Cities Index.
Agenda packet

Madera City Council
November 5, 2025

Document
Agenda packet
Meeting
November 5, 2025
Body
Madera City Council
Pages
51
Original file
63.6 MB
Text extracted from the city's file for reading and search. Open the original on media-001-us.cdn.govstack.com. That file is the official record.

damage at least as broad as ISO Form CA 00 01 for all activities of Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles. Automobile Liability policies shall be endorsed to provide that the City and its officers, officials, employees, and agents shall be additional insureds under such policies.
 Worker’s Compensation as required by the State of California and $1,000,000 Employer’s Liability per accident for bodily injury or disease. Contractor shall submit to the City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City, its officers, agents, employees, and volunteers.
 Builder’s Risk (Course of Construction) insurance covering all risks of loss less policy exclusions equivalent to the completed value of the project with no coinsurance penalty provisions.

Contractor may submit evidence of Builder’s Risk insurance as evidence of course of construction coverage. Termination of coverage shall not occur prior to full completion of the applicable project. The City of Madera, its officers, officials, employees, and agents shall be named as loss payee. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission, or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures, and all other properties constituting a part of the Project; (4) transit coverage, including ocean marine coverage (unless insured by the supplier), with sub-limits sufficient to insure the full replacement value of any key equipment item; and (5) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site. Such insurance shall be on a form acceptable to City to ensure adequacy of terms and sub-limits.  $1,000,000 Professional Liability for design/build, if applicable.

Maintenance of Coverage
Contractor shall procure and maintain, for the duration of the contract, insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, his agents, representatives, employees, subcontractors or subconsultants as specified in this Agreement.

Proof of Insurance
Contractor shall provide to the City certificates of insurance and endorsements, as required, as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by the City prior to commencement of performance. Current evidence of insurance shall be kept on file with the City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time.

Acceptable Insurers
All insurance policies shall be issued by an insurance company currently authorized by the Insurance commissioner to transact business of insurance in the State of California, with an assigned policyholders’ Rating of A- (or higher) and a Financial Size Category Class VII (or larger), in accordance with the latest edition of Best’s Key Rating Guide.

Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City, its elected or appointed officers, agents, officials, employees, and volunteers, or shall specifically allow Contractor, or others providing insurance evidence in compliance with these IFB 202425-22B James Taubert Park Construction Rebid

Page 49 of 51 ends

specifications, to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City and shall require similar written express waivers and insurance clauses from each of its subconsultants or subcontractors.

Enforcement of Contract Provisions (non estoppel)
Contractor acknowledges and agrees that any actual or alleged failure on the part of the Agency to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City, nor does it waive any rights hereunder.

Specifications not Limiting
Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If Contractor maintains higher limits than the minimums required above, the entity shall be entitled to coverage at the higher limits maintained by Contractor.

Notice of Cancellation
Contractor agrees to oblige its insurance agent or broker and insurers to provide to the City with thirty (30) calendar days’ notice of cancellation (except for nonpayment for which ten (10) calendar days’ notice is required) or nonrenewal of coverage for each required coverage.

Self-insured Retentions
Any self-insured retentions must be declared to and approved by the City. The City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the City’s Risk Manager.

Timely Notice of Claims
Contractor shall give the City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.

Additional Insurance
Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgement may be necessary for its proper protection and prosecution of the Work.

IFB 202425-22B James Taubert Park Construction Rebid

Page 50 of 51 ends

Construction Services Agreement
Exhibit F - IFB 202425-22B James Taubert Park Construction Rebid Invitation for Bid
No. 202425-22B
FOR
James Taubert Park Construction Rebid
Date Released: August 8, 2025
City of Madera
Parks and Community Services Division
Bids are due prior to 4:00pm on September 8, 2025
Table of Contents
NOTICE OF INVITATION FOR BID.........................................................................................................................4 Introduction ....................................................................................................................................................... 4 Description of Work ........................................................................................................................................... 4 Bid Submittal Date (Close date)..........................................................................................................................4 How and Where to Submit.................................................................................................................................4 Bidder Questions................................................................................................................................................ 5 Pre-Bid Meeting ................................................................................................................................................. 5 Required Contractors Licenses ...........................................................................................................................5 Disadvantaged Business Enterprise (DBE) ..........................................................................................................6 Bonding Requirements....................................................................................................................................... 6 Prevailing Wages................................................................................................................................................ 6 Bid Protest Procedures....................................................................................................................................... 7 Scope of Work.................................................................................................................................................... 8

1. General Requirements.....................................................................................................................8

2. Site Preparation................................................................................................................................8

3. Infrastructure Development............................................................................................................8

4. Amenities Construction....................................................................................................................8

5. Landscaping ......................................................................................................................................8

6. Special Features (if applicable)........................................................................................................9

7. Finalization and Close-Out...............................................................................................................9 Description of Bid Items.....................................................................................................................................9 Bidder Checklist................................................................................................................................................ 20 Bid Proposal Form ............................................................................................................................................ 21 Bid Schedules A through L, Base Bid................................................................................................................. 22 Bid Schedules M through N, Add Alternates..................................................................................................... 29 Signature Page ................................................................................................................................................. 31 Subcontractor Listing........................................................................................................................................ 32 Certification ..................................................................................................................................................... 33 Noncollusion Affidavit...................................................................................................................................... 34 Public Contract Code ........................................................................................................................................ 35 Debarment and Suspension Certification.......................................................................................................... 36 California Air Resources Board (CARB) Off-Road Diesel Fleet Compliance (DOORS Certification)..................... 37 Equal Employment Opportunity Certification ................................................................................................... 38 Disclosure of Conflict-of-Interest...................................................................................................................... 39 Bid Bond........................................................................................................................................................... 40 Payment Bond.................................................................................................................................................. 41 Performance Bond ........................................................................................................................................... 43 Standard Specifications And Plans.................................................................................................................... 45 General and Special Conditions........................................................................................................................ 45 Information for Bidders.................................................................................................................................... 46 Insurance Requirements for Contractors.......................................................................................................... 48 Attachments..................................................................................................................................................... 51

NOTICE OF INVITATION FOR BID
Invitation for Bid (IFB) No. 202425-22B
James Taubert Park Construction Rebid
Introduction
Pursuantto California Public Contract Code (PCC) §22000 etseq.,the City of Madera (“City”) hereby seeks bids in response to thisInvitation for Bid No. 202425-22B for the James Taubert Park Construction Rebid.

A contract will be awarded to the lowest responsive, responsible bidder based on the base bid amount.

Add alternates may be added upon contract award as budget allows and at the City’s discretion.

Description of Work
The City of Madera is seeking qualified contractors to submit bids for the construction of a new public park, James Taubert Park, located at 1280 E. Olive Avenue, Madera, CA 93638. The park will be about 0.46 acre. The scope of work includes, but is not limited to:
• Demolition and Site Preparation
• Providing Site Amenities & Features
• Site Utilities
• Concrete
• Playground Equipment & Installation
• Surfacing
• Shade Structures
• Planting & Irrigation
• Drainage
The project must be completed within 180 calendar days from the issuance of the Notice to Proceed. All work shall be performed per the specifications and plans provided by the City and in accordance with applicable building codes.

The Engineer’s Opinion of Cost for this project is $1,340,000.

Bid Submittal Date (Close date)
Bids must be received no later than 4:00pm on September 8, 2025.

How and Where to Submit
Electronic bids will be accepted on City bid forms provided by the City, until the time and date listed below.

In the event this Invitation for Bid is obtained through any means other than the City’s distribution, the City may deem bid non-responsive.

All bids must be submitted through the City’s PlanetBids vendor portal at https://pbsystem.planetbids.com/portal/54016/portal-home.

IFB 202425-22B James Taubert Park Construction Rebid

Page 4 of 51 ends

Bidder Questions
Any questions related to this IFB shall be submitted through the City’s PlanetBids vendor portal at https://pbsystem.planetbids.com/portal/54016/portal-home no later than 5:00pm on August 20, 2025.

No oral question or inquiry about this IFB shall be accepted. No questions or inquiries should be directed to any individual(s) at the locations detailed in this document. All communications must be submitted in writing per the process described in this document.

Pre-Bid Meeting
There is no pre-bid meeting for this project. Prior to submitting a bid, all contractors are encouraged to visit the work site in order to familiarize themselves with existing conditions.

Instructions to Bidders
You may view or obtain a copy of this Invitation for Bids (IFB) by visiting or contacting the following:

City of Madera PlanetBids Vendor Portal
Website: https://pbsystem.planetbids.com/portal/54016/portal-home Construction Bidboard (Ebidboard), Phone: 800-479-5314
Website: www.ebidboard.com
Dodge Data & Analytics, Phone: 877-784-9556
Website: www.construction.com
Placer County Contractors Association & Builders Exchange, Phone: 916-771-7229 Website: www.pccamembers.com
Builders’ Exchange of San Joaquin, Phone: 209-478-1000
Website: http://www.bxsj.org
Central California Builders Exchange, Phone: 559-237-1831 Website: http://cencalbx.com/
Valley Builders Exchange. Phone: (209) 522-9031
Website: www.valleybx.com
Required Contractors Licenses
Each Bidder shall be a licensed contractor pursuant to the California Business and Professions Code §7028.15 and California Public Contract Code §3300 and shall be licensed in the following classification as required by the scope of work: Class A, General Engineering Contractor. Any Bidder not meeting the license requirement(s) following the bid opening will be rejected as nonresponsive. All Bidder’s license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract.

Per Labor Code §1771.1, a contractor or subcontractor is not qualified to bid on, be last in a bid proposal for, or perform work on this project unless registered and qualified under Labor Code §1725.5.

IFB 202425-22B James Taubert Park Construction Rebid

Page 5 of 51 ends

Disadvantaged Business Enterprise (DBE)
The City of Madera hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, DBE, Minority Business Enterprise, and Women-Owned Business Enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religious creed, sex, or national origin in consideration for an award.

The City hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era or on any other basis prohibited by law.

Bonding Requirements
Bid security required in the amount of ten (10) percent of the amount of the bid. Bid security must be in the form of cash, cashier's check, certified check, or a bid bond issued by an admitted surety insurer licensed by the California Department of Insurance and certified by the US Bureau of Fiscal Service to conduct business in the state of California. Bid securities shall accompany the bids. Bid securities shall be made in favor of the City of Madera.

Payment Bond equal to one hundred percent (100%) of Bid are required within 7 days of the Notice of Intent to Award on all projects valued at $25,000 and above.

Performance Bond equal to one hundred percent (100%) of Bid are required within 7 days of the Notice of Intent to Award on all projects valued at $100,000 and above.

All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure section 995.120.

Prevailing Wages
The project is a public works project subject to California Labor Code §1770 et seq., The Director of Industrial Relations has determined the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed, for each craft, classification or type of worker needed to execute this contract. Per Diem wages shall be deemed to include employer payments for health and welfare, pension, vacation, apprenticeship or other training programs, and similar purposes.

The California DIR Public Works Contractors website is: http://www.dir.ca.gov/PublicWorks/Contractors.html. Copies of the rates are on file with the City and are deemed included in this IFB.

Upon request, the City will make available copies to any interested party. The rate of prevailing wage for any craft, classification, or type of workmanship to be employed on this Project is the rate established by the applicable collective bargaining agreement which rate so provided is hereby adopted by reference and shall be effective for the life of this Agreement or until the Director of the Department of Industrial Relations determines that another rate be adopted. It shall be mandatory upon the selected contractor and on any subcontractor to pay not less than the said specified rates to all workers employed in the execution of this contract. Contractor shall post on site all required job site notices as prescribed by law or regulation.

IFB 202425-22B James Taubert Park Construction Rebid

Page 6 of 51 ends

Bid Protest Procedures
Any actual or prospective bidder, offeror, or contractor may protest an RFP/RFQual/IFB to the City’s Procurement Services Manager and/or Director of Financial Services by submitting a written appeal within five (5) working days of knowing or reasonably should have known the facts giving rise to the protest, sent via email to [email protected], or mail to Jennifer Stickman, 205 W. 4th Street, Madera, CA 93637, addressing specific issues such as bid contradictions or procurement errors. The Procurement Services Manager and/or Director of Financial Services have the authority to resolve such protests and will provide a written response within five (5) working days unless more time is needed; if the protester is unsatisfied, they may appeal to the City Manager within five (5) business days, and then to the City Council as a final appeal, where they may be heard. While protests generally halt solicitation proceedings, the City may proceed if the Procurement Services Manager and/or Director of Financial Services determine it's necessary to protect a substantial City interest, and to deter frivolous protests, those who file two (2) unsuccessful protests within twelve (12) months may face debarment from future bids.

IFB 202425-22B James Taubert Park Construction Rebid

Page 7 of 51 ends

Scope of Work
The City of Madera is soliciting bids for the complete construction of James Taubert Park at an undeveloped site located at 1280 E. Olive Avenue, Madera, CA 93638. The completed park is estimated to measure approximately 0.46 acres.

This project is made possible through the State of California – The Natural Resources Agency, Department of Parks and Recreation, Statewide Park Development and Community Revitalization Program of 2018 grant funding.

The scope of work will generally consist of general requirements, site preparation, infrastructure development, amenities construction, landscaping, and special features in accordance with this IFB and all attachments listed herein.

1. General Requirements
 Conduct all work in accordance with the project plans, specifications, and applicable codes and regulations, including ADA standards and environmental requirements.  Coordinate with the City’s project manager and other relevant stakeholders to ensure adherence to the project timeline.
 Obtain all necessary permits and inspections prior to the start of construction.  Implement site safety measures to protect workers, visitors, and adjacent properties throughout the construction process.

2. Site Preparation
 Clear and grade the site, including removal of debris, vegetation, and unsuitable materials.  Perform necessary excavation and backfilling for utilities, pathways, and building foundations.

3. Infrastructure Development
 Install utility connections, including water, electricity, and drainage systems, as per the project design.
 Construct pathways and fencing using specified materials.  Install an irrigation system to ensure coverage of landscaped areas.

4. Amenities Construction
Construct amenities and features as detailed in Description of Bid Items including but not limited to:
 Construct playground structures, including safety surfacing and borders.  Build and install picnic shelters, benches, and trash receptacles as specified in the design.  Install lighting fixtures.
 Construct sports courts (e.g., half basketball court, table tennis) with appropriate surfacing and equipment.

5. Landscaping
 Prepare soil and plant trees, shrubs, grasses, and other vegetation as per the landscape plan.  Install mulch, topsoil, and decorative elements to enhance aesthetic appeal.  Ensure proper operation of the irrigation system to support plant health.

IFB 202425-22B James Taubert Park Construction Rebid

Page 8 of 51 ends

6. Special Features (if applicable)
 Construct additional features such as designated public art mural walls.  Install signage, including park name sign and play area signs.

7. Finalization and Close-Out
 Conduct final inspections to ensure compliance with all specifications and standards.  Provide the City with as-built drawings and warranties for installed systems and equipment.  Address any punch list items identified during the final walkthrough.  Perform site cleanup, ensuring the park is ready for public use.

Description of Bid Items
The descriptions below are general descriptions and do not include estimated quantities. See plans and bid summary for estimated quantities. Actual numbers and quantities of symbols on plans prevail.

Bid Schedule A, Demolition & Site Preparation
Bid Item A.1 – Temporary Erosion & Sedimentation Control:

The lump sum price bid for this item shall include all costs for temporary erosion & sedimentation control measures and BMPs as indicated on the Drawings and specifications. The item also includes labor, materials, tools, equipment, and incidentals and for doing all the work required by the Drawings and Specifications, including but not limited to installation and removal, which is not specifically set forth in the Bid Form as a pay item.

Bid Item A.2 – Construction Fencing:

The lump sum bid for this item shall include all costs for construction fencing, labor, materials, tools, equipment, incidentals and for doing all the work, including but not limited to installation and removal from the site necessary for completion of the work.

Bid Item A.3 – Removal of Existing Fence:

The lump sum bid for this item shall include all costs for removal of existing fence. The item also includes labor, disposal, and other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item A.4 – Removal of Existing Low Walls:

The lump sum bid for this item shall include all costs for removal of existing low walls. The item also includes labor, disposal, and other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item A.5 – Site Preparation (Clearing, Grubbing & Disposal):

The lump sum bid for this item shall include all costs for vegetation removal, soil clearing, grubbing and removal. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item A.6 – Site Grading (Rough/Fine):

The square foot price bid for this item shall include all costs for rough grading and fine grading (grading of landscape areas to meet rim and invert elevations). Design grades in the plan set are based on raw cut/fill IFB 202425-22B James Taubert Park Construction Rebid

Page 9 of 51 ends

numbers not taking into account any shrinkage or swelling. The item also includes labor, equipment, materials and all other work required by the drawings and specifications which is not specifically set forth in the Bid Form as a pay item. It is anticipated that this site should balance., However, should any excess soil occur, the contractor shall notify the City and will need to off-haul to a location as directed by the City at a cubic yard rate as agreed upon prior to off-haul by both parties.

Bid Item A.7 – Misc. Removal, Trenching, and Replacement of Existing Asphalt Pavement:

The lump sum bid for this item shall include all costs for the removal, trenching, and replacement of existing asphalt pavement. The item also includes labor, disposal, and other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Schedule B, Site Amenities & Features
Bid Item B.1 – Custom Park Sign:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of the custom park sign in locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.2 – Benches:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of precast concrete benches in locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

1. Bid Item B.3 – Picnic Tables:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of precast concrete picnic tables in locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.4 – ADA Picnic Tables:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of ADA precast concrete picnic tables in locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.5 – Trash Receptacles:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of trash receptacles in locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.6 – Recycling Receptacles:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of recycling receptacles in locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the IFB 202425-22B James Taubert Park Construction Rebid

Page 10 of 51 ends

Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.7 – Table Tennis:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of a table tennis equipment at locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.8 – Drinking Fountain:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of drinking water fountains at locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.9 – Bike Racks:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of bike racks at locations indicated on the Drawings and Specifications and in locations indicated on the Drawings. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.10 – Pet Waste Station:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of dog relief stations at locations indicated on the Drawings and Specifications and in locations indicated on the Drawings. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.11 – Prop 68 Sign:

The unit price bid for this item shall include all costs for purchase, shipping and delivery to the project site of the Prop 68 sign in locations indicated on the Drawings and Specifications. The item also includes all materials needed for installation per the manufacturer’s recommendations and as required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.12 – Basketball Hoop, Backboard & Post:

The unit price bid for this item shall include all costs for purchase, shipping and installation of basketball hoop, backboard, and post, along with forming, excavation, footings, pouring and finishing of the concrete footing in the location indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.13 – 4’ High Steel Fence:

The linear foot price bid for this item shall include all costs for purchase, shipping and installation of 4’ high perimeter fencing and hardware, forming, excavation, footings, pouring and finishing of concrete footings in locations indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

IFB 202425-22B James Taubert Park Construction Rebid

Page 11 of 51 ends

Bid Item B.14 – 4’ High x 8’ Wide Steel Fence Panel:

The linear foot price bid for this item shall include all costs for purchase, shipping and installation of 4’ high x 8’ wide fence panel and hardware, forming, excavation, footings, pouring and finishing of concrete footings in locations indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item B.15 – 6’ High Block Wall:

The linear foot price bid for this item shall include all costs for purchase, installation, forming, sub-grade reinforcement, aggregate base, footings, concrete additives and sealers, joints, stacked concrete masonry unit blocks with veneer finish on locations as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item. Contractor shall be responsible for coordinating the structural engineering package with the City prior to installation and securing applicable building permit/s.

Bid Schedule C, Site Utilities
Bid Item C.1 – Electrical System:

The lump sum bid for this item shall include all costs for purchase, shipping and installation of fully functioning electrical components for the recessed lighting at the custom park sign and pole lights in locations indicated on the Drawings and Specifications, including all junction boxes, conduits, footings, etc. required to ensure a fully functioning system. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item C.2 – 1” Water Line:

The linear foot price bid for this item shall include all costs for purchase, shipping and installation of a 1” water line for the drinking fountain in locations indicated on the Drawings and Specifications including connections to existing water lines. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item C.3 – 1” Water Meter:

The unit price bid for this item shall include all costs for purchase, shipping and installation of a 1” water meter for the drinking fountain in locations indicated on the Drawings and Specifications including connections to proposed and existing water lines. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item C.4 – 2” Irrigation Line:

The linear foot price bid for this item shall include all costs for purchase, shipping and installation of a 2” irrigation line for the irrigation system in locations indicated on the Drawings and Specifications including connections to existing water lines. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item C.5 – 1.5” Irrigation Meter:

The unit price bid for this item shall include all costs for purchase, shipping and installation of a 1.5” irrigation water meter for the irrigation system in locations indicated on the Drawings and Specifications including connections to existing water lines. The item also includes labor, materials and all other work IFB 202425-22B James Taubert Park Construction Rebid

Page 12 of 51 ends

required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Schedule D, Concrete
Bid Item D.1 – Concrete Flatwork:

The square foot price bid for this item shall include all costs for purchase, installation, concrete additives and sealers, pouring concrete pavement, finishing, joints, and joint sealants in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item D.2 – Offsite Concrete Flatwork at Sidewalk:

The square foot price bid for this item shall include all costs for purchase, installation, concrete additives and sealers, pouring concrete pavement, finishing, joints, and joint sealants in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item D.3 – Concrete Slab at Half Basketball Court:

The square foot price bid for this item shall include all costs for purchase, installation, concrete additives and sealers, pouring concrete pavement, finishing, joints, and joint sealants in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item D.4 – 12” Wide Concrete Mow Bands:

The linear foot price bid for this item shall include all costs for purchase, installation, concrete additives and sealers, reinforcement, pouring concrete, finishing, joints, and joint sealants in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item D.5 – Deepened Concrete Playground Curbs:

The linear foot price bid for this item shall include all costs for purchase, installation, concrete additives and sealers, reinforcement, pouring concrete curbs, finishing, joints, and joint sealants in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item D.6 – Deepened Concrete Edge at Playgrounds:

The linear foot price bid for this item shall include all costs for purchase, installation, concrete additives and sealers, reinforcement, pouring concrete curbs, finishing, joints, and joint sealants in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item D.7 – 12” Wide Concrete Mow Band (Under 4’ High Chain Link Fence):

The linear foot price bid for this item shall include all costs for purchase, installation, concrete additives and sealers, reinforcement, pouring concrete, finishing, joints, and joint sealants in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

IFB 202425-22B James Taubert Park Construction Rebid

Page 13 of 51 ends

Bid Item D.8 – Sub-grade Preparation:

The lump sum price bid for this item shall include all costs for soil preparation, sub-grade aggregate base material purchase, installation and compaction and forming of all concrete items described in concrete section 4 of these bid descriptions and in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Schedule E, Playground
Bid Item E.1 – Engineered Wood Fiber:

The cubic yard price bid for this item shall include all costs for purchase, delivery, installation, soil preparation, sub-grade material geotextile fabric and compaction of 12” deep wood fiber in the areas indicated on the Drawings. The item also includeslabor, equipment, materials, and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item E.2 – Playground Equipment:

The lump sum bid for this item shall include all costs for purchase, shipping, storage and installation of fully functional play equipment (manufactured and custom) to ensure compliance, sub-grade reinforcement, paint and paint preparation, forming, excavation, pouring and finishing of concrete footings in locations indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item E.3 – Sensory Play Panels:

The lump sum bid for this item shall include all costs for purchase, shipping, storage and installation of fully functional sensory play panels, sub-grade reinforcement, paint and paint preparation, forming, excavation, pouring and finishing of concrete footings in locations indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item E.4 – Concrete Playground Entry Ramp:

The unit price bid for this item shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals; for doing all work involved in procurement and installation of concrete entrance ramp at playground, including soil preparation, sub-grade material and compaction, concrete additives and sealers, forming, reinforcement, finish treatments, finishing, joints, and joint sealants in the areas indicated on the Drawings. The item also includes labor, equipment, and materials in the areas indicated on the Drawings, as specified in the Specifications and Plans.

Bid Schedule F, Surfacing
Bid Item F.1 – Basketball Court Striping:

The lump sum bid for this item shall include all costs for purchase, installation, and pouring surfacing in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

IFB 202425-22B James Taubert Park Construction Rebid

Page 14 of 51 ends

Bid Schedule G, Shade Structures
Bid Item G.1 – 22’x26’ Steel Shade Structure:

The lump sum price bid for this item shall include all costs for purchase, fabrication and installation of a fully functioning prefabricated shade structure in location indicated on the Drawings and Specifications.

The item also includes labor, materials (including footings), and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item. Contractor shall also be responsible for coordinating the structural engineering package with the City prior to installation and securing applicable building permit/s.

Bid Item G.2 – Fabric Overhead Shade Sails:

The lump sum price bid for this item shall include all costs for purchase, fabrication and installation of two fabric shade sail structures in locations indicated on the Drawings and Specifications. The item also includes labor, materials (include footings), and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item. Contractor shall also be responsible for coordinating the structural engineering package with the City prior to installation.

Bid Schedule H, On-Site Planting & Irrigation
Bid Item H.1 – Soil Conditioning & Amendments:

The square foot price bid for this item shall include all costs for soil testing, purchase and installation of fertilizers, fertilizer packs, organic material and soil conditioners as indicated by soil laboratory tests (by Contractor). The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item H.2 – (1) Gallon Shrubs:

The unit price bid for this item shall include all costs for purchase, delivery and installation of 1-gallon shrubs as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item H.3 – (15) Gallon Trees:

The unit price bid for this item shall include all costs for purchase, delivery and installation of 15-gallon trees and tree staking systems as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item H.4 – Turf (Hydroseed):

The square foot price bid for this item shall include all costs for purchase and installation of turf hydroseed, fertilizers, organic material and soil conditioners as indicated by soil laboratory tests (by Contractor) and establishment of turf (hydroseed) as indicated on planting plans, specifications, and details. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item H.5 – Tree Root Barriers:

The linear foot price bid for this item shall include all costs for purchase and installation of root barriers as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay IFB 202425-22B James Taubert Park Construction Rebid

Page 15 of 51 ends

item.

