ATTACHMENT 2
GSE CONSTRUCTION INC. DATE: 7/29/2022
Manteca WQCF Bar Screen Phase 1 Project GSE PCO #006
PROJECT No. : 816 CLIENTS PCO # 2
CHANGE ORDER CALCULATION
BRIEF DESCRIPTION OF CHANGE
Labor + Surcharge D I R E C T C O S T S TOTAL
DIRECT
DESCRIPTION QUANTITY UNIT EQUIP. MATERIAL LABOR SUB HOURS RATE EQUIP. MATERIAL LABOR SUB TOTAL COST Material (Mona Composites)
Additional FRP Support (FRP C8 x 3/8” Channel & L4 x 4 x ½” Angle) 1 LS $0 $1,230.00 0 $ - 0.0 0.00 $0.00 $1,230.00 $0 $0 $1,230 Installation
Field measurement 2 Hrs $0 $500.00 3 $ - 6.0 10.79 $0.00 $500.00 $65 $0 $565 Install additional FRP Support w/New anchor 12 Hrs $0 $500.00 3 $ - 36.0 106.70 $0.00 $500.00 $3,841 $0 $4,341 Project Engineer (Gather quote & info) 2 Hrs $0 $0.00 1 $ - 2.0 80.38 $0.00 $0.00 $161 $0 $161 Sales tax 8.250 % $183.98 $184
TOTALS 44.0 $92.43 $0 $2,413.98 $4,067 $0 $6,481
MARKUP EQUIPMENT 15 % $0 $0
MARKUP MATERIALS 15 % $362 $362
MARKUP ON LABOR 15 % $610 $610
MARKUP SUBCONTRACTS 5 % $0 $0
INSURANCE (all risk) 1 % $75
TOTAL CHANGE COST $7,527
UNIT PRICES
Supply & replace the existing grating supports with FRP supports under the manway door. GSE will use the existing anchors if aligned with the new installation otherwise will install new anchors. Addtional Support for New Grating ATTACHMENT 2
Quotation prepared by: Moosa Raza 1
QUOTE Date: July 29th, 2022
Quote#: SO#: 3494
Expiration Date: 60 days
TO: Behzad Nazari @ GSE Constructions
SALESREP PROJECT PAYMENT TERMS ESTIMATOR
MRD Manteca Wastewater Quality Control
Facility Phase III Expansion Net 30 Moosa Raza
SCOPE OF WORK
Mona Composites LLC, MBE is pleased to quote FRP Beams & Angles. Our takeoff is based on email provide by your firm on 07/26/2022, and is as follows:
1. (5) 5’ – 0” long sticks of FRP C8 x 3/8” Channel. Resin is VEFR. Color is BEIGE.
2. (2) 5’ – 0” long sticks of FRP L4 x 4 x ½” Angle. Resin is VEFR. Color is BEIGE.
TOTAL PROJECT WEIGHT: 120 LBS
PROJECT PRICE: $845.00
ESTIMATED PROJECT S&H: $385.00
BASED ON 1 SHIPMENT
.
.
NOTES:
1. Drafting Lead Time = N/A
2. Fabrication Lead Time = 2 – 3 Weeks ARO
3. Estimated S&H is quoted above. S&H charges may vary at the time of shipment. 5802 Parkersburg Drive
Houston, TX 77036
TEL: 832-831-9828
FAX: 832-831-9829
EMAIL: [email protected]
Certified MBE
ATTACHMENT 2
Quotation prepared by: Moosa Raza 2
STANDARD TERMS & CONDITIONS:
This is a quotation on the goods named, subject to the conditions noted below.
4. Mona Composites standard fabrication & manufacturing tolerances will apply as follows:
5. Structural members +/- 1/8”
6. Grating +/- ¼”
7. Cut grating may have open stub bars
8. Mona Composites, LLC, MBE will provide the materials described in the “Scope of Work” per its own design.
9. Mona Composites, LLC, MBE reserves the right to a final review of its quotation prior to accepting a purchase order.
10. All prices become subject to escalation 1 year after purchase order is received.
To accept this quotation, sign here and return: _____________________________________________________________ Thank you for your business!
ATTACHMENT 2
R:\MANTECA\BAR SCREEN\CONSTRUCTION\PCOS\MT-BAR-PCO-06.DOC 1 of 1
PROPOSED CHANGE ORDER
PROJECT TITLE: City of Manteca WQCF
WQCF Bar Screen Project
GSE Construction Company Inc.
DATE: 07/14/22
JOB NUMBER: 2020-142 T02
PCO NUMBER: PCO-06
SUBJECT: Repair of Grating supports at Manway
REVIEWED BY: GPH
______________________________________________________________________________ Work Description:
The grating supports under the manway door have been severely damaged by corrosion. See attached photo.
Please provide a cost to replace the existing grating supports with FRP supports.
