Cities Index.
Agenda, second session

Lynwood City Council
June 20, 2023

Document
Agenda, second session
Meeting
June 20, 2023
Body
Lynwood City Council
Pages
871
Original file
2.2 MB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

Lynwood Lighting District Page 128 of 128 675
1 RESOLUTION NO.______________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD, DECLARING

ITS INTENTION TO ORDER THE LEVY AND COLLECTION OF ANNUAL ASSESSMENTS FOR FISCAL YEAR 2023-2024 WITHIN THE LYNWOOD LIGHTING

ASSESSMENT DISTRICT PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972 (COMMENCING WITH STREETS AND HIGHWAYS CODE SECTION 22500 ET SEQ.) AND FIXING THE TIME AND PLACE FOR HEARING PROTESTS AND OBJECTIONS AS JULY 18, 2023
WHEREAS, the City Council has ordered and the Engineer, Willdan Financial Services serving on behalf of the City of Lynwood as Assessment Engineer, has prepared and filed a report in writing containing all matters required by Council under Streets and Highways Code, Section 22565, et seq.; and
WHEREAS, said report has been presented to the City Council for consideration and has been received and approved.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY FIND, PROCLAIM, ORDER, AND RESOLVE AS FOLLOWS:

Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct, and incorporates them herein as findings and as a substantive part of this Resolution.

Section 2. Pursuant to the Landscaping and Lighting Act of 1972 commencing with Streets and Highways Code Section 22500 et seq., the City Council of the City of Lynwood hereby declares its intention to order the levy and collection of assessments against the assessable lots and parcels of land within an existing assessment district designated "Lynwood Lighting Assessment District” (the “District) for fiscal year 2023- 2024 to pay for the costs of those existing and previously proposed improvements described as:
“The installation or construction and maintenance and servicing of existing and previously proposed public lighting facilities and facilities which are appurtenant thereto or which are necessary or convenient for the maintenance or servicing thereof, including but not limited to, electric current, repair of street light standards and fixtures and incidental costs including labor, material and equipment. Such improvements constitute the maintenance and operation of sidewalks and streets, specifically, the maintenance and operation of existing and previously proposed public lighting facilities located in and along sidewalks and streets, including street lights and traffic signals, and facilities which are appurtenant thereto or which are necessary or convenient for the maintenance or operation thereof, including the cost of rent, repair, replacement, rehabilitation, fuel, power, electrical current, care, and supervision necessary to properly operate and maintain public lighting facilities and traffic signals located in and along public streets within the City; and the installation and construction of previously 676
2 proposed public lighting facilities, and facilities which are appurtenant thereto or which are necessary or convenient for the maintenance or operation thereof, which have been or are to be paid from the proceeds of revenue bonds. "The boundaries of the District are conterminous with the boundaries of the City of Lynwood as shown on the map identified as Assessment District Map No. 2017-A on file in the office of the City Engineer.

Section 3. Reference is hereby made to the report of the Engineer approved by City Council on June 20, 2023, by a resolution, and on file in the office of the City Clerk, describing the improvements made or to be made, the maintenance and servicing thereof, the boundaries of the District and any zones therein, and the proposed assessments upon assessable lots and parcels of land within the District.

Section 4. Notice is hereby given that on July 18, 2023, at the hour of 6:00 p.m. or soon thereafter, in the Council Chambers of City Hall Annex, 11350 Bullis Road, Lynwood, California, is the date, hour and place fixed for the hearing of protests and objections by the City Council to the levy and collection of the proposed assessments (existing rates) against the lots and parcels of land within the District for fiscal year 2023-2024.

Any and all persons having any protest or objection to the proposed improvements, the extent of the assessment district, or the levy and collection of the proposed assessments may appear before the City Council at said hearing and show cause why said improvements should not be carried out and the proposed assessment and diagram confirmed, all in accordance with this Resolution of Intent and the report of the City Engineer. Prior to the conclusion of the hearing, any interested person may file a written protest with the City Clerk, or, having previously filed a protest, may file a written withdrawal of protest. A written protest shall state all grounds of objection.

A protest by a property owner shall contain a description sufficient to identify the property owned by him. All interested persons shall be afforded the opportunity to hear and be heard. The City Council shall consider all oral statements and written protests or communications made or filed by an interested person.

The public hearing will be held in the City Council Chamber located at 11350 Bullis Road, Lynwood, CA 90262. The public can participate either in person, via Zoom web conference with meeting ID 835 2029 8238, or by telephone at 1-669-900-9128 or 1- 253-215-8782. If Spanish interpretation services are needed, please dial (310) 372- 7549; conference code 673120.

Information on the telephonic or videoconferencing access to the City Council Meeting may change. To receive the most updated information on whether the Public Hearing is accessible telephonically or videoconferencing; and/or changes on the phone numbers as well as access code and password, this information will be included in the July 18, 2023 Agenda. Members of the public may access this Agenda online by visiting the City of Lynwood’s website at www.lynwoodca.gov, clicking on “Agendas”, selecting “Council Meeting Agenda Packet”, and selecting “July 18, 2023 – City Council Regular Meeting 677
3 Agenda” to obtain the dial-in number and correlating access code. Members of the public may also use the following link: https://lynwoodca.gov/AgendaCenter/City- Council-2.

Section 5. The City Clerk is hereby directed to cause notice of the passage of this resolution to be given at the time and place in the form and manner provided by law.

Section 6. The proposed assessments for fiscal year 2023-2024 will remain the same and are $1.62 per foot of frontage for residentially zoned properties and $3.01 per foot of frontage for commercially zoned properties.

Section 7. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.

Section 8. This Resolution shall take full force and effect immediately upon adoption by the City Council.
678
4 PASSED, APPROVED and ADOPTED this 20th day of June, 2023. _______________________________
Oscar Flores
Mayor
ATTEST:
__________________________ _________________________________ Maria Quiñonez
City Clerk
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
__________________________ _________________________________ Noel Tapia Ernie Hernandez
City Attorney City Manager
Julian Lee
Director of Public Works
679
5 STATE OF CALIFORNIA )
)

COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a regular meeting held on the 20th day of June 2023, and passed by the following votes:

AYES:

NOES:

ABSTAIN:

ABSENT:
________________________
Maria Quiñónez, City Clerk

STATE OF CALIFORNIA )
)

COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. ____________ on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this 20th day of June 2023. ________________________
Maria Quiñónez, City Clerk
680
1 RESOLUTION NO. _____________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD APPROVING THE ENGINEER’S REPORT PREPARED PURSUANT TO CALIFORNIA STREETS AND HIGHWAYS CODE SECTION 22565 ET SEQ., AS ORDERED BY THE CITY COUNCIL ON JUNE 20, 2023, RELATING TO THE LYNWOOD LIGHTING

ASSESSMENT DISTRICT
WHEREAS, the City Council, on June 20, 2023, adopted Resolution No. -___ directing the Engineer to prepare and file with the City Clerk, a report in writing in accordance with the requirements of Streets and Highways Code, Section 22565 et. seq.; and
WHEREAS, Willdan Financial Services, as Assessment Engineer on behalf of the City of Lynwood, has prepared and filed said report with the City Clerk and the City Clerk has presented said report to this City Council for consideration.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY FIND, PROCLAIM, ORDER, AND RESOLVE AS FOLLOWS:

Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct, and incorporates them herein as findings and as a substantive part of this Resolution.

Section 2. The City Council has considered said report as filed and is hereby approved.

Section 3. Said report, including any plan and diagram 2017-A, estimates of costs and expenses and assessments shall be placed on file in the office of the City Clerk and may be examined by any interested persons.

Section 4. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.

Section 5. This Resolution shall take full force and effect immediately upon adoption by the City Council.
681
2 PASSED, APPROVED and ADOPTED this 20th day of June 2023.

________________________________
Oscar Flores
Mayor
ATTEST:
__________________________
Maria Quiñonez
City Clerk
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
__________________________ _________________________________ Noel Tapia Ernie Hernandez
City Attorney City Manager
Julian Lee
Director of Public Works
682
3 STATE OF CALIFORNIA )
)

COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a regular meeting held on the 20th day of June 2023, and passed by the following votes:

AYES:

NOES:

ABSTAIN:

ABSENT:
________________________
Maria Quiñónez, City Clerk

STATE OF CALIFORNIA )
)

COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. ____________ on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this 20th day of June 2023. ________________________
Maria Quiñónez, City Clerk
683

AGENDA STAFF REPORT

DATE:

June 20, 2023
TO:

Honorable Mayor and Members of the City Council
APPROVED BY:

Ernie Hernandez, City Manager
PREPARED BY:

Julian Lee, Director of Public Works
SUBJECT:

AWARD OF CONTRACT TO DBX, INC. FOR THE TRAFFIC SIGNAL

IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY
AND RUTH AVENUE FY 2023-2024 PROJECT NO. 4011.68.115
Agenda Item # 10.3.

Recommendation:

Staff recommends that the City Council adopt the attached resolution entitled: “A

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD AWARD OF CONTRACT TO DBX, INC. FOR THE TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY AND RUTH AVENUE FY 2023-2024 PROJECT NO. 4011.68.115; AUTHORIZING THE CITY MANAGER TO APPROVE AGREEMENT

AMENDMENTS RELATED TO THE PROJECT AND AUTHORIZING THE MAYOR TO EXECUTE THE AGREEMENT.”
Background:

The City of Lynwood conducted a traffic signal analysis at the intersection of Imperial Highway and Ruth Avenue and found that the intersection warrants a new traffic signal. Plans and specifications were prepared for the design and presented to the City Council which received approval on April 18, 2023.

The work to be performed consists of furnishing all labor, material, equipment, services, and incidentals required for traffic signals placement including installation of conduits, pull boxes, signal heads, sensor units, signal controller, pedestrian countdown heads, intersection lighting, pedestrian push buttons, traffic signal poles, traffic striping, markings, signing, and traffic control; hauling and disposal; and construction of curb ramps.

City Council City Council Regular Meeting 684
Discussion and Analysis:

On April 18, 2023 staff received approval of plans and specifications and authorization to distribute a Notice Inviting Bids for Traffic Signal Improvements at the intersection of Imperial Highway and Ruth Avenue.

In accordance with the Lynwood Municipal Code (LMC) Chapter 6 Subsection 6-3, on May 8, 2023, the Notice Inviting Bids (NIB) was advertised on the City’s website (PlanetBids). The Bid opening took place on the PlanetBids Platform on Wednesday, May 31, 2023, at 10:00 am (PST). The following six (6) bids were received:

Bidder
Bid

1. DBX, Inc.
$623,363.00

2. Comet Electric, Inc.
$649,648.00

3. California Professional Engineering, Inc.
$655,540.10

4. Elecnor Belco Electric, Inc.
$674,703.00

5. Calpromax Engineering
$698,529.00

6. Select Electric, Inc.
$717,500.00

An analysis of all bidders was conducted, including a review of their bid schedule, license, references, and required documents. DBX, Inc. was the apparent lowest responsible bidder with a low base bid of $623,363.00. The bidder’s previous performance reveals that the contractor has the necessary experience and the contractor’s license for this type of project.

It is estimated that this project will take approximately one hundred and sixty (160) calendar days to complete the work set forth in the specifications. Upon authorization, staff will circulate the contract documents, set up a pre-construction meeting, and schedule work to commence.

Bid Items and Construction Budget:

The table below is the total proposed cost for the bid items provided by DBX, Inc.:

City Council City Council Regular Meeting 685

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY AND RUTH AVENUE FY 2023-2024 PROJECT NO. 4011.68.115 Bid Schedule
Amount
Mobilization/ Demobilization (Not to exceed 3% of total of all other prime contract Bid Items)
$ 9,500.00
Traffic Control
$13,650.00
Remove and Native Soil (unclassified Excavation) to Provide Clear Depth for improvements
$1,295.00
Sawcut and Remove Existing Concrete Sidewalk
$1,296.00
Sawcut and Remove Existing Concrete Curb and Gutter
$1,952.00
Sawcut and Remove Existing Concrete Curb Ramp
$2,420.00
Prune Overhead Tree Branches
$5,500.00
Remove Existing Tree
$1,320.00
Remove and Salvage Existing Sign and Post
$250.00
Remove Existing streetlight, Footing, Pull Boxes, Conduits and Wires
$5,000.00
Remove Existing Flashing Beacon Post assembly, Footing, Pull Boxes, Conduits and Wires
$2,500.00
Protect Existing Flashing Beacon Assembly, Remove Flashing Beacons, and Replace School Crossing sign with an approved Internally Illuminated Signal Ahead sign.
$5,000.00
Relocate Existing Water Valve
$18,700.00
Relocate Existing Fire Hydrant Assembly and Service Line $24,200.00
Construct Concrete Sidewalk (4”-Thick)
$4,464.00
Construct Concrete Curb Ramp with Detectable Warning
Surface
$41,800.00
Provide and Place 6" Thick Crushed Miscellaneous Base
(CMB)
$1,650.00
Furnish and Install Traffic Signal System for the intersection of Imperial HWY and Ruth Avenue/Stockwell Drive Intersection $408,429.00
Furnish and Install Traffic Signal Loop Detectors
$12,600.00
Furnish and Install a Battery Back Up System (BBS) and
Attach to New Cabinet Complete
$13,919.00
Traffic Signing, Striping, Markings and Curb Painting
$30,608.00
Furnish and Install New Post for New Sign
$1,210.00
Install Public Improvement Project Signs
$3,600.00
Provide Construction Survey, Re-establish Survey Monuments and Centerline Ties
$12,500.00
Total Proposed Cost
$623,363.00

Per City’s amended Contracting and Purchasing Policy & Procedures, Staff must request at City Council City Council Regular Meeting 686
least three proposals for professional services over $50,000 and must be accepted by City Council. Staff has requested three informal proposals for CM/CI services from on-call engineering service consultants. Staff has determined that Transtech Engineers Inc. has the necessary experience to perform construction management and construction inspection services for this project. Staff recommends City Council accept Transtech Engineers Inc. proposal for Construction Management and Inspection services for the Imperial and Ruth Avenue Traffic Signal Improvement Project in the amount of $27,720 and $43,800 respectively.

The tables below are the proposed construction budget and approved budget funding information:

Current Budget
FY23 (ARPA)
$1,001,350.00
Total Funding Available
$1,001,350.00

Estimated Construction Cost
Construction Bid
$623,363.00
15% Contingency
$93,504.00
Construction Management
$
27,720
.00
Construction Inspection
$
43,800
.00
Project Management (10%)
$62,336.00
Labor Compliance & Other (5%)
$32,277.00
Total Projected Cost
$883,000.00

Currently $920,00.00 is available to fund this project which is more than estimated project cost of $883,000.00.

Fiscal Impact:

The City Council has approved FY23 Budget of $1,001,350 in the ARPA fund for the Traffic Signal Improvements at the Intersection of Imperial Highway and Ruth Ave FY 2023-2024 Project No. 4011.68.115. Currently $920,00.00 is available to fund this project which is more than estimated project cost of $883,000.00. No additional appropriation is needed.

Coordinated With:

City Manager’s Office
City Council City Council Regular Meeting 687
DBX, Inc. Bid Proposal.pdf
Agreement-
Imperial Hwy and Ruth Avenue.pdf
Resolution Imperial___Ruth_Traffic_Signal_Award.docx
Department of Finance and Administration Services
ATTACHMENTS:

Description
City Council City Council Regular Meeting 688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710

Part 1 BD - 25

1.4.1 CITY OF LYNWOOD AGREEMENT

FOR CONSTRUCTION OF PROJECT NO. 4011.68.115 ENTITLED
“TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF
IMPERIAL HIGHWAY AND RUTH AVENUE (FY2023-2024)”

This agreement (the “Agreement”) is made and entered into on this ______ day of _______________, _____ by and between the City of Lynwood, a California Municipal Corporation ("City") and __________________________________________________, a ______________________________ ("Contractor"). City and Contractor are sometimes hereinafter referred to individually as a “Party” and collectively as the “Parties.”

R E C I T A LS

City and Contractor, based upon the mutual promises contained herein, do hereby agree as follows:

I. CONTRACT DOCUMENTS

This Agreement consists of the following Contract Documents, the terms and conditions of which are expressly incorporated as component parts of this Agreement as if herein set out in full or attached hereto:

A. Notice Inviting Bids, Dated May 8, 2023
B. Instructions to Bidders.

C. Addenda.

D. Contractor’s Bid Proposal and Workers’ Compensation Certificate dated ________________, _______, and all other Bid Documents attached thereto, including but not limited to:

1. Bid Schedule(s)

2. List of Subcontractors

3. Anti-Trust Claim

4. Non-Collusion Affidavit

5. Bidder’s General Information

6. Bid Bond (Bid Security Form)

7. Bidder’s Insurance Statement
E. Payment Bond.

F. Performance Bond.

G. Certificates/Proof of Insurance and Endorsements.

H. Certified Copy of the Lynwood City Council Resolution, not required.

I. Notice of Award dated ________________.

J. Notice to Proceed dated ______________.

K The Plans (Contract Drawings).

L. Special Provisions
M. Standard Specifications for Public Works Construction, “Greenbook” latest Edition.

DBX, Inc.

General
711

Part 1 BD - 26
N. Appendices A through H of the Contract Documents.

O. Reference Specifications.

P Approved and Fully-Executed Change Orders.

Q. The Director of the Department of Industrial Relations’ Determination of Prevailing Wage Rates for Public Works for each craft or type of worker required to perform the Work under this Agreement.

II. CONTRACT PRICE

The City agrees to pay, and the Contractor agrees to accept as full payment for the Work outlined in the Contract Documents, the Contract Price of _______________ Dollars ($_______________) subject to additions and deductions, if any, made in accordance with said Contract Documents. Progress payments shall not be made more often than once each thirty (30) days, nor shall progress payments paid be in excess of ninety percent (90%) of the Contract Price at time of completion. Final payment to Contractor will be processed thirty-five (35) days after the City has recorded the Notice of Completion.

Contractor may, upon Contractor's written request, and approved by the City Council, at Contractor's expense, deposit substitute securities, as stated in Government Code Section 16430, and as authorized by Public Contract Code, Section 22300, in lieu of retention monies withheld to insure performance.

Payment of undisputed amounts due under this Agreement, including the final payment due hereunder, is contingent upon the Contractor furnishing to the City an unconditional release by the Contractor of all claims against the City arising by virtue of this Agreement related to those amounts. Disputed claims in stated amounts may be specifically excluded by Contractor from the operation of any release. No payment, final or otherwise, shall operate to release the Contractor or its sureties from obligations arising under this Agreement or the bonds and warranties furnished hereunder. No payment shall be construed as an acceptance of any of the Work or of defective or improper materials.

III. BONDS

Within ten (10) calendar days of receiving the Notice of Award and prior to Contractor’s commencement of the Work, Contractor shall furnish to City, using the forms set forth in the Bid Documents, a Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the Contract Price, and a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, said bonds to be in conformance with the Contract Documents, including but not limited to, the General Specifications and Subsection 2.2.2 of the Special Provisions.

IV. INDEMNITY

Contractor shall defend (with counsel of City’s choosing), indemnify and hold the City, its respective elected and appointed boards, officials, officers, agents, employees, representatives, and volunteers (individually and collectively referred to hereinafter as “Indemnitees”) free and harmless from any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or equity, regardless of 623,363.00
Six Hundred Twenty Three Thousand Three Hundred Sixty Three Dollars & Zero Cents 712

Part 1 BD - 27
whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, to the extent arising out of or incident to any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Work or this Agreement, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney fees and other related costs and expenses. Contractor shall defend, at Contractor’s own cost, expense and risk, with counsel of City’s choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against Indemnitees. To the extent of its liability, Contractor shall pay and satisfy any judgment, award, or decree that may be rendered against Indemnitees in any such suit, action or other legal proceeding.

Contractor shall reimburse Indemnitees for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by California Civil Code Section 2782.

This obligation to indemnify and defend Indemnitees as set forth herein shall survive the termination of this Agreement and is in addition to any rights which City may have under the law. This indemnity is effective without reference to the existence or applicability of any insurance coverages which may have been required under this Agreement or any additional insured endorsements which may extend to City.

V. INSURANCE

Without limiting Contractor’s indemnification of Indemnitees as set forth in Section IV of this Agreement, Contractor shall obtain, provide and maintain, at its own expense, the types and amounts of insurance described in Subsection 2.7.2 of the Special Provisions of the Contract Documents. Such insurance shall be in force prior to Contractor commencing any Work under this Agreement and shall remain in force for the duration of this Agreement and for any other such period as may be required herein. Contractor shall provide proof of the required insurance coverage and the endorsements specified in Subsection 2.7.2 of the Special Provisions within ten (10) calendar days of receipt of the Notice of Award.

VI. INELIGIBLE SUBCONTRACTORS

In accordance with the provisions of Section 6109 of the California Public Contract Code, Contractor agrees that it shall not perform any work under this Agreement with a subcontractor who is ineligible to perform work on a public works contract pursuant to Sections 1777.1 and 1777.7 of the California Labor Code. Contractor further acknowledges that any contract on a public works project entered into between a contractor and debarred subcontractor is void as a matter of law, and a debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid or may have been paid to a debarred subcontractor by a Contractor for work performed on this Project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who have been allowed to work on the Project. 713

Part 1 BD - 28

VII. COMMENCEMENT OF WORK AND LIQUIDATED DAMAGES

The Contractor shall commence the Work required by this Agreement within ten (10) calendar days of the date specified in the Notice to Proceed from the City and shall complete all work as specified in the Contract Documents within ONE HUNDRED AND SIXTY(160) CALENDAR DAYS from the date in said Notice.

City and Contractor have discussed the provisions of Government Code Section 53069.85 and the damages that may be incurred by City if the Work is not completed within the time specified in this Agreement. The City and Contractor hereby represent that at the time of signing this Agreement, it is impracticable and extremely difficult to fix the actual damage which will be incurred by City if the Work is not completed within the number of working days allowed. Accordingly, City and Contractor agree that the sum of $500.00 per calendar day is a reasonable sum to assess as Liquidated Damages to City by reason of the failure of Contractor to complete the Work within the time specified.

VIII. CERTIFICATION UNDER LABOR CODE SECTION 1861

By signing this Agreement, Contractor makes the following certification required by Section 1861 of the California Labor Code:

“I am aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of any Work under this Agreement.”

IX. APPRENTICES

The Contractor acknowledges that, in accordance with Section 1777.5 of the State Labor Code, he/she will be held responsible for compliance with the provisions of this Section for all apprenticeable occupations.

X. SUBSTITUTION OF SUBCONTRACTORS

The Contractor hereby agrees to reimburse the City for costs incurred by the City in the substitution of subcontractors. Where a hearing is held pursuant to the provisions of Section 4100 et seq. of the Public Contract Code by the City or a duly appointed hearing officer, the Clerk of the City of Lynwood shall prepare and certify a statement of all costs incurred by the City for investigation and conduct of the hearing, including the costs of any hearing officer and shorthand reporter appointed.

The statement shall then be sent to the Contractor, who shall reimburse the City for such costs. If not paid separately, such reimbursement may be deducted from any money due and owing to the Contractor prior to the City’s acceptance of the Project.

714

Part 1 BD - 29
XI. LICENSES

Contractor acknowledges and agrees that Contractor must have all appropriate contractor's licenses. Contractor further warrants and represents that he/she/they has/have the appropriate contractor's license to pursue the work hereunder. Contractor's failure to have or maintain all appropriate licenses during the entire term of this Agreement shall be cause for the immediate and summary termination of this Agreement by City.

Contractor shall be liable for all City's costs incurred to complete the Work under this Agreement in the event of such termination.

XII. EMPLOYMENT DISCRIMINATION PROHIBITED

Pursuant to California Labor Code Section 1735 and other applicable provisions of law, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, political affiliation or sexual orientation in the performance of Work under this Agreement. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, political affiliation, or sexual orientation.

XIII. PREVAILING WAGES

The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects.

Since the work covered by this Agreement involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws as set forth in the foregoing statutes and in the Special Provisions of the Contract Documents.

XIV. AUTHORITY TO EXECUTE

The person or persons executing this Agreement on behalf of Contractor warrants and represents he/she/they has/have the authority to execute this Agreement on behalf of his/her/their corporation, partnership, or business entity and warrants and represents that he/she/they has/have the authority to bind Contractor to the performance of its obligations hereunder.

XV. ASSIGNMENT; GOVERNING LAW

715

Part 1 BD - 30
This Agreement may not be assigned by Contractor, in whole or in part, without the prior written consent of the City. This Agreement and any dispute arising hereunder shall be governed by the law of the state of California.

XVI. NOTICES

Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on (a) the day of delivery if delivered by hand during Contractor’s regular business hours or by facsimile before or during Contractor’s regular business hours; or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses set forth below, or to such other addresses as the Parties may, from time to time, designate in writing pursuant to the provisions of this Section.

City Contractor
City of Lynwood _______________________________
Attn: City Engineer Attn: ___________________________ 11750 Alameda Street _______________________________
Lynwood, CA 90262 _______________________________
Fax No. (310) 635-0493 Fax No.________________________

XVII. ATTORNEYS FEES

Should either Party bring any action to protect or enforce its rights under this Agreement or the Contract Documents, the prevailing party in such action shall be entitled to recover, in addition to all other relief, its reasonable attorney’s fees and costs.

XVIII. WARRANTY

All Work shall be warranted by Contractor against defective workmanship and materials for a period of one (1) year from the date the Work is accepted as complete by the Lynwood City Council. The contractor shall replace or repair any such defective work in a manner satisfactory to Engineer, following notice from Engineer specifying the work to be done and the time in which replacement or repair shall be completed. If Contractor fails to make such replacement or repair within the time specified in the notice, the City may perform the needed repairs and Contractor’s sureties shall be liable for the cost thereof.

XIX. ENTIRE AGREEMENT, WAIVER, AND MODIFICATION

This Agreement contains the completely final, entire, and exclusive agreement between the Parties with respect to the subject matter hereof, and no waiver, alteration, or modification of any of the provisions hereof or rights to act hereunder shall be binding 716

Part 1 BD - 31
unless made in writing signed by both Parties. Any attempted modification, amendment, or alteration in violation hereof shall be void.

IN WITNESS WHEREOF, each of the Parties hereto has caused the Agreement to be executed in its name on its behalf by a duly authorized officer as of this day and year first above written.

CITY OF LYNWOOD CONTRACTOR

____________________________

LEGAL NAME OF FIRM

By: _____________________________ By: __________________________ Oscar Flores Signature of Chairman of Board, Mayor President, or Vice President

Attest:
_____________________________
(Typed/Printed Name)

By: ____________________________ _____________________________ Maria Quiñónez (Title)
City Clerk

By: ___________________________
Signature of Secretary, Assistant
Approved as to Form: Secretary, CFO, or Assistant Treasurer

By: ____________________________ ______________________________ Noel Tapia (Typed/Printed Name)
City Attorney
______________________________
(Title)

[NOTARY REQUIRED FOR SIGNATURE(S) OF CONTRACTOR]

717

Part 1 BD - 32

1.4.2 CONTRACT PERFORMANCE BOND
(CALIFORNIA PUBLIC WORKS)

KNOW ALL MEN BY THESE PRESENTS:

THAT WHEREAS, the City of Lynwood (referred to hereinafter as "City") has entered into an Agreement dated________________ (referred to hereinafter as the “Agreement”) with ________________________________ (hereinafter designated as “Contractor” or "Principal"), for construction of, TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY AND RUTH AVENUE (FY 2023-2024), PROJECT No. 4011.68.115 (hereafter referred to as the “Project”).

WHEREAS, the Work to be performed by the Contractor is more particularly set forth in the Agreement for the Project, the terms and conditions of which, including those set forth in the Contract Documents incorporated as component parts the of Agreement, are expressly incorporated herein by this reference; and

WHEREAS, the Contractor is required by the Agreement to perform the terms thereof and to provide a bond both for the performance and guaranty thereof.

NOW, THEREFORE, we, , the undersigned Contractor, as Principal, and , a corporation organized and existing under the laws of the State of , and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto City in the penal sum of ____________________________________ Dollars ($_______________) lawful money of the United States, said sum being not less than 100 percent of the total amount payable by the City under the terms of the Agreement, for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the bounden Principal, his/her or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the undertakings, terms, covenants, conditions, and agreements set forth in the Agreement and any alteration thereof made as therein provided, on his/her or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill the one-year guarantee of all materials and workmanship; and indemnify and save harmless the City, its officers, officials, employees, authorized agents and volunteers, as stipulated in the Agreement, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect. In the event suit is brought on this bond, said Surety will pay to City a reasonable attorney's fee to be fixed by the Court. 718

Part 1 BD - 33
As a condition precedent to the satisfactory completion of the Agreement, unless otherwise provided for in the Agreement, the above obligation shall hold good for a period of one (1) year after the acceptance of the Work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law, or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Agreement, the Surety shall remedy the default pursuant to the Agreement, or shall promptly, at the City’s option:

(1) Take over and complete the Project in accordance with all terms and conditions in the Agreement; or

(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as Work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Agreement and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

(3) Permit the City to complete the Project in any manner consistent with California law and make available as Work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Agreement and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents. Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Agreement, or to the Project or to the Work to be performed thereunder, or the Specifications accompanying the same, shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the Project, or to the Work or to the Specifications. Said Surety also hereby waives the provisions of sections 2819 and 2845 of the California Civil Code. 719

Part 1 BD - 34
No final settlement between the City and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

IN WITNESS WHEREOF, the above-bounden parties have executed this instrument this _____ day of _______________, ________, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

PRINCIPAL:
(seal)
_______________________________

By ____________________________

SURETY:
(seal)
_______________________________

By ____________________________
Attorney-in-Fact

The rate of premium on this bond is ____ per thousand. The total amount of premium charged, $_______________. (These blanks must be filled in by corporate surety.)

IMPORTANT: Surety companies executing Bonds must possess a certificate of authority from the California Insurance Commissioner authorizing them to write surety insurance defined in Section 105 of the California Insurance Code, and if the Work or Project is financed, in whole or in part, with federal grant or loan funds, must also appear on the Treasury Department's most current list (Circular 570 as amended). Notary acknowledgements for Principal and Surety signatures and Power of Attorney for Surety must be attached. THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:

(Name and Address of Surety) (Name and Address of Agent/Representative in California if different)
__________________________________ ___________________________________________________ _________________________________ ___________________________________________________ (Telephone Number of Surety/Agent ___________________________________________________ Or Representative in California
720

Part 1 BD - 35

STATE OF CALIFORNIA )
) ss.

COUNTY OF _______________ )

On this _____ day of _______________, in the year _____, before me, __________________________, a Notary Public in and for said state, personally appeared , known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument as the Attorney-in-Fact of the (Surety) and acknowledged to me that he/she subscribed the name of the
(Surety) thereto and his/her own name as Attorney-in-Fact.

_____________________________________
Signature of Notary Public in and for said State

(SEAL)

My commission expires on: _____________

NOTE: A copy of the power of attorney to local representatives of the bonding company must be attached hereto.

CERTIFICATE AS TO CORPORATE PRINCIPAL

I, _______________________________________, certify that I am the ________________________________ Secretary of the corporation named as Principal to the within bond; that _________________ _________________________ who signed the said bond on behalf of the principal was then ___________________________ of said corporation; that I know his/her signature, and his/her signature thereto is genuine; and that said bond was duly signed, sealed and attested for and in behalf of said Corporation by authority of its governing board.

_______________________________
Signature of Corporate Principal

721

Part 1 BD - 36

1.4.3 CONTRACT PAYMENT BOND
(CALIFORNIA PUBLIC WORKS)

KNOW ALL MEN BY THESE PRESENTS:

THAT WHEREAS, the City of Lynwood, (referred to hereinafter as "City") has entered into an agreement dated __________ (referred to hereinafter as the “Agreement”) with _____ ________ , (hereinafter designated as the "Contractor" or “Principal”), for TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY AND RUTH AVENUE, 2023-2024, PROJECT No. 4011.68.115.

WHEREAS, Contractor is required to furnish a bond in connection with the Agreement, and pursuant to Section 3247 of the California Civil Code.

