ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
54 hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in connection with the Work. Each payroll record must contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:

1. The information contained in the payroll record is true and correct; and

2. Contractor or the Subcontractor has complied with the requirements of Labor Code §§ 1771, 1811, and 1815 for any Work performed by its employees on the Project.

B. Certified Record. A certified copy of an employee’s payroll record must be made available for inspection or furnished to the employee or his or her authorized representative on request, to Town, to the Division of Labor Standards Enforcement, to the Division of Apprenticeship Standards of the DIR, and as further required by the Labor Code.

C. Enforcement. Upon notice of noncompliance with Labor Code § 1776, Contractor or Subcontractor has ten days in which to comply with the requirements of this section. If Contractor or Subcontractor fails to do so within the ten-day period, Contractor or Subcontractor will forfeit a penalty of $100.00 per day, or portion thereof, for each worker for whom compliance is required, until strict compliance is achieved. Upon request by the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement, these penalties will be withheld from payments then due to Contractor.

9.5 Labor Compliance. Pursuant to Labor Code § 1771.4, the Contract for this Project is subject to compliance monitoring and enforcement by the DIR.

Article 10 - Safety Provisions

10.1 Safety Precautions and Programs. Contractor and its Subcontractors are fully responsible for safety precautions and programs, and for the safety of persons and property in the performance of the Work. Contractor and its Subcontractors must at all times comply with all applicable health and safety Laws and seek to avoid injury, loss, or damage to persons or property by taking reasonable steps to protect its employees and other persons at any Worksite, materials and equipment stored on or off site, and property at or adjacent to any Worksite.

A. Reporting Requirements. Contractor must immediately notify the Town of any death, serious injury or illness resulting from Work on the Project. Contractor must immediately provide a written report to Town of each recordable accident or injury occurring at any Worksite within 24 hours of the occurrence. The written report must include: (1) the name and address of the injured or deceased person; (2) the name and address of each employee of Contractor or of any Subcontractor involved in the incident; (3) a detailed description of the incident, including precise location, time, and names and contact information for known witnesses; and (4) a police or first responder report, if applicable. If Contractor is required to file an accident report with a government agency, Contractor will provide a copy of the report to Town.

B. Legal Compliance. Contractor’s safety program must comply with the applicable legal and regulatory requirements. Contractor must provide Town with copies of all notices required by Laws.

C. Contractor’s Obligations. Any damage or loss caused by Contractor arising from the Work which is not insured under property insurance must be promptly remedied by Contractor.

Page 112 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
55 D. Remedies. If Town determines, in its sole discretion, that any part of the Work or Project site is unsafe, Town may, without assuming responsibility for Contractor’s safety program, require Contractor or its Subcontractor to cease performance of the Work or to take corrective measures to Town’s satisfaction. If Contractor fails to promptly take the required corrective measures, Town may perform them and deduct the cost from the Contract Price. Contractor agrees it is not entitled to submit a Claim for damages, for an increase in Contract Price, or for a change in Contract Time based on Contractor’s compliance with Town’s request for corrective measures pursuant to this provision.

10.2 Hazardous Materials. Unless otherwise specified in the Contract Documents, this Contract does not include the removal, handling, or disturbance of any asbestos or other Hazardous Materials. If Contractor encounters materials on the Project site that Contractor reasonably believes to be asbestos or other Hazardous Materials, and the asbestos or other Hazardous Materials have not been rendered harmless, Contractor may continue Work in unaffected areas reasonably believed to be safe, but must immediately cease work on the area affected and report the condition to Town. No asbestos, asbestos-containing products or other Hazardous Materials may be used in performance of the Work.

10.3 Material Safety. Contractor is solely responsible for complying with § 5194 of Title 8 of the California Code of Regulations, including by providing information to Contractor’s employees about any hazardous chemicals to which they may be exposed in the course of the Work. A hazard communication program and other forms of warning and training about such exposure must be used. Contractor must also maintain Safety Data Sheets (“SDS”) at the Project site, as required by Laws, for materials or substances used or consumed in the performance of the Work. The SDS will be accessible and available to Contractor’s employees, Subcontractors, and Town.

A. Contractor Obligations. Contractor is solely responsible for the proper delivery, handling, use, storage, removal, and disposal of all materials brought to the Project site and/or used in the performance of the Work. Contractor must notify the Engineer if a specified product or material cannot be used safely.

B. Labeling. Contractor must ensure proper labeling on any material brought onto the Project site so that any persons working with or in the vicinity of the material may be informed as to the identity of the material, any potential hazards, and requirements for proper handling, protections, and disposal.

10.4 Hazardous Condition. Contractor is solely responsible for determining whether a hazardous condition exists or is created during the course of the Work, involving a risk of bodily harm to any person or risk of damage to any property.

If a hazardous condition exists or is created, Contractor must take all precautions necessary to address the condition and ensure that the Work progresses safely under the circumstances. Hazardous conditions may result from, but are not limited to, use of specified materials or equipment, the Work location, the Project site condition, the method of construction, or the way any Work must be performed.

10.5 Emergencies. In an emergency affecting the safety or protection of persons, Work, or property at or adjacent to any Worksite, Contractor must take reasonable and prompt actions to prevent damage, injury, or loss, without prior authorization from the Town if, under the circumstances, there is inadequate time to seek prior authorization from the Town.

Article 11 - Completion and Warranty Provisions

11.1 Final Completion.

Page 113 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
56 A. Final Inspection and Punch List. When the Work required by this Contract is fully performed, Contractor must provide written notification to Town requesting final inspection. The Engineer will schedule the date and time for final inspection, which must include Contractor’s primary representative for this Project and its superintendent. Based on that inspection, Town will prepare a punch list of any items that are incomplete, missing, defective, incorrectly installed, or otherwise not compliant with the Contract Documents. The punch list to Contractor will specify the time by which all of the punch list items must be completed or corrected. The punch list may include Town’s estimated cost to complete each punch list item if Contractor fails to do so within the specified time. The omission of any non-compliant item from a punch list will not relieve Contractor from fulfilling all requirements of the Contract Documents. Contractor’s failure to complete any punch list item within the time specified in the punch list will not waive or abridge its warranty obligations for any such items that must be completed by the Town or by a third party retained by the Town due to Contractor’s failure to timely complete any such outstanding item.

B. Requirements for Final Completion. Final Completion will be achieved upon completion or correction of all punch list items, as verified by Town’s further inspection, and upon satisfaction of all other Contract requirements, including any commissioning required under the Contract Documents and submission of all final submittals, including instructions and manuals as required under Section 7.10, and complete, final as-built drawings as required under Section 7.11, all to Town’s satisfaction.

C. Acceptance. The Project will be considered accepted upon Town Council action during a public meeting to accept the Project, unless the Engineer is authorized to accept the Project, in which case the Project will be considered accepted upon the date of the Engineer’s issuance of a written notice of acceptance. In order to avoid delay of Project close out, the Town may elect, acting in its sole discretion, to accept the Project as complete subject to exceptions for punch list items that are not completed within the time specified in the punch list.

D. Final Payment and Release of Retention. Final Payment and release of retention, less any sums withheld pursuant to the provisions of the Contract Documents, will not be made sooner than 35 days after recordation of the notice of completion. If Contractor fails to complete all of the punch list items within the specified time, Town may withhold up to 150% of Town’s estimated cost to complete each of the remaining items from Final Payment and may use the withheld retention to pay for the costs to self-perform the outstanding items or to retain a third party to complete any such outstanding punch list item.

11.2 Warranty.

A. General. Contractor warrants that all materials and equipment will be new unless otherwise specified, of good quality, in conformance with the Contract Documents, and free from defective workmanship and materials.

Contractor further warrants that the Work will be free from material defects not intrinsic in the design or materials required in the Contract Documents. Contractor warrants that materials or items incorporated into the Work comply with the requirements and standards in the Contract Documents, including compliance with Laws, and that any Hazardous Materials encountered or used were handled as required by Laws. At Town’s request, Contractor must furnish satisfactory evidence of the quality and type of materials and equipment furnished. Contractor’s warranty does not extend to damage caused by normal wear and tear, or improper use or maintenance.

Page 114 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
57 B. Warranty Period. Contractor’s warranty must guarantee its Work for a period of one year from the date of Project acceptance (the “Warranty Period”), except when a longer guarantee is provided by a supplier or manufacturer or is required by the Specifications or Special Conditions. Contractor must obtain from its Subcontractors, suppliers and manufacturers any special or extended warranties required by the Contract Documents.

C. Warranty Documents. As a condition precedent to Final Completion, Contractor must supply Town with all warranty and guarantee documents relevant to equipment and materials incorporated into the Work and guaranteed by their suppliers or manufacturers.

D. Subcontractors. The warranty obligations in the Contract Documents apply to Work performed by Contractor and its Subcontractors, and Contractor agrees to be co-guarantor of such Work.

E. Contractor’s Obligations. Upon written notice from Town to Contractor of any defect in the Work discovered during the Warranty Period, Contractor or its responsible Subcontractor must promptly correct the defective Work at its own cost. Contractor’s obligation to correct defects discovered during the Warranty Period will continue past the expiration of the Warranty Period as to any defects in Work for which Contractor was notified prior to expiration of the Warranty Period. Work performed during the Warranty Period (“Warranty Work”) will be subject to the warranty provisions in this Section 11.2 for a one-year period that begins upon completion of such Warranty Work to Town’s satisfaction.

F. Town’s Remedies. If Contractor or its responsible Subcontractor fails to correct defective Work within ten days following notice by Town, or sooner if required by the circumstances, Town may correct the defects to conform with the Contract Documents at Contractor’s sole expense. Contractor must reimburse Town for its costs in accordance with subsection (H), below.

G. Emergency Repairs. In cases of emergency where any delay in correcting defective Work could cause harm, loss or damage, Town may immediately correct the defects to conform with the Contract Documents at Contractor’s sole expense. Contractor or its surety must reimburse Town for its costs in accordance with subsection (H), below.

H. Reimbursement. Contractor must reimburse Town for its costs to repair under subsections (F) or (G), above, within 30 days following Town’s submission of a demand for payment pursuant to this provision. If Town is required to initiate legal action to compel Contractor’s compliance with this provision, and Town is the prevailing party in such action, Contractor and its surety are solely responsible for all of Town’s attorney’s fees and legal costs expended to enforce Contractor’s warranty obligations herein, in addition to any and all costs Town incurs to correct the defective Work.

11.3 Use Prior to Final Completion. Town reserves the right to occupy or make use of the Project, or any portions of the Project, prior to Final Completion if Town has determined that the Project or portion of it is in a condition suitable for the proposed occupation or use, and that it is in its best interest to occupy or make use of the Project, or any portions of it, prior to Final Completion.

A. Non-Waiver. Occupation or use of the Project, in whole or in part, prior to Final Completion will not operate as acceptance of the Work or any portion of it, nor will it operate as a waiver of any of Town’s rights or Contractor’s duties pursuant to these Contract Documents, and will not affect nor bear on the determination of

Page 115 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
58 the time of substantial completion with respect to any statute of repose pertaining to the time for filing an action for construction defect.

B. Town’s Responsibility. Town will be responsible for the cost of maintenance and repairs due to normal wear and tear with respect to those portions of the Project that are being occupied or used before Final Completion.

The Contract Price or the Contract Time may be adjusted pursuant to the applicable provisions of these Contract Documents if, and only to the extent that, any occupation or use under this Section actually adds to Contractor’s cost or time to complete the Work within the Contract Time.

11.4 Substantial Completion. For purposes of determining “substantial completion” with respect to any statute of repose pertaining to the time for filing an action for construction defect, “substantial completion” is deemed to mean the last date that Contractor or any Subcontractor performs Work on the Project prior to Town acceptance of the Project, except for warranty work performed under this Article.

Article 12 - Dispute Resolution

12.1 Claims. This Article applies to and provides the exclusive procedures for any Claim arising from or related to the Contract or performance of the Work.

A. Definition. “Claim” means a separate demand by Contractor, submitted in writing by registered or certified mail with return receipt requested, for a change in the Contract Time, including a time extension or relief from liquidated damages, or a change in the Contract Price, when the demand has previously been submitted to Town in accordance with the requirements of the Contract Documents, and which has been rejected or disputed by Town, in whole or in part. A Claim may also include that portion of a unilateral Change Order that is disputed by the Contractor.

B. Limitations. A Claim may only include the portion of a previously rejected demand that remains in dispute between Contractor and Town. With the exception of any dispute regarding the amount of money actually paid to Contractor as Final Payment, Contractor is not entitled to submit a Claim demanding a change in the Contract Time or the Contract Price, which has not previously been submitted to Town in full compliance with Article 5 and Article 6, and subsequently rejected in whole or in part by Town.

C. Scope of Article. This Article is intended to provide the exclusive procedures for submission and resolution of Claims of any amount and applies in addition to the provisions of Public Contract Code § 9204 and § 20104 et seq., which are incorporated by reference herein.

D. No Work Delay. Notwithstanding the submission of a Claim or any other dispute between the parties related to the Project or the Contract Documents, Contractor must perform the Work and may not delay or cease Work pending resolution of a Claim or other dispute, but must continue to diligently prosecute the performance and timely completion of the Work, including the Work pertaining to the Claim or other dispute.

E. Informal Resolution. Contractor will make a good faith effort to informally resolve a dispute before initiating a Claim, preferably by face-to-face meeting between authorized representatives of Contractor and Town.

12.2 Claims Submission. A Claim must be submitted in writing by registered or certified mail with return receipt requested, and must comply with the following requirements:

Page 116 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
59 A. Substantiation. The Claim must be submitted to Town in writing, clearly identified as a “Claim” submitted pursuant to this Article 12 and must include all of the documents necessary to substantiate the Claim including the Change Order request that was rejected in whole or in part, and a copy of Town’s written rejection that is in dispute. The Claim must clearly identify and describe the dispute, including relevant references to applicable portions of the Contract Documents, and a chronology of relevant events. Any Claim for additional payment must include a complete, itemized breakdown of all known or estimated labor, materials, taxes, insurance, and subcontract, or other costs. Substantiating documentation such as payroll records, receipts, invoices, or the like, must be submitted in support of each component of claimed cost. Any Claim for an extension of time or delay costs must be substantiated with a schedule analysis and narrative depicting and explaining claimed time impacts.

B. Claim Format and Content. A Claim must be submitted submitted in writing by registered or certified mail with return receipt requested in the following format:

1. Provide a cover letter, specifically identifying the submission as a “Claim” submitted under this Article 12 and specifying the requested remedy (e.g., amount of proposed change to Contract Price and/or change to Contract Time).

2. Provide a summary of each Claim, including underlying facts and the basis for entitlement, and identify each specific demand at issue, including the specific Change Order request (by number and submittal date), and the date of Town's rejection of that demand, in whole or in part.

3. Provide a detailed explanation of each issue in dispute. For multiple issues included within a single Claim or for multiple Claims submitted concurrently, separately number and identify each individual issue or Claim, and include the following for each separate issue or Claim:
a. A succinct statement of the matter in dispute, including Contractor’s position and the basis for that position;
b. Identify and attach all documents that substantiate the Claim, including relevant provisions of the Contract Documents, RFIs, calculations, and schedule analysis (see subsection (A), Substantiation, above);
c. A chronology of relevant events; and
d. Analysis and basis for claimed changes to Contract Price, Contract Time, or any other remedy requested.

4. Provide a summary of issues and corresponding claimed damages. If, by the time of the Claim submission deadline (below), the precise amount of the requested change in the Contract Price or Contract Time is not yet known, Contractor must provide a good faith estimate, including the basis for that estimate, and must identify the date by which it is anticipated that the Claim will be updated to provide final amounts.

5. Include the following certification, executed by Contractor’s authorized representative: “The undersigned Contractor certifies under penalty of perjury that its statements and representations in this Claim submittal are true and correct. Contractor warrants that this Claim submittal is comprehensive and complete as to the matters in dispute, and agrees that any costs, expenses, or delay not included herein are deemed waived.”

Page 117 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
60 C. Submission Deadlines.

1. A Claim disputing rejection of a request for a change in the Contract Time or Contract Price must be submitted within 30 days following the date that Town notified Contractor in writing that a request for a change in the Contract Time or Contract Price, duly submitted in compliance with Article 5 and Article 6, has been rejected in whole or in part. A Claim disputing the terms of a unilateral Change Order must be submitted within 30 days following the date of issuance of the unilateral Change Order. These Claim deadlines apply even if Contractor cannot yet quantify the total amount of any requested change in the Contract Time or Contract Price. If the Contractor cannot quantify those amounts, it must submit an estimate of the amounts claimed pending final determination of the requested remedy by Contractor.

2. With the exception of any dispute regarding the amount of Final Payment, any Claim must be filed on or before the date of Final Payment or will be deemed waived.

3. A Claim disputing the amount of Final Payment must be submitted within 30 days of the effective date of Final Payment, under Section 8.7, Final Payment.

4. Strict compliance with these Claim submission deadlines is necessary to ensure that any dispute may be mitigated as soon as possible, and to facilitate cost-efficient administration of the Project. Any Claim that is not submitted within the specified deadlines will be deemed waived by Contractor.

12.3 Town’s Response. Town will respond within 45 days of receipt of the Claim with a written statement identifying which portion(s) of the Claim are disputed, unless the 45-day period is extended by mutual agreement of Town and Contractor or as otherwise allowed under Public Contract Code § 9204. However, if Town determines that the Claim is not adequately substantiated pursuant to Section 12.2(A), Substantiation, Town may first request in writing, within 30 days of receipt of the Claim, any additional documentation supporting the Claim or relating to defenses to the Claim that Town may have against the Claim.

A. Additional Information. If additional information is thereafter required, it may be requested and provided upon mutual agreement of Town and Contractor. If Contractor’s Claim is based on estimated amounts, Contractor has a continuing duty to update its Claim as soon as possible with information on actual amounts in order to facilitate prompt and fair resolution of the Claim.

B. Non-Waiver. Any failure by Town to respond within the times specified above will not be construed as acceptance of the Claim, in whole or in part, or as a waiver of any provision of these Contract Documents.

12.4 Meet and Confer. If Contractor disputes Town’s written response, or Town fails to respond within the specified time, within 15 days of receipt of Town’s response or within 15 days of Town’s failure to respond within the applicable 45-day time period under Section 12.3, respectively, Contractor may notify Town of the dispute in writing sent by registered or certified mail, return receipt requested, and demand an informal conference to meet and confer for settlement of the issues in dispute. If Contractor fails to notify Town of the dispute and demand an informal conference to meet and confer in writing within the specified time, Contractor’s Claim will be deemed waived.

A. Schedule Meet and Confer. Upon receipt of the demand to meet and confer, Town will schedule the meet and confer conference to be held within 30 days, or later if needed to ensure the mutual availability of each of the individuals that each party requires to represent its interests at the meet and confer conference.

Page 118 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
61 B. Location for Meet and Confer. The meet and confer conference will be scheduled at a location at or near Town’s principal office.

C. Written Statement After Meet and Confer. Within ten working days after the meet and confer has concluded, Town will issue a written statement identifying which portion(s) of the Claim remain in dispute, if any.

D. Submission to Mediation. If the Claim or any portion remains in dispute following the meet and confer conference, within ten working days after the Town issues the written statement identifying any portion(s) of the Claim remaining in dispute, the Contractor may identify in writing disputed portion(s) of the Claim, which will be submitted for mediation, as set forth below.

12.5 Mediation and Government Code Claims.

A. Mediation. Within ten working days after the Town issues the written statement identifying any portion(s) of the Claim remaining in dispute following the meet and confer, Town and Contractor will mutually agree to a mediator, as provided under Public Contract Code § 9204. Mediation will be scheduled to ensure the mutual availability of the selected mediator and all of the individuals that each party requires to represent its interests.

If there are multiple Claims in dispute, the parties may agree to schedule the mediation to address all outstanding Claims at the same time. The parties will share the costs of the mediator and mediation fees equally, but each party is otherwise solely and separately responsible for its own costs to prepare for and participate in the mediation, including costs for its legal counsel or any other consultants.

B. Government Code Claims.

1. Timely presentation of a Government Code Claim is a condition precedent to filing any legal action based on or arising from the Contract. Compliance with the Claim submission requirements in this Article 12 is a condition precedent to filing a Government Code Claim.

2. The time for filing a Government Code Claim will be tolled from the time Contractor submits its written Claim pursuant to Section 12.2, above, until the time that Claim is denied in whole or in part at the conclusion of the meet and confer process, including any period of time used by the meet and confer process. However, if the Claim is submitted to mediation, the time for filing a Government Code Claim will be tolled until conclusion of the mediation, including any continuations, if the Claim is not fully resolved by mutual agreement of the parties during the mediation or any continuation of the mediation.

12.6 Tort Claims. This Article does not apply to tort claims and nothing in this Article is intended nor will be construed to change the time periods for filing tort-based Government Code Claims.

12.7 Arbitration. It is expressly agreed, under Code of Civil Procedure § 1296, that in any arbitration to resolve a dispute relating to this Contract, the arbitrator’s award must be supported by law and substantial evidence.

12.8 Burden of Proof and Limitations. Contractor bears the burden of proving entitlement to and the amount of any claimed damages. Contractor is not entitled to damages calculated on a total cost basis, but must prove actual damages.

Contractor is not entitled to speculative, special, or consequential damages, including home office overhead or any form of overhead not directly incurred at the Project site or any other Worksite; lost profits; loss of productivity; lost opportunity to work on other projects; diminished bonding capacity; increased cost of financing for the Project; extended capital costs; non-availability of labor, material or equipment due to delays; or any other indirect loss arising

Page 119 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
62 from the Contract. The Eichleay Formula or similar formula will not be used for any recovery under the Contract. The Town will not be directly liable to any Subcontractor or supplier.

12.9 Legal Proceedings. In any legal proceeding that involves enforcement of any requirements of the Contract Documents, the finder of fact will receive detailed instructions on the meaning and operation of the Contract Documents, including conditions, limitations of liability, remedies, claim procedures, and other provisions bearing on the defenses and theories of liability. Detailed findings of fact will be requested to verify enforcement of the Contract Documents. All of the Town’s remedies under the Contract Documents will be construed as cumulative, and not exclusive, and the Town reserves all rights to all remedies available under law or equity as to any dispute arising from or relating to the Contract Documents or performance of the Work.

12.10 Other Disputes. The procedures in this Article 12 will apply to any and all disputes or legal actions, in addition to Claims, arising from or related to this Contract, including disputes regarding suspension or early termination of the Contract, unless and only to the extent that compliance with a procedural requirement is expressly and specifically waived by Town. Nothing in this Article is intended to delay suspension or termination under Article 13.

Article 13 - Suspension and Termination

13.1 Suspension for Cause. In addition to all other remedies available to Town, if Contractor fails to perform or correct Work in accordance with the Contract Documents, including non-compliance with applicable environmental or health and safety Laws, Town may immediately order the Work, or any portion of it, suspended until the circumstances giving rise to the suspension have been eliminated to Town’s satisfaction.

A. Notice of Suspension. Upon receipt of Town’s written notice to suspend the Work, in whole or in part, except as otherwise specified in the notice of suspension, Contractor and its Subcontractors must promptly stop Work as specified in the notice of suspension; comply with directions for cleaning and securing the Worksite; and protect the completed and in-progress Work and materials. Contractor is solely responsible for any damages or loss resulting from its failure to adequately secure and protect the Project.

B. Resumption of Work. Upon receipt of the Town’s written notice to resume the suspended Work, in whole or in part, except as otherwise specified in the notice to resume, Contractor and its Subcontractors must promptly remobilize and resume the Work as specified; and within ten days from the date of the notice to resume, Contractor must submit a recovery schedule, prepared in accordance with the Contract Documents, showing how Contractor will complete the Work within the Contract Time.

C. Failure to Comply. Contractor will not be entitled to an increase in the Contract Time or Contract Price for a suspension occasioned by Contractor’s failure to comply with the Contract Documents.

D. No Duty to Suspend. Town’s right to suspend the Work will not give rise to a duty to suspend the Work, and Town’s failure to suspend the Work will not constitute a defense to Contractor’s failure to comply with the requirements of the Contract Documents.

13.2 Suspension for Convenience. Town reserves the right to suspend, delay, or interrupt the performance of the Work in whole or in part, for a period of time determined to be appropriate for Town’s convenience. Upon notice by Town pursuant to this provision, Contractor must immediately suspend, delay, or interrupt the Work and secure the Project site as directed by Town except for taking measures to protect completed or in-progress Work as directed in the suspension notice, and subject to the provisions of Section 13.1(A) and (B), above. If Contractor submits a timely request for a Change Order in compliance with Articles 5 and 6, the Contract Price and the Contract Time will be equitably

Page 120 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
63 adjusted by Change Order pursuant to the terms of Articles 5 and 6 to reflect the cost and delay impact occasioned by such suspension for convenience, except to the extent that any such impacts were caused by Contractor’s failure to comply with the Contract Documents or the terms of the suspension notice or notice to resume. However, the Contract Time will only be extended if the suspension causes or will cause unavoidable delay in Final Completion. If Contractor disputes the terms of a Change Order issued for such equitable adjustment due to suspension for convenience, its sole recourse is to comply with the Claim procedures in Article 12.

13.3 Termination for Default. Town may declare that Contractor is in default of the Contract for a material breach of or inability to fully, promptly, or satisfactorily perform its obligations under the Contract.

Default. Events giving rise to a declaration of default include Contractor’s refusal or failure to supply sufficient skilled workers, proper materials, or equipment to perform the Work within the Contract Time; Contractor’s refusal or failure to make prompt payment to its employees, Subcontractors, or suppliers or to correct defective Work or damage; Contractor’s failure to comply with Laws, or orders of any public agency with jurisdiction over the Project; evidence of Contractor’s bankruptcy, insolvency, or lack of financial capacity to complete the Work as required within the Contract Time; suspension, revocation, or expiration and nonrenewal of Contractor’s license or DIR registration; dissolution, liquidation, reorganization, or other major change in Contractor’s organization, ownership, structure, or existence as a business entity; unauthorized assignment of Contractor’s rights or duties under the Contract; or any material breach of the Contract requirements.

A. Notice of Default and Opportunity to Cure. Upon Town’s declaration that Contractor is in default due to a material breach of the Contract Documents, if Town determines that the default is curable, Town will afford Contractor the opportunity to cure the default within ten days of Town’s notice of default, or within a period of time reasonably necessary for such cure, including a shorter period of time if applicable.

B. Termination. If Contractor fails to cure the default or fails to expediently take steps reasonably calculated to cure the default within the time period specified in the notice of default, Town may issue written notice to Contractor and its performance bond surety of Town’s termination of the Contract for default.

C. Waiver. Time being of the essence in the performance of the Work, if Contractor’s surety fails to arrange for completion of the Work in accordance with the Performance Bond within seven calendar days from the date of the notice of termination pursuant to paragraph (C), Town may immediately make arrangements for the completion of the Work through use of its own forces, by hiring a replacement contractor, or by any other means that Town determines advisable under the circumstances. Contractor and its surety will be jointly and severally liable for any additional cost incurred by Town to complete the Work following termination, where “additional cost” means all cost in excess of the cost Town would have incurred if Contractor had timely completed Work without the default and termination. In addition, Town will have the right to immediate possession and use of any materials, supplies, and equipment procured for the Project and located at the Project site or any Worksite on Town property for the purposes of completing the remaining Work.

D. Compensation. Within 30 days of receipt of updated as-builts, all warranties, manuals, instructions, or other required documents for Work installed to date, and delivery to Town of all equipment and materials for the Project for which Contractor has already been compensated, Contractor will be compensated for the Work satisfactorily performed in compliance with the Contract Documents up to the effective date of the termination pursuant to the terms of Article 8, Payment, subject to Town’s rights to withhold or deduct sums from payment otherwise due pursuant to Section 8.3, and excluding any costs Contractor incurs as a result of the termination,

Page 121 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
64 including any cancellation or restocking charges or fees due to third parties. If Contractor disputes the amount of compensation determined by Town, its sole recourse is to comply with the Claim Procedures in Article 12, by submitting a Claim no later than 30 days following notice from Town of the total compensation to be paid by Town.

E. Wrongful Termination. If Contractor disputes the termination, its sole recourse is to comply with the Claim procedures in Article 12. If a court of competent jurisdiction or an arbitrator later determines that the termination for default was wrongful, the termination will be deemed to be a termination for convenience, and Contractor’s damages will be strictly limited to the compensation provided for termination for convenience under Section 13.4, below. Contractor waives any claim for any other damages for wrongful termination including special or consequential damages, lost opportunity costs, or lost profits, and any award of damages is subject to Section 12.8, Burden of Proof and Limitations.

13.4 Termination for Convenience. Town reserves the right, acting in its sole discretion, to terminate all or part of the Contract for convenience upon written notice to Contractor.

A. Compensation to Contractor. In the event of Town’s termination for convenience, Contractor waives any claim for damages, including for loss of anticipated profits from the Project. The following will constitute full and fair compensation to Contractor, and Contractor will not be entitled to any additional claim or compensation:

1. Completed Work. The value of its Work satisfactorily performed as of the date notice of termination is received, based on Contractor’s schedule of values and unpaid costs for items delivered to the Project site that were fabricated for incorporation in the Work;

2. Demobilization. Demobilization costs specified in the schedule of values, or if demobilization costs were not provided in a schedule of values pursuant to Section 8.1, then based on actual, reasonable, and fully documented demobilization costs; and

3. Termination Markup. Five percent of the total value of the Work performed as of the date of notice of termination, including reasonable, actual, and documented costs to comply with the direction in the notice of termination for convenience, and demobilization costs, which is deemed to cover all overhead and profit to date.

