If there is a majority vote against the levy of an annual assessment as part of a Proposition 218 election, where such an assessment represents an increase from any previous year and is also outside the terms of an applicable covenant for that Zone, the proposed increase in the assessment must be abandoned. The assessment amount then reverts to the previous year’s assessment amount where no covenant exists or is adjusted to be consistent with the maximum assessment allowed for the covenant recorded for the property. If, as part of a Proposition 218 election, a majority vote in support of the assessment is received, the Council may adopt a resolution confirming the diagram and assessment. The adoption of the resolution will constitute the levy of an assessment for FY 2024/25.
DISCUSSION:
The assessments presented in this year’s Engineer’s Report reflect staff’s recommendation based on Council’s prior direction, recent opinions from the City Attorney’s office, and information provided by the Parks and Finance departments.
Up to now, the fund balance in each LMD has been used to “fill-in” the shortfall between revenues and expenses. The strategy of using fund balance does not appear to be an option for several LMDs. Finance is reporting that:
65 of the 80 Zones do not have adequate funding to fully maintain landscaping. 15 of the 80 LMDs no longer have any fund balance to cover this difference. The number of LMDs in a negative fund balance position will grow to 20 by the end of FY 2024/25
This disparity can be tied to several factors that include:
1. The inability to conduct a successful Proposition 218 election
2. Providing full maintenance at zones that have rejected a Proposition 218 election. While Parks field crews at one time received direction to reduce efforts to the level possible without obvious indications of reduced maintenance, that direction seems to have been dropped at some point in the past.
Staff is mindful that residents are critical of the cost of maintaining landscaping. This is clearly seen based on the history that suggests residents will reject an increase in assessments, regardless of how large or small the increase may be or how important it is to the visual appeal of the landscaping. As such, a request for additional revenue through a Proposition 218 process is not a guarantee, and past elections indicate the Proposition 218 process is more likely to fail than succeed.
The most recent Proposition 218 elections highlighted the consequences of a failed election wherein there appear to be only two available options to address the results of a failed election, as operational losses cannot be carried forward:
A reduction in service and quality, or
Contributions by the General Fund
Looking toward future years, and based on the interpretation of applicable laws, Proposition 218s are the only method currently available to increase assessment in future years once all zones’ expenses surpass what is allowed in the associated covenant.
Assessment Shortfalls
FY 2024/25 is projected to have an assessment shortfall of $131,726. A shortfall occurs when expenses in a zone exceed the amount of revenue it receives. However, if a zone has a surplus fund balance to absorb the shortfall, there is no effect on the General Fund. When considering zones that do not have a surplus fund balance, the General Fund is projected to absorb $62,642 in FY 2024/25 as noted in Table 1. As the number of zones depleting their fund balance surpluses increase, the amount absorbed by the General Fund will also increase.
However, it should be noted that in certain zones, a reduction in expenses may not be enough to prevent costs being absorbed by the General Fund. In some cases, without a successful Proposition 218 election, costs will continue to rise while assessment revenue remains fixed.
Actions to Reduce Gap Between Revenues and Expenses
Several specific factors are reflected in the proposed FY 2024/25 Engineer’s Report. Examples of these factors include estimated operating and administrative expenses in each Zone, recommended reserve amounts for cash flow, and allowances for semi-regular expenses like tree trimming. Each of these factors plays a part in the proposed assessment. In prior years, Council has provided direction on addressing these factors. A summary discussion of these factors is included in Attachment 2 to this report.
The FY 2023/24 Engineer’s Report projected $304,376 in direct landscape maintenance costs. A recent staff review has, however, indicated this figure is closer to $375,000. This larger value represents the costs of hiring additional part-time park employees. Based on this obvious impact to the LMD zone budgets, staff evaluated overhead charges with the goal of identifying areas where actual current efforts may not be reflective of the formulaic budget that set overhead costs at 30% of hard landscaping costs. As such, each department was asked to project the amount of time it expects to spend each FY administering the LMD program. Based on these estimates of actual time, staff believes overhead costs can be reduced by approximately $57,000 per year. Subject to council direction otherwise, this reduced amount has been factored into the FY 2024/25 Engineer’s Report.
Expenses may not match the amounts budgeted for each zone; the Finance Department will be analyzing each zone’s charges relative to its budget. Any charges that cannot be applied in the current FY will be added to the expenses projected in FY 2024/25.
Operational Losses
Negative fund balances older than the current FY (2023/24 in this case) cannot be carried forward, meaning the City cannot levy assessments to recuperate losses prior to the current fiscal year. An operational loss occurs when a zone fund balance and projected revenues are unable to cover the cost of maintenance activities.
Table 1 summarizes operational losses:
Table 1: Operational Losses by Fiscal Year
Fiscal Year Amount
Aggregate Losses prior to FY 2023/24 (to be absorbed by General Fund) $61,783 Fiscal Year 2023/24 (to be absorbed by General Fund) $40,831 Fiscal Year 2024/25 (Projected) $62,642
The increase from $40,831 to $62,642 represents:
Increased costs for both labor and materials associated with cost of living and step raises. 6 zones projected to fall into a deficit.
FISCAL IMPACT:
The General Fund is projected to subsidize operational losses of $62,642 in FY 2024/25. For the current fiscal year, the General Fund will absorb $40,831 that accrued in FY 2023/24 and $61,783 for years preceding FY 2023/24.
ALTERNATIVES:
Adjust individual or multiple Zones – Each adjustment results in changes that may be carried forward in future years in varying ways.
ATTACHMENTS:
1. Zone Location Map
2. LMD Cost Assessment Factors
3. Resolution
4. FY 2024/25 Engineer’s Report
Attachment 1
Zone Location Map
Attachment 2
LMD Cost Assessment Factors
Use of Fund Balance. Beginning in Fiscal Year (FY) 2012/2013, an analysis of available fund balances in many Zones indicated that assessments could be temporarily reduced or eliminated in those Zones while the fund balances were brought down to appropriate levels which better approximated actual expenses. In some cases, these reductions still need to continue. In others, the fund balances have been reduced appropriately, and the assessments have previously been or will be reset at a level where they equal expenses. Unsuccessful Assessment Increase. Where Proposition 218 hearings fail to increase assessments, Parks has previously attempted to reduce the level of maintenance to a point commensurate with available funding. At present, the cost of landscaping exceeds the amount of revenue generated in many zones.
Tree Trimming. Where funding is available, one-fourth of the trees in a Zone are trimmed annually. For those Zones that did not approve increases to assessments, tree trimming represents the first maintenance item to be removed; the assumption being that trees represented less of a visual impact than un-mowed grass or un-trimmed bushes. At present, tree trimming does not appear to have been curtailed to match funding levels. Water Usage Costs. The water usage fee is included in the recommended Engineer’s Report based on the square footage of landscaping within each Zone. As previously noted, this fee will transition to a metered cost in all Zones as meters continue to be installed at the various water service locations. A review of the current utility charges shows that 17 Zones of the total 80 have some form of metering. The status of the 63 remaining Zones is unknown at present. Continuation of these installations is expected to be complete in the next 12 to 18 months as part of an upcoming Capital Improvement Project. Reserve for Cash Flow. This reserve may be held per Section 22569 of the Streets and Highways Code. The maximum amount (accrual) and defined target for the Zones is equivalent to the estimated costs of maintaining the Zones between July 1 and December 10.
The maximum amount would be accrued over the course of as much as 5 years to reduce the magnitude of recommended assessment increases when they do occur. Prior to this reserve going below zero in any given year, a Proposition 218 Hearing should be implemented to increase assessments.
Attachment 3
Resolution
RESOLUTION NO. 24-________
A RESOLUTION OF INTENTION OF THE CITY COUNCIL OF THE CITY OF
MADERA, CALIFORNIA, TO LEVY AND COLLECT ANNUAL ASSESSMENTS
FOR CITY WIDE LANDSCAPE AND LIGHTING DISTRICT ZONES OF BENEFIT 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10-D, 10-E, 10-F, 10-G, 10- H,10-I, 12, 13, 14, 15, 15-B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20- B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29, 29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37, 39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46, 50 & 51 for FY 2024/25 AND SETTING DATE FOR PUBLIC
HEARING
WHEREAS, the City Council has heretofore, provided for the formation of a City Wide Assessment District (District) pursuant to the Landscape and Lighting Act of 1972 (the “Act”) and provided for the inclusion of Zones 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10-D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29, 29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37, 39, 40, 41, 43-A, 43- C, 43-D, 43-E, 44, 45-A, 46, 50 & 51 into said District; and WHEREAS, the City Council initiated proceedings to levy annual assessments for the above-referenced zones and directed the City Engineer to prepare and file this report with the City Council as required by Streets and Highways Code Section 22565 et seq.; and WHEREAS, the City Engineer has prepared an Engineer’s Report which has been filed with the office of the City Clerk for submission to the City Council, setting forth a full and detailed description of the improvements, the boundaries of the assessment district, the zones of benefit therein and the proposed assessments upon assessable lots and parcels of land within the District to which reference is hereby made for full particulars. The boundaries of the zones of benefit within the city-wide assessment district and the improvement therein are as generally described in the Engineer’s Report; and
WHEREAS, the City Council approved the Engineer’s Report on June 19, 2024; and WHEREAS, adjustments to assessments reflect the increasing costs of landscaping, administrative overhead, and the goal of a 5-year fund balance that attempts to maintain a steady fund balance; and
WHEREAS, increased expenses for FY 2023/24 may exceed the amounts budgeted for FY 2023/24; and
WHEREAS, Finance will review FY 2023/24 expenses for each zone relative to its budget and pay expenses as budgets allow; and
WHEREAS, any expenses that cannot be paid for in FY 2023/24 will be added to that zone’s budget in FY 2024/25, in addition to expenses projected in the FY 2024/25 Engineer’s Report; and
WHEREAS, the City Council is required to set a hearing where all interested persons shall be heard on the question of the levy and collection of the proposed assessments.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MADERA HEREBY finds, orders, and resolves as follows:
1. The above recitals are true and correct.
2. The Engineer’s Report has been prepared and has been filed with the office of the City Clerk for submission to the City Council and has been approved by the City Council.
3. It is the intention of the Madera City Council to levy and collect assessments for the 2024/2025 fiscal year in accordance with that determined in the Engineer’s Report for City Wide Landscape and Lighting District Zones of Benefit 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10-D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-D, 26, 26-B, 26-C,26-D, 27, 27- B, 28, 28-B, 29, 29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-B, 33, 34, 34-B, 34-C, 35, 36- A, 36-B, 36-C, 37, 39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46, 50 & 51 for Fiscal Year 2024/25.
4. The Landscape and Lighting District Zones of Benefit which generally include but are not limited to park strip and median landscaping are in general conformity to those originally formed and no changes have been made or are proposed to these improvements as part of this action.
5. A Public Hearing shall be held at a regular meeting of the Madera City Council on July 17, 2024, at 6:00 p.m. in the City Council Chambers located at 205 W. 4th Stret, Madera, CA for all interested persons to be heard on the question of the levy and collection of the proposed assessments and for the Council to consider the Proposed Fiscal Year 2024/2025 Assessments for the above-referenced Zones.
6. A 10-day public hearing notice shall be published in the Madera Tribune advertising the date, time, and place of the July 17, 2024, hearing date.
7. Written protests may be filed with the City Clerk at any time prior to the conclusion of the hearing. A written protest shall state all grounds of objection and shall contain a description sufficient to identify the property owned by the protesting person or persons.
8. Authorizes the Finance Department to include any expenses from FY 2023/24 that exceed a zone’s budget in the FY 2024/25 budget, these will be included in each zone in addition to the projected expenses as part of the FY 2024/25 Engineer’s Report.
9. This resolution is effective immediately upon adoption. * * * * *
Attachment 4
FY 2024/25 Engineer’s Report
RECORDING REQUESTED BY
AND MAILED TO:
NAME: CITY OF MADERA
STREET: 205 W. 4TH STREET
CITY: MADERA, CA 93637
ATTENTION: CITY CLERK
-------------------------------------------------------------------------------------------------------------------------------
CITY OF MADERA
ENGINEERING DEPARTMENT
COUNTY OF MADERA, STATE OF CALIFORNIA
------------------------------------------------------------------------------------------------------------------------------- ENGINEER’S REPORT
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
2024-2025 ASSESSMENT
Keith Brent Helmuth
City Engineer
City of Madera
_____________________________________________
Date
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10- D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-
B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-
B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-
D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29,
29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-
B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37,
39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46,
50 & 51
ENGINEER’S REPORT
FOR CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10- D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-
B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-
B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-
D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29,
29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-
B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37,
39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46,
50 & 51
2024-2025 ASSESSMENT
TABLE OF CONTENTS
LANDSCAPING ZONES BY SUBDIVISION ….............................................................................3 ASSESSMENT SPREAD METHODOLOGY ..………………………………………………………..7 METHOD OF ASSESSMENT BY ZONE ..……………………………………………………………8 COSTS PER ZONE / ASSESSMENT ROLLS ………………………………………………………29 ASSESSMENT DIAGRAM / MAPS .…………………………………………………………………30
CERTIFICATION OF FILING AND CONFIRMATION OF ASSESSMENT
TO THE ENGINEER’S REPORT FOR
CITY OF MADERA LANDSCAPE MAINTENANCE DISTRICT
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10- D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-
B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-
B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-
D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29,
29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-
B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37,
39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46,
50 & 51
2024-2025 ASSESSMENT
The Undersigned respectfully submits the enclosed reports as directed by the City Council on ___________, 2024.
BY: _________________________________
Keith Brent Helmuth, City Engineer
Certification of Filing with City.
I, Alicia Gonzales, City Clerk of the City of Madera, do hereby certify that the foregoing assessments, together with the diagrams attached thereto, were filed with me on ______, 2024.
BY: __________________________________
Certification of Approval and Confirmation by City Council I, Alicia Gonzales, City Clerk of the City of Madera, do hereby certify that the foregoing assessments, together with the diagrams attached thereto, were approved, and confirmed by the City Council of the City of Madera on __________________, 2024.
BY: __________________________________
Certification of Filing with Superintendent of Streets
I, Keith Brent Helmuth, City Engineer of the City of Madera, hereby certify that the foregoing assessments together with the diagrams attached thereto, were recorded in my office on __________________, 2024.
BY: _____________________________________
Certification of Filing with the County Auditor
I, Catherine Nainoa, Auditor of the County of Madera, do hereby certify that the foregoing assessments, together with the diagrams attached thereto, were filed in my office ________________________, 2024.
BY: _____________________________________
Catherine Nainoa
Supervising Accountant/Auditor
LANDSCAPING ZONES BY SUBDIVISION
ZONE # ZONE NAME
1 AIRPORT BUSINESS PARK
2 PHEASANT RUN/NORTHWEST ESTATES
3 MANSIONETTE ESTATES 1, 2, & 3
4 WESTGATE NORTHWEST 1 & 2
6A WOODLAND HILLS/BASILA
6B SUNSET SOUTHWEST 1, 2, 3, 4, & 5
7 TOWN & COUNTRY ESTATES
8 VINEYARD ESTATES II, III, IV &V
9 ORCHARD ESTATES & ORCHARD ESTATES No. 2
10A VENTURI SUBDIVISION
10B PEBBLE BEACH I & II
10C PEBBLE BEACH III & IV
10D PEBBLE BEACH V
10E PEBBLE BEACH VI
10F PEBBLE BEACH VII
10G PEBBLE BEACH VIII
10H PEBBLE BEACH IX
10I PEBBLE BEACH X
12 FRENCH COVE 1 & 2
13 LAS PALMAS ESTATES I, II, III & IV
14 CAPISTRANO 1 & 2
15 CLINTON / ELM RANCHOS 1
15B CLINTON / ELM RANCHOS 2
15C CLINTON / ELM RANCHOS 3
16 SUGAR PINE ESTATES
17A CAPISTRANO X, PHASES 1 & 2 & TUSCAN VILLAGE
17B CAPISTRANO X, PHASE III
17C CAPISTRANO X, PHASE IV
17D CAPISTRANO XI, PHASE I
18 LINCOLN PLACE, PHASE I, II & III
20A LA JOLLA ESTATES, PHASE 1
20B LA JOLLA ESTATES, PHASE 2
20C LA JOLLA ESTATES, PHASE 3
ZONE # ZONE NAME
21A HOME RANCH I
21B HOME RANCH II
21C HOME RANCH III
21D HOME RANCH IV AND MELANIE MEADOWS I
23 ELM ESTATES II
24 VISTA DEL SIERRA (RDA)
25C COTTONWOOD ESTATES III
25D COTTONWOOD ESTATES IV
26 CORDOVA ESTATES PHASE I & II
26B CORDOVA ESTATES PHASE III
26C CORDOVA ESTATES PHASE IV
26D OAKWOOD ESTATES
27 VINEYARD WEST I
27B VINEYARD WEST II
28 CAPISTRANO XII & XIV
28B CAPISTRANO XIII
29 CHATEAU AT THE VINEYARDS, PHASE I
29B CHATEAU AT THE VINEYARDS, PHASE II
29C CHATEAU AT THE VINEYARDS, PHASE III
29D CHATEAU AT THE VINEYARDS, PHASE IV
29E CHATEAU AT THE VINEYARDS EAST
30 YOSEMITE ESTATES
31A HIGHLANDS AT RANCHO VALENCIA PHASE I
31B HIGHLANDS AT RANCHO VALENCIA PHASE II
32A LA JOLLA NORTH PHASE I
32B LAN JOLLA NORTH PHASE II
33 SOUTH STAR ESTATES
34 KENNEDY ESTATES PHASE I & II
34B KENNEDY ESTATES PHASE III
34C KENNEDY ESTATES PHASE IV
35 SANTA BARBARA ESTATES
36A MARIPOSA ESTATES I
36B MARIPOSA ESTATES II
36C OLIVE ESTATES
37 ALMOND TREE ESTATES
39 CARMEL HOMES III AND VARBELLA
40 TIERRA VISTA ESTATES
41 POND PLACE
ZONE # ZONE NAME
43A ORCHARD POINT ESTATES PHASE I & II & BRAWLEY
43C EL CORONADO ESTATES
43D ALMOND VILLAGE ESTATES
43E TAYLOR ESTATES
44 SIERRA VISTA ESTATES PHASE III
45A SIENNA ESTATES
46 CAPISTRANO XVII
50 SUGAR PINE VILLAGE
51 RED ROCK RETAIL CENTER, ET AL
ENGINEER’S REPORT
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
2024-2025 ASSESSMENT
WHEREAS, on June, 1991 the City Council of the City of Madera by resolution provided for the creation of a Landscape Maintenance District to provide funds to the City for the maintenance of landscaping within street medians, street park strips, and easements included as a part of said District, the entire City shall be designated as one District composed of separate Landscape Maintenance Zones, and
NOW THEREFORE, I, Keith Brent Helmuth, Engineer of Work for the City of Madera, do hereby assess and apportion the total estimate of cost of the formation, servicing, and maintenance of the referenced Zones upon the several lots or parcels of land benefited, as more particularly set forth in the assessment rolls filed herewith, marked Exhibit “C” and incorporated herein by reference. The numbers on said assessment roll correspond with the assigned numbers upon the assessment diagrams filed herewith, marked Exhibit “D”, and incorporated herein by reference. Said assessment is made upon the several lots or parcels of land within the Zones in proportion to the estimated benefits to be received by said lots of parcels of land for said maintenance. A description of the method used to estimate those benefits is presented below.
PLANS AND SPECIFICATIONS
Improvement Plans, Tract Map, and Conditions of Approval have been used to determine landscaped areas within each Zone. Such detailed plans have been prepared by the various project developers and are on file with the City of Madera.
ESTIMATE OF COSTS
The amounts to be assessed and a breakdown of these costs are provided in the Exhibit “C”.
These costs are based upon the best estimates available at the time of preparation of this report.
Since this report will be a yearly document for the continuation of each maintenance Zone, any costs not spent by the City of Madera during the referenced fiscal year will be credited to assessments in future years. Conversely any costs underestimated during the referenced year will be recovered by assessments in future years.
ASSESSMENT DIAGRAM
The maps entitled “ASSESSMENT DIAGRAM“ are incorporated herein, and sets forth the lots of parcels of land, and assigns each individual parcel a distinctive number for reference to the assessment roll. Each of the properties included within each referenced Zone is identified by an Assessment Parcel Number.
DATED: __________________________________
SIGNED: __________________________________
ENGINEER OF WORK FOR THE CITY OF MADERA
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10-D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29, 29-B, 29-C, 29-D, 29-E, 30, 31-A, 31- B, 32-A, 32-B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37, 39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46, 50 & 51
Exhibit ‘A’
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10-D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-D, 26, 26- B, 26-C,26-D, 27, 27-B, 28, 28-B, 29, 29-B, 29-C, 29-D, 29-E, 30, 31- A, 31-B, 32-A, 32-B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37, 39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46, 50 & 51
2024-2025 ASSESSMENT
ASSESSMENT SPREAD METHODOLOGY
PROPERTY RELATED BENEFIT
Property-related benefit must provide a specific, rather than general, benefit to each property being assessed in proportion to at least the amount of assessment.
The installation and maintenance of landscaping of park strips, median islands along major streets, median islands within developments/subdivisions, and certain out-lots, were requirements for obtaining favorable development entitlements which provide a specific benefit to the newly created properties, all as more particularly described on Exhibit “B”.
GENERAL BENEFIT
General benefit is defined as any benefit that does not confer specific benefit via a propertyrelated service or capital improvement. General benefits can be determined to benefit the property within the District/Zone and/or the public at large. The landscaping in median islands located in major streets results in an attractive transportation corridor for the community in conformance with the City’s General Plan, and thereby providing some degree of general benefit as well as, a specific benefit to adjoining properties.
FY 2024-2025 ASSESSMENT
In accordance with the definitions of Proposition 218, the properties in each case are being assessed for their prorate share of costs to maintain the landscaping in park strips along major streets adjacent to the respective developments/subdivisions, in median islands located within the development/subdivision, in certain outlots. Costs include maintenance of trees, shrubs, sprinkler systems, fertilizer, weed control and general maintenance and repair or replacement when required. The assessment may be increased annually to the range of the assessment in the amount of the Engineering News Record Constructions Cost Index (Los Angeles, plus two percent).
In accordance with Proposition 218, the owners of land with a majority of the total cost of assessments did heretofore approve the assessments for landscape maintenance on June 4, 1997, June 3, 1998, July 16, 1999, July 19, 2000, April 4, 2001, June 6, 2001, June 5, 2002, August 21, 2002, July 16, 2003, September 1, 2004, August 3, 2005, August 16, 2006, August 15, 2007, August 20, 2008 and August 5, 2009, July 21, 2010, August 3, 2011, August 1, 2012, August 7, 2013, June 4, 2014, July 1, 2015, July 20, 2016, July 19, 2017, August 1, 2018, July 3, 2019, and July 15, 2020, or was required as a condition of approval of the subdivision.
Exhibit ‘B’
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10-D, 10-E, 10-F, 10-G, 10- H,10-I, 12, 13, 14, 15, 15-B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20- B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29, 29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37, 39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46, 50 & 51
2024-2025 ASSESSMENT
METHOD OF ASSESSMENT BY ZONE
ZONE 1 – Airport Business Park
Landscape easements along the east and west side of Airport Drive from Aviation Drive to Avenue 17 were included as part of the Airport Business Park Improvement Plans and are also required for proposed future development within the boundaries established herein. Therefore, it is incumbent upon all property owners within the boundaries to account for their fair share of the costs to maintain the landscaped areas.
There are 45 parcels within the Airport Business Park included in this Zone, all of them zoned for commercial use. Assessments for maintenance of the above improvements have been spread based upon parcel area of all properties within the Zone and frontage length of those properties fronting the landscaped areas along Airport Drive. The proportions will be such that 75 % of the total assessment will be spread on the basis of lot area and the remaining 25 % will be spread on the basis of frontage length along Airport Drive.
ZONE 2 – Pheasant Run/Northwest Estates
Landscaping along the north right of way of Cleveland Avenue and along the east right of way of Granada Drive was included as conditions of approval of plans for Pheasant Run Subdivision.
Landscaped median islands along Schnoor Avenue between Cleveland Avenue and Avenue 16 were included as conditions of approval of plans for Northwest Estates Subdivision and proposed future development within the boundaries established herein. A portion of the future Cleveland Avenue median landscaping was also included as an assessable item within the Zone. The assessments include fifty percent of the costs for maintaining of the median island landscaping on Schnoor and Cleveland Avenues. Therefore, it is incumbent upon all property owners within the boundaries to account for their fair share of the costs to maintain the landscaped areas.
There are 173 (Assessment Numbers 10-182) single-family residential lots within Pheasant Run Subdivision Nos. 1, 2 and 3 and 97 single-family residential lots within Northwest Estates Subdivision Nos. 1-5 & 7 (Assessment Numbers 183-220 and 237 –278 and 281- 297).
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each residential lot, for a total of 260 unit assessments for residential property.
Assessment Numbers 279 and 280, and Parcel 1 in Book 35 of Maps at Page 27 of Madera County Records (Assessment No. 232) and Parcels A through O in Book 42 of Maps at pages 107 and 108 of Madera County Records (Assessment Nos. 221 through 226 zoned professional office) and all property east of Schnoor Avenue within Zone 2 (319-328) are currently zoned commercial. The number of units assigned to each commercial lot was determined by dividing their respective areas by 0.15 acre, which is the average area of the single-family residential lots within the Pheasant Run and Northwest Estates subdivisions.
ZONE 3 – Mansionette Estates, Phases 1, 2, 3
Landscaped medians along Schnoor Avenue between Cleveland Avenue and the Fresno River and a portion of the Cleveland Avenue median landscaping were conditions of approval of proposed future development within the boundaries of Mansionette Estates 1, 2, & 3. Therefore, it is incumbent upon all property owners within the boundaries to account for their fair share of the costs for maintenance of the median island landscaping in Schnoor Avenue. The assessments include fifty percent of the cost for maintenance of the landscaping of the MID canal right of way.
Parcel 1 and 2 in Book 49 of Maps at Page 9 of Madera County Records (Assessment Numbers 7 and 8) and Parcels 1 and 2 in Book 43 of Maps at Pages 9 and 10 of Madera County Records (Assessment Number 10 and 11) and parcel 3 and 4 in Book 43 of Maps at Pages 9 and 10 of Madera County Records (Assessment number 9) were combined per document 2006017711 to form one parcel and Parcels 1, 2 and 4 in Book 38 of Maps, at Page 87 of Madera County Records (Assessment Numbers 2, 3, and 4) and Parcel 1 and 2 in Book 39 of Maps at Page 129 of Madera County Records (Assessment Numbers 5 and 6) are currently zoned commercial. Parcel A in Book 37 of Maps, at Pages 102-104 of Madera County Records (Assessment Number 1) is currently zoned multi-family residential. The number of unit assessments assigned to each commercial lot and multi-family lot was determined by dividing their respective areas by 0.17 acre, which is the average size of the single family residential lot within Mansionette Estates, Phase 1, 2, & 3.
Parcel B in Book 37 of Maps, at Pages 102-104 of Madera County Records has been subdivided into two lots. The northerly lot has been further divided into 34 single family residential lots within Mansionette Estates Phase III Subdivision in Book 42 of Maps at Pages 143 and 144 of Madera County Records (Assessment Number 106 through 139). There are 159 single-family residential lots within Mansionette Estates Subdivision Phase I and II in Book 37 of Maps at Pages 103 and 104 of Madera county Records (Assessment Numbers 12 through 105). Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each residential lot. The southerly lot (Assessment Numbers 172 and 173) cannot be developed and will not be assessed.
There are 193 unit assessments for residential property, and 11unit assessments for commercial areas.
ZONE 4 – Westgate Northwest, Phases I & II
A condition of approval of the Westgate Northwest subdivision required landscaping of the following areas.
1. A median island in North Westberry Boulevard, between Sunset Avenue and Riverview Drive;
2. A median island in Double Tree Way between Sunset Avenue and Boulder Avenue;
3. A median island in Castle Way between Double Tree Way and Countess Lane.
4. The planter strip along the east right of way of Westberry Boulevard, contiguous to the subdivision; and,
5. The planter strip along the north right of way of Sunset Avenue contiguous to the subdivision.
The proposed landscape area between Riverview Drive and the Fresno River was also added as an assessable item within the Zone. Therefore, it is incumbent upon all property owners within the boundaries to account for their fair share of costs to maintain the landscaped areas.
There are 106 zero lot line, family residential lots and 57 standard, single-family residential lots within Westgate Northwest Phase I. There are 90 single family residential lots within Phase II of Westgate Northwest after numerous Lot Line Adjustments.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each zero lot line residential lot and two units of assessment per each standard residential lot, which are approximately twice the acreage of the zero lot line residential lots.
ZONE 6A – Woodlands/Basila
Landscaping of certain areas was a condition of approval for the Woodland Subdivision, the Woodlands Subdivision No. 2, and the Basila Subdivision in Madera. Landscape areas are located along Woodlands Drive, Woodlands Court, Cedar Creek Lane and Westberry Blvd, all within or adjacent to the above subdivision and streets. The median island landscaping along Westberry Blvd between Sunset Avenue and the south property line of Basila Subdivision, Phase 2 and 3 shall be included in the assessments at a rate of 50% of the costs of maintenance.
There are 108 single family residential lots within Woodland Subdivision, Woodland Subdivision No. 2, Basila Subdivision, and Basila Subdivision Phases 2 and 3. Assessment for maintenance of these improvements has been spread based upon one unit of assessment per each of the 109 residential lots.
The remaining two parcels (009-300-010-000 & 009-300-009-000) have been assessed for maintenance of these improvements and has been spread based upon one unit of assessment per each of the 109 residential lots.
ZONE 6B – Sunset Southwest, Phases 1, 2, 3, 4 & 5
Landscaping was required by conditions of approval for Sunset Southwest Subdivision, Phases I through 5 including Kimmel Avenue, the south side of Sunset Avenue, the west side of Westberry Boulevard and 50% of the median in Westberry Boulevard, all within or adjacent to the above subdivision and streets.
There are 139 residential lots within Sunset Southwest Subdivision, Phases1 through 5.
Assessment for maintenance of these improvements has been spread based upon one unit of assessment per each of the 139 residential lots.
ZONE 7 – Town & Country Estates
Landscaped medians along Merlot Avenue, landscaping within the west right of way of S.
Granada Drive and the north right of way of W. Almond, and maintenance of the paved emergency access easement were included as conditions of approval of the Town and Country Estates subdivision. Therefore, it is incumbent upon all property owners within these boundaries to account for their fair share of costs to maintain the landscaped areas.
There are 137 single-family residential lots within Town & Country Estates, which benefit from the landscaped frontage along Granada Drive and the landscaped median in Merlot Avenue.
Assessments for maintenance of the landscape improvements have been spread based upon one unit of assessment per each of the 137 residential lots.
Assessment Numbers 138, 139 and 140 are zoned for multi-family residential units. The apartment units front Almond Avenue and a portion of Granada Drive. The apartments isolate the single-family lots from any benefit of landscaping along these roads. Therefore maintenance costs associated with this landscaping will be applied only to the multi-family residential units once established. No maintenance costs are assumed for the 30-foot wide access easement through the apartment complex since it is temporary and will be replaced by a parking lot.
The number of units assigned to each multi-family residential lot, was determined by dividing their respective areas by 0.16 acre, which is the average size of the single-family residential lot within the Town and Country Estates subdivision.
ZONE 8 – Vineyard Estates Subdivision, Phases II, III, IV & V Conditions of approval of the plans for the Vineyards Subdivision 2, 3, 4 and 5, required maintenance of the landscaped areas noted below:
1. The park strip along the north right of way of Pecan Avenue;
2. The landscape easement along the north side of Pecan Avenue;
3. The landscape easement adjacent to the storm drainage pond; and,
4. The landscape buffer within the right of way along the north and south sides of Gary Lane.
Therefore, it is incumbent upon all property owners within these boundaries to account for their fair share of the costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 193 single family residential lots within the Vineyards Subdivision No. 1, 2, 3, 4 and 5.
Assessment Numbers 52, 53 and 54 are currently zoned commercial. The number of units assigned to each commercial lot was determined by dividing their respective areas by 0.14 acre, which is the average size of the single family residential lot within Vineyards, Phases II, III, IV and V.
The assessments for Assessment Numbers 1-51 and 55-196 may increase if future development requires landscaping along Monterey Avenue, Gary Lane or Pecan Avenue.
ZONE 9 – Orchard Estates & Orchard Estates No. 2
Landscaping in the park strip located along the North right of way of Pecan Avenue was included as a condition of approval of plans for the Orchard Estates Subdivision. Therefore, it is incumbent upon all property owners within the boundaries of Orchard Estates Subdivision and Orchard Estates Subdivision No. 2 to account for their fair share of the costs to maintain the landscaped areas.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 66 single family residential lots within Orchard Estates Subdivision and Orchard Estates Subdivision No. 2, and the 2 other residential lots within Zone 9, for a total of 68 units of assessment.
ZONE 10 A – Venturi Subdivision
The landscape park strip along the north side of Sunset Avenue from Shannon Avenue to 630 feet to the east line of the subdivision and the park strip along the east side of Shannon Avenue, located between 248 feet and 428 feet (180) north of Sunset Avenue, was included as a condition of approval of the plans for the Venturi Subdivision. The entry gate to the subdivision has 180 square feet of landscaping. Assessments for maintenance of the above improvements have been spread based upon one unit of assessment for each of the 13 lots within the Venturi Subdivision.
ZONE 10B – Pebble Beach, Phase I & II
A condition of approval for Pebble Beach Estates Ph II was maintenance of the west park strip along Schnoor Avenue, North and South of Riverview Drive, through the creation of Zone 10B.
There are 39 single-family residential lots in Pebble Beach Estates, Phase II within Zone 10B.
Eight (8) single-family residential lots within Pebble Beach Estates, Phase I are included in Zone 10 B for the maintenance of landscaping along the north right-of-way of Sunset Avenue, just West of Shannon Avenue. It is incumbent upon the property owners within the boundaries of the subdivision to account for their fair share of the costs to maintain the landscaped areas.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 47 single-family residential lots within Pebble Beach Estates, Phase I and Phase II.
ZONE 10C – Pebble Beach, Phase III & IV
A condition of approval of Pebble Beach Estates Phases III and IV was maintenance of the West park strip along Schnoor Avenue, North and South of Riverview Drive. All parcels within the subdivision are specifically benefited by the maintenance of the landscaped park strip. Therefore it is incumbent upon the property owners within the boundaries to account for their share of the costs to maintain the landscaped areas.
There are 21 single-family residential lots within Pebble Beach Estates Phase III and 29 singlefamily residential lots within Pebble Beach Estates Phase IV. Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 50 residential lots within Pebble Beach Estates Phases III and IV.
ZONE 10D – Pebble Beach, Phase V
Maintenance of the landscape planter strip along the west side of Schnoor Avenue between 90 feet South and 360 feet North of University Avenue was a condition of map approval of the Pebble Beach Estates Phase V subdivision. There are 27 single-family residential lots within Pebble Beach Estates Phase V. It is incumbent upon the property owners within the boundaries of the subdivision to account for their fair share of the costs to maintain the landscaped areas.
Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 27 residential lots within Pebble Beach Estates Phase V.
ZONE 10E – Pebble Beach, Phase VI
A condition of approval of Pebble Beach Estates, Phase VI was the maintenance of landscaping of several park strips, located:
1. Along the west side of North Schnoor Avenue between a point located 250 feet south of University Avenue, to a point located 800 feet north of University; and,
2. Along the north side of Sunset Avenue from Shannon Drive to Mainberry Drive.
All parcels within the subdivision are specifically benefited by the maintenance of the landscaped median and park strip. Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 22 residential lots within Pebble Beach Estates Phase VI.
ZONE 10 F – Pebble Beach, Phase VII
A condition of approval of Pebble Beach Estates, Phase VII was a requirement to maintain landscaping in park strips located on the west side of North Schnoor Avenue and along the north side of West Sunset Avenue adjacent to the Pebble Beach Phase I subdivision. All parcels within the subdivision are specifically benefited by the maintenance of the landscaped park strips.
Therefore, it is incumbent upon the property owners within the boundaries to account for their fair share of the costs to maintain the landscaped areas.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 41 residential lots within Pebble Beach Estates, Phase VII.
ZONE 10G – Pebble Beach Estates Phase VIII
A condition of approval of Pebble Beach Estates, Phase VIII was the maintenance of landscaping of two park strips:
1. Along the west side of N. Schnoor Avenue; and
2. Along the north side of W. Sunset Avenue all adjacent to Pebble Beach Phase I.
It is incumbent upon the property owners within the boundaries of the subdivision to account for their fair share of the costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 46 residential lots within Pebble Beach Estates Phase VIII.
ZONE 10 H – Pebble Beach, Phase IX
A condition of approval of Pebble Beach Estates, Phase IX was a requirement to maintain landscaping and irrigation, including trees along the park strip on the west side of North Schnoor Avenue and the landscaping and irrigation, including trees along the park strip on the north side of West Sunset Avenue all adjacent to the Pebble Beach Subdivision. All parcels within the subdivision are specifically benefited by the maintenance of the landscaped parkstrip. Therefore, it is incumbent upon the property owners within the boundaries to account for their fair share of the costs to maintain the landscaped areas.
There are fifty-three (53) single-family residential lots within Pebble Beach Estates, Phase IX within Zone 10H. Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each residential lot within Pebble Beach Estates, Phase IX.
ZONE 10 I – Pebble Beach, Phase X
A condition of approval Pebble Beach, Phase X, was the requirement for landscaping and irrigation, including trees, along the park strip on the west side of N. Schnoor Avenue, and the landscaping and irrigation, including trees along the park strip on the north side of W. Sunset Avenue all adjacent to the Pebble Beach Estates Phase X Subdivision.
There are twenty-one (21) single-family residential lots and 1 multi-family lot within Pebble Beach Estates Phase X within Zone 10I. Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each residential lot within the Pebble Beach Estates Subdivision Phase X.
ZONE 12 – French Cove Phase I & II
A condition of approval of plans for French Cove Phase I and Phase II, included the following landscaped areas:
1. The planter strip on the West side of Westberry Blvd. from 107 feet South of Double Tree Way to the South right of way line of Riverview Drive;
2. The median island in Doubletree Avenue between Summer Set Lane and Westberry Blvd;
3. The median island in Tragon Street between Tragon Way and Summer Set Lane;
4. The planter strip on the North side of Riverview Drive between Summer Set Lane and Westberry Blvd.; and,
5. One-half of the median islands on Westberry Blvd. along the entire east boundary of the subdivision.
The landscaped park strips and the local street medians, provide a zone of benefit to all parcels within the two subdivisions. Therefore, one hundred percent of the maintenance costs for areas 1, 2, 3, 4, and 5 noted above, will be equally shared by the single-family lots within French Cove Phases I and II. The landscaped median in Westberry Blvd. however, provides a zone of benefit to the City at large. Therefore, the maintenance costs for this median island will be equally shared between the City and all single-family lots within the two subdivisions. There are 33 single-family residential lots in French Cove Phase I and 46 single-family residential lots in French Cove Phase II, for a total of 79 unit assessments.
ZONE 13 – Las Palmas Estates, Phases I, II, III & IV
A condition of approval of Las Palmas Subdivision Phases I, II, III and IV, was maintenance of the park strip located on the South side of Olive Avenue along the frontage of Phase I and the median island landscaping located in Varbella Park between Varbella Way and La Perla Way. It is therefore incumbent upon the property owners within the boundaries of Las Palmas Subdivision Phases I, II, III and IV to account for their fair share of the costs to maintain the landscaped areas.
There are 22 lots in Phase I, 26 lots in Phase II, 9 lots in Phase III, and, 11 lots in Phase IV, all within Zone 13. Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 68 residential lots within Las Palmas Estates Subdivision.
ZONE 14 – Capistrano, Phases I & II
Landscaping along the north side of Almond Avenue along the frontage of Capistrano Subdivision Phase I, and the east side of Stadium Road along the frontages of said Phase I and Capistrano Subdivision Phase II, was required as a condition of approval of the plans for said Phases I and II. Therefore, it is incumbent upon all property owners within the boundaries of the Capistrano Subdivisions, to account for their fair share of costs to maintain the landscaped areas.
There are 115 single-family residential lots in Zone 14. Assessment for maintenance of the above landscaped areas has been spread based upon one unit of assessment per each residential lot within the Capistrano Subdivisions.
ZONE 15 – Clinton/Elm Ranchos, Phase I
Landscaping of the planter strip along the southeast side of Clinton Avenue, for the full frontage of the Clinton-Elm Ranchos Subdivision, from Fig Avenue to Elm Avenue, was required by the conditions of approval of the plans. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of the costs to maintain the landscaped areas.
There are 19 single-family residential lots within the Clinton/Elm Ranchos Subdivision in Zone 15.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each residential lot within Clinton/Elm Ranchos Subdivision.
ZONE 15B – Clinton/Elm Ranchos, Phase II
Maintenance of the landscaped planter strip along the southeast side of Clinton Avenue from Fig Avenue to Elm Avenue was required by the conditions of approval of the plans for the Clinton/Elm Ranchos Subdivision Phase II. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of the costs to maintain the landscaped areas.
There are 10 single-family residential lots within the Clinton/Elm Ranchos Subdivision Phase II, in Zone 15B. Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each residential lot within said Phase II.
ZONE 15C – Clinton/Elm Ranchos, Phase III
A condition of approval of plans for Clinton/Elm Ranchos Phase III was maintenance of the landscaped planter strip along the southeasterly side of Clinton Avenue from Fig Avenue to Elm Avenue. It is incumbent upon the property owners within the boundaries of the subdivision to account for their fair share of the costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 11 residential lots within Clinton/Elm Ranchos, Phase III.
ZONE 16 – Sugar Pine Estates
Conditions of approval of the Sugar Pine Estates subdivision required landscaping of the following areas:
1. Outlots “A” and “B” along the southwesterly side of Lilly Street between the Main Canal No. 1 and Sawmill Street;
2. Planter strip on the southwest side of Lilly Street adjacent to lots 1 through 4 inclusive, of said subdivision, a distance of approximately 214 feet; and,
3. Planter strip on the northeasterly side of Adelaide Street, adjacent to lots 5 through 8 inclusive and adjacent to lot 9, a distance of about 240 feet.
All parcels within the subdivision are specifically benefited by the maintenance of the landscaped outlots and the planter strips. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 24 residential lots and Outlot “C” within Sugar Pine Estates.
ZONE 17A – Capistrano X, Phases I & II & TUSCAN VILLAGE A condition of approval of plans for Tuscan Village, required landscaped areas and an irrigation system in the park strip located along the west side of North Westberry Boulevard north of Ren way, adjacent to the east side said subdivision, a distance of 250 lineal feet. The above landscaping completes the park strip to be included in Zone of Benefit 17A.
A condition of map approval for Capistrano X, Phases I & II, required landscaped areas at the locations noted below.
1. median island and the park strip along the west side of Westberry Boulevard between a point located approximately 123 feet south of the centerline of Ren Way to a point located approximately 247 feet north of said centerline;
2. median island and park strip along the west side of Westberry Boulevard between a point located approximately 145 feet south of the centerline of Westgate Drive to a point located approximately 247 feet north of said centerline; and,
3. “Outlot A” along the east side of Kent Drive, an area 15 feet wide and 300 feet long, more or less.
There are 40 single-family residential lots in Phase I and 33 single-family residential lots in Phase II. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 73 residential lots within Capistrano X Phases I and II; and, the 25 lots in Tuscan Village derive a benefit from the landscaped median island in point located approximately 123 feet south of the centerline of Ren Way and a point located approximately 247 feet north of the centerline of Westgate Drive. Therefore, one-hundred percent of the maintenance costs for the above identified park strip and 50% of the maintenance costs of the above identified median island will be assessed against 98 lots now existing within Zone 17A.
ZONE 17B – Capistrano X Phase III
One of the conditions for approval of plans for the Capistrano X, Phase III, was maintenance of the landscaped park strip along the east side of Westberry Blvd and, the median island in Westberry Blvd., along a distance of about 530 feet. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. The park strip will be assessed at 100% and the median island will be assessed at 50% of the maintenance costs against all 32 single-family residential lots in the subdivision. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 32 residential lots within Capistrano X Phase III.
ZONE 17C – Capistrano X Phase IV
One of the conditions for approval of plans for the Capistrano X, Phase IV, was maintenance of the landscaped park strip along the east side of Westberry Blvd., and the median island in Westberry Blvd. along a distance of about 526 feet. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas.
The park strip will be assessed at 100% and the median island will be assessed at 50% of the maintenance costs against all 35 single-family residential lots in Capistrano X, Phase IV.
Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 35 residential lots within Capistrano X, Phase IV.
ZONE 17D – Capistrano XI Phase I
One of the conditions for approval of plans for the Capistrano XI Phase I was maintenance of the landscaped park strip along the east side of Westberry Blvd., and the median island in Westberry Blvd., improvements which exist along the west boundary of the Capistrano X, Phase III, subdivision, and measure about 530 lineal feet. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas.
The park strip will be assessed at 100% and the median island will be assessed at 50% of the maintenance costs against all 45 single-family residential lots in Capistrano XI Phase I.
Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 45 residential lots within Capistrano XI, Phase I.
ZONE 18 – Lincoln Place, Phase I, II & III
Conditions for approval of plans for Lincoln Place, Phase I, II, and III was maintenance of landscaped areas noted below:
1. Park strip along the west side of Westberry Blvd. and the median island in Westberry Blvd. between the north boundary of Phase II and the south boundary of Phase I, a distance of about 600 feet; and,
2. Park strip along the north side of Sunset Avenue between Liberty Lane and Westberry Blvd. a distance of about 580 feet; and,
3. Lot 55 (Outlot “A”) of Lincoln Place Phase I.
It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. The park strip will be assessed at 100% and the median island will be assessed at 50% of the maintenance costs against all residential lots in the subdivision. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 54 residential lots within Lincoln Place I, II & III.
ZONE 20A – La Jolla Estates Phase 1 and Bellava-Berk Homes Landscaping of certain areas was a condition of approval for the La Jolla Estates Phase 1 and Bellava-Berk Homes. Landscape areas are located on the east side of Merced Street, adjacent to lot 17, measuring about 110 lineal feet of park strip within La Jolla Estates. Property frontage north of Adell Street, along Merced Street; approximately 20 feet of landscaping south of Adell Street, along the Merced Street property frontage; and approximately 60 feet of landscaping west of Merced Street, along the Adell Street property frontage within the Bella-Berk Homes. It is therefore incumbent upon all property owners within the boundaries to account for their fair share of costs to maintain the landscaped area.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 17 single-family residential lots within La Jolla Estates Phase 1 and 14 lots of Bellava-Berk Homes.
ZONE 20B – La Jolla Estates Phase 2
One of the conditions for approval of plans for La Jolla Estates Phase 2 was maintenance of the landscaped park strip on the east side of Merced Street, adjacent to lots 22 and 23, measuring about 270 lineal feet. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped area.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 31 single-family residential lots within La Jolla Estates Phase
2. ZONE 20C – La Jolla Estates Phase 3
One of the conditions for approval of plans for La Jolla Estates Phase 3 was maintenance of the landscaped park strip on the east side of Merced Street, adjacent to lot 64, measuring about 100 lineal feet. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped area. Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 16 single-family residential lots within La Jolla Estates Phase 3.
ZONE 21A – Home Ranch Phase I
A condition of approval for Home Ranch Phase I was the maintenance of several landscaped areas:
1. the park strip along the south side of W. Cleveland and the median island in W. Cleveland from Westberry Boulevard to Glade Avenue;
2. the park strip on the east ad west sides of Westberry Blvd. And ½ of the median island in Westberry Blvd. From W. Cleveland to a point located 430 feet south, thereof; and,
3. the full median island in Westberry Blvd. Between a point located 430 feet south of W.
Cleveland and a point located 1,143 feet south of W. Cleveland.
It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 41 residential lots within Home Ranch Phase I.
ZONE 21B – Home Ranch Phase II
A condition of approval of the plans for Home Ranch Phase II was maintenance of the park strip along the east side of Westberry Blvd. And the median island in Westberry Blvd. Between a point located about 150 feet south of the centerline of West Fairway Avenue to a point located about 400 feet north of said centerline.
It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 72 residential lots within Home Ranch Phase II. Of these lots three (3) are assessed an addition 1/3 due to lot line adjustments and five (5) are assessed double for merged lots.
ZONE 21C - Home Ranch Phase III
A condition of approval of plans for Home Ranch Phase III, required landscape plants and an irrigation system in two park strips located on the east side and the west side of North Westberry Boulevard between the alignment of Hampton Drive to a point located approximately 535 feet north of the center line of Fairfield Way, also described as the west boundary of Home Ranch Phase III, a distance of about 1,215 lineal feet.
The landscaped park strips provide a zone of benefit to all parcels within the subdivision.
Therefore, one hundred percent of the maintenance costs for the above identified park strips will be equally shared by the original 86 single-family lots within Home Ranch Phase III.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the original 86 residential lots in Home Ranch Phase III, for a total of 86 unit assessments for residential property.
ZONE 21D – Home Ranch Phase IV and Melanie Meadows Phase I, II, and III, and Rancho Santa Fe
A condition of approval of Home Ranch Phase IV was the requirement of landscaping in the areas described below:
1. The park strip along the south side of W. Cleveland Avenue between N. Westberry Avenue and the west boundary of Home Ranch Phase IV, a distance of about 425 feet, more or less; and,
2. The park strip along the west side of Westberry Blvd. and the median island in N.
Westberry Blvd., between W. Cleveland and W. Fairway Avenue, a distance of about 1,2000 feet, more or less.
A condition of approval of Rancho Santa Fe was the requirement of landscaping in the areas described below:
1. The park strip along the south side of W. Cleveland Avenue adjacent to the subdivision limits resulting in an approximate distance of 4,087 square feet of landscape area,
2. The landscaping area within the median constructed on W. Cleveland Avenue adjacent to the subdivision limits
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 54 residential lots within Home Ranch Phase IV Subdivision, 54 lots of Melanie Meadows Phase I subdivision, 118 lots of Melanie Meadows Subdivision Phase II and III, and 182 lots of Rancho Santa Fe, for a total of 408 lots in zone 21D.
ZONE 23 – Elm Estates II
A condition of approval of the plans for Elm Estates II was maintenance of the park strip along the southeasterly side of Clinton Avenue adjacent to lot 1 of the subdivision, a distance of about 120 feet. It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped area. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 9 residential lots within Elm Estates II.
ZONE 24 – Vista del Sierra
A condition of approval was the requirement for landscaping and irrigation, including trees, along the park strip on the north side of Sunrise Avenue and frontage road island located along the west side of Lilly Avenue, and the temporary stormwater retention basin, all adjacent to the Vista del Sierra Subdivision frontage. Assessments for maintenance for the above improvements have been spread upon one unit of assessment per each of the forty-nine (49) lots (forty-eight residential lots and a temporary basin lot which has been determined to be equivalent to a singlefamily residential lot.) within the Vista del Sierra subdivision and the temporary basin lot.
ZONE 25C – Cottonwood Estates Phase III
A condition of approval of the tentative map for Cottonwood Estates Phase III, required participation in the maintenance of landscaping and irrigation systems located in three (3) park strips along the west side of N. Granada Drive Constructed by Cottonwood Estates Phase I, between a point located approximately 290 feet south of the centerline of West Cleveland Avenue to a point located approximately 2,109 feet south said Cleveland Avenue, a distance of approximately, 1,817 lineal feet. Three phases of Cottonwood estates have been approved to date, with identical requirements, to maintain the above described park strip along Granada Avenue.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 42 lots within the Cottonwood Estates Phase III Subdivision.
ZONE 25D – Cottonwood Estates Phase IV
A condition of approval of the tentative map for Cottonwood Estates Phase 4, required participation in the maintenance of landscaping and irrigation systems located in three (3) park strips along the west side of N. Granada Drive constructed by Cottonwood Estates Phase I, between a point located approximately 290 feet south of the centerline of West Cleveland Avenue to a point located approximately 2,109 feet south said Cleveland Avenue, a distance of approximately, 1,817 lineal feet. Three phases of Cottonwood Estates have been approved to date, with identical requirements, to maintain the above described park strip along Granada Avenue.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 39 residential lots within the Cottonwood Estates Phase 4 Subdivision.
ZONE 26 – Cordova Estates Phase I & II
A condition of approval of Cordova Estates Phase I & II was the requirement for landscaping the park strip along the westerly side of Raymond Road from a point located about 135 feet south of the centerline of Laguna Way to a point located about 450 feet north of the centerline of Laguna Way.
It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 50 residential lots in Cordova Estates Phase I, and the 28 residential lots in Cordova Estates Phase II, for a total of 78 lots in Zone 26.
ZONE 26B – Cordova Estates Phase III
A condition of approval of Cordova Estates Phase III was the requirement for landscaping and irrigation, including trees along the park strip on the west side of Raymond Road between the north and south boundary of the subdivision, and one-half of the landscaping and irrigation, including trees along the future median island in Raymond road between the north and south boundary of the subdivisions Cordova Estates Phases I, II and IV. All parcels within the subdivision are specifically benefited by the maintenance of the landscaped parkstrip.
It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the sixty-one (61) single-family residential lots within Cordova Estates, Phase III, within Zone 26B.
ZONE 26C – Cordova Estates Phase IV
A condition of approval of Cordova Estates Phase IV was the requirement for landscaping the park strip along the westerly side of Raymond Road from a point located about 135 feet south of the centerline of Laguna Way to a point located about 450 feet north of the centerline of Laguna Way.
It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. Assessments for maintenance of the above improvements have been spread based on one unit of assessment per each of the 52 residential lots within Cordova Estates Phase IV.
ZONE 26D – Oakwood Estates
A condition of approval of plans for Oakwood Estates, required participation in the maintenance of landscape plants and an irrigation system in the park strip located on the west side of North Raymond Road along the east boundary of the final subdivision maps for Cordova Estates Phase I and II, Map 03-S-02, and, Cordova Estates Phase IV, map 04-S-03, a distance of approximately 1,485 feet.
The landscaped park strip provides a zone of benefit to all parcels within the subdivision.
Therefore, one hundred percent of the maintenance costs for the above identified park strip will be equally shared by the single-family lots within Oakwood Estates, the residential lots in said Cordova Estates Phases I, II, IV, and, Cordova Estates Phase III, located west of Cordova Estates Phase IV.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 23 residential lots in Oakwood Estates for a total of 23 unit assessments for residential property.
ZONE 27 – Vineyard West I
A condition of approval of Vineyards West Phase I was the requirement for landscaping park strips on the north side of Sunset Avenue, between Caitlan Drive and Via Cerioni, a distance of about 400 feet, more or less, and between Via Cerioni and a point located 140 feet east of Via Cerioni.
It is therefore incumbent upon all property owners within the boundaries of the subdivision to account for their fair share of costs to maintain the landscaped areas. Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 46 residential lots and lot No. 47 which is well site No. 32, owned by the City, within the Vineyards West Phase I Subdivision.
ZONE 27B – Vineyards West Phase II
A condition of approval of Vineyards West Phase II was the requirement for landscaping the park strip on the north side of Sunset Avenue and Riverside Drive between the east and west boundary of the Subdivision, all adjacent to the Vineyards West Phase II subdivision. There are 44 singlefamily residential lots within Vineyards West Phase II subdivision. Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 44 residential lots within the Vineyards West Phase II Subdivision.
ZONE 28 – Capistrano XII & XIV
A condition of approval of Capistrano Phase XII was the requirement for landscaping three (3) park strips on the south side of Howard Road from a point located 130 feet east of St Tropez Drive, to a point located about 130 feet west of Makenna Drive a distance of approximately 657 lineal feet.
Several park strips located along the Westside of South Granada Drive from a point located 342 feet north of Plumas Avenue to a point 125 feet south of Industrial Avenue, a distance of approximately 1210 lineal feet.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 86 residential lots within Capistrano Phase XII and 60 residential lots within Capistrano Phase XIV.
ZONE 28B – Capistrano XIII
Landscaping of the park strip located along the west right of way of Granada Drive starting at a point located 110 feet south of Desert Ranch Way to Plumas Street along a distance of 570 feet was a condition of approval of the Tentative Map for Capistrano XIII subdivision.
There are 42 single-family residential lots within Capistrano XIII subdivision. Assessments for maintenance of the above improvements have been spread based upon unit of assessment per each residential lot.
ZONE 29 – Chateau at the Vineyards, Phase I/ La Spezia II and III A condition of approval of Chateau at the Vineyards Phase I and La Spezia I and II was the requirement for landscaping and irrigation, including trees in the areas below:
1. along West Almond Avenue, Stadium Road, and Gary Lane, all adjacent to the Chateau at the Vineyards Subdivision frontage
2. frontage along Almond Avenue, Stadium Road and Crown Terrace of La Spezia II and frontage along Stadium Road for La Spezia III.
Assessments for the above improvements have been spread based upon one unit of assessment per each of the seventy (70) single-family residential lots within the Chateau at the Vineyards Subdivision and a “Not a Part” (NAP) lot which has been determined to be equivalent to twentyfour (24) single-family residential lots. As well as 87 lots for La Spezia II and 28 for La Spezia III.
ZONE 29C – Chateau at the Vineyards, Phase III
A condition of approval of plans for Chateau at the Vineyards was participation in the maintenance of irrigated landscaped areas constructed by Chateau at the Vineyards phase I, including:
1. Two park strips along the south side of West Almond Avenue between South Stadium Road and a point located approximately 1,150 feet east of Stadium Road; and,
2. Two park strips along the east side of South Stadium Road between West Almond Avenue and a point located approximately 734 feet south of Almond Avenue.
Chateau at the Vineyards, Phase III was also required to install an irrigation system and landscaping park strip along the south side of West Almond Avenue between Monterey Avenue and a point located approximately 80 feet west of Monterey Avenue.
The landscaped park strips provide a zone of benefit to all of the 19 parcels within the Chateau at the Vineyards, Phase III. Therefore, one hundred percent of the maintenance costs for the above identified park strips will be equally shared between the four (4) phases identified in the tentative map for the Chateau at the Vineyards subdivision.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 19 residential lots in Chateau at the Vineyards.
ZONE 29D – Chateau at the Vineyards, Phase IV
A condition of approval of Chateau at the Vineyards Phase IV Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements installed in conjunction with all Chateau at the Vineyards phases:
1. Installation of shrubs, trees, groundcover and irrigation system on the south side of Almond Avenue between Stadium Road and Monterey Street, running approximately 1,275 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation system on the east side of Stadium Road, running approximately 1,275 feet between Almond Avenue and Gary Lane adjacent to the subdivision tract.
3. Installation of shrubs, trees, groundcover and irrigation system on the north side of Gary Lane, running approximately 1,275 feet between Stadium Road and Monterey Street adjacent to the subdivision tract.
Assessments for maintenance of the landscape improvements have been spread based upon one unit of assessment per each of the 35 residential lots planned for Chateau at the Vineyards Phase IV.
ZONE 29E – Chateau at the Vineyards East
A condition of approval of Chateau at the Vineyards East Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation system on the south side of Almond Avenue, between Stadium Road and Monterey Street and on the east side of Stadium Road between Almond Avenue and the future Gary Lane, adjacent to the subdivision Tract.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 24 residential lots within the Chateau at the Vineyards East subdivision.
ZONE 30 – Yosemite Estates
A condition of approval of Yosemite Estates was the requirement for landscaping the park strip on the north side of Almond Avenue from Monterey Avenue to a point located about 195 feet west of Monterey Avenue. There are thirty (30) single-family residential lots with the Yosemite Estates subdivision. Assessments for Maintenance for the above improvements have been spread based upon one unit of assessment per each of the thirty (30) residential lots within the Yosemite Estates Subdivision.
ZONE 31A – Highlands at Rancho Valencia Phase I
A condition of approval of the Tentative Map for Highlands at Rancho Valencia was a requirement for extensive landscaping with irrigation systems along park strips, within several mini-parks, within two traffic circles, and one median island in Sanders Avenue. The park strips are located on the south side of Pecan Roan and on the east side of Raymond Thomas Street. The total costs to maintain the landscape improvements will be shared equally between the 346 residential lots included in the tentative map for the Highlands at Rancho Valencia.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 94 residential lots included within the Highlands at Rancho Valencia Phase I subdivision.
ZONE 31B – Highlands at Rancho Valencia Phase II
A condition of approval of Highlands at Rancho Valencia Phase II was the requirement to participate in the maintenance of shrubs, trees, groundcover, and irrigation systems in the following locations:
1. The park strip located along the east side of Raymond Thomas Road between Parkwood Avenue and Hazel Avenue, along the west side of the subdivision;
2. The park strips, landscaped outlots, and traffic circles located in the South Valencia Avenue from the north boundary of the subdivision near Parkwood Avenue, to Georgia Avenue;
3. Outlots “F”, “H”, and “K”.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 247 residential lots within the Highlands at Rancho Valencia Phase II subdivision.
ZONE 32A – La Jolla North Phase I
A condition of approval of plans for La Jolla North subdivision Phase I, required landscape plants and an irrigation system in two park strips located on:
1. The east side of Merced Street between East Carmen and East Ellis Street, and
2. The south side of Ellis Street adjacent to lots 32 through 46 of Phase I, inclusive, a distance of about 1,000 feet.
The landscaped park strips provide a zone of benefit to all parcels within the subdivision.
Therefore, one hundred percent of the maintenance costs for the above-identified park strips will be equally shared by the single-family lots within La Jolla North subdivision Phase I.
Assessments for maintenance of the above improvements have been spread based upon one unit of the assessment per each of the 46 residential lots in La Jolla North subdivision Phase I, for a total of 46 unit assessments for residential property.
ZONE 32B – La Jolla North Phase II
A condition of approval of plans for La Jolla North subdivision Phase II, required landscape plants and irrigation system in the park strip located on the south side of East Ellis Street adjacent to lost 47 through 61 of Phase II, inclusive, a distance of about 1,000 feet.
The landscaped park strip provides a zone of benefit to all parcels within the subdivision.
Therefore, one hundred percent of the maintenance costs for the above identified park strip will be equally shared by the single-family lots within the La Jolla North subdivision Phase II.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 47 residential lots in La Jolla North Subdivision Phase II, for a total of 47 unit assessment for residential property.
ZONE 33 – South Star Estates
A condition of approval of plans for South Star Estates was maintenance of plants and the irrigation system for two park strips located:
1. The north side of Pecan Avenue (Avenue 13) located between Hickory Avenue and Barnett Avenue, a distance of about 930 feet; and,
2. The west side of Barnett Street between Pecan Avenue and a point located about 120 feet north of the center line of Macadamia Avenue, a distance of approximately 610 feet.
All parcels within the subdivision are specifically benefited by the maintenance of the landscaped areas. Assessment for maintenance of the above landscaped areas has been spread based upon one unit of assessment per each of the 61 family residential lots within South Star Estates.
ZONE 34 – Kennedy Estates Phase I & II
A Condition of approval of plans for the tentative map of Kennedy Estates, required landscape plants and an irrigation system in the park strips located:
1. along the west side of North Chapin Avenue from Kennedy Avenue, to a point located about 860 lineal feet north of Kennedy Avenue; and
2. along the north side of Kennedy Avenue from the westerly boundary of the Kennedy Estates to Chapin Avenue, a distance of about 1,025 lineal feet.
The landscaped park strip provides a zone of benefit to all of the 101 parcels within the Phase I & II of Kennedy Estates. Therefore, one hundred percent of the maintenance costs for the above identified park strips will be equally shared by the 101 single-family lots within the subdivision.
Assessments for maintenance of the above improvements have been spread based upon one unit of assessment per each of the 101 residential lots in Kennedy Estates Phase I & II, for a total of 101 unit assessments for residential property.
ZONE 34B – Kennedy Estates Phase 3
A condition of approval of Kennedy Estates Phase 3 Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. along the west side of North Chapin Avenue from Ellis Street, to a point located about 860 lineal feet south of Ellis Street; and
2. along the south side of Ellis Street from the westerly boundary of the Kennedy Estates Phase 3 Subdivision to Chapin Avenue, a distance of about 1,025 lineal feet Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 52 residential lots within the Kennedy Estates Phase 3 Subdivision.
ZONE 34C – Kennedy Estates Phase 4
A condition of approval of Kennedy Estates Phase 4 Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. along the west side of North Chapin Avenue from Ellis Street, to a point located about 860 lineal feet south of Ellis Street; and
2. along the south side of Ellis Street from the westerly boundary of Kennedy Estates Phase 3 Subdivision to Chapin Avenue, a distance of about 1,025 lineal feet Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 51 residential lots within the Kennedy Estates Phase 4 Subdivision.
ZONE 35 – Santa Barbara Estates
A condition of approval of Santa Barbara Estates was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation on the north side of Howard Road, running 660 feet adjacent to the subdivision tract.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 90 residential lots within the Santa Barbara Estates Subdivision.
ZONE 36A – Mariposa Estates
A condition of approval of Mariposa Estates Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
Landscaping and irrigation, including trees along the park strip on the north side of East Olive Avenue 558 feet west starting from Tozer Street and ending at the east side of Mariposa Street, then starting the west side of Mariposa Street continuing west along the north side of east Olive Avenue 550 feet and ending at Knox Street.
Landscaping and irrigation, including trees along the park strip on the west side of Tozer Street 507 feet north starting at East Olive Avenue and ending at the south side of Trail Way, then starting at the north side of Trail Way continuing north along the west side of Tozer Street 594 feet and ending at A Street.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 140 residential lots within the Mariposa Estates Subdivision.
ZONE 36B – Mariposa Estates Phase II
Landscaping and irrigation, including trees along the park strip on the north side of East Olive Avenue 558 feet west starting from Tozer Street and ending at the east side of Mariposa Street, then starting the west side of Mariposa Street continuing west along the north side of east Olive Avenue 550 feet and ending at Knox Street.
Landscaping and irrigation, including trees along the park strip on the west side of Tozer Street 507 feet north starting at East Olive Avenue and ending at the south side of Trail Way, then starting at the north side of Trail Way continuing north along the west side of Tozer Street 594 feet and ending at A Street.
All parcels within the subdivision are specifically benefited by the maintenance of the landscaped park strip. Mariposa Estates, Phase II totals 10 lots equaling 10 units.
ZONE 36C – Olive Estates
A condition of approval of Olive Estates Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Landscaping and irrigation, including trees along the park strip on the north side of East Olive Avenue 590 feet west starting at Knox Street and ending at the westerly subdivision boundary.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 46 residential lots within the Olive Estates Subdivision.
Zone 37 – Almond Tree Estates
A condition of approval of Almond Tree Estates was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Landscaping and irrigation, including trees along the park strip on the South side of West Almond Avenue, along the frontage of the subdivision, approximately 660 feet.
All parcels within the subdivision are specifically benefited by the maintenance of the landscaped park strip. Almond Tree Estates totals 100 lots equaling 100 units.
ZONE 39 – Carmel Homes III and Varbella
A condition of approval of Carmel Homes III was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation on the East side of Stadium Road, running 620 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation on the South side of Pecan Ave, running 310 feet adjacent to the subdivision tract.
3. Installation of shrubs, trees, groundcover and irrigation on the Median on Pecan Ave, running 220 feet adjacent to the subdivision tract.
A condition of approval of Varbella Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation on the South side of Gary Lane, running approximately 1,000 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation on the East side of Stadium Road, running approximately 525 feet adjacent to the subdivision tract.
3. Installation of shrubs, trees, groundcover and irrigation on the Median on Pecan Ave, running 220 feet adjacent to the subdivision tract.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 82 residential lots within the Carmel Homes III Subdivision and 79 residential lots in the Varbella Subdivision.
ZONE 40 – Tierra Vista Estates
A condition of approval of Tierra Vista Estates Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation system on the north side of Gary Lane, running approximately 780 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation system on the west side of Emily Lane, running approximately 240 feet adjacent to the subdivision tract.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 78 residential lots within the Tierra Vista Estates Subdivision.