Bid Item H.6 – Decorative Organic Mulch:

The square foot price bid for this item shall include all costs for purchase and installation of organic mulch as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item H.7 – Irrigation System:

The square foot price bid for this item shall include all costs for purchase, delivery and installation of a fully functioning irrigation system including but not limited to; irrigation pipe, pipe sleeving, low flow irrigation, equipment, heads, nozzles, root watering systems, wires, remote control valves, irrigation controller, irrigation sub-water meter, backflow, master valves, flow sensors, and all other miscellaneous irrigation components as indicated on the Drawings and required in the field to ensure a fully functioning system. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item H.8 – Irrigation Booster Pump:

The lump sum price bid for this item shall include all costs for purchase, delivery and installation of a fully functioning irrigation booster pump and all other miscellaneous irrigation components as indicated on the Drawings and Specifications and required in the field to ensure a fully functioning system. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item H.9– Landscape Maintenance Period (120 Days):

The lump sum price bid for this item shall include all costs for maintaining installed landscape areas for a period of 120 days as indicated on the Drawings and Specifications as well as replacements for plants as needed. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Schedule I, Storm Drainage System
Bid Item I.1 – 4” Perforated Storm Drain Line
The linear foot price bid for this item shall include all costs for purchase, shipping and installation of a 4” perforated storm drain line in locations indicated on the Drawings and Specifications including connections to overflow, etc. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item I.2 – 6” Storm Drain Line
The linear foot price bid for this item shall include all costs for purchase, shipping and installation of a 6” storm drain line in locations indicated on the Drawings and Specifications including connections to storm drain inlets, storm drain manholes, etc. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

IFB 202425-22B James Taubert Park Construction Rebid

Page 16 of 51 ends

Bid Item I.3 – 8” Storm Drain Line
The linear foot price bid for this item shall include all costs for purchase, shipping and installation of an 8” storm drain line in locations indicated on the Drawings and Specifications including connections to storm drain inlets, storm drain manholes, etc. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item I.4 – 18” Storm Drain Line
The linear foot price bid for this item shall include all costs for purchase, shipping and installation of an 18” storm drain line in locations indicated on the Drawings and Specifications including connections to storm drain inlets, storm drain manholes, etc. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item I.5 – Storm Drain Manhole
The unit price bid for this item shall include all costs for purchase, shipping and installation of storm drain manholes in locations indicated on the Drawings and Specifications including connections to storm drain lines, etc. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item I.6 – Storm Drain Inlets, Bubble-Ups and Overflow Structures The lump sum price bid for this item shall include all costs for purchase, shipping and installation of storm drain inlets, bubble-ups and overflow structures in locations indicated on the Drawings and Specifications including connections to storm drain lines, etc. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item I.7 – Dry Well
The unit price bid for this item shall include all costs for purchase, shipping and installation of a dry well in locations indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item I.8 – Connect to Existing Storm Drain System
The unit price bid for this item shall include all costs for purchase, shipping and installation of connections to the existing storm drain system in locations indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Schedule J, Sanitary Sewer System
Bid Item J.1 – 4” Sanitary Sewer Line:

The lump sum bid for this item shall include all costs for purchase, shipping and installation of a fully functioning discharge system from the drinking fountains to the sumps in locations indicated on the Drawings including cleanouts and miscellaneous connections. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

IFB 202425-22B James Taubert Park Construction Rebid

Page 17 of 51 ends

Bid Item J.2 – 2’x6’ Sump (To Drinking Fountain):

The unit price bid for this item shall include all costs for purchase, shipping and installation of a 2’x6’ sump for the drinking fountain in locations indicated on the Drawings and Specifications including connections to sanitary sewer lines, etc. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Schedule K, Off-Site Planting & Irrigation
Bid Item K.1 – Soil Conditioning & Amendments:

The square foot price bid for this item shall include all costs for soil testing, purchase and installation of fertilizers, fertilizer packs, organic material and soil conditioners as indicated by soil laboratory tests (by Contractor). The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item K.2 – (1) Gallon Shrubs:

The unit price bid for this item shall include all costs for purchase, delivery and installation of 1-gallon shrubs as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item K.3 – Decorative Organic Mulch:

The square foot price bid for this item shall include all costs for purchase and installation of organic mulch as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item K.4 – Irrigation System:

The square foot price bid for this item shall include all costs for purchase, delivery and installation of a fully functioning irrigation system including but not limited to; irrigation pipe, pipe sleeving, low flow irrigation, equipment, heads, nozzles, root watering systems, wires, remote control valves, irrigation controller, irrigation sub-water meter, backflow, master valves, flow sensors, and all other miscellaneous irrigation components as indicated on the Drawings and Specifications and required in the field to ensure a fully functioning system. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item K.5– Landscape Maintenance Period (120 Days):

The lump sum price bid for this item shall include all costs for maintaining installed landscape areas for a period of 120 days as indicated on the Drawings and Specifications as well as replacements for plants as needed. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Schedule L, Miscellaneous
Bid Item L.1 – Mobilization/De-Mobilization (NTE 5%):

Mobilization and Demobilization will be paid for on a lump sum basis and is limited to 5% maximum of the total bid cost. The lump sum bid for this item shall include full compensation for conforming to these requirements, temporary fencing (prior to coordination & approval of City needed), labor, materials, tools, equipment, incidentals and for doing all the work involved in moving on and off the project site necessary IFB 202425-22B James Taubert Park Construction Rebid

Page 18 of 51 ends

for completion of the work on schedule.

Payment for (50) percent of Mobilization and Demobilization or 2.5% of Total Base Bid, whichever is less, shall be made at the time of the first progress payment after the Contractor has purchased and submitted the required bonds and insurance. The remaining amount shall be made at the time of the final progress payment after final project acceptance.

Bid Item L.2 – General Conditions (NTE 3%):

General Conditions will be paid for on a lump sum basis. The contract lump sum price paid for General Conditions shall include full compensation for conforming to these requirements, furnishing all the fees, permitting, bonding, labor, staking, surveying, and materials for doing all the work involved in administration and oversight of the project necessary for completion of the work as specified in the General Provisions, these Project Specifications and as directed by the Clients.

Bid Schedule M, Add Alternate No. 1
Bid Item M.1 - Alt-A Playground Safety Surfacing (Pour-in-Place Rubber Surface):

The square foot price bid for this item shall include all costs for purchase, installation, soil preparation, sub-grade compaction, aggregate base, geo-textile fabric, wear layer and cushion layer, adhesives, forming, reinforcement, pouring surfacing materials in the areas indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.

Bid Item M.2 - Alt-B DEDUCTIVE Engineered Wood Fiber. See Bid Item E.1.

Bid Item M.3 - Alt-C DEDUCTIVE Concrete Playground Entry Ramp. See Bid Item E.4.

Bid Schedule N, Add Alternate No. 2
Bid Item N.1 - Alt-D Sport Court Surfacing:

The square foot price bid for this item shall include all costs for specialty sport court surfacing in the areas as indicated on the Drawings and Specifications. The item also includes labor, materials and all other work required by the Drawings and Specifications which is not specifically set forth in the Bid Form as a pay item.
* * * * * * * * * * * * *
IFB 202425-22B James Taubert Park Construction Rebid

Page 19 of 51 ends

INCLUDE THIS PAGE WITH BID
Bidder Checklist
SUBMIT THIS BIDDER’S CHECKLIST WITH YOUR BID PROPOSAL. Bidders shall complete and submit all documents marked with an “X” in the “REQUIRED WITH BID SUBMITTAL” column for bids to be considered responsive.

If any Bidder makes any alteration, strike-through, or otherwise deviates from any of the bid forms provided herein or makes any qualifications of any of the required bid forms in separate documents submitted with the Contractor’s Bid Proposal, the Bid Proposal may be considered non-responsive.

REQUIRED WITH BID SUBMITTAL
[X] 1. BID PROPOSAL FORM
[X] 2. BID SCHEDULE A THROUGH N
[X] 3. SIGNATURE PAGE
[X] 4. SUBCONTRACTOR LISTING (In excess of 1/2 of 1%)
[X] 5. BID DEPOSIT (ELECTRONIC SCANNED COPY) attached to front of Proposal in the form of:
[ ] Certified Check [ ] Bidder’s Bond (submitted on form in this IFB) [ ] Cashier’s Check [ ] Irrevocable Letter of Credit
[ ] Certificate of Deposit
[X] 6. CERTIFICATION (Comptroller General’s List)
[X] 7. NONCOLLUSION AFFIDAVIT
[X] 8. PUBLIC CONTRACT CODE
[X] 9. DEBARMENT AND SUSPENSION CERTIFICATION
[X] 10. CALIFORNIA AIR RESOURCES BOARD (CARB) OFF-ROAD DIESEL FLEET

COMPLIANCE (DOORS CERTIFICATION)
[X] 11. EQUAL EMPLOYEMENT OPPORTUNITY CERTIFICATION
[X] 12. DISCLOSURE OF CONFLICT-OF-INTEREST FORM
[X] 13. ADDENDA – Signature page of all Addenda issued

SUBMIT NO SOONER THAN ELECTRONIC BID SUBMITTAL DATE AND TIME, AND NO LATER THAN 4:00 P.M. ON THE 3RD BUSINESS DAY AFTER BID OPENING:
[X] LETTER FROM BIDDER THAT BIDDER WILL PERFORM NOT LESS THAN 30% OF THE TOTAL NET BID AMOUNT (ORIGINAL CONTRACT PRICE), excluding specialty items designated by the City on the bid proposal to be submitted via email to [email protected] within three working days from the date of the bid opening.
[X] COMPLETE BID AND ALL REQUIRED FORMS AS UPLOADED TO PLANETBIDS (HARD COPY ORIGINAL delivered to ATTN: Jennifer Stickman, City of Madera, 205 East 4th Street, Madera, Ca 93637)
IFB 202425-22B James Taubert Park Construction Rebid

Page 20 of 51 ends

INCLUDE THIS PAGE WITH BID
Bid Proposal Form
James Taubert Park Construction Rebid, IFB 202425-22B
Bid proposal of ____________________________ (hereinafter called “BIDDER”), organized and existing under the laws of the State of _________________, doing business as (an individual), or (a partnership), or (a corporation), to the City of Madera (hereinafter called “OWNER”):

In compliance with your advertisement for Bids, BIDDER hereby proposes to perform all work required for “James Taubert Park Construction Rebid, IFB 202425-22B” in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below.

By submission of this BID, each BIDDER certifies, and in the case of a joint BID, each party thereto certifies as to his own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.

BIDDER hereby agrees to commence work under this Contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT in 180 (One hundred eighty) Calendar Days.

BIDDER further agrees to pay as liquidated damages, the sum of $1,000 for each consecutive calendar day thereafter, as provided in Section 1-17 of the General Conditions.

BIDDER acknowledges receipt of the following ADDENDA:

No. ______, dated ____________________, 2025
No. ______, dated ____________________, 2025
No. ______, dated ____________________, 2025
The undersigned, as BIDDER, declares that the only persons, or parties interested in this bid proposal as principals are those named herein; that this bid proposal is made without collusion with any other person, firm or corporation; that the BIDDER has carefully examined the location of the proposed work, the annexed proposed form of contract, and the plan therein referred to; and he proposes and agrees if this bid proposal is accepted, that the BIDDER will contract with the City of Madera to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the contract in the manner and time therein prescribed and according to the requirements of the OWNER as therein set forth, and that he will take in full payment therefor the following prices, to wit:

IFB 202425-22B James Taubert Park Construction Rebid

Page 21 of 51 ends

INCLUDE THIS PAGE WITH BID
Bid Schedules A through L, Base Bid
The following Bid Schedule lists the items necessary to complete the work. Bidder will fully complete the schedule including the total price of each item. If the total cost of any item or the Total Base Bid is inconsistent with the unit cost, the unit cost shall prevail. Payment of each item will be based on the actual quantity, except for those items bid lump sum and those items that are noted as fixed quantities.

NOTE: FOR BID TO BE CONSIDERED VALID, ALL BID SCHEDULES (A THROUGH N) MUST BE INCLUDED IN YOUR BID.

BID SCHEDULE A, DEMOLITION & SITE PREPARATION
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
A1 Temporary Erosion & Sedimentation Control LS 1
A2 Construction Fencing LS 1
A3 Removal of Existing Fence LS 1
A4 Removal of Existing Low Walls LS 1
A5 Site Preparation (Clearing, Grubbing &
Disposal) LS 1
A6 Site Grading (Rough/Fine) SF 20,117
A7 Misc. Removal, Trenching, and Replacement
of Existing Asphalt Pavement LS 1
TOTAL BID SCHEDULE A, DEMOLITION & SITE PREPARATION ITEMS A1 THROUGH A7 INCLUSIVE:
$_____________________.

Total Amount of BID SCHEDULE A, DEMOLITION & SITE PREPARATION (in words) is:
_________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 22 of 51 ends

INCLUDE THIS PAGE WITH BID

BID SCHEDULE B, SITE AMENITIES & FEATURES
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL

ITEM COST
B1 Custom Park Sign EA 1
B2 Benches EA 9
B3 Picnic Tables EA 2
B4 ADA Picnic Tables EA 2
B5 Trash Receptacles EA 2
B6 Recycling Receptacles EA 2
B7 Table Tennis EA 1
B8 Drinking Fountain EA 1
B9 Bike Racks EA 3
B10 Pet Waste Station EA 2
B11 Prop 68 Sign EA 1
B12 Basketball Hoop, Backboard & Post EA 1
B13 4' High Steel Fence LF 308
B14 4' High x 8' Wide Steel Fence Panel EA 3
B15 6' High Block Wall LF 206
TOTAL BID SCHEDULE B, SITE AMENITIES & FEATURES BID ITEMS B1 THROUGH B15 INCLUSIVE:
$__________________________
Total Amount of BID SCHEDULE B, SITE AMENITIES & FEATURES (in words) is:
_________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 23 of 51 ends

INCLUDE THIS PAGE WITH BID

BID SCHEDULE C, SITE UTILITIES
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL

ITEM COST
C1 Electrical System LS 1
C2 1" Water Line LF 39
C3 1" Water Meter EA 1
C4 2" Irrigation Line LF 10
C5 1.5" Irrigation Meter EA 1
TOTAL BID SCHEDULE C, SITE UTILITIES BID ITEMS C1 THROUGH C5 INCLUSIVE: $____________________

Total Amount of BID SCHEDULE C, SITE UTILITIES (in words) is:
_________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

BID SCHEDULE D, CONCRETE
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
D1 Concrete Flatwork SF 4,778
D2 Offsite Concrete Flatwork at Sidewalk SF 267
D3 Concrete Slab at Half Basketball Court SF 3,012
D4 12" Wide Concrete Mow Bands LF 255
D5 Deepened Concrete Playground Curbs LF 205
D6 Deepened Concrete Edge at Playgrounds LF 135
D7 12" Wide Concrete Mow Bands (Under 4' High Steel
Fence)
LF 220
D8 Sub-grade Preparation LS 1
TOTAL BID SCHEDULE D, CONCRETE ITEMS D1 THROUGH D8 INCLUSIVE:
$______________________
Total Amount of BID SCHEDULE D, CONCRETE (in words) is:
_________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 24 of 51 ends

INCLUDE THIS PAGE WITH BID

BID SCHEDULE E, PLAYGROUND
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
E1 Engineered Wood Fiber (incl. Aggregate Subbase) CY 171 E2 Playground Equipment LS 1
E3 Sensory Play Panels EA 5
E4 Concrete Playground Entry Ramp EA 1
TOTAL BID SCHEDULE E, PLAYGROUND BID ITEMS E1 THROUGH E4 INCLUSIVE:
$____________________
Total Amount of BID SCHEDULE E, PLAYGROUND (in words) is:
_________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

BID SCHEDULE F, SURFACING
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
F1 Basketball Court Striping LS 1
TOTAL BID SCHEDULE F, SURFACING BID ITEMS F1 INCLUSIVE:
$____________________
Total Amount of BID SCHEDULE F, SURFACING (in words) is:
_________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 25 of 51 ends

INCLUDE THIS PAGE WITH BID

BID SCHEDULE G, SHADE STRUCTURES
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
G1 22'x26' Steel Shade Structure LS 1
G2 Fabric Overhead Shade Sails LS 1
TOTAL BID SCHEDULE G, SHADE STRUCTURE BID ITEMS G1 THROUGH G2 INCLUSIVE:
$____________________
Total Amount of BID SCHEDULE G, SHADE STRUCTURES (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

BID SCHEDULE H, ON-SITE PLANTING & IRRIGATION
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
H1 Soil Conditioning & Amendments SF 7,225
H2 1 Gallon Shrubs EA 562
H3 15 Gallon Trees EA 21
H4 Turf (Hydroseed) SF 2,945
H5 Tree Root Barriers LF 348
H6 Decorative Organic Mulch SF 4,280
H7 Irrigation System SF 7,225
H8 Irrigation Booster Pump LS 1
H9 Landscape Maintenance Period (120 Days) LS 1
TOTAL BID SCHEDULE H, ON-SITE PLANTING & IRRIGATION ITEMS H1 THROUGH H9 INCLUSIVE:
$_____________________
Total Amount of BID SCHEDULE H, ON-SITE PLANTING & IRRIGATION (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 26 of 51 ends

INCLUDE THIS PAGE WITH BID

BID SCHEDULE I, STORM DRAINAGE SYSTEM
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
I1 4" Perforated Storm Drain Line LF 79
I2 6" Storm Drain Line LF 189
I3 8" Storm Drain Line LF 87
I4 18" Storm Drain Line LF 181
I5 Storm Drain Manhole EA 2
I6
Storm Drain Inlets, Bubble-Ups, and Overflow
Structures to Include:
(4) Storm Drain Inlets
(2) Bubble-Ups
(2) Overflow structures
LS 1
I7 Dry Well EA 1
I8 Connect to Existing Storm Drain System EA 1
TOTAL BID SCHEDULE I, DRAINAGE ITEMS I1 THROUGH I8 INCLUSIVE:
$______________________________
Total Amount of BID SCHEDULE I, DRAINAGE (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

BID SCHEDULE J, SANITARY SEWER SYSTEM
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
J1 4" Sanitary Sewer Line LF 6
J2 2'x6' Sump (To Drinking Fountain) EA 1
TOTAL BID SCHEDULE J, SANITARY SEWER SYSTEM ITEMS J1 THROUGH J2 INCLUSIVE:
$____________________________
Total Amount of BID SCHEDULE J, SANITARY SEWER SYSTEM (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 27 of 51 ends

INCLUDE THIS PAGE WITH BID

BID SCHEDULE K, OFF-SITE PLANTING & IRRIGATION
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
K1 Soil Conditioning & Amendments SF 1,235
K2 1 Gallon Shrubs EA 62
K3 Decorative Organic Mulch SF 1,235
K4 Irrigation System SF 1,235
K5 Landscape Maintenance Period (120 Days) LS 1
TOTAL BID SCHEDULE K, OFF-SITE PLANTING & IRRIGATION K1 THROUGH K5 INCLUSIVE:
$___________________________
Total Amount of BID SCHEDULE K, OFF-SITE PLANTING & IRRIGATION (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

BID SCHEDULE L, MISCELLANEOUS
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
L1 Mobilization/De-mobilization (NTE - 5%) LS 1
L2 General Conditions (NTE - 3%) LS 1
TOTAL BID SCHEDULE L, MISCELLANEOUS L1 THROUGH L2 INCLUSIVE:
$___________________________
Total Amount of BID SCHEDULE L, MISCELLANEOUS (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

GRAND TOTAL OF BID SCHEDULES A THROUGH L INCLUSIVE $__________________________________ GRAND TOTAL Amount of BID SCHEDULES A THROUGH L (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 28 of 51 ends

INCLUDE THIS PAGE WITH BID
Bid Schedules M through N, Add Alternates
BID SCHEDULE M, ADD ALTERNATE 1
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
M1 Alt-A Playground Safety Surfacing (Pour-in-Place
Rubber Surface)
SF 4,620
M2 Alt-B DEDUCTION Engineered Wood Fiber SF 171
M3 Alt-C DEDUCTION Concrete Playground Entry Ramp EA 1
TOTAL BID SCHEDULE M, ADD ALTERNATE 1, M1 THROUGH M3 INCLUSIVE:
$___________________________
Total Amount of BID SCHEDULE M, ADD ALTERNATE 1 (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

BID SCHEDULE N, ADD ALTERNATE 2
ITEM
NO. ITEM DESCRIPTION UNIT OF

MEASURE
APPROX
QTY
UNIT
COST
TOTAL
ITEM
COST
N1 Alt-D Sport Court Surfacing SF 3,012
TOTAL BID SCHEDULE N, ADD ALTERNATE 2, N1 INCLUSIVE:
$___________________________
Total Amount of BID SCHEDULE N, ADD ALTERNATE 2 (in words) is:
________________________________________ Dollars and ____________________________ Cents.

In case of discrepancy between words and figures, the words shall prevail.

IFB 202425-22B James Taubert Park Construction Rebid

Page 29 of 51 ends

INCLUDE THIS PAGE WITH BID
NOTE: FOR BID TO BE CONSIDERED VALID, ALL OPTIONS (1 THROUGH 4) MUST BE INCLUDED IN YOUR BID.

OPTION 1:

GRAND TOTAL OF BID SCHEDULES A THROUGH L INCLUSIVE $__________________________________ GRAND TOTAL Amount of BID SCHEDULES A THROUGH L (in words) is:
_________________________________________ Dollars and ____________________________ Cents. *************
OPTION 2:

GRAND TOTAL OF BID SCHEDULES A THROUGH L PLUS ADD ALTERNATE 1 INCLUSIVE $__________________________________
GRAND TOTAL of BID SCHEDULES A THROUGH L PLUS ADD ALTERNATE 1 (in words) is:
_________________________________________ Dollars and ____________________________ Cents. *************
OPTION 3:

GRAND TOTAL OF BID SCHEDULES A THROUGH L PLUS ADD ALTERNATE 2 INCLUSIVE $__________________________________
GRAND TOTAL of BID SCHEDULES A THROUGH L PLUS ADD ALTERNATE 2 (in words) is:
_________________________________________ Dollars and ____________________________ Cents. *************
OPTION 4:

GRAND TOTAL OF BID SCHEDULES A THROUGH L PLUS ADD ALTERNATE 1 AND ADD ALTERNATE 2 INCLUSIVE $__________________________________
GRAND TOTAL of BID SCHEDULES A THROUGH L PLUS ADD ALTERNATE 1 AND ADD ALTERNATE 2 (in words) is:
_________________________________________ Dollars and ____________________________ Cents. *************
IFB 202425-22B James Taubert Park Construction Rebid

Page 30 of 51 ends

INCLUDE THIS PAGE WITH BID
Signature Page
If this bid proposal shall be accepted and the undersigned shall fail to contract, as aforesaid, and to give the two bonds in the sums to be determined as aforesaid, with surety satisfactory to the Awarding Authority, with seven (7) days after the award of the contract, the Awarding Authorities, at its option, may determine that the BIDDER has abandoned the contract, and thereupon this bid proposal and the acceptance thereof shall be null and void, and the forfeiture of such security accompanying this bid proposal shall operate and the same shall be the property of the OWNER.

DATE

COMPANY NAME

STREET ADDRESS

CITY/STATE/ZIP

PHONE NUMBER
EMAIL

PERSON PREPARING BID
TITLE

SIGNATURE
CITY OF MADERA BUS. LIC. NO.

CA CONTRACTOR’S LIC. NO. & CLASS
DIR REGISTRATION NO. & WORK

CLASSIFICATION
Attest
(Seal if bid is by a corporation)
IFB 202425-22B James Taubert Park Construction Rebid

Page 31 of 51 ends

INCLUDE THIS PAGE WITH BID
Subcontractor Listing
The following named subcontractors(s) will perform with labor, or otherwise render services to the general contractor in or about the construction of the work or improvement in an amount in excess of one-half of one percent of the total BID presented herewith or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of one percent of the prime Contractor’s total BID. Use subcontractor’s business name style as registered with the License Board.

Name, location, and description of work as REQUIRED by
Section 4104 of the California Public Contract code.

Subcontractor:

Business Address:

CSLB No. & Classification:

DIR No. & Classification:

Item No. or Description of Work:

Dollar Amount or Percentage of Total Bid:

Subcontractor:

Business Address:

CSLB No. & Classification:

DIR No. & Classification:

Item No. or Description of Work:

Dollar Amount or Percentage of Total Bid:

Subcontractor:

Business Address:

CSLB No. & Classification:

DIR No. & Classification:

Item No. or Description of Work:

Dollar Amount or Percentage of Total Bid:

Subcontractor:

Business Address:

CSLB No. & Classification:

DIR No. & Classification:

Item No. or Description of Work:

Dollar Amount or Percentage of Total Bid:

Subcontractor:

Business Address:

CSLB No. & Classification:

DIR No. & Classification:

Item No. or Description of Work:

Dollar Amount or Percentage of Total Bid:

Duplicate this form as necessary.

IFB 202425-22B James Taubert Park Construction Rebid

Page 32 of 51 ends

INCLUDE THIS PAGE WITH BID
Certification
The Bidder certifies under penalty of perjury under the laws of the State of California that his/her business or the corporation is not listed on the Comptroller General's list of ineligible bidders/contractors.

The above Certification is part of the Bid Proposal. Signing this Bid Proposal on the signature page thereof shall also constitute signature of this Certification.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

IFB 202425-22B James Taubert Park Construction Rebid

Page 33 of 51 ends

INCLUDE THIS PAGE WITH BID
Noncollusion Affidavit
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) To the CITY of MADERA,
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Name of Bidder
Signature
Name
Title
Dated
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

IFB 202425-22B James Taubert Park Construction Rebid

Page 34 of 51 ends

INCLUDE THIS PAGE WITH BID
Public Contract Code
Public Contract Code Section 10285.1 Statement
In accordance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985) the Bidder hereby declares under penalty of perjury under the laws of the State of California that the Bidder has _____, has not _____ been convicted within the preceding three years of any offences referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any State or Federal antitrust law in connection with the bidding upon award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term “Bidder” is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.