NOW, THEREFORE, we, , the undersigned Contractor, as Principal, and , a corporation organized and existing under the laws of the State of , and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto City and to any and all persons, companies or corporations entitled to file stop notices under Section 3181 of the California Civil Code, in the penal sum of Dollars ($____________), lawful money of the United States, said sum being not less than 100 percent of the total amount payable by City under the terms of the Agreement, for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if said Contractor, his/her or its heirs, executors, administrators, successors or assigns, or subcontractors, shall fail to pay for any materials, provisions, provender or other supplies, items, implements or machinery used in, upon, for or about the performance of the Work required by the Agreement; or fails to pay (1) any of the persons named in Civil Code Section 3181, (2) amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Agreement, or (3) for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work and labor provided pursuant to the Agreement, said Surety will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In the event suit is brought upon this bond, said Surety will pay to City a reasonable attorney's fee to be fixed by the Court. In addition to the provisions hereinabove, it is agreed that this bond will inure to the benefit of any and all persons, companies, and corporations entitled to serve stop notices under Section 3181 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same; shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. Said Surety also hereby waives the provisions of sections 2819 and 2845 of the California Civil Code.
722

Part 1 BD - 37
No final settlement between the City and the Contractor hereunder shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

IN WITNESS WHEREOF, the above-bounded parties have executed this instrument this _____ day of ____________, _____, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

PRINCIPAL:
(seal)
_______________________________

By _____________________________

SURETY:
(seal)
_______________________________

By _____________________________
Attorney-in-Fact

IMPORTANT: Surety companies executing Bonds must possess a certificate of authority from the California Insurance Commissioner authorizing them to write surety insurance defined in Section 105 of the California Insurance Code, and if the Work or Project is financed, in whole or in part, with federal grant or loan funds, must also appear on the Treasury Department's most current list (Circular 570 as amended). Notary acknowledgements for Principal and Surety signatures and Power of Attorney for Surety must be attached. THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:

(Name and Address of Surety) (Name and Address of Agent/Representative in California if different) ________________________________ ___________________________________________________________ ___________________________________ ___________________________________________________________________ __________________________________ _________________________________________________________________ (Telephone Number of Surety/Agent _________________________________________________________________ or Representative in California)

723

Part 1 BD - 38

STATE OF CALIFORNIA )
) ss.

COUNTY OF _______________ )

On this _____ day of _______________, in the year _____, before me, __________________________, a Notary Public in and for said state, personally appeared , known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument as the Attorney-in-Fact of the (Surety) and acknowledged to me that he/she subscribed the name of the (Surety) thereto and his/her own name as Attorney-in-Fact.

_____________________________________
Signature of Notary Public in and for said State

(SEAL)

My commission expires on: _____________

NOTE: A copy of the power of attorney to local representatives of the bonding company must be attached hereto.

CERTIFICATE AS TO CORPORATE PRINCIPAL

I, _______________________________________, certify that I am the ________________________________ Secretary of the corporation named as Principal to the within bond; that _________________ _________________________ who signed the said bond on behalf of the principal was then ___________________________ of said corporation; that I know his/her signature, and his/her signature thereto is genuine; and that said bond was duly signed, sealed and attested for and in behalf of said Corporation by authority of its governing board.

_______________________________
Signature of Corporate Principal

(CORPORATE SEAL)

724

Part 1 BD - 39

1.4.4 CERTIFICATES / PROOF OF INSURANCE

AND ENDORSEMENTS

The Contractor shall not commence any of the Work or begin any performance under the Agreement until he/she obtains, at his/her own and sole cost and expense, all required insurance as stipulated by the City. The required insurance shall be provided by the Contractor in conformance with the requirements of Subsection 2.7.2 of the Special Provisions and may include the following:

 Workers' Compensation Insurance
 Commercial General Liability and Business Automobile Liability Insurance  Course of Construction or Builder’s Risk Insurance
 Flood Insurance

The insurance company or companies utilized by the Contractor shall be authorized and admitted to transact business in the State of California and to issue policies in the amounts required pursuant to the provisions of Subsection 2.7.2 of the Special Provisions. All insurance required shall be placed with insurers with a current A.M. Best's rating of no less than A:VII, and shall contain the endorsements specified in Subsection 2.7.2.

Within ten (10) calendar days after receipt of the Notice of Award, Contractor shall furnish to the City for approval as to sufficiency and form, certificates of insurance and original endorsements evidencing the required coverage set forth in Subsection 2.7.2 of the Special Provisions. Endorsements and certificates are to be signed by a person authorized by the insurer to bind coverage on the insurer’s behalf. If the insurance called for is provided by more than one company, a separate certificate and the required endorsements shall be provided by each company.

City reserves the right to request complete, certified copies of all required insurance policies and endorsements at any time.

Failure to provide City with the required insurance coverage, proof of insurance and/or endorsements within ten (10) calendar days of receipt of the Notice of Award, may result in withdrawal of award and forfeiture of the Bidder's Bid Security.

725

Part 1 BD - 40

ADDENDUM

By executing this Addendum, Contractor acknowledges and agrees that the work performed pursuant to the above referenced Agreement is subjected to all applicable provisions.

Payment of Minimum Compensation to Employees. Contractor shall be obligated to pay not less than the General Prevailing Wages Rate as required by applicable law.

A. Prevailing Wage Requirements. California Labor Code requires the payment of not less than the general prevailing rate of per diem wages and rates for holiday and overtime and adherence to all labor standards and regulations. The General Prevailing Wages Rates may be adjusted throughout the term of this Agreement.

Notwithstanding any other provision of this Agreement, Contractor shall not be entitled to any adjustment in compensation rates in the event there are adjustments to the General Prevailing Wages Rates.

B. Reports. Contractor shall not perform on site work on this contract until labor compliance documents are filed. Contractor agrees to cooperate with the City to fulfill its notifications requirement to the DIR, as required by DIR’s PWC-100 form or any other required form, and Contractor agrees to provide to the City the information required by the DIR, as generally set forth in Labor Code Section 1773.3. By signing this form, Contractor, and all of its subcontractors, represents that it has registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions under Labor Code section 1771.1(a)] and paid the annual fee due to the DIR, unless the Contractor meets an exception recognized by the DIR or by the law.

C. Furnishing of Electronic Certified Payroll Records to Labor Commissioner.

Contractor and subcontractor agree to furnish the required electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement), in the manner and under the time frame required by law.

D. Audit Rights. All records or documents required to be kept pursuant to this Agreement to verify compliance with the Wage Requirement shall be made available for audit at no cost to City, at any time during regular business hours, upon written request by the City Attorney, City Auditor, City Manager, or a designated representative of any of these officers. Copies of such records or documents shall be provided to City for audit at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records or documents shall be available at CONTRACTOR’s address indicated for receipt of notices in this Contract.

E. Enforcement.

1. General. CONTRACTOR acknowledges it has read and understands that, pursuant to the terms and conditions of this Agreement, it is required to comply 726

Part 1 BD - 41
with the Wage Requirement and to submit certain documentation to the City establishing its compliance with such requirement. (“Documentation Provision.”) CONTRACTOR further acknowledges the City has determined that the Wage Requirement promotes each of the following (collectively “Goals”):
a. It protects public job opportunities and stimulates the City’s economy by reducing the incentive to recruit and pay a substandard wage to labor from distant, cheap-labor areas.
b. It benefits the public through the superior efficiency of well-paid employees.
c. It increases competition by promoting a more level playing field among contractors with regard to the wages paid to workers.

2. CONTRACTOR’s Breach of Prevailing Wage/Living Wage Provisions.

WITHHOLDING OF PAYMENT: CONTRACTOR agrees that the
Documentation Provision is critical to the City’s ability to monitor CONTRACTOR’s compliance with the City’s public wage obligations.

CONTRACTOR’s further agrees its breach of the Documentation Provision or general public wage obligations results in the need for additional enforcement action to verify compliance with this Addendum. In light of the critical importance of the Documentation Provision, the City and CONTRACTOR agree that CONTRACTOR’s compliance with this Addendum is an express condition of City’s obligation to make each payment due to the CONTRACTOR pursuant to this Agreement. THE CITY IS NOT OBLIGATED TO MAKE ANY PAYMENT

DUE THE CONTRACTOR UNTIL CONTRACTOR HAS PERFORMED ALL OF ITS OBLIGATIONS UNDER THESE PROVISIONS. THIS PROVISION MEANS

THAT CITY CAN WITHOLD ALL OR PART OF A PAYMENT TO
CONTRACTOR UNTIL ALL REQUIRED DOCUMENTATION IS SUBMITTED.

Any payment by the City despite CONTRACTOR’s failure to fully perform its obligations under these provisions shall not be deemed to be a waiver of any other term or condition contained in this Agreement or a waiver of the right to withhold payment for any subsequent breach of this Documentation Provision or public wage obligations of the Contractor and the City.

727

Part 1 BD - 42

CITY OF LYNWOOD

DEPARTMENT OF PUBLIC WORKS

PART 2 - SPECIAL PROVISIONS

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF
IMPERIAL HIGHWAY AND RUTH AVENUE, FY 2023-2024
PROJECT No. 4011.68.115

Section 2.1 General, Terms, Definitions, Abbreviations, and Symbols

2.2 Scope of the Work

2.3 Control of the Work

2.4 Control of Materials

2.5 Legal Relations and Responsibilities

2.6 Prosecution and Progress of the Work

2.7 Measurement and Payment

2.8 Facilities for Agency Personnel

2.9 City Standards, Standard Plans and Drawings
- Existing Improvements (Section 400 – Protect and Restoration) - Temporary Traffic Control (Section 600—Access)

* * * * *
728

Part 2 BD - 1

CITY OF LYNWOOD

PUBLIC WORKS DEPARTMENT

PART 2 - SPECIAL PROVISIONS

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF

IMPERIAL HIGHWAY AND RUTH AVENUE
FY 2023-2024,
PROJECT No. 4011.68.115

SECTION 2.1 - TERMS, DEFINITIONS, ABBREVIATIONS, AND SYMBOLS

2.1.1 GENERAL
The following additions/modifications are hereby made to the Standard Specifications:

2.1.1.1 Standard Specifications. - The Work hereunder shall be done in accordance with the Standard Specifications of the City of Lynwood, Standard Specifications for Public Works Construction ("Greenbook"), latest Edition, including all current supplements, addenda, and revisions thereof, the City Standard Plans identified in the Appendix, and the Special Provisions set forth in this Part 2 of the Contract Documents.

In case of conflict between the technical provisions of the Caltrans Standard Specifications, latest Edition and these Special Provisions, these Special Provisions shall take precedence over, and be used in lieu of, such conflicting portions.

2.1.1.2 Supplementary Reference Specifications. - Insofar as references may be made in these Special Provisions to the Caltrans Standard Specifications, such work shall conform to the referenced portions of the technical provisions of the Caltrans Standard Specifications, latest Edition, provided, that wherever the term "Standard Specifications" is used without the prefix "Caltrans," it shall mean the Standard Specifications for Public Works Construction ("Greenbook"), latest Edition, as previously specified in the above Subsection 2.1.1.1.

In case of conflict between the technical provisions of the Caltrans Standard Specifications, latest Edition and these Special Provisions, these Special Provisions shall take precedence over, and be used in lieu of, such conflicting portions.

2.1.2 LEGAL ADDRESS

2.1.2.1 Legal Address of the Agency. - The official address of the Agency shall be the City of Lynwood, 11330 Bullis Road, Lynwood, California 90262, or such other address as the City may subsequently designate in written notice to the Contractor. 729

Part 2 BD - 2

2.1.2.2 Legal Address of the Engineer. - The official address of the Engineer shall be 11330 Bullis Road, Lynwood, California 90262, or such other address as the Engineer may subsequently designate in writing to the Contractor.

2.1.2.3 Legal Address of the Agency’s Project Representative. – The name and address of the Agency’s designated Project Representative shall be Mir T. Fattahi, MsCE, P.E., Acting City Engineer, 11330 Bullis Road, Lynwood, California 90262, or such address as the Project Representative may subsequently designate in writing to the Contractor.

2.1.3 DEFINITIONS AND TERMS

2.1.3.1 Definitions and Terms. - Wherever in the Standard Specifications the following terms are used, the definitions shall be amended to read:

Agency - The City of Lynwood, a California municipal corporation and general law city, existing in the County of Los Angeles, State of California.

Board – The City Council of the City of Lynwood.

Engineer - The City Engineer of the City of Lynwood or other persons designated by the City Engineer.

Liquidated Damages - The amount prescribed in these Special Provisions, pursuant to the authority of Government Code Section 53069.85, to be paid to the City or to be deducted from any payments due or to become due to the Contractor for each day's delay in completing the whole or any specified portion of the Work beyond the time allowed in the Special Provisions.

Standard Plans - The Standard Drawings and the Special Drawings of the City of Lynwood.

2.1.3.2 Additional Definitions and Terms. - The following additional terms and definitions used in the Contract Documents shall apply:

Project – The Work that is the subject of the Contract Documents.

Total Bid Price – The full price for all the Work required to complete the Project submitted by a Bidder in the Bid Documents.

Unit Price – The amount set forth in a Bid Schedule document for a single unit of an item of work.

Unit Price Bid Item – An item of work to which a Unit Price applies.

- END OF SECTION -
730

Part 2 BD - 3
SECTION 2.2 - SCOPE AND CONTROL OF WORK

2.2 SCOPE OF THE WORK

The work to be done, in general, consists of, but is not limited to the following: Mobilization, traffic control, remove existing crosswalks, warning lights, and streetlights; removal and construction of concrete sidewalks, curb and gutters, curb ramps; furnish and install traffic signal system, battery backup system, Pull boxes, traffic signal loop detectors and connect DLC to pull box, relocate fire hydrant and water valve, providing construction survey, and traffic signing, striping and markings as shown on the plans and noted in these special provisions.
2-2.1 PERMITS.

The text of Subsection 2-2 of the Standard Specifications is hereby deleted and replaced with the following:

Prior to the start of any work, the Contractor shall take out the applicable AGENCY permits and make arrangements for AGENCY inspections. The AGENCY will issue the permits at no charge to the Contractor. The Contractor and all subcontractors shall each obtain an AGENCY business license and shall be licensed in accordance with the State Business and Professions Code. The Contractor shall also obtain any and all other permits, licenses, inspections, certificates, or authorizations required by any governing body or entity.

2.2.2 CONTRACTOR’S SURETY WAIVER OF RIGHT OF NOTIFICATION

The following shall be added to the Standard Specifications:

"The Contractor shall ensure that its Surety is familiar with all of the terms and conditions of the Contract Documents, and shall obtain a written acknowledgment by the Surety that said Surety thereby waives the right of special notification of any changes or modifications of the Agreement, or of extensions of time, or of decreased or increased Work, or of cancellation of the Agreement, or of any other act or acts by the City of Lynwood or any of its authorized representatives."

2.2.3 CHANGES INITIATED BY THE AGENCY

The following sentence shall be added to the Standard Specifications:

All Change Orders shall be subject to the provisions of Subsection 6-3.15 of the Lynwood Municipal Code.

731

Part 2 BD - 4

2.2.4 EXTRA WORK

The provisions of Section 2-8 of the Standard Specifications shall apply; provided that the provisions governing markup percentages for overhead and profit for extra work referenced in Subsection 2-8 and 7-4.3 Markup, Paragraph (a) Work by Contractor of the latest Edition shall be deleted in their entirety and the following substituted therefor:

(a) Work by Contractor. The following percentages shall be added by the City to the Contractor's costs and shall constitute the markup for all overhead and profit.

1) Labor 20 percent
2) Materials 15 percent
3) Equipment rental 15 percent
4) Other items & expenditures 15 percent
5) Subcontracts (1st tier only) 5 percent
6) Lower Tier subcontractors none

To the sum of costs and markups provided for in this subsection, one percent shall be added by the City as compensation for bonding.

2.2.5 TEMPORARY ACCESS OR CONSTRUCTION RIGHTS-OF-WAY

Subsection 2-3 of the Standard Specifications shall be deleted in its entirety and the following substituted therefor:

All temporary access or construction rights-of-way, other than those shown on the Plans, which the Contractor may find it requires during progress of the Work, shall be arranged by and paid for entirely by the Contractor, at its own expense.

2.2.6 TESTING

The Contractor shall provide, at its sole cost and expense, any testing indicated by the Contract Documents. The testing shall be performed by a company approved by the Engineer. Only initial compaction tests which produce results meeting the City’s previously specified requirements shall be at the City’s expense. All compaction testing which produces results that fail to meet the City’s previously specified requirements and all retaking of such tests shall be at the Contractor’s expense and City shall not pay Contractor any compensation therefor.

The Contractor, at its sole expense, shall excavate any holes necessary for compaction tests, backfill the holes, compact the backfill placed in the holes, and pave the surface, if required, after the test(s) are completed.

2.2.7 SITE EXAMINATION

The Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work. The submittal of a Bid Proposal shall be conclusive evidence that the 732

Part 2 BD - 5
Contractor has investigated and examined the Work site and is satisfied as to the conditions to be encountered, including but not limited to, locality, uncertainty of weather and all other contingencies, and the character, quality, quantities, and scope of the Work, materials to be furnished, and all Agreement requirements which could in any way affect the Work or the costs thereof. The failure of the Contractor to acquaint itself with all available information regarding any applicable existing or future conditions shall not relieve it from the responsibility for properly estimating the difficulties, responsibilities, or costs of successfully performing the Work according to the Contract Documents.

2.2.8 FLOW AND ACCEPTANCE OF WATER

Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, and has prepared its Bid; accordingly, and the Contractor, by submitting such a Bid, assumes all said risk.

2.2.9 RECYCLING AND DIVERSION OF DEBRIS

The Contractor shall adhere to all provisions of Section 9-6, “Recycling and Diversion of Debris from Construction and Demolition,” of the City of Lynwood Municipal Code.

2.2.10 POLLUTION CONTROL

2.2.10.1 Water Pollution Control

The Contractor shall adhere to all provisions of Section 14-12 of the Lynwood Municipal Code: “Stormwater and Urban Runoff Pollution Control,” and the Federal Clean Water Act, including but not limited to, the National Pollutant Discharge Elimination System (NPDES) standards. The Contractor shall implement all provisions of the Storm Water Pollution Prevention Plan (SWPPP) prepared by the City. Delete the SWPPP provision if project site is less than one (1) acre.

2.2.10.2 Sound Pollution Control

The Contractor shall ensure that its operations do not exceed a noise level of 86- decibels (db) as measured at a distance of 50 feet from all its sources of operation.

2.2.10.3 Air Pollution Control

The Contractor shall adhere to all applicable rules and regulations of the California Air Resource Board (CARB) and the South Coast Air Quality Management District (SCAQMD).

- END OF SECTION -
733

Part 2 BD - 6
SECTION 2.3 – Control of The Work

2.3.1 SELF-PERFORMANCE.

The whole paragraph of Section 3-2 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall perform or provide, with its own organization, contract labor, materials, and equipment amounting to at least 50 percent of the Contract Price. The contract labor performed or provided by the Contractor shall amount to at least 25 percent of the total contract labor for the Contract. Contract labor shall exclude the Contractor’s superintendent. Any designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed may be deducted from the Contract Price before computing the amount of contract labor, materials, and equipment required to be performed or provided by the Contractor with its own organization. Where an entire item is subcontracted, the value of contract labor, materials, and equipment subcontracted will be based on the estimated percentage of the Contract Unit or Lump Sum Price, determined from information submitted by the Contractor, subject to approval by the Engineer.

The Contractor with the bid package shall submit a list of all subcontractors intended to perform work on the project. This list shall include the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime contractor’s total bid. The prime contractor shall provide a description by bid item number or otherwise fully designate the portion of work to be performed by each subcontractor.

2.3.2 PRECEDENCE OF CONTRACT DOCUMENTS

The provisions of Subsection 3-7.2 of the Standard Specifications shall be deleted in their entirety and the following substituted therefor:

The Contract Documents are complementary, and what is called for by one shall be as binding as if called for by all.

The Contract Documents are intended to be fully cooperative and to be complementary. If Contractor observes that any documents are in conflict, the Contractor shall promptly notify the Engineer in writing.

In resolving disputes resulting from conflicts, errors, or discrepancies in any of the Contract Documents, the document highest in precedence shall control. The order of precedence shall be as listed below:

734

Part 2 BD - 7

1. Approved and Fully-Executed Change Orders

2. Agreement

3. Addenda

4. Contractor's Bid (Bid Documents)

5. Technical Provisions

6. Special Provisions

7. General Provisions of the Standard Specifications

8. Notice Inviting Bids

9. Instructions to Bidders

10. Plans (Contract Drawings)

11. Standard Specifications

12. City Standard Plans

13. Reference Specifications

With reference to the Drawings, the order of precedence shall be as follows:

1. Figures govern over scaled dimensions.

2. Detail drawings govern over general drawings.

3. Addenda or Change Order drawings govern over Contract Drawings.

4. Contract Drawings govern over Standard Drawings.

5. Contract Drawings govern over Shop Drawings.

2.3.3 SUBMITTALS

The following provision shall be added at the end of Subsection 3-8.1 of the Standard Specifications:

On lump sum contracts, the Contractor shall submit, for approval by the Engineer, a Schedule of Values, or lump sum price breakdown, which will serve as the basis for progress payments and shall be incorporated into a form of payment request (or invoice) acceptable to the Engineer. Such a Schedule of Values shall be submitted for approval at the Pre- construction Conference and must meet the approval of the Engineer before any payments can be made to the Contractor.

2.3.4 SUBSURFACE DATA

The provisions of Subsection 3-9 of the Standard Specifications shall be deleted in their entirety and following substituted therefor:

Limited Reliance by Contractor. - Soils reports and other reports of subsurface conditions may be made available by the City for inspection by the Contractor. HOWEVER, SUCH REPORTS AND DRAWINGS ARE NOT CONTRACT DOCUMENTS. The Contractor may rely upon the general accuracy of the "technical data" contained in such reports and drawings only where such "technical data" are specifically identified in the Special Provisions. Except for such reliance on such "technical data," the Contractor may not rely upon or make any claim against the City, the Engineer, nor any of the Engineer's Consultants with respect to any of the following:
735

Part 2 BD - 8

Completeness. - The completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto, or

Other Information. - Any other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings, or

Interpretation. - Any interpretation by the Contractor of such "technical data," or any conclusion drawn from any "technical data" or any such data, interpretations, opinions or information.

2.3.5 PERMANENT SURVEY MARKERS

The provisions of Subsection 3-10.1 of the Standard Specifications shall be deleted in their entirety and the following substituted therefor:

It shall be the Contractor's responsibility to protect all the existing survey monuments, bench marks, survey marks and stakes. Removal of such monuments, or displacement thereof, shall require their resetting, including corner record filing, for the existing type of monument in question at the Contractor's sole expense.

Any existing monument shall not be disturbed. Where the Engineer concurs, in writing, with the Contractor that protecting an existing monument in place is impractical, the Contractor shall employ a California Licensed Land Surveyor to establish the location of the monument before it is disturbed. The Contractor shall have the monument replaced by a California Licensed Land Surveyor no later than thirty (30) days after construction is completed at the site of the replacement. The California Licensed Land Surveyor shall file corner record(s) as required by Sections 8772 and 8773, et seq., of the California Business and Professions Code.

Payment for the costs of Land Surveyors, replacement of disturbed monuments and the filing of corner records shall not be considered part of the work necessitating the disturbance of said monuments and no additional payment will be made by City to Contractor therefor.

2.3.6 SURVEY SERVICE

The provisions of Subsection 3-10 of the Standard Specifications shall be deleted in their entirety and the following substituted therefor:

The Contractor shall hire and pay for the services of a California Licensed Land Surveyor to perform all work necessary for establishing control, construction staking, records research, and all other surveying work necessary to perform the Work; and to provide other surveying services, if required by the Contract Documents, in accordance with the Land Surveyors Act. The California Licensed Land Surveyor shall be present on the site during all surveying operations and shall personally supervise and certify the surveying work. 736

Part 2 BD - 9

Payment for work performed to satisfy the requirements of surveying shall be included by Contractor in its bid for any items requiring the survey work and no additional payment will be made by City to Contractor therefor.

2.3.7 INSPECTION

The provisions of Subsection 3-5 of the Standard Specifications shall be deleted in their entirety and the following substituted therefor:

The Engineer shall have complete and safe access to the Work at all times during construction, and shall be furnished with every reasonable facility for ascertaining that the materials and the workmanship are in accordance with the Contract Documents, including but not limited to, the Standard Specifications, the Special Provisions, and the Plans. All labor, materials, and equipment furnished shall be subject to the Engineer's inspection. The Contractor shall notify the engineer at least twenty-four (24) hours before any inspection is required.

If the Contractor is allowed by the Engineer to work outside the hours of operations specified in this Special Provisions, on weekends, or on days designated as holidays by the City, and if the Engineer decides that inspection services are required during such times, the costs for those services shall be borne by the Contractor. When the Work is substantially completed, a representative of the Engineer will make the final inspection.

- END OF SECTION -
737

Part 2 BD - 10
SECTION 2.4 - CONTROL OF MATERIALS

2.4.1 MATERIALS

2.4.1.1 GENERAL.

The following is hereby added to this subsection of the Standard Specification:

The Contractor and all subcontractors, suppliers, and vendors shall guarantee that the entire work will meet all requirements of this contract as to the quality of materials, equipment, and workmanship. The Contractor, at no cost to the AGENCY, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one (1) year after the date of recordation of the Notice of Completion. Within this one-year period, the Contractor shall also restore to full compliance with requirements of this contract any portion of the work which is found to not meet those requirements. The Contractor shall hold the AGENCY harmless from claims of any kind arising from damages due to said defects or noncompliance. The Contractor shall make all repairs, replacements, and restorations within thirty (30) days after the date of the City Engineer’s written notice.

The Contractor shall place the order(s) for all long-lead supplies, materials, and equipment, for any traffic signing, striping, legends, and traffic control facilities within three (3) working days after the receipt of the Notice of Award from the City. The Contractor shall furnish the Engineer with a statement from the vendor(s) that the order(s) for said supplies, materials, and equipment has been received and accepted by said vendor(s) within fifteen (15) working days from the date of receipt of Notice of Award.

2.4.2 TRADE NAMES OR EQUALS

2.4.2.1 Substitutions. - Paragraph 2 of Subsection 4-6 of the Standard Specifications shall be amended to read as follows:

Whenever any particular material, process, or equipment is indicated by a patent, proprietary, or brand name, or by the name of the manufacturer, such wording is used for the purpose of facilitating its description and shall be deemed to be followed by the words "or equal." A Bidder may offer any material, process, or equipment considered as equivalent to that indicated, unless the City Council, or its designee, makes a finding that is described in the invitation for bids or request for proposal that a particular material, product, thing, or service is designated by specific brand or trade name for any of the following purposes:

1. In order that a field test or experiment may be made to determine the product's suitability for future use.
738

Part 2 BD - 11

2. In order to match other products in use on a particular public improvement either completed or in the course of completion.

3. In order to obtain a necessary item that is only available from one source.

4. In order to respond to an emergency declared by a local agency, but only if the declaration is approved by a four-fifths vote of the governing board of the local agency issuing the invitation for bid or request for proposals; or in order to respond to an emergency declared by the state, a state agency, or political subdivision of the state, but only if the facts setting forth the reasons for the finding of the emergency are contained in the public records of the authority issuing the invitation for bid or request for proposals.

Failure of the Bidder to submit requests for substitution with the Bid, using the form provided in Appendix C of the Contract Documents, shall be deemed to signify that the Bidder, if awarded the contract, intends to furnish one of the brands named in these Special Provisions and the Bidder does thereby waive all rights to offer or use substitute materials, products, or equipment for that which was originally specified. Data substantiating a request for substitution of an "or equal" item shall be submitted either with the Bid or not later than ten (10) days following the Bid opening, and will not be considered until after execution of the Agreement by all parties.

2.4.2.2 Submittals for Approval of "Or Equals." – The first sentence of Paragraph 3 of Subsection 4-6 of the Standard Specifications shall be amended to read as follows:

Should the Contractor request approval for substitution of "or equal" products, it shall, at its expense, submit data substantiating such request to the Engineer as per Subsection above. Data for approval to substitute "or equal" products shall include complete calculations, technical specifications, samples, or published documents relating to the performance and physical characteristics of the proposed substitute.

- END OF SECTION -
739

Part 2 BD - 12
SECTION 2.5 – Legal Relations and Responsibilities

2.5.1 LABOR

2.5.1.1 General.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor, and all subcontractors, suppliers, and vendors, shall comply with all AGENCY, State, and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. In accordance with the labor Code, as provided in Section 1773 et seq., the City has on file in the City Clerk’s office the latest prevailing rates as established by the Director of Industrial Relations of the State of California. The Contractor shall not pay less than these rates.

2.5.2 INSURANCE.

2.5.2.1 General Liability Insurance.

The liability insurance coverage values are hereby amended to be:

Insurance Coverage Requirements Limit Requirements

Comprehensive General Liability $2,000,000
Product/Completed Operations Hazard $2,000,000
Comprehensive Automobile Liability $2,000,000
Contractual General Liability $2,000,000
Worker’s Compensation Statute

A combined single limit policy with aggregate limits in the amount of $4,000,000 will be considered equivalent to the required minimum limits. A pro forma copy of the policy(s) shall be submitted to the City. A certificate of endorsement naming the City and its Agents as additional insured identifying the coverage limits, dates of coverage insurance provided, and project number is required.

2.5.3 SAFETY.

2.5.3.1 Work Site Safety.

2.5.3.2 General.

Subsection 2.5.3.2 is hereby added to Section 5 of the Standard Specifications as follows:

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of 740

Part 2 BD - 13
life, or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the AGENCY for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the AGENCY does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

- END OF SECTION -
741

Part 2 BD - 14
SECTION 2.6 – PROSECUTION AND PROGRESS OF THE WORK

2.6.1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s proposed Construction Schedule shall be submitted to the Engineer within ten working days after the date of the Agency’s execution of the Contract Agreement. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.

Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed Construction Schedule and delivery dates, arrange utility coordination, discuss construction methods, and clarify inspection procedures.

The Contractor shall submit periodic Progress Reports to the Engineer by the last day of each month. The Report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.

2.6.2 TIME OF COMPLETION

After the Agreement has been executed by all parties, and a written Notice to Proceed has been issued to the Contractor, the Contractor shall start the Work within ten (10) working days after the date specified in said Notice to Proceed.

Said Work shall be diligently prosecuted to completion before the expiration of:

ONE HUNDRED AND SIXTY (160) WORKING DAYS

from the date specified in a written Notice to Proceed from the City.

2.6.3 DEFAULT BY CONTRACTOR

2.6.3.1 The provisions Subsection 6-7 of the Standard Specifications shall be deleted in their entirety and the following substituted therefor:

The Agreement may be cancelled by the City Council without liability for damages, upon the City Council’s determination that the Contractor is not complying in good faith with the terms of the Agreement, has become insolvent, or has assigned or subcontracted any part of the Work without the City Council’s consent. In the event of such cancellation, the Contractor will be paid the actual amount due based on Unit Prices or lump sums bid and the quantity of Work completed at the time of cancellation. Any damages sustained by the City due to acts or omissions of the Contractor will be 742

Part 2 BD - 15
subtracted from this amount. The Contractor, in having tendered a Bid, shall be deemed to have waived any and all claims for damages because of cancellation of the Agreement for any of the reasons specified in this paragraph. If the City declares the Agreement canceled for any of the reasons specified in this paragraph, written notice to that effect shall be served by the City via personal delivery or by certified mail (return receipt requested) upon Contractor’s Surety. The Surety shall, within five (5) working days after receiving the written notice, assume control and perform the work as successor to the Contractor.

If the Contractor fails to: begin delivery of material and equipment; commence work within time specified; maintain the rate of delivery of material; execute the work in the manner and at such locations as specified; maintain a work program which will ensure the City’s interest; or carry out the intent of the Agreement; written notice may be served by the City via personal delivery or by certified mail (receipt requested) upon the Contractor and its Surety on its Performance Bond demanding satisfactory compliance with the Agreement.

