455 University Ave. Suite 100  Sacramento, California 95825  Phone: (916) 456-4400  Fax: (916) 456-0253  Website: www.mbkengineers.com Water Resources  Flood Control  Water Rights DON TRIEU, P.E. FOUNDERS:

DARREN CORDOVA, P.E
NATHAN HERSHEY, P.E., P.L.S. ANGUS NORMAN MURRAY
LEE G. BERGFELD, P.E. 1913-1985
BEN TUSTISON, P.E. JOSEPH I. BURNS
THOMAS ENGLER, P.E., CFM 1926-2021
MICHAEL MONCRIEF, P.E. DONALD E. KIENLEN
NICOLE ORTEGA-JEWELL, PMP 1930-2023
KYLE KNUTSON, P.E.

ANNE WILLIAMS, P.E.

PATRICK HO, P.E.

August 26, 2025
Mr. Jim Schaad
City of Marysville
526 C Street
Marysville, CA 95901
Email: [email protected]
Subject: Scope of Work for Professional Consulting Services Marysville Ring Levee Accreditation and Certification Program City of Marysville, California
Dear Mr. Schaad:

This scope of work has been prepared to provide the cost for efforts associated with MBK Engineers’ (MBK) role in the Marysville Ring Levee Accreditation and Certification Program to ensure compliance with Federal and State requirements for project levees that provide flood protection for the City of Marysville (City). The scope of work, as described in this letter, shall provide Program Management, Hydraulic Modeling Support, and Civil Engineering Consultation to support Federal Emergency Management Agency (FEMA) certification requirements, as per Title 44 of the Code of Federal Regulations, Section 65.10 (44 CFR 65.10), to meet the 100-year base flood elevation; and the Urban Levee Design Criteria (ULDC) requirements, as per the 2007 California Senate Bill 5 (SB 5), to meet the 200-year Urban Level of Flood Protection for the Marysville Ring Levee.

This proposal contains a detailed scope of work and budget for MBK Engineers to provide services beginning in fiscal year 2026 and continuing through fiscal year 2027. An estimated fee for each of the recommended certification support consultants (HDR and MHM) is provided herein; however, each consultant shall provide a separate proposal with a detailed scope and fee summary and will enter contracts directly with the City. As a reference, the proposals are included in Appendix A.

In summary, the total estimated cost for the Marysville Ring Levee Accreditation and Certification effort for FEMA and ULDC is $923,713. A detailed cost breakdown is provided in Table 4, and Tables 5A and 5B.

Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 2

BACKGROUND
The City of Marysville is protected by the Marysville Ring Levee that is currently undergoing review, design, and construction by the U.S. Army Corps of Engineers (USACE). The Marysville Ring Levee Project is expected to provide at least a 200-year level of flood protection to the City upon its completion, at which time the City of Marysville intends to make a finding for the Urban Level of Flood Protection (ULOP) based on meeting the State of California’s Urban Levee Design Criteria (ULDC) standards. Most of the construction for the 200-year level of flood protection has been completed through design contracts led by USACE (Figure 1) while there are ongoing efforts that are necessary to complete the remaining improvements in reducing flood risk to the City of Marysville. The improvements have been or shall be completed to address underseepage, slope stability, freeboard, erosion, and other deficiencies to meet both FEMA and ULDC criteria. FEMA certification requires an Engineering certification that the project was designed and constructed to meet the 100-year base flood standards set forth in 44 CFR 65.10. The current condition of the Marysville Ring Levee is expected to meet FEMA criteria to secure levee accreditation that the levees will provide protection up to the 100-year base flood.

Figure 1. Marysville Ring Levee Map
Both FEMA and ULDC certification efforts require engineering evaluation and preparation of due diligence documentation to demonstrate that all applicable Federal and State criteria, respectively, are met for the Marysville Ring Levee. To achieve accreditation from FEMA, the levee system must meet the National Flood Insurance Program (NFIP) requirements (provided in Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 3
44 CFR 65.10) for the 100-year base flood elevation. The certification for ULDC is for the 200- year design water surface elevation (DWSE). Each of these certification efforts include the need to meet various design criteria by demonstration of applicable evaluation, design, and construction. The design criteria are shown in Table 1, Table 2, and Table 3.

Table 1. FEMA 44 CFR Section 65.10 Certification Criteria (b)(1). Freeboard* (b)(5). Settlement
(b)(2). Closures (with HDR) (b)(6). Interior Drainage
(b)(3). Embankment Protection (c). Operations Plans and Criteria (b)(4). Embankment and Foundation Stability (d). Maintenance Plans and Criteria *Note: In Tables 1 and 2, bold text indicates scope performed by MBK Engineers. Text in italics indicates the scope was performed by MHM. Non-bold and non-italic text indicate the scope shall be performed by HDR.

Table 2. ULDC Certification Criteria

7.1 Design Water Surface 7.11 Right of Way

7.2 Minimum Top of Levee 7.12 Encroachments

7.3 Soil Sampling, Testing, Logging 7.13 Penetrations (with HDR)

7.4 Slope Stability 7.14 Floodwalls, Retaining Wall, and Closure Structures (with HDR)

7.5 Seepage 7.15 Animal Burrows

7.6 Levee Loading 7.16 Levee Vegetation

7.7 Seismic Vulnerability 7.17 Wind Setup and Wave Runup*

7.8 Levee Geometry 7.18 Security

7.9 Interfaces and Transitions 7.19 Sea Level Rise

7.10 Erosion 7.20 Emergency Actions and Flood Safety Plans Note: In Tables 1 and 2, bold text indicates scope performed by MBK Engineers. Text in italics indicates the scope was performed by MHM. Non-bold and non-italic text indicate the scope shall be performed by HDR. * indicates analysis provided by USACE.

Table 3. Additional Documentation to Support FEMA and ULDC Certifications As-built/Record Drawings
Construction Documentation Report
Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 4

CONSULTANT TEAM AND APPROACH
MBK recommends the Consultant Team, listed below, for the FEMA/ULDC certification effort, which includes professional consulting firms with extensive knowledge and experience in the evaluation, design, and construction of the Marysville Ring Levee. MBK believes this team has the unique expertise to provide the required certification documentation.

MBK understands that USACE and Caltrans will not provide certification (FEMA or ULDC) for their design reaches.

The recommended Consultant Team has been assembled based on their collective knowledge and experience to certify the Marysville Ring Levee. The recommended Consultant Team and their responsibilities to provide FEMA/ULDC certification for the Marysville Ring Levee are as follows:
• MBK Engineers – Program Management, Hydraulic & Hydrologic modeling, certification of items outlined Tables 1 through 3, and preparation of the Engineer’s Report and supporting package. Evaluation and documentation related to topics including FEMA (b)(1) freeboard; and ULDC 7.1, 7.2, 7.6, and 7.19. • MHM – Evaluation and documentation related to topics including FEMA (b)(2) Closures, FEMA (b)(6) Interior Drainage; (c) Operations Plans and Criteria; and (d) Maintenance Plans and Criteria; and ULDC 7.11, 7.12, 7.13 (civil), 7.14 (civil), 7.15,

7.16, 7.18. and 7.20. Additionally, MHM will provide surveying services and obtain the necessary parcel and easement data to support ULDC 7.11 right-of-way evaluations.

HDR – Evaluation and documentation of geotechnical related topics including FEMA (b)(3) Embankment Protection; (b)(4) Embankment Foundation Stability and (b)(5) Settlement; and ULDC 7.3, 7.4, 7.5, 7.8, 7.9, and 7.10, in addition to ULDC 7.7 Seismic Vulnerability and Post Earthquake Remediation Plan, if necessary, and geotechnical input to 7.13, 7.14.

MBK ENGINEERS SCOPE OF WORK
Task 1: Program Management
MBK Engineers shall provide Program Management duties associated with supervising the Consultant Team in preparing the documentation required to meet the FEMA and ULDC certification processes. MBK will coordinate with the City of Marysville to track budget and schedule. The program is anticipated to be completed in approximately 2 years to complete the FEMA Letter of Map Revision (LOMR) submittal and 4 years to complete the ULDC Engineer’s Report to support ULOP. Documentation packages shall be prepared separately for FEMA and ULDC submittals as the required documentation becomes available, and as ongoing construction activities are completed. The schedule is discussed below.

Task 1 includes coordination with the City of Marysville, leading regularly scheduled team calls, preparation of meeting minutes, sharing agenda items, tracking milestones with other team Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 5
members responsible for their respective certification tasks, and reviewing the draft and final deliverables of the certification team.

MBK will coordinate the review process with an Independent Panel of Experts (IPE) as required for ULDC, and to be selected by the City of Marysville. Coordination includes assisting the City of Marysville with: (1) preparing the IPE’s role and responsibilities; (2) selection of each IPE member; (3) preparing scopes of work for each IPE; and (4) coordination with IPE to distribute work products, briefing meetings, and comment/response closeout. It should be noted that cost for the IPE panel is not included in this scope of work and each IPE member shall be contracted directly with the City of Marysville.

Task 2: FEMA and ULDC Certification Support
MBK Engineers shall provide Civil Engineering consultation services required to provide professional review and opinions related to the listed certification categories shown in Table 1 and Table 2:

Part 1: FEMA Evaluation
As defined in 44 CFR 65.10(a), “For purposes of the NFIP, FEMA will only recognize in its flood hazard and risk mapping effort those levee systems that meet, and continue to meet, minimum design, operation, and maintenance standards that are consistent with the level of protection sought through the comprehensive flood plain management criteria established by §

60.3, Flood plain management for flood-prone areas.” On behalf of the City of Marysville, MBK and the Certification Team will prepare, review, and certify all documentation necessary to demonstrate that the MRL meets the requirements to provide protection from the 100-year base flood and establish appropriate risk zone determinations for NFIP maps. MBK shall coordinate these efforts with the City’s floodplain manager who shall be designated as the LOMR applicant and point of contact with FEMA during the LOMR review process.