B. Disputes. If Contractor disputes the amount of compensation determined by Town pursuant to paragraph (A), above, its sole recourse is to comply with the Claim procedures in Article 12, by submitting a Claim no later than 30 days following notice from Town of total compensation to be paid by Town.

13.5 Actions Upon Termination for Default or Convenience. The following provisions apply to any termination under this Article, whether for default or convenience, and whether in whole or in part.

A. General. Upon termination, Town may immediately enter upon and take possession of the Project and the Work and all tools, equipment, appliances, materials, and supplies procured or fabricated for the Project.

Contractor will transfer title to and deliver all completed Work and all Work in progress to Town.

B. Submittals. Unless otherwise specified in the notice of termination, Contractor must immediately submit to Town all designs, drawings, as-built drawings, Project records, contracts with vendors and Subcontractors,

Page 122 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
65 manufacturer warranties, manuals, and other such submittals or Work-related documents required under the terms of the Contract Documents, including incomplete documents or drafts.

C. Close Out Requirements. Except as otherwise specified in the notice of termination, Contractor must comply with all of the following:

1. Immediately stop the Work, except for any Work that must be completed pursuant to the notice of termination and comply with Town’s instructions for cessation of labor and securing the Project and any other Worksite(s).

2. Comply with Town’s instructions to protect the completed Work and materials, using best efforts to minimize further costs.

3. Contractor must not place further orders or enter into new subcontracts for materials, equipment, services or facilities, except as may be necessary to complete any portion of the Work that is not terminated.

4. As directed in the notice, Contractor must assign to Town or cancel existing subcontracts that relate to performance of the terminated Work, subject to any prior rights, if any, of the surety for Contractor’s performance bond, and settle all outstanding liabilities and claims, subject to Town’s approval.

5. As directed in the notice, Contractor must use its best efforts to sell any materials, supplies, or equipment intended solely for the terminated Work in a manner and at market rate prices acceptable to Town.

D. Payment Upon Termination. Upon completion of all termination obligations, as specified herein and in the notice of termination, Contractor will submit its request for Final Payment, including any amounts due following termination pursuant to this Article 13. Payment will be made in accordance with the provisions of Article 8, based on the portion of the Work satisfactorily completed, including the close out requirements, and consistent with the previously submitted schedule of values and unit pricing, including demobilization costs. Adjustments to Final Payment may include deductions for the cost of materials, supplies, or equipment retained by Contractor; payments received for sale of any such materials, supplies, or equipment, less re-stocking fees charged; and as otherwise specified in Section 8.3, Adjustment of Payment Application.

E. Continuing Obligations. Regardless of any Contract termination, Contractor’s obligations for portions of the Work already performed will continue and the provisions of the Contract Documents will remain in effect as to any claim, indemnity obligation, warranties, guarantees, submittals of as-built drawings, instructions, or manuals, record maintenance, or other such rights and obligations arising prior to the termination date.

Article 14 - Miscellaneous Provisions

14.1 Assignment of Unfair Business Practice Claims. Under Public Contract Code § 7103.5, Contractor and its Subcontractors agree to assign to Town all rights, title, and interest in and to all causes of action it may have under section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2 (commencing with § 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the Contract or any subcontract. This assignment will be effective at the time Town tenders Final Payment to Contractor, without further acknowledgement by the parties.

14.2 Provisions Deemed Inserted. Every provision of law required to be inserted in the Contract Documents is deemed to be inserted, and the Contract Documents will be construed and enforced as though such provision has been

Page 123 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
66 included. If it is discovered that through mistake or otherwise that any required provision was not inserted, or not correctly inserted, the Contract Documents will be deemed amended accordingly.

14.3 Waiver. Town’s waiver of a breach, failure of any condition, or any right or remedy contained in or granted by the provisions of the Contract Documents will not be effective unless it is in writing and signed by Town. Town’s waiver of any breach, failure, right, or remedy will not be deemed a waiver of any other breach, failure, right, or remedy, whether or not similar, nor will any waiver constitute a continuing waiver unless specified in writing by Town.

14.4 Titles, Headings, and Groupings. The titles and headings used and the groupings of provisions in the Contract Documents are for convenience only and may not be used in the construction or interpretation of the Contract Documents or relied upon for any other purpose.

14.5 Statutory and Regulatory References. With respect to any amendments to any statutes or regulations referenced in these Contract Documents, the reference is deemed to be the version in effect on the date that bids were due.

14.6 Survival. The provisions that survive termination or expiration of this Contract include Contract Section 11, Notice, and subsections 12.1, 12.2, 12.3, 12.4, 12.5, and 12.6 of Section 12, General Provisions; and the following provisions in these General Conditions: Section 2.2(J), Contractor’s Records, Section 2.3(C), Termination, Section 3.7, Ownership, Section 4.2, Indemnity, Article 12, Dispute Resolution, and Section 11.2, Warranty.

6. Special Conditions
Pre-Construction Conference. Town will designate a date and time for a pre-construction conference with Contractor following Contract execution. Project administration procedures and coordination between Town and Contractor will be discussed, and Contractor must present Town with the following information or documents at the meeting for Town’s review and acceptance before the Work commences:

1. Name, 24-hour contact information, and qualifications of the proposed on-site superintendent;

2. List of all key Project personnel and their complete contact information, including email addresses and telephone numbers during regular hours and after hours;

3. Staging plans that identify the sequence of the Work, including any phases and alternative sequences or phases, with the goal of minimizing the impacts on residents, businesses and other operations in the Project vicinity;

4. If required, traffic control plans associated with the staging plans that are signed and stamped by a licensed traffic engineer;

5. Water Pollution Control Plan;

6. Draft baseline schedule for the Work as required under Section 5.2 of the General Conditions, to be finalized within ten days after Town issues the Notice to Proceed;

7. 2 week public notification letter;

8. 2 day (48 hour) notice letter;

9. “No Parking” Sign;

Page 124 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
67 10. Breakdown of lump sum bid items, to be used for determining the value of Work completed for future progress payments to Contractor;

11. Schedule with list of Project submittals that require Town review, and list of the proposed material suppliers;

12. Plan for coordination with affected utility owner(s) and compliance with any related permit requirements;

13. Videotape and photographs recording the conditions throughout the pre-construction Project site, showing the existing improvements and current condition of the curbs, gutters, sidewalks, signs, landscaping, streetlights, structures near the Project such as building faces, canopies, shades and fences, and any other features within the Project area limits;

14. Any other documents specified in the Special Conditions or Notice of Potential Award.

School Zone Restrictions. To minimize impacts to daily school operations, the Contrator shall complete all pavement work adjacent to schools during the summer break, from June 8 to August 11, 2026.

The following segments are identified and designated as school zone priority and shall be constructed at the beginning of the project:

1. Brooklyn Avenue

2. New York Avenue

3. Roberts Road

4. Fisher Avenue

5. Nino Avenue
All paving activities including base repair, milling, paving, and striping must be completed within the summer break.

Work outside of this window will not be permitted unless approved in writing by the Engineer. Hours of work during this period shall be Monday through Friday, 8:00 am to 5:00 pm.

Any costs associated with the restrictions above shall be deemed included in the bid price. No additional compensation and no extension of time will be granted.

Close Out Requirements. Contractor’s close out requirements include the following, if applicable:

1. Contractor must replace, with thermoplastic, any existing striping within and adjacent to the Project site that is damaged during the Work. Partially damaged striping must be replaced in its entirety.

2. Contractor must replace any survey monuments that are damaged or removed during the Work, with a Record of Survey filed by a licensed land surveyor as required by California law.

3. Before removing any traffic control or street signs on the Project site, Contractor must take photographs showing their original locations. Upon completion of each phase of construction, Contractor must

Page 125 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
68 temporarily reset the signs at those locations. Contractor must then replace the signs permanently upon completion of the Work and the cost of their removal and replacement must be included in the Bid Proposal.

4. Contractor must maintain any rural mail boxes on the Project site and relocate them to their permanent locations as soon as possible in the course of the Work, to the satisfaction of the affected property owners and the postal service.

END OF SPECIAL CONDITIONS

7. General Constructions Requirements

7.1. General Constructions Requirements
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “General Construction Requirements” of the contract documents, shall be deemed included in the price paid for other contract items and no additional compensation shall be allowed therefore.

Project Plans
The attached “Locations of Work” found in Attachment A shall be considered as the Plans.

Mobilization
Mobilization shall not be separately paid for but shall be considered as included in the payments for other items of work.

This shall include full compensation for furnishing all labor and materials, including tools, equipment and incidentals, and for performing all of the work involved in placing, removing, storing, maintaining, moving to new locations, replacing and disposing of equipment and materials as specified in the Standard Specifications, these Contract Documents and as directed by the Engineer.

Order of Work
Order of Work shall conform to the provisions in Section 5-1.02, “Contract Components,” of the Standard Specifications and these Contract Documents.

At least five (5) working days before any work is started, the Contractor shall furnish to the Engineer a written schedule for the work, listing the dates on which individual areas are to be subject to project related work and the extent of impact caused by the work. Additionally, the Contractor shall submit any request for approval for special traffic consideration including but not limited to lane closures, etc. The Contractor shall thenceforth adhere diligently to said written schedule in the prosecution of the work.

Work for this project needs to be coordinated with the 2026 Annual Curb, Gutter, and Sidewalk Maintenance project.

Resurfacing work will generally follow the concrete work but certain work may need to occur around the same time. The Inspector shall be the main contact for the coordination of the work.

The Contractor shall complete all work adjacent to schools during the summer break in accordance with Section 6, Special Conditions, School Zone Restrictions.

Page 126 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
69 The street may not be available for work if scheduling is not requested by the Contractor and approved by the Engineer (5) working days prior to the desired workday.

Cooperation
Attention is directed to Section 5-1.36C, “Nonhighway Facilities,” of the Standard Specifications.

It is the Contractor’s responsibility to work with utility companies to coordinate the removal, relocation, raising to grade, installation of the new facilities, or any other utility work as shown on the plans or indicated in the specifications with the appropriate utility company. The Contractor shall provide advance notification and shall allow sufficient time and work space for the utility company to complete the work necessary.

If in the opinion of the Engineer, the Contractor’s operations are delayed by reason of utility facilities not being removed or relocated, the Contractor will be entitled to an extension of time only. The Contractor shall be entitled to no other compensation for such delay.

Progress Schedule
The Contractor shall submit a project progress schedule for approval by the Engineer within eight (8) Working Days, not including Saturdays, Sundays, and legal holidays from the date of the Notice of the Award of Contract or 3 days before the pre-construction conference, whichever comes first. Failure to submit an acceptable progress schedule shall result in rejection of the Contractor’s proposal. The progress schedule shall be in the form specified below unless otherwise specified in the Special Provision or approved by the Engineer. Updated progress schedules shall be provided by the Engineer monthly with the estimates of work required in Section 9-1.16, “Progress Payments,” of the Standard Specifications. No partial payments will be made for any work until an updated schedule has been submitted and approved by the Engineer. Updated schedules shall incorporate all current schedule information, including actual progress, approved time adjustments, and proposed changes in sequence and logic.

The Contractor must furnish a computerized schedule prepared by the critical path method (CPM) which shows the order in which the Contractor proposes to carry out the work; the sequence and interdependence of construction activities; all salient features of the work (including procurement of materials and equipment); the dates on which the Contractor will start the salient features of the work; and the scheduled dates for completing the said salient features.

The construction schedule shall include:

A. Time for submittals and reviews;
B. Time for fabrication and delivery of manufactured products for the work; and C. The interdependence of procurement and construction activities.

The construction schedule shall:

A. Be a timescaled network diagram referenced to specific calendar dates; B. Include time for the Engineer to review submittals or inspect the work; and C. Identify the activities which constitute the controlling operations or critical path.

The construction schedule shall not contain multiple critical paths.

Scheduling of change order work is the responsibility of the Contractor. The Contractor shall revise the schedule to incorporate all activities involved in completing the change order work, and submit a new schedule to the Engineer for review.

Page 127 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
70 Delays or changes to non-critical activities will not be considered for a contract time extension. Non-critical activities are those activities which when delayed, do not affect the contract completion time.

The project schedules submitted shall be consistent in all respects with the time and order of work requirements of the contract. The Engineer, at his or her sole discretion, retains the right to reject any and all construction schedules submitted by the Contractor, including when the Engineer determines that the Contractor has too many items on the Critical Path, or the logic of the schedule is in error, or if the Engineer determines salient items of work are missing from the schedule.

The Contractor shall complete all work adjacent to schools during the summer break in accordance with Section 6, Special Conditions, School Zone Restrictions.

Subject to the above provisions, nothing herein shall preclude the Contractor from early completion of the contract.

The Contractor shall submit updated progress schedules to the Engineer as a condition of approval for the monthly progress payments and final acceptance.

Record Drawings
The Contractor shall keep and maintain on the job site, one record set of drawings. On these, the Contractor shall mark all project conditions, locations, configurations, and any other changes or deviations which may vary from the details represented on the original contract documents, including buried or concealed construction and utility features which are revealed during the course of construction. Final payment will not be approved until the Contractor prepared record drawings have been delivered to the Engineer.

General Measurement and Payment Requirements
The Contractor shall submit in all field quantities completed to date for payment with each monthly pay estimate. The Contractor shall provide, in writing, who from their team will be responsible for field measuring quantities with the Town’s representative. Upon completion of a contract bid item, the Contractor’s representative shall field measure the final quantities with the Town’s representative. This agreed upon amount will be considered final and no re-measuring of these field quantities will be allowed without the approval of the Engineer. All supporting documentation required for payment of an item, shall be submitted by the Contractor within two pay periods following the work. Documentation submitted more than two pay periods after the work was completed will not be paid and the cost of this work shall be borne by the Contractor.

Truck Routes
Per the Town Ordinance Section 15.30.410, the following streets and highways or portions thereof within the Town limits are designated Truck Routes and are authorized for use by operators of trucks and other vehicles, which exceed a maximum gross weight of ten thousand (10,000) pounds:
• Highway 17
• Los Gatos-Saratoga Road (Highway 9)
• Los Gatos-Almaden Road
• Los Gatos Boulevard
• Blossom Hill Road
• Winchester Boulevard

Page 128 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
71 • Lark Avenue
Other Town streets are unauthorized for truck routes unless otherwise approved by the Engineer.

Hours of Work
Unless otherwise approved in writing by the Engineer or specified in these Contract Documents, the hours of work for this project are Monday through Friday, 8:00 AM to 5:00 PM.

The Contractor shall complete all work adjacent to schools during the summer break in accordance with Section 6, Special Conditions, School Zone Restrictions.

The work hours will be strictly enforced. The Engineer has full authority to implement the working hours and completely shut down the construction operations outside the hours of work specified. Should the provisions of this section not be met, liquidated damages of One Thousand Dollars ($1,000.00) for every 60-minute time period (or portion thereof) beyond the hours of work allowable shall be withheld from moneys due to the Contractor. 24-Hour Contact Number
The Contractor shall assign a project superintendent who has the complete authority to make decisions on behalf of the Contractor. The project superintendent shall be on the job at all times during construction and shall be available and on call 24 hours a day for the duration of the project. The Contractor shall provide to the Engineer and to the Los GatosMonte Sereno Police Department a 24-hour contact number for the project superintendent. This number shall not direct calls to a recorder or other message taking service.

Advance Public Notification
Two weeks prior to beginning any work in an area, the Contractor shall deliver written notice to all adjoining residents and businesses, tenants and other applicable parties listed below and all other properties where their only ingress/egress is through the project’s work area. Individual or separate notices shall be given for general construction activity in an area as well as specific activities (i.e. rubber chip seal, rubber cape seal, slurry seal, micro surfacing ), which will, in any way, inconvenience the resident/property owner/tenant or affect their operations or access to their properties. Such notices shall include the expected date for start of construction, a general description of the construction activity to take place, expected duration of the activity, and the name, address, and the contact number of the Contractor’s superintendent. The Contractor shall provide accurate information regarding the construction schedule and activities to be incorporated into the “two-week” notification. The Contractor shall make every effort to coordinate work with individual residents and businesses whose access will be disrupted in order to minimize the disruption and impacts on the resident or business.

For rubberized cape seal work, the Contractor shall provide and hand-deliver two (2), “two-day” notices. The first notice shall be distributed two working days prior to the rubberized chip seal placement. The second notice shall be distributed two days prior to the application of the slurry seal. The “two-day” notices shall be delivered to all adjoining residents and businesses, tenants, and other applicable parties listed below and any other properties whose sole ingress/egress is through the project’s work area.

For all other work, the Contractor shall provide and hand-deliver a “two-day” notice. The notice shall be distributed two working days prior to the work beginning. The “two-day” notice shall be delivered to all adjoining residents and business, tenants, and other applicable parties listed below and any other properties who sole ingress/egress is through the project’s work area.

Copies of all notices shall be provided to the Engineer for approval five (5) working days prior to the desired distribution date.

Page 129 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
72 Should the Contractor’s schedule change and/or differ in any capacity from the schedule initially mentioned in the notification to the resident/property owner/tenant or from the updates to the Town website, the Contractor shall renotify all applicable parties (residents/property owner/tenant and/or businesses mentioned below) five (5) working days prior to the beginning of any work on that street.

The Contractor shall contact and coordinate the work with the following parties throughout the project. The “two-week” and “two-day” notification shall also be given to the following parties prior to beginning any work:

Santa Clara Valley Transportation Agency–(408) 952-4106 West Valley Collection and Recycling–(408) 283-8500
U.S. Postal Service–Post Master–(408) 395-7526
Los Gatos/Monte Sereno Police Department–(408) 354-8600 Santa Clara County Fire Department–(408) 378-4010
The Contractor shall also give written notice to residents/businesses for any driveway closures or anticipated service disruptions. The Contractor shall coordinate all disruptions with the appropriate utility, property owner, resident, business and the Town. Notice shall be given in advance and specify the duration of the disruption of any utility, and the temporary closure of access to any driveway. Such notice will comply with the requirements for closure of driveway access as specified under Special Provision Section 10-2, “Traffic Control Requirements.” Lack of proper advance notification and coordination shall result in the work being shut down. All costs associated with the stoppage of work shall be borne by the Contractor.

Line and Grade
The Contractor shall layout the project by providing all stakes and marks needed to establish the lines and grades required for completion of the work specified on the Plans and in these Contract Documents to the satisfaction of the Engineer.

Meetings
Prior to commencement of any work on the project, a pre-construction conference will be scheduled by the Town and held at the Town’s Engineering Building or hosted via virtual meeting for the purpose of review and discussion of the project schedule and construction procedures. The Contractor’s project manager and/or project superintendent and representatives from all listed subcontractors shall be required to attend the pre-construction conference. The Contractor shall prepare and submit at the pre-construction meeting the proposed project schedule, water pollution control plan, traffic control plan, public notification letter, and other submittals as specified under Special Conditions.

The Contractor shall also schedule and conduct weekly field meetings at locations to be determined by the Town. The meetings shall be held at the same time and place each week and shall include all subcontractors working on the project and discussions of scheduled work on the project during the week of the meeting. The Contractor shall notify the Engineer of the time, date, and location of these meetings 72 hours in advance of the first meeting. Detailed schedules for the following two weeks shall be submitted to the Engineer at each weekly meeting.

Waste Haulers and Recycling Operations
The Contractor shall not impair or impede waste hauler and recycling operations scheduled to be conducted within the project area. It is the Contractor’s responsibility to determine which waste hauler and recycling operators are scheduled to operate within the project area, and to develop a project schedule that will not impair or impede the waste hauler or recycling operations.

Page 130 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
73 Project Appearance and Street Sweeping
The Contractor shall maintain a clean work site. Debris developed during construction shall be disposed concurrently with its generation. Stockpiling of debris or construction materials shall not be allowed unless otherwise approved by the Engineer.

The Town prohibits the use of any public property or public right-of-way locations as construction staging points, unless specifically approved by the Engineer.

Right-of-Way
The Contractor shall operate within the public right-of-way only.

Work in Private Property
The Contractor shall secure right-of-entry agreements with each private property owners before any work in private properties. The language for the right-of-entry agreement must be approved by the Town.

Materials Testing and Inspections
The Contractor shall coordinate with the Town to schedule materials testing and inspections for soil compaction and for other operations as instructed by the Engineer. The Contractor shall notify the Engineer, at minimum 72 hours in advance, of when compaction testing, inspections, and materials sampling need to be occur.

Staging/Disposal Areas
The Contractor shall survey the area for construction staging. Staging areas shall not be located in a residential area.

The following requirements shall apply to the contractor’s staging area:
• No stockpiles or staging area will be allowed in the right-of-way or on undeveloped lots unless specifically approved by the Engineer
• The staging area will be included in the Contractor's SWPPP • The staging area will not be located in an environmentally or culturally sensitive area and/or impact water resources (rivers, streams, bays, inlets, lakes, drainage sloughs). • The staging area will not be located in a regulatory floodway or within the base floodplain (100-year). • The staging area will not affect access to properties or roadways.

The Contractor shall obtain the approval of the Engineer before staging equipment or storing materials in the public right-of-way or on Town property. In addition, the Contractor shall provide proof of an agreement when using private property for staging, if requested by the Engineer.

All debris shall be hauled off and disposed of the same working day in which the material was generated.

Personal vehicles of the Contractor’s employees shall not be parked in the neighborhood or on the traveled way. When entering or leaving roadways carrying public traffic, the Contractor’s equipment, whether empty or loaded, shall in all cases yield to public traffic and shall travel in the normal direction of travel.

Dust Control
The following requirements shall be applicable to this contract in lieu of the requirements of Section 18, “Dust Palliatives,” of the Standard Specifications:

Page 131 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
74 A. The Contractor shall provide an acceptable plan for preventing the generation of dust due to the Contractor’s operations in the construction zones, along the haul routes, or equipment parking areas. This plan may consist of water sprinkling sweepers or an equivalent service. No separate payment will be made for dust control and all costs in connection therewith shall be included in the payment items to which the work is incidental.

B. In the event the control of dust is not satisfactory to the Owner, the Owner shall take such measures as may be necessary to ensure satisfactory dust control and deduct the cost of such measures from any payments due to the Contractor.

Water for Construction
The costs of water as required for the construction and post-construction on this project, including dust control, shall be considered as included in the costs of items bid for applicable item of work and no separate payment will be made therefor. The Contractor shall conform to the requirements of the water company from which water is purchased. In no case shall the Contractor violate the Town’s water conservation ordinance.

Sanitation
The Contractor shall provide for sanitary facilities for the use of the workers on the job. Such facilities shall be placed and maintained by the Contractor so as not to be a nuisance to the neighbors, nor offensive to the senses nor the community standards of decency. The Engineer shall be the sole judge of the adequacy of the facility, the placement, and the maintenance thereof. Upon notification by the Engineer of deficiencies in any of these areas, the Contractor shall make immediate corrections. Failure to take corrective action within 24 hours shall give the Engineer due cause to stop the work in the contract and to order the corrective work to be done on the sanitary facility and to charge all costs of such work against the monies due or to become due to the Contractor.

Water Pollution Control
Water pollution control work shall conform to the provisions in Section 13, “Water Pollution Control," of the Standard Specifications and these Contract Documents, with the exception of payment. Payment shall be covered under “Measurement and Payment” under these Technical Specifications.

The Contractor shall be responsible for ensuring that all work conforms to the “Best Management Practices for the Construction Industry” found in the Storm Water Pollution Prevention Plan (SWPPP), the “Blueprint for a Clean Bay” handout found in Attachment D and the Town Code found in Attachment E.

The Contractor shall comply with the requirements of the State Water Resource Control Board (SWRCB) National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharge Associated with Construction and Land Disturbance Activities.

The Contractor shall not violate any discharge prohibition contained in the California Regional Water Quality Control Board San Francisco Bay Basin Water Quality Control Plan (“Basin Plan”).

7.2. Traffic Control Requirements
Measurement and Payment
Full compensation for preparing traffic control plans, temporary pavement delineation, providing construction, changeable message and detour signs, and for furnishing all labor, materials, tools, equipment, and incidentals, and for

Page 132 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
75 doing all of the work involved in compliance with the Plans, Specifications, and “Traffic Control Requirements” of the Contract Documents, including any additional changeable message signs, shall be included and paid for in the appropriate bid item price.

Bid Item #1 Traffic Control L.S.

General
Traffic control shall conform to the provisions of Section 12 "Temporary Traffic Control" of the Standard Specifications, Part 6, “Temporary Traffic Control,” of the California Manual on Uniform Traffic Control Devices (CA MUTCD) with latest revisions, and these Technical Specifications. Nothing in these Technical Specifications shall be construed as relieving the Contractor from the responsibilities specified in Section 7-1.04, “Public Safety,” of the Standard Specifications and these Contract Documents.

The traffic control plan shall be prepared in compliance with the Caltrans Standard Plans and/or CA MUTCD and shall be prepared by a certified traffic engineer or a qualified traffic control professional. The Contractor shall submit a scaled drawing with detailed information, such as lanes to be closed or narrowed, time and days of operation, transitions, cones and barricades, signs, arrow boards, pedestrian and bicycle provisions, etc. The traffic control plan should show length of transitions, cone spacing, sign spacing, etc. based on the posted speed limits or the posted construction zone speed limits. The traffic control plan shall also include a provision for the Contractor to contact and coordinate with the Valley Transportation Authority (VTA) if a bus stop is affected.

The Contractor shall maintain a safe workplace throughout the job including, but not limited to, providing all flaggers, safety equipment, flashing arrow boards, changeable message signs (minimum of two), traffic control devices; maintenance of barricades, safe pedestrian passages along sidewalks, maintenance of handicap access throughout the project site where applicable and maintenance of pavement within the limits of the roadway and driveways with a suitable traffic bearing surface.

The Contractor shall provide and maintain all necessary traffic control devices to ensure safe pedestrian and vehicular access through and around the job site. Warning signs shall be installed at locations in accordance with the CA MUTCD, Part 6, “Temporary Traffic Control.” The Contractor shall fulfill the requirements of this section, 24 hours per day, seven days a week, including holidays, from the time the Notice to Proceed is issued until the project is formally accepted.

Should the Contractor fail to perform these duties, the Engineer, at the Engineer's sole discretion, may elect to have City, or contract forces, perform the duties, deducting the expenses incurred from any moneys that are due, or to become due, to the Contractor. By exercising this option, the Contractor is in no way relieved of the responsibility to perform these duties.

The Contractor shall provide a minimum of two competent and qualified flaggers dedicated solely to directing traffic if traffic lanes have been reduced to only one lane for two-way traffic, in and out of driveways and cross-streets and/or across the construction area as deemed to ensure safe traffic control during construction operations. Flaggers shall be equipped with all necessary tools to properly control the traffic.

Traffic Control/Management Plan
A traffic control plan shall be submitted by the Contractor to the Engineer a minimum of five (5) working days prior to any work commencing on the project. The traffic control plan shall be reviewed and accepted by the Engineer prior to any work commencing on the project. All traffic plans shall be prepared in accordance with the CA MUTCD, Part 6,

Page 133 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
76 “Temporary Traffic Control,” Section 12, “Temporary Traffic Control,” of the Standard Specifications, and these Contract Documents.

No Parking Signs
Prior to the start of work which requires parking restriction, the Contractor shall request approval to post and maintain temporary “No Parking” signs on each street where the operations will take place. It shall be the Contractor's responsibility to post "No Parking" signs in the areas where the Contractor's work will require restricted parking. The Town will provide signs for the Contractor's use. To be enforceable, the signs must be posted not less than 72 hours prior to the start of the work at a maximum spacing of 60 feet. The signs must clearly show the date(s) and hours of the parking prohibition, as well as the date and time the signs were posted, and the project name and contractor’s phone number. If the work is not performed during the timeframe indicated on the “No Parking” signs, the work will be rescheduled with at least five (5) working days advance notice. The Contractor shall perform all re-posting of “No Parking” signs and re-notification of businesses, tenants, and residents as a result of his failure to meet the posted schedule. Any delays caused by failure of the Contractor to adhere to the approved schedule will be at the Contractor’s sole expense. No additional compensation will be allowed for costs resulting from said delays.

The Contractor shall remove the “No Parking” signs immediately when they are no longer needed for use in the respective area of the project. The Contractor shall notify the Los Gatos/Monte Sereno Police Department directly after posting and immediately upon removal of the said signs at (408) 354-8600.

During the morning of each scheduled workday, the Contractor shall be responsible for calling the Los Gatos/Monte Sereno Police Department Police Dispatch to tow cars, if necessary, as approved by the Engineer. The Contractor shall have available for the police responding to the call photo documentation of the “No Parking” signs being posted if the signs were removed or vandalized the previous night.

Detours, Temporary Striping, and Barriers
Any approved detours or barriers, signing and striping necessary to complete the construction of the project shall be provided, installed, maintained, and removed by the Contractor at his expense. Temporary striping shall be self-sticking traffic marking tape, vinyl or otherwise, developed for such use, and shall be used for temporary striping as required, unless shown otherwise on the plans or specified in the Technical Specifications. No painted temporary striping or markings will be allowed unless the temporary markings will be entirely covered by the permanent markings.

Notify the Los Gatos/Monte Sereno Police Department daily at (408) 354-8600 of street or lane closures or detours within the roadway prior to setting up and upon removal of traffic control devices.

Additional Construction Area Signs and Controls
In addition to the requirements of the CA MUTCD, the following traffic controls will be required as specified by the Engineer. These additional requirements in no way relieve the Contractor from his obligation to comply with the standards set forth in that manual.
• "Road Work Ahead" (Type C-23(CA)) signs shall be posted in advance of the first major cross street before the start of the work zone to allow traffic to avoid the work zone prior to entering the zone. The signs shall also be posted at the approaches to the project site.
• "End Road Work" (Type G20-2) signs shall be placed at all public road exits from the project site. • The Contractor shall provide, install and maintain a minimum of four (4) lighted barricades for each individual construction site for concrete improvements (i.e. for curb and gutter removal & replacement and for accessibility ramp installation).

