AGENDA
THURSDAY OCTOBER 6, 2022 5:00 P.M. Closed Session
6:30 P.M. Open Session
REGULAR MEETING
CITY COUNCIL, AIRPORT COMMISSION,
MARINA ABRAMS B NON-PROFIT CORPORATION, PRESTON PARK SUSTAINABLE
COMMUNITY NON-PROFIT CORPORATION, SUCCESSOR AGENCY OF THE FORMER
MARINA REDEVELOPMENT AGENCY AND MARINA GROUNDWATER
SUSTAINABILITY AGENCY
Council Chambers
211 Hillcrest Avenue
Marina, California
Zoom Meeting URL: https://zoom.us/j/730251556
Zoom Meeting Telephone Only Participation: 1-669-900-9128 - Webinar ID: 730 251 556
In accordance with California Government Code §54953(e)(1)(A) and (C) and the Proclamation of a State of Emergency issued by Governor Newsom on March 4, 2020, under the provisions of Go vernment Code §8625 related to the COVID -19 (coronavirus) pandemic, consistent with recommendations by State and local health officials regarding social distancing and in order to prevent an imminent risk to the health and safety of attendees as determine d in Resolution 2022-110, public participation in City of Marina City Council public meetings shall be electronic only and without a physical location for public participation until the earlier of May 31, 2022, or such time as the City Council may ado pt a resolution in accordance with Government Code §54953(e)(3). This meeting is being broadcast “live” on Access Media Productions (AMP) Community Television Cable 25 and on t he City of Marina Channel and on the i nternet at https://accessmediaproductions.org/
PARTICIPATION
You may participate in the City Council meeting in real-time by calling Zoom Meeting via the weblink and phone number provided at the top of th is agenda. Instructions on how to acce ss, vie w a nd participate in remote meetings are provided by visiting the City’s home page at https://cityofmarina.org/. Attendees can make oral comments during the meeting by using the “Raise Your Hand” feature in the webinar or by pressing *9 on your telephone keypad if joining by phone only. If you are unable to participate in real-time, you may email to [email protected] with the subject line “Public Comment Item#__ ” (insert the item number relevant to your comment) or “Public Comment – Non Agenda Item.” Comments will be reviewed and distr ibuted before the meeting if received by 5:00 p.m. on the day of the meeting. All comments received will become part of t he record. Council will have the option to modify their action on items based on comments received.
AGENDA MATERIALS
Agenda materi als, staff reports and background information related to regular agenda items are available on the City of Marina’s websit e www.cityofmarina.org. Materials r elated to an item on this agenda submitted to the Coun cil after distribution of the agenda packet will be made available on the City of M arina website www.cityofmarina.org subject to City staff’s ability to post the documents before the meeting
Agenda for City Council Meeting of Thursday, October 6, 2022 Page 2
VISION STATEMENT
Marina will grow and mature from a small tow n bedroom community to a small city which i s diversified, vibrant and through positive relationships with regional agencies, self-sufficient. The City will develop in a way that insulates it from the negative impacts of urban sprawl to become a desirable residential and business community in a natural setting. (Resolution No. 2006-112 - May 2, 2006)
MISSION STATEMENT
The City Council will provide the leadership in protecting Marina’s natural setting while developing the City in a way that provides a bala nce of housing, jobs and business opportuni ties that will result in a community c haracterized by a desirable quality of life, including recreation and cultural opportunities, a safe environment and an economic viability that supports a high level of munici pal services and infrastructure. (Resolution No. 2006-112 - May 2, 2006)
1. CALL TO ORDER
2. ROLL CALL & ESTABLISHMENT OF QUORUM: (City Council, Airport Commissioners, Marina Abrams B Non -Profit Corporation, Preston Park Sustainable Communities Nonpr ofit Corporation, Successor Agency of the Former Redevelopment Agency Members and Ma rina Groundwater Sustainability Agency)
Cristina Medina Dirksen, David Burnett, Lisa Berkley, Mayor Pro -Tem/Vice Chair Kathy Biala, Mayor/Chair Bruce C. Delgado
3. CLOSED SESS ION: As permitted by Government Code Sect ion 54956 et seq., the (City Council, A irport C ommissioners, Marina Abrams B Non -Profit Corporation, Preston Park Sustainable Communities Nonpr ofit Corporation, Successor Agency of the Former Redevelopment Agency M embers and Ma rina Groundwater Sustainabili ty Agency) may adjourn to a C losed or E xecutive Session to consider specific matters dealing with litigation, certain personnel matters, property negotiations or to confer with the City’s Meyers -Milias- Brown Act representative.
a. Conference with Legal Counsel, Anticipated Litigation, Significant exposure to litigation pursuant to § 54956.9(b): 1 case
b. Conference with Legal Counsel – Existing Litigation pursuant to paragraph (10 of Subdivision (d) of Govt. Code Section 54956.9: Marina Aviation, LLC Phil Lewis V. FAA et al. Petition for Review, United States Court of Appeals for the 9th Circuit, Case No. 22-70173
c. Conference with Labor Negotiators §54957.6
i. Marina Employee Association
City Negotiators: Layne P. Long, City Manager and Employee Relations Officer c. Real Property Negotiation
i. Property: Commercial property at southeast corner of Del Monte Blvd. and Palm Avenue (APN 032-303-038) and residential property at Hayes Circle and 3rd Avenue (APN 032-303-039, a portion)
Negotiating Party: George Powell
Negotiator(s): City Manager
Terms: Price and Terms
ii. Property: City of Marina Corporation Yard, 2660 5th Avenue, Marina, CA Negotiating Party: California State University Monterey Bay Negotiator(s): City Manager
Terms: Price and Terms
Agenda for City Council Meeting of Thursday, October 6, 2022 Page 3
iii. Property: 761 Neeson Road, Building 524, APN: 031-111-0206-000 Negotiating Dish Wireless, LLC
Negotiator(s): City Manager
Terms: Price and Terms
6:30 PM - RECONVENE OPEN SESSION AND REPORT ON ANY ACTIONS TAKEN I N
CLOSED SESSION
4. MOMENT OF SILENCE & PLEDGE OF ALLEGIANCE (Please stand)
5. SPECIAL PRESENTATIONS:
a. Monterey-Salinas Transit Van Pool Presentation
b. Red Ribbon Week Proclamation
c. Breast Cancer Awareness Month Proclamation
6. SPECIAL ANNOUNCEMENTS AND COMMUNICATIONS FROM THE FLOOR: Any member of the Public or the City Council may make an announcement of special events or meetings of interest as information to Council and Public. Any member of the pub lic may comment on any matter within the City Council’s jurisdiction which is not on the agenda. Please state your name for the record. Action will not be taken on an item that is not on the agenda. If it requires action, it will be r eferred to staff and/o r pla ced on a futu re agenda. City C ouncil members or City staff may briefly respond to s tatements made or questions posed as permitted by Government Code Section 54954.2. In order that all interested parties have an opportunity to speak, please limit comments to a maximum of four (4) minutes. Any member of the public may comment on any matter listed on this agenda at the time the matter is being considered by the City Council.
7. CONSENT AGENDA FOR THE SUCCESSOR AGENCY TO THE F ORMER MARINA REDEVELOPMENT AGENCY: Background information has been provided to the S uccessor Agency of the former Redevelopment Agency on all matters listed under the Consent Agend a, and these item s are considered to be r outine. Al l items under the Consen t Agenda ar e normally approved by one motion. Prior to such a motion being made, any member of the public or the City Council may a sk a qu estion or make a comment a bout an agenda i tem an d staff wil l provide a response. I f discussion or a lengthy explanation is requ ired, that item will b e removed from the Consent Agenda for Successor Agency to the former Marina Redevelopment Agency and placed at the end of Other Action Items Successor Agency to the former Marina Redevelopment Agency.
8. CONSENT AGENDA: Background information has been provid ed to the City Council, Airport Commission, Marina Abrams B Non-Profit Corporation, and Redevelopment Agency on all matters listed under the Consent Agenda, and these items are considered t o be routine. All items under the Consent Agenda are normally appro ved by one motion. Prior to such a motion being made, any member of the public or the City Council may ask a question or make a comment about an agenda item and staff will provide a respon se. If discussion or a lengthy ex planation is required, that item will be removed from the Consent Agenda and placed at the end of Other Action Items. a. ACCOUNTS PAYABLE:
(1) Accounts Payable Check Numbers 100827-100915, totaling $823,409.67 Accounts Payable for the Successor Agency Check Numbers 92-93, totaling $4,505.00 b. MINUTES:
(1) September 7, 2022, Regular City Council Meeting
(2) September 20, 2022, Regular City Council Meeting
c. CLAIMS AGAINST THE CITY: None
Agenda for City Council Meeting of Thursday, October 6, 2022 Page 4
d. AWARD OF BID: None
e. CALL FOR BIDS:
(1) City Council consider adopting Resolution No. 2022-, approving advertising and call for bids for the City of Marina Municipal Impro vements On-Call Contract 2022.
f. ADOPTION OF RESOLUTIONS: None
g. APPROVAL OF AGREEMENTS:
(1) City Council consider adopting Resolution No. 2022- awarding a constr uction contract for th e California Avenue Pedestrian Crossing Installation Project to Monterey Peninsula Engineering of Marina, CA for the total bid in the amount of $ 404,148.00; and allocating and a ppropriating additional funding in the amount of $120,000 from the Public Facil ities Impact Fee Intersection Fund to project HSR2005 for a total project funding of $565,000; and authorizing the City Manager to execute contract documents , subject to final review and approval by the City Attorney; and authorizing the City Manager or his designee to expend up to an additi onal 10% of the contract amount for potential construction contingencies and to execute all construction change orders on behalf of the City ; and authorizing the Finance Director to ma ke necessary accounting and budgetary entries.
h. ACCEPTANCE OF PUBLIC IMPROVEMENTS: None
i. MAPS: None
j. REPORTS: (RECEIVE AND FILE): None
k. FUNDING & BUDGET MATTERS: None
l. APPROVE ORDINANCES (WAIVE SECOND READING): None
m. APPROVE APPOINTMENTS: None
9. PUBLIC HEARINGS:
a. City Council Open a public hearing, take public testimony, and consider adopting resolution 2022-, determining that the proposed Tentative Map amendment is consistent with the certifie d EIR (SCH No. 2004091167) and adopted University Villages Specific Plan (now the Dunes on Montere y Bay), approving an amendment to the Tentative Subdivision Map originally approved in 2005 (Resolution 2005-131) as amended (Resolution No. 2008 -209), and approving Tree Re moval Per mits for Phase 2 West and Phase 3 Residential of the Specific Plan, as una nimously recommended by the Planning Commission of the City of Marina. b. City Council open a public hearing , take testimony from the public and read by title only and approve first reading of Ordinance No. 2022-, amending Marina Municipal Code, Title 5 t o modify Section 5.32.090 to allow the as signment of a second cardroom permit in the Marina Municipal Code. Continued from September 7, 2022.
This item to be continued to October 18, 2022
10. OTHER ACTIONS ITE MS OF THE SUCCESSOR A GENCY TO THE FORMER MARINA REDEVELOPMENT AGENCY: Action listed for each Agenda item is that which is requested by s taff. The Successor Agency may, at its d iscretion, take action on any ite ms. The public is invited to approach the podium to provide up to four (4) minutes of public comment.
Agenda for City Council Meeting of Thursday, October 6, 2022 Page 5
11. OTHER ACTION ITEMS: Action listed for each Agenda item is that which is requested by staff.
The City Council may, at its discretion, take action on any items. The public is invited to approach the podium to provide up to four (4) minutes of public comment.
Note: No additional major projects or prog rams should be undertaken w ithout r eview of the impacts on existing priorities (Resolution No. 2006-79 – April 4, 2006). a. City Council consider adopting Resolution No. 2022-, receiving update presentation for the Sports Center, Aquatic Center, Connector Building and outdoor Sports Pavilion (City of Marina Sports Complex) and associated site work ; a pproving expanded architectural and professional services for the Aqua tic Center, and Connector building; advancing architectural building and site design to 100% level, preparing bidding documents and architectural support services during construction; approving COAR’s proposal of $858,500 for the expanded architectural and professional services.
b. City Council consider a dopting Resolution No. 2022, a pproving Amendment No. 2 to the On-Call Architectural Services agreement between the City of Marina and Jeff Katz Architecture (JKA) changing the name of the firm from Jeff Kat z Architecture (JKA) to COAR Design Group and increasing the annual contract limit amount to $2,000,000 for fiscal year 2022-2023; and authorizing the City Manager to execute the amendment on behalf of the City subject to final review and approval by the City Attorney.
c. City Council consider adopting Resolution No. 2022 -, receiving a presentation on the Sea Haven Park playground ; and approve the allocation and appropriation of $650,000 from the Park Impact Fee Fund for enhanced playground features which are beyond the dev elopers funding commitm ent for the p ark and previously allocated Park Impact Fee funds; and Authorize the City Manager or his designee to execute a purchase and sales agreement for the playground equ ipment and installation; and authorize the Finance Director to make necessary accounting and budgetary entries.
12. COUNCIL & STAFF INFORMATIONAL REPORTS:
a. Monterey County Mayor’s Association [Mayor Bruce Delgado] b. Council and staff opportunity to ask a question for clarification or make a b rief report on his or her own activities as permitted by Government Code Section 54954.2.
13. ADJOURNMENT:
CERTIFICATION
I, Anita Sharp, Deputy City Clerk, of the City of Marina, do hereby certify that a copy of the foregoing agenda was posted at City Hall and Co uncil Ch ambers Bulletin Board at 211 Hi llcrest Avenue, Monterey County Library Marina Branch at 190 Seaside Circle, City Bulletin Board at the corne r of Reservation Road and Del Monte Boulevard on or before 6:30 p.m., Friday, September 30, 2022.
___________________________________
ANITA SHARP, DEPUTY CITY CLERK
City Council, Airport Commission and Redevelopment Agency meetings are recorded on tape and available for public review and listening at the Office of the City Clerk and kept for a period of 90 days after the formal approval of MINUTES.
Agenda for City Council Meeting of Thursday, October 6, 2022 Page 6
City C ouncil meetings may be vie wed live on the me eting nigh t and at 1 2:30 p.m. and 3:00 p.m. on C able Channel 25 on the Sunday following the Regular City Council meeting date. In addition, Council meetings can be vi ewed at 6:30 p.m. every Monday, Tuesd ay and W ednesday. For more inform ation ab out viewing the Council Meetings on Channel 25, you may contact Access Monterey Peninsula directly at 831-333-1267.
Agenda items a nd staff reports are public record and are available f or public review on the City's website (www.ciytofmarina.org), at the Monterey County Marina Library Branch at 190 Seaside Circle and at the Office of the City Clerk at 211 Hillcrest Avenue, Marina between the hours of 10:00 a.m. 5:00 p.m., o n the Monday preceding the meeting.
Supplemental ma terials r eceived after the close of the f inal agenda and through noo n on the day of the scheduled meeting wil l be avai lable for public review on the City ’s website:
https://www.cityofmarina.org/DocumentCenter/Index/1854.
Members of the public may receive the City Council, Airport Commission and Successor Agency of the Former Redevelopment Agency Agenda at a cost of $55 per year or by providing a self-addressed, stamped envelope to the City Clerk. The Agenda is also available at no cos t via ema il b y notifying th e City Clerk at [email protected]
ALL MEETINGS A RE OP EN TO THE PUBLIC. THE CIT Y OF M ARINA DOES NOT DISCRIMINATE AGAINST PERSONS WITH D ISABILITIES. Council Chambers are whee lchair accessible. meetings are broadcast on cable channel 25 and recordings of meetings can be provided upon request. to request assistive listening devices, sign language interpreters, readers, large print agendas or other accommodations, please call (831) 884-1278 or e-mail: [email protected]. requests must be made at least 48 hours in advance of the meeting.
U p c o m i n g 20 2 2 M e e t i n g s o f t h e C i t y C o u n c i l , A i r p o r t C om mi s s i o n, M a r i n a A b r a m s B N o n - P r o f i t C or p o r a t i o n , P r e s t on P ar k S u s ta i n ab le C o m m u n i t y N o n p r o f i t C o r p or a t i o n , S u c ce s s o r A g e n c y o f t h e F o r m e r R ed e v e l o p me n t A g e n c y a n d M a r i n a Gr ou ndw a t e r S u s t a i n a bi l i t y A g e n c y Re g u l a r M eet i n g s : 5: 0 0 p . m . C l o s e d S e s s i o n; 6 : 30 p .m . R e g u la r O p e n S e s s i o n s
Tuesday, October 18, 2022
Tuesday, November 1, 2022
Tuesday, November 15, 2022
Tuesday, December 6, 2022
Tuesday, December 20, 2022
** Regular Meeting rescheduled due to Religious Holiday NOTE: Regular Meeting dates may be rescheduled by City Council only. _________________________________________
CI T Y H A L L 2022 HO L I D AY S
(City Hall Closed)
Veterans Day ---------------------------------------------------------- Friday, November 11, 2022 Thanksgiving Day ------------------------------------------------ Thursday, November 24, 2022 Thanksgiving Break -------------------------------------------------- Friday, November 25, 2022 Winter Break ------------------------ Friday, December 23, 2022-Friday, December 30, 2022 __ ___ __ _ _ _ ______ __ _ ___
Agenda for City Council Meeting of Thursday, October 6, 2022 Page 7
2022 COMMISSION DATES
Upc o m i n g 2 022 Me et in g s of P l a n n i n g C o m m i s s i o n 2nd and 4th Thursday of every month. Meetings are held at the Council Chambers at 6:30 P.M.
October 13, 2022 November 10, 2022
October 27, 2022 December 18, 2022
MST VANPOOL PROGRAM
IN PARTNERSHIP WITH
COMMUTE ENTERPRISE
PRESENTED BY CRISTY SUGABO, MOBILITY SERVICES MANAGER
Agenda Item: 5a
MST Vanpool
Mobility option Innovative and sustainable
shared mobility
New Incentive to reduce
the high cost to commuting
MST Vanpool
MST is offering monthly subsidy of $450.00
◦ Lessen financial burden to participants
◦ Subsidy per van/van group per month
◦ Encourage participation
Employers can also support their employees
◦ By contributing to the vanpool cost
◦ Attractive option for their workforce
Existing Commute Enterprise Vanpools within the County
◦ There are currently 29 vanpools in the County
◦ Commute Enterprise will transition participant to MST’s program ◦ MST to capture ridership data for National Transit Data (NTD) reporting
MST Vanpool
Customized to participants needs
◦ Vanpool can accommodate four or more vanpoolers
◦ Remaining cost is split among participants
◦ Each rider paying set fee per month
◦ Choose qualifying vanpool vehicle
◦ Accessible vehicles is available
◦ Choose to upgrade with optional features
Commute with Enterprise Support
◦ Personal use allowed (may not exceed allowable miles) ◦ 24-hour roadside assistance
◦ Liability insurance
◦ Scheduled maintenance
◦ Complete clean starter kits
MST Vanpool
How to participate
◦ MST will make the connection
◦ Two ways to apply for vanpool
◦ Visit www.mst.org
◦ Call customers service at 1-888-678-2871
◦ Commute Enterprise Representative will process the
enrollment
MST Vanpool
“ Keeping our communities connected by way of directly operated bus service or through partnerships and programs like vanpools supports our vision for healthy community, and access to opportunities for everyone by reducing their cost of Mobility ”
- MST General Manager/CEO, Carl Sedoryk
MST Vanpool
Questions
5b
5c
Bank Account: 905 - Chase - Checking
Check 09/23/2022 100827 Accounts Payable 2NDNATURE Software Inc. 8,499.00 Invoice Date Description Amount.
18-832-11 05/31/2022 Marina Retention Ponds 8,499.00
Check 09/23/2022 100828 Accounts Payable Ace Hardware 100.44 Invoice Date Description Amount.
083068 09/18/2022 Car wax for engines at station 2 50.21 083050 09/15/2022 AA Batteries for both stations 50.23
Check 09/23/2022 100829 Accounts Payable Ace Hardware 127.93 Invoice Date Description Amount.
082915 08/30/2022 chair holder 58.03
082849 08/23/2022 smoke alarm 69.90
Check 09/23/2022 100830 Accounts Payable Ace Hardware 31.66 Invoice Date Description Amount.
083049 09/15/2022 Janitor Sink 7.64
082994 09/09/2022 Lily's Office 6.56
083061 09/16/2022 Park and Rec 17.46
Check 09/23/2022 100831 Accounts Payable Allstar Fire Equipment Inc. 1,351.91 Invoice Date Description Amount.
242564 09/14/2022 Red Head Universal Spanner Set 1,129.20 242563 09/14/2022 Fire Hooks, Rubbish Hook, 6' round with Alum D- Grip 222.71 Check 09/23/2022 100832 Accounts Payable Ana Maria Cordero 100.00 Invoice Date Description Amount.
22005 09/16/2022 City of Marina - K. Ruelas 100.00
Check 09/23/2022 100833 Accounts Payable Andersen's Lock & Safe, Inc. 448.65 Invoice Date Description Amount.
42543 09/13/2022 Teen Center Shed 115.65
42545 09/14/2022 City Hall 101.50
42367 09/15/2022 City Hall 130.00
42548 09/16/2022 Preston Park 101.50
Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 1 of 8 9/22/2022 8:52:34 AM
Agenda Item: 8a
1 Check 09/23/2022 100834 Accounts Payable AT & T 242.83 Invoice Date Description Amount.
Aug-Sep 520 5 09/13/2022 AT&T 831-582-9957 520 5 242.83 Check 09/23/2022 100835 Accounts Payable AT & T 652.76
Invoice Date Description Amount.
000018775315 09/13/2022 BAN #9391023434 167.08
000018775278 09/13/2022 CALNET3-9391023436 (239-461-6578) 70.54 000018787501 09/15/2022 CALNET3-9391023435 (237-267-6922) 184.16 000018787470 09/15/2022 CALNET3-9391023482 (884-0985) 24.87 000018787472 09/15/2022 CALNET3-9391023485 (884-2573) 25.80 000018787477 09/15/2022 CALNET3-9391023490 (884-9568) 46.38 00001787478 09/15/2022 CALNET3-9391023491 (884-9654) 85.87 000018787466 09/15/2022 BAN #9391023478 48.06
Check 09/23/2022 100836 Accounts Payable Avaya, Inc. 12.49 Invoice Date Description Amount.
2734605651 09/04/2022 Acct #0100828859 12.49
Check 09/23/2022 100837 Accounts Payable Bear Electrical Solutions, Inc. 950.00 Invoice Date Description Amount.
16600 08/28/2022 City Traffic Signal 950.00
Check 09/23/2022 100838 Accounts Payable Bound Tree Medical 65.44 Invoice Date Description Amount.
84680655 09/12/2022 Acct #113790 65.44
Check 09/23/2022 100839 Accounts Payable Branch's Janitorial 2,059.47 Invoice Date Description Amount.
228461 08/25/2022 Custodial Services for August 2022 2,059.47 Check 09/23/2022 100840 Accounts Payable Bruce Leleua 200.00 Invoice Date Description Amount.
09-10-22 vd 09/10/2022 Deposit Refund - Vince DiMaggio 200.00 Check 09/23/2022 100841 Accounts Payable California Department of Forestry and Fire Pr.
4,057.15
Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 2 of 8 9/22/2022 8:52:34 AM
2 Invoice Date Description Amount.
0000001471288 09/16/2022 Salinas East 2,042.46
0000001471297 09/16/2022 Salinas East 2,014.69
Check 09/23/2022 100842 Accounts Payable California Department of Justice 145.00 Invoice Date Description Amount.
601239 09/06/2022 Cust #110312 145.00
Check 09/23/2022 100843 Accounts Payable Cintas Corporation 222.12 Invoice Date Description Amount.
4131667840 09/16/2022 Cust# 833-711-5963 50.94
4131667884 09/16/2022 Acct# 16670750 - Mat Service 09/16/22 69.30 4126201347 07/22/2022 Cust# 833-711-5963 50.94
4123485952 06/24/2022 Cust# 833-711-5963 50.94
Check 09/23/2022 100844 Accounts Payable Community Hospital of the Monterey Peninsula
54.00 Invoice Date Description Amount.
09-08-22 09/08/2022 Guarantor #12252 - Aug 2022 54.00
Check 09/23/2022 100845 Accounts Payable Copware 965.00 Invoice Date Description Amount.
86103 09/01/2022 Subscription #MSF11355 965.00
Check 09/23/2022 100846 Accounts Payable CSG Consultants 16,553.00 Invoice Date Description Amount.
46202 09/09/2022 Hampton Inn (120 Reservation Road) 1,452.00 46203 09/09/2022 Sea Haven Phase 4 Map/Plan Review 338.00 46204 09/09/2022 Seacrest Apartments 3108 Seacrest Ave 792.00 46206 09/09/2022 Via Del Mar Subdivision (3220 Abdy Way) 1,299.00 46207 09/09/2022 Sea Haven Phase 4 Rough Grading 7,260.00 46208 09/09/2022 Home2Suites by Hilton 792.00
46209 09/09/2022 Via Del Mar 396.00
46210 09/09/2022 Quick Quack Carwash 4,224.00
Check 09/23/2022 100847 Accounts Payable Cypress Coast Ford Lincoln 102.45 Invoice Date Description Amount
Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 3 of 8 9/22/2022 8:52:34 AM
3 .
367419 09/15/2022 Fire Dept 102.45
Check 09/23/2022 100848 Accounts Payable Emergency Vehicle Specialists 1,980.15 Invoice Date Description Amount.
14324 09/20/2022 USB Hub -Whelen Low Profile Opticom Emitter 1,980.15 Check 09/23/2022 100849 Accounts Payable Epic Aviation 42,271.01 Invoice Date Description Amount.
7607179 09/14/2022 AVGAS 100LL 42,271.01
Check 09/23/2022 100850 Accounts Payable FedEx 77.59
Invoice Date Description Amount.
7-871-56820 09/02/2022 Acct #3995-9218-6 77.59
Check 09/23/2022 100851 Accounts Payable First Alarm 928.14 Invoice Date Description Amount.
707702 09/15/2022 Alarm Monitoring - Corp Yard - Oct-Dec 2022 333.87 707704 09/15/2022 Alarm Monitoring- Building 527 741 Neeson Rd- Oct-Dec 2022 355.62 707703 09/15/2022 Alarm Monitoring - Building 524 761 Neeson Road - Oct-Dec 2022 113.67 704332 09/15/2022 Acct#100081595 - Monitoring Services at Station 2 124.98 Check 09/23/2022 100852 Accounts Payable First American Title Company 400.00 Invoice Date Description Amount.
12814-12814290 08/26/2022 Preliminary Report APN 031-101-039 400.00 Check 09/23/2022 100853 Accounts Payable Formation Environmental, LLC 8,383.75 Invoice Date Description Amount.
7185 09/16/2022 Groundwater Sustainability Plan 8,383.75 Check 09/23/2022 100854 Accounts Payable Hinderliter, de Llamas & Associates 7,494.49 Invoice Date Description Amount.
July 2022 08/23/2022 July 2022 BL Admin Fee 7,494.49
Check 09/23/2022 100855 Accounts Payable IDN-Wilco 154.16 Invoice Date Description Amount.
9929905-00 09/13/2022 City Padlocks 154.16
Check 09/23/2022 100856 Accounts Payable IntelliSite, LLC 852.00 Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 4 of 8 9/22/2022 8:52:34 AM
4 Invoice Date Description Amount.
2149 09/19/2022 1 year NetCloud Mobile Essential Plan 852.00 Check 09/23/2022 100857 Accounts Payable Kimley-Horn & Associates 10,288.00 Invoice Date Description Amount.
22280839 08/31/2022 Marina LRSP 1,510.50
22280840 08/31/2022 2021 Dev Impact Fee 3,475.50
22280842 08/31/2022 Marina HSIP Cycle 11 5,302.00
Check 09/23/2022 100858 Accounts Payable Language Line, LLC 195.39 Invoice Date Description Amount.
10612798 08/31/2022 Acct #9020101064 195.39
Check 09/23/2022 100859 Accounts Payable Marina Backflow Co. 390.00 Invoice Date Description Amount.
2328 09/14/2022 Back Flows 390.00
Check 09/23/2022 100860 Accounts Payable Marina Coast Water District 6,059.63 Invoice Date Description Amount.
000056043 083122 08/31/2022 761 Neeson Road/Airport 207.21 000056044 083122 08/31/2022 781 Neeson Road/Airport 150.82 000056051 083122 08/31/2022 721 Neeson Road/Airport 280.73 000056092 083122 08/31/2022 741 Neeson Road/Airport 1,211.84 000056096 083122 08/31/2022 3271 Imjin Road/Airport 107.88 000056097 083122 08/31/2022 3200 Imjin Road/Airport 494.82 000056087 090922 09/09/2022 Crescent Ave/Costa Del Mar Irrigation 27.26 000056030 090922 09/09/2022 Crescent Ave/Reser Rd/Ramada Inn 36.77 000056084 090922 09/09/2022 Crescent/Shuler/Irrigation 27.26 000056085 090922 09/09/2022 Crescent/Whitney Irrigation 27.26 000056032 090922 09/09/2022 Crescent Ave/Costa Del Mar East Side 60.52 000056015 090922 09/09/2022 Corner of Cardoza & Dolphin Circle 60.52 000056034 090922 09/09/2022 3240 De Forest Road 531.48
000056014 090922 09/09/2022 3200 Del Monte Blvd 1,992.05 000056086 090922 09/09/2022 Crescent Ave/Sirena Del Mar Irrigation 27.26 000056011 090922 09/09/2022 3254 Abdy Way (Tate-Park Irrigation) 89.02 Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 5 of 8 9/22/2022 8:52:34 AM
5 000056098 090922 09/09/2022 3254 Abdy Way (Tate Park-Building) 50.60 000056008 090922 09/09/2022 Reservation & Del Monte 27.26 000056049 083122 08/31/2022 Imjin Rd (Irrigation/Backflow Accts) 199.34 08-31-22 08/31/2022 Acct# 000056041 - 3260 Imjin Road 323.60 08-31-22 PD 08/31/2022 Acct #014874000 126.13
Check 09/23/2022 100861 Accounts Payable Maynard Group Inc. 688.28 Invoice Date Description Amount.
300259 09/14/2022 Acct # CIT900 688.28
Check 09/23/2022 100862 Accounts Payable Monterey County Department of Health 2,000.00 Invoice Date Description Amount.
MRN-PD FY 22-23 08/24/2022 Retainer Invoice 2,000.00
Check 09/23/2022 100863 Accounts Payable Monterey Regional Waste Management District
92.40 Invoice Date Description Amount.
3678243 09/15/2022 Cypress Knolls 34.30
3678167 09/15/2022 Cypress Knolls 58.10
Check 09/23/2022 100864 Accounts Payable Office Depot 232.25 Invoice Date Description Amount.
264864125001 09/02/2022 Office Supplies 198.39
264198265001 09/07/2022 Cheryl Stamp 33.86
Check 09/23/2022 100865 Accounts Payable Pacific Gas & Electric 22,915.99 Invoice Date Description Amount.
