PROPOSAL TO THE PUBLIC WORKS DEPARTMENT
CITY OF MARYSVILLE
NAME OF BIDDER: _ _ _ ____ Ke_n_ N_o_rt_o_n __________ _ TITLE: ___________ _;C=E=-O=--------------
SIGNA TURE OF BIDDER: - ~---L-------+-~--<----=-= '------------ \ COMPANY NAME: _____ L_a_m_o_n_C __ o_ns_t_ru_c_ti_o_n_C_o_.-'-, _ln_c_. ____ __ _ CONTRACTOR LICENSE NO. __ 17_4_8_2_8 __ _ CLASSIFICATION A, B BUSINESS ADDRESS: _ __ 8=-7=---1=---V.:...o=n..!....,;::::G=e=ld:..:::e..:...:.rn.:....W-=-=-=a'-'-y,_, Y.:....;u=b=a"-'C=1!.!...·tyL-C=Ac....!....!:9=5=9=9_,_1 __ TELEPHONE NO.: AREA CODE ( 530) __,,6:....:... 7....:... 1-_,_1-=3..:....: 70"---------- PLACE OF RESIDENCE: Sutter County
The work to be done and referred to herein is in Marysville, State of California, and shall be constructed in accordance with the Special Provisions (including the payment of not less than the minimum wage rates set forth therein) and the contract annexed hereto and also in accordance with the Standard Plans dated 2022, the Standard Specifications dated 2022, the wage rates of the General Prevailing Wage Rates of the Department of Transportation, and the equipment rental rate and labor surcharge portions of the publication entitled "Labor Surcharges and Equipment Rental Rates."
The work to be done in accordance with the Special Provisions entitled:
CDBG PAVEMENT REHABILITATION - PHASE 3 PROJECT
Bids are submitted for the entire work. The amount of the bid, for comparison purposes, will be the total of all items. The total of unit basis items will be determined by extension of the item price on the basis of the estimated quantity set forth for the item.
The bidder shall set for each item of work, in clearly legible figures, an item price and a total for the item in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the item price bid on the basis of the estimated quantity for the item.
In case of discrepancy between the item price and the total set forth for the item, the item price shall prevail; provided, however, if the amount set forth as an item price is ambiguous, unintelligible or uncertain for any cause or is omitted, or in the case of unit basis items is the same amount as the entry in the "Total" column, then the amount set forth in the "Total" column for the item shall prevail in accordance with the following:
I. As to lump sum items, the amount set forth in the "Total" column shall be the item price.
2. As to unit basis items, the amount set forth in the "Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the item price.
If this proposal shall be accepted and the undersigned shall fail to enter into the contract and to furnish the two bonds in the sums to be determined as aforesaid with surety satisfaction to the City of Marysville, within fifteen (15) days, not including Sundays and legal holidays, after the bidder has received notice from the Director of Public Works that the contract has been awarded, the City of Marysville may, at its option, determine that the bidder has abandoned the contract, and thereupon this proposal and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this proposal shall operate and the same shall be the property of the City of Marysville.
The undersigned, as bidder, declares that he/she has received Addendum Nos. _1 _, _2_, __ , --' --' --' --
The undersigned, as bidder, declares that the only persons or parties interested in this proposal as principals are those named herein, that this proposal is made without collusion with any other person, firm, or corporation, and in submitting this proposal the undersigned bidder agrees that if it is determined that he is the successful bidder, he will execute the attached non-collusion affidavit, that he has carefully examined the location of the proposed work, the annexed proposed form of contract, and the plans therein referred to, and he proposes and agrees, if this proposal is accepted, that he will contract with the City of Marysville in the form of the copy of the contract annexed hereto, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the contract, in the manner and time therein prescribed, and according to the requirements of the Engineer as therein set forth, and that he will take in full payment therefor the following item prices, to wit:
CDBG PAVEMENT REHABILITATION - PHASE 3 PROJECT
CONTRACT 24-10
Item
No.