Note. The Bidder must place a check mark after “has” or “has not” in one of the blank spaces provided above. The above Statement is part of the bid proposal.

Public Contract Code Section 10162 Questionnaire
In accordance with the Public Contract Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the Bidder, any officer, or any employee of the Bidder who has a proprietary interest in the Bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation.

Yes _____ No _____
If the answer is Yes, explain the circumstances in the following space.

Public Contract Code 10232 Statement
In accordance with Public Contract Section 10232, the Bidder, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court has been issued against the Bidder within the immediately preceding two (2) year period because of the Bidder’s failure to comply with an order of a federal court which orders the Contractor to comply with an order of National Labor Relations Board.

Note: The above Statement and Questionnaire are part of the bid proposal. Signing this bid proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false Certification may subject the certifier to criminal prosecution.

IFB 202425-22B James Taubert Park Construction Rebid

Page 35 of 51 ends

INCLUDE THIS PAGE WITH BID
Debarment and Suspension Certification
Title 49, Code of Federal Regulations, Part 29
The Bidder, under penalty of perjury under the laws of the State of California, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
 is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
 has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
 does not have a proposed debarment pending; and
 has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

Exceptions will not necessarily result in denial of award but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

The above Certification ispart ofthe Bid Proposal. Signing this Bid Proposalon the signature page thereof shall also constitute signature of this Certification.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

INCLUDE THIS PAGE WITH BID
IFB 202425-22B James Taubert Park Construction Rebid

Page 36 of 51 ends

California Air Resources Board (CARB) Off-Road Diesel Fleet Compliance (DOORS Certification) All contractors and subcontractors utilizing off-road diesel-fueled vehicles with 25 horsepower or greater, or most two-engine vehicles, on this public works project in California shall be in full compliance with the California Air Resources Board (CARB) In-Use Off-Road Diesel-Fueled Fleets Regulation (California Code of Regulations, Title 13, Section 2449 et seq.).

Effective January 1, 2024, prime contractors and public works awarding bodies are required to obtain and retain a fleet's valid Certificate of Reported Compliance from CARB's Diesel Off-Road Online Reporting System (DOORS) prior to awarding or entering into a contract for work on public works projects involving the use of such vehicles.

Bidders shall provide a copy of their firm's (and any proposed subcontractors') current and valid CARB "Certificate of Reported Compliance" for their off-road diesel fleet(s) with their bid proposal.

The City reserves the right to verify the authenticity and validity of all submitted Certificates of Reported Compliance through the CARB DOORS system at http://www.arb.ca.gov/doors/compliance_cert1.html or by contacting the CARB DOORS Hotline.

The awarded Contractor shall maintain continuous compliance with all CARB Off-Road Diesel-Fueled Fleets Regulations throughout the duration of the contract and shall provide updated Certificates of Reported Compliance to the City throughout the project annually, or upon request, to demonstrate continued compliance.

Failure to provide a valid Certificate of Reported Compliance, or to maintain ongoing compliance, may result in the rejection of the bid, termination of the contract, and/or other penalties as permitted by law.

Exemptions:

If a bidder believes their fleet or operations are exempt from these requirements under CARB regulations (e.g., emergency operations as defined in Title 13 California Code of Regulations Section 2449(c)(18)), they must provide detailed documentation and justification for such exemption with their bid proposal for review and approval by the City.

The Bidder must place a check mark after “Yes”, “No”, or “N/A” in one of the boxes provided below.

DOORS certification included with bid: o Yes o Exempt
o N/A (no applicable vehicles will be used for this project.

If the answer is Exempt, explain the circumstances in the following space.

INCLUDE THIS PAGE WITH BID
IFB 202425-22B James Taubert Park Construction Rebid

Page 37 of 51 ends

Equal Employment Opportunity Certification
The bidder ____________________________________________________________________, proposed subcontractor, hereby certifies that he has , has not , participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President’s Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.

Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)) and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts, which are subject to the equal opportunity clause.

Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.

The above Certification is part of the Bid Proposal. Signing this Bid Proposal on the signature page thereof shall also constitute signature of this Certification.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

IFB 202425-22B James Taubert Park Construction Rebid

Page 38 of 51 ends

INCLUDE THIS PAGE WITH BID
Disclosure of Conflict-of-Interest
YES* NO
1 Are you currently in litigation with the City of Madera or any of its agents?
2 Do you represent any firm, organization or person who is in litigation with the City of Madera?
3 Do you currently represent or perform work for any clients who do business with the City of Madera?
4 Are you or any of your principals, managers or professionals, owners or investors in a business which does business with the City of Madera, or in a business which is in litigation with the City of Madera? 5 Are you or any of your principals, managers, or professionals, related by blood or marriage to any City of Madera employee who has any significant role in the subject matter of this service? 6 Do you or any of your subcontractors have, or expect to have, any interest, direct or indirect, in any other contract in connection with this Project?
* If the answer to any question is yes, please explain in full below.

Explanation:

Signature

(name)

(address)

(city state zip)
□ Additional page(s) attached.

IFB 202425-22B James Taubert Park Construction Rebid

Page 39 of 51 ends

INCLUDE THIS PAGE WITH BID
Bid Bond
KNOWN ALL MEN BY THESE PRESENT, that we, the undersigned, ___________________________________ as Principal, and ___________________________ as Surety, are hereby held and firmly bound unto _____________________________ as Owner in the penal sum of ____________________________ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.

Signed, this _____ day of ____________________, 2025. The condition of the above obligation is such that whereas the Principal has submitted to _____________________________ a certain bid, attached hereto and hereby made a part hereof to enter into a contract in writing, for the “James Taubert Park Construction Rebid, IFB 202425-22B”

NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract attached hereto (properly completed in accordance with said Bid) and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid.

Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.

The Surety, for value received, hereby stipulates, and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension.

IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. (L.S.) By_____________________________________
Principal
Surety
By:
(Seal and Notarial Acknowledge of Surety)
IFB 202425-22B James Taubert Park Construction Rebid

Page 40 of 51 ends

Payment Bond
KNOW ALL MEN BY THESE PRESENTS: that
____________________________________________________________ (Name of Contractor)
____________________________________________________________ (Address of Contractor)
a ____________________________, hereinafter called Principal, and (Corporation, Partnership or Individual)
____________________________________________________________ (Name of Surety)
____________________________________________________________ (Address of Surety)
hereinafter call Surety, are held and firmly bound unto ____________________________________________________________ (Name of Owner)
____________________________________________________________ (Address of Owner)
hereinafter called OWNER, in the penal sum of __
______________ Dollars, ($____________) in lawful money of the United States, for the payment of which sum well and truly made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents, and also by the provisions of Part 2, Title 14, Chapter 2 of the California Code of Civil Procedure (Section 995.010, et seq.) and of Section 3247, et seq. of the California Civil Code.

THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the Owner, dated the __________ day of __________, 2025, a copy of which is hereto attached and made a part hereof for the construction of:
“James Taubert Park Construction Rebid, IFB 202425-22B” NOW, THEREFORE, if the Principal shall willingly, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be null and void: otherwise it shall remain in full force and effect.

IFB 202425-22B James Taubert Park Construction Rebid

Page 41 of 51 ends

PROVIDED FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the contract or to work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the contract or to the work or to the specifications.

PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

IN WITNESS WHEREOF, this instrument is executed in ________ counterparts, each one of which shall be deemed an original, this the __________ day of ______________, 2025.

ATTEST:_____________________________
Principal
______________________ BY: _____________________________(s) (Principal) Secretary
(Seal)
_______________________ __________________________
(Witness as to Principal) (Address)
_______________________
ATTEST:
________________________ __________________________
(Surety) Secretary (Surety)
(SEAL)
____________________________ BY: _______________________ Witness as to Surety Attorney in Fact
___________________________ ____________________________ (Address) (Address)
___________________________ ____________________________ NOTE: Date of Bond must not be prior to date of Contract. If Contractor is Partnership, all partners shall execute Bond.

IFB 202425-22B James Taubert Park Construction Rebid

Page 42 of 51 ends

Performance Bond
KNOW ALL MEN BY THESE PRESENTS: that
____________________________________________________________ (Name of Contractor)
____________________________________________________________ (Address of Contractor)
a ____________________________, hereinafter called Principal, and (Corporation, Partnership or Individual)
____________________________________________________________ (Name of Surety)
____________________________________________________________ (Address of Surety)
hereinafter call Surety, are held and firmly bound unto ____________________________________________________________ (Name of Owner)
____________________________________________________________ (Address of Owner)
hereinafter called OWNER, in the penal sum of __
______________ Dollars, ($____________) in lawful money of the United States, for the payment of which sum well and truly made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the Owner, dated the __________ day of __________, 2025, a copy of which is hereto attached and made a part hereof for the construction of:
“James Taubert Park Construction Rebid, IFB 202425-22B” NOW, THEREFORE, if the Principal shall willingly, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be null and void: otherwise it shall remain in full force and effect.

PROVIDED FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the contract or to work to be performed IFB 202425-22B James Taubert Park Construction Rebid

Page 43 of 51 ends

thereunder or the specifications accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the contract or to the work or to the specifications.

PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

IN WITNESS WHEREOF, this instrument is executed in ________ (number)
counterparts, each one of which shall be deemed an original, this the __________ day of ______________, 2025.

ATTEST:_____________________________
Principal
______________________ BY: _____________________________(s) (Principal) Secretary
(Seal)
_______________________ __________________________
(Witness as to Principal) (Address)
_______________________
ATTEST:
________________________ __________________________
(Surety) Secretary (Surety)
(SEAL)
____________________________ BY: _______________________ Witness as to Surety Attorney in Fact
___________________________ ____________________________ (Address) (Address)
___________________________ ____________________________ NOTE: Date of Bond must not be prior to date of Contract. If Contractor is Partnership, all partners shall execute Bond.

IFB 202425-22B James Taubert Park Construction Rebid

Page 44 of 51 ends

Standard Specifications And Plans
The City of Madera’s Standard Specifications are hereby referred to and incorporated herein as though set forth in full. The Standard Specifications and Standard Drawings are available online at https://www.madera.gov/home/departments/engineering/standard-drawings/, and click on Specifications or Drawings. These online specifications and drawings are the most current, approved issue.

General and Special Conditions
General and Special conditions are hereby referred to and incorporated herein as though set forth in full.

The General and Special Conditions are available by clicking this link or copying and pasting it into your web browser: https://www.madera.gov/wp-content/uploads/2024/04/General-Special-Conditions-forConstruction.pdf.

IFB 202425-22B James Taubert Park Construction Rebid

Page 45 of 51 ends

Information for Bidders

1. Attention of Bidders is especially directed to the specifications which, in addition to the bid proposal and these instructions, are basis for evaluation and will be part of any contract with the successful bidder. Any deviations from the specifications in this notice shall be proper reason for rejection of all or any part of the bid proposal.

2. The City recognizes its policy of providing equal opportunity to all qualified persons and reaffirms its commitment that there shall be no discrimination against qualified applicants, or employees on the basis of race, gender, color, national origin, religion, age, disability, sexual orientation, or marital status.

The City is an equal opportunity employer. The City, as well as its recipients, subrecipients, and contractors, will not discriminate in employment practices based on race, color, religious creed, ancestry, national origin, age, sex (includes sexual harassment), pregnancy (childbirth or related medical conditions), marital status, sexual orientation (heterosexuality, homosexuality and bisexuality), medical condition (cancer and genetic characteristics), mental or physical disability (includes HIV and AIDS), political affiliation/opinion, Veteran's status, or request for family medical leave. The City is committed to ensuring that the work environment of City employees and the work environment of employees and volunteers of recipients, subrecipients, and contractors of the City are free from discrimination, harassment, and retaliation. All efforts to provide equal opportunity in employment practices will be made on the basis of merit, efficiency, and fitness consistent with civil service and merit system principles. Discrimination is prohibited in all aspects of the employment process.

The City, as well as recipients, subrecipients, and contractors, will not discriminate in the delivery of services or benefits based on the above identified bases.

3. The City reserves the right to reject or accept any or all bid proposals or parts thereof, and to accept or reject the alternatives individually or jointly, for any reason.

4. The City reserves the right to consider any minor deviations from the specifications and determine the acceptance or rejection of such deviation.

5. The City reserves the right to modify this IFB at any time. In the event it becomes necessary to modify or revise the IFB, a written amendment or addenda issued by City’s Purchasing Division is the only method which should be relied on with respect to changes to the IFB.

Proposer is responsible for checking the City’s PlanetBids vendor portal prior to submitting a Proposal to determine if any amendments were made to the IFB. Documents, amendments, addenda, etc. will be posted to the City’s PlanetBids vendor portal at https://pbsystem.planetbids.com/portal/54016/portal-home.

Any questions related to this IFB shall be submitted through the City’s PlanetBids vendor portal no later than 5:00pm on _______________.

No verbal requests or requests made in any other format will be accepted.

IFB 202425-22B James Taubert Park Construction Rebid

Page 46 of 51 ends

6. Bid proposals will be evaluated by the City. If a bid proposal is found to be incomplete or not in compliance with the format required, it will not be submitted for evaluation. During the evaluation process, the City may find it beneficial to request additional information. Bids will be compared on the basis of the grand total of BID SCHEDULE A through BID SCHEDULE L. Award will be made to the lowest responsive, responsible bidder. Furthermore, the City retains the right, at its option, to award Add Alternate 1, Add Alternate 2, or any combination of these alternates, in addition to the base bid.

7. Any bid proposal may be withdrawn at any time prior to the hour fixed for the opening, provided that a request in writing executed by the Bidder, or his/her duly authorized representative, for the withdrawal of such bid proposal is filed with Purchasing. The withdrawal of a bid proposal shall not prejudice the right of a Bidder to file a new bid proposal prior to the time and date set for the opening. After the expiration of the time and date for receipt of bid proposals, a bid proposal may not be withdrawn or altered.

8. Bidder is responsible for fully acquainting itself with the conditions of the project site (which may include more than one site), as well as those relating to the construction and labor of the project, to fully understand the facilities, difficulties, and restrictions which may impact the cost or effort required to complete the project.

9. The City reserves the right to seek supplementary information from any Bidder at any time after official bid proposal opening and before the award. Such information will be limited to clarification or amplification of information asked in the original bid proposal.

10. Issuance of the IFB and receipt of bid proposals does not commit the City to award an agreement.

The City reserves the right to postpone the IFB process for its own convenience, to accept or reject any or all bid proposals received in response to this IFB, to negotiate with other than the selected company should negotiations with the selected company be terminated, or to cancel any section of this IFB. The City also reserves the right to apportion the award among more than one company.

11. The successful Bidder shall enter into a formal agreement with City which will be very similar in content to the Attachment C, Sample Construction Agreement which is provided for information purposes only and to help clarify City intent relevant to this IFB as well as general contract requirements of the City.

12. Bidder and its subcontractors performing work under this contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses, and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Contract Documents.

13. Prior to beginning any work or delivering any equipment or material to be furnished under this bid proposal, the Bidder shall secure the appropriate Business License from the City of Madera.

Business license information may be obtained by calling (559) 661-5408.

Any Federal or State of California License/Certification required to provide the services will be required.

IFB 202425-22B James Taubert Park Construction Rebid

Page 47 of 51 ends

A Class A, General Engineering Contractor license will be required. Insurance documentation in accordance with the Insurance Requirements for Contractors will also be required.

14. Bidder’s Proprietary Information: Upon award, all documents provided by the successful Bidder shall become public record. All documents provided by any Bidders, other than the successful Bidder, shall become public record in their entirety and subject to disclosure. This shall also include but is not limited to documents for projects for which all bid proposals are rejected and projects for which an award is not made for any reason. In the event that one or more bid proposals are returned to the bidding parties, it is the intent of the City that such documents shall not become public records of the City unless required by the California Public Records Act or other provisions of law.

15. It is the City's policy to encourage the purchase of supplies, services and equipment from vendors located within the boundaries of the City. Local vendors are sellers, vendors, suppliers, and contractors who maintain places of business located within the limits of the City and who have a current City of Madera business license. The local vendor outreach policy shall not apply to those Agreements where State or Federal law, or other laws or regulations preclude such a preference.

Contractors will, to the greatest extent feasible, attempt to incorporate local area businesses as subcontractors and suppliers. Contractors will, upon request, provide records showing the outreach efforts made to local businesses to demonstrate that they have made a reasonable effort to inform local businesses of the opportunity.

16. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the Project shall apply to the Contract throughout.

Insurance Requirements for Contractors
Without limiting Contractor’s indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide, and continuously maintain at its own expense during the term of the Agreement, and shall require any and all Subcontractors and Subconsultants of every Tier to obtain and maintain, policies of insurance of the type and amounts described below and in form satisfactory to the City.

Minimum Scope and Limits of Insurance
Contractor shall maintain limits no less than:
 $2,000,000 General Liability (including operations, products and completed operations) per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage, including without limitation, blanket contractual liability. Coverage shall be at least as broad as Insurance Services Office (ISO) Commercial General Liability coverage form CG 00 01.

General liability policies shall be endorsed using ISO forms CG 20 10 and CG 20 37 to provide that the City and its officers, officials, employees, and agents shall be additional insureds under such policies. The additional insured coverage under the Contractor’s policy shall be primary and noncontributory and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as CG 20 01 04 13.
 $1,000,000 Automobile Liability combined single limit per accident for bodily injury or property IFB 202425-22B James Taubert Park Construction Rebid

Page 48 of 51 ends

damage at least as broad as ISO Form CA 00 01 for all activities of Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles. Automobile Liability policies shall be endorsed to provide that the City and its officers, officials, employees, and agents shall be additional insureds under such policies.
 Worker’s Compensation as required by the State of California and $1,000,000 Employer’s Liability per accident for bodily injury or disease. Contractor shall submit to the City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City, its officers, agents, employees, and volunteers.
 Builder’s Risk (Course of Construction) insurance covering all risks of loss less policy exclusions equivalent to the completed value of the project with no coinsurance penalty provisions.

Contractor may submit evidence of Builder’s Risk insurance as evidence of course of construction coverage. Termination of coverage shall not occur prior to full completion of the applicable project. The City of Madera, its officers, officials, employees, and agents shall be named as loss payee. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission, or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures, and all other properties constituting a part of the Project; (4) transit coverage, including ocean marine coverage (unless insured by the supplier), with sub-limits sufficient to insure the full replacement value of any key equipment item; and (5) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site. Such insurance shall be on a form acceptable to City to ensure adequacy of terms and sub-limits.  $1,000,000 Professional Liability for design/build, if applicable.

Maintenance of Coverage
Contractor shall procure and maintain, for the duration of the contract, insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, his agents, representatives, employees, subcontractors or subconsultants as specified in this Agreement.

Proof of Insurance
Contractor shall provide to the City certificates of insurance and endorsements, as required, as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by the City prior to commencement of performance. Current evidence of insurance shall be kept on file with the City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time.

Acceptable Insurers
All insurance policies shall be issued by an insurance company currently authorized by the Insurance commissioner to transact business of insurance in the State of California, with an assigned policyholders’ Rating of A- (or higher) and a Financial Size Category Class VII (or larger), in accordance with the latest edition of Best’s Key Rating Guide.

Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City, its elected or appointed officers, agents, officials, employees, and volunteers, or shall specifically allow Contractor, or others providing insurance evidence in compliance with these IFB 202425-22B James Taubert Park Construction Rebid

Page 49 of 51 ends

specifications, to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City and shall require similar written express waivers and insurance clauses from each of its subconsultants or subcontractors.

Enforcement of Contract Provisions (non estoppel)
Contractor acknowledges and agrees that any actual or alleged failure on the part of the Agency to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City, nor does it waive any rights hereunder.

Specifications not Limiting
Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If Contractor maintains higher limits than the minimums required above, the entity shall be entitled to coverage at the higher limits maintained by Contractor.

Notice of Cancellation
Contractor agrees to oblige its insurance agent or broker and insurers to provide to the City with thirty (30) calendar days’ notice of cancellation (except for nonpayment for which ten (10) calendar days’ notice is required) or nonrenewal of coverage for each required coverage.

Self-insured Retentions
Any self-insured retentions must be declared to and approved by the City. The City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the City’s Risk Manager.

Timely Notice of Claims
Contractor shall give the City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.

Additional Insurance
Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgement may be necessary for its proper protection and prosecution of the Work.

IFB 202425-22B James Taubert Park Construction Rebid

Page 50 of 51 ends

Attachments
The following attachments are to be incorporated and
included as part of the CONTRACT DOCUMENTS for
IFB 202425-22B for the James Taubert Park Construction Rebid • Attachment A, Technical Specifications by O’Dell Engineering, 303 pages • Attachment B, Project Plan Sheets by O’Dell Engineering, 37 pages • Attachment C, Sample Construction Agreement, 18 pages • Attachment D, Draft Geotechnical Report by Crawford & Associates, Inc., 37 pages • Attachment E, Structural Calculations by Justin W. Capp, 37 pages IFB 202425-22B James Taubert Park Construction Rebid

Page 51 of 51 ends

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025
N.T.S.
·

JAMES TAUBERT PARK

SHEET INDEX

ABBREVIATIONS

PROJECT INFORMATION

LANDSCAPE IMPROVEMENT LIMITS

GENERAL NOTES

VICINITY MAP

COVER SHEET
CS
99 152
99 59
145
41 140

REFERENCE DRAWINGS
·
080525

GAS LINE LOCATION PER USA MARKINGS FUEL LINE TRENCH PATCH GAS LINE LOCATION PER USA MARKINGS STOP OLIVE AVENUE

DRAKE STREET
KNOX STREET PADRE AVENUE 15002 15003 15004 267.9 267.8 268.1 268.0 267.9 268.0 268.1 268.2 268.6 268.4 268.2 268.4 268.3 268.7 268.6 268.4 268.2 268.2 268.0 268.4 268.2 268.3 268.0 267.6 267.6 267.8 267.8 268.0 267.6 267.9 267.8 268.2 268.5 267.9 267.9 268.0 268.2 268.6 268.6 268.2 267.8 268.1 268.3 268.4 268.0 268.2 268.0 267.9 267.9 268.1 267.8 268.0 267.9 267.9 268.1 268.4 268.4 268.3 268.3 267.9 268.0 268.3 268.6 268.8 268.2 268.5 268.3 268.6 268.3 268.5 268.1 268.0 268.3 268.4 268.2 267.9 268.8 268.2 268.0 268.7 268.4 268.2 268.4 268.4 268.5 268.5 268.2 268.2 268.4 268.4 268.7 268.5 268.3 267.9 268.2 268.1 267.8 268.0 268.2 268.2 268.1 268.4 267.8 267.7 267.6 267.5 268.2 267.8 267.7 267.9 267.9 268.4 IRR WATER E 268.18 CONC 268.29 CONC 268.1 267.76 EP 267.88 AC 267.98 AC 268.17 AC 268.06 AC 267.82 AC 268.14 EP268.18 EP268.32 EP 268.2 267.9 268.13 EP 268.33 AC 268.3 268.4 268.4 268.6 ELEC LINE TRENCH PATCH 268.6 268.7 268.7 269.14 AC 269.10 AC 268.8 268.6 268.8 268.5 268.7 268.6 W268.5 268.6268.81 CONC 268.81 CONC 268.6 268.48 AC 268.4 268.64 CONC 268.74 CONC 268.8 GB 268.8 GB268.8 268.8 GB GB 266.8 266.8 267.1 267.1 W 267.2 267.6 266.9 267.0267.1 267.2
E 268.62 CONC WATER LINE IRRIGATION SLEEVE
268
268
268
268
268
268
268
268