1. Review and Collection of Existing Documentation (Same as ULDC)

2. Prepare FEMA H&H
The FEMA evaluation for H&H consists of reviewing existing FEMA BFE hydrology and hydraulic submittals currently under review by FEMA for the Feather and Yuba Rivers. as well as subsequent analysis by others, to verify the calculations and to make a finding that the information contained in the reports meets the standard of care for FEMA certification. The effective hydraulics model will be requested from FEMA and shall be compared with current modeling efforts to ensure any changes to the base flood are evaluated. All other evaluations required to meet FEMA criteria shall use the revised base flood elevations to support their findings. As scoped, this task assumes that MBK Engineers is stamping the H&H for the package.

Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 6
The Interior Drainage tasks shall be completed, documented, and certified by MHM; MBK Engineers shall review all pertinent documentation.

The FEMA evaluation for H&H consists of:
• Reviewing existing hydrology and hydraulic models that have been submitted to FEMA and pending approval. MBK shall rely on previous modelling efforts for adjacent communities (i.e., Feather River for Sutter County, Yuba River for Yuba County) to compute the base flood elevations along the MRL. Hence, the effective hydraulics model for the study areas associated with the MRL will not be requested from FEMA. • Verifying base flood elevations and associated modelling already presented to FEMA to ensure assumptions, hydrology, and geometry reflect current conditions. • Establish tie-in locations between updated models and effective base flood elevations (i.e., within 0.5 vertical feet).
• Optional task: If required by FEMA, MBK will prepare a hydraulic model and provide base flood elevation results to reflect a theoretical condition of removing the levee segment upstream of MRL.
• All other evaluations required to meet FEMA criteria listed in 44 CFR 65.10 shall use the revised base flood elevations to support their findings. • The Interior Drainage tasks shall be completed, documented, and certified by others; MBK Engineers shall review all pertinent documentation.

3. Prepare LOMR Application Package
MBK will prepare the following documents, maps, and forms required to complete the LOMR application package:
• Project Narrative
• MT-2 application forms
• Certified work maps
• Annotated FIRMs
• 44 CFR 65.10 evaluation report to demonstrate the following FEMA design criteria are met based on documentation prepared by Certification Team:
o Freeboard per 65.10(b)(1)
o Closures per 65.10(b)(2)
o Embankment Protection per 65.10(b)(3)
o Embankment Foundation and Stability per 65.10(b)(4)
Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 7
o Settlement per 65.10(b)(5)
o Interior Drainage per 65.10(b)(6)
o Other Design Criteria upon request by FEMA per 65.10(b)(7) o Plans for Maintenance and Operations
• Public and property owner notifications
• Emergency Preparedness Plan

4. Coordination with FEMA
MBK shall assist the City in providing responses to questions and comments from FEMA upon their initial review of the LOMR application and subsequent reviews until the LOMR is approved. FEMA’s review process is iterative and may include multiple reviews and updates to submittals.

Part 2: ULDC Evaluation

7.1 and 7.19: Design Water Surface Elevation and Effects of Sea Level Rise – This task includes hydrologic and hydraulic modeling support for the ULDC Certification of the Marysville Ring Levee. A 200-year design water surface elevation (DWSE) will be prepared using hydrology provided by others and updating the hydraulic model to reflect current conditions for the levee system and adjustment in accordance with ULDC. Hydrology developed by USACE will be utilized for 200-year inflows for rivers, creeks, and tributaries.

Deliverables shall include:
• Computed WSE including ULDC DWSE, Hydraulic Top of Levee (HTOL), and Minimum Top of Levee (MTOL).
• Technical Memorandum providing a Draft and Revised Draft. • Comment response table for IPE review.

7.2 and 7.17: Minimum Top of Levee – Using MTOL, based on the DWSE computed per ULDC 7.1, the minimum freeboard of 3 feet, and any freeboard impacts due to wind and wave analysis under ULDC 7.17, a comparison will be made between the top of levee elevation of the levee and the computed MTOL. A memorandum will be prepared to demonstrate that the levee system meets MTOL. This task assumes the use of current top-of-levee elevations.

Deliverables shall include:
• Technical memorandum combined with ULDC 7.1 and 7.19. • Comment response table for IPE review.

Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 8

7.6: Levee Loading – DWR’s Urban Levee Evaluation (ULE) report indicates that the Marysville Ring Levee is infrequently loaded due to its location relative to the tidally influenced waterways. Therefore, MBK proposes to rely on the ULE report to conclude that the levees meet ULDC 7.6. However, because the ULE report fails to provide or reference the evaluation or analysis to support the conclusion that the levee is not a frequently loaded levee, the IPE may require a loading analysis be performed. In that case, data from stage gages along the Feather and Yuba rivers will be compiled to assess frequency of water against the system levees. Elevations and flow data may be transferred to the project site using hydraulic model simulations.

Deliverables shall include:
• Technical memorandum or standalone text in each levee system’s Engineer’s Report. • Comment response table, if technical memorandum is developed, for IPE review.

Task 3: Reporting
MBK Engineers will prepare two drafts (administrative and draft) and final Engineer's Reports that will support the FEMA and ULDC certification efforts. The Engineer’s Reports, separately prepared for FEMA and ULDC, are summaries of the substantial evidence record required to certify for FEMA and ULDC. Preparation of the Engineer’s Reports shall require input and review by the Consultant Team. MBK shall prepare the FEMA and ULDC certifications for each criterion which will be stamped by the appropriate California registered professional engineer.

Thomas Engler of MBK Engineers shall be the Engineer on record to certify the Engineer’s Report based on the compiled FEMA and ULDC certifications. The IPE shall review the Engineer’s Reports and certifications and provide comments. MBK shall manage the Consultant Team’s responses to IPE’s comments and modify the FEMA and ULDC Engineer’s Reports as appropriate.

The FEMA and ULDC reporting efforts are summarized as follows:
• Preparation of the FEMA Certification Report: This is a high-level report to summarize each due diligence report that specifically meets all of the FEMA criteria under 44 CFR

65.10. Each due diligence report and other supporting documentation will be included as appendices to the report. The certification report will include individual engineers’ opinions that will be stamped by the applicable team members for each specific FEMA criteria, and the report package will be stamped by the certifying engineer. • Preparation of the Emergency Preparedness Plan: Upon evaluation of the City’s existing emergency operation plans, FEMA requires an emergency preparedness plan to include the areas impacted by the levee system and procedures for emergency operations and public evacuation that shall meet the requirements of 44 CFR 65.10(c)(3). • Preparation of LOMR application submittals to FEMA. This is a digital submittal to FEMA and requires a fee payment of $9,000 for processing. The submittal includes all supporting documentation to demonstrate the levee systems meets 44 CFR 65.10, hydrologic and hydraulic models to support the revised base flood elevation, annotated Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 9
FIRM maps, certified working maps with updated terrain and survey data, as-built drawings, O&M manuals and supplemental documentation, MT-2 application forms, project narrative, and property owner notifications.
• Preparation of a due diligence report that supports MBK’s certification categories for ULDC.
• Preparation of the Urban Level of Flood Protection Engineer’s Report to meet ULDC requirements.
• Coordination with the design team to review and revise the due diligence reports and engineer’s summary reports.
• All deliverables include a draft report, revised draft, submittal to IPE, response to IPE comments, and a final report.

ESTIMATE OF COST
MBK Engineers’ efforts will be charged on an actual time-and-expense basis, billed at our 2025 rates, and shall be consistent with our previous and current contracts with the City of Marysville.

Table 4 shows the estimated cost for each certification effort:

Table 4. MBK Estimate per Certification Effort
Levee System FEMA ULDC
Marysville Ring Levee - 7.5 miles $ 160,000 $ 170,000
TOTAL $330,000
Our fee schedule is attached as Exhibit 3.

Tables 5a and 5b include costs provided by the recommended Consultant Team where each firm will provide its own scope of work and budget estimate separately from MBK’s efforts:

Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 10
Table 5a. Summary of Consultant Team Cost Estimate for Certification Effort Consultant FEMA ULDC Estimated Cost
HDR $ 102,283 $ 129,771 $ 232,054
MHM (total) $178,673 $137,986 $316,659
Internal Drainage Modeling (MHM) $150,000 N/A $150,000
Evaluation and Reporting (MHM) $28,673 $137,986 $166,659 MBK Engineers (total) $160,000 $170,000 $330,000
H&H Modeling (MBK) $52,000 $88,000 $140,000
Evaluation, Reporting, and Program
Management (MHM) $ 108,000 $ 82,000 $190,000
Estimated IPE Review N/A $45,000 $45,000
**TOTAL PROGRAM COST $ 440,956 $ 482,757 $ 923,713
**Note: The IPE should be contracted by the City and not be a subconsultant to MBK.

Table 5b. Summary of Certification Effort Cost by Scope FEMA ULDC Estimated Cost
Modeling $ 202,000 $ 88,000 $290,000
Report and Evaluation $208,956 $314,757 $523,713
Program Management $30,000 $35,000 $65,000
Estimated IPE Review N/A $45,000 $45,000
**TOTAL PROGRAM COST $ 440,956 $ 482,757 $ 923,713
The total estimated cost for the Marysville Ring Levee Certification effort for FEMA and ULDC by MBK Engineers and the Consultant Team is $923,713.

SCHEDULE
MBK Engineers’ efforts shall begin upon approval of this proposal. The work schedule for the proposed Consultant Team will be based on each consultant’s scope for certification.

An estimated schedule and total cost of certification deliverables year of completion is shown below. The schedule is based on a fiscal year July 1– June 30, shown in Table 6. This schedule is determined by the number of contracts currently under construction or scheduled for construction and assumes that certification can occur at most a year after construction is complete.