ZONE 41 – Pond Place Estates
A condition of approval of Pond Place Estates Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
Landscaping and irrigation, including trees, along the park strip on the west side of Stadium Road starting from the northern boundary of the subdivision, heading south approximately 140 feet, and ending at El Monte Avenue.
Landscaping and irrigation, including trees, on the frontage road island on the west side of Stadium Road starting from El Monte Avenue, heading south approximately 320 feet, and ending at Gamay Avenue.
Landscaping and irrigation, including trees, along the park strip on the west side of Stadium Road starting from Gamay Avenue, heading south approximately 120 feet, and ending at the southern boundary of the subdivision.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 29 residential lots within the Pond Place Estates Subdivision.
ZONE 43A – Orchard Point Estates Phase I & II, Brawley Subdivision A condition of approval of Orchard Pointe Estates Phase I & II Subdivision and the Brawley Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation system on the west side of Tozer Street 2290 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees groundcover and irrigation system in the median island of Tozer Street,, running approximately 1960 feet adjacent to the subdivision tract.
3. Installation of shrubs, groundcover and irrigation system on Knox Street, running approximately 980 feet adjacent to the subdivision tract on the east side of the street.
4. Installation of shrubs, trees, groundcover and irrigation system on Knox Street, running approximately 2790 feet adjacent to the subdivision tract on the west side of the of the street.
5. Installation of shrubs, trees, groundcover and irrigation system on Nectarine Street, running approximately 500 feet adjacent to the subdivision tract on the south side of the street and 140 feet on the north street.
6. 14,540 square feet of landscape and hardscape material and playground equipment.
Assessments for maintenance of the landscape improvements have been spread based upon one unit of assessments per each of the 306 residential lots, and an appropriate pro-rated share based on lot area for two (2) commercial lots, included in the tentative map for Orchard Pointe Phases I & II and for the Brawley Subdivision.
ZONE 43C – El Coronado Estates
A condition of approval of El Coronado Estates Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation system within the median of Tozer Street running approximately 1,680 feet between East Olive Avenue and the southern edge of subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation system on the west side of Tozer Street, running approximately 1,000 feet adjacent to the subdivision tract.
3. Installation of shrubs, trees, groundcover and irrigation system within the median of East Olive Avenue running approximately 1,270 feet between Tozer Street and Knox Street.
4. Installation of shrubs, trees, groundcover and irrigation system on the south side of East Olive Avenue running approximately 870 feet adjacent to the subdivision tract.
5. Installation of shrubs, trees, groundcover and irrigation system on the east side of Knox Street running approximately 900 feet adjacent to the subdivision tract.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 206 residential lots within the El Coronado Estates Subdivision.
ZONE 43D – Almond Village Estates
A condition of approval of Almond Village Estates Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation system on the south side of East Olive Avenue, running 615 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover, and irrigation system in the median island of East Olive Avenue, beginning at the west limits of the subdivision tract and running approximately 235 feet adjacent to the subdivision tract.
3. Installation of shrubs, trees, groundcover and irrigation system on the west side of Knox Road, running 1,060 feet adjacent to the subdivision tract between East Olive Avenue and Los Arcos Lane.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 104 residential lots within the Almond Village Estates Subdivision.
ZONE 43E – Taylor Estates
A condition of approval of Taylor Estates Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, groundcover and irrigation system on the south side of Olive Avenue running approximately 430 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation system in the median island of Olive Avenue, running approximately 430 feet adjacent to the subdivision tract.
Assessments for maintenance of the landscape improvements have been spread based upon one unit of assessment per each of the 20 residential lots included in the tentative map ZONE 44 – Sierra Vista Estates Phase III
A condition of approval of Sierra Vista Estates Phase III was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation on the east side of Don Miguel Street, running 410 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation on the north side of Olive Ave, running 130 feet adjacent to the subdivision tract
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 9 residential lots within the Sierra Vista Estates III Subdivision.
ZONE 45A – Sienna Estates Phase 1
A condition of approval of Sienna Estates Phase 1 Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation system on the south side of East Yosemite Avenue, running approximately 1,050 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation system on the north side of Storey Road, running approximately 850 feet adjacent to the subdivision tract.
3. Installation of shrubs, groundcover and irrigation system on Emerald Way, running approximately 110 feet within the subdivision tract on the both sides of the street.
4. Installation of shrubs, groundcover and irrigation system on Crimson Way, running approximately 110 feet within the subdivision tract on the both sides of the street.
Assessments for maintenance of the landscape improvements have been spread based upon one unit of assessment per each of the 138 residential lots planned for Sienna Estates in Phases 1 and 2.
ZONE 46 – Capistrano XVII
A condition of approval of the Capistrano XVII Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for South Granada Drive, Almond Avenue and Outlot A of the Final Map. Specific limits and improvements within street frontages are identified as follows:
1. Installation of shrubs, trees, groundcover and irrigation system on the West side South Granada Drive, running approximately 1,285 feet adjacent to the subdivision tract.
2. Installation of shrubs, trees, groundcover and irrigation system on the South side of West Almond Avenue, running approximately 640 feet adjacent to the subdivision tract.
Assessments for maintenance of the landscape improvements have been spread based upon one unit of assessment per each of the 102 residential lots included in the tentative map for Capistrano XVII.
ZONE 50 – Sugar Pine Village
A condition of approval of Sugar Pine Village Subdivision was the requirement to participate in the maintenance of landscaping and the irrigation system for the following improvements:
1. Installation of shrubs, trees, groundcover and irrigation system on the north side of Clinton Street, running approximately 240 feet in length, adjacent to the subdivision.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per each of the 25 residential lots within the Sugar Pine Village Subdivision.
ZONE 51 – Red Rock Retail Center, et al
All landscaping associated with previously approved developments as depicted in their respective landscape improvement plans on file in the City of Madera Engineering Department and as referenced below:
All landscaping associated with previously approved developments as depicted in their respective landscape improvement plans on file in the City of Madera Engineering Department and as referenced below:
Redrock Retail Center
Will Gill Industrial Subdivision (Median Island Improvements Constructed under City Contract on Pine and Pecan Avenues)
Old Mervyns Building 29
Tractor Supply
Capistrano 16 Subdivision
Love’s Travel Center
Riverwalk Subdivision
Veteran’s Housing
Burger King, Madera Ave
Madera County Public Health
Starbucks, Bethard Square
Nassar Medical
Hammel Medical Office, E. Almond Ave
Crown Tozer Subdivision
Lake & Adell Subdivision
Boston Motors
The Tint Shop
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per square foot of land for each of the 39 commercial lots and 270 residential lots.
Assessments for maintenance for the above improvements have been spread based upon one unit of assessment per square foot of land for each of the 39 commercial lots and 268 residential lots.
INCIDENTAL COSTS
Assessments for the Administrative, Legal, Mailing, and Processing Fees for each lot or parcel are spread in the same manner as the maintenance costs for the zone in which it is located.
Exhibit ‘C’
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
2024-2025 ASSESSMENT
COSTS PER ZONE / ASSESSMENT ROLLS
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10-D, 10-E, 10-F, 10-G, 10- H,10-I, 12, 13, 14, 15, 15-B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-D, 26, 26-B, 26-C,26- D, 27, 27-B, 28, 28-B, 29, 29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37, 39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46, 50 & 51
1. BEGINNING FUND BALANCE $ 421.09
2. LANDSCAPE MAINTENANCE COSTS $ 5,995.39
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 361.05
b. ENGINEERING ADMINISTRATION $ 185.42
c. LEGAL ADMINISTRATION $ 39.57
d. FINANCE ADMINISTRATION $ 27.51
e. TREE TRIMMING $ 338.00
f. GAS & UTILITIES $ 325.47
g. EQUIPMENT g. 338.46
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 62.09
i. MADERA COUNTY PROCESSING FEES $ 51.92
TOTAL COSTS: $ 7,724.88
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (1,253.80)
5. TOTAL ASSESSMENT $ 6,050.00
6. AVERAGE ASSESSMENT PER PARCEL 102.54
CITY OF MADERA
ZONE 1
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 013-010-031-000 $76.69 39 013-012-022-000 $31.23
2 013-010-095-000 $1,447.20 40 013-012-023-000 $36.59
3 013-010-096-000 $686.53 41 013-012-024-000 $37.08
4 013-012-019-000 $40.97 42 013-012-014-000 $13.70
5 013-012-030-000 $13.46 43 013-012-015-000 $13.70
6 013-012-025-000 $165.19 44 013-012-016-000 $13.69
7 013-012-008-000 $29.31 45 013-012-026-000 $55.38
8 013-012-009-000 $27.54 46 013-012-027-000 $30.60
9 013-012-010-000 $67.94 47 013-012-028-000 $30.78
10 013-012-013-000 $18.69 48 013-012-029-000 $19.79
11 013-012-011-000 $38.05 49 013-011-005-000 $42.92
12 013-012-012-000 $43.57 50 013-011-011-000 $34.62
13 013-012-017-000 $185.34 51 013-011-004-000 $10.96
14 013-012-018-000 $62.72 14 013-012-018-000 $0.00
15 013-010-070-000 $208.24 15 013-010-070-000 $0.00
16 013-012-007-000 $407.64 54 013-011-008-000 $8.36
17 013-012-006-000 $42.12 55 013-011-014-000 $5.71
18 013-012-005-000 $137.95 56 013-011-002-000 $6.41
19 013-012-004-000 $89.32 57 013-011-013-000 $7.89
20 013-012-036-000 $57.60 58 013-011-012-000 $52.44
21 013-012-038-000 $36.60 59 013-050-006-000 $293.48
22 013-012-039-000 $32.07 60 013-050-011-000 $47.02
23 013-012-040-000 $37.48
24 013-012-041-000 $44.47 Total to County $5,269.41
Amount to be billed via A/R $753.07
25 013-012-001-000 $20.24
26 013-012-002-000 $284.30
28 013-012-031-000 $19.72
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 1 - AIRPORT BUSINESS PARK
TOTAL ASSESSMENT:
$6,050.00
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
29 013-012-035-000 $4.72
30 013-010-054-000 $27.39
31 013-010-073-000 $457.16
32 013-010-076-000 $58.24
33 013-010-075-000 $180.06
34 013-010-076-000 $58.24
35 013-012-032-000 $19.72
36 013-012-033-000 $19.72
37 013-012-020-000 $40.63
38 013-012-021-000 $43.30
1. BEGINNING FUND BALANCE $ $24,498.98
2. LANDSCAPE MAINTENANCE COSTS $ 32,493.32
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 712.31
b. ENGINEERING ADMINISTRATION $ 899.55
c. LEGAL ADMINISTRATION $ 191.95
d. FINANCE ADMINISTRATION $ 133.45
e. TREE TRIMMING $ 2,880.00
f. GAS & UTILITIES $ 2,524.44
g. EQUIPMENT g. 1,689.30
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 120.53
i. MADERA COUNTY PROCESSING FEES $ 282.48
TOTAL COSTS: $ 41,927.35
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 14,554.50
5. TOTAL ASSESSMENT $ 31,982.86
6. AVERAGE ASSESSMENT PER PARCEL 99.64
CITY OF MADERA
ZONE 2
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 013-070-012-000 $1,765.32 36 013-090-031-000 $35.32
2 013-070-014-000 $541.62 37 013-090-032-000 $35.32
3 38 013-090-033-000 $35.32
4 013-070-020-000 $748.50 39 013-090-034-000 $35.32
5 013-070-023-000 $266.44 40 013-090-035-000 $35.32
6 013-070-025-000 $3,177.08 41 013-090-036-000 $35.32
7 013-070-026-000 $188.66 42 013-090-037-000 $35.32
8 013-070-027-000 $156.00 43 013-090-038-000 $35.32
9 013-070-028-000 $133.32 44 013-090-039-000 $35.32
10 013-090-005-000 $35.32 45 013-090-040-000 $35.32
11 013-090-006-000 $35.32 46 013-090-041-000 $35.32
12 013-090-007-000 $35.32 47 013-090-042-000 $35.32
13 013-090-008-000 $35.32 48 013-091-001-000 $35.32
14 013-090-009-000 $35.32 49 013-091-002-000 $35.32
15 013-090-010-000 $35.32 50 013-091-003-000 $35.32
16 013-090-011-000 $35.32 51 013-091-004-000 $35.32
17 013-090-012-000 $35.32 52 013-091-005-000 $35.32
18 013-090-013-000 $35.32 53 013-091-006-000 $35.32
19 013-090-014-000 $35.32 54 013-091-007-000 $35.32
20 013-090-015-000 $35.32 55 013-091-008-000 $35.32
21 013-090-016-000 $35.32 56 013-091-009-000 $35.32
22 013-090-017-000 $35.32 57 013-091-010-000 $35.32
23 013-090-018-000 $35.32 58 013-091-011-000 $35.32
24 013-090-019-000 $35.32 59 013-091-012-000 $35.32
25 013-090-020-000 $35.32 60 013-091-013-000 $35.32
26 013-090-021-000 $35.32 61 013-091-014-000 $35.32
27 013-090-022-000 $35.32 62 013-091-015-000 $35.32
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 2 - PHEASANT RUN/NORTHWEST ESTATES
TOTAL ASSESSMENT:
$31,982.86
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 013-090-023-000 $35.32 63 013-091-016-000 $35.32
29 013-090-024-000 $35.32 64 013-091-017-000 $35.32
30 013-090-025-000 $35.32 65 013-091-018-000 $35.32
31 013-090-026-000 $35.32 66 013-091-019-000 $35.32
32 013-090-027-000 $35.32 67 013-091-020-000 $35.32
33 013-090-028-000 $35.32 68 013-091-021-000 $35.32
34 013-090-029-000 $35.32 69 013-091-022-000 $35.32
35 013-090-030-000 $35.32 70 013-091-023-000 $35.32
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 013-091-024-000 $35.32 116 013-091-069-000 $35.32
72 013-091-025-000 $35.32 117 013-091-070-000 $35.32
73 013-091-026-000 $35.32 118 013-091-071-000 $35.32
74 013-091-027-000 $35.32 119 013-091-072-000 $35.32
75 013-091-028-000 $35.32 120 013-091-073-000 $35.32
76 013-091-029-000 $35.32 121 013-091-074-000 $35.32
77 013-091-030-000 $35.32 122 013-091-075-000 $35.32
78 013-091-031-000 $35.32 123 013-091-076-000 $35.32
79 013-091-032-000 $35.32 124 013-091-077-000 $35.32
80 013-091-033-000 $35.32 125 013-130-002-000 $35.32
81 013-091-034-000 $35.32 126 013-130-003-000 $35.32
82 013-091-035-000 $35.32 127 013-130-004-000 $35.32
83 013-091-036-000 $35.32 128 013-130-005-000 $35.32
84 013-091-037-000 $35.32 129 013-130-006-000 $35.32
85 013-091-038-000 $35.32 130 013-130-007-000 $35.32
86 013-091-039-000 $35.32 131 013-130-008-000 $35.32
87 013-091-040-000 $35.32 132 013-130-009-000 $35.32
88 013-091-041-000 $35.32 133 013-130-010-000 $35.32
89 013-091-042-000 $35.32 134 013-130-011-000 $35.32
90 013-091-043-000 $35.32 135 013-130-012-000 $35.32
91 013-091-044-000 $35.32 136 013-130-013-000 $35.32
92 013-091-045-000 $35.32 137 013-130-014-000 $35.32
93 013-091-046-000 $35.32 138 013-130-015-000 $35.32
94 013-091-047-000 $35.32 139 013-130-016-000 $35.32
95 013-091-048-000 $35.32 140 013-130-017-000 $35.32
96 013-091-049-000 $35.32 141 013-130-018-000 $35.32
97 013-091-050-000 $35.32 142 013-130-019-000 $35.32
98 013-091-051-000 $35.32 143 013-130-020-000 $35.32
99 013-091-052-000 $35.32 144 013-130-021-000 $35.32
100 013-091-053-000 $35.32 145 013-130-022-000 $35.32
101 013-091-054-000 $35.32 146 013-130-023-000 $35.32
102 013-091-055-000 $35.32 147 013-130-024-000 $35.32
103 013-091-056-000 $35.32 148 013-130-025-000 $35.32
104 013-091-057-000 $35.32 149 013-130-026-000 $35.32
105 013-091-058-000 $35.32 150 013-130-027-000 $35.32
106 013-091-059-000 $35.32 151 013-130-028-000 $35.32
107 013-091-060-000 $35.32 152 013-130-029-000 $35.32
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
108 013-091-061-000 $35.32 153 013-130-030-000 $35.32
109 013-091-062-000 $35.32 154 013-130-031-000 $35.32
110 013-091-063-000 $35.32 155 013-130-032-000 $35.32
111 013-091-064-000 $35.32 156 013-130-033-000 $35.32
112 013-091-065-000 $35.32 157 013-130-034-000 $35.32
113 013-091-066-000 $35.32 158 013-130-035-000 $35.32
114 013-091-067-000 $35.32 159 013-130-036-000 $35.32
115 013-091-068-000 $35.32 160 013-130-037-000 $35.32
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
161 013-130-038-000 $35.32 206 013-140-014-000 $35.32
162 013-130-039-000 $35.32 207 013-140-015-000 $35.32
163 013-130-040-000 $35.32 208 013-140-016-000 $35.32
164 013-130-041-000 $35.32 209 013-140-017-000 $35.32
165 013-130-042-000 $35.32 210 013-140-018-000 $35.32
166 013-130-043-000 $35.32 211 013-140-019-000 $35.32
167 013-130-044-000 $35.32 212 013-140-020-000 $35.32
168 013-130-045-000 $35.32 213 013-140-021-000 $35.32
169 013-130-046-000 $35.32 214 013-140-022-000 $35.32
170 013-130-047-000 $35.32 215 013-140-023-000 $35.32
171 013-130-048-000 $35.32 216 013-140-024-000 $35.32
172 013-130-049-000 $35.32 217 013-140-025-000 $35.32
173 013-130-050-000 $35.32 218 013-140-026-000 $35.32
174 013-130-051-000 $35.32 219 013-140-027-000 $35.32
175 013-130-052-000 $35.32 220 013-140-028-000 $35.32
176 013-130-053-000 $35.32 221 013-140-037-000 $42.36
177 013-130-054-000 $35.32 222 013-140-038-000 $63.58
178 013-130-055-000 $35.32 223 013-140-039-000 $42.36
179 013-130-056-000 $35.32 224 013-141-005-000 $155.34
180 013-130-057-000 $35.32 225 013-140-058-000 $49.44
181 013-130-058-000 $35.32 226 013-140-053-000 $159.94
182 013-130-059-000 $35.32 237 013-150-003-000 $35.32
183 013-131-001-000 $35.32 238 013-150-004-000 $35.32
184 013-131-002-000 $35.32 239 013-150-005-000 $35.32
185 013-131-003-000 $35.32 240 013-150-006-000 $35.32
186 013-131-004-000 $35.32 241 013-150-007-000 $35.32
187 013-131-005-000 $35.32 242 013-150-008-000 $35.32
188 013-131-006-000 $35.32 243 013-150-009-000 $35.32
189 013-131-007-000 $35.32 244 013-150-010-000 $35.32
190 013-131-008-000 $35.32 245 013-150-011-000 $35.32
191 013-131-009-000 $35.32 246 013-150-012-000 $35.32
192 013-131-010-000 $35.32 247 013-150-013-000 $35.32
193 013-140-001-000 $35.32 248 013-150-014-000 $35.32
194 013-140-002-000 $35.32 249 013-150-015-000 $35.32
195 013-140-003-000 $35.32 250 013-150-016-000 $35.32
196 013-140-004-000 $35.32 251 013-150-017-000 $35.32
197 013-140-005-000 $35.32 252 013-151-001-000 $35.32
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
198 013-140-006-000 $35.32 253 013-151-002-000 $35.32
199 013-140-007-000 $35.32 254 013-151-003-000 $35.32
200 013-140-008-000 $35.32 255 013-151-004-000 $35.32
201 013-140-009-000 $35.32 256 013-151-005-000 $35.32
202 013-140-010-000 $35.32 257 013-151-006-000 $35.32
203 013-140-011-000 $35.32 258 013-151-007-000 $35.32
204 013-140-012-000 $35.32 259 013-151-008-000 $35.32
205 013-140-013-000 $35.32 260 013-151-009-000 $35.32
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
261 013-151-010-000 $35.32 301 013-160-015-000 $190.68
262 013-151-011-000 $35.32 302 013-160-016-000 $3,415.54 263 013-151-012-000 $35.32 303 013-160-019-000 $60.06
264 013-151-013-000 $35.32 304 013-160-020-000 $42.58
265 013-151-014-000 $35.32 305 013-160-021-000 $397.20
266 013-151-015-000 $35.32 306 013-160-022-000 $189.90
267 013-151-016-000 $35.32 307 013-160-023-000 $177.42
268 013-151-017-000 $35.32 308 013-160-025-000 $70.00
269 013-151-018-000 $35.32 309 013-160-024-000 $217.38
270 013-151-019-000 $35.32 310 013-160-026-000 $2,437.52 271 013-151-020-000 $35.32 311 013-160-017-000 $113.52
272 013-151-021-000 $35.32 312 013-160-018-000 $72.58
273 013-151-022-000 $35.32 313 013-110-032-000 $0.00
274 013-151-023-000 $35.32 314 013-110-007-000 $0.00
275 013-151-024-000 $35.32 315 013-110-023-000 $0.00
276 013-151-025-000 $35.32 316 013-110-024-000 $0.00
277 013-151-026-000 $35.32 317 013-110-010-000 $0.00
278 013-151-027-000 $35.32 319 013-141-006-000 $63.58
279 013-151-034-000 $171.96 320 013-141-027-000 $127.10 280 013-151-035-000 $240.12 321 013-141-036-000 $51.90
281 013-152-001-000 $35.32 322
282 013-152-002-000 $35.32 323 013-141-031-000 $54.40
283 013-152-003-000 $35.32 324 013-141-034-000 $124.64
284 013-152-004-000 $35.32 325 013-141-035-000 $54.36
285 013-152-005-000 $35.32 326 013-141-023-000 $75.20
286 013-152-006-000 $35.32 327 013-141-010-000 $35.32
287 013-152-007-000 $35.32 328 013-141-029-000 $211.84
288 013-152-008-000 $35.32
289 013-152-009-000 $35.32 329 013-141-032-000 $58.54
290 013-152-010-000 $35.32 330 013-141-033-000 $53.70
291 013-152-011-000 $35.32 331 013-070-046-000 $411.56
292 013-152-012-000 $35.32 332 013-070-047-000 $965.86
293 013-153-001-000 $35.32
294 013-153-002-000 $35.32
295 013-153-003-000 $35.32 TOTAL ASSESSMENT: $ 31,373.74 DIRECT BILL:
296 013-153-004-000 $35.32 TOTAL TO COUNTY: $ 31,373.74 297 013-153-005-000 $35.32
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
298 013-160-005-000 $1,177.12
299 013-160-013-000 $190.68
300 013-160-014-000 $2,895.12
* - Weren't on the list of apn's when the zone
was started in 1998.
1. BEGINNING FUND BALANCE $ (507.03)
2. LANDSCAPE MAINTENANCE COSTS $ 5,824.10
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 465.27
b. ENGINEERING ADMINISTRATION $ 490.70
c. LEGAL ADMINISTRATION $ 104.71
d. FINANCE ADMINISTRATION $ 72.80
e. TREE TRIMMING $ 2,475.00
f. GAS & UTILITIES $ 1,314.74
g. EQUIPMENT g. 531.87
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 0.00
i. MADERA COUNTY PROCESSING FEES $ 150.48
TOTAL COSTS: $ 11,429.66
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (4,229.79)
5. TOTAL ASSESSMENT $ 7,706.90
6. AVERAGE ASSESSMENT PER PARCEL 45.07
CITY OF MADERA
ZONE 3
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-390-011-000 $1,336.78 37 006-420-025-000 $24.32
2 006-390-013-000 $72.92 38 006-420-026-000 $24.32
3 006-390-014-000 $72.92 39 006-420-027-000 $24.32
4 006-390-016-000 $1,142.34 40 006-420-028-000 $24.32
5 006-390-019-000 $48.62 41 006-420-029-000 $24.32
6 006-390-020-000 $48.62 42 006-420-030-000 $24.32
7 006-390-021-000 $121.54 43 006-420-031-000 $24.32
8 006-390-022-000 $145.54 44 006-420-032-000 $24.32
9 006-390-027-000 $437.52 45 006-420-033-000 $24.32
11 006-390-025-000 $148.56 46 006-420-034-000 $24.32
12 006-390-026-000 $240.34 47 006-420-035-000 $24.32
13 006-420-001-000 $24.32 48 006-420-036-000 $24.32
14 006-420-002-000 $24.32 49 006-420-037-000 $24.32
15 006-420-003-000 $24.32 50 006-420-038-000 $24.32
16 006-420-004-000 $24.32 51 006-420-039-000 $24.32
17 006-420-005-000 $24.32 52 006-420-040-000 $24.32
18 006-420-006-000 $24.32 53 006-420-041-000 $24.32
19 006-420-007-000 $24.32 54 006-420-042-000 $24.32
20 006-420-008-000 $24.32 55 006-420-043-000 $24.32
21 006-420-055-000 $24.32 56 006-420-044-000 $24.32
22 006-420-056-000 $24.32 57 006-420-045-000 $24.32
23 006-420-057-000 $24.32 58 006-420-046-000 $24.32
24 006-420-012-000 $24.32 59 006-420-047-000 $24.32
25 006-420-058-000 $24.32 60 006-420-048-000 $24.32
26 006-420-059-000 $24.32 61 006-420-049-000 $24.32
27 006-420-015-000 $24.32 62 006-420-050-000 $24.32
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$7,706.90
LANDSCAPE MAINTENANCE DISTRICT
ZONE 3
MANSIONETTE ESTATES 1, 2, & 3
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 006-420-016-000 $24.32 63 006-420-051-000 $24.32
29 006-420-017-000 $24.32 64 006-420-052-000 $24.32
30 006-420-018-000 $24.32 65 006-420-053-000 $24.32
31 006-420-019-000 $24.32 66 006-440-026-000 $24.32
32 006-420-020-000 $24.32 67 006-440-027-000 $24.32
33 006-420-021-000 $24.32 68 006-440-003-000 $24.32
34 006-420-022-000 $24.32 69 006-440-004-000 $24.32
35 006-420-023-000 $24.32 70 006-440-005-000 $24.32
36 006-420-024-000 $24.32 71 006-440-006-000 $24.32
72 006-440-007-000 $24.32 117 006-422-015-000 $24.32
73 006-440-008-000 $24.32 118 006-422-014-000 $24.32
74 006-440-009-000 $24.32 119 006-422-013-000 $24.32
75 006-440-010-000 $24.32 120 006-422-012-000 $24.32
76 006-440-011-000 $24.32 121 006-422-011-000 $24.32
77 006-441-001-000 $24.32 122 006-422-010-000 $24.32
78 006-441-002-000 $24.32 123 006-422-009-000 $24.32
79 006-440-021-000 $24.32 124 006-422-008-000 $24.32
80 006-440-020-000 $24.32 125 006-422-007-000 $24.32
81 006-440-019-000 $24.32 126 006-422-006-000 $24.32
82 006-440-025-000 $24.32 127 006-422-005-000 $24.32
83 006-440-024-000 $24.32 128 006-422-004-000 $24.32
84 006-440-015-000 $24.32 129 006-422-003-000 $24.32
85 006-440-014-000 $24.32 130 006-422-002-000 $24.32
86 006-440-013-000 $24.32 131 006-422-001-000 $24.32
87 006-440-012-000 $24.32 132 006-421-014-000 $24.32
88 006-441-014-000 $24.32 133 006-421-013-000 $24.32
89 006-441-013-000 $24.32 134 006-421-012-000 $24.32
90 006-441-012-000 $24.32 135 006-421-011-000 $24.32
91 006-441-011-000 $24.32 136 006-421-010-000 $24.32
92 006-441-010-000 $24.32 137 006-421-009-000 $24.32
93 006-441-009-000 $24.32 138 006-421-008-000 $24.32
94 006-441-008-000 $24.32 139 006-421-007-000 $24.32
95 006-441-007-000 $24.32 140 006-421-006-000 $24.32
96 006-441-006-000 $24.32 141 006-421-043-000 $24.32
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
97 006-441-005-000 $24.32 142 006-421-044-000 $24.32
98 006-441-004-000 $24.32 143 006-421-022-000 $24.32
99 006-441-003-000 $24.32 144 006-421-021-000 $24.32
100 006-422-032-000 $24.32 145 006-421-020-000 $24.32
101 006-422-031-000 $24.32 146 006-421-019-000 $24.32
102 006-422-030-000 $24.32 147 006-421-018-000 $24.32
103 006-422-029-000 $24.32 148 006-421-017-000 $24.32
104 006-422-028-000 $24.32 149 006-421-016-000 $24.32
105 006-422-027-000 $24.32 150 006-421-015-000 $24.32
106 006-422-026-000 $24.32 151 006-421-031-000 $24.32
107 006-422-025-000 $24.32 152 006-421-030-000 $24.32
108 006-422-024-000 $24.32 153 006-421-029-000 $24.32
109 006-422-023-000 $24.32 154 006-421-028-000 $24.32
110 006-422-022-000 $24.32 155 006-421-027-000 $24.32
111 006-422-021-000 $24.32 156 006-421-026-000 $24.32
112 006-422-020-000 $24.32 157 006-421-025-000 $24.32
113 006-422-019-000 $24.32 158 006-421-024-000 $24.32
114 006-422-018-000 $24.32 159 006-421-023-000 $24.32
115 006-422-017-000 $24.32 160 006-421-003-000 $24.32
116 006-422-016-000 $24.32 161 006-421-002-000 $24.32
162 006-421-001-000 $24.32
163 006-421-041-000 $24.32
164 006-421-040-000 $24.32
165 006-421-039-000 $24.32
166 006-421-038-000 $24.32
167 006-421-037-000 $24.32
168 006-421-036-000 $24.32
169 006-421-035-000 $24.32
170 006-421-034-000 $24.32
171 006-421-033-000 $24.32
172 006-421-032-000 $24.32
TOTAL $7,706.90
1. BEGINNING FUND BALANCE $ 9,690.70
2. LANDSCAPE MAINTENANCE COSTS $ 13,463.94
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 559.59
b. ENGINEERING ADMINISTRATION $ 760.54
c. LEGAL ADMINISTRATION $ 162.29
d. FINANCE ADMINISTRATION $ 112.83
e. TREE TRIMMING $ 3,555.00
f. GAS & UTILITIES $ 1,334.35
g. EQUIPMENT g. 566.71
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 203.33
i. MADERA COUNTY PROCESSING FEES $ 237.60
TOTAL COSTS: $ 20,956.19
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 6,368.16
5. TOTAL ASSESSMENT $ 17,633.64
6. AVERAGE ASSESSMENT PER PARCEL 65.31
CITY OF MADERA
ZONE 4
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-251-001-000 $56.52 31 006-251-055-000 $56.52
2 006-251-002-000 $56.52 32 006-251-054-000 $56.52
3 006-251-003-000 $56.52 33 006-251-053-000 $56.52
4 006-251-004-000 $56.52 34 006-251-052-000 $56.52
5 006-251-005-000 $56.52 35 006-251-051-000 $56.52
6 006-251-006-000 $56.52 36 006-251-050-000 $56.52
7 006-251-007-000 $56.52 37 006-251-049-000 $56.52
8 006-251-008-000 $56.52 38 006-251-048-000 $56.52
9 006-251-072-000 $56.52 39 006-251-047-000 $56.52
10 006-251-071-000 $56.52 40 006-251-046-000 $56.52
11 006-251-070-000 $56.52 41 006-251-045-000 $56.52
12 006-251-013-000 $56.52 42 006-251-044-000 $56.52
13 006-251-014-000 $56.52 43 006-251-043-000 $56.52
14 006-251-015-000 $56.52 44 006-251-042-000 $56.52
15 006-251-016-000 $56.52 45 006-251-041-000 $56.52
16 006-251-069-000 $56.52 46 006-251-040-000 $56.52
17 006-251-068-000 $56.52 47 006-251-039-000 $56.52
18 006-251-067-000 $56.52 48 006-251-038-000 $56.52
19 006-251-066-000 $56.52 49 006-251-037-000 $56.52
20 006-251-022-000 $56.52 50 006-251-036-000 $56.52
21 006-251-023-000 $56.52 51 006-251-035-000 $56.52
22 006-251-064-000 $56.52 52 006-251-034-000 $56.52
23 006-251-063-000 $56.52 53 006-251-033-000 $56.52
24 006-251-062-000 $56.52 54 006-251-032-000 $56.52
25 006-251-061-000 $56.52 55 006-251-031-000 $56.52
26 006-251-060-000 $56.52 56 006-251-030-000 $56.52
27 006-251-059-000 $56.52 57 006-251-029-000 $56.52
28 006-251-058-000 $56.52 58 006-251-073-000 $56.52
29 006-251-057-000 $56.52 60 006-251-026-000 $56.52
30 006-251-056-000 $56.52 61 006-251-025-000 $56.52
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 4
WESTGATE NORTHWEST 1 & 2
TOTAL ASSESSMENT:
$17,633.64
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
62 006-251-024-000 $56.52 102 006-252-005-000 $56.52
63 006-252-028-000 $56.52 103 006-252-004-000 $56.52
64 006-252-027-000 $56.52 104 006-252-003-000 $56.52
65 006-252-026-000 $56.52 105 006-252-002-000 $56.52
66 006-252-025-000 $56.52 106 006-252-001-000 $56.52
67 006-252-024-000 $56.52 107 006-253-057-000 $56.52
68 006-252-023-000 $56.52 108 006-253-056-000 $56.52
69 006-252-022-000 $56.52 109 006-253-055-000 $56.52
70 006-252-021-000 $56.52 110 006-253-054-000 $56.52
71 006-252-020-000 $56.52 111 006-253-053-000 $56.52
72 006-252-019-000 $56.52 112 006-253-052-000 $56.52
73 006-252-018-000 $56.52 113 006-253-051-000 $56.52
74 006-252-017-000 $56.52 114 006-253-050-000 $56.52
75 006-252-016-000 $56.52 115 006-253-049-000 $56.52
76 006-252-015-000 $56.52 116 006-253-048-000 $56.52
77 006-252-036-000 $56.52 117 006-253-047-000 $56.52
78 006-252-035-000 $56.52 118 006-253-046-000 $56.52
79 006-252-034-000 $56.52 119 006-253-045-000 $56.52
80 006-252-033-000 $56.52 120 006-255-018-000 $56.52
81 006-252-032-000 $56.52 121 006-255-017-000 $56.52
82 006-252-031-000 $56.52 122 006-255-016-000 $56.52
83 006-252-030-000 $56.52 123 006-255-015-000 $56.52
84 006-252-029-000 $56.52 124 006-255-014-000 $56.52
85 006-252-044-000 $56.52 125 006-255-013-000 $56.52
86 006-252-043-000 $56.52 126 006-255-012-000 $56.52
87 006-252-042-000 $56.52 127 006-255-011-000 $56.52
88 006-252-041-000 $56.52 128 006-255-063-000 $56.52
89 006-252-040-000 $56.52 129 006-255-062-000 $56.52
90 006-252-039-000 $56.52 130 006-255-055-000 $56.52
91 006-252-038-000 $56.52 131 006-255-054-000 $56.52
92 006-252-037-000 $56.52 132 006-255-005-000 $56.52
93 006-252-014-000 $56.52 133 006-255-004-000 $56.52
94 006-252-013-000 $56.52 134 006-255-061-000 $56.52
95 006-252-012-000 $56.52 135 006-254-049-000 $56.52
96 006-252-011-000 $56.52 136 006-254-024-000 $56.52
97 006-252-010-000 $56.52 137 006-254-023-000 $56.52
98 006-252-009-000 $56.52 138 006-254-022-000 $56.52
99 006-252-008-000 $56.52 139 006-254-059-000 $56.52
100 006-252-007-000 $56.52 140 006-254-069-000 $56.52
101 006-252-006-000 $56.52 141 006-254-068-000 $56.52
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
142 006-254-055-000 $56.52 183 006-255-035-000 $56.52
143 006-254-015-000 $56.52 184 006-255-034-000 $56.52
144 006-254-014-000 $56.52 185 006-254-042-000 $56.52
145 006-254-013-000 $56.52 186 006-254-041-000 $56.52
146 006-254-065-000 $56.52 187 006-254-040-000 $56.52
147 006-254-064-000 $56.52 188 006-254-039-000 $56.52
148 006-254-063-000 $56.52 189 006-254-038-000 $56.52
149 006-254-062-000 $56.52 190 006-254-047-000 $56.52
150 006-254-007-000 $56.52 191 006-254-046-000 $56.52
151 006-254-006-000 $56.52 192 006-254-045-000 $56.52
152 006-254-005-000 $56.52 193 006-254-044-000 $56.52
153 006-254-004-000 $56.52 194 006-254-043-000 $56.52
154 006-254-003-000 $56.52 195 006-255-033-000 $56.52
155 006-254-002-000 $56.52 196 006-255-032-000 $56.52
156 006-254-001-000 $56.52 197 006-255-031-000 $56.52
157 006-254-037-000 $56.52 198 006-255-030-000 $56.52
158 006-254-036-000 $56.52 199 006-255-071-000 $56.52
159 006-254-035-000 $56.52 200 006-255-070-000 $56.52
160 006-254-067-000 $56.52 201 006-255-069-000 $56.52
161 006-254-066-000 $56.52 202 006-255-025-000 $56.52
162 006-254-031-000 $56.52 203 006-255-060-000 $56.52
163 006-254-054-000 $56.52 204 006-255-059-000 $56.52
164 006-254-053-000 $56.52 205 006-255-058-000 $56.52
165 006-254-052-000 $56.52 206 006-255-020-000 $56.52
166 006-254-051-000 $56.52 207 006-255-019-000 $56.52
167 006-254-050-000 $56.52 208 006-253-044-000 $56.52
168 006-255-068-000 $56.52 209 006-253-043-000 $56.52
169 006-255-067-000 $56.52 210 006-253-042-000 $56.52
170 006-255-066-000 $56.52 211 006-253-041-000 $56.52
171 006-255-065-000 $56.52 212 006-253-040-000 $56.52
172 006-255-064-000 $56.52 213 006-253-039-000 $56.52
173 006-255-045-000 $56.52 214 006-253-038-000 $56.52
174 006-255-044-000 $56.52 215 006-253-037-000 $56.52
175 006-255-043-000 $56.52 216 006-253-036-000 $56.52
176 006-255-042-000 $56.52 217 006-253-034-000 $56.52
177 006-255-041-000 $56.52 218 006-253-033-000 $56.52
178 006-255-040-000 $56.52 219 006-253-032-000 $56.52
179 006-255-039-000 $56.52 220 006-253-031-000 $56.52
180 006-255-038-000 $56.52 221 006-253-030-000 $56.52
181 006-255-037-000 $56.52 222 006-253-029-000 $56.52
182 006-255-036-000 $56.52 223 006-253-028-000 $56.52
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
224 006-253-027-000 $56.52 261 $277.45
225 006-253-026-000 $56.52 262 $138.73
226 006-253-025-000 $56.52 263 $138.73
227 006-253-024-000 $56.52 264 $277.45
228 006-253-023-000 $56.52
229 006-253-022-000 $56.52 *DIRECT BILL: $282.59
230 006-253-021-000 $56.52 TOTAL TO COUNTY: $17,294.53
231 006-253-020-000 $56.52
232 006-253-019-000 $56.52
233 006-253-001-000 $56.52
234 006-253-002-000 $56.52
235 006-253-003-000 $56.52
236 006-253-004-000 $56.52
237 006-253-005-000 $56.52
238 006-253-059-000 $56.52
239 006-253-060-000 $56.52
240 006-253-008-000 $56.52
241 006-253-009-000 $56.52
242 006-253-010-000 $56.52
243 006-253-011-000 $56.52
244 006-253-012-000 $56.52
245 006-253-013-000 $56.52
246 006-253-014-000 $56.52
247 006-253-015-000 $56.52
248 006-253-016-000 $56.52
249 006-253-017-000 $56.52
250 006-253-018-000 $56.52
251 006-253-035-000 $56.52
252 006-360-043-000 $56.52 *
253 006-360-044-000 $56.52 *
254 006-360-045-000 $56.52 *
255 006-360-046-000 $56.52 *
256 006-360-047-000 $56.52 *
257
258
259
260
261
262
263
257 006-250-014-000 $1,639.02
258 $138.73
259 $277.45
260 $277.45
1. BEGINNING FUND BALANCE $ 9,857.14
2. LANDSCAPE MAINTENANCE COSTS $ 13,093.94
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 559.36
b. ENGINEERING ADMINISTRATION $ 324.43
c. LEGAL ADMINISTRATION $ 69.23
d. FINANCE ADMINISTRATION $ 48.13
e. TREE TRIMMING $ 1,305.00
f. GAS & UTILITIES $ 1,899.93
g. EQUIPMENT g. 739.17
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 204.54
i. MADERA COUNTY PROCESSING FEES $ 96.80
TOTAL COSTS: $ 18,340.53
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 5,422.35
5. TOTAL ASSESSMENT $ 13,905.74
6. AVERAGE ASSESSMENT PER PARCEL $ 126.42
CITY OF MADERA
ZONE 6A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-300-009-000 $126.42 36 009-400-034-000 $126.42
2 009-300-010-000 $126.42 37 009-400-035-000 $126.42
3 009-400-001-000 $126.42 38 009-400-036-000 $126.42
4 009-400-002-000 $126.42 39 009-421-001-000 $126.42
5 009-400-003-000 $126.42 40 009-421-002-000 $126.42
6 009-400-004-000 $126.42 41 009-421-003-000 $126.42
7 009-400-005-000 $126.42 42 009-421-004-000 $126.42
8 009-400-006-000 $126.42 43 009-421-005-000 $126.42
9 009-400-007-000 $126.42 44 009-421-006-000 $126.42
10 009-400-008-000 $126.42 45 009-421-007-000 $126.42
11 009-400-009-000 $126.42 46 009-421-008-000 $126.42
12 009-400-010-000 $126.42 47 009-421-009-000 $126.42
13 009-400-011-000 $126.42 48 009-421-010-000 $126.42
14 009-400-012-000 $126.42 49 009-421-011-000 $126.42
15 009-400-013-000 $126.42 50 009-421-012-000 $126.42
16 009-400-014-000 $126.42 51 009-421-013-000 $126.42
17 009-400-015-000 $126.42 52 009-421-014-000 $126.42
18 009-400-016-000 $126.42 53 009-421-015-000 $126.42
19 009-400-017-000 $126.42 54 009-421-016-000 $126.42
20 009-400-018-000 $126.42 55 009-421-017-000 $126.42
21 009-400-019-000 $126.42 56 009-421-018-000 $126.42
22 009-400-020-000 $126.42 57 009-421-019-000 $126.42
23 009-400-021-000 $126.42 58 009-421-020-000 $126.42
24 009-400-022-000 $126.42 59 009-421-021-000 $126.42
25 009-400-023-000 $126.42 60 009-421-022-000 $126.42
26 009-400-024-000 $126.42 61 009-421-023-000 $126.42
ZONE 6A
WOODLAND HILLS/BASILA
TOTAL ASSESSMENT:
$13,905.74
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 009-400-025-000 $126.42 62 009-422-001-000 $126.42
28 009-400-026-000 $126.42 63 009-422-002-000 $126.42
29 009-400-027-000 $126.42 64 009-422-003-000 $126.42
30 009-400-028-000 $126.42 65 009-422-004-000 $126.42
31 009-400-029-000 $126.42 66 009-422-005-000 $126.42
32 009-400-030-000 $126.42 67 009-422-006-000 $126.42
33 009-400-031-000 $126.42 68 009-422-007-000 $126.42
34 009-400-032-000 $126.42 69 009-422-008-000 $126.42
35 009-400-033-000 $126.42 70 009-422-009-000 $126.42
71 009-422-010-000 $126.42
72 009-422-011-000 $126.42
73 009-422-012-000 $126.42
74 009-422-013-000 $126.42
75 009-423-001-000 $126.42
76 009-423-002-000 $126.42
77 009-423-003-000 $126.42
78 009-423-004-000 $126.42
79 009-423-005-000 $126.42
80 009-423-006-000 $126.42
81 009-423-007-000 $126.42
82 009-423-008-000 $126.42
83 009-423-009-000 $126.42
84 009-423-010-000 $126.42
85 009-423-011-000 $126.42
86 009-423-012-000 $126.42
87 009-423-013-000 $126.42
88 009-423-014-000 $126.42
89 009-423-015-000 $126.42
90 009-423-016-000 $126.42
91 009-423-017-000 $126.42
92 009-423-018-000 $126.42
93 009-423-019-000 $126.42
94 009-423-020-000 $126.42
95 009-423-021-000 $126.42
96 009-423-022-000 $126.42
97 009-423-023-000 $126.42
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
98 009-423-024-000 $126.42
99 009-423-025-000 $126.42
100 009-423-026-000 $126.42
101 009-423-027-000 $126.42
102 009-423-028-000 $126.42
103 009-423-029-000 $126.42
104 009-423-030-000 $126.42
105 009-423-031-000 $126.42
106 009-423-032-000 $126.42
107 009-423-033-000 $126.42
108 009-423-034-000 $126.42
109 009-423-035-000 $126.42
110 009-423-036-000 $126.42
TOTAL $13,905.74
1. BEGINNING FUND BALANCE $ 522.60
2. LANDSCAPE MAINTENANCE COSTS $ 7,689.52
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 403.51
b. ENGINEERING ADMINISTRATION $ 403.48
c. LEGAL ADMINISTRATION $ 86.10
d. FINANCE ADMINISTRATION $ 59.86
e. TREE TRIMMING $ 833.00
f. GAS & UTILITIES $ 584.85
g. EQUIPMENT g. 366.37
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 81.82
i. MADERA COUNTY PROCESSING FEES $ 122.32
TOTAL COSTS: $ 10,630.81
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (1,868.30)
5. TOTAL ASSESSMENT $ 8,239.92
6. AVERAGE ASSESSMENT PER PARCEL $ 59.28
CITY OF MADERA
ZONE 6B
2024-25
$8,239.92
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-390-002-000 $59.28 36 009-390-040-000 $59.28
2 009-390-003-000 $59.28 37 009-390-041-000 $59.28
3 009-390-004-000 $59.28 38 009-390-042-000 $59.28
4 009-390-005-000 $59.28 39 009-390-043-000 $59.28
5 009-390-006-000 $59.28 40 009-390-044-000 $59.28
6 009-390-007-000 $59.28 41 009-390-045-000 $59.28
7 009-390-008-000 $59.28 42 009-390-046-000 $59.28
8 009-390-009-000 $59.28 43 009-390-047-000 $59.28
9 009-390-010-000 $59.28 44 009-390-048-000 $59.28
10 009-390-011-000 $59.28 45 009-390-049-000 $59.28
11 009-390-012-000 $59.28 46 009-390-050-000 $59.28
12 009-390-013-000 $59.28 47 009-390-051-000 $59.28
13 009-390-014-000 $59.28 48 009-390-052-000 $59.28
14 009-390-015-000 $59.28 49 009-390-053-000 $59.28
15 009-390-016-000 $59.28 50 009-390-054-000 $59.28
16 009-390-017-000 $59.28 51 009-390-055-000 $59.28
17 009-390-018-000 $59.28 52 009-390-056-000 $59.28
18 009-390-019-000 $59.28 53 009-390-057-000 $59.28
19 009-390-020-000 $59.28 54 009-390-058-000 $59.28
20 009-390-021-000 $59.28 55 009-390-061-000 $59.28
21 009-390-022-000 $59.28 56 009-390-062-000 $59.28
22 009-390-023-000 $59.28 57 009-390-063-000 $59.28
23 009-390-024-000 $59.28 58 009-390-064-000 $59.28
24 009-390-025-000 $59.28 59 009-390-065-000 $59.28
25 009-390-026-000 $59.28 60 009-390-066-000 $59.28
26 009-390-027-000 $59.28 61 009-390-067-000 $59.28
SUNSET SOUTHWEST 1, 2, 3, 4, & 5
TOTAL ASSESSMENT:
LANDSCAPE MAINTENANCE DISTRICT
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 6B
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 009-390-031-000 $59.28 62 009-390-068-000 $59.28
28 009-390-032-000 $59.28 63 009-390-069-000 $59.28
29 009-390-033-000 $59.28 64 009-390-070-000 $59.28
30 009-390-034-000 $59.28 65 009-390-071-000 $59.28
31 009-390-035-000 $59.28 66 009-390-072-000 $59.28
32 009-390-036-000 $59.28 67 009-390-073-000 $59.28
33 009-390-037-000 $59.28 68 009-390-074-000 $59.28
34 009-390-038-000 $59.28 69 009-390-075-000 $59.28
35 009-390-039-000 $59.28 70 009-390-076-000 $59.28
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 009-390-077-000 $59.28 116 009-430-039-000 $59.28
72 009-390-078-000 $59.28 117 009-430-040-000 $59.28
73 009-390-079-000 $59.28 118 009-430-041-000 $59.28
74 009-390-080-000 $59.28 119 009-430-042-000 $59.28
75 009-390-081-000 $59.28 120 009-430-043-000 $59.28
76 009-390-082-000 $59.28 121 009-430-044-000 $59.28
77 009-390-083-000 $59.28 122 009-430-045-000 $59.28
78 009-390-084-000 $59.28 123 009-430-046-000 $59.28
79 009-390-085-000 $59.28 124 009-430-047-000 $59.28
80 009-390-086-000 $59.28 125 009-430-048-000 $59.28
81 009-390-087-000 $59.28 126 009-430-049-000 $59.28
82 009-390-088-000 $59.28 127 009-430-050-000 $59.28
83 009-430-001-000 $59.28 128 009-430-051-000 $59.28
84 009-430-002-000 $59.28 129 009-430-052-000 $59.28
85 009-430-003-000 $59.28 130 009-430-053-000 $59.28
86 009-430-004-000 $59.28 131 009-430-054-000 $59.28
87 009-430-005-000 $59.28 132 009-430-055-000 $59.28
88 009-430-006-000 $59.28 133 009-430-056-000 $59.28
89 009-430-007-000 $59.28 134 009-430-057-000 $59.28
90 009-430-008-000 $59.28 135 009-430-058-000 $59.28
91 009-430-009-000 $59.28 136 009-430-059-000 $59.28
92 009-430-010-000 $59.28 137 009-430-060-000 $59.28
93 009-430-011-000 $59.28 138 009-430-061-000 $59.28
94 009-430-012-000 $59.28 139 009-430-062-000 $59.28
95 009-430-013-000 $59.28
TOTAL $8,239.92
96 009-430-014-000 $59.28
97 009-430-015-000 $59.28
98 009-430-016-000 $59.28
99 009-430-017-000 $59.28
100 009-430-018-000 $59.28
101 009-430-019-000 $59.28
102 009-430-020-000 $59.28
103 009-430-021-000 $59.28
104 009-430-022-000 $59.28
105 009-430-023-000 $59.28
106 009-430-024-000 $59.28
107 009-430-025-000 $59.28
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
108 009-430-026-000 $59.28
109 009-430-029-000 $59.28
110 009-430-032-000 $59.28
111 009-430-034-000 $59.28
112 009-430-035-000 $59.28
113 009-430-036-000 $59.28
114 009-430-037-000 $59.28
115 009-430-038-000 $59.28
1. BEGINNING FUND BALANCE (CREDIT/DEBIT) $ (3,127.36)
2. LANDSCAPE MAINTENANCE COSTS $ 2,912.05
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 392.86
b. ENGINEERING ADMINISTRATION $ 406.20
c. LEGAL ADMINISTRATION $ 86.68
d. FINANCE ADMINISTRATION $ 60.26
e. TREE TRIMMING $ 630.00
f. GAS & UTILITIES $ 544.28
g. EQUIPMENT g. 164.39
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 203.66
i. MADERA COUNTY PROCESSING FEES $ 123.20
TOTAL COSTS: $ 5,523.59
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (5,178.95)
5. TOTAL ASSESSMENT $ 3,472.00
6. AVERAGE ASSESSMENT PER PARCEL $ 24.80
CITY OF MADERA
ZONE 7
2024-25
$3,472.00
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-370-001-000 $24.80 36 009-370-036-000 $24.80
2 009-370-002-000 $24.80 37 009-370-037-000 $24.80
3 009-370-003-000 $24.80 38 009-370-038-000 $24.80
4 009-370-004-000 $24.80 39 009-370-039-000 $24.80
5 009-370-005-000 $24.80 40 009-370-040-000 $24.80
6 009-370-006-000 $24.80 41 009-370-041-000 $24.80
7 009-370-007-000 $24.80 42 009-370-042-000 $24.80
8 009-370-008-000 $24.80 43 009-370-043-000 $24.80
9 009-370-009-000 $24.80 44 009-370-044-000 $24.80
10 009-370-010-000 $24.80 45 009-370-045-000 $24.80
11 009-370-011-000 $24.80 46 009-370-046-000 $24.80
12 009-370-012-000 $24.80 47 009-370-047-000 $24.80
13 009-370-013-000 $24.80 48 009-370-048-000 $24.80
14 009-370-014-000 $24.80 49 009-370-049-000 $24.80
15 009-370-015-000 $24.80 50 009-370-050-000 $24.80
16 009-370-016-000 $24.80 51 009-370-051-000 $24.80
17 009-370-017-000 $24.80 52 009-370-052-000 $24.80
18 009-370-018-000 $24.80 53 009-370-053-000 $24.80
19 009-370-019-000 $24.80 54 009-370-054-000 $24.80
20 009-370-020-000 $24.80 55 009-380-001-000 $24.80
21 009-370-021-000 $24.80 56 009-380-002-000 $24.80
22 009-370-022-000 $24.80 57 009-380-003-000 $24.80
23 009-370-023-000 $24.80 58 009-380-004-000 $24.80
24 009-370-024-000 $24.80 59 009-380-005-000 $24.80
25 009-370-025-000 $24.80 60 009-380-006-000 $24.80
26 009-370-026-000 $24.80 61 009-380-007-000 $24.80
TOTAL ASSESSMENT:
LANDSCAPE MAINTENANCE DISTRICT
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 7 - TOWN & COUNTRY ESTATES
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 009-370-027-000 $24.80 62 009-380-008-000 $24.80
28 009-370-028-000 $24.80 63 009-380-009-000 $24.80
29 009-370-029-000 $24.80 64 009-380-010-000 $24.80
30 009-370-030-000 $24.80 65 009-380-011-000 $24.80
31 009-370-031-000 $24.80 66 009-380-012-000 $24.80
32 009-370-032-000 $24.80 67 009-380-013-000 $24.80
33 009-370-033-000 $24.80 68 009-380-014-000 $24.80
34 009-370-034-000 $24.80 69 009-380-015-000 $24.80
35 009-370-035-000 $24.80 70 009-380-016-000 $24.80
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 009-380-017-000 $24.80 116 009-380-062-000 $24.80
72 009-380-018-000 $24.80 117 009-380-063-000 $24.80
73 009-380-019-000 $24.80 118 009-380-064-000 $24.80
74 009-380-020-000 $24.80 119 009-380-065-000 $24.80
75 009-380-021-000 $24.80 120 009-380-066-000 $24.80
76 009-380-022-000 $24.80 121 009-380-067-000 $24.80
77 009-380-023-000 $24.80 122 009-380-068-000 $24.80
78 009-380-024-000 $24.80 123 009-380-069-000 $24.80
79 009-380-025-000 $24.80 124 009-380-070-000 $24.80
80 009-380-026-000 $24.80 125 009-380-071-000 $24.80
81 009-380-027-000 $24.80 126 009-380-072-000 $24.80
82 009-380-028-000 $24.80 127 009-380-073-000 $24.80
83 009-380-029-000 $24.80 128 009-380-074-000 $24.80
84 009-380-030-000 $24.80 129 009-380-075-000 $24.80
85 009-380-031-000 $24.80 130 009-380-076-000 $24.80
86 009-380-032-000 $24.80 131 009-380-077-000 $24.80
87 009-380-033-000 $24.80 132 009-380-078-000 $24.80
88 009-380-034-000 $24.80 133 009-380-079-000 $24.80
89 009-380-035-000 $24.80 134 009-380-080-000 $24.80
90 009-380-036-000 $24.80 135 009-380-081-000 $24.80
91 009-380-037-000 $24.80 136 009-380-082-000 $24.80
92 009-380-038-000 $24.80 137 009-380-083-000 $24.80
93 009-380-039-000 $24.80 138 009-370-058-000 $24.80
94 009-380-040-000 $24.80 139 009-370-059-000 $24.80
95 009-380-041-000 $24.80 140 009-370-060-000 $24.80
96 009-380-042-000 $24.80 TOTAL $3,472.00
97 009-380-043-000 $24.80
98 009-380-044-000 $24.80
99 009-380-045-000 $24.80
100 009-380-046-000 $24.80
101 009-380-047-000 $24.80
102 009-380-048-000 $24.80
103 009-380-049-000 $24.80
104 009-380-050-000 $24.80
105 009-380-051-000 $24.80
106 009-380-052-000 $24.80
107 009-380-053-000 $24.80
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
108 009-380-054-000 $24.80
109 009-380-055-000 $24.80
110 009-380-056-000 $24.80
111 009-380-057-000 $24.80
112 009-380-058-000 $24.80
113 009-380-059-000 $24.80
114 009-380-060-000 $24.80
115 009-380-061-000 $24.80
1. BEGINNING FUND BALANCE $ (2,056.19)
2. LANDSCAPE MAINTENANCE COSTS $ 856.48
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 356.79
b. ENGINEERING ADMINISTRATION $ 586.10
c. LEGAL ADMINISTRATION $ 125.07
d. FINANCE ADMINISTRATION $ 86.95
e. TREE TRIMMING $ 1,553.00
f. GAS & UTILITIES $ 1,222.59
g. EQUIPMENT g. 164.39
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 81.82
i. MADERA COUNTY PROCESSING FEES $ 181.28
TOTAL COSTS: $ 5,214.47
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (2,568.18)
5. TOTAL ASSESSMENT $ 4,702.48
6. AVERAGE ASSESSMENT PER PARCEL $ 22.83
CITY OF MADERA
ZONE 8
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-310-001-000 $18.46 HA - Madera 36 012-310-036-000 $18.46 2 012-310-002-000 $18.46 37 012-310-037-000 $18.46
3 012-310-003-000 $18.46 38 012-310-038-000 $18.46
4 012-310-004-000 $18.46 39 012-310-039-000 $18.46
5 012-310-005-000 $18.46 40 012-310-040-000 $18.46
6 012-310-006-000 $18.46 41 012-310-041-000 $18.46
7 012-310-007-000 $18.46 42 012-310-042-000 $18.46
8 012-310-008-000 $18.46 43 012-310-043-000 $18.46
9 012-310-009-000 $18.46 44 012-310-044-000 $18.46
10 012-310-010-000 $18.46 45 012-310-045-000 $18.46
11 012-310-011-000 $18.46 46 012-310-046-000 $18.46
12 012-310-012-000 $18.46 47 012-310-047-000 $18.46
13 012-310-013-000 $18.46 48 012-310-048-000 $18.46
14 012-310-014-000 $18.46 49 012-310-049-000 $18.46
15 012-310-015-000 $18.46 50 012-310-050-000 $18.46
16 012-310-016-000 $18.46 51 012-310-054-000 $18.46
17 012-310-017-000 $18.46 52 012-320-003-000 $202.91
18 012-310-018-000 $18.46 53 012-320-005-000 $157.02
19 012-310-019-000 $18.46 54 012-330-073-000 $18.46
20 012-310-020-000 $18.46 55 012-311-001-000 $18.46
21 012-310-021-000 $18.46 56 012-311-002-000 $18.46
22 012-310-022-000 $18.46 HA - Madera 57 012-311-003-000 $18.46 23 012-310-023-000 $18.46 58 012-311-004-000 $18.46
24 012-310-024-000 $18.46 59 012-311-005-000 $18.46
25 012-310-025-000 $18.46 60 012-311-006-000 $18.46
26 012-310-026-000 $18.46 61 012-311-007-000 $18.46
LANDSCAPE MAINTENANCE DISTRICT
ZONE 8 - VINEYARD ESTATES 2, 3, 4, & 5
TOTAL ASSESSMENT:
$4,702.48
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 012-310-027-000 $18.46 62 012-311-008-000 $18.46
28 012-310-028-000 $18.46 63 012-311-009-000 $18.46
29 012-310-029-000 $18.46 64 012-311-010-000 $18.46
30 012-310-030-000 $18.46 65 012-311-011-000 $18.46
31 012-310-031-000 $18.46 66 012-311-012-000 $18.46
32 012-310-032-000 $18.46 67 012-311-013-000 $18.46
33 012-310-033-000 $18.46 68 012-311-014-000 $18.46
34 012-310-034-000 $18.46 69 012-311-015-000 $18.46
35 012-310-035-000 $18.46 70 012-311-016-000 $18.46
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 012-311-017-000 $18.46 116 012-340-034-000 $18.46
72 012-311-018-000 $18.46 117 012-340-035-000 $18.46
73 012-311-019-000 $18.46 118 012-340-036-000 $18.46
74 012-311-020-000 $18.46 119 012-340-037-000 $18.46
75 012-311-021-000 $18.46 120 012-340-038-000 $18.46
76 012-311-022-000 $18.46 121 012-340-039-000 $18.46
77 012-311-023-000 $18.46 122 012-340-040-000 $18.46
78 012-311-024-000 $18.46 123 012-340-041-000 $18.46
79 012-311-025-000 $18.46 124 012-340-042-000 $18.46
80 012-311-026-000 $18.46 125 012-340-043-000 $18.46
81 012-311-027-000 $18.46 126 012-340-044-000 $18.46
82 012-311-028-000 $18.46 127 012-340-045-000 $18.46
83 012-311-029-000 $18.46 128 012-340-046-000 $18.46
84 012-311-030-000 $18.16 HA - Madera 129 012-340-047-000 $18.46 85 012-340-003-000 $18.46 130 012-340-048-000 $18.46
86 012-340-004-000 $18.46 131 012-330-013-000 $18.46
87 012-340-005-000 $18.46 132 012-330-012-000 $18.46
88 012-340-006-000 $18.46 133 012-330-011-000 $18.46
89 012-340-007-000 $18.46 134 012-330-010-000 $18.46
90 012-340-008-000 $18.46 135 012-330-009-000 $18.46
91 012-340-009-000 $18.46 136 012-330-008-000 $18.46
92 012-340-010-000 $18.46 137 012-330-007-000 $18.46
93 012-340-011-000 $18.46 138 012-330-006-000 $18.46
94 012-340-012-000 $18.46 139 012-330-021-000 $18.46
95 012-340-013-000 $18.46 140 012-330-020-000 $18.46
96 012-340-014-000 $18.46 141 012-330-019-000 $18.46
97 012-340-015-000 $18.46 142 012-330-018-000 $18.46
98 012-340-016-000 $18.46 143 012-330-017-000 $18.46
99 012-340-017-000 $18.46 144 012-330-016-000 $18.46
100 012-340-018-000 $18.46 145 012-330-015-000 $18.46
101 012-340-019-000 $18.46 146 012-330-014-000 $18.46
102 012-340-020-000 $18.46 147 012-330-028-000 $18.46
103 012-340-021-000 $18.46 148 012-330-027-000 $18.46
104 012-340-022-000 $18.46 149 012-330-026-000 $18.46
105 012-340-023-000 $18.46 150 012-330-025-000 $18.46
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
106 012-340-024-000 $18.46 151 012-330-024-000 $18.46
107 012-340-025-000 $18.46 152 012-330-023-000 $18.46
108 012-340-026-000 $18.46 153 012-330-022-000 $18.46
109 012-340-027-000 $18.46 154 012-330-036-000 $18.46
110 012-340-028-000 $18.46 155 012-330-037-000 $18.46
111 012-340-029-000 $18.46 156 012-330-038-000 $18.46
112 012-340-030-000 $18.46 157 012-330-039-000 $18.46
113 012-340-031-000 $18.46 158 012-330-040-000 $18.46
114 012-340-032-000 $18.46 159 012-330-041-000 $18.46
115 012-340-033-000 $18.46 160 012-330-042-000 $18.46
161 012-330-043-000 $18.46
162 012-330-035-000 $18.46
163 012-330-034-000 $18.46
164 012-330-033-000 $18.46
165 012-330-032-000 $18.46
166 012-330-031-000 $18.46
167 012-330-030-000 $18.46
168 012-330-029-000 $18.46
169 012-330-072-000 $18.46
170 012-330-071-000 $18.46
171 012-330-070-000 $18.46
172 012-330-069-000 $18.46
173 012-330-068-000 $18.46
174 012-330-067-000 $18.46
175 012-330-066-000 $18.46
176 012-330-045-000 $18.46
177 012-330-046-000 $18.46
178 012-330-047-000 $18.46
179 012-330-048-000 $18.46
180 012-330-049-000 $18.46
181 012-330-065-000 $18.46
182 012-330-064-000 $18.46
183 012-330-063-000 $18.46
184 012-330-062-000 $18.46
185 012-330-061-000 $18.46
186 012-330-060-000 $18.46
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
187 012-330-059-000 $18.46
188 012-330-058-000 $18.46
189 012-330-057-000 $18.46
190 012-330-056-000 $18.46
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
191 012-330-055-000 $18.46
192 012-330-054-000 $18.46
193 012-330-053-000 $18.46
194 012-330-052-000 $18.46
195 012-330-051-000 $18.46
196 012-330-050-000 $18.46
197 012-312-001-000 $20.51
198 012-312-002-000 $20.51
199 012-312-003-000 $20.51
200 012-312-004-000 $20.51
201 012-312-005-000 $20.51
202 012-312-006-000 $20.51
203 012-312-007-000 $20.51
204 012-312-008-000 $20.51
205 012-312-009-000 $20.51
206 012-320-008-000 $576.44
TOTAL $4,702.18
To be billed via A/R
55.08 Total to County Assessor
$4,647.10
1. BEGINNING FUND BALANCE $ (1,332.84)
2. LANDSCAPE MAINTENANCE COSTS $ 2,132.65
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 291.62
b. ENGINEERING ADMINISTRATION $ 209.95
c. LEGAL ADMINISTRATION $ 44.80
d. FINANCE ADMINISTRATION $ 31.15
e. TREE TRIMMING $ 473.00
f. GAS & UTILITIES $ 158.57
g. EQUIPMENT g. 159.12
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 122.72
i. MADERA COUNTY PROCESSING FEES $ 59.84
TOTAL COSTS: $ 3,683.42
