12100-0001\2410807v5.doc City
of MB Form
Template Approved for Use
04/01/21

CITY OF MANHATTAN BEACH

BID DOCUMENTS
PROJECT NO. P-920
BID No. E1259-21C

CITYWIDE CONCRETE REPAIRS FY21-22
Concrete Repairs / Citywide
October 2021

CITY OF MANHATTAN BEACH

PUBLIC WORKS
ADILIA MILLER, P.E.
1400 HIGHLAND AVENUE
MANHATTAN BEACH, CA 90266

Prem Kumar, City Engineer C52463

Engineer/Architect of Record Approval

12100-0001\2410807v5.doc City of MB Form NC-1

NOTICE INVITING BIDS ................................ ................................ ................................ ... NIB-1 INSTRUCTIONS TO BIDDERS ................................ ................................ ............................. I-1 CHECKLIST FOR BIDDERS ................................ ................................ ................................ .. I-6 BID ................................ ................................ ................................ ................................ ..B-1 CONTRACT ................................ ................................ ................................ ......................... C-1 PAYMENT BOND (LABOR AND MATERIALS) ................................ ................................ .... C-5 PERFORMANCE BOND ................................ ................................ ................................ ...... C-7 WARRANTY BOND ................................ ................................ ................................ ............. C-9 GENERAL PROVISIONS ................................ ................................ ................................ ... GP-1 SECTION 0. GENERAL PROVISIONS DEFINED ................................ ................ GP-1 SECTION 1. TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF
MEASURE, AND SYMBOLS ................................ ........................... GP-1 SECTION 2. SCOPE AND CONTROL OF THE WORK ................................ ....... GP-3 SECTION 3. CHANGES IN WORK ................................ ................................ ...... GP-8 SECTION 4. CONTROL OF MATERIALS ................................ .......................... GP-29 SECTION 5 UTILITIES ................................ ................................ ..................... GP-30 SECTION 6. PROSECUTION, PROGRESS AND ACCEPTANCE OF
THE WORK ................................ ................................ ................... GP-33 SECTION 7. RESPONSIBILITIES OF THE CONTRACTOR .............................. GP-39 SECTION 8. FACILITIES FOR AGENCY PERSONNEL ................................ .... GP-49 SECTION 9. MEASUREMENT AND PAYMENT ................................ ................ GP-50 SECTION 10. CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT PLAN ................................ ................................ .. GP-54 SECTION 11. ADDITIONAL TERMS ................................ ................................ ... GP-61

SPECIAL PROVISIONS
PART I: SPECIAL INSTRUCTIONS…………………………………………….SI-1
PART II: STANDARD AND SPECIAL TECHNICAL PROVISIONS…………..ST-1

12100-0001\2410807v5.doc City
of MB Form
2 Template Approved for Use
04/01/2021

APPENDIX I PROGRESS PAYMENT REQUEST FORM

APPENDIX II DAILY REPORT (TO BE COMPLETED AND SUBMITTED BY CONTRACTOR)

APPENDIX III APPLICABLE CITY STANDARD PLANS

APPENDIX IV ADA RAMP AND DRIVEWAY COMPLIANCE MEMORANDUM - TEMPLATE

APPENDIX V MONUMENT INVENTORY LIST

12100-0001\2410807v5.doc City of MB Form NIB-1

NOTICE INVITING BIDS
FOR
Citywide Concrete Repairs FY21-22 Project

Project number: P-920 Bid Number: E1259-21C
NOTICE IS HEREBY GIVEN that the City of Manhattan Beach, California (“City”) invites sealed Bids for the Project. The City will receive ELECTRONIC BIDS ONLY up to 11:00 a.m. on November 08 , 2021 , at which time the ELECTRONIC bids will be opened and posted on PlanetBids. The deadline to submit questions related to the bid documents is _October 21, 2021 at 12:00 p.m.

Bids shall be received electronically only on the PlanetBids Portal accessible through the City of Manhattan Beach Public Works Department Bid Opportunities webpage at https://www.citymb.info/departments/public-works/bid-opportunities. To submit your bid electronically and to review Bid tabulation results (“Bid Opening”), please visit the following link:
https://pbsystem.planetbids.com/portal/48136/bo/bo-detail/87281 Contract Documents in PDF format (including City Special Provisions and Project Plans, but not including Standard Plans, Standard Specifications, or Reference Specifications) shall be obtained from the link/website above.

Fee per set: $81.00
All fees listed above are non -refundable. The Contract Documents must be purchased online; they cannot be purchased or mailed from City Hall. Bidders are solely responsible for on time submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an ebid confirmation number with a time s tamp from the bid management system indicating that the bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidders shall be solely responsible for informing themselves with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidders to successfully submit electronic bids shall be at the bidders’ sole risk and no relief will be given for late and/or improperly submitted bids. Bidders experiencing any technical difficulties with the bid submission process may contact PlanetBids at (818) 992-1771. Neither the City, nor PlanetBids, makes any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission deadline.

Bids must remain valid and shall no t be subject to withdrawal for 9 0 calendar days after the Bid opening date.

SCOPE OF WORK. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Wor k will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer.

Time for completion of the Work is _249 total Working Days from the date specified in the Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials.

12100-0001\2410807v5.doc City
of MB Form
NIB-2

REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS. In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)].

PREVAILING WAGES. In accordance with Labor Code Section 1770 et seq., the Project is a “public work.” The selected Bidder (Contractor) and any Subcontractors shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations (“DIR”) regarding the prevailing rate of per diem wages. Copies of those rates are on file with the Director of Public Works and are available to any interested party upon request. The Contractor shall post a copy of the DIR’s determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR.

BONDS. Each Bid must be accompanied by a cash deposit, cashier’s check, certified check or Bidder’s Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent of the total Bid submitted. Personal or company checks are not acceptable.

Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price, as well as a warranty or maintenance Bond that is valid for one year from Project acceptance in the amount of ten percent of the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverages, within ten calendar days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law.

LICENSES. Each Bidder shall possess a valid Class _A or C8_Contractor’s license issued by the California State Contractors License Board at the time of the Bid submission, unless this Project has any federal funding, in which case the successful Bidder must possess such a license at the time of Contract award. The successful Contractor must also possess a current City business license.

RETENTION SUBSTITUTION. Five percent of any progress payment will be withheld as retention. In accordance with Public Contract Code Section 22300 and at the request and expense of the Contractor, securities equivalent to the amount withheld may be deposited with the City or with a State or federally chartered bank as escrow agent, which shall then pay such moneys to the Contractor. Upon satisfactory completion of the Project, the securities shall be returned to the Contractor. Alternatively, the Contractor may request that the City make payments of earned retentions directly to an escrow agent at the Contractor’s expense. No such substitutions shall be accepted until all related documents are approved by the City Attorney.

BIDDING PROCESS. The City reserves the right to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in its best interest.

By: _____________________________ ___________________________________ Prem Kumar, City Engineer Date

12100-0001\2410807v5.doc City
of MB Form
I-1

INSTRUCTIONS TO BIDDERS
FORM OF BID. Bids shall be made on the Bid forms found herein. Bidders shall include all forms and fill in all blank spaces, including inserting “N/A” (for not applicable) where necessary.

The Bid Schedule, Subcontractor Des ignation Form , and acknowledgement of re ceipt of Addenda, if any, shall be submitted using only the online electronic forms through the City of Manhattan Beach Public Works Department Bid Opportunities webpage link to the PlanetBids portal at https://www.citymb.info/departments/public-works/bid-opportunities. Paper copies will not be accepted. The unit prices for each Bid Item shall be properly entered in the online electronic Bid Schedule.

In addition, each Bidder must scan and submit the following documents with its electronic bid on the City’s Bid Forms.

1. Completed and Signed Contractor’s Statement

2. Completed References Form

3. Completed, Signed and Notarized Bid Bond

4. Signed and Notarized Noncollusion Declaration Form

5. Evidence satisfactory to the City indicating the capacity of the person(s) signing the Bid to bind the Bidder
Any Bid not accompanied by a Contractor’s Statement completed with all information required and bearing the signature of the Bidder’s duly authorized representative under penalty of perjury may be deemed non -responsive and rejected. If the City determines that any information provided by a Bidder in the Contractor’s Statement is false or misleading, or is so incomplete as to be false or misleading, the City may reject the Bid submitted by such Bid der as being non - responsive.

DELIVERY OF BIDS. The Bid shall be delivered by the time and date specif ied in the Notice Inviting Bid, through the City of Manhattan Beach Public Works Department Bid Opportunities webpage link to the PlanetBids portal at https://www.citymb.info/departments/public-works/bid- opportunities. Paper copies will not be accepted. Bidders are solely responsible for ensuring that their Bids are received in proper time. Accepted Bids shall become the property of the City.

AMENDED BIDS. Unauthorized conditions, limitations or provisos attached to a Bid may cause the Bid to be deemed incomplete and non-responsive.

WITHDRAWAL OF BID. A Bid may be withdrawn electronically on the PlanetBids Vendor Portal prior to the Bid submission deadline. Bids must remain valid and shall not be subject to withdrawal for 90 Days after the Bid opening date.

SUBCONTRACTORS. Each Bidder shall submit, in the electronic Bid Form provided in the City of Manhattan Beach’s Public Works Department Bid Opportunities webpage link to the PlanetBids portal at https://www.citymb.info/departments/public -works/bid-opportunities, a list of Subcontractors to be used on this Project (for work in excess of ½ of one-percent of the total bid)

12100-0001\2410807v5.doc City
of MB Form
I-2

as required by the Subletting and Subcontracting Fair Practices Act, California Public Contract Code Section 4100 et seq.

BIDDER’S SECURITY. Each Bid shall be accompanied by cash, a certified or cashier’s check payable to the City, or a satisfactory Bid Bond in favor of the City exec uted by the Bidder as principal and an admitted surety insurer as Surety, in an amount not less than ten percent of the amount set forth in the Bid. The cash, check or Bid Bond shall be given as a guarantee that, if selected, the Bidder will execute the Contract in conformity with the Contract Documents, and will provide the evidence of insurance and furnish the specified Bonds, within ten calendar days after the date of delivery of the Contract Documents to the Bidder. In case of the Bidder’s refusal or failure to do so, the City may award the Contract to the next lowest responsible bidder, and the cash, check, or Bond (as applicable) of the lowest Bidder shall be forfeited to the City to the extent permitted by law. No Bid Bond will be accepted unless i t conforms substantially to the form provided in these Contract Documents.

QUANTITIES APPROXIMATE. Any quantities shown in the Bid form or elsewhere herein shall be considered as approximations listed to serve as a general indication of the amount of Work or materials to be performed or furnished, and as basis for the Bid comparison. The City does not guarantee that the actual amounts required will correspond with those shown. As deemed necessary or convenient, the City may increase or decrease the amount of any item or portion of Work or material to be performed or furnished or omit any such item or portion, in accordance with the Contract Documents.

ADDENDA. Each Bidder shall register to become a Registered Bidder via the City of Manhattan Beach Public Works Department Bid Opportunities webpage link to the PlanetBids portal at https://www.citymb.info/departments/public-works/bid-opportunities. Addenda, if any, shall be issued via email through the PlanetBids Vendor Portal. It is the Contractor’s respon sibility to ensure the email address utilized in the Planet Bids Vendor Portal is current and accurate and it is further the Contractor’s responsibility to actively check the Portal and email for the issuance of Addenda. Bidders are responsible for ensuring that they have received any and all Addenda. It is the Bidder’s responsibility to actively check PlanetBids for Addenda or bulletin updates. Each Bidder is responsible for verifying that it has received all Addenda issued. Bidders must acknowledge receipt of all Addenda, if any . Failure to acknowledge receipt of all Addenda may cause a Bid to be deemed incomplete and non-responsive.

DISCREPANCIES IN BIDS. Each Bidder shall set forth as to each item of Work, in clearly legible words and figures, a uni t or line item Bid amount for the item in the respective spaces provided for this purpose.

In case of discrepancy between the unit price and the extended amount set forth for the item, the unit price shall prevail. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or if the unit price is the same amount as the entry in the “extended amount” column, then the amount set forth in the “extended amount” column for the item shall prevail in accordance with the following:
(1) As to lump sum items, the amount set forth in the “extended amount” column shall be the unit price.
(2) As to unit price items, the amount set forth in the “extended amount” column shall be divided by the estimated quantity for the item set forth in the Bid documents, and the price thus obtained shall be the unit price.

12100-0001\2410807v5.doc City
of MB Form
I-3

In case of discrepancy between words and figures, the words shall prevail.

COMPETENCY OF BIDDERS. In evaluating Bidder responsibility, consideration will be given not only to the financial standing, but also to the general competency of the Bidder for the performance of the Project. Each Bidder shall set forth in the designated area of the Bid form a statement of its experience. No Contract will be execute d with a Bidder that is not licensed and registered with the DIR in accordance with State law, and with any applicable specific licensing requirements specified in these Contract Documents. These licensing and registration requirements for Contractors shall also apply to all Subcontractors.

BIDDER’S EXAMINATION OF SITE AND CONTRACT DOCUMENTS. The Bidder, at its sole cost and expense, is required to carefully examine the Contract Documents and the Project site to become fully acquainted with the conditions affecting the Work. The failure of a Bidder to receive or examine any of the Contract Documents or to inspect the site shall not relieve such Bidder from any obligation relating to the Bid, the Contract, or the Work required under the Contract Documents. The City assumes no responsibility or liability to any Bidder for, nor shall the City be bound by, any understandings, oral representations or oral agreements of the City’s agents, employees or officers concerning the Contract Documents or the Work made prior to execution of the Contract. By submitting a Bid, Bidder represents: (1) that Bidder has read and understands the Contract Documents; (2) the Bid is made in compliance with the Contract Documents and is based upon the labor, materials, equipment, and systems required by the Contract Documents; (3) that Bidder understands that all labor, materials, equipment, and systems to be furnished for the Work shall be furnished for the prices bid; (4) that it has visited the Project site, familiarized itself with the local conditions under which the Work is to be performed; (5) that it is fully experienced, qualified and competent to perform the Work set forth in the Contract Documents; (6) that it shall not damage or endanger and shall preserve and protect adjacent properties; (7) that it is properly equipped, organized, and financed to perform the Work; (8) that it is properly permitted and licensed by the California Contractors State Licensing Board to perform the Work; (9) that it has familiarized itself wi th all conditions bearing upon transportation, disposal, handling, and storage of materials; (10) that it has familiarized itself with the availability of labor, water, electric power, and roads; (11) that it has familiarized itself with uncertainties of w eather, or similar physical conditions at the Project site; (12) that it has familiarized itself with the character of equipment and facilities needed preliminary to and during performance of the Work; (13) that it has familiarized itself with the staging and material storage constraints of the Project site and surrounding buildings and will confine its staging and storage operations to approved areas; and (14) that it will coordinate its construction activities with the other contractors performing work on the Project site, if any, including, but not limited to, any separate contractor retained by the City.

No information derived from an inspection of records or investigation will in any way relieve the Contractor from its obligations under the Contract Doc uments nor entitle the Contractor to any additional compensation. The Contractor shall not make any claim against the City based upon ignorance or misunderstanding of any condition of the Project site or of the requirements set forth in the Contract Documents. No claim for additional compensation will be allowed which is based on a lack of knowledge of the above items. Bidders assume all risks in connection with performance of the Work in accordance with the Contract Documents, regardless of actual conditions encountered, and waive and release the City with respect to any and all claims and liabilities in connection therewith, to the extent permitted by law.

The omission of any portion or item of Work from the Bid that is reasonably inferable from the Contract Documents is not a basis for adjustment of the Contract Price or the Contract Time.

12100-0001\2410807v5.doc City
of MB Form
I-4

DISQUALIFICATION OF BIDDERS. No Person shall be allowed to make, file or be interested in more than one Bid for the Project. A Person that has submitted a sub-bid to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other Bidders or from making a prime Bid. If there is a reason to believe that collusion exists among the Bidders, all affected Bids will be rejected.

RETURN OF BID SECURITY. The successful Bidder’s Bid security shall be held until the Contract is executed. Bid security shall be returned to the unsuccessful Bidders within a reasonable time, which in any case shal l not exceed 90 Days after the successful Bidder has signed the Contract.

AWARD OF CONTRACT. The City reserves the right to reject any or all Bids or any parts thereof or to waive any irregularities or informalities in any Bid or in the bidding. The Cont ract award, if made, will be to the lowest responsible, responsive Bidder and is anticipated to occur within 90 calendar Days after the Bid opening. The Contract award may be made after that period if the selected Bidder has not given the City written notice of the withdrawal of its Bid.

DETERMINATION OF LOWEST BIDDER IF ADDITIVE OR DEDUCTIVE ITEMS. In accordance with Public Contract Code Section 20103.8, the lowest Bid shall be determined by comparing the total Bid price of all Base Bid Items and Additive Alternate Bid Items, using the Engineer’s estimate of quantities for the Work as set forth in the Bidder’s Proposal. The amount of the contract award will be based on the available budget for the project. It may be only for the Base Bid or if the budget allows, include Additive Bid Items. In the event that any or all of the Alternate Bid Items are not awarded as part of the Contract, the City reserves the right to add any or all of the Alternate Bid Items by Change Order or Construction Change Directive at the prices set forth in the Bid.

TRENCHING. If the Project involves the construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet deep or more, then each Bidder must submit, as a Bid item, adequate sheeting, shoring, and bracing, or an equivalent method, for the protection of life or limb, which shall conform to applicable safety orders. This final submission must be accepted by the City in advance of exc avation and must include a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from caving ground during the excavation Work. If such plan varies from the shoring system standards, the plan s hall be prepared by a registered civil or structural engineer.

LISTING SUBCONTRACTORS. Each Bidder shall submit a list of the proposed Subcontractors on the Project, as required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100, et seq.).

WORK OF SUBCONTRACTORS. All Bidders are encouraged to disseminate all of the Specifications, Drawings, and other Contract Documents to all persons or entities submitting sub- bids to the Bidder.

INELIGIBLE SUBCONTRACTORS. The successful Bidder is prohibited from performing Work on the Project with any Subcontractor who is ineligible to perform work on a public works project pursuant to Sections 1777.1 or 1777.7 of the California Labor Code. By submitting a Bid, each Bidder certifies that it has investigated the eligibility of each and every listed Subcontractor and has determined that none is ineligible to perform Work pursuant to the Labor Code.

12100-0001\2410807v5.doc City
of MB Form
I-5

EXECUTION OF CONTRACT. The selected Bidder shall execute the Contract in the form included in these Contract Documents within ten calendar days from the date of delivery of the Contract Documents to the Bidder. Additionally, the selected Bidder shall also secure all insurance and Bonds as herein specified, and provide copies to the City, within ten calendar days from the date of delivery of the Contract Documents to the Bidder. Failure or refusal to execute the Contract or to conform to any of the stipulated requirements shall be just cause for the annulment of the award and forfeiture of the Bidder’s security. In such event, the City may declare the Bidder’s security forfeited to the extent permitted by law, and the City may award the Contract to the next lowest responsible Bidder or may reject all bids.

SIGNATURES. The Bidder shall execute all documents requiring signatures, and shall cause to be notarized all documents that indicate such a requirement. The Bidder shall provide evidence satisfactory to the City, such as an authenticated resolution of its board of directors or a power of attorney, indicating the capacity of the person(s) signing the Bid to bind the Bidder to the Bid and any Contract arising therefrom.

INSURANCE AND BONDS. The Contractor shall not begin Work until it has given the City evidence of all required insurance coverage (including all additional insured endorsements), a Bond guaranteeing the Contractor’s faithful performance of the Contract, and a Bond securing the payment of claims for labor and materials. Where a Contractor has entered into an agreement with a Professional Employment Organization ( PEO) to provide human resources, workers' compensation insurance, or other benefits to the Contractor's employees, the Contractor must also submit the agreement with the PEO for review by the City.

INTERPRETATION OF CONTRACT DOCUMENTS. Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the City Engineer a written request for an interpretation or correction (Request for Information or RFI) not later than the deadline to submit questions specified in the Notice Inviting Bids . Any RFI received after this date will be disregarded. All RFI’s must be submitted via the City of Manhattan Beac h Public Works Department Bid Opportunities webpage link to the PlanetBids portal at https://www.citymb.info/departments/public-works/bid-opportunities. Any interpretation or correction of the Contract Documents will be made only by a written Addendum. N o oral interpretation of any provision in the Contract Documents shall be binding.

TRADE NAMES OR EQUALS. Requests to substitute an equivalent item for a brand or trade name item must be made by written request submitted no later than ten calendar days af ter the award of contract. Requests received after this time shall not be considered. Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability.

TAXES. Except as may be otherwi se specifically provided herein, all sales and/or use taxes assessed by federal, State or local authorities on materials used or furnished by the Contractor in performing the Work shall be paid by the Contractor. The Bidder shall calculate payment for all sales, unemployment, pension and other taxes imposed by federal, State, and local law and shall include these payments in computing the Bid.

12100-0001\2410807v5.doc City
of MB Form
I-6

PROTESTS. Any protest of the award of a bid to the apparent lowest responsive and responsible bidder or other bidders must be submitted in accordance with the provisions of t he City of Manhattan Beach Public Works Department Bid Pro test Procedure Policy 2020 -1, available on the City of Manhattan Beach Public Works Depar tment Bid Opportunities webpage at https://www.citymb.info/departments/public-works/bid-opportunities.

12100-0001\2410807v5.doc City
of MB Form
I-7

CHECKLIST

BID SCHEDULE NOTICE
Registered Bidders shall utilize the electronic Bid Schedule on the City of Manhattan Beach Bid Portal with PlanetBids to enter Bid Item prices, Subcontractor List information, to acknowledge receipt of Addenda, if any, and to upload scanned copies of other required Bid Forms for submittal.

The link to register to become a Registered Bidder and
electronically bid on this Project can be found at the following address:
https://www.citymb.info/departments/public-works/bid-opportunities

12100-0001\2410807v5.doc City
of MB Form
B-1

BID

CITY OF MANHATTAN BEACH
CITYWIDE CONCRETE REPAIRS FY21-22 PROJECT
TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF MANHATTAN BEACH:

The undersigned, as Bidder, declares that: (1) this Bid is made without collusion with any other person and that the only persons or parties interested as principals are those named herein; (2) the undersigned has carefully examined the Contract Documents (including all Addenda) and the Project site; and (3) the undersigned has investigated and is satisfied as to the conditions to be encountered, the character, quality and quantities of Work to be performed, and the materials to be furnished. Furthermore, the undersigned agrees that submission of this Bid shall be conclusive evidence that such examination and investigation have been made and agrees, in the event the Contract be awarded to it, to execute the Contract with the City of Manhattan Beach to perform the Project in accordance with the Contract Documents in the time and manner therein prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus and other means necessary so to do, except as may otherwise be furnished or provided under the terms of the Contract Documents, for the following stated unit prices or lump -sum price as submitted on the Bid herein.

This Bid is made with the full knowledge of the kind, quantity, and quality of the materials and Work required and, if it is accepted by the City, the Bidder shall enter into a Contract and furnish the bonds, insurance, and other documents as required by the Contract Documents within ten calendar days after award of the Contract. The Bidder agrees that failure to execute and r eturn the Contract or the required faithful performance bond, labor and materials payment bond, warranty bond, and insurance certificates to the City within the ten calendar day period shall be sufficient cause for the rescission of the award and forfeiture of the Bid Security to the City to the extent permitted by law.

Accompanying this Bid is cash, a cashier’s check, a certified check or a Bid Bond in an amount equal to at least ten percent of the total aggregate Bid price based on the quantities shown an d the unit prices quoted. The undersigned further agrees that, should it be awarded the Contract and thereafter fail or refuse to execute the Contract and provide the required evidence of insurance and Bonds within ten calendar days after delivery of the Contract to the undersigned, then the cash, check or Bid Bond shall be forfeited to the City to the extent permitted by law.

12100-0001\2410807v5.doc City
of MB Form
B-2

CITY OF MANHATTAN BEACH

BID SCHEDULE FOR
CITYWIDE CONCRETE REPAIRS FY21-22 PROJECT
Bidder’s Name: __________________________________________________________ Bidder’s Address: __________________________________________________________ To the Honorable Mayor and Members of the City Council:

In compliance with the Notice Inviting Bids, the undersigned her eby agrees to execute the Contract to furnish all labor, materials, equipment and supplies for the Project in accordance with the Contract Documents to the satisfaction and under the direction of the City Engineer, at the following prices:

Base Bid Items as Follows:

BASE BID SCHEDULE:

ITEM
NO.

CODE DESCRIPTION UNIT ESTIMATED

QUANTITY
UNIT
PRICES

EXTENDED
AMOUNT
1 Furnish and Install
PCC Concrete Curb
and Gutter - Remove
and Replace In Kind
at Various City
Locations
LF 100 $ $
2 Furnish and Install
PCC Cross Gutter at
Various City
Locations
SF 200 $ $
3 Furnish and Install
ADA Compliant Curb
Ramp at Various City
Locations
EA 10 $ $
4 S
Custom desing curb
ramp by register Civil
Engineer to ensure
ADA Compliance
EA 10 $ $
5 Furnish and Install
PCC Concrete
Sidewalk Remove
and Replace at
Various City
Locations
SF 500 $ $

12100-0001\2410807v5.doc City
of MB Form
B-3

ITEM
NO.

CODE DESCRIPTION UNIT ESTIMATED

QUANTITY
UNIT
PRICES

EXTENDED
AMOUNT
6 Furnish and Install 6”
Residential PCC
Driveway approach
at Various City
Locations
SF 350 $ $
7 Furnish and Install 8”
Comercial PCC
Driveway approach
at Various City
Locations
SF 350 $ $
8 Furnish and Install
Concrete Pavement
Spot Repair at
Various City
Locations
SF 800 $ $
9 Furnish and Install 2’
Wide Pervious
Concrete Gutter over
6” CAB over Filter
Fabric at Various
City Locations
LF 80 $ $
10 Furnish Water
Sleeve and Cover EA 2 $ $
11 Adjust Water Valve
Cover to Grade

EA 2 $ $
12 Furnish and Install
Water Meter Box EA 2 $ $
13 Adjust Water Meter
Box to Grade EA 2 $ $
14 Adjust City-Owned
Sewer/Stormdrain
Manhole (Precast
and Brick) Frame
and Cover to Grade
in accordance with
Standard Plans for
Public Works
Construction
Standard Plan No.
205-2 and No.206-2
(Per City of
EA 2 $ $

12100-0001\2410807v5.doc City
of MB Form
B-4

ITEM
NO.

CODE DESCRIPTION UNIT ESTIMATED

QUANTITY
UNIT
PRICES

EXTENDED
AMOUNT
Manhattan Beach
MBSS-210A-0 (ST-
19) and MBFE-312A-
0 (ST-7)
15 Cold Mill Existing
Asphalt Concrete –
at Various City
Locations
SY 75 $ $
16 Furnish and Install
Asphalt Concrete 2
inches Overley Type
III C3-PG64-10 AC
Pavement
Tons 5 $ $
17 Furnish and Install
Traffic Loops Type
"D" and "E" per
Caltrans Latest Plans
and Specification
EA 2 $ $
18 S
Protect and Adjust
Monument Frames,
Covers, and Sleeves
EA 2 $ $
19 Special Project Site
Maintenance. Only
as directed by City.

LS Complete $10,000 $10,000.00

TOTAL BASE BID
SCHEDULE: $___________

ADDITIVE BID SCHEDULE A:

ITEM
NO.

CODE DESCRIPTION UNIT ESTIMATED

QUANTITY
UNIT
PRICES

EXTENDED
AMOUNT
1 Portland Cement
Concrete High Early
Strength
SF 800 $ $

TOTAL ADDITIVE BID
SCHEDULE A: $___________

NOTES:
1) In the CODE column (S) denotes a specialty item, (%) denotes progress payments for that lump sum item will be allowed based on the percentage of completion in each pay period , and (C)

12100-0001\2410807v5.doc City
of MB Form
B-5

denotes payments will be made after the completion of the lump sum item . See Subsection 9-2.1 of the General Provisions for details.
2) In the UNIT column (LS) denotes a lump sum item. See Section 9 of the General Provisions for details.
3) Estimated quantities are for the purpose of Bid comparison only; payments will be made on the basis of actual measurement of Work compl eted, except for lump sum (LS) items . For lump sum items, see Note 1. The Bid Price shall include, but not limited to, sales tax and all other applicable taxes and fees.
4) Items may be adjusted or deleted. Therefore, regardless of total actual volume (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed. The City reserves the right to not use any of the estimated quantities; and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses.

TOTAL BID PRICE IN DIGITS: $____________________
TOTAL BID PRICE IN WORDS: _________________________________________________ The undersigned certifies to have a minimum of three consecutive years of current experience in the type of Work related to the Project and that this experience is in actual operation of the firm with permanent employees performing a part of the Work as distinct from a firm operating entirely by subcontracting all phases of the Work. The undersigned also certifies to be properly licensed by the State as a contractor to perform this type of Work. The undersigned possesses California Contractor’s License
Number ____________, Class _____, which expires on _______________________.

Signature: __________________________________ Title: ___________ Date: ______

Signature: __________________________________ Title: ___________ Date: ______

12100-0001\2410807v5.doc City
of MB Form
B-6

BIDDER’S PROPOSAL – CONTRACTOR’S STATEMENT
CITYWIDE CONCRETE REPAIRS FY21-22 PROJECT
Fill out all of the following information. Attach additional sheets if necessary. (1) Bidder’s Name:
(2) If the Bidder’s name is a fictitious name, who or what is the full name of the registered owner? If the Bidder’s name is not a fictitious name, write “N/A” in the response to this question. If you are doing business under a f ictitious name, provide a copy of the filed valid Fictitious Business Name Statement.