Aug-Sep 720-0 09/11/2022 PG&E - 0167505720-0 867.61
Aug-Sep 562-0 09/12/2022 PG&E - 4758891562-0 978.44
Aug-Sep 085-2 09/11/2022 PG&E - 5434906085-2 104.60
Aug-Sep 148-6 09/09/2022 PG&E - 5593414148-6 239.78
Aug-Sep 943-2 09/09/2022 PG&E - 6150212943-2 81.46
Aug-Sep 347-0 09/15/2022 PG&E - 6258961347-0 861.00
Aug-Sep 202-3 09/15/2022 PG&E - 6594070202-3 112.81
Aug-Sep 582-7 09/09/2022 PG&E - 8161432582-7 145.32
Aug-Sep 353-7 09/09/2022 PG&E - 9930567353-7 53.14
Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 6 of 8 9/22/2022 8:52:34 AM
6 Aug-Sep 103-6 09/09/2022 8030427103-6 5,236.26
451-7Sept22 09/09/2022 8600650451-7 3271 Imjin Rd 266.62 103-6.Aug22-Adj 08/12/2022 8030427103-6 (Gas Correction difference) 3200 Imjin Rd 3,581.50 608-2.Sept22 09/11/2022 7383993608-2 3260 Imjin Rd Bldg 514 878.12 767.2.Sept22 09/11/2022 2652040767-2 751 Neeson Rd Bldg 526 14.46 098-7.Sept22 09/11/2022 6800558098-7 761 Neeson Rd Bldg 524 7,664.19 694-1.Sept22 09/11/2022 7269284694-1 721 Neeson Rd Bldg 533 1,098.57 Aug-Sep 827-8 09/19/2022 PG&E - 0423929827-8 133.62
Aug-Sep 210-0 09/20/2022 PG&E - 3242976210-0 173.68
Aug-Sep 851-0 09/15/2022 PG&E - 3440977851-0 176.44
Aug-Sep 535-3 09/14/2022 PG&E - 6161832535-3 248.37
Check 09/23/2022 100866 Accounts Payable Quill Corporation 1,331.72 Invoice Date Description Amount.
27342402 08/26/2022 Acct # 7474999 337.54
27315790 08/25/2022 Acct # 7474999 449.74
27342610 08/26/2022 Acct # 7474999 500.76
27344863 08/26/2022 Acct # 7474999 43.68
Check 09/23/2022 100867 Accounts Payable Rafael Huerta 100.00 Invoice Date Description Amount.
08-20-22 vd 08/20/2022 Rental Refund 100.00
Check 09/23/2022 100868 Accounts Payable Raul Aguilar 250.00 Invoice Date Description Amount.
08-27-22 vd 08/27/2022 Rental Refund - Vince DiMaggio 250.00 Check 09/23/2022 100869 Accounts Payable Sierra Springs & Alhambra 94.35 Invoice Date Description Amount.
14225799 091322 09/13/2022 209 Cypress Ave Annex 94.35
Check 09/23/2022 100870 Accounts Payable Tri County Fire Protection 161.77 Invoice Date Description Amount.
SY105423 09/07/2022 VD Park 161.77
Check 09/23/2022 100871 Accounts Payable Verizon Wireless 776.15 Invoice Date Description Amount
Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 7 of 8 9/22/2022 8:52:34 AM
7 .
9915450354 09/20/2022 Monthly Verizon Bill-308174766 776.15 Check 09/23/2022 100872 Accounts Payable Marina Employees Association 135.00 Invoice Date Description Amount.
09-16-22 09/16/2022 24 - MEA Dues 135.00
Check 09/23/2022 100873 Accounts Payable Marina Professional Fire Fighters Association
300.00
Invoice Date Description Amount.
09-16-22 09/16/2022 35 - MPFFA Dues 300.00
Check 09/23/2022 100874 Accounts Payable Rachel Smith 784.56 Invoice Date Description Amount.
Sep 19 2022 Trav 09/21/2022 Training 9/19-20/2022 784.56 EFT 09/23/2022 2567 Accounts Payable HdL Coren & Cone 122003396 / 0004155262 2,025.00 Invoice Date Description Amount.
SIN019972 07/18/2022 Contract Services Property Tax: July - September 2022 2,025.00 EFT 09/23/2022 2568 Accounts Payable Marina Police Association-MPOA 322271627 / 901587928 240.00 Invoice Date Description Amount.
09-16-22 09/16/2022 23 - MPOA Dues 240.00
EFT 09/23/2022 2569 Accounts Payable Police Officers Association - POA 322271627 / 901589106 1,296.00 Invoice Date Description Amount.
09-16-22 09/16/2022 25 - POA Dues 1,296.00
905 Chase - Checking Totals: Transactions: 51 $149,839.08 Checks: 48 $146,278.08
EFTs: 3 $3,561.00
Marina, CA LIVE
AP Check Register 9.23.2022
Bank Account: 905 - Chase - Checking
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 8 of 8 9/22/2022 8:52:34 AM
8 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
905 - Chase - Checking
Check
100875 09/30/2022 Open Accounts Payable Ace Hardware $191.05 Invoice Date Description Amount
083057 09/16/2022 Airport $99.37
083128 09/27/2022 Shop $67.67
083114 09/26/2022 PD Bathroom $24.01
100876 09/30/2022 Open Accounts Payable Amaris Harris $250.00 Invoice Date Description Amount
09-17-22 vd 09/17/2022 Rental Refund - Vince DiMaggio $250.00 100877 09/30/2022 Open Accounts Payable Andersen's Lock & Safe, Inc. $1,053.95 Invoice Date Description Amount
41791 09/21/2022 208 Palm Ave PD $1,053.95
100879 09/30/2022 Open Accounts Payable Bound Tree Medical $3,349.75 Invoice Date Description Amount
84674940 09/07/2022 Medical Supplies - Gloves, bandages & other misc items
$3,080.41
84674941 09/07/2022 Medical Supplies - Hand sanitizers & disinfectant sprayer
$102.03
84676865 09/08/2022 Medical Supplies - Test strips, glucose meter and microdot
$167.31
100880 09/30/2022 Open Accounts Payable Branch's Janitorial $2,886.35 Invoice Date Description Amount
228475 09/23/2022 Custodial Services for September 2022 $2,886.35 100881 09/30/2022 Open Accounts Payable Bureau Veritas North America, Inc. $382.44 Invoice Date Description Amount
RI 22054202 09/14/2022 Bureau Veritas - Commercial Plan Review $382.44 100882 09/30/2022 Open Accounts Payable Chavan & Associates LLP $9,500.00 Invoice Date Description Amount
C&A-17569 09/22/2022 FY21-22 City Audit $9,500.00
100883 09/30/2022 Open Accounts Payable Petty Cash $1,880.05 Invoice Date Description Amount
Petty Cash 9/22 09/23/2022 Replenish Petty Cash 9/22 $1,880.05 100884 09/30/2022 Open Accounts Payable Comcast $176.29 Invoice Date Description Amount
08-14-22 08/14/2022 Teen Center Cable Fees $176.29
100885 09/30/2022 Open Accounts Payable Don Chapin Company, Inc. $35,857.11 Invoice Date Description Amount
72757 09/22/2022 Streetlight Replacement $35,857.11
100886 09/30/2022 Open Accounts Payable East Bay Tire Co. $410.63 Invoice Date Description Amount
1871471 09/21/2022 Back Hoe $410.63
100887 09/30/2022 Open Accounts Payable Fastenal Company $961.91 Invoice Date Description Amount
CASAL155184 09/12/2022 PD $301.07
CASAL155225 09/14/2022 Premixed $660.84
Thursday, September 29, 2022Pages: 1 of 5user: Rogah Satof Payment Register
Marina, CA LIVE
From Payment Date: 9/30/2022 - To Payment Date: 9/30/2022 9 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100888 09/30/2022 Open Accounts Payable First Alarm $1,086.72 Invoice Date Description Amount
703918 09/15/2022 Alarm Monitoring - Council Chambers - Oct-Dec 2022 $118.02 703919 09/15/2022 Burglar Alarm Monitoring - 209 Cypress Ave - Oct-Dec 2022
$131.43
703977 09/15/2022 Alarm Monitoring - 304 Hillcrest Ave - Oct-Dec 2022 $640.26 707701 09/15/2022 Fire Alarm Monitoring - 209 Cypress Avenue - Oct-Dec 2022
$197.01
100889 09/30/2022 Open Accounts Payable Home Depot Credit Service $129.79 Invoice Date Description Amount
09-13-22 09/13/2022 PW Credit Purchases 6035 3225 0395 9813 $129.79 100890 09/30/2022 Open Accounts Payable Jeff Katz Architectural Corp. $14,762.50 Invoice Date Description Amount
21258 08/31/2022 Marina Aquatic and Sports Center Design Phase $14,762.50 100891 09/30/2022 Open Accounts Payable Keyser Marston Associates $14,816.15 Invoice Date Description Amount
0037017 07/08/2022 Keyser Marston Associates - Marina Station through 6/30/22
$14,738.05
0037068 08/04/2022 Keyser Marston - Marina Station through 7/31/22 $78.10 100892 09/30/2022 Open Accounts Payable Kimley-Horn & Associates $1,102.00 Invoice Date Description Amount
097789008-08022 08/31/2022 Imjin Parkway PS&E $1,102.00 100893 09/30/2022 Open Accounts Payable La Sirenita Tree Service $2,300.00 Invoice Date Description Amount
9-20-22 09/20/2022 Reindollar Perc Pond $2,300.00
100894 09/30/2022 Open Accounts Payable Mandell Municipal Counseling $203.00 Invoice Date Description Amount
09-07-22 09/07/2022 Professional Services - Revenue Advice - Cannabis - August 2022
$203.00
100895 09/30/2022 Open Accounts Payable Marina Coast Water District $194.95 Invoice Date Description Amount
000056007 091522 09/15/2022 Caif Ave/North of 3rd $89.02 000056025 091522 09/15/2022 327 Reindollar Ave $69.16
000056027 091522 09/15/2022 Calif Ave at Reindollar $36.77 100896 09/30/2022 Open Accounts Payable Monterey County Convention & Visitors Bureau
$20,472.05
Invoice Date Description Amount
16172 04/01/2022 Jurisdiction Investment - FY 21-22 Q4 (April-June) $20,472.05 100897 09/30/2022 Open Accounts Payable Monterey Peninsula Engineering $432,487.50 Invoice Date Description Amount
08-23 09/13/2022 Glorya Jean Tate Park Site Improvements and Pump Track
$432,487.50
100898 09/30/2022 Open Accounts Payable MyFleetCenter - Wisconsin Quick Lube
$78.66
Invoice Date Description Amount
36774914 09/22/2022 PD $78.66
Thursday, September 29, 2022Pages: 2 of 5user: Rogah Satof Payment Register
Marina, CA LIVE
From Payment Date: 9/30/2022 - To Payment Date: 9/30/2022 10 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100899 09/30/2022 Open Accounts Payable Newton Bros. Tire & Auto $35.00 Invoice Date Description Amount
435944 09/23/2022 PD $35.00
100900 09/30/2022 Open Accounts Payable Overhead Door Company $435.00 Invoice Date Description Amount
127338 09/13/2022 Police & Fire $435.00
100901 09/30/2022 Open Accounts Payable Pacific Crest Engineering $2,358.80 Invoice Date Description Amount
11190 08/31/2022 Glorya Jean Tate Park Site Improvements and Pump Track
$2,358.80
100902 09/30/2022 Open Accounts Payable Pacific Gas & Electric $25,467.13 Invoice Date Description Amount
July-Aug 313-66 08/31/2022 PG&E 6793435313-6 $8,683.31
Aug-Sep 533-8 09/18/2022 PG&E - 2253666533-8 $102.23
Aug-Sep 272-1 09/19/2022 PG&E - 2862559272-1 $41.99
Aug-Sep 795-7 09/21/2022 PG&E - 4467294795-7 $424.09
Aug-Sep 172-2 09/20/2022 PG&E - 5618207172-2 $741.80
Aug-Sep 362-9 09/20/2022 PG&E - 5996678362-9 $126.30
Aug-Sep 683-2 09/19/2022 PG&E 6217294683-2 $1,062.07
Aug-Sep 483-6 09/15/2022 PG&E - 3982644483-6 $14,285.34 100903 09/30/2022 Open Accounts Payable Pinnacle Healthcare $202.00 Invoice Date Description Amount
390320 09/26/2022 Pinnacle Healthcare - Pre Emp Px $202.00 100904 09/30/2022 Open Accounts Payable RDO Equipment Co. $55.47 Invoice Date Description Amount
P2880438 09/23/2022 City Backho $55.47
100905 09/30/2022 Open Accounts Payable Regional Government Services $281.25 Invoice Date Description Amount
13987 08/31/2022 Professional Services - HR Department - August 2022 $281.25 100906 09/30/2022 Open Accounts Payable Rincon Consultants, Inc. $39,627.20 Invoice Date Description Amount
42111 09/14/2022 Marina Housing Element Update $8,342.50 42561 09/21/2022 RIncon-Marina On-Call GIS Services 8/1/2022 through 8/31/2022
$2,282.50
42450 09/19/2022 Rincon-Marina DVSP $29,002.20
100907 09/30/2022 Open Accounts Payable South Coast Emergency Vehicle Service
$8,411.89
Invoice Date Description Amount
509621 09/20/2022 Fire Department $8,411.89
100908 09/30/2022 Open Accounts Payable Taygeta Scientific, Inc. $2,000.00 Invoice Date Description Amount
000423-R-0045 09/01/2022 Computer Network Defense - September 2022 $2,000.00 100909 09/30/2022 Open Accounts Payable TechRx Technology Services $1,098.63 Invoice Date Description Amount
10339 08/31/2022 youth center desktop $1,098.63
Thursday, September 29, 2022Pages: 3 of 5user: Rogah Satof Payment Register
Marina, CA LIVE
From Payment Date: 9/30/2022 - To Payment Date: 9/30/2022 11 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100910 09/30/2022 Open Accounts Payable Timothy Huynh $500.00 Invoice Date Description Amount
MBA-072422 09/23/2022 Claim MBA-072422 $500.00
100911 09/30/2022 Open Accounts Payable Valley Saw & Garden Equipment $32.71 Invoice Date Description Amount
313991 09/23/2022 Landscaping Supplies $32.71
100912 09/30/2022 Open Accounts Payable Verde Design, Inc. $14,995.38 Invoice Date Description Amount
1br-2121701 09/01/2022 Dunes Park Development Project $14,995.38 100913 09/30/2022 Open Accounts Payable Verizon Wireless $15.20 Invoice Date Description Amount
9913702659 09/09/2022 Rec Dept Cell Phone Bills $15.20
100914 09/30/2022 Open Accounts Payable Wellington & Rathie $8,632.00 Invoice Date Description Amount
26238 09/16/2022 Joby Aero Inc - July 2022 $120.00
26235 09/16/2022 Code Enforcement Matters - July 2022 $140.00 26234 09/16/2022 Cannabis Matters - July 2022 $240.00
26236 09/16/2022 Election Matters - July 2022 $60.00
26237 09/16/2022 General Matters - July 2022 $80.00
26240 09/16/2022 Marina Equestrian Center - July 2022 $160.00 26233 09/16/2022 Marina Municipal Airport Matters - July 2022 $460.00 26241 09/16/2022 Misc Personnel Matters - July 2022 $4,912.00 26239 09/16/2022 Land Use & Operations - July 2022 $2,460.00 100915 09/30/2022 Open Accounts Payable William A. Thayer Construction, Inc $21,802.58 Invoice Date Description Amount
2021-12-2 09/07/2022 Desert Star Office Bldg 518 at 3261 Imjin Rd $20,492.60 2021-07-RET 06/15/2022 Marina Airport 533 Added Doors $1,309.98 Type Check Totals: 40 Transactions $670,483.09
Thursday, September 29, 2022Pages: 4 of 5user: Rogah Satof Payment Register
Marina, CA LIVE
From Payment Date: 9/30/2022 - To Payment Date: 9/30/2022 12 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
EFT
2583 09/30/2022 Open Accounts Payable Richard B. Standridge $3,087.50 Invoice Date Description Amount
22-19 09/23/2022 Service 9/12-22/2022 $3,087.50
Type EFT Totals: 1 Transactions $3,087.50
905 - Chase - Checking Totals
Checks Status Count Transaction Amount Reconciled Amount Open 40 $670,483.09 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 40 $670,483.09 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 1 $3,087.50 $0.00
Reconciled 0 $0.00 $0.00
Total 1 $3,087.50 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 41 $673,570.59 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 41 $673,570.59 $0.00
Grand Totals:
Checks Status Count Transaction Amount Reconciled Amount Open 40 $670,483.09 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 40 $670,483.09 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 1 $3,087.50 $0.00
Reconciled 0 $0.00 $0.00
Total 1 $3,087.50 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 41 $673,570.59 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 41 $673,570.59 $0.00
Thursday, September 29, 2022Pages: 5 of 5user: Rogah Satof Payment Register
Marina, CA LIVE
From Payment Date: 9/30/2022 - To Payment Date: 9/30/2022 13 Bank Account: 921 - Chase - Successor Agency
Check 09/23/2022 92 Accounts Payable Keyser Marston Associates 1,505.00 Invoice Date Description Amount.
0037175-R 08/31/2022 Prof Srvs August 2022 1,505.00
Check 09/23/2022 93 Accounts Payable U.S. Bank 3,000.00 Invoice Date Description Amount.
6642925 09/07/2022 Trustee Fees-Dunes Bond 2018 A 3,000.00 921 Chase - Successor Agency Totals: Transactions: 2 $4,505.00 Checks: 2 $4,505.00
Marina, CA LIVE
SA Check Register 9.23.2022
Bank Account: 921 - Chase - Successor Agency
Batch Date: 09/23/2022
Type Date Number Source Payee Name EFT Bank/Account
Transaction
Amount
User: Rogah Satof Pages: 1 of 1 9/22/2022 8:43:35 AM
14 Agenda Item: 8b(1)
City Council Meeting of
October 6, 2022
MINUTES
Wednesday, September 7, 2022 5:00 P.M. Closed Session
6:30 P.M. Open Session
REGULAR MEETING
CITY COUNCIL, AIRPORT COMMISSION,
MARINA ABRAMS B NON-PROFIT CORPORATION, PRESTON PARK SUSTAINABLE
COMMUNITY NON-PROFIT CORPORATION, SUCCESSOR AGENCY OF THE FORMER
MARINA REDEVELOPMENT AGENCY AND MARINA GROUNDWATER
SUSTAINABILITY AGENCY
Council Chambers
211 Hillcrest Avenue
Marina, California
Zoom Meeting URL: https://zoom.us/j/730251556
Zoom Meeting Telephone Only Participation: 1-669-900-9128 - Webinar ID: 730 251 556 In accordance with California Government Code §54953(e)(1)(A) and (C) and the Proclamation of a State of Emergency issued by Governor Newsom on March 4, 2020, under the provisions of Government Code §8625 related to the COVID -19 (coronavirus) pandemic, consistent with recommendations by State and local health officials regarding social distancing and in order to prevent an imminent risk to the health and safety of attendees as determ ined in Resolution 2022-105, public participation in City of Marina City Council public meetings shall be electronic only and without a physical location for public participation until the earlier of May 31, 2022, or such time as the City Council may ado pt a resolution in accordance with Government Code §54953(e)(3). This meeting is being broadcast “live” on Access Media Productions (AMP) Community Television Cable 25 and on t he City of Marina Channel and on the i nternet at https://accessmediaproductions.org/
1. CALL TO ORDER
2. ROLL CALL & ESTABLISHMENT OF QUORUM: (City Council, Airport Commissioners, Marina Abrams B Non -Profit Corporation, Preston Park Sustainable Communities Nonpr ofit Corporation, Successor Agency of the Former Redevelopment Agency Members and Ma rina Groundwater Sustainability Agency)
Cristina Medina Dirksen, David Burnett, Lisa Berkley, Mayor Pro -Tem/Vice Chair Kathy Biala, Mayor/Chair Bruce C. Delgado
3. CLOSED SESS ION: As permitted by Government Code Sect ion 54956 et seq., the (City Council, A irport Commissioners, Marina Abrams B Non -Profit Corporation, Preston Park Sustainable Communities Nonpr ofit Corporation, Successor Agency of the Former Redevelopment Agency M embers and Ma rina Groundwater Sustainabili ty Agency) may adjourn to a C losed or E xecutive Session to consider specific matters dealing with litigation, certain personnel matters, property negotiations or to confer with the City’s Meyers -Milias- Brown Act representative.
1 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 2
a. Conference with Legal Counsel, Anticipated Litigation, Significant exposure to litigation pursuant to § 54956.9(b): Three cases
6:30 PM - RECONVENE OPEN SESSI ON AND REPORT ON ANY ACTIONS TAKEN I N
CLOSED SESSION
Heidi Quinn, City Attorney reported out Closed Session: Council met in Closed Session with regard to the item listed under 3a, Council received information, provided direction and no reportable action was taken.
4. MOMENT OF SILENCE & PLEDGE OF ALLEGIANCE (Please stand)
5. SPECIAL PRESENTATIONS:
a National Recovery Month Proclamation, Sun Street Center b Jacob’s Heart Childhood Cancer Awareness Month Proclamation c Monterey Peninsula College 75th Anniversary Proclamation
6. SPECIAL ANNOUNCEMENTS AND COMMUNICATIONS FROM THE FLOOR: Any member of the Public or the City Council may make an announcement of special events or meetings of interest as information to Cou ncil and Public. Any member of the pub lic may comment on any matter within the City Council’s jurisdiction which is not on the agenda. Please state your name for the record. Action will not be taken on an item that is not on the agenda. If it requires action, it will be r eferred to staff and/o r pla ced on a futu re agenda. City C ouncil members or City staff may briefly respond to stat ements made or que stions posed as permitted by Government Code Section 54954.2. In order that all interested parties have an opportunity to speak, please limit comments to a maximum of four (4) minutes. Any member of the public may comment on any matter listed on this agenda at the time the matter is being considered by the City Council. • Fernando Munzo – Spoke about leaving messages with the Mayor and City Manager regarding a conversation with police chief Nieto during a non-sanctioned event. Looking to have a sit-down meeting with the City Manager and Mayor to discuss this conversation but was told city can't take any stake in it that it was on her own time.
• Amy Warren – Instructor for Guitars Not Guns P rogram an d a nnounced that the Marina Teen Center Guitars Not Guns band just perf ormed at the West End Festival 2 weekends ago .
Encourage anyone who's interested in le arning guitar we're playing more guitar to stop by the Team Center any Saturday morning between 10 am and noon . C oncerned that the public comments published online for tonight's meeting are incomplete hopes that before the meeting continues where at some point, somebody could check and make sure all the public comments are actually publicly available.
• Brian McCarthy – Shocked along with some other residents to see the item regarding the card room license on tonight's agenda, which has now been pulled. Commented on the language in the staff report about staff having no concerns proposal Municipal code change . Spoke about gambling addiction statistics in California. Wou ld like to see a robust discussion before Council makes a decision on amending the municipal code to allow for a non-conform abandoned use. • Pat Grant – Asked if it was true that the city staff has spent time and money to significantly increase gambling in our town? Sad that they would degrade the quality of life in our city. • Jeff Markham – Commented on staff proposal to address Patto n Parkway erosion issue, but disappointed that tonight's regular meeting of the City Council does not include an update o n the problems in Cypress Knolls. Requested that an update be provided by city staff. 2 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 3
• Roger Frik – Expressed appreciation for your l eadership and the Council members who supported the work on that wall.
• Jasmine – Expressed concerns about the speed lim it along Imjin P arkway and asked i f c ouncil considered redlight cameras? Commented on the cardroom matter and con cerned about the sitemap location and ask if that site map had a footprint on the Monterey San Gilia along the on ramp to highway one.
• Tommy Bolea – Spoke about the developments taking place in North and South Marina and central Marina dying because of it. Commented on bu ilding a new fire station at 3056 Del Monte Blvd ; and the accident study. Spoke about the new car wash going in next to Walmart and the water that will be use and the noise.
• Karen Andersen – Asked when will the fire department start extinguishing the fires in the old derelict duplexes in Cypress Knolls so that the smoke and toxic fumes from those fires aren't being spread all over the neighborhoods . S upport Jasmine's comments regarding San Gil ia as an environmentally protected habitat there around the high school, and the reduction of the speed limit on Imjin Parkway.
• Glenn Woodson – Requested that the city of Marina ad dress in a public meeting or form how the traffic studies are be ing adjusted to deal with the whole expanding building that's going on at the Dunes area. Commented on CalTrans not expan ding bridge on westbound Imjin and the traffic congestion along 2nd Ave in the mornings. Briefly comment on the MST Surf Line project. • Nancy Amadeo – Informed the public that the Planning Commission makes land use decisions, and all meeting are open to the public for comment and can request to receive agenda via the websit e.
Council makes policy decisions and the only time they would be seen by the City Council would be if they had been denied. and the applicant is appealing . Thanked the public works and traffic committee for putting up barriers along Cardoza so quickly. Commented about the startup of the commissions.
• Council Member Burnett – Questioned the process about have pervio us speaker talk about an ite m that in on the agenda but then that item was continued to another meeting. • Council Member Medina Dirksen – Announced MPUSD will be having a Marina High new Multi- use Pro Field Project community meeting and feedback session September 2 9th from 5 to 6 :30 at the Marina High School Cafe. Also announced this Friday, Saturday, and Sunday the Friends of the Marina L ibrary will be having a book sa le; Saturday will be at face painting free clothing exchange free produce and Food courtesy of the Food Bank and a dad's read featuring our own district for staff assistant Eric Mora. Asked if agenda item 11a could be heard next. Hats off to fire department and public works for responding to the fires, and that have been plaguing the barracks. • Mayor Delgado – Spoke about the Labor Day event held at the Vince DiMaggio Park last Saturday. Saturday, we had a cleanup along the woods near Salinas Avenue, behind Preston Park and kudos to Police Department and Public Works Department, they worked hard with the Gavilan prisoner crew from Soledad prison to trim up a lot of oak trees, remove a lot of dead, ugly pine trees that were fire h azards and ugly so t hat whole place now is safer . This coming Sunday. We have a cleanup on monthly cleanup starts at 10:00am and end at noon meet at 10 :00am at the southern junction of Lapis Road and Del Monte Boulevard. On September 17th Friends of Marina Parks is backed by popular demand, and their first return project. Volunteers are encouraged to go to Windy Hill Park at the top of DeForest Road and the east end of Beach Road where they'll be spreading chips, sweeping sidewalks and doing other things to spruce up the Windy Hill Park from 9:00-Noon.
3 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 4
7. CONSENT AGENDA FOR THE SUCCESSOR AGENCY TO THE FORMER MARINA REDEVELOPMENT AGENCY: Background information has been provided to the Successor Agency of the former Redevelopment Agency on all matters listed under the Consent Agenda, and these item s are considered to be routine. All items under the C onsent Agenda ar e normally approved by one motion. Prior to such a motion being made, any member of the public or the City Council may a sk a quest ion or make a comment a bout an agenda item and s taff wil l provide a response. If discus sion or a lengthy explanation is requ ired, that item will b e removed from the Consent Agenda for Successor Agency to the former Marina Redevelopment Agency and placed at the end of Other Action Items Successor Agency to the former Marina Redevelopment Agency.
8. CONSENT AGENDA: Background information has been provid ed to the City Council, Airport Commission, Marina Abrams B Non-Profit Corporation, and Redevelopment Agency on all matters listed under the Consent Agenda, and these items are consi dered to be rou tine. All items under the Consent Agenda are normally appro ved by one motion. Prior to such a motion being made, any member of the public or the City Council may ask a question or make a comment about an agenda item and staff will provide a response. If discussion or a lengthy explanation is required, that item will be removed from the Consent Agenda and placed at the end of Other Action Items. a. ACCOUNTS PAYABLE:
(1) Accounts Payable Check Numbers 100567- 100757, totaling $1,900,383.03 b. MINUTES:
(1) August 3, 2022, Special City Council Meeting
(2) August 16, 2022, Regular City Council Meeting
c. CLAIMS AGAINST THE CITY: None
d. AWARD OF BID: None
e. CALL FOR BIDS: None
f. ADOPTION OF RESOLUTIONS:
(1) City Council consider adopting Resolution No. 202 2-110, regarding the Ralph M. B rown Ac t (California Go vernment Code §§5495 0-54963, making c ertain findings; and authorizing t he city to continue to i mplement remote teleconferenced public meetings of the City Coun cil and its constituent bodies for the period September 20, 2022, through October 20, 2022. g. APPROVAL OF AGREEMENTS:
(1) City Council co nsider adopting Resolution No. 2022 -111, approving a Professional Services Agreement with Raimi+Associates for the preparation of Objective Design Standards for an amount not to exceed $167,000; authorize the Finance Director to make necessary accounting and budgetary entries; and authorize the City Manager t o execute the Agreement on beha lf of C ity with Raimi+Associates subject to final review by the City Attorney. h. ACCEPTANCE OF PUBLIC IMPROVEMENTS: None
i. MAPS: None
j. REPORTS: (RECEIVE AND FILE):
(1) City Council receive Investment Reports for the City of Marina, City of Marina as Successor Agenc y to the Marina Redevelopment Agency, and Pre ston Park Sustainable Community Non-Profit Corpor ation (PPSC -NPC) for the quarter ended Jun 30, 2022.
4 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 5
k. FUNDING & BUDGET MATTERS:
(1) City C ouncil consider adopting Resolution No. 2022 -112, approving the allocation and appropriation of $95,000 from unallocated General Funds to the Capital Im provement Program adding the Patton Parkway Retain ing Wall Repair Project HSR2201; and authorizing Finance Director to m ake ne cessary accounting and budgetary entries
l. APPROVE ORDINANCES (WAIVE SECOND READING): None
m. APPROVE APPOINTMENTS: None
Denise Turley, 8g(1) asked what is the project about?
Mayor Pro Tem pulled agenda item 8k(1) for quick discussion BERKLEY/BIALA: TO APPROVE THE CONSE NT AGENDA MINU S 8k(1). 5-0-0-0 Motion Passes by Roll Call Vote.
8k(1)
Mayor Pro Tem B iala asked that additional language be add ed to the resolution, second Where as to include the following language: “on March 10, 2022, the City Manager and the Mayor Pro Tem conduct with a site tour with residents residing at 3 0 0, 2 Independence Avenue to assess the level of erosion along patent parkway after this resident sent multiple photos of the area affected” DELGADO/BERKLEY: TO APPROVE AGENDA ITEM 8k(1) WITH THE ADDI TIONAL LANGUAGE SUGGESTED. 5-0-0-0 Motion Passes by Roll Call Vote
9. PUBLIC HEARINGS:
a. City Council open a public hearing, take testimony from the public and read by title only and approve first reading of Ordinance No. 2022-, amending Marina Municipal Code, Title 5 to modify Section 5.32.090 to allow the a ssignment of a second cardroom permit in the Marina Municipal Code. Continued to October 6, 2022
10. OTHER ACTIONS ITE MS OF THE SUCCE SSOR AGENC Y TO THE FORMER MARINA R EDEVELOPMENT AGEN CY: Action l isted for each Agenda item is that which is requested by staff. The Successor Agency may, at its discretion, take action on any items. The pu blic is invited to approach th e pod ium to provide up to four (4) minutes of public comment.
