, and resources necessary to timely perform the services described in this Agreement. Consultant acknowledges Town has relied upon these warranties to retain the Consultant.

II. AGREEMENT
A. Scope of Services. Consultant shall provide services as described in the Scope of Services, which is hereby incorporated by reference and attached as Exhibit A.

B. Term. The term of this Agreement shall be from upon execution to Thursday, December 31, 2026.

C. Compliance with Laws. The Consultant shall comply with all applicable laws, codes, ordinances, and regulations of governing federal, state and local laws. Consultant represents and warrants to Town that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for the Consultant to practice its profession. Consultant shall maintain a Town of Los Gatos business license as required in Chapter 14 of the Code of the Town of Los Gatos.

D. Sole Responsibility. Consultant shall be responsible for employing or engaging all persons necessary to perform the services under this Agreement.

E. Information/Report Handling. All documents furnished to Consultant by the Town and all reports and supportive data prepared by the Consultant under this Agreement are the Town’s property and shall be delivered to the Town upon the completion of services or at the Town's written request. All reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of its services pursuant to this Agreement are confidential until released by the Town to the public, and the Consultant shall not make any of these documents or information available to any individual or organization not employed by the Consultant or the Town without the written consent of the Town before such release. The Town acknowledges that the reports to be prepared by the Consultant pursuant to this Agreement are for the purpose of evaluating a defined project, and Town's use of the information contained in the reports prepared by the Consultant in connection with other projects shall be solely at Town's risk, unless the Consultant expressly consents to such use in writing. Town further agrees that it will not appropriate any methodology or technique of Consultant which is and has been confirmed in writing by Consultant to be a trade secret of Consultant.

ATTACHMENT 5

Page 204 ends

ITEM NO. 7.

Page 2 of 6 ends

Agreement for Services
Ninyo & Moore
F. Compensation: Compensation for Consultant's professional services shall not exceed $9,880.00 at the rates set forth in Exhibit A which is attached and incorporated by reference. Payment shall be based upon Town approval of each task.

G. Billing. Billing shall be monthly by invoice within thirty (30) days of the rendering of the service and shall be accompanied by a detailed explanation of the work performed by whom at what rate and on what date. Also, plans, specifications, documents or other pertinent materials shall be submitted for Town review, even if only in partial or draft form.

Payment shall be net thirty (30) days. All invoices and statements to the Town shall be addressed as follows:

Invoices: Town of Los Gatos
Attn: Accounts Payable
P.O. Box 655
Los Gatos, CA 95031-0655
Email (preferred): [email protected]
H. Availability of Records. Consultant shall maintain the records supporting this billing for not less than three years following completion of the work under this Agreement. Consultant shall make these records available to authorized personnel of the Town at the Consultant offices during business hours upon written request of the Town.

I. Assignability and Subcontracting. The services to be performed under this Agreement are unique and personal to the Consultant. No portion of these services shall be assigned or subcontracted without the written consent of the Town.

J. Independent Contractor. It is understood that the Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and not an agent or employee of the Town. As an independent contractor he/she shall not obtain any rights to retirement benefits or other benefits which accrue to Town employee(s). With prior written consent, the Consultant may perform some obligations under this Agreement by subcontracting, but may not delegate ultimate responsibility for performance or assign or transfer interests under this Agreement. Consultant agrees to testify in any litigation brought regarding the subject of the work to be performed under this Agreement. Consultant shall be compensated for its costs and expenses in preparing for, traveling to, and testifying in such matters at its then current hourly rates of compensation, unless such litigation is brought by Consultant or is based on allegations of Consultant's negligent performance or wrongdoing.

K. Conflict of Interest. Consultant understands that its professional responsibilities are solely to the Town. The Consultant has and shall not obtain any holding or interest within the Town of Los Gatos. Consultant has no business holdings or agreements with any individual member of the Staff or management of the Town or its representatives, nor shall it enter into any such holdings or agreements. In addition, Consultant warrants that it does not presently and shall not acquire any direct or indirect interest adverse to those of the Town in the subject of this Agreement, and it shall immediately disassociate itself from such an interest, should it discover it has done so and shall, at the Town's sole discretion, divest itself of such interest. Consultant shall not knowingly and shall take reasonable steps to ensure that it does not employ a person having such an interest in this performance of this Agreement. If after employment of a person Consultant discovers it has employed a person

Page 205 ends

ITEM NO. 7.

