Order Date 1/29/2026
Per Quote No. 70649
CHANGE ORDER APPROVAL REQUEST
Order No. 111758
Bill To Address:
City Of Marysville
1425 F Street
Marysville, CA 95901 USA
Phone: 9258892578
Ship To Address:
City Of Marysville
1425 F Street
Marysville, CA 95901 USA
Consultant ID: NONE
End User ID: MAR040
MAR040
A. DUIE PYLE LIVINGSTON
PaymentTerms
MAR040 NET 30 DAYS
Organization ID Ship Via FOB Ship Payment Type
Freight Allowed
PO NUMBER, "SIGNED QUOTE"
Purchase Order Number Salesperson Serial Number
Michael Benjamin 13155 1/29/2026
Rep Order Date
5JBI
Order Qty Unit Price Extd Price Units Part ID/Description Revision List Price
1.00 EA $30,657.00 PN-DM15-LW $32,208.00 $30,657.00
DIMMINUTOR, Model DM-T15
DM15, 416SS Cutters, Lower Works, Less Drive
BABA: W/Subm Motor: Add $4000 cost and use (N4X-SS) Control for BABA.
As of 3/4/25
Long Description:
Model DM-T15 Dimminutor® Open Channel Comminutors including:
- Heavy-Duty Body Housing - Ductile Iron
- Cantilevered Drive design
- "Clear-Slot" Screen Clearing System
- Mechanical seal -Severe Duty, Mounted above cutters
- Stationary And Rotary Cutters - Hardened SS Individually Replaceable - Sizing Screen - Stainless steel
- Oil Bath Spindle Lubrication
- Painted 2 Coats Heavy Epoxy Coating - Osha Blue
Quote Text:
1.00 EA $18,344.00 PN-DM-DRV-3HP-SUBM-230/460 $19,272.00 $18,344.00 Drive Assembly
Long Description: Drive Assembly, 3hp Subm, Reliance, DM15-DM25, Shimpo Drive and Motor - Submersible
- Full Submersible Capability
- 3HP Submersible Explosion Proof, 230/460V. 3ph, 60 hz. Motor - 50 Feet of Cable
- Sealed Gear Reducer - Vertical - Oil Filled
Quote Text:
1.00 EA $10,873.00 PN-CF1200 $6,800.00 $10,873.00
Channel Frame-CF1200
Continued over .../
Printed: 04/06/2026 11:52 am by MBEN Order No. 111758 Change Order Office Copy Order Date 1/29/2026
Per Quote No. 70649
CHANGE ORDER APPROVAL REQUEST
Order No. 111758
Bill To Address:
City Of Marysville
1425 F Street
Marysville, CA 95901 USA
Phone: 9258892578
Ship To Address:
City Of Marysville
1425 F Street
Marysville, CA 95901 USA
Consultant ID: NONE
End User ID:
MAR040
A. DUIE PYLE LIVINGSTON
PaymentTerms
MAR040 NET 30 DAYS
Organization ID Ship Via FOB Ship Payment Type
Freight Allowed
PO NUMBER, "SIGNED QUOTE"
Purchase Order Number Salesperson Serial Number
Michael Benjamin 13155 1/29/2026
Rep Order Date
5JBI
Order Qty Unit Price Extd Price Units Part ID/Description Revision List Price Channel Frame-CF1200 To reduce Channel by 3-4" per side. (8" Total). - Accommodates channel widths up to 8" wider than grinder Long Description:
CHANNEL FRAME-Modified to meet actual installation needs during submittal - Model CF-1200
- Drop in frame style, to meet site specifications
- Bottom leveling plate
- Provides slide in cradle for easy grinder installation. - Accommodates unique channel needs see drawings provided in updated submittal
- Four Corner fabricated Angles mounted to Side Walls
- 304 Stainless Steel
See updated drawing.
Channel is 25" wide x 30" deep
Quote Text:
1.00 EA $5,539.00 PN-S25060-5-4X-SUBM $5,819.00 $5,539.00 S25060 Automatic Reversing Control, N4X, Subm.
S250/60 Controller- 2-5 HP N4X, Standard Subm. Controller, Dual Program UP TO 5HP @ 208/3/60
UP TO 5HP @ 230/3/60
UP TO 5HP @ 460/3/60
Long Description:
Automatic Reversing Controller, Model S25060
- Nema 4X FRP Enclosure
- PLC logic control, IEC starters
- LED Indicators - for long life
- Current Sensing Auto-Reversing Program
Quote Text:
1.00 01 DY $2,250.00 STARTUP $4,950.00 $2,250.00
Continued over .../
Printed: 04/06/2026 11:52 am by MBEN Order No. 111758 Change Order Office Copy Order Date 1/29/2026
Per Quote No. 70649
CHANGE ORDER APPROVAL REQUEST
Order No. 111758
Bill To Address:
City Of Marysville
1425 F Street
Marysville, CA 95901 USA
Phone: 9258892578
Ship To Address:
City Of Marysville
1425 F Street
Marysville, CA 95901 USA
Consultant ID: NONE
End User ID:
MAR040
A. DUIE PYLE LIVINGSTON
PaymentTerms
MAR040 NET 30 DAYS
Organization ID Ship Via FOB Ship Payment Type
Freight Allowed
PO NUMBER, "SIGNED QUOTE"
Purchase Order Number Salesperson Serial Number
Michael Benjamin 13155 1/29/2026
Rep Order Date
5JBI
Order Qty Unit Price Extd Price Units Part ID/Description Revision List Price Startup Services
Long Description: Startup Services - BY REP
Startup Services - By Rep
- Installation Inspection
- Warranty Certification
- O&M instructions
If more than one day, Days are Consecutive.
Normal Day Rate includes up to 8 hours.
Quote Text:
Jason Zumalt
Public Works Manager
City of Marysville
1425 F Street
Marysville, CA 95901
Cell: (530)954-0765
Sales Order Comments:
Standard Message:
We are pleased to acknowledge your order in accordance with Franklin Miller, Inc. warranty, terms and conditions attached.
Order Total: $74,571.57
Sales Tax will be added to New York, New Jersey and California invoices, unless a Tax Exempt Certificate is provided to Franklin Miller, Inc. prior to the shipment.
Subtotal $67,663.00
Freight $1,512.00
Sales Tax $5,396.57
Printed: 04/06/2026 11:52 am by MBEN Order No. 111758 Change Order Office Copy Change Order Requested by ___________________________________ Date ________________ Change Type: _______ Cancel Entire Order; ______ Change Line Items Reason for change: _________________________________________________________________________________ _________________________________________________________________________________________________ Order Sell Price After Change: ____________________
Order Sell Price Before Change: ____________________
NET CHANGE (Price After - Price Before Change): _____________________ Change Order Approved By ___________________________________ Date ________________
PLEASE LET PAMELA
LYNCH KNOW THAT WE
HAVE A CHANGE ORDER.
Thank you.
Printed: 04/06/2026 11:52 am by MBEN Order No. 111758 Change Order Office Copy