Item Description
Bid Schedules C Al - A8 combined
Grind 10' taper 0.15' Min. Depth at Edges & Profile as
I .. Nccessary ______ . ......... ···----~·-····· ........ , .. _ .................................... , ..... .,,. ..... ,.,.,.,.._ 2 Pavement Repair (4" HM A)
3 Geosynthetic Pavement Interlayer (Pavin~_Fabric with Oil) 4 Hot Mix Asphalt (HMA) (Type A) (2" Min. Overlay)
Hot Mix Asphalt (HM A) (Type A) (2" Min. Overlay with
5 Leveling Course)························-··---·---·-·· ·-·········-·············· ... ·· 6 Type II_ Shmy Seal ... ........... , ........................ 7 Accessible Ramp (Sinj!Je Comer - Case A) DI
8 Accessible Ramp (Sinl!Je Throul?)i - Case F) D2
9 Accessible Ramp (Double Throul?)i - Case F) D3
10 Accessible Ramo (Double Through - Case F with new Dis ) D3 1l A-._~~~~sible Ramp {Double Comer ~--~~~.~LJ?.J ................................. 12 Install Truncated Dome .M.at. in (E) Sidewalk I Ramp Area Install HMA Speed Table After Overlay with Paving M arking,s 13 and WaringSil!lls
14 Replace Commercial Driveway
15 Replace Minor Concrete (Curb and Gutter)
16 Minor Concrete - Remove & Replace Sidewalk -.. ·-··-·· ··-··-······ ......................
Rep lace minor street approach including sidewalk & curb & 17 gutter·••••····••·•·•·•······••---••··• ·•-··•··-· .......................... 18 Adjust Utility Manhole Covers to grade
19 Adiust Utility (Valve /Cleanout) Covers to irrade
20 Adjust Drain Inlet to grade
21 Rep lace Drain Inlet
Adjust Centerline Monument Covers to grade (Protect
22 p,2nument in placel ................. -....................... ,.., .... ~ ... ---·· 23 Remove Temporary Traffic_ Circle.,.-... ··--·---··-·· 24 Pavement Delineation ("STOP" Le!lend and Stop Bar)
25 Pavement Delineation ("YIELD" Lerend and line arrows) 26 Pavement Delineation Crosswalk (Detail A24F - Ladder) 27 .Pavement Delineation (Detail 22 )
28 Pavement Delineation. (Detail_ 39 /.39A) .....
Pavement Delineation (2' wide Bike lane buffer - Detail 39 / 29 D~agonal @£_0. C.) --···-·······-···---··-··-························-···· ····-··-··--··---·· ·--· 30 Pavement Delineation (Bike Lane Symbol w/ Arrow} 31 Pavement Delineation (Bike Lane Share Arrow}
32 Pavement Delineation (TYPE I, II, & II Arrows)
33 Pavement Delineation - Diazmal Parking Lines
__ 34 ,, __ ,, Bike Path. Sign .. -_ I __ Post ......... ........................... 35 Replace.Street Name Signs 2 - I Post .... , .. _,.,,.,, ..... ......... , .. _,., ...... -.-.. -..... , 36 Replace Street Name SillJl - I Post
37 Rep lace Stoo Sien - I Post
38 Replace Yield Sign - I Post
39 Replace Caltrans Siimal Loops
40 Replace Caltrans Advanced Si!l1lal Loops
Estimated
Quanti
596,600 .,,.,.,,_,_.,,,.,.
6,500
57,130
1,920
·-··· ................ 8.810
.... - ........ I 07,000
2 8
14 9
I ........ _ ...
36 ........ ·-··-··········
2 4
336
3,255
24 ····~····--···"'"""·..,..·- ..... · 30
45 21
1 13
1 ................ _, .. , ................ ,
36 3
61 9,250
. .............. } 7,1_00
15 .. 900
109
7 18
169
24 ·-······--········"•'····
17 ·-· .. ------·---···-·
12 36
3 2
2 Unit
SF -···· SF
SY
TON
TON
SF
EA
EA
EA
EA
EA
.... ----·····
EA
EA
EA
LF
SF
EA
EA
EA
EA
EA
EA
LS
EA
EA
EA
LF
LF ··········--·
EA
··········-·
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
Unit Price
($/l'nit
-··--··--··--··$0.29 ___ ····-···- $7.00
$2.66
$104.90
$112.00 -·····-···
·········-····$0.50 ..................
$10 100.00
$10 260.00
$11 ,780.00
$11,610.00
...... .. $11.,920.00, ____ ..
---~580.0Q __
$15,670.00
$15,100.00
$180.00
$30.Q.Q __ .. _
Amount
$
_ $1.73,014.00 ...........
$45,500.00
$151,965.80
$201,408.00
$986,720.00
______ $53,500.00 ...........
$20 200.00
$82 080.00
$164,920.00
$104,490.00
... $11 ,920.00 .........
