Circuit Reliability Review
Manhattan Beach
2024
2 • Southern California Edison (SCE)
is an Edison International
company
• One of the nation’s largest
electric utilities
• More than 130 years of history
• Headquartered in Rosemead,
California
• Regulated by the California
Public Utilities Commission
(CPUC) and the Federal Energy
Regulatory Commission (FERC)
• 50,000 square miles of SCE
service area across Central,
Coastal, and Southern California
• 15 million residents through 5
million customer accounts
• 15 counties, 185 cities and 13
Native American tribes
Who We Are

Our Grid
To deliver safe, reliable, and affordable power,
we monitor and maintain a vast electricity system
753,000 Transformers
126,000 Miles of Transmission
and Distribution Lines
5,500 Circuits

1.7 Million Poles
50,000 Square Miles
3 Strengthening and Modernizing the Grid
• Infrastructure reliability – updating
underground cables, poles, switches, and
transformers
• Wildfire mitigation – hardening infrastructure,
bolstering situational awareness capabilities,
and enhancing operational practices
• Transmission – connecting renewables,
installing new substations, and updating lines
• Grid readiness – updating the grid for impacts
from new technologies
• Long-term energy policy – supporting energy
storage, electric vehicles, and renewables
SCE plans to spend more than $5B each
year to maintain, improve, and harden
its infrastructure
SCE’s investments support safe, reliable, affordable, and clean energy for our customers 2023 Capital Investments

27.5 miles of
underground cable replaced
112.5 miles of overhead conductor
replaced for public safety

13.9k distribution poles replaced

2.5k transmission poles replaced
39 underground structure
replacements
4 REDUCING WILDFIRE RISK & PSPS IMPACTS – BY THE NUMBERS

1. A wildfire directly causing one or more deaths, damaging or destroying more than 500 structures, or burning more than 140,000 acres of land

2. ~22M customer minutes of interruption in 2023 compared to ~268M in 2020, not normalized for weather Data as of 12/31/2023 5,580+ MILES

OF COVERED CONDUCTOR
2 MILLION+

TRIMS AND REMOVALS
1 MILLION+

HFRA INSPECTIONS
1,730+

WEATHER STATIONS
190+

HD CAMERAS
• 90% less PSPS outage time in 2023 compared to 20202
• 63 Community Resource Centers and 8 Community Crew Vehicles available • Deployed 14,300+ Critical Care Back-up batteries to Medical Baseline customers

IMPROVED PSPS EXECUTION & CUSTOMER SUPPORT
SCE has reduced the probability of catastrophic1 wildfires associated with its equipment by about 85-88% since 2018
Completed in high fire risk areas since 2018
5 6
2023 YEAR -END PROGRESS UPDATE

Protecting Public Safety: Public Safety Power Shutoffs
7 • SCE implements Public Safety Power Shutoffs
(PSPS) to temporarily shut off power to some
communities when there is a high risk for
wildfire to prevent the electric system from
becoming the source of ignition
• PSPS is used as a measure of last resort to
protect public safety under dangerous fire
weather conditions, including high winds, low
humidity, and dry vegetation
• Multiple methods are used to notify customers
and stakeholders in impacted areas before,
during and after a PSPS event
• SCE provides resources to support customers
during PSPS and offers several programs and
rebates to help customers be prepared and
more resilient during emergencies
• SCE is working to reduce the impact of PSPS
and is continuing to strengthen the electric
grid to become more resilient in the face of
extreme weather events
• To learn more, visit sce.com/psps

SCE’s System Planning Process
8 • Southern California Edison (SCE)
performs annual system evaluations to
address the changing power needs
throughout its service territory
• System capacity plans are developed on
a 10-year forecast based on information
provided by customers and load
forecasting methodologies
• Accurate and timely customer
information is crucial to system planning
evaluations
• Developers should contact SCE as
early as possible to initiate discussions
with planning on power service
needs.