(3) Business Address:
(4) Telephone: Email:
(5) Type of Firm – Individual, Partnership, LLC or Corporation:
(6) Corporation organized under the laws of the State of:
(7) California State Contractor’s License Number and Class:

Original Date Issued: Expiration Date:
(8) DIR Contractor Registration Number:
(9) List the name and title of the person(s) who inspected the Project site for your firm:

(10) Number of years experience the company has as a contractor in construction work:
(11) List the names, titles, addresses and telephone numbers of all individuals, firm members, partners, joint venturers, and company or corporate officers having a principal interest in this Bid:

(12) List all current and prior D.B.A.’s, aliases, and fictitious business names for any principal having interest in this Bid:

12100-0001\2410807v5.doc City
of MB Form
B-7

(13) List the dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this Bid:

(14) For all arbitrations, lawsuits, settlements and the like (in or out of court) that the company or any principal having an interest in this Bid has been involved with in the past five years:
a. List the names, addresses and telephone numbers of contact persons for the parties:

b. Briefly summarize the parties’ claims and defenses:

c. State the tribunal (e.g., Superior Court, American Arbitration Association, etc.), the matter number, and the outcome:

(15) Has the company or any pr incipal having an interest in this Bid ever had a contract terminated by the owner or agency? If yes, explain.

12100-0001\2410807v5.doc City
of MB Form
B-8

(16) Has the company or any principal having an interest in this Bid ever failed to complete a project? If yes, explain.

(17) Has the company or any principal having an interest in this Bid ever been terminated for cause, even if it was converted to a “termination of convenience”? If yes, explain.

(18) For projects that the company or any principal having an interest in this Bid has been involved with in the last five years, did you have any claims or actions:
a. By you against the owner? Circle one: Yes No
b. By the owner against you? Circle one: Yes No
c. By any outside agency or individual for labor compliance? Circle one: Yes No
d. By Subcontractors? Circle one: Yes No
e. Are any of these claims or actions unresolved or outstanding? Circle one: Yes No
If your answer is “yes” to any part or parts of this question, explain.

(19) Has the company or any of its principals ever been debarred by a ny agencies? Is yes, please explain.

12100-0001\2410807v5.doc City
of MB Form
B-9

(21) For all public agency projects in excess of $15,000.00 that you are currently working on or have worked on in the past two years, provide the following information:

Project 1 Name/Number
Project Description ___________________________________________________________ Approximate Construction Dates From: _______________ To: ____________ Agency Name:

Contact Person: Telephone:

Address:

Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.).

Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No
Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

Project 2 Name/Number
Project Description ___________________________________________________________ Approximate Construction Date From: _______________ To: ____________ Agency Name:

Contact Person: Telephone:

Address:

Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.).

12100-0001\2410807v5.doc City
of MB Form
B-10

Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No
Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

Project 3 Name/Number
Project Description ___________________________________________________________ Approximate Construction Dates From: _______________ To: ____________ Agency Name:

Contact Person: Telephone:

Address:

Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.).

Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No
Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

Project 4 Name/Number
Project Description ___________________________________________________________ Approximate Construction Dates From: _______________ To

12100-0001\2410807v5.doc City
of MB Form
B-11

Agency Name:

Contact Person: Telephone:

Address:

Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.).

Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No
Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

Project 5 Name/Number
Project Description ___________________________________________________________ Approximate Construction Dates From: _______________ To: ____________ Agency Name:

Contact Person: Telephone:

Address:

Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.).

Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No
Did the Agency file any claims against you? Circle one: Yes No

12100-0001\2410807v5.doc City
of MB Form
B-12

If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

Project 6 Name/Number
Project Description ___________________________________________________________ Approximate Construction Dates From: _______________ To: ____________ Agency Name:

Contact Person: Telephone:

Address:

Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.).

Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes No
Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

[Continue to Next Page]

12100-0001\2410807v5.doc City
of MB Form
B-13

Upon request of the City, the Bidder shall furnish evidence showing a notarized financial statement, financial data, construction experience, or other additional information.

Failure to provide truthful answers to the questions above or in the following References Form may result in the Bid being deemed non-responsive.

Urban Runoff Certification . The Bidder certifies to the City that he/she has trained his/her employees and Subcontractors, if any, for Urban Runoff management and has included sufficient sums in the Bid Price to cover such costs of training as stipulated in the most current Regional Water Quality Control Board requirements, including the Municipal Separate Storm Sewer System NPDES Permit. The Contractor is responsible for all clean up and payment of all fines levied as a result of any illegal discharge (as defined in NPDES permit) occurring as a result of the Contractor’s Work and/or operations.

I, the undersigned, certify and declare that I have read all the foregoing answers to the Bidder’s Proposal – Contractor’s Statement and know their contents. The matters stated in the Bidder’s Proposal – Contractor’s Statement answers are true of my own knowledge and belief, except as to those matters stated on information and belief, and as to those matters I believe them to be true. I declare under penalty of perjury under the laws of the State of California that the foregoing is correct.

Company

Signature:

Name:

Title:

Date:

Signature:

Name:

Title:

Date:

12100-0001\2410807v5.doc City of MB Form B-14

DESIGNATION OF SUBCONTRACTORS
[Public Contract Code Section 4104]
CITYWIDE CONCRETE REPAIRS FY21-22 PROJECT
List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of th e Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent of the Contractor’s total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent of the Contractor’s total Bid or $10,000.00, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors.

Name under which
Subcontractor is
Licensed
and Registered
CSLB License
Number(s) and
Class(es)
DIR
Contractor
Registration
Number
Address and Phone Number Type of Work
(e.g., Electrical)
Percentage of Total
Bid (e.g., 10%)*

*The percentage of the total Bid shall represent the “portion of the work” for the purposes of Public Contract Code Section 4104(b).

12100-0001\2410807v5.doc City
of MB Form
B-15

Bond No. _________

BID BOND
CITYWIDE CONCRETE REPAIRS FY21-22 PROJECT

KNOW ALL PERSONS BY THESE PRESENTS that:

WHEREAS the City of Manhattan Beach (“City”), has issued an invitation for Bids for the Work described as follows:

WHEREAS
(Name and address of Bidder)
(“Principal”), desires to submit a Bid to City for the Work.

WHEREAS, Bidders are required to furnish a form of Bidder’s security with their Bids.

NOW, THEREFORE, we, the undersigned Principal, and

(Name and address of Surety)
(“Surety”), a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of _________________________________________________ Dollars ($__________________), being not les s than ten percent of the total Bid price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal is awarded the Contract for the Work by the City and, within the time and in the manner required by the bidding specifications, enters into the written fo rm of Contract included with the bidding specifications, furnishes the required Bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials), and furnishes the required insurance coverage, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

In case suit is brought upon this instrument, Surety further agrees to pay all court costs incurred by the City in the suit and reasonable attorneys’ fees in an amount fi xed by the court. Surety hereby waives the provisions of Civil Code Section 2845.

12100-0001\2410807v5.doc City
of MB Form
B-16

IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and t hese presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated:
“Principal”
Name:

Address:

Telephone No.:

Signature:

Print Name:

Title:

Date:

Signature:

Print Name:

Title:

Date:
“Surety”
Company Name:

Address:

Telephone No.:

Signature:

Print Name:

Title:

Date:

NOTE: This Bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.

12100-0001\2410807v5.doc City
of MB Form
B-17

NONCOLLUSION DECLARATION FORM

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
[Public Contract Code Section 7106]
CITYWIDE CONCRETE REPAIRS FY21-22 PROJECT
The undersigned declares:

I am the ______________________ of ____________________, the party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham.

The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham Bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham Bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid pric e, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, Bid depository, or to any member or agent thereof, to effectuate a collusive or sham Bid, and has not paid, and will not pay, any Person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ___________ [date], at ___________________________________________ [city], ______________________ [state].

Signature:

Printed Name:

Date:

Signature:

Printed Name:

Date:

This form must be notarized.

12100-0001\2410807v5.doc City
of MB Form
B-18

ADDENDA ACKNOWLEDGMENT FORM
CITYWIDE CONCRETE REPAIRS FY21-22 PROJECT
Bidder’s Name: ____________________________________
The Bidder shall signify receipt of all Addenda here, if any:

Addendum Number Date Received Signature

If there are more Addenda than there is room in the chart above, attach another page acknowledging receipt of the Addenda.

12100-0001\2410807v5.doc City
of MB Form
C-1

CONTRACT

CITY OF MANHATTAN BEACH CONTRACT FOR
CITYWIDE CONCRETE REPAIRS CYCLE 1 (FY21-22) PROJECT
THIS CONTRACT (“Contract”) is made and entered this 21th day of Decenber, 2021 (“Effective Date”), by and between the CITY OF MANHATTAN BEACH, a California municipal corporation (“City”) and CT&T Concrete Paving Inc., a California Corporation (“Contractor”). The Contractor’s California State Contractor’s license number is 875627.

In consideration of the mutual covenants hereinafter set forth, the parties hereto agree as follows:

1. Contract Documents. The Contract Documents consist of this Contract, the Notice Inviting Bids, Instructions to Bidders, Bid (including documentation accompanying the Bid and any post- Bid documentation submitted before the Notice of Award), the Bonds, permits from regulatory agencies with jurisdiction, General Provisions, Special Provisions, Plans, Standard Plans, Standard Specifications, Reference Specifications, Addenda, Change Orders, and Supplemental Agreements. The Contract Documents are attached hereto and incorporated herein by reference.

2. Scope of Services . The Contractor shall perform and provide all materials, tools, equipment, labor, an d services necessary to complete the Work in a good and workmanlike manner for the project identified as Citywide Concrete Repairs Cycle 1 (FY21-22) (“Project”), as described in the Contract Documents.

3. Compensation.

3.1 Contract Price and Basis for Payment. In consideration for the Contractor’s full, complete, and timely performance of the Work required by the Contract Documents, the City shall pay the Contractor for the actual quantity of Work required under the Bid Items awarded by the City performed in accordance with the lump sum prices and unit prices for Bid Items, set forth in the Bidder’s Proposal submitted with the Bid. The sum of the unit prices and lump sum prices for the Bid Items, awarded by the City is $208,250 (“Contract Price”). It is understood and agreed that the quantities set forth in the Bidder’s Proposal for which unit prices are fixed are estimates only and that the City will pay and the Contractor will accept, as full payment for these items of work, the unit prices set forth in the Bidder’s Proposal multiplied by the actual number of units performed, constructed, or completed as directed by the Engineer.

3.2 Payment Procedures . Based upon applications for payment submitted by the Contractor to the City, the City shall make p ayments to the Contractor in accordance with Section 9 of the Standard Specifications, as modified by Section 9 of the General Provisions.

4. Contract Time.

4.1 Initial Notice to Proceed . The City shall issue the “Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials.” The date specified in the Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials constitutes the date of commencement of the Contract Time of _249 Working Days. The Contract Time includes the time necessary to fulfill preconstruction requirements, place the order for materials, and to complete construction of the Project (except as adjusted by subsequent Change Orders).

The Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials shall further specify that the Contractor must complete the preconstruction requirements and order

12100-0001\2410807v5.doc City
of MB Form
C-2

materials within __7 Working Days after the date of commencement of the Contract Time; this duration is part of the Contract Time.

Preconstruction requirements include, but are not limited to, the following:
 Submitting and obtaining approval of Baseline Schedule  Submitting and obtaining approval of Traffic Control Plans  Submitting an d obtaining approval of the Stormwater Pollution Prevention Plan (SWPPP)/Water Pollution Control Plan (WPCP)
 Submitting and obtaining approval of critical required submittals  Installation of the approved Project Identification Signs  Obtaining approved Permits from all applicable agencies  Obtaining a Temporary Use Permit for a construction yard, if applicable  Notifying all agencies, utilities, residents, etc., as outlined in the Contract Documents  Submitting and obtaining approval of a Project Staffing List with contact information and a Project Emergency Contact List.

4.4 Notice to Proceed with Construction . After all preconstruction requirements are met and materials have been ordered in accordance with the Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials, the City shall issue the “Notice to Proceed with Construction,” at which time the Contractor shall diligently prosecute the Work, including corrective items of Work, day to day thereafter, within the remaining Contract Time.

5. Liquidated Damages for Delay and Control of Work.

5.1 Liquidated Damages . The Contractor and the City have agreed to liquidate damages pursuant to Section 6-9 of the General Provisions.

6. Early Completion.

6.2 City Not Liable for Contractor Failur e to Achieve Early Completion . While the Contractor may schedule completion of all of the Work, or portions thereof, earlier than the Contract Time, the City is exempt from liability for and the Contractor will not be entitled to an adjustment of the Contract Sum or to any additional costs, damages, including, but not limited to, claims for extended general conditions costs, home office overhead, jobsite overhead, and management or administrative costs, or compensation whatsoever, for use of float time or for the Contractor’s inability to complete the Work earlier than the Contract Time for any reason whatsoever.

7. Work after Stop Work Notice . Any work completed by the Contractor after the issuance of a Stop Work Notice by the City shall be rejected and/or removed and replaced as specified in the applicable Section of the Special Provisions.

12100-0001\2410807v5.doc City
of MB Form
C-3

8. Antitrust Claims. In entering into this Contract, the Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of ac tion it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. § 15) or under the Cartwright Act (Business and Professions Code Section 16700 et seq.) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor without further acknowledgment by the parties.

9. Prevailing Wages. The City and the Contractor acknowledge that the Project is a public work to which prevailing wages apply.

10. Workers’ Compensation . Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In accordance with the provisions of Labor Code Section 1861, by signing thi s Contract, the Contractor certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self -insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Contract.”

11. Titles. The titles used in this Contract are for convenience only and shall in no way define, limit or describe the scope or intent of this Contract or any part of it.

12. Authority. Any person executing this Contract on behalf of the Contractor warrants and represents that he or she has the authority to execute this Contract on behalf of the Contractor and has the authority to bind the Contractor to the performance of its obligations hereunder.

13. Entire Agreement . This Contract, including the Contract Documents and any other documents incorporated herein by specific reference, represents the entire and integrated Contract between the City and the Contractor. This Contract supersedes all prior oral or written negotiations, representations or agreements. This Contract may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties that expressly refers to this Contract.

14. Counterparts. This Contract may be executed in counterpart originals, duplicate originals, or both, each of which is deemed to be an original for all purposes.

IN WITNESS WHEREOF, the parties hereto have executed this Contract the day and year first above written.

12100-0001\2410807v5.doc City
of MB Form
C-4

CITY OF MANHATTAN BEACH

By:

City Manager
ATTEST: APPROVED AS TO FORM:

By: By:

City Clerk City Attorney

Dated:
(“CONTRACTOR”)

By:

NAME TITLE

By:

NAME TITLE

PROOF OF AUTHORITY TO BIND

CONTRACTING PARTY REQUIRED

12100-0001\2410807v5.doc City
of MB Form
C-5

Bond No. __________

PAYMENT BOND
(LABOR AND MATERIALS)
KNOW ALL PERSONS BY THESE PRESENTS that:

WHEREAS the City of Manhattan Beach (“City”), State of California, has awarded to

(“Principal”)
(Name and address of Contractor)
a contract (the “Contract”) for the Work described as follows:

Citywide Concrete Repairs FY21-22 Project
WHEREAS, under the terms of the Contract, the Principal is required before entering upon the performance of the Work, to file a good and sufficient payment Bond with the City to secure the claims to which reference is made in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code.

NOW, THEREFORE, we, the undersigned Principal, and

(Name and address of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City and all contractors, subcontractors, laborers, material suppliers, and other persons employed in the performance of the Contract and referred to in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code in the penal sum of ________________________________________________________ Dollars ($___________________), for materials furnished or labor thereon of any kind, or for amou nts due under the Unemployment Insurance Act with respect to this Work or labor, that the Surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this Bond, will pay, in addition to the fa ce amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by City in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this Bond.

Upon expiration of the time within which the California Labor Commissioner may serve a civil wage and penalty assessment against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1741, and upon expiration of the time within which a joint labor management committee may commence an action against the principal, any of its subcontractors, o r both the principal and its subcontractors pursuant to Labor Code Section 1771.2, if the condition of this Bond be fully performed, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

12100-0001\2410807v5.doc City
of MB Form
C-6

The Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or the Specifications accompanying the same shall in any manner affect its obligations on this Bond, and it does hereby waive notice of any such change, extension, alteration, or addition.

IN WITNESS WHEREOF, two identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated:

“Principal”

Signature:

Print Name:

Title:

Date:

Signature:

Print Name:

Title:

Date:

(Seal)

“Surety”

Signature:

Print Name:

Title:

Date:

(Seal)

NOTE: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE BEFORE DATE OF CONTRACT. Surety companies executing Bo nds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located.

12100-0001\2410807v5.doc City
of MB Form
C-7

Bond No. __________

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS that:

WHEREAS the City of Manhattan Beach (“City”), has awarded to

(“Principal”)
(Name and address of Contractor)
a contract (the “Contract”) for the Work described as follows:

Citywide Concrete Repair FY21-22 Project
WHEREAS, Principal is required under the terms of the Contract to furnish a Bond for the faithful performance of the Contract.

NOW, THEREFORE, we, the undersigned Principal, and

,
(Name and address of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of __________________________________________________ Dollars ($_________________), this amount being not less than the total Contract Price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors executors and administrators, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, shall in all things sta nd to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Contract and any alteration thereof made as therein provided, on the Principal’s part, to be kept and performed at the time and in the manner therein sp ecified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. Surety hereby waives any statute of limitations as it applies to an action on this Bond.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or of the Work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations under this Bond, and it does hereby waive notice of any such chan ge, extension of time, alteration or addition to the terms of the Contract or to the Work or to the specifications. Surety hereby waives the provisions of California

12100-0001\2410807v5.doc City
of MB Form
C-8

Civil Code Sections 2845 and 2849. The City is the principal beneficiary of this Bond and has all rights of a party hereto.

IN WITNESS WHEREOF, two identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated:

“Principal”

Signature:

Print Name:

Title:

Date:

Signature:

Print Name:

Title:

Date:

(Seal)

“Surety”

Signature:

Print Name:

Title:

Date:

(Seal)

NOTE: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE BEFORE DATE OF CONTRACT. Surety companies executing Bo nds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located.

12100-0001\2410807v5.doc City
of MB Form
C-9

Bond No. __________

WARRANTY BOND
KNOW ALL PERSONS BY THESE PRESENTS that:

WHEREAS the City of Manhattan Beach (“City”), State of California, has awarded to

(“Principal”)
(Name and address of Contractor)
a contract (the “Contract”) for the Work described as follows:

Citywide Concrete Repair FY21-22 Project
WHEREAS, under the terms of the Contract, the Principal is required before entering upon the performance of the Work to file a good and sufficient warranty Bond with the City.

NOW, THEREFORE, we, the undersigned Principal, and

(Name and address of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of __________________________________________________ Dollars ($_______________) this amount being not less than 10% of the total Contract Price, lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, shall remedy, without cost to the City, any defects which may develop during a period of one year from the date of completion and acceptance of the work performed under the Contract, caused by defective or inferior materials or workmanship, and shall indemnify, defend and hold harmless the City, its officers, agents, and employees for any and all claims, demands, causes of action, damages, injuries, liabilities, losses, costs or expenses, including attorneys’ fees and costs of defense, which arise out of, pertain to, or relate to such defects or to the Principal’s actions or inactions in remedying such defects, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

In case suit is brought upon this bond, Surety further agrees to pay, in addition to the Penal Sum, all costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

FURTHER, Surety hereby waives the provisions of California Civil Code sections 2845 and 2849.

The City is the principal beneficiary of this bond and has all rights of a party hereto.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications

12100-0001\2410807v5.doc City
of MB Form
C-10

accompanying the same shall in anywise affect its obligations on this bon d, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work or to the specifications.

IN WITNESS WHEREOF, two identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated:

“Principal”

Signature:

Print Name:

Title:

Date:

Signature:

Print Name:

Title:

Date:

(Seal)

“Surety”

Signature:

Print Name:

Title:

Date:

(Seal)

NOTE: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE BEFORE DATE OF CONTRACT. Surety companies executing Bo nds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located.

12100-0001\2410807v5.doc City
of MB Form
C-11

CHECKLIST FOR EXECUTION OF CONTRACT
TO BE SUBMITTED BY SUCCESSFUL BIDDER:
____ Two executed copies of the Contract
____ Completed, signed and notarized Payment Bond (original) in amount of the Contract
____ Completed, signed and notarized Performance Bond (original) in amount of the Contract
____ Completed, signed and notarized Warrant y Bond (original) in the amount of 10% of the Contract
____ Workers’ Compensation Certificate with attached Certificate of Insurance ____ General Liability insurance certificate naming the City as a co-insured ____ Automobile insurance naming the City as a co-insured ____ Umbrella/Excess Liability (General aggregate) insurance certificate naming the City as a co-insured, if applicable
____ Copy of City business license, if applicable
____ Additional insured endorsement – comprehensive general liability ____ Additional insured endorsement – automobile liability ____ Additional insured endorsement – excess liability
____ Primary and Non-Contributory Endorsement- General Liability Policy ____ Waiver of Subrogation - general liability
____ Waiver of Subrogation - Worker’s Compensation

ALL SUBMITTALS WILL BE RETAINED BY CITY, EXCEPT FOR ONE COPY OF THE

FULLY EXECUTED CONTRACT

12100-0001\2410807v5.doc City
of MB Form
GP-1

GENERAL PROVISIONS
SECTION 0. GENERAL PROVISIONS DEFINED
0-1 STANDARD SPECIFICATIONS
The 2015 edition of “Standard Specifications for Public Works Construction”, including the 2016 Supplement (“Standard Specifications”), as amended by the Contract Documents, is incorporated into the Contract Documents by this reference. The Work described herein shall be done in accordance with the provisions of the Standard Specifications, as amended by the Contract Documents.
0-2 NUMBERING OF SECTIONS
The number of sections and subsections in these General Provisions are compatible with the numbering in the Standard Specifications. Subsections of architectural and/or other work may be numbered according to the Construction Specifications Institute (CSI) format. 0-3 SUPPLEMENTATION OF STANDARD SPECIFICATIONS
The Sections that follow supplement, but do not replace, the Standard Specifications, except as otherwise indicated herein. In the event of any conflict between the Standard Specifications and these General Provisions, these General Provisions shall control.

SECTION 1. TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND

SYMBOLS
The provisions below shall supplement, but not replace, those provisions in S ection 1 of the Standard Specifications.
1-2 TERMS AND DEFINITIONS
Whenever in the Standard Specifications or in the Contract Documents the following terms are used, they shall be understood to mean the following:

Agency – The City of Manhattan Beach.

Applicable Law – All State, federal, and local laws, statutes, ordinances, codes, rules, and regulations governing the Work.

Bid Item – An item of Work listed on the Bid Schedule.

Board – The City Council of the City of Manhattan Beach.

City – The City of Manhattan Beach
City Council – The City Council of the City of Manhattan Beach Contract Documents – As defined in Section 1 of the Contract.

Contract Time – The number of Working Days stated in the Contract for the completion of the Work.

12100-0001\2410807v5.doc City
of MB Form
GP-2

County – County of Los Angeles, California
Detour – A temporary route for traffic (vehicular or pedestrian) around a closed portion of a road or travelway.

Engineer – The City Engineer, acting either directly or through properly authorized agents. Such agents shall act withi n the scope of the particular duties entrusted to them.

Estimated Quantities – The quantities of Work anticipated to be performed, as set forth in the Bid Schedule, designated as units or a lump sum.

Excavation – Any operation in which earth, rock, or othe r material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, d igging, ditching, drilling, augu ring, tunneling, scraping, cable or pipe plowing and driving, or any other way (Cal. Gov.

Code § 4216).

Final Acceptance- acceptance of the Work by the City Council and direction to staff to cause recordation of the Notice of Completion, pursuant to Section 6 -8.2 of these General Provisions.

Inspector – An authorized representative of the City, assigned by the City to make inspections of Work performed by or materials supplied by the Contractor.

Major Item of Work – A bid item amount that is at least 10% of the total contract award amount.

Minor Item of Work - A bid item amount that is less than 10% of the total contract award amount.

Notice of Completion – The notice authorized by Civil Code Section 9204.

Notice to Proceed or Notice to Proceed with Construction – A written notice issued by the City to the Contractor that authorizes the Contractor to perform the Work.

Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials – A written notice issued by the City to the Contractor that authorizes the Contractor to proceed with preconstruction require ments and the acquisition or purchase of materials that are to be incorporated into the Work and establishes the date of commencement of the Contract Time.

Project – See Work.

Punch List – A list of items of Work to be completed or corrected by the Contractor in order to complete the Work as specified in the Contract Documents.

Shop Drawings – All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the Contractor, a Subcontractor, manufacturer, supplier, or distributor, which illustrate how specific portions of the Work shall be fabricated or installed.

12100-0001\2410807v5.doc City
of MB Form
GP-3

State – The State of California.

Submittal – Any drawing, calculation, specification, product data, samples, manuals, requests for substitutes, spare parts, photograph s, survey data, traffic control plans, record drawings, Bonds or similar items required to be submitted to the City under the terms of the Contract.

Work – The construction and services required by the Contract Documents, whether completed or partially com pleted, and includes all other labor, materials, equipment, services provided or to be provided by the Contractor to fulfill the Contractor’s obligations.

Working Day – See Subsection 6-7.2 of the General Provisions.

Work Directive – A unilateral written order issued by the City directing the Contractor to continue performance of the Work or a disputed item of Work pending resolution of a claim or dispute concerning the scope of Work.
1-3.3 Institutions
The institutions listed in Section 1 -3.3 of the Standard Specifications shall be supplemented by the list below:

Abbreviation Word or Words
AAN ................................ ................................ ................... American Association of Nurserymen ACI ................................ ................................ ................................ ... American Concrete Institute AGCA ................................ ................................ ....... Associated General Contractors of America APWA ................................ ................................ ................... American Public Works Association ASME ................................ ................................ ........ American Society of Mechanical Engineers CRSI ................................ ................................ ..................... Concrete Reinforcing Steel Institute CSI ................................ ................................ ........................ Construction Specifications Institute IEEE ................................ ................................ ........ Institute of Electric and Electronic Engineers NEC ................................ ................................ ................................ ........... National Electric Code NEMA ................................ ................................ .... National Electrical Manufacturers Association NFPA ................................ ................................ .................... National Fire Protection Association SSS ................................ ................................ ........... State of California Standard Specifications, Latest edition, Department of Transportation
SSP ................................ ................................ ....................... State of California Standard Plans, Latest edition, Department of Transportation
SECTION 2. SCOPE AND CONTROL OF THE WORK
The pro visions below shall supplement but not replace those provisions in Section 2 of the Standard Specifications, unless specifically noted below. 2-2 ASSIGNMENT
Any purported assignment without written consent of the City shall be null, void, and of no effect, and the Contractor shall hold harmless, defend and indemnify the City and its officers, officials, employees, agents and representatives with respect to any claim, demand or action arising from or relating to any unauthorized assignment.

12100-0001\2410807v5.doc City
of MB Form
GP-4

If the City opts to consent to assignment, the City’s consent shall be contingent upon: (1) a letter from the Surety agreeing to the assignment and assigning all of the Bonds to the assignee without any reduction, or the assignee supplying all new Bonds in the amounts originally required under the Contract Documents; and (2) the assignee supplying all of the required insurance in the amounts required in the Contract Documents. Until the Surety assigns all of the Bonds or the assignee supplies all of the new Bonds, and until the assignee supplies all of the required insurance, an assignment otherwise consented to in writing by the City shall not be effective.

Even if the City consents to assignment, no assignment shall relieve the C ontractor of liability under the Contract.
2-3 SUBCONTRACTORS
2-3.1.1 Subcontractors. Add the following sections:

Subcontractors shall be listed by the Bidder in accordance with these specifications and must be properly licensed under the laws of the Stat e of California for the type of work which they are to perform. Copies of all Subcontracts shall be made available to the Engineer, upon request. 2-3.1.2 A Subcontractor whose prosecution of the work is not satisfactory shall be terminated immediately by the Contractor upon the receipt of a written notice by the Engineer.

Subcontractors whose work was determined to be unsatisfactory shall not be allowed to perform any work on the job site.
2-3.2 Self Performance.

The following shall replace Section 2-3.2:

The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price except that any designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed will be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. “Specialty Items” will be identified by the Agency in the Bid or in the Special Provisions. Where an entire item is subcontracted, the value of work subcontracted will be based on the Contract Unit Price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the Contract Unit Price. This will be determined from informatio n submitted by the Contractor, and subject to approval by the Engineer.
2-4 CONTRACT BONDS
The Faithful Performance Bond shall remain in force until the date of recordation of the Notice of Completion. The Labor and Materials Bond shall remain in force until expiration of the time within which the California Labor Commissioner may serve a civil wage and penalty assessment against the principal, any of its Subcontractors, or both the principal and its Subcontractors pursuant to Labor Code Section 1741, and until the expiration of the time within which a joint labor management committee may commence an action against the principal, any of its Subcontractors, or both the principal and its Subcontractors pursuant to Labor Code Section 1771.2.

