“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral
staff presentation of an agenda report topic.
In the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
PROPOSED 5 -YEAR CAPITAL
IMPROVEMENT PROGRAM
FY 2023/24 -2027/28
MAY 2, 2023
Erick Lee, Public Works Director
Katherine Doherty, P.E., ENV SP, City Engineer
2CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
April 26, 2023 Proposed CIP Presented to Planning Commission April 27, 2023 Proposed CIP Presented to PPIC
May 2, 2023 Proposed CIP Presented to City Council
Recommended Actions:
Approve the Proposed 5-Year CIP Project List
84 Projects
5 Year Funding Plan of $160,442,946
June 6, 2023 CIP Adoption by City Council
5-YEAR CIP APPROVAL TIMELINE
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
3CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
COMPLETED PROJECTS IN FY 22/23
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
1. Sepulveda Bridge Widening Project
2. Polliwog Lower Playground Replacement
Project
3. Manhattan Village Senior Villas ADA Pathway
Project
4. Biennial Slurry Seal Project in the North Sand
Section
5. Sand Dune Park Restoration Project
6. Annual Water Infrastructure Improvements
Project – Cycle 1
7. City Hall HVAC Project – Phase 1
8. Annual Concrete Repairs Project – Cycle 1
9. Parking Structure Lot 3 Seismic Analysis
Update
10. Water Reservoir and Begg Field
Improvements as part of the Peck Reservoir
Replacement Project
11. Automated Water Meter Installations Project
12. Annual Sewer Infrastructure Improvements
Project – Cycle 2
13. Utility Undergrounding Assessment District 4
4CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
Streets
Other ROW
Parks Stormwater
Buildings Wastewater
Water
Studies & Evaluations
CIP
PROGRAMCIP
PROGRAM
5CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
5-YEAR CIP SNAPSHOT
FY2023/24 – FY2027/28
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
$49,345,135
Previously Appropriated
$49,187,811
FY 2023/24 Request
$61,910,000
Future Appropriations
(Fiscal Years 2-5)
TOTAL Proposed 5 -Year
CIP
84 Projects
$160,442,946
6CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
FUNDING SOURCES
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
CIP FUND ENTERPRISE
FUNDS
LOCAL RETURN, SPECIAL FUNDS
AND GRANTS
TOT Water Prop C State Grants
Parking Citations Wastewater Measure R South Bay Hwy Prog .
City Parking Meters Stormwater Measure M Metro Call for Proj.
Grants & Trust Funds Gas Tax Federal Grants
Construction Bond Street Lighting Fund
Parking Lot Fund
State Pier & Lot
Fund
$20,839,500 $90,788,549 $48,814,897
7CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
CIP FUNDS
TOT, Parking Citations, Parking
Meters, Grants, Special Funds
Building and park facility
repairs/improvements, master
plans, streetscape, traffic
signals, pedestrian access, bike
lanes, Veterans Parkway
30 Projects
$20,839,500
8CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
CIP FUNDS PROPOSED PROJECTS
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
1. Electric Vehicle Chargers at Marine Park
2. Police Facility Flooring Replacement
3. Deferred Park Maintenance
4. Marine Ave. Park Field Turf Replacement
5. Manhattan Heights Restroom Renovation
6. Gateway/Monument Sign Replacement
7. Renovation of Employee Lounge at City
Hall
8. Way Finding Program (Phase 2)
9. Aquatic Center – Feasibility
10. Mariposa Fitness Station Equipment
Replacement
11. Annual ADA Improvements
12. City Council Chambers Renovations –
Feasibility
13. Sepulveda/Oak Traffic Calming
14. Annual Non-Motorized Transp. Program
15. City-Owned Refuse Enclosures Imp.
16. School District Project
17. Begg Field Improvements
18. Sand Dune Park Improvements
19. Solar Power Installation at City Facilities
20.Park Imp. Program
21. Annual Facility Improvements
22. Polliwog Band Stage
23. City Hall HVAC Replacement
24. NFC Equipment Installation
25. Senior & Scout Community Center
26. Ceramic Studio Upgrade
27. City Hall Renovations
28. Security Cameras for City Facilities
29. Biennial Slurry Seal – MBUSD
30. Fire Station No. 2
9CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
STREET, SIDEWALKS, ROW FUNDS
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
19 Projects
$43,633,635 Slurry seal, street resurfacing,
intersection improvements,
capacity enhancements, studies,
ADA access improvements,
sidewalks
Gas Tax, SB1, Prop C, Measure
R Local Return, Measure M
Local Return, Grants (Metro,
SBHP, HSIP)
10 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
STREETS, SIDEWALKS, ROW
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
1. Ocean Dr. Walk Street Crossings
2. Annual Citywide Concrete Repair
3. MBB Pavement Rehab (Sepulveda
to Dianthus)