If the Contractor or its Surety does not comply with such notice within five (5) working days after receiving it, or fails to continue after starting to comply, the City may exclude the Contractor and/or its Surety from the premises and take possession of all material and equipment. The City may complete the Work in any manner consistent with applicable California law, including but not limited to use of its own forces, or by letting the unfinished work to another Contractor.

In any event, the cost of completing the Work shall be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the City. If the sums due under the Agreement are insufficient, the Contractor or Surety shall pay to the City, within five (5) working days after the completion of the unfinished work, all costs in excess of the sums due.

If the Surety assumes any part of the Work, it shall take the Contractor’s place in all respects for that part and shall be paid by the City for all work performed by it in accordance with the Agreement. If the Surety assumes the entire Agreement, all money due the Contractor at the time of its default shall be payable to the Surety as the work progresses, subject to the terms of the Agreement.

The provisions of this Subsection shall be in addition to all other rights and remedies available to the City under law.

2.6.4 DAYS DESIGNATED AS HOLIDAYS BY THE CITY OF LYNWOOD

2.6.4.1 Days Designated as Holidays by the City of Lynwood. - In accordance with the Standard Specifications, the days designated as holidays by the City are:

New Year’s Day Independence Day
Martin Luther King’s Birthday Labor Day
743

Part 2 BD - 16
César Chávez’s Birthday Thanksgiving Day
Christmas Day Memorial Day

Any holiday shown above that falls on a Sunday shall be observed the following Monday.

2.6.4.2 Days Designated as Holidays by BOTH the State of California AND the United States Federal Government. - In addition to the holidays specified in §2.6.4.1, holidays observed by BOTH the State of California AND the United States federal government shall also be granted by the City and are designated as follows:

Presidents’ Day Columbus Day
Veterans’ Day
Any holiday shown above that falls on a Sunday shall be observed the following Monday.

2.6.5 LIQUIDATED DAMAGES

2.6.5.1 Amount. - The applicable amount of Liquidated Damages shall be specified in the Agreement is the sum of $500.00 per calendar day.

2.6.6 TIMES OF OPERATION

2.6.6.1 Hours of Operation. - No construction activities shall take place and no person shall operate, permit, use, or cause to operate any of the following, other than between the hours of 7:00 a.m. to 3:30 p.m. (9:00 a.m. to 3:00 p.m. for work involving arterial streets), Monday through Friday, with no work allowed on City-observed holidays, unless otherwise approved by the Engineer:

1. Powered Vehicles

2. Construction Equipment

3. Loading and Unloading Vehicles

4. Domestic Power Tools

2.6.7 NOTIFICATION

The Contractor shall notify the City of Lynwood and the owners of all utilities, subsurface installations, and substructures not less than forty-eight (48) hours prior to starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:

AT&T (310) 515-2419
City of Lynwood (310) 603-0220
City of Lynwood Water & Sewer (310) 603-0220, Ext. 800 Consolidated Disposal Services (trash collection) (562) 577-6277 Los Angeles County Fire Department (Sta. 147) (310) 605-5670 744

Part 2 BD - 17
Los Angeles County Fire Department (Sta. 148) (310) 603-5270 L.A. County Public Works/Flood Control (626) 458-5100 Los Angeles County Sheriff’s Department (323) 508-4800 MV Transportation, Inc. (bus service) (562) 259-9911
Lynwood Unified School District (310) 605-5670
Park Water Company (562) 923-0711
Southern California Edison (800) 655-4555 or (310) 608-5005 Southern California Gas (310) 605-7909
Time Warner Cable (562) 259-2015 or (888) 892-2253 Underground Service Alert (800) 227-2600
U.S. Postal Service (800) 275-8777

The Contractor shall notify the U.S. Postal Service and trash collection company of all work areas affecting service five (5) working days prior to construction and shall coordinate the work so that these services are not interrupted.

2.6.8 CONSTRUCTION SCHEDULE

The provisions of Subsection 6-1 of the Standard Specifications shall be amended as set forth in the following Subsections:

2.6.8.1 Schedule of Work. - A schedule of Work as required under Section 6-1 of the Standard Specifications shall be provided by the Contractor at the pre-construction meeting.

2.6.8.2 Method. - The Contractor shall provide a project management tool in the form of a Critical Path Method (CPM) network schedule for planning and scheduling of all work required under the Agreement. All schedule reports shall be in the form of computer printouts. The Contractor may elect to use bar charts (Gantt charts) as a supplementary on-site scheduling tool; provided, that all such bar charts shall be generated in the computer from the approved CPM network schedule.

CPM schedules may be submitted in either arrow diagram or time-scaled precedence diagram format, subject to the requirements of these Special Provisions.

2.6.8.3 Qualifications. - A statement of computerized CPM capability shall be submitted in writing prior to the award of the Contract, and shall verify that either the Contractor's organization has in-house capability to prepare and use CPM scheduling techniques, or that the Contractor will employ a CPM consulting firm who is so qualified.

2.6.8.4 Submittal Procedures. - Within twenty (20) working days of execution of the Agreement by all parties, and within ten (10) working days of the Engineer's written request at any other time, the Contractor shall submit the schedule and schedule reports in the form specified herein. The Contractor, if requested by the Engineer, shall provide revised network diagrams and schedule reports if at any time the Engineer considers the completion date to be in jeopardy because of "activities behind schedule." Such additional network diagrams and reports shall include a new arrow 745

Part 2 BD - 18
or precedence diagram and schedule reports conforming to the requirements of Subsection 2.6.8.7 of these Special Provisions, showing how the Contractor intends to accomplish the Work to meet the completion time specified. The form and method employed by the Contractor shall be the same as that required for the initial schedule submittal.

2.6.8.5 Schedule Revisions. - The Contractor shall modify any and all portions of the construction schedule that become infeasible because of activities or procurement behind schedule, or for any other valid reason. Any activity that cannot be completed by its original latest completion date shall be deemed to be behind schedule.

2.6.8.6 Change Orders. - Upon issuance of a Change Order or other Contract modification, the approved change shall be reflected in the next submittal of the Construction Schedule.

2.6.8.7 Approved Standards. -

2.6.8.7.1 Definition. - CPM scheduling, as required under this Section, shall be interpreted to be generally as outlined in the Associated General Contractors of America publication, "The Use of CPM in Construction," as amended by these Special Provisions.

2.6.8.7.2 Construction Schedules. - Construction schedules shall include computer-generated graphic networks and computerized construction schedule reports meeting requirements of this Section.

2.6.8.7.3 Networks. - The CPM scheduling network shall be in the form of a time-scaled arrow or time-scaled precedence diagram of the "activity-on- arrow" or the "activity on node" type and may be divided into separate pages with suitable notation relating to the interface points between the pages.

Individual pages shall not exceed thirty-six (36) by sixty (60) inch sheet size.

Notation on each activity arrow or node shall include a brief work description and duration estimate.

All construction activities and procurement shall be indicated in a time-scaled format and calendar scale shall be shown along the entire sheet length. Each activity arrow or node shall be plotted so that the beginning and completion days and free float time of said activity can be determined graphically by comparison with the calendar scale. All activities shall be shown using symbols that clearly distinguish between critical path activities and free float for each non-critical activity. All non-critical path activities shall show estimated performance time and free float time in scaled format.

2.6.8.7.4 Duration Estimates. - The duration estimates indicated for each activity shall be computed in working days, converted to calendar days, and shown on the construction schedule in calendar days, and shall represent the single, best estimate considering the scope of the Work and resources planned 746

Part 2 BD - 19
for the activity. Except for certain non-labor activities, such as curing of concrete, paint drying, procurement, or delivering of materials, activity duration shall not exceed ten (10) working days [fourteen (14) calendar days] nor be less than one (1) working day, unless otherwise accepted by the Engineer.

2.6.8.7.5 Schedule Reports. - Schedule Reports shall be prepared from the initial construction schedule and from all subsequent revisions of the schedule.

As a minimum, Schedule Reports shall contain the following data for each activity:

1. Activity numbers (or i-j numbers)

2. Estimated activity duration

3. Activity description (including procurement items)

4. Early Start date (calendar dated)

5. Early Finish date (calendar dated)

6. Late Start date (calendar dated)

7. Late Finish date (calendar dated)

8. Status (whether critical)

9. Total Float for each activity

10. Free Float for each activity

2.6.8.7.6 Project Information. - As a minimum, each Schedule Report shall include the following summary data:

1. Project name

2. Contractor name

3. Sequence or revision number or date

4. Project duration

5. Scheduled completion date

6. Date of commencement of the Work

7. Cite new completion date, if applicable

2.6.8.8 Schedule Monitoring. – At least once a month, and when specifically requested by the Engineer, the Contractor shall submit to the Engineer a computer printout of the latest updated Schedule Report for those activities that remain to be completed.

- END OF SECTION -
747

Part 2 BD - 20
SECTION 2.7 – MEASUREMENT AND PAYMENT

2.7.1 GENERAL

2.7.1.1 Payment. – Paragraph 2 of Subsection 7-3.1 of the Standard Specifications shall be amended to read as follows:

Payment for the various items of the Bid Schedule(s) shall include all compensation to be received by the Contractor for furnishing all tools, equipment, supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items of work being described, as necessary to complete the various items of the Work in accordance with the requirements of the Contract Documents, including all appurtenances thereto, and including all costs of permits and costs of complying with the regulations of any public agencies having jurisdiction over Contractor or the Work, including, but not limited to, the Safety and Health Requirements of the California Division of Industrial Safety and the Occupational Safety and Health Administration of the U.S. Department of Labor (OSHA).

No separate or additional payment will be made for any item that is not specifically set forth in the Bid Schedule(s), unless approved and covered by a subsequent Change Order(s) issued in accordance with the provisions of the Contract Documents and all costs for any such items shall be included in the prices named in the Bid Schedule(s) for the various appurtenant items of Work.

2.7.1.2 Progress and Final Payments. – Paragraphs 2 through 5 of Subsection 7-3.2. of the Standard Specifications shall be deleted in their entirety and the following substituted therefore:

In order to receive monthly progress payments for Unit Price Bid Schedule(s), for work performed to the established closure date, the Contractor shall submit to the Engineer a billing invoice and an attachment containing a correct list of estimated quantities and work completed by the Contractor for the applicable Unit Price Bid Items listed in the Bid Schedule(s). Such invoice shall also include a statement of accumulated working days. The estimated quantities and work completed shall be verified by the Engineer prior to processing payment.

In order to receive monthly progress payments for Lump Sum Bid Schedule(s), for work performed to the established closure date, the Contractor shall submit to the Engineer a billing invoice and an attachment containing a correct list of estimated quantities and work completed, in accordance with the Schedule of Values approved by the Engineer. Such invoice shall also include a statement of accumulated working days. The estimated quantities and work completed shall be verified by the Engineer prior to processing payment.

When the entire Project has been satisfactorily completed, the Contractor shall submit its final billing invoice and required detailed attachment to the Engineer for the required verification and preparation of the final estimate.
748

Part 2 BD - 21

Acceptance of any progress payment accompanying any estimate without written protest shall be an acknowledgment by the Contractor that the number of accumulated working days shown on the associated statement of working days is correct. Progress payments made by the City to the Contractor after the completion date of the Agreement shall not constitute a waiver of liquidated damages.

Subject to the provisions of Section 22300 of the Public Contract Code, , a ten percent (10%) retention will be withheld from each progress payment. All monthly invoices or payment requests, together with the required attachments detailing the number of days worked and estimates of quantities and work completed, shall be directed to and approved by the Engineer before submittal to the City for payment.

Pursuant to the provisions of California Public Contract Code Section 20104.50, should City fail to make any progress payment within thirty (30) days after receipt of an undisputed and properly submitted payment request (or invoice) from Contractor, City shall be liable to pay interest on such late payment equivalent to the legal rate set forth in subdivision (a) of Section 685.010 of the California Code of Civil Procedure. Upon receipt of an invoice or payment request from Contractor, the City shall: (1) review the invoice as soon as practicable after receipt to determine that the invoice is a proper payment request / invoice; and (2) return to the Contractor within seven 7 days of receipt any invoice / payment request the City determines to be improper, accompanied by a writing setting forth the reasons for City’s determination of impropriety. The number of days available to City to make a payment without incurring interest as set forth in this paragraph shall be reduced by the number of days the City exceeds the seven (7) day return period set forth in the previous sentence.

The Contractor shall submit with each invoice the Contractor's conditional waiver of lien for the entire amount covered by such invoice and valid unconditional waivers of lien from the Contractor and all subcontractors and materialmen for all work and materials included in any prior invoices. Waivers of lien shall be in forms prescribed by California Civil Code Section 3262. Prior to final payment by City, Contractor shall submit a final waiver of lien for Contractor's work, together with releases of lien from any subcontractor or materialmen.

2.7.2 SCHEDULING, MEASUREMENTS AND PAYMENTS

2.7.2.1 Initial Mobilization: - The following paragraphs shall be added to the end of Subsection 7-3.4 of the Standard Specifications:

Measurement for payment for Mobilization will be based upon completion of such work as a lump sum, non-proratable pay item, and shall require completion of all of the listed items during the first twenty-five (25) days following the Notice to Proceed.

Payment for Mobilization will be made at the lump sum allowance named in the Unit Price Bid Schedule(s) under the Bid Item, “Mobilization,” which price shall constitute full compensation for all such work. Payment for mobilization will be made in the form of a 749

Part 2 BD - 22
single, lump-sum, non-proratable payment. The Bid Item, “Mobilization,” will not be approved for payment until all mobilization items listed herein have been completed as specified. The scope of work included under the Bid Item, “Mobilization” shall include, but not be limited to, the following principal items:

1. Moving onto the site all Contractor’s plant and equipment required for first month’s operations.

2. Installing temporary construction power, wiring, and lighting facilities.

3. Establishing fire protection system.

4. Developing and installing a construction water supply per the Standard Specifications.

5. Providing on-site sanitary facilities and potable water facilities as specified per Cal-OSHA.

6. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer’s specified storage requirements and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.

7. Arranging for and erection of Contractor’s work and storage yard.

8. Posting all OSHA required notices and establishment of safety programs per Cal- OSHA and as required by the Standard Specifications.

9. Having the Contractor’s superintendent at the job site full time as required under the Standard Specifications.

10. Submittal of required Construction Schedule as specified in Subsection 6-1 of the Standard Specifications.

11. Submittal of Proposed Construction Schedule on or before the Preconstruction Conference, acceptable to the Engineer, per Subsection 6-1 of the Standard Specifications and Subsection 2.6.8 of these Special Provisions.

12. Submittal of detailed Preliminary Construction Schedule for the Engineer’s approval within seven (7) calendar days after the commencement date specified in the Notice to Proceed.

13. Submittal of an As-Planned Construction Schedule, embodying all corrections required by the Engineer, within thirty (30) calendar days of the date of the Notice 750

Part 2 BD - 23
to Proceed. No payment for mobilization can be made until this has been approved and submitted.

14. Providing and maintaining the field office trailers for the Contractor and the Engineer, complete, with all specified furnishings and utility services including telephones, telephone appurtenances, computer and printer, and copying machine per the Special Provisions.

15. Providing on-site communication facilities for the City and the Engineer, including telephones, radio pagers, and a FAX machine.

In addition to the requirements specified above, all submittals shall conform to the applicable requirements of the Standard Specifications.

No payment for any of the listed mobilization work items will be made until all of the listed items have been completed to the satisfaction of the Engineer. The aforementioned amount will be withheld by the City as the agreed, estimated value of completing all of the mobilization items listed. Any such withholding of money for failure to complete all such mobilization items as a lump sum item shall be in addition to the retention of any payments pursuant to the provisions of the Public Contract Code.

2.7.2.2 Demobilization - Measurement for payment for Demobilization will be based upon completion of such work as a lump sum, non-proratable pay item, and shall require completion of all of the Demobilization items listed herein.

Payment for Demobilization will be made at the lump sum allowance named in the Bid Schedule(s) under the Bid Item, “Demobilization,” which price shall constitute full compensation for all such work. Payment for Demobilization will be made in the form of a single, lump sum, non-proratable payment, no part of which will be approved for payment under the Agreement until all Demobilization items listed herein have been completed as specified. The scope of the work included under the Bid Item, “Demobilization” shall include but not be limited to the following principal items:

1. Provide and submit to the City a detailed written summary of the actual quantities of each bid item.

2. Complete clean up and remediation of all storage and staging sites.

3. Complete clean up and remediation, if required, of all haul routes utilized by Contractor’s vehicles.

4. Comply with all terms of the Construction Permit.

5. Submit complete “AS-BUILT” plans.

6. Complete the project punch list.
751

Part 2 BD - 24

2.7.2.3 Sheeting, Shoring, and Bracing or Equivalent Method. - Measurement for payment for temporary sheeting, shoring, and bracing, or equivalent method, will be based upon the completion of all planning, design, engineering, furnishing, and construction, and the removal and disposal of all such temporary sheeting, shoring, and bracing as a lump sum item, complete, as required under the provisions of any permits and in accordance with the requirements of OSHA and the Construction Safety Orders of the State of California, pursuant to the provisions of Section 6707 of the California Labor Code.

Payment for temporary sheeting, shoring, and bracing, or equivalent method, will be made at the lump sum price named in the Bid Schedule(s) under the Item, “Sheeting, Shoring, and Bracing, or Equivalent Method”, which price shall constitute full compensation for completion of all such work as required hereunder.

- END OF SECTION –

752

Part 2 BD - 25
SECTION 8 – FACILITIES FOR AGENCY PERSONNEL

8-1 GENERAL.

The following is hereby added to this Subsection 8-1 of the Standard Specifications:

No field offices for AGENCY personnel will be required, however, the AGENCY personnel shall have the right to enter upon the project at all times and shall be admitted to the offices of the Contractor for the project in the City if so provided by the Contractor for his own personnel.

SECTION 9 – CITY STANDARDS, STANDARD PLANS AND DRAWINGS

Section 9 is hereby added to the Standard Specifications as follows:

All public improvements, construction and dedications required and described in this manual shall conform to the standards and specifications of the City. Standards, Standard Plans and Drawings of the following agencies are used by the City of Lynwood and are part of the City’s standards. Where there is ambiguity or conflict between standards over which standard shall apply, the City Engineer shall determine what shall apply, and his determination shall be final.

All construction is subject to the approval of the City Engineer.

Standard Plans – Standard Plans for Public Works Construction, SPPWC, “Latest Edition and Supplement”.

Los Angeles County Public Works Department – Greybook and all plans except those modified or replaced by City Standards.

Los Angeles County Waterworks District - Applicable water.

Los Angeles County Flood Control District - Applicable storm drains.

Sanitation Districts of Los Angeles County - Applicable sewer and manholes.

State of California – California Department of Transportation (Caltrans) Standard Specifications
and Standard Plans - Pavement markings and traffic loops.

City Standards - All applicable standard plans.

Standard Specifications - The latest edition of, and applicable amendments to, the “Standard Specifications for Public Works Construction (SSPWC).”

California Manual on Traffic Control Devices (CA-MUTCD), “Latest Edition”.

American Water Works Association (AWWA), “Latest Edition”.

753

Part 2 BD - 26
SECTION 400 – PROTECT AND RESTORATION

400-1 GENERAL.

The second paragraph of Subsection 400-1 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall relocate, repair, replace or re-establish all existing improvements within the project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, etc.) which are damaged or removed as a result of the operations or as required by the Plans and Specifications.

Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectivity reduced by the Contractor’s operations, such striping or markings shall also be considered as existing improvements and the Contractor shall repaint or replace such improvements.

Reallocations, repairs, replacements, or re-establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re-establishing existing improvements shall be included in the bid.

400-2 PERMANENT SURVEY MARKERS.

The following is added after the first paragraph of this subsection of the Standard Specifications:

The Contractor shall reset distributed monuments and provide a Corner Record Survey filed with the County Surveyor and City engineer. Corner Record Surveys shall be completed by a Surveyor licensed in the State of California to practice surveying.

SECTION 402 - UTILITIES

402-1 LOCATION.

The agency did not perform any utility investigation. The Contractor shall be responsible to contact USA to mark all utilities and shall conduct this operation to protect all marked utilities in place. Any damaged utility line shall be repaired at the contractor sole expense. The price for protecting all utilities in place shall be considered as paid for in the various Bid items and no additional compensation shall be allowed thereafter.

754

Part 2 BD - 27

TEMPORARY TRAFFIC CONTROL

SECTION 600 – ACCESS

600-1 GENERAL.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor shall notify the occupants of all affected properties in writing at least forty- eight hours (2 working days) prior to any temporary obstruction of access. Vehicular access to the property shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

600-2 VEHICULAR ACCESS.

There are some driveways that require replacement in order to be American with Disabilities Act (ADA) compliant. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.

All driveways have to be open for access during project non-construction hours and days which may require use of plating and other devices or methods.

No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.

Under situations of driveway closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K- rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the Agency.

SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND

MAINTENANCE WORK ZONES

601-1 GENERAL.

This subsection is added to section 600-1 of the Standard Specifications:

Street closures will not be allowed except as specifically permitted by the Engineer. 755

Part 2 BD - 28
At the Pre-Construction meeting, the Contractor shall submit to the Engineer a detailed written plan for traffic control and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

601-3 TEMPORARY TRAFFIC CONTROL (TTC) ZONE DEVICES.

601-3.6 Channelizing Devices.
601-3.6.1 General.

Traffic lane transitions shall not be sharper than a taper of thirty to one.

Temporary traffic channelization shall be accomplished with barricades, K-rail sections or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finished pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

601-3.7 Traffic Sign Enhancement Devices.
601-3.7.1 General.

The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor, and deduct same from the next progress payment

601-5 TRAFFIC LANE WIDTHS AND CLEARANCES.

601-5.2 Lane Widths.

At least one twelve-foot wide traffic lane shall be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The Contractor must submit a traffic control plan to the City, signed by a registered traffic or civil engineer in the state of California, and obtain approval of same in writing from the City Engineer. The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

601-5.3 Clearances.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction. 756

Part 2 BD - 29
Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.

- END OF SECTION
757

Part 3 BD - 1

CITY OF LYNWOOD

PUBLIC WORKS DEPARTMENT

PART 3 – TECHNICAL PROVISIONS

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF

IMPERIAL HIGHWAY AND RUTH AVENUE
FY 2023-2024

PROJECT No. 4011.68.115

IN THE CITY OF LYNWOOD

758

Part 3 BD - 2

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF

IMPERIAL HIGHWAY AND RUTH AVENUE
FY 2023-2024

PROJECT No. 4011.68.115

TECHNICAL PROVISIONS

All Bid Items shall be in accordance with the Greenbook Standard Specifications for Public Works Construction (SSPWC) and Standard Plans for Public Works Construction (SPPWC), Latest Edition including supplements, State of California Caltrans Standard Plans and Specifications, Latest Edition, and the Special Provisions and General Conditions of these specifications.

Bid Item No. 1 – Mobilization/Demobilization (Not to exceed 3% of total of all other Prime Contract Bid Items)

Mobilization shall conform to the provisions of Sections 7-3.4 of the Standard Specifications.

Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to and from the project site necessary for work on the project and for all other work and operations which must be performed, or costs incurred including bonds, insurance, and financing prior to beginning work on the various contract items on the project site. Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the site, supervisory time on the job by the Contractor’s personnel to keep the construction site in a safe condition, and all other related work as required at all times and for all non-working days during the construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials. Demobilization includes removal of all equipment and materials from the site, clean up and restoration of the work site at the end of project. This bid item shall also include clearing and grubbing operations preceding and post construction consisting of removing all natural and artificial objectionable materials from the Right-of-Way in construction areas, road approaches, and material sites. Clearing and grubbing shall conform to the provision of section 300-1 of the standard specifications.

No additional amounts shall be paid for erosion control, Best Management Practices (BMP), erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil and other materials deposited on public streets by construction traffic.

Best Management Practices (BMP) shall be defined as any program, technology, process, citing criteria, operating method, measure, or device, which controls, prevents, removes, or reduces pollution. The Contractor shall obtain and refer to the California Storm Water Best Management Practice Handbooks, Volume 3, Construction BMP Handbook, and the 759

Part 3 BD - 3
Los Angeles County Department of Public Works Best Management Practices Handbook for Construction Activities.

Los Angeles County Department of Public Works
Cashier’s Office
900 South Fremont Avenue
Alhambra, CA 91803
Telephone: 626-458-6959

The Contractor shall have a minimum of two readily accessible copies of each publication on the Contract site at all times plus any copies of applicable environmental mitigation plans.

Additional BMPs may be required as a result of a change in actual field conditions, Contractor activities, or construction operation. When more than one BMP is listed under each specific BMP category, the Contractor shall select the appropriate and necessary number of BMPs within each category in order to achieve the BMP objective.

BMPs for Contractor activities shall be continuously implemented throughout the year and project time period. BMPs for erosion control and sedimentation shall be implemented during the period from October 15 to April 15, and whenever the National Weather Service Predicts rain within 24 hours. BMPs for erosion control and sedimentation shall also be implemented prior to the commencement of any Contractor activity or construction operation, which may produce run-off, and whenever run-off from other sources may occur.

The Agency (City), as a permittee thereto, is subject to enforcement actions by the State Water Resources Control Board, Environmental Protection Agency, and private citizens.

The Agency will pass through to the Contractor any penalty assessed by these entities for each calendar day that the Contractor has not fully implemented the BMPs specified for the Contract and/or is otherwise in noncompliance with these provisions. In addition, the Agency will deduct, from the final payment due the Contractor, the total amount of any fines levied on the Agency, plus legal and staff costs, as a result of the Contractor’s lack of compliance with these provisions and/or less than complete implementation of the specified BMPs.

Payment for Mobilization/Demobilization shall be included in the Lump Sum (LS) Price bid and shall be considered full compensation for obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility companies, private and public agencies and the City of Lynwood; and complying with the requirements specified in those licenses and permits; coordination, field office facility, implementation of Best Management Practices, and incidentals necessary to perform all related items of work. Progress payments for this bid item shall be paid for in accordance with the completion percentage of the project to the Contractor and shall include the cost of such mobilization administration during the entire contract period and demobilization. No additional compensation will be allowed therefor. The sum total of this Bid Item shall not exceed 3% of the total of all other Bid Items.

760

Part 3 BD - 4
Bid Item No. 2 – Traffic Control

Traffic Control, Traffic Control plan, construction signing and traffic maintenance shall comply with the provisions of Subsection 5-7, 600 and 601 of the Standard Specification, Subsection 56-2 of the Caltrans Standard Specifications, and the current requirements set forth in the “Manual of Traffic Controls for Construction and Maintenance Work Zones” published by the Department of Transportation, State of California, and California Manual on Uniform Traffic Control Devices (CAMUTCD), Latest Edition, by the Federal Highway Administration and California, the traffic control plans and these Special Provisions.

The Contractor shall maintain the following clearances from the edge of traffic lanes:

1) 5 feet to any excavation,
2) 2 feet to curbs or temporary concrete barriers,
3) 10 feet to poles and other obstructions on uncurbed roadways.

If determined by the Engineer that it is necessary to decrease these minimum distances to allow for the prosecution of the work, the Contractor shall provide all protective devices required by the Engineer to adequately protect the public.

PUBLIC CONVENIENCE

At the preconstruction meeting, the Contractor shall submit a detailed project schedule to the City for approval. Based on the project schedule, the Contractor shall notify residents and businesses of the proposed work and post temporary “NO PARKING” signs at no cost to the City. Signs shall be posted at all intersections, and on each side of the street a maximum of 200 or trees. All signs must be posted on delineators or stakes provided by the Contractor. The “NO PARKING” signs shall be in place not less than seventy two (72) hours prior to performing the work; therefore a request for changes in the schedule requiring additional posting shall be submitted by the Contractor for approval by the Engineer at least seventy-two (72) hours prior to reconstruction and paving the street. All conflicting parking signage shall be covered.

Due to the nature of this project involving major inconvenience to residents and businesses, a good Public Relations Program is mandatory and evidence of satisfactory past performance in this area will be required.

The Contractor is to distribute two (2) “Public Notice” to each residence and business affected by the project. The first notice shall be distributed ten (10) calendar days prior to the start of any work. The second notice shall be distributed at least seventy-two (72) hours prior to the start of work on a specific section of the street. A sample copy of the notice must be approved by the City. Said notice shall be attached to a red information hanger provided by the Contractor and hung on the gate or front door knob. The Contractor shall also coordinate with the bus services to ensure the safe operation of buses and access to bus stops in the construction area. Notices shall be in English and Spanish languages.

The Contractor shall also coordinate with the street sweeping, trash disposal and postal 761

Part 3 BD - 5
services agencies to ensure the safe operation of their vehicle and access in the construction area.

All complaints received by the City associated with the construction project alleging damage to private property and vehicles shall be responded to by the Contractor within twenty-four (24) hours of notification. Failure to comply with this provision may result in a penalty of One Hundred dollars ($100.00) per occurrence.

All trucks, which the Contractor proposes to use, that exceed the legal load limit when loaded will be required to have overweight permits issued by the City.

The Contractor shall be responsible for adequate barricading of the work area and controlling of traffic in the vicinity of the project as specified in Subsection 7-10 of the General Provisions

PROTECTION OF WORK AND PUBLIC

The Contractor shall take all necessary measures to protect work and prevent accidents during any and all phases of the work. The Contractor shall repair all damaged pavement as a result of damage (i.e., vehicle tracks, footprints, graffiti, etc.) If deemed necessary by the City, the Contractor shall repair the defective area in accordance with these special provisions.

CONSTRUCTION SIGNING

Construction signing shall consist of furnishing, installing, maintaining and removing construction signs and barricades as required by the “California Manual on Uniform Traffic Control Devices”, CAMUTCD. The traffic control system shall be installed on a road prior to starting work for that road and shall not be removed until all work has been completed on that road. Existing speed limit signs, which conflict with the work zone speed limit, shall be covered during the entire construction period.

TRAFFIC MAINTENANCE

The Contractor shall be responsible for handling vehicular and pedestrian traffic in accordance with Subsection 601 of the Standard Specifications and these Special Provisions.

The Contractor shall prepare all necessary traffic control plans and submit to the City for approval at the pre-construction meeting. The traffic control plans shall be prepared by a California Licensed Traffic Engineer and shall show:

1. Notification Signs.

2. Existing and temporary lane lines.

3. Dimensions of the work zone and street improvements.

4. Advance warning signs.

5. Delineators
The plans shall be submitted to the City at the preconstruction meeting prior to 762

Part 3 BD - 6
commencing work and shall incorporate a complete and separate plan for each stage of construction proposed by the Contractor. This plan shall indicate the sequence of lanes or portions of lanes being closed for each phase. The traffic control plans shall indicate the travel plan for each phase of construction. The traffic control plans shall state:

1. That the plan will conform to “California Manual on Uniform Traffic Control Devices (CAMUTCD)”.

2. Emergency contact person and phone number.

3. Minimum lane widths and minimum clearance to obstructions.

The traffic control plan shall be approved by the Engineer prior to beginning any removals.

The Contractor shall cooperate with the Engineer relative to handling traffic through all work areas and shall make his own arrangements relative to keeping the working area clear of parked vehicles and maintaining clear access to driveways.

The Contractor shall furnish and install construction notification signs as shown on traffic control plans and as specified by the City of Lynwood.

The Contractor shall provide for controlled pedestrian crossings through the work.

Crossings shall provide pedestrians a means of passing over or through the work without tracking tack coat or hot asphalt concrete or P.C.C. work or endangering pedestrian safety.

All temporary pedestrian crossings shall be in compliance with the latest Americans with Disabilities Act design standards and supplements.

At intersections, if a cross road needs to be temporarily closed when work is in progress through the intersection and the anticipated traffic delay is more than five (5) minutes, a detour sign shall be installed on the cross street and shall include the installation of advance signing displaying the anticipated delay time. The signing of the detour route shall be approved by the Engineer prior to installation of the detour and closure of the road.

The Contractor shall provide for one lane of travel in each direction at all times unless approved by the Engineer. When two-way traffic is restricted to one lane in each direction, and when applying paving past intersecting roads, traffic shall be controlled as required by the “California Manual on Uniform Traffic Control Devices”, CAMUTCD. A pilot car and driver will be required at various locations if control by flaggers and/or control devices proves deficient in the opinion of the Engineer. In no case shall the Contractor provide less than one (1) lane of travel in each direction through the construction zone including cross- streets.

Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way at any time. Overnight parking of construction equipment shall be confined to an approved storage site selected by the Contractor and approved by the City.

763

Part 3 BD - 7

TEMPORARY GUIDE MARKERS

Temporary guide markers shall be portable Caltrans, Standard Specifications approved delineators. Only one type of temporary guide marker shall be used on any road at any one time.

Temporary guide markers shall be placed adjacent to the edge of all vertical lips or excavations that exceed 3/4 inches. If the temporary guide markers are damaged, or are not in an up-right position, from any cause, said markers should immediately be replaced or restored to their original locations, in an upright position by the Contractor.

PORTABLE DELINEATORS

The vertical portion of the portable delineators shall be brilliant orange or predominantly orange in color. The posts shall be not less than 100 square inches, measured through the vertical axis of the delineator, normal to the roadway. The minimum height shall be thirty-seven (37) inches above the traveled way.

Two 4-inch nominal width reflective bands shall be mounted a minimum of 1 ½ inches apart and at a height on the post so that one reflective band will be between 2.5 feet and 3 feet above the roadway surface.

Reflective bands shall be flexible vinyl plastic, either white or yellow, and shall have not less than the following dry reflective values at a 0.2 degree divergence angle, expressed I units if candlepower per foot-candle per square foot. The wet reflective values shall not be less than ninety percent (90%) of the dry values.

Dry Reflective Value

Angle of Incidence 4º 5º 30º White 250 165 50
Yellow 10 110 50

All tests for reflective values shall be performed in accordance with California Test Method No. 642.

The portable delineators shall be spaced as necessary for proper delineation; however, in no case shall the spacing between portable delineators exceed thirty (30) feet on tangents or twenty (20) feet on curves.

FLUORESCENT TRAFFIC CONES

Provide lighted flashers and lighting for night time. Traffic cones shall be fluorescent, new or reconditioned and of good commercial quality, flexible material suitable for the purpose intended. The outer section of the portion above the base of the cone shall be highly pigmented fluorescent orange polyvinyl compound. The overall height of the cone shall be 764

Part 3 BD - 8
anchored in a manner such that the traffic cone will remain in an upright position.

The fluorescent traffic cones shall be spaced as necessary for proper delineation; however, in no case shall the spacing between fluorescent cones exceed thirty (30) feet on tangents or twenty (20) feet on curves.

STRIPING

Temporary striping and marking for traffic control shall conform to Section 310-5.6.5 of the Standard Specifications. Temporary striping and marking which has no further use shall be removed by wet sandblasting, and all sand used in sandblasting shall be removed without delay as the sandblasting operation progresses.

RESTRICTIONS ON CLOSURE OF STREETS AND TRAFFIC LANES

The Contractor shall conduct all operations so as to provide access to the adjoining properties and have no greater length or quantity of work under construction that can be properly prosecuted with a minimum of inconvenience to the public.

The Contractor shall construct temporary A.C. ramps or equal to provide safe and drivable access to residents and business properties daily.

The Contractor shall coordinate all shipments and deliveries to businesses. If steel plates are required, they shall be provided by the Contractor at no additional cost to the City.

The Contractor shall be responsible for furnishing, placing and maintaining barricades and lights as necessary to protect the public from danger due to the work being done.

No additional amounts shall be paid for erosion control, erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil deposited on public streets by construction traffic.

Payment for Traffic Control shall be included in the Lump Sum (LS) price base and shall be considered full compensation for providing safe traffic control including all temporary signs, striping, and delineation, preparing and providing traffic control plan during the project, obtaining all approvals and permits, as required, from all related agencies, including, but not limited to, public agencies and the City of Lynwood; and complying with the requirements specified in those licenses and permits, coordination, field office facility; and incidentals necessary to perform all related items of work.

Bid Item No. 3 – Remove Planting Area and Native Soil(Unclassified Excavation) to Provide Clear Depth for Improvements

In addition to the work outlined in the Standard Specifications for Public Works Construction Section 300-2, the following items of work are included:

765

Part 3 BD - 9
A. Removal, hauling, and disposal of existing soil and native material all within the project site and as shown on the plan or directed by the Engineer.

B. Removal of excess material from excavation, disposal of debris, shrubs, roots, rubbish and excess material away from site.

C. Maintaining dust control at all times by watering.

D. Removal and disposal of any additional items not specifically mentioned herein, which may be found within the work limits or are shown on the plans to be removed.

E. Restoration and clean-up of the site.

F. Protecting in place of existing water mains, sewers, storm drains, meters, valve covers, walls, fences, curbs, fire hydrant, telephone and power poles, and other existing structures.

G. Removing and relocating all sprinkler lines, heads, valves, etc. interfering with construction of improvements.

H. All materials removed will be lawfully disposed of at a site secured by the Contractor.

The Contractor will make effort to recycle excavated and demolition materials. The Contractor will provide the Engineer with a letter indicating the final disposition of all excavated and demolition materials from the project within five (5) working days after project completion.

I. No excavated or demolition materials shall be left in the public right of way overnight.

J. Temporary support of all sloped and vertical plains of excavation. Shoring where needed shall be placed to protect existing improvement including adjacent properties.

Temporary shoring design is Contractor responsibility and shall be done by a Registered Engineer. The contractor shall submit the calculation to the City’s Building and Safety Department prior commencement of the construction.

The Contractor shall be aware that the underlying materials underneath the AC and concrete pavement, curb and gutters, longitudinal gutter, alley intersection, and sidewalk can be aggregate base, miscellaneous bas,e or native soil. For the purpose of this project the underlying materials are classified as unclassified excavation.

It is the Contractor’s responsibility to do whatever subsurface exploration is required to do a complete removal to the grades required.

The Contractor shall prepare the subgrade in accordance with the Standard Specifications for Public Works Construction and to the satisfaction of the City Engineer, prior to placing the improvements. This item shall include excavation, backfill, disposal of excess materials, and fine grading required. Removal of any underlying existing improvements shall be to the lines as shown on plans or as directed by the City Engineer.

The subgrade preparation shall conform to Section 301-1 of the Standard Specifications for Public Works Construction. Unless otherwise specified, soil in the paved area shall be compacted to a relative compaction of ninety (90) percent by a suitable means of compaction.

766

Part 3 BD - 10
Final subgrade elevations shall be confirmed by survey elevations per Standard Specifications for Public Works Construction.

Payment for Remove Planting Area and Native Soil to Provide Clear Depth for improvements (Unclassified Excavation) shall be at the contract unit price per Cubic Yard (CY) and shall be considered full compensation for complying with the above requirements. Furnishing of labor, materials, equipment, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 4 – Sawcut and Remove Existing Concrete Sidewalk

This Bid Item shall include all labor, material and equipment required to Sawcut, remove, haul away and properly dispose of existing concrete sidewalk and sub-grade compaction. Removal of concrete sidewalk as shown on the Contract Drawings shall conform to Subsections 401-3.2 of the Standard Specifications for Public Works Construction.

Sawcut ting shall be accomplished by the use of a power-driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete sidewalk is constructed. The exact location of side walk removal shall be approved by the City Engineer in the field. Generally, sawcuts shall be on existing joints or score mark.

All necessary sawcutting of existing concrete sidewalks shall be to the lines as required by the City Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

This item shall include root clearing and/or tree root removal of the sections immediately adjacent and underneath sidewalk in order to bring new sidewalk to final finish grade. Full compensation for root clearing and tree root removal shall be included in the unit price of sidewalk and no further compensation shall be made.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb, and gutter, pull boxes, utility boxes, and etc. in place per section 400-1 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of City Engineer without any additional compensation. All materials to be removed as indicated on the plans shall be disposed of at a legal site as specified in subsection 401-5 of the Standard Specifications for Public Works Construction.

Payment for Sawcutting and Removal of Existing Concrete Sidewalk shall be at the contract unit price per Square Foot (SF) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, Sawcut ting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade 767

Part 3 BD - 11
compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 5 – Sawcut and Remove Existing Concrete Curb & Gutter

This Bid Item shall include all labor, material, and equipment required to sawcut, remove, haul away and properly dispose of existing concrete curb and gutter, and sub-grade compaction, base, and native soil to provide a clear area for construction of new improvements. Removal of concrete curb and/or gutter as shown on the Contract Drawings, shall conform to Subsection 401-3.2 of the Standard Specifications for Public Works Construction.

Sawcutting shall be accomplished by the use of a power-driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean saw-cut edge shall be maintained until new concrete curb and gutter is constructed. The exact location of curb and gutter removal shall be approved by the City Engineer in the field. Generally, saw-cuts shall be on existing joints or score mark.

All necessary saw-cutting of existing concrete curb and gutter shall be to the lines as required by the City Engineer. Saw-cutting shall be included in the unit price and no further compensation shall be made.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and/or gutter, pull boxes, utility boxes, etc. in place per section 400-1 of Standard Specifications for Public Works Construction.

All damages to these items shall be fixed to the satisfaction of City Engineer without any additional compensation. All materials to be removed as indicated on the plans shall be disposed of at a legal site as specified in subsection 400-1 of the Standard Specifications for Public Works Construction and the Engineer’s approval.

Removal of two-feet-wide strip of AC pavement along curb and gutter for forming and the placement of a new curb and gutter or new curb ramp is included in this removal bid item and no additional compensation will be allowed.

Payment for Sawcut and Remove Existing Concrete Curb and Gutter shall be at the contract unit price per Linear Foot (LF) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

768

Part 3 BD - 12
Bid Item No. 6 – Sawcut and Remove Concrete Curb Ramp

This Bid Item shall include all labor, material and equipment required to remove existing concrete curb ramp and/or sidewalk, curb and/or gutter or paving, planting area, base, subgrade, and all existing improvements that may affect a new curb ramp, and haul away to provide clear area for construction of new curb ramp. Removal of PCC curb ramp as shown on the construction plans shall conform to Subsection 401-3.2 of the Standard Specifications for Public Works Construction.

This item shall also include removal and disposal of unsuitable subgrade soil excavated for the placement of a new curb ramp. All boundaries limits will be approved by the Engineer prior to saw-cutting. The Contractor shall exercise care in removing existing concrete so as not to damage adjoining areas which are to remain in place and any damage so caused shall be replaced by the Contractor at his own expense.

Actual limit of concrete removal shall extend to nearest score mark or joint if nearest score mark or joint is within 3’ limit of removal. Residual from any saw-cutting shall be removed by vacuum. The downstream drain inlet shall be protected. In no case shall the residual be allowed to enter the storm drain system.

Sawcutting shall be accomplished by the use of a power-driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete Curb Ramp is constructed. The exact location of curb ramp removal shall be approved by the City Engineer in the field. Generally, sawcuts shall be on existing joints or score mark. Existing curb ramps, including adjacent curb and gutter shall be saw-cut and removed to the limits of the existing curb ramp or the limits of the new curb ramp whichever is greater.

Contractor shall mark all saw-cut lines and obtain City approval for saw-cutting prior to any saw-cutting, and sawcut and remove the asphalt concrete pavement parallel to the centerline of the roadway for the length of curb ramp and gutter section including a minimum Two-feet (2’) of width adjacent to the edge of gutter for forming the curb ramp and gutter.

All necessary sawcutting of existing concrete Curb Ramp or any existing improvements shall be to the lines as required by the City Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

This item shall also include removal and disposal of unsuitable subgrade soil excavated for concrete curb ramp, root pruning and/or tree root removal of the sections adjacent and underneath curb ramp in order to bring new curb ramp to final finish grade. Full compensation for root pruning and tree root removal shall be included in the unit price of curb ramp and no further compensation shall be made.

769

Part 3 BD - 13
It is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 300-1.2. All damages to these items shall be fixed to the satisfaction of City Engineer without any additional compensation.

Removal and backfill of Two-feet (2’) wide strip of AC pavement or concrete gutter spandrel adjacent to the curb ramp for the construction of a new curb ramp is included in this bid item and no additional compensation will be allowed. The AC pavement shall be C2-PG 64-10 or per the City Engineer approval.

Payment for Sawcut, Remove and Construct Concrete Curb Ramp (or portion thereof) shall be at the contract unit price per Each (EA) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, tools, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, truncated detectable warning surface, backfilling, compacting, forming, finishing, curing, temporary ramp, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 7 – Prune Overhead Tree Branches

Prune overhead tree branches shall confirm to Sub-section 300-1 of SSPWC. Prior to any work on any tree the Contractor shall provide a Certified Arborist report and in accordance with “Pruning Standards,” published by the Western Chapter of the International Society of Arboriculture to assure the pruning of tree do not cause the tree to die or compromise the stability of the tree.

The Contractor shall place a visible removal mark on the tree branches prior to trim; Inspector shall approve the trim of tagged branches within three (3) working days after tagging. The Contractor shall trim the branches to provide clear visibility to the traffic signal head and signs per the Engineer approval. Tree shall be trimmed in a workmanlike manner so as not to injure other standing trees or improvements to be preserved. Contractor shall remove the tree branches and dispose them properly. All debris from removing tree shall be cleaned up and hauled away from the work site on the same day that the tree is trimmed.

Payment for Prune Tree Overhead Branches including removal of branches shall be made on Each (EA) Unit Price and shall include full compensation for furnishing all labor, materials, tools, equipment, hauling, disposing and incidentals and for doing all the work involved complete in place, as shown on the drawings and directed by the City Engineer and certified Arborist, as specified in these Special Provisions.

Bid Item No. 8 – Remove Existing Tree

For trees indicated on the project drawings for removal, the Contractor shall place a visible removal “tag” on these trees prior to removal; Inspector shall approve the removal of tagged tree within three (3) working days after tagging. Tree shall be removed in a workmanlike manner so as not to injure other standing trees or improvements to be 770

Part 3 BD - 14
preserved. Contractor shall remove the tree, stump, and all roots larger than 1-1/2 inches in diameter to 36 inches below grade for tree indicated for removal on the drawings. Any water lines to remain shall be protected in place. Hole created from removal of tree stump shall be backfilled and graded to finish level by the end of the workday. All debris from removing tree shall be cleaned up and hauled away from the work site on the same day that the tree is removed.

Tree removal shall be performed by a Certified Arborist and in accordance with “Pruning Standards,” published by the Western Chapter of the International Society of Arboriculture.

The Arborist can be a person in the employment of the Contractor as long as the person has been certified by the Western Chapter of the International Society of Arboriculture.

The Certified Arborist shall be approved in advance by the Engineer, and all removal shall be done in the presence of the Engineer.

Payment for Remove Existing Trees shall be made per Each (EA) at the unit price bid in the contract prices bid and include full compensation for removing, furnishing all labor, tools, equipment, sawcutting, hauling, properly disposing of materials and incidentals for doing all the work involved complete in place. No additional compensation will be allowed therefor.

Bid Item No. 9 – Remove and Salvage Existing Sign and Post

This Bid Item shall include all labor, material, and equipment required to remove, haul away and properly dispose of existing sign(s), post, footing, base, sub base, its appurtenance, and native soil. Removal of existing sign or signs, post, and underlying materials as shown on the plans shall conform to Subsection 401 of the Standard Specifications for Public Works Construction. Any removal of the footing, base, and sub base shall be backfilled with material equal to or better in quality and to the same thickness as the surrounding materials. Removal of existing post, and all other equipment shall be included in this bid item and no additional compensation will be allowed.

Payment for Remove and Salvage Existing Sign and Post shall be at the contract unit price per Each (EA) and shall be considered full compensation for complying with the above requirements. Furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, backfill, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 10 – Remove Existing Streetlight, Footing, Pull Boxes, Conduits and Wires

This Bid Item shall include all labor, material and equipment required to remove, haul away and properly dispose of existing street light, base, footing, base, sub base, its appurtenance and native soil to provide a clear area for new improvements. Removal of existing street light and underlying materials as shown on the Contract Drawings shall conform to Section 401 and other related sections of the Standard Specifications for Public Works Construction.
771

Part 3 BD - 15

Removal of street lights shall include, but not limited to, coordinate with SCE local planners, removal of lighting fixtures, post, any street signs mounted on post, foundation and electrical wiring. Lighting system shut down shall not interfere with regular lighting schedule, unless otherwise permitted by the Engineer. Trenches, holes, depressions, and pits caused by the removal of street lights, shall be backfilled with material equal to or better in quality and to the same thicknesses as the surrounding materials. Materials from existing facilities which are specified to be salvaged shall conform to Section 15-2.04 of Caltrans Standard Specifications. Where damage is caused by the Contractor’s operations, the Contractor shall, at the Contractor’s expense, repair and replace damaged facilities. The Contractor may be instructed by the City to deliver all salvaged streetlight equipment from this project to the City's Public Works facilities.

Payment for Remove Existing Streetlight, Footing, Pull Boxes, Conduits and Wires shall be paid for at the contract unit price per Each (EA) and shall be considered full compensation for complying with the above requirements. Furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, backfill, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 11 – Remove and Existing Flashing Beacon post assembly, Footing, Pull Boxes, Conduits and Wires

This Bid Item shall include all labor, material, and equipment required to remove, haul away and properly dispose of existing flashing beacon post assembly, sign(s), footing, base, sub base, its appurtenance, and native soil. Removal of existing flashing beacon post assembly, and underlying materials as shown on the plans shall conform to Subsection 401 of the Standard Specifications for Public Works Construction. Any removal of the footing, base, and sub base shall be backfilled with material equal to or better in quality and to the same thickness as the surrounding materials. Removal of existing post, and all other equipment shall be included in this bid item and no additional compensation will be allowed.

Payment for Remove and Salvaging Existing Flashing Beacon Post assembly shall be at the contract unit price per Each (EA) and shall be considered full compensation for complying with the above requirements. Furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, backfill, grading, sub-grade compaction, restoration, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 12 – Protect Existing Flashing Beacon assembly, Remove Flashing Beacons, and Replace School Crossing sign with an Internally Illuminated Signal Ahead sign.

This Bid Item shall include all labor, material, and equipment required to replace the existing mast arm School Crossing Warring sign with an internally illuminated Signal Ahead sign. The Contractor shall remove the existing flashing beacons and modify the 772

Part 3 BD - 16
wiring to provide a constant power to the proposed internally illuminated Signal Ahead sign. The size and shape of the sign shall be per Caltrans standards and to be approved by the Engineer.

Payment for protecting existing Flashing Beacon post assembly, footing, pull boxes, conduits, and replace the School Crossing sign with an Internally Illuminated Signal Ahead sign shall be at the contract unit price per Each (EA) and shall be considered full compensation for complying with the above requirements to the satisfactory of the Engineer. Furnishing of labor, materials, equipment, removal, hauling, properly disposing, protection of facilities, restoration pole and mast arm, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 13 – Relocate Water Valve.

This Bid Item shall include all labor, material and equipment required to relocate the existing water valve assembly and remaining appurtenances. Contractor shall deliver all salvaged valve and appurtenance to the City Yard.

The relocation of water valve cans, tees, crosses, and pipe and covers shall be in accordance with LACWD Standard plans and Section 403-3 of the Standard Specifications, with applicable modifications for water valve cans and covers. The Contractor is to contact the water utility (and City Engineer) and determine location the utility wants the Contractor to relocate the water valves sleeves and covers or the water utility will do so on its own. In the latter case the Contractor will not be paid for this work. Contractor shall use new water valve assembly. All new water valves must be installed away from the ramp. Contractor to match existing valve size when replacing and relocating away from the ramp.

Payment for Relocate Water Valve assembly shall be at the contract unit price per Each (EA) and shall include full compensation for furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, backfill, grading, sub-grade compaction, restoration, all incidentals and no additional compensation will be allowed therefor.

Bid Item No. 14 – Relocate Existing Fire Hydrant Assembly and Service Line

This Bid Item shall include all labor, material and equipment required to relocate the existing Fire Hydrant Assembly, Fire service line, valve, and other appurtenances.

Contractor shall deliver all salvaged appurtenances to the City Yard.

The bid item is also for furnishing and installing new fire hydrant assembly, lateral service line, and blue reflective marker per City of Lynwood Standards, and as shown on the plans. The work under this item shall include the cost of but not limited to pavement cutting and removal, excavating, shoring, tunneling, furnishing and placing concrete thrust block under pipe, furnishing and installing pipe, couplings, restrained joints, gate valve, valve can, tapping or hot tap connection as directed by the City 773

Part 3 BD - 17
Engineer, mechanical joint, and cover, slurry backfilling, temporary and permanent pavement resurfacing, traffic control, flushing and disinfecting, bacteria test, flow test, hydrostatic test, removal and replacement where required of existing improvements (exclusive of utilities) which interfere with construction (includes all existing improvements located outside the traveled roadway, such as concrete curb and gutter, sidewalk, driveways, sprinklers, parkways, etc.), disposing and salvaging of respective pipe, materials and concrete or thrust blocks, disposing of all excess excavated or removed material, and all other labor, equipment and material incidental to the installation of fire hydrant assembly, complete in place. Where a valve assembly is installed within concrete gutter, the Contractor shall replace a minimum of 6 linear feet of curb and gutter, in kind, with no additional compensation. Re-sod all lawns that may have been damaged or removed using suitable topsoil.

In general, the size of fire hydrants shall have at minimum one 4 ½ inch outlet and two 2 ½ inch hose outlets with National Standard Thread unless otherwise noted on approved plans and have a working pressure and shall conform to AWWA C502 standards and be approved by City Engineer.

Upon completion of Fire Hydrant installation, and after the field tests have been performed, the fire hydrant shall be operated in the presence of the City Engineer.

Operation shall consist of the installation of appropriate BMPs at the water flow course prior to opening the fire hydrant assemblies and allowing water to flow freely from one or more of its outlets. Upon completion of this sequence the fire hydrants shall be turned off and all protection caps properly placed on each outlet.

Payment for Relocate Existing Fire Hydrant Assembly and Service Line shall be at the contract unit price per Each (EA) and shall include full compensation for removing, disposing, delivering salvaged appurtenances to the City Yard, furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, finishing, testing, hauling, proper disposing, and incidentals for doing all the work installing, complete in place and no additional compensation will be allowed therefor.

Bid Item No. 15 – Construct Concrete Sidewalk (4”-Thick)

This Bid Item shall include all labor, material, and equipment required to place concrete sidewalk for the project. Concrete sidewalk shall conform to the provisions of Section 303- 5 of the Standard Specifications, Standard Plans for Public Works Construction and the Street Improvement Plans made part of these Specifications. Concrete shall be Class 520- C-2500 as specified in Section 201-1.1.2 of the Standard Specifications. Concrete sidewalk shall be a minimum 4” thick per the Standard Plans for Public Works Construction 112-2 and 113-2.

Concrete sidewalk shall be constructed to the line, grades and designs shown on the plans. Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.

774

Part 3 BD - 18
Payment for concrete sidewalk shall conform to the provisions of Subsection 303-5.9 of the Standard Specifications for Public Works Construction.

Payment for Construct Concrete Sidewalk shall be at the contract unit price per Square Foot (SF) and shall include full compensation for furnishing all labor, materials, tools, equipment, backfilling, grading, compaction, forming, pouring, finishing, hauling, properly disposing, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed therefor.

Bid Item No. 16– Construct Concrete Curb Ramp with Detectable Warning Surface This Bid Item shall include all labor, material, and equipment required to construct concrete curb ramp including adjacent sidewalk, curb and/or gutter, planting area, base, sub-base, and adjacent AC work complete in place for the project. Concrete curb ramp shall conform to the provisions of Section 201-1 of the Standard Specifications for Public Works Construction and shall be placed in accordance with Section 303-5 of the Standard Specifications for Public Works Construction.

Concrete curb ramp shall be per Standard Plans for Public Works Construction, Standard Plan 111-5, case and type per plans or per City Engineer’s instruction.

Concrete Curb Ramp shall be constructed to the line, grades and design shown on the plans or as ordered by the Engineer. Existing surfaces to be joined shall be Sawcut on a neat, straight line at the join location. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.

Truncated, detectable warning surface shall be 4’ wide and 3’ long minimum. A sample of material and color shall be approved by the City Engineer prior to installation. Provision and installation of truncated detectable warning surface is a part of curb ramp construction, and no further compensation will be allowed. Existing pull boxes within the curb ramps shall be relocated and no additional compensation will be allowed.

The new curb ramp to join the existing concrete cross gutter shall be doweled with No. 5 bars of 18-inch in length to existing gutter spandrel on grade. The contractor shall drill holes on the edge of concrete spandrel with 12” spacing on center and install High Strength Epoxy Tie Adhesive bars in the holes.

The curing of Portland cement concrete pavement shall conform to the provisions of Section 303-1.10 and 303-5.6 of the Standard Specifications for Public Works Construction. The application of the sealing compound shall be in accordance with the requirements of Section 90-7.01B of the State Standard Specifications.

During construction of curb ramp, convenient temporary approaches to crossings or intersecting the street shall be provided and kept in good condition. The temporary access shall not be closed until the replacement curb ramp are usable. 775

Part 3 BD - 19
Payment for concrete curb ramp shall conform to the provisions of Subsection 303-5.9 of the Standard Specifications for Public Works Construction.

Payment for concrete curb ramp shall conform to the provisions of Subsection 303-5.9 of the Standard Specifications for Public Works Construction.

6” thick compacted Crushed Miscellaneous Base (CMB) under the curb and gutter shall be paid under a separate Bid Item.

Payment for removal and backfill two-foot (2’) wide AC pavement strip along the curb and gutter shall be included in this bid item of work and no additional compensation will be allowed. The AC pavement shall be C2-PG 64-10 or per the City Engineer approval.

Payment for Construct Concrete Curb Ramp with Detectable Warning Surface shall be at the contract unit price per Each (EA), and shall include full compensation for furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, forming, pouring, finishing, hauling, proper disposing, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Bid Item No. 17 – Provide and Place 6"-Thick Crushed Miscellaneous Base (CMB) Crushed Miscellaneous Base (CMB) shall be in conformance with the requirements specified in Section 200-2.4 for untreated base material of the Standard Specifications and shall be placed and compacted per plans and specifications and per Section 301 of Standard Specifications for Public Works Construction.

Payment for placing crushed miscellaneous base shall conform to the provisions of Subsection 301-2.4 of the Standard Specifications for Public Works Construction.

Compacted Crushed Miscellaneous Base (CMB) under the concrete improvement items shall be paid under this Bid Item.

Payment for Provide and Place 6” Thick Crushed Miscellaneous Base (CMB) shall be at the contract unit price per Tonnage (TON), shall include full compensation for furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, finishing, hauling, disposing, and incidentals and for doing all the work involved complete in place and no additional compensation will be allowed therefor.

Bid Item No. 18 – Traffic Signal System Installation

The lump sum bid price for each of these traffic signal installations shall include all labor, material, and equipment required to have a complete and fully operational traffic signal system in place. The following technical provisions shall apply to the traffic signal system installation at the intersection. The Bid Item shall be in accordance with the Greenbook Standard Plans and Specifications for Public Works Construction (SPPWC & SSPWC), latest editions, including supplements; State of California (Caltrans) Standard Plans and 776

Part 3 BD - 20
Specifications, latest edition; and the Special Provisions and General Conditions of these specifications.

A. DESCRIPTION OF WORK

The following is hereby added to this subsection of the Standard Specifications:

This work consists of furnish and install traffic signal systems, installing conduit, pull boxes, cables, signal heads, signal poles, internally illuminated street name signs, mast arm signs, push bottom per the plans and details shown on the Signal Construction Plans, at the offset intersection of Imperial Highway and Ruth Avenue/Stockwell Drive Intersection.

This work shall be performed in accordance with the most current edition of Caltrans Standard Plans.

Furnishing and installing traffic signal and safety lighting systems shall conform to the provisions in Section 700 of the standard specifications for public works construction, the “Greenbook”, 2021 edition, (Herein after called SSPWC), Caltrans Section 86 "General" and Section 87 “Electrical Systems” of the California Department of Transportation Standard Specifications (Caltrans), 2022 Revised Standard Specifications (hereinafter called State Standard Specifications) and 2012 Revised Standard Plans, and the most current edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the special provisions of these specifications, except as noted in the Special Provisions and on the plans. Copies of these documents are available from Caltrans, District 7 office at 100 South Main Street, Los Angeles, CA 90012 or Caltrans Headquarter Publication Distribution Unit, 1900 Royal Oaks Drive, Sacramento, CA 95815, tele (916) 445-3520.

The Contractor shall protect all existing nearby traffic signal equipment, controllers, cabinets, pull boxes, loop detectors, conduit, and interconnect/signal cable as part of the new signal installation work. It is also the responsibility of the Contractor to coordinate with City of Lynwood and Southern California Edison for the shut down and turn on of the traffic signals. The identification of SCE power source and connection design to provide power to service cabinet must be completed in coordination with and by SCE local planners as early as possible in order to avoid delays.

In case of conflict between the Standard Specifications and these Special Provisions, the Special Provisions shall take precedence over and be used in lieu of such conflicting portions.

Wherein Section 86 reference is made to other sections of the State Standard Specifications, these sections are hereby included unless otherwise specified. The Standard Specifications for Public Works Construction and its supplements and these special provisions shall be applied.

777

Part 3 BD - 21
The following special provisions are supplementary and in addition to the provisions of the State Standard Specifications, and are only called out if elaborations, amendments, specifying of options, or additions are required.

Equipment List and Drawings
Equipment list and drawings of electrical equipment and material shall conform to the provision in Section 86-1.01C, "Submittals" of the State Standard Specifications and these special provisions:

The controller cabinet schematic wiring diagram and intersection sketch shall be combined into one drawing so that when the cabinet door is fully opened, the drawing is oriented with the intersection.

The Contractor shall furnish 3 copies of the maintenance manual for all controller units, auxiliary equipment and vehicle detector sensor units, control units and amplifiers. The maintenance manual and operation manual may be combined into one manual. The maintenance manual or combined maintenance manual and operation manual shall be submitted at the time the controllers are delivered for testing or, if ordered by the Engineer, previous to purchase. The maintenance manual shall include, but need not be limited to, the following items:

1. Specifications

2. Design Characteristics

3. General operation Theory

4. Function of all Controls

5. Troubleshooting Procedures (Diagnostic Routines)

6. Block Circuit Diagram

7. Geographical Layout of Components

8. Schematic Diagrams

9. List of Replaceable Component Parts with Stock Numbers

The Contractor’s shall submit a certificate of compliance for all electrical material and equipment with warranties, guarantees and instruction sheets. The Contractor shall guarantee electrical and mechanical equipment by him/her under his/her contract and will fully meet all requirements as to quality of such equipment furnished by him/her. The Contractor shall make, at his own expense, any repairs or replacements made necessary by defects in such equipment furnished by him/her that becomes evident within twelve (12) months after filing the Notice of Completion of the work and to restore to full compliance with the requirements of these Specifications, any such equipment which during the twelve (12) month period is found to be deficient with respect to any provision of the plans and specifications. The Contractor shall make all such repairs and replacements promptly upon receipt of written orders from the Engineer. If the Contractor fails to make the repairs and replacements promptly, the City may do the work and the Contractor, and his surety shall be liable for the costs incurred. 778

Part 3 BD - 22

Whenever any equipment is to be guaranteed or maintained by a manufacturer, supplier, or subcontractor, said obligation shall be that of the Contractor.

All guarantees shall be in writing and delivered to the Engineer by the Contractor prior to final acceptance of the work.

As-Built Prints

The Contractor is required to submit to the Engineer "As-Built" prints prior to the city accepting the work. The prints shall indicate (in red) all deviations from the plans such as, but not limited to locations of poles, pull boxes, detectors and conduit runs, depths of conduits, number of conductors and other appurtenant work.

Removing and Replacing Improvements

Replace or reconstruct underlying material damaged by your activities. Replacement material must be of equal or better quality than the material replaced.

If a part of a square or slab of concrete sidewalk, curb, gutter, or driveway is broken or damaged, the entire square or slab must be removed and reconstructed.

