City of Manhattan Beach
City of Manhattan Beach | Capital Improvement Program, FY2025-2029 Bruce Moe, Cit y Manager
Erick
Lee, Director of Public Works
Katherine Doherty, Cit y Engineer
PROPOSED
FY 2024-2025 THROUGH 2028-2029
CAPITAL IMPROVEMENT
PROGRAM
Page No.
Introduction 6
City Manager's Introduction 7
Acknowledgements 8
Reader's Guide 9
Capital Improvements 13
Capital Improvements: One-year Plan 14
Capital Improvements: Multi-year Plan 15
Schedule of Capital Improvement Projects by Fund 16
Schedule of Capital Improvement Projects by Fund 17
Project Summary Sheets by Fund
AB 2766 Air Quality Fund 21
Electric Vehicle Chargers at Marine Ave Park 22
CIP Fund 23
Annual Park Improvements/Replacement Program - Playground Equipment 24 Annual Park Improvements/Replacement Program - Sport Courts 25 Annual Park Improvements/Replacement Program - All Other 26 Sand Dune Park Improvements 27
Sports Court at Marine Avenue Park - Pay N Play (Partial Measure A) 28 Replace Fencing at Marine Avenue Park Soccer Field 29
Begg Facility Parking Lot Resurfacing 30
Replace Light Controllers at Manhattan Village Field 31 City Facility Renovations 32
City Council Chambers Renovations - Feasibility 33
Police Facility Flooring Replacement 34
Deferred Parks Maintenance 35
Gateway and Monument Sign Replacement 36
Wayfinding Program - Phase 2 37
Aquatic Center - Feasibility/Design 38
Sepulveda/Oak Neighborhood Traffic Calming (MV Mall) 39 Annual Non-Motorized Transport. Program (Bike lanes, crosswalks) 40 City Owned Refuse Enclosures Improvements 41
School District Project 42
Solar Power Installation at City Facilities 43
Annual Facilities Capital Maintenance Program 44
City Hall Elevators Modernization 45
Irrigation for Tree Wells in North Manhattan Beach 46
Upgrade Main Electrical Feed to Public Works Yard 47
Mariposa Fitness Station Parcourse Equipment Replacement 48 Manhattan Heights Park Restroom Rehab and Artificial Turf Installation 49 City Hall HVAC Replacement 50
Senior and Scout House Community Center Renovation 51
City of Manhattan Beach
Capital Improvement Plan FY2025-2029
Table
of Contents
City of Manhattan Beach | Capital Improvement Program, FY2025-2029
City of Manhattan Beach
Capital Improvement Plan FY2025-2029
Table of Contents
Page No.
Annual Citywide Security Cameras Program 52
Biennial Slurry Seal Program - MBUSD 53
Gas Tax Fund 54
Annual Street Resurfacing Program 55
Triennial Pavement Management System Update 56
Ocean Drive Walk Street Crossing 57
Annual Citywide Concrete Repair Program 58
Biennial Slurry Seal Program 59
Measure M Fund 60
Annual Street Resurfacing Program 61
Annual Citywide Traffic Signal Replacements 62
Manhattan Beach Advanced Traffic Signal (MBATS) System 63 MBB and Pacific Ave Improvements 64
ADA Transition Plan within Public Rights of Way 65
MBB Eastbound Left-Turn Improvement at Aviation Blvd. (Measure M) 66 Measure R Fund 67
Annual Street Resurfacing Program 68
Artesia & Aviation SB Right-Turn Improvement 69
Rosecrans Bike Lane Improvements (Partial Grant CPF) 70 MBB Pavement Rehabilitation from Sepulveda Blvd. to Dianthus St. 71 Aviation Blvd and 33rd Missing Sidewalk (Partial Grant 5310) 72 Prop C Fund 73
Annual Street Resurfacing Program 74
MBB and Sepulveda Intersection Improvements 75
Parking Fund 76
Paint Metlox Parking Structure 77
Annual Parking Payment Facilities Improvements Program 78 Annual Parking Facilities Capital Improvements Program 79 Wayfinding Program - Phase 1 80
Waterproofing City Hall and Police/Fire Parking Structures 81 Parking Structure Lot 3 Replacement*-Feasibility/Design8 2 Redesign and Repurpose of Metlox Slab Fountain Area 83
Replace Escalators in Metlox Plaza (Cost Share) 84
Biennial Slurry Seal Program 85
State Pier and Lot Fund 86
Pier Structural Inspection Update 87
Pier Railing Replacement 88
Grants and Other Outside Funds 89
Sports Court at Marine Avenue Park - Pay N Play (Partial Measure A) 90 MBB Complete Streets Corridor - Feasibility/Design (Measure M) 91 City of Manhattan Beach | Capital Improvement Program, FY2025-2029
City of Manhattan Beach
Capital Improvement Plan FY2025-2029
Table of Contents
Page No.
