Hourly Rate
$245
$215
$200
$195
$175
Instrumentation & Controls Specialist $150
FEE PROPOSAL $150
PROJECT WORKSHEET $120
Sr. CAD Designer $130
Project Data CAD Designer/GIS Analyst $100
Project Name: Larsson Street & 2nd Street Pump Station (Change Order #1) Graphic Designer $100
Client: City of Manhattan Beach Proj. Coordinator/Admin. Support $80 PACE Job Number: B438 Assistant Designer $80
Estimate Date: September 18, 2019 G.P.S. Survey Unit (w/Operator) $240 Expert Witness/Legal Consultation $350 + Exp. $149,810
6 Final Design Services
6.1 Proj ect Management 6 6 6 $3,120 $3,120
6.2 Electrical Service Relocation & Upsizing Concept from 100A to 200A 1 6 3 2 6 8 2 $4,240 $4,240
6.3 Assist City as Agent with SCE Service Application 4 24 8 8 16 6 $10,620 $10,620
6.4 Pre-purchase Arrow Engine and Goulds Pump Specifications for City 3 4 4 16 8 4 8 $6,375 $6,375
6.5 Preliminary New Engine Noise Dampening Concept 2 4 4 8 2 $2,650 $1,500 $4,150
6.6 Preliminary Hatch Expansion Concept 4 4 4 8 2 $3,040 $4,500 $7,540
6.7 Survey to Establish Grade for Top of New Access Hatch 2 3 4 3 $1,960 $1,960
6.8 Assist with Outreach with Adjacent Commercial Property Owner and Field Observation of Existing Pump Operating
Condition 3 3 3 4 $2,245 $2,245
6.9 Geotechnical Boring and Report 2 4 4 2 2 68 $15,830 $15,830
6.1 Project Design Coordination Meetings 5 5 5 $2,950 $2,950
6.11 50% Design Drawings 4 8 12 12 12 16 12 60 8 8 30 $22,620 $6,000 $28,620
6.12 90% Traffic Control Plans 4 4 4 8 16 2 $5,420 $14,000 $19,420
6.13 90% Design Drawings, Specifications & Engineer's Estimate 2 4 6 6 6 8 6 30 4 8 16 $11,710 $3,000 $14,710
6.14 Final 100% Traffic Control Plans 2 2 2 2 8 2 $2,490 $7,000 $9,490
6.15 Final 100% Design Drawings, Specifications & Engineer's Estimate 2 2 4 4 4 4 2 16 4 8 $6,390 $6,390
6.16 Combine 2nd Street with Larsson Street Pump Station Bid Package #2 2 4 4 4 6 20 8 16 $7,590 $7,590
SUBTOTAL TASK 6 40 0 48 73 49 22 94 0 20 208 12 56 78 3 0 68 $109,250 $36,000 $145,250 2nd Street PS & Larsson Street PS
7 Pre-Bid and Bid Services 0
7.1 Pre-Bid and Bid Services 0 8 20 $4,560 $4,560
SUBTOTOL TASK 7 0 0 0 8 0 0 20 0 0 0 0 0 0 0 0 0 $4,560 $0 $4,560 40 0 48 81 49 22 114 0 20 208 12 56 78 3 0 68 $113,810 $36,000 $149,810 2019 PACE Hourly Rate Schedule
Description
Principal
Sr. Electrical Engineer / Sr. GIS Analyst
Project Manager /Consulting Engr.
Sr. Proj. Engr./Sr. Design Engr.
Sr. Proj. Mgr./Sr. Consulting Engr.
Sr. Project
Engineer/Sr.
Design Engr.
Reimburs.
Expenses
Geotechnical
Engineering
Sub
CAD
Designer
/GIS
Analyst
Design
Engineer
Man-Power
Subtotal
Proj.
Coord/Admin
Support
Structural
EngineerPrincipal
Project
Engineer
/Design
Engr. II
Proj. Engr/Design Engineer II
Design Engineer
Total Fee Amount for 2nd Street Pump Station:
Sr. Electrical
Engineer/Sr.
GIS Analyst
Estimated Manhours
Project Mgr./
Consulting
Engr.
Sr. CAD
Designer
TOTAL INLCUDING PRE-BID AND BID SERVICES TASK
Sr. Project
Manager/Sr.
Consulting Engr.
Inst. &
Controls
Specialist
Assistant
Designer
Graphic
Designer
Total Task
CostsItem No.
GPS Survey
Unit
(w/Operator)Work Item Description
-8-