SWL SWL
DYL
SWL
DWY
6' FCL
6' FCL 6' FCL 6' WMA
6' WMA
DYL
S SMH RIM 267.18 INV. 6" 264.34(NE)
INV. 6" 264.24(W)INV. 6" 264.24(S)
S SMH RIM 269.18 INV. 12" 261.63(W) INV. 12" 261.53(N) INV. 12" 261.43(E) D DMH RIM 269.27 INV. 24" 255.99(NE)
INV. 36" 252.22(S)INV. 30" 253.07(E)INV. 18" 258.29(W) 268.66 TC 268.17 FL 268.28 LIP 268.82 BOW 268.73 TC 268.27 FL 268.39 LIP 268.96 BOW 269.01 ACD 268.65 EP 269.04 ACD 268.64 EP 269.08 ACD 268.66 EP 269.14 ACD 268.70 EP 269.15 ACD 268.74 EP 269.32 ACD 268.96 EP 269.30 ACD 268.88 EP 266.57 TC 266.10 FL 266.18 LIP 266.69 BOW 266.67 TC 266.18 FL 266.32 LIP 266.75 BOW 266.71 TC 266.24 FL 266.34 LIP 266.81 BOW 266.81 TC 266.32 FL 266.42 LIP 266.87 BOW 266.82 TC 266.35 FL 266.44 LIP 266.88 BOW 266.89 TC 266.41 FL 266.51 LIP 266.96 BOW266.93 TC 266.44 FL 266.54 LIP 266.97 TC 266.48 FL 266.59 LIP 267.04 TC 266.58 FL 266.65 LIP 267.11 TC 266.65 FL 266.74 LIP 268.06 TC 267.58 FL 267.67 LIP 268.24 BOW 268.16 TC 267.73 FL 267.77 LIP 268.44 BOW 268.83 ACD 268.50 EP 268.42 FL 268.60 LIP 269.07 BOW 268.76 TC 268.30 FL 268.68 TC 268.20 FL 268.30 LIP 268.80 BOW 268.58 TC 268.11 FL 268.26 LIP 268.71 BOW 268.82 TC 268.36 FL 268.32 AC268.41 AC268.40 EP 268.46 EP 268.50 EP268.53 EP268.59 EP 268.66 EP268.76 EP268.73 EP268.30 AC 268.13 AC HORIZONTAL DATUM NORTH AMERICAN DATUM OF 1983 (NAD83). COORDINATE SYSTEM COORDINATES SHOWN HEREON ARE BASED ON THE CALIFORNIA COORDINATE SYSTEM OF 1983 (CCS83), ZONE III. VERTICAL DATUM NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). PROJECT BENCHMARK CITY OF MADERA BENCHMARK #23, TOP OF FIRE HYDRANT NUT, ON THE NORTH WEST CORNER OF OLIVE AVENUE AND SOUTH D STREET, 5' NORTH OF STREET SIGN. ELEVATION = 270.59 FEET (NAVD88) SITE BENCHMARK POINT 15002 SET CUT X IN CONCRETE ALONG THE EAST SIDE OF KNOX STREET, 224' SOUTH OF CENTER LINE OF OLIVE AVENUE, 65' SOUTH OF STREET LIGHT. ELEVATION = 268.272 FEET (NAVD88) DATUM EQUATION ELEVATIONS SHOWN ON THE IMPROVEMENT PLANS FOR THE "KNOX ST TO OLIVE AVE ROAD WIDENING PROJECT" ("KNOX-OLIVE PROJECT") ARE DERIVED FROM A SURVEY PREPARED BY OTHERS IN 2015. SAID ELEVATIONS APPEAR TO BE ON A DIFFERENT DATUM. DUE TO THE OVERLAP BETWEEN THE TWO PROJECTS, A DATUM EQUATION HAS BEEN DEVELOPED TO HELP RELATE THE INFORMATION ON THE TWO SETS OF DRAWINGS. THIS INFORMATION HAS NOT BEEN APPROVED OR ENDORSED BY THE PRODUCER OF THE 2015 SURVEY DELIVERABLES AND IS PRESENTED HERE FOR INFORMATIONAL PURPOSES ONLY. THE END USER IS ADVISED TO CONFIRM THIS INFORMATION BEFORE EMPLOYING IT. [ELEVATIONS ON THIS SURVEY] = [KNOX-OLIVE PROJECT ELEVATIONS] + 3.014 FEET OR [KNOX-OLIVE PROJECT ELEVATIONS] = [ELEVATIONS ON THIS SURVEY] - 3.014 FEET 1. THE FIELD WORK FOR THIS SURVEY WAS CONDUCTED IN SEPTEMBER 2022. 2. NO ATTEMPT WAS MADE TO IDENTIFY THE NATURE OF USE OF UNDERLYING LAND SHOWN HEREON. ANY POTENTIAL PAST USES, INCLUDING THOSE WHICH MAY HAVE RESULTED IN SIGNIFICANT ENVIRONMENTAL OR CULTURAL IMPACTS, WERE NOT ASSESSED BY THIS SURVEY. 3. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ON THIS SITE, IT IS ADVISED THAT ALL INVOLVED PARTIES REVIEW SECTION 8771 AND SECTION 8725 OF THE CALIFORNIA BUSINESS AND PROFESSIONS CODE, AND SECTION 605 OF THE CALIFORNIA PENAL CODE TO ENSURE THAT MONUMENT CONSERVATION HAS BEEN PROPERLY ADDRESSED. 4. NOTHING ON THIS SURVEY SHALL BE INTERPRETED IN A MANNER CONTRARY TO THESE STATEMENTS. 5. BOUNDARY LINES (STREET CENTERLINES, ROAD RIGHTS-OF-WAY, PARCEL LINES, EASEMENTS, SECTION LINES, ETC.) ARE PLOTTED FROM RECORD INFORMATION ONLY. SURVEY NOTES: CONTROL POINT TABLE POINT 15000 15002 15003 15004 NORTHING 1805633.87 1805342.44 1805215.84 1805439.51 EASTING 6695485.98 6695494.77 6695496.21 6695438.76 DESCRIPTION SET SCRIBED X SET SCRIBED X SET SCRIBED X SET RBR SURVEY ABBREVIATIONS AC ASPHALT CONCRETE CONC CONCRETE CR CROWN E,ELEC ELECTRIC (UTILITY) EP EDGE OF PAVEMENT FD FOUND FL FLOWLINE GB GRADE BREAK GS GROUND SHOT (SPOT ELEVATION) INV INVERT ELEVATION (UTILITY) I,IR,IRR IRRIGATION (UTILITY) LIP LIP OF GUTTER TC TOP OF CURB FCL FENCE, CHAIN LINK WMA WALL, MASONRY DYL DOUBLE YELLOW LINE SWL SOLID WHITE LINE UTILITY LINES MISCELLANEOUS LINES CONCEPTUAL BOUNDARY LINES 268 HARDSCAPE LINES CONTROL POINT CONTOUR WITH LABEL ELEVATION W/ DESCRIPTION NATURAL GROUND SPOT ELEVATION FIRE HYDRANT METER POLE SIGN BOX VALVE ADJACENT PROPERTY LINE BACK OF CURB FACE OF CURB FLOWLINE LIP OF GUTTER SIDEWALK/CONCRETE FENCE, CHAIN-LINK ELECTRIC GAS/FUEL LINE SURVEY LEGEND CENTERLINE GENERAL 268.65 EP267.9 UTILITIES EASEMENT LINE WALL SANITARY SEWER STORM DRAIN PROPERTY LINE RIGHT OF WAY LINE SECTION LINE

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA 37 Know what'sbelow. Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
TOPOGRAPHIC SURVEY TOPOGRAPHIC SURVEY 0 10 20 40 SCALE: 1" = 20' T1.0 080525

GAS LINE LOCATION PER USA MARKINGS

FUEL LINE TRENCH PATCH

GAS LINE LOCATION PER USA MARKINGS
STOP

OLIVE AVENUE DRAKE STREET KNOX STREET

PADRE AVENUE
15002
15003
15004
267.9 267.8
268.1
268.0
267.9
268.0
268.1
268.2
268.6
268.4
268.2
268.4
268.3
268.7 268.6
268.4
268.2
268.2
268.0
268.4
268.2
268.3
268.0
267.6
267.6
267.8
267.8
268.0
267.6
267.9
267.8
268.2
268.5
267.9
267.9
268.0
268.2
268.6 268.6
268.2
267.8
268.1
268.3
268.4
268.0
268.2
268.0
267.9
267.9
268.1 267.8
268.0
267.9
267.9
268.1
268.4
268.4
268.3
268.3
267.9
268.0
268.3
268.6
268.8
268.2 268.5 268.3 268.6 268.3
268.5
268.1 268.0
268.3 268.4
268.2
267.9 268.8 268.2 268.0
268.7
268.4 268.2
268.4 268.4
268.5
268.5
268.2 268.2 268.4 268.4 268.7
268.5
268.3
267.9 268.2
268.1
267.8 268.0 268.2 268.2 268.1
268.4 267.8
267.7
267.6 267.5
268.2
267.8 267.7
267.9 267.9 268.4

IRR WATER E
268.18
CONC
268.29
CONC
268.1
267.76
EP
267.88
AC
267.98
AC
268.17
AC
268.06
AC
267.82
AC
268.14
EP
268.18
EP
268.32
EP
268.2
267.9
268.13
EP
268.33
AC
268.3
268.4
268.4
268.6

ELEC LINE TRENCH PATCH
268.6
268.7
268.7
269.14
AC
269.10
AC
268.8
268.6
268.8
268.5
268.7
268.6
W
268.5
268.6
268.81
CONC 268.81
CONC
268.6
268.48
AC
268.4
268.64
CONC
268.74
CONC
268.8
GB
268.8
GB
268.8
268.8 GB
GB
266.8
266.8
267.1
267.1 W
267.2
267.6
266.9
267.0
267.1
267.2 E
268.62
CONC
WATER LINE IRRIGATION SLEEVE 268 268
268
268
268
268
SWL

SWL DYL SWL
DWY 6' FCL 6' FCL
6' FCL
6' WMA 6' WMA DYL
268.32
AC
268.41
AC
268.40
EP
268.46
EP
268.50
EP
268.53
EP
268.59
EP
268.66
EP
268.76
EP
268.73
EP
268.30
AC
268.13

AC JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

DEMOLITION PLAN
L0.1
SCALE: 1" = 0 10 20 4020'

DEMOLITION LEGEND

SHEET NOTES
080525

GAS LINE LOCATION PER USA MARKINGS

FUEL LINE TRENCH PATCH

GAS LINE LOCATION PER USA MARKINGS
STOP

OLIVE AVENUE DRAKE STREET KNOX STREET
15002
15004
267.9 267.8
268.1
268.0
267.9
268.0
268.1
268.2
268.6
268.4
268.2
268.4
268.3
268.7 268.6
268.4
268.2
268.2
268.0
268.4
268.2
268.3
268.0
267.6
267.6
267.8
267.8
268.0
267.6
267.9
267.8
268.2
268.5
267.9
267.9
268.0
268.2
268.6 268.6
268.2
267.8
268.1
268.3
268.4
268.0
268.2
268.0
267.9
267.9
268.1 267.8
268.0
267.9
267.9
268.1
268.4
268.4
268.3
268.3
267.9
268.0
268.3
268.6
268.8
268.2 268.5 268.3 268.6 268.3
268.5
268.1 268.0
268.3 268.4
268.2
267.9 268.8 268.2 268.0
268.7
268.4 268.2
268.4 268.4
268.5
268.5
268.2 268.4 268.2 268.7 268.4
268.5
268.3
267.9
268.2
268.1
267.8 268.0 268.2 268.2 268.1
268.4 267.8
267.7
267.6 267.5
268.2
267.8 267.7
267.9 267.9 268.4 E
268.29
CONC
268.1
267.76
EP
268.17
AC
268.06
AC
267.82
AC
268.14
EP
268.18
EP
268.32
EP 268.2
267.9
268.13
EP
268.33
AC
268.3
268.4
268.4
268.6

ELEC LINE TRENCH PATCH
268.6
268.7
268.7
269.14
AC
269.10
AC
268.8
268.6
268.8
268.5
268.7
268.6
W
268.5
268.6
268.81
CONC 268.81
CONC
268.6
268.48
AC
268.4
268.64
CONC
268.74
CONC
268.8
GB
266.8
266.8
267.1
267.1 W
267.2
267.6
266.9
267.0
267.1
267.2 E
268.62
CONC
WATER LINE IRRIGATION SLEEVE 268 268
268
268
268
268
SWL

SWL DYL SWL
DWY 6' FCL 6' FCL
6' FCL
6' WMA 6' WMA DYL
268.32
AC
268.41
AC
268.40
EP
268.46
EP
268.50
EP
268.53
EP
268.59
EP
268.66
EP
268.76
EP
268.73

EP JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

EROSION CONTROL
PLAN
L0.2
SCALE: 1" = 0 10 20 4020'

EROSION CONTROL LEGEND
EROSION CONTROL NOTES:

SEDIMENT CONTROL DEVICES

DUST CONTROL MEASURES
080525
15002
15003
15004
267.8
268.6 268.6
268.1 267.8
268.6
268.3 268.6 268.3
268.7
268.6
268.7
268.5 268.6
268.6
268.6
268.4
268.8
GB
268.8
GB
268.8
268.8 GB
GB
266.8
267.2
S
SMH
RIM 267.18
INV. 6" 264.34(NE)
INV. 6" 264.24(W)
INV. 6" 264.24(S)
S
SMH
RIM 269.18
INV. 12" 261.63(W)
INV. 12" 261.53(N)
INV. 12" 261.43(E)
D
DMH
RIM 269.27
INV. 24" 255.99(NE)
INV. 36" 252.22(S)
INV. 30" 253.07(E)
INV. 18" 258.29(W)

KNOX STREET

OLIVE AVENUE

DRAKE STREET JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company

GRADING AND

DRAINAGE PLAN
C1.0

DISCLAIMER NOTE

GRADING NOTES
MONUMENT PRESERVATION:

FEMA FLOOD ZONE:

CLEARING NOTES:

DUST CONTROL NOTES:

STORM WATER POLLUTION PREVENTION:

ABBREVIATIONS
LEGEND
SCALE: 1" =
0 10 20 40
20'
080525
UTILITY NOTES CONTRACTOR RESPONSIBILITIES NOTICES STOP IRR S SMH RIM 267.18 INV. 6" 264.34(NE) INV. 6" 264.24(W) INV. 6" 264.24(S) S SMH RIM 269.18 INV. 12" 261.63(W) INV. 12" 261.53(N) INV. 12" 261.43(E) D DMH RIM 269.27 INV. 24" 255.99(NE) INV. 36" 252.22(S) INV. 30" 253.07(E) INV. 18" 258.29(W)

KNOX STREET

DRAKE STREET
OLIVE AVENUE NEPLUS WAY C2.0 UTILITY PLAN

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA 37 Know what'sbelow. Callbefore you dig. R 100% BID SET 1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company 0 10 20 40 SCALE: 1" = 20' STORM DRAIN PIPE MATERIALS: 080525 C3.0 CIVIL DETAILS

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA 37 Know what'sbelow. Callbefore you dig. R 100% BID SET 1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company ID Top Elev. Bottom Elev. Surface Depth (in.) Media Layer (in.) Area of Filter Media (SF) Volume Storage(CF) Overflow Rim Elev Overflow Inv. Elev 1 266.75 265.25 9.00 18.00 681.50 511.12 266.00 263.09 2 266.40 265.40 12.00 18.00 236.50 236.50 266.40 262.90 SECTION B PLAN VIEW SECTION A 080525 C3.1 CIVIL DETAILS

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA 37 Know what'sbelow. Callbefore you dig. R 100% BID SET 1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company 080525
C3.2 WALL PROFILES

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA 37 Know what'sbelow. Callbefore you dig. R 100% BID SET 1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company 080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025

GENERAL NOTES GENERAL LIGHTING NOTES

SITE FEATURES AND

FINISHES LEGEND

AND NOTES
L1.0
PLAYGROUND SURFACING SCHEDULE (ADD ALT #1)

REFERENCE KEY

SITE FEATURE SCHEDULE

PLAYGROUND FEATURE SCHEDULE
BASKETBALL COURT/TABLE TENNIS AREA SURFACING SCHEDULE (ADD ALT #2)

SITE FINISH SCHEDULE
080525

OLIVE AVENUE DRAKE STREET KNOX STREET

PADRE AVENUE
268
268
268
268
268
268 6' FCL JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025

SITE FEATURES AND

FINISHES PLAN
L1.1
SCALE: 1" =
0 10 20 40
20'

SITE FEATURE SCHEDULE
A COURT SURFACING ENLARGEMENT PLAN (ADD ALT #2)

SITE FINISH SCHEDULE

BASKETBALL COURT / TABLE TENNIS AREA
SURFACING SCHEDULE (ADD ALT #2)
080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025

PLAYGROUND

ENLARGEMENT PLAN
L1.2
SCALE: 1" =
0 5 10 20
10'
A
PLAYGROUND EQUIPMENT ENLARGEMENT PLAN BPLAYGROUND SURFACING ENLARGEMENT PLAN (ADD ALT #1) C

PLAYGROUND RENDERING (FOR REFERENCE ONLY)
D

PLAYGROUND RENDERING (FOR REFERENCE ONLY)

PLAYGROUND FEATURE SCHEDULE
E

PLAYGROUND RENDERING (FOR REFERENCE ONLY)
PLAYGROUND SURFACING SCHEDULE (ADD ALT #1)
080525

OLIVE AVENUE DRAKE STREET KNOX STREET

PADRE AVENUE
5' CLR. 5' CLR. 8' OPENING TYP.
8'

OPENING
6' TYP.
5'-6" 7'-6"
R57'
6'
135°
135°
R20'
R54' 20'-3"
22'-10" 13'-10"
R10'
11'-9" ±70'-6"
R2' 41'-3"
±40'-11" 3'-3"
R10'
1'-5"
3'-2" 1'-2" 8'-5" 9'-1" 8'-9"
3'-1" 5'-6"
4'-3" 7'-5"
R24'
6'
13'-9"
4'
12' 11'-9" 6'-2"
7'-2" 3'-1" 1'-10"
10"
40'-9" 2'-7"
71'-10"
56'
5'-9"
6'-1"
6' 1'-4" 7"
1'-5" 5'-8"
11'-11"
26'-8" 10'-4" 13'-4"
27'-9" 4'-8"
20' 6'-11" 3'-4"
6' 2'-8" 1'-2"
17'-6" 2'-2"
13'-10"
40'-3" 9" 4" 8'
14'-4" 14'-10"
12'
R4' R20' 1'-8"
1' 4'-7" 8"
6' 2'-4"
7'
19'-11"
R38' 11'-3"
1'
R30' 1'
10' 3'-1"
30' 5'
17'-6" 23'-6" 21'-6" ±15'-2" 3'-7"
R25'
R35' 5'-8"
4'-4" 19'-3"
2'-6" 2'-6" EQ. EQ.
5'-11" 3'-9"
R49'-8" 4'
43'-7"
R7'
R11'
R19'-7"
R19'-1" R16'-3"
R7'
5'-4" R26'
2'-8" 7'-10" 3'-11" 5'-8"
15'-2"
R37'-8"
12'-8" 8'-1"
14'-10" 4'-2"
5'-7"
45' 6'
34'-5" 5'-2" 6'-9"
21'-3"
17'-3" 24' 15'-4" 12'-5"
43'-6" R41'
27'-9" 2'-8"
16' 4'-5" 10"
2' 1'-7" 12'-8"
R8'-6"
R6'-8"
R9' 3'-11"
22'-8" 12'-10" 7'-8" 10'-1"
31'-8"
6'-11" 38'-4"
4'
12' 14'-10"
16'-7"
10'-8"
R24'-11" 4'-7"
R11'-6" 7' 12'-10"
31'-2"
R13' 6'-4" 10'-6"
10'-9" 4'-10"
8'-1"
25'-7" 15'-7"
6' 2'-4" 2'-10"
6' 8'-3"
20'
22'-9" 8'-3"
8'-6"
6' TYP. 6' TYP.

R4' 2'-10"
34'-5" 4'-3"
10" FROM
PROPERTY LINE 10" FROM PROPERTY LINE
3'
3'
6'
5'-10"
7'-8" 7'-9"
44'-7" 7'-3"
39'-7" 13'-1"
34'
7'-7" 8'-8" 2'-4"
15'-10" 2'
11'-4" 7'-5"
34'-3" 4'-2"
45'-2" 4'-1"
24'-6" 1'-9"
12'-6" 3'-5"
32' 2'-6"
26'-9" 3'-7"
14'-1" 1'-7"
18'-9" 3'-10"
19'-8"
7'-2" 3'-3" 2'-8"
29'-6" 6'-5"
15'-1" 12'-4"
44'-5"
22'-10" 4'-1" 4"
35'-3"
32'-4" 3'-6" 2'-11"
37'-5" 3' 4'-7"
35'-11" 2'-8"
21'-6"
27'-4" 2'-10" 2'-8"
34'-5" 4'-3" 1'-5"
6'
5'-10"
7'-8" 7'-9" JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025

HORIZONTAL

CONTROL PLAN
L2.0
SCALE: 1" =
0 10 20 40
20'

LAYOUT LEGEND
LENGTH

RADIUS GENERAL LAYOUT NOTES
A

PLAYGROUND AND SHADE SAILS FOOTINGS ENLARGEMENT PLAN
080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025
” ”
”
“ ”
”
”
“
”
”
”
”

GENERAL IRRIGATION NOTES

PIPING SCHEDULE

VALVE CALLOUT

PRESSURE LOSS CALCULATIONS

IRRIGATION LEGEND

AND NOTES
L3.0
WS
080525

OLIVE AVENUE DRAKE STREET KNOX STREET

PADRE AVENUE

IRR WATER
W
W

WATER LINE IRRIGATION SLEEVE C
WS
W
OLIVE AVENUE 6' FCL 6' FCL
6' FCL 6' WMA JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

IRRIGATION PLAN
L3.1
SCALE: 1" = 0 10 20 4020'

SHEET NOTES A OFFSITE IRRIGATION PLANSLEEVING NOTES
080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025

MWELO CALCS &

IRRIGATION

SCHEDULE
L3.2

IRRIGATED LANDSCAPE WATER EFFICIENCY TABLE IRRIGATION SCHEDULE

WATER BUDGET CALCULATIONS SCHEDULING NOTES & RUN TIMES

MAXIMUM APPLIED WATER ALLOWANCE
MAWA TOTAL=

ESTIMATED TOTAL WATER USE
ETWU TOTAL=

HYDROZONE INFORMATION TABLE WINTER SPRING SUMMER FALL

LANDSCAPE AREAS

SPECIAL LANDSCAPE AREAS
080525

ON-SITE PLANT LEGEND

PLANT LIST ABBREVIATIONS JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025 “ ”

GENERAL PLANTING NOTES

PLANTING LEGEND

AND NOTES
L4.0

OFF-SITE PLANT LEGEND
080525

OLIVE AVENUE DRAKE STREET KNOX STREET

PADRE AVENUE KNOX STREET
OLIVE AVENUE 6' FCL 6' FCL
6' FCL 6' WMA JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

PLANTING PLAN
L4.1
SCALE: 1" = 0 10 20 4020' A OFFSITE PLANTING PLAN
080525

CONSTRUCTION

DETAILS
L5.0JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

JAMES TAUBERT PARK
Another project funded through the California Natural Resources Agency to protect, restore, and enhance California's cultural, community, and natural resources. GAVIN NEWSOM, GOVERNOR Wade Crowfoot, Secretary for Natural Resources Armando Quintero, Director, California Department of Parks and Recreation PARK

JAMES TAUBERT
080525

CONSTRUCTION

DETAILS
L5.1JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025 4" 4" 4"
080525

CONSTRUCTION

DETAILS
L5.2JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025
080525

CONSTRUCTION

DETAILS
L5.3JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025
080525

CONSTRUCTION

DETAILS
L5.4JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig.

R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350
a Westwood company
Signature Renewal Date Date

L ICENSED LANDSCAPE ARCHITECT

STATE OF CA L I FORN I A
SA M I R K HA NNA # 6 3 6 0
05/31/27
5/30/2025
080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

IRRIGATION DETAILS
L6.0 080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

IRRIGATION DETAILS
L6.1 080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

IRRIGATION DETAILS
L6.2 080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

IRRIGATION DETAILS
L6.3 080525

JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS MADERA, CALIFORNIA 37 Know what'sbelow.

Callbefore you dig. R 100% BID SET
1280 E. OLIVE AVENUE, MADERA CA 93638
odellengineering.com
westwoodps.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 a Westwood company
Signature Renewal Date Date L ICENSED LANDSCAPE ARCHITECT STATE OF CA L I FORN I ASA M I R K HA NNA # 6 3 6 0 05/31/27
5/30/2025

PLANTING DETAILS
L7.0 ·
080525
odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA Know what'sbelow. Callbefore you dig. 100% BID SET R NOT FOR CONSTRUCTION 1280 E. OLIVE AVENUE, MADERA CA 93638
PEZZONI ENGINEERING, INC. ãCopyrighted 2024 1150 9TH Street Suite #1415 Modesto, CA 95354 PHONE: 209 . 554 . 4602 HTTP://WWW.PEZENGR.COM

OLIVE AVENUE DRAKE STREET KNOX STREET
PADRE AVENUE STOP E E S odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA Know what'sbelow. Callbefore you dig. 100% BID SET R NOT FOR CONSTRUCTION 1280 E. OLIVE AVENUE, MADERA CA 93638
PEZZONI ENGINEERING, INC. ãCopyrighted 2024 1150 9TH Street Suite #1415 Modesto, CA 95354 PHONE: 209 . 554 . 4602 HTTP://WWW.PEZENGR.COM ” ” STOP 15004 E E S SMH RIM 267.18 INV. 6" 264.34(NE)
INV. 6" 264.24(W)INV. 6" 264.24(S)