The warranty or maintenance Bond shall be valid for one year from the date of recordation of Notice of Completion by the County Recorder, in the amount of ten percent of the Contract Price.

12100-0001\2410807v5.doc City
of MB Form
GP-5

Other than the details listed herein, the warranty or main tenance Bond shall adhere to the requirements for Bonds in Section 2 -4 of the Standard Specifications. Nothing herein shall abridge or amend Section 6-8.3 of the Standard Specifications or the related provisions in these Contract Documents.

All Bonds must be submitted using the required forms, which are in the Contract Documents, or on any other form approved by the City Attorney.
2-5 PLANS AND SPECIFICATIONS2-5.1 General
In addition to the requirements under Section 2-5.1 in the Standard Specifications, the Contractor shall maintain a control set of Plans and Specifications on the Project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on the control set to show t he as-built conditions. This control set of Plans shall also be edited for all Addenda, Requests for Information, Change Orders, field changes not involving cost, and any other variation that occurred during construction. Upon completion of all Work, the Contractor shall return the control set to the Engineer. Final payment will not be made until this requirement is met.

Where a work feature is shown on the drawings or identified in the Specifications but is not specifically indicated as an item in the B id Schedule, and there is no ambiguity regarding the requirement to construct, install, or construct and install that work feature, the Contractor is required to complete the work feature. All costs to the Contractor for constructing, installing, or both constructing and installing such a work feature shall be included in the Bid. 2-5.2 Precedence of the Contract Documents
The following shall replace Section 2-5.2:

With regard to Section 2-5.2 in the Standard Specifications, the General Provisions shall control over the Special Provisions, and the Notice Inviting Bids and Instructions to Bidders (in that order) shall control over the Bid, such that the order of precedence shall be as follows:

1. Requirements of law.

2. Permits issued by regulatory agencies with jurisdiction.

3. Change Orders and Supplemental Agreements, whichever occurs last.

4. Contract.

5. Addenda.

6. Notice Inviting Bids.

7. Instructions to Bidders.

8. Bid/Proposal.

9. General Provisions.

10. Special Provisions.

11. Plans.

12. Standard Plans.

13. Standard Specifications.

14. Reference Specifications.
2-5.2.1 Traffic Signal Work

12100-0001\2410807v5.doc City
of MB Form
GP-6

Except as otherwise specified in the General Provisions or on the Plans, all Work relating to traffic signals and incidental illuminated street name signs and saf ety lighting, including all equipment, materials, components, and the installation thereof, shall be in accordance with the City’s Technical Provisions for traffic signals, latest edition of the State Standard Plans (SSP) in effect and published at the Bid Deadline and Section 86 “Signals, Lighting and Electrical Systems” of the latest edition of the State Standard Specifications (SSS) in effect and published at the Bid Deadline, unless otherwise indicated in the Technical Provisions. With respect to traffi c signal Work, the order of precedence, from highest to lowest, shall be: City Technical Provisions, Plans, Section 86 of the State Standard Specifications, State Standard Plans, Standard Plans, and Standard Specifications.
2-5.3 Submittals
2-5.3.1 General
The following paragraphs shall be added following the third paragraph:

The Contractor shall, at its own expense, transmit to the Engineer for review and acceptance, working drawings, shop drawings, supporting information, and/or other available instructiv e and descriptive information from the manufacturer, when and as required by the Plans or General Provisions or requested by the Engineer. Shop drawings will not be required for standard items in common use for which adequate manufacturers’ literature is available unless otherwise required by the Engineer.

The Contractor shall consecutively number, thoroughly check, approve and sign each submittal and transmit the submittals to the Engineer for review. In the event that certain submittals are submitted without the Contractor’s approval signature or are unacceptable to the City, they shall be rejected by the Engineer. The Contractor shall thereafter correct the submittals and resubmit.

In the event that in the process of development of the submittals it is discovered that there are defects and/or errors on the Plans that result in conflict between the Plans and the submittals, or if the submittals show variation from the Plans or other Contract Documents, the Contractor shall thoroughly describe and explain any defects and/or conflicts in its transmittal letter to the Engineer.

The Engineer’s review of the submittals will be for general design and arrangement only, and shall not relieve the Contractor from responsibility for errors of any sort in the submitt als or of the responsibility for executing the work in accordance with the Contract Documents. The Contractor shall allow a minimum of 20 Working Days for review of submittals. The Contractor shall be solely responsible for the correctness of the submitt als, for shop fits and field connections, and for the results obtained by use of such submittals. The Contractor shall verify and be fully responsible for all dimensions and job-site conditions affecting the Work and shall be responsible for furnishing and installing the proper materials required by the Contract Documents.

The Contract Time will not be extended due to the failure of the Contractor to provide submittals as required by the Contract Documents in a timely manner. 2-6 WORK TO BE DONE
The following paragraphs shall be added following paragraph one:

12100-0001\2410807v5.doc City
of MB Form
GP-7

All work which is defective in its construction or deficient in any of the requirements of the Plans and Specifications shall be remedied or removed and replaced by the Contractor in an acceptable manner at his own expense. No compensation will be allowed for any work done beyond the lines and grades shown on the Plans or established by the Engineer. Upon failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this article, the Engineer and the City may cause the defective work to be remedied or removed and replaced at the expense of the Contractor.

Any unauthorized or defective work, defective material or workmanship or any unfaithful or imperfect work that may be discovered before Final Acceptance of work by the Board shall be corrected immediately with no extra charge even though it may have been overlooked in previous inspections and estimates or may have been caused due to failure to inspect the work. 2-7 SUBSURFACE DATA
If the City or its consultants have made investigations of subsurface conditions in areas where the Work is to be performed, such investigations shall be deemed made only for the purpose of study and design. If a geotechnical or other report has been prepared for the Project, the Contractor may inspect the records pertaining to such investigations subject to and upon the conditions hereinafter set forth. The inspection of the records shall be made in the office of the Engineer. It is the Contractor’s sole responsibility to determine whether such investigations exist, and the City makes no affirmative or negative representation concerning the existence of such investigations.

The records of any such investigations are made available so lely for the convenience of the Contractor. It is expressly understood and agreed that the City, the Engineer, their agents, consultants or employees assume no responsibility whatsoever with respect to the sufficiency or accuracy of any investigations, the records thereof, and the interpretations set forth therein. No warranty or guarantee is expressed or implied that the conditions indicated by any such investigations or records are representative of those existing in the Project area. The Contractor agrees to make such independent investigations and examination as necessary to be satisfied of the conditions to be encountered in the performance of the Work.

The Contractor represents that it has studied the Plans, Specifications and other Contract Documents, and all surveys and investigation reports of subsurface and latent physical conditions, has made such additional surveys and investigations as necessary for the performance of the Work at the Contract Price in accordance with the requirements of the Contract Documents, and that it has correlated the results of all such data with the requirements of the Contract Documents.

No claim of any kind shall be made or allowed for any error, omission or claimed error or omission, in whole or in part, of any geot echnical exploration or any other report or data furnished or not furnished by the City.
2-9 SURVEYING
The Contractor shall verify all dimensions on the drawings and shall report to the City any discrepancies before proceeding with related Work. The Contractor shall perform all survey and layout Work per the benchmark information on the Project Plans. All surveying Work must conform to the Professional Land Surveyors’ Act (Business and Professions Code Section 8700 et seq). All Project surveying notes and “cut -sheets” are to be provided to the City after the completion of each surveying activity and all final surveying notes shall be provided before final payment to the Contractor.

12100-0001\2410807v5.doc City
of MB Form
GP-8

The Contractor is responsible for hiring a Surveyor to set survey points to be used for re - establishments of disturbed monuments and submit Corner Records to the County Surveyo r.

Copy of the submitted Corner Records must be provided to the City prior to actual disturbance of the monuments. The Contractor shall also cause all disturbed survey monuments within the project work area to be re-established at the end of the project. This also includes filing Corner Records and Record of Survey with the County Surveyor within 7 days of substantial completion of the construction work and submitting a copy to the City of the filed paperwork receipt within 2 days of submission. The Cont ractor is required to provide a copy of the County Surveyor’s acceptance within 2 days of receipt from the County Surveyor.

Construction stakes shall be set and stationed by the Contractor at its expense. Unless otherwise indicated in the Special Provisions, surveying costs shall be included in the price of items bid. No separate payment will be made. Re -staking and replacement of construction survey markers damaged as a result of the Work, vandalism, or accident shall be at the Contractor’s expense. 2-11 INSPECTION
The Contractor shall arrange and pay for all off -site inspection of the Work required by any ordinance or governing authorities. The Contractor shall also arrange and pay for other inspections, including tests in connection therewith, as may be assigned or required.

Add the following paragraphs:
2-11.1 Inspection
An inspector shall in no case act as foreman or perform other duties for the Contractor, nor interfere with the Contractor’s management of the Work. Any advice which an inspector may give the Contractor shall not be binding to the Engineer or to the City, or release the Contractor from fulfilling all the terms of the Contract.

No partial payment, inspection, taking possession of, or other act made or done by the Engineer or the City with respect to the work prior to final completion and acceptance thereof shall affect or prejudice the right of the Engineer or the City to reject any defective work or material or to require the complete fulfillment of all the provisions of the Contract.

If the Engineer deems it expedient and not in the best interest of the City to correct work injured or done not in accordance with the Contract, the defective work may be accepted subject to an equitable deduction from the Contract Price which may be made therefor by the City upon certification from the Engineer.

Reexamination of any work may be ordered by the Engineer at any time prior to Final Acceptance and, if so ordered, the work must be uncovered by the Contractor. If such work be found in accordanc e with the Contract, the City will pay the cost of reexamination and replacement. If such work be found defective or not in accordance with the Contract, the Contractor shall pay such costs.

SECTION 3. CHANGES IN WORK
3-1 CHANGES REQUESTED BY THE CONTRACTOR
3-1.1 General

12100-0001\2410807v5.doc City
of MB Form
GP-9

Add the following paragraph to the end of Subsection 3-1.1:

If the Contractor alleges that instructions issued after the date of the Contract will result in increases to the Contract Price or Contract Time, if latent or unforeseen conditio ns require modification of the Contract Documents, or the Contractor otherwise becomes aware of the need for or desirability of a change in the Work, a Change Order Proposal (“COP”) may be submitted to the City in writing, using the forms provided herein i n Subsection 3 -6.2 of the General Provisions, and must specify the reasons for such change, including relevant circumstances and impacts on the construction schedule. The Contractor may request additional compensation and/or time through a COP but not for instances that occurred more than ten calendar days prior to the COP. The Contractor’s failure to initiate a COP within such period shall be deemed a waiver of the right to adjustment of the Contract Price or the Contract Time for the alleged change, unless such waiver is prohibited under state law. Any COP that is approved by the City will be incorporated in a Change Order or Construction Change Directive. If the City determines that the Work in question is not a change, the City shall issue a Work Dir ective, ordering the Contractor to proceed with the Work without delay. If the COP is denied but the Contractor believes that it does have merit, the Contractor may submit a claim to the City. 3-2 CHANGES INITIATED BY THE AGENCY
The City reserves the right, without notice to the Surety, to increase or decrease the quantity of any item or portion of the Work described in the Contract Documents or to alter or omit portions of the Work so described, as may be deemed necessary or expedient by the Engineer, without in any way making the Contract void. Such increases, alterations or decreases of Work shall be considered and treated as though originally contracted for, and shall be subject to all the terms, conditions and provisions of the original Contract. The Contractor shall not claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease, alteration or omission of any kind of Work to be done.
3-2.1 General
Add the following paragraphs at the end of Subsection 3-2.1:

The City reserves the right to make changes in the Work, including the elimination of any Bid Item, after execution of the Contract and without invalidating the Contract by:

A. Change Order approved by the City Council, City Manager, Public Works Director, or City Engineer (dollar value of approval authority for each as per City policy); or B. Construction Change Directive approved by the City Council, City Manager, Public Works Director, or City Engineer (dollar value of approval authority for each as per City policy); A change that causes the total value of all changes to exceed the Contract contingency amount established at the time of award of the Contract must be approved by the City Council.

No payments in excess of the original Contract Price will be made until a Change Order is approved in the normal course of business. The City may, at any time, without notice to the Contractor’s surety(ies), order changes in the Work within the general scope of the Contract. Such changes in the Work shall not relieve or release the surety(ies) of its(their) obligations under the Performance and Payment Bonds issued for the Project. Changes in the Work made pursuant to this Article 3 shall in no way release any guarantee or warranty provided by the Contractor.

12100-0001\2410807v5.doc City
of MB Form
GP-10

The City may issue a Change Order Proposal Request (“COPR”), in writing, to the Contractor, describing a proposed change to the Work and requesting that the Contractor submit an itemized Change Order Proposal (“COP”) to the City, using the forms provided herei n in Subsection 3-6.2 of the General Provisions, within ten calendar days after the City’s issuance of the COPR. If the Contractor fails to submit a COP within such period of time, it shall be presumed that the change described in the City’s COPR will not result in an increase to the Contract Price or Contract Time and the change shall be performed by the Contractor without such increases.

A COPR does not authorize the Contractor to commence performance of the changed work. The Contractor shall not perfo rm any change until receipt of the City’s written approval. If the City approves the Contractor’s COP, City shall issue a Change Order.

Whenever a change is pending, the Contractor shall notify the City if it is necessary to halt other Work in the area of the change that would be affected thereby, until such time as the change is authorized.

Any change to the Contract Price shall be in a sum mutually agreed to by the Contractor and the City. When the cost for Extra Work cannot be agreed upon, the City wil l pay for Extra Work based on the accumulation of costs as provided for in Subsection 3-3, “Extra Work,” of the Standard Specifications and the General Provisions.
3-2.1.1 Change Order
A Change Order is a written instrument prepared by the City and signed by the City and the Contractor, stating their agreement upon all of the following:

A. The scope of the change in the Work;
B. The amount of the adjustment, if any, in the Contract Price; and C. The extent of the adjustment, if any, in the Contract Time. 3-2.1.1.1 Accord and Satisfaction
The Contractor’s agreement on any Change Order shall be a full compromise and settlement of all adjustments to the Contract Time and Contract Price, and compensation for any and all delay, extended or additional field and home office overhead, disruption, acceleration, inefficiencies, lost labor or equipment productivity, differing site conditions, construction interferences, and other extraordinary or consequential damages (hereinafter called “Impacts”), including any ripple or cumulative effect of the Impacts on the overall Work under the Contract arising directly or indirectly from the performance of Work described in the Change Order. By execution of any Change Order, the Contractor agrees that the Change Order constitute s a complete accord and satisfaction with respect to all claims for schedule extension, Impacts, or any costs of whatsoever nature, character or kind arising out of or incidental to the Change Order. No action, conduct, omission, product failure, or course of dealing by the City shall act to waive, modify, change, or alter the requirement that Change Orders must be in writing, signed by the City and the Contractor, and that such written Change Orders are the exclusive method for effectuating any change to the Contract Sum and/or Contract Time.
3-2.1.2 Construction Change Directive

12100-0001\2410807v5.doc City
of MB Form
GP-11

A Construction Change Directive is a written order prepared and signed by the City, directing a change in the Work prior to the Contractor’s agreement on adjustment, if any, in t he Contract Price or Contract Time, or both. The City may, by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the C ontract Price and Contract Time being adjusted accordingly. Upon receipt of a Construction Change Directive, the Contractor shall promptly proceed with the change in the Work involved. A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change Order. The City’s form of Construction Change directive is provided in Subsection 3-6.2 of the General Provisions. 3-2.2.2 Increases of More than 25 Percent
Delete Subsection 3-2.2.2 in its entirety and substitute the following:

Should the actual quantity of a Major Item of Work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications exceed the Bid quantity by more than 25%, a Change Order will be issued and payment for the quan tity in excess of 25% of the Bid quantity will be made on the basis of an adjustment to the Contract Unit price mutually agreed to by the City and the Contractor or pursuant to Subsection 3-2.4 “Agreed Prices.” For Minor Items of Work , the Contractor will be paid using the Contract Unit Price, regardless of whether the actual quantity of the Minor Item of Work covered by a Contract Unit Price exceeds the bid quantity by more than 25%.
3-2.2.3 Decreases of More than 25 Percent
Delete Subsection 3-2.2.3 in its entirety and substitute the following:

Should the actual quantity of a Major Item of Work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications be less than 75% of the Bid quantity, an adjustment in payment wil l not be made unless so requested in writing by the Contractor. If the Contractor so requests, a Change Order shall be issued and payment shall be made on the basis of an adjustment to the Contract Unit Price mutually agreed to by the City and the Contractor, or pursuant to Subsection 3-2.4 “Agreed Prices”; however, in no case will payment be less than would be made for the actual quantity at the Contract Unit Price.

For Minor Items of Work, the Contractor will be paid using the Contract Unit Price, regardless of whether the actual quantity of the Minor Item of Work covered by a Contract Unit Price is less than 75% of the Bid quantity.
3-2.2.4 Changes for Items Not Covered by Unit Prices
Payment for any change for an Item of Work not covered by a Contract Unit Price shall be made pursuant to Subsection 3-3 “Extra Work.”
3-3 EXTRA WORK
New and unforeseen work will be classified as Extra Work only when the Work is not covered and cannot be paid for under any of the various items or combination of items for which a Bid price appears on the Bid. The Contractor shall not do any Extra Work except upon written order from the Engineer.

12100-0001\2410807v5.doc City
of MB Form
GP-12

3-3.1 General
Add the following at the end of Subsection 3-3.1:

All Extra Work shall conform to the Plans and Specifications.

The Contractor shall furnish to the Engineer each Subcontractor’s signed and detailed estimate of the cost for labor, materials, and equipment, including the markup by such Subcontractor for overhead and profit for Work added or deducted to a Subcontractor’s scope of Work. The Contractor shall furnish to the Engineer the sub -Subcontractor’s signed detailed estimate of the cost for labor, materials, and equipment, including the markup by such sub - Subcontractor for overhead and profit for Work added or deducted to a sub-Subcontractor’s scope of Work. The Contractor shall furnish to the Engineer the vendor or supplier’s signed detailed estimate or quotation of the cost to the Contractor for Work added or deducted from a vendor or suppliers scope of Work.
3-3.2.1 General
Add the following at the end of Subsection 3-3.2.1
Any change in the Work for an Item of Work not covered by a Contract Unit Price that involves both added and deleted Work shall be paid on the basis of the net total cost. The cost of deleted Work not covered by a Contract Unit Price shall be determined by the Engineer based on the schedule of lump sum prices submitted by the Contractor in accordance with Subsection 9-2, “Lump Sum Work,” of the Standard Specifications and the General Provisions. 3-3.2.2.1 Labor
Delete Subsection 3-3.2.2.1 in its entirety and substitute the following:

The cost of labor will be the actual cost for wages prevailing locally for each craft or type of worker (including foreman when authorized by the Engineer) performing the Extra Work at the time the Extra Work is done, plus liab ility insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs, as well as assessments or benefits required by lawful collective bargaining agreements.

To the actual wages, as defined above, will be added a labor surch arge set forth in the California Department of Transportation publication entitled “Labor Surcharge and Equipment Rental Rates” that is in effect on the date upon which the Extra Work is performed. The labor surcharge shall constitute full compensation for all payments imposed by State and federal laws and for all other payments made to, or on behalf of, the workers, other than actual wages, subsistence and travel paid to the workers. The labor surcharge includes Workers’ Compensation, Social Security, Me dicare, Federal Unemployment, State Unemployment, and State Training taxes.

Except when direct supervision is provided by working foremen whose time is included in accordance with Subsection 3-2.2.2, the cost of direct supervision of Extra Work, when such direct supervision is provided exclusively for the Extra Work and not in conjunction with or at the same time as supervision for other Work, and when approved in advance in writing by the Engineer, may be charged to the Extra Work. Such cost includes only the actual cost of supervision labor,

12100-0001\2410807v5.doc City
of MB Form
GP-13

plus payroll taxes, insurance, and pension costs. The cost of transportation, use of vehicle, and other costs incurred by supervision will not be allowed. 3-3.2.2.2 Materials
Add the following to Subsection 3-3.2.2.2:

If the Contractor does not furnish satisfactory evidence of the cost of the materials from the actual supplier thereof within 10 days following delivery of materials to the Work site, the Engineer reserves the right to establish the cost of the materials at the lowest current wholesale prices at which the materials were available, in the quantities concerned, delivered to the location of the Work site, less any discounts.
3-3.2.2.3 Tool and Equipment Rental
Delete Subsection 3-3.2.2.3 in its entirety and substitute the following:

No payment will be made for individual pieces of equipment or tools not listed in the California Department of Transportation publication entitled “Labor Surcharge and Equipment Rental Rates” that is in effect on the date upon which the Extra Work is performed and that have a replacement value of $200.00 or less, whether or not consumed by use. Such equipment or tools shall be considered to be small tools.

The Contractor will be paid for the use of equipment at the rental rates lis ted for such equipment in the Labor Surcharge and Equipment Rental Rates publication that is in effect on the date upon which the Extra Work is performed.

Move in and out, or minimum charges other than the hourly rate, shall not apply to equipment available from the force already on the Project site.

For equipment that is rented from a local equipment agency, the Contractor will be paid at the hourly rate shown on the rental agency invoice or agreement for the time the equipment is used on Extra Work. If a minimum equipment rental amount is required by the local equipment rental agency, the actual amount charged will be paid to the Contractor.

If it is deemed necessary by the Engineer to use equipment not listed in the Labor Surcharge and Equipment Rental Rates publication, a suitable rental rate for that equipment will be established by the Engineer. The Contractor may furnish any cost data that might assist the Engineer in the establishment of the rental rate. If the rental rate established by the Engineer is $10.00 per hour or less, the provisions above concerning rental of equipment from a local equipment agency shall apply.

Rental time will not be allowed while equipment is inoperative due to breakdowns.

When owner operated equipment is used to perform Extra Work to be paid on a force account basis, the Contractor will be paid for the equipment and operator as follows:

1. Payment for the equipment will be made at the rental rates listed for such equipment in the Labor Surcharge and Equipment Rental Rates publication that is in effect on the date upon which the Extra Work is performed.

12100-0001\2410807v5.doc City
of MB Form
GP-14

2. Payment for the cost of labor will be made in conformance with the provisions in Subsection 3-3.2.2.1 “Labor” of the General Provisions. 3-3.2.3 Markup
Delete Subsection 3-3.2.3 in its entirety and substitute the following:

The markup for overhead and profit on Extra Work shall be in accordance with the following schedule.
3-3.2.3.1 Work by Contractor.

The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profit:
1) Labor ................................ ................................ ......................... 20 2) Materials ................................ ................................ ..................... 15 3) Equipment Rental ................................ ................................ ....... 15 4) Other Items and Expenditures................................ ..................... 15 To the sum of the costs and markups provided for in this subsection, one percent shall be added as compensation for bonding.
3-3.2.3.2 Work by Subcontractor.

For Extra Work performed by a Subcontractor, the markup established in Subsection 3-3.2.3.1 of the General Provisions shall be applied to the Subcontractor’s costs. An additional five percent shall be added to the Subcontractor’s final cost, which shall reimburse the Contractor for administrative costs, including overhead and profit. 3-3.2.3.3 Work by Sub-Subcontractor.

For Extra Work performed by a sub-Subcontractor, the markup established in Subsection 3-3.2.3.1 of the General Provisions shall be applied to the sub -Subcontractor’s costs. An additional ten percent shall be added to the sub -Subcontractor’s final cost, five percent of which shall reimburse the Contractor for administrative costs, including ove rhead and profit, and five percent of which shall reimburse the Subcontractor for administrative costs, including overhead and profit.
3-3.2.3.4 Work by Specialist.

If the Engineer and the Contractor agree that a service or an item of Extra Work cannot be performed by the forces of the Contractor or those of any of its Subcontractors or sub - Subcontractors, such service or Extra Work item may be performed by a specialist. Invoices for such services or items of Extra Work calculated on the basis of current market prices may be accepted without complete itemization of labor, material, and equipment rental costs when it is impracticable and not in accordance with the established practice of the special service industry to provide such complete itemization.

12100-0001\2410807v5.doc City
of MB Form
GP-15

If the Contractor is required to perform Extra Work that requires a fabrication or matching process in a fabrication or machine shop facilities away from the Project site, the charges for that portion of the Extra Work performed in such facility may, by agree ment between the Contractor and Engineer, be accepted as a specialist billing.

For Extra Work performed by a specialist, 15% shall be added to the specialist’s invoice price less a credit to the City for any cash or trade discount offered or available, whe ther or not such discount may have been taken; such percentage shall reimburse the Contractor for administrative costs, including overhead and profit.
3-3.2.3.5 Work not Covered by Unit Prices.

Markup for overhead and profit on any change in the Work for an Item of Work not covered by a Contract Unit Price that involves both added and deleted Work shall be paid, in accordance with this Subsection 3-3.2.3 of the General Provisions, only if the net cost increases the Contract Price (i.e., if the cost for added Work exceeds the cost for deleted Work). 3-3.3 Daily Reports by Contractor
Delete the first sentence of Subsection 3-3.3 and substitute the following:

The Contractor shall submit daily reports for Extra Work showing all labor, material, and equipment costs incurred.

Add the following at the end of Subsection 3-3.3:

The daily reports shall describe in detail the Extra Work that was performed and the location (station, etc.). Separate daily reports shall be submitted for Extra Work that is performed for more than one location and for different tasks that are performed on the same day. Material charges shall be substantiated by valid copies of vendor’s invoices. Such invoices shall be submitted with the daily reports, or if not available, they shall be submitted with subsequent daily reports. The Contractor shall maintain the Contractor’s records in such a manner as to provide a clear accounting of the costs.

Upon completion of the Extra Work, the Contractor shall submit a summary of costs, including markup for overhead and profit. All costs shall be in accordance with Subsection 3-3.2, “Payment,” of the Standard Specifications and the General Provisions. The signature of the City’s Inspector on a daily report shall indicate agreement with the information reflected therein, not that the Contractor is entitled to payment of the costs in the report. The Engineer shall review the daily reports. The Engineer shall compare the Inspector’s records with the completed daily reports furnished by the Contractor and make any necessary adjustments. When the daily reports are agreed upon and signed by both parties, these reports shall become the basis of payment for the Extra Work performed.
3-3.4 Extension of Time
Add the following as Subsection 3-3.4:

If the Contractor is delayed in completing the Extra Work due to a change ordered by the City, the time for completion of Work will be extended in accordance with Subsection 6 -6.1 of these General Provisions.

12100-0001\2410807v5.doc City
of MB Form
GP-16

3-5 DISPUTED WORK
Delete Subsection 3-5 in its entirety and substitute the following:

In the event of disputed Work, the City shall have the right to unilaterally issue a written Work Directive; and the Contractor shall continue performance pending resolution of the dispute and shall maintain cost data described in Subsection 3-3 of the Standard Specifications and the General Provisions. The City’s form of Work Directive is provided in Subsection 3-6 of the General Provisions. Payment shall be made for such disputed Work as is later determined by negotiation between the parties or as is fixed by a court of law.
3-6 FORMS
Add Section 3-6 to incorporate the following forms, which appear in the succeeding pages. 3-6.1 Change Order Form
3-6.2 Change Order Proposal Forms
(a) Change Order Proposal Summary Report
(b) Labor Cost Report
(c) Labor Rates Report
(d) Material Cost Report
(e) Equipment Cost Report
(f) Special Forces/Services Cost Report
3-6.3 Construction Change Directive Form
3-6.4 Work Directive Form

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-17

CITY OF MANHATTAN BEACH

PUBLIC WORKS DEPARTMENT
Engineering Division
CONTRACT CHANGE ORDER NO. 1 (Final)
PROJECT NO.:

DESCRIPTION:

TO: Construction Company, Inc.

You are hereby instructed to comply with the following changes from the Contract Plans and Specifications:

SUMMARY OF CHANGES
Description
(Detailed Explanation Attached)
Change in
Contract Price1
Change in
Work Days

1. $0.00

2. Adjustment in Final Bid Quantities $0.00
Net Change in Contract Price and Work Days $0.00
1Deduction or decrease in Contract Price is denoted in parentheses.

The following change is hereby made a part of the Contract Documents and shall be performed under the same terms and conditions as required by the original Contract Documents. Except as modified herein, the original Contract Documents and all prior amendments shall remain in full force and effect and all of the terms of the Contract Documents are hereby incorporated in this Change Order.

SUMMARY OF ALL CHANGE ORDERS
ORIGINAL CONTRACT AMOUNT .............................. $000,000.00 CCO1 (FINAL) ................................ ................................ ...... $0.00 TOTAL ................................ ................................ ........ $000,000.00

SUMMARY OF WORKING DAYS
FIRST DAY OF WORK: ................................ .......................... Date CONTRACT WORKING DAYS: ................................ ................... X TIME EXTENSION: CCO 1 (Final) ................................ .............. Y NEW TOTAL WORKING DAYS: ................................ .............. X+Y LAST DAY OF WORK: ................................ .................... New Date

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-18

CHANGE ORDER DETAIL
Change Order No.: 1 (Final)
Project No.: Description:

The changes or interpretations described and noted herein are hereby authorized. The signed original of this order is on file in the Department of Public Works. Shown as separate paragraphs:
(A) Reason for Change; (B) Description of Change; (C) Change in Contract Costs; and (D) Change in Completion Date.

Item No. 1:

A. Reason for Change:

B. Description of Change:

ITEM DESCRIPTION UNIT UNIT
PRICE
BID OR

CURRENT

APPROVED
QTY
FINAL
QTY

CHANGE CHANGE
IN COST1
New Item 0 0 0 0.00

1Deduction or decrease in Contract Price is denoted in parentheses.

