Cities Index.
MB DC Infiltration Project Feasibility Study Summary Memo (2026-03-06)_Complete

Manhattan Beach City Council
March 17, 2026

Document
MB DC Infiltration Project Feasibility Study Summary Memo (2026-03-06)_Complete
Meeting
March 17, 2026
Body
Manhattan Beach City Council
Pages
6
Original file
9.5 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

5901 W Century Blvd, Suite 1450
Los Angeles, CA 90045
PH +1 310-957-6117
www.geosyntec.com

MB Feasibility Study Summary Memo (2026-03-06).docx

Memorandum
Date: March 6, 2026
To: Eduardo Pech, PE, City of Manhattan Beach
From: Curtis Fang, PE, PMP.

Subject: Manhattan Beach Dominguez Channel Stormwater Infiltration Project Feasibility Study Summary Memo
Project #: CWR0935

INTRODUCTION
Geosyntec Consultants (Geosyntec) is contracted by the City of Manhattan Beach (City) to perform the feasibility study of the Manhattan Beach Dominguez Channel Stormwater Infiltration Project (Project). The City has been coordinating with Cities of Manhan Beach, Hermosa Beach, Torrance, and Los Angeles County Flood Control District to prepare and implement the 2024 Beach Cities Watershed Management Program ( Beach Cities WMP), supported by an updated Reasonable Assurance Analysis (RAA) modeling effort. Accor ding to the Beach Cities WMP implementation strategy, in order to meet stormwater pollutant control objectives for the Dominguez Channel watershed, the City is required to implement stormwater capture projects to address a 24 -hour management volume of at least 5.42 acre-feet from the City’s drainage area within the DC -MB analysis region (Geosyntec, 2024). These 24- hour management volumes are equivalent to the stormwater runoff from the 90
th percentile wet day from the City’s drainage areas
to Dominguez Channel that are not otherwise retained by existing natural or engineered stormwater infrastructures, in addition to the City’s 24-hour stormwater management capacity received at the downstream Alondra Park Stormwater Capture Project.

As part of the feasibility study, Geosyntec has completed the following analyses to support developing the preliminary design concept alternatives:
• Geotechnical Investigation (Geosyntec, 2025a) – Geosyntec reviewed existing geological, groundwater, and potential geohazard information; performed subsurface explorations, in-situ testing, sampling, and full-scale drywell percolation testing; coordinated geotechnical laboratory testing; and analyzed laboratory testing infiltration testing results to assess the feasibility of a capture and infiltration system via a series of distributed drywells along Parkview Avenue. Based on the findings from the geotechnical investigation, Geosyntec found that while the site may appear generally suitable for stormwater infiltration from a geological and geotechnical perspective, results of the environmental testing suggest that stormwater infiltration through drywells may not be considered feasible due to potential contaminant mobilization risk. • Hydrology Analysis (Geosyntec, 2025b) – Geosyntec performed hydrologic modeling, hydraulic modeling, and best management practice (BMP) performance simulation Manhattan Beach Dominguez Channel Stormwater Infiltration Project Feasibility Study Summary Memo

Page 2 ends

MB Feasibility Study Summary Memo (2026-03-06).docx

modeling to support an alternative design, which proposes to install stormwater detention BMPs and retrofit the existing pond and pump station at the West drift Golf Course.

Based on the findings of the hydrology analysis, the proposed storage capacities of the Project BMP are sufficient in detaining stormwater runoff from the 90 th percentile wet
day without bypass (5.42 acre-feet) and meeting the load reduction requirements outlined in the Beach Cities WMP. Geosyntec also found that the proposed retrofitted pump station would require a minimum pumping capacity of 10.7 cfs to drain the Wesdrift Golf Course within 75 hours for the 50-year, 24 storm event. The existing pump station has a pumping capacity of 6.7 cfs.

The original Project concept included a series of infiltration drywells installed along Parkview Lane that would divert water from an adjacent storm drain line. However, following the geotechnical and environmental investigation, it was determined that deep infiltration would not be feasible within the Project area due to nearby historical soil and groundwater contamination.

The Project instead proposes to install stormwater detention best management practices (BMPs and retrofit the existing pond and pump sta tion at or adjacent to the Westdrift Golf Course (Golf Course). By detaining 5.42 acre-feet of stormwater runoff and releasing them 72 hours after the storm, the City will be ab le to utilize the downstream Alondra Park Stor mwater Capture Park ’s treatment capacity during dry weather to demonstrate compliance with the Beach Cities WMP RAA.

Geosyntec developed three project alternatives. Each project alternative is described in detail in the section below.