OLIVE AVENUE DRAKE STREET KNOX STREET

PADRE AVENUE

0.8 0.6

0.4 0.3

0.2 0.1

0.1 0.1

0.0 1.1

1.3 1.1

1.0 0.9

1.0 1.4

1.6 1.2

0.1 0.1

0.2 0.2

0.2 0.3

0.4 0.6

0.8 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 1.1

0.7 0.5

0.3 0.2

0.2 0.1

0.1 0.0

1.6 2.1

1.7 0.9

0.8 0.9

2.2 2.2

1.6 0.2

0.2 0.2

0.3 0.3

0.4 0.5

0.7 1.1

0.0 0.0

0.0 0.0

0.0 0.1

0.1 0.1

0.2 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

1.2 0.8

0.5 0.3

0.2 0.2

0.1 0.1

0.0 1.9

2.6 2.5

1.0 0.8

1.1 2.6

2.6 1.9

0.3 0.3

0.3 0.3

0.4 0.4

0.6 0.8

1.3 0.0

0.0 0.0

0.0 0.0

0.2 0.2

0.2 0.3

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 1.3

0.8 0.6

0.4 0.3

0.2 0.2

0.1 0.0

2.0 2.8

3.0 1.6

1.4 1.7

3.2 2.9

2.0 0.6

0.6 0.5

0.4 0.4

0.5 0.6

0.9 1.3

0.4 0.5

0.5 0.4

0.4 0.4

0.4 0.4

0.5 0.2

0.2 0.2

0.2 0.3

0.3 0.3

0.4 0.4

0.1 0.1

0.1 0.2

0.2 0.2

0.2 0.2

0.2 0.0

0.0 0.0

1.3 0.9

0.6 0.4

0.3 0.2

0.2 0.2

0.0 2.1

3.0 3.8

3.5 3.7

3.5 3.7

3.1 2.1

1.1 0.8

0.6 0.5

0.5 0.5

0.7 0.9

1.4 0.6

0.8 1.0

0.8 0.6

0.6 0.6

0.8 1.1

0.3 0.4

0.4 0.5

0.6 0.6

0.5 0.5

0.5 0.1

0.1 0.1

0.2 0.3

0.4 0.5

0.4 0.4

0.0 0.0

0.0 1.4

0.9 0.7

0.5 0.4

0.3 0.2

0.2 0.0

2.0 2.9

3.5 3.7

4.0 3.6

3.2 2.6

1.9 1.4

1.0 0.7

0.6 0.6

0.6 0.7

1.0 1.4

0.7 1.1

1.5 1.7

0.9 0.8

0.8 1.5

1.8 0.6

0.6 0.7

1.0 1.2

0.9 0.7

0.6 0.6

0.1 0.1

0.2 0.3

0.4 0.7

1.0 1.0

0.7 0.0

0.0 0.1

1.3 1.0

0.7 0.6

0.4 0.4

0.3 0.2

0.0 1.9

2.5 2.9

3.1 3.3

2.9 2.5

2.1 1.7

1.4 1.0

0.8 0.6

0.6 0.7

0.8 1.1

1.4 0.7

1.1 1.6

2.0 1.3

0.7 0.9

1.8 1.9

0.7 0.8

1.1 1.9

1.6 1.1

0.7 0.6

0.6 0.1

0.1 0.2

0.3 0.5

0.8 1.3

1.7 1.5

0.0 0.0

0.1 1.2

1.1 0.9

0.7 0.6

0.5 0.4

0.3 0.0

2.0 2.4

2.6 2.7

2.7 2.5

2.1 1.8

1.5 1.2

0.9 0.8

0.7 0.7

0.8 0.9

1.2 1.5

0.7 0.9

1.3 1.5

1.4 1.2

1.1 1.6

1.5 0.8

0.6 1.2

1.8 1.5

1.0 0.7

0.6 0.6

0.1 0.1

0.2 0.3

0.5 0.8

1.2 1.7

1.6 0.0

0.0 0.1

1.4 1.3

1.1 0.9

0.7 0.6

0.5 0.4

0.0 2.2

2.7 2.8

2.9 2.7

2.4 2.1

1.8 1.5

1.0 0.9

0.8 0.8

0.8 0.9

1.1 1.4

1.8 0.6

0.7 0.9

1.0 1.1

1.2 1.2

1.1 1.1

1.1 1.2

1.3 1.3

1.1 0.8

0.6 0.5

0.5 0.1

0.1 0.2

0.2 0.4

0.6 0.9

1.2 1.4

0.0 0.0

0.1 1.7

1.7 1.5

1.2 1.0

0.8 0.6

0.5 0.0

2.7 3.0

3.0 3.1

3.1 2.7

2.3 2.0

1.8 0.9

0.9 1.0

1.0 1.0

1.2 1.4

1.7 2.2

0.5 0.5

0.6 0.7

0.8 0.9

0.9 0.9

0.9 1.0

1.0 0.9

0.8 0.7

0.6 0.5

0.4 0.4

0.1 0.1

0.1 0.2

0.3 0.5

0.6 0.8

0.9 0.0

0.0 0.0

2.3 2.4

2.2 1.8

1.5 1.2

0.9 0.6

0.0 3.0

2.9 2.3

2.7 3.2

3.1 2.7

2.5 2.4

1.0 1.1

1.2 1.4

1.4 1.5

1.8 2.1

2.6 0.4

0.4 0.5

0.5 0.6

0.6 0.7

0.8 0.9

0.6 0.6

0.6 0.5

0.5 0.5

0.4 0.4

0.4 0.1

0.1 0.1

0.2 0.2

0.3 0.4

0.5 0.5

0.0 0.0

0.0 3.2

3.4 3.1

2.7 2.2

1.6 1.1

0.7 0.0

2.9 1.9

1.2 1.7

2.9 3.4

3.2 3.2

3.2 1.2

1.4 1.7

1.9 1.9

2.0 2.2

2.5 3.0

0.4 0.4

0.4 0.4

0.5 0.6

0.7 0.8

1.0 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.4 0.4

0.1 0.1

0.1 0.1

0.2 0.2

0.3 0.3

0.3 0.0

0.0 0.0

3.9 4.0

3.6 3.4

2.9 2.0

1.2 0.8

0.0 2.6

1.4 1.1

1.3 2.5

3.4 3.5

3.7 4.0

1.6 2.0

2.3 2.6

2.6 2.6

2.7 2.8

3.0 0.5

0.5 0.5

0.5 0.5

0.6 0.7

0.9 1.2

0.3 0.3

0.3 0.4

0.4 0.4

0.4 0.5

0.5 0.0

0.1 0.1

0.1 0.1

0.1 0.2

0.2 0.2

0.0 0.0

0.0 3.1

2.7 2.5

3.3 3.1

2.1 1.3

0.8 0.0

3.1 2.4

1.4 2.2

3.1 3.4

3.4 3.7

4.0 2.1

2.5 2.7

2.9 2.8

3.1 3.0

2.8 3.0

0.6 0.6

0.6 0.5

0.5 0.6

0.7 1.0

1.5 0.2

0.3 0.3

0.4 0.5

0.5 0.6

0.7 0.7

0.0 0.0

0.1 0.1

0.1 0.1

0.1 0.2

0.2 0.0

0.0 0.0

1.7 0.9

1.0 2.5

2.7 2.0

1.3 0.8

0.0 3.0

2.9 2.5

2.9 3.1

3.0 3.1

3.3 3.3

2.2 2.5

1.9 1.8

1.8 2.7

2.8 2.6

2.7 1.0

0.9 0.8

0.7 0.6

0.6 0.7

1.0 1.5

0.2 0.3

0.4 0.5

0.7 0.8

0.9 1.0

1.1 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.1 0.2

0.0 0.0

0.0 1.3

0.9 0.9

2.1 2.5

1.9 1.2

0.7 0.0

2.4 2.6

2.6 2.7

2.5 2.5

2.6 2.9

2.8 1.9

2.0 1.0

0.6 0.9

2.1 2.5

2.3 2.3

1.4 1.4

1.2 0.9

0.7 0.6

0.7 1.0

1.4 0.2

0.3 0.4

0.7 0.9

1.2 1.4

1.2 1.2

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.1 0.0

0.0 0.0

1.2 1.0

1.0 1.4

1.8 1.5

1.0 0.6

0.0 1.8

1.9 1.9

1.9 1.8

1.8 1.9

2.2 1.9

1.8 1.8

0.8 0.6

0.8 1.6

2.0 1.9

1.8 1.3

1.9 1.5

1.0 0.8

0.6 0.7

0.9 1.3

0.2 0.3

0.5 0.8

1.2 1.7

1.5 0.8

0.7 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.0 0.0

0.0 1.1

1.0 1.0

1.0 1.1

1.0 0.7

0.5 0.0

1.2 1.3

1.3 1.3

1.3 1.3

1.3 1.3

1.2 1.4

1.3 0.8

0.8 0.8

1.0 1.4

1.4 1.3

1.1 1.9

1.5 1.1

0.8 0.6

0.6 0.8

1.0 0.2

0.3 0.5

0.8 1.3

1.8 1.5

0.7 0.8

0.0 0.0

0.0 0.0

0.0 0.1

0.1 0.1

0.1 0.0

0.0 0.0

0.8 0.8

0.7 0.7

0.6 0.6

0.5 0.4

0.2 0.8

0.9 0.9

0.9 0.9

0.9 0.8

0.8 0.8

0.9 0.8

0.7 0.7

0.8 0.8

0.8 0.9

0.9 0.7

1.0 1.1

0.9 0.6

0.5 0.5

0.6 0.8

0.2 0.3

0.5 0.7

1.1 1.2

0.8 0.6

0.6 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.1

0.0 0.0

0.0 0.5

0.5 0.5

0.4 0.4

0.3 0.3

0.2 0.2

0.6 0.6

0.6 0.6

0.6 0.6

0.5 0.5

0.5 0.5

0.5 0.5

0.5 0.5

0.5 0.5

0.5 0.6

0.4 0.4

0.5 0.5

0.5 0.4

0.4 0.4

0.5 0.2

0.2 0.4

0.5 0.6

0.5 0.4

0.4 0.4

0.0 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.0

0.0 0.0
P2L @ 14'
P2L @ 14'
P2L @ 14'
P3 @ 14'
P5H @ 14'
P3H @ 14'
P3H @ 14'
odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA Know what'sbelow. Callbefore you dig. 100% BID SET R NOT FOR CONSTRUCTION 1280 E. OLIVE AVENUE, MADERA CA 93638
PEZZONI ENGINEERING, INC. ãCopyrighted 2024 1150 9TH Street Suite #1415 Modesto, CA 95354 PHONE: 209 . 554 . 4602 HTTP://WWW.PEZENGR.COM P3P5 P3H P5H P2L odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350

JAMES TAUBERT PARK

LANDSCAPE IMPROVEMENT PLANS
MADERA, CALIFORNIA Know what'sbelow. Callbefore you dig. 100% BID SET R NOT FOR CONSTRUCTION 1280 E. OLIVE AVENUE, MADERA CA 93638
PEZZONI ENGINEERING, INC. ãCopyrighted 2024 1150 9TH Street Suite #1415 Modesto, CA 95354 PHONE: 209 . 554 . 4602 HTTP://WWW.PEZENGR.COM odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS Know what'sbelow.

Callbefore you dig.

R 1280 E. OLIVE AVENUE MADERA, CA 93638
JUSTIN W. CAPP
CE #61393, SE #4813
1003 12th STREET, MODESTO, CA 95354
PO BOX 861, MODESTO, CA 95353
(209) 524-4774.
www.justinwcapp.com
JUSTIN W. CAPP, Inc.

ENGINEERING + DESIGN
ENGINEER:

ENGINEER'S SEAL:

SHEET TITLE INDEX
STRUCTURAL DRAWINGS GENERAL:

1. DETAILS AND DIMENSIONS OF CONSTRUCTION SHALL BE VERIFIED AT THE SITE BY THE CONTRACTOR AND ANY DISCREPANCY BETWEEN THE PLANS AND THE INTENT OF THE PROJECT SHALL BE PROMPTLY REPORTED TO THE ENGINEER. DO NOT SCALE DRAWINGS.

2. OWNERSHIP OF DOCUMENTS: THESE DOCUMENTS, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF JUSTIN W. CAPP ENGINEERING AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JUSTIN W. CAPP ENGINEERING.

3. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF LOCAL, COUNTY, STATE, OR FEDERAL AGENCIES HAVING JURISDICTION.

JUSTIN W. CAPP ENGINEERING ASSUMES NO RESPONSIBILITY FOR SUPERVISION OF CONSTRUCTION OR PROPER EXECUTION OF THE WORK SHOWN ON THESE DRAWINGS. SAFETY METHODS AND TECHNIQUES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY DEVIATIONS OR UNAUTHORIZED CHANGES TO THESE DRAWINGS ARE NOT THE RESPONSIBILITY OF JUSTIN W. CAPP ENGINEERING.

DEVIATIONS FROM THE ORIGINAL DRAWINGS MUST BE APPROVED IN WRITING PRIOR TO CONSTRUCTION. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO NOTIFY THE ENGINEER OF THE PROGRESS OF THE PROJECT TO FACILITATE OUR ON-SITE VISITS TO ANSWER QUESTIONS AND VIEW THE PROGRESS AND QUALITY OF WORK.

4. THE CONTRACTOR SHALL NOTIFY OUR OFFICE 48 HOURS PRIOR TO THE FOLLOWING PHASES OF CONSTRUCTION:

A. FOUNDATION POURS
B. AFTER THE ERECTION OF THE SUPERSTRUCTURE AND PRIOR TO CLOSING-IN OF ANY PHASE.

5. ALL STRUCTURAL MEMBERS SHOWN ON THE PLANS ARE DESIGNED AS IN THEIR FINAL LOCATION. JUSTIN W. CAPP ENGINEERING DOES

NOT PERFORM CONSTRUCTION ENGINEERING OR ENGINEERING NECESSARY TO PLACE ANY STRUCTURAL MEMBERS IN THEIR FINAL LOCATION.

DESIGN CRITERIA:

1. GOVERNING BUILDING CODES & MANUALS:
2022 CBC: CALIFORNIA BUILDING CODE
ASCE 7-16: ASCE STANDARD MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES AISC 360: SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS AISC 341: SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS AISI S100-16 (2020): NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS 2016 EDITION (REAFFIRMED 2020), WITH SUPPLEMENT 2, 2020 EDITION AISI S240-20: NORTH AMERICAN STANDARD FOR COLD-FORMED STEEL STRUCTURING FRAMING AISI S400-20: NORTH AMERICAN STANDARD FOR SEISMIC DESIGN OF COLD-FORMED STEEL STRUCTURAL SYSTEMS ACI 318-19: BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE TMS 402-2016: BUILDING CODE FOR MASONRY STRUCTURES
TMS 602-2016: SPECIFICATION FOR MASONRY STRUCTURES
AWC NDS-2018: NATIONAL DESIGN SPECIFICATION (NDS) FOR WOOD CONSTRUCTION - WITH 2018 NDS SUPPLEMENT AWC SDPWS-2021: SPECIAL DESIGN PROVISIONS FOR WIND AND SEISMIC

2. THE STRUCTURE & EACH COMPONENT HAS BEEN DESIGNED TO RESIST THE MOST CRITICAL EFFECT RESULTING FROM THE COMBINATION OF LOADS PER 2022 CALIFORNIA BUILDING CODE LOAD COMBINATIONS.

4. WIND:

A. BASIC WIND SPEED (3-SECOND GUST) 94 MILES PER HOUR
B. RISK CATEGORY II
C. WIND EXPOSURE = C

5. SEISMIC:

A. EQUIVALENT LATERAL FORCE PROCEDURE.

B. RISK CATEGORY II
C. SEISMIC IMPORTANCE FACTOR: Ie = 1.00
D. MAPPED SPECTRAL RESPONSE ACCELERATION, SHORT PERIOD: Ss = 0.594g E. MAPPED SPECTRAL RESPONSE ACCELERATION, 1 SECOND: S1 = 0.233g F. SITE CLASS: D
G. DESIGN SPECTRAL RESPONSE ACCELERATION, SHORT PERIOD: SDS = 0.525g H. DESIGN SPECTRAL RESPONSE ACCELERATION,1 SECOND: SD1 = 0.331g I. SEISMIC DESIGN CATEGORY: D
EXISTING CONSTRUCTION:

1. ALL CONSTRUCTION INDICATED IS NEW UNLESS SPECIFICALLY DENOTED AS EXISTING.

2. CAREFULLY EXAMINE THE CONSTRUCTION DOCUMENTS AND NOTIFY THE STRUCTURAL ENGINEER OF ANY CONFLICTS OR

DISCREPANCIES WITHIN THE STRUCTURAL CONSTRUCTION DOCUMENTS AND BETWEEN ALL OTHER CONSTRUCTION DOCUMENTS AND THE EXISTING CONSTRUCTION.

3. EXISTING CONSTRUCTION INDICATED IN THE CONSTRUCTION DOCUMENTS IS BASED UPON INFORMATION SHOWN ON AVAILABLE EXISTING DRAWINGS AND/OR LIMITED VISUAL OBSERVATIONS. THE EXISTING CONSTRUCTION MAY VARY FROM THAT INDICATED ON THE CONSTRUCTION DOCUMENTS. PROVIDE ALL WORK AND MATERIALS NECESSARY TO COMPLETE THE PROJECT AS REPRESENTED IN THE CONSTRUCTION DOCUMENTS.

4. VERIFY ALL DIMENSIONS AND ELEVATIONS OF THE EXISTING CONSTRUCTION PRIOR TO STARTING CONSTRUCTION OR FABRICATION. DO NOT SCALE EXISTING DRAWINGS.

5. PROVIDE AND MAINTAIN A COMPLETE AND LEGIBLE COPY OF THE EXISTING CONSTRUCTION DOCUMENTS AND MAKE THEM AVAILABLE FOR USE ON THE JOB SITE.

6. EXISTING STRUCTURAL ELEMENTS SHALL NOT BE REMOVED OR MODIFIED UNLESS INDICATED IN THE STRUCTURAL CONSTRUCTION DOCUMENTS. IF EXISTING STRUCTURAL ELEMENTS INTERFERE WITH THE WORK INDICATED IN ANY CONSTRUCTION DOCUMENT, OR IF UNCERTAIN THAT AN ELEMENT IS STRUCTURAL, NOTIFY THE STRUCTURAL ENGINEER.

7. PROVIDE ALL MEASURES NECESSARY FOR PROTECTION OF THE EXISTING STRUCTURE AND SITE DURING DEMOLITION AND CONSTRUCTION. MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, PROVIDING ADEQUATE SHORING, BRACING, WEATHER PROTECTION AND DUST PROTECTION. THE REMOVAL OR MODIFICATION OF EXISTING STRUCTURAL ELEMENTS SHALL BE PERFORMED IN A MANNER TO PREVENT DAMAGE TO THOSE ELEMENTS TO REMAIN. SHOULD DAMAGE OCCUR TO ANY EXISTING ELEMENTS, THEY SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.

8. EXISTING FOUNDATIONS THAT MAY BE AFFECTED BY ANY EXCAVATIONS REQUIRED FOR THIS PROJECT SHALL BE UNDERPINNED, SHORED OR SUPPORTED ADEQUATELY TO PREVENT SETTLEMENT AND LATERAL MOVEMENT.

9. IF EXISTING STRUCTURAL ELEMENTS NOT INDICATED FOR REPLACEMENT OR REPAIR ARE DISCOVERED TO BE DAMAGED OR DIFFERENT THAN INDICATED ON THE CONSTRUCTION DOCUMENTS, NOTIFY THE STRUCTURAL ENGINEER. SUCH DAMAGE OR DIFFERENCE SHALL

INCLUDE, BUT NOT BE LIMITED TO, ROT, WATER DAMAGE, INSECT DAMAGE, POOR WORKMANSHIP OR FIT-UP, BUCKLING, EXCESSIVE DEFLECTION, SAGGING, TWISTING, WARPING, AND DIFFERENT SIZE, ORIENTATION, GRADE, QUALITY, OR MATERIAL.

10. WHEN INSTALLING ANCHORS (POST-INSTALLED EXPANSION AND CHEMICAL ANCHORS OR POWDER ACTUATED FASTENERS) OR

DRILLING/CORING HOLES AT EXISTING CONCRETE OR MASONRY, DO NOT DAMAGE OR CUT EXISTING REINFORCING (REBAR OR PRE/POST- TENSIONED STRANDS) UNLESS SPECIFICALLY NOTED OTHERWISE. LOCATE ALL EXISTING REINFORCING AT AFFECTED AREAS USING NON-DESTRUCTIVE MEANS PRIOR TO INSTALLING ANCHORS OR DRILLING/CORING HOLES. LOCATE EDGE OF ANCHORS OR HOLES NO CLOSER THAN 1" FROM FACE OF EXISTING REINFORCING.

11. VERIFY ALL EXISTING CONSTRUCTION FRAMING NOTED ON THESE DRAWINGS. CONTACT JUSTIN W. CAPP ENGINEERING IF THERE ARE ANY DISCREPANCIES OF EXISTING CONSTRUCTION & THAT WHICH IS SHOWN ON THESE DRAWINGS.

EARTHWORK:

EARTHWORK SHALL COMPLY WITH THE FOLLOWING: 1. CHAPTER 18 OF THE CALIFORNIA BUILDING CODE.

2. GEOTECHNICAL REPORT AS PREPARED BY CRAWFORD & ASSOCIATES, DATED JANUARY 27, 2022; PROJECT # 22-847.1.

FOUNDATIONS:

1. EXISTING FOOTINGS OR FOUNDATIONS WHICH MAY BE AFFECTED BY ANY EXCAVATION SHALL BE UNDERPINNED ADEQUATELY OR OTHERWISE PROTECTED AGAINST SETTLEMENT AND SHALL BE PROTECTED AGAINST LATERAL MOVEMENT.

2. THE ALLOWABLE FOUNDATION AND LATERAL PRESSURES ARE BASED ON THE VALUES SET FORTH IN THE EARTHWORK SECTION.

A. CLASS OF MATERIALS: SEE SOILS REPORT
B. ALLOWABLE FOUNDATION PRESSURE:

C. LATERAL BEARING: 170 LB./SQ.FT. PER FOOT OF DEPTH.

D. LATERAL SLIDING RESISTANCE: 0.58
E. ALL FOOTINGS SHALL BEAR ON UNDISTURBED SOIL 12" BELOW NATURAL OR FINISHED GRADE, WHICHEVER IS LOWER.

3. FOUNDATIONS SUPPORTING WOOD SHALL EXTEND AT LEAST 8" ABOVE THE ADJACENT FINISH GRADE.

4. FOUNDATIONS FOR ALL BUILDINGS WHERE THE SURFACE OF THE GROUND SLOPES MORE THAN 1' IN 10' SHALL BE LEVEL OR SHALL BE STEPPED SO THAT BOTH TOP AND BOTTOM OF SUCH FOUNDATIONS ARE LEVEL.

5. FOUNDATION PLATES OR SILLS SHALL BE BOLTED TO THE FOUNDATION OR FOUNDATION WALL WITH NOT LESS THAN 5/8" NOMINAL DIAMETER STEEL BOLTS EMBEDDED AT LEAST 7" INTO THE CONCRETE OR MASONRY AND SPACED NOT MORE THAN 4' APART. THERE SHALL BE A MINIMUM OF TWO BOLTS PER PIECE WITH ONE BOLT LOCATED WITHIN 12" OF EACH END OF EACH PIECE. A PROPERLY SIZED NUT AND WASHER SHALL BE TIGHTENED ON EACH BOLT TO THE PLATE.

CONCRETE:

1. MATERIALS:

A. CEMENT SHALL CONFORM TO THE CBC, PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENTS, TYPE I OR TYPE II.

B. AGGREGATES SHALL CONFORM TO ASTM C150.

C. WATER USED IN MIXING CONCRETE SHALL BE CLEAN AND FREE FROM INJURIOUS AMOUNTS OF OILS, ACIDS, ALKALIS, SALTS, ORGANIC MATERIALS OR OTHER SUBSTANCES THAT MAY BE DELETERIOUS TO CONCRETE OR REINFORCEMENT. NONPOTABLE WATER SHALL NOT BE USED IN CONCRETE.

D. ALL MIX DESIGNS SHALL BE PROPORTIONED IN ACCORDANCE WITH SECTION 4.3 "PROPORTIONING ON THE BASIS OF FIELD EXPERIENCE AND/OR TRIAL MIXTURES" OF ACI 318-14. SUBMIT MIX DESIGNS ON EACH CLASS OF CONCRETE FOR REVIEW.

E. THE PROPOSED MIX DESIGNS SHALL BE ACCOMPANIED BY COMPLETE STANDARD DEVIATION ANALYSIS OR TRIAL MIXTURE TEST DATA. MIX DESIGNS SHALL SHOW PROPORTIONS OF CEMENT, FINE AND COARSE AGGREGATE ADMIXTURES, WATER, AND GRADATION OF FINE AND COARSE AGGREGATES.

F. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN THE MIXES TO PROVIDE THE MINIMUM REQUIREMENTS LISTED BELOW. CEMENT CONTENT SHALL BE INCREASED OVER THAT LISTED, IF REQUIRED TO OBTAIN THE LISTED COMPRESSIVE STRENGTH. THE REQUIRED COMPRESSION STRENGTH OF CONCRETE AFTER 28 DAYS IS AS FOLLOWS:

2. CONCRETE SHALL BE DEPOSITED AS NEARLY AS PRACTICABLE IN ITS FINAL POSITION TO AVOID SEGREGATION DUE TO REHANDLING OR FLOWING. CONCRETING SHALL BE CARRIED ON AT SUCH A RATE THAT CONCRETE IS AT ALL TIMES PLASTIC AND FLOWS READILY INTO SPACES BETWEEN REINFORCEMENT. CONCRETE THAT HAS PARTIALLY HARDENED OR BEEN CONTAMINATED BY FOREIGN MATERIALS SHALL NOT BE DEPOSITED IN THE STRUCTURE.

3. CONCRETE (OTHER THAN HIGH-EARLY-STRENGTH) SHALL BE MAINTAINED ABOVE 50°F. AND IN A MOIST CONDITION FOR AT LEAST THE FIRST 7 DAYS AFTER PLACEMENT.

4. CONDUITS, PIPES AND SLEEVES OF ANY MATERIAL NOT HARMFUL TO CONCRETE AND WITHIN LIMITATIONS OF CBC MAY BE EMBEDDED IN

CONCRETE WITH APPROVAL OF THE ENGINEER OF RECORD, PROVIDED THEY ARE NOT CONSIDERED TO REPLACE STRUCTURALLY THE DISPLACED CONCRETE. REINFORCEMENTS, ANCHOR BOLTS, PIPE SLEEVES, AND OTHER INSERTS SHALL BE POSITIVELY SECURED IN PLACE PRIOR TO PLACING CONCRETE.

5. PROVIDE CONTROL OR CONSTRUCTION JOINTS PER PLAN (15'-0" MAX). FURNISH AND INSTALL POLYURETHANE FILLER, PER ARCHITECT'S REQUIREMENTS, TO ALL SAWCUT AND CONSTRUCTION JOINTS.

6. ADDITIVES AND ADMIXTURES TO CONCRETE SHALL NOT BE USED UNLESS APPROVED BY THE ENGINEER OF RECORD.

7. CONCRETE SHOULD NOT BE PLACED IN CONDITIONS WITH TEMPERATURES EXCEEDING 90°F. IF CONCRETE MUST BE PLACED IN TEMPERATURES EXCEEDING 90°F, CONTRACTOR TO TAKE NECESSARY PRECAUTIONS (AT RISK). WHEN HIGH TEMPERATURES, LOW HUMIDITY AND DRY WINDS CREATE CONDITIONS SUITABLE FOR PLASTIC CRACKING, THE EVAPORATION RETARDER "EUCOBAR" BY THE EUCLID CHEMICAL CO. OR "CONFILM" BY MASTER BUILDERS MAY BE REQUIRED TO BE APPLIED BY SPRAY ONE OR MORE TIMES DURING THE FINISHING OPERATION.

