CITY OF MANTECA
User Fee Study Report
April 2019
Engineering &
Development Fee Study
ATTACHMENT 1
i Comprehensive User Fee Study

TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................. i Executive Summary .................................................................................................. 1 User Fee Background ............................................................................................... 2 Background .................................................................................................................................................. 2 California User Fee History .......................................................................................................................... 2 Additional Policy Considerations ................................................................................................................. 3 Study Objective ....................................................................................................... 4 Scope of the Study ....................................................................................................................................... 4 Aim of the Report......................................................................................................................................... 5 Project Approach and Methodology ........................................................................... 6 Conceptual Approach................................................................................................................................... 6 Fully Burdened Hourly Rates........................................................................................................................ 6 Summary Steps of the Study ........................................................................................................................ 7 Allowable Costs ............................................................................................................................................ 7 Methodology ................................................................................................................................................ 8 Quality Control/Quality Assurance .............................................................................................................. 8 Reasons for cost increases/decreases over current fees............................................................................. 9 City Staff Contributions ................................................................................................................................ 9 Manteca User Fees ................................................................................................ 10 Cost Recovery............................................................................................................................................. 10 Subsidization .............................................................................................................................................. 10 Impact on Demand (Elasticity) ................................................................................................................... 11 Summary .................................................................................................................................................... 11 Engineering .......................................................................................................... 12 Analysis ...................................................................................................................................................... 12 Building ................................................................................................................ 13 Analysis ...................................................................................................................................................... 13 Planning ............................................................................................................... 14 Analysis ...................................................................................................................................................... 14 Appendix A – Total Allowable Cost to be Recovered .................................................. 15 ATTACHMENT 1
ii Comprehensive User Fee Study
Appendix B – Fully Burdened Hourly Rates ............................................................... 16 Appendix C – Cost Recovery Analysis ....................................................................... 23 ATTACHMENT 1
1 Comprehensive User Fee Study
Executive Summary
The City of Manteca engaged Willdan Financial Services (Willdan) to determine the full costs incurred by the City to support the various activities for which the City charges user fees. Due to the complexity and the breadth of performing a comprehensive review of fees, Willdan employed a variety of fee methodologies to identify the full costs of individual fee and program activities. This report and the appendices herein identifies 100% full cost recovery for City services and the recommended level of recovery as determined through discussion with departmental staff.

The reality of the local government fee environment is that significant increases to achieve 100% cost recovery can often not be feasible, desirable, or appropriate depending on policy direction —particularly in a single year. The recommended fees identified herein are either at or less than full cost recovery.

ATTACHMENT 1
2 Comprehensive User Fee Study
User Fee Background
Background
As part of a general cost recovery strategy, local governments adopt user fees to fund programs and services that provide limited or no direct benefit to the community as a whole. As cities struggle to maintain levels of service and variability of demand, they have become increasingly aware of subsidies provided by the General Fund and have implemented cost-recovery targets. To the extent that governments use general tax monies to provide individuals with private benefits, and not require them to pay the full cost of the service (and, therefore, receive a subsidy), the government is limiting funds that may be available to provide other community-wide benefits. In effect, the government is using community funds to pay for private benefit. Unlike most revenue sources, cities have more control over the level of user fees they charge to recover costs, or the subsidies they can institute.

Fees in California are required to conform to the statutory requirements of the California Constitution, Proposition 218, and the California Code of Regulations. The Code also requires that the City Council adopt fees by either ordinance or resolution, and that any fees in excess of the estimated total cost of rendering the related services must be approved by a popular vote of two-thirds of those electors voting because the charge would be considered a tax and not a fee.

California User Fee History
Before Proposition 13, California cities were less concerned with potential subsidies and recovering the cost of their services from individual fee payers. In times of fiscal shortages, cities simply raised property taxes, which funded everything from police and recreation to development-related services. However, this situation changed with the passage of Proposition 13 in 1978.

Proposition 13 established the era of revenue limitation in California local government. In subsequent years, the state saw a series of additional limitations to local government revenues. Proposition 4 (1979) defined the difference between a tax and a fee: a fee can be no greater than the cost of providing the service; and Proposition 218 (1996) further limited the imposition of taxes for certain classes of fees. As a result, cities were required to secure a supermajority vote in order to enact or increase taxes. Since the public continues to resist efforts to raise local government taxes, cities have little control and very few successful options for new revenues. Compounding this limitation, the State of California took a series of actions in the 1990’s and 2000’s to improve the State’s fiscal situation—at the expense of local governments. As an example, in 2004-05, the Educational Revenue Augmentation Funds (“ERAF”) take-away of property taxes and the reduction of Vehicle License Fees have severely reduced local tax revenues.

In addition, on November 2, 2010, California voters approved Proposition 26, the “Stop Hidden Taxes Initiative”, which is aimed at defining “regulatory fees” as a special tax rather than a fee, thus requiring approval by two-thirds vote of local voters. These regulatory fees are typically intended to mitigate the societal and environmental impacts of a business or person’s activities. Proposition 26 contains seven categories of exceptions. The fees analyzed as part of this study fell under categories one through five consisting of charges for specific benefits, government service, regulatory need, for use of government property, or a fine/penalty.

ATTACHMENT 1
3 Comprehensive User Fee Study
Additional Policy Considerations
The recent trend for municipalities is to update their fee schedules to reflect the actual costs of certain public services primarily benefitting users. User Fees recover costs associated with the provision of specific services benefiting the user, thereby reducing the use of General Fund monies for such purposes.

In addition to collecting the direct cost of labor and materials associated with processing and administering user services, it is common for local governments to recover support costs. Support costs are those costs relating to a local government’s internal service departments that are properly allocable to the local government’s operating departments. Internal Service Funds support cost allocations were incorporated using the resulting indirect overhead percentages determined through the Cost Allocation Plan. This plan was developed prior to the User Fee study to determine the burden placed upon Internal Service Funds by the operating departments in order to allocate a proportionate share of internal service cost.

As labor effort and costs associated with the provision of services fluctuate over time, a significant element in the development of any fee schedule is that it has the flexibility to remain current. Therefore, it is recommended that the City include an inflationary factor in the resolution adopting the fee schedule to allow the City Council, by resolution, to annually increase or decrease the fees.

The City may employ many different inflationary factors. The most commonly used inflator is some form of the Consumer Price Index (CPI) as it is widely well known and accepted. A similar inflator is the implicit price deflator for GDP, which is much like the CPI except that while the CPI is based on the same “basket” of goods and services every year, the price deflators’ “basket” can change year to year. Since the primary factor for the cost of a City’s services is usually the costs of the personnel involved, tying an inflationary factor that connects more directly to the personnel costs can be suitable if there is a clear method, or current practice of obtaining said factor.

Each City should use an inflator that they believe works the best for their specific situation and needs. It is also recommended that the City perform this internal review annually with a comprehensive review of services and fees performed every three to five years, which would include adding or removing fees for any new or eliminated programs/services.

ATTACHMENT 1
4 Comprehensive User Fee Study
Study Objective
As the City of Manteca seeks to efficiently manage limited resources and adequately respond to increased service demands, it needs a variety of tools. These tools provide assurance that the City has the best information and the best resources available to make sound decisions, fairly and legitimately set fees, maintain compliance with state law and local policies, and meet the needs of the City administration and its constituency. Given the limitations on raising revenue in local government, the City recognizes that a User Fee Study is a very cost-effective way to understand the total cost of services and identify potential fee deficiencies. Essentially, a User Fee is a payment for a requested service provided by a local government that primarily benefits an individual or group.

The total cost of each service included in this analysis is based on the full cost of providing City services, including direct salaries and benefits of City staff, direct departmental costs, and indirect costs support.

This study determines the full cost recovery fee for the City to provide each service; however, each fee is set at the City’s discretion, up to 100% of the total cost, as specified in this report.

The principal goal of the study was to help the City determine the full cost of the services that the City provides. In addition, Willdan established a series of additional objectives including:
 Developing a rational basis for setting fees
 Identifying subsidy amount, if applicable, of each fee in the model  Ensuring compliance with State law
 Developing an updatable and comprehensive list of fees  Maintaining accordance with City policies and goals
The study results will help the City better understand its true costs of providing services and may serve as a basis for making informed policy decisions regarding the most appropriate fees, if any, to collect from individuals and organizations that require individualized services from the City.

Scope of the Study
The scope of this study encompasses a review and calculation of the user fees charged by the following Manteca departments and fee groups:
 Building
 Engineering
 Planning
The study involved the identification of existing and potential new fees, fee schedule restructuring, data collection and analysis, orientation and consultation, quality control, communication and presentations, and calculation of individual service costs (fees) or program cost recovery levels.

