$1,513,422
ITEM
NO. ITEM DESCRIPTION BID QTY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1 Mobilization 1 LS $ 160,000.00 $ 160,000.00 $ 164,500.50 $ 164,500.50 $ 193,000.00 $ 193,000.00 $ 120,000.00 $ 120,000.00 $ 607,619.00 $ 607,619.00 2 Progress Schedule (Critical Path Method) 1 LS $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 1,100.00 $ 1,100.00 $ 2,500.00 $ 2,500.00 $ 8,700.00 $ 8,700.00 3 Monument Preservation 1 LS $ 11,880.00 $ 11,880.00 $ 10,800.00 $ 10,800.00 $ 13,000.00 $ 13,000.00 $ 14,000.00 $ 14,000.00 $ 11,085.00 $ 11,085.00 4 Training of City Staff 1 LS $ 3,409.00 $ 3,409.00 $ 3,100.00 $ 3,100.00 $ 3,300.00 $ 3,300.00 $ 3,600.00 $ 3,600.00 $ 5,132.00 $ 5,132.00 5 Final O&M Manuals 1 LS $ 1,650.00 $ 1,650.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,800.00 $ 1,800.00 $ 2,566.00 $ 2,566.00 6 Record Drawings 1 LS $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 2,500.00 $ 2,500.00 $ 7,500.00 $ 7,500.00 7 Resident and Business Notification 1 EA $ 2,000.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 $ 5,600.00 $ 5,600.00 $ 5,000.00 $ 5,000.00 $ 15,533.00 $ 15,533.00 8 Federal Trainee (Portland Cement Concrete) 2 EA $ 200.00 $ 400.00 $ 500.00 $ 1,000.00 $ 1,160.00 $ 2,320.00 $ 1,000.00 $ 2,000.00 $ 513.00 $ 1,026.00 9 Federal Trainee (Electrical) 1 LS $ 1.00 $ 1.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 5,132.00 $ 5,132.00 10 Lead Compliance Plan and Health and Safety Plan 1 LS $ 6,500.00 $ 6,500.00 $ 2,500.00 $ 2,500.00 $ 2,800.00 $ 2,800.00 $ 6,000.00 $ 6,000.00 $ 2,566.00 $ 2,566.00 11 Water Pollution Control 1 LS $ 19,000.00 $ 19,000.00 $ 14,350.00 $ 14,350.00 $ 25,100.00 $ 25,100.00 $ 49,000.00 $ 49,000.00 $ 6,507.00 $ 6,507.00 12 Traffic Control System 1 LS $ 141,500.00 $ 141,500.00 $ 150,000.00 $ 150,000.00 $ 214,000.00 $ 214,000.00 $ 203,000.00 $ 203,000.00 $ 473,473.00 $ 473,473.00 13 Construction Surveys 1 LS $ 24,833.00 $ 24,833.00 $ 22,000.00 $ 22,000.00 $ 27,500.00 $ 27,500.00 $ 25,000.00 $ 25,000.00 $ 22,575.00 $ 22,575.00 14 Construction Area Signs 1 LS $ 15,000.00 $ 15,000.00 $ 10,500.00 $ 10,500.00 $ 15,700.00 $ 15,700.00 $ 37,000.00 $ 37,000.00 $ 12,000.00 $ 12,000.00 15 Remove Thermoplastic Traffic Stripe 17,200 LF $ 0.45 $ 7,740.00 $ 0.45 $ 7,740.00 $ 0.50 $ 8,600.00 $ 0.50 $ 8,600.00 $ 0.45 $ 7,740.00 16 Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste) 2,050 SF $ 1.80 $ 3,690.00 $ 1.80 $ 3,690.00 $ 2.00 $ 4,100.00 $ 2.00 $ 4,100.00 $ 1.80 $ 3,690.00 17 Remove Pavement Markings 2,520 SF $ 5.00 $ 12,600.00 $ 5.00 $ 12,600.00 $ 5.60 $ 14,112.00 $ 5.55 $ 13,986.00 $ 5.00 $ 12,600.00 18 Cold Plane Asphalt Concrete Pavement (0.2' Depth) 1,730 SY $ 20.70 $ 35,811.00 $ 34.00 $ 58,820.00 $ 10.50 $ 18,165.00 $ 21.60 $ 37,368.00 $ 16.00 $ 27,680.00 19 Roadway Excavation 1,035 CY $ 102.00 $ 105,570.00 $ 265.00 $ 274,275.00 $ 87.00 $ 90,045.00 $ 274.00 $ 283,590.00 $ 130.00 $ 134,550.00 20 Remove Minor Concrete (Curb & Gutter) 720 LF $ 18.00 $ 12,960.00 $ 14.00 $ 