8. ADHESIVE ANCHORS SHALL BE INSTALLED IN CONCRETE HAVING A MINIMUM AGE OF 21 DAYS AT TIME OF ANCHOR INSTALLATION.

9. REINFORCING:

A. REINFORCEMENT SHALL BE DEFORMED REINFORCEMENT, EXCEPT THAT PLAIN REINFORCEMENT MAY BE USED FOR SPIRALS.

B. REINFORCEMENT SHALL CONFORM TO ASTM A 615, REINFORCING BARS FOR CONCRETE.

C. REINFORCING BARS SHALL HAVE 60,000 PSI (GRADE 60) SPECIFIED YIELD STRENGTH.

D. WELDED SMOOTH WIRE FABRIC FOR CONCRETE REINFORCEMENT SHALL CONFORM TO ASTM A1064.

E. ALL WELDED REBAR SHALL BE ASTM A706.

MASONRY:

1. MATERIALS:

A. AGGREGATES SHALL CONFORM TO ASTM C 144, AGGREGATES FOR MASONRY MORTAR AND ASTM C 404, AGGREGATES FOR GROUT.

B. CEMENT SHALL CONFORM TO THE CBC, MASONRY CEMENT AND THE CBC, PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENTS AND THE CBC MORTAR CEMENT.

C. LIME SHALL CONFORM TO THE CBC TABLE 2105.2.2.1.2, QUICK LIME FOR STRUCTURAL PURPOSES AND THE CBC, HYDRATED LIME FOR MASONRY PURPOSES.

D. MASONRY UNITS SHALL CONFORM TO THE CBC, HOLLOW AND SOLID LOAD-BEARING CONCRETE MASONRY UNITS, TYPE I OR TYPE II.

E. MORTAR SHALL CONFORM TO THE CBC TABLE 2103.8.1 AND 2. MORTAR FOR UNIT MASONRY.

F. GROUT SHALL CONFORM TO THE CBC, GROUT FOR MASONRY.

G. WATER USED IN MIXING MORTAR OR GROUT SHALL BE CLEAN AND FREE FROM INJURIOUS AMOUNTS OF OILS, ACIDS, ALKALIS, SALTS, ORGANIC MATERIALS OR OTHER SUBSTANCES THAT MAY BE DELETERIOUS TO MASONRY OR REINFORCEMENT.

NONPOTABLE WATER SHALL NOT BE USED.

H. MORTAR SHALL CONSIST OF A MIXTURE OF CEMENTITIOUS MATERIAL AND AGGREGATE TO WHICH SUFFICIENT WATER AND APPROVED ADDITIVES, IF ANY, HAVE BEEN ADDED TO ACHIEVE A WORKABLE, PLASTIC CONSISTENCY. THE PROPORTION OF INGREDIENTS SHALL BE AS SPECIFIED IN THE CBC FOR TYPE S.

I. GROUT SHALL CONSIST OF A MIXTURE OF CEMENTITIOUS MATERIALS AND AGGREGATE TO WHICH WATER HAS BEEN ADDED SUCH THAT THE MIXTURE WILL FLOW WITHOUT SEGREGATION OF THE CONSTITUENTS. WATER CONTENT SHALL BE ADJUSTED TO PROVIDE PROPER WORKABILITY AND ENABLE PROPER PLACEMENT UNDER EXISTING FIELD CONDITIONS, WITHOUT SEGREGATION.

THE PROPORTION OF INGREDIENTS SHALL BE AS SPECIFIED IN THE CBC.

2. ADDITIVES AND ADMIXTURES TO MORTAR OR GROUT SHALL NOT BE USED UNLESS APPROVED BY THE ENGINEER OF RECORD.

2. PRIOR TO GROUTING, THE GROUT SPACE SHALL BE CLEAN SO THAT ALL SPACES TO BE FILLED WITH GROUT DO NOT CONTAIN MORTAR PROJECTIONS GREATER THAN 1/2", MORTAR DROPPINGS OR OTHER FOREIGN MATERIAL. GROUT SHALL BE PLACED SO THAT ALL CELLS SHALL BE FILLED SOLID.

3. GROUT MATERIALS AND WATER CONTENT SHALL BE CONTROLLED TO PROVIDE ADEQUATE FLUIDITY FOR PLACEMENT WITHOUT SEGREGATION OF THE CONSTITUENTS, AND SHALL BE MIXED THOROUGHLY. THE GROUTING OF ANY SECTION OF WALL SHALL BE COMPLETED IN ONE DAY WITH NO INTERRUPTIONS GREATER THAN ONE HOUR. BETWEEN GROUT POURS, A HORIZONTAL

CONSTRUCTION JOINT SHALL BE FORMED BY STOPPING ALL WYTHES AT THE SAME ELEVATION AND WITH THE GROUT STOPPING A MINIMUM OF 1 1/2" BELOW A MORTAR JOINT, EXCEPT AT TOP OF WALL.

4. CLEANOUTS ARE REQUIRED FOR ALL GROUT POURS OVER 5' IN HEIGHT. WHEN REQUIRED, CLEANOUTS SHALL BE PROVIDED IN THE BOTTOM COURSE AT EVERY VERTICAL BAR BUT SHALL NOT BE SPACED MORE THAN 32" ON CENTER.

5. COMPLIANCE WITH THE REQUIREMENTS FOR THE SPECIFIED COMPRESSIVE STRENGTH OF MASONRY F'M SHALL BE IN ACCORDANCE WITH THE FOLLOWING: UNIT STRENGTH METHOD.

6. SPECIAL INSPECTION OF STRUCTURAL MASONRY IS REQUIRED ON THIS PROJECT.

7. MORTAR SHALL COMPLY WITH THE MORTAR TYPE REQUIRED IN THE CBC FOR TYPE S MORTAR.

9. REINFORCING:

A. REINFORCEMENT SHALL BE DEFORMED REINFORCEMENT.

B. REINFORCING BARS SHALL HAVE 60,000 PSI (GRADE 60) SPECIFIED YIELD STRENGTH.

10. DESIGN STANDARD OF MASONRY: f'm = 2500 PSI

CLASS STRENGTH
(PSI) SLUMP (MAX) AGGREGATES(MAX)
MIN. CEMENT
LB. PER CY
MAX. W.C.

RATIO
SLABS ON GRADE 4,000 5" 3/4" 450 0.50
FOUNDATIONS 4,000 6" 1" 550 0.50
WALLS 4,000 5" 3/4" 450 0.50

FOOTING MAXIMUM BEARING PRESSURES
MIN. FTG. EMBEDMENT

DEPTH (INCHES)

MAXIMUM BEARING PRESSURE FOR
LIVE + DEAD LOADS (PSF)

MAXIMUM BEARING PRESSURE FOR
LIVE + DEAD + (WIND OR SEISMIC LOADS) (psf)
12 1,500 2,000
STEEL:

1. STRUCTURAL STEEL SHALL CONFORM TO THE CBC, MATERIAL SPECIFICATIONS FOR STRUCTURAL STEEL AS FOLLOWS:

A. PLATES AND CHANNELS: ASTM A36, Fy = 36 KSI
B. STRUCTURAL STEEL: ASTM A992, Fy = 50 KSI
C. STEEL PIPE: ASTM A53, GRADE B, Fy = 35 KSI
D. HIGH STRENGTH BOLTS: ASTM A325 1/2" TO 1" DIAMETER, INCLUSIVE, Fy = 92 KSI, 1 1/8" TO 1 1/2" DIAMETER, INCLUSIVE, Fy = 81 KSI E. STRUCTURAL TUBING: ASTM A500, GRADE C, Fy = 50 KSI

2. AMERICAN WELDING SOCIETY (AWS) "CODE FOR ARC AND GAS WELDING IN BUILDING CONSTRUCTION" SHALL BE USED AS A STANDARD SPECIFICATION. WELD ELECTRODES SHALL BE 70 KSI.

3. CONNECTORS SHALL CONFORM TO CBC, HIGH-STRENGTH BOLTS UNLESS OTHERWISE NOTED.

4. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL TEMPORARY SUPPORTS REQUIRED FOR ERECTION. THIS STRUCTURE MAY NOT BE SELF-SUPPORTING AS DEFINED IN THE AISC CODE OF STANDARD PRACTICE; THEREFORE ERECTION BRACING IS REQUIRED AND IS TO BE PREPARED BY A LICENSED CIVIL OR STRUCTURAL ENGINEER. ERECTION PLANS, AND SEQUENCE MEMBER DETAILS TO BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO FABRICATION.

5. STRUCTURAL AND MISCELLANEOUS SHAPES, PLATES AND BARS SHALL CONFORM WITH ASTM AND SHALL BE FABRICATED IN ACCORDANCE WITH AISC “SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS”, LATEST EDITION.

6. ALL STEEL SHALL BE THOROUGHLY CLEANED, REMOVING ALL LOOSE MILL SCALE, GREASE, DIRT AND FOREIGN MATTER BY SCRAPING OR SANDBLASTING. APPLY ONE COAT OF ZINC RICH SHOP PRIME, (2 MIL DFT). DO NOT SHOP PAINT MEMBERS OR PORTIONS OF

MEMBERS TO BE EMBEDDED IN CONCRETE OR MORTAR, PAINT EMBEDDED STEEL WHICH IS PARTIALLY EXPOSED ON EXPOSED PORTIONS AND INITIAL 2" OF EMBEDDED PORTIONS ONLY. DO NOT PAINT SURFACES WHICH ARE TO BE WELDED.

7. HOLES SHALL BE 1/16" LARGER THAN THE NOMINAL DIAMETER OF THE BOLT.

8. ALL SHOP WELDING SHALL BE PERFORMED BY A LICENSED FABRICATOR APPROVED BY THE BUILDING OFFICIAL. IN LIEU OF AN APPROVED FABRICATOR, THE OWNER SHALL EMPLOY A SPECIAL INSPECTOR TO OBSERVE AND APPROVE ALL SHOP WELDING. ALL FIELD WELDING SHALL REQUIRE SPECIAL INSPECTION, UNLESS OTHERWISE APPROVED BY THE BUILDING OFFICIAL.

STRUCTURAL NOTES
& SPECIFICATIONS
S000
5 SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS

NOT FOR CONSTRUCTION
100% SUBMITTAL
S000 STRUCTURAL NOTES & SPECIFICATIONS
S001 STRUCTURAL NOTES & SPECIFICATIONS
S600 WALL PLAN & SECTIONS
S601 TYPICAL STRUCTURAL DETAILS
S602 FOOTING DETAILS
8/29/24
odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS Know what'sbelow.

Callbefore you dig.

R 1280 E. OLIVE AVENUE MADERA, CA 93638
JUSTIN W. CAPP
CE #61393, SE #4813
1003 12th STREET, MODESTO, CA 95354
PO BOX 861, MODESTO, CA 95353
(209) 524-4774.
www.justinwcapp.com
JUSTIN W. CAPP, Inc.

ENGINEERING + DESIGN
ENGINEER:

ENGINEER'S SEAL:

1. IN ADDITION TO THE INSPECTIONS REQUIRED BY THE CBC, THE SPECIAL INSPECTOR SHALL PROVIDE INSPECTIONS DURING CONSTRUCTION ON THE FOLLOWING TYPES OF WORK:

CONCRETE CONSTRUCTION (CBC 1705.3)

REQUIRED VERIFICATION OR INSPECTION TASK EXTENT REMARKS X 1. INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS, AND VERIFY PLACEMENT. PERIODIC

2. REINFORCING BAR WELDING
- a. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706 PERIODIC - b. INSPECT SINGLE-PASS FILLET WELDS, MAXIMUM 5/16" PERIODIC - c. INSPECT ALL OTHER WELDS CONTINUOUS
X 3. INSPECT ANCHORS CAST IN CONCRETE PERIODIC

4. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS - a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS.

CONTINUOUS
X b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4.A PERIODIC X 5. VERIFY USE OF REQUIRED DESIGN MIX PERIODIC
X 6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF THE CONCRETE.

CONTINUOUS 4 CYLINDERS PER
150 CY: TEST 1 @ 7,
2 @ 28, 1 HOLD
- 7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES. CONTINUOUS XCEPTION: SITEWORK / SLABS

ON GRADE
- 8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES. PERIODIC

9. INSPECT PRESTRESSED CONCRETE FOR:
- a. APPLICATION OF PRESTRESSING FORCES CONTINUOUS
- b. GROUTING OF BONDED PRESTRESSING TENDONS CONTINUOUS - 10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS PERIODIC - 11. VERIFY IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF TENDONS IN POST-TENSIONED

CONCRETE AND PRIOR TO REMOVAL OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS.

PERIODIC
- 12. INSPECT FORMWORK FOR SHAPE, LOCATION, AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED. PERIODIC

2. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION

OF THE BUILDING OFFICIAL AND THE ENGINEER OF RECORD FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION.

3. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR:

A) SPECIAL INSPECTION REPORTS ARE TO BE KEPT ON THE JOBSITE FOR BUILDING INSPECTOR VERIFICATION.

B) THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE WITH THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS.

C) ALL DISCREPANCIES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF

NOT CORRECTED DISCREPANCIES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE BUILDING OFFICIAL, AND DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE BEFORE COMPLETION OF THAT STAGE OF WORK.

D) A FINAL SPECIAL INSPECTION REPORT, FROM THE SPECIAL INSPECTOR(S), DOCUMENTING THE REQUIRED SPECIAL

INSPECTIONS WERE PERFORMED, CORRECTION OF DISCREPANCIES, AND COMPLIANCE WITH CONSTRUCTION DOCUMENTS SHALL BE SUBMITTED BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED.

E) THE INSPECTION AND TESTING AGENT(S) SHALL BE ENGAGED BY THE OWNER OR THE OWNER'S AGENT, AND NOT BY THE CONTRACTOR OR SUBCONTRACTOR WHOSE WORK IS TO BE INSPECTED OR TESTED. ANY CONFLICT OF INTEREST MUST BE DISCLOSED TO THE BUILDING OFFICIAL PRIOR TO COMMENCING WORK. THE QUALIFICATIONS OF THE SPECIAL

INSPECTOR(S) AND/OR TESTING AGENCIES MAY BE SUBJECT TO THE APPROVAL OF THE BUILDING OFFICIAL AND/OR THE DESIGN PROFESSIONAL.

F) THE LIST OF SPECIAL INSPECTORS MAY BE SUBMITTED AS A SEPARATE DOCUMENT, IF NOTED SO ABOVE.

G) SPECIAL INSPECTIONS AS REQUIRED BY CBC SEC. 1704.2.5 ARE NOT REQUIRED WHERE THE FABRICATOR IS APPROVED IN ACCORDANCE WITH CBC SEC. 1704.2.5.2
H) OBSERVE ON A RANDOM BASIS, OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. PERFORM THESE TASKS FOR EACH WELDED JOINT, BOLTED CONNECTION, OR STEEL ELEMENT.

I) NDT OF WELDS COMPLETED IN AN APPROVED FABRICATOR'S SHOP MAY BE PERFORMED BY THAT FABRICATOR WHEN APPROVED BY THE AHJ. REFER TO AISC 360, N7.

STRUCTURAL STEEL CONSTRUCTION (CBC 1705.2.1)

REQUIRED VERIFICATION OR INSPECTION TASK EXTENT REMARKS - 1. FABRICATOR AND ERECTOR DOCUMENTS (VERIFY REPORTS AND CERTIFICATES AS LISTED IN AISC 360 SEC. N3.2 FOR COMPLIANCE W/ CONSTRUCTION DOCUMENTS) PERIODIC

2. WELDING
- a. INSPECTION TASKS PRIOR TO WELDING (OBSERVE, OR PERFORM FOR EACH WELDED JOINT OR MEMBER, THE QA TASKS LISTED IN AISC 360 TABLE N5.4-1) SEE AISC 360
TABLE N5.4-1

OBSERVE OR PERFORM

AS NOTED
- b. INSPECTION TASKS DURING WELDING (OBSERVE, OR PERFORM FOR EACH WELDED JOINT OR MEMBER, THE QA TASKS LISTED IN AISC 360 TABLE N5.4-2) SEE AISC 360
TABLE N5.4-2

OBSERVE OR PERFORM

AS NOTED
- c. INSPECTION TASKS AFTER WELDING (OBSERVE, OR PERFORM FOR EACH WELDED JOINT OR MEMBER, THE QA TASKS LISTED IN AISC 360 TABLE N5.4-3) SEE AISC 360
TABLE N5.4-3

OBSERVE OR PERFORM

AS NOTED
d. NONDESTRUCTIVE TESTING IN ACCORDANCE W/ AWS D1.1
- 1) CJP GROOVE WELDS 5/16" OR GREATER IN RISK CATEGORY III OR IV - ULTRASONIC TESTING

REQUIRED
- 2) CJP GROOVE WELDS 5/16" OR GREATER IN RISK CATEGORY II - ULTRASONIC TESTING REQUIRED ON 10% OF WELDS
- 3) THERMALLY CUT SURFACES OF ACCESS HOLES WHEN MATERIAL T > 2" - - 4) WELDED JOINTS SUBJECT TO FATIGUE WHEN REQUIRED BY AISC 360 APPENDIX 3 - - 5) FABRICATOR'S NDT REPORTS WHEN FABRICATOR PERFORMS NDT - 3. HIGH STRENGTH BOLTING - a. INSPECTION TASKS PRIOR TO BOLTING (OBSERVE, OR PERFORM FOR EACH BOLTED JOINT OR MEMBER, THE QA TASKS LISTED IN AISC 360 TABLE N5.6-1) SEE AISC 360
TABLE N5.6-1

OBSERVE OR PERFORM AS
NOTED
- b. INSPECTION TASKS DURING BOLTING (OBSERVE, OR PERFORM FOR EACH BOLTED JOINT OR MEMBER, THE QA TASKS LISTED IN AISC 360 TABLE N5.6-2) SEE AISC 360
TABLE N5.6-2

OBSERVE OR PERFORM AS
NOTED
- c. INSPECTION TASKS AFTER BOLTING (OBSERVE, OR PERFORM FOR EACH BOLTED JOINT OR MEMBER, THE QA TASKS LISTED IN AISC 360 TABLE N5.6-3) SEE AISC 360
TABLE N5.6-3

OBSERVE OR PERFORM AS
NOTED
- 4. VERIFY MEMBER LOCATIONS, BRACES, STIFFENERS, AND APPLICATION OF JOINT DETAILS AT EACH

CONNECTION COMPLY WITH CONSTRUCTION DOCUMENTS
-
- 5. INSPECTION OF STEEL ELEMENTS OF COMPOSITE CONSTRUCTION PRIOR TO CONCRETE PLACEMENT IN ACCORDANCE WITH QA TASKS LISTED IN AISC 360 TABLE N6.1 - OBSERVE OR PERFORM AS
NOTED
SOILS (CBC 1705.6)

REQUIRED VERIFICATION OR INSPECTION TASK EXTENT REMARKS - 1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY. PERIODIC
- 2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL. PERIODIC
X 3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS.

PERIODIC
95% COMPACTION TYPICAL.

SEE SOILS REPORT FOR ALL
OTHER CASES. - 4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND COMPACTION OF COMPACTED FILL. CONTINUOUS
- 5. PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY. PERIODIC
MASONRY CONSTRUCTION (CBC 1705.4)

REQUIRED VERIFICATION OR INSPECTION TASK EXTENT REMARKS

LEVEL B
X 1. VERIFY COMPLIANCE WITH THE APPROVED SUBMITTALS PERIODIC

2. AS MASONRY CONSTRUCTION BEGINS, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:

X a. PROPORTIONS OF SITE-PREPARED MORTAR PERIODIC
X b. CONSTRUCTION OF MORTAR JOINTS PERIODIC
- c. GRADE AND SIZE OF PRESTRESSING TENDONS AND ANCHORAGES PERIODIC X d. LOCATION OF REINFORCEMENT, CONNECTORS, AND PRESTRESSING TENDONS AND

ANCHORAGES

PERIODIC
- e. PRESTRESSING TECHNIQUE PERIODIC
- f. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY PERIODIC

3. PRIOR TO GROUTING, VERIFY THAT THE FOLLOWING ARE IN
- a. GROUT SPACE PERIODIC
- b. GRADE, TYPE, AND SIZE OF REINFORCEMENT AND ANCHOR BOLTS, AND PRESTRESSING

TENDONS AND ANCHORAGES

PERIODIC
- c. PLACEMENT OF REINFORCEMENT, CONNECTORS, AND PRESTRESSING TENDONS AND

ANCHORAGES

PERIODIC
- d. PROPORTIONS OF SITE-PREPARED GROUT AND PRESTRESSING GROUT FOR BONDED

TENDONS

PERIODIC
- e. CONSTRUCTION OF MORTAR JOINTS PERIODIC

4. VERIFY DURING CONSTRUCTION:
- a. SIZE AND LOCATION OF STRUCTURAL ELEMENTS PERIODIC
- b. TYPE, SIZE, AND LOCATION OF ANCHORS, INCLUDING OTHER DETAILS OF ANCHORAGE OF

MASONRY TO STRUCTURAL MEMBERS, FRAMES, OR OTHER CONSTRUCTION

PERIODIC
- c. WELDING OF REINFORCEMENT CONTINUOUS
- d. PREPARATION, CONSTRUCTION, AND PROTECTION OF MASONRY DURING COLD WEATHER (TEMPERATURE BELOW 40°F) OR HOT WEATHER (TEMPERATURE ABOVE 90°F ) PERIODIC - e. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE CONTINUOUS - f. PLACEMENT OF GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS IS IN

COMPLIANCE CONTINUOUS
- g. PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION OF THIN-BED MORTAR JOINTS CONTINUOUS - 5. OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR SPECIMENS, AND/OR PRISMS PERIODIC

LEVEL C
- 1. VERIFY COMPLIANCE WITH THE APPROVED SUBMITTALS PERIODIC

2. VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
- a. PROPORTIONS OF SITE-MIXED MORTAR, GROUT AND PRESTRESSING GROUT FOR BONDED

TENDONS

PERIODIC
- b. GRADE, TYPE, AND SIZE OF REINFORCEMENT AND ANCHOR BOLTS, AND PRESTRESSING

TENDONS AND ANCHORAGES

PERIODIC
- c. PLACEMENT OF MASONRY UNITS AND CONSTRUCTION OF MORTAR JOINTS PERIODIC - d. PLACEMENT OF REINFORCEMENT, CONNECTORS, AND PRESTRESSING TENDONS AND

ANCHORAGES CONTINUOUS
- e. GROUT SPACE PRIOR TO GROUTING CONTINUOUS
- f. PLACEMENT OF GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS CONTINUOUS - g. SIZE AND LOCATION OF STRUCTURAL ELEMENTS PERIODIC
- h. TYPE, SIZE, AND LOCATION OF ANCHORS INCLUDING OTHER DETAILS OF ANCHORAGE OF

MASONRY TO STRUCTURAL MEMBERS, FRAMES, OR OTHER CONSTRUCTION

CONTINUOUS
- i. WELDING OF REINFORCEMENT CONTINUOUS
- j. PREPARATION, CONSTRUCTION, AND PROTECTION OF MASONRY DURING COLD WEATHER (TEMPERATURE BELOW 40°F) OR HOT WEATHER (TEMPERATURE ABOVE 90°F ) PERIODIC - k. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE CONTINUOUS - l. PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION OF THIN-BED MORTAR JOINTS CONTINUOUS - m. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY CONTINUOUS - 3. OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR SPECIMENS, AND/OR PRISMS CONTINUOUS * DEVELOPMENT LENGTH ldh (INCLUDING MODIFICATION FACTORS) MUST NOT BE LESS THAN THE LARGER OF 8db OR 6 INCHES.

TABLE 2: DEVELOPMENT LENGTH ldh (INCHES) OF STANDARD HOOKS FOR UNCOATED GRADE 60 BARS* 3,000
BAR SIZE NO.
4,000
3,000 psi 4,000 psi

BAR SIZE
BAR

DIAMETER,
db
POSITION3 LAP SPLICE, ls, INCH1 LAP SPLICE, ls, INCH
1 DEFORMED
BARS
EPOXY
COATED
EPOXY
COATED6 DEFORMED
BARS
EPOXY
COATED
EPOXY
COATED
6 28 34 42 25 29 37
22 26 33 19 23 28
38 45 56 33 39 49
29 35 43 25 30 37
47 56 70 41 49 61
36 43 54 31 37 47
3,000 psi 4,000 psi
DEVELOPMENT LENGTH, ld, INCH5 DEVELOPMENT LENGTH, ld, INCH 5 DEFORMED
BARS
EPOXY
COATED
EPOXY
COATED6 DEFORMED

BARS EPOXY COATED
EPOXY
COATED
6 22 26 33 19 23 28
17 20 25 15 18 22
29 35 43 25 30 37
22 27 33 19 23 29
36 43 54 31 37 47
28 33 42 24 29 36
NOTES:

1. SCHEDULED SPLICE VALUES ARE BASED ON A.C.I. 318-19, CLASS B REQUIREMENTS.

2. THE MINIMUM DEVELOPMENT AND SPLICE LENGTHS SHOWN HERE SHALL BE USED FOR ALL REINFORCING U.O.N.

3. TOP BAR IS WHERE THE HORIZONTAL REINFORCEMENT IS PLACED SUCH THAT MORE THAN 12 INCHES OF FRESH CONCRETE IS CAST BELOW THE DEVELOPMENT LENGTH OR SPLICE.

4. ALL WALL HORIZONTAL REINFORCEMENT ARE CONSIDERED TOP BARS.

5. CLEAR SPACING OF BARS OR WIRES BEING DEVELOPED OR SPLICED NOT LESS THAN db, CLEAR COVER NOT LESS THAN db, AND STIRRUPS OR TIES THROUGHOUT ld

NOT LESS THAN THE CODE MINIMUM OR CLEAR SPACING OF BARS OR WIRES BEING DEVELOPED OR SPLICED NOT LESS THAN 2db AND CLEAR COVER NOT LESS THAN db. 6. FOR EPOXY COATED BARS WITH COVER LESS THAN 3db OR CLEAR SPACING LESS THAN 6db.

REINFORCING STEEL BARS

BAR SIZE

DESIGNATION
A.S.T.M. A615/A706 CHART FOR REINFORCING STEEL BARS
#3
#4
#5

NOMINAL WEIGHT
(lb./ft.)