ATTACHMENT 1
5 Comprehensive User Fee Study
Aim of the Report
The User Fee Study focused on the cost of City services, as City staff currently provides them at existing, known, or reasonably anticipated service and staff levels. This report provides a summary of the study results, and a general description of the approach and methods Willdan and City staff used to determine the recommended fee schedule. The report is not intended to document all of the numerous discussions throughout the process, nor is it intended to provide influential dissertation on the qualities of the utilized tools, techniques, or other approaches.

ATTACHMENT 1
6 Comprehensive User Fee Study
Project Approach and Methodology
Conceptual Approach
The basic concept of a User Fee Study is to determine the “reasonable cost” of each service provided by the City for which it charges a user fee. The full cost of providing a service may not necessarily become the City’s fee, but it serves as the objective basis as to the maximum amount that may be collected.

The standard fee limitation established in California law for property-related (non-discretionary) fees is the “estimated, reasonable cost” principle. In order to maintain compliance with the letter and spirit of this standard, every component of the fee study process included a related review. The use of budget figures, time estimates, and improvement valuation clearly indicates reliance upon estimates for some data.

Fully Burdened Hourly Rates
The total cost of each service included in this analysis is primarily based on the Fully Burdened Hourly Rates (FBHRs) that were determined for City personnel directly involved in providing services. The FBHRs include not only personnel salary and benefits, but also any costs that are reasonably ascribable to personnel. The cost elements that are included in the calculation of fully burdened rates are:
 Salaries & benefits of personnel involved
 Operating costs applicable to fee operations
 Departmental support, supervision, and administration overhead  Indirect City-wide overhead costs calculated through the Cost Allocation Plan An important factor in determining the fully burdened rate is in the calculation of productive hours for personnel. This calculation takes the available workable hours in a year of 2,080 and adjusts this figure to account for calculated or hours employees are involved in non-billable activities such as paid vacation, sick leave, emergency leave, holidays, and other considerations as necessary. Dividing the full cost by the number of productive hours provides the FBHR.

The FBHRs are then used in conjunction with time estimates, when appropriate, to calculate a fee’s cost based on the personnel and the amount of their time that is involved in providing each service.

ATTACHMENT 1
7 Comprehensive User Fee Study
Summary Steps of the Study
The methodology to evaluate most User Fee levels is straightforward and simple in concept. The following list provides a summary of the study process steps:

Allowable Costs
This report identifies three types of costs that, when combined, constitute the fully burdened cost of a service (Appendix A). Costs are defined as
direct labor, including salary and benefits,
departmental overhead costs, and the City’s
Internal Service Funds overhead, where
departmental and internal service overhead
costs constitute support costs. These cost
types are defined as follows:
 Direct Labor (Personnel Costs): The
costs related to staff salaries for
time spent directly on fee-related
services.
 Departmental Overhead: A
proportional allocation of
departmental overhead costs,
including operation costs such as
supplies and materials that are necessary for the department to function.  Internal Service Funds Overhead: These costs, detailed in the City’s Cost Allocation Plan, represent services provided by those Internal Service Funds Departments whose primary function is to support other City departments.

Data Analysis
Department Interviews
Time Estimates
Labor Costs
Cost Allocation Plan
Building Cost Layers
Direct Services
Indirect Services
Department Overhead
City-Wide Overhead
Set Fees
Define the Full Cost of
Services
Set Cost Recovery Policy
ATTACHMENT 1
8 Comprehensive User Fee Study
Methodology
The three methods of analysis for calculating fees used in this report are the:

Case Study Method (Standard Unit Cost Build-Up Approach): This approach estimates the actual labor and material costs associated with providing a unit of service to a single user. This analysis is suitable when City staff time requirements do not vary dramatically for a service, or for special projects where the time and cost requirements are easy to identify at the project’s outset. Further, the method is effective in instances when a staff member from one department assists on an application, service or permit for another department on an as-needed basis. Costs are estimated based upon interviews with City staff regarding the time typically spent on tasks, a review of available records, and a time and materials analysis.

Programmatic Approach: In some instances, the underlying data is not available or varies widely, leaving a standard unit cost build-up approach impractical. In addition, market factors and policy concerns (as opposed to actual costs) tend to influence fee levels more than other types of services. Willdan employed a different methodology where appropriate to fit the programs’ needs and goals. Typical programmatic approach cases are facility use fees, penalties, and instances where a program cost is divided over the user base to obtain a per applicant cost for shared cost services.

Valuation Based Fees: This manner of collection is used when the valuation of the improvement can be used as a proxy for the amount of effort it would take for City staff to complete the service provided. More specifically, this approach is commonly used for certain User Fees in the Building Division. It is generally accepted that as a project’s size scales up, the cost of the project increases, and the amount of effort needed to review and inspect also increases. Using a valuation-based fee provides for a system that can adjust as project sizes scale. Land is not included in the valuation.

Quality Control/Quality Assurance
All study components are interrelated, thus flawed data at any step in the process will cause the ultimate results to be inconsistent and unsound. The elements of our Quality Control process for User Fee calculations include:
 Involvement of knowledgeable City staff
 Clear instructions and guidance to City staff
 Reasonableness tests and validation
 Normalcy/expectation ranges
 Internal and external reviews
 Cross-checking
ATTACHMENT 1
9 Comprehensive User Fee Study
Reasons for cost increases/decreases over current fees
Within the fee tables in Appendix C, the differences are identified between the full costs calculated through the study and the fee levels currently in effect. The reasons for differences between the two can arise from a number of possible factors including:
 Previous fee levels may have been set at levels less than full cost intentionally, based on policy decisions
 Staffing levels and the positions that complete fee and service activity may vary from when the previous costs were calculated
 Personnel and materials costs could have increased at levels that differed from any inflationary factors used to increase fees since the last study
 Costs that this study has identified as part of the full cost of services may not have been accounted for in a previous study
o Departmental overhead and administration costs
o Internal service fund support costs
o Indirect overhead from the Cost Allocation Plan
 Changes in processes and procedures within a department, or the City as a whole, as well as changes in the Building Code and other compliance requirements City Staff Contributions
As part of the study process, Willdan received tremendous support and cooperation from City staff, which contributed and reviewed a variety of components to the study, including:
 Budget and other cost data
 Staffing structures
 Fee and service structures, organization, and descriptions  Direct and indirect work hours (billable/non-billable)  Time estimates to complete work tasks
 Review of draft results and other documentation
A User Fee Study requires significant involvement of the managers and line staff from the departments— on top of their existing workloads and competing priorities. The contributions from City staff were critical to this study. We would like to express our appreciation to the City and its staff for their assistance, professionalism, positive attitudes, helpful suggestions, responsiveness, and overall cooperation.

ATTACHMENT 1
10 Comprehensive User Fee Study
Manteca User Fees
Cost Recovery
The cost recovery models, by department/division fee type, are presented in detail in Appendix C. Full cost recovery is determined by summing the estimated amount of time each position (in increments of minutes or hours) spends to render a service. Time estimates for each service rendered were predominately determined by Willdan and City Staff through a time and materials survey conducted for each department/division fee included in the study. The resulting cost recovery amount represents the total cost of providing each service. The City’s current fee being charged for each service, if applicable, is provided in this section, as well, for reference.

It is important to note that the time and materials survey used to determine the amount of time each employee spends assisting in the provision of the services listed on the fee schedule is essential in identifying the total cost of providing each service. Specifically, in providing services, a number of employees are often involved in various aspects of the process, spending anywhere from a few minutes to several hours on the service.

A primary goal of this study was to identify the cost of City services, to provide information to help the City make informed decisions regarding the actual fee levels and charges. The responsibility to determine the final fee levels is a complicated task. City staff must consider many issues in formulating recommendations, and the City Council must consider those same issues and more in making the final decisions.

City staff assumes the responsibility to develop specific fee level recommendations to present to the City Council. Unfortunately, there are no hard and fast rules to guide the City, since many of the considerations are based on the unique characteristics of the City of Manteca, and administrative and political discretion.

However, in setting the level of full cost recovery for each fee, one should consider whether the service solely benefits one end user or the general community.

Subsidization
Recalling the definition of a user fee helps guide decisions regarding subsidization. The general standard is that individuals (or groups) who receive a wholly private benefit should pay 100% of the full cost of the services. In contrast, services that are simply public benefit should be funded entirely by the general fund’s tax dollars. Unfortunately, for the decision makers, many services fall into the range between these two extremes.

Further complicating the decision, opponents of fees often assert that the activities subject to the fees provide economic, cultural, “quality of life,” or other community benefits that exceed the costs to the City.

It is recommended the City consider such factors during its deliberations regarding appropriate fee levels.