ALTERNATIVE 1
Alternative 1 proposes the construction of two (2) detention tanks with diversions from existing storm drains – one located at the parking lot at the corner of Parkview Ave & Village Dr and another located on the east side of the Golf Course. The detention tank under the parking lot would have a storage volume of 2 acre- feet. It would divert from an existing 39” RCP storm drain and reconnect to an existing City storm drain where runoff would flow towards a retrofitted pump station on the east side of the Golf Course. The detention tank within the Golf Course would have a storage volume of 1 acre-feet. It would divert from an existing 72” RCP storm drain and connect to the same retrofitted pump station. Alternative 1 also includes enhancing an existing lake on the southwest side of the Golf Course. The current storage capacity of this lake is 1.33 acre-feet. After regrading, it will accommodate an additional 1.22 acre-feet, resulting in a total storage capacity of

2.55 acre-feet.

Approximately 24 hours prior to a storm event, the southwest lake will be drained . During the storm event, stormwater will be diverted into the two detention tanks and into the southwest pond from the existing storm drains. C ollectively, these three detention features will detain up to 5.42 acre-feet of first flash runoff. Excess stormwater runoff beyond the detention capacity will bypass and flow into the existing pump station at the Golf Course. Approximately 72 hours after the storm event, the control system will be activated to release the detained runoff in the detention features Manhattan Beach Dominguez Channel Stormwater Infiltration Project Feasibility Study Summary Memo

Page 3 ends

MB Feasibility Study Summary Memo (2026-03-06).docx

back to the storm drains, allowing the m to reach the pump station. This runoff will eventually be conveyed to the downstream Alondra Park Stormwater Capture Project for treatment and reuse.

See Attachment 1, Exhibit 1 for the site plan for Alternative 1.

ALTERNATIVE 2
Alternative 2 proposes the construction of one (1) detention tank with diversion from an existing storm drain. The detention tank would be built on the east side of the Golf Course with a diversion from an existing 72” Reinforced Concrete Pipe (RCP) storm drain and a storage volume of 3 acre- feet. The detention tank would flow into a retrofitted pump station, which would flow towards a diversion facility downstream. Alternative 2 also includes enhancing the existing water pond on the southwest side of the Golf Course. similar to Alternative 1.

Approximately 24 hours prior to a storm event, the southwest lake will be drained . During the storm event, stormwater will be diverted into the detention tank and into the southwest pond from the existing storm drains. Collectively, these two detention features will detain up to 5.42 acre-feet of first flash runoff. Excess stormwater runoff beyond the detention capacity will bypass and flow into the existing pump station at the Golf Course . Approximately 72 hours after the storm event, the control system will be activated to release the detained runoff in the detention features back to the storm drains, allowing them to reach the pump station. This runoff will eventually be conveyed to the downstream Alondra Park Stormwater Capture Project for treatment and reuse.

See Attachment 1, Exhibit 2 for the site plan for Alternative 2.

ALTERNATIVE 3
Alternative 3 proposes the regrading of an area within the center of Golf Course to create a dry detention pond. This pond would have a cumulative storage volume of 3.43 acre-feet. Alternative 3 also includes enhancing the existing pond on the southwest side of the Golf Course , similar to Alternative 1.

Approximately 24 hours prior to a storm event, the southwest lake will be drained . During the storm event, stormwater will be diver ted into the dry weather pond and into the southwest pond from the existing storm drains. C ollectively, these two detention features will detain up to 5.42 acre-feet of first flash runoff. Excess stormwater runoff beyond the detention capacity will bypass and flow into the existing pump station at the Golf Course. Approximately 72 hours after the storm event, the control system will be activated to release the detained runoff in the detention features back to the storm drains, allowing the m to reach the pump station. This runoff will eventually be conveyed to the downstream Alondra Park Stormwater Capture Project for treatment and reuse.

See Attachment 1, Exhibit 3 for the site plan for Alternative 3.

Manhattan Beach Dominguez Channel Stormwater Infiltration Project Feasibility Study Summary Memo

Page 4 ends

MB Feasibility Study Summary Memo (2026-03-06).docx

ALTERNATIVE COMPARISON
Table 1 provides a qualitative comparison among the three alternatives. All three alternatives can provide 5.42 ac-ft of 24-hour stormwater management capacity and therefore meet the WMP RAA compliance metrics. In addition, all three alternatives include the same pump retrofit configuration to effectively drawdown the standing water in the golf course in less than 72 hours during a 10- year design storm. While quantitative cost opinions have not been developed for the alternatives, the construction and O&M cost can be compared relatively based on the proposed features. Both Alternatives 1 and 2 require significant excavation and concrete work to build the underground detention tank(s), and therefore will be significantly more expensive than alternative 3 to construct.