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
GSE CONSTRUCTION INC. DATE: 7/5/2022
Manteca WQCF Bar Screen Phase 1 Project GSE PCO #003
PROJECT No. : 816 CLIENTS PCO # 1
CHANGE ORDER CALCULATION
BRIEF DESCRIPTION OF CHANGE
Labor + Surcharge D I R E C T C O S T S TOTAL
DIRECT
DESCRIPTION QUANTITY UNIT EQUIP. MATERIAL LABOR SUB HOURS RATE EQUIP. MATERIAL LABOR SUB TOTAL COST Telstar
Replace light bulbs 1 LS $0 $0.00 0 $ 2,740.00 0.0 0.00 $0.00 $0.00 $0 $2,740 $2,740 Project Engineer (Gather quotes & docs) 2 Hrs $0.00 1 $ - 2.0 80.38 $0.00 $0.00 $161 $0 $161 Sales tax 8.250 % $0.00 $0
TOTALS 2.0 $80.38 $0 $0.00 $161 $2,740 $2,901
MARKUP EQUIPMENT 15 % $0 $0
MARKUP MATERIALS 15 % $0 $0
MARKUP ON LABOR 15 % $24 $24
MARKUP SUBCONTRACTS 5 % $137 $137
INSURANCE (all risk) 1 % $31
TOTAL CHANGE COST $3,092
UNIT PRICES
Replacement existing light bulbs with LED light bulbs in Headwork Bldg per below total light bulb count:
• (6) LED bulbs into existing type P2 fixtures
• (3) 5.5 PLH LED bulbs into existing type R1 fixtures
• (2) T8 LED bulbs into existing type G fixtures
Replace Lights in Headworks
ATTACHMENT 2
Contractor License #422364
Contractor DIR #1000000899
CONTROL SYSTEM INTEGRATION • INSTRUMENTATION SERVICES
SCADA/AUTOMATION • PLC/HMI • ELECTRICAL • CALIBRATION • MAINTENANCE 1717 Solano Way, Unit 34, Concord, CA 94520 Phone 925-671-2888, Fax 925-671-9507 4017 Vista Park Court, Sacramento, CA 95834 Phone 916-646-1999, Fax 916-646-1096 202 South Douty Street, Hanford, CA 93230 Phone 559-584-7116, Fax 559-584-8028
May 3, 2022
GSE Construction
[email protected]
Attn: Behzad Nazari, Josette Felver
Subject: City of Manteca / WQCF Bar Screen Project/ Bar Screen No. 2 Reference: SR 30-38553 PCO-02
Drawings: MT-BAR-PCO-02
Specifications: N/A
Dear Behzad,
Telstar Instruments (“Telstar”) is pleased to provide a quote for the referenced project to the above identified purchaser (“Customer”).
By accepting this proposal from Telstar, you agree to treat this as confidential information.
SCOPE OF SERVICES
1. Telstar will provide and install two (2) T8 LED bulbs into existing type G fixtures.
2. Telstar will provide and install three (3) 5.5 PLH LED bulbs into existing type R1 fixtures.
3. Telstar will provide and install six (6) LED bulbs into existing type P2 fixtures.
Lump Sum Price for this Scope..............................................................................................$ 2,740.00 Shipping and Handling for Telstar Supplied Materials IS INCLUDED Sales Tax IS INCLUDED
This quotation is based on Customer’s representation that this IS a prevailing wage project.
CLARIFICATIONS, EXCEPTIONS, AND EXCLUSIONS
a. Manufacturer Lead Time: 4-10 weeks ARO.
b. All work is assumed to be in areas not considered to be confined space. All required confined space permitting, training, monitoring, and hole watch is not included. c. Material price is valid for seven (7) days from date referenced on this quote (Refer to COVID clause RE: MATERIAL PRICING AND DELIVERY under Terms and Conditions) d. This quotation is based on the inclusion of Telstar’s standard Terms and Conditions as part of any purchase order, contract or other agreement.
ATTACHMENT 2
Contractor License #422364
Contractor DIR #1000000899
CONTROL SYSTEM INTEGRATION • INSTRUMENTATION SERVICES
SCADA/AUTOMATION • PLC/HMI • ELECTRICAL • CALIBRATION • MAINTENANCE
e. Telstar’s quotation includes only those items listed above. Requests for additions/deletions from our scope will require a change in the quoted price. f. Telstar assumes no responsibility for performance, applicability, compatibility, start-up, testing, or acceptance of any equipment not furnished by Telstar under this proposal. g. Telstar is supplying only equipment specified and noted above. h. Please reference the above stated quote number in all correspondence and purchase orders.
TERMS AND CONDITIONS
Base Terms: Quotation is valid for 30 days from the date of Telstar’s quotation. Payment is due and payable 30 days from date of invoice. If payment is not received by the 30th day, a .05% daily service charge (18-3/4% per annum) will be charged on all accounts past due. In the event of a dispute concerning payment, attorney's fees, court costs and costs of collection will be paid to the prevailing party. The cost for permits and bonding are excluded unless expressly referenced in Telstar’s quotation. Our standard insurance applies unless agreed to in writing by Telstar.
Telstar’s standard one year parts only warranty applies to this quotation. All other warranties, express or implied, or referenced elsewhere in contract documents are excluded, including but not limited to implied warranties of merchantability or fitness for purpose. Unless expressly stated in Telstar’s estimate, this quote is based on standard straight time hours and does not include any prevailing wage rates. The price quoted herein is for the labor and materials specifically listed within the body of this quote. Service calls are charged at a 4-hour minimum per person, excluding travel time. Unless expressly stated in the quotation, training, operation and maintenance manuals, and preparation of as built drawings are excluded from Telstar’s scope of work.
Limitation of Liability: (a) In no event shall Telstar, its suppliers or subcontractors be liable for special, indirect, incidental or consequential damages, whether in contract, warranty, tort, negligence, strict liability or otherwise, including, but not limited to, loss of profits or revenue, loss of use of the Equipment or any associated equipment, cost of capital, cost of substitute equipment, facilities or services, downtime costs, delays, and claims of customers of Customer, its officers, directors, members employees or any third parties for any damages. Telstar’s liability for any claim whether in contract, warranty, tort, negligence, strict liability, or otherwise for any loss or damage arising out of, connected with, or resulting from this Agreement or the performance or breach thereof, or from the design, manufacture, sale, delivery, resale, repair, replacement, installation, technical direction of installation, inspection, operation or use of any equipment covered by or furnished under this Agreement, or from any services rendered in connection therewith, shall in no case exceed twenty-five percent (25%) of the purchase price allocable to the Equipment, part or Services that is the subject of the claim. (b) All causes of action against Telstar Instruments arising out of or relating to this Agreement or the performance or breach hereof shall are deemed barred unless brought within one year from the date of discovery or other accrual. (c) In no event, regardless of cause, shall Telstar Instruments be liable for liquidated damages, offsets or penalties of any kind or to indemnify, defend or hold harmless Customer, its officers, directors, members, employees or any third party, arising from or related to the Equipment and/or Services provided by Telstar.