C. Change in Contract Cost:

Add $0.00
D. Change in Completion Date:

Add Y Working Days
Item No. 2: Adjustment in Final Bid Quantities:

A. Reason for Change:

Due to conditions encountered during construction, modifications to the amount of Work were determined to be appropriate, and the changes were addres sed by means of adjusting applicable contract quantities, as outlined below.

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-19

B. Description of Change:

ITEM DESCRIPTION UNIT UNIT
PRICE
BID OR

CURRENT

APPROVED
QTY
FINAL
QTY

CHANGE CHANGE
IN COST1
New Item 0 0 0 0.00
1Deduction or decrease in Contract Price is denoted in parentheses.

C. Change in Contract Cost:

Add $0.00
D. Change in Completion Date:

No Change.

SIGNATURE PAGE TO FOLLOW:

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-20

The original Contract Price was ($0.00). Contract Change Order No. 1 (Final) increased the Contract Price by ($0.00). The new Contract Price will be $00/100, resulting in an increase of approximately 0.00% to the original Contract.

The original Contract Time of X Working Days was extended by Y Working Days per Change Order No. 1 (Final). The last contract Working Day is new Date.

Ordered:

Public Works Director

Date:

Concurred by:

City Engineer

Date:

Concurred by:

Project Manager

Acceptance by the Contractor:

This Change Order is in full compromise and settlement of all adjustments to Contract Time and Contract Price, and compensation for any and all delay, extended or additional field and home office overhead, disruption, acceleration, inefficiencies, lost labor or equipment productivity, differing site conditions, const ruction interferences and other extraordinary or consequential damages (hereinafter called “Impacts”), including any ripple or cumulative effect of these Impacts on the overall Work under the Contract arising directly or indirectly from the performance of Work described in this Change Order. By execution of this Change Order, the Contractor agrees that this Change Order constitutes a complete accord and satisfaction with respect to all claims for schedule extension, Impacts, or any costs of any nature, cha racter or kind arising out of or incidental to this Change Order.

Name: Date:

Title:

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-21

CHANGE ORDER PROPOSAL FORM
3-6.2(a) CONTRACT CHANGE ORDER PROPOSAL SUMMARY REPORT
Date
CCO Proposal No. Contractor
Item No. Location
AMOUNT
General Contractor

1. Labor Cost: ................................ ................................ ................................ ..... $

2. Material Cost: ................................ ................................ ................................ . $

3. Equipment Cost: ................................ ................................ ............................. $

4. Special Forces/Services: ................................ ................................ ................ $ Subtotal Contractor Cost• ................................ ................................ ........................... $

5. Subcontractor/Sub-Subcontractor Name
Labor Cost ................................ ........ $
Material Cost ................................ .... $
Equipment Cost ................................ $
Subtotal Subcontractor/Sub-Subcontractor Cost

6. Subcontractor/Sub-Subcontractor Name
Labor Cost ................................ ........ $
Material Cost ................................ .... $
Equipment Cost ................................ $
Subtotal Subcontractor/Sub-Subcontractor Cost ................................ ........................ $ TOTAL CONTRACT CHANGE ORDER COSTS ................................ ........................ $

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-22

CHANGE ORDER PROPOSAL FORM
3-6.2(b) LABOR COST REPORT Date
Date
CCO Proposal No. Contractor or Subcontractor
Item No. Location

CLASSIFICATION AND NAME HOURS
HOURLY
RATE

EXTENDED

AMOUNTS
Classification:

Name:

OT
REG
$
$
$
$
Classification:

Name:

OT
REG
$
$
$
$
Classification:

Name:

OT
REG
$
$
$
$
Classification:

Name:

OT
REG
$
$
$
$
Classification:

Name:

OT
REG
$
$
$
$
Classification:

Name:

OT
REG
$
$
$
$
TOTAL LABOR $
Overhead/profit 20% ................................ ................................ ............................... $ Total labor/overhead/profit ................................ ................................ ...................... $ Subcontractor’s mark-up of total Sub-Subcontractor
labor/overhead/profit (if applicable) 5% ................................ ................................ ... $ General contractor’s mark-up of total Subcontractor
or Sub-Subcontractor labor/overhead/profit (if applicable) 5% ................................ . $ Total ................................ ................................ ................................ ........................ $

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-23

CHANGE ORDER PROPOSAL FORM
3-6.2(c) LABOR RATES REPORT Date
Date
CCO Proposal No. Contractor or Subcontractor
Item No. Location

CLASSIFICATION:

TAXABLE BASE: AMOUNT
Base Hourly Pay $
Vacation $
TOTAL TAXABLE BASE $

TAXES & INSURANCE PERCENT AMOUNT
Social Security Tax $
State Unemployment Tax $
Federal Unemployment Tax $
Workmen’s Compensation $
Liability & Umbrella Insurance $
TOTAL TAXES & INSURANCE $

FRINGE BENEFITS AMOUNT
Pension $
Health & Welfare $
Training $
Other Fringe Benefits $
TOTAL FRINGE BENEFITS $

AMOUNT $

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-24

CHANGE ORDER PROPOSAL FORM
3-6.2(d) MATERIAL COST REPORT
Date
CCO Proposal No. Contractor or Subcontractor
Item No. Location

INVOICE
NO. DESCRIPTION AMOUNT

1. Material $
Sales Tax (Prevailing Tax Rate) 7.75% $
Subtotal $

2. Material $
Sales Tax (Prevailing Tax Rate) 7.75% $
Subtotal $

3. Material $
Sales Tax (Prevailing Tax Rate) 7.75% $
Subtotal $

SUBTOTAL MATERIAL COST $
NOTE: An itemized list of materials, manufacturers, serial numbers, invoices, and other pertinent date shall be submitted along with the material cost report.

Overhead/profit 15% ................................ ................................ ............................... $ Total material/overhead/profit ................................ ................................ .................. $ Subcontractor’s mark-up of total Sub-Subcontractor
material/overhead/profit (if applicable) 5% ................................ .............................. $ General contractor’s mark-up of total Subcontractor
or Sub-Subcontractor labor/overhead/profit (if applicable) 5% ................................ . $ Total ................................ ................................ ................................ ........................ $

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-25

CHANGE ORDER PROPOSAL FORM
3-6.2(e) EQUIPMENT COST REPORT
Date
CCO Proposal No. Contractor or Subcontractor
Item No. Location

EQUIPMENT NO.
(Description, Type, Size) HOURS HOURLY RATE

EXTENDED

AMOUNTS

SUBTOTAL EQUIPMENT COST $
Overhead/profit 15% ................................ ................................ ............................... $ Total equipment/overhead/profit ................................ ................................ .............. $ Subcontractor’s mark-up of total Sub-Subcontractor
equipment/overhead/profit (if applicable) 5% ................................ .......................... $ General contractor’s mark-up of total Subcontractor
or Sub-Subcontractor equipment/overhead/profit (if applicable) 5% ........................ $ Total ................................ ................................ ................................ ........................ $

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-26

CHANGE ORDER PROPOSAL FORM
3-6.2 (f) SPECIAL FORCES/SERVICES COST REPORT
Date
CCO Proposal No. Contractor or Subcontractor
Item No. Location

INVOICE
NO. DESCRIPTION AMOUNT

1. $
$
Subtotal $

2. $
$
Subtotal $

3. $
$
Subtotal $

SUBTOTAL MATERIAL COST $

NOTE: An itemized list of materials, manufacturers, serial numbers, invoices, and other pertinent date shall be submitted along with the special forces/services cost report.

Overhead/profit 15% ................................ ................................ ............................... $ Total Special Forces/Services/Overhead/Profit ................................ .................. $

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-27

3-6.3 CONSTRUCTION CHANGE DIRECTIVE
Distribution to: CITY

CONTRACTOR
OTHER

PROJECT MANAGER

PROJECT: DIRECTIVE NO.:

DATE:

CONTRACT DATE:

TO CONTRACTOR: CONTRACT FOR:

You are hereby directed to make the following change(s) to this Contract:

PROPOSED ADJUSTMENTS

1. The proposed basis of adjustment to the Contract Price is:
[ ] Lump Sum (increase) (decrease) of $_________________ [ ] Unit Price of $______________ per __________________ [ ] Daily time and materials records of actual costs plus a ove rhead and profit, as provided in Subsection 3 -3, “Extra Work,” the Standard Specifications and the General Provisions, [subject to a Not-To-Exceed Amount of $___________].\ [ ] as follows:

2. The Contract Time is proposed to (be adjusted) (remain unchang ed). The proposed adjustment, if any, is (an increase of ____ days) (a decrease of ____ days).

If the Contractor disagrees with the proposed adjustments, it must submit its own proposal within ten days of the date of this Construction Change Directive pursuant to Contract Documents or the proposed adjustment will become final and binding on the Contractor.

When signed by the City and received by the Contractor, this document becomes effective IMMEDIATELY as a Construction Change Directive (CCD), and the Contractor shall proceed with the change(s) described above.

Ordered:

Public Works Director
Date:

Concurred by:

City Engineer
Date:

Concurred by:

Project Manager
Date:

CITY OF MANHATTAN BEACH
Project No. P-920

12100-0001\2410807v5.doc City
of MB Form
GP-28

3-6.4 WORK DIRECTIVE
Distribution to: CITY

CONTRACTOR
FIELD
OTHER

PROJECT MANAGER

PROJECT: WORK DIRECTIVE NO.:

DATE:

CONTRACT DATE:

TO CONTRACTOR: CONTRACT FOR:

You are hereby directed to continue performance of the following Work, without delay, pending resolution of the dispute concerning such Work and maintain the cost data described in Subsection 3-3, “Extra Work,” of the Standard Specifications and the General Provisions to the Contract for the performance of such Work:

Neither the issuance of this Work Directive nor the requirement for the Contractor to maintain cost data constitutes approval by the City of a change in the Work or modification of the Co ntract Documents.

Ordered:

Public Works Director
Date:

Concurred by:

City Engineer
Date:

Concurred by:

Project Manager
Date:

12100-0001\2410807v5.doc City
of MB Form
GP-29

SECTION 4. CONTROL OF MATERIALS
4-1 MATERIALS AND WORKMANSHIP
The provisions below shall supplement but not replace those provisions in Section 4 -1 of the Standard Specifications, except that Subsection 4-1.4 shall be replaced in its entirety.

The first paragraph of Section 4-1 is replaced with the following:

Wherever applicable, materials shall conform to the latest Standards of the American Society for Testing Materials. All workmanship in the fabrication, assembly and construction of materials and equipment shall be neat and workmanlike in every respect. All equipment offered shall be of the manufacturer’s latest design.

The Contractor and all Subcontractors, suppliers, and vendors shall guarantee that the Work will meet all requirements of this Contract as to the quality of materials, equipment, and workmanship.

4.1.1.1 Property Rights in Materials
Nothing in the Contract shall be construed as vesting in the Contractor any right, title, or interest in material used in the Work after it has been attached or affixed to the Work or the soil. All such material shall become the property of the City upon being so attached or affixed. 4-1.2 Protection of Work and Materials
Add the following at the end of Subsection 4-1.2:

Materials shall not be stored in the right-of-way unless written permission is given by the Engineer.
4-1.4 Test of Materials
Delete Subsection 4-1.4 in its entirety and substitute the following:

Unless otherwise called for in these General Provisions, all testing of materials will be performed by the City in such number and at such locations as deemed necessary by the Engineer to ensure compliance with the Contract Documents. The cost of all testing that can be performed within 50 miles of the Project will be borne by the City; the cost of all testing that must be performed 50 miles or more from the Project will be borne by the Contractor; the cost of all re- testing will be borne by the Contractor, and t he amount due the City for the re -testing will be deducted from the Contract Price via Change Order.

The cost of rework material testing, overtime, travel and other related costs incurred by the City will be deducted from the Contract Price via Change Order. 4-1.6 Trade Names or Equals
If the Contractor requests to substitute an equivalent item for a brand or trade name item, the burden of proof as to the comparative quality and suitability of alternative equipment or articles or materials shall be upon the Contractor, and the Contractor shall furnish, at its own expense, all information necessary or related thereto as required by the Engineer. All requests for substitution shall be submitted, together with all documentation necessary for the Engineer to de termine

12100-0001\2410807v5.doc City
of MB Form
GP-30

equivalence, no later than ten calendar days after the award of the Contract, unless a different deadline is listed in the Special Provisions.

SECTION 5 UTILITIES
The provisions below shall supplement but not replace those provisions in Section 5 of the Standard Specifications.
5-1 LOCATION
The location and existence of any underground Utility or substructure has not been obtained. The methods used and costs involved to locate existing elements, points of connection and all construction methods are the Contractor’s sole responsibility. Accuracy of information furnished, as to existing conditions, is not guaranteed by the City. The Contractor, at its sole expense, must make all investigations necessary to determine locations of existing elements, which may include contacting Underground Service Alert and other private underground locating firm(s), utilizing specialized locating equipment, hand trenching, or both. For every Dig Alert Identification Number issued by Underground Service Alert during the course of the Project, the Contractor must submit to the City the following form. The Contractor shall be responsible for preserving the integrity of the existing underground utilities at the site.

12100-0001\2410807v5.doc City
of MB Form
GP-31

UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER FORM
CITYWIDE CONCRETE REPAIRS FY21-22

No excavation will be permitted until this form is completed and returned to the City.

Government Code Section 4216 et seq. requires a Dig Alert Identification Number to be issued before a permit to excavate will be valid.

To obtain a Dig Alert Identification Number, call Underground Service Alert at 811 a minimum of three Working Days before scheduled excavation. For best response, provide as much notice as possible up to ten Working Days.

Dig Alert Identification Number: ________________________________________________

Dated:
(“CONTRACTOR”)
By:

Printed Name:

Title:

By:

Printed Name:

Title:

NOTE: This form is required for every Dig Alert Identification Number issued by Underground Service during the course of the Work. Additional forms may be obtained from the City upon request.

12100-0001\2410807v5.doc City
of MB Form
GP-32

5-1.3 Entry by Utility Owners
The right is reserved to the owners of public Utilities or franchises to enter the Project site for the purpose of making repairs or changes in their property that may be necessary as a result of the Work as well as any other reason authorized by the City. When the Contract Documents provide for the Utility owners to alter, relocate or reconstruct a Utility, or when the Contract Documents are silent in this regard and it is determined by the Engineer that the Utility owners must alter, relocate or reconstruct a Utility, the Contractor shall schedule and allow adequate time for those alterations, relocations or reconstructions by the respective Utility owners. City employees and agents shall likewise have the right to enter upon the Project site at any time and for any reason or no reason at all.
5-2 PROTECTION
If Contractor damages or breaks the Utilities, it will be the Contractor’s responsibility to repair the Utility at no cost to the utility company or the City. If not fixed in a timely manner as deemed by the City Engineer, the utility company has the right to complete the repairs and assess the Contractor for all applicable costs.

Add the following paragraphs at the end of Subsection 5-2:

At least two Working Days prior to commencing work within the area, the Contractor shall request the utility owners to identify or otherwise indicate the location of their subsurface facilities.

It shall be the Contractor’s responsibility to determine the location and depth of all utilities including service connections which have been marked by the representative owners and which he believes may affect or be affected by the work. Full compensation for the ascertainment of utility locations and depths shall be considered included in the prices bid for the other items of work.

All utilities shall be notified by the Contractor in advance, according to their respective advance notice requirements, prior to excavating adjacent to, altering, or in any way modifying their facilities. The Contractor, at his expense, shall maintain in service all existing utilities. Should interruption of such utilities become necessary, the property owners and residents affected shall be notified 48 hours before the interruption.

The Contractor shall protect, support, or perform any other work necessary in order to maintain the operation of utilities in the proximity of the work area. The Contractor shall inform the Engineer in writing of all utilities omitted from or shown incorrectly on the contract plans. The Contractor shall not be entitled to damages or additional payment for delays attributable to utility relocations or alterations not shown or incorrectly delineated on the contract plans. The Contractor shall conduct his o perations so as to permit access to the work site by any affected utility necessary for the relocation or modification to the utility system at no cost to the City.

Any interference by the Contractor with City -owned facilities such as, but not limited to, sewer, water, or storm drain that, in the opinion of the Engineer, creates a safety or health hazard and is not quickly repaired, the damaged facilities may be repaired by City forces and all costs of repairs will be deducted from contract payments.
5-3 REMOVAL
Facilities encountered during the prosecution of the Work that are determined to be abandoned shall be removed by the Contractor as required for the Work, unless directed otherwise by the

12100-0001\2410807v5.doc City
of MB Form
GP-33

Engineer. The remaining portion of the existing Utility which is left in place shall be accurately recorded, in elevation and plan, on the control set of Contract drawings. 5-4 RELOCATION
The Contractor shall cooperate fully with all Utility forces of the City or forces of other public or private agencies engaged in the relocation, altering, or otherwise rearranging of any facilities that interfere with the progress of the Work. The Contractor shall schedule the Work so as to minimize interference with the relocation, altering, or other rearranging of facilities. 5-6 COOPERATION
The Contractor’s attention is directed to the fact that Work may be conducted at or adjacent to the site by other contractors during the performance of the Work under the Contract. The Contractor shall conduct its operations so as to cause a minimum of interference with the work of such other contractors, and shall cooperate fully with such contractors to provide continued safe access to their respective portions of the site, as required to perform work under their respective contracts. Compensation for compliance shall be included in the various items of the Work, and no additional compensation shall be allowed therefor.
5-7 NOTIFICATION
The Contractor shall notify the Engineer and the owners of all Utilities and substructures not less than 48 hours before starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or accurate:

Agency:

Phone Number:

Contact Person:

Agency:

Phone Number:

Contact Person:

Agency:

Phone Number:

Contact Person:

SECTION 6. PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK The provisions below shall supplement but not replace those provisions in Section 6 of the Standard Specifications.
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
6-1.1 Construction Schedule
In addition to the construction schedule required pursuant to Section 6 -1.1 of the Standard Specifications after notification of the Contract award and before any start of the Project, as well as the revised construction schedule in advance of beginning revised operations, the Contractor

12100-0001\2410807v5.doc City
of MB Form
GP-34

shall submit an updated construction schedule with its monthly invoice every month. Progress payments shall be contingent upon the receipt of monthly updated construction schedules.

One week before the scheduled pre -construction meeting, the Contractor must submit a construction schedule to the Engineer for review and approval. The Contractor shall make revisions as required by the Engineer. The schedule must account for all subcontract work, as well as the work of the Contractor, submittals, coordination with the other contractors performing concurrent work and the Traffic Control Plan. The Contractor shall update this Construction Schedule when directed by the Engineer, or when:
a. A Change Order significantly affects the Contract completion date or the sequence of construction approach or activities; or
b. The actual sequence of the Work, or the planned sequence of the Work, is changed and does not conform to the Contr actor’s current accepted Project construction schedule.
6-1.1.1 Pre-Construction Conference
Approximately five Days before the commencement of Work at the site, a pre -construction conference will be held at the City and shall be attended by the Contractor’s Project manager, its on-site field superintendent, and any Subcontractors that the Contractor deems appropriate.

Attendance by the Contractor and any Subcontractors designated is mandatory.

Contractor shall submit its 24-hour emergency telephone numbers to the Engineer for approval a minimum of two Working Days before the pre -construction conference. Unless previously submitted to the Engineer, the Contractor shall bring to the pre-construction conference copies of each of the following:
1) Construction Schedule.
2) Procurement schedule of major equipment and materials and items requiring long lead time.
3) Shop drawing/sample submittal schedule.
4) Preliminary schedule of values (lump sum price breakdown) for progress payment purposes.
5) Written designation of the on-site field superintendent and the Project manager.

Both daytime and emergency telephone numbers shall be included in the written designation.

The purpose of the conference is to designate responsible personnel and establish a working relationship. The parties will discuss matters requiring coordination and establish procedures for handling such matters. The complete agenda will be furnished to the Contractor before the meeting date. The Contractor shall be prepared to discuss all of the items listed below. 1) The Contractor’s construction schedule.
2) Notification of local residents before starting any Work and keeping them informed throughout the Project.
3) Procedures for transmittal, review, and distribution of the Contractor’s submittals. 4) Processing applications for payment.
5) Maintaining record documents.
6) Critical Work sequencing.

12100-0001\2410807v5.doc City
of MB Form
GP-35

7) Maintaining sewage service during construction, including proposed by-passes. 8) NPDES requirements, if any.
9) Field decisions and Change Orders.
10) Use of Project site, office and storage areas, security, housekeeping, and the City’s needs.
11) Major equipment deliveries and priorities.
12) Traffic control.
13) Any other item that the City representative states is relevant to the meeting. 6-1.1.2 Weekly Progress Meetings
Progress meetings will be held each week during the course of the Project. The meeting location, day of the week and time of day will be mutually agreed to by the City and the Contractor. The Contractor shall provide a two-week “look ahead” schedule for each meeting. The construction manager will preside at these meetings and will prepare the meeting agenda, meeting minutes and will distribute minutes to all persons in attendance. As the Work progresses, if it is determined by agreement of the attendees, that weekly meetings are not necessary, the weekly progress meetings may be changed to bi-weekly progress meetings.

Add the following to section 6-2:
6-2.1 Excess Cost of City Personnel and Inspection Personnel For any overtime or emergency wor k beyond a regular eight -hour day and for any work performed on Saturday, Sunday, or holidays, the charges for City personnel, including inspection, required on the job site shall be the responsibility of the Contractor and all costs therefor shall be deducted from the payments due the Contractor. The cost of City personnel shall be computed pursuant to adopted City salary schedules, overtime policies, fringe benefits, and overhead costs. 6-3.1 General
Add the following paragraph following paragraph one:

In the event a suspension of work is ordered because of failure on the part of the Contractor to carry out orders given or to perform any provisions of the Work, such suspension of work shall not relieve the Contractor of its responsibility to complete the work within the time limit set forth herein and shall not be considered cause for extension of the time for completion, and further, such suspension of work shall not entitle the Contractor to any additional compensation. 6-5 TERMINATION OF THE CONTRACT FOR CONVENIENCE
In addition to the reasons for termination listed in Section 6 -5 of the Standard Specifications, which allow termination upon any written notice, the City may cancel the Contract for any other reason or for no reason upon 30 Days’ written notice. The rest of the procedure outlined in Section 6-5 shall apply to such situation, including the Contractor’s required immediate notification of Subcontractors and suppliers and the payment. In no event (including termination for impossibility or impracticability, due to conditions or events beyond the control of the City, for any other reason

12100-0001\2410807v5.doc City
of MB Form
GP-36

or for no reason) shall the total amount of money to Contractor exceed the amount which would have been paid to the Contractor for the full performance of the services described in the Contract.

Furthermore, some of the City’s projects are funded in whole or in part by funds other than the City’s General Fund. If this Project is funded by such external funds in whole or in part, or if those external funds are terminated or reduced at any time and for any reason or for no reason at all, and the City determines at its discretion that no other funding is available for continuation of this Project, the City will not be obligated to continue funding for the services cont ained in these Contract Documents and may terminate the Project immediately. The City shall reimburse the Contractor for its work satisfactorily completed until the termination date. In no event shall the total amount of money to the Contractor exceed the amount which the City has received in funding from its external source. The Special Provisions may include further details in this regard. 6-6 DELAYS AND EXTENSIONS OF TIME
Unless otherwise agreed in writing, an adjustment to the Contract time by reason of a Change Order shall be agreed to at the time the Change Order is issued and accepted by the Contractor.

If the Change Order does not reserve the right of the parties, or either of them, to seek an adjustment to the Contract time, then the parties forever relinquish and waive such right and there shall be no further adjustments to the Contract time.
6-6.1 Extensions of Time
In the event it is deemed appropriate by the City to extend the time for completion of the Work, any such extension shall not release any guarantee for the Work required by the Contract Documents, nor shall any such extension of time relieve or release the Sureties on the Bonds executed. In executing such Bonds, the Sureties shall be deemed to have expressly agreed to any such extensions of time. The amount of time allowed by an extension of time shall be limited to the period of the delay giving rise to the same as determined by the City. Notwithstanding any dispute which m ay arise in connection with a claim for adjustment of the Contract time, the Contractor shall promptly proceed with the Work.
6-6.2 Payment for Delays
Notwithstanding any other terms and conditions of the Contract Documents, the City shall have no obligation whatsoever to increase the Contract Price or extend the time for delays.

Unless compensation and/or mark up is agreed upon by the City, the Contractor agrees that no payment of compensation of any kind shall be made to the Contractor for damages or increased overhead costs caused by any delays in the progress of the Contract, whether such delays are avoidable or unavoidable or caused by any act or omission of the City or its agents. Any accepted delay claim shall be fully compensated for by an extension of ti me to complete the performance of the Work.

This Section shall not apply to compensable delays caused solely by the City. If a compensable delay is caused solely by the City, the Contractor shall be entitled to a Change Order that:
(1) extends the time f or completion of the Contract by the amount of delay caused by the City; and (2) provides equitable adjustment, as determined by the City, to the Contractor.

12100-0001\2410807v5.doc City
of MB Form
GP-37

Add the following as section 6-7.2:
6-7.2 Working Day
The term “Working Day” shall mean any calend ar day except Saturdays, Sundays, and the following holidays:

New Year’s Day ................................ ....................... January 1 Martin Luther King, Jr. Day ................................ ..... 3rd Monday in January Presidents’ Day ................................ ...................... 3rd Monday in February Memorial Day ................................ ......................... Last Monday in May Independence Day ................................ ................. July 4 Labor Day ................................ ............................... 1st Monday in September Columbus Day ................................ ........................ 2nd Monday in October Veterans’ Day ................................ ......................... November 11 Thanksgiving ................................ .......................... 4th Thursday in November Friday after Thanksgiving ................................ ....... 4th Friday in November Christmas Day ................................ ........................ December 25 If a holiday falls upon a Sunday, the following Monday shall be the day the holiday is observed, and if a holiday falls upon a Saturday, the preceding Friday shall be the day the holiday is observed.
6-7.3 Contract Time Accounting
Add the following at the end of Subsection 6-7.3:

The Contract Time for completion of the Work, including corrective items of Work, shall be in accordance with Section 4 of the Contract. Contract Time extensions, when granted by the Engineer, will be in Working Days and in accordance with the Contract Documents, and will be set forth in writing via Change Order.
6-8 COMPLETION, ACCEPTANCE AND WARRANTY
The Contractor shall complete all Work under the Contract within the stipulated Working Days from the Notice to Proceed to Fulfill Preconstruction Requirements and Order Materials, as stated in the Contract. The Contractor shall not be allowed to begin any construction activity at the site before the issuance of the Notice to Proceed with Construction.

12100-0001\2410807v5.doc City
of MB Form
GP-38

6-8.2 Acceptance
The Project will not be considered complete and ready for City Council direction to staff regarding recordation of the Notice of Completion until all Work required by the Contract Documents has been fully completed in compliance with the Contract Documents and all Applicable Laws including, but not limited to, correction or completion of all punch list items , the Work site is cleaned up in accordance with Section 7-8 of the Standard Specifications, the General Provisions, and the Special Provisions, and all of the following items have been received by the Engineer:

1. A form of Notice of Completion, with all information required by the California Civil Code;

2. All written guarantees, warranties, and special warranties if applicable;

3. All “as-built” and record drawings;

4. Duly completed and executed forms of Conditional Waiver and Release On Final Payment from the Contractor, Subcontractors of any tier, suppliers, and other person eligible to file stop notices in connection with the Work; and

5. Duplicate copies of all operating instructions and manufacturer’s operating catalogs and data, together with such field instructions as necessary to fully instruct City personnel in correct operation and maintenance procedures for all equipment installed listed under the electrical, air conditioning, heating, ventilating and other trades. This data and instr uctions shall be furnished for all equipment requiring periodic adjustments, maintenance or other operation procedures.

6. The Contractor shall allow at least seven Working Days’ notice for final inspection. Such notice shall be submitted to the Engineer in writing.
6-8.3 Warranty
For the purposes of the calculation of the start of the warranty period, the Work shall be deemed to be completed upon the date of recordation of the Notice of Completion. If that direction is contingent on the completion of any items remaining on a punchlist, the Work shall be deemed to be completed upon the date of the Engineer’s acceptance of the final item(s) on that punchlist.

The Contractor shall repair or replace defective materials and workmanship as required in Section 6-8.3 of the Standard Specification at its own expense. Additionally, the Contractor agrees to defend, indemnify and hold the City harmless from claims of any kind arising from damage, injury or death due to such defects.

The parties agree that no certificate given shall be conclusive evidence of the faithful performance of the Contract, either in whole or in part, and that no payment shall be construed to be in acceptance of any defective Work or improper materials. Further, the certificate or final payment shall not terminate the Contractor’s obligations under the warranty herein. The Contractor agrees that payment of the amount due under the Contract and the adjustments and payments due for any Work done in accordance with any alterations of the same, shall rel ease the City, the City Council and its officers and employees from any and all claims or liability on account of Work performed under the Contract or any alteration thereof.

12100-0001\2410807v5.doc City
of MB Form
GP-39

6-9 LIQUIDATED DAMAGES
For the purposes of the calculation of the start of the liquid ated damages, the Work shall be deemed to be completed when the same has been completed in accordance with the Plans and Specifications therefor and to the satisfaction of the Engineer, and the Engineer has certified such completion in accordance with Sect ion 6 -8.1 of the Standard Specifications. The liquidated damages value is hereby amended to be $125 per day.