SCE’s Forecasting Process
9 • SCE’s forecasting team is actively engaged with internal and external stakeholders to make sure that we build a forecast that reflects current program, policies, and development plans which impact the grid
• SCE’s forecasting team uses different data sources for forecasting the future Distributed Energy Resource (DER) load such as:
▪ Customer Data such as historical customer usage and DER adoption such as electric vehicles (EV)
o Demographic and Socio-Economic Data
o Customer program and survey participation results
o Existing project development impact
o Short and long-term customer plans on DER adoption such EV charging sites
When Should I Contact SCE Regarding Power Needs?
10 Plan Ahead – Providing Energy
Capacity
Did You Know? A new 12 kV circuit
which provides about 10MW of
power (roughly 12,000 amps @480 V)
can take between 2 to 3 years to
construct.

Did you Know? A new customer-
owned substation can take between 3
to 5 years to construct.

The more project information a
customer can provide and the earlier
they can reach out to SCE concerning
the energy requirements for a new
building project (or for upgrading an
existing building) the better.
• The Short Answer: As Soon As Possible. For
example, when you contact the city to initiate
business permits, reach out to SCE as well to
discuss your plans
• SCE will always provide the power our customers
require to operate their business but upgrades
to our grid may be required. Partnering with
SCE early will help ensure that the level of power
required is delivered in both a timely – and safe –
manner
• Customers should contact SCE as early as
possible, preferably 2 years, especially for large
power requests
• Contact the appropriate planning department to
discuss and review the scope of your project,
including plans for phasing in power
Countdown to 2045
11 • Builds on Pathway 2045 analysis (released in 2019) to account for recent state policies, climate impacts, reliability modeling, and market/technology advancements
• Updated analysis indicates deeper electrification by 2045 (90+% of vehicles and space/water heating in buildings) drives greater load and new system peaks
• As a result, the generation mix in 2045 more than doubles; solar, wind, and storage make up the majority of capacity; retained gas generation and emerging technologies (e.g., offshore wind, clean firm baseload) serve important roles to ensure system reliability • New transmission and distribution needed at unprecedented scale and speed (4-10x historical rates), requiring policy changes and increased operational efficiencies to plan, build, and operate; technology investment to optimize DERs at scale
• Clean power and electrification approach remains the most feasible and cost-effective way to meet state goals, despite a significant level of investments (~$370B statewide); the average SCE household can expect to save ~40% on total energy costs

Keeping Bills Manageable
12 Here are ways SCE provides help to customers
facing challenges with their energy bills
Our Commitment to Customers
SCE is continually seeking innovative ways to get more work done at less cost to customers, running our business to get the most productivity out of each dollar. That’s the commitment SCE makes to the residents, businesses and communities in our service area who depend on us 24/7 to safely deliver, reliable, affordable and clean energy.

Discounted Rates
Our California Alternate Rates
for Energy (CARE) and Family
Electric Rate Assistance (FERA)
financial assistance programs
help qualifying families of all
sizes lower their monthly
energy bills when they need it
most.

Rebates and Incentives
Get discounts or money back
when purchasing smart
thermostats and other products
that help reduce energy usage,
which in turn helps lower
monthly bills.

Demand Response
Energy-saving programs such as
the Smart Energy Program,
Power Saver Rewards and
Summer Discount Program
reward customers with bill
credits for reducing electricity
usage when the demand for
energy is high.

Assistance Options
Offering a range of options to
support you, including payment
extensions and monthly
installment plans for past due
balances, debt forgiveness and
new energy-efficient appliances
as low or no cost.

Reliability Overview
13 14
What is Reliability?
• In simplest terms:
• Having dependable electricity when you need it
• Potential interruptions to dependable service
include the following:
• Maintenance outages (aka planned outages)
• Repair outages (aka unplanned outages)
• Sustained Outage = An outage lasting > 5
minutes
• Momentary Outage = An outage lasting ≤ 5
minutes
• Public Safety Power Shutoff (PSPS)
• Major Event Day (MED)
Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather). MEDs are sometimes excluded in reporting; in those reports, the exclusions will be noted.