Force Majeure: Telstar shall neither be liable for loss, damage, detention or delay nor be deemed to be in default for failure to perform when prevented from doing so by causes beyond its reasonable control including but not limited to acts of war (declared or undeclared), Acts of God, fire, strike, labor difficulties, acts or omissions of any governmental authority or of Customer, compliance with government regulations, insurrection or riot, embargo, delays or shortages in transportation or inability to obtain necessary labor, materials, or manufacturing facilities from usual sources or from defects or delays in the performance of its suppliers or subcontractors due to any of the foregoing enumerated causes. In the event of delay due to any such cause, the date of delivery will be extended by period equal to the delay plus a reasonable time to resume production, and the price will be adjusted to compensate Telstar Instruments for such delay.
ATTACHMENT 2
Contractor License #422364
Contractor DIR #1000000899
CONTROL SYSTEM INTEGRATION • INSTRUMENTATION SERVICES
SCADA/AUTOMATION • PLC/HMI • ELECTRICAL • CALIBRATION • MAINTENANCE
Cancellation: In the event of cancellation by Customer, Customer agrees to fully reimburse and compensate Telstar for all costs associated with this Quotation or subsequent order, including but not limited to engineering, labor, materials, quote and estimating time, and product return fees, plus a ten percent (10%) markup to compensate for disruption in scheduling, planned production, indirect costs and profit. Payment for cancellation shall be due within ten (10) days from the date of submission of charges by Telstar.
Entire Agreement: This Quotation constitutes the entire agreement between Telstar and Customer. There are no agreements, understandings, restrictions, warranties, or representations between Telstar and Customer other than those set forth herein or herein provided. This Quotation may only be amended, changed or revised by a written amendment signed by an authorized representative of Telstar. No oral or implied agreements shall be of any force or affect.
Precedence: In the event Telstar is issued an authorization for work, Purchase Order, Contract or similar Agreement with conflicting Terms and Conditions than those set forth herein, these Terms and Conditions will take precedence and will supersede any and all other conflicting Terms and Conditions.
Submittals: In the event Telstar receives a Notice to Proceed or a written statement to proceed with submittals, Telstar will be entitled to compensation based on percent of completion of submittal cost to Customer. Telstar will prepare only one set of submittals, and any resubmittals shall be subject to an additional charge for engineering time and other costs in preparing re-submittals.
Prevailing Wages: Telstar relies upon Customer’s representations as to whether this Project requires payment of prevailing wages. Customer agrees to defend, indemnify and hold Telstar harmless from and against any and all claims, actions and demands, including but not limited to payment of legal fees, fines, back pay, and any penalties or interest, associated with Customer’s inaccurate representation of whether prevailing wages are required to be paid.
TELSTAR’S COVID AND INDUSTRY CLAUSE RE: MATERIAL PRICING AND DELIVERY: Telstar is unable to hold prices on materials for more than 7 days. Prices for plastic, copper, steel, and other commodities fluctuate daily. Our vendors and manufacturers are experiencing unprecedented delays due to COVID-19 staffing, a shortage of containers, port congestion, and raw material shortages that have extended lead times significantly. Telstar reserves the right to amend the delivery date and the price of materials set forth in this quotation. Telstar considers any of the above related changes imposed by our vendors and manufacturers as outside its reasonable control and subject to Force Majeure provisions.
We look forward to working with you on this project. If you have any questions, please contact me at the phone number below.
Sincerely,
Dalal Muqatash
Project Manager
Telstar Instruments
(916) 646-1999
ATTACHMENT 2
R:\MANTECA\BAR SCREEN\CONSTRUCTION\PCOS\MT-BAR-PCO-03.DOC 1 of 1
PROPOSED CHANGE ORDER
PROJECT TITLE: City of Manteca WQCF
WQCF Bar Screen Project
GSE Construction Company Inc.
DATE: 06/21/22
JOB NUMBER: 2020-142 T02
PCO NUMBER: PCO-03
SUBJECT: Replace Lights in Headworks
REVIEWED BY: GPH
______________________________________________________________________________ Work Description:
The City has experienced complete failure of lighting at the headworks area. Note 7 on Drawing E-310-C requires the Contractor to replace 5 of the existing light bulbs with LED light bulbs.
However, there are many more lights that need replacement. Therefore, the City requests a cost proposal from GSE for replacement of all of the additional light bulbs with LED lights bulbs at the headworks as shown on the attached drawings and as follows.
Total light bulb count
• (12) - P2 fixture - Surface wall pack – 1 lamp (150-watt HPS, 150LV). • (3) - R1 fixture - Vapor tight fluorescent ceiling mount • (2) – G fixture - 6” x 4’ wet location fluorescent – 2 lamps (F32TB).
Telstar included (6) P2 fixture bulbs in the base contract.
Remaining bulbs that need replacement under this PCO.
• (6) LED bulbs into existing type P2 fixtures
• (3) 5.5 PLH LED bulbs into existing type R1 fixtures
• (2) T8 LED bulbs into existing type G fixtures
Telstar has provided the attached quote and documentation to replace the remaining light bulbs.
Telstar Quote is $2,740.
Please provide GSE markup and final cost for this PCO-03.