Page 3 of 6 ends

Agreement for Services
Ninyo & Moore
with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant shall promptly notify Town of this employment relationship, and shall, at the Town's sole discretion, sever any such employment relationship.

L. Non-Discrimination. Consultant warrants that it is an equal opportunity employer and shall comply with applicable regulations governing equal employment opportunity. Neither Consultant nor its subcontractors do and neither shall discriminate against persons employed or seeking employment with them on the basis of age, sex, color, race, marital status, sexual orientation, ancestry, physical or mental disability, national origin, religion, or medical condition, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment & Housing Act.

III. INSURANCE AND INDEMNIFICATION
A. Minimum Scope of Insurance:

1. Consultant agrees to have and maintain, for the duration of the contract, General Liability insurance policies insuring him/her and his/her firm to an amount not less than: two million dollars ($2,000,000) combined single limit per occurrence for bodily injury, personal injury and property damage.

2. Consultant agrees to have and maintain for the duration of the contract, an Automobile Liability insurance policy ensuring him/her and his/her staff to an amount not less than one million dollars ($1,000,000) combined single limit per accident for bodily injury and property damage.

3. Consultant shall provide to the Town all certificates of insurance, with original endorsements effecting coverage. Service Provider agrees that all certificates and endorsements are to be received and approved by the Town before work commences.

4. Consultant agrees to have and maintain, for the duration of the contract, professional liability insurance in amounts not less than $1,000,000 which is sufficient to insure Consultant for professional errors or omissions in the performance of the particular scope of work under this agreement.

B. General Liability:

1. The Town, its elected and appointed officials, employees, and agents are to be covered as insured as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of Consultant, premises owned or used by the Consultant.

2. The Consultant's insurance coverage shall be primary insurance as respects the Town, its elected and appointed officials, employees, and agents. Any insurance or self-insurances maintained by the Town, its officers, officials, employees or agents shall be excess of the Consultant's insurance and shall not contribute with it.

3. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the Town, its officers, officials, employees or agents.

4. Consultant's insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the limits of the insurer's liability.

Page 206 ends

ITEM NO. 7.

Page 4 of 6 ends

Agreement for Services
Ninyo & Moore
C. All Coverages. Each insurance policy required in this item shall be endorsed to state that coverage shall not be suspended, voided, cancelled, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the Town. Current certification of such insurance shall be kept on file at all times during the term of this agreement with the Town Clerk.

D. Workers’ Compensation. In addition to these policies, Consultant shall have and maintain Workers' Compensation insurance as required by California law and shall provide evidence of such policy to the Town before beginning services under this Agreement. Further, Consultant shall ensure that all subcontractors employed by Consultant provide the required Workers' Compensation insurance for their respective employees. As required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than one million dollars ($1,000,000) per accident for bodily injury or disease.

E. Indemnification. The Consultant shall indemnify the Town its elected and appointed officials, employees and agents from all damages, liabilities, penalties, costs, or expenses in law or equity that may at any time arise or be set up because of damages to property or personal injury received by reason of, or in the course of performing work which may be occasioned by any act or omissions of the Consultant, or any of the Consultant's officers, employees, or agents or any subconsultant. Consultant shall defend the Town against any such claims.

IV. GENERAL TERMS
A. Waiver. No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder, nor does waiver of a breach or default under this Agreement constitute a continuing waiver of a subsequent breach of the same or any other provision of this Agreement.

B. Governing Law. This Agreement, regardless of where executed, shall be governed by and construed to the laws of the State of California. Venue for any action regarding this Agreement shall be in the Superior Court of the County of Santa Clara.

C. Termination of Agreement. The Town and the Consultant shall have the right to terminate this agreement with or without cause by giving not less than fifteen days (15) written notice of termination. In the event of termination, the Consultant shall deliver to the Town all plans, files, documents, reports, performed to date by the Service Provider. In the event of such termination, Town shall pay Consultant an amount that bears the same ratio to the maximum contract price as the work delivered to the Town bears to completed services contemplated under this Agreement, unless such termination is made for cause, in which event, compensation, if any, shall be adjusted in light of the particular facts and circumstances involved in such termination.

D. Amendment. No modification, waiver, mutual termination, or amendment of this Agreement is effective unless made in writing and signed by the Town and the Consultant.