_ $~0,880.00. ____
$31,340.00
$60,400.00
$60 480.00
$97 650.00
$13,260.00 ......... ·- $318,240 00 .,
$1 280.00 $38 400.00
$870.00 $39 150.00
$870.00 $18,270.00
$2,550.00 $2,550.00
--··· $870 ------··-··· .... $11)10.00
_______ j~800.00 ......... _,,l§,800.00 -----·
<;:Rnn.nn $21 Rnn nn
$600.00 $1 ,800.00
$2 700.00 $164 70000
$1.60 $14,800.00
$1.20 $20,Q20.00 ·-·-···--
......... , .. $3.25 ___ $51,675.00_.,_ .. ~·
$172.80 $18 835.20
$172.80 $1 ,209.60
$!i40.00 $9 720.00
$75.60 $12 776.40
··--··-··-·:i4~2,Q9 ........... .... ~.10~~8.00 _____
................ $.44.Q,QQ .......... - ......... $L4.aQ,.QQ ................ '!.in".nn '!.i P.60.nn
'!.i "I? nn $1.'i ,;,;7 nn
$475.00 $1 425.00
$3 780.00 $7 56000
$3 780.00 $7,560.00
Total Bid Schedules Al - A8 = $3,072,629.00
Mobilization/ Demobilization = $18,560.oo
SWPPP = $11 ,780.00
Traffic Control= $86.280.00
Total Base Bid (Schedules Al - AS)= $3,189,249.00
Item Estimated Unit Price
Item Description Unit No. Quantit ($/Unit)
Add Alternate Bid Schedule D Street (10th Street - 14th S trcet & End of I Ith 12th,& 13th Street) ' Grind I 0' taper 0.15' Min. Depth at Edges & Profile as I Necessary 107,800 SF $0.29
2 Pavement .. Repair( 4 " .. HM A) ............ -..................... - ....... - --···-·-···· l ,000 SF ····--···$7.00 ·······-······--· ,n~-•• 3 Geosynthetic_ Pavement. Interlayer (Paving Fabric. with Oil) 11,980 SY ........... $2.66 ···-----··- 4 Hot MixAsohalt (HMA) (Type A) (2" Min. Overlay with 2,020 TON $104.90 5 Accessible Ramo (Double Corner - Case C) D7 I EA $11,488.00 6 Install. Truncated _Dome M_at .. in (E) .Sidewalk I .Ramp Area ......... ----· 2 ,,,, .•• .u.-.,.-.u.,,. ...... .-. ........ ,...,. .• EA $580.00 7 Adjust.Utility Manhole_Covers_to grade ...................... 8 EA • ···-$~_,225.00 -···· ····-···················-···· ....................... , ............ _ 8 Adiust Utilit y (Valve /Cleanout) Covers to grade 4 EA $835.00 9 Adiust Drain Inlet to grade 5 EA $835.00
10 Adjust Centerline Monument Covers to grade (Protect 3 EA $835.00 II Pavement Delineation ("STOP" Legend. and_ Stop .Bar) ........................... 4 EA ....................................... ........... $600 00 12 Pavement Delineation Crosswalk (Detail A24F - Ladder) 6 EA $2 700.00 13 Pavement Delineation (Detail 22) 1400 LF $1.60
14 Pavement Delineation (Detail 39 I 39A) 2,800 LF $1.20 15 Pavement .Delineation (2' wide .Bike.lane_buffer. -.. Detail 39/ ....... -... ,. ··----------· 2,800 EA $~.2~ 16 Pavement Delineation (Bike Lane Symbol w/ Arrow) 12 EA $172.80 17 Pavement Delineation (Bike Lane Share Arrow) 2 EA $172.80 18 Pavement Delineation - Dial!Dnal Parking Lines 54 EA $7560 19 Bike Path Si~ - l Post 4 EA ............ $43200 ··-·-- .......... 20 Rep lace Stop Sign - 1 Post 4 EA $4'.'12.00
21 Replace Street Name Sil?11 - 1 Post 4 EA ,un,; nn
22 Rep lace Street Name SiQfl~ 2 - 1 Post 1 EA $440.00
Amount
($
$31 ,262.00
···-···$7 000.00
-·-·· $.ll,.866 80 ----
$211 898.00
$1 1,488.00
$1J60.00 ...........
""" $9,800.00 .. _ ..........
$3 340.00
$4 175.00
$2,505.00
$2.,.400.00 ..............