ATTACHMENT 2
Contractor License #422364
Contractor DIR #1000000899
CONTROL SYSTEM INTEGRATION • INSTRUMENTATION SERVICES
SCADA/AUTOMATION • PLC/HMI • ELECTRICAL • CALIBRATION • MAINTENANCE 1717 Solano Way, Unit 34, Concord, CA 94520 Phone 925-671-2888, Fax 925-671-9507 4017 Vista Park Court, Sacramento, CA 95834 Phone 916-646-1999, Fax 916-646-1096 202 South Douty Street, Hanford, CA 93230 Phone 559-584-7116, Fax 559-584-8028
May 3, 2022
GSE Construction
[email protected]
Attn: Behzad Nazari, Josette Felver
Subject: City of Manteca / WQCF Bar Screen Project/ Bar Screen No. 2 Reference: SR 30-38553 PCO-02
Drawings: MT-BAR-PCO-02
Specifications: N/A
Dear Behzad,
Telstar Instruments (“Telstar”) is pleased to provide a quote for the referenced project to the above identified purchaser (“Customer”).
By accepting this proposal from Telstar, you agree to treat this as confidential information.
SCOPE OF SERVICES
1. Telstar will provide and install two (2) T8 LED bulbs into existing type G fixtures.
2. Telstar will provide and install three (3) 5.5 PLH LED bulbs into existing type R1 fixtures.
3. Telstar will provide and install six (6) LED bulbs into existing type P2 fixtures.
Lump Sum Price for this Scope..............................................................................................$ 2,740.00 Shipping and Handling for Telstar Supplied Materials IS INCLUDED Sales Tax IS INCLUDED
This quotation is based on Customer’s representation that this IS a prevailing wage project.
CLARIFICATIONS, EXCEPTIONS, AND EXCLUSIONS
a. Manufacturer Lead Time: 4-10 weeks ARO.
b. All work is assumed to be in areas not considered to be confined space. All required confined space permitting, training, monitoring, and hole watch is not included. c. Material price is valid for seven (7) days from date referenced on this quote (Refer to COVID clause RE: MATERIAL PRICING AND DELIVERY under Terms and Conditions) d. This quotation is based on the inclusion of Telstar’s standard Terms and Conditions as part of any purchase order, contract or other agreement.
ATTACHMENT 2
Contractor License #422364
Contractor DIR #1000000899
CONTROL SYSTEM INTEGRATION • INSTRUMENTATION SERVICES
SCADA/AUTOMATION • PLC/HMI • ELECTRICAL • CALIBRATION • MAINTENANCE
e. Telstar’s quotation includes only those items listed above. Requests for additions/deletions from our scope will require a change in the quoted price. f. Telstar assumes no responsibility for performance, applicability, compatibility, start-up, testing, or acceptance of any equipment not furnished by Telstar under this proposal. g. Telstar is supplying only equipment specified and noted above. h. Please reference the above stated quote number in all correspondence and purchase orders.
TERMS AND CONDITIONS
Base Terms: Quotation is valid for 30 days from the date of Telstar’s quotation. Payment is due and payable 30 days from date of invoice. If payment is not received by the 30th day, a .05% daily service charge (18-3/4% per annum) will be charged on all accounts past due. In the event of a dispute concerning payment, attorney's fees, court costs and costs of collection will be paid to the prevailing party. The cost for permits and bonding are excluded unless expressly referenced in Telstar’s quotation. Our standard insurance applies unless agreed to in writing by Telstar.
Telstar’s standard one year parts only warranty applies to this quotation. All other warranties, express or implied, or referenced elsewhere in contract documents are excluded, including but not limited to implied warranties of merchantability or fitness for purpose. Unless expressly stated in Telstar’s estimate, this quote is based on standard straight time hours and does not include any prevailing wage rates. The price quoted herein is for the labor and materials specifically listed within the body of this quote. Service calls are charged at a 4-hour minimum per person, excluding travel time. Unless expressly stated in the quotation, training, operation and maintenance manuals, and preparation of as built drawings are excluded from Telstar’s scope of work.
Limitation of Liability: (a) In no event shall Telstar, its suppliers or subcontractors be liable for special, indirect, incidental or consequential damages, whether in contract, warranty, tort, negligence, strict liability or otherwise, including, but not limited to, loss of profits or revenue, loss of use of the Equipment or any associated equipment, cost of capital, cost of substitute equipment, facilities or services, downtime costs, delays, and claims of customers of Customer, its officers, directors, members employees or any third parties for any damages. Telstar’s liability for any claim whether in contract, warranty, tort, negligence, strict liability, or otherwise for any loss or damage arising out of, connected with, or resulting from this Agreement or the performance or breach thereof, or from the design, manufacture, sale, delivery, resale, repair, replacement, installation, technical direction of installation, inspection, operation or use of any equipment covered by or furnished under this Agreement, or from any services rendered in connection therewith, shall in no case exceed twenty-five percent (25%) of the purchase price allocable to the Equipment, part or Services that is the subject of the claim. (b) All causes of action against Telstar Instruments arising out of or relating to this Agreement or the performance or breach hereof shall are deemed barred unless brought within one year from the date of discovery or other accrual. (c) In no event, regardless of cause, shall Telstar Instruments be liable for liquidated damages, offsets or penalties of any kind or to indemnify, defend or hold harmless Customer, its officers, directors, members, employees or any third party, arising from or related to the Equipment and/or Services provided by Telstar.
Force Majeure: Telstar shall neither be liable for loss, damage, detention or delay nor be deemed to be in default for failure to perform when prevented from doing so by causes beyond its reasonable control including but not limited to acts of war (declared or undeclared), Acts of God, fire, strike, labor difficulties, acts or omissions of any governmental authority or of Customer, compliance with government regulations, insurrection or riot, embargo, delays or shortages in transportation or inability to obtain necessary labor, materials, or manufacturing facilities from usual sources or from defects or delays in the performance of its suppliers or subcontractors due to any of the foregoing enumerated causes. In the event of delay due to any such cause, the date of delivery will be extended by period equal to the delay plus a reasonable time to resume production, and the price will be adjusted to compensate Telstar Instruments for such delay.