E. Notices. Any notice required to be given shall be deemed to be duly and properly given if mailed postage prepaid, and addressed to:

Town of Los Gatos
Attn: Town Clerk
110 E. Main Street, Los Gatos, CA 95030

Page 207 ends

ITEM NO. 7.

Page 5 of 6 ends

Agreement for Services
Ninyo & Moore
Ninyo & Moore
1301 Marina Village Parkway, Suite 110, Alameda, CA 94501 or personally delivered to Consultant to such address or such other address as Consultant designates in writing to Town.

F. Order of Precedence. In the event of any conflict, contradiction, or ambiguity between the terms and conditions of this Agreement in respect of the Products or Services and any attachments to this Agreement, then the terms and conditions of this Agreement shall prevail over attachments or other writings.

G. Entire Agreement. This Agreement, including all Exhibits, constitutes the complete and exclusive statement of the Agreement between the Town and Consultant. No terms, conditions, understandings or agreements purporting to modify or vary this Agreement, unless hereafter made in writing and signed by the party to be bound, shall be binding on either party.

Page 208 ends

ITEM NO. 7.

Page 6 of 6 ends

Agreement for Services
Ninyo & Moore
IN WITNESS WHEREOF, the Town and Consultant have executed this Agreement.

TOWN OF LOS GATOS: CONSULTANT: Ninyo and Moore Geotechnical & Environmental Sciences Consultants
**signature_85133**

SIGNATURE
Chris Constantin

FULL NAME
Town Manager
TITLE
**date_signed_85133**

DATE SIGNED
**signature_85136**

SIGNATURE
Lothus Hennefer

ENTER CONSULTANT SIGNATORY'S NAME
Principal/Consulting Services

ENTER CONSULTANT SIGNATORY'S TITLE
**date_signed_85136**

DATE SIGNED
Approved as to form:
**signature_85134**

SIGNATURE
Gabrielle Whelan

FULL NAME
Town Attorney
TITLE
**date_signed_85134**

DATE SIGNED
The execution date is the date on which the last party has signed.

Attachments:

A - Ninyo&Moore_Proposal

Page 209 ends

ITEM NO. 7.

PREPARED BY: James Watson
Senior Civil Engineer
Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, and Administrative Services Director
110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov

TOWN OF LOS GATOS

COUNCIL AGENDA REPORT
MEETING DATE: 04/07/2026
ITEM NO: 8
DATE: April 7, 2026
TO: Mayor and Town Council
FROM: Chris Constantin, Town Manager
SUBJECT: Authorize the Town Manager to Execute a First Amendment to the Agreement for Consultant Services with CSG Consultants, Inc., to Extend the Term of the Agreement
RECOMMENDATION: Authorize the Town Manager to execute a First Amendment to the Agreement for Consultant Services with CSG Consultants, Inc., to extend the term of the agreement for encroachment permit plan review and inspection services related to Comcast projects for a term of one year.

FISCAL IMPACT:

There is no fiscal impact associated with this action. This agreement is fully funded through applicant (Comcast) deposits collected by the Town for encroachment permit review and inspection services by the consultant (CSG). The Town issues Authorizations to Proceed to the consultant based on available deposit balances, ensuring that all consultant costs are fully reimbursed and that no General Fund or other Town funds are utilized.

The agreement includes a not-to-exceed amount of $500,000; however, expenditures are limited to funds received from Comcast, resulting in no net fiscal impact to the Town. This structure eliminates financial exposure to the Town by ensuring services are only authorized when sufficient third-party funding is available.

STRATEGIC PRIORITIES:

This project specifically supports the Town’s 2025-2027 Strategic Priorities Core Goals of Quality Public Infrastructure and Public Safety.

Page 210 ends

ITEM NO. 8.

PAGE 2 OF 3
SUBJECT: Consider Authorizing the Town Manager to Execute a First Amendment Extending the CSG Encroachment Review and Inspection Services – Comcast Contract
DATE: April 7, 2026
BACKGROUND:

Encroachment permits are used by the Town to control work in the public right-of-way and on Town property. Encroachment permit applications vary in scope from general maintenance activities, such as inspection of overhead electrical appurtenances from a bucket truck to installation of new facilities such as fiber optic lines buried along the side of the road.

