City of Manteca Development Services Department
Conditions of Approval
Paradise Villas Tentative Subdivision Map
Two-Year Approval Extension
December 19, 2023
Project File Number: SDX 23-101 (originally SDJ 20-118, REZ 20-121, & PD 20-120) Project Name: Two-Year Extension for Paradise Villas Tentative Subdivision Map Project Address: 339 Pestana Avenue, Manteca, CA 95336
APN: 208-210-18
Property Property Owner: Paradise Investment Properties Group, Raghu Malladi, 423 Riley Court, Tracy CA 95337 Project Applicant: Paradise Investment Properties Group, Raghu Malladi, 423 Riley Court, Tracy CA 95337 This list of conditions is not intended to be all-inclusive or a comprehensive list of City regulations. All conditions are referenced to the Paradise Villas Tentative Subdivision Map (dated 08/03/21) on file with the City of Manteca, Development Services Department, Planning Division.
City of Manteca Development Services Department:
The extension for the Tentative Subdivision Map (dated 08/03/21), is approved subject to the following Conditions:
Acceptance of Tentative Subdivision Map. Unless the Subdivider formally objects to these conditions prior to approval of the Tentative Subdivision Map by the City Council, the Subdivider is bound by, to comply with, and to do all things required of or by the Subdivider pursuant to all of the terms, provisions, and conditions of these Conditions of Approval. All costs associated with compliance with the conditions shall be at the owner/developer’s expense.
Expiration of Tentative Subdivision Map Extension. This Tentative Subdivision Map Extension approval shall automatically expire on December 21, 2025 or 24 months from and after the date of issuance. Prior to the expiration date the applicant may apply for an extension not to exceed one year.
Vested Rights. This approval does not vest Subdivider’s rights regarding future development. All ordinances, resolutions, rules, regulations and official policies governing design, improvement and construction standards and specifications applicable to the project and public improvements to be constructed by the Developer shall be those in force and effect at the time the applicable plan or permit approval is granted.
Vesting Fees. This approval does not vest Subdivider’s rights regarding the payment of any development impact fees, exactions and dedications, processing fees, inspection fees, plan checking fees or charges, or any other fee or charge that could have been legally imposed by the City when the original application was deemed complete. All fees and charges shall be paid at the rate in effect at the time such fees are customarily due.
Fees. The developer shall pay all applicable processing fees, permit fees, City development fees, fire fees, school fees, drainage fees, habitat conservation fees and other public entity fees in effect at the time of the issuance of the applicable permit.
Outside Agency Fees. It is the responsibility of the owner/developer to contact all outside agencies and pay applicable fees associated with this project.
Conformance to Plans. This approval is dependent upon and limited to the proposals and plans contained, supporting documents submitted, presentations made to staff, Planning Commission and/or City Council as affirmed to by the applicant. Any variation from these plans, proposals, supporting documents or presentations is subject to review and approval prior to implementation.
Conformance with Subdivision Ordinance. The final map shall comply with all of the requirements for final maps in Chapter 16 of the Manteca Municipal Code and shall show and contain all of the data required by Section 16.09.
Substantial Conformance. Site development plans shall be in substantial conformance to the approved tentative map/site plan and must be submitted, in English units, to the City Engineering Department for review and approval. Maps shall be prepared, wet signed and sealed by a civil engineer, land surveyor, or architect registered in the State of California and licensed to prepare final maps and/or site development plans. The City Engineer will be the approving authority.
Subsequent Development. All activities undertaken in accordance with this approval shall comply with the City’s General Plan and Municipal Code. In cases of conflict between the City’s Municipal Code or map-specific conditions of approval, the governing priority shall be, to the extent legally permitted, as follows: 1) Municipal Code regulations; 2) project-specific conditions; 3) standard conditions. The applicant shall comply with all regulations and code requirements of the Development Services Director, City Engineer, Building Official, Fire Chief, the Police Chief and any other agencies requiring review of the project. If required, these agencies shall be supplied copies of the final maps, site plans, public improvement plans, grading plans and building plans.