ATTACHMENT 2
Contractor License #422364
Contractor DIR #1000000899
CONTROL SYSTEM INTEGRATION • INSTRUMENTATION SERVICES
SCADA/AUTOMATION • PLC/HMI • ELECTRICAL • CALIBRATION • MAINTENANCE
Cancellation: In the event of cancellation by Customer, Customer agrees to fully reimburse and compensate Telstar for all costs associated with this Quotation or subsequent order, including but not limited to engineering, labor, materials, quote and estimating time, and product return fees, plus a ten percent (10%) markup to compensate for disruption in scheduling, planned production, indirect costs and profit. Payment for cancellation shall be due within ten (10) days from the date of submission of charges by Telstar.
Entire Agreement: This Quotation constitutes the entire agreement between Telstar and Customer. There are no agreements, understandings, restrictions, warranties, or representations between Telstar and Customer other than those set forth herein or herein provided. This Quotation may only be amended, changed or revised by a written amendment signed by an authorized representative of Telstar. No oral or implied agreements shall be of any force or affect.
Precedence: In the event Telstar is issued an authorization for work, Purchase Order, Contract or similar Agreement with conflicting Terms and Conditions than those set forth herein, these Terms and Conditions will take precedence and will supersede any and all other conflicting Terms and Conditions.
Submittals: In the event Telstar receives a Notice to Proceed or a written statement to proceed with submittals, Telstar will be entitled to compensation based on percent of completion of submittal cost to Customer. Telstar will prepare only one set of submittals, and any resubmittals shall be subject to an additional charge for engineering time and other costs in preparing re-submittals.
Prevailing Wages: Telstar relies upon Customer’s representations as to whether this Project requires payment of prevailing wages. Customer agrees to defend, indemnify and hold Telstar harmless from and against any and all claims, actions and demands, including but not limited to payment of legal fees, fines, back pay, and any penalties or interest, associated with Customer’s inaccurate representation of whether prevailing wages are required to be paid.
TELSTAR’S COVID AND INDUSTRY CLAUSE RE: MATERIAL PRICING AND DELIVERY: Telstar is unable to hold prices on materials for more than 7 days. Prices for plastic, copper, steel, and other commodities fluctuate daily. Our vendors and manufacturers are experiencing unprecedented delays due to COVID-19 staffing, a shortage of containers, port congestion, and raw material shortages that have extended lead times significantly. Telstar reserves the right to amend the delivery date and the price of materials set forth in this quotation. Telstar considers any of the above related changes imposed by our vendors and manufacturers as outside its reasonable control and subject to Force Majeure provisions.
We look forward to working with you on this project. If you have any questions, please contact me at the phone number below.
Sincerely,
Dalal Muqatash
Project Manager
Telstar Instruments
(916) 646-1999
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
FLEXCOLOR SHOE BOX / WALL PACK SCREW-IN
RETROFITS
ALSO WORKS
ON 208V & 240V
INSTALL
METHOD MEDIUM +
MOGUL BASE
ACTIVE
COOLING CRI
80+
OPERATING
TEMP
-40°F TO 122°F
L70/L90
50,000hrs
RATED LIFE SURGE
PROTECTION
12.10.21 Information is subject to change without notice.
MOGUL OR 120V
MEDIUM BASE ONLY
rotatable
base
PART # UPC REPLACES WATTAGE LUMENS COLOR BASE DLC CODES LED-8087E345D-G4 844006074432 100W HID 30W 3500/4200/4300 3000K/4000K/5000K E26 N/A LED-8087M345D-G4 844006074456 100W HID 30W 3500/4200/4300 3000K/4000K/5000K EX39 P1CK54P3 LED-8088E345D-G4 844006074470 175W HID 50W 6400/6900/7200 3000K/4000K/5000K E26 N/A LED-8088M345D-G4 844006074494 175W HID 50W 6400/6900/7200 3000K/4000K/5000K EX39 P6YHOJXP LED-8089M345D-G4 844006074517 250W HID 80W 10600/10700/10800 3000K/4000K/5000K EX39 PE1R64EU LED-8090M345D-G4 844006074524 400W HID 110W 14500/15400/15700 3000K/4000K/5000K EX39 PTGQIRSF LED-8090M345D-G4-HV 844006074760 400W HID 110W 14500/15400/15700 3000K/4000K/5000K EX39 PLQZ2S2U 30W, 50W, 80W, and 110W models
replacing up to 400W HID.
Switch between 3000K, 4000K,& 5000K
right on the unit.
Light panel can rotate once the base is
tightened to direct light out of the fixture.
Includes a fan and thermal sensor to run
cool and ensure a long and bright life.
Enclosed fixture safe and approved for
damp locations.
LED-8090-HV: 277-480V.
(can be used on 347V)
Lamps dim to 50% by selecting “LO”
on the switch located on the top of the
lamp. (Stepped dimming with other wired control
communication by the onboard switch)
switch
between
color
temps
* See page 2 for 347 volt options for Canada.
