Attach 3 - Construction Waste Management Plan and Compliance Documentation 2019 California Green Building Standards Code DRAFT 12-7-2021

Marysville City Council
January 4, 2022

Document
Attach 3 - Construction Waste Management Plan and Compliance Documentation 2019 California Green Building Standards Code DRAFT 12-7-2021
Meeting
January 4, 2022
Body
Marysville City Council
Pages
7
Original file
253 KB
Text extracted from the city's file for reading and search. Open the original on go.boarddocs.com. That file is the official record.

12-7-2021

Page 1 of 7 ends

Construction Waste Management Plan and Compliance Documentation California Green Building Standards Code (CALGreen)
Pursuant to the 2019 California Green Building Standards Code (CALGreen), there is a requirement to provide for waste diversion and recycling of construction and demolition waste for construction projects subject to this Code.

Recycling Requirement Summary1:

Residential Construction - Recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition debris by weight, excavated soil and land-clearing debris excepted2.

Non-Residential Construction - Recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition debris by weight, excavated soil and land-clearing debris excepted2
.

Notes for both Residential and Non-Residential Construction - Please note that these requirements apply to the entire project, including any construction and demolition debris generated, handled or hauled by subcontractor(s). Hauler transactions at transfer stations, processing facilities and landfills are regularly reviewed through the California Recycling and Disposal Reporting System (RDRS).

Preparation and submittal of the Construction Waste Management Plan for approval; implementation of the Construction Waste Management Plan; and, completion and submittal of the Construction Waste Management Plan Compliance Documentation:

Step 1: Advance contact with waste haulers, construction clean-up companies and recyclers is a critical step to ensure that adequate provisions are made for both the diversion of construction and demolition debris materials from landfilling and the documentation of that diversion. Recology Yuba-Sutter is the franchised waste hauler for ______ County (or City of _____) and provides debris boxes for the separate collection of green waste, wood, metal and dirt/asphalt/concrete at reduced rates and debris boxes for mixed construction and demolition debris at standard rates and will process this material for recovery and recycling.

Self-haul is limited to materials removed incidental to the construction or demolition service being performed by the contractor where the contractor uses its own Fixed Body Vehicle and employees, and no Drop Box Containers are used for the collection and transportation of such materials. “Drop Box Containers” means open-top containers with a typical capacity of eight (8) to forty (40) cubic yards that are serviced by a roll-off collection vehicle. “Fixed Body Vehicle” means any wheeled vehicle that does not rely on a Drop Box Container or other detachable container to collect, contain and transport material. Dump trucks are considered to be Fixed Body Vehicles.

Again, advance contact with Recology Yuba-Sutter’s Waste Zero Specialist at (530) 743- 6933 (or other entities) is a critical step that should be completed prior to submittal of the Construction Waste Management Plan.

Step 2: Develop and submit the Construction Waste Management Plan (see pages 3 and 4) for review and approval. (Include any jurisdiction bond-type related requirements here.) 1 For additional information, please refer to the 2019 California Green Building Standards Code, California Code of Regulations, Title 24, Part 11.
2 Excavated soil and land clearing debris includes trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing. For a phased project, such material may be stockpiled if permitted and pursuant to building permit conditions.
12-7-2021

Page 2 of 7 ends

Step 3: Implement the Construction Waste Management Plan, including reviewing the plan with the foreman for each subcontractor and completion of the Construction Waste Management Plan Acknowledgement form (see page 5) with the foreman for each subcontractor.

Step 4: Complete and submit the Construction Waste Management Plan Compliance Documentation (page 6) verifying recycling and/or salvage for reuse of the required minimum percentages of construction and demolition debris, plus supporting weight tickets, haul tickets and/or reports and a copy of the completed Construction Waste Management Plan Acknowledgement. (Include any possible penalties/consequences for non-compliance here.) 12-7-2021

Page 3 of 7 ends

Construction Waste Management Plan (Page 1 of 2)
Project Name:

Job Number:

Construction Company:

Project Manager:

Date and representative name of Recology Yuba-Sutter Waste Zero Specialist contacted:

Date and representative name of other recyclers and/or facilities contacted:

Initial applicable construction type and corresponding diversion requirement to be achieved:

Residential Construction - Recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition debris by weight, excavated soil and land clearing debris1 excepted .