Structure Conformance. Applicant shall ensure all future homes and/or structures will be built in compliance with the City’s Zoning Ordinance and Planned Development Standards.
Utility Companies. The applicant is responsible for contacting all appropriate utility companies to obtain agreements for extension and/or relocation of services necessary for the proposed development.
Other Requirements. The applicant shall secure and comply with all applicable federal, state and local licenses, permits, authorizations, conditions, agreements, and orders prior to or during construction and operation, as appropriate.
Failure to Comply. Should the project be found, at any time, not to be in compliance with any of the Conditions of Approval, or should the applicant construct or operate this development in any way other than specified in the Application or Supporting documents or presentations to staff, Planning Commission or City Council, as modified by the Conditions of this Approval, then the terms of this Approval shall be considered to be violated.
Indemnification. The applicant shall indemnify and hold harmless the City, its council members and commissioners, officers, agents, employees, and representatives from liability for any award, damages, costs and fees, including without limitation attorneys’ fees, incurred by the City and/or awarded to any plaintiff in any action related to or arising out of the City’s approval of this project or subdivision Map or any environmental or other documentation related to this project or subdivision Map. The applicant further agrees to provide a defense for the City in any such action.
Limits of Approval. Approval of this application does not constitute approval of any other entitlement or any other necessary permit, license, or approval.
Compliance with Local and State Laws. The subject use shall be conducted in full compliance with all local and state laws. No part of this approval shall be construed to permit a violation of any part of the Manteca Municipal Code. This Tentative Subdivision Map shall be subject to revocation if the subject use is conducted in such a manner as to cause a nuisance.
Erosion Prevention. The applicant shall take all necessary measures to ensure that his activities or those of his agents do not result in measurable erosion of soils on the site, either wind or water, during the construction and operation of the project covered by this approval.
Design Requirements Prior to Building Permit Issuance:
Any roof-mounted equipment shall be fully screened by the roof parapet.
The refuse enclosure shall be finished and painted to match the buildings.
Enhanced paving shall be provided at the project entrance.
Windows on all elevations shall have full trim amenities.
The lighting plan for the project will provide directional shielding for all exterior lighting to minimize the annoyance of direct or indirect glare, particular for the neighboring residential districts to the north and south.
Backflow preventers and ground mounted HVAC equipment shall be screened from view using evergreen plant materials or other materials matching the design of the building.
All conditions of approval for this project shall be written by the project developer on all building permit plan check sets submitted for review and approval. These conditions of approval shall be on, at all times, all grading and construction plans kept on the project site. It is the responsibility of the building developer to ensure that the project contractor is aware of, and abides by, all conditions of approval. Prior approval from the Planning Manager must be received before any changes are constituted in site design, grading, building design, building colors or materials, etc.
The applicant is responsible for contacting all appropriate utility companies to obtain agreements for extension and/or relocation of services necessary for the proposed development.
City of Manteca Engineering Division Conditions
General
This project is a beneficiary of the Pestana Avenue Sewer Area of Benefit. Prior to issuance of the first Building Permit with the Tentative Map, the Developer shall pay the required assessment, per the approved Area of Benefit report.
All improvements shall comply with the City of Manteca Standard Plans and Specifications. Improvement plans shall be submitted to the City Engineer for approval. An encroachment permit is required for all work within the public right-of-way.
The road way and the bio-retention shall be included in a Home Owners Association (HOA).
Developer shall provide easements, requested by the respective utility companies, within the subdivision and shall show said easements on the final subdivision map. Any existing facilities within or adjacent to the project, along Pestana Avenue, that are affected by this project shall be relocated and placed underground at the Developer’s expense.
Developer shall dedicate ten-foot (10’) wide public utility easements on street frontages for underground facilities and appurtenances, as shown on the tentative map, upon approval and recordation of the final map.