SECTION 7. RESPONSIBILITIES OF THE CONTRACTOR
The first paragraph of Section 7-3.1 of the Standard Specifications shall not be incorporated and shall instead be replaced with the following:

The Contractor shall provide and maintain insurance naming the City, its elected and appointed officials, officers, employees, attorneys, agents, designated volunteers, and independent contractors in the role of City officials as insureds or additional insureds regardless of any inconsistent statement in the policy or any subsequent endorsement whether liability is attributable to the Contractor or the City. The insurance provisions shall not be construed to li mit the Contractor’s indemnity obligations contained in the Contract. The City will not be liable for any accident, loss, or damage to the Work before completion, except as otherwise specified in Section 6-10.

The first sentence of Section 7-8.4.2 shall not be incorporated, and shall instead be replaced with the following:

Construction materials and equipment shall not be stored in Streets, roads, or highways unless otherwise specified in the Special Provisions or approved by the Engineer.

The first sentence of the second paragraph of Section 7-9 of the Standard Specifications shall not be incorporated, and shall instead be replaced with the following:

The Contractor shall relocate, repair, replace, or reestablish all existing improvements within the Project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, signal loops, fences, walls, sprinkler systems, signs, Utility installations, pavements, structures, etc.) which are damaged or removed as a result of the Contractor’s or the Subcontractors’ operations or as required by the Plans and Specifications.

The last paragraph of Subsection 7 -9 of the Standard Specifications shall not be incorporated, and shall instead be replaced with the following:

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or reestablishing existing improvements shall be included in the Bid.

Section 7 -12 of the Standard Specifications shall not be incorporated, and shall instead be replaced with the following:

The names, addresses and specialties of the Contractor, Subcontractors, architects or engineers may not be displayed on any signage within the public right-

12100-0001\2410807v5.doc City
of MB Form
GP-40

of-way. This signage prohibition includes advertising banners hung from truck beds or other equipment.

Otherwise, the provisions below shall supplement but not replace those provisions in Section 7 of the Standard Specifications.
7-1 THE CONTRACTOR’S EQUIPMENT AND FACILITIES
The use of excessively loud equipment and warning signals shall be avoided, except i n those cases required for the protection of personnel.
7-2 LABOR
7-2.2.1 Public Work
The Contractor acknowledges that the Project is a “public work” as defined in Labor Code Section 1720 et seq. (“Chapter 1”), and that this Project is subject to (a) Chapter 1, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the Director of Industrial Relations (“DIR”) implementing such statutes. The Contractor shall perform all Work on the Project as a public work. The Contractor shall comply with and be bound by all the terms, rules and regulations described in (a) and (b) as though set forth in full herein. 7-2.2.2 Copies of Wage Rates
Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Project are on file at City Hall and will be made available to any interested party on request. By initiating any Work on this Project, the Contractor acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and the Contractor shall post such rates at each job site covered by these Contract Documents.
7-2.2.3 Failure to Pay Prevailing Rates
The Contractor shall comply with and be b ound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty paid to the City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to these Contract Documents by the Contractor or by any Subcontractor. 7-2.2.4 Apprentices
The Contractor shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6 and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. The Contractor shall be responsible for compliance with these Sections for all apprenticeable occupations. Before commencing Work on this Project, the Contractor shall provide the City with a copy of the information submitted to any applicable apprenticeship program. Within 60 Days after concluding Work, Contractor and each of its Subcontractors shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Contract.

12100-0001\2410807v5.doc City
of MB Form
GP-41

7-2.2.5 Debarment or Suspension
The Contractor shall not perform Work with any Subcontractor that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. The Contractor and Subcontractors shall not be debarred or suspended throughout the duration of the Contract pursuant to Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. If the Contractor or any Subcontractor becomes debarred or suspended during the duration of the Project, the Contractor shall immediately notify the City. 7-2.3 Payroll Records
The Contractor shall comply with and be bound by the provisions of Labor Code Section 1776, which requires the Contractor and each Subcontractor to (1) keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776, (2) certify and make such payroll records available for insp ection as provided by Section 1776, and (3) inform the City of the location of the records. The Contractor has ten days in which to comply subsequent to receipt of a written notice requesting these records, or as a penalty to the City, the Contractor shall forfeit $100.00 for each Day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due.
7-2.4 Hours of Labor
The Contractor acknowledges that eight hours labor constitutes a legal day’s work. The Contractor shall comply with and be bound by Labor Code Section 1810. The Contractor shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty paid to the City, forfeit $25.00 for each worker employed in the performance of this Project by the Contractor or by any Subcontractor for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code Section 1815, work performed by employees of the Contractor in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.
7-2.5 Registration with the DIR
In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5. 7-2.6 Compliance Monitoring and Posting Job Sites
This Project is subject to compl iance monitoring and enforcement by the DIR. The Contractor shall post job site notices, as prescribed by regulation. 7-2.7 Subcontractors

12100-0001\2410807v5.doc City
of MB Form
GP-42

For every Subcontractor who will perform Work on the Project, the Contractor shall be responsible for such Subcontractor’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and the Contractor shall include in the written Contract between it and each Subcontractor a copy of the provisions in this Section 7 -2 of the General Provisions and a requirement that each Subcontractor shall comply with those provisions. The Contractor shall be required to take all actions necessary to enforce such contractual provisions and ensure Subcontractor’s compliance, including without limitation, conducting a periodic review of th e certified payroll records of the Subcontractor and upon becoming aware of the failure of the Subcontractor to pay its workers the specified prevailing rate of wages. The Contractor shall diligently take corrective action to halt or rectify any failure.
7-2.9 Prevailing Wage Indemnity
To the maximum extent permitted by law, the Contractor shall indemnify, hold harmless and defend (at the Contractor’s expense with counsel reasonably acceptable to the City) the City, its officials, officers, employees, agen ts and independent contractors serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed in Section 7-2 of the General Provisions by any Person (including the Contractor, its Subcontractors, and each of their officials, officers, employees and agents) in connection with any Work undertaken or in connection with the Contract Documents, including without li mitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of the Contractor under this Section 7-2.9 shall survive expiration or termination of the Contract. 7-3 INSURANCE
The Contractor shall at all times during the term of the Contract carry, maintain, and keep in full force and effect the insurance referenced in Section 7 -3 of the Standard Specifications, as modified below.
7-3.1.1 Acceptability of Insurers.

The insurance policies required under this Section 7 -3 shall be issued by an insurer authorized or admitted to write insurance in the State of California with a rating of A:VII or better in the latest edition of the A.M. Best Insurance Rating Guide. Self insurance shall not be considered to comply with the insurance requirements under this Section 7-3. 7-3.1.2 Additional Insured.

The City, its elected and appointed officials, officers, employees, attorneys, agents, designated volunteers, and independent contractors in the role of City officials, shall be the insured or named as additional insureds covering the Work, regardless of any inconsistent statement in the policy or any subsequent endorsement, whether liability is attributable to the Contractor or the City. The commercial general and automobile liability policies shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. This provision shall also apply to any excess/umbrella liability policies.
7-3.1.3 Primary and Non-Contributing.

The insurance policies required under this Section 7-3 shall apply on a primary non-contributing basis in relation to any other insurance or self -insurance available to the City. Any insurance or

12100-0001\2410807v5.doc City
of MB Form
GP-43

self-insurance maintained by the City, its officers, em ployees, agents or volunteers, shall be in excess of the Contractor’s insurance and shall not contribute with it. This provision shall also apply to any excess/umbrella liability policies.
7-3.1.4 Contractor’s Waiver of Subrogation.

The insurance policies require d under this Section 7 -3 shall not prohibit the Contractor and the Contractor’s employees, agents or Subcontractors from waiving the right of subrogation prior to a loss. The Contractor hereby waives all rights of subrogation against the City. 7-3.1.5 Deductibles and Self-Insured Retentions.

Any deductibles or self-insured retentions must be declared to and approved by the City. At the City’s option, the Contractor shall either reduce or eliminate the deductibles or self -insured retentions with respect to the City, or the Contractor shall procure a bond guaranteeing payment of losses and expenses.
7-3.1.6 Cancellations or Modifications to Coverage.

The Contractor shall not cancel, reduce or otherwise modify the insurance policies required by this Section 7-3 during the term of the Contract. The commercial general and automobile liability policies required under the Contract shall be endorsed to state that should the issuing insurer cancel the policy before the expiration date, the issuing insurer will endeavor to mail 30 days’ prior written notice to the City. If any insurance policy required under this Section 7 -3 is canceled or reduced in coverage or limits, the Contractor shall, within two business days of notice from the insurer, phone, fax or notify the City via certified mail, return receipt requested, of the cancellation of or changes to the policy
7-3.1.7 City Remedy for Noncompliance.

If the Contractor does not maintain the policies of insurance required under this Section 7-3 in full force and effect during the term of the Contract, or in the event any of the Contractor’s policies do not comply with the requirements under this Section 7 -3, the City may either immediately terminate the Contract or, if insurance is available at a reasonable cost, the City may, but has no duty to, take out the necessary insurance and pay, at the Contractor’s expense, the premium thereon. The Contractor shall promptly reimburse the City for any premium paid by the City or the City may withhold amounts sufficient to pay the premiums from pa yments due to the Contractor.
7-3.1.8 Evidence of Insurance.

At least two Working Days prior to the performance of Services under the Contract, the Contractor shall furnish the City’s Risk Manager with a certificate or certificates of insurance and all original endorsements (both of which must reference the same Policy number), evidencing and effecting the coverages required under Section 7 -3 of the Standard Specifications, as modified by this Section 7 -3. The endorsements are subject to approval by the City’s Ri sk Manager. The Contractor may provide complete, certified copies of all required insurance policies to the City.

The Contractor shall provide proof to the City’s Risk Manager that insurance policies expiring during the term of the Contract have been ren ewed or replaced with other policies providing at least the same coverage. The Contractor shall furnish such proof at least two weeks prior to the expiration of the coverages.

12100-0001\2410807v5.doc City
of MB Form
GP-44

The endorsements are to be signed by a person authorized by that insurer to bin d coverage on its behalf. The endorsements must specifically name the City of Manhattan Beach and its elected and appointed officials, officers, employees, attorneys, agents, designated volunteers, and independent contractors in the role of City officials as insureds or additional insureds. The Contractor shall maintain current insurance certificates and endorsements on file with the City’s Risk Manager at all times during the term of this Contract. The City reserves the right to require complete, certified copies of all required insurance policies at any time.

Where the Contractor has entered into an agreement with a Professional Employment Organization ( PEO) to provide human resources, workers' compensation insurance, or other benefits to the Contractor's employees, the Contractor must also submit the agreement with the PEO. If the evidence of insurance submitted by the Contractor pursuant to this Section 7 -3 evidences that the insurance is provided by the PEO, all such PEO-provided insurance coverages and indemnities must comply with the requirements of these Contract Documents. 7-3.1.9 Indemnity Requirements not Limiting.

Procurement of insurance by the Contractor shall not be construed as a limitation of Contractor’s liability or as full performance of the Contractor’s duty to indemnify the City under Section 7-4 of the Contract.
7-3.1.10 Subcontractor Insurance Requirements.

The Contractor shall require each of its Subcontractors that perform Services under the Contract to maintain insurance coverage that meets all of the requirements of this Section 7-3. 7-3.1.11 Replacement Insurance
The Contractor agrees that it will not cancel, reduce or otherwise modify the insurance coverage.

The Contractor agrees that if it does not keep the required insurance in full force and effect, and such insurance is available at a reasonable cost, the City may take out the necessary insurance and pay the premium thereon, and the repayment thereof shall be deemed an obligation of the Contractor and the cost of such insurance may be deducted, a t the option of the City, from payments due the Contractor. This shall be in addition to all other legal options available to the City to enforce the insurance requirements.
7-3.2 General Liability Insurance
Instead of the minimum limits listed in Section 7-3.2 of the Standard Specifications, the Contractor shall procure and at all times during the term of the Contract carry, maintain, and keep in full force and effect Commercial General Liability Insurance with a minimum limit of $2,000,000.00 per occurrence for bodily injury, personal injury and property damage and a general aggregate limit of $2,000,000.00 per project or location. If the Contractor is a limited liability company, the commercial general liability coverage shall be amended so that the Contractor and its managers, affiliates, employees, agents and other persons necessary or incidental to its operation are insureds.
7-3.3 Workers’ Compensation Insurance
Workers’ Compensation Insurance as required by the State of California and Employer’s Liability Insurance with a minimum limit of $1,000,000.00 per accident for bodily injury or disease. If the

12100-0001\2410807v5.doc City
of MB Form
GP-45

Contractor has no employees while performing the Work under t he Contract, a Workers’ Compensation policy is not required, but the Contractor shall execute a declaration that it has no employees.
7-3.4 Automobile Insurance
Instead of the minimum limits listed in Section 7-3.4 of the Standard Specifications, the Contractor shall procure and at all times during the term of the Contract carry, maintain, and keep in full force and effect Automobile Liability Insurance for any owned, non -owned or hired vehicle used in connection with the performance of the Contract with a combin ed single limit of $2,000,000.00 per accident for bodily injury and property damage. If the Contractor does not use any owned, non-owned or hired vehicles in the performance of the Work under this Contract, the Contractor shall obtain a non-owned auto endorsement to the Commercial General Liability policy required by Subsection 7-3.2.
7-3.5 Insurance Requirements not Limiting
If the Contractor maintains broader coverage and/or higher limits than the minimums required above, the City requires and shall be e ntitled to the broader coverage and/or the h igher limits maintained by the C ontractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 7-4 INDEMNIFICATION
The following indemnity provisions shall supersede the indemnity in Section 7-3.1 of the Standard Specifications.
7-4.1 Indemnities for Third Party Claims.

To the fullest extent permitted by law, the Contractor shall, at its sole cost and expense, defend, hold harmless and indemnif y the City and its elected officials, officers, attorneys, agents, employees, designated volunteers, successors, assigns and those City agents serving as independent contractors in the role of City officials (collectively “Indemnitees”), from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith and the payment of all consequential damages (collectively “Liabilities”), in law or equity, whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of the Con tractor, its officers, agents, servants, employees, Subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or individual that the Contractor shall bear the legal liability thereof) in the performance of the Contract, including the Indemnitees’ active or passive negligence, except for Liabilities arising from the sole negligence or willful misconduct of the Indemnitees, as determined by final arbitration or court decision or by the agreement of the Parties. The Contractor shall defend the Indemnitees in any action or actions filed in connection with any Liabilities with counsel of the Indemnitees’ choice, and shall pay all costs and expenses, including all attorneys’ fees and experts’ costs actually incurred in connection with such defense. The Contractor shall reimburse the Indemnitees for any and all legal expenses and costs incurred by Indemnitees in connection therewith.
7-4.1.1 Taxes and Workers’ Compensation

12100-0001\2410807v5.doc City
of MB Form
GP-46

The Contractor shall pay all required taxes on amounts paid to the Contractor under the Contract, and indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by the Contract. The Contractor shall fully comply with the Workers’ Compensation law regarding the Contractor and the Contractor’s employees. The Contractor shall indemnify and hold the City harmless from any failure of the Contractor to comply with applicable Worker s’ Compensation laws. The City may offset against the amount of any fees due to the Contractor under the Contract any amount due to the City from the Contractor as a result of the Contractor’s failure to promptly pay to the City any reimbursement or indemnification arising under this Subsection 7-4.1.1. 7-4.1.2 Subcontractor Indemnity Agreements
The Contractor shall obtain executed indemnity agreements with provisions identical to those in this Section 7-4 from each and every Subcontractor or any other person or entity involved by, for, with or on behalf of the Contractor in the performance of the Contract. If the Contractor fails to obtain such indemnity obligations, the Contractor shall be fully responsible and indemnify, hold harmless and defend the Indemnitees from and against any and all Liabilities at law or in equity, whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of the Contractor’s Subcontractor, its officers, agents, servants, employees, Subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or individual that the Contractor’s Subcontractor shall bear the legal liability thereof) in the performance of the Contrac t, including the Indemnitees’ active or passive negligence, except for Liabilities arising from the sole negligence or willful misconduct of the Indemnitees, as determined by final arbitration or court decision or by the agreement of the Parties.
7-4.2 Workers’ Compensation Acts not Limiting.

The Contractor’s indemnifications and obligations under this Section 7 -4, or any other provision of the Contract, shall not be limited by the provisions of any Workers’ Compensation act or similar act. The Contractor expressly waives its statutory immunity under such statutes or laws as to the City, its officers, agents, employees and volunteers.
7-4.3 Insurance Requirements not Limiting.

The City does not, and shall not, waive any rights that it may possess against the Contractor because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to the Contract. The indemnities in this Section 7 -4 shall apply regardless of whether or not any insurance policies are determi ned to be applicable to the Liabilities, tax, assessment, penalty or interest asserted against the City. 7-4.4 Survival of Terms.

The Contractor’s indemnifications and obligations under this Section 7 -4 shall survive the expiration or termination of the Contract.
7-4.5 Civil Code Exception.

Nothing in this Section 7 -4 shall be construed to encompass Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Contract is subject to Civil Code Section 2782(a) or the City’s active negligence to the limited extent that the underlying Contract

12100-0001\2410807v5.doc City
of MB Form
GP-47

Documents are subject to Civil Code Section 2782(b), provided such sole negligence, willful misconduct or active negligence is dete rmined by agreement between the parties or by the findings of a court of competent jurisdiction.
7-4.6 Nonwaiver of Rights.

Indemnitees do not and shall not waive any rights that they may possess against the Contractor because the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to these Contract Documents. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. 7-4.7 Waiver of Right of Subrogation.

The Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all Claims arising out of or incident to the activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent or subsequent active or passive negligence by Indemnitees.
7-5 PERMITS
Before starting any construction work, the Contractor will be required to obtain all necessary permits from the City, which may include obtaining a no fee right -of-way permit for Work within the public right-of-way, as well as all other permits required from all other agencies. Should this Project require construction of trenches or excavations which are five feet or deeper and into which a person is required to descend, the Contractor shall obtain a Cal/OSHA permit and furnish the City with a copy before Work can commence on this Project. The Contractor shall bear all cost for fees for all agencies except for the City’s permit fees.

The Contractor shall procure all permits and licenses (including a City of Manhattan Beach business license), pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work. All City of Manhattan Beach permits required for the performance of the Contract shall be issued on a “no fee” basis. Permi ts required by other agencies shall be obtained by the Contractor for all work within the City of Manhattan Beach. 7-7 COOPERATION AND COLLATERAL WORK
The Contractor shall be responsible for coordinating all Work with the City’s street sweeping, trash pick-up, and street maintenance contractors, emergency services departments, utility companies’ crews, and others when necessary. Payment for conforming to these requirements shall be included in other items of Work, and no additional payment shall be made thereof. 7-8 WORKSITE MAINTENANCE
Clean-up shall be done as Work progresses at the end of each day and thoroughly before weekends. The Contractor shall not allow the Work site to become littered with trash and waste material, but shall maintain the same in a neat and orderly condition throughout the construction operation. Materials which need to be disposed shall not be stored at the Project site, but shall be removed by the end of each Working Day. If the job site is not cleaned to the satisfaction of

12100-0001\2410807v5.doc City
of MB Form
GP-48

the Engineer, the cleaning will be done or contracted by the City and shall be back-charged to the Contractor and deducted from the Contract Price.

The Contractor shall make arrangements for storing its equipment and materials. The Contractor shall make its own arrangements for any necessary off-site storage or shop areas necessary for the proper execution of the Work. Approved areas within Work site may be used for temporary storage; however, the Contractor shall be responsible for obtaining any necessary permits from the City. In any case, the Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way or on any section where traffic is restricted at any time.

The Contractor shall deliver, handle, and store p roducts in accordance with the manufacturer’s written recommendations and by methods and means that will prevent damage, deterioration, and loss including theft. Delivery schedules shall be controlled to minimize long-term storage of products at the Project site and overcrowding of construction spaces. In particular, the Contractor shall provide delivery and installation coordination to ensure minimum holding or storage times for products recognized to be flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other sources of loss.

Storage shall be arranged to provide access for inspection. The Contractor shall periodically inspect to ensure products are undamaged and are maintained under required conditions.

The Contractor shall promptly remove from the vicinity of the completed Work, all rubbish, debris, unused materials, concrete forms, construction equipment, and temporary structures and facilities used during construction. Final Acceptance of the Work by the City will be with held until the Contractor has satisfactorily complied with the foregoing requirements for final clean -up of the Project site.

All costs associated with the clean-up and storage required to complete the Project shall be the sole responsibility of the Contractor.

Pursuant to the provisions of Section 7 -8 and Section 7 -10 of the Standard Specifications and these General Provisions, the Contractor is responsible for Project site maintenance and for public convenience and safety. Payment for compliance with these provisions is considered as included in the prices bid for other contract items.

The City, however, to maintain good public relations, may deem it necessary to require special Project site maintenance and public convenience and safety actions and work t o be performed by the Contractor that are over and above those required by the provisions of Section 7 -8 and Section 7-10 of the Standard Specifications and these General Provisions.

These actions and work shall be as directed by the Engineer in writing an d payment for compliance therewith shall be on a cost plus basis for extra work per Section 3-3 of the Standard Specifications and applied against the not -to-exceed bid item for “Special Project Site Maintenance and Public Convenience and Safety.”
7-10 SAFETY
The provisions below shall supplement but not replace those provisions in Subsection 7-10 of the Standard Specifications.

12100-0001\2410807v5.doc City
of MB Form
GP-49

7-10.2 Haul Routes
Subsection 7-10.3 of the Standard Specifications shall be deleted and replaced as follows:

The Contractor must obtain the Engineer’s approval before using any haul routes.

Further detail requirements for haul traffic are delineated in the Special Provisions. 7-10.5.3 Steel Plate Covers
The Contractor shall cover all openings, trenches and excavations at the end of each Work Day with steel plate covers.
7-15 RECYCLING OF MATERIALS
Subsection 7-15 is hereby added to the Standard Specifications as follows:
7-15.1 Recycling of Asphalt Concrete, Portland Cement Concrete, Aggregate Base, and Green Waste are Required
The records of disposal, including s cale tonnages, shall be furnished to the City on a monthly basis. Failure to comply with the requirements of this Section will result in delay of progress payment.
7-15.2 Contractor’s Obligation
The City is committed to a recycling program. If available, it is the obligation of the Contractor, under the Contract, to recycle the waste material through an approved recycling plant.

Records and reports of waste recycle will be submitted to the City on a regular monthly basis.

SECTION 8. FACILITIES FOR AGENCY PERSONNEL
The provisions of Section 8 of the Standard Specifications shall apply except as modified herein.

No field offices for City personnel shall be required; however, City personnel shall have the right to enter upon the Project at all times and shall be admitted to the offices of the Contractor to use the telephone, desk and sanitary facilities provided by the Contractor for its own personnel.

SECTION 9. MEASUREMENT AND PAYMENT
The provisions below shall supplement but not replace those provisions in Section 9 of the Standard Specifications.
9-1.1 General
Add the following at the end of Subsection 9-1.1:

All items of Work which are not designated on the Bid Schedule by the letters “F” or “LS” or words “Final” or “Lump Sum” shall have final pay quantiti es measured and paid for in accordance with the Standard Specifications and these General Provisions.

12100-0001\2410807v5.doc City
of MB Form
GP-50

9-1.2 Methods of Measurement
The Contract Price shall constitute full compensation for all labor, equipment, materials, tools and incidentals required to complete the Project as outlined in these Contract Documents and as directed by the Engineer.
9-2 LUMP SUM WORK
Delete the first sentence of Subsection 9-2 and substitute the following:

Items of Work which are designated by the letters “LS” or the words “L ump Sum” in the Unit column of the Bid Schedule shall be paid for at the price indicated in the Bid, unless the dimensions of the Work, as shown on the Plans, are revised by the Engineer. If such dimensions are revised and such revisions result in an increase or decrease in the quantity of such Work, the final payment for the lump sum item will be revised in proportion to the change in dimensions authorized by Change Order.

Add the following at the end of Subsection 9-2:

The Contractor shall submit a Work item breakdown (Schedule of Values) of the Bid, described in the second paragraph of Subsection 9 -2, “Lump Sum Work,” of the Standard Specifications, within ten Working Days after award of the Contract and/or at any other time as required by the Engineer.

No guarantee is made regarding the amount of Work required to complete a lump sum item of Work.
9-2.1 Progress Payments for Lump Sum Items of Work
The letter “C” or the word “Complete” in the Code column of the Bid Schedule for a lump sum item of Work shall mean that payment for that item will only be made after all Work for that item has been completed. The “%” symbol in the Code column of the Bid Schedule for a lump sum item of Work shall mean that progress payments for that item will be allowed based on the percentage of completion as determined by the Engineer in each pay period, typically every 30 days. (See Subsection 9-3.2 of the Standard Specifications and these General Provisions.) 9-3 PAYMENT
9-3.1 General
In accordance with Public Contract Code Section 7107, if no claims have been filed and are still pending, the amount deducted from the final estimate and retained by the City will be paid to the Contractor except such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be withheld for any other lawful purposes.

Whenever the Contractor is required to perform work or furnish equipment, labor, tools, and materials of any class for which no price is fixed in the proposal, it shall be understood that such work, equipment, labor, tools, and materials shall be provided without extra charge, allowance, or direct payment of any kind. The cost of performing such work or furnishing such equipment, labor, tools, and materials shall be included in the unit bid prices in the proposal most closely related to the work and no additional compensation will be made thereof.

12100-0001\2410807v5.doc City
of MB Form
GP-51

If any portion of the work done or materials furnished under the Contract shall prove defective or not in accordance with the Specifications and Contract drawings, and if the imperfection in the same is not of sufficient magnitude or importance to make the work dangerous or undesirable, the Engineer shall have the right and authority to retain the work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefor in the payment due the Contractor as may be just and reasonable.

Delete the tenth paragraph of Subsection 9-3.1 and substitute the following:

Not later than 60 days from the date of Final Acceptance, the five percent deducted and retained from each progress estimate (see Subsection 9 -3.2 of the Standard Specifications and these General Provisions) by the City will be paid to the Contractor except such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be authorized by the Contract to be further retained.
9-3.2 Partial and Final Payment
9-3.2.1 Monthly Closure Date and Invoice Date
The Contractor shall prepare and submit the form attached herewith (see Appendices I and II), or its own form in an identical format, to the Engineer for all requests for progress payments for the work performed in accordance with the provisions of the Contract during the pr eceding month.

The progress payment request shall be submitted monthly, and a maximum of one progress payment request may be submitted each month. The Contractor shall submit a Conditional Waiver and Release form (Civil Code Section 8132) with the appli cable monthly progress payment request. Progress payment requests associated with work completed prior to June 30th (the end of the City’s fiscal year), must be submitted no later than July 30th. 9-3.2.2 Payments
The City shall make payments within 30 Days after receipt of the Contractor’s undisputed and properly submitted payment request, including an updated construction schedule pursuant to Section 6-1.1 of the General Provisions. The City shall return to the Contractor any payment request determined not to be a proper payment request as soon as practicable, but not later than seven Days after receipt, and shall explain in writing the reasons why the payment request is not proper. Acceptance by the Contractor of the payment made in accordance with the final estimate shall be a release to the City, its officers, agents, and employees excepting only claims against the City for any amount withheld by it at the time of such payment. 9-3.2.3 Retention
The City shall withhold not less than five percent from each progress pay ment. The City shall withhold not less than five percent of the Contract Price from the Final Payment Amount (defined in Section 9 -3.2.4) until at least 35 days after recordation of the Notice of Completion, or recordation of a notice of cessation , but not longer than the period permitted by Public Contract Code Section 7107.

In addition to retained percentage and liquidated damages, the City may withhold payments to the Contractor including for defective work not remedied and other valid claims against the Contractor.

12100-0001\2410807v5.doc City
of MB Form
GP-52

9-3.2.4 Final Invoice and Payment
Whenever the Contractor shall have completely performed the Contract in the opinion of the Engineer, the Contractor shall submit to the Engineer a written statement of the final quantities of Contract items in the form of the final invoice, which must have an identical format to the progress payment request form attached herewith (see Appendix I) . Upon receipt of the final payment request, the Engineer shall check the quantities included therein and shall authorize a payment amount, which in the Engineer’s opinion shall be just and fair, covering the value of the total amount of Work done by the Contractor, less all previous payments and all amounts to be retained under the provisions of the Contract Documents (“Final Payment Amount”). The Contractor shall submit a Conditional Waiver and Release form (Civil Code Section 8136) with the Final Payment request. The Engineer shall then request that the City accept the Work and that the City Clerk be authorized to file, on behalf of the City in the office of the County Recorder, a Notice of Completion of the Work herein agreed to be done by the Contractor. In addition, the final payment will not be released until the Contractor returns the control set of Plans and Speci fications showing the redlined as-built conditions.

Final payment requests associated with work completed prior to June 30th (the end of the City’s fiscal year), must be submitted no later than July 30th. 9-3.2.5 Substitute Security
In accordance with Public Contr act Code Section 22300, the Contractor may request that it be permitted to substitute securities in lieu of having retention withheld by the City from progress payments when such payments become due or, in the alternative, the Contractor may request that the City make payments of earned retentions directly to an agreed upon designated escrow agent at the Contractor’s expense. If the Contractor selects either one of these alternatives, the following shall control.
9-3.2.5.1 Substitution of Securities for Performance Retention At some reasonable time before any progress payment would otherwise be due and payable to the Contractor in the performance of Work under these Contract Documents, the Contractor may submit a request to the City in writing to permit the substitut ion of retentions with securities equivalent to the amount estimated by the City (“estimated amount of retention”) to be withheld.