11. OTHER ACTION ITEMS: Action listed for each Agenda item is that which is requested by staff.
The City Council may, at its discretion, take action on any items. The public is invited to approach the podium to provide up to four (4) minutes of public comment.
Note: No additional major projects or p rograms should be undertaken w ithout review of the impacts on existing priorities (Resolution No. 2006-79 – April 4, 2006). a. City Council consider adopting Resolution No. 2022-113, approve a concessionaire agreement with Chaparral Country Corporation, In c. of Woodside CA to provide recreational faci lities and programs to the public at t he Marina Equestrian Cen ter Park; and authorize the City Manager to execute the agreement on behalf of the City subject to final review and approval by the City Attorney; and direct staff to provide notice to vacate to the Marina Equestrian Association.
5 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 6
Council Questions: We're not talking about other possibilities for concessionaires or what's wrong with Chaparral or what's wonderful about Chaparral we're just speaking about the agreement, correct? with Chaparral or what's wonderful about Chaparral we'r e just speaking about the agreement , correct? What are the rules for things We talk about closed session in closed session? Would it be appropriate to discuss this contract in cl osed session since we’re talking about real property terms and conditions? Regarding the let ters from Panetta and Lynch , c an the public speak about the two new pieces of information in the pa cket? Are there mat erial or non -material changes in th e new 16-page agreement presented to Council tonight? What is the current zo ning for this property? If it's zone Park and we assess it fair market value because we want t o buy it from the National Park Service, is it fair market value of park property as the highest and best use given that that’s its zoning? If we were to tr try to transfer the property to other government entities, such as the county capable of operating the site as a public park under NPS regulations, from what you know about the County do you think they would be interested? A ccording to public comment that's comi ng in the last couple of days there is a new lawsuit, and there was an old lawsuit. but the old lawsuit may have been required to have been disclosed when the R FP, Section F(b) proposers were required to provide a listing of any lawsuit initiated with the last 5 years. Chaparral Ranch said they had none, but apparently there was a case in the County of San Meto that was not disclosed, was the 2018 case disclosed? With the new lawsuit is there anything we should be aware of? It was mentioned that volunteer holiday celebrations would be allowed under into the future , are you aware that those holiday celebrations in the past were put on by the Marina Equestrian Association Volunteers? Who do you think might step in to fill the shoes of those organizers of those large holiday celebrations that have been occurring at this at the question center? Did you know that it was a 22 hour a day endeavor that the Question Association Volunteers provided for the emergency evacuation of those horses ? Do you think that in the future there will be groups that would step forward for 22 hours a day, several days in a row for emergency evacuations if there's no more volunteers at the equestrian center? So just for clarification here. These options that We're talking about this is going to be decided by the Department of the Interior and City Council has no voice in that, correct? So to the extent that the contract itself is to have some tweaks or changes to it, is there a timeframe that the NPS would allow us to make some, you kn ow, continue to make minor revisions to it before they would shut that off ? If we choose to buy i t (the land) the land still gets turned back over to the National Parks Service and the GSA then we would be competing like any other potential buyer for the price of that property , correct? On page 11 of the agreement is it listed that the base rent will be increasin g of the 5-year period? Why would we be starting off at a base that actually is lower than what the M EA is currently paying? Where is the f unding going to come from for the ADA restrooms? What is Chaparral committing to do as far as improvements? Will a timeline and schedule of performance be placed in the agreement for Chaparral? At what point do we go back to increasing the rent? What is David Seigenthaler’s official title? The letter for Panetta and the letter that followed from N PS was there direct communication between Congre ssman Panetta and Mr.
Lynch? What is the status of that communication today? Is Mr. Lynch t he boss of Seigentha ler? What is the reporting relationship? How much money are we anticipating the city to put into the MEC to get it up to minimal standards before handing it over? Who in the city will oversee the maintenance? Can we name someone and put it into the agr eement? The preservation of historic buildings, is it the concessionaire or the city ’s prerogative to designate historical sites that we want to keep preserved? How is the process done? Who provided us the options that we're considering tonight was this options that staff generated? Or was this options that only that had to be approved by the NPS? Is there room for other options? Does the NPS have to approve any other options? How is the private boarding of horse belonging to a corporation any differ ent than courses belongi ng to a nonprofit? How does the NPS know that we ’re not in compliance? What is the MEA currently paying? Does the fact that one's a profit for profit, and the other a nonprofit make any difference in how much we charge rent? The Asbestos/Lead Based Paint Report, is it true that horse will be boarded in these buildings, and or is it true that courses will be boarded in buildings with historic significance? 6 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 7
Is there some requirements as to when you have historic buildings, how th ey must be maintained? Might we incur liability if a horse was injured or ill, because of the conditions of lead, based paint or and or asbestos in our buildings ? How w ell was the property inventoried? Since a year has lapsed between the time the agreem ent the concession aire was selected in your experience in contracts/agreements what would you consider material changes to the material information that may or may not would litigate investigations by outside organizations, governmental organizations ? What if there is a change in their financial circumstances , what would happen then? Page 34 of our packet , Exhibit B, just to get confirmation is that the agreement that we're talking about is the 13.176 acres that comprise identified object s C & D on the ma p only, the other parcels are not part of this agreement , correct? Do you see a need to add language to the contract that specifies that that parking area shall remain public access? Page 13 in the original concession agreement item, 11 d reads “the city shall provider repairs and upgrades to infrastr ucture designated and exhibit h in a timely manner with unavailable funding available to city after the repairs and upgrades concessionaire, and at its own expense shall be responsible for maintenance of the infrastructure as designated in exhibit h”. Do you see a need to add a similar paragraph for the concessiona ire that he would, you know, complete the upgrades or upgrade complete whatever he's going to do in a timely manner ? Is there a need to add language that the concession aire shall abide by prevailing wage? Can we do an inve ntory of all the equipment out at the MEC that belongs to the city? Are there re-evaluation periods in this agreement along with the automatic rene wals? If city were to purchase the park, do we have an estimated cost?
Does a no vote on staff recommendation indicate the city will not compl y with the NPS , that it will automate, revert one of those 4 options that was spelled in the Lynch letter? The 1998 quit claim deed, the 1998 program of utilization all allow for some long-term boarding is that is that a correct statement? What legal venue do we go to, to object if we think a there's a poor written record ? Is there a Lands appeal board to hear these kinds o f conflicts? If we negate the RFP where we have already awarded Chaparral is the concessionaire doesn't that open us up to a lawsuit ? Did the NPS officially approve the 1998 POU?
Delgado/Medina Dirksen: not approve lease with chaparral country, and that we direct staff to discuss with National Park service the other options, such as getting an appraisal, the fair market value, and other options that they list.
Substitute Motion
Burnett/Berkley: we approve the selection of chaparral as defined in the agenda, and that we, continue to revive the operating agreement with the items that have been discussed this evening and asked Staff to come back with a updated agreement for discussion and final approval (Motion Withdrawn) Council Member Berkley seconded with an amendment as follows: that we approve the concessionaire agreement; and
(1) to first, visit and do appropriate inventory of all items (2) that we increase the base rent Once improvements are completed by year 2, and that rent should be kept in line with some type of index that should never fall below fair rental value after the first 6 months
(3) that we should include historic preservations of buildings to highlight their historic importance, (4) and we should include as part of item, 11d, which is on page 13 of the current document, that we have improvements to be made by the concessionair e in detail with a t imeline similar to what we did with the city;
(5) that we include prevailing wage as a requirement for all work done on the property that that be leased,
7 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 8
(6) that the parking lots be usable by all park visitors (7) that we have staff come back to us with these revisions within 30 days, and give notice by October first, and give it so that it's a ninety-day notification for vacate; (8) And that on January first of 2023 chaparral can begin their new concession air serve as our new concessionaire.
Council Member Burnett withdr ew his subs titute mot ion and Seconded Council Me mber Berkley’s amendments
New Substitute Motion
BERKLEY/BURNETT: that we approve the recommended agreement, and that we direct staff to do the following:
1. to first, visit and do appropriate inventory of all items
2. that we increase the base rent Once improvements are completed by year 2, and that rent should be kept in line with some type of index that should never fall below fair rental value after the first 6 months
3. that we sh ould include historic preservations of buildings to highlight their historic importance,
4. and we should include as part of item, 11d, which is on page 13 of the current document, that we have improvements to be made by the concessionair e in detail with a t imeline similar to what we did with the city;
5. that we include prevailing wage as a requirement for all work done on the property that that be leased,
6. that the parking lots be usable by all park visitors
7. that we have staff come back to us with these revisions within 30 days, and give notice by October first, and give it so that it's a ninety-day notification for vacate.
8. And that on January first o f 2023 chaparral can begin their new concession air serve as our new concessionaire.
Public Comments:
• Glenn Woodson – Commented on the changes could material affect, and this should be postponed until the entire council in public get a chance to review . A sked if this contract is a categ ory 1 or category 2? Given the contentious nature of this, we should be requesting that the contractor provide detailed se rvice level agreements and metrics that give c omplete transparency.
Commented o n the contract and asked mul tiple questions relating to compliance . Asked if concessionaire will be required to get appro val to expand or remove structures such as the HAM Radio station. Commented on RFP responses
• Margaret Davis – Agrees with Councilmember, Berkeley, and what Glenn just said that there needs to be a scheduler performance as t o what the tenant is going to do. Without them they are unenforceable. Opposes buying property that which is already used for free to accommodate non- resident borders . Spoke about possible issues with removing the MEA without installing a concessionaire. Noted that the city should allow Chaparral to move in as soon as possible after giving the notice, if for no other reason than saf ety. Reminded Council and the public that the historical buildings are a veterinary hospital for horses. They were designed to board horses and historically sick horses were boarded in the buildings.
8 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 9
• Cathleen Venn – Spoke about the classes she offers at the MEC at a discounted rate and the various different program s and event s that take place without any city acknowledgement. Expressed concerns about Chap arral’s intensions to use the barns to house the h orses. The barns lack adequate ventilation, and no opportunity for horses to look outside. Spoke about proper ventilation for the barn/stalls; spoke about newly emerging veterinary research indicat ing acceptable space standard for housing horses. Commented on the historic buildings. • Julie – Commented on a June 13, 2018, NPS letter where they were seeking business proposals for the Rock Creek Park Horse Center in DC.
• Jennifer Pendergast – Commented on the list of shady things on Chaparral and doesn’t understand why, Marina is going into business with this corporation. Spoke about Chaparral ’s budget and GoFundMe page. Spoke about the current f ree activities provided at the MEC. Opp oses moving forward.
• Jenna Larkin – Spoke about the current volunteers might be conflicted with working with a for - profit c orporation being investigated by OSHA . Commented on the city not understanding the market value for boarding horses and the costs a ssociated with it. Commented on a statement made by Council Member Berkley regarding Jimmy Panetta. • Jeff Markham – Noted that the 1990 Quitclaim deed does not mention the Lands to Parks program with the NPS AND only mentions that the equestrian center be used for public for a public park in public recreational, recreational purposes. Feels the city has allowed itself to be bullied by the NPS with no remedies.
• Lindsey Beery – Commented on the RFP process and Chaparral ’s taxes/financials. Believes city staff knows that the concessionaire will fail and hopping it will be turned back over to the NPS and auctioned off to the highest bidder. Stated wanted a horse park but then neglected it. Believe the council is being pressured and bullied into making a decision that’s bad for the community. • Amy Warren – Commented on the letter from Jimmy Panetta’s office and the letter from David Siegenthaler’ s office. Noted the Equestrian Center is not like it use to be in 2007 and since 2012 the property has been available for public use . Commented on the MEA ’s boarding agreements, wait list, rotations. Stated MEA’s response to the RFP was not give a fair hearing. Spoke as to why the MEA can provide free or reduced lessons.
• Krystal – Stated that Chaparral’s response to the RF P provided fault docume nts. Read a quote made by Council Member Berkley from an article and asked if she still felt the same. Asked if the city council could disqualify Chaparral due to current documents and move forward with the second choice, the Marina Equestrian A ssociation? Asked that the MEA not be evicted unt il a contract has been signed so that the park is looked after and protected. Noted that the barns flood in the aisles as well as the tack rooms when it rains. Spoke on the current conditions of the barn stalls.
• Michelle Bacon – Commented on the con cessionaire agreement and stated that all agreem ents can be negotiat ed and any agreement that is non -binding is not executed. Anyone can change their mind. Believe council should reconsider their decision on Chaparral due to the new information being provid ed by the public . Spoke about the OSHA visits to Chaparral ’s location, and their budgets. Thinks that going back and revisiting this a nd looking into how it's worded ex actly one word can change everything with the national park service • Evan Kort – Supports Mayor Delgado’s motion.
• Andria Greene – Spoke about the MEA and what they provide at the MEC facility. As stewards of the city, mayor and Counter Council members it’s your job is to promote the public interests of our community. Commented on Chapa rral’s treatment of horses and reviews of their existing locations.
9 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 10
• Brian Mc Carthy – Thinks this issue has brought out the best in Marina, and I'm proud of community members on all sides of the issue . C oncerned that we keep using this term of private boarding and yet there's been codified definition of private boarding. Spoke about d escendants of Comanche which is a is a significant historical resource to the city of Mari na. Agrees with Congressman Panetta who said that we should be making our own decisio ns here. Believes we need to continue to talk about the fact that the amateur radio station is a part of this part. It's in the POU it's a vital resource to the city. Agrees that there is a poor relationship with the NPS. • Kate Spencer – Encourages the co uncil to look at all the options and do a cost/benefit analysis.
How m uch would the city actually have to put forward in order for chaparral to commence operations? Commented on contract details the city would be respons ible for and the dilapidated buildings wanting to be used. Council should investigate the fair market value of the property.
Commented on the lessons learned from a for-profit corporation getting low wages. • Paula Pelot – Noted that the concessionaire has already been selected and the comments coming in are te etering on the verge o f defamation. Stated that Rock Creek Park is not a Lands to Park program therefore, it is not restricted under the Land of Parks Act. Noted i t was a past council member who pointed out that the city was in vio lation of the deed and now it’s being remedied.
Support the motion and hope the council does too.
• Jasona Prowes – Asked how is a private corporation boarding their own h orses for profit use, with no regulations, no oversight, and no commu nity involvement better than public boarding facility that offers use to the entire community ? Let’s get creative and figure out a bet ter solution to the conflict of NPS regulation which says no private use.
• Gail Morton – Provided history of how Marina obtained the ME C and surrounding la nds. Noted The National Park Service under the Lands to Park has deemed that private boarding is a private use and they are against private use because of the covenant and the deed . Spoke about w hat are the responsibilities of the city f or this prop erty. Getting Chaparral in there and getting that operating as public park is what the city still needs to look at. Supports the motion. • Nichole Fisher – Asked if the discrepancies in Chaparral’s finances were ever explained and were they ma de public per the RFP? Spoke about conditions in the RFP that were not follo wed in Chaparrals response relating to lawsuits , litigations, claims and settlements . Commented on new information being presented by the public reg arding Chaparral. Thinks the r eevaluation of the current proposal would be appropriate, if not a disqualification altogether. Council should be given the opportunity to retract their original votes or delay the vote to allow time for due diligence. • Laura – Concerned about all the new information being presented by the public and Council should too. A sked why the city would put the MEC in the hands of an out-of-town corporation when a local non -profit has roots in the community ? The C enter is providing a great service to the community.
• Amanda Kort – Spoke of her equestrian family’s heritage. Believes an independent or neutral horse person should be brought to act as a consultant through this process. Also asked why the council will risk our community equestrian center and put it in the hands of a large corporation that does have a lot of red flags? Appreciates the Mayor motion. • Nancy Amadeo – Spoke about the relationships between the D epartment of Interior, the NPS and Lands to Parks program. Commented on the Program of Utilization, which was approved in 2013 minus the privat e boarding. Expressed concerns about buying back this park. In support of the motion. Spoke about the Mayor’s comment on giving the concessionaires agreement to Chaparral.
Spoke about the MEA members comments on how Marina can do this to them. 10 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 11
• Liesbeth Visscher – Noted that wo differ ent issues are being discussed and it is hard to accept for the current users, bu t City Co uncil already has made a decision a year ago. Supports Council Member Berkley’s motion.
• Jasmine Ruvalcaba – Commented on the cost , terms and conditions of the historical buildings in the agreement, specifically 11d . A sked what repairs will be done. What are the costs of the asbestos survey on the four bui ldings in Exhibit H. is it to remediate or cleanup? Commented and asked questions on the restroom s. Is there an estimate of the required building permits that are needed, and who will pay for those? Asked what kind of fr ee programs Chaparral would be offering?
• Denise Turley – Stated that over the 20 -years she’s live in the area she has never seen a horse or person on a horse and vehicle traffic near each other. Someone’s doing a good job of keeping them separate. Urged council to trust the process. Supports Council Member Berkley’s motion. • Greg Furey – Thinks the dye was cast when the city took over the property with the deed restrictions that were in place. Thinks the MEA has done a wonderfu l job but was painted into a corner a long time ago. Upsetting that people call up an d vilify an organization. Stated he visited Chaparrals other si tes. Commented on OSHA visits for any comp any that has work related accidents/injuries. Spoke about tour ists coming in and the gateway to the national monument.
Hopes council will make a decision that benefits the community. • Tommy Bolea – Stated that it ’s sad that we farm everything out to a third-party company. Noted that Monterey runs the swimming po ol with its employees , Marina should too. Spoke about the surrounding area adjacent to the MEC.
• Laura Hoover – Express support for Mayor Delgado’s resolution, the city still has options and no need to rush a decision. Take the time to make the right decision. • Amy – Spoke about the many people coming through that just want to see and touch the horses.
Commented that C haparral just p uts up a fence around thei r horses, and nobody's allowed to get near the horses unless you're paying customer . Hopes the public can still have access to the horses with no charge and be written in the contract.
Substitute Motion #2
Biala/Medina Dirksen: it has to d o with one. The b asic compliance issue is to terminate the agreement with MEA. that sets us in a compliant mode with the NPS; And then the other issue of the chaparral, we wait to make that decision on the next meeting, or whenever it can be available night the sooner the better; so that we get the some of the basic questions that were asked by some of the public and the and the Mayor and the Councilwoman Medina Dirksen to see what is valid about those comments
Council Member Medina Dirksen asked for an amendment to this substitute motion, that we send Notice to Vacate after we get answers to some question in a closed session meeting.
Council Member Berkley Called for the Question. 4-1(Delgado)-0-0 Mayor Delgado asked for Roll Call Vote for Substitute Motion #2 Council Member Medina Dirksen asked Mayor Pro Tem Biala to restate her substitute motion.
Restate Substitute Motion #2
Biala/Medina Dirksen: Direct staff to provide notice to vacate to the Marina Equestrian Association within 90 days. 1-4(Medina Dirksen, Burnett, Berkley, Delgado)-0-0 Substitute Motion # 2 Fails by Roll Call Vote
11 MINUTES for City Council Meeting of Wednesday, September 7, 2022 Page 12
Council Member Medina Dirksen asked for Council Member Berkley to restate her substitute motion Restated Substitute Motion
BERKLEY/BURNETT: TO ACCEPT THE AGREEMENT AND DIRECT STAFF TO DO THE FOLLOWING:
1. TO VISIT AND DO APPROPRIATE INVENTORY OF ALL ITEMS AFTER THE M EA HAS VACATED.
2. TO INCREASE THE BASE RENT O NCE THE IMPROVEMENTS ARE COMPLETED BY YEAR 2, THAT RENT SHOULD BE KEPT IN LINE WI TH SOME TYPE OF AN
INDEX AND SHOULD NEVER FALL BELOW FAIR RENTAL VALUE AFTER THE FIRST 6 MONTHS.
3. SHOULD INCLUDE HISTORIC PRESERVATION OF THE BUILDING S TO HIGHLIGHT THEIR HISTORIC IMPORTANCE.
4. PART OF THE CURRENT ITEM NUMBER 11 D. ON PAGE 13, THAT DESCRIBES THE RESPONSIBILITY OF THE CITY FOR IMPROVEMENTS. THAT IT SHOULD
ALSO DESCRIBE THE IMPROVEMENTS TO MADE BY THE CONCESSIONAIRE IN DETAIL, AND WITH A TIMELINE.
5. WE SHOULD INCLUDE MEN TION OF REQUIRED PREVAILING WAGE AS A REQUIREMENT FOR ALL WORK DONE ON THE PROPERTY.
6. WE SHOULD INCLUDE THE PARKING LOTS BE USABLE BY ALL PARK VISITORS.
7. THAT VOLUNTEERS BE INCLUDED, AS WAS ENCOURAGED TO PARTICIPATE IN THE PROCESS.
8. THAT WE GIVE NOTICE OF INTENT TO VACATE OR PLAN TO VACATE BY THE TENTH OF SEPTEMBER TO THE MEA, AND THAT THEY HAVE 90 DAYS.
9. STAFF TO COME BACK IN 45-DAYS WITH THE REVISIONS TO THE AGREEMENT.
10. THAT ON JANUARY 31, 2023, CHAPARRAL WILL TAKE OVER THE CONCESSIONAIRE.
11. THAT IN THE CONTRACT WE INCLUDE A BREACH OF A MATERIAL TERM AND ADD SOMETHING REGARDING ANY DISCOVERY OF FRAUD IN THE CONTRACT. 3-2(Medina Dirksen, Delgado)-0-0 Motion Passes by Roll Call Vote
12. COUNCIL & STAFF INFORMATIONAL REPORTS:
a. Monterey County Mayor’s Association [Mayor Bruce Delgado] b. Council and staff opportunity to ask a que stion for clarification or make a brief report on his or her own activities as permitted by Government Code Section 54954.2.
13. ADJOURNMENT: The Council meeting adjourned at 12:40 A.M.
Anita Sharp, Deputy City Clerk
ATTEST:
Bruce C. Delgado, Mayor
12 Agenda Item: 8b(2)
City Council Meeting of
October 6, 2022
MINUTES
Tuesday September 20, 2022 5:00 P.M. Closed Session
6:30 P.M. Open Session
REGULAR MEETING
CITY COUNCIL, AIRPORT COMMISSION,
MARINA ABRAMS B NON-PROFIT CORPORATION, PRESTON PARK SUSTAINABLE
COMMUNITY NON-PROFIT CORPORATION, SUCCESSOR AGENCY OF THE FORMER
MARINA REDEVELOPMENT AGENCY AND MARINA GROUNDWATER
SUSTAINABILITY AGENCY
Council Chambers
211 Hillcrest Avenue
Marina, California
Zoom Meeting URL: https://zoom.us/j/730251556
Zoom Meeting Telephone Only Participation: 1-669-900-9128 - Webinar ID: 730 251 556 In accordance with California Government Code §54953(e)(1)(A) and (C) and the Proclamation of a State of Emergency issued by Governor Newsom on March 4, 2020, under the provisions of G overnment Code §8625 related to the COVID -19 (coronavirus) pandemic, consistent with recommendations by State and local health officials regarding social distancing and in order to prevent an imminent risk to the health and safety of attendees as determin ed in Resolution 2022-110, public participation in City of Marina City Council public meetings shall be electronic only and without a physical location for public participation until the earlier of May 31, 2022, or such time as the City Council may ado pt a resolution in accordance with Government Code §54953(e)(3). This meeting is being broadcast “live” on Access Media Productions (AMP) Community Television Cable 25 and on t he City of Marina Channel and on the i nternet at https://accessmediaproductions.org/
1. CALL TO ORDER
2. ROLL CALL & ESTABLISHMENT OF QUORUM: (City Council, Airport Commissioners, Marina Abrams B Non -Profit Corporation, Preston Park Sustainable Communities Nonpr ofit Corporation, Successor Agency of the Forme r Redevelopment Agency Members and Ma rina Groundwater Sustainability Agency)
MEMBERS PRESENT: Cristina Medina Dirksen, David Burnett, Lisa Berkley, Mayor Pro-Tem/Vice Chair Kathy Biala, Mayor/Chair Bruce C. Delgado
3. CLOSED SESS ION: As permitted by Government Code Sect ion 54956 et seq., the (City Council, A irport C ommissioners, Marina Abrams B Non -Profit Corporation, Preston Park Sustainable Communities Nonpr ofit Corporation, Successor Agency of the Former Redevelopment Agency M embers and Ma rina Groundwater Sustainabili ty Agency) may adjourn to a C losed or E xecutive Session to consider specific matters dealing with litigation, certain personnel matters, property negotiations or to confer with the City’s Meyers -Milias- Brown Act representative.
a. Conference with Legal Counsel, Anticipated Litigation, Significant exposure to litigation pursuant to § 54956.9(b): One case
1 MINUTES for City Council Meeting of Tuesday, September 20, 2022 Page 2
b. Labor Negotiations
i. Marina Employee Association
ii. Marina Professional Fire Fighters Association
6:30 PM - RECONVENE OPEN SESSION AND REPORT ON ANY ACTIONS TAKEN IN
CLOSED SESSION
Staff determined prior to the meeting that the Closed Session portion of the meeting would be cancelled. No reportable action.
4. MOMENT OF SILENCE & PLEDGE OF ALLEGIANCE (Please stand)
5. SPECIAL PRESENTATIONS:
6. SPECIAL ANNOUNCEMENTS AND COMMUNICATIONS FROM THE FLOOR: Any member of the Public or the City Council may make an announcement of special events or meetings of interest as information to Council a nd Public. Any member of the pub lic may comment on any matter within the City Council’s jurisdiction which is not on the agenda. Please state your name for the record. Action will not be taken on an item that is not on the agenda. If it requires action, it will be referred to staff and/o r pla ced on a futu re agenda. City C ouncil members or City staff may briefly respond to stat ements made or que stions posed as permitted by Government C ode Section 54954.2. In order that a ll interested parties have an opportunity to speak, please limit comments to a maximum of four (4) minutes. Any member of the public may comment on any matter listed on this agenda at the time the matter is being considered by the City Council. • Liesbeth Vi sscher – Announced on Thursday, November 17, 2022 , the California Coastal Commission will hold a hearing on CalAm ’s proposed Desal Project. Stated the desal project will danger Marina’s drinking water due to saltwater intrusion. C heck out our website to get informed Www.Citizensforjustwater.org. Asking the public to give comments at the November 17 th Coastal Commission meeting either in person in Salians or hopefully also in Marina, where they might livestream.
7. CONSENT AGENDA FOR THE SUCCESSOR AGENCY TO THE FO RMER MARINA REDEVELOPMENT AGENCY: Background information has been provided to the S uccessor Agency of the former Redevelopment Agency on all matters listed under the Consent Agenda, and these item s are considered to b e routine. Al l items under the Consent Agenda a re normally approved by one motion. Prior to such a motion being made, any member of the public or the City Council may a sk a quest ion or make a comment a bout an agenda ite m and s taff wil l provide a response. If discussion or a lengthy explanation is req uired, that item wi ll b e removed from the Consent Agenda for Successor Agency to the former Marina Redevelopment Agency and placed at the end of Other Action Items Successor Agency to the former Marina Redevelopment Agency.
8. CONSENT AGENDA: Background information has been pr ovided to the City Council, Airport Commission, Marina Abrams B Non-Profit Corporation, and Redevelopment Agency on all matters listed under the Consent A genda, and these items are considere d to be routi ne. All items under the Consent Agenda are normally a pproved by one motion. Prior to such a motion being made, any member of the public or the City Council may ask a question or make a comment about an agenda item and staff will provide a res ponse. If discussion or a lengthy ex planation is required, that item will be removed from the Consent Agenda and placed at the end of Other Action Items. a. ACCOUNTS PAYABLE:
(1) Accounts Payable Check Numbers 100728-100826, totaling $506,613.81 b. MINUTES: None
2 MINUTES for City Council Meeting of Tuesday, September 20, 2022 Page 3
c. CLAIMS AGAINST THE CITY: None
d. AWARD OF BID: None
e. CALL FOR BIDS: None
f. ADOPTION OF RESOLUTIONS: None
g. APPROVAL OF AGREEMENTS:
(1) City Council consider adopting Resolution No. 2022-114, authorizing the City Manager to execu te a n Amendment to the Memorandum of Understanding between the City of Marina and the Mari na Professional Fire Fighters Association (MP FFA); authorizing adjustments to the City’s Salary Schedul e and Compensation Plan, and; authorizing Finance Director t o make appropriate accounting and budgetary entries.
h. ACCEPTANCE OF PUBLIC IMPROVEMENTS: None
i. MAPS: None
j. REPORTS: (RECEIVE AND FILE): None
k. FUNDING & BUDGET MATTERS: None
l. APPROVE ORDINANCES (WAIVE SECOND READING): None
m. APPROVE APPOINTMENTS: None
BURNETT/BERKLEY: TO APPROVE THE CONSENT AGENDA. 5 -0-0-0 Motion Passes by Roll Call Vote
9. PUBLIC HEARINGS: None
10. OTHER ACTIONS ITEMS OF THE SUCCE SSOR AGENC Y TO THE FORMER MARINA R EDEVELOPMENT AGEN CY: Action l isted for each Agenda i tem is that which is requested by staff. The Successor Agency may, at its discretion, take action on any items. The pu blic is invited to approach t he podium to provide up to four (4) min utes of public comment.
11. OTHER ACTION ITEMS: Action listed for each Agenda item is that which is requested by staff.
The City Council may, at its discretion, take action on any items. The public is invited to approach the podium to provide up to four (4) minutes of public comment.
Note: No additional major projects or prog rams should be undertaken w ithout review of the impacts on existing priorities (Resolution No. 2006-79 – April 4, 2006). a. City Council consider adopt ing Resolution No. 2022 -115, approving the Memorandum of Understanding (MOU) for the odor att ribution study between the ReGen Monterey (ReGen), Monterey One Water ( M1W), and the City of Marina and authorizing the City Manager to execute the amendment subje ct to final review and approval by the City Attorney, and authorizing the F inance Director to make necessary accounting and budgetary entries.