Developer shall indicate on the improvement plans topographical information, which shall include one-foot (1’) contour intervals and benchmark data based on City datum.
During all construction phases, Developer shall comply with City Laws regarding dust control. Developer shall also comply with San Joaquin Valley Unified Air Pollution Control District Regulation VIII (Fugitive Dust Prohibitions) in an effort to reduce the amount of fine particulate matter (PM10) entrained into the ambient air from man-made sources.
Prior to the start of construction, all survey monuments that have the possibility of being damaged, destroyed or covered over during the course of construction for this project, shall be located and referenced by a licensed land surveyor and a corner record or record of survey shall be filed with the county surveyor. Survey monuments, which are damaged, destroyed or covered over during the course of construction must be re-set at the original location with a new monument and monument box and another corner record or record of survey shall be filed with the county surveyor. All work in this condition shall be done by a licensed land surveyor.
Prior to approval of a Final Map for any phase of the project the following shall be submitted by the developer and approved by the Engineering Department:
On-site grading and drainage plan,
On-site utility (sanitary sewer, water and storm drain) plan, Off-site improvement plan,
Erosion control plans,
Stormwater Pollution Prevention Plan (SWPPP),
Documentation, as required in the Post-Construction Stormwater Standards Manual, showing compliance with WQO NPDES 2013-0001-DWQ, Joint Trench Intent plans, and
Dedication of required rights-of-way and easements to the City.
The plans specified in (a), (b) and (c) above shall be prepared by a Registered Civil Engineer. The items in (d), (e) and (f) above shall be prepared by a Qualified SWPPP Developer (QSD).
Joint trench utility installation shall be in accordance with Manteca Municipal Code Chapter 13.34 and City Standards.
All residential address numbers shall be plainly visible from the street fronting the property. Said numbers/letters shall contrast with background.
Developer shall enter into an Improvement Agreement for construction of all public improvements which will be dedicated to the City. The agreement will require posting a Performance Bond in the amount of one-hundred percent (100%), posting a Labor-Material Bond in the amount of fifty percent (50%), and payment of all required plan check, testing and inspection fees.
Developer shall enter into an agreement with the City which stipulates the ownership and maintenance responsibility of the development’s infrastructure, as follows. Division of maintenance for the development’s infrastructure shall be noted in the notes section of the Final Map.
The roadway system within the development is private. The development shall be responsible for the maintenance of the roadway network, including street, sidewalk, curbs, gutters and electroliers within the development. Where the City has to open the roadway system to access the water system, the development shall be responsible for repair of the roadway system.
The City shall be granted ownership of and is responsible for maintenance of the water system up to the meters.
The sanitary sewer system and the storm drain system will be maintained by the City only within the City’s right-of-way. The system is the developments responsibility beginning where the systems leave the City right-of-way and enter the private streets.
Developer shall install a benchmark on the North American Vertical Datum of 1988 vertical control system with this project. Final location shall be approved by the City Engineer and shown on the Improvement Plans. Developer shall obtain a benchmark from the City of Manteca and it shall be punched with the elevation, datum reference and benchmark number, which will be assigned by the City. A corner record shall be filed with the San Joaquin County Surveyor’s Office and shall include the language that the benchmark is being added to the City of Manteca Vertical Control Network.
Per City of Manteca Standard Drawing ST-1, prior to issuance of the first building permit, Developer shall install streets within the development in accordance with the “all weather road” standard. In addition to the requirements set forth in City Standard Drawing ST-1, prior to issuance of the first building permit, the Developer shall have installed all street name signs within the development.