The Contractor shall deposit such securities with the City or may, in the alternative, deposit such securities in escrow with a State or federally chartered bank in California, as the escrow agent, at the Contractor’s expense. Such securities will be the equivalent or greater in value of the estimated amount of retention. If the Contract is modified by written Modifications o r Change Orders or the Contractor otherwise becomes entitled to receive an amount more than the Contract Price at the time the securities are deposited, the Contractor shall, at the request of the City, deposit with the City or escrow agent, whichever is a pplicable, additional securities within a reasonable time so that the amount of securities on deposit with the City or escrow agent is equivalent or greater in value than the amount of retention the City would otherwise be entitled to withhold from progress payments due or to become due to the Contractor as the Work progresses.

The City shall withhold any retention amount that exceeds the security amount until the additional securities are deposited and, if the deposit is with an escrow agent, the City has confirmation from that escrow agent of the new total value of securities. Upon satisfactory completion of the Contract, which shall mean, among other things, that the City is not otherwise entitled to retain proceeds from progress payments as elsewhere provided in the Contract or under applicable law, the securities shall be returned to the Contractor. The City shall, within its sole discretion,

12100-0001\2410807v5.doc City
of MB Form
GP-53

determine whether the amount of the securities on deposit with the City or escrow agent is equal to or greater than the amount of estimated retention of progress payments that could otherwise be held by the City if the Contractor had not elected to substitute same with securities. 9-3.2.5.2 Deposit of Retention Proceeds with an Escrow Agent As an alternative to the substitu tion of securities, as provided above, or the City otherwise retaining and holding retention proceeds from progress payments, the Contractor may request the City to make payments of retentions earned directly to an escrow agent with the same qualifications as required in Section 9-3.2.5.1 above and at the expense of the Contractor. At its sole expense, the Contractor may direct the investment of such retention payments into only such securities as mentioned in Section 9-3.2.5.3 below and shall be entitled to interest earned on such investments on the same terms provided for securities deposited by the Contractor. Upon satisfactory completion of the Contract, which shall mean when the City would not otherwise be entitled to withhold retention proceeds from progress payments had the Contractor not elected to have such proceeds deposited into escrow, the Contractor shall be allowed to receive from the escrow agent all securities, interest and payments deposited into escrow pursuant to the terms of this Section. The Contractor shall pay to each Subcontractor, not later than ten Days of receipt of payment, the respective amount of interest earned, net of costs attributed to retention withheld from each Subcontractor, on the amount withheld to ensure performance of the Contractor. 9-3.2.5.3 Subcontractor Entitlement to Interest
If the Contractor elects to receive interest on any moneys withheld in retention by the City, then the Subcontractor shall receive the identical rate of interest received by the Contractor on any retention moneys withheld from the Subcontractor by the Contractor, less any actual pro rata costs associated with administering and calculating that interest. In the event that the interest rate is a fluctuating rate, the rate for the Subcontractor shall be determined by calculating the interest rate paid during the time that retentions were withheld from the Subcontractor. If the Contractor elects to substitute securities in lieu of retention, then, by mutual consent of the Contractor and the Subcontractor , the Subcontractor may substitute securities in exchange for the release of moneys held in retention by the Contractor. The Contractor shall pay each Subcontractor, not later than ten Days after receipt of escrow moneys, the amount owed to each Subcontractor from the moneys plus the respective amount of interest earned, net of costs attributed to the retention held from each Subcontractor, on the amount of retention withheld to ensure performance of the Subcontractor.
9-3.2.5.4 Securities Eligible for Investment
Securities eligible for investment shall include those listed in Government Code Section 16430, bank or savings and loan certificates of deposit, interest -bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed upon between the Contractor and the City. The Contractor shall be the beneficial owner of any securities substituted for any monies withheld and shall receive any interest thereon.
9-3.2.5.5 Escrow Agreement for Security Deposits in Lieu of Retention The escrow agreem ent that shall be used for the deposit of securities in lieu of retention shall substantially conform to the form prescribed in Public Contract Code Section 22300(f).

12100-0001\2410807v5.doc City
of MB Form
GP-54

9-3.2.5.6 Inconsistencies with Prevailing Statutory Requirements If there is any inconsistency between or differences in Public Contract Code Section 22300 and the terms of this provision, or any future amendments thereto, Section 22300 shall control. 9-4 AUDIT
The City or its representative shall have the option of inspecting and/or auditing all records an d other written materials used by the Contractor in preparing its billings to the City as a condition precedent to any payment to the Contractor or in response to a construction claim or a Public Records Act (Government Code Section 6250 et seq.) request. The Contractor will promptly furnish documents requested by the City at no cost. Additionally, the Contractor shall be subject to State Auditor examination and audit at the request of the City or as part of any audit of the City, for a period of three and one-half years after Final Acceptance under the Contract. The Contractor shall include a copy of this Section 9-4 in all contracts with its Subcontractors, and the Contractor shall be responsible for immediately obtaining those records or other written material from its Subcontractors upon a request by the State Auditor or the City. If the Project includes other auditing requirements, those additional requirements will be listed in the Special Provisions.

SECTION 10. CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLAN

10.1 GENERAL
To ensure that solid waste generated in the City is reduced, reused or recycled, the Contractor shall submit a “Waste Management Plan” (WMP) to the Engineer for review and approval, using the form found at the end of this Section 10. After the WMP has been reviewed by the Engineer, it will be returned to the Contractor in one of the following four status conditions:
 “Approved”
 “Further Explanation Required”: The Engineer will return the WMP to the Contractor with questions about the WMP. The Contractor shall resubmit plan with each of the City’s questions answered thoroughly.
 “Denied”: The Engineer will indicate the reasons for denial. The Contractor shall then re- submit a new WMP that complies with the requirements of this Se ction or request an Infeasibility Exemption.
 “Infeasibility Exemption Approved”
The Contractor shall follow the WMP and document results during demolition and construction.

Final documentation shall be submitted at the end of the project to the Engineer fo r review of compliance with the original WMP. The amount deducted from the final estimate and retained by the City in accordance with Section 9.3.1 and 9.3.2 shall be withheld until final WMP is submitted to the City and approved by the City.
10-2 DEFINITIONS
a) “Construction” means the building of any facility or structure or any portion thereof including any tenant improvements to an existing facility or structure.

12100-0001\2410807v5.doc City
of MB Form
GP-55

b) “Construction and Demolition Debris” means used or discarded materials removed from premises during construction of the Project.
c) “Conversion Rate” means the rate set forth in the standardized Conversion Rate Table approved by the City Council pursuant to this Section for use in estimating the volume or weight of materials identified in a Construction and Demolition Waste Reduction and Recycling Plan. d) “Divert” means to use material for any purpose other than disposal in a landfill. Diversion credit is given for source reduction (waste reduction), recycling, and composting. e) “Diversion Requirement” means the diversion of at least 65% of the total Construction and Demolition Debris generated by a Project via reduction (source reduction), reuse or recycling, unless the Contractor has been granted an Infeasibility Exemption, in which case the Diversion Requirement shall be the maximum feasible diversion rate established by the Engineer. f) “Recycling” means the process of collecting, sorting, cleansing, treating, and reconstituting materials that would otherwise become solid waste, and retu rning them to the economic mainstream in the form of raw material for new, reused, or reconstituted products which meet the quality standards necessary to be used in the marketplace. g) “Renovation” means any change, addition, or modification in an existing structure. h) “Reuse” means further or repeated use of Construction or Demolition Debris. An example is the reuse of crushed concrete as road base or as aggregate on the construction site. i) “Salvage” means the controlled removal of Construction or Demolition Debris from project for the purpose of recycling, reuse, or storage for later recycling or reuse. j) “Construction and Demolition Waste Management Plan” means a completed form, approved by the Engineer for the purpose of compliance with this Sec tion, submitted by the Contractor/Contractor for any Covered or Noncovered Project that indicates the estimated diversion that the Contractor/Contractor anticipates in diverting from disposal. k) “Construction and Demolition Waste Management Report” means a completed form, approved by the Engineer for the purpose of compliance with this Section, submitted by the Contractor for any Project that documents the disposal and diversion tonnages and destinations. 10-3 INFEASIBILITY EXEMPTION
a) Application. If th e Contractor experiences unique circumstances that the Contractor believes make it infeasible to comply with the Diversion Requirement, the Contractor shall apply for an exemption at the time that it submits the WMP. The Contractor shall indicate on the WMP the maximum rate of diversion the Contractor believes is feasible for each material and the specific circumstances that the Contractor believes make it infeasible to comply with the Diversion Requirement.
b) The Engineer shall review the information supplied by the Contractor and may meet with the Contractor to discuss possible ways of meeting the Diversion Requirement. Based on the information supplied by the Contractor, the Engineer shall determine whether it is possible for the Contractor to meet the Diversion Requirement.

12100-0001\2410807v5.doc City
of MB Form
GP-56

c) If the Engineer determines that it is infeasible for the Contractor to meet the Diversion Requirement due to unique circumstances, the Engineer shall determine the maximum feasible diversion rate for each material and shall indic ate this rate on the WMP submitted by the Contractor. The Engineer shall return a copy of the WMP to the Contractor marked “Infeasibility Exemption Approved.”
d) Denial of Exemption. If the Engineer determines that it is possible for the Contractor to meet the Diversion Requirement, the Engineer shall so inform the Contractor in writing. The Contractor will have 15 days to resubmit a new WMP. If the Contractor fails to resubmit a new WMP, or if the resubmitted WMP does not comply with the requirements of the plan, the Engineer shall deny the WMP.
10-4 DIVERSION PROGRAM
The methodology used to calculate diversion is based on the Title 14, California Code of Regulations, Article 6.1 Solid Waste Generation Study, Section 18722 et seq, and is consistent with California Integrated Waste Management Board measurement protocols. The following equation defines the “Generation-Based Diversion Quantification Methodology”:

Generation = Disposal + Diversion
Diversion Rate (%) = Diversion Tons
Generation Tons
10-5 ADDITIONAL INFORMATION
Other materials to assist the Contractor in completing the WMP can be found on the City’s website at www.citymb.info.
 Construction and Demolition Debris Recycling Guide
 Construction and Demolition Recycling Brochure
The California Integrated Waste Management Board has also developed Technical Assistance Literature regarding construction and demolition waste reduction and recycling, which is available on-line at http://www.ciwmb.ca.gov/ConDemo/.

12100-0001\2410807v5.doc City
of MB Form
GP-57

CITY OF MANHATTAN BEACH
Construction & Demolition Waste Management Plan
Manhattan Beach Municipal Code 5.26 requires construction projects to reuse or recycle 65% of all construction site waste (All Demo & Roof tear -off projects, and All construction with a total value of $100 ,000+). All haulers and contractors MUST have a business license in the City of Manhattan Beach.

REQUIRED GOAL: REUSE OR RECYCLE A MINIMUM OF 65% OF ALL PROJECT WASTE Instructions:

1. Complete entire WMP & submit to the Project Manager as a project submittal.

2. Reuse and/or recycle at least 65% of all construction site waste and keep good records of all facility waste tickets.

3. Submit a copy of this WMP and ALL recycling and landfill facility weight tickets before Final Inspection to the Project Manager as a new project submittal. A COPY OF THIS WMP AND RECEIPTS OF ALL RECYCLING AND DISPOSAL SHALL BE SUBMITTED BEFORE FINAL PAYMENT WILL BE MADE BY THE CITY.

Fines for Non-Compliance (MBMC 5.26.020): Demo projects up to $5,000 and Construction projects up to $10,000 Project Name: ______________________________________________________________________ Project Address: ______________________________________________________________________ Type of Project: [ ] Street Improvement [ ] Water Main [ ] Sewer Main [ ] Storm Drain [ ] Other
Total Bid Price: $_____________________________________________________________________ Requesting Infeasibility Exemption: [ ] Yes [ ] No Contractor Name: ________________________ Contact Name: _______________________ Address: ______________________________ Contact Phone: _______________________ Recycler: ______________________________ Recycler Contact: _______________________ Recycler Address: ________________________ Recycler Contact Phone: _________________

CITY USE ONLY
Application (Date) Final (Date)
Approved
Further explanation needed (see attached)
Denied
Infeasibility Exemption Approved
Reviewed By

Submit this form and the attached Waste Management Plan Table to: Engineering Division City of Manhattan Beach
3621 Bell Avenue
Manhattan Beach, CA 90266

12100-0001\2410807v5.doc City
of MB Form
GP-58

CITY OF MANHATTAN BEACH
Construction & Demolition Waste Management Plan Table
Project Name: _________________________________________________________ Total Estimated Waste Generated by Project: ________________ (IN TONS). (Ask your hauler, recycler or site cleanup vendor to assist you. Use receipts from your previous jobs for estimates.) Complete and return with Building Permit Application Complete and return with receipts prior to final building approval
Material Type Estimated
Reused/
Recycled
Estimated
Disposed/
Landfilled
Vendor or Facility
to be Used
(Destination)
Actual
Reused/
Recycled
Actual
Disposed/
Landfilled
Vendor or Facility
Used (Destination)
Asphalt & Concrete
Bricks/Masonry/Tiles
Building Materials (doors,
windows, fixtures, etc.)

Cardboard
Concrete Pavement and
Grindings

Drywall (new, unpainted)
Asphalt Pavement
Grindings

Landscape Debris (Plant &
Tree Trimmings)

Scrap Metal
Unpainted Wood & Pallets
Other (painted wood &
drywall, roofing, etc.)

Mixed C&D*
Trash/Garbage
TOTAL
*Mixed C&D is defined as a mixture of three or more materials (e.g., wood, drywall, roofing, etc.) from construction or demolition sites that will be taken to a “qualified” facility for recycling. (See C&D Debris Recycling Guide.) If you are requesting an infeasibi lity exemption and the estimated amount reused/recycled is less than 65%, please explain why (attach additional sheets if necessary):
________________________________________________________________________________________ If the actual amount reused/recycled is less than 65%, please explain why:
________________________________________________________________________________________ Prepared by (please print): _______________________________ Date: ________________________ Contractor Signature: ___________________________________ Phone Number: ________________

12100-0001\2410807v5.doc City
of MB Form
GP-59

Conversion Rates
The following conversion rates are estimates. The ranges vary widely, depending on how the materials are handled (compacted, loose, chipped, etc.). Use the conversion factors and receipts from any previous projects to help you estimate the potential amount of materials and diversion. Take into consideration the type and load of vehicles that will be used to haul the materials. Ask your hauler or recycler to assist you in estimating these numbers.

Material Lbs/cy Tons/cy
Asphalt 1,400 lbs/cy 0.7 tons/cy
Brick 2,430 lbs/cy 1.21 tons/cy
Cardboard 100 lbs/cy 0.05 tons/cy
Concrete 2,600 lbs/cy
(Sources range from1,000 to 4,000) 1.3 tons/cy
Dirt/Soils 2,660 lbs/cy 1.33 tons/cy
Drywall 700 lbs/cy 0.35 tons/cy
Wood (chipped) 300 – 650 lbs/cy 0.15 – 0.3 tons/cy
Mixed C&D Debris 900 lbs/cy 0.45 tons/cy
Mixed Waste/Trash 100 – 350 lbs/cy 0.5 – 0.175 tons/cy

12100-0001\2410807v5.doc City
of MB Form
GP-60

SECTION 11. ADDITIONAL TERMS
11-1 NONDISCRIMINATORY EMPLOYMENT
The Contractor shall not unlawfully discriminate against any individual based on race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation or military and veteran status. The Contractor understands and agrees that it is bound by and will comply with the nondiscrimination mandates of all statutes and local ordinan ces and regulations.
11-2 NOTICE TO PROCEED
Upon award of the Contract and signing the Contract Documents, the City shall issue the Contractor a Notice to Proceed , as specified in Section 4 of the Contract . The City will not authorize any Work to be done under these Contract Documents before the Contract has been fully executed. Any Work that is done by the Contractor in advance of the Notice to Proceed to Fulfill Preconstruc tion Requirements and Order Materials, or the Notice to Proceed with Construction (whichever is applicable), shall be considered as being done at the Contractor’s own risk and responsibility, and as a consequence will be subject to rejection. 11-3 CONTRACTOR’S RESPONSIBILITY FOR WORK
Until the final acceptance of the Work by the City a s defined in Section 6 -8.2 of the General Provisions, by written action of the Engineer, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part of the Work by the action of the elements, criminal acts, or any other cause. The Contractor shall rebuild, repair, restore and make good all injuries or damages to any portion of the Work occasioned by any cause before its completion and acceptance and shall bear the expense thereof, except for such injuries o r damages arising from the sole negligence or willful misconduct of the City, its officers, agents or employees. In the case of suspension of Work from any cause whatever, the Contractor shall be responsible for all materials and the protection of Work al ready completed, shall properly store and protect them if necessary, and shall provide suitable drainage and erect temporary structures where necessary.
11-4 PROCEDURE IN CASE OF DAMAGE TO PUBLIC PROPERTY
Any portions of curb, gutter, sidewalk or any other City improvement damaged by the Contractor during the course of construction shall be replaced by the Contractor at its own cost. The cost of additional replacement of curb, gutter or sidewalk in excess of the estimated quantities shown in the Bid form and Specifications, and found necessary during the process of construction (but not due to damage resulting from carelessness on the part of the Contractor during its operation), shall be paid to the Contractor at the unit prices submitted in its Bid. 11-5 REMOVAL OF INTERFERING OBSTRUCTIONS
The Contractor shall remove and dispose of all debris, abandoned structures, tree roots and obstructions of any character encountered during the process of excavation. It is understood that the cost of any such removals are made a part of the unit price bid by the Contractor under the item for excavation or removal of existing Work.

12100-0001\2410807v5.doc City
of MB Form
GP-61

11-6 SOILS ENGINEERING AND TESTING
An independent certified materials testing firm must be retained by the Contractor to perform materials t ests and applicable special inspections during the Contractor’s entire operation to ascertain compliance with the Contract requirements. If the initial tests do not meet the Contract requirements, the Contractor shall bear the cost of all subsequent tests.

The Contractor shall provide a copy of the testing and inspection reports to the Engineer within 24 hours upon receipt.

If the City requires other tests or more specific requirements for testing regarding this Project, those details will be included in the Special Provisions. 11-7 ACCESS TO PRIVATE PROPERTY
Unless otherwise stated in the Special Provisions, the Contractor shall be responsible for all fees and costs associated with securing permission to access private property for any portion of the Project.
11-8 WORKING DAYS AND HOURS
The Contractor shall do all Work between the hours of 7:30 a.m. to 4:30 p.m., Monday through Friday. No Work will be allowed on Saturday, Sunday or City holidays listed on the City’s website unless specifically mentioned in the Contract Documents or authorized by the City Engineer.

A permit may have other hours or Days for the Contractor to do the Work, and those hours and Days shall supersede any hours and Days written in this Section.

Whenever the Contractor is permit ted or directed to perform night Work or to vary the period during which Work is performed during the Working Day, the Contractor shall give 24 hours’ notice to the Engineer so that inspection may be provided. Also, a charge may be made to the Contractor for approved overtime or weekend inspections requested by the Contractor.

In the event that the Contractor exceeds the hours of work requirement without prior approval from the City Engineer, the City Engineer will issue a verbal warning. A second violation will result in a written warning. Thereafter, any subsequent exceedance of authorized work hours will result in the Contractor being assessed liquidated damages in the amount of $200.00 per occurrence, which will be deducted from the Contract amount.
11-9 CLAIM DISPUTE RESOLUTION
In the event of any dispute or controversy with the City over any matter whatsoever, the Contractor shall not cause any delay or cessation in or of Work, but shall proceed with the performance of the Work in dispute. The Con tractor shall retain any and all rights provided that pertain to the resolution of disputes and protests between the parties. The Disputed Work will be categorized as an “unresolved dispute” and payment, if any, shall be as later determined by mutual agreement or a court of law. The Contractor shall keep accurate, detailed records of all Disputed Work, claims and other disputed matters.

All claims arising out of or related to the Contract Documents or the Project, and the consideration and payment of such claims, are subject to the Government Claims Act (Government Code

12100-0001\2410807v5.doc City
of MB Form
GP-62

Section 810 et seq.) with regard to filing claims. All such claims are also subject to Public Contract Code Section 9204 and Public Contract Code Section 20104 et seq. (Article 1.5), where applicable. The Contract hereby incorporates those provisions as though fully set forth herein.

Thus, the Contractor or any Subcontractor must file a claim in accordance with the Government Claims Act as a prerequisite to filing a construction claim in compliance with Section 9204 and Article 1.5 (if applicable), and must then adhere to Article 1.5 and Section 9204, as applicable, pursuant to the definition of “claim” as individually defined therein. 11-10 THIRD PARTY CLAIMS
The City shall have full authority to compromise or otherwise settle any claim relating to the Project at any time. The City shall timely notify the Contractor of t he receipt of any third -party claim relating to the Project. The City shall be entitled to recover its reasonable costs incurred in providing this notice.
11-11 COMPLIANCE WITH LAWS
The Contractor shall comply with all applicable federal, State and local laws, ordinances, codes and regulations in force at the time the Contractor performs pursuant to the Contract Documents. 11-12 REQUIREMENT TO MITIGATE THE SPREAD OF COVID -19. The Contractor and all subcontractors for the Work shall comply with all applicable Federal, State, Los Angeles County, and City of Manhattan Beach statutes, regulations, orders, and ordinances regarding COVID-19 Infection Prevention. This requirement specifically includes, without limitation, compliance with (i) the “Safety and Health Guidance COVID -19 Infection Prevention in Construction” issued by the California Department of Industrial Relations, Division of Occupational Safety and Health and Safety on October 27, 2020 and as may be amended from time to time by the Department, (ii) the Reopening Safer at Work and in the Community for Control of COVID -19 Revised Order issued by the Los Angeles County Health Officer on Jnaury 29, 2021, as may be amended from time to time, and (iii) City of Manhattan Beach Director of Emergency Services Order No. 1, issued April 3, 2020, as may be amended from time to time.

Prior to the pre -construction meeting, the Contractor shall submit to the City a “COVID -19 Mitigation Program” implementing these requirements and shall post the COVID-19 Mitigation Program on the project site in a manner designated by the City’s Project Manager. The failure of employees or workers of the Contractor and all subcontractors on the Work to comply with these requirements shall be a default per Section 6-4.1, and may also result in a suspension of the Work pursuant to Section 6-3. Contractor acknowledges that, in the event that the Engineer suspends the Work as a result of such failure by Contractor or one of its subcontractors to comply with these requirements, City is not res ponsible for the de lay, and that pursuant to Section 6 -6.3 the Contractor is not entitled to compensation. The Contractor shall also pay to the City the costs and expenses incurred by the City resulting from the failure of employ ees of the Contractor and all subcontractors on the Work to comply with these requirements including, but not limited to, the salaries and benefits for City employees who are unable to work due to exposure to COVID -19 as a resuilt of such failure, and workers compensation benefits and expenses. Delays in the Work resulting from Contractor’s or its subcontractor’s failure to comply with these regulations shall not be considered an unforeseen event entitling Contractor to an extension of time or payment f or delay pursuant to Section 6-6 of the Standard Specifications.

12100-0001\2410807v5.doc City
of MB Form
GP-63

11-13 CONTRACTOR’S REPRESENTATIONS
By signing the Contract, the Contractor represents, covenants, agrees, and declares under penalty of perjury under the laws of the State of California that: (a ) the Contractor is licensed, qualified, and capable of furnishing the labor, materials, and expertise necessary to perform the services in accordance with the terms and conditions set forth in the Contract Documents ; (b) there are no obligations, commitments, or impediments of any kind that will limit or prevent its full performance under the Contract Documents; (c) there is no litigation pending against the Contractor that could adversely affect its performance of the Contract, and the Contractor is not the subject of any criminal investigation or proceeding; and (d) to the Contractor’s actual knowledge, neither the Contractor nor its personnel have been convicted of a felony. 11-14 CONFLICTS OF INTEREST
The Contractor agrees not to accept any employment o r representation during the term of the Contract or within 12 months after acceptance as defined in Section 6 -8.2 of the General Provisions that is or may likely make the Contractor “financially interested,” as provided in Government Code Sections 1090 and 87100, in any decisions made by the City on any matter in connection with which the Contractor has been retained pursuant to the Contract Documents. 11-15 APPLICABLE LAW
The validity, interpretation, and performance of these Contract Documents shall be controlled by and construed under the laws of the State of California, excluding California’s choice of law rules.

Venue for any such action relating to the Contract shall be in the Los Angeles County Superior Court.
11-16 TIME
Time is of the essence in these Contract Documents.
11-17 INDEPENDENT CONTRACTOR
The Contractor and Subcontractors shall at all times remain, as to the City, wholly independent contractors. Neither the City nor any of its officials, officers, employees or agents shall have control over the conduct of the Contractor, Subcontractors, or any of their officers, employees, or agents, except as herein set forth, and the Contractor and Subcontractors are free to dispose of all portions of their time and activities that they are not obligated to devote to the City in such a manner and to such Persons that the Contractor or Subcontractors wish except as expressly provided in these Contract Documents. The Contractor and Subcontractors shall have no power to incur any debt, obligation, or liabil ity on behalf of the City, bind the City in any manner, or otherwise act on behalf of the City as agents. The Contractor and Subcontractors shall not, at any time or in any manner, represent that they or any of their agents, servants or employees, are in any manner agents, servants or employees of the City. The Contractor and Subcontractors agree to pay all required taxes on amounts paid to them under the Contract, and to indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by the Contract Documents. The Contractor shall include this provision in all contracts with all Subcontractors.

12100-0001\2410807v5.doc City
of MB Form
GP-64

11-18 CONSTRUCTION
In the event of any as serted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of these Contract Documents shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Contract Documents or who drafted that portion of the Contract Documents.
11-19 NON-WAIVER OF TERMS, RIGHTS AND REMEDIES
Waiver by either party of any one or more of the conditions of performance under these Contract Documents shall not be a waiver of any other condition of performance under these Contract Documents. In no event shall the making by the City of any payment to the Contractor constitute or be construed as a waiver by the City of any breach of co venant, or any default that may then exist on the part of the Contractor, and the making of any such payment by the City shall in no way impair or prejudice any right or remedy available to the City with regard to such breach or default.
11-20 TERM
The Contract is effective as of the Effective Date listed, and shall remain in full force and effect until the Contractor has fully rendered the services required by the Contract Documents or the Contract has been otherwise terminated by the City. However, some provisions may survive the term listed within this Section, as stated in those provisions. 11-21 NOTICE
Except as otherwise required by law, any notice or other communication authorized or required by these Contract Documents shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during the City’s regular business hours or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses listed on the Contractor’s Bid and City Hall, or at such other address as one party may notify the other.
11-22 SEVERABILITY
If any term or portion of these Contract Documents is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of these Contract Documents shall continue in full force and effect.

12100-0001\2410807v5.doc City
of MB Form
SP-1

SPECIAL PROVISIONS

12100-0001\2410807v5.doc City
of MB Form
SI-1

PART I: SPECIAL INSTRUCTIONS

I. GENERAL
The contractor may be supplied a list of work locations for sidewalk, ramp, curb and gutter, driveway, PCC street, etc. every quarterly (3 month minimum) valued around approximately $62,500.00 per time. The contractor must mobilize and complete the City provided work list and complete the work list within 45 working days from issuance the notice to proceed, liquidated damages will be charge daily after the 45 working days.

Work shall start within 7 calendar days from the date of receipt of written quarterly notice to proceed from the City Engineer. Locations will be on one of the streets shown on the Vicinity Map within the City of Manhattan Beach included in. There are not major or minor bid items as describe in Section 1 of the General Provisions. Contractor will only be paid per unit price listed regardless of amount unit work completed.

II. SEQUENCE OF WORK
Contractor shall submit to the City for approval a Sequence of Work plan that minimize d impacts to pedestrian access and traffic flow due to the closure and minimizes impacts to residents, City visitors, and business entities in the City . The City shall approve this Sequence of Work plan before work begins.

III. CONSTRUCTION SCHEDULE

The Contractor shall coordinate construction activities with the City’s refuse company and street sweeping company. Refuse pick-up is performed by Waste Management (310-830- 7100), and street sweeping is performed by Athens Services (888-336-6100).

IV. STORAGE OF EQUIPMENT AND MATERIALS

Spoils from excavation shall be immediately removed from the project site. Overnight storage of materials removed or equipment shall not be permitted on the traveled roadway surface.

Full compensation for compliance with these requirements shall be considered as included in the appropriate bid items.

V. CONSTRUCTION STAGING AREAS

Contractor shall be responsible for securing a construction staging area for this project.

The Contractor may elect to contact the Manhattan Beach Unified School District (MBUSD) in regards to using the parking lot on Peck Avenue above Begg Field and Begg Pool for a construction staging area for this project. Any coordination or agreement with the MBUSD is independent of this Contract and is not guaranteed. The City will not

12100-0001\2410807v5.doc City
of MB Form
SI-2

facilitate any coordination or agreement with the MBUSD regarding securing a construction staging area. If the Contractor elects to contract with the MBUSD, the MBUSD may require the Contractor to install “No Parking” signs or to resurface and stripe the MBUSD’s lower parking lot adjacent to Begg Pool.