$16,2QQ.OQ
$2 240.00
$3,360.00
$9_j00.00 ..... ___
$2 073.60
$345.6Q_
$4 082.40
...... $1,728.00
$1 ??Rnn
$1 "?n.nn
!t.d.40.00
Total Add Alt Bid Schedule= $359,812.40
CITY OF MARYSVILLE
PUBLIC WORKS DEPARTMENT
BIDDER'S BOND
CDBG PAVEMENT REHABILITATION - PHASE 3 PROJECT
CONTRACT NO. 24-10
GREAT AMERICAN INSURNACE
We, LAMON CONSTRUCTION co., INC. , as Principal, and COMPANY , as Surety, are bound unto the City of Marysville, PUBLIC WORKS DEPARTMENT, hereafter referred to as "Obligee," in the penal sum of ten percent (10%) of the total amount of the bid of the Principal submitted to the Obligee for the work described below, for the payment of which swn we bind ourselves jointly and severally.
THE CONDITION OF THIS OBLIGATION IS SUCH, THAT:
WHEREAS, the Principal is submitting a bid to the Obligee for CDBG PAVEMENT REHABILITATION - PHASE 3 PROJECT for which bids are to be opened at Marysville, California, on ---'A...:,:P.:.cril....: 9.:....: , 2=-=- o=-=26:....._ _________ , NOW, THEREFORE, if the Principal is awarded the contract and, within the time and manner required under the Notice to Contractors, Special Provisions, Proposals, and Contract for this work, after the prescribed forms are presented to him for signature, enters into a written contract, in the prescribed form, in accordance with the bid, and files two bonds with the Obligee, one to guarantee faithful performance of the contract and the other to guarantee payment for labor and materials is provided by law, then this obligation shall be null and void; otherwise, it shall remain in full force.
In the event suit is brought upon this bond by the Obligee and judgment is recovered, the Surety shall pay all costs incurred by Obligee in such suit, including a reasonable attorney's fee to be fixed by the court.
Dated: April6 2026· ----------' ,
LAMON CONSTRUCTION CO., INC.
By: b~
GREAT AMERICAN INSURANCE COMPANY
By: .il.--A' ~,.---- -ff' Karen Amin, Attorney-in-Fact
ACKNOWLEDGMENT
A notary public or other o.fficer completing this
certificate. verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity or that document.
State of California
County Of San Joaquin
On __ __:..; A:c;.:pr.::.. il .::_ 6,.:, 20::.::: 2:.;;.. 6.._ ____ ~efore tne, .. Jennifer Lo~ r. Notary Public (insert ni'ime and title of tne officer)
personally appeared Karen Amin .
who proved to me on the basis of satisfactocy evidence fa be the person(~) whose name(~ is~ subscribed to lhewithin instrument and acknowledged to me that~tshe~ executed the.same in K)t!her~authotized capacity~. and that by""'herJC~ signature~) on the instrument the person(~, orthe entity upon behalf ofwhichthe person~} acted, executedtheinstrument.
I certify under PE.NALJY OF PERJURY under the laW$ Clf the Sta\e of California that t~e fore9oing p~tagraph is true ang correct. • • • •
WITNESSmy hand and official seat JENNIFER LOPER
~ Notary Public • California ~
San Joaquin County ~
Commtnton II 2508440
,o ,? My Comm, Expires Jan 27, 2029
(Seal)
GREAT AMERICAN INSURANCE COMPANY
Administrative Office: 301 E 4TH STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740 The number of persons authorized by THREE
this power of attorney is not more than
POWER OF ATTORNEY
No. O 14840
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY, a corporation organized and existing under and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than one is named, its true and lawful attorney-in-fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below.
DANIEL M. CONNOLLY
KAREN AMIN
JENNIFER LOPER
Name Address
ALL OF
LODI, CALIFORNIA
Limit of Power
ALL
$100,000,000
It is agreed that the power and authority hereby given to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 29TH day of APRIL 2025 Attest GREAT AMERICAN INSURANCE COMPANY
vv
Assistant Secretary ivisional Senior Vice President
JOHN K. WEBSTER (Sn-377-2405}
STATE OF OHIO, COUNTY OF HAMILTON - ss:
On this 29TH day of APRIL , 2025 , before me personally appeared JOHN K. WEBSTER, to me known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond Division of Great American Insurance Company, the Company described in and which executed the above instrument; that he knows the seal of the said Company; that the seal affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name thereto by like authority.