The O&M cost for Alternative 1 will be higher than that for Alternatives 2 and 3 because it has an additional O&M point at the parking lot at the corner of Parkview Ave & Village Dr.

Table 1. Alternative Comparison
WMP
Compliance
Flooding
Mitigation
Construction
Cost O&M Cost
Alternative 1   $$$ $$
Alternative 2   $$ $
Alternative 3   $ $

CONCLUSIONS AND RECOMMENDATIONS
Geosyntec completed a BMP feasibility study for the Manhattan Beach Dominguez Channel Infiltration Project. The study resulted in three alternatives that can provide the required 5.42 acre-feet of 24-hour stormwater management capacity, and therefore demonstrate compliance to the Beach Cities WMP RAA for the Dominguez Channel Watershed.

Based on the study, Geosyntec recommended proceeding with Alternative 3, which consists of regrading an area within the center of Golf Course to create a dry detention pond, and enhance the existing pond on the southwest side of the Golf Course. This alternative represents the most cost competitive option among the three alternatives while meeting both water quality and flood mitigation design criteria.

Per the approved Project scope of work, Geosyntec will proceed with developing a Safe Clean Water (SCW) Program feasibility study to apply for design and construction phase fundings based on the selected alternative in July 2026.

Manhattan Beach Dominguez Channel Stormwater Infiltration Project Feasibility Study Summary Memo

Page 5 ends

MB Feasibility Study Summary Memo (2026-03-06).docx

REFERENCE
Geosyntec, 2024. Updated Beach Cities Watershed Management Program.

Geosyntec, 2025a. Geotechnical Data Report for Manhattan Beach Dominguez Channel Stormwater Infiltration Project
Geosyntec, 2025b. Manhattan Beach Dominguez Channel Stormwater Infiltration Project Hydrology Analysis
Manhattan Beach Dominguez Channel Stormwater Infiltration Project Feasibility Study Summary Memo

Page 6 ends

MB Feasibility Study Summary Memo (2026-03-06).docx

ATTACHMENT 1 – ALTERNATIVE

EXHIBITS

EEEEEEE
EEEEEE
EEEEEE

EEEEEEE EE
OHE
OHE

OHEOHEOHE
OHE
OHE

EEEEEEEE EEEEEEEEEEEEEEEEEEEEEE
EEEEE
E EEE
EEEE

EEEEEEEEE

EEEEEEEEEEEE
EE

E EEEEEEEEE

EEEEEEEE SS SSSSSS SSSS
SS
SS
SSSS
S
S
S
S S S
S
S
S
S
S
S
S
S
S
S
S
S
SS

SDSDSDSD
SDSDSD

SDSDSDSDSD
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S

SDSDSDSDSDSDSD

SDSDSDSDSD
SD

40.13'PENDING AS-BUILTFROMCITY OF MANHATTAN BEACH
EG = 87.0SD INV = 77.0
80'SCE EASEMENTEG = 78.0SD INV = 74.2
EG = 123.5SD INV = 112.8PARKVIEW AVEROSECRANS AVE

VILLAGE DR

MB MARRIOTT DR

REDONDO AVE

MARKET PL

PARKVIEW AVENUECITY OF MANHATTAN BEACH PARKING LOTMANHATTAN BEACH COUNTRY CLUB TENNIS COURTS DETENTION TANK (2 AC-FT)
PROPOSED DIVERSIONFROM CITY STORM DRAIN39" RCPSD INV = 112.8 PROPOSEDSTORM DRAINPROPOSED STORM DRAINPROPOSEDSTORM DRAINEG = 96.0 CONNECTION TO EXCITY STORM DRAIN24" RCPSD INV = 77.0
EG = 121.0
8'2' MININV = 85.0
BASE SCOPE -EXISTING LAKE ENHANCEMENTALTERNATIVE 1 -GOLF COURSE DETENTIONTANK (1-AC FT)ALTERNATIVE 1 -PARKING LOT DETENTION TANK(2-AC FT) ALTERNATIVE 1 -CONNECTION TO EXISTING CITYSTORM DRAINCURRENT STORAGEVOLUME = 1.33 AC-FT ALTERNATIVE 1 -STORM DRAIN DIVERSION(39" RCP)
INLET STRUCTUREINV = 51.8INLET STRUCTUREINV 51.5BASE SCOPE -MODIFIED OUTLETSTRUCTURE ADD'L VOLUMEREQUIRED: 1.22 AC-FT
SD INV 51.0
ALTERNATIVE 1 - STORMDRAIN DIVERSION (72" RCP)ALTERNATIVE 1 - STORMDRAIN CONNECTION TOPUMP STATION