Per City of Manteca Resolution No. R2008-150, which approved the City’s Residential Subdivision Partial Acceptance Policy, the Developer is eligible to receive a Partial Acceptance once all health and safety items are complete. Under the Partial Acceptance, Developer is only allowed to pull building permits for a maximum of fifty percent (50%) of the total number of dwellings within a Unit. Final acceptance of a Unit must be obtained to pull any building permits within the final fifty percent (50%). Furthermore, the partial acceptance of public improvements shall permit the occupancy of structures that front upon public streets that are included in the partially accepted public improvements. No Certificate of Occupancy will be issued until the partial acceptance has been approved by the City Council.
Per City of Manteca Resolution No. R2016-235, which approved the City’s Park Acquisition & Improvement Fee Update, the Developer shall pay the applicable adopted park fees.
Improvements which will be dedicated to the City must use a benchmark on the City of Manteca Vertical Control Network to establish the elevations of the improvements. The benchmark used shall be noted on the Improvement Plans.
Site
On-site parking area pavement surface drainage slope shall be as follows: Minimum cross-slope on asphalt concrete is 2% or concrete is 1 % with a maximum of 5%. Concrete valley or curb gutters shall have a minimum slope of 0.25%. The pavement slope in ADA areas shall be 1.5% minimum to 2% maximum.
Provide City Standard Refuse/Recycling Enclosures on-site at the locations shown on the site plan, in accordance with City Standards.
On-site curbing shall conform to City of Manteca Standard ST-35, "Parking Area Curbs”.
Curbing along the sides of lots, where there are no driveways, shall be painted red to restrict parking. Signage along these portions of the project may also be installed instead of the red paint.
Developer shall ensure no buildings are constructed across property lines.
Streets
Cross sections for roadways that are included in the City’s adopted Public Facilities Implementation Plan (PFIP), Transportation Element shall be in accordance with that document. Unless otherwise detailed in these conditions, cross sections for roadways An encroachment permit is required for all work within the public right-of-way.
The adjacent curbing along the residential lots shall be painted red and marked for No Parking, as shown on the Tentative Map.
With the exception of the existing driveways, no driveway shall be closer than twenty-feet (20’) to a curb return. Driveway locations shall be shown on Improvement Plan submittals. Vertical curb shall be installed for 20’ past the curb return and the vertical curb shall be painted red and marked as No Parking.
Existing driveways which are not to be used by this project shall be removed and replaced with sidewalk, vertical curb and gutter.
Developer shall enter into an agreement with the City which stipulates the ownership and maintenance responsibility of the development’s infrastructure, as follows. Division of maintenance for the development’s infrastructure shall be noted in the notes section of the Final Map.
The roadway system within the development is private. The development shall be responsible for the maintenance of the roadway network, including street, sidewalk, curbs, gutters and electroliers within the development. Where the city has to open the roadway system to access the water system, the development shall be responsible for repair of the roadway system.
The City shall be granted ownership of and is responsible for maintenance of the water system up to the meters.
The City shall be granted ownership of and is responsible for maintenance of the sanitary sewer system, up to the cleanouts.
Developer shall dedicate a utility and access easement for the benefit of all lots, over the private street. This dedication shall be made on the Final Map.
Developer shall remove and replace the sidewalk, curb, gutter and accessible ramps, if any, along the frontage of this project if the existing sidewalk is found to be non-ADA-compliant by the City inspector.
Developer shall contact the local post office for direction regarding placement of mail receptacles or any other type of mail delivery proposed.
Developer shall relocate existing mailboxes, per the direction of the City Engineer and the United States Postal Service. Mailboxes shall be constructed in conformance with the standards of the United States Postal Service.
Street lights along the project’s frontage shall maintain an average foot candle coverage of 0.40, with a minimum allowable foot candle at any location of 0.07 within the public right-of-way. Electrolier photometric plan, showing the foot candle coverage, shall be submitted with the Improvement Plans showing this requirement is met with the existing street lights. If not, the project shall install street lights or modify the existing street lights so this requirement is met.
The electrolier locations shall be finalized during the Improvement Plan review process. Electroliers shall maintain an average foot candle coverage of 0.40 throughout the project, with a minimum allowable foot candle at any location of 0.07. Electrolier photometric plan, showing the foot candle coverage, shall be submitted with the Improvement Plans.