Cut the outline of concrete sidewalk or driveway to be removed:

1. Using a power-driven saw

2. On a neat line

3. To a 0.17-foot minimum depth

Where a sidewalk is marked in 4 to 8 feet sections, removals shall leave no less than 3 feet to the nearest score line. Where sidewalk is marked 4 feet sections, the concrete shall be removed and reconstructed to the nearest score line. Any removals of the existing curb ramp shall be removed and reconstructed to the nearest score line.

Any damage to the existing curb ramps due to the potholing, removal of the existing poles and foundation, and installation of the new pole and foundation shall be reconstructed to meet the latest Standard Plans for Public Works Construction. All reconstructed curb ramps shall meet the latest ADA standards.

Standards, Steel Pedestals, and Posts

Standards, steel pedestals and posts shall conform to the provisions in Section 701-10 “Standards, Pedestals, and Mast Arms” of the SSPWC, Section 86-1.02J, "Standards, 779

Part 3 BD - 23
Steel Pedestals and Posts" of the State Standard Specifications and these special provisions.

In addition to identifying each pole shaft as detailed on ES-7M of the State Standard Plans, the Contractor shall also identify each mast arm for all signals and luminaries. The stamped metal identification tag shall be located on the mast arm near the pole plate and shall contain the same information required by the ES-7M. Pole tags shall include name of the manufacturer and shall be visible from the road surface.

Pull Boxes

In addition to Section 701-11.1 of SSPWC and installing no. 5 pull boxes equally spaced out and less than 200 feet apart, pull boxes shall conform to the provisions in Section 86-

1.02C, "Pull Boxes" of the State Standard Specifications and these Special Provisions.

The contractor shall investigate all traffic signal pull boxes within the limits of the project and determine which of those pull boxes are no longer in use and/or abandoned. All traffic signal pull box removals stated in the plans shall be investigated prior to removal and determined by the contractor if said pull box is no longer in use and shall be removed. The contractor shall be responsible for removing said pull boxes no longer in use. Full compensation for salvaging, investigating, and removal of equipment shall be considered as included in the lump sum price bid for the traffic signal installation and no additional compensation will be allowed, therefore.

This shall include all labor, material and equipment required to remove, haul away and properly dispose of existing traffic signal pull box, cover, its appurtenance, and native soil to provide clear area for any new improvements. Removed pull box shall be backfilled with material equal to or better in quality and to the same thicknesses as the surrounding materials. Where damage is caused by the Contractor’s operations, the Contractor shall, at the Contractor’s expense, repair and replace damaged facilities.

Pull boxes, pull box covers and pull box extensions shall be concrete. Grout shall be placed in the bottom of all pull boxes per the Caltrans Specification. All pull boxes shall be No. 5 unless shown otherwise on the plans.

Full compensation to furnish and install a pull box shall be at the Contract unit price for Each "Pull box" and shall include all labor, materials, equipment, tools, excavation, removals, adjustment to finished grade and incidentals necessary for constructing these items of work and no additional compensation will be allowed therefor.

Traffic signal pull box covers shall be marked "TRAFFIC SIGNAL", except electrical service pull box covers, which shall be marked "EDISON".

780

Part 3 BD - 24
Marking must be clearly defined, uniform in depth, and parallel to either the long or short sides of the cover. Marking letters must be between 1 to 3 inches high.

Before galvanizing steel or cast-iron cover, apply marking by one of the following methods:

1. Use cast iron strip at least 1/4 inch thick with letters raised a minimum of 1/16 inch.

Fasten strip to cover with 1/4-inch flathead stainless steel machine bolts and nuts. Peen bolts after tightening.

2. Use sheet steel strip at least 0.027 inches thick with letters raised a minimum of 1/16 inch. Fasten strip to cover by spot welding, tack welding, or brazing, with 1/4-inch stainless steel rivets or 1/4-inch roundhead stainless steel machine bolts and nuts. Peen bolts after tightening.

3. Bead weld the letters on cover such that the letters are raised a minimum of 3/32 inch

Conduit

In addition to Section 701-12 of SSPWC, conduit shall conform to the provisions in Section 86-1.02B, "Conduit and Accessories," including installation of conduit by jacking or drilling methods, of the State Standard Specifications and these Special Provisions [Add the following]:

Traffic signal conduits located beneath roadway shall be installed at a minimum depth of 42-inches below finished surface or 6-inches below the structural section, whichever is deeper, but no more than 66-inches. Traffic signal conduits located behind curb and gutter shall be installed at a minimum depth of 30-inches below top of curb.

All new intersections shall include separate conduits for Signal Interconnect Cable (SIC) and signal wiring (including DLC). Sharing of the DLC and CCTV wiring in the same conduits with SIC is allowed on intersection modifications where conduit fill is less than 40%.

All interconnect conduits shall contain a No. 10 green insulated solid copper trace wire. All other conduits shall contain a bare, No. 8 solid copper bonding wire, which shall be soldered and crimped in each pull and connected to the ground bar in the traffic signal cabinet.

All underground conduits shall be Schedule 80 PVC confirming to 700-3.5.4 of SSPWC, unless otherwise approved by the Engineer.

Conduit runs are shown in schematic form only. Actual installations shall be done in the most direct manner.

Directional Boring
Contractor shall complete any necessary conduit runs by use of directional boring, 781

Part 3 BD - 25
Contractor shall reference Caltrans Standard Specifications 20-2.07C(2)(b) for directional boring. Notify the Engineer at least 2 business days before starting bore activities.

The diameter of the boring tool for directional boring must be only as large as necessary to install the conduit.

Mineral Slurry or wetting solution may be used to lubricate the boring tool and to stabilize the soil surrounding the boring path. The mineral slurry or wetting solution must be water based.

The directional bore equipment must have direction control of the boring tool and must have an electronic boring tool location detection system. During operation, the directional bore equipment must be able to determine the location of the tool both horizontally and vertically.

When approved by the Engineer, conduit runs shown on the plans to be located behind curbs may be installed in the street within two (2) feet and parallel to the gutter line of the curb by narrow trenching per City and APWA standards and approval of the Engineer. All pull boxes shall be located behind the curb or at the locations shown on the plans.

When approved by the City Engineer, trenching may be used as an alternative for directional boring. All work to install the conduits shall be considered as included in the contract price bid for traffic signals at each intersection and no additional compensation will be allowed.

Section 86-1.02(B), “Conduit and Accessories”, of the Standard Specifications is amended to add: Rigid metallic conduit to be used as a drilling or jacking rod shall be fitted with a proper drill for the size hole required.

After conductors have been installed, the ends of conduits terminating in pull boxes, and in service and controller cabinets shall be sealed with an approved type of sealing compound.

Conduit placed under existing pavement shall be in a trench approximately two (2) inches wider than the outside diameter of the conduit to be installed. Trench width shall not exceed six (6) inches. The top of the installed conduit shall be a minimum of twenty-four (24) inches below finish grade with the roadway and eighteen (18) inches below finish grade elsewhere.

The conduit shall be placed in the bottom of the trench and the trench shall be backfilled with sand slurry cement, containing not less than 188 pounds of cement per cubic yard, to not less than 0.20-feet below the pavement surface for asphalt surfaced roadway. The top

0.20 feet of the asphalt surfaced roadway shall be backfilled with asphalt concrete produced from commercial quality paving asphalt and aggregates.

Insulated bonding bushings will be required on metal conduit. After conductors have been installed, the ends of conduits terminating in pull boxes and other controller cabinets shall 782

Part 3 BD - 26
be sealed with an approved type of sealing compound. Pull boxes shall be precast in reinforced concrete. Grout in the bottom of pull boxes will not be required. Existing pull boxes in good condition may be reused if not disturbed. Broken covers and those not conforming to the above of the requirements on the plans shall be replaced.

Existing pull boxes not reused or noted for future use, including those formerly for lighting ballasts, shall be removed and salvaged and the area of removal repaired in kind with the surrounding area. Existing pull boxes within the area of curb ramps must be relocated.

No pull boxes shall be located within 1 foot of a curb ramp.

Wires, Conductors, and Cables

Conductors and wiring shall conform to the provisions in Section 86-1.02F, "Conductors and Cables," and these special provisions. All wires, conductors, and cables shall follow section 701-13 of the SSPWC.

Solder conductors by hot iron, pouring, or dipping method, connectors, and terminal lugs for conductor sizes No. 8 and smaller. Do not perform open-flame soldering.

Conductors shall be spliced using "C" shaped compression connectors. Splices in low voltage circuits (600 Volts maximum) shall be insulated by Method B.

Aluminum conductors shall not be substituted for copper.

Bonding and Grounding

Bonding and grounding shall conform to the provisions in Section 701-13.3 of SSPWC, Section 86-1.02F(2)(c)(ii), "Bonding Jumpers and Equipment Grounding Conductors," of the State Standard Specifications and these special provisions.

Groundings jumpers shall be attached by a 3/16 inch or larger brass bolt in the standard or in the pedestal, and shall be run to the conduit, ground rod, or bonding wire in the adjacent pull box. Grounding jumpers shall be visible after cap has been poured on foundations.

Services

Services shall be as indicated on the drawings and shall conform to the provisions in Section 701-14 of the SSPWC and these Special Provisions.

Street Lighting Construction

Street lighting construction shall conform to the provisions in Section 701-16 of the SSPWC and these Special Provisions.
783

Part 3 BD - 27

Street Name Signs

All street name signs shall be double sided and shall follow Table 2B-1 (CA) California Regulatory Sign and Plaque Sizes. Location of sign on mast arm will follow State of California Department of Transportation Standard Plans 2018. Bottom of sign shall be seven feet (7’) minimum over sidewalk.

All signs facing shall be manufactured of Diamond Grade Fluorescent VIP Sheeting. All signs shall have a graffiti film coating.

The date of installation of a sign is to be embossed on the back of the sign and shall be considered as the start of the warranty period. “Property of Lynwood” should also be embossed on the back of the sign.

All signs shall be standard size and reflectorized color as specified in the California Manual on Uniform Traffic Control Devices (CA-MUTCD) latest edition, unless otherwise shown on the plans.

Sign panel facing shall be perpendicular to approaching traffic unless otherwise specified by the Engineer.

The sign panels shall include the new City seal on the left side of each panel. The City seal shall be approved by the City Engineer prior to ordering the sign panels.

All traffic signal poles shall have pertinent street name sign per the city’s standard and the Engineer approval.

Message: The visible message shall be displayed from both sides of the signs and be reflectorized. Signs shall have white legends, symbols, arrows, and ¾-inch border on green background. The legend shall be as shown on the Plans. Side margins and spacing may be compressed when necessary to stay within sign length.

All internally illuminated street name sign shall be double sided unless otherwise noted on the plans. Arrows used in street name sign shall be in the opposite direction for the reverse side of the sign.

The full-size sign layout shall be submitted to the Engineer for approval prior to fabrication.

It shall be the responsibility of the contractor to keep the Engineer informed of all operations requiring inspection or approval prior to proceeding with fabrication. Internally illuminated street name signs shall be of standard size.

All equipment and hardware necessary to install the internally illuminated street name sign on the traffic signal pole or mast arm shall be included in the lump sum price bid for the contract and no additional compensation will be allowed. 784

Part 3 BD - 28

Payment: Contractor shall include the cost of labor, material, equipment and shall be included in the lump sum price bid for the contract.

Signs on Mast Arm and Traffic Signal Poles

All signs shall follow Table 2B-1 (CA) California Regulatory Sign and Plaque Sizes.

Location of sign on mast arm will follow State of California Department of Transportation Standard Plans 2018. Bottom of sign shall be seven feet (7’) minimum over sidewalk.

All signs facing shall be manufactured of Diamond Grade Fluorescent VIP Sheeting. All signs shall have a graffiti film coating.

The date of installation of a sign is to be embossed on the back of the sign and shall be considered as the start of the warranty period. “Property of Lynwood” should also be embossed on the back of the sign.

All signs shall be standard size and reflectorized color as specified in the California Manual on Uniform Traffic Control Devices (CA-MUTCD) latest edition, unless otherwise shown on the plans.

Sign panel facing shall be perpendicular to approaching traffic unless otherwise specified by the Engineer.

Payment: Contractor shall include the cost of labor, material, equipment and shall be included in the lump sum price bid for the contract.

Anti-Graffiti Coating

The contractor shall apply anti-graffiti coating to all above ground signs and signal equipment. Application of the coating shall not cause interference with the operation of the equipment.

Payment: Contractor shall include the cost of labor, material, equipment and shall be included in the lump sum price bid for the contract.

701-17 Traffic Signal Construction

Traffic signal construction shall conform to the provisions in Section 701-17 of the SSPWC and these Special Provisions.

Controller Assemblies

The Contractor shall furnish and install new Type 332 cabinets and foundation complete per Caltrans Standard Plan ES-3C with new 2070E controller, each equipped with D4 785

Part 3 BD - 29
program, two (2) ped isolation modules, and twelve (12) switch packs. Contractor shall furnish and install Type 2010 conflict monitor, 270 7G GPS Module and Antenna, and Myers battery backup system complete in a separate cabinet with anti-graffiti coating mounted to the 332 cabinet. Each traffic signal controller cabinet shall be wired for 8 vehicular phases. The contractor shall install all necessary equipment and appurtenances to provide the intended operation shown in the signal phase diagram on the signal plans.

Cabinet flanges shall be on the inside. All traffic signal construction shall follow Section 701-17 of the SSPWC

Cabinets shall follow the state standard specifications of Section 86-1.02Q “Cabinets.”

A Detector Activation Panel with momentary contact pushbutton switches for 8 vehicle phases and 4 pedestrian phases shall be provided, mounted on the front door of the cabinet, and connected to the wiring harness of the cabinet.

The contractor shall arrange to have a signal technician present at all times as the signal controller is turned on or changed over. The technician shall be fully qualified to work on the controller assembly and shall be employed by the controller manufacturer or his authorized representative.

Solid-State Switching Devices

Solid-state switching devices shall be Traffic Sensor Corporation Model 300-OICL or Agency-approved equal.

Signal Faces and Signal Heads

Signal faces, signal heads and auxiliary equipment, as shown on the plans, and the installation thereof, shall conform to the provisions in Sections 86-1.02R(4), "Signal Faces," 86-1.02R(4)(d), "Visors and Directional Louvers," 86-1.02(3), "Backplates," and 86-1.02(R)(2), "Signal Mounting Assemblies," of the State Standard Specifications and these Special Provisions.

For Overlap Traffic Signal Head, Programmable Visibility shall be used for green and red indications to limit signal visibility as intended. The overlap PV Cut-Off shown on the plans.

All vehicle and pedestrian signals shall be LED. All LEDs for traffic signal units shall be furnished by the Contractor. Lenses for vehicle heads shall be 12”. Vehicle heads shall come complete with housing, backplates, mounting, and sun visor. Signal section housings, backplates, and visors shall be of the metal type. The backplates shall be equipped with yellow Retroreflective Borders.

786

Part 3 BD - 30
Emergency Vehicle Pre-emption System

The following is hereby added to this subsection of Standard Specifications as the City decided to use Emergency Vehicle Preemption (EVP).

Emergency Vehicle Preemption (EVP) shall include encoded phase selectors, optical detectors, optical detector cable, card racks, antennas, clamps, panels, and any wiring harnesses required to interface the phase selectors to the traffic signal cabinet to actuate the controller and monitor phase green status. EVP systems shall be GTT Opticom TM Priority Control System.

The encoded phase selector shall be a Global Traffic Technologies (GTT) model 764 with a model 768 auxiliary interface panel wired for green inputs. ATMS P-44 cabinet installations shall include factory produced category 5e network cable to interface the 764- phase selector to the communications network switch.

The optical detectors shall consist of the following models:

1. GTT 722 Opticom TM Detector: Receives Optical signals from two directions and outputs two discrete electrical signals.

2. GTT 721 Opticom TM Detector: Receives Optical signals from two directions and outputs a single electrical signal.

3. GTT 711 Opticom TM Detector: Receives Optical signal from a single direction and outputs a single electrical signal.

When installing an EVP system in a Type P cabinet, the Contractor shall furnish and install a GTT model 760 card rack and all necessary electronics, wiring and devices required to interface with the traffic signal controller and the detector units in the controller cabinet in order to provide the intended operation. The Contractor shall also install an additional shelf in the Type P cabinet to accommodate the GTT model 760 card rack, where the existing detection shelf does not have enough space.

The circuits from the optical detectors to the phase selectors shall use GTT model 138 optical detector cables. These circuits shall carry power to the optical detector from the phase selector and carry the optical detector signal to the phase selector.

Pedestrian Signals

Pedestrian push button housings shall be die-cast or permanent mold cast aluminum.

Pedestrian push button signs shall be porcelain enameled metal. Pedestrian signals shall be LED and follow section 701-17.7 of the SSPWC.

Pedestrian signals shall conform to the provisions in Section 86-1.02S, "Pedestrian Signal Heads," of the State Standard Specifications and these Special Provisions [Add the following]:

787

Part 3 BD - 31
Pedestrian push buttons and international symbol sign plates shall be manufactured by Campbell Company Pedestrian Safety or approved equal. Pedestrian push button shall be the Campbell Company Pedestrian Safety’s “Guardian APS” model or approved equal.

The signalized intersection shall have ADA compliant pedestrian and bicycle push buttons as specified below:
a. PPB: New pedestrian push buttons (PPB) shall be ADA compliant Accessible Pedestrian Signals (APS) with international symbol sign plates.

The sign plates shall be per California MUTCD sign specifications. b. BPB: New or modified bicycle push buttons (BPB) shall be ADA compliant, nonvibratory, Type B, with international symbol sign plates. The sign plates shall be with directional arrow and per California MUTCD sign specifications.
c. Special: When applicable, provide special height push buttons for equestrian trail street crossings.
d. ADA requirements: The pedestrian push button assembly shall be mounted such that the center of the PPB cap is located per ADA regulations or one meter (40") from the ground. Bicycle push buttons, and any other non-vibratory buttons, shall have a 2-inch diameter, stainless steel, ADA compliant push button caps.
e. Accessible Pedestrian Signals (APS): APS push button systems shall be the field wired type, employing pedestrian head mounted interface boards.

Such units shall meet all California MUTCD standards including a vibro- tactile push button, with an integrated arrow indicating crosswalk direction, an audible locator tone, programmable audible walk and clearance messages (Section 4E.11), and adjustable volume control. The ambient noise level sensor for volume control shall be co-located with the APS station, on the same pole. All programmable functions shall be accessible from ground level at the APS station.

All furnishing and installation of pedestrian signals and push buttons shall be considered as included in the contract price bid for traffic signals at each intersection and no additional compensation will be allowed.

Paint and Galvanizing

All castings and steel pipe shall be factory powder coated to a color to be specified by the Engineer and follow section 701-19 of the SSPWC.

Salvaging Electrical Equipment

Salvaging electrical equipment shall conform to the provisions in Section 701-20 of the SSPWC.

Equipment shall be salvaged as indicated on the plans. Salvaged equipment shall be the responsibility of the Contractor. The Contractor may be instructed by the City to deliver all 788

Part 3 BD - 32
salvaged traffic signal equipment from this project to the City's Public Works facilities.

Unused underground conduit may be abandoned in place after all conductors have been removed except that conduit terminations from the conduit to be abandoned must be removed from the pull boxes to remain.

If removed electrical equipment is to be reinstalled, the contractor must supply all necessary materials and equipment, including signal mounting assemblies, anchor bolts, nuts, washers, and concrete as required to complete the new installation.

Exercise care in salvaging equipment so it will not be damaged or destroyed. Mast arms must be removed from the standards. Luminaires, signal heads, and signal mounting assemblies must be removed from the standards and mast arms. Holes resulting from removing pull boxes must be filled with material equivalent to the surrounding material.

Luminaires to be reinstalled must be cleaned and re-lamped.

Full compensation for salvaging and delivery of equipment shall be considered as included in the lump sum price bid for traffic signal installation and no additional compensation will be allowed, therefore.

Service Equipment Enclosure

Service equipment enclosure shall conform to the provisions in Section 86-1.02P(2), "Service Equipment Enclosure" of the State Standard Specifications and these Special Provisions [Add the following]:

Contractor shall reconfigure any irrigation and landscaping system affected by the installation of the new conduit wiring.

It is the responsibility of the contractor to notify Southern California Edison for the point of connection of the existing service equipment enclosure. All costs associated with the existing service equipment enclosure, and any reconfiguration of irrigation and landscape system affected by the installation of new conduit wiring shall be included in the lump sum price bid for traffic signal installation and no additional compensation will be allowed, therefore.

Potholing for Utility Lines and Foundations

Foundation Holes

A one-sack slurry mix shall be used to backfill foundation holes created because of removing the existing foundations. If the area excavated for a new foundation is deemed to have unstable soil as determined by the Engineer, then the area excavated shall be backfilled with one sack slurry mix, 24 hrs. prior to re-excavation for the new foundation.

Where the new foundation is within three (3) feet of the existing foundation, the removal and backfill of the existing foundation shall occur prior to the installation of the new foundation.
789

Part 3 BD - 33

Contractor shall pothole at all locations of new poles for conflict with utilities before ordering poles and payment for any necessary potholing for utility lines and foundation shall be included in this bid item for all labor materials, tools, equipment, and for doing all work involved, including traffic control and no additional compensation will be allowed.

TRAFFIC SIGNAL FIELD TESTS

Field Tests shall conform for the provisions in Section 86-1.01D(3), "Department Acceptance," of the State Standard Specifications and these special provisions.

In lieu of state testing, the testing of traffic signal equipment, including controller units, fully wired cabinets and auxiliary equipment as specified in Section 86-1.02Q, “Cabinets” of the State Standard Specifications will be performed by the City. Approximately 21 days will be required for testing and notification of the final results. The City shall be responsible for the cost of the first test. The Contractor shall be responsible for the costs of re-testing if the first test fails. The Contractor shall be responsible for the cost of transportation of equipment to and from the designated laboratory.

The Engineer shall be informed not less than 24 hours prior to the intended turn-on and beginning of the functional test. The ten-day functional test shall not start on a Friday, Saturday, Sunday, holiday, or any day preceding a holiday.

The Contractor shall arrange to have a signal technician, qualified to work on the controller and employed by the controller manufacturer or his representative present at the time the equipment is turned on, during the first day of the functional test and upon completion of the field installation.

Prior to turn-on, all equipment as shown on the plans shall be installed and operable. All louvers, hoods, and signal heads shall be directed to provide proper visibility. All signs, striping, and pavement markings as required on the plans shall be in place prior to tum on.

Turn-on shall take place only during the hours between 9:00 AM. and 2:00 PM on weekdays.

SHOP DRAWINGS

No more than 60 days after the Contract award and prior to approval of any of the components listed herein, the Contractor shall submit with the Materials and Equipment List three copies of shop drawings to the Engineer for review and approve. Shop drawings shall meet the requirements of the California Department of Transportation Standard Specifications (Caltrans) and these Technical Special Provisions. City Engineer/City Traffic Engineer needs to review mock up copy before order is placed by contractor.

Payment for Traffic Signal System Installation

Payment for Traffic Signal Installation for the Intersection of Imperial Highway and Ruth Avenue/Stockwell Drive Intersection shall be at the contract unit price per Lump 790

Part 3 BD - 34
Sum (LS) Price for the system installed complete and fully operational, and shall be considered full compensation for furnishing labor, materials, equipment, coordination, permits, and incidentals, and for doing all of the work involved in furnishing, installing, conduits, wiring, pull boxes, signs, traffic signal poles, signal heads, push bottoms, luminaires, restoration, and operationally complete in place, as shown on plans, and as specified in these special provisions.

It is the Contractor's responsibility to verify all existing facilities and shall notify the Engineer of any conflicts found during the pre-construction inspection, prior to commencement of any work. Payment for this work shall be included in the lump sum price bid and no additional compensation will be allowed therefor.

Bid Item No. 18 – Furnish and Install Traffic Signal Loop Detectors All equipment, materials, and components for traffic detector loops and the installation thereof, shall conform to the latest edition of the Caltrans Standard Plans and Standard Specifications, Section 86, ‘Signals and Lighting”, latest edition, except as noted in the Special Provisions and on the plans. These plans and specifications are hereinafter referred to as State Standard Plans and State Standard Specifications. Copies of these documents are available from Caltrans, District 7 office at 100 S. Main Street, Los Angeles, CA 90012 or the State Offices of Caltrans at 1900 Royal Oaks Drive, Sacramento, CA 95815 (916) 455-3520.

Traffic Signal Loop Detectors shall be Type E (6’ diameter) or Type E (6’ length) per Caltrans Standard Plans ES-5A and ES-5B.

Residue resulting from slot cutting/cleaning operations shall not be permitted to flow across shoulders or lanes occupied by public traffic and shall be removed from the pavement surface.

Contractor shall obtain approval from the City Engineer for exact location of loop detector prior to final placement. Perform preliminary striping layout prior to loop detector layout.

The Contractor shall test the new detectors with a motor driven cycle, as defined in the California Vehicle Code, that is licensed for street use by the Department of Motor Vehicles. The unladed weight of the vehicle shall not exceed 220 pounds, and the engine displacement shall not exceed 100 cubic centimeters. Special features, components, or vehicles designed to activate the detector will not be permitted. The Contractor shall provide an operator who shall drive the motor driven cycle through the response or detection area of the detector at not less than three (3) miles per hour or more than seven (7) miles per hour. The detector sensor unit shall provide the required output in response to this test.

Payment for Furnish and Install Traffic Signal Loop Detectors shall be at the contract unit price per Each (EA) Unit Price basis installed complete and operational and shall be considered full compensation for furnishing all labor, tools, equipment, materials, coordination, and incidentals, and for doing all the work involved in furnishing, installing, 791

Part 3 BD - 35
removals, salvaging, filling, traffic detector loops and appurtenances, providing temporary modifications to traffic signal system during construction as required, restoration work, operationally complete in place, as shown on plans, and as specified in the special provisions, and as directed by the City Engineer.

Bid Item No. 20 – Furnish and Install a Battery Back Up System (BBS) and Attached to New Cabinet Complete

The Myers battery back-up system (BBS) shall follow Section 86-1.02Q(5) of the state standard specifications and include, but not be limited to the following: inverter/charger, power transfer relay, batteries, a separate manually operated non-electronic bypass switch, and all necessary hardware and interconnect wiring, and side-mounted enclosure.

The BBS shall provide reliable emergency power to a traffic signal in the event of a power failure or interruption.

The BBS shall be capable of providing full power for full run-time operation for an "LED only" intersection (all colors red, yellow, and green) or flashing mode operation for an intersection using Red LEDs The system shall be capable of providing a minimum of 5 hours of full operation and two (2) hours in flash mode with 450 watts load.

The BBS shall be designed for outdoor applications, in accordance with the Caltrans Transportation Electrical Equipment Specifications (TEES), dated November 5, 2020, Chapter 4 requirements.

The location and position of the BBS and controller cabinet shall be approved by the City prior to sawcutting concrete.

Payment for Furnish and Install a Battery Back Up System (BBS) and Attach to New Cabinet Complete shall be at the Lump Sum (LS) contract price and shall be considered full compensation for sawcutting, digging, trenching, wiring, welding, forming, concrete work, furnishing all labor, materials, tools, equipment, and incidentals necessary to perform all work, involved in, as shown on the Construction Plans and no additional compensation will be allowed.

Bid Item No. 21 – Traffic Signing, Striping, Markings and Curb Painting

Traffic Signing, Striping, Markings, and curb painting as shown on Contract Drawings shall conform to the Caltrans Standard Specifications of the State of California (2022 edition), Department of Transportation, Sections No. 82 and 84 also as modified below.

All traffic striping and markings placed shall be of thermoplastic material.

Traffic stripes, pavement markings of arrows, symbols, numbers, hatching lines, and words shall conform to the California Department of Transportation Standard Specifications: Section 84-2 Thermoplastic Traffic Stripes and Pavement Markings, latest edition.
792

Part 3 BD - 36

For existing striping or markings shown to be replaced outside of new pavement area and on existing concrete surface, Contractor shall remove by wet sandblasting only all existing striping/legends/markings. Raised dots and markings shall be removed by grinding.

Prior to any project grinding and removal work, Contractor shall video all existing markings, painting, and pavement devices for use in carrying out this Bid Item.

Raised pavement markers other than blue hydrant markers shall conform to the California Department of Transportation Standard Specifications Section 84, current edition, and shall be of type as called for on the plans.

The Contractor shall furnish the necessary control points for all striping and markings, and shall be responsible for the completeness and accuracy thereof to the satisfaction of the City of Lynwood.

Painted and raised pavement marker removal shall conform to Section 84 of the Caltrans Standard Specifications, current edition. All residue remaining as a part of the removal operations shall be removed from the site.

Layout shall be approved, in writing, by the Engineer prior to placing Thermoplastic, curb painting, and markings.

Markings, as used in these Specifications, include both lines and miscellaneous markings applied to the pavement surface, painting of red curb and the installation of raised pavement markers. Materials and installation for painted and raised pavement markers shall conform to Section 84 of Caltrans Standard Specifications, current edition.

The Contractor shall provide cat tracking for the centerline and lane lines the same day, following paving operations. Reflectorized “slurry tabs” may be used in lieu of painted cat tracking.

Place Raised Blue Reflective for Fire Hydrant (NOT A BID ITEM)

Two-Way Blue Reflective Fire Hydrant Raised Pavement Markers installation as shown on Contract Drawings are a part of this item and shall conform to the Standard Specification Sections 314-3 and 314-4 to 314-5 and shall be in accordance with the Caltrans Traffic Manual Section 84 “Markings” for each fire hydrant.

Payment for Traffic Signing, Striping, Markings, and Curb Painting shall be at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing all labor, materials (including adhesives, glass beads, and paint), tools, equipment and incidentals necessary to perform all work, involved in, or appurtenant to the installation of pavement striping, raised reflective pavement markers, painting curbs, blue markers, including removal and installation of traffic signs and posts as indicated, complete in place for the width specified, and pavement markings of arrows, symbols, 793

Part 3 BD - 37
numbers and words , as shown on the plans and as required by the Project Specifications and no additional compensation will be allowed.

Bid Item No. 22 – Furnish and Install New Post for New Sign

This Bid Item shall include all labor, material and equipment required to install new sign and post. New signs shall be installed using metal posts set at a minimum of 30-inch depth minimum 12-inch square PCC, except as specified otherwise, the metal post shall be “kick-punch.” The length of the metal post shall be sufficient to extend from the top of the sign to 30-inches below the top of the concrete footing and provide a 7-foot clearance between the finished grade and the bottom of the sign.

The depth of the concrete footings shall be sufficient to extend at least 6-inches below the bottom of the posts. ¼-inch expansion paper shall be placed between the sign foundation and sidewalk.

All signs facing shall be manufactured of Diamond Grade Fluorescent VIP Sheeting. All signs shall have an anti-graffiti film coating.

The date of installation of a sign is to be embossed on the back of the sign and shall be considered as the start of the warranty period. “Property of Lynwood” should also be embossed on the back of the sign.

No signs will be allowed on traffic signal poles, unless otherwise shown on the plans.

All signs placed within the public right-of-way shall be installed using the following guidelines:

No signs shall be placed on wood poles at any time.

Larger (wide) signs shall be mounted on top of a sign combination.

No sign shall have an outside edge closer than one foot (1’) to the back of the curb.

Bottom of sign shall be at seven feet (7’) minimum over sidewalk.

Sign panel facing shall be perpendicular to approaching traffic unless otherwise specified by the Engineer.

Sign post shall be 10 feet channel type.

Signs shall be mounted on posts in a good workmanship manner using metal hardware suitable for the type of installation made.

Installation materials shall be of stainless steel and theft proof.

Signs shall be kept at a minimum distance of fifteen feet (15’) from trees, power poles, etc. Signs shall be kept far away from trees so that tree growth will not obstruct the visibility of the traffic sign.
794

Part 3 BD - 38

Sign posts shall be installed eighteen inches (18’) behind the curb face. Sign posts installed within the sidewalk must maintain a minimum of four-feet (4’) horizontal clearance for pedestrians.

All signs shall be standard size and reflectorized color as specified in the California Manual on Uniform Traffic Control Devices (CA-MUTCD) latest edition, unless otherwise shown on the plans.

All new signs and posts shall be anti-graffiti coated.