4. Annual Street Resurfacing
5. Biennial Slurry Seal
6. Triennial Pavement Mgmt. System
Report
7. MBB and Pacific Int. Improvements
8. MBB Complete Streets Corridor
Study
9. Annual Citywide Traffic Signal
Replacements
10. ADA Transition Plan
11. Rowell Ave. Sidewalk Gap Closure
12. MBB and Aviation Eastbound Left-
Turn Improvements
13. MBATS
14. Rosecrans Bike Lane Impr.
15. Sidewalk – Aviation/33rd
16. MBB and Peck Signal Upgrade
17. Joslyn Center Crosswalks
18. Sepulveda/Cedar/Marine Signal
19. Dual left MBB at Sepulveda
11 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
PARKING FUND
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
2 Projects
$2,474,778
Maintenance, repair, and
rehabilitation of City-owned
parking lots and surrounding
landscape areas
1. Way Finding Program (Phase 1)
2. Parking Structure Lot 3 Replacement* – Feasibility/D esign 12 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
STATE PIER & LOT FUND
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
2 Projects
$2,241,496
Maintenance and repair of the State-
owned pier and parking lots
1. Pier Structural Inspection Update
2. Pier Railing Replacement
13 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
STORMWATER FUNDS
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
Storm drain improvements,
storm water conveyance
upgrades, NPDES compliance
9 Projects
$37,534,922
14 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
STORMWATER FUNDS
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
1. Peck Ave. Storm Drain
Improvements
2. TMDL Trash Treatment
3. Shelley Street Improvements
4. 28 th Street Stormwater Infiltration
5. Beach Cities Green Streets
6. CCTV Storm Drain System
7. Golf Course Storm Drain Lift
Station Electrical Upgrades
8. Annual Storm Drain Repairs
9. Annual Storm Drain Capital BMPs
15 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
STREET LIGHT & LANDSCAPE FUND
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
1 Project
$464,988
Maintenance and replacement
of City-owned street lights
1. Annual Street Light Replacements
16 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
WASTEWATER FUND
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
8 Projects
$25,117,980
Sewer main replacement, pump
station upgrades, improved
telemetry, force main replacements
Pump Station
Wet Well with
Submersible
Pumps
Pump Station
Dry Well
17 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
WASTEWATER FUND
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
1. Wastewater Master Plan Update
2. Annual Pipe Replacement
3. Bell Ave. Lift Station Upgrade
4. Palm Lift Station
Replacement/Upgrade
5. Meadows Lift Station
Replacement/Upgrade
6. Voorhees Lift Station Upgrade
7. Pacific Lift Station Replacement
(Gravity Sewer)
8. Poinsettia Lift Station Upgrade
18 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
WATER FUND
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
13 Projects
$28,135,647
Water main replacement,
reservoir upgrades, elevated tank
painting, meter upgrades, well
rehab and improved treatment
processes
19 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
WATER FUND
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
1. Electronic Automation (SCADA)
2. Generator Upgrades
3. El Porto Water Infrastructure
Improvements (Phase 1)
4. El Porto Water Infrastructure
Improvements (Phase 2)
5. Water Master Plan Update
6. Well Line Replacement on MBB
7. Duncan/Sepulveda Fire Flow
Improvements
8. Block 35 Reservoir Replacement
9. Block 35 Elevated Tank Improvement
10. Water Meter Upgrade
11. Larsson St. & 2 nd St Booster Stn.
12. Peck Reservoir Replacement
13. Annual Pipe Replacement
20 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
8 CIP FUNDING CATEGORIES
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
TOTAL
$160,442,946
Street Lighting &
Landscape
$464,988
Streets, Sidewalks,
& ROW
$43,633,635
CIP
$20,839,500
Water
$28,135,647
Stormwater
$37,534,922
Wastewater
$25,117,980
Parking
$2,474,778
State Pier & Lot
$2,241,496
21 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
CITY MAP OF CAPITAL PROJECTS
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
22 CITY OF
MANHATTAN BEACH
“Note: This PowerPoint presentation is
intended solely as a visual aid to an oral staff
presentation of an agenda report topic. In
the event of any differences between the
presentation and the agenda report, the
information in the agenda report prevails.”
STAFF RECOMMENDATION
PROPOSED 5-YEAR CAPITAL IMPROVEMENT
PROGRAM
MAY 2, 2023
Staff recommends that City Council receive a
presentation on the Proposed 5-Year Capital
Improvement Program (CIP) Plan for FY2023-2024
through FY2027-2028 and:
1. Review the Proposed 5-Year CIP projects listed in t he attachments; and
2. Direct staff to revise the 5-Year CIP based on any
changes or modifications requested by City Council;
or
3. Approve the 5-Year CIP projects list as presented.