Council Questions: What is the timeframe for this study? It was mentioned in the report that SCS be doing the engineering services so who will be doing the study at are the environmental services, including writing all the reports the whole A-Z. or will someone else be doing the study? Who will be on the city, M1 or ReGen to oversee the study and review for editing purposes the f inal draft product? Who will be reviewing the draft before it’s finalized? Will the public, or the city council or ReGen, or M1 Water be seeing the draft, or only the final ? Will the public have any access or ReGen or 3 MINUTES for City Council Meeting of Tuesday, September 20, 2022 Page 4
Monterey One Water, to what the study is going to do in detail ? will public or anyone outside of SCS and city's staff have input to the study methodology to the guts of the study ? Will anyone have any input befo re the study launches and ends? Is there one document that's going to explain the methodology, etc prior to the release of this study? Will there be a 15-day comment period? There is a core group of citizen s involved in this, i s there a way to expand beyond those that are already in the know? Does the scope of work include the methodology? How do we create a benchmark when it is such an elusive thing that occurs ? Does this include ground samples as well? Is there a spot on our website for public engagement ? Have team members been vetted for conflicts of interests? On the evaluation committee, there was one public representative is it possible to know who that was or is that confidential? Are there any other roles that Greg Simmons can play in this process? Use of the complaint data over the past two years as part of the SCS database , how many actual complaints is that? On page 2, and 3 so the first one says that there's going to be 2 days conducting initial odor inspections and that's with this all-facto meter and in Section 2.4, it talks about the field investigation program, and this will take place approximately 2 weeks in the winter season , is that using that all - facto meter or is that some other different methodology? Landfill Gas wells (LFG), is that something that you access specifically, or do you run your own LFG well studies? ReGen is normally collecting the LFG data, is their LFG data useful in your study? You have a certain designated period of sample collection, but if someone during the study period calls MBARD, will you respond also and follow up, or is this just left as another complaint log in? What do we do if a majority of your testing days don’t’ detect odors? On one of the analyses for either of these 2 resolutions, it says that ReGen and Monterey One Monterey Water may elect to pay the city all or portions of their share in advance of expenses incurred, I wonder if that's going to be possible otherwise we would be out $150,000 for maybe 10 months? Can a non-discrimination clause be put into the contract like our other contracts?
BERKLEY/BURNETT: TO ADOPT RESOLUTION NO. 2022 -115, APPROVING THE
MEMORANDUM OF UNDERSTANDING (MOU) FOR THE ODOR ATTRIBUTION STUDY BETWEEN THE REGEN MONTEREY (REGEN), MONTEREY ONE WATER (M1W), AND
THE CITY OF MARINA AND A UTHORIZING THE CITY MANAGER TO EXECUTE THE
AMENDMENT SUBJECT TO FINAL REVIEW AND APPROVAL BY THE CITY
ATTORNEY, AND AUTHORIZING THE FINANCE DIRECTOR TO MAKE NECESSARY ACCOUNTING AND BUDGETARY ENTRIES. 5-0-0-0 Motion Passes by Roll Call Vote Public Comments:
• Denise Turley – Asked if they collect the data and the data isn't related to the smell but maybe it's a violation of air pollution standard is that data reported to the appropriate agency? Will the public be told that that data occurred on that date?
• Liesbeth Visscher – Asked who will pay if the cost will be more than a $150,000? • Brian McCarthy – Tracking this issue for a whi le now. Thinks it's a fantastic example of how involving residents can really strengthen the process . Worst outcome. is that this study would come back inconclusive because of a variety of possible conditions. Wanted to confirm that this is about odors that generate complaints from our community at larg e. Hopes SCS really understands our unique microclimates.
• Tommy Bolea – Commented on Marina ’s various climates and the way the wind blow. Spoke about the gasses that leach out of the ground at the landfill and noted the landfill is not a looped system. Spoke about global warming.
• Grace Silva-Santella – Thanked Mayor Pro Tem Biala for the confidence that she expressed and to Greg Simmons. Noted several citizens have been involved in this odor issue . Has confidence that 4 MINUTES for City Council Meeting of Tuesday, September 20, 2022 Page 5
Greg Simmons will be a fabulous citizen representative for us . Spoke about a former cou ncil member who brought posted complaints on social media . Supports the motion and moving forward on this and seeing the results.
• Greg Simmons – Involved in an information group and involved early on with the discussions about the odor study . Wasn ’t sure the study would come to fruition but There's been some good leadership coming out of the city . Noted the work by Brian and Saber we're very professional and very inclined at least for our group, and very open minded . Commented on the RFP and helping to review the proposals and the selection of SCS. Spoke about SCS experience and their scope of work for this project. Expressed his willingness to continue helping if asked.
b. City Council consider adopting Resolution No. 2022-116, approving a professional services agreement between the City of Marina and SCS Engineers for environmental services for the odor attrib ution study project ; and authorizing the city manager to execute the agreemen t on behalf of the City subject to final review and approval by the City Attorney.
Council Questions: None
BIALA/BERKLEY: TO ADOPT RESOLUTION NO. 2022 -116, APPROVING A
PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CIT Y OF MARINA AND SCS
ENGINEERS FOR ENVIRONMENTAL SE RVICES FOR THE ODOR ATTRIBUTION STUDY PROJECT; AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE
AGREEMENT ON BEHALF OF THE CITY SUBJECT TO FINAL REVIEW AND APPROVAL BY THE CITY ATTORNEY. 5-0-0-0 Motion Passes by Roll Call Vote Public Comments:
• Tommy Bolea – Expressed concerns that other agencies are not helping to pay the co sts for this study. Marina should not be footing the bill.
12. COUNCIL & STAFF INFORMATIONAL REPORTS:
a. Monterey County Mayor’s Association [Mayor Bruce Delgado] b. Council and staff opportunity to ask a que stion for clarification or make a b rief report on his or her own activities as permitted by Government Code Section 54954.2.
13. ADJOURNMENT: The meeting adjourned at 8:10 P.M.
Anita Sharp, Deputy City Clerk
ATTEST:
Bruce C. Delgado, Mayor
5 September 27, 2022 Item No. 8e(1)
Honorable Mayor and Members City Council Meeting of
of the Marina City Council October 6, 2022
CITY COUNCIL CONSIDER A DOPTING RESO LUTION NO. 202 2-,
APPROVING ADVERTISING AND CALL FOR BIDS FOR THE CITY OF MARINA MUNICIPAL IMPROVEMENTS ON-CALL CONTRACT 2022.
RECOMMENDATION:
It is recommended that the City Council consider:
1. Adopting Resolution No. 202 2-, approving advertising and call for bids for the City of Marina Municipal Improvements On-Call Contract 2022.
BACKGROUND:
On November 4, the City Council approved resolution no. 2020-141, awarding the Ci ty of Marina Municipal Improvements On-Call Contract to Don Chapin Company of Salinas, California.
On November 18, 2020, the City entered into an agreement with Don Chapins for on-call municipal improvements for an annual contract amount not to exceed $1 ,000,000, and an option for an additional one (1) year extension with a not to exceed annual funding limit of $1,000,000.
On March 9, 2022, the City executed amendment no. 1 to extend the agreement with Don Chapin for on-call municipal improvements until November 18, 2022.
On call contracts are util ized by agencies to respond to construction emergencies expeditiously and improve project delivery. Also, an on-call municipal improvements contract is similar to a job order contract, which will augment the City staff, and provide a readily available work force to repair existing City’s infrastructure, conduct emergency repairs and new construction, as the City deems appropriate for roadways, storm drain systems and other related work. In general, the work consists of repairs, replacement, and construction of concrete and hot mix asphalt pavements, curbs, gutters, sidewalks, sidewalk crossings, curb ramps, cross gutters , dikes, decomposed granite sidewalks, retaining walls, lighting, brick surfac ing, paver surfacing, interlocking pavers, catch basins, manholes, installation o f pipes and miscellaneous associated work at such times and locations as required.
ANALYSIS:
Having the on -call contract will help th e City quickly respond to construction emergencies , and deliver urgent projects on time and possible cost savings. As the process of bidding and selecting the next contractor may take a few months the staff intends to start the process so that wh en the existing agreement expires the City can immediately enter into a new agreement to prevent any gap for addressing any potential infrastructure improvement/maintenance needs.
FISCAL IMPACT:
This call for bids does not have fiscal impact for the City.
The contract with a successful bidder will be for a term of one (1) year with a not to exceed annual funding limit of $1,000,000. The agreement will include an option for an additional one (1) year extension with a not to exceed annual funding limit o f $1,000,000. The total term of this agreement will not exceed two (2) years. The amount of work to be requested duri ng the one year or optional additional year contract period cannot be well defined at the outset. Work shall be issued through Work Orders.
1 Work orders issued under this contract will be funded through respective approved Capital Improvement P roject funding. In the case of emergen cy repairs, staff will bring a budget appropriation recommendation to City Council for approval.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
The action of approving, advertising and call for bids for the City of Marina Municipal Improvements on Call Contr act for repair of existing infrastructure or emergency repair is not a project as defined by the California Environmental Quality Act (CEQA).
CONCLUSION:
This request is submitted for City Council consideration and action.
Respectfully submitted,
____________________________
Saber Messhenas, E.I.T
Assistant Civil Engineer
City of Marina
REVIEWED/CONCUR:
____________________________
Brian McMinn, P.E., P.L.S.
Public Works Director/City Engineer
City of Marina
________________________
Layne P. Long
City Manager
City of Marina
2 RESOLUTION NO. 2022-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA
APPROVING ADVERTISING AND CALL FOR BIDS FOR THE CITY OF MARINA MUNICIPAL IMPROVEMENTS ON-CALL CONTRACT 2022.
WHEREAS, on November 4, the City Council approved resolution no. 2020 -141, awarding t he City of Marina Municipal Improvements On -Call Contract to Don Chapin Company of Salinas, California, and;
WHEREAS, on November 18, 2020, the City entered into an agreement with Don Chapins for on - call municipal improvements for an annual contract amount not to exceed $1,000,000, and an option for an additional one (1) year extension with a not to exceed annual funding limit of $1,000,000, and;
WHEREAS, on March 9, 2022, the City executed amendment no. 1 to extend the agreement with Don Chapin for on-call municipal improvements until November 18, 2022, and;
WHEREAS, on call contracts are utilized by agencies to respond to construction emergencies expeditiously and improve project delivery. Also, an on -call municipal improvements contract i s similar to a job order contract, which will augment the City staff, and provide a readily available work force to repair existing City’s infrastructure, conduct emergency repairs and new construction, as the City deems appropriate for roadways, storm drain systems and other related work. In general, the work consists of repairs, replacement, and construction of concrete and hot mix asphalt pavements, curbs, gutters, sid ewalks, sidewalk crossings, curb ramps, cross gutters, dikes, decomposed granite sidewa lks, retaining walls, lighting, brick surfacing, paver surfacing, interlocking pavers, catch basins, manholes, installation of pipes and miscellaneous associated work at such times and locations as required, and;
WHEREAS, having the on-call contract will help the City quickly respond to construction emergencies, and deliver urgent projects on time and possible cost savings. As the process of bidding and selecting the next contractor may take a few months the staff intends to start th e process so that when the existing agreement expires the City can immediately enter into a new agreement to prevent any gap for addressing any potential infrastructure improvement/maintenance needs, and;
WHEREAS, this call for bids does not have fiscal impact for the Ci ty. The contract with a successful bidder will be for a term of one (1) year with a not to exceed annual funding limit of $1,000,000. The agreement will include an option for an additional one (1) year extension with a not to exceed annual funding limit of $1, 000,000. The total term of this agreement will not exceed two (2) years. The amount of work to be requested during the one year or optional additional year contract period cannot be well defined at the outset. Work shall be issued through Work Orders , and;
WHEREAS, work orders issued under this contract will be funded through respective approved Capital Improvement Project funding. In the case of emergency repairs, staff will bring a budget appropriation recommendation to City Council for approval, and;
WHEREAS, the action of approving, advertising and call for bids for the City of Marina Municipal Improvements on Call Contract for repair of existing infrastructure or emergency repair is not a project as defined by the California Environmental Quality Act (CEQA), and;
3 Resolution No. 2022-
Page Two
NOW THEREFORE, BE IT RESOLVED that the City Council of the City of Marina does hereby approve advertising and ca ll for bids for the Cit y of Marina Municipal Imp rovements On -Call Contract 2022.
PASSED AND ADOPTED, at a regular meeting of the City Council of the City of Marina, duly held on the 6th day of October 2022, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
__________________________
Bruce C. Delgado, Mayor
ATTEST:
_______________________
Anita Sharp, Deputy City Clerk
4 September 28, 2022 Item No. 8g(1)
Honorable Mayor and Members City Council Meeting
of the Marina City Council October 6, 2022
CITY COUNCIL TO CONSIDER ADOPTING RESOLUTION NO. 2022 -,
AWARDING A CONSTRUCTION CONTRACT FOR THE CALIFORNIA
AVENUE PED ESTRIAN C ROSSING INSTALLATION PROJECT TO
MONTEREY PENINSULA ENGINEERING, OF MARINA CA. FOR THE
TOTAL BID IN THE AMOUNT OF $404,148.00; ALLOCATING AND
APPROPRIATING ADDITIONAL FUNDING IN THE AMOUNT OF
$120,000; AND AUTHORIZING THE CITY MANAGER TO EXECUTE
CONTRACT D OCUMENTS SUBJECT TO FINAL REVIEW AND
APPROVAL BY THE CITY ATTORNEY; AND AUTHORIZING THE CITY MANAGER OR DESIGNEE TO EXPEND UP TO AN ADDITIONAL 10%
OF THE CONTRACT AMOUNT FOR CONSTRUCTION
CONTINGENCIES AND TO EXECUTE ALL CONSTRUCTION CHANGE
ORDERS ON BEHALF OF THE CITY; AND AUTHORIZING THE
FINANCE DIRECTOR TO MAKE NECESSARY ACCOUNTING AND
BUGETARY ENTRIES.
RECOMMENDATION:
It is requested that the City Council consider approving and adopting Resolution 202 2- for the following actions:
1. Awarding a construction contract for the California Avenue Pedestrian Crossing Installation Project to Monterey Peninsula Engineering of Marina, CA for the total bid in the amount of $404,148.00; and
2. Allocating and appropriating additional funding in the amount of $120,000 from the Public Facilities Impact Fee Intersection Fund to project HSR2005 for a total project funding of $565,000; and
3. Authorizing the City Manager to execute contract documents , EXHIBIT A, subject to final review and approval by the City Attorney; and
4. Authorizing the City Manager or his designee to expend up to an additi onal 10% of the contract amount for potential construction contingencies and to execute all construction change orders on behalf of the City; and
5. Authorizing the Finance Director to make necessary accounting and budgetary entries.
BACKGROUND:
On May 21, 2019, the City Council adopted Resolution No. 2019-54 receiving and approving the 2019 -2021 Capital Improvement Program (CIP). Included in the lis t of 2019 -2021 CIP projects is the California Avenue Pedestrian Crossing Installation project.
The California Avenue Pe destrian Crossing Installation project is identified as a safety improvement due to the Sea Haven Development to allow pedestrian access to the walkway on the west side of California Avenue. This projec t is identi fied in the Seaside & Marina Safe Walking & Biking to School Plan.
1 On November 16, 2021 , the City Council passed Resolution No. 2 021-119 receiv ing and approving final budget document for Fiscal Year (FY) 2021-22 and FY 2022-23. FY 2021-22 includes appropriation of $370,000 for additional funding for this project.
Staff issued a n on -call service order for the Wallace Group to design an d prepare bidding documents (plans, specifications, and estimates) for the proposed pedestrian crossing . After evaluation of the site, a Pedestrian Hybrid Beacon (PHB) was recommended due to vehicular volume and speed limit along California Avenue.
This project includes installation of a crosswalk and two new ADA compliant curb ramp s on the south side of the intersection with a PHB and associated electrical system. In addition, work will require conform curb, gutter, and sidewalk, asphalt concrete pavement ; pavement ma rkings and striping and associated miscellaneous work for a complete and operational pedestrian crossing in accordance with the project plans and specifications.
On August 16, 2022, the City Council passed Resolution No. 202 2-107 approving advertising and calling for bids for the California Avenue Pedestrian Crossing Installation Project. Per City Council’s direction the staff is coordinating with Marina Youth Arts for the utility box art and the estimated cost is $1,100 which will be included in the project budget.
ANALYSIS:
On September 27, 2022, six (6) sealed bids were received, opened, and wer e publicly read via live video feed for the project.
Following is the tabulation of bids received:
Name of Company and Address Total Bid
Monterey Peninsula Engineering (MPE)
Marina, CA
$ 404,148.00
Precision Grade Inc.
Salinas, CA
$ 452,997.60
Anderson Pacific Engineering
Santa Clara, CA
$ 463,856.00
St. Francis Electric, LLC
San Leandro, CA
$ 475,478.00
Don Chapin Co.
Salinas, CA
$ 508,077.00
Granite Rock Company
San Jose, CA
$532,293.00
The Engineer’s Opinion of Probable Construction Cost for this project is $370,000.
FISCAL IMPACT:
Following is the estimated expenditure to execute the project to completion.
Estimated Expense Amount
Construction Contract $404,148.00
Construction Contingency Allowance (10%) $ 40,414.80 Construction Management and Inspection Allowance $ 40,414.80 Project Management, Surveys , Engineering & Misc.
Expenses
$ 78,318.34
Total Estimated Expenditure $ 563,296.00
2 This is an approved CIP project with funding amount of $ 75,000 (FY 2019-2021) and $370,000 (FY 2021-2022) for a total project funding of $445,000.
To award this construction contract, $120,000 is requested to be allocated and appropriated to the project accounts HSR2005. This fund allocation will come fro m the Public Facilities Impact Fee Intersection Fund which has a current balance of $1,400,000.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
The City Planning Division determined that this action, awarding a construction contract a nd executing the Project to be Categorically Exempt under CEQA Guidelines per Article 19, Section 15304, Minor Alterations to Land.
CONCLUSION:
This request is submitted for City Council consideration and possible action.
Respectfully submitted,
Elvie Morla-Camacho, P.E., QSD/P
Project Management Services
Wallace Group
REVIEWED/CONCUR:
Brian McMinn, P.E., P.L.S.
Public Works Director/City Engineer
City of Marina
Layne P. Long
City Manager
City of Marina
3 RESOLUTION NO. 2022-
A RESOLUTION O F THE C ITY COUNCIL OF THE CITY OF MARINA
AWARDING A CONSTRUCTION CONTRACT FOR THE CALIFORNIA
AVENUE PEDESTRIAN CROSSING INSTALLATION PROJECT TO
MONTEREY PENINSULA ENGINEERING, OF MARINA CA. FOR THE
TOTAL BID IN THE AMOUNT OF $404,148.00; ALLOCATING AND
APPROPRIATING ADDITIONAL FUNDING IN THE AMOU NT OF $120,000;
AND AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT
DOCUMENTS SUBJECT TO FINAL REVIEW AND APPROVAL BY THE
CITY ATTORNEY; AND AUTHORIZING THE CITY MANAGER OR
DESIGNEE TO EXPEND UP TO AN ADDITIONAL 10% OF THE CONTRACT
AMOUNT FOR CONSTRUCTI ON CONTINGENCIES AND TO EXECUTE
ALL CONSTRUCTION CHANGE ORDERS ON BEHALF OF THE CITY; AND
AUTHORIZING THE FINANCE DIRECTOR TO MAKE NECESSARY
ACCOUNTING AND BUGETARY ENTRIES
WHEREAS, on May 21 , 2019, the Marina City Counc il adopted Resolution No. 2019-54 receiving and approving the 2019-2021 Capital Impro vement Program (CIP). Included in th e list of 2019-2021 CIP projects is the California Avenue Pedestrian Crossing Installation project; and
WHEREAS, the California Avenue Pedestrian Crossing Installation project is identified as a safety requirement due t o the Sea Haven Devel opment to allow pedestrian to access the walkway on the west side of California Avenue. This project is identified in the Seaside & Marina Safe Walking & Biking to School; and
WHEREAS, on November 16, 2021 , the City Council passed Resolution No. 2021 -119 receiving and approving final budget document for Fiscal Year (FY) 2021-22 and FY 2022-23.
FY 2021-22 includes appropriation of $370,000 for additional funding for this project; and
WHEREAS, staff issued an on -call service order for Wallace Group to design and prepare bidding documents (plans, specifications, and estimates) for the proposed pedestrian crossing.
After evaluation of the site, a Pedestrian Hybrid Beacon (PHB) was recommended due to vehicular volume and speed limit along California Avenue; and
WHEREAS, this project includes installation of a crosswalk and two new ADA compl iant curb ramps on the southwest side of the intersection with a PHB and associated electrical system. In addition, work will require conform curb, gutter, and sidewalk , asphalt concrete pavement ; pavement ma rking and striping and associated miscellaneous work for a complete and operational pedestrian crossing in accordance with the project plans and specifications; and
WHEREAS, on August 16, 2022, the City Council passed Resolution N o. 2022-107 approving advertising and call ing for bids for the California Avenue Pedestrian Crossing In stallation Project; and
WHEREAS, this is an a pproved CIP project with funding amount of $ 75,000 ( FY 2019-2021) and $370,000 (FY 2021-2022) for a total project funding of $445,000; and
WHEREAS, the City Planning Division determined that this action, awarding a construction contract a nd e xecuting the Project to be Categorically Exempt under CEQA Guidelines per Article 19, Section 15304, Minor Alterations to Land; and 4 Resolution No. 2022-
Page Two
NOW THEREFORE, BE IT RESOLVED that the City Council of the City of Marina do es hereby:
1. Award a construct ion contract fo r the California Avenue Pedestrian Crossing Installation Project to Monterey Peninsula Engineering of Marina, CA for the total bid in the amount of $404,148.00; and
2. Allocate and appropriate additional funding in the amount of $120,000 from the Public Facilities Impact Fee Intersection Fund to project HSR2005 for a total project funding of $565,000; and
3. Authorize the City Manager to execute contract documents , Exhibit A, subject to final review and approval by the City Attorney; and
4. Authorize the City Manager or his designee to expend up to an additi onal 10% of the contract amount for potential construction contingencies and to execute all construction change orders on behalf of the City; and
5. Authorize the Finance Director to make necessary accounting and budgetary entries.
PASSED AND ADOPTED, at a regular meeting of the City Council of the City of Marina, duly held on the 6th day of October 2022, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
Bruce C. Delgado, Mayor
ATTEST:
Anita Sharp, Deputy City Clerk
5 City of Marina California Avenue Pedestrian Crossing Installation A9 FORM OF CONTRACT
1 A9 FORM OF CONTRACT
FOR
City of Marina California Avenue Pedestrian Crossing Installation THIS AGREEMENT, made and entered into this ___________________ 2022, by and between The City of Marina, a municipal corporation of the State of California, hereinafter called "City of Marina” or “City” and Monterey Peninsula Engineering "Contractor," W I T N E S S E T H:
FIRST: Contractor hereby covenants and agrees to furnish and provide all labor, materials, tools, appliances, equipment, plant and transportation, and all other things required or necessary to be furnished, provided or done, and build, erect, construct and complete the work at the time and in the manner provided, and in strict accordance with the plans and specifications therefore, for PROJECT adopted by the Council of the City of Marina on October 6, 2022.
SECOND: It is expressly understood and agreed that this contract consists of the following documents, all of which are incorporated into this agreement and made a part hereof as fully and completely as if set forth herein verbatim, to wit:
a. Accepted Proposal;
b. Proposal Guaranty Bond;
c. Contract Agreement;
d. Performance Bond;
e. Bond for Labor and Material;
f. Proposal Supplement Including an Experience Statement and List of Proposed Subcontractors; g. These Specifications;
h. The California State Standard Specifications and Standard Details 2018; and i. Insurance.
THIRD: That said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work embraced and contemplated in this Agreement and as set forth in the Proposal adopted by the City of Marina, a true copy thereof hereto attached, also, for all loss or damage arising out of the nature of said work, or from the action of the elements or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until the acceptance thereof by the City of Marina and for all risk connected with the work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the said Plans and Specifications and the provisions of this Agreement, and the requirements of the Engineer under them, to wit: The prices as set forth in the Proposal of said Contractor for the work to be constructed and completed under this Agreement, which prices shall be considered as though repeated herein.
FOUR HUNDRED FOUR THOUSAND ONE HUNDRED FORTY-EIGHT DOLLARS ( $ 404,148.00 )
EXHIBIT A
6 City of Marina California Avenue Pedestrian Crossing Installation A9 FORM OF CONTRACT
2 The undersigned Contractor further agrees to so plan the work and to prosecute it with such diligence that said work, and all of it, shall be completed on or before the expiration of the time specified in the Special Provisions after execution of the contract on behalf of the City of Marina and the receipt from the City of Marina of a notice to proceed with the work.
FOURTH:The City of Marina hereby promises and agrees with said Contractor to employ, and does hereby employ, said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner and upon the conditions set forth in the Specifications; and the said parties, for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained.
FIFTH: No interest in this agreement shall be transferred by the Contractor to any other party, and any such transfer shall cause the annulment of this contract, so far as the City of Marina is concerned. All rights of action, however, for any breach of this contract are reserved to City.
SIXTH: Contractor shall keep harmless and indemnify the City of Marina, its officers and employees and agents, from all loss, damage, cost or expense that arises or is set up for infringement of patent rights of anyone for use by the City of Marina, its officers, employees or agents, of articles supplied by the Contractor under this contract, of which he is not entitled to use or sell. Contractor agrees to, at his own cost and expense, defend in court the City, its officers, agents and employees, in any action which may be commenced or maintained against them or any of them, on account of any claimed infringement of patent rights, arising out of this agreement.
SEVENTH: The Contractor agrees to immediately repair and replace all defective material and workmanship discovered within one year after acceptance of final payment by Contractor and to indemnify said City of Marina against all loss and damage occasioned by any such defect, discovered within said year, even though the damage or loss may not be ascertained until after the expiration thereof. Provided, however, that if such failure of the Contractor to perform should not, by reasonable diligence, be discoverable or discovered within said one year, then the obligation of the Contractor to repair and replace said defective material or workmanship shall continue until one year after the actual discovery thereof.
EIGHTH: The Contractor agrees at all times during the progress of the work to carry with insurance carriers approved by the City of Marina full coverage workmen's compensation and public liability insurance in the form and to the extent called for in Section 7-1.06 of the Standard Specifications, State of California, 2018 Edition. Such insurance policy shall contain an endorsement that the same shall not be canceled nor the amount of coverage be reduced until at least 30 days after receipt by the City of Marina by certified or registered mail of a written notice of such cancellation or reduction in coverage.
NINTH: Contractor agrees to comply with all applicable federal, state and municipal laws and regulations, including but not limited to California Labor Code Division 2, Part 7, Chapter 1 regarding Public Works and Public Agencies.
TENTH:
ATTORNEY’S FEES. In the event of any controversy, claim or dispute relating to this Agreement or the breach thereof, the prevailing party shall be entitled to recover from the losing party reasonable expenses, attorney’s fees and costs.
EXHIBIT A
7 City of Marina California Avenue Pedestrian Crossing Installation A9 FORM OF CONTRACT
3 ELEVENTH:
COMPLIANCE WITH PROVISIONS OF LAW.
a) The City is subject to laws relating to public agencies which are part of this contract as though fully set forth herein.
b) Contractor shall comply with City of Marina Municipal Code Chapter 13.02 Local Hiring for Public Works.
c) Contractor shall comply with laws relating to the work.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date first above written.
CONTRACTOR CITY OF MARINA
By: ____________________________ By: Layne P. Long, City Manager Print Name: _____________________ Date: _______________________
Address: _______________________
_______________________
Date: __________________________
APPROVED AS TO FROM:
By: ____________________________
Heidi Quinn, Interim City Attorney
By: _________________________
Date: __________________________ Date: _______________________ ATTESTED:
By: ____________________________
Anita Shepherd-Sharp
Deputy City Clerk
Date: __________________________ Resolution No. 2022-_____
EXHIBIT A
8 September 30, 2022 Item No. 9a
Honorable Mayor and Members City Council Meeting
of the Marina City Council of October 6, 2022
RECOMMENDATION TO OPEN A PUBLIC HEARING, TAKE ANY
TESTIMONY FROM THE PUBLIC, AND CONSIDER ADOPTING
RESOLUTION NO. 2022 - , DETERMINING THAT THE PROPOSED
AMENDMENT TO THE UNIVERSITY VILLAGES (NOW THE DUNES
ON MONTEREY BAY) TENTATIVE SUBDIVISION MAP
(RESOLUTION NO. 2008 -209) IS CONSISTENT WITH CERTIFIED EIR (SCH NO. 2004091167) AND ADOPTED UNIVERSITY VILLAGES
SPECIFIC PLAN, APPR OVING AN AMENDMENT TO THE
TENTATIVE SUBDIVISION MAP APPROVED IN 2005 (RESOLUTION
NO. 2005 -131), SUBJECT TO FINDINGS AND CONDITIONS OF
APPROVAL,
RECOMMENDATION:
It is recommended that City Council consider:
1. Opening a Public Hearing, taking any testimony from the public;
2. Determine the Tentative Subdivision Map amendment as proposed is consistent with the certified EIR (SCH No. 2004091167) and adopted University Villages Specific Plan; and
3. Approve an amendment to the Tentative Subdivision Map or iginally approved in 2005 (Resolution 2005-131).
BACKGROUND:
At the regular meeting of May 31, 2005, City Council adopted Resolution No. 2005 -127, certifying the Environmental Impact Report for the University Village Development Project, Resolution No. 2005 -130, approving the University Village Specific Plan, Resolution No. 2005- 131, approving the University Village Tentative Map and Resolution No. 2005 -132, approving Sign Program for Regional Retail, Village promenade, Site Plans, Landsc aping Plans, Lighting Plans and Building Elevations for Residential Units.
Also in 2005, the City entered into a Development Agreement with Marina Community Partners, LLC (MCP) for the University Villages project. The agreement states that, “As a result of the execution of this Agreement, both Parties can be assured that the Project can proceed without disruption caused by a change in City planning and development policies and requirements, which assurance will thereby reduce the actual or perceived risk of planning, financing and proceeding with construction of the Project and promote the achievement of the private and public objectives of the Project.”
On October 2, 2007, the City Council adopted Resolution No. 2007 -229, approving Phase 1C Final Map for The Dunes Development Project Subd ivision (formerly University Village) and approving Subdivision Improvement Agreement between City of Marina and Marina Community Partners, LLC, (MCP). This Map and Subdivision Improvement Agreement were never executed and recorded with the Monterey County Recorder’s office.
1 On October 21, 2008, the City Council adopted Resolution No. 2008 -209, certifying an addendum to the Environmental Impact Report EIR SCH No. 2004091167, approving an amended tentative map and conditions of approval, revised site plan fo r the Dunes Phase 1B and revised Project and Tenant Sign Criteria, subject to conditions.
On May 19, 2020, the City Council adopted Resolution No. 2020-53 amending the previously approved tentative map determining that the changes to the project are not substantial, that the changes do not involve any new significant effects or a substantial increase in the severity of the significant effects previously identified in the certified EIR.
ANALYSIS:
MCP pr oposes further amendments to the Tentative Subdivisi on Map initially approved in 2005 and last amended in 2020. The Tentative map amendments correspond to the Phase 2 area west of 2nd Street and Phase 3, not including Opportunity Phases, illustrated below.
The Specific Plan (Section 5.6) allows for a certain amount of flexibility in response to shifts in market demand determined at the administrative level by the University Villages (Dunes) project manager, or Community Development Director. Municipal Ordinance Chapter 16.08 (Tentative Maps) requires City Council action to approve subdivision maps.