The cost of securing a staging area shall be considered as included in the Contract prices paid for the various items of work involved and no additional compensation will be allowed therefor.

VI. PROTECT IN PLACE MANHOLES, VALVE COVERS, AND SURVEY MONUMENT

FRAMES, COVERS, AND SLEEVES

Contractor is responsible for clean -up of any debris on, around, or in the manholes or valve cover s. Existing survey markers, monuments, and benchmarks shall also be protected in place. Contractor shall walk with the City’s Inspector to inspect each manhole and valve at the end of the project to ensure compliance.

VII. WORK HOURS

Work hours shall be 7:30 AM - 4:30 PM, Monday through Friday, with the exception of City holidays. Contractor must obtain prior approval from the City and notify all business entities affected by the planned work for any work outside of these hours, including work during nights and weekends.

VII. NOTIFICATION OF BUSINESSES AND RESIDENTS
Contractor shall create a custom notification of work being performed for each business entity and residence affected by work on this project and place these notifications as appropriate outside each business entity and residence impacted by the day’s work and updated the placement of these notifications on a daily basis. The contract shall submit a draft of the notice to the City for review and approval prior to post the construction notice.

The construction notice shall include:
1) The name of the Contractor,
2) The dates and times work shall be performed in front of each business entity and residence 48 hours prior to commence of the work,
3) Provide a contact name and phone number for the Contractor’s primary contact for the public. The provided phone number shall be a direct phone number, such as a cell phone number, for the Contractor’s primary contact. The office number for the Contractor will not be acceptable in lieu of the Contractor’s primary contact’s direct phone number.

The expected time between the delivery of the notification and the start of work is seven to ten working days.

In all streets properly poste “TEMPORARY NO PARKING ANYTIME” signs at least 72 hours before start of work regardless of street width and parking conditions. The contract shall notify the police department immediately upon posting signs.

Changes to previously published information will necessitate the distribution of additional

12100-0001\2410807v5.doc City
of MB Form
SI-3

notices and could result in a delay in the work at no cost to the City.

VIII. SOIL CONDITIONS
Contractor shall be aware that the soil conditions in the project are a very sandy and collapsible. Contractor shall use appropriate construction methods for this soil type when removing and replacing PCC curb, gutter, PCC Concrete Street, and sidewalk.

VIIII. ACCESS
Vehicular travel lanes in both directions must be maintained at all times on all roadways to project site.

All driveway access must remain open at all times although flag ging operations may be required during work hours. Outside work hours steel plate texture pin in-place or other measures may be put in place to facilitate full unrestricted access. All streets and alleys must be plated, cleaned up and ready for traffic a t the end of each workday, unless otherwise allowed by the City Engineer.

Vehicular and pedestrian access to adjacent properties shall be provide at all times. Close sidewalks shall be posted with “SIDEWALK CLOSE” signs at each approach to the closure and approved alternative route provided with directional signs.

IX. CITY DEPARTMENT NOTIFICATION AND TRAFFIC CONTROL
The Contractor shall notify the following City Departments 24 hours prior to the start of work at any location, and 24 hours prior to the pa rtial closing of a street or alley within the City of Manhattan Beach.

MANHATTAN BEACH PUBLIC WORKS DEPARTMENT
Adilia Miller, Senior Civil Engineer (310.802.5362)

Public Works Inspector (310.802.5306)

MANHATTAN BEACH POLICE DEPARTMENT
Notify Dispatcher’s Office (310.545.4566)

MANHATTAN BEACH FIRE DEPARTMENT
Notify Dispatcher's Office (310. 545.4566)

WASTE MANAGEMENT
Notify Felipe Barrera (310.830-7100)

Routine schedule street sweeping is performed by Athens Services (888-336-6qua).

CONSTRUCTION SIGNS

All signs, delineators, barricades, etc., shall conform to the State of California Standard Specifications latest edition, the California Department of Transportation “Manual of Traffic Control for Construction and Maintenance Work Zones: (latest edition), and the “WATCH”,

12100-0001\2410807v5.doc City
of MB Form
SI-4

latest edition. The Contractor shall provide delineation, barricades, electronic message boards and necessary signs for partial street closures, as directed by the City Engineer.

The City Engineer shall provide appropriate wording for the signs. All barricades shall be equipped with flashing/steady burn warning lamps at night. All cones, delineators, barricades, and "k" rail shall be reflectorized. All traffic control shall be kept in their proper position at all times, and shall be repaired, replaced, or cleaned as necessary to preserve their appearance and continuity. Any devices not part of the required traffic control or detours shall be removed from the view of the travelling public immediately.

FLASHING ARROW SIGNS
For arterial and collector streets, the Contractor shall furnish and maintain solar-powered flashing arrow signs (FAS) during lane closures on arterial and collector streets. The City Engineer shall determine when FAS is required at any location. The cost of these signs shall be included in the unit prices bid for the particular items of work where such signs may be required.

X. CONTRACTOR’S RESPONSIBILITY
1) The Contractor shall take all necessary measures to obtain a normal flow of traffic to prevent accidents and to protect the work throughout the construction stages until completion of the work. The Contractor shall make the necessary arrangements to provide and maintain barriers, cones, guards, barricades, and construction warnings and regulatory signs. The Contractor shall take measures necessary to protect all other portions of the work during construction and until completion, providing and maintaining all necessary barriers, barricade lights, guards, temporary crossovers and watchmen.

In ad dition to the foregoing traffic control and safety measures, the Contractor shall undertake immediately to implement any measures requested by the City Engineer, as deemed necessary to ensure the proper flow of traffic and the protection of the public and the safety of the workers. The Contractor shall maintain at all times the ability to respond to calls from the Manhattan Beach Police Department during non-working hours to replace or provide additional traffic control or safety devices as shall be requir ed by the Police Department.

2) The Contractor shall notify the MTA Bus Stops and Zones Dispatcher and any other affected transit services at least two working days prior to construction and any impacts.

Evidence of such notification shall be submitted to the City at least two working days prior to construction and any impacts.

3) Protect traffic signal detectors in place or replace within 5 calendar days of final paving.

All detectors damaged by the work shall be replaced to the standards of the City Pub lic Works Department.

4) Contractor shall coordinate all work in the vicinity of schools with the school administrators to minimize construction impacts on special dismissal and school event days.

5) The contractor shall be responsible for the establishm ent, maintenance and decommission when considered appropriate by the Engineer of the following:

12100-0001\2410807v5.doc City
of MB Form
SI-5

a. Protection and restoration of existing improvements: Contractor shall protect, relocate, repair, replace or re -establish all existing improvements within the project limits which are not designated for removal (i.e. signs, markings, striping, posts, curb, gutter, sidewalk, ADA detectable warning devices, asphalt, plants, irrigation infrastructure, fences, walls, structures, survey control monumentation, etc.) which are damaged or removed as a result of its operations or as required by the Plans and Specifications. Relocations, repairs, replacements or re -establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions at contractor’s expense to the satisfaction of the Engineer.

b. Paths of travel: Contractor is required to provide a pedestrian management plan to show how pedestrians are detoured around each construction area

c. Construction work within any pedestrian pathways:

1. No travel lanes, pedestrian xings or other means of accesibility to any school facilities shall be disturbed by construction activities between 7:30 AM to 8:30 AM and 1:30 PM to 3:30 PM on school days unless otherwise approved by the City Traffic Engineer.

Contractor shall coordinate all work in the vicinity of schools with the school administrators to minimize construction impacts on special dismissal and school event days.

6) The contractor shall protect the new concrete for sufficient time to avoid vandalism or traffic damage to the surface. Contract shall use steel plate texture to protect fresh concrete if left overnight along with appropriate and safe traffic control devices. 7) Protection of existing utility infrastructure, conduits, landscape planting and irrigation systems. Repairs to damaged irrigation lines or sprinkler heads shall be made within 48 hours.
8) Finish grading of the soil adjacent to new sidewalk and areas disturbed during construction operations if excavation was required. Parkway fill materials shall be Class A topsoil. Repair lawn areas that may have been damaged with suitable top soil and reseeding.
9) Do not cause any damage to landscaping, retaining walls, curbs, sprinkler heads, utility covers or other objects adjacent to sidewalks. If your equipment does cause damage to any existing improvements, the City’s Project Manager/Supervising Public Works Inspector must be notified immediately and damages must be repaired at the CONTRACTOR’s expense within 24 hours of the time the damage occurred. 10) The Contractor shall repair and replace all landscaped areas damaged by construction activity within 48 hours to the satisfaction of the City Engineer. The Contractor shall re-sod lawns (with like materials) that have been damaged or removed using suitable topsoil. Plant material shall be replaced with like size and material. 11) The Contractor shall clean and sweep all work areas by the end of each workday.

No tree roots are to be trimmed/cut without prior written approval from the city’s arborist Ernest Area: (310-802-5305). The Contractor shall remove all debris (including tree

12100-0001\2410807v5.doc City
of MB Form
SI-6

roots that have been approved for cutting by Ernest Area) by the end of each workday.

The Contractor shall remove any barricades used to protect the construction site in a timely fashion. No open excavation will be permitted to extend into a weekend or holiday.
12) The Contractor shall furnish and install all necessary striping, markings and plastic reflective pavement markers (white or yellow) to provide temporary pavement striping, markers and markings while construction operations are underway. The temporary pavement markers shall be placed ten (10) feet on center. The temporary striping, markers and markings shall be maintained until the permanent striping and markings are applied. The work to furnish, install and maintain ALL temporary striping, markers and markings shall be included under the various items of work. 13) The Contractor shall maintain the construction site during non-working hours in a clean and safe condition. The Contractor will replace any newly laid concrete that is damaged or scarred. The Contractor shall be available for immediate mitigation measures should the City Engineer decide that appropriate action is necessary during non-working hours.
14) At the Pre-Construction meeting; the City will require the Contractor to furnish a cellular phone number that will be furnished to residents with questions or complaints regarding the Contractor’s work. The Contractor should designate a public liaison person to handle all resident inquiries. The Contractor shall respond to residents’ inquiries within one hour of the call during normal working hours (7:30am to 4:30pm).

When dealing with residents, common courtesy is required. 15) The Contractor will be responsible for delivering City prepared construction notification letters to all residents or business owners affected by any of the contract work. The expected time between the delivery of the notification and the start of work is seven to ten working days. Special consideration should be paid to residents or business owners whose access will be affected by the work such that these people know exactly which day operations will start and end. It is imperative that the Contractor follow through on construction schedules that have been shared with city staff, residents and business owners. Changes to previously published information will necessitate the distribution of additional notices and could result in a delay in the work at no cost to the City.
16) Reflective tape shall be used at the edges of all steel plates in sidewalk or crosswalk areas. The Contractor shall control his work so as to minimize the use of steel plates within sidewalk and crosswalk areas.
17) Thermoplastic striping and markings shall be used and may be applied a minimum of seven (7) days after the concrete paving operations. Where apply, raised pavement markers shall be applied after striping.
18) Curb painting shall be applied a minimum of seven (7) days after the concrete operations.

XI. CONTRACTOR’S DAILY REPORTS

12100-0001\2410807v5.doc City
of MB Form
SI-7

The Contactor shall submit a completed Contractor’s Daily Report to the City every working day by 5:30pm. The Contractor’s Daily Report shall identify the full name of each person working onsite and the type of work performed and duration the work is performed for each person. The Contractor is responsible for including all members of the Contractor’s crews and its subcontractors’ crews. The Contractor’s Daily Report shall also describe the work completed and the quantities used for each bid items. All material delivery tickets and weight tickets for construction waste or recycling shall be submitted to the City with the Contractor’s Daily Reports. Progress payments shall be contingent upon the receipt of the Contractor’s Daily Reports and all supporting documentation described in this Section.

XII. LOOK AHEAD SCHEDULE
Two Week Look Ahead Schedules shall be submitted to the City three (3) working days prior to commence the quarterly construction activities and every Monday until all construction locations list are completed.

XIII. COORDINATION WITH SCHOOLS
Contractor shall coordinate all work in the vicinity of schools with the school administrators to minimize construction impacts on special dismissal and school event days.

12100-0001\2410807v5.doc City
of MB Form
TP-1

PART II: STANDARD AND SPECIAL TECHNICAL PROVISIONS

SECTION 1

CONSTRUCTION MATERIALS
Section 201 – Concrete, Mortar, and related Materials
201-1 Portland Cement Concrete
201-1.1 Requirements
201-1.1.1 General
The following paragraph shall be added following paragraph 3:

The Contractor shall furnish the Engineer with a copy of the mix design to the used and with a legible, certified weight-master’s certificate for each load of P.C.C. delivered to the project. Portland Cement Concrete delivered to the project site having a water content and/or slump greater that the specified in the mix design shall be rejected and removed from the project site. 201-1.1.2 Concrete Specified by Class
Portland Cement Concrete (PCC) Design Mix. All concrete shall be 560-C-3250 PCC in accordance with the City of Manhattan Beach Standard Plans. Design mix shall be approved by the City Engineer prior to purchase or placing of concrete.

Section 214 – Traffic Stripping, Curb and Pavement Markings, and Pavement Markers 214-5 Thermoplastic Material for Traffic Striping and Markings 214-5.1 General
Delete 1st Paragraph and add the following:

Thermoplastic material shall conform to State Specification PTH-02ALKYD.

Concrete Curb Painting shall be as follows:

Red: Ennis-Flint WB RED 7004PLUS SEMIGLOSS or approved equal.

Yellow: Ennis-Flint WB YEL CA PTWB-01 or approved equal.

White: Ennis-Flint WB WHT CA PTWB-01 or approved equal.

Black: Ennis-Flint WB BLK CA PTWB-01 or approved equal.

Blue: Ennis-Flint 6006 – Blue or approved equal

12100-0001\2410807v5.doc City
of MB Form
TP-2

SECTION 2

CONSTRUCTION METHODS

Section 300 – Earthwork
300-1 Clearing and Grubbing
300-1.1 General
All work shall be constructed in accordance with the current edition of Standard Specifications for Public Works (“Greenbook”).

Add the following:

Contractor shall have a valid class “A” or “C8” California contractor’s License.

The Contractor shall comply with Section 10 of the Contract Documents:

Construction and Demolition Waste Management of the City of Manhattan Beach.

All existing PCC pavement to be removed shall be done by sawcut full depth, to a true line where new concrete pavement is to join. Removal of these PCC items shall include the removal of underlying base to a depth necessary to construct new structure.

Removal and haul away of interfering tree and groundcover roots under the supervision of the City’s arborist Ernest Area: 310-802-5305. No tree roots are to be pruning/cut without prior written approval from the City’s arborist Ernest Area:
310-802-5305.

300-1.4 Payment
Delete and replace with the following:

All the unit bid items price shall include the full compensation for clearing and grubbing including saw cutting, breaking, removal, tree root pruning/cut, and haul away required to perform the construction specified shall be considered included in the price for various items of work and no additional compensation will be allowed, except for other removal items under the Contractor’s Proposal Bid Schedule and shall be paid as indicated therein.

300-2 Unclassified Excavation
300-2.9 Payment

12100-0001\2410807v5.doc City
of MB Form
TP-3

Delete first sentence of the subsection and replace with the following:

The cost of unclassified excavation are included in various applicable bid items in the Construction’s Proposal Bid Schedule.
300-3 Structure Excavation and Backfill
300-3.1 General
Add the following:

PCC work such as curb ramps, driveways, curb and gutter, sidewalk, streets, and other structures shall follow the City of Manhattan Beach Standard Plans. 300-3.6 Payment
Add the following:

There will be no payment for structural excavation and backfill. Cost of structural excavation and structural backfill shall be considered included in the applicable bid items.

Section 301 – Subgrade Preparation, Treated Materials, and Placement of Base Materials 301-1.1 General
This Subsection shall govern the preparation of natural, filled, or excavated roadbed material prior to the placement of subbase of base material, pavement, curbs and gutters, driveways, sidewalk, or other roadway structures. 301-1.6 Adjustment of Manhole Frame and Cover Sets to Grade Add the following:

Operations shall be conducted in such manner that existing road facilities and utilities which are to remain in place will not be damaged. The water meter box and utility vault shall be adjusted to grade by the Contractor. Prior to adjustment, the Contractor shall notify the utility owners.
301-1.7 Payment
Add the following:

Payment for adjusting water meter cover, water valve box, City-owned sewer/stormdrain manhole and utility vault cover to grade shall be paid per unit.

Adjust Water Valve Box Cover to Grade - The unit price bid per each water valve box cover shall include the cost for all the work involved in adjusting the water valve sleeve and cover to finish grade and shall include all material, contractor mobilization, traffic control, and all work to complete the job of final

12100-0001\2410807v5.doc City
of MB Form
TP-4

grade during the PCC paving or when the paving is complete and will be at the locations identified on list provided by City’s Project Manager. Other non-city owned utility structures shall be set to grade by the respective utility provider owner upon notice by the contractor and coordinated with the City’s Project Manager.

Adjust Water Meter Box to Grade - The unit price bid per each water meter box shall include the cost for, all work involved in replacing the existing water meter box and adjusting it to finish grade and shall include all materials, contractor mobilization, traffic control, and work to complete the job of final grade setting before paving or concrete placement. The City of Manhattan Beach Water Division will not provide the replacement water meter boxes. Water meters shall be replace with ARMORCAST Products, see drawings A6001921X12, A6001922T-9X, A6001922, A6001922T, A6001922SMT, A6000485, A600048T, A6001946PCX12, A6001866, A6001969, A6001419, A6001420T, A6001640PCX12, A6001643, A6001947T.

Adjust City-Owned Sewer/Stormdrain Manhole (Precast and Brick) Frame Cover to Grade – The unit price bid per each sewer/stormdrain manhole cover shall include the contractor mobilization, traffic control, and cost for all work and materials involved in adjusting each manhole (precast or brick) frame and cover to finished pavement grade either before or after the concrete repaving is completed. The City of Manhattan Beach Wastewater Division will provide the replacement manhole covers as necessary (if the manhole cover is on bad conditions). Adjustment of manholes and structures shall be in accordance with Standard Plans for Public Works Construction Standard Plan No. 205-2 and No.206-2 (2012 Edition). The work of setting to new grade the tops of manholes or other structures belonging to public utility companies will be done by said companies. The Contractor shall coordinate the manhole adjustments with the appropriate utility and shall be responsible for all costs associated with coordinating with the utility owner and for having the utility owner adjust the manhole frame and cover to grade.

The utility companies shall be notified by the Contractor within 48 hours after PCC paving as to locations, size and/or description of structure involved.

302-6 Portland Cement Concrete Pavement
302-6.1 General
Add the following:

Replace the Portland Cement Concrete (PCC) Pavement to match the existing depth of PCC plus 1”. The Roadway PCC pavement shall be of Concrete Class No. 560-C-3250. See City of Manhattan Beach Standard Plan MBSI-133A-1 All traffic striping and/or markings removed by restoration work shall be replaced with Thermoplastic material and shall conform to State Specification PTH-02ALKYD.

12100-0001\2410807v5.doc City
of MB Form
TP-5

Concrete Curb Painting shall be as follows:

Red: Ennis-Flint WB RED 7004PLUS SEMIGLOSS or approved equal.

Yellow: Ennis-Flint WB YEL CA PTWB-01 or approved equal.

White: Ennis-Flint WB WHT CA PTWB-01 or approved equal.

Black: Ennis-Flint WB BLK CA PTWB-01 or approved equal.

Blue: Ennis-Flint 6006 – Blue or approved equal

302-6.3 Placing Concrete
Concrete shall be install by section 302-6.3 of the Standard Specification.

Add the following:

Advice the Engineer at least 48 hours before concrete placement.

Testing responsibility of Contractor – Conduct a minimum of one density test during each day’s placement in accordance with ASTM C172 and C 138/C 138M following procedures described in ASTM C 29/C 29M, Jigging Procedures.

Determine density using a minimum 0.25 ft³ cylindrical metal measure. Fill and compact the measure in accordance with ASTM C29/c 29M, Jigging procedure. 302-6.3.1 General
302-6.5 Joints
302-6.5.1 General
302-6.5.2 Construction Joints
Longitudinal construction joints shall be constructed by the following method 1) A plain face.

Longitudinal Joints shall be constructed in multiples of 10’ not exceeding 12’. 302-6.5.3 Transverse Expansion Joints
Add the following:

Construct Transverse joints at right angles to longitudinal joints intervals not exceeding 14’.

Concrete restoration must be doweled to existing concrete pavement with #4 dowels epoxy coated at 16”O.C. and minimum embedment of 4”.

Expansion joint filler and join sealants shall be install by section 201-3 of the Standard Specification. The joint sealant shall be a two-component, non-sag traffic-grade material. It shall be applicable in horizontal, vertical, and overhead joints. The sealant shall be principally a chemical cure to form an elastomeric substance.

12100-0001\2410807v5.doc City
of MB Form
TP-6

302-6.5.4 Weakened-Planed Joints
Add the following:

Weakened –Maximum intervals shall be 12’.

Expansion joint filler and join sealants shall be install by section 201-3 of the Standard Specification. The joint sealant shall be a two-component, non-sag traffic-grade material. It shall be applicable in horizontal, vertical, and overhead joints. The sealant shall be principally a chemical cure to form an elastomeric substance.
302-6.6 Curing
Add the following:

Provide high early strength set-accelerating admixture options. The set- accelerating admixture shall be non-chloride set accelerator and shall not contain purposely added chlorides or contribute to steel corrosion.

Chemical admixture shall be used in accordance with 201-1.2.4 and at the manufacturer’s specified dosage rate.

302-6.7 Traffic and Use Provisions
Pavement constructed of concrete which has been treated in accordance with 201-1 to obtain and early increase in strength may be opened to traffic 3 days after it is placed, if directed by the Engineer.

302-6.8 Measurement and Payment
Payment for concrete pavement will be made on a square feet basis shown on the Bid unit price as shown in the bid schedule and shall include all related debris removal, grading, edge form work, mobilization, traffic control and erosion control, parking striping, street markings, curb paint, saw cutting, expansion joint filler, joint sealer, base material, steel plates texture, and other related appurtenances integral to the proposed PCC rehabilitation and shall be considered full compensation for furnishing all labor, materials, tools equipment and incidental to accomplish the work as specified in these project plans and provision and no additional compensation shall be allowed.

Add the following:

Material which is deliver to project site and not used or is rejected and specifically, material which is delivered to the site in excess of that actually needed, will not be paid for.

12100-0001\2410807v5.doc City
of MB Form
TP-7

Section 303 - Concrete and Masonry Construction
303-5 - Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps and Driveways
303-5.1 Requirements
303-5.1.1 General
The second paragraph shall be deleted and replaced with the following:

The thickness, texture, and color (to match existing color) of sidewalks, curb, gutters, driveways, cross gutters, and access ramps, shall be as shown on City of Manhattan Beach Standard plans.
 MBSI-110A-1(ST-1) Residential Driveway Approach (R/W width behind curb 8” or more)  MBSI-110B-1(ST-1) Residential Driveway Approach (R/W width behind curb 10” or more)
 MBSI-110C-1 (ST-1) Residential Driveway Approach (For confined right-of-way)  MBSI-111A-0 (ST-9) Curb Ramp – Not Currently in Use (Please refer to latest Caltrans Standard A88) also, see notes below.
 MBSI-112A-0 (ST-2) Standard Sidewalk
 MBSI-115D-0 Sidewalk Placement Around Obstructions
 MBSI-116A-0 Commercial Driveway Approach: Type I
 MBSI-116B-0 Commercial Driveway Approach: Type II
 MBSI-116C-0 Commercial Driveway Approach: Type III
 MBSI-116D-0 Commercial Driveway Approach: Type IV
 MBSI-120A-0 (ST-3) Standard Curb and Gutter
 MBSI-121A-0 Type C Rolled Curb
 MBSI-122A-0 (ST-12) Standard Cross Gutter

No concrete shall be ordered and/or poured until the forms and subgrade have been inspected and approved by the Engineer in the field.

All pull boxes, water meter boxes, and water valve covers shall be adjusted to proposed finish grade and approved by the Engineer in the field prior to placement of the concrete: i.e., curbs, walks, gutters, etc.

Add the following:

ADA Curb Ramp Compliance and Installation:

The Contractor shall install access ramps with American D isability Act (ADA) Standards/California Code of Regulations (CCR) Title 24 – Accessibility Regulations approved cast-in place/wet set detectable warning surface (truncated domes) and per the latest edition of applicable City Standard Plans.

The Contractor shall construct all curb ramp case types ramp up to 15 feet from the edge of landing to satisfied ADA slope and the Department of Justice requirement to the extent possible.

12100-0001\2410807v5.doc City
of MB Form
TP-8

The Contractor shall verify on site all existing elevations for the installation/modification of the curb ramps and sidewalk transition panels and verify that all design grades are achievable with site conditions. The installation of the curb ramp shall maintain all existing cross gutter, flow line and lip of gutter elevations and grades and shall be in compliance with all applicable ADA standards. Written approval from the Engineer is required prior to construction of the curb ramps.

If ramps cannot achieve ADA compliance, then the Contractor shall hire a register Civil Engineer to custom design curb ramps to ensure ADA compliance. The contractor needs to reconstruct the ramps to the “maximum extent possible” as designed by his/her engineer and the engineer shall sign and stamp the ADA memo included in Appendix IV (Template).

Work under bid item, custom design curb ramps by registered civil engineer to ensure ADA compliance, shall include full compensation for furnishing labor, materials, tools and incidentals, and for performing all work involved in the design of the curb ramp by registered civil engineer to ensure ADA compliance, complete as specified herein; including but not limited to research of record drawings, survey, design, ensuring ADA compliance, or if not achievable due to existing site conditions design to the maximum extent possible, coordination, submittals, and approval with/from the City, construction support, prepare, sign, stamp the as-built memorandum (see Appendix IV), and other appurtenance to complete work . Payment for custom design curb ramps is per each upon full completion of all work associated with this bid item.

Work under bid item, Furnish and Install ADA compliant curb ramp shall include full compensation for furnishing labor, materials, tools and incidentals, and for performing all work involved in the construction of new ADA curb ramps, complete as specified herein; including but not limited to, mobilization, traffic control, construction survey, saw-cutting, removal and disposal, excavation, forming, pavement restoration, detectable warning surface, support of adjacent structures including (protection, restoration, grading, irrigation turf replacement), furnish and install concrete to construct new ADA ramp, backfill and compaction to the satisfaction of the Engineer. Payment for each ramp is each upon full completion of all work associated with the ramp

303-5.2 Forms
303-5.2.1 Standard Forms
303-5.3 Placing Concrete
Add the following:

Advice the Engineer at least 48 hours before concrete placement.

Testing responsibility of Contractor – Conduct a minimum of one density test during each day’s placement in accordance with ASTM C172/C172M and C138/C138M following procedures described in ASTM C29/C29M, Jigging Procedures. Determine density using a minimum 0.25 ft³ cylindrical metal measure. Fill and compact the measure in accordance with ASTM C29/C29M, Jigging procedure.

12100-0001\2410807v5.doc City
of MB Form
TP-9

303-5.4 Joints
303-5.4.1 General
Joints in concrete curb, gutter, and walk shall be designated as expansion joints and weakened plane joints.

Add the following:

Refer to the City of Manhattan Beach Standard Plans:
 MBSI-110A-1(ST-1) Residential Driveway Approach (R/W width behind curb 8” or more)  MBSI-110B-1(ST-1) Residential Driveway Approach (R/W width behind curb 10” or more)
 MBSI-110C-1 (ST-1) Residential Driveway Approach (For confined right-of-way)  MBSI-111A-0 (ST-9) Curb Ramp – Not Currently in Use (Please refer to latest Caltrans Standard A88 or Greenbook Standard Plan 111 for Curb Ramps)  MBSI-112A-0 (ST-2) Standard Sidewalk
 MBSI-115D-0 Sidewalk Placement Around Obstructions
 MBSI-116A-0 Commercial Driveway Approach: Type I
 MBSI-116B-0 Commercial Driveway Approach: Type II
 MBSI-116C-0 Commercial Driveway Approach: Type III
 MBSI-116D-0 Commercial Driveway Approach: Type IV
 MBSI-120A-0 (ST-3) Standard Curb and Gutter
 MBSI-121A-0 Type C Rolled Curb
 MBSI-122A-0 (ST-12) Standard Cross Gutter
303-5.5 Finishing
303-5.5.1 General
Finishing shall be completed as specified herein for the type work being performed
Add the following:

Finishing: Concrete shall be distributed uniformly between forms or saw cut joints as soon as placed, struck off and tamped. After tamping, surface shall be floated and finished. Finish shall match existing concrete as closely as practical. Work surface shall be free of any unevenness greater than1/8 -inch when checked with a 10’ straightedge or string line.

Refer to the City of Manhattan Beach Standard Plans:
 MBSI-110A-1(ST-1) Residential Driveway Approach (R/W width behind curb 8” or more)  MBSI-110B-1(ST-1) Residential Driveway Approach (R/W width behind curb 10” or more)
 MBSI-110C-1 (ST-1) Residential Driveway Approach (For confined right-of-way)  MBSI-111A-0 (ST-9) Curb Ramp – Not Currently in Use (Please refer to latest Caltra ns Standard A88 or Greenbook Standard Plan 111 for Curb Ramps)

12100-0001\2410807v5.doc City
of MB Form
TP-10

 MBSI-112A-0 (ST-2) Standard Sidewalk
 MBSI-115D-0 Sidewalk Placement Around Obstructions
 MBSI-116A-0 Commercial Driveway Approach: Type I
 MBSI-116B-0 Commercial Driveway Approach: Type II
 MBSI-116C-0 Commercial Driveway Approach: Type III
 MBSI-116D-0 Commercial Driveway Approach: Type IV
 MBSI-120A-0 (ST-3) Standard Curb and Gutter
 MBSI-121A-0 Type C Rolled Curb
 MBSI-122A-0 (ST-12) Standard Cross Gutter

303-5.6 Curing
Add the following:

Provide high early strength set-accelerating admixture options. The set- accelerating admixture shall be non-chloride set accelerator and shall not contain purposely added chlorides or contribute to steel corrosion.

