LOT 3 PARKING STRUCTURE
JEFF FIJALKA, PRINCIPAL CIVIL ENGINEER JANUARY 21, 2025

6/24/24 Upper Level Closed
7/30/24 Full Closure
9/03/24 Local Emergency Declared
10/31/24 – Start of Demolition
11/22/24 – Demolition Complete
12/9/24 – Redevelopment Options Presented to City Council 12/11/24 – Interim Lot Design Kick-off

TIMELINE
January 21, 2025
LOT 3 PARKING STRUCTURE

INTERIM PARKING LOT DESIGN
January 21, 2025
LOT 3 PARKING STRUCTURE
California Green Building Code requirements:

Bicycle Storage
Electric Vehicle Charging Stations

INTERIM PARKING LOT DESIGN
January 21, 2025
LOT 3 PARKING STRUCTURE
City Council may authorize deviations from the Local Coastal Program (LCP) during a Local Emergency:

Authorized by Section A.01.050.K of the LCP

REFUSE ENCLOSURE
January 21, 2025
LOT 3 PARKING STRUCTURE
If waste or recycle containers are stored onsite, a refuse enclosure with the following elements is required:

Full enclosure
Connection to the sewer, with primer
Fire sprinkler(s), depending on location

REFUSE STORAGE AT LOT 3
January 21, 2025
LOT 3 PARKING STRUCTURE
Recycle bins for 4 nearby private properties previously stored within Lot 3 No written agreement or established rent
Estimated cost to construct an enclosure: $135,000

Staff recommends that the City Council:

Determine, by four-fifths vote, that there is a need to continue the emergency action.

Authorize deviations from any applicable provisions of the Manhattan Beach Local Coastal Program.

Provide direction about constructing a refuse enclosure within the interim parking lot.

STAFF RECOMMENDATIONS