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high-fire areas are experiencing adverse weather or public safety is at risk. 15 How Do We Measure Reliability?
Total minutes every
SCE customer was
without power due
to sustained
outages
Total number of
customers
SAIDI*
System Average
Interruption
Duration Index
Total number of
sustained customer
outages
experienced by SCE
customers (CI)
Total number of
customers
SAIFI*
System Average
Interruption
Frequency Index
Total number of
momentary
customer outages
experienced by SCE
customers (CI)
Total number of
customers
MAIFI *
Momentary
Average
Interruption
Frequency Index
What’s the average
amount of time my
power service will be
unexpectedly
interrupted?
What’s the average
number of times my
power service will be
unexpectedly
interrupted?
What’s the average
number of times my
power service will be
momentarily (< 5
minutes) interrupted?
*Only for unplanned outages; maintenance outages are not included in SAIDI, SAIFI, and MAIFI Equipment Failure In-service failure of transformer, switch, or conductors
Vegetation/Animal A tree branch, rodent, or bird causes a short circuit between conductors
Other The circuit was patrolled but no cause was found Operations SCE performed urgent work due to findings in the field that resulted in the need for an outage
3rd Party Outage caused by a balloon, a car hit pole, or dig-in
PSPS Public Safety Power Shutoff sce.com/psps
SAIDI & SAIFI Cause Definitions
16 BarChart
17 * NO EXCLUSIONS **Data is as of 03/21/2024, data can be slightly different due to outage data validation process Historical Reliability of Circuits Serving Manhattan Beach

1.8 1.4

2.7 1.3

1.4 1.6

1.4 1.4
MAIFI
(the average frequency of
momentary interruptions)

SCE GRID
Manhattan Beach
118.0

64.9 139.5
117.6
201.3
179.8
131.1
115.9
2020
2021
2022
2023
SAIDI
(the average minutes of
sustained interruptions)

1.7 0.8

1.5 1.7

1.1 1.1

1.1 1.0
SAIFI
(the average frequency of
sustained interruptions)
SAIDIChart
18 0.0%

1.1%

2.2%

8.9%

10.4%

36.7%

40.6%
PSPS
3rd Party
Other
Operation
Weather /Fire /Earthquake
Equipment Failure
Vegetation /Animal
2023 SAIDI Outage Causes for Manhattan Beach
SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

SAIFIChart
19 0.0%

0.1%

0.8%

4.8%

11.2%

32.9%

50.2%
PSPS
3rd Party
Other
Operation
Weather /Fire /Earthquake
Equipment Failure
Vegetation /Animal
2023 SAIFI Outage Causes for Manhattan Beach
SAIFI = the number of times the average customer is interrupted by “sustained” outages each year.

CircuitList1
Overview of Manhattan Beach
There are 16 circuits that serve Manhattan Beach 1
Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers BARRACUDA(16KV) 229 - - -
BORDEN(4KV) 1,024 - - -
CLEO(4KV) 1,084 - - -
CYLINDER(16KV) 1,339 - - -
GRIZZLEY(16KV) 3,803 - - -
HARKNESS(4KV) 846 - - -
HILL(4KV) 758 - - -
KATHLEEN(16KV) 702 - - -
KEATS(4KV) 95 - - -
OZONE(4KV) 644 - - -
PENGUIN(16KV) 445 - - -
PISTON(16KV) 4,372 - - -
SALMON(16KV) 4,136 - - -
VALVE(16KV) 3,449 - - -
NORTH BEACH(4KV) 826 - - -
SOUTH STRAND(4KV) 652 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Grand Total 24,402
Note: The number of customers listed
represents the total number of customers on
each circuit (not the local jurisdiction).
20 *Circuits with zero customers will not appear on this list. The reliability results for all the years provided in this report only reflects the circuits listed above.

