Table 1. Annual Assessment Information
Supplier is a Wholesaler
Supplier is a Retailer
If you are both a wholesaler and retailer, will you be submitting two separate reports or a combined report?
Year Covered By This Shortage Report (Required)
Start: July 1, 2025
End: June 30, 2026
Volume Unit for Reported Supply and Demand:
(Must use the same unit throughout) AF
Supplier's Annual Assessment Planning Cycle (Required)
Start Month: July
End Month: June
Data Interval: Monthly (12 data points per year)
Water Supplier's Contact Information (Required)
Water Supplier's Name: Manhattan Beach-City, Water Dept.
Contact Name: Sandy Nimat
Contact Title: Water Compliance Supervisor
Street Address: 3621 Bell Ave
ZIP Code: 90266
Phone Number: (310) 802-5338
Email Address: [email protected]
Report Preparer's Contact Information
(if different from above)
Preparer's Organization Name: West Yost
Preparer's Contact Name: Rhodora Biagtan
Phone Number: (916) 306-2206
Email Address: [email protected]
Supplier's Water Shortage Contingency Plan
WSCP Title Manhattan Beach Water Shortage Contingency Plan (amended 06/21/2022)
WSCP Adoption Date 11/2/2021
Other Annual Assessment Related Activities
Activity Timeline/ Outcomes / Links / Notes
Annual Assessment/ Shortage Report Title: 2025 AWSDA and Water Shortage Report Annual Assessment / Shortage Report Approval Date: MM/DD/YYYY Other Annual Assessment Related Activities: Findings: No water shortage event in 2025 (Add rows as needed)
Type of Supplier (Required to check one or two)
= From prior tables
= Auto calculated
Use Type Start Year: 2025 Volumetric Unit Used2: AF Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Total by Water Demand Type
Single Family 371.87 178.04 391.71 188.24 359.80 177.26 357.59 187.79 335.09 188.96 372.02 220.86 3,329.22 Multi-Family 46.74 22.38 49.24 23.66 45.23 22.28 37.83 19.87 35.45 19.99 39.36 23.37 385.40 Commercial 85.67 41.01 90.24 43.36 82.89 40.83 74.18 38.96 69.52 39.20 77.18 45.82 728.86 Industrial 31.59 15.12 33.27 15.99 30.56 15.06 30.07 15.79 28.18 15.89 31.28 18.57 281.38 Landscape 14.66 7.02 15.45 7.42 14.19 6.99 24.52 12.88 22.97 12.96 25.51 15.14 179.71 Losses 25.54 12.23 26.91 12.93 24.71 12.18 24.70 12.97 23.14 13.05 25.69 15.25 229.30
0.00 0.00
0.00 0.00
576.08 275.80 606.81 291.60 557.38 274.60 548.88 288.26 514.35 290.05 571.04 339.02 5,133.87 Other Nonpotable Recycled Water Tertiary 31.84 15.24 33.54 16.12 30.81 15.18 38.91 20.44 36.47 20.56 40.49 24.04 323.63
0.00 0.00
0.00 0.00
31.84 15.24 33.54 16.12 30.81 15.18 38.91 20.44 36.47 20.56 40.49 24.04 323.63 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Total
0 0
0 0
Three years ago total demand
Four years ago total demand
Optional (for comparison purposes)
Last year's total demand
Two years ago total demand
Table 2: Water Demands1
Projected Water Demands - Volume3
Total by Month (Non-Potable)
1Projections are based on best available data at time of submitting the report and actual demand volumes could be different due to many factors. 2Units of measure (AF, CCF, MG) must remain consistent. 3When opting to provide other than monthly volumes (bi-monthly, quarterly, or annual), please see directions on entering data for Projected Water Demand in the Table Instructions.
Notes:
1. Projected water demands are interpolated from the City's 2020 Urban Water Management Plan. Monthly water demands are projected from the City's monthly demand curves from Calendar Year 2024.
2. Projections assume that demands are unconstrained.
Total by Month (Potable)
Additional
Description
(as needed)
Level of
Treatment
for Non-
Potable
Supplies
Drop-down
list
Drop-down list
May select each use multiple times
These are the only Use Types that will
be recognized by the WUEdata online
submittal tool
(Add additional rows as needed)
Demands Served by Potable Supplies
Demands Served by Non-Potable Supplies
= From prior tables
= Auto calculated
Water Supply Start Year: 2025 Volumetric Unit Used2: AF Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Total by
Water
Supply Type
Purchased/Imported Water 525.31 251.50 553.34 265.91 508.27 250.40 480.31 252.25 450.09 253.81 493.00 289.97 4,574.16 Groundwater (not desal.) 50.76 24.30 53.47 25.70 49.11 24.20 68.57 36.01 64.26 36.24 71.34 42.35 546.31
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
576.08 275.80 606.81 291.60 557.38 274.60 548.88 288.26 514.35 290.05 564.34 332.32 5,120.47 0.00 Recycled Water 31.84 15.24 33.54 16.12 30.81 15.18 38.91 20.44 36.47 20.56 40.49 24.04 323.63
0.00 0.00
0.00 0.00
31.84 15.24 33.54 16.12 30.81 15.18 38.91 20.44 36.47 20.56 40.49 24.04 323.63 0.00 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Total
0 Potable Supplies
Non-Potable Supplies
eAR Reported Total Water Supplies
Optional (for comparison purposes)
1Projections are based on best available data at time of submitting the report and actual supply volumes could be different due to many factors. 2Units of measure (AF, CCF, MG) must remain consistent. 3When opting to provide other than monthly volumes (bi-monthly, quarterly, or annual), please see directions on entering data for Projected Water Supplies in the Table Instructions.
Notes:
1. Projections assume a normal year for 2025 and single dry year for 2026, as defined in City's 2020 UWMP. Dry months are assumed to be between May and October 2026.
