Cities Index.
Attachment 2 – Projects Location

Manteca City Council
June 3, 2025

Document
Attachment 2 – Projects Location
Meeting
June 3, 2025
Body
Manteca City Council
Original file
16.4 MB
Text extracted from the city's file for reading and search. Open the original on manteca-ca.legistar1.com. That file is the official record.

CIP (25002) ROAD SAFETY BARRIER WALL PROJECT

PROJECT AND DESCRIPTION
ATTACHMENT 2
Source: City of Manteca GIS Viewer
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA
This project will replace the protective road safety barrier wall along sections of Union Road and Louise Avenue for improved traffic safety .

Project construction estimated schedule start is July 2025 and end June 2026.

The estimated useful life of the project is approximately 30 years.

CIP (11034) SR 120/MCKINLEY AVE INTERCHANGE PROJECT

PROJECT AND DESCRIPTION
ATTACHMENT 2
3,611.1
9 Source: City of Manteca GIS Viewer
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA
CIP (17063) MAIN STREET: YOSEMITE AVE TO

ALAMEDA ST IMPROVEMENT PROJECT

PROJECT DESCRIPTION
Project Boundary
NORTH
ATTACHMENT 2
CIP (17058) TRAFFIC SIGNAL UPDATE PROJECT

PROJECT AND DESCRIPTION
ATTACHMENT 2
Source: City of Manteca GIS Viewer
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA
The City will update the signalized intersections to improve traffic and pedestrian safety with the new modern equipment at the intersections. The proposed improvements include upgrading existing traffic signal controllers, upgrading existing traffic signal cabinets, installing wireless integrated systems, installing battery backup systems, installing fiber optic cable systems, upgrading traffic signal heads at certain locations, installing Hub cabinets assemblies, and installing City’s central traffic management systems.

Project construction estimated schedule start is August 2025 and end June 2026.

The estimated useful life of the project is approximately 20 years.

CIP (20005) MAIN ST (NORTHGATE DR TO ALAMEDA ST)

BIKE & PEDESTRIAN IMPROVEMENTS PROJECT

PROJECT AND DESCRIPTION
ATTACHMENT 2
Source: City of Manteca GIS Viewer
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA
Install Class II bike lanes, raised medians, pedestrian median fencing, curb ramps, enhanced pedestrian crossings, modify traffic signal detector loops along Main St. Install pedestrian hybric beacon (HAWK) signal at Main St & Edison St intersection.

Project construction estimated schedule start is August 2025 and end June 2026.

The estimated useful life of the project is approximately 20 years.

CIP (New) Wawona Street Pavement Maintenance Project
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA
Source: City of Manteca GIS Viewer
ATTACHMENT 2
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA

PROJECT AND DESCRIPTION
This project will reconstruct, and/or rehabilitate pavement of a portion of Wawona Street. The project may include full reconstruction of the roadway section, grind and AC overlay, digouts, repair curb, gutter, crack seal, cape seal and sidewalks, new street striping, and ADA curb ramps improvements. Wawona Street is classified an arterial road that receives heavy truck traffic.

Project construction estimated schedule start is July 2025 and end December 2025.

The estimated useful life of the project is 20 years.

CIP (New) Shasta Park Area Pavement Maintenance Project LEGEND

CITY LIMITS

OTHER CITIES

MANTECA
Source: City of Manteca GIS Viewer
ATTACHMENT 2
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA
LEGEND

MANTECA
LEGEND

MANTECA

PROJECT AND DESCRIPTION
This project will reconstruct, and/or rehabilitate pavement within the project area identified by the red boundary shown on the project map. The project may include full reconstruction of the roadway section, grind and AC overlay, digouts, repair curb, gutter, crack seal, cape seal and sidewalks, new street striping, and ADA curb ramps improvements. The Project Streets are classified an arterial road that receives heavy truck traffic.

Project construction estimated schedule start is July 2025 and end December 2025.

The estimated useful life of the project is 20 years.

CIP (New) 2025 Pavement Maintenance Project
Source: City of Manteca GIS Viewer
ATTACHMENT 2
LEGEND

CITY LIMITS

OTHER CITIES

MANTECA

PROJECT AND DESCRIPTION
This project will reconstruct, and/or cape seal majority of roads within the identified project locations. The project may include full reconstruction of the roadway section, crack seal, cape seal, repair curb, gutter and sidewalks, new street striping, and ADA curb ramps improvements. The streets in the project are classified as Collector and Residential roads and do not typically receive heavy truck traffic. Arterial roads are primarily excluded from this project.

Project construction estimated schedule start is July 2025 and end December 2025.

The estimated useful life of the project is 10 to 40 years.

← All documents from this meeting