Non-Residential Construction - Recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition debris by weight, excavated soil and land clearing debris1 excepted.

Initial if construction company understands that these requirements apply to the entire project, including any construction and demolition debris generated, handled or hauled by subcontractor(s).

Identify/describe construction methods to be employed to reduce the amount of waste generated.
1 Excavated soil and land clearing debris includes trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing. For a phased project, such material may be stockpiled if permitted and pursuant to building permit conditions.
12-7-2021

Page 4 of 7 ends

Construction Waste Management Plan (Page 2 of 2)
For each waste material type expected to be generated from this construction project, indicate the diversion plan (Commingled and Sorted Off Site or Source Separated On Site) and/or Disposal, if planned, and the projected diversion rate percentage:

CHECK BOXES FOR EACH

WASTE MATERIAL TYPE

EXPECTED TO BE

GENERATED

DIVERSION METHOD

DISPOSAL

PROJECTED

DIVERSION
RATE (%)
Commingled
and Sorted
Off Site
Source
Separated
On Site
 Asphalt    ______ %
 Concrete    ______ %
 Shotcrete    ______ %
 Soil    ______ %
 Rocks    ______ %
 Trees, stumps & vegetation    ______ %
 Metals    ______ %
 Wood    ______ %
 Rigid insulation    ______ %
 Fiberglass insulation    ______ %
 Acoustic ceiling tile    ______ %
 Gypsum drywall    ______ %
 Carpet/carpet pad    ______ %
 Plastic pipe    ______ %
 Plastic buckets    ______ %
 Plastic    ______ %
 Hardiplank siding and boards    ______ %
 Glass    ______ %
 Cardboard    ______ %
 Pallets    ______ %
 Job office trash, paper, &
glass, aluminum & plastic
beverage containers
   ______ %
 Other:    ______ %
 Other:    ______ %
 Other:    ______ %
 Other:    ______ %
 Other:    ______ %
 Other:    ______ %
12-7-2021

Page 5 of 7 ends

Construction Waste Management Plan Acknowledgment
Project Name:

Job Number:

Project Manager:

Waste Hauling Company:

Waste Hauling Facility(ies):

Construction Waste Management Plan Acknowledgment - The Foreman for each new subcontractor that comes on site is to receive a copy of the Construction Waste Management Plan and complete this Acknowledgment Form.

I have read the Construction Waste Management Plan for the project; I understand the goals of this plan and agree to follow the procedures described in this plan. Signed:

DATE

SUBCONTRACTOR

COMPANY NAME FOREMAN NAME SIGNATURE
12-7-2021

Page 6 of 7 ends

Construction Waste Management Plan Compliance Documentation Complete the following documentation worksheet and attach supporting weight tickets, haul tickets and/or reports and a copy of the completed Construction Waste Management Plan Acknowledgement form.

WASTE MATERIAL TYPES

DIVERSION METHOD

DISPOSED
Commingled and
Sorted Off Site
Source Separated
On Site
(pounds) (pounds) (pounds)
Commingled Construction Debris
(CND) Collected by Recology YubaSutter and Processed at:
____________________________
Commingled Construction Debris
(CND) Collected by Recology YubaSutter and Processed at:
____________________________
Asphalt
Concrete
Shotcrete
Soil
Rocks
Trees, stumps & vegetation
Metals
Wood
Rigid insulation
Fiberglass insulation
Acoustic ceiling tile
Gypsum drywall
Carpet/carpet pad
Plastic pipe
Plastic buckets
Plastic
Hardiplank siding and boards
Glass
Cardboard
Pallets
Job office trash, paper, & glass,
aluminum & plastic beverage
containers
Mixed Waste Disposal
Other:

Other:

Mixed Waste Disposal
12-7-2021

Page 7 of 7 ends

TOTAL