2 Phase 2 West Tentative Map Amendments
The Tentative Map amendment approved in May 2020 delineated 88 resid ential lots shown directly below. The proposed amendment to Phase 2 reduces number of residential lots has been reduced from 88 to 68 with Open Space (O S-2.12) located north of the 8th Street alignment west of the linear park.
3 Phase 3 Tentative Map
The Tentative Map amendment approved in May 2020 delineated Lot 20 designated as FUTURE PHASE 3. The proposed Tentative Subdivision Map amendment delineates 255 residential lots for single family and two -family dwelling units , and open space parcels that total 2.48 acres, including Butterfly Park . Policy 2.12 of the Marina General Plan states, “To meet the needs of existing and future Marina residents and persons employed within the City, outdoor park and recreation space shall be provided consistent with the standards of Table
2.2.”
Table 2.2 (Park and Recreation Standards) requires 0.2 acres of sub-neighborhood park described as, “small -scale passive and active area for informal play and relaxation close to the place of residence,” per approximately 40 housing units. This space may be public or private, may be common open space available only to residents of a specific project, or public and open to all residents within 660 feet of units served.
4 Based on the Park and Recreation Standard of the General Plan, 1.275 acres of sub - neighborhood area is required. It would appear sufficient acreage i s provided and is located within the required proximity. What is not known is how the area will be improved to create small-scale passive and active areas for informal play and relaxation close to residences.
Improvement Plans show stormwater retention fac ilities in most open space areas, and in nearly all of the (Butterfly) park. Such sub -surface improvements may limit the types of amenities that can be installed. Since no appeal was filed of the Commission ’s actions, per the City’s Municipal Code this is the final action on the tree removal permit.
Planning Commission Public Hearing
On September 8, 2022 , the Marina Planning Commission considered the proposed amendments to Tree Removal Permits and amendments to the Tentative Subdivision Map amendment approved in 2020. During public comment, Mike Owen addressed the MCP proposal to retain additional trees on site in Phase 3. It was Mr. Owen’s position that one of the trees to be retained had no redeeming value and should be removed. Following the clos e of public hearing, the Planning Commission considered Mr. Owen’s opinion , voted unanimously to approve amendments to the Tree Removal permits for Phase 2 West and Phase 3 as summarized belo w, and voted unanimously to recommend the City Council determine that the Tentative Subdivision Map amendment as proposed is consistent with the certified EIR (SCH No. 2004091167) and adopted University Villages Specific Plan and approve an amendment to th e Tentative Subdivision Map originally approved in 2005 (Resolution 2005 -131). Staff has since confirmed that the tree Mr. Owen had addressed (Tree #888) is to be removed.
Tree Removal and Replacement Summary
Phase 2 West
Phase 3
Residential
Total Trees
(Phases 2W &
3)
Healthy Trees to be Removed
Per Initial Permit Amendment
39 327 366
Healthy Trees to be Replaced
At a Ratio of 2:1
39 @ 2:1 =
78 327 @ 2:1 =
654 732
Less Healthy Trees Now
to be Retained
39 – 8 = 31 327 – 28 = 299 366 – 36 =
330
Healthy Trees to be Replaced
At a Ratio of 2:1
31 @ 2:1=
62 299 @ 2:1 =
598 660
Healthy Trees Removed
Without Permit
- 7 @ 6:1 =
42 42
Total Number of Replacement Trees
62 640 702
5 Procedural Requirements
On October 9, 2019, Governor Newsom signed Senate Bill 330 and in doing so declared a statewide housing emergency to be in effect until January 1, 2025. The intent is to streamline the development of housing projects and to further limit the ability of loc al agencies to deny housing projects. SB 330 further clarifies the Permit Streamlining Act by shortening permit review t imeframes and limiting public hearings. This bill prohibits a city or county from conducting more than five (5) hearings, as defined, he ld pursuant to these provisions, or any other law, ordinance, or regulation requiring a public hearing, if a proposed ho using development project complies with the applicable, objective general plan and zoning standards in effect at the time an application is deemed complete, as defined.
The City Council has participated in two duly noticed public meetings: a study sessio n on May 10, 2022 , and a site inspection on June 1, 2022. In order to ensure that the City Council has the opportunity to conduct additional two public hearings on this matter, Staff encouraged the Planning Commission to conclude its deliberations on this m atter and make its recommendation to City Council on September 8, 2022, which was accomplished. Additionally, per the Marina Municipal Code, the Planning Commission was the final legislative b ody to review the tree removal permit. No appeal was filed and therefore the action of the Commission on September 8, 2022, is the final decision of the City of Marina on this portion of the project.
FISCAL IMPACT:
None
CONCLUSION:
This request is submitted for City Council consideration and recommended action.
Respectfully submitted,
Guido Persicone, AICP
Community Development Director
City of Marina
REVIEWED/CONCUR:
Layne Long
City Manager
City of Marina
Attachments:
1. Draft Project Conditions of Approval
2. Amended Tentative Maps for Phases 2 West and Phase 3
6 RESOLUTION NO. 2022-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA APPROVING AN
AMENDMENT TO THE UNIVERSITY VILLAGES (NOW THE DUNES ON MONTEREY BAY) TENTATIVE SUBDIVISION MAP (RESOLUTION NO. 2008-209), AND DETERMINING THAT THE AMENDMENT IS CONSISTENT WITH THE CERTIFIED EIR (SCH No. 2004091167)
AND UNIVERSITY VILLAGES SPECIFIC PLAN
WHEREAS, at the regular meeting of May 31, 2005, City Council adopted Resolution No. 2005 - 127, certifying the Environmental Impact Report for the University Village s Development Project, Resolution No. 2005-130, approving the University Villages Specific Plan, Resolution No. 2005-131, approving the University Village s Tentative Map and Resolution No. 2005 -132, approving Sign Program for Regional Retail, Village promenade, Site Plans, Landscaping Plans, Lighting Plans and Building Elevations for Residential Units; and
WHEREAS, at the regular m eeting of October 2, 2007, the City Council adopted Resolution No. 2007-229, approving Phase 1C Final Map for The Dunes Development Project Subdivision (formerly University Village) and approving Subdivision Improvement Agreement between City of Marina and Marina Community Partners, LLC, (MCP). This Map and Subdivision Improvement Agreement were never executed and recorded with the Monterey County Recorder’s office; and
WHEREAS, at the regular meeting of October 21, 2008, the City Council adopted Resolution No. 2008-209, certifying an addendum to the Environmental Impact Report EIR SCH No. 2004091167, approving an amended tentative map and conditions of approval, revised site plan for the Dunes Phase 1B and revised Project and Tenant Sign Criteria, subject to conditions; and
WHEREAS, at the regular meeting of December 17, 2019, the City Council adopted Resolution No. 2019-140 approving an Operating Agreement for the Dunes on Monterey Bay, including but not limited to, the Specific Plan, Development Agreement, the Schedule of Performance, and the 2019 project pro formas; and,
WHEREAS, Marina Community Partners (MCP) proposed amendments to the previously approved Tentative Map for Phase 3 residential area of the Dunes on Monterey Bay; and
WHEREAS, the modifications proposed and the circumstances under which the modifications would be carried out do not require substantial changes to the previous EIR due to the involvement of new significant environmental impacts or a substantial increase in the sev erity of previously identified significant effects. In addition, there is no new information of substantial importance that would require a subsequent EIR, Supplemental EIR or Negative Declaration/Mitigated Negative Declaration in accordance with Section 1 5162(a)(3) of the California Environmental Quality Act and “The Rules to Implement the California Environmental Quality Act of 1970”.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Marina does hereby:
1. Determine the Tentative Subdivision Map amendment as proposed is consistent with the certified EIR (SCH No. 2004091167) and adopted University Villages Specific Plan;
2. Approve an amendment to the Tentative Subdivision Map originally approved in 20 05 (Resolution 2005-131), amending residential lots, open space and roadways in Phase 2 West, and creating 255 residential lots, open space and roadways in Phase 3 Residential; and
7 Resolution No. 2022
Page Two
PASSED AND ADOPTED by the City Council of the City of Marina at a regular meeting held on the 6th day of October 2022, by the following vote:
AYES, COUNCIL MEMBERS:
NOES, COUNCIL MEMBERS:
ABSENT, COUNCIL MEMBERS:
ABSTAIN, COUNCIL MEMBERS:
Bruce Delgado, Mayor
ATTEST:
Anita Sharp, Deputy City Clerk
8 UNIVERSITY VILLAGES
AMENDED TENTATIVE SUBDIVISION MAP
CONDITIONS OF APPROVAL
General Conditions
1. All final maps filed pursuant to this approval shall, in the opinion of the City, be in substantial compliance with the referenced Tentative Map on file in the offices of the City of Marina.
2. The University Villages Specific Plan proposes numerous areas that will be held in common ownership amongst all property owners. The Specific Plan proposes both a Lighting and Landscaping District (LLD) and a Homeowners Association (HOA) to maintain and manage the common areas. As part of any Final Map application, the Applicant shall submit HOA By-Laws, and Conditions, Covenants & Restrictions (CC&R's) establishing the HOA and defining its maintenance responsibilities, for review and approval by the City Attorney or his/her designee prior to the approval of the Final Map. The CC&R's shall contain provisions for the management and maintenance by a Homeowners Association of all lanes and internal streets and pedestrian way landscaping. All other common areas, including parks and open space, medians and parkways, storm drains and street lighting, shall be maintained by a Community Facilities District (CFD) in lieu of an LLD. Said CFD shall be established prior the City being obligated to accept any easement or right-of-way and prior to the City's acceptance of public infrastructure improvements.
3. Prior to approval of the first Final Map, the developer shall execute a subdivision improvement agreement and bond for all public improvements. The subdivision improvement agreement will provide that the City shall not be obligated to accept any easement or right-of-way and shall not accept public infrastructure improvements prior to the establishment of the CFD required by Condition herein.
4. The developer shall pay all required Development Impact Fees in accordance with the approved Development Agreement.
5. The developer shall provide proof of payment to outside utility providers of all required service and connection fees in accordance with the Development Agreement.
6. Prior to the issuance of any Grading or Building Permit, the applicant shall submit for staff review and approval a Construction Dust Control Plan in accordance the approved EIR Mitigation Monitoring Program for dust control.
7. Prior to issuance of a Grading Permit, offsite grading and/or encroachment permits shall be obtained from any affected agencies or parties.
8. Prior to approval of a Final Map the Applicant shall comply with the requirements of Government Code section 66473.7.
ATTACHMENT 1
9 Geologic Report
9. Prior to approval of any Final Map, Parcel Map or Grading Plan, the developer shall submit a geotechnical report that addresses soil and foundation requirements and considers any prior grading on the site and addresses conditions as they will exist at the time of building and infrastructure construction. Improvement and Grading Plans shall comply with all recommendations, conditions and conclusions contained in the report. The Geotechnical Consultant shall review all fieldwork, including but not limited to, excavation, placing and compacting of fill, trenching and backfill, and paving.
10. The Geotechnical Engineer of record for this project shall be responsible for the evaluation of conditions. If retaining walls are greater than 6' in height the Geotechnical Engineer of record shall be responsible for the evaluation of all slope gradients on the Rough Grading Plan, and/or the Grading plan to confirm the slopes are appropriately designed.
Improvement Plans
11. Prior to recordation of any Final Map or Parcel Map, improvement plans shall be submitted for any and all public and private infrastructure improvements required to be constructed in accordance with the approved Tentative or Tentative Parcel Map for the subdivision. Said improvement plans shall be submitted to the City Engineer or his/her designee for approval and shall show all infrastructure necessary to serve that subdivision, including but not limited to grading, streets, storm drainage, sanitary sewer, potable water, reclaimed water, landscaping, streetlights, electricity, telephone, cable television, traffic signals, signing and striping, erosion and sedimentation control facilities. Final improvement plans shall be accompanied by electronic files for use in updating City base maps.
12. New streetlights shall be required on all streets as part of the public improvements. The final design of streetlights shall be subject to approval of the City Engineer and shall be designed in conformance with the Specific Plan. Additionally, security lights shall be installed at neighborhood parks, open spaces and along trails and bike paths. The Applicant shall submit lighting plans including photometric calculations as part of the public improvement plans for review and approval by the City Engineer of his/her designee. New streetlights will be owned, maintained and repaired by the LLD / CFD.
13. The design of Improvement Plans specific to existing and proposed tree locations shall be coordinated with the landscape architect and engineer.
Engineering/Public Works
14. The Applicant shall dedicate land as necessary to construct any public improvements.
15. All retaining walls holding a surcharge shall be submitted and reviewed through a Building Permit.
ATTACHMENT 1
10 16. All homes fronting 1st Avenue shall relinquish abutters rights due to excessive grades preventing driveway access to 1st Avenue.
17. Prior to approval of the first Final Map, the applicant shall submit a program for the timing scheduling of the street, bike path and lane improvements.
18. The Developer shall improve and dedicate to the City the linear park along the future General Stillwell Avenue (to be renamed), consistent with the concept set forth in the Specific Plan.
19. Grading along the linear park shall not exceed a cross-slope of 5% to allow the trail system and amenities to be constructed without constraints.
20. All public and/or private walkways shall be designed, installed and maintained in compliance with ADA standards.
Storm Water
21. Prior to approval of Improvement Plans, a Storm Drainage Report and Plan that is consistent with the drainage concepts included in the University Villages Specific Plan shall be submitted for review and approval. The Plan shall include drainage calculations, drainage plans, and landscaping plans for permanent proposed retention basins (if any), and a program for ongoing maintenance of storm drain facilities by the LLD/ CFD to be formed by the Applicant.
22. Prior to the issuance of a Grading Permit, appropriate best management practices shall be identified and approved by the City Engineer or by his/her designee to minimize the impacts of storm water runoff during construction.
23. Stormwater retention systems shall be constructed/installed to allow proposed improvements (e.g., Trees, Play Structures, Public Amenities) to be constructed on top of such systems.
Sanitary Sewer
24. Prior to recordation of any Final Map, the applicant shall submit verification from the Monterey Regional Water Pollution Control Agency to the City of Marina that adequate wastewater treatment capacity exists to serve the University Villages project.
25. Prior to recordation of any Final Map, the applicant shall execute as necessary a Construction and Transfer of Water, Recycled Water, and Sewer Agreements with the Marina Coast Water District MCWD) and the City of Marina Public Works Department.
Dry Utilities (Electric, Cable, and Telephone)
ATTACHMENT 1
11 26. Unless equipment is required to be above ground, all utilities shall be placed underground as approved by the City Engineer or by his/her designee. Any equipment above ground shall be screened with landscaping as required by the City Engineer or by his/her designee.
Public Safety
27. Fire lanes shall be provided and designated at strategic locations throughout the development for access to greenbelt and open space areas as required by the Fire Chief and Public Safety Department Director.
28. Prior to issuance of a Grading Permit, the applicant shall gain approval from the Fire Chief for the appropriate fire access and fire hydrant(s).
29. Prior to construction, appropriate fire hydrant locations and fire access shall be in place and operational as required by the Fire Chief for the specific building location.
30. Prior to approval of Improvement Plans, the plans shall show one wireless 802.11b streetlight standard mounted transmitter/repeater for every two hundred residences at locations subject to review and approval by the Fire Chief.
31. Driveway entrances, emergency access improvements and parking lot radius within the development shall be designed to the satisfaction of the Marina Fire Department.
Building
32. Prior to issuance of a Building Permit, building pads shall be certified by a licensed civil engineer or land surveyor for elevation and by a licensed geotechnical engineer for compaction.
City Attorney
33. The Applicant shall agree as a condition of approval of this project to defend, at its sole expense, indemnify and hold harmless from any liability the City and reimburse the City for any expenses incurred resulting from, or in connection with, the approval of the project, including any appeal, claim, suit or legal proceeding. The City may, at its sole discretion, participate in the defense of any such action, but such participation shall not relieve the applicant of its obligations under this condition. As a further condition of approval, the Applicant shall agree that in the event the City initiates any legal action or suit to enforce any condition of approval contained herein, the prevailing party shall be entitled to recover from the losing party reasonable expenses including attorney fees, court costs, and administrative costs including but not limited to staff time and consultants’ fees. Within 21 days of the Council's action on the subject permits and approvals the Applicant shall have prepared and submitted an agreement incorporating the above terms acceptable to the City Attorney.
ATTACHMENT 1
12 34. Any tree removal within the revised Tentative Map area shall be subject to conditions of approval established by the Planning Commission’s approval of a Tree Removal Permit on September 8, 2022
ATTACHMENT 1
13 PARCEL OS-2.13
0.6 AC
LANE 3 (20' R/W)
D STREET
E STREET
C STREET
B STREET
7TH STREET
6TH STREET
7TH STREET
6TH STREET
D STREET
E STREET
1ST AVENUE
2ND AVENUE
9TH STREET
2ND AVENUE
PARCEL OS-2.14
1.0 AC
FUTURE PHASE 3
A STREET
(8TH STREET)
PARCEL OS-2.12
0.81 AC
(SEE NOTE 5)
LANE 2 (20' R/W)
LANE 1 (30' R/W)
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
EI
3140.18
L-1
1 SUBSTANTIAL COMPLIANCE EXHIBIT
UNIVERSITY VILLAGES - PHASE 2 WEST
LOTS & PARCELS
MARINA, CALIFORNIA
11/18/2020
APH
CITY SUBMITTAL
3/2/2021
APH
CITY COMMENTS
2/22/2022
APH
LOTTING REVISION
PARCEL SUMMARY
SINGLE FAMILY LOTS
PARCEL ACREAGEUSE
LOTS 552-6236.96
CITY PARKPARCEL OS-2.141.04
PARCEL OS-2.120.81
0.65 STREET RIGHT-OF-WAY ALL STREETS8.71
LANE RIGHT-OF-WAYLANE 1 - LANE 30.33
TOTAL TENTATIVE MAP ACREAGE18.50
OFF-SITE RIGHT-OF-WAY 6TH & 7TH AVE1.89
PARCEL OS-2.13
OPEN SPACE
1.46 SUB-TOTAL
PROJECT DESCRIPTION
DUET (37'x65')
LOTSQUANTITY TYPE
LOTS 564 - 58320
SMALL LOT STANDARD (50'x80')LOTS 552 - 557,
584 - 592, 602 - 61024
LOTS 558 - 563,
593 - 601, 611 - 619
TOTAL SINGLE FAMILY LOTS68
LARGE LOT (55'x90')24
SINGLE FAMILY LOT SUMMARY
PARCEL SUMMARY
LEGENDPROPOSEDEXISTING
355
NOTES:
ATTACHMENT 2
14 PHASE 1C
PHASE 1B
PHASE 3
RESIDENTIAL
OPPORTUNITY
PHASE 4
OPPORTUNITY
OPPORTUNITY
PHASE 2 EAST
PHASE 2 WEST
2ND AVE
HIGHWAY 1
IMJIN PARKWAY
PHASE 3OPPORTUNITY
BMR
SITE 2
9TH STREET
8TH STREET
CSUMB
CITY OF
MARINA
THE DUNES
CITY PARK
BMR
SITE 1
PHASE 1A
DIVARTY STREET
1ST AVE
CITY OF SEASIDE
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
AS NOTED
IPB
3140.22
C-1
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
TITLE SHEET
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
AMENDED TENTATIVE MAP
FOR
UNIVERSITY VILLAGES - PHASE 3
MARINA, CALIFORNIA
ABBREVIATIONS
PROJECT SHEET INDEX
PARCEL SUMMARYGENERAL NOTES
E
IN
E
S
O
N
W
EN
IT
H
S
G
R
IMJIN PARKWAY
INTER GARRISON ROAD
CAL
IFORN
IA
1 MARINA
LEGENDPROPOSEDEXISTING
355
SINGLE FAMILY LOTS
PARCEL ACREAGEUSE
LOTS 624-87426.41
STREET RIGHT-OF-WAY
LANE RIGHT-OF-WAY
TOTAL TENTATIVE MAP ACREAGE
OFF-SITE RIGHT-OF-WAY
OPEN SPACE/ACCESS
SUB-TOTAL
2ND AVE
GENERAL JIM MOORE BVLD
PROJECT DESCRIPTION
DUET (37'x65')
LOTSQUANTITY TYPE
89 SMALL LOT STANDARD (50'x80')
TOTAL SINGLE FAMILY LOTS
SMALL LOT STANDARD (55'x90')
SINGLE FAMILY LOT SUMMARY
PARCEL SUMMARY
VICINITY MAP
19.82 1.00
ALL STREETS
LANE 1 - LANE 6
620-630, 641-648, 661-689, 702-709,
721-735, 795-801, 844-849, 870-874
77 631-640, 649-660, 690-701, 710-720,
736-742, 788-794, 802-811, 841-843,
865-869
89 743-787, 812-840, 850-864
255
PARCEL OS-3.1
PARCEL OS-3.2
PARCEL OS-3.3
PARCEL OS-3.4
PARCEL OS-3.5
PARCEL OS-3.6
PARCEL OS-3.7
0.30 0.16
0.32 0.51
0.14 0.18
0.31 2.48
76.58 1ST AVENUE
3RD STREET
0.05 0.67
OPPORTUNITY PHASE 3
OPPORTUNITY PHASE 4
10.75 16.12
PARCEL OP-3.1-3.3
PARCEL OP-4.1-4.4
PARCEL OS-3.80.10
PARCEL OS-3.90.02
PARCEL OS-3.100.07
PARCEL OS-3.110.30
PARCEL OS-3.120.03
PARCEL OS-3.130.05
ATTACHMENT 2
15 SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
NONE
IPB
3140.22
C-2
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
DETAILS & SECTIONS
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
NEIGHBORHOOD STREET
NEIGHBORHOOD STREET WITH BIKE LANES
TYPICAL LANE SECTIONTYPICAL 4-WAY INTERSECTION DETAILTYPICAL T-INTERSECTION DETAIL 52' R/W
ONE-WAY LINEAR PARK
TYPICAL T-INTERSECTION DETAIL 62' R/W
LINEAR PARK CROSSING INTERSECTION DETAIL
ATTACHMENT 2
16 LINE & CURVE DATA
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 200'
IPB
3140.22
C-3
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
BOUNDARY MAP EXHIBIT
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
EI N E
S
ON
W
E
N
I T
H
S
G R
LEGEND
TENTATIVE MAP BOUNDARY
SPECIFIC PLAN BOUNDARY
COURSE #20
ATTACHMENT 2
17 NOT A PART
PARCEL
OP-4.3
5.67 AC
PARCEL
OP-4.4
4.80 AC
PARCEL
OP-4.1
2.14 AC
PARCEL
OP-3.1
3.93 AC
PARCEL OP-3.2
3.78 AC
PARCEL OS-3.1 (0.30 AC)PARCEL OS-3.3 (0.32 AC)
PARCEL
OS-3.5
0.14 AC
PARCEL
OS-3.6
0.18 AC
PARCEL
OS-3.7
0.31 AC
PARCEL OS-3.8
0.095 AC
PARCEL OS-3.10
0.07 AC
PARCEL OS-3.9
0.016 AC
PARCEL OS-3.11
0.30 AC
PARCEL OS-3.4
0.51 AC
NOT A PART
3RD STREET
1ST AVENUE
LANE 2
LANE 1
LANE 3
BMR SITE 2
APARTMENTS
2.35 AC
TAMC
TAMC
2ND AVENUE
1ST AVENUE
J STREET
2ND AVENUE 2ND AVENUE
FUTURE 3RD STREET
D STREET
E STREET
HIGHWAY 1
G STREET
H STREETF STREET
Q STREET
D STREET
E STREET
M STREET
P STREET
S STREET
N STREET
1ST AVENUE
7TH STREET
B STREET
C STREET
D STREET
E STREET
PHASE 2 OP
PARCEL OS-3.2 (0.16 AC)
5TH STREET
LANE 4
R STREET
O STREET
LANE 5
LANE 6
K STREET
L STREET
I STREET
J STREET
6TH STREET
7TH STREET6TH STREET
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640 641
642
643
644
645
646
647
648
649 650 651
652
653
654
655
656
657
658
659
660 661
662
663
664
665
666
667
668
669
670671 672673674
675 676 677 678 679
680
681
682
683
684
685
686
687
688
689690
691
692
693
694
695
696
697
698
699 700 701
702
703
704
705
706
707
708
709710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731732
733
734
735
736 737 738 739 740741 742
743
744
745746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768 769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788 789 790 791 792 793 794 795
796
797
798
799
800
801802
803
804
805
806
807 808 809 810 811
812 813 814 815 816
817 818 819 820 821
822 823 824 825 826
827 828 829 830 831
832 833 834 835 836 837 838 839 840
841
842
843 844
845
846
847
848
849850 851 852 853 854 855 856 857
858
859
860
861
862
863
864 865
866
867
868
869 870
871
872
873
874
PARCEL OS-3.12 (0.03 AC)
PCL OS-3.13 (0.05 AC)
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
IPB
3140.22
L-1
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
LOTS & PARCELS - NORTH
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SEE SHEET L-2
ATTACHMENT 2
18 NOT A PART
PARCEL OP-4.2
3.52 AC
PARCEL
OP-4.35.67 AC
PARCEL
OP-4.4
4.80 AC
PARCEL
OP-4.1
2.14 AC
PARCEL
OP-3.1
3.93 AC
PARCEL OP-3.2
3.78 AC
PARCEL OP-3.3
3.04 AC
PARCEL OS-3.3 (0.32 AC)
PARCEL
OS-3.7
0.31 AC
PARCEL OS-3.8
0.095 AC
PARCEL OS-3.10
0.07 AC
PARCEL OS-3.9
0.016 AC
NOT A PART
3RD STREET
1ST AVENUE
LANE 3
2ND AVENUE
1ST AVENUE
2ND AVENUE
FUTURE 3RD STREET
D STREET
E STREET
DIVARTY STREET
HIGHWAY 1
S STREET
DIVARTY STREET
R STREET
K STREET
L STREET
680
681
682
683
684
685
686
687
688
689690
691
692
693
694
695
696
697
698
699 700 701
702
703
704
705
706
707
708
709710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731732
733
734
735
736 737 738 739 740741 742
743
744
745746
747
748
749
750
751
752
753
754
755
756
757 780
781
782
783
784
785
786
787
788 789 790 791 792 793 794 795
796
797
798
799
804
805
806
807 808 809 810 811
812 813 814 815 816
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
IPB
3140.22
L-2
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
LOTS & PARCELS - SOUTH
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SEE SHEET L-1
ATTACHMENT 2
19 BMR SITE 2
APARTMENTS
NOT A PART
PARCEL OP-3.1
CITY OF MARINA
CSUMB
THE DUNES CITY PARK
TAMC
TAMC
HIGHWAY 1
MST
G STREET
H STREET
F STREET
Q STREET
D STREET
E STREET
M STREET
P STREET
S STREET
3RD STREET
1ST AVENUE
N STREET
LANE 3
6TH STREET
1ST AVENUE
6TH STREET
7TH STREET
B STREET
C STREET
D STREET
E STREET
HIGHWAY 1
5TH STREET
LANE 2
LANE 1
LANE 4
R STREET
O STREET
LANE 5
LANE 6
K STREET
L STREET
I STREET
J STREET
HIGHWAY 1CSUMB
2ND AVENUE 2ND AVENUE
1ST
AVENUE
G STREET
H STREET
D
STREET
E
STREET
N STREET
BMR SITE 2
APARTMENTS
LANE 12ND
AVENUE
LOT 860
P 146.1
LOT 868
P 146.1
LOT 871
P 147.2
LOT 623
P 139.7 LOT 644
P 132.9 LOT 657
P 126.9
LOT 664
P 125.4 HWY 1TMAC
LOT 637
P 133.8 CITY OF MARINA
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
RAA
3140.22
GR-1
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
GRADING AND DRAINAGE PLAN - NORTH
MARINA, CALIFORNIA
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SEE SHEET GR-2
PARCEL OP-4.3 PARCEL OP-4.1
SECTION A
A
NOTES:
ATTACHMENT 2
20 NOT A PART
PARCEL OP-4.2
PARCEL OP-4.3
PARCEL OP-4.4
PARCEL OP-4.1
PARCEL OP-3.1
PARCEL OP-3.2
PARCEL OP-3.3
NOT A PART
HIGHWAY 1
MST
S STREET
3RD STREET
LANE 3
DIVARTY STREET
1ST AVENUE
R STREET
K STREET
L STREET
HIGHWAY 1CSUMB
2ND AVENUE
1ST
AVENUE
K STREET
L STREET
D
STREET
E
STREET
P STREET
LANE 3
LOT 751
P 166.1
LOT 786
P 166.6 LOT 794
P 162.4
LOT 795
P 161.3
LOT 726
P 156.7
LOT 716
P 148.2
LOT 704
P 148.2 LOT 696
P 140.8
LOT 684
P 142.1
2ND
AVENUE
PARCEL OP-3.1 HIGHWAY 1
LOT 793
P 162.7
LOT 792
P 163.0
LOT 791
P 163.3
LOT 790
P 163.6
LOT 789
P 164.9
LOT 788
P 166.0
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
RAA
3140.22
GR-2
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
GRADING AND DRAINAGE PLAN - SOUTH
MARINA, CALIFORNIA
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SECTION B
B
SEE SHEET GR-1
ATTACHMENT 2
21 PHASE 2 WEST
THE DUNES
CITY PARK
BMR SITE 2
APARTMENTS
G STREET
H STREET
F STREET
Q STREET
D STREET
E STREET
M STREET
P STREET
S STREET
FUTURE 3RD STREET
1ST AVENUE
N STREET
LANE 3
6TH STREET
1ST AVENUE
6TH STREET
7TH STREET
B STREET
C STREET
D STREET
E STREET
5TH STREET
LANE 2
LANE 1
LANE 4
R STREET
O STREET
LANE 5
LANE 6
K STREET
L STREET
I STREET
J STREET
CITY OF MARINA
NOT A PART
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
IPB
3140.22
U-1
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
WATER & RECYCLED WATER PLAN - NORTH
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SEE SHEET U-2
PARCEL OP-4.3
CSUMB
PARCEL OP-3.2
PARCEL OP-3.1
MST
CITY OF MARINA
TAMC
ATTACHMENT 2
22 FUTURE 3RD STREET
DIVARTY STREET
1ST AVENUE
CITY OF MARINA
NOT A PART
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
IPB
3140.22
U-2
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
WATER & RECYCLED WATER PLAN - SOUTH
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SEE SHEET U-1
PARCEL OP-3.2
PARCEL OP-3.3
PARCEL OP-4.1
NOT A PART
PARCEL OP-4.2
PARCEL OP-4.3
PARCEL OP-4.4
ATTACHMENT 2
23 PHASE 2 WEST
THE DUNES
CITY PARK
BMR SITE 2
APARTMENTS
G STREET
H STREET
F STREET
Q STREET
D STREET
E STREET
M STREET
P STREET
S STREET
FUTURE 3RD STREET
1ST AVENUE
N STREET
LANE 3
6TH STREET
1ST AVENUE
6TH STREET
7TH STREET
B STREET
C STREET
D STREET
E STREET
5TH STREET
LANE 2
LANE 1
LANE 4
R STREET
O STREET
LANE 5
LANE 6
K STREET
L STREET
I STREET
J STREET
CITY OF MARINA
NOT A PART
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
IPB
3140.22
U-3
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
SANITARY SEWER PLAN - NORTH
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SEE SHEET U-4
CSUMB
PARCEL OP-4.3
PARCEL OP-3.2
PARCEL OP-3.1
MST
CITY OF MARINA
TAMC
ATTACHMENT 2
24 FUTURE 3RD STREET
DIVARTY STREET
1ST AVENUE
CITY OF MARINA
NOT A PART
E
I
N
E
S
O
N
W
EN
IT
H
S
G
R
SHEET
OF
SCALE:
DRAWN:
JOB No.: SUBMITTAL / REVISION
Civil Engineering
Land Surveying
6 Harris Court
Monterey, California
831.649.5225
whitsonengineers.com
1" = 100'
IPB
3140.22
U-4
11 AMENDED TENTATIVE MAP
UNIVERSITY VILLAGES - PHASE 3
SANITARY SEWER PLAN - SOUTH
Marina, California
APN: 031-221-015
9/3/2021
APH
FIRST SUBMITTAL
3/24/2022
APH
SECOND SUBMITTAL
SEE SHEET U-3
CSUMB
PARCEL OP-3.2
PARCEL OP-3.3
PARCEL OP-4.1
NOT A PART
PARCEL OP-4.2
PARCEL OP-4.3PARCEL OP-4.4
NOT A PART
ATTACHMENT 2
25 September 29, 2022, Item No. 11a
Honorable Mayor and Members City Council Meeting
of the Marina City Council of October 6, 2022
CITY COUNCIL TO CONSIDER ADOPTING RESOLUTION NO. 2022 -,
RECEIVING AN UPDATE PRESENTATION ON THE SPORTS CENTER ,
APPROVING EXPANDED ARCHITECTURAL AND PROFESSIONAL
SERVICES FOR THE AQUATIC CENTER AND CONNECTOR BUILDING AND APPROVING COAR DESIGN GROUP’S PROPOSAL IN THE AMOUNT OF $858,500.00 FOR THE EXPANDED SERVICES.