BASE SCOPE - REROUTE STORMDRAIN CONNECTION TO EX LAKE
ALTERNATIVE 1 -REMOVE EXISTINGSTORM DRAIN

EEEEEEEEEEEE EEEEEEEEEEEEEEE EEEEEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE E

EEEEEEEEEEEEEEEEEEEE

EEEEEEEEEEE

EEEEEEEEEEEEEE

EEEEEEEEEEEEEEEEEE

EEEEEEEEEEEEEEEEEEEEE
EEEE

EEEEEEEEEEEEEEEEEEEEEEEE

EEEEEEEE
E
EEEEE
EE

SSSS SSSS

SSSSSSSS
SS
SS
SSSSSS
SS
SS
S
S
S
S
S
S
S
S
SS
SD

SDSDSDSDSDSDSDSD

SDSDSDSDSDSD
SD

SDSDSDSDSDSDSDSDSD
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
S
S
S
S
S
S
S
S
SSS
S

SDSDSDSDSDSDSDSD
SDSD

SD SDSDSD
SD
SD
SD

EEEEEEEEEEEE EEEEEEEEEEEEEEE EEEEEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE E

EEEEEEEEEEEEEEEEEEEE

EEEEEEEEEEE

EEEEEEEEEEEEEE

EEEEEEEEEEEEEEEEEE

EEEEEEEEEEEEEEEEEEEEE
EEEE

EEEEEEEEEEEEEEEEEEEEEEEE

EEEEEEEE
E
EEEEE
EE

SSSS SSSS

SSSSSSSS
SS
SS
SSSSSS
SS
SS
S
S
S
S
S
S
S
S
SS
SD

SDSDSDSDSDSDSDSD

SDSDSDSDSDSD
SD

SDSDSDSDSDSDSDSDSD
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
S
S
S
S
S
S
S
S
SSS
S

SDSDSDSDSDSDSDSD
SDSD

SD SDSDSD
SD
SD
SD

40.13'
80'SCE EASEMENT
ALTERNATIVE 2 -GOLF COURSE DETENTIONTANK (3-AC FT)
BASE SCOPE -EXISTING LAKE ENHANCEMENTCURRENT STORAGEVOLUME = 1.33 AC-FT ALTERNATIVE 2 -REMOVE EXISTINGSTORM DRAIN
SD INV 51.0
INLET STRUCTUREINV = 51.8INLET STRUCTUREINV 51.5

BASE SCOPE -MODIFIED OUTLETSTRUCTURE
ALTERNATIVE 2 - STORMDRAIN DIVERSION (72" RCP)ALTERNATIVE 2 - STORMDRAIN CONNECTION TOPUMP STATION BASE SCOPE - REROUTE STORMDRAIN CONNECTION TO EX LAKEADD'L VOLUMEREQUIRED: 1.22 AC-FT

EEEEEEEEEEEE EEEEEEEEEEEEEEE EEEEEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE E

EEEEEEEEEEEEEEEEEEEE

EEEEEEEEEEE

EEEEEEEEEEEEEE

EEEEEEEEEEEEEEEEEE

EEEEEEEEEEEEEEEEEEEEE
EEEE

EEEEEEEEEEEEEEEEEEEEEEEE

EEEEEEEE
E
EEEEE
EE

SSSS SSSSSSSSSS
SS
SS
SS
SSSSSS
SS
SS
S
S
S
S
S
S
S
S
SS
SD

SDSDSDSDSDSDSDSD

SDSDSDSDSDSD
SD

SDSDSDSDSDSDSDSDSD
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
S
S
S
S
S
S
S
S
S
SSS
S

SDSDSDSDSDSDSDSD
SDSD

SD SDSDSD
SD
SD
SD

40.13'
80'SCE EASEMENT

PARKVIEW AVE
ALTERNATIVE 3 -GOLF COURSE REGRADINGELEV 63CUMULATIVE CURRENT STORAGE VOLUME= 3.43 AC-FTREQUIRED ALTERNATIVE 3 STORAGEVOLUME = 3 AC-FTELEV 60CURRENT STORAGE VOLUME = 0.96 AC-FTBASE SCOPE -EXISTING LAKE ENHANCEMENTCURRENT STORAGEVOLUME = 1.33 AC-FT EXISTING 72" OUTLETSTRUCTURE
SD INV 51.0
INLET STRUCTUREINV = 51.8INLET STRUCTUREINV 51.5
BASE SCOPE -MODIFIED OUTLETSTRUCTUREBASE SCOPE - REROUTE STORMDRAIN CONNECTION TO EX LAKEADD'L VOLUMEREQUIRED: 1.22 AC-FT