SUSAN A KOHORST
Not1ry 9ubllc
State of Ohio
My Comm. Expires
Ma~ 18, 1030
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company by unanimous written consent dated June 9, 2008.
RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents, Divisional Vice Presidents and Divisional Assistant Vice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact to execute on behalf of the Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; to prescribe their respective duties and the respective limits of their authority; and to revoke any such appointment at any time.
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond, undertaking, contract of suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed.
CERTIFICATION
I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of June 9, 2008 have not been revoked and are now in full force and effect. igned and sealed this 6th dayof April
Assistant ::iecretary
S11901 (1 0/24)
THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THlS PROPOSAL
SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART OF THIS PROPOSAL.
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The bidder Lamon Construction Co., Inc. , proposed subcontractor see list hereby certifies that he has X has not _,
participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor [41 CFR 60-1.7(6)(1)], and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of$l0,000 or under are exempt.) Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.
Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-l .7(b)(l) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S.
Department of Labor.
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Yes --- No X
If the answer is yes, explain the circumstances in the following space:
PUBLIC CONTRACT CODE SECTION 10232 STATEMENT
In accordance with Public Contract Code Section 10232, the Contractor hereby states, under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two (2) year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
In accordance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares, under penalty of perjury under the laws of the State of California, that the bidder has_ has not __x_ been convicted within the preceding three (3) years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any State or Federal Antitrust Law in connection with the bidding upon, award of or performance of any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.
Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided.
NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER
AND SUBMITTED WITH BID
Ken Norton , being first duly sworn, deposes and says that he/she is CEO of Lamon Construction Co. , Inc. , the party making the foregoing bid, that the bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract or anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his/her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
CERTIFICATION
(LABOR CODE SECTION 1861)
ST A TE OF CALIFORNIA )
) ss
COUNTY OF YUBA)
I, the undersigned, do hereby certify:
That I am aware of the provisions of Section 3700 of the Labor Code of the State of California, which requires every employer to be insured against liability for Workers' Compensation or to undertake self insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Executed at __ 8_7_1_V_o_n_G_e_l_d_e_rn_W_ a~y~, _Y_u_b_a_C_it~y_C_A_ 9_5_9_9_1 _ On _________ 4_/_9/_2_6 ________ _
(Date)
I CERTIFY under the penalty of perjury that the foregoing is true and correct.
Signature
~L'ofContractor-Employer ~~
DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, and manager:
• ls not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency;
• Has not been suspended, debarred, voluntarily excluded or determined ineligible by any federal agency within the past 3 years;
• Does not have a proposed debarment pending; and
• Has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
Note: Providing false infonnation may result in criminal prosecution or administrative sanctions.
The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
NONLOBBYING CERTIFICATION
FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(I) No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. (2) If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub-recipients shall certify and disclose accordingly.
DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type: D a. contract D a. bid/offer/application D a. initial b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan
e. loan guarantee
f. loan insurance
4. Name and Address of Reporting Entity
D Prime D Subawardee
Tier ___ , ifknown
6. Congressional District, if known
Federal Department/Agency:
8. Federal Action Number, if known:
10. a. Name and Address of Lobby Entity
(If individual, last name, first name, MI)
For Material Change Only:
year__ quarter ___ _
date oflast report ____ _
5. If Reporting Entity in No. 4 is Subawardee,
Enter Name and Address of Prime:
Congressional District, if known
7. Federal Program Name/Description:
CFDA Number, if applicable _______ _
9. Award Amount, if known:
b. Individuals Per-forming Services (including address if different from No. 1 0a)
(last name, first name, Ml)
(attach Continuation Sheet(s) if necessary)
11. Amount of Payment (check all that apply)
$ ______ D actual D Planned
12. Form of Payment (check all that apply):
D a. cash D b. in-kind; specify: nature _____ _
value _____ _
13. Type of Payment (check all that apply)
a. retainer
b. one-time fee
c. commission
d. contingent fee
e deferred
f. other, specify _________ __ _
14. Brief Description of Services Performed or to be performed and Date(s) of Service, including officers(s), employee(s), or member(s) contacted, for Payment Jndicated in Item ll:
15. Continuation Sheet(s) attached:
(attach Continuation Sheet(s) if necessary)
Yes D No D
16. lnfonnation requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered mto. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress
semiannually and will be available for public inspection Any person who fails to file the required disclosure shall be subject to a civil penalty ofnot less than $10,000 and not more than $100,000 for each such failure.
