LOT 3 PARKING STRUCTURE UPDATE
JEFF FIJALKA, PRINCIPAL CIVIL ENGINEER
ERIK ZANDVLIET, CITY TRAFFIC ENGINEER OCTOBER 1, 2024
6/24/24 – Upper Level Closed
7/30/24 – Full Closure
9/3/24 – Local Emergency Declared
TIMELINE
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE
LOT 3 LOCAL EMERGENCY
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE
Full Demolition of Structure
Interim Parking Lot
Temporary Relocation of Farmer’s Market
Parking Alternatives
Additional spaces within walking distance of Downtown
Shuttle service for Special Events
BID RESULTS
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE
Eight contractors contacted and six bids received:
Contractor Total Bid Amount
American Wrecking, Inc. $ 190,000 Force Demolition, Inc. $ 341,820
Applied Restoration, Inc. (ARI) $ 418,000 AMPCO Contracting, Inc. $ 457,250 Integrated Demolition and Remediation, Inc. (IDR) $ 605,000 Leckey Land Clearing/Murakami $ 1,850,000 Note: The scope of work is for demolition only. Construction of an interim at-grade parking facility will be procured at a later time.
Perimeter Fencing
Center Place Modifications
Temporary Shoring
Lead and Asbestos Survey
Utility Disconnection
Resident Engineer
Topographical Survey
Demolition Contract
Interim Parking Lot Design
LOT 3 UPDATE
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE
DOWNTOWN Parking Modifications
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE
90 potential additional spaces
Valley Drive
15th Street
Manhattan Beach Boulevard
Morningside Drive
Bayview Drive
Manhattan Avenue
58 spaces currently being installed
32 spaces require removal of travel lane or bike lane (yellow)
VALET Parking service
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE
DOWNTOWN Resident permit Parking
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE
Options
Restore 2-hour time limit except by permit restrictions Restore 2-hour time limit except by permit restrictions, and allow Lot M Permittees to park Restore permit restrictions with 3-hour public time limit Maintain current unrestricted parking.
FARMER’S MARKET RELOCATION
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE
Two Candidate Locations
Manhattan Avenue-9th Street to MBB
Civic Center Public Lot and Civic Center Plaza
Staff recommends that the City Council:
Determine, by four-fifths vote, that there is a need to continue the emergency action; and Discuss and provide direction on the following:
Additional parking spaces in the Downtown area
Valet Parking Service
Downtown Residential Parking Permit Program
Farmer’s Market Relocation Alternatives
STAFF RECOMMENDATIONS
OCTOBER 1, 2024
LOT 3 PARKING STRUCTURE UPDATE