CircuitMap
21 22
Capital Improvement Map
The capital improvement map has transitioned to a virtual format via SCE Capital Improvements and can be accessed using the link provided or sce.com/CapitalImprovements.

Back-up Slides
Reliability Histories of Circuits Serving Manhattan Beach Updated through Dec 2023
CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI 118.0 1.7 1.8 64.9 0.8 1.4 139.5 1.5 2.7 84.9 1.1 0.5 1.3 0.0 0.3 14.0 0.1 0.1 17.5 0.5 0.4 117.6 1.7 1.3 3rd Party 24% 3% 24% 23% 7% 6% 3% 2% - 2% 0% 15% - - - - - - - - - 1% 0% 6% Equipment Failure 62% 52% 54% 65% 85% 54% 66% 49% 13% 40% 34% 23% 82% 71% 32% 4% 35% - 43% 30% 5% 37% 33% 17% Operation 5% 13% 0% 10% 8% 0% 2% 1% - 0% 0% - 18% 29% - 62% 17% 0% 8% 11% 1% 9% 5% 0% Other 6% 23% 15% 0% 0% 25% 1% 11% 8% 3% 1% 28% - - 68% - - 22% - - - 2% 1% 27% Vegetation/Animal - - - 1% 0% - 14% 23% 60% 55% 65% 34% - - - - - - 6% 29% 89% 41% 50% 39% Weather/Fire/Earthquake 2% 10% 8% 0% 0% 14% 14% 13% 19% - - - - - - 34% 47% 78% 43% 29% 5% 10% 11% 9%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
SCE SYSTEMWIDE 201.3 1.1 1.4 179.8 1.1 1.6 131.1 1.1 1.4 38.5 0.3 0.4 20.5 0.2 0.4 31.8 0.3 0.3 25.1 0.2 0.3 115.9 1.0 1.4 Average Reliability of 16 Circuits Serving Manhattan Beach 4th Qtr 2023 20232020 2021 2022 1st Qtr 2023 2nd Qtr 2023 3rd Qtr 2023 16 Circuits Serving Manhattan Beach -- Total
Customers: 24,402
24 Notes:

No outages are excluded from the metrics.

Outage Causes:

Other: e.g., patrolled but no cause could be found
Operations: e.g., urgent maintenance w/o 3-day notice to customers 3rd Party: e.g., balloons, car hit pole, dig-in
Vegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductors PSPS: e.g., Public Safety Power Shutoff
SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary" (lasting 5 minutes or less) outages.