Of course, subsidization can be an effective public policy tool, since it can be used to reduce fees to encourage certain activities (such as compliance inspections to ensure public safety) or allow some people to be able to afford to receive services they otherwise could not at the full cost. In addition, subsidies can ATTACHMENT 1
11 Comprehensive User Fee Study
be an appropriate and justifiable action, such as to allow residents to rightfully access services, without burdensome costs.

Despite the intent, it is important for the City and public to understand that subsidies must be covered by another revenue source, such as the General Fund. Therefore, the general taxpayer will potentially help to fund private benefits, and/or other City services will not receive funds that are otherwise directed to cover subsidies.

Impact on Demand (Elasticity)
Economic principles of elasticity suggest that increased costs for services (higher fees) will eventually curtail the demand for the services; whereas lower fees may spark an incentive to utilize the services and encourage certain actions. Either of these conditions may be a desirable effect to the City. However, the level of the fees that would cause demand changes is largely unknown. The Cost of Service Study did not attempt to evaluate the economic or behavioral impacts of higher or lower fees; nevertheless, the City should consider the potential impacts of these issues when deciding on fee levels.

Summary
If the City’s principal goal of this study were to maximize revenues from user fees, Willdan would recommend setting user fees at 100% of the full cost identified in this study. However, we understand that revenue enhancement is not the only goal of a cost of service study, and sometimes full-cost recovery is not needed, desired, or appropriate. Other City and departmental goals, City Council priorities, policy initiatives, past experience, implementation issues, and other internal and external factors may influence staff recommendations and City Council decisions. In this case, the proper identification of additional services (new or existing services) and creation of a consistent and comprehensive fee schedule was the primary objective of this study. City staff has reviewed the full costs and identified the “recommended fee levels” for consideration by City Council. The attached appendices exhibit these unit fees individually.

The preceding sections provide background for each department or division and the results of this study’s analysis of their fees. For the full list of each fee’s analysis, refer to Appendix C of this report.

ATTACHMENT 1
12 Comprehensive User Fee Study
Engineering
The primary function of the Engineering Division is to promote the orderly development of the City of Manteca by providing general engineering services to regulate the construction of municipal structures, city streets, sewage disposal, water supply and storm drainage facilities. Through regulation, the goal is to provide a high standard of construction quality and to preserve and protect public health, safety, and convenience.

Analysis
Willdan individually reviewed the services and programs associated with Engineering. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Engineering Services relied primarily upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Internal Service Funds.

Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that current fee levels are subsidizing the cost for most services. The analysis found that services are being provided below cost recovery with an average subsidy of 47%. It is recommended that the City increase Engineering Services fees full cost recovery as detailed in Appendix C. As a result, there would be:
 an increase to 41 fees;
 17 new fees would be added;
 6 fees would remain as currently set, and;
 the average increase for existing fees would be around 53%.

ATTACHMENT 1
13 Comprehensive User Fee Study
Building
The goal of the Building Safety Division is to provide a positive customer service experience to our contractors, developers, design professionals, and property owners and maintain minimum standards to safeguard life or limb, health, property, and public welfare by regulating and controlling the design, construction, quality of materials, use and occupancy, location, and maintenance of all buildings and structures.

Analysis
Willdan individually reviewed the services and programs associated with Development Services. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Development Services relied primarily upon a standard unit cost build-up approach (except for fees related to the Building Permit program), whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro-rata share of departmental costs, including indirect costs for City Internal Service Funds. The analysis found that most services are currently set below the full cost of providing them. It is recommended that the City increase cost recovery to 100% for Building services as detailed in Appendix C. As a result, there would be:
 an increase to 78 fees;
 16 fees would decrease;
 15 fees would remain as currently set;
 2 new fees would be added, and;
 the average estimated fee increase would be around 2%.

In addition to the above referenced fees listed under Building, the Building Permit fee program is also provided by this division. For the Building Permit fees, valuation is used as a proxy for measuring the amount of effort needed to provide services on a case by case basis. This method is an industry standard widely used by other jurisdictions to evaluate the cost of providing service. It is generally understood that the larger and more complex a project is, more time and effort that is required to provide the service.

Project valuation also follows that trend, and so by using a combination of either project valuation or historical revenue figures along with a multiplier or cost recovery analysis for historical and anticipated future construction trends, current cost recovery along with variability in charges due to project type and scale is determined. The result of the cost analysis completed using fee activity going back to fiscal year 2018 and future projections for Building Permits and found that the program is currently operating at 59% cost recovery. It is suggested that the fees be increased to raise cost recovery to 100%, which would require a 70% increase. Current and new fees are detailed in Appendix C.

ATTACHMENT 1
14 Comprehensive User Fee Study
Planning
The Planning Division of the Development Services Department is responsible for planning for the future development of Manteca. Examples of the division's work include: reviewing and approving land-use and development proposals, implementing the City's General Plan, administering the Zoning Ordinance, processing updates and amendments to the General Plan and Zoning Ordinance, creating master plans, ensuring compliance with State and Federal mandates regarding development, land divisions, and environmental review, and acting as staff for the City's Planning Commission.

The day-to-day functions of the Planning Division include: providing information to the public concerning zoning and land-use regulations, development standards, flood-plain designations, and demographics, processing applications for Temporary Use Permits, Home Occupation Permits, and Large Family Day Care Permits, as well as authorizing zoning clearances for business licenses.

Analysis
Willdan individually reviewed the services and programs associated with the Planning Division. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Planning Services relied primarily upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Internal Service Funds.

Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most flat rate fees are currently set below the full cost of providing the service. It is recommended that the City increase the Planning Division fees to 100% cost recovery as detailed in Appendix C. As a result, there would be:
 an increase to 63 fees;
 2 new fees would be added;
 3 fees would decrease;
 2 fees would remain as currently set, and;
 the average estimated fee increase would be around 10%.

ATTACHMENT 1
15 Comprehensive User Fee Study
Appendix A – Total Allowable Cost to be Recovered
Below are the total allowable costs that may be recovered through User Fees; however, only a percentage of the total cost is realized as staff doesn’t just work on services related to User Fees, but also work on an array of other City functions during the operational hours of the City. The amounts listed below will not reconcile to City budgets as costs that should not be included in overhead for personnel in the application of determining fully burdened hourly rates were excluded. Examples of these costs are capital, debt, monetary transfers, passthrough contract costs, and any other costs that is charged directly to the service requestor.

City of Manteca - User Fee
Overhead Rate Calculations
Department
Total Salaries &
Benefits
Department
Operations &
Administration
Direct
Overhead
%
Indirect
Allocation
%
100: Administrative Services 495,108 54,825 11% 0%
100: Building Maintenance 607,563 148,670 24% 0%
100: City Clerk 657,840 75,035 11% 0%
100: City Manager 764,240 54,200 7% 0%
100: Economic Development 236,430 48,620 21% 6%
100: Finance 1,191,537 93,409 8% 0%
100: Fire Protection 254,992 222,601 87% 12%
100: Parks & Recreation 4,175,511 1,488,575 36% 20%
100: Police Protection 17,564,560 1,539,795 9% 17%
100: Public Works 320,561 284,236 89% 16%
340: Development Services 3,129,246 3,023,509 97% 14%
620: Golf Course 824,430 410,190 50% 15%
640: Sewer M & O 6,469,141 3,901,129 60% 9%
660: Solid Waste 5,340,051 3,433,395 64% 13%
680: Water M & O 5,237,708 4,650,906 89% 11%
810: Engineering 281,411 209,637 74% 0%
830: Information Technology 1,248,170 770,593 62% 0%
ATTACHMENT 1
16 Comprehensive User Fee Study
Appendix B – Fully Burdened Hourly Rates
Below are fully burdened hourly rates of staff positions that provide for the services detailed in Appendix C. The FBHRs were used to determine the full cost of each service. They include the salary and benefit costs for each position as well as all applicable overhead amounts for each position. For any user fee service request that is outside the scope of the fees detailed in Appendix C, or for services for which there is no fee currently set, the City can charge up to the full cost of the FBHR for personnel involved.