Federal Use Only:
Signature: _________________ _
Print Name: ________________ _
Title: __________________ _
Telephone No.: _________ Date: _ _ __ _
Authorized for Local Reproduction
Standard Form - LLL
INSTRUCTIONS FOR COMPLETION OF SF-LLL,
DISCLOSURE OF LOBBYING ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether subawardee or prime federal recipient, at the initiation or receipt of covered federal action or a material change to previous filing pursuant to title 31 U.S.C. Section 1352. The filing of a form is required for such payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress or an employee of a Member of Congress in connection with a covered federal action.
Attach a continuation sheet for additional information if the space on the form is inadequate.
Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.
1. Identify the type of covered federal action for which lobbying activity is and/or has been secured to influence, the outcome of a covered federal action.
2. Identify the status of the covered federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by this reporting entity for this covered federal action.
4. Enter the full name, address, city, state, and zip code of the reporting entity. Include Congressional District if known. Check the appropriate classification of the reporting entity that designates if it is or expects to be a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in Item 4 checks "Subawardee," then enter the full name, address, city, State and zip code of the prime federal recipient. Include Congressional District, if known.
6. Enter the name of the federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the federal program name or description for the covered federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans and loan commitments.
8. Enter the most appropriate federal identifying number available for the federal action identification in item I (e.g., Request for Proposal (RFP) number, Invitation for Bid (IFB) number, grant announcement number, the contract grant. or loan award number, the application/proposal control number assigned by the federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered federal action where there has been an award or loan commitment by the Federal agency, enter the federal amount of the award/loan commitments for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, state, and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influenced the covered federal action. (b) Enter the full names of the individual(s) performing services and include full address if different from l O (a). Enter last name, first name and middle initial (Ml).
11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.
12. Check the appropriate box(es). Check all boxes that apply. lf payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.
13. Check the appropriate box(es). Check all boxes that apply. Jf other, specify nature.
14. Provide a specific and detailed description of the services that the lobbyist has perfonned or will be expected to perform and the date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with federal officials.
Identify the federal officer(s) or employee(s) contacted or the officer(s) employee(s) or Member(s) of Congress that were contacted.
15. Check whether or not a continuation sheet(s) is attached.
16. The certifying official shall sign and date the form, and print his/her name title and telephone number.
Public reporting burden for this collection of information is estimated to average 30 minutes per response, including time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of infonnation. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.
Following is the name and location of the mill, shop, or office of each subcontractor who will perform work or labor or render services to the above-signed bidder. Failure of the bidder to specify a subcontractor for any portion of the work to be performed under the contract constitutes an agreement by the bidder to perform that portion of the work himself.
LABOR OR SERVICES
NAME AND ADDRESS TO BE PERFORMED SUBCONTRACTOR
OF SUBCONTRACTOR AND VALUE THEREOF LICENSE# CLASS
(I) St. Francis Electric Traffic Loop Install 1003811 A 975 Carden St. $ i14,000.00
San Leandro, CA 94577
(2) Darren Taylor Construction Inc. StriQing & Markings 903262 A 19672 N. Hirsch Ct. $ i333,525.00
Anderson, CA 96007
(3) Pacific Northwest Oil Paving Fabric/Tack Coat (Partial) 705296 A 8556 Wey__and Ave $ i164,806.00
Sacramento, CA 95828
(4) Union Pavement Services Inc. TyQe II Slurry Seal 1131864 A PO Box 292 $ $49,220.00
Modesto, CA 95353
(5) Pavement Recy__cling Sy__stems Inc. Asphalt Grinding (Partial) 569352 A 10240 San Sevaine Way__ $ $51 ,000.00
JuruQa Valley__, CA 91752
(6) T&S Inc Traffic Control (Partial) & Signs 983087 A, C-31 18981 Gravel Plant Rd. $ $50,250.00
Redding, CA 96002
(7)
(8) ------------
$
IF ADDITIONAL SPACE IS REQUIRED, PLEASE CONTINUE ON BACK OF THIS PAGE.
THIS LIST MUST BE SUBMITTED WITH BID PROPOSAL.
PROPOSAL CERTIFICATION
Accompanying this proposal is a certified or cashier's check, or bidder's bond, in the amount of ten percent (10%) of the total bid price, executed by an admitted surety insurer made payable to the City of Marysville for an amount equal to at least ten percent ( I 0%) of the bid amount.