Payment for Furnish and Install New Post for New Sign shall be at the contract unit price per Each (EA) and shall be considered full compensation for complying with the above requirements. Furnishing of labor, materials, equipment, removal, excavation, hauling, properly disposing, protection of facilities, backfill, grading, sub-grade compaction, restoration, and incidentals for doing all the work involved complete in place, and no additional compensation will be allowed.

Bid Item No. 23 – Install Public Improvement Project Signs

The Contractor shall supply, erect, and maintain public improvement project signs for the duration of construction according to the specifications set forth below. A scaled layout of the sign shall be submitted to the City Engineer for approval prior to fabrication. The sign is illustrated in Appendix “F”.

Size: 4 feet by 4 feet mounted on Post with a 7 feet clearance above ground level.

Materials: 3/4-inch (exterior type) plywood (C-C EXT-DFPA grade).

Support: 4-inch by 4-inch by 11 feet posts.

Mounting: Frame shall be constructed using 2 inches by 6 inches by 8 feet mounted on skids centered on each post and a 2 inches by 4 inches by 5 feet 6 inches 45-degree brace for each skid and a 2 inches by 6 inches cross-strut between the bottom of the posts all of bolted construction. Plywood panel shall be mounted using 3 inch by 5 inches carriage bolts at 16 inches (maximum) on center.

Paint: Panel Face: Three coats outdoor enamel (sprayed) Panel Rear and Frame:

Two coats outdoor enamel (sprayed).

Color: Stark white background and blue lettering.

Lettering: Silkscreen enamels, Helvetica medium.

Covering: 1/4 inch clear plastic.

795

Part 3 BD - 39
Location: The signs shall be placed at each end of the street that the work is being constructed on. If various locations of work are included, the signs will be moved by the Contractor per the AGENCY’s schedule.

Disposition: After the Notice of Completion is issued, the sign shall become the property of the AGENCY, and the Contractor shall deliver the sign to the Public Works Facility at no expense to the AGENCY.

Should, at the time, Contractor need to prepare the signs, Contractor is to check with City as to approved sign the Public Works Department may have in storage that can be used.

Should the City have such signs, they shall be used instead of making new signs. Should the City have signs at the Public Works Department that the Contractor can use, the Contractor will only be paid for signs the Contractor has made and are so furnished.

Payment for the Installation of Public Improvement Project Signs shall be at the contract unit price per Each (EA) and shall include full compensation for all labor and materials, tools, equipment, and for doing all work involved, including delivery of the sign to the Public Works Facility at the end of the project.

Bid Item No. 24 – Provide Construction Survey, Re-establish Survey Monuments and Centerline Ties
It shall be the responsibility of the Contractor to supply any and all construction surveying and staking required. All surveying shall be performed under the direct supervision of a California Licensed Land Surveyor or Civil Engineer duly licensed to perform land surveying.

Construction Survey and staking consist of furnishing transportation, labor, materials, and equipment to provide surveying and field engineering under the direction of a Land Surveyor or Professional Engineer licensed in the State of California to do surveying.

Furnish skilled labor, instrument platforms, ladders, and such other temporary structures, required lighting for making and maintaining points and lines in connection with the surveys required.

Construction staking shall conform to the Standard Specification Section 2-9. Work under this Section includes, but is not limited to, the following:

1. Establish and maintain horizontal and vertical control points from City Engineer- supplied benchmarks and baselines.

2. Establish temporary benchmarks.

3. Layout of all work.

4. Construction staking for earthwork, paving work, and median curb required on the project.

5. Control, staking, and grade checking for all earthworks.

796

Part 3 BD - 40

6. Maintain records on reproducible contract drawings (ASCII points file) of as- constructed locations of project components and features during the course of the project.

7. Unless the project shows a separate bid item for the survey monumentation in bid schedule, contractor shall establish/reestablish survey monuments as shown on the construction drawings and file Corner Record Survey with the County Surveyor and the City Engineer.

City Engineer reserves the right to check the accuracy of Contractor's survey measurements and calculations. Regardless of whether or not the City Engineer exercises this right, the requirements for Contractor accuracy and adequacy will not be waived.

Copies of all completion survey notes, and other data shall be furnished to the City Engineer prior to beginning work that requires their use.

Prior to completion of Project and when requested by City Engineer, Contractor shall submit a copy of site drawing and certificate signed by California Registered Land Surveyor or Professional Engineer as applicable, that elevations and locations of Work are in conformance with Contract Documents.

Contractor shall set permanent monuments and file “Record of Survey Map”. The contractor shall be responsible for maintaining a complete and accurate log of control and survey work as it progresses.

Contractor shall verify locations of survey control points prior to starting any work on the Project Site. Contractor shall establish and submit to City Engineer any temporary control points as necessary due to construction activity. The Contractor shall notify City Engineer of any discrepancies discovered and resolved prior to starting any work.

The Contractor shall lay out work from the City Engineer's established control points, baselines, ranges, and gauges and shall be responsible for all measurements in connection therewith. Furnish, at Contractor's expense, all stakes, templates, platforms, equipment, range markers, and labor as may be required in laying out any part of the Work from the points and lines established by the City Engineer. The Contractor will be held responsible for the execution of the Work to such lines and grades as may be established or indicated by the City Engineer. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the City Engineer until authorized to remove them. If such marks are destroyed by the Contractor or through negligence prior to their authorized removal, they may be replaced by the City Engineer at City Engineer's discretion. The expense of replacement will be deducted from any amounts due, or to become due, the Contractor.

Surveying shall conform to methods, procedures, and requirements of the CALTRANS Survey Manual. Contractor shall set finish grades at a maximum of 50-ft. intervals for dirt, 25-ft. intervals for rock and at all grade breaks. Contractor shall establish or reestablish baselines and field control points as necessary and provide all basic site engineering to assure accurate locations and elevations for construction. It will be contractor’s responsibility to verify location and elevation of existing structures and utilities as required 797

Part 3 BD - 41
for new work.

Control datum for survey may be indicated on Contract Drawings. Contractor shall locate and protect, or replace survey control and reference points, preserve permanent reference points during construction, and provide record of survey for replacement at record monument. The contractor shall report to City Engineer loss or destruction of any reference point or relocation required because of changes in grades or other reasons and replace dislocated survey control points based on original survey control. There will be no changes without prior written notice to City Engineer.

Payment for Provide Construction Survey, Re-establish Survey Monuments and Centerline Ties shall be considered as included in the prices paid for the Various Items of work involved as specified in Section 309 of the Standard Construction Specifications and therefore no additional compensation will be made. This item shall include full compensation for setting permanent monument and filing “Record of Survey Map,” preparing and providing survey control plan during the project, obtaining all approvals and permits, as required, from the City Engineer, including, but not limited to, public agencies and the City of Lynwood; and complying with the requirements specified in those licenses and permits, coordination, field office facility; and incidentals necessary to perform all related items of work.
798

Part 4 BD - 1

CITY OF LYNWOOD

PUBLIC WORKS DEPARTMENT

_________________________________

PART 4 - APPENDICES

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF

IMPERIAL HIGHWAY AND RUTH AVENUE
FY 2023-2024

Project Number: 4011.68.115

4.1 Appendix A – Department of Industrial Relations (DIR) Contractor Registration Number Form

4.2 Appendix B – Standard Plans for Public Works Construction (SPPWC Standards) and City of Lynwood Standards

4.3 Appendix C – Contract Change Order (CCO) Form

4.4 Appendix D – Substitution Request Form

4.5 Appendix E – Labor Code Sections 1771, 1775, 1776, 1777.5, 1813 and 1815

4.6 Appendix F – Project Sign

4.7 Appendix G – Engineering and/or Architectural Plans (Contract Drawings)

799

Part 4 BD - 2

APPENDIX “A”

Department of Industrial Relations (DIR)
Contractor Registration Number Form

800

Part 4 BD - 3

Department of Industrial Relations (DIR)
Contractor Registration Number

Beginning July 1, 2014, contractors must register with the Department of Industrial Relations (DIR) before bidding on public works contracts in California. For more information, please refer to this section of the Department of Industrial Relations Website:
http://www.dir.ca.gov/Public-Works/PublicWorks.html.

Per this requirement, provide the following information:

______________________________________________________________________ Contractor Name

Contractor Department of Industrial Relations Registration Number:

______________________________________________________________________ Expiration Date of Registration Number

*(THIS FORM MUST BE SUBMITTED WITH THE SEALED BID) *

801

Part 4 BD - 4

APPENDIX “B”

STANDARD PLANS

802

Part 4 BD - 5

LIST OF STANDARD PLANS

Plan No. Description

Standard Plans for Public Works Construction:

SPPWC 111-5 Curb Ramp
SPPWC 112-2 Curb and Sidewalk Joints
SPPWC 113-2 Sidewalk and Driveway Replacement
SPPWC 120-3 Curb and Gutter – Barrier
SPPWC 122-3 Cross and Longitudinal Gutters

CALTRANS:

A20A Pavement Markers and Traffic Lines – Typical Details A20D Pavement Markers and Traffic Lines Typical Details A24A Pavement Markings Arrows
A24D Pavement Markings – Words
A24G Pavement Markings – Yield Lines, Limit Lines
ES-5A, ES-5B Electrical Systems (Loop Detectors)

803

Part 4 BD - 6

APPENDIX “C”

CONTRACT CHANGE ORDER (CCO) FORM

804

Part 4 BD - 7

CONTRACT CHANGE ORDER (CCO) FORM

CITY OF LYNWOOD

DEPARTMENT OF PUBLIC WORKS

Date: ______________ CCO No. _______ PROJECT No. 4011.68.104

Project Title: TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY AND RUTH AVENUE, (FY 2023-2024)

Plan Reference: _________________________Item Reference: _______________________________

Contractor:
_________________________________________________________________________________

Show as separate numbered paragraphs: (1) Reason for Change; (2) Description of Change; (3) Location of change (Stations, etc.); (4) Change in Contract Cost; (5) Extension of Contract, if warranted; (6) New Contract Total Including All Change Orders.

805

Part 4 BD - 8
APPENDIX “D”

SUBSTITUTION REQUEST FORM

806

Part 4 BD - 9

SUBSTITUTION REQUEST FORM

TO:
_____________________________________________________________________________________________

PROJECT: TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY AND RUTH AVENUE, (FY 2023-2024)

PROJECT NO: 4011.68.115

OWNER: CITY OF LYNWOOD

SPECIFIED ITEM:
__________________ ____ _________ _____________________________________________________ Section Page Paragraph Description

The undersigned requests consideration of the following:

PROPOSED SUBSTITUTION: ______________________________________________________________

Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of the request. Applicable portions of the data are clearly identified.

The undersigned states that the following paragraphs, unless modified on attachments, are correct:

1. The proposed substitution does not affect dimensions shown on Drawings and will not require a change in any of the Contract Documents.

2. The undersigned will pay for changes to the design, including engineering design, detailing, and construction costs caused by the requested substitution which is estimated to be $______________________________________________.

3. The proposed substitution will have no adverse effect on other contractors, the construction schedule (specifically the date of substantial completion), or specified warranty requirements.

4. Maintenance and service parts will be locally available for the proposed substitution.

5. The incorporation or use of the substitute in connection with the work is not subject to payment of any license fee or royalty.

The undersigned further states that the function, appearance, and quality of the Proposed Substitution are equivalent or superior to the Specified Item.

Submitted by Contractor: Reviewed by Engineer:

SIGNATURE: ____________________________________ □ ACCEPTED

FIRM: __________________________________________ □ ACCEPTED AS NOTED

_______________________________________________ □ NOT ACCEPTED

DATE: _________________________________________ □ RECEIVED TOO LATE

TELEPHONE: ______________________________ BY: ___________________________________________

TITLE: ________________________________________

DATE: ________________________________________

ATTACHMENTS: ___________________________ REMARKS: ___________________________________

807

Part 4 BD - 10

APPENDIX “E”

Labor Code Sections 1771, 1775, 1776, 1777.5, 1813 and 1815

808

Part 4 BD - 11
Labor Code Section 1771
Requirement of prevailing local rate for work under contract

Except for public works projects of one thousand dollars ($1,000) or less, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works.

This section is applicable only to work performed under contract, and is not applicable to work carried out by a public agency with its own forces. This section is applicable to contracts let for maintenance work.

Labor Code Section 1775
Forfeiture for paying less than prevailing wage rates; Amount of penalty; Payments to workers; Liability of prime contractor; Notification of complaint

(a)

(1) The contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the director for the work or craft in which the worker is employed for any public work done under the contract by the contractor or, except as provided in subdivision (b), by any subcontractor under the contractor.

(2)

(A) The amount of the penalty shall be determined by the Labor Commissioner based on consideration of both of the following:

(i) Whether the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor.

(ii) Whether the contractor or subcontractor has a prior record of failing to meet its prevailing wage obligations.

(B)

(i) The penalty may not be less than ten dollars ($10) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, unless the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor.

(ii) The penalty may not be less than twenty dollars ($20) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the contractor or subcontractor has been assessed penalties within the previous three years for failing to meet its prevailing wage obligations on a separate contract, unless those penalties were subsequently withdrawn or overturned.

(iii) The penalty may not be less than thirty dollars ($30) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the Labor Commissioner determines that the violation was willful, as defined in subdivision (c) of Section 1777.1.

(C) When the amount due under this section is collected from the contractor or subcontractor, any outstanding wage claim under Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 against that contractor or subcontractor shall be satisfied before applying that amount to the penalty imposed on 809

Part 4 BD - 12
that contractor or subcontractor pursuant to this section.

(D) The determination of the Labor Commissioner as to the amount of the penalty shall be reviewable only for abuse of discretion.

(E) The difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the contractor or subcontractor, and the body awarding the contract shall cause to be inserted in the contract a stipulation that this section will be complied with.

(b) If a worker employed by a subcontractor on a public works project is not paid the general prevailing rate of per diem wages by the subcontractor, the prime contractor of the project is not liable for any penalties under subdivision (a) unless the prime contractor had knowledge of that failure of the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime contractor fails to comply with all of the following requirements:

(1) The contract executed between the contractor and the subcontractor for the performance of work on the public works project shall include a copy of the provisions of Sections 1771, 1775, 1776, 1777.5, 1813, and 1815.

(2) The contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees, by periodic review of the certified payroll records of the subcontractor.

(3) Upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages, the contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited to, retaining sufficient funds due the subcontractor for work performed on the public works project.

(4) Prior to making final payment to the subcontractor for work performed on the public works project, the contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to his or her employees on the public works project and any amounts due pursuant to Section 1813.

(c) The Division of Labor Standards Enforcement shall notify the contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages

Labor Code Section 1777.5
Employment of apprentices on public works

(a) Nothing in this chapter shall prevent the employment of properly registered apprentices upon public works.

(b) Every apprentice employed upon public works shall be paid the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered and shall be employed only at the work of the craft or trade to which he or she is registered.

(c) Only apprentices, as defined in Section 3077, who are in training under apprenticeship standards that have been approved by the Chief of the Division of Apprenticeship Standards and who are parties to written apprentice agreements under Chapter 4 (commencing with Section 3070) of Division 3 are eligible to be employed at the apprentice wage rate on public works. The employment and training of each apprentice shall be in accordance with either of the following:

(1) The apprenticeship standards and apprentice agreements under which he or she is training.

(2) The rules and regulations of the California Apprenticeship Council.

810

Part 4 BD - 13
(d) When the contractor to whom the contract is awarded by the state or any political subdivision, in performing any of the work under the contract, employs workers in any apprenticeable craft or trade, the contractor shall employ apprentices in at least the ratio set forth in this section and may apply to any apprenticeship program in the craft or trade that can provide apprentices to the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. However, the decision of the apprenticeship program to approve or deny a certificate shall be subject to review by the Administrator of Apprenticeship. The apprenticeship program or programs, upon approving the contractor, shall arrange for the dispatch of apprentices to the contractor. A contractor covered by an apprenticeship program's standards shall not be required to submit any additional application in order to include additional public works contracts under that program. "Apprenticeable craft or trade," as used in this section, means a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the California Apprenticeship Council. As used in this section, "contractor" includes any subcontractor under a contractor who performs any public works not excluded by subdivision (o).

(e) Prior to commencing work on a contract for public works, every contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public work. The information submitted shall include an estimate of journeyman hours to be performed under the contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. A copy of this information shall also be submitted to the awarding body if requested by the awarding body. Within 60 days after concluding work on the contract, each contractor and subcontractor shall submit to the awarding body, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the contract. The information under this subdivision shall be public. The apprenticeship programs shall retain this information for 12 months.

(f) The apprenticeship program that can supply apprentices to the area of the site of the public work shall ensure equal employment and affirmative action in apprenticeship for women and minorities.

(g) The ratio of work performed by apprentices to journeymen employed in a particular craft or trade on the public work may be no higher than the ratio stipulated in the apprenticeship standards under which the apprenticeship program operates where the contractor agrees to be bound by those standards, but, except as otherwise provided in this section, in no case shall the ratio be less than one hour of apprentice work for every five hours of journeyman work.

(h) This ratio of apprentice work to journeyman work shall apply during any day or portion of a day when any journeyman is employed at the jobsite and shall be computed on the basis of the hours worked during the day by journeymen so employed. Any work performed by a journeyman in excess of eight hours per day or 40 hours per week shall not be used to calculate the ratio. The contractor shall employ apprentices for the number of hours computed as above before the end of the contract or, in the case of a subcontractor, before the end of the subcontract. However, the contractor shall endeavor, to the greatest extent possible, to employ apprentices during the same time period that the journeymen in the same craft or trade are employed at the jobsite. Where an hourly apprenticeship ratio is not feasible for a particular craft or trade, the Chief of the Division of Apprenticeship Standards, upon application of an apprenticeship program, may order a minimum ratio of not less than one apprentice for each five journeymen in a craft or trade classification.

(i) A contractor covered by this section that has agreed to be covered by an apprenticeship program's standards upon the issuance of the approval certificate, or that has been previously approved for an apprenticeship program in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the applicable apprenticeship standards, but in no event less than the 1-to-5 ratio required by subdivision (g).

(j) Upon proper showing by a contractor that he or she employs apprentices in a particular craft or trade in the state on all of his or her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by journeymen, the Chief of the Division of Apprenticeship Standards may grant a certificate exempting the contractor from the 1-to-5 hourly ratio, as set forth in this section for that craft or trade.
811

Part 4 BD - 14

(k) An apprenticeship program has the discretion to grant to a participating contractor or contractor association a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting the contractor from the 1-to-5 ratio set forth in this section when it finds that any one of the following conditions is met:

(1) Unemployment for the previous three-month period in the area exceeds an average of 15 percent.

(2) The number of apprentices in training in the area exceeds a ratio of 1 to 5.

(3) There is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either on a statewide basis or on a local basis.

(4) Assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.

(l) When an exemption is granted pursuant to subdivision (k) to an organization that represents contractors in a specific trade from the 1-to-5 ratio on a local or statewide basis, the member contractors shall not be required to submit individual applications for approval to local joint apprenticeship committees, if they are already covered by the local apprenticeship standards.

(m)

(1) A contractor to whom a contract is awarded, who, in performing any of the work under the contract, employs journeymen or apprentices in any apprenticeable craft or trade shall contribute to the California Apprenticeship Council the same amount that the director determines is the prevailing amount of apprenticeship training contributions in the area of the public works site. A contractor may take as a credit for payments to the council any amounts paid by the contractor to an approved apprenticeship program that can supply apprentices to the site of the public works project. The contractor may add the amount of the contributions in computing his or her bid for the contract.

(2) At the conclusion of the 2002-03 fiscal year and each fiscal year thereafter, the California Apprenticeship Council shall distribute training contributions received by the council under this subdivision, less the expenses of the Division of Apprenticeship Standards for administering this subdivision, by making grants to approved apprenticeship programs for the purpose of training apprentices. The funds shall be distributed as follows:

(A) If there is an approved multiemployer apprenticeship program serving the same craft or trade and geographic area for which the training contributions were made to the council, a grant to that program shall be made.

(B) If there are two or more approved multiemployer apprenticeship programs serving the same craft or trade and geographic area for which the training contributions were made to the council, the grant shall be divided among those programs based on the number of apprentices registered in each program.

(C) All training contributions not distributed under subparagraphs (A) and (B) shall be used to defray the future expenses of the Division of Apprenticeship Standards.

(3) All training contributions received pursuant to this subdivision shall be deposited in the Apprenticeship Training Contribution Fund, which is hereby created in the State Treasury. Notwithstanding Section 13340 of the Government Code, all money in the Apprenticeship Training Contribution Fund is hereby continuously appropriated for the purpose of carrying out this subdivision and to pay the expenses of the Division of Apprenticeship Standards.

(n) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this 812

Part 4 BD - 15
section. The stipulations shall fix the responsibility of compliance with this section for all apprenticeable occupations with the prime contractor.

(o) This section does not apply to contracts of general contractors or to contracts of specialty contractors not bidding for work through a general or prime contractor when the contracts of general contractors or those specialty contractors involve less than thirty thousand dollars ($30,000).

(p) All decisions of an apprenticeship program under this section are subject to Section 3081.

Labor Code Section 1776

Payroll record of wages paid; Inspection; Forms; Effect of noncompliance; Penalties

(a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:

(1) The information contained in the payroll record is true and correct.

(2) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project.

(b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis:

(1) A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request.

(2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of Industrial Relations.

(3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal office of the contractor.

(c) The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division. The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision (a).

(d) A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request.

(e) Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual's name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made 813

Part 4 BD - 16
available for inspection by, or furnished to, a joint labor-management committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual's name and social security number. A joint labor management committee may maintain an action in a court of competent jurisdiction against an employer who fails to comply with Section 1774. The court may award restitution to an employee for unpaid wages and may award the joint labor management committee reasonable attorney's fees and costs incurred in maintaining the action. An action under this subdivision may not be based on the employer's misclassification of the craft of a worker on its certified payroll records. Nothing in this subdivision limits any other available remedies for a violation of this chapter.

(f) The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address.

(g) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision (a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty-five dollars ($25) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.

(h) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section.

(i) The director shall adopt rules consistent with the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code) and the Information Practices Act of 1977 (Title 1.8 (commencing with Section 1798) of Part 4 of Division 3 of the Civil Code) governing the release of these records, including the establishment of reasonable fees to be charged for reproducing copies of records required by this section.

Labor Code Section 1813
Penalty when workman required to work excess hours; Stipulation in contract; Cognizance and report of violations

The contractor or subcontractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty-five dollars ($25) for each worker employed in the execution of the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. In awarding any contract for public work, the awarding body shall cause to be inserted in the contract a stipulation to this effect. The awarding body shall take cognizance of all violations of this article committed in the course of the execution of the contract, and shall report them to the Division of Labor Standards Enforcement.

Labor Code Section 1815
Work performed in excess of specified hour limitations; Compensation

Notwithstanding the provisions of Sections 1810 to 1814, inclusive, of this code, and notwithstanding any stipulation inserted in any contract pursuant to the requirements of said sections, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than 11/2 times the basic rate of pay.

814

Part 4 BD - 17

APPENDIX “F”

Project Sign

815

Part 4 BD - 18

APPENDIX “G”

Engineering Plans (Contract Drawings)

Under Separate Cover

Project Title:

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF

IMPERIAL HIGHWAY AND RUTH AVENUE
FY 2023-2024

Project Number: 4011.68.115

816
1 RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD AWARD OF CONTRACT TO DBX, INC. FOR THE TRAFFIC SIGNAL

IMPROVEMENTS AT THE INTERSECTION OF IMPERIAL HIGHWAY AND RUTH AVENUE FY 2023-2024 PROJECT NO. 4011.68.115;

AUTHORIZING THE CITY MANAGER TO APPROVE AGREEMENT

AMENDMENTS RELATED TO THE PROJECT AND AUTHORIZING THE
MAYOR TO EXECUTE THE AGREEMENT.

WHEREAS, the City of Lynwood conducted a traffic signal analysis at the intersection of Imperial Highway and Ruth Avenue and found that the intersection has met warrants for a new traffic signal; and
WHEREAS, plans and specifications were prepared for the design and presented to the City Council which received approval on April 18, 2023; and WHEREAS, the work to be performed consists of furnishing all labor, material, equipment, services, and incidentals required for traffic signals placement including installation of conduits, pull boxes, signal heads, sensor units, signal controller, pedestrian countdown heads, intersection lighting, pedestrian push buttons, traffic signal poles, traffic striping, markings, signing, and traffic control; hauling and disposal; and construction of curb ramps.; and
WHEREAS, on May 8, 2023, the Notice Inviting Bids (NIB) was advertised on the City’s website (PlanetBids). The Bid opening took place on the PlanetBids Platform on Wednesday, May 31, 2023, at 10:00 am (PST), and six (6) bids were received.; and WHEREAS, an analysis of all bidders was conducted, including a review of their bid schedule, license, references, and required documents. DBX, Inc. was the apparent lowest responsible bidder with a low base bid of $623,363.00.; and WHEREAS, the City received proposals for Construction Management and Inspection services and determined the estimated CM/I will be provided by Transtech Engineers Inc. in the amount of $71,520.00.

WHEREAS, the estimated project cost is $883,000.; and
WHEREAS, the current FY23 project budget has a total of $1,001,350.00 in ARPA funds available; and
WHEREAS, no additional appropriation is needed.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY FIND, PROCLAIM, ORDER, AND RESOLVE AS FOLLOWS:
817
1 Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct and incorporates them herein as findings and as substantive part of this Resolution.

Section 2. The City Council of the City of Lynwood authorizes the Mayor to execute the agreement between the City of Lynwood and DBX, Inc in a form approved by the City Attorney in the amount of $623,363.00.

Section 3. The City Council of the City of Lynwood authorizes the City Manager under LMC 6-3.15(d) to exceed the specific dollar amounts or percentage limitations under LMC 6-3.15(a) and authorizes the City Manager to approve consultant, vendor agreements, modifications, change orders, or agreement amendments related to the Project up to the available Project Budget.

Section 5. Per the City’s amended Contracting and Purchasing Policy, the City Council of the City of Lynwood approves construction management and inspection services from on call engineering consultant Transtech Engineers Inc.in the amount of $71,520.

Section 6. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.

Section 7. This Resolution shall take effect immediately upon its adoption.

Section 8. The City Clerk shall certify as to the adoption of this Resolution and hereafter the same shall be in full force and effect City Council Resolution. (Signatures on Next Page)
818
3 PASSED, APPROVED and ADOPTED this 20th day of June 2023.

Oscar Flores
Mayor
ATTEST:

Maria Quinonez Ernie Hernandez
City Clerk City Manager
APPROVED AS TO FORM: APPROVED AS TO CONTENT:

Noel Tapia Julian Lee
City Attorney Director of Public Works
819
4 STATE OF CALIFORNIA )
)

COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a regular meeting held on the 20th day of June 2023, and passed by the following votes:

AYES:

NOES:

ABSTAIN:

ABSENT:

Maria Quinonez, City Clerk

STATE OF CALIFORNIA )
)

COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true, and correct copy of Resolution No. on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this 20th day of June 2023.

Maria Quinonez, City Clerk
820

1. CALL TO ORDER

2. CERTIFICATION OF AGENDA POSTING BY SECRETARY

3. ROLL CALL OF MEMBERS
This Agenda contains a brief general description of each item to be considered. Copies of the Staff reports or other written documentation relating to each item of business referred to on the Agenda are on file in the Office of the City Clerk and are available for public inspection. Any person who has a question concerning any of the agenda items may call the City Manager at (310) 603-0220, ext. 200.

Procedures for Addressing the Council

IN ORDER TO EXPEDITE CITY COUNCIL BUSINESS, WE ASK THAT ALL PERSONS WISHING TO

ADDRESS THE COUNCIL SUBMIT YOUR COMMENTS IN ADVANCE TO
[email protected] OR FILL OUT A FORM PROVIDED AT THE PODIUM, AND TO TURN IT IN TO THE CITY CLERK PRIOR TO THE START OF THE MEETING. FAILURE TO FILL OUT SUCH A

FORM WILL PROHIBIT YOU FROM ADDRESSING THE COUNCIL IN THE ABSENCE OF THE UNANIMOUS CONSENT OF THE COUNCIL.

AGENDA
City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency

TO BE HELD ON
June 20, 2023
COUNCIL CHAMBERS - 11350 BULLIS ROAD. LYNWOOD, CA 90262 OR WEB CONFERENCE VIA ZOOM - TO PARTICIPATE VIA ZOOM OR BY TELEPHONE: 1-669- 900-9128 OR 1-253-215-8782 MEETING ID: 835 2029 8238
Duly Posted 6/17/23 By MQ
6:00 PM

Oscar Flores, Mayor
Rita Soto, Mayor Pro Tem
Gabriela Camacho, Council Member
Juan Munoz-Guevara, Council Member
Jose Luis Solache, Council Member

PUBLIC ORAL COMMUNICATIONS

(Regarding Agenda Items Only)

City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 1

4. PUBLIC HEARING

4.1 ADOPTION OF THE FISCAL YEAR 2023-25 BIENNIAL CITYWIDE BUDGET

NON-AGENDA PUBLIC ORAL COMMUNICATIONS

THIS PORTION PROVIDES AN OPPORTUNITY FOR THE PUBLIC TO ADDRESS THE

LYNWOOD SUCCESSOR AGENCY ON ITEMS WITHIN THE JURISDICTION OF THE LYNWOOD SUCCESSOR AGENCY AND NOT LISTED ON THE AGENDA. IF AN ITEM IS

NOT ON THE AGENDA, THERE SHOULD BE NO SUBSTANTIAL DISCUSSION OF THE

ISSUE BY LYNWOOD SUCCESSOR AGENCY, BUT LYNWOOD SUCCESSOR AGENCY

MAY REFER THE MATTER TO STAFF OR SCHEDULE SUBSTANTIVE DISCUSSION FOR A FUTURE MEETING. (The Ralph M. Brown Act, Government Code Section 54954.2 (a).)

Comments:

The City’s budget is an important policy document. It serves as an annual financial plan, identifying the spending priorities for the organization. The budget is used to balance available resources with community needs, as determined by the City Council. It also serves as a tool for communicating the City’s financial strategies and for ensuring accountability. The draft budget is posted and available for review online.

Generally, the City’s biennial operating budget process is a plan for two specified fiscal years. The fiscal years for this budget begin on July 1, 2023 and ends on June 30, 2025.

For the upcoming fiscal years, staff is presenting the proposed two-year operating and capital budgets for FY 2023-24 and 2024-25 for Council’s consideration. At the conclusion of the first fiscal year of this biennial budget cycle, i.e., end of FY 2023-24, staff will update the revenue estimates and appropriation, and bring back the revised FY 2024-25 budget for Council’s consideration.

The FY 2023-24 and FY 2024-25 Proposed Budgets were developed in the context of the City gradually recovering from the impact of the Covid-19 pandemic, but still facing a lot of economic uncertainties due to the ongoing Russo-Ukrainian war, increasing trade conflict with China and supply chain disorder, as well as the continue inflationary pressures and the increasing recessionary risk.

On May 30, 2023, the City Council conducted a Budget Workshop to review and discuss the FY 2023-25 Proposed Biennial Citywide Budget. The focus at the Budget Workshop was on the General Fund. Staff has taken Council’s comments on the draft budget, made modifications, and incorporated them into the full FY 2023-25 Proposed Biennial Citywide Budget (City, Successor Agency, Lynwood Utility Authority, Appropriations Limit, and Master Fee Schedule), for formal adoption. (FIN)
Recommendation:

Staff recommends that the City Council and Successor Agency open a public hearing, receive a presentation on the Fiscal Year (FY) 2023-25 proposed biennial citywide budget, receive public comments, close the public hearing, and each adopt the respective attached resolutions entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD ADOPTING THE FISCAL YEAR 2023-25 BIENNIAL CITYWIDE BUDGET
City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 2

5. CONSENT CALENDAR

6. NEW/OLD BUSINESS

A RESOLUTION OF THE CITY COUNCIL AS SUCCESSOR AGENCY TO THE LYNWOOD REDEVELOPMENT AGENCY ADOPTING THE FISCAL YEAR 2023-25

SUCCESSOR AGENCY BUDGET

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD APPROVING THE PROPOSED FEE REVISIONS AND ADOPTING THE FISCAL YEAR 2023-25

MASTER FEE SCHEDULE

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD ESTABLISHING THE APPROPRIATION LIMIT FOR FISCAL YEAR 2023-24

PURSUANT TO ARTICLE XIIIB OF THE CALIFORNIA CONSTITUTION

ALL MATTERS LISTED UNDER THE CONSENT CALENDAR WILL BE ACTED UPON BY ONE MOTION AFFIRMING THE ACTION RECOMMENDED ON THE AGENDA. THERE

WILL BE NO SEPARATE DISCUSSION ON THESE ITEMS PRIOR TO VOTING UNLESS

MEMBERS OF THE COUNCIL OR STAFF REQUEST SPECIFIC ITEMS TO BE REMOVED FROM THE CONSENT CALENDAR FOR SEPARATE ACTION.