ATTACHMENT 1
17 Comprehensive User Fee Study
City of Manteca - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
100: Administrative Services Admin - Administrative Assistant I $53.97 100: Administrative Services Admin - Director of Human Resources $184.02 100: Administrative Services Admin - Human Resources Analyst $89.10 100: Administrative Services Admin - Human Resources Manager $143.41 100: Administrative Services Admin - Risk Analyst $89.10 100: City Clerk Clerk - Administrative Assistant III $70.05 100: City Clerk Clerk - Assistant Director of Legislative Services $142.43 100: City Clerk Clerk - Deputy City Clerk/Records Manager $102.23 100: City Clerk Clerk - Director of Legislative Services $184.57 100: City Manager CM - Assistant City Manager $226.74
100: City Manager CM - City Manager $226.30
100: City Manager CM - Deputy City Manager $176.51
100: City Manager CM - Executive Assistant to City Manager $116.62 100: Economic Development Econ - Economic Development Manager $177.67 100: Economic Development Econ - Economic Development Specialist $82.44 100: Economic Development Econ - Economic Development Specialist II $86.53 100: Economic Development Econ - Economic Development Specialist III $90.93 100: Finance Fin - Accountant $103.91
100: Finance Fin - Accounting Manager $137.87
100: Finance Fin - Accounting Technician $63.05
100: Finance Fin - Administrative Assistant I $52.40
100: Finance Fin - Budget Manager $137.87
100: Finance Fin - Customer Service Representative $57.21 100: Finance Fin - Finance Director $178.66
100: Finance Fin - Financial Analyst $97.99
100: Finance Fin - Payroll Technican $80.50
100: Finance Fin - Purchasing Officer $107.92
100: Finance Fin - Records Manager $122.04
100: Finance Fin - Senior Accountant $98.95
100: Finance Fin - Senior Financial Analyst $107.92
100: Finance Fin - Utilities Coordinator $72.98
100: Fire Protection Fire - Administrative Assistant III $132.13 100: Fire Protection Fire - Administrative Chief/Fire Marshall (Sworn) $264.81 100: Fire Protection Fire - Fire Battalion Chief (Sworn) $286.05 100: Fire Protection Fire - FIRE CAPTAIN $243.04
100: Fire Protection Fire - Fire Chief - Sworn $416.81
100: Fire Protection Fire - Fire Inspector I $142.20
100: Fire Protection Fire - Fire Inspector II $156.85
100: Fire Protection Fire - FIREFIGHTER $184.76
100: Fire Protection Fire - FIREFIGHTER/ ENGINEER $206.11 ATTACHMENT 1
18 Comprehensive User Fee Study
City of Manteca - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
100: Building Maintenance Maint - Facilities Maintenance Manager $142.27 100: Parks & Recreation Parks - Director of Recreation & Community Services $265.94 100: Parks & Recreation Parks - Recreation Supervisor $145.31 100: Police Protection Police - Administrative Assistant III $80.14 100: Police Protection Police - Animal Services Officer $75.90 100: Police Protection Police - Booking Officer $94.57
100: Police Protection Police - Code Enforcement Supervisor(Non Sworn) $122.72 100: Police Protection Police - Code Enforcement Officer $94.57 100: Police Protection Police - Community Service Officer I $85.69 100: Police Protection Police - Community Service Officer II $94.57 100: Police Protection Police - Lead Animal Control Officer $83.33 100: Police Protection Police - Lead Police Records Clerk $90.02 100: Police Protection Police - Police Captain (Sworn) $217.42 100: Police Protection Police - Police Chief - Sworn $279.14 100: Police Protection Police - Police Lieutenant (Sworn) $197.11 100: Police Protection Police - Police Officer $143.43
100: Police Protection Police - Police Records Clerk I $74.05 100: Police Protection Police - Police Records Clerk II $81.68 100: Police Protection Police - Police Sergeant $174.36 100: Police Protection Police - Property & Evidence Officer $94.57 100: Police Protection Police - Public Safety Dispatch Coordinator $124.09 100: Police Protection Police - Public Safety Dispatcher I $94.57 100: Police Protection Police - Public Safety Dispatcher II $104.39 100: Public Works PW - Construction Inspector I $147.67 100: Public Works PW - Construction Inspector II $162.88 100: Public Works PW - Construction Manager $203.25
100: Public Works PW - Custodian I $107.65
100: Public Works PW - Custodian II $118.60
100: Public Works PW - Deputy Director of Maintenance & Operations $310.39 100: Public Works PW - Director of Public Works $398.23 100: Public Works PW - Equipment Mechanic I $127.51
100: Public Works PW - Equipment Mechanic II $140.60
100: Public Works PW - Facilities Maintenance Coordinator $167.03 100: Public Works PW - Facilities Maintenance Engineer $121.52 100: Public Works PW - Facilities Maintenance Engineer II $137.34 100: Public Works PW - Facilities Maintenance Engineer III $144.11 100: Public Works PW - Fleet Maintenance Manager $249.41 100: Public Works PW - Landscape Maintenance Supervisor $195.55 100: Public Works PW - Lead Custodian $127.51
100: Public Works PW - Lead Street Maintenance Worker $147.64 100: Public Works PW - Parks Operations Manager $246.93 ATTACHMENT 1
19 Comprehensive User Fee Study
City of Manteca - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
100: Public Works PW - Parks Planning/Project Superintendent $231.66 100: Public Works PW - Parks/Golf Maintenance Manager $249.41 100: Public Works PW - Parks/Golf Maintenance Supervisor $195.55 100: Public Works PW - Parks/Golf Maintenance Technician $137.34 100: Public Works PW - Parks/Golf Maintenance Worker I $113.11 100: Public Works PW - Parks/Golf Maintenance Worker II $124.54 100: Public Works PW - Parks/Golf Maintenance Worker III $137.34 100: Public Works PW - Parts Inventory Specialist $124.54 100: Public Works PW - Public Works Deputy Director-Utility Services $310.39 100: Public Works PW - Public Works Manager $249.41
100: Public Works PW - SCADA Engineer $249.41
100: Public Works PW - Senior Facilities Maintenance Engineer $159.05 100: Public Works PW - Senior Landscape Technician $179.44 100: Public Works PW - Street Maintenance Coordinator $159.05 100: Public Works PW - Street Maintenance/Equip Op I $113.11 100: Public Works PW - Street Maintenance/Equipment Op II $124.54 100: Public Works PW - Street Maintenance/Equipment Op III $137.34 100: Public Works PW - Streets Manager $249.41
100: Public Works PW - Traffic Sign & Markings Specialist $137.34 100: Public Works PW - Vehicle & Equipment Technician I $127.51 100: Public Works PW - Vehicle & Equipment Technician II $140.60 190: Federal Transit Management Fund 190 - Administrative Analyst $241.06 190: Federal Transit Management Fund 190 - Transit Supervisor $383.59 200: Recreation Fund 200 - Customer Service Representative $84.17 200: Recreation Fund 200 - Management Analyst $172.78
200: Recreation Fund 200 - Parks Operations Manager $179.55 200: Recreation Fund 200 - Parks/Golf Maintenance Manager $181.35 200: Recreation Fund 200 - Recreation Coordinator $97.41 340: Development Services Fund 340 - Administrative Assistant III $140.64 340: Development Services Fund 340 - Assistant Planner $193.21 340: Development Services Fund 340 - Associate Planner $221.04 340: Development Services Fund 340 - Building Inspector I $151.36 340: Development Services Fund 340 - Building Inspector II $166.95 340: Development Services Fund 340 - Deputy Director of Community Development $303.17 340: Development Services Fund 340 - Deputy Director of Development Services - Building $303.17 340: Development Services Fund 340 - Deputy Director of Development Services - Planning $303.17 340: Development Services Fund 340 - Development Services Tech $155.03 340: Development Services Fund 340 - Director of Development Services $404.15 340: Development Services Fund 340 - Planning Manager $281.98 340: Development Services Fund 340 - Real Property Manager $255.64 340: Development Services Fund 340 - Senior Building Inspector $183.93 340: Development Services Fund 340 - Senior Management Analyst $255.64 ATTACHMENT 1
20 Comprehensive User Fee Study
City of Manteca - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
340: Development Services Fund 340 - Senior Plan Check Engineer $255.64 340: Development Services Fund 340 - Senior Planner $243.55 340: Development Services Fund 340 - Senior Plans Examiner $202.89 620: Golf Course Fund 620 - Deputy Director of Maintenance & Operations $244.25 340: Development Services Fund 620 - Golf Course Maintenance Supervisor $200.44 620: Golf Course Fund 620 - Golf Equipment Mechanic $100.34 620: Golf Course Fund 620 - Management Analyst $186.99
620: Golf Course Fund 620 - Parks/Golf Maintenance Worker I $89.01 620: Golf Course Fund 620 - Parks/Golf Maintenance Worker II $98.01 620: Golf Course Fund 620 - Parks/Golf Maintenance Worker III $108.08 640: Sewer M & O Fund 640 - Administrative Assistant II $100.05 640: Sewer M & O Fund 640 - Chief of Wastewater Operations $210.65 640: Sewer M & O Fund 640 - Chief Plant Operator $193.74 640: Sewer M & O Fund 640 - Control Systems Specialist $171.71 640: Sewer M & O Fund 640 - Deputy Director of PW - Solid Waste $249.59 640: Sewer M & O Fund 640 - Environmental Compliance Inspector $140.75 640: Sewer M & O Fund 640 - Instrument Technician/Electrician $115.88 640: Sewer M & O Fund 640 - Laboratory Supervisor $186.29 640: Sewer M & O Fund 640 - Laboratory Technician I $109.24 640: Sewer M & O Fund 640 - Laboratory Technician II $121.63 640: Sewer M & O Fund 640 - Laboratory Technician III $134.13 640: Sewer M & O Fund 640 - Lead Laboratory Technician $147.84 640: Sewer M & O Fund 640 - Lead Wastewater Maintenance Worker $126.63 640: Sewer M & O Fund 640 - Maintenance Planner/Schedulee $140.97 640: Sewer M & O Fund 640 - Senior Environmental Compliance Inspector $147.84 640: Sewer M & O Fund 640 - Senior Instrument Technician $127.89 640: Sewer M & O Fund 640 - Utilities Mechanic $115.88
640: Sewer M & O Fund 640 - Utilities Technical Services Manager $198.56 640: Sewer M & O Fund 640 - Wastewater Collection System Supervisor $177.34 640: Sewer M & O Fund 640 - Wastewater Maintenance Supervisor $186.29 640: Sewer M & O Fund 640 - Wastewater Superintendent $208.56 640: Sewer M & O Fund 640 - Wastewater Maintenance Worker I $90.95 640: Sewer M & O Fund 640 - Wastewater Maintenance Worker II $100.15 640: Sewer M & O Fund 640 - Wastewater Maintenance Worker III $110.44 640: Sewer M & O Fund 640 - Wastewater Plant Operator I $127.89 640: Sewer M & O Fund 640 - Wastewater Plant Operator II $140.97 640: Sewer M & O Fund 640 - Wastewater Plant Operator III $155.33 660: Solid Waste Fund 660 - Customer Service Representative $98.21 660: Solid Waste Fund 660 - Lead Solid Waste Collection Worker $125.27 660: Solid Waste Fund 660 - Solid Waste Coordinator $114.29 660: Solid Waste Fund 660 - Solid Waste Equipment Operator I $95.96 660: Solid Waste Fund 660 - Solid Waste Equipment Operator II $105.67 ATTACHMENT 1
21 Comprehensive User Fee Study
City of Manteca - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
660: Solid Waste Fund 660 - Solid Waste Equipment Operator III $116.53 660: Solid Waste Fund 660 - Solid Waste Manager $211.61 660: Solid Waste Fund 660 - Solid Waste Specialist $134.94 660: Solid Waste Fund 660 - Solid Waste Utility Worker $116.53 680: Water M & O Fund 680 - Administrative Assistant II $119.97 680: Water M & O Fund 680 - Chief of Water Operations $252.59 680: Water M & O Fund 680 - Deputy Director of PW - Water Resources $299.28 680: Water M & O Fund 680 - Meter Reader I $98.83
680: Water M & O Fund 680 - Meter Reader II $109.06
680: Water M & O Fund 680 - Utilities Technical Services Manager $238.09 680: Water M & O Fund 680 - Water Distribution Supervisor $207.94 680: Water M & O Fund 680 - Water Distribution Operator I $153.35 680: Water M & O Fund 680 - Water Distribution Operator II $169.03 680: Water M & O Fund 680 - Water Distribution Operator III $186.25 680: Water M & O Fund 680 - Water Meter Services Supervisor $197.93 680: Water M & O Fund 680 - Water Regulatory Compliance Specialist I $120.08 680: Water M & O Fund 680 - Water Regulatory Compliance Specialist II $132.43 680: Water M & O Fund 680 - Water Regulatory Coordinator $153.35 680: Water M & O Fund 680 - Water Resource Coordinator $135.67 680: Water M & O Fund 680 - Water Systems Maintenance Worker I $109.06 680: Water M & O Fund 680 - Water Systems Maintenance Worker II $120.08 680: Water M & O Fund 680 - Water Systems Maintenance Worker III $132.43 680: Water M & O Fund 680 - Water Treatment Operations Supervisor $223.37 680: Water M & O Fund 680 - Water Treatment Operator $186.25 680: Water M & O Fund 680 - Well Mechanic/Operator I $145.94 680: Water M & O Fund 680 - Well Mechanic/Operator II $161.05 810: Engineering Fund 810 - Administrative Analyst $124.09 810: Engineering Fund 810 - Administrative Assistant III $109.72 810: Engineering Fund 810 - Assistant Engineer $160.11
810: Engineering Fund 810 - Associate Engineer $179.11
810: Engineering Fund 810 - Deputy Director of Engineering $248.21 810: Engineering Fund 810 - Director of Engineering $318.46 810: Engineering Fund 810 - Engineering Technician I $107.13 810: Engineering Fund 810 - Engineering Technician II $118.09 810: Engineering Fund 810 - Engineering Technician III $130.25 810: Engineering Fund 810 - Public Works Deputy Director-Engineering $248.21 810: Engineering Fund 810 - Senior Construction Inspector $143.50 810: Engineering Fund 810 - Senior Engineer $230.92
810: Engineering Fund 810 - Senior Engineering Technician $143.50 830: Information Technology Fund 830 - Applications Specialist/Public Safety $116.51 830: Information Technology Fund 830 - Director of IT & Innovation $267.95 830: Information Technology Fund 830 - GIS Analyst $129.74 ATTACHMENT 1
22 Comprehensive User Fee Study