REQUEST:
It is requested that the City Council consider approving and adopting Resolution No. 20 22- , for the following actions:
1. Receiving update presentation, EXHIBIT A, for the Sports Center, Aquatic Center, Connector Building and outdoor Sports Pavilion (City of Marina Sports Complex) and associated site work.
2. Approving expanded architectural and professional SERVICES for the Aquatic Center, and Connector building; advancing architectural building and site design to 100% level , preparing bidding documents and architectural support services during construction.
3. Approving COAR’s proposal of $858,500, EXHIBIT B, for the expanded architectural and professional services.
BACKGROUND:
In June 2005, the City of Marina adopted a Parks and Recreation Facilities Master Plan (the Master Plan). The Master Plan adopted a mission statement that says, “The City of Marina is committed to establishing and maintaining facilities, parks and services that enhance the quality of life for all ages, cultural origins and abilities.” The Master Plan identified key goals pertaining to parks and recreation facilities and included: developing a centrally located recreation center complex for use by Marina citizens that includes an indoor swimming pool, gymnasium, basketball court, volleyball, and racquetball courts. (Goal 2; Objective 2-2). The Master Plan also established a goal to develop adequate level of funding for parks and recreational facilities now and in the future. (Goal 6; Objective 6-1, Policy 6-1).
When preparing the Master Plan, a survey was conducted at that time and distributed to 4,500 homes.
Approximately 321 people responded to the survey and 85% wanted a centralized recreation center, with an indoor pool as the highest rated use at 50%, followed by an indoor gym, volleyball, and racquetball at 40%.
In 2009, the City developed a Parks and Recreation Facilities Strategic Implementation Plan (the Implementation Plan) to provide a guiding document for strategic implementation for siting, constructing, and programming of the City’s parks and recreation facilities. The Implementation Plan had a goal to create a unified city by linking Central Marina with Southern and Northern Marina as the City grows and develops and a key component of this was to develop a quality recreation complex to accommodate recreation programs for people of all ages. The Implementation Plan recommended that the highest priority be placed on the following parks and facilities to augment the existing system:
1. Sports Complex with indoor swimming pool, gymnasium, and fitness center
2. Athletic Fields Complex - with baseball, soccer fields, fitness course and concession stand.
1 The Implementation Plan identified various funding options to develop these facilities and parks. - Impact fees
- General Fund (unallocated fund balance)
- Grants and corporate sponsorships
- Certificates of Participation
- Bond financing
- School joint use agreements
- Public/Private partnerships
- Special District Tax (Mello Roos)
- User fees
After 1994 when the former Fort Ord military base closed, the former military gym building and the adjacent indoor pool west of the intersection of 2nd Avenue and 9th Street were transferred to the City of Marina. Since that time, the pool building has remained vacant and deteriorated over time. The adjacent building was converted into a roller-skating arena and had been operated by a private business.
Both buildings were deteriorating quickly on the outside. In 2014, a grant was secured to put new roofs on both buildings, paint the outside, fix broken windows and doors and secure the buildings from vandalism. This was the first step in stabilizing these buildings for future use.
The City commenced a park planning process in 2018 for various park improvements including the sports center and aquatic center within the park at The Dunes. An open house on parks design was held on November 13th, 2018. At the open house, community members viewed plan sheets that showed the parks and bubble diagrams containing elements identified in master plans. The participants also had a pallet of park amenities to select from for possible inclusion. Staff and the consultant team received input from forty-four participants. The input was reviewed by staff and selection of elements were incorporated into draft conceptual parks plans for the park at The Dunes.
The City Council approved in the budget for fiscal year 2019-2020 a project to analyze the revitalization and renovation of the indoor pool and sprots center buildings. Jeff Katz Architecture (JKA) was hired as the prime consultant for the aquatic and sports center planning and analysis. The JKA team also includes Water Technology Inc, and Isaac Sports Group for the aquatic and financial planning elements of the projects.
The draft aquatic center concepts and financial strategy were presented to the public at an open house and a special City Council meeting on July 23, 2019. Input was received from both the public and the City Council. The City Council directed staff to complete final concepts plans for the aquatic center and to also develop a draft concept plant for a recreation sports complex at the former Water City Roller Hockey site along with a proposed financial and funding strategy.
On December 3rd, 2019, City Council received a presentation and provided comments on the draft report and financial analysis for the sports center and received an update on the aquatic center plan.
The City Council considered options for funding and addressing blight removal on former Fort Ord properties at the February 17th, 2021, City Council meeting. At that meeting, questions were asked whether roller hockey and leisure roller skating could be incorporated into the Sport Center. Staff was directed to work with JKA to update the sports center report including a financial analysis to include roller sports.
As part of the fiscal year 2021-2022 and fiscal year 2022-2023 budget that City Council approved on October 5th, 2021, $3.5 million from blight removal escrow bond proceeds was appropriated to move the sprots center through design and into construction.
2 On December 14, 2021, Resolution No. 2021-139, the City Council received presentation on the Sports Center including options to include roller sports in the programmed facilities. The City council directed staff and its consultant to begin design of the Sports Center, Aquatic Center, and an outdoor Pavilion for a possible 2022 bond; the outdoor pavilion was to be weather safe as reasonable; and that $3.5M budgeted is spent for the design of the new sports center and other two buildings and for the staff and consultants to include upgrading to a commercial kitchen.
The report concludes that the addition of a competitive roller sports rink into the Sports Center would require eliminating or significantly reducing important program space in the Sports Center including auxiliary gym, cardio/strength workout spaces, fitness studios, classes, multi-function room, family, and gender-neutral changing rooms and main gym area functions . Examples of uses potentially eliminated from the auxiliary gym include turf space for soccer, lacrosse, field hockey, and batting cages etc. The loss of these uses represents a significant decrease in the total resident users as well as the multi - generational use of the Sports Center . Maintaining the roller sports rink design in the Sports Center would result in a reduction of the projected dail y users by 51% and a reduction in annual revenue by $493,000.
The Report recommends construction of a separate Pavilion in a future phase if roller sports is considered. Leisure roller skating can be accommodated in the current Sports Center design.
The City issued Service Orders through the on-call architectural services to JKA, currently renamed to COAR Design Group, in the amount of $913,500 for architectural design, bidding document preparation, and architectural support during construction for the Sports Center Building Rehabilitation project and schematic and design development to 30% level for the Aquatic Center and outdoor Sports Pavilion.
On July 20, 2022, an in-person Marina community engagement meeting for the project was conducted followed by public presentation. There were 25 and 21 attendees of the community engagement and public presentation, respectively. Questions and comments were received at the community engagement as well as through an email account created specifically for this project. Questions and comments are tabulated and included as EXHIBIT C.
ANALYSIS:
The rehabilitation of the existing Sports Center and Aquatic Center and construction of new Connector Building is proposed to be named the City of Marina Sports Complex Phase 1 Project.
The updated Sports Complex plans, report and financial analysis have been prepared to a Schematic Design level and are included in the presentation, EXHIBIT A. A presentation on the updated Sports Complex plans, report and financial analysis will be made by staff and consultants.
The current design includes a recommended ‘Connector’ or Entry Building that would consist of approximately 8,500 square feet of new construction between the two existing buildings to provide a centralized entrance to both facilities as well as additional space to support both facilities including:
centralized office space for shared staff, front desk and access control, restrooms, additional storage, additional multi-purpose space to be used as rentable/revenue generating space for either facility, and a commercial kitchen to support community programs and the included café. The financial analysis reflects the added value of this additional space and program and the design of both the Aquatic and Sports Center benefit from utilizing this additional space ra ther than trying to accommodate all the suggested programming within the existing footprint(s).
The expanded architectural and professional services include architectural design to 100% level, prepare bidding documents and architectural support services during construction for the Sports Center, Aquatic Center, and Connector Building. This also includes the design of required site improvements including the surrounding parking lot. Elements of the future park master plan ha ve been incorporated into the current design and will continue to be coordinated to ensure a cohesive overall park design. 3 FISCAL IMPACT:
An additional $858,500.00 will be spent for the expanded architectural and professional services. The total architectural and professional services with COAR is for a time and material not to exceed $1,772.000.
Funding for the aquatic and sports center studies were included in the Capital Improvement Program budgets for fiscal years 2018 -2019 and 2019 -2020. Funding for design of the Sports Center improvements was approved as part of the fiscal year 2021-2022 and fiscal year 2022-2023 budget.
The updated construction costs estimate is $26,923,344 for the City of Marina Sports Complex Phase 1 Project which have increased since the initial cos ts estimates which were: $3.5 - $5.0 million for the Sports Center; $8.0 - $10.0 million for the Aquatic Center; and $3.0 million for the connector building.
While staff will not be requesting final decisions on funding the complete project, staff will be making a presentation that will review funding options and alternatives.
CONCLUSION:
This request is submitted for City Council consideration and comment.
Respectfully submitted,
Elvie Morla-Camacho, P.E., QSD
Project Management Services Wallace
Group
REVIEWED/CONCUR:
Brian McMinn, P.E., P.L.S.
Public Works Director/City Engineer
City of Marina
Layne P. Long
City Manager
City of Marina
4 RESOLUTION NO. 2022-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA RECEIVING
AN UPDATE PRESENTATION ON THE SPORTS CENTER, APPROVING
EXPANDED ARCHITECTURAL AND PROFESSIONAL SERVICES FOR THE
AQUATIC CENTER AND CONNECTOR BUILDING AND APPROVING COAR DESIGN GROUP’S PROPOSA L IN THE AMOUNT OF $858,500.00 FOR THE EXPANDED SERVICES.
WHEREAS, The City of Marina acquired the former military pool and the adjacent vacant building west of the intersection of 2nd Avenue and 9th Street as part of the closure of the former Fort Ord; and
WHEREAS, plans need to be developed to revitalize the use of the pool building and adjacent former gym building into an aquatic center and sports center; and
WHEREAS, City Council approved a project to analyze alternatives for revitalization of the pool building in the fiscal year 2018-2019 budget; and
WHEREAS, City Council approved a project to analyze alternatives for the former gym building in fiscal year 2019-2020; and
WHEREAS, the City entered in an agreement with Jeff Katz Architecture (JKA) as the prime consultant for the aquatic and sports center planning and analysis; and
WHEREAS, draft aquatic center concepts and financial strategy were presented to the public and an open house and a special City Council meeting on July 23rd, 2019, and input was received at that time; and
WHEREAS, on December 3, 2019, the City Council received a presentation and provided comments on the draft report and financial analysis for the sports center and received an update on the aquatic ce nter plan.; and
WHEREAS, on December 14, 2021, Resolution No. 2021-139, the City Council received presentation on the Sports Center including options to include roller sports in the programmed facilities; and
WHEREAS, the City issued Service Orders through the on-call architectural services to JKA, subsequently renamed to COAR Design Group, in the amount of $913,500 for architectural design, bidding document preparation, and architectural support during construction for the Sports Center Building Rehabilitation project and schematic and design development to 30% level for the Aquatic Center and outdoor Sports Pavilion; and
WHEREAS, on July 19, 2022, an in-person Marina community engagement for the project was conducted followed by public presentation on July 20, 2022; and
WHEREAS, the rehabilitation of the existing Sports Center and Aquatic Center and construction of new Connector Building is proposed to be named City of Marina Sports Complex Phase 1 Project; and
WHEREAS, the expanded architectural and professional services include architectural design to 100% level, prepare bidding documents and architectural support services during construction for the Aquatic Center, and Connector Building.
5 Resolution No. 2022-
Page Two
WHEREAS, the approval of expanded architectural and professional services and approval of COAR’s cost proposal of $858,500 for a total contract amount of $1,772.000 (time and material s not to exceed) for the scope of work which includes architectural design to 100% level, prepare bidding documents and architectural support services during construction for the Sports Center, Aquatic Center, and Connector Building for the City of Marina Sports Complex Phase 1 Project and schematic and design development to 30% level for outdoor Sports Pavilion; and
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Marina that does hereby:
1. Receive an update presentation for the Sports Center, Aquatic Center, Connector Building and outdoor Sports Pavilion (City of Marina Sports Complex) and associated site work; and
2. Approve expanded architectural and professional services for the Aquatic Center, and Connector building; advancing a rchitectural building and site design to 100% level, preparing bidding documents and architectural support services during construction; and
3. Approve COAR Design Group’s proposal of $858,500 (EXHIBIT B ) for the expanded architectural and professional services.
PASSED AND ADOPTED by the City Council of the City of Marina at a regular meeting duly held on the 6th day of October 2022, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
_________________________
Bruce C. Delgado, Mayor
ATTEST:
_________________________
Anita Sharp, Deputy City Clerk
6 City of
Marina
Aquatic and Sports Center
City Council Presentation
EXHIBIT A
7 7
PROJECT TEAM
Matt Kingdon Courtney Sluder Stuart Isaac
COAR Design Group COAR Design Group The Isaac Sports Group Steve Crocker
Water Technology Inc.
EXHIBIT A
8 8
Project Progress
» Schedule
» Community Engagement
» Project Goals
Proposed Pr
ogram
» Sports Cent
er
» Aquatic Center
» Connector
» Sports P
avilion
Phasing Options
Financial Analysis
Next Steps
AGENDA
EXHIBIT A
9 9
PROJECT SCHEDULE
APRIL 2022
MAY
JUNE
JULY
AUG
SEP
OCT
NOV
DEC
JAN 2023
FEB
MAR
APRIL
MAY
JUNE
JULY
AUG
SEP
OCT
NOV
DEC
JAN 2024
FEB
MAR
TASK DESCRIPTION
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
DESIGN PHASE CITY REVIEW
COMMUNITY ENGAGEMENT COUNCIL MEETING
CONSTRUCTION*
* CONSTRUCTION DURATION PENDING CONFIRMATION OF PHASING
EXHIBIT A
10 10
COMMUNITY ENGAGEMENT
B1
B3
B2
B4
B6
5 6
1 3
4 2
2 B5
9TH STREET
2ND AVE.
● COAR and ISG conducted an open
house over the course of two
days to gather feedback from the
community
● Overall, comments were supportive
with majority of concerns related to
adjacent park project and exterior
aesthetics
● COAR digitized and compiled
feedback to incorporate into
updated design where possible
EXHIBIT A
11 11
SLIDE TITLE
PROJECT GOALS
● Provide expanded sport and
recreational activities to a much
broader and inclusive range of
Marina residents
● Provide expanded access, use,
and multi generational programs
throughout the day/week
● Concurrent and flexible
programming
● Accommodate users of all ages,
abilities, and special needs
EXHIBIT A
12 12
PROJECT LOCATION
EXHIBIT A
13 13
SITE PLAN - OVERALL
RENOVATED INDOOR
SWIMMING POOL
FUTURE SPORTS
PAVILION
CONNECTOR
BUILDING
RENOVATED
SPORTS CENTER
Conceptual Plan by
Verde Design
EXHIBIT A
14 14
B1
B3
B2
B4
B6
5 6
1 3
4 2
2 B5
9TH STREET
2ND AVE.
SITE PLANSITE PLAN
LEGEND
VEHICLE CIRCULATION
PEDESTRIAN CIRCULATION
MULTIUSE FIELD
PLAYGROUND
PICNIC / LAWN GAMES AREA
PEDESTRIAN PLAZA WALKWAY
EXISTING TREE WITH NEW BENCH
PASSENGER DROPOFF / PICKUP
RENOVATED AQUATIC CENTER
RENOVATED SPORTS CENTER
POTENTIAL CONNECTOR BUILDING
CHAPEL / COMMUNITY BUILDING
RESTROOM
SPORTS PAVILION
MULTIUSE FIELD
PLAYGROUND
PICNIC / LAWN GAMES AREA
PEDESTRIAN PLAZA WALKWAY
EXISTING TREE WITH NEW BENCH
PASSENGER DROPOFF / PICKUP
RENOVATED AQUATIC CENTER
RENOVATED SPORTS CENTER
POTENTIAL CONNECTOR BUILDING
CHAPEL / COMMUNITY BUILDING
RESTROOM
SPORTS PAVILION
MULTI-USE FIELD
PICNIC / LAWN GAME AREA
PEDESTRIAN WALKWAY / PLAZA
EXISTING TREE WITH NEW BENCH
PASSENGER DROP-OFF / PICK-UP
ENTRY PLAZA
RENOVATED AQUATIC CENTER
RENOVATED SPORTS CENTER
POTENTIAL CONNECTOR BUILDING
CHAPEL / COMMUNITY BUILDING
RESTROOM
POTENTIAL SPORTS PAVILION
EXHIBIT A
15 15
9TH STREET
2ND AVE.
RENOVATED
AQUATIC CENTER
FUTURE SPORTS
PAVILION
RENOVATED
SPORTS CENTER
CONNECTOR
BUILDING
SITE PLANSITE PLAN
EXHIBIT A
16 16
SPORTS CENTER - FLOOR PLAN
AQUATIC
CENTER
2ND AVE.
EXHIBIT A
17 17
SPORTS CENTER - COURT PLAN
LEGEND
HS BASKETBALL COURT
50’ X 84’
VOLLEYBALL COURT
30’ X 60’
PICKLE BALL
20’ X 44’
EXHIBIT A
18 18
SPORTS CENTER - PROGRAM
EXHIBIT A
19 19
SPORT CENTER - INTERIOR RENDERING
EXHIBIT A
20 20
SPORTS CENTER - EXTERIOR RENDERING
EXHIBIT A
21 21
2 1
6 4
2 1
6 6
5 1
2 2
6 7
3 1
SPORTS CENTER - ELEV ATIONS & MATERIALS
WEST
NORTH
SOUTH
EAST
CORRUGATED METAL PANEL
METAL ROOF
FIXED WINDOW
OVERHEAD DOOR
STUDIO/MPR PATIO
STUCCO
FITNESS PATIO
GLASS STOREFRONT CORRUGATED METAL PANEL
TRANSLUCENT FIBERGLASS PANEL
8’ 32’16’4’
SCALE:
0 STUCCO
ENTRY
BUILDING
ENTRY ENTRY
BUILDINGBUILDING
EXHIBIT A
22 22
SITE PLANSITE PLAN
9TH STREET
2ND AVE.
RENOVATED
AQUATIC CENTER
FUTURE SPORTS
PAVILION
RENOVATED
SPORTS CENTER
CONNECTOR
BUILDING
EXHIBIT A
23 23
AQUATIC CENTER - FLOOR PLAN
1 19
18 19
19 19
19 19
19 19
19 1
17 5
6 4
7 9
10 14
12 14
11 8
13 15
2 3
16 POOL LIFT
GEYSERS
BEACH ENTRY & SHALLOW WATER PLAY | 1190SF
VOLLEYBALL
PLAY STRUCTURE
BASKETBALL
WALL SPRAYS
20Y LAP SWIM POOL | 1415SF
UNDERWATER BENCH
15’ DIA. VORTEX
WELLNESS/INSTRUCTIONAL AREA | 530SF
MASSAGE JETS
CURRENT CHANNEL | 73SF
DONUT SPRAYS
THERAPY BENCH/SOCIAL AREA | 306SF
10 LANE X 11 LANE, 25Y X 25M COMPETITION
POOL | 6163SF
WIBIT INFLATABLE OBSTACLE COURSE
STARTING BLOCKS
SPECTATOR SEATING
PARKING
RENOVATED
SPORTS
CENTER
EXHIBIT A
24 24
AQUATIC CENTER - PROGRAM
EXHIBIT A
25 25
AQUATIC CENTER - INTERIOR RENDERING
EXHIBIT A
26 26
AQUATIC CENTER - EXTERIOR RENDERING
EXHIBIT A
27 27
AQUATIC CENTER ELEV ATIONS & MATERIALS
GLASS STOREFRONT
CORRUGATED METAL PANEL
TRANSLUCENT FIBERGLASS SKYLIGHT
ENTRANCE SIGNAGE
SHINGLE ROOF
PATIO
FIXED WINDOW
LOUVERS
STUCCO
FROSTED WINDOWS WITH HORIZONTAL SUNSHADE
WOOD PERGOLA
CONNECTOR BUILDING
OVERHEAD DOOR
GLASS STOREFRONT CORRUGATED METAL PANEL
HORIZONTAL SUN SHADE
8’ 32’16’4’
SCALE:
0 TRANSLUCENT FIBERGLASS PANEL
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 1
8 6
11 12
2 3
7 8
2 3
5 3
1 2
9 6
5 3
8 2
4 10
9 13
6 Lorem Ipsum
WEST
NORTH
SOUTH
EAST
ENTRY ENTRY
BUILDINGBUILDING
ENTRY ENTRY
BUILDINGBUILDING
ENTRY ENTRY
BUILDINGBUILDING
EXHIBIT A
28 28
SITE PLANSITE PLAN
9TH STREET
2ND AVE.
RENOVATED
AQUATIC CENTER
FUTURE SPORTS
PAVILION
RENOVATED
SPORTS CENTER
CONNECTOR
BUILDING
EXHIBIT A
29 29
5 4
1 2
3 6
5 2
3 4
CONNECTOR BUILDING - FLOOR PLAN & ELEV ATIONS
SIGNAGE
CORRUGATED METAL PANEL
TRANSLUCENT WALL SYSTEM
COMMUNITY ART OPPORTUNITY
PAINTED STANDING SEAM ROOF
OVERHEAD DOOR
NORTH
SOUTH
RENOVATED
AQUATIC
CENTER
RENOVATED
SPORTS
CENTER
PARKING
EXHIBIT A
30 30
LOBBY- INTERIOR RENDERING
EXHIBIT A
31 31
SITE PLANSITE PLAN
9TH STREET
2ND AVE.
RENOVATED
AQUATIC CENTER
FUTURE SPORTS
PAVILION
RENOVATED
SPORTS CENTER
CONNECTOR
BUILDING
EXHIBIT A
32 32
● There is limited space on current
site for a pavilion and would require
relocating the fortag trail
● Master Plan includes an outdoor
roller rink at nearby location
● Size:
- 180ft x 105ft overall
- 164ft x 80 ft
● Roller sports priority use
● Pavilion can be used for other uses
including:
- Indoor soccer & lacrosse
- Pickle ball overflow
- Flexible court space
- Open air event space
SPORTS PAVILION STUDY
*CONCEPTUAL PLAN FROM CITY OF MARINA PARKS AND
RECREATION MASTER PLAN
Conceptual Plan by
Verde Design
RENOVATED INDOOR
SWIMMING POOL
FUTURE SPORTS
PAVILION
CONNECTOR
BUILDING
RENOVATED
SPORTS CENTER
EXHIBIT A
33 33
SPORTS PAVILION - FLOOR PLAN & ELEV ATIONS
WEST
SOUTH
SPECTATOR SEATING
METAL ROOF
STEEL STRUCTURE
ROLLER RINK
RETRACTABLE SIDES
PICKLE BALL
20’ X 44’
TENNIS
78’ X 36’
EXHIBIT A
34 34
B1
B3
B2
B4
B6
5 6
1 3
4 2
2 B5
9TH STREET
2ND AVE.
SITE PLANSITE PLAN
LEGEND
VEHICLE CIRCULATION
PEDESTRIAN CIRCULATION
MULTIUSE FIELD
PLAYGROUND
PICNIC / LAWN GAMES AREA
PEDESTRIAN PLAZA WALKWAY
EXISTING TREE WITH NEW BENCH
PASSENGER DROPOFF / PICKUP
RENOVATED AQUATIC CENTER
RENOVATED SPORTS CENTER
POTENTIAL CONNECTOR BUILDING
CHAPEL / COMMUNITY BUILDING
RESTROOM
SPORTS PAVILION
MULTIUSE FIELD
PLAYGROUND
PICNIC / LAWN GAMES AREA
PEDESTRIAN PLAZA WALKWAY
EXISTING TREE WITH NEW BENCH
PASSENGER DROPOFF / PICKUP
RENOVATED AQUATIC CENTER
RENOVATED SPORTS CENTER
POTENTIAL CONNECTOR BUILDING
CHAPEL / COMMUNITY BUILDING
RESTROOM
SPORTS PAVILION
MULTI-USE FIELD
PICNIC / LAWN GAME AREA
PEDESTRIAN WALKWAY / PLAZA
EXISTING TREE WITH NEW BENCH
PASSENGER DROP-OFF / PICK-UP
ENTRY PLAZA
RENOVATED AQUATIC CENTER
RENOVATED SPORTS CENTER
POTENTIAL CONNECTOR BUILDING
CHAPEL / COMMUNITY BUILDING
RESTROOM
POTENTIAL SPORTS PAVILION
EXHIBIT A
35 35
PROPOSED PHASING
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 1:
SPORTS CENTER
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 2:
SPORTS PAVILION
PHASE 1A:
PARKING AND SITE WORK
EXHIBIT A
36 36
PROPOSED PHASING
SPORTS CENTER
APPROX. $8,400,000
AQUATIC CENTER
APPROX. $11,000,000
CONNECTOR BUILDING
APPROX. $5,000,000
SPORTS PAVILION
APPROX. $3,900,000
SITE WORK
APPROX. $2,600,000
TOTAL
$27 ,000,000
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 1:
SPORTS CENTER
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 2:
SPORTS PAVILION
PHASE 1A:
PARKING AND SITE WORK
EXHIBIT A
37 37
PHASING OPTION 2
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 2:
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 3:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
PHASE 1A:
PARKING AND SITE WORK
EXHIBIT A
38 38
PHASING OPTION 2
SPORTS CENTER &
SITE WORK
APPROX. $12,100,000
SPORTS PAVILION
APPROX. $3,900,000
TOTAL
$31,500,000
AQUATIC CENTER &
CONNECTOR BUILDING
APPROX. $19,400,000
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 2:
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 3:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
PHASE 1A:
PARKING AND SITE WORK
EXHIBIT A
39 39
PHASING OPTION 3
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 3:
AQUATIC CENTER
PHASE 4:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
PHASE 2:
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
EXHIBIT A
40 40
PHASING OPTION 3
SPORTS CENTER &
SITE WORK
APPROX. $12,100,000
CONNECTOR BUILDING
APPROX. $5,700,000
AQUATIC CENTER
APPROX. $16,000,000
SPORTS PAVILION
APPROX. $3,900,000
TOTAL
$33,800,000
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 3:
AQUATIC CENTER
PHASE 4:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
PHASE 2:
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
EXHIBIT A
41 41
PHASING SUMMARY (NOT INCLUDING SPORTS PAVILION)
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 1:
SPORTS CENTER
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 2:
SPORTS PAVILION
PHASE 1A:
PARKING AND SITE WORK
PROPOSED PHASING
• ESTIMATED COST: $27M
• CONSTRUCTION TIME: 10 MONTHS
• MOST EFFICIENT
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 2:
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 3:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
PHASE 1A:
PARKING AND SITE WORK
PHASING OPTION 2
• ESTIMATED COST: $31.5M
• TOTAL CONSTRUCTION TIME: 18 MONTHS
• POTENTIAL ADDED COSTS DUE TO
UNKNOWN TIMING/ ESCALATION OF
PHASING
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 3:
AQUATIC CENTER
PHASE 4:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
PHASE 2:
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
PHASING OPTION 3
• ESTIMATED COST: $33.8M
• TOTAL CONSTRUCTION TIME: 26 MONTHS
• POTENTIAL ADDED COSTS DUE TO
UNKNOWN TIMING/ ESCALATION OF
PHASING
NOTE: AT THIS EARL Y DESIGN STAGE WE RECOMMEND AN ADDITIONAL 12% DESIGN CONTINGENCY BE APPLIED TO THE PROJECT BUDGET TO ALLOW FOR UNANTICIPATED DESIGN & ENGINEERING ITEMS TO BE ADDRESSED AS WELL AS FLUCTUATING MARKET CONDITIONS.
EXHIBIT A
42 42
OVERALL FLOOR PLAN
PARKING
2ND AVE.
PARKING
PARKING
EXHIBIT A
43 43
PROJECT SCHEDULE
* CONSTRUCTION DURATION PENDING CONFIRMATION OF PHASING APRIL 2022
MAY
JUNE
JULY
AUG
SEP
OCT
NOV
DEC
JAN 2023
FEB
MAR
APRIL
MAY
JUNE
JULY
AUG
SEP
OCT
NOV
DEC
JAN 2024
FEB
MAR
TASK DESCRIPTION
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
DESIGN PHASE CITY REVIEW CONSTRUCTION*
EXHIBIT A
44 44
NEXT STEPS: RECOMMENDED
» Proceed with all design phases for the sports center, aquatic center, connector building,
and sitework.
» Coordinate wit
h concurrent park master plan to ensure a cohesive
design and coordinated site work.
» At the end of t
he design development phase cost estimates would be
updated and potential value engineering options evaluated to keep the project on budget.
» Sports cent
er, aquatic center, and connector building would then
proceed into construction documents, bidding and construction. » The sports pa
vilion design development package would then be
available to proceed into further construction documents and engineering whenever funding and resources are available, and site location is determined.