ADJOURNMENT

CITY OF LYNWOOD AS SUCCESSOR AGENCY TO THE LYNWOOD REDEVELOPMENT AGENCY MEETINGS WILL BE POSTED AS NEEDED. THE NEXT MEETING WILL BE HELD IN THE COUNCIL CHAMBERS OF CITY HALL ANNEX, 11350 BULLIS ROAD, CITY OF LYNWOOD, CALIFORNIA.

City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 3

AGENDA STAFF REPORT

DATE:

June 20, 2023
TO:

Honorable Mayor and Members of the City Council
APPROVED BY:

Ernie Hernandez, City Manager
PREPARED BY:

Harry Wong, Director of Finance & Administration
Delania G. Whitaker, Senior Management Analyst
SUBJECT:

ADOPTION OF THE FISCAL YEAR 2023-25 BIENNIAL CITYWIDE
BUDGET
Agenda Item # 4.1.

Recommendation:

Staff recommends that the City Council and Successor Agency open a public hearing, receive a presentation on the Fiscal Year (FY) 2023-25 proposed biennial citywide budget, receive public comments, close the public hearing, and each adopt the respective attached resolutions entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD ADOPTING THE FISCAL YEAR 2023-25 BIENNIAL CITYWIDE BUDGET

A RESOLUTION OF THE CITY COUNCIL AS SUCCESSOR AGENCY TO THE LYNWOOD REDEVELOPMENT AGENCY ADOPTING THE FISCAL YEAR 2023-25 SUCCESSOR

AGENCY BUDGET

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD APPROVING THE PROPOSED FEE REVISIONS AND ADOPTING THE FISCAL YEAR 2023-25 MASTER FEE

SCHEDULE

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD ESTABLISHING THE APPROPRIATION LIMIT FOR FISCAL YEAR 2023-24 PURSUANT TO ARTICLE XIIIB

OF THE CALIFORNIA CONSTITUTION
Background:

The City’s budget is an important policy document. It serves as an annual financial plan, identifying the spending priorities for the organization. The budget is used to balance available resources with community needs, as determined by the City Council. It also serves as a tool Lynwood Successor Agency City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 4 for communicating the City’s financial strategies and for ensuring accountability.

Generally, the City’s biennial operating budget process is a plan for two specified fiscal years.

The fiscal years for this budget begin on July 1, 2023 and ends on June 30, 2025. For the upcoming fiscal years, staff is presenting the proposed two-year operating and capital budgets for FY 2023-24 and 2024-25 for Council’s consideration. At the conclusion of the first fiscal year of this biennial budget cycle, i.e., end of FY 2023-24, staff will update the revenue estimates and appropriation, and bring back the revised FY 2024-25 budget for Council’s consideration.

The FY 2023-24 and FY 2024-25 Proposed Budgets were developed in the context of the City gradually recovering from the impact of the Covid-19 pandemic, but still facing a lot of economic uncertainties due to the ongoing Russo-Ukrainian war, increasing trade conflict with China and supply chain disorder, as well as the continue inflationary pressures and the increasing recessionary risk.

On May 30, 2023, the City Council conducted a Budget Workshop to review and discuss the FY 2023-25 Proposed Biennial Citywide Budget. The focus at the Budget Workshop was on the General Fund. Staff has taken Council’s comments on the draft budget, made modifications, and incorporated them into the full FY 2023-25 Proposed Biennial Citywide Budget (City, Successor Agency, Lynwood Utility Authority, Appropriations Limit, and Master Fee Schedule), for formal adoption.

Budget Development

Per the Lynwood Municipal Code, the City Manager is responsible for the development of a proposed budget for consideration by the City Council. The budget development process begins with a mid-year update of the current year budget and the General Fund revenue forecast, which establishes a general framework to develop budget guidelines for the upcoming fiscal year.

The primary goals in developing the operating budget have been to ensure public safety, improve the City’s deteriorating infrastructure, and maintain core services to residents and businesses while ensuring fiscal conservancy. The City’s budget was developed utilizing Zero- Based Budgeting (ZBB). ZBB is an approach to budgeting in which each budgeted year’s activities are evaluated in a self-contained fashion, with little or no weight given to the precedents of past years. ZBB is contrasted to incremental budgeting, in which the budget justification is focused on the difference between the current year and the proposed budget year.

In addition to using a ZBB approach to budgeting, the following fiscal policies have been developed by the City Manager to provide each department a consistent and strategic approach in preparing the City’s FY 2023-25 Proposed Biennial Citywide Budget.

• Minimize use “one-time money” for ongoing operations. • Budget decisions will be made as a whole in context, with no special requests considered in isolation.
• The perception of funding actions, as well as the fiscal impact, will be considered before expenditures are made.
• Make strategic use of volunteers, partnerships and collaborations, including with other Lynwood Successor Agency City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 5 public agencies, to meet community needs and/or provide services. • The Biennial Citywide Budget shall be prepared such that current revenues plus net operating transfers will be sufficient to support current expenditures. • Review options for consolidation of functions that reduce operational costs and improve efficiency.
• Expenditures from all operating funds shall not exceed the budgeted appropriations (as amended) for these funds.
• When capital projects are considered, all associated costs should be identified in order to properly assess future financial impacts.
• Any necessary reduction in permanent positions will be accomplished first through attrition and retirements, with layoffs used only as a last resort. • Each enterprise fund should reflect the true cost of operation, including direct and indirect costs of services provided by the General Fund. • The use of reserves does not provide a viable solution to the revenue/expenditure gap. • Once adopted, the biennial citywide budget should be amended only when urgency requires, and then by identifying specific funding sources for these new priorities.

These policies are intended to serve as guidelines for measuring financial performance, justifying programs and services and setting future budgetary goals.

Departmental budgets are submitted to the City Manager for review for the proposed fiscal year budget(s). A draft preliminary budget is prepared. Once the draft preliminary budget is prepared it is presented to the City Council to solicit input and obtain further direction before the budget is finalized for adoption.

Key Changes from May 30th Budget Workshop

Pursuant to Council direction at the May 30, 2023 Budget Workshop, the following key changes have been incorporated into the FY 2023-25 Proposed Biennial Citywide Budget:

• Personnel Changes - Addition of two (2) part-time Office Assistant II – City Manager’s Office; Addition of one (1) full-time Facility & Program Supervisor – Recreation & Community Services; Reclassify five (5) part-time Maintenance Worker into one (1) full-time and two (2) part-time Maintenance Worker – Public Works
• $500,000 from ARPA funds for Utility Assistance Program • $50,000 from ARPA funds for additional business license enforcement services • $448,000 from ARPA funds for MultiSensor Cameras
• $198,000 from ARPA funds for Citywide License Plate Readers Discussion and Analysis:

GENERAL FUND

The General Fund is the primary revenue source and operating fund for most of the services, such as public safety (Los Angeles County Sheriff & Fire), street and park maintenance, and community services, that the City provides to the community.

The FY 2023-24 and FY 2024-25 Proposed Budgets were developed in the context of the City gradually recovering from the impact of the Covid-19 pandemic, but still facing a lot of Lynwood Successor Agency City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 6 economic uncertainties due to the ongoing Russo-Ukrainian war, increasing trade conflict with China and supply chain disorder, as well as the continue inflationary pressures and the increasing recessionary risk. For FY 2023-24, the proposed revenue for property, sales, and use taxes is comprised of 64.77%, or $27.58 million of the total $42.59 million in resources provided to the General Fund. Utility user’s tax, licenses, permits, franchise fees, fines, interest, rent and other miscellaneous sources represent 30.35%, or $12.93 million, of revenues. Interfund transfers from other funds make up another 4.88%, or $2.08 million of the total.

For FY 2024-25, the proposed revenue for property, sales, and use taxes is comprised of

59.55%, or $28.24 million of the total $47.42 million in resources provided to the General Fund. Utility user’s tax, licenses, permits, franchise fees, fines, interest, rent and other miscellaneous sources represent 28.66%, or $13.59 million, of revenues. Interfund transfers from other funds make up another 11.79%, or $5.59 million of the total.

FY 2023-25 GENERAL FUND

PROPOSED BUDGET

FY 2023-24
Proposed
FY 2024-25
Proposed

Revenue
$42,588,951
$47,420,576

Expenditures
$54,258,757
$48,044,643

Projected Deficit
($11,669,806)
($624,067)

Beginning Balance
$17,100,534
$5,430,728

Ending Balance
$5,430,728
$4,806,661

Fund Balance Needed to
Meet Reserve Policy
$5,425,876
$4,804,464

The FY 2023-24 proposed budget includes $54.26 million in recommended expenditures.

Personnel costs, which include salaries and benefits, represent $8.99 million of the total expenditures. Operational costs, which include materials, services and supplies, account for $33.32 million of the budget. Debt service and transfers to other funds costs total $11.95 million. The proposed expenditures have increased by 31.22% or $12.91 million over FY 2022-23 revised adopted budget. Such substantial increase is primarily due to the $11.95 million budgeted transfers out in FY23-24, of which $7.82 million are related to CIP projects, which are considered as non-recurring expenditures.

The FY 2024-25 proposed budget includes $48.04 million in recommended expenditures.

Personnel costs, which include salaries and benefits, represent $9.25 expenditures.

Operational costs, which include materials, services and supplies, account for $34.33 million of the budget. Debt service and transfers to other funds costs total $4.46 million. The projected expenditures have increased by 16.19% or $6.69 million over the FY 2022-23 revised adopted budget (of which $2.69 million increase is attributable to the increase in Lynwood Successor Agency City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 7 contract cost of police and fire safety services), but decreased 11.45% or $6.21 million from proposed FY 2023-24 budget.

Some of the key highlights of the 2023-25 proposed budget include:

Sustained level of service for Public Safety
Continuous operation of City Hall services with no reductions in hours Contingency Set-Aside Fund Transfer - $1,366,737 (Beginning FB is at negative $366,737)
Rainy Day Fund Transfer - $1,485,559 (10% of Measure PS) Establishment of Internal Service Funds
Self-Insurance Fund
Information Technology Fund
Equipment/Machinery/Vehicle Replacement Fund
Equipment/Machinery/Vehicle Maintenance Fund
Facilities Maintenance Fund (to be established in the next biennial budget) Resources for departments:

Additions
Communications Specialist – City Manager’s Office
Facility & Program Supervisor – Recreation & Community Services Assistant Administrative Analyst – Public Works
Maintenance Worker – Public Works
Two (2) part-time Office Assistant II – City Manager’s Office Ten (10) Part-Time Recreation Staff – Recreation & Community Services Two (2) Part-Time Maintenance Worker – Public Works
Deletions
Permit Technician – Public Works

3.60 FTE (Part-Time) Water/Sewer Service Workers – Public Works Reclassifications
ARPA Coordinator to Senior Management Analyst – City Manager’s Office PW Operations Supervisor to PW Operations Manager – Public Works Water Service/Wastewater Maintenance Worker II to Water Compliance Specialist – Public Works
Accounting Technician to Senior Accounting Technician – Public Works

CAPITAL IMPROVEMENT PROJECT (CIP) BUDGET

The combined CIP program for FY 2023-24 and FY 2024-25 is $55.13 million. For the fiscal years 2023–2024 and 2024–2025, non–general fund revenues will cover about 84.61% of the CIP, while general fund would cover the remaining 15.39%.

For FY 2023-24, water and sewer improvements total $16.09 million, street/alley/sidewalk/traffic improvements total $13.19 million, facilities/park improvements total $19.96 million, and other improvements total $550,000. For FY 2024-25, improvements to Water and Sewer facilities total $640,000 and street/alley/sidewalk/traffic improvements total $4.70 million.

PROPOSED WATER/SEWER RATE INCREASE
Lynwood Successor Agency City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 8

In efforts to maintain sufficient revenue to cover water/sewer operating expenses, the City has issued a prop 218 notice to increase the current rates that were last adjusted on April 18, 2017 for fiscal year 2017 through 2021. The establishment of the new rate structure allows the City achieve revenue stability, equitable cost recovery, and ratepayer affordability.

OTHER FUNDS – DEFICITS

For FY 2023-25, staff projects major operating deficits in the Landscape Maintenance Assessment District Fund and Equipment/Machinery/Vehicle Maintenance Fund. The operating deficit in the Landscape Maintenance Assessment District Fund for FY 2023-25 is due to the fact that proposed expenditures exceed revenues. The assessment rates have not been adjusted for more than 30 years. The rates have not kept up with current costs or CPI.

Therefore, operational expenses outpace tax assessment revenues.

The operating deficit in the Equipment/Machinery/Vehicle Maintenance Fund is due to higher equipment replacement and maintenance costs. City does not have a replacement fund for new equipment purchases/leases, and the existing maintenance fund does not have sufficient budget to cover the increasing equipment maintenance costs.

The FY 2023-25 proposed budgets include combined deficit of $10.46 million and $12.36 million for the Landscape Maintenance Assessment District Fund and Equip/Mach/Vehicle Maintenance Fund, respectively.

FY 2022-23
Projected
Fund Deficit
(Unaudited)
FY 2023-24
Proposed
Budget
FY 2024-25
Proposed
Budget
Landscape Maintenance
(6,537,742)
(8,389,247)
(10,290,014)
Equip/Mach/Vehicle
Maintenance Fund
(2,073,841)
(2,073,841)
(2,075,319)
Total
($8,611,583)
($10,463,088)
($12,365,333)
If no action is taken, the deficits (specifically the Landscape Maintenance Fund) will continue to increase. The General Fund cannot sustain these fund deficit amounts. The General Fund reserve will decline and ultimately become non-existent. The issue remains because the assessment rates for the Landscape Maintenance Fund have not been updated for years (last updated in FY 1998-99). Therefore, the Landscape Maintenance Fund will require action in the near future to address the ongoing funding source problems.

CONCLUSION

The final operating budget for FY 2023-25 reflects the ongoing efforts of staff to maintain service levels while achieving long-term fiscal stability. For many programs, comparisons between the proposed budget and prior-year budgets will show significant differences due to major modifications that have occurred across the organization in staffing levels, changes in delivery of service models, decreased reliance on consultants and thoughtful consideration to supply consumption.

Lynwood Successor Agency City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 9 FY 2023-25 Successor Agency Budget_230620.pdf
FY 2023-24 Master Fee Schedule Update_230620.pdf
FY 2023-24 Appropriation Limit_230620_FINAL.pdf
Resolution FY_2023-24__Appropriation_Limit.docx
Resolution FY_2023-25_Master_Fee_Schedule.docx
Resolution FY_2023-25_Budget_Adoption.docx
Resolution FY_2023-25_Successor_Agency.docx
Undoubtedly, much work lies ahead to achieve long-term fiscal sustainability. Over the course of the coming fiscal years, staff will continue to explore various methods for increasing revenue and providing services in the most cost-effective way possible, as well as examine different opportunities to address the City’s unfunded liabilities such as retiree medical, leave bank accruals, and retirement costs that continue to be major impediments to achieving fiscal sustainability.

Fiscal Impact:

It is estimated that the General Fund unassigned fund balance will complete the 2022-23 fiscal year, or to start the biennial budget of Fiscal Year 2023-25, at $17.10 million.

Unused appropriations and/or revenue exceeding expenses, at the end of every year, revert back to fund balance. Each fund’s fund balance can then be used for one-time expenses (non-operating) or put aside as a reserve for future purposes.

It is proposed by staff that
Council approve the transfer of those funds that exceeded expenses in 2022-23 to reserves, which are included in the year-end budget adjustments.

If Council elects to adopt the biennial budget of Fiscal Year 2023-25, the projected General Fund balance would be $5.30 million at the end of FY 2023-24 and $4.81 million at the end of FY 2024-25.

The draft proposed budget is available online for review by the City Council or the public.

Coordinated With:

City Manager
City Attorney
All Departments
ATTACHMENTS:

Description
Lynwood Successor Agency City of Lynwood as Successor Agency to the Lynwood Redevelopment Agency 10 FY 2022-23
Adopted
Budget
FY 2023-24
Proposed
Budget
FY 2024-25
Proposed
Budget
Revenues
Redevelopment Property Tax Trust
Fund (RPTTF) Revenues 5,198,938 $ 2,251,606 $ 2,251,606 $ Administrative Allowance - - - Total: 5,198,938$ 2,251,606 $ 2,251,606 $
Expenditures
Administrative Allowance - $ - $ - $ Project Staffing Costs 278,708 309,340 318,024 ROPS Obligations 5,225,699 2,524,193 2,117,414 Total: 5,504,407$ 2,833,532 $ 2,435,438 $
Surplus/(Deficit) (305,469) $ (581,926) $ (183,832) $ City of Lynwood
Exhibit C
FY 2023-25 Proposed Successor Agency Budget
11 FY 2023-25 Proposed Master Fee Schedule Changes Exhibit A # Category FY 23 Unit FY 24 Proposed Rate Unit Change Type 1 Planning Site Plan Review Planning Commission 840.00 $ each 2,749.00 $ each Updatin g fee schedule 2 Planning 2,396.00$ each 2,396.00 $ each Updatin g fee schedule 3 Planning Parcel/Track map Sub 2,749.00 $ each 3,749.00 $ each Increase 4 Planning SB9 Subdivision New Fee each $2,749.00 each Increase- Stae Bill 5 Planning Over the counter aproval residential 145.00 $ each 176.00 $ each Updating fee schedule 6 Business License Expedite Special Event Permit New Fee each 1500+Public Works Deposit each New Fee- Council 7 Water Reconnection Fee 40.00$ per occurrence 45.00 $ per occurance Updatin g fee schedule
8 Water Construction Meter Rental Fee 1.50 $ Dail y Fee 5.00 $ Dail y Fee 9 Water 3" Construction Meter 1,500.00 $ Refundable Deposit 1,500.00 $ Refundable Deposit Unit Chan ge 10 Water 6" Construction Meter 2,000.00$ Refundable Deposit New Fee 11 Water Construction Meter Installation 200.00$ each New Fee 12 Water Construction Meter Removal 200.00$ each New Fee 13 Water Construction Meter Relocation 100.00$ each New Fee 14 Water H ydrant Unauthorized Fee 750.00$ per incident New Fee 15 Water Construction Meter Staff Readin g 50.00$ per occurance New Fee Fee Name
Conditional Use Permit
12 REVENUE SUMMARY
FISCAL YEAR 2023-24

EXHIBIT B
Revenue Categories:

Taxes 50,480,493
Licenses/Permits 731,600
Revenue from Other Agencies 10,312,547
Charges for Services 18,408,777
Other Revenue 10,278,389
Fines, Forfeits & Penalties 897,000
Revenue from Money/Prop 1,171,710
Total Revenues 92,280,515
Taxes (Exclude Interest) 50,480,493
Non-taxes (Exclude Interest) 41,352,360
Total - Taxes and Non-Taxes 91,832,853
Add: Interest 447,662
Total - Taxes, Non-Taxes & Interest 92,280,515
Interest Distribution
(%):

Allocation for Taxes 54.97% 246,080
Allocation for Non-Taxes 45.03% 201,582
Total Interest 100.00% 447,662
Revenue Summary:

Taxes plus interest 50,726,573
Non-Taxes plus Interest 41,553,943
Total Revenues 92,280,515
13 APPROPRIATION LIMIT CALCULATION

POPULATION APPROPRIATION
YEAR CPI CHANGE % * FACTOR* LIMIT**
FY 1986-87 BASE YEAR 8,490,630
FY 2000-2001 (Recalculated) 17,267,822
FY 2001-2002 (Recalculated) 7.82% 1.09611 18,927,227
FY 2002-2003 (Recalculated) -1.27% 1.63% 1.00480 19,017,609 FY 2003-2004 (Recalculated) 2.31% 1.03% 1.04010 19,779,900 FY 2004-2005 (Recalculated) 3.28% 0.61% 1.04710 20,710,597 FY 2005-2006 (Recalculated) 5.26% 0.31% 1.06500 22,057,214 FY 2006-2007 (Recalculated) 3.96% 0.35% 1.04700 23,109,539 FY 2007-2008 (Recalculated) 4.42% 1.20% 1.05170 24,304,724 FY 2008-2009 (Recalculated) 4.29% 1.31% 1.05190 25,565,384 FY 2009-2010 (Recalculated) 4.35% 1.11% 1.01530 25,955,404 FY 2010-2011 (Recalculated) -2.54% 0.53% 0.98270 25,506,095 FY 2011-2012 (Recalculated) 2.51% 0.77% 1.02900 26,245,654 FY 2012-2013 3.77% 0.56% 1.04350 27,387,602
FY 2013-2014 5.12% 1.02% 1.06192 29,083,504
FY 2014-2015 -0.23% 0.42% 1.00548 29,242,942
FY 2015-2016 3.82% 0.52% 1.04671 30,608,975
FY 2016-2017 5.37% 0.20% 1.06266 32,526,825
FY 2017-2018 4.28% 0.57% 1.03690 33,919,309
FY 2018-2019 3.67% 0.78% 1.04479 35,438,428
FY 2019-2020 3.85% -0.01% 1.03840 36,799,127
FY 2020-2021 3.73% -0.11% 1.03616 38,129,746
FY 2021-2022 5.73% -0.89% 1.04789 39,955,781
FY 2022-2023 7.55% -0.71% 1.06786 42,667,338
2023-2024:
*Per Capita Cost of Living Change = 4.44 percent
*Population Change (Los Angeles County) = -0.75percent
Based on Population Change - County
Per Capita Cost of Living Converted to a Ratio: 4.44+100 = 1.04440
100
Population increase Converted to a Ratio: (-0.75)+100 = 0.99250 100
Calculation of Factor for FY 2022-2023: 1.04440 x 0.99250 = 1.03657 Calculation of Appropriation Limit $42,667,338 x 1.03657 = $44,227,555 (Prior Year's Appropriation Limit Multiplied by Factor)

STATUS OF APPROPRIATION LIMI
T FY 2023-2024
Maximum Appropriation Limit 44,227,555
(1) Proceeds of Taxes (less Retirement Taxes + Interest Allocation for Taxes) 45,032,573 Under Maximum Appropriation Limit -805,018
Over Maximum Appropriation Limit -
(1) (+) Proceeds of Taxes 50,480,493
(-) Retirement Taxes 5,694,000
(+) Interest Alloc. on Proceeds of Taxes 246,080
Total 45,032,573
*Source: State Department of Finance
14 May 2023
Dear Fiscal Officer:

Subject: Price Factor and Population Information
Appropriations Limit
California Revenue and Taxation Code section 2227 requires the Department of Finance (Finance) to transmit an estimate of the percentage change in population to local governments. Each local jurisdiction must use their percentage change in population factor for January 1, 20 23, in conjunction with a change in the cost of living, or price factor, to calculate their appropriations limit for fiscal year 2023-24. Attachment A provides the change in California’s per capita personal income and an example for utilizing the price factor and population percentage change factor to calculate the 2023-24 appropriations limit. Attachment B provides the city and unincorporated county population percentage change. Attachment C provides the population percentage change for counties and their summed incorporated areas. The population percentage change data excludes federal and state institutionalized populations and military populations.

Population Percent Change for Special Districts
Some special districts must establish an annual appropriations limit. California Revenue and Taxation Code section 2228 provides additional information regarding the appropriations limit.

Article XIII B, section 9(C) of the California Constitution exempts certain special districts from the appropriations limit calculation mandate. The code section and the California Constitution can be accessed at the following website: http://leginfo.legislature.ca.gov/faces/codes.xhtml.

Special districts required by law to calculate their appropriations limit must present the calculation as part of their annual audit. Any questions special districts have on this requirement should be directed to their county, district legal counsel, or the law itself. No state agency reviews the local appropriations limits.

Population Certification
The population certification program applies only to cities and counties. California Revenue and Taxation Code section 11005.6 mandates Finance to automatically certify any population estimate that exceeds the current certified population with the State Controller’s Office. Finance will certify the higher estimate to the State Controller by June 1, 2023.

Please Note: The prior year’s city population estimates may be revised. The per capita personal income change is based on historical data.

If you have any questions regarding this data, please contact the Demographic Research Unit at (916) 323-4086.

JOE SPEPHENSHAW
Director
By:

Erika Li
Chief Deputy Director
Attachment
15 May 2023
Attachment A
A. Price Factor: Article XIII B specifies that local jurisdictions select their cost of living factor to compute their appropriation limit by a vote of their governing body. The cost of living factor provided here is per capita personal income. If the percentage change in per capita personal income is selected, the percentage change to be used in setting the fiscal year 2023-24 appropriation limit is:

Per Capita Personal Income
Fiscal Year Percentage change
(FY) over prior year
2023-24 4.44
B. Following is an example using sample population change and the change in California per capita personal income as growth factors in computing a 2023-24 appropriation limit.
2023-24:

Per Capita Cost of Living Change = 4.44 percent
Population Change = -0.35 percent
Per Capita Cost of Living converted to a ratio: 4.44 + 100 = 1.0444 100
Population converted to a ratio: -0.35 + 100 = 0.9965
100
Calculation of factor for FY 2023-24: 1.0444 x 0.9965 = 1.0407 16 Fiscal Year 2023-24
Attachment B
Annual Percent Change in Population Minus Exclusions*
January 1, 2022 to January 1, 2023 and Total Population, January 1, 2023 Total
County Percent Change --- Population Minus Exclusions --- Population City 2022-2023 1-1-22 1-1-23 1-1-2023
Los Angeles
Agoura Hills -0.03 19,776 19,770 19,770
Alhambra -0.37 81,609 81,303 81,303
Arcadia -0.74 55,918 55,503 55,503
Artesia -0.82 16,139 16,007 16,093
Avalon -1.03 3,386 3,351 3,351
Azusa 0.06 49,453 49,483 49,483
Baldwin Park -0.63 70,815 70,368 70,368
Bell -0.72 33,612 33,370 33,370
Bellflower -0.92 77,638 76,924 76,924
Bell Gardens -0.84 38,774 38,447 38,447
Beverly Hills -0.90 31,945 31,658 31,658
Bradbury 0.34 886 889 889
Burbank -0.42 104,976 104,535 104,535
Calabasas -0.99 23,037 22,808 22,808
Carson -0.60 92,746 92,186 92,186
Cerritos -1.06 48,402 47,887 47,887
Claremont -0.74 37,034 36,759 36,759
Commerce -1.04 12,163 12,036 12,036
Compton -0.61 94,294 93,719 93,719
Covina -0.67 50,690 50,350 50,350
Cudahy -0.52 22,386 22,270 22,270
Culver City -0.73 39,972 39,682 39,682
Diamond Bar -1.03 53,935 53,381 53,381
Downey -0.73 112,078 111,261 111,261
Duarte 6.60 21,384 22,796 22,796
El Monte -0.84 107,279 106,377 106,377
El Segundo -0.67 17,042 16,928 16,928
Gardena -0.47 60,090 59,809 59,809
Glendale -0.82 192,870 191,284 191,284
Glendora -0.80 51,571 51,159 51,159
Hawaiian Gardens -0.94 13,675 13,546 13,546
Hawthorne -0.96 86,535 85,702 85,702
Hermosa Beach -0.98 19,206 19,018 19,018
Hidden Hills -0.80 1,745 1,731 1,731
Huntington Park -0.93 53,783 53,281 53,281
Industry -0.23 428 427 427
Inglewood -0.64 106,928 106,248 106,248
Irwindale -0.87 1,496 1,483 1,483
*Exclusions include residents on federal military installations and group quarters residents in state mental institutions, state and federal correctional institutions and veteran homes. 17 Fiscal Year 2023-24
Attachment B
Annual Percent Change in Population Minus Exclusions*
January 1, 2022 to January 1, 2023 and Total Population, January 1, 2023 Total
County Percent Change --- Population Minus Exclusions --- Population City 2022-2023 1-1-22 1-1-23 1-1-2023
La Canada Flintridge -0.65 20,060 19,930 19,930
La Habra Heights -1.06 5,564 5,505 5,505
Lakewood -0.92 80,900 80,154 80,154
La Mirada -1.00 48,384 47,899 47,899
Lancaster -0.54 170,660 169,742 173,376
La Puente -0.63 37,594 37,356 37,356
La Verne -0.89 32,344 32,056 32,056
Lawndale -0.93 31,171 30,882 30,882
Lomita -1.02 20,300 20,092 20,092
Long Beach -0.44 460,199 458,168 458,222
Los Angeles -0.97 3,800,240 3,763,328 3,766,109
Lynwood -0.55 66,595 66,228 66,228
Malibu -0.21 10,534 10,512 10,512
Manhattan Beach -1.24 34,713 34,284 34,284
Maywood -0.94 24,779 24,546 24,546
Monrovia -0.62 37,772 37,539 37,539
Montebello -0.26 61,804 61,645 61,645
Monterey Park -0.90 59,824 59,288 59,288
Norwalk -0.71 101,116 100,399 101,153
Palmdale -0.66 167,015 165,917 165,917
Palos Verdes Estates -0.90 13,052 12,935 12,935
Paramount -0.72 52,557 52,178 52,178
Pasadena -0.60 137,814 136,988 136,988
Pico Rivera -0.77 61,446 60,975 60,975
Pomona -0.12 149,908 149,721 149,721
Rancho Palos Verdes -1.02 41,434 41,013 41,030
Redondo Beach -0.97 69,078 68,407 68,407
Rolling Hills -1.13 1,688 1,669 1,669
Rolling Hills Estates -0.40 8,480 8,446 8,446
Rosemead -0.17 50,109 50,022 50,022
San Dimas -0.95 34,407 34,079 34,079
San Fernando -0.20 23,533 23,487 23,487
San Gabriel -0.58 38,690 38,466 38,466
San Marino -0.62 12,282 12,206 12,206
Santa Clarita 0.71 229,039 230,659 230,659
Santa Fe Springs -0.88 18,689 18,525 18,570
Santa Monica -0.02 91,739 91,720 91,720
Sierra Madre -0.81 10,909 10,821 10,821
Signal Hill -0.84 11,528 11,431 11,431
South El Monte -0.85 19,627 19,461 19,461
*Exclusions include residents on federal military installations and group quarters residents in state mental institutions, state and federal correctional institutions and veteran homes. 18 Fiscal Year 2023-24
Attachment B
Annual Percent Change in Population Minus Exclusions*
January 1, 2022 to January 1, 2023 and Total Population, January 1, 2023 County
City
Percent Change
2022-2023
--- Population Minus Exclusions ---
1-1-22 1-1-23
Total
Population
1-1-2023
South Gate
South Pasadena
Temple City
Torrance
Vernon
-0.78
-0.59
-0.55
-0.88
-0.97
93,355
26,428
36,010
144,327
207
92,628
26,273
35,813
143,057
205
92,628
26,273
35,813
143,057
205
Walnut
West Covina
West Hollywood
Westlake Village
Whittier
Unincorporated
-0.61

0.23 -0.39
-1.12
-0.47
-0.95
27,721
107,642
34,930
8,009
87,707
1,006,954
27,553
107,893
34,793
7,919
87,291
997,407
27,553
107,893
34,793
7,919
87,291
997,999
County Total -0.75 9,826,563 9,753,247 9,761,210
*Exclusions include residents on federal military installations and group quarters residents in state mental institutions, state and federal correctional institutions and veteran homes. 19 RESOLUTION NO._________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD ESTABLISHING THE APPROPRIATION LIMIT FOR FISCAL YEAR 2023-24

PURSUANT TO ARTICLE XIIIB OF THE CALIFORNIA CONSTITUTION WHEREAS, Article XIIIB of the California Constitution states that the total annual appropriation subject to limitations of each government entity shall not exceed the appropriation limit of such entity of government, except for prior year adjustments in the cost-of-living or personal income and population, as noted in Article XIIIB and State Statues; and
WHEREAS, pursuant to Article XIIIB of the California Constitution, and section 7900 et seq. of the California Government Code, the City of Lynwood is required to set its appropriation limit for each fiscal year by resolution, and approve appropriate inflation and population factors used in calculating the limit; and WHEREAS, the total annual appropriation subject to limitation has been computed in accordance with provisions set forth in Article XIIIB, Government Code Section 7900 et seq. and Proposition 111; and
WHEREAS, detailed documentation used in calculating the appropriation limit for FY 2023-24 is available for review on file in the Finance and Administration Department, and a summary is provided in the attached Exhibit “B”, which is incorporated as a part of this resolution for reference.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD
DOES HEREBY FIND, ORDER, AND RESOLVE AS FOLLOWS:

Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct, and incorporates them herein as findings and as a substantive part of this Resolution.