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (2,765.46)
5. TOTAL ASSESSMENT $ 2,250.80
6. AVERAGE ASSESSMENT PER PARCEL $ 33.10
CITY OF MADERA
ZONE 9
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-133-040-000 $33.10 36 012-350-034-000 $33.10
2 012-133-041-000 $33.10 37 012-350-035-000 $33.10
3 012-350-001-000 $33.10 38 012-350-036-000 $33.10
4 012-350-002-000 $33.10 39 012-350-037-000 $33.10
5 012-350-003-000 $33.10 40 012-350-038-000 $33.10
6 012-350-004-000 $33.10 41 012-350-039-000 $33.10
7 012-350-005-000 $33.10 42 012-350-040-000 $33.10
8 012-350-006-000 $33.10 43 012-350-041-000 $33.10
9 012-350-007-000 $33.10 44 012-350-042-000 $33.10
10 012-350-008-000 $33.10 45 012-350-043-000 $33.10
11 012-350-009-000 $33.10 46 012-350-044-000 $33.10
12 012-350-010-000 $33.10 47 012-350-045-000 $33.10
13 012-350-011-000 $33.10 48 012-350-046-000 $33.10
14 012-350-012-000 $33.10 49 012-350-047-000 $33.10
15 012-350-013-000 $33.10 50 012-350-048-000 $33.10
16 012-350-014-000 $33.10 51 012-350-049-000 $33.10
17 012-350-015-000 $33.10 52 012-350-050-000 $33.10
18 012-350-016-000 $33.10 53 012-350-051-000 $33.10
19 012-350-017-000 $33.10 54 012-350-052-000 $33.10
20 012-350-018-000 $33.10 55 012-350-053-000 $33.10
21 012-350-019-000 $33.10 56 012-350-054-000 $33.10
22 012-350-020-000 $33.10 57 012-350-057-000 $33.10
23 012-350-021-000 $33.10 58 012-350-058-000 $33.10
24 012-350-022-000 $33.10 59 012-350-059-000 $33.10
25 012-350-023-000 $33.10 60 012-350-060-000 $33.10
26 012-350-024-000 $33.10 61 012-350-061-000 $33.10
LANDSCAPE MAINTENANCE DISTRICT
ZONE 9 - ORCHARD ESTATES
TOTAL ASSESSMENT:
$2,250.80
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 012-350-025-000 $33.10 62 012-350-062-000 $33.10
28 012-350-026-000 $33.10 63 012-350-063-000 $33.10
29 012-350-027-000 $33.10 64 012-350-064-000 $33.10
30 012-350-028-000 $33.10 65 012-350-065-000 $33.10
31 012-350-029-000 $33.10 66 012-350-066-000 $33.10
32 012-350-030-000 $33.10 67 012-350-067-000 $33.10
33 012-350-031-000 $33.10 68 012-350-068-000 $33.10
34 012-350-032-000 $33.10
35 012-350-033-000 $33.10 TOTAL $2,250.80
1. BEGINNING FUND BALANCE $ (1,087.48)
2. LANDSCAPE MAINTENANCE COSTS $ 0.00
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 295.14
b. ENGINEERING ADMINISTRATION $ 57.31
c. LEGAL ADMINISTRATION $ 12.23
d. FINANCE ADMINISTRATION $ 8.50
e. TREE TRIMMING $ 358.00
f. GAS & UTILITIES $ 171.98
g. EQUIPMENT g. 193.41
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 0.00
i. MADERA COUNTY PROCESSING FEES $ 10.56
TOTAL COSTS: $ 1,107.14
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (1,873.77)
5. TOTAL ASSESSMENT $ 320.84
6. AVERAGE ASSESSMENT PER PARCEL $ 26.74
CITY OF MADERA
ZONE 10A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-460-040-000 $24.68
2 006-460-041-000 $24.68
3 006-460-009-000 $24.68
4 006-460-010-000 $24.68
5 006-460-011-000 $24.68
6 006-460-012-000 $24.68
7 006-460-013-000 $24.68
8 006-460-014-000 $24.68
9 006-460-015-000 $24.68
10 006-460-016-000 $24.68
11 006-460-017-000 $24.68
12 006-460-039-000 $49.36
TOTAL $320.84
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10A - VENTURI SUBDIVISION
TOTAL ASSESSMENT:
$320.84
1. BEGINNING FUND BALANCE $ 1,395.61
2. LANDSCAPE MAINTENANCE COSTS $ 51.56
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 252.18
b. ENGINEERING ADMINISTRATION $ 155.44
c. LEGAL ADMINISTRATION $ 33.17
d. FINANCE ADMINISTRATION $ 23.06
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 2.63
g. EQUIPMENT g. 3.35
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 4.89
i. MADERA COUNTY PROCESSING FEES $ 42.24
TOTAL COSTS: $ 703.52
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 1,533.54
5. TOTAL ASSESSMENT $ 841.45
6. AVERAGE ASSESSMENT PER PARCEL $ 17.53
CITY OF MADERA
ZONE 10B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-460-024-000 $17.90 36 006-492-010-000 $17.90
2 006-460-025-000 $17.90 37 006-492-011-000 $17.90
3 006-460-026-000 $17.90 38 006-492-012-000 $17.90
4 006-460-027-000 $17.90 39 006-492-013-000 $17.90
5 006-460-028-000 $17.90 40 006-492-014-000 $17.90
6 006-460-029-000 $17.90 41 006-492-015-000 $17.90
7 006-460-030-000 $17.90 42 006-492-016-000 $17.90
8 006-460-031-000 $17.90 43 006-492-017-000 $17.90
9 006-491-001-000 $17.90 44 006-492-018-000 $17.90
10 006-491-002-000 $17.90 45 006-492-019-000 $17.90
11 006-491-003-000 $17.90 46 006-492-020-000 $17.90
12 006-491-004-000 $17.90 47 006-492-021-000 $17.90
13 006-491-005-000 $17.90 48 006-492-022-000 $17.90
14 006-491-006-000 $17.90
15 006-491-007-000 $17.90 TOTAL $841.45
16 006-491-008-000 $17.90
17 006-491-009-000 $17.90
18 006-491-010-000 $17.90
19 006-491-011-000 $17.90
20 006-491-012-000 $17.90
21 006-491-013-000 $17.90
22 006-491-014-000 $17.90
23 006-491-015-000 $17.90
24 006-491-016-000 $17.90
25 006-491-017-000 $17.90
26 006-491-018-000 $17.90
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$841.45
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10B - PEBBLE BEACH I & II
TOTAL ASSESSMENT:
27 006-492-001-000 $17.90
28 006-492-025-000 $17.90
29 $0.00
30 006-492-004-000 $17.90
31 006-492-005-000 $17.90
32 00-6492-006-000 $17.90
33 006-492-007-000 $17.90
34 006-492-008-000 $17.90
35 006-492-009-000 $17.90
1. BEGINNING FUND BALANCE $ 796.36
2. LANDSCAPE MAINTENANCE COSTS $ 513.81
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 256.91
b. ENGINEERING ADMINISTRATION $ 160.89
c. LEGAL ADMINISTRATION $ 34.33
d. FINANCE ADMINISTRATION $ 23.87
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 24.13
g. EQUIPMENT g. 44.49
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 44.96
i. MADERA COUNTY PROCESSING FEES $ 44.00
TOTAL COSTS: $ 1,282.39
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 747.96
5. TOTAL ASSESSMENT $ 1,234.00
6. AVERAGE ASSESSMENT PER PARCEL 24.68
CITY OF MADERA
ZONE 10C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-493-001-000 $24.68 36 006-494-015-000 $24.68
2 006-493-002-000 $24.68 37 006-494-016-000 $24.68
3 006-493-003-000 $24.68 38 006-494-017-000 $24.68
4 006-493-004-000 $24.68 39 006-494-018-000 $24.68
5 006-493-005-000 $24.68 40 006-494-019-000 $24.68
6 006-493-006-000 $24.68 41 006-494-020-000 $24.68
7 006-493-007-000 $24.68 42 006-494-021-000 $24.68
8 006-493-008-000 $24.68 43 006-494-022-000 $24.68
9 006-493-009-000 $24.68 44 006-494-023-000 $24.68
10 006-493-010-000 $24.68 45 006-494-024-000 $24.68
11 006-493-011-000 $24.68 46 006-494-025-000 $24.68
12 006-493-012-000 $24.68 47 006-494-026-000 $24.68
13 006-493-013-000 $24.68 48 006-494-027-000 $24.68
14 006-493-014-000 $24.68 49 006-494-028-000 $24.68
15 006-493-015-000 $24.68 50 006-494-029-000 $24.68
16 006-493-016-000 $24.68 TOTAL $1,234.00
17 006-493-017-000 $24.68
18 006-493-018-000 $24.68
19 006-493-019-000 $24.68
20 006-493-020-000 $24.68
21 006-493-021-000 $24.68
22 006-494-001-000 $24.68
23 006-494-002-000 $24.68
24 006-494-003-000 $24.68
25 006-494-004-000 $24.68
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10C - PEBBLE BEACH III & IV
TOTAL ASSESSMENT:
$1,234.00
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
26 006-494-005-000 $24.68
27 006-494-006-000 $24.68
28 006-494-007-000 $24.68
29 006-494-008-000 $24.68
30 006-494-009-000 $24.68
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
31 006-494-010-000 $24.68
32 006-494-011-000 $24.68
33 006-494-012-000 $24.68
34 006-494-013-000 $24.68
35 006-494-014-000 $24.68
1. BEGINNING FUND BALANCE $ (492.14)
2. LANDSCAPE MAINTENANCE COSTS $ 308.28
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 253.47
b. ENGINEERING ADMINISTRATION $ 98.20
c. LEGAL ADMINISTRATION $ 20.95
d. FINANCE ADMINISTRATION $ 14.57
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 14.48
g. EQUIPMENT g. 21.69
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 26.99
i. MADERA COUNTY PROCESSING FEES $ 23.76
TOTAL COSTS: $ 917.40
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (815.01)
5. TOTAL ASSESSMENT $ 594.52
6. AVERAGE ASSESSMENT PER PARCEL 22.02
CITY OF MADERA
ZONE 10D
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-495-001-000 $22.16
2 006-495-002-000 $22.16
3 006-495-003-000 $22.16
4 006-495-004-000 $22.16
5 006-495-005-000 $22.16
6 006-495-006-000 $22.16
7 006-495-007-000 $22.16
8 006-495-008-000 $22.16
9 006-495-009-000 $22.16
10 006-495-010-000 $22.16
11 006-495-011-000 $22.16
12 006-495-012-000 $22.16
13 006-495-013-000 $22.16
14 006-495-014-000 $22.16
15 006-495-015-000 $22.16
16 006-495-036-000 $20.74
17 006-495-018-000 $22.16
18 006-495-019-000 $22.16
19 006-495-020-000 $22.16
20 006-495-021-000 $22.16
21 006-495-022-000 $22.16
22 006-495-023-000 $22.16
23 006-495-035-000 $22.08
24 006-495-026-000 $22.16
25 006-495-034-000 $19.86
26 006-495-029-000 $22.16
27 006-495-030-000 $22.16
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10D - PEBBLE BEACH V
TOTAL ASSESSMENT:
$594.52
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
TOTAL $594.52
1. BEGINNING FUND BALANCE $ 3.25
2. LANDSCAPE MAINTENANCE COSTS $ 351.86
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 255.98
b. ENGINEERING ADMINISTRATION $ 84.57
c. LEGAL ADMINISTRATION $ 18.05
d. FINANCE ADMINISTRATION $ 12.55
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 16.66
g. EQUIPMENT g. 38.09
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 31.05
i. MADERA COUNTY PROCESSING FEES $ 19.36
TOTAL COSTS: $ 963.16
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 97.93
5. TOTAL ASSESSMENT $ 1,057.84
6. AVERAGE ASSESSMENT PER PARCEL 48.08
CITY OF MADERA
ZONE 10E
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-496-076-000 $48.08
3 006-496-077-000 $48.08
5 006-496-078-000 $48.08
7 006-496-079-000 $48.08
9 006-496-080-000 $48.08
11 006-496-081-000 $48.08
13 006-496-082-000 $48.08
15 006-496-083-000 $48.08
17 006-496-084-000 $48.08
19 006-496-019-000 $48.08
20 006-496-020-000 $48.08
21 006-496-021-000 $48.08
22 006-496-022-000 $48.08
23 006-496-023-000 $48.08
24 006-496-024-000 $48.08
25 006-496-025-000 $48.08
26 006-496-026-000 $48.08
27 006-496-027-000 $48.08
28 006-496-028-000 $48.08
29 006-496-029-000 $48.08
30 006-496-030-000 $48.08
31 006-496-031-000 $48.08
TOTAL ASSESSMENT TO COUNTY: $1,057.76
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10E - PEBBLE BEACH VI
TOTAL ASSESSMENT:
$1,057.84
1. BEGINNING FUND BALANCE $ 1,740.22
2. LANDSCAPE MAINTENANCE COSTS $ 465.36
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 257.62
b. ENGINEERING ADMINISTRATION $ 136.36
c. LEGAL ADMINISTRATION $ 29.10
d. FINANCE ADMINISTRATION $ 20.23
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 22.04
g. EQUIPMENT g. 30.22
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 41.06
i. MADERA COUNTY PROCESSING FEES $ 36.08
TOTAL COSTS: $ 1,173.06
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 1,578.46
5. TOTAL ASSESSMENT $ 1,011.04
6. AVERAGE ASSESSMENT PER PARCEL 24.67
CITY OF MADERA
ZONE 10F
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-496-034-000 $24.66 36 006-496-069-000 $24.66
2 006-496-035-000 $24.66 37 006-496-070-000 $24.66
3 006-496-036-000 $24.66 38 006-496-071-000 $24.66
4 006-496-037-000 $24.66 39 006-496-072-000 $24.66
5 006-496-038-000 $24.66 40 006-496-073-000 $24.66
6 006-496-039-000 $24.66 41 006-496-074-000 $24.66
7 006-496-040-000 $24.66
8 006-496-041-000 $24.66 TOTAL $1,011.06
9 006-496-042-000 $24.66
10 006-496-043-000 $24.66
11 006-496-044-000 $24.66
12 006-496-045-000 $24.66
13 006-496-046-000 $24.66
14 006-496-047-000 $24.66
15 006-496-048-000 $24.66
16 006-496-049-000 $24.66
17 006-496-050-000 $24.66
18 006-496-051-000 $24.66
19 006-496-052-000 $24.66
20 006-496-053-000 $24.66
21 006-496-054-000 $24.66
22 006-496-055-000 $24.66
23 006-496-056-000 $24.66
24 006-496-057-000 $24.66
25 006-496-058-000 $24.66
26 006-496-059-000 $24.66
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$1,011.04
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10 F - PEBBLE BEACH VII
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 006-496-060-000 $24.66
28 006-496-061-000 $24.66
29 006-496-062-000 $24.66
30 006-496-063-000 $24.66
31 006-496-064-000 $24.66
32 006-496-065-000 $24.66
33 006-496-066-000 $24.66
34 006-496-067-000 $24.66
35 006-496-068-000 $24.66
1. BEGINNING FUND BALANCE $ (510.83)
2. LANDSCAPE MAINTENANCE COSTS $ 1,028.50
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 257.62
b. ENGINEERING ADMINISTRATION $ 149.99
c. LEGAL ADMINISTRATION $ 32.00
d. FINANCE ADMINISTRATION $ 22.25
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 50.59
g. EQUIPMENT g. 60.12
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 68.41
i. MADERA COUNTY PROCESSING FEES $ 40.48
TOTAL COSTS: $ 1,844.96
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (810.19)
5. TOTAL ASSESSMENT $ 1,545.13
6. AVERAGE ASSESSMENT PER PARCEL 33.60
CITY OF MADERA
ZONE 10G
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-497-001-000 $33.59 36 006-497-036-000 $33.59
2 006-497-002-000 $33.59 37 006-497-037-000 $33.59
3 006-497-003-000 $33.59 38 006-497-038-000 $33.59
4 006-497-004-000 $33.59 39 006-497-039-000 $33.59
5 006-497-005-000 $33.59 40 006-497-040-000 $33.59
6 006-497-006-000 $33.59 41 006-497-041-000 $33.59
7 006-497-007-000 $33.59 42 006-497-042-000 $33.59
8 006-497-008-000 $33.59 43 006-497-043-000 $33.59
9 006-497-009-000 $33.59 44 006-497-044-000 $33.59
10 006-497-010-000 $33.59 45 006-497-045-000 $33.59
11 006-497-011-000 $33.59 46 006-497-046-000 $33.59
12 006-497-012-000 $33.59
13 006-497-013-000 $33.59 TOTAL $1,545.13
14 006-497-014-000 $33.59
15 006-497-015-000 $33.59
16 006-497-016-000 $33.59
17 006-497-017-000 $33.59
18 006-497-018-000 $33.59
19 006-497-019-000 $33.59
20 006-497-020-000 $33.59
21 006-497-021-000 $33.59
22 006-497-022-000 $33.59
23 006-497-023-000 $33.59
24 006-497-024-000 $33.59
25 006-497-025-000 $33.59
26 006-497-026-000 $33.59
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$1,545.13
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10G - PEBBLE BEACH VIII
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 006-497-027-000 $33.59
28 006-497-028-000 $33.59
29 006-497-029-000 $33.59
30 006-497-030-000 $33.59
31 006-497-031-000 $33.59
32 006-497-032-000 $33.59
33 006-497-033-000 $33.59
34 006-497-034-000 $33.59
35 006-497-035-000 $33.59
1. BEGINNING FUND BALANCE $ (913.17)
2. LANDSCAPE MAINTENANCE COSTS $ 1,467.31
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 261.22
b. ENGINEERING ADMINISTRATION $ 169.07
c. LEGAL ADMINISTRATION $ 36.08
d. FINANCE ADMINISTRATION $ 25.08
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 72.71
g. EQUIPMENT g. 169.42
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 135.48
i. MADERA COUNTY PROCESSING FEES $ 46.64
TOTAL COSTS: $ 2,518.01
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (1,623.22)
5. TOTAL ASSESSMENT $ 1,807.42
6. AVERAGE ASSESSMENT PER PARCEL 34.11
CITY OF MADERA
ZONE 10H
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-498-001-000 $34.10 36 006-498-036-000 $34.10
2 006-498-002-000 $34.10 37 006-498-037-000 $34.10
3 006-498-003-000 $34.10 38 006-498-038-000 $34.10
4 006-498-004-000 $34.10 39 006-498-039-000 $34.10
5 006-498-005-000 $34.10 40 006-498-040-000 $34.10
6 006-498-006-000 $34.10 41 006-498-041-000 $34.10
7 006-498-007-000 $34.10 42 006-498-042-000 $34.10
8 006-498-008-000 $34.10 43 006-498-043-000 $34.10
9 006-498-009-000 $34.10 44 006-498-044-000 $34.10
10 006-498-010-000 $34.10 45 006-498-045-000 $34.10
11 006-498-011-000 $34.10 46 006-498-046-000 $34.10
12 006-498-012-000 $34.10 47 006-498-047-000 $34.10
13 006-498-013-000 $34.10 48 006-498-048-000 $34.10
14 006-498-014-000 $34.10 49 006-498-049-000 $34.10
15 006-498-015-000 $34.10 50 006-498-050-000 $34.10
16 006-498-016-000 $34.10 51 006-498-051-000 $34.10
17 006-498-017-000 $34.10 52 006-498-052-000 $34.10
18 006-498-018-000 $34.10 53 006-498-053-000 $34.10
19 006-498-019-000 $34.10
20 006-498-020-000 $34.10 TOTAL $1,807.42
21 006-498-021-000 $34.10
22 006-498-022-000 $34.10
23 006-498-023-000 $34.10
24 006-498-024-000 $34.10
25 006-498-025-000 $34.10
26 006-498-026-000 $34.10
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10 H - PEBBLE BEACH IX
TOTAL ASSESSMENT:
$1,807.42
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 006-498-027-000 $34.10
28 006-498-028-000 $34.10
29 006-498-029-000 $34.10
30 006-498-030-000 $34.10
31 006-498-031-000 $34.10
32 006-498-032-000 $34.10
33 006-498-033-000 $34.10
34 006-498-034-000 $34.10
35 006-498-035-000 $34.10
1. BEGINNING FUND BALANCE $ 122.27
2. LANDSCAPE MAINTENANCE COSTS $ 0.00
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 258.46
b. ENGINEERING ADMINISTRATION $ 84.57
c. LEGAL ADMINISTRATION $ 18.05
d. FINANCE ADMINISTRATION $ 12.55
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 10.62
g. EQUIPMENT g. 19.34
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 19.80
i. MADERA COUNTY PROCESSING FEES $ 19.36
TOTAL COSTS: $ 577.73
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 325.04
5. TOTAL ASSESSMENT $ 780.28
6. AVERAGE ASSESSMENT PER PARCEL 35.48
CITY OF MADERA
ZONE 10I
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-499-001-000 $35.47
2 006-499-002-000 $35.47
3 006-499-003-000 $35.47
4 006-499-004-000 $35.47
5 006-499-005-000 $35.47
6 006-499-006-000 $35.47
7 006-499-007-000 $35.47
8 006-499-008-000 $35.47
9 006-499-009-000 $35.47
10 006-499-010-000 $35.47
11 006-499-011-000 $35.47
12 006-499-012-000 $35.47
13 006-499-013-000 $35.47
14 006-499-014-000 $35.47
15 006-499-015-000 $35.47
16 006-499-016-000 $35.47
17 006-499-017-000 $35.47
18 006-499-018-000 $35.47
19 006-499-019-000 $35.47
20 006-499-020-000 $35.47
21 006-499-021-000 $35.47
22 006-499-022-000 $35.47
TOTAL $780.28
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 10 I - PEBBLE BEACH X
TOTAL ASSESSMENT:
$780.28
1. BEGINNING FUND BALANCE $ 1,687.21
2. LANDSCAPE MAINTENANCE COSTS $ 32,123.32
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 591.84
b. ENGINEERING ADMINISTRATION $ 239.93
c. LEGAL ADMINISTRATION $ 51.20
d. FINANCE ADMINISTRATION $ 35.60
e. TREE TRIMMING $ 3,848.00
f. GAS & UTILITIES $ 1,302.37
g. EQUIPMENT g. 1,320.28
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 81.82
i. MADERA COUNTY PROCESSING FEES $ 69.52
TOTAL COSTS: $ 39,663.88
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (11,954.07)
5. TOTAL ASSESSMENT $ 26,022.60
6. AVERAGE ASSESSMENT PER PARCEL 329.40
CITY OF MADERA
ZONE 12
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-470-001-000 $329.40 36 006-480-049-000 $329.40
2 006-470-002-000 $329.40 37 006-480-004-000 $329.40
3 006-470-003-000 $329.40 38 006-480-005-000 $329.40
4 006-470-004-000 $329.40 39 006-480-006-000 $329.40
5 006-470-005-000 $329.40 40 006-480-007-000 $329.40
6 006-470-006-000 $329.40 41 006-480-008-000 $329.40
7 006-470-007-000 $329.40 42 006-480-009-000 $329.40
8 006-470-008-000 $329.40 43 006-480-010-000 $329.40
9 006-470-037-000 $329.40 44 006-480-011-000 $329.40
10 006-470-038-000 $329.40 45 006-480-012-000 $329.40
11 006-470-039-000 $329.40 46 006-480-013-000 $329.40
12 006-470-040-000 $329.40 47 006-480-014-000 $329.40
13 006-470-041-000 $329.40 48 006-480-015-000 $329.40
14 006-470-042-000 $329.40 49 006-480-016-000 $329.40
15 006-470-016-000 $329.40 50 006-480-017-000 $329.40
16 006-470-017-000 $329.40 51 006-480-018-000 $329.40
17 006-470-018-000 $329.40 52 006-480-019-000 $329.40
18 006-470-019-000 $329.40 53 006-480-020-000 $329.40
19 006-470-020-000 $329.40 54 006-480-021-000 $329.40
20 006-470-021-000 $329.40 55 006-480-022-000 $329.40
21 006-470-022-000 $329.40 56 006-480-023-000 $329.40
22 006-470-043-000 $329.40 57 006-480-024-000 $329.40
23 006-470-044-000 $329.40 58 006-480-025-000 $329.40
24 006-470-045-000 $329.40 59 006-480-026-000 $329.40
25 006-470-046-000 $329.40 60 006-480-027-000 $329.40
26 006-470-047-000 $329.40 61 006-480-028-000 $329.40
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 12 - FRENCH COVE 1 & 2
TOTAL ASSESSMENT:
$26,022.60
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 006-470-029-000 $329.40 62 006-480-029-000 $329.40
28 006-470-030-000 $329.40 63 006-480-030-000 $329.40
29 006-470-031-000 $329.40 64 006-480-032-000 $329.40
30 006-470-032-000 $329.40 65 006-480-033-000 $329.40
31 006-470-033-000 $329.40 66 006-480-034-000 $329.40
32 006-470-034-000 $329.40 67 006-480-035-000 $329.40
33 006-470-035-000 $329.40 68 006-480-036-000 $329.40
34 006-480-001-000 $329.40 69 006-480-037-000 $329.40
35 006-480-002-000 $329.40 70 006-480-038-000 $329.40
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 006-480-039-000 $329.40
72 006-480-040-000 $329.40
73 006-480-041-000 $329.40
74 006-480-042-000 $329.40
75 006-480-043-000 $329.40
76 006-480-044-000 $329.40
77 006-480-045-000 $329.40
78 006-480-046-000 $329.40
79 006-480-047-000 $329.40
TOTAL $26,022.60
1. BEGINNING FUND BALANCE $ (2,633.95)
2. LANDSCAPE MAINTENANCE COSTS $ 5,096.09
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 381.33
b. ENGINEERING ADMINISTRATION $ 209.95
c. LEGAL ADMINISTRATION $ 44.80
d. FINANCE ADMINISTRATION $ 31.15
e. TREE TRIMMING $ 225.00
f. GAS & UTILITIES $ 1,904.99
g. EQUIPMENT g. 212.75
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 122.72
i. MADERA COUNTY PROCESSING FEES $ 59.84
TOTAL COSTS: $ 8,288.61
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (4,969.57)
5. TOTAL ASSESSMENT $ 5,952.31
6. AVERAGE ASSESSMENT PER PARCEL 87.54
CITY OF MADERA
ZONE 13
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-310-001-000 $87.53 26 011-310-027-000 $87.53
2 011-310-002-000 $87.53 27 011-310-028-000 $87.53
3 011-310-003-000 $87.53 28 011-310-029-000 $87.53
4 011-310-004-000 $87.53 29 011-310-030-000 $87.53
5 011-310-005-000 $87.53 30 011-310-031-000 $87.53
6 011-310-006-000 $87.53 31 011-310-032-000 $87.53
7 011-310-007-000 $87.53 32 011-310-033-000 $87.53
8 011-310-008-000 $87.53 33 011-310-034-000 $87.53
9 011-310-009-000 $87.53 34 011-310-035-000 $87.53
10 011-310-010-000 $87.53 35 011-310-036-000 $87.53
11 011-310-011-000 $87.53 36 011-310-037-000 $87.53
12 011-310-012-000 $87.53 37 011-310-038-000 $87.53
13 011-310-013-000 $87.53 38 011-310-039-000 $87.53
14 011-310-014-000 $87.53 39 011-310-040-000 $87.53
15 011-310-015-000 $87.53 40 011-310-041-000 $87.53
16 011-310-016-000 $87.53 41 011-310-042-000 $87.53
17 011-310-017-000 $87.53 42 011-310-043-000 $87.53
18 011-310-018-000 $87.53 43 011-310-044-000 $87.53
19 011-310-019-000 $87.53 44 011-310-045-000 $87.53
20 011-310-020-000 $87.53 45 011-310-046-000 $87.53
21 011-310-021-000 $87.53 46 011-310-047-000 $87.53
22 011-310-022-000 $87.53 47 011-310-048-000 $87.53
23 011-310-024-000 $87.53 48 011-310-049-000 $87.53
24 011-310-025-000 $87.53 49 011-310-055-000 $87.53
25 011-310-026-000 $87.53 50 011-310-056-000 $87.53
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$5,952.31
LANDSCAPE MAINTENANCE DISTRICT
ZONE 13 - LAS PALMAS ESTATES 1, 2, 3, & 4
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
51 011-310-057-000 $87.53
52 011-310-058-000 $87.53
53 011-310-059-000 $87.53
54 011-310-060-000 $87.53
55 011-310-061-000 $87.53
56 011-310-062-000 $87.53
57 011-310-063-000 $87.53
58 011-310-068-000 $87.53
59 011-310-069-000 $87.53
60 011-310-070-000 $87.53
61 011-310-071-000 $87.53
62 011-310-072-000 $87.53
63 011-310-073-000 $87.53
64 011-310-074-000 $87.53
65 011-310-075-000 $87.53
66 011-310-076-000 $87.53
67 011-310-077-000 $87.53
68 011-310-078-000 $87.53
TOTAL $5,952.31
.
1. BEGINNING FUND BALANCE $ 165.56
2. LANDSCAPE MAINTENANCE COSTS $ 1,812.32
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 301.43
b. ENGINEERING ADMINISTRATION $ 338.06
c. LEGAL ADMINISTRATION $ 72.14
d. FINANCE ADMINISTRATION $ 50.15
e. TREE TRIMMING $ 540.00
f. GAS & UTILITIES $ 195.95
g. EQUIPMENT g. 165.19
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 50.40
i. MADERA COUNTY PROCESSING FEES $ 101.20
TOTAL COSTS: $ 3,626.86
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (510.40)
5. TOTAL ASSESSMENT $ 2,950.90
6. AVERAGE ASSESSMENT PER PARCEL 25.66
CITY OF MADERA
ZONE 14
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-380-001-000 $25.66 36 012-380-036-000 $25.66
2 012-380-002-000 $25.66 37 012-380-037-000 $25.66
3 012-380-003-000 $25.66 38 012-380-038-000 $25.66
4 012-380-004-000 $25.66 39 012-380-039-000 $25.66
5 012-380-005-000 $25.66 40 012-380-040-000 $25.66
6 012-380-006-000 $25.66 41 012-380-041-000 $25.66
7 012-380-007-000 $25.66 42 012-380-042-000 $25.66
8 012-380-008-000 $25.66 43 012-380-043-000 $25.66
9 012-380-009-000 $25.66 44 012-380-044-000 $25.66
10 012-380-010-000 $25.66 45 012-380-045-000 $25.66
11 012-380-011-000 $25.66 46 012-380-046-000 $25.66
12 012-380-012-000 $25.66 47 012-380-047-000 $25.66
13 012-380-013-000 $25.66 48 012-380-048-000 $25.66
14 012-380-014-000 $25.66 49 012-380-049-000 $25.66
15 012-380-015-000 $25.66 50 012-380-050-000 $25.66
16 012-380-016-000 $25.66 51 012-380-051-000 $25.66
17 012-380-017-000 $25.66 52 012-380-052-000 $25.66
18 012-380-018-000 $25.66 53 012-380-053-000 $25.66
19 012-380-019-000 $25.66 54 012-381-001-000 $25.66
20 012-380-020-000 $25.66 55 012-381-002-000 $25.66
21 012-380-021-000 $25.66 56 012-381-003-000 $25.66
22 012-380-022-000 $25.66 57 012-381-004-000 $25.66
23 012-380-023-000 $25.66 58 012-381-005-000 $25.66
24 012-380-024-000 $25.66 59 012-381-006-000 $25.66
25 012-380-025-000 $25.66 60 012-381-007-000 $25.66
26 012-380-026-000 $25.66 61 012-381-008-000 $25.66
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 14 - CAPISTRANO 1 & 2
TOTAL ASSESSMENT:
$2,950.90
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 012-380-027-000 $25.66 62 012-381-009-000 $25.66
28 012-380-028-000 $25.66 63 012-381-010-000 $25.66
29 012-380-029-000 $25.66 64 012-381-011-000 $25.66
30 012-380-030-000 $25.66 65 012-381-012-000 $25.66
31 012-380-031-000 $25.66 66 012-381-013-000 $25.66
32 012-380-032-000 $25.66 67 012-381-014-000 $25.66
33 012-380-033-000 $25.66 68 012-381-015-000 $25.66
34 012-380-034-000 $25.66 69 012-381-016-000 $25.66
35 012-380-035-000 $25.66 70 012-381-017-000 $25.66
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 012-381-018-000 $25.66
72 012-381-019-000 $25.66
73 012-381-020-000 $25.66
74 012-381-021-000 $25.66
75 012-381-022-000 $25.66
76 012-381-023-000 $25.66
77 012-381-024-000 $25.66
78 012-381-025-000 $25.66
79 012-381-026-000 $25.66
80 012-381-027-000 $25.66
81 012-381-028-000 $25.66
82 012-381-029-000 $25.66
83 012-381-030-000 $25.66
84 012-381-031-000 $25.66
85 012-381-032-000 $25.66
86 012-381-033-000 $25.66
87 012-381-034-000 $25.66
88 012-381-035-000 $25.66
89 012-381-036-000 $25.66
90 012-381-037-000 $25.66
91 012-381-038-000 $25.66
92 012-381-039-000 $25.66
93 012-381-040-000 $25.66
94 012-381-041-000 $25.66
95 012-381-042-000 $25.66
96 012-381-043-000 $25.66
97 012-381-044-000 $25.66
98 012-381-045-000 $25.66
99 012-381-046-000 $25.66
100 012-381-047-000 $25.66
101 012-381-048-000 $25.66
102 012-381-049-000 $25.66
103 012-381-050-000 $25.66
104 012-381-051-000 $25.66
105 012-381-052-000 $25.66
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
106 012-381-053-000 $25.66
107 012-381-054-000 $25.66
108 012-381-055-000 $25.66
109 012-381-056-000 $25.66
110 012-381-057-000 $25.66
111 012-381-058-000 $25.66
112 012-381-059-000 $25.66
113 012-381-060-000 $25.66
114 012-381-061-000 $25.66
115 012-381-062-000 $25.66
TOTAL $2,950.90
.
1. BEGINNING FUND BALANCE $ 7,082.36
2. LANDSCAPE MAINTENANCE COSTS $ 728.13
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 258.73
b. ENGINEERING ADMINISTRATION $ 76.39
c. LEGAL ADMINISTRATION $ 16.30
d. FINANCE ADMINISTRATION $ 11.33
e. TREE TRIMMING $ 0.00
f. GAS & UTILITIES $ 242.59
g. EQUIPMENT g. 182.38
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 91.72
i. MADERA COUNTY PROCESSING FEES $ 16.72
TOTAL COSTS: $ 1,624.28
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 9,053.26
5. TOTAL ASSESSMENT $ 3,595.14
6. AVERAGE ASSESSMENT PER PARCEL 189.22
CITY OF MADERA
ZONE 15
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-082-027-000 $189.22
2 008-082-028-000 $189.22
3 008-082-029-000 $189.22
4 008-082-030-000 $189.22
5 008-082-031-000 $189.22
6 008-082-032-000 $189.22
7 008-082-033-000 $189.22
8 008-082-034-000 $189.22
9 008-082-035-000 $189.22
10 008-082-036-000 $189.22
11 008-082-037-000 $189.22
12 008-082-038-000 $189.22
13 008-082-039-000 $189.22
14 008-082-040-000 $189.22
15 008-082-041-000 $189.22
16 008-082-042-000 $189.22
17 008-082-043-000 $189.22
18 008-082-044-000 $189.22
19 008-082-045-000 $189.22
Total $3,595.14
ZONE 15 - CLINTON / ELM RANCHOS 1
TOTAL ASSESSMENT:
$3,595.14
LANDSCAPE MAINTENANCE DISTRICT
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
.
1. BEGINNING FUND BALANCE $ (675.78)
2. LANDSCAPE MAINTENANCE COSTS $ 429.01
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 258.73
b. ENGINEERING ADMINISTRATION $ 51.86
c. LEGAL ADMINISTRATION $ 11.07
d. FINANCE ADMINISTRATION $ 7.69
e. TREE TRIMMING $ 0.00
f. GAS & UTILITIES $ 33.24
g. EQUIPMENT g. 19.20
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 48.29
I. MADERA COUNTY PROCESSING FEES $ 8.80
TOTAL COSTS: $ 867.88
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (1,263.67)
5. TOTAL ASSESSMENT $ 280.00
6. AVERAGE ASSESSMENT PER PARCEL 28.00
CITY OF MADERA
ZONE 15B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-082-046-000 $28.00
2 008-082-047-000 $28.00
3 008-082-048-000 $28.00
4 008-082-049-000 $28.00
5 008-082-050-000 $28.00
6 008-082-051-000 $28.00
7 008-082-052-000 $28.00
8 008-082-053-000 $28.00
9 008-082-054-000 $28.00
10 008-082-055-000 $28.00
TOTAL $280.00
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$280.00
LANDSCAPE MAINTENANCE DISTRICT
ZONE 15B - CLINTON / ELM RANCHOS 2
TOTAL ASSESSMENT:
.
1. BEGINNING FUND BALANCE $ 51.98
2. LANDSCAPE MAINTENANCE COSTS $ 385.42
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 258.73
b. ENGINEERING ADMINISTRATION $ 54.59
c. LEGAL ADMINISTRATION $ 11.65
d. FINANCE ADMINISTRATION $ 8.10
e. TREE TRIMMING $ 0.00
f. GAS & UTILITIES $ 33.24
g. EQUIPMENT g. 21.12
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 53.11
i. MADERA COUNTY PROCESSING FEES $ 9.68
TOTAL COSTS: $ 835.62
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (31.25)
5. TOTAL ASSESSMENT $ 752.33
6. AVERAGE ASSESSMENT PER PARCEL 68.40
CITY OF MADERA
ZONE 15C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-082-058-000 $68.39
2 008-082-059-000 $68.39
3 008-082-060-000 $68.39
4 008-082-061-000 $68.39
5 008-082-062-000 $68.39
6 008-082-063-000 $68.39
7 008-082-064-000 $68.39
8 008-082-065-000 $68.39
9 008-082-066-000 $68.39
10 008-082-067-000 $68.39
11 008-082-068-000 $68.39
TOTAL $752.33
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 15C - CLINTON / ELM RANCHOS 3
TOTAL ASSESSMENT:
$752.33
.
1. BEGINNING FUND BALANCE $ (530.26)
2. LANDSCAPE MAINTENANCE COSTS $ 2,740.75
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 309.40
b. ENGINEERING ADMINISTRATION $ 90.02
c. LEGAL ADMINISTRATION $ 19.21
d. FINANCE ADMINISTRATION $ 13.35
e. TREE TRIMMING $ 630.00
f. GAS & UTILITIES $ 393.45
g. EQUIPMENT g. 193.41
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 1,131.99
I. MADERA COUNTY PROCESSING FEES $ 21.12
TOTAL COSTS: $ 5,542.70
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (1,713.12)
5. TOTAL ASSESSMENT $ 4,359.84
6. AVERAGE ASSESSMENT PER PARCEL 181.66
CITY OF MADERA
ZONE 16
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-093-001-000 $181.66
2 008-093-002-000 $181.66
3 008-093-003-000 $181.66
4 008-093-004-000 $181.66
5 008-093-005-000 $181.66
6 008-093-006-000 $181.66
7 008-093-007-000 $181.66
8 008-093-008-000 $181.66
9 008-093-009-000 $181.66
10 008-093-010-000 $181.66
11 008-093-011-000 $181.66
12 008-093-012-000 $181.66
13 008-093-013-000 $181.66
14 008-093-014-000 $181.66
15 008-093-015-000 $181.66
16 008-093-016-000 $181.66
17 008-093-017-000 $181.66
18 008-093-018-000 $181.66
19 008-093-019-000 $181.66
20 008-093-020-000 $181.66
21 008-093-021-000 $181.66
22 008-093-022-000 $181.66
23 008-093-023-000 $181.66
24 008-093-024-000 $181.66
TOTAL $4,359.84
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 16 - SUGAR PINE
TOTAL ASSESSMENT:
$4,359.84
.
1. BEGINNING FUND BALANCE $ (1,165.70)
2. LANDSCAPE MAINTENANCE COSTS $ 10,470.73
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 312.84
b. ENGINEERING ADMINISTRATION $ 291.72
c. LEGAL ADMINISTRATION $ 62.25
d. FINANCE ADMINISTRATION $ 43.28
e. TREE TRIMMING $ 675.00
f. GAS & UTILITIES $ 239.40
g. EQUIPMENT g. 296.58
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 115.20
I. MADERA COUNTY PROCESSING FEES $ 86.24
TOTAL COSTS: $ 12,593.24
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (7,107.09)
5. TOTAL ASSESSMENT $ 6,650.87
6. AVERAGE ASSESSMENT PER PARCEL 67.88
CITY OF MADERA
ZONE 17A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-450-011-000 $67.87 36 009-450-049-000 $67.87
2 009-450-012-000 $67.87 37 009-450-050-000 $67.87
3 009-450-013-000 $67.87 38 009-450-051-000 $67.87
4 009-450-014-000 $67.87 39 009-450-052-000 $67.87
5 009-450-015-000 $67.87 40 009-450-053-000 $67.87
6 009-450-016-000 $67.87 41 009-451-001-000 $67.87
7 009-450-017-000 $67.87 42 009-451-002-000 $67.87
8 009-450-018-000 $67.87 43 009-451-003-000 $67.87
9 009-450-019-000 $67.87 44 009-451-004-000 $67.87
10 009-450-020-000 $67.87 45 009-451-005-000 $67.87
11 009-450-021-000 $67.87 46 009-451-006-000 $67.87
12 009-450-022-000 $67.87 47 009-451-007-000 $67.87
13 009-450-023-000 $67.87 48 009-451-008-000 $67.87
14 009-450-024-000 $67.87 49 009-451-009-000 $67.87
15 009-450-025-000 $67.87 50 009-451-010-000 $67.87
16 009-450-026-000 $67.87 51 009-451-011-000 $67.87
17 009-450-027-000 $67.87 52 009-451-012-000 $67.87
18 009-450-028-000 $67.87 53 009-451-013-000 $67.87
19 009-450-029-000 $67.87 54 009-451-014-000 $67.87
20 009-450-030-000 $67.87 55 009-451-015-000 $67.87
21 009-450-031-000 $67.87 56 009-451-016-000 $67.87
22 009-450-032-000 $67.87 57 009-451-017-000 $67.87
23 009-450-033-000 $67.87 58 009-451-018-000 $67.87
24 009-450-034-000 $67.87 59 009-451-019-000 $67.87
25 009-450-035-000 $67.87 60 009-451-020-000 $67.87
26 009-450-036-000 $67.87 61 009-451-021-000 $67.87
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 17A - CAPISTRANO X, PHASE 1 & 2
TOTAL ASSESSMENT:
$6,650.87
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 009-450-037-000 $67.87 62 009-451-022-000 $67.87
28 009-450-038-000 $67.87 63 009-451-023-000 $67.87
29 009-450-039-000 $67.87 64 009-451-024-000 $67.87
30 009-450-040-000 $67.87 65 009-451-025-000 $67.87
31 009-450-044-000 $67.87 66 009-451-026-000 $67.87
32 009-450-045-000 $67.87 67 009-451-027-000 $67.87
33 009-450-046-000 $67.87 68 009-451-028-000 $67.87
34 009-450-047-000 $67.87 69 009-451-029-000 $67.87
35 009-450-048-000 $67.87 70 009-451-030-000 $67.87
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 009-451-031-000 $67.87
72 009-451-032-000 $67.87
73 009-451-033-000 $67.87
74 009-520-001-000 $67.87
75 009-520-002-000 $67.87
76 009-520-003-000 $67.87
77 009-520-004-000 $67.87
78 009-520-005-000 $67.87
79 009-520-006-000 $67.87
80 009-520-007-000 $67.87
81 009-520-008-000 $67.87
82 009-520-009-000 $67.87
83 009-520-010-000 $67.87
84 009-520-011-000 $67.87
85 009-520-012-000 $67.87
86 009-520-013-000 $67.87
87 009-520-014-000 $67.87
88 009-520-015-000 $67.87
89 009-520-016-000 $67.87
90 009-520-017-000 $67.87
91 009-520-018-000 $67.87
92 009-520-019-000 $67.87
93 009-520-020-000 $67.87
94 009-520-021-000 $67.87
95 009-520-022-000 $67.87
96 009-520-023-000 $67.87
97 009-520-024-000 $67.87
98 009-520-025-000 $67.87
Total $6,650.87
.
1. BEGINNING FUND BALANCE $ 5,630.35
2. LANDSCAPE MAINTENANCE COSTS $ 1,891.82
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 264.01
b. ENGINEERING ADMINISTRATION $ 111.83
c. LEGAL ADMINISTRATION $ 23.86
d. FINANCE ADMINISTRATION $ 16.59
e. TREE TRIMMING $ 1,193.00
f. GAS & UTILITIES $ 53.37
g. EQUIPMENT g. 89.54
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 17.90
I. MADERA COUNTY PROCESSING FEES $ 28.16
TOTAL COSTS: $ 3,690.08
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 4,261.85
5. TOTAL ASSESSMENT $ 2,321.59
6. AVERAGE ASSESSMENT PER PARCEL 72.55
CITY OF MADERA
ZONE 17B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-470-001-000 $72.55
2 009-470-002-000 $72.55
3 009-470-003-000 $72.55
4 009-470-004-000 $72.55
5 009-470-005-000 $72.55
6 009-470-006-000 $72.55
7 009-470-007-000 $72.55
8 009-470-008-000 $72.55
9 009-470-009-000 $72.55
10 009-470-010-000 $72.55
11 009-470-011-000 $72.55
12 009-470-012-000 $72.55
13 009-470-013-000 $72.55
14 009-470-014-000 $72.55
15 009-470-015-000 $72.55
16 009-470-016-000 $72.55
17 009-470-017-000 $72.55
18 009-470-018-000 $72.55
19 009-470-019-000 $72.55
20 009-470-020-000 $72.55
21 009-470-021-000 $72.55
22 009-470-022-000 $72.55
23 009-470-023-000 $72.55
24 009-470-024-000 $72.55
25 009-470-025-000 $72.55
26 009-470-026-000 $72.55
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 17B - CAPISTRANO X, PHASE 3
TOTAL ASSESSMENT:
$2,321.59
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 009-470-027-000 $72.55
28 009-470-028-000 $72.55
29 009-470-029-000 $72.55
30 009-470-030-000 $72.55
31 009-470-031-000 $72.55
32 009-470-032-000 $72.55
TOTAL $2,321.59
.
1. BEGINNING FUND BALANCE $ 508.29
2. LANDSCAPE MAINTENANCE COSTS $ 4,496.36
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 286.02
b. ENGINEERING ADMINISTRATION $ 120.00
c. LEGAL ADMINISTRATION $ 25.61
d. FINANCE ADMINISTRATION $ 17.80
e. TREE TRIMMING $ 540.00
f. GAS & UTILITIES $ 137.24
g. EQUIPMENT g. 121.61
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 42.52
i. MADERA COUNTY PROCESSING FEES $ 30.80
TOTAL COSTS: $ 5,817.97
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (2,270.28)
5. TOTAL ASSESSMENT $ 3,039.40
6. AVERAGE ASSESSMENT PER PARCEL 86.84
CITY OF MADERA
ZONE 17C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-480-001-000 $86.84
2 009-480-002-000 $86.84
3 009-480-003-000 $86.84
4 009-480-004-000 $86.84
5 009-480-005-000 $86.84
6 009-480-006-000 $86.84
7 009-480-007-000 $86.84
8 009-480-008-000 $86.84
9 009-480-009-000 $86.84
10 009-480-010-000 $86.84
11 009-480-011-000 $86.84
12 009-480-012-000 $86.84
13 009-480-013-000 $86.84
14 009-480-014-000 $86.84
15 009-480-015-000 $86.84
16 009-480-016-000 $86.84
17 009-480-017-000 $86.84
18 009-480-018-000 $86.84
19 009-480-019-000 $86.84
20 009-480-020-000 $86.84
21 009-480-021-000 $86.84
22 009-480-022-000 $86.84
23 009-480-023-000 $86.84
24 009-480-024-000 $86.84
25 009-480-025-000 $86.84
26 009-480-026-000 $86.84
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 17C - CAPISTRANO X, PHASE 4
TOTAL ASSESSMENT:
$3,039.40
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 009-480-027-000 $86.84
28 009-480-028-000 $86.84
29 009-480-029-000 $86.84
30 009-480-030-000 $86.84
31 009-480-031-000 $86.84
32 009-480-032-000 $86.84
33 009-480-033-000 $86.84
34 009-480-034-000 $86.84
35 009-480-035-000 $86.84
TOTAL $3,039.40
.
1. BEGINNING FUND BALANCE $ (1,634.74)
2. LANDSCAPE MAINTENANCE COSTS $ 2,660.38
3 INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 264.01
b. ENGINEERING ADMINISTRATION $ 147.26
c. LEGAL ADMINISTRATION $ 31.42
d. FINANCE ADMINISTRATION $ 21.85
e. TREE TRIMMING $ 698.00
f. GAS & UTILITIES $ 53.37
g. EQUIPMENT g. 71.95
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 25.17
i. MADERA COUNTY PROCESSING FEES $ 39.60
TOTAL COSTS: $ 4,013.01
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (3,490.61)
5. TOTAL ASSESSMENT $ 2,157.14
6. AVERAGE ASSESSMENT PER PARCEL 47.94
CITY OF MADERA
ZONE 17D
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-490-001-000 $47.94 36 009-490-040-000 $47.94
2 009-490-002-000 $47.94 37 009-490-041-000 $47.94
3 009-490-003-000 $47.94 38 009-490-042-000 $47.94
4 009-490-004-000 $47.94 39 009-490-043-000 $47.94
5 009-490-005-000 $47.94 40 009-490-044-000 $47.94
6 009-490-006-000 $47.94 41 009-490-045-000 $47.94
7 009-490-063-000 $47.94 42 009-490-058-000 $47.94
8 009-490-009-000 $47.94 43 009-490-048-000 $47.94
9 009-490-010-000 $47.94 44 009-490-049-000 $47.94
10 009-490-011-000 $47.94 45 009-490-050-000 $47.94
11 009-490-012-000 $47.94 TOTAL $2,157.14
12 009-490-013-000 $47.94
13 009-490-014-000 $47.94
14 009-490-015-000 $47.94
15 009-490-016-000 $47.94
16 009-490-057-000 $47.94
17 009-490-019-000 $47.94
18 009-490-020-000 $47.94
19 009-490-021-000 $47.94
20 009-490-022-000 $47.94
21 009-490-023-000 $47.94
22 009-490-024-000 $47.94
23 009-490-025-000 $47.94
24 009-490-026-000 $47.94
25 009-490-060-000 $47.94
26 009-490-059-000 $47.94
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 17D - CAPISTRANO XI, PHASE 1
TOTAL ASSESSMENT:
$2,157.14
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 009-490-031-000 $47.94
28 009-490-032-000 $47.94
29 009-490-033-000 $47.94
30 009-490-034-000 $47.94
31 009-490-035-000 $47.94
32 009-490-036-000 $47.94
33 009-490-037-000 $47.94
34 009-490-038-000 $47.94
35 009-490-039-000 $47.94
.
1. BEGINNING FUND BALANCE $ 3,070.30
2. LANDSCAPE MAINTENANCE COSTS $ 1,418.34
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 441.26
b. ENGINEERING ADMINISTRATION $ 171.79
c. LEGAL ADMINISTRATION $ 36.66
d. FINANCE ADMINISTRATION $ 25.49
e. TREE TRIMMING $ 923.00
f. GAS & UTILITIES $ 377.41
g. EQUIPMENT g. 80.12
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 81.82
i. MADERA COUNTY PROCESSING FEES $ 47.52
TOTAL COSTS: $ 3,603.40
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 3,187.72
5. TOTAL ASSESSMENT $ 3,720.82
6. AVERAGE ASSESSMENT PER PARCEL 68.90
CITY OF MADERA
ZONE 18
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-451-001-000 $68.90 36 006-452-018-000 $68.90
2 006-451-002-000 $68.90 37 006-453-001-000 $68.90
3 006-451-003-000 $68.90 38 006-453-002-000 $68.90
4 006-451-004-000 $68.90 39 006-453-003-000 $68.90
5 006-451-005-000 $68.90 40 006-453-004-000 $68.90
6 006-451-006-000 $68.90 41 006-453-005-000 $68.90
7 006-451-007-000 $68.90 42 006-453-006-000 $68.90
8 006-451-008-000 $68.90 43 006-453-007-000 $68.90
9 006-451-009-000 $68.90 44 006-453-008-000 $68.90
10 006-451-010-000 $68.90 45 006-453-009-000 $68.90
11 006-451-011-000 $68.90 46 006-453-010-000 $68.90
12 006-451-012-000 $68.90 47 006-453-011-000 $68.90
13 006-451-013-000 $68.90 48 006-453-012-000 $68.90
14 006-451-014-000 $68.90 49 006-453-013-000 $68.90
15 006-451-015-000 $68.90 50 006-453-014-000 $68.90
16 006-451-016-000 $68.90 51 006-453-015-000 $68.90
17 006-451-017-000 $68.90 52 006-453-016-000 $68.90
18 006-451-018-000 $68.90 53 006-453-017-000 $68.90
19 006-452-001-000 $68.90 54 006-453-018-000 $68.90
20 006-452-002-000 $68.90
TOTAL $3,720.82
21 006-452-003-000 $68.90
22 006-452-004-000 $68.90
23 006-452-005-000 $68.90
24 006-452-006-000 $68.90
25 006-452-007-000 $68.90
26 006-452-008-000 $68.90
LANDSCAPE MAINTENANCE DISTRICT
ZONE 18 - LINCOLN PLACE, PHASE 1, 2, & 3
TOTAL ASSESSMENT:
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$3,720.82
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 006-452-009-000 $68.90
28 006-452-010-000 $68.90
29 006-452-011-000 $68.90
30 006-452-012-000 $68.90
31 006-452-013-000 $68.90
32 006-452-014-000 $68.90
33 006-452-015-000 $68.90
34 006-452-016-000 $68.90
35 006-452-017-000 $68.90
.
1. BEGINNING FUND BALANCE $ 1,142.00
2. LANDSCAPE MAINTENANCE COSTS $ 486.48
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 255.50
b. ENGINEERING ADMINISTRATION $ 109.10
c. LEGAL ADMINISTRATION $ 23.28
d. FINANCE ADMINISTRATION $ 16.19
e. TREE TRIMMING $ 68.00
f. GAS & UTILITIES $ 20.95
g. EQUIPMENT g. 49.60
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 96.80
i. MADERA COUNTY PROCESSING FEES $ 27.28
TOTAL COSTS: $ 1,153.18
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 1,019.12
5. TOTAL ASSESSMENT $ 1,029.99
6. AVERAGE ASSESSMENT PER PARCEL 33.24
CITY OF MADERA
ZONE 20A
2024-25
Assessment Assessor’s Parcel
Number Number Assessment
1 005-251-001-000 $33.23
2 005-251-002-000 $33.23
3 005-251-003-000 $33.23
4 005-251-004-000 $33.23
5 005-251-005-000 $33.23
6 005-251-006-000 $33.23
7 005-251-007-000 $33.23
8 005-251-008-000 $33.23
9 005-251-009-000 $33.23
10 005-251-010-000 $33.23
11 005-251-011-000 $33.23
12 005-251-012-000 $33.23
13 005-251-013-000 $33.23
14 005-251-014-000 $33.23
15 005-251-015-000 $33.23
16 005-251-016-000 $33.23
17 005-251-017-000 $33.23
18 005-140-051-000 $33.23
19 005-140-052-000 $33.23
20 005-140-053-000 $33.23
21 005-140-054-000 $33.23
22 005-140-055-000 $33.23
23 005-140-056-000 $33.23
24 005-140-057-000 $33.23
25 005-140-058-000 $33.23
26 005-140-059-000 $33.23
27 005-140-060-000 $33.23
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 20A - LA JOLLA ESTATES, PHASE 1
TOTAL ASSESSMENT:
$1,029.99
Assessment Assessor’s Parcel
Number Number Assessment
28 005-140-061-000 $33.23
29 005-140-062-000 $33.23
30 005-140-063-000 $33.23
31 005-140-064-000 $33.23
$1,029.99
.
1. BEGINNING FUND BALANCE $ (2,060.56)
2. LANDSCAPE MAINTENANCE COSTS $ 1,012.37
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 263.35
b. ENGINEERING ADMINISTRATION $ 109.10
c. LEGAL ADMINISTRATION $ 23.28
d. FINANCE ADMINISTRATION $ 16.19
e. TREE TRIMMING $ 180.00
f. GAS & UTILITIES $ 189.84
g. EQUIPMENT g. 67.69
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 21.69
i. MADERA COUNTY PROCESSING FEES $ 27.28
TOTAL COSTS: $ 1,910.78
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (3,971.34)
5. TOTAL ASSESSMENT $ 0.00
6. AVERAGE ASSESSMENT PER PARCEL 0.00
CITY OF MADERA
ZONE 20B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-250-038-000 $0.00
2 005-250-039-000 $0.00
3 005-250-040-000 $0.00
4 005-250-041-000 $0.00
5 005-250-042-000 $0.00
6 005-250-043-000 $0.00
7 005-250-044-000 $0.00
8 005-250-045-000 $0.00
9 005-250-046-000 $0.00
10 005-250-047-000 $0.00
11 005-250-048-000 $0.00
12 005-250-049-000 $0.00
13 005-250-050-000 $0.00
14 005-250-051-000 $0.00
15 005-250-052-000 $0.00
16 005-250-053-000 $0.00
17 005-250-054-000 $0.00
18 005-250-055-000 $0.00
19 005-250-056-000 $0.00
20 005-250-057-000 $0.00
21 005-250-058-000 $0.00
22 005-250-059-000 $0.00
23 005-250-060-000 $0.00
24 005-250-061-000 $0.00
25 005-250-062-000 $0.00
26 005-250-063-000 $0.00
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 20B - LA JOLLA ESTATES, PHASE 2
TOTAL ASSESSMENT:
$0.00
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
27 005-250-064-000 $0.00
28 005-250-065-000 $0.00
29 005-250-066-000 $0.00
30 005-250-067-000 $0.00
31 005-250-068-000 $0.00
TOTAL $0.00
.
1. BEGINNING FUND BALANCE $ 48.21
2. LANDSCAPE MAINTENANCE COSTS $ 720.01
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 254.76
b. ENGINEERING ADMINISTRATION $ 68.21
c. LEGAL ADMINISTRATION $ 14.56
d. FINANCE ADMINISTRATION $ 10.12
e. TREE TRIMMING $ 68.00
f. GAS & UTILITIES $ 18.14
g. EQUIPMENT g. 54.52
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 12.82
i. MADERA COUNTY PROCESSING FEES $ 14.08
TOTAL COSTS: $ 1,235.23
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 113.70
5. TOTAL ASSESSMENT $ 1,300.72
6. AVERAGE ASSESSMENT PER PARCEL 81.29
CITY OF MADERA
ZONE 20C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-250-071-000 $81.29
2 005-250-072-000 $81.29
3 005-250-073-000 $81.29
4 005-250-074-000 $81.29
5 005-250-075-000 $81.29
6 005-250-076-000 $81.29
7 005-250-077-000 $81.29
8 005-250-078-000 $81.29
9 005-250-079-000 $81.29
10 005-250-080-000 $81.29
11 005-250-081-000 $81.29
12 005-250-082-000 $81.29
13 005-250-083-000 $81.29
14 005-250-084-000 $81.29
15 005-250-085-000 $81.29
16 005-250-086-000 $81.29
TOTAL $1,300.72
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 20C - LA JOLLA ESTATES, PHASE 3
TOTAL ASSESSMENT:
$1,300.72
LANDSCAPE MAINTENANCE DISTRICT
.
1. BEGINNING FUND BALANCE $ (10,013.41)
2. LANDSCAPE MAINTENANCE COSTS $ 7,051.94
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 366.75
b. ENGINEERING ADMINISTRATION $ 136.36
c. LEGAL ADMINISTRATION $ 29.10
d. FINANCE ADMINISTRATION $ 20.23
e. TREE TRIMMING $ 1,710.00
f. GAS & UTILITIES $ 390.73
g. EQUIPMENT g. 372.11
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 25.43
i. MADERA COUNTY PROCESSING FEES $ 36.08
TOTAL COSTS: $ 10,138.72
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (20,152.13)
5. TOTAL ASSESSMENT $ 0.00
6. AVERAGE ASSESSMENT PER PARCEL 0.00
CITY OF MADERA
ZONE 21
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-510-001-000 $0.00 36 006-510-057-000 $0.00
2 006-510-002-000 $0.00 37 006-510-058-000 $0.00
3 006-510-003-000 $0.00 38 006-510-059-000 $0.00
4 006-510-004-000 $0.00 39 006-510-060-000 $0.00
5 006-510-005-000 $0.00 43 006-510-064-000 $0.00
6 006-510-006-000 $0.00 44 006-510-065-000 $0.00
7 006-510-007-000 $0.00
8 006-510-008-000 $0.00 TOTAL $0.00
9 006-510-009-000 $0.00
10 006-510-010-000 $0.00
11 006-510-011-000 $0.00
12 006-510-012-000 $0.00
13 006-510-013-000 $0.00
14 006-510-014-000 $0.00
15 006-510-015-000 $0.00
16 006-510-016-000 $0.00
17 006-510-017-000 $0.00
18 006-510-018-000 $0.00
19 006-510-019-000 $0.00
20 006-510-022-000 $0.00
21 006-510-023-000 $0.00
22 006-510-024-000 $0.00
23 006-510-025-000 $0.00
24 006-510-044-000 $0.00
25 006-510-045-000 $0.00
26 006-510-047-000 $0.00
27 006-510-048-000 $0.00
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 21A - HOME RANCH PHASE I
TOTAL ASSESSMENT:
$0.00
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 006-510-049-000 $0.00
29 006-510-050-000 $0.00
30 006-510-051-000 $0.00
31 006-510-052-000 $0.00
32 006-510-053-000 $0.00
33 006-510-054-000 $0.00
34 006-510-055-000 $0.00
35 006-510-056-000 $0.00
1. BEGINNING FUND BALANCE $ 2,548.55
2. LANDSCAPE MAINTENANCE COSTS $ 2,243.78
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 283.47
b. ENGINEERING ADMINISTRATION $ 226.31
c. LEGAL ADMINISTRATION $ 48.29
d. FINANCE ADMINISTRATION $ 33.57
e. TREE TRIMMING $ 293.00
f. GAS & UTILITIES $ 127.53
g. EQUIPMENT g. 109.85
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 7.38
i. MADERA COUNTY PROCESSING FEES $ 65.12
TOTAL COSTS: $ 3,438.32
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 2,292.34
5. TOTAL ASSESSMENT $ 3,182.10
6. AVERAGE ASSESSMENT PER PARCEL 43.00
CITY OF MADERA
ZONE 21B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-510-061-000 $40.04 36 006-520-035-000 $40.04
2 006-510-062-000 $40.04 37 006-520-083-000 $88.42
3 006-510-063-000 $40.04 38 006-520-038-000 $40.04
4 006-520-086-000 $40.04 39 006-520-085-000 $88.42
5 006-520-087-000 $40.04 40 006-520-041-000 $40.04
6 006-520-003-000 $40.04 41 006-520-042-000 $40.04
7 006-520-004-000 $40.04 42 006-520-043-000 $40.04
8 006-520-005-000 $40.04 43 006-520-044-000 $40.04
9 006-520-006-000 $40.04 44 006-520-084-000 $88.42
10 006-520-007-000 $40.04 45 006-520-047-000 $40.04
11 006-520-008-000 $40.04 46 006-520-048-000 $40.04
12 006-520-009-000 $40.04 47 006-520-049-000 $40.04
13 006-520-010-000 $40.04 48 006-520-050-000 $40.04
14 006-520-011-000 $40.04 49 006-520-051-000 $40.04
15 006-520-012-000 $40.04 50 006-520-052-000 $40.04
16 006-520-013-000 $40.04 51 006-520-053-000 $40.04
17 006-520-014-000 $40.04 52 006-520-054-000 $40.04
18 006-520-015-000 $40.04 53 006-520-055-000 $40.04
19 006-520-016-000 $40.04 54 006-520-056-000 $40.04
20 006-520-017-000 $40.04 55 006-520-057-000 $40.04
21 006-520-018-000 $40.04 56 006-520-058-000 $40.04
22 006-520-019-000 $40.04 57 006-520-059-000 $40.04
23 006-520-020-000 $40.04 58 006-520-060-000 $40.04
24 006-520-021-000 $40.04 59 006-520-061-000 $40.04
25 006-520-022-000 $40.04 60 006-520-062-000 $40.04
26 006-520-023-000 $40.04 61 006-520-080-000 $58.94
27 006-520-024-000 $40.04 62 006-520-081-000 $58.94
28 006-520-025-000 $40.04 63 006-520-082-000 $58.94
29 006-520-027-000 $40.04 64 006-520-067-000 $40.04
30 006-520-026-000 $40.04 65 006-520-068-000 $40.04
31 006-520-079-000 $88.42 66 006-520-069-000 $40.04
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 21B - HOME RANCH PHASE II
TOTAL ASSESSMENT:
$3,182.10
32 006-520-030-000 $40.04 67 006-520-070-000 $40.04
33 006-520-077-000 $88.42 68 006-520-071-000 $40.04
34 006-520-033-000 $40.04 69 006-520-072-000 $40.04
35 006-520-034-000 $40.04 70 006-520-073-000 $40.04
71 006-520-074-000 $40.04
72 006-520-075-000 $40.04
TOTAL $3,181.48
.
1. BEGINNING FUND BALANCE $ 34,015.74
2. LANDSCAPE MAINTENANCE COSTS $ 9,963.56
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 404.08
b. ENGINEERING ADMINISTRATION $ 259.01
c. LEGAL ADMINISTRATION $ 55.27
d. FINANCE ADMINISTRATION $ 38.43
e. TREE TRIMMING $ 765.00
f. GAS & UTILITIES $ 587.04
g. EQUIPMENT g. 487.81
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 32.72
i. MADERA COUNTY PROCESSING FEES $ 75.68
TOTAL COSTS: $ 12,668.60
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 29,250.16
5. TOTAL ASSESSMENT $ 7,903.03
6. AVERAGE ASSESSMENT PER PARCEL 91.90
CITY OF MADERA
ZONE 21C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-562-001-000 $91.90 36 006-562-020-000 $91.90
2 006-562-002-000 $91.90 37 006-562-062-000 $91.90
3 006-562-003-000 $91.90 38 006-562-060-000 $91.90
4 006-562-063-000 $91.90 39 006-562-059-000 $91.90
5 006-561-001-000 $91.90 40 006-562-058-000 $91.90
6 006-561-002-000 $91.90 41 006-562-057-000 $91.90
7 006-561-003-000 $91.90 42 006-561-020-000 $91.90
8 006-561-004-000 $91.90 43 006-561-021-000 $91.90
9 006-561-005-000 $91.90 44 006-561-022-000 $91.90
10 006-561-006-000 $91.90 45 006-561-023-000 $91.90
11 006-561-007-000 $91.90 46 006-561-024-000 $91.90
12 006-561-008-000 $91.90 47 006-561-025-000 $91.90
13 006-561-009-000 $91.90 48 006-561-026-000 $91.90
14 006-561-010-000 $91.90 49 006-561-027-000 $91.90
15 006-561-011-000 $91.90 50 006-561-028-000 $91.90
16 006-561-012-000 $91.90 51 006-561-029-000 $91.90
17 006-561-013-000 $91.90 52 006-561-030-000 $91.90
18 006-561-014-000 $91.90 53 006-561-031-000 $91.90
19 006-561-015-000 $91.90 54 006-561-032-000 $91.90
20 006-562-006-000 $91.90 55 006-561-033-000 $91.90
21 006-562-007-000 $91.90 56 006-561-034-000 $91.90
22 006-562-008-000 $91.90 57 006-561-035-000 $91.90
23 006-562-009-000 $91.90 58 006-561-036-000 $91.90
24 006-562-010-000 $91.90 59 006-561-037-000 $91.90
25 006-562-011-000 $91.90 60 006-561-038-000 $91.90
26 006-562-012-000 $91.90 61 006-561-039-000 $91.90
27 006-562-013-000 $91.90 62 006-561-040-000 $91.90
ASSESSMENT ROLL
ZONE 21C - HOME RANCH PHASE III
TOTAL ASSESSMENT:
$7,903.03
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 006-562-064-000 $91.90 63 006-561-041-000 $91.90
29 006-561-043-000 $91.90 64 006-562-028-000 $91.90
30 006-561-018-000 $91.90 65 006-562-029-000 $91.90
31 006-561-019-000 $91.90 66 006-562-030-000 $91.90
32 006-562-016-000 $91.90 67 006-562-031-000 $91.90
33 006-562-017-000 $91.90 68 006-562-032-000 $91.90
34 006-562-018-000 $91.90 69 006-562-033-000 $91.90
35 006-562-019-000 $91.90 70 006-562-034-000 $91.90
71 006-562-035-000 $91.90
72 006-562-036-000 $91.90
73 006-562-037-000 $91.90
74 006-562-038-000 $91.90
75 006-562-039-000 $91.90
76 006-562-040-000 $91.90
77 006-562-041-000 $91.90
78 006-562-042-000 $91.90
79 006-562-043-000 $91.90
80 006-562-044-000 $91.90
81 006-562-045-000 $91.90
82 006-562-046-000 $91.90
83 006-562-047-000 $91.90
84 006-562-048-000 $91.90
85 006-562-049-000 $91.90
86 006-562-061-000 $91.90
TOTAL $7,903.03
.