2. Projections assume that recycled water is not adversely impacted by drought conditions per the City's 2020 UWMP Section 7.3.2.
3. Purchased/imported water and recycled water are purchased from West Basin Municipal Water District and groundwater is pumped by City wells from the West Coast Basin.
Total by Month (Potable)
Total by Month (Non-Potable)
Table 3: Water Supplies1
Projected Water Supplies - Volume3
Water
Quality
Drop-down
List
Total Right
or Safe
Yield*
(optional)
Additional
Detail on
Water Supply
Drop-down List
May use each category multiple
times.These are the only water
supply categories that will be
recognized by the WUEdata online
submittal tool
(Add additional rows as needed)
= Auto calculated
= For manual input
Table 4(P): Potable Water Shortage Assessment1
Start Year: 2025 Volumetric Unit Used2: AF
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun3 Total
Anticipated Unconstrained Demand 576.1 275.8 606.8 291.6 557.4 274.6 548.9 288.3 514.4 290.0 571.0 339.0 5133.87 Anticipated Total Water Supply 576.1 275.8 606.8 291.6 557.4 274.6 548.9 288.3 514.4 290.0 564.3 332.3 5120.47 Surplus/Shortage w/o WSCP Action 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -6.7 -6.7 -13.4 % Surplus/Shortage w/o WSCP Action 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% -1% -2% 0% State Standard Shortage Level 0 0 0 0 0 0 0 0 0 0 1 1 1 Benefit from WSCP: Supply Augmentation 0.0
Benefit from WSCP: Demand Reduction 86.4 41.4 91.0 43.7 83.6 41.2 82.3 43.2 77.2 43.5 85.7 50.9 770.1 Revised Surplus/Shortage with WSCP 86.4 41.4 91.0 43.7 83.6 41.2 82.3 43.2 77.2 43.5 79.0 44.2 756.7 % Revised Surplus/Shortage with WSCP 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 14% 13% 15% = Auto calculated
= For manual input
Table 4(NP): Non-Potable Water Shortage Assessment1
Start Year: 2025 Volumetric Unit Used2: AF
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun3 Total
Anticipated Unconstrained Demand: Non-Potable 31.8 15.2 33.5 16.1 30.8 15.2 38.9 20.4 36.5 20.6 40.5 24.0 323.63 Anticipated Total Water Supply: Non-Potable 31.8 15.2 33.5 16.1 30.8 15.2 38.9 20.4 36.5 20.6 40.5 24.0 323.6 Surplus/Shortage w/o WSCP Action: Non-Potable 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 % Surplus/Shortage w/o WSCP Action: Non-Potable 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Benefit from WSCP: Supply Augmentation 0.0
Benefit from WSCP: Demand Reduction 0.0
Revised Surplus/Shortage with WSCP 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 % Revised Surplus/Shortage with WSCP 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1Assessments are based on best available data at time of submitting the report and actual volumes could be different due to many factors. 2Units of measure (AF, CCF, MG) must remain consistent. 3When optional monthly volumes aren't provided, verify Tables 2 and 3 use the same columns for data entry and are reflected properly in Table 4 and make sure to use those same columns to enter the benefits from Planned WSCP Actions. Please see directions on the shortage balancing exercise in the Table Instructions. If a shortage is projected, the supplier is highly recommended to perform a monthly analysis to more accurately identify the time of shortage. 4If you enter any WSCP Benefits, then you must enter the corresponding planned Actions into Table 5. = From prior tables
Planned WSCP Actions4
1Assessments are based on best available data at time of submitting the report and actual volumes could be different due to many factors. 2Units of measure (AF, CCF, MG) must remain consistent. 3When optional monthly volumes aren't provided, verify Tables 2 and 3 use the same columns for data entry and are reflected properly in Table 4 and make sure to use those same columns to enter the benefits from Planned WSCP Actions. Please see directions on the shortage balancing exercise in the Table Instructions. If a shortage is projected, the supplier is highly recommended to perform a monthly analysis to more accurately identify the time of shortage. 4If you enter any WSCP Benefits, then you must enter the corresponding planned Actions into Table 5. = From prior tables
Planned WSCP Actions4
July 1, 2025 to June 30, 2026
Enter Amount
(Drop-down
List)
Select % or
Volume Unit
Start Month End Month
0 (No Shortage)
Landscape - Limit landscape irrigation to
specific times Yes July June
0 (No Shortage) Landscape - Limit landscape irrigation to specific days Yes July June
0 (No Shortage)
Other - Customers must repair leaks,
breaks, and malfunctions in a timely
manner
Yes July June
1 Landscape - Limit landscape irrigation to
specific days Yes 6.7 AF May June
NOTES:
Notes Section to be used only
for clarifying details, and not
for listing specific actions.
Actions must be entred into
table rows above.
1If you plan Supply Augmentation Actions then you must enter WSCP Benefits from Supply Augmentation Actions into Table 4. If you plan Demand Reduction Actions then you must enter WSCP Benefits from Demand Reduction Actions into Table 4. 2If an Action is planned to be implemented in multiple non-contiguous periods of the year, please make separate entries on multiple rows for the same action spanning the different implementation periods.
Table 5: Planned Water Shortage Response Actions
Add additional rows as needed
How much is action going to
reduce the shortage gap?
(Optional)
When is shortage response
action anticipated to be
implemented2?Is action
already being
implemented?
(Y/N)
ACTIONS1: Demand Reduction, Supply
Augmentation, and Other Actions.
(Drop-down List)
These are the only categories that will be
accepted by the WUEdata online submittal
tool. Select those that apply.
Anticipated Shortage
Level
Drop-down List of
State Standard Levels (1 -
6) and Level 0 (No
Shortage)