10,080.00 $ 120.00 $ 86,400.00 $ 34.00 $ 24,480.00 $ 36.25 $ 26,100.00 21 Remove Minor Concrete (Sidewalk) 4,140 SF $ 7.25 $ 30,015.00 $ 5.00 $ 20,700.00 $ 8.80 $ 36,432.00 $ 4.75 $ 19,665.00 $ 5.00 $ 20,700.00 22 Place HMA (Type A) 1,660 TON $ 167.35 $ 277,801.00 $ 220.00 $ 365,200.00 $ 247.00 $ 410,020.00 $ 208.00 $ 345,280.00 $ 132.00 $ 219,120.00 23 Tack Coat 0.4 TON $ 3,750.00 $ 1,500.00 $ 500.00 $ 200.00 $ 10,300.00 $ 4,120.00 $ 1,100.00 $ 440.00 $ 800.00 $ 320.00 24 Install Minor Concrete (Sidewalk) 2,560 SF $ 12.00 $ 30,720.00 $ 16.00 $ 40,960.00 $ 21.30 $ 54,528.00 $ 9.20 $ 23,552.00 $ 13.00 $ 33,280.00 25 Install Minor Concrete (Curb Ramps) 43 CY $ 2,790.00 $ 119,970.00 $ 1,150.00 $ 49,450.00 $ 750.00 $ 32,250.00 $ 1,385.00 $ 59,555.00 $ 1,390.00 $ 59,770.00 26 Install Minor Concrete (Stamped Concrete) 13,765 SF $ 14.00 $ 192,710.00 $ 12.00 $ 165,180.00 $ 8.10 $ 111,496.50 $ 8.10 $ 111,496.50 $ 8.00 $ 110,120.00 27 Install Minor Concrete (Curb & Gutter Per City of Manteca Std Dwg ST-7) 670 LF $ 60.00 $ 40,200.00 $ 67.00 $ 44,890.00 $ 66.50 $ 44,555.00 $ 52.00 $ 34,840.00 $ 30.50 $ 20,435.00 28 Install Minor Concrete Vertical Curb (Type A1-6) 7,065 LF $ 26.00 $ 183,690.00 $ 33.00 $ 233,145.00 $ 32.50 $ 229,612.50 $ 52.00 $ 367,380.00 $ 27.00 $ 190,755.00 29 Place Aggregate Base (Class 2) 495 CY $ 193.00 $ 95,535.00 $ 375.00 $ 185,625.00 $ 220.00 $ 108,900.00 $ 146.00 $ 72,270.00 $ 187.00 $ 92,565.00 30 Install Median Fence 2,255 LF $ 132.55 $ 298,900.25 $ 120.50 $ 271,727.50 $ 130.00 $ 293,150.00 $ 120.00 $ 270,600.00 $ 121.00 $ 272,855.00 31 Slurry Seal (Type II) 355 TON $ 378.00 $ 134,190.00 $ 314.00 $ 111,470.00 $ 350.00 $ 124,250.00 $ 388.00 $ 137,740.00 $ 314.00 $ 111,470.00 32 Install Truncated Domes (Detectable Warning Surface) 310 SF $ 25.00 $ 7,750.00 $ 40.00 $ 12,400.00 $ 27.00 $ 8,370.00 $ 47.00 $ 14,570.00 $ 65.00 $ 20,150.00 33 Object Marker (Type N) 11 EA $ 550.00 $ 6,050.00 $ 550.00 $ 6,050.00 $ 620.00 $ 6,820.00 $ 611.00 $ 6,721.00 $ 45.00 $ 495.00 34 Object Marker (Type K-2) 10 EA $ 550.00 $ 5,500.00 $ 550.00 $ 5,500.00 $ 620.00 $ 6,200.00 $ 611.00 $ 6,110.00 $ 45.00 $ 450.00 35 Remove Object Marker 1 EA $ 25.00 $ 25.00 $ 50.00 $ 50.00 $ 56.00 $ 56.00 $ 111.00 $ 111.00 $ 45.00 $ 45.00 36 Furnish Single Sheet Aluminum Sign (0.080"-unframed) 570 SF $ 28.00 $ 15,960.00 $ 28.00 $ 15,960.00 $ 31.00 $ 17,670.00 $ 31.00 $ 17,670.00 $ 13.50 $ 7,695.00 37 Remove Roadside Sign 1 EA $ 50.00 $ 50.00 $ 100.00 $ 100.00 $ 56.00 $ 56.00 $ 220.00 $ 220.00 $ 65.00 $ 65.00 38 Remove Roadside Sign (Strap and Saddle Bracket Method) 1 EA $ 50.00 $ 50.00 $ 50.00 $ 50.00 $ 56.00 $ 56.00 $ 220.00 $ 220.00 $ 65.00 $ 65.00 39 Remove Roadside Sign-One Post 2 EA $ 50.00 $ 100.00 $ 150.00 $ 300.00 $ 56.00 $ 112.00 $ 330.00 $ 660.00 $ 65.00 $ 130.00 40 Relocate Roadside Sign 1 EA $ 425.00 $ 425.00 $ 425.00 $ 425.00 $ 450.00 $ 450.00 $ 475.00 $ 475.00 $ 422.00 $ 422.00 41 Relocate Roadside Sign-One Post 1 EA $ 425.00 $ 425.00 $ 425.00 $ 425.00 $ 450.00 $ 450.00 $ 475.00 $ 475.00 $ 422.00 $ 422.00 42 Install Roadside Signs (One Post) 101 EA $ 425.00 $ 42,925.00 $ 425.00 $ 42,925.00 $ 450.00 $ 45,450.00 $ 475.00 $ 47,975.00 $ 422.00 $ 42,622.00 43 Install Roadside Signs (Strap and Saddle Bracket Method) 9 EA $ 150.00 $ 1,350.00 $ 150.00 $ 1,350.00 $ 169.00 $ 1,521.00 $ 165.00 $ 1,485.00 $ 422.00 $ 3,798.00 44 Place Thermoplastic Traffic Stripes 35,200 LF $ 1.15 $ 40,480.00 $ 1.15 $ 40,480.00 $ 1.30 $ 45,760.00 $ 1.30 $ 45,760.00 $ 1.18 $ 41,536.00 45 Place Thermoplastic Pavement Marking 10,100 SF $ 8.00 $ 80,800.00 $ 8.00 $ 80,800.00 $ 9.00 $ 90,900.00 $ 8.90 $ 89,890.00 $ 8.00 $ 80,800.00 46 Place Green Thermoplastic Pavement Marking 10,200 SF $ 12.00 $ 122,400.00 $ 12.00 $ 122,400.00 $ 13.50 $ 137,700.00 $ 13.33 $ 135,966.00 $ 12.00 $ 122,400.00 47 Place Curb Paint (Yellow)(2 COATS) 80 LF $ 6.00 $ 480.00 $ 6.00 $ 480.00 $ 6.50 $ 520.00 $ 6.70 $ 536.00 $ 6.00 $ 480.00 48 Place Curb Paint (Red) 50 LF $ 6.00 $ 300.00 $ 6.00 $ 300.00 $ 6.50 $ 325.00 $ 6.70 $ 335.00 $ 6.00 $ 300.00 49 Adjust Water Valve Cover to Grade (Participating) (City of Manteca) 3 EA $ 1,500.00 $ 4,500.00 $ 1,500.00 $ 4,500.00 $ 3,300.00 $ 9,900.00 $ 800.00 $ 2,400.00 $ 1,500.00 $ 4,500.00 50 Adjust Sanitary Sewer Manhole Cover to
Grade (Participating) (City of Manteca) 1 EA $ 2,000.00 $ 2,000.00 $ 2,200.00 $ 2,200.00 $ 3,300.00 $ 3,300.00 $ 900.00 $ 900.00 $ 1,750.00 $ 1,750.00 51 Adjust Drainage Inlet Cover to Grade 3 EA $ 2,000.00 $ 6,000.00 $ 950.00 $ 2,850.00 $ 3,300.00 $ 9,900.00 $ 1,400.00 $ 4,200.00 $ 2,500.00 $ 7,500.00 52 Modifying Signal and Lighting (North Main St/Alameda St) 1 LS $ 105,269.00 $ 105,269.00 $ 95,700.00 $ 95,700.00 $ 108,000.00 $ 108,000.00 $ 106,500.00 $ 106,500.00 $ 82,685.00 $ 82,685.00 53 Modifying Signal and Lighting (North Main St/Louise Ave) 1 LS $ 116,144.00 $ 116,144.00 $ 105,585.00 $ 105,585.00 $ 119,000.00 $ 119,000.00 $ 117,500.00 $ 117,500.00 $ 85,535.00 $ 85,535.00 54 Modifying Signal and Lighting (North Main St/Lancaster Dr) 1 LS $ 104,286.00 $ 104,286.00 $ 94,805.00 $ 94,805.00 $ 107,000.00 $ 107,000.00 $ 105,500.00 $ 105,500.00 $ 77,005.00 $ 77,005.00 55 Modifying Signal and Lighting (North Main St/Northgate Dr) 1 LS $ 44,345.00 $ 44,345.00 $ 40,314.00 $ 40,314.00 $ 45,000.00 $ 45,000.00 $ 44,800.00 $ 44,800.00 $ 50,375.00 $ 50,375.00 56 Pedestrian Hybrid Beacon System (North Main St/Edison St) 1 LS $ 314,860.00 $ 314,860.00 $ 286,236.00 $ 286,236.00 $ 323,000.00 $ 323,000.00 $ 318,000.00 $ 318,000.00 $ 301,367.00 $ 301,367.00 TOTAL $ 2,995,249.25 TOTAL $ 3,206,688.00 TOTAL $ 3,264,172.00 TOTAL $ 3,356,321.50 TOTAL $ 3,457,756.00
KNIFE RIVER CONSTRUCTION
STOCKTON, CA
MARTIN GENERAL ENGINEERING, INC.
RANCHO CORDOVA, CA
MOUNTAIN CASCADE, INC.
LIVERMORE, CA
UNITED PAVEMENT MAINTENANCE
HUGHSON, CA
GEORGE REED, INC.
MODESTO, CA
TOTAL ITEMS 1 - 56:
Main Street (Northgate Dr - Alameda St) Bike & Pedestrian Improvement Project CIP No. 20005 Engineers Estimate
October 10, 2024
ATTACHMENT 2