Available from Major Electronix | [email protected] | 800-966-2345 | www.productsforautomation.com
ATTACHMENT 2
FLEXCOLOR SHOE BOX/WALL PACK SCREW-IN
RETROFITS
12.10.21 Information is subject to change without notice.
PART # UPC REPLACES WATTAGE LUMENS COLOR BASE DLC CODES LED-8087E345CD-G4 844006074425 100W HID 30W 3500/4200/4300 3000K/4000K/5000K E26 N/A LED-8087M345CD-G4 844006074449 100W HID 30W 3500/4200/4300 3000K/4000K/5000K EX39 PNARUA94 LED-8088E345CD-G4 844006074463 175W HID 50W 6400/6900/7200 3000K/4000K/5000K E26 N/A LED-8088M345CD-G4 844006074487 175W HID 50W 6400/6900/7200 3000K/4000K/5000K EX39 PLK1XZP2 LED-8089M345CD-G4 844006074500 250W HID 80W 10600/10700/10800 3000K/4000K/5000K EX39 PF34RTPP Available from Major Electronix | [email protected] | 800-966-2345 | www.productsforautomation.com
ATTACHMENT 2
Location Prepared By
[www] 08-09-2021 01:41:21
Project Name
Notes
General
Status Active
Watts 10.5W
Fluorescent Equivalent 25W/28W/32W
Volts 120V-277V
Ballast Type Type B
Shape T8
Base Medium Bi Pin
ANSI Base G13
Nominal Length 48.00
Finish Gloss White
CCT (Kelvin) 3500
Temperature Neutral White
CRI 82
Lumens 1700L
Beam Spread 210
Dimmable Non-Dimmable
Hours Rated 50000
Lamp Type T8
Technology LED
Electrical
Ballasting Requirements Ballast Bypass
Operating Frequency 50/60 Hz
Power Factor 0.9
THD 0.2
Operating Temperature -20C (-4F) to a maximum of +45C
(+113F)
Physical
MOL 47.78
MOD 1.1
Material Glass
Lens Finish Gloss White
Lens Material Glass
Housing Color White
Weight (lb.) 0.44
Additional Information
Warranty 5 Year Limited - T8 LED Bulbs -
Ballast Bypass
Compliance
Safety Listing cULus Classified
Location Rating Damp
Energy Star No
DLC Approved Yes
DLC ID PLY6NGSKA26H
California Status Lawful for sale
RoHS Compliant Yes
FCC Compliant Yes
NSF Approved Yes
SATCO S11961
10.5T8/LED/48-835/BP/SE-DE
ATTACHMENT 2
Copyright 2020 Satco Products, Inc.
All Rights Reserved
For More Information Visit:
http://www.satco.com/
ATTACHMENT 2
FEATURES
BYPASS AND HYBRID BYPASS PL
Built-in universal driver – Bypass installation operates directly on 120 – 277V line voltage Hybrid Bypass versions can also operate directly on most magnetic ballasts* Replace up to 42W CFL lamps with G24d, GX24d (2-pin), G24q & GX24q (4-pin) sockets Exceptional efficacy up to 129 LPW
Suitable for damp locations
Lamp ambient temperature: -4°F to 113°F (-20°C to 45°C) Fixture operating temperature: -4°F to 95°F (-20°C to 35°C) Rated lifetime (L70): 50,000hrs
5 year limited warranty**/ 10 year available
(see EXTENDED WARRANTIES table for information)
Project Name:
Part Number: Date:
Type:
SPECIFICATIONS
Product Model Equiv. Input
Voltage Wattage Lumens CRI Efficacy
(LPW)
Power
Factor Fixture Rating BeamAngle THD Base RotatableAngle 36639
36640
36641
98256
98257
98258
36086
34856
36642
36643
98399
98400
98401
98402
98385
98386
98387
98388
98389
98390
42W
42W
42W
42W
42W
42W
13W-18W
13W-18W
13W-18W
13W-18W
26W
26W
26W
26W
13W-18W
13W-18W
26W
26W
26W
26W
15.5 15.5
15.5 16.5
16.5 16.5
5.5 5.5
5.5 5.5
8 8
8 8
5.5 5.5
8.5 8.5
8.5 8.5
0.9 0.9
0.9 0.9
0.9 0.9
0.9 0.9
0.9 0.9
0.9 0.9
0.9 0.9
0.9 0.9
0.9 0.9
0.9 0.9
180°
180°
180°
180°
180°
180°
310°
310°
310°
310°
310°
310°
310°
310°
310°
310°
310°
310°
310°
310°
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
Non-Enclosed
82 82
82 82
82 82
82 82
82 82
82 82
82 82
82 82
82 82
82 82
CCT
3000K
3500K
4000K
3000K
3500K
4000K
2700K
3000K
3500K
4000K
2700K
3000K
3500K
4000K
3500K
4000K
2700K
3000K
3500K
4000K
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
<20%
110°
110°
110°
120°
120°
120°
110°
110°
110°
110°
110°
110°
110°
110°
120°
120°
120°
120°
120°
120°
1,850
1,950
2,000
1,800
1,850
1,900
550
550
600
620
870
920
920
950
600
620
950
1,000
1,000
1,020
119
126
129
109
112
115
100
100
109
113
109
115
115
119
109
113
112
118
118
120
15.5PLH/830/BYP/R
15.5PLH/835/BYP/R
15.5PLH/840/BYP/R
16.5PLV/830/BYP
16.5PLV/835/BYP
16.5PLV/840/BYP
5.5PLH/827/HYBM
5.5PLH/830/HYBM
5.5PLH/835/HYBM/R
5.5PLH/840/HYBM/R
8PLH/827/HYBM
8PLH/830/HYBM
8PLH/835/HYBM
8PLH/840/HYBM
5.5PLV/835/HYBM
5.5PLV/840/HYBM
8.5PLV/827/HYBM
8.5PLV/830/HYBM
8.5PLV/835/HYBM
8.5PLV/840/HYBM
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
120-277V
5.5PLV 8.5PLV
5.5PLH 8PLH
031622
* Ballast Dependent. Please refer to www.greencreative.com for full ballast compatibility list. **Please visit www.greencreative.com for Limited Warranty terms. www.greencreative.com - [email protected] - Tel / Fax: (866) 774-5433 - / GREENCREATIVELED / GClightingLED / GREEN-CREATIVE An ILLUMUS Brand
15.5PLH 16.5PLV
ATTACHMENT 2
DIMENSION & WEIGHT MOL
Dia.