State if bidder is an individual, corporation, or partnership. If bidder is a corporation, state legal name of the corporation, state of incorporation, and the name of the president, secretary, and treasurer. lfthe bidder is a partnership, list the names of all the partners.
Lamon Construction Co., Inc.
Ken Norton - CEO / Manager, Lisa Norton - CFO / Treasurer I Secretary By my signature on this proposal, I certify, under penalty of perjury under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Sections 10162, I 0232, and 10285.1 are true and correct and that the bidder has complied with the requirements of Section 8103 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2, of the California Administrative Code). By my signature on this proposal, I further certify, under penalty of perjury under the laws of the State of California and the United States of America, that the Non-collusion Affidavit required by Title 23 United States Code, Section 112, and Public Contract Code Section 7106, and the Title 49 Code of Federal Regulations, Part 29, Debarment and Suspension Certification, are true and correct.
Date: 4/9/26
Signature: - ~ -1----"~ "~ ~...J------------
Name of Bidder: Ken Norton
Title: _________ C--=Ec...::O _______ _
Corporate Seal
THE CITY OF MARYSVILLE
MARYSVILLE, CA
ADDENDUM NO. 1
CITY OF MARYSVILLE
PHASE 3 CDBG PAVEMENT REHABILITATION PROJECT
CONTRACT NO. 24-10
The purpose of this Addendum No. 1 is to notify Bidders of clarifications to the Project Plans for the above project. This Addendum shall be attached to and become a part of said Contract Documents. THIS ADDENDUM SHALL BE SIGNED BY THE BIDDER. DATED AND SUBMITTED WITH THE PROPOSAL FOR THE PROJECT.
Bidder Questions I Clarifications:
1. Question: In the Notice to contractors, it states that sealed proposals are due Thursday, March 27, 2026. Thursday of that week is the 26th. Are the bids due on the 26th or the 27th? Response: The bid date has been revised to Thursday, April 9, 2026, the time is revised to until 1 :30 P.M. at City Clerk's Office, City of Marysville, located at City Hall, 526 C Street, Marysville, California, 95901.
2. Question: There seems to be a discrepancy in the specifications regarding the time completion for the project. Page 9 states 90 working days, while page 31 states 120 working days. Which one is correct?
Response: The project has 90 working days.
3. Question: The typical cross-sections for each street (plan sheets 3- 11) show a 2' curb, however the attached city details on plan sheet 14 do not show a 2' curb. Please confirm which City Detail is being used for the Curb and Gutter for each street.
Response: The existing curbs on the streets vary from the City standard 2.5' wide with a 2' pan to a 1.5' wide with a 1' pan. Where the damaged curb is being replaced, the curb dimensions will match the existing. Where new curb is being installed for accessible ramps and minor street entrances, the curb will match the city detail with a transition to existing curb as shown in the details.
4. Question: The typical cross-sections for each street (plan sheets 3- 11) indicate a full-depth grind, yet a taper grind at the edges is noted on the same typical. Based on the SF estimated for Bid Item #1 on Bid Schedules A 1 -A8 and Alt. Bid Schedule A9, it appears a full-depth grind is intended. Please clarify whether a fulf-grind or a taper/wedge grind is required.
Response: The grind is a taper grind at the edges of the pavement section but also includes a profile grind to remove and ridges and that is why the entire section area included even though that entire area will not be ground to the minimum depth.
CITY OF MARYSVILLE
PHASE 1 CDBG PAVEMENT REHABILITATION PROJECT
CONTRACT NO. 24-10
March 20, 2026
Addendum No. 1
5. Question: The specifications reference Appendix A bid requirement forms throughout the bid documents, however Appendix A is not attached. Please provide Appendix A via an addendum.
Response: Appendix A is not specifically labeled, but it is the section labeled "Disadvantaged Business and Section 3 BID Requirements" that are pages 83 through 99 in the specification PDF document. The required forms are included in this section.
6. Question: Are there any goals for this project? If so, what are the percentages for these goals? Response: The goals are listed on page 3 of the" Disadvantaged Business and Section 3 BID Requirements". The goal is 14.3% MBE and 6.9% WBE.
7. Question: Please provide the Existing Pavement sections for G Street on Plan Sheet 5, specifically where we are installing the Concrete Roundabout.
Response: 1. The city traffic committee has opted to not install the traffic circle, please see the revised plan sheets and bid schedule removing this item of work.