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI BARRACUDA(16KV) - Customers: 229 90.5 1.1 - 6.6 0.2 - - - 1.0 - - - - - - 1.0 0.0 - - - - 1.0 0.0 - 3rd Party - - - 13% 39% - - - - - - - - - - - - - - - - - - - Equipment Failure - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% - Operation 100% 100% - 87% 61% - - - - - - - - - - - - - - - - - - - Other - - - - - - - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - 100% - - - - - - - - - - - - - - - Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
BORDEN(4KV) - Customers: 1,024 0.3 0.0 1.3 281.0 1.0 5.2 1.8 0.0 1.0 92.8 1.0 1.9 2.2 0.0 - - - - 15.3 1.0 - 110.3 2.1 1.9 3rd Party - - 100% 99% 99% 20% - - - 33% 4% 100% - - - - - - - - - 28% 2% 100% Equipment Failure - - - 1% 1% 20% 100% 100% - 1% 1% - 100% 100% - - - - - - - 3% 1% - Operation 100% 100% - - - - - - - - - - - - - - - - 100% 100% - 14% 49% - Other - - - - - 40% - - - - - - - - - - - - - - - - - - Vegetation/Animal - - - - - - - - 100% 66% 95% - - - - - - - - - - 55% 48% - Weather/Fire/Earthquake - - - - - 20% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
CLEO(4KV) - Customers: 1,084 6.6 0.0 - - - 2.0 1.1 0.0 2.0 61.5 1.0 - - - - 0.2 0.0 0.0 - - 1.0 61.6 1.0 1.0 3rd Party - - - - - 50% - - - - - - - - - - - - - - - - - - Equipment Failure 15% 58% - - - 50% 100% 100% - - - - - - - - - - - - - - - - Operation 85% 42% - - - - - - - 0% 2% - - - - 100% 100% 100% - - - 0% 3% 1% Other - - - - - - - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - 100% 100% 98% - - - - - - - - - 100% 100% 97% 99% Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
CYLINDER(16KV) - Customers: 1,339 4.3 0.0 - 66.5 1.1 2.0 104.4 0.7 2.3 144.2 2.1 - 0.3 0.0 - 0.8 0.0 - - - - 145.4 2.1 - 3rd Party - - - 68% 6% - - - - - - - - - - - - - - - - - - - Equipment Failure 24% 22% - 32% 94% 50% 100% 100% 14% - - - - - - 100% 100% - - - - 1% 0% - Operation 76% 78% - - - - - - - - - - 100% 100% - - - - - - - 0% 0% - Other - - - - - 50% - - - 11% 10% - - - - - - - - - - 11% 10% - Vegetation/Animal - - - - - - - - 86% 89% 90% - - - - - - - - - - 89% 89% - Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Manhattan Beach - 1 of 4 2020 2021 2022 1st Qtr 2023 2nd Qtr 2023 3rd Qtr 2023 4th Qtr 2023 2023 25 CircuitHistory
2 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI GRIZZLEY(16KV) - Customers: 3,803 30.6 1.9 0.0 7.6 0.0 1.0 239.3 3.4 2.9 - - 1.0 0.1 0.0 - - - - 0.1 0.0 1.0 0.2 0.0 2.0 3rd Party - - - 19% 13% - - - - - - - - - - - - - - - - - - - Equipment Failure 2% 0% - 39% 34% 2% 45% 30% - - - - - - - - - - - - - - - - Operation 45% 51% 100% 42% 54% - 0% 0% - - - - 100% 100% - - - - 100% 100% 0% 100% 100% 0% Other 53% 49% - - - - 3% 29% - - - - - - - - - - - - - - - - Vegetation/Animal - - - - - - 37% 29% 34% - - 100% - - - - - - - - 100% - - 100% Weather/Fire/Earthquake - - - - - 98% 15% 11% 66% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
HARKNESS(4KV) - Customers: 846 839.4 1.2 - 6.3 0.0 2.0 117.8 0.2 2.0 61.3 1.0 - - - - - - - - - 1.0 61.3 1.0 1.0 3rd Party 98% 93% - - - - 11% 15% - - - - - - - - - - - - - - - - Equipment Failure 2% 3% - 100% 100% 100% 85% 82% - - - - - - - - - - - - - - - - Operation 0% 4% - - - - 4% 2% - - - - - - - - - - - - - - - - Other - - - - - - - - - - - - - - - - - - - - - - - -
Vegetation/Animal - - - - - - - - 100% 100% 100% - - - - - - - - - 100% 100% 100% 100% Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
HILL(4KV) - Customers: 758 2.2 0.0 1.5 14.5 1.0 1.0 164.4 1.0 2.0 61.1 1.0 2.0 - - - 3.4 0.0 - 7.6 0.1 - 72.1 1.1 2.0 3rd Party - - - - - - - - - - - - - - - - - - - - - - - - Equipment Failure 74% 32% 100% 100% 100% 100% 100% 100% - - - 50% - - - 100% 100% - 82% 28% - 13% 4% 50% Operation 26% 68% - - - - - - - - - - - - - - - - 18% 72% - 2% 3% - Other - - - - - - - - - - - 50% - - - - - - - - - - - 50% Vegetation/Animal - - - - - - - - 100% 100% 100% - - - - - - - - - - 85% 93% - Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
KATHLEEN(16KV) - Customers: 702 8.4 0.0 - 1.2 0.0 1.0 301.8 2.4 12.0 71.3 0.1 1.0 - - - 13.4 1.0 1.0 - - 2.0 84.8 1.1 4.0 3rd Party - - - - - - - - - - - - - - - - - - - - - - - - Equipment Failure - - - - - - 48% 83% 59% 12% 41% - - - - 100% 100% - - - - 26% 95% - Operation 100% 100% - 100% 100% - - - - - - - - - - - - - - - - - - - Other - - - - - 100% - - 8% 88% 59% 100% - - - - - 100% - - - 74% 5% 50% Vegetation/Animal - - - - - - - - 33% - - - - - - - - - - - 100% - - 50% Weather/Fire/Earthquake - - - - - - 52% 17% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Manhattan Beach - 2 of 4 2020 2021 2022 1st Qtr 2023 2nd Qtr 2023 3rd Qtr 2023 4th Qtr 2023 2023 26 CircuitHistory
3 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI KEATS(4KV) - Customers: 95 - - 1.0 14.1 1.0 0.9 554.7 1.3 1.9 60.8 1.0 2.0 - - - - - - - - - 60.8 1.0 2.0 3rd Party - - - - - - - - - - - - - - - - - - - - - - - - Equipment Failure - - 100% 100% 100% 100% 100% 100% - - - 50% - - - - - - - - - - - 50% Operation - - - - - - - - - - - - - - - - - - - - - - - - Other - - - - - - - - - - - 50% - - - - - - - - - - - 50% Vegetation/Animal - - - - - - - - 100% 100% 100% - - - - - - - - - - 100% 100% - Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
NORTH BEACH(4KV) - Customers: 826 1.0 0.1 4.4 49.4 2.1 1.0 440.7 1.0 2.0 65.6 1.0 2.0 1.8 0.1 - 0.6 0.0 - - - - 68.0 1.1 2.0 3rd Party - - 29% - - - - - - - - - - - - - - - - - - - - - Equipment Failure - - 29% 30% 50% 100% 100% 98% - - - 50% 16% 57% - 100% 100% - - - - 1% 4% 50% Operation 100% 100% - 70% 50% - 0% 2% - 5% 4% - 84% 43% - - - - - - - 7% 7% - Other - - 43% - - - - - - - - 50% - - - - - - - - - - - 50% Vegetation/Animal - - - - - - - - 100% 95% 96% - - - - - - - - - - 92% 89% - Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
OZONE(4KV) - Customers: 644 2.9 0.0 1.4 38.5 2.6 1.1 239.1 1.1 2.0 59.8 1.0 1.9 - - - - - - 0.6 0.0 - 60.5 1.0 1.9 3rd Party - - - - - - - - - - - - - - - - - - - - - - - - Equipment Failure 100% 100% 100% 100% 100% 98% 100% 98% - - - 50% - - - - - - - - - - - 50% Operation - - - - - 2% 0% 2% - - - - - - - - - - 100% 100% - 1% 2% - Other - - - - - - - - - - - 50% - - - - - - - - - - - 50% Vegetation/Animal - - - - - - - - 100% 100% 100% - - - - - - - - - - 99% 98% - Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
