Please remit payment to address below:

Project Resources Group, Inc.

Attn: Relocation Payments
5690 DTC Blvd., Suite 650E
Greenwood Village, CO 80111
Recovery # 832-948-4730
* Initial below to accept payment
terms *

INTERIM ESTIMATED

INVOICE
*** Payment for these amounts is
due within fifteen (15) days from the
date of the interim invoice ***
FRELO / Relocation Project Interim Estimated Invoice Agreement Company Name:
authorizes the cost amount(s) provided by Project Resources Group care of:

Comcast FRELO of Comcast's utilities at:

Mckinley Ave, Manteca CA 95337
for FRELO of facilities at address location: Project Number:

Mckinley Ave, Manteca CA 95337 JB0000672243
External Labor - Estimate Internal Labor - Estimate Materials - Estimate Internal Burden - Estimate $160,426.15 $6,749.70 $40,005.53 $0.00
Footage Coax/Fiber Permits Previous Payment
0 Coax $0.00 $0.00
*** All materials / cable plant is owned and maintained by Comcast *** FRELO Invoice #: 260416 The agreement will expire in 30 days if not signed.

PRG Project Coordinator: Kayla Danler Interim Invoice Date Expiration Date Estimated Invoiced Costs: $207,181.38 February 27, 2023 March 29, 2023 Company Name:

Payment for the Estimated
Costs is due within fifteen
(15) days from the date of
the interim invoice.

Billing Address:

Phone:

Email:

Name & Title
Date:

Signature:

AP Contact Name:

Accounts Payable Email:

Accounts Payable Phone:

By signing this agreement, you acknowledge that you are authorized to sign on the Customer's behalf and acknowledge that the Customer agrees to the reasonableness of Comcast's estimated amounts indicated above on or after the indicated date. This is an agreement to reimburse Comcast for the estimated amounts above on the stated project only and does not provide authorization for any additional cost(s) unrelated to the stated project.

This is an Interim Estimated Invoice. The document details the estimated cost as issued by our client. Once the project has been completed, a final invoice will be issued reflecting the actual construction costs, less the amount paid above. Should the project exceed 20% of the estimated costs before completion, a revised agreement will be issued. You will be liable and invoiced for the actual construction costs, once completed.

Exhibit "A" ATTACHMENT 3
External Labor - Estimate
Materials - Estimate
Estimate Creation 1 EACH
Field Walkout/Strand Trench Mapping - Coax and/or Fiber <2,000 Ft 1 EACH "Drafting Base Map Strand and Trench Information <2,000'"-Drafting Base Map Strand and Trench Information <2,000' 1 EACH Drafting Base Map Strand and Trench Information greater than 2000' (drafted in Spatial)-Drafting Base Map Strand and Trench Information >2,000' (Has To Be Drafted In Spatial) 739 FOOT System Design - RF and Fiber Design and Draft for Forced Relocates - Base per project <2,000'-System Design - RF and Fiber Design and Draft for Forced Relocates - Base per project <2,000'2 EACH System Design - RF and Fiber Design and Draft for Forced Relocates - Base + per foot >2,000' 8626 FOOT Walkout for Permit Fielding <300 Ft Complex 2 EACH
Permit Application within 300 Ft Complex 2 EACH
System Design - RF and Fiber Design and Draft for Forced Relocates - Base per project <2,000' 1 EACH Walkout for Permit Fielding greater than 300' Complex Underground 4910 FOOT Permit Application greater than 300 Ft Complex Underground 4910 FOOT Walkout for Permit Fielding <300 Ft Complex 1 EACH
P12-1 PG-Traffic Control Grade C QUOTE
P11-FEE + 10%-Permit Payments Through 3rd Party QUOTE
Place Conduit in Joint Trench for Coax/Fiber 9231 FOOT
Install Medium 18"x24"x24" Vault 9 EACH
Install Large 36"x48"x30" Vault 1 EACH
Fiber Optic Cable Strand Continuity Verification 1 EACH Fiber Optic Cable Strand Continuity Verification 3 EACH Splice Enclosure Audit (Separate Trip) 1 EACH
Fiber Enclosure Re-Entry 8 EACH
Pull Coax, Fiber or Innerduct Separate Trip 2528 FOOT
Proof Existing Conduit 3092 FOOT
Splice Active Device 5 EACH
Splice Splitter/DC 1 EACH
Install LE/MB Pedestal 3 EACH
Install Node/DA Pedestal 2 EACH
Pull Coax, Fiber or Innerduct Separate Trip 11372 FOOT
Node Optimization 1 EACH
Hang/Mount Node and Splice Fiber Only 1 EACH
Splice Coax to Existing Node (Separate Trip Only) 1 EACH Dig Up and Repair and Restore 6 EACH
Span Placement 4" Directional Bore (SMB, MetroE, Fiber Deep) 660 FOOT Hand Dig 36" Cover - Requires Preapproval from Comcast 15 FOOT Hard Surface Pot Hole 3 EACH
Fiber Enclosure Mid-Entry - New Cable - Aerial 1 EACH
Fiber Enclosure Mid-Entry - New Cable - Underground 3 EACH Install New Splice Enclosure - Underground 1 EACH
Splice Loose Tube Fiber (Per Fusion 97 or Greater) 578 EACH Splice Loose Tube Fiber (Per Fusion 49-96) 53 EACH
Fiber Enclosure Aerial - Delash / Relash only 6 EACH
Aerial Wreck Out All Strand and Cable 3000 FOOT
F33D-Splice Enclosure Audit (Separate Trip) QUOTE
QCON7-Traffic Control QUOTE
QMISC7-Miscellaneous Small Material Purchases QUOTE
QCON2-Concrete Cut with Restoration QUOTE
QCON7-Traffic Control QUOTE
QMISC3-BID WORK - SMOP-Bid Work QUOTE
.875 INCH. SPLICE CONNECTOR. P3/T10. 3 PIECE Each 30
USE CIFA# 300249 or 300287 PEDESTAL, PLASTIC, 18X36, LDPE, LT GREEN, LOW PROFILE, ACTIVE/NODE, LB1 LOCK Each 5 LUBE PULLING 2.5 GALLON 5
No 6 AWG. GROUND WIRE. BARE. SOLID COPPER Foot 5
.875 INCH P3/T10. JACKETED. FLOODED U/G. COAXIAL TRUNK CABLE Foot 4000 CONDUIT, INNERDUCT , 2" SCH 40, TERRA COTTA W/1100 LB PULL TAPE Foot 14500 MULE TAPE. 2500 LB PULL STRENGTH. 3000 FT PER REEL. WITH FOOTAGE MARKINGSEach 4 VAULT WITH LID, PLASTIC, 17X30X18, HDPE, HEX BOLT Each 12 5/8 INCH X 8 FEET. GROUND ROD. BONDED COPPER. UL LISTED Each 5 288 Count, Low Water Peak, Loose Fibers, Dry Core and Dry Tube, Epoxy Glass or Equiv Strength Member, 600 Pounds TenFoot 10000 WATER BASED GEL. CABLE PULLING LUBRICANT. 1 GALLON. PLASTIC PAIL Each 5 USE 305766 - L.E. STATION. 1GHZ. PN# FML1G7JL04MPR1N. C-COR. 54-1002MHZ FWD. 5-42MHZ REV. GAIN 35DB FWD/18Each 3 Exhibit "A" ATTACHMENT 3
Exhibit "A" ATTACHMENT 3