Encroachment permit applications are required to ensure Town Codes are followed, and work in the right-of-way is done safely with proper traffic control that accommodates all modes of transportation through the work area.

The Town continues to receive and process a significant number of encroachment permit applications due to the expansion of new telecommunication technologies in the area, including fiber optic wired connections to homes.

On January 21, 2025, the Town Council authorized the Town Manager to execute an agreement with CSG Consultants to provide plan review and inspection services of the proposed Comcast encroachment permits. The original contract term will expire June 30, 2026.

DISCUSSION:

With the recent expansion of fiber optic technologies and infrastructure in the Town by multiple telecommunication companies, staff have observed an increase in encroachment permit applications both in quantity and scope. To ensure success in meeting the Town’s Strategic Priorities, the Town augmented the encroachment permit review process by using consultant services. Amending this agreement will provide staff with support to meet the continued demand for Comcast encroachment permit plan review and inspection services.

CONCLUSION:

Approval of this amendment will ensure the Town maintains timely and effective review and inspection of encroachment permit work in the public right-of-way, supporting public safety, infrastructure protection, and efficient service delivery. The cost of CSG’s services will be borne by Comcast. Therefore, authorization to amend this on-call consultant services contract with CSG will benefit the Town without financial impact.

COORDINATION:

This staff report has been coordinated with the Finance Department.

Page 211 ends

ITEM NO. 8.

PAGE 3 OF 3
SUBJECT: Consider Authorizing the Town Manager to Execute a First Amendment Extending the CSG Encroachment Review and Inspection Services – Comcast Contract
DATE: April 7, 2026
ENVIRONMENTAL ASSESSMENT:

This is not a project defined under CEQA, and no further action is required.

Attachments:

1. First Amendment to CSG Services Agreement for Comcast EP Review

2. Original CSG Agreement

Page 212 ends

ITEM NO. 8.

AMENDMENT TO AGREEMENT

Page 1 of 1 ends

Amendment to Agreement
CSG Consultants, Inc.

This AMENDMENT TO AGREEMENT amends that certain agreement titled Agreement for Consultant Services dated January 21, 2025, made by and between the Town of Los Gatos, ("Town,") and CSG Consultants, Inc. (“Contractor”), a Corporation and whose address is 550 Pilgrim Drive, Foster City, CA 94404.

A. Town and Contractor entered into an Agreement for Consultant Services on January 21, 2025 (“Agreement”).

B. The parties desire to amend the Agreement in order to extend the term and time of performance by one year.

AMENDMENT
A. Section 2.2 Term and Time of Performance - is amended to read: This contract will remain in effect upon execution through June 30, 2027. Consultant shall perform the services described in this agreement as described in Exhibit A.

B. All other terms and conditions of the Agreement remain in full force and effect.

Attachments:

A - Scope of Services
ATTACHMENT 1

Page 213 ends

ITEM NO. 8.

TOWN OF LOS GATOS CSG Consultants, Inc.
**signature_68203**

SIGNATURE
Chris Constantin

FULL NAME
Town Manager
TITLE
**date_signed_68203**

DATE SIGNED
**signature_68204**

SIGNATURE
Cyrus Kianpour

CONTRACTOR SIGNATORY'S FULL NAME
President

CONTRACTOR SIGNATORY'S TITLE
**date_signed_68204**

DATE SIGNED
Approved as to form:
**signature_68205**

SIGNATURE
Gabrielle Whelan

FULL NAME
Town Attorney
TITLE
**date_signed_68205**

DATE SIGNED
The execution date is the date on which the last party has signed.

Page 214 ends

ITEM NO. 8.

Exhibits List
A - Scope of Services

Page 215 ends

ITEM NO. 8.

Exhibit A
Scope of Services

Page 216 ends

ITEM NO. 8.
550 Pilgrim Drive
Foster City, CA 94404
phone 650.522.2500
fax 650.522.2599
www.csgengr.com
FOSTER CITY | PLEASANTON | SAN JOSE | SACRAMENTO | NEWMAN | ORANGE December 12, 2024
Gary Heap,
Town Engineer
Town of Los Gatos
41 Miles Avenue
Los Gatos, CA 95030
RE: Comcast Encroachment Permit Plan Review - Proposal
Dear Gary:

CSG Consultants, Inc. is pleased to present this proposal to assist the Town of Los Gatos with Plan Review for the Comcast Encroachment permit application.