Table 6. Schedule of Certification by Fiscal Year
FEMA 2025-2027
ULDC 2025-2030
Mr. Jim Schaad August 26, 2025
Marysville Ring Levee Certification Page 11
Table 7. Remaining Construction Contracts by Basin
Marysville Ring Levee
Station 97+00 to 122+00
(Caltrans Finger Levee) 2025-2027
Station 235+50 to 237+15 (UPRR Gap) 2028-2030
Station 0+00 to 10+50 (North Area) 2028-2030

LIMITATIONS
The costs shown above are a best estimate given the information, schedule, and available data for a 2-year program. Changes to the schedule, completion of current USACE and local construction tasks and documentation, and other unforeseen items may require a modification to the program schedule and fee.

The level of effort in this scope is based on what needs to be done to submit the FEMA and ULDC certification packages. It is common for FEMA to have comments regarding submittals, and it remains uncertain how ULDC certification will be reviewed and approved by the State.

Comments from Federal and/or State agencies may require revisions to the package. Given the uncertainty over that level of effort, we have not budgeted for a round of revisions. We propose that the scope be amended, if necessary, based on the level of revisions needed to meet compliance.

Please contact Tom Engler or Rebecca Money at (916) 456-4400 if additional information or clarification is requested.

Sincerely,

MBK ENGINEERS
Tom Engler, PE
BM/oh
F:\3455_Marysville\3455-1 ULOP+FEMA\2025 ULDC_FEMA Proposal Attachments: 1. 2025 MBK Fee Schedule

2. HDR Scope and Fee

3. MHM Scope and Fee
My signature below authorizes MBK Engineers to proceed with the work described in this letter. __________________________________ ___________________________ Recipient Name: Date:

Attachment 1:
2025 MBK Fee Schedule
1/25
455 University Avenue, Suite 100  Sacramento, CA 95825  916/456-4400 (voice)  916/456-0253 (fax)

SCHEDULE OF FEES

1. Standard Fees:

Per Hour
Principal/Principal Engineer
Senior Consultant
$290–315
290–315
Supervising Engineer 230–300
Senior Project Manager 230–295
Senior Engineer
Project Manager
Project Accountant
180–260
170–240
140–200
Engineer/Hydrologist 140–200
GIS Professional 130–200
Water Resources Associate 110–200
Assistant Engineer 110–190
Assistant Surveyor 110–190
Prevailing Rate Surveyor, Chief of Party 227*
Prevailing Rate Surveyor, Rodman/Chainman 210*
GIS Specialist 90–170
Technician/Drafter 90–170
Junior Engineer 90–145
Engineering Aide 60–105
Technical Editor 70–150
3-Person Survey Crew 375
2-Person Survey Crew 315
*Subject to CA Department of Industrial Relations (DIR) wage determinations

2. Time spent in appearances at courts or quasi-judicial State or Federal boards and commissions is billed at $500 per hour for principals and supervising engineers, $450 per hour for registered engineer staff, and $300 per hour for other staff.

3. Automobile mileage is billed at the Federal reimbursement rate. Local mileage (less than 20 miles) will not be billed.

4. All other direct non-salary expense, including, but not limited to, transportation and subsistence, commercial printing, reproduction costs, and similar out-of-pocket expenses are billed at actual cost plus a service charge of 10%. Use of GPS equipment is billed at $60 per hour. Use of MBK owned boat will be billed at $200/day. Use of MBK owned drones will be billed at $185-750/day or as specified in a separate agreement. Professional services provided by others billed through MBK will be billed at cost plus a service charge of 5% or as specified in a separate agreement.

5. Billings will be made monthly and payment will be due within 45 days. Accounts not paid within 90 days of presentation will bear interest at the rate of 1½% per month or fraction thereof from the billing date unless other arrangements are made in advance.

6. If accounts are not paid within 90 days of presentation, the firm may retain an attorney to obtain payment. In the event that it does so and payment of all or part of the account is thereafter obtained, reasonable attorney’s fees and other costs incurred to obtain such payment shall also be paid, or if payment is obtained by Judgment, shall be awarded as part of the Judgment. ~ Rates subject to adjustment on January 1st of each year ~ Attachment 1 Attachment 2:

HDR Scope and Fee
Scope and Fee Estimate for
Engineering Services
Urban Levee Design Criteria Certification and
Federal Emergency Management Agency
Determination
Marysville Ring Levee
August 14, 2025
Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | i

CONTENTS
Introduction.................................................................................................................................................... 1 Scope of Work............................................................................................................................................... 1 Task 1 Project Management ............................................................................................................... 2

1.1 Project Management .................................................................................................... 2

1.2 Invoicing ....................................................................................................................... 2

1.3 Project Management Meetings .................................................................................... 3 Task 2 Background Review and Analysis........................................................................................... 3

2.1 Review of Existing Information..................................................................................... 3

2.2 Site Reconnaissance.................................................................................................... 4

2.3 Review of Water Surface Information .......................................................................... 4

2.4 Design Criteria Review................................................................................................. 5

2.4.1 Information Gap Closure .............................................................................................. 7

2.4.2 Coordination with MHM Engineering for Penetrations ................................................. 7 3 Engineer’s Opinion .................................................................................................................... 7 4 Fee Estimate ....................................................................................................................................... 8 5 Schedule............................................................................................................................................ 11 Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 1

INTRODUCTION
The City of Marysville (City) is located 40 miles north of Sacramento, California, at the confluence of the Yuba and Feather Rivers. Being located between these two rivers has meant that flooding has long been a major concern, with the Yuba Basin experiencing seven major flood events since 1940.

Large flood events occurred in 1986 and 1997 that caused an estimated $95 million and $83 million in damage, respectively. To meet flood protection standards set by California’s Urban Levee Criteria Program (ULDC) and Federal Emergency Management Agency (FEMA) flood insurance standards, the U.S. Army Corps of Engineers (USACE) designed and constructed improvements to the 7.6 mile Marysville Ring Levee System beginning with Phase1 (Reaches 1 and 3) in 2014 and completed in 2024 with Reach 3, Highway 70 gap (https://www.spk.usace.army.mil/Missions/CivilWorks/Marysville-Ring-Levee/), and Reach 3, Phase 2B, currently reaching completion. Also, Caltrans has constructed a levee (referenced as the Finger Levee) along Highway 70. A list of the individual construction phases is as follows:
• Highway 70 Caltrans – New Levee with a Cut-off-Wall
• Phase 1 – Open Trench Soil Bentonite Cut-off-Wall
• Phase 2A North – Open Trench Soil Bentonite Cut-off-Wall • Phase 2A South – Deep Soil Mixing Soil Bentonite Cut-off-Wall • Phase 2B – Open Trench Soil Bentonite Cut-off-Wall
• Phase 2C – Deep Soil Mixing Soil Bentonite Cut-off-Wall • Phase 3 – Deep Soil Mixing and Open Trench Soil Bentonite Cut-off-Wall • Phase 4A – Seepage Berm
The City seeks to obtain levee certification approval from the State of California, and from FEMA, that the Ring Levee System meets the ULDC and FEMA, 100- and 200-year flood event criteria. As a subconsultant on the MBK Engineers team, HDR has been asked to provide a review of the geotechnical engineering design and construction to support certification efforts. Below is HDR’s scope of work to review the geotechnical engineering design and construction records as compared to the design water surface elevations for the 100- and 200-year flood events.

SCOPE OF WORK
HDR’s scope of work in support of Marysville Ring Levee Certification will include the review of the USACE engineering design and construction documentation from a geotechnical engineering standpoint to determine that the records support FEMA definition of certification criteria. HDR is familiar with the Ring Levee System and has been previously involved in portions of USACE’s Phase 2 geotechnical engineering efforts and have provided a review of the overall geotechnical engineering documentation to assess potential gaps in information and assessments in the USACE past efforts. For this scope of work, HDR will be reviewing geotechnical engineering that has been performed by USACE, or its consultants, with the specific goal of providing an Engineer’s Opinion of certifications that the Ring System meets ULDC and FEMA flood criteria. Should HDR find during its review efforts that gaps in information, or that the construction efforts are different than was Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 2
assumed during engineering design efforts, HDR will work with the City and the MBK team members to assess the impacts and next steps.

The work outlined in this scope has been divided into tasks in accordance with the following work breakdown structure:
• Project Management
• Background Review and Analysis
o Review of Existing Information
o Site Reconnaissance
o Review of Water Surface Information
o Design Criteria Review
o Information Gap Closure
• Engineer’s Opinion
• Meetings and Marysville Team Coordination
The scope of design support and associated fee is currently unknown at this time and will be provided as a supplemental scope of services, developed by HDR and authorized by MBK and the City prior to implementation.

Task 1 Project Management

1.1 Project Management
HDR's project manager (PM) will manage the scope, schedule, and budget for the project activities outlined for this amendment. Project management will also occur at the activity level for each team member as shown on the attached breakdown of hours. In addition, the PM will coordinate with MBK, agencies, and the City as requested throughout the duration of this task. The assumed duration of the project is 12 months, assuming no design support services are required.

1.2 Invoicing
HDR will prepare monthly progress reports that document project activities and update the project schedule and budget status. Items that the progress report will include are:
• Financial status summary.
• Project schedule and deliverables.
• Current activities list.
• Issues list (design, schedule, and QA/QC issues).
• QA/QC review status.
• Decision log (as applicable).

Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 3
Deliverables:
• Monthly invoices
• Schedule updates (as needed).

1.3 Project Management Meetings
HDR plans to meet with MBK and the accreditation team to coordinate efforts. Except for the specific task of reviewing and assessing levee penetrations presented in Task 2.3, this task includes the following meetings:

HDR will coordinate with the City, MBK, and other the City team members as directed by the City to discuss project findings and program needs, and to help facilitate project approvals. The following types of meetings are assumed:
• Kickoff meeting – One 2-hour virtual meeting to be attended by HDR’s PM and one technical staff.
• Two close-out meetings with the project team, requiring 2 hours each of the PM. These calls will be to coordinate the Engineers Opinion Reports between the other team members and the City.