Highland Corridor Complete Streets Design (Measure M) 92 Annual ADA Improvements Program (CDBG) 93
El Porto Water Infrastructure Improvements - Phase 1 (Partial CPF) 94 Peck Avenue Storm Drain Improvements (Partial Grant CPF) 95 Rosecrans Bike Lane Improvements (Partial Grant CPF) 96 Replace Escalators in Metlox Plaza (Cost Share) 97
Intersection Improvements Project (Cycle 11 HSIP) 98
Measure W Fund 99
TMDL Trash Treatment 100
Shelley Street Storm Drain Improvements 101
Beach Cities Green Streets Stormwater Infiltration 102
28th Street Stormwater Infiltration 103
Storm Drain Fund 104
CCTV Storm Drain System 105
Manhattan Beach Dominguez Channel Stormwater Infiltration - Feasibility 106 Golf Course Storm Drain Lift Station Electrical Upgrades 107 Beach Cities Green Streets Stormwater Infiltration 108
Peck Avenue Storm Drain Improvements (Partial Grant CPF) 109 Shelley Street Storm Drain Improvements 110
Annual Storm Drain Repairs 111
Storm Drain Capital Best Management Practices (BMPs) 112 TMDL Trash Treatment 113
Street Lighting and Landscape Fund 114
Annual Streetlight Replacement Program 115
Sewer Fund 116
Sewer Lift Stations PLC Upgrades 117
Sewer Master Plan Update 118
Annual Rehabilitation of Gravity Sewer Mains 119
Bell Lift Station Upgrade 120
Palm Lift Station Upgrade 121
Meadows Lift Station Upgrade 122
Voorhees Lift Station Upgrade 123
Pacific Lift Station Replacement (Gravity Sewer) 124
Poinsettia Ave Sewer Lift Station and Force Main Replacement 125 Water Fund 126
Recycled Water Feasibility Study and MBB Medians 127
Larsson Street Booster Station Improvements 128
Water Lift Station PLC Upgrades 129
Electronics Automation - SCADA, etc. 130
Generator Upgrades - Well 15 and Block 35 131
Block 35 Ground Level Reservoir Replacement 132
Block 35 Elevated Tank Improvements 133
City of Manhattan Beach | Capital Improvement Program, FY2025-2029
City of Manhattan Beach
Capital Improvement Plan FY2025-2029
Table of Contents
Page No.
Water Meter Upgrade and Automation 134
Water Master Plan Update 135
Annual Groundwater Wells Capital Maintenance Program 136 El Porto Water Infrastructure Improvements - Phase 2 137 Duncan Drive and Sepulveda Blvd Fire Flow Improvements 138 El Porto Water Infrastructure Improvements - Phase 1 (Partial CPF) 139 2nd Street Booster Station Improvements 140
Annual Water Infrastructure Improvements 141
Glossary 142
City of Manhattan Beach | Capital Improvement Program, FY2025-2029
INTRODUCTION
City of Manhattan Beach | Capital Improvement Program, FY2025-2029
Transmittal Letter
Bruce Moe, City Manager
Honorable Mayor and Members of the City Council,
It is my pleasure to submit the City’s Capital Improvement Program (CIP) Plan for City Council consideration. The Plan covers a variety of projects for funding consideration in Fiscal Year (FY) 2025, as well as projects in outlying years, and provides for multi-year, systematic scheduling of public physical improvements based on community priorities, sound planning, and revenue projections. Effective CIP planning is essential for maintaining and improving vital infrastructure and for the proper stewardship of taxpayer dollars.
This Plan was developed with the overarching goals of improving infrastructure and public spaces to enhance public vitality, health, and safety, maintaining regulatory compliance, and promoting sustainability. It focuses on improving City security, continuing implementation of projects that ensure compliance with stormwater quality regulations, upgrades to parks and recreational facilities, improving infrastructure that supports maximizing utilization of the City’s groundwater supply, and continuing with citywide transportation improvements. Additionally, this Plan re ects the priorities outlined in the City Council Work Plan and those provided by residents during various community meetings.
The proposed 5-Year CIP includes 94 individual projects totaling $176,978,801. This includes projects already underway as well as those to be initiated within the next ve years. The planned expenditures are for projects approved in prior years, representing approximately $81.2 million, while the remaining $95.8 million represents projects planned for implementation in FY 2025 through FY 2029.
I want to thank City staff for their efforts in putting together this comprehensive plan. Special thanks to the Public Works and Finance Departments for their collaboration and diligence. Thank you also to the City Council for your continued leadership and investment in the City’s infrastructure to create a more livable, beautiful, and safe community for all Manhattan Beach residents.
Sincerely,
Bruce Moe
City Manager
City of Manhattan Beach | Capital Improvement Program, FY2025-2029
Acknowledgements
The FY 2025-2029 Capital Improvement Plan was prepared by an interdepartmental team whose members included:
Erick Lee, Public Works Director
Steve Charelian, Finance Director
Katherine Doherty, City Engineer
Julie Bondarchuk, Financial Controller
Libby Bretthauer, Financial Services Manager
Marcelo Serrano, Budget and Financial Analyst
Melanie Park, Administrative Assistant
Bonnie Shrewsbury, GIS Analyst
Erika King, Senior Management Analyst
The recommendations contained in this document represent our best analytical efforts and a shared organizational and community vision of Manhattan Beach’s capital needs for the next ve years.
City of Manhattan Beach | Capital Improvement Program, FY2025-2029
Reader's Guide
A Capital Improvement Program (CIP) is very important for planning and managing a city’s growth and development, as well as maintaining existing infrastructure. It implements some of the community’s goals and objectives and encourages discussion of the City’s long-range vision.
There are many factors involved in developing a Capital Improvement Program. In this section, answers to frequently asked questions are provided, such as:
What is a ve-year CIP?
What is the purpose of a ve-year CIP Plan?
How do I read a CIP Plan?
Who develops the CIP Plan?
Where does the money come from to pay for the CIP?
What is the general philosophy behind the funding decisions? Will the CIP have any impact on the Operating Budget?
Is there a policy behind a CIP Plan?
What is a ve-year Capital Improvement Program (CIP)?
A ve-year CIP is a planning document developed by the City that lists the proposed and scheduled projects and studies planned for the next ve scal years (July 1 – June 30). It is inclusive of the capital improvements, renovations, and new installations required in order to maintain the City’s buildings, parks, and rights-of-way infrastructure. Many of the projects proposed in the ve-year CIP are “public projects’’, which is de ned under the State of California Public Contracting Code as: