Proposal Amount $20,000.00
GOODWIN-COLE TENTS &
AWNINGS
8320 Belvedere Avenue
Sacramento, CA 95826
[email protected]
(916) 381-8888
For: Marysville Police Department
Job Address: 316 6th Street
Marysville, CA 95901
[email protected]
(530) 749-3957
Customer Signature:
Last Modified: 01/10/2024
FORM / PROPOSAL
Salesman/Customer Rep
Shane Pate
[email protected]
Job Id 2312-5189607-01 Proposal # 6004 Proposal Date 01/10/2024 Contractor license # 852624
# Type Name (Price / Unit) x Qty Line Total
1 MATERIALS Cantilever Style Awning ($14,000.00 / Units) x
1.00 $14,000.00
Description: Fabricate and install Cantilever style awning measuring 12' wide x 6' projection. The frame will be 16 gauge steel with an 8" profile and will be powder coated black. The metal roofing will be 26 gauge Sky Line Standing Seam, color matte black (bottom side of metal roofing standard color grey). The awning will have two (2) 1" round steel rods connecting back to building for support. Awning will mount approximately 120" from step grade to bottom of awning.
Fabricate and install Cantilever style awning measuring 112" x 60" x 60" x 60" x 60". The frame will be 16 gauge steel with an 8" profile and will be powder coated black. The metal roofing will be 26 gauge Sky Line Standing Seam, color matte black (bottom side of metal roofing standard color grey). The awning will have two (2) 3" round post's, powder coated black that will flange into existing concrete to help support the front of the awning @ approximately 8' Tall From Grade (no 1" rods to building on this awning).
Field measure required prior to production.
2 LABOR Installation ($4,985.00 / rate) x 1.00 $4,985.00 Description: Price includes rate for 2-man crew to install job.
Subtotal $18,985.00
Tax(Material) (7.25%) $1,015.00
Total $20,000.00
Note:
Terms50% deposit
Balance due upon completion
lifetime warranty on frame
lifetime warranty on ASC metal roofing
1 year installation warranty Goodwin-Cole
Engineered drawings not included in cost if required
Goodwin-Cole is not responsible for permitting if required Signature Date
1. CONSUMER NOTIFICATION: You are entitled to a completely filled in copy of this agreement, signed by both you and the contractor, before any work may be started.
2. CHANGE ORDER: Extra Work and Change Orders become part of the contract once the order is prepared in writing and signed by the parties prior to the commencement of any work covered by the scope of the extra work or change, the cost to be added or subtracted from the contract, and the effect the order will have on the schedule of progress payments.
3. Liability Insurance: COMMERCIAL GENERAL LIABILITY INSURANCE (CGL). Goodwin-Cole Company Inc. carries commercial general liability insurance written by Golden Eagle Insurance Corp. You may call the Golden Eagle Insurance Corp at 925-938-1141 to check the contractor's insurance coverage.
4. Workers Compensation Insurance: WORKERS COMPENSATION INSURANCE. “Goodwin-Cole Company Inc. carries workers compensation insurance for all employees.
5. RIGHT TO CURE: In the event that Owner alleges that some of the work is not or has been done correctly or timely, Owner shall give Goodwin-Cole Company Inc. a notice that Goodwin-Cole Company Inc. shall commence to cure the condition that the Owner has alleged is insufficient within ten working days.
6. LIQUIDATED DAMAGES: In as much as damages in the event of a breach by the buyer of and under this agreement are difficult to ascertain. It is understood and agreed that if the buyer shall fail to allow installation or accept merchandise buyer shall pay to seller forty percent (40%) of the cash sales price agreed to as liquidated damages. In the event suit is brought to enforce this contract, the prevailing party is entitled to reasonable attorney fees and court costs.
7. MECHANICS LIEN WARNING: Anyone who helps improve your property, but who is not paid, may record what is called a mechanics lien on your property. A mechanics lien is a claim, like a mortgage or home equity loan, made against your property and recorded with the county recorder. Even if you pay your contractor in full, unpaid subcontractors, suppliers and laborers who helped to improve your property may record mechanics liens and sue you in court to foreclose the lien. If a court finds the lien is valid, you could be forced to pay twice or have a court officer sell your home to pay the lien. Liens can also affect your credit. To preserve their right to record a lien, each subcontractor and material supplier must provide you with a document called a 20-day Preliminary Notice. This notice is not a lien. The purpose of the notice is to let you know that the person who sends you the notice has the right to record a lien on your Property if he or she is not paid. BE CAREFUL. The Preliminary Notice can be sent up to 20 days after the subcontractor starts work or the supplier provides material. This can be a big problem if you pay your contractor before you have received the Preliminary Notices. You will not get Preliminary Notices from your prime contractor of from laborers who work on your project. The law assumes that you already know they are improving your property.
8. PROTECT YOURSELF FROM LIENS: You can protect yourself from liens by getting a list from your contractor of all the subcontractors and material suppliers that work on your project. Find out from your contractor when these subcontractors started work and when these suppliers delivered goods or materials. Then wait 20 days, paying attention to the Preliminary Notices you receive.
9. PAY WITH JOINT CHECKS: One way to protect yourself is to pay with a joint check. When your contractor tells you, it is time to pay for the work of a subcontractor or a supplier who has provided you with a Preliminary Notice, write a joint check payable to both the contractor and the subcontractor or material supplier. For other ways to prevent liens visit CSLB's website at www.cslb.ca.gov or call CSLB at 1-800-321-2752. Remember, if you do nothing, you risk having a lien placed on your home. This can mean that you may have to pay twice or face the forced sale of your home to pay what you owe.
10. INFORMATION ABOUT THECONTRACTORSSTATELICENSE BOARD (CSLB): CSLB is the state consumer protection agency that licenses and regulates construction contractors. Contact CSLB for information about the licensed contractors you are considering, including information about disclosable complaints, disciplinary actions and civil judgments that are reported to CSLB. Use only licensed contractors. If you file a complaint against a licensed contractor within the legal deadline (usually four years), CSLB has authority to investigate the complaint. If you use an unlicensed contractor, CSLB may not be able to help you resolve your complaint. Your only remedy may be in civil court and you may be liable for damages arising out of any injuries to the unlicensed contractor or the unlicensed contractors’ employees. For more information: Visit CSLB website at www.cslb.ca.gov Call CSLB at 1-800-321-2752 Write CSLB at P.O. Box 26000, Sacramento, CA 95826
11. THREE-DAY RIGHT OF CANCEL: You, the buyer, have the right to cancel this contract within three business days. You may cancel by e-mailing, mailing, faxing or delivering a written notice to the contractor at the contractor's place of business by midnight of the third business day after you received a signed and dated copy of the contract that includes this notice. Include your name, your address and the date you received the signed copy of the contract and this notice. If you cancel, the contractor must return to you anything you paid within 10 days of receiving the notice of cancellation. For your part, you must make available to the contractor at your residence, in substantially as good condition as you received it, any goods delivered to you under this contract or sale. Or, you may, if you wish, comply with the contractor's instructions on how to return the goods at the contractor's expense and risk. If you do make the goods available to the contractor and the contractor does not pick them up within 20 days of the date of the notice of cancellation, you may keep them without any further obligation. If you fail to make the goods available to the contractor, or if you agree to return the goods to the contractor and fail to do so, then you remain liable for the performance of all obligations under the contract.
12. The law requires that the contractor give you a notice explaining your right to cancel. Initial the in the line if the contractor has given you a Notice of the Three-Day Right to Cancel.
Any alteration from the above specifications and corresponding Goodwin-Cole Authorized Signature:
price adjustment(if necesssary) will be made only at the Customer's request or approval. Completing the work in this Proposal at the time scheduled is contingent upon accidents or delays beyond our control. CCL# 852624
Signature Date
Note: This proposal may be withdrawn if not accepted
within 30
days.
Acceptance of Contract --- I am/we are aware of and agree to the contents of this proposal. You are authorized to do the work as specified in the proposal. I/we will make the payment set forth in this Contract at the time it is due. In event account must be referred to a third party for collection, I/we agree to pay all reasonable collection and/or attorney fees, as well as court costs incurred to effect collection. Payment will be made as outlined above. Both parties agree to a three day (3) right to cancel on all signed/dated contracts. Cancelling the project after 3 days may result in lost of deposit.
Customer Signature:
Signature Date
Date:
01/10/2024
Goodwin-Cole Tents & Awnings, Since 1888
Payment Terms:
Unless agreed upon in a separate agreement, all projects will require a deposit and final payment is due at the time of final installation.
Goodwin-Cole accepts the following payment:
Cash
Check
Credit Card* (Visa, MasterCard, Discover, American Express) Shade Sail Projects – For shade sail installations there will be 2 separate invoices. The first billing will be once the posts are installed and will be for 50% of the project. The second invoice will be upon final installation. Invoices will be due upon completion of each phase of the project.
Projects Requiring Frame Removal or Field Measurements – For projects that require a crew to remove existing awnings OR take measurements in the field, a progress payment of 25% of the labor amount on the contract may be required.
Permits and/or Engineering:
Unless otherwise stated in the contract, Goodwin-Cole is not responsible for permits or engineering should they be required. If permits or engineering is required, additional costs will be incurred.
I have read and agree to the terms listed above:
Signature Date