City of Manteca - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
830: Information Technology Fund 830 - GIS Assistant $84.95 830: Information Technology Fund 830 - GIS Specialist I $120.73 830: Information Technology Fund 830 - GIS Specialist II $133.01 830: Information Technology Fund 830 - Information Technology Operations Manager $214.03 830: Information Technology Fund 830 - IT System Engineer $128.46 830: Information Technology Fund 830 - Network Technician I $105.74 830: Information Technology Fund 830 - Network Technician II $116.51 830: Information Technology Fund 830 - Security Analyst $128.46 ATTACHMENT 1
23 Comprehensive User Fee Study
Appendix C – Cost Recovery Analysis
The following tables provide the results of the analysis, resulting full cost recovery amount, and recommended fees. For fees, services, and penalties in which the full cost, existing fee and suggested fee is listed as “NA”, the amount or percentage was not calculable based on cost data or variable fee structure.

This is most common when either the current or the suggested fee includes a variable component that is not comparable on a one-to-one basis, a full cost was not calculated (for penalties, fines, market-based fees, or items not included in the study), or when there is not a current fee amount to compare against.

All services and fees analyzed as part of this study fall under one or multiple categories one through five of the exemptions defined in Proposition 26. As such a cost analysis was performed to calculate the estimated reasonable full cost of each service, and suggested fees are recommended at or below those amounts.

Estimated reasonable full costs were calculated based on City expenditures and time estimates.

ATTACHMENT 1
Engineering
# Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 1 PLAN CHECK:2 Plan Check 0-$500,000 Eng. Cost Est. (or 3% whichever is less) 5,413.00 $7,493.00 0% $7,493.00 $2,080 3 Plan Check $500,000 or greater (Engineers Cost Estimate)

1.02% of
Engineers Cost
Estimate

2.43% 0% 2.43% 1.41%
4 Master Plans (per acre) 95.00 $169.02 0% $169.00 $74
5 Plan check after 3rd Submittal Hourly Rate NA NA Hourly Rate $0 6 Post-Construction Manual Compliance (MS-4), Commercial, Industrial, Multi-Family 3,016.00 $5,600.16 0% $5,600.00 $2,584 7 Post-Construction Manual Compliance (MS-4), Single Family Residential 268.00 $519.56 0% $520.00 $252 8 CONSTRUCTION INSPECTION:9 Inspection 0-$500,000 Eng. Cost Est. (or 6% whichever is less) 13,609.00 $18,441.37 0% $18,441.00 $4,83210 Inspection $500,000 or greater (Engineers Cost Estimate)

1.81% of
Engineers Cost
Estimate

3.18% 0% 3.18% 1.37%
11 DOCUMENT REVIEW
12 Final Parcel Map Processing Fee (Manteca Admin fee on top of County fee) 479.00 $791.11 0% $791.00 $312
13 Legal Description (easements, dedications, etc) 638.00 $902.03 0% $902.00 $26414 Survey monument preservation (per Corner Record) 102.00 $201.29 0% $201.00 $9915 Elevation Certificate Review 303.00 $384.14 0% $384.00 $8116 Submittal Review New $480.34 0% $480.00 NA 17 PERMIT PROCESSING
18 Encroachment Permit (without traffic control) 159.00 $365.03 0% $365.00 $206 19 Encroachment Permit with Traffic Control Plan (one day of work) 305.00 $725.07 0% $725.00 $420 Encroachment Permit (w/ Road Closure) New $1,197.02 0% $1,197.00 NA 20 Encroachment Permit with Traffic Control Plan (each additional day) 89.00 $164.35 0% $164.00 $75 21 Encroachment Permit (Special)
Deposit Required
Based On
Engineering Est.