1. BEGINNING FUND BALANCE $ 31,480.76
2. LANDSCAPE MAINTENANCE COSTS $ 4,965.54
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 378.83
b. ENGINEERING ADMINISTRATION $ 1,136.69
c. LEGAL ADMINISTRATION $ 242.55
d. FINANCE ADMINISTRATION $ 168.63
e. TREE TRIMMING $ 833.00
f. GAS & UTILITIES $ 348.39
g. EQUIPMENT $ 243.11
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 16.32
i. MADERA COUNTY PROCESSING FEES $ 359.04
TOTAL COSTS: $ 8,692.11
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 28,720.32
5. TOTAL ASSESSMENT $ 5,929.42
6. AVERAGE ASSESSMENT PER PARCEL 14.54
CITY OF MADERA
ZONE 21D
2024-25
Assessment Assessor’s Parcel
Number Number Assessment Developer Lot #
1 006-511-001-000 $14.53
2 006-511-002-000 $14.53
3 006-511-003-000 $14.53
4 006-511-004-000 $14.53
5 006-511-005-000 $14.53
6 006-511-006-000 $14.53
7 006-511-007-000 $14.53
8 006-511-008-000 $14.53
9 006-511-009-000 $14.53
10 006-511-010-000 $14.53
11 006-511-011-000 $14.53
12 006-511-012-000 $14.53
13 006-511-013-000 $14.53
14 006-511-014-000 $14.53
15 006-511-015-000 $14.53
16 006-511-016-000 $14.53
17 006-511-017-000 $14.53
18 006-511-018-000 $14.53
19 006-511-019-000 $14.53
20 006-511-020-000 $14.53
21 006-511-021-000 $14.53
22 006-511-022-000 $14.53
23 006-511-023-000 $14.53
24 006-511-024-000 $14.53
25 006-511-025-000 $14.53
26 006-511-026-000 $14.53
27 006-511-027-000 $14.53
28 006-511-028-000 $14.53
29 006-511-029-000 $14.53
30 006-511-030-000 $14.53
31 006-511-031-000 $14.53
32 006-511-032-000 $14.53
ZONE 21D
HOME RANCH PHASE IV, MELANIE MEADOWS PHASE I AND RANCHO SANTA FE TOTAL ASSESSMENT:
$5,929.42
ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
2024-25 ASSESSMENT ROLL
Assessment Assessor’s Parcel
Number Number Assessment Developer Lot #
33 006-511-033-000 $14.53
34 006-511-034-000 $14.53
35 006-511-035-000 $14.53
36 006-511-036-000 $14.53
37 006-511-037-000 $14.53
38 006-511-038-000 $14.53
39 006-511-039-000 $14.53
40 006-511-040-000 $14.53
41 006-511-041-000 $14.53
42 006-511-042-000 $14.53
43 006-511-043-000 $14.53
44 006-511-044-000 $14.53
45 006-511-045-000 $14.53
46 006-511-046-000 $14.53
47 006-511-047-000 $14.53
48 006-511-048-000 $14.53
49 006-511-049-000 $14.53
50 006-511-050-000 $14.53
51 006-511-051-000 $14.53
52 006-511-052-000 $14.53
53 006-511-053-000 $14.53
54 006-511-054-000 $14.53
55 006-590-001-000 $14.53 1
56 006-590-002-000 $14.53 2
57 006-590-003-000 $14.53 3
58 006-590-004-000 $14.53 4
59 006-590-005-000 $14.53 5
60 006-590-006-000 $14.53 6
61 006-590-007-000 $14.53 7
62 006-590-008-000 $14.53 8
63 006-590-009-000 $14.53 9
64 006-590-010-000 $14.53 10
65 006-590-011-000 $14.53 11
66 006-590-012-000 $14.53 12
67 006-590-013-000 $14.53 13
68 006-590-014-000 $14.53 14
69 006-590-015-000 $14.53 15
70 006-590-016-000 $14.53 16
71 006-590-017-000 $14.53 17
72 006-590-018-000 $14.53 18
73 006-590-019-000 $14.53 19
74 006-590-020-000 $14.53 20
75 006-590-021-000 $14.53 21
76 006-590-022-000 $14.53 22
Assessment Assessor’s Parcel
Number Number Assessment Developer Lot #
77 006-590-023-000 $14.53 23
78 006-590-024-000 $14.53 24
79 006-590-025-000 $14.53 25
80 006-590-026-000 $14.53 26
81 006-590-027-000 $14.53 27
82 006-590-028-000 $14.53 28
83 006-590-029-000 $14.53 29
84 006-590-030-000 $14.53 30
85 006-590-031-000 $14.53 31
86 006-590-032-000 $14.53 32
87 006-590-033-000 $14.53 33
88 006-590-034-000 $14.53 34
89 006-590-035-000 $14.53 35
90 006-590-036-000 $14.53 36
91 006-590-037-000 $14.53 37
92 006-590-038-000 $14.53 38
93 006-590-039-000 $14.53 39
94 006-590-040-000 $14.53 40
95 006-590-041-000 $14.53 41
96 006-590-042-000 $14.53 42
97 006-590-043-000 $14.53 43
98 006-590-044-000 $14.53 44
99 006-590-045-000 $14.53 45
100 006-590-046-000 $14.53 46
101 006-590-047-000 $14.53 47
102 006-590-048-000 $14.53 48
103 006-590-049-000 $14.53 49
104 006-590-050-000 $14.53 50
105 006-590-051-000 $14.53 51
106 006-590-052-000 $14.53 52
107 006-590-053-000 $14.53 53
108 006-590-054-000 $14.53 54
109 006-591-001-000 $14.53 55
110 006-591-002-000 $14.53 56
111 006-591-003-000 $14.53 57
112 006-591-004-000 $14.53 58
113 006-591-005-000 $14.53 59
114 006-591-006-000 $14.53 60
115 006-591-007-000 $14.53 61
116 006-591-008-000 $14.53 62
117 006-591-009-000 $14.53 63
118 006-591-010-000 $14.53 64
119 006-591-011-000 $14.53 65
120 006-591-012-000 $14.53 66
Assessment Assessor’s Parcel
Number Number Assessment Developer Lot #
121 006-591-013-000 $14.53 67
122 006-591-014-000 $14.53 68
123 006-591-015-000 $14.53 69
124 006-591-016-000 $14.53 70
125 006-591-017-000 $14.53 71
126 006-591-018-000 $14.53 72
127 006-591-019-000 $14.53 73
128 006-591-020-000 $14.53 74
129 006-591-021-000 $14.53 75
130 006-591-022-000 $14.53 76
131 006-591-023-000 $14.53 77
132 006-591-024-000 $14.53 78
133 006-591-025-000 $14.53 79
134 006-591-026-000 $14.53 80
135 006-591-027-000 $14.53 81
136 006-591-028-000 $14.53 82
137 006-591-029-000 $14.53 83
138 006-591-030-000 $14.53 84
139 006-591-031-000 $14.53 85
140 006-591-032-000 $14.53 86
141 006-591-033-000 $14.53 87
142 006-591-034-000 $14.53 88
143 006-591-035-000 $14.53 89
144 006-591-036-000 $14.53 90
145 006-591-037-000 $14.53 91
146 006-591-038-000 $14.53 92
147 006-591-039-000 $14.53 93
148 006-591-040-000 $14.53 94
149 006-591-041-000 $14.53 95
150 006-591-042-000 $14.53 96
151 006-591-043-000 $14.53 97
152 006-591-044-000 $14.53 98
153 006-591-045-000 $14.53 99
154 006-591-046-000 $14.53 100
155 006-591-047-000 $14.53 101
156 006-591-048-000 $14.53 102
157 006-591-049-000 $14.53 103
158 006-591-050-000 $14.53 104
159 006-591-051-000 $14.53 105
160 006-591-052-000 $14.53 106
161 006-591-053-000 $14.53 107
162 006-591-054-000 $14.53 108
163 006-591-055-000 $14.53 109
164 006-591-056-000 $14.53 110
Assessment Assessor’s Parcel
Number Number Assessment Developer Lot #
165 006-591-057-000 $14.53 111
166 006-591-058-000 $14.53 112
167 006-591-059-000 $14.53 113
168 006-591-060-000 $14.53 114
169 006-591-061-000 $14.53 115
170 006-591-062-000 $14.53 116
171 006-591-063-000 $14.53 117
172 006-591-064-000 $14.53 118
173 006-591-065-000 $14.53 119
174 006-592-002-000 $14.53 120
175 006-592-003-000 $14.53 121
176 006-592-004-000 $14.53 122
177 006-592-005-000 $14.53 123
178 006-592-006-000 $14.53 124
179 006-592-007-000 $14.53 125
180 006-592-008-000 $14.53 126
181 006-592-009-000 $14.53 127
182 006-592-010-000 $14.53 128
183 006-592-011-000 $14.53 129
184 006-592-012-000 $14.53 130
185 006-592-013-000 $14.53 131
186 006-592-014-000 $14.53 132
187 006-592-015-000 $14.53 133
188 006-592-016-000 $14.53 134
189 006-592-017-000 $14.53 135
190 006-592-018-000 $14.53 136
191 006-592-019-000 $14.53 137
192 006-592-020-000 $14.53 138
193 006-592-021-000 $14.53 139
194 006-592-022-000 $14.53 140
195 006-592-023-000 $14.53 141
196 006-592-024-000 $14.53 142
197 006-592-025-000 $14.53 143
198 006-592-026-000 $14.53 144
199 006-592-027-000 $14.53 145
200 006-592-028-000 $14.53 146
201 006-592-029-000 $14.53 147
202 006-592-030-000 $14.53 148
203 006-592-031-000 $14.53 149
204 006-592-032-000 $14.53 150
205 006-592-033-000 $14.53 151
206 006-592-034-000 $14.53 152
207 006-592-035-000 $14.53 153
208 006-592-036-000 $14.53 154
Assessment Assessor’s Parcel
Number Number Assessment Developer Lot #
209 006-592-037-000 $14.53 155
210 006-592-038-000 $14.53 156
211 006-592-039-000 $14.53 157
212 006-592-040-000 $14.53 158
213 006-592-041-000 $14.53 159
214 006-592-042-000 $14.53 160
215 006-592-043-000 $14.53 161
216 006-592-044-000 $14.53 162
217 006-592-045-000 $14.53 163
218 006-592-046-000 $14.53 164
219 006-592-047-000 $14.53 165
220 006-592-048-000 $14.53 166
221 006-592-049-000 $14.53 167
222 006-592-050-000 $14.53 168
223 006-592-051-000 $14.53 169
224 006-592-052-000 $14.53 170
225 006-592-053-000 $14.53 171
226 006-592-054-000 $14.53 172
227 006-601-001-000 $14.53 1
228 006-601-002-000 $14.53 2
229 006-601-003-000 $14.53 3
230 006-601-004-000 $14.53 4
231 006-601-005-000 $14.53 5
232 006-601-006-000 $14.53 6
233 006-601-007-000 $14.53 7
.
1. BEGINNING FUND BALANCE $ (217.45)
2. LANDSCAPE MAINTENANCE COSTS $ 0.00
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 256.27
b. ENGINEERING ADMINISTRATION $ 49.13
c. LEGAL ADMINISTRATION $ 10.48
d. FINANCE ADMINISTRATION $ 7.29
e. TREE TRIMMING $ 68.00
f. GAS & UTILITIES $ 11.02
g. EQUIPMENT g. 0.00
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 0.00
i. MADERA COUNTY PROCESSING FEES $ 7.92
TOTAL COSTS: $ 410.12
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (305.55)
5. TOTAL ASSESSMENT $ 322.02
6. AVERAGE ASSESSMENT PER PARCEL 35.78
CITY OF MADERA
ZONE 23
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-150-004-000 $35.78
2 008-150-005-000 $35.78
3 008-150-006-000 $35.78
4 008-150-007-000 $35.78
5 008-150-008-000 $35.78
6 008-150-009-000 $35.78
7 008-150-010-000 $35.78
8 008-150-011-000 $35.78
9 008-150-012-000 $35.78
TOTAL $322.02
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 23 - ELM ESTATES II
TOTAL ASSESSMENT:
$322.02
LANDSCAPE MAINTENANCE DISTRICT
.
1. BEGINNING FUND BALANCE $ 11,021.56
2. LANDSCAPE MAINTENANCE COSTS $ 11,182.27
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 462.17
b. ENGINEERING ADMINISTRATION $ 155.44
c. LEGAL ADMINISTRATION $ 33.17
d. FINANCE ADMINISTRATION $ 23.06
e. TREE TRIMMING $ 1,643.00
f. GAS & UTILITIES $ 1,333.70
g. EQUIPMENT g. 757.04
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 234.49
i. MADERA COUNTY PROCESSING FEES $ 42.24
TOTAL COSTS: $ 15,866.58
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 6,037.60
5. TOTAL ASSESSMENT $ 10,882.14
6. AVERAGE ASSESSMENT PER PARCEL 226.72
CITY OF MADERA
ZONE 24
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-120-003-000 $226.71 36 008-120-038-000 $226.71
2 008-120-004-000 $226.71 37 008-120-039-000 $226.71
3 008-120-005-000 $226.71 38 008-120-040-000 $226.71
4 008-120-006-000 $226.71 39 008-120-041-000 $226.71
5 008-120-007-000 $226.71 40 008-120-042-000 $226.71
6 008-120-008-000 $226.71 41 008-120-043-000 $226.71
7 008-120-009-000 $226.71 42 008-120-044-000 $226.71
8 008-120-010-000 $226.71 43 008-120-045-000 $226.71
9 008-120-011-000 $226.71 44 008-120-046-000 $226.71
10 008-120-012-000 $226.71 45 008-120-047-000 $226.71
11 008-120-013-000 $226.71 46 008-120-048-000 $226.71
12 008-120-014-000 $226.71 47 008-120-049-000 $226.71
13 008-120-015-000 $226.71 48 008-120-050-000 $226.71
14 008-120-016-000 $226.71
15 008-120-017-000 $226.71 $10,882.14
16 008-120-018-000 $226.71
17 008-120-019-000 $226.71
18 008-120-020-000 $226.71
19 008-120-021-000 $226.71
20 008-120-022-000 $226.71
21 008-120-023-000 $226.71
22 008-120-024-000 $226.71
23 008-120-025-000 $226.71
24 008-120-026-000 $226.71
25 008-120-027-000 $226.71
26 008-120-028-000 $226.71
27 008-120-029-000 $226.71
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 24 - VISTA DEL SIERRA (RDA)
TOTAL ASSESSMENT:
$10,882.14
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 008-120-030-000 $226.71
29 008-120-031-000 $226.71
30 008-120-032-000 $226.71
31 008-120-033-000 $226.71
32 008-120-034-000 $226.71
33 008-120-035-000 $226.71
34 008-120-036-000 $226.71
35 008-120-037-000 $226.71
+ BEGINNING FUND BALANCE $ (1,093.62)
2. LANDSCAPE MAINTENANCE COSTS $ 1,709.80
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 289.42
b. ENGINEERING ADMINISTRATION $ 139.08
c. LEGAL ADMINISTRATION $ 29.68
d. FINANCE ADMINISTRATION $ 20.63
e. TREE TRIMMING $ 360.00
f. GAS & UTILITIES $ 150.19
g. EQUIPMENT g. 96.70
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 31.81
i. MADERA COUNTY PROCESSING FEES $ 36.96
.
TOTAL COSTS: $ 2,864.29
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (1,949.64)
5. TOTAL ASSESSMENT $ 2,008.27
6 AVERAGE ASSESSMENT PER PARCEL 47.82
CITY OF MADERA
ZONE 25C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-570-001-000 $47.82 36 006-570-036-000 $47.82
2 006-570-002-000 $47.82 37 006-570-037-000 $47.82
3 006-570-003-000 $47.82 38 006-570-038-000 $47.82
4 006-570-004-000 $47.82 39 006-570-039-000 $47.82
5 006-570-005-000 $47.82 40 006-570-040-000 $47.82
6 006-570-006-000 $47.82 41 006-570-041-000 $47.82
7 006-570-007-000 $47.82 42 006-570-042-000 $47.82
8 006-570-008-000 $47.82
9 006-570-009-000 $47.82 $2,008.27
10 006-570-010-000 $47.82
11 006-570-011-000 $47.82
12 006-570-012-000 $47.82
13 006-570-013-000 $47.82
14 006-570-014-000 $47.82
15 006-570-015-000 $47.82
16 006-570-016-000 $47.82
17 006-570-017-000 $47.82
18 006-570-018-000 $47.82
19 006-570-019-000 $47.82
20 006-570-020-000 $47.82
21 006-570-021-000 $47.82
22 006-570-022-000 $47.82
23 006-570-023-000 $47.82
24 006-570-024-000 $47.82
25 006-570-025-000 $47.82
26 006-570-026-000 $47.82
27 006-570-027-000 $47.82
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 25C - COTTONWOOD PHASE III
TOTAL ASSESSMENT:
$2,008.27
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 006-570-028-000 $47.82
29 006-570-029-000 $47.82
30 006-570-030-000 $47.82
31 006-570-031-000 $47.82
32 006-570-032-000 $47.82
33 006-570-033-000 $47.82
34 006-570-034-000 $47.82
35 006-570-035-000 $47.82
+ BEGINNING FUND BALANCE $ 2,860.01
2. LANDSCAPE MAINTENANCE COSTS $ 1,587.67
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 289.42
b. ENGINEERING ADMINISTRATION $ 130.91
c. LEGAL ADMINISTRATION $ 27.93
d. FINANCE ADMINISTRATION $ 19.42
e. TREE TRIMMING $ 360.00
f. GAS & UTILITIES $ 150.19
g. EQUIPMENT g. 103.94
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 29.56
i. MADERA COUNTY PROCESSING FEES $ 34.32
TOTAL COSTS: $ 2,733.36
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 2,206.47
5. TOTAL ASSESSMENT $ 2,079.82
6. AVERAGE ASSESSMENT PER PARCEL 53.33
CITY OF MADERA
ZONE 25D
2024-25
$2,079.82
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-580-001-000 $53.33 36 006-580-036-000 $53.33
2 006-580-002-000 $53.33 37 006-580-037-000 $53.33
3 006-580-003-000 $53.33 38 006-580-038-000 $53.33
4 006-580-004-000 $53.33 39 006-580-039-000 $53.33
5 006-580-005-000 $53.33
Total $2,079.82
6 006-580-006-000 $53.33
7 006-580-007-000 $53.33
8 006-580-008-000 $53.33
9 006-580-009-000 $53.33
10 006-580-010-000 $53.33
11 006-580-011-000 $53.33
12 006-580-012-000 $53.33
13 006-580-013-000 $53.33
14 006-580-014-000 $53.33
15 006-580-015-000 $53.33
16 006-580-016-000 $53.33
17 006-580-017-000 $53.33
18 006-580-018-000 $53.33
19 006-580-019-000 $53.33
20 006-580-020-000 $53.33
21 006-580-021-000 $53.33
22 006-580-022-000 $53.33
23 006-580-023-000 $53.33
24 006-580-024-000 $53.33
25 006-580-025-000 $53.33
26 006-580-026-000 $53.33
27 006-580-027-000 $53.33
Zone 25D - Cottonwood Esates Phase 4
TOTAL ASSESSMENT:
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 006-580-028-000 $53.33
29 006-580-029-000 $53.33
30 006-580-030-000 $53.33
31 006-580-031-000 $53.33
32 006-580-032-000 $53.33
33 006-580-033-000 $53.33
34 006-580-034-000 $53.33
35 006-580-035-000 $53.33
1. BEGINNING FUND BALANCE $ (1,174.04)
2. LANDSCAPE MAINTENANCE COSTS $ 1,490.28
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 256.31
b. ENGINEERING ADMINISTRATION $ 237.21
c. LEGAL ADMINISTRATION $ 50.62
d. FINANCE ADMINISTRATION $ 35.19
e. TREE TRIMMING $ 113.00
f. GAS & UTILITIES $ 147.86
g. EQUIPMENT g. 36.50
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 37.84
i. MADERA COUNTY PROCESSING FEES $ 68.64
TOTAL COSTS: $ 2,473.45
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (2,016.42)
5. TOTAL ASSESSMENT $ 1,631.07
6. AVERAGE ASSESSMENT PER PARCEL 20.91
CITY OF MADERA
ZONE 26
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-260-001-000 $20.91 36 005-260-036-000 $20.91
2 005-260-002-000 $20.91 37 005-260-037-000 $20.91
3 005-260-003-000 $20.91 38 005-260-038-000 $20.91
4 005-260-004-000 $20.91 39 005-260-039-000 $20.91
5 005-260-005-000 $20.91 40 005-260-040-000 $20.91
6 005-260-006-000 $20.91 41 005-260-041-000 $20.91
7 005-260-007-000 $20.91 42 005-260-042-000 $20.91
8 005-260-008-000 $20.91 43 005-260-043-000 $20.91
9 005-260-009-000 $20.91 44 005-260-044-000 $20.91
10 005-260-010-000 $20.91 45 005-260-045-000 $20.91
11 005-260-011-000 $20.91 46 005-260-046-000 $20.91
12 005-260-012-000 $20.91 47 005-260-047-000 $20.91
13 005-260-013-000 $20.91 48 005-260-048-000 $20.91
14 005-260-014-000 $20.91 49 005-260-049-000 $20.91
15 005-260-015-000 $20.91 50 005-260-050-000 $20.91
16 005-260-016-000 $20.91 51 005-260-051-000 $20.91
17 005-260-017-000 $20.91 52 005-260-052-000 $20.91
18 005-260-018-000 $20.91 53 005-260-053-000 $20.91
19 005-260-019-000 $20.91 54 005-260-054-000 $20.91
20 005-260-020-000 $20.91 55 005-260-055-000 $20.91
21 005-260-021-000 $20.91 56 005-260-056-000 $20.91
22 005-260-022-000 $20.91 57 005-260-057-000 $20.91
23 005-260-023-000 $20.91 58 005-260-058-000 $20.91
24 005-260-024-000 $20.91 59 005-260-059-000 $20.91
25 005-260-025-000 $20.91 60 005-260-060-000 $20.91
26 005-260-026-000 $20.91 61 005-260-061-000 $20.91
27 005-260-027-000 $20.91 62 005-260-062-000 $20.91
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 26 - CORDOVA ESTATES PHASE I & II
TOTAL ASSESSMENT:
$1,631.07
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-260-028-000 $20.91 63 005-260-063-000 $20.91
29 005-260-029-000 $20.91 64 005-260-064-000 $20.91
30 005-260-030-000 $20.91 65 005-260-065-000 $20.91
31 005-260-031-000 $20.91 66 005-260-066-000 $20.91
32 005-260-032-000 $20.91 67 005-260-067-000 $20.91
33 005-260-033-000 $20.91 68 005-260-068-000 $20.91
34 005-260-034-000 $20.91 69 005-260-069-000 $20.91
35 005-260-035-000 $20.91 70 005-260-070-000 $20.91
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 005-260-071-000 $20.91
72 005-260-072-000 $20.91
73 005-260-073-000 $20.91
74 005-260-074-000 $20.91
75 005-260-075-000 $20.91
76 005-260-076-000 $20.91
77 005-260-077-000 $20.91
78 005-260-078-000 $20.91
TOTAL $1,631.07
1. BEGINNING FUND BALANCE $ 26.70
2. LANDSCAPE MAINTENANCE COSTS $ 531.02
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 266.89
b. ENGINEERING ADMINISTRATION $ 190.87
c. LEGAL ADMINISTRATION $ 40.73
d. FINANCE ADMINISTRATION $ 28.32
e. TREE TRIMMING $ 225.00
f. GAS & UTILITIES $ 64.37
g. EQUIPMENT g. 144.75
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 155.86
i. MADERA COUNTY PROCESSING FEES $ 53.68
TOTAL COSTS: $ 1,701.49
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 445.45
5. TOTAL ASSESSMENT $ 2,119.63
6. AVERAGE ASSESSMENT PER PARCEL 34.76
CITY OF MADERA
ZONE 26B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-240-003-000 $34.75 36 005-240-040-000 $34.75
2 005-240-004-000 $34.75 37 005-240-041-000 $34.75
3 005-240-005-000 $34.75 38 005-240-042-000 $34.75
4 005-240-006-000 $34.75 39 005-240-043-000 $34.75
5 005-240-007-000 $34.75 40 005-240-044-000 $34.75
6 005-240-008-000 $34.75 41 005-240-045-000 $34.75
7 005-240-009-000 $34.75 42 005-240-046-000 $34.75
8 005-240-010-000 $34.75 43 005-240-047-000 $34.75
9 005-240-011-000 $34.75 44 005-240-048-000 $34.75
10 005-240-012-000 $34.75 45 005-240-049-000 $34.75
11 005-240-013-000 $34.75 46 005-240-050-000 $34.75
12 005-240-016-000 $34.75 47 005-240-051-000 $34.75
13 005-240-017-000 $34.75 48 005-240-052-000 $34.75
14 005-240-018-000 $34.75 49 005-240-053-000 $34.75
15 005-240-019-000 $34.75 50 005-240-054-000 $34.75
16 005-240-020-000 $34.75 51 005-240-055-000 $34.75
17 005-240-021-000 $34.75 52 005-240-056-000 $34.75
18 005-240-022-000 $34.75 53 005-240-057-000 $34.75
19 005-240-023-000 $34.75 54 005-240-058-000 $34.75
20 005-240-024-000 $34.75 55 005-240-059-000 $34.75
21 005-240-025-000 $34.75 56 005-240-060-000 $34.75
22 005-240-026-000 $34.75 57 005-240-061-000 $34.75
23 005-240-027-000 $34.75 58 005-240-062-000 $34.75
24 005-240-028-000 $34.75 59 005-240-064-000 $34.75
25 005-240-029-000 $34.75 60 005-240-065-000 $34.75
26 005-240-030-000 $34.75 61 005-240-066-000 $34.75
27 005-240-031-000 $34.75
ASSESSMENT ROLL
ZONE 26B - CORDOVA ESTATES PHASE III
TOTAL ASSESSMENT:
$2,119.63
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-240-032-000 $34.75 TOTAL $2,119.63
29 005-240-033-000 $34.75
30 005-240-034-000 $34.75
31 005-240-035-000 $34.75
32 005-240-036-000 $34.75
33 005-240-037-000 $34.75
34 005-240-038-000 $34.75
35 005-240-039-000 $34.75
1. BEGINNING FUND BALANCE $ 183.55
2. LANDSCAPE MAINTENANCE COSTS $ 531.02
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 256.31
b. ENGINEERING ADMINISTRATION $ 166.34
c. LEGAL ADMINISTRATION $ 35.49
d. FINANCE ADMINISTRATION $ 24.68
e. TREE TRIMMING $ 113.00
f. GAS & UTILITIES $ 24.06
g. EQUIPMENT g. 15.15
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 25.20
i. MADERA COUNTY PROCESSING FEES $ 45.76
TOTAL COSTS: $ 1,237.02
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 133.22
5. TOTAL ASSESSMENT $ 1,186.17
6. AVERAGE ASSESSMENT PER PARCEL 22.82
CITY OF MADERA
ZONE 26C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-241-002-000 $22.81 36 005-241-037-000 $22.81
2 005-241-003-000 $22.81 37 005-241-038-000 $22.81
3 005-241-004-000 $22.81 38 005-241-039-000 $22.81
4 005-241-005-000 $22.81 39 005-241-040-000 $22.81
5 005-241-006-000 $22.81 40 005-241-041-000 $22.81
6 005-241-007-000 $22.81 41 005-241-042-000 $22.81
7 005-241-008-000 $22.81 42 005-241-043-000 $22.81
8 005-241-009-000 $22.81 43 005-241-044-000 $22.81
9 005-241-010-000 $22.81 44 005-241-045-000 $22.81
10 005-241-011-000 $22.81 45 005-241-046-000 $22.81
11 005-241-012-000 $22.81 46 005-241-047-000 $22.81
12 005-241-013-000 $22.81 47 005-241-048-000 $22.81
13 005-241-014-000 $22.81 48 005-241-049-000 $22.81
14 005-241-015-000 $22.81 49 005-241-050-000 $22.81
15 005-241-016-000 $22.81 50 005-241-051-000 $22.81
16 005-241-017-000 $22.81 51 005-241-052-000 $22.81
17 005-241-018-000 $22.81 52 005-241-053-000 $22.81
18 005-241-019-000 $22.81
19 005-241-020-000 $22.81 TOTAL $1,186.17
20 005-241-021-000 $22.81
21 005-241-022-000 $22.81
22 005-241-023-000 $22.81
23 005-241-024-000 $22.81
24 005-241-025-000 $22.81
25 005-241-026-000 $22.81
26 005-241-027-000 $22.81
27 005-241-028-000 $22.81
ASSESSMENT ROLL
ZONE 26C - CORDOVA ESTATES PHASE IV
TOTAL ASSESSMENT:
$1,186.17
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-241-029-000 $22.81
29 005-241-030-000 $22.81
30 005-241-031-000 $22.81
31 005-241-032-000 $22.81
32 005-241-033-000 $22.81
33 005-241-034-000 $22.81
34 005-241-035-000 $22.81
35 005-241-036-000 $22.81
1. BEGINNING FUND BALANCE $ (2,247.67)
2. LANDSCAPE MAINTENANCE COSTS $ 2,202.88
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 266.89
b. ENGINEERING ADMINISTRATION $ 87.29
c. LEGAL ADMINISTRATION $ 18.63
d. FINANCE ADMINISTRATION $ 12.95
e. TREE TRIMMING $ 338.00
f. GAS & UTILITIES $ 64.37
g. EQUIPMENT g. 56.28
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 58.77
i. MADERA COUNTY PROCESSING FEES $ 20.24
TOTAL COSTS: $ 3,126.31
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (4,523.65)
5. TOTAL ASSESSMENT $ 850.32
6. AVERAGE ASSESSMENT PER PARCEL 36.97
CITY OF MADERA
ZONE 26D
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-161-001-000 $36.97
2 005-161-002-000 $36.97
3 005-161-003-000 $36.97
4 005-161-004-000 $36.97
5 005-161-005-000 $36.97
6 005-161-006-000 $36.97
7 005-161-007-000 $36.97
8 005-161-008-000 $36.97
9 005-161-009-000 $36.97
10 005-161-010-000 $36.97
11 005-161-011-000 $36.97
12 005-161-012-000 $36.97
13 005-161-013-000 $36.97
14 005-161-014-000 $36.97
15 005-161-015-000 $36.97
16 005-161-016-000 $36.97
17 005-161-017-000 $36.97
18 005-161-018-000 $36.97
19 005-161-019-000 $36.97
20 005-161-020-000 $36.97
21 005-161-021-000 $36.97
22 005-161-022-000 $36.97
23 005-161-023-000 $36.97
TOTAL $850.32
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 26D - OAKWOOD ESTATES
TOTAL ASSESSMENT:
$850.32
LANDSCAPE MAINTENANCE DISTRICT
1. BEGINNING FUND BALANCE $ 1,541.85
2. LANDSCAPE MAINTENANCE COSTS $ 837.40
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 261.81
b. ENGINEERING ADMINISTRATION $ 149.99
c. LEGAL ADMINISTRATION $ 32.00
d. FINANCE ADMINISTRATION $ 22.25
e. TREE TRIMMING $ 203.00
f. GAS & UTILITIES $ 45.01
g. EQUIPMENT g. 46.95
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 9.35
i. MADERA COUNTY PROCESSING FEES $ 40.48
TOTAL COSTS: $ 1,648.24
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 1,572.91
5. TOTAL ASSESSMENT $ 1,679.30
6. AVERAGE ASSESSMENT PER PARCEL 36.51
CITY OF MADERA
ZONE 27A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-454-001-000 $36.50 36 006-454-036-000 $36.51
2 006-454-002-000 $36.51 37 006-454-037-000 $36.51
3 006-454-003-000 $36.51 38 006-454-038-000 $36.51
4 006-454-004-000 $36.51 39 006-454-039-000 $36.51
5 006-454-005-000 $36.51 40 006-454-040-000 $36.51
6 006-454-006-000 $36.51 41 006-454-041-000 $36.51
7 006-454-007-000 $36.51 42 006-454-042-000 $36.51
8 006-454-008-000 $36.51 43 006-454-043-000 $36.51
9 006-454-009-000 $36.51 44 006-454-044-000 $36.51
10 006-454-010-000 $36.51 45 006-454-045-000 $36.51
11 006-454-011-000 $36.51 46 006-454-046-000 $36.51
12 006-454-012-000 $36.51
13 006-454-013-000 $36.51 TOTAL $1,679.29
14 006-454-014-000 $36.51
15 006-454-015-000 $36.51
16 006-454-016-000 $36.51
17 006-454-017-000 $36.51
18 006-454-018-000 $36.51
19 006-454-019-000 $36.51
20 006-454-020-000 $36.51
21 006-454-021-000 $36.51
22 006-454-022-000 $36.51
23 006-454-023-000 $36.51
24 006-454-024-000 $36.51
25 006-454-025-000 $36.51
26 006-454-026-000 $36.51
27 006-454-027-000 $36.51
ASSESSMENT ROLL
ZONE 27A - VINEYARD WEST I
TOTAL ASSESSMENT:
$1,679.30
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 006-454-028-000 $36.51
29 006-454-029-000 $36.51
30 006-454-030-000 $36.51
31 006-454-031-000 $36.51
32 006-454-032-000 $36.51
33 006-454-033-000 $36.51
34 006-454-034-000 $36.51
35 006-454-035-000 $36.51
1. BEGINNING FUND BALANCE $ (2,110.20)
2. LANDSCAPE MAINTENANCE COSTS $ 2,819.79
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 299.11
b. ENGINEERING ADMINISTRATION $ 144.53
c. LEGAL ADMINISTRATION $ 30.84
d. FINANCE ADMINISTRATION $ 21.44
e. TREE TRIMMING $ 315.00
f. GAS & UTILITIES $ 331.32
g. EQUIPMENT g. 82.16
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 31.55
i. MADERA COUNTY PROCESSING FEES 38.72
TOTAL COSTS: $ 4,114.46
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (4,073.59)
5. TOTAL ASSESSMENT $ 2,150.64
6. AVERAGE ASSESSMENT PER PARCEL 48.89
CITY OF MADERA
ZONE 27B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 006-550-001-000 $48.88 36 006-550-036-000 $48.88
2 006-550-002-000 $48.88 37 006-550-037-000 $48.88
3 006-550-003-000 $48.88 38 006-550-038-000 $48.88
4 006-550-004-000 $48.88 39 006-550-039-000 $48.88
5 006-550-005-000 $48.88 40 006-550-040-000 $48.88
6 006-550-006-000 $48.88 41 006-550-041-000 $48.88
7 006-550-007-000 $48.88 42 006-550-042-000 $48.88
8 006-550-008-000 $48.88 43 006-550-043-000 $48.88
9 006-550-009-000 $48.88 44 006-550-044-000 $48.88
10 006-550-010-000 $48.88
TOTAL $2,150.64
11 006-550-011-000 $48.88
12 006-550-012-000 $48.88
13 006-550-013-000 $48.88
14 006-550-014-000 $48.88
15 006-550-015-000 $48.88
16 006-550-016-000 $48.88
17 006-550-017-000 $48.88
18 006-550-018-000 $48.88
19 006-550-019-000 $48.88
20 006-550-020-000 $48.88
21 006-550-021-000 $48.88
22 006-550-022-000 $48.88
23 006-550-023-000 $48.88
24 006-550-024-000 $48.88
25 006-550-025-000 $48.88
26 006-550-026-000 $48.88
27 006-550-027-000 $48.88
ASSESSMENT ROLL
ZONE 27B - VINEYARD WEST II
TOTAL ASSESSMENT:
$2,150.64
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 006-550-028-000 $48.88
29 006-550-029-000 $48.88
30 006-550-030-000 $48.88
31 006-550-031-000 $48.88
32 006-550-032-000 $48.88
33 006-550-033-000 $48.88
34 006-550-034-000 $48.88
35 006-550-035-000 $48.88
1. BEGINNING FUND BALANCE $ 7,480.02
2. LANDSCAPE MAINTENANCE COSTS $ 2,910.73
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 301.72
b. ENGINEERING ADMINISTRATION $ 422.56
c. LEGAL ADMINISTRATION $ 90.17
d. FINANCE ADMINISTRATION $ 62.69
e. TREE TRIMMING $ 833.00
f. GAS & UTILITIES $ 197.07
g. EQUIPMENT g. 181.54
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 168.92
i. MADERA COUNTY PROCESSING FEES $ 128.48
TOTAL COSTS: $ 5,296.88
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 7,708.19
5. TOTAL ASSESSMENT $ 5,523.59
6. AVERAGE ASSESSMENT PER PARCEL 37.84
CITY OF MADERA
ZONE 28A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-500-002-000 $37.83 36 009-500-037-000 $37.83
2 009-500-003-000 $37.83 37 009-500-038-000 $37.83
3 009-500-004-000 $37.83 38 009-500-039-000 $37.83
4 009-500-005-000 $37.83 39 009-500-040-000 $37.83
5 009-500-006-000 $37.83 40 009-500-041-000 $37.83
6 009-500-007-000 $37.83 41 009-500-042-000 $37.83
7 009-500-008-000 $37.83 42 009-500-043-000 $37.83
8 009-500-009-000 $37.83 43 009-500-044-000 $37.83
9 009-500-010-000 $37.83 44 009-500-045-000 $37.83
10 009-500-011-000 $37.83 45 009-500-046-000 $37.83
11 009-500-012-000 $37.83 46 009-500-047-000 $37.83
12 009-500-013-000 $37.83 47 009-500-048-000 $37.83
13 009-500-014-000 $37.83 48 009-500-049-000 $37.83
14 009-500-015-000 $37.83 49 009-500-050-000 $37.83
15 009-500-016-000 $37.83 50 009-500-051-000 $37.83
16 009-500-017-000 $37.83 51 009-500-052-000 $37.83
17 009-500-018-000 $37.83 52 009-500-053-000 $37.83
18 009-500-019-000 $37.83 53 009-500-054-000 $37.83
19 009-500-020-000 $37.83 54 009-500-055-000 $37.83
20 009-500-021-000 $37.83 55 009-500-056-000 $37.83
21 009-500-022-000 $37.83 56 009-500-057-000 $37.83
22 009-500-023-000 $37.83 57 009-500-058-000 $37.83
23 009-500-024-000 $37.83 58 009-500-059-000 $37.83
24 009-500-025-000 $37.83 59 009-500-060-000 $37.83
25 009-500-026-000 $37.83 60 009-500-061-000 $37.83
26 009-500-027-000 $37.83 61 009-500-062-000 $37.83
27 009-500-028-000 $37.83 62 009-500-063-000 $37.83
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 28 - CAPISTRANO XII & XIV
TOTAL ASSESSMENT:
$5,523.59
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 009-500-029-000 $37.83 63 009-500-064-000 $37.83
29 009-500-030-000 $37.83 64 009-500-065-000 $37.83
30 009-500-031-000 $37.83 65 009-500-066-000 $37.83
31 009-500-032-000 $37.83 66 009-500-067-000 $37.83
32 009-500-033-000 $37.83 67 009-500-068-000 $37.83
33 009-500-034-000 $37.83 68 009-500-069-000 $37.83
34 009-500-035-000 $37.83 69 009-500-070-000 $37.83
35 009-500-036-000 $37.83 70 009-500-071-000 $37.83
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 009-500-072-000 $37.83 116 009-530-030-000 $37.83
72 009-500-073-000 $37.83 117 009-530-031-000 $37.83
73 009-500-074-000 $37.83 118 009-530-032-000 $37.83
74 009-500-075-000 $37.83 119 009-530-033-000 $37.83
75 009-500-076-000 $37.83 120 009-530-034-000 $37.83
76 009-500-077-000 $37.83 121 009-530-035-000 $37.83
77 009-500-078-000 $37.83 122 009-530-036-000 $37.83
78 009-500-079-000 $37.83 123 009-530-037-000 $37.83
79 009-500-080-000 $37.83 124 009-530-038-000 $37.83
80 009-500-081-000 $37.83 125 009-530-039-000 $37.83
81 009-500-082-000 $37.83 126 009-530-040-000 $37.83
82 009-500-083-000 $37.83 127 009-530-041-000 $37.83
83 009-500-084-000 $37.83 128 009-530-042-000 $37.83
84 009-500-085-000 $37.83 129 009-530-043-000 $37.83
85 009-500-086-000 $37.83 130 009-530-044-000 $37.83
86 009-500-087-000 $37.83 131 009-530-045-000 $37.83
87 009-530-001-000 $37.83 132 009-530-046-000 $37.83
88 009-530-002-000 $37.83 133 009-530-047-000 $37.83
89 009-530-003-000 $37.83 134 009-530-048-000 $37.83
90 009-530-004-000 $37.83 135 009-530-049-000 $37.83
91 009-530-005-000 $37.83 136 009-530-050-000 $37.83
92 009-530-006-000 $37.83 137 009-530-051-000 $37.83
93 009-530-007-000 $37.83 138 009-530-052-000 $37.83
94 009-530-008-000 $37.83 139 009-530-053-000 $37.83
95 009-530-009-000 $37.83 140 009-530-054-000 $37.83
96 009-530-010-000 $37.83 141 009-530-055-000 $37.83
97 009-530-011-000 $37.83 142 009-530-056-000 $37.83
98 009-530-012-000 $37.83 143 009-530-057-000 $37.83
99 009-530-013-000 $37.83 144 009-530-058-000 $37.83
100 009-530-014-000 $37.83 145 009-530-059-000 $37.83
101 009-530-015-000 $37.83 146 009-530-060-000 $37.83
102 009-530-016-000 $37.83
103 009-530-017-000 $37.83 TOTAL $5,523.59
104 009-530-018-000 $37.83
105 009-530-019-000 $37.83
106 009-530-020-000 $37.83
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
107 009-530-021-000 $37.83
108 009-530-022-000 $37.83
109 009-530-023-000 $37.83
110 009-530-024-000 $37.83
111 009-530-025-000 $37.83
112 009-530-026-000 $37.83
113 009-530-027-000 $37.83
114 009-530-028-000 $37.83
115 009-530-029-000 $37.83
1. BEGINNING FUND BALANCE $ 2,201.28
2. LANDSCAPE MAINTENANCE COSTS $ 363.15
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 262.59
b. ENGINEERING ADMINISTRATION $ 229.03
c. LEGAL ADMINISTRATION $ 48.87
d. FINANCE ADMINISTRATION $ 33.98
e. TREE TRIMMING $ 180.00
f. GAS & UTILITIES $ 47.97
g. EQUIPMENT g. 25.47
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 27.94
i. MADERA COUNTY PROCESSING FEES $ 66.00
TOTAL COSTS: $ 1,285.00
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 2,358.34
5. TOTAL ASSESSMENT $ 1,442.06
6. AVERAGE ASSESSMENT PER PARCEL 19.23
CITY OF MADERA
ZONE 28B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-510-003-000 $19.23 36 009-510-038-000 $19.23
2 009-510-004-000 $19.23 37 009-510-039-000 $19.23
3 009-510-005-000 $19.23 38 009-510-040-000 $19.23
4 009-510-006-000 $19.23 39 009-510-041-000 $19.23
5 009-510-007-000 $19.23 40 009-510-042-000 $19.23
6 009-510-008-000 $19.23 41 009-510-043-000 $19.23
7 009-510-009-000 $19.23 42 009-510-044-000 $19.23
8 009-510-010-000 $19.23 43 009-510-049-000 $19.23
9 009-510-011-000 $19.23 44 009-510-050-000 $19.23
10 009-510-012-000 $19.23 45 009-510-051-000 $19.23
11 009-510-013-000 $19.23 46 009-510-052-000 $19.23
12 009-510-014-000 $19.23 47 009-510-053-000 $19.23
13 009-510-015-000 $19.23 48 009-510-054-000 $19.23
14 009-510-016-000 $19.23 49 009-510-055-000 $19.23
15 009-510-017-000 $19.23 50 009-510-056-000 $19.23
16 009-510-018-000 $19.23 51 009-510-057-000 $19.23
17 009-510-019-000 $19.23 52 009-510-058-000 $19.23
18 009-510-020-000 $19.23 53 009-510-059-000 $19.23
19 009-510-021-000 $19.23 54 009-510-060-000 $19.23
20 009-510-022-000 $19.23 55 009-510-061-000 $19.23
21 009-510-023-000 $19.23 56 009-510-062-000 $19.23
22 009-510-024-000 $19.23 57 009-510-063-000 $19.23
23 009-510-025-000 $19.23 58 009-510-064-000 $19.23
24 009-510-026-000 $19.23 59 009-510-065-000 $19.23
25 009-510-027-000 $19.23 60 009-510-066-000 $19.23
26 009-510-028-000 $19.23 61 009-510-067-000 $19.23
27 009-510-029-000 $19.23 62 009-510-068-000 $19.23
ASSESSMENT ROLL
ZONE 28B - CAPISTRANO XIII
TOTAL ASSESSMENT:
$1,442.06
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 009-510-030-000 $19.23 63 009-510-069-000 $19.23
29 009-510-031-000 $19.23 64 009-510-070-000 $19.23
30 009-510-032-000 $19.23 65 009-510-071-000 $19.23
31 009-510-033-000 $19.23 66 009-510-072-000 $19.23
32 009-510-034-000 $19.23 67 009-510-073-000 $19.23
33 009-510-035-000 $19.23 68 009-510-074-000 $19.23
34 009-510-036-000 $19.23 69 009-510-075-000 $19.23
35 009-510-037-000 $19.23 70 009-510-076-000 $19.23
71 009-510-077-000 $19.23
72 009-510-078-000 $19.23
73 009-510-079-000 $19.23
74 009-510-080-000 $19.23
75 009-510-081-000 $19.23
TOTAL $1,442.06
1. BEGINNING FUND BALANCE $ 7,568.89
2. LANDSCAPE MAINTENANCE COSTS $ 7,378.74
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 282.33
b. ENGINEERING ADMINISTRATION $ 528.86
c. LEGAL ADMINISTRATION $ 112.85
d. FINANCE ADMINISTRATION $ 78.46
e. TREE TRIMMING $ 495.00
f. GAS & UTILITIES $ 123.17
g. EQUIPMENT g. 282.48
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 37.66
i. MADERA COUNTY PROCESSING FEES $ 162.80
TOTAL COSTS: $ 9,482.35
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 7,298.72
5. TOTAL ASSESSMENT $ 9,212.19
6. AVERAGE ASSESSMENT PER PARCEL 49.80
CITY OF MADERA
ZONE 29
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-420-001-000 $49.80 36 012-420-036-000 $49.80
2 012-420-002-000 $49.80 37 012-420-037-000 $49.80
3 012-420-003-000 $49.80 38 012-420-038-000 $49.80
4 012-420-004-000 $49.80 39 012-420-039-000 $49.80
5 012-420-005-000 $49.80 40 012-420-040-000 $49.80
6 012-420-006-000 $49.80 41 012-420-041-000 $49.80
7 012-420-007-000 $49.80 42 012-420-042-000 $49.80
8 012-420-008-000 $49.80 43 012-420-043-000 $49.80
9 012-420-009-000 $49.80 44 012-420-044-000 $49.80
10 012-420-010-000 $49.80 45 012-420-045-000 $49.80
11 012-420-011-000 $49.80 46 012-420-046-000 $49.80
12 012-420-012-000 $49.80 47 012-420-047-000 $49.80
13 012-420-013-000 $49.80 48 012-420-048-000 $49.80
14 012-420-014-000 $49.80 49 012-420-049-000 $49.80
15 012-420-015-000 $49.80 50 012-420-050-000 $49.80
16 012-420-016-000 $49.80 51 012-420-051-000 $49.80
17 012-420-017-000 $49.80 52 012-420-052-000 $49.80
18 012-420-018-000 $49.80 53 012-420-053-000 $49.80
19 012-420-019-000 $49.80 54 012-420-054-000 $49.80
20 012-420-020-000 $49.80 55 012-420-055-000 $49.80
21 012-420-021-000 $49.80 56 012-420-056-000 $49.80
22 012-420-022-000 $49.80 57 012-420-057-000 $49.80
23 012-420-023-000 $49.80 58 012-420-058-000 $49.80
24 012-420-024-000 $49.80 59 012-420-059-000 $49.80
25 012-420-025-000 $49.80 60 012-420-060-000 $49.80
26 012-420-026-000 $49.80 61 012-420-061-000 $49.80
27 012-420-027-000 $49.80 62 012-420-062-000 $49.80
28 012-420-028-000 $49.80 63 012-420-063-000 $49.80
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 29 - CHATEAU AT THE VINEYARDS, PHASE I
TOTAL ASSESSMENT:
$9,212.19
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
29 012-420-029-000 $49.80 64 012-420-064-000 $49.80
30 012-420-030-000 $49.80 65 012-420-065-000 $49.80
31 012-420-031-000 $49.80 66 012-420-066-000 $49.80
32 012-420-032-000 $49.80 67 012-420-067-000 $49.80
33 012-420-033-000 $49.80 68 012-420-068-000 $49.80
34 012-420-034-000 $49.80 69 012-420-069-000 $49.80
35 012-420-035-000 $49.80 70 012-420-070-000 $49.80
71 012-412-001-000 $49.80 116 012-412-046-000 $49.80
72 012-412-002-000 $49.80 117 012-412-047-000 $49.80
73 012-412-003-000 $49.80 118 012-412-048-000 $49.80
74 012-412-004-000 $49.80 119 012-412-049-000 $49.80
75 012-412-005-000 $49.80 120 012-412-050-000 $49.80
76 012-412-006-000 $49.80 121 012-412-051-000 $49.80
77 012-412-007-000 $49.80 122 012-412-052-000 $49.80
78 012-412-008-000 $49.80 123 012-412-053-000 $49.80
79 012-412-009-000 $49.80 124 012-412-054-000 $49.80
80 012-412-010-000 $49.80 125 012-412-055-000 $49.80
81 012-412-011-000 $49.80 126 012-412-056-000 $49.80
82 012-412-012-000 $49.80 127 012-412-057-000 $49.80
83 012-412-013-000 $49.80 128 012-412-058-000 $49.80
84 012-412-014-000 $49.80 129 012-412-059-000 $49.80
85 012-412-015-000 $49.80 130 012-412-060-000 $49.80
86 012-412-016-000 $49.80 131 012-412-061-000 $49.80
87 012-412-017-000 $49.80 132 012-412-062-000 $49.80
88 012-412-018-000 $49.80 133 012-412-063-000 $49.80
89 012-412-019-000 $49.80 134 012-412-064-000 $49.80
90 012-412-020-000 $49.80 135 012-412-065-000 $49.80
91 012-412-021-000 $49.80 136 012-412-066-000 $49.80
92 012-412-022-000 $49.80 137 012-412-067-000 $49.80
93 012-412-023-000 $49.80 138 012-412-068-000 $49.80
94 012-412-024-000 $49.80 139 012-412-069-000 $49.80
95 012-412-025-000 $49.80 140 012-412-070-000 $49.80
96 012-412-026-000 $49.80 141 012-412-071-000 $49.80
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
97 012-412-027-000 $49.80 142 012-412-072-000 $49.80
98 012-412-028-000 $49.80 143 012-412-073-000 $49.80
99 012-412-029-000 $49.80 144 012-412-074-000 $49.80
100 012-412-030-000 $49.80 145 012-412-075-000 $49.80
101 012-412-031-000 $49.80 146 012-412-076-000 $49.80
102 012-412-032-000 $49.80 147 012-412-077-000 $49.80
103 012-412-033-000 $49.80 148 012-412-078-000 $49.80
104 012-412-034-000 $49.80 149 012-412-079-000 $49.80
105 012-412-035-000 $49.80 150 012-412-080-000 $49.80
106 012-412-036-000 $49.80 151 012-412-081-000 $49.80
107 012-412-037-000 $49.80 152 012-412-082-000 $49.80
108 012-412-038-000 $49.80 153 012-412-083-000 $49.80
109 012-412-039-000 $49.80 154 012-412-084-000 $49.80
110 012-412-040-000 $49.80 155 012-412-085-000 $49.80
111 012-412-041-000 $49.80 156 012-412-086-000 $49.80
112 012-412-042-000 $49.80 157 012-412-087-000 $49.80
113 012-412-043-000 $49.80 158 012-423-001-000 $49.80
114 012-412-044-000 $49.80 159 012-423-002-000 $49.80
115 012-412-045-000 $49.80 160 012-423-003-000 $49.80
161 012-423-004-000 $49.80
162 012-423-005-000 $49.80
163 012-423-006-000 $49.80
164 012-423-007-000 $49.80
165 012-423-008-000 $49.80
166 012-423-009-000 $49.80
167 012-423-010-000 $49.80
168 012-423-011-000 $49.80
169 012-423-012-000 $49.80
170 012-423-013-000 $49.80
171 012-423-014-000 $49.80
172 012-423-015-000 $49.80
173 012-423-016-000 $49.80
174 012-423-017-000 $49.80
175 012-423-018-000 $49.80
176 012-423-019-000 $49.80
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
177 012-423-020-000 $49.80
178 012-423-021-000 $49.80
179 012-423-022-000 $49.80
180 012-423-023-000 $49.80
181 012-423-024-000 $49.80
182 012-423-025-000 $49.80
183 012-423-026-000 $49.80
184 012-423-027-000 $49.80
185 012-423-028-000 $49.80
$9,212.19
1. BEGINNING FUND BALANCE $ 1,916.28
2. LANDSCAPE MAINTENANCE COSTS $ 4,109.81
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 282.33
b. ENGINEERING ADMINISTRATION $ 130.91
c. LEGAL ADMINISTRATION $ 27.93
d. FINANCE ADMINISTRATION $ 19.42
e. TREE TRIMMING $ 495.00
f. GAS & UTILITIES $ 123.17
g. EQUIPMENT g. 114.18
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 21.00
i. MADERA COUNTY PROCESSING FEES $ 34.32
TOTAL COSTS: $ 5,358.07
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 111.97
5. TOTAL ASSESSMENT $ 3,553.76
6. AVERAGE ASSESSMENT PER PARCEL 91.12
CITY OF MADERA
ZONE 29B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-421-001-000 $91.12 36 012-421-036-000 $91.12
2 012-421-002-000 $91.12 37 012-421-037-000 $91.12
3 012-421-003-000 $91.12 38 012-421-038-000 $91.12
4 012-421-004-000 $91.12 39 012-421-039-000 $91.12
5 012-421-005-000 $91.12
TOTAL $3,553.76
6 012-421-006-000 $91.12
7 012-421-007-000 $91.12
8 012-421-008-000 $91.12
9 012-421-009-000 $91.12
10 012-421-010-000 $91.12
11 012-421-011-000 $91.12
12 012-421-012-000 $91.12
13 012-421-013-000 $91.12
14 012-421-014-000 $91.12
15 012-421-015-000 $91.12
16 012-421-016-000 $91.12
17 012-421-017-000 $91.12
18 012-421-018-000 $91.12
19 012-421-019-000 $91.12
20 012-421-020-000 $91.12
21 012-421-021-000 $91.12
22 012-421-022-000 $91.12
23 012-421-023-000 $91.12
24 012-421-024-000 $91.12
25 012-421-025-000 $91.12
26 012-421-026-000 $91.12
27 012-421-027-000 $91.12
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 29B - CHATEAU AT THE VINEYARDS, PHASE II
TOTAL ASSESSMENT:
$3,553.76
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 012-421-028-000 $91.12
29 012-421-029-000 $91.12
30 012-421-030-000 $91.12
31 012-421-031-000 $91.12
32 012-421-032-000 $91.12
33 012421-033-000 $91.12
34 012-421-034-000 $91.12
35 012-421-035-000 $91.12
1. BEGINNING FUND BALANCE $ 2,063.01
2. LANDSCAPE MAINTENANCE COSTS $ 1,010.75
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 268.13
b. ENGINEERING ADMINISTRATION $ 76.39
c. LEGAL ADMINISTRATION $ 16.30
d. FINANCE ADMINISTRATION $ 11.33
e. TREE TRIMMING $ 495.00
f. GAS & UTILITIES $ 225.09
g. EQUIPMENT g. 30.35
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 5.15
i. MADERA COUNTY PROCESSING FEES $ 16.72
TOTAL COSTS: $ 2,155.21
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 1,743.69
5. TOTAL ASSESSMENT $ 1,835.90
6. AVERAGE ASSESSMENT PER PARCEL 96.63
CITY OF MADERA
ZONE 29C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-421-041-000 $96.62
2 012-421-042-000 $96.62
3 012-421-043-000 $96.62
4 012-421-044-000 $96.62
5 012-421-045-000 $96.62
6 012-421-046-000 $96.62
7 012-421-047-000 $96.62
8 012-421-048-000 $96.62
9 012-421-049-000 $96.62
10 012-421-050-000 $96.62
11 012-421-051-000 $96.62
12 012-421-052-000 $96.62
13 012-421-053-000 $96.62
14 012-420-072-000 $96.62
15 012-420-073-000 $96.62
16 012-420-074-000 $96.62
17 012-420-075-000 $96.62
18 012-420-076-000 $96.62
19 012-420-077-000 $96.62
TOTAL $1,835.78
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 29C - CHATEAU AT THE VINEYARDS, PHASE III
TOTAL ASSESSMENT:
$1,835.90
LANDSCAPE MAINTENANCE DISTRICT
1. BEGINNING FUND BALANCE $ 2,601.21
2. LANDSCAPE MAINTENANCE COSTS $ 3,689.36
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 282.33
b. ENGINEERING ADMINISTRATION $ 120.00
c. LEGAL ADMINISTRATION $ 25.61
d. FINANCE ADMINISTRATION $ 17.80
e. TREE TRIMMING $ 495.00
f. GAS & UTILITIES $ 123.17
g. EQUIPMENT g. 105.24
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 18.85
i. MADERA COUNTY PROCESSING FEES $ 30.80
TOTAL COSTS: $ 4,908.16
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 882.16
5. TOTAL ASSESSMENT $ 3,189.12
6. AVERAGE ASSESSMENT PER PARCEL 91.12
CITY OF MADERA
ZONE 29D
2024-25
$3,189.12
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-422-001-000 $91.12
2 012-422-002-000 $91.12
3 012-422-003-000 $91.12
4 012-422-004-000 $91.12
5 012-422-005-000 $91.12
6 012-422-006-000 $91.12
7 012-422-007-000 $91.12
8 012-422-008-000 $91.12
9 012-422-009-000 $91.12
10 012-422-010-000 $91.12
11 012-422-011-000 $91.12
12 012-422-012-000 $91.12
13 012-422-013-000 $91.12
14 012-422-014-000 $91.12
15 012-422-015-000 $91.12
16 012-422-016-000 $91.12
17 012-422-017-000 $91.12
18 012-422-018-000 $91.12
19 012-422-019-000 $91.12
20 012-422-020-000 $91.12
21 012-422-021-000 $91.12
22 012-422-022-000 $91.12
23 012-422-023-000 $91.12
24 012-422-024-000 $91.12
25 012-422-025-000 $91.12
26 012-422-026-000 $91.12
27 012-422-027-000 $91.12
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 29D - CHATEAU AT THE VINEYARDS, PHASE IV
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 012-422-028-000 $91.12
29 012-422-029-000 $91.12
30 012-422-030-000 $91.12
31 012-422-031-000 $91.12
32 012-422-032-000 $91.12
33 012-422-033-000 $91.12
34 012-422-034-000 $91.12
35 012-422-035-000 $91.12
TOTAL $3,189.12
1. BEGINNING FUND BALANCE $ 3,367.62
2. LANDSCAPE MAINTENANCE COSTS $ 1,553.08
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 271.65
b. ENGINEERING ADMINISTRATION $ 90.02
c. LEGAL ADMINISTRATION $ 19.21
d. FINANCE ADMINISTRATION $ 13.35
e. TREE TRIMMING $ 495.00
f. GAS & UTILITIES $ 82.49
g. EQUIPMENT g. 53.62
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 7.92
i. MADERA COUNTY PROCESSING FEES $ 21.12
TOTAL COSTS: $ 2,607.46
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 2,838.75
5. TOTAL ASSESSMENT $ 2,078.35
6. AVERAGE ASSESSMENT PER PARCEL 86.61
CITY OF MADERA
ZONE 29E
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-450-001-000 $86.60
2 012-450-002-000 $86.60
3 012-450-003-000 $86.60
4 012-450-004-000 $86.60
5 012-450-005-000 $86.60
6 012-450-006-000 $86.60
7 012-450-007-000 $86.60
8 012-450-008-000 $86.60
9 012-450-009-000 $86.60
10 012-450-010-000 $86.60
11 012-450-011-000 $86.60
12 012-450-012-000 $86.60
13 012-450-013-000 $86.60
14 012-450-014-000 $86.60
15 012-450-015-000 $86.60
16 012-450-016-000 $86.60
17 012-450-017-000 $86.60
18 012-450-018-000 $86.60
19 012-450-019-000 $86.60
20 012-450-020-000 $86.60
21 012-450-021-000 $86.60
22 012-450-022-000 $86.60
23 012-450-023-000 $86.60
24 012-450-024-000 $86.60
TOTAL $2,078.35
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 29E - CHATEAU AT THE VINEYARDS, EAST
TOTAL ASSESSMENT:
$2,078.35
LANDSCAPE MAINTENANCE DISTRICT
1. BEGINNING FUND BALANCE $ 249.91
2. LANDSCAPE MAINTENANCE COSTS $ 1,724.96
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 259.02
b. ENGINEERING ADMINISTRATION $ 109.10
c. LEGAL ADMINISTRATION $ 23.28
d. FINANCE ADMINISTRATION $ 16.19
e. TREE TRIMMING $ 135.00
f. GAS & UTILITIES $ 34.38
g. EQUIPMENT g. 78.07
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 10.23
i. MADERA COUNTY PROCESSING FEES $ 27.28
TOTAL COSTS: $ 2,417.51
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 535.41
5. TOTAL ASSESSMENT $ 2,702.70
6. AVERAGE ASSESSMENT PER PARCEL 87.19
CITY OF MADERA
ZONE 30
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-210-005-000 $90.09
2 012-210-006-000 $90.09
3 012-210-007-000 $90.09
4 012-210-008-000 $90.09
5 012-210-009-000 $90.09
6 012-210-010-000 $90.09
7 012-210-011-000 $90.09
8 012-210-012-000 $90.09
9 012-210-013-000 $90.09
10 012-210-014-000 $90.09
11 012-210-015-000 $90.09
12 012-210-016-000 $90.09
13 012-210-017-000 $90.09
14 012-210-018-000 $90.09
15 012-210-019-000 $90.09
16 012-210-020-000 $90.09
17 012-210-021-000 $90.09
18 012-210-022-000 $90.09
19 012-210-023-000 $90.09
20 012-210-024-000 $90.09
21 012-210-025-000 $90.09
22 012-210-026-000 $90.09
23 012-210-027-000 $90.09
24 012-210-028-000 $90.09
25 012-210-029-000 $90.09
26 012-210-030-000 $90.09
27 012-210-031-000 $90.09
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
ZONE 30 - YOSEMITE ESTATES
TOTAL ASSESSMENT:
$2,702.70
LANDSCAPE MAINTENANCE DISTRICT
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 012-210-032-000 $90.09
29 012-210-033-000 $90.09
30 012-210-034-000 $90.09
TOTAL $2,702.70
1. BEGINNING FUND BALANCE $ (5,247.43)
2. LANDSCAPE MAINTENANCE COSTS $ 13,592.04
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 606.03
b. ENGINEERING ADMINISTRATION $ 280.82
c. LEGAL ADMINISTRATION $ 59.92
d. FINANCE ADMINISTRATION $ 41.66
e. TREE TRIMMING $ 1,868.00
f. GAS & UTILITIES $ 1,840.47
g. EQUIPMENT g. 1,172.81
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 98.62
i. MADERA COUNTY PROCESSING FEES $ 82.72
TOTAL COSTS: $ 19,643.09
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE (10,185.26)
5. TOTAL ASSESSMENT $ 14,705.26
6. AVERAGE ASSESSMENT PER PARCEL 156.44
CITY OF MADERA
ZONE 31A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-430-001-000 $156.44 36 012-430-036-000 $156.44
2 012-430-002-000 $156.44 37 012-430-037-000 $156.44
3 012-430-003-000 $156.44 38 012-431-001-000 $156.44
4 012-430-004-000 $156.44 39 012-431-002-000 $156.44
5 012-430-005-000 $156.44 40 012-431-003-000 $156.44
6 012-430-006-000 $156.44 41 012-431-004-000 $156.44
7 012-430-007-000 $156.44 42 012-431-005-000 $156.44
