Cities Index.
Emergency Sewer colapse Estimate

Marysville City Council
March 17, 2026

Document
Emergency Sewer colapse Estimate
Meeting
March 17, 2026
Body
Marysville City Council
Original file
898 KB
Text extracted from the city's file for reading and search. Open the original on go.boarddocs.com. That file is the official record.

Emergency Sewer colapse
Submitted By:

Blue Collar Plumbing Operations LLC
PO Box 115
Gridley CA 95948
Mobile: (530)216 3417
[email protected]
bluecollarplumbing.org
CA #1115481
CA DIR #PW-LR-2000002959
Dun & Bradstreet #124756489
218 - Emergency Sewer colapse 1
Blue Collar Plumbing Operations LLC
PO Box 115
Gridley CA 95948
Mobile: (530)216 3417
[email protected]
bluecollarplumbing.org
CA #1115481
CA DIR #PW-LR-2000002959
Dun & Bradstreet #124756489
Estimator
Jared Higby (Managing Member)
Mobile: (530) 216-3417
[email protected]
Customer
City Of Marysville
526 C St
Marysville CA 95901
Mobile: (530) 749-3901
Estimate
Job Name Emergency Sewer colapse
Job Number 218
Issue Date March 5, 2026
Valid Until April 4, 2026
Item Quantity Unit Price Amount
Line Burst Sewer main 1 Ea $201,700.00 / Ea $201,700.00

1. BCP bids a turn key start to finish install of 400 linear feet of 8” HDPE

2. Launch holes excavated in alley , Receiving hole will be middle street on 5Th.

3. New HDPE pipe will be installed into manhole not tied-in externally

4. All utilities will be potholed at crossings and laterals will be installed with Romac saddles. ( 6 known lateral tie-ins currently )

5. Backfill will be sand compacted 1-2 foot over pipe and road base overlay compacted to 95% rate in 12” lifts to ensure proper compaction.

6. 1/2” asphalt will be replaced at all excavation sites Lateral replacement 1 Ea $3,500.00 / Ea $3,500.00

1. Replace lateral and repair cavern under alley street , lateral is believed to be from the apartment complex but has not yet been confirmed. Lateral is OrangeBurg pipe and had deteriorated to almost nothing

2. Large cavern under road way is not safe for large vehicle travel at this time ** Since we are there already pricing for asphalt demo, lateral replacement and put back is heavily discounted ** Price $205,200.00
218 - Emergency Sewer colapse 2
Estimate March 5, 2026
Date 3/5/26
Jared Higby (Managing Member)
Blue Collar Plumbing Operations LLC
Date
City Of Marysville
218 - Emergency Sewer colapse 3

← All documents from this meeting