Assumptions:
• All meetings will be virtual.

Deliverables:
• Meeting notes (as applicable).

Task 2 Background Review and Analysis

2.1 Review of Existing Information
The Ring Levee Project has been conducted in phases and has involved the USACE, Caltrans and engineering consultants. With the exception of the Caltrans Finger Levee and the Highway 70 Gap, the USACE performed the geotechnical engineering in support of the mitigation designs and construction efforts. The Caltrans Finger Levee was designed by the team of Wood Rodgers (Civil Design) and Kleinfelder (Geotechnical). Similarly, Blackburn Consulting, Inc. (BCI), as a teaming partner with MGE Engineering, performed geotechnical engineering for the gap within the levee system identified along Phase 2C.

As part of this scope of work, HDR will assess the completeness of the previously prepared analyses, designs, inspection reports, and as-built records for the City’s ring levee system. The intent of this review is to evaluate what information is available to support the FEMA and ULDC determination. The anticipated documentation is to include the following:
• Previously prepared geotechnical reports and as-built documents. • Locations and extents of previous levee repairs, including: extents of cut-off-walls, berms, and relief wells (As-Built Records).

Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 4
• Past levee inspection and performance records.
• Periodic inspection reports.
• Updated information provided by MBK including the final 100- and 200-year water surface, analysis and design documents, models, plans, specifications, geospatial files, and other material relevant to any levee system modifications designed by Wood Rodgers and/or MBK.

Assumptions:
• HDR will coordinate with MBK and the City to obtain project as-built drawings/records and relevant geotechnical and geological documents, including design and analysis documents for HDRs review.
• Documents will be provided within 2 weeks of notice to proceed.

Deliverables:
• A summary of missing information, if warranted.

2.2 Site Reconnaissance
After completing and initial review of available documents, HDR will perform a series of site visits to observe the current post-construction conditions of the Ring Levee System. This will include an evaluation of the completeness of the documentation reviewed and observations of conditions that may differ from the documentation provided.

Assumptions:
• Given that the levee system has a perimeter length of 7.6 miles and multiple crossings, HDR assumes that a single site visit will be completed. Site visit will be timed and scheduled depending on the review of the existing documents.
• HDR will coordinate with MBK and the City to obtain required access to the levee system.

The City will provide all necessary keys and authorization for site access.

Deliverables:
• A summary of key observations in a brief memorandum format.

2.3 Review of Water Surface Information
MBK will provide water surface elevations associated with these flood events along the Marysville Ring levee alignment. HDR will review the various water surface elevations for 100- and 200-year flood events and compare these values to those used in the geotechnical analyses. These water surface elevations will specifically be used in HDR’s review of the geotechnical seepage and slope stability analyses performed by the USACE team.

Assumptions:
• MBK will provide the 100- and 200-year flood elevations in an excel formatted table that will be associated with the levees project stationing used by the USACE.

Deliverables:
• None
Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 5

2.4 Design Criteria Review
Utilizing the results from the first three tasks, HDR will rely on its review of the water surface elevations and as-built drawings, along with site visits to the City’s Ring Levee, to confirm the current reported conditions. These reviews will form the basis of HDR’s review and consideration of the geotechnical engineering performed to support the USACE construction efforts. HDR’s approach will be that if the as-built conditions are reflective of the geotechnical engineering recommendations, and those recommendations are consistent with the ULDC and FEMA design criteria, then the levee system meets the intended level of protection for 100- and 200-year flood events. More specifically, HDR will review the following geotechnical topics:

ULDC Section 7 (May 2012)
• Soil Sampling, Testing, and Logging (ULDC Section 7.3) • Slope Stability (ULDC Section 7.4)
• Underseepage (ULDC Section 7.5)
• Seismic Vulnerability (ULDC Section 7.7)
• Levee Geometry (ULDC Section 7.8)
• Interfaces and Transitions (ULDC Section 7.9)
• Erosion (ULDC Section 7.10)
• Penetrations (ULDC Section 7.13) review will be led by MHM Engineering (HDR to coordinate)
Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 6
FEMA in general accordance with 44 CFR 65.10
• Embankment Protection
• Embankment and Foundation Stability Awareness, and
• Settlement Analyses
HDR was not the Engineer of Record during design or construction and for certification will not become the Engineer of Record. For certification compliance HDR will review the documents produced by the USACE and Caltrans engineering teams to make an assessment. More specifically, HDR will review what was designed for comparison to what was constructed.

USACE documents include the following:
• Geotechnical Basis of Design Reports (GBODR) for each project phase, • Field reports,
• Summary of laboratory testing performed during construction, • Field testing results, and
• Final geotechnical construction reports (USACE ER 1110-1-1901) for each phase.

In keeping with the project phasing, HDR will provide a summary technical memorandum (TM) presenting a review of the listed documents for each phase. The summary will include a level of understanding of the completeness of the data, identified information gaps, and provide recommendations to mitigate, if necessary, the identified gaps. This may include additional analyses at selected cross sections.

Assumptions:
• HDR assumes that the design engineers performed a Seismic Vulnerability Study in accordance with ULDC Section 7.7. HDR’s task is to review those efforts and confirm that the studies were performed for a system-wide assessment in accordance with the ULDC section.
• Caltrans final as-built reports will be provided to HDR by November 2025. HDR understands that these documents are in production as of the date of this scope and fee development. • MBK will provide the final as-built documents, including topographical maps, plans, specifications, and geotechnical reports.
• While there is review effort overlap between the supporting data for ULDC and FEMA accreditation, HDR assumes that the accreditation submittals will be on two different schedules. Therefore, HDR has assumed a level of effort associated with each accreditation as reflected in the fee estimate below.
• HDR assumes that the local and national levee safety program(s) have accepted the construction efforts for this project in full. This indicates that the USACE has confidence that the geotechnical efforts have met the minimum ULDC and FEMA requirements for levee safety at 100- and 200-year flood events.

Deliverables:
• Summary TM of findings and noted information gaps.

Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 7

2.4.1 Information Gap Closure
HDR previously performed a data gap study for the City between 2019 and 2025. That effort was focused on the project GBODRs. During that effort two areas were identified as having gaps and were addressed. This scope of work will continue that effort by confirming that the recommendations presented in the GBODR were implemented through construction completion, as described in Section 2.4. In the event that HDR’s review determines that information gaps or construction defects may have occurred, HDR will recommend to the City and the team that additional steps be performed to assess the conformance with ULDC and FEMA criteria. Steps by the team will likely include additional seepage and slope stability calculations and modeling.

The results and conclusions of these efforts will be presented in a TM to the City. As this effort will be defined by the results of the initial tasks, this task will be scoped in an addendum for the City and MBK to consider.

Assumptions:
• The issues will be regulated to minor construction defects such as lack of or low field density test results, slightly over steepened slope grades, etc. • No further field testing or operations will be required, or if required it will be addressed by amendment to the scope of work and fee.

Deliverables:
• None

2.4.2 Coordination with MHM Engineering for Penetrations HDR will coordinate with MHM Engineering and MBK, and other team members as needed, to discuss levee penetrations and the impacts to the levee structures per ULDC Section 7.13. HDR will review the penetrations identified by MHM Engineering as to the geotechnical impacts, including seepage and stability associated with those penetrations. The following coordination meetings are assumed:
• Kickoff meeting – One 1-hour virtual meeting to be attended by HDR’s PM to develop the Task understanding.
• Task meetings – Up to two 1-hour meetings per month for three months to be attended by HDR’s PM and one technical staff to discuss project status updates.

Assumptions:
• All meetings will be virtual.

Deliverables:
• Meeting notes (as applicable).
3 Engineer’s Opinion
HDR will develop an Engineer’s Opinion Report for the Marysville Ring Levee system. The report will summarize the design level geotechnical engineering performed by the lead agency, the construction efforts as documented in the as-built drawings from a geotechnical standpoint and will Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 8
incorporate additional work completed on the levee system and the results of the background information review and analyses described above. The report will include the Engineer’s Opinions for each levee segment and address the specific elements of the ULDC and FEMA criteria relevant to HDR’s responsibility, as determined in coordination with MBK and the City. A Draft Report will be prepared for review and concurrence by the City. A Final Report will be prepared that addresses review comments.

Assumptions:
• MBK will provide the Engineer’s Opinion template for HDR review and comment; one for ULDC, and one for FEMA.
• HDR will provide an opinion for both the ULDC and FEMA topics as listed in Section 2.

Deliverables:
• Draft Engineer’s Opinion Reports – (1) ULDC report (pdf file) and (1) FEMA report (pdf). • Final Engineer’s Opinion Report – (1) ULDC report (pdf file) and (1) FEMA report (pdf). 4 FEE ESTIMATE
Attached please find HDR’s detailed fee estimate for the scope of work described herein. The efforts outlined herein are proposed to be on a time-and-materials/not-to-exceed $232,054. This estimate is based on HDR’s 2024 fees with an escalation of 5% applied to 2025 fees. Tables 1 and 2 below present HDRs proposed fee breakdown for ULDC and FEMA portions of the scope presented herein.

Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 9
Table 1: ULDC Fee Estimate
Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 10
Table 2: FEMA Fee Estimate
Scope and Fee Estimate for Engineering Services
Marysville Ring Levee
August 14, 2025 | 11
5 SCHEDULE
The following general schedule milestones have been assumed when preparing this scope of work and fee estimate:
• NTP – Beginning September 2025
• Review of Existing Information – Summary delivered Middle to End of October 2025 • Field Reconnaissance – Performed by the End of October to Early November 2025 • Design Criteria Review – Summary delivered beginning to Middle of January 2026 • Information Gap Closure – Summary delivered at the end of February 2026 • Draft Engineer’s Opinion Report – Delivered by the end of March 2026 • Final Engineer’s Opinion Report – Delivered by the end of May 2026 Attachment 3:

MHM Scope and Fee
1 | P a g e
August 11, 2025
Rebecca Money, PE, GE MBK Engineering
455 University Avenue, Suite 100
Sacramento, CA 95825-6579
Subject: Proposal to Provide Consulting Engineering Services Marysville Ring Levee FEMA and ULDC Certification
Marysville, CA
Dear Ms. Money:

MHM Incorporated (MHM) is pleased to submit this proposal for engineering and construction support services for the Marysville Ring Levee FEMA and ULDC Certification. We are a local engineering and surveying firm established in 1892 and incorporated in California in 1975. With over 130 years of service throughout northern California, we have a verifiable record of successful project experience and client retention. Being that MHM has been in Marysville for over eighty-five (85) years and District Engineer for Marysville Levee District for over sixty (60) years, we have great familiarity with the region and have built strong relationships with multiple clients and partners in the area. As a result, MHM fully understands the policies and procedures required by FEMA and ULDC, and will ensure that all project tasks, milestones, and deliverables fully comply with any requirements set forth by these agencies.

As of January 2025, MHM joined the Verdantas Team, enabling us to offer our clients additional support in various disciplines while maintaining the focus and efficiency of a small, specialized company. As Project Manager and a registered Civil Engineer and Land Surveyor, I will ensure that the team has access to the necessary resources and that high-quality work products are delivered on schedule and within budget. MHM will address FEMA-Internal Drainage, FEMAClosures, FEMA-Operations Plans, FEMA-Maintenance Plans, ULDC - 7.11 Right of Way, ULDC - 7.12 Encroachments, ULDC – 7.13 Penetrations, ULDC – 7.14 Floodwalls, ULDC –

7.15 – Animal Burrows, ULDC – 7.16 Levee Vegetation, ULDC – 7.18 Security, ULDC – 7.20 Emergency Actions and Flood Safety Plans.

Our team consists of a highly qualified group of professionals, including Professional Civil Engineers and Professional Land Surveyors as well as a support staff of experienced technicians.

The key team members are Sean Minard, John Mallen, Roger Hanlin, and Kyle Sanchez. Our clients include numerous public agencies such as cities, counties, and special districts, as well as private entities. MHM has worked on SBFCA and TRLIA FEMA and ULDC certifications and understand the requirements. Sean Minard is currently the District Engineer for Marysville Levee District. Our clients include numerous public agencies such as cities, counties, and special districts, as well as private entities. MHM prepared worked on other Urban Level of Flood Protection (ULOP) Adequate Progress Findings Reports and is fully aware of the ULOP requirements. The scope of work shall be in accordance with the requirements, definitions, and descriptions in the State of California Department of Water Resources’ (DWR) Urban Level of Flood Protection (ULOP) Criteria (November 2013), Section 2, EVD-3 and the Urban Levee 2 | P a g e
Design Criteria (ULDC) (May, 2012), Section 7.0.

MHM will address FEMA-Internal Drainage, FEMA- Closures, FEMA-Operations Plans, FEMA-Maintenance Plans, ULDC - 7.11 Right of Way, ULDC - 7.12 Encroachments, ULDC –

7.13 Penetrations, ULDC – 7.14 Floodwalls, ULDC – 7.15 – Animal Burrows, ULDC – 7.16 Levee Vegetation, ULDC – 7.18 Security, ULDC – 7.20 Emergency Actions and Flood Safety Plans. Below is a summary of the extra scope of scope:
• Project Management and Coordination
MHM will provide project management throughout the 12-month project. The work will include invoicing and invoice reports, and progress meetings. MHM has estimate 58 man-hours to complete this task with an estimated cost of $16,497.

Deliverables –
 Project Management (September 1, 2025 through September 30, 2026)  Monthly Invoicing and Billing Summary Reports – Assume 12 invoices  Progress Meeting – Assume 8 virtual meetings at 1.0 hours each (two MHM Staff Members will attend)
• FEMA Internal Drainage
MHM will research historic information, drainage reports, As-Built Drawings, and operation and maintenance record to determine the residual 100 year flood plain. The scope of work will include aerial photography, topographic surveys of key items, hydrologic modeling, hydraulic modeling, and internal flood plan map. The analysis will identify the source(s) of flooding, the extent of the flooded area, and, if the average depth is greater than one foot, the water-surface elevation(s) of the base flood. The analysis will be based on the joint probability of interior and exterior flooding and the capacity of facilities (such as drainage lines and pumps) for evacuating interior floodwaters. The work will also include the engineers’ opinion and certification of the internal drainage in accordance with FEMA 44 CFR 65.10 standards. The scope of work will not include preliminary title reports or boundary surveys. MHM has estimate 660 man-hours to complete this task with an estimated cost of $152,009.

Deliverables –
 Internal Drainage Analysis Report
 Internal Flood Plan Map
 Engineers’ Opinion/Certification
• FEMA Closures
MHM will research historic information, DWR levee inspections reports, USACE periodic inspections, DWR Levee Logs, As-Built Drawings, USACE O&M Manual, 3 | P a g e
and MHM Levee Logs, and operation and maintenance record to determine the locations of the closure structures within the Marysville Ring Levee. The scope of work will include verification that all openings have closure devices that are structural parts of the system during operation and designed in accordance with sound engineering practice. The closure devices include gate valves, butterfly valves, flood control structures on railroads (aka stop log structures), and sluice gates. The work will also include the engineers’ opinion and certification the closures are in accordance with FEMA 44 CFR 65.10 standards. We did assume that the work on ULDC Section 7.13 and 7.14 have been completed so there is not a duplicate of scope for work and fees. MHM has estimate 8 man-hours to complete this task with an estimated cost of $2,281.

Deliverables –
 Engineers’ Opinion/Certification for Closures
• FEMA Operation Plan
MHM will research historical information, document review, USACE O&M Manuals, and other maintenance plans. Levee systems should have an operational plan. The plan shall cover all closure devices or mechanical systems for internal drainage, whether manual or automatic, and must be operated in accordance with an officially adopted operation manual. A copy shall be provided to FEMA by the operator when levee or drainage system recognition is being sought or when the manual for a previously recognized system is revised in any manner. All operations must be under the jurisdiction of a Federal or State agency, an agency created by Federal or State law, or an agency of a community participating in the NFIP. The work will also include the engineers’ opinion and certification that the Operational Plan is in accordance with FEMA 44 CFR 65.10 standards. The scope of work will not include preparing operational plan but will be gathering existing operational plans for this certification. MHM has estimate 30 man-hours to complete this task with an estimated cost of $7,917.

Deliverables –
 Operational Plan Technical Memorandum
 Engineers’ Opinion/Certification for Operation Plan Compliance. • FEMA Maintenance Plan
MHM will research historical information, document review, USACE O&M Manuals, and other maintenance plans. Levee systems must be maintained in accordance with an officially adopted maintenance plan, and a copy of this plan must be provided to FEMA by the owner of the levee system when recognition is being sought or when the plan for a previously recognized system is revised in any manner.

All maintenance activities must be under the jurisdiction of a Federal or State agency, an agency created by Federal or State law, or an agency of a community participating 4 | P a g e
in the NFIP that must assume ultimate responsibility for maintenance. This plan must document the formal procedure that ensures that the stability, height, and overall integrity of the levee and its associated structures and systems are maintained. At a minimum, maintenance plans shall specify the maintenance activities to be performed, the frequency of their performance, and the person by name or title responsible for their performance. The work will also include the engineers’ opinion and certification that the Maintenance Plans are in accordance with FEMA 44 CFR

65.10 standards. The scope of work will not include preparing maintenance plan but will be gathering existing maintenance plans. MHM has estimate 32 man-hours to complete this task with an estimated cost of $8,465.

Deliverables –
 Maintenance Plan Technical Memorandum
 Engineers’ Opinion/Certification for Maintenance Plan Compliance. • 7.11 – Right-of-Way
MHM will research historic information, document review, and parcel quest to determine the status of the right-of-way for the Marysville Ring Levee. The scope of work will include preparing an exhibit showing the right-of-way. The work will also include the full EVD-1 finding. The scope of work will not include preliminary title reports or boundary surveys. MHM has estimate 190 man-hours to complete this task with an estimated cost of $49,778.

Deliverables –
 Technical Memorandum Right-of-Way Plan
 EVD-1 Finding for Right-of-Way.
• 7.12 – Encroachments
MHM will research historic information, DWR Levee Logs, As-Built Drawings, USACE O&M Manual, MHM Levee Logs, and parcel quest to determine the amount of encroachments on the Marysville Ring Levee. The scope of work will include preparing an excel spreadsheet similar to what was prepared by MHM for Sutter Butte Flood Control Agency and a site assessment. The work will also include making the EVD-1 finding. The scope of work will not topographic surveys. MHM has estimated 90 man-hours to complete this task with an estimate cost of $24,024.

Deliverables –
 Civil Due Diligence Report
 Spreadsheet of Record Marysville Ring Levee Encroachments.  Obtain existing encroachment permits
 Scope of work for additional work.
 EVD-1 Finding for Encroachments.
5 | P a g e
• 7.13 – Penetrations
MHM will research historic information, DWR Levee Logs, As-Built Drawings, USACE O&M Manual, MHM Levee Logs, and parcel quest to determine the amount of encroachments on the Marysville Ring Levee. The scope of work will include preparing an excel spreadsheet similar to what was prepared by MHM for Sutter Butte Flood Control Agency and a site assessment. The work will also include development of scope of work for additional work to make the progress EVD-3 finding and the full EVD-1 finding. The scope of work will not topographic surveys, pressure testing, or video testing of pipelines. MHM has estimated 66 man-hours to complete this task with an estimate cost of $17,754.