» This approach best utilizes funding b
y taking a cohesive approach
to the overall design, streamlines construction, separates the sports pavilion that can be constructed in separate phase, as well as allowing the full facility to operate efficiently as one.
» This approach also limits risk of policy or code changes t hat could
impact the design if project is phased.
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 1:
SPORTS CENTER
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 2:
SPORTS PAVILION
PHASE 1A:
PARKING AND SITE WORK
RENOVATED INDOOR
SWIMMING POOL
FUTURE SPORTS
PAVILION
CONNECTOR
BUILDING
RENOVATED
SPORTS CENTER
EXHIBIT A
45 45
NEST STEPS: ALTERNATIVE OPTION PHASED PROJECT
» Proceed with all design phases of the sports center only. » Design would consider site impr
ovements and infrastructure only as
required for the sports center project.
» After completion of schematic and design de
velopment, with
estimating, the sports center would then proceed into construction documents, bidding and construction.
» This approach potentially risks r
ework in future phases (the
aquatic center and connector building) of site improvements and/or infrastructure completed as a part of the sports center project. » This approach also limits t
he cohesiveness of the overall design/
program solution for both facilities which could impact program spaces, operations, and costs of both facilities.
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 2:
CONNECTOR BUILDING
AQUATIC CENTER
PHASE 3:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
PHASE 1A:
PARKING AND SITE WORK
66 REG, 2 ADA
34 REG
75 REG, 10 ADA
24 REG
TRASH
PHASE 3:
AQUATIC CENTER
PHASE 4:
SPORTS PAVILION
PHASE 1:
SPORTS CENTER
PHASE 2:
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
POTENTIAL TEMPORARY
ENTRANCE DURING
CONSTRUCTION OF
CONNECTOR BUILDING
PHASE 2A:
COURTYARD
EXHIBIT A
46 46
OVERALL - BUILDING DESIGN - EXTERIOR RENDERING
EXHIBIT A
47 47
Thank
Y ou.
EXHIBIT A
48 48
6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177 September 23, 2022
Layne Long
City Manager
City of Marina
211 Hillcrest Avenue
Marina, CA 93933
RE: Architectural Services – Marina Aquatic and Sports Center Design Phase Dear Layne,
Thank you for the op portunity to provide this proposal for Design and Enginee ring Consulting services to further develop the current Schematic designs for the existing Aquatic and Sports Center facilities as well as the addition of a n Entry Building and assessment of a Sports Pavilion. This proposal includes the following services: Architectural, Landscape Architecture, Structural, Civil, Aquatic, Mechanical and Electrical Engineering services as well as updated financial analysis and program ming input from ISG and a specialty kitchen consultant.
We are excited to continue working with the City of Marina on this project utilizing the current programming and design for the rehabilitation of the existing Aquatic and Sports Center buildings, as well as a new Entry building connecting the two facilities and exploration of an ancillary sports pavilion on the site of the former Fort Ord. We estimate the overall construction cost for all project phases to be about $28 million. This proposal expands the previously proposed services to complete the project as a single phase through construction, except for the Sports Pavilion which will just be completed to a Design Development level per the previous agreement.
We have proposed the following scope of services based on the current Schematic Design and what we believe is necessary to successfully complete this project. However, if there are scope items that are not included, or that are not necessary, we would be happy to re-assess the scope and fee as needed. We will also provide coordination with the surrounding park master plan and assessment of impacts to our project including site circulation, parking, signage, storm water and utilities.
The following sections further outline our intended scope of services for each phase of the project:
SCHEMATIC DESIGN PHASE (Sports Center, Aquatic Center, Entry Building, Sports Pavilion) Unchanged from previous proposal.
1. Meet with Project Team to discuss any adjustments to the established budget and program as well as potential phasing, schedule and design issues.
2. Develop Community Engagement approach and schedule.
3. Develop existing site and building plans based on field investigation and review of any as-builts.
EXHIBIT B
49 Marina Aquatic & Sports Center
September 23, 2022
6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177
4. Confirm Aquatic Program, Capacities, and Mechan ical Program for the Aq uatic Center.
5. Determine overall utility load requirements for the proje ct to ensure adequate capacity for the facilities at the existing point of connection.
6. Determine impacts to Site Utilities including lighting, audio, electrical, gas, sewer and water.
7. Prepare updated program for each facility based on initial project finding, base plans and modified per discussions with the project team and community engagement.
8. Develop aquatic and building design alternativ es as necessary and review with the City
9. Create updated base drawings and reconcile with current design (Sports Center, Aquatic Center, Sports Pavilion)
10. Prepare initial Site Planning including preliminary storm water hydrology , fire access, grading, utilities and phasing analysis.
11. Prepare Schematic Site Plan, Floor Plan(s), and initial design model for review.
12. Present to Project Team for schematic design review and approval to proceed with current program and scope extents . At this stage any adjustme nts to the scope/program should be identified.
13. Refine Schematic Plans to reflect overall scope requirements. These plans will be schematic in nature and are intended only to provide information with regard to overall extent of the project.
14. Prepare basis of design for additional design elements, aquatics, building systems, site lighting, site structures, planting and irrigation, hardscape, and miscellaneous items with imagery where necessary to communicate design approach.
15. Prepare interior and exterior renderings of proposed design and provide an initial walk-thru of the 3D model for design review.
16. Prepare Opinion of Probably Co st and m eet with the Project Team to discuss budget, program and design issues.
17. During this phase ISG will build on, update, and enhance its prior work on both the Aquatic Center and th e Sports C enter. This analysis will consider the combined Aquatic Center and Sports Center option , as well as maintaining independent financial and operational analysis for each facility for comparison. This analysis will also include the analysis of the programming, operational, and financial impact of two new elements: the Sports Pavilion (multi-sport rink configuration) and the Entry building connecting the Aquatic Center and the Sports Center.
18. COAR and ISG will also work with the city to facilitate public and community engagement with stakeholders, users, and community organiz ations as well as updated market research.
19. This phase is anticipated to be 6 week s long and include two in-person and two digital meetings.
20. After obtaining approval o f Schematic Design, we will proceed into Design Development.
EXHIBIT B
50 Marina Aquatic & Sports Center
September 23, 2022
6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177
DESIGN DEVELOPMENT PHASE (Sports Center, Aquatic Center, Entry Bldg., Sports Pavilion) Unchanged from previous proposal.
1. Refine design of each facility (Sports Center, Aquatic Center, Entry Building, Sports Pavilion) to approximately 30% design completion including Site Plan s, Architectural Plans, and Engineering Plans.
2. Meet with the Building Department, Health Department and any applicable utility companies or other points of coordination as necessary to establish expectations for the project and understand timelines for incorporation into the project schedule(s).
3. Updated site analysis including delineation of the recommended scope and limit of work relative to the future park project.
4. Prepare preliminary material and equipment selections for review.
5. Prepare updated design renderings and project walk thru.
6. Develop Landscape Planting and Irrigation design.
7. Develop low voltage basis of design with City input as required.
8. Develop and r efine plans as needed for each discipline including site plan (s), grading plan(s), utility plan (s), electrical/lighting plan(s), landscape plan (s), mechanical plan (s), structural plan (s) and architectural plans to describe design intent for each of the project elements and systems.
9. Aquatics plans for pool and water features, slide, piping and equipment including Pool Wall Profile, Shapes/Depths, and develop updated Water Activities and Features including the refinement of Mechanical Equipment, Development of Mechanical Equipment Layout and Utility Requirements for new design
10. Prepare preliminary Interior Elevations, Building Sections, Reflected Ceiling Plan and Roof Plan.
11. Preliminary Water, Sewer and Drainage Study.
12. Preliminary Stormwater Control Plan in accordance with City requirements.
13. Prepare prelim inary grading , structural , mechanical and electrical engineered plans for the new design
14. Develop project estimate.
15. Provide submittal and presentation to Project Team for design review and approval to proceed with current design direction . At this stage any adjustments to the design and phasing should be identified.
16. This phase is anticipated to be 12 weeks long and include one in-person and two digital meetings.
17. During Design Dev elopment I SG will continue to work with the COAR Team to update the program, management, and financial models and analysis based on final design elements. The Services in the Design Development an d Construction Phases will also include an analysis of any cost cutting or value engineering based on impact on program, participation, management, and financial operations.
EXHIBIT B
51 Marina Aquatic & Sports Center
September 23, 2022
6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177
18. This phase also includes Supplemental Topographic Survey as needed to support our specific project needs. These fees have been identified separately.
19. After obtaining approval of Design Development, we will proceed into Construction Documents.
CONSTRUCTION DOCUMENTS PHASE (Sports Center, Aquatic Center, Entry Bldg.) Revised to include Aquatic Center & Entry Building.
1. Prepare drawings and specifications suitable for permitting and bidding of the improvements to clea rly delineate the Contractor's sco pe of work, including required architectural , civil, structural, mechanical, land scape, aquatic and electrical design (including low voltage).
2. Submittals will be made to the City at 60% CDs, 90% CDs, 100% CDs and will include plans and specifications. A final FOR CONSTRUCTION document set will be distributed for construction once permitting is complete. It is assumed that the City will provide all required General and Supplementary Conditions and Bidding Information.
3. Submit plans to City Building Department for Building permit plan check and perform all req uired revisions to construction documents based on Building Department's plan check comments (Note: plan che ck and permit fees are not included).
4. Submit plans to County Health Department for Pool permit plan check and perform all req uired revisions to construction documents based on Health Department's plan check comments (Note: plan check and permit fees are not included).
5. Prepare final Signage, Fixtures, Furnishings and Equipment plans for the Sports Center.
6. Prepare updated cost opinion at each milestone.
7. Provide drawings and specifications (in electronic format) for bid package. For this proposal it is assumed that the City will advertise, assemble and distribute bid packages to General Contractors.
8. Interpret and clarify contract documents for bidders and assist in issuing addenda as required.
9. Attend a Pre-Bid walkthrough at the site with all interested contractors.
10. Participate i n bid revi ew of contractor's detailed cost breakdown and assist the City in evaluation of the bids.
11. This phase is anticipated to be 16 weeks long (from start to permit submittal) and include two in-person and four digital meetings.
CONSTRUCTION ADMINISTRATION PHASE (Sports Center, Aquatic Center, Entry Bldg.) Revised to include Aquatic Center & Entry Building as well as consultant support.
1. Develop RFI responses as required to support Owner requests and to coordinate Contractor questions in the field
2. Coordinate all RFI review by provided consultants
EXHIBIT B
52 Marina Aquatic & Sports Center
September 23, 2022
6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177
3. Set Up and Manage an RFI log to enable all stakeholders to verify status
4. Consultant shall prov ide ASI’s as required to reflect changes in scope or modifications made necessary due to changed field conditions based on the direction of the Owner
5. Where required, the ASI’s shall include all drawings and specifications required to obtain the cons truction permits and approvals of the governmental authorities having jurisdiction over the Project.
6. Review Submittals as required by Contract Documents and c oordinate all submittal review by provided consultants
7. Set Up and Manage a submittal review document to enable all stakeholders to verify status of submittals
8. Coordination of consultants for support as required on an hourly basis.
9. Provide bi-weekly on-site project support through the course of construction and as requested by the Owner
10. This phase is anticipated to be 40 weeks long and include twenty on site meetings and twenty digital meetings.
ASSUMPTIONS & ADDITIONAL SERVICES
The following items are not included in the Proposed Services but can be provided as additional services only after written authorization is received. Unless a subsequent fixed fee proposal is provided, the work will be done on an hourly basis according to the terms established under our as-needed contract with the City.
Additional Services not included in our proposed scope of work include:
1. Title search and easement identification.
2. Additional design or drawings for tree relocation, temporary irrigation, drainage or detention systems beyond the project boundary . See Exhibit C attached for assumed project boundary.
3. Additional design or drawings for offsite water, sewer or storm drain systems outside the project boundary.
4. Design o f fire access, fire acc ess design or agency processing bey ond our immediate site area.
5. Site signage design including overall park signage/wayfinding.
6. Assessment of Management and/or Partnership Options, Funding and Sponsorship Opportunities, Economic Impact Analysis or any ISG services during construction or startup.
7. Boundary Survey/Mapping, Traffic Analysis, Signal Design and/or Median Improvements.
8. Off-site Improvements, Work/Design in Public-Right-of-Way
9. Recycled Water Design, Plans, and DEH permitting.
10. Fence, Gate, Perimeter, and/or Retaining Wall Design.
EXHIBIT B
53 Marina Aquatic & Sports Center
September 23, 2022
6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177
11. Fire Protection Design and Engineering , Flow Test , Fire Sprinkler Design, Sprinkler Demand Calculations (anticipated as a deferred submittal).
12. Environmental Studies and Reports.
13. Geotechnical Engineering and Reports, Infiltration Testing.
14. Evaluation report providing recommendations for pavements, structures, earthworks, utilities, storm water infiltration, etc.
15. Additional Park improvements including playgrounds, sports fields, or site lighting.
16. HVAC studies and Life Cycle Cost Analysis.
17. Noise Studies and/or Acoustical studies and analysis.
18. Revisions to Contract Documents resulting from Owner requested changes to documents previously approved by the Owner, or due to code or zoning changes made subsequent to Owner approval.
19. Preparing separate construction document pac kages for discretionary permits , alternate bid items or project phasing.
20. Attendance of any publ ic hearings and/or additio nal meetings other t han detailed in this proposal.
21. Services required because of significant changes in the project (not due to the design team's acts or omissions) including, but not limited to, size, quality, complexity, schedule, or the method for bidding and contracting for construction.
22. Processing change requests for Owner requested changes, and for unforeseen site conditions, after bid, including revisions to Contract Documents, processing approval of revisions through the Bui lding Department, and Chan ge Order negotiation.
23. Providing services in conjunction with implementing substitutions proposed by the Contractor and making subsequent revisions to Contract Documents resulting from such.
24. Providing services made necessary by the default of the Contractor , by maj or deficiencies in the work of the Cont ractor, or by failure of performance of either the Owner or the Contractor under the Contract for Construction.
25. Providing services in conjunction with arbitration proceedings or legal proceedings, except where the Architect is a party to such proceedings.
26. Providing "Special Inspection" services required by law or the Contract Documents.
27. Preparation of documentation to process the project through the US Green Building Council as a LEED project.
28. Design of photo-voltaic electrical generation systems.
29. Plan check and permit fees are not included and are to be paid by the City.
30. Anticipated Reimbursable Expense s for travel, delivery, printing and reproduction costs have been included in the proposed fee. Expenses will be billed as they are accrued at a rate of 1.15 times the expense.
EXHIBIT B
54 Marina Aquatic & Sports Center
September 23, 2022
6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177
We propose to provide the stated basic services on an hourly time and materials basis not to exceed a fee of One Million Seven Hundred Seventy-Two Thousand Dollars ($1,772,000.00). Invoices will be subm itted monthly for the hours of work accrued during the month on any particular phase.
The breakdown for the proposed services is as follows:
PREVIOUS UPDATED CHANGE
Schematic Design Phase $ 154,200.00 $ 154,200.00 $ NA Supplemental Survey $ 7,900.00 $ 7,900.00 $ NA Design Development Phase $ 362,000.00 $ 362,000.00 $ NA Construction Documents Phase $ 293,400.00 $ 914,000.00 $ 620,600.00 Construction Administration Phase $ 84,500.00 $ 320,100.00 $ 235,600.00 Included Reimbursables $ 11,500.00 $ 13,800.00 $ 2,300.00 Total $ 913,500.00 $1,772,000.00 $ 858,500.00
All travel and reimbursable costs have been anticipated/included in this proposal and any additional terms are consistent with our as-needed contract.
Below we have listed potential services that could arise through the development of the project. We have estimated fees for these services if deemed necessary and directed by Owner to proceed:
Vehicular Access Point to 9th Street $ 18,500
Existing Sewer Main Relocation $ 15,000
Traffic Assessment(s) $ 4,500
We appreciate the opportunity to present this proposal and we are excited about the opportunity to continue to work with you on this project. If you have any questions regarding this proposal, please do not hesitate to contact me at (619) 698 -9177.
Respectfully,
Matt Kingdon
Principal
EXHIBIT B
55 19-Jul-22
Name Contact Information Comment Notes
(Mr.) Leslie Asher Phone: 530.386.4451
Email: [email protected]
From previous email correspondence with the City: Could the city include tennis courts in its plans for parks that it will develop in the roller rink/Dunes neighborhood? Might city-maintained tennis courts make the city more attractive to its current and potential residents? From workshop: I still hope that tennis courts will be part of the new park at the Dunes, as Terry Siegrist had suggested they'd be (in an email on March 20, 2021).
Terry Siegrist to L eslie Asher via email 3/20/2021: It was good tal
king to you and as promised I followed up on your request and am happy to report that the city park in its approved concept designs by the city council the park does have two multi use Tennis/Pickle Courts include as part of the park concept plan. It was further clarified in email correspondence that d
imensions would be painted on the court surfaces for both tennis and pickleball and nets would be connected to wenches for adjusting net heights (34" for pickleball, 36" for tennis). *Fields not in COAR's project scope*
Grace Silva-Santella Phon
e: 831.238.4286
Email: [email protected]
Roller skate activity inside Sports Center, what is 1) Cost to repaint lines where basketball & pickleball courts are inside Sports Center if damaged by roller skating; 2) How do you prevent "free loaders," non payers, from entering Aquatic Center & Sports Center through Sports Pavilion connector building; 3) Universal changing areas. Women are always waiting longer for toilet needs; 4) Bathroom facilities for Sports Pavilion. How do people use this facility and not use sports center bathrooms that require membership or
paid daily use to go inside. Are the bathroom needs of Pavilion users dependent on bathrooms in the open park area; 5) Where would food trucks park for large events; 6) Is there still an interest in roller hockey sports? If not, how can the pavilion be used for activities other than roller hockey. or should it be removed? Back of card has these words: sports pavilion & MBM
She
ila Baker Phone: 831.917.4191
Email: [email protected] No water hockey at all only skate + actual sports center. For our community!! Steve Parkes Phone: 831.238.1546
Email: [email protected]
Very interested in pickleball. I'm on the board for the Monterey Bay Pickleball Club. As you know it is a fast growing sport. Great exercise for seniors and great for personal interaction.
Delmar King Phone: 831.7472245
Email: [email protected] Great plan/Marina needs all it can get
N/A N/A
Overall everything looks good so far but what about some kind of outdoor field. There is no info really about the look and status of that despite one of the boards mentioning a multi use field but not showing it on the map. I understand it is a separate project but it would be beneficial to have that field built in conjunction with the rest of the facilities. The field at Marina Vista now for soccer is really the best option for youth soccer but is not ideal. I hope the multi-use field can progress quickly. *Fields not in COAR's project scope*
Karen Anderson Phon e: 510.672.0220
Email: [email protected]
Really cool concept plans for both old facilities! My quick calculation of the increase to my property taxes for a $50M bond is 10%:
$595k assess valuation; current prop. taxes of $6.6k/year; new increase looked to be $600 per year.
Mike Kennedy Phone: 408.569.9548
Email: [email protected] Will the existing equestrian trail on 9th Street be extended to the sports/aquatic center? Lisa Rike Phone: 238.0161
Email: [email protected] Love the zero depth pool. Looking forward to a pool I don't have to drive 20+ minutes to use with kids.
Rob Weisskirch Phone: 384.6443
Email: [email protected]
Please consider collaboration with CSUMB. The students can easily overrun the Marina Sports Center, given its newness. With the CSUMB gym/pool and montage nearby - Marina needs to consider how collaboration could enhance service provision and the structure. Parking needs greater attention to assure the inflow/outflow as families drop kids off. Integration with outdoor space and the adjacent accessible playground is critical. There does not appear to have accounted for that possibility. Are there additional plans for growth? How long will this serve Marina? Daniel Muñoz
Phone: 551.696.9748
Email: dan_muñ[email protected]
We need help with fields for our children now!! Soccer fields and we have never built a softball only field in the city!! Girls need a place to play softball!! *Fields not in COAR's project scope* Amanda and Daniel
Muñ
oz
Phone: 551.696.9748
Email: dan_muñ[email protected]
We were hoping to receive more information and details in regards to the sports fields that were considered in the original plans.
City and school districts fields within Marina are unsafe for our youth to play. We continue to lose our student athletes to other cities and if we want to continue to build our community, we need to invest in our youth! *Fields not in COAR's project scope*
Carrie Burley
Phone: 831.331.6484
Email: [email protected]
Would like to see local problems solved. Fields for leagues need to be settled before moving onto/ other projects. As soon as changes are made I would support other projects like sports and aquatic center for families. *Fields not in COAR's project scope* Myra M Maedo-Malaga Email: [email protected]
Ple
ase consider 4 pickleball courts in the new sports complex in Marina. My grandson Joel as a 4th grader was taught the sport of pickleball by his school teacher. His teacher elaborated on a lesson to his students: play pickleball with your grandparents and you will grow up with a spirit of joy, plus good will within your family stretching three generations.
Marina needs a sense of “Belonging “ and we can accomplish this goal thru pickleball.
July 19, 2022 Public Engagement Workshop Community Center Comments Marina Sports Aquatic Center
EXHIBIT C
56 Darius Rike Email: [email protected]
I attended the public information session on July 19th and liked what I saw. A couple comments. I like all the elements but would REALLY like to see the aquatic center get done more than anything else.
While Marina often does not have great weather for an outdoor pool it would be great if the aquatic center building could be constructed in a way that one side (downwind and toward green space) could be opened when the weather was nice to give the sense of an outdoor pool.
Email: [email protected]
It is exciting to see the plans for the Sports Center, Aquatic Center, and Connector Building. Here are a few remarks/suggestions:
•Connector Building: As stated by several attendees of the presentation in July, the design of the connector building is "underwhelming".
•Connector Building: Please reconsider the 2-story option because that would provide opportunities to offer seating with views looking into the pool and into the sports center. It would also make it possible to move the walking track to the 2nd story so that walkers can use it without "cross traffic".
•If a one-story connector building is the only option, I suggest opening it up with windows looking out, at least at the front of the building, and into the pool- and sports areas.
•Maybe there can be a bar where guests can purchase coffee or wine, and then take their drinks to seating areas with views of the pool or the sports center?
•Does anyone know whether part of the historic bar of the Fort Ord Officers' Club is still available? If l'm'not mistaken, the bar at "The General" at Demetra Restaurant came from that club and is only part of the longer original bar. That would be a beautiful reference to the history of this area and buildings.
•Connection between Connector Building and future Sports Park: Please provide raised paving to show that this is a PEDESTRIAN area. Move some of the parking spaces to make it even safer. Car drivers should be aware that pedestrians have the right of way in this "entrance area". Plant some more trees there (closer to the road). •Bicycle parking: Please provide lots of space for regular and electric bicycles. And potentially also electric scooters like the ones that were being offered at CSU MB and Marina before the pandemic. It might be good to add bicycle parking ALSO at the back entrance, make a safe connection with the bicycle path/ sidewalk on 9th Street for bicyclists and pedestrians. Same as suggested for the front: move 1-2 parking place, provide raised pavers to indicate it is a PEDESTRIAN area. •Outdoor seating area for cafe: decide whether it needs to be fenced off, to protect patio furniture, or can be open, maybe with fixed picnic tables & benches. The space East of the Aquatic Center will be out of the wind, at least most of the time, and will have sun - except on foggy days.
•Offer seating under that beautiful cypress tree at the corner of 9th Street/ 2nd Avenue. (I now notice that this accidentally has been labeled as "2nd Street").
•Install a couple of EV chargers in parking lot? This can "lure" electric car drivers from Highway 1 into Marina. The cafe in the sports center can be a good destination, plus the nearby Dunes shopping center. "Electrify America" offers 2 (or even 3) years of FREE charges to new non-Tesla EV owners. Our city should try to get those chargers! At the moment, Pacific Grove and Watsonville are the closest Electrify America charging stations. •Sports Center: please add ballroom- and line/square dancing to the programs.
Drawing comments:
- Widen sidewalks along eastern edges of building, push parking more east, and add street trees
- Add glass for views on eastern portion of connector building Liesbeth Visscher
EXHIBIT C
57 September 28, 2022 Item No. 11b
Honorable Mayor and Members City Council Meeting of the Marina City Council of October 6, 2022
CITY COUNCIL TO CONSIDER ADOPTING RESOLUTION NO. 202 2-, APPROVING AMENDMENT NO. 2 TO THE ON-CALL
ARCHITECTURAL SERVICES AGREEMENT BETWEEN THE CITY OF
MARINA AND JEFF KATZ ARCHITECTURE TO CHANGE THE FIRM
NAME FROM JEFF KATZ ARCHITECTURE TO COAR DESIGN GROUP,
TO INCREASE THE ANNUAL CONTRACT LIMIT AMOUNT TO $2,000,000 FOR FISCAL YEAR 2022-2023, AND AUTHORIZING THE CITY MANAGER TO
EXECUTE THE AMENDMENT ON BEHALF OF THE CITY SUBJECT TO
FINAL REVIEW AND APPROVAL BY THE CITY ATTORNEY.
REQUEST:
It is requested that the City Council consider adopting Resolution No. 2022- for the following actions:
1. Approving Amendment No. 2 to the On-Call Architectural Services agreement between the City of Marina and Jeff Katz Architecture (JKA) changing the name of the firm from Jeff Katz Architecture (JKA) to COAR Design Group and increasing the annual contract limit amount to $2,000,000 for fiscal year 2022-2023 (Exhibit A); and
2. Authorizing the City Manager to execute the amendment on behalf of the City subject to final review and approval by the City Attorney.
BACKGROUND:
On November 16, 2021, the City Council adopted Resolution No. 2021-119, approving the final 2021-22 & 2022-23 Budget. Included in the Capital Improvement Program (CIP) portion of the budget was an allocation of $3,500,000 in blight escrow bond funding to re develop the sports center building on the former Fort Ord.
On July 7, 202 1, the City Council passed Resolution No. 2020 -79, approving a professional services agreement between the City of Marina and Jeff Katz Architecture for a period of two years with an annual contract limit amount of $300,000.00 for Architectural Services for execution of CIP projects.
On December 2, 2021, the City entered into an agreement with the Jeff Katz Architecture to provide on-call architecture services associated with various City projects.
On December 14, 2021, the City Council received a presentation on the Sports Center including options to include roller sports in the programmed facilities. City Council directed staff to begin design of the Sports Center, Aquatic Center, and an outdoor Sports Pavilion.
The City received a cost proposal for the architectural design, bidding document preparation, and architectural support during construction for the Sports Center Building Rehabilitation Project in the amount of $ 913,500. The JKA proposal also includes schematic design and design development to a 30% level for the Aquatic Center and outdoor Sports Pavilion. 1 1
On March 15, 2022, the City Council passed Resolution 2022-14 for the approval of Amendment No 1 to the On -Call Architectural Services agreement between the City and JKA increasing the annual contract limit to $900,000.00 for fiscal year 2022-2023.
Service Orders were issued to JKA for architectural design, bidding document preparation, and architectural support during construction for the Sports Center Building Rehabilitation Project and schematic design and design development to a 30% level for the Aquatic Center and outdoor Sports Pavilion.
ANALYSIS:
On September 23, 2022 the City received a letter from JKA regarding the company name change to COAR Design Group (see EXHIBIT B).
The rehabilitation of the existing Sports Center and Aquatic Center and construction of a new Connector Building is proposed to be named City of Marina Sports Complex Phase 1 Project.
An agenda item on this October 6th, 2022, Council meeting is for the approval of expanded architectural and professional services and approval of COAR ’s cost proposal of $858,500, EXHIBIT B. The expanded architectural and professional services include architectural design to 100% level, prepare bidding documents and architectural support services during construction for the Aquatic Center and Connector building and associated site work.
The total contract amount for architectural and professional services with COAR is for a time and material not to exceed $1,772.000 for the scope of work which includes design to 100%, prepare bidding documents and architectural support services during construction for the City of Marina Sports Complex Phase 1 Project and schematic and design development to 30% level for outdoor Sports Pavilion.
Currently, the approved annual contract limit for the On-Call Architectural Services between the City of Marina and JKA (currently named COAR) is $900,000 and is not sufficient to issue Service Orders for the full scope of the proposed architectural and professional services for the additional work.
COAR has the experience to provide architectural services including design, bid document preparation and architectural support services during construction. They are familiar with the project and have provided design concepts and financial feasibility studies for the Sports Center as well as the Aquatic Center. Amending the COAR contract is a time and cost-efficient way for the City to deliver the City of Marina Sports Complex Phase 1 Project and concept design for the outdoor Sports Pavilion.
Approval of this request allows the issuance of a service order to COAR for expanded architectural and professional services for the Aquatic Center, and Connector building.
The majority of the COAR work will occur during Fiscal Year 2022-2023. Increasing the annual compensation limit for the on-call architectural services agreement with COAR to $2,000,000 for this fiscal year will allow for completion of construction and bidding documents for the City of Marina Sports Complex Phase 1 Project.
FISCAL IMPACT:
Sufficient funding is allocated and available within the approved CIP budget to cover the full scope of the proposed architectural and professional services for City of Marina Sports Complex Phase 1 Project.
2 2
CONCLUSION:
This request is submitted for City Council consideration and action.
Respectfully submitted,
Elvie Morla-Camacho, P.E., QSD
Project Management Services
Wallace Group
REVIEWED/CONCUR:
Brian McMinn, P.E., P.L.S.
Public Works Director/City Engineer
City of Marina
Layne P. Long
City Manager
City of Marina
3 3
RESOLUTION NO. 2022-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA APPROVING AMENDMENT NO. 2 TO THE ON-CALL ARCHITECTURAL SERVICES AGREEMENT
BETWEEN THE CITY OF MARINA AND JEFF KATZ ARCHITECTURE TO CHANGE
THE FIRM NAME FROM JEFF KATZ ARCHITECTURE TO COAR DESIGN GROUP, TO INCREASE THE ANNUAL CONTRACT LIMIT AMOUNT TO $2,000,000 FOR FISCAL YEAR 2022-2023 AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE
AMENDMENT ON BEHALF OF THE CITY SUBJECT TO FINAL REVIEW AND APPROVAL BY THE CITY ATTORNEY.
WHEREAS, o n November 16, 2021, the City Council adopted Resolution No. 2021 -119, approving the final 2021 -22 & 2022 -23 Budget. Included in the Capit al Improvement Program (CIP) portion of the budget was an allocation of $3,500,000 in blight escrow bond funding to redevelop the sports center building on the former Fort Ord; and
WHEREAS, o n July 7, 2021, the City Council passed Resolution No. 2020 -79, approving a professional services agreement between the City of Marina and Jeff Katz Architecture with an annual limit amount of $300,000.00 for Architectural Services for projects in the CIP; and
WHEREAS, on December 2, 2021, the City entered into an agr eement with the Jeff Katz Architecture to provide on-call architecture services associated with various City projects.
