Cities Index.
Attachment 1 All Rite Roof Quote Annex

Marysville City Council
June 4, 2024

Document
Attachment 1 All Rite Roof Quote Annex
Meeting
June 4, 2024
Body
Marysville City Council
Original file
233 KB
Text extracted from the city's file for reading and search. Open the original on go.boarddocs.com. That file is the official record.

- Proposal
CA Lic. #714523
3020 Industrial Drive, Suite A
ALL RITE YUBA CITY, CA 95993
ROOFING INC. Phone (530) 749-7483 Fax (530) 673-5030

PROPOSAL SUBMITTED TO PHONE DATE
City of Marysville 5/10/2024

STREET JOB NAME
Attn: Jim Shaad 429 10th St. City Hall

CITY, STATE AND ZIP CODE JOB LOCATION
[email protected] Marysville.

DATE OF PLANS JOB PHONE
Ule Propose hereby to furnish material and labor complete in accordance with specifications below, for the sum of:

Commercial Building Re-roof (sloped and flat sections) dollars ($ 50,770.00 Payment to be made as follows:

Note: Additional layer of 1" ISO board $5,600.00
Note: No dump fees saves $1,200.00
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from specifications below involving Authorized Will Harris Dal: 202002512591-0700 Signature
extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our Note: This proposal may be control. Owner to carry fre. tornado and other necessary insurance. Our workers are fully covered 15 withdrawn by us if not accepted within days.
by Workman's Compensation Insurance.

We hearby submit specifications and estimates for:

A). Re-roof of commercial building (slope sections) using a Timberline Reflector Series High Definition laminated shingle.

Note: Access to building will be gained across lawn. Plywood will be laid over lawn for protection during re-roof process.

1. Carefully cover all landscape using lightweight tarps.

2. Tear off all composition shingles down to wood sheathing. Dispose of debris.

3. Carefully inspect all wood sheathing for signs of dry rot. Notify owner/agent should any exist. Replace all dry rot at an additional cost of $85.00 per man hour plus materials. (expect some) Approximately $3,000.00.

4. Replace all plumbing and exhaust flashings with new.

5. Furnish and install 5 low profile dormer vents to ensure proper ventilation.

6. Furnish and install a 15 Ib felt underlayment over entire roof area

7. Furnish and install metal nosing at all gable perimeters. (white or brown).

8. Furnish and install a Timberline High Definition Reflector Series shingle nailed not stapled over entire roof area.

9. Furnish and install Ridglass to all hip and ridge areas.

10. Seal and paint all metal flashings with matching paint.

11. Furnish and install pipe collars all 1 1/2" and 2" pipe's.

12. Clean up all debris caused by above work.

13. Guarantee all workmanship for 5 years.

14. All Rite Roofing Inc., carries workman's compensation and liability insurance.

15. All Rite Roofing Inc., will provide all permits and inspections required by the city or county. continued on page 2
"NOTICE TO OWNER"
(Section 7018,7019 - Contractors License Law)
Under the Mechanics Lien Law, any contractor, subcontractor, laborer, materialman or other person who helps to improve your property and is not paid for his labor, services or material, has a right to enforce his claim against your property. This means that, after a court hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid your contractor in full, if the subcontractor, laborer, or supplier remains unpaid.

Under the law, you may protect yourself against such claims by filing, before commencing such work of improvement, an original contract for the work of improvement or a modification thereof, in the office of the county recorder of the county where the property is situated and requiring that a contractor's payment bond be recorded in such office. Said bond shall be in an amount not less than fifty percent (50%) of the contract price and shall, in addition to any conditions for the performance of the contract, be conditioned for the payment in full of the claims of all persons furnishing labor, services, equipment or materials for the work described in said contract.

Signature
Acceptance of Proposal the above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above.

Date of Acceptance: Signature
Specifications Page No. 2 of 2
Pages
B). Re-roof of flat sections using a Single Ply TPO roof system.

1. Carefully cover all landscape using lightweight tarps.

2. Tear off all built-up roofing down to wood sheathing. Dispose of debris.

3. Carefully inspect all wood sheathing for signs of dry rot. Notify owner/agent should any exist. Replace all dry rot at an additional cost of $85.00 per man hour plus materials.

4. Furnish and install one layer of 1" Resista insulation board over entire roof system, mechanically fastened

5. Furnish and install clad metal at all perimeters.

6. Furnish and install 60 mil TPO roof system over entire roof area, mechanically fastened

7. Furnish and install new TPO pipe boots around all roof penetrations.

8. Clean up all debris caused by above work.

9. Guarantee all workmanship for 5 years.

10. All Rite Roofing Inc.,carries workman's compensation and liability insurance.

THIS PAGE BECOMES PART OF AND IN CONFORMANCE WITH PROPOSAL FOR:
429 10th St. Marysville
ALL RITE Job Name/No.

ROOFING INC. Date
Accepted by.
(Initials)
Sumitted by Date Accepted by_ Date
(Initials) (Initials)

← All documents from this meeting