Deliverables –
 Civil Due Diligence Report
 Spreadsheet of Record Marysville Ring Levee Penetrations  Obtain existing encroachment permits
 EVD-1 Findings for Penetrations.
• 7.14 – Floodwalls, Retaining Walls, Closure Structures MHM will research historic information, DWR Levee Logs, As-Built Drawings, USACE O&M Manual, and MHM Levee Logs to determine the amount of encroachments on the Marysville Ring Levee. The scope of work will include preparing an excel spreadsheet similar to what was prepared by MHM for Sutter Butte Flood Control Agency and a site assessment. The work will also include development of scope of work for additional work to make the progress EVD-3 finding and the full EVD-1 finding. The scope of work will not topographic surveys.

MHM has estimated 44 man-hours to complete this task with an estimate cost of $11,527.

Deliverables –
 Civil Due Diligence Report
 Spreadsheet of Record Marysville Ring Levee Floodwalls, Retaining Walls, and Closure Structures
 Obtain existing encroachment permits
 EVD-1 Findings for Floodwalls, Retaining Walls, and Closure Structures. • 7.15 – Animal Borrows
MHM will research historic levee inspections reports, USACE periodic inspections, DWR Levee Logs, and MHM Levee Logs to assess the animal borrow issues. The scope of work will include EVD-1 finding. MHM has estimated 20 man-hours to complete this task with an estimate cost of $4,000.
6 | P a g e
Deliverables –
 Civil Due Diligence Report
 EVD-1 Findings for Animal Borrows
• 7.16 – Vegetation
MHM will research historic information, DWR levee inspections reports, USACE periodic inspections, DWR Levee Logs, As-Built Drawings, USACE O&M Manual, and MHM Levee Logs to determine the extent of the vegetation issue on the Marysville Ring Levee. The scope of work will include EVD-1 finding. The scope of work will not topographic surveys. MHM has estimated 26 man-hours to complete this task with an estimate cost of $6,902.

Deliverables –
 Civil Due Diligence Report
 EVD-1 Findings for Vegetation Compliance
• 7.18 – Security
MHM will research historic information, DWR levee inspections reports, USACE periodic inspections, DWR Levee Logs, As-Built Drawings, USACE O&M Manual, and MHM Levee Logs to determine the security features in-place on the Marysville Levee. Security features includes gates, fences, blocks, signage, and other facilities to restrict access or control access. The scope of work will include EVD-1 finding.

The scope of work will not topographic surveys. MHM has estimated 28 man-hours to complete this task with an estimate cost of $7,598.

Deliverables –
 Civil Due Diligence Report
 Spreadsheet of Record Marysville Ring Levee Security Features  Obtain existing encroachment permits
 EVD-1 Findings for Security.
• 7.20 – Emergency Actions
MHM will research historic information, DWR levee inspections reports, USACE periodic inspections, DWR Levee Logs, As-Built Drawings, USACE O&M Manual, and MHM Levee Logs to determine the any emergency action procedures currently in use or published for the Marysville Levee. The scope of work will include EVD-1 finding. MHM has estimated 26 man-hours to complete this task with an estimate cost of $7,049.

Deliverables –
7 | P a g e
 Civil Due Diligence Report
 Obtain existing USACE O&M Manuals, Emergency Action Plans, Low Rise Plans, and other emergency action plans.
 EVD-1 Findings for Emergency Actions.

We would like the opportunity to meet with you to discuss our extra work scope of work to ensure that it is complete and that it meets your needs. We look forward to continue providing the services outlined. The total not-to-exceed budget is $316,658. I can be reached at (530) 742- 6485 with any questions.

Sincerely,

MHM INCORPORATED
Sean Minard, P.E., P.L.S.

Principal Civil Engineer
Task Order No. 1 - Attachment No. 1
MHM Incorporated - Engineering Services
City of Marysville

MARYSVILLE RING LEVEE CERTIFICATION PROJECT

COMBINED FEE SUMMARY
No. Task Description MHM
Total Costs
MBK
Verdantas

ENGINEERING SERVICES - MARYSVILLE RING LEVEE CERTIFICATION A1 Project Management and Coordination
A1.1 Project Management (August 1, 2025 through August 31, 2025) 7,353$ - $ $ - 7,353$ A1.2 Invoicing and Progress Reports 4,499$ - $ $ - 4,499$ A1.3 Progress Meetings 4,645$ - $ $ - 4,645$
Subtotal Project Management and Coordination 16,497$ - $ $ - 16,497$ TOTAL - PROJECT MANAGEMENT 16,497$ - $ $ - 16,497$

FEMA CERTIFICATION
B1 FEMA - Internal Drainage
B1.1 Data Collection, Field Visits, and Review 2,997$ - $ $ - 2,997$ B1.2 Survey Control (Horizontal and Vertical) 3,408$ - $ $ - 3,408$ B1.3 Surveys (Topographic, Planimetric, and Aerial) 22,368$ - $ $ - 22,368$ B1.4 Digital Terrain Model 11,416$ - $ $ - 11,416$
B1.5 Aerial Photography 3,295$ - $ $ - 3,295$
B1.6 Hydrologic Modeling (HEC-HMS using latest NOAA rainfall data) 21,839$ - $ $ - 21,839$ B1.7 Hydraulic Modeling (HEC-RAS) 61,868$ - $ $ - 61,868$ B1.8 Internal Flood Plan Map (updated mapping and hydraulic information) 22,706$ - $ $ - 22,706$ B1.9 Engineer's Opinion/Certification 2,111$ - $ $ - 2,111$ Subtotal FEMA - Internal Drainage 152,009$ - $ $ - 152,009$ B2 FEMA - Closures (assume completed after ULDC Section 7.14) B2.1 Data Collection, Field Visits, and Review 613$ - $ $ - 613$ B2.2 Prepare Closures TM for FEMA Certification Report 1,056$ - $ $ - 1,056$ B2.3 Engineer's Opinion/Certification 613$ - $ $ - 613$ Subtotal FEMA - Closures (assume completed after ULDC Section 7.14) 2,281$ - $ $ - 2,281$ B3 FEMA - Operations Plans and Criteria (assume complete after ULDC 7.20) B3.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ B3.2 Prepare Operations Plans and Criteria TM for FEMA Certification Report 5,594$ - $ $ - 5,594$ B3.3 Engineer's Opinion/Certification 1,161$ - $ $ - 1,161$ Subtotal FEMA - Operations Plans and Criteria (assume complete after ULDC 7.20) 7,917$ $ - $ - 7,917$ B4 FEMA - Maintenance Plans (assume complete after ULDC 7.20) B4.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ B4.2 Prepare Maintenance Plans TM for FEMA Certification Report 6,143$ - $ $ - 6,143$ B4.3 Engineer's Opinion/Certification 1,161$ - $ $ - 1,161$ Subtotal FEMA - Maintenance Plans (assume complete after ULDC 7.20) 8,465$ - $ $ - 8,465$ TOTAL - FEMA CERTIFICATION 170,673$ - $ $ - 170,673$
Summary of Costs
MLD - Marysville Ring Levee Certification 1 of 3
Task Order No. 1 - Attachment No. 1
MHM Incorporated - Engineering Services
City of Marysville

MARYSVILLE RING LEVEE CERTIFICATION PROJECT

COMBINED FEE SUMMARY
No. Task Description MHM
Total Costs
MBK
Verdantas

ENGINEERING SERVICES - MARYSVILLE RING LEVEE CERTIFICATION

ULDC CERTIFICATION
C1 ULDC - 7.11 - Right of Way
C1.1 Data Collection, Field Visits, and Review 1,225$ - $ $ - 1,225$ C1.2 Prepare Right-of-Way TM for ULDC Report 36,205$ - $ $ - 36,205$ C1.3 Summary of Right of Way Table 11,186$ - $ $ - 11,186$ C1.4 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.11 - Right of Way 49,778$ - $ $ - 49,778$ C2 ULDC - 7.12 - Encroachments
C2.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ C2.2 Prepare Encroachment TM for ULDC Report 7,114$ - $ $ - 7,114$ C2.3 Prepare Encroachment Mitigation Plan for ULDC Report 7,114$ - $ $ - 7,114$ C2.4 Summary of Encroachments Table 7,475$ - $ $ - 7,475$ C2.5 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.12 - Encroachments 24,024$ - $ $ - 24,024$ C3 ULDC - 7.13 - Penetrations
C3.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ C3.2 Prepare Penetrations TM for ULDC Report 5,404$ - $ $ - 5,404$ C3.3 Prepare Penetrations Mitigation Plan for ULDC Report 5,404$ - $ $ - 5,404$ C3.4 Summary of Penetrations Table 4,624$ - $ $ - 4,624$ C3.5 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.13 - Penetrations 17,754$ - $ $ - 17,754$ C4 ULDC - 7.14 - Floodwalls, Retaining Walls, and Closure Structures C4.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ C4.2 Prepare Floodwalls, Retaining Walls, and Closure Structures TM for ULDC Report 4,791$ - $ $ - 4,791$ C4.3 Summary of Floodwalls, Retaining Walls, and Closure Structures Table 4,413$ - $ $ - 4,413$ C4.4 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.14 - Floodwalls, Retaining Walls, and Closure Structures 11,527$ - $ $ - 11,527$ C5 ULDC - 7.15 - Animal Burrows
C5.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ C5.2 Prepare Animal Burrow Section for ULDC Report 2,533$ - $ $ - 2,533$ C5.3 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.15 - Animal Burrows 4,855$ - $ $ - 4,855$ C6 ULDC - 7.16 - Levee Vegetation
C6.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ C6.2 Prepare Levee Vegetation TM for ULDC Report 4,580$ - $ $ - 4,580$ C6.3 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.16 - Levee Vegetation 6,902$ - $ $ - 6,902$ Summary of Costs
MLD - Marysville Ring Levee Certification 2 of 3
Task Order No. 1 - Attachment No. 1
MHM Incorporated - Engineering Services
City of Marysville

