LOT 3 PARKING STRUCTURE
JEFF FIJALKA, PRINCIPAL CIVIL ENGINEER JANUARY 21, 2025
6/24/24 Upper Level Closed
7/30/24 Full Closure
9/03/24 Local Emergency Declared
10/31/24 – Start of Demolition
11/22/24 – Demolition Complete
12/9/24 – Redevelopment Options Presented to City Council 12/11/24 – Interim Lot Design Kick-off
TIMELINE
January 21, 2025
LOT 3 PARKING STRUCTURE
INTERIM PARKING LOT DESIGN
January 21, 2025
LOT 3 PARKING STRUCTURE
California Green Building Code requirements:
Bicycle Storage
Electric Vehicle Charging Stations
INTERIM PARKING LOT DESIGN
January 21, 2025
LOT 3 PARKING STRUCTURE
City Council may authorize deviations from the Local Coastal Program (LCP) during a Local Emergency:
Authorized by Section A.01.050.K of the LCP
REFUSE ENCLOSURE
January 21, 2025
LOT 3 PARKING STRUCTURE
If waste or recycle containers are stored onsite, a refuse enclosure with the following elements is required:
Full enclosure
Connection to the sewer, with primer
Fire sprinkler(s), depending on location
REFUSE STORAGE AT LOT 3
January 21, 2025
LOT 3 PARKING STRUCTURE
Recycle bins for 4 nearby private properties previously stored within Lot 3 No written agreement or established rent
Estimated cost to construct an enclosure: $135,000
Staff recommends that the City Council:
Determine, by four-fifths vote, that there is a need to continue the emergency action.
Authorize deviations from any applicable provisions of the Manhattan Beach Local Coastal Program.
Provide direction about constructing a refuse enclosure within the interim parking lot.
STAFF RECOMMENDATIONS