0.376

0.668

1.043

NOMINAL DIMENSIONS

DIAMETER
(INCHES)

CROSS SECTIONAL
AREA (IN²)
3/8 OR 0.375 0.11
1/2 OR 0.500 0.20
5/8 OR 0.625 0.31

LAP SPLICE TABLE

DEVELOPMENT LENGTH TABLE
3 4
5 6
7 8
9 10
11 14
18 9 8
11 10
14 12
17 15
19 17
22 19
25 22
28 24
31 27
37 32
50 43

BAR SIZE
BAR

DIAMETER,
db
POSITION3
3 0.375
TOP
OTHER
4 0.500
TOP
OTHER
5 0.625
TOP
OTHER
#6 1.502 3/4 OR 0.750 0.44

ULTIMATE SPECIFIED TENSILE
CAPACITY (lbs)
ASTM A615 ASTM A706
N/A
GRADE 60 GRADE 60
18,000
27,900
39,600
N/A
16,000
24,800
35,200
6 0.750
TOP
OTHER
3 0.375
TOP
OTHER
4 0.500
TOP
OTHER
5 0.625
TOP
OTHER
6 0.750
TOP
OTHER
43 39
33 29
56 43
49 37
53 42
67 52
84 65
58 45
73 56
63 50
48 36
58 43

REBAR HOOK & TIE DETAIL

STANDARD HOOK GEOMETRY FOR DEVELOPMENT OF DEFORMED BARS IN TENSION

TYPE OF

STANDARD HOOK BAR SIZE MINIMUM INSIDE

BEND DIAMETER (IN)
STRAIGHT EXTENSION *

L EXT (IN) TYPE OF STANDARD HOOK
90-DEGREE
HOOK
No. 3

THROUGH
No. 8
6db
12db No. 9

THROUGH
No. 11
8db No. 14
AND
No. 18
10db
180-DEGREE
HOOK
No. 3

THROUGH
No. 8
6db GREATER OF
4db AND 2.5 IN.

No. 9

THROUGH
No. 11
8db No. 14
AND
No. 18
10db

DIAMETER
L DH
90 DEGREE BEND L EXT

POINT AT WHICH BAR IS DEVELOPED

DIAMETER
L EXT

POINT AT WHICH BAR IS DEVELOPED
180° DEGREE
BEND

MINIMUM INSIDE BEND DIAMETERS AND STANDARD HOOK GEOMETRY FOR STIRRUPS, TIES, AND HOOPS

TYPE OF

STANDARD HOOK BAR SIZE MINIMUM INSIDE

BEND DIAMETER (IN)
STRAIGHT EXTENSION *

L EXT (IN) TYPE OF STANDARD HOOK
90-DEGREE
HOOK
No. 3

THROUGH
No. 5
4db GREATER OF6db AND
3 IN.

No. 6

THROUGH
No. 8
6db 12db
135-DEGREE
HOOK
No. 3

THROUGH
No. 5
4db GREATER OF
6db AND
3 IN. No. 6

THROUGH
No. 8
6db
180-DEGREE
HOOK
No. 3

THROUGH
No. 5
4db GREATER OF
4db AND

2.5 IN. No. 6

THROUGH
No. 8
6db

DIAMETER
90 DEGREE BEND L EXT

DIAMETER
L EXT
180° DEGREE
BEND
db

DIAMETER
L EXT
135° DEGREE
BEND
L DH
db
db
db
db
ƒ 'c (NORMAL WEIGHT CONCRETE), psi
* A STANDARD HOOK FOR DEFORMED BARS INCLUDES THE SPECIFIC INSIDE BEND DIAMETER AND STRAIGHT EXTENSION LENGTH. IT SHALL BE PERMITTED TO USE A LONGER STRAIGHT EXTENSION AT THE END OF A HOOK.

A LONGER EXTENSION SHALL NOT BE CONSIDERED TO INCREASE THE ANCHORAGE CAPACITY OF THE HOOK ARCH = ARCHITECTURAL
AFF = ABOVE FINISH FLOOR
ALT = ALTERNATE
AB = ANCHOR BOLT
BLDG = BUILDING
BLKG = BLOCKING
BN = BLOCK NAIL
BO = BOTTOM OF
BOJ = BOTTOM OF JOIST
C/L = CENTERLINE
CJ = CONTROL JOINT
CONST JT = CONSTRUCTION JOINT
CLR = CLEAR
COL = COLUMN
CONC = CONCRETE
CONT = CONTINUOUS
CIP = CAST IN PLACE
CMU = CONCRETE MASONRY UNIT
DET = DETAIL
DIA = DIAMETER
DIAG = DIAGONAL
DIM = DIMENSION
DBL = DOUBLE
DF = DOUGLAS FIR
DWG's = DRAWING(S)
(E) = EXISTING
EA = EACH
EF = EACH FACE
EQ = EQUAL
EXP JT = EXPANSION JOINT
E/W = EACH WAY
ELEV = ELEVATION
ELECT = ELECTRICAL
EN = EDGE NAIL
EXT = EXTERIOR
FOW = FACE OF WALL
FTG = FOOTING
FND = FOUNDATION
FD = FLOOR DRAIN
FF = FINISH FLOOR
FG = FINISH GRADE
GA = GAUGE
GALV = GALVANIZED
GLB = GLULAM BEAM
HF = HEM FIR
HDR = HEADER
HGR = HANGER
HORIZ = HORIZONTAL
HT = HEIGHT
INT = INTERIOR
LONG = LONGITUDINAL
LVL = LAMINATED VENEER LUMBER
LLH = LONG LEG HORIZONTAL
LLV = LONG LEG VERTICAL
LS = LAG SCREW
MB = MACHINE BOLT
MTL = METAL
MISC = MISCELLANEOUS
MECH = MECHANICAL
MFR = MANUFACTURER
MFG = MANUFACTURING
MIN = MINIMUM
MAX = MAXIMUM
(N) = NEW
N/A = NOT APPLICABLE
NO = NUMBER
NOM = NOMINAL
NTS = NOT TO SCALE
O/ = OVER
O.C. = ON CENTER
OPNG = OPENING
PAF = POWDER ACTUATED FASTENER
PARA = PARALLEL
PERP = PERPENDICULAR
PERIM = PERIMETER
PL = PLATE
PLY = PLYWOOD
PLBG = PLUMBING
PREFAB = PREFABRICATED
PSL = PARALLEL STRAND LUMBER
PT = PRESSURE TREATED
R = RADIUS
REQ'D = REQUIRED
REINF = REINFORCING
S = SLOPE
SCH = SCHEDULE
SDS = SELF DRILLING SCREW
SIM = SIMILAR
SPEC = SPECIFICATIONS
SQ = SQUARE
SS = STAINLESS STEEL
STL = STEEL
STRUCT = STRUCTURAL
STAG = STAGGERED
STD = STANDARD
STIFF = STIFFENER
SYM = SYMBOL
T&G = TONGUE & GROOVE
T&B = TOP & BOTTOM
TC = TOP OF CURB
TOB = TOP OF BEAM
TOC = TOP OF CONCRETE
TOF = TOP OF FRAMING
TOM = TOP OF MASONRY
TOP = TOP OF PLYWOOD
TOS = TOP OF STEEL
TOW = TOP OF WALL
TRANS = TRANSVERSE
TS = TOP OF SLAB
TYP = TYPICAL
UON = UNLESS OTHERWISE NOTED
VERT = VERTICAL
VIF = VERIFY IN FIELD
W/ = WITH
W/O = WITHOUT
WP = WORKING POINT
WWF = WELDED WIRE FABRIC
DETAIL NO.

SHEET NO.

SAND
GRAVEL
EARTH

PLYWOOD

WOOD CONTINUOUS

WOOD BLOCKING
STEEL

GYPSUM BOARD
& STUCCO
GROUT

MASONRY

CONCRETE

GRID REFERENCE

DETAIL REFERENCE

DETAIL INDICATOR

ELEVATION INDICATOR

DETAIL IN SECTION

REFERENCE

FOOTING

SCHEDULE ITEM

SHEAR WALL

SCHEDULE ITEM

WALL REINFORCING

SCHEDULE ITEM

ELEVATION
(SECTIONS & DETAILS)

ELEVATION (PLANS)

ELEVATION

DESCRIPTION
(LENGTH)

SYMBOLS LEGEND
A
AX.X
AX.X
A
1 2
3 4 AX.X
A
4 AX.X
A
X
X
X
X
X
X
X
X

XXXXXXX

XXXXXXX

STRUCTURAL NOTES
& SPECIFICATIONS
S001
5 NOT FOR CONSTRUCTION
100% SUBMITTAL

ABBREVIATIONS REBAR SPECIFICATIONS & NOTES SPECIAL INSPECTION AND TESTING SCHEDULE SPECIAL INSPECTION AND TESTING SCHEDULE 8/29/24
10 x 8 x 16 C.M.U. WALL W/
#5 BARS @ 16" O.C. VERTICAL,
#4 BARS @ 16" O.C. HORIZONTAL;
FULLY GROUTED.

CENTER BARS IN WALL.

VARIES, SEE
CIVIL DWG's
FOR GRADE WALL HEIGHT ABOVE GRADE PER CIVIL DWG'S 3'-0" MAX.

FG PER

CIVIL/SURVEY
1'-0" 1'-0" 3" 2"
3"
2"

PROPERTY LINE

AS OCCURS, SEE
SURVEY DWG's.
2'-6" 3"

STONE WALL CAP

PER LANDSCAPE
DWG's
(2) #4 BARS IN
TOP COURSE 3"
6"
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION. 2'-6" LAP MIN 3"
(2) #4 BARS IN
BASE COURSE 1'-6"
EG PER
CIVIL/SURVEYVARIES, SEE CIVIL DWG's 32" MIN
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION.
#5 BAR

CONTINUOUS
(3) #5 BARS LONGITUDINAL,

SPACED EVENLY

TOP & BOTTOM MAT
(TOTAL OF 6)
10"

TO WALL PER
CIVIL/SURVEY 3'-6" 2'-6"3'-6"
P/L
10'-0"

CMU WALL SECTION

PER CIVIL PLANS
10'-0"

CMU WALL SECTION

PER CIVIL PLANS
10'-0"

CMU WALL SECTION
6" PER CIVIL PLANS 10" 1'-0" 3'-0"

CMU WALL SECTION

PER CIVIL PLANS
24'-0"

CMU WALL SECTION
PER CIVIL PLANS 4'-0"6" 10"
10 x 8 x 16 C.M.U. WALL W/
#5 BARS @ 16" O.C. VERTICAL,
#4 BARS @ 16" O.C. HORIZONTAL;
FULLY GROUTED.

CENTER BARS IN WALL.
1'-0" 1'-0" 3" 2"
3"
2"

PROPERTY LINE

AS OCCURS, SEE
SURVEY DWG's.
4'-0" 3"
(2) #4 BARS IN
TOP COURSE 3"
6"
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION. 2'-6" LAP MIN 3"

VARIES, SEE
CIVIL DWG's
FOR GRADE WALL HEIGHT ABOVE GRADE PER CIVIL DWG'S 6'-0" MAX. (2) #4 BARS IN
BASE COURSE1'-6"
EG PER

CIVIL/SURVEY
VARIES, SEE CIVIL DWG's
FG PER
CIVIL/SURVEY 32" MIN
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION.
#5 BAR

CONTINUOUS
(4) #5 BARS LONGITUDINAL,

SPACED EVENLY

TOP & BOTTOM MAT
(TOTAL OF 8)
10"

TO WALL PER

CIVIL/SURVEY

STONE WALL CAP

PER LANDSCAPE
DWG's
10 x 8 x 16 C.M.U. WALL W/
#5 BARS @ 16" O.C. VERTICAL,
#4 BARS @ 16" O.C. HORIZONTAL;
FULLY GROUTED.

CENTER BARS IN WALL.
1'-0" 1'-0" 3" 2"
3"
2"

PROPERTY LINE

AS OCCURS, SEE
SURVEY DWG's.
3'-6" 3"
(2) #4 BARS IN
TOP COURSE 3"
6"
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION. 2'-6" LAP MIN 3"

VARIES, SEE
CIVIL DWG's
FOR GRADE WALL HEIGHT ABOVE GRADE PER CIVIL DWG'S 5'-0" MAX. (2) #4 BARS IN
BASE COURSE 1'-6"
EG PER
CIVIL/SURVEY VARIES, SEE CIVIL DWG's
FG PER
CIVIL/SURVEY 32" MIN
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION.
#5 BAR

CONTINUOUS
(4) #5 BARS LONGITUDINAL,

SPACED EVENLY

TOP & BOTTOM MAT
(TOTAL OF 8)
10"

STONE WALL CAP

PER LANDSCAPE
DWG's

TO WALL PER

CIVIL/SURVEY
10 x 8 x 16 C.M.U. WALL W/
#5 BARS @ 16" O.C. VERTICAL,
#4 BARS @ 16" O.C. HORIZONTAL;
FULLY GROUTED.

CENTER BARS IN WALL.
1'-0" 1'-0" 3" 2"
3"
2"

PROPERTY LINE

AS OCCURS, SEE
SURVEY DWG's.
3'-0" 3"
(2) #4 BARS IN
TOP COURSE 3"
6"
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION. 2'-6" LAP MIN 3"

VARIES, SEE
CIVIL DWG's
FOR GRADE WALL HEIGHT ABOVE GRADE PER CIVIL DWG'S 4'-0" MAX. (2) #4 BARS IN
BASE COURSE 1'-6"
EG PER

CIVIL/SURVEY
VARIES, SEE CIVIL DWG's
FG PER
CIVIL/SURVEY 32" MIN
#5 BARS @ 18" O.C.

W/ STANDARD 90°
HOOK & EXTENSION.
#5 BAR

CONTINUOUS
(3) #5 BARS LONGITUDINAL,

SPACED EVENLY

TOP & BOTTOM MAT
(TOTAL OF 6)
10"

STONE WALL CAP

PER LANDSCAPE
DWG's

TO WALL PER
CIVIL/SURVEY 3'-6"
P/L

CMU WALL SECTION
6" PER CIVIL PLANS 10" 1'-0"

CMU WALL SECTION

PER CIVIL PLANS

CMU WALL SECTION
PER CIVIL PLANS 4'-0"6" 10"

CMU WALL SECTION
PER CIVIL PLANS 4'-0" 3'-6"
odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS Know what'sbelow.

Callbefore you dig.

R 1280 E. OLIVE AVENUE MADERA, CA 93638
JUSTIN W. CAPP
CE #61393, SE #4813
1003 12th STREET, MODESTO, CA 95354
PO BOX 861, MODESTO, CA 95353
(209) 524-4774.
www.justinwcapp.com
JUSTIN W. CAPP, Inc.

ENGINEERING + DESIGN
ENGINEER:

ENGINEER'S SEAL:

S600 3/4" = 1'-0"
2 CMU WALL SECTION
2 S600

NOT FOR CONSTRUCTION
100% SUBMITTAL
S600 3/4" = 1'-0"
3 CMU WALL SECTION
S600 3/4" = 1'-0"
4 CMU WALL SECTION
S600 3/4" = 1'-0"
5 CMU WALL SECTION
S600 1/2" = 1'-0"
1 PARTIAL FOUNDATION PLAN AT STEPPED CMU BLOCK WALL (WEST)

WALL PLAN &

SECTIONS
S600
5 3
S600
4 S600
4 S600
5 S600
S600 1/2" = 1'-0"
6 PARTIAL FOUNDATION PLAN AT STEPPED CMU BLOCK WALL (SOUTH) 4 S600
5 S600
8/29/24
C.M.U. WALL PER PLAN,
FULLY GROUTED.

PLAN VIEW

REINFORCEMENT

PER PLAN EQ EQ

OPENING IN WALL,
144 in
2 MAX
PENETRATING ITEM THRU WALL: · 6" Ø MAX
· STEEL, FERROUS OR

COPPER PIPE, TUBE OR

CONDUIT

POLYURETHANE SEALANT

AROUND PERIMETER OF

PENETRATION

REINFORCED CMU

WALL PER PLAN

CERAMIC FIBER BLANKET

OR WOOL FIBER
C/L
(2) #5 BARS

VERTICAL, TYPICAL
(2) #5 BARS

VERTICAL, TYPICAL
C.M.U. WALL PER PLAN,
FULLY GROUTED.

PLAN VIEW

REINFORCEMENT

PER PLAN
#5 DOWELS AT CORNERS
MATCH HORIZ. BAR SPACING,
LAP 36" MIN. EACH DIRECTION. EQ EQ
EQ EQ 3"
3"

CLR CLR

L-CORNER BLOCK
(2) #5 BARS

VERTICAL, TYPICAL
(2) #5 BARS

VERTICAL, TYPICAL
C.M.U. WALL PER PLAN,
FULLY GROUTED.

PLAN VIEW

REINFORCEMENT

PER PLAN
#5 DOWELS AT CORNERS
MATCH HORIZ. BAR SPACING,
LAP 36" MIN. EACH DIRECTION. EQ EQ
EQ EQ 3"
3"

CLR CLR
(2) #5 BARS
VERTICAL, TYPICAL C.M.U. WALL PER PLAN,
FULLY GROUTED.

TERMINATE HORIZONTAL
BARS W/ 180° HOOK

PLAN VIEW

REINFORCEMENT

PER PLAN EQ EQ

OPENING
(2) #5 BARS HORIZONTAL,
EXTEND MINIMUM 2'-0"

BEYOND OPENING EACH
END, TYPICAL U.O.N.

C.M.U. WALL PER PLAN,
FULLY GROUTED. REINFORCEMENT

PER PLAN
EQ EQ 3"

GROUT BOND

BEAM SOLID
B.O. LINTEL

SEE ELEVATION OPENING
C.M.U. WALL PER PLAN,
FULLY GROUTED.

TERMINATE HORIZONTAL
BARS W/ 180° HOOK
(2) #5 BARS

VERTICAL, TYPICAL
#5 BAR x 30",

SMOOTH GREASED
DOWELS @ 24" O.C.

SEALANT

CERAMIC FIBER BLANKET

OR WOOL FIBER

STYROFOAM

BACKING ROD

PLAN VIEW
ELEVATION VIEW (2) #5 BARS (2) #5 BARS
#5 BAR x 30",

SMOOTH GREASED
DOWELS @ 24" O.C.
odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS Know what'sbelow.

Callbefore you dig.

R 1280 E. OLIVE AVENUE MADERA, CA 93638
JUSTIN W. CAPP
CE #61393, SE #4813
1003 12th STREET, MODESTO, CA 95354
PO BOX 861, MODESTO, CA 95353
(209) 524-4774.
www.justinwcapp.com
JUSTIN W. CAPP, Inc.

ENGINEERING + DESIGN
ENGINEER:

ENGINEER'S SEAL:

S601 NTS
1 SECTION OF PIPE UNDER FTG.

S601 NTS
2 SECTION OF PIPE PARALLEL TO FTG.

S601 NTS
3 TYPICAL CONTROL JOINT DETAIL
S601 1-1/2" = 1'-0"
4 TYPICAL CMU WALL DETAIL
S601 1-1/2" = 1'-0"
6 TYPICAL CMU WALL DETAIL AT CORNER
S601 1-1/2" = 1'-0"
7 ALT CMU WALL DETAIL AT CORNER
S601 1-1/2" = 1'-0"
8 TYPICAL CMU JAMB DETAIL AT OPENING
S601 1-1/2" = 1'-0"
9 TYPICAL CMU EXPANSION JOINT DETAIL
S601 1-1/2" = 1'-0"
10 TYPICAL CMU LINTEL DETAIL AT OPENING
S601 1-1/2" = 1'-0"
11 TYP CMU WALL PENETRATION DETAIL
12" 12"

POUR SLAB DIRECTLY ON

COMPACTED SUB-GRADE

CONCRETE SLAB THICKNESS

PER FOUNDATION PLAN
SAW-CUT JOINTS 25% OF SLAB
DEPTH WITHIN 6-12 HOURS OF POUR.

JOINT FILLER NOT REQUIRED

REBAR SIZE AND SPACING

PER FOUNDATION PLAN
1/2"Ø OILED SMOOTH DOWELS,

MATCH REINFORCING SPACING

PROVIDE A BREAK IN SLAB REBAR,
50'-0" O.C. MAXIMUM INTERVAL
SPACE JOINTS (IN FEET) 2-3 TIMES

THE SLAB THICKNESS (INCHES)
SPACE JOINTS (IN FEET) 2-3 TIMES

THE SLAB THICKNESS (INCHES)
12" MIN.

EA. SIDE FOOTING DEPTH, D

DETAIL A
60 db LAP
MIN., TYP.

NOTE:

CONSIDER FLEXIBLE JOINTS IN EACH SIDE OF
FOOTING FOR SETTLEMENTS SEE SOIL REPORT.

A

FOOTING
WIDTH 1 1/2" CLR. MIN. AROUND INSULATION
MIN. FOR PIPES OR TRENCHES
2'-0"
9"
WIDTH

FOOTING
12 10

TRENCH - OPEN OR

FILLED W/GRAVEL

FOOTING SEE

DRAWINGS

ALL PIPES AND TRENCHES

TO BE KEPT ABOVE THIS LINE

PIPES IN COMPACTED

BACK FILLED TRENCHES
1 1/2" MIN. CLEAR
OVER PIPE INS.

FOOTING REINFORCEMENT

PER PLAN REBAR STIRRUPS

PER PLAN
PROVIDE 1" MINIMUM INSULATION

AROUND PIPE, CONSIDER

FLEXIBLE JOINTS IN EACH SIDE

OF FOOTING FOR SETTLEMENTS
SEE SOIL REPORT.

ADDED REBAR TO BE

SAME AS BOTTOM

REINFORCEMENT, PER

CONTINUOUS FOOTING

NOT FOR CONSTRUCTION
100% SUBMITTAL

TYPICAL STRUCTURAL

DETAILS
S601
5 8/29/24
4'-0" 3'-6" 6"
12"Ø

CONCRETE

FOOTING

SQUARE END POST

PER CIVIL DWG'S &

LANDSCAPE DWG'S
C/L

CONCRETE PAVING,

MOW CURB OR FINISHED

GRADE PER CIVIL &

LANDSCAPE DWG'S

POST CAP PER CIVIL DWG'S
& LANDSCAPE DWG'S

TOP RAIL PER CIVIL DWG'S &

LANDSCAPE DWG'S

SECTION VIEW

PLAN VIEW
2'-0" Ø 1'-0"
C/L
NOTE:

FINISH FLOOR SHALL BE SET A
MINIMUM OF 2" ABOVE CONCRETE
SLAB OR A MINIMUM OF 4" ABOVE
GRADE AS OCCURS.

TUBE STEEL COLUMN
PER MFR DWG's
2'-0"
(24"Ø DRILLED PIER) 6'-0" 6" 4"
FIN. FLR.

C/L
FG PER

CIVIL/SURVEY
MIN 1'-6"
PER PLAN 4'-0" 3'-6" 6"
12"Ø

CONCRETE

FOOTING

SQUARE LINE POST PER CIVIL

DWG'S & LANDSCAPE DWG'S
C/L

CONCRETE PAVING, MOW CURB

OR FINISHED GRADE PER CIVIL
& LANDSCAPE DWG'S

POST CAP PER CIVIL DWG'S
& LANDSCAPE DWG'S

TOP RAIL PER CIVIL DWG'S &

LANDSCAPE DWG'S

PICKETS PER CIVIL DWG'S &
LANDSCAPE DWG'S 10'-0"

BASKETBALL POST

BY OTHERS
PAVING

CONCRETE FOOTING
2'-0"Ø
NOTES:

1. SEE PLANS FOR EXACT LOCATIONS.

2. SEE BASKETBALL STANDARD
INSTALLATION DETAIL ON ARCH DWG's
FOR MISSING INFORMATION.
4'-0" 4'-0"
odellengineering.com
1165 Scenic Drive, Suite A
Modesto, CA 95350 JAMES TAUBERT PARK LANDSCAPE IMPROVEMENT PLANS Know what'sbelow.

Callbefore you dig.

R 1280 E. OLIVE AVENUE MADERA, CA 93638
JUSTIN W. CAPP
CE #61393, SE #4813
1003 12th STREET, MODESTO, CA 95354
PO BOX 861, MODESTO, CA 95353
(209) 524-4774.
www.justinwcapp.com
JUSTIN W. CAPP, Inc.

ENGINEERING + DESIGN
ENGINEER:

ENGINEER'S SEAL:

S602 1" = 1'-0"
2 4 FOOT TALL END POST DETAIL
S602 1" = 1'-0"
3 4 FOOT TALL LINE POST DETAIL
S602 1/2" = 1'-0"
4 BASKETBALL POST FOOTING
S602 3/4" = 1'-0"
1 TYP PICNIC COVER FOOTING DTL FOOTING

DETAILS
S602
5 NOT FOR CONSTRUCTION
100% SUBMITTAL
8/29/24
ATTACHMENT 3
Letter Received by the Foundation for Fair Contracting
RE:

BID ADVISORY
Low Bidder: Taylor Backhoe Service, Inc.

Awarding Agency: City of Madera
Project: IFB 202425-22B James Taubert Park Construction Rebid FFC Case No.: 1498FR
Dear Ms. Stickman:

The Foundation for Fair Contracting (FFC) is a nonprofit organization which has been serving the public interest since 1985. The objective of the FFC is to monitor for compliance with prevailing wage and other public contracting laws relevant to the public works construction industry to ensure a fair and level playing field for all contractors. As part of this effort, we focus on informing and educating industry stakeholders when issues are identified. Unbalanced bids raise questions in regard to performance and compliance with the rules and regulations for the payment of prevailing wages and the safety and well-being of the workforce. It further opens the question of excessive future change orders, the fairness to and rights of other bidders in the bidding process, and the intent of the competitive bidding process in general.

In deference to all bidders and in order for the public interest to best be served, please enter this formal bid advisory against the above-noted contractor as a matter of public record. We respectfully request that Taylor Backhoe Service, Inc. (TBS) be rejected for the following reasons:
· ONGOING VIOLATIONS OF PREVAILING WAGE LAWS RESULTING IN WAGE THEFT TBS has numerous infractions/violations which have resulted in willful circumvention of the laws and regulations governing the payment of prevailing wages, including, but not limited to, violations resulting in wage theft and non-compliance with apprenticeship laws. TBS has engaged in this pattern of unlawful activity on various public works prevailing wage projects.