MARYSVILLE RING LEVEE CERTIFICATION PROJECT

COMBINED FEE SUMMARY
No. Task Description MHM
Total Costs
MBK
Verdantas

ENGINEERING SERVICES - MARYSVILLE RING LEVEE CERTIFICATION C7 ULDC - 7.18 - Security
C7.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ C7.2 Prepare Security TM for ULDC Report 5,275$ - $ $ - 5,275$ C7.3 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.18 - Security 7,598$ - $ $ - 7,598$
C8 ULDC - 7.20 - Emergency Actions and Flood Safety Plans C8.1 Data Collection, Field Visits, and Review 1,161$ - $ $ - 1,161$ C8.2 Prepare Emergency Actions and Flood Safety Plan TM for ULDC Report 4,727$ - $ $ - 4,727$ C8.3 ULDC Compliance Certification 1,161$ - $ $ - 1,161$ Subtotal ULDC - 7.20 - Emergency Actions and Flood Safety Plans 7,049$ - $ $ - 7,049$ TOTAL - ULDC CERTIFICATION 129,489$ - $ $ - 129,489$
Subconsultants Markup (10%) $0 $0
GRAND TOTAL EFFORT $316,658 $0 $0 $316,658
Summary of Costs
MLD - Marysville Ring Levee Certification 3 of 3
Task Order No. 1 - Attachment No. 2
MHM Incorporated - Engineering Services
City of Marysville

MARYSVILLE RING LEVEE CERTIFICATION PROJECT

MHM DETAILED FEE ESTIMATE
Labor
2 Man
P12 P11 P10 P9 P6 P5 P4 P3 Survey A4
Rates 336.50 296.00 280.50 265.00 214.00 204.00 194.00 183.50 341.50 132.50 3.50%

ENGINEERING SERVICES - MARYSVILLE RING LEVEE CERTIFICATION A1 Project Management and Coordination
A1.1 Project Management (August 1, 2025 through August 31, 2025) 24 24 7,104$ 249$ 7,353$ A1.2 Invoicing and Progress Reports 12 6 18 4,347$ 152$ 4,499$ A1.3 Progress Meetings 8 8 16 4,488$ 157$ 4,645$ Subtotal Project Management and Coordination 0 44 0 8 0 0 0 0 0 6 58 15,939$ 558$ 16,497$ TOTAL - PROJECT MANAGEMENT 0 44 0 8 0 0 0 0 0 6 58 15,939$ 558$ 16,497$ FEMA CERTIFICATION B1 FEMA - Internal DrainageB1.1 Data Collection, Field Visits, and Review 4 8 12 2,896$ 101$ 2,997$ B1.2 Survey Control (Horizontal and Vertical) 2 8 10 3,293$ 115$ 3,408$ B1.3 Surveys (Topographic, Planimetric, and Aerial) 4 60 64 21,612$ 756$ 22,368 $ B1.4 Digital Terrain Model 4 12 40 56 11,030$ 386$ 11,416$ B1.5 Aerial Photography 4 12 16 3,184$ 111$ 3,295$ B1.6 Hydrologic Modeling (HEC-HMS using latest NOAA rainfall data) 30 80 110 21,100$ 739$ 21,839$ B1.7 Hydraulic Modeling (HEC-RAS) 16 120 160 296 59,776$ 2,092$ 61,868$ B1.8 Internal Flood Plan Map (updated mapping and hydraulic information) 8 40 60 108 21,938$ 768 $ 22,706$ B1.9 Engineer's Opinion/Certification 4 4 8 2,040$ 71$ 2,111$ Subtotal FEMA - Internal Drainage 0 32 10 0 218 0 12 340 68 0 680 146,869$ 5,140$ 152,009$ B2 FEMA - Closures (assume completed after ULDC Section 7.14)B2.1 Data Collection, Field Visits, and Review 2 2 592$ 21$ 613$ B2.2 Prepare Closures TM for FEMA Certification Report 2 2 4 1,020$ 36$ 1,056$ B2.3 Engineer's Opinion/Certification 2 2 592$ 21$ 613$ Subtotal Hydrologic Modeling (HEC-HMS using latest NOAA rainfall data) 0 6 0 0 2 0 0 0 0 0 8 2,204$ 77$ 2,281$ B3 FEMA - Operations Plans and Criteria (assume complete after ULDC 7.20)B3.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ B3.2 Prepare Operations Plans and Criteria TM for FEMA Certification Report 4 12 4 2 22 5,405$ 189$ 5,594$ B3.3 Engineer's Opinion/Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal FEMA - Operations Plans and Criteria (assume complete after ULDC 7.20) 0 8 0 16 0 0 4 0 0 2 30 7,649$ 268$ 7,917$ B4 FEMA - Maintenance Plans (assume complete after ULDC 7.20)B4.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ No. Task Description Expenses Total Total
Hours
Total Labor
($)
Task Order No. 1 - Attachment No. 2
MHM Incorporated - Engineering Services
City of Marysville

MARYSVILLE RING LEVEE CERTIFICATION PROJECT

MHM DETAILED FEE ESTIMATE
Labor
2 Man
P12 P11 P10 P9 P6 P5 P4 P3 Survey A4
Rates 336.50 296.00 280.50 265.00 214.00 204.00 194.00 183.50 341.50 132.50 3.50%

ENGINEERING SERVICES - MARYSVILLE RING LEVEE CERTIFICATION No. Task Description Expenses Total Total
Hours
Total Labor
($)
B4.2 Prepare Maintenance Plans TM for FEMA Certification Report 4 14 4 2 24 5,935$ 208$ 6,143$ B4.3 Engineer's Opinion/Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal FEMA - Maintenance Plans (assume complete after ULDC 7.20) 0 8 0 18 0 0 4 0 0 2 32 8,179$ 286$ 8,465$ TOTAL - FEMA CERTIFICATION 0 54 10 34 220 0 20 340 68 4 750 164,901$ 5,772$ 170,673$ ULDC CERTIFICATION C1 ULDC - 7.11 - Right of WayC1.1 Data Collection, Field Visits, and Review 4 4 1,184$ 41$ 1,225$ C1.2 Prepare Right-of-Way TM for ULDC Report 16 40 40 40 2 138 34,981$ 1,224$ 36,205 $ C1.3 Summary of Right of Way Table 4 24 16 44 10,808$ 378$ 11,186$ C1.4 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.11 - Right of Way 0 26 40 66 0 56 0 0 0 2 190 48,095$ 1,683$ 49,778$ C2 ULDC - 7.12 - EncroachmentsC2.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ C2.2 Prepare Encroachment TM for ULDC Report 8 16 2 26 6,873$ 241$ 7,114$ C2.3 Prepare Encroachment Mitigation Plan for ULDC Report 8 16 2 26 6,873$ 241$ 7,114$ C2.4 Summary of Encroachments Table 4 14 12 30 7,222$ 253$ 7,475$ C2.5 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.12 - Encroachments 0 24 0 50 0 0 12 0 0 4 90 23,212$ 812$ 24,024$ C3 ULDC - 7.13 - PenetrationsC3.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ C3.2 Prepare Penetrations TM for ULDC Report 6 12 2 20 5,221$ 183$ 5,404$ C3.3 Prepare Penetrations Mitigation Plan for ULDC Report 6 12 2 20 5,221$ 183$ 5,404$ C3.4 Summary of Penetrations Table 4 8 6 18 4,468$ 156$ 4,624$ C3.5 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.13 - Penetrations 0 20 0 36 0 0 6 0 0 4 66 17,154$ 600$ 17,754$ C4 ULDC - 7.14 - Floodwalls, Retaining Walls, and Closure StructuresC4.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ C4.2 Prepare Floodwalls, Retaining Walls, and Closure Structures TM for ULDC Report
4 12 2 18 4,629$ 162$ 4,791$
C4.3 Summary of Floodwalls, Retaining Walls, and Closure Structures Table 2 8 8 18 4,264$ 149$ 4,413$ Task Order No. 1 - Attachment No. 2
MHM Incorporated - Engineering Services
City of Marysville

MARYSVILLE RING LEVEE CERTIFICATION PROJECT

MHM DETAILED FEE ESTIMATE
Labor
2 Man
P12 P11 P10 P9 P6 P5 P4 P3 Survey A4
Rates 336.50 296.00 280.50 265.00 214.00 204.00 194.00 183.50 341.50 132.50 3.50%

ENGINEERING SERVICES - MARYSVILLE RING LEVEE CERTIFICATION No. Task Description Expenses Total Total
Hours
Total Labor
($)
C4.4 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.14 - Floodwalls, Retaining Walls, and Closure Structures 0 10 0 24 0 0 8 0 0 2 44 11,137$ 390$ 11,527$ C5 ULDC - 7.15 - Animal BurrowsC5.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ C5.2 Prepare Animal Burrow Section for ULDC Report 2 6 2 10 2,447$ 86$ 2,533 $ C5.3 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.15 - Animal Burrows 0 6 0 10 0 0 0 0 0 2 18 4,691$ 164$ 4,855$ C6 ULDC - 7.16 - Levee VegetationC6.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ C6.2 Prepare Levee Vegetation TM for ULDC Report 2 12 2 2 18 4,425$ 155$ 4,580 $ C6.3 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.16 - Levee Vegetation 0 6 0 16 0 0 2 0 0 2 26 6,669$ 233$ 6,902$ C7 ULDC - 7.18 - SecurityC7.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ C7.2 Prepare Security TM for ULDC Report 2 16 2 20 5,097$ 178$ 5,275$ C7.3 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.18 - Security 0 6 0 20 0 0 0 0 0 2 28 7,341$ 257$ 7,598$ C8 ULDC - 7.20 - Emergency Actions and Flood Safety PlansC8.1 Data Collection, Field Visits, and Review 2 2 4 1,122$ 39$ 1,161$ C8.2 Prepare Emergency Actions and Flood Safety Plan TM for ULDC Report 2 14 2 18 4,567$ 160$ 4,727$ C8.3 ULDC Compliance Certification 2 2 4 1,122$ 39$ 1,161$ Subtotal ULDC - 7.20 - Emergency Actions and Flood Safety Plans 0 6 0 18 0 0 0 0 0 2 26 6,811$ 238$ 7,049$ TOTAL - ULDC CERTIFICATION 0 104 40 240 0 56 28 0 0 20 488 125,110$ 4,379$ 129,489$ TOTAL EFFORT 0 202 50 282 220 56 48 340 68 30 1,296 305,950$ 10,708$ 316,658$ Task Order No. 1 - Attachment No. 3
MHM Incorporated - Engineering Services
City of Marysville