8 012-430-008-000 $156.44 43 012-431-006-000 $156.44
9 012-430-009-000 $156.44 44 012-431-007-000 $156.44
10 012-430-010-000 $156.44 45 012-431-008-000 $156.44
11 012-430-011-000 $156.44 46 012-431-009-000 $156.44
12 012-430-012-000 $156.44 47 012-431-010-000 $156.44
13 012-430-013-000 $156.44 48 012-431-011-000 $156.44
14 012-430-014-000 $156.44 49 012-431-012-000 $156.44
15 012-430-015-000 $156.44 50 012-431-013-000 $156.44
16 012-430-016-000 $156.44 51 012-431-014-000 $156.44
17 012-430-017-000 $156.44 52 012-431-015-000 $156.44
18 012-430-018-000 $156.44 53 012-431-016-000 $156.44
19 012-430-019-000 $156.44 54 012-431-017-000 $156.44
20 012-430-020-000 $156.44 55 012-431-018-000 $156.44
21 012-430-021-000 $156.44 56 012-431-019-000 $156.44
22 012-430-022-000 $156.44 57 012-431-020-000 $156.44
23 012-430-023-000 $156.44 58 012-431-021-000 $156.44
24 012-430-024-000 $156.44 59 012-431-022-000 $156.44
25 012-430-025-000 $156.44 60 012-431-023-000 $156.44
26 012-430-026-000 $156.44 61 012-431-024-000 $156.44
27 012-430-027-000 $156.44 62 012-431-025-000 $156.44
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 31A - HIGHLANDS I
TOTAL ASSESSMENT:
$14,705.26
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 012-430-028-000 $156.44 63 012-431-026-000 $156.44
29 012-430-029-000 $156.44 64 012-431-027-000 $156.44
30 012-430-030-000 $156.44 65 012-431-028-000 $156.44
31 012-430-031-000 $156.44 66 012-431-029-000 $156.44
32 012-430-032-000 $156.44 67 012-431-030-000 $156.44
33 012-430-033-000 $156.44 68 012-431-031-000 $156.44
34 012-430-034-000 $156.44 69 012-431-032-000 $156.44
35 012-430-035-000 $156.44 70 012-431-033-000 $156.44
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 012-431-034-000 $156.44
72 012-431-035-000 $156.44
73 012-431-036-000 $156.44
74 012-431-037-000 $156.44
75 012-431-038-000 $156.44
76 012-431-039-000 $156.44
77 012-431-040-000 $156.44
78 012-431-041-000 $156.44
79 012-431-042-000 $156.44
80 012-431-043-000 $156.44
81 012-431-044-000 $156.44
82 012-431-045-000 $156.44
83 012-431-046-000 $156.44
84 012-431-047-000 $156.44
85 012-431-048-000 $156.44
86 012-431-049-000 $156.44
87 012-431-050-000 $156.44
88 012-431-051-000 $156.44
89 012-431-052-000 $156.44
90 012-431-053-000 $156.44
91 012-431-054-000 $156.44
92 012-431-055-000 $156.44
93 012-431-056-000 $156.44
94 012-431-057-000 $156.44
TOTAL: $14,705.26
1. BEGINNING FUND BALANCE $ 36,606.51
2. LANDSCAPE MAINTENANCE COSTS $ 27,885.81
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 715.28
b. ENGINEERING ADMINISTRATION $ 697.85
c. LEGAL ADMINISTRATION $ 148.91
d. FINANCE ADMINISTRATION $ 103.53
e. TREE TRIMMING $ 2,588.00
f. GAS & UTILITIES $ 2,767.88
g. EQUIPMENT g. 1,168.71
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 82.51
i. MADERA COUNTY PROCESSING FEES $ 217.36
TOTAL COSTS: $ 36,375.85
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 34,211.80
5. TOTAL ASSESSMENT $ 33,981.13
6. AVERAGE ASSESSMENT PER PARCEL 137.58
CITY OF MADERA
ZONE 31B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Assessment Number Number Assessment 1 012-371-001-000 $125.58 36 012-372-009-000 $125.58
2 012-371-002-000 $125.58 37 012-372-010-000 $125.58
3 012-371-003-000 $125.58 38 012-372-011-000 $125.58
4 012-371-004-000 $125.58 39 012-372-012-000 $125.58
5 012-371-005-000 $125.58 40 012-372-013-000 $125.58
6 012-371-006-000 $125.58 41 012-372-014-000 $125.58
7 012-371-007-000 $125.58 42 012-372-015-000 $125.58
8 012-371-008-000 $125.58 43 012-372-016-000 $125.58
9 012-371-009-000 $125.58 44 012-372-017-000 $125.58
10 012-371-010-000 $125.58 45 012-372-018-000 $125.58
11 012-371-011-000 $125.58 46 012-372-019-000 $125.58
12 012-371-012-000 $125.58 47 012-372-020-000 $125.58
13 012-371-013-000 $125.58 48 012-372-021-000 $125.58
14 012-371-014-000 $125.58 49 012-372-022-000 $125.58
15 012-371-015-000 $125.58 50 012-372-023-000 $125.58
16 012-371-016-000 $125.58 51 012-372-024-000 $125.58
17 012-371-017-000 $125.58 52 012-373-001-000 $125.58
18 012-371-018-000 $125.58 53 012-373-002-000 $125.58
19 012-371-019-000 $125.58 54 012-373-003-000 $125.58
20 012-371-020-000 $125.58 55 012-373-004-000 $125.58
21 012-371-021-000 $125.58 56 012-373-005-000 $125.58
22 012-371-022-000 $125.58 57 012-373-006-000 $125.58
23 012-371-023-000 $125.58 58 012-373-007-000 $125.58
24 012-371-024-000 $125.58 59 012-373-008-000 $125.58
25 012-371-025-000 $125.58 60 012-373-009-000 $125.58
26 012-371-026-000 $125.58 61 012-373-010-000 $125.58
27 012-371-027-000 $125.58 62 012-373-011-000 $125.58
ASSESSMENT ROLL
2013-2014 ASSESSMENT
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 31B - HIGHLANDS II
TOTAL ASSESSMENT:
$33,981.13
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Assessment Number Number Assessment 28 012-372-001-000 $125.58 63 012-373-012-000 $125.58
29 012-372-002-000 $125.58 64 012-373-013-000 $125.58
30 012-372-003-000 $125.58 65 012-373-014-000 $125.58
31 012-372-004-000 $125.58 66 012-373-015-000 $125.58
32 012-372-005-000 $125.58 67 012-373-016-000 $125.58
33 012-372-006-000 $125.58 68 012-373-017-000 $125.58
34 012-372-007-000 $125.58 69 012-373-018-000 $125.58
35 012-372-008-000 $125.58 70 012-373-019-000 $125.58
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Assessment Number Number Assessment 71 012-373-020-000 $125.58 116 012-371-055-000 $125.58
72 012-373-021-000 $125.58 117 012-371-056-000 $125.58
73 012-373-022-000 $125.58 118 012-371-057-000 $125.58
74 012-373-023-000 $125.58 119 012-371-058-000 $125.58
75 012-373-024-000 $125.58 120 012-371-059-000 $125.58
76 012-372-025-000 $125.58 121 012-371-060-000 $125.58
77 012-372-026-000 $125.58 122 012-371-061-000 $125.58
78 012-372-027-000 $125.58 123 012-371-062-000 $125.58
79 012-372-028-000 $125.58 124 012-371-063-000 $125.58
80 012-372-029-000 $125.58 125 012-371-064-000 $125.58
81 012-372-030-000 $125.58 126 012-371-065-000 $125.58
82 012-372-031-000 $125.58 127 012-371-066-000 $125.58
83 012-372-032-000 $125.58 128 012-371-067-000 $125.58
84 012-372-033-000 $125.58 129 012-371-068-000 $125.58
85 012-372-034-000 $125.58 130 012-371-069-000 $125.58
86 012-372-035-000 $125.58 131 012-372-038-000 $125.58
87 012-372-071-000 $125.58 132 012-372-039-000 $125.58
88 012-372-072-000 $125.58 133 012-372-040-000 $125.58
89 012-371-028-000 $125.58 134 012-372-041-000 $125.58
90 012-371-029-000 $125.58 135 012-372-042-000 $125.58
91 012-371-030-000 $125.58 136 012-372-043-000 $125.58
92 012-371-031-000 $125.58 137 012-372-044-000 $125.58
93 012-371-032-000 $125.58 138 012-372-045-000 $125.58
94 012-371-033-000 $125.58 139 012-372-046-000 $125.58
95 012-371-034-000 $125.58 140 012-372-047-000 $125.58
96 012-371-035-000 $125.58 141 012-372-048-000 $125.58
97 012-371-036-000 $125.58 142 012-372-049-000 $125.58
98 012-371-037-000 $125.58 143 012-372-050-000 $125.58
99 012-371-038-000 $125.58 144 012-372-051-000 $125.58
100 012-371-039-000 $125.58 145 012-372-052-000 $125.58 101 012-371-040-000 $125.58 146 012-372-053-000 $125.58 102 012-371-041-000 $125.58 147 012-372-054-000 $125.58 103 012-371-042-000 $125.58 148 012-372-055-000 $125.58 104 012-371-043-000 $125.58 149 012-372-056-000 $125.58 105 012-371-044-000 $125.58 150 012-372-057-000 $125.58 106 012-371-045-000 $125.58 151 012-372-058-000 $125.58 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Assessment Number Number Assessment 107 012-371-046-000 $125.58 152 012-372-059-000 $125.58 108 012-371-047-000 $125.58 153 012-372-060-000 $125.58 109 012-371-048-000 $125.58 154 012-372-061-000 $125.58 110 012-371-049-000 $125.58 155 012-372-062-000 $125.58 111 012-371-050-000 $125.58 156 012-372-063-000 $125.58 112 012-371-051-000 $125.58 157 012-372-064-000 $125.58 113 012-371-052-000 $125.58 158 012-373-025-000 $125.58 114 012-371-053-000 $125.58 159 012-373-026-000 $176.98 115 012-371-054-000 $125.58 160 012-373-027-000 $125.58 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Assessment Number Number Assessment 161 012-373-028-000 $176.98 206 012-373-056-000 $125.58 162 012-373-029-000 $125.58 207 012-373-057-000 $176.98 163 012-373-030-000 $133.16 208 012-373-058-000 $176.98 164 012-373-031-000 $176.98 209 012-374-018-000 $176.98 165 012-373-032-000 $125.58 210 012-374-019-000 $176.98 166 012-373-033-000 $176.98 211 012-374-020-000 $176.98 167 012-373-034-000 $176.98 212 012-374-021-000 $132.94 168 012-373-035-000 $176.98 213 012-374-022-000 $125.58 169 012-373-036-000 $176.98 214 012-374-023-000 $176.98 170 012-373-037-000 $176.98 215 012-374-024-000 $125.58 171 012-373-038-000 $176.98 216 012-374-025-000 $176.98 172 012-373-039-000 $125.58 217 012-374-026-000 $155.72 173 012-373-040-000 $125.58 218 012-374-027-000 $125.58 174 012-373-041-000 $176.98 219 012-374-028-000 $142.40 175 012-373-042-000 $125.58 220 012-374-029-000 $125.58 176 012-373-043-000 $125.58 221 012-374-030-000 $176.98 177 012-373-044-000 $176.98 222 012-374-031-000 $176.98 178 012-373-045-000 $125.58 223 012-374-032-000 $176.98 179 012-373-046-000 $176.98 224 012-374-033-000 $173.30 180 012-373-047-000 $176.98 225 012-374-034-000 $176.98 181 012-374-001-000 $176.98 226 012-374-035-000 $151.10 182 012-374-002-000 $125.58 227 012-374-036-000 $176.98 183 012-374-003-000 $176.98 228 012-374-037-000 $125.58 184 012-374-004-000 $176.98 229 012-374-038-000 $171.08 185 012-374-005-000 $176.98 230 012-374-039-000 $176.98 186 012-374-006-000 $176.98 231 012-374-040-000 $132.66 187 012-374-007-000 $125.58 232 012-373-059-000 $125.58 188 012-374-008-000 $176.98 233 012-373-060-000 $176.98 189 012-374-009-000 $176.98 234 012-373-061-000 $176.98 190 012-373-048-000 $125.58 235 012-373-062-000 $176.98 191 012-373-049-000 $125.58 236 012-373-063-000 $176.98 192 012-373-050-000 $125.58 237 012-373-064-000 $176.98 193 012-373-051-000 $125.58 238 012-373-065-000 $176.98 194 012-373-052-000 $125.58 239 012-373-066-000 $125.58 195 012-374-010-000 $125.58 240 012-373-067-000 $176.98 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Assessment Number Number Assessment 196 012-374-011-000 $176.98 241 012-373-068-000 $176.98 197 012-374-012-000 $176.98 242 012-373-069-000 $176.98 198 012-374-013-000 $176.98 243 012-373-070-000 $125.58 199 012-374-014-000 $176.98 244 012-373-071-000 $176.98 200 012-374-015-000 $176.98 245 012-372-065-000 $176.98 201 012-374-016-000 $125.58 246 012-372-066-000 $125.58 202 012-374-017-000 $176.98 247 012-372-067-000 $176.98 203 012-373-053-000 $176.98
204 012-373-054-000 $176.98
205 012-373-055-000 $176.98
TOTAL $33,981.13
1. BEGINNING FUND BALANCE $ 2,644.45
2. LANDSCAPE MAINTENANCE COSTS $ 5,623.68
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 317.67
b. ENGINEERING ADMINISTRATION $ 149.99
c. LEGAL ADMINISTRATION $ 32.00
d. FINANCE ADMINISTRATION $ 22.25
e. TREE TRIMMING $ 698.00
f. GAS & UTILITIES $ 523.35
g. EQUIPMENT g. 231.79
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 170.09
i. MADERA COUNTY PROCESSING FEES $ 40.48
TOTAL COSTS: $ 7,809.31
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 205.09
5. TOTAL ASSESSMENT $ 5,369.96
6. AVERAGE ASSESSMENT PER PARCEL 116.74
CITY OF MADERA
ZONE 32A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-270-001-000 $116.74 36 005-270-036-000 $116.74
2 005-270-002-000 $116.74 37 005-270-037-000 $116.74
3 005-270-047-000 $116.74 38 005-270-038-000 $116.74
4 005-270-048-000 $116.74 39 005-270-039-000 $116.74
5 005-270-049-000 $116.74 40 005-270-040-000 $116.74
6 005-270-050-000 $116.74 41 005-270-041-000 $116.74
7 005-270-007-000 $116.74 42 005-270-042-000 $116.74
8 005-270-008-000 $116.74 43 005-270-043-000 $116.74
9 005-270-009-000 $116.74 44 005-270-044-000 $116.74
10 005-270-010-000 $116.74 45 005-270-053-000 $116.74
11 005-270-011-000 $116.74 46 005-270-054-000 $116.74
12 005-270-012-000 $116.74
13 005-270-013-000 $116.74 TOTAL $5,369.96
14 005-270-014-000 $116.74
15 005-270-015-000 $116.74
16 005-270-016-000 $116.74
17 005-270-017-000 $116.74
18 005-270-018-000 $116.74
19 005-270-019-000 $116.74
20 005-270-020-000 $116.74
21 005-270-021-000 $116.74
22 005-270-022-000 $116.74
23 005-270-023-000 $116.74
24 005-270-024-000 $116.74
25 005-270-025-000 $116.74
26 005-270-026-000 $116.74
27 005-270-027-000 $116.74
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 32A - LA JOLLA ESTATES NORTH PHASE I
TOTAL ASSESSMENT:
$5,369.96
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-270-028-000 $116.74
29 005-270-029-000 $116.74
30 005-270-030-000 $116.74
31 005-270-051-000 $116.74
32 005-270-032-000 $116.74
33 005-270-033-000 $116.74
34 005-270-034-000 $116.74
35 005-270-035-000 $116.74
1. BEGINNING FUND BALANCE $ 5,293.31
2. LANDSCAPE MAINTENANCE COSTS $ 4,227.61
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 294.93
b. ENGINEERING ADMINISTRATION $ 152.71
c. LEGAL ADMINISTRATION $ 32.59
d. FINANCE ADMINISTRATION $ 22.66
e. TREE TRIMMING $ 743.00
f. GAS & UTILITIES $ 347.10
g. EQUIPMENT g. 172.68
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 289.54
i. MADERA COUNTY PROCESSING FEES $ 41.36
TOTAL COSTS: $ 6,324.18
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 3,427.62
5. TOTAL ASSESSMENT $ 4,458.50
6. AVERAGE ASSESSMENT PER PARCEL 94.86
CITY OF MADERA
ZONE 32B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-280-001-000 $94.86 36 005-280-036-000 $94.86
2 005-280-002-000 $94.86 37 005-280-037-000 $94.86
3 005-280-003-000 $94.86 38 005-280-038-000 $94.86
4 005-280-004-000 $94.86 39 005-280-039-000 $94.86
5 005-280-005-000 $94.86 40 005-280-040-000 $94.86
6 005-280-006-000 $94.86 41 005-280-041-000 $94.86
7 005-280-007-000 $94.86 42 005-280-042-000 $94.86
8 005-280-008-000 $94.86 43 005-280-043-000 $94.86
9 005-280-009-000 $94.86 44 005-280-044-000 $94.86
10 005-280-010-000 $94.86 45 005-280-045-000 $94.86
11 005-280-011-000 $94.86 46 005-280-046-000 $94.86
12 005-280-012-000 $94.86 47 005-280-047-000 $94.86
13 005-280-013-000 $94.86
14 005-280-014-000 $94.86
15 005-280-015-000 $94.86 TOTAL $4,458.50
16 005-280-016-000 $94.86
17 005-280-017-000 $94.86
18 005-280-018-000 $94.86
19 005-280-019-000 $94.86
20 005-280-020-000 $94.86
21 005-280-021-000 $94.86
22 005-280-022-000 $94.86
23 005-280-023-000 $94.86
24 005-280-024-000 $94.86
25 005-280-025-000 $94.86
26 005-280-026-000 $94.86
27 005-280-027-000 $94.86
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 32B - LA JOLLA ESTATES NORTH PHASE II
TOTAL ASSESSMENT:
$4,458.50
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-280-028-000 $94.86
29 005-280-029-000 $94.86
30 005-280-030-000 $94.86
31 005-280-031-000 $94.86
32 005-280-032-000 $94.86
33 005-280-033-000 $94.86
34 005-280-034-000 $94.86
35 005-280-035-000 $94.86
1. BEGINNING FUND BALANCE $ 5,383.25
2. LANDSCAPE MAINTENANCE COSTS $ 6,285.61
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 320.86
b. ENGINEERING ADMINISTRATION $ 190.87
c. LEGAL ADMINISTRATION $ 40.73
d. FINANCE ADMINISTRATION $ 28.32
e. TREE TRIMMING $ 630.00
f. GAS & UTILITIES $ 269.96
g. EQUIPMENT g. 258.14
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 30.68
i. MADERA COUNTY PROCESSING FEES $ 53.68
TOTAL COSTS: $ 8,108.84
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 4,533.38
5. TOTAL ASSESSMENT $ 7,258.97
6. AVERAGE ASSESSMENT PER PARCEL 119.00
CITY OF MADERA
ZONE 33
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-360-004-000 $119.00 36 012-360-039-000 $119.00
2 012-360-005-000 $119.00 37 012-360-040-000 $119.00
3 012-360-006-000 $119.00 38 012-360-041-000 $119.00
4 012-360-007-000 $119.00 39 012-360-042-000 $119.00
5 012-360-008-000 $119.00 40 012-360-043-000 $119.00
6 012-360-009-000 $119.00 41 012-360-044-000 $119.00
7 012-360-010-000 $119.00 42 012-360-045-000 $119.00
8 012-360-011-000 $119.00 43 012-360-046-000 $119.00
9 012-360-012-000 $119.00 44 012-360-047-000 $119.00
10 012-360-013-000 $119.00 45 012-360-048-000 $119.00
11 012-360-014-000 $119.00 46 012-360-049-000 $119.00
12 012-360-015-000 $119.00 47 012-360-050-000 $119.00
13 012-360-016-000 $119.00 48 012-360-051-000 $119.00
14 012-360-017-000 $119.00 49 012-360-052-000 $119.00
15 012-360-018-000 $119.00 50 012-360-053-000 $119.00
16 012-360-019-000 $119.00 51 012-360-054-000 $119.00
17 012-360-020-000 $119.00 52 012-360-055-000 $119.00
18 012-360-021-000 $119.00 53 012-360-056-000 $119.00
19 012-360-022-000 $119.00 54 012-360-057-000 $119.00
20 012-360-023-000 $119.00 55 012-360-058-000 $119.00
21 012-360-024-000 $119.00 56 012-360-059-000 $119.00
22 012-360-025-000 $119.00 57 012-360-060-000 $119.00
23 012-360-026-000 $119.00 58 012-360-061-000 $119.00
24 012-360-027-000 $119.00 59 012-360-062-000 $119.00
25 012-360-028-000 $119.00 60 012-360-063-000 $119.00
26 012-360-029-000 $119.00 61 012-360-064-000 $119.00
27 012-360-030-000 $119.00
LANDSCAPE MAINTENANCE DISTRICT
ZONE 33 - SOUTH STAR
TOTAL ASSESSMENT:
$7,258.97
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 012-360-031-000 $119.00 TOTAL $7,258.97
29 012-360-032-000 $119.00
30 012-360-033-000 $119.00
31 012-360-034-000 $119.00
32 012-360-035-000 $119.00
33 012-360-036-000 $119.00
34 012-360-037-000 $119.00
35 012-360-038-000 $119.00
1. BEGINNING FUND BALANCE $ 973.43
2. LANDSCAPE MAINTENANCE COSTS $ 8,760.13
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 334.99
b. ENGINEERING ADMINISTRATION $ 299.90
c. LEGAL ADMINISTRATION $ 63.99
d. FINANCE ADMINISTRATION $ 44.49
e. TREE TRIMMING $ 743.00
f. GAS & UTILITIES $ 460.52
g. EQUIPMENT g. 303.19
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 133.72
i. MADERA COUNTY PROCESSING FEES $ 88.88
TOTAL COSTS: $ 11,232.81
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 2,132.47
5. TOTAL ASSESSMENT $ 12,391.84
6. AVERAGE ASSESSMENT PER PARCEL 122.69
CITY OF MADERA
ZONE 34
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-300-001-000 $122.69 36 005-300-036-000 $122.69
2 005-300-002-000 $122.69 37 005-300-037-000 $122.69
3 005-300-003-000 $122.69 38 005-300-038-000 $122.69
4 005-300-004-000 $122.69 39 005-300-039-000 $122.69
5 005-300-005-000 $122.69 40 005-300-040-000 $122.69
6 005-300-006-000 $122.69 41 005-300-041-000 $122.69
7 005-300-007-000 $122.69 42 005-300-042-000 $122.69
8 005-300-008-000 $122.69 43 005-300-043-000 $122.69
9 005-300-009-000 $122.69 44 005-300-044-000 $122.69
10 005-300-010-000 $122.69 45 005-300-045-000 $122.69
11 005-300-011-000 $122.69 46 005-300-046-000 $122.69
12 005-300-012-000 $122.69 47 005-300-047-000 $122.69
13 005-300-013-000 $122.69 48 005-300-048-000 $122.69
14 005-300-014-000 $122.69 49 005-300-049-000 $122.69
15 005-300-015-000 $122.69 50 005-300-050-000 $122.69
16 005-300-016-000 $122.69 51 005-300-051-000 $122.69
17 005-300-017-000 $122.69 52 005-300-052-000 $122.69
18 005-300-018-000 $122.69 53 005-301-001-000 $122.69
19 005-300-019-000 $122.69 54 005-301-002-000 $122.69
20 005-300-020-000 $122.69 55 005-301-003-000 $122.69
21 005-300-021-000 $122.69 56 005-301-004-000 $122.69
22 005-300-022-000 $122.69 57 005-301-005-000 $122.69
23 005-300-023-000 $122.69 58 005-301-006-000 $122.69
24 005-300-024-000 $122.69 59 005-301-007-000 $122.69
25 005-300-025-000 $122.69 60 005-301-008-000 $122.69
26 005-300-026-000 $122.69 61 005-301-009-000 $122.69
27 005-300-027-000 $122.69 62 005-301-010-000 $122.69
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 34 - KENNEDY ESTATES PHASE I & II
TOTAL ASSESSMENT:
$12,391.84
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-300-028-000 $122.69 63 005-301-011-000 $122.69
29 005-300-029-000 $122.69 64 005-301-012-000 $122.69
30 005-300-030-000 $122.69 65 005-301-013-000 $122.69
31 005-300-031-000 $122.69 66 005-301-014-000 $122.69
32 005-300-032-000 $122.69 67 005-301-015-000 $122.69
33 005-300-033-000 $122.69 68 005-301-016-000 $122.69
34 005-300-034-000 $122.69 69 005-301-017-000 $122.69
35 005-300-035-000 $122.69 70 005-301-018-000 $122.69
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 005-301-019-000 $122.69
72 005-301-020-000 $122.69
73 005-301-021-000 $122.69
74 005-301-022-000 $122.69
75 005-301-023-000 $122.69
76 005-301-024-000 $122.69
77 005-301-025-000 $122.69
78 005-301-026-000 $122.69
79 005-301-027-000 $122.69
80 005-301-028-000 $122.69
81 005-301-029-000 $122.69
82 005-301-030-000 $122.69
83 005-301-031-000 $122.69
84 005-301-032-000 $122.69
85 005-301-033-000 $122.69
86 005-301-034-000 $122.69
87 005-301-035-000 $122.69
88 005-301-036-000 $122.69
89 005-301-037-000 $122.69
90 005-301-038-000 $122.69
91 005-301-039-000 $122.69
92 005-301-040-000 $122.69
93 005-301-041-000 $122.69
94 005-301-042-000 $122.69
95 005-301-043-000 $122.69
96 005-301-044-000 $122.69
97 005-301-045-000 $122.69
98 005-301-046-000 $122.69
99 005-301-047-000 $122.69
100 005-301-048-000 $122.69
101 005-301-049-000 $122.69
TOTAL $12,391.84
1. BEGINNING FUND BALANCE $ 27,080.47
2. LANDSCAPE MAINTENANCE COSTS $ 2,665.38
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 337.27
b. ENGINEERING ADMINISTRATION $ 163.61
c. LEGAL ADMINISTRATION $ 34.91
d. FINANCE ADMINISTRATION $ 24.27
e. TREE TRIMMING $ 383.00
f. GAS & UTILITIES $ 536.21
g. EQUIPMENT g. 164.79
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 107.74
i. MADERA COUNTY PROCESSING FEES $ 44.88
TOTAL COSTS: $ 4,462.07
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 22,618.40
5. TOTAL ASSESSMENT $ 0.00
6. AVERAGE ASSESSMENT PER PARCEL 0.00
CITY OF MADERA
ZONE 34B
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-303-001-000 $0.00 36 005-303-037-000 $0.00
2 005-303-002-000 $0.00 37 005-303-038-000 $0.00
3 005-303-003-000 $0.00 38 005-303-039-000 $0.00
4 005-303-004-000 $0.00 39 005-303-040-000 $0.00
5 005-303-005-000 $0.00 40 005-303-041-000 $0.00
6 005-303-006-000 $0.00 41 005-303-042-000 $0.00
7 005-303-007-000 $0.00 42 005-303-043-000 $0.00
8 005-303-008-000 $0.00 43 005-303-044-000 $0.00
9 005-303-009-000 $0.00 44 005-303-045-000 $0.00
10 005-303-010-000 $0.00 45 005-303-046-000 $0.00
11 005-303-011-000 $0.00 46 005-303-047-000 $0.00
12 005-303-012-000 $0.00 47 005-303-048-000 $0.00
13 005-303-013-000 $0.00 48 005-303-049-000 $0.00
14 005-303-014-000 $0.00 49 005-303-050-000 $0.00
15 005-303-015-000 $0.00 50 005-303-051-000 $0.00
16 005-303-016-000 $0.00 51 005-303-052-000 $0.00
17 005-303-017-000 $0.00
18 005-303-019-000 $0.00 TOTAL $0.00
19 005-303-020-000 $0.00
20 005-303-021-000 $0.00
21 005-303-022-000 $0.00
22 005-303-023-000 $0.00
23 005-303-024-000 $0.00
24 005-303-025-000 $0.00
25 005-303-026-000 $0.00
26 005-303-027-000 $0.00
27 005-303-028-000 $0.00
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$0.00
LANDSCAPE MAINTENANCE DISTRICT
ZONE 34B
Kennedy Estates Phase 3
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-303-029-000 $0.00
29 005-303-030-000 $0.00
30 005-303-031-000 $0.00
31 005-303-032-000 $0.00
32 005-303-033-000 $0.00
33 005-303-034-000 $0.00
34 005-303-035-000 $0.00
35 005-303-036-000 $0.00
1. BEGINNING FUND BALANCE $ 5,855.87
2. LANDSCAPE MAINTENANCE COSTS $ 8.56
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 337.27
b. ENGINEERING ADMINISTRATION $ 163.61
c. LEGAL ADMINISTRATION $ 34.91
d. FINANCE ADMINISTRATION $ 24.27
e. TREE TRIMMING $ 383.00
f. GAS & UTILITIES $ 332.49
g. EQUIPMENT g. 164.79
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 107.74
i. MADERA COUNTY PROCESSING FEES $ 44.88
TOTAL COSTS: $ 1,601.54
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 5,904.33
5. TOTAL ASSESSMENT $ 1,650.00
6. AVERAGE ASSESSMENT PER PARCEL 32.35
CITY OF MADERA
ZONE 34C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 005-304-001-000 $32.35 36 005-304-036-000 $32.35
2 005-304-002-000 $32.35 37 005-304-037-000 $32.35
3 005-304-003-000 $32.35 38 005-304-038-000 $32.35
4 005-304-004-000 $32.35 39 005-304-039-000 $32.35
5 005-304-005-000 $32.35 40 005-304-040-000 $32.35
6 005-304-006-000 $32.35 41 005-304-041-000 $32.35
7 005-304-007-000 $32.35 42 005-304-042-000 $32.35
8 005-304-008-000 $32.35 43 005-304-043-000 $32.35
9 005-304-009-000 $32.35 44 005-304-044-000 $32.35
10 005-304-010-000 $32.35 45 005-304-045-000 $32.35
11 005-304-011-000 $32.35 46 005-304-046-000 $32.35
12 005-304-012-000 $32.35 47 005-304-047-000 $32.35
13 005-304-013-000 $32.35 48 005-304-048-000 $32.35
14 005-304-014-000 $32.35 49 005-304-049-000 $32.35
15 005-304-015-000 $32.35 50 005-304-050-000 $32.35
16 005-304-016-000 $32.35 51 005-304-051-000 $32.35
17 005-304-017-000 $32.35
18 005-304-018-000 $32.35 TOTAL $1,650.00
19 005-304-019-000 $32.35
20 005-304-020-000 $32.35
21 005-304-021-000 $32.35
22 005-304-022-000 $32.35
23 005-304-023-000 $32.35
24 005-304-024-000 $32.35
25 005-304-025-000 $32.35
26 005-304-026-000 $32.35
27 005-304-027-000 $32.35
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$1,650.00
LANDSCAPE MAINTENANCE DISTRICT
ZONE 34C
Kennedy Estates Phase 4
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 005-304-028-000 $32.35
29 005-304-029-000 $32.35
30 005-304-030-000 $32.35
31 005-304-031-000 $32.35
32 005-304-032-000 $32.35
33 005-304-033-000 $32.35
34 005-304-034-000 $32.35
35 005-304-035-000 $32.35
1. BEGINNING FUND BALANCE $ 3,421.78
2. LANDSCAPE MAINTENANCE COSTS $ 1,648.05
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 276.29
b. ENGINEERING ADMINISTRATION $ 269.92
c. LEGAL ADMINISTRATION $ 57.60
d. FINANCE ADMINISTRATION $ 40.04
e. TREE TRIMMING $ 203.00
f. GAS & UTILITIES $ 100.17
g. EQUIPMENT g. 93.04
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 20.45
i. MADERA COUNTY PROCESSING FEES $ 79.20
TOTAL COSTS: $ 2,787.75
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 3,361.00
5. TOTAL ASSESSMENT $ 2,726.06
6. AVERAGE ASSESSMENT PER PARCEL 30.30
CITY OF MADERA
ZONE 35
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-540-001-000 $30.29 36 009-540-036-000 $30.29
2 009-540-002-000 $30.29 37 009-540-037-000 $30.29
3 009-540-003-000 $30.29 38 009-540-038-000 $30.29
4 009-540-004-000 $30.29 39 009-540-039-000 $30.29
5 009-540-005-000 $30.29 40 009-540-040-000 $30.29
6 009-540-006-000 $30.29 41 009-540-041-000 $30.29
7 009-540-007-000 $30.29 42 009-540-042-000 $30.29
8 009-540-008-000 $30.29 43 009-540-043-000 $30.29
9 009-540-009-000 $30.29 44 009-540-044-000 $30.29
10 009-540-010-000 $30.29 45 009-540-045-000 $30.29
11 009-540-011-000 $30.29 46 009-540-046-000 $30.29
12 009-540-012-000 $30.29 47 009-540-047-000 $30.29
13 009-540-013-000 $30.29 48 009-540-048-000 $30.29
14 009-540-014-000 $30.29 49 009-540-049-000 $30.29
15 009-540-015-000 $30.29 50 009-540-050-000 $30.29
16 009-540-016-000 $30.29 51 009-540-051-000 $30.29
17 009-540-017-000 $30.29 52 009-540-052-000 $30.29
18 009-540-018-000 $30.29 53 009-540-053-000 $30.29
19 009-540-019-000 $30.29 54 009-540-054-000 $30.29
20 009-540-020-000 $30.29 55 009-540-055-000 $30.29
21 009-540-021-000 $30.29 56 009-540-056-000 $30.29
22 009-540-022-000 $30.29 57 009-540-057-000 $30.29
23 009-540-023-000 $30.29 58 009-540-058-000 $30.29
24 009-540-024-000 $30.29 59 009-540-059-000 $30.29
25 009-540-025-000 $30.29 60 009-540-060-000 $30.29
26 009-540-026-000 $30.29 61 009-540-061-000 $30.29
27 009-540-027-000 $30.29 62 009-540-062-000 $30.29
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 35 - SANTA BARBARA ESTATES
TOTAL ASSESSMENT:
$2,726.06
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 009-540-028-000 $30.29 63 009-540-063-000 $30.29
29 009-540-029-000 $30.29 64 009-540-064-000 $30.29
30 009-540-030-000 $30.29 65 009-540-065-000 $30.29
31 009-540-031-000 $30.29 66 009-540-066-000 $30.29
32 009-540-032-000 $30.29 67 009-540-067-000 $30.29
33 009-540-033-000 $30.29 68 009-540-068-000 $30.29
34 009-540-034-000 $30.29 69 009-540-069-000 $30.29
35 009-540-035-000 $30.29 70 009-540-070-000 $30.29
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 009-540-071-000 $30.29
72 009-540-072-000 $30.29
73 009-540-073-000 $30.29
74 009-540-074-000 $30.29
75 009-540-075-000 $30.29
76 009-540-076-000 $30.29
77 009-540-077-000 $30.29
78 009-540-078-000 $30.29
79 009-540-079-000 $30.29
80 009-540-080-000 $30.29
81 009-540-081-000 $30.29
82 009-540-082-000 $30.29
83 009-540-083-000 $30.29
84 009-540-084-000 $30.29
85 009-540-085-000 $30.29
86 009-540-086-000 $30.29
87 009-540-087-000 $30.29
88 009-540-088-000 $30.29
89 009-540-089-000 $30.29
90 009-540-090-000 $30.29
TOTAL $2,726.06
1. BEGINNING FUND BALANCE $ 15,507.16
2. LANDSCAPE MAINTENANCE COSTS $ 6,783.36
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 307.98
b. ENGINEERING ADMINISTRATION $ 411.65
c. LEGAL ADMINISTRATION $ 87.84
d. FINANCE ADMINISTRATION $ 61.07
e. TREE TRIMMING $ 990.00
f. GAS & UTILITIES $ 220.91
g. EQUIPMENT g. 387.93
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 109.17
i. MADERA COUNTY PROCESSING FEES $ 124.96
TOTAL COSTS: $ 9,484.88
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 13,780.51
5. TOTAL ASSESSMENT $ 7,756.81
6. AVERAGE ASSESSMENT PER PARCEL 54.64
CITY OF MADERA
ZONE 36A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-291-001-000 $54.63 36 011-292-012-000 $54.63
2 011-291-002-000 $54.63 37 011-292-013-000 $54.63
3 011-291-003-000 $54.63 38 011-292-014-000 $54.63
4 011-291-004-000 $54.63 39 011-292-015-000 $54.63
5 011-291-005-000 $54.63 40 011-292-016-000 $54.63
6 011-291-006-000 $54.63 41 011-292-017-000 $54.63
7 011-291-007-000 $54.63 42 011-292-018-000 $54.63
8 011-291-008-000 $54.63 43 011-292-019-000 $54.63
9 011-291-009-000 $54.63 44 011-292-020-000 $54.63
10 011-291-010-000 $54.63 45 011-292-021-000 $54.63
11 011-291-011-000 $54.63 46 011-292-022-000 $54.63
12 011-291-012-000 $54.63 47 011-292-023-000 $54.63
13 011-291-013-000 $54.63 48 011-292-024-000 $54.63
14 011-291-014-000 $54.63 49 011-292-025-000 $54.63
15 011-291-015-000 $54.63 50 011-292-026-000 $54.63
16 011-291-016-000 $54.63 51 011-292-027-000 $54.63
17 011-291-017-000 $54.63 52 011-292-028-000 $54.63
18 011-291-018-000 $54.63 53 011-292-029-000 $54.63
19 011-291-019-000 $54.63 54 011-292-030-000 $54.63
20 011-291-020-000 $54.63 55 011-292-031-000 $54.63
21 011-291-021-000 $54.63 56 011-292-032-000 $54.63
22 011-291-022-000 $54.63 57 011-292-033-000 $54.63
23 011-291-023-000 $54.63 58 011-292-034-000 $54.63
24 011-291-024-000 $54.63 59 011-292-035-000 $54.63
25 011-292-001-000 $54.63 60 011-292-036-000 $54.63
26 011-292-002-000 $54.63 61 011-292-037-000 $54.63
27 011-292-003-000 $54.63 62 011-292-038-000 $54.63
$7,756.81
LANDSCAPE MAINTENANCE DISTRICT
ZONE 36A
Mariposa Estates
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 011-292-004-000 $54.63 63 011-292-039-000 $54.63
29 011-292-005-000 $54.63 64 011-292-040-000 $54.63
30 011-292-006-000 $54.63 65 011-292-041-000 $54.63
31 011-292-007-000 $54.63 66 011-292-042-000 $54.63
32 011-292-008-000 $54.63 67 011-292-095-000 $54.63
33 011-292-009-000 $54.63 68 011-292-044-000 $54.63
34 011-292-010-000 $54.63 69 011-292-045-000 $54.63
35 011-292-011-000 $54.63 70 011-292-046-000 $54.63
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 011-292-047-000 $54.63 116 011-291-038-000 $54.63
72 011-291-025-000 $54.63 117 011-291-039-000 $54.63
73 011-291-026-000 $54.63 118 011-291-040-000 $54.63
74 011-291-027-000 $54.63 119 011-291-041-000 $54.63
75 011-291-028-000 $54.63 120 011-291-042-000 $54.63
76 011-291-029-000 $54.63 121 011-292-079-000 $54.63
77 011-291-030-000 $54.63 122 011-292-080-000 $54.63
78 011-291-031-000 $54.63 123 011-292-081-000 $54.63
79 011-291-032-000 $54.63 124 011-292-082-000 $54.63
80 011-291-033-000 $54.63 125 011-292-083-000 $54.63
81 011-291-034-000 $54.63 126 011-292-084-000 $54.63
82 011-291-035-000 $54.63 127 011-292-085-000 $54.63
83 011-291-036-000 $54.63 128 011-292-086-000 $54.63
84 011-292-048-000 $54.63 129 011-292-087-000 $54.63
85 011-292-049-000 $54.63 130 011-292-088-000 $54.63
86 011-292-050-000 $54.63 131 011-292-089-000 $54.63
87 011-292-051-000 $54.63 132 011-292-090-000 $54.63
88 011-292-052-000 $54.63 133 011-292-091-000 $54.63
89 011-292-053-000 $54.63 134 011-292-092-000 $54.63
90 011-292-054-000 $54.63 135 011-291-043-000 $54.63
91 011-292-055-000 $54.63 136 011-291-044-000 $54.63
92 011-292-056-000 $54.63 137 011-291-045-000 $54.63
93 011-292-096-000 $54.63 138 011-291-046-000 $54.63
94 011-292-058-000 $54.63 139 011-291-047-000 $54.63
95 011-292-059-000 $54.63 140 011-291-048-000 $54.63
96 011-292-060-000 $54.63 141 011-292-094-000 $54.63
97 011-292-061-000 $54.63 142 011-292-097-000 $54.63
98 011-292-062-000 $54.63
99 011-292-063-000 $54.63 TOTAL $7,756.81
100 011-292-064-000 $54.63
101 011-292-065-000 $54.63
102 011-292-066-000 $54.63
103 011-292-067-000 $54.63
104 011-292-068-000 $54.63
105 011-292-069-000 $54.63
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
106 011-292-070-000 $54.63
107 011-292-071-000 $54.63
108 011-292-072-000 $54.63
109 011-292-073-000 $54.63
110 011-292-074-000 $54.63
111 011-292-075-000 $54.63
112 011-292-076-000 $54.63
113 011-292-077-000 $54.63
114 011-292-078-000 $54.63
115 011-291-037-000 $54.63
1. BEGINNING FUND BALANCE $ 307.88
2. LANDSCAPE MAINTENANCE COSTS $ 397.41
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 253.81
b. ENGINEERING ADMINISTRATION $ 51.86
c. LEGAL ADMINISTRATION $ 11.07
d. FINANCE ADMINISTRATION $ 7.69
e. TREE TRIMMING $ 0.00
f. GAS & UTILITIES $ 220.91
g. EQUIPMENT g. 22.77
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 5.37
i. MADERA COUNTY PROCESSING FEES $ 8.80
TOTAL COSTS: $ 979.69
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 682.77
5. TOTAL ASSESSMENT $ 1,354.48
6. AVERAGE ASSESSMENT PER PARCEL 135.46
CITY OF MADERA
ZONE 36B
2024-25
$1,354.48
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-260-008-000 $135.45
2 011-260-009-000 $135.45
3 011-260-010-000 $135.45
4 011-260-011-000 $135.45
5 011-260-012-000 $135.45
6 011-260-013-000 $135.45
7 011-260-014-000 $135.45
8 011-260-015-000 $135.45
9 011-260-016-000 $135.45
10 011-260-017-000 $135.45
Total $1,354.48
Mariposa Estates II
TOTAL ASSESSMENT:
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 36B
1. BEGINNING FUND BALANCE $ 982.87
2. LANDSCAPE MAINTENANCE COSTS $ 2,637.97
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 281.12
b. ENGINEERING ADMINISTRATION $ 149.99
c. LEGAL ADMINISTRATION $ 32.00
d. FINANCE ADMINISTRATION $ 22.25
e. TREE TRIMMING $ 293.00
f. GAS & UTILITIES $ 118.56
g. EQUIPMENT g. 110.85
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 47.27
i. MADERA COUNTY PROCESSING FEES $ 40.48
TOTAL COSTS: $ 3,733.49
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 2,073.08
5. TOTAL ASSESSMENT $ 4,823.70
6. AVERAGE ASSESSMENT PER PARCEL 104.86
CITY OF MADERA
ZONE 36C
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-272-002-000 $104.86 36 011-272-037-000 $104.86
2 011-272-003-000 $104.86 37 011-272-038-000 $104.86
3 011-272-004-000 $104.86 38 011-272-039-000 $104.86
4 011-272-005-000 $104.86 39 011-272-040-000 $104.86
5 011-272-006-000 $104.86 40 011-272-041-000 $104.86
6 011-272-007-000 $104.86 41 011-272-042-000 $104.86
7 011-272-008-000 $104.86 42 011-272-043-000 $104.86
8 011-272-009-000 $104.86 43 011-272-044-000 $104.86
9 011-272-010-000 $104.86 44 011-272-045-000 $104.86
10 011-272-011-000 $104.86 45 011-272-046-000 $104.86
11 011-272-012-000 $104.86 46 011-272-047-000 $104.86
12 011-272-013-000 $104.86
13 011-272-014-000 $104.86 TOTAL $4,823.70
14 011-272-015-000 $104.86
15 011-272-016-000 $104.86
16 011-272-017-000 $104.86
17 011-272-018-000 $104.86
18 011-272-019-000 $104.86
19 011-272-020-000 $104.86
20 011-272-021-000 $104.86
21 011-272-022-000 $104.86
22 011-272-023-000 $104.86
23 011-272-024-000 $104.86
24 011-272-025-000 $104.86
25 011-272-026-000 $104.86
26 011-272-027-000 $104.86
27 011-272-028-000 $104.86
LANDSCAPE MAINTENANCE DISTRICT
ZONE 36C - OLIVE ESTATES
TOTAL ASSESSMENT:
$4,823.70
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 011-272-029-000 $104.86
29 011-272-030-000 $104.86
30 011-272-031-000 $104.86
31 011-272-032-000 $104.86
32 011-272-033-000 $104.86
33 011-272-034-000 $104.86
34 011-272-035-000 $104.86
35 011-272-036-000 $104.86
1. BEGINNING FUND BALANCE $ 2,661.14
2. LANDSCAPE MAINTENANCE COSTS $ 1,586.21
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 275.21
b. ENGINEERING ADMINISTRATION $ 297.17
c. LEGAL ADMINISTRATION $ 63.41
d. FINANCE ADMINISTRATION $ 44.09
e. TREE TRIMMING $ 383.00
f. GAS & UTILITIES $ 96.06
g. EQUIPMENT g. 89.58
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 30.68
i. MADERA COUNTY PROCESSING FEES $ 88.00
TOTAL COSTS: $ 2,953.42
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 2,662.67
5. TOTAL ASSESSMENT $ 2,954.95
6. AVERAGE ASSESSMENT PER PARCEL 29.55
CITY OF MADERA
ZONE 37
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-560-001-000 $29.55 36 009-561-019-000 $29.55
2 009-560-002-000 $29.55 37 009-561-020-000 $29.55
3 009-560-003-000 $29.55 38 009-561-021-000 $29.55
4 009-560-004-000 $29.55 39 009-561-022-000 $29.55
5 009-560-005-000 $29.55 40 009-561-023-000 $29.55
6 009-560-006-000 $29.55 41 009-561-024-000 $29.55
7 009-560-007-000 $29.55 42 009-561-025-000 $29.55
8 009-560-008-000 $29.55 43 009-561-026-000 $29.55
9 009-560-009-000 $29.55 44 009-561-027-000 $29.55
10 009-560-010-000 $29.55 45 009-561-028-000 $29.55
11 009-560-011-000 $29.55 46 009-561-029-000 $29.55
12 009-560-012-000 $29.55 47 009-561-030-000 $29.55
13 009-560-013-000 $29.55 48 009-561-031-000 $29.55
14 009-560-014-000 $29.55 49 009-561-032-000 $29.55
15 009-560-015-000 $29.55 50 009-561-033-000 $29.55
16 009-560-016-000 $29.55 51 009-560-018-000 $29.55
17 009-560-017-000 $29.55 52 009-560-019-000 $29.55
18 009-561-001-000 $29.55 53 009-560-020-000 $29.55
19 009-561-002-000 $29.55 54 009-560-021-000 $29.55
20 009-561-003-000 $29.55 55 009-560-022-000 $29.55
21 009-561-004-000 $29.55 56 009-560-023-000 $29.55
22 009-561-005-000 $29.55 57 009-560-024-000 $29.55
23 009-561-006-000 $29.55 58 009-560-025-000 $29.55
24 009-561-007-000 $29.55 59 009-560-026-000 $29.55
25 009-561-008-000 $29.55 60 009-560-027-000 $29.55
26 009-561-009-000 $29.55 61 009-560-028-000 $29.55
27 009-561-010-000 $29.55 62 009-560-029-000 $29.55
$2,954.95
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 37 - ALMOND TREE ESTATES
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 009-561-011-000 $29.55 63 009-560-030-000 $29.55
29 009-561-012-000 $29.55 64 009-560-031-000 $29.55
30 009-561-013-000 $29.55 65 009-560-032-000 $29.55
31 009-561-014-000 $29.55 66 009-560-033-000 $29.55
32 009-561-015-000 $29.55 67 009-560-034-000 $29.55
33 009-561-016-000 $29.55 68 009-560-035-000 $29.55
34 009-561-017-000 $29.55 69 009-560-036-000 $29.55
35 009-561-018-000 $29.55 70 009-560-037-000 $29.55
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 009-560-038-000 $29.55
72 009-560-039-000 $29.55
73 009-560-040-000 $29.55
74 009-560-041-000 $29.55
75 009-560-042-000 $29.55
76 009-560-043-000 $29.55
77 009-561-034-000 $29.55
78 009-561-035-000 $29.55
79 009-561-036-000 $29.55
80 009-561-037-000 $29.55
81 009-561-038-000 $29.55
82 009-561-039-000 $29.55
83 009-561-040-000 $29.55
84 009-561-041-000 $29.55
85 009-561-042-000 $29.55
86 009-561-043-000 $29.55
87 009-561-044-000 $29.55
88 009-561-045-000 $29.55
89 009-561-046-000 $29.55
90 009-561-047-000 $29.55
91 009-561-048-000 $29.55
92 009-561-049-000 $29.55
93 009-560-044-000 $29.55
94 009-560-045-000 $29.55
95 009-560-046-000 $29.55
96 009-560-047-000 $29.55
97 009-560-048-000 $29.55
98 009-560-049-000 $29.55
99 009-560-050-000 $29.55
100 009-560-051-000 $29.55
TOTAL $2,954.95
1. BEGINNING FUND BALANCE $ 4,668.14
2. LANDSCAPE MAINTENANCE COSTS $ 1,795.19
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 332.05
b. ENGINEERING ADMINISTRATION $ 457.99
c. LEGAL ADMINISTRATION $ 97.73
d. FINANCE ADMINISTRATION $ 67.94
e. TREE TRIMMING $ 473.00
f. GAS & UTILITIES $ 312.62
g. EQUIPMENT g. 125.51
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 20.45
i. MADERA COUNTY PROCESSING FEES $ 139.92
TOTAL COSTS: $ 3,822.42
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 4,912.54
5. TOTAL ASSESSMENT $ 4,066.00
6. AVERAGE ASSESSMENT PER PARCEL 27.10
CITY OF MADERA
ZONE 39
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-470-001-000 $25.57 36 012-470-036-000 $25.57
2 012-470-002-000 $25.57 37 012-470-037-000 $25.57
3 012-470-003-000 $25.57 38 012-470-038-000 $25.57
4 012-470-004-000 $25.57 39 012-470-039-000 $25.57
5 012-470-005-000 $25.57 40 012-470-040-000 $25.57
6 012-470-006-000 $25.57 41 012-470-041-000 $25.57
7 012-470-007-000 $25.57 42 012-470-042-000 $25.57
8 012-470-008-000 $25.57 43 012-470-043-000 $25.57
9 012-470-009-000 $25.57 44 012-470-044-000 $25.57
10 012-470-010-000 $25.57 45 012-470-045-000 $25.57
11 012-470-011-000 $25.57 46 012-470-046-000 $25.57
12 012-470-012-000 $25.57 47 012-470-047-000 $25.57
13 012-470-013-000 $25.57 48 012-470-048-000 $25.57
14 012-470-014-000 $25.57 49 012-470-049-000 $25.57
15 012-470-015-000 $25.57 50 012-470-050-000 $25.57
16 012-470-016-000 $25.57 51 012-470-051-000 $25.57
17 012-470-017-000 $25.57 52 012-470-052-000 $25.57
18 012-470-018-000 $25.57 53 012-470-053-000 $25.57
19 012-470-019-000 $25.57 54 012-470-054-000 $25.57
20 012-470-020-000 $25.57 55 012-470-055-000 $25.57
21 012-470-021-000 $25.57 56 012-470-056-000 $25.57
22 012-470-022-000 $25.57 57 012-470-057-000 $25.57
23 012-470-023-000 $25.57 58 012-470-058-000 $25.57
24 012-470-024-000 $25.57 59 012-470-059-000 $25.57
25 012-470-025-000 $25.57 60 012-470-060-000 $25.57
26 012-470-026-000 $25.57 61 012-470-061-000 $25.57
27 012-470-027-000 $25.57 62 012-470-062-000 $25.57
LANDSCAPE MAINTENANCE DISTRICT
ZONE 39 - CARMEL HOMES III AND VARBELLA
TOTAL ASSESSMENT:
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$4,066.00
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 012-470-028-000 $25.57 63 012-470-063-000 $25.57
29 012-470-029-000 $25.57 64 012-470-064-000 $25.57
30 012-470-030-000 $25.57 65 012-470-065-000 $25.57
31 012-470-031-000 $25.57 66 012-470-066-000 $25.57
32 012-470-032-000 $25.57 67 012-470-067-000 $25.57
33 012-470-033-000 $25.57 68 012-470-068-000 $25.57
34 012-470-034-000 $25.57 69 012-470-069-000 $25.57
35 012-470-035-000 $25.57 70 012-470-070-000 $25.57
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 012-470-071-000 $25.57 116 012-461-034-000 $25.57
72 012-470-072-000 $25.57 117 012-461-035-000 $25.57
73 012-470-073-000 $25.57 118 012-461-036-000 $25.57
74 012-470-074-000 $25.57 119 012-461-037-000 $25.57
75 012-470-075-000 $25.57 120 012-461-038-000 $25.57
76 012-470-076-000 $25.57 121 012-461-039-000 $25.57
77 012-470-077-000 $25.57 122 012-461-040-000 $25.57
78 012-470-078-000 $25.57 123 012-461-041-000 $25.57
79 012-470-079-000 $25.57 124 012-461-042-000 $25.57
80 012-470-080-000 $25.57 125 012-461-043-000 $25.57
81 012-470-081-000 $25.57 126 012-461-044-000 $25.57
82 012-470-082-000 $25.57 127 012-461-045-000 $25.57
83 012-461-001-000 $25.57 128 012-461-046-000 $25.57
84 012-461-002-000 $25.57 129 012-461-047-000 $25.57
85 012-461-003-000 $25.57 130 012-461-048-000 $25.57
86 012-461-004-000 $25.57 131 012-461-049-000 $25.57
87 012-461-005-000 $25.57 132 012-461-050-000 $25.57
88 012-461-006-000 $25.57 133 012-461-051-000 $25.57
89 012-461-007-000 $25.57 134 012-461-052-000 $25.57
90 012-461-008-000 $25.57 135 012-461-053-000 $25.57
91 012-461-009-000 $25.57 136 012-461-054-000 $25.57
92 012-461-083-000 $25.57 137 012-461-055-000 $25.57
93 012-461-084-000 $25.57 138 012-461-056-000 $25.57
94 012-461-012-000 $25.57 139 012-461-057-000 $25.57
95 012-461-013-000 $25.57 140 012-461-058-000 $25.57
96 012-461-014-000 $25.57 141 012-461-059-000 $25.57
97 012-461-015-000 $25.57 142 012-461-060-000 $25.57
98 012-461-016-000 $25.57 143 012-461-061-000 $25.57
99 012-461-017-000 $25.57 144 012-461-062-000 $25.57
100 012-461-018-000 $25.57
101 012-461-019-000 $25.57 146 012-461-064-000 $25.57
102 012-461-020-000 $25.57 147 012-461-065-000 $25.57
103 012-461-021-000 $25.57 148 012-461-066-000 $25.57
104 012-461-022-000 $25.57 149 012-461-067-000 $25.57
105 012-461-023-000 $25.57 150 012-461-068-000 $25.57
106 012-461-024-000 $25.57 151 012-461-069-000 $25.57
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
107 012-461-025-000 $25.57 152 012-461-070-000 $25.57
108 012-461-026-000 $25.57 153 012-461-071-000 $25.57
109 012-461-027-000 $25.57 154 012-461-072-000 $25.57
110 012-461-028-000 $25.57 155 012-461-073-000 $25.57
111 012-461-029-000 $25.57 156 012-461-074-000 $25.57
112 012-461-030-000 $25.57 157 012-461-075-000 $25.57
113 012-461-031-000 $25.57 158 012-461-076-000 $25.57
114 012-461-032-000 $25.57 159 012-461-077-000 $25.57
115 012-461-033-000 $25.57
TOTAL $4,040.42
1. BEGINNING FUND BALANCE $ 5,776.92
2. LANDSCAPE MAINTENANCE COSTS $ 3,705.15
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 306.80
b. ENGINEERING ADMINISTRATION $ 245.39
c. LEGAL ADMINISTRATION $ 52.36
d. FINANCE ADMINISTRATION $ 36.40
e. TREE TRIMMING $ 788.00
f. GAS & UTILITIES $ 216.41
g. EQUIPMENT g. 209.19
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 40.90
i. MADERA COUNTY PROCESSING FEES $ 71.28
TOTAL COSTS: $ 5,671.88
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 5,404.52
5. TOTAL ASSESSMENT $ 5,298.71
6. AVERAGE ASSESSMENT PER PARCEL 65.43
CITY OF MADERA
ZONE 40
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-254-005-000 $67.93 36 012-254-040-000 $67.93
2 012-254-006-000 $67.93 37 012-254-041-000 $67.93
3 012-254-007-000 $67.93 38 012-254-042-000 $67.93
4 012-254-008-000 $67.93 39 012-254-043-000 $67.93
5 012-254-009-000 $67.93 40 012-254-044-000 $67.93
6 012-254-010-000 $67.93 41 012-254-045-000 $67.93
7 012-254-011-000 $67.93 42 012-254-046-000 $67.93
8 012-254-012-000 $67.93 43 012-254-047-000 $67.93
9 012-254-013-000 $67.93 44 012-254-048-000 $67.93
10 012-254-014-000 $67.93 45 012-254-049-000 $67.93
11 012-254-015-000 $67.93 46 012-254-050-000 $67.93
12 012-254-016-000 $67.93 47 012-254-051-000 $67.93
13 012-254-017-000 $67.93 48 012-254-052-000 $67.93
14 012-254-018-000 $67.93 49 012-254-053-000 $67.93
15 012-254-019-000 $67.93 50 012-254-054-000 $67.93
16 012-254-020-000 $67.93 51 012-254-055-000 $67.93
17 012-254-021-000 $67.93 52 012-254-056-000 $67.93
18 012-254-022-000 $67.93 53 012-254-057-000 $67.93
19 012-254-023-000 $67.93 54 012-254-058-000 $67.93
20 012-254-024-000 $67.93 55 012-254-059-000 $67.93
21 012-254-025-000 $67.93 56 012-254-060-000 $67.93
22 012-254-026-000 $67.93 57 012-254-061-000 $67.93
23 012-254-027-000 $67.93 58 012-254-062-000 $67.93
24 012-254-028-000 $67.93 59 012-254-063-000 $67.93
25 012-254-029-000 $67.93 60 012-254-064-000 $67.93
26 012-254-030-000 $67.93 61 012-254-065-000 $67.93
27 012-254-031-000 $67.93 62 012-254-066-000 $67.93
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 40 - TIERRA VISTA ESTATES, Rai Apartments
TOTAL ASSESSMENT:
$5,298.71
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 012-254-032-000 $67.93 63 012-254-067-000 $67.93
29 012-254-033-000 $67.93 64 012-254-068-000 $67.93
30 012-254-034-000 $67.93 65 012-254-069-000 $67.93
31 012-254-035-000 $67.93 66 012-254-070-000 $67.93
32 012-254-036-000 $67.93 67 012-254-071-000 $67.93
33 012-254-037-000 $67.93 68 012-254-072-000 $67.93
34 012-254-038-000 $67.93 69 012-254-073-000 $67.93
35 012-254-039-000 $67.93 70 012-254-074-000 $67.93
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 012-254-075-000 $67.93
72 012-254-076-000 $67.93
73 012-254-077-000 $67.93
74 012-254-078-000 $67.93
75 012-254-079-000 $67.93
76 012-254-080-000 $67.93
77 012-254-081-000 $67.93
78 012-254-082-000 $67.93
79 012-270-002-000 $0.00
80 012-270-001-000 $0.00
81 012-253-002-000 $0.00
Total $5,298.71
1. BEGINNING FUND BALANCE $ 446.47
2. LANDSCAPE MAINTENANCE COSTS $ 4,198.49
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 289.66
b. ENGINEERING ADMINISTRATION $ 103.65
c. LEGAL ADMINISTRATION $ 22.12
d. FINANCE ADMINISTRATION $ 15.38
e. TREE TRIMMING $ 248.00
f. GAS & UTILITIES $ 151.11
g. EQUIPMENT g. 140.35
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 10.23
i. MADERA COUNTY PROCESSING FEES $ 25.52
TOTAL COSTS: $ 5,204.49
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 984.72
5. TOTAL ASSESSMENT $ 5,742.46
6. AVERAGE ASSESSMENT PER PARCEL 198.03
2024-25
CITY OF MADERA
ZONE 41
$5,742.46
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 012-440-001-000 $198.02
2 012-440-002-000 $198.02
3 012-440-003-000 $198.02
4 012-440-004-000 $198.02
5 012-440-005-000 $198.02
6 012-440-006-000 $198.02
7 012-440-007-000 $198.02
8 012-440-008-000 $198.02
9 012-440-009-000 $198.02
10 012-440-010-000 $198.02
11 012-440-011-000 $198.02
12 012-440-012-000 $198.02
13 012-440-013-000 $198.02
14 012-440-014-000 $198.02
15 012-440-015-000 $198.02
16 012-440-016-000 $198.02
17 012-440-017-000 $198.02
18 012-440-018-000 $198.02
19 012-440-019-000 $198.02
20 012-440-020-000 $198.02
21 012-440-021-000 $198.02
22 012-440-022-000 $198.02
23 012-440-023-000 $198.02
24 012-440-024-000 $198.02
25 012-440-025-000 $198.02
26 012-440-026-000 $198.02
27 012-440-027-000 $198.02
28 012-440-028-000 $198.02
TOTAL ASSESSMENT:
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 41 - Pond Place Estates
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
29 012-440-029-000 $198.02
Total $5,742.46
1. BEGINNING FUND BALANCE $ 87,948.03
2. LANDSCAPE MAINTENANCE COSTS $ 54,075.03
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 1,388.07
b. ENGINEERING ADMINISTRATION $ 858.67
c. LEGAL ADMINISTRATION $ 183.23
d. FINANCE ADMINISTRATION $ 127.39
e. TREE TRIMMING $ 2,385.00
f. GAS & UTILITIES $ 4,115.20
g. EQUIPMENT g. 3,188.45
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 562.99
i. MADERA COUNTY PROCESSING FEES $ 269.28
TOTAL COSTS: $ 67,153.30
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 73,759.34
5. TOTAL ASSESSMENT $ 52,964.61
6. AVERAGE ASSESSMENT PER PARCEL 173.09
This zone includes new improvements intended to enhance the neighborhood.
Improvements include:14,540 square feet of landscape and hardscape materials, playground equipment. Inclusion of these improvements do not serve to increase the abase assessment.