NA NA
Deposit Required
Based On
Engineering Est.
$0
22 Transportation Permit - single State Sets NA NA State Sets $0 23 Encroachment Permit - USA Marking Residential per 200 ft. New $211.37 0% $211.00 NA24 Encroachment Permit - USA Marking Commercial per 200 ft. New $423.12 0% $423.00 NA25 Transportation Permit - single State Sets NA NA State Sets $026 Transportation Permit - annual State Sets NA NA State Sets $0 27 MISCELLEANOUS28 Due diligence meeting (engineering support to entitled projects) (hourly - first hour/ no charge) 197.00 NA NA Hourly Rate $0

ATTACHMENT
1 Engineering
# Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 29 ENGINEERING PRODUCTIVE HOURLY RATES BY POSITION:30 Director of Engineering/City Engineer 197.00 $318.46 0% $318.00 $12131 Deputy Director of Engineering New $248.21 0% $248.00 NA32 Senior Engineer New $232.07 0% $232.00 NA33 Associate Engineer New $179.11 0% $179.00 NA34 Engineering Tech 94.00 $107.13 0% $107.00 $1335 Assist Engineer 124.00 $160.11 0% $160.00 $3636 Construction Inspector 120.00 $148.00 0% $148.00 $2837 Driveway 89.00 $122.16 0% $122.00 $33 38 Curb/Gutter/Sidewalk - replace / repair (per 20 L.F. or portion thereof) 29.00 $41.05 0% $41.00 $12 39 Trench Cut (each) - per 25 L.F. or portion thereof (based on longest cut dimension), 5 ft depth max 148.00 $204.01 0% $204.00 $56 40 Trench Cut (each) - per 25 L.F. or portion thereof (based on longest cut dimension), >5 ft depth 267.00 $366.48 0% $366.00 $9941 Temporary water permit New $60.10 0% $60.00 NA 42 ENGINEERING DIVISOIN FEES FOR ENTITLEMENT PROJECTS *These fees are in addition to the Planning Division Fees 43 ANNEXATION
44 Annexation (LAFCo Fees Not Included) New $3,194.36 0% $3,194.00 NA 45 DEVELOPMENT AGREEMENT
46 Development Agreement New $2,990.10 0% $2,990.00 NA
47 DA Amendment (Administrative Review) New $1,429.04 0% $1,429.00 NA48 DA Amendment (Public Hearing) New $1,925.02 0% $1,925.00 NA49 ENVIRONMENTAL 50 Environmental Impact Report 1,182.00 $1,938.18 0% $1,938.00 $756 51 MISCELLEANOUS52 Lot Line Adjustment/Reversion to Acreage 1,231.00 $1,435.07 0% $1,435.00 $204 53 Certificate of Compliance 886.00 $1,460.49 0% $1,460.00 $57454 Entitlement Extension New $796.09 0% $796.00 NA55 PLANNED DEVELOPMENT56 Planned Development 0-10 Acres 472.00 $1,008.20 0% $1,008.00 $53657 Planned Development Greater than 10 Acres New $1,008.20 0% $1,008.00 NA58 Planned Development Amendment (Administrative Decision) New $565.08 0% $565.00 NA59 Planned Development Amendment (Public Hearing) New $923.07 0% $923.00 NA60 SITE PLAN REVIEW:61 Preliminary Staff Review (amount credited to project application) 497.00 $792.00 0% $792.00 $295 62 Site Plan Review - Res. 2-4 units 1,273.00 $1,659.08 0% $1,659.00 $386 63 Site Plan Review - Res. 5 or more units 1,273.00 $2,568.14 0% $2,568.00 $1,29564 Site Plan Review - Non Residential - 5 acres or less 1,273.00 $1,659.08 0% $1,659.00 $386

ATTACHMENT
1 Engineering
# Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 65 Site Plan Review - Non-Residential. - Greater than 5 acres 1,916.00 $2,568.14 0% $2,568.00 $65266 Minor Plan Modification/Minor Site Plan 409.00 $552.04 0% $552.00 $14367 SPECIFIC PLANS:68 Specific Plan/Master Plan Prep. Processing & Review (Staff admin. Fee Only. Does not include consultant cost) 11,399.00 $14,300.00 0% $14,300.00 $2,90169 Specific Plan/Master Plan Amendment Major 3,244.00 $4,165.11 0% $4,165.00 $92170 Specific Plan/Master Plan Amendment Minor 1,770.00 $2,318.10 0% $2,318.00 $54871 SUBDIVISIONS:72 Tentative Parcel Map 788.00 $1,740.05 0% $1,740.00 $95273 Tentative Map 5-50 lots 944.00 $3,622.26 0% $3,622.00 $2,67874 Tentative Map Greater than 50 lots 1,068.00 $5,497.24 0% $5,497.00 $4,42975 Tentative Map Extension New $796.09 0% $796.00 NA76 USE PERMITS:77 Conditional Use Permit 267.00 $357.06 0% $357.00 $9078 Minor Use Permit 267.00 $357.06 0% $357.00 $90 79 Temporary Use Permit 164.00 $228.00 0% $228.00 $64

ATTACHMENT
1 Building
# Fee Code Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 1 TOTAL VALUATION-BUILDING PERMIT FEES2 New Const Permit Residential & Commercial New Construction and Additions (Permit Fee) 0.47% Permit Fee, % of valuation 0.80% 0% 0.80% 0.33% 3 New Const PC
Residential & Commercial New Construction and Additions (Plan Review Fee) 85% of permit fee Plan review Fee Variable, valuation NA 85% of permit fee $0 4 Remodel Permit Residential Remodels and Commercial TI's (Permit Fee) 0.47% Permit Fee, % of valuation 0.80% 0% 0.80% $0 5 Remodel PC Residential Remodels and Commercial TI's (Plan Review Fee) 85% of permit fee Plan review Fee Variable, valuation NA 85% of permit fee $0 6 Permit Admin Permit Administration Fee 70.00 Flat $364.30 0% $364.00 $2947 - Minimum Permit Fee 560.00 Flat $126.80 1% $126.00 -$4348 SINGLE9 SFD Prod Repeat Single Family Production Repeat 0.47% Permit Fee, % of valuation 0.80% 0% 0.80% 0.33% 10 SFD Repeat Admin Production Repeat Single Family Dwelling Administrative Fee 305.00 Flat $364.30 0% $364.00 $59 11 MWELO Residential MWELO Landscape Fee - Residential 11% of permit fee % of Permit Fee, MWELO Fee Variable, valuation NA 11% of permit fee $0 12 Plot Plan Rev Plot Plan Revision 70.00 Per app $77.52 1% $77.00 $7 13 Master Plan PC Master Plan Check Fees (SFD Track Housing) 1.41% Plan check, % of valuation 2.40% 0% 2.40% 0.99% 14 RESIDENTIAL15 Bathroom Remodel Bathroom Remodel Or Repair 255.00 Per app $286.97 0% $286.00 $3116 CMU Wall Res CMU Wall (First 100 Lf) 395.00 Per app $453.55 0% $453.00 $5817 CMU Wall (Each Additional 100 Lf) 128.00 Per app $143.49 0% $143.00 $15 18 Electrical App Electrical Appliances 79.00 Per app $73.67 1% $73.00 -$619 Electrical Circ Electrical Circuits (First) 100.00 Per app $90.51 1% $90.00 -$1020 Electrical Circuits (Each Additional) 12.00 Per app $12.73 6% $12.00 $0 21 Elec Panel Res Electrical Panels 112.00 Per app $119.37 0% $119.00 $7 22 EV Charg Station EV Charging Station 336.00 Per app $311.32 0% $311.00 -$25 23 Fence Fence 205.00 Per app $233.97 0% $233.00 $28
24 Fireplace Insert Fireplace Insert 137.00 Per app $130.30 0% $130.00 -$725 Flag Pole Res Flag Pole 314.00 Per app $351.95 0% $351.00 $37 26 Gas Piping Gas Piping System 152.00 Per app $146.21 0% $146.00 -$627 Grading Permit Grading Permit Fee (Building Admin Department) 35.00 Per app $38.76 2% $38.00 $3 28 Spa/Hot Tub Port Hot Tub / Spa Portable 75.00 Per app $74.64 1% $74.00 -$129 HVAC Residential HVAC System Replacement 75.00 Per app $79.58 1% $79.00 $4 30 Kitchen Remodel Kitchen Remodel Or Repair (W/O Structural Modifications) 292.00 Per app $326.76 0% $326.00 $3431 Misc Insp Res Misc. Inspection 110.00 Per app $122.27 0% $122.00 $12 32 Misc. Each Additional Inspection 75.00 Per app $79.58 1% $79.00 $4 33 Patio Cover Patio Covers & Gazebos 357.00 Per app $413.76 0% $413.00 $56 34 Patio Cover ICC Patio Covers & Gazebos (ICC/IAPMO Approved) 165.00 Per app $183.27 0% $183.00 $18 35 Plumbing Fixture Plumbing Fixture 38.00 Per app $39.79 2% $39.00 $1 36 Reroof Resident Re-Roof Residential 112.00 Per app $119.37 0% $119.00 $7 37 Sewer Repair Sewer Repair 75.00 Per app $79.58 1% $79.00 $4 38 Shed Shed 509.00 Per app $573.95 0% $573.00 $64