If Developer installs electrolier poles other than the City’s standard cobra head fixture on a galvanized pole, the Developer shall supply the City with one extra complete light fixture and pole, per phase/unit of the project. If applicable, this will be a condition of final acceptance of the subdivision.
The thickness of all sidewalks installed with the project shall be six inches (6”).
The existing curb and gutter along the street frontages of this project will be inspected prior to the final inspection of the site work building permit, once construction traffic is limited to project’s proposed driveway. The Developer shall remove and replace damaged or dilapidated sections of the curb and gutter, as instructed by the City.
Accessibility ramps installed or modified with this project shall be in compliance with the latest revision of the California Building Code, Chapter 11B.
Fencing and Walls
Developer shall construct a minimum six foot (6’) high wood fence along the boundaries of this subdivision which abut undeveloped land.
Water
Improvements shall be constructed in conformance with the latest version of the City Water Master Plan.
The update of the City’s Water Master Plan, Reclaimed Water Master Plan and Groundwater Sustainability Plan, including the evaluation of a Direct/Indirect Potable Reuse Facility are currently underway. This project will be required to participate in expansion of the infrastructure or facilities identified in the updated Master Plans and any correlating funding programs.
A minimum ten-foot (10’) separation, from outside of pipe to outside of pipe, shall be maintained between water mains and parallel sanitary sewer, storm drain, and irrigation lines.
Existing wells within the boundary of the proposed development which are not approved for use by the City, shall be abandoned in accordance with San Joaquin County Public Health Services requirements.
Fire hydrant locations shall be as approved by the Fire Department and finalized during the Improvement Plan review process. Developer shall provide and install fire hydrant “blue dot” reflective markers prior to issuance of the first building permit.
Existing service connections to the City’s water mains which will not be used by this project shall be abandoned, as directed by the City of Manteca.
Irrigation Supply
A separate landscape irrigation meter shall be installed at the back of the sidewalk adjacent to a dedicated public street right-of-way for the use of irrigation in Parcel B.
Landscape irrigation water system shall be designed to operate from a single point of connection.
Irrigation water from potable system shall be delivered via a single meter which is no larger than 2”.
Piping which is installed from the potable water system for the purposes of irrigation shall be purple pipe. This includes the valve boxes.
Storm Drainage
Improvements shall be constructed in conformance with the latest edition of the Storm Drain Master Plan, the City’s Post-Construction Manual and City Standards.
A preliminary storm drainage plan shall be submitted to the City Engineer for approval concurrently with the first improvement plan submittal. The plan shall be accompanied by calculations for peak flows, total runoff, pipe sizes, detention basin volume and evidence of groundwater depth.
This project shall submit calculations, per Chapter 3, Section 3.1 of the City’s Storm Drain Master Plan, showing attenuation of the storm drain flows for this project is not required.
All drain inlets shall be marked "No Dumping - Drains to River". Drain markers shall be purchased from the City of Manteca at cost plus 15% administrative charge, and installed by the Developer prior to acceptance of the improvements.
Developer shall incorporate appropriate site design measure(s) and submit the results of the Post- Construction Runoff Standards Manual. The City of Manteca approval of the proposed measures is precedent to issuance of any building, grading or construction permits.
Developer shall develop and submit a Project Stormwater Plan that identifies the methods to be employed to reduce or eliminate stormwater pollutant discharges through the construction, operation and maintenance of source control measures, low impact development design, site design measures, stormwater treatment control measures, and hydromodification control measures. Design and sizing requirements shall comply with the 2015 Post- Construction Stormwater Standards Manual. City of Manteca approval of the Project Stormwater Plan is precedent to issuance of any building, grading, or construction permits. Two paper copies and an electronic copy of the Project Stormwater Plan shall be provided to the City of Manteca Developer shall develop a hydromodification management plan to ensure the post-project stormwater runoff flow rate shall not exceed estimated pre-project flow rate for the 2-year, 24-hour storm. The hydromodification management plan shall be incorporated into the Project Stormwater Plan.