CITY OF MADERA
ZONE 43A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-340-004-000 $7,319.22 36 011-341-034-000 $133.08
2 011-340-005-000 $5,190.00 37 011-341-035-000 $133.08
3 011-341-001-000 $133.08 38 011-341-036-000 $133.08
4 011-341-002-000 $133.08 39 011-341-037-000 $133.08
5 011-341-003-000 $133.08 40 011-341-038-000 $133.08
6 011-341-004-000 $133.08 41 011-341-039-000 $133.08
7 011-341-005-000 $133.08 42 011-341-040-000 $133.08
8 011-341-006-000 $133.08 43 011-341-041-000 $133.08
9 011-341-007-000 $133.08 44 011-341-042-000 $133.08
10 011-341-008-000 $133.08 45 011-341-043-000 $133.08
11 011-341-009-000 $133.08 46 011-342-001-000 $133.08
12 011-341-010-000 $133.08 47 011-342-002-000 $133.08
13 011-341-011-000 $133.08 48 011-342-003-000 $133.08
14 011-341-012-000 $133.08 49 011-342-004-000 $133.08
15 011-341-013-000 $133.08 50 011-342-005-000 $133.08
16 011-341-014-000 $133.08 51 011-342-006-000 $133.08
17 011-341-015-000 $133.08 52 011-342-007-000 $133.08
18 011-341-016-000 $133.08 53 011-342-008-000 $133.08
19 011-341-017-000 $133.08 54 011-342-009-000 $133.08
20 011-341-018-000 $133.08 55 011-342-010-000 $133.08
21 011-341-019-000 $133.08 56 011-342-011-000 $133.08
22 011-341-020-000 $133.08 57 011-342-012-000 $133.08
23 011-341-021-000 $133.08 58 011-342-013-000 $133.08
24 011-341-022-000 $133.08 59 011-342-014-000 $133.08
25 011-341-023-000 $133.08 60 011-342-015-000 $133.08
26 011-341-024-000 $133.08 61 011-342-016-000 $133.08
27 011-341-025-000 $133.08 62 011-342-017-000 $133.08
LANDSCAPE MAINTENANCE DISTRICT
ZONE 43A - ORCHARD POINTE PHASE I & II
TOTAL ASSESSMENT:
$52,964.61
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 011-341-026-000 $133.08 63 011-342-018-000 $133.08
29 011-341-027-000 $133.08 64 011-342-019-000 $133.08
30 011-341-028-000 $133.08 65 011-342-020-000 $133.08
31 011-341-029-000 $133.08 66 011-342-021-000 $133.08
32 011-341-030-000 $133.08 67 011-342-022-000 $133.08
33 011-341-031-000 $133.08 68 011-342-023-000 $133.08
34 011-341-032-000 $133.08 69 011-342-024-000 $133.08
35 011-341-033-000 $133.08 70 011-342-025-000 $133.08
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 011-342-026-000 $133.08 116 011-352-011-000 $133.08
72 011-342-027-000 $133.08 117 011-352-012-000 $133.08
73 011-342-028-000 $133.08 118 011-352-013-000 $133.08
74 011-342-029-000 $133.08 119 011-352-014-000 $133.08
75 011-342-030-000 $133.08 120 011-352-015-000 $133.08
76 011-342-031-000 $133.08 121 011-352-016-000 $133.08
77 011-342-032-000 $133.08 122 011-352-017-000 $133.08
78 011-342-033-000 $133.08 123 011-352-018-000 $133.08
79 011-342-034-000 $133.08 124 011-352-019-000 $133.08
80 011-342-035-000 $133.08 125 011-352-020-000 $133.08
81 011-342-036-000 $133.08 126 011-352-021-000 $133.08
82 011-342-037-000 $133.08 127 011-352-022-000 $133.08
83 011-342-038-000 $133.08 128 011-352-023-000 $133.08
84 011-342-039-000 $133.08 129 011-352-024-000 $133.08
85 011-342-040-000 $133.08 130 011-352-025-000 $133.08
86 011-342-041-000 $133.08 131 011-352-026-000 $133.08
87 011-342-042-000 $133.08 132 011-352-027-000 $133.08
88 011-342-043-000 $133.08 133 011-352-028-000 $133.08
89 011-342-044-000 $133.08 134 011-352-029-000 $133.08
90 011-342-045-000 $133.08 135 011-352-030-000 $133.08
91 011-342-046-000 $133.08 136 011-352-031-000 $133.08
92 011-342-047-000 $133.08 137 011-352-032-000 $133.08
93 011-342-048-000 $133.08 138 011-352-033-000 $133.08
94 011-342-049-000 $133.08 139 011-352-034-000 $133.08
95 011-342-050-000 $133.08 140 011-352-035-000 $133.08
96 011-342-051-000 $133.08 141 011-352-036-000 $133.08
97 011-342-052-000 $133.08 142 011-352-037-000 $133.08
98 011-342-053-000 $133.08 143 011-352-038-000 $133.08
99 011-342-054-000 $133.08 144 011-352-039-000 $133.08
100 011-342-055-000 $133.08 145 011-352-040-000 $133.08 101 011-342-056-000 $133.08 146 011-352-041-000 $133.08 102 011-342-057-000 $133.08 147 011-351-001-000 $133.08 103 011-342-058-000 $133.08 148 011-351-002-000 $133.08 104 011-342-059-000 $133.08 149 011-351-003-000 $133.08 105 011-342-060-000 $133.08 150 011-351-004-000 $133.08 106 011-352-001-000 $133.08 151 011-351-005-000 $133.08 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
107 011-352-002-000 $133.08 152 011-351-006-000 $133.08 108 011-352-003-000 $133.08 153 011-351-007-000 $133.08 109 011-352-004-000 $133.08 154 011-351-008-000 $133.08 110 011-352-005-000 $133.08 155 011-351-009-000 $133.08 111 011-352-006-000 $133.08 156 011-351-010-000 $133.08 112 011-352-007-000 $133.08 157 011-351-011-000 $133.08 113 011-352-008-000 $133.08 158 011-351-012-000 $133.08 114 011-352-009-000 $133.08 159 011-351-013-000 $133.08 115 011-352-010-000 $133.08 160 011-351-014-000 $133.08 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
161 011-351-015-000 $133.08 206 011-351-060-000 $133.08 162 011-351-016-000 $133.08 207 011-351-061-000 $133.08 163 011-351-017-000 $133.08 208 011-351-062-000 $133.08 164 011-351-018-000 $133.08 209 011-351-063-000 $133.08 165 011-351-019-000 $133.08 210 011-351-064-000 $133.08 166 011-351-020-000 $133.08 211 011-351-065-000 $133.08 167 011-351-021-000 $133.08 212 011-351-066-000 $133.08 168 011-351-022-000 $133.08 213 011-351-067-000 $133.08 169 011-351-023-000 $133.08 214 011-351-068-000 $133.08 170 011-351-024-000 $133.08 215 011-351-069-000 $133.08 171 011-351-025-000 $133.08 216 011-351-070-000 $133.08 172 011-351-026-000 $133.08 217 011-351-071-000 $133.08 173 011-351-027-000 $133.08 218 011-351-072-000 $133.08 174 011-351-028-000 $133.08 219 011-351-073-000 $133.08 175 011-351-029-000 $133.08 220 011-351-074-000 $133.08 176 011-351-030-000 $133.08 221 011-351-075-000 $133.08 177 011-351-031-000 $133.08 222 011-351-076-000 $133.08 178 011-351-032-000 $133.08 223 011-351-077-000 $133.08 179 011-351-033-000 $133.08 224 011-351-078-000 $133.08 180 011-351-034-000 $133.08 225 011-351-079-000 $133.08 181 011-351-035-000 $133.08 226 011-351-080-000 $133.08 182 011-351-036-000 $133.08 227 011-350-001-000 $133.08 183 011-351-037-000 $133.08 228 011-350-002-000 $133.08 184 011-351-038-000 $133.08 229 011-350-003-000 $133.08 185 011-351-039-000 $133.08 230 011-350-004-000 $133.08 186 011-351-040-000 $133.08 231 011-350-005-000 $133.08 187 011-351-041-000 $133.08 232 011-350-006-000 $133.08 188 011-351-042-000 $133.08 233 011-350-007-000 $133.08 189 011-351-043-000 $133.08 234 011-350-008-000 $133.08 190 011-351-044-000 $133.08 235 011-350-009-000 $133.08 191 011-351-045-000 $133.08 236 011-350-010-000 $133.08 192 011-351-046-000 $133.08 237 011-350-011-000 $133.08 193 011-351-047-000 $133.08 238 011-350-012-000 $133.08 194 011-351-048-000 $133.08 239 011-350-013-000 $133.08 195 011-351-049-000 $133.08 240 011-350-014-000 $133.08 196 011-351-050-000 $133.08 241 011-350-015-000 $133.08 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
197 011-351-051-000 $133.08 242 011-350-016-000 $133.08 198 011-351-052-000 $133.08 243 011-350-017-000 $133.08 199 011-351-053-000 $133.08 244 011-350-018-000 $133.08 200 011-351-054-000 $133.08 245 011-350-019-000 $133.08 201 011-351-055-000 $133.08 * 246 011-350-020-000 $133.08 202 011-351-056-000 $133.08 * 247 011-350-021-000 $133.08 203 011-351-057-000 $133.08 * 248 011-350-022-000 $133.08 204 011-351-085-000 $133.08 * 249 011-350-023-000 $133.08 205 011-351-086-000 $133.08 250 011-350-024-000 $133.08 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
251 011-350-025-000 $133.08 296 011-353-006-000 $133.08 252 011-350-026-000 $133.08 297 011-353-007-000 $133.08 253 011-350-027-000 $133.08 298 011-353-008-000 $133.08 254 011-350-028-000 $133.08 299 011-353-009-000 $133.08 255 011-350-029-000 $133.08 300 011-353-010-000 $133.08 256 011-350-030-000 $133.08 301 011-353-011-000 $133.08 257 011-350-031-000 $133.08 302 011-353-012-000 $133.08 258 011-350-032-000 $133.08 303 011-353-013-000 $133.08 259 011-350-033-000 $133.08 304 011-353-014-000 $133.08 260 011-350-034-000 $133.08 305 011-353-015-000 $133.08 261 011-350-035-000 $133.08 306 011-353-016-000 $133.08 262 011-350-036-000 $133.08
263 011-350-037-000 $133.08
264 011-350-038-000 $133.08
265 011-350-039-000 $133.08 TO COUNTY: $52,432.29
DIRECT BILL: $532.31
266 011-350-040-000 $133.08 TOTAL: $52,964.60
267 011-350-041-000 $133.08
268 011-350-042-000 $133.08
269 011-350-043-000 $133.08
270 011-350-044-000 $133.08
271 011-350-045-000 $133.08
272 011-350-046-000 $133.08
273 011-350-047-000 $133.08
274 011-350-048-000 $133.08
275 011-350-049-000 $133.08
276 011-350-050-000 $133.08
277 011-350-051-000 $133.08
278 011-350-052-000 $133.08
279 011-350-053-000 $133.08
280 011-350-054-000 $133.08
281 011-350-055-000 $133.08
282 011-350-056-000 $133.08
283 011-350-057-000 $133.08
284 011-350-058-000 $133.08
285 011-350-059-000 $133.08
286 011-350-060-000 $133.08
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
287 011-350-061-000 $133.08
288 011-350-062-000 $133.08
289 011-350-063-000 $133.08
290 011-350-068-000 $133.08
291 011-353-001-000 $133.08
292 011-353-002-000 $133.08
293 011-353-003-000 $133.08
294 011-353-004-000 $133.08
295 011-353-005-000 $133.08
1. BEGINNING FUND BALANCE $ 27,948.83
2. LANDSCAPE MAINTENANCE COSTS $ 19,788.23
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 520.97
b. ENGINEERING ADMINISTRATION $ 586.10
c. LEGAL ADMINISTRATION $ 125.07
d. FINANCE ADMINISTRATION $ 86.95
e. TREE TRIMMING $ 3,690.00
f. GAS & UTILITIES $ 1,032.37
g. EQUIPMENT g. 1,117.08
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 215.54
i. MADERA COUNTY PROCESSING FEES $ 181.28
TOTAL COSTS: $ 27,343.57
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 26,041.93
5. TOTAL ASSESSMENT $ 25,436.68
6. AVERAGE ASSESSMENT PER PARCEL 123.48
2024-25
CITY OF MADERA
ZONE 43C
$25,436.68
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-331-001-000 $123.48 36 011-333-033-000 $123.48
2 011-331-002-000 $123.48 37 011-333-034-000 $123.48
3 011-331-003-000 $123.48 38 011-333-035-000 $123.48
4 011-333-001-000 $123.48 39 011-333-036-000 $123.48
5 011-333-002-000 $123.48 40 011-333-037-000 $123.48
6 011-333-003-000 $123.48 41 011-333-038-000 $123.48
7 011-333-004-000 $123.48 42 011-333-039-000 $123.48
8 011-333-005-000 $123.48 43 011-333-040-000 $123.48
9 011-333-006-000 $123.48 44 011-333-041-000 $123.48
10 011-333-007-000 $123.48 45 011-333-042-000 $123.48
11 011-333-008-000 $123.48 46 011-333-043-000 $123.48
12 011-333-009-000 $123.48 47 011-333-044-000 $123.48
13 011-333-010-000 $123.48 48 011-331-019-000 $123.48
14 011-333-011-000 $123.48 49 011-331-020-000 $123.48
15 011-333-012-000 $123.48 50 011-331-021-000 $123.48
16 011-333-013-000 $123.48 51 011-332-001-000 $123.48
17 011-333-014-000 $123.48 52 011-332-002-000 $123.48
18 011-333-015-000 $123.48 53 011-332-003-000 $123.48
19 011-333-016-000 $123.48 54 011-332-004-000 $123.48
20 011-333-017-000 $123.48 55 011-332-005-000 $123.48
21 011-333-018-000 $123.48 56 011-332-006-000 $123.48
22 011-333-019-000 $123.48 57 011-332-007-000 $123.48
23 011-333-020-000 $123.48 58 011-332-008-000 $123.48
24 011-333-021-000 $123.48 59 011-332-009-000 $123.48
25 011-333-022-000 $123.48 60 011-332-010-000 $123.48
26 011-333-023-000 $123.48 61 011-332-011-000 $123.48
27 011-333-024-000 $123.48 62 011-332-012-000 $123.48
TOTAL ASSESSMENT:
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 43C - El Coronado Estates
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 011-333-025-000 $123.48 63 011-332-013-000 $123.48
29 011-333-026-000 $123.48 64 011-332-014-000 $123.48
30 011-333-027-000 $123.48 65 011-332-015-000 $123.48
31 011-333-028-000 $123.48 66 011-332-016-000 $123.48
32 011-333-029-000 $123.48 67 011-332-017-000 $123.48
33 011-333-030-000 $123.48 68 011-332-018-000 $123.48
34 011-333-031-000 $123.48 69 011-332-019-000 $123.48
35 011-333-032-000 $123.48 70 011-332-020-000 $123.48
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 011-332-021-000 $123.48 116 011-333-082-000 $123.48
72 011-332-022-000 $123.48 117 011-333-083-000 $123.48
73 011-332-023-000 $123.48 118 011-333-084-000 $123.48
74 011-332-024-000 $123.48 119 011-333-085-000 $123.48
75 011-332-025-000 $123.48 120 011-331-004-000 $123.48
76 011-332-026-000 $123.48 121 011-331-005-000 $123.48
77 011-332-027-000 $123.48 122 011-331-006-000 $123.48
78 011-332-028-000 $123.48 123 011-331-007-000 $123.48
79 011-333-045-000 $123.48 124 011-331-008-000 $123.48
80 011-333-046-000 $123.48 125 011-331-009-000 $123.48
81 011-333-047-000 $123.48 126 011-331-010-000 $123.48
82 011-333-048-000 $123.48 127 011-331-011-000 $123.48
83 011-333-049-000 $123.48 128 011-331-012-000 $123.48
84 011-333-050-000 $123.48 129 011-331-013-000 $123.48
85 011-333-051-000 $123.48 130 011-331-014-000 $123.48
86 011-333-052-000 $123.48 131 011-331-015-000 $123.48
87 011-333-053-000 $123.48 132 011-331-016-000 $123.48
88 011-333-054-000 $123.48 133 011-331-017-000 $123.48
89 011-333-055-000 $123.48 134 011-331-018-000 $123.48
90 011-333-056-000 $123.48 135 011-333-086-000 $123.48
91 011-333-057-000 $123.48 136 011-333-087-000 $123.48
92 011-333-058-000 $123.48 137 011-333-088-000 $123.48
93 011-333-059-000 $123.48 138 011-333-089-000 $123.48
94 011-333-060-000 $123.48 139 011-333-090-000 $123.48
95 011-333-061-000 $123.48 140 011-333-091-000 $123.48
96 011-333-062-000 $123.48 141 011-333-092-000 $123.48
97 011-333-063-000 $123.48 142 011-333-093-000 $123.48
98 011-333-064-000 $123.48 143 011-333-094-000 $123.48
99 011-333-065-000 $123.48 144 011-333-095-000 $123.48
100 011-333-066-000 $123.48 145 011-333-096-000 $123.48 101 011-333-067-000 $123.48 146 011-333-097-000 $123.48 102 011-333-068-000 $123.48 147 011-331-022-000 $123.48 103 011-333-069-000 $123.48 148 011-331-023-000 $123.48 104 011-333-070-000 $123.48 149 011-331-024-000 $123.48 105 011-333-071-000 $123.48 150 011-331-025-000 $123.48 106 011-333-072-000 $123.48 151 011-331-026-000 $123.48 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
107 011-333-073-000 $123.48 152 011-331-027-000 $123.48 108 011-333-074-000 $123.48 153 011-331-028-000 $123.48 109 011-333-075-000 $123.48 154 011-331-029-000 $123.48 110 011-333-076-000 $123.48 155 011-331-030-000 $123.48 111 011-333-077-000 $123.48 156 011-331-031-000 $123.48 112 011-333-078-000 $123.48 157 011-331-032-000 $123.48 113 011-333-079-000 $123.48 158 011-331-033-000 $123.48 114 011-333-080-000 $123.48 159 011-331-034-000 $123.48 115 011-333-081-000 $123.48 160 011-331-035-000 $123.48 Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
161 011-331-036-000 $123.48 206 011-332-058-000 $123.48 162 011-331-037-000 $123.48
163 011-331-038-000 $123.48 Total $25,436.68
164 011-331-039-000 $123.48
165 011-331-040-000 $123.48
166 011-331-041-000 $123.48
167 011-331-042-000 $123.48
168 011-331-043-000 $123.48
169 011-331-044-000 $123.48
170 011-331-045-000 $123.48
171 011-331-046-000 $123.48
172 011-331-047-000 $123.48
173 011-331-048-000 $123.48
174 011-331-049-000 $123.48
175 011-331-050-000 $123.48
176 011-331-051-000 $123.48
177 011-332-029-000 $123.48
178 011-332-030-000 $123.48
179 011-332-031-000 $123.48
180 011-332-032-000 $123.48
181 011-332-033-000 $123.48
182 011-332-034-000 $123.48
183 011-332-035-000 $123.48
184 011-332-036-000 $123.48
185 011-332-037-000 $123.48
186 011-332-038-000 $123.48
187 011-332-039-000 $123.48
188 011-332-040-000 $123.48
189 011-332-041-000 $123.48
190 011-332-042-000 $123.48
191 011-332-043-000 $123.48
192 011-332-044-000 $123.48
193 011-332-045-000 $123.48
194 011-332-046-000 $123.48
195 011-332-047-000 $123.48
196 011-332-048-000 $123.48
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
197 011-332-049-000 $123.48
198 011-332-050-000 $123.48
199 011-332-051-000 $123.48
200 011-332-052-000 $123.48
201 011-332-053-000 $123.48
202 011-332-054-000 $123.48
203 011-332-055-000 $123.48
204 011-332-056-000 $123.48
205 011-332-057-000 $123.48
1. BEGINNING FUND BALANCE $ 8,078.47
2. LANDSCAPE MAINTENANCE COSTS $ 6,637.76
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 354.09
b. ENGINEERING ADMINISTRATION $ 308.08
c. LEGAL ADMINISTRATION $ 65.74
d. FINANCE ADMINISTRATION $ 45.70
e. TREE TRIMMING $ 1,395.00
f. GAS & UTILITIES $ 396.56
g. EQUIPMENT g. 374.74
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 73.68
i. MADERA COUNTY PROCESSING FEES $ 91.52
TOTAL COSTS: $ 9,742.86
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 6,417.09
5. TOTAL ASSESSMENT $ 8,081.48
6. AVERAGE ASSESSMENT PER PARCEL 77.71
2024-25
CITY OF MADERA
ZONE 43D
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-360-001-000 77.71 36 011-360-036-000 77.71
2 011-360-002-000 77.71 37 011-360-037-000 77.71
3 011-360-003-000 77.71 38 011-360-038-000 77.71
4 011-360-004-000 77.71 39 011-360-039-000 77.71
5 011-360-005-000 77.71 40 011-360-040-000 77.71
6 011-360-006-000 77.71 41 011-360-041-000 77.71
7 011-360-007-000 77.71 42 011-360-042-000 77.71
8 011-360-008-000 77.71 43 011-360-043-000 77.71
9 011-360-009-000 77.71 44 011-360-044-000 77.71
10 011-360-010-000 77.71 45 011-360-045-000 77.71
11 011-360-011-000 77.71 46 011-360-046-000 77.71
12 011-360-012-000 77.71 47 011-360-047-000 77.71
13 011-360-013-000 77.71 48 011-360-048-000 77.71
14 011-360-014-000 77.71 49 011-360-049-000 77.71
15 011-360-015-000 77.71 50 011-360-050-000 77.71
16 011-360-016-000 77.71 51 011-360-051-000 77.71
17 011-360-017-000 77.71 52 011-360-052-000 77.71
18 011-360-018-000 77.71 53 011-360-053-000 77.71
19 011-360-019-000 77.71 54 011-360-054-000 77.71
20 011-360-020-000 77.71 55 011-360-055-000 77.71
21 011-360-021-000 77.71 56 011-360-056-000 77.71
22 011-360-022-000 77.71 57 011-360-057-000 77.71
23 011-360-023-000 77.71 58 011-360-058-000 77.71
24 011-360-024-000 77.71 59 011-360-059-000 77.71
25 011-360-025-000 77.71 60 011-361-001-000 77.71
26 011-360-026-000 77.71 61 011-361-002-000 77.71
27 011-360-027-000 77.71 62 011-361-003-000 77.71
$8,081.48
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 43D - ALMOND VILLAGE ESTATES
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 011-360-028-000 77.71 63 011-361-004-000 77.71
29 011-360-029-000 77.71 64 011-361-005-000 77.71
30 011-360-030-000 77.71 65 011-361-006-000 77.71
31 011-360-031-000 77.71 66 011-361-007-000 77.71
32 011-360-032-000 77.71 67 011-361-008-000 77.71
33 011-360-033-000 77.71 68 011-361-009-000 77.71
34 011-360-034-000 77.71 69 011-361-010-000 77.71
35 011-360-035-000 77.71 70 011-361-011-000 77.71
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 011-361-012-000 77.71
72 011-361-013-000 77.71
73 011-361-014-000 77.71
74 011-361-015-000 77.71
75 011-361-016-000 77.71
76 011-361-017-000 77.71
77 011-361-018-000 77.71
78 011-361-019-000 77.71
79 011-361-020-000 77.71
80 011-361-021-000 77.71
81 011-361-022-000 77.71
82 011-361-023-000 77.71
83 011-361-024-000 77.71
84 011-361-025-000 77.71
85 011-361-026-000 77.71
86 011-361-027-000 77.71
87 011-361-028-000 77.71
88 011-361-029-000 77.71
89 011-361-030-000 77.71
90 011-361-031-000 77.71
91 011-361-032-000 77.71
92 011-361-033-000 77.71
93 011-361-034-000 77.71
94 011-361-035-000 77.71
95 011-361-036-000 77.71
96 011-361-037-000 77.71
97 011-360-060-000 77.71
98 011-360-061-000 77.71
99 011-360-062-000 77.71
100 011-360-063-000 77.71
101 011-360-064-000 77.71
102 011-360-065-000 77.71
103 011-360-066-000 77.71
104 011-360-067-000 77.71
Total 8081.48
1. BEGINNING FUND BALANCE $ 7,856.28
2. LANDSCAPE MAINTENANCE COSTS $ 736.99
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 264.00
b. ENGINEERING ADMINISTRATION $ 79.12
c. LEGAL ADMINISTRATION $ 16.88
d. FINANCE ADMINISTRATION $ 11.74
e. TREE TRIMMING $ 0.00
f. GAS & UTILITIES $ 53.35
g. EQUIPMENT g. 89.96
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 30.68
i. MADERA COUNTY PROCESSING FEES $ 17.60
TOTAL COSTS: $ 1,300.31
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 6,555.97
5. TOTAL ASSESSMENT $ 0.00
6. AVERAGE ASSESSMENT PER PARCEL 0.00
CITY OF MADERA
ZONE 43E
2024-25
$0.00
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 011-301-001-000 $0.00
2 011-301-002-000 $0.00
3 011-301-003-000 $0.00
4 011-301-004-000 $0.00
5 011-301-005-000 $0.00
6 011-301-006-000 $0.00
7 011-301-007-000 $0.00
8 011-301-008-000 $0.00
9 011-301-009-000 $0.00
10 011-301-010-000 $0.00
11 011-301-011-000 $0.00
12 011-301-012-000 $0.00
13 011-301-013-000 $0.00
14 011-301-014-000 $0.00
15 011-301-015-000 $0.00
16 011-301-016-000 $0.00
17 011-301-017-000 $0.00
18 011-301-018-000 $0.00
19 011-301-019-000 $0.00
20 011-301-020-000 $0.00
Total $0.00
TOTAL ASSESSMENT:
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 43E - Taylor Estates Subdivision
1. BEGINNING FUND BALANCE $ 1,188.67
2. LANDSCAPE MAINTENANCE COSTS $ 4,690.11
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 284.61
b. ENGINEERING ADMINISTRATION $ 60.04
c. LEGAL ADMINISTRATION $ 12.81
d. FINANCE ADMINISTRATION $ 8.91
e. TREE TRIMMING $ 0.00
f. GAS & UTILITIES $ 131.84
g. EQUIPMENT g. 129.39
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 30.68
i. MADERA COUNTY PROCESSING FEES $ 11.44
TOTAL COSTS: $ 5,359.82
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 351.78
5. TOTAL ASSESSMENT $ 4,522.80
6. AVERAGE ASSESSMENT PER PARCEL 347.92
CITY OF MADERA
ZONE 44
2024-25
Assessment Assessor’s Parcel
Number Number Assessment
1 011-202-022-000 $347.91
2 011-202-023-000 $347.91
3 011-202-024-000 $347.91
4 011-202-025-000 $347.91
5 011-202-026-000 $347.91
6 011-202-027-000 $347.91
7 011-202-028-000 $347.91
8 011-202-029-000 $347.91
9 011-202-030-000 $347.91
10 011-202-016-000 $347.91
11 011-202-017-000 $347.91
12 011-202-018-000 $347.91
13 011-202-019-000 $347.91
TOTAL $4,522.80
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$4,522.80
LANDSCAPE MAINTENANCE DISTRICT
ZONE 44 - SIERRA VISTA ESTATES PHASE III
TOTAL ASSESSMENT:
1. BEGINNING FUND BALANCE $ 7,649.57
2. LANDSCAPE MAINTENANCE COSTS $ 7,043.73
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 358.22
b. ENGINEERING ADMINISTRATION $ 308.08
c. LEGAL ADMINISTRATION $ 65.74
d. FINANCE ADMINISTRATION $ 45.70
e. TREE TRIMMING $ 743.00
f. GAS & UTILITIES $ 412.31
g. EQUIPMENT g. 397.62
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 15.34
i. MADERA COUNTY PROCESSING FEES $ 91.52
TOTAL COSTS: $ 9,481.26
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 5,571.11
5. TOTAL ASSESSMENT $ 7,402.80
6. AVERAGE ASSESSMENT PER PARCEL 71.18
CITY OF MADERA
ZONE 45A
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-131-001-000 $71.18 36 008-132-006-000 $71.18
2 008-131-002-000 $71.18 37 008-132-007-000 $71.18
3 008-131-003-000 $71.18 38 008-132-008-000 $71.18
4 008-131-004-000 $71.18 39 008-132-009-000 $71.18
5 008-131-005-000 $71.18 40 008-132-010-000 $71.18
6 008-131-006-000 $71.18 41 008-132-011-000 $71.18
7 008-131-007-000 $71.18 42 008-132-012-000 $71.18
8 008-131-008-000 $71.18 43 008-132-013-000 $71.18
9 008-131-009-000 $71.18 44 008-132-014-000 $71.18
10 008-131-010-000 $71.18 45 008-132-015-000 $71.18
11 008-131-011-000 $71.18 46 008-132-016-000 $71.18
12 008-131-012-000 $71.18 47 008-132-017-000 $71.18
13 008-131-013-000 $71.18 48 008-132-018-000 $71.18
14 008-131-014-000 $71.18 49 008-132-019-000 $71.18
15 008-131-015-000 $71.18 50 008-132-020-000 $71.18
16 008-131-016-000 $71.18 51 008-132-021-000 $71.18
17 008-131-017-000 $71.18 52 008-132-022-000 $71.18
18 008-131-018-000 $71.18 53 008-132-023-000 $71.18
19 008-131-019-000 $71.18 54 008-132-024-000 $71.18
20 008-131-020-000 $71.18 55 008-132-025-000 $71.18
21 008-131-021-000 $71.18 56 008-132-026-000 $71.18
22 008-131-022-000 $71.18 57 008-132-027-000 $71.18
23 008-131-023-000 $71.18 58 008-132-028-000 $71.18
24 008-131-024-000 $71.18 59 008-132-029-000 $71.18
25 008-131-025-000 $71.18 60 008-132-030-000 $71.18
26 008-131-026-000 $71.18 61 008-132-031-000 $71.18
27 008-131-027-000 $71.18 62 008-132-032-000 $71.18
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$7,402.80
LANDSCAPE MAINTENANCE DISTRICT
ZONE 45A - SIENNA ESTATES I & II
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 008-131-028-000 $71.18 63 008-132-033-000 $71.18
29 008-131-029-000 $71.18 64 008-132-034-000 $71.18
30 008-131-030-000 $71.18 65 008-132-035-000 $71.18
31 008-132-001-000 $71.18 66 008-132-036-000 $71.18
32 008-132-002-000 $71.18 67 008-132-037-000 $71.18
33 008-132-003-000 $71.18 68 008-132-038-000 $71.18
34 008-132-004-000 $71.18 69 008-132-039-000 $71.18
35 008-132-005-000 $71.18 70 008-131-031-000 $71.18
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 008-131-032-000 $71.18
72 008-131-033-000 $71.18
73 008-131-034-000 $71.18
74 008-131-035-000 $71.18
75 008-131-036-000 $71.18
76 008-131-037-000 $71.18
77 008-131-038-000 $71.18
78 008-131-039-000 $71.18
79 008-131-040-000 $71.18
80 008-131-041-000 $71.18
81 008-131-042-000 $71.18
82 008-131-043-000 $71.18
83 008-131-044-000 $71.18
84 008-131-045-000 $71.18
85 008-131-046-000 $71.18
86 008-131-047-000 $71.18
87 008-131-048-000 $71.18
88 008-131-049-000 $71.18
89 008-131-050-000 $71.18
90 008-131-051-000 $71.18
91 008-131-052-000 $71.18
92 008-131-053-000 $71.18
93 008-131-054-000 $71.18
94 008-131-055-000 $71.18
95 008-131-056-000 $71.18
96 008-131-057-000 $71.18
97 008-132-040-000 $71.18
98 008-132-041-000 $71.18
99 008-132-042-000 $71.18
100 008-132-043-000 $71.18
101 008-132-044-000 $71.18
102 008-132-045-000 $71.18
103 008-132-046-000 $71.18
104 008-132-047-000 $71.18
Total $7,402.80
1. BEGINNING FUND BALANCE $ 8,668.01
2. LANDSCAPE MAINTENANCE COSTS $ 9,815.32
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 391.76
b. ENGINEERING ADMINISTRATION $ 302.63
c. LEGAL ADMINISTRATION $ 64.58
d. FINANCE ADMINISTRATION $ 44.90
e. TREE TRIMMING $ 795.00
f. GAS & UTILITIES $ 540.11
g. EQUIPMENT g. 283.37
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 20.45
i. MADERA COUNTY PROCESSING FEES $ 89.76
TOTAL COSTS: $ 12,347.87
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 8,532.98
5. TOTAL ASSESSMENT $ 12,212.83
6. AVERAGE ASSESSMENT PER PARCEL 119.73
CITY OF MADERA
2024-25
ZONE 46
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 009-580-001-000 $119.73 36 009-580-037-000 $119.73
2 009-580-002-000 $119.73 37 009-580-038-000 $119.73
3 009-580-003-000 $119.73 38 009-580-039-000 $119.73
4 009-580-004-000 $119.73 39 009-580-040-000 $119.73
5 009-580-005-000 $119.73 40 009-580-041-000 $119.73
6 009-580-006-000 $119.73 41 009-580-042-000 $119.73
7 009-580-007-000 $119.73 42 009-580-043-000 $119.73
8 009-580-008-000 $119.73 43 009-580-044-000 $119.73
9 009-580-009-000 $119.73 44 009-580-045-000 $119.73
10 009-580-010-000 $119.73 45 009-580-046-000 $119.73
11 009-580-011-000 $119.73 46 009-580-047-000 $119.73
12 009-580-012-000 $119.73 47 009-580-048-000 $119.73
13 009-580-013-000 $119.73 48 009-580-049-000 $119.73
14 009-580-055-000 $119.73 49 009-580-050-000 $119.73
15 009-580-056-000 $119.73 50 009-580-051-000 $119.73
16 009-580-057-000 $119.73 51 009-580-052-000 $119.73
17 009-580-058-000 $119.73 52 009-581-060-000 $119.73
18 009-580-059-000 $119.73 53 009-581-002-000 $119.73
19 009-580-060-000 $119.73 54 009-581-003-000 $119.73
20 009-580-021-000 $119.73 55 009-581-004-000 $119.73
21 009-580-022-000 $119.73 56 009-581-005-000 $119.73
22 009-580-023-000 $119.73 57 009-581-006-000 $119.73
23 009-580-024-000 $119.73 58 009-581-007-000 $119.73
24 009-580-025-000 $119.73 59 009-581-008-000 $119.73
25 009-580-026-000 $119.73 60 009-581-009-000 $119.73
26 009-580-027-000 $119.73 61 009-581-010-000 $119.73
27 009-580-028-000 $119.73 62 009-581-011-000 $119.73
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
$12,212.83
LANDSCAPE MAINTENANCE DISTRICT
ZONE 46 - CAPISTRANO XVII
TOTAL ASSESSMENT:
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
28 009-580-029-000 $119.73 63 009-581-012-000 $119.73
29 009-580-030-000 $119.73 64 009-581-013-000 $119.73
30 009-580-031-000 $119.73 65 009-581-014-000 $119.73
31 009-580-032-000 $119.73 66 009-581-015-000 $119.73
32 009-580-033-000 $119.73 67 009-581-016-000 $119.73
33 009-580-034-000 $119.73 68 009-581-017-000 $119.73
34 009-580-035-000 $119.73 69 009-581-018-000 $119.73
35 009-580-036-000 $119.73 70 009-581-019-000 $119.73
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
71 009-581-020-000 $119.73
72 009-581-021-000 $119.73
73 009-581-022-000 $119.73
74 009-581-023-000 $119.73
75 009-581-024-000 $119.73
76 009-581-025-000 $119.73
77 009-581-026-000 $119.73
78 009-581-027-000 $119.73
79 009-581-028-000 $119.73
80 009-581-029-000 $119.73
81 009-581-030-000 $119.73
82 009-581-031-000 $119.73
83 009-581-032-000 $119.73
84 009-581-033-000 $119.73
85 009-581-034-000 $119.73
86 009-581-041-000 $119.73
87 009-581-042-000 $119.73
88 009-581-043-000 $119.73
89 009-581-044-000 $119.73
90 009-581-045-000 $119.73
91 009-581-046-000 $119.73
92 009-581-047-000 $119.73
93 009-581-048-000 $119.73
94 009-581-049-000 $119.73
95 009-581-050-000 $119.73
96 009-581-051-000 $119.73
97 009-581-052-000 $119.73
98 009-581-053-000 $119.73
99 009-581-054-000 $119.73
100 009-581-055-000 $119.73
101 009-581-056-000 $119.73
102 009-581-057-000 $119.73
Total $12,212.83
1. BEGINNING FUND BALANCE $ 41.47
2. LANDSCAPE MAINTENANCE COSTS $ 2,065.84
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 259.90
b. ENGINEERING ADMINISTRATION $ 92.75
c. LEGAL ADMINISTRATION $ 19.79
d. FINANCE ADMINISTRATION $ 13.76
e. TREE TRIMMING $ 90.00
f. GAS & UTILITIES $ 43.05
g. EQUIPMENT g. 34.46
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 15.34
i. MADERA COUNTY PROCESSING FEES $ 22.00
TOTAL COSTS: $ 2,656.88
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 350.74
5. TOTAL ASSESSMENT $ 2,966.15
6. AVERAGE ASSESSMENT PER PARCEL 118.65
CITY OF MADERA
ZONE 50
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 008-142-042-000 $118.65
2 008-142-043-000 $118.65
3 008-142-044-000 $118.65
4 008-142-045-000 $118.65
5 008-142-046-000 $118.65
6 008-142-047-000 $118.65
7 008-142-048-000 $118.65
8 008-142-049-000 $118.65
9 008-142-050-000 $118.65
10 008-142-051-000 $118.65
11 008-142-052-000 $118.65
12 008-142-053-000 $118.65
13 008-142-054-000 $118.65
14 008-142-055-000 $118.65
15 008-142-056-000 $118.65
16 008-142-057-000 $118.65
17 008-142-058-000 $118.65
18 008-142-059-000 $118.65
19 008-142-060-000 $118.65
20 008-142-061-000 $118.65
21 008-142-062-000 $118.65
22 008-142-063-000 $118.65
23 008-142-064-000 $118.65
24 008-142-065-000 $118.65
25 008-142-066-000 $118.65
TOTAL: $2,966.15
TOTAL ASSESSMENT:
$2,966.15
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 50 - SUGARPINE
1. BEGINNING FUND BALANCE $ 6,792.58
2. LANDSCAPE MAINTENANCE COSTS $ 7,369.20
3. INCIDENTAL COSTS:
a. PARKS ADMINISTRATION $ 730.92
b. ENGINEERING ADMINISTRATION $ 531.58
c. LEGAL ADMINISTRATION $ 113.43
d. FINANCE ADMINISTRATION $ 78.86
e. TREE TRIMMING $ 270.00
f. GAS & UTILITIES $ 716.07
g. EQUIPMENT g. 437.58
h. FUEL, SUPPLIES, MAINTENANCE MATERIALS $ 20.45
i. MADERA COUNTY PROCESSING FEES $ 163.68
TOTAL COSTS: $ 10,431.77
4. ESTIMATED CASH FLOW RESERVE AND ENDING FUND BALANCE 7,384.25
5. TOTAL ASSESSMENT $ 11,023.45
6. AVERAGE ASSESSMENT PER PARCEL 59.27
CITY OF MADERA
ZONE 51
2024-25
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
1 003-260-051-000 $49.61 34 009-610-014-000 $7.40
2 003-260-052-000 $46.20 35 009-610-015-000 $7.40
3 009-331-004-000 $240.82 36 009-610-016-000 $7.40
4 009-331-005-000 $233.17 37 009-610-017-000 $7.40
5 009-331-006-000 $243.19 38 009-610-018-000 $7.40
0 009-331-007-000 $248.19 39 009-610-019-000 $7.40
6 009-331-008-000 $0.00 40 009-610-020-000 $7.40
0 009-331-009-000 $0.00 41 009-610-021-000 $7.40
7 009-331-012-000 $286.63 42 009-610-022-000 $7.40
8 009-331-013-000 $279.25 43 009-610-023-000 $7.40
9 009-331-014-000 $372.05 44 009-610-024-000 $7.40
10 009-331-015-000 $383.85 45 009-610-025-000 $7.40
11 009-331-016-000 $464.03 46 009-610-026-000 $7.40
12 009-331-023-000 $526.39 47 009-610-027-000 $7.40
13 009-331-024-000 $1,316.76 48 009-610-028-000 $7.40
14 009-331-025-000 $285.13 49 009-610-029-000 $7.40
15 009-331-011-000 $211.68 50 009-610-030-000 $7.40
16 009-331-010-000 $206.84 51 009-610-031-000 $7.40
17 009-331-018-000 $221.82 52 009-610-032-000 $7.40
18 009-331-019-000 $221.76 53 009-610-033-000 $7.40
19 003-250-025-000 $168.93 54 009-610-034-000 $7.40
20 003-210-035-000 $316.51 55 009-610-035-000 $7.40
21 009-610-001-000 $7.40 56 009-610-036-000 $7.40
22 009-610-002-000 $7.40 57 009-610-037-000 $7.40
23 009-610-003-000 $7.40 58 009-610-038-000 $7.40
24 009-610-004-000 $7.40 59 009-610-039-000 $7.40
25 009-610-005-000 $7.40 60 009-610-040-000 $7.40
26 009-610-006-000 $7.40 61 009-610-041-000 $7.40
27 009-610-007-000 $7.40 62 009-610-042-000 $7.40
28 009-610-008-000 $7.40 63 009-610-043-000 $7.40
29 009-610-009-000 $7.40 64 009-610-044-000 $7.40
30 009-610-010-000 $7.40 65 009-610-045-000 $7.40
31 009-610-011-000 $7.40 66 009-610-046-000 $7.40
32 009-610-012-000 $7.40 67 009-610-047-000 $7.40
33 009-610-013-000 $7.40 68 009-611-001-000 $7.40
TOTAL ASSESSMENT:
$11,023.45
ASSESSMENT ROLL
2024-25 ASSESSMENT ROLL
FOR
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
ZONE 51 - RED ROCK RETAIL CENTER, ET AL
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
69 009-611-002-000 $7.40 114 009-610-078-000 $7.40
70 009-611-003-000 $7.40 115 009-610-079-000 $7.40
71 009-611-004-000 $7.40 116 009-610-080-000 $7.40
72 009-611-005-000 $7.40 117 009-610-081-000 $7.40
73 009-611-006-000 $7.40 118 009-610-082-000 $7.40
74 009-611-007-000 $7.40 119 009-610-083-000 $7.40
75 009-611-008-000 $7.40 120 009-610-084-000 $7.40
76 009-611-009-000 $7.40 121 009-610-085-000 $7.40
77 009-611-010-000 $7.40 122 009-610-086-000 $7.40
78 009-611-011-000 $7.40 123 009-610-087-000 $7.40
79 009-611-012-000 $7.40 124 007-033-001-000 $7.40
80 009-611-013-000 $7.40 125 007-033-002-000 $7.40
81 009-611-014-000 $7.40 126 007-033-003-000 $7.40
82 009-611-015-000 $7.40 127 007-033-004-000 $7.40
83 009-611-016-000 $7.40 128 007-033-005-000 $7.40
84 009-610-048-000 $7.40 129 007-033-006-000 $7.40
85 009-610-049-000 $7.40 130 007-033-007-000 $7.40
86 009-610-050-000 $7.40 131 007-033-008-000 $7.40
87 009-610-051-000 $7.40 132 007-033-009-000 $7.40
88 009-610-052-000 $7.40 133 007-033-010-000 $7.40
89 009-610-053-000 $7.40 134 007-033-011-000 $7.40
90 009-610-054-000 $7.40 135 007-033-012-000 $7.40
91 009-610-055-000 $7.40 136 013-240-004-000 $112.82
92 009-610-056-000 $7.40 137 013-240-005-000 $146.36
93 009-610-057-000 $7.40 138 013-240-006-000 $779.99
94 009-610-058-000 $7.40 139 013-240-007-000 $444.57
95 009-610-059-000 $7.40 140 007-123-010-000 $29.40
96 009-610-060-000 $7.40 141 012-013-018-000 $18.90
97 009-610-061-000 $7.40 142 011-241-005-000 $202.47
98 009-610-062-000 $7.40 143 011-241-006-000 $214.05
99 009-610-063-000 $7.40 144 011-241-007-000 $193.93
100 009-610-064-000 $7.40 145 011-241-008-000 $226.86
101 009-610-065-000 $7.40 146 010-202-015-000 $28.66
102 009-610-066-000 $7.40 147 012-390-032-000 $55.76
103 009-610-067-000 $7.40 148 012-390-033-000 $52.08
104 009-610-068-000 $7.40 149 012-320-007-000 $45.13
105 009-610-069-000 $7.40 157 012-390-021-000 $65.67
106 009-610-070-000 $7.40 158 007-082-013-000 $22.05
107 009-610-071-000 $7.40 159 007-112-018-000 $31.50
108 009-610-072-000 $7.40 160 003-194-012-000 $39.13
109 009-610-073-000 $7.40 161 012-133-039-000 $112.68
110 009-610-074-000 $7.40 163 012-280-001-000 $15.66
111 009-610-075-000 $7.40 164 012-280-002-000 $17.10
112 009-610-076-000 $7.40 165 012-280-003-000 $17.25
113 009-610-077-000 $7.40 166 012-280-010-000 $14.83
Assessment Assessor’s Parcel Assessment Assessor’s Parcel Number Number Assessment Number Number Assessment
Assessment Assessor’s Parcel
Number Number Assessment
167 012-280-011-000 $13.45
168 012-280-012-000 $12.90
169 012-280-013-000 $85.29
172 011-143-006-000 $42.00
173 011-143-007-000 $98.00
174 011-143-008-000 $42.00
175 010-193-010-000 $41.91
TOTAL $10,396.21
Exhibit ‘D’
CITY OF MADERA
LANDSCAPE MAINTENANCE DISTRICT
2024-2025 ASSESSMENT
ASSESSMENT DIAGRAM / MAPS
ZONES: 1, 2, 3, 4, 6-A, 6-B, 7, 8, 9, 10-A, 10-B, 10-C, 10- D, 10-E, 10-F, 10-G, 10-H,10-I, 12, 13, 14, 15, 15-
B, 15-C, 16, 17-A, 17-B, 17-C, 17-D, 18, 20-A, 20-
B, 20-C, 21-A, 21-B, 21-C, 21-D, 23, 24, 25-C, 25-
D, 26, 26-B, 26-C,26-D, 27, 27-B, 28, 28-B, 29,
29-B, 29-C, 29-D, 29-E, 30, 31-A, 31-B, 32-A, 32-
B, 33, 34, 34-B, 34-C, 35, 36-A, 36-B, 36-C, 37,
39, 40, 41, 43-A, 43-C, 43-D, 43-E, 44, 45-A, 46,
50 & 51
CITY OF MADERA MADERA LANDSCAPE MAINTENANCE DISTRICT ZONE LOCATION MAP COUNTY OF MADERA STATE OF CALIFORNIA REV. JUNE 2020 FAIR GROUNDS NTS 241
3 35
38 86
4390
6 14
20 52
8 36
7 20
9 37
21 64
22 24
23 25
26 1918
18 22
11 43
16 49
1748
1346
27 54
2 34
131
15 70
12 44
010
ASSESSOR'S
BOOK 13
66 55
59 62
6768
253233
24 28
73 30
75 29
71 31
76 26
77 78
79 80
10 39
40 41
3583
36 84
34 82
37 85
4 81
14 4491
42 89
45 92
5 93
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 1
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2012
AIRPORT BUSINESS
PARK
242
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 1 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MARCH 2020 INCLUSION OF FULL THROTTLE SUSPENSION 243
47 4 20
N SCHNOOR AVE
160
12 14
1 2
23 5
26 7
25 6
27 8
28 9
05 29816 302
14 300
15 301
13 299
26 310
21 305
20 304
22 306
23 307
24 309
25 308
17 18
311 312
19 303
SEE PAGE 2 32
313 24
316
10 317
23 315
07 314
110
070
46 331
332
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 2 (PAGE 1-2)
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
PAGE 1 OF 2 REV. APRIL 2015
PHEASANT RUN /
NORTHWEST ESTATES
AN 18" X 26" VERSION OF THIS MAP PRIOR TO THE
REVISION NOTED ABOVE HAS BEEN RECORDED
WITHIN BOOK 4 OF OF MAPS OF ASSESSMENT
DISTRICTS, PAGES 118 THROUGH 183, ON AUGUST
17, 2007, AS DOC. NO. 2007030644
REVISED APRIL 2015
244
9 132
10 133
11 134
12 135
13 136
14 137
15 138
16 139
17 140
18 141
19 142
20 143
21 144
22 145
23 146
24 147
25 148
42 165
41 164
40 163
39 162
38 161
37 160
36 159
35 158
34 157
33 156
32 155
31 154
30 153
29 152
28 151
27 150
26 149
43 166
44 167
45 168
46 169
47 170
48 171
49 172
50 173
51 174
52 175
53 176
54 177
55 178
56 179 180
57 58
181
59 182
5710
5811
5912
6013
6114
6215
6316
6417
6518
6619
6720
6821 22
69 70
23 7124
7225
7326
74 27
75 28
7629
7730
7831
79 32
8033
8134
8235
8336
8437
8538
8639
8740
8841
8942
9043
61 107
62 106
63 105
64 104
65 103
66 102
67 101
68 100 99
69 70
98 97
71 96
72 95
73 94
74 75
93 92
76 77
91 60108
59 109
58110
57111
56 112
55 113
54 114
53 115
52 116
51 117
50118
49 119
48 120
47 121
46 122
45 123
44 124
31 26
3227
33 28
3429
3530
3631
3732
3833
3934
4035
4136
4237
4338
4439
4540
46 41
47 42
14 09
1510
1611
1712
1813
19 14
20 15
2116
2217
23 18
2419
2520
2621
27 22
28 23
2924
3025 10 05
11 0612 0713 0848 01
49 02
50 03
51 04
52 05
53 06
54 07
55 08
56 09
131 08
130 07
129 06
128 05
127 04
126 03
125 02
183 184 185 186 187 188 189 190 191 192
01 02 03 04 05 06 07 08 09 10
27 278
26 277
25 276
24 275
23 274
22 273
21 272
20 271
19 270
18 269
17 268
16 267
15 266
14 265
13 264
12 263
11 262
10 261
13 247
14 248
15 249
16 250
17 251
12 246
05 285
04 284
03 283
02 282
01 281
08 288
09 289
09 243 242
08 07
241
06 240
05 239
04 238
03 237
14 206
13 205
12 204
11 203
10 202
09 201
08 200
07 199
06 198
05 197
04 196
03 195
10 290
11 291
12 292
01 193
02 194
28 220
27 219
26 218
25 217
24 216
23 215
22 214
21 213
20 212
19 211
18 210
17 209
16 208
15 207
09 260
293 01
294 02295 03
296 04
297 05252 01253 02 254 03
255 04
256 05
257 06
258 07
259
08 286
06 245
11244
10 287
07 BEECHWOOD WAMEADOWREST WAYCLEVELAND AVE
Y
GRAPEWOOD WAY
FOXGLOVE WAY
PLUMWOOD WAY
SUNDANCE LANE
ASPEN LANE
PEPPER TREE LANE
ALDERWOOD CT
BEECHWOOD WAY
090
150
091
37 221
38 222
39 223
48 225
151
34 279
IRONWOOD WAY
35 280
152
GRAPEWOOD CT
153
N SCHNOOR AVE 10
32 29
30 27 06
26 25
31 05
23 53
226
24 130
131
140
141
324
325
323
224 319
326
321 327
320
328
329
33 330
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 2 (PAGE 2-2)
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
PAGE 2 OF 2 REV. APRIL 2015
PHEASANT RUN /
NORTHWEST ESTATES
REVISED APRIL 2015
AN 18" X 26" VERSION OF THIS MAP PRIOR TO THE
REVISION NOTED ABOVE HAS BEEN RECORDED
WITHIN BOOK 4 OF OF MAPS OF ASSESSMENT
DISTRICTS, PAGES 118 THROUGH 183, ON AUGUST
17, 2007, AS DOC. NO. 2007030644
245
SUNSET AVENUE WEST PARK DRIVE
LINDEN STREET
LAUREL STREET R204 1 2 3 4 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 4 ASSESSMENT DIAGRAM CITY OF MADERA PARCEL MAP 18-P-01 REV. FEB. 2019 246
PRINCE LANE 117 38 48 116 37 49 115 36 50 114 35 51 113 34 52 112 33 53 111 32 54 110 31 55 109 30 56 108 29 57 107 73 118 39 47 119 40 46 120 41 45 121 42 44 122 43 43 26 25 24 106105 104 103 5860 61 62 44 45 46 47 48 123 124 125 126 127 42 41 40 39 4938 1285637 13530 50 1295536 13431 51 1305435 13332 52 1315334 13233 57 13664 143 2229 63 142 2358 137 28 62 141 2459 138 27 61 140 2560 139 26 23 144 21 22 145 20 6614619 67148 18 68 149 17 166 1 1 165 2 2 164 3 3 163 4 4 162 5 5 161 6 6 160 7 7 159 8 8 158 72 9 156 71 10 155 70 11 154 13 12 153 14 13 152 15 14 151 16 15 150 69 16 58 1 106 59 2 105 60 3 104 61 4 103 62 5 102 63 6 101 64 7 100 65 8 99 101 44 85 86 29 84 100 43 86 87 30 83 99 42 87 88 31 82 98 41 88 89 32 81 97 40 89 90 33 80 96 39 90 91 34 79 95 38 91 92 35 78 94 37 92 93 36 77 85 28 63 84 27 64 83 26 65 82 25 66 81 24 67 80 23 68 79 22 69 78 21 70 77 20 71 76 19 72 75 18 73 1774 74 1673 75 1572 76 1471 93 1370 94 1269 95 11 6896 10 67 97 9 66 98
CROWN LANEKING LANE QUEEN LANE COUNTESS LANE DOUBLE TREE WAY ROSEWOOD CIRCLE
ROSEWOOD CIRCLE
ROSEWOOD CIRCLE 252 251 1414 246 1515 247 1616 248 1717 249 1818 250 3535 251 3055 198 3156 197 3257 196 3358 195 4359 194 4460 193 4561 192 4662 191 4763 190 11 10 243 12 12 244 1313 245 11 9 60 59
5 4
3 53 52 51 50 10
9 7
6 5
4 3 53 52 51 50 242 241 238 239 237236 235 111 112 113 114 8 8 240
2 2 234
1 1 233 57 57 107 56 56 108 55 55 109 54 54 110 49 49 115 48 48 116 47 47 117 46 46 118 26 26 225 25 25 226 24 24 227 19 19 232 20 20 231 21 21 22230 22 22923 23 228 34 34 217 33 33 218 32 32 219 31 31 30220 30 22129 29 22228 28 223 27 27 224 36 36 216 37 37 215 38 38 214 39 39 213 40 40 41212 41 21142 42 21043 43 209 44 44 208 45 45 119
BOULDER
AVENUE SUBURBAN AVENUE
DOUBLE
TREE
WAY WESTBERRY BOULEVARD 54 71 199 52 70 200 51 69 201 50 25 202 49 60 203 59 58 20 19 18 17 16 15 14 13 12 11 63 62 47 46 45 44 43 42 41 40 39 204 205 206 207 120 121 122 123 125 124 126 127 128 129 38 37 36 35 34 55 54 5 4 61 68 67 66 65 64 45 44 85174 43 86175 42 87176 41 88177 40 89 178 33 31 30 29 27 84 83 81 80 79 77 130 131 132 133 134 173 172 171 170 169 168 179 91 38 180 92 37 181 93 36 182 94 35 183 95 34 184 90 39 253 255 TRAGON
STREET
FAIRMONT CT. EASY CT.
PAINTBRUSH DRIVE 3965 188 3864 189 4066 187 4167 186 4268 185 50 76 167 51 75 166 52 5354 31 66 67 37 36 35 74 73 72 71 70 68 676665 165164 163 162 161 160 159 158157 49 24 23 2259 60 61 55 15 14 1365 64 63 62 7 6
5 4 3 2
1 17 16 15 14 13 12 11 9
8 7
6 5
4 3 2
1 19 21 22 23 24 25 135 136 137 138139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156
RIVERVIEW DRIVE
SUNSET AVENUE WOLFTRAP COURT LOVE CT.
WINDSOX CT. 254 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 4 ASSESSMENT DIAGRAM CITY OF MADERA WESTGATE NORTHWEST 1 & 2 REV. JULY 2011 AN 18" X 26" VERSION OF THIS MAP HAS BEEN RECORDED WITHIN BOOK 4 OF OF MAPS OF ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183, ON AUGUST 17, 2007, AS DOC. NO. 2007030644 247
13 19
133
12 18
134
11 17
135
10 16
136
15 9
137
14 8
138
13 7
139
12 6
140
1521
150
16 22
149
14 20
132
1723
148
18 24
147
19 25
146
2026
145
21 27
144
22 28
143
2329
159
24 30
158
25 31
157
26 32
156
27 33
155
28 34
154
29 35
153
3036
152
31 37
151
32 49
172
33 50
171
34 51
170
35 52
169
36 53
168
37 54
167
38 55
166
39 56
165
40 57
164
4158
163
59 7
19 60
8 20
556121
56 62
22 576323
12 64
24 58
65 25
596626
15 67
27 166828
17 69
2918
81 30
19 82
31 208332
21 84
33 228534
238635
24 87
36 25
88 37
26 89
38 27
90 39
28 91
40 29
92 41
30 93
42 31
94 43
32 95
44 33
96 45
34 97
46 359847
36 99
48 100
3749
101
3850
102
3951
103
405241
114
53 4211554
43 116
55 4411756
45 118
57 46
119
58 4712059
48 121
60 49
122
61 50
123
62 51
124
63 5212564
53 126
6526
127
27 128 129
3 68
130
4 69
131
5 70
132
6 71
133
7 72
134
8 73
135
9 74
10 136
75 11
137
76 138
1 77
139
2 78
12 149
90 13
150
89 1415188
12 152
87 13
153
86 14
154
85 15
155
84 2415683
25 158
82 1915981
20 160
80 21
161
79 1191
1092
9 93
8 94
38 1
131
39 2
130
40 3
129
41 4
128
42 5
127
43 6
126
44 7
125
45 8
124
46 9
123
10 47
122
11 48
121
12 70
120
1371
119
14 72
118
15 73
117
16 74
116
1775
115
18 76
114
19 77
113
2078
112
21 79
111
22 80
110
23 104
109
24105
108
25 106
107
26 107
106
27 108
105
28 109
104
29 110
103
30 111
102
31 112
101
32 113
100
3 99
4 98
5 97
6 96
7 95
43 11
141
142 10
44 160
9 3
161
8 2162
7 1
18 6 6
17 5
5 16 4
4 15
3 314 2
2 13
1 1
22 8
2612
16 4
20 6
19 5
14 3
13 2
11 1
TREVOR WAY
DUTRA WAY
JUDITH WAY
FREDERICK WAY
JONATHAN WAY
FREDERICK COURT
JUDITH COURT
DUTRA COURT
TREVOR COURT
WEST CLEVELAND AVENUE
STEPHANIE LANE
SCHNOOR AVENUE
421
420
440
441
21 7
2511
390
NORTH
FRESNO RIVER
422
27 9
67 66
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 3
ASSESSMENT DIAGRAM CITY OF MADERA
MANSIONETTE ESTATES 1, 2, & 3
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
REV. APRIL 2015
248
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 6A
ASSESSMENT DIAGRAM CITY OF MADERA
WOODLAND HILLS/BASILA
REV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
249
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 6B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA SUNSET SOUTHWEST I, II, III, IV & V
CITY OF MADERA
REV. JULY 2008
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
250
TOWN AND COUNTRY ESTATES
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 7
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
251
CONCORD CT.
CONCORD AVENUE
HELENA WAY
MADRID LANE SENECA DRIVE
COLOMBARD DRIVEMADERA AVENUE
1 2 3
4 5
6 7 8 9
1 2 3 4
81 82
8384
8586
87 5
114 115 116 117 118 119 120 121 122 123 124 125 126
113 112 111 110 109 108 107 106 105 104 103 102 101
88 89 90 91 92 93 94 95 96 97 98 99 100
6 7 8 9 10 11 1 2 3 4 5 6 7
134 133 132 131 130 129 128 127
135 136 137 138 139 140 141 142
149 147 147 146 145 144 143150 151 152 153 153 155 156
192 191 190 189 188 187 186179 180 181 182 183 184 185
24 2325 26
22 2127 28
20 19
29 30
18 17
31 32
16 15
33 34
14 13
35 36
12 15
37 16
14 13
17 18
12 11
19 20
10 9
21 22
8 23
50 49 48 47 46 45 44 43 42 41 40 39 38 30 29 28 27 26 25 24 178 177 176 175 174 173 172 171 170 169
157158159
160
161162163164165166167168
118
36 119
37 120
38 121
39 122
40 123
41 124
42 125
43 126
44 127
45 128
46 129
47 130
48 117
35 116
34 115
33 114
32 113
32 112
30 111
29 110
28 109
27 108
26 107
25 106
24 105
23 10
92 11
93 12
94 13
95 14
96 15
97 16
98 17
99 100
18 101
19 102
20 103
21 104
22 9 10 11 1 2 3 4 5 6 7
6 7 8 9 10 11 55 56 57 58 59 60 61
6 7 8
24 24
23 23
22 22
21 21
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
15 69
14 68
13 67
12 66
11 65
10 64 63
9 62
8 25
25 26
26 27
27 28
28 29
29 30
30 31
31 32
32 33
33 34
34 35
35 36
36 37
37 16
70 17
71 18
72 19
73 20
74 21
75 22
76 23
77 5050
4949
4848
4747
4646
4545
4444
4343
4242
4141
4040
3939
3838
3084
2983
2882
2781
2680
2579
2478
131
13 132
12 133
11 134
10 135
9 136
8 137
7 138
6 146
14 145
15 144
16 143
17 142
18 141
19 140
20 139
21 153
22 152
23 151
24 150
25 149
26 148
27 147
28 162
35 163
34 164
33 165
32 166
31 167
30 168
29 66 67 68 69 70 71 72
175 174 173 172 171 170 169
65 64 63 62 61 60 59
181 182 183 184 185 186 187
58 188
57 189
56 190
55 191
54 192
53 193
52 194
51 195
50 196
36 15437 15538 15639 15740 15841 15942 16043 16145 17646 17747 17848 179 49 180
3 854 865 876 887 898 909 91
5 5
4 4
3 3
2 2
1 1
6 202
7 203
8 204
9 205
5 201
4 200
3 199
2 198
51 54
1 197
52 3
53 4 73
310
312
310
320
311
340
330
GARY LANE
MONTEREY AVENUE
54 CITY OF MADERA
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 8
ASSESSMENT DIAGRAM
VINEYARD ESTATES 2, 3, 4 & 5
REV. JULY 2008
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
252
36 36
38 0808
10 09
09 11
1010
12 111113
121214
1313
15 1414
16 1515
17 1616
18 171719
1818
20 1919
21 2020
22 2121
23 2222
24 07
07 09 06
06 08
05 05
07 04 04 06
12 68 68
8 64 64
9 65
65 10
66 66
35 35
37 3434
36 3333
35 3232
34 31
31 33
3030
32 2929
31 2828
30 2727
29 2626
28 2525
27 2424
26 23
23 25
3737
39 38
38 40
3939
41 4040
42 4141
43 424244
4343
45 44
44 46
4545
47 4646
48 47
47 49
484850
03 03 0502 02 04
01 01 03
11 67 67
7 63 63 6 62 62 1 57 57
5 61 61 2 58 58
3 59
59 4
60 60
55 54 53 56
50 49
53 52 51 5453 52 51 54
50 49
52 51
MACADAMIA AVE
CHESTNUT AVE
FILBERT STREET
ACORN CT
CASHEW CT
WATT ST
HICKORY AVE
01 40
02 41
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 9
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
ORCHARD ESTATES
SUBDIVISION
REV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
253
1 & 2
34 7
6 5
8 910
11 1213
12 37
6 12
5 7
11 13
8 4 1
5 7
2 3
10 9
1117
16 10
9 15
14 ASSESSOR'S BOOK 6
PAGE 46
33 450
34 2
4 6
8 CITY OF MADERA ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10A
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
VENTURI SUBDIVISION
REV. JULY 2011
254
492 491
460
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
PEBBLE BEACH I & II
CITY OF MADERA
REV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
255
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERAREV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
256
495
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10D
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
PEBBLE BEACH V
CITY OF MADERA
REV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
257
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10E
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
PEBBLE BEACH
PHASE VI
SUBDIVISION
CITY OF MADERA
REV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
258
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10F
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
PEBBLE BEACH
PHASE VII
SUBDIVISION
CITY OF MADERA
REV. JULY 2011
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
259
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10G
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
PEBBLE BEACH
PHASE VIII
SUBDIVISION
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
260
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10H
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
PEBBLE BEACH
PHASE IX
SUBDIVISION
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
261
LIGHTHOUSE DRIVE
BAY VIEW DRIVE
CYPRESS COURT
MAINBERRY DRIVE
SUNSET AVENUE
14 14
OUTLOT ~A"
REMAINDER
MAINBERRY DRIVE
LIGHTHOUSE COURT
14 222222 21 20
21 21
19 18 17
19 18 1719 18 17
20 20
15 1615 1615 16
131313 12 11
1212
1111
101010
99978
78 78
56 56
56 34
43 43
2 12 12 1
VENTURI COURT
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 10i
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
PEBBLE BEACH
PHASE X
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
262
1 2
3 4
5 6 7 8
910 1112 13 14 15 16
17 18
19 20 21 22 23 24 25 26 27 28 29 30
31 32
33 35
34 DOUBLE TREE WAY 5 6 7 8
1 2
3 4
1 2
3 4
5 6 7 8
19 20 21
20 21 22
22 23 24
43 44 45
25 26 27 28
46 47 29 30
29 30
31 32
35 34
33 31
33 32
37 38 39404142
91011121314 15
17 16
16 17 18
18 19
41 42
43 44 45 46 47 48 49
39 40
70 69
68 67
63 62
61 60 59 58 57 56 55
8054
79 78 77 76 75 74
73 72
71 38
37 81
53 52
51 82
50 64
65 66
TRABON WAY 480
470
ASSESSOR'S BOOK 6, PAGE 47
36 ASSESSOR'S BOOK 6, PAGE 48
48 15
47 14
46 13
45 12
44 11
43 10
42 9
41 8
40 7
39 6
37 38
35 34
36 63
64 65
66 67
68 69 70 71
58 59 60
61 62
4 5
39 25 26
27 28 29
30 49
2 1
32 33
34 35
36 37 38
51 50 17
49 16
18 78 46
79 47
52 19
53 20
54 21
55 22
77 45
76 44
75 43
23 40
24 41
7442
73 72
57 56
TRAGON STREET
SUMMER SET LN
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 12
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
FRENCH COVE
1 AND 2
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
263
49 50
51 5253
54 55
57 56
24 25 26 27
28 3839
30 29
36 31
37 32
34 33
35 4140
LAS CASAS LANE
LAS FRESAS WAY
40 39
3231
3029
2827
3536
37 38
3334
23 24 25 26
50 51
52 53
54 55
57 56
55 49
56 57
58 59
60 61
63 62
7767
67 7868
68 66
65 64
63 62
61 66
65 64
63 62
61 76
75 74
73 72
71 5958
5958
6968
60 60
70 LOS ARCOS LANE
38 1 01 01
2 0202
3 0303
4 0404
05 5
05 06
6 06
07 7
07 08
8 08
09 9
09 101010
11 11
11 121212 13 13 13
14 14
14 15
15 15
16 16
16 17
17 17
18 18
18 19
19 19
202020
21 21
21 22
22 22
23 24 25 26
40 39
42 41 4143 42 4244 43 43
45 44
44 46
45 45
4746
46 484747
49 48
48 32
3130
29 28
27 VARABELLA PARK
LAS PERLA LANE
VARABELLA LN
3334353637 SOUTHERN PACIFIC RAILROAD
ROOSEVELT AVE
OLIVE AVE
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 13
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
LAS PALMAS ESTATES
1, 2, 3 AND 4
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
264
DEERWOOD CT
CHIANTI CT
CHIANTI CT
GAMAY STREET
MERLOT STREET
STADIUM RD
ALMOND AVE
BLUERIDGE DRIVE
SANTA BONITA STREET
SANTA BONITA STREET
BLUERIDGE
DRIVE
5353
5252
5151
50 50
49 49
47 47
48 48
46 46
4545
7 7
8 8
9 9
1010
11 11
1212
1313
14 14
15 15
1616
17 17
1818
19 19
20 20
2121
4682
38 38
4583
37 37
36 36
3535
34 34
3333
32 32
31 31
30 30
2929
28 82
2727
26 26
25 25
3296
3395
34 94
3593
36 92
3791
38 90
3989
4088
41 87
4286
4385
44 84
4781
48 80
49 79
50 78
5177
52 76
54 74
5375
5573
5672
57 71
5870
5969
6068
6167
6266
26 102 101
27 25
103
16 112
15 113
14 114
13 115
65 12
6411
6310
6209
61 08
1 1
2 2
3 3
4 4
5 5
6 6
22 22
23 23
24 24
44 44
43 4342 4241 4140 4039 39
01 54
02 5503 5604 57
05 5806 5907 60
108 20 107 21
106 22
105 23 110 18
109 19
97 31
98 30
99 29
100 28 104 24
111 17 STA CRUZ
ST
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 14
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CAPISTRANO 1 and 2
SUBDIVISION
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
265
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 15
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
266
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 15B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
267
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 15C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CLINTON ELM RANCHOS
PHASE III
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
268
1 1
1 2
2 2
3 3
3 4
4 4
8 8
8 7
7 7
6 6
6 5
5 5
24 24
24 23
23 23
22 22
22 21
21 21
20 20
20 19
19 19
18 18
18 17
17 17
16 16
16 15
15 15
14 14
14 13
13 13
12 12
12 11
11 11
9 9
9 10
10 10
OUTLOT "C"
LILLY STREET
SOQUEL COURT
SAWMILL STREET
OUTLOT "B"
OUTLOT "A"
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 16
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
SUGAR PINE
ESTATES
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
269
73 72 71 70 69 68 67 66 65
6364
7333
41 1 2
42 3
43 4
44 5
45 6
46 7
47 8
48 9
49 72
32 71
31 7030
69 29
68 28
5010
51 11
52 12
53 13
54 14
55 56 16
15 6727
66 26
65 25
6424
17 5857
18 59 19
62 63
23 22
21 61
60 20
WINTER WAY
REN WAY
WESTBERRY BOULEVARD
KENT DRIVE
KENT DRIVE
WESTGATE DRIVE
29 29
30 30
3131
32 32 33
33 34
34 35
35 36
36 37
37 19 20 21 22 23 24 25 26 27
30 40
39 40
39 29
38 38 28
23 2313
10 2020
9 19
19 7
1717
8 1818
5 15
15 6
1616
4 14
14 3
13 13 12
2 12
1 11
11 18
28 28
ZAK WAY
24 14 24
2515 25
26 16 26
2717 27
112121 12
2222
450
451
53 52 51 50 48 49 46 47 45 44
1 31
2 32
3 33
4 34
5 35
6 36
7 37
8 38
9 39
1040
41 42 43 44 45 46 47 48 49 50 51 52 53 54
55 59
585756
60 61
62 01 02 03 04 05 06 07 08 09
74 75 76 77 78 79 80 81 82
1 2 3 4 5 6 7 8 9
19 20 21 22 23 24 25
92 93 94 95 96 97 98
19 20 21 22 23 24 25
10 11 12 14 13 16 15 17 18
1891
17 90
1689
15 88
1487
13 86
1285
11 84
1083
SUMMER LANE 520
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 17A
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CAPISTRANO X
PHASES 1 AND 2
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
270
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 17B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CAPISTRANO X
PHASE 3
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
271
WESTGATE DRIVE
TIMBERLINE DRIVE SUMMER LANE
14 14
14 13
1313
1212
12 1111
11 1010
10 99
9 88
8 7
77 66
6 20
20 20
2323
23 2121
21 22
22 22
19 19
24 24
24 19 17
17 17
26 26
26 35
35 35 34
34 34
3333
33 32
3232
3 3 3
3131
31 29
29 29
30 30
30 1818
18 25
2525
1616
162727
27 15
1515
28 2828
2 2 2
1 1 1
4 4 4
5 5 5
WESTBERRY BOULEVARD
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 17C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CAPISTRANO X
PHASE 4
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
272
1 1
1 22
2 3
33 4
4 4
55 5
6 6
6 77
63 8
3026
34 29
27 33
2828
32 2729
31 25
30 24
24 26
2323
25 2222
24 2020
22 21
2123
19 1921
18 1820
17 1719
15 15
16 1414
15 42
4141
45 4040
44 39
3943
38 38
42 4343
48 4444
49 4545
50 31 31
3635
32 32
37 33 333834 3439 35
36 35
36 40
37 37 41
10 9 9
10 10 1111 11 12
12 12 13
13 13 14
SUMMER LANE
WINTER WAY
REN WAY
DOUBLE TREE WAY
WOLFTRAP STREET
16 59
9 61 55 47 46
42 58
16 57
25 60
26 8
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 17D
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CAPISTRANO XI
PHASE 1
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
273
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 18
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
LINCOLN PLACE
PHASES 1, 2 AND 3
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
274
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 20A
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
LA JOLLA
PHASE 1REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
275
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 20A CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. NOVEMBER 2019 INCLUSION OF SUBDIVISION 18-S-01 276
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 20B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
LA JOLLA
PHASE 2
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
277
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 20C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
LA JOLLA
PHASE 3
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
278
23 22 21
20 19 18 17
14 15 16
11 12 13
8 9 10
5 6 7
3 4
1 2
45 43
44 42
WEST CLEVELAND AVENUE
NORTH WESTBERRY BOULEVARD
GLENVILLE AVENUE COMMON WAY
FORUM WAY
ASHBURY AVENUE
GLADE AVENUE
2525
24 24 23 22 65
19 18 17
16 15 14 1
2 3
4 5 6 7
8 9
1110
12 13
47484950
51 52
53 1
2 34
5 6
7 60
59 58
57 56
55 1413
12 11
10 9
8 64
44 45
12 3
4 5 6 7
8 9
1110
12 1413
15 16
17 18
19 20 21 22 41 23
24 2526272829
30 31
54 33
32 3736
35 34
38 39
40 ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE-21A
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
HOME RANCH
CITY OF MADERA
Phase I
(VERIFY ASSESSMENT NUMBER.)