MARYSVILLE RING LEVEE CERTIFICATION PROJECT

LABOR RATE SCHEDULE
Fully Burdened Labor Rates 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% Labor Classification 2025 Labor Rates 2026 Labor Rates 2027 Labor Rates 2028 Labor Rates 2029 Labor Rates 2030 Labor Rates Weighted P12 - Senior Consultant III, VP, Senior Principal Senior Professional - Grade 12 330.00$ 343.00$ 357.00$ 371.00$ 386.00$ 401.00$ 336.50$ P11 - Senior Consultant II, AVP, Principal Senior Professional - Grade 11 290.00$ 302.00$ 314.00$ 327.00$ 340.00$ 354.00$ 296.00$ P10 -Senior Consultant I Senior Professional - Grade 10 275.00$ 286.00$ 297.00$ 309.00$ 321.00$ 334.00$ 280.50$ P9 -Project Manager III Senior Professional - Grade 9 260.00$ 270.00$ 281.00$ 292.00$ 304.00$ 316.00$ 265.00$ P8 - Project Manager II Senior Professional - Grade 8 240.00$ 250.00$ 260.00$ 270.00$ 281.00$ 292.00$ 245.00$ P7 - Project Manager I Senior Professional - Grade 7 220.00$ 229.00$ 238.00$ 248.00$ 258.00$ 268.00$ 224.50$ P9 - Senior Civil Engineer / Land Surveyor III Senior Professional - Grade 9 260.00$ 270.00$ 281.00$ 292.00$ 304.00$ 316.00$ 265.00$ P8 - Senior Civil Engineer / Land Surveyor II Senior Professional - Grade 8 240.00$ 250.00$ 260.00$ 270.00$ 281.00$ 292.00$ 245.00$ P7 - Senior Civil Engineer / Land Surveyor I Senior Professional - Grade 7 220.00$ 229.00$ 238.00$ 248.00$ 258.00$ 268.00$ 224.50$ P6 - Civil Engineer / Land Surveyor III Senior Professional - Grade 6 210.00$ 218.00$ 227.00$ 236.00$ 245.00$ 255.00$ 214.00$ P5 - Civil Engineer / Land Surveyor II Senior Professional - Grade 5 200.00$ 208.00$ 216.00$ 225.00$ 234.00$ 243.00$ 204.00$ P4 -Civil Engineer / Land Surveyor I Senior Professional - Grade 4 190.00$ 198.00$ 206.00$ 214.00$ 223.00$ 232.00$ 194.00$ P3 -Staff Engineer/Surveyor III Staff Professional - Grade 3 180.00$ 187.00$ 194.00$ 202.00$ 210.00$ 218.00$ 183.50$ P2 - Staff Engineer/Surveyor II Staff Professional - Grade 2 170.00$ 177.00$ 184.00$ 191.00$ 199.00$ 207.00$ 173.50$ P1 -Staff Engineer/ Surveyor I Staff Professional - Grade 1 155.00$ 161.00$ 167.00$ 174.00$ 181.00$ 188.00$ 158.00$ T6 - Resident Engineer/Lead Inspector Resident Engineer/Lead Inspector 240.00$ 250.00$ 260.00$ 270.00$ 281.00$ 292.00$ 245.00$ T5 - Building/Construction/Soils Inspector Building/Construction Inspector/Previaling Soils Tech 220.00$ 229.00$ 238.00$ 248.00$ 258.00$ 268.00$ 224.50$ T4 - Senior Technician/ Soils Technician Senior Technician/Soils Technician - Grade 4 170.00$ 177.00$ 184.00$ 191.00$ 199.00$ 207.00$ 173.50$ T3 - Technician III Technician/CADD - Grade 3 150.00$ 156.00$ 162.00$ 168.00$ 175.00$ 182.00$ 153.00$ T2 - Technician II Technician/CADD - Grade 2 125.00$ 130.00$ 135.00$ 140.00$ 146.00$ 152.00$ 127.50$ T1 -Techncian I Technician/CADD - Grade 1 115.00$ 120.00$ 125.00$ 130.00$ 135.00$ 140.00$ 117.50$ Survey Crew - 1 Man (prevailing) Survey Crew - 1 Man (prevailing) 240.00$ 250.00$ 260.00$ 270.00$ 281.00$ 292.00$ 245.00$ Survey Crew - 2 Man (prevailing) Survey Crew - 2 Man (prevailing) 335.00$ 348.00$ 362.00$ 376.00$ 391.00$ 407.00$ 341.50$ Survey Crew - 3 Man (prevailing) Survey Crew - 3 Man (prevailing) 485.00$ 504.00$ 524.00$ 545.00$ 567.00$ 590.00$ 494.50$ Survey Crew - 1 Man (non-prevailing) Survey Crew - 1 Man (non-prevailing) 225.00$ 234.00$ 243.00$ 253.00$ 263.00$ 274.00$ 229.50$ Survey Crew - 2 Man (non-prevailing) Survey Crew - 2 Man (non-prevailing) 310.00$ 322.00$ 335.00$ 348.00$ 362.00$ 376.00$ 316.00$ Survey Crew - 3 Man (non-prevailing) Survey Crew - 3 Man (non-prevailing) 385.00$ 400.00$ 416.00$ 433.00$ 450.00$ 468.00$ 392.50$ Administrative/Technical Editor IV Administrative/Technical Editor/Project Coordinator IV 130.00$ 135.00$ 140.00$ 146.00$ 152.00$ 158.00$ 132.50$ Administrative/Technical Editor III Administrative/Technical Editor/Project Coordinator III 110.00$ 114.00$ 119.00$ 124.00$ 129.00$ 134.00$ 112.00$ Administrative/Technical Editor II Administrative/Technical Editor/Project Coordinator II 100.00$ 104.00$ 108.00$ 112.00$ 116.00$ 121.00$ 102.00$ Administrative/Technical Editor I Administrative/Technical Editor/Project Coordinator I 80.00$ 83.00$ 86.00$ 89.00$ 93.00$ 97.00$ 81.50$ Other Direct Costs (ODCs)
Item rate unit
(Some EXAMPLES below; add others if needed:)Vehicle - Light Truck and Car $10.50/hr or $85/day or $1,950/month hr/day/monthVehicle - 2 Wheel Drive $11.50/hr or $95/day or $2,100/month hr/day/monthVehicle - 4 Wheel Drive $12.50/hr or $105/day or $2,250/month hr/day/monthATV - All Terrian Vehicle $9.00/hr or $75/day or $1,850/month hr/day/monthStandard Survey Equipment $17.50/hr hourGPS Survey Equipment $85.00/hr hourNuclear Gage Equipment $10.50/hr hourGPS Bathymetric Survey Equipment $60.00/hr hourDrone Survey Equipment $15.50/hr hourComputer & Peripherals $6.75/hr hourTravel Expenses/Per Diem T&M T&MVehicle Mileage IRS Rate mileReproduction (8.5x11 sizes) - Black and White $0.55/ea eachReproduction (8.5x11 sizes) - Color $0.80/ea eachReproduction (11x17 sizes) – Black and White $0.80/ea eachReproduction (11x17 sizes) - Color $1.10/ea eachLarge Format Drawing Copies – 20lb Bond – Black and White $0.75/sq ft sq ftLarge Format Drawing Copies – 20Ib Bond – Color $1.05/sq ft sq ftPlotting - Mylar $8.10/sq ft sq ftMailings and Communication T&M T&MMiscellaneous Supplies T&M T&MOutside Equipment and Services 15% Markup %Profit on Labor 10.00% %Profit on ODCs 5.00% % 50% 2025 and 50%
2026

1. Standard Billing Rates: Our standard billing rates are reviewed no less than annually and may be adjusted at those times.2. A fee of 5% of labor will be added for in-house expenses (telephone, computer, incidental copying/printing).3. Expert Testimony: Litigation, expert witness, and all other legal and court related appearances will be billed at twice the standard fee schedule rate. There is a minimum eight-hour charge per day and a minimum overall fee of $2,000.00 per case.4. Higher Hourly Rates: Certain services, such as emergency/rapid response consulting, may be subject to higher hourly billing rates as agreed upon on a project-specific basis.5. Overtime: Overtime for time worked on a project exceeding 8 hours per day, Holidays, and/or Sundays will be billed at 1.5 times the standard rate.6. Field Equipment and Supplies: Field equipment and supplies will be billed at fixed unit prices, subject to periodic updates.7. Subcontractors and Project Expenses: All project-related expenses are chargeable at cost plus 10% or in accordance with the specific project agreement. Subcontractor charges, costs of rental of specialized equipment, and any other costs not associated with normal overhead are billed at cost plus 10% or in accordance with the specific project agreement.8. Mileage: The mileage for personal vehicles will be billed at the current United States Internal Revenue Service reimbursement rate.9. General Terms and Conditions: Please refer to the General Terms and Conditions for further details.