Page 134 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
77 • Changeable message signs will be used starting one (1) week prior to construction beginning and will be maintained in place until construction impacts to the public no longer exist as determined by the Engineer. • “Bikes May Use Full Lane” (R4-11)–modified for temporary construction sign The Contractor shall be responsible for locating existing poles on which to mount these signs or shall provide temporary stands or poles on which to place the required signs. The Engineer shall approve the method of attachment to existing poles prior to sign installation. No sign shall be mounted on decorative street light poles unless the Contractor can clearly show that the mounting method will not damage the finish on the poles.

Upon completion of the work, the signs and posts shall be removed and disposed of outside the public right of way in conformance with the provisions in the Standard Specifications.

Maintenance of Pedestrian Access and Circulation
Safe pedestrian access and circulation that is fully wheelchair accessible shall be maintained by the Contractor through or around the project area. All walkways, pedestrian crossings, ramps and other pedestrian facilities removed or blocked by the Contractor’s operations shall be replaced with temporary facilities unless otherwise approved by the Engineer.

Pedestrian access at each individual project site may be diverted for a maximum of five (5) calendar days with approved traffic control plan. Drop off from existing improvements to excavated areas shall be temporarily ramped. Ramps shall be maintained at 12:1 or flatter with compacted sub-grade or base rock material until final improvements are installed.

Lane Closures
Requests for lane closures shall be made a minimum of five working days prior to the proposed closure. Once the lane closure has been approved by the Town, the Contractor shall post a minimum of five (5) working days in advance of the proposed lane closure a changeable message sign at the limits of each closure or as specified by the Engineer. These changeable message signs shall also be used on the day of the actual closure. The changeable message signs shall indicate the days and hours of the proposed lane closure and the type of work being done during that lane closure.

Flashing arrow signs shall be used for all lane closures. The Contractor shall check with the Engineer to confirm any lane closure restrictions that may be in effect before closing any lanes.

The Contractor shall leave the streets open to traffic until just prior to starting the work, and will provide all barricades, signs and traffic control measures necessary to protect the work.

No work that interferes with public traffic shall be performed outside of the working hours, except as otherwise approved by the Engineer. All traffic lanes shall be open to traffic outside of the working hours.

A minimum of one paved, or surfaced traffic lanes and one paved bicycle lane, not less than fifteen (15) feet wide (10 foot wide for the traveled vehicle lane and 5 feet wide for the bicycle lane), shall be open for use by public traffic in each direction of travel. Traffic may not be routed over unpaved roadways unless authorized by the Engineer.

In addition, the full width of the traveled way on each street shall be open for public use on Saturdays and Sundays (except for those streets approved by the Engineer for weekend work), on designated legal holidays, and when construction operations are not actively in progress. Designated legal holidays are: January 1, the third Monday in January, the third Monday in February, June 19, the last Monday in May, July 4, the first Monday in September, the fourth Thursday of November, and December 25. When a designated holiday falls on a Saturday, the preceding Friday shall be treated as a legal holiday. When a designated holiday falls on a Sunday, the following Monday shall be treated as a legal holiday.

Page 135 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
78 Deviations from the requirements of this section concerning hours of work, which do not change the cost of the work, may be permitted upon the written request of the Contractor, if in the opinion of the Engineer, the general public will be better served and the work expedited. Such deviations shall not be implemented until the Engineer has provided the Contractor with written approval to do so. All other modifications will be made by contract change order.

The Contractor shall pay the Town liquidated damages in the amount of $1,000 per hour (or part of an hour) for traffic control that is set-up before the designated and approved hours of work. Liquidated damages for failure to open streets by the required time shall be $1,000.00 per hour.

Traffic Control System for Lane Closure
A traffic control system shall consist of closing traffic lanes in accordance with the details shown on Caltrans Standard Plans T10, T10A, T11, T11A, T12, T13, T13A, and T13B as shown in Attachment B, the provisions of Section 12, “Temporary Traffic Control,” of the Standard Specifications, and these Contract Documents.

The provisions in this section will not relieve the Contractor from the responsibility to provide additional devices or take measures as may be necessary to comply with the provisions of Section 7-1.04, “Public Safety,” of the Standard Specifications.

Each vehicle used to place, maintain and remove components of a traffic control system on multilane roads shall be equipped with a Type II flashing arrow sign which shall be in operation when the vehicle is being used for placing, maintaining, or removing the components. Vehicles equipped with a Type II flashing arrow sign not involved in placing, maintaining, or removing the components when operated within a stationary type lane closure shall only display the caution display mode. The sign shall be controllable by the operator of the vehicle while the vehicle is in motion.

If any component of the traffic control system is displaced, or ceases to operate or function as specified from any cause, during the progress of the work, the Contractor shall immediately repair the component to its original condition or replace the component, and shall restore the component to its original location.

When lane closures are made for work periods only, at the end of each work period, all components of the traffic control system, except portable delineators placed along open trenches or excavations adjacent to the traveled way, shall be removed from the traveled way and shoulder. If the Contractor so elects, the components may be stored at selected central locations, approved by the Engineer.

Temporary Pavement Delineation
Temporary pavement delineation shall comply with these Technical Specifications and with Section 12-3, “Temporary Traffic Control Devices,” of the Standard Specifications, CA MUTCD, and these Contract Documents.

Property Access Requirements
The Contractor shall maintain property access to all residents and businesses at all times unless otherwise approved by the Engineer. Upon approval by the Engineer, access to certain properties may be temporarily closed if all of the following conditions can be met:

A. No options exist to maintain property access and complete the project.

B. The Contractor has discussed the closure with the resident or business owner in person.

C. Residents or business owners has been notified, in writing, at least five (5) calendar days in advance of the time and length of closure

Page 136 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
79 D. Resident or business owners have been reminded of the closure, in writing, at least two (2) working days prior to the actual closure.

E. The Contractor has provided the resident or business with a contractor name and number to call with questions regarding the closure.

F. Closure will last no longer than three (3) working days Signalized Intersections
The Contractor shall be responsible for contacting and coordinating with the Town’s signal maintenance contractor for any work at signalized intersections. No additional working days will be given due to the Contractor for not scheduling the work with the Town’s signal maintenance contractor prior to the start of work.

8. Technical Specifications

8.1. TREE TRIMMING
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications, and “Tree Trimming" of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #2 Tree Trimming L.S.

Tree Protection
The Contractor shall comply with the Town Ordinance Chapter 29, Article 1, Division 2, “Tree Protection.” The Contractor shall provide protective tree fencing per the Town Ordinance Sec. 29.10.1005, “Protection of Trees During Construction.” The Engineer and Town Arborist shall be notified of any damages that occurs to a protected tree during construction.

Tree Trimming
If existing trees or shrubs, including median island planting, and private trees, encroach into the public right-of-way and threaten to obstruct the Contractor’s operation, the Contractor shall request permission to trim existing trees or shrubs, at least five (5) working days prior to the date of scheduled tree trimming. All tree and shrub trimming must have prior approval of the Engineer and shall be performed by a Contractor possessing a C-27 or a D-49 license. All costs for tree or shrub trimming and proper disposal shall be paid by the Contractor.

Tree clearance must be a minimum of 11 feet from the lip of gutter.

A special notice pertaining to the tree trimming shall be delivered to the adjacent home or business at least two working days before the tree is trimmed. The notice shall be reviewed and approved by the Engineer before delivery.

Landscaping Obstruction
In the event that there are landscaping obstructions such as ivy, lawn, juniper branches, grass, or other encroaching vegetation, the Contractor shall trim or prune such obstruction only to the extent necessary to conduct the installation of improvements in the public right-of-way. Landscaping or other improvements outside the limits of work shall be protected by the Contractor and shall be replaced in kind if the Contractor’s operations damage the existing

Page 137 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
80 improvements. If the Contractor fails to comply in providing the necessary replacement as defined, the Engineer may elect to have the Town or contract forces perform all these duties deducting all the expenses incurred from any moneys that are due, or to become due, to the Contractor. By exercising this option, the Contractor is in no way relieved of the responsibilities to perform these duties.

8.2. EXISTING FACILITIES
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications, and “Existing Facilities" of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #3 Adjust Sanitary Sewer Manhole to Grade Ea.

Bid Item #4 Adjust Storm Manhole to Grade Ea.

Bid Item #5 Adjust Survey Monument Cover to Grade Ea.

Bid Item #6 Adjust Water Valve Cover to Grade (Revocable) Ea.

Bid Item #7 Adjust Water Meter Box to Grade (Revocable) Ea.

Bid Item #8 Adjust Gas Valve to Grade Ea.

Bid Item #9 Adjust Sanitary Sewer Cleanout to Grade Ea.

Bid Item #10 Adjust Vault to Grade Ea.

Bid Item #11 Install New Monument Lid G5 Christy Box Ea.

Bid Item #A1.1 Adjust Sanitary Sewer Manhole to Grade Ea.

Bid Item #A1.2 Adjust Survey Monument Cover to Grade Ea.

Bid Item #A1.3 Adjust Water Valve Cover to Grade (Revocable) Ea.

Bid Item #A1.4 Install New Monument Lid G5 Christy Box Ea.

General
Existing Facilities shall conform to Section 15, “Existing Facilities,” of the Standard Specifications, the Plans, and these Contract Documents.

Protect Existing Facilities to Remain
The Contractor shall work around and protect all existing improvements to remain, including but not limited to existing utilities, monumentation, benchmarks, storm drainage facilities, utility vaults, traffic detector loops, home runs and

Page 138 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
81 handholes, concrete and hot mix asphalt pavement, pavement markings, landscaping, irrigation facilities, and appurtenances that are within or adjacent to the construction areas.

The Contractor shall notify Underground Service Alert (USA) prior to beginning any work. Notification shall be in full compliance with USA. At the conclusion of the project, the Contractor must remove all USA markings from all paved and concrete surfaces throughout the job site without damaging said surfaces. The method of removing the USA markings is at the Contractor’s discretion.

Existing utility lines are not shown on plans. The Contractor is responsible for locating and field verifying the locations of all existing utilities prior to all construction activities and protecting all facilities during construction. The Contractor shall protect existing electroliers when placing construction signs.

The Contractor shall immediately repair or remove and replace any item damaged or injured by his operations at his sole expense and to the satisfaction of the Engineer. The Contractor shall immediately notify the appropriate owner of the improvement or facility and the Engineer of any damage as a result of his operations to existing improvements or facilities. If the improvement belongs to a private residence and the property owner or occupant is not at home, such notification shall be attached to the front door of the property. Contractor must share an image of the notification attached to the door with the town. All underground facilities that are damaged by the Contractor during construction shall be restored by the Contractor within two (2) hours after the damage is done.

All existing improvements, including but not limited to, irrigation systems, brick work, stone work, concrete work, fences, mailboxes, turf and landscaping, on public right-of-way which are obstacles to forming operations may be removed as necessary for this type of work. The Contractor shall notify the adjacent property owner and the Engineer prior to removal of any existing improvements. After removing the forms, all the existing improvements shall be restored to their original condition at no additional cost to the Town. If the Contractor fails to comply in providing the necessary restoration work as defined, the Engineer may elect to have the Town or other contract forces perform all these duties, deducting all the expenses incurred from any moneys that are due, or to become due, to the Contractor.

By exercising this option, the Contractor is in no way relieved of the responsibilities to perform these duties.

Adjust Facilities to Grade
All existing manholes, traffic signal boxes, handholes, utility valve covers, utility frames, utility valve boxes, water meter boxes, cable boxes, vault covers, and monuments within the project limit of work area shall be adjusted to grade in accordance with Section 15, “Existing Facilities,” of the Standard Specifications, the Plans, and these Contract Documents. Where existing facilities to be adjusted are located in traffic areas, said facilities shall be modified to handle traffic loads and retrofitted with traffic covers. Exact locations of survey monuments, etc. shall be field verified by the Contractor at the start of construction and field verified by the Engineer prior to the start of work The Town shall be notified seven (7) working days prior to adjusting any facilities to grade. All work shall be done without any interruption to services provided by the facility.

Frames and covers shall be removed, transported, and stored without damage. Any items damaged shall be replaced at the Contractor's expense. Pre-existing damage must be brought to the Engineer’s attention prior to commencement of any work. All facilities shall be adjusted to grade within fourteen (14) working days after the final hot mix asphalt overlay has been placed on each street. The covers shall be raised by excavating the frame and cover in a neat concentric circle with a diameter not greater than necessary to loosen and adjust the frame with the cover and the concrete collar.

At the direction of the Engineer, the Contractor shall use quick set concrete for all collars. Class A concrete mix (590 pounds cement per cubic yard concrete) shall be used to fill the void to an elevation 1” to 1.5” below finish grade. After

Page 139 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
82 three (3) days of concrete set, a tack coat of undiluted SS1h asphalt emulsion shall be applied to all concrete and vertical surfaces. The hot mix asphalt (HMA) surface course to be applied shall be 1/2", Type A, compacted to a minimum of 95 percent. Asphalt binder shall be PG 64-10. Any facilities that are adjusted to grade, but are not to the satisfaction of the Engineer, shall be removed and re-adjusted within four (4) working days of being notified to do so by the Engineer. All required hot mix asphalt, tack coat and concrete required for raising facilities to grade shall be paid for under this contract item.

Monument boxes in work areas shall be raised or adjusted to the new grade without disturbing the existing monument, or the Contractor shall be responsible for obtaining services of a registered Surveyor to tie out the existing monument, remark, and reset the monument following the raising of the box. The Contractor shall be responsible for filing the appropriate Corner Records as necessary for relocation of the monument and shall provide a copy of all recorded documentation to the Town prior to project acceptance.

New monument boxes, including frames and covers shall be installed to grade around those monuments that do not have existing boxes. Any new monument boxes, frames, and covers needed shall be provided by the Town. All covers shall be stable under traffic.

The Contractor shall clean all concrete, HMA debris. and tack oil off of utility covers caused by the Contractor’s operation.

8.3. HOT MIX ASPHALT (HMA)
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work in compliance with the Plans, Specifications, and “Hot Mix Asphalt (HMA)” of the Technical Specifications, including but not limited to constructing HMA, complete in place, including surface preparation, tack coat, temporary transition, job mix formula preparation, shall be included and paid for in the appropriate bid item price.

Bid Item #12 2" Hot Mix Asphalt (HMA) Overlay Ton
Bid Item #13 4" Hot Mix Asphalt (HMA) Overlay Ton
Bid Item #14 Hot Mix Asphalt (HMA) Leveling Course Ton
Bid Item #A1.5 Hot Mix Asphalt (HMA) Leveling Course Ton General
Hot mix asphalt shall conform to Section 39, "Hot Mix Asphalt," of the Standard Specifications, the Plans, and these Technical Specifications. This work includes producing and placing hot mix asphalt (HMA) using the modified Standard Process and placing Minor Hot Mix Asphalt using the Method Process as indicated herein.

Generally, the hot mix asphalt to be used will be as follows unless modified by the Engineer, compacted to a minimum of 95%:

Leveling Courses: HMA Type A, 3/8-inch maximum

Page 140 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
83 Surface Courses, Dig Outs, and Speed
Humps:

HMA Type A, 1/2-inch maximum
The grade of asphalt binder mixed with aggregate for HMA Type A must be PG 64-10 and shall conform to Subsection 92-1.02(B), “Performance Grade Asphalt Binders,” of the Standard Specifications.

Construction
The work shall consist of preparing the existing street surfaces prior to the commencement of paving. Such work shall include removing controlling nuisance water, sweeping, watering, and removing loose and broken hot mix asphalt pavement and foreign material as specified in the Standard Specifications and these Contract Documents, and as directed by the Engineer.

Asphalt leveling course shall be spread to produce a uniform smoothness. The leveling course shall be compacted with an 8- to 10-ton rubber tire roller.

A tack coat of undiluted SS1H emulsified asphalt shall be placed on all exposed hot mix asphalt and concrete surfaces prior to placement of asphalt.

The Engineer may sample the hot mix asphalt from truck beds at the plant, from the hopper of the spreading machine, or from the completed mat at the discretion of the Engineer. The Contractor shall facilitate the sampling process.

The temperature of the hot mix asphalt prior to placement shall not be less than 260°F or at the discretion of the engineer.

The Contractor shall construct temporary pavement transitions at all transverse paving joints greater than 1 inch prior to allowing traffic onto the paved surface. Temporary pavement transitions shall have a maximum slope of 20:1 or as approved by the engineer and be constructed on Kraft paper or other suitable bond breaker such that upon removal of the temporary pavement transition, a clean notch remains. The temporary transitions may be constructed of either cold mix or hot mix.

The Contractor shall continuously maintain the temporary pavement until final paving. Each temporary transition shall be inspected by the Contractor and repaired as necessary to comply with these provisions at the end of each day including weekends and holidays.

Asphalt paving machines used for mainline overlay paving shall meet the following minimum criteria:
• Minimum Engine Power: 120 horsepower (HP)
• Minimum Operating Weight: 31,000 pounds (lbs.)
• Capable of Automatic Screed Control
The paving machine shall be capable of maintaining continuous forward travel and production placement without interruption due to insufficient power or weight.

The Contractor shall have hand-compaction equipment immediately available for compacting all areas inaccessible to rollers. Hand-compaction shall be performed concurrently with breakdown rolling. If for any reason hand-compaction falls behind breakdown rolling, further placement of hot mix asphalt shall be suspended until hand-compaction is caught

Page 141 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
84 up. Hand-compaction includes vibraplates and hand tampers. Hand torches shall be available for rework of areas which have cooled.

After compaction, the surface texture of all hand work areas shall match the surface texture of the machine placed mat.

Any coarse or segregated areas shall be corrected immediately upon discovery. Failure to immediately address these areas shall cause suspension of hot mix asphalt placement until the areas are satisfactorily addressed, unless otherwise allowed by the Engineer.

8.4. HOT MIX ASPHALT DIG OUT AND REPAIRS
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications and “Hot Mix Asphalt Dig out and Repairs” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #15 2" Depth Dig Outs S.F.

Bid Item #16 4" Depth Dig Outs S.F.

Bid Item #A1.6 2" Depth Dig Outs S.F.

Bid Item #A1.7 4" Depth Dig Outs S.F.

General
Hot mix asphalt (HMA) dig outs shall conform to Section 39, “Hot Mix Asphalt,” of the Standard Specifications, the Plans, and these Contract Documents. Attention is directed to “Hot Mix Asphalt (HMA)” of these Technical Specifications. The Contractor shall grind and replace the hot mix asphalt pavement to a depth of four (4) inches on residential streets or six (6) inches on arterial streets at locations marked in the field by the Engineer.

Existing roadway sections may contain road paving fabric. All costs associated with the grinding, removing, and disposing of HMA including those containing road paving fabric shall be borne by the Contractor.

The Contractor shall notify the Engineer a minimum of five (5) working days prior to any dig out repair work done within any signalized intersection, which would cause expected interference/interruption to the existing traffic signal system and/or traffic control.

Prior to beginning any work on the dig out and repairs, the Contractor shall arrange for and conduct a field review of the job and mark out the locations of each dig out with the Engineer. The Engineer and Contractor shall record the agreed upon dimensions for each dig out at each location. Size of the dig outs shall not vary from this agreement unless specified in writing by the Engineer. Additional compensation shall not be allowed for dig outs in excess of the agreed upon size.

The HMA in the dig outs shall be placed on the same day as the removal. The HMA shall be placed and compacted in at least two lifts unless shown otherwise allowed by the Engineer.

The contract price per square foot shall remain the same despite any increase or decrease in contract quantities.

Page 142 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
85 The existing section will be removed by grinding. Any additional expenses incurred due to the increase in the size of the dig out necessary to accommodate the size of grinder shall not be paid for by the Town, including the increased cost for the additional tonnage of asphalt necessary to fill the increased dig out area.

All dig outs shall be removed and replaced on the same day with a new full depth hot mix asphalt section. Upon removing the existing AC, all loose material shall be removed to a solid surface (95% compaction) or the Contractor shall compact the upper four inches (4") of the subgrade (or aggregate base) to not less than 95% relative compaction.

A tack coat of undiluted SS1H emulsified asphalt shall be placed on all exposed hot mix asphalt and concrete surfaces prior to placement of asphalt.

All excavations shall be backfilled with the final asphalt.

The Contractor shall provide a minimum of one self-propelled, vacuum sweeper to remain on-site at all times. The sweeper shall be used to keep the streets free from debris and hazards at the direction of the engineer. By the end of each working day, all streets shall be fully available to all types of traffic and free from hazards.

The Contractor shall be responsible for protecting all utility facilities and Town monuments located within the project area. The Contractor shall be responsible for repairing any damage to the utility facilities caused by the Contactor’s operations and shall be responsible for hiring a surveyor and filing the necessary paperwork for any Town monument that needs to be reset due to the Contractor’s work.

Pavement markers and thermoplastic markings that are removed and replaced as part of the dig outs are considered included in this item of work, therefore, no further compensation will be allowed.

8.5. WEDGE GRIND
Measurement and Payment
Full compensation for furnishing all labor, material, equipment, tools, and all other incidentals necessary to perform the full scope of work as described above, for removal, legal disposal or as specified herein and as directed by the Engineer, including temporary striping and delineation, tack coats and paint binders, and for performing all of the work involved in compliance with the Plans, Specifications, and “Wedge Grind,” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #17 6' Wedge Grind L.F.

Bid Item #18 18' Wedge Grind L.F.

Bid Item #A1.8 6' Wedge Grind L.F.

Bid Item #A1.9 18' Wedge Grind L.F.

General
Grinding shall conform to Section 42-3, “Grinding,” of the Standard Specifications, the Plans, and these Contract Documents. The Contractor shall furnish all necessary supervision, labor, materials, construction tools and equipment to complete asphalt removal and proper disposal at locations specified by the Engineer.

Page 143 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
86 Scope
Wedge grind shall consist of a longitudinal wedge cut of 1.5” by 4’ (minimum) along gutter lines. Wedge grind shall consist of a transverse wedge cut of 1.5" by 18' (minimum) along streets not to receive a new surface treatment. The locations to wedge grind include, but are not limited to, any which abut any permanent structures such as curbs, gutters, sidewalks, driveways, concrete slabs, and catch basins. Any sections of asphalt that becomes loose after grinding shall be removed and disposed of by the Contractor at the Contractor’s expense.

Pavement wedge grind shall not be allowed more than 48 hours prior to schedule overlay operations without written authorization from the Engineer.

Cold milling/wedge cutting machines shall be operated so as not to produce fumes or smoke. They shall be capable of planning/milling/wedge cutting the pavement without requiring the use of a heating device to soften the pavement during, or prior to, the cutting operation.

The Contractor shall be responsible for maintaining all wedge cuts, using cutback or other methods, to prevent tire and suspension damage to vehicles and to prevent hazards to bicyclists and pedestrians.

Wedge cutting at corners, returns and hard to get areas shall be done with special grinding equipment capable of grinding such areas. Wedge cutting or grinding may encounter existing paving fabric on previously overlaid streets. No additional payment will be made for this condition and the Contractor shall dispose of the fabric at no additional cost.

The same method shall be used on all structures that area left above the traveled asphalt surface.

Asphalt wedge grind shall be measured by lineal feet and as marked in the field by the Engineer. No payment shall be made for materials removed outside of the limits marked by the Engineer.

8.6. ASPHALT REMOVAL
Measurement and Payment
Full compensation for furnishing all labor, materials, equipment and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Asphalt Removal" of the Technical Specifications, including but not limited to removal, legal disposal, temporary striping and delineation, tack coats, and paint binders, shall be included and paid for in the appropriate bid item price.

Bid Item #19 Asphalt Removal-2" Depth S.Y.

Bid Item #20 Asphalt Removal-4" Depth S.Y.

General
The Contractor shall furnish all necessary supervision, labor, materials, construction tools and equipment, supplies to complete asphalt removal, fabric/petromat, and proper disposal at locations marked by the Engineer. The Contractor to cold plane and remove asphalt to a depth as indicated on the Plans. No payment shall be made for materials removed outside of the limits marked by the Engineer. Existing pavement surface on roadways to be milled prior to pavement inlay shall be cold planed as specified herein. The Contractor shall be responsible for maintaining all cold planing cuts, using cutback or other methods, to prevent tire and suspension damage to vehicles and to prevent hazards to bicyclists and pedestrians.

Page 144 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
87 Equipment
The machine used for planing shall have performed satisfactorily on similar work and shall meet the following requirements.

The planing machine shall be specifically designed and built for the planing of bituminous pavements without the addition of heat. It shall have the ability to plane Portland cement concrete patches in the bituminous pavement. The cutting drum shall be a minimum of sixty inches wide and shall be equipped with carbide tipped cutting teeth placed in a variable lacing pattern to produce the desired finish.

The machine shall be capable of being operated at speeds of zero to forty feet per minute, it shall be self-propelled, and have the capability of spraying water at the cutting drum to minimize dust. The machine shall be operated in such a way so that no fumes or smoke will be produced. The machine shall be capable of removing the paving material next to curbs or gutters and be designed such that the operator thereof can at all times observe the planing operation without leaving the controls. The machine shall be adjustable for slope and depth and shall be equipped with sonic sensing devices for controlling depth.

Construction
The limits of cold planing will be determined by the Engineer prior to construction. Cold planing may require removal of existing asphalt pavement above gutter lips, in addition to the required depth below the gutter lip, due to prior overlays.

Pavement to be cold planed may contain pavement fabric. No additional payment will be made for these conditions and the Contractor shall dispose of the additional asphalt and/or fabric at no additional cost. Cold planing shall not be allowed more than 48 hours prior to the scheduled overlay operations without written authorization from the Engineer.

The Contractor shall obtain a water meter from San Jose Water prior to drawing water from any hydrant.

8.7. Asphalt Crack Sealing
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, flaggers, equipment, and all incidentals, and for doing all of the work in compliance with the plans, specifications and “Asphalt Crack Sealing” of the Technical Specifications shall be included and paid for in the lump sum (L.S.) price for:

Bid Item #21 Crack Sealing L.S.

General
Prior to any crack seal/fill, any cracks (including less than 1/4") within project limits shall be cleaned of dirt and vegetation. Prior to any types of pavement treatment or resurfacing, the Contractor shall crack seal/fill all cracks that are 1/4" wide or larger for slurry seal streets, cracks that are 1/2” or larger for rubber cape seal streets, and cracks that are 1/8” or larger for crack sealing only streets. The crack filler material shall be produced from an asphaltic base crude and granulated crude rubber. It shall not have been distilled at a temperature high enough to inquire by burning. The material shall meet any applicable rules and regulations of the Bay Area Quality Management District.

Materials, plants, vegetation, etc. shall be removed from all cracks prior to placement of the filler. The crack filler shall be a mixture of paving asphalt and ground rubber or ground rubber and polymer which conforms to the following requirements:

Page 145 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
88 Softening Point, ASTM Designation: D36 180°F minimum Cone Penetration at 77°F, ASTM Designation: D5329 30 dmm minimum Resilience at 77°F, ASTM Designation: D5329 40% minimum Flow, ASTM Designation: D5329 3 mm maximum

The gradation of the ground rubber shall be such that 100% will pass a No. 8 sieve.

The modified asphalt materials shall be furnished premixed in containers with an insider liner of polyethylene. Packaged material shall not exceed 60 lbs. in weight. Storage and heating instructions and cautions shall be supplied by the vendor with each shipment. The material shall be capable of being melted and applied to the cracks and joints at temperatures below 400°F. When heated, it shall readily penetrate cracks 1/4" wide or larger.

The vendor for the crack seal shall furnish a certificate that the material complies with the above requirements. A certificate of compliance conforming to Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications shall be supplied with each shipment. Crack filling shall take place after the asphalt dig out repairs and grinding work are completed. Crack filler should be left 1/8” to 1/4" below top of crack.

8.8. ASPHALT RUBBER CAPE SEAL, MICRO SURFACING, AND SLURRY SEAL Measurement and Payment
Full compensation for furnishing all labor, materials, equipment, and incidentals and for doing all the work in compliance with the Plans, Specifications, and “Asphalt Rubber Cape Seal, Micro Surfacing, and Slurry Seal” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #22 Asphalt Rubber Cape Seal S.Y.

Bid Item #23 Micro Surfacing (Black Aggregate) S.Y.

Bid Item #A1.10 Asphalt Rubber Cape Seal S.Y.

General
Asphalt rubber cape seal, rubber chip seal, micro surfacing, or slurry seal shall be installed in all designated locations as shown in Appendix A. Asphalt rubber cape seal is defined as the application of an asphalt rubber chip seal followed by the application of a Type II slurry seal or micro surfacing.

ASPHALT RUBBER CHIP SEAL
General
The following sections of this specification describe the preparation, materials application and finishing requirements for the asphalt rubber seal coat (asphalt rubber chip seal).

Page 146 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
89 Asphalt rubber seal coat shall consist of an application of asphalt rubber binder and screenings pre-coated with paving asphalt. Asphalt rubber seal coat shall conform to the provisions specified for seal coats in Section 37-2, “Seal Coats,” of the Standard Specifications and these Special Provisions.

Materials
The Contractor shall furnish a Certificate of Compliance to the Engineer for each material used in the asphalt rubber binder mixture. It shall certify that the material conforms to the requirements in the Special Provisions. When requested by the Engineer, the Contractor shall also submit samples with the Certificate of Compliance. The Contractor shall provide the Engineer a Material Safety Data Sheet (MSDS) for each of the constituent components of the asphalt rubber binder and for the completed mixture of the asphalt rubber binder.