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
279
61 62
63 86 87 3 4 5 6
7 89
10 11
12 13
14 15 16 17 18
20 19
21 22
2524
23 2627
79 30
77 33
34 35
83 38 85 41 42
43 44
84 47 48
49 50
51 52 53
54 55
56 57 58
59 60
61 62
80 82
6968
70 67
71 72
81 73
74 75
4 5 6 7 8 9
10 11
12 13
14 15
1617
18 19 20 21
23 22
24 25
27 26
28 2930
3231
33 34 35
36 37
38 39
40 41 42 43 44
46 45
47 48 49 50
51 52
53 54
55 56
57 58
59 60 61
62 63
64 66
67 68 69
72 70
73 74 75
76 77
78 4
5 6 7 8 9
10 11
1213
1415
16 17
19 20 21 18 23
22 2425
2726
28 29
30 31
32 33 34
35 36
37 38
39 40
42 41
43 44 45
46 47
48 49
50 51
52 53
54 55 56
57 58
59 65
60 61 62 63 64
6665
67 68 69
70 71
72 1
2 3
1 2
3 NORTH WESTBERRY BOULEVARD
LARRETE AVE.
PENNY WAY
MANDANA WAY
HILLSBORO AVE.
GLENVILLE
AVE.
FAIRWAY
AVE.
ARIES COURT
GLADE AVE.
EXPRESS COURT
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE-21B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
HOME RANCH
CITY OF MADERA
Phase II
REV. APRIL 2015
280
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 21C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2009
281
ASSESSMENT DIAGRAM MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 21 D CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. NOV 2018 282
ASSESSMENT DIAGRAM MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 21D CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. OCTOBER 2019 283
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 21D CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MARCH 2020 INCLUSION OF RANCHO SANTA FE - TRACT 19-S-06 PAGE 1 OF 2 SEE PAGE 2
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 21D CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MARCH 2020 INCLUSION OF RANCHO SANTA FE - TRACT 19-S-06 PAGE 2 OF 2 SEE PAGE 1
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 23
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
ELM ESTATES II
SUBDIVISION
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
284
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 24
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
VISTA DEL SIERRA
SUBDIVISION
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
285
MARIE DRIVE
GLADE AVENUE
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 25C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
COTTONWOOD III
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
286
REV. JULY 2010
CITY OF MADERA
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 25D
ASSESSMENT DIAGRAM
287
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 26
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CORDOVA ESTATES
PHASES 1 AND 2
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
288
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 26B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
289
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 26C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
290
LAGUNA WAY
OUTLOT "A"
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 26D
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
OAKWOOD ESTATES
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
291
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 27
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
VINEYARD WEST I
SUBDIVISION
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
292
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 27B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
VINEYARD WEST II
SUBDIVISION
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
293
ST. TROPEZ DR.
EAGLE WAY
OAK STREET
DESERT RANCH WAY
MAPLE STREET
PLUMAS STREET
MAKENNA DRIVE
18 1716151413
11 10 9
3130292827
2223242526
21 20 19
32 33 36 35 34
8685848382
41 40 39 38 37
5150494847 46
42434445
7475767778798081
61 60
52535455
57 58 59
56 62 63 64
66 73727170696867
12 65 8
ST. TROPEZ DR.
1 9 10 11 12 13
18 17
16 15
14 19 20 21
21 22
23 24
25 26
32 3130
29 28
33 34 35 36 37 38 39 40 41
42 43
44454647
51 50
49 48
52 53
54 55
56 57
58 58
60 61 62 63 64 65 66
67 74
73 72
7170
6968
7576
77 7879
80 81
82 8786
85 84
83 12 11 10 9 8
17 16
1514
13 18 19 20
21 22
23 242526
323130
292827
33 34 35 36 37 38 39 40
41 86
42 43
44 45
46 5150
49 48
47 52
53 54
55 56
57 58
59 60 61 62 63 64 65
66 73
727170
69 68
67 7475
76 77
78 7980
81 85
84 8382
MAKENNA DRIVE
HOWARD ROAD
1 2
2 234
56 7
3456
7 3
4 5
6 78
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 28
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CAPISTRANO XII
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
294
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 28B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CAPISTRANO XIII
SUBDIVISION
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
295
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 29
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CHATEAU AT THE
VINEYARDS
PHASE I
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
296
ASSESSMENT DIAGRAM MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 29 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA LA SPEZIA II SUBDIVISION REV. OCT. 2020 297
ASSESSMENT DIAGRAM MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 29 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA LA SPEZIA III SUBDIVISION REV. OCT. 2020 298
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 29B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CHATEAU AT THE
VINEYARDS II
CITY OF MADERA
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
299
MONTEREY STREET WEST ALMOND AVE.
GARY LANE
ST. MONTELENA DRIVE
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 29C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CHATEAU AT THE
VINEYARDS
PHASE III
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
300
REV. JULY 2010
CITY OF MADERA
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 29D
ASSESSMENT DIAGRAM
CHATEAU AT THE
VINEYARDS
PHASE IV
301
1 23
45 6
7 8 9 10 11
12 13
14 15 16 17
18 19
20 21
22 23
24 ST. MONTELENA
COURT
STREET MONTEREY
123
4 5
21 22
23 24
20 19
18 17 16 15
6 7
8 9 10 11
12 13
14 WEST ALMOND AVENUE
AVENUE 13 1/2
1 2
3 4
5 6
7 8 9 10 11
12 13
14 15 16 17 18
19 20
21 22
23 24
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 29E
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
CHATEAU
AT THE VINEYARDS
EAST
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
302
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 30
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
YOSEMITE ESTATES
SUBDIVISION
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
303
PECAN AVENUE
RAYMOND THOMAS STREET SAUNDERS AVE.
LEMON AVE.
TANGERINE AVE.
VALENCIA AVENUE
PERKINS AVE.
NAVEL
AVE.
PARKWOOD AVE.
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 31A
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
THE HIGHLANDS AT
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
RANCHO VALENCIA
PHASE I
304
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 31B (PAGE 4 of 4)
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
SEE PAGE 3
HIGHLANDS AT
RANCHO VALENCIA
PHASE II
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
305
44 43 42 41 40 39 38 37 36 35 34 33 32
54 1 2 47 48 49
26 50
27 28 29 30
51 53
3938 37 36 35 34 33 32
31 26 27 28 29 30
654321
7 8 9 10 11 12 13
14 7 8 9 10 11 12 13
14 15
15 16 17 18 19 20 21 22 23 24 251617 18 19 20 2122 2324 25161718 19 20 2122 2324 25 7 8 9 10 11 12 13
14 15
26 654321
27 28 29 30
31 39 38 37 36 35 34 33 32 4443424140
4443424140
46 45
46 45
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 32 A
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
LA JOLLA ESTATES
NORTH PHASE I
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
306
15 ELLIS STREET
LA JOLLA WAY
JADEN
COURT
ZAPATA
SALVADOR WAY
JOSEPHINE COURT JOSEPHINE AVENUE
STREET 14 13 12 11 10 9 8 7 6 5 4 3 2 1
32 17
18 19 20 21 22 23 24 25 26 27 28 29 30 31
42 41 40 39 38 37 36 35
34 33
16 47 46 45 44 43
5958 5756 55 54 5352 51 50 49 48 47
76 75 74 73 72 71 70 69 68 67 66 65 64
62 63
61 91 90 89 8887 86 8584 83 82 81 80
79 78 77
60 13 12 02 03 04 05 06 07 09 08 10 11
19 18
16 17
15 14
30 29 28 27 26 25 24 23 21 20 22
45 44 43 4241 40 3938 37 36 35 34
33 32 31
01 92
46 47
93 ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 32B
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
LA JOLLA ESTATES
NORTH PHASE II
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
307
STORM DRAINAGE POND
AVENUE 13
MACADAMIA
AVENUE HICKORY
WAY LYNMARIE
WAY ALEXIS
WAY TEVIN
LANE KIMBERLEY
WAY BARNETT
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 33
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
SOUTH STAR
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
ESTATES
308
TRUMAN DRIVE
COOLIDGE STREET
MONROE AVENUE
MADISON DRIVE
ADAMS AVENUE
POLK
TYLER LANE
PHASE 1
AVE.
HOOVER AVENUE
LACRETA
AVE.
ADANAC
WAY
PHASE 2
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 34
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
KENNEDY ESTATES
PHASE I & II
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
309
REV. JULY 2010
CITY OF MADERA
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 34B
ASSESSMENT DIAGRAM
310
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 34C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
311
2 34 56789 10 11 12 13 14 15 16 17 18 19
20 21222324
25 26
28 29 30 31
9089
888786
81828384
85 32 33 34 35
7172
737475
8079787776
36 37 38 39
61 62636465
7069686766
40 41 42 43
5152535455
6059585756
44 50494847
46 01
0101
27 2 34 56789 10 11 12 13 14 15 16 17 182 34 56789 10 11 12 13 14 15 16 17 18 19 20
21222324
25 26
27 27 28
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
4545
5049484746
504948
4746
51 52535455
5160
52535455
59585756
6059585756
6162636465
61706263
6465
69686766
7069686766
71727374
75 80
79787776 75
7172
7374
8079787776
9089
888786
8182838485
90898887
86 8182838485
19 20
21222324
2526
SANTA LUCIA DRIVE
SAN JUAN DRIVE
POINT SUR DRIVE
MANRESA DRIVE
SEASIDE DRIVE
MARINA DRIVE
ASILOMAR DRIVE
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 35
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
SANTA BARBARA
ESTATES
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
312
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
ZONE 36A
CITY OF MADERA
REV. JULY 2010
DOME AVENUE
1 PARCEL LOT BOUNDARY
ZONE BOUNDARY
10 SUBDIVISION LOT NUMER10 ASSESSMENT NUMBER10 ASSESSOR'S PARCEL NUMBER 101 ASSESSOR'S BOOK NUMBER
1 BRIDGE WAY
MONARCH ROAD TRAIL WAY
MARIPOSA STREET MARIPOSA
STREET
OSO DRIVE
ARDILLA DRIVE
KNOX STREET
22 33
4 4
5 5
66 77
8 8
99 1010
11 11
12 12
13 13
14 14
1515
1616 1717
1818
1919
2020
2121
2222
2323
2424
2525
2626
2727
28 28
2929
30303131
32 32
33 33
3434
35 35
36 36
3737
3838
3939
40 40
41 41
4242
43 43
4444
4545
4646
4747
4848
4949
5050
5151
52 52
102102
101101
100100
9999
9898
9797
96 96
9595
9494
9393
92 92
91 91
5858
5959
60 60
61 61
6262
6363
64 64
6565
6666
67 67
6868
103103
104104
105105
106106
107
107
108108
109109
110110
114114
113
113
112
112
111
111
140140
115115
116116
139139
138
138
117
117
118118
137
137
136136
119
119
135135
134134133133
132
132
131131
120
120
121121122
122
123123124124
130130
125
125
126126
129129128128
127127
8383
84 84
8585
86 86
8787
8888
8989
90 90
78 78
7979
8080
81 81
8282
77 77
76767575
74 74
7373
72 72
7171
70706969
5757
56 56
55 55
5454
5353
9 10 11 12 13 14 15 16 17
18 1 2 3 4 56 78
19 20
21 22
23 24
1 2
3 4
5 6
7 48 37
38 47
46 39
40 45
44 4143
92 91
90 89
42 7980
81 82
88 83
84 87
86 85
52 53
54 36
48 49
50 51
3132
33 34
35 30
2928
2726
25 47
46 45
3332
31 30
29 9 10 11 121314 15 16 17 18 19 20 2122 232425
66262728
65 64 63 62 61 60 59 58 57 56 55
34 35 36 37 38 39 40 41 42 43 44
67 68 69 70 71 72 73 74 78 77 76 75
8 313
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
ZONE 36B
CITY OF MADERA
REV. JULY 2010
DOME AVENUE
PARCEL LOT BOUNDARYZONE BOUNDARY
10 SUBDIVISION LOT NUMER10 ASSESSMENT NUMBER10 ASSESSOR'S PARCEL NUMBER 101 ASSESSOR'S BOOK NUMBER
MARIPOSA STREET9 10
114 113 112 111
1 1
77 7675
747372
71 44
3 3
2 2
1010
99 8877
6 6
5 5
98 11
10 1716
1514
13 12
314
OSO DRIVE
ARDILLA DRIVE
LOS CERRITOS WAY
KNOX STREET
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 36C
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
OLIVE ESTATES
REV. JULY 2010
AN 18" X 26" VERSION OF THIS MAP HAS BEEN
RECORDED WITHIN BOOK 4 OF OF MAPS OF
ASSESSMENT DISTRICTS, PAGES 118 THROUGH 183,
ON AUGUST 17, 2007, AS DOC. NO. 2007030644
315
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 37
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
316
ASSESSMENT DIAGRAM - PAGE 1 OF 2 MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 39 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JULY 2010 317
318
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
ZONE 40
LEGEND
PARCEL LOT BOUNDARYZONE BOUNDARYSUBDIVISION LOT NUMBER
ASSESSMENT NUMBERASSESSOR'S PARCEL NUMBERASSESSOR'S BLOCK NUMBER 2 1
3 4
9 8
76 5
10 11
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
27 28 29 30 31 32 33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48 49 50 51 52 53 54
55 56
57 58
61 60
59 62 63 64 65
70 67
68 71
70 69
72 73 74 75
76 77
78 2
1 3
4 9
8 76
5 10
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
27 28 29 30 31 32 33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48 49 50 51 52 53 54
55 56
57 58
61 60
59 62 63 64 65
66 67
68 71
70 69
72 73 74 75
76 77
78 6
5 7
8 9
1110
45 46 47 48 49 50 51 52 53
68 69
66 71
72 75
74 73
76 77 78 79
80 81
82 13
12 14
15 16 17 18 19 20 21 22 23 24 25 26 27
34 35 36 37 38 39 40 41 42 43 44
54 55
66 67
28 29 30
31 32 33
56 57 58
59 60
61 62
65 64
63 319
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 40 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MARCH 2020 INCLUSION OF RAI APARTMENT COMPLEX 320
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 43A (PAGE 1 OF 4)
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
ORCHARD POINTE
REV. JULY 2010
PHASE I&II
321
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 43A (PAGE 2 OF 4)
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
ORCHARD POINTE
REV. JULY 2010
PHASE I&II
322
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 43A (PAGE 3 OF 4)
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
ORCHARD POINTE
REV. JULY 2010
PHASE I&II
323
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 43A (PAGE 4 OF 4)
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
ORCHARD POINTE
REV. JULY 2010
PHASE I&II
324
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
ZONE 43C (PAGE 1 OF 3)
CITY OF MADERA
REV. JULY 2010
1 PARCEL LOT BOUNDARYZONE BOUNDARY
10 SUBDIVISION LOT NUMER10 ASSESSMENT NUMBER10 ASSESSOR'S PARCEL NUMBER 101 ASSESSOR'S BOOK NUMBER
1 MIRA LOMA
WAY
SAN GABRIEL DRIVE
LA QUINTA WAY
PASEO DEL MAR PARKWAY
LINDA MESA DRIVE
VERDE MESA WAY
2 2
33 4
4 5
5 66 7
7 88
99 1010
118
118
121121
117
117
122
122
123123
124
124
148148
175
175
149
149
174
174
150
150
173
173
151
151
172
172
178178
205
205
179
179
204
204
180180
203203
181181
202202
177
177
206
206
147
147
176
176
119119
120120
78 78
7777
76 76
7575
74 74
73 73 72
72 71
71 70
70 68
68 67
67 69
69 NTS
1 2 3 11 1
1 1
1 1
10 10
10 4
56 7
8 22
23 51
28 27 26 25 24 23
22 21
2019
58 29
50 30 57
56 31 49 24
25 48 32 55
26 47 33 54
18 17
325
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
ZONE 43C (PAGE 2 OF 3)
CITY OF MADERA
REV. JULY 2010
PARCEL LOT BOUNDARY
ZONE BOUNDARY
10 SUBDIVISION LOT NUMER10 ASSESSMENT NUMBER10 ASSESSOR'S PARCEL NUMBER 101 ASSESSOR'S BOOK NUMBER
LA QUINTA WAY
PASEO DEL MAR PARKWAY
LINDA MESA DRIVE
DEL LAGO
LANE
KNOX STREET
RANCHO MIRAGE ROAD
4848
49 49
50 50
5656
5555
5454
53 53
52 52
51 51
5757
58 58
60 6059
59 6262
6161
HACIENDA WAY
192192
194
194
193193
189189
190190
191191
186186
187
187
188188
195195
197197196
196
164
164
163163
162
162
159159
160160
161161
156
156
157
157
158158
167167166166
165165
132132
133
133
134
134
130130
131131
129
129
NTS
6666
64 64
6363
6565
201201
200
200
199
199
198198
183183
184
184
185
185
182
182
155155
168
168
154
154
169
169
153
153
170170
152152
171
171
126126
127127
128
128
125
125 09
10 11
12 13
14 27
28 29
30 31
32 4645
44 43
42 41
34 35
36 37
38 39
5352
51 50
49 48
16 15
14 1312
11 47 15
16 17
18 19 20 21 01 02 03 04 05 06
33 34
35 36
40 39
38 37
40 41
42 43
46 45
44 10
09 08
07 326
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
ZONE 43C (PAGE 3 OF 3)
CITY OF MADERA
REV. JULY 2010
PARCEL LOT BOUNDARY
ZONE BOUNDARY
10 SUBDIVISION LOT NUMER10 ASSESSMENT NUMBER
10 ASSESSOR'S PARCEL NUMBER
101 ASSESSOR'S BOOK NUMBER
RANCHO MIRAGE ROAD
KNOX STREET ORTEGA DRIVE
RANCHO SANTE FE DRIVE
LOMA LINDA LANE
LOMA LINDA
COURT
CORONA DRIVE LA COSTA COURT
VERDE MESA WAY
1818
19 19
20 20
21 21
2222
23 23
2424
2525
26 26
2727
28 28
2929
3030
3131
3232
3333
3434 35
35 3636
38 38
37 37
43 43
42 42
4141
4040
39 39
139139140140
141
141
142142
143143
144144
145
145
146146
9999
98 98
97 97
104104
103103
102102
101
101100
100
79 798080
8181
8282
83 83
84 84
8585
86868787
9191
90 90
8989
88 88
96 96
9595
94 94
93 93
92 92
NTS 17
17 1616
1414
15 15
13 13
1212
11 11
46 45
45 4444
4747
46 135
135
136
136
137137
138138
107107
106
106
105105
108108
109
109
110110
116
116
115115
114114
113
113
112
112
111
111
08 09 10 11
12 13
14 15
16 17
18 45 62
46 61
47 60
48 59
49 58
50 57
51 56
52 72 88
71 70
89 90
69 91
92 68
67 93
66 94
65 95
64 96
82 81 80 79 78 77 76 75 74 73
86 87
44 43
42 41
40 39
3837
36 3534
33 32 3130
19 20
21 22 23 24 25 26 27 28 29
53 55
54 63 97
327
01 02 03 04
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 43D
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
ALMOND VILLAGE
ESTATES
CITY OF MADERA
REV. JULY 2009
328
1 1
1 20
20 20
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
7 7 7
8 8 8
9 9 9
10 10 10 11 11 11
12 12 12
13 13 13
14 14 14
15 15 15
16 16 16
17 17 17
18 18 18
19 19 19
EAST OLIVE AVE (AVENUE 14)
WALLACE AVENUE
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 43E
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
TAYLOR ESTATES
REV. JULY 2010
329
DON MIGUEL ST.
SOUTH D ST.
SOUTH C ST.
E. OLIVE AVE. 14TH ST. 202 REV. FEB. 2019 CITY OF MADERA CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 44 ASSESSMENT DIAGRAM SIERRA VISTA ESTATES 330
ASSESSMENT DIAGRAM
MADERA LANDSCAPE MAINTENANCE DISTRICT
CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA
CITY OF MADERA
REV. JULY 2010
ZONE 45A
331
332
333
1 2 3 4 10 11 12 5 6 7 8 9 OUTLOT B OUTLOT A OUTLOT A OUTLOT C CENTRAL AVENUE NORTH "C" STREET
NORTH "A" STREET
NORTH "B" STREET FRESNO RIVER City of Madera RIVERWALK DRIVE ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. APR. 2019 INCLUSION OF RIVERWALK SUBDIVISION NO 17-S-03 334
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MAY 2019 INCLUSION OF LOVE'S TRAVEL STOP 335
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MAY 2019 INCLUSION OF "THE TINT SHOP", 107 CYPRESS 336
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MAY 2019 INCLUSION OF MADERA COUNTY HEALTH AND HUMAN SERVICES 337
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MAY 2019 INCLUSION OF BOSTON MOTORS 338
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MAY 2019 INCLUSION OF 317 W OLIVE AVENUE - STARBUCKS 339
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MAY 2019 INCLUSION OF 363 E ALMOND AVENUE - PALEPINO LLC 340
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JUNE 2019 INCLUSION OF CROWN TOZER SUBDIVISION 19-S-03 341
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MAY 2019 INCLUSION OF BURGER KING, 1230 MADERA AVENUE 342
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JUNE 2019 INCLUSION OF E. ALMOND (MUKKER) MEDICAL OFFICE, APN 012-390-021 343
2 1 3 4 5 6 7 8 910 11 1213 14 15 1716 18 19 ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JUNE 2019 INCLUSION OF SUBDIVISION 18-S-04, CVI GROUP 344
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MARCH 2020 INCLUSION OF DOWNTOWN RESIDENTIAL - VETERANS HOUSING PROJECT 345
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MARCH 2020 INCLUSION OF CAMARENA HEALTH - 720 E ALMOND AVE.
ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. MARCH 2020 INCLUSION OF 610 N E STREET ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JAN 2022 INCLUSION OF EZ TRIP GAS STA - APN 012-133-039 ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JAN 2022 INCLUSION OF CALIBER COLLISION - APN 010-193-010 ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JAN 2022 INCLUSION OF STARBUCKS - APN 003-194-012 ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JULY 2022 INCLUSION OF BELLAVA APARTMENTS ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JULY 2022 INCLUSION OF CAL PACIFIC SUPPLY ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JULY 2022 INCLUSION OF GROVE GARDEN APARTMENTS ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JULY 2022 INCLUSION OF MADERA INDUSTRIAL WAREHOUSE ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JULY 2022 INCLUSION OF SHERWOOD APARTMENTS ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. JUNE 2020 INCLUSION OF SUGAR PINE APARTMENT COMPLEX ASSESSMENT DIAGRAM INTO MADERA LANDSCAPE MAINTENANCE DISTRICT - ZONE 51 CITY OF MADERA, COUNTY OF MADERA, STATE OF CALIFORNIA CITY OF MADERA REV. OCT. 2023 INCLUSION OF 322 W 6TH STREET APARTMENT COMPLEX
REPORT TO CITY COUNCIL
Approved by:
_________________________________
Council Meeting of: June 19, 2024
Agenda Number: D-5
Keith Helmuth, City Engineer
Arnoldo Rodriguez, City Manager
SUBJECT:
Contract Award for R-10 Phase III, Olive and Knox Street Widening and Intersection Improvements from Olive Avenue to Neplus Way
RECOMMENDATION:
Adopt a Resolution approving the contract award for Olive and Knox Street Widening and Intersection Improvements from Olive Avenue to Neplus Way, City Project R-000010 Phase III, in the amount of $849,331.00 to Terra West Construction, Inc and a contingency of 10 percent of the contract amount.
SUMMARY:
This project is the third phase of the larger Olive Avenue widening project from Gateway Drive to Knox Street, City Project R-000010. Phase III supports the public right of way improvements adjacent to the future James Taubert Park (Park). On May 29, 2024, the City received two bids for the Olive and Knox Street Widening and Intersection Improvements Project from Olive Avenue to Neplus Way (Project). Terra West Construction, Inc, submitted the lowest, responsive bid. Funding for the project is included in the Fiscal Year (FY) 2023/24 Capital Projects Budget.
DISCUSSION:
With the Phase III project, Olive Avenue and Knox Street will be widened to their ultimate width and a traffic signal will be installed at the intersection. The Project includes the installation of sidewalk along the Olive Street and Knox Street frontages of the Park.
Previous phases of the Olive Avenue widening project included:
▪ Phase I - cleared the properties purchased by the City for the Project of pre-existing improvements.
▪ Phase II – ongoing - is a Rule 20B utility undergrounding project to clear the roadway of utility power poles and overhead wires in advance of the widening project. This portion of the Project is pending completion of the conversion of the electrical service to the UPRR signal cabinet.
The remaining portion of the Project, which is the widening of Olive Avenue from two to four lanes from Gateway Drive to Knox Street, a traffic signal at Roosevelt Avenue and a new UPRR road crossing and signals, has suffered the loss of two City project managers thus delaying necessary coordination with UPRR for the crossing improvements.
The “Advertisement For Bids” for the Phase III Project was noticed in the Madera Tribune Newspaper on April 24, 2024. The construction and bidding documents (specifications) were uploaded to Planetbids.com as well as advertised on the City of Madera (City) website. Planetbids is an online listing service for contractors accessible from the City’s website.
To determine the low bidder, bids were compared based on the Total Base Bid. The bids received are summarized by Total Base Bid in Table 1.
Table 1: Bid Overview
Bidder Total Base Bid
1. Terra West Construction, Inc $849,331.00
2. Witbro Inc. dba Seal Rite Paving & Grading $1,214,066.00 Engineer’s Opinion of Cost $782,815.00
Terra West Construction, Inc submitted the lowest, responsive, and responsible bid that meets the contract requirements.
FINANCIAL IMPACT:
There is no fiscal impact on the City’s General Fund. This Phase III project is included in the FY 2023/24 CIP and is primarily funded with RSTP Exchange Funds.
ALTERNATIVES:
The alternative to awarding the project is to reject all bids. Rebidding the project could result in higher bids and would result in delays in the widening of Olive Avenue and subsequently the James Taubert Park as well.
ATTACHMENTS:
1. Resolution approving Contract
a. Exhibit A - Contract
2. Project Map
Attachment 1
Resolution
RESOLUTION NO.24-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MADERA,
CALIFORNIA APPROVING THE CONTRACT AWARD FOR THE OLIVE AND
KNOX STREET WIDENING AND INTERSECTION IMPROVEMENTS, CITY PROJECT R-000010 PHASE III, AND AUTHORIZING CONSTRUCTION
CONTINGENCIES RELATING TO THE CONTRACT
WHEREAS, on April 24, 2024, the City of Madera (City) Engineering Department advertised a solicitation for construction bids for the Olive and Knox Street Widening and Intersection Improvements, Olive Avenue to Neplus Way, City Project No. R-000010 Phase III, hereinafter referred to as “the Project”; and
WHEREAS, two sealed bids were received on May 29, 2024, and opened by the City Engineer; and
WHEREAS, Terra West Construction, Inc was selected as the lowest responsive and responsible bidder; and
WHEREAS, funding for the Project is programmed in the Capital Improvement Projects (CIP) Budget for Fiscal Year 2023/24 under CIP Project R-000010; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MADERA HEREBY finds, orders and resolves as follows:
1. The above recitals are true and correct.
2. The City Council (Council) has reviewed and considered all the information presented including the report to Council from the Engineering Department.
3. The City Council finds that Terra West Construction, Inc., is the lowest qualified, responsible, and responsive bidder and does hereby accept the base bid of Terra West Construction, Inc.
4. The City Council awards the base bid to Terra West Construction, Inc., with the finding it is in the best interests of the City. The City Council approves an Agreement for contract for the Project, attached as Exhibit “A”, in the amount of $ 849,331.00 with Terra West Construction, Inc., and authorizes the City Manager to execute the same on behalf of the City. The City Manager is further authorized to make any nonmaterial, technical, and clerical edits and corrections to the Agreement, including performance and payment bonds completed after the award, subject to approval as to form by City Attorney.
5. Council authorizes Construction Contingencies of up to 10 percent as approved by the City Engineer.
6. This Resolution is effective immediately upon adoption. *******
Exhibit A
Contract Agreement
Attachment A
Advertisement for Bids
1 ADVERTISEMENT FOR BIDS
Sealed bids will be received at the office of the City Engineer of the City of Madera for the following:
“OLIVE AVENUE AND KNOX STREET WIDENING AND INTERSECTION IMPROVEMENTS OLIVE AVENUE TO NEPLUS WAY, CITY PROJECT NO. R-000010 Phase III” at 428 E. Yosemite Avenue, Madera, CA 93638, until 2:00 pm, on May 30, 2024 and then at said office publicly opened and read aloud.
There will be a non-mandatory pre-bid meeting on May 14, 2024 at City of Madera, Engineering Building Conference Room, 428 E. Yosemite Avenue at 2:00 p.m. Any prospective bidder may also attend the meeting by Zoom at
https://cityofmadera.zoom.us/j/83850577756?pwd=blG7bEN49tLFSM7sFsYXnWQuFiASbM.1 Meeting ID: 838 5057 7756, Passcode: 925791
On the same day and time. All bidders are invited to attend in person or by Zoom.
The work in general consists of widening and intersection improvements of Olive Avenue and Knox Street, to Arterial Street standards including: concrete curbs, gutters, sidewalk and ADA ramps. Street construction includes removal of existing pavements, grading of roadway subgrade, placing aggregate base, and asphalt concrete paving. Also included is the installation of a new traffic signal system including new electrical service pedestal and meter.
In accordance with the provisions of Section 3300 of the Public Contract, the general contractor for this project shall have a Class A license, a California State Contractor’s License issued in accordance with the provisions of the Contractor’s State License Law, California Business and Professions Code, Division 5, Chapter 9, as amended.
All contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the bidder and its subcontractor(s), of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the project.
Bid security in the amount of ten (10) percent of the amount of the bid, and in the form of a bid bond issued by an admitted surety insurer licensed by the California Department of Insurance, cash, cashier's check or certified check shall accompany the bids. Bid securities shall be made in favor of the City of Madera.
Plans and Specifications will be posted and can be downloaded from the City’s website at https://www.madera.gov/home/departments/engineering/cip/ by clicking on the link ‘City of Madera’s PlanetBids Vendor Portal’. Any printed hard copies of the plans, specifications, and all addenda shall be at the contractor’s expense. Bidders must be registered with planetbids.com in order to receive all bid documents, and addenda.
In accordance with the provisions of Division 2, Part 5, Section 22300 of the Public Contract Code of the State of California, securities may be substituted for non-federal monies withheld on this Project.
2 In accordance with the provisions of Section 1770 of the Labor Code, the Director of the Department of Industrial Relations of the State of California has determined the general prevailing rates of wages and employer payments for health and welfare, pension, vacation, travel time and subsistence pay as provided by Section 1773.8 apprenticeship or other training programs authorized by Section 3093, and similar purposes applicable to the work to be done.
These wage rates are on file with the City Engineer, City of Madera, and are incorporated herein by reference.
The City Council of the City of Madera reserves the right to reject any and all bids, and to waive any and all irregularities in any bid. The City shall not assume any liability or costs incurred by Bidders should the award of contract be canceled due to lack of financing.
BY ORDER OF THE CITY COUNCIL OF THE CITY OF MADERA.
ATTEST: /s/ Alicia Gonzales DATE: April 24, 2024
City Clerk
City of Madera
Attachment B
Information for Bidders
3 INFORMATION FOR BIDDERS
BIDS will be received by the City of Madera (herein called the "OWNER") at the office of the City Engineer until 2:00 p.m., on May 30, 2024 and then at said office publicly opened and read aloud. The official bid stamp clock will be located at the Engineering Building at the above referenced address. The back-up clock is located above the front counter in the Engineering Building, should the official bid stamp clock not work.
The work in general consists of widening and intersection improvements of Olive Avenue and Knox Street, to Arterial Street standards including: concrete curbs, gutters, sidewalk and ADA ramps. Street construction includes removal of existing pavements, grading of roadway subgrade, placing aggregate base, and asphalt concrete paving. Also included is the installation of a new traffic signal system including new electrical service pedestal and meter.
Each BID must be submitted with all documents listed on the Bidder's Checklist in a sealed envelope, addressed to the OWNER at Engineering Building, located at, 428 East Yosemite Avenue, Madera, CA 93638. Each sealed envelope containing a BID must be plainly marked on the outside as bid for “OLIVE AVENUE AND KNOX STREET WIDENING AND INTERSECTION IMPROVEMENTS, CITY PROJECT NO. R-000010 Phase III”, and the envelope should bear on the outside, the name of the BIDDER, his address, his Contractor's license number, Registration number with Department of Industrial Relations and a statement "DO NOT OPEN UNTIL THE TIME OF BID OPENING". If forwarded by mail, the sealed envelope containing the BID must be enclosed in another envelope addressed to the OWNER at Engineering Building, 428 E. Yosemite Ave., Madera, CA 93638 and shall be clearly labeled as instructed for the enclosed BID.
All BIDS must be made on the required BID PROPOSAL forms. All blank spaces for BID prices must be filled in, in ink or typewritten, and the BID PROPOSAL forms must be fully completed and executed when submitted. Only one copy of the BID PROPOSAL form is required.
Contractor who has employees who will work on a City of Madera project is required to comply with all of the provisions of the Federal Immigration Reform and Control Act of 1986 (S.B. 1200; H.REP 99-1000). This requirement includes compliance with all of the employee documentation provisions. Furthermore, the Contractor will make any employee documentation required to comply with the Act immediately available to the City upon its request for each individual employee working on a City of Madera project.
A pre-bid meeting is scheduled for May 14, 2024 at 2:00 pm at City of Madera Engineering Building Conference Room, 428 E. Yosemite Avenue, Madera, CA 93638. All bidders are invited to attend and will have the opportunity to visit the project site at the end of the meeting. Any prospective bidder may also attend the meeting by Zoom at https://cityofmadera.zoom.us/j/83850577756?pwd=blG7bEN49tLFSM7sFsYXnWQuFiASbM.1 Meeting ID: 838 5057 7756, Passcode: 925791
On the same day and time. All bidders are invited to attend in person or by Zoom.
The ENGINEER is the City Engineer of the City of Madera and the telephone number is (559) 661-5418.
4 The OWNER may waive any informalities or minor defects or reject any and all BIDS.
Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Should there be reasons why the Contract cannot be awarded within the specified period the time may be extended by mutual agreement between the OWNER and the BIDDER.
Any one or more of the following causes may be considered as sufficient for disqualification of a BIDDER and rejection of his proposal or proposals:
a. More than one proposal for the same work from an individual, partnership or corporation. b. Evidence of collusion among BIDDERS. Participants in such collusion will receive no recognition as BIDDERS for any future work of the OWNER until such participant hall have been reinstated as a qualified BIDDER.
c. Lack of competency and adequate machinery, plant or other equipment, as may be revealed by financial statement if required.
d. For unsatisfactory performance record as shown by past work for the OWNER, judged from the standpoint of workmanship and progress.
e. Prior commitments or obligations, which in the judgment of the OWNER might hinder or prevent the prompt completion of the work.
f. Failure to pay or satisfactorily settle all payments due for labor or materials on former contracts in force with the City of Madera at the time of letting the BID. g. Failure to comply with any qualifications regulation of the OWNER. h. Omission of proposal guaranty.
A BIDDER who claims a mistake in his BID must follow the procedures in Public Contract Code Division 2, Part 1, Chapter 5, et seq. in seeking relief of his BID.
BIDDERS must satisfy themselves as to the accuracy of the estimated quantities in the Bid Schedule by examination of the site and a review of the DRAWINGS and SPECIFICATIONS including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or the nature of the WORK to be done.
The CONTRACT DOCUMENTS contain the provisions required for the construction of the PROJECT. Information obtained from an officer, agent, or employee of the OWNER, or any person shall not affect the risks, or obligations assumed by the CONTRACTOR or relieve the CONTRACTOR from fulfilling any of the conditions of the Contract.
Each BID must be accompanied by a Bid Bond payable to the OWNER for ten percent of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the bonds of all except the three lowest responsible BIDDERS. When the Agreement is executed, the bonds of the two remaining unsuccessful BIDDERS will be returned. The Bid Bond of the successful BIDDER will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified or cashier's check may be used in lieu of a Bid Bond.
A Performance Bond and a Payment Bond, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate bonding company licensed to transact such business in the State of California, with a current A.M. Best’s rating of not less than A: VII, will be required 5 for the faithful performance of the Contract, or as approved by the City Attorney. The Payment Bond and Performance Bond must be issued by an admitted surety holding a certificate of authority to transact surety insurance in California issued by the Insurance Commissioner.
Attorneys-in-Fact who sign Bid Bonds or Payment Bonds and Performance Bonds must file with each bond a certified and effective dated copy of their power of attorney.
The party to whom the Contract is awarded will be required to execute the Agreement, obtain the Performance Bond and Payment Bond, and provide proof of carriage of insurance on the specified format within ten (10) calendar days from the date when the NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accompanied by the necessary Agreement and Bond forms. In case of failure of the BIDDER to execute the Agreement, the OWNER may, at his option, consider the BIDDER in default, in which case the Bid Bond accompanying the proposal shall become the property of the OWNER.
The party to whom the Contract is awarded will be required to meet the insurance requirements as specified in the Contract Documents and provide proof of carriage of insurance on the specified format prior to execution of the Agreement.
The OWNER, within fifteen (15) days of receipt of acceptable Insurance Forms, Performance Bond, Payment Bond and Agreement signed by the party to whom the Agreement was awarded, shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the OWNER not execute the Agreement within such period, the BIDDER may, by written notice, withdraw his signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the OWNER.
The NOTICE TO PROCEED shall be issued within ten (10) days of the execution of the Agreement by the OWNER. Should there be reasons why the NOTICE TO PROCEED cannot be issued within such period; the time may be extended by mutual agreement between the OWNER and CONTRACTOR. If the NOTICE TO PROCEED has not been issued within the 10-day period or within the period mutually agreed upon, the CONTRACTOR may terminate the Agreement without further liability on the part of either party.
Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of any BIDDER to do any of the foregoing shall not relieve any BIDDER from any obligation with respect to his BID.
Pursuant to the provisions of the Public Contract Code of the State of California, each BIDDER shall set forth in his proposal the name and location of the place of business of each subcontractor who will perform work or labor or render service to the CONTRACTOR in or about the construction of the WORK in an amount in excess of 1/2 of 1% of the CONTRACTOR’S total BID, or, in the case of BIDS or offers for the construction of streets or highways, including bridges, in excess of one-half of one percent of the prime CONTRACTOR’S total BID or ten thousand dollars ($10,000), whichever is greater, and the portion of the WORK which will be done by each subcontractor.
The OWNER may make such investigations as it deems necessary to determine the ability of the BIDDER to perform the WORK, and the BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the 6 Agreement and to complete the WORK contemplated therein. The CONTRACT will not be awarded to anyone on the debarred list of Contractors.
Bids will be compared on the basis of the TOTAL BID. Award will be made to the lowest responsible BIDDER.
A conditional or qualified BID will not be accepted.
All applicable laws, ordinances, and the rule and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the Contract throughout.
Prior to beginning any work, the CONTRACTOR shall secure a City of Madera Business License at his own cost and expense.
Each Contractor and Subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed by him in connection with the public work. Such records shall be certified and available for inspection at all reasonable hours at the principal office of the Contractor as required by Labor Code Section 1776.
The Contractor shall forfeit to the City as a penalty $50.00 per day for each workman paid less than the rate set forth in the wage determination of the Director of Industrial Relations.
The Contractor shall keep an accurate record of all personnel employed under the various classifications listing the name, classification, and hourly rate of such personnel, which record shall be made available for inspection by the owner.
At the time of award, and in accordance with the provisions of Section 3300 of the Public Contract Code, the general contractor for this project shall have a Class 'A' California State Contractor’s License issued in accordance with the provisions of the Contractors State License Law, California Business and Professions Code, Division 5, Chapter 9, as amended.
No bid submitted will be invalidated by the failure of the bidder to be licensed in accordance with the laws of the State. The Contract will not be awarded unless the CONTRACTOR has a valid license in the appropriate classification for the work performed.
Failure of the bidder to obtain the required licensing for an award of Contract shall constitute a failure to execute the Contract and shall result in the forfeiture of the security of the bidder.
Department of Industrial Relations Annual Registration:
a. Pursuant to Labor Code Sections 1772 and 1771(b), all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. b. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations. c. Pursuant to Labor Code Section 1725.5 - no Contractor or subcontractor may work on a public works project unless registered with the Department of Industrial Relations. d. Pursuant to Labor Code Section 1771.4(a)(1) – all contractors and subcontractors must furnish Certified Payroll Records (CPRs) weekly to the Agency they are contracted with and file electronic certified payroll records weekly directly to the Labor Commissioner, Division of Labor Standards Enforcement (DLSE).
7 e. Pursuant to Labor Code Section 1776(c) – the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or forms that contain the same information as the forms provided by the division.
f. Pursuant to Labor Code 1771.5 - the awarding agency shall withhold contract payments when payroll records are delinquent or inadequate.
g. Pursuant to Title 8 California Code of Regulations Section 16451(d)/Labor Code Section 1771.4(a)(2) - the Contractor must post job Posters and Notices as required by Department of Industrial Relations and as required by other State agencies. h. Pursuant to Labor Code Section 1773.3 - the Public Agency must file a PWC 100 Form with the DIR within 5 days of the award of a public works project. PWC Form 100 will be amended to reflect changes in contract time. The DIR will also be notified within 5 days of the completion of project.
Contact Haley Christensen, City of Madera, Labor Compliance Officer, at (559) 661- 5418 regarding labor compliance, certified payroll submittals and monitoring.
In bidding on this Project, it shall be the Bidders sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law(s) in the Project bid.
Pursuant to Section 1777.1 of the Labor Code, the Labor Commissioner publishes and distributes a list of contractors ineligible to perform work as a subcontractor on a public works project. This list of debarred contractors is available from the Department of Industrial Relations at www.dir.ca.gov/DLSE/Debar.html
Questions and Requests for Information/Clarification
No verbal requests or requests made in any other format will be accepted. Any questions about the RFP must be submitted electronically and individually (not in a paragraph format nor combined in a single submission) through the City’s electronic bid management system (PlanetBids) at https://pbsystem.planetbids.com/portal/54016/portal-home under the “Q&A” tab. All posted questions will be answered in writing and conveyed via written addenda to all Proposers via posting through the City’s electronic bid management system (PlanetBids) at https://pbsystem.planetbids.com/portal/54016/portal-home under the “Addenda/Emails” or the “Q&A” ta
Attachment C
Bid Proposal
BIDDER'S NAME: __________________________
(Submit with Bid Proposal)
9 BID PROPOSAL
BIDDER’S CHECKLIST
OLIVE AVENUE AND KNOX STREET
WIDENING AND INTERSECTION IMPROVEMENTS
OLIVE AVENUE TO NEPLUS WAY
CITY PROJECT NO. R-000010 Phase III
SUBMIT THIS BIDDER’S CHECKLIST WITH YOUR BID DOCUMENTS. Bidders shall complete and submit all documents marked with an “X” in the “REQUIRED” column for bids to be considered responsive.
REQUIRED
[X] 1. BID PROPOSAL FORM (including Bidder’s Checklist and Bid Proposal Form) [X] 2. BID SCHEDULE
[X] 3. SUBCONTRACTOR LISTING (In excess of 1/2 of 1%)
[X] 4. BID DEPOSIT attached to front of Proposal in the form of:
[ ] Certified Check [ ] Bidder’s Bond (Page 15 )
[ ] Cashier’s Check [ ] Irrevocable Letter of Credit
[ ] Certificate of Deposit
[X] 5. CERTIFICATION (Comptroller General's List)
[X] 6. NONCOLLUSION AFFIDAVIT
[X] 7. PUBLIC CONTRACT CODE
[X] 8. DEBARMENT AND SUSPENSION CERTIFICATION
[X] 9. EQUAL OPPORTUNITY CERTIFICATION
[X] 10. ADDENDA – Signature page of all Addenda issued
If one of the three lowest bidders, submit no later than 4:00 p.m. on the 3rd business day after bid opening:
[X] 11. LETTER FROM BIDDER THAT BIDDER WILL PERFORM NOT LESS THAN 30% OF THE TOTAL NET BID AMOUNT (ORIGINAL CONTRACT PRICE), excluding specialty items designated by the City on the bid proposal, Page 15, to be submitted within three working days from the date of the bid opening.
SUBMITTED BY:
Name of Company ______________________ Contact Name __________________________ Address _________________________ City __________________ State _____ Zip ________ Phone No._________________________ Fax No.____________________ Documents required on the checklist but not included in the bid package may render your bid non-responsive and ineligible for award. Bids received by the City of Madera by the scheduled bid opening time will be opened and publicly read but are subject to verification that all the required documents have been submitted.
BIDDER'S NAME: __________________________
(Submit with Bid Proposal)
10 BID PROPOSAL FORM
OLIVE AVENUE AND KNOX STREET
WIDENING AND INTERSECTION IMPROVEMENTS
OLIVE AVENUE TO NEPLUS WAY
CITY PROJECT NO. R-000010 Phase III
Proposal of ____________________________ (hereinafter called “BIDDER”), organized and existing under the laws of the State of _________________, doing business as (an individual), or (a partnership), or (a corporation), to the City of Madera (hereinafter called “OWNER”):
In compliance with your advertisement for Bids, BIDDER hereby proposes to perform all work required for “WIDENING AND INTERSECTION IMPROVEMENTS – OLIVE AVENUE AND KNOX STREET, PHASE-3, CITY PROJECT NO. R-000010 (Ph. 3)” in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below.
By submission of this BID, each BIDDER certifies, and in the case of a joint BID, each party thereto certifies as to his own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.
BIDDER hereby agrees to commence work under this Contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT in One Hundred Twenty (120) Calendar Days
BIDDER further agrees to pay as liquidated damages, the sum of $3,600 for each consecutive calendar day thereafter, as provided in Section 1-17 of the General Conditions.
BIDDER acknowledges receipt of the following ADDENDA:
No. ______, dated ____________________, 2024
No. ______, dated ____________________, 2024
No. ______, dated ____________________, 2024
The undersigned, as BIDDER, declares that the only persons, or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any other person, firm or corporation; that the BIDDER has carefully examined the location of the proposed work, the annexed proposed form of contract, and the plan therein referred to; and he proposes and agrees if this proposal is accepted, that the BIDDER will contract with the City of Madera to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the contract in the manner and time therein prescribed and according to the requirements of the OWNER as therein set forth, and that he will take in full payment therefor the following prices, to wit:
Attachment D
Bid Bond
BIDDER'S NAME: __________________________
(Submit with Bid Proposal)
14 BID BOND
KNOWN ALL MEN BY THESE PRESENT, that we, the undersigned, ___________________________________ as Principal, and ___________________________ as Surety, are hereby held and firmly bound unto _____________________________ as Owner in the penal sum of ____________________________ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.
Signed, this _____ day of ____________________, 2024. The condition of the above obligation is such that whereas the Principal has submitted to _____________________________ a certain bid, attached hereto and hereby made a part hereof to enter into a contract in writing, for the
OLIVE AVENUE AND KNOX STREET
WIDENING AND INTERSECTION IMPROVEMENTS
OLIVE AVENUE TO NEPLUS WAY
CITY PROJECT NO. R-000010 Phase III
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract attached hereto (properly completed in accordance with said Bid) and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid.
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. (L.S.) By_____________________________________
Principal
Surety
By:
(Seal and Notarial Acknowledge of Surety)
Attachment E
Agreement
20 AGREEMENT
THIS AGREEMENT, made this day of , 2024, between the City of Madera, hereinafter called “OWNER”, and , doing business as (an individual), or (a partnership), or (a corporation), hereinafter called “CONTRACTOR”.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The CONTRACTOR shall commence and complete all WORK required for the “WIDENING AND INTERSECTION IMPROVEMENTS – OLIVE AVENUE AND KNOX STREET, PHASE-3, CITY PROJECT NO. R-000010 (Ph. 3)”
2. The CONTRACTOR shall furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the WORK described herein.
3. The CONTRACTOR shall commence the WORK required by the CONTRACT DOCUMENTS within 10 calendar days after the date of the NOTICE TO PROCEED and will complete the same within the time period set forth in the CONTRACT DOCUMENTS. The CONTRACTOR shall submit a Payment Bond and Performance Bond in the amount of $ , each and Insurance Certificates as specified in the CONTRACT DOCUMENTS prior to commencing any WORK.
4. The CONTRACTOR agrees to perform all of the WORK described in the DOCUMENTS for the unit and lump sum prices set forth in the Bid Schedule.
5. The term “CONTRACT DOCUMENTS” means and includes the following:
(A) Advertisement for Bids
(B) Information for Bidders
(C) Bid Proposal
(D) Bid Bond
(E) Agreement
(F) Payment Bond
(G) Performance Bond
(H) Insurance Requirements for Contractors
(I) General Conditions
(J) Special Conditions
(K) City of Madera Standard Specifications and Drawings (L) State Standard Plans and Specifications
(M) PLANS and SPECIFICATIONS prepared or issued by CITY OF MADERA, entitled “OLIVE AVENUE AND KNOX STREET WIDENING AND INTERSECTION IMPROVEMENTS – OLIVE AVENUE TO NEPLUS
WAY, CITY PROJECT NO. R-000010 PHASE III” - APRIL 2024
Addenda Nos. , dated
Addenda Nos. , dated
Addenda Nos. , dated
6. In the event the CONTRACTOR does not complete the WORK within the time limit specified herein or within such further time as authorized, the CONTRACTOR shall pay to the OWNER liquidated damages in the amount of Thirty Six Hundred Dollars ($3,600) per 21 day for each and every calendar day delay in finishing the WORK beyond the completion date so specified.
7. The OWNER will pay to the CONTRACTOR in the manner and at such times as set forth in the General Conditions such amounts as required by the CONTRACT DOCUMENTS. For any moneys earned by the CONTRACTOR and withheld by the OWNER to ensure the performance of the Contract, the CONTRACTOR may, at his request and expense, substitute securities equivalent to the amount withheld in the form and manner and subject to the conditions provided in Division 2, Part 5, Section 22300 of the Public Contract Code of the State of California.
8. In the event of a dispute between the OWNER and the CONTRACTOR as to an interpretation of any of the specifications or as to the quality or sufficiency of material or workmanship, the decision of the OWNER shall for the time being prevail and the CONTRACTOR, without delaying the job, shall proceed as directed by the OWNER without prejudice to a final determination by negotiation, arbitration by mutual consent or litigation, and should the CONTRACTOR be finally determined to be either wholly or partially correct, the OWNER shall reimburse him for any added costs he may have incurred by reason of work done or material supplied beyond the terms of the contract as a result of complying with the OWNER’S directions as aforesaid. In the event the CONTRACTOR shall neglect to prosecute the work properly or fail to perform any provisions of the CONTRACT, the OWNER, after three days written notice to the CONTRACTOR, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due to the CONTRACTOR, subject to final settlement between the parties as in this paragraph herein above provided.
9. Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical conditions, marital status, or sex of such persons except as provided in Section 12940 of the Government Code, and every contractor for public works violating this section is subject to all the penalties imposed for by violation of this chapter”.
10. In accordance with the provisions of Article 5, Chapter l, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part l, Division 4 (commencing with Section 3700) of the Labor Code of the State of California, the CONTRACTOR is required to secure the payment of compensation to his employees and shall for that purpose obtain and keep in effect adequate Worker’s Compensation Insurance.
The undersigned CONTRACTOR is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against Liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the WORK of this Agreement.
11. The CONTRACTOR shall comply with Part 7, Chapter l, Article 2, Section 1775 of the Labor Code of the State of California. The CONTRACTOR shall, as a penalty to the OWNER, forfeit fifty dollars ($50.00) for each calendar day, or portion thereof, for each workman paid less than the prevailing rates for such work or craft in which such workman is employed for any public work done under the Contract by him or by any SUBCONTRACTOR under him. The difference between such prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than a prevailing wage rate, shall be paid to each workman by the CONTRACTOR.
22 12. The CONTRACTOR shall comply with Part 7, Chapter l, Article 2, Section 1776 of the Labor Code of the State of California. The CONTRACTOR shall keep and require that all SUBCONTRACTORS keep accurate payroll records showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice worker or other employee employed by him in connection with public work. Such payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of the CONTRACTOR by the OWNER, its officers and agents and to the representatives of the Division of Labor Law Enforcement of the State Department of Industrial Relations. In the event of non-compliance with the requirements of Section 1776, the CONTRACTOR shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects the CONTRACTOR must comply. Should non-compliance still be evident after the ten (10) day period, the CONTRACTOR shall, as a penalty to the OWNER forfeit twenty-five dollars ($25.00) for each calendar day, or portion thereof, for each worker until strict compliance is effectuated.
Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due.
13. Attention is directed to the provisions in Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the CONTRACTOR or any SUBCONTRACTOR under him. It is the CONTRACTOR’S responsibility to ensure compliance by both itself and all SUBCONTRACTORS.
Section 1777.5 provides, in part, as follows:
The CONTRACTOR or SUBCONTRACTOR, if he is covered by this section, upon the issuance of the approval certificate, or if he has been previously approved in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeyman stipulated in the apprenticeship standards. Upon proper showing by the CONTRACTOR that he employs apprentices in the craft or trade in the State on all of his/her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by a journeyman, or in the land surveyor classification, one apprentice for each five journeyman, the Division of Apprenticeship Standards may grant a certification exempting the CONTRACTOR from the one (1) to five (5) hourly ratio as set forth in this section. This section shall not apply to contracts of general CONTRACTORS or to contracts of specialty contractors not bidding for work through a general or prime CONTRACTOR, when the contracts of general CONTRACTORS, or those specialty CONTRACTORS involve less than thirty thousand dollars ($30,000). Any work performed by a journeyman in excess of eight hours per day or forty (40) hours per week shall not be used to calculate the hourly ratio required by this section.
Apprenticeable craft or trade, as used in this section, shall mean a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the Apprenticeship Council. The joint apprenticeship committee shall have the discretion to grant a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting a CONTRACTOR from the 1 to 5 ratio set forth in this section when it finds that any one of the following conditions is met:
(a) In the event unemployment for the previous three month period in such area exceeds an average of 15 percent, or
(b) In the event the number of apprentices in training in such area exceeds a ratio of 1 to 5, or
(c) If there is a showing that the apprenticeable craft or trade is replacing at least onethirtieth of its journeymen annually through apprenticeship training, either (1) on a 23 statewide basis, or (2) on a local basis, or
(d) If assignment of an apprentice to any work performed under a public works contract would create a condition which should jeopardize his life or the life, safety, or property of fellow employees, or the public at large or if the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
When such exemptions are granted to an organization which represents CONTRACTORS in a specific trade from the 1 to 5 ratio on a local or statewide basis the member CONTRACTORS will not be required to submit individual applications for approval to local joint apprenticeship committees, provided they are already covered by the local apprenticeship standards.
The CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in apprenticeable trade on such contracts and if other CONTRACTORS on the public work site are making such contributions. The CONTRACTOR, and any SUBCONTRACTOR under him, shall comply with the requirements of Sections 1777.5 and 1777.6 of the Labor Code in the employment of apprentices. Information relative to number of apprentices, identifications, wages, hours of employment and standards of working conditions shall be obtained from the Division of Apprenticeship Standards. Consult the white pages of your telephone directory under California, State of, Industrial Relations, Apprenticeship Standards, for the telephone number and address of the nearest office. Willful failure by the CONTRACTOR to comply with the provisions of Sections 1777.5 will subject the CONTRACTOR to the penalties set forth in Section 1777.7 of the Labor Code.
14. Pursuant to California Labor Code Section 1813, eight hours in any one calendar day and forty (40) hours in any calendar week shall be the maximum hours any workman is required or permitted to work, except in cases of extraordinary emergency caused by fires, flood, or danger to life and property. The CONTRACTOR doing the work, or his duly authorized agent, shall file with OWNER a report, verified by his oath, setting forth the nature of the said emergency, which report shall contain the name of said worker and the hours worked by him on the said day, and the CONTRACTOR and each SUBCONTRACTOR shall also keep an accurate record showing the names and actual hours worked of all workers employed by him in connection with the work contemplated by this Agreement, which record shall be open at all reasonable hours to the inspection of the OWNER, or its officer or agents and to the Chief of all Division of Labor Statistics and Law Enforcement of the Department of Industrial Relations, his deputies or agents; and it is hereby further agreed that said CONTRACTOR shall forfeit as a penalty to the OWNER the sum of Twenty-Five Dollars ($25.00) for each laborer, workman or any SUBCONTRACTOR under him for each calendar day during which such laborer, workman or mechanic is required or permitted to labor more than eight (8) hours in violation of this stipulation.
Overtime and shift work may be established as a regular procedure by the CONTRACTOR with reasonable notice and written permission of the OWNER. No work other than overtime and shift work established as a regular procedure shall be performed between the hours of 6:00 P.M. and 7:00 A.M. nor on Saturdays, Sundays or holidays except such work as is necessary for the proper care and protection of the work already performed or in case of an emergency.
CONTRACTOR agrees to pay the costs of overtime inspection except those occurring as a result of overtime and shift work established as a regular procedure. Overtime inspection shall include inspection required during holidays, Saturdays, Sundays and weekdays. 24 Costs of overtime inspection will cover engineering, inspection, general supervision and overhead expenses which are directly chargeable to the overtime work. CONTRACTOR agrees that OWNER shall deduct such charges from payments due the CONTRACTOR.
15. The CONTRACTOR shall comply with Division 2, Chapter 4, Part 1 of the Public Contract Code relating to subletting and subcontracting, specifically included but not limited to Sections 4104, 4106, and 4110, which by this reference are incorporated into this Agreement as though fully set forth herein.
16. The CONTRACTOR and the OWNER agree that changes in this Agreement or in the work to be done under this Agreement shall become effective only when written in the form of a supplemental agreement or change order and approved and signed by the OWNER and the CONTRACTOR. It is specifically agreed that the OWNER shall have the right to request any alterations, deviations, reductions or additions to the contract or the plans and specifications or any of them, and the amount of the cost thereof shall be added to or deducted from the amount of the contract price aforesaid by fair and reasonable valuations thereof.
This contract shall be held to be completed when the work is finished in accordance with the original plans and specifications as amended by such changes. No such change or modification shall release or exonerate any surety upon any guaranty or bond given in connection with this contract.
17. Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees, and volunteers from and against all liability, loss, damage, expense, and cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Contractor's negligence, recklessness, or willful misconduct in the performance of work hereunder, or its failure to comply with any of its obligations contained in this AGREEMENT, except such loss or damage caused by the sole active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both City and Contractor, or should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation, reasonable legal counsel fees, expert fees, and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless, or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
Contractor obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this agreement, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.
Contractor agrees to obtain or cause to be obtained executed defense and indemnity agreements with provisions identical to those set forth in this Section from each and every Subcontractor and Subconsultant, of every Tier. In the event the Contractor fails to do so, 25 Contractor agrees to be fully responsible to provide such defense and indemnification according to the terms of this Section.
18. Contractor must comply with the insurance requirements as described in the section “INSURANCE REQUIREMENTS FOR CONTRACTOR”, pages 35-37 of the Contract Documents.
19. Amendments- Any changes to this Agreement requested by either City or [Name of Successful Bidder]. may only be effected if mutually agreed upon in writing by duly authorized representatives of the parties hereto. This Agreement shall not be modified or amended or any rights of a party to it waived except by such writing.
20. Termination.
A. This Agreement may be terminated at any time by either party upon fifteen (15) calendar days written notice. In the event the Agreement is terminated by either party, [Name of Successful Bidder] shall be compensated for services performed to the date of termination based upon the compensation rates and subject to the maximum amounts payable agreed to together with such additional services performed after termination which are authorized in writing by the City representative to wind up the work performed to date of termination.
B. City may immediately suspend or terminate this Agreement in whole or in part by written notice where, if in the determination of City, there is:
1. An illegal use of funds by [Name of Successful Bidder];
2. A failure by [Name of Successful Bidder]to comply with any material term of this Agreement;
3. A substantially incorrect or incomplete report submitted by [Name of Successful Bidder] to City.
In no event shall any payment by City or acceptance by [Name of Successful Bidder] constitute a waiver by such party of any breach of this Agreement or any default which may then exist on the part of either party. Neither shall such payment impair or prejudice any remedy available to either party with respect to such breach or default. City shall have the right to demand of [Name of Successful Bidder] the repayment to City of any funds disbursed to [Name of Successful Bidder] under this Agreement which, as determined by the appropriate court or arbitrator, were not expended in accordance with the terms of this Agreement.
Notice of termination shall be mailed to the City:
City of Madera
Engineering Department
428 E. Yosemite Ave.
Madera, Ca 93638
To the Contractor [Name of Successful Bidder]
Notices. All notices and communications from the [Name of Successful Bidder] shall be to City's designated Project Manager or Principal-In-Charge. Verbal communications shall be confirmed in writing. All written notices shall be provided and addressed as soon as possible, but not later than thirty (30) days after termination.
21. Compliance With Laws- City shall comply with all Federal, State and local laws, ordinances, regulations and provisions applicable in the performance of City’s services.
Wherever reference is made in this Agreement to standards or codes in accordance with which work is to be performed or tested, the edition or revision of the standards or codes current on the effective date of this Agreement shall apply, unless otherwise expressly stated.
22. Attorneys’ Fees/Venue- In the event that any action is brought to enforce the terms of this Agreement, the party found by the court to be in default agrees to pay reasonable attorneys’ fees to the successful party in an amount to be fixed by the Court. The venue for any 26 claim being brought for breach of this Agreement shall be in Madera County or as appropriate in the U.S. District Court for the Eastern District of California, located in the City of Madera.
23. Governing Law- The laws of the State of California shall govern the rights and obligations of the parties under the Agreement, including the interpretation of the Agreement. If any part of the Agreement is adjudged to be invalid or unenforceable, such invalidity shall not affect the full force and effect of the remainder of the Agreement.
24. City’s Authority- Each individual executing or attesting to this Agreement on behalf of the City hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with a duly adopted resolution of the corporation’s articles of incorporation or charter and bylaws; (ii) that this Agreement is binding upon such corporation; and (iii) that Contractor is a duly organized and legally existing municipal corporation in good standing in the State of California.
25. Contractor’s Legal Authority - Each individual executing or attesting this Agreement on behalf of [Name of Successful Bidder] hereby covenants and represents: (i) that he or she is duly authorized to execute or attest and deliver this Agreement on behalf of such corporation in accordance with such corporation’s articles of incorporation or charter and by-laws; (ii) that this Agreement is binding upon such corporation; and (iii) that [Name of Successful Bidder] is a duly organized and legally existing corporation in good standing in the State of California.
26. Remedies for Default. Failure by a party to perform any term, condition or covenant required of the party under this Agreement shall constitute a “default” of the offending party under this Agreement. In the event that a default remains uncured for more than ten (10) days following receipt of written notice of default from the other party, a "breach" shall be deemed to have occurred. Any failure or delay by a party in asserting any of its rights and remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default.
27. Independent Contractor. In performance of the work, duties, and obligations assumed by the Contractor under this Agreement, it is mutually understood and agreed that the City, including any and all of City’s officers, agents and employees will, at all times, be acting and performing as an independent contractor, and shall act in an independent capacity and not as an officer, agent, servant, employee, joint venturer, partner, or associate of City.
Furthermore, City shall have no right to control or supervise or direct the manner or method by which City shall perform its work and functions. The City shall comply with all applicable provisions of law and the rules and regulations, if any, of governmental authorities having jurisdiction over the subject matter hereof.
Because of its status as an independent contractor, City shall have absolutely no right to employment rights and benefits available to City employees. City shall be solely liable and responsible for providing to, or on behalf of, its employees all legally required employee benefits. In addition, City shall be solely responsible and hold City harmless from all matters relating to payment of City’s employees, including compliance with Social Security, withholding and all other regulations governing such matters. It is acknowledged that during the term of this Agreement, City may be providing services to others unrelated to City or to this Agreement.
28.Sole Agreement- This instrument constitutes the sole and only Agreement between City and [Name of Successful Bidder] in connection to the Project and correctly sets forth the obligations of the City and [Name of Successful Bidder] to each other as of its date. Any Agreements or representations in connection with the Project, not expressly set forth in this instrument are null and void.
27 29. Assignment-Neither the [Name of Successful Bidder] nor City will assign its interest in this Agreement without the written consent of the other.
30. During the performance of this agreement, the Contractor assures that no otherwise qualified person shall be excluded from participation or employment, denied program benefits, or be subjected to discrimination based on race, color, national origin, sex, age, or handicap, under any program or activity funded by this contract, as required by Title VI of the Civil Rights Act of 1964, Title I of the Housing and Community Development Act of 1974, as amended, and the Age Discrimination Act of 1975, and all implementing regulations.
31. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.
IN WITNESS WHEREOF the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in THREE copies, each of which shall be deemed an original on the date first above written.
City of Madera
Herein Called OWNER
By:
Santos Garcia, Mayor
APPROVE AS TO FORM:
Shannon L. Chaffin, City Attorney
ATTEST:
Alicia Gonzales, City Clerk
BY:
Herein Called CONTRACTOR
BY:
Federal Tax I.D. No.
Contractor License Number
28 DIR Registration Number
NOTE: This Notary Acknowledgment on the following page is required for verification of Contractor’s signature.
29 Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California )
County of ______________ )
On ______________,2024 before me, ______________________________________ (insert name and title of officer)
Personally appeared __________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature ___________________________________ (Seal)
Attachment F
Payment Bond
30 PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
a , hereinafter called Principal,
(Corporation, Partnership or Individual)
(Name of Surety)
(Address of Surety)
hereinafter call Surety, are held and firmly bound unto City of Madera
(Name of Owner)
428 East Yosemite Avenue, Madera CA 93638
(Address of Owner)
hereinafter called OWNER, in the penal sum of _________________________________________ Dollars, ($ ) in lawful money of the United States, for the payment of which sum well and truly made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents, and also by the provisions of Part 2, Title 14, Chapter 2 of the California Code of Civil Procedure (Section 995.010, et seq.) and of Section 3247, et seq. of the California Civil Code.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the Owner, dated the day of , 2024 a copy of which is hereto attached and made a part hereof for the construction of:
“WIDENING AND INTERSECTION IMPROVEMENTS – OLIVE AVENUE AND KNOX STREET PHASE-3, CITY PROJECT NO. R-000010 (Ph. 3)”
NOW, THEREFORE, if the Principal and all subcontractors shall promptly make payment to all mechanics, material men, contractors, subcontractors, lessors of equipment, artisans, architects, registered engineers, licensed land surveyors, machinists, builders, teamsters and laymen and all persons and laborers of every class performing labor upon or bestowing skill or necessary services on or furnishing materials or leasing equipment to be used or consumed in or furnishing appliances, teams or power contributing to the work described in the above mentioned contract, and to any other persons named in Section 3181 of the California Civil Code, and of amounts due under the Employment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld and paid over the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to Section 13020 of the Unemployment Insurance code, with respect to such work and labor, then this obligation shall be null and void: otherwise it shall remain in full force and effect.
PROVIDED FURTHER, that this obligation shall inure to the benefit of all persons named in Section 3181 of the California Civil code, and all such claimants and their assigns shall have a right of action in any suit brought upon this bond.
31 PROVIDED FURTHER, that no suit, action or other proceeding to recover on this bond shall be maintained unless commenced within six (6) months from the completion of the work described in the above mentioned contract, as “completion” is defined in Section 3086 of the California Civil Code.
PROVIDED FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract of accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.
PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in THREE counterparts, each one of which shall be deemed an original, this the ________ day of ________, 2024.
ATTEST:
Principal
BY: _________________________________(s)
(Principal) Secretary
(Seal)
(Witness as to Principal) (Address)
ATTEST:
(Surety) Secretary (Surety)
(SEAL)
BY:
Witness as to Surety Attorney in Fact
(Address) (Address)
NOTE: Date of Bond must not be prior to date of Contract. If Contractor is Partnership, all partners should execute Bond.
Attachment G
Performance Bond
32 PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
a , hereinafter called Principal,
(Corporation, Partnership or Individual)
(Name of Surety)
(Address of Surety)
hereinafter call Surety, are held and firmly bound unto City of Madera
(Name of Owner)
428 East Yosemite Avenue, Madera, CA 93638
(Address of Owner)
hereinafter called OWNER, in the penal sum of Dollars, ($ ) in lawful money of the United States, for the payment of which sum well and truly made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the Owner, dated the day of , 2024 a copy of which is hereto attached and made a part hereof for the construction of:
“ OLIVE AVENUE AND KNOX STREET
WIDENING AND INTERSECTION IMPROVEMENTS
OLIVE AVENUE TO NEPLUS WAY
CITY PROJECT NO. R-000010 Phase III”
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be null and void:
otherwise it shall remain in full force and effect.