PENGUIN(16KV) - Customers: 445 15.0 1.1 - - - - 33.7 1.0 1.0 - - - - - - - - - - - 1.0 - - 1.0 3rd Party - - - - - - - - - - - - - - - - - - - - - - - - Equipment Failure - - - - - - 35% 3% - - - - - - - - - - - - - - - - Operation - - - - - - - - - - - - - - - - - - - - - - - - Other 100% 100% - - - - - - 100% - - - - - - - - - - - - - - - Vegetation/Animal - - - - - - 65% 97% - - - - - - - - - - - - 100% - - 100% Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Manhattan Beach - 3 of 4 2020 2021 2022 1st Qtr 2023 2nd Qtr 2023 3rd Qtr 2023 4th Qtr 2023 2023 27 CircuitHistory
4 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI PISTON(16KV) - Customers: 4,372 7.2 0.0 4.8 85.3 1.1 1.3 125.0 1.5 4.1 130.4 1.7 - 3.0 0.0 1.5 47.6 0.1 - - - - 181.0 1.8 1.5 3rd Party 22% 9% 34% - - - 12% 4% - - - - - - - - - - - - - - - - Equipment Failure 20% 46% 44% 85% 93% 100% 46% 48% 18% 25% 19% - 100% 100% 32% - - - - - - 20% 20% 32% Operation 47% 26% - 13% 5% - 0% 1% - - - - - - - 100% 100% - - - - 26% 4% - Other 12% 18% 22% 2% 2% - - - - - - - - - 68% - - - - - - - - 68% Vegetation/Animal - - - - - - 0% 1% 74% 75% 81% - - - - - - - - - - 54% 77% - Weather/Fire/Earthquake - - - - - - 41% 46% 8% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
SALMON(16KV) - Customers: 4,136 539.7 7.4 1.7 150.8 1.8 1.2 125.0 2.3 2.0 157.1 1.7 - 2.4 0.0 - 0.2 0.0 - 93.5 2.6 0.4 253.3 4.4 0.4 3rd Party - - - 2% 2% - 3% 2% - - - - - - - - - - - - - - - - Equipment Failure 95% 81% 99% 97% 97% 10% 65% 52% - 100% 100% - 100% 100% - 44% 11% - 46% 34% 32% 80% 60% 32% Operation 0% 0% 1% 1% 1% - 5% 3% - - - - - - - 56% 89% - - - 4% 0% 0% 4% Other 4% 18% - - - 90% - - 50% - - - - - - - - - - - - - - - Vegetation/Animal - - - - - - 27% 43% - - - - - - - - - - 7% 33% 32% 2% 20% 32% Weather/Fire/Earthquake - - - - - - - - 50% - - - - - - - - - 47% 33% 32% 17% 20% 32%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
SOUTH STRAND(4KV) - Customers: 652 12.4 0.5 1.8 14.8 1.0 1.0 290.1 1.3 2.0 - - 3.0 5.3 0.0 - - - - - - - 5.3 0.0 3.0 3rd Party 97% 92% - - - - - - - - - - - - - - - - - - - - - - Equipment Failure - - 100% 100% 100% 100% 85% 77% - - - 33% - - - - - - - - - - - 33% Operation 3% 8% - - - - 9% 7% - - - - 100% 100% - - - - - - - 100% 100% - Other - - - - - - 5% 16% - - - 33% - - - - - - - - - - - 33% Vegetation/Animal - - - - - - - - 100% - - 34% - - - - - - - - - - - 34% Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
VALVE(16KV) - Customers: 3,449 30.0 1.2 2.2 24.9 0.1 1.0 20.2 0.1 2.0 72.7 1.1 - - - - 34.1 0.3 0.7 4.9 0.1 - 111.7 1.5 0.7 3rd Party - - - - - - 25% 42% - - - - - - - - - - - - - - - - Equipment Failure 8% 1% 54% 10% 15% 100% 45% 43% - 11% 9% - - - - - - - - - - 7% 7% - Operation 28% 4% - 63% 74% - 21% 3% - 1% 1% - - - - 1% 3% - 100% 100% - 6% 7% - Other - - - - - - 9% 12% - - - - - - - - - - - - - - - - Vegetation/Animal - - - 20% 7% - - - 100% 87% 90% - - - - - - - - - - 57% 67% - Weather/Fire/Earthquake 63% 96% 46% 7% 4% - - - - - - - - - - 99% 97% 100% - - - 30% 19% 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -
Reliability Histories for Individual Circuits Serving Manhattan Beach - 4 of 4 2020 2021 2022 1st Qtr 2023 2nd Qtr 2023 3rd Qtr 2023 4th Qtr 2023 2023 28