The Contractor shall provide a Certificate of Compliance for each truck load of crumb rubber modifier (CRM), paving asphalt, and asphalt modifier delivered to the project. The Quality Control Program used by the manufacturer of each ingredient shall include a sampling and testing frequency as shown below:
a. CRM shall be tested except for the grading requirement, at least once for every 250 tons with a minimum of once per project. CRM shall be tested for grading for every truck load delivered to the project. b. Paving Asphalt shall be tested at least once for every 200 tons of production with a minimum of once per project. c. Asphalt modifier shall be tested at least once for every 25 tons of production with a minimum of once per project. d. A copy of the laboratory test results for the test parameters specified in these special provisions for CRM, paving asphalt, and asphalt modifier shall be submitted to the Engineer with the Certificate of Compliance for each truck load of individual material delivered to the project.

Certified volume or weight slips shall be delivered to the Engineer for materials supplied.

Paving Asphalt
Paving asphalt to be used in the asphalt rubber binder shall be Grade PG 64-16 and shall conform to the provisions in Section 92, “Asphalts,” of the Standard Specifications reflecting the use of ‘Performance Grade (PG)’ asphalt binders.

The paving asphalt for use in asphalt rubber binder shall be modified with an asphalt modifier. The rubberized asphalt concrete (RAC) chip material shall be made from 100% recycled California Waste Tires.

Asphalt Modifier
The asphalt modifier shall be a resinous, high flash point, aromatic hydrocarbon compound and shall conform to the following requirements:

Asphalt Modifier
Test Parameter ASTM Designation Requirement
Viscosity, m2/s (10-6) at 100°C D 445 X ±3*
Flash Point, CL.O.C. °C D 92 405 min.

Molecular Analysis
Asphaltenes, percent by mass D 2007 0.1 max.

Page 147 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
90 Aromatics, percent by mass D 2007 55 min.
* The symbol "X" is the viscosity of the asphalt modifier the Contractor proposes to furnish. The value "X" which the Contractor proposes shall be between the limits 19 and 36 and shall be submitted in writing to the Engineer. Any proposed change, requested by the Contractor, in the value "X" shall require a new asphalt rubber binder design.

The asphalt modifier shall be proportionately added to the paving asphalt at the production site where the asphalt rubber binder is blended and reacted. Asphalt modifier shall be added at an amount of 2.5 percent to 6.0 percent by weight of the paving asphalt based on the recommendation of the asphalt rubber binder supplier. The paving asphalt shall be at a temperature of not less than 375°F no more than 440°F when the asphalt modifier is added. If the asphalt modifier is combined with the paving asphalt, before being blended with the CRM, the combined paving asphalt and asphalt modifier shall be mixed by circulation for a period of not less than 20 minutes. This premixing of asphalt modifier and paving asphalt will not be required when all ingredients of the asphalt rubber binder are proportioning with the meters conforming to the provisions in Section 9-1.02, “Measurement,” of the Standard Specifications.

Crumb Rubber Modifier (CRM)
Crumb rubber modifier (CRM) shall consist of a combination of scrap tire CRM and high natural CRM. The scrap tire CRM shall consist of ground or granulated rubber derived from any combination of automobile tires, truck tries or tire bufferings. The high natural CRM shall consist of ground or granulated rubber derived from materials that utilize high natural rubber sources.

Steel and fiber separation shall be accomplished by any method. Cryogenic separation, if utilized, shall be performed separately from and prior to grinding or granulating.

CRM shall be ground or granulated at ambient temperature. Cryogenically produced CRM particles that pass through the grinder or granulator without being ground or granulated, respectively, shall not be used.

CRM shall not contain more than 0.01-percent wire (by weight of CRM) and shall be free of other contaminants, except fabric. Fabric shall not exceed 0.05-percent by weight of CRM. A certificate of compliance certifying these percentages shall be furnished to the Engineer in conformance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications.

The length of an individual CRM particle shall not exceed 3/16 inch.

The CRM shall be sufficiently dry so that the CRM will be free flowing and will not produce foaming when combined with the blended paving asphalt and asphalt modifier mixture. Calcium carbonate or talc may be added at a maximum amount of 3 percent by weight of CRM to prevent CRM particles from sticking together. The CRM shall have a specific gravity of between 1.1 and 1.2 as determined by California Test 208. Scrap tire CRM and high natural CRM shall be delivered to the production site in separate bags and shall be sampled and tested separately.

CRM Material shall conform to the following requirements as determined by ASTM Designation D297:

Scrap Tire CRM High Natural CRM
Percent Percent

Page 148 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
91 Test Parameter Minimum Maximum Minimum Maximum
Acetone Extract 6.0 16.0 4.0 16.0
Rubber Hydrocarbon 42.0 65.0 50.0 —
Natural Rubber content 22.0 39.0 40.0 48.0
Carbon Black Content 28.0 38.0 — —
Ash Content — 8.0 — —

The CRM for asphalt rubber binder shall conform to the gradations specified below when tested in conformance with the requirements in ASTM Designation C136, except as follows:
a. Split or quarter 100 g +/- 5 g from the CRM sample and dry to a constant mass at a temperature of not less than 57°C nor more than 63°C and record the dry sample mass. Place the CRM sample and 5 g of talc in a 0.5-L jar. Seal the jar then shake the jar by hand for a minimum of one minute to mix the CRM and the talc. Continue shaking or open the jar and stir until particle agglomerates and clumps are broken and the talc is uniformly mixed. b. Place one rubber ball on each sieve. Each ball shall have a mass of 8.5 g +/- 0.5 g, have a diameter of 24.5 mm +/- 0.5 mm, and shall have a Shore Durometer “A” hardness of 50 +/- 5 in conformance with the requirements in ASTM D2240.

After sieving the combined material for 10 minutes +/- 1 minute, disassemble the sieves. Material adhering to the bottom of a sieve shall be brushed into the next finer sieve. Weigh and record the mass of the material retained on the

2.36-mm sieve and leave this material (do not discard) on the scale or balance. Observed fabric balls shall remain on the scale or balance and shall be placed together on the side of the scale or balance to prevent the fabric balls from being covered or disturbed when placing the material from finer sieves onto the scale or balance. The material retained on the next finer sieve (2.00-mm sieve) shall be added to the scale or balance. Weigh and record that mass as the accumulative mass retained on that sieve (2.00-mm sieve). Continue weighing and recording the accumulated masses retained on the remaining sieves until the accumulated mass retained in the pan has been determined. Prior to discarding the CRM sample, separately weigh and record the total mass of fabric balls in the sample. c. Determine the mass of material passing the 75-µm sieve (or mass retained in the pan) by subtracting the accumulated mass retained on the 75-µm sieve from the accumulated mass retained in the pan. If the material passing the 75-µm sieve (or mass retained in the pan) has a mass of 5 g or less, cross out the recorded number for the accumulated mass retained in the pan and copy the number recorded for the accumulated mass retained on the 75-µm sieve and record that number (next to the crossed out number) as the accumulated mass retained in the pan. If the material passing the 75-µm sieve (or mass retained in the pan) has a mass greater than 5 g, cross out the recorded number for the accumulated mass retained in the pan, subtract 5 g from that number and record the difference next to the crossed out number. The adjustment to the accumulated mass retained in the pan is made to account for the 5 g of talc added to the sample. For calculation purposes, the adjusted total sample mass is the same as the adjusted accumulated mass retained in the pan. Determine the percent passing based on the adjusted total sample mass and record to the nearest 0.1 percent:

CRM Gradations

Page 149 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
92 Sieve Sizes Scrap Tire CRM
Percent Passing
High Natural CRM
Percent Passing
No. 8 100 100
No. 10 98 - 100 100
No. 16 45 - 75 95 - 100
No. 30 2 - 20 35 - 85
No. 50 0 - 6 10 - 30
No. 100 0 - 2 0 - 4
No. 200 0 0 - 1
Asphalt Rubber Binder
Asphalt rubber binder shall consist of a mixture of paving asphalt, asphalt modifier, and crumb rubber modifier.

At least 2 weeks before its intended use, the Contractor shall furnish the Engineer four, one-quart cans filled with the asphalt rubber binder proposed for use on the project. The Contractor shall supply the Engineer, for approval, a binder formulation, design profile and samples of all materials to be used in the asphalt rubber binder, at least 2 weeks before construction is scheduled to begin. The binder formulations shall consist of the following information:

A. Paving Asphalt and Modifiers:

1. Source and grade of paving asphalt

2. Source and identification (or type) of modifiers used

3. Percentage of asphalt modifier by weight of paving asphalt

4. Percentage of the combined blend of paving asphalt and asphalt modifier by total weight of asphalt rubber binder to be used

5. Laboratory test results for test parameters shown in these Special Provisions B. Crumb Rubber Modifier (CRM):

1. Source and identification (or type) of scrap tire and high natural CRM

2. Percentage of scrap tire and high natural CRM by total weight of the asphalt rubber blend

3. If CRM from more than one source is used, the above information will be required for each CRM source used

4. Laboratory test results for test parameters shown in these Special Provisions C. Asphalt Rubber Binder:

1. Laboratory test results of the proposed blend for test parameters shown in these Special Provisions

Page 150 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
93 2. The minimum reaction time and temperature
The method and equipment for combining the paving asphalt, asphalt modifier, and CRM shall be so designated and accessible that the Engineer can readily determine the percentages by weight for each material being incorporated into the mixture.

The proportions of the materials, by total weight of asphalt rubber binder, shall be 80 percent +/- 2 percent combined paving asphalt and asphalt modifier and 20 percent +/- 2 percent CRM. However, the minimum amount of CRM shall not be less than 18.0 percent. Lower values shall not be rounded up. The CRM shall be combined at the production site and shall contain 75 percent +/- 2 percent scrap tire CRM and 25 percent +/- 2 percent high natural CRM, by weight.

The paving asphalt and asphalt modifier shall be combined into a blended mixture that is chemically compatible with the crumb rubber modifier to be used. The blended mixture shall be considered to be chemically compatible when the mixture meets the requirements for asphalt rubber binder (after reacting) found in these Special Provisions.

The blended paving asphalt and asphalt modifier mixture and the CRM shall be combined and mixed together at the production site in a blender unit to produce a homogeneous mixture.

The temperature of the blended paving asphalt and asphalt modifier mixture shall not be less that 375°F nor more than 440°F when the CRM is added. The combined materials shall be reacted for a minimum of 45 minutes after incorporation of the CRM at a temperature of not less than 375°F nor more than 425°F. The temperature shall not be higher than 10°F below the actual flash point of the asphalt rubber binder.

After reacting, the blended asphalt rubber binder shall conform to the following requirements:

Blended Asphalt Rubber Binder
Requirement
Test Parameter ASTM Test Method Minimum Maximum
Cone Penetration @ 25°C, 1/10 mm D 217 25 60
Resilience @ 25°C, Percent rebound D 5329 25 --
Field Softening Point, °C D 36 55 88
Viscosity @190°C, Pa • s (x10-3) See Note 1500 3500
Note:

The viscosity test shall be conducted using a hand held Haake Viscometer Model VT 02 with Rotor 1, 24 mm depth x 53 mm height, or equivalent, as determined by the Engineer. The accuracy of the viscometer shall be verified by comparing the viscosity results obtained with the hand held viscometer to 3 separate calibration fluids of known viscosities ranging from 1000 to 5000 Pa • s (x10 3). The viscometer will be considered accurate if the values obtained are within 300 Pa • s (x10 3) of the known viscosity. The known viscosity value shall be based on the fluid manufacturer's standard test temperature or the test temperature versus viscosity correlation table provided by the fluid manufacturer. All viscometers used on the project shall be verified to be accurate. The test method for determining the viscosity of asphalt rubber binder using a hand held viscometer is available at the Transportation Laboratory, Office of Pavement Consulting Services, Sacramento, California, Telephone (916) 227 7300. The accuracy verification results shall be provided to the

Page 151 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
94 Engineer and shall be certified by a Certificate of Compliance. The Certificate of Compliance shall be furnished to the Engineer in conformance with the provisions in Section 6 3.05E, "Certificates of Compliance," of the Standard Specifications.

The Contractor shall provide a Haake Viscometer, or equivalent, at the production site during the combining of asphalt rubber binder materials. The Contractor shall take viscosity readings of asphalt rubber binder from samples taken from the distributor truck a minimum of 45 minutes after incorporation of the CRM. Readings shall be taken at least every hour with no less than one reading for each batch of asphalt rubber binder. The Contractor shall log these results, including time and asphalt rubber temperature. A copy of the log shall be submitted to the Engineer on a daily basis. As determined by the Engineer, the Contractor shall either notify the Engineer at least 15 minutes prior to each test or provide the Engineer a schedule of testing times.

The reacted asphalt rubber binder shall be maintained at a temperature of not less than 375°F nor more than 425°F.

If any of the material in a batch of asphalt rubber binder is not used within 4 hours after the 45 minute reaction period, heating of the material shall be discontinued. If the asphalt rubber binder cools below 375°F and is then reheated, it shall be considered a reheat cycle. The total number of reheat cycles shall not exceed 2. The material shall be uniformly reheated to a temperature of not less than 375°F nor more than 425°F prior to use. Additional scrap tire CRM may be added to the reheated binder and reacted for a minimum of 45 minutes. The cumulative amount of additional scrap tire CRM shall not exceed 10 percent of the total binder weight. Reheated asphalt rubber binder shall conform to the requirements for blended asphalt rubber binder.

Screenings
Screenings shall conform to the provisions in these Special Provisions and in Section 37-2.02, “Materials,” of the Standard Specifications, except that Section 37-2.02H(1) and 37-2.02H(2) shall not apply.

Stockpiling of screenings after preheating and pre-coating with paving asphalt will not be permitted.

Canvas or similar covers that completely cover each load of pre-coated screenings shall be used during hauling to minimize temperature drop of the pre-coated screenings.

Screenings shall conform to the following grading requirements prior to pre-coating with paving asphalt:

Screenings Grading Requirements
1/2-inch Course Maximum
Sieve Sizes Percentage Passing
3/4" 100
1/2" 95-100
3/8" 70-85
No. 4 0 – 15
No. 8 0 - 5
No. 200 0 - 1

Page 152 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
95 Screenings shall conform to the following quality requirements immediately prior to preheating:

Screenings Quality Requirements
Test Parameters California Test Requirements
Los Angeles Rattler Loss (100 Revolutions) 211 10 Max.

Los Angeles Rattler Loss (500 Revolutions) 211 40 Max.

Film Stripping 302 25 Max.

Cleanness Value 227 80 Min.

Durability 229 52 Min.

Screenings for asphalt rubber seal coat shall be preheated to between 260°F and 325°F and uniformly coated at a rate of

0.7 percent to 1 percent by weight of dry aggregate with Grade PG-64-10 asphalt, conforming to the provisions in Section 92, “Asphalts,” of the Standard Specifications reflecting the use of ‘Performance Grade (PG)’ asphalt binders.

This reference to the Standard Specifications is for asphalt only and not for any other work.

Screenings shall be coated at a central mixing asphalt concrete plant that has been approved in conformance with the requirements in California Test 109. The exact rate will be determined by the Engineer upon a visual inspection of the first initial load delivered and thereafter as deemed necessary.

Equipment
The Contractor shall utilize the following equipment for asphalt rubber seal coat operations:

A. Self-propelled power brooms that clean the existing pavement and remove loose screenings without dislodging screenings set in the asphalt rubber binder. Gutter brooms or steel-tinned brooms shall not be used.

B. Pneumatic tired rollers conforming to the provisions in Section 39-3.03, “Spreading and Compacting Equipment,” of the Standard Specifications, except that the rollers shall have an air pressure of 100 pounds per square inch and maintained so that the air pressure will not vary more than +/- 5 pounds per square inch in each tire. A sufficient number of rollers shall be used so that one complete coverage will be provided in one pass.

C. A self-propelled screenings spreader, equipped with a screenings hopper in the rear, belt conveyors to carry the screenings to the front, and a spreading hopper equipped with full width distribution auger and spread roll. The screenings spreader shall be capable of providing a uniform screening spread rate over the entire width of the traffic lane in one application.

D. An asphalt heating tank equipped to heat and maintain the blended paving asphalt and asphalt modifier mixture at the necessary temperature before blending with the CRM. This unit shall be equipped with a thermostatic heat control device and a temperature reading device and shall be accurate to within +/- 5° F and shall be of the recording type.

E. A mechanical mixer for the complete, homogeneous blending of paving asphalt, asphalt modifier, and CRM.

Paving asphalt and asphalt modifier shall be introduced into the mixer through meters conforming to the

Page 153 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
96 provisions in Section 9-1.02, “Measurement,” of the Standard Specifications. The blending system shall vary the rate of delivery of paving asphalt and asphalt modifier proportionate with the delivery of CRM. During the proportioning and blending of the liquid ingredients, the temperature of paving asphalt and the asphalt modifier shall not vary more than +/- 25° F. The paving asphalt feed, the asphalt modifier feed, and the CRM feed shall be equipped with devices by which the rate of feed can be determined during the proportioning operation. Meters used for proportioning individual ingredients shall be equipped with rate-of-flow indicators to show the rates of delivery and resettable totalizers so that the total amounts of liquid ingredients introduced into the mixture can be determined. The liquid and dry ingredients shall be fed directly into the mixer at a uniform and controlled rate. The rate of feed to the mixer shall not exceed that which will permit complete mixing of the materials.

Dead areas in the mixer, in which the material does not move or is not sufficiently agitated, shall be corrected by a reduction in the volume of material or by other adjustments. Mixing shall continue until a homogeneous mixture of uniformly distributed and properly blended asphalt rubber binder of unchanging appearance and consistency is produced. The Contractor shall provide a safe sampling device that delivers a representative sample of the completed asphalt rubber binder of sufficient size to permit the required tests.

F. An asphalt rubber binder storage tank equipped with a heating system to maintain the proper temperature of the asphalt rubber binder and an internal mixing unity that maintains a homogeneous mixture of blended paving asphalt, asphalt modifier, and CRM.

G. A self-propelled truck or trailer mounted distributor, equipped with an internal mixing unit that maintains a homogeneous mixture of blended paving asphalt, asphalt modifier and CRM. The distributor shall have a pump or pumps that sprays asphalt rubber binder within +/-0.05 gallons per square yard of the specified rate. The distributor shall have a fully circulating spray bar that applies the asphalt rubber binder without a streaked or otherwise irregular pattern. The distributor shall be equipped with a tachometer, pressure gages, volume measuring devices and thermometer. The distributor shall have a platform on the rear of the vehicle and an observer shall accompany the distributor. The observer shall ride in such a position that all spray nozzles are in full view and readily accessible for unplugging plugged nozzles, should plugging occur.

H. Tailgate discharge trucks for hauling screenings shall be equipped with a device to lock onto the hitch at the rear of the screenings spreader. Haul trucks shall be compatible with the screenings spreader so that the dump bed will not push down on the spreader when fully raised or have too short a bed which results in screenings spilling while dumping into the receiving hopper.

All equipment shall be approved by the Engineer prior to use.

Preparation
The Contractor shall perform the necessary crack sealing of each street prior to the Contractor performing the necessary pavement dig out repairs and application of the chip seal or as directed by the Engineer. The Contractor shall be responsible for preparation of the pavement to receive seal coat required under Section 37-2.03D, “Surface Preparation,” of the Standard Specifications. Prior to placing chip seal coat, the streets shall be cleaned by sweeping with self-propelled vacuum or regenerative air sweepers with water spray bars to reduce dust. Sidewinder sweepers or brooms that wind row material and do not remove it shall not be used. Completion of sweeping shall be evidenced by the absence of all loose particles of paving, all dirt and all other extraneous material. If needed, all areas shall be swept a second time or more if necessary in the same manner as the first sweeping or as directed by the Engineer.

Page 154 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
97 Applying Asphalt Rubber Binder
Asphalt rubber binder shall be applied in conformance with these Special Provisions and with the provisions for applying asphaltic emulsion in Section 37-2.03F, “Applying Emulsion,” of the Standard Specifications, except as noted below and shall apply.

Asphalt rubber binder for asphalt rubber seal coat shall be applied at a rate of 0.55 gallon to 0.65 gallon per square yard.

The exact rate will be determined by the Engineer.

Asphalt rubber binder shall be placed upon a clean, dry surface. The pavement surface temperature shall be a minimum of 60°F where asphalt rubber binder is to be applied. The atmospheric temperature shall be a minimum of 60°F and a maximum of 109°F.

Distributor bar height, distribution speed, and shielding materials shall be utilized to reduce the effects of wind upon spray distribution as directed by the Engineer. The Engineer will delay or reschedule work when high, gusting or dusty winds prevent or adversely affect binder or screening application operations. Necessary equipment shall be in position and ready to commence placement operations before starting.

The Contractor shall comply with Federal, State, and Local environmental laws, rules, regulations, and ordinances including, but not limited to, air quality requirements.

The asphalt rubber binder shall be applied to the roadway immediately following mixing and reacting and shall be applied at a temperature not less than 385°F nor more than 415°F. Asphalt rubber binder application shall not be in excess of that which can be covered with screenings within two (2) minutes.

When placing asphalt rubber seal coat at intersections, left turn lanes, gore points, and other irregular areas, asphalt rubber application shall not be in excess of that which can be covered with screenings within fifteen (15) minutes.

When joining edges against areas with screenings, the joint shall be swept clean of excess screenings prior to the adjacent application of asphalt rubber binder. Transverse joints of this type shall be constructed by placing roofing paper across and over the end of the previous asphalt rubber seal coat applications. Once the spraying has progressed beyond the paper, the paper shall be removed immediately.

The longitudinal joint between adjacent applications of screenings shall coincide with the line between designated traffic lanes. Longitudinal joints shall be overlapped for complete overage. The overlap shall not exceed 4 inches.

At longitudinal joints with screenings, the edge shall be broomed back and blended to eliminate differences in elevation.

The joints shall be free from ridges and depressions and shall have a uniform appearance consistent with the adjacent sealed surface. Defects shall be corrected at the Contractor’s expense.

Joints between areas of asphalt rubber binder without screenings shall be made by overlapping asphalt rubber binder distributions. The excess material shall be properly dispersed by spreading with a squeegee or rake over a larger area of freshly applied asphalt rubber binder.

The application of asphalt rubber binder to areas not accessible with the distributor bar on the distributor torch shall be accomplished by using pressurized hand wands or other means approved by the Engineer.

Spreading Screenings
Screenings for asphalt rubber seal coat shall be spread in conformance with the provisions specified for spreading screenings on asphaltic emulsion in these Special Provisions and in Section 37-2.03G, “Spreading Screenings,” of the Standard Specifications, except as noted below and shall apply.

Page 155 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
98 Following the application of the asphalt rubber binder, screenings shall be placed over areas receiving asphalt rubber binder.

Screenings for asphalt rubber seal coat shall be applied at a temperature not less than 225°F and not more than 325°F after applying asphalt rubber binder.

The Contractor shall prevent any vehicle, including construction equipment, from driving on the asphalt rubber binder prior to application of the screenings.

Screenings shall be applied at a rate of 25 pounds to 35 pounds per square yard. The exact rate will be determined by the Engineer. The completed spread rate shall be within 10 percent of the rate determined by the Engineer. The completed surface shall be free of gaps, ridges, depressions or other irregularities caused by the application of the asphalt rubber seal coat.

Finishing
Asphalt rubber seal coat shall be finished in conformance with the provisions for finishing screenings spread on asphaltic emulsion in these Special Provisions and in Section 37-2.03H, “Finishing,” of the Standard Specifications, except as noted below and shall apply.

Initial rolling of the asphalt rubber seal coat shall consist of a minimum of one complete coverage with one or more pneumatic-tired rollers and shall begin within 90 seconds following the placement of the screenings. Chip spreading will not be allowed with less than two (20) operating rollers on the job.

The distance between the rollers and the screenings spreader shall not exceed 200 feet at any time during the spreading of the screenings operations.

A minimum of 3 complete coverages as defined in Section 39-3.04, “Transporting, Spreading, and Compacting,” of the Standard Specifications with pneumatic-tired rollers, after the initial coverage, shall be made on the asphalt rubber seal coat. When permitted by the Engineer, the final roller coverage may be made with one steel wheel roller weighing 8 tons minimum and 10 tons maximum. If a steel wheel roller is used, the roller shall be operated in the static mode only.

The Contractor shall immediately remove any excess asphalt rubber from the gutters. The Contractor shall not continue to the next street until all excess asphalt rubber is removed to the satisfaction of the Engineer. No extension of time will be granted due to delay caused by non-compliance with this provision.

Sweeping shall be a multi-step operation following final rolling of the screenings. Loose screenings shall be removed from the roadway surface and abutting adjacent areas. Loose screenings shall be disposed of at least 150 feet from the nearest waterway.

Initial sweeping shall be completed before controlled traffic is permitted on the asphalt rubber seal coat. Removal of excess screenings shall be completed before uncontrolled traffic is permitted on the completed asphalt rubber seal coat.

Final sweeping shall be done and loose screenings shall be removed without dislodging the screenings set in the asphalt rubber binder prior to acceptance.

Sidewinder sweepers or brooms that wind row material and do not remove it shall not be used. A minimum of two (2) sweepers shall be used at all times. All areas shall be swept a second time or more if necessary in the same manner as the first sweeping or as directed by the Engineer. Completion of sweeping shall be evidenced by the absence of loose chips in gutters or driveways. Special attention shall be required in sweeping driveways clear of loose chips. The Contractor shall also be responsible for removal of all chips from the sidewalks and other affected areas. Streets in hill

Page 156 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
99 areas shall be swept as often as necessary to remove loose chips from the roadway. The Contractor shall provide a sufficient number of sweepers (minimum two) to sweep all streets within 24 hours after spreading screenings (chips).

The use of any sweeper that causes damage to the chip seal coat shall be discontinued. The Contractor shall patch the chip seal where any voids exist prior to application of the fog, slurry, or micro seal. Any void caused by automobile tires, poor adhesion of chips to emulsion, or any other cause shall be the Contractor’s responsibility to patch prior to application of the fog or slurry seal.

Final Sweeping
A minimum of three (3) self-propelled power brooms shall be used that are capable of cleaning the existing pavement and removing loose screenings without dislodging screenings set in the asphalt rubber mixture. Gutter brooms or steeltined brooms shall not be used.

Sweeping of the chip seal shall commence one hour after completion of the rolling operation or as directed by the Engineer. Sweeping shall be completed prior to allowing uncontrolled traffic on the road surface. Three (3) additional sweepings shall be performed one day, three days, and seven days after placement of the chip seal to remove all loose screenings. The Contractor shall spray water on these subsequent sweepings for dust removal. Excess screenings shall be salvaged and stockpiled at a designated location or removed from the job site by the Contractor.

On the day of the actual chip seal operations, three power sweepers shall be used on those streets being chip sealed that day. Two sweepers shall be used to remove excess screenings from the road surface, and one sweeper shall directly follow the chip seal operations and be used to clean the surrounding streets and road surfaces outside of the project area to avoid tracking loose material. During sweeping the day of the chip seal, water shall not be used in the removal of loose material.

POLYMER MODIFIED SLURRY SEAL (BLACK AGGREGATE)
General
The slurry seal shall consist of a mixture of a polymer modified asphalt emulsion, mineral aggregate, mineral filler, water, and specified additives. The materials shall be proportioned, mixed and uniformly spread over a properly prepared surface as directed by these Special Provisions and the Engineer. The slurry seal shall conform to the requirements of Section 37-3, “Slurry Seal and Micro-surfacing,” of the Standard Specifications and these Special Provisions. The completed slurry seal shall leave a homogeneous mat and adhere firmly to the prepared surface.

The terminology “latex-modified” and “polymer-modified” asphaltic emulsion is to be used interchangeably in these Special Provisions to mean the same thing.

Asphaltic Emulsion
Asphaltic Emulsion used for slurry seal shall be designated as grade PMCQS-1h or equal.

The polymer used to modify the asphaltic emulsion, shall be, at the option of the Contractor, neoprene, or a co-polymer of butadiene and styrene. Solid polymers shall be adequately blended into the asphalt prior to emulsification. If a liquid latex such as neoprene or similar is used, the latex shall be “co-milled” into the emulsion through the water phase during manufacturing.

Each load of polymer modified asphaltic emulsion shall have a certificate from the asphalt emulsion manufacturer guaranteeing that either asphalt blending or “co-milling” processes were used. The certificate shall also state the

Page 157 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
100
percentage of the solid rubber polymer added by weight of the asphalt as well as the composition of the polymer. The addition of latex to the emulsion after emulsion manufacturing is prohibited.

The polymer modified asphalt emulsion shall conform to the following specifications:

Tests on Emulsion
Test Test Method Requirement
Minimum Maximum
Viscosity SSF, @ 77°F, seconds AASHTO T59 15 90
Sieve Test, % AASHTO T539 --- 0.30
Storage Stability Test, 1 day % AASHTO T59 --- 1.0
Residue by Evaporation, % CTM 331 57 ---
Particle Charge AASHTO T59 Positive
Tests on Residue
Test Typical
Requirement
Minimum Maximum
Penetration, 77°F AASHTO T49 40 90
Ductility, 77°F, mm AASHTO T51 400 ---
Polymer Content, %
See Section 94-1.01C of the Standard
Specifications for
Sampling Requirements
CTM 401 2.5% ---
OR
Torsional Recovery, % CTM 332 18 ---
A certificate of Compliance shall be furnished to the Engineer in accordance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications and these Special Provisions. The Certificate of Compliance shall include all information stipulated in Section 94, “Asphaltic Emulsions,” of the Standard Specifications. Additional information relevant to the specifications shall be furnished if requested by the Engineer. Samples will be obtained in accordance with ASTM Method D140 or such other methods as are approved by the Engineer.