Comcast proposes to install communication lines within the Town of Los Gatos Public Right-of-Way..

Work to be performed under this proposal will include the following:

Plan Review
1) Plan Review:

Review plans for conflicts with existing surface improvements.

Review plans for conflicts with existing utilities. Identify utilities that may require potholing prior to construction.

Review plans for consistency with Town trench resurfacing standards.

Confirm plans show appropriate repairs to other surface improvements (concrete, pavers, landscaping) where these improvements are impacted.
2) Prepare a comment letter for each review. Meet with staff and/or the applicant as needed to review comments and how comments will be addressed.
3) Complete subsequent reviews as needed.
4) Review traffic control plans and provide comment letters and meet with Town staff and Comcast as needed.
5) Attend other meetings as needed.

Sandra Meditch, P.E., will serve as the point of contact, oversee plan review work, and conduct QA/QC.

Fee
Our fee for performing the work described above will be on a time and materials basis, based on our 2024 Standard Fee Schedule. See attached.

Page 217 ends

ITEM NO. 8.
2 Inspection Services
CSG stands ready to provide inspection services if and when needed. Enforcing traffic control requirements and the permit provisions are vital on this type of work. Also working closely with the contractor to ensure all utilities are marked and trenches are backfilled according to project plans and difficult to arrive at a cost at this time. However, as a place holder we suggest the Town set aside $10,000 to be finalized upon the determination of the level of effort desired by the Town and number of working days dictated by the contract.

Thank you for considering CSG Consultants for this work. We look forward to working with you on this project. Please feel free to call Sandra Meditch at (650) 522-2629 if you would like to discuss this further.

Sincerely, _______________________________
Sandra A. Meditch, P.E.

Principal Engineer
cc: Hatem Ahmed, P.E.

Nourdin Khayata, P.E.

Sophie Truong, PE, PLS
Attachment

Page 218 ends

ITEM NO. 8.

Page 1 of 7 ends

Agreement for Consultant Services
CSG Consultants, Inc.

AGREEMENT FOR CONSULTANT SERVICES
THIS AGREEMENT is dated for identification on this 21st day of January 2025 by and between TOWN OF LOS GATOS, a California municipal corporation, (“Town”) and CSG Consultants, Inc. (“Consultant”), identified as a C Corporation and whose address is 550 Pilgrim Drive, Foster City, CA 94404. This Agreement is made with reference to the following facts.

I. RECITALS

1.1 The Town desires to engage Consultant to provide services to support the Comcast encroachment permit application plan review and inspection.

1.2 The Consultant represents and affirms that it is willing to perform the desired work pursuant to this Agreement.

1.3 Consultant warrants it possesses the distinct professional skills, qualifications, experience, and resources necessary to timely perform the services described in this Agreement.

Consultant acknowledges Town has relied upon these warranties to retain Consultant.

II. AGREEMENTS

2.1 Scope of Services. Consultant shall provide services as described in that certain proposal sent to the Town on December 12, 2024 which is hereby incorporated by reference and attached as Exhibit A.

2.2 Term and Time of Performance. This contract will remain in effect upon execution through June 30, 2026. Consultant shall perform the services described in this agreement as described in Exhibit A.

2.3 Compliance with Laws. The Consultant shall comply with all applicable laws, codes, ordinances, and regulations of governing federal, state and local laws. Consultant represents and warrants to Town that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Consultant to practice its profession. Consultant shall maintain a Town of Los Gatos business license pursuant to Chapter 14 of the Code of the Town of Los Gatos.

2.4 Sole Responsibility. Consultant shall be responsible for employing or engaging all persons necessary to perform the services under this Agreement.

2.5 Information/Report Handling. All documents furnished to Consultant by the Town and all reports and supportive data prepared by the Consultant under this Agreement are the Town’s property and shall be delivered to the Town upon the completion of Consultant's services or at the Town's written request. All reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of its services Docusign Envelope ID: 057417E1-AD91-4794-B30F-8185E6C4252A ATTACHMENT 2

Page 219 ends

ITEM NO. 8.