PROVIDED FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.
PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. 33 IN WITNESS WHEREOF, this instrument is executed in THREE counterparts, each one of which shall be deemed an original, this the __________ day _________ 2024.
ATTEST:
Principal
BY: _________________________________(s)
(Principal) Secretary
(Seal)
(Witness as to Principal) (Address)
ATTEST:
(Surety) Secretary (Surety)
(SEAL)
BY:
Witness as to Surety Attorney in Fact
(Address) (Address)
NOTE: Date of Bond must not be prior to date of Contract. If Contractor is Partnership, all partners should execute Bond.
Attachment H
Insurance Requirements for Contractors
34 INSURANCE REQUIREMENTS FOR CONTRACTORS
Without limiting Contractor’s indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide, and continuously maintain at its own expense during the term of the Agreement, and shall require any and all Subcontractors and Subconsultants of every Tier to obtain and maintain, policies of insurance of the type and amounts described below and in form satisfactory to the City.
Minimum Scope and Limits of Insurance
Contractor shall maintain limits no less than: $2,000,000 General Liability (including operations, products and completed operations) per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability. Coverage shall be at least as broad as Insurance Services Office (ISO) Commercial General Liability coverage form CG 00 01. General liability policies shall be endorsed using ISO forms CG 20 10 and CG 20 37 to provide that the City and its officers, officials, employees and agents shall be additional insureds under such policies.
$1,000,000 Automobile Liability combined single limit per accident for bodily injury or property damage at least as broad as ISO Form CA 00 01 for all activities of Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles. Automobile Liability policies shall be endorsed to provide that the City and its officers, officials, employees and agents shall be additional insureds under such policies. Worker’s Compensation as required by the State of California and $1,000,000 Employer’s Liability per accident for bodily injury or disease. Contractor shall submit to the City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City, it’s officers, agents, employees, and volunteers.
Maintenance of Coverage
Contractor shall procure and maintain, for the duration of the contract, insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, his agents, representatives, employees, subcontractors or subconsultants as specified in this Agreement.
Proof of Insurance
Contractor shall provide to the City certificates of insurance and endorsements, as required, as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by the City prior to commencement of performance. Current evidence of insurance shall be kept on file with the City at all times during the term of this Agreement. Agency reserves the right to require complete, certified copies of all required insurance policies, at any time.
Acceptable Insurers
All insurance policies shall be issued by an insurance company currently authorized by the Insurance commissioner to transact business of insurance in the State of California, with an assigned policyholders’ Rating of A- (or higher) and a Financial Size Category Class VII (or larger), in accordance with the latest edition of Best’s Key Rating Guide.
Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City, its elected or appointed officers, agents, officials, employees, and volunteers, or shall specifically allow Contractor, or others providing insurance evidence in compliance with these specifications, to waive their right of recovery prior to a loss. 35 Contractor hereby waives its own right of recovery against the City and shall require similar written express waivers and insurance clauses from each of its subconsultants or subcontractors.
Enforcement of Contract Provisions (non estoppel)
Contractor acknowledges and agrees that any actual or alleged failure on the part of the Agency to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City, nor does it waive any rights hereunder.
Specifications not Limiting
Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If Contractor maintains higher limits than the minimums required above, the entity shall be entitled to coverage at the higher limits maintained by Contractor.
Notice of Cancellation
Contractor agrees to oblige its insurance agent or broker and insurers to provide to the City with thirty (30) calendar days notice of cancellation (except for nonpayment for which ten (10) calendar days notice is required) or nonrenewal of coverage for each required coverage.
Self-insured Retentions
Any self-insured retentions must be declared to and approved by the City. The City reserves the right to require that self-insured retentions be eliminated, lowered or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the City’s Risk Manager.
Timely Notice of Claims
Contractor shall give the City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional Insurance
Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgement may be necessary for its proper protection and prosecution of the Work.
Attachment I
Section 1, General Conditions
SECTION 1
GENERAL CONDITIONS
PAGE INTENTIONALLY LEFT BLANK
1.1 SECTION 1
GENERAL CONDITIONS
1-1 DEFINITIONS - Wherever used in the CONTRACT DOCUMENTS, the following terms shall have the meanings indicated, which shall be applicable to both the singular and plural thereof:
AASHTO - American Association of State Highway and Transportation Officials, current designation as of the Bid date unless otherwise indicated.
ACCEPTANCE - Project approved by Resolution or Minute Order of City Council of Madera.
ADDENDA - Written or graphic instruments issued prior to the execution of the Agreement which modify or interpret the CONTRACT DOCUMENTS, DRAWINGS and SPECIFICATIONS, by additions, deletions, clarifications or corrections.
ANSI - American National Standards Institute, current designation as of the Bid date unless otherwise.
ASME - American Society of Mechanical Engineers, current designation as of the Bid date unless otherwise indicated.
ASTM - American Society for Testing Materials, current designation as of the Bid date unless otherwise indicated.
AWWA - American Water Works Association, current designation as of the Bid date unless otherwise specified.
BID - The offer or proposal of the BIDDER submitted on the prescribed form setting forth the prices for the WORK to be performed.
BIDDER - Any person, firm or corporation submitting a BID for the WORK.
BONDS - Bid, Performance and Payment Bonds and other instruments of security, furnished by the CONTRACTOR and his surety in accordance with the CONTRACT DOCUMENTS.
BUSINESS LICENSE - A City of Madera Business License required for payment of the business tax based on gross receipts.
CALENDAR DAY - Each and every day of the year, including weekends and holidays.
CHANGE ORDER - A written order to the CONTRACTOR authorizing an addition, deletion or revision in the WORK within the general scope of the CONTRACT DOCUMENTS, or authorizing an adjustment in the CONTRACT PRICE or CONTRACT TIME.
COMPLETION - That date as certified by the ENGINEER when the construction of the PROJECT or a specified part thereof is sufficiently completed, in accordance with the CONTRACT DOCUMENTS so that the PROJECT or specified part can be utilized; or the purposes for which it is intended.
CONTRACT DOCUMENTS - The Contract, including Advertisement for Bids, Information for Bidders, BID, including Bid Representations and Certifications, Bid Bond, Agreement,
1.2 Payment Bond, Performance Bond, NOTICE OF AWARD, NOTICE TO PROCEED, CHANGE ORDER, General Conditions, Special Conditions, SPECIFICATIONS, DRAWINGS AND ADDENDA.
CONTRACT PRICE - The total moneys payable to the CONTRACTOR under the terms and conditions of the CONTRACT DOCUMENTS.
CONTRACT TIME - The number of calendar days stated in the CONTRACT DOCUMENTS for the completion of the WORK.
CONTRACTOR - The person, firm or corporation with whom the OWNER has executed the Agreement.
DRAWINGS - The part of the CONTRACT DOCUMENTS which shows the characteristics and scope of the WORK to be performed and which have been prepared or approved by the CITY ENGINEER.
ENGINEER - The City Engineer of the City of Madera, California FIELD ORDER - A written order effecting a change in the WORK not involving an adjustment in the CONTRACT PRICE or an extension of the CONTRACT TIME, issued by the ENGINEER to the CONTRACTOR during construction.
IEEE - Institute of Electrical and Electronics Engineers, current designation as of the Bid date unless otherwise indicated.
NEC - National Electric Code, current designation as of the Bid date, unless otherwise indicated.
NEMA - National Electrical Manufacturers Association, current designation as of the Bid date unless otherwise indicated.
NOTICE OF AWARD - The written notice of the acceptance of the BID from the OWNER to the successful BIDDER.
NOTICE TO PROCEED - Written communication issued by the OWNER to the CONTRACTOR authorizing him to proceed with the WORK and establishing the date of commencement of the WORK.
OWNER - The City of Madera, for whom the WORK is to be performed.
PROJECT - The undertaking to be performed as provided in the CONTRACT DOCUMENTS.
SHOP DRAWINGS - All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the CONTRACTOR, a SUBCONTRACTOR, manufacturer, supplier or distributor, which illustrate how specific portions of the WORK shall be fabricated or installed.
SJVAPCD - San Joaquin Valley Air Pollution Control District SPECIFICATIONS - A part of the CONTRACT DOCUMENTS consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards and workmanship.
1.3 STATE STANDARD SPECIFICATIONS - State of California, Department of Transportation Standard Specifications, 2018 Edition. Metric units shall be converted to English unit equivalents where applicable.
CALIFORNIA MANUAL ON TRAFFIC CONTROL DEVICES FOR STREETS & HIGHWAYS - FHWA’s MUTCD 2023 Edition, as approved for use in California.
SUBCONTRACTOR - An individual, firm or corporation having a direct contract with the CONTRACTOR or with any other SUBCONTRACTOR for the performance of a part of the WORK at the site.
SUPPLIER - Any person or organization who supplies materials or equipment for the WORK, including that fabricated to a special design, but who does not perform labor at the site.
SWPPP - Storm Water Pollution Prevention Plan on file with the City Engineer.
UNI - Uni-Bell Plastic Pipe Association, current designation as of the Bid date unless otherwise specified.
WORK - All labor necessary to produce the construction required by the CONTRACT DOCUMENTS, and all materials and equipment incorporated or to be incorporated in the PROJECT.
WRITTEN NOTICE - Any notice to any party of the Agreement relative to any part of this Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at his last given address, or delivered in person to said party or his authorized representative on the WORK. 1-2 ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS - The CONTRACTOR may be furnished additional instructions and detail drawings by the ENGINEER, as necessary to carry out the WORK required by the CONTRACT DOCUMENTS.
The additional drawings and instructions thus supplied will become a part of the CONTRACT DOCUMENTS. The CONTRACTOR shall carry out the WORK in accordance with the additional detail drawings and instructions.
1-3 SCHEDULES, REPORTS AND RECORDS - The CONTRACTOR shall submit to the OWNER such schedules, reports, records and other data as the OWNER may request concerning WORK performed or to be performed. Prior to the first partial payment estimate, the CONTRACTOR shall submit schedules showing the order in which he proposes to carry on the WORK, including dates at which he will start the various parts of the WORK, estimated date of completion of each part and, as applicable, the dates at which special detail drawings will be required, and respective dates for submission of SHOP DRAWINGS, the beginning of manufacture, the testing and the installation of materials, supplies and equipment. The CONTRACTOR shall also submit a schedule of payments that he anticipates he will earn during the course of the WORK. The CONTRACTOR shall not be entitled to any payment until he has submitted the schedule, reports and records required under this Section. The CONTRACTOR shall revise or update the schedule whenever requested to do so by the ENGINEER.
1-4 DRAWINGS AND SPECIFICATIONS - The intent of the DRAWINGS and SPECIFICATIONS is that the CONTRACTOR shall furnish all labor, materials, tools, equipment, and transportation necessary for the proper execution of the WORK in accordance with the
1.4 CONTRACT DOCUMENTS and all incidental work necessary to complete the PROJECT in an acceptable manner, ready for use, occupancy or operation by the OWNER.
In case of conflict between the DRAWINGS and SPECIFICATIONS, the SPECIFICATIONS shall govern. Figure dimensions on DRAWINGS shall govern over scale dimensions, and detailed DRAWINGS shall govern over general DRAWINGS. Any discrepancies found between the DRAWINGS AND SPECIFICATIONS and site conditions or any inconsistencies or ambiguities in the DRAWINGS or SPECIFICATIONS shall be immediately reported to the ENGINEER, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. WORK done by the CONTRACTOR after his discovery of such discrepancies, inconsistencies or ambiguities shall be done at the CONTRACTOR'S risk.
The OWNER will furnish to the CONTRACTOR, free of charge, all copies of DRAWINGS AND SPECIFICATIONS reasonably necessary for the execution of the WORK. The CONTRACTOR shall keep one copy of all current DRAWINGS AND SPECIFICATIONS on the job site, in good order, available to the ENGINEER and his representatives.
ALL DRAWINGS, SPECIFICATIONS, and copies thereof furnished by the OWNER are the property of the ENGINEER. They are not to be used on other work, and, with the exception of the signed Contract set, are to be returned to the ENGINEER on request, at the completion of the WORK.
1-5 PRECEDENCE OF CONTRACT DOCUMENTS - The order of precedence of documents shall be:
1. Rules and Regulations of State Agencies relating to the source of funds for a project.
2. Permits from other agencies as may be required by law.
3. Supplemental Agreements, Change Orders, or Contract, the one dated later having precedence over another dated earlier.
4. Special Conditions.
5. General Conditions.
6. Technical Specifications.
7. Plans.
8. Standard specifications.
9. Standard Plans.
Change orders, supplemental agreements and approved revisions to plans and specifications will take precedence over documents listed above. Detailed plans shall have precedence over general plans.
Whenever any conflict appears in any portions of the contract, it shall be resolved by application of the order of precedence.
1-6 SHOP DRAWINGS - The CONTRACTOR shall provide SHOP DRAWINGS as may be necessary for the prosecution of the WORK as required by the CONTRACT DOCUMENTS.
For each item where a SHOP DRAWING is required, the CONTRACTOR shall submit a minimum of six (6) prints. The ENGINEER shall promptly review all SHOP DRAWINGS and retain three sets after his review. All additional copies shall be returned to the CONTRACTOR. If the CONTRACTOR requires more than three prints returned, he shall accordingly increase the number of prints submitted to the ENGINEER. The ENGINEER'S review of any SHOP DRAWINGS shall not release the CONTRACTOR from responsibility for deviations from the CONTRACT DOCUMENTS. The review of any SHOP DRAWING which substantially deviates from the requirements of the CONTRACT DOCUMENTS shall be evidenced by a CHANGE ORDER.
1.5 When submitted for the ENGINEER'S review, SHOP DRAWINGS shall bear the CONTRACTOR'S certification that he has reviewed, checked and approved the SHOP DRAWINGS and that they are in conformance with the requirements of the CONTRACT DOCUMENTS.
Portions of the WORK requiring a SHOP DRAWING or sample submission shall not begin until the SHOP DRAWING or submission has been reviewed by the ENGINEER. A copy of each SHOP DRAWING and each sample shall be kept in good order by the CONTRACTOR at the site and shall be available to the ENGINEER.
1-7 MATERIALS, SERVICES AND FACILITIES - It is understood that, except as otherwise specifically stated in the CONTRACT DOCUMENTS, the CONTRACTOR shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, supervision, and all other services and facilities of any nature whatsoever necessary to execute, complete, and deliver the WORK within the specified time.
Materials and equipment shall be so stored as to insure the preservation of their quality and fitness for the WORK. Stored materials and equipment to be incorporated in the WORK shall be located so as to facilitate prompt inspection.
Manufactured articles, materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer.
Materials, supplies, and equipment shall be in accordance with samples submitted by the CONTRACTOR and reviewed by the ENGINEER.
Materials, supplies or equipment to be incorporated into the WORK shall not be purchased by the CONTRACTOR or any SUBCONTRACTOR subject to a chattel mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. 1-8 INSPECTION AND TESTING - All materials and equipment used in the construction of the PROJECT shall be subject to adequate inspection and testing in accordance with generally accepted standards, as required and defined in the CONTRACT DOCUMENTS. No work requiring material testing or material inspection shall be performed on Saturdays, Sundays, or City-designated holidays.
All initial compaction and materials tests shall be performed at no expense to the CONTRACTOR. The cost of each subsequent retest shall be paid for by the CONTRACTOR if the first tests fail to meet the required relative compaction or specified strength. Additional materials testing shall be performed by the OWNER at the CONTRACTOR's expense as described in the various sections of the Technical Specifications.
The OWNER shall provide all other inspection and testing services not required by the CONTRACT DOCUMENTS. If the CONTRACT DOCUMENTS, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction specifically require any WORK to be inspected, tested, approved by someone other than the CONTRACTOR, the CONTRACTOR will give the ENGINEER timely notice of readiness. The CONTRACTOR will furnish the ENGINEER the required certificates of inspection, testing or approval.
Neither observations by the ENGINEER nor inspections, tests or approvals by persons other than the CONTRACTOR shall relieve the CONTRACTOR from his obligations to perform the WORK in accordance with the requirements of the CONTRACT DOCUMENTS.
1.6 The ENGINEER and his representatives will at all times have access to the WORK. In addition, authorized representatives and agents of the OWNER and appropriate Federal or State agencies shall be permitted to inspect all work, materials, payrolls, records of personnel, invoices of materials, and other relevant data and records. The CONTRACTOR will provide proper facilities for such access and observation of the WORK and also for any inspection or testing thereof.
If any WORK is covered contrary to the written request of the ENGINEER, it must, if requested by the ENGINEER, be uncovered for his observation and replaced at the CONTRACTOR'S expense.
If any WORK has been covered which the Engineer has not specifically requested to observe prior to its being covered, or if the ENGINEER considers it necessary or advisable that covered WORK be inspected or tested by others, the CONTRACTOR, at the ENGINEER'S request, will uncover, expose or otherwise make available for observation, inspection or testing as the ENGINEER may require, that portion of the WORK in question, furnishing all necessary labor, materials, tools, and equipment. If it is found that such WORK is defective, the CONTRACTOR will bear all the expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction. If, however, such WORK is not found to be defective, the CONTRACTOR will be allowed an increase in the CONTRACT PRICE or an extension of the CONTRACT TIME, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction and an appropriate CHANGE ORDER shall be issued.
1-9 SUBSTITUTIONS - Wherever a material, article or piece of equipment is identified on the DRAWINGS or SPECIFICATIONS by reference to brand name or catalogue number, it shall be understood that this is referenced for the purpose of defining the performance or other salient requirements and that other products of equal capacities, quality and function shall be considered. The CONTRACTOR may recommend the substitution of a material, article or piece of equipment of equal substance and function for those referred to in the CONTRACT DOCUMENTS by reference to brand name or catalogue number, and if, in the opinion of the ENGINEER, such material, article, or piece of equipment is of equal substance and function to that specified, the ENGINEER may approve its substitution and use by the CONTRACTOR. The CONTRACTOR warrants that if substitutes are approved, no major changes in the function or general design of the PROJECT will result. Incidental changes or extra component parts required to accommodate the substitute will be made by the CONTRACTOR without a change in the CONTRACT PRICE or CONTRACT TIME. 1-10 PATENTS - The CONTRACTOR shall pay all applicable royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and save the OWNER harmless from loss on account thereof, except that the OWNER shall be responsible for any such loss when a particular process, design, or the product of a particular manufacturer or manufacturers is specified, but if the CONTRACTOR has reason to believe that the design, process or product specified is an infringement of a patent, he shall be responsible for such loss unless he promptly gives such information to the ENGINEER. 1-11 SURVEYS, PERMITS AND REGULATIONS - Control staking by the ENGINEER is limited to providing a reference line and temporary or permanent benchmarks for the CONTRACTOR’s use in staking the project to conform to the plans. Center line monuments will be referenced by the ENGINEER to facilitate replacement after the job is completed. Where possible, center line monuments and all other survey monuments in or adjacent to the project shall be preserved. The cost of replacement of monuments, which in the opinion of the ENGINEER need not have been destroyed, shall be deducted from the moneys due or to become due the Contractor for this project. Supplementary construction staking information to be provided by
1.7 the ENGINEER shall consist of electronic drawing files in the AUTOCAD format currently in use by the Design Engineer.
When monuments exist that control the location of boundaries, roads, streets, or provide survey control, the monuments shall be located and referenced by or under the direction of a licensed land surveyor or registered civil engineer prior to the time when any streets or other rights-of-way are improved or reconstructed and a corner record or record of survey of the references shall be filed with the County Surveyor. They shall be reset in the surface of the new construction in the manner shown on the DRAWINGS to perpetuate their location and a corner record or record of survey shall be filed with the County Surveyor prior to the recording of a Certificate of Completion for the project. It shall be the responsibility of the CONTRACTOR to provide for the monumentation required by this section.
All construction staking shall be the responsibility of the CONTRACTOR. Construction staking costs shall be included in the unit price of the various items of work and no additional monies shall be paid.
Reference lines and marks set by the ENGINEER shall be carefully preserved by the CONTRACTOR. In case such references or markings are destroyed or damaged by reason of the CONTRACTOR's operations, the cost of restoring them will be deducted from any moneys due or to become due the CONTRACTOR. Unless otherwise shown, all measurements and elevations on the plans are in feet and decimals of a foot.
The CONTRACTOR shall make a general check of all lines, dimensions and elevations and shall make all necessary rechecks during the progress of the WORK to avoid errors in construction. The CONTRACTOR shall be responsible for proper dimensions and fittings of all items of WORK being performed by him. Should any discrepancy be found in lines, dimensions, or elevations, they shall be reported to the ENGINEER immediately.
The CONTRACTOR shall protect all existing property and survey monuments, including survey control monuments for this WORK. Where it is necessary to disturb existing property, survey or control monuments in order to permit the prosecution of the WORK within the permanent and construction right-of-way, such monuments shall be reset by the CONTRACTOR. Such monuments shall not be disturbed during the prosecution of the WORK unless the CONTRACTOR has given the OWNER a minimum of 72 hours notice of the CONTRACTOR'S intent to disturb such monuments during the prosecution of his WORK. 1-12 LICENSE(S) & PERMITS - The CONTRACTOR shall have a City Business License prior to the beginning of WORK. Permits and licenses of a temporary nature necessary for the prosecution of the WORK shall be secured and paid for by the CONTRACTOR. Permits, licenses and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the OWNER, unless otherwise specified. The CONTRACTOR shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the WORK as drawn and specified. If the CONTRACTOR observes that the CONTRACT DOCUMENTS are at variance therewith, he shall promptly notify the ENGINEER in writing, and any necessary changes shall be adjusted as provided in Section 1-14, CHANGES IN THE WORK.
1-13 PROTECTION OF WORK, PROPERTY AND PERSONS - The CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the WORK. He will take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to all employees on the WORK and other persons who may be affected thereby, all the WORK and all materials or equipment to be incorporated therein, whether in storage on or off the site, and other property
1.8 at the site or adjacent thereto, including trees, shrubs, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction.
The CONTRACTOR shall comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction. He shall erect and maintain, as required by the conditions and progress of the WORK, all necessary safeguards for safety and protection. He shall notify owners of adjacent utilities when prosecution of the WORK may affect them. The CONTRACTOR shall remedy all damage, injury or loss to any property caused, directly or indirectly, in whole or in part, by the CONTRACTOR, any SUBCONTRACTOR or anyone directly or indirectly, in whole or in part, by the CONTRACTOR, any SUBCONTRACTOR or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except damage or loss attributable to the fault of the CONTRACT DOCUMENTS or to the acts or omissions of the OWNER or the ENGINEER or anyone employed by either of them or anyone for whose acts either of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of the CONTRACTOR.
In emergencies affecting the safety of persons or the WORK or property at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the ENGINEER or OWNER, shall act to prevent threatened damage, injury or loss. He will give the ENGINEER prompt WRITTEN NOTICE of any significant changes in the WORK or deviations from the CONTRACT DOCUMENTS caused thereby, and a CHANGE ORDER shall thereupon be issued covering the changes and deviations involved. 1-14 SUPERVISION BY CONTRACTOR - The CONTRACTOR shall supervise and direct the WORK. He shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The CONTRACTOR shall employ and maintain on the WORK a qualified supervisor or superintendent who shall have been designated in writing by the CONTRACTOR as the CONTRACTOR'S representative at the site. The supervisor shall have full authority to act on behalf of the CONTRACTOR and all communications given to the supervisor shall be as binding as if given to the CONTRACTOR. The supervisor shall be present on the site at all times as required to perform adequate supervision and coordination of the WORK.
1-15 CHANGES IN THE WORK - The OWNER may at any time, as the need arises, order changes within the scope of the WORK without invalidating the Agreement. If such changes increase or decrease the amount due under the CONTRACT DOCUMENTS, or in the time required for performance of the WORK, an equitable adjustment shall be authorized by CHANGE ORDER.
The ENGINEER may also, at any time, by issuing a FIELD ORDER, make changes in the details of the WORK. The CONTRACTOR shall proceed with the performance of any changes in the WORK so ordered by the ENGINEER unless the CONTRACTOR believes that such FIELD ORDER entitles him to a change in CONTRACT PRICE or CONTRACT TIME, or both, in which event he shall give the ENGINEER WRITTEN NOTICE thereof within seven (7) days after the receipt of the ordered change, and the CONTRACTOR shall not execute such changes pending the receipt of an executed CHANGE ORDER or further instruction from the OWNER.
1-16 CHANGES IN CONTRACT PRICE - The CONTRACT PRICE may be changed only by a CHANGE ORDER. The value of any WORK covered by a CHANGE ORDER or any claim for increase or decrease in the CONTRACT PRICE shall be determined by one or more of the following methods in the order of precedence listed below:
1.9 (A) Unit prices previously approved.
(B) An agreed lump sum.
(C) If a lump sum or unit price cannot be mutually agreed upon, the CONTRACTOR shall be entitled to the sum of the following costs of doing the extra work:
(1) Direct Labor Costs. Charges for cost of all the labor furnished and used by the CONTRACTOR shall be made for manual classifications up to and including general foreman. It will not include charges for Assistant Superintendents, Superintendents, Office Personnel, Timekeepers, and Maintenance Mechanics. The time charged to extra work shall be subject to the daily approval of the ENGINEER and evidence of such daily approval shall be submitted with the billing.
Labor rates used to calculate the costs shall be those so designated in the Advertisement for Bids. No time or charges will be allowed, except when the men are actually engaged in the proper, efficient, and diligent performance or completion of the extra work as authorized. Overtime shall not be worked without prior approval by the ENGINEER.
(2) Equipment Costs. Charges for the rental and operation of the equipment furnished and used by the CONTRACTOR shall be made for all prime construction and automotive equipment. It will not include charges for equipment or tools with a new cost of $500.00 or less. Equipment time charges must be subject to the daily approval of the ENGINEER and evidence of such daily approval submitted with the billing. The equipment rental and operation rates used shall be those agreed upon by the ENGINEER and the CONTRACTOR prior to commencement of the extra work.
No time or charges will be allowed except when equipment is actually being used for the proper and efficient performance or completion of the extra work as authorized. (3) Material Costs. Charges for the cost of materials furnished by the CONTRACTOR shall be made providing such furnishing was specifically authorized in the extra work order and the actual use verified by the ENGINEER. Charges must be net cost to the CONTRACTOR delivered at the job, and vendor's invoice must accompany the billing along with verification of use of such materials by the ENGINEER.
(4) Tools, Supplies, Overhead, Supervision, and Profit. A charge for tools, supplies, overhead, supervision and profit will be allowed in the amount of 15% of the total Direct Labor Costs and Material Costs, as defined above, and 5% for work by Subcontractors.
Any extra work performed hereunder shall be subject to all of the provisions of the CONTRACT and the CONTRACTOR'S sureties shall be bound with reference thereto as under the CONTRACT.
1-17 TIME FOR COMPLETION AND LIQUIDATED DAMAGES - The date of beginning and the time for completion of the WORK are essential conditions of the CONTRACT DOCUMENTS and the WORK embraced shall be commenced on a date specified in the NOTICE TO PROCEED and be fully completed in One Hundred Twenty (120) Calendar.
Time is of the essence in this agreement. The CONTRACTOR shall proceed with the WORK at such rate of progress to insure full completion within the CONTRACT TIME. It is expressly understood and agreed, by and between the CONTRACTOR and the OWNER, that the
1.10 CONTRACT TIME for the completion of the WORK, or specific portions of the WORK, described herein in a reasonable time.
The parties hereto agree that it is extremely difficult and impractical in this case to determine the actual damages the OWNER will suffer if the CONTRACTOR fails to complete the WORK within the CONTRACT TIME and for said reason, if the CONTRACTOR shall fail to complete the WORK within the CONTRACT TIME, or extension of time granted by the OWNER, then the CONTRACTOR will pay to the OWNER, the amount for liquidated damages as specified in the BID for each calendar day that the CONTRACTOR shall be in default after the time stipulated in the CONTRACT DOCUMENTS. The time for completion of the WORK shall be extended, and the CONTRACTOR shall not be charged with liquidated damages or any excess cost when the delay in completion of the WORK is due to the following, and the CONTRACTOR has promptly given WRITTEN NOTICE of such delay to the OWNER or ENGINEER:
A. To any preference, priority or allocation order duly issued by the OWNER.
B. To unforeseeable causes beyond the control and without the fault or negligence of the CONTRACTOR, including but not restricted to, acts of God or of the public enemy, acts of the OWNER, acts of another CONTRACTOR in the performance of a contract with the OWNER, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and climatic conditions which, in the opinion of the ENGINEER, make prosecution of the WORK unreasonably difficult.
C. To any delays of SUBCONTRACTORS occasioned by any of the causes specified in the above paragraphs.
1-18 CORRECTION OF WORK - The CONTRACTOR shall promptly remove from the premises all WORK rejected by the ENGINEER for failure to comply with the CONTRACT DOCUMENTS, whether incorporated in the construction or not, and the CONTRACTOR shall promptly replace and re-execute the WORK in accordance with the CONTRACT DOCUMENTS and without expense to the OWNER shall bear the expense of making good all WORK of other contractors destroyed or damaged by such removal or replacement. 1-19 SUSPENSION OF WORK, TERMINATION AND DELAY - The OWNER may, at any time and without cause, suspend the WORK or any portion thereof for a period of not more than ninety (90) days, or such further time as agreed upon by the CONTRACTOR, by WRITTEN NOTICE to the CONTRACTOR and the ENGINEER, which notice shall fix the date on which WORK shall be resumed. The CONTRACTOR will resume that WORK on the date so fixed.
The CONTRACTOR will be allowed an increase in the CONTRACT PRICE or an extension of the CONTRACT TIME, or both, directly attributable to any such suspension.
If the CONTRACTOR is adjudged as bankrupt or insolvent, or if he makes a general assignment for the benefit of his creditors, or if a trustee or receiver is appointed for the CONTRACTOR or for any of his property, or if he files a petition to take advantage of any debtor's act, or to reorganize under the bankruptcy or applicable laws, or if he repeatedly fails to supply sufficient skilled workmen or suitable materials or equipment, or if he repeatedly fails to make prompt payments to SUBCONTRACTORS or for labor, material or equipment or if he disregards laws, ordinances, rules, regulations or orders of any public body having jurisdiction of the WORK or if he disregards the authority of the ENGINEER, or if he otherwise violates any provision of the CONTRACT DOCUMENTS, then the OWNER may, without prejudice to any other right or remedy and after giving the CONTRACTOR and his surety a minimum of ten (10) days from delivery of a WRITTEN NOTICE, terminate the services of the CONTRACTOR and take possession of the PROJECT and of all the
1.11 materials, equipment, tools, constructing equipment and machinery thereon owned by the CONTRACTOR, and finish the WORK by whatever method he may deem expedient. In such case the CONTRACTOR shall not be entitled to receive any further payment until the WORK is finished. If the unpaid balance of the CONTRACT PRICE exceeds the direct and indirect costs of completing the PROJECT, including compensation for additional professional services, such excess shall be paid to the CONTRACTOR. If such costs exceed such unpaid balance, the CONTRACTOR shall pay the difference to the OWNER.
Such costs incurred by the OWNER will be determined by the ENGINEER and incorporated in a CHANGE ORDER.
Where the CONTRACTOR'S services have been so terminated by the OWNER, said termination shall not affect any right of the OWNER against the CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys by the OWNER due the CONTRACTOR will not release the CONTRACTOR from compliance with the CONTRACT DOCUMENTS.
After ten (10) days from delivery of a WRITTEN NOTICE to the CONTRACTOR and the ENGINEER, the OWNER may without cause and without prejudice to any other right or remedy, elect to abandon the PROJECT and terminate the Contract. In such case, the CONTRACTOR shall be paid for all WORK executed and any expense sustained plus reasonable profit.
If, through no act or fault of the CONTRACTOR, the WORK is suspended for a period of more than ninety (90) days by the OWNER or under an order of court or other public authority, or the ENGINEER fails to act on any request for payment within thirty (30) days after it is submitted, or the OWNER fails to pay the CONTRACTOR substantially the sum approved by the ENGINEER or awarded by arbitrators within thirty (30) days of its approval and presentation, then the CONTRACTOR may, after the (10) days from delivery of a WRITTEN NOTICE to the OWNER and the ENGINEER, terminate the Contract and recover from the OWNER payment for all WORK executed and all expenses sustained. In addition and in lieu of terminating the Contract, if the ENGINEER has failed to act on a request for payment or if the OWNER has failed to make any payment as aforesaid, the CONTRACTOR may upon ten (10) days notice to the OWNER and the ENGINEER stop the WORK until he has been paid all amounts then due, in which event and upon resumption of the WORK, CHANGE ORDERS shall be issued for adjusting the CONTRACT PRICE or extending the CONTRACT TIME or both to compensate for the costs and delays attributable to the stoppage of the WORK.
If the performance of all or any portion of the WORK is suspended, delayed, or interrupted as a result of a failure of the OWNER or ENGINEER to act within the time specified in the CONTRACT DOCUMENTS, or, if no time is specified, within a reasonable time, an adjustment in the CONTRACT PRICE or an extension of the CONTRACT TIME, or both, shall be made by CHANGE ORDER to compensate the CONTRACTOR for the costs and delays necessarily caused by the failure of the OWNER or ENGINEER. 1-20 PROGRESS ESTIMATE - On or about the last day of the calendar month, the CONTRACTOR will, except as hereinafter provided, make in writing and certify to the ENGINEER an estimate of the amount and value of the work completed by the CONTRACTOR up to that time in the performance of the Contract. In case of work for which unit prices are named in the Contract, the estimate shall be computed on the basis of said unit prices. In the case of work for which a lump sum is named in the Contract, the CONTRACTOR may use a breakdown of the lump sum price, provided that such breakdown is submitted within 15 calendar days after the execution of the Contract Agreement in a form
1.12 acceptable to the ENGINEER. No payment will be made to the CONTRACTOR until such schedule has been submitted to and reviewed by the ENGINEER. To the figure thus arrived at shall be added any amounts due the CONTRACTOR for extra work and the amount of any approved claims for extra costs to the date of the Progress Estimate. The retained percentage hereinafter provided for shall be deducted from the total thus computed; and from the remainder, there shall be further deducted any amounts due the OWNER from the CONTRACTOR for supplies or materials furnished or services rendered and any other amounts that may be due the OWNER under the terms of the Contract. In preparing estimates for partial payments, consideration shall be given to delivery on the site of pipe, valves, fittings and miscellaneous metal which will become a part of the finished construction work and for which payment in full has been made by the CONTRACTOR, but no consideration will be given to preparatory work done or other materials on hand. From the balance thus determined shall be deducted the amount of all previous payments and the remainder shall constitute the partial estimate for that month. Such partial estimates shall not be required to be made by strict measurement, but may be made by measurement or by estimation or partly by one method and partly by the other and it shall be sufficient if they are approximate only. Partial estimates may be withheld or reduced if, in the opinion of the ENGINEER, the CONTRACTOR is not diligently and efficiently endeavoring to comply with the intent of the Contract. No such estimate or payment shall be construed to be an acceptance of any defective work or improper materials. Progress estimates shall be made in the form of itemized invoices in triplicate and shall be submitted together with the data set forth below:
A recapitulation showing balance due current month as follows:
Total Contract Price
Extra Work Ordered
Total Contract Price w/ CCO’s
Gross Earnings to Date
(Including extra work ordered)
Less 10% of gross Earnings to Date
Net Earnings to Date
Less Previous Claims
Balance Due this Claim
1-21 PROGRESS PAYMENTS - The OWNER will make payments on account of the Contract as follows: Not later than the 30th day of the month following the month in which the Contract is awarded, and the 30th day of each calendar month thereafter, the OWNER will pay to the CONTRACTOR 95% (5% retention) of the amount earned by the CONTRACTOR during the preceding month at the rate of prices set forth in the Contract, based on the estimate of the CONTRACTOR as reviewed and approved by the ENGINEER. At the request and expense of the CONTRACTOR 100% of the amount earned, which is funded by non-federal moneys, will be paid as specified above provided securities are substituted for the retention withheld.
Securities shall be deposited with the OWNER or with a State or federally chartered bank as the escrow agent. In the event the securities are to be deposited with an escrow agent, CONTRACTOR agrees to execute any and all necessary documents including an escrow
1.13 agreement substantially similar to the form set forth in Public Contract Code, Section 22300.
Securities eligible for substitution shall include those listed in Section 16430 of the Government Code or bank or savings and loan certificates of deposit. The CONTRACTOR shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon. If the OWNER fails to make payment by the date specified above, in addition to other remedies available to the CONTRACTOR, there shall be added to each such payment interest at the maximum legal rate commencing on the first day after said payment is received by the CONTRACTOR.
The retention will be held by the OWNER or the securities will be held by the OWNER or escrow agent until thirty five (35) days following filing of the Notice of Completion. 1-22 FINAL ESTIMATE - Upon completion of the contract and final inspection and acceptance by the ENGINEER, the ENGINEER shall prepare a final estimate of quantities and the value of such work and the OWNER shall pay to the CONTRACTOR the entire sum so found to be due after deducting therefrom all previous payments and all amounts to be retained under the provisions of the CONTRACT. All prior progress estimates and payments shall be subject to correction in the final estimate and payment.
1-23 ACCEPTANCE & FINAL PAYMENT - Upon receipt of the WRITTEN NOTICE from the CONTRACTOR that the WORK is ready for final inspection and acceptance, the ENGINEER will promptly make such inspection, and when he finds the WORK acceptable under the CONTRACT, and the CONTRACT fully performed, he will promptly issue a final certificate, over his own signature, stating that the WORK required by this Contract has been completed and recommending acceptance of the Work by the OWNER. The OWNER, after acceptance of the work by City Council, then shall issue a formal Notice of Acceptance, and the entire balance found to be due shall be paid to the CONTRACTOR by the OWNER thirty five (35) days from the date of recording by the OWNER of the Notice of Acceptance of all WORK covered by this Contract.
Before issuance of the Notice of Acceptance, the CONTRACTOR shall submit evidence satisfactory to the OWNER that all payrolls, materials bills, and other indebtedness connected with the WORK have been paid, or if not paid, then the CONTRACTOR shall submit evidence of the status of any unpaid indebtedness.
The making and acceptance of the final payment shall constitute a waiver of all claims by the OWNER except the following:
A. those arising from unsettled liens;
B. those arising from faulty work appearing within twelve (12) months after the date of filing of the Notice of Acceptance;
C. those arising from failure to meet the requirements of the SPECIFICATIONS; or, D. those arising from manufacturers' guarantees.
It shall also constitute a waiver of all claims by the CONTRACTOR except those previously made and still unsettled.
All prior certificates upon which partial payment may have been made, being merely estimates, shall be subject to a correction on the final certificate.
1.14 1-24 QUANTITIES & UNIT PRICES - The quantities noted in the schedule are approximations for comparing BIDS, and no claim shall be made against the OWNER for excess or deficiency therein. Payment at the unit or lump sum prices set forth in the schedule will constitute payment in full for the completed WORK and will include materials, supplies, labor, tools, machinery, and all other expenditures incident to satisfactory compliance with the Contract, unless otherwise specifically provided.
The quantities of WORK performed will be computed for payment by the ENGINEER on the basis of measurements taken by the ENGINEER, and these measurements shall be final and binding.
1-25 PROOF OF CARRIAGE OF INSURANCE - CONTRACTOR shall furnish such insurance coverage as indicated in the section “INSURANCE REQUIREMENTS FOR CONTRACTORS”.
A. "General Liability Special Endorsement"
B. "Automobile Liability Special Endorsement"
C. "Workers' Compensation/Employees Liability Special Endorsement" D. "Certificate of Insurance"
All of the above to be submitted prior to execution of this agreement.
Insurance shall be provided by an insurance company licensed to transact such business in the State of California with a current A.M. Best’s rating of no less than A:VII. Liability insurance shall be written on an "occurrence" basis.
CONTRACTOR shall furnish OWNER, through the ENGINEER, concurrently with the execution thereof, with satisfactory proof of carriage of the insurance required and that each carrier shall give OWNER at least thirty (30) days prior notice of the cancellation of any policy during the effective period of this contract.
1-26 CONTRACT SECURITY - The CONTRACTOR shall, within ten (10) days after the receipt of the NOTICE OF AWARD, furnish the OWNER with a Performance Bond and a Payment Bond in penal sums equal to the amount of the CONTRACT PRICE, conditioned upon the performance by the CONTRACTOR of all undertakings, covenants, terms, conditions and agreements of the CONTRACT DOCUMENTS, and upon the prompt payment by the CONTRACTOR to all persons supplying labor and materials in the prosecution of the WORK provided by the CONTRACT DOCUMENTS.
Such bonds shall be executed by the CONTRACTOR and a corporate bonding company licensed to transact such business in the State of California. The bonding company shall be an admitted surety holding a certificate of authority to transact surety insurance in California issued by the Insurance Commissioner. The expense of these bonds shall be borne by the CONTRACTOR. If at any time a surety on any such bond is declared a bankrupt or loses its right to do business in the state in which the WORK is to be performed, CONTRACTOR shall within ten (10) days after notice from the OWNER to do so, substitute an acceptable bond (or bonds) in such form and sum and signed by such other surety or sureties as may be satisfactory to the OWNER. The premiums on such bond(s) shall be paid by the CONTRACTOR. No further payments shall be deemed due nor shall be made until the new surety or sureties shall have furnished an acceptable bond to the OWNER. 1-27 ASSIGNMENTS - Neither the CONTRACTOR nor the OWNER shall sell, transfer, assign or otherwise dispose of the Contract or any portion thereof, or of his right, title or interest therein, or his obligation thereunder, without written consent to the other party.
1.15 1-28 INDEMNIFICATION - The CONTRACTOR will indemnify and hold harmless the OWNER and their officers, agents, employees, from and against all claims, damages, losses and expenses, including attorney's fees, arising out of or resulting from the performance of the WORK, provided that any such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, caused in whole or in part by any negligent or willful act or omission of the CONTRACTOR, or any SUBCONTRACTOR, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. The obligation of the CONTRACTOR under this paragraph shall not extend to the liability of the OWNER, his agents or employees arising out of the preparation or review of maps, DRAWINGS, opinions, reports, surveys, CHANGE ORDERS, design or SPECIFICATIONS.
1-29 SEPARATE CONTRACTS - The OWNER reserves the right to let other contracts in connection with this PROJECT. The CONTRACTOR shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their WORK, and shall properly connect and coordinate his WORK with theirs. If the proper execution or results of any part of the CONTRACTOR'S work depend upon the work of any other contractor, the CONTRACTOR shall inspect and promptly report to the ENGINEER any defects in such WORK that render it unsuitable for such proper execution and results.
The OWNER may perform additional WORK related to the PROJECT by himself, or he may let other contracts containing provisions similar to these. The CONTRACTOR will afford the other contractors who are parties to such contracts (or the OWNER, if he is performing the additional WORK himself), reasonable opportunity for the introduction and storage of materials and equipment and the execution of WORK, and shall properly connect and coordinate his WORK with theirs.
If the performance of additional WORK by other contractors or the OWNER is not noted in the CONTRACT DOCUMENTS prior to the execution of the Contract, written notice thereof shall be given to the CONTRACTOR prior to starting any such additional WORK. If the CONTRACTOR believes that the performance of such additional WORK by the OWNER or others involves him in additional expense or entitles him to an extension of the CONTRACT TIME, he may make a claim therefore as provided in Sections 1-14 and 1-15. 1-30 SUBCONTRACTING - The CONTRACTOR may utilize the services of specialty SUBCONTRACTORS on those parts of the WORK which, under normal contracting practices, are performed by specialty SUBCONTRACTORS.
The CONTRACTOR shall perform with its own organization contract work amounting to not less than 30 percent of the total original contract bid price, excluding any specialty items designated by the OWNER. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the CONTRACTO’S organization (23 CFR 635).
The CONTRACTOR shall be fully responsible to the OWNER for the acts and omissions of his SUBCONTRACTORS, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him.
The CONTRACTOR shall cause appropriate provisions to be inserted in all subcontracts relative to the WORK to bind SUBCONTRACTORS to the CONTRACTOR by the terms of the CONTRACT DOCUMENTS in so far as applicable to the WORK of SUBCONTRACTORS and to give the CONTRACTOR the same power as regards terminating any subcontract that
1.16 the OWNER may exercise over the CONTRACTOR under any provision of the CONTRACT DOCUMENTS.
Nothing contained in this Contract shall create any contractual relation between any SUBCONTRACTOR and the OWNER.
1-31 ENGINEER'S AUTHORITY - The ENGINEER shall act as the OWNER'S representative. He shall decide questions which may arise as to quality and acceptability of materials furnished and WORK performed. He shall interpret the intent of the CONTRACT DOCUMENTS in a fair and unbiased manner. The ENGINEER will make visits to the site and determine if the WORK is proceeding in accordance with the CONTRACT DOCUMENTS.
The CONTRACTOR will be held strictly responsible to the intent of the CONTRACT DOCUMENTS in regard to the quality of materials, workmanship and execution of the WORK. Inspections may be made at the factory or fabrication plant of the source of material supply.
The ENGINEER will not be responsible for the construction means, controls, techniques, sequences, procedures, or construction safety.
1-32 LAND AND RIGHTS-OF-WAY - Prior to issuance of the NOTICE TO PROCEED, the OWNER shall obtain all land and rights-of-way necessary for carrying out and for the completion of the WORK to be performed pursuant to the CONTRACT DOCUMENTS, unless otherwise mutually agreed.
The OWNER shall provide to the CONTRACTOR information which delineates and describes the lands owned and rights-of-way acquired. The CONTRACTOR shall provide, at his own expense and without liability to the OWNER, any additional land and access thereto that the CONTRACTOR may desire for temporary construction facilities, or for storage of materials. 1-33 GUARANTY - Unless stipulated otherwise in the SPECIFICATIONS, the CONTRACTOR shall guarantee all materials and equipment furnished and WORK performed for a period of one (1) year from the date of completion. The CONTRACTOR warrants and guarantees for a period of one (1) year from the date of completion of the system that the completed system is free from all defects due to faulty materials and workmanship and the CONTRACTOR shall promptly make such corrections as may be necessary by reason of such defects including the repairs of any damage to other parts of the system resulting from such defects. The OWNER will give notice of observed defects with reasonable promptness. In the event that the CONTRACTOR should fail to make such repairs, adjustments, or other WORK that may be made necessary by such defects, the OWNER may do so and charge the CONTRACTOR the cost thereby incurred. The Performance Bond shall remain in full force and effect through the guarantee period.
1-34 TAXES - The CONTRACTOR shall pay all sales, consumer, use and other similar taxes required by the law of the place where the WORK is performed. 1-35 CONTRACTOR'S UNDERSTANDING - It is understood and agreed that the CONTRACTOR has, by careful examination, satisfied himself as to the nature and extent of the WORK, the character, quality, and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the WORK, the general and local conditions, and all other matters which can in any way affect the WORK under this Contract. No verbal agreement or conversation with any officer, agent or employee of the OWNER, either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained.
1.17 1-36 ACCIDENTS - The CONTRACTOR shall provide, at the site, such equipment and medical facilities as are necessary to supply first-aid service to anyone who may be injured in connection with the WORK. The CONTRACTOR must promptly report in writing to the ENGINEER all accidents whatsoever arising out of, or in connection with the performance of the WORK, whether on or adjacent to the site which causes death, personal injury, or property damages are caused, the accident shall be reported immediately by telephone or messenger to both the ENGINEER and the OWNER. If any claim is made by anyone against the CONTRACTOR or any SUBCONTRACTOR on account of any accident, the CONTRACTOR shall promptly report the facts in writing to the ENGINEER, giving full details of the claim.
1-37 SAFETY AND SANITATION - The CONTRACTOR shall provide adequate safety and sanitation facilities according to State Laws and local ordinances. 1-38 CLIMATIC CONDITIONS - The ENGINEER may order the CONTRACTOR to suspend any WORK that may be subject to damage by climatic conditions. The CONTRACTOR may suspend WORK if climatic conditions are such that the CONTRACTOR is unable to work. In such case, the CONTRACTOR, within seven (7) days, shall request in writing a CHANGE ORDER to extend the CONTRACT TIME.
1-39 OFFICIALS NOT TO BENEFIT - No official of the OWNER shall receive any benefit that may arise by reason of this Contract.
1-40 CLEAN-UP - During the progress of the WORK, the CONTRACTOR shall maintain the site and related structures and equipment in a clean, orderly condition and free from unsightly accumulations of rubbish. Upon completion of the WORK, the CONTRACTOR shall remove from the vicinity of the WORK all plants, buildings, rubbish, unused materials, concrete forms, temporary bridging, and other like material, belonging to him or used under his direction during construction, and in the event of his failure to do so, the same may be removed by the OWNER after ten (10) calendar days notice to the CONTRACTOR at the expense of the CONTRACTOR, and his surety or sureties shall be liable therefore.
As part of the final clean-up, the CONTRACTOR shall dress up and grade the right of way to match existing ground surfaces, and shall remove therefrom all weeds and other growth.
Where the construction has crossed yards or driveways, they shall be restored to a condition equivalent to the condition existing prior to the construction as determined by the ENGINEER.
No direct payment will be made to the CONTRACTOR for any clean-up work, but all compensation therefore shall be included in the prices BID in the schedule for the various items of work.
1-41 UNFAIR BUSINESS PRACTICES CLAIMS; ASSIGNMENT TO AWARDING BODY - In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the CONTRACTOR or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract: This assignment shall be made and become effective at the time the awarding body tenders final payment to the CONTRACTOR, without further acknowledgment by the parties.
1.18 1-42 CONSTRUCTION RECORD DRAWINGS - The CONTRACTOR shall maintain a neatly marked set of record drawings showing the final locations and layout of all piping and conduit, structures, and other facilities. Drawings shall be kept current weekly, in full accordance with and showing all field instructions, change orders and construction adjustments. Drawings shall indicate location of subgrade structures left in place.
Drawings shall be subject to the inspection of the ENGINEER at all times and progress payments may be withheld if drawings are not current. At the final inspection the CONTRACTOR shall submit to the inspector, for review and comment by the ENGINEER, one (1) set of marked record drawings. Drawings shall be stamped “AS BUILT”, dated, and signed by the CONTRACTOR. The work will not be formally accepted until the drawings are accepted by the ENGINEER.
1-43 STATE LABOR STANDARDS PROVISIONS - State prevailing wage rates shall apply when the State wage rate is higher than the federal wage rate. All CONTRACTORS and SUBCONTRACTORS are subject to the application of Section 1720 et seq. of the California Labor Code which details the regulations and procedures governing the payment of State prevailing wages.
All CONTRACTORS and SUBCONTRACTORS are subject to the provisions of Section 3700 of the California Labor Code which requires that every employer be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of the code.
All CONTRACTORS and SUBCONTRACTORS are subject to the provisions of Section 1810-1814 of the California Labor Code which provide that the maximum hours a worker is to be employed is limited to eight (8) hours a day and forty (40) hours a week and the CONTRACTOR or SUBCONTRACTOR shall forfeit, as a penalty, twenty-five ($25) dollars for each worker employed in the execution of the Contract for each calendar day during which a worker is required or permitted to labor more than eight (8) hours in any calendar day or more than eight (8) hours in any calendar day or more than forty (40) hours in any calendar week and is not paid overtime.
Section 1815 of the California Labor Code requires that, not withstanding the provision of Sections 1810-1814, employees of CONTRACTORS who work in excess of eight (8) hours per day and forty (40) hours per week shall be compensated for all hours worked in excess of eight hour per day at not less than 1-1/2 times the basic rate of pay. 1-44 PAYROLL RECORDS - Each CONTRACTOR and SUBCONTRACTOR shall keep an accurate payroll record showing the name, address, Social Security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed by him in connection with the WORK. Such records shall be certified and available for inspection at all reasonable hours at the principal office of the CONTRACTOR as required by Labor Code Section 1776. Certified payrolls shall be submitted to OWNER weekly. Fringe benefit statements and apprenticeship agreements will be submitted with the project’s first certified payroll or when there are mandated changes in the fringe benefits or when new apprentices are employed.
1-45 OVERTIME INSPECTION FEES - The CONTRACTOR shall pay CITY for all overtime inspection in accordance with existing resolutions or fee schedule of the CITY unless the charges for such inspection have been specifically waived elsewhere within this Contract.
Overtime inspection charges will be made for all inspections on Saturdays, Sundays, and
1.19 CITY-designated holidays, and hours worked by the inspector other than those of the normal CITY working day.
1-46 CLAIMS FOR ADDITIONAL TIME - Extension of time, when granted, will be based upon the effect of delays to the WORK as a whole and will not be granted for non-controlling delays to minor included portions of the WORK unless it can be shown that such delays did, in fact, delay the progress of the WORK as a whole. The CONTRACTOR shall not be entitled to damages or additional payment due to these delays except when CITY is responsible and the delay is unreasonable under the circumstances involved, and not within the contemplation of the parties. No compensation for WORK delays prior to the original Contract duration shall be paid.
If delays are caused by unforeseen events beyond the control of the CONTRACTOR, such delays will entitle the CONTRACTOR to an extension of time as provided herein. War, governmental regulations, priorities, labor disputes, strikes, fires, floods, adverse weather necessitating cessation of WORK, other similar action of the elements, inability to obtain materials, equipment or labor because of Federal Government restrictions arising out of the National Defense or War Program, required "Extra Work”, action or inaction by the CITY, or other specific reasons as may be further described in the Specifications may constitute such a delay.
If the CONTRACTOR is delayed by the failure of the CITY to furnish necessary rights of way or materials agreed to be furnished by it, or by failure to supply necessary plans or instructions concerning the WORK, after written request therefore, the CONTRACTOR shall be entitled to an extension of time as provided herein. 1-47 RECYCLING - The City of Madera encourages all CONTRACTORS, SUBCONTRACTORS, vendors and suppliers to recycle in accordance with current industry best practices and as required by the State of California recycling of construction materials.
All asphalt concrete to be removed shall be removed by grinding and the grindings shall become City-Owned Material and shall be hauled to the Talley Sand & Gravel at 12483 Road 29, Madera, California, and dispose of at that location as specified by the Engineer.
Construction and demolition debris generated under a city issued building, renovation, or demolition permit and equal to or exceeding eight cubic yards of material by volume shall have necessary mixed and/or source separated C&D recycling bin(s) or roll-off boxes for the removal and recycling of all construction and demolition debris from the project site. The project permittee, designated hauler, or recycler shall provide to the City of Madera a monthly C&D report which contains at a minimum the construction site address, weight of material hauled, date hauled, material type, recycling facility name and address, and assurances from the recycling facility that a minimum of 50% of the C&D material has been recycled.
The city will provide the proper documentation form: however, other forms of documentation can be used as long as it is deemed by city staff to be acceptable and complete. See appendix for debris management report.
1-48 COLLECTION, TRANSPORT OF ALL CONSTRUCTION AND DEMOLITION DEBRIS - The City of Madera requires all Contractors, Subcontractors, vendors and suppliers to utilize Mid Valley Disposal for collection, transportation, and reporting of all construction and demolition debris.
Attachment J
Section 2, Special Conditions
SECTION 2
SPECIAL CONDITIONS
PAGE INTENTIONALLY LEFT BLANK
2.1 SECTION 2
SPECIAL CONDITIONS
2-1 REQUIREMENTS - It is required that there be constructed and completed in accordance with “WIDENING AND INTERSECTION IMPROVEMENTS – OLIVE AVENUE AND KNOX STREET”
2.2 DESCRIPTION OF THE WORK - The principal components of the WORK to be performed under these CONTRACT DOCUMENTS included but are not limited to the following:
The work in general consists of widening and intersection improvements to Olive Avenue and Knox Street, to Arterial Street standards, including: concrete curbs, gutters, sidewalk and ADA ramps, installation of sewer manhole, installation of water mains and service, fire hydrants, and installation of storm drain pipelines and drainage structures. Street construction includes removal of existing pavements, grading of roadway subgrade, placing aggregate base, and asphalt concrete paving. Also included is the installation of traffic signals, installation of streetlight and electrical systems, and installation of electrical meter for street lighting.
2-3 LABOR - If any SUBCONTRACTOR or person employed by the CONTRACTOR shall appear to the ENGINEER to be incompetent or to act in a disorderly or improper manner, they shall be removed immediately on the request of the ENGINEER, and that person shall not again be employed on the work.
No person whose age or physical condition is such as to make his employment dangerous to his health and safety or to the health and safety of others shall be employed on the work, and in no event shall any person under the age of sixteen (16) years be employed.
The work shall at all times be executed under safe working conditions, and the conditions of work shall be subject to inspection and correction by the ENGINEER or safety inspectors of the OWNER.
2-4 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK - The CONTRACTOR shall commence WORK and shall complete all of the WORK in accordance with the schedule and within the time stated in the BID. The capacity of the CONTRACTOR's construction plant, sequence of operations, method of operations, and the forces employed shall, at all times during the continuance of the Contract, be subject to the approval of the ENGINEER and shall be such as to ensure the completion of the WORK in accordance with the required schedule and within the time specified. 2-5 SCHEDULE OF WORK - The CONTRACTOR shall submit a schedule of work for the improvements for review at the pre-construction meeting. This schedule shall indicate the date the CONTRACTOR will obtain any and all permits from outside agencies, including a permit from the Division of Industrial Safety for any excavation five (5) feet or more in depth. This schedule shall show all items of work and expected construction times for each item. This schedule shall be revised every two (2) weeks as required and submitted to the ENGINEER. The ENGINEER may withhold progress payments for failure of the CONTRACTOR to submit a schedule of work.
2.2 2-6 SEQUENCE OF WORK - The CONTRACTOR shall schedule work with the utmost diligence and execute the work expeditiously so as to minimize public inconvenience. 2-7 RESPONSIBILITY REGARDING EXISTING UTILITIES AND PRIVATE PROPERTY - The existence and location of public and private utilities indicated on the DRAWINGS are not guaranteed and any additional utilities and facilities not shown on the DRAWINGS shall be investigated and protected by the CONTRACTOR. The CONTRACTOR shall be held responsible for damage to and for maintenance and protection of existing pipelines, irrigation facilities, public utilities, driveways, alleys, sidewalks, curbs and gutters, and existing fences.
Excavation in the vicinity of existing public utility structures, underground electrical or telephone cable, oil or gas pipelines, and waterlines shall be carefully done by hand. The CONTRACTOR shall adequately protect all adjoining property and structures from damage, whether within or without of the OWNER-furnished rights-of-way, and shall be fully responsible for any damage to adjoining property and structures which may result from WORK done under this Contract. Unless otherwise provided, the CONTRACTOR shall repair or replace all existing improvements (e. g. curbs, sidewalks, driveways, fence, signs, utilities, street surfaces, structures, sprinkler, etc.) damaged or removed as a result of his operations. Repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension, whether within the right-ofway or on private property. All repairs and replacements for items on private properties shall be made within seven (7) calendar days.
All costs to the CONTRACTOR for protecting, removing and restoring existing improvements shall be included in the various bid items and no separate payment will be made therefore.
It shall be the CONTRACTOR’s responsibility to notify the Underground Service Alert (USA) Organization for utility undergrounding permits per Section 4216 of the Government Code. The CONTRACTOR shall obtain all identification numbers and certifications required for underground utility locations prior to starting excavation within the project limits of work. The USA North’s - Underground Service Alert phone number is 811/1-800-227-2600.
The CONTRACTOR shall use extreme care during construction to prevent damage from dust to adjacent property. The CONTRACTOR shall sprinkle the areas where the passage or operation of vehicles and equipment creates a dust problem, or take other preventive measures as directed by the ENGINEER. The CONTRACTOR shall furnish all labor, equipment, materials and means required to control dust which is in any way a result of the CONTRACTOR’S operations.
The CONTRACTOR shall be responsible for all damage or injury which may result to property, outside of the construction right-of-way or within the right-of-way where so noted, from the CONTRACTOR’S operations hereunder, or otherwise, from the performance of this Agreement or failure of performance of this Agreement by said CONTRACTOR or any of his subcontractors or employees.
2-8 PROJECT SITE MAINTENANCE - Throughout all phases of construction, including suspension of work, and until final acceptance of the project, the CONTRACTOR shall keep the work site clean and free from rubbish and debris. The CONTRACTOR shall also abate dust nuisance by cleaning, sweeping and sprinkling with water or other means as necessary.
2.3 CONTRACTOR shall maintain site in accordance with the City of Madera NPDES Permit for their storm drainage system. Copy of said permit is available at the office of the City of Madera ENGINEER.
Materials and equipment shall be removed from the site as soon as they are no longer necessary. Upon completion of the work and before final inspection, the entire work site shall be cleared of equipment, unused materials and rubbish so as to present a satisfactory clean and neat appearance. All cleanup, dust control, and project site maintenance costs shall be absorbed in the CONTRACTOR’S bid. 2-9 NOTIFICATION - All homeowners and businesses affected by the construction shall be notified five (5) days in advance of the Work. The notification shall be in a form of a written posting, stating the time and date that the activities will take place. Should work not occur on the specified day, a new notification will be distributed. Suitable signs shall be posted 48 hours prior to the surfacing. “No Parking” signs shall include the wording, “Vehicle Code Section 22654”.
2-10 WATER SUPPLY - Water will be available to the CONTRACTOR for the performance of the WORK from assigned City fire hydrants. CONTRACTOR will be billed monthly for metered fire hydrant water. Prior to the use of any hydrant, the CONTRACTOR shall notify the Madera Public Works Department and a representative from the Public Works Department will install a meter furnished by the Public Works Department on the fire hydrant. It will be the CONTRACTOR'S responsibility to convey the water to the work site. Regardless of the method of conveyance chosen, it shall not be cause for closure of any streets nor shall it create a nuisance to nearby residents. The CONTRACTOR is responsible for security of the City-furnished meter. An air gap shall be maintained between the hose or pipe discharge to prevent possible backflow in the event of distribution system pressure loss. Payment of work specified above shall be included in the unit and lump sum prices bid in the schedule for the various items of WORK. See Appendix C for additional requirements.
2-11 MATERIALS FURNISHED BY OWNER - No labor, material, or other facilities shall be provided by the OWNER unless otherwise indicated on the DRAWINGS or in the SPECIFICATIONS.
2-12 MATERIALS FURNISHED BY CONTRACTOR - Unless otherwise stipulated, the CONTRACTOR shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation, and other facilities necessary for the execution and completion of the WORK.
2-13 REQUEST FOR EXTENSION OF TIME - No extension of time shall be made for delay occurring more than seven (7) calendar days before a claim is made therefore in writing to the ENGINEER. In the case of a continuing cause of delay, only one claim is necessary.
2-14 RIGHTS-OF-WAY - The CONTRACTOR shall not be entitled to extra compensation for hardships and increased cost caused by the WORK being adjacent to telephone-telegraph lines and guide wires, power lines and guide wires, buildings, fences, pipelines, ditches, roadways, and other obstacles, which may physically restrict or limit the use of construction equipment. In some cases, such physical confinement may necessitate special methods of construction of the WORK. If the CONTRACTOR desires to utilize additional area, he shall obtain the necessary written approvals from the landowner.
2.4 No additional compensation shall be paid to the CONTRACTOR for the cost of obtaining additional right-of-way or for the inability to obtain such. 2-15 TRAFFIC CONTROL, CONSTRUCTION SIGNS, BARRICADES, AND LIGHTS 2-15.1 TRAFFIC SAFETY AND ACCESS - The CONTRACTOR’S operations shall cause no unnecessary inconvenience. The access rights of the public shall be considered at all times. A schedule of work shall be submitted to the ENGINEER for approval prior to the start of construction. CONTRACTOR shall immediately notify ENGINEER of any changes to the approved schedule.
The CONTRACTOR shall submit a traffic control plan to the ENGINEER for approval before the start of construction.
The CONTRACTOR shall backfill all trenches at the end of each working day. The CONTRACTOR shall place and compact backfill in trenches as required to obtain a stable foundation daily for traffic use. In paved areas, three (3) inches of “cold mix” asphalt concrete shall overlay the compacted backfill and be installed daily. Temporary paving work shall be completed to the satisfaction of the ENGINEER. A stockpile of “cold mix” asphalt concrete shall be kept at the project site. There shall be no exception to this requirement.
Public ingress-egress to all streets including driveway access for residences and businesses shall be maintained at all times.
Where necessary, the CONTRACTOR shall place ramps, temporary driveways or steel plates.
Work will not be permitted on Sundays. The CONTRACTOR must submit an application for Saturday work at least 7 (seven) days in advance of the Saturday in question.
Overtime expenses will be charged to the CONTRACTOR for approved Saturday work.
Before the CONTRACTOR commences work, he shall discuss with the ENGINEER his proposal for controlling access during the work.
All costs to the CONTRACTOR for complying with the provisions of this section shall be included in various bid items and no separate payment will be made. 2-15.2 PUBLIC SAFETY - The CONTRACTOR shall have at the work site copies or suitable extracts of Construction Safety Orders, Tunnel Safety Orders and General Industrial Safety Orders issued by the State Division of Industrial Safety. He shall comply with the provisions of these and all other applicable laws, ordinances and regulations. 2-15.3 TRAFFIC CONTROL - The CONTRACTOR shall be solely and completely responsible for furnishing, installing and maintaining all warning signs and devices, necessary to safeguard the general public and the work, and to provide for the proper and safe routing of the vehicular and pedestrian traffic during the performance of the work. This requirement shall apply continuously and not be limited to normal working hours. All traffic control devices left in use over-night shall be illuminated. Arrow boards will be required for lane closures. The CONTRACTOR shall submit a plan showing traffic control measures and/or detours for vehicles and pedestrians affected by the construction to the ENGINEER for review and approval. This plan shall be submitted a minimum of five (5) working days prior to the start of work within the street right-of-way.
The CONTRACTOR will not be allowed to begin work until an approved plan is on file
2.5 with the ENGINEER. Approval by the ENGINEER shall in no way relieve the CONTRACTOR from maintaining proper controls at all times. 2-16 STORAGE OF EQUIPMENT AND MATERIALS - Construction equipment shall not be stored in streets, roads or highways without obtaining the approval of the ENGINEER, and then not for more than five (5) days after unloading. All materials or equipment not installed or used in the construction within five (5) days after unloading shall be stored elsewhere by the CONTRACTOR at his expense unless he is authorized additional storage time. Construction equipment shall not be stored at the work site before its actual use on the work and not for more than five (5) days after it is no longer needed on the work. Time necessary for repair or assembly of equipment may be authorized by the ENGINEER.
2-16.1 STOCK PILE SITES - Any sites for stockpiling shall be clean and free of objectionable materials and shall be located outside the street right-of-way in a location identified by the ENGINEER. Arrangements for these sites shall be the responsibility of the CONTRACTOR. If on private property, a written agreement with the Owner shall be provided to the ENGINEER prior to commencing operations. 2-17 GENERAL PROVISIONS - The specification of any action or remedy that may be taken by the OWNER or the ENGINEER pursuant to the terms hereof for the failure of the CONTRACTOR to perform this Contract or for the breach hereof or for indemnity shall not be the exclusive action or remedy of the OWNER or the ENGINEER, but shall be cumulative with all other actions, rights, and remedies contained herein 2-18 CLEAN AIR ACT OF 1970 ET SEQ. AND FEDERAL WATER POLLUTION CONTROL ACTS AS AMENDED BY THE CLEAN WATER ACT OF 1977 - CONTRACTOR agrees to comply with Federal clean air and water standards during the performance of this Contract. The CONTRACTOR shall provide a Storm Water Pollution Prevention Plan (SWPPP) or a Water Pollution Control Program (WPCP) plan as is applicable for the project and shall be prepared and submitted for approval prior to the start of the work.