Aggregate

Page 158 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
101
Aggregate for the slurry seal shall comply in all respects to requirements in Section 37-3, “Slurry Seal and Microsurfacing,” of the Standard Specifications for a Type II slurry seal except for the following:

Aggregate shall consist of sound, durable, crushed stone or crushed gravel. If approved by the Engineer, mineral filler will be allowed.

Aggregates shall be 100% crushed with no rounded particles, volcanic in origin, and black in color. The use of gray or light-colored aggregate will not be allowed. The percentage composition by weight of the aggregate shall conform to the following grading:

Percentage Passing
Sieve sizes Type II
3/8” (9.5 – mm) 100
No. 4 (4.75 – mm) 90-100
No. 8 (2.36 – mm) 65-90
No. 16 (1.18 – mm) 40-70
No. 30 (600 – um) 25-50
No. 200 (75 – um) 5-15
Theoretical asphalt content, %
based on dry aggregate

7.5-13.5
Approximate application rate
(Pounds/Square Yard)
14-18
The aggregate shall also conform to the following quality requirements:

Test Method of Test Requirement
Sand Equivalent CTM 217 60 min.

Durability Index CTM 229 55 min.

When the results of both the aggregate grading and the Sand Equivalent test do not conform to the requirement specified, both payments to the Town shall apply. The Town may deduct these amounts from any monies due, or that may become due the Contractor under the contract. No single aggregate grading or Sand Equivalent test shall represent more than 300 tons or one-day’s production whichever is smaller.

The Contractor, in accordance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications, will furnish a Certificate of Compliance for aggregates used in the slurry seal. The Certificate of Compliance shall include results of laboratory tests indicating the average gradation, minimum sand equivalent and maximum film stripping and durability index, all in accordance with Section 37-2.02, “Materials,” of the Standard Specifications.

Page 159 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
102
Mineral Filler
Mineral filler shall be either Portland Cement, hydrated lime, limestone dust, fly ash or other approved filler meeting the requirements of ASTM D242 and shall be used if required by the mix design. The mineral filler shall be considered as part of the aggregate in calculations regarding slurry seal asphalt content.

Additives
Additives may be used to accelerate or retard the mixing and setting characteristics of the slurry seal or improve the resulting finished surface. The use of additives in the slurry mix (or individual materials) shall be made initially in quantities predetermined by the mix design with field adjustments if required. If the use of additives during application requires a greater than + or – 1.0% deviation from the recommendations of the mix design, a new mix design will be performed to verify system performance at higher or lower additive levels.

Mix Design
At least seven (7) working days before slurry seal placement commences, the Contractor shall submit to the Engineer for approval a laboratory report of tests and proposed mix design covering the specific materials to be used on the project.

The percentage of asphalt emulsion proposed in the mix design shall be within the percentage range specified in Section 37-3.03B, “Proportioning,” of the Standard Specifications.

The tests and mix design shall be performed by a laboratory capable of performing the applicable International Slurry Seal Association (ISSA) tests. The proposed slurry seal mixture shall conform to the requirements specified when tested in accordance with the following tests:

Test Description Specification
ISSA TB 106 Slurry Seal Consistency, mm 30 maximum
ISSA TB-139 Wet Cohesion (using project source aggregate, asphalt emulsion and set-control agents, if
used)
30 minutes min.
60 minutes min.
12 kg-cm minimum
20 kg-cm minimum
ISSA TB-109 Excess Asphalt
By LWT Sand Adhesion
50 g/ft2 maximum
(538 g/m2 maximum)
ISSA TB-114 Wet Stripping Pass
ISSA TB 115 Compatibility Pass
ISSA TB-100 Wet Track Abrasion Loss, one-hour soak
(minimum asphalt content)
75 g/ft2 maximum
(807 g/m2 maximum)
ISSA TB-113 Mix Time (Mixing test and set time test shall be done at the highest temperature expected
during construction
Controllable to 180 sec.
minimum

Page 160 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
103
The laboratory report shall be signed by the laboratory that performed the tests and mix design and shall show the results of the tests on individual materials, comparing the test results to those required by the specifications. The report shall clearly show the proportions of aggregate, filler (as determined from the tests, minimum and maximum), water (minimum and maximum), asphalt solids content based on the dry weight of aggregate and set-control agent usage. The laboratory shall also report the quantitative effects of moisture content on the unit weight of the aggregate (bulking effect). Previous laboratory reports covering the same materials may be accepted provided they are made during the same calendar year.

The Engineer shall approve the mix design and all slurry seal materials and methods prior to use. The job mix design shall conform to the specification limits and be suitable for the traffic climate conditions, curing conditions and final use. This will include recommended application rate of slurry to suit the job conditions. Any changes in the proportions will be made only when approved by the Engineer.

Proportioning
Proportioning shall conform to the provisions in Section 37-3.03B, “Proportioning,” of the Standard Specifications and these Special Provisions.

The completed mixture, after addition of water and any set-control agent used, shall be such that the slurry seal mixture has proper workability and (a) will permit uncontrolled traffic on the slurry seal within two (2) hours after placement without the occurrence of tracking, bleeding, raveling, separation or other distresses, and (b) prevent development of bleeding, raveling, separation or other distress within fifteen (15) days after placing the slurry seal.

Mixing and Spreading Equipment
Mixing and spreading equipment shall conform to the provisions in Section 37-3.03C, “Mixing and Spreading Equipment,” of the Standard Specifications and these Special Provisions.

A minimum of two 7-cubic yard capacity or larger slurry machines shall be on the job and in good operating condition at all times. Machines must be able to negotiate all turns next to the curbs in cul-de-sacs, on initial pass in one continuous pass.

Preparation of Surface
Before the polymer modified slurry seal is applied, the pavement surface shall be swept free of all debris and loose debris using power sweepers, cracks shall be filled, and dig outs completed. The Contractor shall remove all existing weeds and plant materials in all the street sections that will receive slurry seal surfacing. Removal of weeds and plant materials shall be done using a chemical weed killer (per manufacturer’s recommendations) such as approved by the Engineer, and all these areas shall be thoroughly cleaned using compressors or other means acceptable to the Engineer.

All existing/temporary pavement markers, paint and thermoplastic shall be removed and disposed of by the Contractor.

Said removal shall not occur sooner than two days prior to the slurry sealing is performed and shall be paid under Section 10-8, “Pavement Marker, Thermoplastic Marking, and Striping Removal,” of these Special Provisions.

Manholes, valves, survey monuments, or miscellaneous frames and covers shall not receive a seal coat. These shall be protected as noted in Section 10-3, “Existing Facilities,” of these Special Provisions. Any frame or cover seal coated shall be cleaned to the satisfaction of the Engineer and the cost for the cleaning shall be borne by the Contractor.

On those streets scheduled to receive slurry seal after the application of the rubberized asphalt seal coat, the chip seal shall be allowed to age and cure under traffic for at least one week before placing the slurry mixture. A longer curing period shall be required if, in the opinion of the Engineer, the rubberized asphalt binder used for the chip seal has not

Page 161 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
104
achieved a reasonable set, which could result in damage to the cape seal if prematurely covered by the slurry mix. The Contractor shall sweep and remove all loose screenings prior to the placement of the slurry seal mix.

The Engineer will give notification to the Contractor indicating when the slurry mixture can be applied. Unless adverse weather conditions prevail, as determined by the Engineer, the curing period will not exceed two (2) weeks.

The Contractor shall patch the chip seal where any voids exist prior to application of the slurry seal. Any voids caused by automobile tires, poor adhesion of chips to emulsion, or any other cause shall be the Contractor’s responsibility to repair prior to application of slurry seal.

Placing
Placing shall conform to the provisions in Section 37-3.03D, “Placing,” of the Standard Specifications and these Special Provisions. The Contractor shall place slurry seal no later than 2 pm onto any street surface.

No application of slurry mixture shall be permitted when the temperature of the pavement to be surfaced is below 50° F or when the air temperature is below 60°F in the shade or when, in the opinion of the Engineer, road conditions, road temperatures, imminence of rain, wetness or dampness are not conducive to successful results.

The slurry mixture shall be uniformly spread by means of a controlled spreader box conforming to the requirements of Section 37-3.03C, “Mixing and Spreading Equipment,” of the Standard Specifications.

If required by the Engineer, the slurry machine shall be inspected and calibrated on a 300-foot test section. The calibration shall establish the settings required to obtain the application rate for the slurry and correct proportions of ingredients in accordance with these Special Provisions.

All surfaces to be slurry sealed shall be lightly dampened with a fog spray of water. The slurry machine shall move forward at such a speed that the fluid slurry mixture will penetrate and substantially fill all available voids. The slurry box squeegees, rubber belting, or similar material, shall be flexible enough to wipe the slurry uniformly over the surface of the roadway without gouging, scouring or abrading the existing surface or chips.

The slurry seal mixture shall be spread at a rate between 12-20 lbs./sq. yd. The exact rate will be determined in the field by the Engineer.

Areas which cannot be reached with the slurry seal machine shall be surfaced using hand squeegees to provide complete and uniform coverage. Care shall be taken to leave no unsightly appearance from the handwork. All handwork shall achieve the same type of finish as applied by the spreader box. All incidental handwork such as surfacing of driveway aprons and returns shall be done concurrently with the surfacing of the street proper.

The joint between the edge of pavement and the concrete gutter shall be sealed/filled with slurry seal and not overlap into the gutter pan. Any application spillage beyond this joint shall be removed or cleaned up by the Contractor to the satisfaction of the Engineer. Gutter spills and any tracking of slurry seal onto concrete improvements shall be cleaned immediately. The edges of the limits of the slurry seal application of both sides of the street shall be maintained in a neat and uniform line.

All lines of termination of slurry sealing shall be neat and straight. The Contractor shall use building paper or an approved equal header material at all limits of work. Longitudinal joints shall be at the crown of the street or at the edge of the traveled lanes. No excessive buildup or unsightly appearance shall be permitted on longitudinal and transverse joints.

Page 162 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
105
Care will be taken to avoid leaving ridges at the lap joints between adjoining passes. Wherever possible, joints will coincide with lane lines or in the center of the lane. In no case will ridges be allowed in the normal wheel track of vehicles. The forward speed of the slurry spreader shall be adjusted to eliminate corrugations or surface irregularities in the slurry coat, which are caused by excessive speed.

No lumping, balling, or unmixed aggregate shall be permitted. No segregation of the emulsion and fines from the coarse aggregate shall be permitted. If coarse aggregate settles to the bottom of the mix, the slurry mix shall be removed from the pavement. No excessive breaking of emulsion shall be allowed in the spreader box. No streaks caused by oversize aggregates will be left on the finished pavement and ridges or washboarding in the finished product shall not be allowed.

Weight tags shall be furnished to the Engineer for all materials delivered to the site including aggregates, emulsified asphalt for slurry and retardant.

The Contractor shall immediately remove any excess slurry from the gutters. The Contractor shall not continue to the next street until all excess slurry is removed as determined by the Engineer. No extension of time will be granted due to delay caused by non-compliance with this provision.

The Contractor shall furnish and maintain in good operating condition all tools and equipment necessary to do the work with a minimum of inconvenience to the public and shall employ sufficient personnel to operate all equipment efficiently and skillfully.

The Contractor shall refrain from using fuel or solvents of any kind for cleaning tools and equipment in such a manner as to permit spillage of diesel fuel or solvent on the pavement, curbs, gutters, parkways, or other adjoining areas.

The Contractor shall be responsible for maintaining a clear work area until the chip seal, micro surfacing, or slurry seal has set. If the newly installed microsurfacing or slurry surface is damaged, the Contractor shall remedy any noncompliant work at the Contractor’s sole expense.

Final Sweeping
Self-propelled power brooms shall be used that are capable of cleaning the existing pavement and removing loose screenings without dislodging screenings set in the asphalt-rubber mixture. A minimum of three (3) sweepings shall be performed one day, seven days, and fourteen days after placement of the slurry seal or micro surfacing to remove all loose screenings.

MICRO SURFACING (BLACK AGGREGATE)
General
The slurry seal shall consist of a mixture of a polymer modified asphalt emulsion, mineral aggregate, mineral filler, water, and specified additives. The materials shall be proportioned, mixed and uniformly spread over a properly prepared surface as directed by these Special Provisions and the Engineer. The slurry seal shall conform to the requirements of Section 37-3, “Slurry Seal and Micro-surfacing,” of the Standard Specifications and these Special Provisions. The completed slurry seal shall leave a homogeneous mat and adhere firmly to the prepared surface.

Asphaltic Emulsion
Asphaltic Emulsion used for micro surfacing shall be designated as a quick-set latex modified cationic type CQS-1H emulsion and shall conform to the requirements specified in AASHTO M208 and ASTM 2397. It shall pass all applicable

Page 163 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
106
storage and settlement tests. The latex shall be milled into the emulsion. The cement mixing test shall be waived for this emulsion. The completed micro surfacing shall leave a homogeneous mat and adhere firmly to the prepared surface.

Each load of polymer modified asphaltic emulsion shall have a certificate from the asphalt emulsion manufacturer guaranteeing that either asphalt blending or “co-milling” processes were used. The certificate shall also state the percentage of the solid rubber polymer added by weight of the asphalt as well as the composition of the polymer. The addition of latex to the emulsion after emulsion manufacturing is prohibited.

A certificate of Compliance shall be furnished to the Engineer in accordance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications and these Special Provisions. The Certificate of Compliance shall include all information stipulated in Section 94, “Asphaltic Emulsions,” of the Standard Specifications. Additional information relevant to the specifications shall be furnished if requested by the Engineer. Samples will be obtained in accordance with ASTM Method D140 or such other methods as are approved by the Engineer.

Distillation of residue will be at a temperature of 350 degrees F for 20 minutes. Softening point of the residue shall be 140 degrees F minimum. Viscosity, absolute at 140 degrees F, shall be 8,000 poise minimum.

The water shall be potable and shall be free of harmful soluble salts.

Special quick-setting emulsifier agents shall be milled into the asphalt emulsion. The emulsified asphalt shall be so formulated that when the paving mixture is applied at thickness of one inch width the relative humidity at not more than 50% and the ambient air temperature of at least 75 degrees F, the material will cure sufficiently so that rolling traffic can be allowed in one hour with no damage to the surface, as verified by the Engineer.

A mineral additive shall be introduced to the mineral aggregate and may be any recognized brand of non-air entrained Portland cement or hydrated lime that is free of lumps, or other approved mineral additive. The amount of mineral additive needed shall be determined by the laboratory mix design and will be considered as part of the material gradation requirement. A liquid field control additive is introduced and blended with water to provide effective control of the required quick-set properties. This additive shall be made available by the chemical supplier or emulsion manufacturer and certifiable as being compatible with the mixture.

Aggregate
The mineral aggregate used shall be of the type and grade specified for micro surfacing and shall comply in all respects to requirements in Section 37-3, “Slurry Seal and Micro-surfacing,” of the Standard Specifications.

The aggregate shall be manufactured crushed stone such as granite, slag, limestone, chat, or other high-quality aggregate or combination thereof. Aggregates shall be 100% crushed with no rounded particles, volcanic in origin, and black in color. The use of gray or light-colored aggregate will not be allowed.

The aggregate including natural fines when tested by AASHTO methods T11 or T27 or ASTM C117 or C136, should met the referenced gradation requirements.

To limit the permissible amount of clay like fines in an aggregate, a sand equivalent value of 65 or higher is required when tested by ASTM 2419.

The aggregate shall have a weighted loss of not more than 15% when the sodium sulfate test is used or 20% when the magnesium sulfate test is used.

The aggregate wear, from resistance to abrasion, shall be a maximum of 35% when using AASHTO T96 or ASTM C131 test methods.

Page 164 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
107
Aggregate-Recommended Gradations:

Percentage Passing
Screen Size Type II Type III
3/8” 100 100
No. 4 90-100 70-90
No. 8 65-90 45-65
No. 16 40-65 30-50
No. 30 25-45 19-34
No. 50 15-30 12-25
No. 100 10-21 7-18
No. 200 5-13 4-12
The aggregate shall also conform to the following quality requirements:

Test Method of Test Requirement
Sand Equivalent CTM 217 65 min.

Durability Index CTM 229 65 min.

Percentage of Crushed
Particles
CTM 205 95% min.

Los Angeles Rattler,
Loss at 500 Revolutions
CTM 211 35% max.

Suggested Application Rate:

Type II–Urban and Residential Streets: 18-22 lbs. per sq. yd.

Type III–Primary Routes: 25-30 lbs. per sq. yd.

Wheel Ruts: Application rates as required
The Contractor, in accordance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications, will furnish a Certificate of Compliance for aggregates used in the slurry seal. The Certificate of Compliance shall include results of laboratory tests indicating the average gradation, minimum sand equivalent and maximum film stripping and durability index, all in accordance with Section 37-2.02, “Materials,” of the Standard Specifications.

The Contractor, in accordance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications, will furnish a Certificate of Compliance for aggregates used in the slurry seal. The Certificate of Compliance shall include

Page 165 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
108
results of laboratory tests indicating the average gradation, minimum sand equivalent and maximum film stripping and durability index, all in accordance with Section 37-2.02, “Materials,” of the Standard Specifications.

Mix Design
At least seven (7) working days before slurry seal placement commences, the Contractor shall submit to the Engineer for approval a laboratory report of tests and proposed mix design covering the specific materials to be used on the project.

Once the materials are approved, no substitution will be permitted unless first tested and approved by the laboratory preparing the mix design.

The qualified laboratory shall develop the job mix design and present certified test results for the contractor’s approval.

Compatibility of the aggregate and emulsion shall be verified by the mix design. The job mix formula shall provide a minimum Marshall stability of 1800 pounds and a flow of 6 to 16 units when tested according to the ASTM 1559 or AASHTO 245 procedure as modified. All component material used in the mix design shall be representative of the material proposed by the contractor for use on the project.

The Engineer shall approve the design mix and all micro surfacing materials and methods prior to use. The component materials shall be within the following limits.

Residual Asphalt 5% to 9% by dry weight of aggregate
Mineral Additive 0.5% to 3% by dry weight of aggregate
Latex Modifier As required to provide specified
properties
Field Control Additive As required to provide the specified properties
Water As required to produce consistency
Mixing and Spreading Equipment
Mixing and spreading equipment shall conform to the provisions in Section 37-3.03C, “Mixing and Spreading Equipment,” of the Standard Specifications and these Special Provisions. All equipment, tools, and machines used in the performance of this work shall be maintained in satisfactory working condition at all times to ensure a high quality of product.

The material shall be mixed by a self-propelled micro surfacing mixing machine which shall be a continuous flow mixing unit able to accurately deliver and proportion the aggregate, emulsified asphalt, mineral and field control additives, and water to a revolving multi-blade twin shafted mixer and discharge the mixed product on a continuous flow basis. The machine shall have sufficient storage capacity for aggregate, emulsified asphalt, mineral and field control additives, and water to maintain an adequate supply to the proportioning controls. The machine may be equipped with self-loading devices which provide for the loading of materials while continuing to lay micro-surfacing, thereby minimizing construction joints.

Individual volume or weight controls for proportioning each material to be added to the mix, i.e., aggregate, emulsified asphalt, mineral and field control additives, and water shall be provided and properly marked. These proportioning

Page 166 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
109
devices are usually revolution counters or similar devices and are used in material calibration and determining the materials output at any time.

The emulsion pump shall be a heated positive displacement type.

The surfacing mixture shall be spread uniformly by means of a mechanical type spreader box attached to the mixer, equipped with paddles to agitate and spread the materials throughout the box. A front seal shall be provided to insure no loss of mixture at the road contact point. The rear seal shall act as final strike off and shall be adjustable. The mixture shall be spread to fill cracks and minor surface irregularities and leave a uniform skid resistant application of material on the surface. The spreader box and rear strike off shall be so designed and operated that a uniform consistency is achieved to produce a free flow of material to the rear strike off. The longitudinal joint where two passes join shall be neat appearing, uniform and lapped. All excess material shall be removed from the job site prior to opening the road.

The spreader box shall have suitable means provided to side shift the box to compensate for variations in pavement width and longitudinal alignment. A rut box shall be available to prefill wheel ruts when necessary prior to overlay to eliminate puddles or runoff interruption. The box shall be readily adjustable from 4’-6’ width hydraulically adjusted strike off screeds to attain maximum grade and profile.

Suitable surface cleaning equipment, traffic control equipment, hand tools and any support equipment shall be provided as necessary to perform the work.

Preparation of Surface
Before the micro surfacing is applied, the pavement surface shall be swept free of all debris and loose debris using power sweepers, cracks shall be filled, and digouts completed. The area to be micro surfaced shall be thoroughly cleaned of any loose aggregate and soil, particularly soil that is bound to the surface. The Contractor shall remove all existing weeds and plant materials in all the street sections that will receive micro surfacing. Removal of weeds and plant materials shall be done using a chemical weed killer (per manufacturer’s recommendations) such as approved by the Engineer, and all these areas shall be thoroughly cleaned using compressors or other means acceptable to the Engineer.

All existing/temporary pavement markers, paint and thermoplastic shall be removed and disposed of by the Contractor.

Said removal shall not occur sooner than two days prior to the micro surfacing is performed and shall be paid under Section 10-8, “Pavement Marker, Thermoplastic Marking, and Striping Removal,” of these Special Provisions.

Manholes, valves, survey monuments, or miscellaneous frames and covers shall not receive a seal coat. These shall be protected as noted in Section 10-3, “Existing Facilities,” of these Special Provisions. Any frame or cover seal coated shall be cleaned to the satisfaction of the Engineer and the cost for the cleaning shall be borne by the Contractor.

Placing
Placing shall conform to the provisions in Section 37-3.03D, “Placing,” of the Standard Specifications and these Special Provisions.

The material shall be spread only when the road surface and atmospheric temperatures are at least 45° F and rising and the weather is not rainy and there is no forecast of temperatures below 32° F within 48 hours from the time of placement of the mixture.

The slurry mixture shall be uniformly spread by means of a controlled spreader box conforming to the requirements of Section 37-3.03C, “Mixing and Spreading Equipment,” of the Standard Specifications.

Page 167 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
110
Suitable methods shall be used by the contractor to protect the micro surface from traffic until the new surface will support traffic without damage.

The surface should be pre-wetted by fogging ahead of the spreader box when required by local conditions. The rate of application of the fog spray shall be adjusted during the day to suit temperatures, surface texture, humidity, and dryness of the pavement surface.

The micro surfacing mixture shall be of the desired consistency upon leaving the mixer and no additional materials should be added. A sufficient amount of material shall be carried in all parts of the spreader at all times so that a complete coverage is obtained. Overloading of the spreader shall be avoided. No lumping, balling, or unmixed aggregate shall be permitted.

No streaks, such as those caused by oversized aggregate, will be left in the finished surface. If excessive oversize develops, the job will be stopped until the contractor proves to the Engineer that the situation has been corrected.

No excessive buildup, uncovered areas or unsightly appearances shall be permitted on longitudinal or transverse joints.

The Contractor shall provide suitable width spreading equipment to produce a minimum number of longitudinal joints throughout the project. When possible, longitudinal joints shall be placed on lane lines. Half passes and odd widths passes will be used only in minimum amounts. If half passes are used, they shall not be the last pass of any paved areas.

The micro surfacing mixture shall possess sufficient stability so that premature breaking of the material in the spreader box does not occur. The mixture shall be homogenous during and following mixing and spreading. It shall be free of excess water or emulsion and free of segregation of the emulsion and aggregate fines from the coarser aggregate.

Areas which cannot be reached with the mixing machine shall be surfaced using hand squeegees to provide complete and uniform coverage. The area to be hand worked shall be lightly dampened prior to mix placement. Care shall be exercised to leave no unsightly appearance from handwork. All handwork shall achieve the same type of finish as applied by the spreader box. All incidental handwork such as surfacing of driveway aprons and returns shall be done concurrently with the surfacing of the street proper.

Care shall be taken to insure straight lines along curbs and shoulders. No runoff on these areas will be permitted. Lines at intersections will be kept straight to provide a good appearance.

Weight tags shall be furnished to the Engineer for all materials delivered to the site including aggregates, emulsified asphalt for slurry and retardant.

The Contractor shall immediately remove any excess micro surfacing from the gutters. The Contractor shall not continue to the next street until all excess micro surfacing is removed as determined by the Engineer. No extension of time will be granted due to delay caused by non-compliance with this provision.

The Contractor shall furnish and maintain in good operating condition all tools and equipment necessary to do the work with a minimum of inconvenience to the public and shall employ sufficient personnel to operate all equipment efficiently and skillfully.

The Contractor shall refrain from using fuel or solvents of any kind for cleaning tools and equipment in such a manner as to permit spillage of diesel fuel or solvent on the pavement, curbs, gutters, parkways, or other adjoining areas.

The Contractor shall be responsible for maintaining a clear work area until the chip seal, micro surfacing, or slurry seal has set. If the newly installed micro surfacing or slurry surface is damaged, the Contractor shall remedy any noncompliant work at the Contractor’s sole expense.

Page 168 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
111
Final Sweeping
Self-propelled power brooms shall be used that are capable of cleaning the existing pavement and removing loose screenings without dislodging screenings set in the asphalt-rubber mixture. A minimum of three (3) sweepings shall be performed one day, seven days, and fourteen days after placement of the slurry seal or micro surfacing to remove all loose screenings.

8.9. TRAFFIC SIGNAL
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work involved in compliance with the Plans, Specifications, and “Traffic Signals,” of the Technical Specification, including but not limited to installation of detector loops, installation of new video detection system, traffic control, utility coordination, and all incidentals to complete this work, shall be included and paid for in the appropriate bid item price.

Bid Item #24 Remove Existing Loops and Video Detection System L.S.

Bid Item #25 Furnish and Install New Video Detection Camera Ea.

General
Traffic signals, street lighting, and electrical services shall conform to the provisions of Section 86, “Electrical Systems,” of the Standard Specifications, the Town of Los Gatos Electrical Specifications and Details, the Standard Plans, and these Special Provisions.

Traffic signal work shall include the following:

Removal the existing video detection system (VIDS) at Los Gatos-Saratoga Road (Highway 9) and Alberto Way for the eastbound and westbound approaches, removal of the existing loops on the northbound and southbound approaches and replacement with a new video detection system per Iteris specifications for all four approaches.

Preservation of Existing Traffic Signal and Street Lighting Systems Attention is directed to Section 86-1.06 of the Standard Specifications regarding the maintenance of existing electrical systems.

All existing traffic safety lighting shall be maintained throughout the project area until the new safety lighting is fully operable and approved by the Engineer.

Where new conductors/cables are to be installed in existing conduits, contractor shall remove and protect existing conductors, clean the conduits, and re-pull existing with new conductors together into existing conduits.

Signal Conductors and Wiring
Conductors for vehicle and pedestrian signals shall not run to a terminal block on a standard unless they are to be connected to a signal head that is mounted thereon, and any additional signal heads on other standards that are to be connected to these conductors shall be connected only in the pull box, not on the terminal block. Conductors for each signal mast arm shall run continuously from each signal head to the pull box and not enter the terminal block compartment.

Page 169 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
112
Conductor insulation shall cover the entire length of the wire except near the ends of the termination points. All wires shall be clearly marked inside the controller cabinet designating the appropriate signal phase.

At least six feet of slack shall be provided in the pull box nearest each signal standard, for those conductors terminating in that standard; and 3 feet of slack shall be provided for each conductor in all other pull boxes. A minimum of six feet of slack shall be provided in the controller cabinet. The wire bundle entering the controller cabinet shall be coiled in the bottom of the cabinet.

Conductors No. 10 and smaller shall be solid copper traffic signal conductors Type USE, THW or TW with a minimum insulation thickness of 40 mil.

Detector Loops
Loop conductor shall be Type 2 loop wires. No splice is permitted.

Splice loop conductor to existing detector lead-in cable in existing pull boxes adjacent to existing detector handhole.

Sealant for filling loop slots shall be asphaltic emulsion sealant for asphaltic concrete pavement application as specified in the Standard Specifications.

The Contractor shall contact the Engineer 72-hours in advance of the work which will cut or damage any existing detector loop or lead-in wire. The Town will install appropriate timing in the traffic signal controller prior to the Contractor cutting the existing loops.

Failure to comply with these requirements shall result in a liquidated damage of $500 per day for each traffic signal loop not replaced within 5 days following the damage. All liquidated damages in this Contract are cumulative.

Removing, Reinstalling, or Salvaging Electrical Equipment Removing and/or salvaging of equipment shall conform to the provisions of Section 86-7.01, “Removing, Reinstalling, or Salvaging Electrical Equipment,” of the Standard Specifications and the following:

All salvaged equipment shall be delivered to the Town of Los Gatos Service Center at 41 Miles Avenue. The Contractor shall coordinate with the Engineer forty-eight (48) hours in advance to arrange for acceptance of salvaged equipment.

The Contractor shall protect equipment from damage during removal, relocation, and re-installation.

Conductors
Identification stripe colors shall be permanently impregnated the conductor insulating jacket. No. 10 or smaller traffic signal conductors shall be solid copper with either:
• Type USE insulation with a minimum thickness of 1 mm (40 mils), or • Type THW insulation with a minimum thickness of 1 mm (40 mils).

Splicing and Splicing Insulation
All connectors and terminals installed to the conductors, including those for detector circuits, shall be pressure connector crimp type and shall be soldered after being applied with the applicable tool recommended by the manufacturer of the connector.

Heat shrinkable insulating tubing shall be applied after completion of the splicing procedure. Insulation over the connector shall consist of a heat shrinkable, mastic lined, 1 mm minimum polyolefin cable sleeve, or cover, to which

Page 170 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
113
heat shall be applied at a temperature greater than 120 degrees C with an electric hot air gun until the sleeve or cover shrinks and covers the connector and the mastic material has flowed completely around and between the conductors to form a waterproof insulation. The conductor insulation shall not be damaged due to application of the heat shrinkable insulation sleeve.