Page 2 of 7 ends

Agreement for Consultant Services
CSG Consultants, Inc.
pursuant to this Agreement are confidential until released by the Town to the public, and the Consultant shall not make any of the these documents or information available to any individual or organization not employed by the Consultant or the Town without the written consent of the Town before such release. The Town acknowledges that the reports to be prepared by the Consultant pursuant to this Agreement are for the purpose of evaluating a defined project, and Town's use of the information contained in the reports prepared by the Consultant in connection with other projects shall be solely at Town's risk, unless Consultant expressly consents to such use in writing. Town further agrees that it will not appropriate any methodology or technique of Consultant which is and has been confirmed in writing by Consultant to be a trade secret of Consultant.

2.6 Compensation. Compensation for the Consultant’s professional services shall be paid at the established hourly rates, as set forth in the Fee Schedule (Exhibit B), which is attached hereto. Payment shall be based upon Town approval of the Scope and Fee for each task and payment of fees by Comcast. The total not-to-exceed amount for this agreement shall not exceed $500,000.

2.7 Billing. Billing shall be monthly by invoice within thirty (30) days of the rendering of the service and shall be accompanied by a detailed explanation of the work performed by whom at what rate and on what date. Also, plans, specifications, documents or other pertinent materials shall be submitted for Town review, even if only in partial or draft form.

Payment shall be net thirty (30) days. All invoices and statements to the Town shall be addressed as follows:

Invoices:

Town of Los Gatos
Attn: Accounts Payable
P.O. Box 655
Los Gatos, CA 95031-0655
Email (preferred): [email protected]

2.8 Availability of Records. Consultant shall maintain the records supporting this billing for not less than three years following completion of the work under this Agreement. Consultant shall make these records available to authorized personnel of the Town at the Consultant's offices during business hours upon written request of the Town.

2.9 Assignability and Subcontracting. The services to be performed under this Agreement are unique and personal to the Consultant. No portion of these services shall be assigned or subcontracted without the written consent of the Town.

2.10 Independent Contractor. It is understood that the Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor Docusign Envelope ID: 057417E1-AD91-4794-B30F-8185E6C4252A

Page 220 ends

ITEM NO. 8.

Page 3 of 7 ends

Agreement for Consultant Services
CSG Consultants, Inc.
and not an agent or employee of the Town. As an independent contractor he/she shall not obtain any rights to retirement benefits or other benefits which accrue to Town employee(s). With prior written consent, the Consultant may perform some obligations under this Agreement by subcontracting, but may not delegate ultimate responsibility for performance or assign or transfer interests under this Agreement. Consultant agrees to testify in any litigation brought regarding the subject of the work to be performed under this Agreement. Consultant shall be compensated for its costs and expenses in preparing for, traveling to, and testifying in such matters at its then current hourly rates of compensation, unless such litigation is brought by Consultant or is based on allegations of Consultant's negligent performance or wrongdoing.

2.11 Conflict of Interest. Consultant understands that its professional responsibilities are solely to the Town. The Consultant has and shall not obtain any holding or interest within the Town of Los Gatos. Consultant has no business holdings or agreements with any individual member of the Staff or management of the Town or its representatives nor shall it enter into any such holdings or agreements. In addition, Consultant warrants that it does not presently and shall not acquire any direct or indirect interest adverse to those of the Town in the subject of this Agreement, and it shall immediately disassociate itself from such an interest, should it discover it has done so and shall, at the Town's sole discretion, divest itself of such interest. Consultant shall not knowingly and shall take reasonable steps to ensure that it does not employ a person having such an interest in this performance of this Agreement. If after employment of a person, Consultant discovers it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant shall promptly notify Town of this employment relationship, and shall, at the Town's sole discretion, sever any such employment relationship.

2.12 Equal Employment Opportunity. Consultant warrants that it is an equal opportunity employer and shall comply with applicable regulations governing equal employment opportunity. Neither Consultant nor its subcontractors do and neither shall discriminate against persons employed or seeking employment with them on the basis of age, sex, color, race, marital status, sexual orientation, ancestry, physical or mental disability, national origin, religion, or medical condition, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment & Housing Act.

III. INSURANCE AND INDEMNIFICATION

3.1 Minimum Scope of Insurance:
i. Consultant agrees to have and maintain, for the duration of the contract, General Liability insurance policies insuring him/her and his/her firm to an amount not less than: two million dollars ($2,000,000) combined single limit per occurrence for bodily injury, personal injury and property damage.

Docusign Envelope ID: 057417E1-AD91-4794-B30F-8185E6C4252A

Page 221 ends