Dia.
MOL
Where xxx means 824-965 which indicates CRI and color temperature Compatible base
5-3/8"
1-3/8"
0.15lb
G24d, GX24d, G24q & GX24q (2/4-pin CFL)
Model
5.5PLH/xxx/HYBM
5.5PLH/xxx/HYBM/R 8PLH/xxx/HYBM
6-3/8"
1-3/8"
0.18lb
MOL
Dia
Weight
Compatible base
Model
MOL
Dia
Weight
Where xxx means 824-965 which indicates CRI and color temperature 5-3/8"
2-9/16"
0.16lb
G24d, GX24d, G24q & GX24q (2/4-pin CFL)
G24d/GX24d (2-pin)
5.5PLV/xxx/HYBM 8.5PLV/xxx/HYBM
5-3/8"
3-9/16"
0.20lb
www.greencreative.com - [email protected] - Tel / Fax: (866) 774-5433 - / GREENCREATIVELED / GClightingLED / GREEN-CREATIVE An ILLUMUS Brand MOL Dia.
MOL
Where xxx means 824-965 which indicates CRI and color temperature Compatible base
5-5/8”
1-3/4"
0.55 lb
6-7/16"
3-7/16"
0.66 lb
G24d, GX24d, G24q & GX24q (2/4-pin CFL)
Model 15.5PLH/xxx/BYP/R 16.5PLV/xxx/BYP
MOL
Dia
Weight
Dia.
BYPASS AND HYBRID BYPASS PL
ATTACHMENT 2
www.greencreative.com - [email protected] - Tel / Fax: (866) 774-5433 - / GREENCREATIVELED / GClightingLED / GREEN-CREATIVE An ILLUMUS Brand Product Series
Master Carton
Non-enclosed Fixture Horizontal Installation Model Number Lamp Compartment
Dimensions
Diameter
Height
Maximum Lamps in Luminaire
Lampholder-to-Lampholder Spacing
5.5PLH/xxx/HYBM
5.5PLH/xxx/HYBM/R 8PLH/xxx/HYBM
Non-enclosed Fixture Vertical Installation Model Number Lamp Compartment
Dimensions
Diameter
Height
Maximum Lamps in Luminaire
5.5PLV/xxx/HYBM 8.5PLV/xxx/HYBM
Case Qty Case Dimensions (LxWxH) Case Weight Case Qty Case Dimensions (LxWxH) Case Weight Shipping Carton
15.5PLH/xxx/BYP/R
16.5PLV/xxx/BYP
5.5PLH/xxx/HYBM
5.5PLH/xxx/HYBM/R
8PLH/xxx/HYBM
5.5PLV/xxx/HYBM
8.5PLV/827/HYBM
6PCS
6PCS
6PCS
6PCS
6PCS
7-3/16" x 5-15/16" x 4-3/16"
11" x 7-7-1/2" x 7"
6-11/16" x 4-1/2" x 3.3/16"
8-5/16" x 5-5/8" x 5-1/2"
11-5/16" x 7-1/2" x 5-1/2"
3.64 lb
5.29 lb
1.1 lb
1.6 lb
2.4 lb
24PCS
24PCS
24PCS
24PCS
24PCS
15-3/16" x 5-7/16” x 12-13/16"
30-13/16" x 11-15/16" x 8-5/16"
14-5/16"×10-1/8"×4-1/2"
23"×9"×6-11/16"
30-15/16"×12"×6-13/16"
15.32 lb
22.7 lb
5.0 lb
7.0 lb
10.1 lb
ORDERING INFORMATION
ORDERING INFORMATION MINIMUM COMPARTMENT DIMENSIONS - PL HYBM 6-1/8"
4-3/4"
2 3/8"
6-1/8"
4-3/4"
2 3/8"
4-1/2"
7-3/4"
6-1/2"
8-3/4"
Height
Aperture Diameter
Aperture Diameter
Height
1 1
BYPASS AND HYBRID BYPASS PL
6PCS 5-11/16" x 4-1/2" x 3-3/16" 1.0 lb 24PCS 12"×9-15/16"×4-5/16" 4.7 lb HYBrid Installation - DIRect (Magnetic Ballasts) or BYPass OR
When used with a magnetic ballast, the lamp can function as a plug & play lamp and operate with the existing ballast.
If the ballast is not compatible, it can be bypassed and the lamp can run directly off line voltage.