Section 2. That the City reserves the right to adjust or amend the appropriation limit based upon use of alternative growth factors as authorized by Proposition 111 if such changes or revisions would result in an advantageous appropriation limit, now or in the future.

Section 3. That the City of Lynwood’s Appropriation Limit for FY 2023-24 is $44,227,555 as calculated under Exhibit “B”.

Section 4. That the growth factors used in calculating the FY 2023-24 Appropriation Limit shall be the percentage change in California per capita income and the percentage change in population in the County of Los Angeles.

Section 5. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.
20 2
Section 6. The Resolution shall take effect immediately upon its adoption.

Section 7. The City Clerk shall certify as to the adoption of this City Council Resolution.

PASSED, APPROVED AND ADOPTED this 20th day of June, 2023. _________________________
Oscar Flores
Mayor
ATTEST:
______________________________ __________________________ Maria Quinonez Ernie Hernandez
City Clerk City Manager
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
___________________________ __________________________
Noel Tapia Harry Wong
City Attorney Director of Finance & Administration
21 3

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a meeting held on the ___th day of _______, 2023.

AYES:

NOES:

ABSENT:

ABSTAIN:

________________________
Maria Quiňonez,
City Clerk

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2023.XXX on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this ____th day of _________, 2023.
___________________________
Maria Quiňonez,
City Clerk
22 RESOLUTION NO._____________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD APPROVING THE PROPOSED FEE REVISIONS AND ADOPTING THE FISCAL YEAR 2023-25

MASTER FEE SCHEDULE
WHEREAS, the City of Lynwood is a general law city under California law with a recognized mandate to preserve, protect and enhance the general health and welfare of its residents; and
WHEREAS, the Government Finance Officers Association (GFOA) states: “A government should adopt policies that identify the manner in which fees and charges are set and the extent to which they cover the cost of the service provided”; and WHEREAS, the Master Fee Schedule allows the public and the City staff to obtain a better understanding of all fees, rates, and permits charged by the City of Lynwood; and WHEREAS, current charges are insufficient to cover all business costs associated with providing certain services; and
WHEREAS, pursuant to Government Code §66016, the specific fees to be charged for services must be adopted by the City Council by resolution or ordinance, after providing notice and holding a public hearing; and
WHEREAS, amendments for the Master Fee Schedule were presented to City Council on June 20, 2023.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY FIND, PROCLAIM, ORDER, AND RESOLVE AS FOLLOWS:

Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct, and incorporates them herein as findings and as a substantive part of this Resolution.

Section 2. That the City Council approves and adopts the revisions to the City of Lynwood’s Master Fee Schedule, attached hereto as Exhibit “A”, and the revisions together with the fees in the Master Fee Schedule that were already previously approved shall form the FY 2023-24 Master Fee Schedule which is hereby adopted.

Section 3. That any existing fee not specifically enumerated in the attached Exhibit “A” shall remain in effect at the current level and shall be subject to the provisions of the legislative action that placed it into effect.

Section 4. Any action adopting or increasing a fee or charge for development projects may not take effect for at least 60 days upon adoption. 23 2
Section 5. All other fees that are not related to development projects fees are effective immediately upon approval.

Section 6. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.

Section 7. This Resolution shall take full force and effect immediately upon adoption by the City Council.

Section 8. The City Clerk shall certify as to the adoption of this City Council Resolution.

PASSED, APPROVED AND ADOPTED this 20th day of June, 2023. ____________________________
Oscar Flores
Mayor
ATTEST:
______________________________ _____________________________ Maria Quinonez Ernie Hernandez
City Clerk City Manager
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
______________________________ ______________________________ Noel Tapia Harry Wong
City Attorney Director of Finance & Administration
24 3

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a meeting held on the ___th day of _______, 2023.

AYES:

NOES:

ABSENT:

ABSTAIN:

________________________
Maria Quiňonez,
City Clerk

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2023.XXX on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this ____th day of _________, 2023.
___________________________
Maria Quiňonez,
City Clerk
25 4
26 1
RESOLUTION NO._____________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD ADOPTING THE FISCAL YEAR 2023-25 BIENNIAL CITYWIDE BUDGET
WHEREAS, the City Council of the City of Lynwood (the “City Council”) reviewed the FY 2023-25 Proposed Budget for the City of Lynwood attached herein and made a part of this resolution through this reference; and
WHEREAS, the agenda for the June 20, 2023 meeting of the City Council was duly posted, and the FY 2023-25 Proposed Budget and all related agenda material were made available to the interested parties.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY RESOLVE AND DETERMINE AS FOLLOWS:

Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct, and incorporates them herein as findings and as a substantive part of this Resolution.

Section 2. The City of Lynwood Budget for Fiscal Year 2023-25 is hereby adopted, as presented in the FY 2023-25 Proposed Budget.

Section 3. The Fiscal Year 2023-25 Proposed Budget will be amended by adding, deleting, reclassifying, and/or transferring the classifications/positions and their funding as follows:
# of Action Position Title Department
1 Add Communications Specialist City Manager’s Office
2 Add Part-Time Office Assistant II City Manager’s Office 1 Add Assistant Administrative Analyst Public Works
1 Add Maintenance Worker Public Works
2 Add Part-Time Maintenance Worker Public Works
1 Add Facility & Program Supervisor
Recreation & Community
Services
10 Add Part-Time Recreation Staff
Recreation & Community
Services
1 Delete Permit Technician Public Works

3.60 FTE Delete
Part-Time Water/Sewer Service
Worker Public Works
1 Reclass
ARPA Coordinator to Senior
Management Analyst City Manager’s Office
1 Reclass
Public Works Operations
Supervisor to Public Works
Operations Manager Public Works
27 2
# of Action Position Title Department
1 Reclass
Water Service/Wastewater
Maintenance Worker II to Water
Compliance Specialist Public Works
1 Reclass
Accounting Technician to Senior
Accounting Technician Public Works
Section 4. That the City Manager (at his discretion) or his designee is authorized to carry over incomplete Capital Improvement Projects with remaining account balances and available funding sources from the prior fiscal year, to allow the work in progress relative to these projects to continue in an uninterrupted manner contingent upon revenues being available.

Section 5. The City Manager or his designee is authorized to approve any transfer between accounts provided that they are within the same department and the same fund.

Section 6. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.

Section 7. This Resolution shall go into effect immediately upon its adoption.

Section 8. The City Clerk shall certify as to the adoption of this City Council Resolution.

PASSED, APPROVED AND ADOPTED this 20th day of June, 2023. _____________________________
Oscar Flores
Mayor
ATTEST:
______________________________ _____________________________ Maria Quinonez Ernie Hernandez
City Clerk City Manager
28 3
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
___________________________ _____________________________ Noel Tapia Harry Wong
City Attorney Director of Finance & Administration
29 4

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a meeting held on the ___th day of _______, 2023.

AYES:

NOES:

ABSENT:

ABSTAIN:

________________________
Maria Quiňonez,
City Clerk

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2023.XXX on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this ____th day of _________, 2023.
___________________________
Maria Quiňonez,
City Clerk
30 RESOLUTION NO. ________

A RESOLUTION OF THE CITY COUNCIL AS SUCCESSOR AGENCY TO THE LYNWOOD REDEVELOPMENT AGENCY ADOPTING THE FISCAL YEAR 2023-25

SUCCESSOR AGENCY BUDGET
WHEREAS, the City Council as Successor Agency to the Lynwood Redevelopment Agency reviewed the Fiscal Year 2023-25 Proposed Budget for the Successor Agency attached as Exhibit “C”; and
WHEREAS, the agenda for the June 20, 2023 meeting of the City Council as Successor Agency to the Lynwood Redevelopment Agency was duly posted, and the Fiscal Year 2023-25 Proposed Budget for the Successor Agency and all related agenda material were made available to all interested parties.

NOW, THEREFORE, THE CITY COUNCIL AS SUCCESSOR AGENCY TO THE LYNWOOD REDEVELOPMENT AGENCY DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct, and incorporates them herein as findings and as a substantive part of this Resolution.

Section 2. The Successor Agency budget for Fiscal Year 2023-25 is hereby adopted, as presented in the FY 2023-25 Proposed Budget.

Section 3. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.

Section 4. This Resolution shall go into effect immediately upon its adoption.

Section 5. The City Clerk shall certify as to the adoption of this City Council Resolution.

PASSED, APPROVED and ADOPTED this 20th day of June, 2023. ___________________________
Oscar Flores
Mayor
31 2
ATTEST:
______________________________ ____________________________ Maria Quinonez Ernie Hernandez
City Clerk City Manager
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
___________________________ __________________________
Noel Tapia Harry Wong
City Attorney Director of Finance & Administration
32 3

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a meeting held on the ___th day of _______, 2023.

AYES:

NOES:

ABSENT:

ABSTAIN:

________________________
Maria Quiňonez,
City Clerk

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2023.XXX on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this ____th day of _________, 2023.
___________________________
Maria Quiňonez,
City Clerk
33 1.

CALL TO ORDER

2. CERTIFICATION OF AGENDA POSTING BY SECRETARY

3. ROLL CALL OF MEMBERS
This Agenda contains a brief general description of each item to be considered. Copies of the Staff reports or other written documentation relating to each item of business referred to on the Agenda are on file in the Office of the City Clerk and are available for public inspection. Any person who has a question concerning any of the agenda items may call the City Manager at (310) 603-0220, ext. 200.

Procedures for Addressing the Council

IN ORDER TO EXPEDITE CITY COUNCIL BUSINESS, WE ASK THAT ALL PERSONS WISHING TO

ADDRESS THE COUNCIL SUBMIT YOUR COMMENTS IN ADVANCE TO
[email protected] OR FILL OUT A FORM PROVIDED AT THE PODIUM, AND TO TURN IT IN TO THE CITY CLERK PRIOR TO THE START OF THE MEETING. FAILURE TO FILL OUT SUCH A

FORM WILL PROHIBIT YOU FROM ADDRESSING THE COUNCIL IN THE ABSENCE OF THE UNANIMOUS CONSENT OF THE COUNCIL.

AGENDA
Lynwood Utility Authority

TO BE HELD ON
June 20, 2023
COUNCIL CHAMBERS - 11350 BULLIS ROAD. LYNWOOD, CA 90262 OR WEB CONFERENCE VIA ZOOM - TO PARTICIPATE VIA ZOOM OR BY TELEPHONE: 1-669- 900-9128 OR 1-253-215-8782 MEETING ID: 835 2029 8238
Duly Posted 6/17/23 By MQ
6:00 PM

Oscar Flores, President
Rita Soto, Vice President
Gabriela Camacho, Member
Juan Munoz-Guevara, Member
Jose Luis Solache, Member

PUBLIC ORAL COMMUNICATIONS

(Regarding Agenda Items Only)

Lynwood Utility Authority 1

4. PUBLIC HEARING

4.1 ADOPTION OF THE FY 2023-25 LYNWOOD UTILITY AUTHORITY BUDGET

5. CONSENT CALENDAR

6. NEW/OLD BUSINESS

NON-AGENDA PUBLIC ORAL COMMUNICATIONS

THIS PORTION PROVIDES AN OPPORTUNITY FOR THE PUBLIC TO ADDRESS

THE LYNWOOD UTILITY

AUTHORITY ON ITEMS WITHIN THE JURISDICTION OF THE LYNWOOD UTILITY

AUTHORITY AND NOT LISTED
ON THE AGENDA. IF AN ITEM IS NOT ON THE AGENDA, THERE SHOULD BE NO

SUBSTANTIAL DISCUSSION

OF THE ISSUE BY LYNWOOD UTILITY AUTHORITY, BUT LYNWOOD UTILITY

AUTHORITY MAY REFER THE

MATTER TO STAFF OR SCHEDULE SUBSTANTIVE DISCUSSION FOR A FUTURE MEETING. (The Ralph M.

Brown Act, Government Code Section 54954.2 (a).)

Comments:

On May 30, 2023, the City Council held a budget workshop to receive a presentation on the Fiscal Year 2023-25 Proposed Budget and provide input for staff’s consideration.

Staff recommends the Members of the Lynwood Utility Authority adopt the FY 2023-25 LUA Proposed Budgets. (FIN)
Recommendation:

Staff recommends that the Lynwood Utility Authority conduct a public hearing, receive a presentation on the proposed Fiscal Year 2023-25 Budget, accept public comments, close the public hearing, and adopt the attached resolution entitled “A RESOLUTION OF THE LYNWOOD UTILITY AUTHORITY ADOPTING THE FISCAL YEAR 2023-25 BUDGET FOR THE WATER ENTERPRISE FUND AND SEWER ENTERPRISE FUND.”

ALL MATTERS LISTED UNDER THE CONSENT CALENDAR WILL BE ACTED UPON BY ONE MOTION AFFIRMING THE ACTION RECOMMENDED ON THE AGENDA. THERE

WILL BE NO SEPARATE DISCUSSION ON THESE ITEMS PRIOR TO VOTING UNLESS

MEMBERS OF THE COUNCIL OR STAFF REQUEST SPECIFIC ITEMS TO BE REMOVED FROM THE CONSENT CALENDAR FOR SEPARATE ACTION.

ADJOURNMENT
THE LYNWOOD UTILITY AUTHORITY MEETINGS WILL BE POSTED AS NEEDED. THE

NEXT MEETING WILL BE HELD IN THE COUNCIL CHAMBERS OF THE CITY HALL ANNEX, 11350 BULLIS ROAD, CITY OF LYNWOOD, CALIFORNIA.

Lynwood Utility Authority 2

AGENDA STAFF REPORT

DATE:

June 20, 2023
TO:

Honorable President and Members of the Lynwood Utility Authority APPROVED BY:

Ernie Hernandez, City Manager
PREPARED BY:

Harry Wong, Director of Finance & Administration
Delania G. Whitaker, Senior Management Analyst
SUBJECT:

ADOPTION OF THE FY 2023-25 LYNWOOD UTILITY AUTHORITY
BUDGET
Agenda Item # 4.1.

Recommendation:

Staff recommends that the Lynwood Utility Authority conduct a public hearing, receive a presentation on the proposed Fiscal Year 2023-25 Budget, accept public comments, close the public hearing, and adopt the attached resolution entitled “A RESOLUTION OF THE LYNWOOD UTILITY AUTHORITY ADOPTING THE FISCAL YEAR 2023-25 BUDGET FOR THE WATER ENTERPRISE FUND AND SEWER ENTERPRISE FUND.”
Background:

On May 30, 2023, the City Council held a budget workshop to receive a presentation on the Fiscal Year 2023-25 Proposed Budget and provide input for staff’s consideration. Staff recommends the Members of the Lynwood Utility Authority adopt the FY 2023-25 LUA Proposed Budgets.

Discussion and Analysis:

The tables below include the FY 2022-23 Revised Adopted Budget, FY 2022-23 Projected Year-End (Unaudited) and FY 2023-24 and FY 2024-25 Proposed Budget for the Water and Lynwood Utility Authority Lynwood Utility Authority 3
Sewer Fund.

Water Fund

This Enterprise Fund is used to account for operations that are financed and operated in a manner similar to a private business enterprise - where the intent of the City Council is that the costs (expenses, including depreciation) of providing goods or services to the general public on a continuing basis be financed or recovered primarily through user charges.

The FY 2022-23 Projected Year-End (Unaudited) is $9.57 million in total revenues and $12.81 million in expenditures. The FY 2022-23 Projected Year-End (Unaudited) expenditures include $950,000 transfers-out. The unspent portion of the transfers-out for capital and improvement projects is included in the FY 2023-24 Proposed Budget.

The total FY 2023-24 Proposed Budget for the Water Fund is $14.72 million supported by $11.65 million in revenues. This budget includes $750,000 transfer-out to the General Fund and $1.30 million transfer-out to the Capital Improvement Projects (CIP) fund to support various capital improvement projects. Current bonding will provide the funding.

The total FY 2024-25 Proposed Budget for the Water Fund is $13.74 million supported by $11.65 million in revenues. This budget includes $750,000 transfer-out to the General Fund and $100,000 to the CIP fund to support various capital improvement projects. Current bonding will provide the funding.

TABLE 1
FY 2023-25 PROPOSED BUDGET
WATER FUND (Fund 6051)

FY 2022-23
Revised
Adopted
Budget
FY 2022-23
Projected Year-
End
(Unaudited)
FY 2023-24
Proposed
Budget
FY 2024-25
Proposed
Budget
Revenues

Water Fund
$12,108,799
$9,568,790
$11,648,026
$11,648,026
Transfers In
0 0
0 0
Total Revenues
$12,108,799
$9,568,790
$11,648,026
$11,648,026

Expenditures

Water Fund
$12,876,817
$11,856,636
$12,666,494
$12,889,903
Lynwood Utility Authority Lynwood Utility Authority 4
Transfers Out
1,596,421
950,000
2,050,000
850,000
Total Expenditures
$14,473,238
$12,806,636
$14,716,494
$13,739,903

Surplus/(Deficit)
($2,364,439)
($3,237,846)
($3,068,468)
($2,091,877)

Sewer Fund

The FY 2022-23 Projected Year-End (Unaudited) is $2.94 million in revenue and $2.14 million in expenditures, which results in a surplus of $539,000. The total FY 2023-24 Proposed Budget for the Sewer Fund is $3.96 million supported by $2.90 million in revenue. This budget includes $250,000 transfer out to the General Fund and $762,000 transfer out to the CIP Fund for capital improvement projects.

The total FY 2024-25 Proposed Budget for the Sewer Fund is $3.51million supported by $2.90 million in revenue. This budget includes $250,000 transfer out to the General Fund and $340,000 transfer out to the CIP Fund for capital improvement projects.

TABLE 2
FY 2023-25 PROPOSED BUDGET
SEWER FUND (Fund 6401)

FY 2022-23
Revised
Adopted
Budget
FY 2022-23
Projected Year-
End
(Unaudited)
FY 2023-24
Proposed
Budget
FY 2024-25
Proposed
Budget
Revenues

Sewer Fund
$2,882,168
$2,944,962
$2,901,544
$2,901,544
Transfers In
0 0
0 0
Total Revenues
$2,882,168
$2,944,962
$2,901,544
$2,901,544

Expenditures

Sewer Fund
$2,452,570
$1,928,569
$2,946,360
$2,918,409
Transfers Out
792,211
477,416
1,012,439
590,000
Total Expenditures
$3,244,781
$2,405,985
$3,958,799
$3,508,409

Surplus/(Deficit)
($362,613)
$538,977
($1,057,255)
($606,865)

Lynwood Utility Authority Lynwood Utility Authority 5
Resolution LUA_Adoption_of_FY_2023-25_Budget.docx

Fiscal Impact:

The FY 2023-25 Proposed Budget for the Lynwood Utility Authority will entail the use of any necessary bond funds or reserves, as presented in the FY 2023-25 Proposed Budget.

Coordinated With:

City Manager
City Attorney
ATTACHMENTS:

Description
Lynwood Utility Authority Lynwood Utility Authority 6
RESOLUTION NO.___________

A RESOLUTION OF THE LYNWOOD UTILITY AUTHORITY ADOPTING THE FISCAL YEAR 2023-25 BUDGET FOR THE WATER ENTERPRISE FUND AND SEWER

ENTERPRISE FUND
WHEREAS, the President and Members of the Lynwood Utility Authority Agency (LUA) reviewed the Fiscal Year 2023-25 Executive Director’s Proposed budget for the LUA, attached herein and made a part of this resolution through this reference; and WHEREAS, the agenda for the June 20, 2023 meeting of the Lynwood Utility Authority was duly posted, and the FY 2023-25 Executive Director’s Proposed Budget and all related agenda material were made available to the interested parties; and WHEREAS, the total FY 2023-24 Operating Proposed Budget for the Water Fund is $14.72 million supported by $11.65 million in Operating revenues. This budget includes $2.05 million in transfers-out from the Water Fund to the General Fund and CIP Fund to support various capital improvement projects; and
WHEREAS, the total FY 2024-25 Operating Proposed Budget for the Water Fund is $13.74 million supported by $11.65 million in Operating revenues. This budget includes $850,000 in transfers-out from the Water Fund to the General Fund and the CIP Fund to support various capital improvement projects; and
WHEREAS, the total FY 2023-24 Proposed Budget for the Sewer Fund is $3.96 million supported by $2.90 million in revenue. This budget includes $1.01 million in transfers out to the General Fund and the CIP Fund for capital improvement projects; and WHEREAS, the total FY 2024-25 Proposed Budget for the Sewer Fund is $3.51 million supported by $2.90 million in revenue. This budget includes $590,000 in transfers out the General Fund and CIP Fund for capital improvement projects.

NOW, THEREFORE, THE LYNWOOD UTILITY AUTHORITY DOES HEREBY RESOLVE AND DETERMINE AS FOLLOWS:

Section 1. The City Council of the City of Lynwood hereby finds and declares that the foregoing recitals are true and correct, and incorporates them herein as findings and as a substantive part of this Resolution.

Section 2. The Lynwood Utility Authority Budget for Fiscal Year 2023-25 for the Water Fund, Sewer Fund, and associated Enterprise Bonds is hereby adopted, and approved as presented in the FY 2023-25 Executive Director’s Proposed Budget as follows:
7 2
TABLE 1
FY 2023-25 PROPOSED BUDGET
WATER FUND (Fund 6051)
FY 2022-23
Revised
Adopted
Budget
FY 2022-23
Projected
Year-End
(Unaudited)
FY 2023-24
Proposed
Budget
FY 2024-25
Proposed
Budget
Revenues
Water Fund $12,108,799 $9,568,790 $11,648,026 $11,648,026 Transfers In 0 0 0 0
Total Revenues $12,108,799 $9,568,790 $11,648,026 $11,648,026 Expenditures
Water Fund $12,876,817 $11,856,636 $12,666,494 $12,889,903 Transfers Out 1,596,421 950,000 2,050,000 850,000
Total Expenditures $14,473,238 $12,806,636 $14,716,494 $13,739,903 Surplus/(Deficit) ($2,364,439) ($3,237,846) ($3,068,468) ($2,091,877) TABLE 2
FY 2023-25 PROPOSED BUDGET
SEWER FUND (Fund 6401)
FY 2022-23
Revised
Adopted
Budget
FY 2022-23
Projected
Year-End
(Unaudited)
FY 2023-24
Proposed
Budget
FY 2024-25
Proposed
Budget
Revenues
Sewer Fund $2,882,168 $2,944,962 $2,901,544 $2,901,544
Transfers In 0 0 0 0
Total Revenues $2,882,168 $2,944,962 $2,901,544 $2,901,544 Expenditures
Sewer Fund $2,452,570 $1,928,569 $2,946,360 $2,918,409
Transfers Out 792,211 477,416 1,012,439 590,000
Total Expenditures $3,244,781 $2,405,985 $3,958,799 $3,508,409 Surplus/(Deficit) ($362,613) $538,977 ($1,057,255) ($606,865) 8 3
Section 3. Authorize the Mayor to execute the Resolution for and on behalf of the City of Lynwood.

Section 4. This Resolution shall go into effect immediately upon its adoption.

Section 5. The City Clerk shall certify as to the adoption of this City Council Resolution.

PASSED, APPROVED AND ADOPTED this 20th day of June, 2023. _________________________
Oscar Flores
Mayor
ATTEST:
______________________________ __________________________ Maria Quinonez Ernie Hernandez
City Clerk City Manager
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
___________________________ __________________________
Noel Tapia Harry Wong
City Attorney Director of Finance & Administration
9 4

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a meeting held on the ___th day of _______, 2023.

AYES:

NOES:

ABSENT:

ABSTAIN:

________________________
Maria Quiňonez,
City Clerk

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2023.XXX on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this ____th day of _________, 2023.
___________________________
Maria Quiňonez,
City Clerk
10 5
11 1.

CALL TO ORDER

2. CERTIFICATION OF AGENDA POSTING BY SECRETARY

3. ROLL CALL OF MEMBERS
This Agenda contains a brief general description of each item to be considered. Copies of the Staff reports or other written documentation relating to each item of business referred to on the Agenda are on file in the Office of the City Clerk and are available for public inspection. Any person who has a question concerning any of the agenda items may call the City Manager at (310) 603-0220, ext. 200.

Procedures for Addressing the Council

IN ORDER TO EXPEDITE CITY COUNCIL BUSINESS, WE ASK THAT ALL PERSONS WISHING TO

ADDRESS THE COUNCIL SUBMIT YOUR COMMENTS IN ADVANCE TO
[email protected] OR FILL OUT A FORM PROVIDED AT THE PODIUM, AND TO TURN IT IN TO THE CITY CLERK PRIOR TO THE START OF THE MEETING. FAILURE TO FILL OUT SUCH A

FORM WILL PROHIBIT YOU FROM ADDRESSING THE COUNCIL IN THE ABSENCE OF THE UNANIMOUS CONSENT OF THE COUNCIL.

AGENDA
Lynwood Housing Authority

TO BE HELD ON
June 20, 2023
COUNCIL CHAMBERS - 11350 BULLIS ROAD. LYNWOOD, CA 90262 OR WEB CONFERENCE VIA ZOOM - TO PARTICIPATE VIA ZOOM OR BY TELEPHONE: 1-669- 900-9128 OR 1-253-215-8782 MEETING ID: 835 2029 8238
Duly Posted 6/17/23 By MQ
6:00 PM

Oscar Flores, Chair
Rita Soto, Vice Chair
Gabriela Camacho, Commissioner
Juan Munoz-Guevara, Commissioner
Jose Luis Solache, Commissioner

PUBLIC ORAL COMMUNICATIONS

(Regarding Agenda Items Only)

Lynwood Housing Authority 1

4. CONSENT CALENDAR

4.1 APPROVAL OF THE WARRANT REGISTER-LHA

NON-AGENDA PUBLIC ORAL COMMUNICATIONS

THIS PORTION PROVIDES AN OPPORTUNITY FOR THE PUBLIC TO ADDRESS THE

LYNWOOD UTILITY AUTHORITY ON ITEMS WITHIN THE JURISDICTION OF THE LYNWOOD UTILITY AUTHORITY AND NOT LISTED ON THE AGENDA. IF AN ITEM IS NOT

ON THE AGENDA, THERE SHOULD BE NO SUBSTANTIAL DISCUSSION OF THE ISSUE

BY LYNWOOD UTILITY AUTHORITY, BUT LYNWOOD UTILITY AUTHORITY MAY REFER

THE MATTER TO STAFF OR SCHEDULE SUBSTANTIVE DISCUSSION FOR A FUTURE MEETING. (The Ralph M. Brown Act, Government Code Section 54954.2 (a).)

ALL MATTERS LISTED UNDER THE CONSENT CALENDAR WILL BE ACTED UPON BY ONE MOTION AFFIRMING THE ACTION RECOMMENDED ON THE AGENDA. THERE

WILL BE NO SEPARATE DISCUSSION ON THESE ITEMS PRIOR TO VOTING UNLESS

MEMBERS OF THE COUNCIL OR STAFF REQUEST SPECIFIC ITEMS TO BE REMOVED FROM THE CONSENT CALENDAR FOR SEPARATE ACTION.

Comments:

City of Lynwood Housing Authority warrant register dated June 20, 2023 for FY 2022- 2023.

Recommendation:

Staff respectfully recommends that the Lynwood Housing Authority approve the warrant register dated June 20, 2023 for FY 2022-2023.

ADJOURNMENT
THE LYNWOOD HOUSING AUTHORITY MEETINGS WILL BE POSTED AS NEEDED. THE

NEXT MEETING WILL BE HELD IN THE COUNCIL CHAMBERS OF THE CITY HALL ANNEX, 11350 BULLIS ROAD, CITY OF LYNWOOD, CALIFORNIA.

Lynwood Housing Authority 2

AGENDA STAFF REPORT

DATE:

June 20, 2023
TO:

Honorable Mayor and Members of the City Council
APPROVED BY:

Ernie Hernandez, City Manager
PREPARED BY:

Harry Wong, Director of Finance & Administration
Lilly Hampton, Senior Accounting Technician
SUBJECT:

APPROVAL OF THE WARRANT REGISTER-LHA
LHA WARRANT RESOLUTION TEMPLATE.docx
WARRANT RUN 6 20 2023-LHA.pdf
Agenda Item # 4.1.

Recommendation:

Staff respectfully recommends that the Lynwood Housing Authority approve the warrant register dated June 20, 2023 for FY 2022-2023.

Background:

N/A
Discussion and Analysis:

N/A
Fiscal Impact:

FY 2022-2023
Coordinated With:

City Manager
City Attorney
ATTACHMENTS:

Description
Lynwood Housing Authority Lynwood Housing Authority 3
1 RESOLUTION NO. 2022.XXX
LHA - Warrant Register Dated 06-20-2023
PASSED, APPROVED and ADOPTED this 20th , day of June, 2023.

Oscar Flores, Chair
ATTEST:
_________________________
Maria Quiňonez, Ernie Hernandez,
Secretary Executive Director
APPROVED AS TO FORM:

Noel Tapia,
Authority Counsel
4 2

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quiňonez, the undersigned, City Clerk of the City of Lynwood/Secretary to the Lynwood Housing Authority, do hereby certify that the foregoing Resolution was passed and adopted by the Lynwood Housing Authority of the City of Lynwood at a regular meeting held on the 20th day of June, 2023, and passed by the following vote:

AYES: COMMISSIONERS MUNOZ, SOLACHE, CAMACHO VICE CHAIR SOTO

AND CHAIR FLORES
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
__________________________
Maria Quiňonez,
Secretary

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )
I, Maria Quiňonez, the undersigned, City Clerk of the City of Lynwood/Secretary to the Lynwood Housing Authority, do hereby certify that the above foregoing is a full, true and correct copy of Lynwood Housing Authority Resolution No. 2022.XXX on file in my office and that said Resolution was adopted on the date and by the vote therein stated.

Dated this _20th . day of June 2023.
____________________________
Maria Quiňonez,
Secretary
5 vchlist
06/12/2023 11 :32:49AM
Bank code : lhaus2
Voucher Date Vendor
Electronic Financial Transaction List
City of Lynwood
Invoice PO#
---- - --
10018 3/16/2023 012364 LYNWOOD FAMILY APARTMENTS, LP 20 1 Vouchers for bank code : lhaus2
1 Vouchers in this report
Description/Account

PROF & CONTRACTUAL SERVICE
Total:

Bank total:

Total vouchers :

Page: 1
Amount
697,274.86
697,274.86
697,274.86
697,274.86
Page : 1
6 vchlist
06/13/2023
Bank code :

Voucher
10310
3:46:26PM
lhaus2
Date Vendor
6/20/2023 007223 COX, CASTLE & NICHOLSON LLP
1 Vouchers for bank code :
1 Vouchers in this report
lhaus2
Check List
Lynwood Housing Authority
Invoice PO#
--------- -------
567522 11-002202
Description/Account

LEGAL SERVICES
Total:

Bank total:

Total vouchers :

Page: 2
Amount
1,465 .10
1,465.10
1,465.10
1,465.10
Page: 2
7

← All documents from this meeting