Developer shall develop and submit an Operations and Maintenance Plan that identifies the operations, maintenance, and inspection requirements of all stormwater treatment and baseline hydromodification control measures identified in the approved Project Stormwater Plan. City of Manteca approval of the preliminary Operations and Maintenance Plan is precedent to issuance of any building, grading, or construction permits. Two paper copies and an electronic copy of the Maintenance Plan shall be provided to the City of Manteca.
City of Manteca approval of the final Operations and Maintenance Plan and recordation of the Maintenance Access Agreement is precedent to first building final inspection for this project. Two paper copies and an electronic copy of the final Operations and Maintenance Plan shall be provided to the City of Manteca.
Post-Construction Management Practices shall conform to the City’s adopted Multi-Agency Post Construction Stormwater Standards Manual.
Where conflict between standards arises, the standard most-protective to water quality, to public health and safety, and against flooding shall be utilized.
Prior to any land disturbing construction activities occurring on a project, Developer shall meet the requirements of NPDES. For sites exceeding 1 acre of disturbance area that are deemed non- exempt, contractor shall prepare and submit a Storm Water Pollution Prevention Plan (SWPPP) and apply for a permit under the California General Construction NPDES permit. SWPPP shall be prepared and signed by a Qualified SWPPP Developer (QSD) certified by the State Water Resources Control Board. All modifications to SWPPP shall be implemented by a QSD in responsible charge for the project. The SWPPP shall be implemented under the supervision of a Qualified SWPPP Practitioner (QSP). For permit information, contact the State Water Resources Control Board (SWRCB) at:
State Water Resources Control Board PO Box 1977, Sacramento, CA 95812-1977 Attn: Storm Water Permitting Section Telephone: (916) 341-5537 To log in to the SWRCB Storm Water Multiple Application and Report Tracking System (SMARTS) to enter site information and apply for permit, please contact the City of Manteca Engineering Department to establish a project and authorize data entry access.
All other sites shall conform to the City of Manteca Standards, the California Green Building Standards, and Section E.10 of the NPDES permit 2013-0001-DWQ. All construction involving land disturbing activities shall submit for approval an Erosion Control and Sedimentation Plan (ESCP) prepared and signed by a QSD. All ESCP treatment measures and BMPs must be maintained at all times until construction is completed and the site is stabilized as defined under the Construction General NPDES permit.
Prior to issuance of the first grading or building permit for a project, a copy of the SWPPP or ESCP shall be submitted by the developer and approved by Authorized Signatory or Legally Responsible Person (LRP) for the City’s NPDES program. Contact the City of Manteca Engineering Department to identify appropriate person for review and approval of plans and documents.
It is recognized that the design and calculations which have been submitted thus far to demonstrate this project’s compliance with the City’s Post-Construction Stormwater Standards Manual is approved for project entitlements but may require further refinement for final approval, which is precedent to issuance of any building, grading, or construction permits.
Bioretention areas which are adjacent to the City sidewalk shall include a one-foot (1’) wide flat area behind the sidewalk prior to the start of the bioretention area side slope.
Sanitary Sewer
Improvements shall be constructed in conformance with the latest version of the City Wastewater Collection System Master Plan and City Standards.
The update of the City’s Wastewater Master Plan is currently underway. This project will be required to participate in expansion of the infrastructure or facilities, including at the City’s Water Quality Control Facility, identified in the updated Master Plan and any correlating funding programs.
Any existing septic tank(s) on the property that will not be approved by the City shall be abandoned in accordance with the permitting requirements of the San Joaquin County Environmental Health Department prior to issuance of the first building permit.