Identification Labeling
Identification shall be by T&B Ty-Rap Cable Ties No. TY553M, fastened to the conductors/cables in such a manner that they will not move along the conductors/cables. The flags on the Ty-Rap shall be marked with a Ty-Rap marking pen No.

WT 163 M-1 (Black) or approved equal. All phase conductors shall be labeled by phase designation in the pull boxes nearest their termination and in the controller cabinet. Detector cables shall be labeled by channel designation in the pull boxes nearest their termination and in the controller cabinet. Detector cables shall be also labeled by phase designation in the controller cabinet nearest their termination at the detector amplifiers.

Bonding and Grounding
Bonding and grounding shall conform to Section 86-2.10, “Bonding and Grounding,” of the Standard Specifications and the following:

Grounding jumper shall be attached by a 3/16 inch or larger brass bolt in the signal standard, lighting standard, service pedestal, or controller cabinet and shall be run to the conduit, ground rod, or bonding wire in adjacent pull box.

All metallic electrical equipment including, but not limited to, poles, metal conduit, service pedestals, controller cabinets, anchor bolts, foundation reinforcement, and metallic cable sheaths, shall be tied to ground electrical potential and shall be interconnected by means of copper conductors and clamps to form a single, grounded and electrically bonded system. Grounding of the electrical system shall be accomplished by means of approved 5/8-inch x 10-foot copper-clad steel or 3/4-inch x 10-foot galvanized steel ground rods installed in all cabinet foundations and in all pull boxes that contain conduits with equipment ground conductors as shown on the project plans. Ground rods shall extend above the finished cabinet foundation or grouted pull box bottom sufficiently to attach a ground clamp and #8 AWG bare copper equipment ground conductor.

All PVC conduit shall contain 1 bare stranded No. 8 AWG copper wire for bonding.

Iteris SmartCycle Bike Indicator Sign with Light
The Contractor shall furnish and install Iteris recommended SmartCycle Bike Indicator Sign with Light or approved equivalent on existing traffic signal pole. The Contractor shall relocate existing mounting bracket for pedestrian signal as needed to accommodate installation of indicator. The Contractor shall connect indicator and CAT 5E shielded cable into the traffic signal controller, including installation of any necessary equipment as needed for fully operational signal.

Video Detection Systems
The Contractor shall furnish and install Iteris recommended video camera or approved equivalent compatible within the existing Iteris Edge 2 Video Image Detection System (VIDS), a Pelco camera bracket, mounting kit, Iteris Edge 2-2 processor card, hybrid (power and coax) cable and ancillary equipment as specified by Iteris (or approved equals).

Camera resolution, image size, and lens angle will be determined by the manufacturer based on optimum system performance. The environmentally sealed video camera with IR filter shall include heater, blower, enclosure, sun shield and mounting brackets, and have at least twelve user programmable detection zones. The camera shall be from the same manufacturer brand as the video image detection processing unit. All other necessary equipment for proper and complete operation within the existing VIDS shall be included.

Page 171 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
114
This section describes the minimum requirements for providing a new camera to function within the existing Video Image Detection System (VIDS).

A. Wiring between the new camera unit and the video detection system unit in the traffic signal cabinet shall be accomplished with a 3-conductor cable that will transmit video, data, and power. No other cable shall be required or allowed.

B. All software and hardware, for installation, operation, and maintenance will be supplied along with necessary technical support upon setup. Ongoing technical support, and updated software revisions shall be provided to the local agency staff at no cost, for a period of no less than 3 years. Also, training by the manufacturer shall be provided at the convenience of local agency staff.

C. A factory representative shall be present at the initial turn-on of the new camera to monitor setup, to provide assistance as needed, and to ensure proper operation.

D. Camera installation shall be installed on the luminaire mast arm, signal mast arm, or signal pole as indicated on the project plans, with the manufacturers’ recommended brackets. Camera brackets shall provide adjustments for both vertical and horizontal positioning of the camera. Camera attachments shall be designed to securely fasten the camera to the luminaire mast arm. Hardware shall be stainless steel or galvanized steel.

E. The new camera shall be warranted against manufacturing defects in materials and workmanship for a period of two years from date of installation.

The Contractor shall mount the camera and shall terminate the video cables at the camera and in the cabinet.

8.10. PAVEMENT MARKER, THERMOPLASTIC MARKING, AND STRIPING REMOVAL Measurement and Payment
Full compensation for furnishing all labor, materials, tools, flaggers, equipment, and all incidentals, and for doing all of the work in compliance with the Plans, Specifications, and “Pavement Marker, Thermoplastic Marking, and Striping Removal” of the Technical Specifications, including full compensation for any additive alternate work, shall be included and paid for in the appropriate bid item price.

Bid Item #26 Pavement Marker and Striping Removal L.S.

General
Pavement marker, markings and striping removal shall conform to the Plans and these Contract Documents.

Existing pavement markers, thermoplastic pavement markings, and striping, and paint markings and striping shall be removed by grinding prior to placement of the new surface. The grinder shall be specifically designed for the purpose of removing existing traffic stripes and markings and shall conform to the provisions of Section 84-9.03 of the Standard Specifications. Immediately upon removal of the markings and striping, temporary markings and striping shall be placed.

Grinding operations shall be conducted to keep all removed pavement material from entering the storm drain system.

The operation shall be controlled and contained so as not to impair the safe passage of traffic adjacent to the work site.

Existing pavement markers shall be removed prior to placing the new surfacing (rubber chip seal, rubber cape seal, slurry seal, micro surfacing, and overlay).

Page 172 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
115
The location of all striping, markings, and markers shall be marked out and documented by the Contractor prior to removal of any striping, markers, and/or thermoplastic material and before placing the new surfacing (rubber chip seal, rubber cape seal, slurry seal, micro surfacing, and overlay). This information shall be given to the Engineer for review prior to any striping removal.

All traffic striping and pavement markings (legends) covered by or removed prior to the surfacing or otherwise damaged by the Contractor’s operations shall be replaced in kind in the same location and count.

Existing pavement striping, markings, and markers which are outside the work area are not to be removed and shall be protected by the Contractor. Any striping, markings, or markers which are to remain, which are damaged or rendered useless by the Contractor's operations, shall be restored by the Contractor to the Engineer's satisfaction and at the Contractor's sole expense.

The Contractor shall review all existing striping and pavement markings in the field prior to submitting a bid.

8.11. TEMPORARY PAVEMENT DELINEATION
Measurement and Payment
Full compensation for furnishing, placing, maintaining, replacing (regardless of the number of times it is required), and removing temporary traffic stripes, temporary markings, and temporary pavement markers shall be considered as included in the lump sum price paid for under “Traffic Control Requirements,” and no additional compensation will be allowed therefor.

General
Temporary pavement delineation shall be furnished, placed, maintained and removed in accordance with the CA MUTCD, Section 12 of the Standard Specifications, and these Contract Documents. Nothing in these Contract Documents shall be construed as to reduce the minimum standards specified in the CA MUTCD or as relieving the Contractor from his responsibility as provided in Section 7-1.04, “Public Safety,” of the Standard Specifications and these Contract Documents.

Lane line or centerline pavement delineation shall be provided at all times for travel lanes open to public traffic.

Whenever the work covers or causes obliteration of pavement delineation, temporary pavement delineation or permanent traffic stripes shall be in place prior to opening the traveled way to public traffic.

Surfaces on which temporary pavement delineation is to be applied shall be cleaned of all dirt and loose material and shall be dry when the pavement delineation is applied.

The Contractor shall perform all work necessary to establish satisfactory alignment for temporary pavement delineation.

Temporary pavement delineation that is damaged from any cause during the progress of the work shall be immediately repaired or replaced at the Contractor’s sole expense.

Temporary Striping
Whenever existing traffic striping or markings have been removed, paved over, or otherwise obliterated, temporary striping or markings shall placed with paint on the same day as traffic striping and markings are removed. Slurry tabs may be used as the direction of the Engineer. If slurry tabs are allowed, they shall be provided as follows: Slurry tabs of the appropriate color as approved by the Engineer shall be installed and placed on twenty-four (24) foot intervals to delineate all four (4) inch traffic stripes. All channelization lines (solid eight (8) inch or twelve (12) inch line markings) shall be temporarily restored with a double row of slurry tabs as approved by the Engineer. All crosswalks shall be

Page 173 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
116
restored with a double row of slurry tabs as approved by the Engineer. All pavement markers separating multiple turning lanes shall be replaced with slurry tabs on a ten (10) foot spacing.

Temporary traffic striping and marking shall be removed and replaced with permanent striping and markings as soon as the final pavement surface has cured sufficiently to receive the permanent traffic paint or thermoplastic. Permanent pavement markers shall be installed on the same day that the permanent traffic striping and markings are installed, however, the installation of pavement markers shall be done only after all traffic striping and markings are installed. The Contractor shall maintain the temporary striping until their permanent traffic striping and markings are placed.

When no longer required for the direction of public traffic, as determined by the Engineer, the temporary traffic stripe and pavement marking tape and temporary pavement markers, applied to existing pavement, the top layer of new pavements, or any other paved surface where the previously placed pavement delineation conflicts with the new traffic pattern, shall be removed and disposed of in accordance with Section 5-1.36C, “Nonhighway Facilities,” of the Standard Specifications and all lines and marks used to establish the alignment for the temporary traffic stripes, pavement markings, and temporary pavement markers shall be removed from the pavement.

8.12. TRAFFIC STRIPING, PAVEMENT MARKINGS, AND MARKERS
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications, and “Traffic Stripes, Pavement Markings, and Markers" of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #27 Detail 2 Striping-Thermoplastic L.F.

Bid Item #28 Detail 9 Striping-Thermoplastic L.F.

Bid Item #29 Detail 22 Striping-Thermoplastic L.F.

Bid Item #30 Detail 24 Striping-Thermoplastic L.F.

Bid Item #31 Detail 27B Striping-Thermoplastic L.F.

Bid Item #32 Detail 29 Striping-Thermoplastic L.F.

Bid Item #33 Detail 38 Striping-Thermoplastic L.F.

Bid Item #34 Detail 39 Striping-Thermoplastic L.F.

Bid Item #35 12" Limit Line (Stop Line) (White)-Thermoplastic L.F.

Bid Item #36 Crosswalk (White)-Thermoplastic L.F.

Bid Item #37 Crosswalk-TLG Std. TR-I (White)-Thermoplastic L.F.

Bid Item #38 Crosswalk-TLG Std. TR-I (Yellow)-Thermoplastic L.F.

Page 174 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
117
Bid Item #39 4" Hatch (Red)-Thermoplastic L.F.

Bid Item #40 4" Hatch (White)-Thermoplastic L.F.

Bid Item #41 4" Hatch (Yellow)-Thermoplastic L.F.

Bid Item #42 6" Hatch (White)-Thermoplastic L.F.

Bid Item #43 STOP Legend-Thermoplastic Ea.

Bid Item #44 KEEP Legend-Thermoplastic Ea.

Bid Item #45 CLEAR Legend-Thermoplastic Ea.

Bid Item #46 25 Legend-Thermoplastic Ea.

Bid Item #47 Employee Permit Parking Legend-Thermoplastic Ea.

Bid Item #48 Type I Arrow-Thermoplastic Ea.

Bid Item #49 Type IV (L) Arrow-Thermoplastic Ea.

Bid Item #50 Type IV (R) Arrow-Thermoplastic Ea.

Bid Item #51 Type VII (L) Arrow-Thermoplastic Ea.

Bid Item #52 On-Street Parking "T"-TLG Std. TR-L-Thermoplastic Ea.

Bid Item #53 Off-Street Parking Double Stripe-TLG Std. ST-264-Thermoplastic Ea.

Bid Item #54 Accessible Parking-TLG Std. ST-265-Thermoplastic Ea.

Bid Item #55 Blue Curb L.F.

Bid Item #56 Red Curb L.F.

Bid Item #57 White Curb L.F.

Bid Item #58 School Bus Only Curb Marking Ea.

Bid Item #59 Green Back Bike Lane Symbol with Arrow Legend TLG-Std. TRA-ThermoplasticEa.

Bid Item #60 Green Bike Lane-Thermoplastic L.F.

Page 175 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
118
Bid Item #61 Dashed Green Bike Lane-Thermoplastic L.F.

Bid Item #62 Shared Roadway Bicycle Marking-TLG Std. TR-G-Thermoplastic Ea.

Bid Item #63 Blue Reflective Pavement Marker Ea.

Bid Item #A1.11 12" Limit Line (Stop Line) (White)-Thermoplastic L.F.

Bid Item #A1.12 STOP Legend-Thermoplastic Ea.

Bid Item #A1.13 Blue Reflective Pavement Marker Ea.

General
Painting traffic stripes (traffic lines) and pavement markings (legends) shall conform to the CA MUTCD, Section 84 of the Standard Specifications, the striping tie out plans as generated by the Contractor and approved by the Engineer under the Plans, detail drawings as shown in Attachment B, and “Pavement Marker, Thermoplastic Marking and Striping Removal,” of these Contract Documents. Traffic Stripes and marking shall be installed as shown on the approved striping tie-out plans or as directed by the Engineer.

All traffic stripes and pavement markings shall be laid out in the field by the Contractor and reviewed and approved by the Engineer five (5) working days prior to any final installation. Any striping and/or marking installed by the Contractor that the Engineer has not pre-approved, and that the Engineer determines are installed improperly or in the wrong locations, shall be removed and replaced to the satisfaction of the Engineer at the Contractor’s sole expense.

Paint for Traffic Stripes
Paint for the traffic stripes, curb painting, and pavement markings shall be Rapid Dry Water Borne paint in accordance with Sections 84, “Markings,” of the Standard Specifications and shall be applied in two coats.

Paint shall be applied after the final pavement surface has cured sufficiently to receive the permanent traffic paint.

Surfaces shall be cleaned of all dirt and loose material and shall be dry when the paint is applied.

Curbs shall be painted at locations shown on the Plans and as directed by the Engineer. Application shall consist of two coats of traffic paint of the appropriate color applied to the face and top of the curb.

Pavement markings shall be installed with stencils belonging to the Contractor that are determined to be identical to the Town’s stencils.

The Contractor shall install the first coat of the paint within seven (7) calendar days of the final resurfacing. After fourteen (14) calendar days, the second coat of paint shall be applied after the final resurfacing.

Raised Pavement Markers
Pavement markers shall conform to the CA MUTCD, Section 81, “Miscellaneous Traffic Control Devices,” of the Standard Specifications, and these Contract Documents. All non-reflective pavement markers shall be ceramic. Plastic pavement markers shall not be allowed.

Page 176 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
119
Adhesive shall be hot melt bituminous adhesive conforming Section 81, “Miscellaneous Traffic Control Devices,” of the Standard Specifications and these Contract Documents.

Markers shall not be placed on new hot mix asphalt surface until the surface has been open to public traffic for a period of not less than seven days when hot melt bituminous adhesive is used, and not less than 14 days when epoxy adhesive is used. Placement of pavement markers shall be completed within three weeks of application of the new resurfacing of the respective roadway.

All pavement markers in place (outside the limits of the work) shall be protected from damage and shall be clean and undamaged after completion of the project. Any damage to the newly placed or existing markers due to the failure of the Contractor to protect the work, and correction of errors, shall be repaired by the Contractor at no additional cost.

Blue reflective (Caltrans Type BB) fire hydrant pavement markers shall be installed conforming to the provisions of the CA MUTCD Section 3B.11, “Raised Pavement Markers,” and Figure 3B-102 (CA).

A Certificate of Compliance shall be furnished as specified in Section 6-2.03C, “Certificates of Compliance,” of the Standard Specifications for reflective pavement markers. Said certificate shall also certify that the reflective pavement markers conform to the prequalified testing and approval of Caltrans, division of Traffic Operations, and where manufactured in accordance with the approved quality control program.

Thermoplastic Traffic Stripe and Pavement Marking
Thermoplastic traffic stripes (traffic lines) and pavement markings shall be applied in conformance with Section 84, " Markings," of the Standard Specifications and these Contract Documents.

Concrete pavement shall be painted with a primer before thermoplastic placement.

Paint shall be applied after the final pavement surface has cured sufficiently to receive the permanent traffic paint.

Surfaces shall be cleaned of all dirt and loose material and shall be dry when the paint is applied.

Thermoplastic material shall be free of lead and chromium and shall conform to the requirements in State Specification PTH-02ALKYD or PTH-02SPRAY of the Standard Specifications.

Retroreflectivity of the thermoplastic traffic stripes and pavement markings shall conform to the requirements in ASTM D6359-99. White thermoplastic traffic stripes and pavement markings shall have a minimum initial retroreflectivity of 250 mcd/m2/lux. Yellow thermoplastic traffic stripes and pavement markings shall have a minimum initial retroreflectivity of 175 mcd/m2/lux.

The color for green back symbols shall meet FHWA specifications for “green.” Where striping joins existing striping, as shown on the Plans, the Contractor shall begin and end the transition from the existing striping pattern into or from the new striping pattern a sufficient distance to ensure continuity of the striping pattern.

Payment for crosswalks shall be measured from the edge of curb or edge of gutter, whichever is less, in linear feet, and shall include the ladder striping and no additional compensation shall be allowed therefore.

Thermoplastic traffic stripes and pavement markings shall be free of runs, bubbles, craters, drag marks, stretch marks, and debris. Thermoplastic shall be extruded and placed in one coat and shall be placed five days after the final surfacing.

Sprayable thermoplastic is not allowed after the installation of surface treatments (slurry seal, chip seal, or micro surfacing). Longitudinal limit line shall be white and 12 inches in width. All pavement striping and markings shall be white unless otherwise indicated.

Page 177 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
120
Application
Use preheaters with mixers having 360-degree rotation to preheat the thermoplastic material. Apply the thermoplastic in a single uniform layer by extrusion method. Completely coat and fill voids in the pavement surface with the thermoplastic.

Extruded Thermoplastic
Apply extruded thermoplastic at a temperature from 400°F to 425°F unless a different temperature is instructed by the manufacturer. Apply extruded thermoplastic for a traffic stripe at a rate of at least 0.20 lbs./ft. of 4-inch wide solid stripe. The applied thermoplastic traffic stripe must be at least 0.060 inch thick. An applied thermoplastic pavement marking must be from 0.100 to 0.150 inches thick. Apply glass beads to the surface of the molten thermoplastic at a rate of at least 8 lbs./100 sq. ft.

8.13. WHEEL STOPS
Full compensation for furnishing all labor, materials, tools, equipment, traffic control, and incidentals for doing all the work, including the removal and disposal of existing wheel stops, rebar, concrete wheel stops, and installation, involved in compliance with the Plans, Specifications, and “Wheel Stop” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Bid Item #64 Remove Existing Concrete and Wood Wheel Stops L.S.

Bid Item #65 Install New 3' Wheel Stop Ea.

General
The Contractor shall remove and dispose of the existing wheel stops. Existing wheel stops may be concrete, rubber, or wood material. The Contractor shall furnish all the necessary supervision, labor, materials, construction tools, and equipment to complete the removal and proper disposal of wheels stop at locations specified by the Engineer. Debris shall be hauled off and disposed of the same working day in which the materials was generated. All costs associated with removing and disposing of wheels shall be borne by the Contractor and no additional compensation shall be allowed therefor.

Materials
Wheel stops shall be precast concrete with a minimum strength of 3, 500 psi, designed with H20 loading rating, and have two holes to attach to concrete or asphalt surfaces. Wheel stops shall be installed at locations as directed by the Engineer. Wheel stops shall be installed using two pieces of rebar, centered between the perpendicular parking stall lines. Wheel stops shall be installed per the manufacturer's recommendations. The Contractor shall submit the wheel stop for review.

8.14. SIGNAGE
Measurement and Payment
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for performing all the work involved in compliance with the Plans, Specifications, and “Signage,” of the Technical Specifications, shall be included and paid for in the appropriate bid item price.

Page 178 ends

ITEM NO. 6.
undefined #25-811-9901
Title: 2026 Annual Street Repair and Resurfacing
121
Bid Item #66 Remove and Salvage Signs on Existing Post Ea.

Bid Item #67 Install New Sign on Existing Post Ea.

General
Work shall conform to Section 56, “Signs,” of the Standard Specifications, the Plans, the CA MUTCD, and these Special Provisions except as noted herein.

The Contractor shall inventory existing sign locations prior to removal. Signs to be salvaged shall be removed, cleaned, and stored by the Contractor unless another location is specified. For locations where the Contractor is to remove and/or relocate existing signposts as shown on the Plans, the Contractor shall also remove the existing foundation and/or footing. Voids created by the removal shall be backfilled with cement slurry (2-sack mix) where concrete pavement is to be installed. Voids created by the removal of the signposts not in the concrete pavement area shall be backfilled with soil and compacted to at least 90% relative compaction or as specified by the Engineer.

The street signs that are obstructing the construction work shall be removed and signs shall be installed by the Contractor. New signs shall be placed on a new signpost. Prior to installation, the Engineer shall approve the location of the signs. The Contractor shall call Underground Service Alert (USA) at 1-800-227-2600 prior to digging for the sign pole installation. The Contractor shall neatly core the existing sidewalk, concrete pavement, etc. and shall install the signposts per the Town Standard Plans. The Contractor shall provide all fasteners required to install all signs as indicated on the Plans and as directed by the Engineer.

The Contractor, at the Contractor’s sole expense, shall repair materials to be salvaged that are damaged as a result of the Contractor’s operations or install a new sign per the Town of Los Gatos Standard Plans to the satisfaction of the Engineer.

The Contractor shall install the sign at the following location:

Brooklyn Avenue at Pleasant Street Not A Through Street

Page 179 ends

ITEM NO. 6.

LEGEND
2" MILL & OVERLAY
2" OVERLAY
4" MILL AND OVERLAY

RUBBER CAPE SEAL

MICRO SURFACING
ADDITIVE ALTERNATE 1-RUBBER CAPE SEAL
Ross Creek

LOS GATOS CREEK TRAIL

LOS GATOS CREEK TRAIL

LOS GATOS CREEK TRAIL

LOS GATOS CREEK TRAIL

LOS GATOS CREEK TRAIL

LOS GATOS CREEK TRAIL

LOS GATOS CREEK TRAIL
#25-811-9901 2026 ANNUAL STREET REPAIR AND RESURFACING TOWN OF LOS GATOS PARKS & PUBLIC WORKS 41 MILES AVENUE LOS GATOS, CA 95030 #25-811-9901 2026 ANNUAL STREET REPAIR AND RESURFACING KEY MAP 1 1 5 Sheet 4 Sheet 5
Sheet 2
Sheet 5
Sheet 2
Sheet 4
Sheet 3

Page 180 ends

ITEM NO. 6.

OS GATOS CREEK TRAIL TOWN OF LOS GATOS PARKS & PUBLIC WORKS 41 MILES AVENUE LOS GATOS, CA 95030 #25-811-9901 2026 ANNUAL STREET REPAIR AND RESURFACING KEY MAP 2 2 5

Page 181 ends

ITEM NO. 6.

LOS GATOS CREEK TRAIL
LOS GATOS CREEK TRAIL TOWN OF LOS GATOS PARKS & PUBLIC WORKS 41 MILES AVENUE LOS GATOS, CA 95030 #25-811-9901 2026 ANNUAL STREET REPAIR AND RESURFACING KEY MAP 3 3 5

Page 182 ends

ITEM NO. 6.

TOWN OF LOS GATOS PARKS & PUBLIC WORKS 41 MILES AVENUE LOS GATOS, CA 95030 #25-811-9901 2026 ANNUAL STREET REPAIR AND RESURFACING KEY MAP 4 4 5

Page 183 ends

ITEM NO. 6.

TOWN OF LOS GATOS PARKS & PUBLIC WORKS 41 MILES AVENUE LOS GATOS, CA 95030 #25-811-9901 2026 ANNUAL STREET REPAIR AND RESURFACING KEY MAP 5 5 5

Page 184 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street Begin Location End Location PCI Type
Length
(L.F.)
Width
(L.F.)
Total
Area
(S.F.)
Adjust
Sanitary
Sewer
Manhole to
Grade (Ea.)
Adjust
Storm
Drain
Manhole to
Grade (Ea.)
Adjust
Survey
Monument
Cover to
Grade (Ea.)
Adjust
Water
Valve
Cover to
Grade (Ea.)
Adjust
Water
Meter Box
to Grade
(Ea.)
Base Bid:

ALBERT CT ALBERT DR END 76 MS 367 34 12,478 1 1 1
ALBERT DR NINO AV CALFHILL CT 73 RC 724 33 23,892
ALBERTO WY HWY 9 440' NORTH OF LOS

GATOS SARATOGA RD
29 2MO 440 30 13,200
4 9 13
ALBERTO WY 440' NORTH OF LOS GATOS

SARATOGA RD
END 69 2MO 850 30 25,500
ALMOND BLOSSOM LN HARWOOD RD CITY LIMITS 42 2MO 490 33 16,170 2 2 4 2 BIRD AV WOODLAND AV CHESTER ST 40 2MO 380 32 12,160
BROOKLYN AV PLEASANT CHICAGO AVE 23 4MO 325 42 13,650
CALFHILL CT ALBERT DR END 65 RC 486 28 13,608 1 1
CHESTER ST WOODLAND AV UNIVERSITY AV 30 2MO 790 32 25,280 4 2 6 CHURCH ST HIGH SCHOOL CT E MAIN ST 75 MS 860 40 34,400
CLIFTON AV BROADWAY END 32 2O 390 25 9,750 1 2
COOPER CT UNIVERSITY AV END 39 2O 244 36 8,784 1 1
FISHER AV ROBERTS RD NINO AV 76 MS 1,030 37 38,110 2 2
FORREST AV ROBERTS AV OAK MEADOW DR 48 RC 433 40 17,320 1 1 HIGH SCHOOL CT E MAIN ST CHURCH ST 76 MS 163 37 6,031
LUNDY LN W MAIN ST END 22 2MO 240 20 4,800 5
NEW YORK AV PLEASANT ST END (NW) 41 2MO 404 50 20,200 1 2 6 NINO AV LOS GATOS BL FISHER AV 81 MS 628 33 20,724
NINO AV FISHER AV NINO WY 79 MS 1,110 30 33,300
NINO WY NINO AV END 87 MS 405 29 11,745
OHLONE CT ROBERTS RD END 80 MS 1,136 29 32,944 1 1
PARK AV W. MAIN ST END 37 2MO 675 65 43,875 2 7 5
ROBERTS RD EAST BLOSSOM HILL RD LOS GATOS BL 78 MS 1,341 37 49,617 TERRACE CT PLEASANT END 22 2MO 515 23 11,845 4
WOODLAND AV CHESTER ST WRAIGHT AV 36 2MO 936 23 21,528 2 1 4 WRAIGHT AV CHESTER ST HWY 9 41 2MO 885 31 27,435 1 1 1 4 N Santa Cruz Ave at E Main St
E Main St at College Ave
N Santa Cruz Ave at Andrews St
N Santa Cruz Ave at Almendra
Ave/Petticoat Ln
N Santa Cruz Ave at Bachman Ave
N Santa Cruz Ave at Royce St/Nicholson
Ave
N Santa Cruz Ave at Grays Ln
N Santa Cruz Ave at Bean Ave
N Santa Cruz Ave at Elm St
N Santa Cruz south of Elm St Midblock
N Santa Cruz north of E Main St Midblock

Page 1 of 8 ends
Page 185 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street Begin Location End Location PCI Type
Length
(L.F.)
Width
(L.F.)
Total
Area
(S.F.)
Adjust
Sanitary
Sewer
Manhole to
Grade (Ea.)
Adjust
Storm
Drain
Manhole to
Grade (Ea.)
Adjust
Survey
Monument
Cover to
Grade (Ea.)
Adjust
Water
Valve
Cover to
Grade (Ea.)
Adjust
Water
Meter Box
to Grade
(Ea.)
Mullen Ave at University Ave
University Ave at Elm St
University Ave between Main St and Elm
St Midblock
Winchester Blvd at Albright Wy
Winchester Blvd at Knowles Dr
E Main St at Montebello Wy
University Ave at Royce St
Stacia St at Los Gatos Blvd
Magneson Loop at Los Gatos Blvd
University Ave at Bentley Ave
ADDITIVE ALTERNATE 1:

HILL TOP DR WOODED VIEW DR END (#135) 55 RC 868 21 18,228 WOODED VIEW DR HAPPY ACRES RD HILL TOP DR 63 RC 1,426 20 28,520 10 9 1 WOODED VIEW DR HILL TOP DR END 40 RC 1,314 20 26,280

Page 2 of 8 ends
Page 186 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street
Base Bid:

ALBERT CT

ALBERT DR

ALBERTO WY

ALBERTO WY

ALMOND BLOSSOM LN

BIRD AV

BROOKLYN AV

CALFHILL CT

CHESTER ST

CHURCH ST

CLIFTON AV

COOPER CT

FISHER AV

FORREST AV

HIGH SCHOOL CT

LUNDY LN

NEW YORK AV

NINO AV

NINO AV

NINO WY

OHLONE CT

PARK AV

ROBERTS RD EAST

TERRACE CT

WOODLAND AV

WRAIGHT AV
N Santa Cruz Ave at E Main St
E Main St at College Ave
N Santa Cruz Ave at Andrews St
N Santa Cruz Ave at Almendra
Ave/Petticoat Ln
N Santa Cruz Ave at Bachman Ave
N Santa Cruz Ave at Royce St/Nicholson
Ave
N Santa Cruz Ave at Grays Ln
N Santa Cruz Ave at Bean Ave
N Santa Cruz Ave at Elm St
N Santa Cruz south of Elm St Midblock
N Santa Cruz north of E Main St Midblock
Adjust
Gas
Valve to
Grade
(Ea.)
Adjust
Sanitary
Sewer Clean
Out to Grade
(Ea.)
Adjust
Vault To
Grade
(Ea.)
Install New
Christy
G05
Monument
Cover (Ea.)
Detail 2
Striping
(L.F.)
Detail 9
Striping
(L.F.)
Detail
22 Striping
(L.F.)
Detail
24 Striping
(L.F.)
Detail
27B
Striping
(L.F.)
Detail
29 Striping
(L.F.)
Detail
38 Striping
(L.F.)
Detail
39 Striping
(L.F.)
12" Limit
Line (Stop
Line)
(White)
(L.F.)
Crosswalk
(White)
(L.F.)
CrosswalkTLG Std.

