PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM OM
FEBRUARY 06, 2024
CITY COUNCIL MEETING
SEPTEMBER 17TH, 2024
CITY COUNCIL CHAMBERS
FEBRUARY 06, 2024
Sand Dune Park
Improvements
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - Project Progress
Project Initiated
April 2023 - Completed
1st Community Outreach Meeting
April 2023 - Completed
Concepts Developed
February 2024 - Completed
2nd Community Outreach Meeting
March 2024 - Completed
Concepts Refined
April 2024 - Completed
Final Concept
May 2024 - Completed
Commissioner’s Presentation
May 2024 - Completed
City Council Presentation
September 2024 - Completed
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - 1st Community Outreach Meeting
Outreach Meeting Summary NO.1
• Attendees were introduced to the project on site
• Community members had the opportunity to provide input via a dotmocracy exercise
• Residents had the opportunity to give feedback through a vir- tual survey
Survey Summary NO.1
• Community would like an upgraded playground to include elements for older kids
• More lighting throughout the park was requested
• An accessible and modernized office/ restroom was a
significant comment
• Protection of the existing Mulberry trees is essential • Residents requested an outdoor educational programming space
• New fencing was proposed
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - 2nd Community Outreach Meeting
Outreach Meeting Summary NO.2
• Community members had the opportunity to ask questions and provide feedback on two concepts
• Boards allowed residents to provide direct comments on playground equipment and designs
Community Feedback from Meeting Summary NO.2
• Concept two was preferred by the community
• Swings are important to the playground
• Community liked the idea of having an educational space • New lighting and upgraded fences were key comments
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
FENCING LEGEND
ARTISTIC
MURAL WALL
STANDARD
LIGHTING LEGEND
POLE LIGHT
BOLLARD LIGHT
UPLIGHT
Sand Dune Park - Final Concept Plan
GATE TO STAIRCASE
GATE TO DUNE
PICNIC TABLES
5’
10’
20’
30’
40’
50’ N
PROPOSED TREES TYP .
PROPOSED TOT LOT
PLAYGROUND
WOOD DECK
PROPOSED 5-12
PLAYGROUND
SWINGS
PROPOSED CONCRETE
WALK CONNECTING TO
EXISTING WALK
STABILIZED
DECOMPOSED GRANITE
WALKING SURFACE
PREFAB RESTROOMS
OFFICE BUILDING
TRASH & UTILITY
ENCLOSURE
ARBOR SHADE
STRUCTURE
BENCHES TYP .
PROPOSED FENCE
AND GATE ENCLOSING
PLAYGROUND
EXISTING TREES TYP .
PROTECT IN PLACE
NEW PARK SIGNAGE
SCREENING SHRUBS
NEW FENCE
PLANTING OF
ORNAMENTAL GRASS
PLANTING OF
ORNAMENTAL GRASS
ARTISTIC GATES
BIKE RACKS
EXISTING LAWN
EXISTING
MOW CURB
ARBOR SHADE
STRUCTURE
BOULDERS
TYP .
TUBE STEEL
FENCE
PA
PA
PA
PA
PA
PA
PA
EXISTING TREES TYP .
PROTECT IN PLACE
NEW PARK SIGNAGE
NEW RETAINING
WALL W/ MURAL
6” HIGH RAISED
WOOD STAGE
BENCHES TYP .
PA
PA
PA
PA
PA
SCREENING
SHRUBS
PA
0’
GATE AND FENCE
LIGHTING AND BUILDING
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - Playground
Key Elements
• New Tot-Lot and 5-12 Playground
• Wood Play Elements and Climbers
• Swings on Each Side
• Playhouses on Both Sides
• Wood Deck with Seating and Shade
• Proposed Fence and Gate Enclosing Playground
• New Rubberized Surfacing
• Pole and Bollard Lighting
• Proposed Concrete Pathway
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - Proposed Playground Imagery
TOT-LOT
5-12 Playground
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - Tree Preservation
Key Elements
• Stabilized Decomposed Granite Path
• Protecting Existing Mulberry Trees
• Seating
• Pole and Bollard Lighting
• Boulder Accents Along Pathway
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - Stage and Restroom
Key Elements
• Updated Spanish Style Prefab Restroom and Office Building • Arbor Shade Structure Attached to Building
• Seating
• Picnic Tables
• 6” High Raised Wood Stage with Seating
• Tube Steel Fence
• Screening Shrubs
• New Retaining Wall with Mural and Uplighting
• Proposed Concrete Pathway
PREPARED BY: DAVID VOLZ DESIGN
151 KALMUS DR, SUITE M8
COSTA MESA, CA 92626
7146411300
DVDDVOLZDESIGN.COM
FEBRUARY 06, 2024
Sand Dune Park
Sand Dune Park - Sand Dune
Key Elements
• Arbor Shade Structure
• Seating
• Bike Racks
• New Fence and Artistic Gates
• Boulder Accents Along Pathway