A preliminary sewer plan shall be submitted to the City Engineer for approval concurrently with the first improvement plan submittal. The plan shall be accompanied by calculations for peak wet weather flows showing pipe sizes and slopes for the entire development.
Homeowners’ Association
A Homeowners’ Association (HOA) or other funding mechanism shall be formed at the developer’s expense to provide for the maintenance and operation of the landscaping, landscape irrigation, park improvements, sound walls, public park/basin, public open spaces, internal street lights, all public streetscape/median landscape improvements, HOA-maintained utilities and bike paths located within the boundaries of the community. HOA bylaws must be submitted to the City for approval prior to issuance of the first building permit. No bylaws which are not approved by the City may be entered into.
The HOA bylaws shall include language to address the dissolution of the HOA. This language should include that dissolution of the HOA is only permitted if the City agrees to take over maintenance of all HOA maintained infrastructure. The City may agree to take over all or a portion of the HOA maintained infrastructure and may condition its agreement with items such as timing for the maintenance switch, the infrastructure condition at the time of the switch etc. This portion of the bylaws must also include language that changes to infrastructure maintenance related bylaws must be approved by the City prior the changes being approved by the HOA members.
City of Manteca Fire Department Conditions
An additional water main is required to come from the north or west to have a looped system.
Fire lane along one side of Street A is required. Fire lane must be painted red and stenciled in white letters, “Fire Lane No Parking” every 25 feet.
City of Manteca Information Technology Department Conditions Developer will need to use apartment style addressing for the complex off of Pestana Avenue. As an example, addresses for each townhome would be 339 Pestana Ave., Unit 2 or 339 Pestana Ave., Unit 23. Please send the address exhibit for the complex as soon as it is available in order to confirm if it meets City criteria. The City can also do the addressing for the complex, at the developer’s request.
The proposed names for the private streets shall be sent to the IT Department as soon as they are available for review.
The CAD file for the project will need to be submitted to the IT Department once available.
City of Manteca Parks Department Conditions
Parcel owner shall comply with current Park policies and pay the Park Acquisition and Improvement fees.
Trees shall be planted outside of the Right of Way.
City of Manteca Solid Waste Department Conditions
The homes along Street B shall place their garbage carts out on Street A. The residential truck will pick up the garbage carts along Street A, do a 3-point turn and exit out Street A while picking up the remaining garbage carts along the way. The enclosure on site is used for recycling for the residents and will need to have bins for the commercial truck to dump. Any landscaping will have to be taken offsite to a composting facility either by a landscaper or by maintenance.
City of Manteca Transit Department Conditions
A bus turnout will be required at the location of the existing bus stop along the project’s frontage on Pestana Avenue.
San Joaquin Valley Air Pollution Control District
This project shall comply with all applicable requirements from the San Joaquin Valley Air Pollution Control District.
San Joaquin County Environmental Health Department
This project shall comply with all applicable requirements from the San Joaquin County Environmental Health Department.
Manteca Unified School District
School Fees. Developer shall contact Manteca Unified School District Facilities Planning regarding school fees and requirements and shall provide proof of payment or waiver of such fees to the Development Services Department.
San Joaquin County Multi-Species Habitat Conservation & Open Space Plan (SJMSCP) This Project is subject to the SJMSCP and is required to comply with the SJMSCP permitting process.
Conditions of Approval: Paradise Villas Extension – SDX 23-101 Conditions of Approval: Paradise Villas Extension – SDX 23-101 Exhibit “B”Exhibit “B”ATTACHMENT 3ATTACHMENT 3Two-Year Extension for Paradise Villas SDX 23—101339 Pestana Ave..Two-Year Extension for Paradise Villas SDX 23—101339 Pestana Ave..
Exhibit “B”
Exhibit “B”
ATTACHMENT 3
ATTACHMENT 3
Two-Year Extension for Paradise Villas
SDX 23—101
339 Pestana Ave..
Two-Year Extension for Paradise Villas
SDX 23—101
339 Pestana Ave..