WHEREAS, on December 14, 2021, the City Council received a presentation on the Sports Center including options to include roller sports in the programmed facilities. City Council directed staff to begin design of the Sports Center, Aquatic Center, and an outdoor Sports Pavilion; and
WHEREAS, t he City received a cost proposal for the architectural design, bidding document preparation, and architectural support during construction for the Sports Center Building Rehabilitation Project in the amount of $913,500. The JKA proposal also schematic design and design development to a 30% level for the Aquatic Center and outdoor Sports Pavilion; and
WHEREAS, the annual contract limit for the On -Call Architectural Services between the City of Marina and JKA is $300,000 and is not sufficient to issue Service Orders for full scope of the proposed architectural services for the Sports Center Building Rehabilitation Project; and
WHEREAS, the City Council passed Resolution 2022-14 for the approval of Amendment No 1 to the On-Call Architectural Services agreement between the City and JKA increasing the annual contract limit to $900,000.00 for fiscal year 2022-2023; and
WHEREAS, Service Orders were issued to JKA for architectural design, bidding document preparation, and architectural support during construction for the Sports Center Building Rehabilitation Project and schematic design and design development to a 30% level for the Aquatic Center and outdoor Sports Pavilion; and
WHEREAS, on September 23, 2022 the City received letter from JKA regarding the company name change to COAR Design Group; and
WHEREAS, an agenda item on this October 6th, 2022 City Council meeting is for the approval of expanded architectural and professional services and approval of COAR’s cost proposal of $858,500 for total contract amount of $1,772.000 ( time and material not to exceed) for the scope of work which includes design to 100% level, prepare bidding documents and architectural support services during construction for the City of Marina Sports Complex Phase 1 Project and schematic and design development to 30% level for outdoor Sports Pavilion; and
4 4
Resolution No. 2022-
Page Two
WHEREAS, approval of this request allows the issuance of a service order to COAR for the expanded architectural and professional services for the Aquatic Center, and Connector building; architectural building and site design to 100% level, prepare bidding documents and architectural support services during construction; and
NOW, THEREFORE, BE IT RESOLVED that the Council of the City of Marina does hereby adopt Resolution No. 2022- for the following actions:
1. Approving Amendment No. 2 to the On-Call Architectural Services agreement between the City of Marina and Jeff Katz Architecture (JKA) changing the name of the firm from Jeff Katz Architecture (JKA) to COAR Design Group and increasing the annual contract limit amount to $2,000,000 for fiscal year 2022-2023 (Exhibit A); and
2. Authorizing the City Manager to execute the amendment on behalf of the City subject to final review and approval by the City Attorney.
PASSED AND ADOPTED by the City Council of the City of Marina at a regular meeting duly held on the 6th day of October 2022, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
Bruce C. Delgado, Mayor
ATTEST:
Anita Sharp, Deputy City Clerk
5 5
AMENDMENT No. 2 TO AGREEMENT
BETWEEN CITY OF MARINA AND COAR
DESIGN GROUP FOR ON-CALL
ARCHITECTURE SERVICES
THIS AMENDMENT No. 2 (“Amendment 2”) to the Agreement for On-Call Architecture Services pertaining to various City projects and to provide on-call support services for the City on an as-needed basis as determined by the City Engineer is made this day _____________, 2022, by and between the City of Marina, a California charter city ("CITY") and COAR Design Group, a California Corporation ("CONTRACTOR"). CITY and CONTRACTOR are sometimes referred to herein collectively as the "Parties." Recitals
A. On December 2, 2021, CITY and CONTRACTOR entered into the Agreement for On- Call Architecture Services (the "Agreement") for services to provide architectural services pertaining to various City projects and to provide on-call support services for the City on an as-needed basis as determined by the City Engineer. The term of the Agreement ends on June 30, 2024, and compensation to the Contractor under the Agreement was limited to $300,000 per fiscal year.
B. On March 22, 2022, Amendment no. 1 was issued to increase the total annual compensation limit for fiscal (FY) 202 2-2023 to $900,000. In the First Amendment, Section (a) of the Article 3 “Compensation” from the Agreement were deleted and replaced to increase the compensation cap into $900,000 for FY 2022-2023.
C. The Agreement provides it may only be amended or modified by written agreement of the Parties. Both Parties now desire to amend the Agreement t o increase the total annual compensation cap for FY2022-2023 to provide additional compensation for the on-call architectural services associated with various City projects described generally by Exhibit A of the Agreement- Consultant shall provide services pertaining to city projects and shall perform standby and support services for City as determined by the City Engineer.
C. Only the numbered Articles of the Agreement which are being amended are set forth in this Second Amendment.
Terms & Conditions Amended
Now, therefore, the Parties agree to amend the Agre ement and Amendment no. 1 as follows:
1. Jeff Katz Architecture “Contractor” is changed to COAR Design Group “Contractor”
2. Article 3 “Compensation” Section (a) is deleted and replaced to read its entirety:
"City liability for compensation to Contractor under this Agreement, as amended, shall only be to the extent of the present appropriation to fund this Agreement. For services to be provided under this Agreement City shall compensate Contractor in accordance with the provisions of this Section and the hourly rate(s) and re imbursable schedule(s) attached hereto as Exhibit B and incorporated herein by this reference. The total annual compensation under this Agreement as amended shall be limited to: (1) Three hundred Thousand ($300,000) for the period December 2, 2021 to June 30, 2022, FY 2021-2022; (2) Two Million Dollars ($2,000,000) for the period July
EXHIBIT A
6
1, 2022 to June 30, 2023 , FY 2022-2023; (3) On July 1, 2023 and continuing for the remaining term of this Agreement the total amount of compensation under this Agreement as amended shall be limited to Three Hundred Thousand Dollars ($300,000) per fiscal year. All fiscal years commence on July 1 and end on June 30 and compensation during any portion of a fiscal year shall be prorated. For purposes of calculating and pro -rating compensation due each fiscal year shall be considered to have 365 days."
All other terms and conditions of the Agreement shall remain in full force and effect.
This Second Amendment may be executed in two (2) counterparts, each of which shall be deemed an original, but both of which together shall constitute one and the same instrument.
Counterpart may be delivered by facsimile, electronic mail (including pdf. or any electronic signature complying with the U.S.ESIGN Act of 2000, California’s Uniform Electr onic Transactions Act (Cal. Civil Code 1633.1 et seq.) or other applicable law) or other transmission method and any counterpart so delivered shall be deemed to have been validly delivered and be valid and effective for all purposes. This Second Amendment consists of three (3) pages.
IN WITNESS WHEREOF, the Parties hereto have executed this First Amendment to the Agreement for CONTRACTOR to provide engineering and building permit services pertaining to City projects and development and to provide support services for the CITY on an as-needed basis as determined by the City Engineer on the date(s) and year written below.
CITY OF MARINA COAR Design Group, a California
Corporation
By: _________________________ By: _________________________ Layne Long Name:
City Manager Its:
Date: _________________ 2022 Date: _________________ 2022
ATTEST:
By: _________________________
Deputy City Clerk
APPROVED AS TO FORM:
By: _________________________
City Attorney
EXHIBIT A
7 6353 Del Cerro Blvd. San Diego, CA 92120 I www.coargroup.com I 619.698.9177 City of Marina
211 Hillcrest Avenue
Marina, CA 93933
September 23, 2022
RE: Name Change
To Whom it May Concern,
Jeff Katz Architectural Corporation has changed its name to COAR Design Group. There is no change to the ownership or the address just the corporate name, see updated W-9 included.
Jeff Katz
President
EXHIBIT B
8 September 28, 2022 Item No. 11c
Honorable Mayor and Members City Council Meeting
of the Marina City Council of October 6, 2022
CITY COUNCIL TO CONSIDER ADOPTING RESOLUTION NO. 20 20-,
RECEIVING A PRESENTATION ON THE SEA HAVEN P ARK PLAYGROUND, APPROVING THE ALLOCATION AND APPROPRIATION OF $650,000 FROM
THE PARK I MPACT FEE FUND FOR ENHANCED PLAYGROUND FEATURES
WHICH ARE BEYOND THE DEVELOPERS FUNDING COMMITMENT FOR THE
PARK AND PREVIOUSLY ALLOCATED PARK IMPACT FEE FUNDS ,
AUTHORIZING T HE C ITY MANAGER OR HIS DESIGNEE TO EXECUTE A
PURCHASE AND SALES AGREEMENT FOR THE PLAYGROUND EQUIPMENT
AND INSTALLATION, AND AUTHORIZING THE FINANCE D IRECTOR TO
MAKE NECESSARY ACCOUNTING AND BUDGETARY ENTRIES
REQUEST:
It is requested that the City Council:
1. Adopt Resolution No. 2022-, receiving a presentation on the Sea Haven Park playground; and
2. Approve the allocation and appropriation of $650,000 from the Park Impact Fee Fund for enhanced playground features which are beyond the developers funding co mmitment for the park and previously allocated Park Impact Fee funds; and
3. Authorize the City Manager or his desi gnee to execute a purchase and sales agreement for the playground equipment and installation (EXHIBIT A); and
4. Authorize the Finance Director to make necessary accounting and budgetary entries.
BACKGROUND:
The city commenced a park planning process for the park at Sea Haven, the park at The Dunes, Glorya Jean-Tate Park, and the Equestrian Center in 2018. An open house on parks design was held on November 13 th, 2018. At the open house, community members viewed plan sheets that showed the four existing parks and bubble diagrams contai ning elements identified in master plans. The participants also had a pallet of p ark amenities to select from for p ossible inclusion. S taff and the consultant team received input from 44 participants. The input was reviewed by staff and selection of elements were incorporated into draft conceptual parks plans for the park at The Dune s, Glorya Jean - Tate Park, and the Equestrian Center.
The four parks concept plans were presented to a joint Public Wo rks Commission and Recreation and Cultural Services Commission on February 21, 2019 . The Commissioners received the presentation, heard comments from the public, and made recommendations for changes.
The Sea Haven Park concept plan was presented to City Council on April 9, 2019. The City Council provided comments which were incorporated into the concept plan, which was presented on February 19, 2020, when it was approved by Resolution 2020-18 with the request that the addition of a second restroom be considered . Resolution 2020 -18 al so approved the allocation of $700,000 from Park Impact Fees to augment the project budget allowing for enhanced playground equipment.
The revised Sea Haven Park plan was presented to City Council on July 7, 2021. The City Council approved the Sea Haven Park plan with one restroom and pickleball courts by Resolution 202 1-82.
Resolution 2021-82 also approved the allocation of $ 400,000 from P ark Impact Fees to augment the project budget allowing for pickleball courts in the construction. 1 The Sea Haven Park playground sketch as attached ( EXHIBIT B) will be presented by staff, and the playground consultant.
ANALYSIS:
The overall park plan was approved by City Council through resolutions 2020-18 and 2021-82 with the design of the playground as the only outstanding approval. Staff worked with the landscape architect BEK Collective through the on -call landscape architect agreement to engage the public and obtain proposals from playground equipment companies. The playground equipment companies Miracle, Spec, and Kompan provided playground concept renderings in response to a request for proposals.
A meeting was held in the City Council Chambers o n December 8, 2021, for outreach to the Youth Commission. Based upon input form the youth, s wings and slides were the most popular equipment, rock climbing walls, tall structures like towers, bridges and nets were next in popularity.
On March 22, 2022, staff and the consultant met with Spec and Kompan , the two highest ranked proposers. Input from the youth outreach was presented to the proposers and direction was provided to revise their concept proposals.
On May 17, 2022, Staff and the consultant recei ved presentations of revised playground concepts by Spec and Kompan.
May 28-29 staff and the consultant toured San Francisco Bay area playground installations by SPEC and Kompan to assess playability and long-term maintenance.
The proposed playgrounds w ere evaluated by staff and the playground consultant . Kompan was selected based upon maintenance, durability, play value, challenging play, inclusive play, play variety, theme quality, and the experience of the Kompan team.
A public outreach open house was conducted on July 19, 2022. A second public outreach open house followed by presenta tions was conducted on July 20, 2022. The public was invited to attend and participate. There were 25 and 21 attendees of the community engagement and public presentati on, respectively. Given the suspension of commission meetings due to the pandemic, c urrent and former members of the Recreation and Cultural Services Commission and the Public Works Commission were also invited to participate.
Kompan incorporated input from staff, the consultant, and the community to prepare the final playground design (EXHIBIT B) recommended for approval.
FISCAL IMPACT:
The current estimate for construction of the playground and pic kleball courts and project budget shortfall are shown below.
Cost of play equipment, installation, and Freight $1,530,352 (per Exhibit A) City landscape architect consultant $66,500
Cost of pickleball courts $400,000
Total Estimated Cost $1,996,852
Developer playground budget $300,000
City playground budget $700,000
City pickleball budget $400,000
Total Budget $1,400,000
Budget Shortfall ($596,852)
2 Sea Haven, per the Development Agreement, is ob ligated to contribute up to $3 million for the construction of the park. The park per the concept plan w ill cost Sea Haven at least $3 million to construct. The development agreement anticipated that the cost of the park would be more than $3 million and does not preclude the City from contributing monies fr om park impact fees for addi tional park improvements. The Sea Haven developer has allocated $300,000 towards the playground.
Staff anticipated additional costs for the park playground and submitted an application for funding of $1,000,000 from the Clean California Lo cal Grant Program (CCLGP) in February of 2022. The California Department of Transportation (Caltrans) developed the CCLP through which approximately $296 million in funds will go to local communities to beautify and improve local streets and roads, tribal lands, parks, pathways, and transit centers to clean and enhance public sp aces. Unfortunately, the application did not result in a grant award to the City.
Staff is proposing that City Council allocate and appropriate $650,000 from Park Imp act Fees, which currently have a fund balance of over $6.3 million, for enhanced playground features which are beyond the developers funding commitment for the park and previously allocated Park Impact Fee f unds. The additional funding request is slight ly more than $50,000 above the projected budget shortfall to account for the current market of escalating costs. Allocation of the $650,000 will bring the total City contribution to $1. 75 million for enhanced playground features and pickleball courts. If approved by City Council, $650,000 in Park Impact Fees will be allocated to Capital Improvement Program project QLP2016.
Over the course of Se a Haven’s development, the developer will contribute an additional $7 million towards park impact fees which will be used in the development of other parks in the City.
CONCLUSION:
This request is submitted for City Council consideration.
Brian McMinn, P.E., P.L.S.
Public Works Director/City Engineer
City of Marina
REVIEWED/CONCUR:
Layne P. Long
City Manager
City of Marina
3 RESOLUTION NO. 2022-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA RECEIVING
A PRESENTATION ON THE SEA HAVEN PARK PLAYGROUND, APPROVING THE ALLOCATION AND APPROPRIATION OF $650,000 FROM THE PARK IMPACT FEE
FUND FOR ENHANCED PLAYGROUND FEATURES WHICH ARE BEYOND THE
DEVELOPERS FUNDING COMMITMENT FOR THE PARK AND PREVIOUSLY
ALLOCATED PARK IMPACT FEE FUNDS, AUTHORIZING THE CITY MANAGER
OR HIS DESIGNEE TO EXECUTE A PURCHASE AND SALES AGREEMENT FOR
THE PLAYGROUND EQUIPMENT AND INSTALLATION, AND AUTHORIZING
THE FINANCE DIRECTOR TO MAKE NECESSARY ACCOUNTING AND
BUDGETARY ENTRIES
WHEREAS, community members contributed to the preliminary parks plann ing process by participating in a public meeting held on November 13, 2018; and
WHEREAS, The Sea Haven developer prepared draft prelimi nary plans based upon input from the community, city staff, and stakeholder groups; and
WHEREAS, the Sea Haven Park concept plan was presented to a joint Public Wor ks Commission and Recreation and Cultural Services Commission on February 21, 2019; and
WHEREAS, the Sea Haven Park concept plan was presented to City Council on April 9, 2019 when City Council provided comments which were incorporated into the concept plan; and
WHEREAS, the revised concept plan was presented on February 19, 2020 wh en it was approve d by Resolution 2020-18 which also approved the allocation of $700,000 from Park Impact Fees to augment the project budget allowing for enhanced playground equipment; and
WHEREAS, the revised Sea Haven Park plan was presented to City Council on July 7, 2021. The City Council approved the Sea Haven Park plan wit h one restroom and pickleball courts by Resolution 2021-82. Resolution 2021 -82 also approved the allocation of $400,000 from Park Impact Fee s to augment the project budget allowing for pickleball courts in the construction; and
WHEREAS, staff worked with the landscape ar chitect BEK Collective through the on -call landscape architect agreement to engage the public and obtain proposals from play ground equipment companies.
The playground equipment companies Miracle, Spec, and Kompan provided playground concept renderings in response to a request for proposals; and
WHEREAS, a meeting was held in the City Council Chambers on December 8, 2021, for outreach to the Youth Commission. Based upon input form the youth, swings and slides were the most popular equipment, rock climbing walls, tall st ructures like towers, bridges and nets were next in popularity ; and
WHEREAS, on M ay 28 -29 staff and the cons ultant toured San Francisco Bay area playground installations by SPEC and Kompan to assess playability and long-term maintenance; and
WHEREAS, the proposed playgrounds were evaluated by staff and the playground consultant .
Kompan was selected based upon maintenance, durability, play value, challenging play, inclusive play, play variety, theme quality, and the experience of the Kompan team; and
4 Resolution No. 2022-
Page Two
WHEREAS, a public outreach open house was conducted on July 19, 2022. A second pub lic outreach open house follo wed by presentations was conducted on July 20, 2022. The public was invited to attend and participate. There were 25 and 21 attendees of the community engage ment and public presentation, respectively. Given the suspension of c ommission meetings due to the pandemic, current and former members of the Recreation and Cultural Services Commission and the Public Works Commission were also invited to participate; and
WHEREAS, the current estimate for construction of the playground an d pickleball courts exceeds the project budget by $596,852; and
WHEREAS, staff is proposing that City Council allocate and appropriate $650,000 from Park Impact Fees, which curre ntly have a fund balance of over $ 6.3 million, for enhanced playground featur es which are beyond the devel opers funding commitment for the park and previously allocated Park Impact Fee funds.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Marina that does hereby:
1. Receive a presentation on the Sea Haven Park playground; and
2. Approve the allo cation and appropriation of $650,000 from the Park Impact Fee Fund for enhanced playground features which are beyond the developers funding commitment for the park and previously allocated Park Impact Fee funds; and
3. Authorize the City Manager or his designee to execute a purchase and sales agreement for the playground equipment and installation (Exhibit A); and
4. Authorize the Finance Director to make necessary accounting and budgetary entries.
PASSED AND ADOPTED by the City Council of the City of Marina at a regular meeting duly held on the 6th day of October 2022, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
_________________________
Bruce C. Delgado, Mayor
ATTEST:
__________________________
Anita Sharp, Deputy City Clerk
5 City of Marina
211 Hillcrest Avenue
Layne Long
Marina, CA 93933
E-Mail
Sales Representative
[email protected]
Doris Harpain
Quote No.
Document Date
SP113597-3
07/12/2022
Sales Proposal
Phone No. 559-977-2656 / 800-426-9788
Expiration Date 09/10/2022
Project Name O6UJ9A003086 Sea Haven - Marina Heights
Customer No. 870253
E-Mail
Sales Support
Responsible [email protected]
Garrett Lane
No. Description Qty Unit Unit Price Discount % Net Price Equipment 5-12 (Area 1)
PCTG-KDS-
CUSTOM
Giants w/ Ramp and Skywalk 1 Pieces 596,040.00 45.00 327,822.00 200632
US-KOMPAN-
CUSTOM
CUSTOM - KNS8500326B 1 Pieces 630,000.00 40.00 378,000.00 **PENDING VARIANT**
COR203301-1112 CONE TWISTER INCLUSIVE 1 Pieces 20,270.00 30.00 14,189.00
LIGHT BLUE - IN-GROUND
US-IDS-CUSTOM IDS Sandstone Arch 1 Pieces 25,622.50 25,622.50 CB005
GXY935000-12 Starsurfer - Night Sky Blue 2 Pieces 7,060.00 30.00 9,884.00 In-ground 60cm
ELE400024-3717BL Spinner Bowl - Blue 2 Pieces 1,460.00 30.00 2,044.00 In-ground 90cm
Equipment 2-5 (Area 2)
US-KOMPAN-
CUSTOM
Custom Robinia Whale - KNS8200197 1 Pieces 81,000.00 40.00 48,600.00 **PENDING VARIANT**
NRO613-1001 Music Play Panel 2 - Untreated 1 Pieces 5,210.00 40.00 3,126.00 In-ground 100cm
Kompan California, Inc. | 22431 Antonio Parkway, Ste B160-426 | Rancho Santa Margarita, CA 92688 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)
EXHIBIT A
6 City of Marina
211 Hillcrest Avenue
Layne Long
Marina, CA 93933
E-Mail
Sales Representative
[email protected]
Doris Harpain
Quote No.
Document Date
SP113597-3
07/12/2022
Sales Proposal
Phone No. 559-977-2656 / 800-426-9788
Expiration Date 09/10/2022
Project Name O6UJ9A003086 Sea Haven - Marina Heights
Customer No. 870253
E-Mail
Sales Support
Responsible [email protected]
Garrett Lane
No. Description Qty Unit Unit Price Discount % Net Price ELE400158-3517F Junior Spica - Yellow 1 Pieces 1,780.00 35.00 1,157.00 In-ground 70cm
PCM103-0601 Dolphin - Dark Blue 1 Pieces 950.00 20.00 760.00 In-ground 60cm
M18701-12P Ocean Seesaw 1 Pieces 7,050.00 35.00 4,582.50 In-ground 60cm
PCM157-0203 Universal Carousel - Hpl Deck Plate 1 Pieces 13,710.00 40.00 8,226.00
In-ground 20cm
Equipment (Area 3)
NRO-CUSTOM NRO 4-BAY SWING, TREATED 1 Pieces 17,630.00 40.00 10,578.00 899348
2 Inf, 1 Duo, 2 Belt, 1 Basket
US-ADA-SWING
SEA5-12
ADA Swing Seat, 8' beam 5-12Y 1 Pieces 1,172.00 1,172.00 Yellow ADA Seat 8' beam w SS Chains
Kompan California, Inc. | 22431 Antonio Parkway, Ste B160-426 | Rancho Santa Margarita, CA 92688 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)
EXHIBIT A
7 City of Marina
211 Hillcrest Avenue
Layne Long
Marina, CA 93933
E-Mail
Sales Representative
[email protected]
Doris Harpain
Quote No.
Document Date
SP113597-3
07/12/2022
Sales Proposal
Phone No. 559-977-2656 / 800-426-9788
Expiration Date 09/10/2022
Project Name O6UJ9A003086 Sea Haven - Marina Heights
Customer No. 870253
E-Mail
Sales Support
Responsible [email protected]
Garrett Lane
No. Description Qty Unit Unit Price Discount % Net Price NRO879-0601 Zipline Start Platform - Untreated 2 Pieces 9,160.00 40.00 10,992.00 In-ground 60cm
NRO881-1001 Double Zipline, Sloped Space 1 Pieces 20,250.00 40.00 12,150.00 In-ground 100cm
MI026 CABLE WAY PULLER 1 Pieces 740.00 40.00 444.00
INSTALL SPECIAL Installation of Kompan Equipment 1 Pieces 227,166.67 227,166.67 FREIGHT Freight for Kompan Equipment 1 Pieces 110,592.55 110,592.55
EXTRA SALES
FREIGHT
Frieght for third party equipment 1 Pieces 3,100.00 3,100.00 IDS - CB005
US ROBINIA
SERVICE
Robinia Service Program included in sales price
Surfacing
US-SPT-PIP5050 SF PIP Surfacing as per CFH 50/50 / SF at PW 5,163 Sq. Feet 28.80 148,694.40 Provide & install 5163 SF of 4.25" TOTAL UNIFORM
thickness.
Wear layer to be 50% STANDARD COLOR* / 50%
BLACK mixed with standard aromatic resin.
Includes graphics pattern per provided colorized
drawing
US-CUSTOM-
SUBBASE
Supply and Install 5163 SF of Subbase at PW 1 Sq. Feet 17,938.46 10.00 16,144.61 Up to "4" inches Class AB Aggregate
US-CUSTOM-
SURFACING
Supply and Intall of EWF/FF at 12" 1 Sq. Feet 71,769.23 10.00 64,592.31 570 CY / 11382 SF
Kompan California, Inc. | 22431 Antonio Parkway, Ste B160-426 | Rancho Santa Margarita, CA 92688 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)
EXHIBIT A
8 City of Marina
211 Hillcrest Avenue
Layne Long
Marina, CA 93933
E-Mail
Sales Representative
[email protected]
Doris Harpain
Quote No.
Document Date
SP113597-3
07/12/2022
Sales Proposal
Phone No. 559-977-2656 / 800-426-9788
Expiration Date 09/10/2022
Project Name O6UJ9A003086 Sea Haven - Marina Heights
Customer No. 870253
E-Mail
Sales Support
Responsible [email protected]
Garrett Lane
No. Description Qty Unit Unit Price Discount % Net Price Notes
Please read attached General Assumptions and
Exclusion document for information on
Install/Sitework.
All sitework, concrete and excavation to be
done by others prior to installation
Equipment is as per Site Plan L1.0 6/10/22
Please allow 26-28 weeks for product delivery upon
order placement
Description Net PriceDiscountRetail PriceQty
No. of Products 20
Subtotal - Products 859,349.00597,435.501,456,784.50
Subtotal - Surfacing 213,286.71220,463.63 7,176.92
Subtotal - Installation 243,311.28245,105.13 1,793.85
Subtotal - Freight 110,592.55110,592.55
Total USD Excl. Tax 1,429,639.54
Estimated Tax rate 100,712.18
Total USD Incl. Tax 1,530,351.72
Payment Terms 50% Prepayment, 50% Net 30 days
Kompan California, Inc. | 22431 Antonio Parkway, Ste B160-426 | Rancho Santa Margarita, CA 92688 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)
EXHIBIT A
9 City of Marina
211 Hillcrest Avenue
Layne Long
Marina, CA 93933
E-Mail
Sales Representative
[email protected]
Doris Harpain
Quote No.
Document Date
SP113597-3
07/12/2022
Sales Proposal
Phone No. 559-977-2656 / 800-426-9788
Expiration Date 09/10/2022
Project Name O6UJ9A003086 Sea Haven - Marina Heights
Customer No. 870253
E-Mail
Sales Support
Responsible [email protected]
Garrett Lane
Installation Site Address
Sea Haven Park
Imjin Parkway
Marina, CA 93933
Note that the color and texture of products and surfacing made with recycled content are subjected by the differences from the used recycled raw materials. Therefore, minor differences in the appearance and texture can occur.
Applicable sales tax will be added unless a valid tax exemption certificate is provided. This amount is only an estimate of your tax liability.
Your acceptance of this proposal constitutes a valid order request and includes acceptance of terms and conditions contained within the Master Agreement, which is hereby acknowledged.
Acceptance of this proposal from KOMPAN is acknowledged by issuance of an order confirmation by an authorized KOMPAN representative.
Prices in this quotation are good until expiration date, shown in the top of this document. After that date, this proposal may be withdrawn.
KOMPAN Products are "Buy American" qualified, and compliant with the Buy American Act of 1933 and the "Buy American" provision of ARRA of 2009.
Prevailing Wage and Payment & Performance Bonds are not included unless stated in body of Sales Proposal. If Payment & Performance Bonds are needed, add 2.2% of the entire sales proposal.
KOMPAN Authorized Signature:
Accepted By (signature): __________________________________________________ Accepted By (please print): _______________________________________________ Date: __________________________________________________ Kompan California, Inc. | 22431 Antonio Parkway, Ste B160-426 | Rancho Santa Margarita, CA 92688 | USA | Phone No. 1-800-426-9788 E-Mail [email protected] | www.KOMPAN.us
SWIFT Code NDEAUS3N (Nordea Bank, NY | Bank Account No. USD 718 155 3001 | Routing No. 026010786)
EXHIBIT A
10 INITIAL SKETCH
Please note: this is a sketch.
This design will need to go through a detailed design phase for the final design. Design approval documentation will be provided by KOMPAN Design Studio to be signed by the end client or Sales Team prior to the order being placed.
KNS8500326C+PCTG200715
Created 23.9.2022
Designer FreDed, HanMik, MatPiz
EXHIBIT B
11 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Designentwurf
Bitte beachten Sie, dass es sich hierbei um einen Entwurf handelt.
Dieser Entwurf muss noch eine ausführliche Entwicklungsphase durchlaufen, bevor das finale Design feststeht.
Die Dokumentation für die Designfreigabe wird vom KOMPAN Design Studio zur Verfügung gestellt und muss vor der Bestellung vom Endkunden oder dem Vertriebsteam unterzeichnet werden.
Diseño provisional
Tenga en cuenta que esta es una versión provisional.
Esta versión deberá superar un minucioso proceso de diseño antes de tener lista la versión final.
KOMPAN Design Studio aportará la documentación de aprobación del diseño, que el cliente final o el equipo comercial deberán firmar antes de hacer el pedido.
Conception de croquis
Veuillez noter qu’il s’agit d’un croquis.
Ce modèle devra passer par une phase de conception détaillée avant que le modèle final ne soit prêt.
La documentation d’approbation de la conception sera fournie par KOMPAN Design Studio et doit être signée par le client final ou l’équipe des ventes avant que la commande ne soit passée.
设计草图
请注意,此为设计草图。
此设计仍需进一步完善,并非最终设计。
设计审批文件将由 KOMPAN Design Studio 提供,经最终客户或销售团队签字后方可下单。
EXHIBIT B
12 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Design
KNS8500326C
PCTG200715
Age-group: 4–12 years
Safety standard: ASTM
Footing: Inground
EXHIBIT B
13 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Design
Age-group: 4–12 years
Safety standard: ASTM
Footing: Inground
KNS8500326C
PCTG200715
EXHIBIT B
14 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Design
EXHIBIT B
15 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Design
EXHIBIT B
16 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Activities
Tube slide1.
1. Custom graphic
2. 2.
Custom HDPE panels
3. 3.
EXHIBIT B
17 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Activities
Spacenet4.
4. Membrane balls5.
5. Wheelchair ramp6. 6.
Climbing net twisted7.
7. EXHIBIT B
18 PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Max. fall height: 284 cm / 9’–4”
Total height: 910 cm / 29’–10”
Main Dimensions
EXHIBIT B
19 81'-5" [2483cm]
82'-0" [2500cm]
93'-2" [2840cm]
93'-9" [2856cm]
11'-4" [105048]
6'-0" [55778]
6'-0" [55778]
6'-0" [55982]
PLEASE NOTE: THIS IS A SKETCH
INITIAL SKETCH KOMPAN Design Studio
Copyright 2022 KOMPAN A/S, all rights reserved.
KNS8500326C+PCTG200715
Safety zone area: 531.8 m2 / 5 724 ft2
Max. fall height: 284 cm / 9’–4”
Main Dimensions
EXHIBIT B
20 Please note: this is a sketch.
This design will need to go through
a detailed design phase for the final design.
Design approval documentation will be
provided by KOMPAN Design Studio to be
signed by the end client or Sales Team prior
to the order being placed.
EXHIBIT B
21