Civil Wage and Penalty Assessments have been issued to TBS by the State of California, Division of Labor Standards Enforcement (DLSE), Labor Commissioner’s office. We have provided supporting documentation for your review.

Furthermore, TBS is currently under investigation by our offices in connection with issues provided below.
§ Misclassifications resulting in underpayments.
§ Failure to comply with overtime requirements.
§ Failure to comply with apprenticeship requirements.
§ Failing to report all workers on certified payrolls.
· LISTED SUBCONTRACTOR(S) ONGOING VIOLATIONS OF PREVAILING WAGE LAWS

RESULTING IN WAGE THEFT
TBS has listed subcontractor(s) who have been found to willfully circumvent the laws and regulations governing the payment of prevailing wages, including, but not limited to, violations resulting in wage theft and non-compliance with apprenticeship laws. TBS’ subcontractor(s) have engaged in this pattern of unlawful activity on various public works prevailing wage projects. Civil Wage and Penalty Assessments have been issued to them by the State of California, Division of Labor Standards Enforcement (DLSE), Labor Commissioner’s office. Additionally, TBS has listed subcontractors who are under active investigation by the DLSE for various Labor Code violations. We have provided supporting documentation for your review.
· FAILURE TO COMPLY WITH WORKFORCE DEVELOPMENT AND FORMAL

APPRENTICESHIP PROGRAMS
TBS has not made a good faith effort to participate and invest in Local Workforce Development, nor have they participated in local hiring of workers in the community through formal and recognized pre-apprenticeship programs and formal apprenticeship programs for specific apprenticeable crafts. They have failed to request, employ, train, and pay the proper prevailing wages to apprentices.

Please contact our office with questions, comments, or clarifications.

Sincerely,
Jesse Jimenez
Executive Director
Case: 1498FR
cc:

City of Madera – Mayor and Councilmembers
Cecelia (Cece) Gallegos – Email: [email protected]
Rohi Zacharia – Email: [email protected]
Jose Rodriguez – Email: [email protected]
Steve Montes – Email: [email protected]
Anita Evans – Email: [email protected]
Elsa Mejia – Email: [email protected]
Artemio Villegas – Email: [email protected]
City of Madera – City Manager
Arnoldo Rodriguez – Email: [email protected]
Justin Bochmann
Field Representative
Foundation for Fair Contracting
3807 Pasadena Avenue, Suite 150
Sacramento, California 95821
Office (916) 487-7871; Fax (916) 487-0306; Direct (916) 541-2848 One Stop Solutions @ www.ffccalifornia.com
FREE TRAINING: FFC's 2025 conference schedule has been posted, and attendance is free to all public works stakeholders. Speakers are from the State of California, Department of Industrial Relations, Division of Labor Standards Enforcement, Office of the Director–Legal, US Department of Labor, and more. Please feel free to share with any interested parties. Details can be found at
https://www.ffccalifornia.com/registration-handouts
Public Works Education: Building better projects on time and within budget.

ATTACHMENT 4
Response Letter by Taylor Backhoe Service, Inc. dba TBS Contractors

REPORT TO CITY COUNCIL
Approved by: Council Meeting of: November 5, 2025
Agenda Number: ___________
________________________________
Joseph Hebert, Parks & Community Services Director
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:

Parks & Community Services Department Fiscal Year 2025/26 Quarter 1 Recap RECOMMENDATION:

This report is submitted to provide the City Council with an informational report on the status of the Parks & Community Services (PCS) Department Fiscal Year 2025/26 Quarter 1 Recap SUMMARY:

Staff is providing an update on Fiscal Year 2025/26 Quarter 1 (July – September 2025) accomplishments, progress, and ongoing efforts of the PCS Department. This informational update covers various divisions within the PCS Department.

DISCUSSION:

The PCS Department delivers a wide range of direct services to the public and is divided into three major operational divisions: Administration, Recreation & Community Services, and Parks Maintenance. Together, these divisions provide high-quality recreational pursuits, preservation of parks and open space areas, entertainment, and leisure services to community members of all ages.

During Quarter 1 of Fiscal Year 2025/26, staff are pleased to share the following highlights of accomplishments and progress work, presented in no particular order:

Administration
 Executed a Construction Services Agreement under Invitation for Bid (IFB) 202425-23 for the Lions Town & Country Park Trail improvements for $841,019.63 to Tosted Asphalt, Inc., with a construction contingency of up to 10 percent of the original construction agreement E-1

RETURN TO AGENDA
amount, up to $84,102. A Notice of Award and a Notice to Proceed were executed thereafter.

This project officially began construction on September 29, 2025, and is expected to run through the end of the year.
 Executed a Contractor Notice of Completion for the Frank Bergon Senior Center (FBSC) Fence Installation project was accepted on June 18, 2025. This project was made possible by Community Development Block Grant (CDBG) funding. The City received $213,558 towards improvements at the FBSC. Improvements have included exterior painting of the building, kitchen renovations, and the installation of safety perimeter fencing.  Executed Amendment No. 3 to the West Coast Arborists, Inc. Agreement for City-wide Tree Management and Maintenance Services. The amendment allowed an additional $39,900 to be added to the agreement to address maintenance needs along the medians of Mainberry Drive, West 3rd Street, and Westgate Drive. The area has approximately 150 trees that require trimming, with trimming/pruning conducted ahead of schedule to prevent limb failure and additional branch breakages.
 Awarded 3 CDBG agreements under Program Year 2025/26. o $413,317.15 towards improvements to Centennial Pool Park Complex. o $10,000 towards the construction of James Taubert Park. o $40,022.45 towards aging services and programming.
 Received confirmation from the Office of Grants and Local Services, California State Parks, of the acceptance of the Lions Town & Country Park Restroom Renovation Project. The City was awarded $177,952 towards improvements to the restroom building. The scope of work for this project included a comprehensive renovation of the restroom building interior, including the replacement of all restroom toilet fixtures and dispensers, restroom partitions, new flooring and lighting, and all plumbing connections. The exterior improvements included painting, entrance improvements, lighting, and replacement of concrete walkways.  Demolition and reconstruction of the damaged parts at the Thaddeus Sran Playground, at Centennial Park, caused by an arson incident, began in July. Since then, the park has reopened to the public. The project still has one minor part that has to be received and installed thereafter before the official completion of the project can occur. This part does not affect access to the playground or other play features.
 Received 4 bids in response to Invitation for Bids (IFB) 202425-22B for James Taubert Park Construction. Bids were due September 8, 2025. Shortly after, a bid protest was received.

Staff is currently working to address the bid protest and ensure next steps align in the best interest of the project, funding sources, and the City.  On July 2, 2025, Council approved a Consultant Services Agreement with Westwood Professional Services, Inc. for $171,205. Since then, staff have been working diligently with Westwood Professional Services, Inc., for the design and bidding packet preparation for Tozer Park. To date, Westwood has provided a conceptual plan that includes the primary grant objectives.
 Starting in July, the Administration division rolled out the new digital survey initiative designed to enhance how the City gathers feedback on parks, facilities, and recreational programming. Surveys are automatically sent via email weekly following a reservation or program. This goal is to assess the customer experience related to facility/park conditions, cleanliness, accessibility, and overall satisfaction. Some key responses collected include:
o For programming, over 67percent of participants heard about our programming via social media. Other sources noted included Friend/Word of Mouth or a Flyer/Poster. o 100 percent of respondents noted a satisfactory experience with the program they received.
o 100 percent of respondents noted programming was well-organized and communicated clearly.
o 100 percent of respondents noted park restrooms were stocked with necessary supplies such as toilet paper, soap, and trash bags.
o 100 percent of respondents noted a satisfactory response when asked about City staff’s professionalism and helpfulness during the rental process. o 100 percent of respondents noted they would rent facilities again with the City. o 80 percent of respondents noted making their park and facility rentals in person instead of by phone or online.

Parks Maintenance
 Lions Town & Country Park: Staff began preparing an area near Field #1 for the installation of batting cages.
 Rotary Park: Assisted staff with the reconstruction of dike curbing along the medians near Gateway Drive. The curb had been lifted due to tree roots, resulting in unevenness along its length.
 Tree maintenance: Staff coordinated with West Coast Arborists, Inc. on the completion of the tree trimming/pruning along Mainberry Drive, West 3rd Street, and Westgate Drive medians.  Park furnishings: Several new concrete tables were installed at Lions Town & Country Park and Sunrise Rotary Sports Complex, replacing worn-out metal tables.  Facility aesthetics: Staff continue to proactively maintain park restroom facilities through regular painting to ensure a clean environment. During this quarter, two restroom buildings at Sunrise Rotary Sports Complex received fresh paint touch-ups.  Parking lot rehabilitation: Several park and facility parking lots were resurfaced and restripped, including those at John Wells Youth Center, Sunrise Rotary Sports Complex, Millview Center, Pan-American Community Center, and Frank Bergon Senior Center.

Recreation
 Executed the Consultant Services Agreement with Madera Unified School District for the Expanded Learning Opportunities Program (ELOP) Summer Camps. The Camps took place from July 7 to 23, 2025, with students ranging from transitional kindergarten to 6th grade in attendance. The camp offered a variety of educational, recreational, and water activities to promote engagement and physical activity during the summer break.  On August 2nd, the division hosted the Street-Smart Traffic Safety Event for kids, a fun and educational program promoting bicycle and pedestrian safety. Participants engaged in games, an interactive scavenger hunt to locate traffic signs throughout the building, and other hands-on learning experiences. Children who completed the scavenger hunt received a free safety helmet, and several lucky participants won bicycles/scooters through our raffle.

The event was made possible by funding from the Madera County Department of Public Health’s CalFresh agreement with the City.
 Over 736 duplicated youth attended the Pan American Center from July to September.  Over 731 duplicated youth attended the John Wells Youth Center from July to September.

Aging Services
 Regular programming continues as scheduled. Some favorite programming that occurred in Quarter 1 of Fiscal Year 2025/26 includes:
 Bailoterapia  Pickleball Class  Tech Classes
 Chair Yoga  Walk & Weights
 The following figures reflect total participant visits to each center; individuals may be counted more than once if they attended multiple times.

Pan-American Frank Bergon
July 1,227 700
August 989 640
September 1,242 588
 Both the Frank Bergon Senior Center and Pan American Center are executing a partnership with the Fresno Madera Area Agency on Aging for a lunch program. Meals are offered Monday – Friday at 11:30 am to qualifying seniors.  Special events related to Aging Services between July and September included:

Event Date
Ice-Cream Social July 22
August Dinner Dance August 8
National Senior Day – City Council Recognition August 20 End of Summer BBQ August 29
September Dinner Dance September 12
Senior Trip to Monterey, CA September 23
Healthy Cooking Demonstration Hosted by UC Davis
Nutrition Education Extension
Wednesday in August
Educational Medicare/Medical Benefits & Renewal Support Sessions Hosted by Health Insurance Counseling & Advocacy Program
Mondays in September
Sports
 The following figures reflect the total number of participants in youth sports from July to September.

Program Participants
Tiny Tikes Football 47
Tiny Tikes Soccer 46
Tiny Tikes Multi-Sport 41
Youth Flag Football 78
 The following figures reflect the total number of participants in adult sports from July to September.

Sport Participants
Softball 13 teams/195 players
Basketball 15 teams/180 players
Adult Open Gym Volleyball Over 295 duplicated players
 The division staff has completed harassment training and CPR training.  Goals for the Sports division include:
o Creation of a volleyball tournament.
o Adding an adult men's softball on Monday nights.
o Finish Memorandum of Understanding (MOUs) with youth sport leagues for soccer and baseball leagues.
o Complete project for the installation of new batting cages at the Lions Town & Country Park.

Community & Recreation Centers (Facilities)
 The following represents the number of rentals at the centers between July and September.

Center # of rentals
Frank Bergon Senior Center 7
John Wells Youth Center 5
Pan-American Center 15
Youth Hut 1
 The Facilities division is overseeing the procurement of stage curtains for the Pan American Community Center to enhance the stage as an amenity for community use during rentals, as well as add beautification improvements to the center.  Staff is also completing maintenance of the Centennial Pool Park Complex, which has been closed to the public due to a leak issue. Staff is engaged in a sourcing exercise related to securing a vendor for the PVC pipe replacement and repair.  Assemblywoman Esmeralda Soria used the Pan American Community Center for a backto-school backpack giveaway. Over 1,000 people were in attendance.

Special Events
 Hosted a successful Annual Fall Fishing Derby, one of our most anticipated community events of the year. The event took place at the Madera Municipal Golf Course on Saturday, September 13, 2025. Participants enjoyed a day of outdoor recreation, friendly competition, and community connection. Prizes were awarded for various categories, and many families expressed appreciation for the opportunity to enjoy nature together.  Hosted a successful 4th of July Golf Tournament, also at the Madera Municipal Golf Course. The event brought in over 136 golfers. Sponsors this year were Riley’s Brewery, Kaur Dentistry, and Sugar Pine Smoke House.
 The PG&E Movies in the Park summer series successfully ran from July to August, providing an entertaining and memorable family night to the community. The series is hosted at Lions Town & Country Park on Friday evenings, screening family-friendly movies.

Madera Municipal Golf Course
 The Golf Course Advisory Committee said farewell to two of its members: Chito Romero as the Golfer/At-Large Committee Member and Karla Gran as the Service Organization Representative. The Committee welcomed two new members in August: Andy Medellin, as the Non-Golfer/At-Large Committee Member, and Dan Riley, as the Service Organization Representative.
 A total of 4,140 rounds were played in July.
 A total of 3,747 rounds were played in August.
 A total of 3,423 rounds were plated in September.

FINANCIAL IMPACT:

The preparation and presentation of this informational report does not result in any significant financial impact. While there are costs associated with the organization and execution of the community events referenced in this report, these expenses have been accounted for in the City's Fiscal Year 2025/26 budget. All activities and events were planned in alignment with the City's financial resources and were incorporated into the approved budget to ensure fiscal responsibility. As such, no additional appropriations or budget adjustments are necessary at this time.

ALTERNATIVES:

This report is for informational purposes only and no formal action is being requested.

ATTACHMENTS:

No attachments.

Madera City Council Agenda November 5, 2025
Agenda Item E-2
Informational Report on the Madera Metro Transit System (Report by Michael Lima)
There is no written report for this item.

RETURN TO AGENDA
Madera City Council Agenda
November 5, 2025
Agenda Item E-3
Informational Report on the City's Finances
(Report by Michael Lima)
There is no written report for this item.

RETURN TO AGENDA

REPORT TO CITY COUNCIL
Approved by: Council Meeting of: November 5, 2025
_________________________________ Agenda Number: ___________ Arnoldo Rodriguez, City Manager
SUBJECT:

Airport Advisory Commission (AAC) Rules of Procedure
RECOMMENDATION:

This item is being presented at the request of the City Council for discussion and information purposes only. No formal action is requested at this time.

SUMMARY:

At its October 15, 2025 meeting, the City Council requested that this item be agendized for discussion.

DISCUSSION:

The Airport Advisory Commission (AAC) is comprised of seven members who serve in an advisory capacity to the City Council on matters related to the operation, maintenance, and development of the Municipal Airport. Commission members are appointed pursuant to Section 2-3.101 of the Madera Municipal Code, which was adopted by the City Council on March 2, 2022. This action formally established the structure, membership, and purpose of the Commission.

In addition to the City’s Airport Advisory Commission (AAC), which advises the Council on matters directly related to airport operations, maintenance, and development, land use issues surrounding the airport are reviewed by the Airport Land Use Commission (ALUC). The ALUC is a County administered body responsible for ensuring that proposed land uses within the Airport Influence Area are compatible with airport operations and consistent with the adopted Airport Land Use Compatibility Plan. ALUC’s primary role is to prevent potential conflicts between airport activities and surrounding land uses to promote public safety and preserve the long-term viability of the airport.

E-4

RETURN TO AGENDA
FINANCIAL IMPACT:

There is no financial impact associated with the rules of procedure revisions. Furthermore, members of the AAC serve on a voluntary basis and do not receive any form of compensation for their service.

ATTACHMENTS:

1. Report to the City Councill dated June 15, 2022

REPORT TO CITY COUNCIL
Approved by: Council Meeting of: June 15, 2022
_________________________________
Dan Foss, Interim Public Works Director
_________________________________
Arnoldo Rodriguez, City Manager
SUBJECT:

Revisions to Airport Advisory Commission (AAC) Rules of Procedure RECOMMENDATION:

Adopt a resolution approving revised Airport Advisory Commission (AAC) Rules of Procedure SUMMARY:

During the October 22, 2021, AAC meeting, Commissioners requested a review of the rules of procedure. One of the main concerns that spurred this review was due to issues amongst the group not being able to consistently establish a quorum during the quarterly AAC meetings.

Moreover, during the January 22, 2022 AAC meeting, the Commissioners and City staff made rules of procedure recommendations regarding the membership selection process, term of office, officers, and meetings that were also in compliance with the Madera Municipal Code for commissions.

DISCUSSION:

Upon review of the rules of procedure by the AAC, the following recommendations were made in Table 1:

Agenda Number: __________ _
B-8
Therefore, these recommendations enable the AAC rules of procedure to maintain compliance the Madera Municipal Code. Furthermore, the set meeting times were in agreement with the AAC commissioners with the hopes of maintaining a consistent quorum moving forward.

FINANCIAL IMPACT:

There is no financial impact associated with the rules of procedure revisions.

CONSISTENCY WITH THE VISION MADERA 2025 PLAN:

The proposed action is not specifically addressed as part of the Vision Plan, nor is it in conflict with the Plan.

ALTERNATIVES:

If Council chooses not to adopt these rules of procedure revisions, the AAC rules of procedure will be out of compliance with the Madera Municipal Code relating to commissions. Moreover, the AAC could continue to struggle with achieving a consistent quorum if these recommendations are not approved which will also impact the ability of the AAC to be a functioning commission.

ATTACHMENTS:

1. Resolution

2. AAC Rules of Procedure
a. Exhibit A – Ordinance NO. 986 C.S.

Table 1: Rules of Procedure recommendations
Section Recommendation
Section 1. Appointment  Update per Municipal Code Section 2-3.101; Mayor makes recommendations to fill all seats
 Council approves appointments
Section 2. Term of Office  Update to reflect amended Municipal Code (The term of each AAC member shall be in accordance with Section 2-3.101 of the Madera Municipal Code)
Section 3. Officers  Change terms to remove gender references.  Election of officers to be held the first meeting of each calendar year.

Section 4. Meetings  Change meetings from once per quarter to:
 Second Tuesday of the first month of the quarter
 Meeting location at lobby at the Municipal Airport
 Meeting start time of 10:00 a.m.

RESOLUTION NO. _____

A RESOLUTION OF THE CITY COUNCIL OF MADERA, CALIFORNIA

APPROVING RULES OF PROCEDURE REVISIONS TO AIRPORT ADVISORY

COMMISSION (AAC) RULES OF PROCEDURE
WHEREAS, the AAC has made rules of procedure recommendations regarding membership, term of office, officers, and meetings; and WHEREAS, these changes need to be made in order to stay in compliance with the Madera Municipal Code for commissions; and
WHEREAS, these revisions are being implemented to establish meeting dates, institute dates for officer elections, and to remove gender specific language.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MADERA HEREBY finds, orders, and resolves as follows:

1. The above recitals are true and correct.

2. The City Council approves the AAC rules of procedure revisions.

3. This resolution is effective immediately upon adoption. * * * * * * * * * *

Page 1 ends

Adopted by City Council on 10/6/75; Revised 3/6/96-Res. No. 96-26; Revised 7/2/97-Res. No. 97-101; Revised 10/15/14-Res. No. 14-189

CITY OF MADERA

AIRPORT ADVISORY COMMISSION
Rules of Procedure

1. Appointment.

The Airport Advisory Commission (AAC) of the City of Madera shall consist of seven (7) members who shall be appointed in accordance with Section 2-3.101 of the Madera Municipal Code. A copy of that Code section is attached and incorporated by reference as Attachment A.

2. Term of Office:

The term of each AAC member shall be in accordance with Section 2-3.101 of the Madera Municipal Code. See Exhibit A.

3. Officers:

Elections to be held the first regular meeting of the calendar year. By a majority vote of a quorum present, the following officers will be elected to serve a one-year term: Chair and Vice Chair.

4. Meetings:

Meetings of the Commission to be held the second Tuesday of each quarter per calendar year, with the meeting to be held at the Madera Municipal Airport Lobby, 4020 Aviation Drive, Madera, CA 93637, starting at 10:00 a.m. Special meetings may be called at the option of the Chair or upon majority decision of the Commission membership in accordance with requirements of the Brown Act.

5. Attendance Requirements:

A. Attendance is required and failure to attend three consecutive regular as opposed to special meetings shall be considered as automatic resignation; a significant pattern of absences may also be considered grounds for removal from the Commission.

B. Members may be excused by the Chairman for authorized absences.

C. Removal and replacement of Commission members shall be by City Council action.

6. Compensation:

All members of the commission will serve without compensation; however, payment for any actual and necessary expenses incurred in the conduct of

Page 2 ends

Adopted by City Council on 10/6/75; Revised 3/6/96-Res. No. 96-26; Revised 7/2/97-Res. No. 97-101; Revised 10/15/14-Res. No. 14-189 pertinent business may be authorized by the City Council upon proper application therefor.

7. Duties and Responsibilities:

It is the intention of the City Council that the Commission will serve in an advisory capacity only to the City Council and staff on matters involving the Madera Municipal Airport. These duties shall include the following:

A. Budget – Review annually the airport financial status pertaining both to general operations and capital projects and recommend an annual budget for operational and capital improvement purposes, including methods of financing and lease arrangements.

B. Operations – Compile analytical data and comparative information involving the establishment or modification of airport fees, rates, charges, or fuel prices, ascertain the type of service to be rendered and keep abreast of developments in the aviation industry on all pertinent matters concerning airports, airport law, and aviation generally, and based upon the foregoing, review and recommend formal adoption of airport policies and operation procedures.

C. Master Planning – Review the status of the Airport Masterplan and propose periodic revisions thereto, reflective of capital expansion projects, possible financing methods, and to federal and state regulations; review and recommend on special permits and proposals, as required, that deviate from the airport development plan.

D. Land Use – Review and recommend action regarding land use surrounding the airport, as it effects aviation, both directly and indirectly.

E. Reports – At least once each year report activities to the City Council and make information available to other Commissions and Officials of the City, as required.

F. Other – Perform other related duties as directed by the City Council.

ORDINANCE NO. 986 C.S.

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF MADERA, CALIFORNIA AMENDING SECTION § 2-3.101 OF TITLE II, CHAPTER 3 OF

THE MADERA MUNICIPAL CODE RELATING TO APPOINTMENTS AND

TERMS TO CITY BOARDS, COMMITTEES, AND COMMISSIONS
THE CITY COUNCIL OF THE CITY OF MADERA DOES ORDAIN AS FOLLOWS:

SECTION 1. Section 2-3.101 of the Madera Municipal Code is amended to read as follows:
§2-3.101
Unless otherwise specifically provided by statute or a joint powers agreement, the members of all city boards, committees, and commissions shall be appointed and serve as provided herein notwithstanding any other provision of this code, City resolution, or City minute order.
(A) Appointment.
(1) The Mayor is authorized to make appointments to City boards, committees, and commissions subject to approval by the City Council. (2) For new boards, committees, and commissions comprised of seven members, the Mayor will seek nominations for appointments from each Council Member and the Mayor may make a direct appointment for the at-large seat for consideration by the Council.
(3) For existing boards, committees, and commissions comprised of seven members and as vacancies occur, the Mayor will seek a nomination to fill the vacancy from the Council Member for the Council District who originally nominated the person. The Mayor may also make one direct appointment for the seventh seat for consideration by the City Council.
(4) For boards, committees, and commissions comprised of less or more than seven members and as vacancies occur, a numerical rotation system based on district numbers will be utilized and the Mayor will seek a nomination to fill such vacancy from a Council Member who has not yet made or waived their opportunity to nominate a person to serve on the particular board, committee, or commission.

In other words, if the last nomination was from the Council Member for District 3, the Mayor will seek a nomination from the Council Member for District 4. (S) The Mayor is not required to appoint persons nominated by Council Members.

Exhibit A
(6) The Mayor will submit appointees to the City Council for consideration. (7) The City Council is authorized to approve or reject any appointment made by the Mayor.
(8) Council approval of any appointment shall be made by resolution adopted by four votes of the City Council. The appointment shall be for the remainder of an unexpired term or for a new term.
(9) Upon the City Council's determination not to approve a Mayor's appointee, the Mayor shall proceed to seek another nominee, make another appointment, and submit the appointee to the City Council for consideration and approval as set forth in this section.
(B) Term.

Each board, committee, or commission member appointed as set forth in Section (A) above shall serve a term of four years unless a different term is otherwise provided by law, or until the Council member who nominated such board, committee or commission member is no longer serving as a Council member, whichever period is less. Each appointed member shall serve until his or her successor is appointed and qualified.

SECTION 2. SEVERANCE. If any section, subsection, phrase, or clause of this ordinance is for any reason held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portions of this ordinance.

SECTION 3. ~- The City Council finds this ordinance is not a project under the California Environmental Quality Act because it can be seen with certainty that it will not have a significant effect or physical change to the environment. See Title 14, California Code of Regulations, Section 15061 (b) (3).

SECTION 4. PUBLICATION. This ordinance shall be published in accordance with the provisions of Government Code Section 36933.

Ord. No. 986 C.S.

The foregoing Ordinance No. 986 C.S. was introduced and given its first reading at a regular meeting of the City Council of the City of Madera held on the 16th day of February 2022 and adopted after a second reading at a regular meeting ofthe City Council held on 2nd day of March 2022 by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

ATTEST:

Mayor Garcia, Councilmembers Gallegos, Rodriguez, Montes, Evans, Mejia, and Villegas.

None.

None.

None.

APPROVED:

← All documents from this meeting