TR-I
(White)
(L.F.)
CrosswalkTLG Std.

TR-I
(Yellow
(L.F.)
15 1,070 100 110
20 120
1 22 300
2 20
1 520 170 39 312
18 1 130 105 100 225 58 764
20 30 20 260
1 10
20 150 105 36 340
20 2 59
500 595 80 380 470 47
3 3
82 38 196
1 40 40 20 600
1,904
720
1,760
1,360
1,600
1,040
320
480
280
200
200

Page 3 of 8 ends
Page 187 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street
Mullen Ave at University Ave
University Ave at Elm St
University Ave between Main St and Elm
St Midblock
Winchester Blvd at Albright Wy
Winchester Blvd at Knowles Dr
E Main St at Montebello Wy
University Ave at Royce St
Stacia St at Los Gatos Blvd
Magneson Loop at Los Gatos Blvd
University Ave at Bentley Ave
ADDITIVE ALTERNATE 1:

HILL TOP DR

WOODED VIEW DR

WOODED VIEW DR
Adjust
Gas
Valve to
Grade
(Ea.)
Adjust
Sanitary
Sewer Clean
Out to Grade
(Ea.)
Adjust
Vault To
Grade
(Ea.)
Install New
Christy
G05
Monument
Cover (Ea.)
Detail 2
Striping
(L.F.)
Detail 9
Striping
(L.F.)
Detail
22 Striping
(L.F.)
Detail
24 Striping
(L.F.)
Detail
27B
Striping
(L.F.)
Detail
29 Striping
(L.F.)
Detail
38 Striping
(L.F.)
Detail
39 Striping
(L.F.)
12" Limit
Line (Stop
Line)
(White)
(L.F.)
Crosswalk
(White)
(L.F.)
CrosswalkTLG Std.

TR-I
(White)
(L.F.)
CrosswalkTLG Std.

TR-I
(Yellow
(L.F.)
240
800
240
1,080
1,480
720
544
256
448
320
1 20
26

Page 4 of 8 ends
Page 188 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street
Base Bid:

ALBERT CT

ALBERT DR

ALBERTO WY

ALBERTO WY

ALMOND BLOSSOM LN

BIRD AV

BROOKLYN AV

CALFHILL CT

CHESTER ST

CHURCH ST

CLIFTON AV

COOPER CT

FISHER AV

FORREST AV

HIGH SCHOOL CT

LUNDY LN

NEW YORK AV

NINO AV

NINO AV

NINO WY

OHLONE CT

PARK AV

ROBERTS RD EAST

TERRACE CT

WOODLAND AV

WRAIGHT AV
N Santa Cruz Ave at E Main St
E Main St at College Ave
N Santa Cruz Ave at Andrews St
N Santa Cruz Ave at Almendra
Ave/Petticoat Ln
N Santa Cruz Ave at Bachman Ave
N Santa Cruz Ave at Royce St/Nicholson
Ave
N Santa Cruz Ave at Grays Ln
N Santa Cruz Ave at Bean Ave
N Santa Cruz Ave at Elm St
N Santa Cruz south of Elm St Midblock
N Santa Cruz north of E Main St Midblock
4"
Hatch
(Red)
(L.F.)
4"
Hatch
(White)
(L.F.)
4"
Hatch
(Yellow)
(L.F.)
6"
Hatch
(White)
(L.F.)
STOP
Legend
(Ea.)
KEEP
Legend
(Ea.)
CLEAR
Legend
(Ea.)
25 Legend
(Ea.)
Employee
Permit
Parking
Legend (Ea.)
Type I
Arrow
(Ea.)
Type IV
(L)
Arrow
(Ea.)
Type IV
(R)
Arrow
(Ea.)
Type V
Arrow
(Ea.)
Type VII
(L)
Arrow
(Ea.)
On-Street
Parking "T"-
TLG Std. TR-L
(Ea.)
Off-Street
Parking
Double StripeTLG Std. ST264 (Ea.)
1 2 2
1 1 1 25
1 2 48
1 3 1 2 2
1 1 5
1 6
1,235 1 4 32
2 1 1 1 2
1 361 1 3 39
1,369 630 3 3 2 9
120 1 2 1
43 1 1 1

Page 5 of 8 ends
Page 189 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street
Mullen Ave at University Ave
University Ave at Elm St
University Ave between Main St and Elm
St Midblock
Winchester Blvd at Albright Wy
Winchester Blvd at Knowles Dr
E Main St at Montebello Wy
University Ave at Royce St
Stacia St at Los Gatos Blvd
Magneson Loop at Los Gatos Blvd
University Ave at Bentley Ave
ADDITIVE ALTERNATE 1:

HILL TOP DR

WOODED VIEW DR

WOODED VIEW DR
4"
Hatch
(Red)
(L.F.)
4"
Hatch
(White)
(L.F.)
4"
Hatch
(Yellow)
(L.F.)
6"
Hatch
(White)
(L.F.)
STOP
Legend
(Ea.)
KEEP
Legend
(Ea.)
CLEAR
Legend
(Ea.)
25 Legend
(Ea.)
Employee
Permit
Parking
Legend (Ea.)
Type I
Arrow
(Ea.)
Type IV
(L)
Arrow
(Ea.)
Type IV
(R)
Arrow
(Ea.)
Type V
Arrow
(Ea.)
Type VII
(L)
Arrow
(Ea.)
On-Street
Parking "T"-
TLG Std. TR-L
(Ea.)
Off-Street
Parking
Double StripeTLG Std. ST264 (Ea.)
1 1

Page 6 of 8 ends
Page 190 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street
Base Bid:

ALBERT CT

ALBERT DR

ALBERTO WY

ALBERTO WY

ALMOND BLOSSOM LN

BIRD AV

BROOKLYN AV

CALFHILL CT

CHESTER ST

CHURCH ST

CLIFTON AV

COOPER CT

FISHER AV

FORREST AV

HIGH SCHOOL CT

LUNDY LN

NEW YORK AV

NINO AV

NINO AV

NINO WY

OHLONE CT

PARK AV

ROBERTS RD EAST

TERRACE CT

WOODLAND AV

WRAIGHT AV
N Santa Cruz Ave at E Main St
E Main St at College Ave
N Santa Cruz Ave at Andrews St
N Santa Cruz Ave at Almendra
Ave/Petticoat Ln
N Santa Cruz Ave at Bachman Ave
N Santa Cruz Ave at Royce St/Nicholson
Ave
N Santa Cruz Ave at Grays Ln
N Santa Cruz Ave at Bean Ave
N Santa Cruz Ave at Elm St
N Santa Cruz south of Elm St Midblock
N Santa Cruz north of E Main St Midblock
Accessible
ParkingTLG Std.

ST-265
(Ea.)
Blue
Curb
(L.F.)
Red
Curb
(L.F.)
White
Curb
(L.F.)
School
Bus Only
Curb
Marking
(Ea.)
Green Back Bike
Lane Symbol
with Arrow
Legend TLG-Std.

TR-A (Ea.)
Green
Bike
Lane
(L.F.)
Dashed
Green Bike
Lane (L.F.)
Shared
Roadway
Bicycle
Marking-TLG
Std. TR-G
(Ea.)
Blue
Reflective
Pavement
Marker
(Ea.)
Install
New 3'
Wheel
Stop
(Ea.)
Remove and
Salvage
Signs on
Existing Post
(Ea.)
Install
New Sign
on
Existing
Post (Ea.)
1 2
1,315 6
1 60
25 1 1
1 1
223 2
370 85 4
40 52 1
503 1 32
605 2
155 2
1 40 160 1
727 100 2 825 160 16 2
80 60 2
190 180

Page 7 of 8 ends
Page 191 ends

ITEM NO. 6.

Town of Los Gatos
#25-811-9901 2026 Annual Street Repair and Resurfacing
Street List
Street
Mullen Ave at University Ave
University Ave at Elm St
University Ave between Main St and Elm
St Midblock
Winchester Blvd at Albright Wy
Winchester Blvd at Knowles Dr
E Main St at Montebello Wy
University Ave at Royce St
Stacia St at Los Gatos Blvd
Magneson Loop at Los Gatos Blvd
University Ave at Bentley Ave
ADDITIVE ALTERNATE 1:

HILL TOP DR

WOODED VIEW DR

WOODED VIEW DR
Accessible
ParkingTLG Std.

ST-265
(Ea.)
Blue
Curb
(L.F.)
Red
Curb
(L.F.)
White
Curb
(L.F.)
School
Bus Only
Curb
Marking
(Ea.)
Green Back Bike
Lane Symbol
with Arrow
Legend TLG-Std.

TR-A (Ea.)
Green
Bike
Lane
(L.F.)
Dashed
Green Bike
Lane (L.F.)
Shared
Roadway
Bicycle
Marking-TLG
Std. TR-G
(Ea.)
Blue
Reflective
Pavement
Marker
(Ea.)
Install
New 3'
Wheel
Stop
(Ea.)
Remove and
Salvage
Signs on
Existing Post
(Ea.)
Install
New Sign
on
Existing
Post (Ea.)
1 6

Page 8 of 8 ends
Page 192 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2026
MV
GH

PARKS AND PUBLIC WORKS
Alberto Way

STRIPING PLAN
SHEET 1 OF 2
LEGEND:
40'
ANNUAL PAVING 2025-26
LEGEND MARKINGS: N
22 550' 38 100'
Transition Begin/End
XX
XX' Striping Length
Striping Detail Type IV Arrow
12" WHITE 22
130'
10'
10'
15' 18'
18'
Type VII Arrow
Alberto Way
Hwy
9 18'
18'
MATCH
L
I
N
E
25-811-9901

Page 193 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2026
MV
GH

PARKS AND PUBLIC WORKS
Alberto Way

STRIPING PLAN
SHEET 2 OF 2
LEGEND:
40'
N ANNUAL PAVING 2025-26

MATCH LINE
XX
XX' Striping Length
Striping Detail
20'
13'
20'
13'
22 160'
22 240'
22 120'
22 40'
Alberto Way
cul-de-sac
25-811-9901

Page 194 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2026
MV
GH

PARKS AND PUBLIC WORKS
Church Street
High School Court

STRIPING PLAN
SHEET 1 OF 1
LEGEND:

XX
XX' Striping Length
Striping Detail
50'
N ANNUAL PAVING 2025-26
Mark parking T's for
6 stalls per Town's
standard detail TR-L
Mark parking T's for
6 stalls per Town's
standard detail TR-L
Mark parking T's for
7 stalls per Town's
standard detail TR-L
Mark parking T's for
10 stalls per Town's
standard detail TR-L
Mark parking T's for
1 stall per Town's
standard detail TR-L
Mark parking T's for
1 stall per Town's
standard detail TR-L
Mark parking T's for
4 stalls per Town's
standard detail TR-L
Mark parking T's for
3 stalls per Town's
standard detail TR-L
Mark parking T's for
5 stalls per Town's
standard detail TR-L
Mark parking T's for
5 stalls per Town's
standard detail TR-L
Crosswalk markings
(White) per Town
standard detail TR-I
Crosswalk markings
(Yellow) per Town
standard detail TR-I

MAIN STREET

CHURCH STREET
V
I
LLA
H
I
G
H
S
C
H
O
O
L
C
O
U
RT
8'

9.5'

9.5'
8'
8'
13'
13'
8'
22 70'
22 50'
9 70'
9 450'
22 50'
STOP legend

PAGEANT
Crosswalk markings
(Yellow) per Town
standard detail TR-I
25-811-9901

Page 195 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2026
MV
GH

PARKS AND PUBLIC WORKS
Fisher Avenue

STRIPING PLAN
SHEET 1 OF 1
LEGEND:
40'
ANNUAL PAVING 2025-26
N
LEGEND MARKINGS:
38 153'
Transition Begin/End
XX
XX' Striping Length
Striping Detail Type IV Arrow
Fisher Avenue
Mitchell Avenue
10'
11'
10'
10'
11'
11'
8'

18.5'
12" WHITE
Crosswalk markings
(Yellow) per Town
standard detail TR-I
Crosswalk markings
(Yellow) per Town
standard detail TR-I
Crosswalk markings
(Yellow) per Town
standard detail TR-I
10' min.
7'
12" WHITE
12" WHITE STOP legend
Roberts East
Nino Avenue
Fisher Avenue
NOTES:

See Roberts Road East striping plan for
striping details for Roberts Road East.
27B
105'
22 130'
22 130'
38 50'
29 100'
12" WHITE
Type IV Arrow
See
Roberts
East
Plan
Existing F.C.
25-811-9901
12" WHITE
10'
11'
20'
10'
11'
15'
Existing F.C.

Existing E.P. Existing F.C.

Page 196 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2026
MV
GH

PARKS AND PUBLIC WORKS
Nino Avenue

STRIPING PLAN
SHEET 1 OF 1
LEGEND:
20'
ANNUAL PAVING 2025-26
LEGEND MARKINGS: N
22 150'
XX
XX' Striping Length
Striping Detail
Type IV Arrow
12" WHITE 38 60'
10'
15'
Type VII Arrow
L
o
s
G
ato
s Bl
v
d
18'
18'
10'
38 45'
Crosswalk markings
(Yellow) per Town
N standard detail TR-I ino Avenue
25-811-9901

Page 197 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/19/2026
MV
25-811-9901
GH

PARKS AND PUBLIC WORKS
New York Avenue
Brooklyn Avenue

STRIPING PLAN
SHEET 1 OF 1
60'
N ANNUAL PAVING 2025-26
ROW
New York Av
P
L
E
ASA
N
T
Brooklyn Av
N
Crosswalk markings
(Yellow) per Town
standard detail TR-I
ROW
LEGEND:
12" WHITE
ROW
ROW
Speed bump per Town standard
detail TR-J2. Restore bumpopening per existing conditions Restore 26 parking stalls
(4" white 9' x 17' stall)
Restore 4" red hatch
lines @ 3' (Typ.)
4" Red
Restore 9 parking stalls
(4" white 9' x 15' stall)
Restore 4 parking stalls
(4" white 9' x 15' stall)
Restore 14 parking stalls
(4" white 9' x 17' stall)
4" Red
4" Red
Restore 4 parking stalls
(4" white 9' x 15' stall)
4" Red
NOTES:

Contractor shall mark reference points for
restoring pavement markings prior to construction
or removal of existing pavement markings.

Restore pavement markings to conform existing.

Some speed bumps have drainage openings.

Contractor to mark reference points for existing
speed bumps and drainage openings prior to
construction and shall construct speed bumpsand drainage openings accordingly. 4" Red
Retore pavement markings 25'
4" Red
10'
Refresh markings
for 2 parking stalls
Restore parking T's for
4 parking stalls
Install STOP pavement
markings and a stop sign
on existing post

Page 198 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2026
MV
GH

PARKS AND PUBLIC WORKS

PARK AVENUE
Parking Lot

STRIPING PLAN
SHEET 1 OF 1
50'
N ANNUAL PAVING 2025-26
Mark 9 parking stalls
per Town's standard
detail #263, 264
Mark 1 parking stall
per Town's standard
detail #263, 264 Mark 1 ADA parking stall per Town's
standard detail #265
Mark 9 parking stalls
per Town's standard
detail #263,264
Mark 4 parking stalls
(45° angle parking)
per Town's standard
detail #263, 264
4" white hatch lines
at 4-foot spacing
Mark 16 parking stalls
per Town's standard
detail #263, 264
12" white at 1' from parking
stall with employee permit
parking stencil per Detail A
EMPLOYEE PERMIT REQUIRED MON-SAT 9AM-6PM
18' approx.

Detail A - Employee Permit Parking Stencil
Detail A
Detail A
Detail A
6"
3"3"
Park Ave
M
a
i
n
St
re
et
Park Ave
18'+
25-811-9901
LEGEND:

STOP legend
12" White

Page 199 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/18/2026
MV
GH

PARKS AND PUBLIC WORKS
Roberts Road East

STRIPING PLAN
SHEET 1 OF 1
50'
ANNUAL PAVING 2025-26 N
2 500'
38 60'
Type IV Arrow
Fisher
Av
B
l
s
s
o
m
H
i
l
l
R
o
a
d
18'
2'
10'
10' 10'
11'
11'
10'
20'
STOP legend
Roberts Road East
Roberts Road East
40'
20'
20'
Green Back Bike Lane Symbol
6'-6" 6' 5'
Transition Begin/End
LEGEND:

XX
XX' Striping Length
Striping Detail
XX
XX'G G as Green Back
Striping Detail 22'
45°
4" White Diagnal
Buffer Hatching Detail
10'10'
4' 10' 6'
20'
10'
10'
20'
10'
varies
19'
19' 80'
20'
10'+
29 80'
22 40'
22 140'
Crosswalk markings
(Yellow) per Town
standard detail TR-I
Type IV Arrow
LEGEND MARKINGS:

Bike Sharrow
(Centered in travel lane)
22 275'
4" white at 5' spacing
12" WHITE
Crosswalk markings
(Yellow) per Town
standard detail TR-I M
AT
C
H
L
I
N
E
12" WHITE
M
AT
C
H
L
I
N
E
12" WHITE 38 110'
22 60'
39 180'
39 180'G
38 22 240'
80'
38 80'
Crosswalk markings
(Yellow) per Town
standard detail TR-I
See Fisher Plan Sheet
See Fisher Plan Sheet
25-811-9901
39A
40'G
39A
45'G
8'
12' 15'
20'
12'
20'
George
St
Fisher
Av
Existing F.C.

Existing F.C.

Existing F.C.
12" Yellow

Page 200 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2026
MV
GH

PARKS AND PUBLIC WORKS
Wraight Avenue
Woodland Avenue

STRIPING PLAN
SHEET 1 OF 1
LEGEND:
20'
ANNUAL PAVING 2024-25
N
Transition Begin/End
XX
XX' Striping Length
Striping Detail
Wraight
Woodland
Hwy 9
LEGEND MARKINGS:

Type IV ArrowType I Arrow
22 82'
22 40'
12" WHITE
17'
8'
8'
24 40'
7'
4" YELLOW
10'
(5' Spacing)
Crosswalk markings
(white) per Town
standard detail TR-I
8'
25-811-9901

Page 201 ends

ITEM NO. 6.

SCALE:

PROJECT NO.:APPROVE:DESIGN:DATE: 3/16/2025
MV
GH

PARKS AND PUBLIC WORKS
Almond Blossom, Hill Top

STRIPING PLAN
SHEET 1 OF 1
40'
ANNUAL PAVING 2024-25
N
H
a
w
r
o
o
d
12" White Almond Blossom
LEGEND MARKINGS:

Chester
University
Chester, Ohlone, Forrest
Ohlone
Roberts
West
Forrest
Ave
Roberts West
Albert, Wooded View, Lundy
Lundy Lane
Main Street
Nino Ave
Albert
Dr
Happy Acres
Wooded
View
Wooded View
Hill Top
12" White
12" White
12" White
12" White
12" White
12" White
12" White
Chester Street Ohlone Court Forrest Avenue Wooded View Drive Almond Blossom Lane Lundy Lane Albert Drive Hill Top Drive 25-811-9901

Page 202 ends

ITEM NO. 6.

NOTES:

1. If used, install (A) for bike lane
after every intersection and at
mid-block as shown on the plans.

2. If used, install (B) at mid-block for
bike lane as shown on the plans.

3. If used, install (C) for left turn bike
lane as shown on the plans.

4. The spacing of bike lane symbols
should not be greater than 300'.

NOT TO SCALE

GREEN BACK

TOWN ENGINEER

APPROVED BY DATE
2/14/2023
STD. PLAN NO.

BIKE LANE SYMBOL TR-A
10'
5'
10'
6'6'-6"
varies
10'
10'6'-6"
varies
(A)
(B) 37'-6"
10'
4'
10'
6' 6'-6"
varies
(C) 36'-6" 26'-6"

Page 203 ends

ITEM NO. 6.

NOT TO SCALE

TOWN ENGINEER

APPROVED BY DATE
8/17/2021 YIELD LINE
STD. PLAN NO.

TR-B
24" 24" 24" 24"
±6" 10" 10" 10" ±6"
12' (lane width)
24" 24" 24" 24"
±6" 6" 6" 6" ±6"
24" 24" 24" 24"
±3" 4" 4" 4" ±3"
11' (lane width)
10' (lane width)
(direction of travel)
(direction of travel)
(direction of travel)
36"
36"
36"
6" 6"
6" 6"
6" 6"

Page 204 ends

ITEM NO. 6.

BIKE SHARROW
Example Lateral Position

TOWN ENGINEER

APPROVED BY DATE
2/16/2023
STD. PLAN NO.

TR-G
Bike Sharrow Lateral Position
(without on-street parking)
A C Notes
>=15' 4'min Consider bike lane
14' 4'
<14' Centered in lane
Curb or edge of pavement
or edgeline within 1' of curb
Lane Line
Bike Sharrow Lateral Position
(with on-street parking)
A B C Notes
>=24' 13' Consider bike lane
23' 6.5' Consider bike lane
22' 6' B=(A-10)/2
21' 5.5' B=(A-10)/2
20' 5' B=(A-10)/2
C
Reference: CA MUTCD Revision 6, March 30, 2021, Section 9C.07, Figure 9C-108 (CA), Figure 9C-111 (CA), Figure 9C-112 (CA). Also refer to Caltrans Standard Detail for Shared Roadway Bicycle Marking (Bike Sharrow). 39"

NOT TO SCALE
Bike Sharrow Lateral
Position (in left turn and
right-turn only lanes)
A B Notes
>=14' 4'min
<14' Centered in lane
39"
39"
Note: Sharrow may be used in left turn and right turn only lanes to indicate bicyclist may travel straight through an intersection.

B
A
A
B
A
B
Note: Shared Lane Marking (Sharrow) may be used in addition to or instead of the Use Full Lane sign to inform road users that bicyclists might occupy the travel lane.

Page 205 ends

ITEM NO. 6.

CENTER BARS ON

CENTER OF LANE AND
LANE DIVIDER STRIPE.

LEADING EDGE OF CROSSWALK

EVEN WITH LINE BETWEEN

MIDPOINTS AT GUTTER LINE OF
ASSOCIATED CURB RETURNS.

NOT TO SCALE
24"

TOWN ENGINEER

APPROVED BY DATE
2/14/2023

HIGH VISIBILITY

CROSSWALK

MARKING
STD. PLAN NO.

TR-I

PAINTING OF THE CROSSWALK SHALL MEET
CALTRANS' STANDARD SPECIFICATIONS.

Page 206 ends

ITEM NO. 6.

TOWN ENGINEER

APPROVED BY DATE ON-STREET

PARKING T

STRIPING DETAIL
STD. PLAN NO.
2/16/2023
TR-L

Page 207 ends

ITEM NO. 6.

NOT TO SCALE

TOWN ENGINEER

APPROVED BY DATE
Stop Lines at Intersections
Example Layout
STD. PLAN NO.

TR-N STOP
8' Sidewalk STOP
5' * (2)
(1) - With ADA ramp
Face of curb or
edge of pavement
(Typical)
(2) - No ADA ramp, with sidewalk
(3) - No ADA ramp, no sidewalk Sidewalk
* - 5' or as directed by Engineer
*** - Conform existing striping,
centered in travel way, or as
directed by Engineer
5' * (1)
10' ** (3)
STOP
STOP (4) - With crosswalk markings
Cases:

Centerline ***
** - 10' or as directed by Engineer
4/10/2024
5' * (4)
****
**** - 20' red curb before any marked
or unmarked crosswalk or
15' red curb of any crosswalk
with curb extension
CA Vehicle Code Chapter 9 Stopping, Standing and Parking, Section 22500.(n) Reference: CA MUTCD March 10, 2023, Section 3B.16 Stop and Yield Lines

Page 208 ends

ITEM NO. 6.

Villa Hermosa Sidewalk Required
Downtown Commercial Areas
LEGEND
Mul en Av Mul en Av W. Main Street Bean
et Elm St Ave Grays Ln Grays Ln Grays Ln Grays Ln rays Ln Grays Ln ra G sy Ln Grays Ln Grays Royce St Royce StRoyce StRoyce StRoyce St
yce S
Royce StRoyce StRoyce St
yce Styce Ro S
Royce S
s n
t
Ave Brooklyn Brookly
Street Church St CIVIC
rookly
B
Ave Brooklyn Brookly
Brookly
Miles New York
Los Gatos - Saratoga RoadLos Gato Los Gato Almendra Ave. Bachman Ave. Bach man Ct. Ave Towne Terr Chester St
Andrews St
To TerrRiviera Dr

Page 209 ends

ITEM NO. 6.
(min.) lamp black per cubic yard.

2. All concrete shall be Class "A", per Caltrans specifications, with 1 lb.

1. See Std. Detail 225 for Villa Hermosa sidewalk areas.

Install tooled score line 12 inches from panel edges.

Install tree grates.

NOTES:

CROSSWALK 10'
• • • •• ••• ••• • •• •••• • •• • •••• • • •• • • •• • • • ••• •• • • • • • •• • •• • • • ••• • •• •••••••••••••••••••••••••••••••••••••••••••• • • ••• •• •• • •••• • ••• ••• • ••••• • • •• ••• •• • • • •• •• •••• •• • •••• •• •• •••• • • •••••••••••••••••••••••••••••••••••••••••••••• "Villa Hermosa" theme: Depress concrete slabe to receive brick strips

2. Expansion joints as shown on plans.

1. Mortar joints between bricks to be 3/8".

NOTES:

FACE OF CURB

3. ALL WORK SHALL CONFORM TO CURRENT A.D.A. REQUIREMENTS. 1'-0 1/4" SEE STD. PLAN 216

CONCRETE SIDEWALK

TOOLED JOINT

EXPANSION JOINT
MORTAR JOINTS, TYP. " 1 R4
8"

SCORE JOINT DETAIL- TYPICAL
NOTE:

All new paving to be "Villa Hermosa" as shown in this
detail with the following exceptions:

A. Additional score lines at
as shown in detail
4" PEDESTRIAN
8" DRIVEWAY
• • •••• 2"
1/2"
• • ••••
3/8"
45 degrees to be added
below.

SEE STD. PLAN 226
• • • •• ••• ••• • •• •••• • •• • •••• • • •• • • •• • • • ••• •• • • • • • •• • •• • • • ••• • •• •••••••••••••••••••••••••••••••••••••••••••• • • ••• •• •• • •••• • ••• ••• • ••••• • • •• ••• •• • • • •• •• •••• •• • •••• •• •• •••• • • ••••••••••••••••••••••••••••••••••••••••••••••

Page 210 ends

ITEM NO. 6.



CONCRETE
POUR
36"
7/16" PUNCHED

KNOCKOUTS

TWO OPPOSITE
SIDES FROM 7'
ABOVE

SIDEWALK
TAMPER

PROOF DRIVE

RIVET (TYP)
18"
7'-
0" MI
N
(SEE STD. PLAN 448
SQ. TUBE SLEEVE
SQ. TUBE ANCHOR

FILLET WELD ALL AROUND
2 1/2" x 2 1/2" x 12 GA
2 1/4" x 2 1/4" x 12 GA

END CUT

PENETRATOR

FOR SIGN POST NOTES)

DRIVE RIVETS
2 TAMPER PROOF
6"

STEEL POST
1 3/4" SQ. GALVANIZED
6" MIN.

SIGN
D
SIGN
30" SELE
CT P
U
N
CHED
ON B
OTH
SIDE
S

SIGN INSTALLATION
DETAIL
E
SIGN

 
 

  Page 211
ITEM NO. 6.

PER M.U.T.C.D.

INSTALLATION.

NOTES:

SHALL BE AS SHOWN ON THE PLANS AND
THE NEAR EDGE OF SIGN. SIGN LOCATION CLEARANCE FROM THE FACE OF CURB TO GRADE, OR TOP OF CURB, AND A 2' LATERAL

THE NEAR EDGE OF SIGN TO THE SIDEWALK
2 SIGNS SHALL HAVE A MIN. HEIGHT OF 7' FROM

CORE DRILLED BEFORE ATTEMPTING SIGN
1 SIDEWALKS AND PAVED AREAS SHALL BE
EQUIVALENT. POST SHALL BE POWDER-COATED BLACK. (ASTM A70 GRADE 33) OR APPROVED SELECT PUNCH TYPE GALVANIZED STEEL 4 ALL TUBING MATERIAL SHALL BE "ULTI-MATE"
a. REGULATORY AND WARNING SIGNS SHEETING
BY 3M TRAFFIC CONTROL MATERIALS DIVISION.
3 REFLECTIVE SHEETING SHALL BE MANUFACTURED
SHALL BE 3M DIAMOND GRADE VIP TYPE
MATERIAL OR EQUIVALENT. SIZE OF SIGNS SHALL BE NO
LESS THAN 30x30 UNLESS SPECIFIED BY THE TOWN
ENGINEER.

SIGN POST NOTES:

CONFORMING TO STANDARD SPECIFICATIONS FOR STEEL
5 TUBING SHALL BE ROLL FORMED FROM STEEL
SHEET, A.S.T.M. DESIGNATION A653-94, STRUCTURAL QUALITY, GRADE 50 MODIFIED TO GRADE 55.