G24d, GX24d (2-pin) G24q/GX24q (4-pin)
ATTACHMENT 2
HYBRID BYPASS PL
Note: All rights reserved. All sizes and specifications are subject to change at any time without notice. *** Warranty based on a maximum of 4,368 annual operating hours (per year for ten years) and exposure to a maximum fixture operating temperature of 80°F / 27°C **** xx – Refers to the CCT yy – Refers to model generations within the same nominal performance. Typically blank, ‘R’, or ‘RC’ Model Description****
15.5PLH/BYP/10YEARWARRANTY
16.5PLV/BYP/10YEARWARRANTY
5.5PLH/HYBM/10YEARWARRANTY
8PLH/HYBM/10YEARWARRANTY
5.5PLV/HYBM/10YEARWARRANTY
8.5PLV/HYBM/10YEARWARRANTY
10 Year warranty for 15.5PLH/8xx/BYP/yy
10 Year warranty for 16.5PLV/8xx/BYP/yy
10 Year warranty for 5.5PLH/8xx/HYBM/yy
10 Year warranty for 8PLH/8xx/HYBM/yy
10 Year warranty for 5.5PLV/8xx/HYBM/yy
10 Year warranty for 8.5PLV/8xx/HYBM/yy
www.greencreative.com - [email protected] - Tel / Fax: (866) 774-5433 - / GREENCREATIVELED / GClightingLED / GREEN-CREATIVE An ILLUMUS Brand G24d, GX24d (2-pin) G24q/GX24q (4-pin)
EXTENDED WARRANTIES***
ACCESSORY ORDERING INFORMATION
Product Model Description Pictures Dimensions Compatible Skus BYPass Installation
98003 23EMDRIVER
15.5PLH/xxx/BYP/R
16.5PLV/xxx/BYP
8PLH/xxx/HYBM
8.5PLV/xxx/HYBM
5.5PLH/xxx/HYBM
5.5PLH/xxx/HYBM/R
8PLH/xxx/HYBM
5.5PLV/xxx/HYBM
8.5PLV/xxx/HYBM
5.5PLH/xxx/HYBM
5.5PLH/xxx/HYBM/R
8PLH/xxx/HYBM
5.5PLV/xxx/HYBM
8.5PLV/xxx/HYBM
California Title 20 Compliant
23W Emergency LED Driver
(Field Installation)
2-1/4”
10-7/16”
24-3/8” 24-3/8”
2-3/16” 10-7/16” 2-3/4”
17-3/4”
2-3/4”
17-3/4”
35W Emergency Inverter
(Field Installation)
California Title 20 Compliant
35W Emergency Inverter
(Field Installation)
58012
58013
35EMINVERTER
35EMINVERTER/CEC
ATTACHMENT 2
R:\MANTECA\BAR SCREEN\CONSTRUCTION\PCOS\MT-BAR-PCO-04.DOC 1 of 1
PROPOSED CHANGE ORDER
PROJECT TITLE: City of Manteca WQCF
WQCF Bar Screen Project
GSE Construction Company Inc.
DATE: 07/13/22
JOB NUMBER: 2020-142 T02
PCO NUMBER: PCO-04
SUBJECT: $9,09
REVIEWED BY: GPH
______________________________________________________________________________ Work Description:
The grating under PCO-02 requires additional supports for proper installation. GSE has agreed to provide additional FRP supports for a cost of $9,092. Beams to be shown on Shop Drawing
23. This work is approved.
ATTACHMENT 2
GSE CONSTRUCTION INC. DATE: 7/25/2022
Manteca WQCF Bar Screen Phase 1 Project GSE PCO #005
PROJECT No. : 816 CLIENTS PCO # 2
CHANGE ORDER CALCULATION
BRIEF DESCRIPTION OF CHANGE
Labor + Surcharge D I R E C T C O S T S TOTAL
DIRECT
DESCRIPTION QUANTITY UNIT EQUIP. MATERIAL LABOR SUB HOURS RATE EQUIP. MATERIAL LABOR SUB TOTAL COST PVC Liner Repair (Mason Painting)
Additional FRP Support (6 I-Beam) 1 LS $0 $0.00 0 $ 6,939.00 0.0 0.00 $0.00 $0.00 $0 $6,939 $6,939 Project Engineer 2 Hrs $0 $0.00 1 $ - 2.0 80.38 $0.00 $0.00 $161 $0 $161 Sales tax 8.250 % $0.00 $0
TOTALS 2.0 $80.38 $0 $0.00 $161 $6,939 $7,100
MARKUP EQUIPMENT 15 % $0 $0
MARKUP MATERIALS 15 % $0 $0
MARKUP ON LABOR 15 % $24 $24
MARKUP SUBCONTRACTS 5 % $347 $347
INSURANCE (all risk) 1 % $75
TOTAL CHANGE COST $7,546
UNIT PRICES
Repair of PVC Liner in Influent Channel The PVC liner is coming off the wall in a portion of the influent channel ATTACHMENT 2
MASON PAINTING
P.0. Box 1115 Orangevale CA, 95662
CA Lic. # 819987 DIR 1000008947
(916)852‐8060 fax (916)852‐8034
SSPC QP‐1 CERTIFIED
PROPOSAL
DATE: July 8, 2022
CONTRACTOR: G.S.E. Construction
PROJECT: WQCF Bar Screen
DESCRIPTION OF WORK: Provide skilled labor, materials, and equipment to removed damaged area of PVC liner as shown in attached photograph, and repair with ShieldLok rehabilitation system.
Removed degraded concrete, apply primer, mastic, pvc sheet, and weld in place per manufacturers recommendations
BASE BID: $ 6,939.00
EXCLUSIONS:
1. Concrete or repair mortar installation if deemed necessary. If after degraded concrete has been removed and it is deemed that the void is too deep to apply the sheeting and mastic over directly, and costs to repair spalling will be deemed extra.
2. Stop or repair to active water leaks thru concrete. If a waterleak behind damaged liner is found, resulting sealing of leak will be deemed extra.
Gus Kelley
‐ Estimator Mason Painting
[email protected]
ATTACHMENT 2
R:\MANTECA\BAR SCREEN\CONSTRUCTION\PCOS\MT-BAR-PCO-05.DOC 1 of 2
PROPOSED CHANGE ORDER
PROJECT TITLE: City of Manteca WQCF
WQCF Bar Screen Project
GSE Construction Company Inc.
DATE: 07/14/22
JOB NUMBER: 2020-142 T02
PCO NUMBER: PCO-05
SUBJECT: Repair of PVC Liner in Influent Channel
REVIEWED BY: GPH
______________________________________________________________________________ Work Description:
The PVC liner is coming off the wall in a portion of the influent channel. See attached photo.
Contractor has obtained a quote from the coating specialist for repair of the coating at $6,939 per attached proposal. This has been accepted by the City. Please add GSE markup and proceed on the work.
ATTACHMENT 2
R:\MANTECA\BAR SCREEN\CONSTRUCTION\PCOS\MT-BAR-PCO-05.DOC 2 of 2 ATTACHMENT 2