8. Question: In the specs on page 1, it says, "Copies of proposal forms obtained from a source other than the city will not be allowed. " Do we need to go and pick up a proposal from the City? Response: The proposal forms are in the specification package PDF and those are to be used for bidding, no sperate package is needed. The proposal bid schedule has been revised by this addendum and the revised bid schedule is attached.
9. Question: Is the D Street paving alternate bid schedule planned to be part of the project and what about the paving on 11th, 1 ih, and 13th Street east of D Street if alternative work on Dis not performed?
Response: The D Street work is intended to be completed with this project budget allows it but was broken out separately because it may be eliminated based on the bid pricing. 11th, 12th, and 13th Street east of D Street would not be completed if D Street is not included in the contract, and these segments have been moved to the Alternate bid schedule, adjusting the quantities.
10. Question: The bid schedule has a quantity of 6,500 SF of pavement repair, but the areas are not identified?
Response: The areas will be identified at the time of the grinding of the streets.
11. Question: In the proposal forms, there are 2 "Bid Schedules A 1-A8 Combined" in a row with the same quantities. Is there a reason for that?
Response: No that is an error, please see attached revised proposal forms.
CITY OF MARYSVILLE
PHASE 1 CDBG PAVEMENT REHABILITATION PROJECT
CONTRACT NO. 24-10
March 20, 2026
Addendum No. 1
12. Question: Items 13 - Install HMA Speed Table After Overlay with Paving Markings and Warning Signs and Item 14 - Install Concrete Mini Roundabout with Signs. Are the pavement markings and signs paid for in these items?
Response: Yes, the pavement markings and advance warning signs for the speed tables are included in this item.
Attachments: Revised bid schedule, Revise Plan Sheets A03, A05, A06, & AO? BIDDER:
Lamon Construction Co., Inc.
NAME
871 Von Geldern Way, Yuba City CA 95991
ADDRESS
PREPARED BY:
CITY F ~~ MARYSVILLE
DATED: March 20, 2026
Bid opening date revised to ThursdaY, April 9,
2026 and time changed to 1:30 p.m.
Ken Norton, CEO ~ 2::> s:=
SIGNATURE
___ by this Addendum No. 1
DATE: __ ---.:..: 4/-=-9'--"/2=-=6 ___ _
CITY OF MARYSVILLE
PHASE 1 CDBG PAVEMENT REHABILITATION PROJECT
CONTRACT NO. 24-10
March 20, 2026
Addendum No. 1
THE CITY OF MARYSVILLE
MARYSVILLE, CA
ADDENDUM NO. 2
CITY OF MARYSVILLE
PHASE 3 CDBG PAVEMENT REHABILITATION PROJECT
CONTRACT NO. 24-10
The purpose of this Addendum No. 2 is to notify Bidders of clarifications to the Project Plans for the above project. This Addendum shall be attached to and become a part of said Contract Documents. THIS
ADDENDUM SHALL BE SIGNED BY THE BIDDER, DATED AND SUBMITTED WITH THE PROPOSAL FOR THE PROJECT.
Bidder Questions / Clarifications:
1. Question: What is the Bid Item 6 Slurry seal type 2 specification I am not seeing a section for this?
Response: Type II Slurry Seal would be in conformance with Section 37-03 of the standard specifications. See attached add specification section for the slurry seal.
2. Question: What are the Hours of work and Street Closures hours? Response: The closures could be between 7 am and 6 pm. See the added specification section for how it relates to the seal coating.
3. Question: What are the dimensions on the detail A24F Ladder crosswalks? Response: The dimensions are a 1' wide rail with 2' wide bars and a 3' wide opening.
Attachments: Slurry Seal Specification section
BIDDER:
Lamon Construction Co., Inc.
NAME
871 Von Geldern Way, Yuba City CA 95991
ADDRESS
Ken Norton, CEO ~ SIGNATURE 0
DATE: ___ .,,;.;. 4/..,;;,. 9;,_;;; /2:....::. 6 __ _
CITY OF MARYSVILLE
PHASE 3 CDBG PAVEMENT REHABILITATION PROJECT
CONTRACT NO. 24-10
PREPARED BY:
ITY OF ~ MARYSVILLE
DATED: April 6, 2026
Bid opening date remains Thursday, April 9,
2026 and time changed to 1:30 p.m.
as by Addendum No. 1
April 6, 2026
Addendum No. 2