TREATMENT FOR ENHANCED CORROSION PROTECTION.
6 MATERIAL SHALL BE HOT-DIP GALVANIZED (ZINC COATED),
COATING DESIGNATION G-90, WITH ADDED CHEMICAL
(

AND WELDED SO AS THE WELD FLASH DOES NOT
TUBING, CAREFULLY FORMED FROM 14 GA. STEEL SHEET
7 THE CROSS SECTION OF THE POST SHALL BE SQUARE
INTERFERE WITH THE TELESCOPING PROPERTIES. SIZE OF
8 HOLE DIAMETER SHALL BE 7/16" (PLUS OR MINUS 1/64")
ON 1" CENTERS ON TWO OPPOSITE SIDES. HOLES SHALL BE ()

ON CENTERLINE OF EACH SIDE IN TRUE ALIGNMENT AND
OPPOSITE TO EACH OTHER. TOLERANCE ON THE HOLE SPACING IS PLUS OR MINUS 1/8" IN 20'. FIRST SET OF HOLES SHALL BE 1/2" FROM THE TOP OF THE ANCHOR. ANCHOR SHALL HAVE EITHER 6 OR 12 SETS OF HOLES. THE BOTTOM OF THE ANCHOR SHALL HAVE A PENETRATOR POINT.

POST SHALL BE 1.75" x 1.75".
9 CONCRETE SHALL BE POURED AROUND POST.

 
 



Page 212 ends

ITEM NO. 6.

NOT TO SCALE
NOTES:

1. THESE DIMENSIONS SHALL BE USED WHEN OVERHANG FROM FRONT VEHICLE WHEEL IS PRESENT.

2. ALL STRIPING SHALL COMPLY WITH "OFF-STREET PARKING DOUBLE STRIPE" DETAIL 264 AND "ACCESSIBLE PARKING" DETAIL 265.

3. ALL OFF-STREET PARKING SHALL COMPLY WITH SECTION 29.10.155 OF THE LOS GATOS TOWN CODE.

4. WHEEL STOPS ARE NOT PERMITTED. CONTINUOUS CURBING MAY BE USED.

Page 213 ends

ITEM NO. 6.

NOTES:

1. ALL OFF-STREET PARKING SHALL COMPLY WITH SECTION 29.10.155 OF THE LOS GATOS TOWN CODE.

NOT TO SCALE

Page 214 ends

ITEM NO. 6.

Page 215 ends

ITEM NO. 6.

NOTES:

1. ACCESSIBLE PARKING SPACES SERVING A PARTICULAR BUILDING SHALL BE LOCATED ON THE

SHORTEST ACCESSIBLE ROUTE OF TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE ENTRANCE. IN PARKING FACILITIES THAT DO NOT SERVE A PARTICULAR BUILDING, ACCESSIBLE

PARKING SHALL BE LOCATED ON THE SHORTEST ACCESSIBLE ROUTE OF TRAVEL TO AN ACCESSIBLE PEDESTRIAN ENTRANCE OF THE PARKING FACILITY.

2. ONE IN EVERY EIGHT ACCESSIBLE OFF-STREET PARKING STALLS, BUT NOT LESS THAN ONE, SHALL BE SERVED BY AN ACCESSIBLE AISLE OF 8' MIN WIDTH AND SHALL BE SIGNED VAN ACCESSIBLE. THE R99A "VAN ACCESSIBLE" SIGN SHALL BE MOUNTED BELOW THE R99 "ISA PARKING" SIGN.

3. IN EACH PARKING STALL, A CURB OR BUMPER SHALL BE PROVIDED AND LOCATED TO PREVENT ENCROACHMENT OF VEHICLES OVE RTHE REQUIRED WIDTH OF WALKWAYS. PARKING STALLS

SHALL BE SO LOCATED THAT PERSONS WITH DISABILITIES ARE NOT COMPELLED TO WHEEL OR WALK BEHIND PARKED VEHICLES OTHER THAN THEIR OWN.

4. SURFACE SLOPES OF ACCESSIBLE OFF-STREET PARKING STALLS SHALL BE THE MINIMUM POSSIBLE AND SHALL NOT EXCEED 2% IN ANY DIRECTION.

5. TABLE A SHALL BE USED TO DETERMINE THE REQUIRED NUMBER OF ACCESSIBLE PARKING STALLS IN ANY PARKING LOT OR GARAGE.

6. WHERE R99 "ISA PARKING" OR R99A "vAN ACCESSIBLE" SIGNS ARE INSTALLED ON SIDEWALKS OR OTHER PATHS OF TRAVEL, THE BOTTOM OF THE SIGN PANEL SHALL BE A MINIMUM OF 6'8" ABOVE THE SURFACE OF THE SIDEWALK OR PATH.

7. CURB RAMPS SHALL CONFORM TO THE STANDARD DETAIL 220-222.

8. BUILDING PERMIT(S) REQUIRED OFR NEW AND RESTRIPING OF EXISTING PARKING LOTS.

9. THE WORDS "NO PARKING" SHALL BE PAINTED IN WHITE LETTERS NO LESS THAN 12" HIGH AND LOCATED SO THAT IT IS VISIBLE TO TRAFFIC ENFORCEMENT OFFICIALS.

10. A R100B SIGN SHALL BE POSTED IN A CONSPICUOUS PLACE AT EACH ENTRANCE TO OFF- STREET PARKING FACILITIES OR IMMEDIATELY ADJACENT TO AND VISIBLE FROM EACH STALL.

THE SIGN SHALL INCLUDE THE ADDRESS WHERE THE TOWED VEHICLE MAY BE RECLAIMED AND THE TELEPHONE NUMBER OF THE LOCAL TRAFFIC LAW ENFORCEMENT AGENCY.

11. WHERE A SINGEL (NON-VAN) ACCESSIBLE PARKING SPACE IS PROVIDED, THE LOADING AND

UNLOADING ACCESS AISLE SHALL BE ON THE PASSENGER SIDE OF THE VEHICLE AS THE VEHICLE IS GOING FORWARD INTO THE PARKING SPACE.

12. WHERE A VAN ACCESSIBLE PARKING SPACE IS PROVIDED, THE LOADING AND UNLOADING ACCESS AISLE SHALL BE 8' WIDE MINIMUM, AND SHALL ONLY BE ON THE PASSENGER SIDE OF THE VEHICLE AS THE VEHICLE IS GOING FORWARD INTO THE PARKING SPACE.

Page 216 ends

ITEM NO. 6.

Page 217 ends

ITEM NO. 6.

Page 218 ends

ITEM NO. 6.

Page 219 ends

ITEM NO. 6.

Page 220 ends

ITEM NO. 6.

Page 221 ends

ITEM NO. 6.

Page 222 ends

ITEM NO. 6.

Page 223 ends

ITEM NO. 6.

Page 224 ends

ITEM NO. 6.

Page 225 ends

ITEM NO. 6.

Page 226 ends

ITEM NO. 6.

Page 227 ends

ITEM NO. 6.

Page 228 ends

ITEM NO. 6.

Page 229 ends

ITEM NO. 6.

Page 230 ends

ITEM NO. 6.

Page 231 ends

ITEM NO. 6.

Page 232 ends

ITEM NO. 6.

Page 233 ends

ITEM NO. 6.

Page 234 ends

ITEM NO. 6.

Contract
This public works contract (“Contract”) is entered into by and between the Town of Los Gatos (“Town”) and _______________________________________ (“Contractor”), for work on the ____________________ (“Project”).

The parties agree as follows:

1. Award of Contract. In response to the Notice Inviting Bids, Contractor has submitted a Bid Proposal to perform the Work to construct the Project. On _____________, 20___, Town authorized award of this Contract to Contractor for the amount set forth in Section 4, below. Town has elected to include the following Project alternate(s) in the Contract:
______________________________________

2. Contract Documents. The Contract Documents incorporated into this Contract include and are comprised of all of the documents listed below. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, including this Contract.

2.1 Notice Inviting Bids;

2.2 Instructions to Bidders;

2.3 Addenda, if any;

2.4 Bid Proposal and attachments thereto;

2.5 Contract;

2.6 Payment and Performance Bonds;

2.7 General Conditions;

2.8 Special Conditions;

2.9 Project Plans and Specifications;

2.10 Change Orders, if any;

2.11 Notice of Potential Award;

2.12 Notice to Proceed;

2.13 Locations of Work (Appendix A); and

2.14 Standard Plans (Appendix B); and

2.15 The 2010 Caltrans Standard Specifications, as revised.

3. Contractor’s Obligations. Contractor will perform all of the Work required for the Project, as specified in the Contract Documents. Contractor must provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including all necessary labor, materials, supplies, tools, equipment, transportation, onsite facilities, and utilities, unless otherwise specified in the Contract Documents. Contractor must use its best efforts to diligently prosecute and complete the Work in a professional

Page 235 ends

ITEM NO. 6.
and expeditious manner and to meet or exceed the performance standards required by the Contract Documents.

4. Payment. As full and complete compensation for Contractor’s timely performance and completion of the Work in strict accordance with the terms and conditions of the Contract Documents, Town will pay Contractor $___________________ (“Contract Price”) for all of Contractor’s direct and indirect costs to perform the Work, including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, in accordance with the payment provisions in the General Conditions.

5. Time for Completion. Contractor will fully complete the Work for the Project, meeting all requirements for Final Completion, within 60 Working Days from the start date set forth in the Notice to Proceed (“Contract Time”). By signing below, Contractor expressly waives any claim for delayed early completion.

6. Liquidated Damages. As further specified in Section 5.4 of the General Conditions, if Contractor fails to complete the Work within the Contract Time, Town will assess liquidated damages in the amount of $XXXX per day for each day of unexcused delay in achieving Final Completion, and such liquidated damages may be deducted from Town’s payments due or to become due to Contractor under this Contract.

7. Labor Code Compliance.

7.1 General. This Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in Article 9 of the General Conditions.

7.2 Prevailing Wages. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are available online at http://www.dir.ca.gov/DLSR.

7.3 DIR Registration. Town may not enter into the Contract with a bidder without proof that the bidder and its Subcontractors are registered with the California Department of Industrial Relations to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.

8. Workers’ Compensation Certification. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that

Page 236 ends

ITEM NO. 6.
code, and I will comply with such provisions before commencing the performance of the Work on this Contract.”

9. Conflicts of Interest. Contractor, its employees, Subcontractors, and agents may not have, maintain, or acquire a conflict of interest in relation to this Contract in violation of any Town ordinance or requirement, or in violation of any California law, including Government Code § 1090 et seq., or the Political Reform Act, as set forth in Government Code § 81000 et seq. and its accompanying regulations. Any violation of this Section constitutes a material breach of the Contract.

10. Independent Contractor. Contractor is an independent contractor under this Contract and will have control of the Work and the means and methods by which it is performed. Contractor and its Subcontractors are not employees of Town and are not entitled to participate in any health, retirement, or any other employee benefits from Town.

11. Notice. Any notice, billing, or payment required by or pursuant to the Contract Documents must be made in writing, signed, dated, and sent to the other party by personal delivery, U.S. Mail, a reliable overnight delivery service, or by email as a PDF file.

Notice is deemed effective upon delivery, except that service by U.S. Mail is deemed effective on the second working day after deposit for delivery. Notice for each party must be given as follows:

Town:

Finance Department
Town of Los Gatos
110 E. Main St.

Los Gatos, CA 95030
[email protected]
Copy to: Janice Chin, Assistant Engineer
[email protected]
Contractor:

Name: _____________________________________
Address: ___________________________________
Town/State/Zip: _______________________________
Phone: _____________________________________
Attn: _______________________________________
Email: ______________________________________
Copy to: ____________________________________

12. General Provisions.

Page 237 ends

ITEM NO. 6.

12.1 Assignment and Successors. Contractor may not assign its rights or obligations under this Contract, in part or in whole, without Town’s written consent. This Contract is binding on Contractor’s and Town’s lawful heirs, successors and permitted assigns.

12.2 Third Party Beneficiaries. There are no intended third party beneficiaries to this Contract.

12.3 Governing Law and Venue. This Contract will be governed by California law and venue will be in the Santa Clara County Superior Court, and no other place.

Contractor waives any right it may have pursuant to Code of Civil Procedure § 394, to file a motion to transfer any action arising from or relating to this Contract to a venue outside of Santa Clara County, California.

12.4 Amendment. No amendment or modification of this Contract will be binding unless it is in a writing duly authorized and signed by the parties to this Contract.

12.5 Integration. This Contract and the Contract Documents incorporated herein, including authorized amendments or Change Orders thereto, constitute the final, complete, and exclusive terms of the agreement between Town and Contractor.

12.6 Severability. If any provision of the Contract Documents is determined to be illegal, invalid, or unenforceable, in whole or in part, the remaining provisions of the Contract Documents will remain in full force and effect.

12.7 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Contractor certifies, by signing below, that it is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.

12.8 Authorization. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents, and that this Contract is legally binding on that party. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporations Code § 313. [Signatures are on the following page.]

Page 238 ends

ITEM NO. 6.

The parties agree to this Contract as witnessed by the signatures below:

TOWN: Approved as to form:
s/_______________________________ s/__________________________________ ________________________________ ___________________________________ Name, Title Name, Title
Date: ___________________________ Date: ______________________________ Attest:
s/_______________________________
_________________________________
Name, Title
Date: ___________________________
CONTRACTOR: ___________________________________________________ Business Name
s/_______________________________ Seal:
_________________________________
Name, Title
Date: ____________________________
Second Signature (See Section 12.8):
s/_______________________________
_________________________________
Name, Title
Date: ____________________________
___________________________________________________
Contractor’s California License Number(s) and Expiration Date(s)

END OF CONTRACT

Page 239 ends

ITEM NO. 6.

Blueprint for a Clean Bay
Best Management Practices to Prevent Stormwater
Pollution from Construction-Related Activities
The Bay Area Stormwater Management Agencies Association (BASMAA), a consortium of Bay Area municipalities from Alameda, Contra Costa, Marin, San Mateo, Santa Clara, Solano, and Sonoma Counties, developed this booklet as a resource for all general contractors, home builders, and subcontractors working on construction sites.

Page 240 ends

ITEM NO. 6.
1 Introduction...............................................................................................................................

Stormwater Pollution.....................................................................................................

Storm Drain System
Pollution From Construction Sites
Adverse Effects from Stormwater Pollution
Requirements for Dischargers.............................................................................

Municipal Stormwater Program
Projects Equal To Or Greater Than 1 Acre
California State Water Resources Control Board General Permit Notice of Intent (NOI)
Storm Water Pollution Prevention Plan (SWPPP)
Projects Less Than 1 Acre
General Best Management Practices............................................................

Specific Best Management Practices
Erosion Prevention and Sediment Control ..................................................

Prevent erosion
Control sediment
General Site Maintenance.........................................................................................

Prevent spills and leaks
Clean up spills immediately after they happen
Store materials under cover
Cover and maintain dumpsters
Collect and properly dispose of paint removal wastes
Clean up paints, solvents, adhesives, and cleaning
solutions properly
Keep fresh concrete and cement mortars out of gutters,
storm drains, and creeks
Service and maintain portable toilets
Dispose of cleared vegetation properly
Demolition Waste Management..........................................................................

Make sure all demolition waste is properly disposed of
Roadwork and Pavement Construction....................................................

Plan roadwork and pavement construction to avoid stormwater pollution Contaminated Ponded Stormwater, Groundwater,
and Soil Guidance .........................................................................................................

Look for ponded stormwater, groundwater, and/or soil contamination Take appropriate action

CONTENTS
2 2
3 3
4 6
9 9
10

Page 241 ends

ITEM NO. 6.
2 S
tormwater pollution is a national environmental
problem. In California, stormwater runoff is a
major source of water pollution. To help combat
the problems of stormwater pollution, federal and state governments have developed a program for monitoring and permitting discharges to municipal storm drain systems, creeks, and water bodies such as San
Francisco Bay.

Municipalities in the Bay Area are required by the
Clean Water Act to develop stormwater management
programs that include requirements for construction
activities. Your construction project will need to
comply with local municipal requirements. If your
construction activity will disturb one acre or more, you must also obtain coverage under the General
Construction Activity Permit (see Requirements for
Dischargers).

Blueprint for a Clean Bay is an introductory guide to
stormwater quality control on construction sites. It
contains several principles and techniques that you
can use to help prevent stormwater pollution. BASMAA
has developed this booklet as a resource for all general contractors, home builders, and subcontractors working on construction sites.

Blueprint for a Clean Bay is not a design manual or a
Stormwater Pollution Prevention Plan (SWPPP) (see
Requirements for Dischargers). For more information
on the General Permit, designing stormwater quality
controls, or producing a Stormwater Pollution
Prevention Plan, please refer to:
❏ the California Stormwater Quality Association
(CASQA) Stormwater Best Management Practice
Handbook for Construction,
❏ the Regional Water Quality Control Board’s
(RWQCB) Guidelines for Construction Projects, or
❏ consult your local program or the State Water
Resources Control Board (SWRCB) (see below).

Please note that this booklet is concerned only with
the management of construction sites and activities
during construction.

Storm Drain System
Stormwater or runoff from sources like sprinklers and
hoses flows over the ground into the storm drain
system. In the San Francisco Bay Area, storm drain
systems consist of gutters, storm drains, underground
pipes, open channels, culverts, and creeks. Storm
drain systems are designed to drain directly to the
Bay, Delta, or Pacific Ocean with no treatment.

Pollution From Construction Sites
Stormwater runoff is part of a natural hydrologic process. However, land development and construction activities can significantly alter natural drainage patterns and pollute stormwater runoff. Runoff picks up pollutants as it flows over the ground or paved areas
and carries these pollutants into the storm drain
system. Common sources of pollutants from construction sites include: sediments from soil erosion; construction materials and waste (e.g., paint, solvents, concrete, drywall); landscaping runoff containing fertilizers and pesticides; and spilled oil, fuel, and other fluids from construction vehicles and heavy equipment.

Adverse Effects from Stormwater
Pollution
Stormwater pollution is a major source of water pollution in California. It can cause declines in fisheries, damage habitats, and limit water recreation activities.

Stormwater pollution poses a serious threat to the
overall health of the ecosystem.

For more information on stormwater requirements, call the State Water Resources Control Board’s Stormwater Information Line at (916) 341-5537 or your local program.

Introduction Stormwater Pollution

Page 242 ends

ITEM NO. 6.
3 For more information on the General Permits, call the State Water Resources Control Board’s Stormwater Information Line at (916) 341-5537 or your local program.

Municipal Stormwater Program
Municipalities in the Bay Area are required by federal
regulations to develop programs to control the discharge of pollutants to the storm drain system, including the
discharge of pollutants from construction sites and areas of new development or significant redevelopment. As a
result, your development and construction projects are
subject to new requirements designed to improve
stormwater quality such as, expanded plan check and
review, contract specifications, stormwater treatment
measures, runoff monitoring, and increased site
inspection. For more information on municipal requirements, please contact the municipal representative listed on the back cover of this booklet.

Projects Equal To Or Greater
Than 1 Acre
If your construction activity will disturb one acre or
more, you must obtain coverage under the General
Construc-tion Activity Storm Water Permit (General
Construction Permit) issued by the SWRCB for
stormwater discharges associated with construction
activity. To obtain coverage under the General Permit, a Notice of Intent (NOI) must be filed with the SWRCB.

The General Construction Permit requires you to
prepare and carry out a “Stormwater Pollution
Prevention Plan” or SWPPP. Your SWPPP must identify
appropriate stormwater pollution prevention measures or best management practices (BMPs), like the ones
described in this booklet, to reduce pollutants in
stormwater discharges from the construction site both
during and after construction is complete. A best
management practice or BMP is defined as any program,
technology, process, practice, operating method,
measure, or device that controls, prevents, removes, or reduces pollution. The General Permit also requires
permanent stormwater quality controls (see BASMAA’s
Start at the Source manual and CASQA’s BMP
Handbooks New Development and Redevelopment for
examples). You should keep a copy of your SWPPP
readily available onsite throughout construction.

Projects Less Than 1 Acre
If your project is less than one acre, you may still need to use BMPs to comply with local municipal requirements.

Check with the local stormwater program (listed on back cover), or planning or engineering department for details.

General Practices
The following are some general principles that can
significantly reduce pollution from construction
activity and help make compliance with stormwater
regulations easy:
❏ Identify all storm drains, drainage swales and
creeks located near the construction site and make
sure all subcontractors are aware of their locations
to prevent pollutants from entering them.
❏ Clean up leaks, drips, and other spills immediately
so they do not contact stormwater.
❏ Refuel vehicles and heavy equipment in one
designated location on the site and take care to
clean up spills immediately.
❏ Wash vehicles at an appropriate off-site facility. If equipment must be washed on-site, do not use
soaps, solvents, degreasers, or steam cleaning
equipment, and prevent wash water from entering
the storm drain. If possible, direct wash water to a
low point where it can evaporate and/or infiltrate.
❏ Never wash down pavement or surfaces where
materials have spilled. Use dry cleanup methods
whenever possible.
❏ Avoid contaminating clean runoff from areas
adjacent to your site by using berms and/or
temporary or permanent drainage ditches to divert
water flow around the site. Reduce stormwater
runoff velocities by constructing temporary check
dams and/or berms where appropriate.
❏ Protect all storm drain inlets using filter fabric
cloth or other best management practices to
prevent sediments from entering the storm
drainage system during construction activities.
❏ Keep materials out of the rain — prevent runoff pollution at the source. Schedule clearing or heavy earth moving
activities for periods of dry weather. Cover exposed piles of soil, construction materials and wastes with plastic sheeting or temporary roofs. Before it rains, sweep and remove materials from surfaces that drain to storm
drains, creeks, or channels.

Requirements for Dischargers Best Management Practices

Page 243 ends

ITEM NO. 6.
4 ❏ Keep pollutants off exposed surfaces. Place trash
cans around the site to reduce litter. Dispose of
non-hazardous construction wastes in covered
dumpsters or recycling receptacles.
❏ Practice source reduction — reduce waste by ordering only the amount you need to finish the job. ❏ Do not over-apply pesticides or fertilizers and
follow manufacturers instructions for mixing and
applying materials.
❏ Recycle leftover materials whenever possible.

Materials such as concrete, asphalt, scrap metal,
solvents, degreasers, cleared vegetation, paper,
rock, and vehicle maintenance materials such as
used oil, antifreeze, batteries, and tires are
recyclable (check with the local planning or
building department for more information).
❏ Dispose of all wastes properly. Materials that cannot be reused or recycled must be taken to an appropriate
landfill or may require disposal as hazardous waste.

Never throw debris into channels, creeks or into
wetland areas. Never store or leave debris in the
street or near a creek where it may contact runoff.
❏ Illegal dumping is a violation subject to a fine
and/or time in jail. Be sure that trailers carrying
your materials are covered during transit. If not,
the hauler may be cited and fined.
❏ Train your employees and inform subcontractors
about the stormwater requirements and their own
responsibilities.

Specific Practices
Following is a summary of specific best management
practices for erosion and sediment control and
contractor activities. For more information on erosion
and sediment control BMPs and their design, please
refer to the RWQCB Erosion and Sediment Control
Field Manual (August 2002), the CASQA Stormwater
Best Management Practice Handbook for Construction
(January 2003), and the Association of Bay Area
Governments (ABAG) Manual of Standards for Erosion
& Sediment Control Measures (May 1995).

Erosion Prevention and
Sediment Control
Prevent erosion
Soil erosion is the process by which soil particles are removed from the land surface, by wind, water and/or
gravity. Soil particles removed by stormwater runoff
are pollutants that when deposited in local creeks,
lakes, Bay or Delta, can have negative impacts on
aquatic habitat. Exposed soil after clearing, grading, or excavation is easily eroded by wind or water. The
following practices will help prevent erosion from
occurring on the construction site:
❏ Plan the development to fit the topography, soils,
drainage pattern and natural vegetation of the site.
❏ Delineate clearing limits, easements, setbacks,
sensitive or critical areas, trees, drainage courses,
and buffer zones to prevent excessive or
unnecessary disturbances and exposure.
❏ Phase grading operations to reduce disturbed
areas and time of exposure.
❏ Avoid excavation and grading during wet weather.
❏ Limit on-site construction routes and stabilize
construction entrance(s) and exit(s).
❏ Remove existing vegetation only when absolutely
necessary.
❏ Construct diversion dikes and drainage swales to
channel runoff around the site.
❏ Use berms and drainage ditches to divert runoff
around exposed areas. Place diversion ditches
across the top of cut slopes.

Best Management Practices

Page 244 ends

ITEM NO. 6.
❏ Plant vegetation on exposed slopes. Where
replanting is not feasible, use erosion control
blankets (e.g., jute or straw matting, glass fiber or
excelsior matting, mulch netting).
❏ Consider slope terracing with cross drains to
increase soil stability.
❏ Cover stockpiled soil and landscaping materials
with secured plastic sheeting and divert runoff
around them.
❏ As a back-up measure, protect drainage courses,
creeks, or catch basins with fiber rolls, silt fences,
sand/gravel bags and/or temporary drainage swales.
❏ Once grading is completed, stabilize the disturbed
areas using permanent vegetation as soon as possible.

Use temporary erosion controls until vegetation is
established.
❏ Conduct routine inspections of erosion control
measures especially before and immediately after
rainstorms, and repair if necessary.

Control sediment
Sedimentation is defined as the process of depositing
sediments carried away by runoff. Sediments
consist of soil particles, clays, sands,
and other minerals. The purpose of
sediment control practices is to remove
sediments from stormwater before they
are transported off-site or reach a
storm drain inlet or nearby creek. The
most effective sediment control
practices reduce runoff velocity and
trap or detain runoff allowing
sediments to settle out.
❏ Use terracing, rip rap, sand/gravel
bags, rocks, fiber rolls, and/or temporary vegetation on slopes to reduce runoff velocity and trap sediments.

Do not use asphalt rubble or other
demolition debris for this purpose.
❏ Use check dams in temporary
drains and swales to reduce runoff
velocity and promote sedimentation.
❏ Protect storm drain inlets from sediment-laden runoff. Storm drain inlet protection devices include
sand/gravel bag barriers, filter
fabric fences, block and gravel filters, catch basin
filter inserts, excavated drop inlet sediment traps, or a combination of these.
❏ Collect and detain sediment-laden runoff in
sediment traps (an excavated or bermed area or
constructed device) to allow sediments to settle out
prior to discharge.
❏ Use sediment controls and filtration to remove
sediments from dewatering discharges.
❏ Prevent construction vehicle tires from tracking
soil onto adjacent streets by constructing a temporary stone pad with a filter fabric underliner near the site exit where dirt and mud can be removed.
❏ When cleaning sediments from streets, driveways
and paved areas on construction sites, use dry
sweeping methods where possible. If water must
be used to flush pavement, collect runoff to settle
out sediments and protect storm drain inlets.

Note: Performance of erosion and sediment controls is dependent on proper installation, routine inspections and maintenance of the controls. Straw bale barriers are an example of a BMP that has not been as effective as expected due to improper use. Most of the BMPs described above are temporary and if left alone can quickly fall into disrepair and/or become ineffective. Routine inspections and maintenance, particularly before and after a storm event, must be part of any erosion and sediment control plan.

Best Management Practices
5 Drainage swales channel runoff around a construction site. Planting temporary vegetation on freshly graded areas, and trenching and staking fiber rolls and/or silt fences downslope are common techniques for preventing erosion and controlling sediment.

The RWQCB’s Field Manual, the CASQA Stormwater Best Management Practice Handbook for Construction, and the ABAG Manual of Standards for Erosion and Sediment Control provide specific details and design criteria for erosion and sediment control plans.

Page 245 ends

ITEM NO. 6.

General Site Maintenance
Prevent spills and leaks
Poorly maintained vehicles and heavy equipment
leaking fuel, oil, antifreeze, or other fluids on the construction site are common sources of stormwater pollution and soil contamination. Construction material spills can also cause serious problems. Careful site
planning, preventive maintenance, and good materials
handling practices can eliminate most spills and leaks. ❏ Maintain all vehicles and heavy equipment. Inspect
frequently for and repair leaks.
❏ Designate specific areas of the construction site,
well away from creeks or storm drain inlets, for
vehicle and equipment parking and routine
maintenance.
❏ Perform major maintenance, repair jobs and vehicle and equipment washing off-site when feasible, or in designated and controlled areas on-site.
❏ If you must drain and replace motor oil, radiator
coolant, or other fluids on-site, use drip pans or
drop cloths to catch drips and spills. Collect all
spent fluids, store in labeled separate containers,
and recycle whenever possible. Note that in order
to be recyclable, such liquids must not be mixed
with other fluids. Non-recycled fluids generally
must be disposed of as hazardous wastes.

Clean up spills immediately after they
happen
When vehicle fluids or materials such as paints or
solvents are spilled, cleanup should be immediate,
automatic, and routine.
❏ Sweep up spilled dry materials (e.g., cement,
mortar, or fertilizer) immediately. Never attempt to
“wash them away’’ with water, or bury them. Use
only minimal water for dust control.
❏ Clean up liquid spills on
paved or impermeable
surfaces using “dry’’
cleanup methods (e.g.,
absorbent materials like
cat litter, sand or rags).
❏ Clean up spills on dirt
areas by digging up and
properly disposing of the
contaminated soil.
❏ Report significant spills
to the appropriate spill
response agencies immediately (See reference
list on the back cover of this booklet for more
information).

Note: Used cleanup rags that have absorbed hazardous
materials must either be sent to a certified industrial laundry or dry cleaner, or disposed of through a licensed hazardous waste disposal company.
6 Make sure equipment repair area is bermed or well away from creeks and storm drains.

Clean up spills on dirt areas
by removing contaminated
soil.

Best Management Practices

Page 246 ends