Chemical admixture shall be used in accordance with 201-1.2.4 and at the manufacturer’s specified dosage rate.
303-5.7 Repair and Replacement
303-5.8 Backfilling and Cleanup
303-5.6 Measurement and Payment
Payment for concrete curbs and gutter, sidewalks, cross gutters, driveways and access ramps will be made as shown in the bid schedule and shall include all related debris removal, root pruning, grading, edge form work, mobilization, traffic control and erosion control, parking striping, curb paint, removal and restoration of adjacent asphalt (Type III C3-PG64-10) slot cut patch restoration, saw cutting, expansion joint filler, joint sealer, base material, steel plates texture, and other related appurtenances integral to the proposed PCC rehabilitation and shall be considered full compensation for furnishing all labor, materials, tools equipment and incidental to accomplish the work as specified in these project plans and provision and no additional compensation shall be allowed.

Add the following:

Material which is deliver to project site and not used or is rejected and specifically, material which is delivered to the site in excess of that actually needed, will not be paid for.

12100-0001\2410807v5.doc City
of MB Form
TP-11

FURNISH AND INSTALL 2 FEET WIDE PERVIOUS CONCRETE GUTTER OVER 6 INCHES

CAB OVER FILTER FABRIC

Products
Pervious Concrete : Comply with ASTM C 94/C 94M
Filter Fabric shall be MIRAFI 140N or approved equivalent.

Execution
Subgrade and Base preparation

1. Prepare subgrade and base as specified in the Manhattan Beach Standard Drawing MBSI-123A.

Batching, mixing and delivery

1. Batch and mix in compliance with ASTM C 94/C 94M except that discharge shall be completed within 60 minutes of the introduction of mixture water to the cement.

Increase time to 90 minutes when using an extended set control admixture meeting the requirements of ASTM C 494/C, 494M, Type B. Water addition, in accordance with ASTM C 94/C 94M, is permitted at the point of discharge. Do not exceed the maximum water-cementitious material ration (w/cm) specified or submitted.

Curing

1. Begin curing within 20 minutes of concrete discharge unless longer working time is accepted by the City Engineer.

2. Completely cover the pavement surface with a minimum 6 mil (0.15 mm) thick polyethylene sheet. Cut sheeting to a minimum of a full placement width.

3. Cover all exposed edges of pavement with polyethylene sheet.

4. Secure curing cover material without using dirt.

5. Cure pavement for a minimum of 7 uninterrupted days, unless otherwise specified.

Hot-and-cold-weather construction

1. When hot weather is anticipated, submit detailed procedures for the production, transportation, placement, protection, curing and temperature monitoring of concrete during hot weather.

2. In cold weather, comply with ACI 306.1, recording temperature no less than twice per 24- hour period.

Jointing

1. Construct joints at the locations, depths, and with horizontal dimensions indicated in the Manhattan Beach standard plan MBSI-123A.

12100-0001\2410807v5.doc City
of MB Form
TP-12

Opening to traffic
Do not open the pavement to bicycle or pedestrian traffic until the concrete has cured for at least 7 uninterrupted days and until the pavement is accepted by the Engineer for opening to traffic.

Test and inspect concrete materials an d operations as Wo rk progresses. Failure to detect defective Work or material early will not prevent rejection if a defect is discovered later, nor shall it constitute final acceptance.

Contractor qualification
The Contractor shall employ no less than one National Ready Mixed Concrete Association (NRMCA) certified pervious concrete craftsman or equivalent who must be onsite overseeing each placement crew during all concrete placement, or the Contractor shall employ no less than five NRMCA certified Pervious Concrete Technicians, or equivalents, who shall be on site working as members of each placement crew during all concrete placement unless otherwise specified.

Test Panels
Test panels may be placed at any of the final pervious concrete pavement placement locations.

The location is to be approved by the City Engineer. Test density of fresh concrete for the test panels in accordance with ASTM C 138/C 138M following the consolidation procedures described in ASTM C 29/C 29M, Jigging Procedure. Core hardened concrete fo r the test panels in accordance with ASTM C 42/C 42M, test thickness in accordance with ASTM C 174/C 174M, and test density in accordance with ASTM C 140, Paragraph 9.3.

1. Fresh density shall be within ±5 lb/ft3 (80 kg/m3) of the specified density.

2. Tolerance for thickness and unit weight reported as the average of three cores of each test panel shall be as follows:
a. The average compacted thickness shall not be 1/4 in. (6 mm) less than the specified thickness, with no single core exceeding 1/2 i n. (13 mm) less than the specified thickness; nor the average compacted thickness more than 1-1/2 in. (38 mm) more than the specified thickness.

b. The hardened density shall be within ±5 lb/ft3 (80 kg/m3) of the specified density.

3. When a test panel is outside one or more of the limits of 1.6.2.1 and 1.6.2.2, the test panel shall be rejected, removed, and replaced at the Contractor’s expense.

Testing agencies - Agencies that perform testing services on concrete materials shall m eet the requirements of ASTM C 1077. Agencies inspecting the Work shall meet the requirements of ASTM E 329. Testing agencies performing the testing shall be accepted by City Engineer before performing any Work.

1. Field tests of concrete required shal l be performed by an individual certified as an NRMCA Certified Pervious Concrete Technician or equivalent and an ACI Concrete Field Testing Technician – Grade 1 or equivalent.

Testing responsibilities of Contractor

1. Advise the City Engineer at least 48 hours before concrete placement.

12100-0001\2410807v5.doc City
of MB Form
TP-13

Testing

1. Conduct a minimum of one density test during each day’s placement in accordance with ASTM C 172 and C 138/C 138M following the consolidation procedures described in ASTM C 29/C 29M, Jigging Procedure. Determine density using a minimum 0.25 ft 3 (0.007 m3) cylindrical metal measure. Fill and compact the measure in accordance with ASTM C 29/C 29M, Jigging Procedure.

a. Fresh density shall be within ±5 lb/ft 3 (80 kg/m3) of the specified density.

2. Remove three cores from each lot of 5000 ft 2, in accordance with ASTM C 42/C 42M not less than 7 days after placement of the pervious concrete. Select three locations in accordance with ASTM D 3665. Measure the cores for thickness (ASTM 42/C 42M) and density (ASTM C 140). After thickness determination, trim and measure the cores for density in the saturated condition, Saturation, of ASTM C 140. Immerse the trimmed cores in water for 24 hours, drain for 1 minute, remove surface water with a damp cloth, then weigh immediately.

Tolerance for thickness and density reported as the average of three cores of each lot shall be as follows:

a. The average compacted thickness shall not be 1/4 in. (6 mm) less than the specified thickness, with no single core exc eeding 1/2 in. (13 mm) less than the specified thickness; nor the average compacted thickness more than 1-1/2 in. (38 mm) more than the specified thickness.

b. Hardened density shall be within ±5 lb/ft3 (80 kg/m3) of the specified density.

When a lot is outside one or more of the limits, the lot shall be rejected, removed, and replaced at the Contractor’s expense.

Core holes shall be filled with concrete.

Pervious concrete shall be measured by the linear foot as shown on the plans. Material which is delivered to the project site and not used or is rejected and specifically, material which is delivered to the site in excess of that actually needed, will not be paid for.

Payment for construction of 2’ wide pervious concrete gutter shall be made at the contract bid unit price as shown in the bid schedule and shall include all related mobilization, traffic control, debris removal, grading, edge form work, lan dscaping, irrigation and other related appurtenances per the standard plan and shall include the pervious concrete material and placement, crushed aggregate base material and compaction, filter fabric and shall be considered full compensation for furnishing all labor, materials, tools, equipment and incidentals to accomplish the work as specified in these project plans and provisions and no additional compensation shall be allowed.

Referenced standards

Standards of ACI and ASTM referred to in this specification are listed with serial designation including year of adoption or revision, and are part of this specification.

12100-0001\2410807v5.doc City
of MB Form
TP-14

ACI standards (latest editions available)

ASTM standards (latest editions available)

C 29/C 29M Test Method for Bulk Density (Unit Weight) and

Voids in Aggregate
C 33

Specification for Concrete Aggregates
C 42/C 42M Test Method for Obtaining and Testing Drilled

Cores and Sawed Beams of Concrete
C 94/C 94M Specification for Ready-Mixed Concrete

C 138/C 138M Test Method for Density (Unit Weight), Yield and Air Content (Gravimetric) of Concrete

C 140 Test Method for Sampling and Testing Concrete
Masonry Units and Related Units

C 172 Practice for Sampling Freshly Mixed Concrete

C 174/C 174M Test Method for Measuring Thickness of Concrete Elements Using Drilled Concrete Cores

C 494/C 494/M Specification for Chemical Admixtures for Concrete

C 1077 Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and
Criteria for Laboratory Evaluation

C 994 Specification for Preforme d Expansion Joint Filler for Concrete (Bituminous Type)

D 1751 Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction
(Nonextruding and Resilient Bituminous Types)

D 1752 Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion Joint Fillers for Concrete
Paving and Structural Construction

D 3385 Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer

D 3665 Practice for Random Sampling of Construction Materials

E 329 Specification for Agencies Engaged in Construction Inspection and/or Testing

12100-0001\2410807v5.doc City
of MB Form
TP-15

COLD MILL EXISTING ASPHALT CONCRETE

The area of the asphalt concrete pavement to be removed shall be cut on a neat and straight line, to the satisfaction of the Engineer, with a power-driven saw to full depth before removing the surfacing.

The Contractor will not be required to sawcut the pavement where the join line or cut line is cold milled.

The Contractor may encounter existing pavement fabric underneath existing asphalt concrete. The Contractor shall account for its removal and disposal at no additional cost.

If the Contractor chooses to remove the asphalt concrete by cold milling then the existing asphalt concrete shall be cold milled or ground in accordance with Subsection 302-1.1, "Cold Milling of Existing Pavement," of the Standard Specifications and these Specifications.

Add to Subsection 302-1.2, "Milling Machine," the following:

At least two full time flag persons shall be assigned to the milling machine for traffic control when working on streets open to traffic.

The Contractor shall take care not to contaminate the millings with non-aggregate base material, including disintegrated granite.

The asphalt concrete, including aggregate base, shall be disposed of at a recycling plant. The Contractor shall provide the City with the weight certification of recycling in tons of as phalt concrete and the required monthly Solid Waste Disposal and Recycling Reports.

Asphalt concrete removal associated with curb and gutter, cross gutter and local depression, sidewalk and driveway work will be considered as miscellaneous removals and pa yment will be considered as included in the price paid for Clearing, Grubbing, and Removals.

Cold Milled Asphalt Concrete - Existing asphalt concrete pavement shall be cold milled, crushed and screened to conform to the following gradation before mixing with emulsified recycling agent:

Sieve Sizes Percentage RAP Passing
1-inch 100

Graded millings/reclaimed asphalt pavement (RAP) shall uniformly be incorporated into the recycled pavement mixture and oversized or deleterious material shall be disposed of.

Rubberized crack filler, pavement markers, loop wires, thermoplastic markers, fabric and other like materials that may be incorporated into the RAP as it is removed from the roadway shall be removed by the screening process. A minor amount of these residual materials that cannot be completely removed from the processed RAP may be incorporated into the recycled mix if the Contractor can demonstrate that those added materials will not adversely affect the performance of the recycled asphalt pavement. Any such materials retained in the mix shall be appropriately sized and blended so as not to adversely affect the appearance or strength of the recycled pavement.

The contract unit price paid per square foot of Asphalt Concrete Pavement Cold Mill shall include

12100-0001\2410807v5.doc City
of MB Form
TP-16

full compensation for, but not limited to, furnishing all labor, materials, tools, equipment, saw cutting, loading, hauling, recycling, providing recycling weight certification, reports, and incidentals, for doing all work involved in asphalt c oncrete removal and recycling, and no additional compensation will be allowed therefor. If the Contractor does not provide the weight certification of recycling and the required monthly Solid Waste Disposal and Recycling Reports, then payment will be withheld until the weight certification and reports are provided.

FUNISH AND INSTALL ASPHALT CONCRETE 2 INCHES OVERLEY TYPE III C3-PG64-10 AC

PAVEMENT

Asphalt concrete (AC) shall meet the requirements of Section 400 of the Standard Specifications and these Technical Provisions:

Asphalt concrete shall be Type III-C3-PG64-10 for surface course or as specified herein.

Delete Item 3, "Crushed Slag," of Subsection 400 -1.2, "Asphalt Concrete Aggregates," of the Standard Specifications. The use of slag aggregate for asphalt concrete is expressly prohibited.

The individual test result requirements shall be as specified in Subsection 400 -4.3, "Combined Aggregates" of the Standard Specifications:

Add to Subsection 302-5.1, "General," of the Standard Specifications, the following:

The combined aggregate grading for asphalt concrete placed on miscellaneous areas shall conform to the gradation for the asphalt concrete placed on the traveled way, unless otherwise directed by the Engineer. The amount of asphalt binder used in the asphalt concrete placed in dikes, gutters, gutter flares, oversize drains and aprons at the ends of drainage structures, unless otherwise directed by the Engineer, shall be increased one per cent (1%) by weight of the aggregate over the amount of asphalt binder used in the asphalt concrete placed on the traveled way.

The asphalt concrete to be placed in areas which are designated by the City Engineer as miscellaneous areas may be spread in one layer. The material shall be compacted to the required lines, grades and cross section. Miscellaneous replacement areas shall be placed on subgrade which has been compacted to 95% relative compaction.

Replace the second paragraph of Subsection 302 -5.4, "Tack Coat," of the Standard Specifications, with the following:

A similar tack coat shall be applied to all surfaces that are to be overlaid unless otherwise directed by the Engineer.

All joints shall be sealed after rolling.

When placing asphalt concrete to the lines and grades as approved by the Engineer, the automatic screed controls shall control the longitudinal grade and transverse slope of the screed.

Grade and slope references shall be furnished, installed, and maintained by the Contractor. The Contractor shall use a ski device, the minimum length of the ski device shall be 30 feet. The ski

12100-0001\2410807v5.doc City
of MB Form
TP-17

device shall be a rigid one-piece unit and the entire length shall be utilized in activating the sensor.

The Contractor may use a laser to control the screed.

When placing the initial mat of asphalt c oncrete on existing pavement, the end of the screed nearest the center line shall be controlled by a sensor activated by a ski device not less than 30 feet long. The end of the screed farthest from center line shall be controlled by an automatic transverse slope device set to reproduce the cross slope approved by the Engineer.

When paving contiguously with previously placed mats, the end of the screed adjacent to the previously placed mat shall be controlled by a sensor that responds to the grade of the previously placed mat and will reproduce the grade in the new mat within a 0.01 feet tolerance. The end of the screed farthest from the previously placed mat shall be controlled in the same manner as when placing the initial mat.

Add to Subsection 302-5.6.1, "General (Rolling)," of the Standard Specifications, the following:

The Contractor shall furnish a sufficient number of rollers to obtain the specified compaction and surface finish required by the Standard Specifications and these Special Provisions.

Pneumatic rollers shall be required on lower layer only.

Initial breakdown compaction shall consist of a minimum of three (3) coverages of a layer of asphalt mixture. A pass shall be a movement of rolling in both directions over the same path. Coverage shall consist of as many passes as are necessary to cover the entire width being paved. Overlap between passes during coverage, made to ensure compaction without displacement of material in accordance with good rolling practice, shall be considered to be part of the coverage being made and not part of a subsequent coverage.

Each coverage shall be completed before subsequent coverages are started.

Add to the first paragraph of Subsection 302 -5.6.2, "Density and Smoothness," of the Standard Specifications, the following:

The completed surfacing shall be thoroughly compacted, smooth and free from ruts, humps, depressions or irregularities. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete shall be eliminat ed by rolling or other means. The use of any equipment that leaves humps, ridges, irregularities, indentations or other objectionable marks in the asphalt concrete shall be discontinued, and acceptable equipment shall be furnished by the Contractor.

The transverse slope of the finished surface shall be uniform to a degree such that no depressions greater than 0.01 feet are present when tested with a straightedge 10 feet long, laid in a direction transverse to the center line.

If the test results for any lot of asphalt concrete indicate that the relative compaction is below 95.0 percent (95%), the Contractor will be advised that he is not attaining the required relative compaction and that his materials, procedures, or both, need

12100-0001\2410807v5.doc City
of MB Form
TP-18

adjustment. Asphalt concr ete spreading operations shall not continue until the Contractor has notified the Engineer of the adjustment that will be made in order to meet the required compaction.

Replace the third paragraph of Subsection 302 -5.8, "Manholes," of the Standard Specifications, with the following:

Manholes, water valve and survey monument covers shall be adjusted to grade in accordance with the plans, and Subsection 301 -1.6, "Adjustment of Manhole Frame and Cover Set to Grade," of the Standard Specifications.

After the pavement has been completed, the necessary portions of the sub-grade, base, and pavement shall be neatly removed, the structure built up, and the manhole frame set to be backfilled with Type III -C3-PG64-10 asphalt concrete.

The asphalt concrete shall be placed and compacted in a workmanlike manner to conform to the appearance of the surrounding pavement, within two days of raising the manhole to grade.

All new and/or existing valve and survey monument covers shall be adjusted to grade during paving. When required, the Contractor shall install survey monument covers before paving. The Contractor shall furnish all slip sleeves or cans where none exist. The Contractor shall loosen and paint blue all water valve covers immediately after paving.

During as phalt concrete paving operations, it shall be the Contractor’s responsibility to place protective covering over, or to otherwise avoid paving over survey markers, monuments, and benchmarks, and to remove the covering and/or asphalt concrete after paving op erations have been completed.

The unit price paid per ton of Type III C3-PG64-10 Asphalt Concrete Pavement shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in constr ucting asphalt concrete complete in place, and no additional compensation will be allowed therefor.

FUNISH AND INSTALL TRAFFIC SIGNAL LOOP DETECTORS TYPE “D” AND “E”

Furnish and install traffic signal loop detectors per Caltrans Standard Specification Section 86 – Division X Electrical Work and Caltrans standard drawing ES-5B latest edition.

The Contractor shall test each Type D detector with a bicycle wheel made of ferromagnetic material, weighing not more than three pounds exclusive of tire and inner tube. If a frame is used to hold the wheel upright, it shall be made of a non -ferromagnetic material such as wood. Special features, components, or vehicles designed to activate the detector will not be permitted. The Contractor shall place or hold the wheel vertically over each Type D detector. The loop detector must register and hold the presence of the bicycle wheel for a continuous period of time of at least two minutes in order to for the Engineer to accept the detector test and installation.

12100-0001\2410807v5.doc City
of MB Form
TP-19

The Contractor shall test each Type E detector with a motor driven cycle, as defined in the California Vehicle Code that is licensed for street use by the Department of Motor Vehicles of the State of California. The unladen weight of the vehicle shall not exceed 220 pounds and the engine displacement shall not exceed 100 cubic centimeters. Special features, components or vehicles designed to activate the detector will not be permitted.

The Contractor shall provide an operator licensed to drive such vehicle who shall drive the motor driven cycle through the response or detection area of the detector at not less than 3mph nor more than 7 mph. The loop detector must detect the motor driven vehicle without the call being held in order for the Engineer to acc ept the detection test and installation.

The Contract unit price paid per each traffic signal loop installed shall include, but not be limited to the complete installation of the loop detectors, to the termination of pull box, conduits, slot cutting, lead-in cable loop wire, and application of sealant. The price shall Include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, as directed by the Engineer, and all other appurtenant as shown on the plans and per the specifications, and no additional compensation will be made therefor.

PROTECT AND ADJUST SURVEY MONUMENT FRAMES, COVERS, AND SLEEVES

Existing survey markers, monuments, and benchmarks shall be protected in place. Monument frames, covers, and sleeves shall be furnished and adjusted to finished grade.

Existing survey markers, monuments, and benchmarks not conforming to the proposed roadway finish surface shall remain accessible by means of an approved sleeve and lid per City of Manhattan Beach Standard D rawing MBSI-170A-0 ST-4, or by other methods approved by the Engineer. Contractor to complete and submit the Monument Inventory List in Appendix V within 2 weeks of receiving the City’s location list.

The Contract unit price paid per each for adjusting monument frames, covers, and sleeves to finished grade shall be measured in accordance with “Monument Preservation, Restoration and Survey” Bid Item, per Standard Specifications, and shall include full compensation for furnishing all labor, materials, tools, and equipment, record with the County Land Survey Records, and for doing all the work involved in adjusting monument frames, covers, and sleeves to finished grade, complete in place, and no additional compensation will be allowed therefor.

12100-0001\2410807v5.doc City of MB Form Appendix

APPENDIX I

PROGRESS PAYMENT REQUEST FORM
TO: CITY OF MANHATTAN BEACH
Engineering Division, 1400 Highland Avenue, Manhattan Beach, CA 90266 PROJECT TITLE __________________________________________________________________________________________ PROJECT NO. __________________________________________________________________________________________ FROM: CONTRACTOR _________________________________________________________ Date _________________________ Address __________________________________________________________________________________________ Telephone ____________________________________ Progress Estimate # ________________________________ Submitted by ____________________________________ Contract Award Amount $_______________________________ No. Description Contract
Quantity
Previous
Quantity
Quantity This
Estimate
Unit
Price
Amount
This
Estimate
Total Quantity
to Date
Total Amount
to Date

1. 2.

3. 4.

5. 6.

7. 8.

9. 10.

11. 12.

13. 14.

Total
Less Retention
Less Previous Billing(s)
Total Amount Due

City Approval: ______________________________________ Date: __________________________________________ NOTE: An updated Project Schedule must be provided with each monthly progress payment in accordance with Section 6 -1 of the General Provisions in addition to a Conditional Waiver and Release form per Section 9 -3.2.1

12100-0001\2410807v5.doc City of MB Form Appendix

APPENDIX II

CONTRACTOR’S DAILY REPORT TO THE CITY
(Only the Contractor’s Foreman and Superintendent is authorized to complete this form.) Project Name: _________________________ Project Location: _______________________________ Date: ___________ Report No.: ____________ Start Time: ____________ End Time: _____________ Contractor’s Company Name: ___________________________________________________________

Contractor’s Foreman/Superintendent: ____________________ ____________________________ Name Signature
Work Accomplished

Equipment on Site Hours

Workers on Site Classification Hours Company

Note: It is the responsibility of the Contractor to provide this completed form to the City every working day by 5:30 PM, without fail. Failure to do so may result in the corresponding monthly progress payment to be delayed.

12100-0001\2410807v5.doc City of
MB Form
Appendix III

APPENDIX III

APPLICABLE CITY STANDARD PLANS

1. Manhattan Beach Vicinity Map

2. Manhattan Beach Standard Plans
 MBSI-110A-1(ST-1) Residential Driveway Approach (R/W width behind curb 8” or more)  MBSI-110B-1(ST-1) Residential Driveway Approach (R/W width behind curb 10” or more)
 MBSI-110C-1 (ST-1) Residential Driveway Approach (For confined right-of-way)  MBSI-111A-0 (ST-9) Curb Ramp – Not Currently in Use (Please refer to latest Caltrans Standard A88 or Greenbook Standard Plan 111 for Curb Ramps)  MBSI-112A-0 (ST-2) Standard Sidewalk
 MBSI-115D-0 Sidewalk Placement Around Obstructions
 MBSI-116A-0 Commercial Driveway Approach: Type I
 MBSI-116B-0 Commercial Driveway Approach: Type II
 MBSI-116C-0 Commercial Driveway Approach: Type III
 MBSI-116D-0 Commercial Driveway Approach: Type IV
 MBSI-120A-0 (ST-3) Standard Curb and Gutter
 MBSI-121A-0 Type C Rolled Curb
 MBSI-122A-0 (ST-12) Standard Cross Gutter
 MBSI-123A-0 Pervious Concrete Gutter
 MBSI-133A-0 Concrete Pavement Replacement
 MBSS-210A-0 (ST-19) 24” Sewer Manhole Frame and Cover  MBFE-312A-0 (ST-7) Manhole Frame and Cover for Catch Basin

3. Armorcarst Product Company Drawings
 A6001921X12, A6001922T-9X, A6001922, A6001922T, A6001922SMT, A6000485, A600048T, A6001946PCX12, A6001866, A6001969, A6001419, A6001420T, A6001640PCX12, A6001643, A6001947T.

4. Caltrans Standard Plans
 ES-5B

12100-0001\2410807v5.doc City of
MB Form
Appendix IV

APPENDIX IV

ADA CURB RAMP AND DRIVEWAY COMPLIANCE MEMORANDUM - TEMPLATE

12100-0001\2410807v5.doc City of
MB Form
Appendix IV

MEMORANDUM

DATE: xxxxxx, xx 2021

TO: PREM KUMAR, PE, CITY ENGINEER

FROM:

SUBJECT: CURB RAMPS CONSTRUCTION PROJECT – “AS-BUILT” MEMO WITH

CERTIFICATE OF COMPLIANCE

PROJECT NUMBER

RAMP LOCATION -

The installation of Americans with Disabilities Act (ADA) curb ramps followed the Caltrans latest Revised Standard Plan RSP A88A, City of Manhattan Beach Standard Curb Ramp Removal Limits, Sheet D and Sheet E. Normal circumstances allow application of the design parameters of the standard plans without deviation from the printed standard plans.

Several items can impact the design parameters of the standard plans which are street slopes, site conditions and other factors. For this ramp location, the following Items describe their impacts of deviations from the standard plans.

Item 1 – Street Slopes

The above referenced project is located in the City of Manhattan Beach, in several hillside neighborhoods that have street slopes greater than 5%. It was mutually agreed upon and determined to use the Standard Plans for Public Works Construction, Standard Plan 111-5, Sheet 9 of 10, Table 2, Slope Adjustments to address the ramp conditions with street slopes in excess of 5%. . In order to address street slope values larger than the 5%, engineering judgement, site conditions, constructability and ADA compliance are factored into the following recommended implementation methodology for constructing ADA compliant ramps.

For streets with a slope greater than 5%, application of the Street Slope Adjustment shall be as follows;

“X” Up Dimension shall the End of Curb Return (EC). This complies with City of Manhattan Beach Standard Curb Ramp Removal Limits, Sheet D and Sheet E.

All other standards identified in the Standard Plans shall be implemented to the greatest extent practicle during construction as applicable.

This recommendation provides compliance with the intent of the ADA Curb Ramp Standards and a provides a logical termination for the ramp construction where the street slope exceeds 5%.

Item 2 – Site Conditions

The street slopes for the site are as follows:

Chestnut slopes away from the Ramp at 1.4% and 21St slopes down and away at 7.5%

12100-0001\2410807v5.doc City of
MB Form
Appendix IV

The street slope is in excess of the 5% on the 21St side and the slopes are shown accordingly. This allowed a ramp slope of 7.5% or less, the gutter plate slope less than 5% and the sidewalk ramp slope of .8% along Chestnut are in compliance with the standard. The sidewalk ramp slope along Chestnut is in excess of the standard due to the transition from the flat intersection to the downhill slope of 7.5%. The as-built field conditions and actual slopes provides compliance with the intent of the ADA Curb Ramp Standards and a logical termination to address the site conditions.

Item 3 – Other Factors

One additional factor that was accommodated for was joining the sidewalk elevation with the private property walkway. The elevations matched and a step was not required.

These as-built field conditions provides compliance with the intent of the ADA Curb Ramp Standards and to address other factors.

Conclusion:

The street slopes, site conditions and other factors contribute to the constructed ramp meeting the intent of the ADA Curb Ramp Standard by allowing access from the sidewalk to the roadway and that are not in compliance with maximum slope values noted on the standard plans due to the documents items.

Certificate of Compliance:

This Certificate of Compliance is prepared after completion of construction activities for the Ramp located at xxxxxxxxxxxxxxxxxxxxx, that created, altered, or affected pedestrian facilities constructed in accordance with the policies, standards and project specifications in compliance with the intent of the standards of the ADA.

I, (Project Engineer), a California Licensed Professional Engineer do hereby certify that the project has been constructed in accordance with the project specifications, standard plans, “As- Built” Memorandum describing construction exceptions due to the individual site conditions.

[ Engineer’s Stamp]

Project Engineer,
No. C xxxxx, Exp Date

12100-0001\2410807v5.doc City of
MB Form
Appendix V

Appendix V

MONUMENT PRESERVATION AND RESTORATION
Monument Inventory List

Project Name and Number: Citywide Concrete Repairs FY21-22 P-920 Date:

Contractor’s Licensed Surveyor shall review the project limits in order to locate existing monuments, centerline ties and other monuments observed. Surveyor shall prepare an inventory of monuments found, approximate location, monument character and whether it will be destroyed during construction.

Contractor shall provide the City with the i nventory list two weeks after receiving the location list .

Contractor will be required to file a record of survey to re-stablish all damage monuments.

No. Location Monument Type Impacted by
Construction Yes (Y)
or No (N)