ATTACHMENT
1 Building
# Fee Code Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 39 Shower/Bath Rep Shower / Bathtub Replacement 120.00 Per app $122.39 0% $122.00 $2 40 Solar PV Resid Solar Photovoltaic - Residential (Rooftop) 383.00 Per app $378.93 0% $378.00 -$5 41 Solar Pool Heat Solar Pool Heating System 117.00 Per app $109.13 0% $109.00 -$8 42 Stucco / Siding Stucco or Siding 112.00 Per app $119.37 0% $119.00 $7 43 Swimming Pool Swimming Pool (No Master Plan) 576.00 Per app $645.85 0% $645.00 $69 44 Swimming Pool MP Swimming Pool Master Plan 246.00 Per app $294.40 0% $294.00 $48 45 Swim Pool w/ MP Swimming Pool With Approved Master Plan 331.00 Per app $339.91 0% $339.00 $8 46 Temp Power Pole Temp Power Pole 38.00 Per app $39.79 2% $39.00 $1 47 Ventilation Fan Ventilation Fan 75.00 Per app $79.58 1% $79.00 $4 48 Water Heater Water Heater Replacement - (Like For Like) 75.00 Per app $79.58 1% $79.00 $449 Water Piping Sys Water Piping System 152.00 Per app $146.21 0% $146.00 -$650 Water Softener Water Softener 75.00 Per app $79.58 1% $79.00 $4 51 Window Replace Window Replacements (First 5 Windows) 55.00 Per app $58.41 1% $58.00 $3 52 Window Replacements (Each Additional Window) 12.00 Per app $12.73 6% $12.00 $053 Permit Admin Permit Administration Fee 70.00 Flat $77.52 1% $77.00 $754 Reisdential Energy Storage System
New $304.17 0% $304.00 NA
55 COMMERCIAL56 Awning Awning (First) 215.00 Per app $246.15 0% $246.00 $31 57 Awning (Each Additional) 60.00 Per app $69.27 0% $69.00 $9 58 Cell Tower Cell Tower 726.00 Per app $774.35 0% $774.00 $48 59 CMU Wall Com CMU Wall (First 100 Lf) 469.00 Per app $533.13 0% $533.00 $64 60 CMU Wall (Each Additional 100 Lf) 224.00 Per app $238.73 0% $238.00 $14 61 Commercial Coach Commercial Coach 490.00 Per app $553.54 0% $553.00 $63 62 Electric Pan Com Electrical Panel 199.00 Per app $181.02 0% $181.00 -$18 63 Flag Pole Com Flag Pole 327.00 Per app $365.16 0% $365.00 $38 64 HVAC Commercial HVAC System Replacement 75.00 Per app $79.58 1% $79.00 $4 65 HVAC Replacement - Each Additional 45.00 Per app $42.81 2% $42.00 -$3 66 Misc Insp Com Misc. Inspection (1 Stop) 116.00 Per app $113.46 0% $113.00 -$3 67 Misc. Inspection (Each Additional Inspection) 75.00 Per app $79.58 1% $79.00 $468 Solar PV Com Photovoltaic System - Up To 50 kW 950.00 Per app $1,698.83 41% $1,000.00 $5069 Photovoltaic System - Each Additional Kw. (51-250kW) 7.00 Per app $71.15 90% $7.00 $069 Photovoltaic System - Each Additional Kw. (251+kW) New Per app $71.15 93% $5.00 NA70 Reroof Com Reroof - First 10 Squares 112.00 Per app $119.37 0% $119.00 $7 71 Reroof - Each Additional 10 Squares 38.00 Per app $39.79 2% $39.00 $1 72 Sewer Repair Sewer Repair 75.00 Per app $79.58 1% $79.00 $4 73 Sign - Free/Pole Sign - Free Standing / Pole 285.00 Per app $335.21 0% $335.00 $50 74 Sign - Illumin Sign (Illuminated) 280.00 Per app $247.18 0% $247.00 -$33 75 Sign - Non Illum Sign (Non-Illuminated) 180.00 Per app $207.40 0% $207.00 $27 76 Storage Racking Storage Racking (First Rack per type) 314.00 Per app NA NA $314.00 $0 77 Storage Racking (Each additional 5 racks per type) 157.00 Per app NA NA $157.00 $0 78 Swim Pool Com < Swimming Pool - Less Than 1000 Sf 909.00 Per app $1,018.03 0% $1,018.00 $109 79 Swim Pool Com > Swimming Pool - Over 1000 Sf 1,132.00 Per app $1,256.76 0% $1,256.00 $124 80 Tank Install Tank Installation 180.00 Per app $207.40 0% $207.00 $27 81 Temp Power Pole Temp Power Pole 38.00 Per app NA NA $38.00 $082 Water Heater Water Heater Replacement - (Like For Like) 75.00 Per app NA NA $75.00 $0

ATTACHMENT
1 Building
# Fee Code Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 83 Permit Admin Permit Administration Fee 70.00 Flat NA NA $70.00 $084 OTHER/MISCELLANEOUS FEES 85 Board Appeals Ap Board Of Appeals Application Fee 1,487.00 Per app $1,801.48 0% $1,801.00 $314 86 Bus Lic Inspect Business License Inspection 90.00 Per app $122.23 0% $122.00 $32 87 Fee Deferral Fee Deferral 441.00 Per app $347.10 0% $347.00 -$94 88 Add Plan Check Fee For Additional Plan Checking And For Plan Revisions: (Actual Cost) 246.00 Per hour $294.40 0% $294.00 $48 89 Misc Insp hr Misc. Inspection (Hourly Rate) 149.00 Per hour $159.15 0% $159.00 $10 90 Misc PC hr Misc. Plan Check (Hourly Rate) 211.00 Per hour $255.64 0% $255.00 $44 91 Permit Reissue Permit Reissuance (Permits expired less than 1 Year with no changes to plans) 327.00 Per app $407.07 0% $407.00 $80 92 Permit/App Exten Permit Extension / Application Extension (Subject to approval of Building Official) 63.00 Per app $75.79 1% $75.00 $12 93 Plan Retention Plan Retention / Technology Fee 5% of permit fees Per app NA NA 5% of permit fees $0 94 Reinspection Reinspection Fee 110.00 Per unit $118.34 0% $118.00 $8 95 Outside Reg Hour Service Requested Outside Of Regular Working Hours (3 Hour Min) 670.00 Per app $716.19 0% $716.00 $46 96 Spec Insp App Special Inspection Application (For City List) 211.00 Per app $255.64 0% $255.00 $44 97 - For services required but not listed above (at the applicable hourly rate) Hourly Rate NA NA Hourly Rate $098 DEMOLITION PERMIT FEES99 Small Res Demo Small Residential (i.e. Patio Cover, Shed, etc.) 50.00 Per app $52.52 1% $52.00 $2100 Single Fam Demo Single Family Dwelling 110.00 Per app $118.34 0% $118.00 $8 101 Commercial Demo Commercial Demolition 320.00 Per app $373.97 0% $373.00 $53 102 Demo Tank Demolition Permits for Removal Of Underground Tanks 149.00 Per app $159.15 0% $159.00 $10 103 Multi Fam Demo Multifamily Demolition 2,925.00 Per app $373.97 0% $373.00 -$2,552 104 HOURLY RATES BY POSITION105 Hour by Position Chief Building Official 249.00 per hour $303.17 0% $303.00 $54106 Senior Plan Check Engineer 211.00 per hour $255.64 0% $255.00 $44107 Building Inspector 149.00 per hour $159.15 0% $159.00 $10 108 Development Services Technician 140.00 per hour $155.03 0% $155.00 $15109 PLANNING DIVISION FEES APPLICABLE TO BUILDING PERMITS 110 Plan Com M-F/Mix Commercial, Multi-Family, Mixed (New) 1,038.00 Per app $1,669.48 0% $1,669.00 $631111 Plan Com TI-Occ Commercial (Tenant Infill - Occupancy) 249.00 Per app $417.37 0% $417.00 $168 112 Plan Res Add Residential (Addition - Minor) 111.00 Per app $166.95 1% $166.00 $55 113 Plan SFD Plot Pl Single Family Dwelling (Tract - Plot Plan) 48.00 Per app $96.60 1% $96.00 $48 114 Plan Signs Signs 166.00 Per app $250.42 0% $250.00 $84 115 Plan MP Review Residential Master Plan - Plan Review 408.00 Per app $667.79 0% $667.00 $259116 Plan Long Range Long Range Planning Surcharge (per square foot, all new construction) 0.20 Per Sq. Ft. $0.24 1% $0.24 $0117 MWELO Resi MWELO Landscape Fee - Residential (if applicable) 11% of permit fee MWELO Fee NA NA 11% of permit fee $0 118 MWELO Com MWELO Landscape Fee - Commercial (if applicable) 5% of permit fee MWELO Fee NA NA 5% of permit fee $0

ATTACHMENT
1 Planning
# Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 1 ANNEXATION:2 Annexation 10,300.00 $10,501.24 0% $10,501.00 $201 3 LAFCO Fees — ref. LAFCO fee schedule4 Prezone/Rezone 0-5 acres 9,295.00 $9,301.94 0% $9,301.00 $6 5 Prezone/Rezone greater than 5 acres 15,605.00 $15,724.35 0% $15,724.00 $119 6 APPEALS:7 Appeal (applicant or non-applicant) 3,083.00 $3,148.61 0% $3,148.00 $65 8 BUILDING PLAN CHECK & INSPECTION:9 Commercial, Multi-Family, Mixed 1,038.00 $1,094.57 0% $1,094.00 $5610 Commercial (TI - Occupancy) 249.00 $289.81 0% $289.00 $40 11 Residential (Addition - Minor) 111.00 $128.87 1% $128.00 $1712 Single Family Dwelling (Tract - Plot Plan) 48.00 $51.78 2% $51.00 $3 13 Residential Master Plan 408.00 $409.34 0% $409.00 $1 14 DEVELOPMENT AGREEMENT:
15 Development Agreement 3,383.00 $21,785.24 0% $21,785.00 $18,402 16 DA Amendment (Administrative Review) 1,973.00 $7,578.93 0% $7,578.00 $5,605 17 DA Amendment (Legislative Review) 2,821.00 $14,593.90 0% $14,593.00 $11,772 18 DA Annual Review 1,973.00 $3,031.71 0% $3,031.00 $1,058 19 ENVIRONMENTAL:20 Mitigation Monitoring and Reporting Program - EIR Only 4,775.00 $4,812.85 0% $4,812.00 $37 21 Environmental Impact Report (Staff admin fee only. Does not include Consultant cost) 22,532.00 $22,961.25 0% $22,961.00 $429 22 Initial Study-Negative Declaration (Staff admin fee only. Does not include Consultant cost) 14,489.00 $14,757.58 0% $14,757.00 $268 23 Initial Study-Negative Declaration (Staff prepared. Does not include Consultant cost of supporting studies) 21,737.00 $22,179.84 0% $22,179.00 $442 24 Environmental Determination 557.00 $607.46 0% $607.00 $50 25 GENERAL PLAN:
26 General Plan Amendment 13,172.00 $13,454.50 0% $13,454.00 $282 27 MISC:28 Business License Planning Review Fee 73.00 $128.13 0% $128.00 $55 29 Certificate of Compliance 532.00 $1,169.55 0% $1,169.00 $637 30 Condo Conversion 9,836.00 $9,947.47 0% $9,947.00 $11131 Home Occupation Permit 109.00 $197.31 0% $197.00 $88 32 Lot Line Adjustment/Reversion to Acreage 2,200.00 $2,350.14 0% $2,350.00 $150 33 Williamson Act Cancellation 13,724.00 $14,027.98 0% $14,027.00 $303 34 Large Family Daycare 146.00 $193.21 0% $193.00 $47

ATTACHMENT
1 Planning
# Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 35 PLANNED DEVELOPMENT:36 Planned Development 0-10 Acres 12,525.00 $12,774.18 0% $12,774.00 $249 37 Planned Development greater than 10 acres 14,184.00 $14,504.49 0% $14,504.00 $32038 PD Amendment (Administrative Decision) 3,927.00 $4,015.16 0% $4,015.00 $88 39 PD Amendment (Legislative Decision) 7,834.00 $8,002.24 0% $8,002.00 $168 40 LONG RANGE PLANNING:41 Long Range Planning Surcharge (Per SF, New Construction) 0.20 $0.24 0% $0.24 $0 42 Long Range Planning Surcharge (Per SF, Commercial New Construction) 0.20 $0.24 0% $0.24 $0 43 SEWER ALLOCATION:
44 Point Rating Application Residential 1,022.00 $1,084.93 0% $1,084.00 $62 45 SIGN PERMITS:46 Subdivision Temporary Sign Permit 312.00 $348.24 0% $348.00 $36 47 Master Sign Program 1,630.00 $1,821.80 0% $1,821.00 $191 48 Major Sign Permit 166.00 $193.21 0% $193.00 $27
49 Temporary Sign Permit 85.00 $103.87 1% $103.00 $1850 Portable Sign Permit 85.00 $103.87 1% $103.00 $1851 SITE PLAN REVIEW:
52 Preliminary Staff Review (amount credited to project application) 1,011.00 $1,080.14 0% $1,080.00 $69
53 Site Plan Review - Residential 2-4 units 5,423.00 $5,791.08 0% $5,791.00 $368 54 Site Plan Review - Residential 5 or more units 9,863.00 $10,527.15 0% $10,527.00 $664 55 Site Plan Review - Non-Residential 5 acres or less 7,320.00 $7,834.51 0% $7,834.00 $514 56 Site Plan Review - Non-Residential greater than 5 acres 11,991.00 $12,011.32 0% $12,011.00 $20 57 Minor Plan Modification / Minor Site Plan 3,792.00 $4,135.90 0% $4,135.00 $343 58 Major Plan Adjustment New $512.58 0% $512.00 NA
59 Minor Plan Adjustment New $263.70 0% $263.00 NA60 SPECIFIC PLANS:61 Specific Plan / Master Plan Amendment Major 8,481.00 $8,668.77 0% $8,668.00 $187 62 Specific Plan / Master Plan Amendment Major 5,683.00 $5,778.18 0% $5,778.00 $95 63 Specific Plan / Master Plan (Staff admin. fee only. Does not include Consultant cost) 34,056.00 $34,707.72 0% $34,707.00 $651 64 STORAGE CONTAINERS PERMITS:65 Permanent Storage Container Permit 166.00 NA NA $166.00 $0 66 Temporary Storage Container Permit 85.00 NA NA $85.00 $067 SUBDIVISIONS:68 Tentative Parcel Map 5,420.00 $5,733.63 0% $5,733.00 $313 69 Tentative Subdivision Map 5-50 lots 12,181.00 $12,299.88 0% $12,299.00 $118 70 Tentative Subdivision Map greater than 50 lots 14,592.00 $14,647.91 0% $14,647.00 $55

ATTACHMENT
1 Planning
# Description Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Notes 71 Tentative Map Extension 3,521.00 $3,531.03 0% $3,531.00 $10 72 USE PERMITS:73 Conditional Use Permit - New Construction 9,247.00 $9,291.27 0% $9,291.00 $4474 Conditional Use Permit - Existing 9,247.00 $1,530.92 0% $1,530.00 -$7,717 75 Minor Use Permit 3,507.00 $3,718.59 0% $3,718.00 $21176 Temporary Use Permit 404.00 $477.85 0% $477.00 $73 77 ZONING:
78 Minor Zone Modification 2,708.00 $2,907.47 0% $2,907.00 $199 79 Variance 10,726.00 $10,786.10 0% $10,786.00 $60
80 Zoning Text Amendment 11,573.00 $11,820.41 0% $11,820.00 $24781 Zoning Research Letter 219.00 $289.81 0% $289.00 $70 82 ENGINEERING PLAN CHECK AND INSPECTION:
83 Final map/improvement plan review For services required but not listed above (at the applicable hourly rate) 930.00 $929.19 0% $929.00 -$1 Consultant fees at cost plus 15% admin fee 84 PLANNING PRODUCTIVE HOURLY RATES BY POSITION:85 CD Director 249.00 $303.17 0% $303.00 $54 86 Planning Manager 271.00 $281.98 0% $281.00 $10
87 Senior Planner 240.00 $243.55 0% $243.00 $3
88 Associate Planner 224.00 $221.04 0% $221.00 -$3
89 Assistant Planner 166.00 $193.21 0% $193.00 $27
90 Admin Assistant III 146.00 $155.03 0% $155.00 $9

ATTACHMENT
1 27368 Via Industria, Suite 200
Temecula, California 92590-4856
800.755.6864 | Fax: 888.326.6864
951.587.3500 | Fax: 951.587.3510
www.willdan.com